REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : REHAB SARANA DAN PRASARANA SANITASI, CUCITANGAN, WHUDU, DAN MCK

SATKER : BALAI PRASARANA PERMUKIMAN WILAYAH PROVINSI JAWA BARAT

LOKASI :

KOTA :

TAHUN ANGGARAN : 2020

JUMLAH HARGA
NO URAIAN PEKERJAAN PEKERJAAN
( Rp )
(a) (b) (c)

A PEKERJAAN WC/KM
I PEKERJAAN PERSIAPAN Rp 12,190,656.25
II PEKERJAAN STRUKTUR Rp 34,426,538.62
III PEKERJAAN ARSITEKTUR Rp 89,711,511.75
IV PEKERJAAN MEP Rp 4,030,000.00
V LAIN - LAIN Rp 2,600,000.00

B PEKERJAAN IPAL
I PEKERJAAN PERSIAPAN Rp 775,952.40
II PEKERJAAN TANAAH Rp 2,160,412.76
III PEKERJAAN STRUKTUR Rp 27,028,656.08
IV PEKERJAAN PIPA SANITASI & ASSESORIES Rp 7,379,866.00

TOTAL Rp 180,303,593.85
PPN 10 % Rp 18,030,359.39
JUMLAH TOTAL Rp 198,333,953.24
DIBULATKAN Rp 198,333,000.00
Terbilang :
Seratus Sembilan Puluh Delapan Juta Tiga Ratus Tiga Puluh Tiga Ribu Rupiah
RENCANA ANGGARAN BIAYA (RAB)
UNIT MCK

KEGIATAN : REHAB SARANA DAN PRASARANA SANITASI, CUCITANGAN, WHUDU, DAN MCK
SATKER : BALAI PRASARANA PERMUKIMAN WILAYAH PROVINSI JAWA BARAT
LOKASI :
KOTA :
TAHUN ANGGARAN : 2020

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6

A PEKERJAAN WC/KM
I PEKERJAAN PERSIAPAN
1 Galian Tanah Pondasi 24.86 m3 Rp 69,575.00 Rp 1,729,808.44
2 Urugan Pasir Pondasi 1.66 m3 Rp 179,630.00 Rp 297,736.73
3 Pondasi Batu Kali 11.27 m3 Rp 861,988.00 Rp 9,715,466.75
4 Urugan Kembali 8.75 m3 Rp 51,150.00 Rp 447,644.34
Rp 12,190,656.25
II PEKERJAAN STRUKTUR
1 Sloof 15x20 cm 0.89 m3 Rp 5,197,489.00 Rp 4,646,555.17
2 Kolom 15x15 cm 0.86 m3 Rp 8,569,145.00 Rp 7,403,741.28
3 Ringbalk 15x15 cm 0.67 m3 Rp 6,753,860.00 Rp 4,528,463.13
4 Pasir Lantai t = 10 cm 3.60 m3 Rp 179,630.00 Rp 646,668.00
5 Rabat Beton Lantai t=8cm 2.88 m3 Rp 5,972,608.00 Rp 17,201,111.04
Rp 34,426,538.62
III PEKERJAAN ARSITEKTUR
1 Pasanga Dinding Bata 1/2 bata 1SP:2PP 29.80 m2 Rp 136,351.00 Rp 4,063,259.80
2 Pasanga Dinding Bata 1/2 bata 1SP:5PP 35.76 m2 Rp 124,365.00 Rp 4,447,292.40
3 Pasangan Roster 0.83 m2 Rp 31,250.00 Rp 25,781.25
4 Plester Dinding 131.12 m2 Rp 79,003.00 Rp 10,358,873.36
5 Acian 85.65 m2 Rp 35,888.00 Rp 3,073,878.98
6 Keramik Lantai 36.00 m2 Rp 226,958.00 Rp 8,170,488.00
7 Keramik Dinding 45.47 m2 Rp 427,873.00 Rp 19,454,529.56
8 Keramik Meja Wastafel 2.52 m2 Rp 226,958.00 Rp 571,934.16
9 Pengecatan 136.20 m2 Rp 35,291.00 Rp 4,806,722.43
10 Pintu Piber 5.00 bh Rp 490,930.00 Rp 2,454,650.00
11 Keran Air Toto 14.00 bh Rp 347,518.00 Rp 4,865,252.00
12 Kloset Jongkok Toto Ce6 5.00 Unit Rp 1,239,425.00 Rp 6,197,125.00
13 Meja Wastafel 0.36 m3 Rp 5,145,112.00 Rp 1,852,240.32
14 Rangka Atap Baja Ringan 51.40 m2 Rp 178,365.00 Rp 9,167,764.80
15 Penutup Atap Genteng Metal 51.40 m2 Rp 125,191.00 Rp 6,434,679.69
16 Kisi Kisi ( Louver) 5.23 m2 Rp 720,000.00 Rp 3,767,040.00
Rp 89,711,511.75
IV PEKERJAAN MEP
1 Lampu 8.00 titik Rp 66,000.00 Rp 528,000.00
2 Kabel 50.00 M Rp 10,000.00 Rp 500,000.00
2 Stop kontak 3.00 Unit Rp 55,000.00 Rp 165,000.00
3 Saklar 3.00 Unit Rp 55,000.00 Rp 165,000.00
3 Instalasi Pipa ( floor drain) 1.00 ls Rp 2,000,000.00 Rp 2,000,000.00
4 Grill Lantai 1.68 m2 Rp 400,000.00 Rp 672,000.00
Rp 4,030,000.00
V LAIN - LAIN
1 Prasasti 1 ls Rp 600,000.00 Rp 600,000.00
2 Pembersihan Area Bekas Pekerjaan 1 ls Rp 2,000,000.00 Rp 2,000,000.00
Rp 2,600,000.00
JUMLAH TOTAL II : Rp 142,958,706.61
RENCANA ANGGARAN BIAYA (RAB)
IPAL 10 KK

KEGIATAN : REHAB SARANA DAN PRASARANA SANITASI, CUCITANGAN, WHUDU, DAN MCK
SATKER : BALAI PRASARANA PERMUKIMAN WILAYAH PROVINSI JAWA BARAT
LOKASI :
KOTA :
TAHUN ANGGARAN : 2020

NO URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6

A IPAL 10 KK
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan Bouplank 11.40 M Rp 68,066.00 Rp 775,952.40
Rp 775,952.40
II PEKERJAAN TANAAH
1 Galian tanah untuk struktur Baffled Reactor 19.98 m3 Rp 85,635.00 Rp 1,710,987.30
3 Urugan pasir 5 cm 0.34 m3 Rp 179,630.00 Rp 61,074.20
4 Urugan kembali tanah bekas galian 7.59 m3 Rp 51,150.00 Rp 388,351.26
Rp 2,160,412.76
II PEKERJAAN STRUKTUR
1 Lantai kerja 10 cm camp.1 : 3 : 5 Setara K100 0.68 m3 Rp 854,145.00 Rp 580,818.60
2 Cor Plat lantai camp. 1pc : 2ps : 3kr Setara K175 0.68 m3 Rp 1,024,208.00 Rp 696,461.44
3 Besi Plat lantai Dia 10 111.82 kg Rp 13,341.90 Rp 1,491,920.91
4 Bekisting Plat lantai 1.14 m2 Rp 278,471.00 Rp 317,456.94
5 Cor Beton Kolom 15X15 camp 1pc : 2ps : 3kr Setara K175 0.30 m3 Rp 1,024,208.00 Rp 304,189.78
6 Besi Beton Kolom dia 10 55.15 kg Rp 13,341.90 Rp 735,859.15
7 Bekisting Beton Kolom 7.92 m2 Rp 239,971.00 Rp 1,900,570.32
8 Cor Beton Dinding IPAL camp 1pc : 2ps : 3kr Setara K 175 2.51 m3 Rp 1,024,208.00 Rp 2,568,713.66
9 Besi Beton Dinding IPAL Dia 10 412.43 kg Rp 13,341.90 Rp 5,502,555.34
10 Bekisting Beton Dinding IPAL 27.50 m2 Rp 243,546.00 Rp 6,697,515.00
11 Cor Beton Balok15X10 cm camp 1pc : 2ps : 3kr Setara K 175 0.19 m3 Rp 1,024,208.00 Rp 192,039.00
12 Besi Beton Balok 52.23 kg Rp 13,341.90 Rp 696,836.32
13 Bekisting Beton Balok 3.75 m2 Rp 243,601.00 Rp 913,503.75
14 Cor Plat Atas IPAL camp 1pc : 2ps : 3kr Setara K 175 1.02 m3 Rp 1,024,208.00 Rp 1,044,692.16
15 Besi Plat Atas IPAL 111.82 kg Rp 13,341.90 Rp 1,491,920.91
16 Bekisting Plat Atas IPAL 6.80 m2 Rp 278,471.00 Rp 1,893,602.80
Rp 27,028,656.08
III PEKERJAAN PIPA SANITASI & ASSESORIES
1 Pekerjaan Pasang pipa PVC Type AW Ø 4" 12.00 m Rp 78,857.00 Rp 946,284.00
2 Pekerjaan Pasang Elbow PVC Type AW 4" 2.00 bh Rp 78,700.00 Rp 157,400.00
3 Pekerjaan Pasang pipa PVC Type AW Ø 3" 4.00 m Rp 56,692.00 Rp 226,768.00
4 Pekerjaan Pasang Tee PVC Type AW 3" 4.00 bh Rp 66,300.00 Rp 265,200.00
5 Pekerjaan Pasang pipa PVC Type AW 2" assesories 2.00 m Rp 36,857.00 Rp 73,714.00
6 Pekerjaan Pasang Tee PVC 2" 1.00 bh Rp 54,000.00 Rp 54,000.00
7 Pekerjaan Pasang Elbow PVC 2" 2.00 bh Rp 54,000.00 Rp 108,000.00
8 Pekerjaan Pasang Media Bakteri (Botol Air Mineral) 1.28 m3 Rp 1,800,000.00 Rp 2,308,500.00
9 Pekerjaan Pasang Manhole Logam Cor Dia. 60 cm 3.00 bh Rp 1,080,000.00 Rp 3,240,000.00
Rp 7,379,866.00
JUMLAH TOTAL II : Rp 35,184,474.48
KEGIATAN
REHAB SARANA DAN PRASARANA
SANITASI, CUCITANGAN, WHUDU, DAN
MCK

PEKERJAAN

729 +3.50

100

LOKASI

10°
+2.40

22
+2.10

PESANTREN GELAR RT 04 / RW
04 DESA PEUTEUYCONDONG
KECAMATAN CIBEBER

210
TEMPAT CUCI TANGAN
+0.85
+0.50

SELASAR
+0.00 DISETUJUI OLEH
PPK WILAYAH 1
BALAI PRASARANA PERMUKIMAN WILAYAH
PROVINSI JAWA BARAT

TAMPAK DEPAN
SKALA 1 : 100

Erwin Firmansyah, ST.


NIP. 19801222008011006

DI BUAT OLEH
+3.50
PERENCANA
100
Plafon
+2.40
17°
22

123 +2.10

+0.85
SHOPDRAWING
180
+0.50

+0.00 PRASARANA SANITASI,


- 0.20 WHUDU, DAN MCK

- 0.80
-0.95

NAMA GABAR SKALA

POTONGAN C-C
SKALA 1 : 100 TAMPAK DEPAN 1 : 100
POTONGAN C-C

NO LEMBAR JUMLAH LEMBAR

20 15
KEGIATAN
REHAB SARANA DAN PRASARANA
SANITASI, CUCITANGAN, WHUDU, DAN
MCK

PEKERJAAN

B A
600 LOKASI
480
120 120 120 120 120

PESANTREN GELAR RT 04 / RW
04 DESA PEUTEUYCONDONG
KECAMATAN CIBEBER

160
45 96 45 96 45 96 45 60

C KM/WC KM/WC KM/WC KM/WC


C DISETUJUI OLEH
PPK WILAYAH 1
BALAI PRASARANA PERMUKIMAN WILAYAH
487
PROVINSI JAWA BARAT

220

600
D TEMPAT WHUDU D Erwin Firmansyah, ST.

50
NIP. 19801222008011006

TEMPAT CUCI TANGAN DI BUAT OLEH

50
..\..\..\Pictures\LOGO PU.jpg ..\..\..\Pictures\LOGO PU.jpg ..\..\..\Pictures\LOGO PU.jpg
PERENCANA

120
15 105 15 72 100 100 72 15

120 120 360

600

SHOPDRAWING
B A
PRASARANA SANITASI,
WHUDU, DAN MCK
DENAH MCK
SKALA 1 : 100

NAMA GABAR SKALA

DENAH MKC 1 : 100

NO LEMBAR JUMLAH LEMBAR

20 15