Wilayah 1 hal 1
BARDOLINE Beaver Bitumen 0,30 mm m2 175,000
Batu Gunung 15/20 m3 171,500
Batu Pecah 2/3 m3 411,500
Pasir Pasang Jawa m3 400,000
Sirtu m3 240,000
Portland Cement (PC) kg 1,600
Portland Cement (PC) - 40 kg sak 62,400
Pasir Beton m3 542,000
Keramik Lantai Unpolished 40x40 cm bh 10,000
Keramik Lantai 20x20 cm bh 3,500
Keramik Dinding 25x40 cm bh 7,500
Keramik Dinding 20x25 cm bh 4,500
Glass Block bh 30,000
Kaca tebal 5 mm m2 135,000
Kunci slot bh 45,000
Elbow 90 Ukuran (2") bh 27,500
Pipa Galvanis Diameter 1,5" m 50,000
Pipa Galvanis Diameter 1" m 38,000
Pipa PVC ø 2 inch - AW m 41,000
Pipa PVC ø 1,5 inch - AW m 23,000
Pipa PVC ø 3/4 inch - AW m 10,000
Lem Isarplas 300 gram kaleng 50,000
Pipa Screen ø 3 inch m 450,000
Pipa PVC ø 3 inch - AW m 85,000
Pipa PVC ø 4 inch - AW m 135,000
Pipa PVC ø 6 inch - AW m 250,000
Kabel power pompa NYY 3 x 4 mm m 35,000
Watermoor PVC Ø 2" buah 152,000
ALAT
Mesin Bor / Rig + Perlengkapan jam 40,000
Borehole Ø 4 inch m 85,000
Reaming Ø 6 inch m 35,000
Mesin Las jam 72,000
Molen kapasitas 0,3 M3 hari 455,000
UPAH
Pekerja org/hari 120,000
Tukang Batu org/hari 130,000
Tukang Besi org/hari 130,000
Tukang Cat org/hari 130,000
Tukang Kayu org/hari 130,000
Tukang Pipa org/hari 130,000
Wilayah 1 hal 2
Tukang Bor org/hari 130,000
Tukang Listrik org/hari 130,000
Tukang Las org/hari 130,000
harga satuan di atas sudah termasuk PPN
Wilayah 1 hal 3
Spesifikasi
Wilayah 1 hal 4
Batu Belah 15/20
Koral Beton
Semen Indonesia
Semen Indonesia
Wilayah 1 hal 5
Wilayah 1 hal 6
DAFTAR HARGA UPAH, BAHAN DAN ALAT
KECAMATAN ROBATAL
TAHUN 2018
B. HARGA MATERIAL
PPn + PPh
NO. NAMA MATERIAL SATUAN HARGA MATERIAL
11.5%
kg Rp 1,400.00 Rp 161.00
Portland Cement (PC)
sak
m Rp 9,300.00 Rp 1,069.50
Besi Beton Polos Ø 12 mm
lonjor
m Rp 5,600.00 Rp 644.00
Besi Beton Polos Ø 10 mm
lonjor
m Rp 3,900.00 Rp 448.50
Besi Beton Polos Ø 8 mm
lonjor
Rp 215,000.00 Rp 183,000.00
Rp 410,000.00 Rp 233,000.00
Rp 400,000.00
Rp 542,000.00 Rp 365,000.00
Rp 129,000.00 Rp 122,000.00
Rp 1,100.00 Rp 700.00
Rp 1,600.00
Rp 64,000.00 Rp 53,500.00
Rp 10,000.00
Rp 120,000.00 Rp 126,000.00
Rp 6,300.00
Rp 75,600.00 Rp 73,000.00
Rp 5,000.00
Rp 60,000.00 Rp 56,000.00
Rp 24,000.00
Rp 225,000.00 Rp 225,000.00
Rp 5,787,000.00 Rp 5,793,000.00
Rp 5,620,000.00 Rp 5,624,000.00
Rp 24,000.00 Rp 18,000.00
Rp 9,000.00
TAKE OF SHEET PEKERJAAN
V H
UKURAN BANGUNAN = 19.2 x 37.3 Pembersihan V = 6.00 x 12.0 =
Ø 12 = 0.88 x 57.6 =
Ø 12 = 0.88 x 53 =
Ø 10 = 0.61 x 183.4 =
Ø 10 = 0.61 x 308 =
Ø 12 = 0.88 x 192.0 =
Ø 12 = 0.88 x 74.2 =
Ø 10 = 0.61 x 0 =
Ø 10 = 0.61 x 189 =
Ø 10 = 0.61 x 69.2 =
Ø8 = 0.39 x 63.9 =
Ø8 = 0.39 x 214.2 =
Ø8 = 0.39 x 232.3 =
Kolom 2 = 40 x 1.0 x 4 = 160.0 m
= 13.33 Lonjor
Ø8 = 0.39 x 160.0 =
Ø8 = 0.39 x 69.6 =
BEKISTING
Sloof 1 = 0.70 x 10.6 =
Sloof 2 = 0.55 x 45.9 =
Wuwung Nok =
Pengecatan Dinding =
Sanitair Closet = =
Washtafel = =
Floor Drain = =
Kran air = =
Septic Tank = 2.50 / 0.50 =
Resapan = 2.50 / 0.50 x 2 =
PERHITUNGAN VOLUME
72 72.00 m2
27.6605 29.10 m3
1.44
0
0
12.9828 17.64 m3
2.772
1.89
0.1152 0.12 m3
7.903 7.90 m3
15.2415 15.69 m3
0.45
0.17 6.75 m3
0.53
1.38
0.93
1.50
1.06
0.00
0.79
0.39
1077.47 kg
Lonjor
50.688 kg
Lonjor
46.6 kg
Lonjor
111.9 kg
Lonjor
187.88 kg
Lonjor
168.96 kg
Lonjor
65.3 kg
Lonjor
0.0 kg
Lonjor
115.3 kg
Lonjor
42.2 kg
Lonjor
24.9 kg
Lonjor
83.5 kg
Lonjor
90.6 kg
Lonjor
62.4 kg
Lonjor
27.1 kg
7.42 32.64 m2
25.2175
16.94 40.94 m2
24
7.42 7.42 m2
0.00
6.6 6.60 m2
188.825 190.77 m2
10.38
0.64
1.04
6.76
228.9199 228.92 m2
8.32 0.20 m3
19.76
0.202176 m3
5.6 5.6 m2
0.6 0.6 m2
45.18
6.8
13.20
24.00 63.60 m2
39.60
19.85 0.14 m3
0.14
38.00 0.58 m3
18.00
15.20
9.50
0.58
67.06 115.04 m2
19.17
20.22
8.59
9.50 9.50 m
32.76 68.94 m
13.26
20.52
2.40
228.92 228.92 m2
53.46 64.26 m2
10.80
11
7
3
5
2
1
2
4
5 15.00 bh
10
35
10
10
4.47 4.47 m2
ANALISA GEDUNG TA. 2019
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
1 m2 Bekisting kolom beton biasa menggunakan multiflex 12mm atau 18 mm, (TP)
1 m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm, tinggi 4 m, JAT < 1,0m
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
1 m2 Bekisting balok beton biasa menggunakan multiflex 12 mm atau 18 mm, JAT < 1,0m
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
1 m2 perancah bekisting balok menggunakan Kaso 5/7, tinggi 4 m dan JAT < 1,0 m
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
1 m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT < 60 cm
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Pemasangan 1 m2 acian.
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Satuan Koef Harga Sat. Volume
TENAGA KERJA
Pekerja OH 0.8000 120,000 -
Tukang Kayu OH 2.4000 130,000 -
BAHAN
Papan Kayu Meranti 3/20 m3 0.0240 10,000,000 -
Lem Kayu Kg 0.3000 35,000 -
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm
Satuan Koef Harga Sat. Volume
TENAGA KERJA
Pekerja OH 0,70 120,000 9.2400
Tukang Batu OH 0,35 130,000 4.6200
BAHAN
Keramik Lantai 20x20 cm Bh 26,50 3,500 #VALUE!
Portland Cement (PC) Kg 10,40 1,600 #VALUE!
Pasir Pasang Jawa M3 0,045 400,000 594.0000
Semen Warna Kg 1,62 24,000 #VALUE!
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Satuan Koef Harga Sat. Volume
TENAGA KERJA
Pekerja OH 4.000 120,000 0.5717
Tukang kayu OH 12.000 130,000 1.7150
BAHAN
Kayu Gelam 6/12 m3 1.10 4,440,000 0.1572
Besi Strip Tebal 5mm kg 15.00 15,000 2.1438
Paku 12 cm kg 5.60 24,000 0.8004
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Satuan Koef Harga Sat. Volume
TENAGA KERJA
Pekerja OH 0,150 120,000 -
Tukang kayu OH 0,300 130,000 -
BAHAN
Kayu Gelam 5/7 m3 0,0154 4,080,000 #VALUE!
Paku 7 - 10 cm kg 0,200 24,000 -
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Pengecatan 1 m2 tembok baru (1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Satuan Koef Harga Sat. Volume
TENAGA KERJA
Pekerja OH 0,02 120,000 4.5784
Tukang Cat OH 0,063 130,000 14,421.9550
BAHAN
Plamur Tembok Kg 0.1000 24,000 22.8920
Cat Tembok Decolith Kg 0.1000 19,000 22.8920
Cat Tembok Decolith Kg 0.2600 19,000 59.5192
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Satuan Koef Harga Sat. Volume
TENAGA KERJA
Pekerja OH 0,07 120,000 -
Tukang Cat OH 0,009 130,000 -
BAHAN
Plamur Kayu Kg 0,15 34,000 #VALUE!
Cat Kayu Emco Kg 0,17 73,000 #VALUE!
Cat Kayu Emco Kg 0,26 73,000 #VALUE!
Cat Menie Kayu Pedang Kg 0,20 36,000 #VALUE!
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
Jumlah (Tenaga+Bahan+Peralatan)
Overhead & Profit (Maksimal 15%) % -
Total Harga Pekerjaan
ALISA GEDUNG TA. 2019
29.10 M3
Total harga
2,619,045.00
2,619,045.00
-
2,619,045.00
72.00 M2
Total harga
864,000.00
864,000.00
-
864,000.00
7.28 M3
Total harga
218,253.75
218,253.75
-
218,253.75
M3
Total harga
-
-
-
-
17.64 M3
Total harga
529,344.00
5,081,702.40
5,611,046.40
-
5,611,046.40
0.12 M3
Total harga
16,588.80
2,995.20
42,393.60
39,826.78
27,047.07
2,304.00
131,155.45
-
131,155.45
7.90 M3
Total harga
739,720.80
400,682.10
1,626,437.40
-
2,766,840.30
-
2,766,840.30
15.69 M3
Total harga
2,824,470.00
1,529,921.25
4,092,343.20
3,263,832.00
3,229,310.70
14,939,877.15
-
14,939,877.15
6.75 M3
Total harga
1,071,828.45
165,878.21
3,521,452.00
1,986,410.64
1,588,169.68
145,151.88
767,954.69
9,246,845.54
-
9,246,845.54
1,077.47 KG
Total harga
905,076.65
980,499.70
-
562,440.49
2,448,016.84
-
2,448,016.84
32.64 M2
Total harga
783,300.00
424,287.50
939,960.00
798,966.00
195,825.00
58,747.50
3,201,086.00
-
3,201,086.00
40.94 M2
Total harga
1,080,816.00
585,442.00
1,179,072.00
835,176.00
245,640.00
73,692.00
3,999,838.00
-
3,999,838.00
40.94 M2
Total harga
1,670,352.00
904,774.00
235,814.40
1,837,387.20
4,648,327.60
-
4,648,327.60
7.42 M2
Total harga
213,696.00
115,752.00
213,696.00
151,368.00
44,520.00
13,356.00
752,388.00
-
752,388.00
7.42 M2
Total harga
320,544.00
173,628.00
42,739.20
333,009.60
869,920.80
-
869,920.80
6.60 M2
Total harga
158,400.00
85,800.00
190,080.00
134,640.00
34,848.00
11,880.00
615,648.00
-
615,648.00
6.60 M2
Total harga
237,600.00
128,700.00
39,600.00
350,064.00
755,964.00
-
755,964.00
190.77 M2
Total harga
13,735,195.20
4,959,931.60
8,103,765.17
7,096,517.52
13,735,195.20
47,630,604.69
-
47,630,604.69
228.920 M2
Total harga
8,241,117.12
4,463,938.44
2,285,536.48
2,197,631.23
17,188,223.27
-
17,188,223.27
228.920 M2
Total harga
5,494,078.08
2,975,958.96
1,190,383.58
9,660,420.62
-
9,660,420.62
0.202 M3
Total harga
145,566.72
473,091.84
2,741,506.56
6,065.28
7,076.16
3,373,306.56
-
3,373,306.56
5.600 M2
Total harga
672,000.00
2,184,000.00
2,240,000.00
98,000.00
5,194,000.00
-
5,194,000.00
M2
Total harga
-
-
-
-
-
-
-
0.600 M2
Total harga
1,080.00
11,700.00
89,100.00
510.00
102,390.00
-
102,390.00
45.180 M2
Total harga
3,795,120.00
2,055,690.00
3,162,600.00
#VALUE!
813,240,000.00
#VALUE!
12,175,287.12
-
12,175,287.12
6.800 M2
Total harga
571,200.00
309,400.00
476,000.00
#VALUE!
122,400,000.00
#VALUE!
1,832,491.20
-
1,832,491.20
13.200 M2
Total harga
1,108,800.00
600,600.00
#VALUE!
#VALUE!
237,600,000.00
#VALUE!
3,904,164.00
-
3,904,164.00
63.600 M2
Total harga
5,342,400.00
2,893,800.00
4,770,000.00
1,058,304.00
1,144,800.00
2,472,768.00
17,682,072.00
-
17,682,072.00
M2
Total harga
-
-
-
#VALUE!
-
#VALUE!
-
-
-
0.143 M2
Total harga
68,601.60
222,955.20
698,021.28
32,157.00
19,208.45
1,040,943.53
-
1,040,943.53
0.581 M2
Total harga
467,156.16
1,518,257.52
2,837,799.36
130,734.00
41,834.88
4,995,781.92
-
4,995,781.92
115.042 M2
Total harga
1,380,504.00
1,495,546.00
6,571,199,040.00
16,897,368,960.00
690,252,000.00
27,034,870.00
-
27,034,870.00
115.04 m2
Total harga
276,100.80
1,196,436.80
11,389,158.00
414,151.20
69,025.20
13,344,872.00
-
13,344,872.00
9.50 m
Total harga
22,800.00
98,800.00
365,750.00
17,100.00
504,450.00
-
504,450.00
M2
Total harga
-
-
-
-
-
M
Total harga
-
-
-
#VALUE!
-
-
-
-
68.940 M
Total harga
827,280.00
1,792,440.00
3,367,029,600.00
82,728,000.00
6,069,477.60
-
6,069,477.60
M
Total harga
-
-
#VALUE!
-
-
-
-
M
Total harga
-
-
-
-
-
-
-
M
Total harga
-
-
-
-
-
-
-
228.920 M2
Total harga
549,407.81
1,874,854,144.80
549,407.81
434,947.85
1,130,864.40
4,539,482.01
-
4,539,482.01
M2
Total harga
-
-
#VALUE!
#VALUE!
#VALUE!
#VALUE!
-
-
-
bh
Total harga
-
-
#VALUE!
-
-
-
bh
Total harga
-
-
-
-
-
bh
Total harga
-
-
-
-
-
bh
Total harga
-
-
-
-
-
bh
Total harga
-
-
-
-
-
ttk
Total harga
-
-
-
-
-
-
-
-
-
ttk
Total harga
-
-
-
-
-
-
-
-
-
-
-
-
-
ttk
Total harga
-
-
-
-
-
ttk
Total harga
-
-
-
-
-
ttk
Total harga
-
-
-
#VALUE!
#VALUE!
-
-
-
ttk
Total harga
-
-
#VALUE!
#VALUE!
#VALUE!
-
-
-
ttk
Total harga
-
-
-
-
-
ttk
Total harga
-
-
-
-
-
-
-
m
Total harga
-
-
-
-
-
m
Total harga
-
-
-
-
-
m
Total harga
-
-
-
-
-
M2
Total harga
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
( RAB )
HARGA SATUAN
NO URAIAN SATUAN VOLUME
(Rp)
I UPAH
Pekerja OH 475.00 120,000.00
Tukang Batu OH 157.00 130,000.00
Tukang Kayu OH 88.00 130,000.00
Tukang Besi OH 8.00 130,000.00
Tukang Cat OH 15.00 130,000.00
Tukang Listrik OH - 130,000.00
SUBTOTAL UPAH
II BAHAN
Batu Gunung 15/20 m3 28.00 171,500.00
Batu Pecah 2/3 m3 4.00 411,500.00
Pasir Pasang Jawa m3 37.00 400,000.00
Pasir Beton m3 4.00 542,000.00
Sirtu m3 21.00 240,000.00
Portland Cement (PC) Zak 331.00 62,400.00
Batu Bata Putih Buah ### 800.00
Besi Beton Polos Ø 12 mm Lonjor 35.00 104,900.00
Besi Beton Polos Ø 10 mm Lonjor 70.00 72,600.00
Besi Beton Polos Ø 8 mm Lonjor 69.00 49,800.00
Kawat Beton Kg 16.00 34,800.00
Air Liter 1,475.00 100.00
Multiplek Tebal 12 mm x 1,2 x 2,4 Lembar 11.00 225,000.00
Kayu Meranti 6/12 m3 0.20 11,300,000.00
Papan Kayu Meranti 3/20 m3 0.20 10,000,000.00
Kayu Gelam 6/12 m3 0.80 4,440,000.00
Kayu Gelam 5/7 m3 2.70 4,080,000.00
Kayu Gelam 2/3 m3 4.10 4,080,000.00
Papan Kayu Gelam 2/20 m3 0.80 4,440,000.00
Besi Strip Tebal 5mm Kg 11.00 15,000.00
Paku 12 cm Kg 3.00 24,000.00
Paku 5 - 10 cm Kg 29.00 24,000.00
Paku 5 - 7 cm Kg 39.00 24,000.00
Semen Warna Kg 209.00 24,000.00
Keramik Lantai Unpolished 40x40 cm Buah 316.00 10,000.00
Keramik Lantai Motif Kayu 40x40 cm Buah 48.00 10,000.00
Keramik Lantai 20x20 cm Buah 350.00 3,500.00
Keramik Dinding 25x40 cm Buah 636.00 7,500.00
Batu Koral Sikat Zak 10.00 75,000.00
Onduline Bitumen 0,3 mm m2 127.00 90,000.00
Bubung Onduline 0,30 mm m2 10.00 35,000.00
Screw Cteks 12 x 50 mm Buah 690.00 600.00
Screw Cteks 10 x 16 mm Buah 287.00 300.00
Glass Block Buah 16.00 30,000.00
Kaca Tebal 5 mm m2 1.00 135,000.00
Lem Kayu Kg 3.00 35,000.00
Sealant Kg 1.00 17,000.00
Plamur Tembok Kg 23.00 24,000.00
Cat Tembok Decolith Kg 82.00 19,000.00
Minyak Bekisting Liter 18.00 9,000.00
Dinding Bambu Awetan + Frame m2 64.26 100,000.00
Closet Jongkok Unit 4.00 190,000.00
Shower Air Paket 12.00 500,000.00
Benang nilon Roll 4.00 8,000.00
Prasasti Buah 1.00 500,000.00
Papan Proyek Buah 1.00 300,000.00
SUBTOTAL BAHAN
III ALAT
Molen Kapasitas 0,3 m3 Sewa-Hari 2.00 455,000.00
SUBTOTAL ALAT
Terbilang Dua Ratus Lima Puluh Enam Juta Enam Ratus Empat Puluh Sembilan Ribu Tujuh Ratus R
Catatan :
- Harga satuan bahan / material sudah termasuk hitungan pajak (PPN dan PPh)
NAGASAREH
Mengetahui,
Kepala Desa
MASURI
ANA ANGGARAN BIAYA
( RAB )
GEDUNG POLINDES
PEMBANGUNAN DESA
DANA DESA
1 UNIT
JUMLAH HARGA
(Rp)
57,000,000.00
20,410,000.00
11,440,000.00
1,040,000.00
1,950,000.00
-
91,840,000.00
4,802,000.00
1,646,000.00
14,800,000.00
2,168,000.00
5,040,000.00
20,654,400.00
13,735,200.00
3,671,500.00
5,082,000.00
3,436,200.00
556,800.00
147,500.00
2,475,000.00
2,260,000.00
2,000,000.00
3,552,000.00
11,016,000.00
16,728,000.00
3,552,000.00
165,000.00
72,000.00
696,000.00
936,000.00
5,016,000.00
3,160,000.00
480,000.00
1,225,000.00
4,770,000.00
750,000.00
11,430,000.00
350,000.00
414,000.00
86,100.00
480,000.00
135,000.00
105,000.00
17,000.00
552,000.00
1,558,000.00
162,000.00
6,426,000.00
760,000.00
6,000,000.00
32,000.00
500,000.00
300,000.00
163,899,700.00
910,000.00
910,000.00
-
256,649,700.00
uta Enam Ratus Empat Puluh Sembilan Ribu Tujuh Ratus Rupiah
, ………….....… 2019
Dibuat Oleh,
Pelaksana Kegiatan
SAHWARI
REKAPITULASI
RENCANA ANGGARAN BIAYA
A UPAH 9
B BAHAN
C ALAT
D HONOR TPK
TOTAL BIAYA Rp 25
Terbilang Dua Ratus Lima Puluh Enam Juta Enam Ratus Empat Puluh Sembilan Ribu Tujuh Ratus Rupiah
NAGASAREH
Mengetahui,
Kepala Desa
MASURI
REKAPITULASI
ENCANA ANGGARAN BIAYA
GEDUNG POLINDES
PEMBANGUNAN DESA
DANA DESA
1 UNIT
TOTAL HARGA
91,840,000
163,899,700
910,000
Rp 256,649,700
am Juta Enam Ratus Empat Puluh Sembilan Ribu Tujuh Ratus Rupiah
, ………….....… 2019
Dibuat Oleh,
Pelaksana Kegiatan
SAHWARI
JADWAL PELAKSANAAN KEGIATAN
3 Pek. Pondasi
6 Pek. Atap
7 Pek. Plafond
8 Pek. Lantai
9 Pek. Sanitasi
10 Pek. Finishing
NAGASAREH , ………….....… 2019
Mengetahui, Dibuat Oleh,
Kepala Desa Pelaksana Kegiatan
MASURI SAHWARI
RENCANA ANGGARAN BIAYA
OPERASIONAL TPK
HARGA SATUAN
NO URAIAN VOLUME SAT
(Rp)
Biaya ATK
- Materai 6000 10.00 bh 6,000
- Materai 3000 7.00 bh 3,000
- Buku tulis 38 lbr 1.00 bh 5,000
- Kertas HVS 70 gram 1.00 rim 45,000
- Kertas Cover 1.00 rim 40,000
- Kertas Plano A2 1.00 rol 150,000
- Ballpoint 5.00 bh 5,000
- Spidol Marker 1.00 bh 10,000
- Tinta Spidol Marker 1.00 bh 25,000
- Penggaris 1.00 bh 5,000
- Lem Kertas Besar 1.00 bh 8,000
- Stopmap Mika 7.00 bh 7,000
- Stopmap Kertas 7.00 bh 1,000
- Buku kwitansi 1.00 bh 6,000
- Stapler Besar 1.00 bh 35,000
- Stapler Kecil 1.00 bh 15,000
- Isi Stapler Besar 1.00 bh 15,000
- Isi Stapler Kecil 1.00 bh 5,000
- Tinta Printer (Warna Hitam) 1.00 bh 150,000
- Binder Clips 107 2.00 dos 8,000
- Binder Clips 200 1.00 dos 20,000
SUBTOTAL BIAYA ATK
Biaya Cetak dan Penggandaan
- Fotocopy 500.00 lbr 150
- Penjilidan 16.00 buku 3,000
SUBTOTAL BIAYA CETAK DAN PENGGANDAAN
Biaya Pengukuran (Survey Data Pekerjaan)
- Cat Semprot (Pylox) 1.00 bh 30,000
- Patok (Kayu Usuk) 6.00 batang 38,000
TOTAL BIAYA
#REF!
Mengetahui,
#REF!
#REF!
GEDUNG POLINDES
PEMBANGUNAN DESA
DANA DESA
1 UNIT
TOTAL HARGA
(Rp)
60,000
21,000
5,000
45,000
40,000
150,000
25,000
10,000
25,000
5,000
8,000
49,000
7,000
6,000
35,000
15,000
15,000
5,000
150,000
16,000
20,000
712,000
75,000
48,000
123,000
30,000
228,000
258,000
Rp 1,093,000
, ………….....… 2018
Dibuat Oleh,
Pelaksana Kegiatan
#REF!
RENCANA ANGGARAN BIAYA
OPERASIONAL TPK
Biaya ATK
- Materai 6000 16.00 bh 6,000
- Materai 3000 9.00 bh 3,000
- Buku tulis 38 lbr 1.00 bh 5,000
- Kertas HVS 70 gram 2.00 rim 45,000
- Kertas Cover 1.00 rim 40,000
- Kertas Plano A2 1.00 rol 150,000
- Ballpoint 8.00 bh 5,000
- Spidol Marker 1.00 bh 10,000
- Tinta Spidol Marker 1.00 bh 25,000
- Penggaris 1.00 bh 5,000
- Lem Kertas Besar 2.00 bh 8,000
- Stopmap Mika 7.00 bh 7,000
- Stopmap Kertas 7.00 bh 1,000
- Buku kwitansi 2.00 bh 6,000
- Stapler Besar 1.00 bh 35,000
- Stapler Kecil 1.00 bh 15,000
- Isi Stapler Besar 2.00 bh 15,000
- Isi Stapler Kecil 2.00 bh 5,000
- Tinta Printer (Warna Hitam) 1.00 bh 150,000
- Binder Clips 107 3.00 dos 8,000
- Binder Clips 200 3.00 dos 20,000
SUBTOTAL BIAYA ATK
Biaya Cetak dan Penggandaan
- Fotocopy ### lbr 150.00
- Penjilidan 16.00 buku 3,000.00
SUBTOTAL BIAYA CETAK DAN PENGGANDAAN
Biaya Pengukuran (Survey Data Pekerjaan)
- Cat Semprot (Pylox) 1.00 bh 30,000.00
- Patok (Kayu Usuk) 10.00 batang 38,000.00
TOTAL BIAYA
Terbilang : Enam Ratus Empat Puluh Delapan Ribu Rupiah
#REF!
Mengetahui,
#REF!
#REF!
GEDUNG POLINDES
PEMBANGUNAN DESA
DANA DESA
1 UNIT
TOTAL HARGA
96,000
27,000
5,000
90,000
40,000
150,000
40,000
10,000
25,000
5,000
16,000
49,000
7,000
12,000
35,000
15,000
30,000
10,000
150,000
24,000
60,000
896,000
150,000
48,000
198,000
Rp 30,000
Rp 380,000
410,000
Rp 1,504,000
, ………….....… 2018
Dibuat Oleh,
Pelaksana Kegiatan
#REF!
RENCANA ANGGARAN BIAYA
OPERASIONAL TPK
Biaya ATK
- Materai 6000 20.00 bh 6,000
- Materai 3000 12.00 bh 3,000
- Buku tulis 38 lbr 1.00 bh 5,000
- Kertas HVS 70 gram 2.00 rim 45,000
- Kertas Cover 1.00 rim 40,000
- Kertas Plano A2 1.00 rol 150,000
- Ballpoint 10.00 bh 5,000
- Spidol Marker 1.00 bh 10,000
- Tinta Spidol Marker 1.00 bh 25,000
- Penggaris 1.00 bh 5,000
- Lem Kertas Besar 3.00 bh 8,000
- Stopmap Mika 7.00 bh 7,000
- Stopmap Kertas 7.00 bh 1,000
- Buku kwitansi 3.00 bh 6,000
- Stapler Besar 1.00 bh 35,000
- Stapler Kecil 1.00 bh 15,000
- Isi Stapler Besar 3.00 bh 15,000
- Isi Stapler Kecil 2.00 bh 5,000
- Tinta Printer (Warna Hitam) 1.00 bh 150,000
- Binder Clips 107 3.00 dos 8,000
- Binder Clips 200 3.00 dos 20,000
SUBTOTAL BIAYA ATK
Biaya Cetak dan Penggandaan
- Fotocopy ### lbr 150
- Penjilidan 16.00 buku 3,000
SUBTOTAL BIAYA CETAK DAN PENGGANDAAN
Biaya Pengukuran (Survey Data Pekerjaan)
- Cat Semprot (Pylox) 1.00 bh 30,000
- Patok (Kayu Usuk) 18.00 batang 38,000
TOTAL BIAYA
Terbilang : Enam Ratus Empat Puluh Delapan Ribu Rupiah
#REF!
Mengetahui,
#REF!
#REF!
GEDUNG POLINDES
PEMBANGUNAN DESA
DANA DESA
1 UNIT
TOTAL HARGA
120,000
36,000
5,000
90,000
40,000
150,000
50,000
10,000
25,000
5,000
24,000
49,000
7,000
18,000
35,000
15,000
45,000
10,000
150,000
24,000
60,000
968,000
180,000
48,000
228,000
30,000
684,000
714,000
Rp 1,910,000
, ………….....… 2018
Dibuat Oleh,
Pelaksana Kegiatan
#REF!