PPH 2% 2,457,814
JUMLAH TOTAL DANA DESA 108,143,816
Dari Dana
122,890,700
Desa
SUMBER Dari
-
DANA Swadaya
TOTAL 122,890,700
SUMBER
DANA
TOTAL 122,890,700
RENCANA ANGGARAN BIAYA
URAIAN Total Swadaya APBD Prov Satuan (Rp) Swadaya APBD Prov Total
I. Bahan -
1 Semen 50 kg 1656 0 1656 sak 60,300 99,856,800 99,856,800
2 Pasir Cor / Beton 188 0 188 m3 223,400 41,999,200 41,999,200
3 Batu pecah/split 2-3 168 0 168 m3 223,400 37,531,200 37,531,200
4 Kayu Begisting klas III 2 0 2 m3 1,675,100 3,350,200 3,350,200
6 Paku ragam 2 0 2 kg 16,800 33,600 33,600
- -
Sub Total 1) 182,771,000 182,771,000
-
II. Alat -
1 Papan Proyek 1 0 1 unit 111,700 111,700 111,700
2 Prasasti 1 0 1 unit 292,900 292,900 292,900
3 Mobilisasi Molen 1 0 1 ls 335,000 335,000 335,000
4 Sewa Molen 30 0 30 hari 390,900 11,727,000 11,727,000
6 Ember Cor 50 0 50 buah 11,200 560,000 560,000
8 Benang 4 4 buah 5,600 22,400 22,400
Sub Total 2) 13,049,000 13,049,000
-
-
III. Upah -
1 Pekerja 301 0 301 HOK 60,000 18,060,000 18,060,000
2 Tukang 89 0 89 HOK 80,000 7,120,000 7,120,000
-
Sub Total 4) 25,180,000 25,180,000
-
Jumlah Total - 221,000,000 221,000,000
JUMLAH TOTAL DANA DESA 221,000,000
Dari -
Swadaya
SUMBER
DANA TOTAL 221,000,000