Anda di halaman 1dari 4

REKAPITULASI ANGGARAN BIAYA

NAMA PROYEK PEMBANGUNAN BENGKEL 2 LANTAI


OWNER BAPAK IRWANTO
LOKASI JL.NANTONGGA DSN.TABING Kp.GADANG
TAHUN 2023

NO URAIAN PEKERJAAN HARGA


A PEKERJAAN PERSIAPAN Rp 50,443,499.00

LANTAI 1
I PEKERJAAN TANAH Rp 28,002,184.46
II PEKERJAAN ARSITEKTURAL - DINDING Rp 143,814,247.21
III PEKERJAAN ARSITEKTURAL - LANTAI Rp 63,180,963.44
IV PEKERJAAN SRUKTURAL Rp 177,403,206.19
VI PEKERJAAN ARSITEKTURAL PINTU DAN JENDELA Rp 26,661,034.02
VII PEKERJAAN PLUMBING Rp 14,255,108.06
VIII PEKERJAAN ELEKTRIKAL Rp 14,662,680.00
IX PEKERJAAN SANITAIR Rp 1,275,290.00
X PEKERJAAN LAIN LAIN Rp 1,262,352.00
LANTAI 2
I PEKERJAAN ARSITEKTURAL - DINDING Rp 46,857,047.68
II PEKERJAAN ARSITEKTURAL - LANTAI Rp 10,150,370.55
III PEKERJAAN SRUKTURAL Rp 64,086,240.27
IV PEKERJAAN ARSITEKTURAL - PLAFOND DAN ATAP Rp 245,631,045.77
V PEKERJAAN ARSITEKTURAL PINTU DAN JENDELA Rp 4,933,480.39
VI PEKERJAAN ELEKTRIKAL Rp 4,596,560.00
VII PEKERJAAN LAIN LAIN Rp 20,755,750.68
JUMLAH HARGA Rp 917,971,059.71
PPN 0.00 % Rp 0.00
TOTAL HARGA Rp 917,971,059.71
DIBULATKAN Rp 917,971,000.00

TERBILANG: Sembilan Ratus Tujuhbelas Juta Sembilan Ratus Tujuh Puluh Satu Ribu Rupiah
RENCANA ANGGARAN BIAYA

NAMA PROYEK PEMBANGUNAN BENGKEL 2 LANTAI


OWNER BAPAK IRWANTO
LOKASI JL.NANTONGGA DSN.TABING Kp.GADANG
TAHUN 2023

NO URAIAN PEKERJAAN TOTAL VOLUME SATUAN HARGA SATUAN HARGA

A PEKERJAAN PERSIAPAN
I PEKERJAAN PERSIAPAN Rp 50,443,499.00
1 Listrik Kerja 1.00 ls Rp 26,138,100.00 Rp 26,138,100.00
2 Air Kerja 1.00 ls Rp 5,580,420.00 Rp 5,580,420.00
3 Pekerjaan Mob Demoob 1.00 Ls Rp 2,000,000.00 Rp 2,000,000.00
4 Pekerjaan Pembersihan Lapangan 300.75 m2 Rp 15,380.00 Rp 4,625,535.00
5 Pembuatan Bouwplank 80.15 m1 Rp 150,960.00 Rp 12,099,444.00
B LANTAI 1
I PEKERJAAN TANAH Rp 28,002,184.46
1 Galian tanah untuk Pondasi 22.40 m3 Rp 17,700.00 Rp 396,480.00
2 Urugan tanah kembali 15.40 m3 Rp 52,660.00 Rp 810,964.00
3 Urugan Pasir bawah pondasi 1.40 m3 Rp 235,480.00 Rp 329,672.00
4 Pek. Timbunan Sirtu Peninggi Lantai t = 20cm 57.78 m3 Rp 219,640.00 Rp 12,690,359.92
5 Urugan pasir padat bawah rabat lantai bangunan 14.44 m3 Rp 235,480.00 Rp 3,401,390.86
6 Rabat Lantai Beton Tb. 5 cm 14.44 m3 Rp 718,150.00 Rp 10,373,317.68
II PEKERJAAN ARSITEKTURAL - DINDING Rp 143,814,247.21
1 Pasangan bata merah 1Pc : 5Ps 339.21 m2 Rp 98,170.00 Rp 33,299,803.94
2 Plesteran Halus 1 PC : 5 Ps 678.41 m2 Rp 72,120.00 Rp 48,927,001.32
3 Pasangan bata merah 1Pc : 3Ps KM/WC 23.14 m2 Rp 103,040.00 Rp 2,384,345.60
4 Plesteran Halus 1 PC : 3 Ps(transraam) 32.38 m2 Rp 61,570.00 Rp 1,993,636.60
5 Pekerjaan Acian 710.79 m2 Rp 36,430.00 Rp 25,894,116.13
6 Pekerjaan Benangan 22.50 m1 Rp 17,280.00 Rp 388,800.00
7 Pas. Keramik Dinding KM/WC 25x40 Polish 13.90 m2 Rp 239,830.00 Rp 3,333,637.00
8 Pengecatan dinding baru 710.79 m2 Rp 38,820.00 Rp 27,592,906.62
III PEKERJAAN ARSITEKTURAL - LANTAI Rp 63,180,963.44
1 Pas.Keramik 60x60 Polish 285.63 m2 Rp 219,150.00 Rp 62,595,157.05
2 Pas. Keramik 30x30 Unpolish 3.26 m2 Rp 179,530.00 Rp 585,806.39
IV PEKERJAAN SRUKTURAL Rp 177,403,206.19
1 Pond. Pile Cap PC1 100X100X30
-Pekerjaan Beton 5.60 m3 Rp 899,470.00 Rp 5,037,032.00
-Pekerjaan Pembesian Besi Ulir 453.15 kg Rp 14,940.00 Rp 6,770,068.71
-Pekerjaan Bekisting 22.40 m2 Rp 98,020.00 Rp 2,195,648.00
-Pekerjaan Bongkar Bekisting 22.40 m2 Rp 4,210.00 Rp 94,304.00
2 Sloof SL1 20/30
-Pekerjaan Beton 5.60 m3 Rp 899,470.00 Rp 5,032,534.65
-Pekerjaan Pembesian Besi Ulir 608.20 kg Rp 14,940.00 Rp 9,086,435.68
-Pekerjaan Pembesian Besi Polos 218.92 kg Rp 13,090.00 Rp 2,865,619.39
-Pekerjaan Bekisting 55.95 m2 Rp 241,510.00 Rp 13,512,484.50
-Pekerjaan Bongkar Bekisting 55.95 m2 Rp 4,210.00 Rp 235,549.50
3 Kolom KPD 1 30/50
-Pekerjaan Beton 1.05 m3 Rp 899,470.00 Rp 944,443.50
-Pekerjaan Pembesian Besi Ulir 58.35 kg Rp 14,940.00 Rp 871,682.67
-Pekerjaan Pembesian Besi Polos 28.03 kg Rp 13,090.00 Rp 366,958.36
-Pekerjaan Bekisting 11.20 m2 Rp 158,310.00 Rp 1,773,072.00
-Pekerjaan Bongkar Bekisting 11.20 m2 Rp 4,210.00 Rp 47,152.00
4 Kolom K2 15/15
-Pekerjaan Beton 0.36 m3 Rp 899,470.00 Rp 323,809.20
-Pekerjaan Pembesian Besi Ulir 69.57 kg Rp 14,940.00 Rp 1,039,377.81
-Pekerjaan Pembesian Besi Polos 19.89 kg Rp 13,090.00 Rp 260,305.44
-Pekerjaan Bekisting 9.60 m2 Rp 158,310.00 Rp 1,519,776.00
-Pekerjaan Bongkar Bekisting 9.60 m2 Rp 4,210.00 Rp 40,416.00
5 Tangga Beton
-Pekerjaan Beton 1.44 m3 Rp 899,470.00 Rp 1,292,538.39
-Pekerjaan Pembesian Besi Ulir 173.37 kg Rp 14,940.00 Rp 2,590,142.78
-Pekerjaan Pembesian Besi Polos 75.62 kg Rp 13,880.00 Rp 1,049,661.12
-Pekerjaan Bekisting 5.60 m2 Rp 105,690.00 Rp 591,864.00
-Pekerjaan Bongkar Bekisting 5.60 m2 Rp 4,210.00 Rp 23,576.00
6 Kolom K1 WF 300X150X6,5X9 2,552.00 kg Rp 33,580.00 Rp 85,696,160.00
7 Balok B1 WF 200X100X5,5X8 407.47 kg Rp 30,770.00 Rp 12,537,749.33
8 Kanopi Spandek
CNP 125 X 50 X 20 X 2,3 140.92 kg Rp 32,280.00 Rp 4,548,897.60
Hollow Besi 50 x 50 x 2.8mm 68.86 kg Rp 33,200.00 Rp 2,286,052.40
-Spandek 31.12 m2 Rp 220,620.00 Rp 6,864,811.92
9 Pekerjaan Perakitan Struktur Baja 2,959.47 kg Rp 2,340.00 Rp 6,925,152.00
10 Pekerjaan Pengecatan Struktur Baja 32.74 m2 Rp 29,930.00 Rp 979,931.25
VI PEKERJAAN ARSITEKTURAL PINTU DAN JENDELA Rp 26,661,034.02
1 Pintu 1 (P1) 1.00 unit Rp 21,142,208.00 Rp 21,142,208.00
2 Pintu 2 (P2) 1.00 unit Rp 3,056,556.02 Rp 3,056,556.02
3 Pintu 3 (P3) 1.00 unit Rp 982,970.00 Rp 982,970.00
PEKERJAAN PENGGANTUNG/KUNCI/KACA
1 Handle 3.00 set Rp 146,020.00 Rp 438,060.00
2 Kunci Tanam 2.00 bh Rp 117,000.00 Rp 234,000.00
3 engsel pintu 4" (1 stell 4 buah engsel) 3.00 set Rp 190,320.00 Rp 570,960.00
4 grendel pintu dan jendela 3.00 bh Rp 78,760.00 Rp 236,280.00
NO URAIAN PEKERJAAN TOTAL VOLUME SATUAN HARGA SATUAN HARGA

VII PEKERJAAN PLUMBING Rp 14,255,108.06


1 Pasang saluran air bersih pipa PVC tipe AW 3/4" 11.00 m1 Rp 23,240.00 Rp 255,640.00
2 Pasang saluran air kotor pipa PVC tipe AW 3" 10.00 m1 Rp 101,160.00 Rp 1,011,600.00
3 Pasang saluran WC pipa PVC tipe AW 4" 10.00 m1 Rp 151,800.00 Rp 1,518,000.00
4 Pasang Kran Air dinding standart 2.00 bh Rp 397,550.00 Rp 795,100.00
5 Pembuatan bak kontrol baru 1.00 bh Rp 730,680.00 Rp 730,680.00
6 Pompa Listrik Biasa 1.00 unit Rp 749,740.00 Rp 749,740.00
7 Septictank
-Galian Tanah 5.20 m3 Rp 17,700.00 Rp 92,040.00
-Urugan Pasir 0.13 m3 Rp 235,480.00 Rp 30,612.40
-Pek. Beton Septictank 3.71 m3 Rp 899,470.00 Rp 3,334,333.49
-Pekerjaan Pembesian Besi Polos 224.97 kg Rp 13,090.00 Rp 2,944,922.17
-Pekerjaan Bekisting 13.20 m2 Rp 165,990.00 Rp 2,191,068.00
-Pekerjaan Bongkar Bekisting 13.20 m2 Rp 4,210.00 Rp 55,572.00
8 Resapan 2.00 m1 Rp 272,900.00 Rp 545,800.00
VIII PEKERJAAN ELEKTRIKAL Rp 14,662,680.00
1 Pasang instalasi titik lampu NYM 2x1.5 mm2 15.00 bh Rp 706,760.00 Rp 10,601,400.00
2 Pasang instalasi titik stop kontak NYM 2X2,5 mm 5.00 titik Rp 403,730.00 Rp 2,018,650.00
3 Saklar tunggal 2.00 buah Rp 24,210.00 Rp 48,420.00
4 Saklar Ganda 2.00 buah Rp 28,490.00 Rp 56,980.00
5 Stop Kontak 5.00 buah Rp 22,440.00 Rp 112,200.00
6 Panel box Box sekring + MCB 1.00 buah Rp 107,180.00 Rp 107,180.00
7 Pemasangan Lampu Down Light LED 12W Outbow 14.00 bh Rp 115,630.00 Rp 1,618,820.00
8 Pemasangan Lampu Down Light LED 7.5W Inbow 1.00 bh Rp 99,030.00 Rp 99,030.00
IX PEKERJAAN SANITAIR Rp 1,275,290.00
1 Pemasangan closet jongkok 1.00 bh Rp 1,009,760.00 Rp 1,009,760.00
2 Pemasangan Floor Drain 1.00 bh Rp 146,730.00 Rp 146,730.00
3 Soap Holder ( Sabun ) 1.00 bh Rp 53,800.00 Rp 53,800.00
4 Gantungan Handuk KMWC 1.00 bh Rp 65,000.00 Rp 65,000.00
X PEKERJAAN LAIN LAIN Rp 1,262,352.00
1 Railling Tangga Lantai 1
-Hollow 5.60 m1 Rp 225,420.00 Rp 1,262,352.00
JUMLAH HARGA Rp 520,960,564.37
PPN 0.00 % Rp 0.00
TOTAL HARGA Rp 520,960,564.37
NO URAIAN PEKERJAAN TOTAL VOLUME SATUAN HARGA SATUAN HARGA

C LANTAI 2
I PEKERJAAN ARSITEKTURAL - DINDING Rp 46,857,047.68
1 Pasangan bata merah 1Pc : 5Ps 69.74 m2 Rp 98,170.00 Rp 6,846,768.48
2 Plesteran Halus 1 PC : 5 Ps 139.49 m2 Rp 72,120.00 Rp 10,059,874.56
3 Dinding Gewel Spandek 27.19 m2 Rp 220,620.00 Rp 5,998,216.56
4 Pekerjaan Acian 139.49 m2 Rp 36,430.00 Rp 5,081,547.84
5 Pekerjaan Benangan 24.00 m1 Rp 17,280.00 Rp 414,720.00
6 Pas. Keramik Dinding KM/WC 25x40 Polish 54.38 m2 Rp 239,830.00 Rp 13,040,996.08
7 Pengecatan dinding baru 139.49 m2 Rp 38,820.00 Rp 5,414,924.16
II PEKERJAAN ARSITEKTURAL - LANTAI Rp 10,150,370.55
1 Pas.Keramik 60x60 Polish 46.32 m2 Rp 219,150.00 Rp 10,150,370.55
III PEKERJAAN SRUKTURAL Rp 64,086,240.27
1 Plat Lantai T = 12 cm
-Pekerjaan Beton 4.97 m3 Rp 899,470.00 Rp 4,473,963.78
-Pekerjaan Pembesian Besi Polos 533.03 kg Rp 13,090.00 Rp 6,977,313.68
-Pekerjaan Bekisting 41.45 m2 Rp 105,690.00 Rp 4,380,850.50
-Pekerjaan Bongkar Bekisting 41.45 m2 Rp 4,210.00 Rp 174,504.50
2 Kolom K1 WF 300X150X6,5X9 398.93 kg Rp 33,580.00 Rp 13,396,181.33
3 Balok B1 WF 200X100X3,2X4,5 828.57 kg Rp 30,770.00 Rp 25,494,970.69
4 Kanopi Spandek
CNP 125 X 50 X 20 X 2,3 95.75 kg Rp 32,280.00 Rp 3,090,917.60
Hollow Besi 50 x 50 x 2.8mm 26.94 kg Rp 33,200.00 Rp 894,275.20
-Spandek 7.56 m2 Rp 220,620.00 Rp 1,668,549.06
5 Pekerjaan Perakitan Struktur Baja 1,227.50 kg Rp 2,340.00 Rp 2,872,348.05
6 Pekerjaan Pengecatan Struktur Baja 22.13 m2 Rp 29,930.00 Rp 662,365.87
IV PEKERJAAN ARSITEKTURAL - PLAFOND DAN ATAP Rp 245,631,045.77
1 Kuda-Kuda WF 300X150X6,5X9 2,700.13 kg Rp 33,580.00 Rp 90,670,477.33
2 Gording CNP 125 X 50 X 20 X 2,3 1,422.75 kg Rp 32,280.00 Rp 45,926,370.00
3 Sagrot/Penggantung Gording Ø8 62.14 kg Rp 13,090.00 Rp 813,454.49
4 Ikatan Angin Ø12 303.46 kg Rp 14,530.00 Rp 4,409,262.09
5 Pekerjaan Perakitan Kontruksi Besi/Baja 4,488.49 kg Rp 2,340.00 Rp 10,503,056.60
6 Pekerjaan Finishing Pengecatan Rangka Besi/Baja 355.95 m2 Rp 29,930.00 Rp 10,653,583.50
7 Penutup Atap Spandek 374.65 m2 Rp 220,620.00 Rp 82,654,841.76
V PEKERJAAN ARSITEKTURAL PINTU DAN JENDELA Rp 4,933,480.39
1 Jendela 1 (J1) 1.00 unit Rp 1,876,121.80 Rp 1,876,121.80
2 Jendela 2 (J2) 1.00 unit Rp 2,614,358.59 Rp 2,614,358.59
PEKERJAAN PENGGANTUNG/KUNCI/KACA
1 engsel jendela kuningan 4" (1 stel 3 buah engsel) 2.00 set Rp 142,740.00 Rp 285,480.00
2 grendel pintu dan jendela 2.00 bh Rp 78,760.00 Rp 157,520.00
VI PEKERJAAN ELEKTRIKAL Rp 4,596,560.00
1 Pasang instalasi titik lampu NYM 2x1.5 mm2 4.00 bh Rp 706,760.00 Rp 2,827,040.00
2 Pasang instalasi titik stop kontak NYM 2X2,5 mm 3.00 titik Rp 403,730.00 Rp 1,211,190.00
3 Saklar Ganda 1.00 buah Rp 28,490.00 Rp 28,490.00
4 Stop Kontak 3.00 buah Rp 22,440.00 Rp 67,320.00
VII PEKERJAAN LAIN LAIN Rp 20,755,750.68
1 Teralis 43.91 m2 Rp 472,710.00 Rp 20,755,750.68
PPN 0.00 % Rp 0.00
TOTAL HARGA Rp 397,010,495.34