Anda di halaman 1dari 8

GAMBAR RENCANA

PEMBUATAN SUMUR DALAM


TANGGA BESI BULAT Ø 2" TANGGA BESI BULAT Ø 2"
TANGGA BESI BULAT Ø 1" TANGGA BESI BULAT Ø 1"
PLAT BODRES
4,5 mm x 1,4 M x 1,4 M

30
BAJA L 50. 50 .5

40
BAJA L 50. 50 .5

47
Tangki Air Fiber

140
45
100
80
1000 liter ( Sesuai Rat )

1 1 1 1

47
140

80
47 45 47
100
140

DENAH TORN AIR Elv. + 4.01 DENAH TORN AIR Elv. +4.065
SKALA 1 : 20 SKALA 1 : 20

TANGGA BESI BULAT Ø 2" TANGGA BESI BULAT Ø 2"


TANGGA BESI BULAT Ø 1"

LANTAI RABAT BETON K175


40

40
BAJA L 50. 50 .5 BAJA L 50. 50 .5

- 0.20
100

120

100
95
1 1 1 1

100 Pipa PVC 1/2" Kran Air 1/2"


120 100

DENAH TORN AIR Elv. + 1.00


DENAH TORN AIR Elv. ± 0.00 SKALA 1 : 20
SKALA 1 : 20
TAMPAK DEPAN TAMPAK SAMPING
SKALA 1 : 40 SKALA 1 : 40
BAJA L 50. 50 .5

ANGKUR Ø13
BASE PLAT 16x16cm, t=16mm
4
140 DI LAS KOLOM PEDESTAL 20 x 20
Pipa Knee
Tangki Air Fiber
Pipa 1 1/4" Distribusi 1000 liter ( Sesuai Rat )
SLOOF 20 x 30
Ke Toren
+ 5.04

20
BAJA L 50. 50 .5 -0.20

70
PLAT BODRES 4,5 mm x 1,4 M x 1,4 M
+ 4.065 DETAIL 1
-0.30 SKALA 1 : 10
80 + 4.036
3
100

BESI BULAT Ø 1"


100

BESI BULAT Ø 2"


2 BAJA L 50. 50 .5
400

BAJA L 50. 50 .5
100

+ 1.036 DI LAS

Pipa 1 1/4" Distribusi


Ke Toren KRAN AIR 1/2" DETAIL 2
SKALA 1 : 10
100

100 1
SLOOF 20/30 ± 0.00

-0.30
30

-0.20
-0.30
140
90

- 1.20 PLAT BODRES


20

4,5 mm x 1,4 M x 1,4 M


DI LAS
80 80

100

BAJA L 50. 50 .5
POTONGAN - 1
SKALA 1 : 40
DETAIL 3
SKALA 1 : 10
100
4
BAJA L 50. 50 .5

400

DI LAS

TANGKI AIR FIBER


1000 LITER ( SESUAI RAT )
BESI BULAT Ø 1"
100

BESI BULAT Ø 2"

BAJA L 50. 50 .5
BAJA L 50. 50 .5

DI LAS + 1.036

70
PLAT BODRES
KRAN AIR 1/2" 4,5 mm x 1,4 M x 1,4 M + 4.065

DI LAS
100

BAJA L 50. 50 .5 BESI BULAT Ø 1"

100
BESI BULAT Ø 2"
DI LAS
± 0.00
KOLOM PEDESTAL 20x20 BAJA L 50. 50 .5
20

BASE PLAT 16x16cm, t=16mm


-0.20 SLOOF 20/30
-0.30
-0.30
DI LAS
URUGAN TANAH
100

Ø10-150

100
6 Ø 16-150
20

- 1.20
10 5

LANTAI KERJA
- 1.20
PASIR URUG

20
80
90

DETAIL PRINSIP
SKALA 1 : 20
20

2 Ø 12
20

2 Ø 12

20
30
Ø 8- 150
2 Ø 12
BAJA L 50. 50 .5
BASE PLAT 16x16cm, t=16mm
BASE PLAT KOLOM PEDESTAL 20x20

DETAIL SLOOF ±0.00


SKALA 1 : 10 SLOOF 20/30
-0.20

10
60
-0.10
20
URUGAN TANAH

2 Ø 12

Ø 8- 150
Ø10-150
20

2 Ø 12

90
6 Ø 16-150

-1.20
DETAIL KOLOM PEDESTAL (KP)

20
SKALA 1 : 10 -1.40
-1.45

10 5
LANTAI KERJA
PASIR URUG -1.55

80 20
80
90

20 PT
PT
20
80

KP SLOOF 20/30 KP

6 D 16-150

6 D 16-150
SLOOF 20/30

SLOOF 20/30

100
80

20
80

6 D 16-150
6 D 16-150
20

KP SLOOF 20/30 KP 80

80
PT PT
100
DETAIL PONDASI TELAPAK (PT)
SKALA 1 : 20

DENAH PONDASI & SLOOF


SKALA 1 : 20
60 60

80

80
TAMPAK DEPAN TAMPAK SAMPING
SKALA 1 : 20 SKALA 1 : 20

60
DOP / PENUTUP PIPA 5"

1 Ø 5" PIPA CASSING


60

Ø 1 1/4" PIPA ISAP

PERMUKAAN TANAH DUDUKAN TEMPAT


MENGIKAT POMPA

DENAH RUMAH POMPA


SKALA 1 : 20
TUTUP BESI HENDLE 30.30.3 BESI SIKU
60

PEK. BATA MERAH


Rumah Pompa RUMAH POMPA

80
PIPA SONDING Ø1 1/4"

DUDUKAN TEMPAT Ø 1 1/4" PIPA ISAP


MENGIKAT POMPA
MUKA TANAH

POMPA SUBMERSIBLE 3"


GROUNTING = GOR PENUTUP

3000
DINDING LUBANG BOR
Ø 5" PIPA CASSING

Ø 1 1/4" PIPA ISAP

Ø 5" PIPA CASSING


TANAH LIAT

POMPA DIIKAT DENGAN


TAMBANG PLASTIK
VARIABLE
VARIABLE

POMPA SUBMERSIBLE 3"

TANAH LIAT
DETAIL POMPA
SKALA 1 : 10
1200

GRAVEL PACK/ BATU KRIKIL

REAMING Ø 8 34"

POTONGAN - 1
SKALA 1 : 20

Anda mungkin juga menyukai