25
+3.00
+3.18 +3.18 +3.18
BALOK 15x25
SLOOF 20x30
10
±0.00 -0.05 -0.05 -0.05 ±0.00 ±0.00
POTONGAN - A
SKALA 1 : 50
+3.25 +3.25
+3.00
+3.18
BALOK 15x25
KOLOM 20X20
150
SLOOF 20x30
68
±0.00
70
68 150 150 150 68
450
TAMPAK SAMPING 150 68
30
SKALA 1 : 50
-1.08
60
DENAH MCK
SKALA 1 : 50
POTONGAN - B
SKALA 1 : 50
20
6 D 13 20
KOLOM 20x20 Ø 8-200
4Ø12
SLOOF 15x25 Ø8-150
-0.05 -0.05
30
20
URUGAN TANAH
70
1
PAS. 2 BATA MERAH 1:5
30
5
LANTAI KERJA
10
PASIR URUG
15 60 15
110
D 13-100
15
D 13-100
20
60
4Ø12
Ø8-150
25
20
60
SKALA 1 : 20
PIPA INLET PIPA VENT PVC Ø 2"
DARI TOILET PVC Ø 4"
TANAH URUG
TANAH URUG TANAH URUG
VARIABLE
VARIABLE
PIPA OVER FLOW PIPA PVC Ø 4" S. 1,5 % PIPA PVC Ø 4" S. 1,5 %
( DILUBANGI )
PVC Ø 4" ( DILUBANGI )
140
180
180
180
PIPA PVC Ø 4" S. 1,5 %
IJUK
15
PIPA OVER FLOW IJUK
PAS. BATA PVC Ø 4"
10 ( BAGIAN DALAM SEPTIKTANK
DI PLESTTER & DI ACI ) PECAHAN BATA DAN KERIKIL
PECAHAN BATA DAN KERIKIL
ROLLAG BATA SPESI
40
40
40
SPESI PASIR URUGAN PASIR PADAT ROLLAG BATA
40
URUGAN PASIR PADAT
40 100
100
87 10 55
24 152 24
200 88 120
408
C
B
PIPA PVC Ø 4" S. 1,5 %
PIPA INLET ( DILUBANGI )
DARI TOILET PVC Ø 4" PIPA OVER FLOW PVC 4"
A
PIPA PVC Ø 4" S. 1,5 %
100
100
408
SEPTICTANK
SKALA 1 : 40