Anda di halaman 1dari 153

275,000,000.

00

Dua Ratus Tujuh Puluh Lima Juta Rupiah.-

Se Satu
Dua Dua
Tiga Tiga
Empat Empat
Lima Lima
Enam Enam Juta
Tujuh Tujuh
Delapan Delapan
Sembilan Sembilan

275,000,000 0
275,000,000 0
275,000,000 0
275,000,000 0
275,000,000 0
275,000,000 0
275,000,000 0
275,000,000 0
275,000,000 0
275,000,000 2 Dua Ratus
75,000,000 7 Tujuh Puluh Lima Juta
5,000,000 5 Lima
0 0
0 0
0 0
0 0
0 0
0 0
Dua Ratus
Tujuh Puluh Lima Juta
DAFTAR HARGA SATUAN UPAH DAN BAHAN

HARGA SATUAN
NO URAIAN SATUAN
( Rp )
1 2 3 4
I UPAH TENAGA KERJA
1 Pekerja OH 45,000.00
2 Mandor OH 65,000.00
3 Tukang Batu OH 65,000.00
4 Tukang Kayu OH 65,000.00
5 Tukang Besi OH 65,000.00
6 Tukang Cat OH 65,000.00
7 Kepala Tukang OH 65,000.00
8 Tukang OH 45,000.00
II BAHAN
A. Bahan Batu, Semen, Tanah dan Pasir
1 Batu Belah/Gunung M2 100,000.00
2 Batu Bata Bh 500.00
3 Batu Pecah 5/7 M3 100,000.00
4 Batu Pecah 3/5 M3 250,000.00
5 Batu Pecah 1/3 M3 150,000.00
6 Batu Kali M3 100,000.00
7 Split M3 250,000.00
8 Kerikil M3 115,000.00
9 Kerikil Halus M3 75,000.00
10 Pasir Pasangan M3 85,000.00
11 Pasir Urug M3 85,000.00
12 Semen Tonasa @ 50 Kg Kg 1,400.00
13 Semen Tiga Roda @ 50 Kg Kg 1,300.00
14 Semen Bosowa @ 50 Kg Kg 1,300.00
15 Semen Warna Kg 38,000.00
16 Domato Timbunan Pilihan M3 10,000.00
17 Tanah Urug M3 20,000.00
18 Buis Beton m 350,000.00

B. Bahan Kayu
1 Kayu Lingua Balok Klas I M3 3,300,000.00
2 Kayu Lingua Papan Klas I M3 3,300,000.00
3 Kayu Papan Klas II M3 2,600,000.00
4 Kayu Balok Klas II M3 2,600,000.00
5 Kayu Balok Kls III M3 1,750,000.00
6 Kayu Papan Kls III M3 1,750,000.00
7 Kayu Lis Profil 3 cm Btg 10,500.00
8 Kayu Lis Profil 4 cm Btg 12,000.00
9 Lumbersering (7 mm) Lembar 19,500.00
10 Triplek Tebal 3 mm Lembar 45,000.00
11 Triplek Tebal 4 mm Lembar 65,000.00

C. Bahan Logam
1 Angker Kozen Kg 10,000.00
2 Baut Pengunci Kuda-kuda dia. 12 mm Bh 8,500.00
3 Beugel Pengikat Kuda-kuda dia. 12 mm Bh 25,000.00
4 Besi Beton Dia 6" Ujung 15,000.00
5 Besi Beton Dia 8" Ujung 41,000.00
6 Besi Beton Dia 10" Ujung 63,000.00
7 Besi Beton Dia 12" Ujung 91,000.00
8 Besi Beton Dia 16" Ujung 135,000.00
9 Besi Beton Polos Kg 9,000.00
10 Kawat Beton Kg 20,000.00
1 2 3 4
11 Kawat Bronjong Kg 25,000.00
12 Kawat Las Kg 33,500.00
13 Kawat Harmonika Kg 30,000.00
14 Kawat Ram M2 2,400.00
15 Paku Biasa 2 - 6 " Kg 14,000.00
1 2 3 4
16 Paku Seng Kg 28,000.00
17 Paku Atap Genteng Metal Kg 25,000.00
18 Paku Triplek Kg 23,000.00
19 Seng Gelombang BJLS 20 Kl Lbr 50,000.00
20 Seng Gelombang BJLS 30 Kl Lbr 50,000.00
21 Seng Plat BJLS 20 Kl Lbr 51,000.00
22 Seng Plat BJLS 30 Kl Lbr 55,000.00
23 Genteng Metal (Sakura Roof) Lbr 40,000.00
24 Nok Genteng Metal (Sakura Roof) Lbr 35,000.00
25 Bumbungan Lbr 25,000.00
26 Besi Penyangga M' 100,000.00

D. Perlengkapan Pintu dan Jendela


1 Engsel Kupu-kupu Kecil Bh 10,000.00
2 Engsel Kupu-kupu Besar Bh 15,000.00
3 Engsel Kuningan Bh 25,000.00
4 Grendel Jendela Bh 15,000.00
5 Hak Angin Biasa Bh 3,500.00
6 Kaca Bening Tbl 3 mm M2 100,000.00
7 Kaca Bening Tbl 4,5 mm M2 120,000.00
8 Kunci Tanam 2 Slaag ( Yale ) Bh 55,000.00
9 Daun Pintu PVC / Toilet Set 780,000.00
10 Batu Karawang 12 x 24 cm Bh 5,000.00
11 Glass Block Bh 40,000.00

E. Bahan Lantai
1 Keramik Lantai 30 x 30 cm bh 6,000.00
2 Keramik Lantai 20 x 20 cm bh 2,680.00
3 Keramik Dinding 20 x 25 cm Dos 65,000.00
4 Plint Warna 30 x 30 cm Dos 60,000.00

F. Bahan Cat
1 Amplas Lbr 5,000.00
2 Cat Dasar Kg 5,000.00
3 Cat Tembok ( Metrolite ) Kg 16,000.00
4 Dempul Kayu Kg 20,000.00
5 Meni Kayu Kg 20,000.00
6 Plamer / Dempul Tembok ( Setara Wallputty ) Kg 7,600.00
7 Residu (5 L) Kaleng 36,000.00

G. Bahan Instalasi Listrik


1 Biaya Penyambungan ( BP ) Watt 900 Ls 450,000.00
2 Biaya Penyambungan ( BP ) Watt 1300 Ls 950,000.00
3 Biaya Penyambungan ( BP ) Watt 2200 Ls 1,700,000.00
4 Instalasi Listrik ( Titik lampu ) Ttk 135,000.00
5 Stop Kontak bh 10,000.00
6 Lampu Pijar 15 Watt bh 35,000.00
7 Lampu TL 20 Watt bh 27,000.00
8 Saklar Tunggal bh 10,000.00
9 Saklar Ganda bh 15,000.00
11 Rumah Saklar bh 2,500.00
12 MCB bh 60,000.00
13 Pipa Lampu bh 10,000.00

H. Perlengkapan Sanitair
1 1 M' Pipa GIP Diameter 1/2 " Ujung 94,000.00
2 1 M' Pipa GIP Diameter 3/4 " Ujung 105,000.00
3 1 M' Pipa GIP Diameter 1 " Ujung 150,000.00
4 1 M' Pipa GIP Diameter 1 1/4 " Ujung 170,000.00
5 1 M' Pipa GIP Diameter 1 1/2" Ujung 190,000.00
6 1 M' Pipa GIP Diameter 2 " Ujung 260,000.00
1 2 3 4
7 1 M' Pipa PVC Diameter 1/2 " Ujung 20,000.00
8 1 M' Pipa PVC Diameter 3/4 " Ujung 35,000.00
9 1 M' Pipa PVC Diameter 1" Ujung 40,000.00
10 1 M' Pipa PVC Diameter 1,5 " Ujung 60,000.00
11 1 M' Pipa PVC Diameter 2" Ujung 45,000.00
12 1 M' Pipa PVC Diameter 3" Ujung 84,000.00
13 1 M' Pipa PVC Diameter 4" Ujung 60,000.00
1 2 3 4
14 Pipa PVC SNI Diameter 3 " M' 114,000.00
15 Pipa PVC SNI Diameter 2 " M' 115,000.00
16 Pipa PVC SNI Diameter 1,5 " M' 110,000.00
17 Pipa PVC SNI Diameter 1 " M' 270,000.00
18 Pipa PVC SNI Diameter 3/4 " M' 654,000.00
18 Asesoris Ukuran 1/2" Bh 5,000.00
19 Asesoris Ukuran 3/4" Bh 6,000.00
20 Asesoris Ukuran 1" Bh 7,500.00
21 Asesoris Ukuran 1 1/4" Bh 10,000.00
22 Asesoris Ukuran 1 1/2" Bh 10,000.00
23 Asesoris Ukuran 2" Bh 13,500.00
24 Asesoris Ukuran 2 1/2" Bh 15,000.00
25 Asesoris Ukuran 3" Bh 15,000.00
26 Asesoris Ukuran 4" Bh 26,000.00
27 Bak Cuci Piring Stainless Steel Bh 350,000.00
28 Floor Drain Stainless Steel Bh 40,000.00
29 Floor Drain Stainless Steel Bh 35,000.00
30 Ijuk Saringan Kg 15,000.00
31 Kloset Duduk Set 1,500,000.00
32 Kloset Jongkok ( KIA ) Bh 170,000.00
33 Kloset Jongkok ( Toto ) Bh 180,000.00
34 Kloset Jongkok ( INA ) Bh 170,000.00
35 Kran Air Bh 25,000.00
36 Stop Kran 1/2 Bh 60,000.00
37 Stop Kran 3/4 Bh 60,000.00
38 Selang Air M' 15,000.00
39 Seal Tape Bh 4,000.00
40 Pipa Penguras / Bocoran Bak Stainless Steel Bh 75,000.00
41 Wastafel ( KIA ) Bh 390,000.00
42 Pompa Air Jet Pump 300 watt Unit 3,700,000.00
43 Mesin Genset 950 Watt Unit 1,800,000.00

I. ALAT
1 Cangkul Bh 50,000.00
2 Sekop Bh 50,000.00
3 Linggis Bh 35,000.00
4 Ember Bh 15,000.00
5 Tali Bh 4,000.00
6 Timba Bh 7,000.00
7 Kuas Bh 15,000.00
8 Katrol Bh 37,500.00
AR HARGA SATUAN UPAH DAN BAHAN

KET.

70,000.00
65,000.00
5
5
5
5
REKAPITULASI RENCANA ANGGARAN BIAYA

BIAYA (Rp)
NO URAIAN KONTRIBUSI MASYARAKAT
TOTAL APBN APBD
IN CASH IN KIND
1 2 3=4+5+6+7 4 5 6 7
I SARANA AIR MINUM (SAM)
1. Pek. Jaringan Pipa 2.700 M ( Dusun 2 dan 3)
a). Bahan Rp 52,664,943 Rp 2,727,900 Rp 4,182,281 Rp 45,754,762 Rp -
b). Alat Rp 500,000 Rp - Rp 500,000 Rp -
c). Upah Rp 18,291,810 Rp 525,350 Rp 10,243,639 Rp 7,522,821 Rp -
Sub Total 1 Rp 71,456,753 Rp 3,253,250 Rp 14,925,919 Rp 53,277,584 Rp -
Rp 71,456,750
2. Pek. Sumur Bor Dalam
a). Bahan Rp 16,827,000 Rp 16,827,000 Rp -
c). Upah Rp 10,000,000 Rp - Rp 10,000,000 Rp -
Sub Total 2 Rp 26,827,000 Rp - Rp - Rp 26,827,000 Rp -
Rp 26,827,000
3. Pek Menara (1 Unit)
a). Bahan Rp 19,494,172 Rp 3,217,000 Rp 402,653 Rp 15,874,519 Rp -
b). Alat Rp 150,000 Rp 150,000 Rp - Rp - Rp -
c). Upah Rp 5,527,752 Rp 351,077 Rp - Rp 5,176,676 Rp -
Sub Total 3 Rp 25,171,924 Rp 3,718,077 Rp 402,653 Rp 21,051,195 Rp -
Rp 25,171,900
4. Pek Rumah Pompa ( 1 Unit)
a). Bahan Rp 135,303 Rp 135,303 Rp -
b). Upah Rp 68,925 Rp - Rp 68,925 Rp -
Sub Total 4 Rp 204,229 Rp - Rp 68,925 Rp 135,303 Rp -
Rp 204,200
6. Pek. Hidran Umum (9 Unit)
a). Bahan Rp 52,938,887 Rp - Rp 7,101,004 Rp 45,837,882 Rp -
b). Upah Rp 30,481,500 Rp - Rp 21,006,573 Rp 9,474,927 Rp -
Sub Total 5 Rp 83,420,386 Rp - Rp 28,107,577 Rp 55,312,809 Rp -
Rp 83,420,400
5. Pek Sumur Gali ( 3Unit)
a). Bahan Rp 22,073,351 Rp 4,028,719 Rp - Rp 18,044,632 Rp -
b). Alat Rp 684,000 Rp - Rp 495,000 Rp 189,000 Rp -
c). Upah Rp 7,810,156 Rp - Rp - Rp 7,810,156 Rp -
Sub Total 5 Rp 30,567,507 Rp 4,028,719 Rp 495,000 Rp 26,043,788 Rp -
Rp 30,567,500
Total Sarana Air Minum (1 + 2 + 3 + 4 + 5 + 6) Rp 237,647,799 Rp 11,000,045 Rp 44,000,075 Rp 182,647,679 Rp -
Total Sarana Air Minum (1 + 2 + 3 + 4 + 5 + 6) Pembulatan Rp 237,647,750 Rp 11,000,000 Rp 44,000,000 Rp 182,647,700 Rp -
II SARANA SANITASI (SS)
1. Washtafel Sekolah (2 Unit)
a). Bahan Rp 1,149,349 Rp - Rp - Rp - Rp 1,149,349
b). Alat Rp - Rp - Rp - Rp - Rp -
c). Upah Rp 956,651 Rp - Rp - Rp - Rp 956,651
Sub Total 1 Rp 2,106,000 Rp - Rp - Rp - Rp 2,106,000
Rp 2,106,000 pembulatan Rp 2,106,000
2. WC Sekolah (1 Unit)
a). Bahan Rp 8,315,092 Rp - Rp - Rp - Rp 8,315,092
b). Alat Rp 150,000 Rp - Rp - Rp - Rp 150,000
c). Upah Rp 3,928,991 Rp - Rp - Rp - Rp 3,928,991
Sub Total 2 Rp 12,394,082 Rp - Rp - Rp - Rp 12,394,082
Rp 12,394,082 Pembulatan Rp 12,394,082
Total Sarana Sanitasi (1 + 2) Rp 14,500,000 Rp - Rp - Rp - Rp 14,500,000
III PELATIHAN
a) Pelatihan Satlak dan Lembaga Keswadayaan Masyarakat (LKM) Rp 4,500,000 Rp 4,500,000
b) Pelatihan Badan Pengelola Sarana (BPS) Rp 4,500,000 Rp 4,500,000
Total Pelatihan Rp 9,000,000 Rp - Rp - Rp 4,500,000 Rp 4,500,000
Rp 9,000,000 Rp 4,500,000
IV PROMOSI KESEHATAN
a) PHBS Rp 5,352,283 Rp 5,352,283
Total Promosi Kesehatan Rp 5,352,283 Rp - Rp - Rp 5,352,300 Rp -
Rp 5,352,300 Rp 5,352,300
V BIAYA OPERASIONAL LKM Rp 8,500,000 Rp 8,500,000
Total BOP Rp 8,500,000 Rp - Rp - Rp 8,500,000
Grand Total (I + II + III + IV + V) Rp 275,000,033 Rp 11,000,000 Rp 44,000,000 Rp 192,500,000 Rp 27,500,000
Rp 275,000,000 Rp 11,000,000 Rp 44,000,000 Rp 192,500,000 Rp 27,500,000
Sisa Dana Rp0 0
Total Dana Bantuan Rp275,000,000
Terbilang Dua Ratus Tujuh Puluh Lima Juta Rupiah.-
ULASI RENCANA ANGGARAN BIAYA

BOBOT (%)

19.15%
0.18%
6.65%
25.98%

6.12%
3.64%
9.76%

7.09%
0.05%
2.01%
9.15%

0.05%
0.03%
0.07%

19.25%
11.08%
30.33%

8.03%
0.25%
2.84%
11.12%

86.42%
86.42%
0.42%
0.00%
0.35%
0.77%

3.02%
0.05%
1.43%
4.51%

5.27%

1.64%
1.64%
3.27%

1.95%
1.95%

3.09%
3.09%
100.00%

0.00%
100.00%
PROGRAM PAMSIMAS
(PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT)
ANALISA & RAB SUMUR BOR
Provinsi/ Kabupaten/ Kecamatan/ Desa : Gorontalo/ Boalemo/ Wonosari / Harapan

NO RAB : 1 Sub.Pek./Kegiatan: Sumur Bor Dangkal ( Kedalaman 25 Meter )


Pekerjaan/ Kegiatan : Sarana Air Minum Dimensi : 12 Titik

Volume Biaya (Rp)


Konstribusi Masyarakat Kontribusi
NO URAIAN Satuan Harga Satuan (Rp)
Total APBN APBD Total APBN APBD
inCash inKind inCash Inkind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8 12=5x8 13=6x8
I BAHAN
1 Pompa Air ( Jet Pump 300 watt ) 1.00 - - 1.00 - unit Rp 3,700,000 Rp 3,700,000 Rp - Rp - Rp 3,700,000 Rp -
2 Penambahan Daya Listrik (Mesin Genset 950 watt) 1.00 - - 1.00 - ls Rp 1,800,000 Rp 1,800,000 Rp - Rp - Rp 1,800,000 Rp -
3 Pipa Chasing PVC SNI dia 3" + Perlengkapan 25.00 - - 25.00 - m Rp 114,000 Rp 2,850,000 Rp - Rp - Rp 2,850,000 Rp -
4 Pipa Pengisapan 1" PVC SNI+ Perlengkapan 30.00 - - 30.00 - m Rp 270,000 Rp 8,100,000 Rp - Rp - Rp 8,100,000 Rp -
Sub Total I Rp 16,450,000 Rp - Rp - Rp 16,450,000 Rp -
II UPAH PENGEBORAN SUMUR
1 Pekerja/Tukang Bor Sumur 1.00 - - 1.00 - HOK Rp 2,000,000 Rp 2,000,000 Rp - Rp - Rp 2,000,000 Rp -
Sub Total II Rp 2,000,000 Rp - Rp - Rp 2,000,000 Rp -
Jumlah Total Rp 18,450,000 Rp - Rp - Rp 18,450,000 Rp -
Total 12 Rp 221,400,000 Rp - Rp - Rp 221,400,000 Rp -

Boalemo, Juni 2010

Disetujui Oleh : Dibuat Oleh :

Ketua DPMU Koordinator LKM 0 -

0 0 0 -
DESA HARAPAN

Pekerjaan : HIDRAN UMUM


Jumlah Unit Bangunan : 12 Unit

No. Sket Perhitungan


Perhitungan Volume dan Material
I Pek.Persiapan
1 Pengukuran Bouplank dan Profil
Panjang Pengukuran Bouplank dan Profil
P = 1.3 + 1.3 + 2.3 + 2.3
1.3 = 7.2 m2

2.3

II Pek.Tanah
1 Galian Tanah Volume Galian tanah

2.3 V = Lbr x Pjg x Tggi


= 2.3 x 1.3 x 0.4
= 1.196 m 3

0.4

1.3

2 Urugan pasir Bawah Pondasi Volume Urugan Pasir Bawah Pondasi

V = Lbr x Pjg x Tggi


0.1 = 1.3 x 2.3 x 0.1
2.3 = 0.299 m3
1.3

3 Pek. Pondasi Batu Kali


0.3 Volume Pas. Pondasi Batu Kali
L pondasi = 1 x (a+b) x Tggi V = 0.36
2 = 0.36
0.8 = 0.3 + 0.6 x 0.8 = 2.592
2
= 0.9 x 0.8
0.6 2
= 0.45 x 0.8
= 0.36 m2

4 Pek. Urugan Tanah Dibawah Lantai


Volume Urugan Tanah Dibawah Lantai
0.7 L Urugan = 1 x (a+b) x Tggi V = 0.26
2 = 0.26
= 0.1 + 0.7 x 0.65 = 0.442
0.65 2
= 0.8 x 0.65
2
0.1 = 0.4 x 0.65
= 0.26 m2

4 Pek. Urugan Tanah Dibawah Lantai


0.7 Volume Urugan Tanah Dibawah Lantai
L Urugan = 1 x (a+b) x Tggi V = 0.075
…………. 0.15 2 = 0.075
= 0.5 + 0.5 x 0.15 = 0.128
2
= 1 x 0.15
2
0.5 = 0.5 x 0.15
= 0.075 m2

III Pek. Beton


1 Pek. Lantai Beton Tumbuk 1:2:3 Volume Pek. Lantai Beton

2.3 V = Lbr x Pjg x Tggi


= 1.3 x 2.3 x 0.1

PERHITUNGAN VOLUME HIDRAN UMUM Halaman 20 dari 153


DESA HARAPAN

Pekerjaan : HIDRAN UMUM


Jumlah Unit Bangunan : 12 Unit

No. Sket Perhitungan


= 0.299 m 3

0.1

1.3

2 Pek Sloof & Ring Balk Volume Pek. Sloof & Ring Balk

V = Lbr x Pjg x Tggi


= 0.15 x 7.2 x 0.15
0.15 7.2 = 0.162 m3

0.15

3 Pek. Plat Atap Volume Plat Atap

2.3 V1 = Lbr x Pjg x Tggi V tot = V1


= 1.3 x 2.3 x 0.1 = 0.299
= 0.299 m3 = 0.263
0.1

1.3

4 Pek. Tutup Manhole Volume Manhole

0.6 V2 = Lbr x Pjg x Tggi


= 0.6 x 0.6 x 0.1
0.1 = 0.036 m3
0.6

PERHITUNGAN VOLUME HIDRAN UMUM Halaman 21 dari 153


DESA HARAPAN

Pekerjaan : HIDRAN UMUM


Jumlah Unit Bangunan : 12 Unit

No. Sket Perhitungan

5 Pek. Kolom 15/15 Volume Kolom

0.15 V = Lbr x Pjg x Tggi


= 0.15 x 0.15 x 1
= 0.023 m3
1
Vtot = V x Jumlah
= 0.023 x 4 Kolom
= 0.09 m3

0.15

IV Pek. Bak Hidran Volume Pek. Bak Hidran


1 Pek. Pas. Bata Bak Hydran SP 1 : 4
L = Lbr x Tggi
= 2 x 1
= 2 m2

1 L1 = Lbr x Jumlah
= 2 x 2 sisi
= 4 m2

2
L = Lbr x Tggi
= 1 x 1
= 1 m2
1
L2 = Lbr x Jumlah
= 1 x 2 sisi
= 2 m2
1
Ltot = 4 + 2
= 6 m 2

2 Plesteran & Acian


a Dinding Bak Dalam Dan Luar Luas Plesteran Campuran 1 : 4

L1 = Vtot Pas. Bata x Jumlah


1.3 = 6 x 2 Dalam & Luar
= 12 m2
2

1.3

1
b Lantai L2 = Panjang x Tggi
= 2 x 1
1 = 2 m2

Luas Total Plesteran Campuran 1 : 4


2 = L1 + L2
= 12 + 2
= 14 m2

V Pek. SPAL
a Saluran Pembuangan
1 Galian Tanah Volume Galian tanah

8 V = Lbr x Pjg x Tggi


= 0.45 x 8 x 0.3
= 1.08 m3
0.3

0.45
2 Pas. Bata Volume Pas. Bata

PERHITUNGAN VOLUME HIDRAN UMUM Halaman 22 dari 153


DESA HARAPAN

Pekerjaan : HIDRAN UMUM


Jumlah Unit Bangunan : 12 Unit

No. Sket Perhitungan

L = Lbr x Tggi L2 = Lbr


1 0.4 = 8 x 0.4 = 8
= 3.2 m2 = 1.2
8
L1 = Lbr x Jumlah Ltot = L1
2 0.15 = 3.2 x 2 Kiri & Kanan = 6.4
= 6.4 m2 = 7.6
8

3 Pek. Plesteran Volume Pek. Plesteran

1 0.15 L1 = Lbr x Tggi x Jumlah


= 8 x 0.15 x 3 Kiri,Kanan,Bawah
8 = 3.6 m2

2 0.25 L2 = Lbr x Tggi x Jumlah


= 8 x 0.25 x 2 Sisi
8 = 4 m2

3 0.4 L3 = Lbr x Tggi x Jumlah


= 8 x 0.4 x 2 Sisi
= 6.4 m2
8
Ltot = L1 + L2 + L3
= 3.6 + 4 + 6.4
= 14 m2

PERHITUNGAN VOLUME HIDRAN UMUM Halaman 23 dari 153


DESA HARAPAN

Pekerjaan : HIDRAN UMUM


Jumlah Unit Bangunan : 12 Unit

No. Sket Perhitungan

b Lubang Pembuangan
1 Galian Tanah Volume Galian tanah

1 V = Lbr x Pjg x Tggi


= 1 x 1 x 1.5
= 1.5 m3
1.5

2 Pek. Pas. Bata Volume Pas. Bata

1 L1 = Lbr x Tggi x Jumlah


1.5 = 0.7 x 1.5 x 2 sisi
= 2.1 m 2

0.7
L2 = Lbr x Tggi x Jumlah
2 = 1 x 1.5 x 2 sisi
1.5 = 3 m2

1 Ltot = L1 + L2
= 2.1 + 3
= 5.1 m2

3 Pek. Plat Penutup Lubang Volume Plat Penutup Lubang

1 V = Lbr x Pjg x Tggi


= 1 x 1 x 0.1
0.1 = 0.1 m3
1

4 Pek. Plesteran Volume Plesteran

1 L1 = Lbr x Tggi x Jumlah


1.5 = 0.7 x 1.5 x 4 sisi
= 4.2 m2

0.7 L2 = Lbr x Tggi


2 = 1 x 1
1 = 1 m2

Ltot = L1 + L2
1 = 4.2 + 1
= 5.2 m2

VI Pengecatan
1 Dinding Bak Luar Depan&Belakang Luas Pengecatan
L1 = Lebar x Tggi x Jumlah
= 2.3 x 2 x 2 sisi
2 = 9.2 m2

2.3
L2 = Lebar x Tggi x Jumlah
2 Dinding Bak Kiri dan Kanan = 1.3 x 2 x 2 sisi
= 5.2 m2
2
L3 = Lebar x Pnjng
= 2.3 x 1.3
1.3 = 2.99 m2
3 Pelat Tutup Bak
Luas Total Pengecatan
= L1 + L2 + L3
1.3 = 9.2 + 5.2 + 2.99
PERHITUNGAN VOLUME HIDRAN UMUM Halaman 24 dari 153
DESA HARAPAN

Pekerjaan : HIDRAN UMUM


Jumlah Unit Bangunan : 12 Unit

No. Sket Perhitungan


= 17.39 m 2

2.3

VII Pekerjaan Lain-Lain


Pekerjaan Lain-Lain
1/ Pembuatan dan Pemasangan Ventilasi
Udara Pipa PVC Dia. 2 Inch Sesuai Gambar
Pipa PVC Dia. 2 Inch
Tee PVC Dia. 2 Inch
Double Neple PVC Dia. 2 Inch
Knee PVC Dia. 2 Inch

2/ Pek. Mata Kran


Kran Air

3/ Pek. Stop Kran Ø 2 " (Penyedot)


Stop Kran

PERHITUNGAN VOLUME HIDRAN UMUM Halaman 25 dari 153


DESA HARAPAN

Perhitungan Vol Sat Keterangan

7.20 m1

1.20 m3

0.30 m3

2.59 m3
x p
x 7.2
m3

0.44 m3
x p
x 1.7
m3

0.13 m3
x p
x 1.7
m3

0.30 m3

PERHITUNGAN VOLUME HIDRAN UMUM Halaman 26 dari 153


DESA HARAPAN

Perhitungan Vol Sat Keterangan

0.16 m3

0.26 m3

- V2
- 0.036

0.04 m3

PERHITUNGAN VOLUME HIDRAN UMUM Halaman 27 dari 153


DESA HARAPAN

Perhitungan Vol Sat Keterangan

0.09 m3

6.00 m2

14.00 m2

1.08 m3

7.60 m2

PERHITUNGAN VOLUME HIDRAN UMUM Halaman 28 dari 153


DESA HARAPAN

Perhitungan Vol Sat Keterangan

x Tggi
x 0.15
m2

+ L2
+ 1.2
m2

14.00 m2

PERHITUNGAN VOLUME HIDRAN UMUM Halaman 29 dari 153


DESA HARAPAN

Perhitungan Vol Sat Keterangan

1.50 m3

5.10 m2

0.10 m3

5.20 m2

17.39 m2

PERHITUNGAN VOLUME HIDRAN UMUM Halaman 30 dari 153


DESA HARAPAN

Perhitungan Vol Sat Keterangan

1.00 ls
0.50 M1
1.00 Bh
2.00 Bh
2.00 Bh

4.00 Bh

1.00 Bh

PERHITUNGAN VOLUME HIDRAN UMUM Halaman 31 dari 153


PROGRAM PAMSIMAS
(PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT)
ANALISA & RAB HYDRAN UMUM
Provinsi/ Kabupaten/ Kecamatan/ Desa : Gorontalo/ Boalemo/ Wonosari / Harapan

NO RAB : 2
Pekerjaan/ Kegiatan : Sarana Air Minum

NO URAIAN Koef. Volume Satuan

1 2 3 4
I PEK. PEMASANGAN BOUWPLANK 7.20 m1
Kayu 5/7 Klas III 0.012 0.086 m3
Paku Biasa 2" - 5" 0.020 0.144 kg
Kayu Papan 3/20 Klas III 0.007 0.050 m3
Tukang Kayu 0.100 0.720 HOK
Pekerja 0.100 0.720 HOK
Total
Sub Total I
II PEK.TANAH/PONDASI
1 Galian Tanah Pondasi 1.20 m3
Pekerja 0.900 1.076 HOK
Total
2 Urugan Pasir Bawah Pondasi 0.30 m3
Pasir Urug 1.200 0.359 m3
Pekerja 0.300 0.090 HOK
Total
3 Pas.Pondasi Batu Kali 1:4 2.59 m3
Batu Kali/Belah 15 cm/20 cm 1.200 3.110 m3
Semen PC 163.000 422.496 Kg
Pasir Pasang 0.520 1.348 m3
Tukang Batu 0.750 1.944 HOK
Pekerja 1.500 0.135 HOK
Total
4 Urugan Tanah Di Bawah lantai 0.44 m3
Pekerja 0.500 0.221 HOK
Total
5 Urugan Pasir Dibawah lantai 0.13 m3
Pasir Urug 1.200 0.153 m3
Pekerja 0.250 0.032 HOK
Total
Sub Total II
III PEK. BETON
1 Pek. Lantai Beton Tumbuk 1:2:3 0.30 m3
Kayu Kls. III 0.270 0.081 m3
Paku Biasa 2.000 0.598 kg
Besi Beton Polos 105.000 31.395 kg
Kawat Beton Polos 2.250 0.673 kg
Semen PC 225.000 67.275 Kg
Pasir Beton 0.520 0.155 m3
Kerikil beton 0.780 0.233 m3
Tukang Batu 0.350 0.105 HOK
Tukang Kayu 0.120 0.036 HOK
Tukang Besi 0.120 0.036 HOK
Pekerja 1.200 0.359 HOK
Total
2 Pek. Sloof 0.16 m3
Kayu Kls. III papan 0.270 0.044 m3
Paku Biasa 2.000 0.324 kg
Besi Beton Polos 105.000 17.010 kg
Kawat Beton Polos 3.000 0.486 kg
Semen PC 225.000 36.450 Kg
Pasir Beton 0.540 0.087 m3
Kerikil beton 0.810 0.131 m3
Tukang Batu 0.275 0.045 HOK
Tukang Kayu 1.560 0.253 HOK
Tukang Besi 1.400 0.227 HOK
Pekerja 5.650 0.915 HOK
Total
3 Pek. Kolom 0.09 m3
Kayu Kls. III papan 0.320 0.029 m3
Paku Biasa 2.000 0.180 kg
Besi Beton Polos 105.000 9.450 kg
Kawat Beton Polos 2.240 0.202 kg
Semen PC 225.000 20.250 kg
Pasir Beton 0.540 0.049 m3
Kerikil beton 0.810 0.073 m3
Kayu Kls. III Balok 0.150 0.014 m3
Tukang Batu 0.275 0.025 HOK
Tukang Kayu 1.560 0.140 HOK
Tukang Besi 1.400 0.126 HOK
Pekerja 5.650 0.509 HOK
Total
4 Pek. Ring Balk 0.16 m3
Kayu Kls. III papan 0.270 0.044 m3
Paku Biasa 2.000 0.324 kg
Besi Beton Polos 105.000 17.010 kg
Kawat Beton Polos 3.000 0.486 kg
Semen PC 225.000 36.450 kg
Pasir Beton 0.540 0.087 m3
Kerikil beton 0.810 0.131 m3
Tukang Batu 0.275 0.045 m3
Tukang Kayu 1.560 0.253 HOK
Tukang Besi 1.400 0.227 HOK
Pekerja 5.650 0.915 HOK
Total
5 Pek. Plat Penutup 0.26 m3
Kayu Kls. III 0.270 0.071 m3
Paku Biasa 2.000 0.526 kg
Besi Beton Polos 105.000 27.615 kg
Kawat Beton Polos 2.250 0.592 kg
Semen PC 225.000 59.175 kg
Pasir Beton 0.520 0.137 m3
Kerikil beton 0.780 0.205 m3
Tukang Batu 0.350 0.092 HOK
Tukang Kayu 0.120 0.032 HOK
Tukang Besi 0.120 0.032 HOK
Pekerja 1.200 1.098 HOK
Total
6 Pek. Manhole 0.04 m3
Kayu Kls. III 0.270 0.010 m3
Paku Biasa 2.000 0.072 kg
Besi Beton Polos 105.000 3.780 kg
Kawat Beton Polos 2.250 0.081 kg
Semen PC 225.000 8.100 kg
Pasir Beton 0.520 0.019 m3
Kerikil beton 0.780 0.028 m3
Tukang Batu 0.350 0.013 m3
Tukang Kayu 0.120 0.004 HOK
Tukang Besi 0.120 0.004 HOK
Pekerja 1.200 0.043 HOK
Total
Sub Total III
IV 1 Pek. Pas. Bata Bak Hydran SP 1 : 4 6.00 m2
Batu Bata 70.000 433.015 bh
Semen PC 11.500 69.000 kg
Pasir Pasang 0.043 0.258 m3
Tukang Batu 0.100 0.600 HOK
Pekerja 0.300 1.800 HOK
Total
2 Plesteran 1:4 14.00 m2
Semen PC 6.240 87.360 kg
Pasir Pasang 0.024 0.336 m3
Tukang Batu 0.150 2.100 HOK
Pekerja 0.300 4.200 HOK
Total
3 Pek. Acian 14.00 m2
Semen PC 3.250 45.500 kg
Tukang Batu 0.100 1.400 HOK
Pekerja 0.200 2.800 HOK
Total
Sub Total IV
V 1 Pek. Mata Kran 3/4" 4.00 bh
Kran Air 1.000 4.000 bh
Selotip 0.025 0.100 bh
Tukang 0.100 0.400 HOK
Pekerja 0.010 0.040 HOK
Total
2 Pek. Stop Kran Ø 1 " (Penyedot) 1.00 ls
Stop Kran 1.000 1.000 bh
Selotip 0.350 0.350 bh
Tukang 0.060 0.060 HOK
Pekerja 0.360 0.360 HOK
Total
3 Pek.Pipa PVC Ø 1" (Pentilasi) 1.00 ls
Pipa PVC SNI 1" 1.200 1.200 m1
Selang Air 1.000 1.000 m2
Asesoris 0.240 0.240 bh
Tukang 0.060 0.060 HOK
Pekerja 0.360 0.360 HOK
Total
Sub Total V
VI PEKERJAAN SPAL
A PEKERJAAN SALURAN
1 GALIAN TANAH 1.08 m3
Pekerja 0.750 0.810 HOK
Total
2 PASANGAN BATA 7.60 m2
Batu Bata 70.000 532.000 bh
Pasir Pasang 0.043 0.327 m3
Semen PC 11.500 87.400 kg
Pekerja 0.300 2.280 HOK
Tukang Batu 0.100 0.760 HOK
Total
3 PLESTERAN 1 : 4 14.00 m2
Pasir Pasang 0.024 0.336 m3
Semen PC 6.240 87.360 kg
Pekerja 0.300 4.200 HOK
Tukang Batu 0.150 2.100 HOK
Total
B PEKERJAAN LUBANG PEMBUANGAN
1 GALIAN TANAH 1.50 m3
Pekerja 0.900 1.350 HOK
Total
2 PASANGAN BATA 1 : 4 5.10 m2
Batu Bata 70.000 357.000 bh
Pasir Pasang 0.043 0.219 m3
Semen PC 11.500 58.650 kg
Pekerja 0.300 1.530 HOK
Tukang Batu 0.100 0.510 HOK
Total
3 PEKERJAAN PLAT PENUTUP LUBANG 0.10 m3
Besi Beton Polos 100.000 10.000 kg
Kawat Beton Polos 2.250 0.225 kg
Kayu Kls. III Balok 0.120 0.012 m3
Kayu Kls. III papan 0.320 0.032 m3
Kerikil beton 0.780 0.078 m3
Paku Biasa 3.200 0.320 kg
Pasir Beton 0.520 0.052 m3
Semen PC 225.000 22.500 kg
Pekerja 1.100 0.110 HOK
Tukang Batu 0.350 0.035 HOK
Tukang Besi 0.120 0.012 HOK
Tukang Kayu 0.110 0.011 HOK
Total
4 PEKERJAAN PLESTERAN 1 : 4 5.20 m2
Pasir Pasang 0.024 0.125 m3
Semen PC 6.240 32.448 kg
Pekerja 0.300 1.560 HOK
Tukang Batu 0.150 0.780 HOK
Total
Sub Total VI
VII PENGECETAN/FINISING
1 Pek. Cat 17.390
Plamur Tembok 0.100 1.739 m2
Cat Dasar 0.100 1.739 m2
Cat Tembok 0.260 4.521 m2
Tukang Cat 0.063 1.096 HOK
Pekerja 0.020 0.348 HOK
Total
Sub Total VII
VIII ALAT 1.000
Cangkul 1.000 1.000 Unit
Sekop 1.000 1.000 Unit
Linggis 1.000 1.000 Unit
Ember 2.000 2.000 Unit
Total
Sub Total VIII
Jumlah Total
Total 12 Unit
PROGRAM PAMSIMAS
AIR MINUM & SANITASI BERBASIS MASYARAKAT)
ANALISA & RAB HYDRAN UMUM
camatan/ Desa : Gorontalo/ Boalemo/ Wonosari / Harapan

Sub Pekerjaan : Hydran Umum


Dimensi : 12 Unit

Biaya (Rp)
Harga Satuan (Rp)
Total

5 6=2x5

Rp 1,750,000 Rp 151,200
Rp 14,000 Rp 2,016
Rp 1,750,000 Rp 88,200
Rp 65,000 Rp 46,800
Rp 45,000 Rp 32,400
Total Rp 320,616
Sub Total I Rp 320,616

Rp 45,000 Rp 48,438
Total Rp 48,438
###
Rp 85,000 Rp 30,498
Rp 45,000 Rp 4,037
Total Rp 34,535

Rp 100,000 Rp 311,040
Rp 1,400 Rp 591,494
Rp 85,000 Rp 114,566
Rp 65,000 Rp 126,360
Rp 45,000 Rp 6,055
Total Rp 1,149,516

Rp 45,000 Rp 9,945
Total Rp 9,945

Rp 85,000 Rp 13,005
Rp 45,000 Rp 1,434
Total Rp 14,439
Sub Total II Rp 1,256,872

Rp 1,750,000 Rp 141,278
Rp 14,000 Rp 8,372
Rp 9,000 Rp 282,555
Rp 20,000 Rp 13,455
Rp 1,400 Rp 94,185
Rp 85,000 Rp 13,216
Rp 115,000 Rp 26,820
Rp 65,000 Rp 6,802
Rp 65,000 Rp 2,332
Rp 65,000 Rp 2,332
Rp 45,000 Rp 16,146
Total Rp 607,493
Rp 65,000
Rp 1,750,000 Rp 76,545
Rp 14,000 Rp 4,536
Rp 9,000 Rp 153,090
Rp 20,000 Rp 9,720
Rp 1,400 Rp 51,030
Rp 85,000 Rp 7,436
Rp 115,000 Rp 15,090
Rp 65,000 Rp 2,896
Rp 65,000 Rp 16,427
Rp 65,000 Rp 14,742
Rp 45,000 Rp 41,189
Total Rp 392,700

Rp 1,750,000 Rp 50,400
Rp 14,000 Rp 2,520
Rp 9,000 Rp 85,050
Rp 20,000 Rp 4,032
Rp 1,400 Rp 28,350
Rp 85,000 Rp 4,131
Rp 115,000 Rp 8,384
Rp 1,750,000 Rp 23,625
Rp 65,000 Rp 1,609
Rp 65,000 Rp 9,126
Rp 65,000 Rp 8,190
Rp 45,000 Rp 22,883
Total Rp 248,299

Rp 1,750,000 Rp 76,545
Rp 14,000 Rp 4,536
Rp 9,000 Rp 153,090
Rp 20,000 Rp 9,720
Rp 1,400 Rp 51,030
Rp 85,000 Rp 7,436
Rp 115,000 Rp 15,090
Rp 65,000 Rp 2,896
Rp 65,000 Rp 16,427
Rp 65,000 Rp 14,742
Rp 45,000 Rp 41,189
Total Rp 392,700
Rp 1,750,000 Rp 124,268
Rp 14,000 Rp 7,364
Rp 9,000 Rp 248,535
Rp 20,000 Rp 11,835
Rp 1,400 Rp 82,845
Rp 85,000 Rp 11,625
Rp 115,000 Rp 23,591
Rp 65,000 Rp 5,983
Rp 65,000 Rp 2,051
Rp 65,000 Rp 2,051
Rp 45,000 Rp 49,426
Total Rp 569,574

Rp 1,750,000 Rp 17,010
Rp 14,000 Rp 1,008
Rp 9,000 Rp 34,020
Rp 20,000 Rp 1,620
Rp 1,400 Rp 11,340
Rp 85,000 Rp 1,591
Rp 115,000 Rp 3,229
Rp 65,000 Rp 819
Rp 65,000 Rp 281
Rp 65,000 Rp 281
Rp 45,000 Rp 1,944
Total Rp 73,143
Sub Total III Rp 2,283,910

Rp 500 Rp 216,507
Rp 1,400 Rp 96,600
Rp 85,000 Rp 21,930
Rp 65,000 Rp 39,000
Rp 45,000 Rp 81,000
Total Rp 455,037
###
Rp 1,400 Rp 122,304
Rp 85,000 Rp 28,560
Rp 65,000 Rp 136,500
Rp 45,000 Rp 189,000
Total Rp 476,364

Rp 1,400 Rp 63,700
Rp 65,000 Rp 91,000
Rp 45,000 Rp 126,000
Total Rp 280,700
Sub Total IV Rp 1,212,101
###
Rp 25,000 Rp 100,000
Rp 4,000 Rp 400
Rp 65,000 Rp 26,000
Rp 45,000 Rp 1,800
Total Rp 128,200

Rp 60,000 Rp 60,000
Rp 4,000 Rp 1,400
Rp 65,000 Rp 3,900
Rp 45,000 Rp 16,200
Total Rp 81,500

Rp 9 Rp 11
Rp 15,000 Rp 15,000
Rp 7,500 Rp 1,800
Rp 65,000 Rp 3,900
Rp 45,000 Rp 16,200
Total Rp 36,911
Sub Total V Rp 246,611

Rp 45,000 Rp 36,450
Total Rp 36,450
Rp 500 Rp 266,000
Rp 85,000 Rp 27,778
Rp 1,400 Rp 122,360
Rp 45,000 Rp 102,600
Rp 65,000 Rp 49,400
Total Rp 568,138

Rp 85,000 Rp 28,560
Rp 1,400 Rp 122,304
Rp 45,000 Rp 189,000
Rp 65,000 Rp 136,500
Total Rp 476,364

Rp 45,000 Rp 60,750
Total Rp 60,750

Rp 500 Rp 178,500
Rp 85,000 Rp 18,641
Rp 1,400 Rp 82,110
Rp 45,000 Rp 68,850
Rp 65,000 Rp 33,150
Total Rp 381,251
Rp 9,000 Rp 90,000
Rp 20,000 Rp 4,500
Rp 1,750,000 Rp 21,000
Rp 1,750,000 Rp 56,000
Rp 115,000 Rp 8,970
Rp 14,000 Rp 4,480
Rp 85,000 Rp 4,420
Rp 1,400 Rp 31,500
Rp 45,000 Rp 4,950
Rp 65,000 Rp 2,275
Rp 65,000 Rp 780
Rp 65,000 Rp 715
Total Rp 229,590

Rp 85,000 Rp 10,608
Rp 1,400 Rp 45,427
Rp 45,000 Rp 70,200
Rp 65,000 Rp 50,700
Total Rp 176,935
Sub Total VI Rp 1,929,478

###
Rp 7,600 Rp 13,216
Rp 5,000 Rp 8,695
Rp 16,000 Rp 72,342
Rp 65,000 Rp 71,212
Rp 45,000 Rp 15,651
Total Rp 181,117
Sub Total VII Rp 181,117
###
Rp 50,000 Rp 50,000
Rp 50,000 Rp 50,000
Rp 35,000 Rp 35,000
Rp 15,000 Rp 30,000
Total Rp 165,000
Sub Total VIII Rp 165,000
Jumlah Total Rp 7,595,705
Total 12 Unit Rp 91,148,459
PROGRAM PAMSIMAS
(PROGRAM PENYEDIAAN AIR MINUM DAN SANITASI BERBASIS MASYARAKAT)
RENCANA ANGGARAN BIAYA
Propinsi / Kabupaten / Kecamatan / Desa : Gorontalo / Boalemo / Wonosari/ Harapan

NO RAB : 2
Pekerjaan : Sarana Air Minum

VOLUME BIAYA
HARGA SATUAN
NO URAIAN KONTRIBUSI MASYARAKAT SATUAN (Rp)
TOTAL APBN APBD TOTAL
IN CASH IN KIND
1 Bahan
Pipa PVC SNI 1" 1.200 - - 1.200 - m Rp 9 Rp 11
Asesoris Pipa 0.240 - - 0.240 - ls Rp 7,500 Rp 1,800
Batu Bata 1,322.015 - - 1,322.015 - bh Rp 500 Rp 661,007
Batu Kali/Batu Gunung 3.110 - 1.555 1.555 - m3 Rp 100,000 Rp 311,040
Besi Beton Polos 116.260 - - 116.260 - Kg Rp 9,000 Rp 1,046,340
Cat Dasar 1.739 - - 1.739 - kg Rp 5,000 Rp 8,695
Cat Tembok 4.521 - - 4.521 - kg Rp 16,000 Rp 72,342
Kawat Beton Polos 2.744 - - 2.744 - kg Rp 20,000 Rp 54,882
Kayu Kls. III Balok 0.112 - 0.050 0.062 - m3 Rp 1,750,000 Rp 195,825
Kayu Kls. III Papan 0.360 - 0.153 0.207 - m4 Rp 1,750,000 Rp 630,245
Kerikil 0.880 - 0.440 0.440 - m3 Rp 115,000 Rp 101,175
Kran 4.000 - - 4.000 - bh Rp 25,000 Rp 100,000
Paku Biasa 2.488 - - 2.488 - kg Rp 14,000 Rp 34,832
Pasir Urug 0.512 - 0.154 0.358 - m3 Rp 85,000 Rp 43,503
Pasir Pasang 2.949 - 0.885 2.064 - m3 Rp 85,000 Rp 250,643
Pasir Beton 0.587 - - 0.587 - m3 Rp 85,000 Rp 49,854
Plamur Tembok 1.739 - - 1.739 - kg Rp 7,600 Rp 13,216
Seal Tape 0.450 - 0.450 - - bh Rp 4,000 Rp 1,800
Semen PC 1,140.414 570.207 - 570.207 - Kg Rp 1,400 Rp 1,596,580
Stop Kran 1.000 - - 1.000 - bh Rp 60,000 Rp 60,000
Selang Air 1.000 - 1.000 - - m Rp 15,000 Rp 15,000
Sub Total I Rp 5,248,790
2 Alat
Cangkul 1.000 - 1.000 - - bh Rp 50,000 Rp 50,000
Sekop 1.000 - 1.000 - - bh Rp 35,000 Rp 35,000
Linggis 1.000 - 1.000 - - bh Rp 50,000 Rp 50,000
Ember 2.000 - 2.000 - - bh Rp 15,000 Rp 30,000
Sub Total II Rp 165,000
3 Upah
Pekerja 27.861 - 27.861 - - hok Rp 45,000 Rp 1,253,735
Tukang Batu 14.280 - - 14.280 - hok Rp 65,000 Rp 928,179

Sub Total III Rp 2,181,915


TOTAL Rp 7,595,705
Jumlah Unit 12 Rp 91,148,459

Disetujui Oleh : Dibuat Oleh :

Ketua DPMU Koordinator LKM CF Teknik

0 0 Rifaldi Alam Rivai, ST


PROGRAM PAMSIMAS
IR MINUM DAN SANITASI BERBASIS MASYARAKAT)
NCANA ANGGARAN BIAYA
tan / Desa : Gorontalo / Boalemo / Wonosari/ Harapan

Sub Pekerjaan : Hydran Umum


Dimensi : 12 Unit

BIAYA
KONTRIBUSI MASYARAKAT
APBN APBD
INCASH IN KIND

Rp - Rp - Rp 11 Rp -
Rp - Rp - Rp 1,800 Rp -
Rp - Rp - Rp 661,007 Rp -
Rp - Rp 155,520 Rp 155,520 Rp -
Rp - Rp - Rp 1,046,340 Rp -
Rp - Rp - Rp 8,695 Rp -
Rp - Rp - Rp 72,342 Rp -
Rp - Rp - Rp 54,882 Rp -
Rp - Rp 88,121 Rp 107,704 Rp -
Rp - Rp 267,944 Rp 362,301 Rp -
Rp - Rp 50,587 Rp 50,587 Rp -
Rp - Rp - Rp 100,000 Rp -
Rp - Rp - Rp 34,832 Rp -
Rp - Rp 13,051 Rp 30,452 Rp -
Rp - Rp 75,193 Rp 175,450 Rp -
Rp - Rp - Rp 49,854 Rp -
Rp - Rp - Rp 13,216 Rp -
Rp - Rp 1,800 Rp - Rp -
Rp 798,290 Rp - Rp 798,290 Rp -
Rp - Rp - Rp 60,000 Rp -
Rp - Rp 15,000 Rp - Rp -
Rp 798,290 Rp 667,216 Rp 3,783,285 Rp -

Rp - Rp 50,000 Rp - Rp -
Rp - Rp 35,000 Rp - Rp -
Rp - Rp 50,000 Rp - Rp -
Rp - Rp 30,000 Rp - Rp -
Rp - Rp 165,000 Rp - Rp -

Rp - Rp 1,253,735 Rp - Rp -
Rp - Rp - Rp 928,179 Rp -

Rp - Rp 1,253,735 Rp 928,179 Rp -
Rp 798,290 Rp 2,085,951 Rp 4,711,464 Rp -
Rp 9,579,478 Rp 25,031,414 Rp 56,537,567 Rp -

Boalemo, Juni 2010

Dibuat Oleh :

Satlak Pamsimas

0
REKAPITULASI RENCANA TERMIN

BIAYA (Rp)
NO URAIAN KONTRIBUSI MASYARAKAT BOBOT (%)
TOTAL APBN TOTAL
IN CASH IN KIND
1 2 3=4+5+6+7 4 5 6 7 8
TERMIN 1
1. Pek Sumur Gali ( 3Unit)
a). Bahan Rp 22,073,351 Rp 4,028,719 Rp 18,044,632 Rp 22,073,351 9.56%
b). Alat Rp 189,000 Rp - Rp 189,000 Rp 189,000 0.08%
c). Upah Rp 7,810,156 Rp - Rp 7,810,156 Rp 7,810,156 3.38%
Rp 30,072,507 Rp 4,028,719 Rp - Rp 26,043,788 Rp 30,072,507 13.02%
2. Promosi Kesehatan Masyarakat
a). Promkes STOP BABS Rp 544,000 Rp 544,000 Rp 544,000 0.24%
b). Promkes Penggunaan air bersih yang sehat dan aman dari pencemaran Rp 358,500 Rp 358,500 Rp 358,500 0.16%
c). CTPS Rp 1,166,000 Rp 1,166,000 Rp 1,166,000 0.50%
Rp 2,068,500 Rp - Rp - Rp 2,068,500 Rp 2,068,500 0.90%
3. Hidran Umum ( 1 Unit )
a). Bahan Rp 5,093,098 Rp 5,093,098 Rp 5,093,098 2.20%
b). Alat Rp 1,052,770 Rp 1,052,770 Rp 1,052,770 0.46%
Rp 6,145,868 Rp - Rp - Rp 6,145,868 Rp 6,145,868 2.66%
TOTAL TERMIN 1 Rp 38,286,875 Rp 4,028,719 Rp - Rp 34,258,156 Rp 38,286,875 16.57%
TERMIN 2
1. Pek. Sumur Bor Dalam
a). Bahan Rp 16,827,000 Rp 16,827,000 Rp 16,827,000 7.28%
c). Upah Rp 10,000,000 Rp - Rp 10,000,000 Rp 10,000,000 4.33%
Rp 26,827,000 Rp - Rp - Rp 26,827,000 Rp 26,827,000 11.61%
2. Pek Menara (1 Unit)
a). Bahan Rp 19,091,519 Rp 3,217,000 Rp 15,874,519 Rp 19,091,519 8.26%
b). Alat Rp 150,000 Rp 150,000 Rp - Rp 150,000 0.06%
c). Upah Rp 5,527,752 Rp 351,077 Rp 5,176,676 Rp 5,527,752 2.39%
Rp 24,769,272 Rp 3,718,077 Rp - Rp 21,051,195 Rp 24,769,272 10.72%
3. Pek. Jaringan Pipa 2.700 M ( Dusun 2 dan 3)
a). Bahan Rp 48,482,662 Rp 2,727,900 Rp 45,754,762 Rp 48,482,662 20.99%
b). Alat Rp - Rp - Rp - 0.00%
c). Upah Rp 8,048,171 Rp 525,350 Rp 7,522,821 Rp 8,048,171 3.48%
Rp 56,530,834 Rp 3,253,250 Rp - Rp 53,277,584 Rp 56,530,834 24.47%
TOTAL TERMIN 2 Rp 108,127,105 Rp 6,971,327 Rp - Rp 101,155,779 Rp 108,127,105 46.81%
TERMIN 3
1. Pek. Hidran Umum (9 Unit)
a). Bahan Rp 40,744,784 Rp - Rp 40,744,784 Rp 40,744,784 17.64%
b). Upah Rp 8,422,157 Rp - Rp 8,422,157 Rp 8,422,157 3.65%
Rp 49,166,942 Rp - Rp - Rp 49,166,942 Rp 49,166,942 21.28%
2. Pek Rumah Pompa ( 1 Unit)
a). Bahan Rp 135,303 Rp 135,303 Rp 135,303 0.06%
b). Upah Rp - Rp - Rp - 0.00%
Rp 135,303 Rp - Rp - Rp 135,303 Rp 135,303 0.06%
3. Promkes
a). Promkes " pengelolaan Sampah" Rp 1,085,000 Rp 1,085,000 Rp 1,085,000 0.47%
b). Promkes "saluran Pembuangan air limbah (SPAL) Rp 167,050 Rp 167,050 Rp 167,050 0.07%
c). CLTS Rp 812,750 Rp 812,750 Rp 812,750 0.35%
d). Promkes Sekolah Rp 1,219,000 Rp 1,219,000 Rp 1,219,000 0.53%
Rp 3,283,800 Rp - Rp - Rp 3,283,800 Rp 3,283,800 1.42%
4) Pelatihan Badan Pengelola Sarana (BPS) Rp 4,500,000 Rp 4,500,000 Rp 4,500,000 1.95%

TOTAL TERMIN 3 Rp 57,086,045 Rp - Rp - Rp 57,086,045 Rp 57,086,045 24.71%

TOTAL Rp 203,500,025 Rp 11,000,045 Rp - Rp 192,499,979 Rp 203,500,025 88%

Rp 203,500,000 Rp 11,000,000 Rp - Rp 192,500,000 Rp 203,500,000 88%

APBN
I SARANA SANITASI (SS)
1. Washtafel Sekolah (2 Unit)
a). Bahan Rp 1,149,349 Rp - Rp - Rp - Rp 1,149,349 0.50%
b). Alat Rp - Rp - Rp - Rp - Rp - 0.00%
c). Upah Rp 956,651 Rp - Rp - Rp - Rp 956,651 0.41%
Sub Total 1 Rp 2,106,000 Rp - Rp - Rp - Rp 2,106,000 0.91%
Rp 2,106,000 pembulatan Rp 2,106,000
2. WC Sekolah (1 Unit)
a). Bahan Rp 8,315,092 Rp - Rp - Rp - Rp 8,315,092 3.60%
b). Alat Rp 150,000 Rp - Rp - Rp - Rp 150,000 0.06%
c). Upah Rp 3,928,991 Rp - Rp - Rp - Rp 3,928,991 1.70%
Sub Total 2 Rp 12,394,082 Rp - Rp - Rp - Rp 12,394,082 5.37%
Rp 12,394,082 Pembulatan Rp 12,394,082
Total Sarana Sanitasi (1 + 2) Rp 14,500,000 Rp - Rp - Rp - Rp 14,500,000 6.28%
II PELATIHAN
a) Pelatihan Satlak dan Lembaga Keswadayaan Masyarakat (LKM) Rp 4,500,000 Rp 4,500,000 1.95%

Total Pelatihan Rp 4,500,000 Rp - Rp - Rp - Rp 4,500,000 1.95%


Rp 4,500,000 Rp 4,500,000
III BIAYA OPERASIONAL LKM Rp 8,500,000 Rp 8,500,000 3.68%
Total BOP Rp 8,500,000 Rp - Rp - Rp 8,500,000 3.68%
Grand Total (I + II + III + IV + V) Rp 27,500,000 Rp - Rp - Rp - Rp 27,500,000 11.90%
Rp 27,500,000 Rp - Rp - Rp 192,500,000 Rp 27,500,000
Sisa Dana Rp231,000,000 11,000,000 192,500,000 27,500,000 100.00%
Total Dana Bantuan Rp231,000,000 100.00%
Terbilang Dua Ratus Tiga Puluh Satu Ribu Rupiah
Pekerjaan : SUMUR GALI
Jumlah Unit Bangunan : 3 Unit

No. Sket Perhitungan


Perhitungan Volume dan Material
I Pek.Persiapan
1 Pengukuran Bouplank dan Profil
Panjang Pengukuran Bouplank dan Profil
P = 3.5 + 3.5 + 3.5 + 3.5
3.5 = 14 m2

3.5

II Pek. Lubang Sumur


1 Galian Tanah Volume Galian tanah

1.3 L = ∏ x r2
= 3.14 x 0.65 ^2
= 3.14 x 0.42
= 1.327 m2
10
V = L x Tnggi
= 1.327 x 10.00
= 13.27 m3

III Pek. Mulut Sumur


1 Pek. Pasang Bata Mulut Sumur Volume Pek. Pasangan Bata Mulut Sumur

1.3 Kllng = 2 x ∏ x r
= 2 x 3.14 x 0.65
= 4.082 m2

1 V = Kllng x Tnggi
= 4.082 x 1.00
= 4.082 m3

2 Pek. Plesteran Volume Pek. Plesteran

1.3 Kllng = 2 x ∏ x r
= 2 x 3.14 x 0.65
= 4.082 m2
1
V = Kllng x Tnggi
= 4.082 x 1.00
= 4.082 m2

1 Kllng = 2 x ∏ x r
= 2 x 3.14 x 0.50
= 3.14 m2
1
V = Kllng x Tnggi
= 3.14 x 1.00
= 3.14 m2

Kllng = 2 x ∏ x r
0.15 = 2 x 3.14 x 0.15
= 0.942 m2

Vtot = 4.082 + 3.14 + 0.942


= 8.164 m2

IV Pek. Lantai
1 Pek. Pasangan Bata Pembatas lantai Volume Pek. Pasangan Bata Pembatas Lantai

L = Lbr x Tggi V = L x Jmlh

PERHITUNGAN VOLUME SUMUR GALI Halaman 50 dari 153


Pekerjaan : SUMUR GALI
Jumlah Unit Bangunan : 3 Unit

No. Sket Perhitungan


0.4 = 3 x 0.4 = 1.2 x 4
= 1.2 m2 = 4.8 m2

2 Pek. Pasangan Batu Kosong Volume Pek. Pasangan Batu Kosong

3 L = Lbr x Pjg Ltot = L -


= 3 x 3 = 9 -
= 9 m2 = 7.673 m2
0.2
Vtotl = Ltot x Tinggi
3 = 7.673 x 0.20
= 1.535 m3

PERHITUNGAN VOLUME SUMUR GALI Halaman 51 dari 153


Pekerjaan : SUMUR GALI
Jumlah Unit Bangunan : 3 Unit

No. Sket Perhitungan

3 Pek. Lantai Sumur Volume Pek. Lantai Sumur

3 L = Lbr x Pjg Ltot = L -


= 3 x 3 = 9 -
= 9 m2 = 7.673 m2
0.07
Vtotl = Ltot x Tinggi
3 = 7.673 x 0.07
= 0.537 m3

4 Pek. Plesteran Volume Pek. Plesteran

0.15 L1 = Lbr x Pjg Ltot = L1 + L2


= 0.15 x 12 = 1.8 + 0.72
12 = 1.8 m2 = 4.32 m2

L2 = Lbr x Pjg
0.06
= 0.06 x 12
12 = 0.72 m2

0.15 L3 = Lbr x Pjg


= 0.15 x 12
12 = 1.8 m2

V Pek. Beton
1 Pek. Kolom 25/25 Volume Kolom

0.25 V = Lbr x Pjg x Tggi


= 0.25 x 0.25 x 2.2
= 0.138 m3

2.2 Vtot = V x Jumlah


= 0.138 x 2 Kolom
= 0.275 m3

0.25

VI Pek. SPAL
a Saluran Pembuangan
1 Galian Tanah Volume Galian tanah

9 V = Lbr x Pjg x Tggi


= 0.45 x 9 x 0.3
= 1.215 m3
0.3

0.45
2 Pas. Bata Volume Pas. Bata

L = Lbr x Tggi L2 = Lbr


1 0.4 = 9 x 0.4 = 9
= 3.6 m2 = 1.35
9
L1 = Lbr x Jumlah Ltot = L1
2 0.15 = 3.6 x 2 Kiri & Kanan = 7.2
= 7.2 m2 = 8.55
9

3 Pek. Plesteran Volume Pek. Plesteran

1 0.15 L1 = Lbr x Tggi x Jumlah


= 9 x 0.15 x 3 Kiri,Kanan,Bawah
9 = 4.05 m2

2 0.25 L2 = Lbr x Tggi x Jumlah


PERHITUNGAN VOLUME SUMUR GALI Halaman 52 dari 153
Pekerjaan : SUMUR GALI
Jumlah Unit Bangunan : 3 Unit

No. Sket Perhitungan


= 9 x 0.25 x 2 Sisi
9 = 4.5 m2

3 0.4 L3 = Lbr x Tggi x Jumlah


= 9 x 0.4 x 2 Sisi
= 7.2 m2
9
Ltot = L1 + L2 + L3
= 4.05 + 4.5 + 7.2
= 15.75 m2

b Lubang Pembuangan
1 Galian Tanah Volume Galian tanah

1 V = Lbr x Pjg x Tggi


= 1 x 1 x 1.5
= 1.5 m3
1.5

PERHITUNGAN VOLUME SUMUR GALI Halaman 53 dari 153


Pekerjaan : SUMUR GALI
Jumlah Unit Bangunan : 3 Unit

No. Sket Perhitungan

2 Pek. Pas. Bata Volume Pas. Bata

1 L1 = Lbr x Tggi x Jumlah


1.5 = 0.7 x 1.5 x 2 sisi
= 2.1 m2
0.7
L2 = Lbr x Tggi x Jumlah
2 = 1 x 1.5 x 2 sisi
1.5 = 3 m2

1 Ltot = L1 + L2
= 2.1 + 3
= 5.1 m2

3 Pek. Plat Penutup Lubang Volume Plat Penutup Lubang

1 V = Lbr x Pjg x Tggi


= 1 x 1 x 0.1
0.1 = 0.1 m3
1

4 Pek. Plesteran Volume Plesteran

1 L1 = Lbr x Tggi x Jumlah


1.5 = 0.7 x 1.5 x 4 sisi
= 4.2 m2

0.7 L2 = Lbr x Tggi


2 = 1 x 1
1 = 1 m2

Ltot = L1 + L2
1 = 4.2 + 1
= 5.2 m2

VII Pengecatan
1 Dinding Luar Bibir Sumur Luas Pengecatan

1.3 Kllng = 2 x ∏ x r
= 2 x 3.14 x 0.65
= 4.082 m2

1 V = Kllng x Tnggi Vtot = V -


= 4.082 x 1.00 = 4.082 -
= 4.082 m2 = 3.58 m2

2 Dinding Atas Bibir Sumur Kllng = 2 x ∏ x r


= 2 x 3.14 x 0.15
0.15 = 0.942 m2

Vtot = Kllng - lbr Kolom


= 0.942 - 0.25 - 0.25
= 0.44 m2

3 Kolom 25/25
L = lbr x Tnggi
= 0.25 x 2.20
= 0.55 m2

2.2 Ltot = L x Jmlh


= 0.55 x 6 sisi
= 3.3 m2

0.25
PERHITUNGAN VOLUME SUMUR GALI Halaman 54 dari 153
Pekerjaan : SUMUR GALI
Jumlah Unit Bangunan : 3 Unit

No. Sket Perhitungan

L = lbr x Tnggi
= 0.25 x 1.25
1.25 = 0.313 m2

Ltot = L x Jmlh
= 0.313 x 2 sisi
0.25 = 0.625 m2

Luas Total Plesteran & Acian


= 3.58 + 0.44 + 3.3 + 0.625
= 7.95 m2

PERHITUNGAN VOLUME SUMUR GALI Halaman 55 dari 153


Perhitungan Vol Sat Keterangan

14.00 m1

13.27 m3

32.66
4.08 m3 70
2286
16001

8.16 m2

4.80 m2

PERHITUNGAN VOLUME SUMUR GALI Halaman 56 dari 153


Perhitungan Vol Sat Keterangan
sisi
336
2352

1.53 m3

L mulut sumur
1.33

PERHITUNGAN VOLUME SUMUR GALI Halaman 57 dari 153


Perhitungan Vol Sat Keterangan

0.54 m3

L mulut sumur
1.33

4.32 m2

+ L3
+ 1.8

0.28 m3

1.22 m3

8.55 m2

x Tggi
x 0.15
m2

+ L2
+ 1.35
m2

15.75 m2

PERHITUNGAN VOLUME SUMUR GALI Halaman 58 dari 153


Perhitungan Vol Sat Keterangan

1.50 m3

PERHITUNGAN VOLUME SUMUR GALI Halaman 59 dari 153


Perhitungan Vol Sat Keterangan

5.10 m2

0.10 m3

5.20 m2

7.95 m2

lbr Kolom
0.25 - 0.25

PERHITUNGAN VOLUME SUMUR GALI Halaman 60 dari 153


Perhitungan Vol Sat Keterangan

PERHITUNGAN VOLUME SUMUR GALI Halaman 61 dari 153


PROGRAM PAMSIMAS
(PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT)
ANALISA RAB SUMUR GALI 10 M & SPAL
Propinsi / Kabupaten / Kecamatan / Desa : Gorontalo / Boalemo / Mananggu/ Keramat

NO RAB : 3 Sub Pekerjaan


Pekerjaan/ Kegiatan : Sarana Air Minum Dimensi

NO URAIAN KOEF. VOLUME SAT.

1 2 3 4
I PEKERJAAN PEMASANGAN BOWPLANK 14.00 m1
Kayu 5/7 Klas III 0.01 0.17 m³
Kayu Papan 3/20 Klas III 0.01 0.10 m³
Paku Biasa 2" - 5" 0.02 0.28 kg
Pekerja 0.10 1.40 hok
Tukang Kayu 0.10 1.40 hok
Total
Sub Total I
II PEKERJAAN LUBANG SUMUR
A PEKERJAAN GALIAN TANAH 13.27 m³
Pekerja 0.74 9.75 hok
Total
B PEKERJAAN PASANGAN BUIS BETON 10.00 m
Buis Beton dia 100cm 1.00 10.00 m
Pasir Pasang 0.04 0.43 m³
Semen PC 4.34 43.36 kg
Pekerja 0.64 6.40 hok
Tukang Batu 0.25 2.50 hok
Total
C PEK. PEMASANGAN SARINGAN SUMUR 1.00 ls
Ijuk 1.00 1.00 ls
Kerikil 0.15 0.15 m³
Pasir 0.15 0.15 m³
Pekerja 0.65 0.65 hok
Total
Sub Total II
III PEKERJAAN MULUT SUMUR
A PEKERJAAN PASANGAN BATA MULUT SUMUR 4.08 m³
Batu Bata 70.00 285.74 bh
Pasir Pasang 0.04 0.18 m³
Semen PC 5.75 23.47 kg
Pekerja 0.32 1.31 hok
Tukang Batu 0.10 0.41 hok
Total
B PEKERJAAN PLESTERAN 1 : 4 8.16 m2
Pasir Pasang 0.04 0.34 m³
Semen PC 9.48 77.35 kg
Pekerja 0.32 2.61 hok
Tukang Batu 0.10 0.82 hok
Total
Sub Total III
IV PEKERJAAN LANTAI
A PEKERJAAN PENIMBUNAN DAN PERATAAN TANAH LS
B PEKERJAAN PASANGAN BATA PEMBATAS LANTAI 4.80 m2
Batu Bata 70.00 340.00 bh
Pasir Pasang 0.04 0.21 m³
Semen PC 5.75 27.60 kg
Pekerja 0.32 1.54 hok
Tukang Batu 0.10 0.48 hok
Total
C PEKERJAAN PASANGAN BATU KOSONG 1.53 m³
Batu Kali / Belah 1.15 1.76 m³
Pasir Urug 0.30 0.46 m³
Pekerja 0.43 0.65 hok
Tukang Batu 0.39 0.60 hok
Total
D PEKERJAAN LANTAI SUMUR 0.54 m³
Kerikil beton 0.87 0.47 m³
Pasir Beton 0.52 0.28 m³
Semen PC 175.00 94.00 kg
Pekerja 1.65 0.89 hok
Tukang Batu 0.25 0.13 hok
Total
E PEKERJAAN PLESTERAN 1 : 4 4.32 m2
Pasir Pasang 0.04 0.18 m³
Semen PC 10.94 47.24 kg
Pekerja 0.25 1.08 hok
Tukang Batu 0.20 0.86 hok
Total
Sub Total IV
V PEKERJAAN TIANG BETON 0.28
Besi Beton Polos 105.00 25.88 kg
Kawat Beton Polos 2.25 0.62 kg
Kayu Kls. III Balok 0.15 0.04 m³
Kayu Kls. III papan 0.40 0.11 m³
Kerikil beton 0.78 0.21 m³
Paku Biasa 2.00 0.55 kg
Pasir Beton 0.52 0.14 m³
Semen PC 225.00 61.88 kg
Pekerja 1.10 0.30 hok
Tukang Batu 0.35 0.10 hok
Tukang Besi 1.05 0.29 hok
Tukang Kayu 0.11 0.03 hok
Total
Sub Total V
VI PEKERJAAN SPAL
A PEKERJAAN SALURAN
a GALIAN TANAH 1.22 m³
Pekerja 0.38 0.47 hok
Total
b PEKERJAAN PASANGAN BATA 8.55 m2
Batu Bata 70.00 598.50 bh
Pasir Pasang 0.04 0.37 m³
Semen PC 5.75 49.16 kg
Pekerja 0.32 2.74 hok
Tukang Batu 0.10 0.86 hok
Total
c PEKERJAAN PLESTERAN 1 : 4 15.75 m2
Pasir Pasang 0.04 0.66 m³
Semen PC 10.94 172.23 kg
Pekerja 0.25 3.94 hok
Tukang Batu 0.20 3.15 hok
Total
B PEKERJAAN LUBANG PEMBUANGAN
a PEKERJAAN GALIAN TANAH 1.50 m³
Pekerja 0.74 1.10 hok
Total
b PEKERJAAN PASANGAN BATA 1 : 4 5.10 m2
Batu Bata 70.00 357.00 bh
Pasir Pasang 0.04 0.22 m³
Semen PC 5.75 29.33 kg
Pekerja 0.32 1.63 hok
Tukang Batu 0.10 0.51 hok
Total
c PEKERJAAN PLAT PENUTUP LUBANG 0.10 m³
Besi Beton Polos 100.00 10.00 kg
Kawat Beton Polos 2.25 0.23 kg
Kayu Kls. III Balok 0.12 0.01 m³
Kayu Kls. III papan 0.32 0.03 m³
Kerikil beton 0.78 0.08 m³
Paku Biasa 3.20 0.32 kg
Pasir Beton 0.52 0.05 m³
Semen PC 225.00 22.50 kg
Pekerja 1.10 0.11 hok
Tukang Batu 0.35 0.04 hok
Tukang Besi 0.12 0.01 hok
Tukang Kayu 0.11 0.01 hok
Total
d PEKERJAAN PLESTERAN 1 : 4 5.20 m2
Pasir Pasang 0.04 0.22 m³
Semen PC 10.94 56.86 kg
Pekerja 0.25 1.30 hok
Tukang Batu 0.20 1.04 hok
Total
Sub Total VI
VII PEKERJAAN FINISHING 7.95
Cat Dasar 0.10 0.79 kg
Cat Tembok 0.26 2.07 kg
Plamur Tembok 0.10 0.79 kg
Pekerja 0.02 0.16 hok
Tukang Cat 0.06 0.50 hok
Total
Sub Total VII
VIII ASESORIS 1.00
Timba 2.00 2.00 bh
Tali Timba 24.00 24.00 m
Kerekan 1.00 1.00 bh
Besi Penyangga 1.00 1.00 m
Total
Sub Total VIII
IX ALAT 1.00
Cangkul 1.00 1.00 bh
Ember 2.00 2.00 bh
Kuas 1.00 1.00 bh
Linggis 1.00 1.00 bh
Sekop 1.00 1.00 bh
Tali 12.00 12.00 m
Total
Sub Total IX
Jumlah Total
Total 3 Unit
PROGRAM PAMSIMAS
R MINUM & SANITASI BERBASIS MASYARAKAT)
LISA RAB SUMUR GALI 10 M & SPAL
matan / Desa : Gorontalo / Boalemo / Mananggu/ Keramat

Sub Pekerjaan : Sumur Gali


Dimensi : 3 Unit

BIAYA (Rp)
HARGA SATUAN
(Rp) TOTAL APBD
5 6=2x5

Rp 1,750,000 Rp 294,000
###
Rp 1,750,000 Rp 171,500
###
Rp 14,000 Rp 3,920
###
Rp 45,000 Rp 63,000
###
Rp 65,000 Rp 91,000
###
Total Rp 623,420
Sub Total I Rp 623,420
###

Rp 45,000 Rp 438,789
###
Total Rp 438,789

Rp 350,000 Rp 3,500,000
###
Rp 85,000 Rp 36,550
###
Rp 1,400 Rp 60,704
###
Rp 45,000 Rp 288,000
###
Rp 65,000 Rp 162,500
###
Total Rp 4,047,754

Rp 15,000 Rp 15,000
###
Rp 115,000 Rp 17,250
###
Rp 85,000 Rp 12,750
###
Rp 45,000 Rp 29,250
###
Total Rp 74,250
Sub Total II Rp 4,560,793
###

Rp 500 Rp 142,870
###
Rp 85,000 Rp 14,920
###
Rp 1,400 Rp 32,860
###
Rp 45,000 Rp 58,781
###
Rp 65,000 Rp 26,533
###
Total Rp 275,964

Rp 85,000 Rp 29,145
###
Rp 1,400 Rp 108,295
###
Rp 45,000 Rp 117,562
###
Rp 65,000 Rp 53,066
###
Total Rp 308,069
Sub Total III Rp 584,032
###

Rp 500 Rp 170,000
###
Rp 85,000 Rp 17,544
###
Rp 1,400 Rp 38,640
###
Rp 45,000 Rp 69,120
###
Rp 65,000 Rp 31,200
###
Total Rp 326,504

Rp 100,000 Rp 176,487
###
Rp 85,000 Rp 39,134
###
Rp 45,000 Rp 29,351
###
Rp 65,000 Rp 38,904
###
Total Rp 283,876

Rp 115,000 Rp 53,740
###
Rp 85,000 Rp 23,741
###
Rp 1,400 Rp 131,598
###
Rp 45,000 Rp 39,882
###
Rp 65,000 Rp 8,728
###
Total Rp 257,690

Rp 85,000 Rp 15,422
###
Rp 1,400 Rp 66,135
###
Rp 45,000 Rp 48,600
###
Rp 65,000 Rp 56,160
###
Total Rp 186,317
Sub Total IV Rp 1,054,387
###
Rp 9,000 Rp 232,875
###
Rp 20,000 Rp 12,375
###
Rp 1,750,000 Rp 72,188
###
Rp 1,750,000 Rp 192,500
###
Rp 115,000 Rp 24,668
###
Rp 14,000 Rp 7,700
###
Rp 85,000 Rp 12,155
###
Rp 1,400 Rp 86,625
###
Rp 45,000 Rp 13,613
###
Rp 65,000 Rp 6,256
###
Rp 65,000 Rp 18,769
###
Rp 65,000 Rp 1,966
###
Total Rp 681,689
Sub Total V Rp 681,689
###

Rp 45,000 Rp 20,995
###
Total Rp 20,995

Rp 500 Rp 299,250
###
Rp 85,000 Rp 31,250
###
Rp 1,400 Rp 68,828
###
Rp 45,000 Rp 123,120
###
Rp 65,000 Rp 55,575
###
Total Rp 578,023

Rp 85,000 Rp 56,228
###
Rp 1,400 Rp 241,117
###
Rp 45,000 Rp 177,188
###
Rp 65,000 Rp 204,750
###
Total Rp 679,282

Rp 45,000 Rp 49,613
###
Total Rp 49,613

Rp 500 Rp 178,500
###
Rp 85,000 Rp 18,641
###
Rp 1,400 Rp 41,055
###
Rp 45,000 Rp 73,440
###
Rp 65,000 Rp 33,150
###
Total Rp 344,786

Rp 9,000 Rp 90,000
###
Rp 20,000 Rp 4,500
###
Rp 1,750,000 Rp 21,000
###
Rp 1,750,000 Rp 56,000
###
Rp 115,000 Rp 8,970
###
Rp 14,000 Rp 4,480
###
Rp 85,000 Rp 4,420
###
Rp 1,400 Rp 31,500
###
Rp 45,000 Rp 4,950
###
Rp 65,000 Rp 2,275
###
Rp 65,000 Rp 780
###
Rp 65,000 Rp 715
###
Total Rp 229,590

Rp 85,000 Rp 18,564
###
Rp 1,400 Rp 79,607
###
Rp 45,000 Rp 58,500
###
Rp 65,000 Rp 67,600
###
Total Rp 224,271
Sub Total VI Rp 2,126,559
###

Rp 5,000 Rp 3,975
###
Rp 16,000 Rp 33,068
###
Rp 7,600 Rp 6,041
###
Rp 45,000 Rp 7,154
###
Rp 65,000 Rp 32,551
###
Total Rp 82,789
Sub Total VII Rp 82,789
###

Rp 7,000 Rp 14,000
###
Rp 4,000 Rp 96,000
###
Rp 37,500 Rp 37,500
###
Rp 100,000 Rp 100,000
###
Total Rp 247,500
Sub Total VIII Rp 247,500
###

Rp 50,000 Rp 50,000
###
Rp 15,000 Rp 30,000
###
Rp 15,000 Rp 15,000
###
Rp 35,000 Rp 35,000
###
Rp 50,000 Rp 50,000
###
Rp 4,000 Rp 48,000
###
Total Rp 228,000
Sub Total IX Rp 228,000
###
Jumlah Total Rp 10,189,169
###
Total 3 Unit Rp 30,567,507
RENCANA ANGGARAN BIAYA

NO RAB : 3
Pekerjaan/ Kegiatan : Sarana Air Minum

VOLUME

SAT
NO URAIAN KONTRIBUSI MASYARAKAT HARGA SATUAN
TOTAL APBN APBD
IN CASH IN KIND
1 2 = 3+4+5+6 3 4 5 6 7 8
I BAHAN
Batu Bata 1,581.24 - - 1,581.24 - bh Rp 500
Batu Kali / Belah 1.76 - - 1.76 - m³ Rp 100,000
Besi Beton 35.88 35.88 - - - kg Rp 9,000
Besi Penyangga 1.00 - - 1.00 - m Rp 100,000
Buis Beton 10.00 - - 10.00 - m Rp 350,000
Cat Dasar 0.79 - - 0.79 - kg Rp 5,000
Cat Tembok 2.07 2.07 - - - kg Rp 16,000
Ijuk 1.00 - - 1.00 - m² Rp 15,000
Kawat Beton (Bendrat) 0.84 - - 0.84 - kg Rp 20,000
Kayu Bekisting 0.46 - - 0.46 - m³ Rp 1,750,000
Kerekan/katrol 1.00 - - 1.00 - bh Rp 37,500
Kerikil 0.91 - - 0.91 - m³ Rp 115,000
Pasir 3.89 - - 3.89 - m³ Rp 85,000
Paku 1.15 - - 1.15 - kg Rp 14,000
Plamur 0.79 - - 0.79 - kg Rp 7,600
Semen 704.97 704.97 - - - kg Rp 1,400
Tali Timba 24.00 - - 24.00 - m Rp 4,000
Timba 2.00 - - 2.00 - bh Rp 7,000
sub total 1
II ALAT
Cangkul 1.00 - 1.00 - - bh Rp 50,000
Ember 2.00 - 2.00 - - bh Rp 15,000
Kuas 1.00 - - 1.00 - bh Rp 15,000
Linggis 1.00 - 1.00 - - bh Rp 35,000
Sekop 1.00 - 1.00 - - bh Rp 50,000
Tali 12.00 - - 12.00 - m Rp 4,000
sub total 2
III UPAH
Pekerja 38.02 - - 38.02 - hok Rp 45,000
Tukang 13.73 - - 13.73 - hok Rp 65,000
sub total 3
TOTAL
TOTAL UNIT : 3
RENCANA ANGGARAN BIAYA

Sub Pekerjaan/ Kegiatan : Sumur Gali Dia. 1 m


Dimensi : 4 Unit

BIAYA (Rp)
KONTRIBUSI MASYARAKAT
TOTAL APBN APBD
IN CASH IN KIND
9 = 10+11+12+13 10 = 3x8 11 = 4x8 12 = 5x8 13 = 6x8

Rp 790,620 Rp - Rp - Rp 790,620 Rp -
Rp 176,487 Rp - Rp - Rp 176,487 Rp -
Rp 322,875 Rp 322,875 Rp - Rp - Rp -
Rp 100,000 Rp - Rp - Rp 100,000 Rp -
Rp 3,500,000 Rp - Rp - Rp 3,500,000 Rp -
Rp 3,975 Rp - Rp - Rp 3,975 Rp -
Rp 33,068 Rp 33,068 Rp - Rp - Rp -
Rp 15,000 Rp - Rp - Rp 15,000 Rp -
Rp 16,875 Rp - Rp - Rp 16,875 Rp -
Rp 807,188 Rp - Rp - Rp 807,188 Rp -
Rp 37,500 Rp - Rp - Rp 37,500 Rp -
Rp 104,628 Rp - Rp - Rp 104,628 Rp -
Rp 330,464 Rp - Rp - Rp 330,464 Rp -
Rp 16,100 Rp - Rp - Rp 16,100 Rp -
Rp 6,041 Rp - Rp - Rp 6,041 Rp -
Rp 986,963 Rp 986,963 Rp - Rp - Rp -
Rp 96,000 Rp - Rp - Rp 96,000 Rp -
Rp 14,000 Rp - Rp - Rp 14,000 Rp -
Rp 7,357,784 Rp 1,342,906 Rp - Rp 6,014,877 Rp -

Rp 50,000 Rp - Rp 50,000 Rp - Rp -
Rp 30,000 Rp - Rp 30,000 Rp - Rp -
Rp 15,000 Rp - Rp - Rp 15,000 Rp -
Rp 35,000 Rp - Rp 35,000 Rp - Rp -
Rp 50,000 Rp - Rp 50,000 Rp - Rp -
Rp 48,000 Rp - Rp - Rp 48,000 Rp -
Rp 228,000 Rp - Rp 165,000 Rp 63,000 Rp -

Rp 1,710,906 Rp - Rp - Rp 1,710,906 Rp -
Rp 892,479 Rp - Rp - Rp 892,479 Rp -
Rp 2,603,385 Rp - Rp - Rp 2,603,385 Rp -
Rp 10,189,169 Rp 1,342,906 Rp 165,000 Rp 8,681,263 Rp -
Rp 30,567,507 Rp 4,028,719 Rp 495,000 Rp 26,043,788 Rp -
RENCANA PENGGUNAAN DANA TERMIN I (APBN + IN CASH + IN KIND)

Kegiatan : Sarana Air Minum

VOLUME
NO URAIAN KEBUTU Real. s/d Pengajuan Jumlah Unit / Sat.
HAN Tahap Lalu Sekarang Kumulatif
A Sumur Gali
I APBN
a Bahan
Batu Bata 1,581.24 1,581.24 1,581.24 bh
Batu Kali / Belah 1.76 1.76 1.76 m³
Besi Penyangga 1.00 1.00 1.00 m
Buis Beton 10.00 10.00 10.00 m
Cat Dasar 0.79 0.79 0.79 kg
Ijuk 1.000 1.00 1.00 m²
Kawat Beton (Bendrat) 0.844 0.84 0.84 kg
Kayu Bekisting 0.461 0.46 0.46 m³
Kerekan/katrol 1.000 1.00 1.00 bh
Kerikil 0.910 0.91 0.91 m³
Pasir 3.888 3.89 3.89 m³
Paku 1.150 1.15 1.15 kg
Plamur 0.795 0.79 0.79 kg
Tali Timba 24.00 24.00 24.00 m
Timba 2.00 2.00 2.00 bh
Sub Total I
b Alat
Kuas 1 - 1 1 bh
Tali 12 - 12 12 m
Sub Total II
c Upah
Pekerja 38.02 - 0.00 Hok
Tukang 13.73 0.00 Hok
Sub Total III
Total Dana APBN (A + a + b + c)
II IN CASH
a Bahan
Besi Beton 35.88 35.88 35.88 kg
Cat Tembok 2.07 2.07 2.07 kg
Semen 704.974 704.97 704.97 kg
Total Dana IN-CASH
III IN KIND
a Alat
Cangkul 1.0 1.0 1.00 bh
Ember 2.0 2.0 2.00 bh
Linggis 1.0 1.0 1.00 bh
Sekop 1.0 1.0 1.00 bh
Total Dana In Kind
Total Dana APBN + In-Cash
Total Dana APBN + In-Cash + Inkind
Total Dana APBN + In-Cash + Inkind (Pembulatan) x 2 unit
IN CASH + IN KIND)

RPD Ke : 1

Harga Satuan
Jumlah (Rp)
(Rp)

Rp 500 Rp 790,620
Rp 100,000 Rp 176,487
Rp 100,000 Rp 100,000
Rp 350,000 Rp 3,500,000
Rp 5,000 Rp 3,975
Rp 15,000 Rp 15,000
Rp 20,000 Rp 16,875
Rp 1,750,000 Rp 807,188
Rp 37,500 Rp 37,500
Rp 115,000 Rp 104,628
Rp 85,000 Rp 330,464
Rp 14,000 Rp 16,100
Rp 7,600 Rp 6,041
Rp 4,000 Rp 96,000
Rp 7,000 Rp 14,000
Rp 6,014,877.37

Rp 15,000.00 Rp 15,000.00
Rp 4,000.00 Rp 48,000.00
Rp 63,000.00

Rp 45,000.00 Rp -
Rp 65,000.00 Rp -
Rp -
Rp 6,077,900.00

Rp 9,000 Rp 322,875.00
Rp 16,000 Rp 33,067.84
Rp 1,400 Rp 986,963.44
Rp 1,342,906.28

Rp 50,000 Rp 50,000.00
Rp 15,000 Rp 30,000.00
Rp 35,000 Rp 35,000.00
Rp 50,000 Rp 50,000.00
Rp 165,000.00
Rp 14,841,600.00
Rp 15,006,600.00
Rp 15,006,600.00
RENCANA PENGGUNAAN DANA TERMIN I (APBN + IN CASH + IN KIND)

Kegiatan : Sarana Air Minum RPD Ke : 2

VOLUME
Real. s/d Pengajua Harga Satuan
NO URAIAN KEBUTU Jumlah Unit / Sat.
Tahap n (Rp)
HAN Kumulatif
Lalu Sekarang
A Sumur Gali
I APBN
a Bahan
Batu Bata 1,581.24 1,581.24 - 1,581.24 bh Rp 500
Batu Kali / Belah 1.76 1.76 - 1.76 m³ Rp 100,000
Besi Penyangga 1.00 1.00 - 1.00 m Rp 100,000
Buis Beton 10.00 10.00 - 10.00 m Rp 350,000
Cat Dasar 0.79 0.79 - 0.79 kg Rp 5,000
Ijuk 1.000 1.00 - 1.00 m² Rp 15,000
Kawat Beton (Bendrat) 0.844 0.84 - 0.84 kg Rp 20,000
Kayu Bekisting 0.461 0.46 - 0.46 m³ Rp 1,750,000
Kerekan/katrol 1.000 1.00 - 1.00 bh Rp 37,500
Kerikil 0.910 0.91 - 0.91 m³ Rp 115,000
Pasir 3.888 3.89 - 3.89 m³ Rp 85,000
Paku 1.150 1.15 - 1.15 kg Rp 14,000
Plamur 0.795 0.79 - 0.79 kg Rp 7,600
Tali Timba 24.00 24.00 - 24.00 m Rp 4,000
Timba 2.00 2.00 - 2.00 bh Rp 7,000
Sub Total I
b Alat
Kuas 1 1 - 1 bh Rp 15,000.00
Tali 12 12 - 12 m Rp 4,000.00
Sub Total II
c Upah
Pekerja 38.02 - 38.02 38.02 Hok Rp 45,000.00
Tukang 13.73 13.73 13.73 Hok Rp 65,000.00
Sub Total III
Total Dana APBN (A + a + b + c)
II IN CASH
a Bahan
Besi Beton 35.88 35.88 - 35.88 kg Rp 9,000
Cat Tembok 2.07 2.07 - 2.07 kg Rp 16,000
Semen 704.974 704.97 - 704.97 kg Rp 1,400
Total Dana IN-CASH
III IN KIND
a Alat
Cangkul 1.0 1.0 - 1.00 bh Rp 50,000
Ember 2.0 2.0 - 2.00 bh Rp 15,000
Linggis 1.0 1.0 - 1.00 bh Rp 35,000
Sekop 1.0 1.0 - 1.00 bh Rp 50,000
Total Dana In Kind
Total Dana APBN + In-Cash
Total Dana APBN + In-Cash + Inkind
Total Dana APBN + In-Cash + Inkind (Pembulatan) x 2 unit
N KIND)

Jumlah (Rp)

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -

Rp 1,710,906.49
Rp 892,478.73
Rp 2,603,385.21
Rp 2,603,400.00

Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp 5,206,800.00
Rp 5,206,800.00
Rp 5,206,800.00
RENCANA PENGGUNAAN DANA TERMIN I (APBN + IN CASH + IN KIND)

Kegiatan : Sarana Air Minum RPD Ke : 3

VOLUME
NO URAIAN Real. s/d Pengajua
KEBUTU Jumlah Unit / Sat. Harga Satuan (Rp)
Tahap n
HAN Kumulatif
Lalu Sekarang
A Sumur Gali
I APBN
a Bahan
Batu Bata 1,581.24 1,581.24 1,581.24 bh Rp 500
Batu Kali / Belah 1.76 1.76 1.76 m³ Rp 100,000
Besi Penyangga 1.00 1.00 1.00 m Rp 100,000
Buis Beton 10.00 10.00 10.00 m Rp 350,000
Cat Dasar 0.79 0.79 0.79 kg Rp 5,000
Ijuk 1.000 1.00 1.00 m² Rp 15,000
Kawat Beton (Bendrat) 0.844 0.84 0.84 kg Rp 20,000
Kayu Bekisting 0.461 0.46 0.46 m³ Rp 1,750,000
Kerekan/katrol 1.000 1.00 1.00 bh Rp 37,500
Kerikil 0.910 0.91 0.91 m³ Rp 115,000
Pasir 3.888 3.89 3.89 m³ Rp 85,000
Paku 1.150 1.15 1.15 kg Rp 14,000
Plamur 0.795 0.79 0.79 kg Rp 7,600
Tali Timba 24.00 24.00 24.00 m Rp 4,000
Timba 2.00 2.00 2.00 bh Rp 7,000
Sub Total I
b Alat
Kuas 1 - 1 1 bh Rp 15,000.00
Tali 12 - 12 12 m Rp 4,000.00
Sub Total II
c Upah
Pekerja 38.02 - 38.02 38.02 Hok Rp 45,000.00
Tukang 13.73 13.73 13.73 Hok Rp 65,000.00
Sub Total III
Total Dana APBN (A + a + b + c)
II IN CASH
a Bahan
Besi Beton 35.88 35.88 35.88 kg Rp 9,000
Cat Tembok 2.07 2.07 2.07 kg Rp 16,000
Semen 704.974 704.97 704.97 kg Rp 1,400
Total Dana IN-CASH
III IN KIND
a Alat
Cangkul 1.0 1.0 1.00 bh Rp 50,000
Ember 2.0 2.0 2.00 bh Rp 15,000
Linggis 1.0 1.0 1.00 bh Rp 35,000
Sekop 1.0 1.0 1.00 bh Rp 50,000
Total Dana In Kind
Total Dana APBN + In-Cash
Total Dana APBN + In-Cash + Inkind
Total Dana APBN + In-Cash + Inkind (Pembulatan) x 1 unit
IN KIND)

Jumlah (Rp)

Rp 790,620
Rp 176,487
Rp 100,000
Rp 3,500,000
Rp 3,975
Rp 15,000
Rp 16,875
Rp 807,188
Rp 37,500
Rp 104,628
Rp 330,464
Rp 16,100
Rp 6,041
Rp 96,000
Rp 14,000
Rp 6,014,877.37

Rp 15,000.00
Rp 48,000.00
Rp 63,000.00

Rp 1,710,906.49
Rp 892,478.73
Rp 2,603,385.21
Rp 8,681,300.00

Rp 322,875.00
Rp 33,067.84
Rp 986,963.44
Rp 1,342,906.28

Rp 50,000.00
Rp 30,000.00
Rp 35,000.00
Rp 50,000.00
Rp 165,000.00
Rp 10,024,200.00
Rp 10,189,200.00
Rp 10,189,200.00
ANALISA & RAB WASHTAFEL

NO RAB : 4 Sub.Pek./Kegiatan : Pemasangan Washtafel


Pekerjaan/ Kegiatan : Sarana Sanitasi Dimensi/Unit : 2 Unit

NO URAIAN Koef. Volume Satuan Harga Satuan (Rp)

1 2 3 4 5
I PEKERJAAN GALIAN TANAH
Galian Tanah 0.90 m3
Pekerja 0.384 0.35 hok 45,000.00
Total
Sub Total I
II PEKERJAAN PEMASANGAN PIPA
1 Pemasangan Pipa 3/4" 28.00 m
Pipa PVC AW 3/4" 1.10 30.80 m Rp 8,750
Perlengkapan 0.35 9.80 ls Rp 1,750
Tukang Batu 0.06 1.68 HOK Rp 65,000
Pekerja 0.35 9.80 HOK Rp 45,000
Total
Sub Total II
III PEK. PAS. WASHTAFEL 2.00 ls
Washtafel 1.00 2.00 bh Rp 390,000
Perlengkapan 0.11 0.23 m Rp 58,500
Semen PC 6.00 12.00 kg Rp 1,400
Pasir Pasang 0.01 0.02 m³ Rp 85,000
Tukang Batu 2.00 4.00 hok Rp 65,000
Pekerja 1.30 2.60 hok Rp 45,000
Total
Sub Total III
IV PEK. PAS.STOP KRAN 1/2" 2.00 bh
Kran Air 1.00 2.00 bh Rp 25,389
Seal Tape 0.03 0.05 bh Rp 4,000
Tukang Batu 0.10 0.20 hok Rp 65,000
Pekerja 0.01 0.02 hok Rp 45,000
Total
Sub Total IV
Jumlah Total
NALISA & RAB WASHTAFEL

Sub.Pek./Kegiatan : Pemasangan Washtafel

Biaya (Rp)

Total

6=2x5

Rp 15,551
Rp 15,551
Rp 15,551

Rp 269,500
Rp 17,150
Rp 109,200
Rp 441,000
Rp 836,850
Rp 836,850

Rp 780,000
Rp 13,221
Rp 16,800
Rp 1,700
Rp 260,000
Rp 117,000
Rp 1,188,721
Rp 1,188,721

Rp 50,778
Rp 200
Rp 13,000
Rp 900
Rp 64,878
Rp 64,878
Rp 2,106,000
RENCANA ANGGARAN BIAYA

NO RAB : 4
Pekerjaan/ Kegiatan : Sarana Sanitasi

Volume Biaya (Rp)


Konstribusi Masyarakat Kontribusi
NO URAIAN Satuan Harga Satuan (Rp)
Total APBN APBD Total
inCash inKind inCash
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8
1 BAHAN
Pipa PVC Dia. 3/4 30.80 - - - 30.80 m Rp 8,750 Rp 269,500 Rp -
Perlengkapan 9.80 - - - 9.80 ls Rp 1,750 Rp 17,150 Rp -
Washtafel 2.00 - - - 2.00 bh Rp 390,000 Rp 780,000 Rp -
Perlengkapan 0.226 - - - 0.23 ls Rp 58,500 Rp 13,221 Rp -
Seal Tape 0.05 - - - 0.05 bh Rp 4,000 Rp 200 Rp -
Semen PC 12.00 - - - 12.00 kg Rp 1,400 Rp 16,800 Rp -
Pasir Pasang 0.02 - - - 0.02 m³ Rp 85,000 Rp 1,700 Rp -
Kran 1/2" 2.00 - - - 2.00 bh Rp 25,389 Rp 50,778 Rp -
Sub Total I Rp 1,149,349 Rp -
2 ALAT
Alat Bantu - - - - - - Rp - Rp -
Sub Total II Rp - Rp -
3 UPAH
Tukang 5.88 - - - 5.88 hok Rp 65,000 Rp 382,200 Rp -
Pekerja 12.77 - - - 12.77 hok Rp 45,000 Rp 574,451 Rp -
Sub Total III Rp 956,651 Rp -
Jumlah Total Rp 2,106,000 Rp -

Rp -
NCANA ANGGARAN BIAYA

Sub Pekerjaan : Pemasangan Washtafel


Ukuran / Dimensi : 2 Unit

Biaya (Rp)
Kontribusi
APBN APBD
Inkind
11=4x8 12=5x8 13=6x8

Rp - Rp - Rp 269,500.00
Rp - Rp - Rp 17,150.00
Rp - Rp - Rp 780,000.00
Rp - Rp - Rp 13,221.00
Rp - Rp - Rp 200.00
Rp - Rp - Rp 16,800.00
Rp - Rp - Rp 1,700.00
Rp - Rp - Rp 50,778.00
Rp - Rp - Rp 1,149,349

Rp - Rp - Rp -
Rp - Rp - Rp -

Rp - Rp - Rp 382,200
Rp - Rp - Rp 574,451
Rp - Rp - Rp 956,651
Rp - Rp - Rp 2,106,000
RENCANA PENGGUNAAN DANA TERMIN I (APBD)

Kegiatan : Sarana Sanitasi Sekolah RPD Ke : 2

VOLUME
NO URAIAN Real. s/d Pengajua
KEBUTU Jumlah Unit / Sat. Harga Satuan (Rp)
Tahap n
HAN Kumulatif
Lalu Sekarang
A Wastafel
I APBN
a Bahan
Pipa PVC Dia. 3/4 30.80 30.80 30.80 m Rp 8,750
Perlengkapan 9.80 9.80 9.80 ls Rp 1,750
Washtafel 2.00 2.00 2.00 bh Rp 390,000
Perlengkapan 0.23 0.23 0.23 ls Rp 58,500
Seal Tape 0.05 0.05 0.05 bh Rp 4,000
Semen PC 12.00 12.00 12.00 kg Rp 1,400
Pasir Pasang 0.02 0.02 0.02 m³ Rp 85,000
Kran 1/2" 2.00 2.00 2.00 bh Rp 25,389
Sub Total I
b Upah
Pekerja 12.77 - 12.77 12.77 Hok Rp 45,000.00
Tukang 5.88 5.88 5.88 Hok Rp 65,000.00
Sub Total III
Total Dana APBN + In-Cash
Jumlah (Rp)

Rp 269,500
Rp 17,150
Rp 780,000
Rp 13,221
Rp 200
Rp 16,800
Rp 1,700
Rp 50,778
Rp 1,149,349.00

Rp 574,450.79
Rp 382,200.00
Rp 956,650.79
Rp 2,106,000.00
Pekerjaan : WC 2 Pintu
Jumlah Unit Bangunan : 1 Unit

No. Sket Perhitungan


Perhitungan Volume dan Material
I Pek.Persiapan
1 Pengukuran Bouplank dan Profil
Panjang Pengukuran Bouplank dan Profil
P = 2 + 2 + 3.5 + 3.5
2
= 11 m 2

3.5

II Pek.Tanah
1 Galian Tanah Volume Galian tanah
0.6
V = 1 x (a+b) x Tggi V = 0.25
2 = 0.25
0.5 = 0.4 + 0.6 x 0.5 = 2.625
2
= 1 x 0.5
0.4 2
= 0.5 x 0.5
= 0.25 m2

2 Urugan pasir Bawah Pondasi Volume Urugan Pasir Bawah Pondasi

V = Lbr x Pjg x Tggi


0.05 = 0.4 x 10.5 x 0.05
6 = 0.21 m3
0.4

3 Pekerjaan Timbrisan Batu Kosong Volume Timbrisan Batu Kosong

V = Lbr x Pjg x Tggi


= 0.4 x 10.5 x 0.1
= 0.42 m3
0.1

0.4

4 Pek. Pondasi Batu Kali


0.2 Volume Pas. Pondasi Batu Kali
L pondasi = 1 x (a+b) x Tggi V = 0.15
2 = 0.15
0.5 = 0.2 + 0.4 x 0.5 = 1.575
2
= 0.6 x 0.5
0.4 2
= 0.3 x 0.5
= 0.15 m2

5 Pek. Pasangan Bata 1 : 2 teras Volume Pas. Bata Teras

L = 0.35 x 4.2
= 0.35 x 4.2
0.35 = 1.47 m2

4.2

6 Pek. Urugan Tanah kembali Volume Urugan Tanah Kembali

V1 = 1 x V Galian Tanah
4
= 0 x 2.63
4
= 2.625

PERHITUNGAN VOLUME WC 2 PINTU Halaman 86 dari 153


Pekerjaan : WC 2 Pintu
Jumlah Unit Bangunan : 1 Unit

No. Sket Perhitungan


4
= 0.656 m3

1.5 1.5 V2 = 3 x 0.15 x 0.60


= 0.27 m3
= 0.27 m3
1.5

Vtot = V1 + V2
0.6 = 0.656 + 0.27
= 0.926 m3

III Pek. Beton


1 Pek Sloof Volume Pek. Sloof

V = Lbr x Pjg x Tggi


= 0.15 x 10.5 x 0.15
10.5 = 0.236 m3
0.15

0.15

2 Pek. Kolom 15/15 Volume Kolom

0.15 V = Lbr x Pjg x Tggi


= 0.15 x 0.15 x 2
= 0.045 m3
2
Vtot = V x Jumlah
= 0.045 x 6 Kolom
= 0.27 m3

0.15

PERHITUNGAN VOLUME WC 2 PINTU Halaman 87 dari 153


Pekerjaan : WC 2 Pintu
Jumlah Unit Bangunan : 1 Unit

No. Sket Perhitungan

3 Pek. Ring Balok Volume Pek. Sloof

V = Lbr x Pjg x Tggi


= 0.15 x 10.5 x 0.15
10.5 = 0.236 m3
0.15

0.15

IV Pek. Pasangan Dinding


1 Pek. Pasangan Dinding 1 : 4 Volume Pek. Pasangan Dinding 1 : 4

L1 = Lbr x Tggi
= 1.35 x 2
= 2.7 m2
2
L1 = L x Jumlah
= 2.7 x 7 Sisi
= 18.9 m2

1.35 L2 = 1 x A x Tggi L2 = 0.338


2 = 0.338
= 1 x 1.35 x 0.5 = 0.675
2
0.5 = 1.35 x 0.5
2 L = L1
= 0.675 x 0.5 = 18.9
= 0.338 m2 = 19.58
1.35
Ltot = L - L Kusen - L Jendela
= 19.58 - 2.17 - 0.3
= 17.11 m2

2 Plesteran & Acian Luas Plesteran Campuran 1 : 4


a Dinding Luar

` L1 = Lbr x Tggi L1 = 3.3 x Sisi


= 1.65 x 2 = 3.3 x 2
2
= 3.3 m2 = 6.6 m2

1.65 Ltot = L1 - L Jendela


= 6.6 - 0.3
= 6.30 m2

L2 = Lbr x Tggi L2 = 6.3 x Sisi


= 3.15 x 2 = 6.3 x 2
2
= 6.3 m2 = 12.6 m2

3.15 Ltot = L1 - L Kusen


= 12.6 - 2.17
= 9.93 m2

0.5 L2 = 1 x A x Tggi L2 = 0.338


2 = 0.338
= 1 x 1.35 x 0.5 = 0.675
1.35 2
= 1.35 x 0.5
2
= 0.675 x 0.5
= 0.338 m2

b Dinding Dalam
L3 = Lbr x Tggi L3 = 2.7 x Sisi
= 1.35 x 2 = 2.7 x 8
2
= 2.7 m2 = 21.6 m2

1.35 Ltot = L3 - L Kusen - L Jendela


= 21.6 - 2.17 - 0.3

PERHITUNGAN VOLUME WC 2 PINTU Halaman 88 dari 153


Pekerjaan : WC 2 Pintu
Jumlah Unit Bangunan : 1 Unit

No. Sket Perhitungan


= 19.13 m 2

Luas Total Plesteran & Acian


= L2 + L2 + L3
= 9.93 + 0.675 + 19.13
= 29.74 m2

V Pek. Atap Volume Pek. Atap


Pek. Kuda-Kuda
6/10 6/10 6/10 Untuk Kuda-Kuda setengah
6/10 kuda-kuda ABC diketahui :
0.55
< A = 300
AB = 0.75 m Ukuran 6/12
1.5 cos 30 0
= AB Balok Tarik = 2 x
AC Kaki Kuda-Kuda = 2 x
C cos 300 = 0.75 Balok Makelar = 1 x

D AC Balok Sokong = 2 x
AC = 0.75
cos 300 3 Buah Kuda-Kuda
B A AC = 0.866 m 3 x 4.65 = 13.94 m
0.75 BD = 0.5 AC
BD = 0.433 m

< A = 300 Ukuran 6/12


B A AB = 0.60 m Balok Tarik = 6 x 0.693
0.6 cos 300 = AB = 4.16
AC
cos 300 = 0.60 Panjang Total Kuda-kuda
AC = 13.9 + 4.16
AC = 0.60 = 18.10 m
cos 300
AC = 0.693 m

V = Lbr x Pjg x Tggi


= 0.06 x 18.10 x 0.1
= 0.109 m3

10% Kayu Hilang = 10% x 0.11 V = 0.109


= 0.011 = 0.12

PERHITUNGAN VOLUME WC 2 PINTU Halaman 89 dari 153


Pekerjaan : WC 2 Pintu
Jumlah Unit Bangunan : 1 Unit

No. Sket Perhitungan

Pek. Pemasangan seng gelombang Volume Pek. Pemasangan Seng Gelombang

L1 = Pjng x Lbr
3.118 = 4.2 x 3.12
= 13.1 m2

4.2

VI Pek. Lantai
1 Pek. Urugan Tanah Bawah Lantai Volume Pek. Urugan Tanah Bawah Lantai

V = Lbr x Pjg x Tggi


2.7 = 1.35 x 2.7 x 0.15
= 0.547 m3

0.15

1.35

2 Pek. Urugan Pasir Bawah Lantai Volume Pek. Urugan Pasir Bawah Lantai

V = Lbr x Pjg x Tggi


2.7 = 2.7 x 1.35 x 0.05
= 0.182 m3

0.05

1.35

3 Pek. Lantai Beton Tumbuk 1:3 Volume Pek. Lantai Beton Tumbuk 1:3

V = Lbr x Pjg x Tggi


2.7 = 2.7 x 1.35 x 0.05
= 0.182 m3

0.05

1.35

VII Pek. Plafond


1 Pekerjaan Plafond Tripleks & Rangka Volume Pek. Plafond

L1 = Pjng x Lbr
= 1.35 x 1.35
1.35
= 1.823 m2

L1 = Pjng x Lbr
1.35 = 11.4 x 0.6
= 6.84 m2

0.6 L tot = L1 + L2
= 1.823 + 6.84
11.4 = 8.663 m2

VIII Pek. Pintu


1 Pekerjaan Kusen Volume Pek. Kusen
5

P kusen = 1.5 + 1.5 + 0.7


= 3.7 m1

V = Lbr x Pjg x Kllng


= 0.15 x 0.05 x 3.7
150

= 0.028 m3

Vtot = V x Jumllah
= 0.028 x 2 Kusen
= 0.056 m2
5 60 5
PERHITUNGAN VOLUME WC 2 PINTU Halaman 90 dari 153
5
150
Pekerjaan : WC 2 Pintu
Jumlah Unit Bangunan : 1 Unit

No. Sket Perhitungan


5 60 5

2 Pekerjaan Pintu Panil Volume Pek. Pintu Panil

V = Lbr x Tggi
= 0.6 x 1.5
= 0.9 m2

Vtot = V x Jumllah
150

= 0.9 x 2 Pintu
= 1.8 m2

60

3 Pekerjaan Jendela Volume Pek. Jendela

P Roster = 0.5 + 0.2 + 0.5 + 0.2


= 1.4 m1
30

V = Lbr x Pjg x Kllng


50 = 0.15 x 0.05 x 1.4
= 0.011 m3

IX Pek. Instalasi Air


A Pekerjaan Bak WC
1 Pasangan Bata Volume Pasangan Bata

L = Pjng x Lbr
= 0.8 x 0.75
= 0.6 m3
0.8
L tot = 0.6 x Sisi
= 0.6 x 4
= 2.4 m2
0.75

2 Pasangan Tegel Volume Pasangan Tegel


a Bak Luar Bak Luar
L1 = Pjng x Lbr L3 = Pjng x Lbr
= 0.8 x 0.75 = 0.75 x 0.75
= 0.6 m2 = 0.5625 m2

0.8 L2 = Pjng x Lbr L tot = L1 + L2


0.4 = 0.75 x 0.4 = 0.6 + 0.6
0.75 = 0.3 m2 = 1.7625 m2
= 0.3 x Sisi
0.75 0.75 = 0.3 x 2
= 0.6 m2

PERHITUNGAN VOLUME WC 2 PINTU Halaman 91 dari 153


Pekerjaan : WC 2 Pintu
Jumlah Unit Bangunan : 1 Unit

No. Sket Perhitungan

b Bak Dalam
Bak Dalam
0.53
L1 = Pjng x Lbr L2 = Pjng x Lbr
= 0.53 x 0.8 = 0.53 x 0.53
= 0.424 m2 = 0.2809 m2
0.8 = 0.424 x Sisi
= 0.424 x 4 L tot = L1 + L2
= 1.696 m2 = 1.696 + 0.281
= 1.9769 m2
0.53
Luas Keseluruhan

L tot = L Luar + L Dalam


= 1.763 + 1.9769
= 3.739 m2

X Pek. Septicktank
1 Galian Tanah Volume Galian Tanah

1.8 V = Lbr x Pjg x tinggi


= 1.8 x 1.3 x 1.9
= 4.446 m3
1.9

1.3

2 Pas. Dinding Volume Pasangan Dinding

L1 = Pjng x Lbr
0.3 = 0.3 x 5.1
= 1.53 m2

5.1

3 Pas. Bata Berongga Volume Bata Berongga

L2 = Pjng x Lbr
= 1.5 x 5.1
1.5 = 7.65 m2

5.1

4 Pek. Plat Penutup Beton Volume Plat Penutup Beton

V = Lbr x Pjg x tinggi


1.8 = 1.3 x 1.8 x 0.1
= 0.234 m3

0.1

1.3

XI Pek. Finishing Luas Pengecatan Dinding


a Dinding Luar
L1 = Lbr x Tggi L1 = 3.3 x Sisi
= 1.65 x 2 = 3.3 x 2
2
= 3.3 m2 = 6.6 m2

1.65 Ltot = L1 - L Jendela


= 6.6 - 0.6
= 6.00 m2

PERHITUNGAN VOLUME WC 2 PINTU Halaman 92 dari 153


Pekerjaan : WC 2 Pintu
Jumlah Unit Bangunan : 1 Unit

No. Sket Perhitungan


0.5 L2 = 1 x A x Tggi L2 = 0.338
2 = 0.338
= 1 x 1.35 x 0.5 = 0.675
1.35 2
= 1.35 x 0.5
2
= 0.675 x 0.5
= 0.338 m2

L3 = Lbr x Tggi L3 = 6.3 x Sisi


= 3.15 x 2 = 6.3 x 2
2 = 6.3 m2 = 12.6 m2

Ltot = L3 - L Kusen
3.15 = 12.6 - 4.34
= 8.26 m2

b Dinding Dalam
L4 = Lbr x Tggi L4 = 2.7 x Sisi
= 1.35 x 2 = 2.7 x 8
2
= 2.7 m2 = 21.6 m2

1.35 Ltot = L4 - L Kusen - L Jendela


= 21.6 - 4.34 - 0.6
= 16.66 m2

Luas Total Plesteran & Acian


= L1 + L2 + L3 + L4
= 6.00 + 0.675 + 16.66 + 16.7
= 40.00 m2

PERHITUNGAN VOLUME WC 2 PINTU Halaman 93 dari 153


Pekerjaan : WC 2 Pintu
Jumlah Unit Bangunan : 1 Unit

No. Sket Perhitungan

c Pengecetan Kayu Luas Pengecatan Kayu

L kusen dpn = 0.05 x 1.5 L kusen dlm = 0.15 x

5
= 0.05 x 1.5 = 0.15 x
= 0.075 m2 = 0.225 m2

= 0.075 x kiri & kanan = 0.225 x


= 0.075 x 2 = 0.225 x
150

= 0.15 m2 = 0.81 m2

= L x tinggi
= 0.7 x 0.05
= 0.035 m2

5 60 5 Ltot = 0.15 + 0.04


= 0.185 m2

L Pintu = 0.06 x 1.5


= 0.06 x 1.5
= 0.09 m2

Luas Total Pengecetan Pintu & Kusen


= 0.185 + 0.09 x 2
= 0.28 x 2
= 0.55 m2

= 0.55 + 0.81
= 1.36 m2
30

L1 = lbr x tnggi L kusen dlm = 0.15


= 0.05 x 0.3 = 0.15

50 = 0.015 m2 = 0.225

= 0.015 x kiri & kanan = 0.225


= 0.015 x 2 = 0.225
= 0.03 m2 = 0.81

L2 = lbr x tnggi
= 0.4 x 0.05
= 0.02 m2

= 0.02 x Atas & bawah


= 0.02 x 2
= 0.04 m2

Luas Total Pengecetan Jendela


= 0.03 + 0.04 x 2
= 0.07 x 2
= 0.14 m2

= 0.14 + 0.81
= 0.95 m2

Luas Total Pengecetan Jendela


= 1.36 + 0.95
= 2.31 m2

PERHITUNGAN VOLUME WC 2 PINTU Halaman 94 dari 153


Perhitungan Vol Sat Keterangan

11.00 m1

2.63 m3

x p
x 10.5
m3

0.21 m3

0.42 m3

1.58 m3
x p
x 10.5
m3

1.47 m2

0.93 m3

PERHITUNGAN VOLUME WC 2 PINTU Halaman 95 dari 153


Perhitungan Vol Sat Keterangan

0.24 m3

0.27 m3

PERHITUNGAN VOLUME WC 2 PINTU Halaman 96 dari 153


Perhitungan Vol Sat Keterangan

0.24 m3

17.11 m2

x Sisi
x 2
m2

+ L2
+ 0.675
m2

29.74 m2

x Sisi
x 2
m2

PERHITUNGAN VOLUME WC 2 PINTU Halaman 97 dari 153


Perhitungan Vol Sat Keterangan

0.12 m3

0.75 = 1.5
0.866 = 1.732
0.55 = 0.55
0.433 = 0.866
4.648

+ 0.01
m3

PERHITUNGAN VOLUME WC 2 PINTU Halaman 98 dari 153


Perhitungan Vol Sat Keterangan

13.09 m2

0.55 m3

0.18 m3

0.18 m3

8.66 m3

0.06 m3

PERHITUNGAN VOLUME WC 2 PINTU Halaman 99 dari 153


Perhitungan Vol Sat Keterangan

1.80 m2

0.01 m3

2.40 m2

3.74 m2

+ L3
+ 0.563

PERHITUNGAN VOLUME WC 2 PINTU Halaman 100 dari 153


Perhitungan Vol Sat Keterangan

4.45 m3

1.53 m2

7.65 m2

0.23 m3

40.00 m2

PERHITUNGAN VOLUME WC 2 PINTU Halaman 101 dari 153


Perhitungan Vol Sat Keterangan
x Sisi
x 2
m2

PERHITUNGAN VOLUME WC 2 PINTU Halaman 102 dari 153


Perhitungan Vol Sat Keterangan

2.31 m2

1.5
1.5

Kllng
3.6

x 1.5
x 1.5
m2

x Kllng
x 3.6
m2

PERHITUNGAN VOLUME WC 2 PINTU Halaman 103 dari 153


ANALISA & RAB WC

NO RAB : 5
Pekerjaan/ Kegiatan : Sarana Sanitasi

NO URAIAN KOEF. VOLUME

1 2 3
I PEKERJAAN PERSIAPAN
A Pembersihan Lapangan -
Pekerja 0.05 -
A Pemasangan Bowplank 11.00
Kayu 5/7 Klas III 0.01 0.07
Paku Biasa 2" - 5" 0.02 0.22
Kayu Papan 3/20 Klas III 0.01 0.08
Tukang Kayu 0.10 1.10
Pekerja 0.10 1.10
Total
Sub Total I
II PEKERJAAN TANAH PONDASI
A Pekerjaan Galian Tanah 2.63
Pekerja 0.38 1.01
Total
B Pekerjaan Urugan Pasir Bawah Pondasi 0.21
Pasir Urug 1.20 0.25
Pekerja 0.25 0.05
Total
C Pekerjaan Pasangan Batu Kosong 0.42
Batu Kali / Belah 1.15 0.48
Pasir Urug 0.30 0.13
Tukang Batu 0.39 0.16
Pekerja 0.43 0.18
Total
D Pekerjaan Pasangan Pondasi Batu Gunung /Kali 1.58
Batu Kali / Belah 1.10 1.73
Semen PC 150.00 236.25
Pasir Pasang 0.52 0.82
Tukang Batu 0.50 0.79
Pekerja 0.50 0.79
Total
E Pek. Pasangan Bata 1 : 2 Teras 1.47
Batu Bata 70.00 102.90
Semen PC 9.48 13.93
Pasir Pasang 0.04 0.06
Tukang batu 0.10 0.15
Pekerja 0.32 0.47
Total
F Pekerjaan Urugan Kembali Tanah Bekas Galian 0.93
Pekerja 0.50 0.46
Total
Sub Total II
III PEKERJAAN BETON
A Pekerjaan Sloof 0.24
Kayu Kls. III Papan 0.27 0.06
Paku Biasa 2.00 0.47
Besi Beton Polos 105.00 24.81
Kawat Beton Polos 2.25 0.53
Semen PC 225.00 53.16
Pasir Beton 0.52 0.12
Kerikil beton 0.78 0.18
Tukang Batu 0.35 0.08
Tukang Kayu 0.12 0.03
Tukang Besi 0.12 0.03
Pekerja 1.20 0.28
Total
B Pekerjaan Kolom 0.27
Kayu Kls. III papan 0.40 0.11
Paku Biasa 2.00 0.54
Besi Beton Polos 105.00 28.35
Kawat Beton Polos 2.25 0.61
Semen PC 225.00 60.75
Pasir Beton 0.52 0.14
Kerikil beton 0.78 0.21
Kayu Kls. III Balok 0.15 0.04
Tukang Batu 0.35 0.09
Tukang Kayu 0.11 0.03
Tukang Besi 1.05 0.28
Pekerja 1.10 0.30
Total
C Pekerjaan Ring Balok 0.24
Kayu Kls. III papan 0.32 0.08
Paku Biasa 3.20 0.76
Besi Beton Polos 100.00 23.63
Kawat Beton Polos 2.25 0.53
Semen PC 225.00 53.16
Pasir Beton 0.52 0.12
Kerikil beton 0.78 0.18
Kayu Kls. III Balok 0.12 0.03
Tukang Batu 0.35 0.08
Tukang Kayu 0.11 0.03
Tukang Besi 0.12 0.03
Pekerja 1.10 0.26
Total
Sub Total III
IV PEKERJAAN PASANGAN DINDING
C Pek. Pasangan Dinding 1 : 4 17.11
Batu Bata 70.00 1,183.78
Semen PC 5.75 98.42
Pasir Pasang 0.04 0.74
Tukang Batu 0.10 1.71
Pekerja 0.32 5.47
Total
D Plesteran Dinding 1 : 4 + Acian 29.74
Semen PC 10.94 325.15
Pasir Pasang 0.04 1.25
Tukang Batu 0.20 5.95
Pekerja 0.25 7.43
Total
Sub Total IV
V PEKERJAAN ATAP
A Pekerjaan Kuda-Kuda 0.12
Kayu Kls. III (Balok) 1.10 0.13
Paku Biasa 0.80 0.10
Tukang kayu 12.00 1.43
Pekerja 4.00 0.48
Total
B Pekerjaan Rangka Seng Gelombang 13.09
Kayu Kls. III (Balok Kaso 5/7) 0.004 0.04
Kayu Kls. III (Reng 3/4) 0.003 0.04
Paku Biasa 0.15 1.96
Tukang kayu 0.10 1.31
Pekerja 0.10 1.31
Total
C Pekerjaan Pemasangan Seng Gelombang 13.09
Seng BJLS .030 0.70 9.17
Paku seng 0.02 0.26
Tukang kayu 0.06 0.79
Pekerja 0.12 1.57
Total
Sub Total V
VI PEKERJAAAN LANTAI
A Pekerjaaan Urugan Tanah Bawah Lantai 0.55
Pekerja 0.50 0.27
Total
B Pekerjaan Urugan Pasir Bawah Lantai 0.18
Pasir Urug 1.20 0.22
Pekerja 0.25 0.05
Total
C Pekerjaan Lantai Beton Tumbuk 0.18
Semen PC 175.00 31.89
Pasir Beton 0.52 0.09
Kerikil beton 0.87 0.16
Tukang Batu 0.25 0.05
Pekerja 1.65 0.30
Total
D Pemasangan Tegel Keramik 20x20 3.65
Semen PC 8.00 29.16
Pasir Pasang 0.02 0.07
Tegel keramik 20 x 20 25.00 91.13
Tukang Batu 0.45 1.64
Pekerja 0.60 2.19
Total
Sub Total VI
VII PEKERJAAN PLAFOND
A Pekerjaan Plafond Tripleks & Rangka 8.66
Kayu Kls. III Balok 0.02 0.15
Tripleks 3 mm 0.38 3.25
Paku Biasa 0.03 0.26
Tukang kayu 0.40 3.47
Pekerja 0.27 2.34
Total
Sub Total VII
VIII PEKERJAAN PINTU 0.06
A Pekerjaan Kosen Pintu
Kayu Kls. II (Balok) 1.10 0.06
Paku 5-7 cm 1.25 0.07
Tukang kayu 18.00 1.00
Pekerja 6.00 0.33
Total
B Pekerjaan Pintu Panil 1.80
Kayu Kls. II (Papan) 0.12 0.21
Tukang kayu 2.00 3.60
Pekerja 1.00 1.80
Total
C Pekerjaan Kosen Jendela 0.01
Kayu Kls. III (Balok) 1.20 0.013
Paku 5-7 cm 1.25 0.013
Tukang Kayu 18.00 0.19
Pekerja 6.00 0.06
Total
D Memasang Kaca Tebal 3 mm 0.30
Kaca Polos 3 mm 1.10 0.33
Pekerja 0.02 0.005
Tukang 0.15 0.05
Total
Sub Total VIII
IX PEKERJAAN INSTALASI AIR
A Pek. Pemasangan Kloset Jongkok 2.00
Kloset Jongkok 1.00 2.00
Semen PC 6.00 12.00
Pasir Pasang 0.01 0.02
Tukang Batu 1.50 3.00
Pekerja 1.00 2.00
Total
B Pekerjaan Bak WC
a Pasangan Bata 1 : 2 2.40
Batu Bata 70.00 168.00
Semen PC 9.48 22.74
Pasir Pasang 0.04 0.09
Tukang batu 0.10 0.24
Pekerja 0.32 0.77
Total
b Pemasangan Tegel Keramik 20x20 3.74
Semen PC 8.00 29.92
Pasir Pasang 0.02 0.07
Keramik 20x20 25.00 93.49
Tukang Batu 0.45 1.68
Pekerja 0.60 2.24
Total
C Pekerjaan Pemasangan Floor Drain 2.00
Floor Drain 1.00 2.00
Tukang Batu 0.10 0.20
Pekerja 0.01 0.02
Total
Sub Total IX
X PEKERJAAAN SEPTIC TANK
a Galian Tanah 4.45
Pekerja 0.38 1.71
Total
b Pas. Dinding 1 : 4 1.53
Batu Bata 70.00 107.10
Semen PC 5.75 8.80
Pasir Pasang 0.04 0.07
Tukang Batu 0.10 0.15
Pekerja 0.32 0.49
Total
c Pas. Bata Berongga 7.65
Batu Bata 60.00 459.00
Pasir Urug 0.04 0.33
Pekerja 0.25 1.91
Tukang Batu 0.20 1.53
Total
d Plat Penutup Beton 0.23
Kayu Kls. III papan 0.32 0.07
Paku Biasa 3.20 0.75
Besi Beton Polos 100.00 23.40
Kawat Beton Polos 2.25 0.53
Semen PC 225.00 52.65
Pasir Beton 0.52 0.12
Kerikil beton 0.78 0.18
Kayu Kls. III Balok 0.12 0.03
Tukang Batu 0.35 0.08
Tukang Kayu 0.11 0.03
Tukang Besi 0.12 0.03
Pekerja 1.10 0.26
Total
Sub Total X
XI PEKERJAAN FINISHING
a Pengecatan Tembok 40.00
Plamur Tembok 0.10 4.00
Cat Dasar 0.10 4.00
Cat Tembok 0.26 10.40
Tukang Cat 0.06 2.52
Pekerja 0.02 0.80
Total
b Pengecatan Kayu 2.31
Cat Meni 0.20 0.46
Plamir Kayu 0.15 0.35
Tukang 0.01 0.02
Pekerja 0.07 0.16
Total
Sub Total XI
XII Alat 1.00
Cangkul 1.00 1.00
Sekop 1.00 1.00
Linggis 1.00 1.00
Ember 1.00 1.00
Total
Sub Total XII
Jumlah Total
ANALISA & RAB WC

Sub Pekerjaan : WC 2 Pintu


Dimensi : 1 Unit

BIAYA (Rp)

SAT
HARGA SATUAN
TOTAL

4 5 6=2x5

hok Rp 45,000 Rp -

m³ Rp 1,750,000 Rp 115,500
kg Rp 14,000 Rp 3,080
m³ Rp 1,750,000 Rp 134,750
hok Rp 65,000 Rp 71,500
hok Rp 45,000 Rp 49,500
Total Rp 374,330
Sub Total I Rp 374,330


hok Rp 45,000 Rp 45,360
Total Rp 45,360

m³ Rp 85,000 Rp 21,420
hok Rp 45,000 Rp 2,363
Total Rp 23,783

m³ Rp 100,000 Rp 48,300
m³ Rp 85,000 Rp 10,710
hok Rp 65,000 Rp 10,647
hok Rp 45,000 Rp 8,033
Total Rp 77,690

m³ Rp 100,000 Rp 173,250
kg Rp 1,400 Rp 330,750
m³ Rp 85,000 Rp 69,615
hok Rp 65,000 Rp 51,188
hok Rp 45,000 Rp 35,438
Total Rp 660,240
m2
bh Rp 500 Rp 51,450
kg Rp 1,400 Rp 19,500
m³ Rp 85,000 Rp 4,748
hok Rp 65,000 Rp 9,555
hok Rp 45,000 Rp 21,168
Total Rp 106,421

hok Rp 45,000 Rp 20,841
Total Rp 20,841
Sub Total II Rp 934,333


m³ Rp 1,750,000 Rp 111,628
kg Rp 14,000 Rp 6,615
kg Rp 9,000 Rp 223,256
kg Rp 20,000 Rp 10,631
kg Rp 1,400 Rp 74,419
m³ Rp 85,000 Rp 10,442
m³ Rp 115,000 Rp 21,192
hok Rp 65,000 Rp 5,375
hok Rp 65,000 Rp 1,843
hok Rp 65,000 Rp 1,843
hok Rp 45,000 Rp 12,758
Total Rp 480,001

m³ Rp 1,750,000 Rp 189,000
kg Rp 14,000 Rp 7,560
kg Rp 9,000 Rp 255,150
kg Rp 20,000 Rp 12,150
kg Rp 1,400 Rp 85,050
m³ Rp 85,000 Rp 11,934
m³ Rp 115,000 Rp 24,219
m³ Rp 1,750,000 Rp 70,875
hok Rp 65,000 Rp 6,143
hok Rp 65,000 Rp 1,931
hok Rp 65,000 Rp 18,428
hok Rp 45,000 Rp 13,365
Total Rp 695,804

m³ Rp 1,750,000 Rp 132,300
kg Rp 14,000 Rp 10,584
kg Rp 9,000 Rp 212,625
kg Rp 20,000 Rp 10,631
kg Rp 1,400 Rp 74,419
m³ Rp 85,000 Rp 10,442
m³ Rp 115,000 Rp 21,192
m³ Rp 1,750,000 Rp 49,613
hok Rp 65,000 Rp 5,375
hok Rp 65,000 Rp 1,689
hok Rp 65,000 Rp 1,843
hok Rp 45,000 Rp 11,694
Total Rp 542,406
Sub Total III Rp 1,718,211
m2
bh Rp 500 Rp 591,892
kg Rp 1,400 Rp 137,789
m³ Rp 85,000 Rp 62,519
hok Rp 65,000 Rp 111,183
hok Rp 45,000 Rp 246,312
Total Rp 1,149,694
m2
kg Rp 1,400 Rp 455,213
m³ Rp 85,000 Rp 106,154
hok Rp 65,000 Rp 386,555
hok Rp 45,000 Rp 334,519
Total Rp 1,282,441
Sub Total IV Rp 2,432,135


m³ Rp 1,750,000 Rp 229,975
kg Rp 14,000 Rp 1,338
hok Rp 65,000 Rp 93,185
hok Rp 45,000 Rp 21,504
Total Rp 346,002
m2
m³ Rp 1,750,000 Rp 74,160
m³ Rp 1,750,000 Rp 73,328
kg Rp 14,000 Rp 27,498
hok Rp 65,000 Rp 85,113
hok Rp 45,000 Rp 58,924
Total Rp 319,024
m2
lbr Rp 50,000 Rp 458,301
kg Rp 28,000 Rp 7,333
hok Rp 65,000 Rp 51,068
hok Rp 45,000 Rp 70,709
Total Rp 587,410
Sub Total V Rp 1,252,436


hok Rp 45,000 Rp 12,302
Total Rp 12,302

m³ Rp 85,000 Rp 18,590
hok Rp 45,000 Rp 2,050
Total Rp 20,640

kg Rp 1,400 Rp 44,651
m³ Rp 85,000 Rp 8,055
m³ Rp 115,000 Rp 18,234
hok Rp 65,000 Rp 2,962
hok Rp 45,000 Rp 13,532
Total Rp 87,434

kg Rp 1,400 Rp 40,824
m³ Rp 85,000 Rp 5,577
bh Rp 2,680 Rp 244,215
hok Rp 65,000 Rp 106,616
hok Rp 45,000 Rp 98,415
Total Rp 495,647
Sub Total VI Rp 616,023

m2
m³ Rp 1,750,000 Rp 261,166
lbr Rp 45,000 Rp 146,180
kg Rp 14,000 Rp 3,638
hok Rp 65,000 Rp 225,225
hok Rp 45,000 Rp 105,249
Total Rp 741,458
Sub Total VII Rp 741,458

m³ Rp 2,600,000 Rp 158,730
kg Rp 14,000 Rp 971
hok Rp 65,000 Rp 64,935
hok Rp 45,000 Rp 14,985
Total Rp 239,621
m2
m³ Rp 2,600,000 Rp 535,600
hok Rp 65,000 Rp 234,000
hok Rp 45,000 Rp 81,000
Total Rp 850,600
m2
m³ Rp 1,750,000 Rp 22,050
kg Rp 14,000 Rp 184
hok Rp 65,000 Rp 12,285
hok Rp 45,000 Rp 2,835
Total Rp 37,354

m2 Rp 100,000 Rp 33,000
hok Rp 45,000 Rp 203
hok Rp 65,000 Rp 2,925
Total Rp 36,128
Sub Total VIII Rp 1,163,703

ls
bh Rp 170,000 Rp 340,000
kg Rp 1,400 Rp 16,800
m³ Rp 85,000 Rp 1,700
hok Rp 65,000 Rp 195,000
hok Rp 45,000 Rp 90,000
Total Rp 643,500
m2
bh Rp 500 Rp 84,000
kg Rp 1,400 Rp 31,836
m³ Rp 85,000 Rp 7,752
hok Rp 65,000 Rp 15,600
hok Rp 45,000 Rp 34,560
Total Rp 173,748
m2
kg Rp 1,400 Rp 41,881
m³ Rp 85,000 Rp 5,721
m2 Rp 2,680 Rp 250,540
hok Rp 65,000 Rp 109,377
hok Rp 45,000 Rp 100,964
Total Rp 508,484
ls
bh Rp 35,000 Rp 70,000
hok Rp 65,000 Rp 13,000
hok Rp 45,000 Rp 900
Total Rp 83,900
Sub Total IX Rp 1,409,632


hok Rp 45,000 Rp 76,827
Total Rp 76,827
m2
bh Rp 500 Rp 53,550
kg Rp 1,400 Rp 12,317
m³ Rp 85,000 Rp 5,592
hok Rp 65,000 Rp 9,945
hok Rp 45,000 Rp 22,032
Total Rp 103,436
m2
bh Rp 500 Rp 229,500
m³ Rp 85,000 Rp 27,961
hok Rp 45,000 Rp 86,063
hok Rp 65,000 Rp 99,450
Total Rp 442,973

m³ Rp 1,750,000 Rp 131,040
kg Rp 14,000 Rp 10,483
kg Rp 9,000 Rp 210,600
kg Rp 20,000 Rp 10,530
kg Rp 1,400 Rp 73,710
m³ Rp 85,000 Rp 10,343
m³ Rp 115,000 Rp 20,990
m³ Rp 1,750,000 Rp 49,140
hok Rp 65,000 Rp 5,324
hok Rp 65,000 Rp 1,673
hok Rp 65,000 Rp 1,825
hok Rp 45,000 Rp 11,583
Total Rp 537,241
Sub Total X Rp 1,160,476

m2
kg Rp 7,600 Rp 30,396
kg Rp 5,000 Rp 19,998
kg Rp 16,000 Rp 166,379
hok Rp 65,000 Rp 163,780
hok Rp 45,000 Rp 35,996
Total Rp 416,548
m2
kg Rp 20,000 Rp 9,240
kg Rp 20,000 Rp 6,930
hok Rp 65,000 Rp 1,351
hok Rp 45,000 Rp 7,277
Total Rp 24,798
Sub Total XI Rp 441,346

bh Rp 50,000 Rp 50,000
bh Rp 50,000 Rp 50,000
bh Rp 35,000 Rp 35,000
bh Rp 15,000 Rp 15,000
Total Rp 150,000
Sub Total XII Rp 150,000
Jumlah Total Rp 12,394,082
RENCANA ANGGARAN BIAYA

NO RAB : 5
Pekerjaan/ Kegiatan : Sarana Sanitasi

VOLUME BIA
HARGA SATUAN
NO URAIAN KONTRIBUSI MASYRAKAT SATUAN
TOTAL APBN APBD (Rp) TOTAL
IN CASH IN KIND
1 2 3 4 5 6 7 8 9
I BAHAN
Batu Bata 2,020.78 - - - 2,020.78 bh Rp 500 Rp 1,010,392
Batu Kali / Belah 2.22 - - - 2.22 m³ Rp 100,000 Rp 221,550
Besi Beton Polos 100.18 - - - 100.18 kg Rp 9,000 Rp 901,631
Cat Dasar Tembok 4.00 - - - 4.00 kg Rp 5,000 Rp 19,998
Cat Meni 0.46 - - - 0.46 kg Rp 20,000 Rp 9,240
Cat Tembok 10.40 - - - 10.40 kg Rp 16,000 Rp 166,379
Floor Drain 2.00 - - - 2.00 bh Rp 35,000 Rp 70,000
Kawat Beton Polos 2.20 - - - 2.20 kg Rp 20,000 Rp 43,943
Kayu Kls. II 0.27 - - - 0.27 m³ Rp 2,600,000 Rp 694,330
Kayu Kls. III 0.94 - - - 0.94 m³ Rp 1,750,000 Rp 1,644,525
Kerikil 0.92 - - - 0.92 m³ Rp 115,000 Rp 105,826
Kloset Jongkok 2.00 - - - 2.00 bh Rp 170,000 Rp 340,000
Paku Biasa 5.14 - - - 5.14 kg Rp 14,000 Rp 71,952
Paku seng 0.26 - - - 0.26 kg Rp 28,000 Rp 7,333
Plamir Kayu 0.35 - - - 0.35 kg Rp 20,000 Rp 6,930
Plamur Tembok 4.00 - - - 4.00 kg Rp 7,600 Rp 30,396
Pasir 4.70 - - - 4.70 m³ Rp 85,000 Rp 399,275
Semen PC 1,027.97 - - - 1,027.97 kg Rp 1,400 Rp 1,439,158
Seng BJLS .030 9.17 - - - 9.17 lmbr Rp 50,000 Rp 458,301
Tripleks 3 mm 3.25 - - - 3.25 lmbr Rp 45,000 Rp 146,180
Kaca Bening 3 mm 0.33 - - - 0.33 m2 Rp 100,000 Rp 33,000
Keramik 20x20 184.61 - - - 184.61 m2 Rp 2,680 Rp 494,755
sub total I Rp 8,315,092
II ALAT
Cangkul 1.00 - - - 1.00 bh Rp 50,000 Rp 50,000
Sekop 1.00 - - - 1.00 bh Rp 50,000 Rp 50,000
Linggis 1.00 - - - 1.00 bh Rp 35,000 Rp 35,000
Ember 1.00 - - - 1.00 bh Rp 15,000 Rp 15,000
sub total II Rp 150,000
III UPAH
Pekerja 38.87 - - - 38.87 hok Rp 45,000 Rp 1,749,258
Tukang 33.53 - - - 33.53 hok Rp 65,000 Rp 2,179,733
sub total III Rp 3,928,991
Jumlah total Rp 12,394,082

Rp -
NCANA ANGGARAN BIAYA

Sub Pekerjaan : WC 2 Pintu


Dimensi : 1 Unit

BIAYA (Rp)
KONTRIBUSI MASYARAKAT
APBN APBD
IN CASH IN KIND
10 11 12 13

Rp - Rp - Rp - Rp 1,010,392
Rp - Rp - Rp - Rp 221,550
Rp - Rp - Rp - Rp 901,631
Rp - Rp - Rp - Rp 19,998
Rp - Rp - Rp - Rp 9,240
Rp - Rp - Rp - Rp 166,379
Rp - Rp - Rp - Rp 70,000
Rp - Rp - Rp - Rp 43,943
Rp - Rp - Rp - Rp 694,330
Rp - Rp - Rp - Rp 1,644,525
Rp - Rp - Rp - Rp 105,826
Rp - Rp - Rp - Rp 340,000
Rp - Rp - Rp - Rp 71,952
Rp - Rp - Rp - Rp 7,333
Rp - Rp - Rp - Rp 6,930
Rp - Rp - Rp - Rp 30,396
Rp - Rp - Rp - Rp 399,275
Rp - Rp - Rp - Rp 1,439,158
Rp - Rp - Rp - Rp 458,301
Rp - Rp - Rp - Rp 146,180
Rp - Rp - Rp - Rp 33,000
Rp - Rp - Rp - Rp 494,755
Rp - Rp - Rp - Rp 8,315,092

Rp - Rp - Rp - Rp 50,000
Rp - Rp - Rp - Rp 50,000
Rp - Rp - Rp - Rp 35,000
Rp - Rp - Rp - Rp 15,000
Rp - Rp - Rp - Rp 150,000

Rp - Rp - Rp - Rp 1,749,258
Rp - Rp - Rp - Rp 2,179,733
Rp - Rp - Rp - Rp 3,928,991
Rp - Rp - Rp - Rp 12,394,082
PROGRAM PAMSIMAS
(PENYEDIAAN AIR BERSIH & SARANA SANITASI BERBASIS MASYARAKAT)
RENCANA ANGGARAN BIAYA
0

No RAB : 6 Program : PAMSIMAS


Pekerjaan/Kegiatan : Pelatihan LKM Jenis : RAB Pemberdayaan

Volume Harga BIAYA


No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN APBD Satuan (Rp) Total
Incash Inkind Incash Inkind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8
A Teknik
A.1 ATK Pelatihan
1. Spidol Besar 2 - - - 2 Bh Rp 5,000 Rp 10,000 Rp - Rp -
3. Kertas Plano 7 - - - 7 lembar Rp 1,000 Rp 7,000 Rp - Rp -
4. Lakban Kertas 1 - - - 1 Bh Rp 5,000 Rp 5,000 Rp - Rp -
Sub Total A.1 Rp 22,000 Rp - Rp -
A.2 ATK Peserta
1. Map Plastik 26 - - - 26 Bh Rp 2,500 Rp 65,000 Rp - Rp -
2. note Book 26 - - - 26 Bh Rp 3,500 Rp 91,000 Rp - Rp -
3. Pena 26 - - - 26 Bh Rp 2,500 Rp 65,000 Rp - Rp -
4. Foto Copy Modul dan Jilid 17 - - - 17 Rangkap Rp 15,000 Rp 255,000 Rp - Rp -
Sub Total A.2 Rp 476,000
A.3 Kostum
1. Baju Kaos 26 - - - 26 Bh Rp 50,000 Rp 1,300,000 Rp - Rp -
Sub Total A.3 Rp 1,300,000 Rp - Rp -
A.4 Konsumsi
1. Snack ringan 29 - - - 29 Bungkus Rp 3,000 Rp 87,000 Rp - Rp -
2. Snack Berat 29 - - - 29 Bungkus Rp 11,000 Rp 319,000 Rp - Rp -
Sub Total A.4 Rp 406,000 Rp - Rp -
Sub Total A Rp 2,204,000
Volume Harga BIAYA
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN APBD Satuan (Rp) Total
Incash Inkind Incash Inkind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8
B Manajemen Keuangan
Dan Adm. Proyek
B.1 ATK Pelatihan
1. Spidol Besar 1 - - - 1 Bh Rp 5,000 Rp 5,000 Rp - Rp -
3. Kertas Plano 6 - - - 6 lembar Rp 1,000 Rp 6,000 Rp - Rp -
4. Lakban Kertas 1 - - - 1 bh Rp 5,000 Rp 5,000 Rp - Rp -
Sub Total B.1 Rp 16,000 Rp - Rp -
A.2 ATK Peserta
1. Map Plastik 26 - - - 26 Bh Rp 2,500 Rp 65,000 Rp - Rp -
2. note Book 26 - - - 26 Bh Rp 3,500 Rp 91,000 Rp - Rp -
3. Pena 26 - - - 26 Rangkap Rp 2,500 Rp 65,000 Rp - Rp -
4. Foto Copy Modul dan Jilid 17 - - - 17 Bh Rp 15,000 Rp 255,000 Rp - Rp -
Sub Total B.2 Rp 476,000 Rp - Rp -
B.3 Konsumsi
1. Snack ringan 29 - - - 29 Bungkus Rp 3,000 Rp 87,000 Rp - Rp -
2. Snack Berat 29 - - - 29 Bungkus Rp 11,000 Rp 319,000 Rp - Rp -
Sub Total B.3 Rp 406,000 Rp - Rp -
Sub Total B Rp 898,000
Volume Harga BIAYA
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN APBD Satuan (Rp) Total
Incash Inkind Incash Inkind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8
C Program Kesehatan
Masyarakat dan Sekolah
C.1 ATK Pelatihan
1. Spidol Besar 1 - - - 1 Bh Rp 5,000 Rp 5,000 Rp - Rp -
2. Kertas Plano 6 - - - 6 lembar Rp 1,000 Rp 6,000 Rp - Rp -
3. Lakban Kertas 1 - - - 1 Bh Rp 5,000 Rp 5,000 Rp - Rp -
Sub Total C.1 Rp 16,000 Rp - Rp -
C.2 ATK Peserta
1. Map Plastik 26 - - - 26 Bh Rp 2,500 65,000 Rp - Rp -
1. Note book 26 - - - 26 Bh Rp 3,500 91,000 Rp - Rp -
2. Pena 26 - - - 26 Bh Rp 2,500 65,000 Rp - Rp -
3. Foto Copy Modul dan Jilid 17 - - - 17 Rangkap Rp 15,000 255,000 Rp - Rp -
Sub TotalC.2 Rp 476,000 Rp - Rp -
C.3 Konsumsi
2. Snack ringan 29 - - - 29 Bungkus Rp 3,000 Rp 87,000 Rp - Rp -
3. Snack Berat 29 - - - 29 Bungkus Rp 11,000 Rp 319,000 Rp - Rp -
Sub Total C.3 Rp 406,000 Rp - Rp -
Sub Total C Rp 898,000 Rp - Rp -
Total = Sub( A + B + C ) Rp 4,000,000 Rp - Rp -

Boalemo, Juni 201


Disetujui Oleh Dibuat Oleh
Ketua DPMU Koordinator LKM CF Pemberdayaan Satlak Pamsimas

Hendra Ali, ST 0 Abdullah Said, S.Sos


PROGRAM PAMSIMAS
(PENYEDIAN AIR MINUM & SANITASI BERBASIS MASYARAKAT)
RENCANA ANGGARAN BIAYA
0

No RAB : 7 Program : PAMSIMAS


Pekerjaan/Kegiatan : Pelatihan BPS Jenis : RAB Pemberdayaan
Ukuran : Paket
Volume Harga BIAYA
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN APBD Satuan (Rp) Total
Incash Inkind Incash Inkind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8
A Teknik Pemeliharaan
dan Operasional
A.1 ATK Pelatihan
1. Spidol Besar 6 - - - 6 Bh Rp 5,000 Rp 30,000 - -
2. Kertas HVS 1 - - - 1 Rim Rp 35,000 Rp 35,000 - -
3. Kertas Plano 2 - - - 2 Kg Rp 17,500 Rp 35,000 - -
4. Lakban Kertas 2 - - - 2 Bh Rp 5,000 Rp 10,000 - -
5. Stapler 1 - - - 1 Bh Rp 17,500 Rp 17,500 - -
6. Isi Stapler 2 - - - 2 Kotak Rp 2,500 Rp 5,000 - -
7. Penggaris 1 Meter 1 - - - 1 Bh Rp 15,000 Rp 15,000 - -
8. Spidol Kecil 6 - - - 6 Bh Rp 1,400 Rp 8,400 - -
9. Cutter 1 - - - 1 Bh Rp 7,700 Rp 7,700 - -
10. Busur 13 - - - 13 Bh Rp 3,500 Rp 45,500 - -
11. Kalkulator 1 - - - 1 Bh Rp 85,000 Rp 85,000 - -
12. Spanduk 1 - - - 1 Ls Rp 300,000 Rp 300,000 - -
Sub Total A.1 Rp 594,100 Rp - Rp -
A.2 ATK Peserta
1. Map Plastik 16 - - - 16 Bh Rp 4,500 Rp 72,000 Rp - Rp -
2. Buku 16 - - - 16 Bh Rp 3,500 Rp 56,000 Rp - Rp -
3. Pena 16 - - - 16 Bh Rp 2,500 Rp 40,000 Rp - Rp -
4. Foto Copy Modul dan Jilid 16 - - - 16 Rangkap Rp 15,000 Rp 240,000 Rp - Rp -
Sub Total A.2 Rp 408,000 Rp - Rp -
A.3 Kostum
1. Baju Kaos 8 - - - 8 Bh Rp 50,000 Rp 400,000
2. Topi 8 - - - 8 Bh Rp 15,000 Rp 120,000
Sub Total A.3 Rp 520,000 Rp - Rp -
A.4 Konsumsi
1. Aqua 1 - - - 1 Dos Rp 25,000 Rp 25,000 - -
2. Snack ringan 23 - - - 23 Bungkus Rp 5,000 Rp 115,000 - -
3. Snack Berat 23 - - - 23 Bungkus Rp 12,000 Rp 276,000 - -
Sub Total A.4 Rp 416,000 Rp - Rp -
Sub Total A Rp 1,938,100
Volume Harga BIAYA
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN APBD Satuan (Rp) Total
Incash Inkind Incash Inkind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8
B Manajemen Keuangan
Dan Adm. BPS
B.1 ATK Pelatihan
1. Spidol Besar 6 - - - 6 Bh 5,000 30,000 Rp - Rp -
2. Kertas Plano 2 - - - 2 Kg 17,500 35,000 Rp - Rp -
3. Kertas HVS 1 - - - 1 Rim 35,000 35,000 Rp - Rp -
4. Kertas Warna warni 12 - - - 12 Lbr 1,500 18,000 Rp - Rp -
5. Lakban Kertas 1 - - - 1 Bh 5,000 5,000 Rp - Rp -
6. Isi Stapler 2 - - - 2 Kotak 2,500 5,000 Rp - Rp -
7. Spidol Kecil 6 - - - 6 Bh 1,400 8,400 Rp - Rp -
8. Lem Hakol Besar 2 - - - 2 Bh 12,000 24,000 Rp - Rp -
Sub Total B.1 Rp 160,400 Rp - Rp -
B.2 ATK Peserta
1. Buku 16 16 Bh Rp 3,500 Rp 56,000 Rp - Rp -
2. Pena 16 16 Bh Rp 2,500 Rp 40,000 Rp - Rp -
3. Foto Copy Modul dan jilid 16 16 Rangkap Rp 15,000 Rp 240,000 Rp - Rp -
4. Buku album besar 16 16 Bh Rp 15,000 Rp 240,000 Rp - Rp -
Sub Total B.2 Rp 576,000 Rp - Rp -
B.3 Konsumsi
1. Aqua 1 - - - 1 Dos Rp 25,000 Rp 25,000 Rp - Rp -
2. Snack ringan 23 - - - 23 Bungkus Rp 5,000 Rp 115,000 Rp - Rp -
3. Snack Berat 23 - - - 23 Bungkus Rp 12,000 Rp 276,000 Rp - Rp -
Sub Total B.3 Rp 416,000 Rp - Rp -
Sub Total B Rp 1,152,400

Volume Harga BIAYA


No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN APBD Satuan (Rp) Total
Incash Inkind Incash Inkind
1 2=3+4+5+6 3 4 5 6 7 8 9=2x8 10=3x8 11=4x8
C Program Kesehatan
Lingkungan
C.1 ATK Pelatihan
1. Spidol Besar 6 - - - 6 Bh Rp 5,000 Rp 30,000 Rp - Rp -
2. Kertas Plano 3 - - - 3 Kg Rp 17,500 Rp 52,500 Rp - Rp -
3. Lakban Kertas 1 - - - 1 Bh Rp 5,000 Rp 5,000 Rp - Rp -
4. Isi Stapler 2 - - - 2 Kotak Rp 2,500 Rp 5,000 Rp - Rp -
5. Spidol Kecil 6 - - - 6 Bh Rp 1,500 Rp 9,000 Rp - Rp -
Sub Total C.1 Rp 101,500 Rp - Rp -
C.2 ATK Peserta Rp - Rp -
1. Buku 16 - - - 16 Bh Rp 3,500 Rp 56,000 Rp - Rp -
2. Pena 16 - - - 16 Bh Rp 2,500 Rp 40,000 Rp - Rp -
3. Foto Copy Modul dan Jilid 16 - - - 16 Rangkap Rp 15,000 Rp 240,000 Rp - Rp -
4. Penggaris 30 cm 16 - - - 16 Bh Rp 3,500 Rp 56,000 Rp - Rp -
Sub TotalC.2 Rp 392,000 Rp - Rp -
C.3 Konsumsi Rp - Rp -
1. Aqua 1 - - - 1 Dos Rp 25,000 Rp 25,000 Rp - Rp -
2. Snack ringan 23 - - - 23 Bungkus Rp 5,000 Rp 115,000 Rp - Rp -
3. Snack Berat 23 - - - 23 Bungkus Rp 12,000 Rp 276,000 Rp - Rp -
Sub Total C.3 Rp 416,000 Rp - Rp -
Sub Total C Rp 909,500 Rp - Rp -
Total = Sub( A + B + C ) Rp 4,000,000 Rp - Rp -
Dibulatkan Rp 4,000,000 Rp - Rp -
Boalemo, Juni 201
Disetujui Oleh Dibuat Oleh
Ketua DPMU Koordinator LKM CF Pemberdayaan Satlak Pamsimas

Hendra Ali, ST 0 Abdullah Said, S.Sos


PROGRAM PAMSIMAS
RSIH & SARANA SANITASI BERBASIS MASYARAKAT)
RENCANA ANGGARAN BIAYA
0

BIAYA
APBN APBD
12=5x8 13=6x8

Rp - Rp 10,000
Rp - Rp 7,000
Rp - Rp 5,000
Rp - Rp 22,000.00

Rp - Rp 65,000
Rp - Rp 91,000
Rp - Rp 65,000
Rp - Rp 255,000
Rp 476,000

Rp - Rp 1,300,000
Rp - Rp 1,300,000.00

Rp - Rp 87,000
Rp - Rp 319,000
Rp - Rp 406,000.00
Rp 2,204,000
BIAYA
APBN APBD
12=5x8 13=6x8

Rp - Rp 5,000
Rp - Rp 6,000
Rp - Rp 5,000
Rp - Rp 16,000

Rp - Rp 65,000
Rp - Rp 91,000
Rp - Rp 65,000
Rp - Rp 255,000
Rp - Rp 476,000

Rp - Rp 87,000
Rp - Rp 319,000
Rp - Rp 406,000
Rp 898,000
BIAYA
APBN APBD
12=5x8 13=6x8

Rp - Rp 5,000
Rp - Rp 6,000
Rp - Rp 5,000
Rp - Rp 16,000

Rp - 65000
Rp - Rp 91,000
Rp - Rp 65,000
Rp - Rp 255,000
Rp - Rp 476,000

Rp - Rp 87,000
Rp - Rp 319,000
Rp - Rp 406,000
Rp - Rp 898,000
Rp - Rp 4,000,000

Boalemo, Juni 2010


Dibuat Oleh
Satlak Pamsimas

-
PROGRAM PAMSIMAS
R MINUM & SANITASI BERBASIS MASYARAKAT)
RENCANA ANGGARAN BIAYA
0

BIAYA
APBN APBD
12=5x8 13=6x8

0 Rp 30,000
0 Rp 35,000
0 Rp 35,000
0 Rp 10,000
0 Rp 17,500
0 Rp 5,000
0 Rp 15,000
0 Rp 8,400
0 Rp 7,700
0 Rp 45,500
0 Rp 85,000
0 Rp 300,000
Rp - Rp 594,100.00

Rp - Rp 72,000
Rp - Rp 56,000
Rp - Rp 40,000
Rp - Rp 240,000
Rp - Rp 408,000

Rp 400,000
Rp 120,000
Rp - Rp 520,000.00

0 Rp 25,000
0 Rp 115,000
0 Rp 276,000
Rp - Rp 416,000.00
Rp 1,938,100
BIAYA
APBN APBD
12=5x8 13=6x8

Rp - 30,000
Rp - 35,000
Rp - 35,000
Rp - 18,000
Rp - 5,000
Rp - 5,000
Rp - 8,400
Rp - 24,000
Rp - Rp 160,400
Rp - Rp 56,000
Rp - Rp 40,000
Rp - Rp 240,000
Rp - Rp 240,000
Rp - Rp 576,000

Rp - Rp 25,000
Rp - Rp 115,000
Rp - Rp 276,000
Rp - Rp 416,000
Rp 1,152,400

BIAYA
APBN APBD
12=5x8 13=6x8

Rp - Rp 30,000
Rp - Rp 52,500
Rp - Rp 5,000
Rp - Rp 5,000
Rp - Rp 9,000
Rp - Rp 101,500
Rp -
Rp - Rp 56,000
Rp - Rp 40,000
Rp - Rp 240,000
Rp - Rp 56,000
Rp - Rp 392,000
Rp -
Rp - Rp 25,000
Rp - Rp 115,000
Rp - Rp 276,000
Rp - Rp 416,000
Rp - Rp 909,500
Rp - Rp 4,000,000
Rp - Rp 5,000,000
Boalemo, Juni 2010
Dibuat Oleh
Satlak Pamsimas

-
RENCANA ANGGARAN BIAYA
RENCANA ANGGARAN BIAYA OPERASIONAL LKM
0

NO RAB : 8
Pekerjaan/ Kegiatan :

Konstribusi Masyarakat
NO URAIAN Satuan
Total APBN APBD
InCash InKind

1 2=3+4+5+6 3 4 5 6 7
A ATK LKM
1 Kalkulator 1.00 - - 1.00 - Bh
2 Map 7.00 - - 7.00 - Bh
3 Amplop 3.00 - - 3.00 - Dos
4 Kertas A.4 2.00 - - 2.00 - Rim
5 Kertas Folio 1.00 - - 1.00 - Rim
6 Kertas Sampul 15.00 - - 15.00 - Lbr
7 Buku Agenda / Block Note 2.00 - - 2.00 - Bh
8 Materai 6000 10.00 - - 10.00 - Lbr
9 Pena 12.00 - - 12.00 - Bh
10 Pensil 2B 2.00 - - 2.00 - Bh
11 Peraut Pensil 1.00 - - 1.00 - Bh
12 Penghapus 1.00 - - 1.00 - Bh
13 Penggaris 1.00 - - 1.00 - Bh
14 Stappler 1.00 - - 1.00 - Bh
15 Isi stapler 3.00 - - 3.00 - Dos
16 Spidol Besar 12.00 - - 12.00 - Bh
17 spidol Kecil 12.00 - - 12.00 - Bh
18 Lakban Kertas 6.00 - - 6.00 - Rol
19 Kertas Plano 2.00 - - 2.00 - Kg
20 Buku Tulis Album 5.00 - - 5.00 - Bh
21 Karton 12.00 - - 12.00 - Lbr
22 Map Plastik 12.00 - - 12.00 - Bh
23 Tip X 2.00 - - 2.00 - Bh
24 Tinta Printer HP 2.00 - - 2.00 - Bh
25 Stabilo 6.00 - - 6.00 - Bh
26 Lak Ban Hitam 5.00 - - 5.00 - Rol
Sub Total A
B DOKUMENTASI
1 Rol Film 36 5.00 - - 5.00 - Rol
2 Cuci Cetak 5.00 - - 5.00 - Ls
Sub Total B
C ADMINISTRASI LKM
1 Pembuatan Cap LKM 1.00 - - 1.00 - Bh
2 Bantalan Cap LKM 1.00 - - 1.00 - Bh
3 Isi Tinta Bantalan Cap 3.00 - - 3.00 - Bh
4 Pembuatan Papan Informasi 1.00 - - 1.00 - Bh
5 Pembuatan Papan Nama Proyek 1.00 - - 1.00 - Bh
6 Pembuatan Papan Sekretariat 1.00 - - 1.00 - Bh
7 Foto Copy Dokumen 1,100.00 - - 1,100.00 - Lbr
8 Pembolong Kertas 1.00 - - 1.00 - Bh
9 Pembelian Cat @ 5 kg 2.00 - - 2.00 - Bh
10 Foto Copy Pembukuan 929.00 - - 929.00 - Lbr
11 Map Snelhekter 12.00 - - 12.00 - Bh
Sub Total C
D TRANSPORTASI LKM
1 Perjalanan LKM Survey Harga di ibu Kota Propinsi ( 2 Org) 5.00 - - 5.00 - Org
2 Perjalanan LKM ke Kabupaten (2 org) 14.00 - - 14.00 - Org
3 Perjalanan LKM ke Bank (2 Org) 24.00 - - 24.00 - Org
4 Perjalanan LKM ke Toko (2 Org) 33.00 - - 33.00 - Org
Sub Total D
Total
Dibulatkan

Di setujui
Ketua DPMU Koordinator LKM CF Pemberdayaan

Husain Van Gobel 0 Abdullah Said, S.Sos


RENCANA ANGGARAN BIAYA
A ANGGARAN BIAYA OPERASIONAL LKM
0

Sub Pekerjaan/
Dimensi : 1 Kegiatan : Biaya Operasional LKM
Paket

Biaya (Rp)
Harga Satuan Kontribusi
(Rp) Total APBN APBD
InCash Inkind

8 9=2x8 10=3x8 11=4x8 12=5x8 13=6x8

Rp 85,000 Rp 85,000 Rp - Rp - Rp 85,000 Rp -


Rp 1,000 Rp 7,000 Rp - Rp - Rp 7,000 Rp -
Rp 13,500 Rp 40,500 Rp - Rp - Rp 40,500 Rp -
Rp 35,000 Rp 70,000 Rp - Rp - Rp 70,000 Rp -
Rp 35,000 Rp 35,000 Rp - Rp - Rp 35,000 Rp -
Rp 1,500 Rp 22,500 Rp - Rp - Rp 22,500 Rp -
Rp 3,500 Rp 7,000 Rp - Rp - Rp 7,000 Rp -
Rp 7,500 Rp 75,000 Rp - Rp - Rp 75,000 Rp -
Rp 2,500 Rp 30,000 Rp - Rp - Rp 30,000 Rp -
Rp 2,500 Rp 5,000 Rp - Rp - Rp 5,000 Rp -
Rp 1,500 Rp 1,500 Rp - Rp - Rp 1,500 Rp -
Rp 1,500 Rp 1,500 Rp - Rp - Rp 1,500 Rp -
Rp 3,500 Rp 3,500 Rp - Rp - Rp 3,500 Rp -
Rp 17,500 Rp 17,500 Rp - Rp - Rp 17,500 Rp -
Rp 2,500 Rp 7,500 Rp - Rp - Rp 7,500 Rp -
Rp 5,000 Rp 60,000 Rp - Rp - Rp 60,000 Rp -
Rp 1,400 Rp 16,800 Rp - Rp - Rp 16,800 Rp -
Rp 9,000 Rp 54,000 Rp - Rp - Rp 54,000 Rp -
Rp 20,000 Rp 40,000 Rp - Rp - Rp 40,000 Rp -
Rp 12,500 Rp 62,500 Rp - Rp - Rp 62,500 Rp -
Rp 1,500 Rp 18,000 Rp - Rp - Rp 18,000 Rp -
Rp 4,500 Rp 54,000 Rp - Rp - Rp 54,000 Rp -
Rp 3,500 Rp 7,000 Rp - Rp - Rp 7,000 Rp -
Rp 35,000 Rp 70,000 Rp - Rp - Rp 70,000 Rp -
Rp 6,500 Rp 39,000 Rp - Rp - Rp 39,000 Rp -
Rp 12,500 Rp 62,500 Rp - Rp - Rp 62,500 Rp -
Sub Total A 892,300.00 Rp - Rp - 892,300.00 -

25,000.00 Rp 125,000 Rp - Rp - Rp 125,000 Rp -


60,000.00 Rp 300,000 Rp - Rp - Rp 300,000 Rp -
Sub Total B Rp 425,000 Rp - Rp - Rp 425,000 Rp -
60,000.00 Rp 60,000 Rp - Rp - Rp 60,000 Rp -
7,500.00 Rp 7,500 Rp - Rp - Rp 7,500 Rp -
10,000.00 Rp 30,000 Rp - Rp - Rp 30,000 Rp -
150,000.00 Rp 150,000 Rp - Rp - Rp 150,000 Rp -
150,000.00 Rp 150,000 Rp - Rp - Rp 150,000 Rp -
150,000.00 Rp 150,000 Rp - Rp - Rp 150,000 Rp -
200.00 Rp 220,000 Rp - Rp - Rp 220,000 Rp -
12,500.00 Rp 12,500 Rp - Rp - Rp 12,500 Rp -
47,500.00 Rp 95,000 Rp - Rp - Rp 95,000 Rp -
200.00 Rp 185,800 Rp - Rp - Rp 185,800 Rp -
3,500.00 Rp 42,000 Rp - Rp - Rp 42,000 Rp -
Sub Total C Rp 1,102,800 Rp - Rp - Rp 1,102,800 Rp -

80,000.00 Rp 400,000 Rp - Rp -Rp 400,000 Rp -


80,000.00 Rp 1,120,000 Rp - Rp -Rp 1,120,000 Rp -
80,000.00 Rp 1,920,000 Rp - Rp -Rp 1,920,000 Rp -
80,000.00 Rp 2,640,000 Rp - Rp -Rp 2,640,000 Rp -
Sub Total D Rp 6,080,000 Rp - Rp -Rp 6,080,000 Rp -
Total Rp 8,500,100 Rp - Rp -Rp 8,500,100 Rp -
Dibulatkan Rp 8,500,000 Rp - Rp - Rp 8,500,000 Rp -
Boalemo, Juni 2010
Dibuat Oleh
CF Pemberdayaan Satlak Pamsimas

Abdullah Said, S.Sos 0


RENCANA PENGGUNAAN DANA TERMIN I (APBD)

Kegiatan : Sarana Sanitasi Sekolah RPD Ke : 2

VOLUME
Real. s/d Pengajua Harga Satuan
NO URAIAN KEBUTU Jumlah Unit / Sat.
Tahap n (Rp)
HAN Kumulatif
Lalu Sekarang
A Jamban Sekolah
I APBN
a Bahan
Batu Bata 2,020.78 2,020.78 2,020.78 bh Rp 500
Batu Kali / Belah 2.22 2.22 2.22 m³ Rp 100,000
Besi Beton Polos 100.18 100.18 100.18 kg Rp 9,000
Cat Dasar Tembok 4.00 4.00 4.00 kg Rp 5,000
Cat Meni 0.46 0.46 0.46 kg Rp 20,000
Cat Tembok 10.40 10.40 10.40 kg Rp 16,000
Floor Drain 2.00 2.00 2.00 bh Rp 35,000
Kawat Beton Polos 2.20 2.20 2.20 kg Rp 20,000
Kayu Kls. II 0.27 0.27 0.27 m³ Rp 2,600,000
Kayu Kls. III 0.94 0.94 0.94 m³ Rp 1,750,000
Kerikil 0.92 0.92 0.92 m³ Rp 115,000
Kloset Jongkok 2.00 2.00 2.00 bh Rp 170,000
Paku Biasa 5.14 5.14 5.14 kg Rp 14,000
Paku seng 0.26 0.26 0.26 kg Rp 28,000
Plamir Kayu 0.35 0.35 0.35 kg Rp 20,000
Plamur Tembok 4.00 4.00 4.00 kg Rp 7,600
Pasir 4.70 4.70 4.70 m³ Rp 85,000
Semen PC 1,027.97 1,027.97 1,027.97 kg Rp 1,400
Seng BJLS .030 9.17 9.17 9.17 lmbr Rp 50,000
Tripleks 3 mm 3.25 3.25 3.25 lmbr Rp 45,000
Kaca Bening 3 mm 0.33 0.33 0.33 m2 Rp 100,000
Keramik 20x20 184.61 184.61 184.61 m2 Rp 2,680
Sub Total I
b Alat
Cangkul 1.00 1.00 1.00 bh Rp 50,000.00
Sekop 1.00 1.00 1.00 bh Rp 50,000.00
Linggis 1.00 - 1.00 1.00 bh Rp 35,000.00
Ember 1.00 - 1.00 1.00 bh Rp 15,000.00
Sub Total II
c Upah
Pekerja 38.87 - 38.87 38.87 Hok Rp 45,000.00
Tukang 33.53 33.53 33.53 Hok Rp 65,000.00
Sub Total III
Total Dana APBN + In-Cash
Jumlah (Rp)

Rp 1,010,392
Rp 221,550
Rp 901,631
Rp 19,998
Rp 9,240
Rp 166,379
Rp 70,000
Rp 43,943
Rp 694,330
Rp 1,644,525
Rp 105,826
Rp 340,000
Rp 71,952
Rp 7,333
Rp 6,930
Rp 30,396
Rp 399,275
Rp 1,439,158
Rp 458,301
Rp 146,180
Rp 33,000
Rp 494,755
Rp 8,315,091.68

Rp 50,000.00
Rp 50,000.00
Rp 35,000.00
Rp 15,000.00
Rp 150,000.00

Rp 1,749,257.83
Rp 2,179,732.74
Rp 3,928,990.57
Rp 12,394,100.00
DAFTAR RENCANA PENGADAAN BARANG DAN JASA

NO PAKET PEKERJAAN URAIAN MATERIAL VULUME SATUAN

Paket 1 PIPA DAN ASSESORIES: TRANSMISI DAN DISTIBUSI


1 Pengadaan
Pipa dan Assesoris Pipa PVC SNI 1,5" 1,517 M¹
Pipa PVC SNI 1 1/4" 840 M¹
Pipa PVC SNI 1" 420 M³
Asesoris
Pipa Gip 1½ 12 M"
Knee Ø 1½ " 4 buah
T Sock Ø 1½ " 4 buah
Knee PVC Ø 1 ¼ " (90⁰) 5 buah
Knee PVC Ø 1 " (90⁰) 6 buah
Knee PVC Ø ¾ " (90⁰) 7 buah
Knee PVC Ø 1¼" (45⁰) 4 buah
Oversock PVC Ø 1½"x 1¼ " 3 buah
Oversock PVC Ø 1¼"x 1 " 4 buah
Oversock PVC Ø 1"x ¾ " 6 buah
Oversock PVC Ø ¾"x ½ " 6 buah
T Sock PVC Ø 1½ " 4 buah
T Sock PVC Ø 1¼ " 5 buah
T Sock PVC Ø 1 " 5 buah
Knee PVC Ø 1½ " (90⁰) 6 buah
Knee GIP Ø 1½ " (90⁰) 6 buah
Knee GIP Ø 1¼ " (90⁰) 4 buah
Knee GIP Ø 1 " (90⁰) 4 buah
Sock Pipa PVC Ø 1½" 3 buah
Sock Pipa PVC Ø 1¼" 3 buah
Sock Pipa PVC Ø 1" 3 buah
Sock Pipa GIP Ø 1½" 3 buah
Sock Pipa GIP Ø 1¼" 3 buah
Sock Pipa GIP Ø 1" 3 buah
Lem Pipa @ 5 kg 1 Kaleng
TBA 5 Roll
DOP Pipa PVC Ø 1¼" 3 buah
2 PIPA DAN ASSESORIES: HIDRAN UMUM
Pipa Gip ǿ 1/2 12 ujung
Pipa Gip ǿ 3/4 9 ujung
Kran 1/2 ǿ 36 Bh
Seal Tape 2.43 Bh
Stop Kran 9.0 Bh
Knee 1/2" 18.0 Bh
T 3/4" 18.0 Bh
Sok Drat Luar 3/4" 1.0 Bh
Sok Drat Dalam 1/2" 1.0 Bh
Over Sok 3/4" x 1/2" 1.0 Bh
Pelampung Otomat 1.0 Bh
Lem 1.0 Kaleng
3 PIPA DAN ASSESORIES: BOR DALAM
Pipa PVC SNI S.12,5 Ø 4 inch (Casshing) 50 M'
Pipa PVC SNI S.12,5 Ø 1¼inch (Penghisap) 50 M'
Pipa PVC SNI S.12,5 Ø 1 inch (Penghisap) 50 M'
Pipa Gip 1,5 " 12 M'
Knee pipa PVC Ø 1" inch 5 M'
4 PIPA DAN ASSESORIES: WASTAFEL DAN WC SEKOLAH
Pipa PVC Dia. 3/4 31 m
TOTAL NILAI PEMAKETAN PIPA DAN ASSESORIES
NO PAKET PEKERJAAN URAIAN MATERIAL VULUME SATUAN

Paket 1
Pengadaan SEMEN DAN BESI : HIDRAN UMUM
2

Semen dan Besi Besi Beton Polos 1138.05 Kg


Paku Biasa 17.334 Kg
Semen PC 9483.03 kg
Ubin Warna 864 Bh
Semen Warna 65 Kg
Kawat Beton (Bendrat) 17.07075 Kg
2 SEMEN DAN BESI : MENARA AIR MINUM
Semen PC 178.2 kg
Beton Polos 79.2 Kg
Paku Biasa 1.824 Kg
Seng BJLS .030 6.30 Lbr
Paku seng 0.18 kg
Seng Plat BJLS 30 Kl 2.00 lbr
Plat Besi Tebal = 5 cm (50x50) 4.00 Buah
Angker Bout 20 cm ( tinggi 15 cm) 16.00 Buah
Kawat Beton 1.782 Kg
3 SEMEN DAN BESI : SUMUR GALI
Besi Beton 107.625 Kg
Kawat Beton (Bendrat) 2.53125 Kg
Semen 2114.9216625 Kg
4 SEMEN DAN BESI : WASTAFEL DAN WC SEKOLAH
Semen PC 12 Kg
Besi Beton Polos 100.18125 Kg
Kawat Beton Polos 2.197125 Kg
Semen PC 1,027.97 kg
Seng BJLS .030 9.17 lmbr
Tripleks 3 mm 3.25 lmbr
Kaca Bening 3 mm 0.33 m2
Keramik 20x20 184.61 m2
TOTAL NILAI PEMAKETAN SEMEN DAN BESI

NO PAKET PEKERJAAN URAIAN MATERIAL VULUME SATUAN

Paket 1
3 Pengadaan Jasa
Pengeboran
Bor Dalam Bor Dalam (40M) 40 M
NO PAKET PEKERJAAN URAIAN MATERIAL VULUME SATUAN

Paket 1
Pengadaan Jasa
Besi Siku dan Jasa Pekerjaannya
4
Pembuatan
Menara dan
Besi Siku Besi Siku 70.70.5 4 Ujung
Besi Siku 50.50.3 16 Ujung
Besi Siku 30.30.3 25 Ujung
Jasa Pekerjaan Menara 1 Buah

NO PAKET PEKERJAAN URAIAN MATERIAL VULUME SATUAN

Paket
Pengadaan 1
5 Bahan Buis Beton: Sumur Gali
Buis Beton Buis Beton 30 bh
BARANG DAN JASA

METODE WAKTU
HARGA JUMLAH BIAYA PENGADAAN PELAKSA
SATUAN (RP) NAAN

17,500 Rp 26,540,850.00 PELELANGAN TERMIN I


15,000 Rp 12,600,000.00
9,000 Rp 3,780,000.00
Rp -
35,000 Rp 420,000.00
14,025 Rp 56,100.00
14,025 Rp 56,100.00
11,739 Rp 58,695.00
11,739 Rp 70,434.00
9,452 Rp 66,164.00
11,739 Rp 46,956.00
11,739 Rp 35,217.00
11,739 Rp 46,956.00
11,739 Rp 70,434.00
10,214 Rp 61,284.00
11,739 Rp 46,956.00
11,739 Rp 58,695.00
9,452 Rp 47,260.00
9,452 Rp 56,712.00
20,866 Rp 125,196.00
24,698 Rp 98,792.00
17,602 Rp 70,408.00
14,025 Rp 42,075.00
11,739 Rp 35,217.00
11,739 Rp 35,217.00
24,698 Rp 74,094.00
20,866 Rp 62,598.00
17,602 Rp 52,806.00
325,000 Rp 325,000.00
8,000 Rp 40,000.00
11,739 Rp 35,217.00

94,000 Rp 1,128,000.00
105,000 Rp 945,000.00
25,000 Rp 900,000.00
4,000 Rp 9,720.00
60,000 Rp 540,000.00
3,500 Rp 63,000.00
3,500 Rp 63,000.00
4,000 Rp 4,000.00
4,000 Rp 4,000.00
3,600 Rp 3,600.00
100,000 Rp 100,000.00
35,000 Rp 35,000.00

72,000 Rp 3,600,000.00
16,750 Rp 837,500.00
9,000 Rp 450,000.00
35,000 Rp 420,000.00
3,500 Rp 17,500.00

8,750 Rp 269,500.00
Rp 54,505,253.00
METODE WAKTU
HARGA JUMLAH BIAYA PENGADAAN PELAKSA
SATUAN (RP) NAAN

SURVEY
PERBANDING
9,000 Rp 10,242,450.00 AN TERMIN I
9,000 Rp 156,006.00 HARGA
1,300 Rp 12,327,939.00
2,600 Rp 2,246,400.00
2,500 Rp 162,000.00
20,000 Rp 341,415.00

1,300 Rp 231,660.00
9,000 Rp 712,800.00
14,000 Rp 25,536.00
50,000 Rp 315,000.00
28,000 Rp 5,040.00
50,000 Rp 100,000.00
100,000 Rp 400,000.00
10,000 Rp 160,000.00
20,000 Rp 35,640.00

9,000 Rp 968,625.00
20,000 Rp 50,625.00
1,300 Rp 2,749,398.16

1,300 Rp 15,600.00
9,000 Rp 901,631.25
20,000 Rp 43,942.50
1,400 Rp 1,439,157.84
50,000 Rp 458,300.64
45,000 Rp 146,179.69
100,000 Rp 33,000.00
2,680 Rp 494,754.80
Rp 34,763,100.88

METODE WAKTU
HARGA JUMLAH BIAYA PENGADAAN PELAKSA
SATUAN (RP) NAAN

250,000 Rp 10,000,000.00 PELELANGAN TERMIN I


METODE WAKTU
HARGA JUMLAH BIAYA PENGADAAN PELAKSA
SATUAN (RP) NAAN

400,000 Rp 1,600,000.00 PELELANGAN TERMIN I


300,000 Rp 4,800,000.00
200,000 Rp 5,000,000.00
5,000,000 Rp 5,000,000.00
Rp 16,400,000.00

METODE WAKTU
HARGA JUMLAH BIAYA PENGADAAN PELAKSA
SATUAN (RP) NAAN

350,000 Rp 10,500,000.00 PELELANGAN TERMIN I


RENCANA KERJA PELAKSANAAN ( APBN +
Desa
Kecamatan
Jenis Pekerjaan : Sarana Air Minum, SAN, Kesehatan, Pemberdayaan

Bobot
No URAIAN Volume Satuan Oktober
(%) I II III
I Kegiatan Tahap I (APBN + IN-CASH)
1 Pek. Sumur Gali (3 Unit) 30,072,500.00 Rp 13.02 6.51 6.51
2 Promkes Masyarakat 2,068,500.00 Rp 0.90 0.448 0.448
3 Pekerjaan Hidran Umum ( 1 Unit) 6,145,900.00 Rp 2.66 2.66
II Kegiatan Tahap II (APBN+IN-CASH)
1 Pekerjaan Sumur Bor Dalam ( 1 Unit ) 26,827,000.00 Rp 11.61
2 Pekerjaan Menara (1 Unit) 24,769,300.00 Rp 10.72
3 Pekerjaan Jaringan Pipa 2.700 M 56,530,800.00 Rp 24.47
III Kegiatan Tahap III (APBN+ INCASH)
1 Pekerjaan Hidran Umum ( 9 Unit) 49,166,900.00 Rp 21.28
2 Pekerjaan Rumah Pompa 135,300.00 Rp 0.06
3 Promkes Masyarakat dan Sekolah 3,283,800.00 Rp 1.42
4 Pelatihan BPS 4,500,000.00 Rp 1.95

IV Kegiatan Tahap IV (APBD)


1 Sarana Sanitasi (Wastafel) 2,106,000.00 Rp 0.91 0.91
2 Sarana Sanitasi (WC Sekolah) 12,394,000.00 Rp 5.37 2.68 2.68
3 Pelatihan LKM 4,500,000.00 Rp 1.95 1.95
4 BOP LKM 8,500,000.00 Rp 3.68 0.33 0.33

Jumlah ### 100.00


Rencana Kemajuan Pek. Mingguan - 8.46 13.55 3.46
Kumulatif Rencana Kemajuan Pek.Mingguan - 8.46 22.00 25.47
Realisasi Kemajuan Pek. Mingguan
Kumulatif Realisasi Kemajuan Pek.Mingguan
ELAKSANAAN ( APBN + IN-CASH)

JADWAL WAKTU PELAKSANAAN


tober November Desember Ket.
IV I II III IV I II III IV
100

5.81 5.81
10.72
12.24 12.24

3.55 3.55 3.55 3.55 3.55 3.55


50
0.06
0.47 0.47 0.47
1.95
-

0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33


0

18.38 29.10 3.94 4.36 4.36 4.36 3.88 5.83 0.33


43.85 72.95 76.89 81.24 85.60 89.95 93.84 99.67 100.00
100
27,785,000
15,158,800
90,772,200
7,339,900
141,055,900