RENCANA ANGGARAN BIAYA (RAB)

Propinsi : Papua Barat No. RAB : 1


Kabupaten : Manokwari Selatan Program : DANA DESA
Kecamatan : Oransbari Jenis Kegiatan : Pekerjaan Bendung dan Sayap
Desa : Masabui I Ukuran/Dimensi : 1,5 x 2 x 0,6 m

VOLUME Harga Jumlah dari Jumlah dari Jumlah


NO URAIAN Dari Dari Satuan Satuan Swadaya PNPM Total
Total
Swadaya PNPM ( Rp. ) ( Rp ) ( Rp ) ( Rp. )
I. B A H A N
A PEKERJAAN BENDUNG DAN SAYAP( campuran 1 :2 :3) dan (spesi 1:3)
1 Kerikil 7 7 M3 250,000 - 1,750,000 1,750,000
2 Batu kali 3 3 M3 250,000 - 750,000 750,000
3 Semen 50 kg 59 59 Zak 79,000 - 4,661,000 4,661,000
4 Pasir cor 7 7 M3 250,000 - 1,750,000 1,750,000
5 Besi Ø 12mm - 12m 46 46 Btg 105,000 - 4,830,000 4,830,000
6 Besi Ø 10mm - 12m 6 6 Btg 92,000 - 552,000 552,000
7 Papan Mall Kls III Uk. 2/18-4m 2 2 m3 1,500,000 - 3,000,000 3,000,000
8 Paku 2,5" 3 3 kg 25,000 - 75,000 75,000
9 Pipa 4" 1 1 btg 240,000 - 240,000 240,000
10 Tutup Pipa 4" 1 1 bh 25,000 - 25,000 25,000
11 Kawat bendrat 2 2 kg 22,000 - 44,000 44,000
12 dolken 50 50 btg 5,000 - 250,000 250,000
Sub Total I.a - 17,927,000 17,927,000
II. A L A T ###
1 Cangkul 5 2 3 Bh 55,000 110,000 165,000 275,000
2 Kapak 3 2 1 Bh 55,000 110,000 55,000 165,000
3 Linggis 1 1 Bh 60,000 - 60,000 60,000
4 Pahat 3 1 2 Bh 45,000 45,000 90,000 135,000
5 Pakuel 2 2 Bh 30,000 - 60,000 60,000
6 Parang 4 2 2 Bh 55,000 110,000 110,000 220,000
7 Ember 3 3 Bh 15,000 - 45,000 45,000
8 Sekop 3 3 Bh 55,000 - 165,000 165,000
9 Penggali 3 3 bh 55,000 - 165,000 165,000
10 Palu 5 2 3 Bh 45,000 90,000 135,000 225,000
11 Gerobak Arco 2 2 Unit 360,000 - 720,000 720,000
12 Terval Plastik Uk. 8 x 6 m 1 1 Bh 240,000 - 240,000 240,000
13 Gergaji Besi 1 1 Bh 25,000 - 25,000 25,000
Sub Total II 465,000 2,035,000 2,500,000
III. U P A H
1 Tukang 24.00 - 24.00 HOK 65,000 - 1,560,000 1,560,000
2 Pekerja 47.00 - 47.00 HOK 50,000 - 2,350,000 2,350,000
Sub Total III - 3,910,000 3,910,000
IV. LAIN-LAIN
1 Papan Kegiatan 1 - 1 Bh 150,000 - 150,000 150,000
2 Papan informasi 1 1 Bh 100,000 - 100,000 100,000
2 Prasasti 1 1 Bh 500,000 - 500,000 500,000
Sub Total IV - 750,000 750,000
TOTAL BIAYA 465,000 24,622,000 25,087,000
PNPM-MP 24,622,000
Sumber dana
Swadaya Masyarakat -
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA (RAB)

Propinsi : Papua Barat No. RAB : 2


Kabupaten : Manokwari Selatan Program : DANA DESA
Kecamatan : Oransbari Jenis Kegiatan : Pekerjaan Bak Penguat Pembagi
Desa : Masabui I Ukuran/Dimensi : 2x2x2 m

VOLUME Harga Jumlah dari Jumlah dari Jumlah


NO URAIAN Dari Dari Satuan Satuan Swadaya PNPM Total
Total
Swadaya PNPM ( Rp. ) ( Rp ) ( Rp ) ( Rp. )
I. B A H A N
B PEKERJAAN BAK PENGUAT PEMBAGI. 4m x 5m x 2m = 2 Unit
1 Semen 50 kg 86.04 87.00 Zak 79,000 - 6,873,000 6,873,000
2 Pasir Cor 5.00 5.00 M3 250,000 - 1,250,000 1,250,000
3 Pasir urug 1.00 1.00 M3 117,000 - 117,000 117,000
4 batu pecah 1-2 8.00 8.00 M3 350,000 - 2,800,000 2,800,000
5 Batu Kali 3.03 3.03 M3 250,000 - 756,500 756,500
6 Pasir Pasang 4.00 4.00 m3 250,000 - 1,000,000 1,000,000
7 Besi Ø 12 258.00 258.00 btg 95,000 - 24,510,000 24,510,000
8 besi Ø 10 234.00 234.00 btg 85,000 - 19,890,000 19,890,000
9 Kawat bendrat 3.00 3.00 kg 22,000 - 66,000 66,000
10 Papan Kayu Klas III 2.00 2.00 m3 1,500,000 - 3,000,000 3,000,000
11 Balok Kayu Klas III 1.00 1.00 m3 1,500,000 - 1,500,000 1,500,000
12 Plywood 9 mm 23.00 23.00 Lbr 98,000 - 2,254,000 2,254,000
13 Minyak Bekisting 11.00 11.00 Ltr 10,000 - 110,000 110,000
14 Paku Biasa 27.00 27.00 Kg 25,000 - 675,000 675,000
15 Dolken 30.00 30.00 btg 5,000 - 150,000 150,000
16 Cat Dasar 20 kg 2.00 2.00 bh 550,000 - 1,100,000 1,100,000
17 Cat Biru 8.00 8.00 klg 45,000 - 360,000 360,000
18 Cat Silver Platon 2.00 2.00 klg 42,000 - 84,000 84,000
19 Cat Mani nipon 2.00 2.00 klg 45,000 - 90,000 90,000
20 Kuas Gambar 2.00 2.00 bh 10,000 - 20,000 20,000
21 Cat Hitam 2.00 2.00 klg 42,000 - 84,000 84,000
22 Cat Hijau 2.00 2.00 klg 42,000 - 84,000 84,000
23 Cat Kuning 2.00 2.00 klg 42,000 - 84,000 84,000
Sub Total I - 66,857,500 66,857,500
II. A L A T ###
1 Cangkul 3 3 Bh 55,000 - 165,000 165,000
2 Kapak 1 1 Bh 55,000 - 55,000 55,000
3 Linggis 1 1 Bh 60,000 - 60,000 60,000
4 Pahat 1 1 Bh 45,000 - 45,000 45,000
5 Pungki 2 2 Bh 30,000 - 60,000 60,000
6 Parang 2 2 Bh 55,000 - 110,000 110,000
7 Ember 3 3 Bh 15,000 - 45,000 45,000
8 Sekop 3 3 Bh 55,000 - 165,000 165,000
9 Penggali 3 3 bh 55,000 - 165,000 165,000
10 Palu 3 3 Bh 45,000 - 135,000 135,000
11 Gerobak Arco 2 2 Unit 360,000 - 720,000 720,000
12 Terval Plastik Uk. 8 x 6 m 1 1 Bh 240,000 - 240,000 240,000
13 Gergaji Besi 1 1 Bh 25,000 - 25,000 25,000
Sub Total II - 1,990,000 1,990,000
III. U P A H
1 Tukang 35.30 - 35.30 HOK 65,000 - 2,294,240 2,294,240
2 Pekerja 67.24 - 67.24 HOK 50,000 - 3,362,000 3,362,000
Sub Total III - 5,656,240 5,656,240
TOTAL BIAYA - 74,503,740 74,503,740
PNPM-MP 74,503,740
Sumber dana
Swadaya Masyarakat -

7.59188733344125
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA (RAB)

Propinsi : Kalimantan Barat No. RAB : 3


Kabupaten : Pontianak Program : PNPM MP
Kecamatan : Sadaniang Jenis Kegiatan : Keran T
Desa : Ansiap Ukuran/Dimensi : - Unit

VOLUME Harga Jumlah dari Jumlah dari Jumlah


NO URAIAN Dari Dari Satuan Satuan Swadaya PNPM Total
Total
Swadaya PNPM ( Rp. ) ( Rp ) ( Rp ) ( Rp. )
I. B A H A N
C PEKERJAAN KRAN "T" = - Unit
1 Cor Lantai Kran "T" Camp. 1:2:3
- Semen 50 kg - - - Zak 100,000 - - -
- Pasir Cor - - - M3 190,000 - - -
- Batu 1-2cm - - - M3 350,000 - - -
- Papan Mall - - - Keping 18,000 - - -
-paku 2,5" - - - kg 18,000 - - -
2 Pasir Urug Tebal 5cm
- Pasir - - - M3 190,000 - - -
3 Cor Kran "T" Uk. 15cm x 15cm x 80cm
- Semen 50 Kg - - - Zak 100,000 - - -
- Pasir - - - M3 190,000 - - -
- Batu 1-2cm - - - M3 350,000 - - -
- Papan Mall - - - Keping 18,000 - - -
- Cerucuk Ø 8/10 - 4 M (Utk Mall) 18.0 - 18.0 Btg 5,000 - 90,000 90,000
- Paku 3" - - - Kg 18,000 - - -
- Tee 1" ke 3/4" - - - Bh 25,000 - - -
- Tee 3/4" ke 1/2" - - - Bh 25,000 - - -
- Kran 1/2" - - - Bh 35,000 - - -
- Pipa 3/4" - - - Btg 30,000 - - -
- Pipa 1/2" - - - Btg 25,000 - - -
- Solatif Putih - - - Bh 15,000 - - -
- Sochet keran 18.0 18.0 bh 15,000 - 270,000 270,000
- L 3/4 - - bh 25,000 - - -
- Lem Paralon - - - klg 35,000 - - -
Sub Total I - 360,000 360,000
II. A L A T ###
1 Cangkul 3 3 Bh 55,000 - 165,000 165,000
2 Kapak 1 1 Bh 55,000 - 55,000 55,000
3 Linggis 1 1 Bh 60,000 - 60,000 60,000
4 Pahat 1 1 Bh 45,000 - 45,000 45,000
5 Pungki 2 2 Bh 30,000 - 60,000 60,000
6 Parang 2 2 Bh 55,000 - 110,000 110,000
7 Ember 3 3 Bh 15,000 - 45,000 45,000
8 Sekop 3 3 Bh 55,000 - 165,000 165,000
9 Penggali 3 3 bh 55,000 - 165,000 165,000
10 Palu 3 3 Bh 45,000 - 135,000 135,000
11 Gerobak Arco 1 1 Unit 360,000 - 360,000 360,000
12 Terval Plastik Uk. 8 x 6 m 1 1 Bh 240,000 - 240,000 240,000
13 Gergaji Besi 1 1 Bh 25,000 - 25,000 25,000
Sub Total II - 1,630,000 1,630,000
III. U P A H
1 Tukang - - - HOK 65,000 - - -
2 Pekerja - - - HOK 50,000 - - -
Sub Total III - - -
TOTAL BIAYA - 1,990,000 1,990,000
PNPM-MP 1,990,000
Sumber dana
Swadaya Masyarakat -

Catatan :
1 Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom volume dari swadaya
2 Nilai RAB didapat dari kolom Volume Dari Dana dikalikan dengan kolom harga satuan yang kemudian ditotalkan
3 Sumbangan dalam bentuk uang dimasukkan pada baris terbawah (sumber dana dari swadaya)
4 Swadaya dalam bentuk lahan dituliskan dalam format lain

Dibuat Oleh, Fasilitator Kecamatan


Disetujui Oleh, Ketua TPK Desa Ansiap

Markurius Wantoro Adidas Yoyok Prasetyo Nugroho, ST Ebba Hamjumadi, Amd


19620511 198503 1 009 FT-Kec F-Kec
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA (RAB)

Propinsi : Papua Barat No. RAB : 4


Kabupaten : Manokwari Selatan Program : DANA DESA
Kecamatan : Oransbari Jenis Kegiatan : Pipanisasi
Desa : Masabui I Ukuran/Dimensi : 700 m

VOLUME Harga Jumlah dari Jumlah dari Jumlah


NO URAIAN Dari Dari Satuan Satuan Swadaya PNPM Total
Total
Swadaya PNPM ( Rp. ) ( Rp ) ( Rp ) ( Rp. )
I. B A H A N
PNPM - Mandiri Perdesaan

D PEKERJAAN PEMASANGAN PIPA SEPANJANG 700 Meter


1 Paralon 4" - - - Btg 225,000 - - -
2 Pipa Hdpe 2" 5 - 5 Roll 225,000 - 1,125,000 1,125,000
3 Pipa Hdpe 1" 7 - 7 Roll 90,000 - 630,000 630,000
4 Pipa Hdpe 1/2" 8 8 Roll 50,000 - 400,000 400,000
5 Elbow 90º 2" 4 4 bh 120,000 - 480,000 480,000
6 Elbow 45º 2 2 bh 100,000 - 200,000 200,000
7 Reduser 2"- 1" 2 2 bh 110,000 - 220,000 220,000
8 Reduser 1"-1/2" 2 2 bh 30,000 - 60,000 60,000
9 Socket Coupling 2" 20 20 bh 160,000 - 3,200,000 3,200,000
10 Socket Coupling 1" 10 10 bh 55,000 - 550,000 550,000
11 Tee 2" 2 2 bh 300,000 - 600,000 600,000
12 Tee 1/2" 50 50 bh 35,000 - 1,750,000 1,750,000
13 Stop kran 2" 4 4 bh 45,000 - 180,000 180,000
14 Stop Kran 1/2' 45 45 bh 500,000 - 22,500,000 22,500,000
15 Lem Paralon - - - Kaleng 35,000 - - -
Sub Total I - 31,895,000 31,895,000
II. A L A T ###
1 Cangkul 10 10 Bh 55,000 - 550,000 550,000
2 Kapak 4 4 Bh 55,000 - 220,000 220,000
3 Linggis 3 3 Bh 60,000 - 180,000 180,000
4 Pahat 2 2 Bh 45,000 - 90,000 90,000
5 Pungki 10 10 Bh 30,000 - 300,000 300,000
6 Parang 3 3 Bh 55,000 - 165,000 165,000
7 Ember 7 7 Bh 15,000 - 105,000 105,000
8 Sekop 5 5 Bh 55,000 - 275,000 275,000
9 Penggali 10 10 bh 55,000 - 550,000 550,000
10 Palu 5 5 Bh 45,000 - 225,000 225,000
11 Gerobak Arco 1 1 Unit 360,000 - 360,000 360,000
12 Terval Plastik Uk. 8 x 6 m - - Bh 240,000 - - -
13 Gergaji Besi - - Bh 25,000 - - -
Sub Total II - 3,020,000 3,020,000
III. U P A H
1 Tukang 117.00 - 117.00 HOK 65,000 - 7,605,000 7,605,000
2 Pekerja 127.00 - 127.00 HOK 50,000 - 6,350,000 6,350,000
Sub Total III - 13,955,000 13,955,000
TOTAL BIAYA - 48,870,000 48,870,000
PNPM-MP 48,870,000
Sumber dana
Swadaya Masyarakat -
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA (RAB)

Propinsi : Kalimantan Barat No. RAB : 5


Kabupaten : Pontianak Program : PNPM MP
Kecamatan : Sadaniang Jenis Kegiatan : Bak FIBER
Desa : Ansiap Ukuran/Dimensi : 3,000 M3

VOLUME Harga Jumlah dari Jumlah dari Jumlah


NO URAIAN Dari Dari Satuan Satuan Swadaya PNPM Total
Total
Swadaya PNPM ( Rp. ) ( Rp ) ( Rp ) ( Rp. )
I. B A H A N
E PENAMPUNG BAK FIBER = 1 Unit
1 Batu pecah 1-2 1 1 m3 350,000 - 350,000 350,000
2 Batu pecah 10/15 1 1 m3 260,000 - 260,000 260,000
3 Semen 50 kg 5 5 zak 100,000 - 500,000 500,000
4 Pasir cor 2 2 m3 190,000 - 380,000 380,000
5 BAK Fiber Glass 3.0000 Ltr 1 1 bh 3,500,000 - 3,500,000 3,500,000
6 papan mall 1 1 kpg 18,000 - 18,000 18,000
7 Paku 1 1 kg 18,000 - 18,000 18,000
Sub Total I - 5,026,000 5,026,000
II. A L A T ###
1 Cangkul 3 3 Bh 55,000 - 165,000 165,000
2 Kapak 1 1 Bh 55,000 - 55,000 55,000
3 Linggis 1 1 Bh 60,000 - 60,000 60,000
4 Pahat 1 1 Bh 45,000 - 45,000 45,000
5 Pungki 2 2 Bh 30,000 - 60,000 60,000
6 Parang 2 2 Bh 55,000 - 110,000 110,000
7 Ember 3 3 Bh 15,000 - 45,000 45,000
8 Sekop 3 3 Bh 55,000 - 165,000 165,000
9 Penggali 3 3 bh 55,000 - 165,000 165,000
10 Palu 3 3 Bh 45,000 - 135,000 135,000
11 Gerobak Arco 1 1 Unit 360,000 - 360,000 360,000
12 Terval Plastik Uk. 8 x 6 m 1 1 Bh 240,000 - 240,000 240,000
13 Gergaji Besi 1 1 Bh 25,000 - 25,000 25,000
Sub Total II - 1,630,000 1,630,000
III. U P A H
1 Tukang 2.00 - 2.00 HOK 65,000 - 130,000 130,000
2 Pekerja 3.00 - 3.00 HOK 50,000 - 150,000 150,000
Sub Total III - 280,000 280,000
TOTAL BIAYA - 6,936,000 6,936,000
PNPM-MP 6,936,000
Sumber dana
Swadaya Masyarakat -

Catatan :
1 Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom volume dari swadaya
2 Nilai RAB didapat dari kolom Volume Dari Dana dikalikan dengan kolom harga satuan yang kemudian ditotalkan
3 Sumbangan dalam bentuk uang dimasukkan pada baris terbawah (sumber dana dari swadaya)
4 Swadaya dalam bentuk lahan dituliskan dalam format lain

Dibuat Oleh, Fasilitator Kecamatan


Disetujui Oleh, Ketua TPK Desa Ansiap

Markurius Wantoro Adidas Yoyok Prasetyo Nugroho, ST Ebba Hamjumadi, Amd


19620511 198503 1 009 FT-Kec F-Kec
PNPM - Mandiri Perdesaan

RENCANA ANGGARAN BIAYA (RAB)

Propinsi : Papua Barat No. RAB : 4


Kabupaten : Manokwari Selatan Program : DANA DESA
Kecamatan : Oransbari Jenis Kegiatan : Pipanisasi
Desa : Masabui I Ukuran/Dimensi : 700 m

VOLUME Harga Jumlah dari Jumlah dari Jumlah


NO URAIAN Dari Dari Satuan Satuan Swadaya PNPM Total
Total
Swadaya PNPM ( Rp. ) ( Rp ) ( Rp ) ( Rp. )
I. B A H A N
PNPM - Mandiri Perdesaan

D PEKERJAAN PEMASANGAN PIPA SEPANJANG 700 Meter


1 Paralon 4" - - - Btg 225,000 - - -
2 Pipa Hdpe 2" 5 - 5 Roll 5,000,000 - 25,000,000 25,000,000
3 Pipa Hdpe 1" 7 - 7 Roll 1,600,000 - 11,200,000 11,200,000
4 Pipa Hdpe 1/2" 8 8 Roll 900,000 - 7,200,000 7,200,000
5 Elbow 90º 2" 4 4 bh 15,000 - 60,000 60,000
6 Elbow 45º 2 2 bh 15,000 - 30,000 30,000
7 Reduser 2"- 1" 2 2 bh 15,000 - 30,000 30,000
8 Reduser 1"-1/2" 2 2 bh 15,000 - 30,000 30,000
9 Socket Coupling 2" 20 20 bh 15,000 - 300,000 300,000
10 Socket Coupling 1" 10 10 bh 15,000 - 150,000 150,000
11 Tee 2" 2 2 bh 40,000 - 80,000 80,000
12 Tee 1/2" 50 50 bh 25,000 - 1,250,000 1,250,000
13 Stop kran 2" 4 4 bh 450,000 - 1,800,000 1,800,000
14 Stop Kran 1/2' 45 45 bh 25,000 - 1,125,000 1,125,000
15 Tutup Pipa 4" - - - bh 35,000 - - -
Sub Total I - 48,255,000 48,255,000
B PEKERJAAN BAK PENAMPUNG 2m x 2m x 2m DAN INTAKE. = 1 Unit
1 Semen 50 kg 86.0 - 86 Zak 79,000 - 6,797,286 6,873,000
2 Pasir Cor 5.0 - 5 M3 250,000 - 1,250,000 1,250,000
3 Pasir urug 1.0 - 1 M3 117,000 - 117,000 117,000
4 Kerikil 8.0 - 8 M3 350,000 - 2,800,000 2,800,000
5 Batu Kali 2.0 - 2 M3 250,000 - 500,000 756,500
6 Pasir Pasang 4.0 - 4 m3 250,000 - 1,000,000 1,000,000
7 Besi Ø 12 258.0 - 258 btg 95,000 - 24,510,000 24,510,000
8 besi Ø 10 234.0 - 234 btg 85,000 - 19,890,000 19,890,000
9 Kawat bendrat 3.0 - 3 kg 22,000 - 66,000 66,000
10 Papan Kayu Klas III 2.0 - 2 m3 1,500,000 - 3,000,000 3,000,000
11 Balok Kayu Klas III 1.0 - 1 m3 1,500,000 - 1,500,000 1,500,000
12 Plywood 9 mm 23.0 - 23 Lbr 98,000 - 2,254,000 2,254,000
13 Minyak Bekisting 11.0 - 11 Ltr 10,000 - 110,000 110,000
14 Paku Biasa 27.0 - 27 Kg 25,000 - 675,000 675,000
15 Dolken 30.0 - 30 btg 30,000 - 900,000 150,000
16 Cat Dasar 20 kg 2.0 - 2 bh 550,000 - 1,100,000 1,100,000
17 Cat Biru 8.0 - 8 klg 45,000 - 360,000 360,000
19 Cat Mani nipon 2.0 - 2 klg 45,000 - 90,000 90,000
20 Kuas Gambar 2.0 - 2 bh 10,000 - 20,000 20,000
21 Cat Hitam 2.0 - 2 klg 42,000 - 84,000 84,000
Sub Total II - 67,023,286 66,605,500
II. A L A T
1 Cangkul 10 10 Bh 60,000 - 600,000 600,000
2 Kapak 4 4 Bh 120,000 - 480,000 480,000
3 Linggis 3 3 Bh 60,000 - 180,000 180,000
4 Pakuel 10 10 Bh 120,000 - 1,200,000 1,200,000
5 Parang 3 3 Bh 250,000 - 750,000 750,000
6 Ember 7 7 Bh 15,000 - 105,000 105,000
7 Sekop 5 5 Bh 150,000 - 750,000 750,000
8 Palu 5 5 Bh 85,000 - 425,000 425,000
9 Gerobak Arco 4 4 Unit 750,000 - 3,000,000 3,000,000
10 Gergaji Besi 4 4 Bh 25,000 - 100,000 100,000
Sub Total III - 7,590,000 7,590,000
III. U P A H
1 Tukang 117.00 - 117.00 HOK 120,000 - 14,040,000 14,040,000
2 Pekerja 127.00 - 127.00 HOK 150,000 - 19,050,000 19,050,000
Sub Total III - 33,090,000 33,090,000
TOTAL BIAYA - 88,935,000 88,935,000
Dana desa 88,935,000
Sumber dana
Swadaya Masyarakat -
37.20694889526
REKAPITULASI ANGGARAN BIAYA PRASARANA

Propinsi : Kalimantan Barat Kecamatan : Sadaniang


Kabupaten : Pontianak Desa : Ansiap

Pekerjaan Bendung dan Pekerjaan Bak Penguat


Kegiatan Kegiatan Kegiatan Keran T Kegiatan Pipanisasi Kegiatan Bak FIBER
Sayap Pembagi
No Uraian Ukuran 1,5 x 2 x 0,6 m Ukuran 2x2x2 m Ukuran 0 Unit Ukuran 700 m Ukuran 3,000 M3 JUMLAH TOTAL Bobot %
Jumlah 1 Jumlah 1 Jumlah 0 Jumlah 1 Jumlah 1
Bobot % Bobot % Bobot % Bobot % Bobot %
No. RAB 1 No. RAB 2 No. RAB 3 No. RAB 4 No. RAB 5
PNPM-MP SWADAYA PNPM-MP SWADAYA PNPM-MP SWADAYA PNPM-MP SWADAYA PNPM-MP SWADAYA PNPM-MP SWADAYA
I BAHAN 17,927,000 - 73 66,857,500 - 90 360,000 - 18 31,895,000 - 65 5,026,000 - 72 122,065,500 - 74
II PERALATAN 2,035,000 465,000 8 1,990,000 - 3 1,630,000 - 82 3,020,000 - 6 1,630,000 - 24 10,305,000 465,000 6
III UPAH 3,910,000 - 16 5,656,240 - 8 - - - 13,955,000 - 29 280,000 - 4 23,801,240 - 14
IV LAIN - LAIN 750,000 - 3 - - - - 750,000 - 0
Jumlah 24,622,000 465,000 100 74,503,740 - 100 1,990,000 - 100 48,870,000 - 100 6,936,000 - 100 156,921,740 465,000 95
V Operasional UPK 2 % 3,304,000 - 2
VI Operasional TPK 3 % 4,955,000 - 3
Jumlah Total 24,622,000 - 100 74,503,740 - 100 1,990,000 - 100 48,870,000 - 100 6,936,000 - 100 165,180,740 465,000 100
Jumlah Biaya Upah 3,910,000 16 5,656,240 8 - - 13,955,000 29 280,000 4 23,801,240 - 14
Jumlah HOK Konstruksi 71 HOK 103 HOK - HOK 244 HOK 5 HOK 423 - HOK

Ansiap, 28 Desember 2011


Dibuat Oleh
Disetujui Oleh, Fasilitator Kecamatan TPK Desa Ansiap
5282900
7924300

Markurius Wantoro Yoyok Prasetyo Nugroho, ST Ebba Hamjumadi, Amd Adidas


19620511 198503 1 009 FT FK Ketua
PNPM Mandiri - Perdesaan

LEMBAR : 1
Kabupaten : PONTIANAK
Kecamatan : SADANIANG
Desa : ANSIAP
Ukuran TOTAL 1,5 x 2 x 0,6 Untuk 1 M3 beton dibutuhkan 6,0 zak (50 kg/zak)
A. Volume bendung dan sayap pasir 0,539 M3, batu pecah 0,796 M3
Bendung Mercu Dinding + sayap 1 m
Tinggi bendung 1.5 m Tinggi mercu 1.2 m Tinggi 1.5 m³ 2 sisi
lebar bendung 2 m lebar mercu 1 m panjang 3 m³
tebal 0.6 m tebal atas 0.4 m tebal 0.3 m³
tebal bawah 1 m
volume 1.8 m³ volume 0.84 m³ Volume 2.7 m³
volume total 5.34 m³
Analisa K.725.a.i
Beton campuran (1 :2 :3)
1. semen = 5.34 x 6.7200 = 35.8848 ~ 36 zak
2. Pasir = 5.34 x 0.5400 = 2.8836 ~ 3 m3
3. Batu pecah 1-2 = 5.34 x 0.810 = 4.3254 ~ 5 m3
4. Tukang = 5.34 x 3.2350 = 17.2749 ~ 18 HOK
5. Pekerja = 5.34 x 5.6500 = 30.171 ~ 31 HOK
6.Papan Mall Kls III = 5.34 x 0.2700 = 1.4418 ~ 2 m3

7. Dolken = 50 btg
8. Pipa 4" = 1 btg
9. tutup pipa 4" = 1 bh
10. paku = 3 kg
Tulangan bendung
kebutuhan panjang jumlah Panjang besi jumlah
Tulangan pokok m btg m
Pot. A 6 27 12 13.5
Pot. B 5 6 12 2.5
Tulangan bagi
Pot C 10.3 20 12 17.166666667
Pot D 1.4 4 12 0.4666666667
Pot E 7.8 4 12 2.6
Jumlah x koef 1,1 39.856666667
Kebutuhan besi Ø12-12 40

Tulangan dinding + sayap


Besi Tulangan Pokok Ø 12-12m Jarak pasang 15cm ( Vertikal) 5.72 6 btg
Besi Tulangan Bagi Ø 10 mm-12m Jarak Pasang 15 cm ( horizontal)
- Kebutuhan 4 m/ 20 cm=33 Bh; 1Bh = 5,5 m 15.125 15 btg 5.72 6 btg
10. Kawat bendrat 2 kg

Lantai Bendung
Panjang 3.80 m
Lebar Bawah 3.00 m
tebal cor beton 0.20 m
tebal pondasi batu 10/15 0.15 m
Volume Lantai cor 2.28 m³
volume pondasi batu 10/15 1.71 m³
Kabupaten : PONTIANAK
Kecamatan : SADANIANG
Desa : ANSIAP

Kebutuhan besi dinding


Tulangan Vertikal Ø 12 = 167.333 168 btg
tulangan Horizontal Ø 10 = 164.000 164 btg
Kebutuhan besi atas + penutup
Tulangan Vertikal Ø 12 = 10.00 10 btg
tulangan Horizontal Ø 10 = 10.00 10 btg
5.Papan Mall Kls III =

Cerucuk = 30 btg

Cat Dasar 20 kg = 2 bh
Cat Biru = 8 bh
Cat Silver Platon = 2 bh
Cat Mani nipon = 2 bh
Kuas 2" = 2 bh
Cat Hitam = 2 bh
Cat Hijau = 2 bh
Cat Kuning = 2 bh
Take Jenis Prasarana : PIPANISASI
Of Lokasi : Masabui I
Sheet Volume : 700 M
lapisan Lantai beton
Analisa K.725.a.i Beton campuran (1 :2 :3)
1. Semen = 2.28 x 6 = 13.68 ~ 14 zak
2. Pasir = 2.28 x 0.539 = 1.22892 ~ 2 m
3. Batu pecah 1-2 = 2.28 x 0.796 = 1.81488 ~ 2 m
4. Tukang = 2.28 / 6 x 2 = 0.76 ~ 1 HOK
5. Pekerja = 2.28 / 6 x 12 = 4.56 ~ 5 HOK
lapisan Lantai Pondasi Pasangan Batu kali
analisa K.810.a
1. semen = 1.71 / 5 x 15.2 = 5.1984 ~ 6 zak
2.Pasir = 1.71 / 5 x 1.2 = 0.4104 ~ 1 m
3. Batu Kali = 1.71 / 5 x 6 = 2.052 ~ 3 m
4. Tukang = 1.71 / 5 x 4 = 1.368 ~ 2 HOK
5. Pekerja = 1.71 / 5 x 12 = 4.104 ~ 5 HOK

Plesteran
Analisa BOW G.48 Tebal plesteran 1 cm
Luas permukaan sayap dan bendung = 15 m²
Luas total = 15
1. semen = 15 x 0.142 = 2.13 ~ 3 zak
2.pasir = 15 x 0.011 = 0.165 ~ 1 m
3.tukang = 15 x 0.15 = 2.25 ~ 3 HOK
4.pekerja = 15 x 0.4 = 6 ~ 6 HOK

C. Bak Pembagi/penguat 2 Unit


Lebar Bak = 2 m 8 Tinggi Pipa Pelimpah = 1.8 m
Panjang Bak = 2 m Tinggi Pipa Input = 1.8 m
Tinggi Bak = 2 m Tinggi Pipa Ke Penduduk = 0.2 m
ketebalan lantai atas = 0.15 m Tutup Bak Ukuran = 0.5 m
ketebalan dinding = 0.2 m
ketebalan cor alas = 0.2 m
Ketebalan pondasi alas = 0.6 m
ketebalan pasir alas = 0.1 m
1. volume alas pondasi Bak
Volume= p x l x t 0.8 m³ volume pondasi bak batu pasang
2. volume pasir alas analisa K.810.a
Volume= p x l x t 0.4 1 m³ volume panjang x lebar x tinggi 0.3 2.2 m³
3.Volume dinding 4 sisi semen 2.2 x 3.26 = 7.04 zak
Volume= p x l x t 3.2 m³ pasir 2.2 x 0.52 = 1.12 m³
3.volume tutup bak Batu kali 2.2 x 1.1 = 2.38 m³
Volume= p x l x t 0.025 m³ tukang 2.2 x 0.6 = 1.30 HOK
Volume total bak 8.850 m³ pekerja 2.2 x 1.5 = 3.24 HOK
analisa k.725.a.1
Kayu kelas III = 8.85 x 0.25 = 2.2125 ~ 3 M3
Paku Biasa = 8.85 x 3.00 = 26.55 ~ 27 Kg
Minyak bekisting = 8.85 x 1.20 = 10.62 ~ 11 Lt
Besi beton (polos/ulir) = 8.85 x 210.00 = 1858.5 ~ 1859 Kg 0.89 2,089
Kawat beton = 8.85 x 3.00 = 26.55 ~ 27 Kg 174
Semen portland = 8.85 x 336.00 = 59.472 ~ 60 Zak
Pasir Beton = 8.85 x 0.54 = 4.779 ~ 5 m3
Kerikil = 8.85 x 0.81 = 7.1685 ~ 8 m3
Kayu kelas II balok = 8.85 x 0.11 = 0.92925 ~ 1 m3
Plywood 9 mm = 8.85 x 2.50 = 22.125 ~ 23 Lbr
Dolken kayu Ø 8-10/400 cm = 8.85 x 14.00 = 123.9 ~ 124 Bh
4. Tukang = 8.85 x 3.24 = 28.62975 ~ 29 HOK
5. Pekerja = 8.85 x 5.65 = 50.0025 ~ 51 HOK

Plesteran Bak
Analisa BOW G.48 Tebal plesteran 1 cm
luas total = panjang x tinggi x 4 sisi = 32 m²
1. semen = 32 x 0.142 = 4.544 ~ 5 zak
2.pasir = 32 x 0.011 = 0.352 ~ 1 m³
3.tukang = 32 x 0.15 = 4.8 ~ 5 HOK
4.pekerja = 32 x 0.4 = 12.8 ~ 13 HOK
Take Jenis Prasarana : PIPANISASI
Of Lokasi : Masabui I
Sheet Volume : 500 M

E. PEKERJAAN PEMASANGAN PIPA PANJANG 700 METER


Galian Tanah (30cm x 40cm x 700 m) 84 m³
analisa K.110
Pekerja = 84 M³ / 54 x 36 = 56 HOK
Paralon 4" = 0 m 0 ~ 0 Btg
Pipa Hdpe 2" = 500 m 5 ~ 5 Roll
Pipa Hdpe 1" = 700 m 7 ~ 7 Roll
Pipa Hdpe 1/2" = 750 m 7.5 ~ 8 Roll
Lem Paralon = 0 Kaleng
Elbow 90º 2" = 4 bh
Elbow 45º = 2 bh
Reduser 2"- 1" = 2 bh Upah
Reduser 1"-1/2" = 2 bh pemasangan pipa Tukang Pekerja
Socket Coupling 2" = 20 bh 4'' Analisa sni 18-20 panjang x koef 0.00 0.00
Socket Coupling 1" = 10 bh 3'' Analisa sni 18-20 panjang x koef 30.00 18.00
Tee 2" = 2 bh 2'' Analisa sni 17-20 panjang x koef 42.00 25.20
Tee 1/2" = 50 bh 1'' Analisa sni 16-20 panjang x koef 45.00 27.00
Stop kran 2" = 4 bh Jumlah 117.00 70.20
Stop Kran 1/2' = 45 bh HOK 117.00 71.00

F. Bak penampung 1 unit 3,000 M3


1. fiber 3 m ³ = 1 unit
2.pondasi dudukan fiber
diameter = 1.2 m
ketebalan = 0.7 m
luas teras = 2 m
volume pondasi =𝜋𝑟^2x t = 3,14 x0,6x0,6x0,7 x 1 = 0.791 m3

analisa K.810.a
=πr^2x t
semen = 0.79128 / 5 x 15.2 = 2.405491 ~ 3.0 Zak
Pasir = 0.79128 / 5 x 1.2 = 0.189907 ~ 1.0 M3
Batu pecah 10/15 = 0.79128 / 5 x 6 = 0.949536 ~ 1.0 M3
Tukang = 0.79128 / 5 x 4 = 0.633024 ~ 1 HOK
Pekerja = 0.79128 / 5 x 12 = 1.899072 ~ 2 HOK

3.cor lantai teras bak penampung = luas total teras - luas pondasi fiber = (((2 x 2 )-( 3,14 x 0,6 x 0,6))x0,1) 1 0.28696 m3
Analisa K.720.a.i
- Semen = 0.28696 M³ x 33 / 6 = 1.57828 Zak ~ 2.0 Zak
- Pasir = 0.28696 M³ x 3.28 / 6 = 0.156871 M³ ~ 1.0 m3
- Batu Kerikil Uk. 1-2cm = 0.28696 M³ x 4.84 / 6 = 0.231481 M³ ~ 1.0 m3
- Papan Mall Kls III = luas penampang (0,1 x 2 x 2 x 1 bh) = 0.4 m²
luas penampang papan (0,18 x 4 ) 0.72 m²
kebutuhan papan mall 0.4 / 0.72 = 0.5555556 ~ 1 kpg
- Pekerja = 0.28696 M³ x 12 / 6 = 0.57392 1 HOK
- Tukang = 0.28696 M³ x 1 / 6 = 0.047827 1 HOK
PNPM - MP
PROPINSI KAL - BAR
Pipa untuk pendistribusian
KAB. PONTIANAK
Bak Intake
KEC. SADANIANG
Saringan untuk bak Intake
DESA

ANSIAP

1,5 M B JENIS PRASARANA

PIPANISASI

LOKASI

DUSUN ANSIAP
3M
Dibuat Oleh :

FT TPK
A A

Yoyok PN, ST Adidas


1,5 M Diperiksa Oleh :
B 0,3 M
0,3 M FTKAB

Effendy Tambunan, ST
Diketahui Oleh :
PjOK

DENAH BENDUNGAN DUSUN PENTEK DESA PENTEK MARKURIUS WANTORO

SKALA 1 : 100
Lembar …. Dari ….Lembar
PNPM - MP
PROPINSI KAL - BAR

KAB. PONTIANAK

KEC. SADANIANG

DESA
0,3 M

Tulangan Besi Bagi Ø 8mm - 12m Jarak 15cm ANSIAP

JENIS PRASARANA
Tulangan Besi Pokok Ø 12mm - 12m Jarak 20cm

PIPANISASI
0,8 M Cor Beton Bertulang Campuran 1 : 2 : 3

1,2 M LOKASI

Pipa Penyaluran 4"


DUSUN ANSIAP
Pipa Pembuang Kotoran 6"
0,3 M
Tutup Pipa JUDUL GAMBAR
Pembuang Kotoran 6"
0,1 M
POTONGAN A - A

0,3 M
Dibuat Oleh :
Pasangan Batu kosong Uk. 10/15cm FT TPK

0,2 M 0,6 M 2M

2,8 M Yoyok PN, ST Adidas

Diperiksa Oleh :

FTKAB

POTONGAN A - A Effendy Tambunan, ST

SKALA 1 : 20 Diketahui Oleh :

PjOK

MARKURIUS WANTORO
Lembar …. Dari ….Lembar
PNPM - MP
PROPINSI KAL - BAR

KAB. PONTIANAK

KEC. SADANIANG

DESA

Sayap Bendung Panjang 2 m


Pipa Saluran 4" ANSIAP
Pipa Pelimpah Kotoran 6"
JENIS PRASARANA

PIPANISASI

1,2 m
0,3 m LOKASI
0,1 m
DUSUN ANSIAP

2m 3m 2m JUDUL GAMBAR

POTONGAN B - B

Dibuat Oleh :

POTONGAN B - B FT TPK

SKALA 1 : 50

Yoyok PN, ST Adidas

Diperiksa Oleh :

FTKAB

Effendy Tambunan, ST
Diketahui Oleh :

PjOK

MARKURIUS WANTORO
Lembar …. Dari ….Lembar
DANA DESA
PROPINSI PAPUA BARAT

KAB. MANSEL

KEC.ORANSBARI

DESA
Teras Bak Keliling Lebar 50 cm, Tebal 10 cm
MASABUI I
Bak Penampung Ukuran 3m x 3m x 2m
Tutup Bak Penampung JENIS PRASARANA

A Ukuran 0,5m x 0,5m, Tebal 10cm


PIPANISASI
0,5 m 1m
0,2 m LOKASI

B B MASABUI I

JUDUL GAMBAR
2m Sekat Dinding Bak Pelimpah
Tinggi 1,5m, Tebal 20cm DENAH BAK PENAMPUNG

Dibuat Oleh :

0,2 m
0,5 m 0,2 m 0,2 m 0,2 m

A
Diperiksa Oleh :
0,5 m 2m 0,5 m
FTKAB

DENAH BAK PENAMPUNG Effendy Tambunan, ST

SKALA 1 : 50 Diketahui Oleh :


Lembar …. Dari ….Lembar
DANA DESA
PROPINSI PAPUA BARAT

KAB. MANSEL

KEC.ORANSBARI
Tutup Bak Penampung
Ukuran 50cm x 50cm, Tebal 10cm DESA

Pipa Keluar Hasil Bak Pelimpah


Ukuran 2" Sebanyak 2 Buah MASABUI I

JENIS PRASARANA

PIPANISASI

1,3 m Bak Penampung Ukuran 2m x 2m x 2m LOKASI


Sekat Dinding Bak Pelimpah
Tinggi 0,7m, Tebal 0,2m
MASABUI I
Cor Lantai Bak Campuran 1 : 2 : 3
0,7 m
Teras Bak Keliling Lebar 0,5m, Tebal 0,1m JUDUL GAMBAR

0,1 m
DENAH BAK PENAMPUNG
0,6 m Pondasi Batu Kali
0,1 m Urugan Pasir Pondasi Bak Penampung Tebal 10cm Dibuat Oleh :

0,5 m 2m 0,5 m

Diperiksa Oleh :

FTKAB

POTONGAN A - A Effendy Tambunan, ST

SKALA 1 : 50 Diketahui Oleh :


Lembar …. Dari ….Lembar
DANA DESA
PROPINSI PAPUA BARAT

KAB. MANSEL

KEC.ORANSBARI

Sekat Dinding Bak Pelimpah


Tinggi 0,7m, Tebal 0,2m DESA
Tutup Bak Penampung
Ukuran 50cm x 50cm, Tebal 10cm MASABUI I

JENIS PRASARANA

PIPANISASI

LOKASI

Pipa Masuk Air Ukuran 2" MASABUI I

1,5 m Bak Penampung Ukuran 2m x 2m x 2m


JUDUL GAMBAR
0,2 m Pipa Keluar Hasil Bak Pelimpah
Pipa Keluar Ukuran 2" Sebanyak 2 Buah
0,5 m DENAH BAK PENAMPUNG
ke Keran "T" Uk. 2" 0,4 m Pipa Pembuang Kotoran
dari Bak Pelimpah Ukuran 2"
Dibuat Oleh :

0,5 m 2m 0,5 m

Diperiksa Oleh :

FTKAB

POTONGAN B - B Effendy Tambunan, ST

SKALA 1 : 50 Diketahui Oleh :


Lembar …. Dari ….Lembar
Saluran Air Buangan Keliling PNPM - MP
Lebar 0,2m, Tinggi 0,2m, Tebal 5cm PROPINSI KAL - BAR
Lantai Kran "T"
Uk. 2m x 1,5m, Tebal 10cm KAB. PONTIANAK

Balok Cor Kran "T" KEC. SADANIANG


A Uk. 15cm x 15cm, Tinggi 80cm
Pipa Kran Dua Arah Ukuran 1/2" DESA
0,2m
B B
ANSIAP

1,5m JENIS PRASARANA


10cm

70cm PIPANISASI
0,2m
20cm LOKASI
A
0,5m
DUSUN ANSIAP
0,2m 2m 0,2m 20cm 2m 20cm
JUDUL GAMBAR

DENAH KRAN "T", POT. A - A, DAN


POT. B - B

DENAH KRAN "T" POTONGAN B - B Dibuat Oleh :

SKALA 1 : 50 SKALA 1 : 50 FT TPK

Balok Cor Kran "T"


Uk. 15cm x 15cm, Tinggi 80cm Yoyok PN, ST Adidas

Pipa Kran Dua Arah Uk. 1/2" Diperiksa Oleh :

80cm Lantai Cor Kran "T" Uk. 2m x 1,5m, Tebal 10cm FTKAB
Urugan Pasir Tebal 5cm
20cm Saluran Air Buangan Keliling
Lebar 20cm, Tinggi 20cm, Tebal 5cm Effendy Tambunan, ST
Diketahui Oleh :
20cm 1,5m 20cm
PjOK

POTONGAN A - A
SKALA 1 : 50 MARKURIUS WANTORO
Lembar …. Dari ….Lembar
2
2mm

PROVINSI
KALIMANTAN BARAT
KABUPATEN
fiber 2000 lt PONTIANAK
KECAMATAN
SADANIANG
DESA
ANSIAP
fiber
fiber 2000
2000 lt
lt JENIS PRASARANA
= BAK FIBER 3.000 LITER
+
( LOKASI

+0,15 DUSUN ANSIAP
+0,15
� plesteran JUDUL GAMBAR
( + 70 plesteran TAMPAK SAMPING DAN ATAS
teras
� + 70 teras
� Dibuat Oleh :
0,10
0,10
) 0,0 0,10 4 Fasilitator Kecamatan TPK
0,0 0,10
0 4mm
batu
batu 10/15
10/15 m
m 0
�- 40
�- 40 TAMPAK ATAS
^ (Yoyok Prasetyo Nugroho, ST) ( JARINUS)
2
)
/ 0,10 0.10 Diperiksa Oleh :
0,10 0.10
2 FASTEKAB
!
+ TAMPAK SAMPING

Effendi Tambunan ST
Diketahui Oleh :
PjOK

Markurius Wantoro
NIP 19620511 198503 1 009
Lembar…..Dari…..Lembar