REKAPITULASI

TUGAS : RENCANA ANGGARAN BIAYA


PEKERJAAN : SMK MUHAMMDIYAH BELIK

NO. URAIAN PEKERJAAN HARGA


I. PEKERJAAN PERSIAPAN Rp 6,750,000.00
II. PEKERJAAN GALIAN Rp 16,820,200.00
III. PEKERJAAN PASANGAN DAN PLESTERAN Rp 273,642,664.90
IV. PEKERJAAN BETON Rp 359,053,680.75
V. PEKERJAAN PINTU DAN JENDELA Rp 25,000,000.00
VI. PEKERJAAN KUDA-KUDA DAN LISTPLANK Rp 31,080,000.00
VII. PASANGAN ATAP DAN PLAFOND Rp 16,576,407.90
VIII. PEKERJAAN LANTAI Rp 46,890,478.80
X. PEKERJAAN CAT Rp 13,864,776.51
XI. PEKERJAAN INSTALASI LISTRIK DAN AIR Rp 2,905,800.00
Total = Rp 792,584,008.86
PPN 10 % = Rp 79,258,400.89
Jumlah = Rp 871,842,409.75
Pembulatan = Rp 871,842,000.00
RENCANA ANGGARAN BIAYA

TUGAS : RENCANA ANGGARAN BIAYA


PEKERJAAN : SMK MUHAMMDIYAH BELIK

No. Jenis Pekerjaan Sat. Volume Harga Satuan Total Harga


1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 1.00 Rp 500,000.00 Rp 500,000.00
2 Pasang Papan Nama Proyek Ls 1.00 Rp 250,000.00 Rp 250,000.00
3 Pengukuran dan Bowplank Gedung Ls 1.00 Rp 3,000,000.00 Rp 3,000,000.00
4 Administrasi dan Dokumentasi Ls 1.00 Rp 2,000,000.00 Rp 2,000,000.00
5 Penyediaan Air Kerja Ls 1.00 Rp 1,000,000.00 Rp 1,000,000.00
Rp 6,750,000.00
II. PEKERJAAN GALIAN
1 Galian Tanah Pondasi m³ 118.40 Rp 78,750.00 Rp 9,324,000.00
2 Urugan Tanah Kembali m³ 29.60 Rp 57,500.00 Rp 1,702,000.00
3 Urugan Pasir di Bawah Pondasi m³ 14.80 Rp 391,500.00 Rp 5,794,200.00
TOTAL Rp 16,820,200.00
III. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Anstamping m³ 22.20 Rp 377,430.00 Rp 8,378,946.00
2 Pasangan Pondasi Batu Karang (1 pc : 4 psr) m³ 77.33 Rp 687,530.00 Rp 53,166,694.90
3 Pasangan Tembok Biasa (1 pc : 5 psr) m² 592.00 Rp 191,974.00 Rp 113,648,608.00
4 Plesteran (1 pc : 5 psr) m² 1184.00 Rp 50,924.00 Rp 60,294,016.00
5 Acian m² 1184.00 Rp 32,225.00 Rp 38,154,400.00
TOTAL Rp 273,642,664.90
IV. PEKERJAAN BETON
1 cakar ayam m³ 9.40 Rp 3,810,700.00 Rp 35,820,580.00
2 Pek. Sloof dan Ringbalk 15/20 Camp. 1 Pc : 2 Ps : 3 Kr m³ 4.44 Rp 3,810,700.00 Rp 16,919,508.00
3 kolom 30 x 30 m³ 20.563 Rp 3,810,700.00 Rp 78,357,518.75
4 ring balk 0,3 x 0,6 m³ 11.52 Rp 3,810,700.00 Rp 43,899,264.00
5 Pek. Cor lantai o,12 m m³ 36.00 Rp 3,810,700.00 Rp 137,185,200.00
6 Pek. Cor tangga m³ 1.20 Rp 3,810,700.00 Rp 4,572,840.00
11 ring balk 20 x 25 m³ 11.10 Rp 3,810,700.00 Rp 42,298,770.00
TOTAL Rp 359,053,680.8
V. PEKERJAAN PINTU DAN JENDELA
1 Pasangan Kusen dan daun almunium bh 4.00 Rp 2,000,000.00 Rp 8,000,000.00
3 Pasangan Daun Jendela m² 20.00 Rp 850,000.00 Rp 17,000,000.00
TOTAL Rp 25,000,000.0
VI. PEKERJAAN KUDA-KUDA DAN LISTPLANK
1 Pek. Kuda - Kuda baja ringan m³ 155.40 Rp 120,000.00 Rp 18,648,000.00
2 Pek.penutup atap galfalum m³ 155.40 Rp 80,000.00 Rp 12,432,000.00
TOTAL Rp 31,080,000.00
VII. PASANGAN ATAP DAN PLAFOND
3 Pas. Plafond Tripleks 2,88 mm & Rangka m² 360.00 Rp 38,422.50 Rp 13,832,100.00
4 Pas. List Penutup Plafond (Berprofil) m' 139.98 Rp 19,605.00 Rp 2,744,307.90
TOTAL Rp 16,576,407.90

RAB 2007
RALNO_ @ CVL
VIII. PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 40/40 m² 360.00 Rp 122,060.00 Rp 43,941,600.00
2 Pasangan Tegel Plint 10/30 m' 51.10 Rp 57,708.00 Rp 2,948,878.80
TOTAL Rp 46,890,478.80
IX PEKERJAAN CAT
1 Cat Tembok m² 61.38 Rp 14,946.00 Rp 917,376.51
2 Cat Plafond m² 360.00 Rp 35,965.00 Rp 12,947,400.00
TOTAL Rp 13,864,776.51
X PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Pekerjaan Instalasi Kabel Buah 7 Rp 50,000.00 Rp 350,000.00
2 Pasangan Lampu SL 25 Watt Buah 6 Rp 55,000.00 Rp 330,000.00
3 Pasangan Lampu SL 10 Watt Buah 20 Rp 35,000.00 Rp 700,000.00
4 Pasangan Saklar Tunggal Buah 3 Rp 17,500.00 Rp 52,500.00
5 Pasangan Saklar Ganda Buah 1 Rp 17,500.00 Rp 17,500.00
6 Pasangan Stop Kontak Buah 4 Rp 17,500.00 Rp 70,000.00
7 Pasangan Kotak Sekring Buah 1 Rp 75,000.00 Rp 75,000.00
8 Pasangan Bak Air Viber Buah 1 Rp 1,310,800.00 Rp 1,310,800.00
TOTAL Rp 2,905,800.00

RAB 2007
RALNO_ @ CVL
ANALISA HARGA SATUAN

TUGAS : RENCANA ANGGARAN BIAYA


PEKERJAAN : SMK MUHAMMDIYAH BELIK
### ###

1). 1 m3 Galian Tanah biasa


Tenaga
Pekerja 0.750 Oh x Rp. 100,000.00 ,- = Rp. 75,000.00 ,-
Mandor 0.025 Oh x Rp. 150,000.00 ,- = Rp. 3,750.00 ,-
Jumlah = Rp. 78,750.00 ,-

2). 1 m3 Urugan Tanah


Tenaga
Pekerja 0.500 Oh x Rp. 100,000.00 ,- = Rp. 50,000.000 ,-
Mandor 0.050 Oh x Rp. 150,000.00 ,- = Rp. 7,500.000 ,-
Jumlah = Rp. 57,500.000 ,-

3). 1 m3 Urugan Pasir


a. Bahan
Pasir urug 1.200 M3 x Rp. 300,000.00 ,- = Rp. 360,000.00 ,-
Sub Jumlah (1) = Rp. 360,000.00 ,-

b. Tenaga
Pekerja 0.300 Oh x Rp. 100,000.00 ,- = Rp. 30,000.00 ,-
Mandor 0.010 Oh x Rp. 150,000.00 ,- = Rp. 1,500.00 ,-
Sub Jumlah (2) = Rp. 31,500.00 ,-
Jumlah (1) + (2) = Rp. 391,500.00 ,-

4). 1 m3 Urugan Sirtu padat untuk peninggian lantai bangunan


a. Bahan
Sirtu urug 1.200 M3 x Rp. 300,000.00 ,- = Rp. 360,000.00 ,-
Sub Jumlah (1) = Rp. 360,000.00 ,-

b. Tenaga
Pekerja 0.250 Oh x Rp. 100,000.00 ,- = Rp. 25,000.00 ,-
Mandor 0.025 Oh x Rp. 150,000.00 ,- = Rp. 3,750.00 ,-
Sub Jumlah (2) = Rp. 28,750.00 ,-
Jumlah (1) + (2) = Rp. 388,750.00 ,-

5). 1 m3 Pasangan Pondasi Batu Kali (1 Pc : 5 Ps)


a. Bahan
Batu belah 15/20 cm 1.100 M3 x Rp. 130,000.00 ,- = Rp. 143,000.00 ,-
Semen portland 136.000 Kg x Rp. 1,200.00 ,- = Rp. 163,200.00 ,-
Pasir pasang 0.544 M3 x Rp. 270,000.00 ,- = Rp. 146,880.00 ,-
Sub Jumlah (1) ,- = Rp. 453,080.00 ,-

b. Tenaga
Pekerja 1.500 Oh x Rp. 100,000.00 ,- = Rp. 150,000.00 ,-
Tukang batu 0.600 Oh x Rp. 110,000.00 ,- = Rp. 66,000.00 ,-
Kepala tukang 0.060 Oh x Rp. 120,000.00 ,- = Rp. 7,200.00 ,-
Mandor 0.075 Oh x Rp. 150,000.00 ,- = Rp. 11,250.00 ,-
Sub Jumlah (2) = Rp. 234,450.00 ,-
Jumlah (1) + (2) = Rp. 687,530.00 ,-

RAB 2007
RALNO_ @ CVL
6). 1 m3 Pasangan Pondasi Batu Kosong (Aanstamping)
a. Bahan
Batu belah 15/20 cm 1.200 M3 x Rp. 130,000.00 ,- = Rp. 156,000.00 ,-
Pasir urug 0.300 M3 x Rp. 300,000.00 ,- = Rp. 90,000.00 ,-
Sub Jumlah (1) ,- = Rp. 246,000.00 ,-

b. Tenaga
Pekerja 0.780 Oh x Rp. 100,000.00 ,- = Rp. 78,000.00 ,-
Tukang batu 0.390 Oh x Rp. 110,000.00 ,- = Rp. 42,900.00 ,-
Kepala tukang 0.039 Oh x Rp. 120,000.00 ,- = Rp. 4,680.00 ,-
Mandor 0.039 Oh x Rp. 150,000.00 ,- = Rp. 5,850.00 ,-
Sub Jumlah (2) = Rp. 131,430.00 ,-
Jumlah (1) + (2) = Rp. 377,430.00 ,-

7). 1 m2 Pasangan batako (Tembok Biasa), 1 Pc : 4 Ps


a. Bahan
Batako 10 x 20 x 40 cm 12.500 Bh x Rp. 2,400.00 ,- = Rp. 30,000.00 ,-
Semen portland 14.370 Kg x Rp. 1,200.00 ,- = Rp. 17,244.00 ,-
Pasir pasang 0.364 M3 x Rp. 270,000.00 ,- = Rp. 98,280.00 ,-
Sub Jumlah (1) ,- = Rp. 145,524.00 ,-

b. Tenaga
Pekerja 0.320 Oh x Rp. 100,000.00 ,- = Rp. 32,000.000 ,-
Tukang batu 0.100 Oh x Rp. 110,000.00 ,- = Rp. 11,000.000 ,-
Kepala tukang 0.010 Oh x Rp. 120,000.00 ,- = Rp. 1,200.000 ,-
Mandor 0.015 Oh x Rp. 150,000.00 ,- = Rp. 2,250.000 ,-
Sub Jumlah (2) = Rp. 46,450.000 ,-
Jumlah (1) + (2) = Rp. 191,974.00 ,-

7). 1 m2 Pasangan Tembok Trasraam, 1 Pc : 3 Ps


a. Bahan
Batako 10 x 20 x 40 cm 12.500 Bh x Rp. 2,400.00 ,- = Rp. 30,000.00 ,-
Semen portland 16.160 Kg x Rp. 1,200.00 ,- = Rp. 19,392.00 ,-
Pasir pasang 0.574 M3 x Rp. 270,000.00 ,- = Rp. 154,980.00 ,-
Sub Jumlah (1) ,- = Rp. 204,372.00 ,-

b. Tenaga
Pekerja 0.320 Oh x Rp. 100,000.00 ,- = Rp. 32,000.00 ,-
Tukang batu 0.100 Oh x Rp. 110,000.00 ,- = Rp. 11,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 120,000.00 ,- = Rp. 1,200.00 ,-
Mandor 0.015 Oh x Rp. 150,000.00 ,- = Rp. 2,250.00 ,-
Sub Jumlah (2) = Rp. 46,450.00 ,-
Jumlah (1) + (2) = Rp. 250,822.00 ,-

RAB 2007
RALNO_ @ CVL
8). 1 m2 Plesteran Tembok Biasa 1 Pc : 5 Ps, tebal 15 mm
a. Bahan
Semen portland 4.320 Kg x Rp. 1,200.00 ,- = Rp. 5,184.00 ,-
Pasir pasang 0.022 M3 x Rp. 270,000.00 ,- = Rp. 5,940.00 ,-
Sub Jumlah (1) ,- = Rp. 11,124.00 ,-

b. Tenaga
Pekerja 0.200 Oh x Rp. 100,000.00 ,- = Rp. 20,000.00 ,-
Tukang batu 0.150 Oh x Rp. 110,000.00 ,- = Rp. 16,500.00 ,-
Kepala tukang 0.015 Oh x Rp. 120,000.00 ,- = Rp. 1,800.00 ,-
Mandor 0.010 Oh x Rp. 150,000.00 ,- = Rp. 1,500.00 ,-
Sub Jumlah (2) = Rp. 39,800.00 ,-
Jumlah (1) + (2) = Rp. 50,924.00 ,-

8). 1 m2 Acian Bidang Plesteran


a. Bahan
Semen portland 3.250 Kg x Rp. 1,200.00 ,- = Rp. 3,900.00 ,-
Sub Jumlah (1) ,- = Rp. 3,900.00 ,-

b. Tenaga
Pekerja 0.150 Oh x Rp. 100,000.00 ,- = Rp. 15,000.00 ,-
Tukang batu 0.100 Oh x Rp. 110,000.00 ,- = Rp. 11,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 120,000.00 ,- = Rp. 1,200.00 ,-
Mandor 0.008 Oh x Rp. 150,000.00 ,- = Rp. 1,125.00 ,-
Sub Jumlah (2) = Rp. 28,325.00 ,-
Jumlah (1) + (2) = Rp. 32,225.00 ,-

9). 1m3 Membuat sloof & Ringbalk beton bertulang (150 kg besi + bekesting)
a. Bahan
Kayu 0.270 M3 x Rp. 1,519,000.00 ,- = Rp. 410,130.00 ,-
Paku biasa 2"-5" 2.000 Kg x Rp. 15,000.00 ,- = Rp. 30,000.00 ,-
Minyak bekesting 0.600 lt x Rp. 11,500.00 ,- = Rp. 6,900.00 ,-
Besi beton polos 150.000 Kg x Rp. 11,000.00 ,- = Rp. 1,650,000.00 ,-
Kawat beton 3.000 Kg x Rp. 20,000.00 ,- = Rp. 60,000.00 ,-
Semen portland 323.000 Kg x Rp. 1,200.00 ,- = Rp. 387,600.00 ,-
Pasir beton 0.520 M3 x Rp. 270,000.00 ,- = Rp. 140,400.00 ,-
Koral beton 0.780 M3 x Rp. 270,000.00 ,- = Rp. 210,600.00 ,-
Sub Jumlah (1) = Rp. 2,895,630.00 ,-

b. Tenaga
Pekerja 4.850 Oh x Rp. 100,000.00 ,- = Rp. 485,000.00 ,-
Tukang batu 0.350 Oh x Rp. 110,000.00 ,- = Rp. 38,500.00 ,-
Tukang kayu 1.560 Oh x Rp. 110,000.00 ,- = Rp. 171,600.00 ,-
Tukang besi 1.400 Oh x Rp. 110,000.00 ,- = Rp. 154,000.00 ,-
Kepala tukang 0.331 Oh x Rp. 120,000.00 ,- = Rp. 39,720.00 ,-
Mandor 0.175 Oh x Rp. 150,000.00 ,- = Rp. 26,250.00 ,-
Sub Jumlah (2) = Rp. 915,070.00 ,-
Jumlah (1) + (2) = Rp. 3,810,700.00 ,-

RAB 2007
RALNO_ @ CVL
14). 1m3 Membuat kolom beton bertulang (200 kg besi + bekesting)
a. Bahan
Kayu terentang 0.400 M3 x Rp. 1,519,000.00 ,- = Rp. 607,600.00 ,-
Paku biasa 2"-5" 4.000 Kg x Rp. 15,000.00 ,- = Rp. 60,000.00 ,-
Minyak bekesting 2.000 lt x Rp. 11,500.00 ,- = Rp. 23,000.00 ,-
Besi beton polos 200.000 Kg x Rp. 11,000.00 ,- = Rp. 2,200,000.00 ,-
Kawat beton 4.500 Kg x Rp. 20,000.00 ,- = Rp. 90,000.00 ,-
Semen portland 323.000 Kg x Rp. 1,200.00 ,- = Rp. 387,600.00 ,-
Pasir beton 0.520 M3 x Rp. 270,000.00 ,- = Rp. 140,400.00 ,-
Koral beton 0.780 M3 x Rp. 270,000.00 ,- = Rp. 210,600.00 ,-
Kayu usuk 5/7 (kemiri) 0.150 M3 x Rp. 1,519,000.00 ,- = Rp. 227,850.00 ,-
Tripleks 2.8 mm 3.500 lbr x Rp. 48,100.00 ,- = Rp. 168,350.00 ,-
Dolken Ø 8cm/4m 20.000 btg x Rp. 6,000.00 ,- = Rp. 120,000.00 ,-
Sub Jumlah (1) = Rp. 4,235,400.00 ,-

b. Tenaga
Pekerja 7.300 Oh x Rp. 100,000.00 ,- = Rp. 730,000.00 ,-
Tukang batu 0.350 Oh x Rp. 110,000.00 ,- = Rp. 38,500.00 ,-
Tukang kayu 3.300 Oh x Rp. 110,000.00 ,- = Rp. 363,000.00 ,-
Tukang besi 2.100 Oh x Rp. 110,000.00 ,- = Rp. 231,000.00 ,-
Kepala tukang 0.570 Oh x Rp. 120,000.00 ,- = Rp. 68,400.00 ,-
Mandor 0.250 Oh x Rp. 150,000.00 ,- = Rp. 37,500.00 ,-
Sub Jumlah (2) = Rp. 1,468,400.00 ,-
Jumlah (1) + (2) = Rp. 5,703,800.00 ,-

15). 1m3 Membuat beton Rabat 1Pc : 3Psr :5Kr


a. Bahan
Semen portland 218.000 Kg x Rp. 1,200.00 ,- = Rp. 261,600.00 ,-
Pasir beton 0.520 M3 x Rp. 270,000.00 ,- = Rp. 140,400.00 ,-
Koral beton 0.870 M3 x Rp. 270,000.00 ,- = Rp. 234,900.00 ,-
Sub Jumlah (1) 636,900.00
b. Tenaga
Pekerja 1.650 Oh x Rp. 100,000.00 ,- = Rp. 165,000.00 ,-
Tukang batu 0.250 Oh x Rp. 110,000.00 ,- = Rp. 27,500.00 ,-
Kepala tukang 0.025 Oh x Rp. 120,000.00 ,- = Rp. 3,000.00 ,-
Mandor 0.080 Oh x Rp. 150,000.00 ,- = Rp. 12,000.00 ,-
Sub Jumlah (2) = Rp. 207,500.00 ,-
Jumlah (1) + (2) = Rp. 844,400.00 ,-

RAB 2007
RALNO_ @ CVL
16). 1 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas I
a. Bahan
Kayu jati, balok 1.1000 M3 x Rp. 6,670,000.00 ,- = Rp. 7,337,000.00 ,-
Paku 10 cm 1.2500 kg x Rp. 15,000.00 ,- = Rp. 18,750.00 ,-
Lem Kayu 1.0000 kg x Rp. 40,000.00 ,- = Rp. 40,000.00 ,-
Sub Jumlah (1) ,- = Rp. 7,395,750.00 ,-

b. Tenaga
Pekerja 6.000 Oh x Rp. 100,000.00 ,- = Rp. 600,000.00 ,-
Tukang kayu 20.000 Oh x Rp. 110,000.00 ,- = Rp. 2,200,000.00 ,-
Kepala tukang 2.000 Oh x Rp. 120,000.00 ,- = Rp. 240,000.00 ,-
Mandor 0.300 Oh x Rp. 150,000.00 ,- = Rp. 45,000.00 ,-
Sub Jumlah (2) = Rp. 3,085,000.00 ,-
Jumlah (1) + (2) = Rp. 10,480,750.00 ,-

17.) 1 m2 Membuat dan memasang daun pintu panel, kayu kelas I atau II
a. Bahan
Kayu jati, papan 0.0400 M3 x Rp. 6,680,000.00 ,- = Rp. 267,200.00 ,-
Lem Kayu 0.5000 kg x Rp. 40,000.00 ,- = Rp. 20,000.00 ,-
Sub Jumlah (1) ,- = Rp. 287,200.00 ,-

b. Tenaga
Pekerja 1.000 Oh x Rp. 100,000.00 ,- = Rp. 100,000.00 ,-
Tukang kayu 2.500 Oh x Rp. 110,000.00 ,- = Rp. 275,000.00 ,-
Kepala tukang 0.250 Oh x Rp. 120,000.00 ,- = Rp. 30,000.00 ,-
Mandor 0.050 Oh x Rp. 150,000.00 ,- = Rp. 7,500.00 ,-
Sub Jumlah (2) = Rp. 412,500.00 ,-
Jumlah (1) + (2) = Rp. 699,700.00 ,-

17.) 1 m2 Membuat dan memasang pintu dan jendela kaca, kayu kelas I atau II
a. Bahan
Kayu jati, papan 0.0240 M3 x Rp. 6,680,000.00 ,- = Rp. 160,320.00 ,-
Kaca reben 5 mm 1.0000 M2 x Rp. 60,400.00 ,- Rp. 60,400.00 ,-
Sub Jumlah (1) ,- = Rp. 220,720.00 ,-

b. Tenaga
Pekerja 0.800 Oh x Rp. 100,000.00 ,- = Rp. 80,000.00 ,-
Tukang kayu 2.000 Oh x Rp. 110,000.00 ,- = Rp. 220,000.00 ,-
Kepala tukang 0.200 Oh x Rp. 120,000.00 ,- = Rp. 24,000.00 ,-
Mandor 0.040 Oh x Rp. 150,000.00 ,- = Rp. 6,000.00 ,-
Sub Jumlah (2) = Rp. 330,000.00 ,-
Jumlah (1) + (2) = Rp. 550,720.00 ,-

18). 1 m3 Memasang konstruksi kuda-kuda konvensional, kayu kelas II


a. Bahan
Kayu kelas II 1.1000 M3 x Rp. 3,020,000.00 ,- = Rp. 3,322,000.00 ,-
Besi strip 15.0000 Kg x Rp. 12,600.00 ,- = Rp. 189,000.00 ,-
Paku baisa 2" - 5" 0.8000 Kg x Rp. 15,000.00 ,- = Rp. 12,000.00 ,-
Sub Jumlah (1) ,- = Rp. 3,523,000.00 ,-

b. Tenaga
Pekerja 4.000 Oh x Rp. 100,000.00 ,- = Rp. 400,000.00 ,-
Tukang kayu 12.000 Oh x Rp. 110,000.00 ,- = Rp. 1,320,000.00 ,-
Kepala tukang 1.200 Oh x Rp. 120,000.00 ,- = Rp. 144,000.00 ,-
Mandor 0.200 Oh x Rp. 150,000.00 ,- = Rp. 30,000.00 ,-
Sub Jumlah (2) = Rp. 1,894,000.00 ,-
Jumlah (1) + (2) = Rp. 5,417,000.00 ,-

18). 1 m3 Memasang konstruksi gording, kayu kelas II


a. Bahan
Kayu kelas II 1.1000 M3 x Rp. 3,020,000.00 ,- = Rp. 3,322,000.00 ,-
Paku baisa 2" - 5" 3.0000 Kg x Rp. 15,000.00 ,- = Rp. 45,000.00 ,-
Sub Jumlah (1) ,- = Rp. 3,367,000.00 ,-

RAB 2007
RALNO_ @ CVL
b. Tenaga
Pekerja 2.400 Oh x Rp. 100,000.00 ,- = Rp. 240,000.00 ,-
Tukang kayu 7.200 Oh x Rp. 110,000.00 ,- = Rp. 792,000.00 ,-
Kepala tukang 0.720 Oh x Rp. 120,000.00 ,- = Rp. 86,400.00 ,-
Mandor 0.120 Oh x Rp. 150,000.00 ,- = Rp. 18,000.00 ,-
Sub Jumlah (2) = Rp. 1,136,400.00 ,-
Jumlah (1) + (2) = Rp. 4,503,400.00 ,-

22). 1 m1 Memasang lisplank ukuran (3 x 20) cm, kayu kelas II


a. Bahan
Kayu kelas II 0.0108 M3 x Rp. 3,020,000.00 ,- = Rp. 32,616.00 ,-
Paku biasa 2" - 5" 0.1000 Kg x Rp. 15,000.00 ,- = Rp. 1,500.00 ,-
Sub Jumlah (1) ,- = Rp. 34,116.00 ,-

b. Tenaga
Pekerja 0.100 Oh x Rp. 100,000.00 ,- = Rp. 10,000.00 ,-
Tukang kayu 0.200 Oh x Rp. 110,000.00 ,- = Rp. 22,000.00 ,-
Kepala tukang 0.025 Oh x Rp. 120,000.00 ,- = Rp. 3,000.00 ,-
Mandor 0.005 Oh x Rp. 150,000.00 ,- = Rp. 750.00 ,-
Sub Jumlah (2) = Rp. 35,750.00 ,-
Jumlah (1) + (2) = Rp. 69,866.00 ,-

24) .1 m2 Pasang kaca , tebal 5 mm


a. Bahan
kaca reben 5 mm 1.100 M2 x Rp. 60,400.00 ,- = Rp. 66,440.00 ,-
Sub Jumlah (1) ,- = Rp. 66,440.00 ,-

b. Tenaga
Pekerja 0.015 Oh x Rp. 100,000.00 ,- = Rp. 1,500.00 ,-
Tukang ka yu 0.150 Oh x Rp. 110,000.00 ,- = Rp. 16,500.00 ,-
Kepala tukang 0.015 Oh x Rp. 120,000.00 ,- = Rp. 1,800.00 ,-
Mandor 0.00075 Oh x Rp. 120,000.00 ,- = Rp. 90.00 ,-
Sub Jumlah (2) = Rp. 19,890.00 ,-
Sub Jumlah (1) + (2) = Rp. 86,330.00 ,-
Jumlah (1) + (2) = Rp. 152,770.00 ,-

RAB 2007
RALNO_ @ CVL
25). 1 m2 Memasang Atap Seng Gelombang BJLS 0.30 mm
a. Bahan
Seng gelombang BJLS 0,30 mm 0.7000 Lbr x Rp. 55,200.00 ,- = Rp. 38,640.00 ,-
Paku seng 0.0200 Kg x Rp. 22,000.00 ,- = Rp. 440.00 ,-
Sub Jumlah (1) ,- = Rp. 39,080.00 ,-

b. Tenaga
Pekerja 0.120 Oh x Rp. 100,000.00 ,- = Rp. 12,000.00 ,-
Tukang kayu 0.060 Oh x Rp. 110,000.00 ,- = Rp. 6,600.00 ,-
Kepala tukang 0.006 Oh x Rp. 120,000.00 ,- = Rp. 720.00 ,-
Mandor 0.006 Oh x Rp. 150,000.00 ,- = Rp. 900.00 ,-
Sub Jumlah (2) = Rp. 20,220.00 ,-
Jumlah (1) + (2) = Rp. 59,300.00 ,-

26). 1 m1 Memasang Bubungan Atap Seng Gelombang BJLS 0.30 mm


a Bahan
Seng plat BJLS 0,30 mm 0.300 Lbr x Rp. 44,200.00 ,- = Rp. 13,260.00 ,-
Paku seng 0.040 Kg x Rp. 22,000.00 ,- = Rp. 880.00 ,-
Sub Jumlah (1) ,- = Rp. 14,140.00 ,-

b Tenaga
Pekerja 0.150 Oh x Rp. 100,000.00 ,- = Rp. 15,000.00 ,-
Tukang kayu 0.070 Oh x Rp. 110,000.00 ,- = Rp. 7,700.00 ,-
Kepala tukang 0.008 Oh x Rp. 120,000.00 ,- = Rp. 960.00 ,-
Mandor 0.008 Oh x Rp. 150,000.00 ,- = Rp. 1,200.00 ,-
Sub Jumlah (2) = Rp. 24,860.00 ,-
Jumlah (1) + (2) = Rp. 39,000.00 ,-

27). 1 m2 Memasang rangka langit-langit (60 x 60) cm, kayu kelas II


a Bahan
Kayu kelas II 0.0163 M3 x Rp. 3,020,000.00 ,- = Rp. 49,226.00 ,-
Paku biasa 2" - 5" 0.2500 Kg x Rp. 15,000.00 ,- = Rp. 3,750.00 ,-
Sub Jumlah (1) ,- = Rp. 52,976.00 ,-

b Tenaga
Pekerja 0.200 Oh x Rp. 100,000.00 ,- = Rp. 20,000.00 ,-
Tukang kayu 0.300 Oh x Rp. 110,000.00 ,- = Rp. 33,000.00 ,-
Kepala tukang 0.030 Oh x Rp. 120,000.00 ,- = Rp. 3,600.00 ,-
Mandor 0.010 Oh x Rp. 150,000.00 ,- = Rp. 1,500.00 ,-
Sub Jumlah (2) = Rp. 58,100.00 ,-
Jumlah (1) + (2) = Rp. 111,076.00 ,-

27). 1 m2 Memasang langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm dan 6 mm
a. Bahan
Tripleks 0.3750 Lbr x Rp. 48,100.00 ,- = Rp. 18,037.50 ,-
Paku tripleks 0.0300 Kg x Rp. 22,000.00 ,- = Rp. 660.00 ,-
Sub Jumlah (1) ,- = Rp. 18,697.50 ,-

b. Tenaga
Pekerja 0.0700 Oh x Rp. 100,000.00 ,- = Rp. 7,000.00 ,-
Tukang kayu 0.1000 Oh x Rp. 110,000.00 ,- = Rp. 11,000.00 ,-
Kepala tukang 0.0100 Oh x Rp. 120,000.00 ,- = Rp. 1,200.00 ,-
Mandor 0.0035 Oh x Rp. 150,000.00 ,- = Rp. 525.00 ,-
Sub Jumlah (2) = Rp. 19,725.00 ,-
Jumlah (1) + (2) = Rp. 38,422.50 ,-

RAB 2007
RALNO_ @ CVL
28). 1 m1 List plafond - kayu profil
a. Bahan
Kayu profil 1.050 M x Rp. 7,600.00 ,- = Rp. 7,980.00 ,-
Paku 0.010 kg x Rp. 15,000.00 ,- = Rp. 150.00 ,-
Sub Jumlah (1) ,- = Rp. 8,130.00 ,-

b. Tenaga
Pekerja 0.050 Oh x Rp. 100,000.00 ,- = Rp. 5,000.00 ,-
Tukang kayu 0.050 Oh x Rp. 110,000.00 ,- = Rp. 5,500.00 ,-
Kepala tukang 0.005 Oh x Rp. 120,000.00 ,- = Rp. 600.00 ,-
Mandor 0.003 Oh x Rp. 150,000.00 ,- = Rp. 375.00 ,-
Sub Jumlah (2) = Rp. 11,475.00 ,-
Jumlah (1) + (2) = Rp. 19,605.00 ,-

29). 1 m2 Pasang keramik warna ukuran 60 x 60 cm


a. Bahan
Keramik 60x60 cm 3.100 Bh x Rp. 45,100.00 ,- = Rp. 55,000.00 ,-
Semen portland 9.600 Kg x Rp. 1,200.00 ,- = Rp. 11,520.00 ,-
Pasir pasang 0.045 M3 x Rp. 270,000.00 ,- = Rp. 12,150.00 ,-
Semen warna 1.500 Kg x Rp. 2,500.00 ,- = Rp. 3,750.00 ,-
Sub Jumlah (1) ,- = Rp. 82,420.00 ,-

b. Tenaga
Pekerja 0.2500 Oh x Rp. 100,000.00 ,- = Rp. 25,000.00 ,-
Tukang batu 0.1200 Oh x Rp. 110,000.00 ,- = Rp. 13,200.00 ,-
Kepala tukang 0.0120 Oh x Rp. 120,000.00 ,- = Rp. 1,440.00 ,-
Mandor 0.0125 Oh x Rp. ,- = Rp. - ,-
Sub Jumlah (2) = Rp. 39,640.00 ,-
Jumlah (1) + (2) = Rp. 122,060.00 ,-

31). 1 m1 Memasang plint ubin PC warna ukuran (10 x 30) cm


a. Bahan
Plint ubin 10x30 cm 3.530 Bh x Rp. 10,000.00 ,- = Rp. 35,300.00 ,-
Semen portland 1.140 Kg x Rp. 1,200.00 ,- = Rp. 1,368.00 ,-
Pasir pasang 0.003 M3 x Rp. 270,000.00 ,- = Rp. 810.00 ,-
Semen warna 0.100 Kg x Rp. 2,500.00 ,- = Rp. 250.00 ,-
Sub Jumlah (1) ,- = Rp. 37,728.00 ,-

b. Tenaga
Pekerja 0.0900 Oh x Rp. 100,000.00 ,- = Rp. 9,000.00 ,-
Tukang batu 0.0900 Oh x Rp. 110,000.00 ,- = Rp. 9,900.00 ,-
Kepala tukang 0.0090 Oh x Rp. 120,000.00 ,- = Rp. 1,080.00 ,-
Mandor 0.0045 Oh x Rp. - ,- = Rp. - ,-
Sub Jumlah (2) = Rp. 19,980.00 ,-
Jumlah (1) + (2) = Rp. 57,708.00 ,-

RAB 2007
RALNO_ @ CVL
33). 1 Bh Kloset jongkok porselin
a. Bahan
Kloset jongkok porselin 1.000 Bh x Rp. 50,700.00 ,- = Rp. 50,700.00 ,-
Semen portland 6.000 Kg x Rp. 1,200.00 ,- = Rp. 7,200.00 ,-
Pasir pasang 0.010 M3 x Rp. 270,000.00 ,- = Rp. 2,700.00 ,-
Sub Jumlah (1) ,- = Rp. 60,600.00

b. Tenaga
Pekerja 1.000 Oh x Rp. 100,000.00 ,- = Rp. 100,000.00 ,-
Tukang batu 1.500 Oh x Rp. 110,000.00 ,- = Rp. 165,000.00 ,-
Kepala tukang 1.500 Oh x Rp. 120,000.00 ,- = Rp. 180,000.00 ,-
Mandor 0.160 Oh x Rp. - ,- = Rp. - ,-
Sub Jumlah (2) = Rp. 445,000.00 ,-
Jumlah (1) + (2) = Rp. 505,600.00 ,-

35). 1 Bh Bak air viber


a. Bahan
Bak teraso 1.000 Bh x Rp. 1,000,000.00 ,- = Rp. 1,000,000.00 ,-
Semen Portland 6.000 Kg x Rp. 1,200.00 ,- = Rp. 7,200.00 ,-
Pasir pasang 0.010 M3 x Rp. 270,000.00 ,- = Rp. 2,700.00 ,-
Sub Jumlah (1) ,- = Rp. 1,009,900.00

b. Tenaga
Pekerja 2.100 Oh x Rp. 100,000.00 ,- = Rp. 210,000.00 ,-
Tukang batu 0.750 Oh x Rp. 110,000.00 ,- = Rp. 82,500.00 ,-
Kepala tukang 0.070 Oh x Rp. 120,000.00 ,- = Rp. 8,400.00 ,-
Mandor 0.110 Oh x Rp. - ,- = Rp. - ,-
Sub Jumlah (2) = Rp. 300,900.00 ,-
Jumlah (1) + (2) = Rp. 1,310,800.00 ,-

RAB 2007
RALNO_ @ CVL
36). 1 Bh Kran air
a. Bahan
Kran air 1.000 Bh x Rp. 20,000.00 ,- = Rp. 20,000.00 ,-
Seal tape 0.025 Bh x Rp. 10,000.00 ,- = Rp. 250.00 ,-
Sub Jumlah (1) ,- = Rp. 20,250.00 ,-

b. Tenaga
Pekerja 0.010 Oh x Rp. 100,000.00 ,- = Rp. 1,000.00 ,-
Tukang batu 0.100 Oh x Rp. 110,000.00 ,- = Rp. 11,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 120,000.00 ,- = Rp. 1,200.00 ,-
Mandor 0.005 Oh x Rp. - ,- = Rp. - ,-
Sub Jumlah (2) = Rp. 13,200.00 ,-
Jumlah (1) + (2) = Rp. 33,450.00 ,-
37). 1 Bh Floor drain
a. Bahan
Floor drain 1.000 Bh x Rp. 15,800.00 ,- = Rp. 15,800.00 ,-
Sub Jumlah (1) ,- = Rp. 15,800.00 ,-

b. Tenaga
Pekerja 0.010 Oh x Rp. 100,000.00 ,- = Rp. 1,000.00 ,-
Tukang batu 0.100 Oh x Rp. 110,000.00 ,- = Rp. 11,000.00 ,-
Kepala tukang 0.010 Oh x Rp. 120,000.00 ,- = Rp. 1,200.00 ,-
Mandor 0.005 Oh x Rp. - ,- = Rp. - ,-
Sub Jumlah (2) = Rp. 13,200.00 ,-
Jumlah (1) + (2) = Rp. 29,000.00 ,-

38). 1 m2 Pengecatan tembok baru ( 1 plamir, 1 lapis cat dasar, 2 lapis cat penutup)
a Bahan
Plamir 0.100 Kg x Rp. 13,000.00 ,- = Rp. 1,300.00 ,-
Cat dasar 0.100 Kg x Rp. 11,000.00 ,- = Rp. 1,100.00 ,-
Cat penutup 2 x 0.26 Kg x Rp. 11,000.00 ,- = Rp. 2,860.00 ,-
Sub Jumlah (1) ,- = Rp. 5,260.00 ,-

b Tenaga
Pekerja 0.0200 Oh x Rp. 100,000.00 ,- = Rp. 2,000.00 ,-
Tukang cat 0.0630 Oh x Rp. 110,000.00 ,- = Rp. 6,930.00 ,-
Kepala tukang 0.0063 Oh x Rp. 120,000.00 ,- = Rp. 756.00 ,-
Mandor 0.0025 Oh x Rp. - ,- = Rp. - ,-
Sub Jumlah (2) = Rp. 9,686.00 ,-
Jumlah (1) + (2) = Rp. 14,946.00 ,-

39). 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
a. Bahan
Cat meni 0.200 Kg x Rp. 38,500.00 ,- = Rp. 7,700.00 ,-
Plamir 0.150 Kg x Rp. 20,000.00 ,- = Rp. 3,000.00 ,-
Cat dasar 0.17 Kg x Rp. 38,500.00 ,- = Rp. 6,545.00 ,-
Cat penutup 2 x 0.26 Kg x Rp. 38,500.00 ,- = Rp. 10,010.00 ,-
Sub Jumlah (1) ,- = Rp. 27,255.00 ,-

b. Tenaga
Pekerja 0.0700 Oh x Rp. 100,000.00 ,- = Rp. 7,000.00 ,-
Tukang cat 0.0090 Oh x Rp. 110,000.00 ,- = Rp. 990.00 ,-
Kepala tukang 0.0060 Oh x Rp. 120,000.00 ,- = Rp. 720.00 ,-
Mandor 0.0025 Oh x Rp. - ,- = Rp. - ,-
Sub Jumlah (2) = Rp. 8,710.00 ,-
Jumlah (1) + (2) = Rp. 35,965.00 ,-

RAB 2007
RALNO_ @ CVL
42). 1 Bh Pasang engsel
a. Bahan
Engsel pintu 1.000 Bh x Rp. 15,800.00 ,- = Rp. 15,800.00 ,-
Sub Jumlah (1a) ,- = Rp. 15,800.00 ,-

b. Tenaga
Pekerja 0.0150 Oh x Rp. 100,000.00 ,- = Rp. 1,500.00 ,-
Tukang kayu 0.1500 Oh x Rp. 110,000.00 ,- = Rp. 16,500.00 ,-
Kepala tukang 0.0150 Oh x Rp. 120,000.00 ,- = Rp. 1,800.00 ,-
Mandor 0.00075 Oh x Rp. - ,- = Rp. - ,-
Sub Jumlah (1b) = Rp. 19,800.00 ,-
Sub Jumlah (1) = Rp. 35,600.00 ,-
43). 1 Bh Pasang kait angin
a. Bahan
kait angin 1.000 Bh x Rp. 18,100.00 ,- = Rp. 18,100.00 ,-
Sub Jumlah (1) ,- = Rp. 18,100.00 ,-

b. Tenaga
Pekerja 0.0150 Oh x Rp. 100,000.00 ,- = Rp. 1,500.00 ,-
Tukang kayu 0.1500 Oh x Rp. 110,000.00 ,- = Rp. 16,500.00 ,-
Kepala tukang 0.0150 Oh x Rp. 120,000.00 ,- = Rp. 1,800.00 ,-
Mandor 0.00075 Oh x Rp. - ,- = Rp. - ,-
Sub Jumlah (1) = Rp. 19,800.00 ,-
Jumlah (1) + (2) = Rp. 37,900.00 ,-

RAB 2007
RALNO_ @ CVL
44). 1 buah pasang Grendel

a. Bahan
Grendel Ekspagnolet 1.000 Bh x Rp. 13,300.00 ,- = Rp. 13,300.00 ,-
Sub Jumlah (1) = Rp. 13,300.00 ,-

b. Tenaga
Pekerja 0.0050 Oh x Rp. 100,000.00 ,- = Rp. 500.00 ,-
Tukang kayu 0.5000 Oh x Rp. 110,000.00 ,- = Rp. 55,000.00 ,-
Kepala tukang 0.0050 Oh x Rp. 120,000.00 ,- = Rp. 600.00 ,-
Mandor 0.0025 Oh x Rp. 0.00 ,- = Rp. - ,-
Sub Jumlah (2) ,- = Rp. 56,100.00 ,-
Jumlah (1) + (2) = Rp. 69,400.00 ,-

46). 1 buah pasang kunci tanam dua kali putar

a. Bahan
kunci tanam biasa 1.000 Bh x Rp. 250,000.00 ,- = Rp. 250,000.00 ,-
Sub Jumlah (1) ,- = Rp. Rp 250,000.00 ,-

b. Tenaga
Pekerja 0.0100 Oh x Rp. 100,000.00 ,- = Rp. 1,000.00 ,-
Tukang kayu 0.5000 Oh x Rp. 110,000.00 ,- = Rp. 55,000.00 ,-
Kepala tukang 0.0100 Oh x Rp. 120,000.00 ,- = Rp. 1,200.00 ,-
Mandor 0.0050 Oh x Rp. 0.00 ,- = Rp. - ,-
Sub Jumlah (2) = Rp. 57,200.00 ,-
Jumlah (1) + (2) = Rp. 307,200.00 ,-

47). 1 m1 Memasang Pipa PVC 4"


a. Bahan
Pipa PVC 4" 1.200 Bh x Rp. 28,830.00 ,- = Rp. 34,596.00 ,-
Perlengkapan 35% harga pipa = Rp. 12,108.60 ,-
Sub Jumlah (1) = Rp. 46,704.60 ,-
b. Tenaga
Pekerja 0.036 Oh x Rp. 100,000.00 ,- = Rp. 3,600.00 ,-
Tukang batu 0.060 Oh x Rp. 110,000.00 ,- = Rp. 6,600.00 ,-
Kepala tukang 0.006 Oh x Rp. 120,000.00 ,- = Rp. 720.00 ,-
Mandor 0.0018 Oh x Rp. 0.00 ,- = Rp. - ,-
Sub Jumlah (2) ,- = Rp. 10,920.00 ,-
Jumlah (1) + (2) = Rp. 57,624.60 ,-

47). 1 m2 ijuk tebal lapisan 10 cm


a. Bahan
Ijuk 6.000 kg x Rp. 10,000.00 ,- = Rp. 60,000.00 ,-
Sub Jumlah (1) = Rp. 60,000.00 ,-
b. Tenaga
Pekerja 0.150 kg x Rp. 100,000.00 ,- = Rp. 15,000.00 ,-
Mandor 0.015 Oh x Rp. 150,000.00 ,- = Rp. 2,250.00 ,-
Sub Jumlah (2) ,- = Rp. 17,250.00 ,-
Jumlah (1) + (2) = Rp. 77,250.00 ,-

RAB 2007
RALNO_ @ CVL
DAFTAR HARGA SATUAN BAHAN BANGUNAN & UPAH KERJA

TUGAS : RENCANA ANGGARAN BIAYA


PEKERJAAN : SMK MUHAMMDIYAH BELIK

No. UPAH TENAGA KERJA Sat. Harga

1 Tukang Org/Hr 110,000


2 Kepala Tukang Org/Hr 120,000
3 Pekerja Org/Hr 100,000
4 Mandor Org/Hr 150,000
5 Sopir Org/Hr 150,000
6 Pembantu Sopir Org/Hr 120,000

No. HARGA SATUAN BAHAN Sat. Harga

1 Amplas Lbr 3,500


2 Angker Besi Dia. 12 - 40 cm Buah 12,500
3 Bak air Buah 1,000,000
4 Balok Kayu Kelas I (jati lokal) m3 6,670,000
5 Balok Kayu Kelas II (meranti) m3 3,020,000
6 Balok Kayu Kelas III (kemiri) m3 1,510,000
7 Batako/ Batu Cetak Buah 2,400
8 Batu Karang/Gladang m3 130,000
9 Batu Pecah Ukuran 2/3 ( split ) m3 270,000
10 Batu Roster Buah 10,000
11 Baut - Mur 20 cm Buah 12,600
12 Beugel Streep Plat Buah 12,600
13 Beugel U Bulat Buah 12,600
14 Beugel Strep 5 mm Buah 12,600
15 Besi Beton ϕ 6 Kg 11,000
16 Besi Beton ϕ 10 Kg 11,000
17 Cat Tembok Altex 5 Kg Kg 11,000
18 Cat Kayu Kg 38,500
19 Cat Seng Kg 38,500
20 Dempul Kayu Kg 20,000
21 Dop penguras Buah 5,000
22 Engsel Jendela merk ARCH/setara Buah 15,800
23 Engsel Pintu merk ARCH/setara Buah 15,800
24 Floor drain Buah 15,800
25 Grendel Jendela Buah 13,300
26 Grendel Pintu Buah 13,300
27 Ijuk Kg 10,000
28 Kaca Polos 5 mm m2 40,400
29 Kaca Reben 5 mm m2 60,400
30 Kait Angin Buah 18,100
31 Kawat Beton Kg 20,000
32 Kawat Ram m2 22,000
33 Kayu Usuk 5/7 m3 3,020,000
34 Keramik 30 x 30 Buah 8,000
35 Keramik 40 x 40 Buah 65,000
36 Keramik 10 x 30 Buah 10,000
37 Keramik 60x60 Buah 45,100
38 Kerikil urug karung 12,200
39 Kloset jongkok Buah 50,700
40 Kloset duduk Buah 400,700
41 Kran air 1/2" Buah 20,000
42 Kran air 3/4" Buah 25,000
43 Kuas Biasa 4"/5" Buah 15,000
44 Kuas Roll Besar Buah 22,000
45 Kunci Tanam 2x putar Buah 250,000
46 Lem Kayu (weber) Kg 40,000
47 Lem pipa PVC Buah 10,000
48 List Kaca m' 2,600
49 List Plafond Kayu m' 7,600
50 Meni Kayu Altex / Yoko Kg 45,000
51 Paku < 5 cm Kg 22,000
52 Paku > 5 cm Kg 15,000
53 Paku Seng Kg 22,000
54 Papan Kayu Kelas I (jati lokal) m3 6,680,000
55 Papan Kayu Kelas II (meranti) m3 3,020,000
56 Papan Kayu Kelas III (kemiri) m3 1,519,000
57 Pasir Cor/Beton m3 270,000
58 Pasir Pasangan m3 270,000
59 Pasir urug m3 300,000
60 Penguras bak Buah 7,500
61 Pipa PVC 1/2" m' 5,100
62 Pipa PVC 3/4" m' 6,330
63 Pipa PVC 2" m' 16,330
64 Pipa PVC 4" m' 28,830
65 Pipa gip 1/2" m' 11,100
66 Pipa gip 2" m' 27,600
67 Plamir Boyo 5 Kg Kg 13,000
68 Plamur Kayu Kg 17,500
69 Portland Cement ( PC ) Kg 1,200
70 Sealtip Buah 10,000
71 Semen Warna Kg 2,500
72 Seng Gelombang BJLS 0,30 Lbr 55,200
73 Seng Datar BJLS 0,30 Lbr 44,200
74 Seng bubungan m' 25,100
75 Tanah Timbun M3 63,000
76 Tanah Urug m3 300,000
77 Thinner Kg 35,000
78 Tripleks tebal 3 mm Lbr 48,100
79 Teakwood lapis aluminium Lbr 85,000

No. HARGA SATUAN LISTRIK Sat. Harga


80 Arde Buah 25,000
81 Embul dos Buah 5,000
82 Fitting Tempel Buah 15,000
83 Isolasi anabel Buah 10,000
84 Kabel NYM 2 x 1,5 m' 12,000
85 Kabel NYA 1 x 1,5 m' 5,000
86 Lampu hemat energi 10 watt Buah 35,000
87 Lampu hemat energi 25 watt Buah 55,000
88 MCB Buah 75,000
89 Pipa Listrik m' 2,500
90 Stop Kontak Buah 17,500
91 Saklar tunggal Buah 17,500
92 Saklar Ganda Buah 17,500
18,750
30,000
48,750

12

rp kg /kg
25000 2.66 9398.50

41400
MATERIAL ON SITE
TUGAS : RENCANA ANGGARAN BIAYA
PEKERJAAN : SMK MUHAMMDIYAH BELIK

Harga Tanpa Jarak Angkut Ongkos Retribusi Jumlah Harga


Jumlah Harga Biaya Jumlah Harga ( Jumlah Harga
No Nama Bahan Sat Pajak Di Quary / Rata-Rata Angkut/Unit Galian c Tanpa Pajak ( Rp
( Rp ) Overhead % Rp ) Dibulatkan ( Rp )
Toko ( Rp ) ( Km ) ( Rp ) ( Rp ) )
1 2 3 4 5 6 7=(4+6) 8 = ( 10 % x 7 ) 9 = ( 7 + 8 ) 10 11 = ( 9 + 10 ) 12

1 Amplas Lbr 3,200.00 10 24.94 3,224.94 322.49 3,547.43 3,547.43 3,500.00


2 Angker Besi Dia. 12 - 40 cm Buah 11,400.00 10 42.75 11,442.75 1,144.28 12,587.03 12,587.03 12,500.00
3 Bak air Buah 219,500.00 10 9,975.00 229,475.00 22,947.50 252,422.50 252,422.50 252,400.00
4 Balok Kayu Kelas I (jati lokal) m3 6,000,000.00 10 68,875.00 6,068,875.00 606,887.50 6,675,762.50 6,675,762.50 6,670,000.00
5 Balok Kayu Kelas II (meranti) m3 2,680,000.00 10 68,875.00 2,748,875.00 274,887.50 3,023,762.50 3,023,762.50 3,020,000.00
6 Balok Kayu Kelas III (kemiri) m3 1,310,000.00 10 68,875.00 1,378,875.00 137,887.50 1,516,762.50 1,516,762.50 1,510,000.00
7 Batako/ Batu Cetak Buah 1,850.00 10 418.00 2,268.00 226.80 2,494.80 2,494.80 2,400.00
8 Batu Karang/Gladang m3 90,000.00 10 21,375.00 111,375.00 11,137.50 122,512.50 7,500.00 130,012.50 130,000.00
9 Batu Pecah Ukuran 2/3 ( split ) m3 200,000.00 10 21,375.00 221,375.00 22,137.50 243,512.50 7,500.00 251,012.50 250,000.00
10 Batu Roster Buah 9,000.00 10 323.00 9,323.00 932.30 10,255.30 10,255.30 10,000.00
11 Baut - Mur 20 cm Buah 11,400.00 10 60.56 11,460.56 1,146.06 12,606.62 12,606.62 12,600.00
12 Beugel Streep Plat Buah 11,400.00 10 60.56 11,460.56 1,146.06 12,606.62 12,606.62 12,600.00
13 Beugel U Bulat Buah 11,400.00 10 60.56 11,460.56 1,146.06 12,606.62 12,606.62 12,600.00
14 Beugel Strep 5 mm Buah 11,400.00 10 60.56 11,460.56 1,146.06 12,606.62 12,606.62 12,600.00
15 Besi Beton ϕ 6 Kg 8,500.00 10 60.56 8,560.56 856.06 9,416.62 9,416.62 9,400.00
16 Besi Beton ϕ 10 Kg 8,500.00 10 60.56 8,560.56 856.06 9,416.62 9,416.62 9,400.00
17 Cat Tembok Altex 5 Kg Kg 40,000.00 10 42.75 40,042.75 4,004.28 44,047.03 44,047.03 44,000.00
18 Cat Kayu Kg 35,000.00 10 42.75 35,042.75 3,504.28 38,547.03 38,547.03 38,500.00
19 Cat Seng Kg 35,000.00 10 42.75 35,042.75 3,504.28 38,547.03 38,547.03 38,500.00
20 Dempul Kayu Kg 18,200.00 10 42.75 18,242.75 1,824.28 20,067.03 20,067.03 20,000.00
21 Dop penguras Buah 4,600.00 10 24.94 4,624.94 462.49 5,087.43 5,087.43 5,000.00
22 Engsel Jendela merk ARCH/se Buah 14,400.00 10 24.94 14,424.94 1,442.49 15,867.43 15,867.43 15,800.00
23 Engsel Pintu merk ARCH/seta Buah 14,400.00 10 24.94 14,424.94 1,442.49 15,867.43 15,867.43 15,800.00
24 Floor drain Buah 14,400.00 10 24.94 14,424.94 1,442.49 15,867.43 15,867.43 15,800.00
25 Grendel Jendela Buah 12,100.00 10 24.94 12,124.94 1,212.49 13,337.43 13,337.43 13,300.00
26 Grendel Pintu Buah 12,100.00 10 24.94 12,124.94 1,212.49 13,337.43 13,337.43 13,300.00
27 Ijuk Kg 9,100.00 10 27.91 9,127.91 912.79 10,040.70 10,040.70 10,000.00
28 Kaca Polos 5 mm m2 35,000.00 10 1,781.25 36,781.25 3,678.13 40,459.38 40,459.38 40,400.00
29 Kaca Reben 5 mm m2 53,200.00 10 1,781.25 54,981.25 5,498.13 60,479.38 60,479.38 60,400.00
30 Kait Angin Buah 16,400.00 10 71.25 16,471.25 1,647.13 18,118.38 18,118.38 18,100.00
31 Kawat Beton Kg 18,200.00 10 71.25 18,271.25 1,827.13 20,098.38 20,098.38 20,000.00
32 Kawat Ram m2 20,000.00 10 71.25 20,071.25 2,007.13 22,078.38 22,078.38 22,000.00
33 Kayu Usuk 5/7 m3 2,670,000.00 10 80,750.00 2,750,750.00 275,075.00 3,025,825.00 3,025,825.00 3,020,000.00
34 Keramik 30 x 30 Buah 7,200.00 10 149.63 7,349.63 734.96 8,084.59 8,084.59 8,000.00
35 Keramik 40 x 40 Buah 13,950.00 10 239.40 14,189.40 1,418.94 15,608.34 15,608.34 15,600.00
36 Keramik 10 x 30 Buah 9,100.00 10 74.81 9,174.81 917.48 10,092.29 10,092.29 10,000.00
37 Keramik 60x60 Buah 40,500.00 10 544.09 41,044.09 4,104.41 45,148.50 45,148.50 45,100.00
38 Kerikil urug karung 10,500.00 10 605.63 11,105.63 1,110.56 12,216.19 12,216.19 12,200.00
39 Kloset jongkok Buah 43,100.00 10 2,992.50 46,092.50 4,609.25 50,701.75 50,701.75 50,700.00
40 Kloset duduk Buah 361,300.00 10 2,992.50 364,292.50 36,429.25 400,721.75 400,721.75 400,700.00
41 Kran air 1/2" Buah 18,200.00 10 30.88 18,230.88 1,823.09 20,053.96 20,053.96 20,000.00
42 Kran air 3/4" Buah 22,750.00 10 30.88 22,780.88 2,278.09 25,058.96 25,058.96 25,000.00
43 Kuas Biasa 4"/5" Buah 13,650.00 10 30.88 13,680.88 1,368.09 15,048.96 15,048.96 15,000.00
44 Kuas Roll Besar Buah 20,000.00 10 30.88 20,030.88 2,003.09 22,033.96 22,033.96 22,000.00
45 Kunci Tanam 2x putar Buah 227,300.00 10 30.88 227,330.88 22,733.09 250,063.96 250,063.96 250,000.00
46 Lem Kayu (weber) Kg 36,400.00 10 30.88 36,430.88 3,643.09 40,073.96 40,073.96 40,000.00
47 Lem pipa PVC Buah 9,100.00 10 30.88 9,130.88 913.09 10,043.96 10,043.96 10,000.00
48 List Kaca m' 2,050.00 10 342.00 2,392.00 239.20 2,631.20 2,631.20 2,600.00
49 List Plafond Kayu m' 6,600.00 10 342.00 6,942.00 694.20 7,636.20 7,636.20 7,600.00
50 Meni Kayu Altex / Yoko Kg 40,900.00 10 60.56 40,960.56 4,096.06 45,056.62 45,056.62 45,000.00
51 Paku < 5 cm Kg 20,000.00 10 42.75 20,042.75 2,004.28 22,047.03 22,047.03 22,000.00
52 Paku > 5 cm Kg 13,650.00 10 42.75 13,692.75 1,369.28 15,062.03 15,062.03 15,000.00
53 Paku Seng Kg 20,000.00 10 42.75 20,042.75 2,004.28 22,047.03 22,047.03 22,000.00
54 Papan Kayu Kelas I (jati lokal) m3 6,000,000.00 10 80,750.00 6,080,750.00 608,075.00 6,688,825.00 6,688,825.00 6,680,000.00
55 Papan Kayu Kelas II (meranti) m3 2,670,000.00 10 80,750.00 2,750,750.00 275,075.00 3,025,825.00 3,025,825.00 3,020,000.00
56 Papan Kayu Kelas III (kemiri) m3 1,301,000.00 10 80,750.00 1,381,750.00 138,175.00 1,519,925.00 1,519,925.00 1,519,000.00
57 Pasir Cor/Beton m3 134,600.00 15 32,386.36 166,986.36 16,698.64 183,685.00 10,000.00 193,685.00 193,600.00
58 Pasir Pasangan m3 120,000.00 15 32,386.36 120,015.00 12,001.50 132,016.50 10,000.00 142,016.50 142,000.00
59 Pasir urug m3 26,900.00 10 21,375.00 48,275.00 4,827.50 53,102.50 10,000.00 63,102.50 63,100.00
60 Penguras bak Buah 6,800.00 10 24.94 6,824.94 682.49 7,507.43 7,507.43 7,500.00
61 Pipa PVC 1/2" m' 4,300.00 10 342.00 4,642.00 464.20 5,106.20 5,106.20 5,100.00
62 Pipa PVC 3/4" m' 5,420.00 10 342.00 5,762.00 576.20 6,338.20 6,338.20 6,330.00
63 Pipa PVC 2" m' 14,510.00 10 342.00 14,852.00 1,485.20 16,337.20 16,337.20 16,330.00
64 Pipa PVC 4" m' 25,870.00 10 342.00 26,212.00 2,621.20 28,833.20 28,833.20 28,830.00
65 Pipa gip 1/2" m' 9,800.00 10 342.00 10,142.00 1,014.20 11,156.20 11,156.20 11,100.00
66 Pipa gip 2" m' 24,800.00 10 342.00 25,142.00 2,514.20 27,656.20 27,656.20 27,600.00
67 Plamir Boyo 5 Kg Kg 11,800.00 10 42.75 11,842.75 1,184.28 13,027.03 13,027.03 13,000.00
68 Plamur Kayu Kg 15,900.00 10 42.75 15,942.75 1,594.28 17,537.03 17,537.03 17,500.00
69 Portland Cement ( PC ) Kg 1,000.00 10 60.56 1,060.56 106.06 1,166.62 1,166.62 1,100.00
70 Sealtip Buah 9,100.00 10 24.94 9,124.94 912.49 10,037.43 10,037.43 10,000.00
71 Semen Warna Kg 2,300.00 10 60.56 2,360.56 236.06 2,596.62 2,596.62 2,500.00
72 Seng Gelombang BJLS 0,30 Lbr 50,000.00 10 242.25 50,242.25 5,024.23 55,266.48 55,266.48 55,200.00
73 Seng Datar BJLS 0,30 Lbr 40,000.00 10 242.25 40,242.25 4,024.23 44,266.48 44,266.48 44,200.00
74 Seng bubungan m' 22,500.00 10 342.00 22,842.00 2,284.20 25,126.20 25,126.20 25,100.00
75 Tanah Timbun M3 33,700.00 10 21,375.00 55,075.00 5,507.50 60,582.50 2,500.00 63,082.50 63,000.00
76 Tanah Urug m3 33,700.00 10 21,375.00 55,075.00 5,507.50 60,582.50 2,500.00 63,082.50 63,000.00
77 Thinner Kg 31,800.00 10 30.88 31,830.88 3,183.09 35,013.96 35,013.96 35,000.00
78 Tripleks tebal 3 mm Lbr 43,500.00 10 242.25 43,742.25 4,374.23 48,116.48 48,116.48 48,100.00
79 Teakwood lapis aluminium Lbr 77,100.00 10 242.25 77,342.25 7,734.23 85,076.48 85,076.48 85,000.00
80 Arde Buah 22,750.00 10 30.88 22,780.88 2,278.09 25,058.96 25,058.96 25,000.00
81 Embul dos Buah 4,600.00 10 30.88 4,630.88 463.09 5,093.96 5,093.96 5,000.00
82 Fitting Tempel Buah 13,650.00 10 30.88 13,680.88 1,368.09 15,048.96 15,048.96 15,000.00
83 Isolasi anabel Buah 9,100.00 10 30.88 9,130.88 913.09 10,043.96 10,043.96 10,000.00
84 Kabel NYM 2 x 1,5 m' 10,900.00 10 30.88 10,930.88 1,093.09 12,023.96 12,023.96 12,000.00
85 Kabel NYA 1 x 1,5 m' 4,600.00 10 30.88 4,630.88 463.09 5,093.96 5,093.96 5,000.00
86 Lampu hemat energi 10 watt Buah 31,800.00 10 30.88 31,830.88 3,183.09 35,013.96 35,013.96 35,000.00
87 Lampu hemat energi 25 watt Buah 50,000.00 10 30.88 50,030.88 5,003.09 55,033.96 55,033.96 55,000.00
88 MCB Buah 68,200.00 10 30.88 68,230.88 6,823.09 75,053.96 75,053.96 75,000.00
89 Pipa Listrik m' 2,300.00 10 30.88 2,330.88 233.09 2,563.96 2,563.96 2,500.00
90 Stop Kontak Buah 15,900.00 10 30.88 15,930.88 1,593.09 17,523.96 17,523.96 17,500.00
91 Saklar tunggal Buah 15,900.00 10 30.88 15,930.88 1,593.09 17,523.96 17,523.96 17,500.00
92 Saklar Ganda Buah 15,900.00 10 30.88 15,930.88 1,593.09 17,523.96 17,523.96 17,500.00
ANALISA ANGKUTAN

TUGAS : RENCANA ANGGARAN BIAYA


PEKERJAAN : SMK MUHAMMDIYAH BELIK

KEC.
WAKTU WAKTU
KAPASIT TRUCK JARAK SEWA SOPIR DAN WAKTU WAKTU ONGKOS
JUMLAH BONGKA TEMPU ONGKOS ONGKOS UNIT KE
NO NAMA BAHAN SAT AS RATA- ANGKU TRUCK/JA PEMBANTU MUAT JALAN ANGKUT
SEWA (Rp) R-MUAT H TOTAL (Rp) (Rp) T
TRUCK RATA T (KM) M (Rp) (Rp) (MENIT) (MENIT) (Rp)
(MENIT) (MENIT)
KM/JAM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 Amplas Lbr 4000 50 10 93750 48,750.00 142,500.00 15 15 12.00 42.00 99,750.00 99,750.00 24.94
2 Angker Besi Dia. 12 - 40 cm Buah 4000 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 42.75
3 Bak air Buah 10 50 10 93750 48,750.00 142,500.00 15 15 12.00 42.00 99,750.00 99,750.00 9,975.00
4 Balok Kayu Kelas I (jati lokal) m3 3 50 10 93750 48,750.00 142,500.00 45 30 12.00 87.00 206,625.00 206,625.00 68,875.00
5 Balok Kayu Kelas II (meranti) m3 3 50 10 93750 48,750.00 142,500.00 45 30 12.00 87.00 206,625.00 206,625.00 68,875.00
6 Balok Kayu Kelas III (kemiri) m3 3 50 10 93750 48,750.00 142,500.00 45 30 12.00 87.00 206,625.00 206,625.00 68,875.00
7 Batako/ Batu Cetak Buah 750 50 10 93750 48,750.00 142,500.00 60 60 12.00 132.00 313,500.00 313,500.00 418.00
8 Batu Karang/Gladang m3 3 50 10 93750 48,750.00 142,500.00 10 5 12.00 27.00 64,125.00 64,125.00 21,375.00
9 Batu Pecah Ukuran 2/3 ( split ) m3 3 50 10 93750 48,750.00 142,500.00 10 5 12.00 27.00 64,125.00 64,125.00 21,375.00
10 Batu Roster Buah 750 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 323.00
11 Baut - Mur 20 cm Buah 4000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 60.56
12 Beugel Streep Plat Buah 4000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 60.56
13 Beugel U Bulat Buah 4000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 60.56
14 Beugel Strep 5 mm Buah 4000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 60.56
15 Besi Beton ϕ 6 Kg 4000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 60.56
16 Besi Beton ϕ 10 Kg 4000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 60.56
17 Cat Tembok Altex 5 Kg Kg 4000 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 42.75
18 Cat Kayu Kg 4000 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 42.75
19 Cat Seng Kg 4000 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 42.75
20 Dempul Kayu Kg 4000 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 42.75
21 Dop penguras Buah 4000 50 10 93750 48,750.00 142,500.00 15 15 12.00 42.00 99,750.00 99,750.00 24.94
22 Engsel Jendela merk ARCH/setara Buah 4000 50 10 93750 48,750.00 142,500.00 15 15 12.00 42.00 99,750.00 99,750.00 24.94
23 Engsel Pintu merk ARCH/setara Buah 4000 50 10 93750 48,750.00 142,500.00 15 15 12.00 42.00 99,750.00 99,750.00 24.94
24 Floor drain Buah 4000 50 10 93750 48,750.00 142,500.00 15 15 12.00 42.00 99,750.00 99,750.00 24.94
25 Grendel Jendela Buah 4000 50 10 93750 48,750.00 142,500.00 15 15 12.00 42.00 99,750.00 99,750.00 24.94
26 Grendel Pintu Buah 4000 50 10 93750 48,750.00 142,500.00 15 15 12.00 42.00 99,750.00 99,750.00 24.94
27 Ijuk Kg 4000 50 10 93750 48,750.00 142,500.00 30 5 12.00 47.00 111,625.00 111,625.00 27.91
28 Kaca Polos 5 mm m2 200 30 10 93750 48,750.00 142,500.00 40 40 20.00 100.00 356,250.00 356,250.00 1,781.25
29 Kaca Reben 5 mm m2 200 30 10 93750 48,750.00 142,500.00 40 40 20.00 100.00 356,250.00 356,250.00 1,781.25
30 Kait Angin Buah 4000 30 10 93750 48,750.00 142,500.00 30 30 20.00 80.00 285,000.00 285,000.00 71.25
31 Kawat Beton Kg 4000 30 10 93750 48,750.00 142,500.00 30 30 20.00 80.00 285,000.00 285,000.00 71.25
32 Kawat Ram m2 4000 30 10 93750 48,750.00 142,500.00 30 30 20.00 80.00 285,000.00 285,000.00 71.25
33 Kayu Usuk 5/7 m3 3 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 80,750.00
34 Keramik 30 x 30 Buah 2000 40 10 93750 48,750.00 142,500.00 45 45 15.00 105.00 299,250.00 299,250.00 149.63
35 Keramik 40 x 40 Buah 1250 40 10 93750 48,750.00 142,500.00 45 45 15.00 105.00 299,250.00 299,250.00 239.40
36 Keramik 10 x 30 Buah 4000 40 10 93750 48,750.00 142,500.00 45 45 15.00 105.00 299,250.00 299,250.00 74.81
37 Keramik 60x60 Buah 550 40 10 93750 48,750.00 142,500.00 45 45 15.00 105.00 299,250.00 299,250.00 544.09
38 Kerikil urug karung 400 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 605.63
39 Kloset jongkok Buah 100 40 10 93750 48,750.00 142,500.00 45 45 15.00 105.00 299,250.00 299,250.00 2,992.50
40 Kloset duduk Buah 100 40 10 93750 48,750.00 142,500.00 45 45 15.00 105.00 299,250.00 299,250.00 2,992.50
41 Kran air 1/2" Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
42 Kran air 3/4" Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
43 Kuas Biasa 4"/5" Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
44 Kuas Roll Besar Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
45 Kunci Tanam 2x putar Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
46 Lem Kayu (weber) Kg 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
47 Lem pipa PVC Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
48 List Kaca m' 500 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 342.00
49 List Plafond Kayu m' 500 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 342.00
50 Meni Kayu Altex / Yoko Kg 4000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 60.56
51 Paku < 5 cm Kg 4000 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 42.75
52 Paku > 5 cm Kg 4000 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 42.75
53 Paku Seng Kg 4000 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 42.75
54 Papan Kayu Kelas I (jati lokal) m3 3 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 80,750.00
55 Papan Kayu Kelas II (meranti) m3 3 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 80,750.00
56 Papan Kayu Kelas III (kemiri) m3 3 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 80,750.00
57 Pasir Cor/Beton m3 3 40 15 93750 48,750.00 142,500.00 10 5 22.50 37.50 97,159.09 97,159.09 32,386.36
58 Pasir Pasangan m3 3 40 15 93750 48,750.00 142,500.00 10 5 22.50 37.50 97,159.09 97,159.09 32,386.36
59 Pasir urug m3 3 50 10 93750 48,750.00 142,500.00 10 5 12.00 27.00 64,125.00 64,125.00 21,375.00
60 Penguras bak Buah 4000 50 10 93750 48,750.00 142,500.00 15 15 12.00 42.00 99,750.00 99,750.00 24.94
61 Pipa PVC 1/2" m' 500 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 342.00
62 Pipa PVC 3/4" m' 500 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 342.00
63 Pipa PVC 2" m' 500 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 342.00
64 Pipa PVC 4" m' 500 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 342.00
65 Pipa gip 1/2" m' 500 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 342.00
66 Pipa gip 2" m' 500 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 342.00
67 Plamir Boyo 5 Kg Kg 4000 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 42.75
68 Plamur Kayu Kg 4000 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 42.75
69 Portland Cement ( PC ) Kg 4000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 60.56
70 Sealtip Buah 4000 50 10 93750 48,750.00 142,500.00 15 15 12.00 42.00 99,750.00 99,750.00 24.94
71 Semen Warna Kg 4000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 60.56
72 Seng Gelombang BJLS 0,30 Lbr 1000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 242.25
73 Seng Datar BJLS 0,30 Lbr 1000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 242.25
74 Seng bubungan m' 500 50 10 93750 48,750.00 142,500.00 30 30 12.00 72.00 171,000.00 171,000.00 342.00
75 Tanah Timbun M3 3 50 10 93750 48,750.00 142,500.00 10 5 12.00 27.00 64,125.00 64,125.00 21,375.00
76 Tanah Urug m3 3 50 10 93750 48,750.00 142,500.00 10 5 12.00 27.00 64,125.00 64,125.00 21,375.00
77 Thinner Kg 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
78 Tripleks tebal 3 mm Lbr 1000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 242.25
79 Teakwood lapis aluminium Lbr 1000 50 10 93750 48,750.00 142,500.00 45 45 12.00 102.00 242,250.00 242,250.00 242.25
80 Arde Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
81 Embul dos Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
82 Fitting Tempel Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
83 Isolasi anabel Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
84 Kabel NYM 2 x 1,5 m' 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
85 Kabel NYA 1 x 1,5 m' 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
86 Lampu hemat energi 10 watt Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
87 Lampu hemat energi 25 watt Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
88 MCB Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
89 Pipa Listrik m' 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
90 Stop Kontak Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
91 Saklar tunggal Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
92 Saklar Ganda Buah 4000 50 10 93750 48,750.00 142,500.00 20 20 12.00 52.00 123,500.00 123,500.00 30.88
REKAPITULASI VOLUME
TUGAS : RENCANA ANGGARAN BIAYA
PEKERJAAN : SMK MUHAMMDIYAH BELIK

NO. URAIAN PEKERJAAN VOLUME SATUAN


I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.000 Ls
2 Pemasangan Papan Nama Proyek 1.000 Ls
3 Pengukuran dan Bowplank Gedung 1.000 Ls
4 Administrasi dan Dokumentasi 1.000 Ls
5 Penyediaan Air Kerja 1.000 Ls

II PEKERJAAN GALIAN
1 Galian Tanah Pondasi 118.400 m³
2 Urugan Tanah Kembali 29.600 m³
3 Urugan Pasir di Bawah Pondasi 14.800 m³

III PEKERJAAN PASANGAN DAN PLESTERAN


1 Pekerjaan Anstamping 22.200 m³
2 Pasangan Pondasi Batu Karang (1 pc : 4 psr) 77.330 m³
3 Pasangan Tembok Biasa (1 pc : 5 psr) 10.931 m²
4 Plesteran (1 pc : 5 psr) 61.379 m²
5 Acian 61.379 m²
6 Pasangan Batu Roster 36.000 Bh

IV PEKERJAAN BETON
1 Pek. Sloof dan Ringbalk 15/20 Camp. 1 Pc : 2 Ps : 3 Kr 4.440 m³
2 Pek. Cor Beton Neut Camp. 1 Pc : 3 Ps : 5 Kr 0.006 m³
3 Pek. Rabat Lantai Camp. 1 Pc : 3 Ps : 5 Kr 7.400 m³
4 cakar ayam 9.400
5 kolom 30 x 30 20.563
6 ring balk 0,3 x 0,6 11.520
7 Pek. Kolom Praktis 15/15 Camp. 1 Pc : 2 Ps : 3 Kr 1.232 m³
8 Pek. Cor lantai o,12 m 36.000 m³
10 Pek. Cor tangga 1.200 m³
11 ring balk 20 x 25 11.100 m³
V PEKERJAAN PINTU DAN JENDELA
1 Pekerjaan Kusen Type P1 0.042 m³
2 Pekerjaan Kusen Type P2 0.114 m³
3 Pekerjaan Kusen Type J1 0.144 m³
4 Pekerjaan Daun Pintu Type P1 3.010 m²
5 Pekerjaan Daun Pintu Type P2 4.620 m²
6 Pekerjaan Daun Jendela Type J1 3.040 m²

VI PEKERJAAN KUDA-KUDA DAN LISTPLANK


1 Pek. Kuda - Kuda baja ringan 0.462 m³
2 Pek.penutup atap galfalum 1.119 m³
3 Pek. Lisplank Kayu 2,5/18 Kayu Kelas II 114.280 m'

VII PASANGAN ATAP DAN PLAFOND


1 Pas. Atap Seng BJLS 0.30 mm 468.00 m²
2 Pas. Atap Bubungan Seng Licin 0.30 mm 36.00 m'
3 Pas. Plafond Tripleks 2,88 mm & Rangka 360.00 m²
4 Pas. List Penutup Plafond (Berprofil) 139.98 m'
VIII PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 40/40 360.00 m²
2 Pasangan Tegel Plint 10/30 51.10 m'
IX PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Double Slaag 4 Buah
2 Pasangan Grendel Pintu 4 Buah
3 Pasangan Grendel Jendela 4 Buah
4 Pasangan Engsel Pintu 15 Buah
5 Pasangan Engsel Jendela 8 Buah
6 Pasangan Kait Angin 8 Buah
7 Pasangan Anker Kusen Pintu Jendela ø 12 mm 40 Buah

X PEKERJAAN CAT
1 Cat Tembok 61.38 m²
2 Cat Plafond 360.00 m²
3 Cat Listplank 20.57 m²
4 Cat Atap Seng 113.76 m²

XI PEKERJAAN INSTALASI LISTRIK DAN AIR


1 Pekerjaan Instalasi Kabel 7 Buah
2 Pasangan Lampu SL 25 Watt 6 Buah
3 Pasangan Lampu SL 10 Watt 1 Buah
4 Pasangan Saklar Tunggal 3 Buah
5 Pasangan Saklar Ganda 1 Buah
6 Pasangan Stop Kontak 4 Buah
7 Pasangan Kotak Sekring 1 Buah
8 Pasangan Bak Air Viber 1 Buah
9 Pasangan Closed Jongkok 1 Buah
10 Instalasi Air Bersih 1 Ls
11 Instalasi Air Kotor 1 Ls
12 Pasangan Floor Drain 1 Buah
13 Pasangan Kran Air 1/2" 1 Buah

XII PEKERJAAN SEPTICTANK DAN PERESAPAN


1 Pekerjaan Galian 16.40 m³
2 Urugan Pasir 3.50 m³
3 Urugan Batu Pecah/Kerikil 0.30 m³
4 Pasangan Batu Kosong 0.97 m³
5 Lapisan Ijuk 21.60 m²
6 Pasangan Trasraam 3.59 m²
7 Urugan Tanah 0.86 m³
8 Pekerjaan Beton 0.59 m³
9 Pekerjaan Plesteran 8.55 m²
10 Pekerjaan Acian 8.55 m²
ANALISA TENAGA KERJA
I. PEKERJAAN PERSIAPAN
1. 1 m1 Pemasangan Bowplank
pekerja = 0.1000 x 1.000 / 6 = 0.017 orang
tukang kayu = 0.1000 x 1.000 / 6 = 0.017 orang
kepala tukang = 0.0100 x 1.000 / 6 = 0.002 orang
mandor = 0.0050 x 1.000 / 6 = 0.001 orang

II. PEKERJAAN TANAH DAN URUGAN


1. Galian Tanah pondasi
pekerja = 0.7500 x 118.400 / 6 = 14.800 orang
mandor = 0.0250 x 118.400 / 6 = 0.493 orang
2. Urugan Tanah Kembali
pekerja = 0.5000 x 29.600 / 6 x 2 = 4.933 orang
mandor = 0.0500 x 29.600 / 6 x 2 = 0.493 orang
3. Urugan Pasir Di Bawah Pondasi
pekerja = 0.3000 x 14.800 / 6 = 0.740 orang
mandor = 0.0100 x 14.800 / 6 = 0.025 orang
4. Urugan Pasir Peninggi Lantai
pekerja = 0.3000 x Err:509 / 6 x 2 = Err:509 orang
mandor = 0.0100 x Err:509 / 6 x 2 = Err:509 orang
TOTAL :
pekerja = Err:509 orang
Tukang kayu = 0.0167 orang
kepala tukang = 0.0017 orang
mandor = Err:509 orang

III. PEKERJAAN PASANGAN DAN PLESTERAN


1. 1 m3 Pasangan Aanstamping
pekerja = 0.7800 x 22.200 / 6 = 2.886 orang
tukang batu = 0.3900 x 22.200 / 6 = 1.443 orang
kepala tukang = 0.0390 x 22.200 / 6 = 0.144 orang
mandor = 0.0390 x 22.200 / 6 = 0.144 orang
2. 1 m3 Pasangan Pondasi Batu Karang (1pc : 5psr)
pekerja = 1.5000 x 77.330 / 6 x 2 = 38.665 orang
mandor = 0.0750 x 77.330 / 6 x 2 = 1.933 orang
tukang batu = 0.6000 x 77.330 / 6 x 2 = 15.466 orang
kepala tukang = 0.0600 x 77.330 / 6 x 2 = 1.547 orang
3. 1 m2 Pasangan Tembok Trasraam (1pc : 3psr)
pekerja = Err:509 x Err:509 / 6 x 2 = Err:509 orang
mandor = Err:509 x Err:509 / 6 x 2 = Err:509 orang
tukang batu = Err:509 x Err:509 / 6 x 2 = Err:509 orang
kepala tukang = Err:509 x Err:509 / 6 x 2 = Err:509 orang
4. 1 m2 Pasangan Tembok Biasa (1pc : 5psr)
pekerja = 0.3200 x Err:509 / 6 x 3 = Err:509 orang
mandor = 0.0150 x Err:509 / 6 x 3 = Err:509 orang
tukang batu = 0.1000 x Err:509 / 6 x 3 = Err:509 orang
kepala tukang = 0.0100 x Err:509 / 6 x 3 = Err:509 orang
5. 1 m2 Plesteran Tembok Trasraam (1pc : 3psr)
pekerja = Err:509 x Err:509 / 6 = Err:509 orang
mandor = Err:509 x Err:509 / 6 = Err:509 orang
tukang batu = Err:509 x Err:509 / 6 = Err:509 orang
kepala tukang = Err:509 x Err:509 / 6 = Err:509 orang
6. 1 m2 Plesteran Tembok Biasa (1pc : 5psr)
pekerja = 0.2000 x 61.379 / 6 x 2 = 4.092 orang
mandor = 0.0100 x 61.379 / 6 x 2 = 0.205 orang
tukang batu = 0.1500 x 61.379 / 6 x 2 = 3.069 orang

RAB 2007
RALNO_ @ CVL
kepala tukang = 0.0150 x 61.379 / 6 x 2 = 0.307 orang

RAB 2007
RALNO_ @ CVL
7. 1 m2 Plesteran Pondasi Tepi Luar (1pc : 4psr)
pekerja = Err:509 x Err:509 / 6 = Err:509 orang
mandor = Err:509 x Err:509 / 6 = Err:509 orang
tukang batu = Err:509 x Err:509 / 6 = Err:509 orang
kepala tukang = Err:509 x Err:509 / 6 = Err:509 orang
8. 1 m2 Acian Tembok
pekerja = Err:509 x 61.379 / 6 x 3 = Err:509 orang
mandor = Err:509 x 61.379 / 6 x 3 = Err:509 orang
tukang batu = Err:509 x 61.379 / 6 x 3 = Err:509 orang
kepala tukang = Err:509 x 61.379 / 6 x 3 = Err:509 orang

TOTAL :
pekerja = Err:509 orang
mandor = Err:509 orang
tukang batu = Err:509 orang
kepala tukang = Err:509 orang

IV. PEKERJAAN BETON :


1. 1 m3 Pasangan Beton Sloof (1pc : 2psr : 3krl)
pekerja = 4.8500 x 4.440 / 6 x 3 = 10.767 orang
mandor = 0.1750 x 4.440 / 6 x 3 = 0.389 orang
tukang batu = 0.3500 x 4.440 / 6 x 3 = 0.777 orang
tukang besi = 1.4000 x 4.440 / 6 x 3 = 3.108 orang
tukang kayu = 1.5600 x 4.440 / 6 x 3 = 3.463 orang
kepala tukang batu = 0.3310 x 4.440 / 6 x 3 = 0.735 orang
kepala tukang besi = 0.3310 x 4.440 / 6 x 3 = 0.735 orang
kepala tukang kayu = 0.3310 x 4.440 / 6 x 3 = 0.735 orang
2. 1 m3 Pasangan Beton Kolom Praktis (1pc : 2psr : 3krl)
pekerja = 7.3000 x 1.232 / 6 x 3 = 4.496 orang
mandor = 0.2500 x 1.232 / 6 x 3 = 0.154 orang
tukang batu = 0.3500 x 1.232 / 6 x 3 = 0.216 orang
tukang besi = 2.1000 x 1.232 / 6 x 3 = 1.293 orang
tukang kayu = 3.3000 x 1.232 / 6 x 3 = 2.033 orang
kepala tukang batu = 0.5700 x 1.232 / 6 x 3 = 0.351 orang
kepala tukang besi = 0.5700 x 1.232 / 6 x 3 = 0.351 orang
kepala tukang kayu = 0.5700 x 1.232 / 6 x 3 = 0.351 orang
3 1 m3 Pasangan Beton Kolom Teras (1pc : 2psr : 3krl)
pekerja = 7.3000 x Err:509 / 6 = Err:509 orang
mandor = 0.2500 x Err:509 / 6 = Err:509 orang
tukang batu = 0.3500 x Err:509 / 6 = Err:509 orang
tukang besi = 2.1000 x Err:509 / 6 = Err:509 orang
tukang kayu = 3.3000 x Err:509 / 6 = Err:509 orang
kepala tukang batu = 0.5700 x Err:509 / 6 = Err:509 orang
kepala tukang besi = 0.5700 x Err:509 / 6 = Err:509 orang
kepala tukang kayu = 0.5700 x Err:509 / 6 = Err:509 orang
4 1 m3 Pasangan Beton Ringbalk (1pc : 2psr : 3krl)
pekerja = 4.8500 x Err:509 / 6 x 3 = Err:509 orang
mandor = 0.1750 x Err:509 / 6 x 3 = Err:509 orang
tukang batu = 0.3500 x Err:509 / 6 x 3 = Err:509 orang
tukang besi = 1.4000 x Err:509 / 6 x 3 = Err:509 orang
tukang kayu = 1.5600 x Err:509 / 6 x 3 = Err:509 orang
kepala tukang batu = 0.3310 x Err:509 / 6 x 3 = Err:509 orang
kepala tukang besi = 0.3310 x Err:509 / 6 x 3 = Err:509 orang
kepala tukang kayu = 0.3310 x Err:509 / 6 x 3 = Err:509 orang

RAB 2007
RALNO_ @ CVL
5 1 m3 Pasangan Beton Meja Dapur (1pc : 2psr : 3krl)
pekerja = Err:509 x Err:509 / 6 = Err:509 orang
mandor = Err:509 x Err:509 / 6 = Err:509 orang
tukang batu = Err:509 x Err:509 / 6 = Err:509 orang
tukang besi = Err:509 x Err:509 / 6 = Err:509 orang
tukang kayu = Err:509 x Err:509 / 6 = Err:509 orang
kepala tukang batu = Err:509 x Err:509 / 6 = Err:509 orang
kepala tukang besi = Err:509 x Err:509 / 6 = Err:509 orang
kepala tukang kayu = Err:509 x Err:509 / 6 = Err:509 orang
6 1 m3 Pasangan Beton Neut (1pc : 2psr : 3krl)
pekerja = 1.6500 x Err:509 / 6 = Err:509 orang
mandor = 0.0800 x Err:509 / 6 = Err:509 orang
tukang batu = 0.2500 x Err:509 / 6 = Err:509 orang
kepala tukang batu = 0.0250 x Err:509 / 6 = Err:509 orang

TOTAL :
pekerja = Err:509 orang
mandor = Err:509 orang
tukang batu = Err:509 orang
tukang besi = Err:509 orang
tukang kayu = Err:509 orang
kepala tukang batu = Err:509 orang
kepala tukang besi = Err:509 orang
kepala tukang kayu = Err:509 orang

V. PEKERJAAN KAYU DAN KACA :


1. 1 m3 Pasangan Kayu Kosen Klas I (Bayam)
pekerja = Err:509 x 0.042 / 6 x 3 = Err:509 orang
mandor = Err:509 x 0.042 / 6 x 3 = Err:509 orang
tukang kayu = Err:509 x 0.042 / 6 x 3 = Err:509 orang
kepala tukang kayu = Err:509 x 0.042 / 6 x 3 = Err:509 orang
2. 1 m2 Pasangan Daun Pintu Panil Kayu
pekerja = 1.0000 x 0.114 / 6 = 0.019 orang
mandor = 0.0500 x 0.114 / 6 = 0.001 orang
tukang kayu = 2.5000 x 0.114 / 6 = 0.048 orang
kepala tukang kayu = 0.2500 x 0.114 / 6 = 0.005 orang
3. 1 m2 Pasangan Daun Pintu Double Teacwood
pekerja = Err:509 x Err:509 / 6 = Err:509 orang
mandor = Err:509 x Err:509 / 6 = Err:509 orang
tukang kayu = Err:509 x Err:509 / 6 = Err:509 orang
kepala tukang kayu = Err:509 x Err:509 / 6 = Err:509 orang
4. 1 m2 Pasangan Daun Pintu Double Teacwood Lapis Seng
pekerja = Err:509 x Err:509 / 6 = Err:509 orang
mandor = Err:509 x Err:509 / 6 = Err:509 orang
tukang kayu = Err:509 x Err:509 / 6 = Err:509 orang
kepala tukang kayu = Err:509 x Err:509 / 6 = Err:509 orang
5. 1 m2 Pasangan Daun Jendela Kaca & Ventilasi 3mm
pekerja = Err:509 x 0.144 / 6 x 3 = Err:509 orang
mandor = Err:509 x 0.144 / 6 x 3 = Err:509 orang
tukang kayu = Err:509 x 0.144 / 6 x 3 = Err:509 orang
kepala tukang kayu = Err:509 x 0.144 / 6 x 3 = Err:509 orang

RAB 2007
RALNO_ @ CVL
6. 1 m1 Pasangan Papan Listplank
pekerja = 0.1000 x 114.280 / 6 x 2 = 3.809 orang
mandor = 0.0050 x 114.280 / 6 x 2 = 0.190 orang
tukang kayu = 0.2000 x 114.280 / 6 x 2 = 7.619 orang
kepala tukang kayu = 0.0250 x 114.280 / 6 x 2 = 0.952 orang
7. 1 m3 Pasangan Kayu Kap dan Gording
pekerja = 4.0000 x 0.462 / 6 x 3 = 0.925 orang
mandor = 0.2000 x 0.462 / 6 x 3 = 0.046 orang
tukang kayu = 12.0000 x 0.462 / 6 x 3 = 2.774 orang
kepala tukang kayu = 1.2000 x 0.462 / 6 x 3 = 0.277 orang

TOTAL :
pekerja = Err:509 orang
mandor = Err:509 orang
tukang kayu = Err:509 orang
kepala tukang kayu = Err:509 orang

VI. PEKERJAAN ATAP DAN PLAFOND :


1. 1 m2 Pasangan Atap Seng BJLS 0.30 mm
pekerja = 0.1200 x 468.000 / 6 x 2 = 18.720 orang
tukang kayu = 0.0600 x 468.000 / 6 x 2 = 9.360 orang
kepala tukang kayu = 0.0060 x 468.000 / 6 x 2 = 0.936 orang
mandor = 0.0060 x 468.000 / 6 x 2 = 0.936 orang
2. 10 m1 Pasangan Bubungan Atap Seng Licin BJLS 0.30 mm
pekerja = 0.1500 x 36.000 / 6 = 0.900 orang
mandor = 0.0080 x 36.000 / 6 = 0.048 orang
tukang kayu = 0.0700 x 36.000 / 6 = 0.420 orang
kepala tukang kayu = 0.0080 x 36.000 / 6 = 0.048 orang
3. 1 m2 Pasangan Plafond Tripleks & Rangka
pekerja = 0.2700 x 360.000 / 6 x 3 = 48.600 orang
mandor = 0.0135 x 360.000 / 6 x 3 = 2.430 orang
tukang kayu = 0.4000 x 360.000 / 6 x 3 = 72.000 orang
kepala tukang kayu = 0.0100 x 360.000 / 6 x 3 = 1.800 orang
4. 1 m1 List Plafond Profil
pekerja = 0.0500 x 139.980 / 6 = 1.167 orang
mandor = 0.0025 x 139.980 / 6 = 0.058 orang
tukang kayu = 0.0500 x 139.980 / 6 = 1.167 orang
kepala tukang kayu = 0.0050 x 139.980 / 6 = 0.117 orang

TOTAL :
pekerja = 69.3865 orang
mandor = 3.4723 orang
tukang kayu = 82.9465 orang
kepala tukang kayu = 2.9007 orang

RAB 2007
RALNO_ @ CVL
VII. PEKERJAAN LANTAI
1. 1 m2 Pasangan Tegel Keramik 30 x 30 cm
pekerja = 0.2500 x 360.000 / 6 x 3 = 45.000 orang
mandor = 0.0125 x 360.000 / 6 x 3 = 2.250 orang
tukang batu = 0.1200 x 360.000 / 6 x 3 = 21.600 orang
kepala tukang batu = 0.0120 x 360.000 / 6 x 3 = 2.160 orang
2. 1 m2 Pasangan Tegel Mozaik 30 x 30 cm
pekerja = 0.2500 x Err:509 / 6 = Err:509 orang
mandor = 0.0125 x Err:509 / 6 = Err:509 orang
tukang batu = 0.1200 x Err:509 / 6 = Err:509 orang
kepala tukang batu = 0.0120 x Err:509 / 6 = Err:509 orang
3. 1 m1 Pasangan Tegel Plint 10 x 30 cm
pekerja = 0.0900 x 51.100 / 6 = 0.767 orang
mandor = 0.0045 x 51.100 / 6 = 0.038 orang
tukang batu = 0.0900 x 51.100 / 6 = 0.767 orang
kepala tukang batu = 0.0090 x 51.100 / 6 = 0.077 orang
4. 1 m2 Pasangan Tegel Porselin 10 x 20 cm
pekerja = Err:509 x Err:509 / 6 x 2 = Err:509 orang
mandor = Err:509 x Err:509 / 6 x 2 = Err:509 orang
tukang batu = Err:509 x Err:509 / 6 x 2 = Err:509 orang
kepala tukang batu = Err:509 x Err:509 / 6 x 2 = Err:509 orang

TOTAL :
pekerja = Err:509 orang
mandor = Err:509 orang
tukang batu = Err:509 orang
kepala tukang batu = Err:509 orang

VIII. PEKERJAAN INSTALASI LISTRIK DAN AIR


1. 1 Buah kloset Jongkok
pekerja = 1.0000 x #NAME? / 6 = #NAME? orang
mandor = 0.1600 x #NAME? / 6 = #NAME? orang
tukang batu = 1.5000 x #NAME? / 6 = #NAME? orang
kepala tukang batu = 1.5000 x #NAME? / 6 = #NAME? orang
2. 1 Buah Wastavel
pekerja = Err:509 x #NAME? / 6 = Err:509 orang
mandor = Err:509 x #NAME? / 6 = Err:509 orang
tukang batu = Err:509 x #NAME? / 6 = Err:509 orang
kepala tukang batu = Err:509 x #NAME? / 6 = Err:509 orang
3. 1 Buah Bak Air Porselin
pekerja = 2.1000 x #NAME? / 6 = #NAME? orang
mandor = 0.1100 x #NAME? / 6 = #NAME? orang
tukang batu = 0.7500 x #NAME? / 6 = #NAME? orang
kepala tukang batu = 0.0700 x #NAME? / 6 = #NAME? orang
4. 1 Buah Kran Air
pekerja = 0.0100 x #NAME? / 6 = #NAME? orang
mandor = 0.0050 x #NAME? / 6 = #NAME? orang
tukang batu = 0.1000 x #NAME? / 6 = #NAME? orang
kepala tukang batu = 0.0100 x #NAME? / 6 = #NAME? orang
5. 1 Buah Floor Drain
pekerja = 0.0100 x #NAME? / 6 = #NAME? orang
mandor = 0.0050 x #NAME? / 6 = #NAME? orang
tukang batu = 0.1000 x #NAME? / 6 = #NAME? orang
kepala tukang batu = 0.0100 x #NAME? / 6 = #NAME? orang

TOTAL :
pekerja = #NAME? orang
mandor = #NAME? orang
tukang batu = #NAME? orang

RAB 2007
RALNO_ @ CVL
kepala tukang batu = #NAME? orang

RAB 2007
RALNO_ @ CVL
IX. PEKERJAAN FINISHING
1. 1 m2 Cat Tembok + Plamir
pekerja = 0.0200 x Err:509 / 6 x 3 = Err:509 orang
mandor = 0.0025 x Err:509 / 6 x 3 = Err:509 orang
tukang cat = 0.0630 x Err:509 / 6 x 3 = Err:509 orang
kepala tukang cat = 0.0063 x Err:509 / 6 x 3 = Err:509 orang
2. 1 m2 Cat Plafond
pekerja = 0.0200 x Err:509 / 6 = Err:509 orang
mandor = 0.0025 x Err:509 / 6 = Err:509 orang
tukang cat = 0.0630 x Err:509 / 6 = Err:509 orang
kepala tukang cat = 0.0063 x Err:509 / 6 = Err:509 orang
3. 10 m2 Mengecat Kayu Kilap
pekerja = 0.0700 x Err:509 / 6 x 2 = Err:509 orang
mandor = 0.0025 x Err:509 / 6 x 2 = Err:509 orang
tukang cat = 0.0090 x Err:509 / 6 x 2 = Err:509 orang
kepala tukang cat = 0.0060 x Err:509 / 6 x 2 = Err:509 orang
4. 1 m2 Teak Oil
pekerja = Err:509 x Err:509 / 6 = Err:509 orang
mandor = Err:509 x Err:509 / 6 = Err:509 orang
tukang cat = Err:509 x Err:509 / 6 = Err:509 orang
kepala tukang cat = Err:509 x Err:509 / 6 = Err:509 orang
5. 1 m2 Mengecat Seng
pekerja = Err:509 x Err:509 / 6 = Err:509 orang
mandor = Err:509 x Err:509 / 6 = Err:509 orang
tukang cat = Err:509 x Err:509 / 6 = Err:509 orang
kepala tukang cat = Err:509 x Err:509 / 6 = Err:509 orang

TOTAL :
pekerja = Err:509 orang
mandor = Err:509 orang
tukang cat = Err:509 orang
kepala tukang cat = Err:509 orang

RAB 2007
RALNO_ @ CVL
X. PEKERJAAN PENGGANTUNG DAN PENGUNCI
1. 1 Buah Engsel
pekerja = 0.0150 x #NAME? / 6 = #NAME? orang
mandor = 0.0008 x #NAME? / 6 = #NAME? orang
tukang kayu = 0.1500 x #NAME? / 6 = #NAME? orang
kepala tukang kayu = 0.0150 x #NAME? / 6 = #NAME? orang
2. 1 Buah Kait Angin
pekerja = 0.0150 x #NAME? / 6 = #NAME? orang
mandor = 0.0008 x #NAME? / 6 = #NAME? orang
tukang kayu = 0.1500 x #NAME? / 6 = #NAME? orang
kepala tukang kayu = 0.0150 x #NAME? / 6 = #NAME? orang
3. 1 Buah Pasang Grendel
pekerja = 0.0050 x #NAME? / 6 = #NAME? orang
mandor = 0.0025 x #NAME? / 6 = #NAME? orang
tukang kayu = 0.5000 x #NAME? / 6 = #NAME? orang
kepala tukang kayu = 0.0050 x #NAME? / 6 = #NAME? orang
4. 1 Buah Kunci KM/WC
pekerja = Err:509 x #NAME? / 6 = Err:509 orang
mandor = Err:509 x #NAME? / 6 = Err:509 orang
tukang kayu = Err:509 x #NAME? / 6 = Err:509 orang
kepala tukang kayu = Err:509 x #NAME? / 6 = Err:509 orang
5. 1 Buah Kunci Double Slag
pekerja = 0.0100 x #NAME? / 6 = #NAME? orang
mandor = 0.0050 x #NAME? / 6 = #NAME? orang
tukang kayu = 0.5000 x #NAME? / 6 = #NAME? orang
kepala tukang kayu = 0.0100 x #NAME? / 6 = #NAME? orang

TOTAL :
pekerja = #NAME? orang
mandor = #NAME? orang
tukang kayu = #NAME? orang
kepala tukang kayu = #NAME? orang

IX. PEKERJAAN LAIN - LAIN


1 m1 Saluran Keliling
pekerja = 0.0360 x 16.398 / 6 = 0.098 orang
mandor = 0.0018 x 16.398 / 6 = 0.005 orang
tukang batu = 0.0600 x 16.398 / 6 = 0.164 orang
kepala tukang batu = 0.0060 x 16.398 / 6 = 0.016 orang

TOTAL :
pekerja = 0.098 orang
mandor = 0.005 orang
tukang batu = 0.164 orang
kepala tukang batu = 0.016 orang

RAB 2007
RALNO_ @ CVL
PERHITUNGAN VOLUME PEKERJAAN
TUGAS : RENCANA ANGGARAN BIAYA
PEKERJAAN : SMK MUHAMMDIYAH BELIK

HASIL PERHITUNGAN
NO URAIAN PEKERJAAN SKETSA/GAMBAR URAIAN PERHITUNGAN VOLUME PEKERJAAN KET
M¹ M² M³ Ls Bh/Unit
1 2 3 4 5 6 7 8 9 10
11.00
I PEKERJAAN PERSIAPAN Pembersihan lokasi
1 Pembersihan Lokasi 3.75 1.000 diambil lebih lebar 1 m
dari daerah
8.00 pembangunan
4.25

9.00

2 Pemasangan Papan Nama Proyek 1.000

3 Pengukuran dan Bowplank Gedung 1.000

4 Administrasi dan Dokumentasi 1.000

5 Penyediaan Air Kerja 1.000

II PEKERJAAN GALIAN
1 Galian Tanah Pondasi Luas = t x l 148.000 0.800 118.400 36
= 0,80 m¹ x 1,00 m¹ 36
0.80 = 0,80 m² 36
Volume = p x luas 8
= 41,75 m¹ x 0,80 m² 8
1.00 = 33,40 m³ 8
8
8
2 Urugan Tanah Kembali Volume = 1/4 x volume galian 148.000 29.600 148
= 1/4 x 33,40 m³
= 8,35 m³
0.80

1.00
3 Urugan Pasir di Bawah Pondasi Luas = t x l 148.000 0.100 14.800
= 0,10 m¹ x 1,00 m¹
= 0,10 m²
0.10
Volume = p x luas
= 41,75 m¹ x 0,10 m²
= 4,175 m³
1.00

4 Err:509 2.85 3.85 1.85 Luas = L1 + L2 + L3 + L4 148.000 29.600


L4 1.60 = ( 2,85 m¹ x 5,85 m¹ ) + ( 3,85 m¹ x 3,35 m¹ ) +
3.35 L2 = ( 2,35 m¹ x 3,85 m¹ ) + ( 1,85 m¹ x 1,60 m¹ )
5.85 L1 = 41,578 m²
Volume = Luas x t
L3 2.35
= 41,578 m² x 0,20 m¹
2.85 3.85 = 8,316 m³

0.20

5 Err:509 Luas = Luas Urugan Pasir Bawah Lantai 148.000 59.200


0.40 Volume = Luas x t
= 41,481 m² x 0,40 m¹
= 16,631 m³

III PEKERJAAN PASANGAN & PLESTERAN


1 Pekerjaan Anstamping Luas = t x l 148.000 0.150 22.200
= 0,15 m¹ x 1,00 m¹
0.15 = 0,15 m²
Volume = p x luas
= 41,75 m¹ x 0,15 m²
= 6,263 m³
1.00

2 Pasangan Pondasi Batu Karang (1 pc : 4 psr) 0.30 Luas = (( a + b ) / 2 ) * t 148.000 0.523 77.330
= (( 0,30 m¹ + 0,80 m¹ ) / 2 ) x 0,95 m¹
= 0,523 m²
0.95 Volume = p x luas
= 41,75 m¹ x 0,523 m²
= 21,814 m³

0.80

3 Pasangan Tembok Biasa (1 pc : 5 psr) 0.15 Luas Sirkulasi = 14,14 L1 = t = 4,35


Luas = L1 + L2 - Luas Sirkulasi 148.000 4.000 592.000 L2 = t = 3,85
= ( 11,25 m¹ x 4,35 m¹ ) + ( 28,25 m¹ x 3,85 m¹ ) -
14,14 m² = 14,14 m²
Variasi
4 Pasangan Tembok Gewel (1 pc : 5 psr) Luas 1 = ( 1/2 x a x t ) x jumlah 10.931 3 buah
1 = ( 1/2 x 2,65 m¹ x 1,35 m¹ ) x 6 bh
1.35 = 10,733 m²
Luas 2 = ( 1/2 x a x t ) * jumlah 1 buah
2.65 = ( 1/2 x 1,20 m¹ x 0,33 m¹ ) x 1 bh
2 = 0,198 m²
0.33 Luas Total = L1 + L2
= 10,733 m² + 0,198 m² = 10,931 m²
1.20

5 Pasangan Batu Roster Luas = p x l x jumlah 1.440 36.000


= 0,20 m¹ x 0,20 m¹ x 36 bh
0.20
= 1,44 m²

0.20

6 Plesteran Tembok biasa (1 pc : 5 psr) 0.15 Luas = ( 2 x Luas pas. Tembok ) + Luas Pas. Gewel 10.931
= ( 2 x 143,56 m² ) + 10,931 m²
= 298,051 m²

Variasi

7 Plesteran Kolom (1 pc : 5 psr) 0.15 Luas = p x l 62.800 9.420


= 62,80 m¹ x 0,15 m¹
= 9,42 m²
Variasi

8 Plesteran Pondasi (1 pc : 5 psr) 0.075 Luas = p x l 30.600 17.595


= 30,60 m¹ x 0,575 m¹
0.50 = 17,595 m²

9 Plesteran Ringbalk & Sloof (1 pc : 5 psr) Luas = p x l 117.167 23.433


= 117,167 m¹ x 0,20 m¹
= 23,433 m²
0.20
0.15
10 Acian Seluruh Bidang Plesteran Luas = 298,051 m² + 9,42 m² + 17,595 m² + 23,433 m² 61.379
= 348,499 m²

Variasi
IV PEKERJAAN BETON BERTULANG
1 Pek. Sloof dan Ringbalk 15/20 Camp. 1 Pc : 2 Ps : Luas = t x l 148.000 0.030 4.440
3 Kr 0.15 = 0,20 m¹ x 0,30 m¹
= 0,030 m²
Volume = p x luas
0.20
= 117,167 m¹ x 0,030 m²
= 3,515 m³

2 Pek. Cor Beton Neut Camp. 1 Pc : 3 Ps : 5 Kr 0.05 Volume = p x l x t x j 0.006


= 0,05 m¹ x 0,10 m¹ x 0,15 m¹ x 8 bh
= 0,006 m³
0.10

3 Pek. Rabat Lantai Camp. 1 Pc : 3 Ps : 5 Kr 2.85 3.85 1.85 Volume = Luas x t 7.400
= 41,578 m² x 0,05 m'
1.60
3.35 = 2,079 m³
5.85

2.35

2.85 3.85

0.15
4 Luas = t x l 54.750 0.023 1.232
Pek. Kolom Praktis 15/15 Camp. 1 Pc : 2 Ps : 3 Kr = 0,15 m¹ x 0,15 m¹
= 0,023 m²
Variasi Volume = p x luas x jumlah kolom
= 54,75 m¹ x 0,023 m²
= 1,232 m³

4 Luas = t x l 360.000 0.100 36.000


= 0,15 m¹ x 0,15 m¹
5 pekerjaan cor lantai = 0,023 m²
Volume = p x luas x jumlah kolom
= 54,75 m¹ x 0,023 m²
= 1,232 m³

6 pkerjaan cor tangga 12.000 0.100 1.200

7 kolom 30 x 30 0.250 0.250 0.063


tinggi 7.000
banyak 47.000 14
329.000 14
20.563 14

8 cakar ayam 47.000 0.200 9.400

0.300 0.600 0.180


9 ring balk 0,3 x 0,6
64.000
11.520

10 ring balk 20 x 25

0.300 0.250 0.075

148.000
11.100

10 ring balk 20 x 25

0.250 0.150 0.038

148.000
5.550
V PEKERJAAN KUSEN PINTU & JENDELA
1 Pekerjaan Kusen Type P1 1.50 Luas = p x l 5.900 3.300 0.042 1.000
= 2,20 m¹ x 1,5 m¹
= 3,30 m²
Volume = p x l x t
2.20 = 5,90 m¹ x 0,06 m¹ x 0,12 m¹
= 0,042 m³

0.05

2 Pekerjaan Kusen Type P2 0.80 Luas = p x l 5.300 1.800 0.038 3.000


= 2,25 m¹ x 0,80 m¹
= 1,80 m²
Volume = p x l x t
2.25 = 5,30 m¹ x 0,06 m¹ x 0,12 m¹
= 0,038 m³

0.05

3 Pekerjaan Kusen Type J1 0.50 Luas = p x l 5.000 1.000 0.036 4.000


= 2,00 m¹ x 0,50 m¹
= 1,00 m²
Volume = p x l x t
2.00
= 5,00 m¹ x 0,06 m¹ x 0,12 m¹
= 0,036 m³

0.05

4 Pekerjaan Daun Pintu Type P1 1.40 Luas = p x l 3.010 0.090 1.000


= 2,15 m¹ x 1,40 m¹
= 3,010 m²
Volume = luas x t
2.15 = 3,01 m¹ x 0,03 m¹
= 0,090 m³

5 Pekerjaan Daun Pintu Type P2 0.70 Luas = p x l 1.540 0.046 3.000


= 2,20 m¹ x 0,70 m¹
= 1,54 m²
Volume = luas x t
2.05 = 1,54 m¹ x 0,03 m¹
= 0,046 m³

Pekerjaan Daun Jendela Type J1 0.40 Luas = p x l


6 0.760 0.014 4.000
= 1,90 m¹ x 0,40 m¹
= 0,76 m²
1.90
Volume = luas x t
= 4,6 m¹ x 0,03 m¹ x 0,1 m¹
= 0,046 m³

VI PEKERJAAN KUDA-KUDA DAN LISTPLANK


1 Pek. Kuda - Kuda baja ringan 1.96 Volume = p x l x t 64.220 0.007 0.462

4.63
1.97
1.23
1.31

Rangka Plafon Usuk 5/7


+ 3.20

6.15
METODE PELAKSANAAN PEKERJAAN 

TUGAS : RENCANA ANGGARAN BIAYA


PEKERJAAN : SMK MUHAMMDIYAH BELIK
### ###

Sebelum pekerjaan dimulai akan dilakukan pembersihan lapangan sebagaimana mestinya


dengan membuang semua sampah ke penampungan dan mengatur persiapan area kerja.
Semua sampah harus dibuang ke penampungan. Hal-hal yang perlu dipastikan (khususnya
sampah kimia dan kontaminasi biologi) yang dapat membahayakan pekerjaan dan orang
lain sekitarnya..

1.        LINGKUP PEKERJAAN


Lingkup pekerjaan yang akan dilaksanakan yakni :
1.      Pekerjaan persiapan
2.      Pekerjaan tanah dan galian
3.      Pekerjaan pasangan dan plesteran
4.      Pekerjaan beton
5.      Pekerjaan kayu dan kaca
6.      Pekerjaan atap dan plafond
7.   Pekerjaan lantai dan keramik
8. Pekerjaan penggantung dan pengunci
9. Pekerjaan instalasi listrik
10. Pekerjaan instalasi air
11. Pekerjaan finishing
12. Pekerjaan septiktank dan peresapan

1.2.  PEKERJAAN PENDAHULUAN


1.      Pekerjaan Persiapan
Ø  Sebelum pekerjaan dimulai akan dilakukan pembersihan lapangan sebagaimana
mestinya dengan membuang semua sampah ke penampungan dan mengatur
Ø  persiapan area kerja.
Semua sampah harus dibuang ke penampungan. Hal-hal yang perlu dipastikan
(khususnya sampah kimia dan kontaminasi biologi) yang dapat membahayakan
pekerjaan dan orang lain sekitarnya.
Ø  Mempersiapkan ruang kantor di lapangan ( Direksi Keet ) untuk Pelaksana dan
Konsultan Pengawas, gudang Matrial dan alat,Barak Pekerja Pos Jaga  dan
fasilitas sanitasi yang baik di lapangan dan terpeliharanya selama masa
konstruksi.
Ø  Menjaga lapangan dari orang-orang yang tidak berkepentingan, untuk itu
diperlukan pagar pembatas.
Ø  Pembuatan WC , Penngadaan air bersih dan listrik sementara dan fasilitas lainnya
untuk kebutuhan para pekerja.
Ø  Mempersiapkan papan Nama Proyek untuk dipasang di lokasi pekerjaan.
Ø  Melakukan uji matrial seperti test beton, test tanah, test baja dan test comisioning,
setelah dilakukan pengetesan tersebut lalu dibawa ke laboratorium untuk diteliti
apakan matrial tersebut layak dipakai atau sebaliknya.
Ø  Pada pekerjaan pondasi menggunakan  jenis Konstruksi Sarang Laba Laba
(KSLL)  dikerjakan oleh perusahaan  PT.Katama Surya Bumi        ( perusahaan
yang memiliki hak Paten )  selaku sub kontraktor seperti yang telah ditentukan.
Ø  Segala sesuatunya menyangkut kelancaran pekerjaan palaksanaan harus telah
disiapkan di lokasi sebelum melaksanakan pekerjaan.
Ø  Jadwal terinci, Time schedule, mobilisasi peralatan dan tenaga kerja,serta
kelengkapan administrasi lapangan harus disiapkan sebelum memulai pekerjaan.
Ø  Demi kelancaran kegiatan sebelumnya kontraktor harus memperhatikan
penempatan bahan / material dan lalu lintas.
Ø  Situasi dan Ukuran-ukuran
Ø  Volume pekerjaan tersebut dalam pasal terdahulu merupakan batasan minimal
yang harus dipenuhi dan dimaksudkan sebagai garis pelaksanaan dan pegangan
Ø  kontraktor.
Kontraktor wajib meneliti situasi lapangan, terutama keadaan tanah, sifat dan
luasan pekerjaan serta hal-hal lain yang dapat mempengaruhi harga penewaran
kontraktor.
Ø  Kelalaian atau kekurangan telitian kontraktor dalam hal ini tidak dijadikan alasan
untuk mengajukan tuntutan.

Ukuran
Ø  Kontraktor Bertanggung jawab atas tepatnya pelaksanaan pekerjaan menurut
bentuk ukuran-ukuran dan mutu yang tercantum dalam rencana kerja dan Syarat-
syarat (RKS) pekerjaan ini.
Ø  Kontraktor berkewajiban mencocokkan ukuran-ukuran satu sama lain dan segera
melaporkan kepada Direksi bilamana terdapat ketidak cocokan ukuran-ukuran
didalam gambar-gambar RKS ini, dan tidak diperkenangkan membetulkan
kesalahan-kesalahan ukuran / gambar-gambar sebelum berkonsultasian dari
Direksi.
Ø  Apabila terdapat ketidak sesuaian ukuran-ukuran, maka pengukuran bersama
dijadikan patokan.
Ø  Letak titik duga (titik nol) sebagaimana  dinyatakan  dalam gambar atau sesuai
kesepakatan dalam peninjauan lokasi.
Ø  Titik peil ini harus ditetapkan dengan membuat patok permanen yang selama
dalam pelaksanaan tidak boleh bergesar/berubah.
Ø  Untuk selanjutnya patok permanen tersebut harus menjadi dasar bagi setiap
ukuran dan kedalaman.
Ø  Atas persetujuan Direksi, penentuan titik lainnya dilakukan oleh pemborong
dilapangan dengan alat ukur optic yang sudah diTera kebenarannya dan harus
selalu berpedoman pada titik duga patok (peil nol).
Ø  Untuk Bangunan rehabilitasi sebelum kontraktor memulai pekerjaan terlebih
dahulu mengambil Foto Nol.
Pekerjaan Pembersihan
Ø  Sebagai langkah awal peleksanaan pekerjaan, Kontraktor membersihkan
lapangan/Lokasi pembangunan dari hal-hal yang dapat merusak pelaksanaan
pembanguna.
Ø  Penebangan pohon/pembersihan harus tuntas sampai pada akar-akarnya
sehingga tidak merusak struktur tanah.
Ø  Memasang Papan Bouwplank
Ø  Pemasangan patok dan papan bouwplank boleh menggunakan kayu/papan kls.III
yang diketam rata pada sisi kerjanya.
Ø  Tinggi bouwplank sama dengan titik nol atau apabila dikehendaki lain harus
dibicarakan dan mendapat persetujuan dengan Direksi.
Ø  Setelah pemasangan bouwplank harus dilaporkan kepada Direksi untuk
mendapatkan persetujuan sebelum pekerjaan selanjutnya dilaksanakan.

1.3.  PEKERJAAN TANAH

Penjelasan Umum

Pekerjaan ini meliputi penimbunan kembali galian pondasi, penimbunan rencana lantai
bangunan, penggalian, pemadatan lapis demi lapis, sehingga titik peil sesuai dengan
gambar rencana.

Ketentuan-ketentuan dalam melaksanakan pekerjaan seperti yang dijelaskan sebagai


berikut :

Untuk pekerjaan tanah pertama dilakukan galian tanah pada tempat yang telah
ditentukan pada gambar. Untuk penimbunan tanah didalam  bangunan, tanah setelah
digali dapat diurug kembali pada lobang-lobang bekas galian sesaui petunjuk dari
Direksi.

Penimbunan dengan lapisan pasir Dengan ketebalan 4 cm dilakukan secara teknis


yaitu harus dilakukan lapis demi lapis, dimana setiap lapisnya 20 cm lalu disiram
hingga betul-betul basah kemudian dipadatkan dengan alat pemadat  selam 4 kali
pemadatan begitulah seterusnya hinga mencapai ketinggian yang direncanakan
kemudian diatasnya ditutup dengan kerikil.

Pemadatan dilakukan dengan alat pemadat mesin ringan (stamper) sampai kepadatan
yang diinginkan tercapai. Setelah selesai dilakukan pekerjaan pemadatan akan
dilakukan pengetesan kepadatan.
a. Galian Tanah

Ø  Sebelum melaksanakan penggalian, posisi galian dan ukuran seperti tertera dalam
gambar sudah dipastikan benar dan harus mendapat persetujuan Direksi /
Pengawas lapangan.
Ø  Penggalian tanah pondasi dapat dimulai setelah pemasangan bouwplank dan
patok-patok disetujui Direksi / Pengawas lapangan.
Ø  Dasar galian harus mencapai tanah keras, dan jika pada galian terdapat akar-akar
kayu, kotoran-kotoran dan bagian-bagian tanah yang longgar (tidak padat), maka
bagian ini harus dikeluarkan seluruhnya kemudian lubang yang terjadi diisi dengan
pasir urug.
Ø  Untuk mempertahankan kepadatan muka tanah galian, maka lubang yang sudah
siap segera dilanjutkan dengan urugan pasir dan batu kosong.

b. U r u g a n

Pekerjaan urugan yang dilaksanakan adalah urugan pasir, urugan tanah dan
urugan kembali eks tanah galian sesuai dengan gambar kerja.

1.4.  PEKERJAAN STRUKTUR

1.      Pekerjaan Pondasi


1.        Penjelasan Umum
Meliputi pemasangan pondasi bangunan yang dicantumkan dalam gambar diikuti
berdasarkan tinggi peil dan dimensi ukuran dan berdasarkan petunjuk Direksi /
Pengawas
2.        Lingkup
Pondasi yang dipasang berasal dari material batu gunung yang bermutu baik yang
tidak mengandung lumpur.
Ketentuan-ketentuanPondasi yang dipasang berasal dari material batu gunung
yang bermutu baik yang tidak mengandung lumpur.
Ketentuan-ketentuan dalam melaksanakan pekerjaan seperti yang dijelaskan sebagai
berikut :
Ø  Pasangan pondasi batu kosong tebalnya dibuat minimum 20 cm atau sesuai
gambar rencana.
Ø  Untuk pondasi dipakai batu gunung yang berkualitas baik, keras, tidak polos dan
permukaannya tajam. Batu gunung yang dipakai harus dipecah-pecah sehingga
diameternya antar 30 cm dan minimum 10 cm. Pasangan batu gunung untuk
pondasi ini harus dipasang dengan adukan 1PC : 4 psr yang diaduk matang.
Ukuran kedalaman, dan lebar pondasi batu gunung dibuat sesuai gambar
rencana.
Ø  Batu gunung harus disusun sedemikian rupa sehingga dudukannya kokoh serta
terikat baik satu sam lainnya dengan adukan. Untuk keperluan kemudahan
pemasangan pipa saluran air bersih, air hujan kabel-kabel dan lain-lain yang
menembus pondasi dapat dipasang bahan lunak yang mudah dibuka. Dimensi
pondasi batu gunung disesuaikan dengan gambar rencana. Tidak diperkenangkan
melakukan pelubangan pada sloef dan pondasi.
2.      Pekerjaan Beton

Pekerjaan Beton meliputi :


Cor Kolom Praktis beton bertulang Camp. 1:2:3
Cor Sloof beton bertulang Camp. 1:2:3
Cor Ringbalk beton bertulang Camp. 1:2:3
Pek. Cor Beton Neut Camp. 1:3:5
Pek. Rabat Lantai Camp. 1:3:5

Beton bertulang digunakan untuk konstruksi sloof dan ring balik, kolom, dan bagian-
bagian yang ditentukan dalam gambar.
Beton yang digunakan adalah campuran 1 Pc : 2 Ps : 3 Kr dan 1 Pc : 3 Ps : 5 Kr.
Semua beton digetarkan dengan baik pada saat diisikan kedalam cetakan.
Bahan-bahan beton terdiri dari pasir untuk bangunan dan pasir untuk beton dengan
komposisi sbb :
0,15 mm    -     2,0 mm    + 35 %
2,0 mm    -    4,0 mm    + 15 %
4,0 mm    -    16,0 mm    + 30 %
16,0 mm    -     31,5 mm    + 20 %

Semen yang digunakan harus satu merek produksi untuk seluruh pekerjaan konstruksi,
kontraktor tidak diperbolehkan menggunakan semen yang sudah mengalami
pengerasan  akibat umur penyimpanan yang terlalu lama. Penyimpanan PC digudang
harus kering dan aman diatas papan terletak 30 cm diatas muka tanah.

Air untuk adukan beton harus memakai air bersih yan bisa diminum, tidak bergaram
(PH air +7). Tidak diperkenankan memakai air sumuran yang kotor dan mengandung
garam.

Air berkualitas baik, tidak payau, bersih dari endapan, bahan organic, garam, asam,
basa alkali, limbah atau hal lain yang tidak murni. Air yang berkloride tidak
diperkenankan untuk mencampur beton bertulang.

Pengecoran beton hanya dapat dilaksanakan atas persetujuan tertulis direksi. Selama
pengecoran berlangsung pekerja dilarang berdiri dan berjalan-jalan diatas penulangan.
Untuk dapat sampai ketempat-tempat yang sulit dicapai harus digunakan papan-papan
berkaki yang tidak membebani tulangan. Kaki-kaki tersebut harus sudah dapat dicabut
pada saat beton dicor.

Pasang angkur dan lain-lain yang akan menjadi satu dengan beton bertulang dan dicor
pada saat yang bersamaan.
Diperhatikan juga tempat klos-klos untuk kosen atau instalasi.
Beton yang sudah dicor harus dijaga agar tidak kehilangan kelebaban untuk paling
sedikit 14 (empat belas) hari.
Perbaikan muka beton pada saat pembongkaran bekesting/mal yang perlu diperhatikan
adalah penambahan pada daerah yang kurang sempurna, kropos dengan campuran
adukan semen (cemen mortar) setelah pembukaan acuan, hanya boleh dilakukan
setelah mendapat persetujuan dan sepengetahuan Direksi/Pengawas.

Pengangkutan adukan beton dari tempat pengaduan ke tempat pengecoran harus


dilakukan dengan cara yang disetujui oleh direksi, yaitu :
Ø  Tidak berakibat pemisahanan kehilangan bahan-bahan.
Ø  Tidak terjadi perbedaan waktu pengikat yang menyolok antara beton yang sudah
dicor dan yang akan dicor, dan nilai slump untuk berbagai pekerjaan beton harus
memenuhi tabel 4.4.1SK SNI T-15.1991.03.
Ø  Pengadukan pengecoran harus menggunakan Concrete Mixer.
Ø  Kontraktor harus memberikan Jaminan atas kemampuannya membuat kualitas
beton dengan memperhatikan data-data pelaksanaan dilain tempat atau dengan
mengadakan trial-mixer dilaboratorium yang ditunjuk oleh Direksi/Pengawas
lapangan.

Mutu beton dan mutu pelaksanaan dianggap memenuhi syarat apabila dipenuhi syarat-
syarat yaitu tidak boleh lebih dari 1 nilai diantara 3 nilaii hasil pemeriksaan benda uji
berturut-turut dan tidak boleh satupun nilaii rata-rata dari 3 hasil pemeriksaan benda uji
berturut-turut berkurang.

Lingkup pekerjaan beton meliputi penyediaan semua pemasangan, Sloef. Kolom,


kolom praktis dan semua komponen-konponenya yang ditunjuk oleh gambar rencana.

Ketentuan-ketentuan dalam melaksanakan pekerjaan seperti yang dijelaskan sebagai


berikut :

Bahan
a.       Portland camen
Ø  Portland cament yang digunakan adalah jenis-jenis yang memenuhi
ketentuan-ketentuan dalam N1-1 atau menurut standart Portland cemen yang
digariskan oleh Asosiasi Semen Indonesia.
Ø  Semen yang digunakan harus berkualitas baik dan pada saat digunakan
harus dalam keadaan fresh (belum mulai mengeras)
Ø  Untuk menjaga mutu semen,cara penyimpanan harus mengikuti syarat-syarat
penyimpangan bahan tersebut.
b.       Air
Yang digunakan harus memenuhi syarat-syarat PBI 1971. Air tawar yang dipakai
harus bersih, tidak mengandung minyak, asam alkali bahan-bahan organis dan
bahan-bahan lain yang dapat menurungkan mutu beton.
c.      Kerikil/Batu Pecah
Ø  Kerikil/batu pecah yang dipakai harus memenuhi syarat-syarat PBI 1971.
Ø  Kerikil/batu pecah harus mempunyai gradasi yang baik, tidak porous,
memenuhi syarat kekerasannya.
Ø  Kerikil tidak boleh mengandung lumpur lebih dari 1% ditentukan terhadap
berat kering. Apabila kadar lumpur melampaui 1%, maka kerikil harus dicuci.

d.       Pasir
Ø  Pasir yang dipakai harus memenuhi syarat-syarat PBI 1971.
Ø  Pasir yang dipakai dapat berupa pasir alam, atau pasir buatan yang
dihasilkan oleh alat-alat pemecah batu. Pasir harus terdiri dari butir-butir yang
tajam dan mempunyai gradasi yang baik, tidak porous cukup syarat
kekerasannya.
Ø  Pasir tidak boleh mengandung lumpur lebuh dari 5% ditentukan terhadap
berat kering.
e.       Besi Beton
Ø  Baja tulangan yang digunakan adalah baja yang kualitasnya sesuai dengan
ditentukan dalam PBI 71.
Ø  Besi beton harus bersih dari dari lapisan minyak lemak, karat dan bebas dari
cacat-cacat seperti serpih dan sebagainya, serta berpenampang bulat.
Ø  Dimensi dan ukuran penempang bulat besi beton / baja tulangan harus
sesuai dengan petujuk gambar kerja (memenuhi batas toleransi minimal)
seperti yang di syaratkan dalam PBI 71.
Ø  Besi beton / baja tulangan yang tidak memenuhi syarat harus segera
dikeluarkan dari lokasi pekerjaan dalam waktu 24 jam setelah ada perintah
Ø  tertulis dari Direksi.
Kawat pengikat harus terbuat daru baja lunak dengan diameter minimal 1mm
dan tidak bersepuh seng.
f.       Kayu
Ø  Kayu yang digunakan harus bersifat baik dengan ketentuan bahwa segala
sifat dan kekurangan-kekurangan yang berhubungan dengan pemakainya
tidak akan merusak atau mengurangi nilai konstruksi.
Ø  Kualitas dan ukuran kayu yang digunakan disesuaikan dengan gambar kerja
yang ada. Demikian pula dengan mutu dan kelas kuat kayu yang apabila
tidak ditentukan lain, maka harus mengikuti syarat-syarat dan ketentuan-
ketentuan dalam PPKI NI-5.
Ø  Dihindarkan adanya cacat-cacat kayu antara lain yang berupa putih kayu,
pecah-pecah, mata kayu yang melintang. Syarat-syarat kelembaban dan
toleransi ukuran kayu yang dipakai harus memenuhi syarat-syarat dan
ketentuan dalam PPKI.
1.      Pekerjaan Besi beton
Ø  Ukuran-ukurannya diameter besi beton yang terpasang harus sesuai dengan
gambar rencana, sedangkan perubahan diameter tulangan harus dengan
persetujuan Direksi/Pengawas. Penggatian diameter tulangan tidak
diperkenankan.
Ø  Besi beton bekas dan yang sudah berkarat tidak diperkenankan dipakai dalam
konstruksi. Besi beton harus bebas dari sisik, karat dan lain-lain lapisan yang
dapat mengurangi daya lekatnya pada beton.
Ø  Ikatan besi beton harus rapih dan kuat, bahan untuk pengikat adalah kawat beton
dengan diameter minimum 1mm.
Ø  Untuk mendapatkan jaminan akan kualitas besi yang diminta, maka disamping
adanya sertifikat dari pabrik, juga diminta harus ada sertifikat dari laboratorium.
2.      Berkesting dan Acuan
Ø  Sebelum penulangan beton dikerjakan harus terlebih dahulu dibuat bekesting atau
pun acuan yang kokoh dan rapat, sehingga air semen tidak bocor.
Ø  Bekesting harus dibuat sesuai dengan ukuran beton yang akan dilaksanakan.
Ø  Bahan bekesting dapat dibuat dari kayu terenteng tebal 2 cm atau multiplex.
Ø  Pembukaan bekesting ataupun acuan harus teratur dan beton sudah berumur
minimal 14 (empat belas) hari.
3.      Pengecoran Beton
Ø  Beton tidak bertulang/beton tumbuk/ rabat beton dibuat dengan adukan. 1PC :  3
Psr : 5krl dipergunakan untuk lantai kerja, lantai alas keramik untuk lantai kerja,
lantai alas keramik, neut-kusen dan rabat beton, ukuran disesuaikan dengan
gambar.
Ø  Adukan beton harus benar-benar rata dan matang dengan menggunakan Ready
Mix pada K-225.
Ø  Untuk beton konstruksi bermutu K-175 dapat dilakukan dengan cara manual.
Ø  Pengecoran beton dapat dilakukan setelah cara pemasangan pembesian disetujui
oleh Direksi Pelaksanaan secara tertulis dan tersedian cukup bahan, perlatan
serta tenaga kerja.

3.      Pekerjaan Pasangan Batako


Pasangan batako dipasangan dengan rapi tegak lurus  dan water pass dengan spesi 1
s/d 1 ½ cm, bata yang akan digunakan berkualitas baik, cukup masak yang merata
tidak mudah patah.
Pemasangan dinding bata mulai dari permukaan sloof  hingga peil + 0,20 dipasang
tembok  ½ batu dengan campuran 1 Pc : 5 Ps . Dinding bata untuk bagian sanitasi
dilaksanakan hingga ketinggian 160 cm di atas lantai pada dinding KM/WC.
4.      Pekerjaan Plasteran

Plesteran harus dikerjakan pada seluruh dinding dalam dan luar dari lantai sampai ke
batas plafon. Plesteran harus rapi serta rata halus pada seluruh permukaan. Ketebalan
plesteran pada semua bidang permukaan harus sama tebal. Ketebalan berkisar antara
1,00 cm sampai 1,50 cm.
Sebelum pekerjaan plesteran dimulai akan dilakukan penyiraman pada dinding bata
supaya plesteran lebih kuat dan tidak retak.
Trassram dipakai campuran 1 Pc : 2 Ps dilakukan pada seluruh pasangan bata
dibawah lantai dan diatas lantai hingga 20 cm atau pada KM/WC dipasang setinggi 160
cm, baik pada bagian luar maupun
bagian dalam. Semua dinding kecuali dinding trassram, diplester dengan campuran 1
Ps : 4 Ps. Kuda-Kuda Dan Atap
5.      Pekerjaan

Pekerjaan konstruksi rangka atap harus dari bahan/ material yang bermutu baik,
pekerja yang terampil dan berpengalaman untuk mendapatkan hasil yang baik.

Pekerjaan ini meliputi pekerjaan kuda-kuda, gording, atap penutup dan seluruh detail
yang disebutkan / ditunjuk dalam ganbar rencana untuk mendapatkan hasil yang baik
sesuai dengan petunjuk Direksi / Pengawas.

Ketentuan-ketentuan dalam melaksanakan pekerjaan seperti yang dijelaskan sebagai


berikut :
Ø  Bahan atap yang dipakai adalah atap seng gelombang dan bubungan seng datar
dengan kualitas Baik stadart SNI atau sesuai petunjuk Direksi Pelaksana.
Pemasangan atap harus sesuai dengan petunjuk teknis pemakaian bahan
tersebut yang dikeluarkan oleh pabrik pembuatnya.
Ø  Untuk rangka atap menggunakan Kayu Kls II sesuai dengan syarat-syarat,
Sambungan-sambungan dilengkapi beugel / mur / baut / plat penyampung sesuai
Ø  gambar rencana.
Balok Gording menggunakan kayu Kls II
Ø  Listplank kayu harus memakai bahan papan Kayu Kelas-II dengan ukuran 2,5/18
cm.
6.     Pekerjaan kusen,rangka atap dan plafon

Pekerjaan Kusen :
Kusen pintu dan jendela menggunakan Kayu kelas I dengan ukuran yang telah
ditentukan pada gambar, pemasangan kusen dilakukan dengan menempatkan pada
titik sesuai gambar, pemasangan dilakukan dengan mengunakan alat ukur seperti
water pass, pemasangan kusen harus tegak lurus dan siku, antara satu kusen dengan
kusen lain harus sejajar.
Pekerjaan Plafond :
Bahan untuk plafon menggunakan matrial tripleks tebal 2,88 mm, dengan rangka kayu
5/7 cm
Pemasangan Plafon dipasang dengan datar dan menggunakan water pass dan siku .
tripleks dipasang setelah pekerjaan istalasi kabel kabel listrik terpasang.
Jarak penggantung plafon akan ditentukan sesuai standar pabrik yang memprodukti
matrial tersebut.
Setiap pertemuan pemasangan tripleks dengan dinding akan dipasang profill dengan
motif yang telah ditentukan.

7.     Pekerjaan Lantai

Dibawah lantai, sub lapisan kerikil yang padat (8-16 mm) dengan ketebalan
minimal 5 cm harus dihamparkan guna menghindari lembab di bawah lantai.
Untuk pekerjaan pengecoran lantai cor dipakai campuran 1 Pc : 3 Ps : 5 Kr
dengan ketebalan 15 cm dan Aci halus permukaannya. Untuk beton tumbuk 1 Pc :
3 Ps : 5 Kr dan diplester dengan campuran 1 Pc : 5 Ps. Setelah pekerjaan
pengecoran lantai dasar kemudian dilakukan pemasangan keramik dengan ukuran
yang telah ditentukan pada gbr .

Lantai yang dipergunakan berkualitas baik sesuai gambar rencana atau petunjuk
direksi / konsultan pengawas.

Ketentuan-ketentuan dalam melaksanakan pekerjaan seperti yang dijelaskan


sebagai berikut :
Ø  Pemasangan Lantai sesuai dengan petunjuk Direksi Pelaksana.
Ø  Pekerjaan pemasangan ubin lantai baru diperkenankan untuk dipasang
setelah semua Pekerjaan-pekerjaan dinding/plesteran dan plafond telah
selesai dikerjakan. Sebelum pemasangan keramik lantai, harus direndam
dalam air sampah jenuh.
Ø  Lantai keramik yang dipasang tidak boleh ada cat berupa : retak-retak,
gelombang-gelombang, berlubang, noda, permukaan cembung atau cekung.
Sisi ubin keramik harus siku, penyimpangan kesikuan ubin tidak boleh lebih
besar dari 0,5 cm setiap jarak 10 cm ke kanan dank ke kiri.
Ø  Bahan lantai gedung digunakan keramik 60 x 60 cm sedangkan pada jenis
keramik kualitas KW 1, Warna keramik disesuaikan dengan petunjuk Direksi.

Ø  Pemasangan ubin keramik harus dikerjakan oleh tukang kayu yang benar-
benar ahli dan harus menghasilkan penyelesaian yang rapih dan naad yang
lurus. Naad harus didisi dengan bahan grouting / pasta semen / okker yang
warnanya disesuiakan dengan warna ubin yang dipakai. Pengisian naad
dilakukan paling cepat 24 jam setelah tegel/ubin keramik dipasang serta
celah-celah keramik atau satu sama lain harus dibersihkan terlebih dahulu
dari kotoran yang menghambat masuknya cairan bahan  pengisi. Segera
setelah pengisian naad dengan semen, permukaan lantai  harus segera
Ø  Pemasangan keramik yang tidak rapih, bergelombang, naad tidak lurus dan
sebagainya akibat dari pemasangan yang tidak baik harus dibongkar/diganti
sehingga memuaskan Direksi.
8.     Pekerjaan Instalasi Listrik

Pekerjaan intalasi listrik dilakukan oleh pekerja yang ahli dibidang ini  dan
mendapat izin oleh Perusahaan Listrik Negara ( PLN ) pada daerah setempat.

Pekerjaan Elektrikal meliputi semua sisitem instalasi listri atau penerangan secara
komplik sehingga berfungsi secara baik.Kawat atau kabel yang akan dipasang
yang berkualitas ,     adapun bahan bahan yang akan digunakan sebagai berikut :
-    Lampu SL 25 WATT PHILIP
-    Lampu SL 10 WATT PHILIP
-    Stop kontak
-    MCB 32 Amp 1 bh
-    Panel Listrik
-    Saklar Tunggal
-    Saklar ganda

Lingkup Pekerjaan listrik ini meliputi penyediaan seluruh material,


perlengkapan/peralatan dan melaksanakan seluruh pekerjaan system listrik sehingga
dapat beropersai secara sempurna.
Seluruh pekerjaan instalasi listrik yang akan dilaksanakan harus dikerjakan oleh
instalatur yang sudah berpengalaman serta terdaftar sebagai instalatur resmi PLN
dengan memegang SPT dan Surat Izin Kerja- SIKA C yang masih berlaku. Seluruh
Pekerjaan listrik harus dikerjakan sesuai peraturan pekerjaan listrik yang berlaku di
Indonesia terutama SPLN dan PUIL.
Ø  Lingkup Pekerjaan listrik meliputi pengadaan dan pemasangan semua komponen
listrik termasuk lampu, saklar, stop kontak, instalasi pengkabelan lengkap conduit,
panel listrik dan pengetesannya.
Ø  Hasil pekerjaan listrik sampai menyala.

Ketentuan-ketentuan dalam melaksanakan pekerjaan seperti yang dijelaskan sebagai


berikut :
Ø  Kontraktor Pelaksana harus memasang lampu jenis merk Philips atau setara. Tipe
armature aotbow lengkap dengan aksesorisnya, serta lampu lainnya seperti yang
ditujukkan dalam gambar..
Ø  Semua stop kontak, saklar dari kualitas terbaik atau dari sekualitas merk MK atau.
Ø  Isolasi untuk sambungan kabel digunakan pipa isolasi sekualias 3 M, legrand atau
yang sekualitas.
Ø  Pipa kabel (conduit) dari jenis high-impact dari merk EGA, clipsall atau yang
sekualitas. Sambungan (copling), T-Dos harus dengan merk yang sama dengan 
jenis konduitnya.
Ø  Seluruh material yang dipergunakan harus baru dan dipasang dengan cara
penempatan yang benar atau dari material bangunan lama yang masih layak/baik
dapat dipasang dengan persetujuan pihak Direksi/Pengawas.
Kontraktor Pelaksana harus menyerahkan contoh dari seluruh material Pekerjaan listrik
untuk mendapatkan persetujuan dari Direksi sebelum dipasang. Seluruh biaya
ditanggung atas biaya Kontraktor pelaksana. Material yang harus diajukan contohnya
antara lain :
Ø  Kabel,
Ø  Stop kontak,
Ø  Saklar,
Ø  Lampu (setiap jenisnya),
Ø  Konduit, Ballast, dll

Ketentuan-ketentuan dalam melaksanakan pekerjaan seperti yang dijelaskan sebagai


berikut :
Ø  Pipa kabel (konduit) dari jenis high-impact dari merk EGA, clipsall atau sekualitas.
Sambungan (copling), T-Dos harus dengan merk yang sama dengan jenis
Ø  konduitnya.
Seluruh material yang dipergunakan harus baru dan dipasang dengan cara
penempatan yang benar atau dari material bangunan lama yang masih layak/baik
dapat dipasang dengan persetujuan pihak Direksi/pengawas.

Kontraktor Pelaksana harus menyerahkan contoh dari seluruh material Pekerjaan listrik
untuk mendapatkan persetujuan dari Direksi sebelum dipasang. Seluruh biaya
ditanggung atas biaya kontraktor pelaksana. Material yang harus diajukan contohnya
antara lain : Pipa, Konduit, Ballast, dll.

9.     Pekerjaan Pintu Dan Jendela

Pekerjaan  pintu dan jendela terbuat dari kayu kelas I, ukuran sesuai gambar dari
gambar,  serta  tidak terdapat cacat yang akan mengurangi kekuatan serta keindahan
konstruksi.
Pintu/jendela panel terbuat dari kayu kelas I, sedangkan tebal pintu dan jendela
disesuaikan dengan gambar.
Pintu dipasang dengan dua buah engsel secara baik, dimana tinggi antara lantai
dengan pintu 1 cm.
Setiap daun pintu dipasang dua buah engsel, dengan bukaan dua arah kesebelah kiri
dan kanan.
Kaca untuk jendela dipasang kaca reben dengan ketebalan 5 mm. Pasangan kaca
harus memperhatikan muai susut baik dari kusen, maupun bahan kaca tersebut.

10.   Pekerjaan Cat

Sebelum dilakukan pengecatan terlebih dahulu didempul kalau pada kayu


menggunakan dempul kayu dan pada beton menggunakan plamur , setelah itu
diamplas sehingga permukaan yang akan dicat rata dan terbebas dari lubang lobang
dan pori-pori
Setelah pada kayu.
permukaan rata dilakukan pengecatan minimal tiga kali ulang, pengecatan
ulang dilakukan apabila cat lapisan pertama sudah kering.
Cat tembok yang digunakan 2 Jenis yaitu untuk bagian dalam menggunakan merek
Vinyl Arcyle Amulsion sedangkan tembok bagian luar menggunakan merek
Wathershield.
Lingkup pekerjaan ini meliputi seluruh permukaan yang kelihatan seperti yang
disebutkan / ditunjuk dalam gambar untuk mendapatkan hasil yang sesuai dengan
petunjuk Direksi/ konsultan pengawas.
Ketentuan-ketentuan dalam melaksanakan pekerjaan seperti yang dijelaskan sebagai
berikut :
Ø  Sebelum pekerjaan pengecatan dimulai permukaannya harus diberi acian semen
dan dibersihkan dari kotoran. Setelah pekerjaan pembersihan selesai, permukaan
dinding harus digosok dengan amplas kemudian diplamur untuk menutupi bagian-
bagian permukaan tembok berlubang dan yang terdapat celah-celah kemudian
digosok lagi hingga permukaan pekerjaan menjadi halus lalu dicat paling sedikit
tiga kali.
Ø  Untuk Pekerjaan pengecatan kolom menggunakan  cat tembok merk Metrolite
atau setara, warna akan ditentukan kemudian oleh Direksi/ Pengawas.
Ø  List plank dan semua Pekerjaan kayu lainnya dicat menggunakan cat kayu/Besi
sekualitas produk Avian, Glotex atau yang setara.
Ø  Keseluruhan Warna Pengecatan akan ditentukan kemudian oleh
Direksi/Pengawas.
11.  Pekerjaan Sanitasi

Sebelum dipasang pipa pembuang air kotor terlebih dahulu dilakukan penggalian tanah
pada garis pemasangan pipa, pipa kemudian ditanam supaya terhindar dari timpaan
benda-benda lain, sedangkan untuk pemasangan pipa  air bersih ditanam dalam
dinding bata.

Pipa yang digunakan untuk air kotor atau pembuang tinja adalah paralon PVC Ø 4”
yang tebal dan elastis , sedangkan pipa untuk air bersih digunakan pipa PVC Ø 1/2”.
Pada sistem penyambungan lurus pipa tersebut menggunakan socket dan dilem
dengan lem pipa, untuk disambungkan dipasang elbow dan juga menggunakan lem
pipa. Pipa dipasang harus ada kemiringan ke arah pembuangan air.

Pada lobang pembuangan air lantai pada kamar mandi dipasang saringan (floor drain)
supaya tidak masuk kotoran atau binatang kedalam pipa yang bisa mengakibatkan
penyumbatan. Pemasangan kran air pada drat dipasang lem atau isolasi tape khusus
supaya tidak terjadi kebocoran.

Septicktank dibuat pada tempat yang telah ditentukan dengan kapasitas 4,725 m3,
konstruksi dari pada bangunan ini juga dari beton bertulang dengan penutup dari plat
beton, lantai septik tank di pasang susun batu batu koral dan dinding dipasang pipa
pembuang dari WC KM dan pipa pembuang ke resapan, pada ruang resapan pasang
ijuk supaya air kotoran dalam septik tank tidak mudah penuh.

12.   Pekerjaan Pembersihan

Setelah selesai semua pekerjaan, dilakukan pembersihan semua areal kerja baik dari
kayu sisa bekisting, matrial yang menumpuk, sampah-sampah bekas kantong zak
semen dan membongkar semua konstruksi-konstruksi pembantu dalam pekerjaan ini
sampai bersih keseluruhannya.
Sebelum diadakan Serah Terima-1 (Pertama) Pekerjaan, Kontraktoer pelaksana wajib
membersihkan semua bagian Pekerjaan, terutama pada atap, lantai dinding,
pintu/jendela, plafond dan lain-lain. Kontraktor Pelaksana juga harus membersihkan
barang bekas/peralatan yang diperlukan. Semua sisa materialyang digunakan lagi
harus dibawa ke luar dari lingkungan pekerjaan, sehingga halaman benar-benar bersih
dan rapih.

14.  Masa Pemeliharaan

Selama masa pemeliharaan Kontraktor Pelaksana berkewajiban untuk mengganti


material yang tidak berfungsi dengan baik, dan bertanggung jawab atas semua
kekurangan dari item pekerja yang telah dikerjakan.

15.  Ketentuan Tambahan
Ø  Semua pekerjaan yang terdapat dalam gambar bestek tapi tidak dinyatakan dalam
RKS ini atau sebaliknya, akan tetapi menyangkut pekerjaan bangunan ini, maka
pemborong wajib menyelesaikan sesuai petunjuk Pengawas Lapangan / Pihak
Direksi.
Ø  Selain Bestek ringkas ini, semua ketentuan-ketentuan administrasi pemeriksaan
bahan dan mutu pekerjaan serta ketentuan-ketentuan lain dari pemerintah yang
menyangkut pelaksanaan pekerjaan pembangunan termasuk pula sebagai
pedoman penyelenggara pekerjaan yang harus ditaati oleh Rekanan. Satu dan
lain-lain menurut petunjuk Unsur Teknis yang tidak bertentangan dengan uraian
dan syarat-syarat ini.
TIME SCHED
TUGAS : RENCANA ANGGARAN BIAYA
PEKERJAAN : SMK MUHAMMDIYAH BELIK
### #NAME?

TOTAL HARGA BOBOT


NO URAIAN PEKERJAAN
( Rp ) (%)
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 500,000 #NAME?
2 Pasang Papan Nama Proyek 250,000 #NAME?
3 Pengukuran dan Bowplank Gedung 3,000,000 #NAME?
4 Administrasi dan Dokumentasi 2,000,000 #NAME?
5 Penyediaan Air Kerja 1,000,000 #NAME?
II. PEKERJAAN GALIAN
1 Galian Tanah Pondasi 9,324,000 #NAME?
2 Urugan Tanah Kembali 1,702,000 #NAME?
3 Urugan Pasir di Bawah Pondasi 5,794,200 #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
III. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Anstamping 8,378,946 #NAME?
2 Pasangan Pondasi Batu Karang (1 pc : 4 psr) 53,166,695 #NAME?
3 Pasangan Tembok Biasa (1 pc : 5 psr) 113,648,608 #NAME?
4 Plesteran (1 pc : 5 psr) 60,294,016 #NAME?
5 Acian 38,154,400 #NAME?
### #NAME? #NAME? #NAME?
IV. PEKERJAAN BETON
2 Pek. Sloof dan Ringbalk 15/20 Camp. 1 Pc : 2 Ps : 3 Kr 16,919,508 #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
V. PEKERJAAN PINTU DAN JENDELA
1 Pasangan Kusen dan daun almunium 8,000,000 #NAME?
### #NAME? #NAME? #NAME?
3 Pasangan Daun Jendela 17,000,000 #NAME?
VI. PEKERJAAN KUDA-KUDA DAN LISTPLANK
1 Pek. Kuda - Kuda baja ringan 18,648,000 #NAME?
2 Pek.penutup atap galfalum 12,432,000 #NAME?
### #NAME? #NAME? #NAME?
VII. PASANGAN ATAP DAN PLAFOND
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
3 Pas. Plafond Tripleks 2,88 mm & Rangka 13,832,100 #NAME?
4 Pas. List Penutup Plafond (Berprofil) 2,744,308 #NAME?
VIII. PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 40/40 43,941,600 #NAME?
2 Pasangan Tegel Plint 10/30 2,948,879 #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
IX PEKERJAAN CAT
1 Cat Tembok 917,377 #NAME?
2 Cat Plafond 12,947,400 #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
X PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Pekerjaan Instalasi Kabel 350,000 #NAME?
2 Pasangan Lampu SL 25 Watt 330,000 #NAME?
3 Pasangan Lampu SL 10 Watt 700,000 #NAME?
4 Pasangan Saklar Tunggal 52,500 #NAME?
5 Pasangan Saklar Ganda 17,500 #NAME?
6 Pasangan Stop Kontak 70,000 #NAME?
7 Pasangan Kotak Sekring 75,000 #NAME?
8 Pasangan Bak Air Viber 1,310,800 #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME?
RENCANA TOTAL #NAME? #NAME?
RENCANA KOMULATIF -
TIME SCHEDULLE & KURVA S

BULAN I BULAN II BULAN III


1 2 3 4 1 2 3 4 1

#NAME?
#NAME?
#NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME?
#NAME?
#NAME? #NAME?
#NAME?
#NAME?

#NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME?

#NAME? #NAME?

#NAME? #NAME? #NAME? #NAME?


#NAME?
#NAME?
#NAME? #NAME?

#NAME? #NAME?

#NAME? #NAME?
#NAME?
#NAME?

#NAME? #NAME?
#NAME?
#NAME? #NAME?
#NAME? #NAME?

#NAME?
#NAME?
#NAME?
#NAME?

#NAME? #NAME? #NAME?


#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
BULAN III
KET
2 3 4

#NAME? #NAME? #NAME?


#NAME? #NAME?

#NAME?
#NAME?

#NAME?
#NAME?

#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME? #NAME?
#NAME?

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
REKAPITULASI
RENCANA ANGGARAN BIAYA
RENCANA ANGGARAN BIAYA
(RAB)
DAFTAR
ANALISA HARGA SATUAN
DAFTAR
HARGA SATUAN PEKERJAAN
PERHITUNGAN
MATERIAL ON SITE ( M O S )
PERHITUNGAN
ANALISA ANGKUTAN
REKAPITULASI
PERHITUNGAN VOLUME
PERHITUNGAN
VOLUME
METODE
PELAKSANAAN
TIME SCHEDULLE
GAMBAR