RANCANGAN ANGGARAN BIAYA JAMBAN TIPE 3:3:1 (persegi)

NO. ITEM Satuan Jml Harga Total Harga


1 Gorong-Gorng Buah 8 180,000 1,440,000
2 Paku Campur Kg 3 18,000 54,000
3 Kloset Keramik Unit 1 194,000 194,000
4 Pipa 1” Batang/Lonjor 1 35,000 35,000
5 Pipa 2” Batang/Lonjor 2 85,000 170,000
6 Piaa 4" Unit 1 150,000 150,000
7 L bow 4" Unit 2 12,000 24,000
8 L bow 2" Unit 5 8,000 40,000
9 Tongkat 10 x 10 x 1,5 M Batang 4 75,000 300,000
10 Bantal kup 8 x 8 x 3 M Batang 1 185,000 185,000
11 Gelegar 3 x 7 x 3 M Batang 3 55,000 165,000
12 Lem Pipa Tube 1 25,000 25,000
13 Besi cor Batang 4 45,000 180,000
14 Papan mal Keping 3 26,000 78,000
15 Pasir Kubik 0.5 100,000 50,000
16 Semen 50 Kg Zak 2 80,000 160,000
17 Sarana CTPS Unit 1 200,000 200,000
18 Biaya Tukang HOK 1 1,300,000 1,300,000
4,750,000
Jumlah 20 Paket 95.000.000
Biaya Operasional 5.000.000
JUMLAH TOTAL 100.000.000