a b
A Dengan Septic tank
I Pekerjaan Pengukuran
II Pekerjaan Struktur
III Pekerjaan Arsitektur
IV Pekerjaan MEP
SUB TOTAL
TOTAL 50 UNIT
REKAPITULASI
IAYA RUMAH TAPAK DINDING TEMBOK TYPE 28 - KAB.
SURABAYA
Biaya
( Rp )
3,469,800.00
55,536,362.47
98,986,186.87
12,492,100.00
170,484,449.34
8,524,222,467.04
Unit : SATUAN KERJA PENYEDIAAN RUMAH KHUSUS ………
Kegiatan : PEMBANGUNAN RUMAH KHUSUS DI KAB.SURABAYA
Lokasi : SURABAYA
jumlah
Rp 5,000,000.00
Rp 19,047,600.00
Rp 14,394,000.00
Rp 2,500,000.00
Rp 4,500,000.00
Rp 10,000,000.00
Rp 500,000.00
Rp 3,000,000.00
Rp 58,941,600.00
RENCANA ANGGARAN BIAYA ( RAB )
RUMAH TAPAK DINDING TEMBOK TYPE 28 - KAB. SURAB
Lokasi : SURABAYA
2 3 4
I Pekerjaan Pengukuran
1 Pek. Pembersihan Lapangan & Perataan Ls 1.00
2 Pek. Pemasangan Bouwplank m' 27.00
II Pekerjaan Struktur
A Pekerjaan Tanah, Pondasi
1 Pek. Galian Pondasi m3 18.72
2 Pek. Urugan Pasir Bawah Pondasi m3 1.17
3 Pas. Batu Kosong m3 3.51
4 Pek. Pondasi Menerus Batu Kali, Spesi 1 Pc:4 Ps m3 10.26
5 Pek. Pasang Sloof 15/25,
Pek. Bekisting untuk 3 kali pakai m2 10.80
Pek. Pembesian kg 202.40
Pek. Beton Mutu K 175 m3 0.81
6 Pek. Urugan Tanah kembali yang dipadatkan m3 6.24
2 3 4
2 3 4
Pek. Pasang Pintu (PJ1) kusen klas I dan daun pintu panel
1 bh 1.00
kelas II beserta accessories
Pek. Pasang Pintu (P2) kusen klas I dan daun pintu panel kelas
2 bh 2.00
II beserta accessories
Pek. Pasang Pintu & Jendela (PJ1) kusen pintu jendela klas I
4 bh 1.00
dan daun pintu panel serta incl. accessories
D Pekerjaan Plesteran
1 Pekerjaan Plesteran Dinding 1 PC : 4 Ps, tebal 15 mm m2 239.77
2 Pekerjaan Acian Dinding m2 239.77
E Pekerjaan Pengecatan
Pek. Cat Tembok Luar dan Dalam (Cat Dasar, Car Penutup dan
1 m2 239.77
Plamur)
2 Pek. Cat Plafond (Cat Dasar, Car Penutup dan Plamur) m2 24.53
Pek. Cat Kayu ( Lisplank ) (Cat Dasar, Car Penutup, Cat Meni
3 m2 6.32
dan Plamur)
IV Pekerjaan MEP
A Pekerjaan Instalasi Listrik
No Uraian Pekerjaan Sat Vol
2 3 4
2 3 4
B Pekerjaan Plumbing
1 Instalasi air bersih pipa PVC dia 3/4" AW+ assesories m' 6.00
2 Kran air bh 1.00
3 Floor Drain Stainless bh 1.00
4 Pas. Closet Jongkok bh 1.00
5 Instalasi air kotor pipa PVC dia 3" D+ Assesories m' 3.00
6 Instalasi air kotoran pipa PVC dia 4" D+ Assesories m' 2.00
9 Pek. Pembuatan Septik Tank Unit 1.00
10 Biaya Penyambungan PDAM Ls 1.00
TOTAL
NA ANGGARAN BIAYA ( RAB )
DING TEMBOK TYPE 28 - KAB. SURABAYA
5 (4x5)
300,000.00 Rp 300,000.00
117,400.00 Rp 3,169,800.00
Rp 3,469,800.00
25,500.00 Rp 477,360.00
283,300.00 Rp 331,461.00
885,400.00 Rp 3,107,754.00
1,372,200.00 Rp 14,078,772.00
119,100.00 Rp 1,286,280.00
18,560.00 Rp 3,756,544.00
1,202,600.00 Rp 974,106.00
179,000.00 Rp 1,116,960.00
172,200.00 Rp 2,562,336.00
18,560.00 Rp 3,881,762.13
1,202,600.00 Rp 1,006,576.20
166,285.88 Rp 19,935,423.60
157,805.45 Rp 56,809.96
157,805.45 Rp 2,964,217.57
Biaya Satuan Jumlah Biaya
( Rp ) ( Rp )
5 (4x5)
Rp 55,536,362.47
1,066,200.00 Rp 1,611,897.15
283,300.00 Rp 856,594.38
89,900.00 Rp 804,370.36
386,600.00 Rp 8,895,395.38
328,900.00 Rp 499,516.88
367,300.00 Rp 1,325,953.00
Biaya Satuan Jumlah Biaya
( Rp ) ( Rp )
5 (4x5)
360,142.00 Rp 8,833,580.98
129,000.00 Rp 4,832,649.60
254,649.12 Rp 9,539,767.19
114,800.00 Rp 567,112.00
86,800.00 Rp 2,194,304.00
1,824,569.60 Rp 1,824,569.60
1,814,847.20 Rp 3,629,694.40
474,400.00 Rp 474,400.00
2,013,184.16 Rp 2,013,184.16
178,892.16 Rp 357,784.32
107,100.00 Rp 439,538.40
761,600.00 Rp 913,920.00
87,300.00 Rp 20,932,174.17
58,300.00 Rp 13,978,760.07
51,400.00 Rp 12,324,327.06
51,400.00 Rp 1,260,741.77
138,600.00 Rp 875,952.00
Rp 98,986,186.87
Biaya Satuan Jumlah Biaya
( Rp ) ( Rp )
5 (4x5)
252,700.00 Rp 1,768,900.00
280,100.00 Rp 840,300.00
43,000.00 Rp 129,000.00
66,600.00 Rp 133,200.00
37,400.00 Rp 112,200.00
247,500.00 Rp 247,500.00
76,000.00 Rp 532,000.00
1,218,100.00 Rp 1,218,100.00
Biaya Satuan Jumlah Biaya
( Rp ) ( Rp )
5 (4x5)
32,700.00 Rp 196,200.00
117,300.00 Rp 117,300.00
77,300.00 Rp 77,300.00
638,200.00 Rp 638,200.00
88,800.00 Rp 266,400.00
110,600.00 Rp 221,200.00
3,994,300.00 Rp 3,994,300.00
2,000,000.00 Rp 2,000,000.00
Rp 12,492,100.00
OTAL 170,484,449.34
Satuan Kerja : SATUAN KERJA PENYEDIAAN RUMAH KHUSUS ………
Kegiatan : PEMBANGUNAN RUMAH KHUSUS DI KAB.SURABAYA
Lokasi : SURABAYA
2 Pekerjaan Drainase
Galian tanah m3 783.36 25,500
Urugan Pasir m3 48.96 283,300
Pas. Batu Belah / Kali m3 489.60 1,372,200
Plester m2 2,448.00 87,300
jumlah
30,892,400.00
588,792,960.00
19,975,680.00
13,870,368.00
671,829,120.00
213,710,400.00
489,600.00
339,960.00
4,422,000.00
371,107.20
Rp 1,544,693,595.20
Copy Sheet ini Ke File Anda
Sesuaikan sel yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda
a Sheet anda
0 10028189000
1 Satu
2 Dua 10 Milyaran
3 Tiga Sembilan Ribu 028 Jutaan
4 Empat Delapan Puluh 189 Ribuan
5 Lima Seratus 000 Ratusan
6 Enam Delapan Juta
7 Tujuh Dua Puluh
8 Delapan
9 Sembilan Milyar
Sepuluh
10028189000
No Pekerjaan Panjang Lebar Tinggi
Pekerjaan Bowplank 13 14
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
Besi 12 36.00
Besi 10 0.50
B Pekerjaan Dinding
Besi 12 37.20
Besi 10 0.50
C Pekerjaan Lantai
1 Urugan Tanah Ex. Galian
Kamar Tidur 3.00 2.54 0.30
Rg. Tamu, Keluarga, Rg. Makan,Dapur & KM/WC 4.09 3.07 0.30
Teras Depan 1.27 1.00 0.25
Teras Belakang 1.20 1.00 0.25
TOTAL
2 Urugan Pasir
Kamar Tidur 3.00 2.54 0.10
Rg. Tamu, Keluarga, Rg. Makan,Dapur & KM/WC 4.09 3.07 0.10
Teras Depan 1.27 1.00 0.10
Teras Belakang 1.20 1.00 0.10
TOTAL
3 Pekerjaan Rabat 5 cm
Kamar Tidur 3.00 2.54 0.05
Rg. Tamu, Keluarga, Rg. Makan,Dapur & KM/WC 4.09 3.07 0.05
Teras Depan 1.27 1.00 0.05
Teras Belakang 1.20 1.00 0.05
TOTAL
4 Keramik lantai 30 x 30
Kamar Tidur 3.00 2.54
Rg. Tamu, Keluarga, Rg. Makan & Dapur 2.74 1.95
Teras Belakang 1.20 1.00
Teras Depan 1.27 1.00
TOTAL
5 Keramik 20 x 20 KM
Km/Wc 1.35 1.13
TOTAL
7 Keramik 20 x 25 KM
Km/Wc 4.94 1.00
Pintu KM 0.70 1.90
TOTAL
TOTAL
2 Pas. Atap Genteng Metal Zincalume + Rangka Baja Ringan
1 5.42 2.47
2 6.42 3.75
TOTAL
Kaca
Jendela J1 0.48 1.12
27.00
27.00
1.00 18.72
18.72
1.00 1.17
1.17
1.00 3.51
3.51
1.00 10.26
10.26
1.00 0.81
0.81
2.00 10.80
4.00 128.40
240.00 74.00
12.00 0.84
8.00 14.88
4.00 132.68
248.00 76.47
2.00 3.73
1.00 1.31
5.04
1.00 111.60
4.00 19.04
1.00 2.67
1.00 3.56
2.00 3.77
1.00 1.33
2.00 3.27
1.00 0.29
20.00 1.20
13.42
119.89
2.00 10.15
1.00 0.36
2.00 4.87
4.00 13.92
18.78
2.00 4.56
1.00 3.77
1.00 0.32
1.00 0.30
-
8.95
2.00 1.52
1.00 1.26
1.00 0.13
1.00 0.12
-
-
3.02
2.00 0.76
1.00 0.63
1.00 0.06
1.00 0.06
-
-
1.51
2.00 15.21
1.00 5.33
1.00 1.20
1.00 1.27
-
-
23.01
1.00 1.52
1.52
2.45
-
-
2.45
1.00 4.94
1.00 1.33
-
3.61
2.00 15.21
1.00 5.33
1.00 1.52
1.00 1.20
1.00 1.27
2.00 -
2.00 -
-
-
24.53
1.00 13.39
1.00 24.08
37.46
2.00 12.84
2.00 12.44
25.28
1.00 7.00
1.00 5.05
3.00 11.40
-
23.45
1.00 2.00
18.00 9.50
1.00 0.94
-
1.00 0.15
6.00 3.23
1.00 0.37
Total 3.60
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
A. PEKERJAAN PERSIAPAN
A Bahan
1 Kayu Kelas III (Kaso 5/7) M3 0.012
2 Papan Kayu Kelas III M3 0.007
3 Paku 5 - 12 cm Kg 0.050
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 0.010
2 Tukang Kayu OH 0.101
3 Kepala Tukang Kayu OH 0.040
4 Mandor OH 0.010
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
PEMBERSIHAN LAPANGAN / M2
A Bahan
1
2
Dibulatka
B. PEKERJAAN TANAH
A Bahan
Dibulatka
A Bahan
Dibulatka
PEMADATAN TANAH (Per 20 Cm) / M3
A Bahan
Dibulatka
A Bahan
1 Pasir Urug M3 1.200
Dibulatka
C. PEKERJAAN PONDASI
A Bahan
1 Batu Belah 15 - 20 Cm M3 1.200
2 Portland Cement (PC) ZAK 2.720
3 Pasir Pasang (PP) M3 0.544
Dibulatka
D. PEKERJAAN BETON
A Bahan
1 Portland Cement (PC) zak 5.750
2 Pasir Beton (PB) M3 0.558
3 Kerikil max 30 mm (KR) M3 0.540
4 Air Liter 215.000
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 0.201
2 Tukang Batu OH 1.211
3 Kepala Tukang OH 0.020
4 Mandor OH 0.020
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
A Bahan / 10 kg
1 Besi Beton Kg 1.050
2 Kawat Beton Kg 0.150
Dibulatka
E. PEKERJAAN DINDING
A Bahan
1 HB 10 Buah 12.500
2 Portland Cement (PC) zak 0.531
3 Pasir Pasang (PP) M3 0.093
4 Besi Angkur dia 8 mm Kg 0.280
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 0.605
2 Tukang Batu OH 0.201
3 Kepala Tukang OH 0.020
4 Mandor OH 0.020
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
F. PEKERJAAN PLESTERAN
A Bahan
1 Portland Cement (PC) zak 0.125
2 Pasir Pasang (PP) M3 0.024
Dibulatka
ACIAN / M2
A Bahan
1 Portland Cement (PC) zak 0.065
Dibulatka
G. PEKERJAAN KAYU
A Bahan
1 Papan Kayu Klas II M3 0.040
2 Lem Kayu Kg 0.500
Dibulatka
MEMBUAT DAN MEMASANG DAUN PINTU KAYU LAPIS (PLYWOOD) RANGKAP, RANGKA EXPO
KAYU KLAS I (Lebar sampai 90 cm) / M2
A Bahan
1 Papan Kayu Klas I M3 0.025
2 Paku 1 - 2,5 cm Kg 0.030
3 Lem Kayu Kg 0.500
4 Plywood 4 mm (90 x 220) cm Lembar 1.000
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 1.000
2 Tukang Kayu OH 3.026
3 Kepala Tukang OH 0.302
4 Mandor OH 0.302
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
MEMBUAT DAN MEMASANG RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KLAS II / M2
A Bahan
1 Kaso 5/7 M3 0.0163
2 Paku 7 - 10 cm Kg 0.250
Dibulatka
A Bahan
1 Papan Kayu Klas II M3 0.011
2 Paku 5 - 7 cm Kg 0.050
Dibulatka
H. PEKERJAAN LANTAI
LANTAI KERAMIK UKURAN (30 X 30) CM / M2
A Bahan
1 Ubin Keramik m2 1.050
2 Portland Cement (PC) Kg 10.000
3 Pasir Pasang (PP) M3 0.045
4 Semen Warna Kg 0.500
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 0.700
2 Tukang Batu OH 0.350
3 Kepala Tukang OH 0.035
4 Mandor OH 0.035
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
A Bahan
1 Ubin Keramik Doos 1.050
2 Portland Cement (PC) Kg 10.400
3 Pasir Pasang (PP) M3 0.045
4 Semen Warna Kg 0.500
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 0.700
2 Tukang Batu OH 0.350
3 Kepala Tukang OH 0.035
4 Mandor OH 0.035
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
A Bahan
1 Genteng Metal KW I Buah 1.300
2 Paku Biasa Kg 0.200
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 0.200
2 Tukang Kayu OH 0.100
3 Kepala Tukang OH 0.010
4 Mandor OH 0.001
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
A Bahan
1 Nok Genteng Metal KW I BH 1.100
2 Paku Biasa Kg 0.050
Dibulatka
A Bahan
1 Tripleks 3 mm Lembar 0.390
2 Paku Tripleks Kg 0.030
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 0.100
2 Tukang Kayu OH 0.100
3 Kepala Tukang OH 0.010
4 Mandor OH 0.005
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
A Bahan
1 Kloset Jongkok Teraso Bh 1.000
2 Portland Cement (PC) Kg 6.000
3 Pasir Pasang (PP) M3 0.010
4 Bata Merah Buah 7.000
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 1.000
2 Tukang Batu OH 1.500
3 Kepala Tukang OH 0.150
4 Mandor OH 0.050
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
A Bahan
1 Pipa PVC 1/2" M 1.200
2 Perlengkapan Ls 0.350
Dibulatka
MEMASANG PIPA PVC, DIAMETER 3/4" / M
A Bahan
1 Pipa PVC 3/4" M 1.200
2 Perlengkapan Ls 0.350
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 0.036
2 Tukang Batu OH 0.060
3 Kepala Tukang OH 0.006
4 Mandor OH 0.0020
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
A Bahan
1 Pipa PVC 3" M 1.200
2 Perlengkapan Ls 0.350
Dibulatka
A Bahan
1 Pipa PVC 4" M 1.200
2 Perlengkapan Ls 0.350
A Bahan
1 Bak Cuci Stainless Steel 1 Lobang Unit 1.000
2 Waterdrain Buah 1.000
Dibulatka
A Bahan
1 Kran Air 1/2" Bh 1.000
2 Seal Tape Bh 0.025
Dibulatka
A Bahan
1 Floor Drain Bh 1.000
Dibulatka
N. PEKERJAAN PENGECATAN
PENGECATAN BIDANG KAYU BARU 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTU
A Bahan
1 Cat Meni Kg 0.200
2 Plamur Kg 0.150
3 Cat Dasar Kg 0.170
4 Cat Penutup Kg 0.260
PENGECATAN TEMBOK BARU 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP / M
A Bahan
1 Plamur Kg 0.100
2 Cat Dasar Kg 0.100
3 Cat Penutup Kg 0.260
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 0.020
2 Tukang Cat OH 0.063
3 Kepala Tukang OH 0.0063
4 Mandor OH 0.0030
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
O. PEKERJAAN ELEKTRIKAL
A Bahan
1 Pipa Listrik 5/8" btg 3.0
2 Kabel M' 24.0
3 T Dus Buah 3.0
4 L Bow Buah 4.0
5 Las Dop Buah 3.0
6 Klem Buah 24.0
7 Mangkok Buah 1.0
8 Saklar Buah 1.0
9 Fitting Buah 1.0
10 Upah Instalasi Ls 1.0
Jumlah Harg
Overhead & Profit 10
Dibulatka
A Bahan
1 Kabel Distribusi, Tipe NYM 3 x 2.5 mm² M' 15.0
2 Konduit PVC High Impact f 20 mm² M' 15.0
3 Flexible Connection f 20 mm² M' 1.0
4 Shock PVC High Impact f 20 mm² Pcs 3.0
5 Clamp Pcs 8.0
6 Teedos High Impact f 20 mm² Pcs 1.0
7 Lastdop Pcs 2.0
8 Pitser & Stapping Pcs 6.0
9 Upah Instalasi Ls 1.0
Jumlah Harg
Overhead & Profit 10
Dibulatka
Jumlah Harg
Overhead & Profit 10
Dibulatka
SAKLAR TUNGGAL / BH
A Bahan
1 Frame + Saklar 1 Gang, 1 Way Buah 1.0
2 Inbouwdoos Buah 1.0
3 Upah Pasang Ls 1.0
Jumlah Harg
Overhead & Profit 10
Dibulatka
SAKLAR GANDA / BH
A Bahan
1 Frame + Saklar 2 Gang, 1 Way Buah 1.0
2 Inbouwdoos Buah 1.0
Jumlah Harg
Overhead & Profit 10
Dibulatka
SAKLAR TRIPLE / BH
A Bahan
1 Frame + Saklar 3 Gang, 1 Way Buah 1.0
2 Inbouwdoos Buah 1.0
3 Upah Pasang Ls 1.0
Jumlah Harg
Overhead & Profit 10
Dibulatka
LAMPU 15 W / BH
A Bahan
1 Armature, Fitting, Holder Set 1.0
2 Lampu Bohlam 15 W Buah 1.0
3 Mur, Paku, Isolasi serta aksesoris penunjang Lot 1.0
4 Upah Pasang Ls 1.0
Jumlah Harg
Overhead & Profit 10
Dibulatka
MCB BOX / BH
NO. KEBUTUHAN SAT UNIT
A Tenaga
1 Upah % 100
B Bahan
1 Pipa Listrik 5/8" Btg 3
2 Kabel m 15
3 T Dus Buah 1
4 L Bow Buah 2
5 Klem Biasa Buah 24
6 MCB Buah 1
Jumlah Harg
Overhead & Profit 10
Dibulatka
Panel Listrik Tenaga Surya / BH
A Bahan
1 Panel Listrik Tenaga Surya/ BH Set 1.0
2 Mur, Paku, Isolasi serta aksesoris penunjang Lot 1.0
3 Upah Pasang Ls 1.0
Jumlah Harg
Overhead & Profit 10
Dibulatka
A Bahan
1 Batere Kering/ BH Set 1.0
2 Mur, Paku, Isolasi serta aksesoris penunjang Lot 1.0
3 Upah Pasang Ls 1.0
Jumlah Harg
Overhead & Profit 10
Dibulatka
Lampu PJUTS/Bh
A Bahan
1 Lampu PJUTS/Bh + Tiang 6m Set 1.0
2 Mur, Paku, Isolasi serta aksesoris penunjang Lot 1.0
3 Upah Pasang Ls 1.0
Jumlah Harg
Overhead & Profit 10
Dibulatka
Jumlah Harg
Overhead & Profit 10
Dibulatka
Pemadatan Sirtu
MEMASANG 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG METAL
Harga Satuan
No Uraian Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.2000 145,000.00
Tukang Besi OH 0.4500 156,000.00
Kepala Tukang OH 0.0100 171,000.00
Mandor OH 0.0500 171,000.00
JUMLAH TENAGA KERJA
B BAHAN
C-75,0.8 m' 1.4880 11,000.00
C-75, 0.6 m' 2.2320 8,000.00
Baut Bh 28.0000 2,140.00
Dynabolt Bh 1.6000 2,247.00
Reng m' 5.4000 4,500.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.2970 145,000.00
Tukang Batu OH 0.0330 156,000.00
Tukang Kayu OH 0.0330 156,000.00
Tukang Besi OH 0.0330 156,000.00
Kepala Tukang OH 0.0100 171,000.00
Mandor OH 0.0150 171,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III m3 0.0030 4,188,000.00
Paku 5 cm-12 cm kg 0.0200 29,100.00
Minyak Bekisting liter 0.1000 30,100.00
Besi Beton Polos kg 3.6000 13,500.00
Kawat Beton kg 0.0500 26,900.00
Semen Portland kg 5.5000 1,454.00
Pasir Beton m3 0.0090 272,500.00
Kerikil m3 0.0150 275,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Harga Satuan
No Uraian Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.1800 145,000.00
Tukang Batu OH 0.0200 156,000.00
Tukang Kayu OH 0.0200 156,000.00
Tukang Besi OH 0.0200 156,000.00
Kepala Tukang OH 0.0060 171,000.00
Mandor OH 0.0090 171,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III m3 0.0020 4,188,000.00
Paku 5 cm-12 cm kg 0.0100 29,100.00
Minyak Bekisting liter
Besi Beton Polos kg 3.0000 13,500.00
Kawat Beton kg 0.4500 26,900.00
Semen Portland kg 4.0000 1,454.00
Pasir Beton m3 0.0060 272,500.00
Kerikil m3 0.0090 275,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A Bahan
1 Kaca Tebal 3 mm m2 1.100
2 Sealant Kg 0.050
Dibulatka
A Bahan
1 Kalsiboard 3.5 mm lbr 0.364
2 Paku Skrup bh 8
Dibulatka
A Bahan
1 Rangka metal hollow m' 4.000
2 Assesoris Ls 100%xRangka
Dibulatka
MEMBUAT SEPTIKTANK (Sesuai dgn Gambar)
A Bahan
1 Galian Tanah Biasa M3 3.413
2 Pasangan Batu Bata M2 11.500
3 Plesteran M2 10.210
4 Beton Bertulang
Beton m3 0.228
tulangan kg 18.700
Bekisting m2 0.610
5 Kerikil Saringan M3 0.040
6 Batu Kali M3 0.040
7 Pasir Saringan M3 0.040
8 Pipa PVC 4" M' 0.400
9 Ijuk Saringan Kg 0.040
Dibulatka
A Bahan
1 Gorong-gorong d=80 cm Bh 1.000
Dibulatka
A Bahan
1 Bata Berongga Buah 30.000
2 Semen Portland Kg 14.000
3 Pasir Pasang m3 0.032
Jumlah Harga Bahan (
B Tenaga Kerja
1 Pekerja OH 0.300
2 Tukang Batu OH 0.100
3 Kepala Tukang OH 0.0100
4 Mandor OH 0.0150
Jumlah Harga Tenaga Kerja (
Jumlah Harga Bahan dan Tenaga Kerja (A+
Overhead & Profit 10
Dibulatka
A Bahan
1 Semen Pc Kg 4.320
2 Pasir Pasang Kg 0.006
Rp 4,188,000.00 Rp 50,256.00
Rp 4,188,000.00 Rp 29,316.00
Rp 29,100.00 Rp 1,455.00
Jumlah Harga Bahan (A) Rp 81,027.00
Rp 145,000.00 Rp 1,450.00
Rp 156,000.00 Rp 15,724.80
Rp 171,000.00 Rp 6,840.00
Rp 171,000.00 Rp 1,710.00
Jumlah Harga Tenaga Kerja (B) Rp 25,724.80
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 106,751.80
Overhead & Profit 10% Rp 10,675.18
Total Rp 117,426.98
Dibulatkan Rp 117,400.00
Rp -
Rp -
Rp 145,000.00 Rp 14,639.60
Rp 171,000.00 Rp 8,619.80
Rp 145,000.00 Rp 14,639.20
Rp 171,000.00 Rp 8,619.80
Rp 145,000.00 Rp 73,196.00
Rp 171,000.00 Rp 8,618.40
Rp 145,000.00 Rp 72,500.00
Rp 171,000.00 Rp 8,550.00
Rp 177,000.00 Rp 212,400.00
Rp 145,000.00 Rp 43,500.00
Rp 171,000.00 Rp 1,710.00
Rp 451,000.00 Rp 541,200.00
Rp 72,700.00 Rp 197,744.00
Rp 272,500.00 Rp 148,240.00
Rp 145,000.00 Rp 217,500.00
Rp 156,000.00 Rp 117,000.00
Rp 171,000.00 Rp 12,927.60
Rp 171,000.00 Rp 12,927.60
Jumlah Harga Tenaga Kerja (B) Rp 360,355.20
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 1,247,539.20
Overhead & Profit 10% Rp 124,753.92
Total Rp 1,372,293.12
Dibulatkan Rp 1,372,200.00
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
Rp 72,700.00 Rp 418,025.00
Rp 272,500.00 Rp 152,055.00
Rp 275,000.00 Rp 148,500.00
Rp 120.00 Rp 25,800.00
Jumlah Harga Bahan (A) Rp 744,380.00
Rp 145,000.00 Rp 29,174.00
Rp 156,000.00 Rp 188,916.00
Rp 171,000.00 Rp 3,420.00
Rp 171,000.00 Rp 3,420.00
Jumlah Harga Tenaga Kerja (B) Rp 224,930.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 969,310.00
Overhead & Profit 10% Rp 96,931.00
Total Rp 1,066,241.00
Dibulatkan Rp 1,066,200.00
Rp 15,000.00 Rp 15,750.00
Rp 20,000.00 Rp 3,000.00
Rp 70,000.00 Rp 490.00
Rp 85,000.00 Rp 5,950.00
Rp 95,000.00 Rp 66.50
Rp 75,000.00 Rp 52.50
Jumlah Harga Tenaga Kerja (B) Rp 6,559.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) / 10 kg Rp 25,309.00
Jumlah Harga Bahan dan Tenaga Kerja / kg Rp 2,530.90
Overhead & Profit 10% Rp 253.09
Total Rp 2,783.99
Dibulatkan Rp 2,700.00
Rp 5,000.00 Rp 62,500.00
Rp 72,700.00 Rp 38,603.70
Rp 250,000.00 Rp 23,250.00
Rp 15,000.00 Rp 4,200.00
Jumlah Harga Bahan (A) Rp 128,553.70
Rp 70,000.00 Rp 42,350.00
Rp 85,000.00 Rp 17,085.00
Rp 95,000.00 Rp 1,900.00
Rp 75,000.00 Rp 1,500.00
Jumlah Harga Tenaga Kerja (B) Rp 62,835.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 191,388.70
Overhead & Profit 10% Rp 19,138.87
Total Rp 210,527.57
Dibulatkan Rp 210,500.00
Rp 1,454.00 Rp 181.46
Rp 272,500.00 Rp 6,540.00
Rp 145,000.00 Rp 43,919.05
Rp 156,000.00 Rp 23,602.80
Rp 171,000.00 Rp 2,585.52
Rp 171,000.00 Rp 2,565.00
Jumlah Harga Tenaga Kerja (B) Rp 72,672.37
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 79,393.83
Overhead & Profit 10% Rp 7,939.38
Total Rp 87,333.21
Dibulatkan Rp 87,300.00
Rp 72,700.00 Rp 4,725.50
Rp 145,000.00 Rp 29,275.50
Rp 156,000.00 Rp 15,600.00
Rp 171,000.00 Rp 1,710.00
Rp 171,000.00 Rp 1,710.00
Jumlah Harga Tenaga Kerja (B) Rp 48,295.50
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 53,021.00
Overhead & Profit 10% Rp 5,302.10
Total Rp 58,323.10
Dibulatkan Rp 58,300.00
Rp 1,349,994.00 Rp 53,999.76
Rp 122,500.00 Rp 61,250.00
Rp 4,000,000.00 Rp 100,000.00
Rp 28,900.00 Rp 867.00
Rp 122,500.00 Rp 61,250.00
Rp 105,000.00 Rp 105,000.00
Jumlah Harga Bahan (A) Rp 267,117.00
Rp 145,000.00 Rp 145,000.00
Rp 156,000.00 Rp 472,056.00
Rp 171,000.00 Rp 51,710.40
Rp 171,000.00 Rp 51,710.40
Jumlah Harga Tenaga Kerja (B) Rp 720,476.80
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 987,593.80
Overhead & Profit 10% Rp 98,759.38
Total Rp 1,086,353.18
Dibulatkan Rp 1,086,300.00
Rp 2,000,000.00 Rp 32,600.00
Rp 55,000.00 Rp 13,750.00
Rp 145,000.00 Rp 21,953.00
Rp 156,000.00 Rp 39,343.20
Rp 171,000.00 Rp 9,849.60
Rp 171,000.00 Rp 9,849.60
Jumlah Harga Tenaga Kerja (B) Rp 80,995.40
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 127,345.40
Overhead & Profit 10% Rp 12,734.54
Total Rp 140,079.94
Dibulatkan Rp 140,000.00
Rp 2,500,000.00 Rp 27,500.00
Rp 29,100.00 Rp 1,455.00
Rp 145,000.00 Rp 14,500.00
Rp 156,000.00 Rp 31,200.00
Rp 171,000.00 Rp 3,420.00
Rp 171,000.00 Rp 855.00
Jumlah Harga Tenaga Kerja (B) Rp 49,975.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 78,930.00
Overhead & Profit 10% Rp 7,893.00
Total Rp 86,823.00
Dibulatkan Rp 86,800.00
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
Rp 141,500.00 Rp 148,575.00
Rp 1,454.00 Rp 14,540.00
Rp 272,500.00 Rp 12,262.50
Rp 16,067.00 Rp 8,033.50
Jumlah Harga Bahan (A) Rp 183,411.00
Rp 145,000.00 Rp 101,500.00
Rp 156,000.00 Rp 54,600.00
Rp 171,000.00 Rp 5,985.00
Rp 171,000.00 Rp 5,985.00
Jumlah Harga Tenaga Kerja (B) Rp 168,070.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 351,481.00
Overhead & Profit 10% Rp 35,148.10
Total Rp 386,629.10
Dibulatkan Rp 386,600.00
Rp 91,000.00 Rp 95,550.00
Rp 1,454.00 Rp 15,121.60
Rp 272,500.00 Rp 12,262.50
Rp 16,067.00 Rp 8,033.50
Jumlah Harga Bahan (A) Rp 130,967.60
Rp 145,000.00 Rp 101,500.00
Rp 156,000.00 Rp 54,600.00
Rp 171,000.00 Rp 5,985.00
Rp 171,000.00 Rp 5,985.00
Jumlah Harga Tenaga Kerja (B) Rp 168,070.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 299,037.60
Overhead & Profit 10% Rp 29,903.76
Total Rp 328,941.36
Dibulatkan Rp 328,900.00
Rp 50,000.00 Rp 65,000.00
Rp 29,100.00 Rp 5,820.00
Jumlah Harga Bahan (A) Rp 70,820.00
Rp 145,000.00 Rp 29,000.00
Rp 156,000.00 Rp 15,600.00
Rp 171,000.00 Rp 1,710.00
Rp 171,000.00 Rp 171.00
Jumlah Harga Tenaga Kerja (B) Rp 46,481.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 117,301.00
Overhead & Profit 10% Rp 11,730.10
Total Rp 129,031.10
Dibulatkan Rp 129,000.00
Rp 35,000.00 Rp 38,500.00
Rp 29,100.00 Rp 1,455.00
Rp 145,000.00 Rp 36,250.00
Rp 156,000.00 Rp 23,400.00
Rp 171,000.00 Rp 2,565.00
Rp 171,000.00 Rp 2,223.00
Jumlah Harga Tenaga Kerja (B) Rp 64,438.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 104,393.00
Overhead & Profit 10% Rp 10,439.30
Total Rp 114,832.30
Dibulatkan Rp 114,800.00
Rp 64,000.00 Rp 24,960.00
Rp 55,000.00 Rp 1,650.00
Jumlah Harga Bahan (A) Rp 26,610.00
Rp 145,000.00 Rp 14,500.00
Rp 156,000.00 Rp 15,600.00
Rp 171,000.00 Rp 1,710.00
Rp 171,000.00 Rp 855.00
Jumlah Harga Tenaga Kerja (B) Rp 32,665.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 59,275.00
Overhead & Profit 10% Rp 5,927.50
Total Rp 65,202.50
Dibulatkan Rp 65,200.00
Rp 150,000.00 Rp 150,000.00
Rp 1,454.00 Rp 8,724.00
Rp 272,500.00 Rp 2,725.00
Rp 800.00 Rp 5,600.00
Jumlah Harga Bahan (A) Rp 167,049.00
Rp 145,000.00 Rp 145,000.00
Rp 156,000.00 Rp 234,000.00
Rp 171,000.00 Rp 25,650.00
Rp 171,000.00 Rp 8,550.00
Jumlah Harga Tenaga Kerja (B) Rp 413,200.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 580,249.00
Overhead & Profit 10% Rp 58,024.90
Total Rp 638,273.90
Dibulatkan Rp 638,200.00
Rp 32,000.00 Rp 38,400.00
Rp 9,500.00 Rp 3,325.00
Rp 145,000.00 Rp 5,220.00
Rp 156,000.00 Rp 9,360.00
Rp 171,000.00 Rp 1,026.00
Rp 171,000.00 Rp 342.00
Jumlah Harga Tenaga Kerja (B) Rp 15,948.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 57,673.00
Overhead & Profit 10% Rp 5,767.30
Total Rp 63,440.30
Dibulatkan Rp 63,400.00
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
Rp 8,000.00 Rp 9,600.00
Rp 12,000.00 Rp 4,200.00
Jumlah Harga Bahan (A) Rp 13,800.00
Rp 145,000.00 Rp 5,220.00
Rp 156,000.00 Rp 9,360.00
Rp 171,000.00 Rp 1,026.00
Rp 171,000.00 Rp 342.00
Jumlah Harga Tenaga Kerja (B) Rp 15,948.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 29,748.00
Overhead & Profit 10% Rp 2,974.80
Total Rp 32,722.80
Dibulatkan Rp 32,700.00
Rp 17,758.25 Rp 21,309.90
Rp 67,500.00 Rp 23,625.00
Rp 145,000.00 Rp 11,745.00
Rp 156,000.00 Rp 21,060.00
Rp 171,000.00 Rp 2,308.50
Rp 171,000.00 Rp 684.00
Jumlah Harga Tenaga Kerja (B) Rp 35,797.50
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 80,732.40
Overhead & Profit 10% Rp 8,073.24
Total Rp 88,805.64
Dibulatkan Rp 88,800.00
Rp 22,983.25 Rp 27,579.90
Rp 106,250.00 Rp 37,187.50
Rp 145,000.00 Rp 11,745.00
Rp 156,000.00 Rp 21,060.00
Rp 171,000.00 Rp 2,308.50
Rp 171,000.00 Rp 684.00
Jumlah Harga Tenaga Kerja (B) Rp 35,797.50
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 100,564.90
Overhead & Profit 10% Rp 10,056.49
Total Rp 110,621.39
Dibulatkan Rp 110,600.00
Rp 396,000.00 Rp 396,000.00
Rp 30,000.00 Rp 30,000.00
Rp 145,000.00 Rp 4,350.00
Rp 156,000.00 Rp 46,800.00
Rp 171,000.00 Rp 5,130.00
Rp 171,000.00 Rp 2,565.00
Jumlah Harga Tenaga Kerja (B) Rp 58,845.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 484,845.00
Overhead & Profit 10% Rp 48,484.50
Total Rp 533,329.50
Dibulatkan Rp 533,300.00
Rp 35,000.00 Rp 35,000.00
Rp 5,000.00 Rp 125.00
Rp 145,000.00 Rp 1,450.00
Rp 156,000.00 Rp 62,400.00
Rp 171,000.00 Rp 6,840.00
Rp 171,000.00 Rp 855.00
Jumlah Harga Tenaga Kerja (B) Rp 71,545.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 106,670.00
Overhead & Profit 10% Rp 10,667.00
Total Rp 117,337.00
Dibulatkan Rp 117,300.00
Rp 50,667.00 Rp 50,667.00
Rp 145,000.00 Rp 1,450.00
Rp 156,000.00 Rp 15,600.00
Rp 171,000.00 Rp 1,710.00
Rp 171,000.00 Rp 855.00
Jumlah Harga Tenaga Kerja (B) Rp 19,615.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 70,282.00
Overhead & Profit 10% Rp 7,028.20
Total Rp 77,310.20
Dibulatkan Rp 77,300.00
Rp 132,833.00 Rp 26,566.60
Rp 19,320.00 Rp 2,898.00
Rp 157,668.00 Rp 26,803.56
Rp 218,025.00 Rp 56,686.50
Rp 145,000.00 Rp 10,150.00
Rp 156,000.00 Rp 1,404.00
Rp 171,000.00 Rp 1,026.00
Rp 171,000.00 Rp 513.00
Jumlah Harga Tenaga Kerja (B) Rp 13,093.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 126,047.66
Overhead & Profit 10% Rp 12,604.77
Total Rp 138,652.43
Dibulatkan Rp 138,600.00
Rp 60,000.00 Rp 6,000.00
Rp 218,025.00 Rp 21,802.50
Rp 18,000.00 Rp 4,680.00
Jumlah Harga Bahan (A) Rp 32,482.50
Rp 145,000.00 Rp 2,900.00
Rp 156,000.00 Rp 9,828.00
Rp 171,000.00 Rp 1,077.30
Rp 171,000.00 Rp 513.00
Jumlah Harga Tenaga Kerja (B) Rp 14,318.30
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 46,800.80
Overhead & Profit 10% Rp 4,680.08
Total Rp 51,480.88
Dibulatkan Rp 51,400.00
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
5000 Rp 15,000.00
3500 Rp 84,000.00
3000 Rp 9,000.00
Rp 10 Rp 40.00
Rp 275 Rp 825.00
Rp 750 Rp 18,000.00
Rp 500 Rp 500.00
Rp 32,450 Rp 32,450.00
Rp 20,000 Rp 20,000.00
Rp 50,000 Rp 50,000.00
5,000 Rp 75,000.00
3,500 Rp 52,500.00
3,000 Rp 3,000.00
10 Rp 30.00
750 Rp 6,000.00
275 Rp 275.00
32,450 Rp 64,900.00
500 Rp 3,000.00
50,000 Rp 50,000.00
32,450 Rp 32,450.00
2,700 Rp 2,700.00
4,000 Rp 4,000.00
51,900 Rp 51,900.00
2,700 Rp 2,700.00
6,000 Rp 6,000.00
36,500 Rp 36,500.00
2,700 Rp 2,700.00
10,000 Rp 10,000.00
Jumlah Harga Rp 49,200.00
Overhead & Profit 10% Rp 4,920.00
Total Rp 54,120.00
Dibulatkan Rp 54,100.00
25,000 Rp 25,000.00
35,667 Rp 35,667.00
3,500 Rp 3,500.00
5,000 Rp 5,000.00
5000 5000
5000 15000
11,600.00 174000
3000 3000
40 80
750 18000
10,000 10000
17,466,200 Rp 17,466,200.00
45,500 Rp 45,500.00
15,500 Rp 15,500.00
5,200,000 Rp 5,200,000.00
13,500 Rp 13,500.00
7,500 Rp 7,500.00
17,790,000 Rp 17,790,000.00
13,500 Rp 13,500.00
7,500 Rp 7,500.00
Jumlah Harga
(Rp)
43,500.00
15,600.00
1,710.00
2,565.00
63,375.00
56,000.00
20,893.98
10,900.00
87,793.98
-
151,168.98
15,116.90
166,285.88
Jumlah Harga
(Rp)
29,000.00
70,200.00
1,710.00
8,550.00
109,460.00
16,368.00
17,856.00
59,920.00
3,595.20
24,300.00
122,039.20
-
231,499.20
23,149.92
254,649.12
Jumlah Harga
(Rp)
43,065.00
5,148.00
5,148.00
5,148.00
1,710.00
2,565.00
62,784.00
12,564.00
582.00
3,010.00
48,600.00
1,345.00
7,997.00
2,452.50
4,125.00
80,675.50
-
143,459.50
14,345.95
157,805.45
Jumlah Harga
(Rp)
26,100.00
3,120.00
3,120.00
3,120.00
1,026.00
1,539.00
38,025.00
8,376.00
291.00
-
40,500.00
12,105.00
5,816.00
1,635.00
2,475.00
71,198.00
-
109,223.00
10,922.30
120,145.30
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
Rp 61,500.00 Rp 67,650.00
Rp 29,295.00 Rp 1,464.75
Rp 145,000.00 Rp 2,175.00
Rp 156,000.00 Rp 23,400.00
Rp 171,000.00 Rp 2,565.00
Rp 171,000.00 Rp 136.80
Jumlah Harga Tenaga Kerja (B) Rp 28,276.80
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 97,391.55
Overhead & Profit 10% Rp 9,739.16
Total Rp 107,130.71
Dibulatkan Rp 107,100.00
Rp 74,750.00 Rp 27,209.00
Rp 8,100.00 Rp 64,800.00
Rp 145,000.00 Rp 14,500.00
Rp 156,000.00 Rp 7,800.00
Rp 171,000.00 Rp 855.00
Rp 171,000.00 Rp 855.00
Jumlah Harga Tenaga Kerja (B) Rp 24,010.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 116,019.00
Overhead & Profit 10% Rp 11,601.90
Total Rp 127,620.90
Dibulatkan Rp 127,600.00
Rp 95,000.00 Rp 380,000.00
Rp 95,000.00 Rp 95,000.00
Rp 145,000.00 Rp 50,750.00
Rp 156,000.00 Rp 54,600.00
Rp 171,000.00 Rp 5,985.00
Rp 171,000.00 Rp 3,078.00
Jumlah Harga Tenaga Kerja (B) Rp 114,413.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 589,413.00
Overhead & Profit 10% Rp 58,941.30
Total Rp 648,354.30
Dibulatkan Rp 648,300.00
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
Rp 25,500.00 Rp 87,018.75
Rp 166,285.88 Rp 1,912,287.60
Rp 87,300.00 Rp 891,333.00
Rp 1,202,600.00 Rp 273,591.50
Rp 18,560.00 Rp 347,072.00
Rp 119,100.00 Rp 72,651.00
Rp 208,333.33 Rp 8,333.33
Rp 451,000.00 Rp 18,040.00
Rp 272,500.00 Rp 10,900.00
Rp 22,983.25 Rp 9,193.30
Rp 20,000.00 Rp 800.00
Rp - Rp -
Rp 145,000.00 Rp 94,250.00
Rp 156,000.00 Rp 31,200.00
Rp 171,000.00 Rp 3,420.00
Rp 171,000.00 Rp 5,130.00
Jumlah Harga Tenaga Kerja (B) Rp 134,000.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 134,000.00
Overhead & Profit 10% Rp 13,400.00
Total Rp 147,400.00
Dibulatkan Rp 147,400.00
145,000.00 101,500.00
156,000.00 54,600.00
171,000.00 5,985.00
171,000.00 5,985.00
JUMLAH TENAGA KERJA 168,070.00
1,839.60 2,023.56
1,875.00 22,031.25
250,000.00 8,750.00
JUM.HARGA BAHAN 32,804.81
JUM.HARGA ALAT
200,874.81
20,087.48
220,962.29
145,000.00 101,500.00
156,000.00 54,600.00
171,000.00 5,985.00
171,000.00 5,985.00
JUMLAH TENAGA KERJA 168,070.00
12,264.00 13,490.40
1,875.00 22,031.25
250,000.00 8,750.00
JUM.HARGA BAHAN 44,271.65
JUM.HARGA ALAT
212,341.65
21,234.17
233,575.82
Rp 20,000.00 Rp 600,000.00
Rp 1,454.00 Rp 20,356.00
Rp 272,500.00 Rp 8,720.00
Jumlah Harga Bahan (A) Rp 629,076.00
Rp 145,000.00 Rp 43,500.00
Rp 156,000.00 Rp 15,600.00
Rp 171,000.00 Rp 1,710.00
Rp 171,000.00 Rp 2,565.00
Jumlah Harga Tenaga Kerja (B) Rp 63,375.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 692,451.00
Overhead & Profit 10% Rp 69,245.10
Total Rp 761,696.10
Dibulatkan Rp 761,600.00
Rp 1,875.00 Rp 8,100.00
Rp 250,000.00 Rp 1,500.00
Rp 145,000.00 Rp 43,500.00
Rp 156,000.00 Rp 15,600.00
Rp 171,000.00 Rp 1,710.00
Rp 171,000.00 Rp 2,565.00
Jumlah Harga Tenaga Kerja (B) Rp 63,375.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 72,975.00
Overhead & Profit 10% Rp 7,297.50
Total Rp 80,272.50
Dibulatkan Rp 80,200.00
PEMBUATAN DAN PEMASANGAN 1 M3 KUSEN PINTU DAN JENDELA, KAYU K
A Bahan
1 Balok Kayu M3 1.100
2 Paku 10 cm Kg 1.250
3 Lem Kayu Kg 1.000
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.800
2 Tukang Kayu OH 2.000
3 Kepala Tukang Kayu OH 0.200
4 Mandor OH 0.040
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
A Bahan
1 Papan Kayu M3 0.024
2 Lem Kayu Kg 0.300
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.800
2 Tukang Kayu OH 2.400
3 Kepala Tukang Kayu OH 0.240
4 Mandor OH 0.040
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
PEMBUATAN DAN PEMASANGAN 1 M2 PINTU & JENDELA JALUSI, KAYU KELA
A Bahan
1 Papan Kayu M3 0.064
2 Lem Kayu Kg 0.500
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 1.000
2 Tukang Kayu OH 3.000
3 Kepala Tukang Kayu OH 0.300
4 Mandor OH 0.050
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
A Bahan
1 Dolken Kayu Ø8-10 / 400cm Batang 1.250
2 Kayu M3 0.180
3 Paku Biasa Kg 0.080
4 Besi Strip Kg 1.100
5 Semen Portland Kg 35.000
A Bahan
1 Keramik m2 1.050
2 Semen Portland Kg 9.300
3 Pasir Pasang M3 0.018
4 Semen Warna Kg 1.940
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.900
3 Tukang Batu OH 0.450
4 Kepala Tukang OH 0.045
5 Mandor OH 0.045
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
A Bahan
1 Pipa PVC 2,5" M 1.200
2 Perlengkapan Ls 0.350
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.061
2 Tukang Batu OH 0.135
3 Kepala Tukang OH 0.0135
4 Mandor OH 0.0041
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
MEMASANG TALANG PVC PERSEGI / BH
A Bahan
1 Talang PVC Persegi Bh 1.000
2 Lem dan fiting Bh 0.025
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.010
2 Tukang Batu OH 0.100
3 Kepala Tukang OH 0.010
4 Mandor OH 0.005
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
MEMBUAT SEPTIKTANK KAPASITAS 3 M3 + RESAPAN / UNIT (Sesuai dgn Gam
NO. KEBUTUHAN SATUAN INDEKS
A Bahan
1 Galian Tanah Biasa M3 1.500
2 Pasangan Batako 1 : 4 M2 1.600
3 Bak Fiberglass Kapasitas 1 M3 Bh 1.000
4 Kerikil Saringan M3 1.750
5 Pasir Saringan M3 2.250
6 Pipa PVC 4" M' 4.000
7 Ijuk Saringan Kg 25.000
8 Penutup Septiktank kayu 2/20 M3 0.020
9 Upah Pasang Ls 1.000
Jumlah Harga
Overhead &
A Bahan
1 Dolken kayu Ø8-10 / 400cm Batang 1.700
2 Kayu M3 0.210
3 Paku Biasa Kg 0.300
4 Semen Portland Kg 10.500
5 Pasir Beton M3 0.030
6 Koral Beton M3 0.050
7 Seng Gelombang Lbr 1.500
8 Seng Plat Lbr 0.250
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 1.000
2 Tukang Kayu OH 2.000
3 Kepala Tukang OH 0.200
4 Mandor OH 0.050
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
MEMBUAT 1 M3 BETON MUTU f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/
NO. KEBUTUHAN SATUAN INDEKS
A Bahan
1 Semen Portland Kg 326.000
2 Pasir Beton m3 0.543
3 Kerikil m3 0.525
4 Air L 215.000
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 1.650
2 Tukang batu OH 0.275
3 Kepala Tukang OH 0.028
4 Mandor OH 0.083
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
A Bahan
1 Batu Belah M3 1.200
2 Pasir Urug M3 0.432
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.780
2 Tukang batu OH 0.390
3 Kepala Tukang OH 0.039
4 Mandor OH 0.039
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
A Bahan
1 Besi Beton Kg 10.500
2 Kawat Beton Kg 0.150
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.070
2 Tukang Besi OH 0.070
3 Kepala Tukang OH 0.007
4 Mandor OH 0.004
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.520
2 Tukang Kayu OH 0.260
3 Kepala Tukang OH 0.026
4 Mandor OH 0.026
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
A Bahan
1 Kayu Kelas 3 M3 0.040
2 Paku 5 cm - 10 cm Kg 0.400
3 Minyak Bekisting L 0.200
4 Balok Kayu Kelas 2 M3 0.015
5 Plywood tebal 9mm Lbr 0.350
6 Kayu Dolken diameter 8-10cm Batang 2.000
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.660
2 Tukang Kayu OH 0.330
3 Kepala Tukang OH 0.033
4 Mandor OH 0.033
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
A Bahan
1 Kayu Kelas 3 M3 0.040
2 Paku 5 cm - 10 cm Kg 0.400
3 Minyak Bekisting L 0.200
4 Balok Kayu Kelas 2 M3 0.018
5 Plywood tebal 9mm Lbr 0.350
6 Kayu Dolken diameter 8-10cm Batang 2.000
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.660
2 Tukang Kayu OH 0.330
3 Kepala Tukang OH 0.033
4 Mandor OH 0.033
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.300
2 Tukang Batu OH 0.100
3 Kepala Tukang OH 0.010
4 Mandor OH 0.015
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
A Bahan
1 Pintu PVC Unit 1.0
2 Upah Pasang Ls 1.0
Jum
Overhead &
A Bahan
1 Pasang Bak Cuci Ls 1.0
2 Pas. Dinding Bata 1PC : 4 PS M2 0.5
3 Pas. Meja Beton Bertulang M3 0.9
Jum
Overhead &
PEKERJAAN SUMUR DANGKAL
A Bahan
1 Pompa Air 450 W Unit 1.0
2 Upah Bor Ls 1.0
Jum
Overhead &
PEKERJAAN TANGKI AIR
A Bahan
1 Tangki Air 500 L Unit 1.0
2 Menara air Unit 1.0
3 Upah Pasang Ls 1.0
Jum
Overhead &
PEKERJAAN RESAPAN
A Bahan
1 Pek. Galian M3 1.9
2 Buis Beton Diameter 1 M Unit 4.0
3 Upah Pasang Ls 1.0
Jum
Overhead &
A Bahan
1 Pek. Galian M3 0.2
2 Pas. Batako M2 1.0
3 Pek. Plesteran m2 1.4
4 Pek. Acian M2 1.4
Jum
Overhead &
PEKERJAAN 1 M' JALAN BETON LEBAR 6 M
A Bahan
1 Pek. Pemadatan Tanah M2 6.0
2 Pek. Sirtu Urug M3 0.9
3 Pek. Beton K 175 M3 1.2
Jum
Overhead &
A Bahan
1 Sirtu M3 1.200
Jumlah Harg
B Tenaga Kerja
1 Pekerja OH 0.250
2 Mandor OH 0.025
Jumlah Harga Tena
Jumlah Harga Bahan dan Tenaga
Overhead &
A Bahan
1 Saklar Unit 1.0
2 Upah Pasang Ls 1.0
Jum
Overhead &
275
4780
Jml Harga Jml Harga
Bahan upah
Rp 66,667
Rp 17,500
Rp 1,875
Rp 66,667 Rp 19,375
TOTAL Rp 86,041.67
Overhead + Profit Rp 8,604.17
Jumlah A + B Rp 94,645.83
15.1725 8.6666666667
15.171 11.6666666667
30.3435
18.7096666667
PEMASANGAN 1 M3 KUSEN PINTU DAN JENDELA, KAYU KELAS I
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
Rp 4,000,000.00 Rp 4,400,000.00
Rp 29,100.00 Rp 36,375.00
Rp 122,500.00 Rp 122,500.00
Jumlah Harga Bahan (A) Rp 4,558,875.00
Rp 145,000.00 Rp 116,000.00
Rp 156,000.00 Rp 312,000.00
Rp 171,000.00 Rp 34,200.00
Rp 171,000.00 Rp 6,840.00
Jumlah Harga Tenaga Kerja (B) Rp 469,040.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 5,027,915.00
Overhead & Profit 10% Rp 502,791.50
Total Rp 5,530,706.50
Dibulatkan Rp 5,530,700.00
Rp 4,000,000.00 Rp 96,000.00
Rp 122,500.00 Rp 36,750.00
Jumlah Harga Bahan (A) Rp 132,750.00
Rp 145,000.00 Rp 116,000.00
Rp 156,000.00 Rp 374,400.00
Rp 171,000.00 Rp 41,040.00
Rp 171,000.00 Rp 6,840.00
Jumlah Harga Tenaga Kerja (B) Rp 538,280.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 671,030.00
Overhead & Profit 10% Rp 67,103.00
Total Rp 738,133.00
Dibulatkan Rp 738,100.00
PEMASANGAN 1 M2 PINTU & JENDELA JALUSI, KAYU KELAS I
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
Rp 4,000,000.00 Rp 256,000.00
Rp 122,500.00 Rp 61,250.00
Jumlah Harga Bahan (A) Rp 317,250.00
Rp 145,000.00 Rp 145,000.00
Rp 156,000.00 Rp 468,000.00
Rp 171,000.00 Rp 51,300.00
Rp 171,000.00 Rp 8,550.00
Jumlah Harga Tenaga Kerja (B) Rp 672,850.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 990,100.00
Overhead & Profit 10% Rp 99,010.00
Total Rp 1,089,110.00
Dibulatkan Rp 1,089,100.00
Rp 12,000.00 Rp 15,000.00
Rp 2,000,000.00 Rp 360,000.00
Rp 29,100.00 Rp 2,328.00
Rp 11,035.65 Rp 12,139.22
Rp 1,454.00 Rp 50,890.00
Rp 272,500.00 Rp 40,875.00
Rp 272,500.00 Rp 27,250.00
Rp 208,333.33 Rp 31,250.00
Rp 800.00 Rp 24,000.00
Rp 55,000.00 Rp 13,750.00
Rp 70,000.00 Rp 14,000.00
Rp 61,500.00 Rp 4,920.00
Rp 150,000.00 Rp 22,500.00
Rp 105,000.00 Rp 6,300.00
Jumlah Harga Bahan (A) Rp 625,202.22
Rp 145,000.00 Rp 290,000.00
Rp 156,000.00 Rp 312,000.00
Rp 156,000.00 Rp 156,000.00
Rp 171,000.00 Rp 51,300.00
Rp 171,000.00 Rp 8,550.00
Jumlah Harga Tenaga Kerja (B) Rp 817,850.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 1,443,052.22
Overhead & Profit 10% Rp 144,305.22
Total Rp 1,587,357.44
Dibulatkan Rp 1,587,300.00
Rp 65,000.00 Rp 68,250.00
Rp 1,454.00 Rp 13,522.20
Rp 272,500.00 Rp 4,905.00
Rp 16,067.00 Rp 31,169.98
Jumlah Harga Bahan (A) Rp 117,847.18
Rp 145,000.00 Rp 130,500.00
Rp 156,000.00 Rp 70,200.00
Rp 171,000.00 Rp 7,695.00
Rp 171,000.00 Rp 7,695.00
Jumlah Harga Tenaga Kerja (B) Rp 216,090.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 333,937.18
Overhead & Profit 10% Rp 33,393.72
Total Rp 367,330.90
Dibulatkan Rp 367,300.00
Rp 145,000.00 Rp 8,845.00
Rp 156,000.00 Rp 21,060.00
Rp 171,000.00 Rp 2,308.50
Rp 171,000.00 Rp 701.10
Jumlah Harga Tenaga Kerja (B) Rp 32,914.60
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 69,472.10
Overhead & Profit 10% Rp 6,947.21
Total Rp 76,419.31
Dibulatkan Rp 76,400.00
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
Rp 62,500.00 Rp 62,500.00
Rp 27,000.00 Rp 675.00
Rp 145,000.00 Rp 1,450.00
Rp 156,000.00 Rp 15,600.00
Rp 171,000.00 Rp 1,710.00
Rp 171,000.00 Rp 855.00
Jumlah Harga Tenaga Kerja (B) Rp 19,615.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 82,790.00
Overhead & Profit 10% Rp 8,279.00
Total Rp 91,069.00
Dibulatkan Rp 91,000.00
TANK KAPASITAS 3 M3 + RESAPAN / UNIT (Sesuai dgn Gambar)
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
Rp 25,500.00 Rp 38,250.00
Rp 210,500.00 Rp 336,800.00
Rp -
Rp 208,333.33 Rp 364,583.33
Rp 250,000.00 Rp 562,500.00
Rp 106,250.00 Rp 425,000.00
Rp 20,000.00 Rp 500,000.00
Rp 2,000,000.00 Rp 40,000.00
Rp 50,000.00 Rp 50,000.00
Rp 12,000.00 Rp 20,400.00
Rp 2,000,000.00 Rp 420,000.00
Rp 55,000.00 Rp 16,500.00
Rp 1,875.00 Rp 19,687.50
Rp 250,000.00 Rp 7,500.00
Rp 208,333.33 Rp 10,416.67
Rp 55,000.00 Rp 82,500.00
Rp 55,000.00 Rp 13,750.00
Rp 145,000.00 Rp 145,000.00
Rp 156,000.00 Rp 312,000.00
Rp 171,000.00 Rp 34,200.00
Rp 171,000.00 Rp 8,550.00
Jumlah Harga Tenaga Kerja (B) Rp 499,750.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 1,090,504.17
Overhead & Profit 10% Rp 109,050.42
Total Rp 1,199,554.58
Dibulatkan Rp 1,199,500.00
ETON MUTU f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
Rp 1,454.00 Rp 474,004.00
Rp 272,500.00 Rp 147,967.50
Rp 275,000.00 Rp 144,375.00
Rp 120.00 Rp 25,800.00
Rp 145,000.00 Rp 239,250.00
Rp 156,000.00 Rp 42,900.00
Rp 171,000.00 Rp 4,788.00
Rp 171,000.00 Rp 14,193.00
Jumlah Harga Tenaga Kerja (B) Rp 301,131.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 1,093,277.50
Overhead & Profit 10% Rp 109,327.75
Total Rp 1,202,605.25
Dibulatkan Rp 1,202,600.00
Rp 451,000.00 Rp 541,200.00
Rp 177,000.00 Rp 76,464.00
Jumlah Harga Bahan (A) Rp 617,664.00
Rp 145,000.00 Rp 113,100.00
Rp 156,000.00 Rp 60,840.00
Rp 171,000.00 Rp 6,669.00
Rp 171,000.00 Rp 6,669.00
Jumlah Harga Tenaga Kerja (B) Rp 187,278.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 804,942.00
Overhead & Profit 10% Rp 80,494.20
Total Rp 885,436.20
Dibulatkan Rp 885,400.00
Rp 13,500.00 Rp 141,750.00
Rp 26,900.00 Rp 4,035.00
Rp 145,000.00 Rp 10,150.00
Rp 156,000.00 Rp 10,920.00
Rp 171,000.00 Rp 1,197.00
Rp 171,000.00 Rp 684.00
Rp 4,188,000.00 Rp 188,460.00
Rp 29,100.00 Rp 8,730.00
Rp 30,100.00 Rp 3,010.00
Rp 145,000.00 Rp 75,400.00
Rp 156,000.00 Rp 40,560.00
Rp 171,000.00 Rp 4,446.00
Rp 171,000.00 Rp 4,446.00
Jumlah Harga Tenaga Kerja (B) Rp 124,852.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 325,052.00
Overhead & Profit 10% Rp 32,505.20
Total Rp 119,185.73
Dibulatkan Rp 119,100.00
HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )
Rp 4,188,000.00 Rp 167,520.00
Rp 29,100.00 Rp 11,640.00
Rp 30,100.00 Rp 6,020.00
Rp 4,355,500.00 Rp 65,332.50
Rp 105,000.00 Rp 36,750.00
Rp 12,000.00 Rp 24,000.00
Rp 145,000.00 Rp 95,700.00
Rp 156,000.00 Rp 51,480.00
Rp 171,000.00 Rp 5,643.00
Rp 171,000.00 Rp 5,643.00
Jumlah Harga Tenaga Kerja (B) Rp 158,466.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 469,728.50
Overhead & Profit 10% Rp 46,972.85
Total Rp 172,233.78
Dibulatkan Rp 172,200.00
Rp 2,000,000.00 Rp 80,000.00
Rp 55,000.00 Rp 22,000.00
Rp -
Rp 2,500,000.00 Rp 45,000.00
Rp 150,000.00 Rp 52,500.00
Rp 12,000.00 Rp 24,000.00
Rp 145,000.00 Rp 95,700.00
Rp 156,000.00 Rp 51,480.00
Rp 171,000.00 Rp 5,643.00
Rp 171,000.00 Rp 5,643.00
Jumlah Harga Tenaga Kerja (B) Rp 158,466.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 381,966.00
Overhead & Profit 10% Rp 38,196.60
Total Rp 140,054.20
Dibulatkan Rp 140,000.00
Rp 145,000.00 Rp 43,500.00
Rp 156,000.00 Rp 15,600.00
Rp 171,000.00 Rp 1,710.00
Rp 171,000.00 Rp 2,565.00
Jumlah Harga Tenaga Kerja (B) Rp 63,375.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 692,750.00
Overhead & Profit 10% Rp 69,275.00
Total Rp 762,025.00
Dibulatkan Rp 762,000.00
331,300 Rp 331,300.00
100,000 Rp 100,000.00
533,300 Rp 533,300.00
210,500 Rp 101,040.00
1,202,600 Rp 1,082,340.00
490,000 Rp 490,000.00
1,100,000 Rp 1,100,000.00
1,150,000 Rp 1,150,000.00
1,850,000 Rp 1,850,000.00
500,000 Rp 500,000.00
25,500 Rp 48,450.00
350,000 Rp 1,400,000.00
500,000 Rp 500,000.00
25,500 Rp 5,100.00
210,500 Rp 210,500.00
87,300 Rp 122,220.00
58,300 Rp 81,620.00
Rp 55,555.56 Rp 66,666.67
Rp 145,000.00 Rp 36,250.00
Rp 171,000.00 Rp 4,275.00
Jumlah Harga Tenaga Kerja (B) Rp 40,525.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 107,191.67
Overhead & Profit 10% Rp 10,719.17
Total Rp 117,910.83
Dibulatkan Rp 117,900.00
400,000 Rp 400,000.00
100,000 Rp 100,000.00
5 Batu kerikil m3
6 Batu Alam m2
9 pasir urug m3
10 tanah urug m3
II BAHAN PEREKAT
NO URAIAN Spesifikasi Teknis Rekomendasi Merk SATUAN
4 Kawat beton kg
NO URAIAN Spesifikasi Teknis Rekomendasi Merk SATUAN
IV BAHAN KAYU
4 Kayu klas IV m3
V BAHAN ALMUNIUM
VI BAHAN PELAPIS
1 Genteng Metal Multi roof tekstur berpasir 82 x 88 cm Sakura roof/ Multi roof/Prima lembar
roof/Prima Roof/Tiara roof
IX BAHAN KACA
1 Paku 1 s/d 3 cm kg
2 Paku 5 s/d 10 cm kg
3 Paku 8 s/d 12 cm kg
4 Paku skrup bh
NO URAIAN Spesifikasi Teknis Rekomendasi Merk SATUAN
XI BAHAN FINISHING
4 wood filler kg
7 Kuas Cat bh
11 Lem kayu kg
12 Seal tape bh
XV PERALATAN ELEKTRIKAL
5 Isolasi 3 M setara bh
Bond Breaker m2
1 Pekerja org/hari
15 Mandor org/hari
XVII LAIN-LAIN
BAHAN BANGUNAN DAN UPAH KERJA
HARGA
PUPR KAB./KOTA KETERANGAN
(Rp.)
800.00
451,000.00
278,000.00
272,500.00
272,500.00
177,000.00
140,667.00
HARGA
PUPR KAB./KOTA KETERANGAN
(Rp.)
72,700.00
16,067.00
13,500.00
13,500.00
257,500.00
26,900.00
HARGA
PUPR KAB./KOTA KETERANGAN
(Rp.)
19,430,900.00
6,980,000.00
4,188,000.00
1,591,500.00
80,700.00 Coklat
98,800.00
98,800.00
331,300.00
66,000.00 Pintu
264,000.00
325,000.00
HARGA
PUPR KAB./KOTA KETERANGAN
(Rp.)
Tidak ada di SSH 2018
20,200.00
27,000.00
64,000.00
105,000.00
HARGA
PUPR KAB./KOTA KETERANGAN
(Rp.)
91,833.00
91,833.00
91,000.00
65,000.00
65,000.00
61,500.00
HARGA
PUPR KAB./KOTA KETERANGAN
(Rp.)
87,000.00
28,900.00
29,100.00
8,100.00
HARGA
PUPR KAB./KOTA KETERANGAN
(Rp.)
132,833.00
33,500.00
23,600.00 Thinner A
5,000.00
34,743.00 4 inchi
157,668.00 2,5 kg
218,025.00 2,5 kg
60,000.00 5 kg
122,500.00
5,000.00
30,100.00
HARGA
PUPR KAB./KOTA KETERANGAN
(Rp.)
3,395,600.00
1,646,800.00
50,667.00
435,000.00
396,000.00
24,500.00 1/2"
HARGA
PUPR KAB./KOTA KETERANGAN
(Rp.)
155,000.00
32,000.00 Type AW
37,000.00 Type AW
17,758.25 Type C
22,983.25 Type C
35,000.00
3,054,800.00
11,600.00
15,600.00
10,900.00
32,450.00
HARGA
PUPR KAB./KOTA KETERANGAN
(Rp.)
51,900.00
27,300.00
38,700.00
35,667.00
1,218,100.00
1,122,433.00
60,300.00
70,000.00
116,800.00 Walles
145,000.00
156,000.00
156,000.00
171,000.00
156,000.00
156,000.00
171,000.00
156,000.00
156,000.00
171,000.00
156,000.00
HARGA
PUPR KAB./KOTA KETERANGAN
(Rp.)
171,000.00
156,000.00
171,000.00
171,000.00
DAFTAR HARGA UPAH DAN BAHAN
C BAHAN BESI
1 Besi Beton kg Rp 15,000
2 Kawat Beton kg Rp 20,000
3 Wiremesh kg
4 Besi Siku 30.30.3 kg
5 Besi Siku 40.40.4 kg
6 Besi Siku 50.50.5 kg
7 Besi Siku 70.70.7 kg
8 Besi Siku 90.90.9 kg
9 Besi Baja WF kg
10 Besi Profil kg
11 Besi Black Steel (S40) kg
12 Profil Alumnium 3"x 1,5" tebal 1,2 mm m
13 Besi Canal kg
14 Besi Plat Baja kg
15 Besi Plat Ukuran 3 mm (1,2 x 2,4 x 3) lbr
16 Kawat Berduri rol
17 Kawat Besi dia 4 mm kg Rp 20,000
18 Kawat Las kg
19 Kawat Nyamuk m2
20 Kawat Bronjong 3 mm kg
21 Kawat Bronjong 4 mm kg
22 Besi Angkur 8 mm kg
23 Besi Strip tebal 5 mm kg
24 Besi Strip 2 x 3 mm kg Rp 11,036
25 Baja Strip (0.2 x 2) cm kg
26 Baja Strip kg
27 Besi Square Tube m
28 Besi List Kaca (1 x 1) cm m
NO URAIAN SATUAN HARGA
29 Pintu Gulung Besi m2
30 Pintu Lipat baja Folding Door m2
31 Sunscreen Aluminium m2
32 Rolling Door Aluminium m2
33 Aluminium Strip m
34 Pintu Aluminium m
35 Profil Kaca Aluminium m
36 Jendela Naco (Rangka + Kaca 3 mm) m2 Rp 70,000
Rangka Hollow 40x40 2mm m' Rp 95,000
D BAHAN PAKU
1 Paku kg Rp 55,000
2 Paku Sekrup kg Rp 25,000
3 Paku Kait bh
4 Paku Seng kg
5 Paku Sumbat bh
6 Besi Angkur bh
7 Paku Asbes/Seng Belombang bh
8 Paku Skrup 1 - 2,5 Cm bh
9 Skrup Fixer bh
E BAHAN ATAP
1 Seng Gelombang BJLS 20 lbr Rp 55,000
2 Seng Gelombang BJLS 25 lbr
3 Seng Gelombang BJLS 30 lbr
4 Seng Plat BJLS 20 lbr Rp 55,000
5 Seng Plat BJLS 25 lbr
6 Seng Plat BJLS 28 lbr
7 Seng Plat BJLS 30 lbr Rp 65,000
8 Sirap Kalimantan bh
9 Asbes Gelombang 92 x 180 lbr
10 Asbes Gelombang 105 x 240 lbr
11 Atap Cahaya Deck m2
12 Bubungan Asbes Gelombang 92 cm lbr
13 Bubungan Asbes Gelombang 105 cm lbr
14 Bubungan Atap Cahaya Deck m
15 Bubungan Genteng Beton bh
16 Bubungan Genteng Keramik bh
17 Bubungan Genteng Kodok bh
18 Bubungan Genteng Lokal bh
19 Bubungan Genteng Pejaten bh
20 Bubungan Genteng Karang Pilang bh
21 Bubungan Genteng Metal bh Rp 35,000
22 Genteng Kaca 5 mm bh
23 Genteng Karang Pilang bh
24 Genteng Keramik bh
25 Genteng Pejaten bh
26 Genteng Beton bh
NO URAIAN SATUAN HARGA
27 Genteng Kodok bh
28 Genteng Lokal bh
29 Genteng Metal lbr Rp 50,000
NO URAIAN SATUAN HARGA
G BAHAN LANTAI
1 Beton Grid Pracetak m2
2 Keramik Cutting m2
3 Keramik KW I (Motif) m2
4 Keramik KW I (Polos) m2
5 Keramik KW II (Motif) m2
6 Keramik KW II (Polos) m2
7 Keramik Dinding m2
8 Marmer 100/100 m2
9 Marmer m2
10 Porselin 11/11 bh
11 Porselin 10/20 bh
12 Porselin 20/20 bh
13 Ubin Keramik 30/30 DOOS Rp 75,000
14 Ubin Keramik 33/33 bh
15 Ubin Keramik 40/40 bh
16 Ubin Keramik 20/20 DOOS Rp 75,000
Ubin Keramik 20/25 bh Rp 3,750
17 Ubin Keramik 10/33 bh
18 Mozaik 30/30 bh
19 Ubin Keramik Artistik 10/20 bh
20 Ubin Keramik Artistik 10/10 bh
21 Keramik Artistik 5/20 bh
22 Keramik Artistik 10/20 bh
23 Plint Keramik Artistik 10/10 bh
24 Plint Keramik Artistik 10/20 bh
25 Plint Keramik Artistik 5/20 bh
26 Plint Internal Cove Artistik 5 x 5/20 bh
27 Ubin Abu-abu 20/20 bh
28 Ubin Abu-abu 30/30 bh
NO URAIAN SATUAN HARGA
29 Ubin Abu-abu 40/40 bh
30 Plint Ubin Abu-abu 15/20 bh
31 Plint Ubin Abu-abu 10/30 bh
32 Plint Ubin Abu-abu 10/40 bh
33 Ubin Warna 20/20 bh
34 Ubin Warna 30/30 bh
35 Ubin Warna 40/40 bh
36 Plint Ubin Warna 10/20 bh
37 Plint Ubin Warna 10/30 bh
38 Plint Ubin Warna 10/40 bh
39 Ubin Teraso 30/30 bh
40 Ubin Teraso 40/40 bh
41 Plint Ubin Teraso 10/30 bh
42 Plint Ubin Teraso 10/40 bh
43 Ubin Granit 30/30 bh
44 Ubin Granit 40/40 bh
45 Plint Ubin Granit 10/30 bh
46 Plint Ubin Granit 10/40 bh
47 Ubin Teralux Kerang 30/30 bh
48 Ubin Teralux Kerang 40/40 bh
49 Plint Ubin Teralux Kerang 10/30 bh
50 Plint Ubin Teralux Kerang 10/40 bh
51 Ubin Teralux Marmer 30/30 bh
52 Ubin Teralux Marmer 40/40 bh
53 Ubin Teralux Marmer 60/60 bh
54 Plint Ubin Teralux Marmer 10/30 bh
55 Plint Ubin Teralux Marmer 10/40 bh
56 Plint Ubin Teralux Marmer 10/60 bh
57 Teraso Cor m3
58 Batu Teraso kg
59 Batu Granit kg
60 Karpet m2
61 Underlayer / Rubber Corrugated m2
62 Parquet m2
63 Gymfloor (Lantai Kayu) m2
64 Vinyl 30/30 bh
65 Batu Andesit 2x40 bh Rp 1,840
66 Batu Andesit 20x40 bh Rp 12,264
H BAHAN PIPA
1 Pipa GI dia 1 /2
1 "
m
2 Pipa GI dia 1" m
3 Pipa GI dia 1/2" m
4 Pipa GI dia 10" m
5 Pipa GI dia 2" m
6 Pipa GI dia 3" m
7 Pipa GI dia 3/4" m
8 Pipa GI dia 4" m
NO URAIAN SATUAN HARGA
9 Pipa GI dia 6" m
10 Pipa GI dia 8" m
11 Pipa PVC dia 1" m
12 Pipa PVC dia 1/2" Type AW m Rp 9,500
13 Pipa PVC dia 3/4" Type AW m Rp 12,000
14 Pipa PVC dia 1" Type AW m
15 Pipa PVC dia 1 /2 Type AW
1 "
m
16 Pipa PVC dia 2" Type AW m
17 Pipa PVC dia 2 /2 Type AW
1 "
m
18 Pipa PVC dia 3" Type AW m Rp 67,500
19 Pipa PVC dia 4" Type AW m Rp 106,250
20 Pipa PVC dia 6" m
21 Pipa PVC dia 8" m
22 Pipa PVC dia 2" Type D m
23 Pipa PVC dia 2 /2 Type D
1 "
m
24 Pipa PVC dia 3" Type D m
25 Pipa PVC dia 4" Type D m
26 Waterstop PVC b : 150 mm (Talang ) m
27 Waterstop PVC b : 200 mm (Talang ) m
28 Waterstop PVC b : 230 - 320 mm (Talang ) m
I BAHAN KACA
1 Kaca Polos 3 mm m2 Rp 80,000
2 Kaca Polos 5 mm m2
3 Kaca Polos 10 mm m2
4 Kaca Raiben 5 mm m2
5 Kaca Raiben 10 mm m2
6 Kaca Raiben 12 mm m2
7 Kaca Buram 3 mm m2
8 Kaca Buram 5 mm m2
9 Kaca Buram Bermotif 3 mm m2
10 Kaca Buram Bermotif 5 mm m2
11 Kaca Cermin 5 mm m2
12 Kaca Wire Glass 5 mm m2
13 Kaca Wire Glass 8 mm m2
14 Kaca Nako Daun
15 Kaca Es 3 mm m2
J BAHAN CAT
1 Amplas Lembar Rp 10,000
2 Cat Kayu Mutu Tinggi kg
3 Cat Kayu Mutu Menengah kg Rp 50,000
4 Cat Tembok Mutu Tinggi kg Rp 18,000
5 Cat Tembok Mutu Menengah kg
6 Cat Dasar Kayu kg Rp 8,800
7 Cat Besi kg
8 Cat Genteng kg
9 Kuas kg Rp 20,000
10 Meni Kayu kg Rp 37,000
NO URAIAN SATUAN HARGA
11 Meni Besi kg
12 Minyak Cat liter
13 Minyak Tanah (Karosene) liter
14 Plamir Kayu kg Rp 19,320
15 Plamir Tembok kg Rp 19,320
16 Tepung Gypsum kg
17 Politur liter Rp 65,000
18 Residu (Teer) liter
19 Roll Cat bh
20 Kape bh
21 Sikat Baja bh
22 Seperitus liter
23 Teak Oil liter
24 Vernis liter
25 Wood Filler kg
26 Soda Api kg
K BAHAN KUNCI
1 Engsel Biasa bh Rp 30,000
2 Engsel Nilon bh
3 Expagnolete bh
4 Grendel Besar bh
5 Grendel Kecil bh
6 Kait Angin Kecil bh
7 Kait Angin Besar bh Rp 10,000
8 Kunci Tanam Biasa bh Rp 150,000
9 Kunci Tanam Biasa Mutu Menengah bh Rp 150,000
10 Kunci Tanam Antik bh Rp 175,000
11 Kunci Silinder bh Rp 150,000
12 Kunci Slot bh Rp 40,250
13 Door Holder bh
14 Door Closer bh
15 Door Stop bh
16 Rel Pintu bh
L BAHAN SANITAIR
1 Bak Cuci Stainless Steel 1 Lobang bh Rp 450,000
2 Bak Cuci Stainless Steel 2 Lobang bh Rp 550,000
3 Bak Cuci Piring Teraso bh
4 Bak Fiberglass 0,3 M3 bh Rp 345,000
5 Bak Fiberglass 1,00 M3 bh
6 Bak Mandi Plastik 0,5 M3 bh
7 Bak Mandi Porselin bh
8 Bak Mandi Teraso 50 x 50 x 50 bh
9 Kloset Duduk keramik bh
10 Kloset Jongkok Porselin bh Rp 170,000
11 Kloset Jongkok Teraso bh Rp 150,000
12 Reservoir Air Rangka Baja 1 M3 bh
13 Saringan Air Besi bh
NO URAIAN SATUAN HARGA
14 Saringan Air Besi Stainless bh
15 Saringan Air Plastik bh
16 Septictank 1 M3 bh
17 Septictank 2 M3 bh
18 Sumur Pompa Tangan Terpasang bh
19 Urinoir Porselin bh
20 Wastafel bh
21 Kran Air dia 1/2" bh Rp 10,000
22 Kran Air dia 3/4" bh Rp 12,000
23 Floor Drain bh Rp 30,000
24 Seal Tape bh Rp 5,000
25 Gorong-Gorong d 80 cm Bh
M BAHAN LISTRIK
1 Box Sekering Satu Group bh
2 Box Sekering Dua Group bh
3 Box Sekering Empat Group bh Rp 10,000
4 Listrik kwh
5 Saklar Ganda bh Rp 10,000
6 Saklar Tunggal bh Rp 8,000
7 Stop Kontak Luar bh Rp 10,000
8 Stop Kontak Tanam bh Rp 15,000
9 Titik lampu bh Rp 9,000
N BAHAN TAMBAHAN
1 Axytilin botol
2 Bahan Bakar Bensin liter
3 Bahan bakar Solar liter
4 Bentonite zak
5 Flux Oil liter
6 Kayu Bakar m3
7 Minyak Pelumas liter
8 Oli Merk Mesran liter
9 Oli Merk Penzoil liter
10 Oli Merk Top One liter
11 Oli SAE 100 liter
12 Oli SAE 30 liter
13 Oli SAE 40 liter
14 Oli SAE 90 liter
15 Oxigen botol
16 Wall Paper m2
17 Floorhardener kg
18 Ramset bh
19 Sealent tube Rp 29,295
20 Venetions blinds dan Vertical blinds (Tirai) m2
21 Air liter Rp 120
22 Minyak Bekisting liter Rp 12,198
23 Form tee/Penjaga jarak bekisting/Spacer bh
NO URAIAN SATUAN HARGA
24 Lem Kayu kg Rp 15,000
25 Lem Vinyl kg
26 Lem kg
27 Ijuk kg Rp 20,000
Pintu PVC bh Rp 250,000
C-75,0.8 m' 11000
C-75, 0.6 m' 8000
Baut Bh 2140
Dynabolt Bh 2247
Reng m' 4500
NO URAIAN SATUAN HARGA
UPAH
1 Pekerja OH Rp 70,000
2 Tukang Kayu OH Rp 85,000
3 Tukang Batu OH Rp 85,000
4 Tukang Besi OH Rp 85,000
5 Tukang Cat OH Rp 85,000
6 Tukang Listrik OH Rp 85,000
7 Tukang Gali OH Rp 85,000
8 Tukang Las OH Rp 85,000
9 Kepala Tukang OH Rp 95,000
10 Mandor OH Rp 75,000
11 Operator Alat OH