LOKASI : BANDUNG
TAHUN PEKERJAAN : ALL IN - 2021
B PEKERJAAN TANAH
1 PENGADAAN URUGAN TANAH MERAH TAMAN 114.3 M3 Rp 165,000 Rp 18,859,500
2 PENGADAAN URUGAN TANAH HITAM/HUMUS 72 M3 Rp 195,000 Rp 14,040,000
3 PENGOLAHAN KONTUR TANAH TAMAN 1 IS Rp 5,000,000 Rp 5,000,000
TOTAL Rp 37,899,500
C PEKERJAAN HARDSCAPE
1 PSG LANTAI BATU LEMPENG PEDESTRIAN 457 M2
2 PEK PSG KOLAM & WATER FAUNTAIN BETON 1 SET/UNIT
3 PSG LANTAI GRASSBLOCK 268 M2
4 PEK PSG RANGKA BESI LOVE PERGOLA
5 PEK PSG PERGOLA KAYU/BESI 4 UNIT
6 PEK PSG SPOT SELFIE PIGURA FRAME 2 UNIT
7 PSG KURSI BANGKU TAMAN BESI P:100CM 9 UNIT
PEK PENGADAAN BALON UDARA MINI + KERANJANG &
8 2 SET/UNIT
AKSESORIS
9 PEK PENGADAAN PAYUNG GANTUNG 2 SET/UNIT
D PEKERJAAN SOFTSCAPE
PEK RUMPUT GAJAH MINI pennisetum
1 497.7 m2 Rp 35,000 Rp 17,419,500
purpureumschamach
PEK RUMPUT KACANG - KACANGAN ISI 18 PHN = 3780
2 189 m2 Rp 45,000 Rp 8,505,000
PHN
Page 1 of 2
3 TANAM POHON KAMBOJA t: 4 M 6 bh Rp 350,000 Rp 2,100,000
4 TANAM POHON CEMARA KIPAS t:2-3M 38 bh Rp 500,000 Rp 19,000,000
5 TANAMPOHON CEMARA PUA PUA t : 1M 23 bh Rp 200,000 Rp 4,600,000
6 TANAM POHON KETAPANG t: 4M 4 bh Rp 350,000 Rp 1,400,000
7 TANAM POHON FLAMBOYAN t: 3M 4 bh Rp 350,000 Rp 1,400,000
8 TANAM BUNGA KUCAI LYLI ISI 100 PHN T : 15CM 67.5 m2 Rp 300,000 Rp 20,250,000
TANAM BUNGA MAWAR WARNA WARNI ISI 25 PHN T :
9 21.6 m2 Rp 250,000 Rp 5,400,000
25CM
10 TANAM BUNGA KRISAN ISI 20 PHN T : 25 CM 156.6 m2 Rp 400,000 Rp 62,640,000
16 TANAM RAMBAT LEE KWAN YEW ISI 14 PHN T : 35 CM 103.5 m Rp 70,000 Rp 7,245,000
Estimator,
Bandung 2021
Page 2 of 2