A. PERALATAN
1. Sekop 1 buah @ 90.000 = 90.000
2. Kompor senawar 1 unit @ 250.000 = 250.000
3. Ember 1 buah @ 25.000 = 50.000
4. Gayung 1 buah @ 7.500 = 15.000
5. Regulator gas dan selang gas 1 set @ 205.000 = 205.000
6. Timbangan 1 buah @ 200.000 = 200.000
7. Botol kosong 10 biji @ 2.000 = 20.000
8. Sendok besar / centong 1 lusin @ 20.000 = 20.000
9. Spatula / sendok kecil stainless 1 lusin @ 17.500 = 17.500
10. Lampu Bunsen modifikasi 5 buah @ 5.000 = 25.000
11. Keramik 20 x 30 1 dus @ 80.000 = 80.000
12. Cincin paralon 1″ 1 Btg @ 30.000 = 30.000
13. Ayakan 1 x 1 m 1 unit @ 100.000 = 100.000
14. Kulikar/tungku 1 unit @ 120.000 = 120.000
15. Tabung gas 3 kg 1 buah @ 170.000 = 170.000
16. Drum modifikasi 1 unit @ 300.000 = 300.000
Total : 1.692.500
B. BAHAN-BAHAN
1. Serbuk kayu gergaji 5 krg @ 7.000 = 35.000
2. Dedak 40 Kg @ 6.000 = 240.000
3. Kapur dolomit 1 sak @ 85.000 = 85.000
4. Plastik PP 0,5 x 18 x 35 2 kg @ 55.000 = 110.000
5. Koran bekas 1 kg @ 8.000 = 8.000
6. Karet gelang 1 pak @ 17.000 = 17.000
7. Kapas 1 pak @ 7.000 = 7.000
8. Spritus 1 botol @ 35.000 = 35.000
9. Hand Sprayer 1 buah @ 10.000 = 10.000
10. Alkohol 70% 1 liter @ 60.000 = 60.000
11. Thermometer ruang 1 buah @ 50.000 = 50.000
12. Plastik tutup drum 2 meter @ 15.000 = 30.000
13. Karet ban 2 meter @ 3.000 = 6.000
14. Bibit jamur F-2 10 botol @ 20.000 = 200.000
15. Baglog siap Panen 10 Log @ 10.000 = 100.000
Total : 993.000
Catatan. Pak Rama nilai rupiah, perkiraan harga barang yang disampaikan oleh Pak
Budi Narasumber Pelatihan Jamur Tiram di Kab. Pulang Pisau, Prop.Kalteng,
untuk di kita nanti tentunya menyesuaikan.