PEMERINTAH KABUPATEN LOMBOK UTARA

DINAS PENDIDIKAN,KEPEMUDAAN DAN OLAHRAGA


Jalan Raya Pemtagon - Bayan Kode Post 83353

RENCANA ANGGARAN BIAYA


(RAB)

PROGRAM :
: PROGRAM MANAJEMEN PELAYANAN PENDIDIKAN

KEGIATAN :
: PELAKSANAAN KERJASAMA SECARA KELEMBAGAAN DIBIDANG PENDIDIKAN

PEKERJAAN :
: Pembangunan Asrama Tahap 2 Darul Mukminin Salut Barat

LOKASI:
: Darul Mukminin Salut Barat, KLU

TAHUN ANGGARAN :
: 2018
REKAPITULASI BIAYA

PROGRAM : PROGRAM MANAJEMEN PELAYANAN PENDIDIKAN


KEGIATAN : PELAKSANAAN KERJASAMA SECARA KELEMBAGAAN DIBIDANG PENDIDIKAN
PEKERJAAN : Pembangunan Asrama Tahap 2 Darul Mukminin Salut Barat
LOKASI : Darul Mukminin Salut Barat, KLU
T.A. : 2018

PEMBANGUNAN RUANG KELAS


NO URAIAN PEKERJAAN TOTAL
I PEKERJAAN PENDAHULUAN Rp 500,000.00
II PEKERJAAN TANAH Rp 3,615,914.06
III PEKERJAAN PONDASI Rp 9,811,010.48
IV PEKERJAAN BETON Rp 21,563,586.98
V PEKERJAAN DINDING DAN PLESTERAN Rp 28,863,493.38
VI PEKERJAAN PENUTUP LANTAI Rp 11,319,499.50
VII PEKERJAAN ATAP DAN PLAFOND Rp 31,753,219.12
VIII PEKERJAAN PINTU DAN JENDELA Rp 9,149,841.80
IX PEKERJAAN PENGUNCI Rp 1,053,645.00
X PEKERJAAN INSTALASI LISTRIK Rp 1,818,380.00
XI PEKERJAAN PENGECATAN Rp 7,851,757.25

JUMLAH Rp 127,300,347.57
PPN 10% Rp 12,730,034.76
JUMLAH TOTAL Rp 140,030,382.33
JUMLAH DI BULATKAN Rp 140,000,000.00
Terbilang : Seratus Empat Puluh Juta Rupiah
RENCANA ANGGARAN BIAYA

PROGRAM : PROGRAM MANAJEMEN PELAYANAN PENDIDIKAN


KEGIATAN : PELAKSANAAN KERJASAMA SECARA KELEMBAGAAN DIBIDANG PENDIDIKAN
PEKERJAAN : Pembangunan Asrama Tahap 2 Darul Mukminin Salut Barat
LOKASI : Darul Mukminin Salut Barat, KLU
T.A. : 2018

KODE
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH HARGA
ANALISA
I PEKERJAAN PENDAHULUAN Rp 500,000.00
1 Pembersihan lokasi 1.00 Unit Ls Rp 200,000.00 Rp 200,000.00
2 Pegukuran dan Pemasangan Bowplank 1.00 Unit Ls Rp 300,000.00 Rp 300,000.00
SUB TOTAL Rp 500,000.00

II PEKERJAAN TANAH Rp 3,615,914.06


1 Galian tanah biasa 15.48 m3 A.2.3.1.1 Rp 59,000.00 Rp 913,320.00
2 Urugan Kembali galian tanah 5.16 m3 A.2.3.1.9 Rp 43,000.00 Rp 221,880.00
3 Pengurugan dengan pasir urug 3.00 m3 A.2.3.1.11 Rp 225,770.00 Rp 677,310.00
4 Pengurugan dengan tanah urug 11.22 m3 A.2.3.1.11.a Rp 160,731.20 Rp 1,803,404.06
SUB TOTAL Rp 3,615,914.06

III PEKERJAAN PONDASI Rp 9,811,010.48


1 Pasangan batu kosong (aanstamping) 3.87 m3 A.3.2.1.9 Rp 449,461.20 Rp 1,739,414.84
2 Pasangan pondasi batu belah 1PC:5PP 10.32 m3 A.3.2.1.3 Rp 782,131.36 Rp 8,071,595.64
SUB TOTAL Rp 9,811,010.48

IV PEKERJAAN BETON Rp 21,563,586.98


1 Sloof Beton Bertulang 15/20 (K.175) 0.97 m3 A.4.1.1.29a Rp 5,412,781.64 Rp 5,236,866.24
2 Kolom Beton Bertulang 15/15 (K.175) 0.89 m3 A.4.1.1.30b Rp 7,660,828.03 Rp 6,846,941.66
3 Ring balok beton bertulang (13 x 15)cm 0.77 m3 A.4.1.1.31b Rp 7,665,495.45 Rp 5,933,093.48
4 Balok gevel beton bertulang (13 x 15)cm 0.19 m3 A.4.1.1.31b Rp 7,665,495.45 Rp 1,434,980.75
5 Balok latei beton bertulang (13 x 15)cm 0.25 m3 A.4.1.1.31b Rp 7,665,495.45 Rp 1,931,704.85
6 Loster beton 12.00 bh Ls Rp 15,000.00 Rp 180,000.00
SUB TOTAL Rp 21,563,586.98

V PEKERJAAN DINDING DAN PLESTERAN Rp 28,863,493.38


1 Pasangan dinding 1/2 bata (camp.1PC : 6PP) 105.50 m2 A.4.4.1.11 Rp 102,162.44 Rp 10,778,136.89
2 Plesteran 1PC : 5PP 211.00 m2 A.4.4.2.5 Rp 53,392.59 Rp 11,265,836.49
3 Acian 211.00 m2 A.4.4.2.27 Rp 32,320.00 Rp 6,819,520.00
SUB TOTAL Rp 28,863,493.38

VI PEKERJAAN PENUTUP LANTAI Rp 11,319,499.50


1 Pasangan lantai keramik (ukuran 40x40cm) 60.00 m2 A.4.4.3.34 Rp 188,658.33 Rp 11,319,499.50
SUB TOTAL Rp 11,319,499.50
VII PEKERJAAN ATAP DAN PLAFOND Rp 31,753,219.12
1 Rangka atap baja ringan 88.34 m2 Ls Rp 140,000.00 Rp 12,367,205.54
2 Atap genteng metal 88.34 m2 A.4.5.2.32. Rp 107,660.00 Rp 9,510,381.06
3 Bubungan genteng metal 13.00 m' A.4.5.2.36. Rp 86,467.50 Rp 1,124,077.50
4 Rangka plafond hollow puring 76.50 m2 Ls Rp 40,000.00 Rp 3,060,000.00
5 Plafond kalsiboard 76.50 m2 A.4.5.1.7.a Rp 58,386.34 Rp 4,466,555.01
6 Kalsiplank 35.00 m' Ls Rp 35,000.00 Rp 1,225,000.00
SUB TOTAL Rp 31,753,219.12

VIII PEKERJAAN PINTU DAN JENDELA Rp 9,149,841.80


1 Kusen alumunium 52.20 m' Ls Rp 90,000.00 Rp 4,698,000.00
2 Daun pintu panil (kayu kelas II) 2.80 m2 A.4.6.1.5. Rp 740,223.50 Rp 2,072,625.80
3 Daun jendela kaca alumunium 4.80 m2 Ls Rp 425,000.00 Rp 2,040,000.00
4 Kaca tebal 3mm 2.40 m2 A.4.6.2.16. Rp 141,340.00 Rp 339,216.00
SUB TOTAL Rp 9,149,841.80

IX PEKERJAAN PENGUNCI Rp 1,053,645.00


1 Kunci pintu 1.00 bh A.4.6.2.2. Rp 217,996.00 Rp 217,996.00
2 Engsel pintu 2.00 bh A.4.6.2.5. Rp 28,663.00 Rp 57,326.00
3 Grendel pintu 1.00 bh A.4.6.2.5.a Rp 32,163.00 Rp 32,163.00
4 Engsel jendela 16.00 bh A.4.6.2.6. Rp 22,705.00 Rp 363,280.00
5 Grendel jendela 8.00 bh A.4.6.2.6.a Rp 22,905.00 Rp 183,240.00
6 Kait angin 8.00 bh A.4.6.2.9. Rp 24,955.00 Rp 199,640.00
SUB TOTAL Rp 1,053,645.00

X PEKERJAAN INSTALASI LISTRIK Rp 1,818,380.00


1 Lampu TL Tornado 24 watt 5.00 BH Ls Rp 66,000.00 Rp 330,000.00
2 Titik Lampu 5.00 TTK Ls Rp 158,360.00 Rp 791,800.00
3 Stop Kontak Tanam 2.00 BH Ls Rp 144,450.00 Rp 288,900.00
4 Saklar tunggal 3.00 BH Ls Rp 29,960.00 Rp 89,880.00
5 Zekering box 1 group 1.00 BH Ls Rp 317,800.00 Rp 317,800.00
SUB TOTAL Rp 1,818,380.00

XI PEKERJAAN PENGECATAN Rp 7,851,757.25


1 Pengecatan tembok 211.00 m2 A.4.7.1.9. Rp 27,310.46 Rp 5,762,507.06
2 Pengecatan plafond 76.50 m2 A.4.7.1.9. Rp 27,310.46 Rp 2,089,250.19
SUB TOTAL Rp 7,851,757.25
VOLUME PEKERJAAN

KEGIATAN : PELAKSANAAN KERJASAMA SECARA KELEMBAGAAN DIBIDANG PENDIDIKAN


PEKERJAAN : Pembangunan Asrama Tahap 2 Darul Mukminin Salut Barat
LOKASI : Darul Mukminin Salut Barat, KLU
T.A. : 2018

DIMENSI
NO. URAIAN PEKERJAAN VOL. SAT
P L T JML.
I. PEKERJAAN PENDAHULUAN
1 Pembersihan lokasi 1.00
2 Pegukuran dan Pemasangan Bowplank 1.00

II. PEKERJAAN TANAH


1 Galian tanah biasa 15.48
43.00 0.60 0.60 1.00 15.48

2 Urugan Kembali galian tanah 1/3xvol. Galian 5.16

3 Pengurugan dengan pasir urug 3.00


induk 9.00 6.00 0.05 1.00 2.70
teras 3.00 2.00 0.05 1.00 0.30

4 Pengurugan dengan tanah urug 11.22


induk 9.00 6.00 0.19 1.00 10.10
teras 3.00 2.00 0.19 1.00 1.12

III. PEKERJAAN PONDASI


1 Pasangan batu kosong (aanstamping) 3.87
43.00 0.60 0.15 1.00 3.87

2 Pasangan pondasi batu belah 1PC:5PP 10.32


43.00 0.40 0.60 1.00 10.32
V. PEKERJAAN BETON
2 Sloof Beton Bertulang 15/20 (K.175) 0.97
43.00 0.15 0.15 1.00 0.97

4 Kolom Beton Bertulang 15/15 (K.175) 0.89


3.80 0.14 0.14 12.00 0.89

6 Ring balok beton bertulang (13 x 15)cm 0.77


43.00 0.12 0.15 1.00 0.77

6 Balok gevel beton bertulang (13 x 15)cm 0.19


10.40 0.12 0.15 1.00 0.19

7 Balok latei beton bertulang (13 x 15)cm 0.25


7.00 0.12 0.15 2.00 0.25

V. PEKERJAAN DINDING DAN PLESTERAN


3 Pasangan dinding 1/2 bata (camp.1PC : 6PP) volume setelah di kurangi lubang pintu jendela 105.50
pas. Bata induk 30.00 3.70 111.00
pas. Bata gunungan 6.00 1.50 0.50 1.00 4.50

1 Plesteran 1PC : 5PP 211.00


1 Acian 211.00

IV. PEKERJAAN PENUTUP LANTAI


2 Pasangan lantai keramik (ukuran 40x40cm) volume setelah di kurangi kermik wc/km 60.00
induk 9.00 6.00 1.00 54.00
teras 3.00 2.00 1.00 6.00
VII PEKERJAAN ATAP DAN PLAFOND
1 Rangka atap baja ringan 88.34
76.50 COS 30.00 88.34

2 Atap genteng metal 88.34


3 Bubungan genteng metal 13.00
4 Rangka plafond hollow puring 76.50
5 Plafond kalsiboard 76.50
6 Kalsiplank 35.00

VI. PEKERJAAN PINTU DAN JENDELA


1 Kusen alumunium 52.20
PJ1 8.70 1.00 8.70
J1 8.70 5.00 43.50

2 Daun pintu panil (kayu kelas II) 2.80


PJ1 2.00 0.70 2.00 2.80

3 Daun jendela kaca alumunium 4.80


J1 0.60 1.00 8.00 4.80

4 Kaca tebal 3mm 2.40


J1 0.50 0.60 8.00 2.40

VIIIPEKERJAAN PENGUNCI
1 Kunci pintu 1.00
2 Engsel pintu 2.00
3 Grendel pintu 1.00
4 Engsel jendela 16.00
5 Grendel jendela 8.00
6 Kait angin 8.00
6 loster beton 12.00

IX. PEKERJAAN INSTALASI LISTRIK


2 Lampu TL Tornado 24 watt 5.00
4 Titik Lampu 5.00
5 Stop Kontak Tanam 2.00
6 Saklar tunggal 3.00
7 Zekering box 1 group 1.00

X. PEKERJAAN PENGECATAN
1 Pengecatan tembok 211.00
2 Pengecatan plafond 76.50
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KABUPATEN LOMBOK UTARA
TAHUN ANGGARAN 2018

A. DAFTAR HARGA SATUAN UPAH


NO. URAIAN KODE SATUAN HARGA SATUAN KETERANGAN
1 Pekerja L.01 OH Rp. 75,000.00
2 Tukang Batu L.02 OH Rp. 100,000.00
3 Kepala Tukang Batu L.03 OH Rp. 110,000.00
4 Tukang Kayu L.02 OH Rp. 100,000.00
5 Kepala Tukang Kayu L.03 OH Rp. 110,000.00
6 Tukang Besi L.02 OH Rp. 100,000.00
7 Kepala Tukang Besi L.03 OH Rp. 110,000.00
8 Tukang Las L.02 OH Rp. 100,000.00
9 Kepala Tukang Las L.03 OH Rp. 110,000.00
10 Tukang Cat L.02 OH Rp. 100,000.00
11 Kepala Tukang Cat L.03 OH Rp. 110,000.00
12 Tukang Listrik L.02 OH Rp. 85,000.00
13 Kepala Tukang Listrik L.03 OH Rp. 95,000.00
14 Mandor L.04 OH Rp. 110,000.00
B. DAFTAR HARGA SATUAN BAHAN
NO. URAIAN SATUAN HARGA SATUAN KETERANGAN
1.1 BAHAN PASANGAN DAN TANAH
1 Batu kali M3 Rp. 225,500.00
2 Batu pecah 5-7 cm M3 Rp. 242,500.00
3 Batu pecah 3-5 cm M3 Rp. 361,000.00
4 Batu pecah 2-3 cm M3 Rp. 389,500.00
5 Kerikil Pecah 2/3 cm M3 Rp. 333,800.00
6 Kerikil Pecah 1/2 cm M3 Rp. 343,149.00
7 Bata merah kelas 1 buah Rp. 750.00
8 Bata merah kelas 2 buah Rp. 650.00
9 Pasir Beton (PB) M3 Rp. 196,452.00
10 Pasir Pasang (PP) M3 Rp. 165,315.00
11 Pasir Urug M3 Rp. 168,475.00
12 Tanah urug M3 Rp. 114,276.00
13 Tanah Urug Pilihan M3 Rp. 182,850.00
14 Semen Warna kg Rp. 18,404.00
15 Portland Cemen/PC kg Rp. 1,600.00
16 Batu tempel hitam M2 Rp. 163,710.00

1.2 BAHAN CETAK


1 Batako 10 x 20 x 40 Cm buah Rp. 3,210.00
2 Paving blok biasa type bata t=8 cm buah Rp. 2,000.00
3 Paving blok press type bata t=8 cm buah Rp. 3,450.00
4 Paving blok press type berlian t=8 cm buah Rp. 3,450.00

1.2 BAHAN KAYU


1 Papan Kayu Klas I M3 Rp. 12,858,700.00
2 Balok Kayu Klas I M3 Rp. 12,858,700.00
3 Papan Kayu Klas II M3 Rp. 7,444,500.00
4 Balok Kayu Klas II M3 Rp. 7,444,500.00
5 Papan Kayu Klas III M3 Rp. 5,550,700.00
6 Balok Kayu Klas III M3 Rp. 5,550,700.00
7 Lumbersering kls I M3 Rp. 2,870,700.00
8 Lumbersering kls II M3 Rp. 2,701,750.00
9 Dolken / Perancah Dia.10 Cm - 4 M batang Rp. 28,000.00
10 Papan kayu bekisting M3 Rp. 3,384,000.00
11 Balok kayu bekisting M3 Rp. 3,385,000.00
1.3 BAHAN LANTAI
1 Keramik Kualitas I (Motif) M2 Rp. 111,708.00
2 Keramik Kualitas II (Motif) M2 Rp. 94,374.00
3 Keramik Kualitas I (polos) M2 Rp. 76,184.00
4 Keramik Kualitas II (polos) M2 Rp. 69,443.00
5 Keramik Cutting 30 x 50 M2 Rp. 39,911.00
6 Marmer kualitas I M2 Rp. 451,968.00
7 Marmer kualitas II M2 Rp. 384,665.00
8 Batu tempel palimanan M2 Rp. 227,910.00

1.4 BAHAN BESI DAN ALUMUNIUM


1 Besi Beton Ulir kg Rp. 21,186.00
2 Besi Beton Polos kg Rp. 20,700.00
3 Kawat Beton kg Rp. 27,713.00
4 Besi Strip kg Rp. 21,900.00

1.5 BAHAN LANGIT-LANGIT


1 Triplek 120x240x3 mm lembar Rp. 92,876.00
2 Triplek 120x240x6 mm lembar Rp. 160,179.00
3 Triplek 120x240x9 mm lembar Rp. 209,934.00
4 Kalsiboard 120x240x3.5 mm lembar Rp. 115,560.00
5 Gysumboard 120x240x9mm M' Rp. 24,289.00
6 List Gypsum M' Rp. 42,158.00
7 Lem Kayu kg Rp. 57,887.00
8 Playwood 120x240x3 mm lembar Rp. 101,436.00

1.6 BAHAN ATAP


1 Bubungan Genteng Lokal M' Rp. 4,500.00
2 Bubungan Genteng Metal M2 Rp. 44,000.00
3 Genteng Kaca buah Rp. 18,618.00
4 Genteng Keramik buah Rp. 16,157.00
5 Genteng Metal Biasa m2 Rp. 75,000.00
6 Genteng Lokal buah Rp. 2,354.00
7 Seng Plat BJLS 18 lembar Rp. 46,438.00
8 Seng Plat BJLS 20 lembar Rp. 82,818.00
9 Seng Plat BJLS 25 lembar Rp. 115,025.00
10 Seng Plat BJLS 30 lembar Rp. 136,639.00
1.7 BAHAN PIPA
1 Pipa GI Ø ½" & Accessories M' Rp. 165,208.00
2 Pipa GI Ø 1" & Accessories M' Rp. 59,599.00
3 Pipa GI Ø 2" & Accessories M' Rp. 150,228.00
4 Pipa GI Ø 3" & Accessories M' Rp. 253,055.00
5 Pipa PVC Ø ½" & Accessories M' Rp. 7,276.00
6 Pipa PVC Ø ¾" & Accessories M' Rp. 9,737.00
7 Pipa PVC Ø 1" & Accessories M' Rp. 45,475.00
8 Pipa PVC Ø 2" & Accessories M' Rp. 57,994.00
9 Pipa PVC Ø 3" & Accessories M' Rp. 126,581.00
10 Lem PVC kg Rp. 163,068.00

1.8 BAHAN KACA


1 Kaca Polos 3 mm m² Rp. 110,500.00
2 Kaca Polos 5 mm m² Rp. 163,603.00
3 Kaca Riben Tebal 3 mm m² Rp. 148,837.00
4 Kaca Riben Tebal 5 mm m² Rp. 211,646.00
5 Sealant kg Rp. 22,700.00

1.9 BAHAN FINISHING


1 Ampelas lembar Rp. 6,741.00
2 Plamir Kayu kg Rp. 47,294.00
3 Minyak Cat liter Rp. 47,294.00
4 Teak Oil liter Rp. 54,142.00
5 Melamin lembar Rp. 120,589.00
6 Meni Kayu kg Rp. 36,915.00
7 Cat Kayu Mutu Menengah kg Rp. 78,752.00
8 Cat Kayu Mutu Tinggi kg Rp. 107,000.00
9 Cat Tembok Mutu Menengah Kg Rp. 47,936.00
10 Cat Tembok Mutu Tinggi kg/ kaleng Rp. 121,766.00
11 Cat Besi kg Rp. 135,228.00
12 Kuas cat bh Rp. 11,150.00
13 Plamir Tembok kg Rp. 12,305.00
14 Minyak Begisting liter Rp. 20,865.00
15 Aqua Proff kg Rp. 76,291.00

2.0 BAHAN KUNCI


1 Kunci Pintu Mutu Menengah buah Rp. 161,196.00
2 Kunci Pintu Mutu Tinggi buah Rp. 473,743.00
3 Haag Angin Besar stel Rp. 7,850.00
4 Haag Angin Kecil stel Rp. 6,300.00
5 Grendel Besar buah Rp. 14,300.00
6 Grendel Kecil buah Rp. 11,000.00
7 Engsel biasa ps Rp. 10,800.00
2.1 BAHAN SANITAIRE
1 Closet Duduk (kwalitas no. 1) buah Rp. 5,537,250.00
2 Closet Jongkok Porselin buah Rp. 236,256.00
3 Saringan Air Besi Stainless buah Rp. 281,410.00
4 Saringan Air Besi buah Rp. 8,434,810.00
5 Saringan Air Plastik buah Rp. 225,770.00
6 Bak Cuci Piring Logam buah Rp. 526,440.00
7 Bak Fyberglass Kap 0.5 M3 buah Rp. 1,141,690.00
8 Kran Dia ½" Buah Rp. 33,800.00
9 Saringan Air Plastik buah Rp. 225,770.00
10 Air ltr Rp. 55.00
11 Sealtape buah Rp. 3,630.00

1.11 BAHAN PAKU


1 Paku 5-12cm kg Rp. 27,820.00
2 Paku Seng kg Rp. 38,520.00
3 Paku Usuk kg Rp. 28,890.00
4 Paku Reng kg Rp. 33,170.00
5 Paku Eternit kg Rp. 43,870.00
6 Paku Asbes kg Rp. 37,450.00
7 Paku sekrup kg Rp. 24,750.00

1.12 BAHAN LISTRIK


1 Titik Lampu buah Rp. 158,360.00
2 Stop Kontak Tanam buah Rp. 144,450.00
3 Stop Kontak Luar buah Rp. 159,430.00
4 Saklar buah Rp. 29,960.00
5 Lampu pijar 25 watt buah Rp. 6,270.00
6 Lampu TL Tornado 24 watt buah Rp. 66,000.00
Lampu TL panjang (Neon Box) 1 x 24
7 buah Rp. 112,046.00
Watt
8 Zekering Box 1 Group buah Rp. 317,800.00
9 Zekering Box 2 Group buah Rp. 411,950.00
10 Zekering Box 3 Group buah Rp. 506,150.00
11 Saklar ganda buah Rp. 29,700.00
R E KAP I TU LAS I
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN LOMBOK UTARA
TAHUN ANGGARAN 2018

NO KODE JENIS PEKERJAAN SATUAN HARGA SATUAN

A.2.3.1. HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 Galian tanah biasa m3 Rp. 59,000.00
2 A.2.3.1.9 Urugan Kembali galian tanah m3 Rp. 43,000.00
3 A.2.3.1.10 Pemadatan tanah m3 Rp. 43,000.00
4 A.2.3.1.11 Pengurugan dengan pasir urug m3 Rp. 225,770.00
5 A.2.3.1.11.a Pengurugan dengan tanah urug m3 Rp. 160,731.20
A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
1 A.3.2.1.3 Pasangan pondasi batu belah 1PC:5PP m3 Rp. 782,131.36
2 A.3.2.1.9 Pasangan batu kosong (aanstamping) m3 Rp. 449,461.20
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
1 A.4.1.1.2 Rabat beton mutu f’c = 9,8 MPa ,K-125. m3 Rp. 983,298.70
2 A.4.1.1.3 Beton mutu f’c = 12,2 MPa ,K-150. m3 Rp. 1,017,265.63
3 A.4.1.1.5 Beton mutu f’c = 14,5 MPa ,K-175. m3 Rp. 1,057,960.15
4 A.4.1.1.6 Beton mutu f’c = 16,9 MPa ,K-200. m3 Rp. 1,095,985.30
5 A.4.1.1.17 Pembesian dengan besi polos kg Rp. 23,496.70
6 A.4.1.1.20 Pasangan Bekisting untuk Pondasi m2 Rp. 233,432.50
7 A.4.1.1.21 Pasangan Bekisting untuk Sloof m2 Rp. 233,432.50
8 A.4.1.1.22 Pasangan Bekisting untuk Kolom m2 Rp. 415,184.10
9 A.4.1.1.23 Pasangan Bekisting untuk Balok m2 Rp. 431,836.20
10 A.4.1.1.24 Pasangan Bekisting untuk Plat m2 Rp. 415,184.10
12 A.4.1.1.29a Sloof Beton Bertulang 15/20 (K.175) m3 Rp. 5,412,781.64
13 A.4.1.1.30a Kolom Beton Bertulang 20/20 (K.175) m3 Rp. 6,298,327.48
14 A.4.1.1.30b Kolom Beton Bertulang 15/15 (K.175) m3 Rp. 7,660,828.03
15 A.4.1.1.31a Balok Beton Bertulang 15/20 (K.175) m3 Rp. 7,206,231.47
16 A.4.1.1.31b Balok Beton Bertulang 13/15 (K.175) m3 Rp. 7,665,495.45
17 A.4.1.1.32a Plat Beton Bertulang tbl. 6cm (K.175) m3 Rp. 6,987,300.54
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
1 A.4.4.1.11 Pasangan dinding 1/2 bata (camp.1PC : 6PP) m2 Rp. 102,162.44
A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN
1 A.4.4.2.5 Plesteran 1PC : 5PP m2 Rp. 53,392.59
2 A.4.4.2.23 Plesteran ciprat 1PC : 2PP m2 Rp. 43,153.89
3 A.4.4.2.26 Plesteran siar pas. Batu belah, camp. 1PC : 2PP m2 Rp. 43,153.89
4 A.4.4.2.27 Acian m2 Rp. 32,320.00
A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 A.4.4.3.34 Pasangan lantai keramik (ukuran 40x40cm) m2 Rp. 188,658.33
2 A.4.4.3.36 Pasangan lantai keramik (ukuran 20x20cm) m2 Rp. 221,353.32
3 A.4.4.3.54 Pasangan keramik dinding m2 Rp. 242,845.13
4 A.4.4.3.58 Pasangan dinding batu tempel hitam m2 Rp. 370,487.03
A.4.5.1. HARGA SATUAN PEKERJAAN PLAFOND
1 A.4.5.1.7.a Plafond kalsiboard m2 Rp. 58,386.34
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
1 A.4.5.2.32. Atap genteng metal m2 Rp. 107,660.00
2 A.4.5.2.36. Bubungan genteng metal m' Rp. 86,467.50
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
1 A.4.6.1.2. Kusen pintu dan jendela (kayu kelas II) m3 Rp. 11,507,062.00
2 A.4.6.1.5. Daun pintu panil (kayu kelas II) m2 Rp. 740,223.50
3 A.4.6.1.6. Daun jendela kaca (kayu kelas II) m2 Rp. 526,834.10
4 A.4.6.1.7. Daun jendela jalusi kayu kelas II m2 Rp. 836,191.50
A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA
1 A.4.6.2.2. Kunci pintu bh Rp. 217,996.00
2 A.4.6.2.5. Engsel pintu bh Rp. 28,663.00
3 A.4.6.2.5.a Grendel pintu bh Rp. 32,163.00
4 A.4.6.2.6. Engsel jendela bh Rp. 22,705.00
5 A.4.6.2.6.a Grendel jendela bh Rp. 22,905.00
6 A.4.6.2.9. Kait angin bh Rp. 24,955.00
7 A.4.6.2.16. Kaca tebal 3mm m2 Rp. 141,340.00
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN
1 A.4.7.1.4. Pengecatan bidang kayu m2 Rp. 56,940.16
2 A.4.7.1.9. Pengecatan tembok m2 Rp. 27,310.46
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI
1 A.5.1.1.2. Klosed jongkok porselin BH Rp. 506,609.15
2 A.5.1.1.10. Bak air fibreglass BH Rp. 1,215,790.00
3 A.5.1.1.14. Floor drain BH Rp. 238,170.00
4 A.5.1.1.19. Kran air besi 1/2" BH Rp. 79,590.75
5 A.5.1.1.25. Pipa PVC type AW, dia. 1/2" m' Rp. 18,311.20
6 A.5.1.1.29. Pipa PVC type AW, dia. 2" m' Rp. 83,962.80
7 A.5.1.1.31. Pipa PVC type AW, dia. 3" m' Rp. 173,397.20
ANALISA HARGA SATUAN PEKERJAAN
KABUPATEN LOMBOK UTARA
TAHUN ANGGARAN 2018

A.2.3.1. HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1 1 m3 Galian tanah biasa 59,000.00


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.750 75,000.00 56,250.00
2 Mandor L.04 OH 0.025 110,000.00 2,750.00
Jumlah Tenaga Kerja 59,000.00
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 59,000.00


E Harga satuan Pekerjaan 59,000.00

A.2.3.1.9 1 m3 Urugan Kembali galian tanah 43,000.00


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.500 75,000.00 37,500.00
2 Mandor L.04 OH 0.050 110,000.00 5,500.00
Jumlah Tenaga Kerja 43,000.00
B Bahan

Jumlah Harga Bahan -


C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 43,000.00


F Jumlah Harga ( D + E ) 43,000.00

A.2.3.1.10 1 m3 Pemadatan tanah 43,000.00


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.500 75,000.00 37,500.00
2 Mandor L.04 OH 0.050 110,000.00 5,500.00
Jumlah Tenaga Kerja 43,000.00
B Bahan

Jumlah Harga Bahan -


C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 43,000.00


E Harga satuan Pekerjaan 43,000.00
A.2.3.1.11 1 m3 Pengurugan dengan pasir urug 225,770.00
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.300 75,000.00 22,500.00
2 Mandor L.04 OH 0.010 110,000.00 1,100.00
Jumlah Tenaga Kerja 23,600.00
B Bahan
1 Pasir Urug M3 1.200 168,475.00 202,170.00
Jumlah Harga Bahan 202,170.00
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 225,770.00


E Harga satuan Pekerjaan 225,770.00

A.2.3.1.11.a 1 m3 Pengurugan dengan tanah urug 160,731.20


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.300 75,000.00 22,500.00
2 Mandor L.04 OH 0.010 110,000.00 1,100.00
Jumlah Tenaga Kerja 23,600.00
B Bahan
1 Tanah urug M3 1.200 114,276.00 137,131.20
Jumlah Harga Bahan 137,131.20
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 160,731.20


E Harga satuan Pekerjaan 160,731.20
A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI

A.3.2.1.3 1 m3 Pasangan pondasi batu belah 1PC:5PP 782,131.36


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 1.500 75,000.00 112,500.00
2 Tukang batu L.02 OH 0.750 100,000.00 75,000.00
3 Kepala Tukang batu L.03 OH 0.075 110,000.00 8,250.00
4 Mandor L.04 OH 0.075 110,000.00 8,250.00
Jumlah Tenaga Kerja 204,000.00
B Bahan
1 Batu kali M3 1.200 225,500.00 270,600.00
2 Portland Cemen/PC kg 136.000 1,600.00 217,600.00
3 Pasir Pasang (PP) M3 0.544 165,315.00 89,931.36
Jumlah Harga Bahan 578,131.36
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 782,131.36


E Harga satuan Pekerjaan 782,131.36

A.3.2.1.9 1 m3 Pasangan batu kosong (aanstamping) 449,461.20


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.780 75,000.00 58,500.00
2 Tukang batu L.02 OH 0.390 100,000.00 39,000.00
3 Kepala Tukang batu L.03 OH 0.039 110,000.00 4,290.00
4 Mandor L.04 OH 0.039 110,000.00 4,290.00
Jumlah Tenaga Kerja 106,080.00
B Bahan
1 Batu kali M3 1.200 225,500.00 270,600.00
2 Pasir Urug M3 0.432 168,475.00 72,781.20
Jumlah Harga Bahan 343,381.20
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 449,461.20


E Harga satuan Pekerjaan 449,461.20
A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A.4.1.1.2 1 m3 Rabat beton mutu f’c = 9,8 MPa ,K-125. 983,298.70


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 1.650 75,000.00 123,750.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang batu L.03 OH 0.028 110,000.00 3,080.00
4 Mandor L.04 OH 0.083 110,000.00 9,130.00
Jumlah Tenaga Kerja 163,460.00
B Bahan
1 Portland Cemen/PC kg 276 1,600.00 441,600.00
2 Pasir Beton (PB) M3 0.591 196,452.00 116,187.33
3 Kerikil Pecah 2/3 cm M3 0.750 333,800.00 250,226.37
4 Air ltr 215.000 55.00 11,825.00
Jumlah Harga Bahan 819,838.70
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 983,298.70


E Harga Satuan Pekerjaan 983,298.70

A.4.1.1.3 1 m3 Beton mutu f’c = 12,2 MPa ,K-150. 1,017,265.63


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 1.650 75,000.00 123,750.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang batu L.03 OH 0.028 110,000.00 3,080.00
4 Mandor L.04 OH 0.083 110,000.00 9,130.00
Jumlah Tenaga Kerja 163,460.00
B Bahan
1 Portland Cemen/PC kg 299.000 1,600.00 478,400.00
2 Pasir Beton (PB) M3 0.571 196,452.00 112,117.96
3 Kerikil Pecah 2/3 cm M3 0.753 333,800.00 251,462.67
4 Air ltr 215.000 55.00 11,825.00
Jumlah Harga Bahan 853,805.63
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 1,017,265.63


E Harga Satuan Pekerjaan 1,017,265.63
A.4.1.1.5 1 m3 Beton mutu f’c = 14,5 MPa ,K-175. 1,057,960.15
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 1.650 75,000.00 123,750.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang batu L.03 OH 0.028 110,000.00 3,080.00
4 Mandor L.04 OH 0.083 110,000.00 9,130.00
Jumlah Tenaga Kerja 163,460.00
B Bahan
1 Portland Cemen/PC kg 326.000 1,600.00 521,600.00
2 Pasir Beton (PB) M3 0.543 196,452.00 106,645.37
3 Kerikil Pecah 2/3 cm M3 0.762 333,800.00 254,429.78
4 Air ltr 215.000 55.00 11,825.00
Jumlah Harga Bahan 894,500.15
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 1,057,960.15


E Harga Satuan Pekerjaan 1,057,960.15

A.4.1.1.6 1 m3 Beton mutu f’c = 16,9 MPa ,K-200. 1,095,985.30


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 1.650 75,000.00 123,750.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang batu L.03 OH 0.028 110,000.00 3,080.00
4 Mandor L.04 OH 0.083 110,000.00 9,130.00
Jumlah Tenaga Kerja 163,460.00
B Bahan
1 Portland Cemen/PC kg 352.000 1,600.00 563,200.00
2 Pasir Beton (PB) M3 0.522 196,452.00 102,576.01
3 Kerikil Pecah 2/3 cm M3 0.764 333,800.00 254,924.30
4 Air ltr 215.000 55.00 11,825.00
Jumlah Harga Bahan 932,525.30
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 1,095,985.30


E Harga Satuan Pekerjaan 1,095,985.30
A.4.1.1.17 1 kg Pembesian dengan besi polos 23,496.70
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.007 75,000.00 525.00
2 Tukang Besi L.02 OH 0.007 100,000.00 700.00
3 Kepala Tukang besi L.03 OH 0.0007 110,000.00 77.00
4 Mandor L.04 OH 0.0004 110,000.00 44.00
Jumlah Tenaga Kerja 1,346.00
B Bahan
1 Besi Beton Polos kg 1.050 20,700.00 21,735.00
2 Kawat Beton kg 0.015 27,713.00 415.70
Jumlah Harga Bahan 22,150.70
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 23,496.70


E Harga Satuan Pekerjaan 23,496.70

A.4.1.1.20 1 m2 Pasangan Bekisting untuk Pondasi 233,432.50


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.520 75,000.00 39,000.00
2 Tukang Kayu L.02 OH 0.260 100,000.00 26,000.00
3 Kepala Tukang kayu L.03 OH 0.0260 110,000.00 2,860.00
4 Mandor L.04 OH 0.0260 110,000.00 2,860.00
Jumlah Tenaga Kerja 70,720.00
B Bahan
1 Papan kayu bekisting M3 0.045 3,384,000.00 152,280.00
2 Paku 5-12cm kg 0.300 27,820.00 8,346.00
3 Minyak Begisting liter 0.100 20,865.00 2,086.50
Jumlah Harga Bahan 162,712.50
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 233,432.50


E Harga Satuan Pekerjaan 233,432.50
A.4.1.1.21 1 m2 Pasangan Bekisting untuk Sloof 233,432.50
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.520 75,000.00 39,000.00
2 Tukang Kayu L.02 OH 0.260 100,000.00 26,000.00
3 Kepala Tukang kayu L.03 OH 0.0260 110,000.00 2,860.00
4 Mandor L.04 OH 0.0260 110,000.00 2,860.00
Jumlah Tenaga Kerja 70,720.00
B Bahan
1 Papan kayu bekisting M3 0.045 3,384,000.00 152,280.00
2 Paku 5-12cm kg 0.300 27,820.00 8,346.00
3 Minyak Begisting liter 0.100 20,865.00 2,086.50
Jumlah Harga Bahan 162,712.50
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 233,432.50


E Harga Satuan Pekerjaan 233,432.50

A.4.1.1.22 1 m2 Pasangan Bekisting untuk Kolom 415,184.10


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.660 75,000.00 49,500.00
2 Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
3 Kepala Tukang kayu L.03 OH 0.0330 110,000.00 3,630.00
4 Mandor L.04 OH 0.0330 110,000.00 3,630.00
Jumlah Tenaga Kerja 89,760.00
B Bahan
1 Papan kayu bekisting M3 0.040 3,384,000.00 135,360.00
2 Paku 5-12cm kg 0.400 27,820.00 11,128.00
3 Minyak Begisting liter 0.200 20,865.00 4,173.00
4 Balok Kayu Klas III M3 0.015 5,550,700.00 83,260.50
5 Playwood 120x240x3 mm lembar 0.350 101,436.00 35,502.60
6 Dolken / Perancah Dia.10 Cm - 4 M batang 2.000 28,000.00 56,000.00
Jumlah Harga Bahan 325,424.10
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 415,184.10


E Harga Satuan Pekerjaan 415,184.10
A.4.1.1.23 1 m2 Pasangan Bekisting untuk Balok 431,836.20
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.660 75,000.00 49,500.00
2 Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
3 Kepala Tukang kayu L.03 OH 0.0330 110,000.00 3,630.00
4 Mandor L.04 OH 0.0330 110,000.00 3,630.00
Jumlah Tenaga Kerja 89,760.00
B Bahan
1 Papan kayu bekisting M3 0.040 3,384,000.00 135,360.00
2 Paku 5-12cm kg 0.400 27,820.00 11,128.00
3 Minyak Begisting liter 0.200 20,865.00 4,173.00
4 Balok Kayu Klas III M3 0.018 5,550,700.00 99,912.60
5 Playwood 120x240x3 mm lembar 0.350 101,436.00 35,502.60
6 Dolken / Perancah Dia.10 Cm - 4 M batang 2.000 28,000.00 56,000.00
Jumlah Harga Bahan 342,076.20
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 431,836.20


E Harga Satuan Pekerjaan 431,836.20
A.4.1.1.24 1 m2 Pasangan Bekisting untuk Plat 415,184.10
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.660 75,000.00 49,500.00
2 Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
3 Kepala Tukang kayu L.03 OH 0.0330 110,000.00 3,630.00
4 Mandor L.04 OH 0.0330 110,000.00 3,630.00
Jumlah Tenaga Kerja 89,760.00
B Bahan
1 Papan kayu bekisting M3 0.040 3,384,000.00 135,360.00
2 Paku 5-12cm kg 0.400 27,820.00 11,128.00
3 Minyak Begisting liter 0.200 20,865.00 4,173.00
4 Balok Kayu Klas III M3 0.015 5,550,700.00 83,260.50
5 Playwood 120x240x3 mm lembar 0.350 101,436.00 35,502.60
6 Dolken / Perancah Dia.10 Cm - 4 M batang 2.000 28,000.00 56,000.00
Jumlah Harga Bahan 325,424.10
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 415,184.10


E Harga Satuan Pekerjaan 415,184.10

A.4.1.1.29a 1 m3 Sloof Beton Bertulang 15/20 (K.175) 5,412,781.64


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Beton mutu f’c = 14,5 MPa ,K-175. m3 0.990 1,057,960.15 1,046,886.83
B Pembesian dengan besi polos kg 97.500 23,496.70 2,290,939.25
C Pasangan Bekisting untuk Sloof m2 8.889 233,432.50 2,074,955.56

D Jumlah (A+B+C) 5,412,781.64


E Harga Satuan Pekerjaan 5,412,781.64

A.4.1.1.30a 1 m3 Kolom Beton Bertulang 20/20 (K.175) 6,298,327.48


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Beton mutu f’c = 14,5 MPa ,K-175. m3 0.992 1,057,960.15 1,049,655.16
B Pembesian dengan besi polos kg 105.580 23,496.70 2,480,778.32
C Pasangan Bekisting untuk Kolom m2 6.667 415,184.10 2,767,894.00

D Jumlah (A+B+C) 6,298,327.48


E Harga Satuan Pekerjaan 6,298,327.48
A.4.1.1.30b 1 m3 Kolom Beton Bertulang 15/15 (K.175) 7,660,828.03
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Beton mutu f’c = 14,5 MPa ,K-175. m3 0.986 1,057,960.15 1,043,195.73
B Pembesian dengan besi polos kg 124.575 23,496.70 2,927,106.97
C Pasangan Bekisting untuk Kolom m2 8.889 415,184.10 3,690,525.33

D Jumlah (A+B+C) 7,660,828.03


E Harga Satuan Pekerjaan 7,660,828.03

A.4.1.1.31a 1 m3 Balok Beton Bertulang 15/20 (K.175) 7,206,231.47


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Beton mutu f’c = 14,5 MPa ,K-175. m3 0.990 1,057,960.15 1,046,886.83
B Pembesian dengan besi polos kg 93.666 23,496.70 2,200,846.13
C Pasangan Bekisting untuk Balok m2 9.167 431,836.20 3,958,498.50

D Jumlah (A+B+C) 7,206,231.47


E Harga Satuan Pekerjaan 7,206,231.47

A.4.1.1.31b 1 m3 Balok Beton Bertulang 13/15 (K.175) 7,665,495.45


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Beton mutu f’c = 14,5 MPa ,K-175. m3 0.984 1,057,960.15 1,040,924.28
B Pembesian dengan besi polos kg 140.563 23,496.70 3,302,754.25
C Pasangan Bekisting untuk Balok m2 7.692 431,836.20 3,321,816.92

D Jumlah (A+B+C) 7,665,495.45


E Harga Satuan Pekerjaan 7,665,495.45

A.4.1.1.32a 1 m3 Plat Beton Bertulang tbl. 6cm (K.175) 6,987,300.54


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Beton mutu f’c = 14,5 MPa ,K-175. m3 1.000 1,057,960.15 1,057,821.73
B Pembesian dengan besi polos kg 136.939 23,496.70 3,217,611.31
C Pasangan Bekisting untuk Plat m2 8.333 325,424.10 2,711,867.50

D Jumlah (A+B+C) 6,987,300.54


E Harga Satuan Pekerjaan 6,987,300.54
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING

A.4.4.1.11 1 m2 Pasangan dinding 1/2 bata (camp.1PC : 6PP) 102,162.44


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.300 75,000.00 22,500.00
2 Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
3 Kepala Tukang Batu L.03 OH 0.010 110,000.00 1,100.00
4 Mandor L.04 OH 0.015 110,000.00 1,650.00
Jumlah Tenaga Kerja 35,250.00
B Bahan
1 Bata merah kelas 2 buah 70.000 650.00 45,500.00
2 Portland Cemen/PC kg 8.320 1,600.00 13,312.00
3 Pasir Pasang (PP) M3 0.049 165,315.00 8,100.44
Jumlah Harga Bahan 66,912.44
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 102,162.44


F Jumlah Harga ( D + E ) 102,162.44
A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.5 1 m2 Plesteran 1PC : 5PP 53,392.59


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.300 75,000.00 22,500.00
2 Tukang Batu L.02 OH 0.150 100,000.00 15,000.00
3 Kepala Tukang Batu L.03 OH 0.015 110,000.00 1,650.00
4 Mandor L.04 OH 0.015 110,000.00 1,650.00
Jumlah Tenaga Kerja 40,800.00
B Bahan
1 Portland Cemen/PC kg 5.184 1,600.00 8,294.40
2 Pasir Pasang (PP) M3 0.026 165,315.00 4,298.19
Jumlah Harga Bahan 12,592.59
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 53,392.59


E Harga satuan Pekerjaan 53,392.59

A.4.4.2.23 1 m2 Plesteran ciprat 1PC : 2PP 43,153.89


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.300 75,000.00 22,500.00
2 Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
3 Kepala Tukang Batu L.03 OH 0.010 110,000.00 1,100.00
4 Mandor L.04 OH 0.015 110,000.00 1,650.00
Jumlah Tenaga Kerja 35,250.00
B Bahan
1 Portland Cemen/PC kg 4.320 1,600.00 6,912.00
2 Pasir Pasang (PP) M3 0.006 165,315.00 991.89
Jumlah Harga Bahan 7,903.89
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 43,153.89


E Harga satuan Pekerjaan 43,153.89
A.4.4.2.26 1 m2 Plesteran siar pas. Batu belah, camp. 1PC : 2PP 43,153.89
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.300 75,000.00 22,500.00
2 Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
3 Kepala Tukang Batu L.03 OH 0.010 110,000.00 1,100.00
4 Mandor L.04 OH 0.015 110,000.00 1,650.00
Jumlah Tenaga Kerja 35,250.00
B Bahan
1 Portland Cemen/PC kg 4.320 1,600.00 6,912.00
2 Pasir Pasang (PP) M3 0.006 165,315.00 991.89
Jumlah Harga Bahan 7,903.89
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 43,153.89


E Harga satuan Pekerjaan 43,153.89

A.4.4.2.27 1 m2 Acian 32,320.00


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.200 75,000.00 15,000.00
2 Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
3 Kepala Tukang Batu L.03 OH 0.010 110,000.00 1,100.00
4 Mandor L.04 OH 0.010 110,000.00 1,100.00
Jumlah Tenaga Kerja 27,200.00
B Bahan
1 Portland Cemen/PC kg 3.200 1,600.00 5,120.00
Jumlah Harga Bahan 5,120.00
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 32,320.00


E Harga satuan Pekerjaan 32,320.00
A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.34 1 m2 Pasangan lantai keramik (ukuran 40x40cm) 188,658.33


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.700 75,000.00 52,500.00
2 Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
3 Kepala Tukang Batu L.03 OH 0.035 110,000.00 3,850.00
4 Mandor L.04 OH 0.035 110,000.00 3,850.00
Jumlah Tenaga Kerja 95,200.00
B Bahan
1 Keramik Kualitas II (polos) M2 1.050 69,443.00 72,915.15
2 Portland Cemen/PC kg 8.190 1,600.00 13,104.00
3 Pasir Pasang (PP) M3 0.045 165,315.00 7,439.18
Jumlah Harga Bahan 93,458.33
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 188,658.33


E Harga satuan Pekerjaan 188,658.33

A.4.4.3.36 1 m2 Pasangan lantai keramik (ukuran 20x20cm) 221,353.32


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.700 75,000.00 52,500.00
2 Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
3 Kepala Tukang Batu L.03 OH 0.035 110,000.00 3,850.00
4 Mandor L.04 OH 0.035 110,000.00 3,850.00
Jumlah Tenaga Kerja 95,200.00
B Bahan
1 Keramik Kualitas II (Motif) M2 1.050 94,374.00 99,092.70
2 Portland Cemen/PC kg 10.400 1,600.00 16,640.00
3 Pasir Pasang (PP) M3 0.045 165,315.00 7,439.18
4 Semen Warna kg 0.162 18,404.00 2,981.45
Jumlah Harga Bahan 126,153.32
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 221,353.32


E Harga satuan Pekerjaan 221,353.32
A.4.4.3.54 1 m2 Pasangan keramik dinding 242,845.13
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.900 75,000.00 67,500.00
2 Tukang Batu L.02 OH 0.450 100,000.00 45,000.00
3 Kepala Tukang Batu L.03 OH 0.045 110,000.00 4,950.00
4 Mandor L.04 OH 0.045 110,000.00 4,950.00
Jumlah Tenaga Kerja 122,400.00
B Bahan
1 Keramik Kualitas II (Motif) M2 1.050 94,374.00 99,092.70
2 Portland Cemen/PC kg 9.300 1,600.00 14,880.00
3 Pasir Pasang (PP) M3 0.018 165,315.00 2,975.67
4 Semen Warna kg 0.190 18,404.00 3,496.76
Jumlah Harga Bahan 120,445.13
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 242,845.13


E Harga satuan Pekerjaan 242,845.13

A.4.4.3.58 1 m2 Pasangan dinding batu tempel hitam 370,487.03


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.700 75,000.00 52,500.00
2 Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
3 Kepala Tukang Batu L.03 OH 0.035 110,000.00 3,850.00
4 Mandor L.04 OH 0.035 110,000.00 3,850.00
Jumlah Tenaga Kerja 95,200.00
B Bahan
1 Batu tempel palimanan M2 1.100 227,910.00 250,701.00
2 Portland Cemen/PC kg 11.750 1,600.00 18,800.00
3 Pasir Pasang (PP) M3 0.035 165,315.00 5,786.03
Jumlah Harga Bahan 275,287.03
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 370,487.03


E Harga satuan Pekerjaan 370,487.03
A.4.5.1. HARGA SATUAN PEKERJAAN PLAFOND

A.4.5.1.7.a 1 m2 Plafond kalsiboard 58,386.34


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.100 75,000.00 7,500.00
2 Tukang Kayu L.02 OH 0.050 100,000.00 5,000.00
3 Kepala Tukang Kayu L.03 OH 0.005 110,000.00 550.00
4 Mandor L.04 OH 0.005 110,000.00 550.00
Jumlah Tenaga Kerja 13,600.00
B Bahan
1 Kalsiboard 120x240x3.5 mm lembar 0.364 115,560.00 42,063.84
2 Paku sekrup kg 0.110 24,750.00 2,722.50
Jumlah Harga Bahan 44,786.34
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 58,386.34


E Harga satuan Pekerjaan 58,386.34
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.32. 1 m2 Atap genteng metal 107,660.00


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.200 75,000.00 15,000.00
2 Tukang Kayu L.02 OH 0.100 100,000.00 10,000.00
3 Kepala Tukang Kayu L.03 OH 0.010 110,000.00 1,100.00
4 Mandor L.04 OH 0.001 110,000.00 110.00
Jumlah Tenaga Kerja 26,210.00
B Bahan
1 Genteng Metal Biasa m2 1.020 75,000.00 76,500.00
2 Paku sekrup kg 0.200 24,750.00 4,950.00
Jumlah Harga Bahan 81,450.00
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 107,660.00


E Harga satuan Pekerjaan 107,660.00

A.4.5.2.36. 1 m' Bubungan genteng metal 86,467.50


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.250 75,000.00 18,750.00
2 Tukang Kayu L.02 OH 0.150 100,000.00 15,000.00
3 Kepala Tukang Kayu L.03 OH 0.015 110,000.00 1,650.00
4 Mandor L.04 OH 0.013 110,000.00 1,430.00
Jumlah Tenaga Kerja 36,830.00
B Bahan
1 Bubungan Genteng Metal M2 1.100 44,000.00 48,400.00
2 Paku sekrup kg 0.050 24,750.00 1,237.50
Jumlah Harga Bahan 49,637.50
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 86,467.50


E Harga satuan Pekerjaan 86,467.50
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.2. 1 m3 Kusen pintu dan jendela (kayu kelas II) 11,507,062.00


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 6.000 75,000.00 450,000.00
2 Tukang Kayu L.02 OH 18.000 100,000.00 1,800,000.00
3 Kepala Tukang Kayu L.03 OH 1.800 110,000.00 198,000.00
4 Mandor L.04 OH 0.300 110,000.00 33,000.00
Jumlah Tenaga Kerja 2,481,000.00
B Bahan
1 Balok Kayu Klas II M3 1.200 7,444,500.00 8,933,400.00
2 Paku 5-12cm kg 1.250 27,820.00 34,775.00
3 Lem Kayu kg 1.000 57,887.00 57,887.00
Jumlah Harga Bahan 9,026,062.00
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 11,507,062.00


E Harga satuan Pekerjaan 11,507,062.00

A.4.6.1.5. 1 m2 Daun pintu panil (kayu kelas II) 740,223.50


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 1.000 75,000.00 75,000.00
2 Tukang Kayu L.02 OH 3.000 100,000.00 300,000.00
3 Kepala Tukang Kayu L.03 OH 0.300 110,000.00 33,000.00
4 Mandor L.04 OH 0.050 110,000.00 5,500.00
Jumlah Tenaga Kerja 413,500.00
B Bahan
1 Papan Kayu Klas II M3 0.040 7,444,500.00 297,780.00
2 Lem Kayu kg 0.500 57,887.00 28,943.50
Jumlah Harga Bahan 326,723.50
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 740,223.50


E Harga satuan Pekerjaan 740,223.50
A.4.6.1.6. 1 m2 Daun jendela kaca (kayu kelas II) 526,834.10
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.800 75,000.00 60,000.00
2 Tukang Kayu L.02 OH 2.400 100,000.00 240,000.00
3 Kepala Tukang Kayu L.03 OH 0.240 110,000.00 26,400.00
4 Mandor L.04 OH 0.040 110,000.00 4,400.00
Jumlah Tenaga Kerja 330,800.00
B Bahan
1 Papan Kayu Klas II M3 0.024 7,444,500.00 178,668.00
2 Lem Kayu kg 0.300 57,887.00 17,366.10
Jumlah Harga Bahan 196,034.10
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 526,834.10


E Harga satuan Pekerjaan 526,834.10

A.4.6.1.7. 1 m2 Daun jendela jalusi kayu kelas II 836,191.50


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.800 75,000.00 60,000.00
2 Tukang Kayu L.02 OH 2.400 100,000.00 240,000.00
3 Kepala Tukang Kayu L.03 OH 0.240 110,000.00 26,400.00
4 Mandor L.04 OH 0.040 110,000.00 4,400.00
Jumlah Tenaga Kerja 330,800.00
B Bahan
1 Papan Kayu Klas II M3 0.064 7,444,500.00 476,448.00
2 Lem Kayu kg 0.500 57,887.00 28,943.50
Jumlah Harga Bahan 505,391.50
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 836,191.50


E Harga satuan Pekerjaan 836,191.50
A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.2. 1 bh Kunci pintu 217,996.00


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.010 75,000.00 750.00
2 Tukang Kayu L.02 OH 0.500 100,000.00 50,000.00
3 Kepala Tukang Kayu L.03 OH 0.050 110,000.00 5,500.00
4 Mandor L.04 OH 0.005 110,000.00 550.00
Jumlah Tenaga Kerja 56,800.00
B Bahan
1 Kunci Pintu Mutu Menengah buah 1.000 161,196.00 161,196.00
Jumlah Harga Bahan 161,196.00
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 217,996.00


E Harga satuan Pekerjaan 217,996.00

A.4.6.2.5. 1 bh Engsel pintu 28,663.00


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.015 75,000.00 1,125.00
2 Tukang Kayu L.02 OH 0.150 100,000.00 15,000.00
3 Kepala Tukang Kayu L.03 OH 0.015 110,000.00 1,650.00
4 Mandor L.04 OH 0.0008 110,000.00 88.00
Jumlah Tenaga Kerja 17,863.00
B Bahan
1 Engsel biasa ps 1.000 10,800.00 10,800.00
Jumlah Harga Bahan 10,800.00
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 28,663.00


E Harga satuan Pekerjaan 28,663.00
A.4.6.2.5.a 1 bh Grendel pintu 32,163.00
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.015 75,000.00 1,125.00
2 Tukang Kayu L.02 OH 0.150 100,000.00 15,000.00
3 Kepala Tukang Kayu L.03 OH 0.015 110,000.00 1,650.00
4 Mandor L.04 OH 0.0008 110,000.00 88.00
Jumlah Tenaga Kerja 17,863.00
B Bahan
1 Grendel Besar buah 1.000 14,300.00 14,300.00
Jumlah Harga Bahan 14,300.00
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 32,163.00


E Harga satuan Pekerjaan 32,163.00

A.4.6.2.6. 1 bh Engsel jendela 22,705.00


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.010 75,000.00 750.00
2 Tukang Kayu L.02 OH 0.100 100,000.00 10,000.00
3 Kepala Tukang Kayu L.03 OH 0.010 110,000.00 1,100.00
4 Mandor L.04 OH 0.0005 110,000.00 55.00
Jumlah Tenaga Kerja 11,905.00
B Bahan
1 Engsel biasa ps 1.000 10,800.00 10,800.00
Jumlah Harga Bahan 10,800.00
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 22,705.00


E Harga satuan Pekerjaan 22,705.00

A.4.6.2.6.a 1 bh Grendel jendela 22,905.00


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.010 75,000.00 750.00
2 Tukang Kayu L.02 OH 0.100 100,000.00 10,000.00
3 Kepala Tukang Kayu L.03 OH 0.010 110,000.00 1,100.00
4 Mandor L.04 OH 0.0005 110,000.00 55.00
Jumlah Tenaga Kerja 11,905.00
B Bahan
1 Grendel Kecil buah 1.000 11,000.00 11,000.00
Jumlah Harga Bahan 11,000.00
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 22,905.00


E Harga satuan Pekerjaan 22,905.00
A.4.6.2.9. 1 bh Kait angin 24,955.00
Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.015 75,000.00 1,125.00
2 Tukang Kayu L.02 OH 0.150 100,000.00 15,000.00
3 Kepala Tukang Kayu L.03 OH 0.015 110,000.00 1,650.00
4 Mandor L.04 OH 0.0080 110,000.00 880.00
Jumlah Tenaga Kerja 18,655.00
B Bahan
1 Haag Angin Kecil stel 1.000 6,300.00 6,300.00
Jumlah Harga Bahan 6,300.00
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 24,955.00


E Harga satuan Pekerjaan 24,955.00

A.4.6.2.16. 1 m2 Kaca tebal 3mm 141,340.00


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.015 75,000.00 1,125.00
2 Tukang Kayu L.02 OH 0.150 100,000.00 15,000.00
3 Kepala Tukang Kayu L.03 OH 0.015 110,000.00 1,650.00
4 Mandor L.04 OH 0.0080 110,000.00 880.00
Jumlah Tenaga Kerja 18,655.00
B Bahan
1 Kaca Polos 3 mm m² 1.100 110,500.00 121,550.00
2 Sealant kg 0.050 22,700.00 1,135.00
Jumlah Harga Bahan 122,685.00
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 141,340.00


E Harga satuan Pekerjaan 141,340.00
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN

A.4.7.1.4. 1 m2 Pengecatan bidang kayu 56,940.16


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.070 75,000.00 5,250.00
2 Tukang Cat L.02 OH 0.009 100,000.00 900.00
3 Kepala Tukang Cat L.03 OH 0.006 110,000.00 660.00
4 Mandor L.04 OH 0.003 110,000.00 330.00
Jumlah Tenaga Kerja 7,140.00
B Bahan
1 Meni Kayu kg 0.200 36,915.00 7,383.00
2 Plamir Kayu kg 0.150 47,294.00 7,094.10
3 Cat Kayu Mutu Menengah kg 0.170 78,752.00 13,387.84
4 Cat Kayu Mutu Menengah kg 0.260 78,752.00 20,475.52
5 Kuas cat bh 0.010 11,150.00 111.50
6 Ampelas lembar 0.200 6,741.00 1,348.20
Jumlah Harga Bahan 49,800.16
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 56,940.16


E Harga satuan Pekerjaan 56,940.16

A.4.7.1.9. 1 m2 Pengecatan tembok 27,310.46


Harga Jumlah
No. Uraian Kode Satuan Koefisien Satuan Harga
Rp. Rp.
A Tenaga
1 Pekerja L.01 OH 0.020 75,000.00 1,500.00
2 Tukang Cat L.02 OH 0.063 100,000.00 6,300.00
3 Kepala Tukang Cat L.03 OH 0.0063 110,000.00 693.00
4 Mandor L.04 OH 0.003 110,000.00 330.00
Jumlah Tenaga Kerja 8,823.00
B Bahan
1 Plamir Tembok kg 0.100 12,305.00 1,230.50
2 Cat Tembok Mutu Menengah Kg 0.100 47,936.00 4,793.60
3 Cat Tembok Mutu Menengah Kg 0.260 47,936.00 12,463.36
Jumlah Harga Bahan 18,487.46
C Peralatan
Jumlah Harga Alat

D Jumlah (A+B+C) 27,310.46


E Harga satuan Pekerjaan 27,310.46
TABEL KEBUTUHAN BESI, BEGETING DAN BETON

A BETON SLOOF

KEBUTUHA
NO UKURAN BETON PANJANG DIAMETER DIAMETER JUMLAH JUMLAH BERAT BERAT BERAT TOTAL DIAMETER JUMLAH PANJANG BERAT BRT TOTAL TOTAL KEBUTUHAN BTN KEBUT.
N
TUL. TUL. TUL. TUL. TUL. TUL. PLESTERA
(CM) /M³ TUL. POKOK T. EKSTRA T. EKSTRA T. EKSTRA TUL. POKOK & TUL. BEGEL KEBUTUHAN PER M³ B.TING
POKOK POKOK BEGEL BEGEL BEGEL BEGEL N
(M) (MM) (MM) (BH) (BH) (KG) (KG) EKSTRA(KG) (MM) (BH) /BH (M) /M (KG) (KG) TUL. (KG) LUAS VOLUME (M2) BTN (M2)

15 X 20 33.3333 10.000 4.000 0.62 4 222.2222 0.7000 0.098596 97.5005 0.0297 0.9895 23.3333

82.163 15.34 8.8889

B BETON KOLOM
KEBUTUHA
NO UKURAN BETON PANJANG DIAMETER DIAMETER JUMLAH JUMLAH BERAT BERAT BERAT TOTAL DIAMETER JUMLAH PANJANG BERAT BRT TOTAL TOTAL KEBUTUHAN BTN KEBUT.
N
TUL. TUL. TUL. TUL. TUL. TUL. PLESTERA
(CM) /M³ TUL. POKOK T. EKSTRA T. EKSTRA T. EKSTRA TUL. POKOK & TUL. BEGEL KEBUTUHAN PER M³ B.TING
POKOK POKOK BEGEL BEGEL BEGEL BEGEL N
(M) (MM) (MM) (BH) (BH) (KG) (KG) EKSTRA(KG) (MM) (BH) /BH (M) /M (KG) (KG) TUL. (KG) LUAS VOLUME (M2) BTN (M2)

20 X 20 25.00 10.000 4.000 0.62 4 166.667 0.8000 0.098596 105.5799 0.0397 0.9922 20.0000

10.000 2.000 0.62 92.434 13.15 13.3333

15 X 15 44.44 10.000 4.000 0.62 4 253.968 0.6000 0.098596 124.5753 0.0222 0.9860 26.6667

- - - 109.551 15.02 17.7778

C BETON BALOK

KEBUTUHA
NO UKURAN BETON PANJANG DIAMETER DIAMETER JUMLAH JUMLAH BERAT BERAT BERAT TOTAL DIAMETER JUMLAH PANJANG BERAT BRT TOTAL TOTAL KEBUTUHAN BTN KEBUT.
N
TUL. TUL. TUL. TUL. TUL. TUL. PLESTERA
(CM) /M³ TUL. POKOK T. EKSTRA T. EKSTRA T. EKSTRA TUL. POKOK & TUL. BEGEL KEBUTUHAN PER M³ B.TING
POKOK POKOK BEGEL BEGEL BEGEL BEGEL N
(M) (MM) (MM) (BH) (BH) (KG) (KG) EKSTRA(KG) (MM) (BH) /BH (M) /M (KG) (KG) TUL. (KG) LUAS VOLUME (M2) BTN (M2)

15 X 20 33.3333 10.000 4.000 0.62 4 166.667 0.7000 0.098596 93.6662 0.0297 0.9895 23.3333

- - 82.163 11.50 18.3333

13 X 15 51.2821 10.000 4.000 0.62 4 256.410 0.5600 0.098596 140.5625 0.0192 0.9839 28.7179

- - 126.405 14.16 15.3846

C BETON PLAT

BERAT KEBUTUHA
NO UKURAN BETON PANJANG JARAK DIAMETER PANJANG JUMLAH BERAT BERAT TOTAL DIAMETER PANJANG JUMLAH BERAT TOTAL KEBUTUHAN BTN KEBUT.
TOTAL N
JML. LAPISAN PLESTERA
(CM) /M³ TULANGAN TUL. Arah X TUL. Arah X TUL. Arah X TUL. Arah X TUL. Arah X TUL. Arah Y TUL. Arah Y TUL. Arah Y TUL. Arah Y TUL. Arah Y KEBUTUHAN PER M³ B.TING
N
(M) (M) (MM) (M) (M) (KG) (MM) (M) (M) (KG) TUL. (KG) LUAS VOLUME (M2) BTN (M2)

C BETON PLAT

TBL X LBR

6 X 100 16.6667 1.000 0.15 10.000 1.00 111.11 0.62 10.000 16.67 6.67 0.62 136.9389 0.0600 0.9999 35.3333

- - - 68.469 68.469 16.6667

C BETON FOOT PLAT

BERAT KEBUTUHA
NO UKURAN BETON PANJANG JARAK DIAMETER PANJANG JUMLAH BERAT BERAT TOTAL DIAMETER PANJANG JUMLAH BERAT TOTAL KEBUTUHAN BTN KEBUT.
TOTAL N
JML. LAPISAN PLESTERA
(CM) /M³ TULANGAN TUL. Arah X TUL. Arah X TUL. Arah X TUL. Arah X TUL. Arah X TUL. Arah Y TUL. Arah Y TUL. Arah Y TUL. Arah Y TUL. Arah Y KEBUTUHAN PER M³ B.TING
N
(M) (M) (MM) (M) (M) (KG) (MM) (M) (M) (KG) TUL. (KG) LUAS VOLUME (M2) BTN (M2)

TBL X LBR

20 X 60 8.3333 2.000 0.15 12.000 0.60 55.56 0.89 12.000 8.33 4.00 0.89 118.3152 0.1200 0.9997 13.3333

- - - 59.158 59.158 5.0000


keterangan warna text :
Black (standar satuan harga bupati)
Orange (hasil rapat konsultan disetujui PU)
Red (hasil rapat konsultan direvisi PU)
Light Blue (perkiraan harga berdasarkan % kenaikan rata-
rata,tidak tertuang dalam buku standar satuan harga bupati)

HARGA SATUAN UPAH DAN BAHAN KAB. LOMBOK UTARA hrg. rekomendasi hrg. rekomendasi
2015 2016 2017 PROVINSI 2017 FIX 2016 FIX 2017
I. 1.2. Upah Pekerja
NO. URAIAN SATUAN BESARAN (Rp) BESARAN (Rp) BESARAN (Rp) BESARAN (Rp) BESARAN (Rp) BESARAN (Rp)

1 Pekerja di Hutan OH 50,000 60,000 70,000 60,000 70,000


2 Tukang Batu OH 72,000 85,000 100,000 85,000 85,000 100,000
3 Kepala Tukang Batu OH 77,000 90,000 110,000 90,000 90,000 110,000
4 Tukang Kayu OH 72,000 85,000 100,000 90,000 85,000 100,000
5 Kepala Tukang Kayu OH 79,000 90,000 110,000 90,000 90,000 110,000
6 Tukang Besi OH 72,000 85,000 100,000 85,000 85,000 100,000
7 Kepala Tukang Besi OH 78,000 90,000 110,000 90,000 90,000 110,000
8 Tukang Las OH 78,000 87,500 100,000 85,000 87,500 100,000
9 Kepala Tukang Las OH 83,000 92,500 110,000 92,500 92,500 110,000
10 Tukang Pelitur OH 78,000 85,000 100,000 85,000 85,000 100,000
11 Tukang Cat OH 78,000 85,000 100,000 85,000 85,000 100,000
12 Kepala Tukang Cat OH 83,000 90,000 110,000 90,000 90,000 110,000
13 Pemecah Batu OH 55,000 61,000 70,000 61,000 61,000 70,000
14 Penggergaji OH 55,000 61,000 70,000 61,000 61,000 70,000
15 Mandor Pengisi Bronjong OH 77,000 85,000 100,000 85,000 100,000
16 Pengisi Bronjong OH 55,000 85,000 100,000 61,000 85,000 100,000
17 Penganyam Bronjong OH 72,000 95,000 110,000 85,000 95,000 110,000
18 Kepala Penganyam Bronjong OH 83,000 90,000 120,000 90,000 90,000 120,000
19 Pekerja terlatih OH 58,000 65,000 75,000 70,000 65,000 75,000
20 Pekerja OH 55,000 65,000 75,000 66,000 65,000 75,000
21 Mandor OH 84,000 95,000 110,000 95,500 95,000 110,000
22 Sopir OH 70,000 80,000 100,000 80,000 80,000 100,000
23 Pembantu sopir OH 50,000 61,000 70,000 61,000 61,000 70,000
24 Mekanik OH 70,000 87,500 100,000 87,500 87,500 100,000
25 Pembantu Mekanik OH 65,000 82,500 90,000 82,500 82,500 90,000
26 Operator alat ringan OH 60,000 72,500 85,000 72,500 72,500 85,000
27 Operator alat berat OH 85,000 97,500 115,000 97,500 97,500 115,000
28 Pembantu operator OH 55,000 70,000 85,000 70,000 70,000 85,000
29 Pemasak aspal OH 55,000 70,000 85,000 61,000 70,000 85,000
30 Penunjuk Jalan OH 75,000 95,000 110,000 95,000 95,000 110,000
31 Tukang Pipa PVC OH 63,000 72,500 85,000 72,500 72,500 85,000
32 Tukang Pipa Besi OH 63,000 72,500 85,000 72,500 72,500 85,000
33 Tukang Listrik OH 63,000 72,500 85,000 75,000 72,500 85,000
34 Kepala Tukang Listrik OH 72,000 82,500 95,000 82,500 82,500 95,000
35 Penjaga malam OH 50,000 60,000 70,000 60,000 70,000

I. 7. PEKERJAAN SIPIL/BANGUNAN

I.7.1. HARGA SATUAN BAHAN

I.7.1.1. Bahan Pasangan

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Batu kali M3 183,000 210,900 231,990 181,500 210,900 231,990


2 Batu pecah 5-7 cm M3 196,000 226,600 249,260 249,260 226,600 249,260
3 Batu pecah 3-5 cm M3 294,000 337,400 371,140 313,390 337,400 371,140
4 Batu pecah 2-3 cm M3 317,000 364,000 400,400 338,030 364,000 400,400
5 Kerikil alam 0.5/1 cm M3 370,000 425,800 468,380 326,700 425,800 468,380
6 Kerikil Alam 2/3 cm M3 242,000 306,900 337,590 337,590 306,900 337,590
7 Kerikil Alam 1/2 - 1 cm M3 275,000 316,200 347,820 326,700 316,200 347,820
8 Kerikil Pecah 2/3 cm M3 271,000 311,900 343,090 311,900 343,090
9 Kerikil pecah 1/2 cm M3 279,000 320,700 352,770 326,700 320,700 352,770
10 Agregate kasar (stone crusher) M3 306,000 351,700 386,870 359,370 351,700 386,870
11 Agregate halus (stone crusher) M3 347,000 398,700 438,570 442,860 398,700 438,570
12 Bata merah kelas 1 buah 650 700 770 770 700 770
13 Bata merah kelas 2 buah 500 600 660 660 600 660
14 Pasir Pasang (PP) M3 134,000 154,500 169,950 163,350 146,775 169,950
15 Pasir Beton (PB) M3 160,000 183,600 201,960 181,500 183,600 201,960
16 Pasir urug M3 127,000 146,500 161,150 145,200 146,500 161,150
17 Sirtu M3 149,000 171,200 188,320 144,500 171,200 188,320
18 Tanah urug M3 93,000 106,800 117,480 114,950 101,460 117,480
19 Tanah urug Pilihan M3 139,000 159,000 174,900 151,250 159,000 174,900
20 Tanah Liat M3 73,000 84,100 92,510 199,650 84,100 92,510
21 Semen PC. Merk Tiga Roda zak( 50 kg) 80,000 94,800 104,280 85,250 94,800 104,280
22 Semen PC. Merk Gresik zak (50 kg) 80,000 94,800 104,280 84,700 94,800 104,280
23 Semen PC. Merk Tonasa zak (50 kg) 77,000 88,500 97,350 82,280 88,500 97,350
24 Semen PC. Merk Padang zak (50 kg) 61,000 72,500 79,750 72,500 79,750
25 Semen PC. Merk Bosuwa zak (50 kg) 74,000 85,100 93,610 78,650 85,100 93,610
26 Semen Grouting zak (50 kg) 180,500 198,550 180,500 198,550
27 Portland Cemen/PC kg 2,000 2,200 2,420 1,600 1,600
28 Semen warna kg 17,000 19,900 21,890 15,100 19,900 21,890
29 Semen warna butiran kasar kg 15,000 17,200 18,920 17,200 18,920
30 Rumput Gebalan m2 20,000 22,700 24,970 24,200 22,700 24,970
31 Kapur gamping kg 6,000 6,500 7,150 1,850 6,500 7,150
32 Kapur biasa kg 15,000 16,600 18,260 825 16,600 18,260
33 Kapur Pasang M3 321,000 368,700 405,570 368,700 405,570
34 List plafon (propil) 64 cm m³ 21,000 25,600 28,160 25,600 28,160
35 List plafon 4x4 Batang 21,000 24,200 26,620 24,200 26,620
36 List plafon Gypsum M' 32,000 37,100 40,810 32,450 37,100 32,450
37 Aspal (Aspal Concrete/ AC ) Kg 12,000 13,700 15,070 18,500 13,700 15,070
38 Aspal (Medium Curring/ MC) Kg 12,000 13,700 15,070 19,800 13,700 15,070
39 Aspal emulsi Kg 13,000 15,400 16,940 17,160 15,400 16,940
40 Filler (abu batu ) Kg 3,000 3,000 3,300 2,750 3,000 3,300
41 Buton Granular Asphalt (BGA) Kg 2,000 2,900 3,190 2,550 2,900 3,190
42 Batu tempel hitam M2 133,000 153,000 168,300 153,000 168,300
43 Roster Pejaten 10x10x20 cm buah 4,000 4,800 5,280 4,800 5,280
44 Roster Pejaten 10x10x10 cm buah 3,000 3,400 3,740 3,400 3,740
45 List profil 4/4 cm m 21,000 23,100 24,200 21,000 23,100
46 List plapon kayu m 6,500 7,150 6,500 7,150

I.7.1.2. Bahan Atap

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Sirap Kalimantan buah 2,000 2,500 2,750 2,550 2,500 2,550


2 Genteng Lokal buah 2,000 2,200 2,420 2,450 2,200 2,450
3 Bubungan asbes set 72,000 82,800 91,080 81,900 82,800 81,900
4 Bubungan Genteng Lokal M' 3,000 4,000 4,400 2,900 2,750 2,900
5 Bubungan Genteng Beton buah 3,000 4,000 4,400 6,600 4,000 4,400
6 Bubungan Genteng Silang M' 4,000 5,000 5,500 4,200 3,900 4,200
7 Bubungan Genteng Pejaten (uk. Menengah) buah 4,000 5,000 5,500 4,550 5,000 4,550
8 Bubungan Genteng metal M2 157,000 181,000 199,100 40,000 44,000
9 bubungan metal biasa M' 101,000 110,000 121,000 110,000 121,000
10 Bubungan genteng mantili M' 27,000 31,500 34,650 31,500 34,650
11 Bubungan Spandeck M' 68,000 77,000 84,700 25,000 27,500
12 Atap Spandeck M2 87,000 100,100 110,110 45,800 55,000
13 Genteng Beton/Pres buah 2,000 2,500 2,750 6,400 2,500 2,750
14 Genteng mantili M2 65,000 74,200 81,620 74,200 81,620
15 Genteng Silang/Kodok buah 3,000 3,100 3,410 3,850 3,100 3,410
16 Plesing M' 134,000 154,300 169,730 154,300 169,730
17 Genteng Pejaten (sudah di cat) buah 3,000 2,900 3,190 3,150 2,900 3,150
18 Genteng Metal Finishing tekstur m2 167,000 192,500 211,750 192,500 211,750
19 Genteng Metal Biasa m2 114,000 131,300 144,430 60,000 75,000
20 Genteng Kaca buah 15,000 17,400 19,140 17,250 16,050 17,250
21 Genteng Keramik buah 13,000 15,100 16,610 19,100 15,100 19,100
22 Genteng Keramik warna coklat M2 98,000 112,500 123,750 112,500 123,750
23 Bubungan Genteng Keramik buah 13,000 15,100 16,610 16,550 15,100 16,550
24 Asbes Gelombang Kecil 1 x 1.8 m lembar 44,000 50,000 55,000 41,800 45,980
25 Asbes Gelombang Besar 1 x 2.5 m lembar 145,000 167,000 183,700 141,250 155,375
26 Asbes Bubungan Glmb. Kecil pasang 37,000 42,800 47,080 35,950 39,545
27 Asbes Bubungan Glmb. Besar lembar 72,000 82,800 91,080 75,950 83,545
28 Asbes type genteng (tyluq) lembar 58,000 66,700 73,370 63,550 66,700 63,550
29 Seng Glmb. Besar BJLS 20 lembar 54,000 62,200 68,420 61,000 62,200 61,000
30 Seng Glmb. Besar BJLS 25 lembar 76,000 87,500 96,250 73,700 68,300 73,700
31 Seng Glmb. Besar BJLS 30 lembar 89,000 101,600 111,760 82,600 76,550 82,600
32 Seng Glmb. Kecil BJLS 20 lembar 60,000 68,400 75,240 69,900 64,750 69,900
33 Plapon Eternit 1x1 m2 lembar 17,000 20,000 22,000 20,000 22,000
34 Kalsiboard 120x240x3.5 mm lembar 77,000 88,600 97,460 88,600 97,460
35 Seng Plat BJLS 18 lembar 38,000 43,400 47,740 26,500 29,150
36 Seng Plat BJLS 20 lembar 67,000 77,400 85,140 35,350 38,885
37 Seng Plat BJLS 25 lembar 95,000 107,500 118,250 53,000 58,300
38 Seng Plat BJLS 30 lembar 111,000 127,700 140,470 76,550 84,205
39 Ijuk kg 22,000 25,700 28,270 25,450 23,550 25,450

I.7.1.3. Bahan Kayu

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Papan Kayu Klas I M3 10,450,000 12,017,500 13,219,250 19,965,000 12,017,500 13,219,250


2 Balok Kayu Klas I M3 10,450,000 12,017,500 13,219,250 19,360,000 12,017,500 13,219,250
3 Papan Kayu Klas II M3 6,050,000 6,957,500 7,653,250 15,125,000 6,957,500 7,653,250
4 Balok Kayu Klas II M3 6,050,000 6,957,500 7,653,250 14,520,000 6,957,500 7,653,250
5 Papan Kayu Klas III M3 4,511,000 5,187,600 5,706,360 5,445,000 5,187,600 5,706,360
6 Balok Kayu Klas III M3 4,511,000 5,187,600 5,706,360 4,840,000 5,187,600 5,706,360
7 Dolken / Perancah Dia.10 Cm - 4 M batang 22,000 25,300 27,830 19,200 25,300 27,830
8 Papan kayu bekisting M3 2,751,000 3,163,500 3,479,850 3,630,000 3,163,500 3,479,850
9 Balok kayu bekisting M3 2,751,000 3,163,600 3,479,850 3,025,000 3,163,600 3,479,850
10 Roster kayu kls II uk. 30x30 cm buah 61,000 70,100 77,110 70,100 77,110
11 Lumbersering Kls I M3 2,333,000 2,682,900 2,951,190 440,000 2,682,900 2,951,190
12 Lumbersering Kls II M3 2,196,000 2,525,000 2,777,500 385,000 2,525,000 2,777,500

I.7.1.4. Bahan Bambu

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Bambu (dia.12.5 cm. P - 6 m) batang 22,000 25,300 27,830 24,200 25,300 27,830
2 Bambu (dia.10 cm. P- 6 m) batang 19,000 22,100 24,310 21,150 22,100 24,310
3 Bambu (dia.7 cm. P- 6 m) batang 17,000 19,600 21,560 18,150 19,600 21,560
4 Bedek kulitan M3 42,000 47,800 52,580 44,150 47,800 52,580
5 Bedek biasa M3 39,000 45,000 49,500 42,350 45,000 49,500
6 Bedek pagar M3 33,000 37,400 41,140 34,450 37,400 41,140

I.7.1.5. Bahan Cetak

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Lubang Angin 10x20 Cm buah 7,500 8,500 9,350 7,950 7,800 7,800
2 Lubang Angin 20x20 Cm buah 8,000 9,100 10,010 8,500 8,250 8,250
3 Lubang Angin 30x30 Cm buah 10,000 11,000 12,100 10,250 10,500 10,500
4 Buis Beton Dia. 10 Cm bh.L= 0.5M 51,000 85,400 93,940 54,450 53,000 53,000
5 Buis Beton Dia. 20 Cm bh.L= 0.5M 59,000 68,300 75,130 63,500 68,300 68,300
6 Buis Beton Dia. 30 Cm bh.L= 0.5M 72,000 75,900 83,490 92,000 74,200 74,200
7 Buis Beton Dia. 40 Cm bh.L= 0.5M 86,000 98,900 108,790 92,000 89,500 89,500
8 Buis Beton Dia. 60 Cm bh.L= 0.5M 108,000 124,000 136,400 115,500 112,450 112,450
9 Buis Beton Dia. 80 Cm bh.L= 0.5M 142,000 163,000 179,300 151,250 147,150 147,150
10 Batako 10 x 20 x 40 Cm buah 3,000 3,000 3,300 2,900 2,850 2,850
11 Paving blok press type bata t=8 cm buah 2,500 2,700 2,970 2,650 2,600 2,600
12 Paving blok biasa type bata t=8 cm buah 1,500 1,700 1,870 2,100 1,700 1,870
13 Paving blok press type berlian t=8 cm buah 2,500 2,700 1,970 2,750 2,700 1,970
14 coneblock HB-10 buah 4,000 4,400 4,000 4,400
15 coneblock HB-15 buah 5,100 5,610 5,100 5,610
16 coneblock HB-20 buah 5,400 5,940 5,400 5,940

7.1.6. Bahan Lantai

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Tegel Abu-abu M2 42,000 48,100 52,910 43,900 42,800 47,080


2 Tegel Bergaris Abu 20 x 20 Cm. M2 54,000 61,600 67,760 65,100 54,700 60,170
3 Tegel Warna M2 46,500 53,300 58,630 48,650 47,450 52,195
4 Tegel Bergaris Warna 20 x 20 Cm. M2 59,000 67,700 74,470 61,750 60,100 66,110
5 Tegel Traso Klas I M2 60,000 69,400 76,340 63,250 61,600 67,760
6 Tegel Traso Klas II 30 x 30 M2 55,000 62,800 69,080 57,200 55,800 61,380
7 Keramik dinding Kw I (motif) M2 70,000 80,800 88,880 80,800 88,880
8 Keramik dinding Kw I (polos) M2 59,000 67,600 74,360 73,600 67,600 74,360
9 Porselin Kualitas I (Polos) M2 61,000 69,600 76,560 74,800 82,280
10 Keramik Kualitas I (Motif) M2 91,000 104,400 114,840 95,150 92,750 102,025
11 Keramik Kualitas II (Motif) M2 77,000 88,200 97,020 80,550 78,450 86,295
12 Keramik Kualitas I (polos) M2 62,000 71,200 78,320 64,900 63,250 69,575
13 Keramik Kualitas II (polos) M2 56,000 64,900 71,390 58,450 56,900 62,590
14 Keramik Cutting 30 X 50 M2 150,000 37,300 41,030 156,650 37,300 41,030
15 Marmer Kualitas I M2 367,000 422,400 464,640 384,900 374,450 411,895
16 Marmer Kualitas II M2 313,000 359,500 395,450 327,500 318,700 350,570
17 Batu Tempel palimanan M2 185,000 213,000 234,300 213,000 234,300

I.7.1.7. Bahan Besi

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Besi Beton Ulir kg 19,000 19,800 20,900 21,250 19,000 19,000


2 Besi Beton Polos kg 24,500 28,100 26,950 20,050 19,050 19,050
3 Besi beton dia 12 mm ljr 250,000 287,000 315,700 287,000 287,000
4 Besi beton dia 8 mm ljr 111,000 127,500 140,250 127,500 127,500
5 Besi siku 30x30x3 mm Kg 25,000 28,400 31,240 28,400 31,240
6 Besi Plat Ukuran 3 mm (Uk. 1.20 m x 2.40 m x 3 lembar 997,000 1,146,900 1,261,590 1,146,900 1,261,590
7 Besi profil siku ( EX KS ) Kg 23,000 25,800 28,380 25,800 28,380
8 Besi profil canal (EX KS) Kg 23,000 25,800 28,380 25,800 28,380
9 Besi plat ( EX KS ) Kg 23,000 26,500 29,150 21,450 26,500 29,150
10 Pipa GI 2" M' 122,000 140,400 154,440 140,400 154,440
11 Pipa black steel (S 40) M' 28,000 32,500 35,750 32,500 35,750
12 Kawat Beton kg 23,000 25,900 28,490 27,300 25,000 27,500
13 Kawat Nyamuk Besi m² 24,000 27,800 30,580 27,300 27,800 27,300
14 Kawat Nyamuk Plastik m² 21,000 24,100 26,510 21,250 24,100 21,250
15 Kawat Saringan Pasir m² 24,000 27,200 29,920 26,650 27,200 26,650
16 Kawat Duri rol 120,000 138,000 151,800 132,150 138,000 132,150
17 Kawat bronjong digalvanisir kg 31,000 35,800 39,380 30,000 33,000
18 Kawat 3 mm (gulungan) kg 20,000 23,000 25,300 35,000 23,000 25,300
19 Kawat 4 mm (gulungan) kg 20,000 23,000 25,300 35,000 23,000 25,300
Kawat bronjong pabrikasi lubang 8x10 Heavy
20 unit 312,500 569,400 626,340 500,300 569,400 569,400
Galv. Uk.
Kawat 2.0 x 1.0
bronjong x 0.5 dia
pabrikasi 2.7 mm
lubang 8x10 Heavy
21 unit 606,000 696,400 766,040 565,000 696,400 696,400
Galv. Uk.
Kawat 2.0 x 1.0
bronjong x 0.5 dia
pabrikasi 3 mm8x10 Heavy
lubang
22 unit 722,000 830,500 913,550 682,700 830,500 830,500
Galv. & PVC Uk. 2.0 x 1.0 x 0.5 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy
23 unit 726,000 834,800 918,280 741,550 834,800 834,800
Galv.
KawatUk. 3.0 x 1.0
bronjong x 0.5 dia
pabrikasi 2.7 mm
lubang 8x10 Heavy
24 unit 853,000 980,400 1,078,440 829,850 980,400 980,400
Galv. Uk.
Kawat 3.0 x 1.0
bronjong x 0.5 dia
pabrikasi 3 mm8x10 Heavy
lubang
25 unit 1,007,000 1,157,800 1,273,580 1,000,450 1,157,800 1,157,800
Galv.
Kawat&bronjong
PVC Uk.pabrikasi
3.0 x 1.0 lubang
x 0.5 dia 2.7Heavy
8x10 mm
26 unit 1,018,000 1,170,700 1,287,770 1,035,800 1,170,700 1,170,700
Galv. Uk. 3.0 x 1.5 x 0.5 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy
27 unit 1,162,000 1,336,100 1,469,710 1,153,500 1,336,100 1,336,100
Galv.
KawatUk. 3.0 x 1.5
bronjong x 0.5 dia
pabrikasi 3 mm8x10 Heavy
lubang
28 unit 1,424,000 1,637,700 1,801,470 1,412,400 1,637,700 1,637,700
Galv. &bronjong
Kawat PVC Uk.pabrikasi
3.0 x 1.5 lubang
x 0.5 dia 2.7Heavy
8x10 mm
29 unit 983,000 1,129,900 1,242,890 97,100 1,129,900 1,129,900
Galv. Uk. 4.0 x 1.0 x 0.5 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy
30 unit 1,097,000 1,185,000 1,303,500 1,088,800 1,185,000 1,185,000
Galv. Uk. 4.0 x 1.0 x 0.5 dia 3 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy
31 unit 1,330,000 1,529,300 1,682,230 1,441,900 1,529,300 1,529,300
Galv.
Kawat&bronjong
PVC Uk.pabrikasi
4.0 x 1.0 lubang
x 0.5 dia 2.7Heavy
8x10 mm
32 unit 542,000 622,700 684,970 553,200 622,700 622,700
Galv. Uk.
Kawat 1.5 x 1.0
bronjong x 1.0 dia
pabrikasi 2.7 mm
lubang 8x10 Heavy
33 unit 604,000 694,100 763,510 615,050 694,100 694,100
Galv. Uk. 1.5 x 1.0 x 1.0 dia 3 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy
34 unit 733,000 842,300 926,530 747,450 842,300 842,300
Galv. & PVC Uk. 1.5 x 1.0 x 1.0 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy
35 unit 754,000 866,700 953,370 771,000 866,700 866,700
Galv. Uk.
Kawat 2.0 x 1.0
bronjong x 1.0 dia
pabrikasi 2.7 mm
lubang 8x10 Heavy
36 unit 839,000 964,200 1,060,620 859,250 964,200 964,200
Galv. Uk.
Kawat 2.0 x 1.0
bronjong x 1.0 dia
pabrikasi 3 mm8x10 Heavy
lubang
37 unit 1,005,000 1,155,600 1,271,160 1,029,950 1,155,600 1,155,600
Galv. & PVC Uk. 2.0 x 1.0 x 1.0 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy
38 unit 1,064,000 1,223,100 1,345,410 1,088,800 1,223,100 1,223,100
Galv. Uk. 3.0 x 1.0 x 1.0 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy
39 unit 1,188,000 1,365,700 1,502,270 1,212,350 1,365,700 1,365,700
Galv. Uk.
Kawat 3.0 x 1.0
bronjong x 1.0 dia
pabrikasi 3 mm8x10 Heavy
lubang
40 unit 1,449,000 1,665,800 1,832,380 1,477,200 1,665,800 1,665,800
Galv.
Kawat&bronjong
PVC Uk.pabrikasi
3.0 x 1.0 lubang
x 1.0 dia 2.7Heavy
8x10 mm
41 unit 1,388,000 1,596,400 1,756,040 1,441,900 1,596,400 1,596,400
Galv. Uk. 4.0 x 1.0 x 1.0 dia 2.7 mm
Kawat bronjong pabrikasi lubang 8x10 Heavy
42 unit 1,563,000 1,797,100 1,976,810 1,594,900 1,797,100 1,797,100
Galv.
KawatUk. 4.0 x 1.0
bronjong x 1.0 dia
pabrikasi 3 mm8x10 Heavy
lubang
43 unit 1,879,000 2,161,100 2,377,210 1,918,550 2,161,100 2,161,100
Galv. & PVC Uk. 4.0 x 1.0 x 1.0 dia 2.7 mm
44 Pipa GI 1/2" m' 34,100 37,400 37,550 32,100 37,400
45 Rolling Door allumunium m2 535,000 588,500 588,500 535,000 588,500
46 Mur Baut BRC M8x80 buah 2,200 2,420 2,450 2,200 2,420
47 Besi strip kg 19,300 21,230 21,250 19,300 21,230
48 Besi Angkur Ø 8 mm kg 19,100 21,010 21,050 19,100 21,010

I.7.1.8. Bahan Langit-Langit

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Eternit 100x100 Cm lembar 47,000 54,300 59,730 21,250 54,300 21,250


2 Triplek 120x240x2 mm lembar 67,000 76,800 84,480 63,600 76,800 63,600
3 Triplek 120x240x3 mm lembar 75,500 86,800 95,480 70,650 70,650 70,650
4 Triplek 120x240x6 mm lembar 130,000 149,700 164,670 105,950 105,950 105,950
5 Triplek 120x240x9 mm lembar 171,000 196,200 215,820 169,550 169,550 169,550
6 Triplek 120x240x12 mm lembar 236,000 271,600 298,760 219,050 271,600 219,050
7 Triplek 120x240x18 mm lembar 333,000 382,400 420,640 306,050 382,400 306,050
8 Triplek lapis aluminium lembar 157,000 180,800 198,880 147,200 147,500 147,500
9 Calsiboard 120x240x3.5 mm lembar 94,000 108,000 118,800 82,400 108,000 108,000
10 Calsiboard 120x240x6 mm lembar 116,000 133,300 146,630 100,100 133,300 133,300
11 Playwood 120x240x3 mm lembar 82,500 94,800 104,280 94,800 104,280
12 Teakwood 120x240x3 mm lembar 149,500 171,800 188,980 135,450 135,450 135,450
13 Formika Putih 120x240 Cm lembar 215,000 247,700 272,470 201,550 210,550 201,550
14 Formika Warna 120x240 Cm lembar 242,000 278,700 306,570 226,750 226,750 226,750
15 Gysumboard 120x240x9mm M' 20,000 22,700 24,970 17,750 17,750 17,750
16 List Gypsum M' 34,000 39,400 43,340 32,450 32,450 32,450
17 Kayu list profil 4/4 cm M' 5,000 5,700 6,270 7,150 5,700 6,270
18 GRC ( 6 mm ) lembar 159,000 182,600 200,860 161,950 182,600 161,950
19 GRC ( 9 mm ) lembar 226,000 259,900 285,890 221,350 259,900 221,350
20 GRC ( 12 mm ) lembar 36,000 418,000 459,800 258,950 418,000 258,950
21 Lem Kayu kg 47,000 54,100 59,510 44,250 44,250 44,250

I.7.1.9. Bahan Pipa

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

PIPA GI
1 Pipa GI Ø ½" & Accessories M' 147,400 154,400 42,300 35,310 42,300
2 Pipa GI Ø ¾" & Accessories M' 45,100 47,300 52,030 47,300 52,030
3 Pipa GI Ø 1" & Accessories M' 52,800 55,700 61,270 55,700 61,270
4 Pipa GI Ø 1 ½" & Accessories M' 80,300 83,600 97,960 83,600 97,960
5 Pipa GI Ø 2" & Accessories M' 134,200 140,400 154,440 140,400 154,440
6 Pipa GI Ø 3" & Accessories M' 226,600 236,500 260,150 236,500 260,150
7 Pipa GI Ø 4" & Accessories M' 364,100 380,800 418,880 380,800 418,880
8 Pipa GI Ø 6" & Accessories M' 537,900 562,600 618,860 562,600 618,860
9 Pipa GI Ø 8" & Accessories M' 902,000 942,900 1,037,190 942,900 1,037,190
10 Pipa GI Ø 10" & Accessories M' 1,398,100 1,462,000 1,608,200 1,462,000 1,608,200
11 Pipa GI Ø 12" & Accessories M' 1,739,100 1,818,000 1,999,800 1,818,000 1,999,800
12 Pipa GI Ø 14" & Accessories M' 2,139,500 2,236,200 2,459,820 2,236,200 2,459,820
13 Pipa GI Ø 16" & Accessories M' 2,538,800 2,654,600 2,920,060 2,654,600 2,920,060
PIPA PVC -
14 Pipa PVC Ø ½" & Accessories M' 6,600 6,800 7,480 6,400 7,480
15 Pipa PVC Ø ¾" & Accessories M' 8,800 9,100 10,010 7,000 10,010
16 Pipa PVC Ø 2/3" & Accessories M' 13,200 14,000 15,400 14,000 15,400
17 Pipa PVC Ø 1" & Accessories M' 40,700 42,500 46,750 13,000 46,750
18 Pipa PVC Ø 2" & Accessories M' 51,700 54,200 59,620 44,000 59,620
19 Pipa PVC Ø 3" & Accessories M' 113,300 118,300 130,130 96,000 130,130
20 Pipa PVC Ø 4" & Accessories M' 171,600 178,900 196,790 146,000 196,790
21 Pipa PVC Ø 6" & Accessories M' 357,500 374,300 411,730 374,300 411,730
22 Pipa PVC Ø 8" & Accessories M' 438,900 458,600 504,460 458,600 504,460
23 Pipa PVC Ø 10" & Accessories M' 812,900 849,900 934,890 849,900 934,890
24 Pipa PVC Ø 12" & Accessories M' 1,349,700 1,410,800 1,551,880 1,410,800 1,551,880
25 Pipa PVC Ø 14" & Accessories M' 1,889,800 1,975,100 2,172,610 1,975,100 2,172,610
26 Pipa PVC Ø 16" & Accessories M' 2,403,500 2,513,000 2,764,300 2,513,000 2,764,300
PIPA HDPE -
27 Pipa HDPE Ø ¾ " M' 14,300 14,500 15,950 13,100 14,500 13,100
28 Pipa HDPE Ø 1" M' 20,900 21,500 23,650 19,400 21,500 19,400
29 Pipa HDPE Ø 1¼ " M' 33,000 34,900 38,390 31,350 34,900 31,350
30 Pipa HDPE Ø 1½ " M' 51,700 53,600 58,960 48,100 53,600 48,100
31 Pipa HDPE Ø 2 " M' 81,400 84,800 93,280 75,800 84,800 75,800
32 Pipa HDPE Ø 2½ " M' 113,300 118,600 130,460 106,300 118,600 106,300
33 Pipa HDPE Ø 3 " M' 163,900 171,200 188,320 153,250 171,200 153,250
34 Pipa HDPE Ø 4 " M' 247,500 258,600 284,460 231,800 258,600 231,800
35 Pipa HDPE Ø 4½ " M' 312,400 326,400 359,040 292,400 326,400 292,400
36 Pipa HDPE Ø 5 " M' 361,900 377,700 415,470 338,150 377,700 338,150
37 Pipa HDPE Ø 6 " M' 511,500 534,500 587,950 478,650 534,500 478,650
38 Pipa HDPE Ø 7 " M' 595,100 622,300 684,530 557,150 622,300 557,150
39 Pipa HDPE Ø 8 " M' 794,200 830,300 913,330 743,200 830,300 743,200
40 Pipa HDPE Ø 9 " M' 931,700 973,900 1,071,290 871,750 973,900 871,750
41 Pipa HDPE Ø 10 " M' 1,139,600 1,191,400 1,310,540 1,066,350 1,191,400 1,066,350
42 Pipa HDPE Ø 11 " M' 1,433,300 1,498,600 1,648,460 1,341,350 1,498,600 1,341,350
43 Pipa HDPE Ø 12 " M' 1,813,900 1,896,200 2,085,820 1,697,100 1,896,200 1,697,100
44 Pipa HDPE Ø 14 " M' 2,312,200 2,417,000 2,658,700 2,162,950 2,417,000 2,162,950
45 Pipa HDPE Ø 16 " M' 2,921,600 3,054,700 3,360,170 2,733,650 3,054,700 2,733,650
46 Pipa HDPE Ø 18 " M' 4,119,500 4,306,900 4,737,590 3,854,400 4,306,900 3,854,400
47 Pipa HDPE Ø 20 " M' 3,975,400 5,306,000 5,836,600 4,748,600 5,306,000 4,748,600
48 Pipa HDPE Ø 22 " M' 6,376,700 6,666,000 7,332,600 5,965,550 6,666,000 5,965,550
49 Pipa HDPE Ø 24 " M' 8,060,800 8,427,700 9,270,470 7,542,050 8,427,700 7,542,050
50 Pipa HDPE Ø 28 " M' 10,243,200 10,708,600 11,779,460 9,583,200 10,708,600 9,583,200
51 Pipa HDPE Ø 32 " M' 13,029,500 13,621,300 14,983,430 12,189,900 13,621,300 12,189,900
PIPA TIDAK BERTEKANAN -
1 Pipa GI Ø 3" M' 90,200 94,200 103,620 84,600 94,200 84,600
2 Pipa PVC Ø 3" M' 36,300 38,300 42,130 45,000 38,300 42,130
3 Pipa PVC Ø 4" M' 45,100 47,600 52,360 74,150 47,600 52,360
4 Pipa Screen Ø 4" bh 24,200 25,500 28,050 23,000 25,500 23,000
5 Pipa PVC Ø 6" M' 105,600 110,100 121,110 98,700 110,100 98,700
6 Bend 90 o Pipa PVC AW Ø 3" bh 145,200 152,100 167,310 136,300 152,100 136,300
7 Reducer PVC Ø 6"- 4" bh 46,200 48,500 53,350 43,600 48,500 43,600
8 Kran Ø 3" bh 493,900 516,700 568,370 462,450 516,700 462,450
9 Lem PVC kg 146,300 152,400 167,640 136,650 152,400 136,650
ACESSORIS PIPA -
1 Stop Kran -
Stop Kran Dia ½" Buah 92,000 105,700 116,270 63,500 105,700 63,500
Stop Kran Dia ¾" Buah 95,000 108,800 119,680 97,600 108,800 97,600
Stop Kran Dia 1" Buah 233,000 268,300 295,130 240,250 268,300 240,250
Stop Kran Dia 1½" Buah 420,000 482,900 531,190 432,450 482,900 432,450
Stop Kran Dia 2" Buah 622,000 715,400 786,940 640,450 715,400 640,450
Stop Kran Dia 2½'' Buah 1,202,000 1,545,500 1,700,050 1,237,100 1,545,500 1,237,100
Stop Kran Dia 3" Buah 1,697,000 1,951,400 2,146,540 1,746,400 1,951,400 1,746,400
2 Kran -
Kran Dia ½" Buah 33,000 38,000 41,800 33,800 38,000 33,800
Kran Dia ¾" Buah 47,000 54,000 59,400 48,850 54,000 48,850
3 Bend GI 90 o (Knee) -
Bend GI 90 o (Knee) Dia ½" Buah 50,000 57,000 6,270 5,300 57,000 5,300
Bend GI 90 o (Knee) Dia ¾" Buah 7,000 8,000 8,800 10,050 8,000 8,800
Bend GI 90 o (Knee) Dia 1" Buah 10,000 11,500 12,650 10,450 11,500 10,450
Bend GI 90 o (Knee) Dia 1½" Buah 20,000 24,000 26,400 20,700 24,000 20,700
Bend GI 90 o (Knee) Dia 2" Buah 30,000 35,000 38,500 31,600 35,000 31,600
Bend GI 90 o (Knee) Dia 2½'' Buah 52,000 61,000 67,100 54,050 61,000 54,050
Bend GI 90 o (Knee) Dia 3" Buah 95,000 109,000 119,900 97,500 109,000 97,500
Bend GI 90 o (Knee) Dia 4" Buah 160,000 184,000 202,400 164,800 184,000 164,800
Bend GI 90 o (Knee) Dia 6" Buah 582,000 669,000 735,900 598,950 669,000 598,950
4 Dop GI (Drat Dalam) -
Dop GI (Drat Dalam) Dia ½" Buah 4,000 4,800 5,280 4,400 4,800 4,400
Dop GI (Drat Dalam) Dia ¾" Buah 5,000 5,400 5,940 4,950 5,400 4,950
Dop GI (Drat Dalam) Dia 1" Buah 13,000 15,500 17,050 13,900 15,500 13,900
Dop GI (Drat Dalam) Dia 1½" Buah 21,000 25,000 27,500 22,150 25,000 22,150
Dop GI (Drat Dalam) Dia 2" Buah 28,000 32,500 35,750 29,150 32,500 29,150
Dop GI (Drat Dalam) Dia 2½'' Buah 40,000 46,000 50,600 41,250 46,000 41,250
Dop GI (Drat Dalam) Dia 3" Buah 55,000 63,000 69,300 56,250 63,000 56,250
Dop GI (Drat Dalam) Dia 4" Buah 84,000 97,000 106,700 86,900 97,000 86,900
Dop GI (Drat Dalam) Dia 6" Buah 291,000 335,000 368,500 299,550 335,000 299,550
5 Dop GI (Drat Luar) -
Dop GI (Drat Luar) Dia ½" Buah 4,000 5,000 5,500 4,650 5,000 4,650
Dop GI (Drat Luar) Dia ¾" Buah 6,000 7,000 7,700 6,500 7,000 6,500
Dop GI (Drat Luar) Dia 1" Buah 9,000 10,000 11,000 9,050 10,000 9,050
Dop GI (Drat Luar) Dia 1½" Buah 15,000 17,000 18,700 15,100 17,000 15,100
Dop GI (Drat Luar) Dia 2" Buah 22,000 25,000 27,500 22,550 25,000 22,550
Dop GI (Drat Luar) Dia 2½'' Buah 29,000 33,500 36,850 30,050 33,500 30,050
Dop GI (Drat Luar) Dia 3" Buah 65,000 75,000 82,500 67,450 75,000 67,450
Dop GI (Drat Luar) Dia 4" Buah 94,000 108,600 119,460 97,500 108,600 97,500
Dop GI (Drat Luar) Dia 6" Buah 276,000 318,000 349,800 284,600 318,000 284,600
6 Tee GI -
Tee GI Dia ½" Buah 7,000 8,500 9,350 7,600 8,500 7,600
Tee GI Dia ¾" Buah 11,000 12,500 13,750 11,350 12,500 11,350
Tee GI Dia 1" Buah 16,000 18,000 19,800 16,400 18,000 16,400
Tee GI Dia 1½" Buah 29,000 33,500 36,850 30,050 33,500 30,050
Tee GI Dia 2" Buah 44,000 51,000 56,100 45,100 51,000 45,100
Tee GI Dia 2½'' Buah 102,000 117,000 128,700 104,850 117,000 104,850
Tee GI Dia 3" Buah 124,000 142,000 156,200 127,400 142,000 127,400
Tee GI Dia 4" Buah 218,000 250,500 275,550 224,650 250,500 224,650
Tee GI Dia 6" Buah 727,000 836,500 920,150 748,700 836,500 748,700
7 Gate Valve -
Gate Valve Dia 2" Buah 793,000 912,000 1,003,200 816,100 912,000 816,100
Gate Valve Dia 2½'' Buah 847,000 975,000 1,072,500 871,900 975,000 871,900
Gate Valve Dia 3" Buah 1,140,000 1,311,500 1,442,650 1,173,500 1,311,500 1,173,500
Gate Valve Dia 4" Buah 1,427,000 1,641,000 1,805,100 1,468,650 1,641,000 1,468,650
Gate Valve Dia 6" Buah 2,662,000 3,061,000 3,367,100 2,739,350 3,061,000 2,739,350
Gate Valve Dia 8" Buah 3,637,000 4,182,500 4,600,750 3,742,900 4,182,500 3,742,900
Gate Valve Dia 10" Buah 8,729,000 10,038,000 11,041,800 8,982,950 10,038,000 8,982,950
Gate Valve Dia 12" Buah 13,093,000 15,057,000 16,562,700 13,474,350 15,057,000 13,474,350
Gate Valve Dia 14" Buah 21,070,000 24,230,500 26,653,550 21,683,650 24,230,500 21,683,650
Gate Valve Dia 16" Buah 25,459,000 29,277,500 32,205,250 26,500,050 29,277,500 26,500,050
8 Gibolt joint PVC -
Gibolt joint PVC Dia 2" Buah 182,000 209,500 230,450 187,250 209,500 187,250
Gibolt joint PVC Dia 2½'' Buah 194,000 223,500 245,850 199,650 223,500 199,650
Gibolt joint PVC Dia 3" Buah 203,000 233,500 256,850 209,250 233,500 209,250
Gibolt joint PVC Dia 4" Buah 255,000 293,000 322,300 262,050 293,000 262,050
Gibolt joint PVC Dia 6" Buah 400,000 459,500 505,450 411,750 459,500 411,750
Gibolt joint PVC Dia 8" Buah 655,000 753,000 828,300 673,750 753,000 673,750
Gibolt joint PVC Dia 10" Buah 946,000 1,087,500 1,196,250 973,200 1,087,500 973,200
Gibolt joint PVC Dia 12" Buah 1,164,000 1,338,500 1,472,350 1,197,800 1,338,500 1,197,800
Gibolt joint PVC Dia 14" Buah 1,382,000 1,589,500 1,748,450 1,422,300 1,589,500 1,422,300
Gibolt joint PVC Dia 16" Buah 2,037,000 2,342,500 2,576,750 2,096,050 2,342,500 2,096,050
9 Clamp Sadle -
Clamp Sadle Dia 2½'' Buah 51,000 58,500 64,350 82,500 58,500 82,500
Clamp Sadle Dia 3" Buah 73,000 83,500 91,850 74,700 83,500 74,700
Clamp Sadle Dia 4" Buah 104,000 119,500 131,450 107,150 119,500 107,150
Clamp Sadle Dia 6" Buah 160,000 184,000 202,400 164,800 184,000 164,800
10 Bend PVC 90o ( knee ) -
Bend PVC 90o ( knee ) Dia ½" Buah 3,000 4,000 4,400 3,100 4,000 3,100
Bend PVC 90o ( knee ) Dia ¾" Buah 5,000 6,000 6,600 5,300 6,000 5,300
Bend PVC 90o ( knee ) Dia 1" Buah 9,000 10,000 11,000 9,050 10,000 9,050
Bend PVC 90o ( knee ) Dia 1½" Buah 22,000 25,500 28,050 22,550 25,500 22,550
Bend PVC 90o ( knee ) Dia 2" Buah 51,000 58,500 64,350 52,500 58,500 52,500
Bend PVC 90o ( knee ) Dia 2½'' Buah 62,000 71,500 78,650 63,700 71,500 63,700
Bend PVC 90o ( knee ) Dia 3" Buah 73,000 83,500 91,850 74,950 83,500 74,950
Bend PVC 90o ( knee ) Dia 4" Buah 117,000 135,000 148,500 120,150 135,000 120,150
Bend PVC 90o ( knee ) Dia 6" Buah 298,000 343,000 377,300 306,900 343,000 306,900
11 Long Bend PVC 90o -
Long Bend PVC 90o Long Bend PVC 90o Dia 2" Buah 124,000 142,500 156,750 127,400 142,500 127,400
Long Bend PVC 90o Long Bend PVC 90o Dia 2½'' Buah 157,000 180,500 198,550 161,950 180,500 161,950
Long Bend PVC 90o Long Bend PVC 90o Dia 3" Buah 182,000 209,500 230,450 187,250 209,500 187,250
Long Bend PVC 90o Long Bend PVC 90o Dia 4" Buah 291,000 334,500 367,950 299,550 334,500 299,550
Long Bend PVC 90o Long Bend PVC 90o Dia 6" Buah 509,000 585,500 644,045 524,150 585,500 524,150
Long Bend PVC 90o Long Bend PVC 90o Dia 8" Buah 837,000 963,000 1,059,300 861,300 963,000 861,300
Long Bend PVC 90o Long Bend PVC 90o Dia 10" Buah 1,447,000 1,663,500 1,829,850 1,488,850 1,663,500 1,488,850
Long Bend PVC 90o Long Bend PVC 90o Dia 12" Buah 2,400,000 2,750,500 3,025,550 2,470,200 2,750,500 2,470,200
Long Bend PVC 90o Long Bend PVC 90o Dia 14" Buah 6,000,000 6,901,000 7,591,100 6,175,750 6,901,000 6,175,750
Long Bend PVC 90o Long Bend PVC 90o Dia 16" Buah 8,668,000 9,968,500 10,965,350 8,920,600 9,968,500 8,920,600
12 Tee PVC -
Tee PVC Dia 1" Buah 4,000 5,500 6,050 4,650 5,500 4,650
Tee PVC Dia 1½" Buah 14,000 16,500 18,150 14,750 16,500 14,750
Tee PVC Dia 2" Buah 90,000 103,000 113,300 92,200 103,000 92,200
Tee PVC Dia 3" Buah 171,000 196,400 216,040 17,600 196,400 17,600
Tee PVC Dia 4" Buah 246,000 283,500 311,850 253,550 283,500 253,550
Tee PVC Dia 6" Buah 395,000 454,000 499,400 406,150 454,000 406,150
13 Reducer tee all socket PVC -
Reducer tee all socket PVC Dia 1" x ¾ " Buah 5,000 5,800 6,380 5,300 5,800 5,300
Reducer tee all socket PVC Dia 1½" x 1" Buah 29,000 33,500 36,850 30,050 33,500 30,050
Reducer tee all socket PVC Dia 1½" x ¾ " Buah 29,000 33,500 36,850 30,050 33,500 30,050
Reducer tee all socket PVC Dia 2" x 1" Buah 100,000 115,000 126,500 103,000 115,000 103,000
Reducer tee all socket PVC Dia 2" x ¾" Buah 100,000 115,000 126,500 103,000 115,000 103,000
Reducer tee all socket PVC Dia 3" x ½" Buah 193,000 221,900 244,090 199,100 221,900 199,100
Reducer tee all socket PVC Dia 3" x 2" Buah 169,000 194,300 213,730 174,500 194,300 174,500
Reducer tee all socket PVC Dia 4" x 1" Buah 280,000 322,000 354,200 288,350 322,000 288,350
Reducer tee all socket PVC Dia 4" x 2" Buah 287,000 330,000 363,000 295,900 330,000 295,900
Reducer tee all socket PVC Dia 4" x 3" Buah 299,000 343,800 378,180 307,900 343,800 307,900
Reducer tee all socket PVC Dia 6" x 2" Buah 452,000 519,800 571,780 465,300 519,800 465,300
Reducer tee all socket PVC Dia 6" x 3" Buah 513,000 589,900 648,890 528,450 589,900 528,450
Reducer tee all socket PVC Dia 6" x 4" Buah 573,000 658,900 724,790 590,150 658,900 590,150
14 Reducer socket PVC -
Reducer socket PVC Dia 1" x ¾ " Buah 7,000 8,000 8,800 7,600 8,000 7,600
Reducer socket PVC Dia 1½" x 1" Buah 29,000 33,300 36,630 30,050 33,300 30,050
Reducer socket PVC Dia 1½" x ¾ " Buah 29,000 33,300 36,630 30,050 33,300 30,050
Reducer socket PVC Dia 2" x 1" Buah 55,000 63,200 69,520 57,000 63,200 57,000
Reducer socket PVC Dia 2" x 1 ½" Buah 55,000 63,200 69,520 57,000 63,200 57,000
Reducer socket PVC Dia 2½" x 1 ½" Buah 109,000 125,300 137,830 112,650 125,300 112,650
Reducer socket PVC Dia 2½" x 2" Buah 109,000 125,300 137,830 112,650 125,300 112,650
Reducer socket PVC Dia 3" x 2" Buah 118,000 135,700 149,270 121,250 135,700 121,250
Reducer socket PVC Dia 3" x 2½" Buah 143,000 164,400 180,840 147,300 164,400 147,300
Reducer socket PVC Dia 4" x 2" Buah 131,000 150,600 165,660 134,900 150,600 134,900
Reducer socket PVC Dia 4" x 2½" Buah 169,000 194,300 213,730 173,600 194,300 173,600
Reducer socket PVC Dia 4" x 3" Buah 177,000 203,500 223,850 181,950 203,500 181,950
Reducer socket PVC Dia 6" x 3" Buah 360,000 414,000 455,400 370,950 414,000 370,950
Reducer socket PVC Dia 6" x 4" Buah 323,000 371,400 408,540 332,000 371,400 332,000
15 End Cop ( dop PVC ) -
End Cop ( dop PVC ) Dia ½" Buah 3,000 3,400 3,740 3,200 3,400 3,200
End Cop ( dop PVC ) Dia ¾" Buah 5,000 5,700 6,270 5,500 5,700 5,500
End Cop ( dop PVC ) Dia 1" Buah 8,000 9,200 10,120 7,950 9,200 7,950
End Cop ( dop PVC ) Dia 1½" Buah 19,000 21,800 23,980 19,700 21,800 19,700
End Cop ( dop PVC ) Dia 2" Buah 22,000 25,300 27,830 22,700 25,300 22,700
End Cop ( dop PVC ) Dia 2½'' Buah 22,000 25,300 27,830 22,700 25,300 22,700
End Cop ( dop PVC ) Dia 3" Buah 61,000 70,100 77,110 62,500 70,100 62,500
End Cop ( dop PVC ) Dia 4" Buah 91,000 104,600 115,060 93,750 104,600 93,750
End Cop ( dop PVC ) Dia 6" Buah 152,000 174,800 192,280 156,100 174,800 156,100
16 Single air valve ( ventil ) -
Single air valve ( ventil ) Dia ½" Buah 250,000 287,500 316,250 257,400 287,500 257,400
Single air valve ( ventil ) Dia ¾" Buah 303,000 348,400 383,240 312,000 348,400 312,000
Single air valve ( ventil ) Dia 1" Buah 417,000 479,500 527,500 429,000 479,500 429,000
Single air valve ( ventil ) Dia 2" Buah 733,000 842,900 927,190 754,350 842,900 754,350
Single air valve ( ventil ) Dia 3" Buah 141,000 162,100 1,783,100 1,455,500 162,100 1,455,500
Single air valve ( ventil ) Dia 4" Buah 1,547,000 1,779,000 1,956,900 1,592,150 1,779,000 1,592,150
17 Kunci Pipa -
Kunci Pipa Dia 2" x ½ " Buah 131,000 150,600 165,660 134,900 150,600 134,900
Kunci Pipa Dia 3" x ½ " Buah 175,000 201,200 221,320 179,750 201,200 179,750
Kunci Pipa Dia 4" x ½ " Buah 344,000 395,600 435,160 354,450 395,600 354,450
Kunci Pipa Dia 6" x ½ " Buah 655,000 753,200 828,520 673,750 753,200 673,750
18 Mata gergaji besi Buah 105,000 120,700 132,770 108,350 120,700 108,350
19 Stang gergaji besi Buah 44,000 50,600 55,660 15,100 50,600 55,660
20 Betel besar Buah 26,000 29,900 32,890 27,100 29,900 27,100
21 Betel kecil Buah 13,000 14,900 16,390 13,550 14,900 13,550

I.7.1.10. Bahan Kaca

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Kaca Polos 3 mm m² 99,000 113,800 125,180 103,650 103,650 103,650


2 Kaca Polos 5 mm m² 133,000 152,900 168,190 129,500 129,500 129,500
3 Kaca Riben Tebal 3 mm m² 121,000 139,100 153,010 99,700 99,700 99,700
4 Kaca Riben Tebal 5 mm m² 172,000 197,800 217,580 165,900 165,900 165,900
5 Glass Blok buah 148,500 170,700 187,770 35,350 35,350 35,350
6 Kerangka Nako 5 mm m² 93,000 106,900 117,590 100,100 100,000 100,100
7 Kerangka Es 3 mm m² 111,000 127,600 140,360 105,950 105,950 105,950

I.7.1.11. Bahan Finishing

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Ampelas lembar 5,500 6,300 6,930 4,400 4,400 4,400


2 Plamir Kayu kg 38,500 44,200 48,620 28,500 22,250 28,500
3 Spiritus liter 82,500 94,800 104,280 15,850 15,850 15,850
4 Minyak Cat liter 38,500 44,200 48,620 11,800 11,800 11,800
5 Residu liter 17,000 19,500 21,450 17,300 17,300 17,300
6 Teak Oil liter 44,000 50,600 55,660 40,500 40,500 40,500
7 Melamin lembar 98,000 112,700 123,970 123,650 91,000 123,650
8 Aluminium Pintu Kamar mandi lembar 129,000 148,300 163,130 123,650 123,650 123,650
9 Meni Besi kg 35,000 40,200 44,220 32,250 32,250 32,250
10 Meni Kayu kg 30,000 34,500 37,950 28,050 28,050 28,050
11 Cat Kayu Mutu Menengah kg 64,000 73,600 80,960 59,400 59,400 59,400
12 Cat Kayu Mutu Tinggi kg 87,000 100,000 110,000 89,000 89,000 89,000
13 Cat Tembok Mutu menengah Kg 39,000 44,800 49,280 65,900 44,800 65,900
14 Cat Tembok Mutu Tinggi kg/ kaleng 99,000 113,800 125,180 111,550 111,550 111,550
15 Cat Besi kg 93,000 106,900 117,590 38,200 38,200 38,200
16 Plamir Tembok kg 10,000 11,500 12,650 10,700 10,700 10,700
17 Teer liter 8,000 9,200 10,120 7,600 7,600 7,600
18 Politur liter 68,000 78,200 86,020 63,150 63,150 63,150
19 Cat Marka Jalan Scalato kg 91,000 104,600 115,050 92,750 92,750 92,750
20 Minyak Cat A Special liter 50,000 57,500 63,250 46,450 46,450 46,450
21 Aqua Proff kg 62,000 71,300 78,430 63,150 63,150 63,150
22 Cat Marka Jalan Biasa kg 74,000 85,100 93,610 75,500 75,500 75,500
23 Cairan Pengupas Cat kg 220,000 253,000 278,300 224,550 224,550 224,550
24 Cairan Pengeras Cat (Hardner) kg 203,000 233,400 256,740 206,800 206,800 206,800
25 Kuas cat bh 10,100 11,110 11,150 10,100 11,150

I.7.1.12. Bahan Pengunci

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Kunci pintu mutu menengah buah 131,000 150,650 165,715 123,000 123,000 123,000
2 Kunci pintu mutu Tinggi buah 385,000 442,750 487,025 346,500 346,500 346,500
3 Yale Kecil buah 65,000 74,750 82,225 67,100 74,750 67,100
4 Yale Besar buah 118,000 135,700 149,270 121,000 135,700 121,000
5 Kuda Terbang Kecil buah 74,000 85,100 93,610 68,900 85,100 68,900
6 Kuda Terbang Besar buah 92,000 105,800 116,380 85,700 105,800 85,700
7 Royal stel 56,000 64,400 70,840 57,450 64,400 57,450
8 Haag Angin Besar stel 27,000 31,050 34,155 7,850 6,300 7,850
9 Haag Angin Kecil stel 11,000 12,650 13,915 6,300 7,850 6,300
10 Grendel Besar buah 27,000 31,050 34,155 14,300 11,000 14,300
11 Grendel Kecil buah 11,000 12,650 13,915 11,000 14,300 11,000
12 Engsel Nylon ps 38,000 43,700 48,125 16,100 16,100 16,100
13 Engsel biasa ps 10,000 11,500 12,650 10,800 8,500 10,800
14 Expagnolet buah 63,000 72,450 79,695 65,150 66,150 65,150
15 Kunci pintu silinder BH 49,500 50,000 49,500
16 Engsel angin BH 15,000 16,500
17 Kunci pintu kamar mandi bh 150,650 165,715

I.7.1.13. Bahan Sanitaire

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Closet Duduk (kwalitas no. 1) buah 4,500,000 5,175,000 5,692,500 3,022,600 3,022,600 3,022,600
2 Closet Jongkok Teraso buah 82,000 94,300 103,730 84,500 84,500 84,500
3 Closet Jongkok Porselin buah 192,000 220,800 242,880 197,800 197,800 197,800
4 Wastafel + Acecories (kualitas no. 1) buah 1,836,000 2,111,400 2,322,540 2,111,400 2,322,540
5 Urinoir Porselin (kualitas no. 1) buah 2,142,000 2,463,300 2,709,630 2,204,000 2,204,000 2,204,000
6 Saringan Air Besi Stainless buah 229,000 263,350 289,300 259,200 259,200 259,200
7 Saringan air besi buah 68,550 78,833 86,713 70,650 70,650 70,650
8 Saringan Air Plastik buah 18,400 21,160 23,210 19,050 19,050 19,050
9 Bak Cuci Piring Teraso buah 262,000 301,300 331,100 296,150 296,150 296,150
10 Bak Cuci Piring Logam buah 428,000 492,200 541,200 440,900 440,900 440,900
11 Reservoir Fybg.Kapasitas 1 M3 buah 3,366,000 3,870,900 4,257,000 3,463,350 3,808,799
12 Septictank Kapasitas 1 M3 buah 4,162,000 4,786,300 5,254,600 4,710,200 4,710,200 4,710,200
13 Septictank Kapasitas 2 M3 buah 5,508,000 6,334,200 6,967,400 6,234,050 6,234,050 6,234,050
14 Bak Fyberglass Kap 0.5 M3 buah 928,000 1,067,200 1,173,700 944,600 1,038,865
15 Bak Mandi Plastik Kap 0.5 M3 buah 3,338,000 3,838,700 4,221,800 440,900 440,900 440,900
16 Bak Mandi Teraso 50 x 50 cm buah 312,000 358,800 393,800 388,000 358,800 388,000
17 Tangki Air Fiberglass 1 000 Lt. Vertikal Buah 5,264,000 6,053,600 6,658,300 5,956,950 5,956,950 5,956,950
18 Tangki Air Fiberglass 2 000 Lt. Vertikal Buah 7,957,000 9,150,550 10,065,000 9,004,750 9,004,750 9,004,750
19 Tangki Air Fiberglass 3 000 Lt. Vertikal Buah 10,527,000 12,106,050 13,316,600 11,913,900 11,913,900 11,913,900
20 Tangki Air Fiberglass 4 000 Lt. Vertikal Buah 15,179,000 17,455,850 19,200,500 17,178,150 17,178,150 17,178,150
21 Tangki Air Fiberglass 5 000 Lt. Vertikal Buah 21,054,000 24,212,100 26,633,200 23,827,800 24,212,100 23,827,800
22 Tangki Air Fiberglass 3 000 Lt. Horisontal Buah 29,990,000 34,488,500 37,936,800 33,940,650 33,940,650 33,940,650
23 Tangki Air Fiberglass 4 000 Lt. Horisontal Buah 42,231,000 48,565,650 53,421,500 47,793,900 47,793,900 47,793,900
24 Tangki Air Fiberglass 5 000 Lt. Horisontal Buah 50,065,000 57,574,750 63,331,400 56,660,050 57,574,750 56,660,050
25 Tangki Air Fiberglass 6 000 Lt. Horisontal Buah 57,838,000 66,513,700 73,165,070 65,456,950 66,513,700 65,456,950
26 Sealtape buah 3,300 3,630 3,650 3,300 3,630

I.7.1.14. Bahan Paku

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Paku Panjang 1-3 Cm kg 25,000 28,750 31,625 24,100 19,280 24,100


2 Paku Panjang 4-6 Cm kg 24,000 27,600 30,360 23,000 17,800 23,000
3 Paku 5-12cm kg 23,000 26,450 29,095 21,250 17,000 21,250
4 Paku Usuk kg 24,000 27,600 30,360 24,650 19,400 24,650
5 Paku Reng kg 27,000 31,050 34,155 27,850 27,120 27,850
6 Paku Eternit kg 36,000 41,400 45,540 33,900 27,120 33,900
7 Paku Seng kg 32,000 36,800 40,480 30,050 22,280 30,050
8 Paku Asbes kg 31,000 35,650 39,215 23,680 26,048
9 Skrup / Piles 1.5 Cm. Doos Kecil 11,000 12,650 13,915 10,250 12,650 10,250
10 Skrup / Piles 2.0 Cm. Doos Kecil 13,000 14,950 16,445 12,550 14,950 12,550
11 Paku Sumbat kg 31,000 35,650 39,215 35,650 39,215
12 Besi Beugel/Baut (utk kuda-kuda) kg 35,000 40,250 44,275 25,440 27,984
13 Paku sekrup kg 22,500 24,750 24,750 22,500 24,750

I.7.1.15. Bahan Instalasi Listrik

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Titik Lampu buah 129,000 148,350 163,185 294,250 148,350 163,185


2 Stop Kontak Tanam buah 118,000 135,700 149,270 235,400 135,700 149,270
3 Stop Kontak Luar buah 130,000 149,500 164,450 223,650 149,500 164,450
4 Saklar buah 25,000 28,750 31,625 29,500 28,750 29,500
5 Zekering Box 1 Group buah 294,000 338,100 371,910 317,800 254,240 317,800
6 Zekering Box 2 Group buah 383,000 440,450 484,495 411,950 329,560 411,950
7 Zekering Box 3 Group buah 471,000 541,650 595,215 506,150 404,920 506,150
8 Saklar ganda buah 26,800 29,700 27,000 29,700
Lampu pijar 25 watt buah 5,700 6,270 5,700 6,270
Lampu Down light buah 142,560 156,816
Lampu TL panjang (Neon Box) 1 x 24 Watt buah 101,860 112,046
Lampu TL Tornado 24 watt buah 60,000 66,000

7. 1.16. Bahan Tambahan

NO. URAIAN SATUAN HARGA (Rp) HARGA (Rp) HARGA (Rp)

1 Kayu Bakar m³ 180,000 207,000 227,700 207,000 227,700


2 Olie SAE 30 liter 30,000 34,500 37,400 34,500 37,400
3 Olie SAE 40 liter 30,000 34,500 37,400 34,500 37,400
4 Olie SAE 90 liter 40,000 46,000 50,600 46,000 50,600
5 Olie SAE 100 liter 47,000 54,050 59,400 54,050 59,400
6 Olie merk mesran liter 43,000 49,450 53,900 49,450 53,900
7 Olie merk top one liter 51,000 58,650 63,800 58,650 63,800
8 Olie merk penzoil liter 49,000 56,350 61,600 56,350 61,600
9 Flux Oil liter 7,000 8,050 8,800 8,050 8,800
10 Sambungan Rumah 1/2" Set 1,109,000 1,275,350 1,402,500 1,275,350 1,402,500
11 Sambungan Rumah 3/4" Set 1,552,000 1,784,800 1,962,400 1,784,800 1,962,400
12 Sambungan Rumah 1" Set 2,139,000 2,459,850 2,704,900 2,459,850 2,704,900
13 Bentonite Zak 315,000 362,250 398,200 362,250 398,200
14 Minyak Begisting liter 15,000 16,500 15,000 16,500
15 Rangka baja ringan c.75 m2 275,000 145,000 176,000
16 Rangka baja ringan c.85 m2 302,500 150,000 183,000
17 Rangka baja ringan c.100 m2 332,750 160,000 195,200
18 Listplank m 44,000 40,000 44,000
19 pagar besi hollow m2 495,000 450,000 495,000
20 rangka plafond hollow puring m2 66,000 60,000 66,000
21 pipa PVC 1/2" m 6,490 5,900 6,490
22 pipa PVC 1" m 12,980 11,800 12,980
23 pipa PVC 1 1/2" m 19,470 17,700 19,470
24 pipa PVC 2" m 25,960 23,600 25,960
25 kusen allumunium brown (warna) m 66,000 176,550 60,000 66,000
26 kusen allumunium silver m 55,000 164,800 50,000 55,000
27 Patok Kayu bh 10,000 11,000
28 tali ijuk m3 1,029 1,132
29 asbes semen (eternit) m2 27,778 30,556
30 akustik lbr 152,600 61,200 67,320
31 papan gypsum lbr 120,150 57,000 62,700
32 tepung gypsum kg 4,000 4,400
33 besi hollow 50.50.3 kg -
34 besi hollow m 9,147 10,061
35 panel beton pracetak lbr 95,000 104,500
36 kolom beton pracetak btg 190,000 209,000
37 Kaca buram Tebal 12 mm m² 290,000 319,000
38 Kaca cermin Tebal 5 mm m² 125,000 137,500
39 sealant kg 141,000 155,100
40 kawat jaring lbr 65,000 71,500
41 ramset BH 16,500 240 264
42 Air ltr 200 50 55
43 Batu koral sikat m2 64,000 70,400
44 batu templek/batu lempeng M2 69,300 76,230
45 Batu candi m2 237,350 261,085
46 Batu Andesit M2 186,850 205,535
47 ubin granit m2 143,500 157,850
48 Batu Granit kg 11,400 12,540
49 Batu paras m2 100,000 110,000
50 teralux kerang m2 206,000 226,600
51 internal cove m2 22,700 24,970
52 karpet m2 90,000 99,000
53 underlayer m2 101,000 111,100
54 parquet m2 210,000 231,000
55 gymfloor m2 131,000 144,100
56 vynil m2 120,000 132,000
57 wallpaper m2 55,000 30,000 33,000
58 floor hardener kg 19,800 9,000 9,900
59 Cairan Pengencer ltr 30,000 33,000
60 allumunium profil T m' 55,000 60,500
61 vernis kg 33,000 36,300
62 dempul kg 35,000 38,500
63 kalkarium/mill kg 1,200 1,320
64 strorox-100 kg 36,300 36,300
65 Waterstop lebar 150mm M 31,600 31,600
66 Waterstop lebar 200mm M 28,050 28,050
67 Waterstop lebar 230mm-320mm M 31,600 31,600
68 jaring kawat baja dilas kg 21,250 21,250
69 Penjaga jarak bekisting/spacer bh
70 phenol film 12mm lbr
71 dinabolt dia 12mm (10-15cm) bh
72 besi baja iwf kg 22,250
solar liter
kawat las kg 38,950

II. 9. ALAT - ALAT KELISTRIKAN

NO. URAIAN SATUAN HARGA (RP) HARGA (RP) HARGA (RP)

1 AVO Meter SANWAY X 360 TRF Set 606,700 667,370 606,700 667,370
2 Ballast 10 watt /220 volt buah 38,500 42,350 38,500 42,350
Ballast 15 watt / 220 volt buah 40,500 44,550 40,500 44,550
Ballast 20 watt / 220 volt buah 45,200 49,720 45,200 49,720
Ballast 40 watt /220 volt buah 51,300 56,430 51,300 56,430
3 Bola Lampu - -
Neon bundar Ukuran 20 Watt Ciyoba buah 37,100 40,810 37,100 40,810
Neon bundar Ukuran 30 Watt Ciyoba buah 40,500 44,550 40,500 44,550
Neon bundar Ukuran 32 Watt Ciyoba buah 27,000 29,700 27,000 29,700
- -
Neon Lurus Ukuran 10 Watt Philips buah 8,700 9,570 8,700 9,570
Neon Lurus Ukuran 20 Watt buah 13,500 14,850 13,500 14,850
Neon Lurus Ukuran 40 Watt buah 18,000 19,800 18,000 19,800
- -
Bola Lampu Warna Ukuran G 12/5 Watt buah 5,400 5,940 5,400 5,940
Bola Lampu Warna Ukuran G 212/5 Watt buah 4,500 4,950 4,500 4,950
- -
Bola Lampu Warna otomatis Ukuran G 12/5 Watt buah 28,300 31,130 28,300 31,130
4 Bel listrik bateray buah 40,500 44,550 40,500 44,550
5 Baterai Alkaline AAA set 15,000 16,500 15,000 16,500
Baterai ABC Besar buah 4,300 4,730 4,300 4,730
Baterai ABC Sedang buah 2,900 3,190 2,900 3,190
Baterai Energizer Recargeable 2000 2xAAmAh set 134,900 148,390 134,900 148,390
6 Bingkai Lampu / Promosi Multimedia (Bahan Media buah 7,538,740
Promosi) Uk. 1 x 2,5 m; Materi / Display : Vinyl; 6,853,400 7,538,740 6,853,400
Rangka : Besi + Plate Besi + Neon -

7 Controler traffic light ASP SMP EL 02 set 35,952,000 39,547,200 35,952,000 39,547,200
8 Lampu Lalu Lintas Aspek x 30 cm 3 Pabrikasi set 4,213,200 4,634,520 4,213,200 4,634,520
Lampu Lalu Lintas Aspek x 20 cm 3 Pabrikasi set 3,089,700 3,398,670 3,089,700 3,398,670
Lampu Lalu Lintas Aspek x 20 cm 2 Pabrikasi set 2,471,700 2,718,870 2,471,700 2,718,870
9 Cok T Arde Broco buah 24,700 27,170 24,700 27,170
10 Cok Arde Broco buah 13,000 14,300 13,000 14,300
11 Cok Roll Merk Royal 10 M buah 40,500 44,550 40,500 44,550
Cok Roll buah 85,000 93,500 85,000 93,500
Cok Roll Cok Roll 10 m rol 12,500 13,750 12,500 13,750
12 Dop Bundar 20 Watt - 220 Volt buah 67,500 74,250 67,500 74,250
13 Elemen sterika biasa batang 18,600 20,460 18,600 20,460
14 Elemen 200 watt batang 121,400 133,540 121,400 133,540
15 Fitting lampu no.210 merk BROCO buah 10,600 11,660 10,600 11,660
Fiting merk BROCO buah 12,000 13,200 12,000 13,200
Fiting Tempel merk BROCO buah 45,000 49,500 45,000 49,500
Fitting gantung no.216 merk BROCO buah 6,800 7,480 6,800 7,480
Fitting Gop no.216 merk BROCO buah 13,500 14,850 13,500 14,850
Fitting plapon miring no.220 merk BROCO buah 10,600 11,660 10,600 11,660
fitting kombinasi no.226 merk BROCO buah 10,100 11,110 10,100 11,110
fitting amatir 40 w no.5040 merk BROCO buah 23,500 25,850 23,500 25,850
fitting amatir 60 w no.5060 merk BROCO buah 39,300 43,230 39,300 43,230
fitting amatir 100 wno.5106 merk BROCO buah 39,300 43,230 39,300 43,230
16 Fusse Rok - Fusse Bok I grup no.711 Baraco buah 28,000 30,800 28,000 30,800
Fusse Rok - Fusse Bok II Grup no.712 buah 47,200 51,920 47,200 51,920
Fusse Rok - Fusse Bok III Grup no.713 buah 106,200 116,820 106,200 116,820
17 Fitting Lampu Otomatis Freecon buah 12,000 13,200 12,000 13,200
18 Fitting Putih Keramik RRT buah 7,800 8,580 7,800 8,580
19 F i s e r - Uk. 6",8",10" dan 12" kotak 11,800 12,980 11,800 12,980
F i s e r - Uk. 6",8",10" dan 12" kotak 15,100 16,610 15,100 16,610
F i s e r - Uk. 6",8",10" dan 12" kotak 18,600 20,460 18,600 20,460
20 Genset Merk Honda Type SH 7000 output set 33,705,000 37,075,500 33,705,000 37,075,500
Genset Merk Honda,Model SW 2900 Dx Type buah 9,437,400 10,381,140 9,437,400 10,381,140
Genset Sel-Exceting 2-Pole Rotating Type - -
Genset Merk Honda 5000 watt + dudukan unit 6,538,800 7,192,680 6,538,800 7,192,680
Genset Rakitan merk Honda, Mesin Mobil Toyota
Diesel,rangkaian mesin kopel, Jenis Dynamo Dennyo unit 53,928,000 59,320,800 53,928,000 59,320,800
15000 VA
genset Merk
Type Honda
: SH 7000 Deluxe Output : 6000-7000
Watt
Set 28,312,200 31,143,420 28,312,200 31,143,420
genset Type : SH 6000 Deluxe Output : 4400-6000
Watt Merk Cummins Type : 4.BT 390 G1 Capasity : Set 20,223,000 22,245,300 20,223,000 22,245,300
40 KVA Model : Open Type Merk PERKIN Type :
genset
4.236
Unit 174,142,500 191,556,750 174,142,500 191,556,750
genset Capasity : 40 KVA Unit 185,377,500 203,915,250 185,377,500 203,915,250
genset ATS / AMF (Automatic Transfer Swits) Set 60,669,000 66,735,900 60,669,000 66,735,900
21 Isolasi Plastik Unibell buah 33,800 37,180 33,800 37,180
22 Isolasi Kertas rol 13,500 14,850 13,500 14,850
23 Isolator - Ukuran RN II buah 2,900 3,190 2,900 3,190
Isolator - Ukuran RN III buah 8,200 9,020 8,200 9,020
24 Knop Bel - Bulat no.RRT buah 5,700 6,270 5,700 6,270
Knop Bel - Persegi no.natural buah 7,800 8,580 7,800 8,580
Pipa Kabel lonjor 13,000 14,300 13,000 14,300
25 Kabel - -
Kabel NYA Meter 6,000 6,600 6,000 6,600
Kabel NYA - Ukuran 1 1/2 mm (focus) 1 X 1,5 rol 168,600 185,460 168,600 185,460
Kabel NYA - Ukuran 2 1/2 mm (focus) 1X 2,5 rol 269,700 296,670 269,700 296,670
Kabel NYA - ukuran 2 x 1 1/2 mm NYM rol 881,900 970,090 881,900 970,090
Kabel NYA - ukuran 2 x 2 1/2 mm rol 1,235,900 1,359,490 1,235,900 1,359,490
Kabel NYA - Ukuran 2 x 4 mm rol 842,700 926,970 842,700 926,970
Kabel NYA - Ukuran 2 x 6 mm rol 1,011,200 1,112,320 1,011,200 1,112,320
Kabel NYA - Ukuran 2 x 10 mm rol 1,836,900 2,020,590 1,836,900 2,020,590
Kabel NYA - Ukuran 2 x 16 mm rol 185,300 203,830 185,300 203,830
Kabel NYA - Ukuran 3 x 2 1/2 mm rol 845,900 930,490 845,900 930,490
Kabel NYA - Ukuran 3 x 4 mm rol 2,247,000 2,471,700 2,247,000 2,471,700
- -
Kabel NYY - Ukuran 3 x 2 1/2 mm rol 2,078,500 2,286,350 2,078,500 2,286,350
Kabel NYY - Ukuran 3 x 4 mm rol 1,685,300 1,853,830 1,685,300 1,853,830
Kabel NYY - Ukuran 3 x 6 mm rol 1,966,200 2,162,820 1,966,200 2,162,820
Kabel NYY - Ukuran 3 x 10 mm rol 3,567,100 3,923,810 3,567,100 3,923,810
Kabel NYY - Ukuran 4 x 1 1/2 mm rol 870,700 957,770 870,700 957,770
Kabel NYY - Ukuran 4 x 2 1/2 mm rol 1,202,200 1,322,420 1,202,200 1,322,420
Kabel NYY - Ukuran 4 x 4 mm rol 2,134,700 2,348,170 2,134,700 2,348,170
Kabel NYY - Ukuran 4 x 6 mm rol 2,831,300 3,114,430 2,831,300 3,114,430
Kabel NYY - Ukuran 4 x 10 mm rol 4,381,700 4,819,870 4,381,700 4,819,870
Kabel NYY - Ukuran 4 x 16 mm SUPREM rol 8,898,200 9,788,020 8,898,200 9,788,020
- -
Kabel NYM Meter 14,000 15,400 14,000 15,400
Kabel NYM - Ukuran 2 x 1 1/2 mm rol 421,300 463,430 421,300 463,430
Kabel NYM - Ukuran 2 x 2 1/2 mm rol 596,500 656,150 596,500 656,150
Kabel NYM - Ukuran 2 x 4 mm rol 814,500 895,950 814,500 895,950
Kabel NYM - Ukuran 2 x 6 mm rol 1,370,700 1,507,770 1,370,700 1,507,770
Kabel NYM - Ukuran 2 x 10 mm rol 2,244,800 2,469,280 2,244,800 2,469,280
26 Kabel NYY Alm 2x1,5mm rol 1,095,400 1,204,940 1,095,400 1,204,940
27 Kabel Senur / NY2 CHD - Uk.2 x 2,5 mm 2 X 23 rol 949,400 1,044,340 949,400 1,044,340
28 Kabel NYMHY 2 X 2,5 mm rol 1,816,600 1,998,260 1,816,600 1,998,260
29 Kabel NYMHY 3x2,5mm rol 1,825,600 2,008,160 1,825,600 2,008,160
30 Kabel H (NY) 3 x 1,5 sqmm meter 11,800 12,980 11,800 12,980
Kabel H (NY) 2 x 0,75 sqmm meter 6,200 6,820 6,200 6,820
31 Kabel Telpon isi 2 rol 157,900 173,690 157,900 173,690
32 Klem Kabel - Uk.8,10"12" Imundex ktk 37,000 40,700 37,000 40,700
33 Kontaktor LS 57 A - 380 Volt buah 1,853,800 2,039,180 1,853,800 2,039,180
34 Kontraktor LS 4 A - 250 Volt buah 921,300 1,013,430 921,300 1,013,430
35 Kabel Box Telpon buah 25,800 28,380 25,800 28,380
Kom tanam buah 10,000 11,000 10,000 11,000
36 Lampu Philips - -
Lampu Philips Pijar (Gelas) 115/125- Balon Fhilip buah 60,000 66,000 60,000 66,000
Lampu Philips Pijar (Gelas) 115/125- Philip 30 Watt buah 30,000 33,000 30,000 33,000
Lampu Philips Pijar (Gelas) 115/125 - 5 Watt clear buah 3,400 3,740 3,400 3,740
Lampu Philips Pijar (Gelas) 115/125- 10 Watt clear buah 5,100 5,610 5,100 5,610
Lampu Philips Pijar - 15 Watt clear buah 5,100 5,610 5,100 5,610
Lampu pijar 25 watt buah 5,700 6,270 5,700 6,270
Lampu Philips Pijar (Gelas) 115/125- 40 Watt clear buah 5,700 6,270 5,700 6,270
Lampu Philips Pijar (Gelas) 115/125- 60 Watt clear buah 5,700 6,270 5,700 6,270
Lampu Philips Pijar (Gelas) 115/125- 75 Watt clear buah 6,100 6,710 6,100 6,710
Lampu Philips Pijar (Gelas) 115/125- 100 Watt clear buah 6,800 7,480 6,800 7,480
Lampu Philips Pijar (Gelas) 115/125- 250 Watt clear buah 13,500 14,850 13,500 14,850
Lampu Philips Pijar (Gelas) 115/125- 200 Watt clear buah 13,500 14,850 13,500 14,850
Lampu Philips Pijar (Gelas) 115/125- 25 Watt sofoone buah 6,100 6,710 6,100 6,710
Lampu Philips Pijar (Gelas) 115/125- 40 Watt septum buah 6,100 6,710 6,100 6,710
Lampu Philips Pijar (Gelas) 115/125- 60 Watt septum buah 6,800 7,480 6,800 7,480
Lampu Philips Pijar (Gelas) 115/125- 75 Watt septum buah 6,800 7,480 6,800 7,480
Lampu Philips Pijar (Gelas) 115/125- 100 Watt
septum
buah 7,800 8,580 7,800 8,580
Lampu Philips Pijar (Gelas) 115/125- 40 watt K.Super
Lux clear
buah 15,800 17,380 15,800 17,380
Lampu Philips Pijar (Gelas) 115/125- 60 watt K.Super
Lux clear
buah 13,000 14,300 13,000 14,300
Lampu Philips Pijar (Gelas) 115/125- 75 watt K.Super
Lux clear
buah 11,800 12,980 11,800 12,980
Lampu Philips Pijar (Gelas) 115/125- 100watt
K.Super Lux clear
buah 16,300 17,930 16,300 17,930
Lampu Philips Pijar (Gelas) 115/125- 15 watt k
(Gelas buram)
buah 14,100 15,510 14,100 15,510
Lampu Philips Pijar (Gelas) 115/125- 40 watt K
(Gelas buram)
buah 16,300 17,930 16,300 17,930
Lampu Philips Pijar (Gelas) 115/125- 75 watt K
(Gelas buram)
buah 16,900 18,590 16,900 18,590
Lampu Philips Pijar (Gelas) 115/125- 60 watt K
(Gelas buram)
buah 16,300 17,930 16,300 17,930
Lampu Philips Pijar (Gelas) 115/125- 180 watt K
(Gelas buram)
buah 16,900 18,590 16,900 18,590
* Lampu pijar hias 115/125V Chiyoda - -
Lampu pijar hias 115/125V Chiyoda 25 watt candle prosted
lampu lilin Clean
buah 7,600 8,360 7,600 8,360
Lampu pijar hias 115/125V Chiyoda 25 watt candle prosted
lampu lilin Clean
buah 4,100 4,510 4,100 4,510
Lampu pijar hias 115/125V Chiyoda 40 watt candle frosted
lampu lilin Clean
buah 9,000 9,900 9,000 9,900
Lampu pijar hias 115/125V Chiyoda 40 watt candle frosted
lampu lilin Clean
buah 4,000 4,400 4,000 4,400
* Lampu TL (Tubular Lamp) - -
Lampu TL 10 Watt TL ( Stater Warna putih sejuk) buah 27,900 30,690 27,900 30,690
Lampu TL 15 Watt TL ( Stater Warna putih sejuk) buah 33,700 37,070 33,700 37,070
Lampu TL 18 Watt TL ( Stater Warna putih sejuk) buah 20,800 22,880 20,800 22,880
Lampu TL 20 Watt TL ( Stater Warna putih sejuk) buah 41,600 45,760 41,600 45,760
Lampu TL 36 Watt TL ( Stater Warna putih sejuk) Buah 52,800 58,080 52,800 58,080
Lampu TL 40 Watt 220 Volt Sinar/Day light Set 111,300 122,430 111,300 122,430
Lampu TL 20 Watt 220 Volt Sinar/Day light Set 85,400 93,940 85,400 93,940
Lampu TL 40 Watt 220 Volt Day light Buah 30,900 33,990 30,900 33,990
Lampu TL 20 watt 220 Volt Philips Buah 27,600 30,360 27,600 30,360
lampu Hias Tiga Warna Set 125,000 137,500 125,000 137,500
37 Lampu sorot (sport Lingh ) - Ukuran 300 watt Tokip Buah 191,000 210,100 191,000 210,100
Lampu Sensor Merk Kenmaster, 220 - 240 V / 50 Hz
38
E 27 60 W Max
buah 73,500 80,850 73,500 80,850
39 Lampu 220 Volt- SL 18 W buah 129,700 142,670 129,700 142,670
Lampu 220 Volt- ML Mercury 160 W buah 146,100 160,710 146,100 160,710
Lampu 220 Volt- Pijar 100 Watt buah 16,900 18,590 16,900 18,590
Lampu 220 Volt- Pijar 40 Watt buah 11,300 12,430 11,300 12,430
Lampu 220 Volt- Pijar 5 Watt buah 7,900 8,690 7,900 8,690
Lampu 220 Volt- Pijar Cabe buah 8,500 9,350 8,500 9,350
Lampu Emergency- merk Hitachi 10 Watt HELES 20
40
W
buah 646,000 710,600 646,000 710,600
Lampu Emergency- merk Telena 10 watt DURALITF
20 W
buah 589,900 648,890 589,900 648,890
Lampu Emergency- merk Telena lengkap 10 Watt buah 764,000 840,400 764,000 840,400
41 Lampu Microskop kotak 320,200 352,220 320,200 352,220
42 Lampu oftotif buah 61,800 67,980 61,800 67,980
43 MCB 6A,10A,6A Merlin Gerin IP kotak 45,000 49,500 45,000 49,500
44 MCCB 32/60A Merlin Gerin buah 651,700 716,870 651,700 716,870
45 Saklar - -
Inbow merk Broco (Timbul) Saklar angkle no.6601 buah 21,400 23,540 21,400 23,540
Inbow merk Broco (Timbul) Saklar seri no.6612 buah 30,900 33,990 30,900 33,990
Inbow merk Broco (Timbul) Saklar angkle radium
No.6627
buah 36,000 39,600 36,000 39,600
Ofbow Merk Broco Out Bow (Tanam) - -
Ofbow Merk Broco Out Bow (Tanam) Saklar angkle
no.630
buah 23,500 25,850 23,500 25,850
Ofbow Merk Broco Out Bow (Tanam) Saklar seri
no.632
buah 31,100 34,210 31,100 34,210
Ofbow Merk Broco Out Bow (Tanam) Saklar engkle
persegi No.64 L1
buah 23,600 25,960 23,600 25,960
Ofbow Merk Broco Out Bow (Tanam) Sekelar Doubel
Tanam
buah 23,500 25,850 23,500 25,850
46 Stop Kontak - -
Stop kontak no.660 Apbour (3 Phase) buah 22,500 24,750 22,500 24,750
Stop kontak no.6230 Apbour (3 Phase) buah 24,000 26,400 24,000 26,400
- -
Stop kontak AC no.2130 Ipbour (3 Phase) buah 125,000 137,500 125,000 137,500
Stop kontak no.6600 Ipbour (3 Phase) buah 20,300 22,330 20,300 22,330
Stop kontak orde no.6100 Ipbour (3 Phase) buah 65,200 71,720 65,200 71,720
Stop kontak orde tutup No.6120 Ipbour (3 Phase) buah 64,600 71,060 64,600 71,060
- -
steker aparat no.313 Puter Steke buah 5,600 6,160 5,600 6,160
kontak steker no.334 Puter Steke buah 5,700 6,270 5,700 6,270
steker biasa no.334 Puter Steke buah 3,400 3,740 3,400 3,740
Steker biasa baru no.344 Puter Steke buah 3,400 3,740 3,400 3,740
Over steker gepeng no.644 Puter Steke buah 5,100 5,610 5,100 5,610
Over steker no.844 Puter Steke buah 7,900 8,690 7,900 8,690
Steker orde baru no.3300 Puter Steke buah 11,800 12,980 11,800 12,980
Steker Orde no.3340 Puter Steke buah 15,200 16,720 15,200 16,720
Steker Super no.3360 Puter Steke buah 19,000 20,900 19,000 20,900
Steker pase baru no.4320 Puter Steke buah 46,700 51,370 46,700 51,370
T.orde no.4330 Puter Steke buah 55,600 61,160 55,600 61,160
4 Lobang Puter Steke buah 33,700 37,070 33,700 37,070
47 Smealdrad - Ukuran 30 mm batang 16,300 17,930 16,300 17,930
Smealdrad - Ukuran 60 mm batang 23,600 25,960 23,600 25,960
Smealdrad - Ukuran 100 mm batang 5,700 6,270 5,700 6,270
48 Skering Batu - Ukuran 6 A / 10 A Biasa buah 4,000 4,400 4,000 4,400
Skering Batu - Ukuran 20 A batang 4,000 4,400 4,000 4,400
Skering Batu - Ukuran 25 A batang 4,000 4,400 4,000 4,400
Skering Batu - Ukuran 35 A batang 6,800 7,480 6,800 7,480
Skering Batu - Ukuran 63 A batang 10,200 11,220 10,200 11,220
Skering Batu - Ukuran 2 A, 6 Volt batang 5,700 6,270 5,700 6,270
49 Sekering otomatis - Ukuran 6 A/10 A batang 60,700 66,770 60,700 66,770
Sekering otomatis - Ukuran 16 A batang 64,100 70,510 64,100 70,510
Sekering otomatis - Ukuran 20 A batang 60,000 66,000 60,000 66,000
Sekering otomatis - Ukuran 25 A batang 71,900 79,090 71,900 79,090
50 Stop Up - -
Stop Up DN - Ukuran 300 Watt buah 63,500 69,850 63,500 69,850
Stop Up DN - Ukuran 500 Watt buah 114,600 126,060 114,600 126,060
- -
Stop star Vel-U - Ukuran 500 Watt buah 233,200 256,520 233,200 256,520
51 Stop Up dan Down LN- Ukuran 300 Watt buah 444,900 489,390 444,900 489,390
Stop Up dan Down LN- Ukuran 2000 Watt buah 528,100 580,910 528,100 580,910
52 Stavolt- Matsunaga 500 Watt buah 1,550,500 1,705,550 1,550,500 1,705,550
Stavolt- AECO 500 Watt buah 849,400 934,340 849,400 934,340
Stavolt- Matsunaga 1000 Watt buah 2,494,200 2,743,620 2,494,200 2,743,620
Stavolt- Matsunaga 2000 Watt buah 7,145,500 7,860,050 7,145,500 7,860,050
Stavolt- AVROB buah 142,700 156,970 142,700 156,970
53 Steker Arde Broco buah 14,100 15,510 14,100 15,510
54 Steker Arde Fuse Broco buah 10,200 11,220 10,200 11,220
55 Stop Kontak Arde Tanam buah 16,300 17,930 16,300 17,930
56 Stop Kontak Arde Timbul Broco buah 16,900 18,590 16,900 18,590
57 Saklar Double Tanam Broco buah 21,400 23,540 21,400 23,540
58 Saklar Tunggal Tanam Broco buah 22,400 24,640 18,840 24,640
Saklar Ganda NO.6627 buah 27,000 29,700 27,000 29,700
59 Seltip rol 7,200 7,920 7,200 7,920
60 Stater 40 watt kotak 130,900 143,990 130,900 143,990
61 Stop Kontak Timbul Broco buah 14,100 15,510 14,100 15,510
62 Tespen kecil tanggung buah 7,300 8,030 7,300 8,030
Tespen besar buah 10,700 11,770 10,700 11,770
63 Terminal- Ukuran 4 mm batang 16,900 18,590 16,900 18,590
Terminal- Ukuran 16 mm batang 48,000 52,800 48,000 52,800
Terminal- Ukuran 100 mm batang 110,700 121,770 110,700 121,770
64 Trafote/Transformeter - -
Trafo : merk Philips- Ukuran 10W/110 volt buah 33,700 37,070 33,700 37,070
Trafo : merk Philips- Ukuran 20W /220 volt buah 39,400 43,340 39,400 43,340
Trafo : merk Philips- Ukuran 10W/220 volt buah 39,400 43,340 39,400 43,340
Trafo : merk Philips- ukuran 15 W/220 volt buah 42,700 46,970 42,700 46,970
Trafo : merk Philips- Ukuran 40 W /220 volt buah 78,700 86,570 78,700 86,570
Trafo : merk Philips- Ukuran 40 W/Ten buah 42,200 46,420 42,200 46,420
65 Timer 15 Ampere- 250 Volt Ac buah 95,500 105,050 95,500 105,050
66 Kondensor AC LG 1 unit 539,300 593,230 539,300 593,230
Kondensor AC LG 11/2 unit 275,000 302,500 275,000 302,500
67 Kapasitor AC Toshiba unit 269,700 296,670 269,700 296,670
Kapasitor Pen AC Uchida unit 67,500 74,250 67,500 74,250
68 Evapulator AC Toshiba unit 674,100 741,510 674,100 741,510
69 Kompresor AC Uchida unit 2,049,300 2,254,230 2,049,300 2,254,230
Kompresor AC Golstar unit 1,388,700 1,527,570 1,388,700 1,527,570
70 Alat Kelistrikan set 337,100 370,810 337,100 370,810
71 Lampu Taman Tabung buah 175,300 192,830 175,300 192,830
Lampu Taman Fitting buah 20,300 22,330 20,300 22,330
Lampu Taman Balon buah 67,500 74,250 67,500 74,250
Lampu Taman Kabel rol 674,100 741,510 674,100 741,510