RENCANA ANGGARAN BIAYA

PEKERJAAN : INTERIOR KANTOR DINAS PEKERJAAN UMUM BINA MARGA SULAWESI TENGGARA
LOKASI : KOTA KENDARI
TAHUN : 2019

HARGA JUMLAH
NO. URAIAN PEKERJAAN SPESIFIKASI BAHAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
I INTERIOR RUANG KADIS
1 Pek. Pemasangan Backdroob Multipleks Lapis HPL Multipleks 15 mm
Multipleks 8 mm
HPL Taco 78 M2 Rp 1,050,000.00 Rp 81,774,000.00
Lem Fox 168
Skrub
2 Pek. Pemasangan Wallpaper Wallpaper
74 M2 Rp 500,000.00 Rp 37,010,000.00
Lem Wallpaper
3 Pek. Pembuatan Partisi Dan Rak Dua Sisi Multipleks Lapis HPL Multipleks 15 mm
HPL Taco
18.75 M2 Rp 2,000,000.00 Rp 37,500,000.00
Lem Fox 168
Skrub
4 Pek. Pemasangan Kusen Dan Pintu Kaca Almunium Kaca 5mm
Open Back
Skrub
1 Unit Rp 3,000,000.00 Rp 3,000,000.00
Lem Silicon
Engsel kupu-kupu
Headle
5 Pek. Pemasangan Pintu Kamuflase Multipleks 8 mm
HPL Taco
2 Unit Rp 3,000,000.00 Rp 6,000,000.00
Engsel
Skrub
6 Pek. Pemasangan HPL Pada Meja Rapat HPL Taco
1 Ls Rp 10,000,000.00 Rp 10,000,000.00
Lem Fox 168
7 Pek. Pembuatan Kabinet Proyektor Multipleks 15 mm
HPL Taco
Lem Fox 168 2.44 M2 Rp 2,500,000.00 Rp 6,100,000.00
Engsel Sendok Hidrolik
Skrub
REAL COST Rp 181,384,000.00
PPN 10% Rp 18,138,400.00

JUMLAH Rp 199,522,400.00

DIBULAKAN Rp 199,500,000.00

Terbilang:
"Seratus Sembilan Puluh Sembilan Juta Lima Ratus Ribu Rupiah"
PEKERJAAN : PERENCANAAN REHABILITASI BERAT KANTOR
LOKASI : JL. BANDARA HALUOLEO KENDARI

HITUNGAN GAMBA

A PEKERJAAN PERSIAPAN
1 Galian Poer Plat A = V = PXLXT
P = 16
L = 1.4
T = 1.35
V = 30.24 M3

Jadi Jumlah Volume Galian Voer Plat Adalah 30.24 M3

2 Galian Tanah Pondasi garis = V = PXLXT A


A P = 60
L = 0.9
T = 0.62
V = 33.48 M3

Galian Tanah Pondasi Panggung = V = PXLXT


B P = 11
L = 0.45
T = 0.25
V = 1.24 M3
V = A+B
V = 33.48 M3

= 33.48 + 1.24 B
V = 34.72

Jadi Jumlah Volume Galian Pondasi Garis Adalah 34.72 M3


3 Urugan Kembali Alur Ponasi Per Plat
V = PXLXT - Poer Plat
P = 16
L = 1.4
T = 1.35
V = 30.24 M3
Volume Poer Plat
Volume a V = 0.21
135
Volume b V = 0.18
Volume c V = 0.09
Volume d V = 0.0525
Jumlah V = 0.53 X 16
V = 8.52
V = 30.24 - 8.52
V = 21.72 M3
Jadi Jumlah Volume Urugan Kembali Adalah 21.72 M3

4 Urugan Kembali Alur Pondasi P = 60.00


L = 0.44 M3
T = 0.52
V = 13.73 M3

Jadi Jumlah Volume Urugan Kembali Adalah 13.73 M3

5 Urugan Tanah Alas Lantai A P = 18.33


L = 11.8
T = 0.25
V = 54.07 M3
Urugan Tanah Alas Lantai B P = 3.8
L = 1.7
T = 0.25
V = 1.62 X 2
= 3.23 M3
Urugan Tanah Alas Lantai C P = 1.83
L = 1.33
T = 0.25
V = 0.61
Urugan Tanah Alas Lantai D P = 1.35
L = 1.48
T = 0.25
V = 0.50 M3

Urugan Tanah Alas Lantai E P = 2.35


L = 1.33
T = 0.25
V = 0.78 M3
=
Urugan Tanah Alas Lantai F P = 3.83
L = 1.48
T = 0.25
V = 1.42 M3

Urugan Tanah Alas Lantai G P = 1.85


L = 1.33
T = 0.25
V = 0.62 M3
Urugan Tanah Alas Lantai H P = 6
L = 2.5
T = 0.48
V = 7.20 M3

TOTAL JUMLAH V = 68.43 M3


Jadi Jumlah Volume Urugan Tanah Adalah 68.43 0
6 Urugan Pasir Alas Pondasi P = 60
L = 0.9
T = 0.1
V = 5.40 M3

Urugan Pasir Alas Ponasi Panggung

P = 11
L = 0.45
T = 0.1
V = 0.50
= 5.40 + 0.50
V = 5.90 M3

Jadi Jumlah Volume Adalah 5.90 M3

Err:509
7 A P = 18.33
L = 11.8
T = 0.1
V = 21.63 M3
B P = 3.8
L = 1.7
T = 0.1
V = 0.65 X 2
= 1.29 M3
C P = 1.83
L = 1.33
T = 0.1
V = 0.24

D P = 1.35
L = 1.48
T = 0.1
V = 0.20 M3

E P = 2.35
L = 1.33
T = 0.1
V = 0.31 M3
=
F P = 3.83
L = 1.48
T = 0.1
V = 0.57 M3

G P = 1.85
L = 1.33
T = 0.1
V = 0.25 M3
H P = 6
L = 2.5
T = 0.1
V = 1.50 M3

TOTAL JUMLAH V = 25.99 M3


Jadi Jumlah Volume dalah 25.99 M3
B PEKERJAAN PONDASI DAN BETON

1 Pas. Batu Kosong ( Poer Plat)

P = 16 -
L = 1.4
T = 0.15
V = 3.36 m3

Jadi Jumlah Volume Adalah = 3.36 m3

1 Pasangan Batu Kosong ( Garis)


P = 60 -
L = 0.9
T = 0.15
V = 8.10 m3
=

Jadi Jumlah Volume Adalah 8.10 m3


2 Pek. Pas Batu Gunung 1 : 5
A P = 60

L = 0.45
T = 0.7
V = 18.9 M3

Pondasi Panggung
B P = 11
L = 0.375
T = 0.48
V = 1.98
Tangga Panggung V = PXL/2
C P = 0.9
L = 11.1
V = 4.995
= 0
A+B+C V = 20.88 M3
JUMLAH V = 20.88 M3

Jadi Jumlah Volume Adalah 20.88 M3


3 Pek. Voort Plat = 16
A P = 1.2
L = 1.2
T = 0.15
V = 3.46 M3
B P = 16
L = 0.7
T = 0.15
V = 1.68
JUMLAH V = 5.14 M3

Jadi Jumlah Volume Adalah 5.14 M3


4 Err:509
P = 64 M1
L = 0.2
T = 0.35
V = 4.48 M3

Jadi Jumlah Volume Adalah 4.48 M3

5 Err:509
P = 12.28
M1

Jadi Jumlah Volume Adalah 12.28 M1

6 Err:509

P = 12.90
L = 0.20
T = 0.25
V = 0.65 M3

Jadi Jumlah Volume Adalah 0.65 M3


Err:509
P = 2.54 X 4
L = 0.40
T = 0.40
V = 0.41 X 4
= 1.63 M3

Jadi Jumlah Volume Adalah 1.63 M3

5 Err:509
Jumlah Titik = 16
P = 0.2
L = 0.35
T = 7.25
V = 8.12 M3

Jadi Jumlah Volume Adalah 8.12 M3

6 Err:509
P = 20.65 m1

Jadi Jumlah Volume Adalah 20.65 m1


7 Err:509
Jumlah Titik = 2
P = 0.2
L = 0.2
T = 4.7
V = 0.38 m3

Jadi Jumlah Volume Adalah 0.38 m3

8 Err:509
TERAS P = 2.75
L = 5.3
T = 0.12
V = 1.75 M3
JUMLAH V = 1.75 M3

Jadi Jumlah Volume Adalah 1.75 M3

9 Err:509

P = 59.45 M1
L = 0.15
T = 0.3
V = 2.67525

Jadi Jumlah Volume Adalah 2.68 M3


10 Err:509
P = 12.90
L = 0.15
T = 0.35
V = 0.68 M3

Jadi Jumlah Volume Adalah 0.68 M3


10 Err:509
P = 64
P = 12.28
V = 76.28 M3

Jadi Jumlah Volume Adalah 76.28 M3


13 Pek. Plat Canopy
P = 1.9
L = 1
T = 0.1
V = 0.19 X 5
V = 0.95 M3
Kanopy Ventilasi
A P = 5.6
L = 0.4
T = 0.1
V = 0.22 X 7
= 1.57 M3

B P = 3.4
L = 0.4
T = 0.1
V = 0.14 X 3
V = 0.41 M3

C P = 2.3
L = 0.4
V = 0.1 M3
V = 0.092 X 2
V = 0.184 M3

D P = 1.7
L = 0.28
T = 0.1
V = 0.05 X 2
V = 0.10 M3

JUMLAH V = 3.21 M3
Jadi Jumlah Volume Adalah 3.21 M3

Pek. Kolom Pada Kusen Jendela 10x25 TITIK


P = 3.35 X 20
V = 67 M1

Jadi Jumlah Volume Adalah 67.00 M1


Pekerjaan List Pfofil Pada Teras P = 20.82 M2
L = 0.1
V = 2.082 m2

Jadi Jumlah Volume Adalah 2.08 M2


GAMBAR SKETSA
D
90
C
B
A
120
140
Plat kanopi
PEKERJAAN : PERENCANAAN REHABILITASI BERAT KANTOR
LOKASI : JL. BANDARA HALUOLEO KENDARI

HITUNGAN GAMBA
PEKERJAAN DINDING
1 Pasangan Bata Merah 1 : 3 (Trasram) V = PXT - Lubang Kusen
Pinggir Bangunan P = 55.79
T = 0.3
V = 16.737

Lubang Kusen V = PXT


P1 = 1.02

V = 1.02
V = 16.737 - 1.02
V = 15.717 M2

Tras Tram Km/Wc Tinggi 1.6 m V = PXT - Lubang Kusen


P = 12.64
T = 1.6
V = 20.224 M2

Lubang Kusen V = PXT


P = 1.28 X 2
V = 2.56
V = 20.224 - 2.56
V = 17.664
V = 15.717 + 17.664
Jumlah Total V = 33.38 M2

Jadi Humlah Total Volume Adalah 33.38 m2


2 Pasangan Bata Merah 1 : 5, 1/2 bata V = PXT - Lubang Kusen
Dinding Luar A P = 59.45
T = 5.8
v = 344.81

Dindind Dalam B V = PXT


P = 11.2
T = 2.95
V = 33.04
= A+B
V = 377.85

Lubang Kusen V = PXT Jumlah Buah


2 P1 P = 3.655 X2 7.31
1 Lubang Pintu P2 P = 1.72 X1 1.72
2 Lubang Pintu P3 P = 1.47 X2 2.94
5 Lubang Jendela J1 P = 3.78 X5 18.9
7 Lubang Ventilasi v1 P = 1.3 X7 9.1
3 Lubang Ventilasi v2 P = 0.78 X3 2.34
3 Lubang Ventilasi v3 P = 0.52 X2 1.56
Lubang Ventilasi v4 P = 0.3 X3 0.9
Volume Lubang Kusen V = 43.87 M2 Lunag Kusen
V = 377.85 - 43.87
Volume Dinding Dikurang Luasan Lbg V = 333.98 M2

Pas Dinding A + B + C V = A+B - Dinding TrasRam 1 :3


V = 333.98 - 33.38
= 300.60 M2
Jadi Jumlah Total Volume Adalah 300.60 m2
3 Pek. Plesteran Tembok 1 : 3 V = (P X T ) / 2 SISI

Pas. Batu merah Dinding 1:3 x 2 sisih V = 33.38 X 2


V = 66.762 M2

Jadi Jumlah Total Volume Adalah 66.762 M2

4 Pek. Plesteran Tembok 1 : 5


V = (P X T ) / 2 SISI

Pas. Batu Dinding 1:5 X 2 Sisih V = 300.60 X 2


V = 601.20 M2

Jadi Jumlah Total Volume Adalah 601.20 M2


5 Err:509 V = PXT
A P = 4.4
T
V
=
=
=
5.8
25.52 M2 A
B V = PXT - Lubang Kusen
P = 4
T = 5.8
= 23.2 M2
V1 = 0.26 X 5 1.3
V4 = 0.39
Jumlah Lubang Kusen V = 1.69
V = 23.2 - 1.69
= 21.51

C
V = 23.20 M2

V = PXT
C P = 4.4
T = 5.8
V = 25.52

D V = PXT
P = 4.25
T = 3.13
V = 13.30 M2

E V = PXT
P = 4.25
T = 3.13
V = 13.30 M2
Lunang Kusen V1 = 0.26 X 5 1.3
V = 13.30 - 1.3
= 17.29 M2
Total Volume Dinding Alcopan V = 104.84 m2
Alcopan Pada Teras V = PXT
A P = 2.00
T = 2.85
V = 5.7 x 4

B
V
P
=
=
22.8
2.76
M2
A
T = 2
V = 5.52 X 2
V = 11.04 M2

C P = 10.12
T = 0.48
V = 4.8576 X 2
V = 9.7152 M2
Total Volume Alcopan Pada Teras V = A+B+C
= 43.56 M2
Jumlah = 148.39 m2

Jadi Jumlah Total Volume Adalah 148.39 m2


Err:509
V = PXL
BELAKANG P = 5.75
L = 0.93
V = 5.35 X 6
V = 32.09
SAMPING KIRI
A P = 5.75
L = 1.84
V = 10.58 M2
B P = 5.75
L = 2.3
V = 13.23 M2
SAMPING KANAN P = 5.75
L = 3.8
V = 21.85 M2
JUMLAH V = 51.00

Lubang Kusen V = PXL


VI = 2.34
V2 = 0.52
Jumlah V = V1 + V2 M2
= 2.34 + 0.52
= 2.86
V = 51.00 - 2.86
V = 48.14 M2

Jadi Jumlah Total Volume Adalah 48.14 M2


PEKERJAAN KUSEN PINTU DAN JENDELA
1 . Kusen Pintu, Jendela dan Ventilasi
V = PXTL = M3
KUSEN PINTU P2 P = 3.05 M1
KUSEN PINTU P3 P = 5.1 X 2
= 10.2 M1
VENTILASI KUSEN J1 P = 6.24 X 15
= 93.6 M1
VENTILASI KUSEN V1 P = 2.3 X 58
= 133.4 M1
VENTILASI KUSEN V4 P = 1.15 X 2
= 2.3
TOTAL JUMLAH PANJANG KUSEN V = V1 + v2 + v3
= 247.65 M1
V = PXTL = M3
P = 247.65
L = 0.06
T = 0.12
V = 1.78 M3
Jadi Jumlah Total Volume Adalah 1.78 M3
Err:509
P2 V = PXL
P = 5.3
L = 0.1
= 0.53
P3 V = PXL
P = 5.84
L = 0.08
= 0.47 X 2
= 0.93 M2
= 1.46 M2
Jadi Jumlah Total Volume Adalah 1.46 M2
2 Err:509
V = PXT X Jumlah Unit
JENDELA J1 P = 2.43 X
L = 0.41 V1
V = 0.9963 X 15
V = 14.9445 M2
VENTILAS V1 P = 0.56 X
L = 0.31
V = 0.1736 X 58
V = 10.0688 M2
VENTILASI V2 P = 0.41
L = 0.56
V = 0.2296 X 3
JUMLAH V = 0.6888 M2

V = 25.7021 M2
Jadi Jumlah Total Volume Adalah 25.70 M2
Err:509
PINTU P2 P = 0.925
PINTU P3 P = 1.85
P = 2.09
V = P1 + P2
P2
= 4.865 M2

Jadi Jumlah Total Volume Adalah 4.87 M2

Err:509
1 Err:509
K1 P = 64
KS1 P = 16
KS2 P = 32
JURAI KUDA-KUDA P = 39.8
Kuda- Kuda Nok P = 7.95
V = 159.75 M1

Jadi Jumlah Total Volume Adalah 159.75 M1

2 Err:509
P = 91 + 195.49
P = 286.49
= 286.49 X 2
= 572.98 M1

Jadi Jumlah Total Volume Adalah 572.98 M1


Err:509

A V = A+B XC
A = 22.15
B = 8
C = 8.15
= A + B
= 22.15 + 8
= 30.15 X C
= 30.15 X 8.15
= 245.72
B V = AXB
A = 14.15
B = 8.15
= A X B
= 14.15 X 8.15
= 115.3225 X

V = A + B
V = 245.72 + 115.32
V = 361.05 M2
Jadi Jumlah Total Volume Adalah 361.05 M2

1 Err:509
P V = M1
Rangka A P = 48 M1

Jadi Jumlah Total Volume Adalah 48.00 M1

Err:509

P = 22 X 2
V = 44
P = 14 X 2
V = 28
= 28 + 44
= 72 X
= 72 M2

Jadi Jumlah Total Volume Adalah 72.00 M2


INTERIOR RUANG KADIS
Err:509
A P = 18.33
L = 11.8
T = 0.05
V = 10.81 M3
B P = 3.8
L = 1.7
T = 0.05
V = 0.32 X 2
= 0.65 M3
C P = 1.83
L = 1.33
T = 0.05
V = 0.12

D P = 1.35
L = 1.48
T = 0.05
V = 0.10 M3

E P = 2.35
L = 1.33
T = 0.05
V = 0.16 M3
=
F P = 3.83
L = 1.48
T = 0.05
V = 0.28 M3

G P = 1.85
L = 1.33
T = 0.05
V = 0.12 M3
H P = 6
L = 2.5
T = 0.08
V = 1.20 M3

TOTAL JUMLAH V = 13.45 M3


Err:509
A P = 18.33
L = 11.8
= 216.294

B P = 3.8
L = 1.7
V = 6.46 X 2

C P = 1.35
L = 1.48
V = 2.00 M2

D P = 2.35
L = 1.33
V = 3.1255 M2

=
E P = 3.83
L = 1.48
V = 5.6684 M2
=
F P = 6
L = 2.5
V = 15 M2

Tegel Anak Tangga P = 1.93


L = 0.5
= 0.965 X 2
V = 1.93 M2
Total = 250.48

TOTAL JUMLAH V = 250.48 M2

Err:509
C P = 1.83
L = 1.33
V = 2.43 m2

G P = 1.85
L = 1.33
V = 2.4605 M2
V = 2.46 + 2.46
= 4.92 M2

TOTAL JUMLAH V = 4.92 M2


Err:509
V = M1
LUBAG PINTU
P = 73.50 - 5.9
= 67.60 m1

TOTAL JUMLAH V = 67.60 m1 67.60 M

n Partisi Dan Rak Dua Sisi Multipleks Lapis HPL


KUSEN PINTU P = 5.9
TANGGA PANGGUNG P = 15.44
= 15.44 + 5.9
= 21.34 M1

TOTAL JUMLAH V = 21.34 M1

Err:509
Tras Tram Km/Wc Tinggi 1.6 m V = PXT - Lubang Kusen
P = 12.64
T = 1.6
V = 20.224 M2

Lubang Kusen V = PXT


P = 1.28 X 2
V = 2.56
V = 20.224 - 2.56
V = 17.664

Pas Dinding Panggung


V = PXT
P = 6.4
T = 0.5
V = 3.2
V =
Jumlah Total V = 20.86 M2

TOTAL JUMLAH V = 20.86 M2


Err:509
3 Err:509
A P = 7.54
L = 1.05
V = 7.92

B P = 12
L = 3
L = 36.00

C P = 17
L = 1.5
V = 25.5 X 2
V = 51.00

D P = 8.8
L = 1.5
V = 13.20

E P = 48.16
L = 0.9
V = 43.344

F P = 11.41
L = 4.47
T = 51.0027 X 2
102.01

G P = 4.925
L = 4.47
V = 22.01 X 2
V = 44.03 M2

H P = 8.8
L = 1.75
V = 15.4 M2

I P = 1.85
L = 1.33
V = 2.4605 X 2
= 4.92 M2

J P = 2.35
L = 1.33
V = 3.1255 M2
K P = 1.85
L = 1.33
V = 2.4605 X 2
= 4.92 M2
Plafond Luar
P = 73.42
L = 0.8
V = 58.736 M2
Plafond Teras
P = 3.85
L = 1.7
V = 6.545 M2
Total Jumlah V = 391.14 - 0.90 X 9
391.14 - 8.1
= 383.04 M2

Jadi Jumlah Volume dalah 383.04 M2

Err:509
A P = 7.54
L = 1.05
V = 7.92

B P = 12
L = 3
L = 36.00
C P = 17
L = 1.5
V = 25.5 X 2
V = 51.00

D P = 9
L = 1.5
V = 13.50
E P = 48.16
L = 0.9
V = 43.344
F P = 11.41
L = 4.47
T = 51.0027 X 2
102.01

G P = 5.025
L = 4.47
V = 22.46 X 2
V = 44.92 M2
H P = 9
L = 1.75
V = 15.75 M2

I P = 1.85
L = 1.33
V = 2.4605 X 2
= 4.92 M2
J P = 2.35
L = 1.33
V = 3.1255 M2

K P = 1.85
L = 1.33
V = 2.4605 X 2
= 4.92 M2
Plafond Luar
P = 73.42
L = 0.8
V = 58.736 M2
Plafond Teras
P = 3.85
L = 1.7
V = 6.545 M2

Total Jumlah V = 392.69 - 8.1


= 384.59 M2

Jadi Jumlah Volume dalah 384.59 M2

Err:509
Plafond Dalam P = 100.18

Plafond Luar P = 64.95

v = 165.13 M1

Jadi Jumlah Volume dalah 165.13 M1


Err:509
V = PXLXT
Err:509 P = 79.80
L = 0.3
T = 0.35
V = 8.38 M3

Jadi Jumlah Volume adalah 8.38 M3

Urugan Pasir Keliling Bangunan V = PXLXT


P = 73.43
L = 0.9
T = 0.05
V = 3.30 M3

Jadi Jumlah Volume adalah 3.30 M3


Urugan Tanah Keliling Bangunan V = PXLXT
P = 73.43
L = 0.9
T = 0.15
V = 9.91 M3

Jadi Jumlah Volume adalah 9.91 M3


Pasangan Batu Gunung 1 : 3 + diaci dengan air semen
P = 79.80 M1

Jadi Jumlah Volume adalah 79.80 M1

Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5


V = PXLXT
P = 73.43
L = 0.9
T = 0.05
V = 3.30 M3

Jadi Jumlah Volume adalah 3.30 M3

PEKERJAAN PENGECETAN / FINISHING


1 Err:509
A V = (P X T ) / 2 SISI

Pas. Batu merah Dinding 1:3 x 2 sisih


V = 33.381 X 2
V = 66.762 M2

B V = (P X T ) / 2 SISI

Pas. Dinding 1:5 X 2 Sisih V = 300.60 X 2


V = 601.20 M2
V = A+B
V = 66.762 + 601.20
V = 667.96 M2

VOLUME DIMDING PLESTERAN PROFIL


VOLUME DINDING ALCOPAN
JUMLAH V = 48.14 M2
V = 148.39 M2
V = 196.53 M2

V = 667.96 - 196.53
V 471.43 M2

ALCOPA
N
ALCOPA
N
Jadi Jumlah Volume adalah 471.43 M2

Err:509

BELAKANG P = 5.75 BELAKA


L = 0.93
V = 5.35 X 6
V = 32.09
SAMPING KIRI
A P = 5.75
L = 1.84
V = 10.58 M2
B P = 5.75
L = 2.3
V = 13.23 M2
SAMPING KANAN P = 5.75
L = 3.8
V = 21.85 M2
JUMLAH V = 51.00

Lubang Kusen V = PXL


VI = 2.34
V2 = 0.52
Jumlah V = V1 + V2 M2
= 2.34 + 0.52
= 2.86
V = 51.00 - 2.86
V = 48.14 M2

Jadi Jumlah Total Volume Adalah 48.14 M2


2 Err:509
Rangka Dalam P = 274.11 m2

Rangka Luar P = 46.41


V = 320.52 M2

Jadi Jumlah Volume adalah 320.52 M2

Err:509 J1
3 V = PXT X Jumlah Unit
KUSEN P2 P = 0.89 X 1
V = 0.89 M2

V = PXT X Jumlah Unit


KUSEN P3 P = 0.87 X 2
V = 1.74 M2

V = PXT X Jumlah Unit


KUSEN J1 P = 1.037 X 15
V = 15.555 M2

V = PXT X Jumlah Unit


VENTILASI 1 P = 0.44 X 58
V = 25.52 M2

V = PXT X Jumlah Unit


VENTILASI 3 P = 0.48 X 2
V = 0.96 M2
TOTAL V = 44.67
Jadi Jumlah Total Volume Adalah 44.67 M2
Err:509
V = PXT X Jumlah Unit
KUSEN P2 P = 0.89 X 1
V = 0.89 M2

V = PXT X Jumlah Unit


KUSEN P3 P = 0.87 X 2
V = 1.74 M2

V = PXT X Jumlah Unit


KUSEN J1 P = 1.037 X 15
V = 15.555 M2

V = PXT X Jumlah Unit


VENTILASI 1 P = 0.44 X 58
V = 25.52 M2

V = PXT X Jumlah Unit


VENTILASI 3 P = 0.48 X 2
V = 0.96 M2
TOTAL V = 44.669
Jadi Jumlah Total Volume Adalah 44.67 M2

Pek. Pemb. Jalan masuk Kantor


V = PXLXT
P = 2.00
L = 1.40
T = 0.12
V = 0.34 x 2
V = 0.67 m3

Jadi Jumlah Total Volume Adalah 0.34 m3


GAMBAR SKETSA
B

E
B

BELAKANG

S.KIR A
I

S.KANAN
J1

V2
P2
P3 X 2
640
ALCOPA
N
ALCOPA
N

BELAKANG

S.KIR A
I
B

S.KANAN

V1
RENCANA ANGGARAN BIAYA
#REF! : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
#REF! : PERENCANAAN REHABILITASI BERAT WISMA MAKMUR LUAS BANGUNAN 127 M2
#REF! #REF!
#REF! #REF!

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
1
2
3
4
5
6

Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya)


I PEKERJAAN TANAH DAN PASIR
1 Galian tanah untuk pondasi 12.42 M3 -
2 Urugan Kembali Alur Pondasi 3.11 M3 -
3 Urugan Pasir Bawah Pondasi 0.69 M3
4 Pas.Batu Kosong 1.38 M3 -
5 Pek. Pas. Pondasi Batu Gunung 5.61 M3 -
Jumlah Harga Pekerjaan Tanah dan Pasir (Dipindahkan ke Rekapitulasi Biaya) -
II PEKERJAAN PONDASI DAN DINDING
1 Pek.Plesteran dinding bata 1:3 20.48 M2 -
2 Pek.Pas.dinding bata 1:3 40.96 M2 -
Jumlah Harga Pekerjaan Pondasi dan Dinding (Dipindahkan ke Rekapitulasi Biaya) -
III PEKERJAAN BETON
1 Pek. Sloof 15/20 2.30 M3 -
2 Pek. Kolom 15/25 0.51 M3 -
Jumlah Harga Pekerjaan Beton (Dipindahkan ke Rekapitulasi Biaya) -
IV PEKERJAAN PENGECETAN / FINISHING
1 Pek. Cat Tembok 40.96 M2 -
3 Pek. List Profil Pada Tembok 11.80 M1 -
4 Pembersihan Akhir / Finishing 1.00 Ls -
Jumlah Harga Pekerjaan Pengecatan / Finishing ( Dipindahkan ke Rekapitulasi Biaya ) -
RENCANA ANGGARAN BIAYA
### : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
### : PERENCANAAN REHABILITASI BERAT WISMA MAKMUR LUAS BANGUNAN 127 M2
### #REF!
### #REF!

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet Dan Bangsal Kerja (Disewa) 1.00 Ls 3,000,000.00 3,000,000.00
2 Pembongkaran Bangunan Lama/ Pembersihan Lokasi 1.00 Ls 5,000,000.00 5,000,000.00
3 Pemasangan Bouplank / Pengukuran Kembali 1.00 Ls 1,500,000.00 1,500,000.00
4 Air Kerja / P3K 1.00 Ls 1,500,000.00 1,500,000.00
5 Papan Nama Proyek 1.00 Ls 250,000.00 250,000.00
6 Aadministrasi / Foto Dokumentasi 1.00 Ls 3,000,000.00 3,000,000.00
Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya) 14,250,000.00
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Poor Plat 20.00 M3 #REF! #REF!
2 Pek. Galian Tanah Alur Pondasi 42.60 M3 #REF! #REF!
3 Urugan Kembali Alur Pondasi Poor Plat 5.00 M3 #REF! #REF!
4 Urugan Kembali Alur Pondasi 10.65 M3 #REF! #REF!
5 Urugan Tanah Alas Lantai 38.93 M3 #REF! #REF!
6 Urugan Pasir Alas Pondasi 3.360 M3 #REF! #REF!
7 Urugan Pasir Alas Lantai 59.93 M3 #REF! #REF!
Jumlah Harga Pekerjaan Tanah dan Pasir (Dipindahkan ke Rekapitulasi Biaya) #REF!
III PEKERJAAN PONDASI DAN BETON
1 Pasangan Batu Kosong 6.24 M3 #REF! #REF!
2 Pek. Pas Batu Gunung 1 : 5 13.89 M3 #REF! #REF!
3 Pek. Voort Plat 2.14 M3 #REF! #REF!
4 Pek. Sloof 15/20: 1pc :2ps :3kr 123.00 M1 #REF! #REF!
5 Pek. Kolom 20x20 Cm 3.52 M3 #REF! #REF!
6 Pek. Plat Beton 2.33 M3 #REF! #REF!
7 Pek.Kolom Praktis 15/15 1pc 2ps:3kr 88.00 M1 #REF! #REF!
8 Pek. Balok Latei 15/15 1pc : 2ps : 3kr 21.00 M1 #REF! #REF!
9 Pek.Ring Balok 15/15 1pc 2ps:3kr 116.50 M1 #REF! #REF!
10 Pek. Balok Latey 15 / 35 1.34 M3 #REF! #REF!
Jumlah Harga Pekerjaan Pondasi dan Dinding (Dipindahkan ke Rekapitulasi Biaya) #REF!
IV PEKERJAAN DINDING
1 Pasangan Bata Merah 1 : 3 (Trasram) 27.08 M2 #REF! #REF!
2 Pasangan Bata Merah 1 : 5, 1/2 bata 295.26 M2 #REF! #REF!
3 Pek. Plesteran Tembok 1 : 3 54.16 M2 #REF! #REF!
4 Pek. Plesteran Tembok 1 : 5 590.51 M2 #REF! #REF!
Jumlah Harga Pekerjaan Beton (Dipindahkan ke Rekapitulasi Biaya) #REF!
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pek. Kusen Pintu, Jendela dan Ventilasi 1.17 M3 #REF! #REF!
2 Pek. Bingkai Kaca Jendela, Pintu dan Ventilasi 4.70 M2 #REF! #REF!
3 Pek. Kaca 5 mm riben Pada Daun Jendela 8.35 M2 #REF! #REF!
4 Pek. Pintu Panil Jati 30.00 M2 #REF! #REF!
5 Pek. Angker Kusen Pintu dan Jendela. Besi 6 Mm 94.00 Bh 2,000.00 188,000.00
6 Pek. Newt-Newt Kusen Pintu 24.00 Tiang 5,000.00 120,000.00
7 Pek. Pasangan Kunci Pintu Utama 2.00 Bh #REF! #REF!
8 Pek. Pasangan Pintu Kunci Biasa 2 x Putar 10.00 Bh #REF! #REF!
9 Pek. Pasangan Engsel Jendela 14.00 Psg #REF! #REF!
10 Pek. Pasangan Engsel Pintu 12.00 Psg #REF! #REF!
11 Pek. Pasangan Grendel Jendela 14.00 Bh #REF! #REF!
12 Pek. Pasangan Grendel Pintu 12.00 Bh #REF! #REF!
13 Pek. Pasangan Hak Angin Jendela 14.00 Bh #REF! #REF!
Jumlah Harga Pekerjaan Kusen Pintu dan Jendela (Dipindahkan ke Rekapitulasi Biaya) #REF!
VI PEKERJAAN KAP DAN KUDA-KUDA
1 Pek. Kuda-kuda + Baja Ringan 266.40 M2 200,000.00 53,280,000.00
2 Pek. Pasangan Atap Almunium 0.55 278.16 M2 #REF! #REF!
3 Pek. Pasangan Nok Almunium 0.55 60.08 M' #REF! #REF!
4 Pek. Listplank 57.43 M' #REF! #REF!
5 Pek. Pasangan Talang 16.60 M' #REF! #REF!
Jumlah Harga Pekerjaan Kap dan Kuda-Kuda (Dipindahkan ke Rekapitulasi Biaya) #REF!
VII PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Rabat Beton 1pc : 3ps : 5kr, Alas Lantai 6.80 M3 #REF! #REF!
2 Pek. Lantai Keramik 40 x 40 Cm 125.00 M2 #REF! #REF!
3 Pek. Lantai Keramik 20 x 20 Cm Anti Slip (KM/WC) 11.25 M2 #REF! #REF!
4 Pek. Tegel Plin 20 Cm 138.00 M1 #REF! #REF!
5 Pek. Tegel Kuku 13.40 M1 #REF! #REF!
6 Pek. Dinding keramik pd km/wc 37.43 M2 #REF! #REF!
Jumlah Harga Pekerjaan Lantai dan Dinding Keramik (Dipindahkan ke Rekapitulasi Biaya) #REF!
VIII PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pek. Rangka Plafon Holo Aluminium 197.00 M2 #REF! #REF!
2 Pek. Plafon Gipsum 197.00 M2 #REF! #REF!
3 Pek. List Plafond Gipsum 286.50 M'1 #REF! #REF!
Jumlah Harga Pekerjaan Langit-Langit / Plafond (Dipindahkan ke Rekapitulasi Biaya) #REF!
IX PEKERJAAN INSTALASI LISTRIK
1 Pek. Pasangan Instalasi Titik Lampu 25.00 Ttk #REF! #REF!
2 Pek. Pasangan lampu Phillips 10 watt 5.00 Bh #REF! #REF!
3 Pek. Pasangan lampu Phillips 20 watt 15.00 Bh #REF! #REF!
4 Pek. Pasangan lampu Phillips 40 watt 3.00 Bh #REF! #REF!
5 Pek. Pasangan Saklar Tunggal "Broco" 12.00 Bh #REF! #REF!
6 Pek. Pasangan Saklar Ganda " Broco" 2.00 Bh #REF! #REF!
7 Pek. Pasangan Stop Kontak"Broco" 8.00 Bh #REF! #REF!
8 Pek. Pas MCB 1.00 Ls #REF! #REF!
Jumlah Harga Pekerjaan Instalasi Listrik (Dipindahkan ke Rekapitulasi Biaya) #REF!
X PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air Bersih Pipa 3/4" 15.00 M' #REF! #REF!
2 Pek. Pasangan Instalasi Air Kotor Pipa 3" 10.13 M' #REF! #REF!
3 Pek. Pas. Kloset Duduk lengkap 5.00 Bh #REF! #REF!
4 Pek. Pasangan Kran 6.00 Bh #REF! #REF!
5 Pek. Pasangan Bak Fibreglass 5.00 Bh 300,000.00 1,500,000.00
6 Pek. Pembuatan Septik Tank + Resapan 2.00 Unit 3,000,000.00 6,000,000.00
7 Pek. Floor Drain 5.00 Bh #REF! #REF!
8 Pek. Pas. Tempat Cuci Piring Stenlis 1 Lubang 1.00 Unit 700,000.00 700,000.00
9 Pek. Pemasangan Wastafel + Kaca 2.00 Bh #REF! #REF!
Jumlah Harga Pekerjaan Sanitair (Dipindahkan ke Rekapitulasi Biaya) #REF!
XI PEKERJAAN RABAT DAN SALURAN
1 Galian Tanah Selokan 6.15 M3 #REF! #REF!
2 Urugan Kembali Alur Galian 1.54 M3 #REF! #REF!
3 Urugan Pasir Selokan 0.82 M3 #REF! #REF!
4 Urugan Pasir Rabat Keliling Bangunan 1.44 M3 #REF! #REF!
5 Pasangan Batu Gunung 1 : 3 + diaci dengan air semen 41.00 M1 #REF! #REF!
6 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5 1.72 M3 #REF! #REF!
Jumlah Harga Pekerjaan Rabat dan Saluran (Dipindahkan ke Rekapitulasi Biaya) #REF!
XII PEKERJAAN PENGECETAN / FINISHING
1 Pek. Cat Tembok 644.67 M2 #REF! #REF!
2 Pek. Cat Plafond 197.00 M2 #REF! #REF!
3 Pek. Menggosok dan Mendempul Bidang Kayu 25.00 M2 #REF! #REF!
4 Pek. Cat Kilap Kusen, Pintu, Jendela dan lestplank 42.10 M2 #REF! #REF!
5 Pek. Relling dari stenlis steel Untuk Penyandang Cacat 3.00 M2 300,000.00 900,000.00
6 Pek. Relling dari stenlis steel Untuk Kamar Mandi 5.00 Bh 150,000.00 750,000.00
7 Pek. List Profil Pada Teras 5.00 M2 #REF! #REF!
8 Pek. Pemasangan Papan Nama Wisma 1.00 Ls 500,000.00 500,000.00
9 Pek. Tralis Jendela 14.00 Bh 250,000.00 3,500,000.00
10 Pek. Exabilitas pada dinding ruangan tamu dari Stenlis Stiil 19.00 M' 150,000.00 2,850,000.00
11 Pek. Pembuatan Jalan Masuk Wisma 0.18 Ls #REF! #REF!
12 Pembersihan Akhir / Finishing 1.00 Ls 2,000,000.00 2,000,000.00
Jumlah Harga Pekerjaan Pengecatan / Finishing (Dipindahkan ke Rekapitulasi Biaya) #REF!
XII PEKERJAAN SELASAR
1 Pek. Galian Tanah 15.40 M2 #REF! #REF!
2 Pek. Urugan Kembali Alur Pondasi 3.85 M2 #REF! #REF!
3 Pek. Urugan Pasir Alas Pondasi 3.08 M2 #REF! #REF!
4 Pek. Urugan Tanah Alas Lantai 18.90 M2 #REF! #REF!
5 Pek. Urugan Pasir Alas Lantai 6.30 M2 #REF! #REF!
6 Pek. Pasangan Batu Kosong 4.62 M3 #REF! #REF!
7 Pek. Pondasi Batu Gunung 1 : 5 7.70 M3 #REF! #REF!
8 Pek. Slof 15 x 20 Cm 63.50 M1 #REF! #REF!
9 Pek. Kolom 15 x 20 Cm 67.60 M' #REF! #REF!
10 Pek. Ring Balk 15 x 25 Cm 63.50 M' #REF! #REF!
11 Pek. Rangka Atap kuda- Kuda Baja Ringan 105.60 M2 200,000.00 21,120,000.00
12 Pek. Atap Spandek 110.00 M2 #REF! #REF!
13 Pek. Nok Atap Spandek 22.00 M1 #REF! #REF!
14 Pek. Lisplank 54.00 M1 #REF! #REF!
15 Pek. Rabat Lantai 1 : 3 : 5 2.20 M3 #REF! #REF!
16 Pek. Lantai Keramik Anti Slip 40 x 40 Cm 44.00 M2 #REF! #REF!
17 Pek Plesteran Kolom Dan Ring Balk 88.60 M2 #REF! #REF!
18 Pek. Pengecetan Kolom Dan Ring Balk 88.60 M2 #REF! #REF!
19 Pek Pengecetan List Plank 16.20 M2 #REF! #REF!
20 Pek. Drainase pada selasar 44.00 M' #REF! #REF!
21 Pek. Rabat 1 : 3 : 5 keliling selasar 1.54 M3 #REF! #REF!
22 Pembersihan Akhir / Finishing 1.00 Ls 1,500,000.00 1,500,000.00
Jumlah Harga Pekerjaan Selasar (Dipindahkan ke Rekapitulasi Biaya) #REF!
REKAPITULASI
#REF! : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
#REF! : PERENCANAAN REHABILITASI BERAT WISMA MAKMUR LUAS BANGUNAN 127 M2
#REF! #REF!
#REF! #REF!

No. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN Rp. 14,250,000.00

II. PEKERJAAN TANAH DAN PASIR Rp. #REF!

III. PEKERJAAN PONDASI DAN BETON Rp. #REF!

IV. PEKERJAAN DINDING Rp. #REF!

V. PEKERJAAN KAP DAN KUDA-KUDA Rp. #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA Rp. #REF!


###

VII. PEKERJAAN LANTAI DAN DINDING KERAMIK Rp. #REF!


###

VIII. PEKERJAAN LANGIT-LANGIT (PLAFOND) Rp. #REF!

IX. PEKERJAAN INSTALASI LISTRIK Rp. #REF!


X. PEKERJAAN SANITAIR Rp. #REF!
###

XI. PEKERJAAN RABAT DAN SALURAN Rp. #REF!

XII. PEKERJAAN PENGECETAN / FINISHING Rp. #REF!


XIII PEKERJAAN SELASAR Rp. #REF!
Real Cost Rp. #REF!
PPN 10% Rp. #REF!
#REF!
Perencanaan Teknis Rp. #REF!
Pengawasan Teknis Rp. #REF!
Pengelola Proyek Rp. #REF!
JUMLAH Rp. #REF!
Dibulatkan Rp. #REF!

Terbilang:"Tujuh Ratus Sembilan Puluh Dua Juta Delapan Ratus Sembilan puluh Ribu Rupiah"
Kendari, Februari 2015 ###
Mengetahui
CV. AZZA SURYA KONSULTAN Pembuat:

SUHADIONO Ir. SYARIFUDDIN TOMPO


Direktur Staf Teknik
RENCANA ANGGARAN BIAYA

KEGIATAN #REF!
PEKERJAAN : PEMBUATAN SALURAN DRAINASE GEDUNG GUEST HOUSE
LOKASI : JL. ARIFIN SUGIANTO
TAHUN ANGGARAN : 2012

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pemasangan Bouplank / Pengukuran Kembali 1.00 Ls 300,000.00 300,000.00
2 Air Kerja / P3K 1.00 Ls 300,000.00 300,000.00
3 Administrasi / Foto Dokumentasi 1.00 Ls 200,000.00 200,000.00
Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya) 800,000.00
II PEKERJAAN TANAH DAN BATU ;
1 Pek. Galian Tanah saluran air hujan 34.80 M3 26,000.00 904,800.00
2 Pek Urugan Kembalui Alur Pondasi 8.70 M 3
12,466.00 108,454.20
3 Pas. Batu Gunung 1 : 5 Pada Saluran Type A 93.06 M 3
749,890.00 69,781,951.31
4 Pek Plesteran 1 : 3 dilicin Saluran Type A 510.48 M2 39,397.20 20,111,482.66
5 Pek. Saluran Air Hujan Type B 3.00 M' #REF! #REF!
7 Pembersihan Akhir/Finishing 1.00 Ls 350,000.00 350,000.00
8 Pek. Penutup Saluran dari besi (GREEL) TYPE A 28.00 M' 200,000.00 5,600,000.00
9 Pek. Penutup Saluran dari besi (GREEL) TYPE B 4.50 M' 150,000.00 675,000.00
Jumlah Harga Pekerjaan (Dipindahkan ke Rekapitulasi Biaya) #REF!
RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI SEDANG / BERAT GEDUNG KANTOR
PEKERJAAN : PENATAAN HALAMAN RUMAH JABATAN WAKIL WALIKOTA KENDARI
LOKASI : JL. ARIFIN SUGIANTO
TAHUN ANGGARAN : 2012

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet 1.00 Ls 1,500,000.00 1,500,000.00
2 Pembersihan Lokasi 1.00 Ls 860,000.00 860,000.00
3 Pemasangan Bouplank / Pengukuran Kembali 1.00 Ls 300,000.00 300,000.00
4 Air Kerja / P3K 1.00 Ls 200,000.00 200,000.00
5 Papan Nama Proyek 1.00 Ls 200,000.00 200,000.00
6 Administrasi / Foto Dokumentasi 1.00 Ls 300,000.00 300,000.00
Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya) 3,360,000.00
II PEKERJAAN TANAH DAN PASIR
1 Galian Tanah untuk kesting, 36.87 M3 26,000.00 958,620.00
2 Urugan Kembali Alur Pondasi 23.24 M3 12,466.00 289,709.84
Jumlah Harga Pekerjaan Tanah dan Pasir (Dipindahkan ke Rekapitulasi Biaya) 1,248,329.84
III PEKERJAAN MENANAM BUNGA
1 pekerjaan pemasangan kenstin 55.50 M3 833,055.00 46,234,552.50
2 urungan tanah untuk taman 140.51 M3 52,250.00 7,341,647.50
3 Pek. Urugan Tanah pada area jalan penghubung 96.95 M3 52,250.00 5,065,637.50
4 Pek. Urugan pasir pada area jalan penghubung 19.39 M3 192,466.00 3,731,915.74
5 Pek. Rabat pada jalan penghubung 20.50 M3 841,195.00 17,244,497.50
7 Menanam bunga Merambat 194.26 m2 45,850.00 8,906,821.00
8 Menanam bunga Palem ekor tupai minimal tinggi bunga 1 M' 56.00 Phn 160,000.00 8,960,000.00
Jumlah Harga Pekerjaan Kuda-Kuda (Dipindahkan ke Rekapitulasi Biaya) 97,485,071.74
IV PEKERJAAN JALAN
1 Pekerjaan Pemasangan Paving blok 2,542.40 M2 181,120.00 460,479,488.00
2 Pek,. Pembersihan/ Finishing 1.00 LS 725,000.00 725,000.00
461,204,488.00
BACK UP DATA
0 : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
0 : PERENCANAAN REHABILITASI BERAT WISMA MAKMUR LUAS BANGUNAN 127 M2
0 : JL. BANDARA HALUOLEO KENDARI
0 : 2014

No VOLUME TERLAKSANA GAMBAR PEKERJAAN

A Pekerjaan Tanah Dan Pasir


1 Galian Tanah Pondasi (poer Plat)
P = 1
L = 16
T = 1.25
V = P X L X T
= 1 16 1.25
V 20.00
Jadi Volume Galian Tanah Voor Plat = 20.00 M3
1 Pek. Galian Tanah Alur Pondasi
P = 32
L = 0.8
T = 0.75
V = P X L X T
= 32 0.8 0.75
V 19.20
Jadi Volume Galian Tanah Alur Pondasi = 19.20 M3
3 Urugan Kembali Alur Pondasi Poor Plat
P = 16
L = 0.5
T = 0.75
V = P X L X T
= 16 0.5 0.75
V 6.00
Jadi Volume Urugan Alur Pondasi = 6.00 M3
3 Urugan Kembali Alur Pondasi
P = 32
L = 0.34
T = 0.75
V = P X L X T
= 32 0.34 0.75
V 8.16
Jadi Volume Urugan Alur Pondasi = 8.16 M3
4 Urugan Tanah Alas Lantai
P = 10
L = 12.977
T = 0.3
V = P X L X T
= 10 12.977 0.3
V 38.93
Jadi Volume Pekerjaan Urugan Tanah Alas Lantai = 38.93 M3
5 Urugan Pasir Alas Pondasi
P = 32
L = 0.7
T = 0.15
V = P X L X T
= 32 0.7 0.15
V 3.36
Jadi Volume Pekerjaan Urugan Pasir Alas Pondasi = 3.36 M3
6 Urugan Pasir Alas Lantai
P = 10
L = 19.977
T = 0.3
V = P X L X T
= 10 19.977 0.3
V 59.93
Jadi Volume Pekerjaan Urugan Pasir Alas Lantai = 59.93 M3
B Pekerjaan Pondasi Dan Beton
1 Pasangan Batu Kosong
P = 32
L = 0.8
A T = 0.15
V = P X L X T
= 32 0.8 0.15
V 3.84
= 3.84 M3

P = 1
L = 16
B T = 0.15
V = P X L X T
= 1 16 0.15
V 2.40
2.40 + 3.84
Jadi Volume Pekerjaan Pasangan Batu Kosong = 6.24 M3
2 Pek. Pas Batu Gunung 1 : 5
P = 32
L = 0.45
T = 0.6
V = P X L X T
= 32 0.45 0.6
V 8.64
Jadi Volume Pek. Pasangan Batu Gunung = 8.64 M3
3 PEK. VOOER PLAT
P = 0.5
L = 0.5
A T = 0.15
V = P X L X T
= 0.5 0.5 0.15
V 0.038 X 16
= 0.600

P = 0.8
L = 0.8
B T = 0.15
V = P X L X T
= 0.8 0.8 0.15
V 0.096 X 16
1.536
Volume A +B 0.60 + 1.54 = 2.14
Jadi Volume Pekerjaan Vooer Plat = 2.14 M3
4 Pek. Sloof 15/20: 1pc :2ps :3kr
P = 98

Jadi Volume Pekerjaan Sloef = 98 M'


5 Pek. Kolom 20x20 Cm
P = 80
L = 0.2
T = 0.2
V = P X L X T
= 80 0.2 0.2
V 3.20
Jadi Volume Pekerjaan Kolom = 3.20 M3
6 Pek. Plat Beton
P = 14
L = 0.7
T = 0.1
V = P X L X T
= 14 0.7 0.1
V 0.98
Jadi Volume Pekerjaan Plat Beton = 0.98 M3
7 Pek.Kolom Praktis 15/15 1pc 2ps:3kr
P = 64

Jadi Volume Pekerjaan Kolom Praktis = 64 M'


8 Pek. Balok Latei 15/15 1pc : 2ps : 3kr
P = 27

Jadi Volume Pekerjaan Kabel = 27 M'


9 Pek.Ring Balok 15/15 1pc 2ps:3kr
P = 98

Jadi Volume Pekerjaan Kabel = 98 M'


10 Pek. Balok Latey 15 / 25
P = 6.5
L = 0.15
T = 0.35
V = P X L X T
= 6.5 0.15 0.35
V 0.34
Jadi Volume Pekerjaan Kabel = 0.34 M3
C Pekerjaan Dinding
1 Pasangan Bata Merah 1 : 3 (Trasram)
P = 80.4
L = 0.3

V = P X L
= 80.4 0.3
V 24.12
Jadi Volume Pekerjaan Pasangan Bata Merah Trasram = 24.12 M2
2 Pasangan Bata Merah 1 : 5, 1/2 bata
P = 83.44
L = 3.4

V = P X L
= 83.44 3.4
V 283.70
Jadi Volume Pekerjaan Bata Merah 1:5 1/2 Bata = 283.70 M2
3 Pek. Plesteran Tembok 1 : 3
P = 160.8
L = 0.3

V = P X L
= 160.8 0.3
V 48.24
Jadi Volume Pekerjaan Plesteran Tembok 1:3 = 48.24 M2
4 Pek. Plesteran Tembok 1 : 5
P = 166.88
L = 3.4

V = P X L
= 166.88 3.4
V 567.39
Jadi Volume Pekerjaan Plesteran Tembok ! : 5 = 567.39 M2
D Pekerjaan Kusen Pintu Dan Jendela
1 Pek. Kusen Pintu, Jendela dan Ventilasi
P = 153.5
L = 0.06
T = 0.12
V = P X L X T
= 153.5 0.06 0.12
V 1.11
Jadi Volume Pekerjaan Kusen Pintu Dan Jendela = 1.11 M3
2 Pek. Bingkai Kaca Jendela, Pintu dan Ventilasi
P = 56.8
L = 0.08

V = P X L
= 56.8 0.08
V 4.54
Jadi Volume Pekerjaan Bingkai Kaca Jendela = 4.54 M2
3 Pek. Kaca 5 mm riben Pada Daun Jendela
P = 23.86
L = 0.35

V = P X L
= 23.86 0.35
V 8.35
Jadi Volume Pekerjaan Kaca 5 mm = 8.35 M2
4 Pek. Pintu Panil Jati
P = 33.33
L = 0.9

V = P X L
= 33.33 0.9
V 30.00
Jadi Volume Pekerjaan Pintu Panil Jati = 30.00 M2
E Pekerjaan Kap Dan Kuda-Kuda
1 Pek. Kuda-kuda + Baja Ringan
P = 12
L = 18.79

V = P X L
= 12 18.79
V 225.48
Jadi Volume Pekerjaan Kuda-Kuda Baja Ringan = 225.48 M2
2 Pek. Pasangan Atap Multi Roof
P = 12
L = 19.308

V = P X L
= 12 19.308
V 231.70
Jadi Volume Pekerjaan Atap Multi Roof = 231.70 M2
3 Pek. Pasangan Nok
P = 58.48

Jadi Volume Pekerjaan Skun Kabel cu 16 mm = 58.48 M'


4 Pek. Listplank
P = 61.16

Jadi Volume Pekerjaan Pentanahan Gardu = 61 M'


5 Pek. Pasangan Talang
P = 11

Jadi Volume Pekerjaan Pentanahan Gardu = 11.00 M'


F Pekerjaan Lantai Dan Dinding Keramik
1 Pek. Rabat Beton 1pc : 3ps : 5kr, Alas Lantai
P = 12
L = 10.81
T = 0.05
V = P X L X T
= 12 10.81 0.05
V 6.49
Jadi Volume Pekerjaan Rabat Lantai = 6.49 M3
2 Pek. Lantai Keramik 40 x 40 Cm
P = 12
L = 9.87

V = P X L
= 12 9.87
V 118.44
Jadi Volume Pekerjaan Keramik 40 x 40 = 118.44 M2
3 Pek. Lantai Keramik 20 x 20 Cm Anti Slip (KM/WC)
P = 2.25
L = 5

V = P X L
= 2.25 5
V 11.25
Jadi Volume Pekerjaan Dinding Keramik 20x20 = 11.25 M2
4 Pek. Tegel Plin 20 Cm
P = 120.8

V 120.80
Jadi Volume Pekerjaan Tegel Plin = 120.80 M1
5 Pek. Tegel Kuku
P = 13.4

V 13.40
Jadi Volume Pekerjaan Tegel Kuku = 13.40 M1
6 Pek. Dinding keramik pd km/wc
P = 24.95
L = 1.5

V = P X L
= 24.95 1.5
V 37.43
Jadi Volume Pekerjaan Tegel Kuku = 37.43 M2
G Pekerjaan Langit - Langit (Plafon)
1 Pek. Rangka Plafon Holo Aluminium
P = 10
L = 19.5

V = P X L
= 10 19.5
V 195.00
Jadi Volume Pekerjaan Rangka Plafon = 195.00 M2
2 Pek. Plafon Kalsi board
P = 10
L = 19.5

V = P X L
= 10 19.5
V 195.00
Jadi Volume Pekerjaan Plafon Kalsi Board = 195.00 M2
3 Pek. List Plafond
P = 257

V 257.00
Jadi Volume Pekerjaan Tegel Kuku = 257.00 M1
H Pekerjaan Sanitair
1 Pek. Pasangan Instalasi Air Bersih Pipa 3/4"
P = 32.00

V 32.00
Jadi Volume Pekerjaan Instalasi Air Bersih = 32.00 M1
2 Pek. Pasangan Instalasi Air Kotor Pipa 3"
P = 24.00

V 24.00
Jadi Volume Pekerjaan Instalasi Air Kotor Pipa 3 " = 24.00 M2
I Pekerjaan Rabat Dan Saluran
1 Galian Tanah Selokan
P = 58.74
L = 0.5
T = 0.3
V = P X L X T
= 58.74 0.5 0.3
V 8.81
Jadi Volume Pekerjaan Tanah Selokan = 8.81 M3
2 Urugan Kembali Alur Galian
P = 58.74
L = 0.06
T 0.3
V = P X L X T
= 58.74 0.06 0.3
V 1.06
Jadi Volume Pekerjaan Urugan Kembali = 1.06 M3
3 Urugan Pasir Selokan
P = 58.74
L = 0.5
T 0.04
V = P X L X T
= 58.74 0.5 0.04
V 1.17
Jadi Volume Pekerjaan Urugan Pasir Selokan = 1.17 M3
4 Urugan Pasir Rabat Keliling Bangunan
P = 58.74
L = 0.7
T 0.05
V = P X L X T
= 58.74 0.7 0.05
V 2.06
Jadi Volume Pekerjaan Pasir Rabat Keliling Bangunan = 2.06 M3
5 Pasangan Batu Gunung 1 : 3 + diaci dengan air semen
P = 58.74

V 58.74
Jadi Volume Pekerjaan Urugan Kembali = 58.74 M1
5 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5
P = 58.74
L = 0.7
T = 0.06
V = P X L X T
= 58.74 0.7 0.06
V 2.47
Jadi Volume Pekerjaan Urugan Kembali = 2.47 M3
J Pekerjaan Pengecetan / Finishing
1 Pek. Cat Tembok
P = 153.908
L = 4

V = P X L
= 153.91 4
V 615.63
Jadi Volume Pekerjaan Cat Tembok = 615.63 M2
2 Pek. Cat Plafond
P = 10
L = 19.5

V = P X L
= 10 19.5
V 195.00
Jadi Volume Pekerjaan Cat Plafon = 195.00 M2
3 Pek. Menggosok dan Mendempul Bidang Kayu
P = 5
L = 5

V = P X L
= 5 5
V 25.00
Jadi Volume Pekerjaan Menggosok Dan Mendempul Bidang kay = 25.00 M2
4 Pek. Cat Kilap Kusen, Pintu, Jendela dan lestplank
P = 81
L = 1

V = P X L
= 81 1
V 81.00
Jadi Volume Pekerjaan Men Cat Bidang kayu = 81.00 M2
5 Pek. List Profil Pada Teras
P = 6
L = 1
15.00
V = P X L
= 6 1
V 6.00
Jadi Volume Pekerjaan List Profil Pada Teras = 6.00 M2
K Pekerjaan Pembangunan Selasar
1 Pek. Galian Tanah
P = 41
L = 0.6
T = 0.4
V = P X L X
= 41 0.6 0.4
V 9.84
Jadi Volume Pekerjaan Galian Tanah = 9.84 M3
2 Pek. Urugan Kembali Alur Pondasi
P = 41
L = 0.6
T = 0.05
V = P X L X
= 41 0.6 0.05
V 1.23
Jadi Volume Pekerjaan Urugan Kembali Alur Pondasi = 1.23 M3
3 Pek. Urugan Pasir Alas Pondasi
P = 41
L = 0.1
T = 0.4
V = P X L X
= 41 0.1 0.4
V 1.64
Jadi Volume Pekerjaan Urugan Kembali Alur Pondasi = 1.64 M3
4 Pek. Urugan Tanah Alas Lantai
P = 20.5
L = 1.5
T = 0.2
V = P X L X
= 20.5 1.5 0.2
V 6.15
Jadi Volume Pekerjaan Urugan Tanah Alas Lantai = 6.15 M3
5 Pek. Urugan Pasir Alas Lantai
P = 20.5
L = 1.5
T = 0.05
V = P X L X
= 20.5 1.5 0.05
V 1.54
Jadi Volume Pekerjaan Urugan Pasir Alas Lantai = 1.54 M3
6 Pek. Pasangan Batu Kosong
P = 41
L = 0.6
T = 0.1
V = P X L X
= 41 0.6 0.1
V 2.46
Jadi Volume Pekerjaan Pasangan Batu Kosong = 2.46 M3
7 Pek. Pondasi Batu Gunung 1 : 5
P = 41
L = 0.3
T = 0.4
V = P X L X
= 41 0.3 0.4
V 4.92
Jadi Volume Pekerjaan Pondasi Batu Gunung 1 : 5 = 4.92 M3
8 Pek. Slof 15 x 20 Cm
P = 41

V 41.00
Jadi Volume Pekerjaan Sloef 15 X 20 = 41.00 M3
9 Pek. Kolom 15 x 20 Cm
P = 29.7

V 29.70
Jadi Volume Pekerjaan Kolom = 29.70 M3
10 Pek. Ring Balk 15 x 25 Cm
P = 37.5
L = 0.15
T = 0.25
V = P X L X
= 37.5 0.15 0.25
V 1.41
Jadi Volume Pekerjaan Ring Balk = 1.41 M'
11 Pek. Rangka Atap kuda- Kuda Baja Ringan
P = 17
L = 3.8

V = P X L X
= 17 3.8
V 64.60
Jadi Volume Pekerjaan Rangka Atap = 64.60 M2
12 Pek. Atap Spandek
P = 17
L = 4.1

V = P X L X
= 17 4.1
V 69.70
Jadi Volume Pekerjaan Atap Sakura Roof = 69.70 M2
13 Pek. Nok Atap Spandek
P = 17

= 17
V 17.00
Jadi Volume Pekerjaan Atap Sakura Roof = 17.00 M'
14 Pek. Lisplank
P = 54.00
= 54
V 54.00
Jadi Volume Pekerjaan Lisplank = 54.00 M'
15 Pek. Rabat Lantai 1 : 3 : 5
P = 17
L = 1.5
T = 0.07
V = P X L X T
= 17 1.5 0.07
V 1.79
Jadi Volume Pekerjaan Rabat Lantai = 1.79 M3
16 Pek. Lantai Keramik Anti Slip 40 x 40 Cm
P = 17
L = 1.5

V = P X L
= 17 1.5
V 25.50
Jadi Volume Pekerjaan Keramiik 40x40 = 25.50 M2
17 Pek Plesteran Kolom Dan Ring Balk
P = 42
L = 0.7

V = P X L
= 42 0.7
V 29.40
Jadi Volume Pekerjaan Plesteran = 29.40 M3
18 Pek. Pengecetan Kolom Dan Ring Balk
P = 42
L = 0.7

V = P X L
= 42 0.7
V 29.40
Jadi Volume Pekerjaan Pengecetan = 29.40 M3
19 Pek Pengecetan List Plank
P = 30
L = 0.3

V = P X L
= 30 0.3
V 9.00
Jadi Volume Pekerjaan Pengecetan Lisplang = 9.00 M3
RENCANA ANGGARAN BIAYA
### : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
### : PERENCANAAN REHABILITASI BERAT WISMA DAMAI LUAS BANGUNAN 116 M2
### #REF!
### #REF!

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet Dan Bangsal Kerja (Disewa) 1.00 Ls 2,500,000.00 2,500,000.00
2 Pembongkaran Bangunan Lama/ Pembersihan Lokasi 1.00 Ls 3,150,000.00 3,150,000.00
3 Pemasangan Bouplank / Pengukuran Kembali 1.00 Ls 1,000,000.00 1,000,000.00
4 Air Kerja / P3K 1.00 Ls 1,500,000.00 1,500,000.00
5 Papan Nama Proyek 1.00 Ls 300,000.00 300,000.00
6 Aadministrasi / Foto Dokumentasi 1.00 Ls 3,000,000.00 3,000,000.00
Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya) 11,450,000.00
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Poor Plat 19.20 M3 #REF! #REF!
2 Pek. Galian Tanah Alur Pondasi 13.65 M3 Err:509 Err:509
3 Urugan Kembali Alur Pondasi Poor Plat 4.80 M3 #REF! #REF!
4 Urugan Kembali Alur Pondasi 3.41 M3 Err:509 Err:509
5 Urugan Tanah Alas Lantai 27.20 M3 Err:509 Err:509
6 Urugan Pasir Alas Pondasi 2.490 M3 Err:509 Err:509
7 Urugan Pasir Alas Lantai 10.82 M3 Err:509 Err:509
Jumlah Harga Pekerjaan Tanah dan Pasir (Dipindahkan ke Rekapitulasi Biaya) #REF!
III PEKERJAAN PONDASI DAN BETON
1 Pasangan Batu Kosong 2.08 M3 Err:509 Err:509
2 Pek. Pas Batu Gunung 1 : 5 10.99 M3 Err:509 Err:509
3 Pek. Voort Plat 2.58 M3 Err:509 Err:509
4 Pek. Sloof 15/20: 1pc :2ps :3kr 94.30 M1 Err:509 Err:509
5 Pek. Kolom 20x20 Cm 4.89 M3 Err:509 Err:509
6 Pek. Plat Beton 2.30 M3 Err:509 Err:509
7 Pek.Kolom Praktis 15/15 1pc 2ps:3kr 22.30 M1 Err:509 Err:509
8 Pek. Balok Latei 15/15 1pc : 2ps : 3kr 14.00 M1 Err:509 Err:509
9 Pek.Ring Balok 15/15 1pc 2ps:3kr 94.30 M1 Err:509 Err:509
10 Pek. Balok Latey 15 / 35 0.39 M3 Err:509 Err:509
Jumlah Harga Pekerjaan Pondasi dan Dinding (Dipindahkan ke Rekapitulasi Biaya) Err:509
IV PEKERJAAN DINDING
1 Pasangan Bata Merah 1 : 3 (Trasram) 84.51 M2 Err:509 Err:509
2 Pasangan Bata Merah 1 : 5, 1/2 bata 295.26 M2 Err:509 Err:509
3 Pek. Plesteran Tembok 1 : 3 169.02 M2 Err:509 Err:509
4 Pek. Plesteran Tembok 1 : 5 590.52 M2 Err:509 Err:509
Jumlah Harga Pekerjaan Beton (Dipindahkan ke Rekapitulasi Biaya) Err:509
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pek. Kusen Pintu, Jendela dan Ventilasi 1.17 M3 Err:509 Err:509
2 Pek. Bingkai Kaca Jendela, Pintu dan Ventilasi 4.70 M2 Err:509 Err:509
3 Pek. Kaca 5 mm riben Pada Daun Jendela 8.35 M2 Err:509 Err:509
4 Pek. Pintu Panil Jati 20.45 M2 Err:509 Err:509
5 Pek. Angker Kusen Pintu dan Jendela. Besi 6 Mm 96.00 Bh 2,000.00 192,000.00
6 Pek. Newt-Newt Kusen Pintu 24.00 Tiang 5,000.00 120,000.00
7 Pek. Pasangan Kunci Pintu Utama 2.00 Bh #REF! #REF!
8 Pek. Pasangan Pintu Kunci Biasa 2 x Putar 10.00 Bh Err:509 Err:509
9 Pek. Pasangan Engsel Jendela 12.00 Psg #REF! #REF!
10 Pek. Pasangan Engsel Pintu 12.00 Psg Err:509 Err:509
11 Pek. Pasangan Grendel Jendela 12.00 Bh #REF! #REF!
12 Pek. Pasangan Grendel Pintu 12.00 Bh Err:509 Err:509
13 Pek. Pasangan Hak Angin Jendela 12.00 Bh #REF! #REF!
Jumlah Harga Pekerjaan Kusen Pintu dan Jendela (Dipindahkan ke Rekapitulasi Biaya) Err:509
VI PEKERJAAN KAP DAN KUDA-KUDA
1 Pek. Kuda-kuda + Baja Ringan 266.40 M2 200,000.00 53,280,000.00
2 Pek. Pasangan Atap Almanium 0.55 278.16 M2 Err:509 Err:509
3 Pek. Pasangan Nok Almanium 0.55 60.08 M' Err:509 Err:509
4 Pek. Listplank 57.43 M' #REF! #REF!
5 Pek. Pasangan Talang 16.60 M' #REF! #REF!
Jumlah Harga Pekerjaan Kap dan Kuda-Kuda (Dipindahkan ke Rekapitulasi Biaya) Err:509
VII PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Rabat Beton 1pc : 3ps : 5kr, Alas Lantai 6.80 M3 Err:509 Err:509
2 Pek. Lantai Keramik 40 x 40 Cm 119.31 M2 Err:509 Err:509
3 Pek. Lantai Keramik 20 x 20 Cm Anti Slip (KM/WC) 18.69 M2 Err:509 Err:509
4 Pek. Tegel Plin 20 Cm 107.86 M1 Err:509 Err:509
5 Pek. Tegel Kuku 5.50 M1 2,000,000.00 11,000,000.00
6 Pek. Dinding keramik pd km/wc 35.60 M2 Err:509 Err:509
Jumlah Harga Pekerjaan Lantai dan Dinding Keramik (Dipindahkan ke Rekapitulasi Biaya) Err:509
VIII PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pek. Rangka Plafon Holo Aluminium 194.88 M2 Err:509 Err:509
2 Pek. Plafon Gipsum 194.88 M2 Err:509 Err:509
3 Pek. List Plafond Gipsum 286.50 M'1 Err:509 Err:509
Jumlah Harga Pekerjaan Langit-Langit / Plafond (Dipindahkan ke Rekapitulasi Biaya) Err:509
IX PEKERJAAN INSTALASI LISTRIK
1 Pek. Pasangan Instalasi Titik Lampu 30.00 Ttk Err:509 Err:509
2 Pek. Pasangan lampu Phillips 10 watt 5.00 Bh #REF! #REF!
3 Pek. Pasangan lampu Phillips 20 watt 5.00 Bh #REF! #REF!
4 Pek. Pasangan lampu Phillips 40 watt 9.00 Bh #REF! #REF!
5 Pek. Pasangan Saklar Tunggal "Broco" 12.00 Bh #REF! #REF!
6 Pek. Pasangan Saklar Ganda " Broco" 2.00 Bh #REF! #REF!
7 Pek. Pasangan Stop Kontak"Broco" 8.00 Bh #REF! #REF!
8 Pek. Pas MCB 1.00 Ls #REF! #REF!
Jumlah Harga Pekerjaan Instalasi Listrik (Dipindahkan ke Rekapitulasi Biaya) Err:509
X PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air Bersih Pipa 3/4" 10.00 M' Err:509 Err:509
2 Pek. Pasangan Instalasi Air Kotor Pipa 3" 10.00 M' Err:509 Err:509
3 Pek. Pas. Kloset Duduk lengkap 5.00 Bh #REF! #REF!
4 Pek. Pasangan Kran 5.00 Bh Err:509 Err:509
5 Pek. Pasangan Bak Fibreglass 5.00 Bh 400,000.00 2,000,000.00
6 Pek. Pembuatan Septik Tank + Resapan 2.00 Ls 2,500,000.00 5,000,000.00
7 Pek. Floor Drain 5.00 Bh Err:509 Err:509
8 Pek.Pas. Tempat Cuci Piring Stenlis 2 Lubang 1.00 Unit 2,000,000.00 2,000,000.00
9 Pek. Pemasangan Wastafel + Kaca 2.00 Bh #REF! #REF!
Jumlah Harga Pekerjaan Sanitair (Dipindahkan ke Rekapitulasi Biaya) Err:509
XI PEKERJAAN RABAT DAN SALURAN Err:509
1 Galian Tanah Selokan 6.15 M3 Err:509 Err:509
2 Urugan Kembali Alur Galian 1.54 M3 #REF! #REF!
3 Urugan Pasir Selokan 0.82 M3 Err:509 Err:509
4 Urugan Pasir Rabat Keliling Bangunan 1.44 M3 Err:509 Err:509
5 Pasangan Batu Gunung 1 : 3 + diaci dengan air semen 41.00 M1 Err:509 Err:509
6 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5 1.72 M3 Err:509 Err:509
Jumlah Harga Pekerjaan Rabat dan Saluran (Dipindahkan ke Rekapitulasi Biaya) Err:509
XII PEKERJAAN PENGECETAN / FINISHING
1 Pek. Cat Tembok 759.54 M2 Err:509 Err:509
2 Pek. Cat Plafond 194.88 M2 Err:509 Err:509
3 Pek. Menggosok dan Mendempul Bidang Kayu 25.00 M2 Err:509 Err:509
4 Pek. Cat Kilap Kusen, Pintu, Jendela dan lestplank 42.10 M2 Err:509 Err:509
5 Pek. Relling dari stenlis steel Untuk Penyandang Cacat 3.00 M2 300,000.00 900,000.00
6 Pek. Relling dari stenlis steel Untuk Kamar Mandi 5.00 Bh 150,000.00 750,000.00
7 Pek. List Profil Pada Teras 6.00 M2 #REF! #REF!
8 Pek. Pemasangan Papan Nama Wisma 1.00 Ls 500,000.00 500,000.00
9 Pek. Tralis Jendela 12.00 Bh 250,000.00 3,000,000.00
10 Pek. Pas. Exbilitas dari Stanlist Steel 12.00 M' 200,000.00 2,400,000.00
11 Pek. Pemb. Jalan masuk Wisma 0.18 Ls Err:509 Err:509
12 Pembersihan Akhir / Finishing 1.00 Ls 1,000,000.00 1,000,000.00
Jumlah Harga Pekerjaan Pengecatan / Finishing (Dipindahkan ke Rekapitulasi Biaya) Err:509
XIII PEKERJAAN SELASAR
1 Pek. Galian Tanah 24.50 M2 Err:509 Err:509
2 Pek. Urugan Kembali Alur Pondasi 6.13 M2 Err:509 Err:509
3 Pek. Urugan Pasir Alas Pondasi 3.50 M2 Err:509 Err:509
4 Pek. Urugan Tanah Alas Lantai 7.11 M2 Err:509 Err:509
5 Pek. Urugan Pasir Alas Lantai 4.28 M2 Err:509 Err:509
6 Pek. Pasangan Batu Kosong 5.25 M3 Err:509 Err:509
7 Pek. Pondasi Batu Gunung 1 : 5 8.75 M3 Err:509 Err:509
8 Pek. Slof 15 x 20 Cm 63.50 M' Err:509 Err:509
9 Pek. Kolom 15 x 20 Cm 40.80 M' Err:509 Err:509
10 Pek. Ring Balk 15 x 25 Cm 2.37 M3 #REF! #REF!
11 Pek. Rangka Atap kuda- Kuda Baja Ringan 115.84 M2 200,000.00 23,168,000.00
12 Pek. Atap Spandek 124.00 M2 Err:509 Err:509
13 Pek. Nok Atap Spandek 27.00 M1 #REF! #REF!
14 Pek. Lisplank 63.56 M1 #REF! #REF!
15 Pek. Rabat Lantai 1.80 M3 #REF! #REF!
16 Pek. Lantai Keramik Anti Slip 40 x 40 Cm 43.05 M2 #REF! #REF!
17 Pek Plesteran Kolom Dan Ring Balk 69.51 M2 Err:509 Err:509
18 Pek. Pengecetan Kolom Dan Ring Balk 69.51 M2 Err:509 Err:509
19 Pek Pengecetan List Plank 19.07 M2 Err:509 Err:509
20 Pek. Drainase pada keliling Selasar 50.00 M' #REF! #REF!
21 Pek. Rabat pada Keliling selasar 27.95 Ls #REF! #REF!
22 Pembersihan Akhir / Finishing 1.00 Ls 500,000.00 500,000.00
Jumlah Harga Pekerjaan Selasar (Dipindahkan ke Rekapitulasi Biaya) Err:509
REKAPITULASI
#REF! : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
#REF! : PERENCANAAN REHABILITASI BERAT WISMA DAMAI LUAS BANGUNAN 116 M2
#REF! #REF!
#REF! #REF!

No. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN Rp. 11,450,000.00

II. PEKERJAAN TANAH DAN PASIR Rp. #REF!

III. PEKERJAAN PONDASI DAN BETON Rp. Err:509

IV. PEKERJAAN DINDING Rp. Err:509

V. PEKERJAAN KUSEN PINTU DAN JENDELA Rp. Err:509

VI. PEKERJAAN KAP DAN KUDA-KUDA Rp. Err:509


###

VII. PEKERJAAN LANTAI DAN DINDING KERAMIK Rp. #REF!


###

VIII. PEKERJAAN LANGIT-LANGIT (PLAFOND) Rp. #REF!

IX. PEKERJAAN INSTALASI LISTRIK Rp. Err:509


X. PEKERJAAN SANITAIR Rp. Err:509
###

XI. PEKERJAAN RABAT DAN SALURAN Rp. Err:509

XII. PEKERJAAN PENGECETAN / FINISHING Rp. Err:509


XIII PEKERJAAN SELASAR Rp. Err:509
Real Cost Rp. #REF!
PPN 10% Rp. #REF!
Perencanaan Teknis Rp. #REF!
Pengawasan Teknis Rp. #REF!
Pengelola Proyek Rp. #REF!
JUMLAH Rp. #REF!
Dibulatkan Rp. #REF!

Terbilang: "Delapan Ratus Dua Puluh Tiga Juta Lima Ratus Ribu Rupiah."
Kendari, Februari 2015 ###
Mengetahui
CV. AZZA SURYA KONSULTAN Pembuat:

SUHADIONO Ir. SYARIFUDDIN TOMPO


Direktur Staf Teknik
RENCANA ANGGARAN BIAYA
### : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
### : PERENCANAAN REHABILITASI BERAT WISMA BAHAGIA LUAS BANGUNAN 121 M2
### #REF!
### #REF!

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembuatan Direksi Keet Dan Bangsal Kerja (Disewa) 1.00 Ls 3,000,000.00 2,500,000.00
2 Pembongkaran Bangunan Lama/ Pembersihan Lokasi 1.00 Ls 5,000,000.00 3,500,000.00
3 Pemasangan Bouplank / Pengukuran Kembali 1.00 Ls 1,000,000.00 1,000,000.00
4 Air Kerja / P3K 1.00 Ls 1,500,000.00 1,170,000.00
5 Papan Nama Proyek 1.00 Ls 250,000.00 250,000.00
6 Aadministrasi / Foto Dokumentasi 1.00 Ls 4,000,000.00 4,000,000.00
Jumlah Harga Pekerjaan Persiapan (Dipindahkan ke Rekapitulasi Biaya) 12,420,000.00
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Poor Plat 19.20 M3 #REF! #REF!
2 Pek. Galian Tanah Alur Pondasi 13.65 M3 Err:509 Err:509
3 Urugan Kembali Alur Pondasi Poor Plat 4.80 M3 #REF! #REF!
4 Urugan Kembali Alur Pondasi 3.41 M3 Err:509 Err:509
5 Urugan Tanah Alas Lantai 27.20 M3 Err:509 Err:509
6 Urugan Pasir Alas Pondasi 2.490 M3 Err:509 Err:509
7 Urugan Pasir Alas Lantai 10.82 M3 Err:509 Err:509
Jumlah Harga Pekerjaan Tanah dan Pasir (Dipindahkan ke Rekapitulasi Biaya) #REF!
III PEKERJAAN PONDASI DAN BETON
1 Pasangan Batu Kosong 2.08 M3 Err:509 Err:509
2 Pek. Pas Batu Gunung 1 : 5 10.99 M3 Err:509 Err:509
3 Pek. Voort Plat 2.58 M3 Err:509 Err:509
4 Pek. Sloof 15/20: 1pc :2ps :3kr 94.30 M1 Err:509 Err:509
5 Pek. Kolom 20x20 Cm 4.89 M3 Err:509 Err:509
6 Pek. Plat Beton 2.30 M3 Err:509 Err:509
7 Pek.Kolom Praktis 15/15 1pc 2ps:3kr 22.30 M1 Err:509 Err:509
8 Pek. Balok Latei 15/15 1pc : 2ps : 3kr 14.00 M1 Err:509 Err:509
9 Pek.Ring Balok 15/15 1pc 2ps:3kr 94.30 M1 Err:509 Err:509
10 Pek. Balok Latey 15 / 35 0.39 M3 Err:509 Err:509
Jumlah Harga Pekerjaan Pondasi dan Dinding (Dipindahkan ke Rekapitulasi Biaya) Err:509
IV PEKERJAAN DINDING
1 Pasangan Bata Merah 1 : 3 (Trasram) 84.51 M2 Err:509 Err:509
2 Pasangan Bata Merah 1 : 5, 1/2 bata 295.26 M2 Err:509 Err:509
3 Pek. Plesteran Tembok 1 : 3 169.02 M2 Err:509 Err:509
4 Pek. Plesteran Tembok 1 : 5 590.52 M2 Err:509 Err:509
Jumlah Harga Pekerjaan Beton (Dipindahkan ke Rekapitulasi Biaya) Err:509
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pek. Kusen Pintu, Jendela dan Ventilasi 1.17 M3 Err:509 Err:509
2 Pek. Bingkai Kaca Jendela, Pintu dan Ventilasi 4.70 M2 Err:509 Err:509
3 Pek. Kaca 5 mm riben Pada Daun Jendela 8.35 M2 Err:509 Err:509
4 Pek. Pintu Panil Jati 20.45 M2 Err:509 Err:509
5 Pek. Angker Kusen Pintu dan Jendela. Besi 6 Mm 136.00 Bh 2,000.00 272,000.00
6 Pek. Newt-Newt Kusen Pintu 24.00 Tiang 5,000.00 120,000.00
7 Pek. Pasangan Kunci Pintu Utama 2.00 Bh #REF! #REF!
8 Pek. Pasangan Pintu Kunci Biasa 2 x Putar 10.00 Bh Err:509 Err:509
9 Pek. Pasangan Engsel Jendela 14.00 Psg #REF! #REF!
10 Pek. Pasangan Engsel Pintu 12.00 Psg Err:509 Err:509
11 Pek. Pasangan Grendel Jendela 14.00 Bh #REF! #REF!
12 Pek. Pasangan Grendel Pintu 12.00 Bh Err:509 Err:509
13 Pek. Pasangan Hak Angin Jendela 14.00 Bh #REF! #REF!
Jumlah Harga Pekerjaan Kusen Pintu dan Jendela (Dipindahkan ke Rekapitulasi Biaya) Err:509
VI PEKERJAAN KAP DAN KUDA-KUDA
1 Pek. Kuda-kuda + Baja Ringan 266.40 M2 200,000.00 53,280,000.00
2 Pek. Pasangan Atap Almanium 0.55 278.16 M2 Err:509 Err:509
3 Pek. Pasangan Nok Almanium 0.55 60.08 M' Err:509 Err:509
4 Pek. Listplank 57.43 M' #REF! #REF!
5 Pek. Pasangan Talang 16.60 M' #REF! #REF!
Jumlah Harga Pekerjaan Kap dan Kuda-Kuda (Dipindahkan ke Rekapitulasi Biaya) Err:509
VII PEKERJAAN LANTAI DAN DINDING KERAMIK
1 Pek. Rabat Beton 1pc : 3ps : 5kr, Alas Lantai 6.80 M3 Err:509 Err:509
2 Pek. Lantai Keramik 40 x 40 Cm 119.31 M2 Err:509 Err:509
3 Pek. Lantai Keramik 20 x 20 Cm Anti Slip (KM/WC) 18.69 M2 Err:509 Err:509
4 Pek. Tegel Plin 20 Cm 120.80 M1 Err:509 Err:509
5 Pek. Tegel Kuku 107.86 M1 2,000,000.00 215,720,000.00
6 Pek. Dinding keramik pd km/wc 35.60 M2 Err:509 Err:509
Jumlah Harga Pekerjaan Lantai dan Dinding Keramik (Dipindahkan ke Rekapitulasi Biaya) Err:509
VIII PEKERJAAN LANGIT-LANGIT (PLAFOND)
1 Pek. Rangka Plafon Holo Aluminium 195.00 M2 Err:509 Err:509
2 Pek. Plafon Gipsum 195.00 M2 Err:509 Err:509
3 Pek. List Plafond Gipsum 257.00 M'1 Err:509 Err:509
Jumlah Harga Pekerjaan Langit-Langit / Plafond (Dipindahkan ke Rekapitulasi Biaya) Err:509
IX PEKERJAAN INSTALASI LISTRIK
1 Pek. Pasangan Instalasi Titik Lampu 30.00 Ttk Err:509 Err:509
2 Pek. Pasangan lampu Phillips 10 watt 5.00 Bh #REF! #REF!
3 Pek. Pasangan lampu Phillips 20 watt 5.00 Bh #REF! #REF!
4 Pek. Pasangan lampu Phillips 40 watt 3.00 Bh #REF! #REF!
5 Pek. Pasangan Saklar Tunggal "Broco" 12.00 Bh #REF! #REF!
6 Pek. Pasangan Saklar Ganda " Broco" 2.00 Bh #REF! #REF!
7 Pek. Pasangan Stop Kontak"Broco" 8.00 Bh #REF! #REF!
8 Pek. Pas MCB 2.00 Ls #REF! #REF!
Jumlah Harga Pekerjaan Instalasi Listrik (Dipindahkan ke Rekapitulasi Biaya) Err:509
X PEKERJAAN SANITAIR
1 Pek. Pasangan Instalasi Air Bersih Pipa 3/4" 10.00 M' Err:509 Err:509
2 Pek. Pasangan Instalasi Air Kotor Pipa 3" 10.00 M' Err:509 Err:509
3 Pek. Pas. Kloset Duduk lengkap 5.00 Bh #REF! #REF!
4 Pek. Pasangan Kran 7.00 Bh Err:509 Err:509
5 Pek. Pasangan Bak Fibreglass 5.00 Bh 300,000.00 1,500,000.00
6 Pek. Pembuatan Septik Tank + Resapan 2.00 Ls 2,240,000.00 4,480,000.00
7 Pek. Floor Drain 5.00 Bh Err:509 Err:509
8 Pek. Pas.Tempat Cuci Piring Stanlis 2 Lubang 1.00 Unit 2,000,000.00 2,000,000.00
9 Pek. Pemasangan Wastafel + Kaca 2.00 Bh #REF! #REF!
Jumlah Harga Pekerjaan Sanitair (Dipindahkan ke Rekapitulasi Biaya) Err:509
XI PEKERJAAN RABAT DAN SALURAN
1 Galian Tanah Selokan 6.15 M3 Err:509 Err:509
2 Urugan Kembali Alur Galian 1.54 M3 #REF! #REF!
3 Urugan Pasir Selokan 0.82 M3 Err:509 Err:509
4 Urugan Pasir Rabat Keliling Bangunan 1.44 M3 Err:509 Err:509
5 Pasangan Batu Gunung 1 : 3 + diaci dengan air semen 41.00 M1 Err:509 Err:509
6 Pek. Rabat Beton Keliling Bangunan 1 : 3 : 5 1.72 M3 Err:509 Err:509
Jumlah Harga Pekerjaan Rabat dan Saluran (Dipindahkan ke Rekapitulasi Biaya) Err:509
XII PEKERJAAN PENGECETAN / FINISHING
1 Pek. Cat Tembok 759.54 M2 Err:509 Err:509
2 Pek. Cat Plafond 195.00 M2 Err:509 Err:509
3 Pek. Menggosok dan Mendempul Bidang Kayu 25.00 M2 Err:509 Err:509
4 Pek. Cat Kilap Kusen, Pintu, Jendela dan lestplank 42.10 M2 Err:509 Err:509
5 Pek. Relling dari stenlis steel Untuk Penyandang Cacat 3.00 M2 300,000.00 900,000.00
6 Pek. Relling dari stenlis steel Untuk Kamar Mandi 5.00 Bh 150,000.00 750,000.00
7 Pek. Tralis Jendela 12.00 Bh 250,000.00 3,000,000.00
8 Pek. List Profil Pada Teras 6.00 M2 #REF! #REF!
9 Pek. Pemasangan Papan Nama Wisma 1.00 Ls 500,000.00 500,000.00
10 Pek. Exabilitas dari Stalit Steel 12.00 M' 150,000.00 1,800,000.00
11 Pek. Pembuatan jalan masuk Wisma 0.22 Ls Err:509 Err:509
12 Pembersihan Akhir / Finishing 1.00 Ls 3,000,000.00 3,000,000.00
Jumlah Harga Pekerjaan Pengecatan / Finishing (Dipindahkan ke Rekapitulasi Biaya) Err:509
REKAPITULASI
### : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
### : PERENCANAAN REHABILITASI BERAT WISMA BAHAGIA
### #REF!
### #REF!

No. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN Rp. 12,420,000.00

II. PEKERJAAN TANAH DAN PASIR Rp. #REF!

III. PEKERJAAN PONDASI DAN BETON Rp. Err:509

IV. PEKERJAAN DINDING Rp. Err:509

V. PEKERJAAN KAP DAN KUDA-KUDA Rp. Err:509

VI. PEKERJAAN KUSEN PINTU DAN JENDELA Rp. Err:509


###

VII. PEKERJAAN LANTAI DAN DINDING KERAMIK Rp. Err:509


###

VIII. PEKERJAAN LANGIT-LANGIT (PLAFOND) Rp. Err:509

IX. PEKERJAAN INSTALASI LISTRIK Rp. Err:509


X. PEKERJAAN SANITAIR Rp. Err:509
###

XI. PEKERJAAN RABAT DAN SALURAN Rp. Err:509

XII PEKERJAAN PENGECATAN/FINIDHING Rp. Err:509

XIII. PEKERJAAN SELASAR Rp. #REF!


Real Cost Rp. #REF!
PPN 10% Rp. #REF!
Perencanaan Teknis Rp. #REF!
Pengawasan Teknis Rp. #REF!
Pengelola Proyek Rp. #REF!
JUMLAH Rp. #REF!
Dibulatkan Rp. #REF!

Terbilang : "Tujuh Ratus Dua Puluh Tujuh Juta Dua Ratus Empat Puluh Ribu Rupiah."
Kendari, Februari 2015 ###
Mengetahui
CV. AZZA SURYA KONSULTAN Pembuat:

SUHADIONO Ir. SYARIFUDDIN TOMPO


Direktur Staf Teknik
REKAPITULASI
#REF! : BELANJA MODAL GEDUNG DAN BANGUNAN WISMA PSTW MINAULA KENDARI
#REF! : PERENCANAAN REHABILITASI BERAT WISMA PSTW MINAULA KENDARI
#REF! #REF!
#REF! #REF!

No. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN WISMA MAKMUR Rp. 792,890,000.00


II. PEKERJAAN WISMA FLAMBOYAN Rp. 793,290,000.00
III. PEKERJAAN WISMA AMAN Rp. 793,290,000.00
IV PEKERJAAN WISMA ABADI Rp. 792,890,000.00
V PEKERJAAN WISMA SENTOSA Rp. 798,530,000.00
VI PEKERJAAN WISMA BAHAGIA Rp. 727,240,000.00
VII PEKERJAAN WISMA DAMAI Rp. 823,500,000.00
VIII PEKERJAAN WISMA BOUGENVILLE Rp. 698,420,000.00
IX PEKERJAAN BANGUNAN PERAWATAN KHUSUS Rp. 516,920,000.00
X PEKERJAAN POS SEKURITY 2 (DUA ) UNIT Rp. 103,480,000.00
XI GAPURA PINTU MASUK DAN KELUAR Rp. 79,072,000.00
XII PEMBANGUNAN POLIKLINIK Rp. 250,000,000.00
XIII PEMBANGUNAN GEDUNG KETERAMPILAN Rp. 531,170,000.00
XIV REHAB. RUMAH PETUGAS TYPE 36, 2 (DUA)UNIT Rp. 552,220,000.00
XV REHAB.RUMAH PETUGAS TYPE 54 Rp. 270,400,000.00
XVI REHAB.RUMAH PETUGAS TYPE57 Rp. 291,600,000.00
XVII PEMBANGUNAN GAPURA 2 (DUA ) UNIT Rp. 79,072,000.00
XVIII PEMBUATAN PAPAN NAMA PSTW MINAULA KENDARI Rp. 30,927,000.00
XIX PEMBANGUNAN GEDUNG SERBA GUNA Rp. 550,010,000.00
XX PEMBANGUNAN GUDANG Rp. 531,170,000.00
XXI PEMBANGUNAN TOWER Rp. 272,105,000.00
XXII REHABILITASI BERAT KANTOR Rp. 1,421,590,000.00
XXIII REHABILITASI BERAT AULA Rp. 1,250,000,000.00
XXIV PEMBANGUNAN MESJID Rp. 250,000,000.00
XXV PEKERJAAN PEMBANGUNAN DAPUR UMUM PSTW Rp. 776,860,000.00

Real Cost Rp. 13,976,646,000.00

Dibulatkan Rp. 13,976,600,000.00

Terbilang:
Tiga Belas Milyar Sembilan Ratus Tujuh Puluh Enam Juta Enam Ratus Ribu Rupiah"
Kendari, Ferbruari 2015 ###
Mengetahui
CV. AZZA SURYA KONSULTAN Pembuat:

SUHADIONO Ir. SYARIFUDDIN TOMPO


Direktur Staf Teknik

DISETUJUI;
PANTI SOSIAL TRESNA WERDHA DINAS PU. PROV. SULTRA.
MINAULA KENDARI. BAGIAN CIPTA KARYA
KEPALA UNSUR TEHNIK.

H.ARIFUDDIN M.SH. LA LIUSU ST.


Nip.: 1958 0308 1980 03 1010 Nip.: 19790908 200803 1001
RENCANA ANGGARAN BIAYA

PEKERJAAN : INTERIOR KANTOR DINAS PEKERJAAN UMUM BINA MARGA SULAWESI TENGGARA

LOKASI : KOTA KENDARI

TAHUN : 2019

HARGA JUMLAH
NO. URAIAN PEKERJAAN SPESIFIKASI VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 6
I INTERIOR KORIDOR LANTAI SATU
1 Pek. Pemasangan Partisi Dua Sisi Multipleks Lapis HPL Multipleks 8 mm
HPL Taco
24.74 M2 Rp 1,500,000.00 Rp 37,110,000.00
Lem Fox 168
Skrub
Jumlah Rp 37,110,000.00
II INTERIOR RESEPSIONIST
1 Pek. Meja Resepsionist Multipleks 15 mm
HPL Taco 3.5 M2 Rp 2,500,000.00 Rp 8,750,000.00
Lem Fox 168
Skrub
2 Pek. Pemasangan Backdroob Multipleks Lapis HPL Multipleks 8 mm
HPL Taco 7 M2 Rp 1,050,000.00 Rp 7,350,000.00
Lem Fox 168
Skrub
3 Pek. Pemasangan Huruf Acrylic 3mm
Lem Fox 168 68 Bh Rp 85,000.00 Rp 5,780,000.00
Busa 10 mm
4 Pek. Pemasangan Logo Acrylic 3mm
Lem Fox 168 1 Ls Rp 2,000,000.00 Rp 2,000,000.00
Busa 10 mm
Jumlah Rp 23,880,000.00
III INTERIOR KORIDOR LANTAI DUA
1 Pek. Pemasangan Partisi Dua Sisi Multipleks Lapis HPL Multipleks 8 mm
HPL Taco
17.64 M2 Rp 1,500,000.00 Rp 26,460,000.00
Lem Fox 168
Skrub
2 Pek.Pemasangan Kusen Dan Pintu Almunium Kaca 5mm
Open Back
Skrub
1 Ls Rp 3,000,000.00 Rp 3,000,000.00
Lem Silicon
Engsel Kupu-kupu
Heandle
Jumlah Rp 29,460,000.00
REAL COST Rp 90,450,000.00
PPN 10% Rp 9,045,000.00

JUMLAH Rp 99,495,000.00

DIBULATKAN Rp 99,400,000.00

Terbilang:
"Sembilan Puluh Semblan Juta Empat Ratus Ribu Rupiah"