Anda di halaman 1dari 97

RENCANA ANGGARAN BIAYA

PEMBANGUNAN PONDOK PESANTREN

NO NAMA PEKERJAAN 1. MASJID 2. KELAS 3. ASRAMA PUTRI 4. ASRAMA 2

I PEKERJAAN PERSIAPAN 61,810,000 9,150,000 9,500,000 8,935,000


II PEKERJAAN TANAH DAN GALIAN 2,513,000 4,546,000 6,581,000 4,967,000
III PEKERJAAN PONDASI BATU KALI 9,900,000 15,300,000 22,500,000 17,400,000
IV PEKERJAAN BETON 118,000,000 176,290,000 277,200,000 206,437,500
V PEKERJAAN DINDING 31,900,000 68,175,000 104,450,000 74,780,500
VI PEKERJAAN PLAFON 9,375,000 17,250,000 62,250,000 25,650,000
VII PEKERJAAN CAT 5,687,500 11,875,000 23,250,000 14,025,000
VIII PEKERJAAN PENUTUP LANTAI 56,382,000 55,745,000 98,607,500 63,380,000
IX PEKERJAAN ATAP 86,850,000 54,130,000 105,615,000 77,870,000
X PEKERJAAN PINTU DAN JENDELA ALUMINIUM 40,511,500 84,844,100 111,138,350 74,501,400
XI PEKERJAAN LISTRIK 0 0 0 0
XII PEKERJAAN PENANGKAL PETIR ELEKTRIK 0 0 0 0
XIII TELEPHONE DAN CABLE DATA 337,500 4,525,000 7,900,000 6,550,000
XIV PEKERJAAN TATA UDARA 4,500,000 8,250,000 8,250,000 12,000,000
XV PEKERJAAN AIR BERSIH DAN SANITASI
A. Saluran Air Bersih 12,315,200 12,315,200 15,575,400 13,567,700
B. Saluran Tertutup Halaman 8,800,000 6,750,000 11,325,000 6,480,000
C. Septick Tank dan Peresapan 7,750,000 7,750,000 7,750,000 7,750,000
XVI PEKERJAAN TOILET 15,000,000 10,000,000 45,000,000 45,000,000
XVII PEKERJAAN RAILING TANGGA DAN BALKON 0 10,500,000 5,250,000 5,250,000
471,631,700 557,395,300 922,142,250 664,544,100
TOTAL PEKERJAAN SIPIL DAN ARSITEKTUR 2,615,713,350

XVIII PEKERJAAN LISTRIK / PENANGKAL PETIR ELEKTRIK


Pekejaan Listrik 42,582,500
Pekerjaan Penangkal Petir 17,625,500
XIX PEKERJAAN BANGUNAN PENDUKUNG
A. R.Makan dan Dapur 92,500,000
B. Pos Jaga 18,000,000
C. Bangsal Sepeda 26,250,000
D. Pagar Keliling 71,250,000
E. Perkerasan Halaman Luar dan Parkir 64,500,000
NO NAMA PEKERJAAN 1. MASJID 2. KELAS 3. ASRAMA PUTRI 4. ASRAMA 2

F. Pekerjaan Taman 9,750,000

TOTAL PEKERJAAN I - XIX 2,958,171,350


JASA KONSTRUKSI 10% 295,817,135
JASA PENGAWASAN DAN PENGENDALIAN 3% 88,745,141
GRAND TOTAL 3,342,733,626

NOTES :

A Pra Konstruksi
1. Jasa Perencanaan Lengkap 5-7% dari Global Anggaran
2. Test Kuat Tanah untuk perhitungan Struktur Rp. 750,000 / Titik
3. Jasa Perhitungan Struktur Lengkap Rp. 3,500/M2 luas Bangunan

B Konstruksi/Pelaksanaan
- Jasa Pemborong 10% dari RAB Direct Cost

C Pengawasan/Pengendalian
- Jasa Pengawasan dan Pengendalian 3% dari Biaya Konstruksi
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
BANGUNAN MASJID
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

A BANGUNAN MASJID

I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 196.00 5,000 980,000
2 Bowplank M1 56.00 30,000 1,680,000
3 Penentuan titik Pondasi dengan Theodolit Ls 1.00 600,000 600,000
4 Air Kerja masa konstruksi Ls 1.00 3,500,000 3,500,000
5 Listrik Kerja masa konstruksi Bln 12.00 500,000 6,000,000
6 Kantor Pengawas dan Kontraktor (6x9)M2 M2 54.00 500,000 27,000,000
7 Bedeng Pekerja (6x9)M2 M2 54.00 350,000 18,900,000
8 WC Pekerja (3x3)M2 M2 9.00 350,000 3,150,000

61,810,000
II PEKERJAAN TANAH DAN GALIAN
1 Galian Footplate M3 31.00 18,000 558,000
2 Galian Pondasi Batu Kali M3 43.00 35,000 1,505,000
3 Urug kembali bekas galian M3 30.00 15,000 450,000

2,513,000
III PEKERJAAN PONDASI BATU KALI
1 Urug pasir Bawah Pondasi Batu Kali M3 5.00 90,000 450,000
2 Urug Pasir Bawah Pondasi Foot Plate M3 5.00 90,000 450,000

Page 3 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
BANGUNAN MASJID
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

3 Pasangan Pondasi Batu Kali M3 30.00 300,000 9,000,000

9,900,000
IV PEKERJAAN BETON
1 Beton Footplate M3 8.00 2,000,000 16,000,000
2 Beton Kolom M3 15.00 3,750,000 56,250,000
3 Beton Sloof dan Kuda-kuda M3 15.00 2,750,000 41,250,000
4 Kolom Praktis M3 1.00 2,250,000 2,250,000
5 Ringbalk M3 1.00 2,250,000 2,250,000

118,000,000
V PEKERJAAN DINDING
1 Pasang Dinding Hebel Bata Ringan 10 cm M2 130.00 135,000 17,550,000
2 Plester Aci Dinding Hebel M2 260.00 35,000 9,100,000
3 Plester Beton M2 75.00 35,000 2,625,000
4 Sponengan M1 350.00 7,500 2,625,000

31,900,000
VI PEKERJAAN PLAFON
1 Pas. Plafon, Gypsum 9 MM ex Jaya Boar/Knauf/Elephant M2 125.00 75,000 9,375,000
rangka besi Hollow Galvanish 20/40, siap cat

9,375,000

Page 4 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
BANGUNAN MASJID
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

VII PEKERJAAN CAT


1 Cat Dinding ex Catylac M2 330.00 12,500 4,125,000
2 Cat Plafon ex Catylac M2 125.00 12,500 1,562,500

5,687,500
VIII PEKERJAAN PENUTUP LANTAI
1 Pas Keramik Lantai M2 125.00 125,000 15,625,000
2 Pas Keramik Lantai Kamar Mandi M2 17.00 125,000 2,125,000
3 Pas Keramik Dinding M2 210.00 125,000 26,250,000
4 Pas Keramik Tangga Masuk M2 36.00 125,000 4,500,000
5 Pemadatan Urugan Tanah dalam bangunan M2 142.00 7,500 1,065,000
6 Hamparan pasir t = 5 cm M2 142.00 3,500 497,000
7 Floor lantai kerja pasangan keramik M2 142.00 35,000 4,970,000
8 Step Nosing Tangga Masuk M1 18.00 75,000 1,350,000

56,382,000
IX PEKERJAAN ATAP
1 Rangka Atap Baja Ringan termasuk reng, dudukan lisplang M2 270.00 135,000 36,450,000
dan pengaku keliling pada kuda-kuda di ring balk
2 Penutup Atap Genteng Metal ex Sakura Roof setara M2 270.00 120,000 32,400,000
3 Nok Genteng Metal ex Sakura Roof setara M1 50.00 120,000 6,000,000
4 Aluminium foil Ex UNOfoil dg Anyaman Wiremesh M2 270.00 25,000 6,750,000
5 Lisplang Kalsiplang/GRC uk 10cm dan 20 cm terpasang M1 60.00 60,000 3,600,000

Page 5 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
BANGUNAN MASJID
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

6 Asesoris Pemasangan Genteng Metal Lot 1.00 750,000 750,000


7 Pengecatan Lisplang M2 60.00 15,000 900,000

86,850,000
X PEKERJAAN PINTU DAN JENDELA
1 Kusen Aluminium Dan Pintu Kaca (Periksa Detail Lampiran) Lot 1.00 40,511,500 40,511,500

40,511,500
XI PEKERJAAN LISTRIK
1 Periksa Di Lembar Pekerjaan Listrik dan Penangkal Petir Lot 0

0
XII PEKERJAAN PENANGKAL PETIR ELEKTRIK
1 Periksa Di Lembar Pekerjaan Listrik dan Penangkal Petir Lot 0
0
XIII TELEPHONE DAN CABLE DATA
1 Instalasi Kabel Telephone Titik 1.00 145,000 145,000
2 Unit Outlet telephone Bh 1.00 42,500 42,500
3 Unit Pesawat Telephone Bh 1.00 150,000 150,000

337,500
XIV PEKERJAAN TATA UDARA
1 Instalasi dan Unit Ex Haust Fan dan Ceiling Fan terpasang Unit 6.00 750,000 4,500,000

Page 6 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
BANGUNAN MASJID
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

4,500,000
XV PEKERJAAN AIR BERSIH DAN SANITASI
A Saluran Air Bersih
1 Instalasi Pipa dia. 4" AW M1 10.00 72,610 726,100
2 Instalasi Pipa dia. 3" AW M1 10.00 56,410 564,100
3 Instalasi Pipa dia. 2" AW M1 10.00 44,160 441,600
4 Instalasi Pipa dia. 1.5" AW distribusi sumur ke tangki M1 10.00 27,590 275,900
5 Instalasi Pipa dia. 1", 3/4". 1/2" AW ke titik Kran, Closet, dll Ls 1.00 1,247,500 1,247,500
6 Asesoris Penyambungan Tee, Sock, Knee dll Ls 1.00 1,500,000 1,500,000
7 Kran-kran Luar Bh 6.00 85,000 510,000
8 Pompa Distribusi dari Sumur ke Tangki Air Unit 1.00 4,500,000 4,500,000
9 Pompa Tendang distribusi dari Tangki ke Toilet Unit 1.00 650,000 650,000
10 Tangki Air Fibre kapasitas 1,000 lt Bh 1.00 1,450,000 1,450,000
11 Asesoris Instalasi Pompa dan Tangki Air Ls 1.00 450,000 450,000

12,315,200
B Saluran Tertutup Halaman
1 Saluran tertutup Bus Beton dia. 30 cm M1 40.00 145,000 5,800,000
2 Bak Kontrol untuk Saluran Tertutup Bh 10.00 300,000 3,000,000

8,800,000
C Septick Tank dan Peresapan

Page 7 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
BANGUNAN MASJID
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

1 Sumur Resapan Air Hujan, bus beton dia. 80 cm dalam 2M Titik 6.00 750,000 4,500,000
2 Sumur Resapan KM, bus beton dia. 80 cm dalam 3M Titik 1.00 1,500,000 1,500,000
3 Septick Tank beton bertulang 1,5 x 2,5 M dalam 2 M Unit 1.00 1,750,000 1,750,000

7,750,000

XVI PEKERJAAN TEMPAT WUDHU DAN TOILET


1 Instalasi Asesoris Lengkap 2 Toilet 2 KM Ls 1.00 15,000,000 15,000,000

15,000,000

471,631,700 471,631,700
Jasa Pemborong 10% 47,163,170 47,163,170
Total Pekerjaan Konstruksi 518,794,870 518,794,870

Page 8 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
KELAS
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

B BANGUNAN KELAS

I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 120.00 5,000 600,000
2 Bowplank M1 65.00 30,000 1,950,000
3 Penentuan titik Pondasi dengan Theodolit Ls 1.00 600,000 600,000
4 Air Kerja masa konstruksi Ls 0.00 3,500,000 0
5 Listrik Kerja masa konstruksi Bln 12.00 500,000 6,000,000
6 Kantor Pengawas dan Kontraktor (6x9)M2 M2 0.00 500,000 0
7 Bedeng Pekerja (6x9)M2 M2 0.00 350,000 0
8 WC Pekerja (3x3)M2 M2 0.00 350,000 0

9,150,000
II PEKERJAAN TANAH DAN GALIAN
1 Galian Footplate M3 47.00 18,000 846,000
2 Galian Pondasi Batu Kali M3 80.00 35,000 2,800,000
3 Urug kembali bekas galian M3 60.00 15,000 900,000

4,546,000
III PEKERJAAN PONDASI BATU KALI
1 Urug pasir Bawah Pondasi Batu Kali M3 5.00 90,000 450,000
2 Urug Pasir Bawah Pondasi Foot Plate M3 5.00 90,000 450,000

Page 9 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
KELAS
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

3 Pasangan Pondasi Batu Kali M3 48.00 300,000 14,400,000

15,300,000
IV PEKERJAAN BETON
1 Beton Footplate M3 8.00 2,000,000 16,000,000
2 Beton Kolom M3 12.00 3,750,000 45,000,000
3 Beton Sloof M3 6.00 2,750,000 16,500,000
4 Tangga M3 3.50 3,750,000 13,125,000
5 Beton Plat Lantai M3 19.00 3,000,000 57,000,000
6 Beton Kanopi Jendela M3 5.00 2,250,000 11,250,000
7 Kolom Praktis M3 1.20 2,250,000 2,700,000
8 Ringbalk M3 6.54 2,250,000 14,715,000

176,290,000
V PEKERJAAN DINDING
1 Pasang Dinding Hebel Bata Ringan 10 cm M2 290.00 135,000 39,150,000
2 Plester Aci Dinding Hebel M2 580.00 35,000 20,300,000
3 Plester Beton M2 140.00 35,000 4,900,000
4 Sponengan M1 510.00 7,500 3,825,000

68,175,000
VI PEKERJAAN PLAFON
1 Pas. Plafon, Gypsum 9 MM ex Jaya Boar/Knauf/Elephant M2 230.00 75,000 17,250,000

Page 10 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
KELAS
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

rangka besi Hollow Galvanish 20/40, siap cat

17,250,000
VII PEKERJAAN CAT
1 Cat Dinding ex Catylac M2 720.00 12,500 9,000,000
2 Cat Plafon ex Catylac M2 230.00 12,500 2,875,000

11,875,000
VIII PEKERJAAN PENUTUP LANTAI
1 Pas Keramik Lantai M2 230.00 125,000 28,750,000
2 Pas Keramik Lantai Kamar Mandi M2 12.00 125,000 1,500,000
3 Pas Keramik Dinding M2 57.00 125,000 7,125,000
4 Pas Keramik Tangga Masuk M2 36.00 125,000 4,500,000
5 Pemadatan Urugan Tanah dalam bangunan M2 125.00 7,500 937,500
6 Hamparan pasir t = 5 cm M2 125.00 3,500 437,500
7 Floor lantai kerja pasangan keramik M2 242.00 35,000 8,470,000
8 Plint keramik M1 115.00 35,000 4,025,000

55,745,000
IX PEKERJAAN ATAP
1 Rangka Atap Baja Ringan termasuk reng, dudukan lisplang M2 175.00 135,000 23,625,000
dan pengaku keliling pada kuda-kuda di ring balk
2 Penutup Atap Genteng Metal ex Sakura Roof setara M2 175.00 120,000 21,000,000

Page 11 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
KELAS
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

3 Nok Genteng Metal ex Sakura Roof setara M1 24.00 120,000 2,880,000


4 Aluminium foil Ex UNOfoil dg Anyaman Wiremesh M2 175.00 25,000 4,375,000
5 Lisplang Kalsiplang/GRC uk 10cm dan 20 cm terpasang M1 20.00 60,000 1,200,000
6 Asesoris Pemasangan Genteng Metal Lot 1.00 750,000 750,000
7 Pengecatan Lisplang M2 20.00 15,000 300,000

54,130,000
X PEKERJAAN PINTU DAN JENDELA
1 Kusen Aluminium Dan Pintu Kaca (Periksa Detail Lampiran) Lot 1.00 40,511,500 84,844,100

84,844,100
XI PEKERJAAN LISTRIK
1 Periksa Di Lembar Pekerjaan Listrik dan Penangkal Petir Lot 0

0
XII PEKERJAAN PENANGKAL PETIR ELEKTRIK
1 Periksa Di Lembar Pekerjaan Listrik dan Penangkal Petir Lot 0
0
XIII TELEPHONE DAN CABLE DATA
1 Instalasi Kabel Telephone Titik 6.00 145,000 870,000
2 Unit Outlet telephone Bh 6.00 42,500 255,000
3 Unit Pesawat Telephone Bh 6.00 150,000 900,000
4 Unit PABX Unit 1.00 2,500,000 2,500,000

Page 12 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
KELAS
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

4,525,000
XIV PEKERJAAN TATA UDARA
1 Instalasi dan Unit Ex Haust Fan dan Ceiling Fan terpasang Unit 11.00 750,000 8,250,000

8,250,000
XV PEKERJAAN AIR BERSIH DAN SANITASI
A Saluran Air Bersih
1 Instalasi Pipa dia. 4" AW M1 10.00 72,610 726,100
2 Instalasi Pipa dia. 3" AW M1 10.00 56,410 564,100
3 Instalasi Pipa dia. 2" AW M1 10.00 44,160 441,600
4 Instalasi Pipa dia. 1.5" AW distribusi sumur ke tangki M1 10.00 27,590 275,900
5 Instalasi Pipa dia. 1", 3/4". 1/2" AW ke titik Kran, Closet, dll Ls 1.00 1,247,500 1,247,500
6 Asesoris Penyambungan Tee, Sock, Knee dll Ls 1.00 1,500,000 1,500,000
7 Kran-kran Luar Bh 6.00 85,000 510,000
8 Pompa Distribusi dari Sumur ke Tangki Air Unit 1.00 4,500,000 4,500,000
9 Pompa Tendang distribusi dari Tangki ke Toilet Unit 1.00 650,000 650,000
10 Tangki Air Fibre kapasitas 1,000 lt Bh 1.00 1,450,000 1,450,000
11 Asesoris Instalasi Pompa dan Tangki Air Ls 1.00 450,000 450,000

12,315,200
B Saluran Tertutup Halaman
1 Saluran tertutup Bus Beton dia. 30 cm M1 30.00 145,000 4,350,000

Page 13 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
KELAS
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

2 Bak Kontrol untuk Saluran Tertutup Bh 8.00 300,000 2,400,000

6,750,000
C Septick Tank dan Peresapan
1 Sumur Resapan Air Hujan, bus beton dia. 80 cm dalam 2M Titik 6.00 750,000 4,500,000
2 Sumur Resapan KM, bus beton dia. 80 cm dalam 3M Titik 1.00 1,500,000 1,500,000
3 Septick Tank beton bertulang 1,5 x 2,5 M dalam 2 M Unit 1.00 1,750,000 1,750,000

7,750,000

XVI PEKERJAAN TOILET


1 Instalasi Asesoris Lengkap 4 toilet Ls 1.00 10,000,000 10,000,000

10,000,000

XVII PEKERJAAN RAILING TANGGA DAN BALKON


1 Railing Tangga M1 15.00 350,000 5,250,000
2 Railing Balkon M1 15.00 350,000 5,250,000

10,500,000

557,395,300 557,395,300

Page 14 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
KELAS
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

Jasa Pemborong 10% 55,739,530 55,739,530


Total Pekerjaan Konstruksi 613,134,830 613,134,830

Page 15 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA PUTRI
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

C BANGUNAN ASRAMA PUTRI

I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 190.00 5,000 950,000
2 Bowplank M1 65.00 30,000 1,950,000
3 Penentuan titik Pondasi dengan Theodolit Ls 1.00 600,000 600,000
4 Air Kerja masa konstruksi Ls 0.00 3,500,000 0
5 Listrik Kerja masa konstruksi Bln 12.00 500,000 6,000,000
6 Kantor Pengawas dan Kontraktor (6x9)M2 M2 0.00 500,000 0
7 Bedeng Pekerja (6x9)M2 M2 0.00 350,000 0
8 WC Pekerja (3x3)M2 M2 0.00 350,000 0

9,500,000
II PEKERJAAN TANAH DAN GALIAN
1 Galian Footplate M3 67.00 18,000 1,206,000
2 Galian Pondasi Batu Kali M3 115.00 35,000 4,025,000
3 Urug kembali bekas galian M3 90.00 15,000 1,350,000

6,581,000
III PEKERJAAN PONDASI BATU KALI
1 Urug pasir Bawah Pondasi Batu Kali M3 10.00 90,000 900,000
2 Urug Pasir Bawah Pondasi Foot Plate M3 10.00 90,000 900,000

Page 16 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA PUTRI
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

3 Pasangan Pondasi Batu Kali M3 69.00 300,000 20,700,000

22,500,000
IV PEKERJAAN BETON
1 Beton Footplate M3 11.25 2,000,000 22,500,000
2 Beton Kolom M3 18.00 3,750,000 67,500,000
3 Beton Sloof M3 9.00 2,750,000 24,750,000
4 Tangga M3 5.00 3,750,000 18,750,000
5 Beton Plat Lantai M3 35.00 3,000,000 105,000,000
6 Beton Kanopi Jendela M3 5.00 2,250,000 11,250,000
7 Kolom Praktis M3 2.70 2,250,000 6,075,000
8 Ringbalk M3 9.50 2,250,000 21,375,000

277,200,000
V PEKERJAAN DINDING
1 Pasang Dinding Hebel Bata Ringan 10 cm M2 415.00 135,000 56,025,000
2 Plester Aci Dinding Hebel M2 830.00 35,000 29,050,000
3 Plester Beton M2 200.00 35,000 7,000,000
4 Sponengan M1 726.00 7,500 5,445,000
5 Pas Ban-banan genteng M1 198.00 35,000 6,930,000

104,450,000
VI PEKERJAAN PLAFON

Page 17 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA PUTRI
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

1 Pas. Plafon, Gypsum 9 MM ex Jaya Boar/Knauf/Elephant M2 830.00 75,000 62,250,000


rangka besi Hollow Galvanish 20/40, siap cat

62,250,000
VII PEKERJAAN CAT
1 Cat Dinding ex Catylac M2 1,030.00 12,500 12,875,000
2 Cat Plafon ex Catylac M2 830.00 12,500 10,375,000

23,250,000
VIII PEKERJAAN PENUTUP LANTAI
1 Pas Keramik Lantai M2 360.00 125,000 45,000,000
2 Pas Keramik Lantai Kamar Mandi M2 55.00 125,000 6,875,000
3 Pas Keramik Dinding M2 230.00 125,000 28,750,000
4 Pas Keramik Tangga Masuk M2 36.00 125,000 4,500,000
5 Pemadatan Urugan Tanah dalam bangunan M2 1.00 7,500 7,500
6 Hamparan pasir t = 5 cm M2 200.00 3,500 700,000
7 Floor lantai kerja pasangan keramik M2 200.00 35,000 7,000,000
8 Plint keramik M1 165.00 35,000 5,775,000

98,607,500
IX PEKERJAAN ATAP
1 Rangka Atap Baja Ringan termasuk reng, dudukan lisplang M2 351.00 135,000 47,385,000
dan pengaku keliling pada kuda-kuda di ring balk

Page 18 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA PUTRI
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

2 Penutup Atap Genteng Metal ex Sakura Roof setara M2 351.00 120,000 42,120,000
3 Nok Genteng Metal ex Sakura Roof setara M1 33.00 120,000 3,960,000
4 Aluminium foil Ex UNOfoil dg Anyaman Wiremesh M2 351.00 25,000 8,775,000
5 Lisplang Kalsiplang/GRC uk 10cm dan 20 cm terpasang M1 35.00 60,000 2,100,000
6 Asesoris Pemasangan Genteng Metal Lot 1.00 750,000 750,000
7 Pengecatan Lisplang M2 35.00 15,000 525,000

105,615,000
X PEKERJAAN PINTU DAN JENDELA
1 Kusen Aluminium Dan Pintu Kaca (Periksa Detail Lampiran) Lot 1.00 111,138,350 111,138,350

111,138,350
XI PEKERJAAN LISTRIK
1 Periksa Di Lembar Pekerjaan Listrik dan Penangkal Petir Lot 0

0
XII PEKERJAAN PENANGKAL PETIR ELEKTRIK
1 Periksa Di Lembar Pekerjaan Listrik dan Penangkal Petir Lot 0
0
XIII TELEPHONE DAN CABLE DATA
1 Instalasi Kabel Telephone Titik 16.00 145,000 2,320,000
2 Unit Outlet telephone Bh 16.00 42,500 680,000
3 Unit Pesawat Telephone Bh 16.00 150,000 2,400,000

Page 19 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA PUTRI
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

4 Unit PABX Unit 1.00 2,500,000 2,500,000

7,900,000
XIV PEKERJAAN TATA UDARA
1 Instalasi dan Unit Ex Haust Fan dan Ceiling Fan terpasang Unit 11.00 750,000 8,250,000

8,250,000
XV PEKERJAAN AIR BERSIH DAN SANITASI
A Saluran Air Bersih
1 Instalasi Pipa dia. 4" AW M1 20.00 72,610 1,452,200
2 Instalasi Pipa dia. 3" AW M1 20.00 56,410 1,128,200
3 Instalasi Pipa dia. 2" AW M1 20.00 44,160 883,200
4 Instalasi Pipa dia. 1.5" AW distribusi sumur ke tangki M1 20.00 27,590 551,800
5 Instalasi Pipa dia. 1", 3/4". 1/2" AW ke titik Kran, Closet, dll Ls 1.00 2,000,000 2,000,000
6 Asesoris Penyambungan Tee, Sock, Knee dll Ls 1.00 2,000,000 2,000,000
7 Kran-kran Luar Bh 6.00 85,000 510,000
8 Pompa Distribusi dari Sumur ke Tangki Air Unit 1.00 4,500,000 4,500,000
9 Pompa Tendang distribusi dari Tangki ke Toilet Unit 1.00 650,000 650,000
10 Tangki Air Fibre kapasitas 1,000 lt Bh 1.00 1,450,000 1,450,000
11 Asesoris Instalasi Pompa dan Tangki Air Ls 1.00 450,000 450,000

15,575,400
B Saluran Tertutup Halaman

Page 20 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA PUTRI
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

1 Saluran tertutup Bus Beton dia. 30 cm M1 45.00 145,000 6,525,000


2 Bak Kontrol untuk Saluran Tertutup Bh 16.00 300,000 4,800,000

11,325,000
C Septick Tank dan Peresapan
1 Sumur Resapan Air Hujan, bus beton dia. 80 cm dalam 2M Titik 6.00 750,000 4,500,000
2 Sumur Resapan KM, bus beton dia. 80 cm dalam 3M Titik 1.00 1,500,000 1,500,000
3 Septick Tank beton bertulang 1,5 x 2,5 M dalam 2 M Unit 1.00 1,750,000 1,750,000

7,750,000

XVI PEKERJAAN TOILET


1 Instalasi Asesoris Lengkap 16 toilet + 2 wastafel Ls 1.00 45,000,000 45,000,000

45,000,000

XVII PEKERJAAN RAILING TANGGA DAN BALKON


1 Railing Tangga M1 15.00 350,000 5,250,000

5,250,000

922,142,250 922,142,250

Page 21 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA PUTRI
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

Jasa Pemborong 10% 92,214,225


Total Pekerjaan Konstruksi 1,014,356,475

Page 22 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA 2
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

D BANGUNAN ASRAMA 2

I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 137.00 5,000 685,000
2 Bowplank M1 55.00 30,000 1,650,000
3 Penentuan titik Pondasi dengan Theodolit Ls 1.00 600,000 600,000
4 Air Kerja masa konstruksi Ls 0.00 3,500,000 0
5 Listrik Kerja masa konstruksi Bln 12.00 500,000 6,000,000
6 Kantor Pengawas dan Kontraktor (6x9)M2 M2 0.00 500,000 0
7 Bedeng Pekerja (6x9)M2 M2 0.00 350,000 0
8 WC Pekerja (3x3)M2 M2 0.00 350,000 0

8,935,000
II PEKERJAAN TANAH DAN GALIAN
1 Galian Footplate M3 50.25 18,000 904,500
2 Galian Pondasi Batu Kali M3 86.50 35,000 3,027,500
3 Urug kembali bekas galian M3 69.00 15,000 1,035,000

4,967,000
III PEKERJAAN PONDASI BATU KALI
1 Urug pasir Bawah Pondasi Batu Kali M3 10.00 90,000 900,000
2 Urug Pasir Bawah Pondasi Foot Plate M3 10.00 90,000 900,000

Page 23 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA 2
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

3 Pasangan Pondasi Batu Kali M3 52.00 300,000 15,600,000

17,400,000
IV PEKERJAAN BETON
1 Beton Footplate M3 8.50 2,000,000 17,000,000
2 Beton Kolom M3 13.00 3,750,000 48,750,000
3 Beton Sloof M3 6.50 2,750,000 17,875,000
4 Tangga M3 3.75 3,750,000 14,062,500
5 Beton Plat Lantai M3 25.75 3,000,000 77,250,000
6 Beton Kanopi Jendela M3 5.00 2,250,000 11,250,000
7 Kolom Praktis M3 2.00 2,250,000 4,500,000
8 Ringbalk M3 7.00 2,250,000 15,750,000

206,437,500
V PEKERJAAN DINDING
1 Pasang Dinding Hebel Bata Ringan 10 cm M2 310.00 135,000 41,850,000
2 Plester Aci Dinding Hebel M2 620.00 35,000 21,700,000
3 Plester Beton M2 157.50 35,000 5,512,500
4 Sponengan M1 544.00 7,500 4,080,000
5 Pas Ban-banan genteng M1 46.80 35,000 1,638,000

74,780,500
VI PEKERJAAN PLAFON

Page 24 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA 2
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

1 Pas. Plafon, Gypsum 9 MM ex Jaya Boar/Knauf/Elephant M2 342.00 75,000 25,650,000


rangka besi Hollow Galvanish 20/40, siap cat

25,650,000
VII PEKERJAAN CAT
1 Cat Dinding ex Catylac M2 780.00 12,500 9,750,000
2 Cat Plafon ex Catylac M2 342.00 12,500 4,275,000

14,025,000
VIII PEKERJAAN PENUTUP LANTAI
1 Pas Keramik Lantai M2 270.00 125,000 33,750,000
2 Pas Keramik Lantai Kamar Mandi M2 18.00 125,000 2,250,000
3 Pas Keramik Dinding M2 103.00 125,000 12,875,000
4 Pas Keramik Tangga Masuk M2 36.00 125,000 4,500,000
5 Pemadatan Urugan Tanah dalam bangunan M2 130.00 7,500 975,000
6 Hamparan pasir t = 5 cm M2 130.00 3,500 455,000
7 Floor lantai kerja pasangan keramik M2 130.00 35,000 4,550,000
8 Plint keramik M1 115.00 35,000 4,025,000

63,380,000
IX PEKERJAAN ATAP
1 Rangka Atap Baja Ringan termasuk reng, dudukan lisplang M2 263.00 135,000 35,505,000
dan pengaku keliling pada kuda-kuda di ring balk

Page 25 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA 2
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

2 Penutup Atap Genteng Metal ex Sakura Roof setara M2 263.00 120,000 31,560,000
3 Nok Genteng Metal ex Sakura Roof setara M1 14.00 120,000 1,680,000
4 Aluminium foil Ex UNOfoil dg Anyaman Wiremesh M2 263.00 25,000 6,575,000
5 Lisplang Kalsiplang/GRC uk 10cm dan 20 cm terpasang M1 24.00 60,000 1,440,000
6 Asesoris Pemasangan Genteng Metal Lot 1.00 750,000 750,000
7 Pengecatan Lisplang M2 24.00 15,000 360,000

77,870,000
X PEKERJAAN PINTU DAN JENDELA
1 Kusen Aluminium Dan Pintu Kaca (Periksa Detail Lampiran) Lot 1.00 74,501,400 74,501,400

74,501,400
XI PEKERJAAN LISTRIK
1 Periksa Di Lembar Pekerjaan Listrik dan Penangkal Petir Lot 0

0
XII PEKERJAAN PENANGKAL PETIR ELEKTRIK
1 Periksa Di Lembar Pekerjaan Listrik dan Penangkal Petir Lot 0
0
XIII TELEPHONE DAN CABLE DATA
1 Instalasi Kabel Telephone Titik 12.00 145,000 1,740,000
2 Unit Outlet telephone Bh 12.00 42,500 510,000
3 Unit Pesawat Telephone Bh 12.00 150,000 1,800,000

Page 26 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA 2
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

4 Unit PABX Unit 1.00 2,500,000 2,500,000

6,550,000
XIV PEKERJAAN TATA UDARA
1 Instalasi dan Unit Ex Haust Fan dan Ceiling Fan terpasang Unit 16.00 750,000 12,000,000

12,000,000
XV PEKERJAAN AIR BERSIH DAN SANITASI
A Saluran Air Bersih
1 Instalasi Pipa dia. 4" AW M1 10.00 72,610 726,100
2 Instalasi Pipa dia. 3" AW M1 10.00 56,410 564,100
3 Instalasi Pipa dia. 2" AW M1 10.00 44,160 441,600
4 Instalasi Pipa dia. 1.5" AW distribusi sumur ke tangki M1 10.00 27,590 275,900
5 Instalasi Pipa dia. 1", 3/4". 1/2" AW ke titik Kran, Closet, dll Ls 1.00 2,000,000 2,000,000
6 Asesoris Penyambungan Tee, Sock, Knee dll Ls 1.00 2,000,000 2,000,000
7 Kran-kran Luar Bh 6.00 85,000 510,000
8 Pompa Distribusi dari Sumur ke Tangki Air Unit 1.00 4,500,000 4,500,000
9 Pompa Tendang distribusi dari Tangki ke Toilet Unit 1.00 650,000 650,000
10 Tangki Air Fibre kapasitas 1,000 lt Bh 1.00 1,450,000 1,450,000
11 Asesoris Instalasi Pompa dan Tangki Air Ls 1.00 450,000 450,000

13,567,700
B Saluran Tertutup Halaman

Page 27 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA 2
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

1 Saluran tertutup Bus Beton dia. 30 cm M1 24.00 145,000 3,480,000


2 Bak Kontrol untuk Saluran Tertutup Bh 10.00 300,000 3,000,000

6,480,000
C Septick Tank dan Peresapan
1 Sumur Resapan Air Hujan, bus beton dia. 80 cm dalam 2M Titik 6.00 750,000 4,500,000
2 Sumur Resapan KM, bus beton dia. 80 cm dalam 3M Titik 1.00 1,500,000 1,500,000
3 Septick Tank beton bertulang 1,5 x 2,5 M dalam 2 M Unit 1.00 1,750,000 1,750,000

7,750,000

XVI PEKERJAAN TOILET


1 Instalasi Asesoris Lengkap 16 toilet + 2 wastafel Ls 1.00 45,000,000 45,000,000

45,000,000

XVII PEKERJAAN RAILING TANGGA DAN BALKON


1 Railing Tangga M1 15.00 350,000 5,250,000

5,250,000

664,544,100 664,544,100

Page 28 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
ASRAMA 2
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

Jasa Pemborong 10% 66,454,410 66,454,410


Total Pekerjaan Konstruksi 730,998,510 730,998,510

Page 29 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
PEKERJAAN LISTRIK DAN PENANGKAL PETIR UNTUK SELURUH BANGUNAN
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

I PEKERJAAN LISTRIK
1 Instalasi Lampu Titik 133.00 145,000 19,285,000
2 Instalasi Stop Kontak Titik 52.00 145,000 7,540,000
3 Lampu PL Buah 133.00 30,000 3,990,000
4 Box MCB Unit 7.00 460,000 3,220,000
5 Instalasi Ground Titik 4.00 145,000 580,000
6 NYY / Toefoer 3 x 6 mm Meter 35.00 27,500 962,500
7 Unit Stop Kontak ex. Panasonic Bh 52.00 14,500 754,000
8 Unit Saklar Tunggal ex Panasonic Bh 133.00 12,000 1,596,000
9 Armature Downlight Bh 133.00 35,000 4,655,000

42,582,500
II PEKERJAAN PENANGKAL PETIR
1 BC 46.00 107,500 4,945,000
2 Pipa Galvanis 2.00 86,000 172,000
3 Sped Thomas 1.00 9,360,000 9,360,000
4 PVC 6.00 17,500 105,000
5 Begel 70.00 3,500 245,000
6 Klem 30.00 450 13,500
7 Fischr + Sekrup 2.00 55,000 110,000
8 Alat Bantu 1.00 125,000 125,000
9 Ground 1.00 1,250,000 1,250,000
10 Pemasangan 1.00 1,300,000 1,300,000

Page 30 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
PEKERJAAN LISTRIK DAN PENANGKAL PETIR UNTUK SELURUH BANGUNAN
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

17,625,500

TOTAL 60,208,000
Jasa Pemborong 10% 6,020,800
Total Pekerjaan Konstruksi 66,228,800

Page 31 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
BANGUNAN PENDUKUNG
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

I RUANG MAKAN DAN DAPUR


1 R. Makan 8 x 5 M2 M2 40.00 2,000,000 80,000,000
2 Dapur 2,5 x 2,5 M2 M2 6.25 2,000,000 12,500,000

92,500,000
II RUANG JAGA
1 Ukuran 3 x 3 M2 M2 9.00 2,000,000 18,000,000

18,000,000

III BANGSAL MOTOR


1 Terbuka beratap Poly carbonat 2,5 X 6 m2 M2 15.00 1,750,000 26,250,000

26,250,000
IV PEKERJAAN PAGAR KELILING
1 Pagar keliling panjang 95M1 t=3M M2 285.00 250,000 71,250,000
Dinding Batako termasuk pondasi batukali

71,250,000
V PERKERASAN HALAMAN/PARIR
1 Mix antara Rumput dan Paving M2 430.00 150,000 64,500,000
atau Grass block

Page 32 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
BANGUNAN PENDUKUNG
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total Catatan

64,500,000
VI PEKERJAAN TAMAN
1 30% dari Halaman diolah menjadi taman M2 130.00 75,000 9,750,000
tersebar dibeberapa area

9,750,000

TOTAL 282,250,000
Jasa Pemborong 10% 28,225,000
Total Pekerjaan Konstruksi 310,475,000

Page 33 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
PEKERJAAN KUSEN ALUMINIUM UNTUK SELURUH BANGUNAN
No. Bahan Ukuran Jml Vol Sat Harga Jumlah Harga/unit Jmlh Total Harga REZUME
Pjg Lbr PER GEDUNG
A. Masjid

1 PJ 01
Kusen 3" S 18 18.00 m1 55,000 990,000
Kaca Ben 2.1 0.8 2.00 3.36 m2 75,000 252,000
Kaca Ben 2 0.5 1.00 1.00 m2 75,000 75,000
Karet 36 36.00 m1 2,500 90,000
Daun Pint 2.1 0.8 2.00 2.00 unit 800,000 1,600,000
3,007,000 3 9,021,000

2 J 01
Kusen 3" S 8 8.00 m1 55,000 440,000
Kaca Ben 2 1.2 1.00 2.40 m2 75,000 180,000
Kaca Ben 1 0.5 1.00 0.50 m2 75,000 37,500
Karet 16 36.00 m1 2,500 90,000
Daun Jend 2 1.4 1.00 1.00 unit 750,000 750,000
1,497,500 4 5,990,000

3 J 02
Kusen 3" S 18 18.00 m1 55,000 990,000
Kaca Ben 2 0.9 3.00 5.40 m2 75,000 405,000
Kaca Ben 2 0.5 1.00 1.00 m2 75,000 75,000
Karet 36 36.00 m1 2,500 90,000
Daun Jend 2 0.9 3.00 3.00 unit 750,000 2,250,000
3,810,000 3 11,430,000

4 BV 01
Kusen 3" S 9 9.00 m1 55,000 495,000
Kaca Ben 4 0.5 1.00 2.00 m2 75,000 150,000

Page 34 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
PEKERJAAN KUSEN ALUMINIUM UNTUK SELURUH BANGUNAN
No. Bahan Ukuran Jml Vol Sat Harga Jumlah Harga/unit Jmlh Total Harga REZUME
Pjg Lbr PER GEDUNG
Karet 18 36.00 m1 2,500 90,000
735,000 3 2,205,000

5 BV 02
Kusen 3" S 6 6.00 m1 55,000 330,000
Kaca Ben 3 0.5 1.00 1.50 m2 75,000 112,500
Karet 12 36.00 m1 2,500 90,000
532,500 1 532,500

6 P 01
Kusen 3" S 7 7.00 m1 55,000 385,000
Jalusi / a 0.6 0.8 1.00 0.48 m2 400,000 192,000
Daun Pint 2.1 0.8 1.00 1.00 unit 800,000 800,000
1,377,000 4 5,508,000

7 P 02
Kusen 3" S 6 7.00 m1 55,000 385,000
Daun Pint 2.1 0.8 1.00 1.00 unit 800,000 800,000
1,185,000 1 1,185,000

8 Jalusi
Kusen 3" S 8 8.00 m1 55,000 440,000
Jalusi 3 0.6 1.00 1.80 m2 400,000 720,000
1,160,000 4 4,640,000

MASJID RESUME 23 40,511,500 40,511,500

B. KELAS
Lantai 1

Page 35 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
PEKERJAAN KUSEN ALUMINIUM UNTUK SELURUH BANGUNAN
No. Bahan Ukuran Jml Vol Sat Harga Jumlah Harga/unit Jmlh Total Harga REZUME
Pjg Lbr PER GEDUNG
1 PJ 01
Kusen 3" S 15.1 15.10 m1 55,000 830,500
Kaca Ben 0.6 0.9 1.00 0.54 m2 75,000 40,500
Kaca Ben 0.9 0.9 1.00 0.81 m2 75,000 60,750
Jalusi 0.6 2.4 1.00 1.44 m2 400,000 576,000
Karet 31 31.00 m1 2,500 77,500
Multiplex 2.1 0.9 1.00 1.89 m2 90,000 170,100
Daun Pint 2.1 0.9 1.00 1.00 unit 800,000 800,000
Daun Jdl 0.9 0.9 1.00 1.00 unit 350,000 375,000
2,930,350 4 11,721,400

2 PJ 02
Kusen 3" S 13 13.00 m1 55,000 715,000
Kaca Ben 0.9 0.9 1.00 0.81 m2 75,000 60,750
Jalusi 0.6 2.2 1.00 1.32 m2 400,000 528,000
Karet 26 26.00 m1 2,500 65,000
Multiplex 2.1 0.8 1.00 1.68 m2 90,000 151,200
Multiplex 2.1 0.5 1.00 1.05 m2 90,000 94,500
Daun Pintu 2.00 unit 800,000 1,600,000
Daun Jdl 0.9 0.9 1.00 1.00 unit 350,000 375,000
3,589,450 6 21,536,700

3 J 01
Kusen 3" S 17.4 17.40 m1 55,000 957,000
Kaca Ben 2.2 0.9 1.00 1.98 m2 75,000 148,500
Jalusi 2.2 0.6 1.00 1.32 m2 400,000 528,000
Karet 30 30.00 m1 2,500 75,000
Daun Jdl 0.9 0.9 1.00 2.00 unit 350,000 375,000
2,083,500 18 37,503,000

Page 36 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
PEKERJAAN KUSEN ALUMINIUM UNTUK SELURUH BANGUNAN
No. Bahan Ukuran Jml Vol Sat Harga Jumlah Harga/unit Jmlh Total Harga REZUME
Pjg Lbr PER GEDUNG

4 J 02
Kusen 3" S 9.3 12.00 m1 55,000 660,000
Kaca Ben 1.6 0.9 1.00 1.44 m2 75,000 108,000
Jalusi 1.6 0.6 1.00 0.96 m2 400,000 384,000
Karet 18 18.00 m1 2,500 45,000
Daun Jdl 0.9 0.9 1.00 1.00 unit 350,000 375,000
1,572,000 4 6,288,000

5 BV 01
Kusen 3" S 5 5.00 m1 55,000 275,000
Jalusi 1.6 0.6 1.00 0.96 m2 400,000 384,000
659,000 5 3,295,000

6 P 01
Kusen 3" S 5 5.00 m1 55,000 275,000
Daun Pint 2.1 0.8 1.00 1.00 unit 850,000 850,000
1,125,000 4 4,500,000

KELAS RESUME 41 84,844,100 84,844,100

C. ASRAMA PUTRI

1 PJ 01
Kusen 3" S 17 17.00 m1 55,000 935,000
Kaca Ben 0.5 0.9 2.00 0.90 m2 75,000 67,500
Jalusi 0.6 2.8 1.00 1.68 m2 400,000 672,000
Karet 30 30.00 m1 2,500 75,000
Multiplex 2.1 0.9 2.00 3.78 m2 90,000 340,200

Page 37 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
PEKERJAAN KUSEN ALUMINIUM UNTUK SELURUH BANGUNAN
No. Bahan Ukuran Jml Vol Sat Harga Jumlah Harga/unit Jmlh Total Harga REZUME
Pjg Lbr PER GEDUNG
Daun Pint 2.1 0.9 2.00 2.00 unit 800,000 1,600,000
3,689,700 1 3,689,700

2 PJ 02
Kusen 3" S 14.3 14.30 m1 55,000 786,500
Kaca Ben 1.3 0.9 1.00 1.17 m2 75,000 87,750
Jalusi 0.6 2.3 1.00 1.38 m2 400,000 552,000
Karet 25 25.00 m1 2,500 62,500
Multiplex 2.1 0.9 1.00 1.89 m2 90,000 170,100
Daun Jdl 0.8 0.9 1.00 1.00 unit 350,000 350,000
Daun Pint 2.1 0.9 2.00 2.00 unit 800,000 1,600,000
3,608,850 15 54,132,750

3 J 01
Kusen 3" S 9.3 9.30 m1 55,000 511,500
Kaca Ben 1.6 0.9 1.00 1.44 m2 75,000 108,000
Jalusi 1.6 0.6 1.00 0.96 m2 400,000 384,000
Karet 18 18.00 m1 2,500 45,000
Daun Jdl 0.9 0.9 1.00 1.00 unit 350,000 375,000
1,423,500 15 21,352,500

4 BV 01
Kusen 3" S 5 5.00 m1 55,000 275,000
Jalusi 1.6 0.6 1.00 0.96 m2 400,000 384,000
659,000 15 9,885,000

5 P 01
Kusen 3" S 7.2 7.20 m1 55,000 396,000
Jalusi 0.6 0.9 1.00 0.54 m2 400,000 216,000

Page 38 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
PEKERJAAN KUSEN ALUMINIUM UNTUK SELURUH BANGUNAN
No. Bahan Ukuran Jml Vol Sat Harga Jumlah Harga/unit Jmlh Total Harga REZUME
Pjg Lbr PER GEDUNG
Multiplex 2.1 0.9 1.00 1.89 m2 90,000 170,100
Daun Pint 2.1 0.9 1.00 1.00 unit 800,000 800,000
1,582,100 4 6,328,400

6 P 02
Kusen 3" S 5 5.00 m1 55,000 275,000
Daun Pint 2.1 0.8 1.00 1.00 unit 850,000 850,000
1,125,000 12 13,500,000

7 P 03
Kusen 3" S 5 5.00 m1 55,000 275,000
Daun Pint 2.1 0.7 1.00 1.00 unit 850,000 850,000
1,125,000 2 2,250,000

ASRAMA PUTRI RESUME 64 111,138,350 111,138,350

D. ASRAMA 2

1 PJ 01
Kusen 3" S 17 17.00 m1 55,000 935,000
Kaca Ben 0.5 0.9 2.00 0.90 m2 75,000 67,500
Jalusi 0.6 2.8 1.00 1.68 m2 400,000 672,000
Karet 30 30.00 m1 2,500 75,000
Multiplex 2.1 0.9 2.00 3.78 m2 90,000 340,200
Daun Pint 2.1 0.9 2.00 2.00 unit 800,000 1,600,000
3,689,700 1 3,689,700

2 PJ 02
Kusen 3" S 14.3 14.30 m1 55,000 786,500

Page 39 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
PEKERJAAN KUSEN ALUMINIUM UNTUK SELURUH BANGUNAN
No. Bahan Ukuran Jml Vol Sat Harga Jumlah Harga/unit Jmlh Total Harga REZUME
Pjg Lbr PER GEDUNG
Kaca Ben 1.3 0.9 1.00 1.17 m2 75,000 87,750
Jalusi 0.6 2.3 1.00 1.38 m2 400,000 552,000
Karet 25 25.00 m1 2,500 62,500
Multiplex 2.1 0.9 1.00 1.89 m2 90,000 170,100
Daun Jdl 0.8 0.9 1.00 1.00 unit 350,000 350,000
Daun Pint 2.1 0.9 2.00 2.00 unit 800,000 1,600,000
3,608,850 12 43,306,200

3 J 01
Kusen 3" S 9.3 9.30 m1 55,000 511,500
Kaca Ben 1.6 0.9 1.00 1.44 m2 75,000 108,000
Jalusi 1.6 0.6 1.00 0.96 m2 400,000 384,000
Karet 18 18.00 m1 2,500 45,000
Daun Jdl 0.9 0.9 1.00 1.00 unit 350,000 375,000
1,423,500 13 18,505,500

4 P 02
Kusen 3" S 5 5.00 m1 55,000 275,000
Daun Pint 2.1 0.8 1.00 1.00 unit 850,000 850,000
1,125,000 8 9,000,000

ASRAMA PUTRA RESUME 34 74,501,400 74,501,400


TOTAL KESELURUHAN 310,995,350

Summaries
A. Masjid 40,511,500
B. Kelas 84,844,100
C. Asrama Putri 111,138,350

Page 40 of 97
RENCANA ANGGARAN BIAYA
PEMBANGUNAN PONDOK PESANTREN
PEKERJAAN KUSEN ALUMINIUM UNTUK SELURUH BANGUNAN
No. Bahan Ukuran Jml Vol Sat Harga Jumlah Harga/unit Jmlh Total Harga REZUME
Pjg Lbr PER GEDUNG
D. Asrama Putra 74,501,400
TOTAL KESELURUHAN 310,995,350

TOTAL 310,995,350
Jasa Pemborong 10% 31,099,535
Total Pekerjaan Konstruksi 342,094,885

Page 41 of 97
RENCANA ANGGARAN BIAYA
HARGA SATUAN UNTUK PANDUAN
DATA UNTUK PEKERJAAN BANGUNAN 2 LANTAI DENGAN 1 BASEMENT
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan Ls 1,500,000 0
2 Bowplank M1 30,000 0
3 Penentuan titik Pondasi dengan Theodolit Ls 1,500,000 0
4 Kantor dan Gudang Kontraktor termasuk WC Pekerja M2 500,000 0
5 Direksi Keet uk. 4x4 M2 dengan listrik dan penerangan M2 500,000 0
6 Air Kerja masa konstruksi Ls 3,500,000 0
7 Listrik Kerja masa konstruksi Bln 500,000 0
8 Ukur Titik Pondasi, Kolom Lt.1 dan Kolom Lt.2 Lot 600,000 0
9 Kantor Pengawas dan Kontraktor (6x9)M2 M2 500,000 0
10 Bedeng Pekerja (6x9)M2 M2 350,000 0
11 WC Pekerja (3x3)M2 M2 350,000 0

0
II PEKERJAAN TANAH DAN GALIAN
1 Galian Pondasi Pagar lebar 100 cm dalam 100 CM dari M3 18,000 0
Permukaan Tanah Existing termasuk buangan p = 197 M1
2 Galian Pondasi Footplate Ukuran 150 cm x 150 cm , 27 titik M3 35,000 0
sedalam 400cm dari muka tanah existing, termasuk buangan
3 Pekerjaan Urugan Bekas Galian ke lahan Bangunan Kantor M3 15,000 0
termasuk pemadatan
4 Galian Pondasi Pagar lebar 100 cm dalam 100 CM dari M3 35,000 0
Permukaan Tanah Existing termasuk buangan p = 197 M1
5 Galian Pondasi Footplate Ukuran 150 cm x 150 cm , 27 titik M3 35,000 0
sedalam 400cm dari muka tanah existing, termasuk buangan

0
III PEKERJAAN PONDASI BATU KALI
1 Urug pasir Bawah Pondasi Batu Kali Pagar 0,05x1x197M1 M3 90,000 0
2 Urug Pasir Bawah Pondasi Foot Plate 1,5 x 1,5 x 0,05 x 27 titik M3 90,000 0
3 Pekerjaan Pondasi Batu Kali Pagar, dasar 80 cm, atas 30 cm M3 300,000 0
tinggi dari dasar galian 100 cm + 250 cm = 350 cm, p=108,5M1
4 Pekerjaan Pondasi Batu Kali Pagar, dasar 60 cm, atas 30 cm M3 300,000 0
tinggi dari dasar galian 100 cm, p = 88,8 M1 (lahan depan)
5 Pekerjaan Pondasi Batu Kali tumpuan Pondasi Footplate F1 M3 300,000 0
uk. 150cm x 150 cm t= 400 cm jumlah 18 Titik
6 Pekerjaan Pondasi Batu Kali tumpuan Pondasi Footplate F2 M3 300,000 0
uk. 150cm x 150cm t= 400 Cm, jumlah 9 Titik
7 Pekerjaan Pondasi Batu Kali Pagar, dasar 80 cm, atas 30 cm M3 300,000 0
tinggi dari dasar galian 100 cm + 250 cm = 350 cm, p=42M1
8 Pekerjaan Pondasi Batu Kali Pagar, dasar 60 cm, atas 30 cm M3 300,000 0
tinggi dari dasar galian 100 cm, p = 40 M1 (lahan depan)

Page 42
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

Pas Bata 1 Batu Pengganti Dinding Batu Kali Basement


9 Pas dinding 1 Bata Pengganti Penahan Tanah Basement M2 250,000 0
10 Kolom Praktis 15/30 Penguat pas bata x 77,70 M1 M3 1,950,320 0
11 Waterproofing Dinding Luar Pas Bata t=300cm M2 20,000 0

IV PEKERJAAN BETON
A PEKERJAAN BETON PONDASI FOOT PLATE
1 Foot Plate F1 Uk. 150 x 150 cm t=30cm dalam bangunan M3 1,950,320 0
jumlah 18 Titik
2 Foot plate F2 Uk. 150x150cm t=30cm, pinggir M3 1,950,320 0
berhubungan dengan pagar keliling, 9 Titik
(Semua pekerjaan beton K.200 sudah termasuk bekisting)
3 Foot plate F2 Uk. 150x150cm t=30cm, pinggir M3 1,950,320 0
berhubungan dengan pagar keliling, 9 Titik
(Semua pekerjaan beton K.250 sudah termasuk bekisting)

0
B PEK. BETON KOLOM STRUKTUR PONDASI (BASEMENT)
1 Kolom Pondasi uk. 40x45 cm t= 180 cm , 27 kolom + 1 ttk M3 3,750,000 0
2 Tie Beam 25/40 cm pengikat kolom bawah tanah p = 235,9 M1 M3 2,750,000 0
(Semua pekerjaan beton K.200 sudah termasuk bekisting)
3 Kolom Pondasi uk. 40x45 cm t= 280 cm , 27 kolom + 1 ttk M3 3,750,000 0
4 Tie Beam 25/40 cm pengikat kolom bawah tanah p = 235,9 M1 M3 2,780,000 0
(Semua pekerjaan beton K.250 sudah termasuk bekisting)

0
C PEKERJAAN BETON STRUKTUR LT.1
1 Balok Lantai S 25/40 (Sloof) p = ( 133,5 + 102,4) M1 M3 2,750,000
2 Kolom Lantai 1 uk. 40x45 t=350 cm, 27 kolom M3 3,750,000 0
(Semua pekerjaan beton K.250 sudah termasuk bekisting)
3 Balok Lantai B1 + B2 25/45 p = ( 133,5 + 102,4) M1 M3 3,506,395 0
4 Balok Lantai B3 20/40 p = ( 140,83) M1 M3 3,412,215 0
5 Kolom Lantai 1 uk. 40x45 t=350 cm, 27 kolom + 1 ttk M3 3,508,995 0
6 Kolom Lantai 1 uk. 40x45 t=100 cm, 28 kolom M3 3,508,995 0
7 Plat Lantai beton Bondex bertulang tebal = 12 cm x 393,5 M2 M3 2,558,305 0

0
D PEKERJAAN BETON STRUKTUR LT.2
1 Balok Beton B1 25/50 p = 127,5 M1 M3 3,850,000 0
Balok Beton B2 25/40 p = 105,1 M1 M3 3,850,000 0
Balok Beton B3 20/40 p = (62,8 + 81.5) M3 3,850,000 0
2 Kolom Lantai 2 uk. 30x30 t=350 cm, 27 kolom M3 3,950,000 0
3 Kolom Beton Sekat J.04 (20x40)x350cm , 4 bh M3 3,100,000 0
4 Plat Lantai beton bertulang tebal = 12 cm x 393,5 M2 M3 3,100,000 0
(optional, dapat diganti material yg lebih ringan dan cepat)
(Semua pekerjaan beton K.250 sudah termasuk bekisting)

Page 43
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

1 Balok Beton B1 25/50 p = 127,5 M1 M3 3,417,735 0


Balok Beton B2 25/40 p = 105,1 M1 M3 3,506,395 0
Balok Beton B3 20/40 p = (62,8 + 81.5) M3 3,412,215 0
2 Kolom Lantai 2 uk. 30x30 t=350 cm, 27 kolom M3 4,830,955 0
3 Kolom Beton Sekat J.04 (20x40)x350cm , 4 bh M3 4,830,955 0
4 Plat Lantai beton Bondex bertulang tebal = 12 cm x 393,5 M2 M3 3,084,365 0

0
E PEKERJAAN BETON STRUKTUR ATAP
1 Balok Beton B3 20/40 penahan atap beton p = (100,7 + 115,5) M3 3,850,000 0
2 Balok Beton B4 15/35 penahan atap beton p = (75 + 47,3)M1 M3 3,850,000 0
3 Plat Atap Beton bertulang tebal = 10 cm x 236,50 M2 M3 3,100,000 0
4 Balok beton diatas jendela R. Meeting M3 3,850,000 0
(Semua pekerjaan beton K.250 sudah termasuk bekisting)
1 Balok Beton B3 20/40 penahan atap beton p = (100,7 + 115,5) M3 3,412,215 0
2 Balok Beton B4 15/35 penahan atap beton p = (75 + 47,3)M1 M3 4,299,305 0
3 Plat Atap Beton bertulang tebal = 10 cm x 236,50 M2 M3 2,834,800 0
4 Balok beton diatas jendela R. Meeting M3 4,830,955 0
(Semua pekerjaan beton K.250 sudah termasuk bekisting)

0
V PEKERJAAN TANGGA
A TANGGA UTAMA
1 Pondasi Foot Plate Tangga K.200 M3 1,950,000 0
2 Cor Beton Plat Tangga K.250 M3 3,850,000 0
3 Keramik Penutup trap Tangga Granito Setara uk 30x30 M2 175,000 0
4 Step Nosing Tangga M1 75,000 0
5 Railling Tangga Stainless uk 2" tebal 2.3 mm M1 250,000 0
6 Cor Beton Plat Tangga K.250 M3 3,509,850 0
7 Keramik Penutup trap Tangga Niro Granit Setara uk 30x30 M2 275,000 0
8 Step Nosing Tangga Niro Granit setara M1 150,000 0
9 Railling Tangga Stainless uk 2" tebal 2.3 mm M1 575,000 0
10 Plester aci permukaan bawah tangga dan samping M2 33,875 0

0
B TANGGA SERVICE
1 Pondasi Foot Plate Tangga M3 1,950,000 0
2 Cor Beton Plat Tangga K.250 M3 3,850,000 0
3 Keramik Penutup trap Tangga uk 30x30 ex Roman Setara M2 90,000 0
4 Step Nosing Tangga M1 35,000 0
5 Railling Tangga Stainless uk 2" tebal 2.3 mm M1 250,000 0
6 Tangga Besi Ruang Jaga Belakang lebar 60cm Unit 1,750,000 0
7 Cor Beton Plat Tangga K.250 M3 3,509,850 0
8 Keramik Penutup trap Tangga uk 30x30 ex Roman Setara M2 97,240 0
9 Step Nosing Tangga M1 50,350 0
10 Railling Tangga Stainless uk 2" tebal 2.3 mm M1 250,000 0

Page 44
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

11 Plester aci permukaan bawah tangga dan samping M2 33,875 0

0
C TANGGA BASEMENT DEPAN
1 Pondasi Foot Plate Tangga M3 3,508,995 0
2 Cor Beton Plat Tangga K.250 M3 3,509,850 0
3 Keramik Penutup trap Tangga uk 30x30 ex Roman Setara M2 97,240 0
4 Step Nosing Tangga M1 50,350 0
5 Plester aci permukaan bawah tangga dan samping M2 33,875 0

D TANGGA BASEMENT BELAKANG


1 Pondasi Foot Plate Tangga M3 3,508,995 0
2 Cor Beton Plat Tangga K.250 M3 3,509,850 0
3 Keramik Penutup trap Tangga uk 30x30 ex Roman Setara M2 97,240 0
4 Step Nosing Tangga M1 50,350 0
5 Plester aci permukaan bawah tangga dan samping M2 33,875 0

VI PEKERJAAN DINDING
A LANTAI 1
1 Pekerjaan Pasangan Dinding Hebel t=10cm
Toilet M2 135,000 0
Janitor dan Pantry M2 135,000 0
Gudang Belakang M2 135,000 0
R. Genset M2 135,000 0
R. Tangga, Entrance Belakang dan R. Makan M2 135,000 0
R. Workstation M2 135,000 0
Reception M2 135,000 0
Perpustakaan M2 135,000 0
R. Computer M2 135,000 0
R. Kesehatan M2 135,000 0
Plester Aci Dinding dalam M2 25,000 0

a Total Pasangan Hebel Lantai 1 M2 135,000 0


b Kolom praktis 10/10 x 287 M1 M3 2,093,000 0
c Ringbalk 15/20 x 9,50 M1 M3 2,335,250 0
d Plester Aci Dinding M2 33,875 0

2 Dinding Kaca Rangka Aluminium 4", Powder Coat


R. Perpustakaan
- Aluminium M1 97,000 0

Page 45
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

- Kaca Rayben 5mm M2 90,000 0


R. Computer
- Aluminium M1 97,000 0
- Kaca Rayben 5mm M2 90,000 0
R. Kesehatan
- Aluminium M1 97,000 0
- Kaca Rayben 5mm M2 90,000 0
0
3 Plester Kolom Beton
Plester Kolom Beton 40x45 t=350cm, 27 kolom M2 25,000 0
Plester Kolom Beton 40x45 t=350cm, 27 kolom M2 36,920 0

0
B LANTAI 2
1 Pekerjaan Pasangan Dinding Hebel t=10cm
Toilet M2 135,000 0
R. Wudhu M2 135,000 0
R. Tidur + Selasar M2 135,000 0
R. Staff Ahli 3 dan 4 M2 135,000 0
R. Workstation M2 135,000 0
R. Meeting M2 135,000 0
R. Tangga Depan M2 135,000 0
R. Tamu Direksi M2 135,000 0
R. Direksi M2 135,000 0
R. Staff Ahli 1 dan 2 M2 135,000 0
Plester Aci Dinding M2 35,000 0

a Total Pasangan Hebel Lantai 2 M2 135,000 0


b Kolom praktis 10/10 x 277 M1 M3 2,093,000 0
c Ringbalk 15/20 x 43 M1 M3 2,335,250 0
d Plester Aci Dinding M2 33,875 0
e Pas Batu Tempel Dinding Tonjolan Depan M2 300,000 0
f Frame Kotak Rangka Besi Kanal C dudukan Frame Kaca Depan M1 750,000 0
area Tangga Utama ditutup Kalsiboard finish cat

0
2 Dinding Kaca Rangka Aluminium 4", Powder Coat
R. Tidur + Selasar
- Aluminium M1 97,000 0
- Kaca Rayben 5mm M2 90,000 0
R. Staff Ahli 3 dan 4
- Aluminium M1 97,000 0
- Kaca Rayben 5mm M2 90,000 0
R. Direksi
- Aluminium M1 97,000 0
- Kaca Rayben 5mm M2 90,000 0

Page 46
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

R. Staff Ahli 1 dan 2


- Aluminium M1 97,000 0
- Kaca Rayben 5mm M2 90,000 0
0
3 Pekerjaan Plester Kolom, Angin-2 Beton dan Glasblock
a Plester Kolom Beton 30x30 t= 350cm , 27 kolom M2 25,000 0
b Pas. Dinding Angin2/Glasblock Penerangan Plafon Lt.1 M2 85,000 0
- Glasblock (5 x 10 bh) Bh 25,000 0
- Angin-angin (5 x 8 bh) Bh 15,000 0
c Pas. Dinding Angin2/Glasblock Penerangan Plafon Lt.2 M2 85,000 0
- Glasblock (8 x 10 bh) Bh 25,000 0
- Angin-angin (8 x 8 bh) Bh 15,000 0

a Plester Kolom Beton 30x30 t= 350cm , 27 kolom M2 36,920 0


b Pas. Dinding Angin2/Glasblock Penerangan Plafon Lt.1 M2 62,720 0
- Glasblock (5 x 10 bh) Bh 20,000 0
- Angin-angin (5 x 8 bh) Bh 15,000 0
c Pas. Dinding Angin2/Glasblock Penerangan Plafon Lt.2 M2 68,360 0
- Glasblock (8 x 10 bh) Bh 20,000 0
- Angin-angin (8 x 8 bh) Bh 15,000 0

C BASEMENT
1 Plester Kolom Beton 40x45 t=300cm, 27 kolom M2 36,920 0
2 Plester Aci Kolom Praktis Basement M2 36,920 0
3 Plester Aci Dinding Pendek Depan M2 36,920 0

VII PEKERJAAN PLAFON


A LANTAI 1
1 Pas. Plafon, Gypsum 9 MM ex Jaya Boar/Knauf/Elephant M2 75,000 0
rangka besi Hollow Galvanish 20/40, siap cat
2 Pas. Plafon Akustik 60x120 cm M2 100,000 0
3 Pas. Plafon GRC / Kalsiboard M2 90,000 0
1 Pas. Plafon, Gypsum 9 MM ex Jaya Boar/Knauf/Elephant M2 60,000 0
rangka besi Hollow Galvanish 20/40, siap cat
2 Pas. Plafon, Cross Tee Main Tee M2 67,000 0
3 Pas. Plafon, Kalsiboard M2 70,000 0
4 Pas. Drop Ceiling Gypsum M1 30,000 0
5 Pas. Drop Ceiling Kalsiboard M1 35,000 0
6 Partisi Gypsum M2 115,000 0
7 Partisi Gypsum+Kalsiboard M2 127,500 0

Page 47
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

B LANTAI 2
1 Pas. Plafon, Gypsum 9 MM ex Jaya Boar/Knauf/Elephant M2 75,000 0
rangka besi Hollow Galvanish 20/40, siap cat
2 Pas. Plafon Akustik 60x120 cm M2 100,000 0
3 Pas. Plafon GRC / Kalsiboard M2 90,000 0
1 Pas. Plafon, Gypsum 9 MM ex Jaya Boar/Knauf/Elephant M2 60,000 0
rangka besi Hollow Galvanish 20/40, siap cat
2 Pas. Plafon, Cortemainte M2 67,000 0
3 Pas. Plafon, Kalsiboard M2 70,000 0
4 Pas. Drop Ceiling Gypsum M1 30,000 0
5 Pas. Drop Ceiling Kalsiboard M1 35,000 0
6 Partisi Gypsum M2 115,000 0
7 Partisi Gypsum+Kalsiboard M2 127,500 0

VIII PEKERJAAN CAT


A PENGECATAN DINDING
1 Cat Dinding Luar Lt. 1 ex Mowilex Weathershield M2 26,500 0
2 Cat Dinding Luar Lt. 2 ex Mowilex Weathershield M2 26,500 0
3 Cat Dinding Dalam Lt. 1 ex Catylac M2 12,500 0
4 Cat Dinding Dalam Lt. 2 ex Catylac M2 12,500 0
5 Pelapisan dinding luar pagar dg Aquaproof atau setara M2 20,000 0

1 Cat Dinding Luar Lt. 1 ex Mowilex/Dulux Weathershield M2 26,500 0


2 Cat Dinding Luar Lt. 2 ex Mowilex/Dulux Weathershield M2 26,500 0
3 Cat Dinding Dalam Lt. 1 ex Dulux Interior M2 22,500 0
4 Cat Dinding Dalam Lt. 2 ex Dulux Interior M2 22,500 0
5 Cat permukaan dinding tangga M2 22,500 0
6 Cat area Basement M2 26,500 0

B PENGECATAN PLAFON
1 Cat Plafon Lt.1 ex. Catylac M2 15,000 0
2 Cat Plafon Lt.2 ex. Catylac M2 15,000 0
1 Cat Plafon Lt.1 ex. Dulux Interior M2 22,500 0
2 Cat Plafon Lt.1 ex. Dulux Eksterior M2 26,500 0
3 Cat Plafon Lt.2 ex. Dulux Interior M2 22,500 0
4 Cat Plafon Lt.2 ex. Dulux Eksterior M2 26,500 0
5 Cat permukaan bawah Bondex M2 22,500 0

IX PEKERJAAN PENUTUP LANTAI DAN ATAP BETON


A LANTAI 1

Page 48
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

1 Pemadatan Urugan Tanah dalam bangunan M2 7,500 0


2 Hamparan pasir t = 5 cm M2 3,500 0
3 Floor lantai kerja pasangan keramik M2 35,000 0
4 Keramik Main Entrance uk. 60x60 ex Granito setara M2 175,000 0
5 Step Nosing M1 75,000 0
6 Keramik Side Ent. Uk 30x30 ex Roman Setara M2 90,000 0
7 Step Nosing M1 25,000 0
8 Keramik Reception uk. 60x60 ex Granito setara M2 175,000 0
9 Keramik uk. 40x40 ex Roman setara M2 90,000 0
10 Keramik uk 30x30 ex Roman setara M2 90,000 0
11 Leveling permukaan plat lantai beton t = 2cm M2 21,960 0
12 Keramik Lantai Staff 40x40 M2 120,000 0
13 Keramik Lantai Perpusatakaan 60x60 M2 300,000 0
14 Keramik Lantai Reception M2 300,000 0

0
B LANTAI 2
1 Leveling permukaan plat lantai beton t = 2cm M2 12,500 0
2 Keramik R. Meeting uk. 40x40 ex Roman setara M2 90,000 0
3 Keramik uk. 40x40 ex Roman setara M2 90,000 0
4 Keramik uk. 30x30 ex Roman eetara M2 90,000 0
5 Keramik uk. 40x40 penutup dak beton Lt. 2 ex Roman setara M2 90,000 0
6 Leveling permukaan plat lantai beton t = 2cm M2 21,960 0
7 Keramik Staff Lantai 40x40 M2 120,000 0
8 Keramik Lantai Direksi 60x60 M2 300,000 0
9 Keramik R. Tamu Direksi M2 300,000 0
10 Keramik Ruang Meeting 60x60 M2 300,000 0

0
C OUT DOOR LT.2 DAN ATAP BETON
1 Leveling permukaan beton Atap M2 12,500 0
2 Water proofing area terbuka plat Atap M2 25,000 0
3 Penutup atap pas. Keramik 20x20 (optional) M2 90,000 0
1 Leveling permukaan beton Atap M2 21,960 0
2 Water proofing area terbuka plat Atap M2 40,000 0

0
D LANTAI BASEMENT
1 Perataan dan Perkerasan Tanah M2 5,000 0
2 Hamparan pasir dan sirtu dasar paving t = 12cm, L=380M2 M3 90,000 0
3 Paving Block terpasang berpola M2 150,000 0

X PEKERJAAN ATAP
1 Rangka Atap Baja Ringan termasuk reng, dudukan lisplang M2 135,000 0

Page 49
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

dan pengaku keliling pada kuda-kuda di ring balk


2 Penutup Atap Genteng Metal ex Sakura Roof setara M2 120,000 0
3 Nok Genteng Metal ex Sakura Roof setara M1 120,000 0
4 Wall flashing genteng metal ex Sakura Roof setara M1 35,000 0
5 Aluminium foil Ex UNOfoil dg Anyaman Wiremesh M2 25,000 0
6 Lisplang Kalsiplang/GRC uk 10cm dan 20 cm terpasang M1 60,000 0
7 Asesoris Pemasangan Genteng Metal Lot 750,000 0
8 Pas. Hebel untuk Kuda-kuda Sopi-sopi M2 135,000 0
9 Ring balk Beton 10/20, p= 35,40 M1 M1 2,250,000 0
10 Kolom Praktis 10/20, p= 15 M1 M1 2,250,000 0
11 Plester Aci Permukaan Sopi-sopi M2 25,000 0
12 Pengecatan Permukaan Sopi-sopi M2 26,500 0
13 Pengecatan Lisplang M2 15,000 0

1 Rangka Atap Baja Ringan termasuk reng, dudukan lisplang M' 135,000 0
dan pengaku keliling pada kuda-kuda di ring balk (terpasang )
2 Penutup Atap Genteng Metal ex Sakura Roof M2 120,000 0
3 Nok Genteng Metal ex Sakura Roof M1 120,000 0
5 Aluminium foil satu muka M2 25,000 0
7 Asesoris Pemasangan Genteng Metal Lot 1,500,000 0
6 Rangka lisplank saja ( terpasang ) (terpasang) M1 32,500 0
7 Lisplang Kalsiplang/GRC uk 10cm dan 20 cm (terpasang) M1 28,900 0
8 Hebel M2 135,000 0
9 Kolom Praktis 63 M1 M3 2,093,000 0
10 Ringbalok praktis 86 M1 M3 2,335,250 0
11 Plester Aci Permukaan Sopi-sopi M2 36,920 0
12 Pengecatan Permukaan Sopi-sopi M2 28,280 0
13 Pengecatan Lisplang M2 27,885 0

0
XI PEKERJAAN PINTU DAN JENDELA
A PINTU JENDELA LANTAI 1
1 Pintu Jendela PJ.01 = 1 Unit, terpasang
Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 8 MM Rayban M2 350,000 0
Pintu Kaca Double Frameless (0.9x2.1) x 2 lbr terpasang Lbr 4,500,000 0
Hebel 10cm dudukan kusen M2 135,000 0

2 Jendela J.01 = 1 Unit, terpasang


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 8 MM Rayban M2 350,000 0
Hebel 10 cm dudukan kusen M2 135,000 0

3 Jendela J.02 = 1 Unit, terpasang


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 8 MM Rayban M2 350,000 0

Page 50
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

Hebel 10 cm dudukan kusen M2 135,000 0

4 Pintu Jendela PJ.02.a = 1 Unit, terpasang


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 5 MM Rayben M2 90,000 0
Frame daun BV M1 120,000 0
Asesoris BV Set 125,000 0
Hebel 10 cm dudukan kusen M2 135,000 0
Daun Pintu Kayu Jati (0.9x2.1) Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0

5 Jendela J.03 = 1 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 8 MM Rayben M2 350,000 0
Hebel 10 cm dudukan kusen M2 135,000 0

6 Pintu P.06 = 1 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 5 MM Rayben M2 90,000 0
Frame daun BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu Jati (0.8x2.1) Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0

7 Pintu P.05 = 4 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Daun Pintu Plastik Urat Kayu (0,7x1,8) lengkap dg handle Unit 850,000 0
Stel Daun Pintu Unit 75,000 0

8 Pintu P.04 = 2 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 5 MM Rayben M2 90,000 0
Frame daun BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu Jati (0.8x2.1) Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0

9 Pintu Jendela PJ.05.a = 1 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 5 MM Rayben M2 90,000 0

Page 51
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

Frame daun BV M1 120,000 0


Asesoris BV Set 125,000 0
Daun Pintu Kayu Jati (0.8x2.1) Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Pasangan Hebel dudukan PJ.05.a M2 135,000 0
Stel Daun Pintu Unit 75,000 0

10 Pintu Jendela PJ.04.a = 1 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 5 MM Rayben M2 90,000 0
Frame daun BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu Jati (0.8x2.1) Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0

11. Pintu P.01 = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca 5 MM Rayben M2 90,000 0
Frame daun BV M1 120,000 0
Daun Pintu Kayu Jati (0.9x2.1) x 2 bh Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0

12 Pintu Jendela PJ.03 = 1 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 8 MM Rayben M2 350,000 0
Frame daun BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu Jati (0.9x2.1) Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Pasangan Hebel dudukan PJ.03 M2 135,000 0

13 Pintu P.02 = 2 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 5 MM Rayben M2 90,000 0
Frame daun BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu Jati (0.9x2.1) Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0

Page 52
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

14 Pintu P.03 = 1 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 5 MM Rayben M2 90,000 0
Frame daun BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu Jati (0.8x2.1)x2 bh Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0

15 Jendela J.04 = 6 unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 5 MM Rayben M2 90,000 0
Frame Jendela M1 120,000 0
Asesories Daun Jendela 2 Unit Set 150,000 0
Pasang Hebel 10cm dudukan Jendela M2 135,000 0

16 Jendela J.05 = 1 unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Kaca 5 MM Rayben M2 90,000 0
Frame Jendela M1 120,000 0
Asesories Daun Jendela 3 set Set 150,000 0
Pasang Hebel 10cm dudukan Jendela M2 135,000 0

17 Angin-angin BV.01 = 3 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Frame BV M1 120,000 0
Kaca 5 MM Rayben M2 90,000 0
Asesoris BV Set 125,000 0

18 Angin-angin BV.02 = 4 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Frame BV M1 120,000 0
Kaca 5 MM Rayben M2 90,000 0
Asesoris BV Set 125,000 0

19 Pekerjaan Rangka Aluminium dan Kaca Lot 118,184,975 0


20 Pintu Press Excellent Unit 1,400,000 0
21 Pintu Toilet WPC Excellent Unit 850,000 0
22 Finish Melamik Pintu Press Excellent M2 95,000 0
23 Finish Duco Pintu Toilet M2 140,000 0
24 Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
25 Stel Pintu Unit 75,000 0

Page 53
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

B PINTU JENDELA LANTAI 2


1 Pintu Jendela PJ.04.b = 2 Unit
Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu (0,8x2,1) x 2 lbr Unit 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0
Hebel 10cm dudukan kusen M2 135,000 0

2 Pintu Jendela PJ.05.b = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu (0,8x2,1) x 2 lbr Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0
Hebel 10cm dudukan kusen M2 135,000 0

3 Pintu Jendela PJ.06 = 2 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M2 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu (0,8x2,1) x 2 lbr Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0
Hebel 10cm dudukan kusen M2 135,000 0

4 Jendela J.11 = 7 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0
Frame Jendela 3 Lubang M1 120,000 0
Asesoris Frame Jendela Set 150,000 0
Hebel 10cm dudukan kusen M2 135,000 0

5 Jendela J.14 = 4 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0

Page 54
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

Kaca Rayben 5MM M2 90,000 0


Frame BV M1 120,000 0
Asesoris BV Set 125,000 0
Frame daun Jendela M1 120,000 0
Asesoris Frame Jendela Set 150,000 0
Hebel 10cm dudukan kusen M2 135,000 0

6 Jendela J.12 = 3 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0
Frame daun Jendela M1 120,000 0
Asesoris Frame Jendela Set 150,000 0
Hebel 10cm dudukan kusen M2 135,000 0

7 Jendela J.13 = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV 2 lubang M1 120,000 0
Asesoris BV Set 125,000 0
Frame daun Jendela 2 lubang M1 120,000 0
Asesoris Frame Jendela Set 150,000 0
Hebel 10cm dudukan kusen M2 135,000 0

8 Pintu P.07 = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu (0,9x2,1) x 1lbr Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0

9 Pintu P.08 = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu (0,8x2,1) x 1 lbr Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0

10 Jendela J.10 = 2 Unit

Page 55
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

Kusen Aluminium 4", Powder Coat M1 97,000 0


Kaca Rayben 8MM M2 350,000 0
Hebel 10cm dudukan kusen M2 135,000 0

11 Jendela J.09 = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 8MM M2 350,000 0
Hebel 10cm dudukan kusen M2 135,000 0

12 Jendela J.07 = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 8MM M2 350,000 0
Hebel 10cm dudukan kusen M2 135,000 0

13 Jendela J.08 = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 8MM M2 350,000 0
Hebel 10cm dudukan kusen M2 135,000 0

14 Jendela J.06 = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 8MM M2 350,000 0
Hebel 10cm dudukan kusen M2 135,000 0

15 Angin-angin BV.03 = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0

16 Pintu Jendela PJ.02.b = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu (0,9x2,1) x 1 lbr Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0
Hebel 10cm dudukan kusen M2 135,000 0

17 Pintu P.09 = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0

Page 56
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

Daun Pintu Kayu (0,8x2,1) x 1 lbr Bh 1,500,000 0


Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0

18 Pintu P.04 = 2 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu (0,8x2,1) x 1 lbr Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0

19 Pintu P.05 = 4 Unit


Kusen Alumunium 4" Powder Coat M1 97,000 0
Daun Pintu Plastik Urat Kayu (0,7x1,8) lengkap dg handle Unit 850,000 0
Stel Daun Pintu Unit 75,000 0

20 Pintu Jendela PJ.04.a = 3 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0
Daun Pintu Kayu (0,8x2,1) x 1lbr Bh 1,500,000 0
Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
Finishing Melamik Daun Pintu Kayu M2 90,000 0
Stel Daun Pintu Unit 75,000 0
Hebel 10cm dudukan kusen M2 135,000 0

21 Angin-angin BV.01 = 2 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV 3 lubang M1 120,000 0
Asesoris BV Set 125,000 0

22 Angin-angin BV.02 = 1 Unit


Kusen Aluminium 4", Powder Coat M1 97,000 0
Kaca Rayben 5MM M2 90,000 0
Frame BV M1 120,000 0
Asesoris BV Set 125,000 0

23 Pekerjaan Rangka Aluminium dan Kaca Lot 126,737,575 0


24 Pintu Press Excellent Unit 1,400,000 0
25 Pintu Toilet WPC Excellent Unit 850,000 0

Page 57
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

26 Finish Melamik Pintu Press Excellent M2 95,000 0


27 Finish Duco Pintu Toilet M2 140,000 0
28 Asesoris Pemasangan Pintu (handle, engsel) ex Fino Kenari Jaya Set 850,000 0
29 Stel Pintu Unit 75,000 0

0
XII PEKERJAAN LISTRIK
A LISTRIK LT.1
1 Instalasi Titik Lampu Plafon, 2 x 1.5 MM Eterna Titik 145,000 0
2 Instalasi Titik Lampu Dinding, 2 x 1,5 MM Eterna Titik 145,000 0
3 Instalasi Titik Stop Kontak 2 x 1.5 MM Eterna Titik 145,000 0
4 Instalasi Saklar Hotel Titik 145,000 0
5 Instalasi Exhaust Fan 2 x 1.5 MM Eterna Titik 145,000 0
6 Instalasi Ceiling Fan 2 x 1.5 MM Eterna Titik 145,000 0
7 Unit Lampu Downlight Lengkap ex Lokal setara Bh 55,000 0
8 Unit Lampu Dinding Lengkap ex Lokal setara Bh 300,000 0
9 Unit Stop Kontak ex. Panasonic Bh 14,500 0
10 Unit Saklar Tunggal ex Panasonic Bh 12,000 0
11 Unit Saklar Ganda ex Panasonic BH 19,000 0
12 Unit Sklar Hotel ex Panasonic Bh 13,000 0
13 Unit Stop Kontak AC ex Panasonic Bh 55,000 0
14 Instalasi Kabel AC Lt.1 3 x 2.5 MM Eterna M1 13,500 0
untuk 10 Unit AC
15 Unit Ex Haust Fan Bh 350,000 0
16 Unit Ceiling Fan Bh 250,000 0

1 Instalasi Titik Lampu Plafon, 2 x 1.5 MM Eterna Titik 145,000 0


2 Instalasi Titik Lampu Dinding, 2 x 1,5 MM Eterna Titik 145,000 0
3 Instalasi Titik Stop Kontak 2 x 1.5 MM Eterna Titik 145,000 0
4 Instalasi Saklar Hotel Titik 145,000 0
5 Instalasi Exhaust Fan 2 x 1.5 MM Eterna Titik 145,000 0
6 Instalasi Ceiling Fan 2 x 1.5 MM Eterna Titik 145,000 0
7 Unit Lampu Downlight Lengkap ex Lokal setara Bh 75,000 0
8 Unit Lampu Dinding Lengkap ex Lokal setara Bh 250,000 0
9 Unit Stop Kontak ex. Panasonic Bh 40,000 0
10 Unit Saklar Tunggal ex Panasonic Bh 25,000 0
11 Unit Saklar Ganda ex Panasonic BH 35,000 0
12 Unit Sklar Hotel ex Panasonic Bh 95,000 0
13 Unit Stop Kontak AC ex Panasonic Bh 80,000 0
14 Instalasi Kabel AC Lt.1 3 x 2.5 MM Eterna M1 21,000 0
untuk 10 Unit AC
15 Unit Ex Haust Fan Bh 450,000 0
16 Unit Ceiling Fan Bh 600,000 0

0
B LISTRIK LT.2

Page 58
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

1 Instalasi Titik Lampu Plafon, 2 x 1.5 MM Eterna Titik 145,000 0


2 Instalasi Titik Lampu Dinding, 2 x 1.5 MM Eterna Titik 145,000 0
3 Instalasi Titik Stop Kontak 2 x 1.5 MM Eterna Titik 145,000 0
4 Instalasi Saklar Hotel Titik 145,000 0
5 Instalasi Exhaust Fan 2 x 1.5 MM Eterna Titik 145,000 0
6 Instalasi Ceiling Fan 2 x 1.5 MM Eterna Titik 145,000 0
7 Unit Lampu Downlight Lengkap ex Lokal setara Bh 55,000 0
8 Unit Lampu Dinding Lengkap ex Lokal setara Bh 300,000 0
9 Unit Stop Kontak ex. Panasonic Bh 14,500 0
10 Unit Saklar Tunggal ex Panasonic Bh 12,000 0
11 Unit Saklar Ganda ex Panasonic BH 19,000 0
12 Unit Sklar Hotel ex Panasonic Bh 13,000 0
13 Unit Stop Kontak AC ex Panasonic Bh 55,000 0
14 Instalasi Kabel AC Lt.1 3 x 2.5 MM Eterna M1 13,500 0
untuk 14 Unit AC
15 Unit Ex Haust Fan Bh 350,000 0
16 Unit Ceiling Fan Bh 250,000 0

1 Instalasi Titik Lampu Plafon, 2 x 1.5 MM Eterna Titik 145,000 0


2 Instalasi Titik Lampu Dinding, 2 x 1.5 MM Eterna Titik 145,000 0
3 Instalasi Titik Stop Kontak 2 x 1.5 MM Eterna Titik 145,000 0
4 Instalasi Saklar Hotel Titik 145,000 0
5 Instalasi Exhaust Fan 2 x 1.5 MM Eterna Titik 145,000 0
6 Instalasi Ceiling Fan 2 x 1.5 MM Eterna Titik 145,000 0
7 Unit Lampu Downlight Lengkap ex Lokal setara Bh 75,000 0
8 Unit Lampu Dinding Lengkap ex Lokal setara Bh 300,000 0
9 Unit Stop Kontak ex. Panasonic Bh 40,000 0
10 Unit Saklar Tunggal ex Panasonic Bh 25,000 0
11 Unit Saklar Ganda ex Panasonic BH 35,000 0
12 Unit Sklar Hotel ex Panasonic Bh 95,000 0
13 Unit Stop Kontak AC ex Panasonic Bh 80,000 0
14 Instalasi Kabel AC Lt.1 3 x 2.5 MM Eterna M1 21,000 0
untuk 14 Unit AC
15 Unit Ex Haust Fan Bh 450,000 0
16 Unit Ceiling Fan Bh 600,000 0
0
B' LISTRIK LT. BASEMENT
1 Instalasi Titik Lampu Plafon, 2 x 1.5 MM Eterna Titik 145,000 0
2 Instalasi Titik Stop Kontak 2 x 1.5 MM Eterna Titik 145,000 0
3 Unit Lampu TL 1x36 Watt Lengkap ex Lokal setara Bh 75,000 0
4 Unit Stop Kontak ex. Panasonic Bh 40,000 0
5 Unit Saklar Ganda ex Panasonic BH 35,000 0
6 Unit Saklar Tunggal ex Panasonic Bh 25,000 0

Page 59
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

C PANEL UTAMA DIRUANG GENERATOR


1 Box Panel uk. 60 x 80 Bh 380,000 0
2 Volt Meter BH 75,000 0
3 Ampere Meter BH 75,000 0
4 Hz Meter Bh 150,000 0
5 NFB Merlin Gerin Bh 1,500,000 0
7 Asesoris Ls 300,000 0
8 Instalasi Panel Unit 450,000 0
9 Instalasi Kabel Toefur 4 x 35 MM Eterna ke Panel Lt.1 M1 190,000 0
10 Instalasi Kabel Toefur 4 x 35 MM Eterna ke Panel Lt.2 M1 190,000 0
11 Penarikan Daya Listrik dari Tiang PLN ke Meter (by others) Ls 0 0
12 Generator kapasitas min. 7,700 Watt (optional) Unit 0 0

1 Box Panel uk. 60 x 80 Bh 4,250,000 0


2 Volt Meter BH 750,000 0
3 Ampere Meter BH 750,000 0
4 Hz Meter Bh 750,000 0
5 NFB Merlin Gerin Bh 850,000 0
7 Asesoris Ls 1,250,000 0
8 Instalasi Panel Unit 1,750,000 0
9 Instalasi Kabel Toefur 4 x 35 MM Eterna ke Panel Lt.1 M1 290,000 0
10 Instalasi Kabel Toefur 4 x 35 MM Eterna ke Panel Lt.2 M1 290,000 0
11 Penarikan Daya Listrik dari Tiang PLN ke Meter (by others) Ls 0
12 Generator kapasitas min. 7,700 Watt (optional) Unit 0

0
D PANEL LISTRIK LT.1
1 Box Panel uk. 60 x 80 Bh 380,000 0
2 MCB Bh 55,000 0
3 Volt Meter BH 75,000 0
4 Ampere Meter BH 75,000 0
5 Hz Meter Bh 150,000 0
6 NFB Merlin Gerin Bh 1,500,000 0
7 Sisir Konektor Bh 150,000 0
8 Asesoris Ls 300,000 0
9 Instalasi Panel Unit 450,000 0

1 Box Panel uk. 60 x 80 Bh 4,250,000 0


2 MCB Bh 55,000 0
3 Volt Meter BH 750,000 0
4 Ampere Meter BH 750,000 0
5 Hz Meter Bh 750,000 0
6 NFB Merlin Gerin Bh 850,000 0
7 Sisir Konektor Bh 65,000 0
8 Asesoris Ls 1,250,000 0
9 Instalasi Panel Unit 1,750,000 0

Page 60
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

0
E PANEL LISTRIK LT.2
1 Box Panel uk. 60 x 80 Bh 380,000 0
2 MCB Bh 55,000 0
3 Volt Meter BH 75,000 0
4 Ampere Meter BH 75,000 0
5 Hz Meter Bh 150,000 0
6 NFB Merlin Gerin Bh 1,500,000 0
7 Sisir Konektor Bh 150,000 0
8 Asesoris Ls 300,000 0
9 Instalasi Panel Unit 450,000 0

1 Box Panel uk. 60 x 80 Bh 4,250,000 0


2 MCB Bh 55,000 0
3 Volt Meter BH 750,000 0
4 Ampere Meter BH 750,000 0
5 Hz Meter Bh 750,000 0
6 NFB Merlin Gerin Bh 850,000 0
7 Sisir Konektor Bh 65,000 0
8 Asesoris Ls 1,250,000 0
9 Instalasi Panel Unit 1,750,000 0

0
F FIRE ALARM LANTAI 1
1 Control Panel 5-10 Zone + Instalasi Unit 8,780,000 0
2 Smoke Detektor + Instalasi Unit 510,000 0
3 ROR Het Detektor + Instalasi Unit 310,000 0
4 Indikator Lampu Alarm + Instalasi Unit 210,000 0
5 Fire Alarm Bell + Instalasi Unit 410,000 0
6 Break Glass + Instalasi Unit 385,000 0

0
G FIRE ALARM LANTAI 2
1 Smoke Detektor + Instalasi Unit 510,000 0
2 ROR Het Detektor + Instalasi Unit 310,000 0
3 Indikator Lampu Alarm + Instalasi Unit 210,000 0
4 Fire Alarm Bell + Instalasi Unit 410,000 0
5 Break Glass + Instalasi Unit 385,000 0

0
H PEMASANGAN RAK KABEL TRAY
1 Rak Kabel Tre LT.1 M' 175,000 0
2 Rak Kabel Tre LT.2 M' 175,000 0

Page 61
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

I PEMASANGAN SOUND SYSTEM


1 Sound Speaker Ceiling LT.1 + Instalasi Unit 600,000 0
2 Sound Speaker Ceiling LT.2 + Instalasi Unit 600,000 0
3 Power Ampli Fier ZA 2120 ( 120 Watt ) Unit 2,000,000 0
4 EQualizer DBX seri 1231 Unit 5,500,000 0
5 Stabilizer 600 Watt Servo EX Kenika Unit 600,000 0
6 Volume Control + Instalasi Unit 200,000 0

0
XIII PEKERJAAN PENANGKAL PETIR ELEKTRIK
1 BC Kg 67,500 0
2 Pipa Galvanis Btg 650,000 0
3 Sped Bh 7,750,000 0
4 PVC Btg 20,000 0
5 Begel Bh 35,000 0
6 Klem Bh 7,500 0
7 Skrup + Fischer Pack 45,000 0
8 Alat bantu Ls 350,000 0
9 Grounding Titik 1,750,000 0
10 Pemasangan Unit 1,775,000 0

0
XIV TELEPHONE DAN CABLE DATA
1 Instalasi Kabel Telephone Lt.1 Titik 145,000 0
2 Instalasi Kabel Telephone Lt.2 Titik 145,000 0
3 Unit Outlet telephone Lt.1 dan 2 Bh 42,500 0
4 Instalasi Cable Data Lt.1 Utama Titik 145,000 0
5 Instalasi Cable Data Lt.2 Utama Titik 145,000 0
6 Unit Outlet Cable Data Lt.1 dan Lt.2 Bh 65,000 0
- Key telephone, PABX dll by others
- Penarikan cable data ke Unit dan pengadaan peralatan by others

1 Instalasi Kabel Telephone Lt.1 Titik 175,000 0


2 Instalasi Kabel Telephone Lt.2 Titik 175,000 0
3 Unit Outlet telephone Lt.1 dan 2 Bh 85,000 0
4 Instalasi Cable Data Lt.1 Utama Titik 625,000 0
5 Instalasi Cable Data Lt.2 Utama Titik 625,000 0
6 Unit Outlet Cable Data Lt.1 dan Lt.2 Bh 175,000 0
- Key telephone, PABX dll by others
- Penarikan cable data ke Unit dan pengadaan peralatan by others

0
XV PEKERJAAN TATA UDARA AC
1 Unit AC Lt. 1, 1 PK ex Panasonic atau setara Unit 2,800,000 0
2 Unit AC Lt. 1, 2 PK ex Panasonic atau setara Unit 4,000,000 0
3 Unit AC Lt. 2, 1 PK ex Panasonic atau setara Unit 2,800,000 0

Page 62
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

4 Unit AC Lt. 2, 2 PK ex Panasonic atau setara Unit 4,000,000 0


5 Instalasi Pipa tembaga untuk 10 unit AC Lt 1 M1 50,000 0
6 Instalasi Pipa tembaga untuk 14 unit AC Lt 2 M1 50,000 0
7 InstalAsi Bracket AC dan Acesoris untuk 24 Unit AC Lot 2,400,000 0
8 Instalasi dan Unit Ex Haust Fan dan Ceiling Fan masuk - 0 0
di Pekerjaan Listrik
9 Instalasi Power dan Kabel AC masuk di Pek. Listrik - 0 0

1 Unit AC Lt. 1, 0,5 PK ex Panasonic atau setara Unit 2,500,000 0


2 Unit AC Lt. 1, 1 PK ex Panasonic atau setara Unit 2,800,000 0
3 Unit AC Lt. 1, 1,5 PK ex Panasonic atau setara Unit 4,300,000 0
4 Unit AC Lt. 1, 2 PK ex Panasonic atau setara Unit 4,900,000 0
5 Unit AC Lt. 2, 3/4 PK ex Panasonic atau setara Unit 2,675,000 0
5 Unit AC Lt. 2, 1 PK ex Panasonic atau setara Unit 2,800,000 0
3 Unit AC Lt. 2, 1,5 PK ex Panasonic atau setara Unit 4,300,000 0
6 Unit AC Lt. 2, 2 PK ex Panasonic atau setara Unit 4,900,000 0
6 Unit AC Cassette Lt. 2, 2 PK ex Panasonic atau setara Unit 14,500,000 0
7 Instalasi Pipa tembaga untuk 12 unit AC Lt 1 M1 85,000 0
8 Instalasi Pipa tembaga untuk 15 unit AC Lt 2 M1 85,000 0
8 Instalasi Pipa tembaga untuk 2 unit AC Cassette Lt 2 M1 175,000 0
9 Instalasi Bracket AC dan Acesoris untuk 27 Unit AC Lot 2,700,000 0

0
XVI PEKERJAAN AIR BERSIH DAN SANITASI
A AIR BERSIH DAN AIR KOTOR TOILET
1 Instalasi Pipa dia. 4" AW M1 60,000 0
2 Instalasi Pipa dia. 3" AW M1 35,000 0
3 Instalasi Pipa dia. 2" AW M1 20,000 0
4 Instalasi Pipa dia. 1.5" AW distribusi sumur ke tangki M1 15,000 0
5 Instalasi Pipa dia. 1", 3/4". 1/2" AW ke titik Kran, Closet, dll Ls 1,500,000 0
6 Asesoris Penyambungan Tee, Sock, Knee dll Ls 750,000 0
7 Kran-kran Luar termasuk di atap beton Bh 25,000 0
8 Pompa Distribusi dari Sumur ke Tangki Air di Atap Dak Unit 1,500,000 0
9 Pompa Tendang distribusi dari Tangki ke Toilet Unit 450,000 0
10 Tangki Air Fibre kapasitas 1,000 lt Bh 750,000 0
11 Asesoris Instalasi Pompa dan Tangki Air Ls 350,000 0

1 Instalasi Pipa dia. 4" AW M1 72,610 0


2 Instalasi Pipa dia. 3" AW M1 56,410 0
3 Instalasi Pipa dia. 2" AW M1 44,160 0
4 Instalasi Pipa dia. 1.5" AW distribusi sumur ke tangki M1 27,590 0
5 Instalasi Pipa dia. 1", 3/4". 1/2" AW ke titik Kran, Closet, dll Ls 1,247,500 0
6 Asesoris Penyambungan Tee, Sock, Knee dll Ls 1,500,000 0
7 Kran-kran Luar termasuk di atap beton Bh 85,000 0
8 Pompa Distribusi dari Sumur ke Tangki Air di Atap Dak Unit 4,500,000 0
9 Pompa Tendang distribusi dari Tangki ke Toilet Unit 650,000 0

Page 63
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

10 Tangki Air Fibre kapasitas 1,000 lt Bh 1,450,000 0


11 Asesoris Instalasi Pompa dan Tangki Air Ls 450,000 0

0
B SALURAN TERTUTUP DAN TERBUKA
1 Saluran tertutup menyebrang ke jalan depan dia. 40 cm M1 175,000 0
termasuk perbaikan aspal kembali
2 Saluran tertutup Bus Beton dia. 40 cm dinding Selatan M1 75,000 0
3 Bak Kontrol untuk Saluran Tertutup Bh 150,000 0

1 Saluran tertutup menyebrang ke jalan depan dia. 40 cm M1 175,000 0


termasuk perbaikan aspal kembali
2 Saluran tertutup Bus Beton dia. 40 cm dinding Selatan M1 145,000 0
3 Bak Kontrol untuk Saluran Tertutup Bh 287,810 0

0
C SEPTICK TANK DAN PERESAPAN
1 Sumur Resapan Air Hujan, bus beton dia. 80 cm dalam 2M Titik 750,000 0
2 Sumur Resapan KM, bus beton dia. 80 cm dalam 3M Titik 1,500,000 0
3 Septick Tank beton bertulang 1,5 x 2,5 M dalam 2 M Unit 1,750,000 0

1 Sumur Resapan Air Hujan, bus beton dia. 100 cm dalam 2,5M Titik 1,347,366 0
2 Perpipaan Penghubung peresapan air hujan Dia. 4 inc M1 72,610 0
3 Bak kontrol ( sumpit ) 3x1,5x1,5 M Unit 1,500,000 0
4 Inlet Resapan air lantai basement melingkar kolom (bak kontrol) Unit 510,625 0
5 Sumur Resapan KM, bus beton dia. 80 cm dalam 3M Titik 1,800,000 0
6 Perpipaan Penghubung Septicktank ke peresapan air kotor Dia. 4 inc M1 110,435 0
7 Perpipaan dari Toilet ke Septicktank air kotor Dia. 4 inc M1 110,435 0
9 Septick Tank beton bertulang 1,5 x 2,5 M dalam 2 M M3 2,000,000 0
10 Pas Bata 1/2 Bt selimut Septick Tank M2 103,020 0

0
D INSTALASI AIR HUJAN DARI ATAP
1 Pipa PVC Aw Dia. 4 Inc ( Lantai 2- Basement ) M' 110,435 0
2 Roof Drain Atas Bh 170,000 0

0
XVII PEKERJAAN PANTRY
1 Meja Pantry Beton t=7cm M1 350,000 0
2 Penutup Keramik Meja Pantry M2 111,645 0
3 Kitchen Set termasuk sink M1 2,900,000 0

1 Meja Beton Pantry L=60cm M1 350,000 0


2 Keramik dinding pantry M2 120,000 0
3 Keramik Meja Pantry M2 120,000 0
4 Asesories Sink dan Kran Cuci Set 3,000,000 0

Page 64
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

0
XVIII PEKERJAAN TEMPAT WUDHU, JANITOR & TOILET
A TOILET LT.1
1 Pas. Keramik Dinding Toilet uk. 20/25 ex Roman M2 90,000 0
2 Pas. Keramik Lantai Toilet uk. 30/30 ex Roman M2 90,000 0
3 Pas. Keramik Janitor uk. 20/20 ex Roman M2 75,000 0
4 Closet Duduk terpasang ex Lokal Unit 1,500,000 0
5 Wastafel terpasang ex Lokal Unit 450,000 0
6 Urinoir terpasang ex Lokal Unit 900,000 0
7 Floor drain Toilet dan Janitor terpasang Bh 75,000 0
8 Cermin terpasang uk. 80x120cm Set 175,000 0
9 Kran Shower Set 275,000 0
10 Jet Spray Closet Set 60,000 0
11 Kran Biasa Set 45,000 0
12 Instalasi Asesoris Toilet Ls 500,000 0
13 Waterproofing Lantai Toilet M2 25,000 0

1 Keramik Dinding Toilet Terpilih ex Roman M2 120,000 0


2 Lantai Toilet terpilih ex Roman M2 120,000 0
3 List Toilet ex Roman M1 50,000 0
4 Closet Duduk terpasang ex ORIN Unit 1,500,000 0
5 Closet Jongkok dengan flush ex TOTO Unit 2,450,000 0
6 Wastafel terpasang ex ORIN Unit 1,500,000 0
7 Meja Wastafel Gantung lapis Keramik Marble Unit 1,500,000 0
8 Urinoir terpasang ex ORIN Unit 1,250,000 0
9 Floor drain Toilet dan Janitor terpasang Bh 95,000 0
10 Cermin terpasang uk. 80x120cm Set 450,000 0
11 Jet Spray Closet Set 151,000 0
12 Kran Biasa Set 175,000 0
13 Kran Wastafel Set 275,000 0
14 Instalasi Asesoris Toilet Ls 1,000,000 0
15 Waterproofing Lantai Toilet M2 40,000 0

0
B TOILET LT. 2
1 Pas. Keramik Dinding Toilet uk. 20/25 ex Roman M2 90,000 0
2 Pas. Keramik Lantai Toilet uk. 30/30 ex Roman M2 90,000 0
3 Closet Duduk terpasang ex Lokal Unit 1,500,000 0
4 Wastafel terpasang ex Lokal Unit 450,000 0
5 Urinoir terpasang ex Lokal Unit 900,000 0
6 Floor drain Toilet Bh 75,000 0
7 Cermin terpasang uk. 80x120cm Set 175,000 0
8 Kran Shower Set 275,000 0
9 Jet Spray Closet Set 60,000 0
10 Kran Biasa Set 45,000 0

Page 65
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

11 Instalasi Asesoris Toilet Ls 500,000 0


12 Waterproofing Lantai Toilet M2 25,000 0

1 Keramik Dinding Toilet Terpilih ex Roman M2 120,000 0


2 Lantai Toilet terpilih ex Roman M2 120,000 0
3 List Toilet ex Roman M1 50,000 0
4 Closet Duduk terpasang ex ORIN Unit 1,500,000 0
5 Wastafel terpasang ex ORIN Unit 1,500,000 0
6 Meja Wastafel Gantung lapis Keramik Marble Unit 1,500,000 0
7 Urinoir terpasang ex ORIN Unit 1,250,000 0
8 Floor drain Toilet Bh 95,000 0
9 Cermin terpasang uk. 80x120cm Set 450,000 0
10 Kran Shower Set 275,000 0
11 Jet Spray Closet Set 151,000 0
12 Kran Biasa Set 175,000 0
13 Kran Wastafel Set 275,000 0
14 Instalasi Asesoris Toilet Ls 1,000,000 0
15 Waterproofing Lantai Toilet M2 40,000 0

0
C TOILET DIREKSI
1 Pas. Keramik Dinding Toilet uk. 20/25 ex Roman setara M2 90,000
2 Pas. Keramik Lantai Toilet uk. 30/30 ex Roman setara M2 90,000
3 Closet Duduk terpasang ex Lokal Unit 1,500,000
4 Wastafel terpasang ex Lokal Unit 450,000
5 Floor drain Toilet Bh 75,000
6 Cermin terpasang uk. 80x120cm Set 175,000
7 Kran Shower Set 275,000
8 Jet Spray Closet Set 60,000
9 Kran Biasa Set 45,000
10 Instalasi Asesoris Toilet Ls 250,000
11 Waterproofing Lantai Toilet M2 25,000

1 Keramik Dinding Toilet Terpilih ex Roman M2 120,000 0


2 Lantai Toilet terpilih ex Roman M2 120,000 0
3 List Toilet ex Roman M1 50,000 0
4 Closet Duduk terpasang ex Orin/TOTO Monoblock Unit 3,500,000 0
5 Wastafel terpasang ex ORIN Unit 1,500,000 0
6 Meja Wastafel Gantung lapis Keramik Marble Unit 1,500,000 0
7 Floor drain Toilet Bh 95,000 0
8 Cermin terpasang uk. 80x120cm Set 450,000 0
9 Kran Shower Set 275,000 0
10 Jet Spray Closet Set 151,000 0
11 Kran Biasa Set 175,000 0
12 Kran Wastafel Set 275,000 0
13 Instalasi Asesoris Toilet Ls 250,000 0

Page 66
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

14 Waterproofing Lantai Toilet M2 40,000 0

0
D TEMPAT WUDHU
1 Tanggulan Tempat Wudhu M1 75,000
2 Pas. Keramik Dinding uk. 20/25 ex Roman setara M2 90,000
3 Pas. Keramik Lantai uk. 20/25 ex Roman setara M2 90,000
4 Kran Wudhu Set 45,000
5 Floor drain Bh 75,000
6 Instalasi Asesoris tempat wudhu Ls 250,000
7 Cermin terpasang uk. 80x120cm Unit 175,000
8 Pas. Dinding pembatas dg tempat sholat 3 x 1,5 M2 M2 85,000
9 Waterproofing Lantai Wudhu M2 25,000

1 Tanggulan Tempat Wudhu M1 75,000 0


2 Pas. Keramik Dinding uk. 20/25 ex Roman setara M2 120,000 0
3 Pas. Keramik Lantai uk. 20/25 ex Roman setara M2 120,000 0
4 Kran Wudhu Set 175,000 0
5 Floor drain Bh 95,000 0
6 Instalasi Asesoris tempat wudhu Ls 250,000 0
7 Cermin terpasang uk. 80x120cm Unit 450,000 0
8 Pas. Dinding pembatas dg tempat sholat 3 x 1,5 M2 M2 135,000 0
9 Waterproofing Lantai Wudhu M2 40,000 0

0
XIX PEKERJAAN PAGAR KELILING
1 Pas. Pagar Batu Bata diatas Pondasi Batu Kali Pagar Bumi M2 70,000
t=300 cm , diplester aci luar dalam, p=136M1
2 Sloof beton uk 15/25 p=150,8M1 M3 2,250,000
3 Kolom Beton 10/20 t = 300 cm, per jarak 400 cm, 38 klm M3 2,250,000
4 Ring Balk Beton 10/20 p=136M1 M3 2,250,000
5 Pengecatan Pagar sisi dalam t=300 cm M1 45,000

1 Pas. Pagar Batu Bata diatas Pondasi Batu Kali Pagar Bumi M2 125,000 0
t=300 cm , diplester aci luar dalam, p=136M1
2 Sloof beton uk 15/25 p=150,8M1 M3 2,335,250 0
3 Kolom Beton 10/20 t = 300 cm, per jarak 400 cm, 38 klm M3 2,093,000 0
4 Ring Balk Beton 10/20 p=136M1 M3 2,335,250 0
5 Pengecatan Pagar sisi dalam t=300 cm M1 25,945 0

0
XX PEKERJAAN PERKERASAN HALAMAN LUAR
1 Perataan Tanah Untuk Paving Block M2 5,000 0
2 Hamparan pasir untuk dasar paving block t = 5 cm, L=400M2 M3 90,000 0
3 Paving Block area Parkir dan Jalan masuk M2 75,000 0

Page 67
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

A Paving Jalan Arah Basement


1 Perataan dan Perkerasan Tanah M2 5,000 0
2 Hamparan pasir dan sirtu dasar paving t = 12cm, L=130M2 M3 90,000 0
3 Paving Block terpasang berpola M2 150,000 0

0
B Paving Jalan Menurun
1 Perataan dan Perkerasan Tanah M2 5,000 0
2 Hamparan pasir dan sirtu dasar paving t = 12cm, L=97,2M2 M3 90,000 0
3 Paving Block terpasang berpola M2 150,000 0

0
C Paving Jalan Ke Depan Sisi Selatan Samping Direksi Keet
1 Perataan dan Perkerasan Tanah M2 5,000 0
2 Hamparan pasir dan sirtu dasar paving t = 12cm, L=160M2 M3 90,000 0
3 Paving Block terpasang berpola M2 150,000 0

0
D Paving Area Direksi Keet
1 Perataan dan Perkerasan Tanah M2 5,000 0
2 Hamparan pasir dan sirtu dasar paving t = 12cm, L=277M2 M3 90,000 0
3 Paving Block terpasang berpola M2 150,000 0

0
E Paving Area Halaman GSB Depan 10M
1 Perataan dan Perkerasan Tanah M2 5,000 0
2 Hamparan pasir dan sirtu dasar paving t = 12cm, L=102M2 M3 90,000 0
3 Paving Block terpasang berpola M2 150,000 0

0
XXI PEKERJAAN TAMAN
A TAMAN DALAM
1 Taman Ruang Direksi M2 750,000 0
2 Taman Ruang Tamu Direksi M2 750,000 0
3 Taman Bawah Tangga Utama M2 500,000 0
4 Taman Ruang Staff Ahli 4 ruang @ 1x3 M2 M2 750,000 0

0
B TAMAN LUAR
1 Gazebo Ruang Parkir Depan dari Bahan Kayu Glugu 2,5x2,5 M2 Unit 15,000,000
2 Taman sekitar Gazebo 5x6 M2 M2 250,000
3 Taman Dinding Depan Pintu Utama 6x5 M2 M2 250,000

Depan Entrance Depan dan Kolam Hydrant


Gazebo Glugu 2,5 x 2,5 M2 Unit 15,000,000 0
Taman Dinding Utara 6 x 8 M2 M2 250,000 0

Page 68
NO Nama Pekerjaan Sat Vol Harga Sat Jumlah Total

Kolam Hydrant 5 x 8 x 1 M1 beton bertulang tebal 10 cm M3 2,000,000 0


Taman Keliling Kolam M1 250,000 0
Galian Tanah kolam hydrant M3 35,000 0

0
C TERAS ENTRANCE UTAMA DIATAS KOLAM HYDRANT
1 Galian Pondasi M3 35,000 0
2 Urug Pasir Bawah Pondasi Foot Plate 1,5 x 1,5 x 0,05 x 4 titik M3 90,000 0
3 Pekerjaan Pondasi Batu Kali tumpuan Pondasi Footplate F1 M3 300,000 0
uk. 150cm x 150 cm t= 400 cm jumlah 4 Titik
4 Beton Footplate 150x150x30 cm x 4 titik M3 1,950,320 0
5 Beton Tie Beam 25/40 x 15,60 M1 M3 2,780,000 0
6 Beton Kolom 40/45cm x 400cm x 4 titik M3 3,508,995 0
7 Pas Batu kali penahan tanah M3 300,000 0
8 Cor Plat Beton Teras 3 x 5 M2 tebal 12cm M3 2,558,305 0
9 Cor Beton Balok Teras 25x40 M3 3,412,215 0
10 Cor Plat Beton Jembatan 2 x 3 M2 tebal 12cm M3 2,558,305 0
11 Cor Balok Jembatan 25x40 M3 3,412,215 0
12 Pasangan keramik Teras Entrance Niro Granit 60x60 M2 350,000 0
13 Pasangan keramik lantai jembatan Niro Granit 60x60 M2 350,000 0
14 Railing Teras dan Jembatan M1 350,000 0

Page 69
Catatan

Tidak ada

Page 70
Catatan

Page 71
Catatan

Page 72
Catatan

Page 73
Catatan

Page 74
Catatan

Page 75
Catatan

Page 76
Catatan

Page 77
Catatan

Page 78
Catatan

Page 79
Catatan

Page 80
Catatan

Page 81
Catatan

Page 82
Catatan

Page 83
Catatan

Page 84
Catatan

Page 85
Catatan

Page 86
Catatan

Page 87
Catatan

Page 88
Catatan

Page 89
Catatan

Page 90
Catatan

Page 91
Catatan

Page 92
Catatan

Page 93
Catatan

Page 94
Catatan

Page 95
Catatan

Page 96
Catatan

Page 97

Anda mungkin juga menyukai