DAFTAR HARGA SATUAN DASAR MATERIAL dan UPAH

KEGIATAN :
PEKERJAAN : PENYUSUNAN DED GELANGGANG OLAH RAGA (GOR) KABUPATEN PULAU MOROTAI
LOKASI : KABUPATEN PULAU MOROTAI
TA : 2017

NO. URAIAN Spesifikasi KODE SATUAN HARGA SATUAN (RP)

BAHAN AGREGAT, BAHAN PEREKAT, dan BAHAN JADINYA


1 Pasir Urug M01 m3 450,000.00
2 Pasir Pasang M02 m3 450,000.00
3 Pasir Beton M03 m3 450,000.00
4 Batu Bulat (Utuh) M04 m3 400,000.00
5 Batu Karang M05 m3 400,000.00
6 Batu Bulat 15 Cm M06 m3 400,000.00
7 Batu Pecah 7/10 cm M07 m3 500,000.00
8 Kerikil Beton/Batu Pecah 5/7 cm M08 m3 500,000.00
9 Kerikil Beton/Batu Pecah 2/3 2/3 cm M09 m3 429,700
10 Kerikil Beton/Batu Pecah 1/2 1/2 cm M10 m3 429,700
11 Kerikil Halus 0,5/1 Cm M11 m3 388,300
12 Kerikil Kasar 3/5 Cm M12 m3 494,300
13 Batu Kali/Gunung 10/15 - 15/20 Cm M13 m3 494,300
14 Batu Split/Abu Batu 0,1 - 1 Cm M14 m3 720,000
15 Batu Apung 1 - 2 Cm M15 m3 270,000
16 Tanah Urug M16 m3 450,000
17 Sirtu M17 m3 450,000
18 Pasir Halus timbunan M18 kg 450,000
19 Pasir Alas Pasir Alas M19 298,000
BATU BATA PRESS
1 Batu bata Klas. 1 M20 BH 3,300
2 Batu bata Klas. 2 M21 BH 9,200
3 Batu bata Merah M22 BH 9,200
4 Paving Blok Segi Empat 20 x 20 / M2 M23 BH 3,900
Segi Empat 10 x 20 / M2 M24 BH 3,900
Segi Tiga M25 BH 3,900
Segi Enam M26 BH 3,900
SEMEN
1 SEMEN PC Tonasa M27 Zak 86,000
Bosowa M28 Zak 110,000
Gresik M29 Zak 73,000
3 Semen warna M30 Kg 15,000
4 Semen Putih M31 Zak (50 Kg) 125,000
SENG
1 Seng Gelombang BJLS 0,20 M32 Lembar 76,500
2 Seng Gelombang BJLS 0,25 M33 Lembar 88,900
3 Seng Gelombang BJLS 0,30 M34 Lembar 101,400
4 Seng Plat BJLS 20 M35 m 53,900
5 Seng Plat BJLS 25 M36 m 78,000
6 Seng Plat BJLS 30 M37 m 63,500
7 Atap Nipa/Rumbia M38 LBR 28,600
KAYU
1 Kayu balok Kls. I M39 m3 4,500,000
2 Papan Kayu Kls. I M40 m3 4,500,000
3 Kayu balok Kls. II M41 m3 2,500,000
4 Papan Kayu Kls. II 3/25 x 3 m M42 m3 2,500,000
5 Kayu Dolken (Untuk Pondasi) M43 m3 1,650,000
BAMBU
1 Besar Mdl. 15 Cm M44 BTG 23,000
2 Sedang Mdl. 10 Cm M45 BTG 17,500
3 Kecil Mdl. 0,5 Cm M46 BTG 12,000
BETON BUIS
Mdl. 10 Cm x 1 M' M47 BH
Mdl. 15 Cm x 1 M' M48 BH
BAHAN LANTAI
Keramik Kualitas sedang 10 x 20 Cm M49 DOS 68,109
20 x 20 Cm M50 DOS 45,000
20 x 25 Cm M51 DOS 74,000
30 x 30 Cm M52 DOS 48,000
40 x 40 Cm M53 DOS 52,000
Keramik Kualitas Sedang 10 x 20 Cm M54 DOS 108,000
20 x 20 Cm M55 DOS 105,000
20 x 25 Cm M56 DOS 115,200
30 x 30 Cm M57 DOS 102,000
40 x 40 Cm M58 DOS 125,000
BESI BETON HARGA /STAF HARGA/M' HARGA / M'
4 23,774 M59 1,981 27,000
5 31,055 M60 2,588 35,000
6 45,000 M61 3,750 48,000

Daftar Harga Satuan Dasar Material dan Upah 1


KEGIATAN :
PEKERJAAN : PENYUSUNAN DED GELANGGANG OLAH RAGA (GOR) KABUPATEN PULAU MOROTAI
LOKASI : KABUPATEN PULAU MOROTAI
TA : 2017

NO. URAIAN Spesifikasi KODE SATUAN HARGA SATUAN (RP)


8 93,000 M62 7,750 101,000
10 105,000 M63 8,750 120,000
12 166,175 M64 13,848 181,000
14 180,251 M65 15,021 192,000
16 265,763 M66 22,147 265,000
19 387,500 M67 32,292 375,000
22 491,744 M68 40,979 487,000
25 642,000 M69 53,500 725,000
Besi Plat 2 mm = 120 x 240 mm M70 M1 318,300
3 mm = 120 x 240 mm M71 M1 312,700
KAWAT
Ikat Beton (bendrat) M72 Kg 40,000
Namuk Plastik (kasa) M73 m2 14,000
Nyamuk Kawat M74 m2 21,000
Saringan Pasir (ayakan) M75 m2 16,000
Kawat Duri M76 Rool 450,000
M77 Kg 117,000
Kawat Bronjong 4 mm M78 Rool 850,000
M79 Kg 46,500
BAHAN LANGIT-LANGIT
TAEKWOOD 3 mm uk. 122 x 244 cm M81 Lembar 205,500
3 mm uk. 80 x 244 cm M82 Lembar 202,500
TRIPLEKS 2 mm uk. 122 x 244 cm M83 Lembar 65,000
3 mm uk. 122 x 244 cm M84 Lembar 75,000
6 mm uk. 122 x 244 cm M85 Lembar 120,000
9 mm uk. 122 x 244 cm M86 Lembar 380,000
20 mm uk. 122 x 244 cm M87 Lembar 525,500
Tripleks KM/WC Lapis Almunium 3 mm M88 Lembar 171,250
BAHAN PIPA
PIPA GALVANIS MEDIUM B Dia 1/2" Medium B M89 Staf 175,000
Dia 3/4" Medium B M90 Staf 210,000
Dia 1" Medium B M91 Staf 310,000
Dia 1 1/4" Medium B M92 Staf 460,378
Dia 1 1/2" Medium B M93 Staf 480,000
Dia 2" Medium B M94 Staf 652,000
Dia 2 1/2" Medium B M95 Staf 850,000
Dia 3" Medium B M96 Staf 1,990,000
PIPA GALVANIS MEDIUM A Dia 1/2" Medium A M97 Staf 210,000
Dia 3/4" Medium A M98 Staf 252,000
Dia 1" Medium A M99 Staf 450,000
Dia 1 1/4" Medium A M100 Staf 619,377
Dia 1 1/2" Medium A M101 Staf 680,000
Dia 2" Medium A M102 Staf 892,000
Dia 2 1/2" Medium A M103 Staf 1,150,000
Dia 3" Medium A M104 Staf 1,562,200
PIPA PVC 1/2" M105 Staf 32,000
3/4" M106 Staf 38,000
1" M107 Staf 45,000
11/4" M108 Staf 38,500
11/2" M109 Staf 38,500
2" M110 Staf 74,000
2 1/2" M111 Staf 63,400
3" M112 Staf 69,600
4" M113 Staf 82,000
BAHAN LANGIT-LANGIT
PIPA GIP 1/2" M114 Staf 38,000
3/4" M115 Staf 178,686
1" M116 Staf 60,000
2" M117 Staf 120,000
2 1/2" M118 Staf 167,483
3" M119 Staf 194,590
4" M120 Staf 251,554
1 1/2 M121 Staf 78,567
PIPA PERSEGI
Pipa Listrik PVC
Klute PVC Ukr. Mdl. 1/2' M122 BTG 2,000
Klute PVC Ukr. Mdl. 3/4' M123 BTG 2,500
Klute PVC Ukr. Mdl. 1' M124 BTG 4,312
Klute PVC Ukr. Mdl. 1 1/4' M125 BTG 10,719
Klute PVC Ukr. Mdl. 1 1/2' M126 BTG 11,787
Klute PVC Ukr. Mdl. 3' M127 BTG 14,991
Klute PVC Ukr. Mdl. 4' M128 BTG 17,126
Sook GIP Ukr. Mdl. 1 1/2' M129 BTG 1,600
Sook GIP Ukr. Mdl. 1' M130 BTG 1,200
Sook GIP Ukr. Mdl. 1/2' M131 BTG 1,000
BAHAN KACA

Daftar Harga Satuan Dasar Material dan Upah 2


KEGIATAN :
PEKERJAAN : PENYUSUNAN DED GELANGGANG OLAH RAGA (GOR) KABUPATEN PULAU MOROTAI
LOKASI : KABUPATEN PULAU MOROTAI
TA : 2017

NO. URAIAN Spesifikasi KODE SATUAN HARGA SATUAN (RP)

Kaca raybend 3 mm uk. 152 x 122 M132 m2 480,000


5 mm uk. 152 x 122 M133 m2 650,000
Kaca Bening 3 mm uk. 152 x 122 M134 m2 240,000
5 mm uk. 152 x 122 M135 m2 272,000
Es / Kembang Ukr. Tbl. 3 mm M136 m2 448,671
BAHAN LISTRIK
Kabel NM 2 x 1 1/2 mm M136 m2 450,000
Kabel NM 3 x 1 1/2 mm M137 m2 525,000
Sekring 1 Phase M136 m2 22,000
Sekring 2 Phase M137 m2 25,000
Saklar Tunggal (Baik/Broco) M136 m2 42,500
Saklar Ganda M137 m2 21,000
Kontak Tanam M136 m2 20,000
BAHAN LANGIT LANGIT
Lampu TL 10 Wat M137 BH 32,000
20 Wat M138 BH 62,300
40 Wat M139 BH 82,000
100 Wat M140 BH 139,927
Lampu Jari Jari 7 Wat Philips M141 BH 28,000
9 Wat Philips M142 BH 45,000
14 Wat Philips M143 BH 47,000
18 Wat Philips M144 BH 61,000
25 Wat Philips M145 BH 64,000
Lampu Pijar 5 Wat M147 BH 23,000
10 Wat M148 BH 87,000
25 Wat M149 BH 41,000
40 Wat M150 BH 21,900
60 Wat M151 BH 96,000
75 Wat M152 BH 79,781
100 Wat M153 BH 160,000
Lampu Neon (Komplit) TL 10 W M147 BH 48,000
Lampu Neon (Komplit) TL 20 W M148 BH 83,000
Lampu TL Lokal Putih M149 BH 90,511
Lampu TL Lokal Warna M150 BH 76,736
TL Bulat 20 W (Komplit) M151 BH 72,000
TL Bulat 40 W (Komplit) M152 BH 98,000
Down Ligt M153 BH 213,325
Penangkal Petir 1 / Tombak M154 BH 2,742,750
Box Sekring 2 Group M155 BH 182,850
PENGGANTUNG
Kait Angin M156 BH 29,000
Grendel M157 BH 20,000
Kunci Gembok M158 BH 28,000
Kunci kualitas baik M159 BH 295,000
BAHAN SANITAIR
Kloset Jongkok Lokal M160 BH 460,000
Kloset Duduk M161 BH 2,271,000
Washtavel M162 BH 750,000
Tempat Cuci 1 Lubang M163 BH 430,000
Tempat Cuci 2 Lubang M164 BH 520,000
Orincer Lokal Putih M165 BH 1,909,460
Orincer Lokal Warna M166 BH 1,909,460
Beth Tube M167 BH 3,250,000
Floor Drain M168 BH 28,500
Pompa Air M169 BH 650,000
Pompa AirTangan M170 BH 420,000
BAHAN BAKU
Paku Campur BH 45,000
Paku Seng BH 45,000
Paku Asbes BH 42,000
BAHAN FINISHING
Amplas Kayu / Besi BH
Dumpul Kayu BH 40,000
Spirtus BH 60,000
Minyak Cat BH 35,000
Politur BH 45,000
Teao oil BH 62,798
Oaker BH 38,539
Menie Kayu BH 50,000
Menie Besi BH 50,000
Cat Besi BH 65,000
Cat Tembok BH 55,000
Cat Kayu Mengkilat BH 75,000

Nipon 1/2' BH 17,100

Daftar Harga Satuan Dasar Material dan Upah 3


KEGIATAN :
PEKERJAAN : PENYUSUNAN DED GELANGGANG OLAH RAGA (GOR) KABUPATEN PULAU MOROTAI
LOKASI : KABUPATEN PULAU MOROTAI
TA : 2017

NO. URAIAN Spesifikasi KODE SATUAN HARGA SATUAN (RP)


Nipon 3/4' BH 23,300
Biasa 1/2' BH
KUAS
Besar BH 140,000
Sedang BH 97,000
Kecil BH 60,000
C BAHAN LOGAM dan BAHAN JADINYA M124
Ref. Produk, Baja Tulangan: SJ, KS, dan KSS M125
1 Baja Tulangan Polos, BJTP, U24 M126 kg
2 Baja Tulangan Ulir, BJTD, U42 M127 kg
3 Wiremesh M10, 2,1 x 5,4 meter (96,55 kg/lbr), U50 M128 kg
4 Kawat beton M129 kg
5 Kawat Ayam M130 m2
6 Baja Profil, IWF/INP/DIR/DIN/CHANEL M131 kg
7 Paku ukuran 1cm-3cm M132 kg
8 Paku ukuran 4cm-7cm M133 kg
9 Paku ukuran 8cm-12cm M134 kg
10 Paku Sekrup 3" M135 bh
11 Paku Pisher 3" M38 bh
12 Ram Shet 12 cm s/d 20 cm M39 bh
13 Paku Ripet M40 bh
14 Besi Hollow Pintu Baja 40x40 mm, t = 0,8 mm M41 m1
15 Besi Hollow Galvanis 40x40mm, t = 0,4 mm M42 m1
16 Pipa stainless steel M43 m'
17 Acrilic, t = 5 mm M44 m2
18 Angkur Baut Ø19 M45 bh
19 Angkur Baut Ø22 M46 bh
20 Baut+Mur+Ring M46 bh
21 Sekrup Gypsum/GRC M46 kg

D BAHAN PINTU dan JENDELA


Ref. Produk, Kusen: Alcan, Alexindo, Indal, Superex
Ref. Produk, Accessories: Deckson, Solid, dan SES
Ref. Produk, Kaca: Panasap , Asahimas, Mulia
1 Kusen Alumunium 4", Coating Putih M44 m1
2 Daun Jendela Alumunium, Coating Putih M45 m1
3 Daun Pintu Alumunium, Coating Putih M46 m1
4 Engineering Door Panel Kayu Oven, Honey Comb Double HPL, Wood M47 unit
Edging
5 Jalusi Alumunium M48 m2
6 Engsel Pintu,Stainless Steel 4"x3"x2", M49 psg
7 Engsel Casement Iron Friction Stay 8" sekualitas M50 psg
Solid 701 US320
8 Casement Handle sekualitas Solid RMB 704SN M51 psg
9 Handle Pintu M52 psg
10 Cylinder, sekualitas Solid, DC 02-50SCR M53 bh
11 Sealant M54 m1
12 Flushbolt 6"+12", sekualitas Solid, 644 US32D M55 psg
13 Mortise Lock, sekualitas Solid, LC 101 WL 50SN M56 bh
14 Rel sekualitas Solid M57 m1
15 Breket sekualitas Solid M58 bh
16 Roda sekualitas Solid M59 bh
17 Door Stop sekualitas Solid M60 bh
18 Kaca polos 5 mm M61 m2
19 Kaca Polos 8 mm M62 m2
20 Kaca Polos 10 mm M63 m2
21 Kaca Es 5 mm M64 m2
22 Kaca Tempered, t = 12 mm+Sandblast M65 m2
23 Kaca Curtain Wall, Stopsol Silver Green, t = 8 mm M66 m2

Daftar Harga Satuan Dasar Material dan Upah 4


KEGIATAN :
PEKERJAAN : PENYUSUNAN DED GELANGGANG OLAH RAGA (GOR) KABUPATEN PULAU MOROTAI
LOKASI : KABUPATEN PULAU MOROTAI
TA : 2017

NO. URAIAN Spesifikasi KODE SATUAN HARGA SATUAN (RP)


E BAHAN ATAP
Ref. Produk, Rangka Atap: GEASINDO, APORA, dan TRIDOME
Ref. Produk, Penutup Atap: GEASINDO, UTAMA DECK, dan KANA KZ
1 Pek. Atap Space Frame M67 m2
• Member 2"-8", t = 2,3 -12,7
• Baut HT Grade 8.8-6400 kg/cm2
• Ball Joint T.84-T.190
• Finishing Duco
• Dudukan Gording
• Gording Primer 3"-3.2
• Gording Skunder 2.5"-2.8
• Finishing Cat Duco
• Plat Dudukan Hunter
• Hunter+Sekrup
• Penutup Atap Zincalume Zip Dack, t = 0,5 mm Warna

2 Lapisan Polymaster Polyurethane Foam M68 m2

F BAHAN PLAFOND
Ref. Produk, Gypsumboard: Knauf, Jayaboard, dan Elephant
Ref. Produk, GRC: GRC Board, Kalsiboard, Jayaboard, Elephant
1 GRC 1200x2400, t= 6 mm M69 lbr
2 Gypsumboard 120 x 240 t = 9 mm M70 lbr
3 Semen Compound M63 kg
4 Joint Tape @75 m M64 roll

G BAHAN PELAPIS LANTAI dan DINDING


Ref. Produk, Pelapis Lantai dan Dinding: Essenza, Niro, dan Granito
1 HomogeniusTile 60X60 Polish M71 m2
2 HomogeniusTile 60X60 Unpolish M72 m2
3 HomogeniusTile 80X80 Polish M73 m2
4 HomogeniusTile 30X60 Polish M74 m2
5 HomogeniusTile 30X60 Unpolish M75 m2
6 Parquet Kayu M76 m2

H BAHAN FINISHING/PENGECATAN/LABURAN
Ref. Produk, Cat Dinding Interior: Sigma, Propan, Dulux ICI, Nippon paint dan Jotun
Ref. Cat Dinding Exterior: Sigma, Propan, Akjonobel (heavy duty) dan Jotun,Dulux (weather shield)
Ref. Produk, Cat Plafond: Premio, Sigma, Vinilex, Nippon paint dan Sanlex
Ref. Produk, Cat Kayu/Besi: Seiv, ICI, Nippon paint
Ref. Produk, Water Proofing: Master Guard, SIKA, Intra, dan FOSROC
Ref. Produk, Alumunium Composite Panel: Alucomp, Alcobond
1 Cat Dasar M77 kg
2 Cat Dinding Interior M78 kg
3 Cat Dinding Exterior M79 kg
4 Cat kayu/besi M80 kg
5 Water Proofing M81 m2
6 Vernis M82 ltr
7 Dempul M83 kg
8 Plamir M84 kg
9 Terpentin M85 ltr
10 Kwas M86 bh
11 Roll Cat M87 bh
12 Ampelas M88 lbr
13 Minyak bekisting M89 ltr
14 Alumunium Composite Panel 1,22x2,44 Tebal 4mm M90 lbr
15 Water Stop PVC Lebar 230-320 mm M91 m1
16 Cat Menie M92 kg

I BAHAN PANCANG/ALAT PANCANG


Ref. Produk, Tiang Pancang: Elemenindo, Wijaya Karya Beton
1 Tiang Pancang Square □30 M93 m1
2 Bobokan Kepala Tiang Pancang M94 tk

J BIAYA SEWA ALAT BERAT


1 Crane Kecil E01 hari-sewa
2 Alat Pancang Jacking Pile/Hidrolik E02 hari-sewa
3 Alat Penyambung Tiang Pancang E03 bh
4 Excavator E04 jam
5 Dump Truck E05 jam
6 Motor Grader E06 jam
7 Tandem Roller E07 jam
8 Whell Loader E08 jam
9 Water Tanker E09 jam
10 Vibro E10 jam

Daftar Harga Satuan Dasar Material dan Upah 5


KEGIATAN :
PEKERJAAN : PENYUSUNAN DED GELANGGANG OLAH RAGA (GOR) KABUPATEN PULAU MOROTAI
LOKASI : KABUPATEN PULAU MOROTAI
TA : 2017

NO. URAIAN Spesifikasi KODE SATUAN HARGA SATUAN (RP)


11 Buldozer E11 jam

K BAHAN MATERIAL SANITARY UNIT


Ref Produk : TOTO, American Standar, HCG
1 Kloset duduk EcoWasher system CW 421 M95 Unit
~ Wash down toilet
~ Low tank w/o cover
~ Tank cover
~ Dual flush tank trim
~ Plastic seat & cover
~ Stop valve w/ flexible hose
~ Floor flange w/ seal gasket
~ Screw & caps
~ Eco Washer System Spray
2 Jet Shower Spray THX 20 White
3 Lavatory
~ Lavatory faucet
~ Waste fittings
~ Stop valve
~ Soap holder
~ Supporting fittings

Daftar Harga Satuan Dasar Material dan Upah 6


KEGIATAN :
PEKERJAAN : PENYUSUNAN DED GELANGGANG OLAH RAGA (GOR) KABUPATEN PULAU MOROTAI
LOKASI : KABUPATEN PULAU MOROTAI
TA : 2017

NO. URAIAN Spesifikasi KODE SATUAN HARGA SATUAN (RP)


4 Wall Lavatory
~ Lavatory faucet
~ Waste fittings
~ Stop valve
~ Soap holder
~ Supporting fittings
5 Urinal Type Muslim U57M
~ Wall hung urinal
~ Urinal flush valve
~ Inlet spud
~ Wall flange w/ seal gasket
~ Hanger w screw
~ Acrylic Protection Cover Urinoir
6 Urinal Partition w/ fitting AW115J
7 Shower Sheet
8 Kran Dinding T23B13
9 Floor Drain TX 1BN
10 Paper Holder S20
11 Soap Holder S156N
12 Roof Drain 4 "
13 Kitchen Sink 1 lubang Kran bawah Stainless Steel Lokal
14 Kran Lubang Vertikal Kitchen Sink
15 Kloset Jongkok with flashing Type CE 6
16 Kaca Cermin, t = 5 mm+Accessories (Terpasang)

1 Pekerja L01 Orang / Hari 60,000.00


2 Tukang L02 Orang / Hari 100,000.0
3 Kepala Tukang L03 Orang / Hari 850,000.00
4 Mandor L04 Orang / Hari 90,000.00

fw

Daftar Harga Satuan Dasar Material dan Upah 7


HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN BIDANG KONSTRUKSI
BANGKA BELITUNG
TAHUN ANGGARAN 2008
( Harga Tidak Termasuk PPN)

No. URAIAN / NAMA / JENIS BARANG SATUAN HARGA SATUAN (Rp) TYPE/MERK/SPESIFIKASI

1 2 3 4 5

A. UPAH

1 Mandor oh Rp 80,000.00
2 Mekanik oh Rp 50,000.00
3 Mekanik pembantu oh Rp 35,000.00
4 Kepala tukang oh Rp 75,000.00
5 Tukang batu oh Rp 50,000.00
6 Tukang kayu oh Rp 50,000.00
7 Tukang besi / tukang las oh Rp 50,000.00
8 Tukang cat oh Rp 50,000.00
9 Tukang listrik oh Rp 50,000.00
10 Tukang ledeng / pipa oh Rp 50,000.00
11 Tukang gali sumur oh Rp 45,000.00
12 Operator terlatih oh Rp 80,000.00
13 Operator kurang terlatih oh Rp 65,000.00
14 Pembantu operator oh Rp 30,000.00
15 Supir material / truck oh Rp 80,000.00
16 Supir personil / mobil ringan oh Rp 65,000.00
17 Pembantu supir / kenek oh Rp 30,000.00
18 Pekerja terlatih oh Rp 50,000.00
19 Pekerja agak terlatih oh Rp 42,500.00
20 Pekerja tak terlatih oh Rp 35,000.00

B. MATERIAL/BAHAN

1 Alat-alat bantu set Rp 105,600.00


2 All socket reducer PVC ø 100 x 80 (mm) unit Rp 75,000.00
3 All socket reducer PVC ø 80 x 50 (mm) unit Rp 50,000.00
Ins 4 Aluminium foil m² Rp 310,686.00 Insfoil 905 S/S , 1.25 x 60
5 Amplas lembar Rp 6,600.00 Niken
6 Aspal bitumen kg Rp 8,500.00
7 Atap alumunium super sheet uk. 1,8 x 6 (m), t = 0,2 mm (berwarna) m² Rp 55,000.00
8 Atap asbes gelombang uk. 1,50 x 0,90 (m) tebal 4 mm lembar Rp 42,000.00

Djabes, Ukuran : 1,50 m x 1,05 m x 4 mm,


9 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm lembar Rp 38,796.00
Gelombang Kecil

10 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 6 mm lembar Rp 50,500.00
11 Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm lembar Rp 41,000.00
Djabes, Ukuran : 1,80 m x 1,05 m x 4 mm,
12 Atap asbes gelombang uk. 1,80 x 1,05 (m) tebal 4 mm lembar Rp 44,626.00
Gelombang Kecil
13 Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm lembar Rp 55,500.00
14 Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm lembar Rp 43,000.00

Djabes, Ukuran : 2,10 m x 1,05 m x 4 mm,


15 Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm lembar Rp 44,626.00
Gelombang Kecil

16 Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm lembar Rp 58,700.00
17 Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm lembar Rp 45,000.00

Djabes, Ukuran : 2,40 m x 1,05 m x 4 mm,


18 Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm lembar Rp 54,696.00
Gelombang Kecil

19 Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm lembar Rp 62,700.00
20 Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm lembar Rp 46,700.00

Djabes, Ukuran : 2,70 m x 1,05 m x 4 mm,


21 Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm lembar Rp 66,144.00
Gelombang Kecil

22 Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm lembar Rp 67,000.00

Djabes, Ukuran : 3,00 m x 1,05 m x 4 mm,


23 Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm lembar Rp 71,868.00
Gelombang Kecil

24 Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm lembar Rp 72,000.00
25 Atap genteng (standar KIA) lembar Rp 8,000.00
26 Atap genteng beton ( jenis press) buah Rp 5,000.00
27 Atap genteng kodok buah Rp 3,500.00
28 Atap genteng soka buah Rp 2,300.00
29 Atap metal (biasa / polos) lembar Rp 29,000.00
30 Atap metal batuan /tekstur lembar Rp 32,000.00
31 Atap seng fibreglass lembar Rp 39,500.00
32 Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) lembar Rp 40,000.00
33 Bak cuci piring (sink) stainless steel 1 lobang buah Rp 175,000.00
34 Bak cuci piring (sink) stainless steel 2 lobang buah Rp 350,000.00
35 Bak mandi fibreglass volume 0,15 m³ buah Rp 180,000.00
36 Bak mandi fibreglass volume 0,30 m³ buah Rp 200,000.00
No. URAIAN / NAMA / JENIS BARANG SATUAN HARGA SATUAN (Rp) TYPE/MERK/SPESIFIKASI

1 2 3 4 5
37 Bak mandi fibreglass volume 1,00 m³ buah Rp 280,000.00
38 Bak mandi jenis bathtub buah Rp 1,750,000.00
39 Bataco buah Rp 2,500.00 Uk. 10 x 18 x 39
40 Batacote m² Rp 35,000.00
Batu Candi RTM, Ukuran : 10 cm x 20 cm m² Rp 97,300.00
Batu Candi RTM, Ukuran : 15 cm x 30 cm m² Rp 103,000.00
Batu Putih Jogja RTM, Ukuran : 10 cm x 20 cm m² Rp 76,700.00
Batu Putih Jogja RTM, Ukuran : 20 cm x 20 cm m² Rp 77,800.00
Batu Merah Tasik RTM, Ukuran : 10 cm x 20 cm m² Rp 72,100.00
41 Batu bata berongga uk. 5 x 11 x 24 (cm) buah Rp 800.00
42 Batu bata merah (lokal) bh Rp 600.00 Uk. 6 x 10 x 20
43 Batu belah 10 - 15 (cm) m³ Rp 158,000.00
44 Batu belah 15 - 20 (cm) m³ Rp 158,000.00
45 Batu gunung (quarry) m³ Rp 145,000.00
46 Batu kali bulat m³ Rp 121,300.00
47 Batu kapur m³ Rp 51,500.00
48 Batu kerikil ayak / batu saring / kerai m³ Rp 103,500.00
49 Batu kerikil dari galian bukit m³ Rp 95,000.00
50 Batu kerikil sungai (dengan pasir) m³ Rp 103,000.00
51 Batu pecah 0,5 - 1 (cm) m³ Rp 410,000.00
52 Batu pecah 1 - 2 (cm) m³ Rp 169,400.00
53 Batu pecah 2 - 3 (cm) m³ Rp 169,400.00
54 Batu pecah 3 - 5 (cm) m³ Rp 139,700.00
55 Batu pecah 5 - 7 (cm) m³ Rp 127,100.00
56 Batu pecah 7 - 10 (cm) m³ Rp 163,000.00
57 Batu teraso m³ Rp 105,000.00
58 Baut / mur baja buah Rp 6,000.00
59 Baut klem buah Rp 4,500.00
60 Bensin premium liter Rp 5,000.00
61 Besi baja profil IWF kg Rp 11,500.00
62 Besi baut kuda-kuda kg Rp 26,000.00
63 Besi beton kg Rp 9,430.00 Polos
64 Besi jaring kawat baja kg Rp 11,000.00
65 Besi prestressed polos kg Rp 13,000.00
66 Besi strip kg Rp 26,500.00
67 Besi teralis ø 6 mm - 10 mm m' Rp 16,500.00
68 Bilik bambu kering, uk. 1,5 x 4 (m) buah Rp 35,000.00
69 Bliksem spit penangkal petir buah Rp 57,500.00
70 Bondbeam uk. 40 x 20 x 20 (cm) buah Rp 36,500.00
71 Box sekering, 1 goup / phase buah Rp 45,000.00
72 Box sekering, 2 goup / phase buah Rp 52,500.00
73 Box sekering, 3 goup / phase buah Rp 60,000.00
74 Bubungan atap (nok) alumunium standar 40 cm, swg. 22 m² Rp 48,500.00
75 Bubungan atap (nok) asbes sepasang lembar Rp 35,000.00
76 Bubungan atap (nok) genteng (standar KIA) buah Rp 8,586.00 Keramik
77 Bubungan atap (nok) genteng beton buah Rp 3,750.00
78 Bubungan atap (nok) genteng kodok buah Rp 3,250.00
79 Bubungan atap (nok) genteng soka buah Rp 3,250.00
80 Bubungan atap (nok) metal (biasa / polos) buah Rp 32,500.00
81 Bubungan atap (nok) metal (standar Rainbow) m' Rp 130,910.00 Rainbow Roof
82 Buis beton bertulang ø 45 cm - 75 cm buah Rp 280,000.00
83 Buis beton bertulang ø 75 cm - 120 cm buah Rp 565,000.00
84 Buis beton tak bertulang ø 100 cm buah Rp 155,430.00
85 Buis beton tak bertulang ø 60 cm buah Rp 111,980.00
86 Buis beton tak bertulang ø 80 cm buah Rp 149,710.00
Cat aluminium kaleng/kg Rp 41,800.00 Glo-Tex
Cat batu alam kaleng (@ 2.5 liter) Rp 111,360.00 Propan, Stone Care, Tahan Jamur & Lumut
Cat batu alam kaleng (@ 4 kg) Rp 263,400.00 Arturo, Top Coat Glos
Cat batu alam kaleng (@ 20 liter) Rp 1,049,400.00 ICI-Dulux
Cat besi kaleng/kg Rp 112,680.00 Balastic
87 Cat dasar kg Rp 15,456.00 Paton , Zinc Crhomate
88 Cat genteng kg Rp 27,840.00 Nippon Paint, Matex (Water Base)
89 Cat jalan kg Rp 36,168.00 Glo-tex
90 Cat jembatan kg Rp 36,500.00
91 Cat menie kg Rp 17,568.00 Glo-Tex
92 Cat minyak kg Rp 21,000.00 ICI Dulux, Kansai Paint, Ftalit
93 Cat tembok kg Rp 16,776.00 ICI-Catylac, Interior Cat tembok SPC Emulsion
94 Cat vernis kg Rp 19,500.00
95 Closed duduk (lokal) buah Rp 953,820.00 TOTO, CW420J/SW420JP,White/Ivory
96 Closed jongkok keramik buah Rp 145,000.00
97 Closed jongkok porcelaint (lokal) buah Rp 119,175.00 TOTO, Any Colour (Warna selain putih)
98 Closed jongkok terasso buah Rp 135,000.00
99 Conblock (C.B. 10) buah Rp 39,500.00
No. URAIAN / NAMA / JENIS BARANG SATUAN HARGA SATUAN (Rp) TYPE/MERK/SPESIFIKASI

1 2 3 4 5
100 Conblock (C.B. 15) buah Rp 32,500.00
101 Conblock tebal 6 cm m² Rp 93,900.00 Segi enam 6 cm, 4,8 kg, Abu-abu
102 Conblock tebal 8 cm m² Rp 44,500.00
103 Dempul kg Rp 34,870.00 Vinilex / Sanpolar
104 Dina bolt / ramset buah Rp 1,250.00
105 Dop PVC ø 50 mm unit Rp 79,500.00
106 Elastromer bearing pad - Rp 805,000.00
107 Elektroda penghantar bumi untuk penangkal petir buah Rp 280,000.00
108 Engsel pintu / jendela 3" buah Rp 8,500.00
109 Engsel jendela buah Rp 5,310.00 Unilon
110 Engsel pintu buah Rp 8,968.00 Unilon standar besar 5"
111 Engsel pintu kaca 10 mm set Rp 6,000.00
112 Engsel putar jendela / ventilasi buah Rp 51,000.00
113 Eternit asbes uk. 1 x 1 (m), tebal 4 mm m² Rp 14,784.00 120 x 120 cm, t = 4 mm
114 Eternit asbes uk. 1 x 1 (m), tebal 5 mm m² Rp 19,500.00
115 Eternit asbes uk. 1 x 1 (m), tebal 6 mm m² Rp 21,000.00
116 Exspanoglet lembar Rp 75,000.00
117 Fibre Plat 0,60 x 1,20 (m), tebal 4 mm m² Rp 19,500.00
118 Fibre Plat 1,20 x 2,40 (m), tebal 4 mm m² Rp 20,000.00
119 Floor drain buah Rp 27,405.00
120 Formica 4" x 8" lbr Rp 45,000.00
121 Gate valve / stop kran ø 1 (inch) kuningan buah Rp 6,500.00
122 Gate valve / stop kran ø 1/2 (inch) kuningan buah Rp 4,500.00
123 Gate valve / stop kran ø 100 (mm) buah Rp 1,505,000.00
124 Gate valve / stop kran ø 3/4 (inch) kuningan buah Rp 9,500.00
125 Grease (minyak gemuk) kg Rp 24,500.00
126 Grendel (biasa) buah Rp 11,500.00
127 Grendel (istimewa) buah Rp 89,500.00
128 Gypsum board motif uk. 1.22 x 2.44 (m), tebal 9 mm lembar Rp 66,000.00
129 Gypsum board polos uk. 1.22 x 2.44 (m), tebal 9 mm lembar Rp 54,000.00
130 Handle jendela buah Rp 21,500.00
131 Handle pintu buah Rp 21,500.00
132 Handle untuk meubelair (furniture) + kunci buah Rp 36,500.00
133 Handle untuk pintu kaca lebar buah Rp 1,250,000.00
134 Hollow block (H.B. 10) buah Rp 32,500.00
135 Hollow block (H.B. 15) buah Rp 35,500.00
136 Hollow block (H.B. 20) buah Rp 42,500.00
137 Hook buah Rp 11,500.00
138 Jendela besi m² Rp 228,000.00
139 Jendela nako (kerangka + kaca 5 mm) m² Rp 135,000.00
140 Kabel biasa m' Rp 2,950.00
141 Kabel bulat m' Rp 4,150.00
142 Kabel listrik NYY 4 x 2,5 mm² m' Rp 4,950.00
143 Kabel listrik NYY 4 x 4 mm² m' Rp 10,500.00
144 Kabel slink m' Rp 26,500.00
145 Kaca bening tebal 12 mm m² Rp 111,500.00
146 Kaca bening tebal 3 mm m² Rp 89,748.00
147 Kaca bening tebal 5 mm m² Rp 100,980.00
148 Kaca bening tebal 8 mm m² Rp 154,872.00
149 Kaca gelap (ray band) tebal 10 mm m² Rp 127,000.00
150 Kaca gelap (ray band) tebal 12 mm m² Rp 126,500.00
151 Kaca gelap (ray band) tebal 5 mm m² Rp 125,000.00
152 Kain kassa kg Rp 16,500.00
153 Kait angin (biasa) buah Rp 8,614.00
154 Kait angin (istimewa) buah Rp 9,500.00
155 Kapur bakar m³ Rp 57,500.00
156 Kapur sirih kg Rp 21,000.00
157 Karpet talang, lebar 0,60 m' m' Rp 8,500.00
158 Kawat nyamuk logam m² Rp 15,000.00
159 Kawat nyamuk plastik m² Rp 14,000.00
160 Kawat berduri kg Rp 3,450.00
161 Kawat beton kg Rp 14,950.00
162 Kawat bronjong kg Rp 71,500.00
163 Kawat burung m² Rp 13,000.00
164 Kawat harmonika m² Rp 17,135.00 4 cm
165 Kawat kassa / kawat loket m² Rp 11,000.00
166 Kawat seng polos kg Rp 19,435.00 2,7 - 3 mm
167 Kayu bakar m³ Rp 65,000.00
168 Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau batang Rp 10,400.00 ukuran 8/10
169 Kayu gergajian kelas II, balok m³ Rp 3,435,300.00 Kayu meranti biasa
170 Kayu gergajian kelas II, papan m³ Rp 3,722,000.00 Kayu meranti biasa
171 Kayu gergajian kelas II, profil m' Rp 11,165.00 List profile kayu meranti B9
172 Kayu gergajian kelas III, balok m³ Rp 1,395,000.00
No. URAIAN / NAMA / JENIS BARANG SATUAN HARGA SATUAN (Rp) TYPE/MERK/SPESIFIKASI

1 2 3 4 5
173 Kayu gergajian kelas III, papan m³ Rp 1,395,000.00
174 Kayu gergajian kelas III, profil m' Rp 5,750.00
175 Kayu gergajian kelas IV, balok m³ Rp 1,486,500.00
176 Kayu gergajian kelas IV, papan m³ Rp 1,651,700.00
177 Kayu untuk konstruksi jembatan m³ Rp 2,400,000.00
178 Kayu untuk perancah m³ Rp 1,761,800.00
179 Keramik 10 x 20 (cm) gelap m² Rp 45,000.00
180 Keramik 10 x 20 (cm) polos m² Rp 42,000.00
181 Keramik 10 x 20 (cm) terang m² Rp 42,000.00
182 Keramik 20 x 20 (cm) polos m² Rp 42,500.00
Keramik 20 x 25 (cm) terang m² Rp 50,715.00 Ikad 20 x 25 warna muda
183 Keramik 20 x 25 (cm) gelap m² Rp 60,835.00 Ikad 20 x 25 warna tua

KIA Ceramics, Ukuran : 30 x 30, Bricko Terracota,


187 Keramik 30 x 30 (cm) putih / berwarna m² Rp 48,185.00 KW. I

188 Keramik 40 x 40 (cm) putih / berwarna m² Rp 51,980.00 Platinum, Uk : 40 x 40, Whisky Cream, Grade A

189 Keramik KM/WC anti slip 20 x 20 (cm) m² Rp 42,500.00


190 Knee / elbow PVC 1(inch) buah Rp 3,500.00
191 Knee / elbow PVC 1/2 (inch) buah Rp 1,750.00
192 Knee / elbow PVC 3/4 (inch) buah Rp 2,100.00
193 Kompon gypsum lembar Rp 27,000.00
194 Kran air stainless buah Rp 29,190.00 Lokal Kait
195 Kran air ø 1,50 (inch) buah Rp 27,500.00
196 Kuas roll buah Rp 36,080.00 Aceoldfields-Allpaint, Roller untuk cat tembok
197 Kuas uk. 1" buah Rp 2,420.00 Aceoldfields, Sun Brush, Ukuran : 1"
198 Kuas uk. 1,5" buah Rp 2,420.00 Aceoldfields, Sun Brush, Ukuran : 1,5"
199 Kuas uk. 3" buah Rp 8,360.00 Aceoldfields, Sun Brush, Ukuran : 3"
200 Kunci jendela (lokal) set Rp 15,000.00
201 Kunci pintu (biasa) set Rp 85,000.00
202 Kunci pintu (istimewa) set Rp 135,000.00
203 Kunci pintu untuk meubelair (furniture) set Rp 23,000.00
204 Kunci tanam buah Rp 75,000.00
205 Kusen pintu / jendela alumunium 3" m² Rp 90,000.00
206 Kusen pintu / jendela alumunium 4" m² Rp 105,000.00
207 Lampu taman 20 W + aksesoris titik Rp 115,000.00
208 Lampu taman triple 20 W + aksesoris titik Rp 230,000.00
209 Lampu TL 20 W + aksesoris titik Rp 89,500.00
210 Lampu TL 40 W + aksesoris titik Rp 132,000.00
211 Lampu TL bulat 10 W + aksesoris titik Rp 75,500.00
212 Lampu TL bulat 20 W + aksesoris titik Rp 102,000.00
213 Langit-langit Accoustic board / tile uk. 0,30 x 0,30 (m) m² Rp 39,000.00
214 Langit-langit Accoustic board / tile uk. 0,30 x 0,60 (m) m² Rp 40,000.00
215 Langit-langit Accoustic board / tile uk. 0,60 x 1,20 x 0,14 (m) m² Rp 45,000.00
216 Langit-langit Accoustic board / tile uk. 0,60 x 1,20 x 0,15 (m) m² Rp 51,000.00
217 Lem (standar Aica Aibond) kg Rp 29,000.00
218 Lem (standar Fox) kg Rp 7,000.00
219 Mata lampu + instalasi titik Rp 41,000.00
220 Meter box (terpasang) titik Rp 331,000.00
221 Minyak bekisting liter Rp 5,500.00
222 Minyak pelarut cat (solvent) liter Rp 16,400.00 Nippon Paint, Nippe Super Thinner
223 Minyak pelumas (oli) liter Rp 25,500.00
224 Minyak solar liter Rp 6,750.00
225 Minyak tanah (industri) liter Rp 6,500.00
226 Multiplek tebal 12 mm 4 x 8 (inch) lembar Rp 165,436.00 12 mm, 120 X 240 cm
227 Multiplek tebal 15 mm 4 x 8 (inch) lembar Rp 204,612.00 15 mm, 120 X 240 cm
228 Multiplek tebal 18 mm 4 x 8 (inch) lembar Rp 230,690.00 18 mm, 120 X 240 cm
229 Multiplek tebal 6 mm uk. 1.22 x 2.44 (m) lembar Rp 80,476.00 6 mm, 120 X 240 cm
230 Multiplek tebal 9 mm 4 x 8 (inch) lembar Rp 120,832.00 9 mm, 120 X 240 cm
231 Paku anti Karat kg Rp 21,500.00
232 Paku asbes kg Rp 17,490.00 5 cm / 7 cm bentuk payung
233 Paku berbagai ukuran (1/2" - 1") kg Rp 16,390.00 Kayu / Triplek 1 - 4 cm
234 Paku berbagai ukuran (2" - 5") kg Rp 10,230.00 Kayu / Triplek 5 - 12 cm
235 Paku jembatan kg Rp 31,000.00
236 Paku kait bh Rp 950.00
237 Paku sekrup bh Rp 990.00 1/8 - 3/4
238 Paku seng kg Rp 16,390.00 7 cm
239 Paku tembok kg Rp 15,000.00
240 Panel listrik / MCB, 1 group / fase buah Rp 87,500.00
241 Panel listrik / MCB, 2 group / fase buah Rp 112,000.00
242 Panel listrik / MCB, 3 group / fase buah Rp 115,000.00
243 Panel listrik / MCB, 4 group / fase buah Rp 155,000.00
244 Parquette lantai m² Rp 85,000.00
245 Pasir ayak untuk beton m³ Rp 194,600.00
246 Pasir pasang m³ Rp 182,000.00
No. URAIAN / NAMA / JENIS BARANG SATUAN HARGA SATUAN (Rp) TYPE/MERK/SPESIFIKASI

1 2 3 4 5
247 Pasir urug / timbun m³ Rp 182,000.00
248 Pembersih / cleaner untuk keramik / porcelaint kg Rp 500.00
249 Pintu alumunium - swing + door closer unit Rp 1,335,000.00
250 Pintu alumunium - swing + floorhinge unit Rp 2,011,000.00
251 Pintu besi m² Rp 235,000.00
252 Pintu besi lipat m² Rp 278,000.00
253 Pipa besi galvanis ø 0,5 (inch) m' Rp 18,500.00
254 Pipa besi galvanis ø 0,75 (inch) m' Rp 24,100.00
255 Pipa besi galvanis ø 1 (inch) m' Rp 37,180.00
256 Pipa besi galvanis ø 1,25 (inch) m' Rp 48,000.00
257 Pipa besi galvanis ø 1,5 (inch) m' Rp 55,480.00
258 Pipa besi galvanis ø 2 (inch) m' Rp 76,240.00
259 Pipa besi galvanis ø 4 (inch) m' Rp 234,560.00
260 Pipa beton ø 20 cm, panjang 1 m' buah Rp 64,000.00
261 Pipa beton ø 60 cm, panjang 1 m' buah Rp 105,500.00
262 Pipa PVC ø 1(inch) AW, panjang 4 m m' Rp 7,170.00 Wavin PVC, STD AW ukuran : 1" (4 m)
263 Pipa PVC ø 1,5 (inch) AW, panjang 4 m m' Rp 12,780.00 Wavin PVC, STD AW ukuran : 1,5" (4 m)
264 Pipa PVC ø 1/2 (inch) AW, panjang 4 m m' Rp 4,050.00 Wavin PVC, STD AW ukuran : 1/2" (4 m)
265 Pipa PVC ø 3 (inch) AW, panjang 4 m m' Rp 31,800.00 Wavin PVC, STD AW ukuran : 3" (4 m)
266 Pipa PVC ø 3/4 (inch) AW, panjang 4 m m' Rp 5,310.00 Wavin PVC, STD AW ukuran : 3/4" (4 m)
267 Pipa PVC ø 4 (inch) AW, panjang 4 m m' Rp 52,680.00 Wavin PVC, STD AW ukuran : 4" (4 m)
268 Plamuer kg Rp 10,920.00 Plamir tembok, Matex
269 Plint ubin abu-abu 15 x 20 (cm) buah Rp 4,700.00
270 Plywood uk. 0,30 x 0,60 (m), tebal 4mm lembar Rp 41,500.00
271 Plywood uk. 0,30 x 0,60 (m), tebal 6mm lembar Rp 45,000.00
272 Plywood uk. 0,60 x 1,20 (m), tebal 4mm lembar Rp 44,000.00
273 Plywood uk. 0,60 x 1,20 (m), tebal 6mm lembar Rp 65,000.00
274 Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar Rp 69,000.00
275 Plywood uk. 1,22 x 2,44 (m), tebal 9 mm lembar Rp 74,000.00
276 Pompa air (dengan otomatis) buah Rp 403,000.00
277 Pompa air (jet pump) buah Rp 503,000.00
278 Pompa air (non otomatis) buah Rp 278,000.00
279 Porcelaint uk. 11 cm x 11 cm buah Rp 875.00
280 Railing tangga stainless steel pipa dia. 2" dan 1" m' Rp 653,000.00
281 Rangka / frame accoustic board - cross tee m' Rp 26,000.00
282 Rangka / frame accoustic board - main tee m' Rp 31,500.00
283 Rangka / frame accoustic board - rod / adjustable dia. 4 mm m' Rp 15,000.00
284 Rangka / frame accoustic board - wall angle m' Rp 35,000.00
285 Rapidrant kg Rp 1,900.00
286 Reducer PVC dari 1/2 (inch) ke 1 (inch) buah Rp 5,750.00
287 Reducer PVC dari 1/2 (inch) ke 3/4 (inch) buah Rp 7,950.00
288 Reducer PVC dari 3/4 (inch) ke 1 (inch) buah Rp 6,850.00
289 Residu liter Rp 2,415.00
290 Rolling dor - alumunium tebal m² Rp 228,000.00
291 Rolling dor - alumunium tipis m² Rp 188,000.00
292 Rooflight fibreglass uk. 1,8 x 0,9 (m) lembar Rp 70,000.00
293 Rooster block uk. 12 x 11 x 24 (cm) buah Rp 5,800.00
294 Rooster block uk. 20 x 20 (cm) buah Rp 6,100.00
295 Saklar buah Rp 20,900.00 Broco- Plano (Seri)
296 Saklar dobel buah Rp 23,100.00 Broco- Plano (Tunggal)
297 Saklar engkel buah Rp 17,850.00
298 Semen PC @ 50 kg kg Rp 984.00 Tiga Roda Portland, per sak : 50 kg
299 Semen putih kg Rp 1,660.00 Tiga Roda Portland, Putih per sak : 40 kg
300 Semen warna kg Rp 9,200.00 Warna, 1 kg
301 Seng fibreglass lembar Rp 38,000.00
302 Seng plat BJLS 27 uk. 0.3 x 1.83 (m) lembar Rp 32,000.00
303 Seng plat BJLS 27 uk. 0.9 x 1.83 (m) lembar Rp 40,000.00
304 Sherra block buah Rp 1,450.00
305 Sirtu m³ Rp 106,500.00
306 Slot jendela buah Rp 7,906.00
307 Slot pintu buah Rp 9,000.00
308 Slot ventilasi / bouwvenlight buah Rp 8,500.00
309 Socket PVC ø 1 (inch) buah Rp 6,000.00
310 Socket PVC ø 1/2 (inch) buah Rp 6,850.00
311 Socket PVC ø 3/4 (inch) buah Rp 5,000.00
312 Softboard uk. 1,20 x 2,40 (m), tebal 4 mm lembar Rp 35,000.00
313 Stone Coating kg Rp 15,700.00
314 Stop kontak + instalasi titik Rp 125,200.00
315 Streorox - 100 kg Rp 5,300.00
316 Sunscreen alumunium m² Rp 45,000.00
317 Tangki air / hydrant umum fiberglass 1.000 liter buah Rp 1,818,000.00
318 Tangki air / hydrant umum fiberglass 2.000 liter buah Rp 3,919,000.00
319 Tangki air / hydrant umum fiberglass 3.000 liter buah Rp 5,503,000.00
No. URAIAN / NAMA / JENIS BARANG SATUAN HARGA SATUAN (Rp) TYPE/MERK/SPESIFIKASI

1 2 3 4 5
320 Tangki air / hydrant umum fiberglass 6.000 liter (horizontal) buah Rp 16,750,500.00
321 Tangki air / hydrant umum polyethylene 1.000 liter buah Rp 1,585,000.00
322 Tangki air / hydrant umum polyethylene 2.000 liter buah Rp 3,600,000.00
323 Tangki air / hydrant umum polyethylene 3.000 liter buah Rp 4,790,000.00
324 Tangki air / hydrant umum polyethylene 4.000 liter buah Rp 6,120,000.00
325 Tangki air / hydrant umum polyethylene 5.000 liter buah Rp 7,155,000.00
326 Tangki air / hydrant umum polyethylene 500 liter buah Rp 680,000.00
327 Tangki air fiberglass (oranye) 1.000 liter buah Rp 850,000.00
328 Tangki air fiberglass (oranye) 2.000 liter buah Rp 950,000.00
329 Tangki air fiberglass (oranye) 3.000 liter buah Rp 1,000,000.00
330 Tangki air fiberglass (oranye) 500 liter buah Rp 550,000.00
331 Teak wood 0,30 x 0,60 (m), tebal 4 mm lembar Rp 42,500.00
332 Teak wood 0,90 x 2,10 (m), tebal 4 mm lembar Rp 60,000.00
333 Teak wood 1,20 x 2,40 (m), tebal 4 mm lembar Rp 80,000.00
334 Tee all socket PVC ø 100 x 50 (mm) unit Rp 355,000.00
335 Tee all socket PVC ø 225 x 100 (mm) unit Rp 355,000.00
336 Tee all socket PVC ø 50 x 50 (mm) unit Rp 180,000.00
337 Tee all socket PVC ø 80 x 50 (mm) unit Rp 280,000.00
338 Tempat sabun keramik buah Rp 36,700.00 TOTO S11N
339 Ter kg Rp 12,660.00
340 Timbunan biasa m³ Rp 45,000.00 (Galian C)
341 Timbunan pilihan / tanah puru m³ Rp 100,000.00 CBR diatas 6
342 Triplek tebal 2.5 mm uk. 1.22 x 2.44 (m) lembar Rp 47,500.00
343 Triplek tebal 4 mm uk. 1.22 x 2.44 (m) lembar Rp 59,000.00
344 Ubin abu-abu 20 x 20 (cm) buah Rp 3,000.00
345 Ubin berwarna 20 x 20 (cm) buah Rp 3,500.00
346 Ubin motif (mozaik) m² Rp 105,000.00
347 Ubin wafel buah Rp 2,900.00
348 Urinoir terasso Unit Rp 925,000.00
349 Venetion blinds m² Rp 67,500.00
350 Vernis kg Rp 19,500.00
351 Vertical blinds m² Rp 5,250.00
352 Wallpaper bermotif m² Rp 38,000.00
353 Wallpaper polos m² Rp 33,000.00
354 Wastafel buah Rp 130,000.00
355 Water meter ø 1 (inch) + pipa GIP unit Rp 485,000.00

C. PERALATAN (BIAYA PEMILIKAN DAN OPERASI)

1 Bulldozer jam Rp 366,879.67


2 Motor grader jam Rp 295,141.60
3 Pemecah batu jam Rp 560,966.59
4 Mesin penyaring jam Rp 219,453.44
5 Wheel loader jam Rp 258,472.28
6 Wheel tractor jam Rp 95,007.69
7 Mesin gilas roda 3 jam Rp 105,493.10
8 Mesin gilas tandem jam Rp 168,786.66
9 Mesin gilas bergetar 6 - 7 ton jam Rp 205,625.99
10 Mesin gilas bergetar 8 - 15 ton jam Rp 261,724.08
11 Mesin gilas bergetar 1 ton jam Rp 49,371.71
12 Tamper / handy compactor jam Rp 8,739.27
13 Alat penggetar beton jam Rp 6,642.70
14 Mesin penyemprot aspal 1.000 liter jam Rp 79,621.99
15 Mesin penyemprot aspal 400 liter jam Rp 22,852.26
16 Mesin penyampur aspal 30 T / J + generator jam Rp 878,315.88
17 Mesin penghampar aspal jam Rp 132,283.96
18 Truk tangki air jam Rp 112,584.65
19 Trailer 1 Ton jam Rp 10,900.72
20 Dump truck 3,5 Ton jam Rp 132,862.10
21 Dump truck 5,0 Ton jam Rp 166,679.50
22 Truk bak terbuka 3,5 Ton jam Rp 119,301.42
23 Mesin pengaduk beton 125 liter jam Rp 9,803.87
24 Mesin pengaduk beton 250 liter jam Rp 32,541.46
25 Mesin pengaduk beton 500 liter jam Rp 65,082.92
26 Compressor 210 m3 / jam jam Rp 53,717.32
27 Pompa air 5 cm, 30 m3 / jam jam Rp 8,105.79
28 Peralatan traktor jam Rp 46,919.89
DAFTAR
DAFTAR HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
BIDANG KONSTRUKSI KOTA PANGKALPINANG
TAHUN ANGGARAN 2009
( Harga Tidak Termasuk PPN)

HARGA SATUAN HARGA SATUAN


No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

A. UPAH

1 Mandor oh Rp 90,000.00 Rp 90,000.00


2 Mekanik oh Rp 100,000.00 Rp 100,000.00
3 Mekanik pembantu oh Rp 60,000.00 Rp 60,000.00
4 Kepala tukang oh Rp 85,000.00 Rp 85,000.00
5 Tukang batu oh Rp 100,000.00 Rp 100,000.00
6 Tukang kayu oh Rp 100,000.00 Rp 100,000.00
7 Tukang besi / tukang las oh Rp 100,000.00 Rp 100,000.00
8 Tukang cat oh Rp 100,000.00 Rp 100,000.00
9 Tukang listrik oh Rp 100,000.00 Rp 100,000.00
10 Tukang ledeng / pipa oh Rp 100,000.00 Rp 100,000.00
11 Tukang gali sumur oh Rp 100,000.00 Rp 100,000.00
12 Operator terlatih oh Rp 100,000.00 Rp 100,000.00
13 Operator kurang terlatih oh Rp 100,000.00 Rp 100,000.00
14 Pembantu operator oh Rp 100,000.00 Rp 100,000.00
15 Supir material / truck oh Rp 100,000.00 Rp 100,000.00
16 Supir personil / mobil ringan oh Rp 100,000.00 Rp 100,000.00
17 Pembantu supir / kenek oh Rp 100,000.00 Rp 100,000.00
18 Pekerja terlatih oh Rp 100,000.00 Rp 100,000.00
19 Pekerja agak terlatih oh Rp 100,000.00 Rp 100,000.00
20 Pekerja tak terlatih oh Rp 100,000.00 Rp 100,000.00
21 Penjaga oh Rp 100,000.00 Rp 100,000.00
22 Pemasak aspal oh Rp 100,000.00 Rp 100,000.00
23 Pengangkut air oh Rp 100,000.00 Rp 100,000.00

B. MATERIAL/BAHAN

1 Alang-alang ikat Rp 1,500.00


2 Alat-alat bantu** set Rp 134,900.00 Rp 134,900.00
3 All socket reducer PVC ø 100 x 80 (mm) unit Rp 75,000.00 Rp 75,000.00
4 All socket reducer PVC ø 80 x 50 (mm) unit Rp 50,000.00 Rp 50,000.00
5 Aluminium foil m² Rp 92,000.00 Rp 92,000.00
6 Amplas lembar Rp 11,600.00 Rp 11,600.00
7 Aspal bitumen kg Rp 12,330.36 Rp 12,330.36
8 Atap alumunium super sheet uk. 1,8 x 6 (m), t = 0,2 mm (berwarna) m² Rp 265,800.00 Rp 265,800.00
9 Atap asbes gelombang uk. 1,50 x 0,90 (m) tebal 4 mm lembar Rp 36,814.70 Rp 36,814.70
10 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm lembar Rp 71,500.00 Rp 71,500.00
11 Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 6 mm lembar Rp 107,200.00 Rp 107,200.00
12 Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm lembar Rp 41,000.00 Rp 41,000.00
13 Atap asbes gelombang uk. 1,80 x 1,05 (m) tebal 4 mm lembar Rp 78,500.00 Rp 78,500.00
14 Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm lembar Rp 55,500.00 Rp 55,500.00
15 Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm lembar Rp 114,400.00 Rp 114,400.00
16 Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm lembar Rp 91,600.00 Rp 91,600.00
17 Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm lembar Rp 137,100.00 Rp 137,100.00
18 Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm lembar Rp 128,700.00 Rp 128,700.00
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

19 Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm lembar Rp 96,400.00 Rp 96,400.00
20 Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm lembar Rp 144,600.00 Rp 144,600.00
21 Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm lembar Rp 143,000.00 Rp 143,000.00
22 Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm lembar Rp 116,700.00 Rp 116,700.00
23 Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm lembar Rp 175,000.00 Rp 175,000.00
24 Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm lembar Rp 126,800.00 Rp 126,800.00
25 Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm lembar Rp 189,700.00 Rp 189,700.00
26 Foldimg Gate ( tebal 2 mm ) m2 Rp 733,471.20 Rp 733,471.20
27 Folding Gate ( tebal 3 mm ) m2 Rp 900,169.20 Rp 900,169.20
28 Atap genteng (standar KIA) lembar Rp 14,300.00 Rp 14,300.00
29 Atap genteng beton ( jenis press) buah Rp 4,961.25 Rp 4,961.25
30 Atap genteng kodok buah Rp 3,150.00 Rp 3,150.00
31 Atap genteng soka buah Rp 2,646.00 Rp 2,646.00
32 Atap metal (biasa / polos) lembar Rp 88,300.00 Rp 88,300.00
33 Atap metal batuan /tekstur lembar Rp 97,100.00 Rp 97,100.00
34 Atap seng fibreglass tebal lembar Rp 158,000.00 Rp 158,000.00
35 Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) lembar Rp 74,800.00 Rp 74,800.00
36 Air Release Valve dia 25 mm Unit Rp 2,193,411.78 Rp 2,193,411.78
37 Air Release Valve dia 50 mm Unit Rp 2,741,848.20 Rp 2,741,848.20
38 Gorong-gorong/Buis beton dia "100 m' Rp 1,134,000.00 Rp 1,134,000.00
39 Gorong-gorong/Buis beton dia "80 m' Rp 913,500.00 Rp 913,500.00
40 Gorong-gorong/Buis beton dia "60 m' Rp 693,000.00 Rp 693,000.00
41 Bak cuci piring (sink) stainless steel 1 lobang buah Rp 321,200.00 Rp 321,200.00
42 Bak cuci piring (sink) stainless steel 2 lobang buah Rp 644,200.00 Rp 644,200.00
43 Bak mandi fibreglass volume 0,15 m³ buah Rp 317,700.00 Rp 317,700.00
44 Bak mandi fibreglass volume 0,30 m³ buah Rp 353,000.00 Rp 353,000.00
45 Bak mandi fibreglass volume 1,00 m³ buah Rp 494,200.00 Rp 494,200.00
46 Bak mandi jenis bathtub buah Rp 1,750,000.00 Rp 1,750,000.00
47 Bataco buah Rp 2,115.00 Rp 2,115.00
48 Batacote m² Rp 61,800.00 Rp 61,800.00
49 Batu alam tempel m² Rp 441,300.00 Rp 441,300.00
50 Batu apung m³ Rp 270,000.00 Rp 270,000.00
51 Batu paving Lokal Segi Empat semua ukuran buah Rp 3,900.00 Rp 3,900.00
52 Batu bata Kls I bh Rp 3,300.00 Rp 3,300.00
53 Batu bata Kls II bh Rp 9,000.00 Rp 9,000.00
54 Batu bata merah bh Rp 9,000.00 Rp 9,000.00
55 Batu belah 10 - 15 (cm) m³ Rp 500,000.00 Rp 500,000.00
56 Batu belah 15 - 20 (cm) m³ Rp 500,000.00 Rp 500,000.00
57 Batu gunung (quarry) m³ Rp 494,000.00 Rp 494,000.00
58 Batu kali bulat +>15" m³ Rp 400,000.00 Rp 400,000.00
59 Batu karang m³ Rp 400,000.00 Rp 400,000.00
60 Batu kerikil ayak / batu saring / kerai m³ Rp 720,000.00 Rp 720,000.00
61 Batu kerikil Beton 2/3 m³ Rp 429,000.00 Rp 429,000.00
62 Batu kerikil Beton 1/2 m³ Rp 429,000.00 Rp 429,000.00
63 Batu kerikil Kasar 3/5 m² Rp 494,000.00 Rp 494,000.00
64 Batu kerikil Halus 0,1 -1 cm m3 Rp 388,300.00 Rp 388,300.00
65 Batu pecah 0,5 - 1 (cm) m³ Rp 374,125.00 Rp 374,125.00
66 Batu pecah 1 - 2 (cm) m³ Rp 446,516.67 Rp 446,516.67
67 Batu pecah 2 - 3 (cm) m³ Rp 455,520.00 Rp 455,520.00
68 Batu pecah 3 - 5 (cm) m³ Rp 455,520.00 Rp 455,520.00
69 Batu pecah 5 - 7 (cm) m³ Rp 601,397.36 Rp 601,397.36
70 Batu pecah 7 - 10 (cm) m³ Rp 291,200.00 Rp 291,200.00
71 Batu teraso m³ Rp 185,300.00 Rp 185,300.00
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

72 Baut / mur baja buah Rp 10,600.00 Rp 10,600.00


73 Baut klem buah Rp 7,900.00 Rp 7,900.00
74 Bensin premium liter Rp 5,670.00 Rp 5,670.00
75 Besi baja profil IWF kg Rp 44,100.00 Rp 44,100.00
76 Besi baut kuda-kuda kg Rp 19,800.00 Rp 19,800.00
77 Besi beton kg Rp 27,000.00 Rp 27,000.00
4" kg Rp 1,981.00 Rp 1,981.00
5" kg Rp 2,588.00 Rp 2,588.00
6" kg Rp 3,750.00 Rp 3,750.00
8" kg Rp 7,750.00 Rp 7,750.00
10" kg Rp 8,750.00 Rp 8,750.00
12" kg Rp 13,848.00 Rp 13,848.00
14" kg Rp 15,021.00 Rp 15,021.00
16" kg Rp 22,147.00 Rp 22,147.00
19" kg Rp 32,292.00 Rp 32,292.00
22" kg Rp 40,979.00 Rp 40,979.00
25" kg Rp 53,500.00 Rp 53,500.00
78 Besi Plat 2 mm" 120x240 m 2
Rp 318,000.00 Rp 318,000.00
79 Besi Plat 3 mm" 120x241 kg Rp 312,000.00 Rp 312,000.00
80 Besi siku 6 m' Rp 315,945.00 Rp 315,945.00
81 Besi strip kg Rp 53,550.00 Rp 53,550.00
82 Kawat duri roll Rp 450,000.00 Rp 450,000.00
83 Kawat Duri Kg Rp 117,000.00 Rp 117,000.00
84 Besi strip 2 x 3 m' Rp 29,100.00 Rp 29,100.00
85 Bend C1 dia 200 mm x 45 ff m' Rp 651,622.86 Rp 651,622.86
86 Bend C1 dia 200 mm x 90 ff m' Rp 1,645,142.94 Rp 1,645,142.94
87 Bend PVC 100 x 90 Unit Rp 626,618.16 Rp 626,618.16
88 Bend PVC 150 x 90 Unit Rp 822,487.68 Rp 822,487.68
89 Bend PVC 50 x 90 Unit Rp 182,701.26 Rp 182,701.26
90 Bend PVC 80 x 90 Unit Rp 274,051.26 Rp 274,051.26
91 Besi teralis ø 6 mm - 10 mm m' Rp 29,100.00 Rp 29,100.00
92 Bilik bambu kering, uk. 1,5 x 4 (m) buah Rp 61,800.00 Rp 61,800.00
93 Bliksem spit penangkal petir buah Rp 101,500.00 Rp 101,500.00
94 Bondbeam uk. 40 x 20 x 20 (cm) buah Rp 64,400.00 Rp 64,400.00
95 Box sekering, 1 goup / phase buah Rp 59,800.00 Rp 59,800.00
96 Box sekering, 2 goup / phase buah Rp 182,000.00 Rp 182,000.00
97 Box sekering, 3 goup / phase buah Rp 82,300.00 Rp 82,300.00
98 Box sekering set Rp 56,700.00 Rp 56,700.00
99 Box Water Meter bh Rp 44,100.00 Rp 44,100.00
100 Bola lam pijar bh Rp 6,300.00 Rp 6,300.00
101 Bola lampu TL.20 W bh Rp 28,350.00 Rp 28,350.00
102 Bubungan atap (nok) alumunium standar 40 cm, swg. 22 m² Rp 85,600.00 Rp 85,600.00
103 Bubungan atap (nok) asbes sepasang lembar Rp 61,800.00 Rp 61,800.00
104 Bubungan atap (nok) genteng (standar KIA) buah Rp 43,200.00 Rp 43,200.00
105 Bubungan atap (nok) genteng beton buah Rp 5,433.75 Rp 5,433.75
106 Bubungan atap (nok) genteng kodok buah Rp 7,200.00 Rp 7,200.00
107 Bubungan atap (nok) genteng soka buah Rp 4,680.00 Rp 4,680.00
108 Bubungan atap (nok) metal (biasa / polos) buah Rp 37,100.00 Rp 37,100.00
109 Bubungan atap (nok) metal (standar Rainbow) m' Rp 69,700.00 Rp 69,700.00
110 Buis beton bertulang ø 45 cm - 75 cm buah Rp 494,200.00 Rp 494,200.00
111 Buis beton bertulang ø 75 cm - 120 cm buah Rp 1,147,300.00 Rp 1,147,300.00
112 Buis beton tak bertulang ø 100 cm buah Rp 460,700.00 Rp 460,700.00
113 Buis beton tak bertulang ø 60 cm buah Rp 105,000.00 Rp 105,000.00
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

114 Buis beton tak bertulang ø 80 cm buah Rp 460,700.00 Rp 460,700.00


115 Cat besi merk "GENDANG" kg Rp 22,176.00 Rp 22,176.00
116 Cat besi merk "PLATONE" kg Rp 50,793.75 Rp 50,793.75
117 Cat dasar kg Rp 32,700.00 Rp 32,700.00
118 Cat genteng kg Rp 30,693.60 Rp 30,693.60
119 Cat jalan kg Rp 63,800.00 Rp 63,800.00
120 Cat jembatan kg Rp 64,400.00 Rp 64,400.00
121 Cat menie kg Rp 18,405.00 Rp 18,405.00
122 Cat kayu kg Rp 42,840.00 Rp 42,840.00
123 Cat minyak kg Rp 59,062.50 Rp 59,062.50
124 Cat tembok kg Rp 24,680.00 Rp 24,680.00
125 Cat tembok merk "GALATEK" kg Rp 9,648.95 Rp 9,648.95
126 Cat tembok merk "KENLUX" kg Rp 16,443.00 Rp 16,443.00
127 Cat tembok merk "PLATON" kg Rp 15,172.50 Rp 15,172.50
128 Cat tembok merk "SUPERKEN" kg Rp 12,810.00 Rp 12,810.00
129 Cat vernis kg Rp 19,500.00 Rp 19,500.00
130 Closed duduk (lokal) buah Rp 2,047,400.00 Rp 2,047,400.00
131 Closed jongkok keramik buah Rp 181,400.00 Rp 181,400.00
132 Closed jongkok porcelaint (lokal) buah Rp 460,000.00 Rp 460,000.00
133 Closed jongkok terasso buah Rp 238,300.00 Rp 238,300.00
134 Closed jongkok keramik leher lurus bh Rp 441,000.00 Rp 441,000.00
135 Closed jongkok keramik leher bengkok bh Rp 143,850.00 Rp 143,850.00
136 Closed duduk keramik uk. Besar bh Rp 2,271,000.00 Rp 2,271,000.00
137 Closed duduk keramik uk. Kecil bh Rp 383,250.00 Rp 383,250.00
138 Clamp saddle C1 dia 50 x 13 mm unit Rp 91,183.68 Rp 91,183.68
139 Clamp saddle C1 dia 80 x 13 mm unit Rp 104,519.52 Rp 104,519.52
140 Clamp saddle PVC dia 50 x 13 mm unit Rp 173,365.92 Rp 173,365.92
141 Clamp saddle PVC dia 80 x 13 mm unit Rp 207,539.64 Rp 207,539.64
142 Conblock (C.B. 10) buah Rp 69,700.00 Rp 69,700.00
143 Conblock (C.B. 15) buah Rp 57,400.00 Rp 57,400.00
144 Conblock tebal 6 cm m² Rp 2,016.00 Rp 2,016.00
145 Conblock tebal 8 cm m² Rp 2,268.00 Rp 2,268.00
146 Dempul kayu kg Rp 40,000.00 Rp 40,000.00
147 Kapur tembok kg Rp 6,510.00 Rp 6,510.00
148 Minyak cat kg Rp 35,000.00 Rp 35,000.00
149 Plamur tembok kg Rp 11,263.00 Rp 11,263.00
150 Dempul Gypsum kg Rp 5,040.00 Rp 5,040.00
151 Dempul jadi kg Rp 146,500.00 Rp 146,500.00
152 Dina bolt / ramset buah Rp 2,200.00 Rp 2,200.00
153 Door stop buah Rp 88,300.00 Rp 88,300.00
154 Dop PVC ø 50 mm unit Rp 41,674.50 Rp 41,674.50
155 Dop Gip dia 13 mm unit Rp 5,000.94 Rp 5,000.94
156 Dop PVC dia 100 mm unit Rp 127,857.24 Rp 127,857.24
157 Dop PVC dia 80 mm unit Rp 74,347.56 Rp 74,347.56
158 Double Nipple Gip dia 13 mm bh Rp 25,200.00 Rp 25,200.00
159 Daun pintu fiber wc polos bh Rp 441,000.00 Rp 441,000.00
160 Daun pintu fiber wc corak bh Rp 630,000.00 Rp 630,000.00
161 Elastromer bearing pad - Rp 1,420,800.00 Rp 1,420,800.00
162 Elektroda penghantar bumi untuk penangkal petir buah Rp 325,500.00 Rp 325,500.00
163 Engsel pintu / jendela 3" buah Rp 15,000.00 Rp 15,000.00
164 Engsel pintu / jendela 4" buah Rp 20,300.00 Rp 20,300.00
165 Engsel pintu / jendela 5" buah Rp 28,200.00 Rp 28,200.00
166 Engsel pintu kaca 10 mm set Rp 10,600.00 Rp 10,600.00
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

167 Engsel putar jendela / ventilasi buah Rp 90,000.00 Rp 90,000.00


168 Engsel kuningan untuk pintu 2 bh Rp 20,370.00 Rp 20,370.00
169 Engsel kuningan untuk jendela 2 bh Rp 14,553.00 Rp 14,553.00
170 Eternit asbes uk. 1 x 1 (m), tebal 4 mm m² Rp 32,700.00 Rp 32,700.00
171 Eternit asbes uk. 1 x 1 (m), tebal 5 mm m² Rp 34,400.00 Rp 34,400.00
172 Eternit asbes uk. 1 x 1 (m), tebal 6 mm m² Rp 37,100.00 Rp 37,100.00
173 Enternit jaber Ment m2 Rp 22,680.00 Rp 22,680.00
174 Exspanoglet lembar Rp 75,000.00 Rp 75,000.00
175 Fibre Plat 1,20 x 2,40 (m), tebal 4 mm m² Rp 84,500.00 Rp 84,500.00
176 Fibre Plat 1,20 x 2,40 (m), tebal 6 mm m² Rp 152,100.00 Rp 152,100.00
177 Fibre Plat 1,20 x 2,40 (m), tebal 8 mm m² Rp 200,900.00 Rp 200,900.00
178 Floor drain buah Rp 28,500.00 Rp 28,500.00
179 Formica 4" x 8" lbr Rp 79,400.00 Rp 79,400.00
180 Flange C1 dia 200 mm bh Rp 136,025.82 Rp 136,025.82
181 Flange Socket PVC dia 200 mm unit Rp 548,436.42 Rp 548,436.42
182 Filler kg Rp 1,512.00 Rp 1,512.00
183 Gate valve / stop kran ø 1 (inch) kuningan buah Rp 11,500.00 Rp 11,500.00
184 Gate valve / stop kran ø 1/2 (inch) kuningan buah Rp 7,900.00 Rp 7,900.00
185 Gate valve / stop kran ø 100 (mm) buah Rp 4,203,957.24 Rp 4,203,957.24
186 Gate valve / stop kran ø 3/4 (inch) kuningan buah Rp 16,800.00 Rp 16,800.00
187 Gate Valve dia 150 + Flange socket unit Rp 5,940,616.36 Rp 5,940,616.36
188 Gate Valve dia 200 mm m' Rp 3,693,861.36 Rp 3,693,861.36
189 Gate Valve dia 50 + Flange socket unit Rp 68,922.00 Rp 68,922.00
190 Gate Valve dia 80 + Flange socket unit Rp 1,761,606.00 Rp 1,761,606.00
191 Gibult Joint dia 200 mm unit Rp 3,324,958.56 Rp 3,324,958.56
192 Glass block uk. 20 x 20 (cm) buah Rp 25,600.00 Rp 25,600.00
193 Grease (minyak gemuk) kg Rp 43,200.00 Rp 43,200.00
194 Grendel (biasa) buah Rp 20,300.00 Rp 20,300.00
195 Grendel (istimewa) buah Rp 158,000.00 Rp 158,000.00
196 Gypsum board motif uk. 1.22 x 2.44 (m), tebal 9 mm lembar Rp 116,500.00 Rp 116,500.00
197 Gypsum board polos uk. 1.22 x 2.44 (m), tebal 9 mm lembar Rp 56,385.00 Rp 56,385.00
198 Grendel kuning bh Rp 8,190.00 Rp 8,190.00
199 Handle jendela buah Rp 37,900.00 Rp 37,900.00
200 Handle pintu buah Rp 37,900.00 Rp 37,900.00
201 Handle untuk meubelair (furniture) + kunci buah Rp 64,400.00 Rp 64,400.00
202 Handle untuk pintu kaca lebar buah Rp 2,206,300.00 Rp 2,206,300.00
203 Hollow block (H.B. 10) buah Rp 57,400.00 Rp 57,400.00
204 Hollow block (H.B. 15) buah Rp 62,700.00 Rp 62,700.00
205 Hollow block (H.B. 20) buah Rp 75,000.00 Rp 75,000.00
206 Hook buah Rp 20,300.00 Rp 20,300.00
207 Huruf Galvanized-Stainless steel m² Rp 402,400.00 Rp 402,400.00
208 Jendela besi m² Rp 402,400.00 Rp 402,400.00
209 Jendela nako (kerangka + kaca 5 mm) m² Rp 238,300.00 Rp 238,300.00
210 Daun jendela alumunium lengkap ( 80 x 120 ) cm bh Rp 503,566.88 Rp 503,566.88
211 Daun pintu alumunium lengkap ( 90 x 120 ) bh Rp 700,000.00 Rp 700,000.00
212 Daun pintu alumunium untuk WC ( 80 x 200 ) bh Rp 882,000.00 Rp 882,000.00
213 Kabel biasa m' Rp 3,400.00 Rp 3,400.00
214 Kabel bulat m' Rp 4,800.00 Rp 4,800.00
215 Kabel listrik NYY 4 x 2,5 mm² m' Rp 5,800.00 Rp 5,800.00
216 Kabel listrik NYY 4 x 4 mm² m' Rp 12,200.00 Rp 12,200.00
217 Kabel NM 2X1 1/2 mm m' Rp 450,000.00 Rp 450,000.00
218 Kabel NM 3X1 1/2 mm m' Rp 525,000.00 Rp 525,000.00
219 Kabel slink m' Rp 30,800.00 Rp 30,800.00
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

220 Kaca ryben tebal 3 mm m² Rp 480,000.00 Rp 480,000.00


221 Kaca ryben tebal 5 mm m² Rp 650,000.00 Rp 650,000.00
222 Kaca bening tebal 3 mm m² Rp 240,000.00 Rp 240,000.00
223 Kaca bening tebal 5 mm m² Rp 272,000.00 Rp 272,000.00
224 Kaca buram tebal 12 mm m² Rp 432,400.00 Rp 432,400.00
225 Kaca cermin tebal 5 mm m² Rp 165,000.00 Rp 165,000.00
226 Kaca cermin tebal 6 mm m² Rp 197,700.00 Rp 197,700.00
227 Kaca cermin tebal 8 mm m² Rp 263,900.00 Rp 263,900.00
228 Kaca gelap (ray band) tebal 10 mm m² Rp 441,300.00 Rp 441,300.00
229 Kaca gelap (ray band) tebal 12 mm m² Rp 529,500.00 Rp 529,500.00
230 Kaca gelap (ray band) tebal 5 mm m² Rp 220,600.00 Rp 220,600.00
231 Kaca naco ryben 5 mm (lengkap) uk. 15 x 17 cm Daun Rp 34,776.00 Rp 34,776.00
232 Kaca ryben 3 m m2 Rp 135,025.38 Rp 135,025.38
233 Kaca ryben 5 m m2 Rp 151,200.00 Rp 151,200.00
234 Kaca patri tebal 5 mm m² Rp 2,137,800.00 Rp 2,137,800.00
235 Kaca wireglass tebal 5 mm m² Rp 874,600.00 Rp 874,600.00
236 Kain kassa kg Rp 16,500.00 Rp 16,500.00
237 Kait angin (biasa) buah Rp 29,000.00 Rp 29,000.00
238 Kait angin (istimewa) buah Rp 16,800.00 Rp 16,800.00
239 Kapur bakar m³ Rp 105,900.00 Rp 105,900.00
240 Kapur sirih kg Rp 37,100.00 Rp 37,100.00
241 Karpet talang, lebar 0,60 m' m' Rp 13,671.00 Rp 13,671.00
242 Kawat nyamuk logam m² Rp 26,500.00 Rp 26,500.00
243 Kawat nyamuk plastik m² Rp 24,700.00 Rp 24,700.00
244 Kawat berduri kg Rp 18,900.00 Rp 18,900.00
245 Kawat beton kg Rp 22,050.00 Rp 22,050.00
246 Kawat bronjong kg Rp 126,200.00 Rp 126,200.00
247 Kawat burung m² Rp 22,900.00 Rp 22,900.00
248 Kawat harmonika m² Rp 109,400.00 Rp 109,400.00
249 Kawat kassa / kawat loket m² Rp 19,400.00 Rp 19,400.00
250 Kawat seng polos kg Rp 20,300.00 Rp 20,300.00
251 Bambu mdl 15 cm btng Rp 23,000.00 Rp 23,000.00
252 Bambu sedang10 cm btng Rp 17,500.00 Rp 17,500.00
253 Bambu kecil 0,5-10 cm btng Rp 12,000.00 Rp 12,000.00
254 Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau m³ Rp 1,650,000.00 Rp 1,650,000.00
255 Kayu gergajian kelas I, Balok m³ Rp 4,500,000.00 Rp 4,500,000.00
256 Kayu gergajian kelas I, Papan m³ Rp 4,500,000.00 Rp 4,500,000.00
257 Kayu gergajian kelas II, Balok m³ Rp 2,500,000.00 Rp 2,500,000.00
258 Kayu gergajian kelas II, Papan 3/25x3 m³ Rp 2,500,000.00 Rp 2,500,000.00
259 Kayu gergajian kelas III, papan m³ Rp 1,750,000.00 Rp 1,750,000.00
260 Kayu gergajian kelas III, Balok m³ Rp 1,750,000.00 Rp 1,750,000.00
261 Kayu gergajian kelas IV, balok m³ Rp 1,919,318.71 Rp 1,919,318.71
262 Kayu gergajian kelas IV, papan m³ Rp 1,676,800.00 Rp 1,676,800.00
263 Kayu untuk konstruksi jembatan m³ Rp 4,236,000.00 Rp 4,236,000.00
264 Kayu untuk perancah m³ Rp 1,209,000.00 Rp 1,209,000.00
265 Keramik 10 x 20 (cm) Kwalitas Sedang m² Rp 68,109.00 Rp 68,109.00
266 Keramik 20 x 20 (cm) Kwalitas Sedang m² Rp 45,000.00 Rp 45,000.00
267 Keramik 20 x 25 (cm) Kwalitas Sedang m² Rp 74,100.00 Rp 74,100.00
268 Keramik 30 x 30 (cm) Kwalitas Sedang m² Rp 48,000.00 Rp 48,000.00
269 Keramik 40 x 40 (cm) Kwalitas Sedang m² Rp 52,000.00 Rp 52,000.00
270 Keramik 10 x 20 (cm) Kwalitas Baik m² Rp 108,000.00 Rp 108,000.00
271 Keramik 20 x 20 (cm) Kwalitas Baik m² Rp 105,000.00 Rp 105,000.00
272 Keramik 20 x 25 (cm) Kwalitas Baik m² Rp 115,000.00 Rp 115,000.00
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

273 Keramik 30 x 30 (cm) Kwalitas Baik m² Rp 102,000.00 Rp 102,000.00


274 Keramik 40 x 40 (cm) Kwalitas Baik m² Rp 125,000.00 Rp 125,000.00
275 Keramik 30 x 30 (cm) putih / berwarna m² Rp 79,400.00 Rp 79,400.00
276 Keramik 30 x 30 (cm) terang m² Rp 84,700.00 Rp 84,700.00
277 Keramik 40 x 40 (cm) putih / berwarna m² Rp 95,300.00 Rp 95,300.00
278 Keramik KM/WC anti slip 20 x 20 (cm) m² Rp 77,700.00 Rp 77,700.00
279 Keramik 30x30 cm merk "Hercules" ( corak ) m2 Rp 60,725.70 Rp 60,725.70
280 Keramik 30x30 cm merk "Ikad" ( polos ) m2 Rp 67,155.48 Rp 67,155.48
281 Keramik 30x30 cm merk "Ikad" ( corak ) m2 Rp 72,514.26 Rp 72,514.26
282 Keramik 30x30 cm merk "KIA" ( polos ) m2 Rp 60,102.00 Rp 60,102.00
283 Keramik 30x30 cm merk "KIA" ( corak ) m2 Rp 55,010.34 Rp 55,010.34
284 Keramik 20x25 cm merk "Mulia" ( corak ) m2 Rp 68,040.00 Rp 68,040.00
285 Knee / elbow PVC 1(inch) buah Rp 6,200.00 Rp 6,200.00
286 Knee / elbow PVC 1/2 (inch) buah Rp 3,100.00 Rp 3,100.00
287 Knee / elbow PVC 3/4 (inch) buah Rp 3,700.00 Rp 3,700.00
288 Knee Gip dia 13 mm bh Rp 3,830.40 Rp 3,830.40
289 Knee PVC dia 3" bh Rp 9,169.02 Rp 9,169.02
290 Kompon gypsum lembar Rp 47,700.00 Rp 47,700.00
291 Koral beton m3 Rp 453,600.00 Rp 453,600.00
292 Kopling dia 13 mm bh Rp 7,560.00 Rp 7,560.00
293 Kran air dia 13 mm bh Rp 50,400.00 Rp 50,400.00
294 Kran air ø 0,75 (inch) buah Rp 39,700.00 Rp 39,700.00
295 Kran air ø 1,50 (inch) buah Rp 48,500.00 Rp 48,500.00
296 Kuas roll buah Rp 29,100.00 Rp 29,100.00
297 Kuas uk. 1" buah Rp 6,200.00 Rp 6,200.00
298 Kuas uk. 1,5" buah Rp 7,900.00 Rp 7,900.00
299 Kuas uk. 3" buah Rp 13,200.00 Rp 13,200.00
300 Kunci jendela (lokal) set Rp 26,500.00 Rp 26,500.00
301 Kunci lemari buah Rp 40,600.00 Rp 40,600.00
302 Kunci pintu (biasa) set Rp 150,000.00 Rp 150,000.00
303 Kunci pintu (istimewa) set Rp 295,000.00 Rp 295,000.00
304 Kunci pintu untuk meubelair (furniture) set Rp 40,600.00 Rp 40,600.00
305 Kunci silinder buah Rp 184,400.00 Rp 184,400.00
306 Kunci tanam buah Rp 132,400.00 Rp 132,400.00
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

307 Kunci tanam antik buah Rp 150,000.00 Rp 150,000.00


308 Kunci tanam kamar mandi buah Rp 63,500.00 Rp 63,500.00
309 Kunci gembok bh Rp 18,427.50 Rp 18,427.50
310 Kunci tanam besar merk "693LD" set Rp 69,195.00 Rp 69,195.00
311 Kunci tanam kecil merk "693LD" set Rp 53,550.00 Rp 53,550.00
312 Kunci tanam besar merk "ROYAL" set Rp 105,210.00 Rp 105,210.00
313 Kunci tanam kecil merk "ROYAL" set Rp 75,600.00 Rp 75,600.00
314 Kusen alumunium m' Rp 133,358.40 Rp 133,358.40
315 Rp -
316 Kusen pintu / jendela alumunium 3" m² Rp 612,100.00 Rp 612,100.00
317 Kusen pintu / jendela alumunium 4" m² Rp 759,700.00 Rp 759,700.00
318 Lampu downlight SL 25 Watt buah Rp 234,800.00 Rp 234,800.00
319 Lampu taman + tiang + merkuri buah Rp 234,800.00 Rp 234,800.00
320 Lampu taman bulat komplit buah Rp 264,500.00 Rp 264,500.00
321 Lampu TL 10 W + aksesoris buah Rp 79,394.92 Rp 79,394.92
322 Lampu TL 20 W + aksesoris buah Rp 113,300.00 Rp 113,300.00
323 Lampu TL 40 W + aksesoris buah Rp 87,800.00 Rp 87,800.00
324 Lampu TL 100 W + aksesoris buah Rp 139,000.00 Rp 139,000.00
Lampu Jari jari 9 watt buah Rp 45,000.00 Rp 45,000.00
Lampu Jari jari 14 watt buah Rp 47,000.00 Rp 47,000.00
Lampu Jari jari 18 watt buah Rp 61,000.00 Rp 61,000.00
Lampu Jari jari 25 watt buah Rp 64,000.00 Rp 64,000.00
Lampu Jari jari 5 watt buah Rp 23,000.00 Rp 23,000.00
Lampu Pijar 10 Watt buah Rp 87,000.00 Rp 87,000.00
Lampu Pijar 25 Watt buah Rp 41,000.00 Rp 41,000.00
Lampu Pijar 40 Watt buah Rp 21,900.00 Rp 21,900.00
Lampu Pijar 60 Watt buah Rp 96,000.00 Rp 96,000.00
Lampu Pijar 75 Watt buah Rp 79,781.00 Rp 79,781.00
Lampu Pijar 100 Watt buah Rp 160,000.00 Rp 160,000.00
Downligt buah Rp 213,000.00 Rp 213,000.00
325 Langit-langit Accoustic board / tile uk. 0,30 x 0,30 (m) m² Rp 68,800.00 Rp 68,800.00
326 Langit-langit Accoustic board / tile uk. 0,30 x 0,60 (m) m² Rp 70,600.00 Rp 70,600.00
327 Langit-langit Accoustic board / tile uk. 0,60 x 1,20 x 0,14 (m) m² Rp 86,500.00 Rp 86,500.00
328 Langit-langit Accoustic board / tile uk. 0,60 x 1,20 x 0,15 (m) m² Rp 98,800.00 Rp 98,800.00
329 Lis kayu profil uk. 3 x 3 cm m' Rp 23,310.00 Rp 23,310.00
330 Lis kayu biasa uk. 0,75 x 2 cm m' Rp 11,340.00 Rp 11,340.00
331 Lem (standar Aica Aibond) kg Rp 29,000.00 Rp 29,000.00
332 Lem (standar Fox) kg Rp 31,500.00 Rp 31,500.00
333 Lem PVC ultra kecil klg Rp 6,300.00 Rp 6,300.00
334 Mata lampu + instalasi titik Rp 52,300.00 Rp 52,300.00
335 Meter box (terpasang) titik Rp 389,400.00 Rp 389,400.00
336 Minyak bekisting liter Rp 9,700.00 Rp 9,700.00
337 Minyak pelarut cat (solvent) liter Rp 28,900.00 Rp 28,900.00
338 Minyak pelumas (oli) liter Rp 22,050.00 Rp 22,050.00
339 Minyak solar liter Rp 6,655.32 Rp 6,655.32
340 Minyak tanah (industri) liter Rp 11,500.00 Rp 11,500.00
341 Multiplek tebal 12 mm 4 x 8 (inch) lembar Rp 292,100.00 Rp 292,100.00
342 Multiplek tebal 15 mm 4 x 8 (inch) lembar Rp 361,100.00 Rp 361,100.00
343 Multiplek tebal 18 mm 4 x 8 (inch) lembar Rp 407,200.00 Rp 407,200.00
344 Multiplek tebal 6 mm uk. 1.22 x 2.44 (m) lembar Rp 142,100.00 Rp 142,100.00
345 Multiplek tebal 9 mm 4 x 8 (inch) lembar Rp 213,200.00 Rp 213,200.00
346 Melamin uk. ( 4' x 8' ) m2 Rp 996,320.00 Rp 996,320.00
347 Paku kg Rp 19,358.18 Rp 19,358.18
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

348 Paku anti Karat kg Rp 37,900.00 Rp 37,900.00


349 Paku asbes kg Rp 42,000.00 Rp 42,000.00
350 Paku ulir asbes kg Rp 40,000.00 Rp 40,000.00
351 Paku berbagai ukuran (1/2" - 1") kg Rp 37,500.00 Rp 37,500.00
352 Paku berbagai ukuran (2" - 5") kg Rp 45,000.00 Rp 45,000.00
353 Paku jembatan kg Rp 61,800.00 Rp 61,800.00
354 Paku kait bh Rp 1,700.00 Rp 1,700.00
355 Paku sekrup bh Rp 1,800.00 Rp 1,800.00
356 Paku seng kg Rp 45,000.00 Rp 45,000.00
357 Paku tembok kg Rp 26,500.00 Rp 26,500.00
358 Paku Gypsum kg Rp 39,585.00 Rp 39,585.00
359 Panel listrik / MCB, 1 group / fase buah Rp 101,700.00 Rp 101,700.00
360 Panel listrik / MCB, 2 group / fase buah Rp 130,200.00 Rp 130,200.00
361 Panel listrik / MCB, 3 group / fase buah Rp 133,700.00 Rp 133,700.00
362 Panel listrik / MCB, 4 group / fase buah Rp 180,200.00 Rp 180,200.00
363 Parquette lantai m² Rp 150,000.00 Rp 150,000.00
364 Pasir ayak untuk beton m³ Rp 450,000.00 Rp 450,000.00
365 Pasir pasang m³ Rp 450,000.00 Rp 450,000.00
366 Pasir urug / timbun m³ Rp 450,000.00 Rp 450,000.00
367 Pasir kasar m3 Rp 400,000.00 Rp 400,000.00
368 Pegangan pintu/door holder buah Rp 88,300.00 Rp 88,300.00
369 Pembersih / cleaner untuk keramik / porcelaint kg Rp 900.00 Rp 900.00
370 Pintu alumunium - swing + door closer unit Rp 2,356,300.00 Rp 2,356,300.00
371 Pintu alumunium - swing + floorhinge unit Rp 3,549,400.00 Rp 3,549,400.00
372 Pintu besi m² Rp 529,500.00 Rp 529,500.00
373 Pintu besi lipat m² Rp 882,500.00 Rp 882,500.00
374 Pipa besi hitam Medium dia "1 x 6 m m' Rp 23,059.89 Rp 23,059.89
375 Pipa besi hitam Medium dia "2 x 6 m m' Rp 28,005.18 Rp 28,005.18
376 Piap besi hitam Medium dia "3 x 6 m m' Rp 69,235.32 Rp 69,235.32
377 Pipa besi hitam S 11 dia 4" x 6 m m' Rp 69,235.32 Rp 69,235.32
378 Pipa Galvanis Medium B Dia 1/2" Staf Rp 175,000.00 Rp 175,000.00
379 Pipa Galvanis Medium B Dia 3/4" Staf Rp 210,000.00 Rp 210,000.00
380 Pipa Galvanis Medium B Dia 1" Staf Rp 310,000.00 Rp 310,000.00
381 Pipa Galvanis Medium B Dia 1 1/4" Staf Rp 460,378.00 Rp 460,378.00
382 Pipa Galvanis Medium B Dia 1 1/2" Staf Rp 480,000.00 Rp 480,000.00
383 Pipa Galvanis Medium B Dia 2" Staf Rp 652,000.00 Rp 652,000.00
384 Pipa Galvanis Medium B Dia 2 1/2" Staf Rp 850,000.00 Rp 850,000.00
385 Pipa Galvanis Medium B Dia 3" Rp 1,990,000.00 Rp 1,990,000.00
386 Pipa Galvanis Medium B Dia 1/2" Staf Rp 210,000.00 Rp 210,000.00
387 Pipa Galvanis Medium B Dia 3/4" Staf Rp 252,000.00 Rp 252,000.00
388 Pipa Galvanis Medium B Dia 1" Staf Rp 450,000.00 Rp 450,000.00
389 Pipa Galvanis Medium B Dia 1 1/4" Staf Rp 619,377.00 Rp 619,377.00
390 Pipa Galvanis Medium B Dia 1 1/2" Staf Rp 680,000.00 Rp 680,000.00
391 Pipa Galvanis Medium B Dia 2" Staf Rp 892,000.00 Rp 892,000.00
392 Pipa Galvanis Medium B Dia 2 1/2" Staf Rp 1,150,000.00 Rp 1,150,000.00
393 Pipa Galvanis Medium B Dia 3" Staf Rp 1,562,200.00 Rp 1,562,200.00
394 Pipa PVC 1/2" panjang 4 m Staf Rp 32,000.00 Rp 32,000.00
395 Pipa PVC 3/4" panjang 4 m Staf Rp 38,000.00 Rp 38,000.00
396 Pipa PVC 1" panjang 4 m Staf Rp 45,000.00 Rp 45,000.00
397 Pipa PVC 11/4" panjang 4 m Staf Rp 38,500.00 Rp 38,500.00
398 Pipa PVC 11/2" panjang 4 m Staf Rp 38,500.00 Rp 38,500.00
399 Pipa PVC 2" Staf Rp 74,000.00 Rp 74,000.00
400 Pipa PVC 2 1/2" Staf Rp 63,400.00 Rp 63,400.00
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

401 Pipa PVC 3" Staf Rp 69,600.00 Rp 69,600.00


402 Pipa PVC 4" Staf Rp 82,000.00 Rp 82,000.00
403 Pipa GIP 1/2" Staf Rp 38,000.00 Rp 38,000.00
404 Pipa GIP 3/4" Staf Rp 178,686.00 Rp 178,686.00
405 Pipa GIP 1" Staf Rp 60,000.00 Rp 60,000.00
406 Pipa GIP 2" Staf Rp 120,000.00 Rp 120,000.00
407 Pipa GIP 2 1/2" Staf Rp 167,483.00 Rp 167,483.00
408 Pipa GIP 3" Staf Rp 194,590.00 Rp 194,590.00
409 Pipa GIP 4" Staf Rp 251,554.00 Rp 251,554.00
410 Pipa GIP 1 1/2" Staf Rp 78,567.00 Rp 78,567.00
411 Plamuer kg Rp 19,400.00 Rp 19,400.00
412 Plint keramik 10 x 15 cm buah Rp 1,800.00 Rp 1,800.00
413 Plint keramik 10 x 20 cm buah Rp 2,600.00 Rp 2,600.00
414 Plint keramik 10 x 40 cm buah Rp 3,500.00 Rp 3,500.00
415 Plint ubin abu-abu 15 x 20 (cm) buah Rp 8,300.00 Rp 8,300.00
416 Plint ubin granito 10 x 30 cm buah Rp 8,800.00 Rp 8,800.00
417 Plint ubin granito 10 x 40 cm buah Rp 10,600.00 Rp 10,600.00
418 Plywood uk. 0,30 x 0,60 (m), tebal 4mm lembar Rp 73,200.00 Rp 73,200.00
419 Plywood uk. 0,30 x 0,60 (m), tebal 6mm lembar Rp 79,400.00 Rp 79,400.00
420 Plywood uk. 0,60 x 1,20 (m), tebal 4mm lembar Rp 77,700.00 Rp 77,700.00
421 Plywood uk. 0,60 x 1,20 (m), tebal 6mm lembar Rp 114,700.00 Rp 114,700.00
422 Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar Rp 121,800.00 Rp 121,800.00
423 Plywood uk. 1,22 x 2,44 (m), tebal 9 mm lembar Rp 130,600.00 Rp 130,600.00
424 Politur liter Rp 59,700.00 Rp 59,700.00
425 Politur jadi liter Rp 98,300.00 Rp 98,300.00
426 Porcelaint uk. 11 cm x 11 cm buah Rp 1,600.00 Rp 1,600.00
427 Profil aluminium T m' Rp 45,900.00 Rp 45,900.00
428 Pengadaan Water meter dia 13 mm unit Rp 441,000.00 Rp 441,000.00
429 Railing tangga stainless steel pipa dia. 2" dan 1" m' Rp 1,152,500.00 Rp 1,152,500.00
430 Rangka / frame accoustic board - cross tee m' Rp 45,900.00 Rp 45,900.00
431 Rangka / frame accoustic board - main tee m' Rp 55,600.00 Rp 55,600.00
432 Rangka / frame accoustic board - rod / adjustable dia. 4 mm m' Rp 26,500.00 Rp 26,500.00
433 Rangka / frame accoustic board - wall angle m' Rp 61,800.00 Rp 61,800.00
434 Rangka atap baja ringan type limas m² Rp 349,500.00 Rp 349,500.00
435 Rangka atap baja ringan type pelana m² Rp 325,600.00 Rp 325,600.00
436 Rapidrant kg Rp 3,400.00 Rp 3,400.00
437 Reducer PVC dari 1/2 (inch) ke 1 (inch) buah Rp 10,100.00 Rp 10,100.00
438 Reducer PVC dari 1/2 (inch) ke 3/4 (inch) buah Rp 14,000.00 Rp 14,000.00
439 Reducer PVC dari 3/4 (inch) ke 1 (inch) buah Rp 12,100.00 Rp 12,100.00
440 Reducer C1 dia 200 mm x80 mm unit Rp 821,737.79 Rp 821,737.79
441 Reducer PVC 150 x 100 unit Rp 1,330,085.01 Rp 1,330,085.01
442 Reducer Pvc 200 x 150 unit Rp 1,450,942.73 Rp 1,450,942.73
443 Rel pintu dorong buah Rp 220,600.00 Rp 220,600.00
444 Residu liter Rp 18,500.00 Rp 18,500.00
445 Rolling door m2 Rp 463,137.05 Rp 463,137.05
446 Rolling dor - alumunium tebal m² Rp 503,000.00 Rp 503,000.00
447 Rolling dor - alumunium tipis m² Rp 414,800.00 Rp 414,800.00
448 Rooflight fibreglass uk. 1,8 x 0,9 (m) lembar Rp 123,600.00 Rp 123,600.00
449 Rooster block uk. 12 x 11 x 24 (cm) buah Rp 10,200.00 Rp 10,200.00
450 Rooster block uk. 20 x 20 (cm) buah Rp 5,775.00 Rp 5,775.00
Sabun/deterjen kg Rp 14,500.00 Rp 14,500.00
Sekring1 phase buah Rp 22,000.00 Rp 22,000.00
451 Sekring 2 phase buah Rp 25,000.00 Rp 25,000.00
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

452 Saklar ganda buah Rp 21,000.00 Rp 21,000.00


453 Saklar Tunggal (Broco) buah Rp 42,500.00 Rp 42,500.00
Stop Kontak Tanam buah Rp 20,000.00 Rp 20,000.00
454 Sealent kg Rp 61,800.00 Rp 61,800.00
455 Semen PC @ 50 kg Zak Rp 86,000.00 Rp 86,000.00
456 Semen TONASA kg Rp 1,700.00 Rp 1,700.00
457 Semen BOSOWA kg Rp 2,200.00 Rp 2,200.00
458 Semen GRESIK kg Rp 1,460.00 Rp 1,460.00
459 Semen Tiga Roda kg Rp 1,432.80 Rp 1,432.80
460 Semen putih kg Rp 2,500.00 Rp 2,500.00
461 Tanah puru dari luar lokasi proyek m3 Rp 77,380.00 Rp 77,380.00
462 Tanah puru di lokasi proyek m3 Rp 68,620.00 Rp 68,620.00
463 Semen warna kg Rp 15,000.00 Rp 15,000.00
464 Seng plat BJLS 27 uk. 30" lembar Rp 53,900.00 Rp 53,900.00
465 Seng plat BJLS 27 uk. 20" lembar Rp 78,000.00 Rp 78,000.00
466 Seng gelombang Bjls 20" m2 Rp 76,500.00 Rp 76,500.00
467 Seng gelombang Bjls 25" m3 Rp 76,500.00 Rp 76,500.00
468 Seng gelombang Bjls 30" m4 Rp 76,500.00 Rp 76,500.00
469 Seng plat uk. 1,00 x 2,00 cm Bjls 30 Kp Rp 76,500.00 Rp 76,500.00
470 Sherra block buah Rp 76,500.00 Rp 76,500.00
471 Sirtu m³ Rp 76,500.00 Rp 76,500.00
472 Slot jendela buah Rp 76,500.00 Rp 76,500.00
473 Slot pintu buah Rp 76,500.00 Rp 76,500.00
474 Slot ventilasi / bouwvenlight buah Rp 76,500.00 Rp 76,500.00
475 Socket PVC ø 1 (inch) buah Rp 76,500.00 Rp 76,500.00
476 Socket PVC ø 1/2 (inch) buah Rp 76,500.00 Rp 76,500.00
477 Socket PVC ø 3/4 (inch) buah Rp 76,500.00 Rp 76,500.00
478 Soda api kg Rp 76,500.00 Rp 76,500.00
479 Softboard uk. 1,20 x 2,40 (m), tebal 4 mm lembar Rp 76,500.00 Rp 76,500.00
480 Stone Coating kg Rp 76,500.00 Rp 76,500.00
481 Stop kontak + instalasi titik Rp 76,500.00 Rp 76,500.00
482 Stop kran dia 13 mm bh Rp 76,500.00 Rp 76,500.00
483 Streorox - 100 kg Rp 76,500.00 Rp 76,500.00
484 Sunscreen alumunium m² Rp 76,500.00 Rp 76,500.00
485 Tanah Urug m3 Rp 76,500.00 Rp 76,500.00
486 Tanah Sirtu m 3
Rp 76,500.00 Rp 76,500.00
487 Tangki air / hydrant umum fiberglass 1.000 liter buah Rp 76,500.00 Rp 76,500.00
488 Tangki air / hydrant umum fiberglass 2.000 liter buah Rp 76,500.00 Rp 76,500.00
489 Tangki air / hydrant umum fiberglass 3.000 liter buah Rp 76,500.00 Rp 76,500.00
490 Tangki air / hydrant umum fiberglass 6.000 liter (horizontal) buah Rp 76,500.00 Rp 76,500.00
491 Tangki air / hydrant umum polyethylene 1.000 liter buah Rp 76,500.00 Rp 76,500.00
492 Tangki air / hydrant umum polyethylene 2.000 liter buah Rp 76,500.00 Rp 76,500.00
493 Tangki air / hydrant umum polyethylene 3.000 liter buah Rp 76,500.00 Rp 76,500.00
494 Tangki air / hydrant umum polyethylene 4.000 liter buah Rp 76,500.00 Rp 76,500.00
495 Tangki air / hydrant umum polyethylene 5.000 liter buah Rp 76,500.00 Rp 76,500.00
496 Tangki air / hydrant umum polyethylene 500 liter buah Rp 76,500.00 Rp 76,500.00
497 Tangki air fiberglass (oranye) 1.000 liter buah Rp 76,500.00 Rp 76,500.00
498 Tangki air fiberglass (oranye) 2.000 liter buah Rp 76,500.00 Rp 76,500.00
499 Tangki air fiberglass (oranye) 3.000 liter buah Rp 76,500.00 Rp 76,500.00
500 Tangki air fiberglass (oranye) 500 liter buah Rp 76,500.00 Rp 76,500.00
501 Teak wood 0,30 x 0,60 (m), tebal 4 mm lembar Rp 76,500.00 Rp 76,500.00
502 Teak wood 0,90 x 2,10 (m), tebal 4 mm lembar Rp 76,500.00 Rp 76,500.00
503 Teak wood 1,20 x 2,40 (m), tebal 4 mm lembar Rp 76,500.00 Rp 76,500.00
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

504 Teak wood 1,20 x 2,40 (m), tebal 4 mm m2 Rp 76,500.00 Rp 76,500.00


505 Tee C1 dia 200 x 200 mm ff unit Rp 76,500.00 Rp 76,500.00
506 Tee Gip dia 13 mm bh Rp 76,500.00 Rp 76,500.00
507 Tee all socket PVC ø 100 x 50 (mm) unit Rp 76,500.00 Rp 76,500.00
508 Tee PVC 150 x 100 mm unit Rp 76,500.00 Rp 76,500.00
509 Tee PVC 150 x 150 mm unit Rp 76,500.00 Rp 76,500.00
510 Tee PVC 150 x 40 mm unit Rp 76,500.00 Rp 76,500.00
511 Tee PVC 200 x 200 mm unit Rp 76,500.00 Rp 76,500.00
512 Tee all socket PVC ø 225 x 100 (mm) unit Rp 76,500.00 Rp 76,500.00
513 Tee all socket PVC ø 50 x 50 (mm) unit Rp 76,500.00 Rp 76,500.00
514 Tee all socket PVC ø 80 x 50 (mm) unit Rp 76,500.00 Rp 76,500.00
515 Tee Pvc 80 x 80 mm unit Rp 76,500.00 Rp 76,500.00
516 Tutup Manhole uk. 60 x 60 cm unit Rp 76,500.00 Rp 76,500.00
517 Tempat sabun keramik buah Rp 76,500.00 Rp 76,500.00
518 Ter kg Rp 76,500.00 Rp 76,500.00
519 Timbunan biasa m³ Rp 76,500.00 Rp 76,500.00
520 Timbunan pilihan / tanah puru m³ Rp 76,500.00 Rp 76,500.00
521 Triplek tebal 2 mm uk. 1.22 x 2.44 (m) lembar Rp 76,500.00 Rp 76,500.00
522 Triplek tebal 3 mm uk. 1.22 x 2.44 (m) lembar Rp 76,500.00 Rp 76,500.00
523 Triplek tebal 6 mm uk. 1.22 x 2.44 (m) m2 Rp 76,500.00 Rp 76,500.00
524 Triplek tebal 9 mm uk. 1.22 x 2.44 (m) m2 Rp 76,500.00 Rp 76,500.00
525 Triplek tebal 20 mm uk. 1.22 x 2.44 (m) m2 Rp 76,500.00 Rp 76,500.00
526 Triplek KM/WC 3 mm m2 Rp 76,500.00 Rp 76,500.00
527 Taekwood 3 mm 1.22 x 2.44 (m) Lembar Rp 76,500.00 Rp 76,500.00
528 Taekwood 3 mm 80 x 2.44 (m) m4 Rp 76,500.00 Rp 76,500.00
529 Ubin granito 30 x 30 cm m² Rp -
530 Ubin granito 40 x 40 cm m² Rp -
531 Ubin motif (mozaik) m² Rp 185,300.00 Rp 185,300.00
532 Ubin wafel buah Rp 5,100.00 Rp 5,100.00
533 Urinoir Lokal Putih Unit Rp 1,909,000.00 Rp 1,909,000.00
534 Urinoir Lokal warna unit Rp 1,909,000.00 Rp 1,909,000.00
535 Urinoir terasso m² Rp 67,500.00 Rp 67,500.00
536 Vertical blinds m² Rp 5,250.00 Rp 5,250.00
537 Wallpaper bermotif m² Rp 240,900.00 Rp 240,900.00
538 Wallpaper polos m² Rp 96,000.00 Rp 96,000.00
539 Wallcast dia 200 mm unit Rp 1,279,073.88 Rp 1,279,073.88
540 Wastapel keramik uk.besar bh Rp 661,500.00 Rp 661,500.00
541 Wastapel keramik uk.kecil bh Rp 437,850.00 Rp 437,850.00
542 Wastafel buah Rp 750,000.00 Rp 750,000.00
543 Water meter ø 1 (inch) + pipa GIP unit Rp 856,000.00 Rp 856,000.00
544 Water stop m' Rp 107,100.00 Rp 107,100.00
545 Zinc alum m2 Rp 69,300.00 Rp 69,300.00
Rp -
C. PERALATAN (BIAYA PEMILIKAN DAN OPERASI) Rp -
Rp -
1 Bulldozer jam Rp 420,000.00 Rp 420,000.00
2 Stone Crusher jam Rp 400,000.00 Rp 400,000.00
3 Motor grader jam Rp 334,000.00 Rp 334,000.00
4 Pemecah batu jam Rp 702,000.00 Rp 702,000.00
5 Mesin penyaring jam Rp 278,300.00 Rp 278,300.00
6 Wheel loader jam Rp 318,600.00 Rp 318,600.00
7 Wheel tractor jam Rp 124,200.00 Rp 124,200.00
8 Track Loader jam Rp 300,000.00 Rp 300,000.00
HARGA SATUAN HARGA SATUAN
No. URAIAN / NAMA / JENIS BARANG SATUAN KET.
(Rp) 2009 (Rp) 2009

1 2 3 4 5 6

9 Mesin gilas roda tiga 8 - 10 ton jam Rp 135,600.00 Rp 135,600.00


10 Mesin gilas tandem 6 - 10 ton jam Rp 210,900.00 Rp 210,900.00
11 Mesin gilas bergetar 10 ton jam Rp 254,900.00 Rp 254,900.00
12 Mesin gilas bergetar 8 - 15 ton jam Rp 277,200.00 Rp 277,200.00
13 Mesin gilas bergetar 1 ton jam Rp 61,000.00 Rp 61,000.00
14 Tamper / handy compactor jam Rp 10,600.00 Rp 10,600.00
15 Alat penggetar beton jam Rp 8,100.00 Rp 8,100.00
16 Mesin penyemprot aspal 1.000 liter jam Rp 98,900.00 Rp 98,900.00
17 Mesin penyemprot aspal 400 liter jam Rp 28,500.00 Rp 28,500.00
18 Mesin penyampur aspal 30 T / J + generator jam Rp 1,139,300.00 Rp 1,139,300.00
19 Mesin penghampar aspal jam Rp 165,100.00 Rp 165,100.00
20 Truk tangki air jam Rp 122,800.00 Rp 122,800.00
21 Trailer 1 Ton jam Rp 13,200.00 Rp 13,200.00
22 Concrete Vibratur jam Rp 101,000.00 Rp 101,000.00
23 Concrete Mixer jam Rp 101,400.00 Rp 101,400.00
24 Vibrator Roller jam Rp 139,200.00 Rp 139,200.00
25 Dump Truck 3-4 m3 jam Rp 113,200.00 Rp 113,200.00
26 Drump Truck jam Rp 181,400.00 Rp 181,400.00
27 Excavator jam Rp 313,000.00 Rp 313,000.00
28 Pulvi Mixer jam Rp 262,750.00 Rp 262,750.00
29 Generator set jam Rp 155,600.00 Rp 155,600.00
30 Water Pump 70-100 mm jam Rp 38,800.00 Rp 38,800.00
31 Tamper jam Rp 41,250.00 Rp 41,250.00
32 Jack Hammer jam Rp 100,000.00 Rp 100,000.00
33 Pedestrian Roller jam Rp 230,000.00 Rp 230,000.00
34 Crane 10-15 ton jam Rp 1,125,000.00 Rp 1,125,000.00
35 Dump truck 3,5 Ton jam Rp 173,200.00 Rp 173,200.00
36 Dump truck 5,0 Ton jam Rp 217,300.00 Rp 217,300.00
37 Truk bak terbuka 3,5 Ton jam Rp 156,700.00 Rp 156,700.00
38 Flat Bed Truck jam Rp 124,800.00 Rp 124,800.00
39 Tree Wheel Roller 6-8 ton jam Rp 249,000.00 Rp 249,000.00
40 Mesin pengaduk beton 125 liter jam Rp 11,900.00 Rp 11,900.00
41 Mesin pengaduk beton 250 liter jam Rp 39,500.00 Rp 39,500.00
42 Mesin pengaduk beton 500 liter jam Rp 79,100.00 Rp 79,100.00
43 Compressor 210 m3 / jam jam Rp 73,000.00 Rp 73,000.00
44 Pompa air 5 cm, 30 m3 / jam jam Rp 9,800.00 Rp 9,800.00
45 Peralatan traktor jam Rp 57,000.00 Rp 57,000.00
46 Asphalt Finisher jam Rp 340,600.00 Rp 340,600.00
47 asphalt Mixing Plant jam Rp 2,142,800.00 Rp 2,142,800.00
48 Tandem Roller jam Rp 191,800.00 Rp 191,800.00
49 Pneumanic Tire Roller jam Rp 200,000.00 Rp 200,000.00

C. LAIN-LAIN
1 a.Biaya Penyambungan Daya Listrik PLN
- 900 Watt Ls Rp 3,402,402.86 Rp 3,402,402.86
- 1300 Watt Ls Rp 39,925,924.60 Rp 39,925,924.60
- 2200 Watt Ls Rp 6,543,046.53 Rp 6,543,046.53
- 220000 Watt Ls Rp 65,430,465.30 Rp 65,430,465.30
b.Biaya Pemasangan Instalasi Listrik Titik Rp 196,260.22 Rp 196,260.22
2 Biaya Penyambungan Air bersih (PDAM) Ls Rp 1,701,079.74 Rp 1,701,079.74
3 Biaya Penyambungan Telepon Unit Rp 1,570,321.83 Rp 1,570,321.83
DAFTAR ANALISA BIAYA KONSTRUKSI
DINAS PEKERJAAN UMUM KOTA PANGKAPINANG TAHUN 2009

KODE HARGA SATUAN (Rp.)


URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

A.1 1 m' Pagar sementara dari kayu tinggi 2 m


1.2500 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 2,062,500.00
2.5000 kg Semen PC @ 50 kg 86,000.00 215,000.00
0.0050 m³ Pasir ayak untuk beton 450,000.00 2,250.00
0.0090 m³ Batu pecah 2 - 3 (cm) 455,520.00 4,099.68
0.0720 m³ Kayu gergajian kelas IV, balok kasau 5/7 1,919,318.71 138,190.95
0.0600 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,700.00
0.4000 ltr Residu 18,500.00 7,400.00
0.4000 Oh Pekerja tak terlatih 100,000.00 40,000.00
0.2000 Oh Tukang kayu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0200 Oh Mandor 90,000.00 1,800.00
2,495,640.63
A.2 1 m' Pagar sementara dari seng gelombang tinggi 2 m
1.2500 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 2,062,500.00
2.5000 kg Semen PC @ 50 kg 86,000.00 215,000.00
1.2000 lbr Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) 74,800.00 89,760.00
0.0050 m³ Pasir ayak untuk beton 450,000.00 2,250.00
0.0090 m³ Batu pecah 2 - 3 (cm) 455,520.00 4,099.68
0.0720 m³ Kayu gergajian kelas IV, balok kasau 5/7 1,919,318.71 138,190.95
0.0600 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,700.00
0.4500 ltr Cat menie 18,405.00 8,282.25
0.4000 Oh Pekerja tak terlatih 100,000.00 40,000.00
0.2000 Oh Tukang kayu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0200 Oh Mandor 90,000.00 1,800.00
2,586,282.88
A.3 1 m' Pagar sementara dari kawat berduri tinggi 1,8 m
1.0000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 1,650,000.00
2.0000 kg Semen PC @ 50 kg 86,000.00 172,000.00
25.0000 kg Kawat berduri 18,900.00 472,500.00
0.0050 m³ Pasir ayak untuk beton 450,000.00 2,250.00
0.0090 m³ Batu pecah 2 - 3 (cm) 455,520.00 4,099.68
0.0600 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,700.00
0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00
0.2000 Oh Tukang kayu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0200 Oh Mandor 90,000.00 1,800.00
2,357,049.68
A.4 1 m' Pengukuran dan pemasangan bouwplank, papan 2/20
0.0070 m³ Kayu gergajian kelas IV, papan 1,676,800.00 11,737.60
0.0120 m³ Kayu gergajian kelas IV, balok kasau 5/7 1,919,318.71 23,031.82
0.0200 kg Paku berbagai ukuran (2" - 5") 45,000.00 900.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0050 Oh Mandor 90,000.00 450.00
56,969.42
A.5 1 m² Pembuatan kantor sementara dengan lantai plesteran
1.2500 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 2,062,500.00
0.1800 m³ Kayu gergajian kelas IV, papan 1,676,800.00 301,824.00
0.8500 kg Paku berbagai ukuran (2" - 5") 45,000.00 38,250.00
1.1000 kg Besi strip 53,550.00 58,905.00
35.0000 kg Semen PC @ 50 kg 86,000.00 3,010,000.00
0.1500 m³ Pasir pasang 450,000.00 67,500.00
0.1000 m³ Pasir ayak untuk beton 450,000.00 45,000.00
0.1500 m³ Batu pecah 2 - 3 (cm) 455,520.00 68,328.00
30.0000 bh Batu bata merah (lokal) #N/A #N/A
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

0.2500 lbr Seng plat BJLS 27 uk. 0.9 x 1.83 (m) #N/A #N/A
2.0000 bh Jendela nako (kerangka + kaca 5 mm) 238,300.00 476,600.00
0.0800 m² Kaca bening tebal 3 mm 240,000.00 19,200.00
0.1500 bh Kunci tanam 132,400.00 19,860.00
0.0600 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 121,800.00 7,308.00
2.0000 Oh Pekerja tak terlatih 100,000.00 200,000.00
1.0000 Oh Tukang batu 100,000.00 100,000.00
2.0000 Oh Tukang kayu 100,000.00 200,000.00
0.3000 Oh Kepala tukang 85,000.00 25,500.00
0.0500 Oh Mandor 90,000.00 4,500.00
#N/A
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

A.6 1 m² Pembuatan gudang semen dan alat - alat


1.7000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 2,805,000.00
0.2100 m³ Kayu gergajian kelas IV, papan 1,676,800.00 352,128.00
0.3000 kg Paku berbagai ukuran (2" - 5") 45,000.00 13,500.00
10.5000 kg Semen PC @ 50 kg 86,000.00 903,000.00
0.0300 m³ Pasir ayak untuk beton 450,000.00 13,500.00
0.0500 m³ Batu pecah 2 - 3 (cm) 455,520.00 22,776.00
1.5000 lbr Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) 74,800.00 112,200.00
1.0000 Oh Pekerja tak terlatih 100,000.00 100,000.00
2.0000 Oh Tukang kayu 100,000.00 200,000.00
0.2000 Oh Kepala tukang 85,000.00 17,000.00
0.0500 Oh Mandor 90,000.00 4,500.00
4,543,604.00
A.7 1 m² Membersihkan lapangan dan peralatan
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.0050 Oh Mandor 90,000.00 450.00
10,450.00
A.8 1 m² Pembuatan bak adukan ukuran 40 cm x 50 cm x 20 cm
0.0360 m³ Kayu gergajian kelas IV, papan 1,676,800.00 60,364.80
0.0800 kg Paku berbagai ukuran (2" - 5") 45,000.00 3,600.00
0.0140 m³ Kayu gergajian kelas IV, balok kasau 5/7 1,919,318.71 26,870.46
0.3000 Oh Tukang kayu 100,000.00 30,000.00
0.0015 Oh Mandor 90,000.00 135.00
120,970.26
A.9 1 m² Pembuatan bedeng buruh
1.2500 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 2,062,500.00
0.1860 m³ Kayu gergajian kelas IV, papan 1,676,800.00 311,884.80
0.3000 kg Paku berbagai ukuran (2" - 5") 45,000.00 13,500.00
18.0000 kg Semen PC @ 50 kg 86,000.00 1,548,000.00
0.0300 m³ Pasir ayak untuk beton 450,000.00 13,500.00
0.0500 m³ Batu pecah 2 - 3 (cm) 455,520.00 22,776.00
1.5000 lbr Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) 74,800.00 112,200.00
1.3500 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 121,800.00 164,430.00
1.0000 Oh Pekerja tak terlatih 100,000.00 100,000.00
2.0000 Oh Tukang kayu 100,000.00 200,000.00
0.2000 Oh Kepala tukang 85,000.00 17,000.00
0.0500 Oh Mandor 90,000.00 4,500.00
4,570,290.80
A.10 1 m² Pembuatan stegger
1.2500 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 2,062,500.00
0.3000 kg Paku berbagai ukuran (2" - 5") 45,000.00 13,500.00
0.2500 Oh Pekerja tak terlatih 100,000.00 25,000.00
0.0170 Oh Tukang kayu 100,000.00 1,700.00
0.0020 Oh Kepala tukang 85,000.00 170.00
0.0130 Oh Mandor 90,000.00 1,170.00
2,104,040.00
A.11 1 m² Pembuatan jalan sementara (dengan tenaga)
0.1500 m³ Batu belah 10 - 15 (cm) 500,000.00 75,000.00
0.0900 m³ Batu kerikil Beton 1/2 429,000.00 38,610.00
0.0100 m³ Pasir urug / timbun 450,000.00 4,500.00
1.0000 Oh Pekerja tak terlatih 100,000.00 100,000.00
0.0500 Oh Mandor 90,000.00 4,500.00
222,610.00
A.12 1 m² Pembuatan jalan sementara, tebal 25 cm (dengan tenaga)
0.2750 m³ Batu belah 10 - 15 (cm) 500,000.00 137,500.00
0.0300 m³ Batu kerikil Beton 1/2 429,000.00 12,870.00
0.0500 m³ Pasir urug / timbun 450,000.00 22,500.00
1.0000 Oh Pekerja tak terlatih 100,000.00 100,000.00
0.1000 Oh Mandor 90,000.00 9,000.00
281,870.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
B. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP TANAH

B.1 1 m³ Galian Tanah biasa Sedalam 1 m (dengan tenaga)


0.4000 Oh Pekerja tak terlatih 100,000.00 40,000.00
0.0400 Oh Mandor 90,000.00 3,600.00
43,600.00
B.2 1 m³ Galian Tanah biasa Sedalam 2 m (dengan tenaga)
0.5260 Oh Pekerja tak terlatih 100,000.00 52,600.00
0.0520 Oh Mandor 90,000.00 4,680.00
57,280.00
B.3 1 m³ Galian Tanah biasa Sedalam 3 m (dengan tenaga)
0.7350 Oh Pekerja tak terlatih 100,000.00 73,500.00
0.0730 Oh Mandor 90,000.00 6,570.00
80,070.00
B.4 1 m³ Galian Tanah Keras Sedalam 1 m (dengan tenaga)
0.6250 Oh Pekerja tak terlatih 100,000.00 62,500.00
0.0620 Oh Mandor 90,000.00 5,580.00
68,080.00
B.5 1 m³ Galian Tanah Cadas Sedalam 1 m (dengan tenaga)
1.2500 Oh Pekerja tak terlatih 100,000.00 125,000.00
0.1250 Oh Mandor 90,000.00 11,250.00
136,250.00
B.6 1 m³ Galian Tanah Lumpur Sedalam 1 m (dengan tenaga)
0.8230 Oh Pekerja tak terlatih 100,000.00 82,300.00
0.0830 Oh Mandor 90,000.00 7,470.00
89,770.00
B.7 1 m³ Pekerjaan Stripping Setinggi 1 m (dengan tenaga)
0.0500 Oh Pekerja tak terlatih 100,000.00 5,000.00
0.0050 Oh Mandor 90,000.00 450.00
5,450.00
B.8 1 m³ Pembuangan Tanah Sejauh 150 m (dengan tenaga)
0.5160 Oh Pekerja tak terlatih 100,000.00 51,600.00
0.0500 Oh Mandor 90,000.00 4,500.00
56,100.00
B.9 1 m³ Urugan Kembali (dengan tenaga)
0.1920 Oh Pekerja tak terlatih 100,000.00 19,200.00
0.0190 Oh Mandor 90,000.00 1,710.00
20,910.00
B.10 1 m³ Pemadatan Tanah (dengan tenaga)
0.5000 Oh Pekerja tak terlatih 100,000.00 50,000.00
0.0500 Oh Mandor 90,000.00 4,500.00
54,500.00
B.11 1 m³ Urugan Pasir (dengan tenaga)
1.2000 m³ Pasir urug / timbun 450,000.00 540,000.00
0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00
0.0100 Oh Mandor 90,000.00 900.00
570,900.00
B.12 1 m³ Urugan Sirtu (dengan tenaga)
1.2000 m³ Sirtu 76,500.00 91,800.00
0.2500 Oh Pekerja tak terlatih 100,000.00 25,000.00
0.0250 Oh Mandor 90,000.00 2,250.00
119,050.00
B.13 1 m³ Urugan Tanah Puru (dengan tenaga)
1.2000 m³ Timbunan pilihan / tanah puru 76,500.00 91,800.00
0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00
0.0100 Oh Mandor 90,000.00 900.00
122,700.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
C. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

C.1 1 m³ Pasang Pondasi Batu Belah 1 PC : 2 Ps


1.1000 m³ Batu belah 10 - 15 (cm) 500,000.00 550,000.00
267.0000 kg Semen PC @ 50 kg 86,000.00 22,962,000.00
0.4270 m³ Pasir pasang 450,000.00 192,150.00
1.5000 Oh Pekerja tak terlatih 100,000.00 150,000.00
0.6000 Oh Tukang batu 100,000.00 60,000.00
0.0600 Oh Kepala tukang 85,000.00 5,100.00
0.0750 Oh Mandor 90,000.00 6,750.00
23,926,000.00
C.2 1 m³ Pasang Pondasi Batu Belah 1 PC : 4 Ps
1.1000 m³ Batu belah 15 - 20 (cm) 500,000.00 550,000.00
163.0000 kg Semen PC @ 50 kg 86,000.00 14,018,000.00
0.5200 m³ Pasir pasang 450,000.00 234,000.00
1.5000 Oh Pekerja tak terlatih 100,000.00 150,000.00
0.6000 Oh Tukang batu 100,000.00 60,000.00
0.0600 Oh Kepala tukang 85,000.00 5,100.00
0.0750 Oh Mandor 90,000.00 6,750.00
15,023,850.00
C.3 1 m³ Pasang Pondasi Batu Kali. 1 PC : 5 Ps
1.1000 m³ Batu belah 10 - 15 (cm) 500,000.00 550,000.00
136.0000 kg Semen PC @ 50 kg 86,000.00 11,696,000.00
0.5440 m³ Pasir pasang 450,000.00 244,800.00
1.5000 Oh Pekerja tak terlatih 100,000.00 150,000.00
0.6000 Oh Tukang batu 100,000.00 60,000.00
0.0600 Oh Kepala tukang 85,000.00 5,100.00
0.0750 Oh Mandor 90,000.00 6,750.00
12,712,650.00
C.4 1 m³ Pasang Pondasi Batu Kali. 1 PC : 6 Ps
1.1000 m³ Batu belah 10 - 15 (cm) 500,000.00 550,000.00
117.0000 kg Semen PC @ 50 kg 86,000.00 10,062,000.00
0.5610 m³ Pasir pasang 450,000.00 252,450.00
1.5000 Oh Pekerja tak terlatih 100,000.00 150,000.00
0.6000 Oh Tukang batu 100,000.00 60,000.00
0.0600 Oh Kepala tukang 85,000.00 5,100.00
0.0750 Oh Mandor 90,000.00 6,750.00
11,086,300.00
C.5 1 m³ Pasang pondasi batu kosong
1.2000 m³ Batu belah 15 - 20 (cm) 500,000.00 600,000.00
0.3000 m³ Pasir urug / timbun 450,000.00 135,000.00
0.7800 Oh Pekerja tak terlatih 100,000.00 78,000.00
0.3900 Oh Tukang batu 100,000.00 39,000.00
0.0390 Oh Kepala tukang 85,000.00 3,315.00
0.0390 Oh Mandor 90,000.00 3,510.00
858,825.00
C.6 1 m³ Pasang pondasi siklop, 40% batu pecah 2-3 cm
75.0000 kg Besi beton 27,000.00 2,025,000.00
202.0000 kg Semen PC @ 50 kg 86,000.00 17,372,000.00
0.3200 m³ Pasir ayak untuk beton 450,000.00 144,000.00
0.4900 m³ Batu pecah 2 - 3 (cm) 455,520.00 223,204.80
0.8000 kg Kawat beton 22,050.00 17,640.00
3.0000 Oh Pekerja tak terlatih 100,000.00 300,000.00
0.8500 Oh Tukang batu 100,000.00 85,000.00
0.0850 Oh Kepala tukang 85,000.00 7,225.00
0.1500 Oh Mandor 90,000.00 13,500.00
20,187,569.80
C.7 1 m³ Pasang pondasi bored pile ø 40 cm
280.0000 kg Semen PC @ 50 kg 86,000.00 24,080,000.00
0.4500 m³ Pasir ayak untuk beton 450,000.00 202,500.00
0.6700 m³ Batu pecah 2 - 3 (cm) 455,520.00 305,198.40
7.4720 Kg Cassing Plat Baja 44,100.00 329,515.20
2.3800 Oh Pekerja tak terlatih 100,000.00 238,000.00
0.3000 Oh Tukang batu 100,000.00 30,000.00
0.0300 Oh Kepala tukang 85,000.00 2,550.00
0.0800 Oh Mandor 90,000.00 7,200.00
25,194,963.60
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
C. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

C.8 1 m³ Pembuatan tiang pancang 40 cm x 40 cm beton bertulang


0.0190 m³ Pasir urug / timbun 450,000.00 8,550.00
0.0940 m³ Pasir ayak untuk beton 450,000.00 42,300.00
0.1500 m³ Batu pecah 1 - 2 (cm) 446,516.67 66,977.50
60.5000 kg Semen PC @ 50 kg 86,000.00 5,203,000.00
45.0000 kg Besi beton 27,000.00 1,215,000.00
0.9000 kg Kawat beton 22,050.00 19,845.00
0.0320 m³ Kayu gergajian kelas IV, balok kasau 5/7 1,919,318.71 61,418.20
0.1200 kg Paku berbagai ukuran (2" - 5") 45,000.00 5,400.00
0.0900 ltr Minyak bekisting 9,700.00 873.00
0.2400 kg Plamuer 19,400.00 4,656.00
1.0000 Oh Pekerja tak terlatih 100,000.00 100,000.00
0.6700 Oh Tukang batu 100,000.00 67,000.00
0.0670 Oh Kepala tukang 85,000.00 5,695.00
0.0500 Oh Mandor 90,000.00 4,500.00
6,805,214.70
C.9 1 m³ Pembuatan tiang pancang 35 cm x 35 cm beton bertulang
0.0160 m³ Pasir urug / timbun 450,000.00 7,200.00
0.0800 m³ Pasir ayak untuk beton 450,000.00 36,000.00
0.1250 m³ Batu pecah 1 - 2 (cm) 446,516.67 55,814.58
49.0000 kg Semen PC @ 50 kg 86,000.00 4,214,000.00
34.5000 kg Besi beton 27,000.00 931,500.00
0.7000 kg Kawat beton 22,050.00 15,435.00
0.0270 m³ Kayu gergajian kelas IV, balok kasau 5/7 1,919,318.71 51,821.61
0.1200 kg Paku berbagai ukuran (2" - 5") 45,000.00 5,400.00
0.0900 ltr Minyak bekisting 9,700.00 873.00
0.2000 kg Plamuer 19,400.00 3,880.00
0.8000 Oh Pekerja tak terlatih 100,000.00 80,000.00
0.5000 Oh Tukang batu 100,000.00 50,000.00
0.0500 Oh Kepala tukang 85,000.00 4,250.00
0.0400 Oh Mandor 90,000.00 3,600.00
5,459,774.19
C.10 1 m³ Pembuatan tiang pancang 30 cm x 30 cm beton bertulang
0.0118 m³ Pasir urug / timbun 450,000.00 5,289.80
0.0588 m³ Pasir ayak untuk beton 450,000.00 26,448.98
0.0918 m³ Batu pecah 1 - 2 (cm) 446,516.67 41,006.63
36.0000 kg Semen PC @ 50 kg 86,000.00 3,096,000.00
25.3469 kg Besi beton 27,000.00 684,367.35
0.5143 kg Kawat beton 22,050.00 11,340.00
0.0198 m³ Kayu gergajian kelas IV, balok kasau 5/7 1,919,318.71 38,073.02
0.0882 kg Paku berbagai ukuran (2" - 5") 45,000.00 3,967.35
0.0661 ltr Minyak bekisting 9,700.00 641.39
0.1469 kg Plamuer 19,400.00 2,850.61
0.5878 Oh Pekerja tak terlatih 100,000.00 58,775.51
0.3673 Oh Tukang batu 100,000.00 36,734.69
0.0367 Oh Kepala tukang 85,000.00 3,122.45
0.0294 Oh Mandor 90,000.00 2,644.90
4,011,262.67
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
D. ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING

D.1 1 m² Pasang Dinding Bataco Uk. 20 cm x 40 cm, 1 PC : 4 Ps


13.0000 bh Bataco 2,115.00 27,495.00
5.8333 kg Semen PC @ 50 kg 86,000.00 501,666.67
0.0133 m³ Pasir pasang 450,000.00 6,000.00
0.0833 Oh Pekerja tak terlatih 100,000.00 8,333.33
0.0833 Oh Tukang batu 100,000.00 8,333.33
0.0083 Oh Kepala tukang 85,000.00 708.33
0.0080 Oh Mandor 90,000.00 720.00
553,256.67
D.2 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 2 Ps
140.0000 bh Batu bata Kls I 3,300.00 462,000.00
43.5000 kg Semen PC @ 50 kg 86,000.00 3,741,000.00
0.0800 m³ Pasir pasang 450,000.00 36,000.00
0.6500 Oh Pekerja tak terlatih 100,000.00 65,000.00
0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0300 Oh Mandor 90,000.00 2,700.00
4,328,400.00
D.3 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 4 Ps
140.0000 bh Batu bata Kls I 3,300.00 462,000.00
26.5500 kg Semen PC @ 50 kg 86,000.00 2,283,300.00
0.0930 m³ Pasir pasang 450,000.00 41,850.00
0.6500 Oh Pekerja tak terlatih 100,000.00 65,000.00
0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0300 Oh Mandor 90,000.00 2,700.00
2,876,550.00
D.4 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 5 Ps
140.0000 bh Batu bata Kls I 3,300.00 462,000.00
22.2000 kg Semen PC @ 50 kg 86,000.00 1,909,200.00
0.1020 m³ Pasir pasang 450,000.00 45,900.00
0.6500 Oh Pekerja tak terlatih 100,000.00 65,000.00
0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0300 Oh Mandor 90,000.00 2,700.00
2,506,500.00
D.5 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 2 Ps
70.0000 bh Batu bata Kls I 3,300.00 231,000.00
18.9500 kg Semen PC @ 50 kg 86,000.00 1,629,700.00
0.0380 m³ Pasir pasang 450,000.00 17,100.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0150 Oh Mandor 90,000.00 1,350.00
1,922,000.00
D.6 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 4 Ps
70.0000 bh Batu bata Kls I 3,300.00 231,000.00
11.5000 kg Semen PC @ 50 kg 86,000.00 989,000.00
0.0430 m³ Pasir pasang 450,000.00 19,350.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0150 Oh Mandor 90,000.00 1,350.00
1,283,550.00
D.7 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 5 Ps
70.0000 bh Batu bata Kls I 3,300.00 231,000.00
9.6800 kg Semen PC @ 50 kg 86,000.00 832,480.00
0.0450 m³ Pasir pasang 450,000.00 20,250.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
D. ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING

0.0150 Oh Mandor 90,000.00 1,350.00


1,127,930.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
D. ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING

D.8 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 6 Ps


70.0000 kg Batu bata Kls I 3,300.00 231,000.00
8.3200 kg Semen PC @ 50 kg 86,000.00 715,520.00
0.0490 m³ Pasir pasang 450,000.00 22,050.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0150 Oh Mandor 90,000.00 1,350.00
1,012,770.00
D.9 1 m² Pasang dinding hollowblock (H.B. 20)
12.5000 bh Hollow block (H.B. 20) 75,000.00 937,500.00
13.5000 kg Semen PC @ 50 kg 86,000.00 1,161,000.00
0.0480 m³ Pasir pasang 450,000.00 21,600.00
1.9500 kg Besi beton 27,000.00 52,650.00
0.3500 Oh Pekerja tak terlatih 100,000.00 35,000.00
0.1500 Oh Tukang batu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0170 Oh Mandor 90,000.00 1,530.00
2,225,555.00
D.10 1 m² Pasang dinding hollowblock (H.B. 15)
12.5000 bh Hollow block (H.B. 15) 62,700.00 783,750.00
10.4500 kg Semen PC @ 50 kg 86,000.00 898,700.00
0.0380 m³ Pasir pasang 450,000.00 17,100.00
1.9500 kg Besi beton 27,000.00 52,650.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.1200 Oh Tukang batu 100,000.00 12,000.00
0.0120 Oh Kepala tukang 85,000.00 1,020.00
0.0150 Oh Mandor 90,000.00 1,350.00
1,798,570.00
D.11 1 m² Pasang dinding hollowblock (H.B. 10)
12.5000 bh Hollow block (H.B. 10) 57,400.00 717,500.00
7.5000 kg Semen PC @ 50 kg 86,000.00 645,000.00
0.0270 m³ Pasir pasang 450,000.00 12,150.00
1.9500 kg Besi beton 27,000.00 52,650.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0150 Oh Mandor 90,000.00 1,350.00
1,471,500.00
D.12 1 m² Pasang dinding conblock (C.B. 10)
12.5000 bh Conblock (C.B. 10) 69,700.00 871,250.00
7.2000 kg Semen PC @ 50 kg 86,000.00 619,200.00
0.0020 m³ Pasir ayak untuk beton 450,000.00 900.00
0.0210 m³ Pasir pasang 450,000.00 9,450.00
2.5400 kg Besi beton 27,000.00 68,580.00
0.0030 kg Paku berbagai ukuran (2" - 5") 45,000.00 135.00
0.0010 m³ Kayu gergajian kelas IV, papan 1,676,800.00 1,676.80
0.0150 kg Kawat beton 22,050.00 330.75
0.0030 m³ Batu pecah 2 - 3 (cm) 455,520.00 1,366.56
0.3400 Oh Pekerja tak terlatih 100,000.00 34,000.00
0.1070 Oh Tukang batu 100,000.00 10,700.00
0.0070 Oh Tukang besi / tukang las 100,000.00 700.00
0.0114 Oh Kepala tukang 85,000.00 969.00
0.0170 Oh Mandor 90,000.00 1,530.00
1,620,788.11
D.13 1 m² Pasang dinding conblock (C.B. 15)
12.5000 bh Conblock (C.B. 15) 57,400.00 717,500.00
10.4600 kg Semen PC @ 50 kg 86,000.00 899,560.00
0.0030 m³ Pasir ayak untuk beton 450,000.00 1,350.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
D. ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING

0.0320 m³ Pasir pasang 450,000.00 14,400.00


0.8700 kg Besi beton 27,000.00 23,490.00
0.0040 kg Paku berbagai ukuran (2" - 5") 45,000.00 180.00
0.0010 m³ Kayu gergajian kelas IV, papan 1,676,800.00 1,676.80
0.0200 kg Kawat beton 22,050.00 441.00
0.0040 m³ Batu pecah 2 - 3 (cm) 455,520.00 1,822.08
0.3400 Oh Pekerja tak terlatih 100,000.00 34,000.00
0.1300 Oh Tukang batu 100,000.00 13,000.00
0.0070 Oh Tukang besi / tukang las 100,000.00 700.00
0.0137 Oh Kepala tukang 85,000.00 1,164.50
0.0170 Oh Mandor 90,000.00 1,530.00
1,710,814.38
D.14 1 m² Pasang dinding lantai
2.5000 bh Bondbeam uk. 40 x 20 x 20 (cm) 64,400.00 161,000.00
5.1000 kg Semen PC @ 50 kg 86,000.00 438,600.00
0.0800 m³ Pasir ayak untuk beton 450,000.00 36,000.00
1.5000 kg Besi beton 27,000.00 40,500.00
0.1500 m³ Batu pecah 2 - 3 (cm) 455,520.00 68,328.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.0300 Oh Tukang batu 100,000.00 3,000.00
0.0300 Oh Tukang besi / tukang las 100,000.00 3,000.00
0.0060 Oh Kepala tukang 85,000.00 510.00
0.0050 Oh Mandor 90,000.00 450.00
761,388.00
D.15 1 m² Pasang dinding roster uk. 20 cm x 20 cm
25.0000 bh Rooster block uk. 20 x 20 (cm) 5,775.00 144,375.00
12.8000 kg Semen PC @ 50 kg 86,000.00 1,100,800.00
0.0350 m³ Pasir pasang 450,000.00 15,750.00
0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0150 Oh Mandor 90,000.00 1,350.00
1,303,125.00
D.16 1 m² Pasang dinding rooster / krawang uk. 12 cm x 11 cm x 24 cm
36.0000 bh Rooster block uk. 12 x 11 x 24 (cm) 10,200.00 367,200.00
12.8000 kg Semen PC @ 50 kg 86,000.00 1,100,800.00
0.0350 m³ Pasir pasang 450,000.00 15,750.00
0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0150 Oh Mandor 90,000.00 1,350.00
1,525,950.00
D.17 1 m² Pasang dinding bata berongga uk. 5 cm x 11 cm x 24 cm
80.0000 bh Batu bata berongga uk. 5 x 11 x 24 (cm) #N/A #N/A
23.6500 kg Semen PC @ 50 kg 86,000.00 2,033,900.00
0.5700 m³ Pasir pasang 450,000.00 256,500.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.1500 Oh Tukang batu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0150 Oh Mandor 90,000.00 1,350.00
#N/A
D.18 1 m² Pasang dinding anyaman bambu, rangka kayu
0.1500 lbr Bilik bambu kering, uk. 1,5 x 4 (m) 61,800.00 9,270.00
0.0140 m³ Kayu gergajian kelas II, balok kasau 5/7 2,500,000.00 35,000.00
0.0120 kg Paku berbagai ukuran (2" - 5") 45,000.00 540.00
0.0030 m³ Kayu gergajian kelas III, balok list 2/4 1,750,000.00 5,250.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.0500 Oh Tukang kayu 100,000.00 5,000.00
0.0050 Oh Kepala tukang 85,000.00 425.00
0.0020 Oh Mandor 90,000.00 180.00
65,665.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

E.1 1 m² Plesteran 1 PC : 2 Ps, tebal 15 mm


8.5200 kg Semen PC @ 50 kg 86,000.00 732,720.00
0.0170 m³ Pasir pasang 450,000.00 7,650.00
0.2000 Oh Pekerja tak terlatih 100,000.00 20,000.00
0.1500 Oh Tukang batu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0100 Oh Mandor 90,000.00 900.00
777,545.00
E.2 1 m² Plesteran 1 PC : 4 Ps, tebal 15 mm
5.2000 kg Semen PC @ 50 kg 86,000.00 447,200.00
0.0200 m³ Pasir pasang 450,000.00 9,000.00
0.2000 Oh Pekerja tak terlatih 100,000.00 20,000.00
0.1500 Oh Tukang batu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0100 Oh Mandor 90,000.00 900.00
493,375.00
E.3 1 m² Plesteran 1 PC : 5 Ps, tebal 15 mm
4.3200 kg Semen PC @ 50 kg 86,000.00 371,520.00
0.0220 m³ Pasir pasang 450,000.00 9,900.00
0.2000 Oh Pekerja tak terlatih 100,000.00 20,000.00
0.1500 Oh Tukang batu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0100 Oh Mandor 90,000.00 900.00
418,595.00
E.4 1 m² Plesteran 1 PC : 2 Ps, tebal 20 mm
14.2800 kg Semen PC @ 50 kg 86,000.00 1,228,080.00
0.0230 m³ Pasir pasang 450,000.00 10,350.00
0.2500 Oh Pekerja tak terlatih 100,000.00 25,000.00
0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0125 Oh Mandor 90,000.00 1,125.00
1,286,255.00
E.5 1 m² Plesteran 1 PC : 4 Ps, tebal 20 mm
8.6800 kg Semen PC @ 50 kg 86,000.00 746,480.00
0.0280 m³ Pasir pasang 450,000.00 12,600.00
0.2500 Oh Pekerja tak terlatih 100,000.00 25,000.00
0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0125 Oh Mandor 90,000.00 1,125.00
806,905.00
E.6 1 m² Plesteran 1 PC : 5 Ps, tebal 20 mm
7.2900 kg Semen PC @ 50 kg 86,000.00 626,940.00
0.0280 m³ Pasir pasang 450,000.00 12,600.00
0.2500 Oh Pekerja tak terlatih 100,000.00 25,000.00
0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0125 Oh Mandor 90,000.00 1,125.00
687,365.00
E.7 1 m² Plesteran 1 PC : 2 Ps, tebal 25 mm
15.5000 kg Semen PC @ 50 kg 86,000.00 1,333,000.00
0.0130 m³ Pasir pasang 450,000.00 5,850.00
0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00
0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0130 Oh Mandor 90,000.00 1,170.00
1,391,720.00
E.8 1 m² Plesteran 1 PC : 4 Ps, tebal 25 mm
9.4800 kg Semen PC @ 50 kg 86,000.00 815,280.00
0.0380 m³ Pasir pasang 450,000.00 17,100.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00


0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0130 Oh Mandor 90,000.00 1,170.00
885,250.00
E.9 1 m² Plesteran 1 PC : 5 Ps, tebal 25 mm
7.9400 kg Semen PC @ 50 kg 86,000.00 682,840.00
0.0390 m³ Pasir pasang 450,000.00 17,550.00
0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00
0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0130 Oh Mandor 90,000.00 1,170.00
753,260.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

E.10 1 m² Plesteran 1 PC : 2 Ps, tebal 30 mm


18.6500 kg Semen PC @ 50 kg 86,000.00 1,603,900.00
0.0350 m³ Pasir pasang 450,000.00 15,750.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.2500 Oh Tukang batu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0150 Oh Mandor 90,000.00 1,350.00
1,680,125.00
E.11 1 m² Plesteran 1 PC : 4 Ps, tebal 30 mm
11.3800 kg Semen PC @ 50 kg 86,000.00 978,680.00
0.0420 m³ Pasir pasang 450,000.00 18,900.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.2500 Oh Tukang batu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0150 Oh Mandor 90,000.00 1,350.00
1,058,055.00
E.12 1 m² Plesteran 1 PC : 5 Ps, tebal 30 mm
8.1900 kg Semen PC @ 50 kg 86,000.00 704,340.00
0.0450 m³ Pasir pasang 450,000.00 20,250.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.2500 Oh Tukang batu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0150 Oh Mandor 90,000.00 1,350.00
785,065.00
E.13 1 m² Plesteran beton 1 PC : 2 Ps, tebal 15 mm
9.3000 kg Semen PC @ 50 kg 86,000.00 799,800.00
0.0180 m³ Pasir pasang 450,000.00 8,100.00
0.2600 Oh Pekerja tak terlatih 100,000.00 26,000.00
0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0130 Oh Mandor 90,000.00 1,170.00
856,770.00
E.14 1 m² Plesteran beton 1 PC : 3 Ps, tebal 15 mm
7.0700 kg Semen PC @ 50 kg 86,000.00 608,020.00
0.0210 m³ Pasir pasang 450,000.00 9,450.00
0.2600 Oh Pekerja tak terlatih 100,000.00 26,000.00
0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0130 Oh Mandor 90,000.00 1,170.00
666,340.00
E.15 1 m² Plesteran ciprat 1Pc : 2 Ps
4.3200 kg Semen PC @ 50 kg 86,000.00 371,520.00
0.0160 m³ Pasir pasang 450,000.00 7,200.00
0.2500 Oh Pekerja tak terlatih 100,000.00 25,000.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0150 Oh Mandor 90,000.00 1,350.00
415,920.00
E.16 1 m² Plesteran siar, 1 PC : 2 Ps
4.3200 kg Semen PC @ 50 kg 86,000.00 371,520.00
0.0160 m³ Pasir pasang 450,000.00 7,200.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.0700 Oh Tukang batu 100,000.00 7,000.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0080 Oh Mandor 90,000.00 720.00
402,035.00
E.17 1 m² Plesteran waterproof batacote, 3 lapis
0.5000 kg Semen PC @ 50 kg 86,000.00 43,000.00
2.9000 m² Batacote 61,800.00 179,220.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

0.0060 m³ Pasir pasang 450,000.00 2,700.00


0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00
0.2000 Oh Tukang batu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0150 Oh Mandor 90,000.00 1,350.00
277,970.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

F.1 1 m³ Pasang kusen pintu / jendela, kayu kelas II


1.1000 m³ Kayu gergajian kelas II, balok 2,500,000.00 2,750,000.00
6.0000 Oh Pekerja tak terlatih 100,000.00 600,000.00
20.0000 Oh Tukang kayu 100,000.00 2,000,000.00
2.0000 Oh Kepala tukang 85,000.00 170,000.00
0.3000 Oh Mandor 90,000.00 27,000.00
5,547,000.00
F.2 1 m³ Pasang balok profil, kayu kelas III (non SNI)
1.1000 m³ Kayu gergajian kelas III, balok 1,750,000.00 1,925,000.00
0.0300 kg Paku berbagai ukuran (2" - 5") 45,000.00 1,350.00
0.0250 Oh Pekerja tak terlatih 100,000.00 2,500.00
0.6250 Oh Tukang kayu 100,000.00 62,500.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0400 Oh Mandor 90,000.00 3,600.00
1,997,075.00
F.3 1 m² Pasang daun pintu / jendela panel, kayu kelas II
0.0400 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 100,000.00
1.0000 Oh Pekerja tak terlatih 100,000.00 100,000.00
2.5000 Oh Tukang kayu 100,000.00 250,000.00
0.2500 Oh Kepala tukang 85,000.00 21,250.00
0.0500 Oh Mandor 90,000.00 4,500.00
475,750.00
F.4 1 m² Pasang daun pintu / jendela kaca bening tebal 3 mm, kayu kelas II
0.0350 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 87,500.00
1.0000 m² Kaca bening tebal 3 mm 240,000.00 240,000.00
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.8000 Oh Pekerja tak terlatih 100,000.00 80,000.00
2.0000 Oh Tukang kayu 100,000.00 200,000.00
0.2000 Oh Kepala tukang 85,000.00 17,000.00
0.0400 Oh Mandor 90,000.00 3,600.00
629,225.00
F.5 1 m² Pasang daun pintu / jendela kaca bening tebal 5 mm, kayu kelas II
0.0350 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 87,500.00
1.0000 m² Kaca bening tebal 5 mm 272,000.00 272,000.00
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.8000 Oh Pekerja tak terlatih 100,000.00 80,000.00
2.0000 Oh Tukang kayu 100,000.00 200,000.00
0.2000 Oh Kepala tukang 85,000.00 17,000.00
0.0400 Oh Mandor 90,000.00 3,600.00
661,225.00
F.5a 1 m² Pasang daun pintu / jendela kaca ryben tebal 5 mm, kayu kelas II
0.0350 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 87,500.00
1.0000 m² Kaca ryben tebal 5mm 5,800.00 5,800.00
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.8000 Oh Pekerja tak terlatih 100,000.00 80,000.00
2.0000 Oh Tukang kayu 100,000.00 200,000.00
0.2000 Oh Kepala tukang 85,000.00 17,000.00
0.0400 Oh Mandor 90,000.00 3,600.00
395,025.00
F.6 1m² Pasang Daun pintu/ jendela dg Jalusi, Kayu kelas II
0.0640 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 160,000.00
1.0000 Oh Pekerja tak terlatih 100,000.00 100,000.00
3.0000 Oh Tukang kayu 100,000.00 300,000.00
0.3000 Oh Kepala tukang 85,000.00 25,500.00
0.3000 Oh Mandor 90,000.00 27,000.00
612,500.00
F.7 1 m² Pasang daun pintu plywood rangkap, rangka kayu kelas II
0.0196 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 49,000.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.3000 Lt Lem (standar Aica Aibond) 29,000.00 8,700.00
1.0000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 121,800.00 121,800.00
0.6000 Oh Pekerja tak terlatih 100,000.00 60,000.00
2.0000 Oh Tukang kayu 100,000.00 200,000.00
0.2000 Oh Kepala tukang 85,000.00 17,000.00
0.0300 Oh Mandor 90,000.00 2,700.00
460,325.00
F.8 1 m² Pasang daun pintu teakwood rangkap, rangka kayu kelas II
0.0196 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 49,000.00
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.3000 Lt Lem (standar Aica Aibond) 29,000.00 8,700.00
1.0000 lbr Teak wood 1,20 x 2,40 (m), tebal 4 mm 76,500.00 76,500.00
0.6000 Oh Pekerja tak terlatih 100,000.00 60,000.00
2.0000 Oh Tukang kayu 100,000.00 200,000.00
0.2000 Oh Kepala tukang 85,000.00 17,000.00
0.0300 Oh Mandor 90,000.00 2,700.00
415,025.00
F.9 1 m² Pasang daun pintu plywood dan formika, rangka kayu kelas II
0.0196 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 49,000.00
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.8000 Lt Lem (standar Aica Aibond) 29,000.00 23,200.00
1.0000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 121,800.00 121,800.00
0.5000 lbr Formica 4" x 8" 79,400.00 39,700.00
0.8000 Oh Pekerja tak terlatih 100,000.00 80,000.00
2.5000 Oh Tukang kayu 100,000.00 250,000.00
0.2500 Oh Kepala tukang 85,000.00 21,250.00
0.0400 Oh Mandor 90,000.00 3,600.00
589,675.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
F.10 1 m² Pasang daun pintu teakwood dan formika, rangka kayu kelas II
0.0196 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 49,000.00
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.8000 Lt Lem (standar Aica Aibond) 29,000.00 23,200.00
0.5000 lbr Teak wood 1,20 x 2,40 (m), tebal 4 mm 76,500.00 38,250.00
0.5000 lbr Formica 4" x 8" 79,400.00 39,700.00
0.8000 Oh Pekerja tak terlatih 100,000.00 80,000.00
2.5000 Oh Tukang kayu 100,000.00 250,000.00
0.2500 Oh Kepala tukang 85,000.00 21,250.00
0.0400 Oh Mandor 90,000.00 3,600.00
506,125.00
F.11 1 m² Pasang daun pintu formika double, rangka kayu kelas II
0.0196 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 49,000.00
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
1.2000 Lt Lem (standar Aica Aibond) 29,000.00 34,800.00
1.0000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 121,800.00 121,800.00
1.0000 lbr Formica 4" x 8" 79,400.00 79,400.00
1.0000 Oh Pekerja tak terlatih 100,000.00 100,000.00
2.6000 Oh Tukang kayu 100,000.00 260,000.00
0.2600 Oh Kepala tukang 85,000.00 22,100.00
0.0500 Oh Mandor 90,000.00 4,500.00
672,725.00
F.12 1 m² Pasang jalusi mati, kayu kelas II
0.0600 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 150,000.00
0.1500 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 5,625.00
0.5000 Oh Pekerja tak terlatih 100,000.00 50,000.00
2.0000 Oh Tukang kayu 100,000.00 200,000.00
0.2000 Oh Kepala tukang 85,000.00 17,000.00
0.0250 Oh Mandor 90,000.00 2,250.00
424,875.00
F.13 1 m³ Pasang konstruksi kuda-kuda, kayu kelas II
1.1000 m³ Kayu gergajian kelas II, balok 2,500,000.00 2,750,000.00
15.0000 kg Besi strip 53,550.00 803,250.00
0.8000 kg Paku berbagai ukuran (2" - 5") 45,000.00 36,000.00
4.0000 Oh Pekerja tak terlatih 100,000.00 400,000.00
12.0000 Oh Tukang kayu 100,000.00 1,200,000.00
1.2000 Oh Kepala tukang 85,000.00 102,000.00
0.2000 Oh Mandor 90,000.00 18,000.00
5,309,250.00
F.14 1 m³ Pasang gording kuda-kuda, kayu kelas II (non SNI)
1.1000 m³ Kayu gergajian kelas II, balok 2,500,000.00 2,750,000.00
0.8000 kg Paku berbagai ukuran (2" - 5") 45,000.00 36,000.00
2.0000 Oh Pekerja tak terlatih 100,000.00 200,000.00
6.0000 Oh Tukang kayu 100,000.00 600,000.00
0.6000 Oh Kepala tukang 85,000.00 51,000.00
0.1000 Oh Mandor 90,000.00 9,000.00
3,646,000.00
F.15 1 m² Pasang kaso + reng untuk genteng, kayu kelas II
0.0165 m³ Kayu gergajian kelas II, balok 2,500,000.00 41,250.00
0.2000 kg Paku berbagai ukuran (2" - 5") 45,000.00 9,000.00
0.1200 Oh Pekerja tak terlatih 100,000.00 12,000.00
0.1200 Oh Tukang kayu 100,000.00 12,000.00
0.0120 Oh Kepala tukang 85,000.00 1,020.00
0.0060 Oh Mandor 90,000.00 540.00
75,810.00
F.16 1 m² Pasang rangka langit-langit uk. 1 m x 1 m, kayu kelas II
0.0120 m³ Kayu gergajian kelas II, balok 2,500,000.00 30,000.00
0.1000 kg Paku berbagai ukuran (2" - 5") 45,000.00 4,500.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
0.2500 Oh Tukang kayu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0750 Oh Mandor 90,000.00 6,750.00
83,375.00

F.17 1 m² Pasang rangka langit-langit uk. 30 cm x 60 cm, kayu kelas II


0.0230 m³ Kayu gergajian kelas II, balok 2,500,000.00 57,500.00
0.1500 kg Paku berbagai ukuran (2" - 5") 45,000.00 6,750.00
0.2000 Oh Pekerja tak terlatih 100,000.00 20,000.00
0.3000 Oh Tukang kayu 100,000.00 30,000.00
0.0300 Oh Kepala tukang 85,000.00 2,550.00
0.0100 Oh Mandor 90,000.00 900.00
117,700.00
F.18 1 m² Pasang rangka langit-langit uk. 30 cm x 30 cm, kayu kelas II
0.0270 m³ Kayu gergajian kelas II, balok 2,500,000.00 67,500.00
0.2000 kg Paku berbagai ukuran (2" - 5") 45,000.00 9,000.00
0.2500 Oh Pekerja tak terlatih 100,000.00 25,000.00
0.3500 Oh Tukang kayu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
0.0125 Oh Mandor 90,000.00 1,125.00
140,600.00
F.19 1 m² Pasang lisplank uk. 3 cm x 20 cm, kayu kelas II
0.0072 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 18,000.00
0.0500 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,250.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.2000 Oh Tukang kayu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0050 Oh Mandor 90,000.00 450.00
52,400.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
F.20 1 m² Pasang lisplank uk. 3 cm x 30 cm, kayu kelas II
0.0110 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 27,500.00
0.0500 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,250.00
0.1100 Oh Pekerja tak terlatih 100,000.00 11,000.00
0.2200 Oh Tukang kayu 100,000.00 22,000.00
0.0220 Oh Kepala tukang 85,000.00 1,870.00
0.0050 Oh Mandor 90,000.00 450.00
65,070.00
F.21 1 m² Pasang lisplank 2 x (3 cm x 20 cm), kayu kelas II
0.0145 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 36,250.00
0.0600 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,700.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.2500 Oh Tukang kayu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0750 Oh Mandor 90,000.00 6,750.00
87,825.00
F.22 1 m² Pasang lisplank 2 x (2 cm x 20 cm), kayu kelas II
0.0086 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 21,500.00
0.0600 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,700.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0500 Oh Mandor 90,000.00 4,500.00
49,550.00
F.23 1 m² Pasang rangka dinding pemisah papan, kayu kelas II
0.0195 m³ Kayu gergajian kelas II, balok 2,500,000.00 48,750.00
0.0070 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 17,500.00
0.1000 kg Paku berbagai ukuran (2" - 5") 45,000.00 4,500.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.4500 Oh Tukang kayu 100,000.00 45,000.00
0.0450 Oh Kepala tukang 85,000.00 3,825.00
0.0750 Oh Mandor 90,000.00 6,750.00
141,325.00
F.24 1 m³ Pasang rangka dinding pemisah triplek rangkap rangka kayu kelas III
0.0195 m³ Kayu gergajian kelas II, balok 2,500,000.00 48,750.00
0.0070 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 17,500.00
0.1000 kg Paku berbagai ukuran (2" - 5") 45,000.00 4,500.00
0.5600 ltr Lem (standar Aica Aibond) 29,000.00 16,240.00
1.0000 lbr Triplek tebal 2 mm uk. 1.22 x 2.44 (m) 76,500.00 76,500.00
0.2000 Oh Pekerja tak terlatih 100,000.00 20,000.00
0.6000 Oh Tukang kayu 100,000.00 60,000.00
0.0600 Oh Kepala tukang 85,000.00 5,100.00
0.0100 Oh Mandor 90,000.00 900.00
249,490.00
F.25 1 m² Pasang rangka dinding pemisah teakwood rangkap, kayu kelas II
0.0195 m³ Kayu gergajian kelas II, balok 2,500,000.00 48,750.00
0.0070 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 17,500.00
0.1000 kg Paku berbagai ukuran (2" - 5") 45,000.00 4,500.00
0.5600 ltr Lem (standar Aica Aibond) 29,000.00 16,240.00
1.0000 lbr Teak wood 1,20 x 2,40 (m), tebal 4 mm 76,500.00 76,500.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.4500 Oh Tukang kayu 100,000.00 45,000.00
0.0450 Oh Kepala tukang 85,000.00 3,825.00
0.0750 Oh Mandor 90,000.00 6,750.00
234,065.00
F.26 1 m² Pasang rangka dinding pemisah plywood rangkap, kayu kelas II
0.0195 m³ Kayu gergajian kelas II, balok 2,500,000.00 48,750.00
0.0070 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 17,500.00
0.1000 kg Paku berbagai ukuran (2" - 5") 45,000.00 4,500.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
0.5600 ltr Lem (standar Aica Aibond) 29,000.00 16,240.00
1.0000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 121,800.00 121,800.00
0.2000 Oh Pekerja tak terlatih 100,000.00 20,000.00
0.6000 Oh Tukang kayu 100,000.00 60,000.00
0.0600 Oh Kepala tukang 85,000.00 5,100.00
0.0100 Oh Mandor 90,000.00 900.00
294,790.00
F.27 1 m² Pasang dinding plywood,
0.4000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 121,800.00 48,720.00
0.0500 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,875.00
0.0250 Oh Pekerja tak terlatih 100,000.00 2,500.00
0.0750 Oh Tukang kayu 100,000.00 7,500.00
0.0075 Oh Kepala tukang 85,000.00 637.50
0.0013 Oh Mandor 90,000.00 117.00
61,349.50
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
F.28 1 m' Pasang list plafond, dengan kayu profil 3 cm x 3 cm, kayu kelas II
1.0500 m' Kayu gergajian kelas III, papan 1,750,000.00 1,837,500.00
0.0500 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,250.00
0.0210 Oh Pekerja tak terlatih 100,000.00 2,100.00
0.0210 Oh Tukang kayu 100,000.00 2,100.00
0.0020 Oh Kepala tukang 85,000.00 170.00
0.0010 Oh Mandor 90,000.00 90.00
1,844,210.00
F.29 1 m² Pasang papan nama proyek, kayu kelas III
0.0195 m³ Kayu gergajian kelas III, balok 1,750,000.00 34,125.00
0.0070 m³ Kayu gergajian kelas III, papan 1,750,000.00 12,250.00
0.1000 kg Paku berbagai ukuran (2" - 5") 45,000.00 4,500.00
2.0000 kg Cat minyak 59,062.50 118,125.00
0.2500 Oh Pekerja tak terlatih 100,000.00 25,000.00
0.7500 Oh Tukang kayu 100,000.00 75,000.00
0.7500 Oh Tukang cat 60,000.00 45,000.00
0.0750 Oh Kepala tukang 85,000.00 6,375.00
0.0075 Oh Mandor 90,000.00 675.00
321,050.00
F.30 1 m³ Pasang balok gelegar kayu, kayu kelas II
1.1000 m³ Kayu gergajian kelas II, balok 2,500,000.00 2,750,000.00
0.0500 Oh Pekerja tak terlatih 100,000.00 5,000.00
0.0500 Oh Tukang kayu 100,000.00 5,000.00
0.0050 Oh Kepala tukang 85,000.00 425.00
0.0025 Oh Mandor 90,000.00 225.00
2,760,650.00
F.31 1 m³ Pasang balok sandaran jembatan kayu / balok pemikul, kayu kelas II
1.1000 m³ Kayu gergajian kelas II, balok 2,500,000.00 2,750,000.00
0.0800 Oh Pekerja tak terlatih 100,000.00 8,000.00
0.2400 Oh Tukang kayu 100,000.00 24,000.00
0.0240 Oh Kepala tukang 85,000.00 2,040.00
0.0040 Oh Mandor 90,000.00 360.00
2,784,400.00
F.32 1 m² Pasang lantai jembatan dengan papan t = 8 cm, kayu kelas II
0.0800 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 200,000.00
0.4000 kg Paku jembatan 61,800.00 24,720.00
0.0020 Oh Pekerja tak terlatih 100,000.00 200.00
0.0050 Oh Tukang kayu 100,000.00 500.00
0.0005 Oh Kepala tukang 85,000.00 42.50
0.0001 Oh Mandor 90,000.00 9.00
225,471.50
F.33 1 m² Pasang lantai jembatan dengan papan t = 8 cm di atas gelegar besi, kayu kelas II
0.0800 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 200,000.00
8.0000 bh Baut klem 7,900.00 63,200.00
0.0025 Oh Pekerja tak terlatih 100,000.00 250.00
0.0075 Oh Tukang kayu 100,000.00 750.00
0.0008 Oh Kepala tukang 85,000.00 63.75
0.0001 Oh Mandor 90,000.00 11.25
264,275.00

F.34 1 m² Pasang lantai jembatan dengan papan t = 5 cm, kayu kelas II


0.0500 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 125,000.00
0.4000 kg Paku jembatan 61,800.00 24,720.00
0.0020 Oh Pekerja tak terlatih 100,000.00 200.00
0.0050 Oh Tukang kayu 100,000.00 500.00
0.0005 Oh Kepala tukang 85,000.00 42.50
0.0001 Oh Mandor 90,000.00 9.00
150,471.50
F.35 1 m² Pasang lantai jembatan dengan papan t = 5 cm di atas gelegar besi, kayu kelas II
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
0.0500 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 125,000.00
8.0000 bh Bubungan atap (nok) asbes sepasang 61,800.00 494,400.00
0.0025 Oh Pekerja tak terlatih 100,000.00 250.00
0.0075 Oh Tukang kayu 100,000.00 750.00
0.0008 Oh Kepala tukang 85,000.00 63.75
0.0001 Oh Mandor 90,000.00 11.25
620,475.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

G.1 1 m² Membuat lantai kerja beton tumbuk, 1 PC : 3 Ps : 5 krk, tebal 5 cm (n0n SNI)
10.0000 kg Semen PC @ 50 kg 86,000.00 860,000.00
0.0260 m³ Pasir ayak untuk beton 450,000.00 11,700.00
0.0440 m³ Batu pecah 2 - 3 (cm) 455,520.00 20,042.88
1.1500 Oh Pekerja tak terlatih 100,000.00 115,000.00
0.0200 Oh Tukang batu 100,000.00 2,000.00
0.0020 Oh Kepala tukang 85,000.00 170.00
0.0060 Oh Mandor 90,000.00 540.00
1,009,452.88
G.2 1 m³ Membuat beton tumbuk, 1 PC : 2 Ps : 3 krk
232.0000 kg Semen PC @ 50 kg 86,000.00 19,952,000.00
0.5200 m³ Pasir ayak untuk beton 450,000.00 234,000.00
0.7800 m³ Batu pecah 2 - 3 (cm) 455,520.00 355,305.60
1.6500 Oh Pekerja tak terlatih 100,000.00 165,000.00
0.2500 Oh Tukang batu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0800 Oh Mandor 90,000.00 7,200.00
20,740,630.60
G.3 1 m³ Membuat beton tumbuk, 1 PC : 3 Ps : 5 krk
218.0000 kg Semen PC @ 50 kg 86,000.00 18,748,000.00
0.5200 m³ Pasir ayak untuk beton 450,000.00 234,000.00
0.8700 m³ Batu pecah 2 - 3 (cm) 455,520.00 396,302.40
1.6500 Oh Pekerja tak terlatih 100,000.00 165,000.00
0.2500 Oh Tukang batu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0800 Oh Mandor 90,000.00 7,200.00
19,577,627.40
G.4 1 m³ Membuat beton tumbuk, 1 PC : 3 Ps : 6 krk
197.0000 kg Semen PC @ 50 kg 86,000.00 16,942,000.00
0.4700 m³ Pasir ayak untuk beton 450,000.00 211,500.00
0.9400 m³ Batu pecah 2 - 3 (cm) 455,520.00 428,188.80
1.6500 Oh Pekerja tak terlatih 100,000.00 165,000.00
0.2500 Oh Tukang batu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0800 Oh Mandor 90,000.00 7,200.00
17,781,013.80
G.5 1 m³ Membuat beton bertulang, 1 PC : 1,5 Ps : 3 krk
357.0000 kg Semen PC @ 50 kg 86,000.00 30,702,000.00
0.4200 m³ Pasir ayak untuk beton 450,000.00 189,000.00
0.5400 m³ Batu pecah 2 - 3 (cm) 455,520.00 245,980.80
1.6500 Oh Pekerja tak terlatih 100,000.00 165,000.00
0.2500 Oh Tukang batu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0800 Oh Mandor 90,000.00 7,200.00
31,336,305.80
G.6 1 m³ Membuat profil ad. 1 PC : 1,5 Ps (non SNI)
782.0000 kg Semen PC @ 50 kg 86,000.00 67,252,000.00
0.9200 m³ Pasir ayak untuk beton 450,000.00 414,000.00
2.0000 Oh Pekerja tak terlatih 100,000.00 200,000.00
4.2000 Oh Tukang batu 100,000.00 420,000.00
0.3000 Oh Kepala tukang 85,000.00 25,500.00
1.0000 Oh Mandor 90,000.00 90,000.00
68,401,500.00
G.7 1 m³ Membuat beton bertulang, 1 PC : 1 Ps : 2 krk
479.0000 kg Semen PC @ 50 kg 86,000.00 41,194,000.00
0.3700 m³ Pasir ayak untuk beton 450,000.00 166,500.00
0.7400 m³ Batu pecah 2 - 3 (cm) 455,520.00 337,084.80
1.6500 Oh Pekerja tak terlatih 100,000.00 165,000.00
0.2500 Oh Tukang batu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0800 Oh Mandor 90,000.00 7,200.00
41,896,909.80
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
G.8 1 m³ Membuat beton bertulang, 1 PC : 2 Ps : 4 krk
280.0000 kg Semen PC @ 50 kg 86,000.00 24,080,000.00
0.4500 m³ Pasir ayak untuk beton 450,000.00 202,500.00
0.9000 m³ Batu pecah 2 - 3 (cm) 455,520.00 409,968.00
1.6500 Oh Pekerja tak terlatih 100,000.00 165,000.00
0.2500 Oh Tukang batu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0800 Oh Mandor 90,000.00 7,200.00
24,891,793.00
G.9 1 m³ Membuat beton bertulang, 1 PC : 1,5 Ps : 3 split
367.0000 kg Semen PC @ 50 kg 86,000.00 31,562,000.00
0.4400 m³ Pasir ayak untuk beton 450,000.00 198,000.00
0.8800 m³ Batu pecah 2 - 3 (cm) 455,520.00 400,857.60
2.0000 Oh Pekerja tak terlatih 100,000.00 200,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
1.0000 Oh Mandor 90,000.00 90,000.00
32,488,832.60
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
G.10 1 m³ Membuat beton bertulang, 1 PC : 2 Ps : 3 split
336.0000 kg Semen PC @ 50 kg 86,000.00 28,896,000.00
0.5400 m³ Pasir ayak untuk beton 450,000.00 243,000.00
0.8100 m³ Batu pecah 2 - 3 (cm) 455,520.00 368,971.20
2.0000 Oh Pekerja tak terlatih 100,000.00 200,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
1.0000 Oh Mandor 90,000.00 90,000.00
29,835,946.20
G.11 1 m³ Membuat tiang pancang prestressed beton
440.0000 kg Semen PC @ 50 kg 86,000.00 37,840,000.00
0.5000 m³ Pasir ayak untuk beton 450,000.00 225,000.00
0.8000 m³ Batu pecah 2 - 3 (cm) 455,520.00 364,416.00
2.4600 Gln Rapidrant 3,400.00 8,364.00
1.6500 Oh Pekerja tak terlatih 100,000.00 165,000.00
0.2500 Oh Tukang batu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0800 Oh Mandor 90,000.00 7,200.00
38,637,105.00
G.12 1 m³ Membuat beton kedap air dengan strorox-100
400.0000 kg Semen PC @ 50 kg 86,000.00 34,400,000.00
0.4800 m³ Pasir ayak untuk beton 450,000.00 216,000.00
0.8000 m³ Batu pecah 2 - 3 (cm) 455,520.00 364,416.00
1.2000 kg Streorox - 100 76,500.00 91,800.00
2.0000 Oh Pekerja tak terlatih 100,000.00 200,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
1.0000 Oh Mandor 90,000.00 90,000.00
35,400,191.00
G.13 1 kg Pembesian dengan besi polos/ulir
1.0500 kg Besi beton 27,000.00 28,350.00
0.0150 kg Kawat beton 22,050.00 330.75
0.0070 Oh Pekerja tak terlatih 100,000.00 700.00
0.0070 Oh Tukang besi / tukang las 100,000.00 700.00
0.0007 Oh Kepala tukang 85,000.00 59.50
0.0003 Oh Mandor 90,000.00 27.00
30,167.25
G.14 1 kg Kabel prestressed polos / strands
1.0500 kg Besi prestressed polos #N/A #N/A
0.0100 kg Kawat beton 22,050.00 220.50
0.0050 Oh Pekerja tak terlatih 100,000.00 500.00
0.0050 Oh Tukang besi / tukang las 100,000.00 500.00
0.0005 Oh Kepala tukang 85,000.00 42.50
0.0003 Oh Mandor 90,000.00 27.00
#N/A
G.15 1 kg Jaring kawat baja
1.0200 kg Besi jaring kawat baja #N/A #N/A
0.8050 kg Kawat beton 22,050.00 17,750.25
0.0250 Oh Pekerja tak terlatih 100,000.00 2,500.00
0.0250 Oh Tukang besi / tukang las 100,000.00 2,500.00
0.0025 Oh Kepala tukang 85,000.00 212.50
0.0015 Oh Mandor 90,000.00 135.00
#N/A
G.16 Pembongkaran Bekisting 1 m³ beton
2.0000 Oh Pekerja tak terlatih 100,000.00 200,000.00
200,000.00
G.17 1 m³ Membuat dinding beton bertulang (150 kg besi + bekisting)
0.2400 m³ Kayu gergajian kelas IV, papan 1,676,800.00 402,432.00
3.2000 kg Paku berbagai ukuran (2" - 5") 45,000.00 144,000.00
1.6000 ltr Minyak bekisting 9,700.00 15,520.00
150.0000 kg Besi beton 27,000.00 4,050,000.00
2.2500 kg Kawat beton 22,050.00 49,612.50
323.0000 kg Semen PC @ 50 kg 86,000.00 27,778,000.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
0.5200 m³ Pasir ayak untuk beton 450,000.00 234,000.00
0.7800 m³ Batu pecah 2 - 3 (cm) 455,520.00 355,305.60
0.1600 m³ Kayu gergajian kelas IV, balok 1,919,318.71 307,090.99
2.8000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 121,800.00 341,040.00
24.0000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 39,600,000.00
5.6000 Oh Pekerja tak terlatih 100,000.00 560,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
2.6400 Oh Tukang kayu 100,000.00 264,000.00
1.0500 Oh Tukang besi / tukang las 100,000.00 105,000.00
0.4000 Oh Kepala tukang 85,000.00 34,000.00
0.1930 Oh Mandor 90,000.00 17,370.00
74,292,371.09
G.18 1 m² Pasang bekisting untuk pondasi
0.0400 m³ Kayu gergajian kelas IV, papan 1,676,800.00 67,072.00
0.3000 kg Paku berbagai ukuran (2" - 5") 45,000.00 13,500.00
0.1000 ltr Minyak bekisting 9,700.00 970.00
0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00
0.0260 Oh Tukang kayu 100,000.00 2,600.00
0.0260 Oh Kepala tukang 85,000.00 2,210.00
0.0050 Oh Mandor 90,000.00 450.00
116,802.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
G.19 1 m² Pasang bekisting untuk sloof
0.0450 m³ Kayu gergajian kelas IV, papan 1,676,800.00 75,456.00
0.3000 kg Paku berbagai ukuran (2" - 5") 45,000.00 13,500.00
0.1000 ltr Minyak bekisting 9,700.00 970.00
0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00
0.0260 Oh Tukang kayu 100,000.00 2,600.00
0.0260 Oh Kepala tukang 85,000.00 2,210.00
0.0050 Oh Mandor 90,000.00 450.00
125,186.00
Untuk 1 m³ beton memerlukan bekisting = 5,77 x 125,186.00 722,323.22

G.20 1 m² Pasang bekisting untuk kolom


0.0400 m³ Kayu gergajian kelas IV, papan 1,676,800.00 67,072.00
0.4000 kg Paku berbagai ukuran (2" - 5") 45,000.00 18,000.00
0.2000 ltr Minyak bekisting 9,700.00 1,940.00
0.0150 m³ Kayu gergajian kelas IV, balok 1,919,318.71 28,789.78
0.3500 lbr Plywood uk. 1,22 x 2,44 (m), tebal 9 mm 130,600.00 45,710.00
2.0000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 3,300,000.00
0.3000 Oh Pekerja tak terlatih 100,000.00 30,000.00
0.3300 Oh Tukang kayu 100,000.00 33,000.00
0.0330 Oh Kepala tukang 85,000.00 2,805.00
0.0060 Oh Mandor 90,000.00 540.00
3,527,856.78
Untuk 1 m³ beton memerlukan bekisting = 11,54 x 3,527,856.78 40,711,467.25

G.21 1 m² Pasang bekisting untuk balok


0.0400 m³ Kayu gergajian kelas IV, papan 1,676,800.00 67,072.00
0.4000 kg Paku berbagai ukuran (2" - 5") 45,000.00 18,000.00
0.2000 ltr Minyak bekisting 9,700.00 1,940.00
0.0180 m³ Kayu gergajian kelas IV, balok 1,919,318.71 34,547.74
0.3500 lbr Plywood uk. 1,22 x 2,44 (m), tebal 9 mm 130,600.00 45,710.00
2.0000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 3,300,000.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.3300 Oh Tukang kayu 100,000.00 33,000.00
0.0330 Oh Kepala tukang 85,000.00 2,805.00
0.0060 Oh Mandor 90,000.00 540.00
3,535,614.74
Untuk 1 m³ beton memerlukan bekisting = 8,65 x 3,535,614.74 30,583,067.47

G.22 1 m² Pasang bekisting untuk lantai


0.0400 m³ Kayu gergajian kelas IV, papan 1,676,800.00 67,072.00
0.4000 kg Paku berbagai ukuran (2" - 5") 45,000.00 18,000.00
0.2000 ltr Minyak bekisting 9,700.00 1,940.00
0.0150 m³ Kayu gergajian kelas IV, balok 1,919,318.71 28,789.78
0.3500 lbr Plywood uk. 1,22 x 2,44 (m), tebal 9 mm 130,600.00 45,710.00
6.0000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 9,900,000.00
0.3200 Oh Pekerja tak terlatih 100,000.00 32,000.00
0.3300 Oh Tukang kayu 100,000.00 33,000.00
0.0330 Oh Kepala tukang 85,000.00 2,805.00
0.0060 Oh Mandor 90,000.00 540.00
10,129,856.78
Untuk 1 m³ beton memerlukan Bekisting = 8,33 x 10,129,856.78 84,381,706.98

G.23 1 m³ Membuat beton mutu K. 225


338.0000 kg Semen PC @ 50 kg 86,000.00 29,068,000.00
0.6500 m³ Pasir ayak untuk beton 450,000.00 292,500.00
0.6500 m³ Batu pecah 2 - 3 (cm) 455,520.00 296,088.00
6.0000 Oh Pekerja tak terlatih 100,000.00 600,000.00
1.0000 Oh Tukang batu 100,000.00 100,000.00
0.1000 Oh Kepala tukang 85,000.00 8,500.00
0.3000 Oh Mandor 90,000.00 27,000.00
30,392,088.00
G.24 1 m³ Membuat beton mutu K. 275
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
400.0000 kg Semen PC @ 50 kg 86,000.00 34,400,000.00
0.4000 m³ Pasir ayak untuk beton 450,000.00 180,000.00
0.8200 m³ Batu pecah 2 - 3 (cm) 455,520.00 373,526.40
6.0000 Oh Pekerja tak terlatih 100,000.00 600,000.00
1.0000 Oh Tukang batu 100,000.00 100,000.00
0.1000 Oh Kepala tukang 85,000.00 8,500.00
0.3000 Oh Mandor 90,000.00 27,000.00
35,689,026.40
G.25 1 m² Pasang bekisting untuk jembatan cor
0.0264 m³ Kayu gergajian kelas IV, papan 1,676,800.00 44,267.52
0.6000 kg Paku berbagai ukuran (2" - 5") 45,000.00 27,000.00
0.5000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 825,000.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.0500 Oh Tukang batu 100,000.00 5,000.00
0.0050 Oh Kepala tukang 85,000.00 425.00
0.0070 Oh Mandor 90,000.00 630.00
917,322.52
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
G.26 1 m³ Membuat pondasi beton bertulang (150 kg besi + bekisting)
0.2000 m³ Kayu gergajian kelas IV, papan 1,676,800.00 335,360.00
1.5000 kg Paku berbagai ukuran (2" - 5") 45,000.00 67,500.00
0.4000 ltr Minyak bekisting 9,700.00 3,880.00
150.0000 kg Besi beton 27,000.00 4,050,000.00
2.2500 kg Kawat beton 22,050.00 49,612.50
323.0000 kg Semen PC @ 50 kg 86,000.00 27,778,000.00
0.5200 m³ Pasir ayak untuk beton 450,000.00 234,000.00
0.7800 m³ Batu pecah 2 - 3 (cm) 455,520.00 355,305.60
3.9000 Oh Pekerja tak terlatih 100,000.00 390,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
1.0400 Oh Tukang kayu 100,000.00 104,000.00
1.0500 Oh Tukang besi / tukang las 100,000.00 105,000.00
0.2450 Oh Kepala tukang 85,000.00 20,825.00
0.1650 Oh Mandor 90,000.00 14,850.00
33,543,333.10
G.27 1 m³ Membuat sloof beton bertulang (200 kg besi + bekisting)
0.2700 m³ Kayu gergajian kelas IV, papan 1,676,800.00 452,736.00
2.0000 kg Paku berbagai ukuran (2" - 5") 45,000.00 90,000.00
0.6000 ltr Minyak bekisting 9,700.00 5,820.00
200.0000 kg Besi beton 27,000.00 5,400,000.00
3.0000 kg Kawat beton 22,050.00 66,150.00
323.0000 kg Semen PC @ 50 kg 86,000.00 27,778,000.00
0.5200 m³ Pasir ayak untuk beton 450,000.00 234,000.00
0.7800 m³ Batu pecah 2 - 3 (cm) 455,520.00 355,305.60
4.8500 Oh Pekerja tak terlatih 100,000.00 485,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
1.5600 Oh Tukang kayu 100,000.00 156,000.00
1.4000 Oh Tukang besi / tukang las 100,000.00 140,000.00
0.3310 Oh Kepala tukang 85,000.00 28,135.00
0.1700 Oh Mandor 90,000.00 15,300.00
35,241,446.60
G.28 1 m³ Membuat kolom beton bertulang (150 kg besi + bekisting)
0.3200 m³ Kayu gergajian kelas IV, papan 1,676,800.00 536,576.00
3.2000 kg Paku berbagai ukuran (2" - 5") 45,000.00 144,000.00
1.6000 ltr Minyak bekisting 9,700.00 15,520.00
150.0000 kg Besi beton 27,000.00 4,050,000.00
2.2500 kg Kawat beton 22,050.00 49,612.50
323.0000 kg Semen PC @ 50 kg 86,000.00 27,778,000.00
0.5200 m³ Pasir ayak untuk beton 450,000.00 234,000.00
0.7800 m³ Batu pecah 2 - 3 (cm) 455,520.00 355,305.60
0.1200 m³ Kayu gergajian kelas IV, balok 1,919,318.71 230,318.25
2.8000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 9 mm 130,600.00 365,680.00
32.0000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 52,800,000.00
5.8000 Oh Pekerja tak terlatih 100,000.00 580,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
2.8000 Oh Tukang kayu 100,000.00 280,000.00
1.0500 Oh Batu pecah 2 - 3 (cm) 455,520.00 478,296.00
0.4200 Oh Kepala tukang 85,000.00 35,700.00
0.1850 Oh Mandor 90,000.00 16,650.00
87,984,658.35
G.29 1 m³ Membuat kolom beton bertulang (300 kg besi + bekisting)
0.4000 m³ Kayu gergajian kelas IV, papan 1,676,800.00 670,720.00
4.0000 kg Paku berbagai ukuran (2" - 5") 45,000.00 180,000.00
2.0000 ltr Minyak bekisting 9,700.00 19,400.00
300.0000 kg Besi beton 27,000.00 8,100,000.00
4.5000 kg Kawat beton 22,050.00 99,225.00
323.0000 kg Semen PC @ 50 kg 86,000.00 27,778,000.00
0.5200 m³ Pasir ayak untuk beton 450,000.00 234,000.00
0.7800 m³ Batu pecah 2 - 3 (cm) 455,520.00 355,305.60
0.1500 m³ Kayu gergajian kelas IV, balok 1,919,318.71 287,897.81
3.5000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 9 mm 130,600.00 457,100.00
20.0000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 33,000,000.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
7.3000 Oh Pekerja tak terlatih 100,000.00 730,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
3.3000 Oh Tukang kayu 100,000.00 330,000.00
2.1000 Oh Tukang besi / tukang las 100,000.00 210,000.00
0.5700 Oh Kepala tukang 85,000.00 48,450.00
0.2500 Oh Mandor 90,000.00 22,500.00
72,557,598.41
G.30 1 m³ Membuat dinding beton bertulang (150 kg besi + bekisting)
0.2400 m³ Kayu gergajian kelas IV, papan 1,676,800.00 402,432.00
3.2000 kg Paku berbagai ukuran (2" - 5") 45,000.00 144,000.00
1.6000 ltr Minyak bekisting 9,700.00 15,520.00
150.0000 kg Besi beton 27,000.00 4,050,000.00
2.2500 kg Kawat beton 22,050.00 49,612.50
323.0000 kg Semen PC @ 50 kg 86,000.00 27,778,000.00
0.5200 m³ Pasir ayak untuk beton 450,000.00 234,000.00
0.7800 m³ Batu pecah 2 - 3 (cm) 455,520.00 355,305.60
0.1600 m³ Kayu gergajian kelas IV, balok 1,919,318.71 307,090.99
2.8000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 9 mm 130,600.00 365,680.00
24.0000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 39,600,000.00
5.6000 Oh Pekerja tak terlatih 100,000.00 560,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
2.6400 Oh Tukang kayu 100,000.00 264,000.00
1.0500 Oh Tukang besi / tukang las 100,000.00 105,000.00
0.4000 Oh Kepala tukang 85,000.00 34,000.00
0.1930 Oh Mandor 90,000.00 17,370.00
74,317,011.09
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
G.31 1 m³ Membuat dinding beton bertulang (200 kg besi + bekisting)/(non SNI)
0.2500 m³ Kayu gergajian kelas IV, papan 1,676,800.00 419,200.00
3.0000 kg Paku berbagai ukuran (2" - 5") 45,000.00 135,000.00
1.2000 ltr Minyak bekisting 9,700.00 11,640.00
200.0000 kg Besi beton 27,000.00 5,400,000.00
3.0000 kg Kawat beton 22,050.00 66,150.00
323.0000 kg Semen PC @ 50 kg 86,000.00 27,778,000.00
0.5200 m³ Pasir ayak untuk beton 450,000.00 234,000.00
0.7800 m³ Batu pecah 2 - 3 (cm) 455,520.00 355,305.60
0.1050 m³ Kayu gergajian kelas IV, balok 1,919,318.71 201,528.46
2.5000 lbr Plywood uk. 1,22 x 2,44 (m), tebal 9 mm 130,600.00 326,500.00
14.0000 btg Kayu dolken ø 8 - 10 (cm) panjang 4 m / kiau 1,650,000.00 23,100,000.00
5.6000 Oh Pekerja tak terlatih 100,000.00 560,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
2.3000 Oh Tukang kayu 100,000.00 230,000.00
1.4000 Oh Tukang besi / tukang las 100,000.00 140,000.00
0.4050 Oh Kepala tukang 85,000.00 34,425.00
0.2020 Oh Mandor 90,000.00 18,180.00
59,044,929.06
G.32 1 m' Membuat kolom penguat beton bertulang uk. 11 cm x 11 cm
0.0020 m³ Kayu gergajian kelas IV, papan 1,676,800.00 3,353.60
0.0100 kg Paku berbagai ukuran (2" - 5") 45,000.00 450.00
3.0000 kg Besi beton 27,000.00 81,000.00
0.4500 kg Kawat beton 22,050.00 9,922.50
4.0000 kg Semen PC @ 50 kg 86,000.00 344,000.00
0.0060 m³ Pasir ayak untuk beton 450,000.00 2,700.00
0.0090 m³ Batu pecah 2 - 3 (cm) 455,520.00 4,099.68
0.0600 Oh Pekerja tak terlatih 100,000.00 6,000.00
0.0200 Oh Tukang batu 100,000.00 2,000.00
0.0200 Oh Tukang kayu 100,000.00 2,000.00
0.0200 Oh Tukang besi / tukang las 100,000.00 2,000.00
0.0060 Oh Kepala tukang 85,000.00 510.00
0.0030 Oh Mandor 90,000.00 270.00
458,305.78
G.33 1 m' Membuat ringbalk beton bertulang uk. 10 cm x 15 cm
0.0030 m³ Kayu gergajian kelas IV, papan 1,676,800.00 5,030.40
0.0200 kg Paku berbagai ukuran (2" - 5") 45,000.00 900.00
3.6000 kg Besi beton 27,000.00 97,200.00
0.0500 kg Kawat beton 22,050.00 1,102.50
5.5000 kg Semen PC @ 50 kg 86,000.00 473,000.00
0.0090 m³ Pasir ayak untuk beton 450,000.00 4,050.00
0.0150 m³ Batu pecah 2 - 3 (cm) 455,520.00 6,832.80
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.0330 Oh Tukang batu 100,000.00 3,300.00
0.0330 Oh Tukang kayu 100,000.00 3,300.00
0.0330 Oh Tukang besi / tukang las 100,000.00 3,300.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0050 Oh Mandor 90,000.00 450.00
609,315.70
G.34 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk sloof, dengan pembesian 100 kg
G.19 Bekisting 722,323.22
G.10 Beton 29,835,946.20
G.13 Besi 3,016,725.00
G.16 Bongkaran 200,000.00
33,774,994.42
G.35 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk kolom, dengan pembesian 100 kg
G.20 Bekisting 40,711,467.25
G.10 Beton 29,835,946.20
G.13 Besi 3,016,725.00
G.16 Bongkaran 200,000.00
73,764,138.45
G.36 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk balok, dengan pembesian 100 kg
G.21 Bekisting 30,583,067.47
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
G.10 Beton 29,835,946.20
G.13 Besi 3,016,725.00
G.16 Bongkaran 200,000.00
63,635,738.67
G.37 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan pembesian 100 kg
G.22 Bekisting 84,381,706.98
G.10 Beton 29,835,946.20
G.13 Besi 3,016,725.00
G.16 Bongkaran 200,000.00
117,434,378.18

G.38 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan pembesian 75 kg


G.22 Bekisting 84,381,706.98
G.10 Beton 29,835,946.20
G.13 Besi 2,262,543.75
G.16 Bongkaran 200,000.00
116,680,196.93
G.39 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan Pembesian 200 kg
G.27 Beton Bertulang + Bekesting 35,241,446.60
G.13 Besi 6,033,450.00
G.16 Bongkaran 200,000.00
41,474,896.60
G.40 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk sloof, dengan pembesian 75 kg
G.19 Bekisting 722,323.22
G.10 Beton 29,835,946.20
G.13 Besi 2,262,543.75
G.16 Bongkaran 200,000.00
33,020,813.17
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

H.1 1 m² Pasang atap genteng kodok / glazzur


25.0000 bh Atap genteng kodok 3,150.00 78,750.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.0750 Oh Tukang kayu 100,000.00 7,500.00
0.0080 Oh Kepala tukang 85,000.00 680.00
0.0080 Oh Mandor 90,000.00 720.00
102,650.00
H.2 1 m² Pasang roof light fibreglass uk. 180 cm x 90 cm
0.6000 lbr Rooflight fibreglass uk. 1,8 x 0,9 (m) 123,600.00 74,160.00
0.0500 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,875.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0670 Oh Tukang kayu 100,000.00 6,700.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
97,960.00
H.3 1 m² Pasang atap asbes gelombang uk. 2.500 mm x 920 mm, tebal 5 mm
0.5000 lbr Atap asbes gelombang uk. 2,50 x 0,92 (m) tebal 5 mm 143,000.00 71,500.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0750 Oh Tukang kayu 100,000.00 7,500.00
0.0080 Oh Kepala tukang 85,000.00 680.00
0.0080 Oh Mandor 90,000.00 720.00
99,440.00
H.4 1 m² Pasang atap asbes gelombang uk. 2.250 mm x 920 mm, tebal 5 mm
0.6000 lbr Atap asbes gelombang uk. 2,25 x 0,92 (m) tebal 5 mm 128,700.00 77,220.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0750 Oh Tukang kayu 100,000.00 7,500.00
0.0080 Oh Kepala tukang 85,000.00 680.00
0.0080 Oh Mandor 90,000.00 720.00
105,160.00
H.5 1 m² Pasang atap asbes gelombang uk. 2.000 mm x 920 mm, tebal 5 mm
0.6000 lbr Atap asbes gelombang uk. 2,00 x 0,92 (m) tebal 5 mm 114,400.00 68,640.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0750 Oh Tukang kayu 100,000.00 7,500.00
0.0080 Oh Kepala tukang 85,000.00 680.00
0.0080 Oh Mandor 90,000.00 720.00
96,580.00
H.6 1 m² Pasang atap asbes gelombang uk. 1.800 mm x 920 mm, tebal 5 mm
0.7500 lbr Atap asbes gelombang uk. 1,80 x 0,92 (m) tebal 5 mm 41,000.00 30,750.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0700 Oh Tukang kayu 100,000.00 7,000.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
58,015.00
H.7 1 m² Pasang atap asbes gelombang uk. 3.000 mm x 1.050 mm, tebal 4 mm
0.3500 lbr Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm 126,800.00 44,380.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0700 Oh Tukang kayu 100,000.00 7,000.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
71,645.00
H.8 1 m² Pasang atap asbes gelombang uk. 2.700 mm x 1.050 mm, tebal 4 mm
0.4200 lbr Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm 116,700.00 49,014.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0700 Oh Tukang kayu 100,000.00 7,000.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP
76,279.00
H.9 1 m² Pasang atap asbes gelombang uk. 2.400 mm x 1.050 mm, tebal 4 mm
0.4400 lbr Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm 96,400.00 42,416.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0670 Oh Tukang kayu 100,000.00 6,700.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
69,381.00
H.10 1 m² Pasang atap asbes gelombang uk. 2.100 mm x 1.050 mm, tebal 4 mm
0.5100 lbr Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm 91,600.00 46,716.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0670 Oh Tukang kayu 100,000.00 6,700.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
73,681.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP
H.11 1 m² Pasang atap asbes gelombang uk. 1.500 mm x 1.050 mm, tebal 4 mm
0.8000 lbr Atap asbes gelombang uk. 1,50 x 1,05 (m) tebal 4 mm 71,500.00 57,200.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0670 Oh Tukang kayu 100,000.00 6,700.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
84,165.00
H.12 1 m² Pasang atap asbes gelombang uk. 3.000 mm x 1.080 mm, tebal 6 mm
0.3700 lbr Atap asbes gelombang uk. 3,00 x 1,08 (m) tebal 6 mm 189,700.00 70,189.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0670 Oh Tukang kayu 100,000.00 6,700.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
97,154.00
H.13 1 m² Pasang atap asbes gelombang uk. 2.700 mm x 1.080 mm, tebal 6 mm
0.3800 lbr Atap asbes gelombang uk. 2,70 x 1,08 (m) tebal 6 mm 175,000.00 66,500.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0670 Oh Tukang kayu 100,000.00 6,700.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
93,465.00
H.14 1 m² Pasang atap asbes gelombang uk. 2.400 mm x 1.080 mm, tebal 6 mm
0.4600 lbr Atap asbes gelombang uk. 2,40 x 1,08 (m) tebal 6 mm 144,600.00 66,516.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0670 Oh Tukang kayu 100,000.00 6,700.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
93,481.00
H.15 1 m² Pasang atap asbes gelombang uk. 2.100 mm x 1.080 mm, tebal 6 mm
0.4900 lbr Atap asbes gelombang uk. 2,10 x 1,08 (m) tebal 6 mm 137,100.00 67,179.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0670 Oh Tukang kayu 100,000.00 6,700.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
94,144.00
H.16 1 m² Pasang atap asbes gelombang uk. 1.800 mm x 1.080 mm, tebal 6 mm
0.5700 lbr Atap asbes gelombang uk. 1,80 x 1,08 (m) tebal 6 mm 55,500.00 31,635.00
0.1200 kg Paku asbes 42,000.00 5,040.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0670 Oh Tukang kayu 100,000.00 6,700.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
58,600.00
H.17 1 m² Pasang atap genteng beton
11.0000 bh Atap genteng beton ( jenis press) 4,961.25 54,573.75
0.0300 kg Paku berbagai ukuran (2" - 5") 45,000.00 1,350.00
0.2000 Oh Pekerja tak terlatih 100,000.00 20,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0100 Oh Mandor 90,000.00 900.00
87,673.75
H.18 1 m² Pasang atap metal
1.0200 lbr Atap metal (biasa / polos) 88,300.00 90,066.00
0.2000 kg Paku anti Karat 37,900.00 7,580.00
0.2000 Oh Pekerja tak terlatih 100,000.00 20,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0100 Oh Mandor 90,000.00 900.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP
129,396.00
H.19 1 m² Pasang atap alumunium super sheet
1.0500 m² Atap alumunium super sheet uk. 1,8 x 6 (m), t = 0,2 mm (berwarna) 265,800.00 279,090.00
0.0200 kg Paku kait 1,700.00 34.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.7500 Oh Tukang kayu 100,000.00 75,000.00
0.0080 Oh Kepala tukang 85,000.00 680.00
0.0060 Oh Mandor 90,000.00 540.00
370,344.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP
H.20 1 m² Pasang atap seng gelombang
0.7000 lbr Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) 74,800.00 52,360.00
0.0200 kg Paku seng 45,000.00 900.00
0.1200 Oh Pekerja tak terlatih 100,000.00 12,000.00
0.0600 Oh Tukang kayu 100,000.00 6,000.00
0.0060 Oh Kepala tukang 85,000.00 510.00
0.0060 Oh Mandor 90,000.00 540.00
72,310.00
H.21 1 m² Pasang atap nok seng
0.3000 lbr Seng plat BJLS 27 uk. 20" 78,000.00 23,400.00
0.0400 kg Paku seng 45,000.00 1,800.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.0700 Oh Tukang kayu 100,000.00 7,000.00
0.0080 Oh Kepala tukang 85,000.00 680.00
0.0060 Oh Mandor 90,000.00 540.00
48,420.00
H.22 1 m' Pasang atap nok genteng kodok
5.0000 bh Bubungan atap (nok) genteng kodok 7,200.00 36,000.00
8.0000 kg Semen PC @ 50 kg 86,000.00 688,000.00
0.0320 m³ Pasir pasang 450,000.00 14,400.00
0.4000 Oh Pekerja tak terlatih 100,000.00 40,000.00
0.2000 Oh Tukang kayu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0020 Oh Mandor 90,000.00 180.00
800,280.00
H.23 1 m' Pasang atap nok genteng beton
3.5000 lbr Bubungan atap (nok) genteng beton 5,433.75 19,018.13
0.0500 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,250.00
10.8000 kg Semen PC @ 50 kg 86,000.00 928,800.00
0.0320 m³ Pasir pasang 450,000.00 14,400.00
1.0000 kg Semen Warna 15,000.00 15,000.00
0.4000 Oh Pekerja tak terlatih 100,000.00 40,000.00
0.2000 Oh Tukang kayu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0200 Oh Mandor 90,000.00 1,800.00
1,042,968.13
H.24 1 m' Pasang atap nok genteng metal
1.1000 lbr Bubungan atap (nok) metal (standar Rainbow) 69,700.00 76,670.00
0.0500 kg Paku anti Karat 37,900.00 1,895.00
0.2500 Oh Pekerja tak terlatih 100,000.00 25,000.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.1500 Oh Kepala tukang 85,000.00 12,750.00
0.0130 Oh Mandor 90,000.00 1,170.00
132,485.00
H.25 1 m' Pasang atap nok alumunium
1.2000 m² Bubungan atap (nok) alumunium standar 40 cm, swg. 22 85,600.00 102,720.00
0.0400 kg Paku kait 1,700.00 68.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
1.0000 Oh Tukang kayu 100,000.00 100,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0100 Oh Mandor 90,000.00 900.00
214,538.00
H.26 1 m' Pasang atap nok genteng soka
4.0000 bh Bubungan atap (nok) genteng soka 4,680.00 18,720.00
8.0000 kg Semen PC @ 50 kg 86,000.00 688,000.00
0.0320 m³ Pasir pasang 450,000.00 14,400.00
0.4000 Oh Pekerja tak terlatih 100,000.00 40,000.00
0.2000 Oh Tukang kayu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0020 Oh Mandor 90,000.00 180.00
783,000.00
H.27 1 m² Pasang Aluminium Foil
1.0500 m² Aluminium foil 92,000.00 96,600.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP
0.2000 Oh Pekerja tak terlatih 100,000.00 20,000.00
0.0200 Oh Tukang kayu 100,000.00 2,000.00
0.0020 Oh Kepala tukang 85,000.00 170.00
0.0080 oh Mandor 90,000.00 720.00
119,490.00
H.28 1 m² Pasang atap metal batuan /tekstur
1.0200 lbr Atap metal batuan /tekstur 97,100.00 99,042.00
0.2000 kg Paku anti Karat 37,900.00 7,580.00
0.2000 Oh Pekerja tak terlatih 100,000.00 20,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0100 Oh Mandor 90,000.00 900.00
138,372.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
I. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT

I.1 1 m² Langit-langit asbes 1 m x 1 m, tebal 4 mm


1.1000 lbr Eternit asbes uk. 1 x 1 (m), tebal 4 mm 32,700.00 35,970.00
0.0100 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 375.00
0.0300 Oh Pekerja tak terlatih 100,000.00 3,000.00
0.0700 Oh Tukang kayu 100,000.00 7,000.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0015 Oh Mandor 90,000.00 135.00
47,075.00
I.2 1 m² Langit-langit asbes 1 m x 1 m, tebal 5 mm
1.1000 lbr Eternit asbes uk. 1 x 1 (m), tebal 5 mm 34,400.00 37,840.00
0.0100 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 375.00
0.0300 Oh Pekerja tak terlatih 100,000.00 3,000.00
0.0700 Oh Tukang kayu 100,000.00 7,000.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0015 Oh Mandor 90,000.00 135.00
48,945.00
I.3 1 m² Langit-langit asbes 1 m x 1 m, tebal 6 mm
1.1000 lbr Eternit asbes uk. 1 x 1 (m), tebal 6 mm 37,100.00 40,810.00
0.0100 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 375.00
0.0300 Oh Pekerja tak terlatih 100,000.00 3,000.00
0.0700 Oh Tukang kayu 100,000.00 7,000.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0015 Oh Mandor 90,000.00 135.00
51,915.00
I.4 1 m² Langit-langit akustik uk. 30 cm x 30 cm + rangka alumunium (non SNI)
11.2000 lbr Langit-langit Accoustic board / tile uk. 0,30 x 0,30 (m) 68,800.00 770,560.00
0.8500 m' Rangka / frame accoustic board - main tee 55,600.00 47,260.00
1.6750 m' Rangka / frame accoustic board - cross tee 45,900.00 76,882.50
0.0650 m' Rangka / frame accoustic board - wall angle 61,800.00 4,017.00
0.6000 m' Rangka / frame accoustic board - rod / adjustable dia. 4 mm 26,500.00 15,900.00
1.0000 bh Dina bolt / ramset 2,200.00 2,200.00
0.0600 Oh Pekerja tak terlatih 100,000.00 6,000.00
0.1200 Oh Tukang kayu 100,000.00 12,000.00
0.0120 Oh Kepala tukang 85,000.00 1,020.00
0.0030 Oh Mandor 90,000.00 270.00
936,109.50
I.5 1 m² Langit-langit akustik uk. 30 cm x 60 cm + rangka alumunium
0.5600 lbr Langit-langit Accoustic board / tile uk. 0,30 x 0,60 (m) 70,600.00 39,536.00
0.8500 m' Profil aluminium T 45,900.00 39,015.00
0.1500 kg Kawat seng polos 20,300.00 3,045.00
1.0000 bh Dina bolt / ramset 2,200.00 2,200.00
0.0600 Oh Pekerja tak terlatih 100,000.00 6,000.00
0.1200 Oh Tukang kayu 100,000.00 12,000.00
0.0120 Oh Kepala tukang 85,000.00 1,020.00
0.0030 Oh Mandor 90,000.00 270.00
103,086.00
I.6 1 m² Langit-langit akustik uk. 60 cm x 120 cm + rangka alumunium
1.5000 lbr Langit-langit Accoustic board / tile uk. 0,60 x 1,20 x 0,14 (m) 86,500.00 129,750.00
3.6000 m' Profil Aluminium T 45,900.00 165,240.00
0.1500 kg Kawat seng polos 20,300.00 3,045.00
1.0000 bh Dina bolt / ramset 2,200.00 2,200.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.5000 Oh Tukang kayu 100,000.00 50,000.00
0.0500 Oh Kepala tukang 85,000.00 4,250.00
0.0075 Oh Mandor 90,000.00 675.00
370,160.00
I.7 1 m² Langit-langit plywood uk. 30 cm x 60 cm, tebal 4 mm
0.3600 lbr Plywood uk. 0,30 x 0,60 (m), tebal 4mm 73,200.00 26,352.00
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.0700 Oh Pekerja tak terlatih 100,000.00 7,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
I. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT
0.0035 Oh Mandor 90,000.00 315.00
45,642.00

I.8 1 m² Langit-langit plywood uk. 30 cm x 60 cm, tebal 6 mm


0.3600 lbr Plywood uk. 0,30 x 0,60 (m), tebal 6mm 79,400.00 28,584.00
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.0700 Oh Pekerja tak terlatih 100,000.00 7,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0035 Oh Mandor 90,000.00 315.00
47,874.00
I.9 1 m² Langit-langit plywood uk. 60 cm x 120 cm, tebal 4 mm
0.3750 lbr Plywood uk. 0,60 x 1,20 (m), tebal 4mm 77,700.00 29,137.50
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.0700 Oh Pekerja tak terlatih 100,000.00 7,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0035 Oh Mandor 90,000.00 315.00
48,427.50
I.10 1 m² Langit-langit plywood uk. 60 cm x 120 cm, tebal 6 mm
0.3750 lbr Plywood uk. 0,60 x 1,20 (m), tebal 4mm 77,700.00 29,137.50
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.0700 Oh Pekerja tak terlatih 100,000.00 7,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0035 Oh Mandor 90,000.00 315.00
48,427.50
I.11 1 m² Langit-langit teakwood uk. 30 cm x 60 cm, tebal 4 mm
0.3600 lbr Teak wood 0,30 x 0,60 (m), tebal 4 mm 76,500.00 27,540.00
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.0700 Oh Pekerja tak terlatih 100,000.00 7,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0035 Oh Mandor 90,000.00 315.00
46,830.00
I.12 1 m² Langit-langit soft board
0.0350 lbr Softboard uk. 1,20 x 2,40 (m), tebal 4 mm 76,500.00 2,677.50
0.0300 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 1,125.00
0.0600 Oh Pekerja tak terlatih 100,000.00 6,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0030 Oh Mandor 90,000.00 270.00
20,922.50
I.13 1 m² Langit-langit gypsum board, tebal 9 mm
0.3640 lbr Gypsum board polos uk. 1.22 x 2.44 (m), tebal 9 mm 56,385.00 20,524.14
0.1100 kg Paku sekrup 1,800.00 198.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.0500 Oh Tukang kayu 100,000.00 5,000.00
0.0050 Oh Kepala tukang 85,000.00 425.00
0.0050 Oh Mandor 90,000.00 450.00
36,597.14
I.14 1 m² Langit-langit akustik uk. 30 cm x 30 cm + rangka kayu kelas III
0.0270 m³ Kayu gergajian kelas III, balok 1,750,000.00 47,250.00
0.0600 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,700.00
11.5000 lbr Langit-langit Accoustic board / tile uk. 0,30 x 0,30 (m) 68,800.00 791,200.00
0.3100 Oh Pekerja tak terlatih 100,000.00 31,000.00
0.4700 Oh Tukang kayu 100,000.00 47,000.00
0.0470 Oh Kepala tukang 85,000.00 3,995.00
0.0155 Oh Mandor 90,000.00 1,395.00
924,540.00
I.15 1 m² Langit-langit akustik uk. 30 cm x 60 cm + rangka kayu kelas III
0.0230 m³ Kayu gergajian kelas III, balok 1,750,000.00 40,250.00
0.0600 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,700.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
I. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT
5.8000 lbr Langit-langit Accoustic board / tile uk. 0,30 x 0,60 (m) 70,600.00 409,480.00
0.2600 Oh Pekerja tak terlatih 100,000.00 26,000.00
0.4000 Oh Tukang kayu 100,000.00 40,000.00
0.0400 Oh Kepala tukang 85,000.00 3,400.00
0.0130 Oh Mandor 90,000.00 1,170.00
523,000.00
I.16 1 m² Langit-langit plywood tebal 4 mm + rangka kayu kelas III
0.3900 lbr Plywood uk. 1,22 x 2,44 (m), tebal 4 mm 121,800.00 47,502.00
0.0600 kg Paku berbagai ukuran (2" - 5") 45,000.00 2,700.00
0.0230 m³ Kayu gergajian kelas III, balok 1,750,000.00 40,250.00
0.2700 Oh Pekerja tak terlatih 100,000.00 27,000.00
0.4000 Oh Tukang kayu 100,000.00 40,000.00
0.0400 Oh Kepala tukang 85,000.00 3,400.00
0.0135 Oh Mandor 90,000.00 1,215.00
162,067.00
I.17 1 m² Kompon Gypsum (nonSNI)
0.3640 lbr Kompon gypsum 47,700.00 17,362.80
0.1100 kg Kain kassa 16,500.00 1,815.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.0500 Oh Tukang kayu 100,000.00 5,000.00
0.0050 Oh Kepala tukang 85,000.00 425.00
0.0050 Oh Mandor 90,000.00 450.00
35,052.80
I.18 1 m² Amplas Gypsum (non SNI)
0.3640 lbr Amplas 11,600.00 4,222.40
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.0500 Oh Tukang kayu 100,000.00 5,000.00
0.0050 Oh Kepala tukang 85,000.00 425.00
0.0050 Oh Mandor 90,000.00 450.00
20,097.40
I.19 1 m' List langit-langit kayu profil
1.1000 m' Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 2,750,000.00
0.0100 kg Paku berbagai ukuran (2" - 5") 45,000.00 450.00
0.0500 Oh Pekerja tak terlatih 100,000.00 5,000.00
0.0500 Oh Tukang kayu 100,000.00 5,000.00
0.0050 Oh Kepala tukang 85,000.00 425.00
0.0030 Oh Mandor 90,000.00 270.00
2,761,145.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI

J.1 Memasang 1 buah klosed duduk / monoblock


1.0000 bh Closed duduk (lokal) 2,047,400.00 2,047,400.00
6.0000 % Perlengkapan (dari harga closed) - 122,844.00
3.3000 Oh Pekerja tak terlatih 100,000.00 330,000.00
1.1000 Oh Tukang batu 100,000.00 110,000.00
0.0010 Oh Kepala tukang 85,000.00 85.00
0.1600 Oh Mandor 90,000.00 14,400.00
2,624,729.00
J.2 Memasang 1 buah klosed jongkok porselin
1.0000 bh Closed jongkok porcelaint (lokal) 460,000.00 460,000.00
6.0000 kg Semen PC @ 50 kg 86,000.00 516,000.00
0.0100 m³ Pasir pasang 450,000.00 4,500.00
1.0000 Oh Pekerja tak terlatih 100,000.00 100,000.00
1.5000 Oh Tukang batu 100,000.00 150,000.00
1.5000 Oh Kepala tukang 85,000.00 127,500.00
0.1600 Oh Mandor 90,000.00 14,400.00
1,372,400.00
J.3 Memasang 1 buah klosed jongkok keramik
1.0000 bh Closed jongkok keramik 181,400.00 181,400.00
7.0000 bh Batu bata Kls I 3,300.00 23,100.00
6.0000 kg Semen PC @ 50 kg 86,000.00 516,000.00
0.0100 m³ Pasir pasang 450,000.00 4,500.00
1.0000 Oh Pekerja tak terlatih 100,000.00 100,000.00
1.5000 Oh Tukang batu 100,000.00 150,000.00
0.3000 Oh Kepala tukang 85,000.00 25,500.00
0.1100 Oh Mandor 90,000.00 9,900.00
1,010,400.00
J.4 Memasang 1 buah urinoir
1.0000 bh Urinoir terasso 67,500.00 67,500.00
30.0000 % Perlengkapan (dari harga urinoir) - 20,250.00
6.0000 kg Semen PC @ 50 kg 86,000.00 516,000.00
0.0100 m³ Pasir pasang 450,000.00 4,500.00
1.0000 Oh Pekerja tak terlatih 100,000.00 100,000.00
1.0000 Oh Tukang batu 100,000.00 100,000.00
0.1000 Oh Kepala tukang 85,000.00 8,500.00
0.1000 Oh Mandor 90,000.00 9,000.00
825,750.00
J.5 Memasang 1 buah wastafel
1.0000 bh Wastafel 750,000.00 750,000.00
12.0000 % Perlengkapan (dari harga wastafel) - 90,000.00
6.0000 kg Semen PC @ 50 kg 86,000.00 516,000.00
0.0100 m³ Pasir pasang 450,000.00 4,500.00
1.2000 Oh Pekerja tak terlatih 100,000.00 120,000.00
1.4500 Oh Tukang batu 100,000.00 145,000.00
0.1500 Oh Kepala tukang 85,000.00 12,750.00
0.1000 Oh Mandor 90,000.00 9,000.00
1,647,250.00
J.6 Memasang 1 buah bak mandi fibreglass vol. 0,3 m³
1.0000 bh Bak mandi fibreglass volume 0,30 m³ 353,000.00 353,000.00
18.0000 % Perlengkapan (dari harga bak) - 63,540.00
1.8000 Oh Pekerja tak terlatih 100,000.00 180,000.00
2.7000 Oh Tukang batu 100,000.00 270,000.00
0.5400 Oh Kepala tukang 85,000.00 45,900.00
0.1100 Oh Mandor 90,000.00 9,900.00
922,340.00
J.7 Memasang 1 buah bak mandi fibreglass vol. 1 m³
1.0000 bh Bak mandi fibreglass volume 1,00 m³ 494,200.00 494,200.00
12.0000 % Perlengkapan (dari harga bak) - 59,304.00
3.0000 Oh Pekerja tak terlatih 100,000.00 300,000.00
4.5000 Oh Tukang batu 100,000.00 450,000.00
0.9000 Oh Kepala tukang 85,000.00 76,500.00
0.9000 Oh Mandor 90,000.00 81,000.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI
1,461,004.00
J.8 Memasang 1 buah bak mandi batu bata vol. 0,3 m³ + porselin 11 cm x 11 cm
180.0000 bh Batu bata Kls I 3,300.00 594,000.00
120.0000 kg Semen PC @ 50 kg 86,000.00 10,320,000.00
0.3000 m³ Pasir pasang 450,000.00 135,000.00
360.0000 bh Porcelaint uk. 11 cm x 11 cm 1,600.00 576,000.00
6.0000 kg Semen putih 2,500.00 15,000.00
6.0000 Oh Pekerja tak terlatih 100,000.00 600,000.00
3.0000 Oh Tukang batu 100,000.00 300,000.00
0.3000 Oh Kepala tukang 85,000.00 25,500.00
0.3000 Oh Mandor 90,000.00 27,000.00
12,592,500.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI
J.9 Memasang 1 buah bak mandi batu bata vol. 0,3 m³ + keramik 10 cm x 20 cm
180.0000 bh Batu bata Kls I 3,300.00 594,000.00
120.0000 kg Semen PC @ 50 kg 86,000.00 10,320,000.00
0.3000 m³ Pasir pasang 450,000.00 135,000.00
4.4000 m² Keramik 10 x 20 (cm) Kwalitas Sedang 68,109.00 299,679.60
6.0000 kg Semen putih 2,500.00 15,000.00
6.0000 Oh Pekerja tak terlatih 100,000.00 600,000.00
3.0000 Oh Tukang batu 100,000.00 300,000.00
0.3000 Oh Kepala tukang 85,000.00 25,500.00
0.3000 Oh Mandor 90,000.00 27,000.00
12,316,179.60
J.10 Memasang 1 buah bak beton vol. 1 m³ air dengan keramik 10 cm x 20 cm
0.9000 m³ Beton adukan 1 pc : 1 ps : 2 krk 41,896,909.80 37,707,218.82
180.0000 kg Besi beton 27,000.00 4,860,000.00
0.8000 m³ Kayu gergajian kelas IV, papan 1,676,800.00 1,341,440.00
10.7600 m² Keramik 10 x 20 (cm) Kwalitas Sedang 68,109.00 732,852.84
10.0000 % Perlengkapan (dari harga total bahan) - 4,390,865.88
2.3000 Oh Pekerja tak terlatih 100,000.00 230,000.00
3.2000 Oh Tukang batu 100,000.00 320,000.00
0.7000 Oh Kepala tukang 85,000.00 59,500.00
0.7000 Oh Mandor 90,000.00 63,000.00
49,704,877.54
J.11 Memasang 1 buah bak beton vol. 1 m³ air dengan porselin 11 cm x 11 cm
0.9000 m³ Beton adukan 1 pc : 1 ps : 2 krk 41,896,909.80 37,707,218.82
180.0000 kg Besi beton 27,000.00 4,860,000.00
0.8000 m³ Kayu gergajian kelas IV, papan 1,676,800.00 1,341,440.00
1,115.0000 bh Porcelaint uk. 11 cm x 11 cm 1,600.00 1,784,000.00
10.0000 % Perlengkapan (dari harga total bahan) - 4,569,265.88
3.5000 Oh Pekerja tak terlatih 100,000.00 350,000.00
4.5000 Oh Tukang batu 100,000.00 450,000.00
0.9000 Oh Kepala tukang 85,000.00 76,500.00
0.9000 Oh Mandor 90,000.00 81,000.00
51,219,424.70
J.12 Memasang 1 buah bathtub (non SNI)
1.0000 bh Bak mandi jenis bathtub 1,750,000.00 1,750,000.00
20.0000 % Perlengkapan (dari harga bathtub) - 350,000.00
0.0750 Oh Tukang batu 100,000.00 7,500.00
0.0750 Oh Kepala tukang 85,000.00 6,375.00
0.2500 Oh Mandor 90,000.00 22,500.00
2,136,375.00
J.13 Memasang 1 m' pipa beton ø 15 cm - 20 cm
1.1000 bh Pipa GIP 2" 120,000.00 132,000.00
13.0000 bh Batu bata Kls II 9,000.00 117,000.00
3.9200 kg Semen PC @ 50 kg 86,000.00 337,120.00
0.0560 m³ Pasir pasang 450,000.00 25,200.00
0.0240 m³ Pasir urug / timbun 450,000.00 10,800.00
0.1400 Oh Pekerja tak terlatih 100,000.00 14,000.00
0.0700 Oh Tukang batu 100,000.00 7,000.00
0.0070 Oh Kepala tukang 85,000.00 595.00
0.0070 Oh Mandor 90,000.00 630.00
644,345.00
J.14 Memasang 1 m' pipa beton ø 30 cm - 100 cm
1.1000 bh Pipa Galvanis Medium B Dia 2" 652,000.00 717,200.00
25.0000 bh Batu bata Kls I 3,300.00 82,500.00
10.3000 kg Semen PC @ 50 kg 86,000.00 885,800.00
0.0610 m³ Pasir pasang 450,000.00 27,450.00
0.0690 m³ Pasir urug / timbun 450,000.00 31,050.00
0.3800 Oh Pekerja tak terlatih 100,000.00 38,000.00
0.1900 Oh Tukang batu 100,000.00 19,000.00
0.0190 Oh Kepala tukang 85,000.00 1,615.00
0.0190 Oh Mandor 90,000.00 1,710.00
1,804,325.00
J.15 Memasang 1 bh bak kontrol pas. batu bata uk. 30 cm x 30 cm, tinggi 35 cm
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI
66.0000 bh Batu bata Kls I 3,300.00 217,800.00
44.0000 kg Semen PC @ 50 kg 86,000.00 3,784,000.00
0.0700 m³ Pasir pasang 450,000.00 31,500.00
0.0700 m³ Batu kerikil ayak / batu saring / kerai 720,000.00 50,400.00
1.6000 kg Besi beton 27,000.00 43,200.00
0.0600 m³ Pasir ayak untuk beton 450,000.00 27,000.00
3.2000 Oh Pekerja tak terlatih 100,000.00 320,000.00
1.1050 Oh Tukang batu 100,000.00 110,500.00
0.0015 Oh Kepala tukang 85,000.00 127.50
0.0160 Oh Mandor 90,000.00 1,440.00
4,585,967.50
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI
J.16 Memasang 1 bh bak kontrol pas. batu bata uk. 45 cm x 45 cm, tinggi 50 cm
113.0000 bh Batu bata merah (lokal) 3,300.00 372,900.00
77.0000 kg Semen PC @ 50 kg 86,000.00 6,622,000.00
0.1300 m³ Pasir pasang 450,000.00 58,500.00
0.0200 m³ Batu kerikil ayak / batu saring / kerai 720,000.00 14,400.00
2.6000 kg Besi beton 27,000.00 70,200.00
0.0900 m³ Pasir ayak untuk beton 450,000.00 40,500.00
1.4200 Oh Pekerja tak terlatih 100,000.00 142,000.00
0.4730 Oh Tukang batu 100,000.00 47,300.00
0.0470 Oh Kepala tukang 85,000.00 3,995.00
0.0710 Oh Mandor 90,000.00 6,390.00
7,378,185.00
J.17 Memasang 1 bh bak kontrol pas. batu bata uk. 60 cm x 60 cm, tinggi 65 cm
167.0000 bh Batu bata Kls I 3,300.00 551,100.00
114.0000 kg Semen PC @ 50 kg 86,000.00 9,804,000.00
0.1840 m³ Pasir pasang 450,000.00 82,800.00
0.0330 m³ Batu kerikil ayak / batu saring / kerai 720,000.00 23,760.00
4.8500 kg Besi beton 27,000.00 130,950.00
0.1200 m³ Pasir ayak untuk beton 450,000.00 54,000.00
2.1600 Oh Pekerja tak terlatih 100,000.00 216,000.00
0.7200 Oh Tukang batu 100,000.00 72,000.00
0.0720 Oh Kepala tukang 85,000.00 6,120.00
0.1080 Oh Mandor 90,000.00 9,720.00
10,950,450.00
J.18 Memasang 1 m' pipa galvanis ø 1/2"
1.2000 m' Pipa Galvanis Medium B Dia 1" 310,000.00 372,000.00
35.0000 % Perlengkapan (dari harga pipa) - 130,200.00
0.0540 Oh Pekerja tak terlatih 100,000.00 5,400.00
0.0900 Oh Tukang batu 100,000.00 9,000.00
0.0090 Oh Kepala tukang 85,000.00 765.00
0.0270 Oh Mandor 90,000.00 2,430.00
519,795.00
J.19 Memasang 1 m' pipa galvanis ø 3/4"
1.2000 m' Pipa Galvanis Medium B Dia 1" 310,000.00 372,000.00
35.0000 % Perlengkapan (dari harga pipa) - 130,200.00
0.0540 Oh Pekerja tak terlatih 100,000.00 5,400.00
0.0900 Oh Tukang batu 100,000.00 9,000.00
0.0090 Oh Kepala tukang 85,000.00 765.00
0.0270 Oh Mandor 90,000.00 2,430.00
519,795.00
J.20 Memasang 1 m' pipa galvanis ø 1"
1.2000 m' Pipa Galvanis Medium B Dia 1" 310,000.00 372,000.00
35.0000 % Perlengkapan (dari harga pipa) - 130,200.00
0.0540 Oh Pekerja tak terlatih 100,000.00 5,400.00
0.0900 Oh Tukang batu 100,000.00 9,000.00
0.0090 Oh Kepala tukang 85,000.00 765.00
0.0270 Oh Mandor 90,000.00 2,430.00
519,795.00
J.21 Memasang 1 m' pipa galvanis ø 1,5"
1.2000 m' Pipa Galvanis Medium B Dia 1" 310,000.00 372,000.00
35.0000 % Perlengkapan (dari harga pipa) - 130,200.00
0.1080 Oh Pekerja tak terlatih 100,000.00 10,800.00
0.1800 Oh Tukang batu 100,000.00 18,000.00
0.0180 Oh Kepala tukang 85,000.00 1,530.00
0.0054 Oh Mandor 90,000.00 486.00
533,016.00
J.22 Memasang 1 m' pipa galvanis ø 2"
1.2000 m' Pipa Galvanis Medium B Dia 1" 310,000.00 372,000.00
35.0000 % Perlengkapan (dari harga pipa) - 130,200.00
0.1080 Oh Pekerja tak terlatih 100,000.00 10,800.00
0.1800 Oh Tukang batu 100,000.00 18,000.00
0.0180 Oh Kepala tukang 85,000.00 1,530.00
0.0054 Oh Mandor 90,000.00 486.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI
533,016.00
J.23 Memasang 1 m' pipa galvanis ø 4"
1.2000 m' Pipa Galvanis Medium B Dia 1" 310,000.00 372,000.00
35.0000 % Perlengkapan (dari harga pipa) - 130,200.00
0.1350 Oh Pekerja tak terlatih 100,000.00 13,500.00
0.2250 Oh Tukang batu 100,000.00 22,500.00
0.0225 Oh Kepala tukang 85,000.00 1,912.50
0.0068 Oh Mandor 90,000.00 612.00
540,724.50
J.24 Memasang 1 m' pipa PVC tipe AW ø 1/2"
1.2000 m' Pipa PVC 1/2" panjang 4 m 32,000.00 38,400.00
35.0000 % Perlengkapan (dari harga pipa) - 13,440.00
0.0360 Oh Pekerja tak terlatih 100,000.00 3,600.00
0.0600 Oh Tukang batu 100,000.00 6,000.00
0.0060 Oh Kepala tukang 85,000.00 510.00
0.0018 Oh Mandor 90,000.00 162.00
62,112.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI
J.25 Memasang 1 m' pipa PVC tipe AW ø 3/4"
1.2000 m' Pipa PVC 3/4" panjang 4 m 38,000.00 45,600.00
35.0000 % Perlengkapan (dari harga pipa) - 15,960.00
0.0360 Oh Pekerja tak terlatih 100,000.00 3,600.00
0.0600 Oh Tukang batu 100,000.00 6,000.00
0.0060 Oh Kepala tukang 85,000.00 510.00
0.0018 Oh Mandor 90,000.00 162.00
71,832.00
J.26 Memasang 1 m' pipa PVC tipe AW ø 1"
1.2000 m' Pipa PVC 1" panjang 4 m 45,000.00 54,000.00
35.0000 % Perlengkapan (dari harga pipa) - 18,900.00
0.0360 Oh Pekerja tak terlatih 100,000.00 3,600.00
0.0600 Oh Tukang batu 100,000.00 6,000.00
0.0060 Oh Kepala tukang 85,000.00 510.00
0.0018 Oh Mandor 90,000.00 162.00
83,172.00
J.27 Memasang 1 m' pipa PVC tipe AW ø 1,5"
1.2000 m' Pipa PVC 2" 74,000.00 88,800.00
35.0000 % Perlengkapan (dari harga pipa) - 31,080.00
0.0360 Oh Pekerja tak terlatih 100,000.00 3,600.00
0.0600 Oh Tukang batu 100,000.00 6,000.00
0.0060 Oh Kepala tukang 85,000.00 510.00
0.0018 Oh Mandor 90,000.00 162.00
130,152.00
J.28 Memasang 1 m' pipa PVC type AW ø 3"
1.2000 m' Pipa PVC 3" 69,600.00 83,520.00
35.0000 % Perlengkapan (dari harga pipa) - 29,232.00
0.0810 Oh Pekerja tak terlatih 100,000.00 8,100.00
0.1350 Oh Tukang batu 100,000.00 13,500.00
0.1350 Oh Kepala tukang 85,000.00 11,475.00
0.0041 Oh Mandor 90,000.00 369.00
146,196.00
J.29 Memasang 1 m' pipa PVC type AW ø 4" - 6"
1.2000 m' Pipa GIP 4" 251,554.00 301,864.80
35.0000 % Perlengkapan (dari harga pipa) - 105,652.68
0.0810 Oh Pekerja tak terlatih 100,000.00 8,100.00
0.1350 Oh Tukang batu 100,000.00 13,500.00
0.1350 Oh Kepala tukang 85,000.00 11,475.00
0.0041 Oh Mandor 90,000.00 369.00
440,961.48
J.30 Memasang 1 bh kran air ø 3/4" atau 1/2"
1.0000 bh Kran air ø 0,75 (inch) 39,700.00 39,700.00
0.0250 bh seal tape - 9.93
0.0100 Oh Pekerja tak terlatih 100,000.00 1,000.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0050 Oh mandor 90,000.00 450.00
52,009.93
J.31 Memasang 1 bh floor drain
1.0000 bh Floor drain 28,500.00 28,500.00
0.0100 Oh Pekerja tak terlatih 100,000.00 1,000.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0050 Oh Mandor 90,000.00 450.00
40,800.00
J.32 Memasang 1 bh tempat sabun keramik (non SNI)
1.0000 bh Tempat sabun keramik 76,500.00 76,500.00
0.0020 kg Semen putih 2,500.00 5.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
87,355.00
J.33 Memasang 1 bh septic tank, volume air 1 m³ (non SNI)
3.7170 m³ Galian tanah 43,600.00 162,061.20
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI
2.0380 m³ Urugan kembali 20,910.00 42,614.58
0.3600 m³ Pas. dinding bata merah tebal 1/2 bata ad. 1 : 4 1,283,550.00 462,078.00
3.5672 m² Pas. plesteran dinding dalam bak ad. 1 : 2, tebal 15 mm 777,545.00 2,773,658.52
0.0560 m³ Pas. kolom beton bertulang ad. 1 : 2 : 3 73,764,138.45 4,130,791.75
0.1300 m³ Pas. sloof beton bertulang ad. 1 : 2 : 3 33,774,994.42 4,390,749.27
0.0200 m³ Pas. ringbalk beton bertulang ad. 1 : 2 : 3 63,635,738.67 1,272,714.77
2.6000 m² Pas. lantai bak beton tumbuk ad. 1 : 3 : 6 17,781,013.80 46,230,635.88
0.6000 m' Pas. pipa galvanis ø 1,5" 533,016.00 319,809.60
59,785,113.59
J.34 Memasang 1 bh septic tank, volume air 1,5 m³ (non SNI)
5.5800 m³ Galian tanah 43,600.00 243,288.00
3.0500 m³ Urugan kembali 20,910.00 63,775.50
0.5400 m³ Pas. dinding bata merah tebal 1/2 bata ad. 1 : 4 1,283,550.00 693,117.00
5.3508 m² Pas. plesteran dinding dalam bak ad. 1 : 2, tebal 15 mm 777,545.00 4,160,487.79
0.0840 m³ Pas. kolom beton bertulang ad. 1 : 2 : 3 73,764,138.45 6,196,187.63
0.2000 m³ Pas. sloof beton bertulang ad. 1 : 2 : 3 33,774,994.42 6,754,998.88
0.0300 m³ Pas. ringbalk beton bertulang ad. 1 : 2 : 3 63,635,738.67 1,909,072.16
3.9000 m² Pas. lantai bak beton tumbuk ad. 1 : 3 : 6 17,781,013.80 69,345,953.82
0.6000 m' Pas. pipa galvanis ø 1,5" 533,016.00 319,809.60
89,686,690.38
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI
J.35 Memasang 1 bh septic tank, volume air 2 m³ (non SNI)
7.4340 m³ Galian tanah 43,600.00 324,122.40
4.0760 m³ Urugan kembali 20,910.00 85,229.16
0.7200 m³ Pas. dinding bata merah tebal 1/2 bata ad. 1 : 4 1,283,550.00 924,156.00
7.1344 m² Pas. plesteran dinding dalam bak ad. 1 : 2, tebal 15 mm 777,545.00 5,547,317.05
0.1120 m³ Pas. kolom beton bertulang ad. 1 : 2 : 3 73,764,138.45 8,261,583.51
0.2600 m³ Pas. sloof beton bertulang ad. 1 : 2 : 3 33,774,994.42 8,781,498.55
0.0400 m³ Pas. ringbalk beton bertulang ad. 1 : 2 : 3 63,635,738.67 2,545,429.55
5.2000 m² Pas. lantai bak beton tumbuk ad. 1 : 3 : 6 17,781,013.80 92,461,271.76
0.6000 m' Pas. pipa galvanis ø 1,5" 533,016.00 319,809.60
119,250,417.57

J.36 Memasang 1 bh Peresapan, dalam 5 m'


5.0000 m³ Galian Tanah 43,600.00 218,000.00
2.4880 m³ Urugan Kembali 20,910.00 52,024.08
2.5120 m³ Pas.Buis Beton tak bertulang ø 80 cm 69,700.00 175,086.40
0.3840 m² Pas. Plesteran dinding(dalam) pd pertemuan buis , ad. 1 : 2, tebal 15mm 777,545.00 298,577.28
0.6000 m' Pas. Pipa galvanis ø 1,5" 533,016.00 319,809.60
1,063,497.36
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
K. ANALISA BIAYA PEKERJAAN CAT DAN TALANG

K.1 1 m² Mengecat tembok baru (1 lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup)
0.1000 kg Cat dasar 32,700.00 3,270.00
0.2600 kg Cat tembok 24,680.00 6,416.80
0.0250 kg Plamuer 19,400.00 485.00
0.0200 Oh Pekerja tak terlatih 100,000.00 2,000.00
0.0630 Oh Tukang cat 100,000.00 6,300.00
0.0063 Oh Kepala tukang 85,000.00 535.50
0.0025 Oh Mandor 90,000.00 225.00
19,232.30
K.2 1 m² Mengecat bidang kayu baru (1lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup)
0.2000 kg Cat menie 18,405.00 3,681.00
0.1500 kg Plamuer 19,400.00 2,910.00
0.1700 kg Cat dasar 32,700.00 5,559.00
0.2600 kg Cat minyak 59,062.50 15,356.25
0.0700 Oh Pekerja tak terlatih 100,000.00 7,000.00
0.0090 Oh Tukang cat 100,000.00 900.00
0.0060 Oh Kepala tukang 85,000.00 510.00
0.0025 Oh Mandor 90,000.00 225.00
36,141.25
K.3 1 m² Mengecat Genteng
0.3000 ltr Cat genteng 30,693.60 9,208.08
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.1500 Oh Tukang cat 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0050 Oh Mandor 90,000.00 450.00
35,933.08
K.4 1 m² Mengeter 1X rangka kayu
0.3500 kg Ter 76,500.00 26,775.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.0030 Oh Mandor 90,000.00 270.00
37,045.00
K.5 1 m² Mengeter rangka kayu
0.3500 kg Ter 76,500.00 26,775.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.0060 Oh Mandor 90,000.00 540.00
37,315.00
K.6 1 m² Mengapur dinding baru
0.1500 kg Kapur sirih 37,100.00 5,565.00
0.1000 lbr Amplas 11,600.00 1,160.00
0.2500 ikat Alang-alang 1,500.00 375.00
0.0020 M³ Kayu untuk perancah 1,209,000.00 2,418.00
0.0600 Oh Pekerja tak terlatih 100,000.00 6,000.00
0.0100 Oh Tukang cat 100,000.00 1,000.00
0.0010 Oh Kepala tukang 85,000.00 85.00
0.0025 Oh Mandor 90,000.00 225.00
16,828.00
K.7 1 m² Memeni besi 2X
0.1000 kg Cat menie 18,405.00 1,840.50
0.0100 bh Kuas uk. 3" 13,200.00 132.00
0.0200 Oh Pekerja tak terlatih 100,000.00 2,000.00
0.2000 Oh Tukang cat 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0100 Oh Mandor 90,000.00 900.00
26,572.50
K.8 1 m' Pasang talang datar, seng BJLS 27
0.5000 lbr Seng plat BJLS 27 uk. 30" 53,900.00 26,950.00
0.0150 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 562.50
0.0096 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 24,000.00
0.0250 kg Cat menie 18,405.00 460.13
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.4000 Oh Tukang kayu 100,000.00 40,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0013 Oh Mandor 90,000.00 112.50
109,210.13
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
K. ANALISA BIAYA PEKERJAAN CAT DAN TALANG
K.9 1 m' Pasang talang miring, seng BJLS 27
0.5000 lbr Seng plat BJLS 27 uk. 30" 53,900.00 26,950.00
0.0150 kg Paku berbagai ukuran (2" - 5") 45,000.00 675.00
0.0019 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 4,750.00
0.3000 kg Cat menie 18,405.00 5,521.50
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.4000 Oh Tukang kayu 100,000.00 40,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0013 Oh Mandor 90,000.00 112.50
95,134.00
K.10 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng BJLS 27
0.3000 lbr Seng plat BJLS 27 uk. 30" 53,900.00 16,170.00
0.1000 kg Paku berbagai ukuran (2" - 5") 45,000.00 4,500.00
0.5000 m³ Besi strip 53,550.00 26,775.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.2500 Oh Tukang kayu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
89,570.00
K.11 1 m² Mengecat bidang kayu lama
0.1500 kg Plamuer 19,400.00 2,910.00
0.1700 kg Cat dasar 32,700.00 5,559.00
0.1700 kg Cat Minyak 59,062.50 10,040.63
0.0700 Oh Pekerja tak terlatih 100,000.00 7,000.00
0.0750 Oh Tukang cat 100,000.00 7,500.00
0.0075 Oh Kepala tukang 85,000.00 637.50
0.0025 Oh Mandor 90,000.00 225.00
33,872.13
K.12 1 m² Mengecat tembok lama ( 1 lapis cat dasar , 2 lapis cat penutup)
0.1200 kg Cat dasar 32,700.00 3,924.00
0.1800 kg Cat tembok 24,680.00 4,442.40
0.0280 Oh Pekerja tak terlatih 100,000.00 2,800.00
0.0420 Oh Tukang cat 100,000.00 4,200.00
0.0042 Oh Kepala tukang 85,000.00 357.00
0.0025 Oh Mandor 90,000.00 225.00
15,948.40
K.13 1 m² Mengikis /mengerok permukaan cat tembok lama
0.0500 kg Soda api 76,500.00 3,825.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.0025 Oh Mandor 90,000.00 225.00
19,050.00
K.14 1 m² Mendempul dan menggosok kayu
0.0800 kg Dempul jadi 146,500.00 11,720.00
0.0200 kg Minyak pelarut cat (solvent) 28,900.00 578.00
0.0100 kg Batu apung 270,000.00 2,700.00
0.0400 Oh Pekerja tak terlatih 100,000.00 4,000.00
0.0400 Oh Tukang cat 100,000.00 4,000.00
0.0040 Oh Kepala tukang 85,000.00 340.00
0.0025 Oh Mandor 90,000.00 225.00
11,843.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
K. ANALISA BIAYA PEKERJAAN CAT DAN TALANG
K.15 1 m² Mengerok karat cat lama permukaan baja/besi dengan cara manual
0.0500 kg Sabun/deterjen 14,500.00 725.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.0025 Oh Mandor 90,000.00 225.00
15,950.00
K.16 1 m² Menyabun permukaan tembok lama
0.0500 kg Sabun/deterjen 14,500.00 725.00
0.1500 Oh Pekerja tak terlatih 100,000.00 15,000.00
0.0025 Oh Mandor 90,000.00 225.00
15,950.00
K.17 1 m² Pelaburan bidang kayu dengan politur
0.1500 ltr Politur 59,700.00 8,955.00
0.3720 ltr Politur jadi 98,300.00 36,567.60
2.0000 lbr Amplas 11,600.00 23,200.00
0.0600 Oh Tukang cat 100,000.00 6,000.00
0.0160 Oh Kepala tukang 85,000.00 1,360.00
0.0025 Oh Mandor 90,000.00 225.00
76,307.60
K.18 1 m² Pelaburan bidang kayu dengan vernis
0.1500 ltr Cat Vernis 19,500.00 2,925.00
0.0500 kg Dempul kayu 40,000.00 2,000.00
0.1000 lbr Amplas 11,600.00 1,160.00
0.0100 bh Kuas uk. 3" 13,200.00 132.00
0.1600 Oh Pekerja tak terlatih 100,000.00 16,000.00
0.1600 Oh Tukang cat 100,000.00 16,000.00
0.0160 Oh Kepala tukang 85,000.00 1,360.00
0.0025 Oh Mandor 90,000.00 225.00
39,802.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK

L.1 1 m² Pasangan lantai keramik 10 cm x 20 cm


1.0000 m² Keramik 10 x 20 (cm) Kwalitas Sedang 68,109.00 68,109.00
11.3800 kg Semen PC @ 50 kg 86,000.00 978,680.00
0.0420 m³ Pasir pasang 450,000.00 18,900.00
1.5000 kg Semen warna 15,000.00 22,500.00
0.6200 Oh Pekerja tak terlatih 100,000.00 62,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
0.0300 Oh Mandor 90,000.00 2,700.00
1,190,864.00
L.2 1 m² Pasangan lantai keramik 15 cm x 15 cm
1.0000 m² Keramik 10 x 20 (cm) Kwalitas Sedang 68,109.00 68,109.00
11.3800 kg Semen PC @ 50 kg 86,000.00 978,680.00
0.0420 m³ Pasir pasang 450,000.00 18,900.00
1.5000 kg Semen warna 15,000.00 22,500.00
0.6200 Oh Pekerja tak terlatih 100,000.00 62,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
0.0300 Oh Mandor 90,000.00 2,700.00
1,190,864.00
L.3 1 m² Pasangan lantai keramik 20 cm x 20 cm
1.0000 m² Keramik 20 x 20 (cm) Kwalitas Baik 105,000.00 105,000.00
11.3800 kg Semen PC @ 50 kg 86,000.00 978,680.00
0.0420 m³ Pasir pasang 450,000.00 18,900.00
1.5000 kg Semen warna 15,000.00 22,500.00
0.6200 Oh Pekerja tak terlatih 100,000.00 62,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
0.0300 Oh Mandor 90,000.00 2,700.00
1,227,755.00
L.4 1 m² Pasangan lantai keramik 20 cm x 25 cm
1.0000 m² Keramik 20 x 25 (cm) Kwalitas Baik 115,000.00 115,000.00
11.3800 kg Semen PC @ 50 kg 86,000.00 978,680.00
0.0420 m³ Pasir pasang 450,000.00 18,900.00
1.5000 kg Semen warna 15,000.00 22,500.00
0.6200 Oh Pekerja tak terlatih 100,000.00 62,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
0.0300 Oh Mandor 90,000.00 2,700.00
1,237,755.00
L.5 1 m² Pasangan lantai keramik 10 cm x 20 cm
1.0000 m² Keramik 10 x 20 (cm) Kwalitas Sedang 68,109.00 68,109.00
11.3800 kg Semen PC @ 50 kg 86,000.00 978,680.00
0.0420 m³ Pasir pasang 450,000.00 18,900.00
1.5000 kg Semen warna 15,000.00 22,500.00
0.6200 Oh Pekerja tak terlatih 100,000.00 62,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
0.0300 Oh Mandor 90,000.00 2,700.00
1,190,864.00
L.6 1 m² Pasangan lantai keramik 30 cm x 30 cm
1.0000 m² Keramik 30 x 30 (cm) terang 84,700.00 84,700.00
11.3800 kg Semen PC @ 50 kg 86,000.00 978,680.00
0.0420 m³ Pasir pasang 450,000.00 18,900.00
1.5000 kg Semen warna 15,000.00 22,500.00
0.6200 Oh Pekerja tak terlatih 100,000.00 62,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
0.0300 Oh Mandor 90,000.00 2,700.00
1,207,455.00
L.7 1 m² Pasangan lantai keramik 40 cm x 40 cm
1.0000 m² Keramik 40 x 40 (cm) putih / berwarna 95,300.00 95,300.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK
11.3800 kg Semen PC @ 50 kg 86,000.00 978,680.00
0.0420 m³ Pasir pasang 450,000.00 18,900.00
1.5000 kg Semen warna 15,000.00 22,500.00
0.6200 Oh Pekerja tak terlatih 100,000.00 62,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
0.0300 Oh Mandor 90,000.00 2,700.00
1,218,055.00
L.8 1 m² Pasangan lantai ubin granito 40 cm x 40 cm
1.0000 m² ubin granito 40 x 40 cm -
9.8000 kg Semen PC @ 50 kg 86,000.00 842,800.00
0.0215 m³ Pasir pasang 450,000.00 9,675.00
1.3000 kg Semen warna 15,000.00 19,500.00
0.2500 Oh Pekerja tak terlatih 100,000.00 25,000.00
0.1200 Oh Tukang batu 100,000.00 12,000.00
0.0120 Oh Kepala tukang 85,000.00 1,020.00
0.0125 Oh Mandor 90,000.00 1,125.00
911,120.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK
L.9 1 m² Pasangan lantai ubin granito 30 cm x 30 cm
1.0000 m² ubin granito 30 x 30 cm -
10.0000 kg Semen PC @ 50 kg 86,000.00 860,000.00
0.0215 m³ Pasir pasang 450,000.00 9,675.00
1.5000 kg Semen warna 15,000.00 22,500.00
0.2600 Oh Pekerja tak terlatih 100,000.00 26,000.00
0.1250 Oh Tukang batu 100,000.00 12,500.00
0.0125 Oh Kepala tukang 85,000.00 1,062.50
0.0130 Oh Mandor 90,000.00 1,170.00
932,907.50
L.10 1 m' Pasangan plint ubin granito 10 cm x 40 cm
2.6500 bh plint ubin granito 10 x 40 cm 10,600.00 28,090.00
1.2000 kg Semen PC @ 50 kg 86,000.00 103,200.00
0.0030 m³ Pasir pasang 450,000.00 1,350.00
0.1000 kg Semen warna 15,000.00 1,500.00
0.0600 Oh Pekerja tak terlatih 100,000.00 6,000.00
0.0300 Oh Tukang batu 100,000.00 3,000.00
0.0030 Oh Kepala tukang 85,000.00 255.00
0.0030 Oh Mandor 90,000.00 270.00
143,665.00
L.11 1 m' Pasangan plint ubin granito 10 cm x 30 cm
3.3300 bh plint ubin granito 10 x 30 cm 8,800.00 29,304.00
1.6500 kg Semen PC @ 50 kg 86,000.00 141,900.00
0.0032 m³ Pasir pasang 450,000.00 1,440.00
0.1000 kg Semen warna 15,000.00 1,500.00
0.9000 Oh Pekerja tak terlatih 100,000.00 90,000.00
0.0900 Oh Tukang batu 100,000.00 9,000.00
0.0090 Oh Kepala tukang 85,000.00 765.00
0.0045 Oh Mandor 90,000.00 405.00
274,314.00
L.12 1 m' Pasangan plint keramik 10 cm x 20 cm
5.0000 bh Plint keramik 10 x 20 cm 2,600.00 13,000.00
1.6500 kg Semen PC @ 50 kg 86,000.00 141,900.00
0.0032 m³ Pasir pasang 450,000.00 1,440.00
0.1000 kg Semen warna 15,000.00 1,500.00
0.0900 Oh Pekerja tak terlatih 100,000.00 9,000.00
0.0900 Oh Tukang batu 100,000.00 9,000.00
0.0090 Oh Kepala tukang 85,000.00 765.00
0.0045 Oh Mandor 90,000.00 405.00
177,010.00
L.13 1 m' Pasangan plint keramik 10 cm x 15 cm
6.6700 bh Plint keramik 10 x 15 cm 1,800.00 12,006.00
1.6500 kg Semen PC @ 50 kg 86,000.00 141,900.00
0.0032 m³ Pasir pasang 450,000.00 1,440.00
0.1000 kg Semen warna 15,000.00 1,500.00
0.0900 Oh Pekerja tak terlatih 100,000.00 9,000.00
0.0900 Oh Tukang batu 100,000.00 9,000.00
0.0090 Oh Kepala tukang 85,000.00 765.00
0.0045 Oh Mandor 90,000.00 405.00
176,016.00
L.14 1 m' Pasangan plint keramik 10 cm x 20 cm
5.0000 bh Plint keramik 10 x 20 cm 2,600.00 13,000.00
1.6500 kg Semen PC @ 50 kg 86,000.00 141,900.00
0.0032 m³ Pasir pasang 450,000.00 1,440.00
0.1000 kg Semen warna 15,000.00 1,500.00
0.0900 Oh Pekerja tak terlatih 100,000.00 9,000.00
0.0900 Oh Tukang batu 100,000.00 9,000.00
0.0090 Oh Kepala tukang 85,000.00 765.00
0.0045 Oh Mandor 90,000.00 405.00
177,010.00
L.15 1 m' Pasangan plint keramik 10 cm x 40 cm
2.5000 bh Plint keramik 10 x 40 cm 3,500.00 8,750.00
1.6500 kg Semen PC @ 50 kg 86,000.00 141,900.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK
0.0032 m³ Pasir pasang 450,000.00 1,440.00
0.1000 kg Semen warna 15,000.00 1,500.00
0.0900 Oh Pekerja tak terlatih 100,000.00 9,000.00
0.0900 Oh Tukang batu 100,000.00 9,000.00
0.0090 Oh Kepala tukang 85,000.00 765.00
0.0045 Oh Mandor 90,000.00 405.00
172,760.00
L.16 1 m² Pasangan dinding dengan keramik 10 cm x 20 cm
1.0000 m² Keramik 10 x 20 (cm) Kwalitas Baik 108,000.00 108,000.00
9.3000 kg Semen PC @ 50 kg 86,000.00 799,800.00
0.0180 m³ Pasir pasang 450,000.00 8,100.00
1.5000 kg Semen warna 15,000.00 22,500.00
0.6000 Oh Pekerja tak terlatih 100,000.00 60,000.00
0.4500 Oh Tukang batu 100,000.00 45,000.00
0.0450 Oh Kepala tukang 85,000.00 3,825.00
0.0300 Oh Mandor 90,000.00 2,700.00
1,049,925.00
L.17 1 m² Pasangan dinding keramik 20 cm x 25 cm
1.0000 m² Keramik 20 x 25 (cm) Kwalitas Baik 115,000.00 115,000.00
9.3000 m³ Semen PC @ 50 kg 86,000.00 799,800.00
0.0180 m³ Pasir pasang 450,000.00 8,100.00
1.5000 kg Semen warna 15,000.00 22,500.00
0.6000 Oh Pekerja tak terlatih 100,000.00 60,000.00
0.4000 Oh Tukang batu 100,000.00 40,000.00
0.0400 Oh Kepala tukang 85,000.00 3,400.00
0.0300 Oh Mandor 90,000.00 2,700.00
1,051,500.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK
L.18 1 m² Pasangan dinding keramik 20 cm x 20 cm
1.0000 m² Keramik 20 x 20 (cm) Kwalitas Baik 105,000.00 105,000.00
9.3000 m³ Semen PC @ 50 kg 86,000.00 799,800.00
0.0180 m³ Pasir pasang 450,000.00 8,100.00
1.5000 kg Semen warna 15,000.00 22,500.00
0.6000 Oh Pekerja tak terlatih 100,000.00 60,000.00
0.1000 Oh Tukang batu 100,000.00 10,000.00
0.0450 Oh Kepala tukang 85,000.00 3,825.00
0.0300 Oh Mandor 90,000.00 2,700.00
1,011,925.00
L.19 1 m² Pasangan dinding batu paras
1.0500 m² Batu teraso 185,300.00 194,565.00
11.7500 m³ Semen PC @ 50 kg 86,000.00 1,010,500.00
0.0350 m³ Pasir pasang 450,000.00 15,750.00
0.6200 Oh Pekerja tak terlatih 100,000.00 62,000.00
0.3500 Oh Tukang batu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
0.0300 Oh Mandor 90,000.00 2,700.00
1,323,490.00
L.20 1 m² Pasangan dinding batu tempel hitam
1.0500 m² Batu alam tempel 441,300.00 463,365.00
11.7500 m³ Semen PC @ 50 kg 86,000.00 1,010,500.00
0.0350 m³ Pasir pasang 450,000.00 15,750.00
0.6200 kg Semen warna 15,000.00 9,300.00
0.3500 Oh Pekerja tak terlatih 100,000.00 35,000.00
0.0350 Oh Tukang batu 100,000.00 3,500.00
0.0300 Oh Kepala tukang 85,000.00 2,550.00
1,539,965.00
L.21 1 m² Pasangan plint kayu 10 x 20 cm
0.0024 m³ Kayu gergajian kelas II, Papan 3/25x3 2,500,000.00 6,000.00
0.0500 kg Paku sekrup 1,800.00 90.00
0.1200 Oh Pekerja tak terlatih 100,000.00 12,000.00
0.1200 Oh Tukang kayu 100,000.00 12,000.00
0.0120 Oh Kepala tukang 85,000.00 1,020.00
0.0060 Oh Mandor 90,000.00 540.00
31,650.00
L.22 1 m² Pasangan lantai dari conblock, tebal 6 cm
1.0000 m² Conblock tebal 6 cm 2,016.00 2,016.00
0.0500 Oh Pekerja tak terlatih 100,000.00 5,000.00
0.1600 Oh Tukang batu 100,000.00 16,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.2500 Oh Mandor 90,000.00 22,500.00
46,366.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA

M.1 1 kg Pasang rangka atap baja


1.1000 kg Besi baja profil IWF 11,500.00 12,650.00
0.0800 kg Cat menie 18,405.00 1,472.40
0.0600 Oh Pekerja tak terlatih 100,000.00 6,000.00
0.0060 Oh Tukang besi / tukang las 100,000.00 600.00
0.0060 Oh Kepala tukang 85,000.00 510.00
0.0003 Oh Mandor 90,000.00 27.00
21,259.40
M.2 1 m² Pasang pintu besi
1.0000 m² Pintu besi 529,500.00 529,500.00
0.6500 Oh Pekerja tak terlatih 100,000.00 65,000.00
0.6500 Oh Tukang besi / tukang las 100,000.00 65,000.00
0.0650 Oh Kepala tukang 85,000.00 5,525.00
0.0320 Oh Mandor 90,000.00 2,880.00
665,025.00
M.3 1 m² Pasang jendela besi
1.0000 m² Jendela besi 402,400.00 402,400.00
1.0500 Oh Pekerja tak terlatih 100,000.00 105,000.00
1.0500 Oh Tukang besi / tukang las 100,000.00 105,000.00
0.1050 Oh Kepala tukang 85,000.00 8,925.00
0.0053 Oh Mandor 90,000.00 472.50
621,325.00
M.4 1 m² Pasang pintu besi lipat
1.0000 m² Pintu besi lipat 882,500.00 882,500.00
1.0500 Oh Pekerja tak terlatih 100,000.00 105,000.00
1.0500 Oh Tukang besi / tukang las 100,000.00 105,000.00
0.1050 Oh Kepala tukang 85,000.00 8,925.00
0.0052 Oh Mandor 90,000.00 468.00
1,101,425.00
M.5 1 m² Pasang pintu sunscreen alumunium
1.0000 m² Sunscreen alumunium 76,500.00 76,500.00
0.0800 Oh Pekerja tak terlatih 100,000.00 8,000.00
0.8000 Oh Tukang besi / tukang las 100,000.00 80,000.00
0.0800 Oh Kepala tukang 85,000.00 6,800.00
0.0040 Oh Mandor 90,000.00 360.00
171,300.00
M.6 1 m² Pasang rolling door
1.0000 m² Rolling dor - alumunium tipis 414,800.00 414,800.00
1.0500 Oh Pekerja tak terlatih 100,000.00 105,000.00
1.5000 Oh Tukang besi / tukang las 100,000.00 150,000.00
0.1050 Oh Kepala tukang 85,000.00 8,925.00
0.0052 Oh Mandor 90,000.00 468.00
678,725.00
M.7 1 m² Pasang kusen pintu / jendela alumunium biasa
1.0000 m² Kusen pintu / jendela alumunium 3" 612,100.00 612,100.00
1.0500 Oh Pekerja tak terlatih 100,000.00 105,000.00
1.0500 Oh Tukang besi / tukang las 100,000.00 105,000.00
0.1050 Oh Kepala tukang 85,000.00 8,925.00
831,025.00
M.8 1 m² Pasang pintu alumunium biasa
1.0000 m² Pintu alumunium - swing + door closer 2,356,300.00 2,356,300.00
1.0500 Oh Pekerja tak terlatih 100,000.00 105,000.00
1.0500 Oh Tukang besi / tukang las 100,000.00 105,000.00
0.1050 Oh Kepala tukang 85,000.00 8,925.00
0.0052 Oh Mandor 90,000.00 468.00
2,575,225.00
M.9 1 m² Pasang daun pintu alumunium dengan kaca rayband 12 mm
1.0000 m² Pintu alumunium - swing + door closer 2,356,300.00 2,356,300.00
1.1000 m² Kaca gelap (ray band) tebal 12 mm 529,500.00 582,450.00
1.0500 Oh Pekerja tak terlatih 100,000.00 105,000.00
1.0500 Oh Tukang besi / tukang las 100,000.00 105,000.00
0.1050 Oh Kepala tukang 85,000.00 8,925.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA
3,157,675.00
M.10 1 m² Pasang venetion blinds
1.0000 m² Venetion blinds - -
0.3500 Oh Pekerja tak terlatih 100,000.00 35,000.00
0.3500 Oh Tukang kayu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
0.0018 Oh Mandor 90,000.00 157.50
72,975.00
M.11 1 m² Pasang vertical blinds
1.0000 m² Vertical blinds 5,250.00 5,250.00
0.3500 Oh Pekerja tak terlatih 100,000.00 35,000.00
0.3500 Oh Tukang kayu 100,000.00 35,000.00
0.0350 Oh Kepala tukang 85,000.00 2,975.00
0.0018 Oh Mandor 90,000.00 157.50
78,225.00

M.12 1 m² Pasang teralis besi


11.5000 m' Besi strip 2 x 3 29,100.00 334,650.00
1.2000 Oh Pekerja tak terlatih 100,000.00 120,000.00
1.2000 Oh Tukang besi / tukang las 100,000.00 120,000.00
0.0120 Oh Kepala tukang 85,000.00 1,020.00
0.0006 Oh Mandor 90,000.00 54.00
575,670.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA
M.13 1 m² Pasang kawat harmonika, dengan rangka kayu kelas III
1.1000 m' Kawat harmonika 109,400.00 120,340.00
0.0200 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 750.00
0.0018 m³ Kayu gergajian kelas III, papan 1,750,000.00 3,150.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0010 Oh Kepala tukang 85,000.00 85.00
0.0005 Oh Mandor 90,000.00 45.00
144,325.00
M.14 1 m² Pasang kawat nyamuk, dengan rangka kayu kelas III
1.1000 m² Kawat nyamuk plastik 24,700.00 27,170.00
0.0200 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 750.00
0.0018 m³ Kayu gergajian kelas III, papan 1,750,000.00 3,150.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0010 Oh Kepala tukang 85,000.00 85.00
0.0005 Oh Mandor 90,000.00 45.00
51,200.00
M.15 1 m² Pasang kawat kassa, dengan rangka kayu kelas III
1.1000 m² Kawat kassa / kawat loket 19,400.00 21,340.00
0.0200 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 750.00
0.0018 m³ Kayu gergajian kelas III, papan 1,750,000.00 3,150.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0010 Oh Kepala tukang 85,000.00 85.00
0.0005 Oh Mandor 90,000.00 45.00
45,325.00
M.16 1 m² Pasang kawat burung, dengan rangka kayu kelas III
1.1000 m² Kawat burung 22,900.00 25,190.00
0.0200 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 750.00
0.0018 m³ Kayu gergajian kelas III, papan 1,750,000.00 3,150.00
0.1000 Oh Pekerja tak terlatih 100,000.00 10,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0010 Oh Kepala tukang 85,000.00 85.00
0.0005 Oh Mandor 90,000.00 45.00
49,175.00
M.17 1 m² Pasang kaca rayband tebal 10 mm
1.1000 m² Kaca gelap (ray band) tebal 10 mm 441,300.00 485,430.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
503,205.00
M.18 1 m² Pasang jendela nako (dengan kaca dan teralis besi)
1.1000 m² Jendela nako (kerangka + kaca 5 mm) 238,300.00 262,130.00
0.0200 kg Paku berbagai ukuran (1/2" - 1") 37,500.00 750.00
0.0250 m² Besi strip 53,550.00 1,338.75
0.2000 Oh Pekerja tak terlatih 100,000.00 20,000.00
0.2000 Oh Tukang kayu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0010 Oh Mandor 90,000.00 90.00
305,918.75
M.19 1 m² Pasang kaca bening tebal 3 mm
1.1000 m² Kaca bening tebal 3 mm 240,000.00 264,000.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
281,842.50

M.20 1 m² Pasang kaca bening tebal 5 mm


1.1000 m² Kaca bening tebal 5 mm 272,000.00 299,200.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
316,975.00
M.21 1 m² Pasang kaca bening tebal 8 mm
1.1000 m² Kaca bening tebal 8 mm - -
0.0165 Oh Pekerja tak terlatih 100,000.00 1,650.00
0.1650 Oh Tukang kayu 100,000.00 16,500.00
0.0165 Oh Kepala tukang 85,000.00 1,402.50
0.0008 Oh Mandor 90,000.00 72.00
19,552.50
M.22 1 m² Pasang kaca buram, tebal 12 mm
1.1000 m² Kaca buram tebal 12 mm 432,400.00 475,640.00
0.0500 kg Sealent 61,800.00 3,090.00
0.0250 Oh Pekerja tak terlatih 100,000.00 2,500.00
0.2500 Oh Tukang kayu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0013 Oh Mandor 90,000.00 112.50
508,355.00
M.23 1 m² Pasang kaca cermin tebal 5 mm
1.1000 m² Kaca cermin tebal 5 mm 165,000.00 181,500.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
199,275.00
KODE HARGA SATUAN (Rp.)
URAIAN PEKERJAAN JUMLAH (Rp.)
ANALISA BAHAN UPAH
1 2 3 4 5
M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA
M.24 1 m² Pasang kaca cermin tebal 6 mm
1.1000 m² Kaca cermin tebal 6 mm 197,700.00 217,470.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
235,312.50
M.25 1 m² Pasang kaca cermin tebal 8 mm
1.1000 m² Kaca cermin tebal 8 mm 263,900.00 290,290.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
308,132.50
M.26 1 m² Pasang kaca wireglass tebal 5 mm
1.1000 m² Kaca wireglass tebal 5 mm 874,600.00 962,060.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
979,902.50
M.27 1 m² Pasang kaca patri tebal 5 mm
1.1000 m² Kaca patri tebal 5 mm 2,137,800.00 2,351,580.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
2,369,422.50
KODE HARGA SATUAN (Rp.) JUMLAH (Rp.)
URAIAN PEKERJAAN
ANALISA BAHAN UPAH
1 2 3 4 5
N. ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI, ENGSEL DAN KAIT

N.1 1 Buah pasang kunci tanam antik


1.0000 bh Kunci tanam antik 150,000.00 150,000.00
0.0600 Oh Pekerja tak terlatih 100,000.00 6,000.00
0.6000 Oh Tukang kayu 100,000.00 60,000.00
0.0600 Oh Kepala tukang 85,000.00 5,100.00
0.0030 Oh Mandor 90,000.00 270.00
221,370.00
N.2 1 Buah pasang kunci tanam
1.0000 bh Kunci tanam 132,400.00 132,400.00
0.0100 Oh Pekerja tak terlatih 100,000.00 1,000.00
0.5000 Oh Tukang kayu 100,000.00 50,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0050 Oh Mandor 90,000.00 450.00
184,700.00
N.3 1 Buah pasang kunci tanam kamar mandi
1.0000 bh Kunci tanam kamar mandi 63,500.00 63,500.00
0.0050 Oh Pekerja tak terlatih 100,000.00 500.00
0.5000 Oh Tukang kayu 100,000.00 50,000.00
0.0050 Oh Kepala tukang 85,000.00 425.00
0.0025 Oh Mandor 90,000.00 225.00
114,650.00
N.4 1 Buah pasang kunci silinder
1.0000 bh Kunci silinder 184,400.00 184,400.00
0.0050 Oh Pekerja tak terlatih 100,000.00 500.00
0.5000 Oh Tukang kayu 100,000.00 50,000.00
0.0050 Oh Kepala tukang 85,000.00 425.00
0.0003 Oh Mandor 90,000.00 22.50
235,347.50
N.5 1 Buah pasang engsel pintu/jendela 3"
1.0000 bh Engsel pintu / jendela 3" 15,000.00 15,000.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
32,842.50
N.6 1 Buah pasang engsel pintu/jendela 4"
1.0000 bh Engsel pintu / jendela 4" 20,300.00 20,300.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
38,142.50
N.7 1 Buah pasang engsel pintu/jendela 5"
1.0000 bh Engsel pintu / jendela 5" 28,200.00 28,200.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
46,042.50
N.8 1 Buah pasang kait angin biasa
1.0000 bh Kait angin (biasa) 29,000.00 29,000.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
46,842.50
KODE HARGA SATUAN (Rp.) JUMLAH (Rp.)
URAIAN PEKERJAAN
ANALISA BAHAN UPAH
1 2 3 4 5
N.9 1 Buah pasang kait angin istimewa
1.0000 bh Kait angin (istimewa) 16,800.00 16,800.00
0.0150 Oh Pekerja tak terlatih 100,000.00 1,500.00
0.1500 Oh Tukang kayu 100,000.00 15,000.00
0.0150 Oh Kepala tukang 85,000.00 1,275.00
0.0008 Oh Mandor 90,000.00 67.50
34,642.50
N.10 1 Buah pasang door closer
1.0000 bh Pintu alumunium - swing + door closer 2,356,300.00 2,356,300.00
0.0500 Oh Pekerja tak terlatih 100,000.00 5,000.00
0.5000 Oh Tukang kayu 100,000.00 50,000.00
0.0500 Oh Kepala tukang 85,000.00 4,250.00
0.0025 Oh Mandor 90,000.00 225.00
2,415,775.00
N.11 1 Buah pasang kunci slot
1.0000 bh Slot pintu 76,500.00 76,500.00
0.0200 Oh Pekerja tak terlatih 100,000.00 2,000.00
0.2000 Oh Tukang kayu 100,000.00 20,000.00
0.0200 Oh Kepala tukang 85,000.00 1,700.00
0.0010 Oh Mandor 90,000.00 90.00
100,290.00
N.12 1 Buah pasang pegangan pintu/door holder
1.0000 bh Pegangan pintu/door holder 88,300.00 88,300.00
0.0500 Oh Pekerja tak terlatih 100,000.00 5,000.00
0.5000 Oh Tukang kayu 100,000.00 50,000.00
0.0500 Oh Kepala tukang 85,000.00 4,250.00
0.0025 Oh Mandor 90,000.00 225.00
147,775.00
N.13 1 Buah pasang door stop
1.0000 bh Door stop 88,300.00 88,300.00
0.0100 Oh Pekerja tak terlatih 100,000.00 1,000.00
0.1000 Oh Tukang kayu 100,000.00 10,000.00
0.0100 Oh Kepala tukang 85,000.00 850.00
0.0005 Oh Mandor 90,000.00 45.00
100,195.00
N.14 1 Buah pasang rel pintu dorong
1.0000 bh Rel pintu dorong 220,600.00 220,600.00
0.0600 Oh Pekerja tak terlatih 100,000.00 6,000.00
0.6000 Oh Tukang kayu 100,000.00 60,000.00
0.0600 Oh Kepala tukang 85,000.00 5,100.00
0.0030 Oh Mandor 90,000.00 270.00
291,970.00
N.15 1 Buah pasang kunci lemari
1.0000 bh Kunci lemari 40,600.00 40,600.00
0.0250 Oh Pekerja tak terlatih 100,000.00 2,500.00
0.2500 Oh Tukang kayu 100,000.00 25,000.00
0.0250 Oh Kepala tukang 85,000.00 2,125.00
0.0013 Oh Mandor 90,000.00 112.50
70,337.50
O. ANALISA PEKERJAAN KUSEN PINTU & JENDELA ALUMINIUM

O. 1 Memasang 1 Unit Pintu Type PD1(Pintu Utama)


0.4250 M3 Beton Balok/Kolom Lintle 25/25 63,635,738.67 27,045,188.94
10.5600 M2 Dinding Granit Tile 40x40 " Indogress" 350,000.00 3,696,000.00
2.0000 Unit Pintu alumunium - swing + floorhinge 3,549,400.00 7,098,800.00
7.0000 bh Paku Skrup 1,500.00 10,500.00
7.0000 bh Pisher 3,000.00 21,000.00
1.0000 Ls Upah Pasang 1,069,545.00 1,069,545.00
1.0000 Ls Alat Bantu 356,515.00 356,515.00 356,515.00
Jumlah 38,228,003.94 1,069,545.00 39,297,548.94
Dibulatkan 38,228,000.00 1,069,500.00 39,297,500.00
O. 2 Memasang 1 Unit Pintu type PD2
8.3000 M1 Kusen Aluminium Warna 4" 125,000.00 1,037,500.00
3.2250 M2 Daun Pintu Panel Multi,rangka kayu kamper 415,025.00 1,338,455.63
4.0000 M' List Karet Kaca 3,000.00 12,000.00
13.6000 M' Sealan Karet Kusen 2,500.00 34,000.00
1.5000 Psg Engsel Pintu 28,200.00 42,300.00
1.0000 Bh Kunci Pintu Double slaag 184,400.00 184,400.00
0.7250 M2 Kaca Polos 5 mm 220,600.00 159,935.00
8.0000 bh Paku Skrup 1,500.00 12,000.00
8.0000 bh Pisher 3,000.00 24,000.00
1.0000 Ls Upah Pasang 426,688.59 426,688.59
1.0000 Ls Alat Bantu 142,229.53 142,229.53
6.4500 m2 Politur Melamik 66,700.00 430,215.00
Jumlah 3,417,035.16 426,688.59 3,843,723.75
Dibulatkan 3,417,000.00 426,600.00 3,843,700.00
O. 3 Memasang 1 Unit Pintu type P1
6.9000 M1 Kusen Aluminium Warna 4" 125,000.00 862,500.00
1.0000 Unit Pintu alumunium - swing + door closer 2,356,300.00 2,356,300.00
13.8000 M' Sealan Karet Kusen 2,500.00 34,500.00
7.0000 bh Paku Skrup 1,500.00 10,500.00
7.0000 bh Pisher 3,000.00 21,000.00
1.0000 Ls Upah Pasang 492,720.00 492,720.00
1.0000 Ls Alat Bantu 164,240.00 164,240.00
Jumlah 3,449,040.00 492,720.00 3,941,760.00
Dibulatkan 3,449,000.00 492,700.00 3,941,700.00
O. 4 Memasang 1 Unit Pintu type P2
5.0000 M1 Kusen Aluminium Warna 4" 125,000.00 625,000.00
1.0000 Unit Pintu alumunium - swing + door closer 2,356,300.00 2,356,300.00
10.0000 M' Sealan Karet Kusen 2,500.00 25,000.00
7.0000 bh Paku Skrup 1,500.00 10,500.00
7.0000 bh Pisher 3,000.00 21,000.00
1.0000 Ls Upah Pasang 455,670.00 455,670.00
1.0000 Ls Alat Bantu 151,890.00 151,890.00
Jumlah 3,189,690.00 455,670.00 3,645,360.00
Dibulatkan 3,189,600.00 455,600.00 3,645,300.00
O. 5 Memasang 1 Unit Pintu type P2a
3.8000 Kg Kusen Besi C 150x50 21,259.40 80,785.72
3.1500 M2 Pintu Besi 665,025.00 2,094,828.75
1.0000 Ls Upah Pasang 326,342.17 326,342.17
1.0000 Ls Alat Bantu 108,780.72 108,780.72
Jumlah 2,284,395.19 326,342.17 2,610,737.36
Dibulatkan 2,284,300.00 326,300.00 2,610,700.00
O. 6 Memasang 1 Unit Pintu type P3
7.4000 M' Kusen Aluminium Warna 4" 125,000.00 925,000.00
1.0000 Unit Pintu alumunium - swing + door closer 665,025.00 665,025.00
13.0000 M' Sealan Karet Kusen 2,500.00 32,500.00
1.0000 Psg Kunci Pintu 100,000.00 100,000.00
8.0000 bh Paku Skrup 1,500.00 12,000.00
8.0000 bh Pisher 3,000.00 24,000.00
1.0000 Ls Upah Pasang 263,778.75 263,778.75
1.0000 Ls Alat Bantu 87,926.25 87,926.25
Jumlah 1,846,451.25 263,778.75 2,110,230.00
Dibulatkan 1,846,400.00 263,700.00 2,110,200.00
O. 7 Memasang 1 Unit Pintu type PJ1
15.3000 M' Kusen Aluminium Warna 4" 125,000.00 1,912,500.00
1.0000 Unit Pintu alumunium - swing + door closer 665,025.00 665,025.00
13.0000 M' Sealan Karet Kusen 2,500.00 32,500.00
1.0000 Psg Kunci Pintu 100,000.00 100,000.00
12.0000 bh Paku Skrup 1,500.00 18,000.00
12.0000 bh Pisher 3,000.00 36,000.00
1.0000 Ls Upah Pasang 414,603.75 414,603.75
1.0000 Ls Alat Bantu 138,201.25 138,201.25
Jumlah 2,902,226.25 414,603.75 3,316,830.00
Dibulatkan 2,902,200.00 414,600.00 3,316,800.00
O. 8 Memasang 1 Unit Pintu type PVC
1.0000 Unit Kusen +Daun Pintu PVC lengkap engsel/kunci 350,000.00 350,000.00
8.0000 bh Paku Skrup 1,500.00 12,000.00
8.0000 bh Pisher 3,000.00 24,000.00
1.0000 Ls Upah Pasang 57,900.00 57,900.00
1.0000 Ls Alat Bantu 19,300.00 19,300.00
Jumlah 405,300.00 57,900.00 463,200.00
Dibulatkan 405,300.00 57,900.00 463,200.00
O. 9 Memasang 1 Unit Pintu type J1
12.2500 M' Kusen Aluminium Warna 4" 125,000.00 1,531,250.00
9.5000 M' Sealan Karet Kusen 2,500.00 23,750.00
5.7750 M2 Kaca Polos 6 mm 240,000.00 1,386,000.00
15.2000 M' List Karet 2,500.00 38,000.00
8.0000 bh Paku Skrup 1,500.00 12,000.00
8.0000 bh Pisher 3,000.00 24,000.00
1.0000 Ls Upah Pasang 452,250.00 452,250.00
1.0000 Ls Alat Bantu 150,750.00 150,750.00
Jumlah 3,165,750.00 452,250.00 3,618,000.00
Dibulatkan 3,165,700.00 452,200.00 3,618,000.00
O. 10 Memasang 1 Unit Pintu type J6
12.5500 M' Kusen Aluminium Warna 4" 125,000.00 1,568,750.00
9.7000 M' Sealan Karet Kusen 2,500.00 24,250.00
5.2725 M2 Kaca Polos 5 mm 240,000.00 1,265,400.00
15.1000 M' List Karet 2,500.00 37,750.00
8.0000 bh Paku Skrup 1,500.00 12,000.00
8.0000 bh Pisher 3,000.00 24,000.00
1.0000 Ls Upah Pasang 439,822.50 439,822.50
1.0000 Ls Alat Bantu 146,607.50 146,607.50
Jumlah 3,078,757.50 439,822.50 3,518,580.00
Dibulatkan 3,078,700.00 439,800.00 3,518,500.00
O. 11 Memasang 1 Unit Pintu type BV
2.6000 M' Kusen Aluminium Warna 4" 125,000.00 325,000.00
5.2000 M' Sealan Karet Kusen 2,500.00 13,000.00
0.3250 M2 Kaca Polos 5 mm 240,000.00 78,000.00
2.3000 M' List Karet 2,500.00 5,750.00
6.0000 bh Paku Skrup 1,500.00 9,000.00
6.0000 bh Pisher 3,000.00 18,000.00
1.0000 Ls Upah Pasang 67,312.50 67,312.50
1.0000 Ls Alat Bantu 22,437.50 22,437.50
Jumlah 471,187.50 67,312.50 538,500.00
Dibulatkan 471,100.00 67,300.00 538,500.00
O. 12 Memasang 1 Unit Jendela type J7
8.9000 M' Kusen Aluminium Warna 4" 125,000.00 1,112,500.00
12.9000 M1 Bingkai Daun Pintu Aluminium Warna 665,025.00 8,578,822.50
13.8000 M' Sealan Karet Kusen 2,500.00 34,500.00
3.3000 M2 Kaca Polos 5 mm 240,000.00 792,000.00
14.8000 M' List Karet 2,500.00 37,000.00
2.0000 Psg Engsel Pintu 90,000.00 180,000.00
1.0000 Psg Kunci Pintu 100,000.00 100,000.00
1.0000 Psg Slot Pintu Tanam 75,000.00 75,000.00
10.0000 bh Paku Skrup 1,500.00 15,000.00
10.0000 bh Pisher 3,000.00 30,000.00
1.0000 Ls Upah Pasang 1,643,223.38 1,643,223.38
1.0000 Ls Alat Bantu 547,741.13 547,741.13
Jumlah 11,502,563.63 1,643,223.38 13,145,787.00
Dibulatkan 11,502,500.00 1,643,200.00 13,145,700.00
O. 13 Memasang 1 Unit Pintu type P2
10.3000 M' Kusen Aluminium Warna 4" 125,000.00 1,287,500.00
4.0000 M2 Daun Pintu Double Teakwood 415,025.00 1,660,100.00
15.2000 M' Sealan Karet Kusen 2,500.00 38,000.00
1.5000 M2 Kaca Polos 5 mm 240,000.00 360,000.00
7.0000 M' List Karet 2,500.00 17,500.00
2.0000 Psg Engsel Pintu 20,300.00 40,600.00
1.0000 Psg Kunci Pintu 184,400.00 184,400.00
1.0000 Psg Slot Pintu Tanam 75,000.00 75,000.00
10.0000 bh Paku Skrup 1,500.00 15,000.00
10.0000 bh Pisher 3,000.00 30,000.00
1.0000 Ls Upah Pasang 556,215.00 556,215.00
1.0000 Ls Alat Bantu 185,405.00 185,405.00
3.4000 M2 Pengecatan Politur Melamik Daun Pintu 76,307.60 259,445.84
Jumlah 4,152,950.84 556,215.00 4,709,165.84
Dibulatkan 4,152,900.00 556,200.00 4,709,100.00
O. 14 Memasang 1 Unit Pintu type P3 ( MUSHOLA)
51.4900 Kg Kusen Baja C 125.50 21,259.40 1,094,646.51
2.7750 m2 Daun Pintu baja 665,025.00 1,845,444.38
1.0000 Ls Upah Pasang 441,013.63 441,013.63
1.0000 Ls Alat Bantu 147,004.54 147,004.54
5.5500 M2 Pengecatan Daun Pintu Besi 26,572.50 147,477.38
Jumlah 3,234,572.80 441,013.63 3,675,586.43
Dibulatkan 3,234,500.00 441,000.00 3,675,500.00
O. 15 Memasang 1 Unit Pintu type P4
7.4000 M' Kusen Aluminium Warna 4" 125,000.00 925,000.00
1.5000 M2 Daun Pintu Double Teakwood+Formika 533,700.00 800,550.00
13.0000 M' Sealan Karet Kusen 2,500.00 32,500.00
0.6375 M2 Kaca Polos 5 mm 240,000.00 153,000.00
3.2000 M' List Karet 2,500.00 8,000.00
1.0000 Psg Engsel Pintu 20,300.00 20,300.00
1.0000 Psg Kunci Pintu 184,400.00 184,400.00
6.0000 bh Paku Skrup 1,500.00 9,000.00
6.0000 bh Pisher 3,000.00 18,000.00
1.0000 Ls Upah Pasang 322,612.50 322,612.50
1.0000 Ls Alat Bantu 107,537.50 107,537.50
1.7000 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 113,390.00
Jumlah 2,371,677.50 322,612.50 2,694,290.00
Dibulatkan 2,371,600.00 322,600.00 2,694,200.00
O. 16 Memasang 1 Unit Pintu type PJ1
16.3000 M' Kusen Aluminium Warna 4" 125,000.00 2,037,500.00
4.0000 M2 Daun Pintu Double Teakwood 415,025.00 1,660,100.00
1.8200 M2 Daun Jendela Kayu 395,025.00 718,945.50
9.8000 M' Sealan Karet Kusen 2,500.00 24,500.00
3.1060 M2 Kaca Polos 5 mm 240,000.00 745,440.00
1.0000 Psg Engsel Pintu 28,200.00 28,200.00
2.0000 Psg Engsel Jendela 15,000.00 30,000.00
1.0000 Psg Kunci Pintu 100,000.00 100,000.00
2.0000 Psg Slot Jendela 76,500.00 153,000.00
2.0000 Psg Kait angin Jendela 45,000.00 90,000.00
12.0000 bh Paku Skrup 1,500.00 18,000.00
12.0000 bh Pisher 3,000.00 36,000.00
1.0000 Ls Upah Pasang 846,252.83 846,252.83
1.0000 Ls Alat Bantu 282,084.28 282,084.28
11.6400 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 776,388.00
Jumlah 6,700,157.78 846,252.83 7,546,410.60
Dibulatkan 6,700,100.00 846,200.00 7,546,400.00
O. 17 Memasang 1 Unit Jendela type J8
13.3500 M' Kusen Aluminium Warna 4" 125,000.00 1,668,750.00
1.8200 M2 Daun Jendela Kayu 395,025.00 718,945.50
17.8000 M' Sealan Karet Kusen 2,500.00 44,500.00
3.7560 M2 Kaca Polos 5 mm 240,000.00 901,440.00
2.0000 Psg Engsel Jendela 15,000.00 30,000.00
2.0000 Psg Slot Jendela 76,500.00 153,000.00
2.0000 Psg Kait angin Jendela 45,000.00 90,000.00
10.0000 bh Paku Skrup 1,500.00 15,000.00
10.0000 bh Pisher 3,000.00 30,000.00
1.0000 Ls Upah Pasang 547,745.33 547,745.33
1.0000 Ls Alat Bantu 182,581.78 182,581.78
3.6400 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 242,788.00
Jumlah 4,077,005.28 547,745.33 4,624,750.60
Dibulatkan 4,077,000.00 547,700.00 4,624,700.00
O. 18 Memasang 1 Unit Jendela type BV-1 ( MUSHOLA)
4.6000 M' Kusen Aluminium Warna 4" 125,000.00 575,000.00
0.4200 M2 Daun Jendela Kayu 395,025.00 165,910.50
7.8000 M' Sealan Karet Kusen 2,500.00 19,500.00
0.7200 M2 Kaca Polos 5 mm 240,000.00 172,800.00
4.8000 M' List Karet 2,500.00 12,000.00
1.0000 Psg Engsel Jendela 15,000.00 15,000.00
1.0000 Psg Slot Jendela 76,500.00 76,500.00
1.0000 Psg Kait angin Jendela 45,000.00 45,000.00
6.0000 bh Paku Skrup 1,500.00 9,000.00
6.0000 bh Pisher 3,000.00 18,000.00
1.0000 Ls Upah Pasang 166,306.58 166,306.58
1.0000 Ls Alat Bantu 55,435.53 55,435.53
Jumlah 1,164,146.03 166,306.58 1,330,452.60
Dibulatkan 1,164,100.00 166,300.00 1,330,400.00
O. 19 Memasang 1 Unit Jendela type BV-2 ( MUSHOLA)
6.4000 M' Kusen Aluminium Warna 4" 125,000.00 800,000.00
0.8400 M2 Daun Jendela Kayu 395,025.00 331,821.00
10.0000 M' Sealan Karet Kusen 2,500.00 25,000.00
1.0800 M2 Kaca Polos 5 mm 240,000.00 259,200.00
7.2000 M' List Karet 2,500.00 18,000.00
2.0000 Psg Engsel Jendela 15,000.00 30,000.00
2.0000 Psg Slot Jendela 76,500.00 153,000.00
2.0000 Psg Kait angin Jendela 45,000.00 90,000.00
8.0000 bh Paku Skrup 1,500.00 12,000.00
8.0000 bh Pisher 3,000.00 24,000.00
1.0000 Ls Upah Pasang 261,453.15 261,453.15
1.0000 Ls Alat Bantu 87,151.05 87,151.05
Jumlah 1,830,172.05 261,453.15 2,091,625.20
Dibulatkan 1,830,100.00 261,400.00 2,091,600.00
O. 20 Memasang 1 Unit Jendela type BV-3( MUSHOLA)
7.3000 M' Kusen Aluminium Warna 4" 125,000.00 912,500.00
12.2000 M' Sealan Karet Kusen 2,500.00 30,500.00
1.5600 M2 Kaca Polos 5 mm 240,000.00 374,400.00
8.7000 M' List Karet 2,500.00 21,750.00
8.0000 bh Paku Skrup 1,500.00 12,000.00
8.0000 bh Pisher 3,000.00 24,000.00
1.0000 Ls Upah Pasang 206,272.50 206,272.50
1.0000 Ls Alat Bantu 68,757.50 68,757.50
Jumlah 1,443,907.50 206,272.50 1,650,180.00
Dibulatkan 1,443,900.00 206,200.00 1,650,100.00
O. 21 Memasang 1 Unit Jendela type BV-4( MUSHOLA)
5.9000 M' Kusen Aluminium Warna 4" 125,000.00 737,500.00
10.6000 M' Sealan Karet Kusen 2,500.00 26,500.00
1.3000 M2 Kaca Polos 5 mm 240,000.00 312,000.00
6.6000 M' List Karet 2,500.00 16,500.00
6.0000 bh Paku Skrup 1,500.00 9,000.00
6.0000 bh Pisher 3,000.00 18,000.00
1.0000 Ls Upah Pasang 167,925.00 167,925.00
1.0000 Ls Alat Bantu 55,975.00 55,975.00
Jumlah 1,175,475.00 167,925.00 1,343,400.00
Dibulatkan 1,175,400.00 167,900.00 1,343,400.00
O. 22 Memasang 1 Unit Pintu type PJ1 ( ATM)
14.0500 M' Kusen Aluminium Warna 4" 125,000.00 1,756,250.00
6.7500 M1 Bingkai Daun Pintu Aluminium Warna 665,025.00 4,488,918.75
13.0000 M' Sealan Karet Kusen 2,500.00 32,500.00
5.8275 M2 Kaca Polos 5 mm 240,000.00 1,398,600.00
21.1000 M' List Karet 2,500.00 52,750.00
5.8275 M2 Stiker Etsa Kaca 15,000.00 87,412.50
1.0000 Psg Engsel Pintu 90,000.00 90,000.00
1.0000 Psg Kunci Pintu 100,000.00 100,000.00
12.0000 bh Paku Skrup 1,500.00 18,000.00
12.0000 bh Pisher 3,000.00 36,000.00
1.0000 Ls Upah Pasang 1,209,064.69 1,209,064.69
1.0000 Ls Alat Bantu 403,021.56 403,021.56
Jumlah 8,463,452.81 1,209,064.69 9,672,517.50
Dibulatkan 8,463,400.00 1,209,000.00 9,672,500.00
O. 23 Memasang 1 Unit Pintu type PJ2 ( ATM)
15.8000 M' Kusen Aluminium Warna 4" 125,000.00 1,975,000.00
6.7500 M1 Bingkai Daun Pintu Aluminium Warna 665,025.00 4,488,918.75
13.0000 M' Sealan Karet Kusen 2,500.00 32,500.00
7.8150 M2 Kaca Polos 5 mm 240,000.00 1,875,600.00
24.1000 M' List Karet 2,500.00 60,250.00
7.8150 M2 Stiker Etsa Kaca 15,000.00 117,225.00
1.0000 Psg Engsel Tanam (Floor Hinges) ex Dorma 1,000,000.00 1,000,000.00
1.0000 Psg Kunci Pintu Tanam 450,000.00 450,000.00
8.0000 bh Paku Skrup 1,500.00 12,000.00
8.0000 bh Pisher 3,000.00 24,000.00
1.0000 Ls Upah Pasang 1,505,324.06 1,505,324.06
1.0000 Ls Alat Bantu 501,774.69 501,774.69
Jumlah 10,537,268.44 1,505,324.06 12,042,592.50
Dibulatkan 10,537,200.00 1,505,300.00 12,042,500.00
O. 24 Memasang 1 Unit Jendela type J-1( ATM)
12.3500 M' Kusen Aluminium Warna 4" 125,000.00 1,543,750.00
19.6000 M' Sealan Karet Kusen 665,025.00 13,034,490.00
5.9625 M2 Kaca Polos 5 mm 240,000.00 1,431,000.00
14.3000 M' List Karet 2,500.00 35,750.00
5.9625 M2 Stiker Etsa Kaca 15,000.00 89,437.50
8.0000 bh Paku Skrup 1,500.00 12,000.00
8.0000 bh Pisher 3,000.00 24,000.00
1.0000 Ls Upah Pasang 2,425,564.13 2,425,564.13
1.0000 Ls Alat Bantu 808,521.38 808,521.38
Jumlah 16,978,948.88 2,425,564.13 19,404,513.00
Dibulatkan 16,978,900.00 2,425,500.00 19,404,500.00
O. 25 Memasang 1 Unit Jendela type J-2( ATM)
8.7000 M' Kusen Aluminium Warna 4" 125,000.00 1,087,500.00
13.1000 M' Sealan Karet Kusen 665,025.00 8,711,827.50
2.1525 M2 Kaca Polos 5 mm 240,000.00 516,600.00
6.2500 M' List Karet 2,500.00 15,625.00
2.1525 M2 Stiker Etsa Kaca 15,000.00 32,287.50
6.0000 bh Paku Skrup 1,500.00 9,000.00
6.0000 bh Pisher 3,000.00 18,000.00
1.0000 Ls Upah Pasang 1,558,626.00 1,558,626.00
1.0000 Ls Alat Bantu 519,542.00 519,542.00
Jumlah 10,910,382.00 1,558,626.00 12,469,008.00
Dibulatkan 10,910,300.00 1,558,600.00 12,469,000.00
O. 26 Memasang 1 Unit Pintu type PJ3 ( ATM)
13.1130 M' Kusen Aluminium Warna 4" 125,000.00 1,639,125.00
11.4000 M1 Bingkai Daun Pintu Aluminium Warna 665,025.00 7,581,285.00
8.7540 M' Sealan Karet Kusen 2,500.00 21,885.00
5.5554 M2 Kaca Polos 5 mm 240,000.00 1,333,296.00
25.1480 M' List Karet 2,500.00 62,870.00
5.5554 M2 Stiker Etsa Kaca 15,000.00 83,331.00
2.0000 Psg Engsel Pintu 90,000.00 180,000.00
2.0000 Psg Kunci Pintu Silinder 100,000.00 200,000.00
2.0000 Psg Door Closer 350,000.00 700,000.00
8.0000 bh Paku Skrup 1,500.00 12,000.00
8.0000 bh Pisher 3,000.00 24,000.00
1.0000 Ls Upah Pasang 1,775,668.80 1,775,668.80
1.0000 Ls Alat Bantu 591,889.60 591,889.60
Jumlah 12,429,681.60 1,775,668.80 14,205,350.40
Dibulatkan 12,429,600.00 1,775,600.00 14,205,300.00
O. 27 Memasang 1 Unit Jendela type J-1( LOKET)
11.7000 M' Kusen Aluminium Warna 4" 125,000.00 1,462,500.00
23.4000 M' Sealan Karet Kusen 2,500.00 58,500.00
6.3000 M2 Kaca Polos 5 mm 240,000.00 1,512,000.00
10.3000 M' List Karet 2,500.00 25,750.00
8.0000 bh Paku Skrup 1,500.00 12,000.00
8.0000 bh Pisher 3,000.00 24,000.00
1.0000 Ls Upah Pasang 464,212.50 464,212.50
1.0000 Ls Alat Bantu 154,737.50 154,737.50
Jumlah 3,249,487.50 464,212.50 3,713,700.00
Dibulatkan 3,249,400.00 464,200.00 3,713,700.00
O. 28 Memasang 1 Unit Pintu type P1 ( MESS)
7.2000 M' Kusen Aluminium Warna 4" 125,000.00 900,000.00
1.7000 M2 Daun Pintu Double Teakwood+Formika 533,700.00 907,290.00
12.8000 M' Sealan Karet Kusen 2,500.00 32,000.00
0.5100 M2 Kaca Polos 5 mm 240,000.00 122,400.00
2.9000 M' List Karet 2,500.00 7,250.00
1.0000 Psg Engsel Pintu 20,300.00 20,300.00
1.0000 Psg Kunci Pintu 184,400.00 184,400.00
6.0000 bh Paku Skrup 1,500.00 9,000.00
6.0000 bh Pisher 3,000.00 18,000.00
1.0000 Ls Upah Pasang 330,096.00 330,096.00
1.0000 Ls Alat Bantu 110,032.00 110,032.00
1.7000 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 113,390.00
Jumlah 2,424,062.00 330,096.00 2,754,158.00
Dibulatkan 2,424,000.00 330,000.00 2,754,100.00
O. 29 Memasang 1 Unit Pintu type PJ1 ( MESS)
12.6500 M' Kusen Aluminium Warna 4" 125,000.00 1,581,250.00
1.7000 M2 Daun Pintu Double Teakwood 415,025.00 705,542.50
0.7500 M2 Daun Jendela Kayu 395,025.00 296,268.75
14.4000 M' Sealan Karet Kusen 2,500.00 36,000.00
1.5850 M2 Kaca Polos 5 mm 240,000.00 380,400.00
8.8000 M' List Karet 2,500.00 22,000.00
1.0000 Psg Engsel Pintu 28,200.00 28,200.00
1.0000 Psg Engsel Jendela 15,000.00 15,000.00
1.0000 Psg Kunci Pintu 100,000.00 100,000.00
1.0000 Psg Slot Jendela 76,500.00 76,500.00
1.0000 Psg Kait angin Jendela 45,000.00 45,000.00
10.0000 bh Paku Skrup 1,500.00 15,000.00
10.0000 bh Pisher - -
1.0000 Ls Upah Pasang 495,174.19 495,174.19
1.0000 Ls Alat Bantu 165,058.06 165,058.06
4.9000 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 326,830.00
Jumlah 3,793,049.31 495,174.19 4,288,223.50
Dibulatkan 3,793,000.00 495,100.00 4,288,200.00
O. 30 Memasang 1 Unit Pintu type J1 ( MESS)
10.9500 M' Kusen Aluminium Warna 4" 125,000.00 1,368,750.00
1.5000 M2 Daun Jendela Kayu 395,025.00 592,537.50
14.6000 M' Sealan Karet Kusen 2,500.00 36,500.00
2.2800 M2 Kaca Polos 5 mm 240,000.00 547,200.00
2.0000 Psg Engsel Jendela 15,000.00 30,000.00
2.0000 Psg Slot Jendela 76,500.00 153,000.00
2.0000 Psg Kait angin Jendela 45,000.00 90,000.00
10.0000 bh Paku Skrup 1,500.00 15,000.00
10.0000 bh Pisher 3,000.00 30,000.00
1.0000 Ls Upah Pasang 429,448.13 429,448.13
1.0000 Ls Alat Bantu 143,149.38 143,149.38
3.0000 M2 Pengecatan Politur Melamik Daun Pintu 66,700.00 200,100.00
Jumlah 3,206,236.88 429,448.13 3,635,685.00
Dibulatkan 3,206,200.00 429,400.00 3,635,600.00
O. 31 Memasang 1 Unit Jendela type BV-1 ( MESS)
8.1000 M' Kusen Aluminium Warna 4" 125,000.00 1,012,500.00
10.8000 M' Sealan Karet Kusen 2,500.00 27,000.00
1.5200 M2 Kaca Polos 5 mm 240,000.00 364,800.00
7.0000 M' List Karet 2,500.00 17,500.00
6.0000 bh Paku Skrup 1,500.00 9,000.00
6.0000 bh Pisher 3,000.00 18,000.00
1.0000 Ls Upah Pasang 217,320.00 217,320.00
1.0000 Ls Alat Bantu 72,440.00 72,440.00
Jumlah 1,521,240.00 217,320.00 1,738,560.00
Dibulatkan 1,521,200.00 217,300.00 1,738,500.00
O. 32 Memasang 1 M2 Pasang Partisi Toilet lapis Melamik
1.3333 Btg Rangka Hollow 40x40 mm 150,000.00 200,000.00
0.6719 Lbr Melamito 4 mm 112,000.00 75,248.59
6.0000 bh Paku Repet 500.00 3,000.00
25.0000 bh Paku Skrup 1,500.00 37,500.00
25.0000 bh Pisher 3,000.00 75,000.00
1.0000 Ls Upah Pasang 58,612.29 58,612.29
1.0000 Ls Alat Bantu 19,537.43 19,537.43
Jumlah 210,286.02 58,612.29 268,898.31
Keuntungan Max 21,028.60 5,861.23 26,889.83
Jumlah Total 231,314.62 64,473.52 295,788.14
Dibulatkan 231,300.00 64,400.00 295,700.00
O. 33 Memasang 1 M1 Railling Tangga lengkap
0.50 kg Plat Dudukan Tiang Railling 17,300.00 8,650.00
2.00 bh DinaBolt dia.12 mm 13,100.00 26,200.00
0.25 btg Pipa Tiang Stainlesstell dia. 1,5" 470,550.00 117,637.50
0.15 btg Railling Pipa Bawah Stainlesstell dia. 1" 264,960.00 39,744.00
0.15 btg Railling Pipa Tengah Stainlesstell dia. 3/4" 230,400.00 34,560.00
0.15 btg Railling Pipa Atas Stainlesstell dia. 1" 264,960.00 39,744.00
1.20 btg Railling Pipa Vertikal Stainlesstell dia. 3/4" 230,400.00 276,480.00
1.0000 Ls Upah Pasang Pabrikasi Teralis besi 81,452.33 81,452.33
1.0000 Ls Upah Pasang +Pabikasi Railling 27,150.78 27,150.78
` 1.00 Ls Poles Stainlesstel 13,575.39 13,575.39
Jumlah 556,590.89 108,603.10 665,193.99
Keuntungan Max 55,659.09 10,860.31 66,519.40
Jumlah Total 612,249.98 119,463.41 731,713.39
Dibulatkan 612,200.00 119,400.00 731,700.00
DAFTAR REKAPITULASI ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BANGKA BELITUNG
TAHUN ANGGARAN 2009

KODE
URAIAN PEKERJAAN JUMLAH (Rp.) KETERANGAN
ANALISA
1 2 3 4
A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

A.1 1 m' Pagar sementara dari kayu tinggi 2 m 2,495,640.63 Harga satuan
A.2 1 m' Pagar sementara dari seng gelombang tinggi 2 m 2,586,282.88 tidak termasuk PPN
A.3 1 m' Pagar sementara dari kawat berduri tinggi 1,8 m 2,357,049.68
A.4 1 m' Pengukuran dan pemasangan bouwplank, papan 2/20 56,969.42
A.5 1 m² Pembuatan kantor sementara dengan lantai plesteran #N/A
A.6 1 m² Pembuatan gudang semen dan alat - alat 4,543,604.00
A.7 1 m² Membersihkan lapangan dan peralatan 10,450.00
A.8 1 m² Pembuatan bak adukan ukuran 40 cm x 50 cm x 20 cm 120,970.26
A.9 1 m² Pembuatan bedeng buruh 4,570,290.80
A.10 1 m² Pembuatan stegger 2,104,040.00
A.11 1 m² Pembuatan jalan sementara (dengan tenaga) 222,610.00
A.12 1 m² Pembuatan jalan sementara, tebal 25 cm (dengan tenaga) 281,870.00
A.13 1 m³ Bongkaran beton bertulang 696,670.00
A.14 1 m³ Bongkaran dinding tembok bata merah 696,670.00
A.15 1 m² Bongkaran lantai 20,900.00
A.16 1 m² Menurunkan atap genteng/sirap 2,900.00
A.17 1 m² Menurunkan atap seng 14,000.00
A.18 1 m² Membongkar rangka atap 13,162.50
A.19 1 m³ Membongkar rangka kuda-kuda kayu 1,069,000.00
A.20 1 m² Membongkar langit-langit + rangka 23,162.50

B. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP TANAH

B.1 1 m³ Galian Tanah biasa Sedalam 1 m (dengan tenaga) 43,600.00


B.2 1 m³ Galian Tanah biasa Sedalam 2 m (dengan tenaga) 57,280.00
B.3 1 m³ Galian Tanah biasa Sedalam 3 m (dengan tenaga) 80,070.00
B.4 1 m³ Galian Tanah Keras Sedalam 1 m (dengan tenaga) 68,080.00
B.5 1 m³ Galian Tanah Cadas Sedalam 1 m (dengan tenaga) 136,250.00
B.6 1 m³ Galian Tanah Lumpur Sedalam 1 m (dengan tenaga) 89,770.00
B.7 1 m³ Pekerjaan Stripping Setinggi 1 m (dengan tenaga) 5,450.00
B.8 1 m³ Pembuangan Tanah Sejauh 150 m (dengan tenaga) 56,100.00
B.9 1 m³ Urugan Kembali (dengan tenaga) 20,910.00
B.10 1 m³ Pemadatan Tanah (dengan tenaga) 54,500.00
B.11 1 m³ Urugan Pasir (dengan tenaga) 570,900.00
B.12 1 m³ Urugan Sirtu (dengan tenaga) 119,050.00
B.13 1 m³ Urugan Tanah Puru (dengan tenaga) 122,700.00

C. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

C.1 1 m³ Pasang Pondasi Batu Belah 1 PC : 2 Ps 23,926,000.00


C.2 1 m³ Pasang Pondasi Batu Belah 1 PC : 4 Ps 15,023,850.00
C.3 1 m³ Pasang Pondasi Batu Kali. 1 PC : 5 Ps 12,712,650.00
C.4 1 m³ Pasang Pondasi Batu Kali. 1 PC : 6 Ps 11,086,300.00
C.5 1 m³ Pasang pondasi batu kosong 858,825.00
C.6 1 m³ Pasang pondasi siklop, 40% batu pecah 2-3 cm 20,187,569.80
C.7 1 m³ Pasang pondasi bored pile ø 40 cm 25,194,963.60
C.8 1 m³ Pembuatan tiang pancang 40 cm x 40 cm beton bertulang 6,805,214.70
C.9 1 m³ Pembuatan tiang pancang 35 cm x 35 cm beton bertulang 5,459,774.19
C.10 1 m³ Pembuatan tiang pancang 30 cm x 30 cm beton bertulang 4,011,262.67

D. ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN DINDING

D.1 1 m² Pasang Dinding Bataco Uk. 20 cm x 40 cm, 1 PC : 4 Ps 553,256.67


D.2 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 2 Ps 4,328,400.00
D.3 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 4 Ps 2,876,550.00
D.4 1 m² Pasang Dinding Bata merah tebal 1 bata, 1 PC : 5 Ps 2,506,500.00
D.5 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 2 Ps 1,922,000.00
D.6 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 4 Ps 1,283,550.00
D.7 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 5 Ps 1,127,930.00
D.8 1 m² Pasang Dinding Bata merah tebal 1/2 bata, 1 PC : 6 Ps 1,012,770.00
D.9 1 m² Pasang dinding hollowblock (H.B. 20) 2,225,555.00
D.10 1 m² Pasang dinding hollowblock (H.B. 15) 1,798,570.00
D.11 1 m² Pasang dinding hollowblock (H.B. 10) 1,471,500.00
D.12 1 m² Pasang dinding conblock (C.B. 10) 1,620,788.11
D.13 1 m² Pasang dinding conblock (C.B. 15) 1,710,814.38
D.14 1 m² Pasang dinding lantai 761,388.00
D.15 1 m² Pasang dinding roster uk. 20 cm x 20 cm 1,303,125.00
D.16 1 m² Pasang dinding rooster / krawang uk. 12 cm x 11 cm x 24 cm 1,525,950.00
D.17 1 m² Pasang dinding bata berongga uk. 5 cm x 11 cm x 24 cm #N/A
D.18 1 m² Pasang dinding anyaman bambu, rangka kayu 65,665.00
KODE
URAIAN PEKERJAAN JUMLAH (Rp.) KETERANGAN
ANALISA
1 2 3 4
E. ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

E.1 1 m² Plesteran 1 PC : 2 Ps, tebal 15 mm 777,545.00


E.2 1 m² Plesteran 1 PC : 4 Ps, tebal 15 mm 493,375.00
E.3 1 m² Plesteran 1 PC : 5 Ps, tebal 15 mm 418,595.00
E.4 1 m² Plesteran 1 PC : 2 Ps, tebal 20 mm 1,286,255.00
E.5 1 m² Plesteran 1 PC : 4 Ps, tebal 20 mm 806,905.00 Harga satuan
E.6 1 m² Plesteran 1 PC : 5 Ps, tebal 20 mm 687,365.00 tidak termasuk PPN
E.7 1 m² Plesteran 1 PC : 2 Ps, tebal 25 mm 1,391,720.00
E.8 1 m² Plesteran 1 PC : 4 Ps, tebal 25 mm 885,250.00
E.9 1 m² Plesteran 1 PC : 5 Ps, tebal 25 mm 753,260.00
E.10 1 m² Plesteran 1 PC : 2 Ps, tebal 30 mm 1,680,125.00
E.11 1 m² Plesteran 1 PC : 4 Ps, tebal 30 mm 1,058,055.00
E.12 1 m² Plesteran 1 PC : 5 Ps, tebal 30 mm 785,065.00
E.13 1 m² Plesteran beton 1 PC : 2 Ps, tebal 15 mm 856,770.00
E.14 1 m² Plesteran beton 1 PC : 3 Ps, tebal 15 mm 666,340.00
E.15 1 m² Plesteran ciprat 1Pc : 2 Ps 415,920.00
E.16 1 m² Plesteran siar, 1 PC : 2 Ps 402,035.00
E.17 1 m² Plesteran waterproof batacote, 3 lapis 277,970.00

F. ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU

F.1 1 m³ Pasang kusen pintu / jendela, kayu kelas II 5,547,000.00


F.2 1 m³ Pasang balok profil, kayu kelas III (non SNI) 1,997,075.00
F.3 1 m² Pasang daun pintu / jendela panel, kayu kelas II 475,750.00
F.4 1 m² Pasang daun pintu / jendela kaca bening tebal 3 mm, kayu kelas II 629,225.00
F.5 1 m² Pasang daun pintu / jendela kaca bening tebal 5 mm, kayu kelas II 661,225.00
F.5a 1 m² Pasang daun pintu / jendela kaca ryben tebal 5 mm, kayu kelas II 395,025.00
F.6 1m² Pasang Daun pintu/ jendela dg Jalusi, Kayu kelas II 612,500.00
F.7 1 m² Pasang daun pintu plywood rangkap, rangka kayu kelas II 460,325.00
F.8 1 m² Pasang daun pintu teakwood rangkap, rangka kayu kelas II 415,025.00
F.9 1 m² Pasang daun pintu plywood dan formika, rangka kayu kelas II 589,675.00
F.10 1 m² Pasang daun pintu teakwood dan formika, rangka kayu kelas II 506,125.00
F.11 1 m² Pasang daun pintu formika double, rangka kayu kelas II 672,725.00
F.12 1 m² Pasang jalusi mati, kayu kelas II 424,875.00
F.13 1 m³ Pasang konstruksi kuda-kuda, kayu kelas II 5,309,250.00
F.14 1 m³ Pasang gording kuda-kuda, kayu kelas II (non SNI) 3,646,000.00
F.15 1 m² Pasang kaso + reng untuk genteng, kayu kelas II 75,810.00
F.16 1 m² Pasang rangka langit-langit uk. 1 m x 1 m, kayu kelas II 83,375.00
F.17 1 m² Pasang rangka langit-langit uk. 30 cm x 60 cm, kayu kelas II 117,700.00
F.18 1 m² Pasang rangka langit-langit uk. 30 cm x 30 cm, kayu kelas II 140,600.00
F.19 1 m² Pasang lisplank uk. 3 cm x 20 cm, kayu kelas II 52,400.00
F.20 1 m² Pasang lisplank uk. 3 cm x 30 cm, kayu kelas II 65,070.00
F.21 1 m² Pasang lisplank 2 x (3 cm x 20 cm), kayu kelas II 87,825.00
F.22 1 m² Pasang lisplank 2 x (2 cm x 20 cm), kayu kelas II 49,550.00
F.23 1 m² Pasang rangka dinding pemisah papan, kayu kelas II 141,325.00
F.24 1 m³ Pasang rangka dinding pemisah triplek rangkap rangka kayu kelas III 249,490.00
F.25 1 m² Pasang rangka dinding pemisah teakwood rangkap, kayu kelas II 234,065.00
F.26 1 m² Pasang rangka dinding pemisah plywood rangkap, kayu kelas II 294,790.00
F.27 1 m² Pasang dinding plywood, 61,349.50
F.28 1 m' Pasang list plafond, dengan kayu profil 3 cm x 3 cm, kayu kelas II 1,844,210.00
F.29 1 m² Pasang papan nama proyek, kayu kelas III 321,050.00
F.30 1 m³ Pasang balok gelegar kayu, kayu kelas II 2,760,650.00
F.31 1 m³ Pasang balok sandaran jembatan kayu / balok pemikul, kayu kelas II 2,784,400.00
F.32 1 m² Pasang lantai jembatan dengan papan t = 8 cm, kayu kelas II 225,471.50
F.33 1 m² Pasang lantai jembatan dengan papan t = 8 cm di atas gelegar besi, kayu kelas II 264,275.00
F.34 1 m² Pasang lantai jembatan dengan papan t = 5 cm, kayu kelas II 150,471.50
F.35 1 m² Pasang lantai jembatan dengan papan t = 5 cm di atas gelegar besi, kayu kelas II 620,475.00

G. ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON

G.1 1 m² Membuat lantai kerja beton tumbuk, 1 PC : 3 Ps : 5 krk, tebal 5 cm (n0n SNI) 1,009,452.88
G.2 1 m³ Membuat beton tumbuk, 1 PC : 2 Ps : 3 krk 20,740,630.60
G.3 1 m³ Membuat beton tumbuk, 1 PC : 3 Ps : 5 krk 19,577,627.40
G.4 1 m³ Membuat beton tumbuk, 1 PC : 3 Ps : 6 krk 17,781,013.80
G.5 1 m³ Membuat beton bertulang, 1 PC : 1,5 Ps : 3 krk 31,336,305.80
G.6 1 m³ Membuat profil ad. 1 PC : 1,5 Ps (non SNI) 68,401,500.00
G.7 1 m³ Membuat beton bertulang, 1 PC : 1 Ps : 2 krk 41,896,909.80
G.8 1 m³ Membuat beton bertulang, 1 PC : 2 Ps : 4 krk 24,891,793.00
G.9 1 m³ Membuat beton bertulang, 1 PC : 1,5 Ps : 3 split 32,488,832.60
G.10 1 m³ Membuat beton bertulang, 1 PC : 2 Ps : 3 split 29,835,946.20
G.11 1 m³ Membuat tiang pancang prestressed beton 38,637,105.00
G.12 1 m³ Membuat beton kedap air dengan strorox-100 35,400,191.00
G.13 1 kg Pembesian dengan besi polos/ulir 30,167.25
G.14 1 kg Kabel prestressed polos / strands #N/A
G.15 1 kg Jaring kawat baja #N/A
G.16 Pembongkaran Bekisting 1 m³ beton 200,000.00
G.17 1 m³ Membuat dinding beton bertulang (150 kg besi + bekisting) 74,292,371.09
G.18 1 m² Pasang bekisting untuk pondasi 116,802.00
G.19 1 m² Pasang bekisting untuk sloof 125,186.00
KODE
URAIAN PEKERJAAN JUMLAH (Rp.) KETERANGAN
ANALISA
1 2 3 4
G.20 1 m² Pasang bekisting untuk kolom 3,527,856.78
G.21 1 m² Pasang bekisting untuk balok 3,535,614.74
G.22 1 m² Pasang bekisting untuk lantai 10,129,856.78
G.23 1 m³ Membuat beton mutu K. 225 30,392,088.00
G.24 1 m³ Membuat beton mutu K. 275 35,689,026.40
G.25 1 m² Pasang bekisting untuk jembatan cor 917,322.52
G.26 1 m³ Membuat pondasi beton bertulang (150 kg besi + bekisting) 33,543,333.10
G.27 1 m³ Membuat sloof beton bertulang (200 kg besi + bekisting) 35,241,446.60
G.28 1 m³ Membuat kolom beton bertulang (150 kg besi + bekisting) 87,984,658.35
G.29 1 m³ Membuat kolom beton bertulang (300 kg besi + bekisting) 72,557,598.41 Harga satuan
G.30 1 m³ Membuat dinding beton bertulang (150 kg besi + bekisting) 74,317,011.09 tidak termasuk PPN
G.31 1 m³ Membuat dinding beton bertulang (200 kg besi + bekisting)/(non SNI) 59,044,929.06
G.32 1 m' Membuat kolom penguat beton bertulang uk. 11 cm x 11 cm 458,305.78
G.33 1 m' Membuat ringbalk beton bertulang uk. 10 cm x 15 cm 609,315.70
G.34 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk sloof, dengan pembesian 100 kg 33,774,994.42
G.35 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk kolom, dengan pembesian 100 kg 73,764,138.45
G.36 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk balok, dengan pembesian 100 kg 63,635,738.67
G.37 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan pembesian 100 kg 117,434,378.18
G.38 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan pembesian 75 kg 116,680,196.93
G.39 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk lantai, dengan Pembesian 200 kg 41,474,896.60
G.40 1 m³ Membuat beton bertulang 1 : 2 : 3 untuk sloof, dengan pembesian 75 kg 33,020,813.17

H. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP

H.1 1 m² Pasang atap genteng kodok / glazzur 102,650.00


H.2 1 m² Pasang roof light fibreglass uk. 180 cm x 90 cm 97,960.00
H.3 1 m² Pasang atap asbes gelombang uk. 2.500 mm x 920 mm, tebal 5 mm 99,440.00
H.4 1 m² Pasang atap asbes gelombang uk. 2.250 mm x 920 mm, tebal 5 mm 105,160.00
H.5 1 m² Pasang atap asbes gelombang uk. 2.000 mm x 920 mm, tebal 5 mm 96,580.00
H.6 1 m² Pasang atap asbes gelombang uk. 1.800 mm x 920 mm, tebal 5 mm 58,015.00
H.7 1 m² Pasang atap asbes gelombang uk. 3.000 mm x 1.050 mm, tebal 4 mm 71,645.00
H.8 1 m² Pasang atap asbes gelombang uk. 2.700 mm x 1.050 mm, tebal 4 mm 76,279.00
H.9 1 m² Pasang atap asbes gelombang uk. 2.400 mm x 1.050 mm, tebal 4 mm 69,381.00
H.10 1 m² Pasang atap asbes gelombang uk. 2.100 mm x 1.050 mm, tebal 4 mm 73,681.00
H.11 1 m² Pasang atap asbes gelombang uk. 1.500 mm x 1.050 mm, tebal 4 mm 84,165.00
H.12 1 m² Pasang atap asbes gelombang uk. 3.000 mm x 1.080 mm, tebal 6 mm 97,154.00
H.13 1 m² Pasang atap asbes gelombang uk. 2.700 mm x 1.080 mm, tebal 6 mm 93,465.00
H.14 1 m² Pasang atap asbes gelombang uk. 2.400 mm x 1.080 mm, tebal 6 mm 93,481.00
H.15 1 m² Pasang atap asbes gelombang uk. 2.100 mm x 1.080 mm, tebal 6 mm 94,144.00
H.16 1 m² Pasang atap asbes gelombang uk. 1.800 mm x 1.080 mm, tebal 6 mm 58,600.00
H.17 1 m² Pasang atap genteng beton 87,673.75
H.18 1 m² Pasang atap metal 129,396.00
H.19 1 m² Pasang atap alumunium super sheet 370,344.00
H.20 1 m² Pasang atap seng gelombang 72,310.00
H.21 1 m² Pasang atap nok seng 48,420.00
H.22 1 m' Pasang atap nok genteng kodok 800,280.00
H.23 1 m' Pasang atap nok genteng beton 1,042,968.13
H.24 1 m' Pasang atap nok genteng metal 132,485.00
H.25 1 m' Pasang atap nok alumunium 214,538.00
H.26 1 m' Pasang atap nok genteng soka 783,000.00
H.27 1 m² Pasang Aluminium Foil 119,490.00
H.28 1 m² Pasang atap metal batuan /tekstur 138,372.00

I. ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT

I.1 1 m² Langit-langit asbes 1 m x 1 m, tebal 4 mm 47,075.00


I.2 1 m² Langit-langit asbes 1 m x 1 m, tebal 5 mm 48,945.00
I.3 1 m² Langit-langit asbes 1 m x 1 m, tebal 6 mm 51,915.00
I.4 1 m² Langit-langit akustik uk. 30 cm x 30 cm + rangka alumunium (non SNI) 936,109.50
I.5 1 m² Langit-langit akustik uk. 30 cm x 60 cm + rangka alumunium 103,086.00
I.6 1 m² Langit-langit akustik uk. 60 cm x 120 cm + rangka alumunium 370,160.00
I.7 1 m² Langit-langit plywood uk. 30 cm x 60 cm, tebal 4 mm 45,642.00
I.8 1 m² Langit-langit plywood uk. 30 cm x 60 cm, tebal 6 mm 47,874.00
I.9 1 m² Langit-langit plywood uk. 60 cm x 120 cm, tebal 4 mm 48,427.50
I.10 1 m² Langit-langit plywood uk. 60 cm x 120 cm, tebal 6 mm 48,427.50
I.11 1 m² Langit-langit teakwood uk. 30 cm x 60 cm, tebal 4 mm 46,830.00
I.12 1 m² Langit-langit soft board 20,922.50
I.13 1 m² Langit-langit gypsum board, tebal 9 mm 36,597.14
I.14 1 m² Langit-langit akustik uk. 30 cm x 30 cm + rangka kayu kelas III 924,540.00
I.15 1 m² Langit-langit akustik uk. 30 cm x 60 cm + rangka kayu kelas III 523,000.00
I.16 1 m² Langit-langit plywood tebal 4 mm + rangka kayu kelas III 162,067.00
I.17 1 m² Kompon Gypsum (nonSNI) 35,052.80
I.18 1 m² Amplas Gypsum (non SNI) 20,097.40
I.19 1 m' List langit-langit kayu profil 2,761,145.00

J. ANALISA BIAYA KONSTRUKSI PEKERJAAN PIPA DAN SANITASI

J.1 Memasang 1 buah klosed duduk / monoblock 2,624,729.00


J.2 Memasang 1 buah klosed jongkok porselin 1,372,400.00
J.3 Memasang 1 buah klosed jongkok keramik 1,010,400.00
KODE
URAIAN PEKERJAAN JUMLAH (Rp.) KETERANGAN
ANALISA
1 2 3 4
J.4 Memasang 1 buah urinoir 825,750.00
J.5 Memasang 1 buah wastafel 1,647,250.00
J.6 Memasang 1 buah bak mandi fibreglass vol. 0,3 m³ 922,340.00
J.7 Memasang 1 buah bak mandi fibreglass vol. 1 m³ 1,461,004.00
J.8 Memasang 1 buah bak mandi batu bata vol. 0,3 m³ + porselin 11 cm x 11 cm 12,592,500.00
J.9 Memasang 1 buah bak mandi batu bata vol. 0,3 m³ + keramik 10 cm x 20 cm 12,316,179.60
J.10 Memasang 1 buah bak beton vol. 1 m³ air dengan keramik 10 cm x 20 cm 49,704,877.54
J.11 Memasang 1 buah bak beton vol. 1 m³ air dengan porselin 11 cm x 11 cm 51,219,424.70
J.12 Memasang 1 buah bathtub (non SNI) 2,136,375.00
J.13 Memasang 1 m' pipa beton ø 15 cm - 20 cm 644,345.00
J.14 Memasang 1 m' pipa beton ø 30 cm - 100 cm 1,804,325.00 Harga satuan
J.15 Memasang 1 bh bak kontrol pas. batu bata uk. 30 cm x 30 cm, tinggi 35 cm 4,585,967.50 tidak termasuk PPN
J.16 Memasang 1 bh bak kontrol pas. batu bata uk. 45 cm x 45 cm, tinggi 50 cm 7,378,185.00
J.17 Memasang 1 bh bak kontrol pas. batu bata uk. 60 cm x 60 cm, tinggi 65 cm 10,950,450.00
J.18 Memasang 1 m' pipa galvanis ø 1/2" 519,795.00
J.19 Memasang 1 m' pipa galvanis ø 3/4" 519,795.00
J.20 Memasang 1 m' pipa galvanis ø 1" 519,795.00
J.21 Memasang 1 m' pipa galvanis ø 1,5" 533,016.00
J.22 Memasang 1 m' pipa galvanis ø 2" 533,016.00
J.23 Memasang 1 m' pipa galvanis ø 4" 540,724.50
J.24 Memasang 1 m' pipa PVC tipe AW ø 1/2" 62,112.00
J.25 Memasang 1 m' pipa PVC tipe AW ø 3/4" 71,832.00
J.26 Memasang 1 m' pipa PVC tipe AW ø 1" 83,172.00
J.27 Memasang 1 m' pipa PVC tipe AW ø 1,5" 130,152.00
J.28 Memasang 1 m' pipa PVC type AW ø 3" 146,196.00
J.29 Memasang 1 m' pipa PVC type AW ø 4" - 6" 440,961.48
J.30 Memasang 1 bh kran air ø 3/4" atau 1/2" 52,009.93
J.31 Memasang 1 bh floor drain 40,800.00
J.32 Memasang 1 bh tempat sabun keramik (non SNI) 87,355.00
J.33 Memasang 1 bh septic tank, volume air 1 m³ (non SNI) 59,785,113.59
J.34 Memasang 1 bh septic tank, volume air 1,5 m³ (non SNI) 89,686,690.38
J.35 Memasang 1 bh septic tank, volume air 2 m³ (non SNI) 119,250,417.57
J.36 Memasang 1 bh Peresapan, dalam 5 m' 1,063,497.36

K. ANALISA BIAYA PEKERJAAN CAT DAN TALANG

K.1 1 m² Mengecat tembok baru (1 lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup) 19,232.30
K.2 1 m² Mengecat bidang kayu baru (1lapis plamir, 1 lapis cat dasar , 2 lapis cat penutup) 36,141.25
K.3 1 m² Mengecat Genteng 35,933.08
K.4 1 m² Mengeter 1X rangka kayu 37,045.00
K.5 1 m² Mengeter rangka kayu 37,315.00
K.6 1 m² Mengapur dinding baru 16,828.00
K.7 1 m² Memeni besi 2X 26,572.50
K.8 1 m' Pasang talang datar, seng BJLS 27 109,210.13
K.9 1 m' Pasang talang miring, seng BJLS 27 95,134.00
K.10 1 m' Pasang talang 1/2 lingkaran ø 10 cm, seng BJLS 27 89,570.00
K.11 1 m² Mengecat bidang kayu lama 33,872.13
K.12 1 m² Mengecat tembok lama ( 1 lapis cat dasar , 2 lapis cat penutup) 15,948.40
K.13 1 m² Mengikis /mengerok permukaan cat tembok lama 19,050.00
K.14 1 m² Mendempul dan menggosok kayu 11,843.00
K.15 1 m² Mengerok karat cat lama permukaan baja/besi dengan cara manual 15,950.00
K.16 1 m² Menyabun permukaan tembok lama 15,950.00
K.17 1 m² Pelaburan bidang kayu dengan politur 76,307.60
K.18 1 m² Pelaburan bidang kayu dengan vernis 39,802.00

L. ANALIAS BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN KERAMIK

L.1 1 m² Pasangan lantai keramik 10 cm x 20 cm 1,190,864.00


L.2 1 m² Pasangan lantai keramik 15 cm x 15 cm 1,190,864.00
L.3 1 m² Pasangan lantai keramik 20 cm x 20 cm 1,227,755.00
L.4 1 m² Pasangan lantai keramik 20 cm x 25 cm 1,237,755.00
L.5 1 m² Pasangan lantai keramik 10 cm x 20 cm 1,190,864.00
L.6 1 m² Pasangan lantai keramik 30 cm x 30 cm 1,207,455.00
L.7 1 m² Pasangan lantai keramik 40 cm x 40 cm 1,218,055.00
L.8 1 m² Pasangan lantai ubin granito 40 cm x 40 cm 911,120.00
L.9 1 m² Pasangan lantai ubin granito 30 cm x 30 cm 932,907.50
L.10 1 m' Pasangan plint ubin granito 10 cm x 40 cm 143,665.00
L.11 1 m' Pasangan plint ubin granito 10 cm x 30 cm 274,314.00
L.12 1 m' Pasangan plint keramik 10 cm x 20 cm 177,010.00
L.13 1 m' Pasangan plint keramik 10 cm x 15 cm 176,016.00
L.14 1 m' Pasangan plint keramik 10 cm x 20 cm 177,010.00
L.15 1 m' Pasangan plint keramik 10 cm x 40 cm 172,760.00
L.16 1 m² Pasangan dinding dengan keramik 10 cm x 20 cm 1,049,925.00
L.17 1 m² Pasangan dinding keramik 20 cm x 25 cm 1,051,500.00
L.18 1 m² Pasangan dinding keramik 20 cm x 20 cm 1,011,925.00
L.19 1 m² Pasangan dinding batu paras 1,323,490.00
L.20 1 m² Pasangan dinding batu tempel hitam 1,539,965.00
L.21 1 m² Pasangan plint kayu 10 x 20 cm 31,650.00
L.22 1 m² Pasangan lantai dari conblock, tebal 6 cm 46,366.00
KODE
URAIAN PEKERJAAN JUMLAH (Rp.) KETERANGAN
ANALISA
1 2 3 4
M. ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI, ALUMUNIUM DAN KACA

M.1 1 kg Pasang rangka atap baja 21,259.40


M.2 1 m² Pasang pintu besi 665,025.00
M.3 1 m² Pasang jendela besi 621,325.00
M.4 1 m² Pasang pintu besi lipat 1,101,425.00
M.5 1 m² Pasang pintu sunscreen alumunium 171,300.00
M.6 1 m² Pasang rolling door 678,725.00
M.7 1 m² Pasang kusen pintu / jendela alumunium biasa 831,025.00
M.8 1 m² Pasang pintu alumunium biasa 2,575,225.00
M.9 1 m² Pasang daun pintu alumunium dengan kaca rayband 12 mm 3,157,675.00
M.10 1 m² Pasang venetion blinds 72,975.00
M.11 1 m² Pasang vertical blinds 78,225.00
M.12 1 m² Pasang teralis besi 575,670.00
M.13 1 m² Pasang kawat harmonika, dengan rangka kayu kelas III 144,325.00
M.14 1 m² Pasang kawat nyamuk, dengan rangka kayu kelas III 51,200.00
M.15 1 m² Pasang kawat kassa, dengan rangka kayu kelas III 45,325.00
M.16 1 m² Pasang kawat burung, dengan rangka kayu kelas III 49,175.00
M.17 1 m² Pasang kaca rayband tebal 10 mm 503,205.00
M.18 1 m² Pasang jendela nako (dengan kaca dan teralis besi) 305,918.75
M.19 1 m² Pasang kaca bening tebal 3 mm 281,842.50
M.20 1 m² Pasang kaca bening tebal 5 mm 316,975.00
M.21 1 m² Pasang kaca bening tebal 8 mm 19,552.50
M.22 1 m² Pasang kaca buram, tebal 12 mm 508,355.00
M.23 1 m² Pasang kaca cermin tebal 5 mm 199,275.00
M.24 1 m² Pasang kaca cermin tebal 6 mm 235,312.50
M.25 1 m² Pasang kaca cermin tebal 8 mm 308,132.50
M.26 1 m² Pasang kaca wireglass tebal 5 mm 979,902.50
M.27 1 m² Pasang kaca patri tebal 5 mm 2,369,422.50

N. ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI, ENGSEL DAN KAIT

N.1 1 Buah pasang kunci tanam antik 221,370.00


N.2 1 Buah pasang kunci tanam 184,700.00
N.3 1 Buah pasang kunci tanam kamar mandi 114,650.00
N.4 1 Buah pasang kunci silinder 235,347.50
N.5 1 Buah pasang engsel pintu/jendela 3" 32,842.50
N.6 1 Buah pasang engsel pintu/jendela 4" 38,142.50
N.7 1 Buah pasang engsel pintu/jendela 5" 46,042.50
N.8 1 Buah pasang kait angin biasa 46,842.50
N.9 1 Buah pasang kait angin istimewa 34,642.50
N.10 1 Buah pasang door closer 2,415,775.00
N.11 1 Buah pasang kunci slot 100,290.00
N.12 1 Buah pasang pegangan pintu/door holder 147,775.00
N.13 1 Buah pasang door stop 100,195.00
N.14 1 Buah pasang rel pintu dorong 291,970.00
N.15 1 Buah pasang kunci lemari 70,337.50

O. ANALISA PEKERJAAN KUSEN PINTU & JENDELA ALUMINIUM


O.1 Memasang 1 Unit Pintu Type PD1(Pintu Utama) 39,297,500.00
O.2 Memasang 1 Unit Pintu type PD2 3,843,700.00
O.3 Memasang 1 Unit Pintu type P1 3,941,700.00
O.4 Memasang 1 Unit Pintu type P2 3,645,300.00
O.5 Memasang 1 Unit Pintu type P2a 2,610,700.00
O.6 Memasang 1 Unit Pintu type PJ1 3,316,800.00
O.7 Memasang 1 Unit Pintu type PVC 463,200.00
O.8 Memasang 1 Unit Pintu type J1 3,618,000.00
O.9 Memasang 1 Unit Pintu type J6 3,518,500.00
O.10 Memasang 1 Unit Pintu type BV 538,500.00
O.11 Memasang 1 Unit Jendela type J7 13,145,700.00
O.12 Memasang 1 Unit Pintu type P2 4,709,100.00
O.13 Memasang 1 Unit Pintu type P3 ( MUSHOLA) 3,675,500.00
O.14 Memasang 1 Unit Pintu type P4 2,694,200.00
O.15 Memasang 1 Unit Pintu type PJ1 7,546,400.00
O.16 Memasang 1 Unit Jendela type J8 1,330,400.00
O.17 Memasang 1 Unit Jendela type BV-2 ( MUSHOLA) 2,091,600.00
O.18 Memasang 1 Unit Jendela type BV-3( MUSHOLA) 1,343,400.00
O.19 Memasang 1 Unit Pintu type PJ1 ( ATM) 9,672,500.00
O.20 Memasang 1 Unit Pintu type PJ2 ( ATM) 12,042,500.00
O.21 Memasang 1 Unit Jendela type J-1( ATM) 19,404,500.00
O.22 Memasang 1 Unit Jendela type J-2( ATM) 12,469,000.00
O.23 Memasang 1 Unit Pintu type PJ3 ( ATM) 14,205,300.00
O.24 Memasang 1 Unit Jendela type J-1( LOKET) 3,713,700.00
O.25 Memasang 1 Unit Pintu type PJ1 ( MESS) 4,288,200.00
O.26 Memasang 1 Unit Pintu type J1 ( MESS) 3,635,600.00
O.27 Memasang 1 Unit Jendela type BV-1 ( MESS) 1,738,500.00
O.28 Memasang 1 M2 Pasang Partisi Toilet lapis Melamik 295,700.00
O.29 Memasang 1 M1 Railling Tangga lengkap 731,700.00
REKAPITULASI
RENCANA ANGGARAN BIAYA
PENYUSUNAN DED GELANGGANG OLAHRAGA (GOR)
KABUPATEN PULAU MOROTAI
TAHUN ANGGARAN 2017

SUB TOTAL
NO URAIAN PEKERJAAN
(RP.)
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN STANDARD
A. PEKERJAAN STRUKTUR 24,762,087,665.84
C. PEKERJAAN ATAP 377,914,297.78
D. PEKERJAAN ARSITEKTUR 6,395,942,602.78
E. PEKERJAAN MEKANIKAL & SANITARY 447,393,309.92
F. PEKERJAAN ELEKTRIKAL 441,377,200.59
TOTAL PEKERJAAN STANDARD
III. PEKERJAAN NON STANDARD
A. BANGUNAN GENSET & RUMAH POMPA 120,083,124.19
B. PEKERJAAN PAGAR SAMPING DAN BELAKANG 2,625,927,692.52
C. PEK. PAGAR DEPAN, GERBANG & PAPAN NAMA 338,098,747.45
D. PEK. SARANA PARKIR ,SALURAN & TAMAN 387,342,462.70
E. PEK. ELEKTRIKAL NON STANDARD 211,014,865.30
F. PEK. MEKANIKAL NON STANDARD 60,555,400.00
TOTAL PEKERJAAN NON STANDARD
IV. PEKERJAAN BANGUNAN PENDUKUNG
A. PEK. PEMBUATAN POS JAGA (3 Unit) 134,603,692.44
B. PEK. PEMBANGUNAN MUSHOLA & KANTIN 754,392,059.77
C. PEK. RUANG CETAK PLAT & R.PENJAGA KANTOR 284,105,743.42
TOTAL PEKERJAAN BANGUNAN PENDUKUNG
JUMLAH TOTAL
PPN (10%)
JUMLAH + PPN
DIBULATKAN
Terbilang :

# TUJUH MILYAR RUPIAH #

Pangkalpinang, 23 Desember 2009


Dibuat Oleh
Konsultan Perencana
CV. Gunung Kencana

……………………..
Direktur utama
RINCIAN
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG KANTOR SAMSAT BANGKA BELITUNG
KOTA PANGKAL PINANG
TAHUN ANGGARAN 2009

NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN


(RP.)
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran kembali lokasi site 2,013.40 m2 1,000.00
2 Pek. Pembersihan Lokasi Site 2,013.40 m2 10,450.00
3 Pek. Pemasangan Pagar Sementara keliling site plan 292.93 m1 2,495,640.63
4 Pek. Pembuatan Kantor Direksikeet 24.00 m2 #N/A
5 Pek. Pengadaan Air & Listrik kerja 1.00 Ls 2,500,000.00
6 Pek. Pembersihan sisa bekas pekerjaan 1.00 Ls 1,000,000.00
7 Biaya Perijinan ( IMB ) 1,560.00 m2 25,000.00
TOTAL PERSIAPAN
II. PEKERJAAN STANDARD
A. PEKERJAAN STRUKTUR
I. PEKERJAAN GALIAN & URUGAN
1 Pek. Pasang Papan Bouplank 98.84 m1 56,969.42
2 Pek. Galian Tanah Pondasi Plat Setempat 41.04 m3 57,280.00
3 Pek. Galian Tanah Sloof 20/30 50.82 m3 43,600.00
4 Pek. Galian Tanah Pondasi Batu kali menerus 33.88 m3 43,600.00
5 Pek. Urugan Pasir Bawah Pondasi Plat & Sloof t=10cm 10.54 m3 570,900.00
6 Pek. Urugan Pasir Bawah Pondasi batu kali t=10cm 2.71 m3 570,900.00
7 Pek. Urugan Tanah Kembali bks Galian 75.17 m3 20,910.00
8 Pek. Urugan Tanah Peninggian Bangunan t=40 cm(Tanah dari luar) 198.79 m3 122,700.00
9 Pek. Urugan Tanah Peninggian Bangunan (Tanah bks galian) 108.90 m3 20,910.00
JUMLAH - I
II. PEKERJAAN PONDASI, POER & SLOOF 63
1 Pek. Aanstamping Batukali 4.07 m3 858,825.00
2 Pek. Pondasi Batu kali camp. 1Pc:4Psr 10.67 m3 15,023,850.00
3 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 49.02 m2 1,009,452.88
4 Pekerjaan Beton Pondasi Plat Type P-1 (1,00X1,00X0,40)m 0.35 m3 33,543,333.10
5 Pekerjaan Beton Pondasi Plat Type P-2 (1,25X1,25X0,40)m 4.73 m3 33,543,333.10
6 Pekerjaan Beton Pondasi Plat Type P-3 (1,50X1,50X0,40)m 17.33 m3 33,543,333.10
7 Pekerjaan Beton Pondasi Tangga (1,00X1,50X35)m 0.66 m3 33,543,333.10
8 Pekerjaan Beton Dinding Pedestal Tangga ,t=15cm 0.32 m3 59,044,929.06
9 Beton Sloof SL1 20/40 23.18 m3 35,241,446.60
10 Beton Sloof SL2 15/25 1.27 m3 33,774,994.42
JUMLAH - II

III. PEKERJAAN BETON LANTAI BAWAH


1 Pekerjaan kolom Beton K1-40/40,Beton K-225,tulangan 108,05 kg/m3 22.40 m3 87,984,658.35
2 Pekerjaan kolom Beton K2-30/30,Beton K-225,tulangan 184,19 kg/m3 1.26 m3 4,538,000.00
3 Pek Beton Kolom Praktis KP 11/11, Beton K.175,tulangan 168,57 kg/m3 182.00 m' 458,305.78
4 Pek. Beton Balok B1 30/60 cm, Elevasi +4,20,Beton K-225,tulangan 151,84 kg/m3 44.60 m3 63,635,738.67
5 Pek. Beton Balok B2 25/50 cm, Elevasi +4,20,Beton K-225,tulangan 177,78 kg/m3 12.08 m3 63,635,738.67
6 Pek. Beton Balok Bordes Tangga B4 20/30 cm, Elv. +1,80,K-225,tulangan.232,21 kg/m3 0.25 m3 63,635,738.67
7 Pek.Beton Plat Lantai t=12 cm , Elevasi +4,10, 68.74 m3 117,434,378.18
8 Pek.Beton Plat Dak t=10 cm , Elevasi +4,20,Beton K-225 4.67 m3 33,774,994.42
9 Pek Beton Plat , Step Tangga -(2 Unit) ,Beton K-225 2.61 m3 117,434,378.18
10 Pek.Beton Plat Bordes Tangga t=12 cm (2 Unit),Beton K-225 0.76 m3 117,434,378.18
11 Pek Beton Balok Lintle Kusen, Beton K.175 34.36 m' 609,315.70
12 Pek Beton Luifel Jendela t= 10 cm, Beton K.175 1.22 m3 116,680,196.93
13 Pek Beton Meja Wasstafel t=10 cm, Beton K.175 0.19 m3 116,680,196.93
JUMLAH - III
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5

IV. PEKERJAAN BETON LANTAI ATAS


1 Pekerjaan Beton Kolom K1-40/40,Beton K-225 16.78 m3 87,984,658.35
2 Pekerjaan kolom Beton K2-30/30,Beton K-225 1.46 m3 4,538,000.00
3 Pek Kolom Praktis KP 15/15, Beton K.175 314.69 m' 458,305.78
4 Pek. Beton Balok B1 - 30/60 cm, Elevasi +8,56 9.07 m3 63,635,738.67
5 Pek. Beton Balok B3 - 20/40 cm, Elevasi +8,56 1.66 m3 63,635,738.67
6 Pek. Beton Balok BL - 10/40 cm, Elevasi +8,56 1.01 m3 63,635,738.67
7 Pek. Beton Plat Dak Atap t=10 cm,Elv. + 8,56 8.66 m3 116,680,196.93
8 Pek. Beton Balok B1 - 30/60 cm, Elevasi +9,56 2.10 m3 63,635,738.67
9 Pek. Beton Balok B2 - 25/50 cm, Elevasi +9,56 2.10 m3 63,635,738.67
10 Pek. Beton Balok B3 - 20/40 cm, Elevasi +9,56 0.67 m3 63,635,738.67
11 Pek. Beton Balok B4 - 20/30 cm, Elevasi +9,56 9.27 m3 63,635,738.67
12 Pek. Beton Balok BL - 10/40 cm, Elevasi +9,56 4.17 m3 63,635,738.67
13 Pek. Beton Plat Dak Atap t=10 cm,Elv. + 9,56 30.29 m3 116,680,196.93
14 Pekerjaan kolom Beton K2-30/30,Elv. + 9,56,Beton K-225 1.39 m3 4,538,000.00
15 Pek. Beton Balok RB1 - 15/30 cm, Elevasi +10,56 2.76 m3 63,635,738.67
16 Pek Beton Luifel Jendela t= 10 cm, Beton K.175 0.66 m3 116,680,196.93
17 Pek Beton Meja Wasstafel t=10 cm, Beton K.175 0.11 m3 116,680,196.93
JUMLAH - IV -
SUB TOTAL STRUKTURE
C. PEKERJAAN ATAP
1 Pekerjaan Kuda-kuda & Rangka atap Baja Ringan "Zinkalum" 683.13 m2 250,000.00
2 Pasang Glasswoll 683.13 m2 25,000.00
3 Pasang Aluminium Foil 683.13 m2 119,490.00
4 Penutup atap Metal roof 683.13 m2 129,396.00
5 Bubung Metal Roof 83.42 m' 132,485.00
6 Lisplang Plat GRC Lbr.30cm tebat 12 mm 112.26 m' 80,000.00
SUB TOTAL ATAP

D. PEKERJAAN ARSITEKTUR
I. PEKERJAAN DINDING & PLESTERAN
I.a LANTAI BAWAH
1 Pasangan dinding 1/2 bata 1 : 2 268.25 m2 1,922,000.00
2 Pekerjaan plester dan acian dinding 1 : 2 536.49 m2 777,545.00
3 Pasangan dinding 1/2 bata 1 : 5 168.37 m2 1,127,930.00
4 Pekerjaan plester dan acian dinding 1 : 5 336.73 m2 418,595.00
5 Pekerjaan plester dan acian Profil Tali air dinding 49.91 m1 6,500.00
6 Pekerjaan plester dan acian Ban-banan dinding 296.80 m1 15,000.00
7 Pekerjaan Pasang dinding Batu alam Andesit 14.15 m2 350,000.00
8 Pekerjaan dinding keramik 20X25 h= 2m 99.82 m2 1,051,500.00
9 Pekerjaan Border dinding keramik 10X20 49.91 m' 25,000.00
10 Pekerjaan Plin dinding Kayu L=10 cm (Partisi) 146.46 m' 103,500.00
11 Pekerjaan Railling Tangga (Depan & Belakang ) Pipa Stainlesstel 40.15 m' 750,000.00
SUB JUMLAH
II.b LANTAI ATAS
1 Pasangan dinding 1/2 bata 1 : 2 58.07 m2 1,922,000.00
2 Pekerjaan plester dan acian dinding 1 : 2 116.13 m2 777,545.00
3 Pasangan dinding 1/2 bata 1 : 5 562.57 m2 1,127,930.00
4 Pekerjaan plester dan acian dinding 1 : 5 1,125.15 m2 418,595.00
5 Pekerjaan plester dan acian Profil Tali air dinding 37.19 m1 6,500.00
6 Pekerjaan plester dan acian Ban-banan dinding 126.00 m1 15,000.00
7 Pekerjaan Pasang dinding Batu alam Andesit 4.48 m2 350,000.00
8 Pekerjaan dinding keramik 20X25 h= 2m 74.38 m2 1,051,500.00
9 Pekerjaan Border dinding keramik 10X20 37.19 m' 25,000.00
SUB JUMLAH
JUMLAH - I
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5

II. PEK. KUSEN PINTU/JENDELA & PARTISI, LENGKAP ASSESORIES


II.a LANTAI BAWAH
1 Pasang Kusen+Pintu Type PD1(Pintu Utama) 2.00 Unit 39,297,500.00
2 Pasang Kusen+Pintu Type PD2 3.00 Unit 3,843,700.00
3 Pasang Kusen+Pintu Type P1 15.00 Unit 3,941,700.00
4 Pasang Kusen+Pintu Type P2 7.00 Unit 3,645,300.00
5 Pasang Kusen+Pintu Type P3 8.00 Unit 2,610,700.00
6 Pasang Kusen+jendela Type J1 20.00 Unit 3,618,000.00
7 Pasang Kusen+jendela Type J6 2.00 Unit 3,618,000.00
8 Pasang Kusen+jendela Type J7 8.00 Unit 3,618,000.00
9 Pasang Kusen+jendela Type J8 3.00 Unit 3,518,500.00
8 Pasang Kusen+jendela Type BV1 2.00 Unit 3,618,000.00
SUB JUMLAH
II.b LANTAI ATAS
1 Pasang Kusen+Pintu Type PD2 3.00 Unit 3,843,700.00
2 Pasang Kusen+Pintu Type P1 13.00 Unit 3,941,700.00
3 Pasang Kusen+Pintu Type P2 8.00 Unit 3,645,300.00
4 Pasang Kusen+Pintu Type P3 8.00 Unit 2,610,700.00
5 Pasang Kusen+jendela Type J1 20.00 Unit 3,618,000.00
6 Pasang Kusen+jendela Type J7 8.00 Unit 3,618,000.00
7 Pasang Kusen+jendela Type BV1 2.00 Unit 538,500.00
SUB JUMLAH
JUMLAH - II

III. PEKERJAAN PLAFOND


III.a LANTAI BAWAH
1 Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40 573.00 m2 250,000.00
2 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Toilet+KM) 42.98 m2 245,000.00
3 Pekerjaan profil gipsum 301.50 m' 13,000.00
4 Pekerjaan profil kayu 71.40 m' 13,500.00
SUB JUMLAH
III.b LANTAI ATAS
1 Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40 589.50 m2 250,000.00
2 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Toilet+KM) 31.50 m2 245,000.00
3 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Overstek atap) 31.50 m2 245,000.00
4 Pekerjaan profil gipsum 390.00 m' 13,000.00
5 Pekerjaan profil kayu 39.00 m' 13,500.00
SUB JUMLAH
JUMLAH - III
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5

IV. PEKERJAAN LANTAI


IV.a LANTAI BAWAH
1 Urugan pasir bawah lantai t=10 cm 117.16 m3 570,900.00
2 Lantai kerja t = 5 cm 3.54 m2 1,009,452.88
3 Pekerjaan lantai keramik 40X40 ( Diagonal) 183.15 m2 1,218,055.00
4 Pekerjaan lantai keramik 40X40 ( Border Diagonal) 8.88 m2 1,278,957.75
5 Pekerjaan Border Lantai List Pinggir 20X40 (Warna Coklat) 10.27 m2 1,278,957.75
6 Pekerjaan lantai keramik 40X40 595.24 m2 1,218,055.00
7 Pekerjaan lantai keramik 40X40 (Tangga) 117.37 m2 1,218,055.00
8 Pekerjaan Plin lantai keramik 10X40 743.10 m' 172,760.00
9 Pekerjaan lantai keramik KM 20X20 59.94 m2 1,227,755.00
10 Pekerjaan Step Nozing tangga 39.54 m' 172,760.00
11 Pek. Lantai Rabat t = 5 cm (Keliling Bangunan) 0.93 m2 1,009,452.88
SUB JUMLAH
IV.b LANTAI ATAS
1 Urugan pasir bawah lantai t=10 cm 70.76 m3 570,900.00
2 Pekerjaan lantai keramik 40X40 ( Diagonal) 183.15 m2 1,278,957.75
3 Pekerjaan Border Lantai List Pinggir 10X40 10.27 m2 1,278,957.75
4 Pekerjaan lantai keramik 40X40 595.24 m2 1,218,055.00
5 Pekerjaan Plin lantai keramik 10X40 699.86 m' 172,760.00
6 Pekerjaan lantai keramik KM 20X20 49.95 m2 1,227,755.00
SUB JUMLAH
JUMLAH - IV

V. PEKERJAAN FINISHING & PENGECATAN


V.a LANTAI BAWAH
1 Pekerjaan Finishing Opening Kusen pada dinding bata 665.21 m1 7,500.00
2 Pekerjaan pengecatan dinding Exterior Watershiel 215.75 m2 24,040.38
3 Pekerjaan pengecatan dinding bata & partisi (Interior) 873.22 m2 19,232.30
4 Pekerjaan pengecatan plafond 574.91 m2 19,232.30
5 Pekerjaan pengecatan politur Daun pintu Lapis Teakwood 15.54 m2 76,307.60
SUB JUMLAH SUB JUMLAH
V.b LANTAI ATAS
1 Pekerjaan Finishing Opening Kusen pada dinding bata 735.21 m1 7,500.00
2 Pekerjaan pengecatan dinding Exterior Watershiel 201.06 m2 24,040.38
3 Pekerjaan pengecatan dinding bata & partisi (Interior) 1,241.28 m2 19,232.30
4 Pekerjaan pengecatan plafond 609.00 m2 19,232.30
5 Pekerjaan pengecatan politur Daun pintu Lapis Teakwood 15.54 m2 76,307.60
6 Pekerjaan pengecatan lisplang kayu 34.67 m2 36,141.25
SUB JUMLAH
JUMLAH - V
SUB TOTAL ARSITEKTURE
E. PEKERJAAN MEKANIKAL & SANITARY
I PEKERJAAN INSTALASI AIR BERSIH
1. LANTAI - 1
a. PIPA AIR BERSIH (PPR PN 16)
- PPR dia 1/2 inc 177.60 m 519,795.00
- PPR dia 3/4 inc 92.50 m 519,795.00
- PPR dia 1 inc 37.00 m 519,795.00
b. Valve (Class 125 psi)
- Gate valve dia 3/4 inc 1.00 unit 100,000.00
- Gate valve dia 1 inc 2.00 unit 160,000.00
SUB JUMLAH
2. LANTAI - 2
a. PIPA AIR BERSIH (PPR PN 16)
- PPR dia 1/2 inc 83.25 m 519,795.00
- PPR dia 3/4 inc 37.00 m 519,795.00
- PPR dia 1 inc 9.25 m 519,795.00
b. Valve (Class 125 psi)
- Gate valve dia 3/4 inc 1.00 unit 100,000.00
- Gate valve dia 1 inc 2.00 unit 160,000.00
SUB JUMLAH
JUMLAH - I
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5
II. PEKERJAAN INSTALASI AIR KOTOR
1. LANTAI - 1
c. PIPA AIR KOTOR (PVC Class 10 kg/cm2)
- PVC dia 2 inc 74.00 m 130,152.00
- PVC dia 3 inc 55.50 m 146,196.00
- PVC dia 4 inc 194.25 m 374,817.26
- PVC dia 6 inc 37.00 m 440,961.48
SUB JUMLAH
2. LANTAI - 2
c. PIPA AIR KOTOR (PVC Class 10 kg/cm2)
- PVC dia 2 inc 66.60 m 130,152.00
- PVC dia 3 inc 18.50 m 146,196.00
- PVC dia 4 inc 74.00 m 374,817.26
SUB JUMLAH
JUMLAH - II
III. PEKERJAAN SANITARY
a. LANTAI BAWAH
1 Floor drained "TOTO" 9.00 bh 40,800.00
2 Kran air 1/2" 10.00 bh 52,009.93
3 Closet Duduk "TOTO" 6.00 bh 2,624,729.00
4 Urinoir U57M "TOTO" 3.00 bh 825,750.00
5 Sekat Urinoir Porselin "TOTO" 3.00 bh 350,000.00
6 Washtafel Bulat + Accecories "TOTO" 4.00 bh 1,647,250.00
SUB JUMLAH
b. LANTAI ATAS
1 Floor drained "TOTO" 16.00 bh 40,800.00
2 Kran air 1/2" 10.00 bh 52,009.93
3 Closet Duduk "TOTO" 9.00 unit 2,624,729.00
4 Urinoir U57M "TOTO" 6.00 bh 825,750.00
5 Sekat Urinoir Porselin "TOTO" 6.00 bh 350,000.00
6 Washtafel Bulat + Accecories "TOTO" 7.00 unit 1,647,250.00
7 Bak. Kitchen zing lengkap meja beton+keramik 1.00 unit 3,500,000.00
SUB JUMLAH
JUMLAH - III
SUB TOTAL PEK.MEKANIKAL STANDARD & SANITARY
F. PEKERJAAN ELEKTRIKAL
I. ELEKTRIKAL LANTAI DASAR
1. PEMASANGAN PANEL
a PP-D/LP-D
- Panel box (800x600x250) mm 1.00 bh 2,750,000.00
- Busbar+Wiring Material 1.00 lot 1,950,000.00
Input
- MCCB 3P 32 A 1.00 bh 325,000.00
- Pilot Lamp Tlmq+MCB 1P 2A 3.00 set 80,500.00
Output
- MCB 1P 6A 12.00 bh 70,000.00
- MCB 1P 16A 6.00 bh 70,000.00
- MCB 3P 6A 1.00 bh 285,000.00
b SDP
- Panel box (800x600x250) mm 1.00 bh 2,750,000.00
- Busbar+Wiring Material 1.00 lot 1,950,000.00
Input
- MCB 3P 80 A 1.00 bh 825,000.00
- Pilot Lamp Tlmq+MCB 1P 2A 3.00 set 80,500.00
Output
- MCB 3P 32A 4.00 bh 325,000.00
SUB JUMLAH
2 PASANG KABEL TRAY
kabel tray elektrikal (300 x 50) mm 38.00 m 222,000.00
kabel ladder elektrikal (300 x 100) mm 5.00 m 218,000.00
SUB JUMLAH
3 PASANG GROUNDING SYSTEM
Grounding system max. 2 Ohm + Box Control 1.00 titik 2,950,000.00
SUB JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5
4 PEMASANGAN INSTALASI PENERANGAN/LAMPU
1 Installasi
RM TL 2x36 W 41.00 titik 196,260.22
Down Light 14 W 23.00 titik 196,260.22
Down Light 18 W 35.00 titik 196,260.22
Baret Lamp 20 W 9.00 titik 196,260.22
stop kontak 25.00 titik 225,699.25
2 Material
RM TL 2x36 W 41.00 bh 422,600.00
Down Light 14 W 23.00 bh 350,000.00
Down Light 18 W 35.00 bh 315,000.00
Baret Lamp 20 W 9.00 bh 375,000.00
Stop kontak 25.00 bh 24,100.00
Saklar ganda 19.00 bh 24,100.00
Saklar tunggal 21.00 bh 18,100.00
SUB JUMLAH
JUMLAH - I
II. ELEKTRIKAL LANTAI ATAS
1 PEMASANGAN PANEL
a PP-ATAS/LP-ATAS
- Panel box (800x600x250) mm 1.00 bh 2,750,000.00
- Busbar+Wiring Material 1.00 lot 1,950,000.00
Input
- MCCB 3P 32 A 1.00 bh 325,000.00
- Pilot Lamp Tlmq+MCB 1P 2A 3.00 set 80,500.00
Output -
- MCB 1P 6A 11.00 bh 70,000.00
- MCB 1P 16A 6.00 bh 70,000.00
- MCB 3P 6A 1.00 bh 285,000.00
SUB JUMLAH
5 PASANG KABEL TRAY
kabel tray elektrikal (300 x 50) mm 38.00 m 222,000.00
kabel ladder elektrikal (300 x 100) mm 5.00 m 218,000.00
SUB JUMLAH
7 PEMASANGAN INSTALASI PENERANGAN/LAMPU LT.ATAS
1 Installasi
RM TL 2x36 W 41.00 titik 196,260.22
Down Light 14 W 15.00 titik 196,260.22
Down Light 18 W 21.00 titik 196,260.22
Baret Lamp 20 W 9.00 titik 196,260.22
stop kontak 25.00 titik 225,699.25
2 Material
RM TL 2x36 W 41.00 bh 422,600.00
Down Light 14 W 15.00 bh 350,000.00
Down Light 18 W 21.00 bh 315,000.00
Baret Lamp 20 W 9.00 bh 375,000.00
Stop kontak 25.00 bh 24,100.00
Saklar ganda 19.00 bh 24,100.00
Saklar tunggal 21.00 bh 18,100.00
SUB JUMLAH
JUMLAH - II
III. PENANGKAL PETIR
Cable BC 50 mm2 225.00 m 65,000.00
Road Protection 4.00 bh 200,000.00
Installasi & accessories 4.00 titik 250,000.00
Grounding system max. 2 Ohm + Box Control 4.00 titik 2,950,000.00
JUMLAH - III
SUB TOTAL PEK. ELEKTRIKAL STANDARD
TOTAL JUMLAH PEKERJAAN GEDUNG
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5
III. PEKERJAAN NON STANDARD
A. BANGUNAN GENSET & RUMAH POMPA
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan Pek.Bouwplank 26.70 m1 56,969.42
Sub Jumlah I
II. PEKERJAAN TANAH
1 Pek.Galian Tanah Pondasi Menerus 3.56 m3 43,600.00
2 Pek.Urugan Tanah ( Tanah dari Luar ) 12.71 m3 30,250.00
3 Pek.Pasir Urug Bawah Pondasi t = 5 cm 0.82 m3 36,850.00
Sub Jumlah II
III. PEKERJAAN PASANGAN
1 Pek. Pas. Aanstamping 2.28 m3 858,825.00
2 Pek. Pas. Pondasi Batu Kali 1 : 4 5.13 m3 15,023,850.00
3 Pas. Pondasi Rollag Bata 4.65 m3 252,300.00
4 Pas. Pondasi Dudukan Genset 0.28 m3 3,377,810.00
5 Pas. Pasir Urug 26.00 m3 36,850.00
6 Pas. Lantai Kerja t = 3 cm 26.00 m3 223,640.00
7 Pas. Beton Rabat 1 : 3 : 5 16.73 m3 447,280.00
8 Pek. Slab Beton t= 10cm 1.13 m3 1,948,630.00
9 Pek. Sloof 15/20; 4D16 0.43 m3 3,342,580.00
10 Pas. Bata merah 1/2 Batu 1Pc : 5Ps 34.94 m2 53,380.00
11 Pek. Kolom 15/15 0.32 m3 4,326,860.00
12 Pek. Balok 15/20 0.16 m3 3,677,160.00
13 Pek. Plat beton t=10cm 2.57 m3 2,556,990.00
14 Pek. Listplang beton t=5cm; f 8 - 15 0.38 m3 2,556,990.00
15 Pas. Plesteran dan Acian 1Pc : 5Ps (Plat Dak) 25.73 m2 28,250.00
16 Pas. Waterproofing Plat Dak 25.73 m2 13,060.00
17 Pas. Plesteran dan Acian 1Pc : 5Ps 105.63 m2 20,770.00
Sub Jumlah III
IV. PEKERJAAN BESI
1 Pintu Plat besi 1/8" rangka besi siku50x50x5, kusen UNP 6,5 0.89 m2 665,025.00
2 Talang avoor pipa besi galvanis dia. 4" medium B 16.02 m1 28,380.00
3 Pek.pas. Kunci gembok 1.00 bh 20,000.00
Sub Jumlah IV
V. PEKERJAAN LAIN-LAIN
1 Pengecatan Tembok termasuk beton expose 101.95 m2 13,060.00
2 Pas. Titik Lampu 2.00 Ttk 195,000.00
3 Pas. Titik Kontak 1.00 Ttk 224,250.00
4 Pas. Armatur 1 x 25 Watt 1.00 bh 75,000.00
5 Pas. Lampu Pilot 1.00 bh 80,000.00
6 Pas. Saklar Ganda 1.00 bh 20,000.00
7 Pas. Exhaus Fan 1.00 Unit 250,000.00
8 BC 50 qmm 28.00 m1 25,000.00
9 Earthing Rood 16 x 2.500 mm 3.00 m1 25,000.00
10 Klem aerthing rood 3.00 bh 5,000.00
11 Pipa PVC 3" AW1 0.80 m1 17,880.00
12 Pembersihan Kembali Areal Kerja 1.00 Ls 100,000.00
Sub Jumlah V
Jumlah ( I + II + III + IV + V )
B. PEKERJAAN PAGAR SAMPING DAN BELAKANG 249.93 M1
I. PEKERJAAN GALIAN & URUGAN
1 Pekerjaan Pasang papan Bouwplank 99.97 m' 56,969.42
2 Pek. Galian Tanah 199.94 m³ 43,600.00
3 Pek. Urugan Pasir 19.99 m³ 570,900.00
4 Pek. Buangan Tanah Eks Galian 43.40 m³ 56,100.00
SUB JUMLAH
II. PEKERJAAN PONDASI & BETON
1 Pek. Aanstamping Batu Kali 29.99 m³ 858,825.00
2 Pek. Pasangan Batu Kali 1 : 4 (Sekaligus Dinding Saluran Jalan) 83.10 m³ 15,023,850.00
3 Pekerjaan Beton Sloof 15/20 7.50 m³ 33,774,994.42
4 Pekerjaan beton Kolom Praktis 15/15 210.78 m' 458,305.78
5 Pekerjaan Beton Balok Lintle 15/20 249.93 m' 609,315.70
SUB JUMLAH
III. PEKERJAAN DINDING & FINISHING
1 Pek. Pasangan Bata 1 : 5 499.86 m² 1,127,930.00
2 Pek. Plester dan Acian 1 : 5 (Dinding & Kolom) 499.86 m² 418,595.00
3 Pek. Plester dan Acian Kamprotan (bagian belakang) 499.86 m² 21,500.00
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5
4 Pek.Pasang besi siku L.50x50x5 (dudukan Kawat duri) 538.90 Kg 21,259.40
5 Pek. Pasang Kawat duri 5 baris kawat 2,140.60 m' 4,100.00
6 Pek. Pengecatan Dinding 856.24 m² 19,232.30
7 Pek. Pengecatan besi siku 21.56 m² 36,141.25
SUB JUMLAH
SUB TOTAL - C
C. PEK. PAGAR DEPAN, GERBANG & PAPAN NAMA 43.00 M1
I. PEKERJAAN GALIAN & URUGAN
1 Pekerjaan Pasang Bouwplank 17.20 m' 56,969.42
2 Pek. Galian Tanah 34.40 m³ 43,600.00
3 Pek. Urugan Pasir 3.44 m³ 570,900.00
4 Pek. Urugan Tanah Kembali 7.69 m³ 20,910.00
5 Pek. Buangan Tanah Eks Galian 37.91 m³ 56,100.00
SUB JUMLAH
II. PEKERJAAN PONDASI & BETON
1 Pek. Aanstamping Batu Kali 5.16 m³ 858,825.00
2 Pek. Pasangan Batu Kali 1 : 4 (Sekaligus Dinding Saluran Jalan) 14.30 m³ 15,023,850.00
3 Pek. Sloof Beton 15/20 1.29 m³ 33,774,994.42
4 Pek. Kolom Praktis 15/15 38.33 m' 458,305.78
5 Pek. Balok 15/20 43.00 m' 609,315.70
SUB JUMLAH
III. PEKERJAAN DINDING & FINISHING
1 Pek. Pasangan Bata (Dinding Pagar+Bungkus Kolom 15/15) 71.92 m² 70,000.00
2 Pek. Plester dan Acian (Dinding & Kolom) 143.84 m² 24,700.00
3 Pek. Plester dan Acian Profilan Kolom 129.60 m' 6,500.00
4 Pek. Pengecatan Dinding 143.84 m² 28,600.00
5 Pek.Pasang Dinding Keramik Granit 40x40 Polis "Indogress" 5.25 m2 238,100.00
6 Pek. Pintu Gerbang (Besi Hollow 40x40&20x40) lengkap 2.00 Unit 5,000,000.00
SUB JUMLAH
SUB TOTAL - C
D. PEK. SARANA PARKIR ,SALURAN & TAMAN
I. PEKERJAAN SALURAN & JEMBATAN
1 Pekerjaan Drainase Gravel U20cm+Pas Bata (Keliling Bangunan) 276.00 m' 160,500.00
2 Pekerjaan Drainase Gravel U20cm+Pas Bata (Saluran Kiri/Kanan/Belakang) 135.00 m' 160,500.00
3 Pekerjaan Drainase Tertutup Buist beton dia.30cm 81.00 m' 134,800.00
4 Pekerjaan Grill Tutup Saluran 94.80 m' 350,000.00
SUB JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5
II. PEKERJAAN JALAN & PEDESTRIAN
1 Pekerjaan Pembenrukan Badan Jalan 1,037.64 m3 21,000.00
2 Pekerjaan Lapisan Pondasi Bawah (LPB) t= 20 cm 1,037.64 m2 48,900.00
3 Pekerjaan Lapisan Pondasi Atas (LPA) t= 10 cm 1,037.64 m2 21,900.00
4 Pekerjaan Lapisan Penetrasi (Lapen) t=5 cm 1,037.64 m2 27,300.00
5 Pekerjaan Lapisan Hotmix (AS-WC) t=5 cm 1,037.64 m2 101,800.00
6 Pekerjaan Pedestrian Paving Block 6 cm Natural 70.38 m2 85,400.00
7 Pekerjaan Kansteen 399.19 m' 58,800.00
SUB JUMLAH
III. PEKERJAAN TIANG BENDERA & TAMAN
1 Pasang Tiang Bendera lengkap pondasi & Accessories 1.00 Ls 2,500,000.00
2 Pekerjaan Taman
- Urugan Tanah Subur 20 cm 46.65 m3 75,000.00
- Tanaman Rumput Gajah 233.25 m2 25,000.00
- Tanaman Pohon Soka 50.00 Tnmn 2,500.00
- Tanaman Pohon Palm Botol 6.00 Tnmn 65,000.00
- Tanaman Pohon Waru 21.00 Tnmn 35,000.00
- Tanaman Bougenvil 20.00 Tnmn 50,000.00
- Tanaman Pohon Bambu kecil 300.00 Tnmn 15,000.00
SUB JUMLAH
SUB TOTAL - D
E. PEK. ELEKTRIKAL NON STANDARD
I. PENYAMBUNGAN DAYA PLN
1 Beaya penyambungan (BP) dan Uang jaminan 1.00 Ls 65,430,465.30
langganan (UJL) untuk 42 kVA, beserta semua beaya
yang diperlukan untuk perijinan penyambungan daya
JUMLAH - I
II. PEKERJAAN PANEL AC
1 Panel PP-AC1
• Panel box (H) 600 x (W) 500 x (D) 400 mm 1.00 Bh 550,000.00
• MCCB in 3P, 100AF/63AT, 25kA 1.00 Bh 649,500.00
• MCB out 3P, 20A, 10 kA 9.00 Bh 300,000.00
• Pilot light 220 VAC c/w neon bulb & fuse 3.00 Bh 35,000.00
• Bare copper, 100A 1.00 set 550,000.00
• Instalasi 1.00 Ls 800,000.00
• Peralatan dan material bantu 1.00 Ls 800,000.00
Sub Jumlah
2 Panel PP-AC2
• Panel box (H) 600 x (W) 500 x (D) 400 mm 1.00 Bh 550,000.00
• MCCB in 3P, 100AF/63AT, 25kA 1.00 Bh 649,500.00
• MCB out 3P, 20A, 10 kA 9.00 Bh 300,000.00
• Pilot light 220 VAC c/w neon bulb & fuse 3.00 Bh 35,000.00
• Bare copper, 100A 1.00 set 550,000.00
• Instalasi 1.00 Ls 800,000.00
• Peralatan dan material bantu 1.00 Ls 800,000.00
Sub Jumlah
3 Panel PP-AB
• Panel box (H) 600 x (W) 500 x (D) 400 mm 1.00 Bh 550,000.00
• MCB in 3P, 25A, 10kA 1.00 Bh 622,000.00
• MCB out 3P, 10A, 10 kA 1.00 Bh 300,000.00
• MCB out 1P, 6A/10A, 6 kA 3.00 Bh 74,000.00
• Direct On Line (DOL) starter 1.00 Bh 520,500.00
• Pilot light 220 VAC c/w neon bulb & fuse 3.00 Bh 35,000.00
• Bare copper, 100A 1.00 set 550,000.00
• Instalasi 1.00 Ls 800,000.00
• Peralatan dan material bantu 1.00 Ls 800,000.00
Sub Jumlah
JUMLAH - II
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5
III. KABEL DAYA UTAMA
Pengadaan dan pemasangan Kabel daya listrik, galian, pelindung sesuai gambar, urugan kembali.
beserta terminasi dan kelengkapan lainnya.
Dari kWh meter PLN ke MDP
- NYY 4 x 50 mm² 21.00 M¹ 160,000.00
Dari MDP ke :
- LP-OL, NYY 4 x 4 mm² 17.00 M¹ 14,800.00
- LP-A, NYY 4 x 6 mm² + NYA 6 mm2 4.00 M¹ 26,900.00
- LP-B, NYY 4 x 6 mm² + NYA 6 mm2 8.00 M¹ 26,900.00
- PP-AB, NYY 4 x 4 mm² 28.00 M¹ 14,800.00
- PP-AC1, NYY 4 x 10 mm² + NYA 6 mm2 14.00 M¹ 37,500.00
- PP-AC2, NYY 4 x 10 mm² + NYA 6 mm2 21.00 M¹ 37,500.00
JUMLAH - III
IV. PENERANGAN LUAR DAN GARDU
Lampu Jalan HPIT 125W, tiang 9 meter, lengan 3 mtere, pondasi 4.00 bh 2,250,000.00
terminal box.
Lampu Sorot HPI-T 125 W, dan dudukan 1.00 bh 750,000.00
Lampu Taman HPLN 80W, tiang GIP, pondasi 13.00 bh 340,000.00
terminal box.
Instalasi peneragan luar, NYFGbY 3x4mm2, dalam pipa 18.00 bh 360,000.00
PVC Hi 20mm2, ditaman di tanah, dan kelengkapannya
galian tanah dan urugan kembali
Fitting E27, Lampu PL 14 W 4.00 bh 31,600.00
Instalasi lampu, NYY 3x2,5mm2, dalam pipa konduit 4.00 bh 180,000.00
PVC Hi 20mm2, inbow dos, dan kelengkapannya
Saklar ganda 2.00 bh 24,100.00
Outlet daya dinding dng instalasi NYM 3x2,5mm2 4.00 bh 210,000.00
dalam pipa conduit PVC Hi. dia.20mm
JUMLAH - IV
V. SISTEM TELEPON
Pengadaan dan pemasangan sistim telepon lengkap PABX, outlet
telepon, Hand set, sistim instalasi dan kelengkapan lainnya.
1 Peralatan Utama
a. PABX Kapasitas 30 extention, 6 incoming, 1.00 unit 50,000,000.00
power supply dan batery back-up
c. Main Distribution Frame, 40 pair in, 40 pair out. 1.00 unit 565,000.00
d. Sambungan line incoming TELKOM 4.00 line 750,000.00
Sub Jumlah
2 Kabel dari MDF / PABX ke Terminal Box
Pengadaan dan pemasangan kabel telepon tanah, termasuk peralatan bantu,
kabel ties, pelindung kabel, penggalian jalur kabel, bobokan tembok dan perapihan kembali.
a TBT-A, Kabel Telepon Indoor, 20 pair, 0,6mm 4.00 m 72,500.00
b TBT-B, Kabel Telepon Indoor, 20 pair, 0,6mm 12.00 m 72,500.00
Sub Jumlah
3 Instalasi telepon Lantai Satu
a. Terminal box TBT-A, Kapasitas 20 pair. 1.00 unit 350,000.00
b. Outlet telepon dinding, dan instalasi dari TBT-A ke 13.00 ttk 150,000.00
outlet dinding, dng kabel telepon indoor,
RVV 2 x 0,6mm, dalam pipa PVC Hi. 20mm.
Sub Jumlah
4 Instalasi telepon Lantai Atas
a. Terminal box TBT-B, Kapasitas 20 pair. 1.00 unit 350,000.00
b. Outlet telepon dinding, dan instalasi dari TBT-B ke 12.00 ttk 150,000.00
outlet dinding, dng kabel telepon indoor,
RVV 2 x 0,6mm, dalam pipa PVC Hi. 20mm.
Sub Jumlah
JUMLAH - V
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5
VI. INSTALASI JARINGAN DATA KOMPUTER
1 HUB 16 Kanal 1.00 bh 2,750,000.00
2 HUB 24 Kanal 1.00 bh 4,100,000.00
3 Kabel data UTP Cat. 5 dalam pipa PVC HI. Dia. 20mm 19.00 ttk 150,000.00
4 Outlet Data Komputer, dinding dng inbow dos, 19.00 bh 95,000.00
meja dengan outbow dos.
5 Kabel STP dari HUB ke Server, dlm pipa PVC 32.00 m 165,000.00
JUMLAH - VII
VII. SISTEM TATA SUARA
1 Mixer Pre Amplfier 4 input 1.00 bh 3,250,000.00
2 Power Amplifier 60 Watt RMS 1.00 bh 4,500,000.00
3 Dynamic Microphone dng desk stand 1.00 bh 275,000.00
4 Hand Microphone 1.00 bh 175,000.00
5 Speaker kolom 10 Watt 6.00 bh 950,000.00
6 Instalasi Speaker dng kabel NYMHY 2x2,5mm2 dlm 6.00 ttk 150,000.00
pipa konduit PVC 20mm
7 Conference system untuk ruang rapat 1.00 set 10,000,000.00
kap. 10 delegates, perkabelan dan power supllay
JUMLAH -VIII
SUB TOTAL - ELEKTRIKAL NON STANDARD
F. PEK. MEKANIKAL NON STANDARD
I. TANGKI AIR DAN PEMIPAAN AIR BERSIH
1 Tangki air fiber bulat, kapasitas 1 m3, lengkap dengan 2.00 unit 1,500,000.00
dudukan penyangga di atas plat dak.
2 Pemipaan tangki air, header, gate valve, foating valve
dan drain beserta kelengkapannya sesuai gambar
• Gate valve ø 25 mm 2.00 Bh 100,000.00
• Gate valve ø 32 mm 2.00 Bh 150,000.00
• Gate valve ø 40 mm 4.00 Bh 200,000.00
• Gate valve ø 50 mm 2.00 Bh 250,000.00
• Header GIP ø 75 mm 1.00 Bh 600,000.00
• Floating Valve ø 40 mm 2.00 Bh 450,000.00
3 Pemipaan air bersih utama
Pengadaan dan pemasangan pipa distribusi air bersih, GIP Medium A,
Pipa dicat warna biru.Lengkap dengan fitting dan asesories yang diperlukan
Pipa utama dari Tangki atas sampai toilet
• GIP ø 40 mm dari meter air PDAM ke reservoir 42.00 m 168,600.00
• GIP ø 32 mm dari reservoir ke roof tank 22.00 m 111,500.00
• GIP ø 25 mm dari roof tank ke toilet 32.00 m 97,800.00
JUMLAH - I
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5
II. RESERVOIR, SEPTIC TANK, RESAPAN DAN PEMIPAAN KE DRAINASE
• Septic tank kapasitas 5 m3 2.00 unit 6,071,900.00
• Bak Kontrol, 0.6mx0,6m, sesuai gambar 2.00 unit 450,000.00
• PVC AW ø 75 mm 112.00 m 30,900.00
• PVC AW ø 100 mm 122.00 m 51,900.00
JUMLAH - II
III. PENGKONDISIAN UDARA (AC)
Pemipaan refrigerant dari indoor ke outdoor
Pipa Liquid dan Gas, ukuran sesuai rekomendasi pabrik, pipa tembaga kualitas tinggi, Type L atau jenis oxidized
phosphorous seamless copper pipe, merk Crane Enfiled atau setara. Lengkap dng aseories yang diperlukan, sesuai
spesifikasi teknis. isolasi pipa refrigerant bagian gas (gas side) dengan thermaflex, bagian liquid tidak diisolasi.
1 Indoor unit Lt. 2 ke Outdoor unit masing-masing 140.00 m 53,000.00
2 Indoor unit Lt. 1 ke Outdoor unit masing-masing 180.00 m 53,000.00
Pemipaan pengembunan (drain) indoor
Pipa PVC AW, lengkap penggantung sesuai spesifikasi teknis, U-trap, sambungan solvent cemnet, konektor, slope 1%
Isolasi pipa pengembunan (termasuk pipa dalam dinding), dengan flexible closed cell elastomeric insulation
merk Amstrong (armaflex) atau setara.
Ukuran pipa minimal dia. 20 mm, atau sesuai rekomendasi pabrik.
3 Pipa PVC AW ø 20 mm, dng isolasi 176.00 m 8,400.00
4 Pipa PVC AW ø 25 mm, dng isolasi 32.00 m 9,900.00
JUMLAH - III
SUB TOTAL - MEKANIKAL NON STANDARD
TOTAL JUMLAH NON STANDARD
IV. PEKERJAAN BANGUNAN PENDUKUNG
A. PEK. PEMBUATAN POS JAGA (3 Unit) 3.00
I. PEKERJAAN GALIAN
1 Pek. Pasang Papan Bouwplang 48.00 m1 56,969.42
2 Galian tanah pondasi batu kali 15.36 m3 43,600.00
3 Urugan pasir urug t=10 cm 1.92 m3 570,900.00
SUB JUMLAH
II. PEKERJAAN PONDASI & BETON 8.00
1 Pekerjaan aanstamping batu kosong 2.88 m3 195,400.00
2 Pek. Pondasi Batu kali camp. 1Pc : 4Psr 8.10 m3 440,200.00
3 Urugan tanah ex galian pondasi 2.46 m3 8,000.00
4 Beton Sloof 15/20 0.72 m3 3,346,900.00
5 Beton Kolom 15/15 38.40 m1 458,305.78
6 Beton Balok Dak 15/20 24.00 m1 609,315.70
SUB JUMLAH
III. PEKERJAAN DINDING & PLESTERAN
1 Pasangan dinding bata 1 : 5 51.84 m2 65,400.00
2 Pekerjaan plester dan acian dinding 1 : 5 103.68 m2 22,600.00
3 Pekerjaan dinding keramik 20/25 h= 1,5m 7.05 m2 119,600.00
4 Pekerjaan plester dan acian ban 1 : 2 19.40 m1 32,500.00
SUB JUMLAH
IV. PEKERJAAN KUSEN PINTU.JENDELA & ASESORIES
1 Pasang Pintu Type-P1 3.00 Unit 2,504,000.00
2 Jendela Type - J1 6.00 Unit 1,500,000.00
SUB JUMLAH
V. PEKERJAAN ATAP & PLAFOND
1 Pek. Kuda-kuda rangka baja ringan 36.75 m2 250,000.00
2 Pek. Penutup Atap Matal 36.75 m2 129,396.00
3 Pek. Pasdang Nok Genteng Metal 18.00 m1 132,485.00
4 Lisplang Plat GRC Lbr.30cm tebat 12 mm 48.00 m1 80,000.00
5 Pek. Pasang Plafong Gypsum rangka Hollow 12.00 m2 250,000.00
6 Pek. Pasang Plafong GRC rangka Hollow 12.00 m2 245,000.00
7 Pek. Pasang List Plafong 96.00 m1 13,000.00
SUB JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5
VI. PEKERJAAN LANTAI , FINISHING & PENGECATAN
1 Urugan pasir bawah lantai t=10 cm 0.53 m3 570,900.00
2 Lantai kerja t = 5 cm 12.00 m2 1,009,452.88
3 Pekerjaan lantai keramik 30x30 16.00 m2 1,207,455.00
4 Pekerjaan Pengecatan Dinding 96.63 m2 19,232.30
5 Pekerjaan Pengecatan Plafond 24.00 m2 19,232.30
6 Lantai Rabat t = 5 cm 4.00 m3 1,009,452.88
7 Saluran Gravel U 20 cm 4.00 m1 160,500.00
SUB JUMLAH
VII. PEKERJAAN INSTALASI LISTRIK
1 Titik cahaya 3.00 titik 196,260.22
2 Titik stop kontak 1 fasa 3.00 titik 215,886.24
3 Stop Kontak 3.00 bh 24,100.00
4 Saklar Ganda 3.00 bh 24,100.00
5 Pasang Lampu SL 25 watt 3.00 bh 45,000.00
SUB JUMLAH
SUB TOTAL - A
B. PEK. PEMBANGUNAN MUSHOLA & KANTIN 78.25
I. PEKERJAAN GALIAN
1 Pek. Pasang Papan Bouwplang 27.00 m1 56,969.42
2 Galian tanah pondasi batu kali 32.88 m3 43,600.00
3 Urugan pasir urug t=10 cm 2.63 m3 570,900.00
SUB JUMLAH
II. PEKERJAAN PONDASI & BETON
1 Pekerjaan aanstamping batu kosong 5.26 m3 858,825.00
2 Pek. Pondasi Batu kali camp. 1Pc : 4Psr 11.84 m3 15,023,850.00
3 Urugan tanah ex galian pondasi 23.24 m3 20,910.00
4 Beton Sloof 15/20 1.32 m3 3,346,900.00
5 Beton Kolom 15/15 1.37 m3 6,164,000.00
6 Beton Balok Dak 15/20 1.60 m3 4,849,300.00
7 Beton Balok Dak 20/40 0.96 m3 6,386,000.00
7 Beton Plat Dak Atap t=10cm.Beton K-225 11.20 m3 4,639,200.00
SUB JUMLAH
III. PEKERJAAN DINDING & PLESTERAN
1 Pasangan dinding bata 1 : 4 129.96 m2 1,127,930.00
2 Pekerjaan plester dan acian dinding 1 : 4 259.92 m2 418,595.00
3 Pekerjaan dinding keramik 20/25 h= 1,5m 30.78 m2 1,051,500.00
4 Pekerjaan List Dinding Keramik 10x20 20.52 m1 25,000.00
SUB JUMLAH
IV. PEKERJAAN ATAP & PLAFOND
1 Pek. Rangka Atap Baja Ringan 64.00 m2 250,000.00
2 Pek. Pasang Penutup Atap genteng Metal 64.00 m2 129,396.00
3 Pek. Pasang Nok Bubung genteng Metal 45.60 m2 132,485.00
4 Pekerjaan Pasang papan Listplang 3/20,kayu kamper 12.80 m2 80,000.00
5 Pekerjaan Plafond Gypsum 9mm + rangka Hollow 40x40mm 28.80 m2 250,000.00
6 Pekerjaan Plafond GRC 5mm + rangka Hollow 40x40mm (Overstek atap) 22.40 m2 245,000.00
6 Pekerjaan Pasang List Plafond Gypsum 19.20 m2 13,000.00
7 Pekerjaan Pasang List Plafond Kayu (Overstek atap) 44.80 m2 13,500.00
SUB JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5
V. PEKERJAAN KUSEN PINTU.JENDELA & ASESORIES
1 Pasang Pintu Type-P1 1.00 Unit 3,467,800.00
2 Pasang Pintu Type-P2 2.00 Unit 3,944,900.00
3 Pasang Pintu Type-P3 2.00 Unit 7,041,900.00
4 Pasang Pintu Type-P4 5.00 Unit 2,417,900.00
5 Pasang Pintu Type-P5 (PVC) 5.00 Unit 463,200.00
6 Pasang Pintu Type-PJ1 4.00 Unit 7,004,900.00
7 Pasang Jendela Type - J1 4.00 Unit 4,373,600.00
8 Pasang Jendela Type - BV-1 1.00 Unit 1,287,900.00
9 Pasang Jendela Type - BV-2 2.00 Unit 2,093,100.00
SUB JUMLAH
VI. PEKERJAAN LANTAI , FINISHING & PENGECATAN
1 Urugan pasir bawah lantai t=10 cm 10.08 m3 570,900.00
2 Lantai kerja t = 5 cm 5.04 m3 1,009,452.88
3 Pekerjaan lantai keramik 40/40 91.20 m2 93,800.00
4 Pekerjaan lantai keramik KM 20/20 9.60 m2 88,800.00
5 Pekerjaan Finishing Dak Beton Expose 112.00 m2 32,500.00
6 Pekerjaan Pengecatan Dinding 259.92 m2 26,000.00
7 Pekerjaan Pengecatan Plafond Beton expose 112.00 m2 28,600.00
8 Waterproofing Dak ( Emulsion) 112.00 m2 29,400.00
9 Lantai Rabat t = 5 cm 2.00 m2 1,009,452.88
10 Saluran Gravel U 20 cm 40.00 m1 160,500.00
SUB JUMLAH
VII. PEKERJAAN INSTALASI LISTRIK
1 Titik cahaya 18.00 titik 185,000.00
2 Titik stop kontak 1 fasa 6.00 titik 210,000.00
3 Stop Kontak 6.00 bh 24,100.00
4 Saklar Tunggal 2.00 bh 18,100.00
5 Saklar Ganda 8.00 bh 24,100.00
6 Pasang Lampu DVD RMI 2x36watt 10.00 bh 422,600.00
7 Pasang Lampu Type BL 1x18watt 6.00 bh 365,000.00
8 Pasang Lampu SL 25 watt 2.00 bh 31,600.00
SUB JUMLAH
VIII. PEKERJAAN SANITARY & INSTALASI AIR
1 Floor drain 3.00 Unit 40,800.00
2 Kran air 1/2" 9.00 Unit 52,009.93
3 Closet Jongkok 2.00 Unit 1,010,400.00
4 Instalasi Pipa Air Bersih PVC dia 1/2" 15.00 m' 7,400.00
5 Instalasi Pipa Air Bersih PVC dia 3/4" 25.00 m' 8,400.00
6 Instalasi Pipa Air Kotor PVC dia 4" 8.00 m' 51,900.00
7 Instalasi Pipa Air Kotor PVC dia 3" 6.00 m' 30,900.00
8 Septiktank uk. Kecil berikur rembesan 1.00 Unit 3,803,300.00
SUB JUMLAH
SUB TOTAL - B
C. PEK. RUANG CETAK PLAT & R.PENJAGA KANTOR
I. PEKERJAAN GALIAN
1 Pek. Pasang Papan Bouwplang 60.00 m1 33,100.00
2 Galian tanah pondasi batu kali 68.00 m3 16,800.00
3 Urugan pasir urug t=10 cm 5.44 m3 113,400.00
SUB JUMLAH
II. PEKERJAAN PONDASI & BETON
1 Pekerjaan aanstamping batu kosong 7.20 m3 195,400.00
2 Pek. Pondasi Batu kali camp. 1Pc : 4Psr 16.20 m3 440,200.00
3 Urugan tanah ex galian pondasi 39.16 m3 8,000.00
4 Beton Sloof 15/20 2.46 m3 3,346,900.00
5 Beton Kolom 15/15 1.58 m3 6,164,000.00
6 Beton Ring Balok 15/20 3.96 m3 4,849,300.00
SUB JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN
(RP.)
1 2 3 4 5
III. PEKERJAAN DINDING & PLESTERAN
1 Pasangan dinding bata 1 : 4 138.19 m2 63,200.00
2 Pekerjaan plester dan acian dinding 1 : 4 276.37 m2 23,400.00
3 Pekerjaan dinding keramik 20/25 h= 1,5m 13.80 m2 119,600.00
4 Pekerjaan List Dinding Keramik 10x20 9.20 m1 15,000.00
SUB JUMLAH
IV. PEKERJAAN ATAP & PLAFOND
1 Pek. Rangka Atap Baja Ringan 188.09 m2 250,000.00
2 Pek. Pasang Penutup Atap genteng Metal 188.09 m2 129,396.00
3 Pek. Pasang Nok Bubung genteng Metal 59.00 m2 132,485.00
4 Pekerjaan Pasang papan Listplang 3/20,kayu kamper 64.04 m2 80,000.00
5 Pekerjaan Plafond Gypsum 9mm + rangka Hollow 40x40mm 60.00 m2 250,000.00
6 Pekerjaan Plafond GRC 5mm + rangka Hollow 40x40mm (Overstek atap) 106.00 m2 245,000.00
6 Pekerjaan Pasang List Plafond Gypsum 62.00 m2 13,000.00
7 Pekerjaan Pasang List Plafond Kayu (Overstek atap) 180.00 m2 13,500.00
SUB JUMLAH
V. PEKERJAAN KUSEN PINTU.JENDELA & ASESORIES
1 Pasang Pintu Type-P1 1.00 Unit 2,504,000.00
2 Pasang Pintu Type-PJ1 3.00 Unit 3,925,900.00
3 Pasang Pintu Type-P2 (PVC) 1.00 Unit 463,200.00
4 Pasang Jendela Type - J1 7.00 Unit 3,585,700.00
5 Pasang Jendela Type - BV-1 1.00 Unit 1,393,200.00
SUB JUMLAH
VI. PEKERJAAN LANTAI , FINISHING & PENGECATAN
1 Urugan pasir bawah lantai t=10 cm 10.80 m3 113,400.00
2 Lantai kerja t = 5 cm 5.40 m3 521,500.00
3 Pekerjaan lantai keramik 30/30 96.00 m2 88,800.00
4 Pekerjaan lantai keramik KM 20/20 6.00 m2 88,800.00
5 Pekerjaan Pengecatan Dinding 262.57 m2 28,600.00
6 Pekerjaan Pengecatan Plafond 166.00 m2 27,200.00
7 Lantai Rabat t = 5 cm 2.60 m3 521,500.00
8 Saluran Gravel U 20 cm 56.00 m1 160,500.00
SUB JUMLAH
VII. PEKERJAAN INSTALASI LISTRIK
1 Titik cahaya 7.00 titik 185,000.00
2 Titik stop kontak 1 fasa 5.00 titik 210,000.00
3 Stop Kontak 5.00 bh 24,100.00
4 Saklar Tunggal 1.00 bh 18,100.00
5 Saklar Ganda 4.00 bh 24,100.00
6 Pasang Lampu DVD RMI 2x36watt 4.00 bh 422,600.00
7 Pasang Lampu Type BL 1x18watt 2.00 bh 365,000.00
8 Pasang Lampu SL 25 watt 1.00 bh 31,600.00
SUB JUMLAH
VIII. PEKERJAAN SANITARY & INSTALASI AIR
1 Floor drain 1.00 Unit 70,600.00
2 Kran air 1/2" 1.00 Unit 45,000.00
3 Bak mandi fibber (lengkap penguras) 1.00 Unit 426,400.00
4 Closet Duduk 1.00 Unit 2,024,300.00
5 Instalasi Pipa Air Bersih PVC dia 1/2" 8.00 m' 7,400.00
6 Instalasi Pipa Air Bersih PVC dia 3/4" 12.00 m' 8,400.00
7 Instalasi Pipa Air Kotor PVC dia 4" 8.00 m' 51,900.00
8 Instalasi Pipa Air Kotor PVC dia 3" 6.00 m' 30,900.00
9 Septiktank uk. Kecil berikur rembesan 1.00 Unit 3,803,300.00
SUB JUMLAH
SUB TOTAL - C
TOTAL JUMLAH PEK.BANGUNAN PENDUKUNG
TOTAL

(RP.)
#N/A

32,424,715,076.91

3,743,022,292.16

1,173,101,495.64
#N/A
#N/A
#N/A
#N/A

, 23 Desember 2009

an Perencana
ung Kencana
TUNG

TOTAL JUMLAH
HARGA
(RP.)
6=5X3

2,013,400.00
21,040,030.00
731,048,008.90
#N/A
2,500,000.00
1,000,000.00
39,000,000.00
#N/A

5,630,857.92
2,350,628.00
2,215,752.00
1,477,168.00
6,016,429.65
1,547,367.36
1,571,889.39
24,391,248.34
2,277,189.33
47,478,529.98

3,491,638.92
160,337,531.97
49,480,856.55
11,740,166.59
158,492,248.90
581,138,245.96
22,012,812.35
18,599,152.66
817,037,697.97
42,911,130.41
1,865,241,482.26

1,970,856,346.93
5,717,880.00
83,411,651.96
2,838,408,487.78
768,401,544.48
16,036,206.15
8,071,937,711.49
157,671,806.45
306,489,634.93
88,780,389.91
20,937,915.40
142,892,403.17
22,542,614.05
14,494,084,592.69
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

1,476,664,117.94
6,611,298.75
144,221,954.38
577,303,421.24
105,482,600.42
64,144,824.58
1,010,558,434.62
133,635,051.21
133,635,051.21
42,763,216.39
590,132,386.16
265,131,941.61
3,533,922,294.55
6,289,668.00
175,596,457.29
76,448,865.03
12,741,477.51
8,355,283,060.90
24,762,087,665.84

170,782,425.00
17,078,242.50
81,627,167.85
88,394,250.66
11,051,315.77
8,980,896.00
377,914,297.78

515,570,734.00
417,148,227.23
189,904,385.62
140,953,829.23
324,415.00
4,452,000.00
4,953,900.00
104,960,730.00
1,247,750.00
15,159,075.75
30,108,750.00
1,424,783,796.83

111,600,930.00
90,296,300.85
634,542,399.93
470,980,071.28
241,741.50
1,890,000.00
1,568,000.00
78,212,673.00
929,775.00
1,390,261,891.55
2,815,045,688.38
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

78,595,000.00
11,531,100.00
59,125,500.00
25,517,100.00
20,885,600.00
72,360,000.00
7,236,000.00
28,944,000.00
10,555,500.00
7,236,000.00
321,985,800.00

11,531,100.00
51,242,100.00
29,162,400.00
20,885,600.00
72,360,000.00
28,944,000.00
1,077,000.00
215,202,200.00
537,188,000.00

143,250,000.00
10,528,875.00
3,919,500.00
963,900.00
157,698,375.00

147,375,000.00
7,717,500.00
7,717,500.00
5,070,000.00
526,500.00
168,406,500.00
326,104,875.00
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

66,884,949.14
3,571,570.47
223,086,773.25
11,357,144.82
13,131,698.70
725,032,013.06
142,968,200.73
128,378,539.07
73,591,634.70
6,831,578.25
936,661.86
1,395,770,764.05

40,398,311.25
234,241,111.91
13,131,698.70
725,032,013.06
120,906,949.80
61,326,362.25
1,195,036,446.97
2,590,807,211.02

4,989,075.00
5,186,807.07
16,794,121.32
11,056,841.59
1,185,820.10
39,212,665.09

5,514,075.00
4,833,581.84
23,872,573.18
11,712,470.70
1,185,820.10
1,252,977.38
48,371,498.21
126,796,828.38
6,395,942,602.78

92,315,592.00
48,081,037.50
19,232,415.00

100,000.00
320,000.00
160,049,044.50

43,272,933.75
19,232,415.00
4,808,103.75

100,000.00
320,000.00
67,733,452.50
227,782,497.00
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

9,631,248.00
8,113,878.00
72,808,252.37
16,315,574.76
106,868,953.13

8,668,123.20
2,704,626.00
27,736,477.09
39,109,226.29
145,978,179.42

367,200.00
520,099.25
15,748,374.00
2,477,250.00
1,050,000.00
6,589,000.00
26,751,923.25

652,800.00
520,099.25
23,622,561.00
4,954,500.00
2,100,000.00
11,530,750.00
3,500,000.00
46,880,710.25
73,632,633.50
447,393,309.92

2,750,000.00
1,950,000.00

325,000.00
241,500.00

840,000.00
420,000.00
285,000.00

2,750,000.00
1,950,000.00

825,000.00
241,500.00

1,300,000.00
13,878,000.00

8,436,000.00
1,090,000.00
9,526,000.00

2,950,000.00
2,950,000.00
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

8,046,669.02
4,513,985.06
6,869,107.70
1,766,341.98
5,642,481.33

17,326,600.00
8,050,000.00
11,025,000.00
3,375,000.00
602,500.00
457,900.00
380,100.00
68,055,685.09
94,409,685.09

2,750,000.00
1,950,000.00

325,000.00
241,500.00

770,000.00
420,000.00
285,000.00
252,688,555.26

8,436,000.00
1,090,000.00
9,526,000.00

8,046,669.02
2,943,903.30
4,121,464.62
1,766,341.98
5,642,481.33

17,326,600.00
5,250,000.00
6,615,000.00
3,375,000.00
602,500.00
457,900.00
380,100.00
56,527,960.25
318,742,515.50

14,625,000.00
800,000.00
1,000,000.00
11,800,000.00
28,225,000.00
441,377,200.59
32,424,715,076.91
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

1,521,083.63
1,521,083.63

155,216.00
384,453.30
30,172.78
569,842.08

1,956,746.88
77,018,264.64
1,174,380.81
962,000.29
957,985.77
5,813,946.72
7,483,888.96
2,202,536.49
1,427,950.18
1,865,171.93
1,386,325.94
589,081.03
6,576,833.98
978,560.07
726,869.68
336,032.49
2,194,020.26
113,650,596.11

591,872.25
454,647.60
20,000.00
1,066,519.85

1,331,528.51
390,000.00
224,250.00
75,000.00
80,000.00
20,000.00
250,000.00
700,000.00
75,000.00
15,000.00
14,304.00
100,000.00
3,275,082.51
120,083,124.19

5,695,347.31
8,717,558.40
11,414,802.96
2,434,740.00
28,262,448.67

25,757,535.87
1,248,507,851.14
253,241,530.66
96,599,400.78
152,286,272.90
1,776,392,591.35

563,807,089.80
209,238,896.70
10,746,990.00
TOTAL JUMLAH
HARGA
(RP.)
6=5X3
11,456,690.66
8,776,460.00
16,467,464.55
779,060.79
821,272,652.50
2,625,927,692.52

979,874.10
1,499,840.00
1,963,896.00
160,756.08
2,126,863.20
6,731,229.38

4,431,537.00
214,803,495.38
43,569,742.80
17,568,388.23
26,200,575.10
306,573,738.51

5,034,512.00
3,552,927.04
842,400.00
4,113,915.52
1,250,025.00
10,000,000.00
24,793,779.56
338,098,747.45

44,298,000.00
21,667,500.00
10,918,800.00
33,180,000.00
110,064,300.00
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

21,790,503.00
50,740,742.70
22,724,381.70
28,327,653.90
105,632,057.40
6,010,452.00
23,472,372.00
258,698,162.70

2,500,000.00

3,498,750.00
5,831,250.00
125,000.00
390,000.00
735,000.00
1,000,000.00
4,500,000.00
18,580,000.00
387,342,462.70

65,430,465.30

65,430,465.30

550,000.00
649,500.00
2,700,000.00
105,000.00
550,000.00
800,000.00
800,000.00
6,154,500.00

550,000.00
649,500.00
2,700,000.00
105,000.00
550,000.00
800,000.00
800,000.00
6,154,500.00

550,000.00
622,000.00
300,000.00
222,000.00
520,500.00
105,000.00
550,000.00
800,000.00
800,000.00
4,469,500.00
16,778,500.00
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

3,360,000.00

251,600.00
107,600.00
215,200.00
414,400.00
525,000.00
787,500.00
5,661,300.00

9,000,000.00

750,000.00
4,420,000.00

6,480,000.00

126,400.00
720,000.00

48,200.00
840,000.00

22,384,600.00

50,000,000.00

565,000.00
3,000,000.00
53,565,000.00

290,000.00
870,000.00
1,160,000.00

350,000.00
1,950,000.00

2,300,000.00

350,000.00
1,800,000.00

2,150,000.00
59,175,000.00
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

2,750,000.00
4,100,000.00
2,850,000.00
1,805,000.00

5,280,000.00
16,785,000.00

3,250,000.00
4,500,000.00
275,000.00
175,000.00
5,700,000.00
900,000.00

10,000,000.00

24,800,000.00
211,014,865.30

3,000,000.00

200,000.00
300,000.00
800,000.00
500,000.00
600,000.00
900,000.00

7,081,200.00
2,453,000.00
3,129,600.00
18,963,800.00
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

12,143,800.00
900,000.00
3,460,800.00
6,331,800.00
22,836,400.00

7,420,000.00
9,540,000.00

1,478,400.00
316,800.00
18,755,200.00
60,555,400.00
3,743,022,292.16

2,734,532.38
669,696.00
1,096,128.00
4,500,356.38

562,752.00
3,565,620.00
19,680.00
2,409,768.00
17,598,941.95
14,623,576.80
38,780,338.75

3,390,336.00
2,343,168.00
843,180.00
630,500.00
7,207,184.00

7,512,000.00
9,000,000.00
16,512,000.00

9,187,500.00
4,755,303.00
2,384,730.00
3,840,000.00
3,000,000.00
2,940,000.00
1,248,000.00
27,355,533.00
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

299,722.50
12,113,434.56
19,319,280.00
1,858,417.15
461,575.20
4,037,811.52
642,000.00
38,732,240.93

588,780.66
647,658.73
72,300.00
72,300.00
135,000.00
1,516,039.39
134,603,692.44

1,538,174.46
1,433,568.00
1,501,695.36
4,473,437.82

4,518,106.56
177,834,307.68
485,848.03
4,401,842.88
8,460,090.00
7,774,397.76
6,130,560.00
51,959,040.00
261,564,192.91

146,588,038.66
108,802,886.78
32,365,170.00
513,000.00
288,269,095.44

16,000,000.00
8,281,344.00
6,041,316.00
1,024,000.00
7,200,000.00
5,488,000.00
249,600.00
604,800.00
44,889,060.00
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

3,467,800.00
7,889,800.00
14,083,800.00
12,089,500.00
2,316,000.00
28,019,600.00
17,494,400.00
1,287,900.00
4,186,200.00
90,835,000.00

5,754,672.00
5,087,642.52
8,554,560.00
852,480.00
3,640,000.00
6,758,024.00
3,203,200.00
3,292,800.00
2,018,905.76
6,420,000.00
45,582,284.28

3,330,000.00
1,260,000.00
144,600.00
36,200.00
192,800.00
4,226,000.00
2,190,000.00
63,200.00
11,442,800.00

122,400.00
468,089.33
2,020,800.00
111,000.00
210,000.00
415,200.00
185,400.00
3,803,300.00
7,336,189.33
754,392,059.77

1,986,000.00
1,142,400.00
616,896.00
3,745,296.00

1,406,880.00
7,131,240.00
313,280.00
8,233,374.00
9,708,300.00
19,203,228.00
45,996,302.00
TOTAL JUMLAH
HARGA
(RP.)
6=5X3

8,733,355.20
6,467,104.80
1,650,480.00
138,000.00
16,988,940.00

47,023,500.00
24,338,611.22
7,816,615.00
5,123,200.00
15,000,000.00
25,970,000.00
806,000.00
2,430,000.00
128,507,926.22

2,504,000.00
11,777,700.00
463,200.00
25,099,900.00
1,393,200.00
41,238,000.00

1,224,720.00
2,816,100.00
8,524,800.00
532,800.00
7,509,559.20
4,515,200.00
1,355,900.00
8,988,000.00
35,467,079.20

1,295,000.00
1,050,000.00
120,500.00
18,100.00
96,400.00
1,690,400.00
730,000.00
31,600.00
5,032,000.00

70,600.00
45,000.00
426,400.00
2,024,300.00
59,200.00
100,800.00
415,200.00
185,400.00
3,803,300.00
7,130,200.00
284,105,743.42
1,173,101,495.64
BACK UP DATA
PERHITUNGAN VOLUME
PEMBANGUNAN
KANTOR BERSAMA SAMSAT
KOTA PANGKALPINANG
DATA PERHITUNGAN VOLUME+A251
I. PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi Site
PANJANG X LEBAR
109 45 4905
4905 M2
2 Pek. Pasang Bouwplank
PANJANG X UNIT
97.2 2 194.4
41 2 82
276.4 M'
3 Luas Bangunan (IMB)
PANJANG X LEBAR X UNIT
Lt. 1 95.2 41 1 = 3903.20
Lt. 2 43 5 4 = 860.00
12 5 4 = 240.00
5003.20 M2
II. PEKERJAAN STRUKTUR
A. PEKERJAAN GALIAN TANAH & URUGAN PASIR
1 Pek. Galian Tanah
PANJANG X LEBAR X UNIT X DALAM =
PLAT SETEMPAT 1.25 1.25 144 2 450.00
POER 1.25 1.25 24 0.5 18.75
Pondasi Tangga 0.7 0.6 72 2 60.48
SLOOF 95.2 0.4 10 0.5 190.40
41 0.4 20 0.5 164.00
883.63 M3
2 Pek. Galian Tanah Pondasi batu belah
PANJANG X LEBAR X DALAM =
224.7 1 1 224.7 M3

3 Pek. Urugan Pasir Bawah Poer ,Pond.Tangga & Sloof S1 t=10cm


PANJANG X LEBAR X TEBAL X UNIT =
PLAT SETEMPAT 1 1 0.1 144 14.40
POER 1 1 0.1 24 2.40
Pondasi Tangga 0.7 0.6 0.1 72 3.02
SLOOF 95.2 0.2 0.1 10 19.04
41 0.2 0.1 20 16.40
55.26 M3
4 Pek. Urugan Pasir Bawah Pondasi batu kali t=10cm
PANJANG X LEBAR X TEBAL =
224.7 0.8 0.1 17.976 M3

B. PEKERJAAN PONDASI & STRUKTUR DASAR


1 Pek. Aanstamping Batukali
PANJANG X LEBAR X TEBAL =
224.7 0.8 0.15 26.964 M3
2 Pek. Pondasi Batu kali camp. 1Pc:4Psr
PANJANG X PENAMPANG PONDASI X TINGGI =
224.7 0.3 + 0.6 0.7 70.7805 M3
2
3 Pek. Lantai Kerja dibawah Pond.plat, Pond. Tangga & Sloof t=5 cm
PANJANG X LEBAR X TEBAL X UNIT =
PLAT SETEMPAT 1 1 0.05 144 7.20
POER 1 1 0.05 24 1.20
Pondasi Tangga 0.7 0.6 0.05 72 1.51
SLOOF 95.2 0.2 0.05 10 9.52
41 0.2 0.05 20 8.20
27.63 M3
4 Pek. Pondasi plat setempat
PANJANG X LEBAR X TEBAL X UNIT =
PLAT SETEMPAT 1 1 0.25 144 36.00 M3
36.00 M3
1 POER
PANJANG X LEBAR X TEBAL X UNIT =
POER 1 1 0.25 24 6.00 M3
6.00 M3
1 Pondasi Tangga
PANJANG X LEBAR X TEBAL X UNIT =
Pondasi Tangga 0.7 0.6 0.25 72 7.56 M3
7.56 M3
5 Sloof
PANJANG X UNIT = PANJANG X LEBAR X TINGGI = VOLUME
SL 1 95.2 10 952 0.2 0.4 76.16
SL 2 41 20 820 0.2 0.4 65.6
1772 M' 141.76 M3

6 Sloof 15/20
PANJANG X UNIT = PANJANG X LEBAR X TINGGI = VOLUME
1 1 224.7 0.15 0.2 6.741
0
0
0
6.741 M3

2 Pek. Lantai Kerja t=5 cm,dibawah beton lantai wiremesh


PANJANG X LEBAR X UNIT = LUAS X TEBAL = JUMLAH
95.2 41 1 3903.2 0.05 195.16 M3
3,903.20 M2 195.16 M3
C. PEKERJAAN BETON
Lantai 1
1 Pekerjaan kolom Beton K1 (40/40)
TINGGI PANJANG X LEBAR X UNIT =
6.78 X 0.5 0.5 24.00 40.68 M3

2 Pekerjaan kolom Beton K2 (30/30)


TINGGI PANJANG X LEBAR X UNIT =
3.78 X 0.3 0.3 144.00 48.99 M3

3 Pek Kolom Praktis KP 15/15


PENAMPANG KOLOM X TINGGI X UNIT =
DINDING BATA 0.15 X 0.15 3.78 140 = 11.91 M3
0.15 X 0.15 1 432 = 9.72 M3
21.63 M3
4 Pek. Balok B1 30/60 cm
PENAMPANG BALOK X PANJANG X UNIT =
0.3 X 0.6 7 40 50.40 M3
0.3 X 0.6 6 56 60.48 M3
110.88 M3
5 Pek. Balok B2 20/40 cm
PENAMPANG BALOK X PANJANG X UNIT =
0.2 X 0.4 3 40 9.60 M3
0.2 X 0.4 3 18 4.32 M3
0.2 X 0.4 3 12 2.88 M3
16.80 M3
6 Pek. Plat Lantai
PANJANG X LEBAR X UNIT = LUAS X TEBAL = JUMLAH
39 7 4 1092 0.12 131.04 M3
4 5 4 80 0.12 9.60 M3
6 12 4 288 0.12 34.56 M3
1,460.00 M2 175.20 M3
7 Pek. Plat Talang Beton
PANJANG X LEBAR X UNIT = LUAS X TEBAL = JUMLAH
KANAN 88.2 2.75 2 485.1 0.1 48.51 M3
485.10 M2 48.51 M3

Lantai 2
1 Pekerjaan kolom Beton K2 (30/30)
TINGGI PANJANG X LEBAR X UNIT =
3 X 0.3 0.3 44.00 11.88 M3

2 Pek Kolom Praktis KP 15/15


PENAMPANG KOLOM X TINGGI X UNIT =
DINDING BATA 0.15 X 0.15 3 260 = 17.55 M3
17.55 M3
3 Pek. Balok B2 20/40 cm
PENAMPANG BALOK X PANJANG X UNIT =
0.2 X 0.4 26 4 8.32 M3
0.2 X 0.4 28.4 2 4.54 M3
12.86 M3
4 Pek. Balok RB 15/20 cm
PENAMPANG BALOK X PANJANG X UNIT =
0.15 X 0.2 7 60 12.60 M3
0.15 X 0.2 6 56 10.08 M3
0.15 X 0.2 5 16 2.40 M3
0.15 X 0.2 3 8 0.72 M3
25.80 M3
Lantai 3
1 Pek Kolom Praktis KP 15/15
PENAMPANG KOLOM X TINGGI X UNIT =
DINDING BATA 0.15 X 0.15 3 44 = 2.97 M3
2.97 M3
2 Pek. Balok RB 15/20 cm
PENAMPANG BALOK X PANJANG X UNIT =
0.15 X 0.2 7 12 2.52 M3
0.15 X 0.2 7.2 4 0.86 M3
0.15 X 0.2 5 8 1.20 M3
4.58 M3

E. PEKERJAAN ATAP
1 Pekerjaan Luas rangka atap
PANJANG LEBAR JUMLAH UNIT

1 Bubung atap Metal


PANJANG X UNIT =
NOK UTAMA 53.25 1 53.25
53.25 M'
2 Lisplang
PANJANG X UNIT =
53.25 2 106.50
- 4 -
106.50 M'
1 Pekerjaan Pasang Angkur baut Ø 16 mm, Pjg 25 cm
JUMLAH UNIT UNIT
8 X 1 X 144 1152 Bh

1 Pekerjaan Base Plat t=12mm


LUAS PLAT UNIT Berat
0.3 0.3 X 144 97.22222 1,260.00 Kg
1,260.00 Kg
1 Pekerjaan Kuda-kuda baja IWF
PANJANG JUMLAH UNIT Berat
KUDA-A 12.6 X 2 X 11 #REF! #REF! Kg
#REF! Kg
1 Pekerjaan Plat Simpul
LUAS PLAT UNIT Berat
PINGGIR 0.3 0.3 X 22 #REF! #REF! Kg
ATAS 0.2 0.3 X 11 #REF! #REF! Kg
PADA IWF 0.07 0.3 X 132 #REF! #REF! Kg
#REF! Kg
1 Pekerjaan Siku dudukan Gordeng
PANJANG JUMLAH UNIT Berat
KUDA-A 0.6 X 16 X 11 - - Kg
- Kg
1 Pekerjaan Gordeng C
PANJANG JUMLAH UNIT Berat
52.5 X 8 X 2 7.516667 6,314.00 Kg
6,314.00 Kg
1 Pekerjaan Trekstang Gordeng
PANJANG JUMLAH UNIT Berat
8 X 2 X 20 1.583333 506.67 Kg
506.67 Kg
II. PEKERJAAN ARSITEKTUR

B. PEKERJAAN KUSEN
1 Pek. Kusen Pintu/jendela lengkap accessories
UNIT
Kusen Type RD 72
Kusen Type PH 4
Kusen Type P1 4
Kusen Type PVC 14
Kusen Type J1 80
Kusen Type J2 4
Kusen Type J3 30

2 Pek. Kusen Aluminium


UNIT PANJANG JUMLAH
Kusen Type RD 72 0 M'
Kusen Type PH 4 0 M'
Kusen Type P1 4 0 M'
Kusen Type PVC 14 0 M'
Kusen Type J1 80 7.5 600 M' 1.35 2.4 259.20
Kusen Type J2 4 24.9 99.6 M' 6.5 1.7 44.20
Kusen Type J3 30 5.2 156 M' 0.6 2 36.00
855.6 M' 339.40
3 Pek. Daun Jendela Aluminium (tanpa kaca)
UNIT PANJANG LEBAR JUMLAH JUMLAH
Kusen Type J1 80 0.48 1.38 2 105.984 M2
105.984 M2
4 Pek. Pasang Kaca Polos 5 mm
UNIT PANJANG LEBAR JUMLAH LUAS
Kusen Type J1 80 0.48 1.38 2 105.984 M2
Kusen Type J2 4 1.02 1.7 1 6.936 M2
Kusen Type J3 30 0.5 1.9 1 28.5 M2
141.42 M2
B. PEKERJAAN PENGGANTUNG & PENGUNCI
1 Pek. Kunci Pintu tanam aluminium
BH
Kusen Type P1 4
Kusen Type P2 2
6
2 Pek. Kunci Pintu Bulat(KM/WC)
BH
Kusen Type P3 4
3 Pek. Engsel Pintu
BH
Kusen Type P1 24
Kusen Type P2 6
Kusen Type P3 12
42
4 Pek. Slot Pintu tanam
BH
Kusen Type P1 4
5 Pek. Slot Putar Jendela
BH
Kusen Type J1 20
Kusen Type J2 4
24
6 Pek. Engsel Jendela
BH
Kusen Type J1 40
Kusen Type J2 8
48

C. PEKERJAAN PLAFOND
1 Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40
PANJANG X LEBAR X UNIT = LUAS
17.50 7.50 2 262.50
9.95 5.00 1 49.75
8.00 5.00 1 40.00
352.25 M2
2 Pek. Plafond calsiboard+ Rangka Hollow 40x40 (KM/WC)
PANJANG X LEBAR X UNIT = LUAS
3.00 1.50 2 9.00
3.00 1.50 2 9.00
18.00 M2
3 Pekerjaan profil gipsum
PANJANG x JMLH
25.00 2 = 50 m'
14.95 2 = 29.9 m'
13.00 2 = 26 m'
4.50 2 = 9 m'
4.50 1 = 4.5 m'
119.40 M'
C. PEKERJAAN LANTAI
1 Urugan pasir bawah lantai t=10 cm
PANJANG X LEBAR X UNIT X TEBAL = LUAS
FLOOR HARDENER 47.85 20.00 1 0.1 95.70
4.50 1.00 4 0.1 1.80
1.50 1.50 4 0.1 0.90
KERAMIK RABAT 54.15 1.58 1 0.1 8.56
4.50 1.58 4 0.1 2.84
1.50 1.95 4 0.1 1.17
8.00 1.00 1 0.1 0.80

111.77 M3
2 Lantai kerja t = 5 cm
PANJANG X LEBAR X UNIT X TEBAL = LUAS
FLOOR HARDENER 47.85 20.00 1 0.05 47.85
4.50 1.00 4 0.05 0.90
1.50 1.50 4 0.05 0.45
KERAMIK RABAT 54.15 1.58 2 0.05 8.56
4.50 1.58 4 0.05 1.42
1.50 1.95 4 0.05 0.59
8.00 1.00 2 0.05 0.80
60.56 M3

1 Pekerjaan lantai Beton t=10cm + Wiremesh M8


PANJANG X LEBAR X UNIT X TEBAL = LUAS
47.85 20.00 1 0.1 95.70
4.50 1.00 4 0.1 1.80
1.50 1.50 4 0.1 0.90
98.40 M3
1 Pekerjaan lantai keramik Rabat 40X40
PANJANG X LEBAR X UNIT =
54.15 1.58 2 171.11
4.50 1.58 4 28.44
1.50 1.95 4 11.70
8.00 1.00 2 16.00
227.25 M2

10 Pekerjaan Plin lantai keramik 10X40


PANJANG x JMLH
51.15 2 = 102.3 m'
20.00 2 = 40 m'
1.50 4 = 6 m'
148.30 M'
11 Pekerjaan lantai keramik KM 20X20
PANJANG X LEBAR X JUMLAH = LUAS
1.50 3.00 4 18.00
18.00 M2
1 Pekerjaan lantai Floorhardener
PANJANG X LEBAR X UNIT = LUAS
47.85 20.00 1 957.00
4.50 1.00 20 90.00
1.50 1.50 1.5 3.38
1,050.38 M2
Tiang 30x30x100

Vol/ 0.090000 0.000471 0.000723


Vol. /m³ 11.111111 0.005233 0.008038

jumlah vol. besi = 0.010257


sisa 1 m³ beton = 0.989743

spesi = 1 Pc : 2 Psr : 3 Agrt

1Pc = 0.164957 0.164957


2 Psr = 0.329914
3 Agrt = 0.494871
0.989743 semen

10mm X 12 M 7.4 Kg
12mm X 12 M 10.7 Kg

0.616666667
0.891666667

Besi ø10 3.70 kg 41.111111


Besi ø12 3.57 kg 39.62963
Besi Tambah 6.42 kg 6.420000
87.160741

Papan Cor 0.105 m³


0.000452
0.005024

0.548433 1Pc = 0.109971 0.109971 0.479100


3 Psr = 0.329914
5 Agrt = 0.549857
0.12342 0.989743

222.181575 kg 194.093340