KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN
:
:
:
:
NO.
URAIAN PEKERJAAN
PEK. PERSIAPAN
II
III
PEK. JEMBATAN
IV
PEK. PELENGKAP
JUMLAH
7,730,840.75
773,084.07
8,503,924.82
8,503,000.00
JUMLAH
PPN 10 %
JUMLAH TOTAL
DIBULATKAN
TERBILANG : LIMA PULUH JUTA RUPIAH
Tasikmlaya,
Penawar
Direktur
KODE
ANALIS
VOLUME
SAT
HARGA SAT
PEK. PERSIAPAN
1
2
3
4
Pengukuran/uitzet
Papan nama proyek
Pengadaan/ Sewa Direksikeet
Administrasi. Dokumentasi
Ls
Ls
Ls
Ls
1.00
1.00
1.00
1.00
Ls
Ls
Ls
Ls
300,000.00
250,000.00
350,000.00
350,000.00
K.618
495.58
M2
62,875.42
B-02
B-09
C-04
G-01
G46 A
G45 B
G46 C
DIHITUNG
6.55
1.31
5.46
0.52
1.95
1.17
0.20
22.50
M3
M3
M3
M3
M3
M3
M3
M1
19,703.20
7,192.90
441,683.00
507,919.50
1,489,543.18
3,133,856.82
4,698,231.55
75,543.77
JUMLAH
II
III
1
2
3
4
5
6
7
8
PEK. JEMBATAN
Galian Tanah
Urugan Kembali
Pas. Batu Kali 1 : 3
Pas. Poor Beton (Dudukan Jembatan)
Pas. Balok 40/65
Plat Jembatan T=20 cm
Kolom 20/20
Pipa Galvanis 2"
2008
JUMLAH
IV
PEK. PELENGKAP
1 Pek. Plat decker t= 10 cm
2 Pek. Rabat Beton t = 10 cm
3 Pek. Batu Kali tangga Jembatan
JUMLAH
G45 B
G-01
C-04
0.53
0.88
1.79
4,407,846.28
507,919.50
441,683.00
laya,
JUMLAH
1,250,000.00
6,480,840.75
7,730,840.75
773,084.07
8,503,924.82
8,503,000.00
50000000
41,497,000.00
37,724,545.45
2008
37750
JUMLAH
300,000.00
250,000.00
350,000.00
350,000.00
1,250,000.00
2.35
0.35
129,095.37
9,425.58
2,411,589.18
264,118.14
3,666,612.49
12.03774
3.4875
6,480,840.75
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Pekerja
Pekerja (setengah terampil )
Pekerja ( terampil )
Tukang Gali
Tukang Batu ( setengah terampil )
Tukang Batu ( terampil )
Kepala Tukang Batu
Tukang Kayu ( setengah terampil )
Tukang Kayu ( terampil )
Kepala Tukang Kayu
Tukang Cat / Plitur ( setengah terampil )
Tukang Cat / Plitur ( terampil )
Kepala Tukang Cat / Plitur
Tukang Besi Beton ( setengah terampil )
Tukang Besi Beton ( terampil )
Kepala Tukang Besi Beton
Tukang Besi Frofil ( setengah terampil )
Tukang Besi Frofil ( terampil )
Kepala Tukang Besi Frofil
Mandor
Operator Alat Besar
Pembantu Operator / Mekanik
Supir Truk
Kenek Truk / Pembantu Supir Truk
Penjaga Malam
SATUAN
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
UPAH 2008
( Rp )
27,500
29,000
30,000
33,000
30,000
36,000
39,500
33,000
39,500
39,500
27,500
33,000
39,500
38,500
38,500
38,500
33,000
38,500
39,500
38,500
39,500
36,000
33,000
27,500
27,500
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
1
2
3
4
5
6
7
SATUAN
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
Zak
Zak
Kg
m3
m3
Pengecoran/ Hari
< 20 m3/M3
<100 m3
Penambahan lebih dari 100 M3
Kg
ton
ton
ton
ton
liter
m3
HARGA 2008
( Rp )
108,500
30,000
72,500
57,000
84,500
78,000
99,500
69,500
121,000
130,000
138,000
128,000
122,000
85,000
75,000
56,500
850
2,500
2,000
2,000
1,500
300
3,000
4,500
3,500
4,000
29,000
31,000
38,000
41,000
44,000
28,000
56,000
31,000
48,000
35,000
61,000
38,000
25,000
26,000
4,000
17,000
23,000
18,000
44,000
71,000
7,000
616,000
577,000
165,000
110,000
1,650,000
16,000
5,700
690,000
767,000
684,000
2,500
88,000
No
SATUAN
HARGA 2008
( Rp )
-
No
SATUAN
HARGA 2008
( Rp )
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Kg
Kg
Kg
m2
m2
m2
Kg
m2
m2
Bh
Kg
m'
m2
m2
Kg
Kg
Kg
Kg
Kg
rool
rool
lbr
bh
Kg
Kg
Kg
Kg
Kg
m2
Kg
Kg
Bh
Bh
Bh
m2
11,500
8,800
9,000
66,500
139,000
13,000
56,000
64,000
7,500
10,000
2,500
30,000
10,000
12,500
15,000
15,000
24,000
33,000
998,200
1,512,500
39,900
6,000
15,000
15,000
9,500
9,500
9,500
484,000
35,000
18,000
147,000
268,000
454,000
171,000
1
2
3
4
5
6
7
8
9
10
11
12
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
Kg
15,000
18,000
20,000
30,000
38,000
46,000
53,000
61,000
84,000
100,000
115,000
7,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
E. BAHAN PERPIPAAN
Besi Pipa untuk Hydrant BSP 1"
Besi Pipa untuk Hydrant BSP 1,25"
Besi Pipa untuk Hydrant BSP 1,5"
Besi Pipa untuk Hydrant BSP 2"
Pipa Galvanis 1/2"
Pipa Galvanis 3/4"
Pipa Galvanis 1"
Pipa Galvanis 1 1/4"
Pipa Galvanis 1 1/2"
Pipa Galvanis 2"
Pipa Galvanis 2 1/2"
Pipa Galvanis 3"
Pipa Galvanis 4"
Pipa 1-1/4" Black Steel /SII
Pipa 2" Black Steel /SII
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
93,000
104,000
127,000
131,000
75,000
98,000
140,000
166,000
181,000
252,000
307,000
380,000
554,000
277,000
503,000
No
16
17
18
SATUAN
btg
btg
btg
HARGA 2008
( Rp )
739,000
1,749,000
8,000
No
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
SATUAN
btg
btg
btg
btg
btg
btg
bh
bh
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
HARGA 2008
( Rp )
11,000
14,000
21,000
27,000
30,000
27,000
6,500
1,000
20,000
31,000
51,000
74,000
117,000
27,000
39,000
56,000
84,000
135,000
177,000
277,000
349,000
430,000
444,000
28,000
40,000
58,000
87,000
140,000
184,000
287,000
363,000
447,000
716,000
916,000
1,178,000
1,863,000
2,969,000
22,000
32,000
46,000
68,000
110,000
145,000
225,000
282,000
351,000
561,000
154,000
219,000
438,000
466,000
758,000
995,000
1,416,000
1,938,000
2,413,000
3,637,000
4,930,000
6,304,000
9,962,000
14,641,000
5,300
5,500
7,800
6,200
7,300
8,400
No
86
87
88
SATUAN
HARGA 2008
( Rp )
8,700
12,900
19,000
No
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
SATUAN
HARGA 2008
( Rp )
3,000
3,400
4,200
6,700
10,800
12,400
19,500
24,500
43,700
35,500
93,600
174,000
489,000
652,000
896,000
1,355,000
1,662,000
2,562,000
128,000
203,000
405,000
754,000
1,232,000
2,299,000
2,758,000
2,951,000
3,709,000
1,500
1,800
2,900
4,300
6,600
8,600
12,000
20,000
40,000
2,000
2,500
4,000
7,500
8,500
15,000
34,000
39,000
100,000
202,000
384,000
454,000
20,000
40,000
64,000
120,000
269,000
488,000
693,000
34,000
55,000
89,000
142,000
200,000
359,000
629,000
1,032,000
17,000
30,000
50,000
94,000
No
156
157
158
SATUAN
HARGA 2008
( Rp )
122,000
233,000
384,000
No
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
1
2
3
4
5
6
7
8
9
10
11
12
13
14
SATUAN
HARGA 2008
( Rp )
627,000
1,050,000
1,397,000
2,236,000
4,192,000
12,000
22,000
35,000
70,000
87,000
184,000
300,000
430,000
2,000
4,000
7,000
13,000
14,000
26,000
48,000
59,000
138,000
266,000
318,000
4,000
6,000
5,000
5,000
7,000
19,000
20,000
22,000
22,000
22,000
24,000
24,000
24,000
27,000
37,000
82,000
94,000
96,000
140,000
141,000
141,000
141,000
242,000
244,000
340,000
380,000
m
m
Bh
kg
Bh
Bh
Bh
Bh
Bh
m'
m'
kg
Bh
kg
146,000
200,000
21,000
15,000
35,000
33,000
3,327,000
39,000
47,000
24,000
60,000
8,000
438,000
26,000
No
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
SATUAN
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
btg
btg
btg
btg
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
m3
m3
m3
m3
m3
m3
m3
m'
m3
HARGA 2008
( Rp )
75,000
75,000
151,000
303,000
379,000
74,000
468,000
463,000
463,000
92,000
92,000
74,000
617,000
740,000
1,111,000
864,000
1,110,000
1,356,000
3,905,000
4,355,000
5,125,000
5,483,000
6,267,000
6,614,000
7,173,000
26,565,000
33,206,000
41,175,000
46,488,000
25,137,000
14,798,000
5,000
7,000
16,000
14,000
18,000
4,290,000
4,290,000
5,445,000
5,720,000
5,720,000
5,720,000
5,720,000
2,117,000
3,190,000
8,470,000
12,100,000
15,125,000
18,755,000
18,150,000
4,290,000
5,720,000
5,720,000
2,117,000
2,117,000
7,000
907,000
4,290,000
6,050,000
5,720,000
5,720,000
5,720,000
6,050,000
1,000
5,720,000
No
35
36
37
38
39
40
Kayu Stootwerk
List Frofil Kamper 1 cm
List Frofil Kamper 2 cm
List Frofil Kamper 4 cm
List Frofil Kamper 5 cm
List Frofil Kamper 10 cm
SATUAN
btg
m'
m'
m'
m'
m'
HARGA 2008
( Rp )
9,000
2,000
3,000
8,000
12,000
22,000
No
41
42
43
HARGA 2008
( Rp )
m'
m'
btg
108,000
30,000
lbr
bh
peti
lbr
72,000
7,000
42,000
62,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
m2
m2
m2
Lbr
65,000
62,000
62,000
90,000
94,000
108,000
139,000
48,000
96,000
145,000
72,000
121,000
102,000
84,000
42,000
60,000
9,000
6,000
10,000
84,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Lbr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
/5 Ltr
Kg
2.5 KG
2.5 KG
Gall
Kg
Kg
Kg
Kg
Bh
Bh
bh
bh
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Kg
Kg
Ltr
Ltr
Ltr
Ltr
6,000
32,000
30,000
14,000
33,000
30,000
36,000
18,000
30,000
42,000
242,000
175,000
60,000
12,000
12,000
30,000
12,000
6,000
6,000
8,000
10,000
3,000
18,000
24,000
24,000
12,000
12,000
12,000
10,000
72,000
9,000
6,000
7,000
15,000
1
2
3
3
SATUAN
No
35
36
SATUAN
Kg
Kg
HARGA 2008
( Rp )
72,000
12,000
No
SATUAN
HARGA 2008
( Rp )
K. BAHAN KACA
Glass Block 20 x 20 ex DN
Glass Block 20 x 20 ex LN
Kaca Polos 2 mm
Kaca Polos 3 mm
Kaca Polos 5 mm
Kaca Ryben 5 mm
Kaca Ryben 12 mm
bh
bh
m2
m2
m2
m2
m2
20,000
24,000
42,000
48,000
60,000
66,000
149,000
1
2
3
4
5
6
7
8
9
10
11
12
bh
Kg
Kg
Kg
bh
bh
bh
Kg
bh
Kg
Bh
bh
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
M. BAHAN SANITER
Bak fibreglass
Closet Duduk Keramik LN ( lengkap )
Closet Duduk Warna Standar INA ( lengkap )
Closet Jongkok Porselin Putih ( standar )
Closet Jongkok Porselin Warna
Floor Drain /Saringan KM stenless steel
Kran Bebek 1/2 "
Kitchen Zink Stailess Lengkap Sipon & Sparing
Kitchen Zink Stailess Standar lokal ( 1 Lobang )
Kitchen Zink Stailess Non Standar franke ( 1 Lobang )
Kitchen Zink Stailess Non Standar franke ( 2 Lobang )
Kran Panas-Dingin ( standar )
Kran Tembok 1/2 "
Kran Tembok 3/4 "
Penyekat Urinoir
Seal tape
Shower ( dengan tiang )
Shower ( tanpa tiang )
Stop kran 1 " setara KIT
Stop kran 1 " setara KIT
Tempat Sabun Porselin
Urinoir Warna Standar ( lengkap )
Wastafel Bulat Warna Standar ( lengkap )
Wastafel setara merk INA ( lengkap )
Wastafel setara merk TOTO LW 230 ( lengkap )
Water Thurn 500 liter (standar )
Water Thurn 1000 liter (standar )
Tangki Fiber Glass 3m3
Tangki Fiber Glass 6m3
Bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Lbr
Set
bh
bh
bh
bh
bh
bh
Unit
bh
bh
Bh
Bh
Bh
Bh
1
2
3
4
5
6
7
8
9
10
11
bh
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
m2
m2
Lbr
Lbr
18,000
12,000
12,000
8,000
10,000
4,800
7,800
12,000
1,200
12,000
300
3,500
78,000
786,000
1,028,000
90,000
108,000
18,000
72,000
133,000
145,000
169,000
338,000
181,000
42,000
27,000
193,000
3,000
193,000
54,000
12,000
48,000
114,000
435,000
363,000
242,000
484,000
423,000
605,000
6,600,000
36,300,000
4,500
47,000
100,000
20,000
34,000
36,000
21,000
91,000
27,000
15,000
53,000
1
2
3
4
5
6
7
No
12
13
14
15
16
Bubung Asbes
Bubung Morando glasur
Bubung Morando natural
Bubungan Genteng Beton Pres
Bubungan Genteng Plentong
SATUAN
bh
bh
bh
bh
bh
HARGA 2008
( Rp )
18,000
4,000
3,100
3,200
2,400
No
17
18
19
20
21
22
23
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Genteng Palentong
Genteng Beton Pres
Genteng Cisangkan
Genteng Morando Glasur 18 bh/m2
Genteng Morando Natural 18 bh/m2
Genting Bubungan
Atap Fiber Setara Canopy
O. BAHAN MEKANIKAL & ELEKTRIKAL ( ME )
Arde /box schreeng
Box Sikring In-bouw C4
Box Sikring Out-bouw C1 + Patron Broco
BP dan UJL 1200 Watt + tiang 2 Bh
BP dan UJL 1300 Watt
BP dan UJL 900 Watt
BP dan UJL 2200 Watt
Canopy Impralon
Jarum Penangkal Petir 16 s.d19
Kawat Penagkal Petir ( Tembaga ) 16
Lampu Baret 30 cm + Neon
Lampu Dinding
Lampu Down Light sedang
Lampu Gantung Uk. Besar
Lampu Gantung uk. Kecil
Lampu Gantung uk. Sedang
Lampu Hologin 500 Watt + Box
Lampu Mercury 60 Watt
Lampu Pijar 25 Watt
Lampu Pijar 40 Watt
Lampu SLE 15 Watt
Lampu SL 18 Watt
Lampu Sorot Philips 40 Watt
Lampu spot light 120 Watt / 150 Watt
Lampu spot light 300 Wattt
Lampu Tanam
Lampu TL 1 x 20 Watt
Lampu TL 1 x 40 Watt
Lampu TL 2 x 20 Watt
Lampu TL RM 2 x 20 Watt
Lampu TL RM 4 x 20 Watt
MLL 160 Watt
Panel LP-A
Panel LP-B
Panel LP-C
Panel LP-D
Panel LP-E
Panel SDP
Pasang telepon
Saklar Ganda Broco
Saklar tunggal Broco
Stop kontak Broco
Tiang Listrik
Titik Cahaya
Trafo 80 Watt / 220
Box Street
Genset STC 20 Kw Mesin Hopper Starter Setara Produk Cina
Kabel NYY 3x6,5mm
Kabel NYY 3x10mm
SATUAN
bh
bh
bh
bh
bh
bh
m2
Ls
bh
bh
Ls
Ls
Ls
Ls
m2
Unit
Kg
Set
bh
bh
Unit
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Ls
bh
bh
bh
bh
Ttk
bh
bh
bh
m
m
HARGA 2008
( Rp )
1,100
3,600
1,800
1,500
2,100
165,000
21,000
36,000
36,000
3,194,000
1,235,000
1,375,000
2,557,000
423,000
60,000
66,000
262,000
263,000
55,000
1,916,000
423,500
605,000
239,500
239,500
4,200
7,200
30,200
48,400
48,400
36,300
519,000
119,000
36,000
42,000
48,000
279,000
479,000
127,000
254,000
381,000
242,000
242,000
242,000
133,000
1,512,000
14,500
10,500
10,500
4,840,000
79,500
393,000
105,000
15,950,000
27,500
44,000
No
SATUAN
HARGA 2008
( Rp )
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
bh
bh
bh
bh
Psg
bh
bh
Psg
bh
Psg
Psg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
Set
bh
bh
bh
1
2
3
4
5
6
7
8
9
10
11
12
13
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
7,200
3,000
12,500
30,000
25,000
18,000
6,000
18,000
30,000
18,000
4,500
108,000
78,000
18,000
24,000
60,000
36,000
54,000
24,000
42,000
48,000
72,000
302,000
193,000
3,500
48,000
9,000
6,000
36,000
272,250,000
18,392,000
5,324,000
471,000
145,000
435,000
871,000
246,000
326,000
907,000
1,331,000
32,428,000
11,781,000
1
2
3
4
5
6
7
8
9
10
R. ALAT TUKANG
Cangkul
Karbit
Linggis
Palu
Pengki
Rool Meter 30 Meter ( Bahan besi )
Rool Meter 5 Meter ( Bahan besi )
Singkup
Slang Plastik untuk Water Pas di.0.5cm
Water Pass Alumunium
bh
Kg
bh
bh
bh
bh
bh
bh
m'
bh
29,000
12,000
49,000
19,800
9,900
66,000
10,500
42,900
1,300
34,000
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
1
2
3
4
5
6
7
8
9
10
SATUAN
HARGA 2008
( Rp )
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
110,700
706,000
106,000
41,000
249,000
315,000
199,000
23,000
41,000
17,000
61,000
88,000
73,000
173,000
30,000
86,000
202,000
92,000
23,000
47,000
123,000
188,000
84,000
152,000
358,000
69,000
86,000
47,000
23,000
357,000
17,000
42,000
73,000
88,000
60,000
47,000
60,000
34,000
17,000
17,000
47,000
14,000
188,000
73,000
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
bh
38,000
41,000
30,000
36,000
27,000
39,000
30,000
39,000
36,000
1,700
No
SATUAN
HARGA 2008
( Rp )
1
2
3
4
U. BAHAN-BAHAN LAINNYA
Alumunium 0.10 mm
Alumunium 0.30 mm
Kusen Pintu WC PVC
Kusen Pintu WC Aluminium
Lbr
Lbr
Set
Set
33,000
72,000
242,000
93,000
1
2
3
4
5
6
V. HARGA BBM
Premium
Minyak Solar
Residu /Ter
Plux Oil
Minyak Bakar
Olie SAE (Mesran, Pertamina)
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
4,500
4,300
Tasikmalaya,
2,500
19,800
Nopember 2007
Mengetahui,
Kepala Dinas Pekerjaan Umum
Kota Tasikmalaya
H. I r a w a n
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Pekerja
Pekerja (setengah terampil )
Pekerja ( terampil )
Tukang Gali
Tukang Batu ( setengah terampil )
Tukang Batu ( terampil )
Kepala Tukang Batu
Tukang Kayu ( setengah terampil )
Tukang Kayu ( terampil )
Kepala Tukang Kayu
Tukang Cat / Plitur ( setengah terampil )
Tukang Cat / Plitur ( terampil )
Kepala Tukang Cat / Plitur
Tukang Besi Beton ( setengah terampil )
Tukang Besi Beton ( terampil )
Kepala Tukang Besi Beton
Tukang Besi Frofil ( setengah terampil )
Tukang Besi Frofil ( terampil )
Kepala Tukang Besi Frofil
Mandor
Operator Alat Besar
Pembantu Operator / Mekanik
Supir Truk
Kenek Truk / Pembantu Supir Truk
Penjaga Malam
SATUAN
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HARGA
(Rp)
30,000
31,500
32,500
35,500
32,500
38,500
42,000
35,500
42,000
42,000
30,000
35,500
42,000
41,000
41,000
41,000
35,500
41,000
42,000
41,000
42,000
38,500
35,500
30,000
30,000
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
1
2
3
4
5
6
7
8
SATUAN
HARGA
(Rp)
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
Zak
Zak
Kg
m3
m3
Pengecoran/ Hari
< 20 m3/M3
<100 m3
Penambahan lebih dari
100 M3
Kg
110,000
43,000
87,000
65,000
109,000
65,000
142,000
81,000
109,000
129,000
153,000
142,000
131,000
103,000
92,000
93,000
900
3,000
2,400
2,400
1,600
500
2,700
2,700
3,300
4,800
62,000
69,000
69,000
62,000
55,000
38,000
69,000
41,000
66,000
48,000
69,000
52,000
28,000
13,000
22,000
65,000
100,000
9,000
765,000
695,000
218,000
146,000
2,195,000
Kg
ton
ton
ton
ton
ton
liter
m3
12,000
1,147,000
1,162,000
1,222,000
1,155,000
20,000
-
2,850
100,000
1
2
3
4
5
5
6
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Kg
Kg
Kg
m2
m2
m2
Kg
m2
m2
Bh
Kg
m'
m2
m2
Kg
Kg
Kg
Kg
Kg
rool
rool
lbr
bh
Kg
Kg
Bh
Bh
Bh
m2
18,000
18,000
20,000
326,000
239,000
22,000
88,000
101,000
11,000
22,000
55,000
27,000
13,000
28,000
31,000
27,000
57,000
49,000
1,499,000
2,272,000
71,000
8,900
34,400
12,600
402,000
471,000
681,000
300,000
1
2
3
4
5
6
7
8
9
10
11
12
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
ikat
19,000
23,000
28,000
34,000
41,000
54,000
69,000
108,000
84,000
96,000
145,000
8,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
E. BAHAN PERPIPAAN
Besi Pipa untuk Hydrant BSP 1"
Besi Pipa untuk Hydrant BSP 1,25"
Besi Pipa untuk Hydrant BSP 1,5"
Besi Pipa untuk Hydrant BSP 2"
Pipa Galvanis 1/2" (Ligth)
Pipa Galvanis 3/4" (Ligth)
Pipa Galvanis 1" (Ligth)
Pipa Galvanis 1 1/4" (Ligth)
Pipa Galvanis 1 1/2" (Ligth)
Pipa Galvanis 2" (Ligth)
Pipa Galvanis 2 1/2" (Ligth)
Pipa Galvanis 3" (Ligth)
Pipa Galvanis 4" (Ligth)
Pipa 1-1/4" Black Steel /SII MED A
Pipa 2" Black Steel /SII MED A
Pipa 3" Black Steel /SII MED A
Pipa 6" Black Steel /SII MED A
Talang 4 M'
Gantungan Plat
Gantungan Plastik
Pipa PVC Diameter 1/2 " (Tipe AW Setara Maspion)
Pipa PVC Diameter 3/4 " (Tipe AW Setara Maspion)
Pipa PVC Diameter 1 " (Tipe AW Setara Maspion)
Pipa PVC Diameter 1 1/2 " (Tipe AW Setara Maspion)
Pipa PVC Diameter 2 " (Tipe AW Setara Maspion)
Pipa PVC Diameter 1/2 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 3/4 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 1 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 1 1/4 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 1 1/2 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 2 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 2 1/2 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 3 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 4 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 5 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 6 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 8 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 20 mm/ 1/2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 25 mm/ 3/4 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 32 mm/ 1 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 40 mm/ 1 1/4 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
btg
bh
bh
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
22,000
24,000
30,000
31,000
15,000
19,000
25,000
32,000
37,000
52,000
80,000
93,000
121,000
72,000
113,000
194,000
435,000
6,000
1,000
600
2,400
3,400
4,000
6,000
8,000
5,000
7,000
10,000
15,000
17,000
22,000
32,000
44,000
73,000
121,000
170,000
291,000
3,900
5,800
9,900
14,500
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
Pipa PVC Diameter 50 mm/ 1 1/2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 200 mm/ 8 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 225 mm/ 8 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 250 mm/ 10 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 315 mm/ 12 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 200 mm/ 8 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 225 mm/ 8 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 250 mm/ 10 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 315 mm/ 12 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 355 mm/ 14 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 400 mm/ 16 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 500 mm/ 20 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 630 mm/ 24 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa HDPE PE Diameter 20 mm/ 1/2 "(Setara Vinilon PE100 S5 - SDR 11 PN 16)
Pipa HDPE PE Diameter 25 mm/ 3/4 "(Setara Vinilon PE 100 S5 - SDR 11 PN 16)
Pipa HDPE PE Diameter 32 mm/ 1 "(Setara Vinilon PE 100 S5 - SDR 11 PN 16)
Pipa HDPE PE Diameter 50 mm/ 1 1/2 "(Setara Vinilon PE 100 S5 - SDR 11 PN 16)
Pipa HDPE PE Diameter 63 mm/ 2 "(Setara Vinilon PE 100 S5 - SDR 11 PN 16)
Pipa HDPE PE Diameter 75 mm/ 2 1/2 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 90 mm/ 3 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 110 mm/ 4 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 125 mm/ 5 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 160 mm/ 6 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 180 mm/ 7 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 200 mm/ 8 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 225 mm/ 9 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 250 mm/ 10 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 315 mm/ 12 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 355 mm/ 14 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 400 mm/ 16 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 450 mm/ 18 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 500 mm/ 20 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 630 mm/ 24 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 50 mm/ 1 1/2"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 63 mm/ 2"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 75 mm/ 2 1/2"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 90 mm/ 3"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 110 mm/ 4"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 125 mm/ 5"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 160 mm/ 6"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 180 mm/ 7"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 200 mm/ 8"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 225 mm/ 9"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 250 mm/ 10"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 315 mm/ 12"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 355 mm/ 14"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 400 mm/ 15"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 450 mm/ 18"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 500 mm/ 20"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 630 mm/ 24"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 710 mm/ 28"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 50 mm/ 1 1/2"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 63 mm/ 2"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 75 mm/ 2 1/2"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 90 mm/ 3"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 110 mm/ 4"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 125 mm/ 5"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 160 mm/ 6"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 180 mm/ 7"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 200 mm/ 8"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 225 mm/ 9"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 250 mm/ 10"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 315 mm/ 12"(Setara Vinilon PE100 S8-SDR 17 PN 10)
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
22,000
35,000
50,000
72,000
109,000
174,000
230,000
36,000
52,000
75,000
112,000
181,000
236,000
29,000
41,000
59,000
87,000
143,000
188,000
291,000
365,000
455,000
726,000
30,000
42,000
62,000
91,000
150,000
194,000
301,000
380,000
472,000
763,000
969,000
1,241,000
1,998,000
3,180,000
5,800
7,700
20,000
31,000
49,000
68,000
99,000
148,000
192,000
314,000
397,000
490,000
620,000
762,000
1,211,000
1,537,000
1,951,000
2,671,000
3,297,000
5,233,000
25,000
40,000
56,000
81,000
122,000
158,000
259,000
329,000
403,000
512,000
631,000
1,002,000
1,271,000
1,613,000
2,208,000
2,725,000
4,321,000
6,964,000
20,000
33,000
47,000
68,000
101,000
129,000
212,000
268,000
331,000
421,000
516,000
821,000
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
Pipa HDPE PE Diameter 355 mm/ 14"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 400 mm/ 16"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 450 mm/ 18"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 500 mm/ 20"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 630 mm/ 24"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 710 mm/ 28"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 800 mm/ 32]"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 900 mm/ 35"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 1000 mm/ 40"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 50 mm/ 1 1/2"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 63 mm/ 2"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 75 mm/ 2 1/2"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 90 mm/ 3"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 110 mm/ 4"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 125 mm/ 5"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 160 mm/ 6"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 180 mm/ 7"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 200 mm/ 8"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 225 mm/ 9"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 250 mm/ 10"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 315 mm/ 12"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 355 mm/ 14"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 400 mm/ 15"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 450 mm/ 18"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 500 mm/ 20"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 630 mm/ 24"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 710 mm/ 28"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 800 mm/ 32"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 900 mm/ 35"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 1000 mm/ 40"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 1200 mm/ 48"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Straight Coupling Compresion OD 40 mm
Straight Coupling Compresion OD 50 mm
Straight Coupling Compresion OD 63 mm
Straight Coupling Compresion OD 75 mm
Straight Coupling Compresion OD 90 mm
Straight Coupling Compresion OD 110 mm
Clamp Saddle OD 63 x 1"
Clamp Saddle OD 63 x 1 1/4"
Clamp Saddle OD 75 x 1"
Clamp Saddle OD 90 x 1"
Clamp Saddle OD 90 x 1 1/4"
Clamp Saddle OD 90 x 2"
Clamp Saddle OD 110 x 1"
Clamp Saddle OD 110 x 1 1/4"
Clamp Saddle OD 110 x 2"
Clamp Saddle OD 160 x 1"
Clamp Saddle OD 160 x 1 1/4"
Ferrrule Threaded with knife dia 1 1/4" x 3/4"
Ferrrule Compression Join with knife dia 1 1/4" x 25mm
Male Thread adaptor OD 40 x 1 1/4"
Male Thread adaptor OD 50 x 1 1/2"
Male Thread adaptor OD 63 x 2"
Male Thread adaptor OD 75 x 2 1/2"
Male Thread adaptor OD 90 x 3"
Male Thread adaptor OD 110 x 4"
Male Elbow 90 OD 40 x 1 1/4"
Male Elbow 90 OD 50 x 1 1/2"
Male Elbow 90 OD 63 x 2"
Male Elbow 90 OD 75 x 2 1/2"
Male Elbow 90 OD 90 x 3"
Male Elbow 90 OD 110 x 4"
Elbow 90 OD 25 mm
Elbow 90 OD 40 mm
Elbow 90 OD 50 mm
Elbow 90 OD 63 mm
Elbow 90 OD 75 mm
Elbow 90 OD 90 mm
Elbow 90 OD 110 mm
Female Theaded Adaptor OD 110 x 4 "
Female Theaded Elbow OD 110 x 4 "
End Cap OD 40 mm
End Cap OD 50 mm
End Cap OD 63 mm
End Cap OD 75 mm
End Cap OD 90 mm
End Cap OD 110 mm
Equal Tee OD 40 mm
Equal Tee OD 50 mm
Equal Tee OD 63 mm
Equal Tee OD 75 mm
Equal Tee OD 90 mm
Equal Tee OD 110 mm
Reducing Coupler OD 63 x 32 mm
Reducing Coupler OD 63 x 40 mm
Reducing Coupler OD 63 x 50 mm
Reducing Coupler OD 75 x 50 mm
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
1,045,000
1,320,000
1,809,000
2,229,000
3,539,000
4,437,000
5,708,000
7,189,000
8,924,000
17,000
27,000
38,000
55,000
83,000
106,000
174,000
219,000
272,000
343,000
420,000
667,000
847,000
1,080,000
1,477,000
1,822,000
2,881,000
3,617,000
4,650,000
5,835,000
7,270,000
10,461,000
55,000
62,000
94,000
120,000
269,000
751,000
28,000
38,000
46,000
52,000
74,000
79,000
96,000
96,000
96,000
132,000
157,000
138,000
138,000
21,000
30,000
42,000
66,000
135,000
369,000
31,000
35,000
58,000
86,000
201,000
492,000
11,000
49,000
58,000
92,000
126,000
286,000
764,000
388,000
798,000
23,000
27,000
38,000
59,000
121,000
368,000
78,000
81,000
124,000
176,000
374,000
791,000
52,000
66,000
66,000
80,000
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
Reducing Coupler OD 75 x 63 mm
Reducing Coupler OD 90 x 63 mm
Reducing Coupler OD 110 x 63 mm
Reducing Coupler OD 110 x 75 mm
Reducing Coupler OD 110 x 90 mm
Reducing Tee OD 110 x 63 mm
Reducing Tee OD 110 x 75 mm
Reducing Tee OD 110 x 90 mm
Ts. Faucet Socket (Inj) 1/2" x 1/2"
Ts. Faucet Socket (Inj) 3/4" x 3/4"
Ts. Faucet Socket (Inj) 1" x 1"
Ts. Faucet Socket (Inj) 1 1/4" x 1 1/4"
Ts. Faucet Socket (Inj) 1 1/2" x 1 1/2"
Ts. Faucet Socket (Inj) 2" x 2"
Ts. Faucet Socket (Inj) 3" x 3"
Ts. Faucet Socket (Inj) 4" x 4"
Ts. Faucet Tee (Inj) 1/2" x 1/2"
Ts. Faucet Tee (Inj) 3/4" x 3/4"
Ts. Faucet Knee (Inj) 1/2" x 1/2"
Ts. Faucet Knee (Inj) 3/4" x 3/4"
Ts. Valve Socket (Inj) 1/2"
Ts. Valve Socket (Inj) 3/4"
Ts. Valve Socket (Inj) 1"
Ts. Valve Socket (Inj) 1 1/4"
Ts. Valve Socket (Inj) 1 1/2"
Ts. Valve Socket (Inj) 2"
Ts. Valve Socket (Inj) 3"
Ts. Valve Socket (Inj) 4"
Ts. Cap (Inj) 1/2"
Ts.Cap (Inj) 3/4"
Ts. Cap (Inj) 1"
Ts. Cap (Inj) 1 1/4"
Ts. Cap (Inj) 1 1/2"
Ts. Cap (Inj- Solvent Cement) 2"
Ts. Cap (Inj- Solvent Cement) 3"
Ts. Cap (Inj- Solvent Cement) 4"
Ts. Cap (Inj- Solvent Cement) 6"
Ts. Cap (Inj- Rubber Ring) 2"
Ts. Cap (Inj- Rubber Ring) 3"
Ts. Cap (Inj- Rubber Ring) 4"
Ts. Cap (Inj- Rubber Ring) 6"
Dresser Joint (C.l + PVC Body ) 2"
Dresser Joint (C.l + PVC Body ) 3"
Dresser Joint (C.l + PVC Body ) 4"
Dresser Joint (C.l + PVC Body ) 6"
Dresser Joint (C.l + PVC Body ) 8"
Dresser Joint (C.l + PVC Body ) 10"
Dresser Joint (C.l + PVC Body ) 12"
Dresser Joint (C.l + PVC Body ) 14"
Dresser Joint (C.l + PVC Body ) 16"
Ts. Socket - W (Heat Process) 1/2"
Ts. Socket - W (Heat Process) 3/4"
Ts. Socket - W (Heat Process) 1"
Ts. Socket - W (Heat Process) 1 1/4"
Ts. Socket - W (Heat Process) 1 1/2"
Ts. Socket - W (Heat Process) 2"
Ts. Socket - W (Heat Process) 2 1/2"
Ts. Socket - W (Heat Process) 3"
Ts. Socket - W (Heat Process) 4"
Vc. Socket - W (Heat Process) 3" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 4" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 5" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 6" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 8" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 10" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 12" (10 Kg/cm2)
Bell Va Socket (Heat Process) 2" (10 Kg/cm2)
Bell Va Socket (Heat Process) 3" (10 Kg/cm2)
Bell Va Socket (Heat Process) 4" (10 Kg/cm2)
Bell Va Socket (Heat Process) 5" (10 Kg/cm2)
Bell Va Socket (Heat Process) 6" (10 Kg/cm2)
Bell Va Socket (Heat Process) 8" (10 Kg/cm2)
Bell Va Socket (Heat Process) 10" (10 Kg/cm2)
Bell Va Socket (Heat Process) 12" (10 Kg/cm2)
Spigot Bell End (Heat Process) 2" x 11 (10 Kg/cm2)
Spigot Bell End (Heat Process) 2" x 22 (10 Kg/cm2)
Spigot Bell End (Heat Process) 2" x 45 (10 Kg/cm2)
Spigot Bell End (Heat Process) 2" x 90 (10 Kg/cm2)
Spigot Bell End (Heat Process) 3" x 11 (10 Kg/cm2)
Spigot Bell End (Heat Process) 3" x 22 (10 Kg/cm2)
Spigot Bell End (Heat Process) 3" x 45 (10 Kg/cm2)
Spigot Bell End (Heat Process) 3" x 90 (10 Kg/cm2)
Spigot Bell End (Heat Process) 4" x 11 (10 Kg/cm2)
Spigot Bell End (Heat Process) 4" x 22 (10 Kg/cm2)
Spigot Bell End (Heat Process) 4" x 45 (10 Kg/cm2)
Spigot Bell End (Heat Process) 4" x 90 (10 Kg/cm2)
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
89,000
207,000
658,000
663,000
479,000
909,000
909,000
909,000
11,000
14,000
23,000
26,000
35,000
50,000
151,000
224,000
1,600
2,000
1,600
2,600
5,600
6,100
6,100
9,700
17,000
28,000
91,500
177,100
1,900
2,800
3,700
5,700
8,800
19,000
31,000
38,000
80,000
34,000
62,000
121,000
184,000
156,000
248,000
495,000
923,000
1,508,000
2,815,000
3,377,000
3,613,000
4,541,000
1,000
1,000
3,000
5,000
7,000
10,000
14,000
24,000
48,000
24,000
48,000
78,000
146,000
329,000
597,000
848,000
41,000
67,000
108,000
173,000
244,000
439,000
770,000
1,263,000
29,000
34,000
35,000
44,000
61,000
69,000
79,000
95,000
95,000
107,000
133,000
180,000
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
1
2
3
4
5
6
7
8
9
10
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
266,000
312,000
371,000
431,000
463,000
531,000
629,000
909,000
814,000
913,000
1,156,000
1,639,000
2,200
4,600
8,400
15,700
16,900
31,600
58,600
72,000
168,700
325,600
389,100
1,700
2,700
2,700
5,000
6,700
7,000
7,400
9,900
8,900
9,400
12,000
16,000
17,000
18,000
44,000
44,000
49,000
44,000
47,000
123,000
213,000
220,000
196,000
269,000
269,000
582,000
815,000
815,000
887,000
1,900
3,000
3,600
5,600
5,700
4,100
6,000
7,700
9,000
10,000
18,000
49,000
49,000
55,000
65,000
120,000
71,000
100,000
101,000
194,000
186,000
311,000
303,000
m
m
Bh
kg
Bh
Bh
Bh
Bh
Bh
m'
194,000
266,000
27,000
19,000
48,000
45,000
4,629,000
54,000
65,000
33,000
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
1
2
3
4
5
m'
kg
Bh
kg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
83,000
11,000
609,000
36,000
139,000
139,000
292,000
598,000
737,000
139,000
918,000
904,000
904,000
180,000
197,000
139,000
1,263,000
1,482,000
2,079,000
1,263,000
1,943,000
2,194,000
3,630,000
7,260,000
9,438,000
11,132,000
12,487,000
13,057,000
14,328,000
46,827,000
53,512,000
69,958,000
77,583,000
36,498,000
24,684,000
btg
btg
btg
btg
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
btg
m3
m3
m3
m3
m3
m3
m3
m'
m3
btg
m'
m'
m'
m'
m'
m'
m'
btg
lbr
bh
peti
lbr
lbr
6,000
9,000
21,000
27,000
81,000
4,830,000
4,830,000
8,970,000
7,590,000
8,970,000
9,315,000
10,350,000
1,932,000
4,140,000
5,175,000
8,280,000
16,560,000
16,560,000
9,315,000
4,140,000
7,590,000
8,280,000
2,392,000
2,691,000
15,600
10,400
1,800,000
4,743,000
10,350,000
7,935,000
10,350,000
9,660,000
10,350,000
6,210,000
7,935,000
10,000
3,700
6,300
6,300
9,800
17,000
157,000
43,000
56,000
3,600
36,000
72,000
54,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
1
2
2
3
4
5
7
1
2
3
4
5
6
7
8
9
10
11
12
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
m2
m2
m2
Lbr
86,000
82,000
79,000
93,000
139,000
173,000
226,000
58,000
127,000
192,000
93,000
161,000
135,000
111,000
447,000
58,000
11,000
7,900
13,000
111,000
Lbr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
/5 Ltr
Kg
KG
KG
Gall
Kg
Gall
Gall
KG
KG
KG
KG
Kg
Kg
Bh
Bh
bh
bh
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Kg
Kg
1,700
36,000
36,000
54,000
36,000
36,000
42,000
15,000
18,000
36,000
117,000
84,000
78,000
15,000
72,000
90,000
169,000
114,000
199,000
127,000
31,000
15,000
6,000
6,000
9,000
12,100
4,200
16,000
34,000
34,000
14,000
24,000
12,000
14,000
72,000
14,000
2,900
8,400
19,300
100,000
16,600
K. BAHAN KACA
Glass Block 20 x 20 ex DN
Glass Block 20 x 20 ex LN
Kaca Polos 2 mm
Kaca Polos 3 mm
Kaca Polos 5 mm
Kaca Ryben 5 mm
Kaca Ryben 12 mm
bh
bh
m2
m2
m2
m2
m2
21,000
30,000
48,000
60,000
72,000
-
bh
Kg
Kg
Kg
bh
bh
bh
Kg
bh
Kg
Bh
bh
24,900
14,500
30,200
5,700
5,700
6,800
11,000
18,000
500
60,500
300
5,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
M. BAHAN SANITER
Bak fibreglass
Closet Duduk Keramik LN ( lengkap )
Closet Duduk Warna Standar INA ( lengkap )
Closet Jongkok Porselin Putih ( standar )
Closet Jongkok Porselin Warna
Floor Drain /Saringan KM stenless steel
Kran Bebek 1/2 "
Kitchen Zink Stailess Lengkap Sipon & Sparing
Kitchen Zink Stailess Standar lokal ( 1 Lobang )
Kitchen Zink Stailess Non Standar franke ( 1 Lobang )
Kitchen Zink Stailess Non Standar franke ( 2 Lobang )
Kran Panas-Dingin ( standar )
Kran Tembok 1/2 "
Kran Tembok 3/4 "
Penyekat Urinoir
Seal tape
Shower ( dengan tiang )
Shower ( tanpa tiang )
Stop kran 1 " setara KIT
Stop kran 1 " setara KIT
Tempat Sabun Porselin
Urinoir Warna Standar ( lengkap )
Wastafel Bulat Warna Standar ( lengkap )
Wastafel setara merk INA ( lengkap )
Wastafel setara merk TOTO LW 230 ( lengkap )
Water Thurn 500 liter (standar )
Water Thurn 1000 liter (standar )
Tangki Fiber Glass 3m3
Tangki Fiber Glass 10m3 #
Tangki 3m3 PE #
Tangki 6m3 PE #
Bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Lbr
Set
bh
bh
bh
bh
bh
bh
Unit
bh
bh
Bh
Bh
Bh
Bh
Bh
Bh
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
bh
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
m2
m2
Lbr
Lbr
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
284,000
1,141,000
1,492,000
157,000
175,000
90,000
84,000
193,000
210,000
217,000
363,000
262,000
15,000
18,000
280,000
1,700
108,000
72,000
17,000
69,000
165,000
631,000
527,000
351,000
702,000
1,573,000
3,146,000
8,470,000
48,702,000
4,591,900
7,514,100
6,100
65,300
139,100
26,200
47,300
50,000
29,100
126,500
37,500
20,700
70,800
24,900
25,600
22,300
26,800
18,100
2,200
6,400
2,600
2,200
14,500
261,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Ls
bh
bh
Ls
Ls
Ls
Ls
m2
Unit
Kg
Set
bh
bh
Unit
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
29,100
50,000
29,500
4,444,000
1,718,000
1,913,000
3,557,000
588,000
83,400
91,700
302,500
365,800
29,000
2,666,000
2,400
841,700
333,100
333,100
4,800
8,400
41,900
32,600
67,200
50,300
722,000
165,400
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Lampu TL 1 x 20 Watt
Lampu TL 1 x 40 Watt
Lampu TL 2 x 20 Watt
Lampu TL RM 2 x 20 Watt
Lampu TL RM 4 x 20 Watt
MLL 160 Watt
Panel LP-A
Panel LP-B
Panel LP-C
Panel LP-D
Panel LP-E
Panel SDP
Pasang telepon
Saklar Ganda Broco
Saklar tunggal Broco
Stop kontak Broco
Tiang Listrik
Titik Cahaya
Trafo 80 Watt / 220
Box Street
Genset STC 20 Kw Mesin Hopper Starter Setara Produk Cina
Genset STC 7,5 KW - Mesin 15,5 3 phase Hopper Starter, Setara Yanmar #
Kabel NYY 3x6,5mm
Kabel NYY 3x10mm
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Ls
bh
bh
bh
bh
Ttk
bh
bh
bh
bh
m
m
11,400
14,500
6,000
388,000
666,300
176,600
353,400
530,000
336,700
336,700
336,700
184,900
2,103,000
15,700
11,400
12,100
6,734,000
110,500
546,700
145,900
22,194,000
32,700,000
38,100
61,100
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
bh
bh
bh
bh
Psg
bh
bh
Psg
bh
Psg
Psg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
Set
bh
bh
bh
9,600
4,000
17,200
9,600
34,600
20,700
4,000
9,000
41,600
24,900
3,300
78,600
139,100
4,800
33,300
55,600
50,000
55,600
33,300
58,400
66,700
100,100
420,200
268,400
4,800
66,700
12,400
8,200
50,000
1
2
3
4
5
6
7
8
9
10
11
12
13
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
378,835,000
25,592,000
7,408,000
655,000
201,000
605,000
1,211,000
342,000
453,000
1,262,000
1,851,000
43,136,000
14,958,000
1
2
3
4
5
6
7
8
9
10
11
R. ALAT TUKANG
Cangkul
Karbit
Linggis
Palu
Pengki
Rool Meter 30 Meter ( Bahan besi )
Rool Meter 5 Meter ( Bahan besi )
Singkup
Slang Plastik untuk Water Pas di.0.5cm
Water Pass Alumunium
Ember
bh
Kg
bh
bh
bh
bh
bh
bh
m'
bh
bh
40,200
16,600
68,000
27,300
13,600
91,700
14,500
59,600
1,600
47,300
6,600
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
1
2
3
4
5
6
7
8
9
10
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
154,000
982,300
147,400
56,900
346,300
438,200
276,700
31,900
56,900
23,500
84,800
122,400
101,400
240,500
41,600
119,500
281,000
127,900
31,900
65,300
171,000
261,500
116,800
211,400
498,000
95,900
119,500
65,300
31,900
496,600
23,500
58,400
101,400
122,400
83,400
65,300
83,400
47,300
23,500
23,500
65,300
19,400
261,500
101,400
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
bh
50,000
54,000
38,000
43,000
35,000
44,000
41,000
47,000
47,000
1,500
1
2
3
4
U. BAHAN-BAHAN LAINNYA
Alumunium 0.10 mm
Alumunium 0.30 mm
Kusen Pintu WC PVC
Kusen Pintu WC Aluminium
Lbr
Lbr
Set
Set
45,700
100,100
278,300
125,100
1
2
3
4
3
4
V. HARGA BBM
Premium
Minyak Solar
Residu /Ter
Plux Oil
Minyak Bakar
Olie SAE (Mesran, Pertamina)
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
6,000
5,500
2,800
19,000
1300
Page 39
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Pekerja
Pekerja (setengah terampil )
Pekerja ( terampil )
Tukang Gali
Tukang Batu ( setengah terampil )
Tukang Batu ( terampil )
Kepala Tukang Batu
Tukang Kayu ( setengah terampil )
Tukang Kayu ( terampil )
Kepala Tukang Kayu
Tukang Cat / Plitur ( setengah terampil )
Tukang Cat / Plitur ( terampil )
Kepala Tukang Cat / Plitur
Tukang Besi Beton ( setengah terampil )
Tukang Besi Beton ( terampil )
Kepala Tukang Besi Beton
Tukang Besi Frofil ( setengah terampil )
Tukang Besi Frofil ( terampil )
Kepala Tukang Besi Frofil
Mandor
Operator Alat Besar
Pembantu Operator / Mekanik
Supir Truk
Kenek Truk / Pembantu Supir Truk
Penjaga Malam
SATUAN
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HOK
HARGA
(Rp)
30,000
31,500
32,500
35,500
32,500
38,500
42,000
35,500
42,000
42,000
30,000
35,500
42,000
41,000
41,000
41,000
35,500
41,000
42,000
41,000
42,000
38,500
35,500
30,000
30,000
Page 40
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
1
2
3
4
5
6
7
8
SATUAN
HARGA *)
(Rp)
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
Zak
Zak
Kg
m3
m3
Pengecoran/ Hari
< 20 m3/M3
<100 m3
Penambahan lebih dari 100 M3
100,000
30,000
70,000
50,000
95,000
65,000
125,000
67,000
90,000
122,500
135,000
125,000
115,000
98,000
85,000
56,500
850
2,500
2,000
2,000
1,500
400
3,000
4,500
3,500
4,000
29,000
31,000
38,000
41,000
44,000
28,000
56,000
25,000
48,000
35,000
61,000
38,000
25,000
26,000
4,000
17,000
23,000
18,000
51,500
71,000
7,000
616,000
577,000
165,000
110,000
-
Kg
ton
8,065
690,000
767,000
684,000
3,500
88,000
ton
ton
ton
liter
m3
Page 41
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Besi Profil
Pagar BRC lengkap tiang ( tanpa pondasi t=90 cm)
Pagar BRC lengkap tiang ( tanpa pondasi t=180 cm)
Bondek
IWF Ex DN SII
WireMesh 6 mm
WireMesh 7 mm
DOP 2.5"
Kawat Beton
Kawat Duri
Kawat Harmonika 4cm
Kawat Ram 1x1 cm
Kawat Boronjong 3 mm
Kawat Boronjong 4 mm
Kawat Las Listrik
Kawat Tembaga
Timah ( L=1 m x Tebal=1 mm ) /12 Kg
Seng Plat BJLS 30 L= 60 cm (p=100 m)
Seng Plat BJLS 30 L= 90 cm (P=100 m)
Seng Plat BJLS 28 "
Sikat Kawat
Plat Besi Tipis 0.50 mm
Plat Besi Tipis 1 mm
Plat Besi Tipis 2 mm s/d 5 mm
Plat Besi Tipis 6 mm s/d 10 mm
Plat Besi Tipis 10 mm keatas
Pintu besi baja ( termasuk rel dan kunci )
Lem Kuning ( aibond )
Lem Fox
Bronjong Kawat D3mm (1,00x0,5x2,00)
Bronjong Kawat D4mm (1,00x0,5x2,00)
Bronjong Kawat D5mm (1,00x0,5x2,00)
Rangka Atap Baja Ringan
1
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
11
12
13
E. BAHAN PERPIPAAN
Besi Pipa untuk Hydrant BSP 1"
Besi Pipa untuk Hydrant BSP 1,25"
Besi Pipa untuk Hydrant BSP 1,5"
Besi Pipa untuk Hydrant BSP 2"
Pipa Galvanis 1/2"
Pipa Galvanis 3/4"
Pipa Galvanis 1"
Pipa Galvanis 1 1/4"
Pipa Galvanis 1 1/2"
Pipa Galvanis 2"
Pipa Galvanis 2 1/2"
Pipa Galvanis 3"
Pipa Galvanis 4"
SATUAN
Kg
Kg
Kg
m2
m2
m2
Kg
m2
m2
Bh
Kg
m'
m2
m2
Kg
Kg
Kg
Kg
Kg
rool
rool
lbr
bh
Kg
Kg
Kg
Kg
Kg
m2
Kg
Kg
Bh
Bh
Bh
m2
HARGA *)
(Rp)
12,000
8,000
13,800
181,400
139,000
13,000
56,000
64,000
7,500
11,000
2,500
30,000
10,000
12,500
15,000
15,000
24,000
33,000
998,200
1,512,500
39,900
6,000
15,000
15,000
9,500
9,500
9,500
484,000
35,000
18,000
147,000
268,000
454,000
171,000
m'
m'
m'
m'
m'
m'
m'
bh (0.5m1)
bh (0.5m1)
bh (0.5m1)
bh (0.5m1)
bh (0.5m1)
13,750
19,250
24,750
28,700
34,500
45,000
57,500
38,500
49,500
60,500
115,000
7,000
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
22,000
24,000
30,000
31,000
78,060
98,220
22,836
29,216
33,902
261,000
398,220
700,000
915,000
Page 42
No
SATUAN
HARGA *)
(Rp)
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
bh
bh
277,000
503,000
739,000
1,749,000
8,500
12,500
15,000
23,000
30,000
45,000
54,000
84,700
93,650
27,000
6,500
1,000
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
Pipa PVC Diameter 20 mm/ 1/2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 25 mm/ 3/4 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 32 mm/ 1 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 40 mm/ 1 1/4 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 50 mm/ 1 1/2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 200 mm/ 8 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 225 mm/ 8 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 250 mm/ 10 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 315 mm/ 12 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 200 mm/ 8 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 225 mm/ 8 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 250 mm/ 10 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 315 mm/ 12 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 355 mm/ 14 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 400 mm/ 16 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 500 mm/ 20 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 630 mm/ 24 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 200 mm/ 8 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 225 mm/ 8 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 250 mm/ 10 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 315 mm/ 12 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 200 mm/ 8 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 225 mm/ 8 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 250 mm/ 10 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 315 mm/ 12 " ( Setara Pralon P.6 m S.12,5 Bell End )
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
20,000
31,000
51,000
74,000
117,000
27,000
39,000
56,000
84,000
135,000
177,000
277,000
349,000
430,000
444,000
28,000
40,000
58,000
87,000
140,000
184,000
287,000
363,000
447,000
716,000
916,000
1,178,000
1,863,000
2,969,000
22,000
32,000
46,000
68,000
110,000
145,000
225,000
282,000
351,000
561,000
154,000
219,000
438,000
466,000
758,000
995,000
1,416,000
1,938,000
2,413,000
3,637,000
Page 43
No
79
80
81
82
Pipa PVC Diameter 355 mm/ 14 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 400 mm/ 16 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 500 mm/ 20 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 630 mm/ 24 " ( Setara Pralon P.6 m S.12,5 Bell End )
SATUAN
btg
btg
btg
btg
HARGA *)
(Rp)
4,930,000
6,304,000
9,962,000
14,641,000
Page 44
No
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
SATUAN
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
HARGA *)
(Rp)
5,300
5,500
7,800
6,200
7,300
8,400
8,700
12,900
19,000
3,000
3,400
4,200
6,700
10,800
12,400
19,500
24,500
43,700
35,500
93,600
174,000
489,000
652,000
896,000
1,355,000
1,662,000
2,562,000
128,000
203,000
405,000
754,000
1,232,000
2,299,000
2,758,000
2,951,000
3,709,000
1,500
1,800
2,900
4,300
6,600
8,600
12,000
20,000
40,000
2,000
2,500
4,000
7,500
8,500
15,000
34,000
39,000
100,000
202,000
384,000
454,000
20,000
40,000
64,000
120,000
269,000
488,000
693,000
34,000
55,000
Page 45
No
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
SATUAN
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
HARGA *)
(Rp)
89,000
142,000
200,000
359,000
629,000
1,032,000
17,000
30,000
50,000
94,000
122,000
233,000
384,000
627,000
1,050,000
1,397,000
2,236,000
4,192,000
12,000
22,000
35,000
70,000
87,000
184,000
300,000
430,000
2,000
4,000
7,000
13,000
14,000
26,000
48,000
59,000
138,000
266,000
318,000
4,000
6,000
5,000
5,000
7,000
19,000
20,000
22,000
22,000
22,000
24,000
24,000
24,000
27,000
37,000
82,000
94,000
96,000
140,000
141,000
141,000
141,000
242,000
244,000
340,000
380,000
Page 46
No
SATUAN
HARGA *)
(Rp)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
m
m
Bh
kg
Bh
Bh
Bh
Bh
Bh
m'
m'
kg
Bh
kg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
146,000
200,000
21,000
15,000
35,000
33,000
3,327,000
39,000
47,000
24,000
60,000
8,000
438,000
26,000
100,000
100,000
210,000
430,000
530,000
100,000
660,000
650,000
650,000
130,000
130,000
100,000
120,000
152,000
2,295,000
178,500
2,290,000
2,800,000
8,000,000
9,000,000
10,500,000
11,200,000
12,950,000
13,650,000
14,800,000
26,565,000
33,206,000
41,175,000
46,488,000
25,137,000
17,000,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
btg
btg
btg
btg
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
5,000
7,000
16,000
14,000
18,000
4,290,000
4,290,000
5,445,000
5,720,000
5,720,000
5,720,000
5,720,000
1,800,000
3,190,000
8,470,000
Page 47
No
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
1
2
3
4
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
SATUAN
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
btg
m3
m3
m3
m3
m3
m3
m3
m'
m3
btg
m'
m'
m'
m'
m'
m'
m'
btg
HARGA *)
(Rp)
12,100,000
15,125,000
18,755,000
18,150,000
4,290,000
5,720,000
5,720,000
2,117,000
2,117,000
7,000
1,400,000
4,290,000
6,050,000
5,720,000
5,720,000
5,720,000
6,050,000
1,000
5,720,000
9,000
2,000
3,000
8,000
12,000
22,000
108,000
30,000
-
lbr
bh
peti
lbr
lbr
72,000
8,000
80,000
62,000
72,000
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
m2
m2
m2
Lbr
65,000
62,000
62,000
90,000
94,000
108,000
139,000
48,000
96,000
145,000
72,000
121,000
102,000
84,000
42,000
60,000
9,000
6,000
10,000
84,000
Page 48
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
9
10
11
SATUAN
Lbr
Kg
Kg
Kg
Kg
Kg
HARGA *)
(Rp)
Kg
Kg
Bh
Bh
bh
bh
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Kg
Kg
6,000
32,000
30,000
14,000
35,000
30,000
36,000
18,000
30,000
42,000
242,000
175,000
60,000
12,000
12,000
30,000
12,000
6,000
6,000
4,000
9,000
3,000
18,000
24,000
24,000
12,000
22,500
12,000
10,000
72,000
9,000
6,000
7,000
15,000
72,000
12,000
K. BAHAN KACA
Glass Block 20 x 20 ex DN
Glass Block 20 x 20 ex LN
Kaca Polos 2 mm
Kaca Polos 3 mm
Kaca Polos 5 mm
Kaca Ryben 5 mm
Kaca Ryben 12 mm
bh
bh
m2
m2
m2
m2
m2
16,500
24,000
42,000
37,500
47,500
55,000
149,000
bh
Kg
Kg
Kg
bh
bh
bh
Kg
bh
Kg
Bh
18,000
12,000
12,000
8,000
10,000
4,800
7,800
9,000
1,200
12,000
300
Kg
Kg
/5 Ltr
Kg
Gall
Gall
Gall
Kg
Kg
Page 49
No
12
Piser 12 s/d 20 cm
SATUAN
bh
HARGA *)
(Rp)
3,500
Page 50
No
SATUAN
HARGA *)
(Rp)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
M. BAHAN SANITER
Bak fibreglass
Closet Duduk Keramik LN ( lengkap )
Closet Duduk Warna Standar INA ( lengkap )
Closet Jongkok Porselin Putih ( standar )
Closet Jongkok Porselin Warna
Floor Drain /Saringan KM stenless steel
Kran Bebek 1/2 "
Kitchen Zink Stailess Lengkap Sipon & Sparing
Kitchen Zink Stailess Standar lokal ( 1 Lobang )
Kitchen Zink Stailess Non Standar franke ( 1 Lobang )
Kitchen Zink Stailess Non Standar franke ( 2 Lobang )
Kran Panas-Dingin ( standar )
Kran Tembok 1/2 "
Kran Tembok 3/4 "
Penyekat Urinoir
Seal tape
Shower ( dengan tiang )
Shower ( tanpa tiang )
Stop kran 1 " setara KIT
Stop kran 1 " setara KIT
Tempat Sabun Porselin
Urinoir Warna Standar ( lengkap )
Wastafel Bulat Warna Standar ( lengkap )
Wastafel setara merk INA ( lengkap )
Wastafel setara merk TOTO LW 230 ( lengkap )
Water Thurn 500 liter (standar )
Water Thurn 1000 liter (standar )
Tangki Fiber Glass 3m3
Tangki Fiber Glass 6m3
Tangki 3m3 PE #
Tangki 6m3 PE #
Bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Lbr
Set
bh
bh
bh
bh
bh
bh
Unit
bh
bh
Bh
Bh
Bh
Bh
Bh
Bh
105,000
786,000
1,028,000
75,000
75,000
18,000
72,000
133,000
145,000
169,000
338,000
181,000
42,000
27,000
193,000
3,000
193,000
54,000
12,000
48,000
114,000
435,000
363,000
242,000
484,000
475,000
700,000
6,600,000
36,300,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
bh
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
m2
m2
Lbr
Lbr
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
4,500
47,000
100,000
20,000
34,000
36,000
21,000
91,000
27,000
15,000
53,000
18,000
4,000
3,100
3,200
2,400
1,100
3,600
1,850
1,600
2,100
165,000
Page 51
No
SATUAN
HARGA *)
(Rp)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Ls
bh
bh
Ls
Ls
Ls
Ls
m2
Unit
Kg
Set
bh
bh
Unit
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Ls
bh
bh
bh
bh
Ttk
bh
bh
bh
bh
m
m
21,000
36,000
36,000
3,194,000
1,235,000
1,375,000
2,557,000
423,000
60,000
66,000
262,000
263,000
55,000
1,916,000
423,500
605,000
239,500
239,500
4,200
7,200
30,200
48,400
48,400
36,300
519,000
119,000
36,000
42,000
48,000
279,000
479,000
127,000
254,000
381,000
242,000
242,000
242,000
133,000
1,512,000
14,500
10,500
10,500
4,840,000
79,500
393,000
105,000
15,950,000
27,500
44,000
1
2
3
4
5
6
7
8
9
10
11
12
13
bh
bh
bh
bh
Psg
bh
bh
Psg
bh
Psg
Psg
bh
bh
7,200
3,000
12,500
30,000
25,000
18,000
6,000
18,000
30,000
18,000
4,500
108,000
78,000
Page 52
No
14
SATUAN
bh
HARGA *)
(Rp)
18,000
Page 53
No
SATUAN
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
Set
bh
bh
bh
HARGA *)
(Rp)
24,000
60,000
36,000
54,000
24,000
42,000
48,000
72,000
302,000
193,000
3,500
48,000
9,000
6,000
36,000
1
2
3
4
5
6
7
8
9
10
11
12
13
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
272,250,000
18,392,000
5,324,000
471,000
145,000
435,000
871,000
246,000
326,000
907,000
1,331,000
32,428,000
11,781,000
1
2
3
4
5
6
7
8
9
10
11
R. ALAT TUKANG
Cangkul
Karbit
Linggis
Palu
Pengki
Rool Meter 30 Meter ( Bahan besi )
Rool Meter 5 Meter ( Bahan besi )
Singkup
Slang Plastik untuk Water Pas di.0.5cm
Water Pass Alumunium
Ember
bh
Kg
bh
bh
bh
bh
bh
bh
m'
bh
bh
29,000
12,000
49,000
19,800
9,900
66,000
10,500
42,900
1,300
34,000
-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
110,700
706,000
106,000
47,100
249,000
315,000
199,000
23,000
41,000
17,000
70,100
88,000
73,000
173,000
30,000
86,000
202,000
92,000
Page 54
No
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
1
2
3
4
5
6
7
8
9
10
Genset
Draklint
Track Loader 75 100 HP
Motor Grader 100 HP
Pneumatic Drill Hammer
Ship Foot Roller
Stone Crusher
Teractor Equipnment
Screening Plent
Spreyer,Self - Proop 1001
Tamper, Viberator Plate
Crusher / SCB
Concerate Viberator
Pick Up
Dump Truck 3-4 m3
Dump Truck 5 Ton 125 HP
Flatbad Truck 3,5 Ton
Truck 3/4
Truck Fuso
Mesin Las Listrik 18 PK
Mesin Pompa Air 3"
Jack Hammer
Compressor 4000 - 6500/m( E.05 )
Pump Water 70 100 mm
Trailler, Towed 1 Ton
Water Tank 3000 - 4500 Liter
T. BAHAN LANTAI DAN PELAPIS DINDING
Keramik 40 x 40 KW I DN ( polos )
Keramik 40 x 40 KW I DN Warna
Keramik 30 x 30 KW I DN Putih ( polos )
Keramik 30 x 30 KW I DN Warna
Keramik 20 x 20 KW I DN Putih ( polos )
Keramik 20 x 20 KW I DN Warna
Keramik 20 x 25 KW I DN ( Polos )
Keramik 20 x 25 KW I DN Warna
Keramik 10 x 20 KW I DN Warna ( anti selip )
Tegel Warna 30 x 30 cm
SATUAN
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
HARGA *)
(Rp)
23,000
47,000
123,000
216,200
84,000
152,000
358,000
69,000
86,000
47,000
23,000
357,000
17,000
42,000
83,900
88,000
60,000
47,000
60,000
34,000
17,000
17,000
47,000
14,000
188,000
83,900
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
bh
38,000
41,000
30,000
36,000
27,000
39,000
30,000
39,000
36,000
1,700
1
2
3
4
U. BAHAN-BAHAN LAINNYA
Alumunium 0.10 mm
Alumunium 0.30 mm
Kusen Pintu WC PVC
Kusen Pintu WC Aluminium
Lbr
Lbr
Set
Set
33,000
72,000
242,000
93,000
1
2
3
4
5
6
V. HARGA BBM
Premium
Minyak Solar
Residu /Ter
Plux Oil
Minyak Bakar
Olie SAE (Mesran, Pertamina)
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
4,500
4,300
1,100
2,500
19,800
Page 55
Page 56
100,000
30,000
70,000
50,000
95,000
65,000
125,000
67,000
90,000
122,500
135,000
125,000
115,000
98,000
85,000
56,500
850
2,500
2,000
2,000
1,500
400
3,000
4,500
3,500
4,000
29,000
31,000
38,000
41,000
44,000
28,000
56,000
25,000
48,000
35,000
61,000
38,000
25,000
26,000
4,000
17,000
23,000
18,000
51,500
71,000
7,000
616,000
577,000
165,000
110,000
0
0
8,064.52
690,000
0
767,000
684,000
0
3,500
88,000
Page 57
12,000
8,000
13,800
181,400
0
139,000
13,000
56,000
64,000
7,500
11,000
2,500
30,000
10,000
12,500
15,000
15,000
24,000
33,000
998,200
1,512,500
39,900
6,000
15,000
15,000
9,500
9,500
9,500
484,000
35,000
18,000
147,000
268,000
454,000
171,000
13,750
19,250
24,750
28,700
34,500
45,000
57,500
38,500
49,500
60,500
115,000
7,000
78,060
98,220
22,836
29,216
33,902
261,000
398,220
Page 58
8,500
12,500
15,000
23,000
30,000
45,000
Page 59
Page 60
Page 61
Page 62
5,000
7,000
16,000
14,000
18,000
4,290,000
4,290,000
5,445,000
5,720,000
5,720,000
5,720,000
5,720,000
1,800,000
3,190,000
8,470,000
Page 63
12,100,000
15,125,000
18,755,000
18,150,000
4,290,000
5,720,000
5,720,000
2,117,000
2,117,000
7,000
0
1,400,000
4,290,000
6,050,000
5,720,000
5,720,000
5,720,000
6,050,000
1,000
5,720,000
9,000
2,000
3,000
8,000
12,000
22,000
108,000
30,000
0
72,000
8,000
80,000
62,000
72,000
65,000
62,000
62,000
90,000
94,000
108,000
139,000
48,000
96,000
145,000
72,000
121,000
102,000
84,000
42,000
60,000
9,000
6,000
10,000
84,000
Page 64
6,000
32,000
30,000
14,000
35,000
30,000
0
36,000
18,000
30,000
42,000
242,000
175,000
60,000
12,000
12,000
0
0
0
0
0
30,000
12,000
6,000
6,000
4,000
9,000
3,000
18,000
24,000
24,000
12,000
22,500
12,000
10,000
72,000
9,000
6,000
7,000
15,000
72,000
12,000
16,500
24,000
42,000
37,500
47,500
55,000
149,000
18,000
12,000
12,000
8,000
10,000
4,800
7,800
9,000
1,200
12,000
300
Page 65
3,500
Page 66
105,000
786,000
1,028,000
75,000
75,000
18,000
72,000
133,000
145,000
169,000
338,000
181,000
42,000
27,000
193,000
3,000
193,000
54,000
12,000
48,000
114,000
435,000
363,000
242,000
484,000
475,000
700,000
0
0
6,600,000
36,300,000
4,500
47,000
100,000
20,000
34,000
36,000
21,000
91,000
27,000
15,000
53,000
18,000
4,000
3,100
3,200
2,400
1,100
3,600
0
1,850
1,600
2,100
165,000
Page 67
21,000
36,000
36,000
3,194,000
1,235,000
1,375,000
2,557,000
423,000
60,000
66,000
262,000
263,000
55,000
1,916,000
423,500
605,000
239,500
239,500
4,200
7,200
30,200
48,400
48,400
36,300
519,000
119,000
36,000
42,000
48,000
279,000
479,000
127,000
254,000
381,000
242,000
242,000
242,000
133,000
1,512,000
14,500
10,500
10,500
4,840,000
79,500
393,000
105,000
15,950,000
27,500
44,000
7,200
3,000
12,500
30,000
25,000
18,000
6,000
18,000
30,000
18,000
4,500
108,000
78,000
Page 68
18,000
Page 69
24,000
60,000
36,000
54,000
24,000
42,000
48,000
72,000
302,000
193,000
3,500
48,000
9,000
6,000
36,000
272,250,000
18,392,000
5,324,000
471,000
145,000
435,000
871,000
246,000
326,000
907,000
1,331,000
32,428,000
11,781,000
29,000
12,000
49,000
19,800
9,900
66,000
10,500
42,900
1,300
34,000
110,700
706,000
106,000
47,100
249,000
315,000
199,000
23,000
41,000
17,000
70,100
88,000
73,000
173,000
30,000
86,000
202,000
92,000
Page 70
23,000
47,000
123,000
216,200
84,000
152,000
358,000
69,000
86,000
47,000
23,000
357,000
17,000
42,000
83,900
88,000
60,000
47,000
60,000
34,000
17,000
17,000
47,000
14,000
188,000
83,900
38,000
41,000
30,000
36,000
27,000
39,000
30,000
39,000
36,000
1,700
33,000
72,000
242,000
93,000
4,500
4,300
1,100
0
2,500
19,800
KODE
STRUKTU
R
No
Penampang
M2
1.20
0.80
0.30
0.960
0.80
0.80
0.25
0.200
15.00
15.00
15.00
15.00
0.70
1.00
0.25
0.175
SLOOF S1
4.00
12.00
8.00
0.20
0.30
0.060
Tul. Pokok
Sengkang
SLOOF S2
4.00
10.00
8.00
0.15
0.20
0.030
Tul. Pokok
Sengkang
KOLOM PRAKTIS
4.00
12.00
8.00
0.15
0.15
0.023
Tul. Pokok
Sengkang
KOLOM K3
4.00
13.00
2.00
10.00
8.00
0.20
0.30
0.060
Tul. Pokok
Tul. Pokok
Sengkang
KOLOM KC
4.00
12.00
10.00
8.00
0.20
0.20
0.040
Tul. Pokok
Tul. Pokok
Sengkang
KOLOM KB
6.00
16.00
2.00
12.00
8.00
0.25
0.35
0.088
Tul. Pokok
Tul. Pokok
Sengkang
Tul atas
Tul atas
Tul Bawah
Tul Bawah
PONDASI PLAT P1
16 15.00
12 15.00
16 15.00
12 15.00
Tul atas
Tul atas
Tul Bawah
Tul Bawah
PONDASI PLAT P1
16.0 15.00
12.0 15.00
12.0 15.00
12.0 15.00
P1
P2
Luas
Dimensi
Jenis
Tul atas
Tul atas
Tul Bawah
Tul Bawah
S1
KP
12.0
12.0
12.0
12.0
RING BALK
4.00
10.00
6.00
0.10
0.15
0.015
Tul. Pokok
Sengkang
RING BALK
4.00
10.00
8.00
0.15
0.20
0.030
Tul. Pokok
Sengkang
0.20
0.30
0.060
0.25
0.35
0.088
0.40
0.65
0.260
BALOK B1 (25/45)
6.00
16.00
2.00
10.00
8.00 15.00
0.25
0.45
0.113
BALOK (25/35)
5.00
16.00
2.00
10.00
8.00 15.00
0.25
0.35
0.088
1.00
0.10
0.100
Tul. Pokok
Tul. Pokok
Sengkang
Tul. Pokok
Sengkang
Tul. Pokok
Tul. Pokok
PLAT DAK
8 8 -
15.00
15.00
PLAT LANTAI 1
10 15.00
10 15.00
1.00
0.15
0.150
Tul. Pokok
Tul. Pokok
PLAT LANTAI 1
16 15.00
16 15.00
1.00
0.25
0.250
Tul. Pokok
Tul. Pokok
Selimut
Jarak
Jmh
Pjng
Berat Bsi
Jmh/
Berat
Pjng
Beton
Sengkang
Sengkang
./ M3 ( Bh )
Sekng/Bh
.+ Hak
Tul.
Kg/M'
Pjng
M3
BESI
Kg
Beton/M3
M'
0..05
0.050
0.050
0.050
0.050
0.150
0.150
0.150
0.150
8.000
6.000
8.000
6.000
1.200
1.400
1.200
1.400
1.580
0.888
0.888
0.888
9.600
8.400
9.600
8.400
15.168
7.457
8.522
7.457
38.605
0.240
0.050
0.050
0.050
0.050
0.150
0.150
0.150
0.150
6.000
6.000
6.000
6.000
1.200
1.200
1.200
1.200
1.580
0.888
0.888
0.888
7.200
7.200
7.200
7.200
8.640
8.640
8.640
8.640
34.560
0.160
0.050
0.050
0.050
0.050
0.150
0.150
0.150
0.150
7.000
7.000
7.000
7.000
0.950
0.950
0.950
0.950
0.888
0.888
0.888
0.888
6.650
6.650
6.650
6.650
5.905
5.905
5.905
5.905
23.621
5.714
0.200
83.333
0.800
0.888
0.395
100.000
66.667
88.776
26.304
115.080
16.667
0.025
0.200
166.667
0.800
0.617
0.395
200.000
133.333
123.300
52.608
175.908
33.333
0.025
0.150
296.296
0.570
0.888
0.395
177.778
168.889
157.824
66.637
224.461
44.444
0.020
66.667
33.333
122.222
69.459
20.567
48.224
138.250
16.667
1.100
1.042
0.617
0.395
100.000
183.333
88.776
72.336
161.112
25.000
1.100
0.888
0.617
0.395
68.571
22.857
57.143
108.343
14.103
22.546
11.429
0.750
1.580
0.617
0.395
0.025
0.025
0.030
0.150
0.150
0.150
111.111
166.667
76.190
144.992
0.150
445.444
0.390
0.617
0.222
266.667
173.723
164.400
38.556
202.956
66.667
0.020
0.150
223.222
0.590
0.617
0.395
133.333
131.701
82.200
51.964
134.164
33.333
0.020
0.150
7.667
0.850
1.042
0.395
100.000
6.517
104.189
2.571
106.760
16.667
0.025
0.150
7.667
1.050
1.042
0.395
68.571
8.050
71.444
3.176
74.620
11.429
0.025
0.150
7.667
1.950
1.578
0.617
30.769
14.950
48.561
9.217
57.778
3.846
0.025
53.333
17.778
72.914
84.173
10.960
28.769
123.902
8.889
1.210
1.578
0.617
0.395
62.857
22.857
83.366
99.204
14.091
113.295
226.590
11.429
0.030
0.150
60.259
0.150
77.19
1.080
1.578
0.617
0.395
0.030
0.030
0.150
0.150
7.667
7.667
2.010
2.010
0.395
0.395
15.410
15.410
6.080
6.080
12.160
10.000
0.030
0.030
0.150
0.150
7.667
7.667
2.110
2.110
0.617
0.617
16.177
16.177
9.973
9.973
19.946
6.667
0.150
0.150
7.667
7.667
2.550
2.550
1.578
1.578
19.550
19.550
30.855
30.855
61.709
4.000
0.030
Berat
Luas
Besi/M3
Kg
Bekisting
/M3
160.854
4.167
216.000
5.000
134.976
1.429
117.382
10.000
295.31
179.426
20.000
295.31
228.950
26.667
141.015
13.333
164.334
20.000
147.892
11.429
207.015
20.000
136.847
21.667
108.895
13.333
76.112
9.143
58.933
3.077
126.380
10.222
231.122
10.857
121.603
12.000
132.972
10.173
246.837
9.533
Keuntungan 10 %
HARGA
KODE
JENIS PEKERJAAN
A
A-01
A-02
A-03
A-04
A-05
KOEFISIEN SATUAN
c
PEKERJAAN PERSIAPAN
1 m' PAGAR SEMENTARA DARI KAYU, tinggi=2 METER
Dolken Kayu D 8-10/400 Cm
1.2500
Semen Portland
2.5000
Pasir Beton
0.0050
Koral Beton
0.0090
Kayu 5/7
0.0720
Paku biasa 2"-5"
0.0600
Residu
0.4000
Tukang Kayu
0.2000
Pekerja
0.4000
Kepala Tukang
0.0200
Mandor
0.0200
Total
Total Harga
Keuntungan
Jumlah Total
Btg
kg
m3
m3
m3
Kg
Lt
HOK
HOK
HOK
HOK
( Rp )
e
14,000.00
1,030.00
125,000.00
125,000.00
1,400,000.00
9,000.00
1,100.00
42,000.00
30,000.00
42,000.00
41,000.00
0.0120
0.0200
0.0070
0.1000
0.1000
0.0100
0.0050
BAHAN
( Rp )
g=(cxe)
HARGA SATUAN
PEKERJAAN
( Rp )
h
17,500.00
2,575.00
625.00
1,125.00
100,800.00
540.00
440.00
8,400.00
12,000.00
840.00
820.00
22,060.00
123,605.00
145,665.00
14,566.50
160,231.50
1 m' PAGAR SEMENTARA /PENGAMAN PROYEK DARI SENG GELOMBANG, tinggi=2 METER
Dolken Kayu D 8-10/400 Cm
1.2500
Btg
14,000.00
Semen Portland
2.5000
Kg
1,030.00
Seng gelombang 3"-5"
1.2000
lbr
39,900.00
Pasir Beton
0.0050
m3
125,000.00
Koral Beton
0.0090
m3
125,000.00
Kayu 5/7
0.0720
m3
2,117,000.00
Paku biasa 2"-5"
0.0600
Kg
9,000.00
Meni besi
0.4500
Kg
18,000.00
Tukang kayu
0.2000
HOK
42,000.00
Pekerja
0.4000
HOK
30,000.00
Kepala tukang
0.0200
HOK
42,000.00
Mandor
0.0200
HOK
41,000.00
Total
Total Harga
Keuntungan
Jumlah Total
1 m' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER
Dolken Kayu D 8-10/400 Cm
1.0000
Semen Portland
2.0000
Kawat Duri
25.0000
Pasir Beton
0.0050
Koral Beton
0.0090
Paku biasa 2"-5"
0.0600
Tukang kayu
0.2000
Pekerja
0.3000
Kepala tukang
0.0200
Mandor
0.0200
Total
Total Harga
Keuntungan
Jumlah Total
HARGA
UPAH
( Rp )
f=(cxe)
Btg
Kg
Kg
m3
m3
Kg
HOK
HOK
HOK
HOK
14,000.00
1,030.00
2,500.00
125,000.00
125,000.00
9,000.00
42,000.00
30,000.00
42,000.00
41,000.00
17,500.00
2,575.00
47,880.00
625.00
1,125.00
152,424.00
540.00
8,100.00
8,400.00
12,000.00
840.00
820.00
22,060.00
230,769.00
252,829.00
25,282.90
278,111.90
14,000.00
2,060.00
62,500.00
625.00
1,125.00
540.00
8,400.00
9,000.00
840.00
820.00
19,060.00
80,850.00
99,910.00
9,991.00
109,901.00
m3
Kg
m3
HOK
HOK
HOK
HOK
1,400,000.00
9,000.00
1,400,000.00
42,000.00
30,000.00
42,000.00
41,000.00
16,800.00
180.00
9,800.00
4,200.00
3,000.00
420.00
205.00
7,825.00
26,780.00
34,605.00
3,460.50
38,065.50
252,000.00
7,650.00
13,200.00
36,050.00
9,750.00
12,500.00
13,500.00
12,000.00
9,975.00
b
Kunci tanam
Plywood 4 mm
Tukang kayu
Tukang Batu
Pekerja
Kepala Tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
A-06
A-07
A-08
A-09
A-10
A-11
d
0.1500
0.0600
2.0000
1.0000
2.0000
0.3000
0.0500
Bh
Lbr
HOK
HOK
HOK
HOK
HOK
42,000.00
38,500.00
30,000.00
42,000.00
41,000.00
f=(cxe)
84,000.00
38,500.00
60,000.00
12,600.00
2,050.00
197,150.00
g=(cxe)
366,625.00
563,775.00
56,377.50
620,152.50
Btg
m3
Kg
Kg
m3
m3
Lbr
HOK
HOK
HOK
HOK
1.2500
0.1860
0.3000
18.0000
0.0300
0.0500
1.5000
1.3500
2.0000
1.0000
0.2000
0.0500
14,000.00
1,400,000.00
9,000.00
1,030.00
125,000.00
125,000.00
39,900.00
42,000.00
30,000.00
42,000.00
41,000.00
23,800.00
294,000.00
2,700.00
10,815.00
3,750.00
6,250.00
59,850.00
84,000.00
30,000.00
8,400.00
2,050.00
124,450.00
401,165.00
525,615.00
52,561.50
578,176.50
Btg
m3
Kg
Lbr
HOK
HOK
HOK
HOK
14,000.00
1,400,000.00
9,000.00
39,900.00
42,000.00
30,000.00
42,000.00
41,000.00
42,000.00
386,400.00
6,300.00
59,850.00
63,000.00
30,000.00
6,300.00
2,050.00
101,350.00
494,550.00
595,900.00
59,590.00
655,490.00
Btg
m3
Kg
Kg
m3
m3
Lbr
Lbr
HOK
HOK
HOK
HOK
30,000.00
41,000.00
3,000.00
2,050.00
5,050.00
5,050.00
505.00
5,555.00
14,000.00
1,400,000.00
9,000.00
1,030.00
125,000.00
125,000.00
39,900.00
48,000.00
42,000.00
30,000.00
42,000.00
41,000.00
17,500.00
260,400.00
2,700.00
18,540.00
3,750.00
6,250.00
59,850.00
64,800.00
84,000.00
30,000.00
8,400.00
2,050.00
124,450.00
433,790.00
558,240.00
55,824.00
614,064.00
m3
Kg
Btg
HOK
HOK
1,400,000.00
9,000.00
7,000.00
42,000.00
41,000.00
50,400.00
720.00
7,000.00
12,600.00
61.50
12,661.50
58,120.00
70,781.50
7,078.15
77,859.65
0.00
7,000.00
42,000.00
42,000.00
30,000.00
41,000.00
0.00
1,750.00
714.00
84.00
7,500.00
533.00
Total
Total Harga
Keuntungan
Jumlah Total
A-12
A-13
A-14
A-15
A-16
8,831.00
g=(cxe)
1,750.00
10,581.00
1,058.10
11,639.10
0.1500
0.0900
0.0100
1.0000
0.0500
m3
m3
m3
HOK
HOK
67,000.00
98,000.00
95,000.00
30,000.00
41,000.00
10,050.00
8,820.00
950.00
30,000.00
2,050.00
32,050.00
19,820.00
51,870.00
5,187.00
57,057.00
6.6670
0.3330
HOK
HOK
30,000.00
41,000.00
200,010.00
13,653.00
213,663.00
213,663.00
21,366.30
235,029.30
0.6667
0.0333
HOK
HOK
30,000.00
41,000.00
20,001.00
1,365.30
21,366.30
21,366.30
2,136.63
23,502.93
0.4000
0.1000
PEKERJAAN TANAH
1 m3 GALIAN TANAH BIASA SEDALAM 1 METER
Pekerja
Mandor
Total
Total Harga
Keuntungan
HOK
HOK
30,000.00
41,000.00
1,500.00
1,025.00
2,525.00
2,525.00
252.50
2,777.50
HOK
HOK
30,000.00
41,000.00
12,000.00
4,100.00
16,100.00
16,100.00
1,610.00
17,710.00
B
B-01
f=(cxe)
0.1250
0.0050
HOK
HOK
HOK
HOK
30,000.00
42,000.00
42,000.00
41,000.00
3,000.00
1,050.00
105.00
205.00
4,360.00
4,360.00
436.00
4,796.00
HOK
HOK
HOK
30,000.00
42,000.00
41,000.00
120,000.00
126,000.00
8,200.00
254,200.00
254,200.00
25,420.00
279,620.00
HOK
HOK
30,000.00
41,000.00
3,750.00
205.00
3,955.00
3,955.00
395.50
4,350.50
0.4000
0.0400
HOK
HOK
30,000.00
41,000.00
12,000.00
1,640.00
13,640.00
13,640.00
1,364.00
f=(cxe)
g=(cxe)
Jumlah Total
B-02
B-03
B-04
B-05
B-06
B-07
B-08
B-09
B-10
B-11
B-12
B-13
h
15,004.00
0.5260
0.0520
HOK
HOK
30,000.00
41,000.00
15,780.00
2,132.00
17,912.00
17,912.00
1,791.20
19,703.20
0.7350
0.0730
HOK
HOK
30,000.00
41,000.00
22,050.00
2,993.00
25,043.00
25,043.00
2,504.30
27,547.30
0.6250
0.0620
HOK
HOK
30,000.00
41,000.00
18,750.00
2,542.00
21,292.00
21,292.00
2,129.20
23,421.20
1.2500
0.1250
HOK
HOK
30,000.00
41,000.00
37,500.00
5,125.00
42,625.00
42,625.00
4,262.50
46,887.50
0.8230
0.0830
HOK
HOK
30,000.00
41,000.00
24,690.00
3,403.00
28,093.00
28,093.00
2,809.30
30,902.30
0.0500
0.0050
HOK
HOK
30,000.00
41,000.00
1,500.00
205.00
1,705.00
1,705.00
170.50
1,875.50
0.5160
0.0500
HOK
HOK
30,000.00
41,000.00
15,480.00
2,050.00
17,530.00
17,530.00
1,753.00
19,283.00
0.1920
0.0190
HOK
HOK
30,000.00
41,000.00
5,760.00
779.00
6,539.00
6,539.00
653.90
7,192.90
0.5000
0.0500
HOK
HOK
30,000.00
41,000.00
15,000.00
2,050.00
17,050.00
17,050.00
1,705.00
18,755.00
1.2000
0.3000
0.0100
m3
HOK
HOK
50,000.00
30,000.00
41,000.00
60,000.00
9,000.00
410.00
9,410.00
60,000.00
69,410.00
6,941.00
76,351.00
a
B-14
B-15
b
1 m3 PEMASANGAN LAPISAN IJUK
Ijuk
Pekerja
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m3 URUGAN SIRTU
Sirtu
Pekerja
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
d
1.2000
0.1500
0.0150
m3
HOK
HOK
e
7,000.00
30,000.00
41,000.00
f=(cxe)
g=(cxe)
8,400.00
4,500.00
615.00
5,115.00
8,400.00
13,515.00
1,351.50
14,866.50
1.2000
0.2500
0.0250
m3
HOK
HOK
70,000.00
30,000.00
41,000.00
84,000.00
7,500.00
1,025.00
8,525.00
84,000.00
92,525.00
9,252.50
101,777.50
B-16
C
C-01
C-02
C-04
C-05
PEKERJAAN PONDASI
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 1 Ps
Batu belah 15/20 cm
Semen Portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 2 Ps
Batu belah 15/20 cm
Semen Portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 3 Ps
Batu belah 15/20 cm
Semen Portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 4 Ps
Batu belah 15/20 cm
Semen Portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
0.2750
0.0300
0.0500
1.0000
0.1000
m3
m3
m3
HOK
HOK
67,000.00
125,000.00
50,000.00
30,000.00
41,000.00
18,425.00
3,750.00
2,500.00
30,000.00
4,100.00
34,100.00
24,675.00
58,775.00
5,877.50
64,652.50
1.2000
0.3000
0.0100
m3
HOK
HOK
30,000.00
30,000.00
41,000.00
36,000.00
9,000.00
410.00
9,410.00
36,000.00
45,410.00
4,541.00
49,951.00
1.1000
392.0000
0.3140
1.5000
0.6000
0.0600
0.0750
m3
Kg
m3
HOK
HOK
HOK
HOK
67,000.00
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
73,700.00
403,760.00
29,830.00
45,000.00
23,100.00
2,520.00
3,075.00
73,695.00
507,290.00
580,985.00
58,098.50
639,083.50
1.1000
267.0000
0.4270
1.5000
0.6000
0.0600
0.0750
m3
Kg
m3
HOK
HOK
HOK
HOK
67,000.00
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
73,700.00
275,010.00
40,565.00
45,000.00
23,100.00
2,520.00
3,075.00
73,695.00
389,275.00
462,970.00
46,297.00
509,267.00
1.1000
202.0000
0.4850
1.5000
0.6000
0.0600
0.0750
m3
Kg
m3
HOK
HOK
HOK
HOK
67,000.00
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
73,700.00
208,060.00
46,075.00
45,000.00
23,100.00
2,520.00
3,075.00
73,695.00
327,835.00
401,530.00
40,153.00
441,683.00
1.1000
163.0000
0.5200
1.5000
0.6000
0.0600
0.0750
m3
Kg
m3
HOK
HOK
HOK
HOK
67,000.00
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
73,700.00
167,890.00
49,400.00
45,000.00
23,100.00
2,520.00
3,075.00
Total
Total Harga
Keuntungan
Jumlah Total
C-06
C-07
C-08
C-09
C-10
C-11
C-12
C-13
f=(cxe)
73,695.00
g=(cxe)
290,990.00
364,685.00
36,468.50
401,153.50
1.1000
136.0000
0.5440
1.5000
0.6000
0.0600
0.0750
m3
Kg
m3
HOK
HOK
HOK
HOK
67,000.00
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
73,700.00
140,080.00
51,680.00
45,000.00
23,100.00
2,520.00
3,075.00
73,695.00
265,460.00
339,155.00
33,915.50
373,070.50
1.1000
117.0000
0.5610
1.5000
0.6000
0.0600
0.0750
m3
Kg
m3
HOK
HOK
HOK
HOK
67,000.00
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
73,700.00
120,510.00
53,295.00
45,000.00
23,100.00
2,520.00
3,075.00
73,695.00
247,505.00
321,200.00
19,272.00
340,472.00
1.1000
91.0000
0.5610
1.5000
0.6000
0.0600
0.0750
m3
Kg
m3
HOK
HOK
HOK
HOK
67,000.00
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
73,700.00
93,730.00
53,295.00
45,000.00
23,100.00
2,520.00
3,075.00
73,695.00
220,725.00
294,420.00
29,442.00
323,862.00
1.2000
0.3000
0.7800
0.3900
0.0390
0.0390
m3
m3
HOK
HOK
HOK
HOK
67,000.00
50,000.00
30,000.00
38,500.00
42,000.00
41,000.00
80,400.00
15,000.00
23,400.00
15,015.00
1,638.00
1,599.00
41,652.00
95,400.00
137,052.00
13,705.20
150,757.20
Kg
Kg
m3
m3
Kg
HOK
HOK
HOK
HOK
8,000.00
1,030.00
125,000.00
125,000.00
11,000.00
30,000.00
38,500.00
42,000.00
41,000.00
600,000.00
208,060.00
40,000.00
61,250.00
8,800.00
90,000.00
32,725.00
3,570.00
6,150.00
132,445.00
918,110.00
1,050,555.00
105,055.50
1,155,610.50
m3
Kg
m3
m3
HOK
HOK
HOK
HOK
67,000.00
1,030.00
125,000.00
125,000.00
30,000.00
38,500.00
42,000.00
41,000.00
30,150.00
288,400.00
56,250.00
83,750.00
71,400.00
11,550.00
1,260.00
3,280.00
Total
Total Harga
Keuntungan
Jumlah Total
87,490.00
D-02
D-03
PEKERJAAN DINDING
1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 1 Ps
Bata merah ( 5x11x22 ) cm
140.0000
Semen Portland
64.0300
Pasir pasang
0.0590
Pekerja
0.6500
Tukang batu
0.2000
Kepala tukang
0.0200
Mandor
0.0300
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 2 Ps
Bata merah ( 5x11x22 ) cm
140.0000
Semen Portland
43.5000
Pasir pasang
0.0800
Pekerja
0.6500
Tukang batu
0.2000
Kepala tukang
0.0200
Mandor
0.0300
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 3 Ps
Bata merah ( 5x11x22 ) cm
140.0000
Semen Portland
32.9500
Pasir pasang
0.0910
Pekerja
0.6500
Tukang batu
0.2000
Kepala tukang
0.0200
Mandor
0.0300
Total
Total Harga
Keuntungan
Jumlah Total
g=(cxe)
458,550.00
546,040.00
54,604.00
600,644.00
D
D-01
f=(cxe)
Bh
Kg
m3
HOK
HOK
HOK
HOK
50,000.00
125,000.00
125,000.00
1,030.00
8,000.00
11,000.00
1,400,000.00
9,000.00
0.00
22,500.00
30,000.00
38,500.00
42,000.00
41,000.00
950.00
11,750.00
18,750.00
62,315.00
360,000.00
9,900.00
44,800.00
1,080.00
0.00
5,400.00
30,000.00
25,795.00
2,814.00
2,050.00
60,659.00
514,945.00
575,604.00
57,560.40
633,164.40
50,000.00
125,000.00
125,000.00
1,030.00
8,000.00
11,000.00
1,400,000.00
9,000.00
0.00
22,500.00
30,000.00
38,500.00
42,000.00
41,000.00
800.00
10,000.00
15,625.00
50,470.00
276,000.00
7,700.00
37,800.00
1,080.00
0.00
4,500.00
24,000.00
19,250.00
2,100.00
1,640.00
46,990.00
403,975.00
450,965.00
45,096.50
496,061.50
400.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
56,000.00
65,950.90
3,835.00
19,500.00
7,700.00
840.00
1,230.00
29,270.00
125,785.90
155,055.90
15,505.59
170,561.49
Bh
Kg
m3
HOK
HOK
HOK
HOK
400.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
56,000.00
44,805.00
5,200.00
19,500.00
7,700.00
840.00
1,230.00
29,270.00
106,005.00
135,275.00
13,527.50
148,802.50
Bh
Kg
m3
HOK
HOK
HOK
HOK
400.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
56,000.00
33,938.50
5,915.00
19,500.00
7,700.00
840.00
1,230.00
29,270.00
95,853.50
125,123.50
12,512.35
137,635.85
a
D-04
D-05
Bh
Kg
m3
HOK
HOK
HOK
HOK
Bh
Kg
m3
HOK
HOK
HOK
HOK
D-09
D-013
D-014
D-015
D-016
D-017
g=(cxe)
56,000.00
27,346.50
6,045.00
19,500.00
7,700.00
840.00
1,230.00
29,270.00
89,391.50
400.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
56,000.00
22,866.00
6,630.00
19,500.00
7,700.00
840.00
1,230.00
29,270.00
85,496.00
114,766.00
11,476.60
126,242.60
D-06
D-07
D-08
400.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
f=(cxe)
118,661.50
11,866.15
130,527.65
Bh
Kg
m3
HOK
HOK
HOK
HOK
400.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
28,000.00
19,518.50
2,470.00
9,600.00
3,850.00
420.00
615.00
14,485.00
49,988.50
64,473.50
6,447.35
70,920.85
Bh
Kg
m3
HOK
HOK
HOK
HOK
400.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
28,000.00
14,801.10
2,600.00
9,600.00
3,850.00
420.00
615.00
14,485.00
45,401.10
59,886.10
5,988.61
65,874.71
Bh
Kg
m3
HOK
HOK
HOK
HOK
400.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
28,000.00
11,845.00
2,795.00
9,600.00
3,850.00
420.00
615.00
14,485.00
42,640.00
57,125.00
5,712.50
62,837.50
Bh
Kg
m3
HOK
HOK
HOK
HOKK
400.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
28,000.00
9,970.40
2,925.00
9,600.00
3,850.00
420.00
615.00
14,485.00
40,895.40
55,380.40
5,538.04
60,918.44
Bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
2,000.00
1,030.00
95,000.00
8,000.00
30,000.00
38,500.00
42,000.00
41,000.00
f=(cxe)
g=(cxe)
25,000.00
13,905.00
4,560.00
15,600.00
10,500.00
5,775.00
630.00
697.00
17,602.00
59,065.00
76,667.00
7,666.70
84,333.70
Bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
2,000.00
1,030.00
95,000.00
8,000.00
30,000.00
38,500.00
42,000.00
41,000.00
25,000.00
10,763.50
3,610.00
15,600.00
9,600.00
4,620.00
504.00
615.00
15,339.00
54,973.50
70,312.50
7,031.25
77,343.75
12.5000
14.0500
0.0040
0.0420
3.8700
0.0060
0.0010
0.0300
0.0050
0.3700
0.1570
0.0070
0.0164
0.0185
Bh
Kg
m3
m3
Kg
Kg
m3
Kg
m3
HOK
HOK
HOK
HOK
HOK
4,000.00
1,030.00
125,000.00
95,000.00
8,000.00
9,000.00
1,400,000.00
11,000.00
125,000.00
30,000.00
38,500.00
41,000.00
42,000.00
41,000.00
50,000.00
14,471.50
500.00
3,990.00
30,960.00
54.00
1,400.00
330.00
625.00
11,100.00
6,044.50
287.00
688.80
758.50
18,878.80
102,330.50
121,209.30
12,120.93
133,330.23
12.5000
10.4600
0.0030
0.0320
0.8700
0.0040
0.0010
0.0200
0.0040
0.3400
0.1300
0.0070
0.0137
0.0170
Bh
Kg
m3
m3
Kg
Kg
m3
Kg
m3
HOK
HOK
HOK
HOK
HOK
4,000.00
1,030.00
125,000.00
95,000.00
8,000.00
9,000.00
1,400,000.00
11,000.00
125,000.00
30,000.00
38,500.00
41,000.00
42,000.00
41,000.00
50,000.00
10,773.80
375.00
3,040.00
6,960.00
36.00
1,400.00
220.00
500.00
10,200.00
5,005.00
287.00
575.40
697.00
16,764.40
73,304.80
90,069.20
9,006.92
99,076.12
12.5000
7.2000
0.0020
0.0210
2.5400
0.0030
0.0010
0.0150
0.0030
0.3400
0.1070
0.0070
0.0114
Bh
Kg
m3
m3
Kg
Kg
m3
Kg
m3
HOK
HOK
HOK
HOK
4,000.00
1,030.00
125,000.00
95,000.00
8,000.00
9,000.00
1,400,000.00
11,000.00
125,000.00
30,000.00
38,500.00
41,000.00
42,000.00
50,000.00
7,416.00
250.00
1,995.00
20,320.00
27.00
1,400.00
165.00
375.00
10,200.00
4,119.50
287.00
478.80
b
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
d
0.0170
HOK
e
41,000.00
f=(cxe)
697.00
15,782.30
g=(cxe)
81,948.00
97,730.30
9,773.03
107,503.33
Bh
Kg
m3
HOK
HOK
HOK
HOK
3,500.00
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
126,000.00
13,184.00
3,325.00
9,000.00
3,850.00
420.00
615.00
13,885.00
142,509.00
156,394.00
15,639.40
172,033.40
E
E-01
E-02
E-03
E-04
PEKERJAAN PLESTERAN
1 m2 PLESTERAN 1 PC : 1 Ps, TEBAL 15 mm
Semen Portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PLESTERAN 1 PC : 2 Ps, TEBAL 15 mm
Semen Portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PLESTERAN 1 PC : 3 Ps, TEBAL 15 mm
Semen Portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PLESTERAN 1 PC : 4 Ps, TEBAL 15 mm
Semen Portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
12.9200
0.0130
0.2000
0.1500
0.0150
0.0100
m2
m3
Kg
m3
HOK
HOK
HOK
HOK
9,000.00
1,400,000.00
9,000.00
8,000.00
30,000.00
38,500.00
42,000.00
41,000.00
13,500.00
19,600.00
108.00
24.00
3,000.00
1,925.00
210.00
82.00
5,241.00
33,208.00
38,449.00
3,844.90
42,293.90
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
13,307.60
1,235.00
6,000.00
5,775.00
630.00
410.00
12,815.00
14,542.60
27,357.60
2,735.76
30,093.36
8.5200
0.0170
0.2000
0.1500
0.0150
0.0100
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
8,775.60
1,615.00
6,000.00
5,775.00
630.00
410.00
12,815.00
10,390.60
23,205.60
2,320.56
25,526.16
6.4800
0.0190
0.2000
0.1500
0.0150
0.0100
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
6,674.40
1,805.00
6,000.00
5,775.00
630.00
410.00
12,815.00
8,479.40
21,294.40
2,129.44
23,423.84
5.2000
0.0200
0.2000
0.1500
0.0150
0.0100
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
5,356.00
1,900.00
6,000.00
5,775.00
630.00
410.00
12,815.00
7,256.00
20,071.00
2,007.10
22,078.10
a
E-05
E-06
E-07
b
1 m2 PLESTERAN 1 PC : 5 Ps, TEBAL 15 mm
Semen Portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PLESTERAN 1 PC : 6 Ps, TEBAL 15 mm
Semen Portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PLESTERAN 1 PC : 8 Ps, TEBAL 15 mm
Semen Portland
Pasir pasang
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
E-08
E-09
E-10
E-11
E-12
E-13
E-14
E-15
E-16
4.3200
0.0220
0.2000
0.1500
0.0150
0.0100
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
f=(cxe)
g=(cxe)
4,449.60
2,090.00
6,000.00
5,775.00
630.00
410.00
12,815.00
6,539.60
19,354.60
1,935.46
21,290.06
3.6800
0.0230
0.2000
0.1500
0.0150
0.0100
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
3,790.40
2,185.00
6,000.00
5,775.00
630.00
410.00
12,815.00
5,975.40
18,790.40
1,879.04
20,669.44
2.8800
0.0240
0.2000
0.1500
0.0150
0.0100
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
2,966.40
2,280.00
6,000.00
5,775.00
630.00
410.00
12,815.00
5,246.40
18,061.40
1,806.14
19,867.54
14.2800
0.0230
0.2500
0.2000
0.0200
0.0125
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
14,708.40
2,185.00
7,500.00
7,700.00
840.00
512.50
16,552.50
16,893.40
33,445.90
3,344.59
36,790.49
10.8000
0.0260
0.2500
0.2000
0.0200
0.0125
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
11,124.00
2,470.00
7,500.00
7,700.00
840.00
512.50
16,552.50
13,594.00
30,146.50
3,014.65
33,161.15
8.6800
0.0280
0.2500
0.2000
0.0200
0.0125
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
8,940.40
2,660.00
7,500.00
7,700.00
840.00
512.50
16,552.50
11,600.40
28,152.90
2,815.29
30,968.19
7.2900
0.0280
0.2500
0.2000
0.0200
0.0125
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
7,508.70
2,660.00
7,500.00
7,700.00
840.00
512.50
Total
Total Harga
Keuntungan
Jumlah Total
E-17
E-18
E-19
E-20
E-21
E-22
E-23
E-24
E-25
f=(cxe)
16,552.50
g=(cxe)
10,168.70
26,721.20
2,672.12
29,393.32
15.5000
0.0130
0.3000
0.2000
0.0200
0.0130
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
15,965.00
1,235.00
9,000.00
7,700.00
840.00
533.00
18,073.00
17,200.00
35,273.00
3,527.30
38,800.30
11.7500
0.0350
0.3000
0.2000
0.0200
0.0130
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
12,102.50
3,325.00
9,000.00
7,700.00
840.00
533.00
18,073.00
15,427.50
33,500.50
3,350.05
36,850.55
9.4800
0.0380
0.3000
0.2000
0.0200
0.0130
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
9,764.40
3,610.00
9,000.00
7,700.00
840.00
533.00
18,073.00
13,374.40
31,447.40
3,144.74
34,592.14
7.9400
0.0390
0.3000
0.2000
0.0200
0.0130
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
8,178.20
3,705.00
9,000.00
7,700.00
840.00
533.00
18,073.00
11,883.20
29,956.20
2,995.62
32,951.82
18.6500
0.0350
0.3200
0.2500
0.0250
0.0150
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
19,209.50
3,325.00
9,600.00
9,625.00
1,050.00
615.00
20,890.00
22,534.50
43,424.50
4,342.45
47,766.95
14.1500
0.0390
0.3200
0.2500
0.0250
0.0150
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
14,574.50
3,705.00
9,600.00
9,625.00
1,050.00
615.00
20,890.00
18,279.50
39,169.50
3,916.95
43,086.45
11.3800
0.0420
0.3200
0.2500
0.0250
kg
m3
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
11,721.40
3,990.00
9,600.00
9,625.00
1,050.00
b
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
E-26
E-27
E-28
E-29
E-30
E-31
E-32
E-33
E-34
d
0.0150
HOK
41,000.00
f=(cxe)
615.00
20,890.00
g=(cxe)
15,711.40
36,601.40
3,660.14
40,261.54
8.1900
0.0450
0.3200
0.2500
0.0250
0.0150
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
8,435.70
4,275.00
9,600.00
9,625.00
1,050.00
615.00
20,890.00
12,710.70
33,600.70
3,360.07
36,960.77
9.3000
0.0180
0.2600
0.2000
0.0200
0.0130
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
9,579.00
1,710.00
7,800.00
7,700.00
840.00
533.00
16,873.00
11,289.00
28,162.00
2,816.20
30,978.20
7.0700
0.0210
0.2600
0.2000
0.0200
0.0130
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
7,282.10
1,995.00
7,800.00
7,700.00
840.00
533.00
16,873.00
9,277.10
26,150.10
2,615.01
28,765.11
0.5000
0.0020
0.0570
0.0380
0.0380
0.0200
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
515.00
190.00
1,710.00
1,463.00
1,596.00
820.00
5,589.00
705.00
6,294.00
629.40
6,923.40
4.3200
0.0160
0.2500
0.1000
kg
m3
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
148.32
1,425,000.00
1,500.00
770.00
84.00
205.00
2,559.00
1,425,148.32
1,427,707.32
142,770.73
1,570,478.05
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
453.20
1,092,500.00
13,500.00
7,700.00
840.00
1,025.00
23,065.00
1,092,953.20
1,116,018.20
111,601.82
1,227,620.02
1,030.00
95,000.00
30,000.00
38,500.00
4,449.60
1,520.00
7,500.00
3,850.00
b
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
E-35
E-36
F-02
F-03
F-04
F-05
d
0.0100
0.0150
HOK
HOK
e
42,000.00
41,000.00
f=(cxe)
420.00
615.00
12,385.00
g=(cxe)
5,969.60
18,354.60
1,835.46
20,190.06
4.3200
0.0160
0.1500
0.0700
0.0070
0.0080
kg
m3
HOK
HOK
HOK
HOK
1,030.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
4,449.60
1,520.00
4,500.00
2,695.00
294.00
328.00
7,817.00
5,969.60
13,786.60
1,378.66
15,165.26
F
F-01
0.0800
0.1430
0.1070
0.0105
0.0100
51,500.00
30,000.00
38,500.00
42,000.00
41,000.00
4,120.00
4,290.00
4,119.50
441.00
410.00
9,260.50
4,120.00
13,380.50
1,338.05
14,718.55
PEKERJAAN KAYU
1 m3 PASANG KUSEN PINTU DAN JENDELA KAYU JATI
Kayu jati, balok
1.1000
Pekerja
6.0000
Tukang kayu
20.0000
Kepala tukang
2.0000
Mandor
0.3000
Total
Total Harga
Keuntungan
Jumlah Total
1 m3 PASANG KUSEN PINTU DAN JENDELA KAYU KAMPER
Kayu kamper, balok
1.2000
Pekerja
6.0000
Tukang kayu
18.0000
Kepala tukang
2.0000
Mandor
0.3000
Total
Total Harga
Keuntungan
Jumlah Total
1 m3 PASANG KUSEN PINTU DAN JENDELA KAYU BORNEO
Kayu Borneo, balok
1.2000
Pekerja
6.0000
Tukang kayu
18.0000
Kepala tukang
2.0000
Mandor
0.3000
Total
Total Harga
Keuntungan
Jumlah Total
1 m3 PASANG KUSEN PINTU DAN JENDELA KAYU DAMAR LAUT
Kayu Borneo damar laut, balok
1.2000
Pekerja
6.0000
Tukang kayu
18.0000
Kepala tukang
2.0000
Mandor
0.3000
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PASANG PINTU KLAMP KAYU KAMPER
Kayu kamper, papan
Paku biasa 2"-5"
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Zak
HOK
HOK
HOK
HOK
0.0360
0.0500
0.3500
1.0500
0.1050
0.0180
m3
HOK
HOK
HOK
HOK
8,470,000.00
30,000.00
42,000.00
42,000.00
41,000.00
9,317,000.00
180,000.00
840,000.00
84,000.00
12,300.00
1,116,300.00
9,317,000.00
10,433,300.00
1,043,330.00
11,476,630.00
m3
HOK
HOK
HOK
HOK
5,720,000.00
30,000.00
42,000.00
42,000.00
41,000.00
6,864,000.00
180,000.00
756,000.00
84,000.00
12,300.00
1,032,300.00
6,864,000.00
7,896,300.00
789,630.00
8,685,930.00
m3
HOK
HOK
HOK
HOK
4,290,000.00
30,000.00
42,000.00
42,000.00
41,000.00
5,148,000.00
180,000.00
756,000.00
84,000.00
12,300.00
1,032,300.00
5,148,000.00
6,180,300.00
618,030.00
6,798,330.00
m3
HOK
HOK
HOK
HOK
4,290,000.00
30,000.00
42,000.00
42,000.00
41,000.00
5,148,000.00
180,000.00
756,000.00
84,000.00
12,300.00
1,032,300.00
5,148,000.00
6,180,300.00
618,030.00
6,798,330.00
m3
Kg
HOK
HOK
HOK
HOK
5,720,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
205,920.00
450.00
10,500.00
44,100.00
4,410.00
738.00
59,748.00
206,370.00
f=(cxe)
g=(cxe)
Total Harga
Keuntungan
Jumlah Total
F-06
F-07
F-08
F-09
F-10
F-11
F-12
F-13
h
266,118.00
26,611.80
292,729.80
0.0360
0.0500
0.3500
1.0500
0.1050
0.0180
m3
Kg
HOK
HOK
HOK
HOK
4,290,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
154,440.00
450.00
10,500.00
44,100.00
4,410.00
738.00
59,748.00
154,890.00
214,638.00
21,463.80
236,101.80
0.0400
1.0000
2.5000
0.2500
0.0500
m3
HOK
HOK
HOK
HOK
8,470,000.00
30,000.00
42,000.00
42,000.00
41,000.00
338,800.00
30,000.00
105,000.00
10,500.00
2,050.00
147,550.00
338,800.00
486,350.00
48,635.00
534,985.00
0.0400
1.0000
2.5000
0.2500
0.0500
m3
HOK
HOK
HOK
HOK
228,800.00
30,000.00
105,000.00
10,500.00
2,050.00
147,550.00
228,800.00
376,350.00
37,635.00
413,985.00
5,720,000.00
30,000.00
42,000.00
42,000.00
41,000.00
m3
HOK
HOK
HOK
HOK
8,470,000.00
30,000.00
42,000.00
42,000.00
41,000.00
296,450.00
24,000.00
84,000.00
8,400.00
1,640.00
118,040.00
296,450.00
414,490.00
41,449.00
455,939.00
5,720,000.00
30,000.00
42,000.00
42,000.00
41,000.00
200,200.00
24,000.00
84,000.00
8,400.00
1,640.00
118,040.00
200,200.00
318,240.00
31,824.00
350,064.00
4,290,000.00
30,000.00
42,000.00
42,000.00
41,000.00
150,150.00
24,000.00
84,000.00
8,400.00
1,640.00
118,040.00
150,150.00
268,190.00
26,819.00
295,009.00
8,470,000.00
30,000.00
42,000.00
42,000.00
41,000.00
542,080.00
30,000.00
126,000.00
12,600.00
12,300.00
180,900.00
542,080.00
722,980.00
72,298.00
795,278.00
m3
HOK
HOK
5,720,000.00
30,000.00
42,000.00
366,080.00
30,000.00
126,000.00
b
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
F-14
F-15
F-16
F-17
F-18
F-19
d
0.3000
0.5000
HOK
HOK
42,000.00
41,000.00
m3
Kg
Lt
Lbr
HOK
HOK
HOK
HOK
8,470,000.00
9,000.00
18,000.00
48,000.00
30,000.00
42,000.00
42,000.00
41,000.00
g=(cxe)
366,080.00
0.0600
0.1500
0.5000
2.0000
0.2000
0.0250
166,012.00
270.00
5,400.00
48,000.00
18,000.00
84,000.00
8,400.00
1,230.00
111,630.00
219,682.00
331,312.00
33,131.20
364,443.20
12,600.00
20,500.00
189,100.00
555,180.00
55,518.00
610,698.00
f=(cxe)
5,720,000.00
9,000.00
18,000.00
48,000.00
30,000.00
42,000.00
42,000.00
41,000.00
112,112.00
270.00
5,400.00
48,000.00
18,000.00
84,000.00
8,400.00
1,230.00
111,630.00
165,782.00
277,412.00
27,741.20
305,153.20
m3
Kg
HOK
HOK
HOK
HOK
8,470,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
508,200.00
1,350.00
15,000.00
84,000.00
8,400.00
1,025.00
108,425.00
509,550.00
617,975.00
61,797.50
679,772.50
0.0600
0.1500
0.5000
2.0000
0.2000
0.0250
m3
Kg
HOK
HOK
HOK
HOK
343,200.00
1,350.00
15,000.00
84,000.00
8,400.00
1,025.00
108,425.00
344,550.00
452,975.00
45,297.50
498,272.50
5,720,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
m3
Kg
Lt
Lbr
HOK
HOK
HOK
HOK
4,290,000.00
9,000.00
18,000.00
48,000.00
30,000.00
42,000.00
42,000.00
41,000.00
`
84,084.00
270.00
5,400.00
48,000.00
18,000.00
84,000.00
8,400.00
1,230.00
111,630.00
137,754.00
249,384.00
24,938.40
274,322.40
8,470,000.00
9,000.00
18,000.00
48,000.00
30,000.00
42,000.00
42,000.00
41,000.00
166,012.00
2,700.00
5,400.00
48,000.00
18,000.00
84,000.00
8,400.00
1,230.00
111,630.00
222,112.00
333,742.00
33,374.20
367,116.20
a
F-20
F-21
F-22
F-23
F-24
F-25
m3
Kg
Lt
Lbr
Lbr
HOK
HOK
HOK
HOK
5,720,000.00
9,000.00
18,000.00
48,000.00
30,000.00
42,000.00
42,000.00
41,000.00
f=(cxe)
g=(cxe)
112,112.00
2,700.00
5,400.00
48,000.00
18,000.00
84,000.00
8,400.00
1,230.00
111,630.00
168,212.00
279,842.00
27,984.20
307,826.20
8,470,000.00
9,000.00
18,000.00
48,000.00
65,000.00
30,000.00
42,000.00
42,000.00
41,000.00
166,012.00
2,700.00
14,400.00
48,000.00
32,500.00
24,000.00
105,000.00
10,500.00
1,640.00
141,140.00
263,612.00
404,752.00
40,475.20
445,227.20
5,720,000.00
9,000.00
18,000.00
48,000.00
65,000.00
30,000.00
42,000.00
42,000.00
41,000.00
112,112.00
2,700.00
14,400.00
48,000.00
32,500.00
24,000.00
105,000.00
10,500.00
1,640.00
141,140.00
209,712.00
350,852.00
35,085.20
385,937.20
8,470,000.00
9,000.00
18,000.00
48,000.00
65,000.00
30,000.00
42,000.00
42,000.00
41,000.00
166,012.00
2,700.00
14,400.00
24,000.00
32,500.00
24,000.00
105,000.00
10,500.00
1,640.00
141,140.00
239,612.00
380,752.00
38,075.20
418,827.20
5,720,000.00
9,000.00
18,000.00
48,000.00
65,000.00
30,000.00
42,000.00
42,000.00
41,000.00
112,112.00
2,700.00
14,400.00
24,000.00
32,500.00
24,000.00
105,000.00
10,500.00
1,640.00
141,140.00
185,712.00
326,852.00
32,685.20
359,537.20
8,470,000.00
9,000.00
18,000.00
48,000.00
65,000.00
30,000.00
42,000.00
42,000.00
41,000.00
166,012.00
2,700.00
21,600.00
48,000.00
65,000.00
30,000.00
109,200.00
10,920.00
2,050.00
152,170.00
303,312.00
f=(cxe)
g=(cxe)
Total Harga
Keuntungan
Jumlah Total
F-26
F-27
F-28
F-29
F-30
F-31
F-32
F-33
F-34
455,482.00
45,548.20
501,030.20
m3
Kg
Kg
HOK
HOK
HOK
HOK
5,720,000.00
9,000.00
18,000.00
48,000.00
65,000.00
30,000.00
42,000.00
42,000.00
41,000.00
112,112.00
2,700.00
21,600.00
48,000.00
65,000.00
30,000.00
109,200.00
10,920.00
2,050.00
152,170.00
249,412.00
401,582.00
40,158.20
441,740.20
5,720,000.00
12,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
6,292,000.00
180,000.00
7,200.00
120,000.00
504,000.00
50,400.00
8,200.00
682,600.00
6,479,200.00
7,161,800.00
716,180.00
7,877,980.00
m3
Kg
Kg
HOK
HOK
HOK
HOK
4,290,000.00
12,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
4,719,000.00
180,000.00
7,200.00
120,000.00
504,000.00
50,400.00
8,200.00
682,600.00
4,906,200.00
5,588,800.00
558,880.00
6,147,680.00
m3
Kg
Kg
HOK
HOK
HOK
HOK
5,720,000.00
12,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
6,292,000.00
180,000.00
7,200.00
120,000.00
504,000.00
50,400.00
8,200.00
682,600.00
6,479,200.00
7,161,800.00
716,180.00
7,877,980.00
m3
Kg
HOK
HOK
HOK
HOK
5,720,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
68,640.00
1,350.00
3,000.00
4,200.00
420.00
205.00
7,825.00
69,990.00
77,815.00
7,781.50
85,596.50
m3
Kg
HOK
HOK
HOK
HOK
4,290,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
51,480.00
1,350.00
3,000.00
4,200.00
420.00
205.00
7,825.00
52,830.00
60,655.00
6,065.50
66,720.50
m3
5,720,000.00
80,080.00
b
Paku biasa 2"-5"
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
F-35
F-36
F-37
F-39
F-40
F-41
F-42
F-43
d
0.1500
0.1000
0.1000
0.0100
0.0050
Kg
HOK
HOK
HOK
HOK
e
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
f=(cxe)
g=(cxe)
1,350.00
3,000.00
4,200.00
420.00
205.00
7,825.00
81,430.00
89,255.00
8,925.50
98,180.50
m3
Kg
HOK
HOK
HOK
HOK
4,290,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
60,060.00
1,350.00
3,000.00
4,200.00
420.00
205.00
7,825.00
61,410.00
69,235.00
6,923.50
76,158.50
m3
Kg
HOK
HOK
HOK
HOK
5,720,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
943,800.00
1,800.00
3,600.00
5,040.00
504.00
246.00
9,390.00
945,600.00
954,990.00
95,499.00
1,050,489.00
m3
Kg
HOK
HOK
HOK
HOK
4,290,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
707,850.00
1,800.00
3,600.00
5,040.00
504.00
246.00
9,390.00
709,650.00
719,040.00
71,904.00
790,944.00
m3
Kg
HOK
HOK
HOK
HOK
5,720,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
68,640.00
900.00
4,500.00
10,500.00
1,050.00
3,075.00
19,125.00
69,540.00
88,665.00
8,866.50
97,531.50
m3
Kg
HOK
HOK
HOK
HOK
4,290,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
51,480.00
900.00
4,500.00
10,500.00
1,050.00
3,075.00
19,125.00
52,380.00
71,505.00
7,150.50
78,655.50
5,720,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
131,560.00
1,350.00
6,000.00
12,600.00
1,260.00
410.00
20,270.00
132,910.00
153,180.00
15,318.00
168,498.00
4,290,000.00
9,000.00
98,670.00
1,350.00
b
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
F-44
F-45
F-46
F-47
F-48
F-49
F-50
F-51
F-52
F-53
F-54
d
0.2000
0.3000
0.0300
0.0100
HOK
HOK
HOK
HOK
m3
Kg
HOK
HOK
HOK
HOK
f=(cxe)
6,000.00
12,600.00
1,260.00
410.00
20,270.00
g=(cxe)
100,020.00
5,720,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
41,184.00
450.00
3,000.00
8,400.00
840.00
205.00
12,445.00
41,634.00
54,079.00
5,407.90
59,486.90
5,720,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
62,920.00
450.00
3,300.00
9,240.00
924.00
205.00
13,669.00
63,370.00
77,039.00
7,703.90
84,742.90
30,000.00
42,000.00
42,000.00
41,000.00
120,290.00
12,029.00
132,319.00
m3
m3
Kg
HOK
HOK
HOK
HOK
5,720,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
82,940.00
540.00
4,500.00
10,500.00
1,050.00
3,075.00
19,125.00
83,480.00
102,605.00
10,260.50
112,865.50
5,720,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
49,192.00
540.00
3,000.00
4,200.00
420.00
2,050.00
9,670.00
49,732.00
59,402.00
5,940.20
65,342.20
4,290,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
37,752.00
540.00
3,000.00
4,200.00
420.00
2,050.00
9,670.00
38,292.00
47,962.00
4,796.20
52,758.20
5,720,000.00
5,720,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
111,540.00
40,040.00
900.00
4,500.00
18,900.00
1,890.00
3,075.00
28,365.00
152,480.00
180,845.00
18,084.50
198,929.50
a
F-55
F-56
F-57
F-58
F-59
F-60
m3
m3
Kg
HOK
HOK
HOK
HOK
4,290,000.00
4,290,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
1.0500
0.0210
0.0210
0.0020
0.0010
g=(cxe)
83,655.00
30,030.00
900.00
4,500.00
18,900.00
1,890.00
3,075.00
28,365.00
114,585.00
142,950.00
14,295.00
157,245.00
f=(cxe)
lbr
kg
HOK
HOK
HOK
HOK
48,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
111,540.00
40,040.00
900.00
102,000.00
4,500.00
18,900.00
1,890.00
3,075.00
28,365.00
254,480.00
282,845.00
28,284.50
311,129.50
111,540.00
40,040.00
900.00
10,080.00
48,000.00
6,000.00
25,200.00
2,520.00
410.00
34,130.00
210,560.00
244,690.00
24,469.00
269,159.00
19,200.00
450.00
750.00
3,150.00
315.00
53.30
4,268.30
19,650.00
23,918.30
2,391.83
26,310.13
m'
HOK
HOK
HOK
HOK
8,000.00
30,000.00
42,000.00
42,000.00
41,000.00
8,400.00
630.00
882.00
84.00
41.00
1,637.00
8,400.00
10,037.00
1,003.70
11,040.70
1,800,000.00
12,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
1,980,000.00
180,000.00
7,200.00
120,000.00
504,000.00
50,400.00
8,200.00
682,600.00
2,167,200.00
2,849,800.00
284,980.00
3,134,780.00
21,600.00
1,350.00
3,000.00
4,200.00
420.00
b
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
d
0.0050
HOK
G-02
G-03
G-04
PEKERJAAN BETON
1 m3 MEMBUAT BETON TUMBUK, 1 PC : 3 Ps : 5 Kr
Semen portland
Pasir beton
Koral beton
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m3 MEMBUAT BETON TUMBUK, 1 PC : 3 Ps : 6 Kr
Semen portland
Pasir beton
Koral beton
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m3 MEMBUAT BETON TUMBUK, 1 PC : 4 Ps : 6 Kr
Semen portland
Pasir beton
Koral beton
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
41,000.00
f=(cxe)
205.00
7,825.00
g=(cxe)
22,950.00
30,775.00
3,077.50
33,852.50
G
G-01
218.0000
0.5200
0.8700
1.6500
0.2500
0.0250
0.0800
kg
m3
m3
HOK
HOK
HOK
HOK
1,800,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
21,600.00
900.00
4,500.00
10,500.00
1,050.00
3,075.00
19,125.00
22,500.00
41,625.00
4,162.50
45,787.50
1,800,000.00
30,000.00
42,000.00
42,000.00
41,000.00
1,980,000.00
180,000.00
840,000.00
84,000.00
12,300.00
1,116,300.00
1,980,000.00
3,096,300.00
309,630.00
3,405,930.00
1,400,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
12,320.00
540.00
3,000.00
4,200.00
420.00
2,050.00
9,670.00
12,860.00
22,530.00
2,253.00
24,783.00
1,030.00
125,000.00
125,000.00
30,000.00
38,500.00
42,000.00
41,000.00
224,540.00
65,000.00
108,750.00
49,500.00
9,625.00
1,050.00
3,280.00
63,455.00
398,290.00
461,745.00
46,174.50
507,919.50
197.0000
0.4700
0.9400
1.6500
0.2500
0.0250
0.0800
kg
m3
m3
HOK
HOK
HOK
HOK
1,030.00
125,000.00
125,000.00
30,000.00
38,500.00
42,000.00
41,000.00
202,910.00
58,750.00
117,500.00
49,500.00
9,625.00
1,050.00
3,280.00
63,455.00
379,160.00
442,615.00
44,261.50
486,876.50
173.0000
0.5700
0.8700
1.6500
0.2500
0.0250
0.0800
kg
m3
m3
HOK
HOK
HOK
HOK
1,030.00
125,000.00
125,000.00
30,000.00
38,500.00
42,000.00
41,000.00
178,190.00
71,250.00
108,750.00
49,500.00
9,625.00
1,050.00
3,280.00
63,455.00
358,190.00
421,645.00
42,164.50
463,809.50
1,030.00
125,000.00
125,000.00
30,000.00
10,300.00
3,250.00
5,500.00
34,500.00
b
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
G-05
G-25
G-26
G-27
G-28
G-29
G-30
d
0.0200
0.0020
0.0060
HOK
HOK
HOK
e
38,500.00
42,000.00
41,000.00
f=(cxe)
770.00
84.00
246.00
35,600.00
g=(cxe)
19,050.00
54,650.00
5,465.00
60,115.00
232.0000
0.5200
0.7800
1.6500
0.2500
0.0250
0.0800
kg
m3
m3
HOK
HOK
HOK
HOK
1,030.00
125,000.00
125,000.00
30,000.00
38,500.00
42,000.00
41,000.00
238,960.00
65,000.00
97,500.00
49,500.00
9,625.00
1,050.00
3,280.00
63,455.00
401,460.00
464,915.00
46,491.50
511,406.50
1.0500
0.0150
0.0070
0.0070
0.0007
0.0003
Kg
Kg
HOK
HOK
HOK
HOK
8,000.00
11,000.00
30,000.00
41,000.00
41,000.00
41,000.00
8,400.00
165.00
210.00
287.00
28.70
12.30
538.00
8,565.00
9,103.00
910.30
10,013.30
1.0500
0.0100
0.0050
0.0050
0.0005
0.0003
Kg
Kg
HOK
HOK
HOK
HOK
8,000.00
11,000.00
30,000.00
41,000.00
41,000.00
41,000.00
8,400.00
110.00
150.00
205.00
20.50
12.30
387.80
8,510.00
8,897.80
889.78
9,787.58
1.0200
0.8050
0.0250
0.0250
0.0025
0.0015
Kg
Kg
HOK
HOK
HOK
HOK
8,000.00
11,000.00
30,000.00
41,000.00
41,000.00
41,000.00
8,160.00
8,855.00
750.00
1,025.00
102.50
61.50
1,939.00
17,015.00
18,954.00
1,895.40
20,849.40
0.0400
0.3000
0.1000
0.3000
0.2600
0.0260
0.0050
m3
Kg
Ltr
HOK
HOK
HOK
HOK
1,400,000.00
9,000.00
900.00
30,000.00
42,000.00
42,000.00
41,000.00
56,000.00
2,700.00
90.00
9,000.00
10,920.00
1,092.00
205.00
21,217.00
58,790.00
80,007.00
8,000.70
88,007.70
0.0450
0.3000
0.1000
0.3000
0.2600
0.0260
0.0050
m3
Kg
Ltr
HOK
HOK
HOK
HOK
1,400,000.00
9,000.00
900.00
30,000.00
42,000.00
42,000.00
41,000.00
63,000.00
2,700.00
90.00
9,000.00
10,920.00
1,092.00
205.00
21,217.00
65,790.00
87,007.00
8,700.70
95,707.70
0.0400
0.4000
m3
Kg
9,000.00
0.00
3,600.00
b
Minyak bekisting
Balok kayu Kelas III
Plywood tebal 9 mm
Dolken kayu galam q 8 - 10/4 m
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
G-31
G-32
G-33
G-34
G-35
d
0.2000
0.0150
0.3500
2.0000
0.3000
0.3300
0.0330
0.0060
Ltr
m3
Lbr
Btg
HOK
HOK
HOK
HOK
e
900.00
1,400,000.00
96,000.00
14,000.00
30,000.00
42,000.00
42,000.00
41,000.00
f=(cxe)
g=(cxe)
180.00
21,000.00
33,600.00
28,000.00
9,000.00
13,860.00
1,386.00
246.00
24,492.00
86,380.00
110,872.00
11,087.20
121,959.20
0.0400
0.4000
0.2000
0.0180
0.3500
2.0000
0.3200
0.3300
0.0330
0.0060
m3
Kg
Ltr
m3
Lbr
Btg
HOK
HOK
HOK
HOK
0.00
9,000.00
900.00
1,400,000.00
96,000.00
14,000.00
30,000.00
42,000.00
42,000.00
41,000.00
0.00
3,600.00
180.00
25,200.00
33,600.00
28,000.00
9,600.00
13,860.00
1,386.00
246.00
25,092.00
90,580.00
115,672.00
11,567.20
127,239.20
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
0.3200
0.3300
0.0330
0.0060
m3
Kg
Ltr
m3
Lbr
Btg
HOK
HOK
HOK
HOK
0.00
9,000.00
900.00
1,400,000.00
96,000.00
14,000.00
30,000.00
42,000.00
42,000.00
41,000.00
0.00
3,600.00
180.00
21,000.00
33,600.00
84,000.00
9,600.00
13,860.00
1,386.00
246.00
25,092.00
142,380.00
167,472.00
16,747.20
184,219.20
0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000
0.3200
0.3300
0.0330
0.0060
m3
Kg
Ltr
m3
Lbr
Btg
Bh
HOK
HOK
HOK
HOK
0.00
9,000.00
900.00
1,400,000.00
96,000.00
14,000.00
0.00
30,000.00
42,000.00
42,000.00
41,000.00
0.00
3,600.00
180.00
28,000.00
33,600.00
42,000.00
0.00
9,600.00
13,860.00
1,386.00
246.00
25,092.00
107,380.00
132,472.00
13,247.20
145,719.20
0.0300
0.4000
0.1500
0.0150
0.3500
2.0000
0.3200
0.3300
0.0330
0.0060
m3
Kg
Ltr
m3
Lbr
Btg
HOK
HOK
HOK
HOK
0.00
9,000.00
900.00
1,400,000.00
96,000.00
14,000.00
30,000.00
42,000.00
42,000.00
41,000.00
0.00
3,600.00
135.00
21,000.00
33,600.00
28,000.00
9,600.00
13,860.00
1,386.00
246.00
25,092.00
86,335.00
111,427.00
11,142.70
122,569.70
388.0000
0.6500
0.6500
6.0000
1.0000
0.1000
0.3000
Kg
m3
m3
HOK
HOK
HOK
HOK
1,030.00
125,000.00
125,000.00
30,000.00
38,500.00
42,000.00
41,000.00
399,640.00
81,250.00
81,250.00
180,000.00
38,500.00
4,200.00
12,300.00
Total
Total Harga
Keuntungan
Jumlah Total
G-36
G-37
G-38
g=(cxe)
562,140.00
797,140.00
79,714.00
876,854.00
400.0000
0.4000
0.8200
6.0000
1.0000
0.1000
0.3000
Kg
m3
m3
HOK
HOK
HOK
HOK
1,030.00
125,000.00
125,000.00
30,000.00
38,500.00
42,000.00
41,000.00
412,000.00
50,000.00
102,500.00
180,000.00
38,500.00
4,200.00
12,300.00
235,000.00
564,500.00
799,500.00
79,950.00
879,450.00
0.0264
0.6000
0.5000
0.1500
0.0500
0.0050
0.0070
m3
Kg
Btg
HOK
HOK
HOK
HOK
0.00
9,000.00
14,000.00
30,000.00
38,500.00
42,000.00
41,000.00
0.00
5,400.00
7,000.00
4,500.00
1,925.00
210.00
287.00
6,922.00
12,400.00
19,322.00
1,932.20
21,254.20
0.2000
1.5000
0.4000
150.0000
2.2500
323.0000
0.5200
0.7800
3.9000
0.3500
1.0400
1.0500
0.2450
0.1650
m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
HOK
HOK
HOK
HOK
HOK
HOK
0.00
9,000.00
900.00
8,000.00
11,000.00
1,030.00
125,000.00
125,000.00
30,000.00
38,500.00
42,000.00
41,000.00
42,000.00
41,000.00
0.00
13,500.00
360.00
1,200,000.00
24,750.00
332,690.00
65,000.00
97,500.00
117,000.00
13,475.00
43,680.00
43,050.00
10,290.00
6,765.00
234,260.00
1,733,800.00
1,968,060.00
196,806.00
2,164,866.00
G-40
235,000.00
G-39
f=(cxe)
0.2700
2.0000
0.6000
200.0000
3.0000
323.0000
0.5200
0.7800
4.8500
0.3500
1.5600
1.4000
0.3310
0.1700
m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
HOK
HOK
HOK
HOK
HOK
HOK
0.00
9,000.00
900.00
8,000.00
11,000.00
1,030.00
125,000.00
125,000.00
30,000.00
38,500.00
42,000.00
41,000.00
42,000.00
41,000.00
0.00
18,000.00
540.00
1,600,000.00
33,000.00
332,690.00
65,000.00
97,500.00
145,500.00
13,475.00
65,520.00
57,400.00
13,902.00
6,970.00
302,767.00
2,146,730.00
2,449,497.00
244,949.70
2,694,446.70
0.4000
4.0000
2.0000
300.0000
4.5000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg
HOK
HOK
HOK
0.00
9,000.00
900.00
8,000.00
11,000.00
1,030.00
125,000.00
125,000.00
4,290,000.00
96,000.00
14,000.00
30,000.00
38,500.00
42,000.00
0.00
36,000.00
1,800.00
2,400,000.00
49,500.00
332,690.00
65,000.00
97,500.00
643,500.00
336,000.00
280,000.00
219,000.00
13,475.00
138,600.00
b
Tukang besi
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
G-41
e
41,000.00
42,000.00
41,000.00
f=(cxe)
86,100.00
23,940.00
10,250.00
491,365.00
g=(cxe)
4,241,990.00
4,733,355.00
473,335.50
5,206,690.50
0.3200
3.2000
1.6000
200.0000
3.0000
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
5.9600
0.3500
2.8000
1.4000
0.4550
0.2080
m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg
HOK
HOK
HOK
HOK
HOK
HOK
0.00
9,000.00
900.00
8,000.00
11,000.00
1,030.00
125,000.00
125,000.00
4,290,000.00
96,000.00
14,000.00
30,000.00
38,500.00
42,000.00
41,000.00
42,000.00
41,000.00
0.00
28,800.00
1,440.00
1,600,000.00
33,000.00
332,690.00
65,000.00
97,500.00
600,600.00
268,800.00
224,000.00
178,800.00
13,475.00
117,600.00
57,400.00
19,110.00
8,528.00
394,913.00
3,251,830.00
3,646,743.00
364,674.30
4,011,417.30
0.3200
3.2000
1.6000
150.0000
2.2500
323.0000
0.5200
0.7800
0.1200
2.8000
32.0000
5.8000
0.3500
2.8000
1.0500
0.4200
0.1850
m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg
HOK
HOK
HOK
HOK
HOK
HOK
0.00
9,000.00
900.00
8,000.00
11,000.00
1,030.00
125,000.00
125,000.00
4,290,000.00
96,000.00
14,000.00
30,000.00
38,500.00
42,000.00
41,000.00
42,000.00
41,000.00
0.00
28,800.00
1,440.00
1,200,000.00
24,750.00
332,690.00
65,000.00
97,500.00
514,800.00
268,800.00
448,000.00
174,000.00
13,475.00
117,600.00
43,050.00
17,640.00
7,585.00
373,350.00
2,981,780.00
3,355,130.00
335,513.00
3,690,643.00
G-44
HOK
HOK
HOK
G-43
d
2.1000
0.5700
0.2500
G-42
0.2400
3.2000
1.6000
150.0000
2.2500
323.0000
0.5200
0.7800
0.1600
2.8000
24.0000
5.6000
0.3500
2.6400
1.0500
0.4000
0.1930
m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg
HOK
HOK
HOK
HOK
HOK
HOK
0.00
9,000.00
900.00
8,000.00
11,000.00
1,030.00
125,000.00
125,000.00
4,290,000.00
96,000.00
14,000.00
30,000.00
38,500.00
42,000.00
41,000.00
42,000.00
41,000.00
0.00
28,800.00
1,440.00
1,200,000.00
24,750.00
332,690.00
65,000.00
97,500.00
686,400.00
268,800.00
336,000.00
168,000.00
13,475.00
110,880.00
43,050.00
16,800.00
7,913.00
360,118.00
3,041,380.00
3,401,498.00
340,149.80
3,741,647.80
0.2500
3.0000
1.2000
200.0000
3.0000
323.0000
0.5200
0.7800
m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
0.00
9,000.00
900.00
8,000.00
11,000.00
1,030.00
125,000.00
125,000.00
0.00
27,000.00
1,080.00
1,600,000.00
33,000.00
332,690.00
65,000.00
97,500.00
b
Kayu borneo balok
Plywood 9 mm
Dolken kayu 8 cm /4.00 m
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
G-45
G-46
c
0.1050
2.5000
14.0000
5.6000
0.3500
2.3000
1.4000
0.4050
0.2020
d
m3
Lbr
Btg
HOK
HOK
HOK
HOK
HOK
HOK
f=(cxe)
g=(cxe)
450,450.00
240,000.00
196,000.00
168,000.00
13,475.00
96,600.00
57,400.00
17,010.00
8,282.00
360,767.00
3,042,720.00
3,403,487.00
340,348.70
3,743,835.70
e
4,290,000.00
96,000.00
14,000.00
30,000.00
38,500.00
42,000.00
41,000.00
42,000.00
41,000.00
1.0000
3.0769
58.9335
m3
Kg
Kg
Kg
Kg
m3
m3
HOK
HOK
HOK
HOK
HOK
HOK
0.00
9,000.00
8,000.00
11,000.00
1,030.00
125,000.00
125,000.00
30,000.00
38,500.00
42,000.00
41,000.00
42,000.00
41,000.00
0.00
90.00
24,000.00
4,950.00
4,120.00
750.00
1,125.00
1,800.00
770.00
840.00
820.00
252.00
123.00
4,605.00
35,035.00
39,640.00
3,964.00
43,604.00
1,400,000.00
9,000.00
8,000.00
11,000.00
1,030.00
125,000.00
125,000.00
30,000.00
38,500.00
42,000.00
41,000.00
42,000.00
41,000.00
4,200.00
180.00
28,800.00
550.00
5,665.00
1,125.00
1,875.00
3,000.00
1,270.50
1,386.00
1,353.00
420.00
205.00
7,634.50
42,395.00
50,029.50
5,002.95
55,032.45
M3
M2
KG
507,919.50
127,239.20
10,013.30
507,919.50
391,505.23
590,118.45
1,489,543.18
1,489,543.18
1.0000
10.1733
132.9722
M3
M2
KG
507,919.50
127,239.20
10,013.30
507,919.50
1,294,446.79
1,331,490.53
3,133,856.82
3,133,856.82
1.0000
20.0000
164.3342
M3
M2
KG
507,919.50
127,239.20
10,013.30
507,919.50
2,544,784.00
1,645,528.05
4,698,231.55
4,698,231.55
1.0000
10.0000
117.3816
M3
M2
KG
507,919.50
127,239.20
10,013.30
507,919.50
1,272,392.00
1,175,377.18
2,955,688.68
2,955,688.68
1.0000
13.3333
108.8949
M3
M2
KG
507,919.50
127,239.20
10,013.30
507,919.50
1,696,522.67
1,090,397.41
3,294,839.57
a
H
H-01
H-02
H-03
H-04
H-05
H-06
H-07
H-08
b
TOTAL HARGA
PEKERJAAN PENUTUP ATAP
1 m2 PASANG ATAP GENTENG PALENTONG KECIL
Genteng palentong
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PASANG ATAP GENTENG KODOK / GLAZZUR
Genteng kodok
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
f=(cxe)
g=(cxe)
h
3,294,839.57
25.0000
0.1500
0.0750
0.0080
0.0080
Bh
HOK
HOK
HOK
HOK
750.00
30,000.00
42,000.00
42,000.00
41,000.00
18,750.00
4,500.00
3,150.00
336.00
328.00
8,314.00
18,750.00
27,064.00
2,706.40
29,770.40
25.0000
0.1500
0.0750
0.0080
0.0080
1,500.00
30,000.00
42,000.00
42,000.00
41,000.00
37,500.00
4,500.00
3,150.00
336.00
328.00
8,314.00
37,500.00
45,814.00
4,581.40
50,395.40
Bh
HOK
HOK
HOK
HOK
5.0000
8.0000
0.0320
0.4000
0.2000
0.0200
0.0020
Bh
HOK
HOK
HOK
HOK
750.00
30,000.00
42,000.00
42,000.00
41,000.00
9,000.00
4,500.00
2,520.00
252.00
328.00
7,600.00
9,000.00
16,600.00
1,660.00
18,260.00
Bh
Kg
m3
HOK
HOK
HOK
HOK
2,100.00
1,030.00
65,000.00
30,000.00
42,000.00
42,000.00
41,000.00
10,500.00
8,240.00
2,080.00
12,000.00
8,400.00
840.00
82.00
21,322.00
20,820.00
42,142.00
4,214.20
46,356.20
5.0000
8.0000
0.0320
0.4000
0.2000
0.0200
0.0020
Bh
Zak
m3
HOK
HOK
HOK
HOK
2,100.00
1,030.00
65,000.00
30,000.00
42,000.00
42,000.00
41,000.00
10,500.00
8,240.00
2,080.00
12,000.00
8,400.00
840.00
82.00
21,322.00
20,820.00
42,142.00
4,214.20
46,356.20
4.0000
8.0000
0.0320
0.4000
0.2000
0.0200
0.0020
Bh
Kg
m3
HOK
HOK
HOK
HOK
2,100.00
1,030.00
65,000.00
30,000.00
42,000.00
42,000.00
41,000.00
8,400.00
8,240.00
2,080.00
12,000.00
8,400.00
840.00
82.00
21,322.00
18,720.00
40,042.00
4,004.20
44,046.20
0.6000
0.0500
0.1400
0.0670
0.0070
0.0070
Lbr
Kg
HOK
HOK
HOK
HOK
34,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
20,400.00
450.00
4,200.00
2,814.00
294.00
287.00
7,595.00
20,850.00
28,445.00
2,844.50
31,289.50
b
Asbes gelombang
Paku pancing 60x230
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
H-09
H-10
H-11
H-12
H-13
H-14
H-15
d
0.5000
0.1200
0.1400
0.0750
0.0080
0.0080
Lbr
Kg
HOK
HOK
HOK
HOK
e
100,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
f=(cxe)
g=(cxe)
50,000.00
1,080.00
4,200.00
3,150.00
336.00
328.00
8,014.00
51,080.00
59,094.00
5,909.40
65,003.40
Lbr
Kg
HOK
HOK
HOK
HOK
100,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
60,000.00
1,080.00
4,200.00
3,150.00
336.00
328.00
8,014.00
61,080.00
69,094.00
6,909.40
76,003.40
Lbr
Kg
HOK
HOK
HOK
HOK
100,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
6,000.00
1,080.00
4,200.00
2,940.00
294.00
287.00
7,721.00
7,080.00
14,801.00
1,480.10
16,281.10
Lbr
Kg
HOK
HOK
HOK
HOK
100,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
75,000.00
1,080.00
4,200.00
2,940.00
294.00
287.00
7,721.00
76,080.00
83,801.00
8,380.10
92,181.10
Lbr
Kg
HOK
HOK
HOK
HOK
20,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
7,000.00
1,080.00
4,200.00
2,940.00
294.00
287.00
7,721.00
8,080.00
15,801.00
1,580.10
17,381.10
Lbr
Kg
HOK
HOK
HOK
HOK
20,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
8,400.00
1,080.00
4,200.00
2,940.00
294.00
287.00
7,721.00
9,480.00
17,201.00
1,720.10
18,921.10
Lbr
Kg
HOK
HOK
HOK
HOK
20,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
8,800.00
1,080.00
4,200.00
2,814.00
294.00
287.00
7,595.00
9,880.00
17,475.00
1,747.50
19,222.50
Lbr
Kg
20,000.00
9,000.00
10,200.00
1,080.00
H-16
I
I-02
I-11
I-13
I-14
I-19
I-20
Pekerja
0.1400
Tukang kayu
0.0670
Kepala tukang
0.0070
Mandor
0.0070
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PASANG ATAP ASBES GELOMBANG ( 5,50X1,50 m )X 4 mm
Asbes gelombang
0.8000
Paku pancing
0.1200
Pekerja
0.1400
Tukang kayu
0.0670
Kepala tukang
0.0070
Mandor
0.0070
Total
Total Harga
Keuntungan
Jumlah Total
PEKERJAAN LANGIT-LANGIT
1 m2 LANGIT-LANGIT ASBES (1.00X1.00 ) m, TEBAL 5 mm
Plat asbes 5mm
1.1000
Paku
0.0100
Pekerja
0.0300
Tukang kayu
0.0700
Kepala tukang
0.0070
Mandor
0.0015
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 LANGIT-LANGIT PLYWOOD (60X120) cm, TEBAL 6 mm
Plywood 4x8x4 mm
0.3750
Paku
0.0300
Pekerja
0.0700
Tukang kayu
0.1000
Kepala tukang
0.0100
Mandor
0.0035
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 LANGIT-LANGIT TEAKWOOD (60X120) cm, TEBAL 4 mm
Teakwood 4x8x4 mm
0.3750
Paku
0.0300
Pekerja
0.0700
Tukang kayu
0.1000
Kepala tukang
0.0100
Mandor
0.0035
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 LANGIT-LANGIT LAT KAYU JATI
Kayu papan jati
Paku
Paku skrup
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 m' LIST LANGIT-LANGIT KAYU PROFIL
List kayu profil
Paku
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
0.0240
0.0100
0.0500
0.2000
0.6000
0.0600
0.0100
HOK
HOK
HOK
HOK
e
30,000.00
42,000.00
42,000.00
41,000.00
f=(cxe)
4,200.00
2,814.00
294.00
287.00
7,595.00
g=(cxe)
11,280.00
18,875.00
1,887.50
20,762.50
Lbr
Kg
HOK
HOK
HOK
HOK
20,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
16,000.00
1,080.00
4,200.00
2,814.00
294.00
287.00
7,595.00
17,080.00
24,675.00
2,467.50
27,142.50
Lbr
Kg
HOK
HOK
HOK
HOK
8,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
8,800.00
90.00
900.00
2,940.00
294.00
61.50
4,195.50
8,890.00
13,085.50
1,308.55
14,394.05
Lbr
Kg
HOK
HOK
HOK
HOK
48,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
18,000.00
270.00
2,100.00
4,200.00
420.00
143.50
6,863.50
18,270.00
25,133.50
2,513.35
27,646.85
Lbr
Kg
HOK
HOK
HOK
HOK
102,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
38,250.00
270.00
2,100.00
4,200.00
420.00
143.50
6,863.50
38,520.00
45,383.50
4,538.35
49,921.85
m3
Kg
Kg
HOK
HOK
HOK
HOK
8,470,000.00
9,000.00
0.00
30,000.00
42,000.00
42,000.00
41,000.00
203,280.00
90.00
0.00
6,000.00
25,200.00
2,520.00
410.00
34,130.00
203,370.00
237,500.00
23,750.00
261,250.00
1.1000
0.0100
0.0500
0.0500
0.0050
0.0030
m'
Kg
HOK
HOK
HOK
HOK
12,000.00
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
13,200.00
90.00
1,500.00
2,100.00
210.00
123.00
3,933.00
13,290.00
17,223.00
1,722.30
18,945.30
51,480.00
540.00
0.00
b
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
I-21
I-24
d
0.1800
0.3200
0.0320
0.0090
e
30,000.00
42,000.00
42,000.00
41,000.00
0.3640
0.1100
0.1000
0.0500
0.0050
0.0050
m3
Kg
Lbr
HOK
HOK
HOK
HOK
4,290,000.00
9,000.00
48,000.00
30,000.00
42,000.00
42,000.00
41,000.00
Lbr
Kg
HOK
HOK
HOK
HOK
J-02
g=(cxe)
52,020.00
98,670.00
540.00
18,720.00
8,100.00
16,800.00
1,680.00
553.50
27,133.50
117,930.00
0.00
0.00
30,000.00
42,000.00
42,000.00
41,000.00
0.00
0.00
3,000.00
2,100.00
210.00
205.00
5,515.00
0.00
5,515.00
551.50
6,066.50
5,400.00
13,440.00
1,344.00
369.00
20,553.00
145,063.50
14,506.35
159,569.85
J
J-01
f=(cxe)
72,573.00
7,257.30
79,830.30
HOK
HOK
HOK
HOK
1.0000
Unit *)
6.00% Harga Kloset
3.3000
HOK
1.1000
HOK
0.0010
HOK
0.1600
HOK
2,117,000.00
9,000.00
48,000.00
30,000.00
42,000.00
42,000.00
41,000.00
25,404.00
540.00
0.00
5,400.00
13,440.00
1,344.00
369.00
20,553.00
25,944.00
46,497.00
4,649.70
51,146.70
48,691.00
540.00
18,720.00
8,100.00
16,800.00
1,680.00
553.50
27,133.50
67,951.00
95,084.50
9,508.45
104,592.95
1,028,000.00
1,028,000.00
30,000.00
38,500.00
42,000.00
41,000.00
1,028,000.00
61,680.00
99,000.00
42,350.00
42.00
6,560.00
147,952.00
1,089,680.00
1,237,632.00
123,763.20
1,361,395.20
1.0000
6.0000
0.0100
1.0000
1.5000
1.5000
0.1600
Bh
Kg
m3
HOK
HOK
HOK
HOK
75,000.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
75,000.00
6,180.00
650.00
30,000.00
57,750.00
63,000.00
6,560.00
157,310.00
81,830.00
239,140.00
23,914.00
263,054.00
a
J-04
J-05
J-07
J-08
J-09
J-10
J-11
d
1.0000
30.0%
6.0000
0.0100
1.0000
1.0000
0.1000
0.1000
1.0000
12.0%
6.0000
0.0100
1.2000
1.4500
0.1500
0.1000
g=(cxe)
435,000.00
130,500.00
6,180.00
650.00
30,000.00
38,500.00
4,200.00
4,100.00
76,800.00
572,330.00
Bh
wastafel
Kg
m3
HOK
HOK
HOK
HOK
242,000.00
242,000.00
7,000.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
242,000.00
29,040.00
42,000.00
650.00
36,000.00
55,825.00
6,300.00
4,100.00
102,225.00
313,690.00
415,915.00
41,591.50
457,506.50
1.0000
18.0%
1.8000
2.7000
0.5400
0.1100
Bh
Hrg Bak
HOK
HOK
HOK
HOK
105,000.00
105,000.00
30,000.00
38,500.00
42,000.00
41,000.00
105,000.00
18,900.00
54,000.00
103,950.00
22,680.00
4,510.00
185,140.00
123,900.00
309,040.00
30,904.00
339,944.00
435,000.00
435,000.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
f=(cxe)
649,130.00
64,913.00
714,043.00
Bh
Urinoir
Kg
m3
HOK
HOK
HOK
HOK
1.0000
20.0%
0.0750
0.7500
0.2500
m3
Kg
m3
Bh
Kg
HOK
HOK
HOK
HOK
400.00
1,030.00
65,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
160.00
123,600.00
19,500.00
0.00
42,000.00
180,000.00
115,500.00
12,600.00
12,300.00
320,400.00
185,260.00
505,660.00
50,566.00
556,226.00
bh
Badkip
HOK
HOK
HOK
HOK
0.00
0.00
0.00
0.00
-
0.9000
m3
180.0000
Kg
8.0000
m2
5.0000
m2
10.0% Tot bahan
3.5000
HOK
4.5000
HOK
0.9000
HOK
0.9000
HOK
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
bh
Badkip
HOK
0.00
0.00
0.00
b
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
J-14
J-15
J-16
J-17
J-18
d
4.5000
0.9000
0.9000
f=(cxe)
HOK
HOK
HOK
g=(cxe)
0.00
0.00
0.00
0.00
0.00
-
1.1000
0.0270
3.9200
0.0560
0.2400
0.1400
0.0700
0.0070
0.0070
bh
m3
Kg
m3
m3
HOK
HOK
HOK
HOK
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
1.1000
0.0550
10.3000
0.0610
0.0690
0.3800
0.1900
0.0190
0.0190
bh
m3
Kg
m3
m3
HOK
HOK
HOK
HOK
34,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
37,950.00
37,950.00
3,795.00
41,745.00
37,950.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
J-19
J-20
J-21
J-22
J-24
J-25
1.2000
35.0%
0.0540
0.0900
0.0090
0.0270
m'
Hrg-pipa
HOK
HOK
HOK
HOK
13,010.00
4,553.50
30,000.00
38,500.00
42,000.00
41,000.00
f=(cxe)
g=(cxe)
15,612.00
1,593.73
1,620.00
3,465.00
378.00
1,107.00
6,570.00
17,205.73
23,775.73
2,377.57
26,153.30
1.2000
35.0%
0.0540
0.0900
0.0090
0.0270
m'
Hrg-pipa
HOK
HOK
HOK
HOK
16,370.00
5,729.50
30,000.00
38,500.00
42,000.00
41,000.00
19,644.00
2,005.33
1,620.00
3,465.00
378.00
1,107.00
6,570.00
21,649.33
28,219.33
2,821.93
31,041.26
1.2000
35.0%
0.0540
0.0900
0.0090
0.0270
m'
Hrg-pipa
HOK
HOK
HOK
HOK
3,806.00
1,332.10
30,000.00
38,500.00
42,000.00
41,000.00
4,567.20
466.24
1,620.00
3,465.00
378.00
1,107.00
6,570.00
5,033.44
11,603.44
1,160.34
12,763.78
1.2000
35.0%
0.1080
0.1800
0.0180
0.0054
m'
Hrg-pipa
HOK
HOK
HOK
HOK
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
1.2000
35.0%
0.1080
0.1800
0.0180
0.0054
m'
Hrg-pipa
HOK
HOK
HOK
HOK
43,500.00
15,225.00
30,000.00
38,500.00
42,000.00
41,000.00
52,200.00
5,328.75
3,240.00
6,930.00
756.00
221.40
11,147.40
57,528.75
68,676.15
6,867.62
75,543.77
1.2000
35.0%
0.1080
0.1800
0.0180
0.0054
m'
Hrg-pipa
HOK
HOK
HOK
HOK
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
1.2000
35.0%
0.1350
0.2250
0.0225
0.0068
m'
Hrg-pipa
HOK
HOK
HOK
HOK
152,500.00
53,375.00
30,000.00
38,500.00
42,000.00
41,000.00
183,000.00
18,681.25
4,050.00
8,662.50
945.00
278.80
13,936.30
201,681.25
215,617.55
21,561.76
237,179.31
b
Pipa PVC
Perlengkapan
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
J-26
J-27
J-28
K
K-01
K-02
K-18
K-19
d
1.2000
35.0%
0.0360
0.0600
0.0060
0.0018
m'
Hrg-pipa
HOK
HOK
HOK
HOK
f=(cxe)
g=(cxe)
h
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
1.2000
35.0%
0.0360
0.0600
0.0060
0.0018
m'
Hrg-pipa
HOK
HOK
HOK
HOK
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
1.2000
35.0%
0.0360
0.0600
0.0060
0.0018
m'
Hrg-pipa
HOK
HOK
HOK
HOK
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
1.2000
35.0%
0.0360
0.0600
0.0060
0.0018
m'
Hrg-pipa
HOK
HOK
HOK
HOK
3,750.00
1,312.50
30,000.00
38,500.00
42,000.00
41,000.00
4,500.00
459.38
1,080.00
2,310.00
252.00
73.80
3,715.80
4,959.38
8,675.18
867.52
9,542.69
1.1000
0.0800
0.0600
0.0060
0.0060
0.0003
Kg
Kg
HOK
HOK
HOK
HOK
139,000.00
18,000.00
30,000.00
41,000.00
42,000.00
41,000.00
152,900.00
1,440.00
1,800.00
246.00
252.00
12.30
2,310.30
154,340.00
156,650.30
15,665.03
172,315.33
1.0000
0.6500
0.6500
0.0650
0.0320
m2
HOK
HOK
HOK
HOK
484,000.00
30,000.00
41,000.00
42,000.00
41,000.00
484,000.00
19,500.00
26,650.00
2,730.00
1,312.00
50,192.00
484,000.00
534,192.00
53,419.20
587,611.20
0.5000
0.0150
0.0096
0.2500
0.1500
0.4000
0.0250
0.00125
Lbr
Kg
m3
Kg
HOK
HOK
HOK
HOK
39,900.00
9,000.00
4,290,000.00
18,000.00
30,000.00
42,000.00
42,000.00
41,000.00
19,950.00
135.00
41,184.00
4,500.00
4,500.00
16,800.00
1,050.00
51.25
22,401.25
65,769.00
88,170.25
8,817.03
96,987.28
b
Seng plat 3' x 6' BJLS 28
Paku biasa 1/2" - 1"
Kayu borneo, papan
Flincote /meni besi
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
0.5000
0.0150
0.0190
0.3000
0.0400
0.4000
0.0250
0.00125
Lbr
Kg
m3
Kg
HOK
HOK
HOK
HOK
e
39,900.00
9,000.00
1,800,000.00
18,000.00
30,000.00
42,000.00
42,000.00
41,000.00
f=(cxe)
g=(cxe)
19,950.00
135.00
34,200.00
5,400.00
1,200.00
16,800.00
1,050.00
51.25
19,101.25
59,685.00
78,786.25
7,878.63
86,664.88
K-20
L
L-01
L-02
L-03
L-04
L-05
Total
Total Harga
Keuntungan
Jumlah Total
PEKERJAAN KUNCI DAN KACA
1 BUAH PASANG KUNCI TANAM ANTIK
Kunci tanam antik
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 BUAH PASANG KUNCI TANAM BIASA
Kunci tanam biasa
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 BUAH PASANG KUNCI TANAM KAMAR MANDI
Kunci tanam kamar mandi
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 BUAH PASANG KUNCI SILINDER
Kunci silinder
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
1 BUAH PASANG ENGSEL PINTU
Engsel pintu
Pekerja
Lbr
Kg
m3
Kg
HOK
HOK
HOK
HOK
39,900.00
9,000.00
1,800,000.00
12,000.00
30,000.00
42,000.00
42,000.00
41,000.00
11,970.00
900.00
34,200.00
6,000.00
4,500.00
10,500.00
1,050.00
51.25
16,101.25
53,070.00
69,171.25
6,917.13
76,088.38
Kg
Kg
HOK
HOK
HOK
HOK
13,800.00
30,000.00
41,000.00
42,000.00
41,000.00
20,975.00
14,490.00
1,800.00
164.00
42.00
8.20
2,621.88
2,836.08
16,290.00
19,126.08
1,912.61
21,038.68
1.0000
0.0600
0.6000
0.0600
0.0030
bh
HOK
HOK
HOK
HOK
24,000.00
30,000.00
42,000.00
42,000.00
41,000.00
24,000.00
1,800.00
25,200.00
2,520.00
123.00
29,643.00
24,000.00
53,643.00
5,364.30
59,007.30
1.0000
0.0100
0.5000
0.0100
0.0050
bh
HOK
HOK
HOK
HOK
78,000.00
30,000.00
42,000.00
42,000.00
41,000.00
78,000.00
300.00
21,000.00
420.00
205.00
21,925.00
78,000.00
99,925.00
9,992.50
109,917.50
1.0000
0.0050
0.5000
0.0050
0.0025
bh
HOK
HOK
HOK
HOK
78,000.00
30,000.00
42,000.00
42,000.00
41,000.00
78,000.00
150.00
21,000.00
210.00
102.50
21,462.50
78,000.00
99,462.50
9,946.25
109,408.75
1.0000
0.0050
0.5000
0.0050
0.00025
bh
HOK
HOK
HOK
HOK
24,000.00
30,000.00
42,000.00
42,000.00
41,000.00
24,000.00
150.00
21,000.00
210.00
10.25
21,370.25
24,000.00
45,370.25
4,537.03
49,907.28
1.0000
0.0150
bh
HOK
12,500.00
30,000.00
12,500.00
450.00
b
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
L-06
L-07
L-09
L-11
L-12
L-14
L-15
L-16
0.1500
0.0150
0.00075
HOK
HOK
HOK
e
42,000.00
42,000.00
41,000.00
f=(cxe)
6,300.00
630.00
30.75
7,410.75
g=(cxe)
12,500.00
19,910.75
1,991.08
21,901.83
1.0000
0.0100
0.1000
0.0100
0.0005
bh
HOK
HOK
HOK
HOK
7,200.00
30,000.00
42,000.00
42,000.00
41,000.00
7,200.00
300.00
4,200.00
420.00
20.50
4,940.50
7,200.00
12,140.50
1,214.05
13,354.55
1.0000
0.0200
0.2000
0.0200
0.01000
bh
HOK
HOK
HOK
HOK
7,200.00
30,000.00
42,000.00
42,000.00
41,000.00
7,200.00
600.00
8,400.00
840.00
410.00
10,250.00
7,200.00
17,450.00
1,745.00
19,195.00
1.0000
0.0150
0.1500
0.0150
0.00075
bh
HOK
HOK
HOK
HOK
0.00
30,000.00
42,000.00
42,000.00
41,000.00
0.00
450.00
6,300.00
630.00
30.75
7,410.75
0.00
7,410.75
741.08
8,151.83
1.0000
0.0200
0.2000
0.0200
0.0010
bh
HOK
HOK
HOK
HOK
3,500.00
30,000.00
42,000.00
42,000.00
41,000.00
3,500.00
600.00
8,400.00
840.00
41.00
9,881.00
3,500.00
13,381.00
1,338.10
14,719.10
1.0000
0.0500
0.5000
0.0500
0.0025
bh
HOK
HOK
HOK
HOK
36,000.00
30,000.00
42,000.00
42,000.00
41,000.00
36,000.00
1,500.00
21,000.00
2,100.00
102.50
24,702.50
36,000.00
60,702.50
6,070.25
66,772.75
1.0000
0.0600
0.6000
0.0600
0.0030
bh
HOK
HOK
HOK
HOK
302,000.00
30,000.00
42,000.00
42,000.00
41,000.00
302,000.00
1,800.00
25,200.00
2,520.00
123.00
29,643.00
302,000.00
331,643.00
33,164.30
364,807.30
1.0000
0.0250
0.2500
0.0250
0.00125
Bh
HOK
HOK
HOK
HOK
9,000.00
30,000.00
42,000.00
42,000.00
41,000.00
9,000.00
750.00
10,500.00
1,050.00
51.25
12,351.25
9,000.00
21,351.25
2,135.13
23,486.38
b
Kaca
Pekerja
Tukang kayu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
L-17
M
M-02
M-42
M-43
M-44
M-47
c
1.1000
0.0150
0.1500
0.0150
0.00075
d
M2
HOK
HOK
HOK
HOK
e
37,500.00
30,000.00
42,000.00
42,000.00
41,000.00
f=(cxe)
g=(cxe)
41,250.00
450.00
6,300.00
630.00
30.75
7,410.75
41,250.00
48,660.75
4,866.08
53,526.83
1.1000
0.0150
0.1500
0.0150
0.00075
bh
HOK
HOK
HOK
HOK
47,500.00
30,000.00
42,000.00
42,000.00
41,000.00
52,250.00
450.00
6,300.00
630.00
30.75
7,410.75
52,250.00
59,660.75
5,966.08
65,626.83
44.0000
11.3800
0.0420
1.5000
0.6200
0.3500
0.0350
0.0300
bh
Kg
m3
HOK
HOK
HOK
HOK
1,700.00
1,030.00
65,000.00
30,000.00
38,500.00
42,000.00
41,000.00
20,179.00
10,300.00
1,397.50
7,800.00
4,812.50
525.00
533.00
13,670.50
31,876.50
45,547.00
4,554.70
50,101.70
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
720.00
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
36,000.00
234.43
3,990.00
10,500.00
18,600.00
13,475.00
1,470.00
1,230.00
34,775.00
50,724.43
85,499.43
8,549.94
94,049.37
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
818.18
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
36,000.00
11,721.40
3,990.00
10,500.00
18,600.00
13,475.00
1,470.00
1,230.00
34,775.00
62,211.40
96,986.40
9,698.64
106,685.04
25.0000
11.3800
0.0420
1.5000
0.6200
0.3500
0.0350
0.0300
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
1,560.00
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
39,000.00
11,721.40
3,990.00
10,500.00
18,600.00
13,475.00
1,470.00
1,230.00
34,775.00
65,211.40
99,986.40
9,998.64
109,985.04
10.0000
11.3800
0.0420
1.5000
0.6200
0.3500
0.0350
bh
Kg
m3
Kg
HOK
HOK
HOK
3,000.00
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
30,000.00
11,721.40
3,990.00
10,500.00
18,600.00
13,475.00
1,470.00
b
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
M-59
M-62
M-64
d
0.0300
50.0000
9.3000
0.0180
1.5000
0.6000
0.4500
0.0450
0.0300
41,000.00
f=(cxe)
1,230.00
34,775.00
g=(cxe)
56,211.40
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
469.88
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
39,000.00
9,579.00
1,710.00
10,500.00
18,600.00
19,250.00
2,100.00
1,230.00
41,180.00
60,789.00
101,969.00
10,196.90
112,165.90
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
720.00
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
36,000.00
9,579.00
1,710.00
10,500.00
18,000.00
17,325.00
1,890.00
1,230.00
38,445.00
57,789.00
96,234.00
9,623.40
105,857.40
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
720.00
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
36,000.00
9,579.00
1,710.00
10,500.00
18,000.00
17,325.00
1,890.00
1,230.00
38,445.00
57,789.00
96,234.00
9,623.40
105,857.40
90,986.40
9,098.64
100,085.04
HOK
11.0000
11.3800
0.0420
1.5000
0.6200
0.3500
0.0350
0.0300
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
2,700.00
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
29,700.00
11,721.40
3,990.00
10,500.00
18,600.00
13,475.00
1,470.00
1,230.00
34,775.00
55,911.40
90,686.40
9,068.64
99,755.04
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
3,240.00
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
35,640.00
11,721.40
3,990.00
10,500.00
18,600.00
13,475.00
1,470.00
1,230.00
34,775.00
61,851.40
96,626.40
9,662.64
106,289.04
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
6,080.00
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
42,134.40
11,721.40
3,990.00
10,500.00
18,600.00
13,475.00
1,470.00
1,230.00
34,775.00
68,345.80
f=(cxe)
g=(cxe)
Total Harga
Keuntungan
Jumlah Total
DIHITUNG1 m2 PASANG LANTAI KERAMIK 40X40 cm warna
Ubin keramik 40x40 cm
Semen Portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
103,120.80
10,312.08
113,432.88
6.9300
11.3800
0.0420
1.5000
0.6200
0.3500
0.0350
0.0300
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
6,560.00
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
45,460.80
11,721.40
3,990.00
10,500.00
18,600.00
13,475.00
1,470.00
1,230.00
34,775.00
71,672.20
106,447.20
10,644.72
117,091.92
1.0100
0.1000
0.2500
0.5000
0.0250
0.0030
0.0000
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
3,272.73
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
36,000.00
11,721.40
3,990.00
10,500.00
18,600.00
13,475.00
1,470.00
1,230.00
34,775.00
62,211.40
96,986.40
9,698.64
106,685.04
bh
Kg
m3
Kg
HOK
HOK
HOK
HOK
5,857.14
1,030.00
95,000.00
7,000.00
30,000.00
38,500.00
42,000.00
41,000.00
41,000.00
11,721.40
3,990.00
10,500.00
18,600.00
13,475.00
1,470.00
1,230.00
34,775.00
67,211.40
101,986.40
10,198.64
112,185.04
m2
m3
HOK
HOK
HOK
HOK
Ls
25,000.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
3,000.00
25,250.00
9,500.00
7,500.00
19,250.00
1,050.00
123.00
0.00
27,923.00
34,750.00
62,673.00
6,267.30
68,940.30
1.0100
0.1000
0.2500
0.5000
0.0250
0.0030
0.0000
m2
m3
HOK
HOK
HOK
HOK
Ls
28,000.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
3,000.00
28,280.00
9,500.00
7,500.00
19,250.00
1,050.00
123.00
0.00
27,923.00
37,780.00
65,703.00
6,570.30
72,273.30
1.0100
0.1000
0.2500
0.5000
0.0250
0.0030
0.0000
m2
m3
HOK
HOK
HOK
HOK
Ls
38,000.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
3,000.00
38,380.00
9,500.00
7,500.00
19,250.00
1,050.00
123.00
0.00
27,923.00
47,880.00
75,803.00
7,580.30
83,383.30
b
Paving block 8 cm, NATURAL
Pasir pasang kali
Pekerja
Tukang batu
Kepala tukang
Mandor
Peralatan
Total
Total Harga
Keuntungan
Jumlah Total
N
N-01
N-02
N-03
N-04
N-06
N-07
N-08
d
1.0100
0.1000
0.2500
0.5000
0.0250
0.0030
0.0000
m2
m3
HOK
HOK
HOK
HOK
Ls
e
35,000.00
95,000.00
30,000.00
38,500.00
42,000.00
41,000.00
3,000.00
Kg
HOK
HOK
0.00
30,000.00
41,000.00
1,500.00
30,000.00
41,000.00
7,500.00
19,250.00
1,050.00
123.00
0.00
27,923.00
44,850.00
0.0500
0.1500
0.0025
0.00
4,500.00
102.50
4,602.50
0.00
Kg
HOK
HOK
75.00
4,500.00
102.50
4,602.50
75.00
4,677.50
467.75
5,145.25
35,350.00
9,500.00
4,602.50
460.25
5,062.75
g=(cxe)
72,773.00
7,277.30
80,050.30
PEKERJAAN PENGECATAN
1 m2 MENGIKIS / MENGEROK PERMUKAAN CAT TEMBOK LAMA
Soda api
0.0500
Pekerja
0.1500
Mandor
0.0025
Total
Total Harga
Keuntungan
Jumlah Total
f=(cxe)
1,500.00
30,000.00
41,000.00
75.00
4,500.00
102.50
4,602.50
75.00
4,677.50
467.75
5,145.25
75.00
4,500.00
102.50
4,602.50
75.00
4,677.50
467.75
5,145.25
0.0800
0.0200
0.0100
0.0400
0.0400
0.0040
0.0025
Kg
Kg
Kg
HOK
HOK
HOK
HOK
12,000.00
6,000.00
1,500.00
30,000.00
35,500.00
42,000.00
41,000.00
960.00
120.00
15.00
1,200.00
1,420.00
168.00
102.50
2,890.50
1,095.00
3,985.50
398.55
4,384.05
0.1500
0.1700
0.1700
0.0700
0.0750
0.0075
0.0025
Kg
Kg
Kg
HOK
HOK
HOK
HOK
12,000.00
35,000.00
35,000.00
30,000.00
35,500.00
42,000.00
41,000.00
1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Cat meni
0.2000
Kg
18,000.00
Plamir
0.1500
Kg
12,000.00
Cat dasar
0.1700
Kg
35,000.00
Cat Penutup ( 2 kali )
0.2600
Kg
35,000.00
Pekerja
0.0700
HOK
30,000.00
Tukang cat
0.0090
HOK
35,500.00
Kepala tukang
0.0060
HOK
42,000.00
Mandor
0.0025
HOK
41,000.00
Total
1,800.00
5,950.00
5,950.00
2,100.00
2,662.50
315.00
102.50
5,180.00
13,700.00
18,880.00
1,888.00
20,768.00
3,600.00
1,800.00
5,950.00
9,100.00
2,100.00
319.50
252.00
102.50
2,774.00
20,450.00
f=(cxe)
g=(cxe)
Total Harga
Keuntungan
Jumlah Total
N-09
N-11
N-12
N-13
23,224.00
2,322.40
25,546.40
1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 3 Lapis Cat Penutup)
Cat meni
0.2000
Kg
18,000.00
Plamir
0.1500
Kg
12,000.00
Cat dasar
0.1700
Kg
35,000.00
Cat Penutup ( 3 kali )
0.3500
Kg
35,000.00
Pekerja
0.0700
HOK
30,000.00
Tukang cat
0.1050
HOK
35,500.00
Kepala tukang
0.0040
HOK
42,000.00
Mandor
0.0025
HOK
41,000.00
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PELABURAN BIDANG KAYU DENGAN POLITUR
Politur
Politur jadi
Ampelas
Tukang cat
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
0.1500
0.3720
2.0000
0.0600
0.0160
0.0025
Ltr
Ltr
Lbr
HOK
HOK
HOK
12,600.00
27,000.00
6,000.00
35,500.00
42,000.00
41,000.00
3,600.00
1,800.00
5,950.00
12,250.00
2,100.00
3,727.50
168.00
102.50
6,098.00
23,600.00
29,698.00
2,969.80
32,667.80
1,890.00
10,044.00
12,000.00
2,130.00
672.00
102.50
2,904.50
23,934.00
26,838.50
2,683.85
29,522.35
0.1500
0.0500
0.1000
Ltr
Kg
Lbr
1,100.00
30,000.00
41,000.00
385.00
3,000.00
246.00
3,246.00
385.00
3,631.00
363.10
3,994.10
12,000.00
12,000.00
6,000.00
1,800.00
600.00
600.00
b
Kuas
Pekerja
Tukang cat
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
N-14
N-15
N-19
N-20
N-21
d
0.0100
0.1600
0.1600
0.0160
0.0025
Bh
HOK
HOK
HOK
HOK
e
9,000.00
30,000.00
35,500.00
42,000.00
41,000.00
f=(cxe)
g=(cxe)
4,800.00
5,680.00
672.00
102.50
11,254.50
3,090.00
14,344.50
1,434.45
15,778.95
1 m2 PENGECATAN BIDANG TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Plamir
0.1000
Kg
12,000.00
Cat dasar
0.1000
Kg
12,000.00
Cat Penutup ( 2 kali )
0.2600
Kg
12,000.00
Pekerja
0.0200
HOK
30,000.00
600.00
Tukang cat
0.0630
HOK
35,500.00
2,236.50
Kepala tukang
0.0063
HOK
42,000.00
264.60
Mandor
0.0025
HOK
41,000.00
102.50
Total
3,203.60
Total Harga
Keuntungan
Jumlah Total
1 m2 PENGECATAN BIDANG TEMBOK LAMA ( 1 Lapis Cat dasar; 2 Lapis Cat Penutup )
Cat dasar
0.1200
Kg
12,000.00
Cat Penutup ( 2 kali )
0.1800
Kg
12,000.00
Pekerja
0.0280
HOK
30,000.00
Tukang cat
0.0420
HOK
35,500.00
Kepala tukang
0.0042
HOK
42,000.00
Mandor
0.0025
HOK
41,000.00
Total
Total Harga
Keuntungan
Jumlah Total
1 m2 PEMASANGAN WALL PAPER
Wall paper
Perekat
Pekerja
Tukang cat
Kepala tukang
Mandor
Total
Total Harga
Keuntungan
Jumlah Total
90.00
1.2000
0.2000
0.0200
0.2000
0.0020
0.0025
m3
Kg
HOK
HOK
HOK
HOK
1,200.00
1,200.00
3,120.00
5,520.00
8,723.60
872.36
9,595.96
1,440.00
2,160.00
840.00
1,491.00
176.40
102.50
2,609.90
3,600.00
6,209.90
620.99
6,830.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-
Kg
Bh
HOK
HOK
HOK
HOK
18,000.00
9,000.00
30,000.00
35,500.00
42,000.00
41,000.00
1,800.00
90.00
600.00
7,100.00
840.00
410.00
8,950.00
1,890.00
10,840.00
1,084.00
11,924.00
1,800.00
90.00
2,800.00
7,500.00
7,987.50
945.00
307.50
16,740.00
4,690.00
21,430.00
2,143.00
Jumlah Total
N-22
N-23
1 m2 PENGECATAN PERMUKAAN BAJA LAPIS SENG GALBANI SECARA MANUAL (4 lapis cat konvensional, tebal 200 um)
Cat dasar
0.1100
Kg
Cat antara
0.1700
Kg
Cat penutup
0.0800
Kg
Pekerja
0.5000
HOK
0.00
Tukang cat
0.8000
HOK
0.00
Kepala tukang
0.3000
HOK
0.00
Mandor
0.2000
HOK
0.00
Total
0.00
Total Harga
1 m2 PENGECATAN PERMUKAAN BAJA LAPIS GALBANI SECARA MANUAL (1 lapis cat mutakhir, tebal 200 um)
Cat
0.3000
Kg
Pekerja
0.0060
HOK
0.00
Tukang cat
0.0600
HOK
0.00
23,573.00
0.00
0.00
0.00
0.00
-
0.00
b
Kepala tukang
Mandor
Total
Total Harga
d
0.0120
0.0060
HOK
HOK
f=(cxe)
g=(cxe)
0.00
0.00
0.00
0.00
-
KOTA
TASIKMALAYA
PROPINSI :
JAWA BARAT
PROSES :
1 Agregat pecah tersaring ditimbun disepanjang jalan oleh pemasok
2 Membentuk ulang Permukaan LamaJalan & menghampar Agregat
dengan tenaga Manusia
3 Jalan disiram dengan air dengan truk air
4 Pemadatan dalam 2 lapis dengan mesin gilas roda baja sampai100 % MDD
5 Perapihan dengan tenaga manusia
PEKERJA
P
E
K
E
R
J
A
P
E
R
A
L
A
T
A
N
2.00
1.00
1.00
1.00
1.00
60.00
Jumlah
M3
M3
Set
PERALATAN
Hari
Kerja
VOLUME/ QUANTITY
SATUAN
1.00
1.00
51.50
20.50
0.24
Jam
Kerja
1.00
1.00
Biaya
( Rp.)
41,000.00
42,000.00
38,500.00
35,500.00
30,000.00
30,000.00
HARGA
SATUAN
( Rp. / Unit )
Total Vol
TANGGAL :
5.00
5.00
Sub Total
( Rp.)
82,000.00
42,000.00
38,500.00
35,500.00
30,000.00
1,800,000.00
PEKERJA
BIAYA
( Rp.)
90,000.00
50,000.00
60,000.00
Harga
(RP/Jam)
155,327.33
MATERIAL
Biaya
( Rp.)
70,100.00
83,900.00
KOTA
TASIKMALAYA
KODE
5,674,400.00
Sub Total
( Rp.)
350,500.00
419,500.00
PERALATAN
Total Rp.
Keuntungan mak
Total Rp.
Per M3
2,028,000.00
SUB. TOTAL
( Rp.)
4,635,000.00
1,025,000.00
14,400.00
PROPINSI :
JAWA BARAT
DISIAPKAN OLEH :
DINAS PEKERJAAN UMUM
KOTA TASIKMALAYA
770,000.00
8,472,400.00
847,240.00
9,319,640.00
KODE
K.513
TANGGAL :
ANGGAPAN :
1.Menggunakan Tenaga Manusia ( 60M3 /Hari )
2. Material ditimbun disepanjang jalan oleh pemasok
3. Dikirim kerikil galian / sungai tersaring/bergradasi yg termurah
4. Dihampar dan dipadatkan sampai tebal 10 CM
5. Dihampar dan dipadatkan 600M2/hari ;koefisien pemadat = 1,2
6. Umur alat bantu rata rata 1 bulan /orang/set@3 Alat
7. Gradasi bahan lapis pondasi bawah klas B semua harus melalui saringan 62,5 mm
PROSES :
1. Agregat tersaring bergradasi ditimbun disepanjang jalan
oleh pemasok
2. membentuk ulang permukaan lama jalan dan hampar agr dng
tenaga manusia
3. Jalan disiram air dengan truk air
4. Pemadatan dalam 2 lapis dengan mesin gilas roda baja
sampai 100 % MDD
5. Perapihan jalan dengan tenaga manusia
PEKERJA
Vol
Mandor
Operator Terampil
Pembantu Operator
Supir Truck
Pembantu Supir
Buruh Tak Terlatih
Upah
(Rp/Hr/Org)
2.00
1.00
1.00
1.00
1.00
60.00
60
M3
P
E
K
E
R
J
A
1.00
1.00
1.00
1.00
1.00
1.00
Total Vol
( Org/hr )
Satuan
Jumlah
DISIAPKAN OLEH :
DINAS PEKERJAAN UMUM
KOTA TASIKMALAYA
ANGGAPAN :
1. Menggunakan tenaga manusia (60M3/hari)
2.Material ditimbun disepanjang jalan oleh pemasok
3.Dikirim batu quarry/kerikil sungai pecah tersaring yang termusah
4.Dihampar dengan tenaga manusia dalam 2 lapis dan dipadatkan sampai tebal padat 10 cm
5.Dihampar dan dipadatkan 600m2/hari:koefisien pemadatan = 1,2
6. Umur alat bantu rata - rata 1 bulan/orang/set@3 alat
7. Gradasi bahan lapis pondasi bawah klas A semua harus melalui saringan 75 mm sesuai rev.spek.umum
Hari
Mandor
Operator Terampil
Pembantu Operator
Supir Truck
Pembantu Supir
Buruh Tak Terlatih
MATERIAL
M
A
T
E
R
I
A
L
Vol
KODE
KODE
K.511
Hari
2.00
1.00
1.00
1.00
1.00
60.00
Total Vol
( Org/hr )
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
60.00
Upah
(Rp/Hr/Org)
41,000.00
42,000.00
38,500.00
35,500.00
30,000.00
30,000.00
Biaya
( Rp.)
Sub Total
( Rp.)
82,000.00
42,000.00
38,500.00
35,500.00
30,000.00
1,800,000.00
MATERIAL
M
A
T
E
R
I
A
L
Satuan
PERALATAN
P
E
R
A
L
A
T
A
N
Jumlah
M
A
T
E
R
I
A
L
Batu pecah ( 10 - 15 )
Batu pecah ( 5-7 )
pasir
Alat Bantu
PERALATAN
P
E
R
A
L
A
T
A
N
5.00
5.00
MATERIAL
Biaya
( Rp.)
70,100.00
83,900.00
KOTA
KODE
TASIKMALAYA
(
)
5,054,400.00
Sub Total
( Rp.)
350,500.00
419,500.00
PERALATAN
Total Rp.
Keuntungan mak
Total Rp.
Per M3
2,028,000.00
Sub Total
( Rp.)
5,040,000.00
14,400.00
770,000.00
7,852,400.00
785,240.00
8,637,640.00
KODE
K.516
TANGGAL :
ANGGAPAN :
1. menggunakan tenaga orang 400 m2 per hari
2. material dikirim ke lokasi pekerjaan oleh supplier
3. material sudah dipecahkan / batu pecah
4. Tanah dasar / sub grade sudah dipersiapkan
5. Dipadatkan sampai tebal 20 cm
PROSES :
1. Material disiapkan dilokasi pekerjaan oleh pemasok
2. Menghampar pasir setebal 5 cm
3. Batu pecah berukuran besar ( 10-15 cm )
4. Batu pecah yang lebih kecil mengisi rongga diatas
nya, kemudian digilas dengan mesin gilas
MATERIAL
1.00
1.00
PEKERJA
Biaya
( Rp.)
70,000.00
60,000.00
Harga
( Rp/Jam )
143,960.67
PROPINSI :
JAWA BARAT
Mandor
Pembantu Operator
Buruh tak Terlatih
Jam
Kerja
60
M3
P
E
K
E
R
J
A
72.00
0.24
Hari
Kerja
1.00
1.00
VOLUME/ QUANTITY
SATUAN
PEKERJA
Total Vol
M3
Set
Jumlah
Harga
Satuan
( Rp. / Unit )
Vol
Hari
3.00
1.00
99.00
Jumlah
Total Vol
( Org/hr )
1.00
1.00
1.00
Satuan
50.00
20.00
30.00
4.00
1.00
Total Vol
m3
m3
m3
set
50.00
20.00
30.00
4.00
Hari
Kerja
Jumlah
3.00
1.00
99.00
Jam
Kerja
1.00
Upah
(Rp/Hr/Org)
41,000.00
38,500.00
30,000.00
HARGA
SATUAN
( Rp. / Unit )
85,000.00
98,000.00
65,000.00
60,000.00
Harga
(RP/Jam)
5.00
88,000.00
Biaya
( Rp.)
Sub Total
( Rp.)
123,000.00
38,500.00
2,970,000.00
PEKERJA
BIAYA
( Rp.)
3,131,500.00
SUB. TOTAL
( Rp.)
4,250,000.00
1,960,000.00
1,950,000.00
240,000.00
MATERIAL
Biaya
( Rp.)
8,400,000.00
Sub Total
( Rp.)
440,000.00
PERALATAN
440,000.00
VOLUME/ QUANTITY
SATUAN
Total Rp.
Keuntungan mak
Total Rp.
400
M3
32,921.63
KOTA
TASIKMALAYA
M
A
T
E
R
I
A
L
Hari
1.00
2.00
2.00
1.00
1.00
6.00
Jumlah
DISIAPKAN OLEH :
DINAS PEKERJAAN UMUM
KOTA TASIKMALAYA
1.00
1.00
1.00
Upah
(Rp/Hr/Org)
1.00
2.00
2.00
1.00
1.00
6.00
HARGA
SATUAN
( Rp. / Unit )
Total Vol
Jam
Kerja
1.00
1.00
1.00
90,000.00
60,000.00
Harga
(RP/Jam)
5.00
5.00
5.00
150
M3
145,661.27
Biaya
( Rp.)
41,000.00
42,000.00
38,500.00
35,500.00
30,000.00
30,000.00
195.00
0.24
Hari
Kerja
Jumlah
VOLUME/ QUANTITY
SATUAN
TANGGAL :
41,000.00
84,000.00
77,000.00
35,500.00
30,000.00
180,000.00
PEKERJA
BIAYA
( Rp.)
447,500.00
SUB. TOTAL
( Rp.)
17,550,000.00
14,400.00
MATERIAL
Biaya
( Rp.)
216,200.00
70,100.00
83,900.00
Per M3
Sub Total
( Rp.)
17,564,400.00
Sub Total
( Rp.)
1,081,000.00
350,500.00
419,500.00
PERALATAN
Total Rp.
Keuntungan mak
Total Rp.
1,851,000.00
19,862,900.00
1,986,290.00
21,849,190.00
KOTA
TASIKMALAYA
PROPINSI :
JAWA BARAT
KODE
DISIAPKAN OLEH :
DINAS PEKERJAAN UMUM
KOTA TASIKMALAYA
KODE
K.521
TANGGAL :
ANGGAPAN :
1. Menggunakan Tenaga manusia , ( 60 M3/hari)
2. Material Ditimbun Disepanjang Jalan Oleh Pemasok
3. Dikirim batu quarry/kerikil sungai pecah tersaring yang termurah
4. Dihampar dan Dipadatkan sampai tebal padat 10 cm
5. Dihampar dan Dipadatkan 600 m2/hari
6. Gradasi agregat lapis pondasi atas klas A semua harus melalui saringan 37,5 mm
sesuai rev. spek. Umum B.M Maret 89- buku 3
PROSES :
Pekerjaan ini harus dilaksanakan sesuai :
1. Agregat pecah tersaring ditimbun di sepanjang jalan
oleh pemasok
2. Agregat dihampar oleh tenaga manusia
3. jalan disiram air dengan truck air
4. Pemadatan dengan mesin gilas roda baja
PEKERJA
1.00
1.00
1.00
1.00
1.00
1.00
M3
Set
KODE
Total Vol
( Org/hr )
Satuan
PERALATAN
P
E
R
A
L
A
T
A
N
Vol
Mandor
Operator Terampil
Pembantu Operator
Supir Truck
Pembantu Supir
Buruh Tak Terlatih
MATERIAL
KODE
K.520
ANGGAPAN :
1. Menggunakan Alat Berat, ( 150 M3/hari)
2. Material Ditimbun Disepanjang Jalan Oleh Pemasok
3. Dihampar dan Diapdatkan sampai tebal padat 10 cm
4. Koefisien pemadatan = 1,3
PROSES :
Pekerjaan ini harus dilaksanakan sesuai :
1. Bab satuan pekerjaan ini, spesifikasi umum jalan
Kabupaten Bina Marga Maret 1992.
2. Atau Addendum yang berkalu.
P
E
K
E
R
J
A
Per M2
PROPINSI :
JAWA BARAT
PEKERJA
11,971,500.00
1,197,150.00
13,168,650.00
Vol
Hari
Total Vol
( Org/hr )
Upah
(Rp/Hr/Org)
Biaya
( Rp.)
Sub Total
( Rp.)
P
E
K
E
R
J
A
M
A
T
E
R
I
A
L
Mandor
Operator Terampil
Pembantu Operator
Supir Truck
Pembantu Supir
Buruh Tak Terlatih
1.00
1.00
1.00
1.00
1.00
1.00
MATERIAL
Satuan
M3
M3
Set
PERALATAN
P
E
R
A
L
A
T
A
N
2.00
1.00
1.00
1.00
1.00
60.00
1.00
1.00
VOLUME/ QUANTITY
SATUAN
HARGA
SATUAN
( Rp. / Unit )
Total Vol
Jam
Kerja
1.00
1.00
P
E
K
E
R
J
A
Mandor
Operator Terampil
Pembantu Operator
Supir
Pembantu Supir
Buruh Tak Terlatih
Buruh Terlatih
MATERIAL
M
A
T
E
R
I
A
L
P
E
5.00
5.00
2,028,000.00
SUB. TOTAL
( Rp.)
6,390,000.00
375,000.00
144,000.00
MATERIAL
Biaya
( Rp.)
70,100.00
83,900.00
60
M3
6,909,000.00
Sub Total
( Rp.)
350,500.00
419,500.00
770,000.00
9,707,000.00
970,700.00
10,677,700.00
Per M3
KOTA
TASIKMALAYA
KODE
DISIAPKAN OLEH :
DINAS PEKERJAAN UMUM
KOTA TASIKMALAYA
KODE
K.618
TANGGAL :
ANGGAPAN :
1. Menggunakan tenaga manusia
2. Material dikirim kelokasi pekerjaan oleh pemasok
3. Tebal perkerasan 5 cm
4. Kapasitas penghamparan 2800 m2/minngu ( 6 hari)
Vol
Hari
2.00
2.00
2.00
1.00
1.00
66.00
2.00
Jumlah
Total Vol
( Org/hr )
3.00
3.00
3.00
3.00
3.00
3.00
3.00
Satuan
M3
M3
M3
M3
Kg
Ltr
Set
PERALATAN
Hari
Kerja
PEKERJA
BIAYA
( Rp.)
PERALATAN
Total Rp.
Keuntungan mak
Total Rp.
PROPINSI :
JAWA BARAT
PROSES :
1. Semprotkan aspal prime coat 0,48 Kg/m2
2. Hampar batu pecah 3-5 cm, 25 m2/m3
3. Hampar batu pecah 2-3 cm, 45 m2/m3
4. Setiap lapis batu dipadatkan
5. Semprotkan aspal, 2,5 Kg/m2
6. Hampar batu pecah 1-2 cm, 90 m2/m3
7. Semprotkan aspal, 1,5 Kg/m2
8. Hampar pasir (blinder), 400m2/m3
PEKERJA
82,000.00
42,000.00
38,500.00
35,500.00
30,000.00
1,800,000.00
90,000.00
50,000.00
60,000.00
Harga
(RP/Jam)
177,961.67
41,000.00
42,000.00
38,500.00
35,500.00
30,000.00
30,000.00
71.00
7.50
2.40
Hari
Kerja
Jumlah
2.00
1.00
1.00
1.00
1.00
60.00
Jumlah
1.00
1.00
6.00
6.00
6.00
3.00
3.00
198.00
6.00
Total Vol
56.00
31.11
15.55
11.20
6,270.00
450.00
8.16
Jam
Kerja
3.00
3.00
Upah
(Rp/Hr/Org)
41,000.00
42,000.00
38,500.00
35,500.00
30,000.00
30,000.00
32,500.00
HARGA
SATUAN
( Rp. / Unit )
115,000.00
125,000.00
135,000.00
122,500.00
8,064.52
3,500.00
60,000.00
Harga
(RP/Jam)
15.00
15.00
70,100.00
47,100.00
Biaya
( Rp.)
Sub Total
( Rp.)
246,000.00
252,000.00
231,000.00
106,500.00
90,000.00
5,940,000.00
195,000.00
PEKERJA
BIAYA
( Rp.)
7,060,500.00
SUB. TOTAL
( Rp.)
6,440,000.00
3,888,750.00
2,099,250.00
1,372,000.00
50,564,516.13
1,575,000.00
489,600.00
MATERIAL
Biaya
( Rp.)
1,051,500.00
706,500.00
66,429,116.13
Sub Total
( Rp.)
R
A
L
A
T
A
N
Dump Truck 3 - 4 M3
1.00
VOLUME/ QUANTITY
SATUAN
KOTA
TASIKMALAYA
M
A
T
E
R
I
A
L
PERALATAN
P
E
R
A
L
A
T
A
N
Aspalt Sprayer
Aspalt Finisher
Tandem Roller 6 - 8 Ton
Pnermatic Roller 8 - 15 Ton
Compressor 4000-6500 l/m
VOLUME/ QUANTITY
SATUAN
1,258,500.00
PERALATAN
Total Rp.
Keuntungan mak
Total Rp.
Per M2
DISIAPKAN OLEH :
DINAS PEKERJAAN UMUM
KOTA TASIKMALAYA
KODE
3,016,500.00
76,506,116.13
7,650,611.61
84,156,727.74
KODE
K.641
TANGGAL :
ANGGAPAN :
1. Menggunakan peralatan Berat
2. Campuran lataston tersedia di lokasi pekerjaan
3. Tebal lapisan padat 5 cm
4. Berat volume laston padat = 2,23 t/m3
PROSES :
1. Permukaan jalan harus bersih dan kering
2. sebelum penghamparan permukaan jalan diberi prime
tack coat 1 kg/m2
3. Suhu pemadatan awal 120 C, pemadatan akhir 60 C
4. Penghamparan laston menggunakan asphalt Finisher
5. Pemadatan awal menggunakan tandem roller 4-6 ton
sebanyak 4-6 kali lintasan kemudian diikuti PTR 1012 ton dan diakhiri dengan TR lagi
PEKERJA
Vol
MATERIAL
60,111.95
83,900.00
PROPINSI :
JAWA BARAT
Mandor
Operator Terlatih
Operator semi Terlatih
Buruh tak Terlatih
Buruh Terlatih
15.00
1400
M3
P
E
K
E
R
J
A
3.00
Hari
1.00
4.00
2.00
10.00
5.00
Total Vol
( Org/hr )
1.00
1.00
1.00
1.00
1.00
Upah
(Rp/Hr/Org)
1.00
4.00
2.00
10.00
5.00
41,000.00
42,000.00
38,500.00
30,000.00
32,500.00
120.00
1,078.00
Ton
kg
120.00
1,078.00
HARGA
SATUAN
( Rp. / Unit )
690,000.00
8,064.52
360.00
5.00
Ltr
Set
360.00
5.00
3,500.00
60,000.00
Jumlah
Satuan
Total Vol
Hari
Kerja
Jumlah
1.00
1.00
1.00
1.00
1.00
Jam
Kerja
1.00
1.00
1.00
1.00
1.00
Harga
(RP/Jam)
3.00
5.00
6.00
6.00
3.00
47,100.00
110,700.00
88,000.00
86,000.00
47,000.00
Biaya
( Rp.)
Sub Total
( Rp.)
41,000.00
168,000.00
77,000.00
300,000.00
162,500.00
PEKERJA
BIAYA
( Rp.)
82,800,000.00
8,693,548.39
1,260,000.00
300,000.00
MATERIAL
Biaya
( Rp.)
T. 5 cm
T. 4 cm
97,816.02
58,689.61
93,053,548.39
Sub Total
( Rp.)
141,300.00
553,500.00
528,000.00
516,000.00
141,000.00
PERALATAN
Total Rp.
Keuntungan mak
Total Rp.
1076
M2
748,500.00
SUB. TOTAL
( Rp.)
1,879,800.00
95,681,848.39
9,568,184.84
105,250,033.23
Per M2
Per M2
88,034.41
KOTA
KODE
TASIKMALAYA
(
)
ANGGAPAN :
1. Penyemprotan aspal 0.35 kg / m2
2. Kapasitas kerja 8.000 m2/ hari
KODE
AN. 18
TANGGAL :
3.
MATERIAL
M
A
T
E
R
I
A
L
Kuantitas
7,104.00
2,032.00
2.00
Total Vol
( Org/hr )
1.00
1.00
1.00
1.00
Unit
1.00
20.00
2.00
2.00
Kg
Ltr
Set
7,104.00
2,032.00
2.00
2.00
2.00
Jam
Kerja
1.00
1.00
10.00
10.00
KOTA
KODE
TASIKMALAYA
(
)
PROSES :
1. Permukaan jalan harus rata, bersih dan kering
2. hamparan harus di tack coat
3. pemadatan awal 120 derajat Celcius
4. Pemadatan akhir 60 derajat celcius
5. ATB menggunakan aspalt finisher
M
A
T
E
R
I
A
L
PERALATAN
P
E
Aspalt finisher
802,000.00
SUB. TOTAL
( Rp.)
57,290,322.58
7,112,000.00
120,000.00
MATERIAL
Biaya
( Rp.)
47,100.00
47,000.00
64,522,322.58
Sub Total
( Rp.)
471,000.00
470,000.00
941,000.00
66,265,322.58
6,626,532.26
72,891,854.84
Ltr
PER LITER
PROPINSI :
JAWA BARAT
MATERIAL
TENAGA
BIAYA
( Rp.)
PERALATAN
Total Rp.
Keuntungan mak
Total Rp.
Mandor
Tukang
Pekerja
Operator
Pembantu Operator
Supir Terampil
Pembantu Supir
Sub Total
( Rp.)
41,000.00
600,000.00
84,000.00
77,000.00
8,064.52
3,500.00
60,000.00
8000
LITER
9,111.48
P
E
K
E
R
J
A
Biaya
( Rp.)
41,000.00
30,000.00
42,000.00
38,500.00
Harga
(RP/Jam)
Jumlah Per
Upah
(Rp/Hr/Org)
HARGA
SATUAN
( Rp. / Unit )
Total Vol
Hari
Kerja
Jumlah
VOLUME/ QUANTITY
SATUAN
Ltr
Hari
1.00
20.00
2.00
2.00
Aspalt
Minyak Tanah
Alat Bantu
PERALATAN
P
E
R
A
L
A
T
A
N
8,000.00
Vol
KODE
AN. 20
TANGGAL :
ANGGAPAN :
1. menggunakan peralatan berat
2. Campuran ATB diangkut dari lokasi AMP dengan dump truck
jarak angkut +/- 20 km
3. Berat volume ATB padat 2,3 ton / m3
4. Tebal lapisan padat 5 cm
67.00
Vol
m3
Hari
1.00
2.00
12.00
4.00
4.00
6.00
6.00
Kuantitas
150.00
2.00
Total Vol
( Org/hr )
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Unit
ton
Set
150.00
2.00
1.00
Jam
Kerja
1.00
684,000.00
60,000.00
Harga
(RP/Jam)
5.00
Biaya
( Rp.)
41,000.00
38,500.00
30,000.00
42,000.00
38,500.00
35,500.00
30,000.00
HARGA
SATUAN
( Rp. / Unit )
Total Vol
Hari
Kerja
Jumlah
1.00
2.00
12.00
4.00
4.00
6.00
6.00
Upah
(Rp/Hr/Org)
110,700.00
Sub Total
( Rp.)
41,000.00
77,000.00
360,000.00
168,000.00
154,000.00
213,000.00
180,000.00
1,193,000.00
SUB. TOTAL
( Rp.)
BIAYA
( Rp.)
102,600,000.00
120,000.00
102,720,000.00
Sub Total
( Rp.)
Biaya
( Rp.)
553,500.00
R
A
L
A
T
A
N
1.00
1.00
1.00
6.00
VOLUME/ QUANTITY
SATUAN
1.00
1.00
1.00
1.00
67
M3
1,777,616.42
88,880.82
4,360,000.00
108,273,000.00
10,827,300.00
119,100,300.00
m3
m2
KOTA
KODE
TASIKMALAYA
(
)
PROSES :
KODE
AN. 15
TANGGAL :
ANGGAPAN :
1. Kedalaman rata - rata 25 cm
2. Material didatangkan oleh suplier
3. Kapasitas rata - rata 160 m2/hari
Mandor
Pekerja
Operator
Sopir Truk
Pembantu Supir
Pembantu Operator
MATERIAL
PERALATAN
P
L
A
T
A
N
440,000.00
430,000.00
419,500.00
2,517,000.00
PROPINSI :
JAWA BARAT
M
A
T
E
R
I
A
L
88,000.00
86,000.00
83,900.00
83,900.00
PERALATAN
Total Rp.
Keuntungan mak
Total Rp.
Jumlah Per
Jumlah Per
P
E
K
E
R
J
A
5.00
5.00
5.00
30.00
VOLUME/ QUANTITY
SATUAN
160.00
Vol
M2
Hari
2.00
28.00
1.00
1.00
1.00
1.00
Kuantitas
24.00
8.00
16.00
0.50
Total Vol
( Org/hr )
1.00
1.00
1.00
1.00
1.00
1.00
Unit
Jumlah
1.00
1.00
2.00
28.00
1.00
1.00
1.00
1.00
M3
M3
M3
Set
24.00
8.00
16.00
0.50
Jam
Kerja
5.00
5.00
Harga
(RP/Jam)
5.00
5.00
88,000.00
83,900.00
1,068,000.00
SUB. TOTAL
( Rp.)
BIAYA
( Rp.)
2,040,000.00
784,000.00
1,040,000.00
30,000.00
3,894,000.00
Sub Total
( Rp.)
Biaya
( Rp.)
440,000.00
419,500.00
PERALATAN
Total Rp.
Keuntungan mak
Total Rp.
Jumlah Per
PROPINSI :
JAWA BARAT
PROSES :
1. Bab satuan pekrejaan ini1. Digali persegi sampai dasar yg mantap
2. mengganti bahan lpa dan dipadatkan
3. Permukaan dibersihkan
4. Dilapisi pri,e/resapa dan ditutup lapis permukaan batu
Sub Total
( Rp.)
82,000.00
840,000.00
42,000.00
35,500.00
30,000.00
38,500.00
85,000.00
98,000.00
65,000.00
60,000.00
160
M2
Biaya
( Rp.)
41,000.00
30,000.00
42,000.00
35,500.00
30,000.00
38,500.00
HARGA
SATUAN
( Rp. / Unit )
Total Vol
Hari
Kerja
Upah
(Rp/Hr/Org)
40,022.81
M2
KODE
859,500.00
5,821,500.00
582,150.00
6,403,650.00
KODE
K.880
DISIAPKAN OLEH :
DINAS PEKERJAAN UMUM
KOTA TASIKMALAYA
ANGGAPAN :
1. Menggunakan tenaga manusia ( 35/M2/Hari )
2. Harga bahan franco/ siap dilokasi
3. tebal lapen rata - rata 5 cm
4. Lubang diperbaiki dengan lapen base 4 cm
5. Jumlaj pemakaian bahan untuk :
Lapen Base
- Batu pokok 3-5 cm
25m2/m3
- Batu pengunci 1-2 cm
64m2/m3
- Batu penutup 0,5-1 cm
0m2/m3
- Aspal
2 kg/m2
Lapen Base
20m2/m3
64m2/m3
112m2/m3
4 kg/m2
TANGGAL :
PEKERJA
P
E
K
E
R
J
A
1.00
1.00
1.00
8.00
2.00
Jumlah
1.00
1.00
1.00
Mandor
Operator Terampil
Operator Semi Terampil
Buruh Tak Terampil
Buruh Terampil
MATERIAL
M
A
T
E
R
I
A
L
Campuran lataston
aspalt bitumen untuk prime coat/
tack coat
minyak aspalt ( pengencer )
Alat bantu # 3 Set
PERALATAN
P
E
R
Asphalt finisher
Roller 3 Whell 8-10 ton
Pneumatic Roller 8 - 15 ton
1.00
1.00
1.00
8.00
2.00
Jam
Kerja
115,000.00
135,000.00
122,500.00
8,064.52
Harga
(RP/Jam)
5.00
3.00
5.00
5.00
3.00
5.00
113,625.49
Biaya
( Rp.)
Sub Total
( Rp.)
41,000.00
35,500.00
30,000.00
30,000.00
32,500.00
HARGA
SATUAN
( Rp. / Unit )
Total Vol
35
M2
41,000.00
35,500.00
30,000.00
240,000.00
65,000.00
PEKERJA
BIAYA
( Rp.)
MATERIAL
Biaya
( Rp.)
70,100.00
47,100.00
83,900.00
KOTA
TASIKMALAYA
KODE
2,292,556.45
Sub Total
( Rp.)
350,500.00
141,300.00
419,500.00
PERALATAN
Total Rp.
Keuntungan mak
Total Rp.
Per M2
411,500.00
SUB. TOTAL
( Rp.)
368,000.00
162,000.00
36,750.00
1,725,806.45
PROPINSI :
JAWA BARAT
P
E
K
E
R
J
A
Upah
(Rp/Hr/Org)
3.20
1.20
0.30
214.00
Hari
Kerja
Jumlah
VOLUME/ QUANTITY
SATUAN
PROSES :
1. Permukaan jalan harus jering, rata dan bersih
2. sebelum penghamparan harus diberi prime coat /
tack coat 0,25 - 0,50 kg / m2
3. suhu pemadatan awal 120 C, pemadatan ahir 60 C
4. Pemadatan awal dilakukan dengan tandem roller 8
ton, kemudian diikuti pneumatic roller 10 - 12 ton dan
diakhiri dengan tandem roller diakhiri dg tandem roller
PEKERJA
1.00
1.00
1.00
1.00
1.00
M3
M3
M3
Kg
Total Vol
( Org/hr )
Satuan
PERALATAN
P
E
R
A
L
A
T
A
N
Hari
Mandor
Supir
Pembantu Supir
Buruh Tak Terlatih
Buruh Terlatih
MATERIAL
M
A
T
E
R
I
A
L
Vol
DISIAPKAN OLEH :
DINAS PEKERJAAN UMUM
KOTA TASIKMALAYA
911,300.00
3,615,356.45
361,535.65
3,976,892.10
KODE
K.636
TANGGAL :
ANGGAPAN :
1. Menggunakan peralatan berat
2. Campuran lataston tersedia di lokasi pekerjaan
3. Tebal Padat 3,0 cm
4. Density = 2,23 ton / m3
VOL
HARI
1.00
4.00
2.00
6.00
4.00
JUMLAH
TOTAL VOL
( Org/hr )
1.00
1.00
1.00
1.00
1.00
SATUAN
1.00
4.00
2.00
6.00
4.00
KODE
Upah
(Rp/Hr/Org)
41,000.00
42,000.00
38,500.00
30,000.00
32,500.00
HARGA
SATUAN
( Rp. / Unit )
BIAYA
( Rp.)
SUB. TOTAL
( Rp.)
41,000.00
168,000.00
77,000.00
180,000.00
130,000.00
PEKERJA
BIAYA
( Rp.)
120.00
522.00
Ton
Kg
690,000.00
8,064.52
82,800,000.00
4,209,677.42
174.00
3.00
Ltr
Set
3,500.00
60,000.00
609,000.00
180,000.00
JUMLAH
1.00
1.00
1.00
HARI
KERJA
1.00
1.00
1.00
JAM
KERJA
HARGA
(RP/JAM)
5.00
6.00
6.00
110,700.00
88,000.00
86,000.00
MATERIAL
BIAYA
( Rp.)
553,500.00
528,000.00
516,000.00
596,000.00
SUB. TOTAL
( Rp.)
87,798,677.42
SUB. TOTAL
( Rp.)
A
L
A
T
A
N
1.00
1.00
1.00
1.00
3.00
2.50
47,100.00
47,000.00
141,300.00
117,500.00
PERALATAN
Total Rp.
Keuntungan max
Total Rp.
volume / :
Quantity
Satuan : M2
1,740.00
57,055.22
Per M2
1,856,300.00
90,250,977.42
9,025,097.74
99,276,075.16
KEUNTUNGAN
KODE
JENIS PEKERJAAN
(a)
(b)
A
A-01
A-02
A-03
A-04
A-05
A-06
A-07
A-08
A-09
A-10
A-11
A-12
A-13
A-14
A-15
A-16
Dihitung
Dihitung
Dihitung
Dihitung
Dihitung
B
B-01
B-02
B-03
B-04
B-05
B-06
B-07
B-08
B-09
B-10
B-11
B-12
B-13
B-14
B-15
B-16
Dihitung
C
C-01
C-02
C-04
C-05
C-06
HARGA SATUAN
PEKERJAAN
( Rp )
(c)
PEKERJAAN PERSIAPAN
1 m' PAGAR SEMENTARA DARI KAYU, tinggi=2 METER
1 m' PAGAR SEMENTARA /PENGAMAN PROYEK DARI SENG GELOMBANG, tinggi=2 METER
1 m' PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1,8 METER
1 m' PENGUKURAN DAN PEMASANGAN BOUWPLANK
1 m2 PEMBUATAN KANTOR SEMENTARA /DIREKSI DENGAN LANTAI PLESTERAN
1 m2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT
1 m2 PEMBUATAN RUMAH JAGA / KOSTRUKSI KAYU
1 m2 PEKERJAAN MEMBERSIHKAN LAPANGAN DAN PERATAAN
1 m2 PEMBUATAN BEDENG BURUH
1 m2 PEMBUATAN BAK ADUKAN, UKURAN (40 x 50 x 20) cm
1 m2 PEMBUATAN STEGGER DARI BAMBU, UKURAN (40 x 50 x 20) cm
1 m2 PEMBUATAN JALAN SEMENTARA
1 m3 BONGKARAN BETON BERTULANG
1 m3 BONGKARAN DINDING TEMBOK BATA MERAH
1 M' PASANG PAGAR KAWAT JARING GALVANIS, TINGGI 1M
1 M' PASANG PAGAR BETON PRACETAK (5X50X213)CM
1 m2 BONGKARAN PLESTERAN DINDING (A144 Kep.Gub)
1 m2 BONGKARAN GENTENG (A146 Kep.Gub)
1 m2 BONGKARAN RANGKA ATAP /RENG+KASO (A147)
1 m3 BONGKARAN KUDA-KUDA, GORDING /BALOK (A150)
1 m2 BONGKARAN PLAFOND (A162)
160,231.50
278,111.90
109,901.00
38,065.50
620,152.50
578,176.50
655,490.00
5,555.00
614,064.00
77,859.65
11,639.10
57,057.00
235,029.30
23,502.93
2,777.50
17,710.00
4,796.00
279,620.00
4,350.50
PEKERJAAN TANAH
1 m3 GALIAN TANAH BIASA SEDALAM 1 METER
1 m3 GALIAN TANAH BIASA SEDALAM 2 METER
1 m3 GALIAN TANAH BIASA SEDALAM 3 METER
1 m3 GALIAN TANAH KERAS SEDALAM 1 METER
1 m3 GALIAN TANAH CADAS SEDALAM 1 METER
1 m3 GALIAN TANAH LUMPUR SEDALAM 1 METER
1 m2 PEKERJAAN STRIPPING SETINGGI 1 METER
1 m3 PEMBUANGAN TANAH SEJAUH 150 METER
1 m3 URUGAN KEMBALI
1 m3 PEMADATAN TANAH
1 m3 URUGAN PASIR
1 m3 LAPISAN PUDEL CAMPURAN 1 KP : 3 PS : 7 TL
1 m3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TL
1 m3 PEMASANGAN LAPISAN IJUK
1 m3 URUGAN SIRTU
1 m2 PEMBUATAN JALAN SEMENTARA TEBAL 25 CM
1 m3 URUGAN TANAH
15,004.00
19,703.20
27,547.30
23,421.20
46,887.50
30,902.30
1,875.50
19,283.00
7,192.90
18,755.00
76,351.00
14,866.50
101,777.50
64,652.50
49,951.00
PEKERJAAN PONDASI
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 1 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 2 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 3 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 4 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 5 Ps
639,083.50
509,267.00
441,683.00
401,153.50
373,070.50
(a)
C-07
C-08
C-09
C-10
C-11
C-12
C-13
C-014
C-015
C-016
C-017
C-018
D
D-01
D-02
D-03
D-04
D-05
D-06
D-07
D-08
D-09
D-010
D-011
D-012
D-013
D-014
D-015
D-016
D-017
D-018
D-019
D-020
D-021
D-022
D-023
D-024
D-025
D-026
D-027
(b)
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 6 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 8 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Kp : 1 Sm : 1 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Kp : 1 Sm : 2 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 1/4 Kp : 4 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 3 Kp : 10 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1/4 Pc : 1 Kp : 4 Ps
1 m3 PASANGAN PONDASI BATU KOSONG
1 m3 PASANGAN PONDASI SIKLOP 40% BATU KALI
1 m3 PASANGAN PONDASI SUMURAN DIAMETER 100 cm
1 m3 PEMBUATAN TIANG PANCANG BETON BERTULANG ( 40x40 ) cm,
1 m3 PEMBUATAN TIANG PANCANG BETON BERTULANG ( 35x35 ) cm,
(c)
340,472.00
323,862.00
150,757.20
1,155,610.50
600,644.00
633,164.40
496,061.50
PEKERJAAN DINDING
1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 1 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 2 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 3 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 4 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 5 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 6 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC : 3 Kp : 10 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 1 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 2 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 3 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 4 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 6 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 8 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 3 Kp : 10 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Kp : 1 Sm : 1 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Kp : 1 Sm : 2 Ps
1 m2 PASANGAN DINDING HOKLLOWBLOCK /BATAKO (HB-20)
1 m2 PASANGAN DINDING HOKLLOWBLOCK /BATAKO (HB-15)
1 m2 PASANGAN DINDING HOKLLOWBLOCK /BATAKO (HB-10)
1 m2 PASANGAN DINDING CONBLOCK (CB-20)
1 m2 PASANGAN DINDING CONBLOCK (CB-15)
1 m2 PASANGAN DINDING CONBLOCK (CB-10)
1 m2 PASANGAN DINDING LATAI
1 m2 PASANGAN DINDING ROSTER /TERAWANG (12X11X24) cm
1 m2 PASANGAN BATA BERONGGA UKURAN (5X11X24)CM
1 m2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYU
170,561.49
148,802.50
137,635.85
130,527.65
126,242.60
70,920.85
65,874.71
62,837.50
60,918.44
84,333.70
77,343.75
133,330.23
99,076.12
107,503.33
172,033.40
42,293.90
(a)
E
(b)
PEKERJAAN PLESTERAN
F
F-01
F-02
F-03
F-04
F-05
F-06
F-07
F-08
F-09
F-10
F-11
F-12
F-13
F-14
(c)
30,093.36
25,526.16
23,423.84
22,078.10
21,290.06
20,669.44
19,867.54
36,790.49
33,161.15
30,968.19
29,393.32
38,800.30
36,850.55
34,592.14
32,951.82
47,766.95
43,086.45
40,261.54
36,960.77
30,978.20
28,765.11
6,923.40
1,570,478.05
1,227,620.02
20,190.06
15,165.26
14,718.55
PEKERJAAN KAYU
1 m3 PASANG KUSEN PINTU DAN JENDELA KAYU JATI
1 m3 PASANG KUSEN PINTU DAN JENDELA KAYU KAMPER
1 m3 PASANG KUSEN PINTU DAN JENDELA KAYU BORNEO
1 m3 PASANG KUSEN PINTU DAN JENDELA KAYU DAMAR LAUT
1 m2 PASANG PINTU KLAMP KAYU KAMPER
1 m2 PASANG PINTU KLAMP KAYU BORNEO
1 m2 PASANG PINTU PANEL KAYU JATI
1 m2 PASANG PINTU PANEL KAYU KAMPER
1 m2 PASANG PINTU DAN JENDELA KACA KAYU JATI (TANPA KACA)
1 m2 PASANG PINTU DAN JENDELA KACA KAYU KAMPER (TANPA KACA)
1 m2 PASANG PINTU DAN JENDELA KACA KAYU BORNEO (TANPA KACA)
1 m2 PASANG PINTU DAN JENDELA JALUSI KAYU JATI
1 m2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER
1 m2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI
11,476,630.00
8,685,930.00
6,798,330.00
6,798,330.00
292,729.80
236,101.80
534,985.00
413,985.00
455,939.00
350,064.00
295,009.00
795,278.00
610,698.00
364,443.20
(a)
(b)
(c)
305,153.20
679,772.50
498,272.50
274,322.40
367,116.20
307,826.20
445,227.20
385,937.20
418,827.20
359,537.20
501,030.20
441,740.20
7,877,980.00
6,147,680.00
7,877,980.00
85,596.50
66,720.50
98,180.50
76,158.50
1,050,489.00
790,944.00
97,531.50
78,655.50
168,498.00
132,319.00
59,486.90
84,742.90
112,865.50
65,342.20
52,758.20
198,929.50
157,245.00
311,129.50
269,159.00
26,310.13
11,040.70
3,134,780.00
33,852.50
45,787.50
3,405,930.00
24,783.00
(a)
G
G-01
G-02
G-03
G-04
G-05
G-19
G-20
G-21
G-22
G-23
G-24
G-25
G-26
G-27
G-28
G-29
G-30
G-31
G-32
G-33
G-34
G-35
G-36
G-37
G-38
G-39
G-40
G-41
G-42
G-43
G-44
G-45
G-46
H
H-01
H-02
H-03
H-04
H-05
H-06
H-07
H-08
H-09
H-10
H-11
H-12
H-13
H-14
H-15
H-16
H-17
H-18
H-19
(b)
(c)
PEKERJAAN BETON
1 m3 MEMBUAT BETON TUMBUK, 1 PC : 3 Ps : 5 Kr
1 m3 MEMBUAT BETON TUMBUK, 1 PC : 3 Ps : 6 Kr
1 m3 MEMBUAT BETON TUMBUK, 1 PC : 4 Ps : 6 Kr
1 m2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 PC : 3 Ps : 5 Kr
1 m3 MEMBUAT BETON TUMBUK, 1 PC : 2 Ps : 3 Kr
1 m' MEMASANG PVC WATERSTOP LEBAR 150 mm
1 m' MEMASANG PVC WATERSTOP LEBAR 200 mm
1 m' MEMASANG PVC WATERSTOP LEBAR 230 mm
1 m' MEMASANG PVC WATERSTOP LEBAR 250 mm
1 m' MEMASANG PVC WATERSTOP LEBAR 300 mm
1 m' MEMASANG PVC WATERSTOP LEBAR 320 mm
1 Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR
1 Kg KABEL PRESSTRESSED POLOS /STRANDS
1 Kg JARING KAWAT BAJA
1 m2 PASANG BEKISTING UNTUK PONDASI
1 m2 PASANG BEKISTING UNTUK SLOOF
1 m2 PASANG BEKISTING UNTUK KOLOM
1 m2 PASANG BEKISTING UNTUK BALOK
1 m2 PASANG BEKISTING UNTUK LANTAI
1 m2 PASANG BEKISTING UNTUK DINDING
1 m2 PASANG BEKISTING UNTUK TANGGA
1 m3 MEMBUAT BETON DENGAN MUTU K-225
1 m3 MEMBUAT BETON DENGAN MUTU K 275
1 m2 PASANG JEMBATAN COR
1 m3 MEMBUAT PONDASI BETON BERTULANG (150 Kg Besi + Bekisting)
1 m3 MEMBUAT SLOOF BETON BERTULANG (200 Kg Besi + Bekisting)
1 m3 MEMBUAT KOLOM BETON BERTULANG ( 300 Kg Besi + Bekisting )
1 m3 MEMBUAT BALOK BETON BERTULANG ( 200 Kg Besi + Bekisting )
1 m3 MEMBUAT BALOK BETON BERTULANG ( 150 Kg Besi + Bekisting )
1 m3 MEMBUAT DINDING BETON BERTULANG ( 150 Kg Besi + Bekisting )
1 m3 MEMBUAT TANGGA BETON BERTULANG ( 200 Kg Besi + Bekisting )
1 m' MEMBUAT KOLOM PENGUAT BETON BERTULANG ( 11x11 ) cm
1 m' MEMBUAT RING BALOK BETON BERTULANG ( 10x15 ) cm
507,919.50
486,876.50
463,809.50
60,115.00
511,406.50
10,013.30
9,787.58
20,849.40
88,007.70
95,707.70
121,959.20
127,239.20
184,219.20
145,719.20
122,569.70
876,854.00
879,450.00
21,254.20
2,164,866.00
2,694,446.70
5,206,690.50
4,011,417.30
3,690,643.00
3,741,647.80
3,743,835.70
43,604.00
55,032.45
29,770.40
50,395.40
18,260.00
46,356.20
46,356.20
44,046.20
31,289.50
65,003.40
76,003.40
16,281.10
92,181.10
17,381.10
18,921.10
19,222.50
20,762.50
27,142.50
(a)
H-20
H-21
H-22
H-25
H-28
H-30
H-32
H-33
H-34
H-36
H-37
H-38
H-39
H-40
(b)
1 m2 PASANG ATAP ASBES GELOMBANG ( 2,10x1,80 m ) x 6 mm
1 m2 PASANG ATAP ASBES GELOMBANG ( 1,80x1,80 m ) x 6 mm
1 m' PASANG BUBUNG STEL GELOMBANG 0.92 m
1 m' PASANG NOK PATEN 0.92 m
1 m' PASANG NOK STEL RATA 0.92 m
1 m2 PASANG ATAP GENTENG BETON
1 m2 PASANG ATAP GENTENG METAL
1 m2 PASANG ATAP SIRAP
1 m' PASANG NOK GENTENG BETON
1 m' PASANG NOK GENTENG METAL
1 m' PASANG NOK SIRAP
1 m2 PASANG ATAP SENG GELOMBANG
1 m2 PASANG ATAP NOK SENG
1 m2 PASANG ATAP ALUMINIUM
(c)
55,990.00
PEKERJAAN LANGIT-LANGIT
14,394.05
27,646.85
49,921.85
261,250.00
18,945.30
79,830.30
159,569.85
6,066.50
51,146.70
104,592.95
(a)
J
(b)
PEKERJAAN SANITASI
K
K-01
K-02
K-03
K-05
K-06
K-07
K-08
K-09
K-12
K-18
K-19
K-20
Dihitung
(c)
1,361,395.20
263,054.00
714,043.00
457,506.50
339,944.00
556,226.00
26,153.30
31,041.26
12,763.78
237,179.31
9,542.69
L-01
L-02
172,315.33
587,611.20
96,987.28
86,664.88
76,088.38
21,038.68
59,007.30
109,917.50
(a)
L-03
L-04
L-05
L-06
L-07
L-09
L-11
L-12
L-14
L-15
L-16
L-17
L-18
L-20
L-23
L-24
(b)
1 BUAH PASANG KUNCI TANAM KAMAR MANDI
1 BUAH PASANG KUNCI SILINDER
1 BUAH PASANG ENGSEL PINTU
1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU
1 BUAH PASANG ENGSEL ANGIN
1 BUAH PASANG KAIT ANGIN
1 BUAH PASANG KUNCI SELOT
1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER
1 BUAH PASANG REL PINTU DORONG
1 BUAH PASANG KUNCI LEMARI
1 m2 PASANG KACA TEBAL 3 mm
1 m2 BUAH PASANG KACA TEBAL 5 mm
1 m2 BUAH PASANG KACA TEBAL 8 mm
1 m2 BUAH PASANG KACA CERMIN TEBAL 3 mm
1 m2 BUAH PASANG KACA WIREGLASS TEBAL 5 mm
1 m2 BUAH PASANG KACA PATRI TEBAL 5 mm
(c)
109,408.75
49,907.28
21,901.83
13,354.55
19,195.00
8,151.83
14,719.10
66,772.75
364,807.30
23,486.38
53,526.83
65,626.83
(a)
M
(b)
PEKERJAAN PENUTUP LANTAI DAN DINDING
N
N-01
N-02
N-03
N-04
N-06
N-07
N-08
N-09
N-11
N-12
N-13
N-14
N-15
N-19
N-20
N-21
N-22
N-23
(c)
50,101.70
94,049.37
106,685.04
109,985.04
100,085.04
112,165.90
105,857.40
105,857.40
99,755.04
106,289.04
113,432.88
117,091.92
106,685.04
112,185.04
68,940.30
72,273.30
83,383.30
80,050.30
PEKERJAAN PENGECATAN
1 m2 MENGIKIS / MENGEROK PERMUKAAN CAT TEMBOK LAMA
1 m2 MENCUCI BIDANG PERMUKAAN TEMBOK YANG PERNAH DI CAT
1 m2 MENGEROK KARAT CAT LAMA PERMUKAAN BAJA DENGAN CARA MANUAL
1 m2 MENYABUN PERMUKAAN TEMBOK LAMA
1 m2 MENDEMPUL DAN MENGGOSOK KAYU
1 m2 PENGECATAN BIDANG KAYU LAMA
1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 3 Lapis Cat Penutup)
1 m2 PELABURAN BIDANG KAYU DENGAN POLITUR
1 m2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER
1 m2 PELABURAN BIDANG KAYU DENGAN VERNIS
1 m2 PENGECATAN BIDANG TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
1 m2 PENGECATAN BIDANG TEMBOK LAMA ( 1 Lapis Cat dasar; 2 Lapis Cat Penutup )
1 m2 PEMASANGAN WALL PAPER
1 m2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
1 m2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH
1 m2 PENGECATAN PERMUKAAN BAJA LAPIS SENG GALBANI SECARA MANUAL (4 lapis cat konvensional, tebal 200 um)
1 m2 PENGECATAN PERMUKAAN BAJA LAPIS GALBANI SECARA MANUAL (1 lapis cat mutakhir, tebal 200 um)
PEKERJAAN JALAN
5,062.75
5,145.25
5,145.25
5,145.25
4,384.05
20,768.00
25,546.40
32,667.80
29,522.35
3,994.10
15,778.95
9,595.96
6,830.89
11,924.00
23,573.00
(a)
K.511
K.513
K.516
K.520
K.521
K.618
K.641
AN. 18
AN. 20
AN. 15
Dihitung
Dihitung
(b)
1 M3 LAPIS PONDASI BAWAH KLAS A AGREGAT PECAH TERSARING ( MENGGUNAKAN BURUH )
1 M3 LAPIS PONDASI BAWAH KLAS B ( MENGGUNAKAN BURUH )
1 M2 LAPIS PONDASI BAWAH ( LPB ) KONSTRUKSI TELFORD
1 M3 LAPIS PONDASI ATAS KLAS A AGREGAT PECAH TERSARING ( MENGGUNAKAN ALAT )
1 M3 LAPIS PONDASI ATAS KLAS A AGREGAT PECAH TERSARING ( MENGGUNAKAN BURUH )
1 M2 LAPIS PENETRASI / PERMUKAAN MACADAM 50 MM LAPEN ( MENGGUNAKAN BURUH )
1 m2 PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON (LASTON)
1 M2 LAPIS PEREKAT
1 M2 PENGHAMPARAN DAN PEMADATAN ATB
1 M2 SUB BASE BATU BELAH
1 m2 PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON (LASTON) t = 4 cm
1 m2 PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON (LASTON) t = 3,5 cm
(c)
155,327.33
143,960.67
32,921.63
145,661.27
177,961.67
60,111.95
97,816.02
9,111.48
88,880.82
40,022.81
78,252.81
68,471.21
0
0
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
1
2
3
4
5
6
7
8
SATUAN
HARGA
(Rp)
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
Zak
Zak
Kg
m3
m3
Pengecoran/ Hari
< 20 m3/M3
<100 m3
Penambahan lebih dari
100 M3
Kg
110,000
43,000
87,000
65,000
109,000
65,000
142,000
81,000
109,000
129,000
153,000
142,000
131,000
103,000
92,000
93,000
900
3,000
2,400
2,400
1,600
500
2,700
2,700
3,300
4,800
62,000
69,000
69,000
62,000
55,000
38,000
69,000
41,000
66,000
48,000
69,000
52,000
28,000
13,000
22,000
65,000
100,000
9,000
765,000
695,000
218,000
146,000
2,195,000
Kg
ton
ton
ton
ton
ton
liter
m3
12,000
1,147,000
1,162,000
1,222,000
1,155,000
20,000
-
2,850
100,000
1
2
3
4
5
5
6
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Kg
Kg
Kg
m2
m2
m2
Kg
m2
m2
Bh
Kg
m'
m2
m2
Kg
Kg
Kg
Kg
Kg
rool
rool
lbr
bh
Kg
Kg
Bh
Bh
Bh
m2
18,000
18,000
20,000
326,000
239,000
22,000
88,000
101,000
11,000
22,000
55,000
27,000
13,000
28,000
31,000
27,000
57,000
49,000
1,499,000
2,272,000
71,000
8,900
34,400
12,600
402,000
471,000
681,000
300,000
1
2
3
4
5
6
7
8
9
10
11
12
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
ikat
19,000
23,000
28,000
34,000
41,000
54,000
69,000
108,000
84,000
96,000
145,000
8,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
E. BAHAN PERPIPAAN
Besi Pipa untuk Hydrant BSP 1"
Besi Pipa untuk Hydrant BSP 1,25"
Besi Pipa untuk Hydrant BSP 1,5"
Besi Pipa untuk Hydrant BSP 2"
Pipa Galvanis 1/2" (Ligth)
Pipa Galvanis 3/4" (Ligth)
Pipa Galvanis 1" (Ligth)
Pipa Galvanis 1 1/4" (Ligth)
Pipa Galvanis 1 1/2" (Ligth)
Pipa Galvanis 2" (Ligth)
Pipa Galvanis 2 1/2" (Ligth)
Pipa Galvanis 3" (Ligth)
Pipa Galvanis 4" (Ligth)
Pipa 1-1/4" Black Steel /SII MED A
Pipa 2" Black Steel /SII MED A
Pipa 3" Black Steel /SII MED A
Pipa 6" Black Steel /SII MED A
Talang 4 M'
Gantungan Plat
Gantungan Plastik
Pipa PVC Diameter 1/2 " (Tipe AW Setara Maspion)
Pipa PVC Diameter 3/4 " (Tipe AW Setara Maspion)
Pipa PVC Diameter 1 " (Tipe AW Setara Maspion)
Pipa PVC Diameter 1 1/2 " (Tipe AW Setara Maspion)
Pipa PVC Diameter 2 " (Tipe AW Setara Maspion)
Pipa PVC Diameter 1/2 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 3/4 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 1 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 1 1/4 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 1 1/2 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 2 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 2 1/2 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 3 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 4 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 5 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 6 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 8 " (Tipe AW Setara Wavin)
Pipa PVC Diameter 20 mm/ 1/2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 25 mm/ 3/4 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 32 mm/ 1 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 40 mm/ 1 1/4 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
btg
bh
bh
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
22,000
24,000
30,000
31,000
15,000
19,000
25,000
32,000
37,000
52,000
80,000
93,000
121,000
72,000
113,000
194,000
435,000
6,000
1,000
600
2,400
3,400
4,000
6,000
8,000
5,000
7,000
10,000
15,000
17,000
22,000
32,000
44,000
73,000
121,000
170,000
291,000
3,900
5,800
9,900
14,500
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
Pipa PVC Diameter 50 mm/ 1 1/2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 m S.10 Plain End/Ts. End )
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 m S.10 Bell End )
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 200 mm/ 8 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 225 mm/ 8 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 250 mm/ 10 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 315 mm/ 12 " ( Setara Pralon P.6 S.12,5 Plain End/Ts. End)
Pipa PVC Diameter 63 mm/ 2 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 75 mm/ 2 1/2 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 90 mm/ 3 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 110 mm/ 4 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 140 mm/ 5 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 160 mm/ 6 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 200 mm/ 8 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 225 mm/ 8 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 250 mm/ 10 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 315 mm/ 12 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 355 mm/ 14 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 400 mm/ 16 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 500 mm/ 20 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa PVC Diameter 630 mm/ 24 " ( Setara Pralon P.6 m S.12,5 Bell End )
Pipa HDPE PE Diameter 20 mm/ 1/2 "(Setara Vinilon PE100 S5 - SDR 11 PN 16)
Pipa HDPE PE Diameter 25 mm/ 3/4 "(Setara Vinilon PE 100 S5 - SDR 11 PN 16)
Pipa HDPE PE Diameter 32 mm/ 1 "(Setara Vinilon PE 100 S5 - SDR 11 PN 16)
Pipa HDPE PE Diameter 50 mm/ 1 1/2 "(Setara Vinilon PE 100 S5 - SDR 11 PN 16)
Pipa HDPE PE Diameter 63 mm/ 2 "(Setara Vinilon PE 100 S5 - SDR 11 PN 16)
Pipa HDPE PE Diameter 75 mm/ 2 1/2 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 90 mm/ 3 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 110 mm/ 4 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 125 mm/ 5 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 160 mm/ 6 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 180 mm/ 7 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 200 mm/ 8 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 225 mm/ 9 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 250 mm/ 10 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 315 mm/ 12 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 355 mm/ 14 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 400 mm/ 16 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 450 mm/ 18 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 500 mm/ 20 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 630 mm/ 24 "(Setara Vinilon PE100 S5-SDR 11 PN 16)
Pipa HDPE PE Diameter 50 mm/ 1 1/2"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 63 mm/ 2"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 75 mm/ 2 1/2"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 90 mm/ 3"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 110 mm/ 4"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 125 mm/ 5"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 160 mm/ 6"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 180 mm/ 7"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 200 mm/ 8"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 225 mm/ 9"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 250 mm/ 10"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 315 mm/ 12"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 355 mm/ 14"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 400 mm/ 15"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 450 mm/ 18"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 500 mm/ 20"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 630 mm/ 24"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 710 mm/ 28"(Setara Vinilon PE100 S6.3-SDR 13.6 PN 12.5)
Pipa HDPE PE Diameter 50 mm/ 1 1/2"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 63 mm/ 2"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 75 mm/ 2 1/2"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 90 mm/ 3"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 110 mm/ 4"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 125 mm/ 5"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 160 mm/ 6"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 180 mm/ 7"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 200 mm/ 8"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 225 mm/ 9"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 250 mm/ 10"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 315 mm/ 12"(Setara Vinilon PE100 S8-SDR 17 PN 10)
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
22,000
35,000
50,000
72,000
109,000
174,000
230,000
36,000
52,000
75,000
112,000
181,000
236,000
29,000
41,000
59,000
87,000
143,000
188,000
291,000
365,000
455,000
726,000
30,000
42,000
62,000
91,000
150,000
194,000
301,000
380,000
472,000
763,000
969,000
1,241,000
1,998,000
3,180,000
5,800
7,700
20,000
31,000
49,000
68,000
99,000
148,000
192,000
314,000
397,000
490,000
620,000
762,000
1,211,000
1,537,000
1,951,000
2,671,000
3,297,000
5,233,000
25,000
40,000
56,000
81,000
122,000
158,000
259,000
329,000
403,000
512,000
631,000
1,002,000
1,271,000
1,613,000
2,208,000
2,725,000
4,321,000
6,964,000
20,000
33,000
47,000
68,000
101,000
129,000
212,000
268,000
331,000
421,000
516,000
821,000
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
Pipa HDPE PE Diameter 355 mm/ 14"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 400 mm/ 16"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 450 mm/ 18"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 500 mm/ 20"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 630 mm/ 24"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 710 mm/ 28"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 800 mm/ 32]"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 900 mm/ 35"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 1000 mm/ 40"(Setara Vinilon PE100 S8-SDR 17 PN 10)
Pipa HDPE PE Diameter 50 mm/ 1 1/2"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 63 mm/ 2"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 75 mm/ 2 1/2"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 90 mm/ 3"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 110 mm/ 4"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 125 mm/ 5"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 160 mm/ 6"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 180 mm/ 7"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 200 mm/ 8"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 225 mm/ 9"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 250 mm/ 10"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 315 mm/ 12"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 355 mm/ 14"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 400 mm/ 15"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 450 mm/ 18"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 500 mm/ 20"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 630 mm/ 24"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 710 mm/ 28"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 800 mm/ 32"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 900 mm/ 35"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 1000 mm/ 40"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Pipa HDPE PE Diameter 1200 mm/ 48"(Setara Vinilon PE100 S10-SDR 21 PN 8)
Straight Coupling Compresion OD 40 mm
Straight Coupling Compresion OD 50 mm
Straight Coupling Compresion OD 63 mm
Straight Coupling Compresion OD 75 mm
Straight Coupling Compresion OD 90 mm
Straight Coupling Compresion OD 110 mm
Clamp Saddle OD 63 x 1"
Clamp Saddle OD 63 x 1 1/4"
Clamp Saddle OD 75 x 1"
Clamp Saddle OD 90 x 1"
Clamp Saddle OD 90 x 1 1/4"
Clamp Saddle OD 90 x 2"
Clamp Saddle OD 110 x 1"
Clamp Saddle OD 110 x 1 1/4"
Clamp Saddle OD 110 x 2"
Clamp Saddle OD 160 x 1"
Clamp Saddle OD 160 x 1 1/4"
Ferrrule Threaded with knife dia 1 1/4" x 3/4"
Ferrrule Compression Join with knife dia 1 1/4" x 25mm
Male Thread adaptor OD 40 x 1 1/4"
Male Thread adaptor OD 50 x 1 1/2"
Male Thread adaptor OD 63 x 2"
Male Thread adaptor OD 75 x 2 1/2"
Male Thread adaptor OD 90 x 3"
Male Thread adaptor OD 110 x 4"
Male Elbow 90 OD 40 x 1 1/4"
Male Elbow 90 OD 50 x 1 1/2"
Male Elbow 90 OD 63 x 2"
Male Elbow 90 OD 75 x 2 1/2"
Male Elbow 90 OD 90 x 3"
Male Elbow 90 OD 110 x 4"
Elbow 90 OD 25 mm
Elbow 90 OD 40 mm
Elbow 90 OD 50 mm
Elbow 90 OD 63 mm
Elbow 90 OD 75 mm
Elbow 90 OD 90 mm
Elbow 90 OD 110 mm
Female Theaded Adaptor OD 110 x 4 "
Female Theaded Elbow OD 110 x 4 "
End Cap OD 40 mm
End Cap OD 50 mm
End Cap OD 63 mm
End Cap OD 75 mm
End Cap OD 90 mm
End Cap OD 110 mm
Equal Tee OD 40 mm
Equal Tee OD 50 mm
Equal Tee OD 63 mm
Equal Tee OD 75 mm
Equal Tee OD 90 mm
Equal Tee OD 110 mm
Reducing Coupler OD 63 x 32 mm
Reducing Coupler OD 63 x 40 mm
Reducing Coupler OD 63 x 50 mm
Reducing Coupler OD 75 x 50 mm
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
1,045,000
1,320,000
1,809,000
2,229,000
3,539,000
4,437,000
5,708,000
7,189,000
8,924,000
17,000
27,000
38,000
55,000
83,000
106,000
174,000
219,000
272,000
343,000
420,000
667,000
847,000
1,080,000
1,477,000
1,822,000
2,881,000
3,617,000
4,650,000
5,835,000
7,270,000
10,461,000
55,000
62,000
94,000
120,000
269,000
751,000
28,000
38,000
46,000
52,000
74,000
79,000
96,000
96,000
96,000
132,000
157,000
138,000
138,000
21,000
30,000
42,000
66,000
135,000
369,000
31,000
35,000
58,000
86,000
201,000
492,000
11,000
49,000
58,000
92,000
126,000
286,000
764,000
388,000
798,000
23,000
27,000
38,000
59,000
121,000
368,000
78,000
81,000
124,000
176,000
374,000
791,000
52,000
66,000
66,000
80,000
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
Reducing Coupler OD 75 x 63 mm
Reducing Coupler OD 90 x 63 mm
Reducing Coupler OD 110 x 63 mm
Reducing Coupler OD 110 x 75 mm
Reducing Coupler OD 110 x 90 mm
Reducing Tee OD 110 x 63 mm
Reducing Tee OD 110 x 75 mm
Reducing Tee OD 110 x 90 mm
Ts. Faucet Socket (Inj) 1/2" x 1/2"
Ts. Faucet Socket (Inj) 3/4" x 3/4"
Ts. Faucet Socket (Inj) 1" x 1"
Ts. Faucet Socket (Inj) 1 1/4" x 1 1/4"
Ts. Faucet Socket (Inj) 1 1/2" x 1 1/2"
Ts. Faucet Socket (Inj) 2" x 2"
Ts. Faucet Socket (Inj) 3" x 3"
Ts. Faucet Socket (Inj) 4" x 4"
Ts. Faucet Tee (Inj) 1/2" x 1/2"
Ts. Faucet Tee (Inj) 3/4" x 3/4"
Ts. Faucet Knee (Inj) 1/2" x 1/2"
Ts. Faucet Knee (Inj) 3/4" x 3/4"
Ts. Valve Socket (Inj) 1/2"
Ts. Valve Socket (Inj) 3/4"
Ts. Valve Socket (Inj) 1"
Ts. Valve Socket (Inj) 1 1/4"
Ts. Valve Socket (Inj) 1 1/2"
Ts. Valve Socket (Inj) 2"
Ts. Valve Socket (Inj) 3"
Ts. Valve Socket (Inj) 4"
Ts. Cap (Inj) 1/2"
Ts.Cap (Inj) 3/4"
Ts. Cap (Inj) 1"
Ts. Cap (Inj) 1 1/4"
Ts. Cap (Inj) 1 1/2"
Ts. Cap (Inj- Solvent Cement) 2"
Ts. Cap (Inj- Solvent Cement) 3"
Ts. Cap (Inj- Solvent Cement) 4"
Ts. Cap (Inj- Solvent Cement) 6"
Ts. Cap (Inj- Rubber Ring) 2"
Ts. Cap (Inj- Rubber Ring) 3"
Ts. Cap (Inj- Rubber Ring) 4"
Ts. Cap (Inj- Rubber Ring) 6"
Dresser Joint (C.l + PVC Body ) 2"
Dresser Joint (C.l + PVC Body ) 3"
Dresser Joint (C.l + PVC Body ) 4"
Dresser Joint (C.l + PVC Body ) 6"
Dresser Joint (C.l + PVC Body ) 8"
Dresser Joint (C.l + PVC Body ) 10"
Dresser Joint (C.l + PVC Body ) 12"
Dresser Joint (C.l + PVC Body ) 14"
Dresser Joint (C.l + PVC Body ) 16"
Ts. Socket - W (Heat Process) 1/2"
Ts. Socket - W (Heat Process) 3/4"
Ts. Socket - W (Heat Process) 1"
Ts. Socket - W (Heat Process) 1 1/4"
Ts. Socket - W (Heat Process) 1 1/2"
Ts. Socket - W (Heat Process) 2"
Ts. Socket - W (Heat Process) 2 1/2"
Ts. Socket - W (Heat Process) 3"
Ts. Socket - W (Heat Process) 4"
Vc. Socket - W (Heat Process) 3" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 4" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 5" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 6" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 8" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 10" (10 Kg/cm2)
Vc. Socket - W (Heat Process) 12" (10 Kg/cm2)
Bell Va Socket (Heat Process) 2" (10 Kg/cm2)
Bell Va Socket (Heat Process) 3" (10 Kg/cm2)
Bell Va Socket (Heat Process) 4" (10 Kg/cm2)
Bell Va Socket (Heat Process) 5" (10 Kg/cm2)
Bell Va Socket (Heat Process) 6" (10 Kg/cm2)
Bell Va Socket (Heat Process) 8" (10 Kg/cm2)
Bell Va Socket (Heat Process) 10" (10 Kg/cm2)
Bell Va Socket (Heat Process) 12" (10 Kg/cm2)
Spigot Bell End (Heat Process) 2" x 11 (10 Kg/cm2)
Spigot Bell End (Heat Process) 2" x 22 (10 Kg/cm2)
Spigot Bell End (Heat Process) 2" x 45 (10 Kg/cm2)
Spigot Bell End (Heat Process) 2" x 90 (10 Kg/cm2)
Spigot Bell End (Heat Process) 3" x 11 (10 Kg/cm2)
Spigot Bell End (Heat Process) 3" x 22 (10 Kg/cm2)
Spigot Bell End (Heat Process) 3" x 45 (10 Kg/cm2)
Spigot Bell End (Heat Process) 3" x 90 (10 Kg/cm2)
Spigot Bell End (Heat Process) 4" x 11 (10 Kg/cm2)
Spigot Bell End (Heat Process) 4" x 22 (10 Kg/cm2)
Spigot Bell End (Heat Process) 4" x 45 (10 Kg/cm2)
Spigot Bell End (Heat Process) 4" x 90 (10 Kg/cm2)
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
89,000
207,000
658,000
663,000
479,000
909,000
909,000
909,000
11,000
14,000
23,000
26,000
35,000
50,000
151,000
224,000
1,600
2,000
1,600
2,600
5,600
6,100
6,100
9,700
17,000
28,000
91,500
177,100
1,900
2,800
3,700
5,700
8,800
19,000
31,000
38,000
80,000
34,000
62,000
121,000
184,000
156,000
248,000
495,000
923,000
1,508,000
2,815,000
3,377,000
3,613,000
4,541,000
1,000
1,000
3,000
5,000
7,000
10,000
14,000
24,000
48,000
24,000
48,000
78,000
146,000
329,000
597,000
848,000
41,000
67,000
108,000
173,000
244,000
439,000
770,000
1,263,000
29,000
34,000
35,000
44,000
61,000
69,000
79,000
95,000
95,000
107,000
133,000
180,000
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
1
2
3
4
5
6
7
8
9
10
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
266,000
312,000
371,000
431,000
463,000
531,000
629,000
909,000
814,000
913,000
1,156,000
1,639,000
2,200
4,600
8,400
15,700
16,900
31,600
58,600
72,000
168,700
325,600
389,100
1,700
2,700
2,700
5,000
6,700
7,000
7,400
9,900
8,900
9,400
12,000
16,000
17,000
18,000
44,000
44,000
49,000
44,000
47,000
123,000
213,000
220,000
196,000
269,000
269,000
582,000
815,000
815,000
887,000
1,900
3,000
3,600
5,600
5,700
4,100
6,000
7,700
9,000
10,000
18,000
49,000
49,000
55,000
65,000
120,000
71,000
100,000
101,000
194,000
186,000
311,000
303,000
m
m
Bh
kg
Bh
Bh
Bh
Bh
Bh
m'
194,000
266,000
27,000
19,000
48,000
45,000
4,629,000
54,000
65,000
33,000
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
1
2
3
4
5
m'
kg
Bh
kg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
83,000
11,000
609,000
36,000
139,000
139,000
292,000
598,000
737,000
139,000
918,000
904,000
904,000
180,000
197,000
139,000
1,263,000
1,482,000
2,079,000
1,263,000
1,943,000
2,194,000
3,630,000
7,260,000
9,438,000
11,132,000
12,487,000
13,057,000
14,328,000
46,827,000
53,512,000
69,958,000
77,583,000
36,498,000
24,684,000
btg
btg
btg
btg
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
btg
m3
m3
m3
m3
m3
m3
m3
m'
m3
btg
m'
m'
m'
m'
m'
m'
m'
btg
lbr
bh
peti
lbr
lbr
6,000
9,000
21,000
27,000
81,000
4,830,000
4,830,000
8,970,000
7,590,000
8,970,000
9,315,000
10,350,000
1,932,000
4,140,000
5,175,000
8,280,000
16,560,000
16,560,000
9,315,000
4,140,000
7,590,000
8,280,000
2,392,000
2,691,000
15,600
10,400
1,800,000
4,743,000
10,350,000
7,935,000
10,350,000
9,660,000
10,350,000
6,210,000
7,935,000
10,000
3,700
6,300
6,300
9,800
17,000
157,000
43,000
56,000
3,600
36,000
72,000
54,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
1
2
2
3
4
5
7
1
2
3
4
5
6
7
8
9
10
11
12
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
m2
m2
m2
Lbr
86,000
82,000
79,000
93,000
139,000
173,000
226,000
58,000
127,000
192,000
93,000
161,000
135,000
111,000
447,000
58,000
11,000
7,900
13,000
111,000
Lbr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
/5 Ltr
Kg
KG
KG
Gall
Kg
Gall
Gall
KG
KG
KG
KG
Kg
Kg
Bh
Bh
bh
bh
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Kg
Kg
1,700
36,000
36,000
54,000
36,000
36,000
42,000
15,000
18,000
36,000
117,000
84,000
78,000
15,000
72,000
90,000
169,000
114,000
199,000
127,000
31,000
15,000
6,000
6,000
9,000
12,100
4,200
16,000
34,000
34,000
14,000
24,000
12,000
14,000
72,000
14,000
2,900
8,400
19,300
100,000
16,600
K. BAHAN KACA
Glass Block 20 x 20 ex DN
Glass Block 20 x 20 ex LN
Kaca Polos 2 mm
Kaca Polos 3 mm
Kaca Polos 5 mm
Kaca Ryben 5 mm
Kaca Ryben 12 mm
bh
bh
m2
m2
m2
m2
m2
21,000
30,000
48,000
60,000
72,000
-
bh
Kg
Kg
Kg
bh
bh
bh
Kg
bh
Kg
Bh
bh
24,900
14,500
30,200
5,700
5,700
6,800
11,000
18,000
500
60,500
300
5,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
M. BAHAN SANITER
Bak fibreglass
Closet Duduk Keramik LN ( lengkap )
Closet Duduk Warna Standar INA ( lengkap )
Closet Jongkok Porselin Putih ( standar )
Closet Jongkok Porselin Warna
Floor Drain /Saringan KM stenless steel
Kran Bebek 1/2 "
Kitchen Zink Stailess Lengkap Sipon & Sparing
Kitchen Zink Stailess Standar lokal ( 1 Lobang )
Kitchen Zink Stailess Non Standar franke ( 1 Lobang )
Kitchen Zink Stailess Non Standar franke ( 2 Lobang )
Kran Panas-Dingin ( standar )
Kran Tembok 1/2 "
Kran Tembok 3/4 "
Penyekat Urinoir
Seal tape
Shower ( dengan tiang )
Shower ( tanpa tiang )
Stop kran 1 " setara KIT
Stop kran 1 " setara KIT
Tempat Sabun Porselin
Urinoir Warna Standar ( lengkap )
Wastafel Bulat Warna Standar ( lengkap )
Wastafel setara merk INA ( lengkap )
Wastafel setara merk TOTO LW 230 ( lengkap )
Water Thurn 500 liter (standar)
Water Thurn 1000 liter (standar)
Tangki Fiber Glass 3m3
Tangki Fiber Glass 10m3 #
Tangki 3m3 PE #
Tangki 6m3 PE #
Bh
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Lbr
Set
bh
bh
bh
bh
bh
bh
Unit
bh
bh
Bh
Bh
Bh
Bh
Bh
Bh
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
bh
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
m2
m2
Lbr
Lbr
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
284,000
1,141,000
1,492,000
157,000
175,000
90,000
84,000
193,000
210,000
217,000
363,000
262,000
15,000
18,000
280,000
1,700
108,000
72,000
17,000
69,000
165,000
631,000
527,000
351,000
702,000
1,573,000
3,146,000
8,470,000
48,702,000
4,591,900
7,514,100
6,100
65,300
139,100
26,200
47,300
50,000
29,100
126,500
37,500
20,700
70,800
24,900
25,600
22,300
26,800
18,100
2,200
6,400
2,600
2,200
14,500
261,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Ls
bh
bh
Ls
Ls
Ls
Ls
m2
Unit
Kg
Set
bh
bh
Unit
Unit
Unit
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
29,100
50,000
29,500
4,444,000
1,718,000
1,913,000
3,557,000
588,000
83,400
91,700
302,500
365,800
29,000
2,666,000
2,400
841,700
333,100
333,100
4,800
8,400
41,900
32,600
67,200
50,300
722,000
165,400
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Lampu TL 1 x 20 Watt
Lampu TL 1 x 40 Watt
Lampu TL 2 x 20 Watt
Lampu TL RM 2 x 20 Watt
Lampu TL RM 4 x 20 Watt
MLL 160 Watt
Panel LP-A
Panel LP-B
Panel LP-C
Panel LP-D
Panel LP-E
Panel SDP
Pasang telepon
Saklar Ganda Broco
Saklar tunggal Broco
Stop kontak Broco
Tiang Listrik
Titik Cahaya
Trafo 80 Watt / 220
Box Street
Genset STC 20 Kw Mesin Hopper Starter Setara Produk Cina
Genset STC 7,5 KW - Mesin 15,5 3 phase Hopper Starter, Setara Yanmar #
Kabel NYY 3x6,5mm
Kabel NYY 3x10mm
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Ls
bh
bh
bh
bh
Ttk
bh
bh
bh
bh
m
m
11,400
14,500
6,000
388,000
666,300
176,600
353,400
530,000
336,700
336,700
336,700
184,900
2,103,000
15,700
11,400
12,100
6,734,000
110,500
546,700
145,900
22,194,000
32,700,000
38,100
61,100
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
bh
bh
bh
bh
Psg
bh
bh
Psg
bh
Psg
Psg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Unit
bh
Set
bh
bh
bh
9,600
4,000
17,200
9,600
34,600
20,700
4,000
9,000
41,600
24,900
3,300
78,600
139,100
4,800
33,300
55,600
50,000
55,600
33,300
58,400
66,700
100,100
420,200
268,400
4,800
66,700
12,400
8,200
50,000
1
2
3
4
5
6
7
8
9
10
11
12
13
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
378,835,000
25,592,000
7,408,000
655,000
201,000
605,000
1,211,000
342,000
453,000
1,262,000
1,851,000
43,136,000
14,958,000
1
2
3
4
5
6
7
8
9
10
11
R. ALAT TUKANG
Cangkul
Karbit
Linggis
Palu
Pengki
Rool Meter 30 Meter ( Bahan besi )
Rool Meter 5 Meter ( Bahan besi )
Singkup
Slang Plastik untuk Water Pas di.0.5cm
Water Pass Alumunium
Ember
bh
Kg
bh
bh
bh
bh
bh
bh
m'
bh
bh
40,200
16,600
68,000
27,300
13,600
91,700
14,500
59,600
1,600
47,300
6,600
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
1
2
3
4
5
6
7
8
9
10
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
154,000
982,300
147,400
56,900
346,300
438,200
276,700
31,900
56,900
23,500
84,800
122,400
101,400
240,500
41,600
119,500
281,000
127,900
31,900
65,300
171,000
261,500
116,800
211,400
498,000
95,900
119,500
65,300
31,900
496,600
23,500
58,400
101,400
122,400
83,400
65,300
83,400
47,300
23,500
23,500
65,300
19,400
261,500
101,400
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
m2 /Dus
bh
50,000
54,000
38,000
43,000
35,000
44,000
41,000
47,000
47,000
1,500
1
2
3
4
U. BAHAN-BAHAN LAINNYA
Alumunium 0.10 mm
Alumunium 0.30 mm
Kusen Pintu WC PVC
Kusen Pintu WC Aluminium
Lbr
Lbr
Set
Set
45,700
100,100
278,300
125,100
1
2
3
4
3
4
V. HARGA BBM
Premium
Minyak Solar
Residu /Ter
Plux Oil
Minyak Bakar
Olie SAE (Mesran, Pertamina)
Ltr
Ltr
Ltr
Ltr
Ltr
Ltr
6,000
5,500
2,800
19,000