PNPM-Mandiri Perdesaan

DAFTAR
HARGA SATUAN DASAR UPAH & BAHAN

No

Uraian

Unit /
Satuan

Harga
Satuan di
Toko (Rp.)

Ongkos
Transport ke
Lokasi (Rp.)

Nilai Harga
Satuan di
Lokasi (Rp.)

KET

6=4+5

BAHAN :

A
1

Semen, @ 50 kg

Zak

70,000

2,000

85,000

Batu kali/gunung

M3

80,000

80,000

Batu bata merah

Bj

500

850

Psr psng

M3

65,000

75,000

Psr Urug

M3

50,000

75,000

Besi dia. 12 mm (Full)

Ujg

Besi dia. 10 mm (Full)

Ujg

95,000

2,000

95,000

Besi dia. 8 mm (Full)

Ujg

85,000

2,000

75,000

Besi dia. 6 mm (Full)

Ujg

58,000

2,000

47,500

10

Kerikil

M3

90,000

80,000

11

Bendrat

Kg

22,000

22,000

12

Angkur Bout dia. 10 mm

Bh

7,000

7,000

13

Paku campur

Kg

20,000

20,000

14

Kayu klas III (Papan mall), L=4

Lbr

15,000

2,000

20,000

15

Kayu klas II uk. 8/12 cm, L=4 m

Ujg

16

Kayu klas II uk. 6/12 cm, L=4 m

Ujg

55,000

2,000

43,200

17

Kayu klas II uk. 6/10 cm, L=4 m

Ujg

45,000

2,000

36,000

18

Kayu klas II uk. 5/7 cm , L=4 m

Ujg

26,500

2,000

21,000

19

Kayu klas II uk. 5/5 cm, L=4 m'

Ujg

8,000

2,000

15,000

20

Kayu kusen klas II uk. 6/15 cm

M'

37,000

2,000

54,000

21

Papan pinggir, uk. 2/25 cm

Lbr

16,000

30,000

22

Kayu Lis/Profil, tbl. 5 cm

Ujg

8,000

1,000

9,000

23

Seng gelombang

Lbr

47,000

5,000

52,000

24

Paku seng

Kg

20,000

20,000

25

Paku triplek

Kg

20,000

20,000

26

Triplek tbl. 3 mm

Lbr

45,000

5,000

50,000

27

Seng Bubungan, L= 1.50 m'

Bh

15,000

2,000

17,000

28

Seng Plat (Talang), Lbr=40 cm

M'

6,000

6,000

29

Plamir tembok

Kg

7,000

7,000

30

Cat tembok

Kg

10,000

10,000

31

Cat kayu

Ltr

33,000

33,000

32

Cat besi

Ltr

33,000

33,000

33

Cat Dasar/Meni

Ltr

30,000

30,000

34

Thinner

Ltr

15,000

15,000

132,500

57,600

PNPM-Mandiri Perdesaan

No

Uraian

Unit /
Satuan

Harga
Satuan di
Toko (Rp.)

Ongkos
Transport ke
Lokasi (Rp.)

Nilai Harga
Satuan di
Lokasi (Rp.)

KET

6=4+5

35

Jendela+Kaca tbl. 3 mm

Bh

100,000

5,000

105,000

36

Tegel keramik uk. 30x30 cm

Dos

40,000

10,000

50,000

37

Tegel keramik uk. 40x40 cm

Dos

45,000

10,000

55,000

38

Tegel keramik uk. 20x20 cm

Dos

38,000

10,000

48,000

39

Engsel jendela

Psg

10,000

1,000

11,000

40

Grendel jendela

Bh

5,000

1,000

6,000

41

Penahan jendela

Bh

10,000

1,000

11,000

42

Kuas cat uk. 4"

Bh

10,000

1,000

11,000

43

Kertas pasir

Lbr

6,000

6,000

44

Alat Peraga

Bh

1,000,000

1,000,000

45

Jungkitan

Bh

200,000

200,000

46

Luncuran

Bh

200,000

200,000

47

Ayunan

Bh

200,000

200,000

48

Mainan Bola Dunia

Bh

1,500,000

50,000

1,550,000

49

Meja+Kursi Guru

Psng

500,000

500,000

50

Meja+Kursi Siswa TK

Psng

150,000

5,000

155,000

51

Papan White Board

Bh

100,000

100,000

52

Papan Sekat

Unit

250,000

250,000

53

Ember cor

Bh

7,500

1,000

8,500

54

Skop

Bh

50,000

2,000

52,000

55

Cangkul

Bh

50,000

2,000

52,000

56

Closet

Bh

100,000

5,000

105,000

57

Wastafel + Kaca

Set

500,000

10,000

510,000

58

Pipa GIP. 1,5"

Ujg

45,000

2,000

47,000

59

PVC dia. 4"

Ujg

90,000

2,000

92,000

60

PVC dia. 2"

Ujg

70,000

2,000

72,000

61

PVC dia. 1"

Ujg

20,000

2,000

22,000

62

Stop kran, uk. 3/4"

Bh

20,000

20,000

63

Pintu Panil : (kayu klas II)

Bh

500,000

5,000

505,000

64

Engsel pintu

Psg

15,000

1,000

16,000

65

Grendel pintu

Bh

5,000

1,000

6,000

66

Kunci pintu

Set

75,000

1,000

76,000

UPAH

B
1

Pekerja

HOK

35,000

35,000

Tukang

HOK

50,000

50,000

PNPM-Mandiri Perdesaan

No

Uraian

Unit /
Satuan

Harga
Satuan di
Toko (Rp.)

Ongkos
Transport ke
Lokasi (Rp.)

Nilai Harga
Satuan di
Lokasi (Rp.)

KET

6=4+5

DETAIL GAMBAR
DENAH BANGUNAN MI

1,5

PEMBANGUNAN GEDUNG MI AL-ISLAMIYAH

4,0

JAWA TIMUR

PROVINSI
B

KABUPATEN

PAMEKASAN
KECAMATAN

8,0

PAMEKASAN
4,0

DESA/KELURAHAN

BUGIH

DETAIL TIANG KOLOM

JENIS PRASARANA

GEDUNG MADIN AL-ISLAMIYAH

0,20M'

LOKASI

1,0

JL. KABUPATEN NO. 42


4,5 M

4,5 M

3,0 M

JUDUL GAMBAR

0,20M'

POTONGAN A - A
POTONGAN MELINTANG

Dia. 6 mm- 15 cm

- DENAH
- POTONGAN

: PEMB. MI AL-ISLAMIYAH

- DETAIL

: A -A
1 : 1000

DETAIL SLOEF
5/7

Dibuat Oleh :

0,12M'

8/12

1,75 M

4 - Dia. 10 mm
DETAIL RING BALOK

6/12
6/12

##
8/12

0,10M'
0,15M'

3,0m'

Diperiksa Oleh

0,10M'
Dia. 6 mm- 15 cm
DETAIL PONDASI

4 - Dia. 10 mm

Dia. 6 mm-15 cm
25 cm'

10
cm
'

25 cm'

25 cm'

( Drs.Ec. Faris Chozien Madani )


15 cm'
15 cm'

P
2

Diketahui Oleh,

15 cm'
15 cm'

( Drs. KH. Mu'arif Thantowi, M.Si. )


50
c
m'

40
cm
'
5
c
m'30
cm
'

P
1
6
0
c
m'

5
5
1c
0m'
c
m'
5 cm'
30
cm
'
319851923.xls

( Salman Alfarisi )

4 - Dia. 10 mm
4 - Dia. 10 mm

50
c
m'

6
0
c
m'
319851923.xls

Lembar ke 01 Dari 4 Lembar

POTONGAN B - B
POTONGAN MEMANJANG

DETAIL GAMBAR

2,4 mtr

PEMBANGUNAN GEDUNG MI AL-ISLAMIYAH

PROVINSI

JAWA TIMUR
KABUPATEN

PAMEKASAN
KECAMATAN

PAMEKASAN
DESA/KELURAHAN

BUGIH
JENIS PRASARANA

GEDUNG MADIN AL-ISLAMIYAH


LOKASI
JL. KABUPATEN NO. 42
JUDUL GAMBAR
DETAIL RANGKA ATAP DAN ATAP SENG

- DENAH
- POTONGAN
- DETAIL

: PEMB. MI AL-ISLAMIYAH
: A -A
:
1 : 1000

Dibuat Oleh :

0,15m'

( Salman Alfarisi )

0,80m'

Diperiksa Oleh

4,18m'

0,80m'
3,5 Mtr

1,60
m'

1,67
m'

1,75 m'

0,80m'
`
5,06m'
0,80m'

1,75 Mtr

0,80m'

( Drs.Ec. Faris Chozien Madani )

0,80m'
1,9 Mtr

3,85 m'

0,89m'

Diketahui Oleh,

3,80 m'
0,80 m'

( Drs. KH. Mu'arif Thantowi, M.Si. )

Lembar ke

319851923.xls

02 Dari 4 Lembar

DETAIL KUSEN PINTU 2

DETAIL KUSEN PINTU 1

Ukuran Pintu KM/wc


1,9 x 0,8 Mtr

DETAIL GAMBAR
PEMBANGUNAN GEDUNG MI AL-ISLAMIYAH

0,50M'

PROVINSI

JAWA TIMUR
KABUPATEN

PAMEKASAN
KECAMATAN

PAMEKASAN

BALOK : 2,5/12-0.05

DESA/KELURAHAN

BUGIH

JENIS PRASARANA

GEDUNG MADIN AL-ISLAMIYAH


BALOK : 6/12

LOKASI
JL. KABUPATEN NO. 42

1,90M'

2,40M'

- DENAH
- POTONGAN
- DETAIL

JUDUL GAMBAR
: PEMB. MI AL-ISLAMIYAH
: A -A
:
1 : 1000

Dibuat Oleh :

( Salman Alfarisi )
Diperiksa Oleh
DETAIL KUSEN JENDELA 1

DETAIL KUSEN JENDELA 2

0,50M'

( Drs.Ec. Faris Chozien Madani )


Diketahui Oleh,

1,0M'

( Drs. KH. Mu'arif Thantowi, M.Si. )

Lembar ke 03 Dari 4 Lembar

319851923.xls

DETAIL GAMBAR
PEMBANGUNAN GEDUNG MI AL-ISLAMIYAH

TAMPAK SAMPING KANAN

TAMPAK BELAKANG
PROVINSI

JAWA TIMUR
KABUPATEN

PAMEKASAN
KECAMATAN

PAMEKASAN
DESA/KELURAHAN

BUGIH
JENIS PRASARANA

GEDUNG MADIN AL-ISLAMIYAH


LOKASI
JL. KABUPATEN NO. 42
JUDUL GAMBAR
- DENAH
- POTONGAN
- DETAIL

: PEMB. MI AL-ISLAMIYAH
: A -A
:
1 : 1000

Dibuat Oleh :
TAMPAK SAMPING KIRI

TAMPAK DEPAN

( Salman Alfarisi )
Diperiksa Oleh

( Drs.Ec. Faris Chozien Madani )


Diketahui Oleh,

( Drs. KH. Mu'arif Thantowi, M.Si. )

Lembar ke 04 Dari4 Lembar

319851923.xls

DAFTAR HARGA SATUAN


BAHAN, ALAT DAN UPAH
Desa
Kecamatan
Kabupaten

NO
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

319851923.xls

:
:
:

UPAH/BAHAN/ALAT
BAHAN
Batu Kali
Pasir Pasang
Pasir Urug/ Sirtu
Krikil
Batu Bata
Semen @ 50 Kg
Besi O 12"Full 12 mtr)
Besi O 10"Full 12 mtr)
Besi O 8" (full 12 mtr)
Besi O 6" Full 12 mtr)
Seng Gelombang
Seng Plat (bumbungan)
Seng Bubungan
Anker bout
Kayu Klas II(8/12)
Kayu Klas II(6/12)
Kayu Klas II(5/7)
Kayu Klas II(5/5)
Kayu Klas II Papan Pinggir
Kayu Mall Klas III
Kayu Kosen 6/15
Lis Profil
Kertas Pasir
Paku Campur
Bendrat
Tripleks 2,8 mm
Paku Tripleks
Paku seng
Paku sekrup
Engsel Pintu
Engsel Jendela
Grendel Pintu
Grendel jendela
Handle Pintu
Handle Jendela
Penyangga Jendela
Kunci Pintu
Pintu Panil Kayu Klas II
Jendela + Kaca
Thinner
Meni
Cat Tembok @ 5 Kg
Cat Kayu @ 1 Liter
Plamur Tembok
Pipa PVC Dia. 4 "
Pipa Giv.1.5"
Keramik (30x30)cm
Tegel Keramik 40x40 cm
Closet
Wastafel+ Kaca
Alat Peraga
Meja Siswa+Kursi
Kursi Siswa
Meja +Kursi Guru Biasa
Papan Tulis
Papan Sekat
Lemari Buku 2 badan
Jungkitan

SAT.

M3
M3
M3
M3
M3
Bh
Btg
Btg
Btg
Btg
Lbr
M'
Bh
bh
Ujg
Ujg
Ujg
Ujg
Lbr
Lbr
Ujg
ujg
Lbr
Kg
Kg
Lbr
Kg
Kg
Dos
Psg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Klg
Klg
kg
Klg
Kg
Ujg
Ujg
Doz
Doz
Bh
Set
Set
bh
bh
bh
bh
Bh
bh
Bh

Type /
Merk

HARGA SATUAN
Harga Survey
Supl. I

Supl. II

Supl. II

Realisasi
Pelaksanaan
80,000
75,000
50,000
80,000
850
85,000
132,500
95,000
70,000
47,500
52,000
49,000
17,000
7,000
57,600
36,000
21,000
20,000
30,000
20,000
54,000
9,000
6,000
20,000
20,000
49,250
25,000
20,000
25,000
16,000
4,500
6,000
6,000
7,500
5,000
11,000
76,000
505,000
100,000
21,000
21,000
10,000
37,500
7,000
92,000
47,000
48,000
55,000
105,000
500,000
500,000
155,000
50,000
500,000
175,000
250,000
500,000
200,000

KET.

II
1
2
3
4
5
6
7

ALAT
Sekop
Pacul
Kuas Rol
Kuas Biasa
Paku Well
Gergaji Besi
Timba Cor

III UPAH
1 Pekerja
2 Tukang

319851923.xls

Bh
Bh
Bh
Bh
Bh
Bh
Bh

52,000
52,000
20,000
11,000
50,000
17,500
8,500

HOK
HOK

35,000
50,000

REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB) BAHAN & HOK
SARANA / PRASARANA
Propinsi
Kabupaten
Kecamatan

Desa
Usulan
Jenis Kegiatan : Pemb. MADIN

NO

URAIAN KEGIATAN

I
1

TARGET VOLUME
SAT.
3

PEKERJAAN PERSIAPAN
Pek. Pembersihan&Pas. Bowplank

VOLUME
4

No. RAB
5

Ls

1.00

1.1

1.00
1.00

SUB TOTAL - I
II

1.00
1.00

UPAH
8

SUMBER DANA ( Rp.)

BAHAN
9

ALAT
10

DANA 2
11

DANA 1
12

165,000
165,000

JUMLAH
13

85,000
85,000

165,000
165,000

276,641
27,424

276,641
27,424

PEKERJAAN TANAH
Pek. Galian Tanah
Timbunan Kembali bekas galian

M3
M3

15.59
3.90

2.1
2.2

7.90
0.78

276,641
27,424

Urugan pasir di bawah (pondasi & lantai)


SUB TOTAL - II
PEKERJAAN PASANGAN

M3

57.86

2.3

18.91
27.59

661,753
965,818

4,821,344
4,821,344

5,483,097
5,787,162

5,483,097
5,787,162

1
2

Pek. Pas Batu kali Camp. 1Pc:4Ps


Pek. Pas Batu Kosong

M3
M3

16.55
3.58

3.1
3.2

19.30
0.80

9.65
0.80

1,158,150
67,622

5,680,450
318,222

6,838,600
385,844

6,838,600
385,844

3
4
5

Pek. Pas. Batu bata Camp. 1Pc:4Ps


Pek. Plesteran+Acian, Camp. 1Ps:3Psr
Pas. Lantai Keramik

M2
M2
M2

138.21
255.48
108.12

3.3
3.4
3.5

26.15
9.75
26.73

13.07
4.88
13.36

1,568,814
585,069
1,603,578

11,259,599
3,037,482
6,827,353

12,828,412
3,622,550
8,430,930

12,828,412
3,622,550
8,430,930

82.72

41.76

4,983,232

27,123,105

###

###

1
2

PEKERJAAN BETON
Pek. Beton bertulang
Pek. Beton tak bertulang

SUB TOTAL - III


IV

M3
M3

2.97
7.44

4.1
4.2

SUB TOTAL - IV
V

16.73

3.72

10.14

5.07

771,459
608,398

7,675,619
2,805,390

26.87

8.79

1,379,857

10,481,009

3.87
2.50
4.94

3.87
2.50
4.94

329,044
212,500
420,000

7,525,440
3,015,000
2,793,000

11.31

11.31

961,544

13,333,440

8,447,078
3,413,788
###

8,447,078
3,413,788
###

PEKERJAAN PINTU & JENDELA


1
2
3

Pengadaan & pemasangan kayu kosen


Pengadaan & pemasangan Pintu Panel
Pengadaan & pemasangan Daun Jendela

M1
Bh
Bh

139.36
5.00
21.00

5.1
5.2
5.3

SUB TOTAL - V
VI

7,854,484
3,227,500
3,213,000
###

7,854,484
3,227,500
3,213,000
###

PEKERJAAN KUDA2 & ATAP


1
2
3

Pek. Kuda2 & Ikatan angin


Pek. Gording & bubungan
Pek. Konsul

Bh
M1
Bh

6.00
371.84
6.00

6.1
6.2
6.3

6.00
9.96
1.20

18.00
19.92
2.40

1,110,000
1,344,600
162,000

1,258,500
2,051,760
246,720

2,368,500
3,396,360
408,720

2,368,500
3,396,360
408,720

4
5

Pek. Pengadaan & pemasangan seng gelombang


Pek. Pengadaan & pemasangan seng bubungan

M2
M1

160.30
14.00

6.4
6.5

4.45
1.00

8.91
1.00

601,125
85,000

6,109,211
125,000

6,710,336
210,000

6,710,336
210,000

Pek. Listplank/Papan Pinggir

M1

46.54

6.6

0.97
23.58

1.94
52.16

130,894
3,433,619

31,996
9,823,187

162,890
###

162,890
###

SUB TOTAL - VI
VII
1

PEKERJAAN PLAFOND
Pek. Rangka plafond

M1

483.74

7.1

7.74

15.48

1,044,887

647,004

1,691,891

1,691,891

2
3

Pek. Plafond
Pek. Lis profil plafond

M2
M1

142.96
120.80

7.2
7.3

2.95
3.24
13.93

5.91
3.24
24.62

398,752
275,036
1,718,675

2,514,796
323,571
3,485,372

2,913,548
598,607
5,204,046

2,913,548
598,607
5,204,046

PEKERJAAN FINISHING/PENYELESAIAN
pengecatan Tembok

M2

326.57

8.1

5.47

273,662

643,106

150,514

1,067,282

1,067,282

2
3

pengecatan Kayu
pengecatan Atap seng

M2
M2

84.73
156.80

8.2
8.3

2.69
3.27
11.43

134,485
163,333
571,481

391,352
467,133
1,501,591

44,380
71,867
266,761

570,217
702,333
2,339,833

570,217
702,333
2,339,833

Ls

1.00

9.1

11,992,500
###

12,192,500
###

SUB TOTAL - VII


VIII

SUB TOTAL - VIII


PEKERJAAN MEBEULER, PERLENGKAPAN &
ALAT PERMAINAN
SUB TOTAL - IX
JUMLAH

319851923.xls

BIAYA

TUKANG
7

1
2

III

IX

HOK
PEKERJA
6

12,192,500

200,000

12,192,500

200,000

187.01

151.08

14,099,226

82,761,548

266,761

365,000

###

###

PENGHITUNGAN VOLUME BANGUNAN TK


Provinsi :
Kabupat :
Kecamat :
Desa
:

Nama Kegiatan
Jenis Prasarana
Jenis Penanganan
Lokasi
Volume
No. Rab

:
:
:
:
:
:

Gedung TK
Prasarana Pendidikan
Peningkatan
12 X 8
08

Meter

M2

I TK 1 UNIT
A BAGUNAN GEDUNG TK
1 Pek. Persiapan
1.1 Pek Pasang bowplank
Volume = ((8*9) + (3*8) + (1,25*1,5) / 1)
=
97.9 M2

97,9

2 Pekerjaan Galian & Timbunan


2.1 Volume pondasi dan Galian tanah
Panjang Pondasi P1 = 12+12+8+8+8=48 m'

m'
10
c
m'

Volume P1 = ((0,80+60):(2) * 0.35 m' * 48 m'))

11.760 M3

Panjang Pondasi P2 =12+1+1= 14 m'


Volume P2 = ((0,70+0,50)/(2) * 0.35 m' *14 m'))

2.940 M3

0.8925 M3

15.593 M3

2.2 Pek. Timbunan kembali bekas galian pondasi


Volume = 1/4 x galian pondasi
Volume = 1/4 x( 11,760+3.940+0.8925 )

3.898 M3

2.3 Urugan pasir bawah pondasi T=5cm, Lantai RK T= 55 cm & Lantai Teras& KM/WC T=40 cm
Pas. Batu Kosong
= 0.6 x 0.10x 48
= 0.5 x 0.10x 14
Total

=
=
=

2.88 M3
0.7 M3
3.58 M3

((0.7+0,5)/(2)*0.35))*(1.5+1.5+1.25)
Volume total = P1 + P2 = 11,760 + 3.940+0.8925

55
c

P
1

5 cm'
30
c
m'

Septik P3=

P
2
50
c
m'

40
c
m'
1
0
c
m
'

5 cm'
30
c
m'

60
c
m'

5
5
1c
0m
c'
m
'

P
1

5 cm'
30
c
m'

6
0
c
m
'

Pondasi

Volume = (48 x 0.6 x 0.05)+(14.0 x 0.5 x 0.05)

1.790 M3

Lantai

Volume =

=
=
=
=

36.62
17.31
1.54
0.60

57.86 M3

13.440 M3

Volume P2 = ((0,25+0,40):(2) x 0.6 m' x 14 m'))


Panjang Tangga P3 = 2 m'

2.730 M3

Volume P3 = ((0,75 x 0.25 m') x 2 m'))

0.375 M3

Volume total = P1 + P2 + P3 = 13,440 + 2.730 + 0.375

16.545 M3

KM/wc

((((9-0,15)+(8-0,50))/2)*(((8-0.15)+(8-0,50))/2))*0,55)+
((((8-0,15) +(8-0,50))/2)*(((3-0,15)+(3-0,50)/2))*0,55)+
((((3-0.12)+(3-0.175)/2)*((1,5-0,12)+(1,5-0,175))/2*0,4)
((((1.5-0.12)+(1.5-0.175)/2)*((1,25-0,12)+(1,25-0,175))/2*0,4)

Volume total

1.79+36,62+17,31+1,54+0,60

M3
M3
M3
M3

3 Pekerjaan Pasangan
3.1 Pek. Pas Batu kali 1:4
Panjang Pondasi P1 = 48 m'
Volume P1 = ((0,3+0,5):(2) x 0.7 m' x 48 m'))
Panjang Pondasi P2 = 14 m'

3.2 Pek. Batu bata 1:4


Dinding depan

319851923.xls

volume = ((( 3*12 )-(((1,2*1,4)*4)+((0,6*1,4)*2)+(1,6*2,4)+(1*2,4))

Dinding samping
Dinding tengah

volume = (((3*8)*2))+(((0,5*3)*2,5)*2)
volume = ((3*8)-(1*2,4))

=
=
=

21.36 M2
55.5 M2
21.6 M2

Dinding belakang
Dinding KM / wc

volume = ((( 3*12 )-(((1,2*1,4)*4)


volume = ((( 2.5*4.25 )-(((0,2*0,4)*2)

=
=

29.28 M2
10.465 M2

Volume Total = 21,36 + 43,5 + 15,6 + 29,28

138.21 M2

3.3 Pek. Plesteran trasraam + Acian T=1,5 cm 1:3


Dinding depan
volume = (21,36*2)
Dinding samping
volume = (55,5 * 2)
Dinding Tengah
volume = (21.6*2)
Dinding belakang
volume = ((29,28*2)
-

Dinding KM / wc

=
=
=
=

42.72
111.0
43.2
58.56

M2
M2
M2
M2

volume = ((10.465*2)
Volume Total = 42,72+87,0+31,2+58,56

=
=

20.93 M2
255.48 M2

Volume = ((8-0,15)*(9-0,15))

69.47 M2

Volume = ((3-0,15)*(8-0,15))
Volume = (12*1,0)
Volume = (1.5*1,25)

=
=
=

22.37 M2
12.00 M2
4.28 M2

Volume Total = 45,926+22,52+38,05

108.12 M2

4.1 Sloef 12 x 15 cm

Volume = (0,12*0,15)*46.25

0.8325 M3

4.2 Tiang Kolom 20 x 20 cm


Tiang Kolom 15 x 20 cm KM/wc
4.5 Ring balok 10 X 10 cm

Volume = (((0,20*0,20)*2,75)*11)
Volume = (((0,15*0,20)*2,5)*3)
Volume = ((0,10*0,10)*66.43)

=
=
=

1.21 M3
0.225 M3
0.664 M3

Volume = ((0,10*0,10)*4,25)
Volume Total = 1,1925+1,21+0,225+0,48+0,043

=
=

0.043 M3
2.97 M3

Volume = (8-0,12)*(9-0,12)*0,07
Volume = (8-0,12)*(3-0,12)*0,07
Volume = (1,0*12)*0,07
Volume = (1.5-0,12)*(1.25-0,12)*0,07
Volume Total = 4,90+1,59+0,84+0,11= 7,44 M3

=
=
=
=
=

4.90
1.59
0.84
0.11
7.44

M3
M3
M3
M3
M3

Volume = (((2,4*2)+(1,75*2))*0,06)*0,12)
Volume = (((2,4*2)+(1,10*2))*0,06)*0,12)*2
Volume = (((1.9*2)+(0,8*1))*0,06)*0,12)*1
Volume = (((1,4*3)+(1,2*3)*0,06)*0,12)*7
Volume = (((1,4*3)+(1,2*3)*0,06)*0,12)*3
Volume = (((0,85*0,03)*0,12)*4)*2
Volume = (((0.95*0,03)*0,12)*4)*2
Volume = (((0,65*0,03)*0,12)*4)*21

=
=
=
=
=
=
=
=

0.060
0.101
0.033
0.393
0.168
0.024
0.027
0.197

M3
M3
M3
M3
M3
M3
M3
M3

3.6 Pas. Keramik


Lantai Ruang Belajar
-

Lantai Ruang Dewan guru


Lantai Selasar
Lantai KM/WC

4 Pekerjaan Beton bertulang 1:2:3

Ring balok 10 X 10 cm km/wc


5 Pekerjaan Beton Tumbuk 1:3:5
5.1 Lantai ; T=7cm
-

5.2

Ruang Belajar
Lantai Ruang Dewan guru
Lantai Selasar
Lantai KM/WC

6 Pekerjaan Kayu
6.1 Pek. kosen Pintu (1,64x2,40) 1 unit
Pek. kosen Pintu (1x2,40) 2 unit
Pek. kosen Pintu WC(1x1,9) 1 unit
Pek. kosen Jendela (1,2x1,40)10 unit
Pek. kosen Jendela (0,5x1,40)2 unit
Pek. Jalus Pintu 2 buah
Pek. Jalus Pintu 2 buah
Pek. Jalus jendela 21 buah
( Kayu kelas II )
6.2 Pek. Pintu dan Jendela
Pek. Daun Pintu (0,80X2), 2 buah

1.003 M3
Volume = ((0,80*0,03)*2)*2

0.096 M3

Pek. Daun Pintu (0.90X2), 2 buah


Pek. Jendela (0,6X0,96), 21 bh
( Kayu kelas II )

Volume = ((0.90*0,03)*2)*2
Volume = ((0.96*0,03)*0.06)*3)+(((0.60*0,03)*0.06)*4)*21)

=
=
=

0.108 M3
0.200 M3
0.404 M3

Kaca Jendela

Volume = (0,86*0,49)*21

8.849 M2

Volume = (0,06*0,12)*14

0.101 M3

Volume = (((0,08*0,12)*12,0)*1
Volume = (((0,06*0,12)*3,5)*10
Volume = (((0,06*0,12)*1.90)*10

=
=
=

0.115 M3
0.252 M3
0.137 M3

Volume = (((0,08*0,12)*1,75)*5
Volume = (((0,08*0,12)*8,0)*5
Volume = (((0,06*0,12)*5,60)*5
Volume = (((0,06*0,10)*5,60)*5

=
=
=
=

0.084
0.384
0.168
0.168

Volume = (((0,05*0,07)*14)*16
Volume = (((0,05*0,07)*3.7)*4*2

=
=
=

1.409 M3
0.784 M3
0.104 M3

Volume = (5,6 x14)+(5,6*14)+(2*1,75)

0.888 M3
160.3 M2

Volume = 14 m'
Volume = (0,25*0,025)*46,54

=
=

14 M1
0.29 M3

6.3 Pek. Rangka Atap


Kayu kls II

- Balok bumbungan

- Ring balok/Melintang
- Balok Jepit
- Kuda-Kuda Vertikal

- Tiang Raja
- Ring balok/tumpuan
- Rangka (tumpuan gordyng)

Jumlah
Kayu Kls III

6.3 -

- Gordyng
- Ikatan Angin

Pek. Atap (seng gelombang)

Seng Bumbungan
6.4 Listplank L= 46,54 M'

319851923.xls

M3
M3
M3
M3

7 Pekerjaan Plafon
- Pek Rangka Plafon = Melintang
Kayu kls III
= Memanjang
Selasar

Volume = ((8,60/0,5)+1)-(0,12*2))*12
= (215,52 m1 *0,05)*0,05
Volume = ((12/0,5)+1)-(0,12*3))*8,60
= (211,9 m1 *0,05)*0,05

=
=
=
=

Melintang

Volume = ((1/0,5)+1)-(0,12*1))*12.0
= (31,68 m1 *0,05)*0,05

=
=

31.68 M2
0.08 M3

= Memanjang

Volume = ((12/0,5)+1)-(0,12*1))*1.0
= (24,64 m1 *0,05)*0,05
Volume total

=
=

24.64 M2
0.06 M3
1.21 M3

Volume = (8,60*12)-((0,12*2)*12+(0,12*3)*8
= (11,20*1*2)+(14*1)

=
=

97.44 M2
36.4 M2

=
=

9.12 M2
142.96 M2

volume = (21,36*2)
volume = (43,5 * 2)

=
=

42.72 M2
87.0 M2

- Tripleks

= (1,0*12)-((0,12*1)*12
Sp2
= 188 mtr
7 Pekerjan Pengecatan
7.1 Pek. Cat Tembok
Dinding depan
Dinding samping

Total

M2
M3
M2
M3

Dinding Tengah
Dinding belakang
Dinding Km/Wc

volume = (15,6*2)
volume = ((29,28*2)
volume = ((10,465*2)

=
=
=

31.2 M2
58.56 M2
20.93 M2

Plafon

volume = (7,60*12)-((0,12*2)*12+(0,12*3)*6
Volume Total = 42,72+87,0+31,2+58,56+86,16

=
=

86.16 M2
326.57 M2

=
=

15.36 M2
7.94 M2

7.2 Pek. Cat Minyak


Kosen Pintu + Jalus
Pintu
Kosen jendela+jalus
-

Bingakai Jendela
Lisplank
Seng

Volume = [(2,4*6)*0,24)+(1,75*6)*0,36)+(1,75*16)*0,29

Volume = (2,18*3,64)
Volume = (((1,4*24)*0,24)+((1,4*9)*0,36)+((1,2*18)*0,24)

+((1,2*9)*0,36)+(((0,6*4)*0,29)*21)
Volume = ((((0,6*4)*0,12)+((1*2)*0,15))*21
Volume = (46,54*0,25)+(46,54*0,025)
Volume = (4,18 x14)+(5,06*14)

Volume Total

319851923.xls

215.52
0.54
211.90
0.53

=
=
=
=
=

36.29
12.35
12.80
156.8
241.53

M2
M2
M2
M2
M2

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi
VOLUME
URAIAN

Total
3=4+5

Dari

Dari

DANA 2

DANA 1

Sat

: 010
:
: Pek. Pbrsihan
:
1.00

JUMLAH HARGA SATUAN

Harga
Satuan
(Rp.)

DANA 2

DANA 1

Total

( Rp. )

( Rp. )

( Rp. )

8=4*7

9=5*7

9=8+9

I. B A H A N

II.

1 Kayu lata, uk. 5/5 cm

5.00

5.00

Ujng

15,000

75,000

2 Paku Campur

0.25

0.25

Kg

20,000

5,000

Sub Total. I

80,000

ALAT
1 Cangkul

Bh

52,000

2 Sekop

Bh

52,000

3 Gergaji

Bh

4 Tali Senar

Roll

5 Selang Waterpass

M'

Sub Total. II

III. U P A H
1 Pekerja

1.00

###

HOK

35,000

35,000

35,000

2 Tukang

1.00

###

HOK

50,000

50,000

50,000

Sub Total. II

85,000

85,000

165,000

85,000

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

165,000

Sumber Dana
Dari Dana 1
Catatan :

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1

Total
3=4+5

VOLUME
Dari
Dana 2
4

Dari
Dana 1
5

Sat

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

: 2.1
:
: Galian Tanah
:
15.59

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

I. B A H A N

Sub Total. I
II.
1
2
3
4
5
6

ALAT
Cangkul
Sekop
Gergaji
Tali Senar
Selang Waterpass
Ember

Bh
Bh
Bh
Roll
M'
Bh
Sub Total. II

III. U P A H
1 Pekerja

7.90

7.90

35,000

276,641

276,641

Sub Total. II

276,641

276,641

276,641

276,641

HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 2
Catatan :

276,641

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1

Total
3=4+5

VOLUME
Dari
Dana 2
4

Dari
Dana 1
5

Sat

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

: 2.2
:
: Timbunan Tnh
:
3.90

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

I. B A H A N

II.

ALAT
1 Cangkul
2 Sekop
3 Ember

III. U P A H
1 Pekerja

Sub Total. I

Sub Total. II

Bh
Bh
Bh

0.78

0.78

35,000

27,424

27,424

Sub Total. II

27,424

27,424

27,424

27,424

HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

27,424

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I. B A H A N
1 Pasir Urug

II.

Total
3=4+5

VOLUME
Dari
Dana 2
4

64.28

Dari
Dana 1
5

64.28

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

75,000

4,821,344

4,821,344

Sub Total. I

4,821,344

4,821,344

Sub Total. II

M3

ALAT
1 Cangkul
2 Sekop
3 Ember

III. U P A H
1 Pekerja

Sat

: 2.3
:
: Timb. Pasir
:
57.86

Bh
Bh
Bh

18.91

18.91

35,000

661,753

661,753

Sub Total. II

661,753

661,753

5,483,097

5,483,097

HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

5,483,097

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3

II.
1
2
3
4
5

2
BAHAN
Semen @ 50 Kg
Pasir pasang
Batu kali/gunung

Total
3=4+5

VOLUME
Dari
Dana 2
4

41.36
8.27
19.30

Dari
Dana 1
5

41.36
8.27
19.30

Sat

Harga
Satuan
(Rp.)

3,515,813
620,438
1,544,200

3,515,813
620,438
1,544,200

Sub Total. I

5,680,450

5,680,450

Bh
Bh
Bh
Bh
Roll

Sub Total. II
III. U P A H
1 Pekerja
2 Tukang

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

85,000
75,000
80,000

Zak
M3
M3

ALAT
Cangkul
Sekop
Ember
Tropol
Selang waterpass

Dana 2
( Rp. )
8=4*7

: 3.1
:
: Pas. Bt Kali
:
16.55

19.30
9.65

19.30
9.65

35,000
50,000

675,588
482,563

675,588
482,563

Sub Total. II

1,158,150

1,158,150

6,838,600

6,838,600

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

6,838,600

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1

I. B A H A N
1 Batu kali/gunung

II.

Total
3=4+5

VOLUME
Dari
Dana 2
4

3.98

Dari
Dana 1
5

3.98

Sat

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

: 3.2
:
: Pas. Bt Kosong
:
3.58

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

80,000

318,222

318,222

Sub Total. I

318,222

318,222

Sub Total. II

M3

ALAT

III. U P A H
1 Pekerja
2 Tukang

0.80
0.80

0.80
0.80

35,000
50,000

27,844
39,778

27,844
39,778

Sub Total. II

67,622

67,622

385,844

385,844

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

385,844

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3

II.
1
2
3
4
5

2
BAHAN
Semen @ 50 Kg
Pasir pasang
Batu bata merah

Total
3=4+5

VOLUME
Dari
Dana 2
4

28.01
5.60
9,950.76

Dari
Dana 1
5

Sat

Harga
Satuan
(Rp.)

28.01
5.60
9,950.76

Zak
M3
M2

ALAT
Cangkul
Sekop
Ember
Tropol
Selang waterpass

85,000
75,000
850

Sub Total. I

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

2,381,235
420,218
8,458,146

###

2,381,235
420,218
8,458,146

11,259,599

Bh
Bh
Bh
Bh
Roll

Sub Total. II
III. U P A H
1 Pekerja
2 Tukang

Dana 2
( Rp. )
8=4*7

: 3.3
:
: Pas. Bt Bata
:
138.21

26.15
13.07

26.15
13.07

35,000
50,000

915,141
653,672

915,141
653,672

Sub Total. II

1,568,814

1,568,814

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

###

12,828,412
-

Sumber Dana
Dari Dana 1
Catatan :

12,828,412

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

URAIAN
1

I. B A H A N
1 Semen @ 50 Kg
2 Pasir pasang

II.
1
2
3
4
5

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

Total
3=4+5

VOLUME
Dari
Dana 2
4

33.15
2.93

Dari
Dana 1
5

33.15
2.93

Sat

Harga
Satuan
(Rp.)

2,818,081
219,401

2,818,081
219,401

Sub Total. I

3,037,482

3,037,482

Bh
Bh
Bh
Bh
Roll

Sub Total. II
III. U P A H
1 Pekerja
2 Tukang

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

85,000
75,000

Zak
M3

ALAT
Cangkul
Sekop
Ember
Tropol
Selang waterpass

Dana 2
( Rp. )
8=4*7

: 3.4
:
: Plester+Aci
:
255.48

9.75
4.88

9.75
4.88

35,000
50,000

341,290
243,779

341,290
243,779

Sub Total. II

585,069

585,069

3,622,550

3,622,550

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

3,622,550

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3

II.
1
2
3
4
5

2
BAHAN
Semen @ 50 Kg
Pasir pasang
Tegel Keramik

Total
3=4+5

VOLUME
Dari
Dana 2
4

14.58
2.43
108.12

Dari
Dana 1
5

14.58
2.43
108.12

Sat

Harga
Satuan
(Rp.)

1,239,128
182,225
5,406,000

1,239,128
182,225
5,406,000

Sub Total. I

6,827,353

6,827,353

Bh
Bh
Bh
Bh
Roll

Sub Total. II
III. U P A H
1 Pekerja
2 Tukang

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

85,000
75,000
50,000

Zak
M3
Dos

ALAT
Cangkul
Sekop
Ember
Tropol
Selang waterpass

Dana 2
( Rp. )
8=4*7

: 3.5
:
: Lt. Keramik
:
108.12

26.73
13.36

26.73
13.36

35,000
50,000

935,420
668,157

935,420
668,157

Sub Total. II

1,603,578

1,603,578

8,430,930

8,430,930

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

8,430,930

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3
4
5
6
7
8

II.
1
2
3
4
5
6

2
BAHAN
Semen @ 50 Kg
Pasir pasang
Kerikil
Bendrat
Besi 8 mm
Besi 6 mm
Paku Campur
Papan mall

Total
3=4+5

VOLUME
Dari
Dana 2
4

14.87
1.39
2.79
2.79
55.00
34.00
2.97
11.15

Dari
Dana 1
5

14.87
1.39
2.79
2.79
55.00
34.00
2.97
11.15

Sat

Harga
Satuan
(Rp.)

1,264,078
104,565
223,073
61,345
4,125,000
1,615,000
59,486
223,073

1,264,078
104,565
223,073
61,345
4,125,000
1,615,000
59,486
223,073

Sub Total. I

7,675,619

7,675,619

Bh
Bh
Bh
Bh
Roll
Bh
Sub Total. II

III. U P A H
1 Pekerja
2 Tukang

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

85,000
75,000
80,000
22,000
75,000
47,500
20,000
20,000

Zak
M3
M3
Kg
Ujng
Ujng
Kg
Lbr

ALAT
Cangkul
Sekop
Ember
Tropol
Selang waterpass
Gergaji

Dana 2
( Rp. )
8=4*7

: 4.1
:
: Beton brtlang
:
2.97

16.73
3.72

16.73
3.72

35,000
50,000

585,565
185,894

585,565
185,894

Sub Total. II

771,459

771,459

8,447,078

8,447,078

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

8,447,078

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3

II.
1
2
3
4
5
6

2
BAHAN
Semen @ 50 Kg
Pasir pasang
Kerikil

Total
3=4+5

VOLUME
Dari
Dana 2
4

23.66
3.38
6.76

Dari
Dana 1
5

23.66
3.38
6.76

Sat

Harga
Satuan
(Rp.)

2,011,093
253,499
540,798

2,011,093
253,499
540,798

Sub Total. I

2,805,390

2,805,390

Bh
Bh
Bh
Bh
Roll
Bh
Sub Total. II

III. U P A H
1 Pekerja
2 Tukang

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

85,000
75,000
80,000

Zak
M3
M3

ALAT
Cangkul
Sekop
Ember
Tropol
Selang waterpass
Gergaji

Dana 2
( Rp. )
8=4*7

: 4.2
:
: Beton Rabat
:
7.44

10.14
5.07

10.14
5.07

35,000
50,000

354,899
253,499

354,899
253,499

Sub Total. II

608,398

608,398

3,413,788

3,413,788

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

3,413,788

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1

I. B A H A N
1 Kusen Pintu, Jendela &
Ventilasi

II.

Total
3=4+5

VOLUME
Dari
Dana 2
4

139.36

Dari
Dana 1
5

139.36

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

54,000

7,525,440

7,525,440

Sub Total. I

7,525,440

7,525,440

Sub Total. II

M'

ALAT
1 Selang waterpass

III. U P A H
1 Pekerja
2 Tukang

Sat

: 5.1
:
: Pek. Kusen
:
139.36

Bh

3.87
3.87

3.87
3.87

35,000
50,000

135,489
193,556

135,489
193,556

Sub Total. II

329,044

329,044

7,854,484

7,854,484

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

7,854,484

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3
4

II.

2
BAHAN
Pintu Type. P1&P2
Kunci Pintu
Engsel Pintu
Grendel Pintu

Total
3=4+5

VOLUME
Dari
Dana 2
4

5.00
5.00
5.00
5.00

Dari
Dana 1
5

5.00
5.00
5.00
5.00

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

505,000
76,000
16,000
6,000

2,525,000
380,000
80,000
30,000

2,525,000
380,000
80,000
30,000

Sub Total. I

3,015,000

3,015,000

Sub Total. II

Bh
Bh
Psng
Bh

ALAT
1 Selang waterpass

III. U P A H
1 Pekerja
2 Tukang

Sat

: 5.2
:
: Pek.Pintu Panel
:
5.00

Bh

2.50
2.50

2.50
2.50

35,000
50,000

87,500
125,000

87,500
125,000

Sub Total. II

212,500

212,500

3,227,500

3,227,500

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

3,227,500

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3
4

II.

2
BAHAN
Jendela+kaca
Engsel Jendela
Grendel Jendela
Penahan Jendela

Total
3=4+5

VOLUME
Dari
Dana 2
4

21.00
21.00
21.00
21.00

Dari
Dana 1
5

21.00
21.00
21.00
21.00

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


DANa 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

105,000
11,000
6,000
11,000

2,205,000
231,000
126,000
231,000

2,205,000
231,000
126,000
231,000

Sub Total. I

2,793,000

2,793,000

Sub Total. II

Bh
Psng
Bh
Bh

ALAT
1 Selang waterpass

III. U P A H
1 Pekerja
2 Tukang

Sat

: 5.3
:
: Pek. Jndla+kaca
:
21.00

Bh

4.94
4.94

4.94
4.94

35,000
50,000

172,941
247,059

172,941
247,059

Sub Total. II

420,000

420,000

3,213,000

3,213,000

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari DANa 2

Sumber Dana
Dari Dana 1
Catatan :

3,213,000

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3
4

II.

2
BAHAN
Kayu, II, uk. 6/12 cm
Kayu, II, uk. 5/7 cm
Paku campur
Angker 10 mm

Total
3=4+5

VOLUME
Dari
Dana 2
4

22.50
8.50
1.20
12.00

Dari
Dana 1
5

22.50
8.50
1.20
12.00

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

43,200
21,000
20,000
7,000

972,000
178,500
24,000
84,000

972,000
178,500
24,000
84,000

Sub Total. I

1,258,500

1,258,500

Sub Total. II

Ujng
Ujng
Kg
Bh

ALAT
1 Gergaji
2 Martil

III. U P A H
1 Pekerja
2 Tukang

Sat

: 6.1
:
: Kuda2+iktn angin
:
6.00

Bh
Bh

6.00
18.00

6.00
18.00

35,000
50,000

210,000
900,000

210,000
900,000

Sub Total. II

1,110,000

1,110,000

2,368,500

2,368,500

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

2,368,500

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1

I. B A H A N
1 Paku Campur
2 Kayu Kls II, uk. 5/7 cm

II.

Total
3=4+5

VOLUME
Dari
Dana 2
4

4.98
92.96

Dari
Dana 1
5

4.98
92.96

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


DANa 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

20,000
21,000

99,600
1,952,160

99,600
1,952,160

Sub Total. I

2,051,760

2,051,760

Sub Total. II

Kg
Ujng

ALAT
1 Gergaji
2 Martil
3 Gunting

III. U P A H
1 Pekerja
2 Tukang

Sat

: 6.2
:
: Gording&Bbngan
:
371.84

Bh
Bh
Bh

9.96
19.92

9.96
19.92

35,000
50,000

348,600
996,000

348,600
996,000

Sub Total. II

1,344,600

1,344,600

3,396,360

3,396,360

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

3,396,360

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3

II.

2
BAHAN
Paku Campur
Kayu Kls II, uk. 6/12 cm
Angker Bout 10 mm

Total
3=4+5

VOLUME
Dari
Dana 2
4

0.36
3.60
12.00

Dari
Dana 1
5

0.36
3.60
12.00

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

20,000
43,200
7,000

7,200
155,520
84,000

7,200
155,520
84,000

Sub Total. I

246,720

246,720

Sub Total. II

Kg
Ujng
Bh

ALAT
1 Gergaji
2 Martil

III. U P A H
1 Pekerja
2 Tukang

Sat

: 6.3
:
: Pek. Konsul
:
6.00

Bh
Bh

1.20
2.40

1.20
2.40

35,000
50,000

42,000
120,000

42,000
120,000

Sub Total. II

162,000

162,000

408,720

408,720

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

408,720

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1

I. B A H A N
1 Paku Seng
2 Seng gelombang

II.

Total
3=4+5

VOLUME
Dari
Dana 2
4

4.45
115.77

Dari
Dana 1
5

4.45
115.77

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

20,000
52,000

89,056
6,020,156

89,056
6,020,156

Sub Total. I

6,109,211

6,109,211

Sub Total. II

Kg
Lbr

ALAT
1 Gunting
2 Martil

III. U P A H
1 Pekerja
2 Tukang

Sat

: 6.4
:
: Pek. Atap Seng
:
160.30

Bh
Bh

4.45
8.91

4.45
8.91

35,000
50,000

155,847
445,278

155,847
445,278

Sub Total. II

601,125

601,125

6,710,336

6,710,336

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

6,710,336

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1

I. B A H A N
1 Paku Seng
2 Seng Bubungan

II.

Total
3=4+5

VOLUME
Dari
Dana 2
4

0.30
7.00

Dari
Dana 1
5

0.30
7.00

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

20,000
17,000

6,000
119,000

6,000
119,000

Sub Total. I

125,000

125,000

Sub Total. II

Kg
Lbr

ALAT
1 Gunting
2 Martil

III. U P A H
1 Pekerja
2 Tukang

Sat

: 6.5
:
: Pek. Seng Bbngan
:
14.00

Bh
Bh

1.00
1.00

1.00
1.00

35,000
50,000

35,000
50,000

35,000
50,000

Sub Total. II

85,000

85,000

210,000

210,000

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

210,000

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1

I. B A H A N
1 Paku Campur
2 Kayu papan pinggir

II.

Total
3=4+5

VOLUME
Dari
Dana 2
4

1.16
0.29

Dari
Dana 1
5

1.16
0.29

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

20,000
30,000

23,270
8,726

23,270
8,726

Sub Total. I

31,996

31,996

Sub Total. II

Kg
Lbr

ALAT
1 Gergaji
2 Martil

III. U P A H
1 Pekerja
2 Tukang

Sat

: 6.6
:
: Pek. Lisplank
:
46.54

Bh
Bh

0.97
1.94

0.97
1.94

35,000
50,000

33,935
96,958

33,935
96,958

Sub Total. II

130,894

130,894

162,890

162,890

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

162,890

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1

I. B A H A N
1 Paku Campur
2 Kayu Kelas II, Uk. 5/5 cm

II.

Total
3=4+5

VOLUME
Dari
Dana 2
4

9.67
30.23

Dari
Dana 1
5

9.67
30.2

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

20,000
15,000

193,498
453,506

193,498
453,506

Sub Total. I

647,004

647,004

Sub Total. II

Kg
Ujng

ALAT
1 Gergaji
2 Martil

III. U P A H
1 Pekerja
2 Tukang

Sat

: 7.1
:
: Rangka Plafond
:
483.74

Bh
Bh

7.74
15.48

7.74
15.48

35,000
50,000

270,897
773,990

270,897
773,990

Sub Total. II

1,044,887

1,044,887

1,691,891

1,691,891

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

1,691,891

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1

I. B A H A N
1 Paku Triplek
2 Tripleks tbl. 3 mm

II.

Total
3=4+5

VOLUME
Dari
Dana 2
4

3.54
49.62

Dari
Dana 1
5

3.54
49.62

ALAT
1 Gergaji
2 Martil

III. U P A H
1 Pekerja
2 Tukang

Sat

Harga
Satuan
(Rp.)

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

20,000
49,250

70,889
2,443,907

70,889
2,443,907

Sub Total. I

2,514,796

2,514,796

Sub Total. II

Kg
Lbr

Bh
Bh

2.95
5.91

2.95
5.91

HOK
HOK

35,000
50,000

Sub Total. II
TOTAL BIAYA : ( I+II+III)
Dari Dana 2
Sumber Dana
Dari Dana 1
Catatan :

Dana 2
( Rp. )
8=4*7

: 7.2
:
: Pek. Plafond
:
142.96

103,380
295,372

103,380
295,372

398,752
2,913,548

398,752
2,913,548
2,913,548

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I. B A H A N
1 Paku Campur
2 Lis Profil

II.

Total
3=4+5

VOLUME
Dari
Dana 2
4

2.59
30.20

Dari
Dana 1
5

2.59
30.20

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

20,000
9,000

51,771
271,800

51,771
271,800

Sub Total. I

323,571

323,571

Sub Total. II

Kg
Ujng

ALAT
1 Gergaji
2 Martil

III. U P A H
1 Pekerja
2 Tukang

Sat

: 7.3
:
: Pek. Lis profil
:
120.80

Bh
Bh

3.24
3.24

3.24
3.24

35,000
50,000

113,250
161,786

113,250
161,786

Sub Total. II

275,036

275,036

598,607

598,607

HOK
HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

598,607

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3

II.

2
BAHAN
Plamir tembok
Cat Tembok
Kertas Pasir

ALAT
1 Kuas Cat

III. U P A H
2 Tukang

Total
3=4+5

VOLUME
Dari
Dana 2
4

31.93
22.81
31.93

31.93
22.81
31.93

13.68

5.47

Dari
Dana 1
5

5.47

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

7,000
10,000
6,000

223,491
228,052
191,563

223,491
228,052
191,563

Sub Total. I

643,106

643,106

11,000

150,514

150,514

Sub Total. II

150,514

150,514

50,000

273,662

273,662

Sub Total. II

273,662

273,662

1,067,282

1,067,282

Kg
Kg
Lbr

13.68

Sat

: 8.1
:
: Pek. Cat Tembok
:
326.57

Bh

HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

1,067,282

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3
4

II.

2
BAHAN
Cat dasar/Meni
Cat Kayu
Thinner
Kertas Pasir

ALAT
1 Kuas Cat

III. U P A H
1 Tukang

Total
3=4+5

VOLUME
Dari
Dana 2
4

2.69
6.72
2.69
8.07

2.69
6.72
2.69
8.07

4.03

2.69

Dari
Dana 1
5

2.69

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

30,000
33,000
15,000
6,000

80,691
221,901
40,346
48,415

80,691
221,901
40,346
48,415

Sub Total. I

391,352

391,352

11,000

44,380

44,380

Sub Total. II

44,380

44,380

50,000

134,485

134,485

Sub Total. II

134,485

134,485

570,217

570,217

Ltr
Ltr
Ltr
Lbr

4.03

Sat

: 8.2
:
: Pek. Cat Kayu
:
84.73

Bh

HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

570,217

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3
4

II.

2
BAHAN
Cat dasar/Meni besi
Cat Besi
Thinner
Kertas Pasir

ALAT
1 Kuas Cat

III. U P A H
1 Tukang

Total
3=4+5

VOLUME
Dari
Dana 2
4

4.36
8.71
3.27
-

4.36
8.71
3.27
-

6.53

3.27

Dari
Dana 1
5

3.27

Harga
Satuan
(Rp.)

Dana 2
( Rp. )
8=4*7

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

30,000
33,000
15,000
6,000

130,667
287,467
49,000
-

130,667
287,467
49,000
-

Sub Total. I

467,133

467,133

11,000

71,867

71,867

Sub Total. II

71,867

71,867

50,000

163,333

163,333

Sub Total. II

163,333

163,333

702,333

702,333

Ltr
Ltr
Ltr
Lbr

6.53

Sat

: 8.3
:
: Pek. Cat Besi
:
156.80

Bh

HOK

TOTAL BIAYA : ( I+II+III)


Dari Dana 2

Sumber Dana
Dari Dana 1
Catatan :

702,333

PNPM - Mandiri Perdesaan

Form.7e.

RENCANA ANGGARAN BIAYA (RAB)


SARANA/PRASARANA : PEMB. TK
Propinsi
Kabupaten
Kecamatan
Desa

No. RAB
Program
Jenis Kegiatan
Ukuran/Dimensi

URAIAN
1
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
13
14

II.

2
BAHAN
Alat Peraga
Meja & Kursi Guru
Meja & Kursi Siswa TK
Papan Sekat
Papan Tulis
Ayunan
Jungkitan
Bola dunia
Closset
Wastafel +Kaca
Pipa PVC 4"
Pipa GIP 1.5"
Ember cor
Skop
Cangkul

Total
3=4+5

1.00
1.00
60.00
1.00
2.00
1.00
1.00
1.00
1.00
2.00
1.00
5.00
1.00
1.00

VOLUME
Dari
Dana 2
4

1.00

Dari
Dana 1
5

1.00
1.00
60.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
5.00
1.00
1.00

Sat

Harga
Satuan
(Rp.)

Ls
Psng
Psng
Unit
Unit
Unit
Unit
Unit
Unit
Set
Ujng
Ujng
Bh
Bh
Bh

Dana 2
( Rp. )
8=4*7

: 9.1
:
: Mebeuler dll
:
1.00

JUMLAH HARGA SATUAN


Dana 1
Total
( Rp. )
( Rp. )
9=5*7
9=8+9

500,000
500,000
155,000
250,000
175,000
200,000
200,000
105,000
585,000
92,000
47,000
8,500
52,000
52,000

200,000
-

Sub Total. I

200,000

500,000
500,000
9,300,000
250,000
175,000
200,000
105,000
585,000
184,000
47,000
42,500
52,000
52,000
###

500,000
500,000
9,300,000
250,000
175,000
200,000
200,000
105,000
585,000
184,000
47,000
42,500
52,000
52,000
12,192,500

ALAT

Sub Total. II

Sub Total. II

III. U P A H

TOTAL BIAYA : ( I+II+III)

200,000

###

12,192,500

Dari Dana 2

200,000

Dari Dana 1

11,992,500

Sumber Dana
Catatan :

PNPM - Mandiri Perdesaan

Form.7e.

Ls

PNPM - Mandiri Perdesaan

Form.7e.

m3

PNPM - Mandiri Perdesaan

Form.7e.

M3

PNPM - Mandiri Perdesaan

Form.7e.

M3

PNPM - Mandiri Perdesaan

Form.7e.

M3

PNPM - Mandiri Perdesaan

Form.7e.

M3

PNPM - Mandiri Perdesaan

Form.7e.

M2

PNPM - Mandiri Perdesaan

Form.7e.

M2

PNPM - Mandiri Perdesaan

Form.7e.

M2

PNPM - Mandiri Perdesaan

Form.7e.

M3

PNPM - Mandiri Perdesaan

Form.7e.

M3

PNPM - Mandiri Perdesaan

Form.7e.

M'

PNPM - Mandiri Perdesaan

Form.7e.

Pek.Pintu Panel
Bh

PNPM - Mandiri Perdesaan

Form.7e.

Pek. Jndla+kaca
Bh

PNPM - Mandiri Perdesaan

Form.7e.

Kuda2+iktn angin
Bh

PNPM - Mandiri Perdesaan

Form.7e.

Gording&Bbngan
M'

PNPM - Mandiri Perdesaan

Form.7e.

Bh

PNPM - Mandiri Perdesaan

Form.7e.

M2

PNPM - Mandiri Perdesaan

Form.7e.

Pek. Seng Bbngan


M'

PNPM - Mandiri Perdesaan

Form.7e.

M'

PNPM - Mandiri Perdesaan

Form.7e.

M2

PNPM - Mandiri Perdesaan

Form.7e.

M2

PNPM - Mandiri Perdesaan

Form.7e.

M'

PNPM - Mandiri Perdesaan

Form.7e.

Pek. Cat Tembok


M2

PNPM - Mandiri Perdesaan

Form.7e.

M2

PNPM - Mandiri Perdesaan

Form.7e.

M2

PNPM - Mandiri Perdesaan

Form.7e.

Ls

69 / 87

ANALISA TEKNIK
HARGA SATUAN PEKERJAAN
Propinsi :

Kecamatan :

Kabupaten :

Desa :

Kecamatan:
NO

PEKERJAAN

SAT.

Koeff.
Teknik

Harga
Satuan (Rp.)

Ls

1
I
1

Jumlah Unit : 1 Unit

PEKERJAAN PERSIAPAN
Pek. Pembersihan&Bowplank
a. Upah
Pekerja
Tukang
b. Bahan
Kayu latah, uk. 5/5 cm
Paku Campur
c. Alat

HOK
HOK
Ujng
Kg
Ls

1.000
1.000

35,000
50,000

5.000
20,000
0.250
20,000
1.000
Jumlah Harga/Ls

Volume: Koef X
Vol. Satuan

PEKERJAAN TANAH&PASIR

II
1

Galian Tanah
a. Upah
Pekerja
b. Bahan
c. Alat

M3
HOK

15.59
0.507

35,000

M3
Ls

1.000

7.90

Jumlah Harga/M3

Timbunan kembali bekas galian


a. Upah
Pekerja
b. Bahan
Tanah Timbunan
c. Alat

M3

3.90

HOK

0.201

35,000

3.90

M3

1.100

1.000

4.29
-

Ls

Jumlah Harga/M3

Urugan pasir
a. Upah
Pekerja
b. Bahan
Pasir Urug
c. Alat

PEKERJAAN PASANGAN
Pek. Pas Batu kali, Camp. 1Pc : 4Psr
a. Upah :
Pekerja
Tukang batu
b. Bahan :
Batu kali
Semen
Pasir Pasang
c. Alat

57.856

HOK

0.327

35,000

18.91

M3

1.111

50,000
-

64.28
-

Ls

1.000

M3

16.545

HOK

1.167

HOK

0.583

M3

1.167

Zak

2.500

M3

0.500

Ls

1.000

83.19

35,000
50,000

19.30
9.65

75,000
85,000
75,000
-

19.30
41.36
8.27
16.55

Jumlah Harga/M3
319851923.xls

8.19

M3

Jumlah Harga/M3

III

7.90
-

NO

PEKERJAAN

SAT.

Koeff.
Teknik

Harga
Satuan (Rp.)

Pek. Pas Batu Kosong


a. Upah :
Pekerja
Tukang batu
b. Bahan :
Batu kali
c. Alat

M3

3.580

HOK

0.222

HOK

0.222

M3

1.111

Ls

1.000

70 / 87

Volume: Koef X
Vol. Satuan

35,000
50,000

0.80
0.80

75,000
-

3.98
3.58

Jumlah Harga/M3

Pek. Batu bata, Camp. 1PC : 4Psr


a. Upah :
Pekerja
Tukang batu
b. Bahan :
Batu bata
Semen @ 50 kg
Pasir pasang
c. Alat

M2

###

HOK

0.189

HOK

0.095

Bh

72.000

Zak

0.203

0.041

Ls

1.000

35,000
50,000

26.15
13.07

850
85,000
50,000
-

9,950.76
28.01
5.60
10,024

Jumlah Harga/M2

Pek. Pelester+Aci, Camp. 1Pc : 3Psr


a. Upah :
Pekerja
Tukang
b. Bahan :
Semen @ 50 kg
Pasir pasang
c. Alat

M2

###

HOK

0.038

HOK

0.019

Zak

0.130

0.011

Ls

1.000

35,000
50,000

9.75
4.88

85,000
50,000
-

33.15
2.93

Jumlah Harga/M2

Pas. Keramik, Camp. 1Pc : 2Psr


a. Upah :
Pekerja
Tukang
b. Bahan :
Tegel Keramik
Semen @ 50 kg
Pasir pasang
c. Alat

M2

###

HOK

0.247

HOK

0.124

Dos

1.000

Zak

0.135

M3

0.022

Ls

1.000

35,000
50,000

26.73
13.36

55,000
85,000
50,000
-

108.12
14.58
2.43

Jumlah Harga/M2

IV
1

319851923.xls

PEKERJAAN BETON
Beton bertulang Camp, 1:2:3
a. Upah :
Pekerja
Tukang
b. Bahan :
Semen @ 50 kg
Kerikil
Pasir pasang
Besi 10 mm (full), L = 12 m'
Besi 6 mm (full), L = 12 m'
Bendrat
Paku campur
Papan mall kayu kelas III

M3

2.974

HOK

5.625

HOK

1.250

Zak

5.000

0.938

0.469

Ujng

18.492

Ujng

11.431

kg

0.938

kg

1.000

Lbr

3.750

35,000
50,000

16.73
3.72

85,000
80,000
50,000
95,000
47,500
20,000
20,000
20,000

14.87
2.79
1.39
55.00
34.00
2.79
2.97
11.15

NO

PEKERJAAN

2
c. Alat

SAT.
3
Ls

Koeff.
Teknik

Harga
Satuan (Rp.)

1.000
Jumlah Harga/M3

319851923.xls

71 / 87

Volume: Koef X
Vol. Satuan

NO

PEKERJAAN

SAT.

Koeff.
Teknik

Harga
Satuan (Rp.)

Beton Rabat Camp, 1:3:5


a. Upah :
Pekerja
Tukang batu
b. Bahan :
Semen @ 50 kg
Kerikil
Pasir pasang
c. Alat

M3

7.436

HOK

1.364

HOK

0.682

Zak

3.182

0.909

0.455

Ls

1.000

72 / 87

Volume: Koef X
Vol. Satuan

35,000
50,000

10.14
5.07

85,000
80,000
50,000
-

23.66
6.76
3.38

Jumlah Harga/M3

V
1

PEKERJAAN PINTU & JENDELA


Pengadaan & pemasangan
Kusen Pintu, jendela & Ventilasi
a. Upah Pasang :
Pekerja
Tukang batu

M1

1.003

HOK

0.028

HOK

0.028

b. Bahan :
Kayu Kusen Kelas II Uk. 6/15 cm

M1

1.000

c. Alat

Ls

1.000

35,000
50,000

0.03
0.03

54,000
-

1.00
1.00

Jumlah Harga/M1

Pengadaan & pemasangan


Pintu panel & assesorisnya
a. Upah :
Pekerja
Tukang batu
b. Bahan :
Pintu Panel Kayu Kelas II
Kunci Pintu
Engsel Pintu
Grendel Pintu
c. Alat

BH

5.000

HOK

0.500

HOK

0.500

Bh

1.000

Bh

1.000

Psng

1.000

Bh

1.000

Ls

1.000

35,000
50,000

2.50
2.50

505,000
76,000
16,000
6,000
-

5.00
5.00
5.00
5.00

Jumlah Harga/Bh

Pengadaan & pemasangan


Daun jendela+kaca
a. Upah :
Pekerja
Tukang batu
b. Bahan :
Jendela kelas II+Kaca
Engsel Jendela
Grendel Jendela
Penahan Jendela
c. Alat

Bh

19.000

HOK

0.235

HOK

0.235

Bh

1.000

Psng

1.000

Bh

1.000

Bh

1.000

Ls

1.000

35,000
50,000

4.47
4.47

100,000
4,500
6,000
11,000
-

19.00
19.00
19.00
19.00

Jumlah Harga/Bh

319851923.xls

NO

PEKERJAAN

SAT.

Koeff.
Teknik

Harga
Satuan (Rp.)

VI
1

PEKERJAAN KUDA2 & ATAP


Pek.Kuda-Kuda & Ikatan angin
a. Upah :
Pekerja
Tukang Kayu
b. Bahan :
Paku Campur
Anker Bout
Kayu Kelas II (8/12) cm
Kayu Kelas II (6/12) cm
Kayu Kelas II (5/7) cm
c. Alat

Bh

6.000

HOK

1.000

HOK

3.000

kg

0.200

Bh

2.000

Ujg

0.437

Ujg

3.750

Ujg

1.750

Ls

1.000

73 / 87

Volume: Koef X
Vol. Satuan

35,000
50,000

6.00
18.00

20,000
7,000
57,600
36,000
21,000
-

1.20
12.00
2.62
22.50
10.50
-

Jumlah Harga/Bh

Pek. Gording & Bubungan


a. Upah :
Pekerja
Tukang Kayu
b. Bahan :
Paku Campur
Kayu Kls II, uk. 5/7 cm
c. Alat

M1

###

35,000
50,000

10
19

0.250

20,000
21,000

5
89
-

1.000

HOK

0.027

HOK

0.054

kg

0.013

Ujg
Ls

Jumlah Harga/M'

Pek. Konsul, Uk. 6/12 cm


a. Upah :
Pekerja
Tukang Kayu
b. Bahan :
Paku Campur
Kayu Kls II, uk. 6/12 cm
Angker Bout 10 mm
c. Alat

Bh

8.000

HOK

0.200

HOK

0.400

kg

0.060

Ujg

0.600

Bh

2.000

Ls

1.000

35,000
50,000

1.60
3.20

20,000
36,000
7,000
-

0.48
4.80
16.00
8.00

Jumlah Harga/Bh

Pek. Pengadaan & pemasangan


Atap Seng gelombang
a. Upah :
Pekerja
Tukang Kayu
b. Bahan :
Paku Seng
Seng gelombang BJLS 20
c. Alat

M2

###

HOK

0.028

HOK

0.056

kg

0.028

lbr

0.722

Ls

1.000

35,000
50,000

4.45
8.91

20,000
52,000
-

4.45
115.77

Jumlah Harga/M2

Pek. Pengadaan & pemasangan


Seng Bubungan
a. Upah :
Pekerja
Tukang Kayu
b. Bahan :
Paku Seng
Seng Bubungan

319851923.xls

M'

14.000

HOK

0.071

HOK

0.071

kg

0.021

Lbr

0.500

35,000
50,000

1.0
1.0

20,000
17,000

0.3
7.0

NO

PEKERJAAN

2
c. Alat

SAT.
3
Ls

Koeff.
Teknik

Harga
Satuan (Rp.)

1.000
Jumlah Harga/M'

319851923.xls

74 / 87

Volume: Koef X
Vol. Satuan

NO

PEKERJAAN

SAT.

Koeff.
Teknik

Harga
Satuan (Rp.)

M'

46.540

Pek.Lisplank
a. Upah :
Pekerja
Tukang Kayu

HOK

0.021

HOK

0.042

b. Bahan :
Paku Campur
Kayu Kelas II, papan pinggir

kg

0.025

Lbr

0.0063

c. Alat

Ls

1.000

75 / 87

Volume: Koef X
Vol. Satuan

35,000
50,000

0.97
1.94

20,000
30,000
-

1.16
0.29

Jumlah Harga/M'

VII
1

PEKERJAAN PLAFOND
Pek. Rangka Plafond
a. Upah :
Pekerja
Tukang Kayu

M2

###

HOK

0.016

HOK

0.032

b. Bahan :
Paku Campur
Kayu Kelas II, Uk. 5/5 cm

kg

0.020

M3

0.010

c. Alat

Ls

1.000

35,000
50,000

3.45
6.90

20,000
20,000
-

4.31
2.16

Jumlah Harga/M1

Pek. Plafond
a. Upah :
Pekerja
Tukang Kayu

M2

17

###

HOK

0.021

HOK

0.041

b. Bahan :
Paku Tripleks
Tripleks

kg

0.025

lbr

0.347

c. Alat

Ls

1.000

35,000
50,000

2.95
5.91

25,000
49,250
-

3.54
49.62

Jumlah Harga/M2

Pek. Lis Profil plafond


a. Upah :
Pekerja
Tukang Kayu

b. Bahan :
Paku Campur
Lis Profil
c. Alat

M'

###

HOK

0.027

HOK

0.027

kg

0.021

Ujng

0.250

Ls

1.000

35,000
50,000

5.04
5.04

20,000
9,000
-

4.03
47.00

Jumlah Harga/M'

VIII
1

PEKERJAAN FINISHING
Pengecatan Tembok&Plafond, 2 x
a. Upah :
Tukang Cat
b. Bahan :
Plamir tembok
Cat Tembok
Kertas pasir
c. Alat
Kuas Cat

M2

###

HOK

0.017

50,000

5.47

Kg

0.098

Kg

0.070

Lbr

0.098

7,000
10,000
6,000

31.93
22.81
31.93

0.042

11,000

13.68

Bh

Jumlah Harga/M2
319851923.xls

NO

PEKERJAAN

SAT.

Koeff.
Teknik

Harga
Satuan (Rp.)

M2

###

Pengecatan Kayu, 2x
a. Upah :
Tukang Cat
b. Bahan :
Cat dasar/Meni
Cat Kayu
Thinner
Kertas pasir
c. Alat
Kuas Cat

76 / 87

Volume: Koef X
Vol. Satuan

HOK

0.032

50,000

7.67

Ltr

0.032

Ltr

0.079

7.67
19.17
7.67
23.00
11.50

Ltr

0.032

Lbr

0.095

21,000
37,500
21,000
6,000

Bh

0.048

11,000

Jumlah Harga/M2

Pengecatan Atap Seng, 2x


a. Upah :
Tukang Cat
b. Bahan :
Cat dasar/Meni besi
Cat Besi
Thinner
Kertas pasir
c. Alat
Kuas Cat

M2

###

HOK

0.021

50,000

3.34

Ltr

0.028

Ltr

0.056

Ltr

0.021

21,000
21,000
21,000
6,000

4.45
8.91
3.34
-

11,000

6.68

Lbr
Bh

0.042

Jumlah Harga/M2

IX

PEKERJAAN MEBEULER,
PERLENGKAPAN & ALAT PERMAINAN
1 Alat Peraga
2 Meja & Kursi Guru
3 Meja siswa:Kursi siswa
4 Papan Sekat
5 Papan Tulis
6 Jungkitan
7 WasTafel 1 Set
8 Closset
9 Pipa PVC 4"
### Pipa GIP 1.5"
### Ember cor
### Bola Dunia
### Skop
### Cangkul

Ls

Ls
Psng
bh
Unit
Unit
Unit
Unit
Unit
Ujng
Ujng
Bh
Bh
bh
Bh

1.00
1.00
60.00
1.00
2.00
1.00
1.00
1.00
2.00
1.00
5.00
1.00
1.00

500,000
500,000
155,000
250,000
175,000
200,000
500,000
105,000
92,000
47,000
8,500
2,000,000
52,000
52,000

Jumlah Total

319851923.xls

500,000
500,000
9,300,000
250,000
350,000
200,000
500,000
105,000
184,000
47,000
42,500
52,000
52,000
12,082,500

RENCANA ANGGARAN BIAYA PRASARANA


Desa
Kecamat
Kabupat
Provinsi

No. RAB
Nama Kegiatan
Sub Kegiatan
Jenis Kegiatan
Jenis Penanganan
Ukuran / Volume

:
:
:
:

VOLUME
NO

URAIAN

TOTAL Dana 2
Rp.

A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55

BAHAN
Semen
155.64
Pasir Urug
64
Pasir Pasang
24
Kerikil
10
Batu Kali
23
Batu Bata
10,000
Bouplank Lata 5/5 cm
Papan Mall
11
Lisplank 2.5x25 cm
14.00
Kayu 8/12 Klas II
Kayu 6/12 Klas I Kosen
35
Kayu 6/12 Klas II Kuda-Kuda
23
Kayu 6/12 Klas II Konsul
4
Kayu 5/7 Klas II Kuda-Kuda
101
Kayu 5/5 Klas II Rgka Plafon
302
Profil SP3
30
Pintu Type P1 & P2&P3
5
Kunci Pintu
5
Engsel Pintu
5
Grendel Pintu
5
Jendela+Kaca
21
Engsel Jendela
21
Grendel Jendela
21
Penahan Jendela
21
Tripleks
50
Paku Tripleks
4
Seng Gelombang
116
Seng Pelat/ Bubungan
7
Paku Seng
5
Angker Bout dia. 10 mm
24
Paku Campur
23
Kaca 3 mm
21
Besi Dia. 10 mm Full P 12 mt
Besi Dia. 8 mm Full P 12 mt
55
Besi Dia. 6 mm Full P 12 mt
34
Bendrat
3
Closet Jongkok
1
Wastafel
1
Tegel Keramik
108
Plamur Tembok
32
Cat Tembok Komilex @ 5 Kg
23
Cat Kayu @ 1 Kg
7
Tinner
6
Kuas Cat
24
Meni Seng @ 1 Kg
Plamur Tembok
32
Kertas Pasir
40
Meja dan Kursi Guru
1
Meja Siswa+kursi siswa
60
Papan Sekat
1
Lemari Buku
1
Jungkitan
1
Papan Tulis
2
Pipa PVC dia. 4 "
1
Pipa Giv dia.1.5"
1

319851923.xls

Rp.

:
:
:
:
:
:

08
Sarana Prasarana
Prasarana Pendidikan
Pemb.Gedung TK
Pembangunan Baru
8 x12 Mtr

HARGA
Dana 1

SAT.

Rp.
155.64
64.00
25.00
10.00
26.00
9,951.00
12.00
14.00
35.00
23.00
4.00
101.00
302.00
30.20
5.00
5.00
5.00
5.00
21.00
21.00
21.00
21.00
49.60
3.54
116.00
7.00
4.75
24.00
23.11
21.00
55.00
34.00
2.95
1.00
1.00
108.12
32.00
22.81
7.00
6.00
24.00
32.00
40.00
1.00
60.00
1.00
1.00

###
2.00
1.00
1.00

#N/A
#N/A
#N/A
#N/A
#N/A
Bh
Ujg
lbr
lbr
Ujg
Ujg
Ujg
Ujg
Ujg
Ujg
Ujg
Bh
Bh
Bh
Bh
Bh
Psg
Bh
Bh
Bh
kg
Bh
lbr
Kg
Bh
Kg
bh
Ujg
Ujg
Ujg
kg
Bh
Set
dos
kg
Klg
ltr
Ltr
bh
M2
kg
lbr
Psg
bh
Unit
Bh
Bh
Unit
Ujg
Ujg

JUMLAH

SATUAN

Dana 2

Dana 1

TOTAL

Rp.

Rp.

Rp.

Rp.

85,000
100,000
100,000
100,000
100,000
850
15,000
20,000
30,000
54,000
43,200
43,200
21,000
15,000
9,000
505,000
76,000
16,000
6,000
105,000
11,000
6,000
11,000
50,000
20,000
52,000
17,000
20,000
7,000
105,000
132,500
75,000
47,500
22,000
105,000
500,000
50,000
7,000
10,000
33,000
15,000
11,000
21,000
7,000
6,000
500,000
155,000
250,000
500,000
200,000
175,000
92,000
47,000

200,000
-

13,229,400
6,428,458
2,400,460
954,767
2,328,006
8,499,700
223,000
420,000
1,890,000
993,500
172,500
2,121,000
4,530,000
271,800
2,525,000
380,000
80,000
30,000
2,205,000
231,000
126,000
231,000
2,480,000
70,800
6,032,000
119,000
95,000
168,000
2,205,000
4,125,000
1,615,000
64,900
105,000
500,000
5,406,000
224,000
228,100
231,000
90,000
264,000
224,000
240,000
500,000
9,300,000
250,000
500,000
350,000
92,000
47,000

13,229,400
6,428,458
2,400,460
954,767
2,328,006
8,499,700
223,000
420,000
1,890,000
993,500
172,500
2,121,000
4,530,000
271,800
2,525,000
380,000
80,000
30,000
2,205,000
231,000
126,000
231,000
2,480,000
70,800
6,032,000
119,000
95,000
168,000
2,205,000
4,125,000
1,615,000
64,900
105,000
500,000
5,406,000
224,000
228,100
231,000
90,000
264,000
224,000
240,000
500,000
9,300,000
250,000
500,000
200,000
350,000
92,000
47,000

Sub Total (1)


B.
1
2
3
4

ALAT
Pacul
Linggis
Skop

C.
1
2

UPAH
Pekerja
Tukang

5
5
5

5
5
5

#N/A
#N/A
#N/A

52,000
50,000
52,000

Sub Total (2)


192
153
Sub Total (3)
Sub Total (1+2+3)

192
153

#N/A
#N/A

30,000
50,000

200,000

85,796,391

85,996,391

260,000
250,000
260,000
-

260,000
250,000
260,000
-

770,000

770,000

5,762,400
7,656,000

5,762,400
7,656,000

13,418,400

13,418,400

970,000

99,214,791

100,184,791

Operasional 2 %
Operasional 3 %
Total (1+2+3)

Diketahui dan disetujui Oleh :

319851923.xls

Dibuat Oleh :

REKAPITULASI RENCANA ANGGARAN BIAYA


Propinsi

Kabupaten :
Kecamatan :

JAWA TIMUR
PAMEKASAN
PAMEKASAN

No.

JENIS KEGIATAN

1
I

2
PEK.PERSIAPAN

Kelurahan

35000

50000

Usulan

97,044,350
Sat

Jumlah HOK

Ls

II. PEK.TANAH

M3

1 Pek. Galian Tanah

M3

2 Pek.Timbunan Tanah

M3

3.9

3 Pek.Timb. Pasir

M3

57.86

III PEKERJAAN PASANGAN

M3

1 Pek. Pas.Batu kali

M3

16.55

2 Pek.Pas. Batu kosong

M3

3.58

3 Pek.Pas.Batu Bata

M3

4 Pek.Plesteran+Acian

M2

5 Pek. Lt. Keramik

M2

HARGA SATUAN

Kegiatan

Pekerja

Tukang

Bahan

Upah

Alat

Dana 1
( Rp. )

10

Volume

#REF!

165,000.0

JUMLAH HARGA SATUAN


Dana 2
( Rp. )
11=12-10
-

15.59

7.9

0.8

18.9

4,821,344.0

1 Pek. Beton bertulang Sp.1;2;3;

27,300.0

27,300.0

661,850.0

5,483,200.0

2 Pek. Beton Rabat Sp.1;3;5


V

PEK. KUSEN,PINTU PANIL

276,500.0

19.3

9.7

5,680,450.0

1,158,150.0

6,838,600.0

0.8

0.8

318,222.0

67,622.0

385,800.0

138.21

26.2

13.0

1,568,814.0

12,828,400.0

255.48

9.8

4.9

3,037,482.0

585,069.0

3,622,500.0

108.12

26.7

13.4

6,827,353.0

1,603,578.0

8,430,950.0

###

M3
M3

276,500.0

IV. PEK. BETON

165,000.0

2.97

16.7

3.7

7,675,619.0

771,459.0

8,447,050.0

7.44

10.1

5.1

2,805,390.0

608,398.0

3,413,750.0

M3

1 Kusen, Jendela & Ventilasi

M'

139.36

3.9

3.9

7,525,400.0

329,044.0

7,854,500.0

2 Pek. Pintu panil

bh

2.5

2.5

3,015,000.0

212,500.0

3,227,500.0

3 Pek.Jendela+Kaca

bh

21

4.9

4.9

2,793,000.0

420,000.0

3,213,000.0

6.0

18.0

1,258,500.0

1,110,000.0

2,368,500.0

10.0

19.9

2,051,760.0

1,344,600.0

3,396,350.0

VI. PEK. KUDA2 & ATAP

V.

M3

Pek. Kuda-kuda+Ikatan angin

bh

Pek. Gording & Bubungan

M'

371.84

Pek. Konsul

bh

1.2

2.4

246,720.0

162,000.0

408,700.0

Pek.Atap Seng

M2

160.3

4.5

8.9

6,109,211.0

601,125.0

6,710,350.0

Pek. Seng Bubungan

M'

14

1.0

1.0

125,000.0

85,000.0

210,000.0

Pek. Lisplank

M'

46.54

1.0

1.9

31,996.0

130,894.0

162,900.0

M3

Pek.Rangka Plafond

M2

483.74

7.7

15.5

647,000.0

1,044,887.0

1,691,850.0

Pek. Plafond

M2

142.96

3.0

5.9

2,552,013.0

398,752.0

2,950,750.0

PEK. PLAFOND

Pek.Lis Profil SP3

M'

120.8

3.2

3.2

323,571.0

275,036.0

VI. PEK. PENGECATAN

M2

Pek. Cat Tembok


Pek. Cat Kayu

M2

326.57

5.5

643,106.0

273,662.0

150,514.0

1,067,250.0

M2

84.73

2.7

391,352.0

134,485.0

44,380.0

570,250.0

156.8

3.3

467,133.0

163,333.0

71,867.0

11,992,500.0

96,342,050

Pek. Cat Seng


VII. PEK. MEBEULER, PERLENGKAPAN

M3

598,600.0
-

TOTAL

81,744,400

Operasional 2 %

#REF!

2,028,250

Operasional 3 %

#REF!

3,042,380

JUMLAH PER UNIT


C

JUMLAH TOTAL UNIT


DISETUJUI OLEH,

Drs. Ec. Faris Chozien Madani


Ketua Panitia

M3

101,412,700

7
DIPERIKSA OLEH,

DIBUAT OLEH,

Drs. KH. Mu'arif Thantowi, M.Si.


Ketua Yayasan

Salman Alfarisi

TULASI RENCANA ANGGARAN BIAYA


BUGIH
: Pemb. MADIN
JUMLAH HARGA SATUAN
Total
( Rp. )
12=7+8+9
165,000.0
276,500.0
27,300.0
5,483,200.0
6,838,600.0
385,800.0
12,828,400.0
3,622,500.0
8,430,950.0
8,447,050.0
3,413,750.0
7,854,500.0
3,227,500.0
3,213,000.0
2,368,500.0
3,396,350.0
408,700.0
6,710,350.0
210,000.0
162,900.0
1,691,850.0
2,950,750.0

598,600.0
1,067,250.0
570,250.0
702,300.0
11,992,500.0
97,044,350
2,028,250
3,042,380
102,115,000
714,805,001
DIBUAT OLEH,

Salman Alfarisi

JADWAL PELAKSANAAN
Provinsi
Kabupaten
Kecamatan
Kelurahan / Desa

NO

JENIS PEKERJAAN

PEK. PERSIAPAN

Jawa Timur
Pamekasan
Pamekasan
Bugih

Nama Kegiatan : Gedung MI


Volume : 9 x 7 Mtr
Lokasi :
Jangka Waktu pelaksanaan : 60 (enam puluh) hari Kalender

BOBOT
PEK.
(%)

BULAN
I
1

0.0018

0.001

II
3

II

PEK. TANAH

0.0030

0.003

III

PEK.PASANGAN

0.3508

0.117

0.117

0.117

IV

PEK. BETON

0.1296

0.043

0.043

0.043

PEK. KUSEN

0.1562

0.052

0.052

0.052

PEK. KUDA2 & ATAP

0.1448

VI.

VII. PEK. PLAFOND

0.0573

VIII PEK. PENGECATAN

0.0256

IX

PEK. MEBEULER, PERLENGKAPA

JUMLAH BOBOT PEKERJAAN


KEMAJUAN PEKERJAAN (%)

III
1

0.048

0.048

0.048

0.019

0.019
0.009

0.1310

0.019
0.009
0.066

100.0%

0.001

0.009
0.066

0.090

12.084

21.217

21.217

14.353

6.736

7.588

9.312

7.403

0.090

12.17

33.39

54.61

68.96

75.70

83.29

92.60

100.00

KUMULATIF KEMAJUAN (%)

Dibuat Oleh :
TPK Dutohe

Aris Makmur
Ketua

Nip.940 008 349

PNPM - Mandiri Perdesaan

Form.24.

Perbandingan

1 : 1.000

Jalan Kampung

Kecamatan
Gedung Utara

DE SA
..
JENIS PRASARANA

Tota
Total l Luas : 65
Ruan
g Bela M
jar : 7
unit
Ukura
n Unit
:9x
7M

..

Rumah Oemar Mochtar

LOKASI

JUDUL GAMBAR
PETA SITUASI
Dibuat Oleh :

Rumah
Tengah

Rumah Timur

Madrasah
Langgar
Wanita

Diperiksa Oleh :

Diketahui Oleh :
Kantor

Rencana
Ruang
Belajar

Rumah
Barat

Jalan

PROPINSI
Kab.

Asta

Barat

UTARA

Masjid
Trotoar

Jalan Kabupaten
Lembar . Dari .Lembar

PNPM - Mandiri Perdesaan

Form.24.

PNPM - Mandiri Perdesaan

Form.24.

PNPM - Mandiri Perdesaan

Form.24.

Anda mungkin juga menyukai