HARGA
NO U RAIAN SATUAN SATUAN
(Rp.)
IRHAM, ST.
Direktur
TERIAL / LISTRIK
KETERANGAN
HATULISTIWA
ANALISA SATUAN PEKERJAAN
4 1 m2 Pasangan Batu Bata 1/2 Batu 1 : 5 (Sumber Analisa PUPR No. 28/PRT/M/2016)
Batu Bata 70.0000 bh 900.00 63,000.00
Semen 0.1936 Zak 58,500.00 11,325.60
Pasir Pasangan 0.0450 m3 140,000.00 6,300.00
Kepala Tukang 0.0100 Oh 135,000.00
Tukang Batu 0.1000 Oh 90,000.00
Pekerja 0.3000 Oh 72,000.00
Mandor 0.0150 Oh 76,500.00
80,625.60
Over Head + Profit 15% (Lampiran Perpres 70/2012 Pasal 66 Ayat 8)
Jumlah Harga Satuan Pekerjaan
7 1m3 Membuat beton tumbuk 1 : 3 :5 Setara dengan fc' = 1,8 s.d 3,7 (B0: K-40 s.d. K-60) / (Sumber Analisa PUPR No. 28/PRT/M/2016)
Pasir Beton 0.5220 m3 140,000.00 73,080.00
Kerikil 0.8620 m3 270,000.00 232,740.00
Semen 4.0000 Zak 58,500.00 234,000.00
Kepala Tukang 0.0220 Oh 135,000.00
Tukang Batu 0.2200 Oh 90,000.00
Pekerja 1.3200 Oh 72,000.00
Mandor 0.0220 Oh 76,500.00
539,820.00
Over Head + Profit 15% (Lampiran Perpres 70/2012 Pasal 66 Ayat 8)
Jumlah Harga Satuan Pekerjaan
8 1m3 Membuat beton tumbuk 1 : 2 :3 Beton Mutu Sedang fc' 20 MPa atau K-250 / (Sumber Analisa PUPR No. 28/PRT/M/2016)
Pasir Beton 0.6920 m3 140,000.00 96,880.00
Kerikil 1.0390 m3 270,000.00 280,530.00
Semen 7.6800 Zak 58,500.00 449,280.00
Air 215.0000 Liter 100.00 21,500.00
Kepala Tukang 0.0280 Oh 135,000.00
Tukang Batu 0.2750 Oh 90,000.00
Pekerja 1.6500 Oh 72,000.00
Mandor 0.1650 Oh 76,500.00
848,190.00
Over Head + Profit 15% (Lampiran Perpres 70/2012 Pasal 66 Ayat 8)
Jumlah Harga Satuan Pekerjaan
9 1 m2 Pasangan Lantai Keramik 20x20 (Sumber Analisa PUPR No. 28/PRT/M/2016)
Tegel keramik 20 x 20 1.1000 Dos 64,800.00 71,280.00
Semen 0.2080 Zak 58,500.00 12,168.00
Semen Warna 1.6200 Kg 27,500.00 44,550.00
Pasir Pasangan 0.0450 m3 140,000.00 6,300.00
Kepala Tukang 0.0350 Oh 135,000.00
Tukang Batu 0.3500 Oh 90,000.00
Pekerja 0.6200 Oh 72,000.00
Mandor 0.0300 Oh 76,500.00
134,298.00
Over Head + Profit 15% (Lampiran Perpres 70/2012 Pasal 66 Ayat 8)
Jumlah Harga Satuan Pekerjaan
A B C D E F G = (C x E)
13 1 M2 Pengecatan Dinding Tembok Baru (1 lapis plamir, 1 lapis cat dasar 2 lapis) (Sumber Analisa PUPR No. 28/PRT/M/2016)
Cat penutup
Plamir tembok 0.1000 Kg 56,000.00 5,600.00
Cat dasar Alkali / Sealer 0.1000 Kg 58,000.00 5,800.00
Cat penutup 2 x 0.2600 Kg 65,000.00 16,900.00
Kertas Pasir 0.5000 Lbr. 18,000.00 9,000.00
Tukang 0.0630 Oh 90,000.00
Cat penutup 2 x (Cat Interior Setara Jotun/Nippon Pain) 0.0063 Oh 135,000.00
Pekerja 0.0200 Oh 72,000.00
Mandor 0.0025 Oh 76,500.00
37,300.00
Over Head + Profit 15% (Lampiran Perpres 70/2012 Pasal 66 Ayat 8)
14 1 m1 Pasang Knsteen (Sumber Analisa PUPR No. 28/PRT/M/2016)
Kansteen Batako Pres 1.6600 Buah 1,850.00 3,071.00
Semen 0.1200 Zak 58,500.00 7,020.00
Pasir Pasangan 0.0080 m3 140,000.00 1,120.00
Kepala Tukang 0.0200 Oh 135,000.00
Tukang Batu 0.2000 Oh 90,000.00
Pekerja 0.1500 Oh 72,000.00
Mandor 0.0100 Oh 76,500.00
11,211.00
Over Head + Profit 15% (Lampiran Perpres 70/2012 Pasal 66 Ayat 8)
Jumlah Harga Satuan Pekerjaan
15 1 m1 Pasang Kuku Tegel (Sumber Analisa PUPR No. 28/PRT/M/2016)
Kuku Tegel 10.1000 Buah 700.00 7,070.00
Semen 0.0120 Zak 58,500.00 702.00
Pekerja 0.1500 Oh 72,000.00
7,772.00
Over Head + Profit 15% (Lampiran Perpres 70/2012 Pasal 66 Ayat 8)
Jumlah Harga Satuan Pekerjaan
JUMLAH HARGA JUMLAH TOTAL
UPAH HARGA
(Rp) (Rp)
H = (C x F) I = (G + H)
3,600.00
765.00
4,365.00 4,365.00
70/2012 Pasal 66 Ayat 8) 654.75
5,019.75
40,536.00
4,306.95
44,842.95 44,842.95
70/2012 Pasal 66 Ayat 8) 6,726.44
51,569.39
28,800.00
3,060.00
31,860.00 164,460.00
70/2012 Pasal 66 Ayat 8) 24,669.00
189,129.00
H = (C x F) I = (G + H)
1,350.00
9,000.00
21,600.00
1,147.50
33,097.50 113,723.10
70/2012 Pasal 66 Ayat 8) 17,058.47
130,781.57
2,025.00
13,500.00
14,400.00
765.00
30,690.00 45,452.08
70/2012 Pasal 66 Ayat 8) 6,817.81
52,269.89
1,350.00
9,000.00
14,400.00
765.00
25,515.00 29,317.50
70/2012 Pasal 66 Ayat 8) 4,397.63
33,715.13
H = (C x F) I = (G + H)
2,970.00
19,800.00
95,040.00
1,683.00
119,493.00 659,313.00
70/2012 Pasal 66 Ayat 8) 98,896.95
758,209.95
3,780.00
24,750.00
118,800.00
12,622.50
159,952.50 1,008,142.50
70/2012 Pasal 66 Ayat 8) 151,221.38
1,159,363.88
4,725.00
31,500.00
44,640.00
2,295.00
83,160.00 217,458.00
70/2012 Pasal 66 Ayat 8) 32,618.70
250,076.70
H = (C x F) I = (G + H)
1,755.00
11,700.00
19,440.00
1,032.75
33,927.75 151,346.95
70/2012 Pasal 66 Ayat 8) 22,702.04
174,048.99
1,620.00
10,800.00
18,000.00
994.50
31,414.50 172,050.50
70/2012 Pasal 66 Ayat 8) 25,807.58
197,858.08
1,620.00
10,800.00
18,000.00
994.50
31,414.50 189,430.50
70/2012 Pasal 66 Ayat 8) 28,414.58
217,845.08
H = (C x F) I = (G + H)
5,670.00
850.50
1,440.00
191.25
8,151.75 45,451.75
70/2012 Pasal 66 Ayat 8) 6,817.76
2,700.00
18,000.00
10,800.00
765.00
32,265.00 43,476.00
70/2012 Pasal 66 Ayat 8) 6,521.40
49,997.40
10,800.00
10,800.00 18,572.00
70/2012 Pasal 66 Ayat 8) 2,785.80
21,357.80
I PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi 1.000 Ls Rp. 350,000.00 Rp.
2 Pekerjaan Pembongkaran Tegel Lama 1.000 Ls Rp. 3,000,000.00 Rp.
Rp.
II PEKERJAAN TANAH DAN PASIR
1 Urugan Pasir Bawah Lantai Keramik 31.933 M3 Rp. 189,129.00 Rp.
2 Pengadaan Tanah Taman 3.170 M3 Rp. 180,000.00 Rp.
Rp.
III PEK. PAS. BATU, DINDING DAN PLESTERAN
1 Pasangan Dinding Bata 18.036 M' Rp. 130,781.57 Rp.
Keterangan
Pemasangan pada bagian atas kolam
ditinggikan dari permukaan awal ± 15 cm
2 Plesteran Dinding Biasa 1 : 5 52.989 M² Rp. 52,269.89 Rp.
Keterangan
Plesteran pada dinding kolam dan bagian atas
sebelah samping tegel motif batu alam
3 Acian Dinding 1 PC : 7 Kapur 42.119 M² Rp. 33,715.13 Rp.
Keterangan
Acian dikerjakan sebelum pemsangan tegel dinding
kolam
4 Cor Beton 1 : 2 : 5 Tebal = 12 cm 23.335 M3 Rp. 1,159,363.88 Rp.
Keterangan
Pengecoran kedap air bagian dasar kolam sebelum
pemasangan tegel lantai motif catur ± 12 cn
5 Cor Rabat Beton 1 : 3 : 5 Tebal = 5 cm 9.723 M3 Rp. 758,209.95 Rp.
Keterangan
Pengecoran sebelum pemasangan tegel lantai
motif catur ± 5 cn
6 Pek. Lantai Keramik 40/40 194.461 M² Rp. 197,858.08 Rp.
Keterangan
Pemasangan tegel lantai kolam motif catur 40/40
VOLUME / HARGA SATUAN JUMLAH HAR
NO. URAIAN PEKERJAAN
SATUAN (Rp) (Rp)
IV PEKERJAAN LAIN-LAIN
1 Pembuatan Gazebo Besi Hollow 1.000 Unit Rp. 7,500,000.00 Rp.
2 Pemasangan Tutup Penguras Kolam 1.000 Buah Rp. 150,000.00 Rp.
3 Perbaikan Lisplank 1.000 Ls Rp. 200,000.00 Rp.
4 Pengadaan Buis Beton 6.000 Buah Rp. 200,000.00 Rp.
5 Pengadaan Tanaman Areal Kolam
- Tanaman Pohon Bintaro 4.000 Phn Rp. 600,000.00 Rp.
- Tanaman Pohon Tabe Puya 2.000 Phn Rp. 600,000.00 Rp.
- Tanaman Merambat Lee Kwan Yew 30.000 Buah Rp. 150,000.00 Rp.
5 Dokumentasi Proyek 1.000 Ls Rp. 250,000.00 Rp.
6 Pembersihan Akhir 1.000 Ls Rp. 2,000,000.00 Rp.
Rp.
JUMLAH HARGA
(Rp)
350,000.00
3,000,000.00
3,350,000.00
6,039,475.27
570,600.00
6,610,075.27
2,358,776.31
2,769,729.31
27,054,127.02
7,372,113.25
38,475,679.12
JUMLAH HARGA
(Rp)
10,532,980.53
1,564,566.23
7,183,001.92
3,290,631.18
18,908,952.51
1,417,000.00
1,443,252.64
9,520,419.97
10,732,461.84
142,623,691.83
JUMLAH HARGA
(Rp)
7,500,000.00
150,000.00
200,000.00
1,200,000.00
2,400,000.00
1,200,000.00
4,500,000.00
250,000.00
2,000,000.00
19,400,000.00
REKAPITULASI BIAYA
Satuan Kerja : Dinas Kebudayaan dan Pariwisata Kabupaten Sigi
Pekerjaan : Rehabilitasi Kolam Pemandian Air Panas Bora
Lokasi : Ds. Bora - Kabupaten Sigi
Tahun Anggaran : 2017
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
JUMLAH Rp.
PPN 10% Rp.
JUMLAH REAL COST Rp.
PEMBULATAN HARGA Rp.
Terbilang :
Seratus Delapan Puluh Sembilan Juta Seratus Delapan Puluh Dua Ribu Ru
Palu, 03 Oktober 2017
Penyedia Jasa
CV. LUNETTA KAHATULISTIWA
IRHAM, ST.
Direktur
AYA
Sigi
JUMLAH HARGA
(Rp)
3,350,000.00
6,610,075.27
142,623,691.83
19,400,000.00
171,983,767.10
17,198,376.71
189,182,143.81
189,182,000.00
TA KAHATULISTIWA