REKAPITULASI

DAFTAR KUANTITAS HARGA DAN BAHAN

PEKERJAAN :REHABILITASI BERAT PUSKESMAS


SATUAN KERJA :DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019
2014

NO URAIAN PEKERJAAN TOTAL HARGA

A. DIVISI 1 : PEKERJAAN SITE WORK Rp 155,333,869.38


B. DIVISI 2 : PEKERJAAN STRUKTURAL Rp 901,195,216.48
C. DIVISI 3 : PEKERJAAN ARSITEKTURAL Rp 2,304,407,861.04
D. DIVISI 4 : PEKERJAAN MEKANIKAL Rp 301,868,856.41
E. DIVISI 5 : PEKERJAAN ELEKTRIKAL Rp 282,648,800.13

Real Cost (A + B + C + D + E) Rp 3,945,454,603.45


PPN 10% Rp 394,545,460.34
Jumlah Rp 4,340,000,063.79

Terbilang : Empat Milyar Tiga Ratus Empat Puluh Juta Rupiah

Poso, 03 Juli 2019


Penawar;
CV. WIDYA SEJATI

MAS'UD ABD. KARIM


Direktur
DAFTAR KUANTITAS HARGA DAN BAHAN

SATUAN KERJA :DINAS KESEHATAN KABUPATEN SIGI


PEKERJAAN :REHABILITASI BERAT PUSKESMAS BIROMARU
LOKASI :DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN :2019

Kode HARGA SATUAN JUMLAH HARGA


No URAIAN PEKERJAAN SATUAN VOLUME
ANALISA (Rp) (Rp)
a b c d e f g
I DIVISI 1 : PEKERJAAN SITE WORK
I.1 PEKERJAAN PERSIAPAN
1 An.Prak Pek. Pembuatan Kantor Direksi Di Lapangan Ls 1.00 Rp 5,000,000 Rp 5,000,000.00

2 An.Prak Pek. Pembuatan Papan Proyek Ls 1.00 Rp 200,000 Rp 200,000.00

3 An.Prak Pek. Pembuatan Gudang Dan Barak Pekerja Ls 1.00 Rp 7,000,000 Rp 7,000,000.00

4 An.Prak Pek. Pembongkaran dan Pembersihan Bangunan Eksisting Ls 1.00 Rp 50,000,000 Rp 50,000,000.00

5 An.Prak Mobilisasi Dan Demobilisasi Alat Ls 1.00 Rp 5,000,000 Rp 5,000,000.00

6 An.Prak Pek. Pengukuran Dan Pemasangan Bowplank Ls 1.00 Rp 2,000,000 Rp 2,000,000.00

7 An.Prak K3 Konstruksi Ls 1.00 Rp 5,000,000 Rp 5,000,000.00

8 Pengujian Beton

9 An.Prak Pek. Pagar Pengaman Proyek Ls 1.00 Rp 5,000,000 Rp 5,000,000.00

TOTAL PEKERJAAN PERSIAPAN Rp 79,200,000.00

I.2 PEKERJAAN PEMBERSIHAN LAHAN DAN REMOVAL

1 An.Prak Pek. Pembersihan Awal Lokasi Ls 1.00 Rp 3,500,000 Rp 3,500,000.00

2 An.Prak Pek. Pembersihan Akhir Lokasi Ls 1.00 Rp 2,000,000 Rp 2,000,000.00

TOTAL PEKERJAAN PEMBERSIHAN LAHAN DAN REMOVAL Rp 5,500,000.00

I.3 PEKERJAAN TANAH

A Pekerjaan Tanah Area Pondasi

1 2.3.1.1 Pek. Galian Tanah M3 378.58 Rp 78,802.50 Rp 29,832,892.85

2 2.3.1.8 Pek. Buangan Bekas Galian M3 119.62 Rp 34,513.50 Rp 4,128,649.83

3 2.3.1.9 Pek. Urugan Kembali Bekas Galian M3 258.95 Rp 57,855.00 Rp 14,981,772.10

4 2.3.1.11 Pek. Urugan Pasir (Sloof Dan Pondasi) M3 17.27 Rp 173,109.00 Rp 2,989,730.11

B Pekerjaan Tanah Area Saluran

1 2.3.1.1 Pek. Galian Tanah M3 40.50 Rp 78,802.50 Rp 3,191,107.24

2 2.3.1.8 Pek. Buangan Bekas Galian M3 40.50 Rp 34,513.50 Rp 1,397,624.18

3 2.3.1.11 Pek. Urugan Pasir M3 4.05 Rp 173,109.00 Rp 701,004.90

C Pekerjaan Peninggian Lantai

1 2.3.1.14 Pek. Timbunan Tanah M3 26.96 Rp 195,681.00 Rp 5,276,513.65

2 2.3.1.10 Pek. Pemadatan Tanah M3 26.96 Rp 66,405.00 Rp 1,790,602.50

3 2.3.1.11 Pek. Urugan Pasir M3 36.65 Rp 173,109.00 Rp 6,343,972.03

TOTAL PEKERJAAN TANAH Rp 70,633,869.38

TOTAL ITEM DIVISI 1 : PEKERJAAN SITE WORK Rp 155,333,869.38

II DIVISI 2 : PEKERJAAN STRUKTURAL

A Pekerjaan Kolom 30x30

1 4.1.1.8 Pek. Beton (K-250) M3 5.63 Rp 1,119,908.04 Rp 6,299,482.74

2 4.1.1.17 Pek. Pembesian Kg 236.41 Rp 16,829.79 Rp 3,978,805.57

3 4.1.1.22 Pek. Bekisting M2 75.00 Rp 268,413.95 Rp 20,131,046.25

B Pekerjaan Kolom 25x25

1 4.1.1.8 Pek. Beton (K-250) M3 6.64 Rp 1,119,908.04 Rp 7,437,309.31

2 4.1.1.17 Pek. Pembesian Kg 336.13 Rp 16,829.79 Rp 5,657,080.26

3 4.1.1.22 Pek. Bekisting M2 106.26 Rp 268,413.95 Rp 28,520,592.67

C Pekerjaan Kolom Praktis LT. Dasar

1 4.1.1.35 Pek. Kolom (Termasuk Bekisting Dan Pembesian) M' 435.17 Rp 91,341.55 Rp 39,749,305.29

D Pekerjaan Balok Latai

1 4.1.1.36 Pek. Beton (Termasuk Bekisting Dan Pembesian) M' 138.93 Rp 117,368.78 Rp 16,306,436.45

E Pekerjaan Balok 15x25

1 4.1.1.8 Pek. Beton (K-250) M3 14.15 Rp 1,119,908.04 Rp 15,846,698.81

2 4.1.1.17 Pek. Pembesian Kg 2,175.48 Rp 16,829.79 Rp 36,612,874.89

3 4.1.1.23 Pek. Bekisting M2 245.27 Rp 273,543.95 Rp 67,091,212.80


DAFTAR KUANTITAS HARGA DAN BAHAN

SATUAN KERJA :DINAS KESEHATAN KABUPATEN SIGI


PEKERJAAN :REHABILITASI BERAT PUSKESMAS BIROMARU
LOKASI :DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN :2019

Kode HARGA SATUAN JUMLAH HARGA


No URAIAN PEKERJAAN SATUAN VOLUME
ANALISA (Rp) (Rp)
a b c d e f g
F Pekerjaan Balok 15x20

1 4.1.1.8 Pek. Beton (K-250) M3 7.28 Rp 1,119,908.04 Rp 8,150,690.74

2 4.1.1.17 Pek. Pembesian Kg 1,402.49 Rp 16,829.79 Rp 23,603,633.91

3 4.1.1.23 Pek. Bekisting M2 133.43 Rp 273,543.95 Rp 36,498,969.25

G Pekerjaan Ringbalk Praktis

1 4.1.1.36 Pek. Beton (Termasuk Bekisting Dan Pembesian) M' 56.09 Rp 117,368.78 Rp 6,583,084.71

H Pekerjaan Plat Talang beton

1 4.1.1.8 Pek. Beton (K-250) M3 23.74 Rp 1,119,908.04 Rp 26,589,976.66

2 4.1.1.17 Pek. Pembesian Kg 737.97 Rp 16,829.79 Rp 12,419,908.10

3 4.1.1.23 Pek. Bekisting M2 237.43 Rp 273,543.95 Rp 64,947,540.05

I Pekerjaan Plat Atap

1 4.1.1.8 Pek. Beton (K-250) M3 1.55 Rp 1,119,908.04 Rp 1,736,977.37

2 4.1.1.17 Pek. Pembesian Kg 131.49 Rp 16,829.79 Rp 2,212,898.54

3 4.1.1.23 Pek. Bekisting M2 15.51 Rp 273,543.95 Rp 4,242,666.66

J Pekerjaan Plat Sunscreen Beton

1 4.1.1.8 Pek. Beton (K-250) M3 1.13 Rp 1,119,908.04 Rp 1,261,016.46

2 4.1.1.17 Pek. Pembesian Kg 30.44 Rp 16,829.79 Rp 512,247.26

3 4.1.1.23 Pek. Bekisting M2 14.08 Rp 426,726.70 Rp 6,006,178.30

K Pekerjaan Meja Beton

1 4.1.1.8 Pek. Beton (K-250) M3 0.15 Rp 1,119,908.04 Rp 168,210.19

2 4.1.1.17 Pek. Pembesian Kg 30.65 Rp 16,829.79 Rp 515,885.22

3 4.1.1.23 Pek. Bekisting M2 6.30 Rp 426,726.70 Rp 2,688,378.21

L Pekerjaan Ramp Beton

1 4.1.1.8 Pek. Beton (K-250) M3 0.56 Rp 1,119,908.04 Rp 622,668.87

M Pekerjaan Cor Rabat Lantai Dasar

1 4.1.1.8 Pek. Beton (K-250) M3 34.89 Rp 1,119,908.04 Rp 39,072,471.71

2 4.1.1.1 Pek. Lantai Kerja M3 34.89 Rp 824,305.91 Rp 28,759,208.79

N Pekerjaan Pondasi Poer Plat

1 4.1.1.8 Pek. Beton (K-250) M3 14.05 Rp 1,119,908.04 Rp 15,734,708.00

2 4.1.1.17 Pek. Pembesian Kg 1,714.18 Rp 16,829.79 Rp 28,849,248.39

3 4.1.1.20 Pek. Bekisting M2 37.50 Rp 185,326.95 Rp 6,949,760.63

O Pekerjaan Kolom Pedestal 30x30

1 4.1.1.8 Pek. Beton (K-250) M3 1.35 Rp 1,119,908.04 Rp 1,511,875.86

2 4.1.1.17 Pek. Pembesian Kg 236.41 Rp 16,829.79 Rp 3,978,805.57

3 4.1.1.22 Pek. Bekisting M2 18.00 Rp 416,466.70 Rp 7,496,400.60

P Pekerjaan Kolom Pedestal 25x25

1 4.1.1.8 Pek. Beton (K-250) M3 1.41 Rp 1,119,908.04 Rp 1,579,070.34

2 4.1.1.17 Pek. Pembesian Kg 336.13 Rp 16,829.79 Rp 5,657,080.26

3 4.1.1.22 Pek. Bekisting M2 22.56 Rp 416,466.70 Rp 9,395,488.75

Q Pekerjaan Sloof 15x25

1 4.1.1.8 Pek. Beton (K-250) M3 11.74 Rp 1,119,908.04 Rp 13,145,480.61

2 4.1.1.17 Pek. Pembesian Kg 2,175.48 Rp 16,829.79 Rp 36,612,874.89

3 4.1.1.21 Pek. Bekisting M2 203.46 Rp 145,426.95 Rp 29,588,373.34

R Pekerjaan Sloof 15x20

1 4.1.1.8 Pek. Beton (K-250) M3 6.57 Rp 1,119,908.04 Rp 7,352,196.30

2 4.1.1.17 Pek. Pembesian Kg 1,402.49 Rp 16,829.79 Rp 23,603,633.91

3 4.1.1.21 Pek. Bekisting M2 120.36 Rp 145,426.95 Rp 17,503,345.32

S Pekerjaan Lantai Kerja dan Besi Angkur

1 4.1.1.1 Pek. Lantai Kerja Pondasi M3 3.20 Rp 824,305.91 Rp 2,637,778.90

2 Pek. Besi Angkur Ls 1.00 Rp 5,000,000.00 Rp 5,000,000.00


DAFTAR KUANTITAS HARGA DAN BAHAN

SATUAN KERJA :DINAS KESEHATAN KABUPATEN SIGI


PEKERJAAN :REHABILITASI BERAT PUSKESMAS BIROMARU
LOKASI :DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN :2019

Kode HARGA SATUAN JUMLAH HARGA


No URAIAN PEKERJAAN SATUAN VOLUME
ANALISA (Rp) (Rp)
a b c d e f g
T Pekerjaan Pondasi

1 3.2.1.3 Pek. Pasangan Batu Belah M3 180.06 Rp 756,983.94 Rp 136,302,528.24

2 3.2.1.9 Pek. Pasangan Batu Kosong M3 62.08 Rp 548,824.50 Rp 34,073,110.49

TOTAL ITEM DIVISI 2 : PEKERJAAN STRUKTURAL Rp 901,195,216.48

III DIVISI 3 : PEKERJAAN ARSITEKTURAL

III.1 PEKERJAAN FINISHING DINDING, FASADE DAN INTERIOR

1 4.4.1.10 Pek. Pasangan Dinding 1/2 Bata, Camp. 1Pc : 5 Ps M2 1,556.73 Rp 144,190.51 Rp 224,465,830.60

2 4.4.2.3 Pek. Plesteran Dinding Dan Beton, Campuran 1 Pc : 3 Ps, tebal 15 mm M2 3,315.09 Rp 64,168.07 Rp 212,723,117.03

3 4.4.2.5 Pek. Acian Dinding Dan Beton M2 3,149.86 Rp 37,745.40 Rp 118,892,612.41

4 An. Ter Pek. Dinding Keramik Ukuran 20 X 40 cm Area KM/WC M2 165.24 Rp 296,196.96 Rp 48,942,401.39

5 An.Ter Pek. Aluminium Composite Panel Type Eksterior+ Rangka Besi Hollow (Grey Colour) M2 212.78 Rp 1,005,252.23 Rp 213,897,972.38

6 An.Ter Pek. Aluminium Composite Panel Type Eksterior + Rangka Besi Hollow (White Colour) M2 174.74 Rp 1,005,252.23 Rp 175,654,821.88

7 An.Prak Pek. Papan Nama (Acrylic 5mm) Set 1.00 Rp 15,000,000.00 Rp 15,000,000.00

8 An.Prak Pek. Logo Area Lobby (Acrylic Biru 5mm + Lampu LED) Set 1.00 Rp 8,500,000.00 Rp 8,500,000.00

9 An.Ter Pek. Handrail Koridor (Besi Kotak Stainless Steel) M' 65.00 Rp 380,000.00 Rp 24,700,000.00

10 An.Ter Pek. Grab Holder Kamar Mandi Unit 8.00 Rp 5,027,400.00 Rp 40,219,200.00

11 An.Prak Pek. Signage Room Unit 36.00 Rp 450,000.00 Rp 16,200,000.00

12 An.Prak Pek. Signage Area Unit 10.00 Rp 700,000.00 Rp 7,000,000.00

TOTAL PEKERJAAN FINISHING DINDING, FASADE DAN INTERIOR Rp 1,106,195,955.69

III.2 PEKERJAAN FINISHING LANTAI

1 An.Ter Pek. Homogenous Tile Type Polished Ukuran 60 X 60 cm M2 677.31 Rp 310,328.14 Rp 210,187,111.19

2 An.Ter Pek. Plint Homogenous Tile 10x60 M' 590.98 Rp 66,989.01 Rp 39,588,831.66

3 An.Ter Pek. Tegel Keramik Type Unpolished Ukuran 40 X 40 cm (WC/Kamar Mandi) M2 20.46 Rp 250,196.37 Rp 5,119,017.73

4 An.Ter Pek. Homogenous Tile Type Polished Ukuran 60 X 60 cm (Meja & Bak Cuci) M2 14.73 Rp 310,328.14 Rp 4,569,581.86

5 An.Ter Pek. Batu Sikat Area Ramp M2 4.22 Rp 287,849.05 Rp 1,213,702.85

TOTAL PEKERJAAN FINISHING LANTAI Rp 260,678,245.30

III.3 PEKERJAAN PINTU DAN JENDELA

1 An.Ter Pek. Pintu Dan Jendela (PJ1) + Aksesoris Set 1.00 Rp 12,286,410.20 Rp 12,286,410.20

2 An.Ter Pek. Pintu Dan Jendela (PJ2) + Aksesoris Set 1.00 Rp 11,288,547.17 Rp 11,288,547.17

3 An.Ter Pek. Pintu (P1) + Aksesoris Set 12.00 Rp 9,320,245.97 Rp 111,842,951.59

4 An.Ter Pek. Pintu (P2) + Aksesoris Set 24.00 Rp 5,840,486.98 Rp 140,171,687.63

5 An.Ter Pek. Pintu (P3) + Aksesoris Set 6.00 Rp 9,101,468.67 Rp 54,608,812.02

6 An.Ter Pek. Pintu (P4) + Aksesoris Set 10.00 Rp 4,440,502.76 Rp 44,405,027.59

7 An.Ter Pek. Jendela (J1) + Aksesoris Set 16.00 Rp 5,637,311.56 Rp 90,196,984.92

8 An.Ter Pek. Jendela (J2) + Aksesoris Set 5.00 Rp 3,531,135.69 Rp 17,655,678.45

9 An.Ter Pek. Jendela (J3) + Aksesoris Set 1.00 Rp 8,759,980.52 Rp 8,759,980.52

10 An.Ter Pek. Ventilasi (V1) + Aksesoris Set 2.00 Rp 2,927,250.67 Rp 5,854,501.33

11 An.Ter Pek. Ventilasi (V2) + Aksesoris Set 3.00 Rp 954,203.53 Rp 2,862,610.60

TOTAL PEKERJAAN PINTU DAN JENDELA Rp 499,933,192.03

III.4 PEKERJAAN ATAP DAN LANGIT-LANGIT

1 An.Ter Pek. Atap Gentel Metal + Rangka Baja Ringan M2 772.67 Rp 220,242.87 Rp 170,174,397.63

2 An.Ter Pek. Langit-Langit Gypsum + Rangka Hollow M2 670.20 Rp 174,876.13 Rp 117,201,104.86

3 An.Ter Pek. Drop Ceiling + Rangka Hollow M' 80.73 Rp 127,516.25 Rp 10,294,896.96

4 An.Ter Pek. Langit-Langit Kalsiboard + Rangka Hollow M2 23.62 Rp 155,655.69 Rp 3,676,742.94

5 An.Ter Pek. List Profil Gypsum M' 688.71 Rp 32,921.78 Rp 22,673,555.66

6 An.Ter Pek. Manhole Bh 5.00 Rp 20,172.30 Rp 100,861.50

7 An.Ter Pek. Screed Talang M2 62.97 Rp 60,818.45 Rp 3,829,981.25

TOTAL PEKERJAAN ATAP DAN LANGIT-LANGIT Rp 327,951,540.80


DAFTAR KUANTITAS HARGA DAN BAHAN

SATUAN KERJA :DINAS KESEHATAN KABUPATEN SIGI


PEKERJAAN :REHABILITASI BERAT PUSKESMAS BIROMARU
LOKASI :DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN :2019

Kode HARGA SATUAN JUMLAH HARGA


No URAIAN PEKERJAAN SATUAN VOLUME
ANALISA (Rp) (Rp)
a b c d e f g
III.5 PEKERJAAN PENGECATAN

1 An.Ter Pek. Cat Dinding M2 3,149.86 Rp 29,941.76 Rp 94,312,256.03

2 An.Ter Pek. Cat Langit-Langit M2 693.82 Rp 19,207.86 Rp 13,326,720.59

3 An.Ter Pek. Waterproofing + Grouting (Area Talang Beton) M2 62.97 Rp 31,917.15 Rp 2,009,950.60

TOTAL PEKERJAAN PENGECATAN Rp 109,648,927.23

TOTAL ITEM DIVISI 3 : PEKERJAAN ARSITEKTURAL Rp 2,304,407,861.04

IV DIVISI 4 : PEKERJAAN MEKANIKAL

IV.1 PEKERJAAN SANITARY

1 5.1.1.1 Kloset Duduk Unit 8.00 Rp 3,408,865.05 Rp 27,270,920.40

2 An.Ter Jet Shower Unit 8.00 Rp 503,933.44 Rp 4,031,467.50

3 An.Ter Liquid Soap Dispenser Unit 5.00 Rp 590,206.50 Rp 2,951,032.50

4 An.Ter Wastafel Type Gantung Unit 5.00 Rp 1,846,800.00 Rp 9,234,000.00

5 An.Ter Kran Wastafel Unit 5.00 Rp 372,576.94 Rp 1,862,884.69

6 An.Ter Slop Sink Area Spoel Hoek Unit 1.00 Rp 11,326,470.00 Rp 11,326,470.00

7 An.Ter Kitchen Zinc Unit 4.00 Rp 755,802.90 Rp 3,023,211.60

8 An.Ter Cermin Unit 13.00 Rp 865,602.00 Rp 11,252,826.00

9 An.Ter Kran Air Unit 8.00 Rp 417,749.44 Rp 3,341,995.50

10 5.1.1.36 Floor Drain Unit 8.00 Rp 257,764.69 Rp 2,062,117.50

11 An.Ter Towel Bar Unit 8.00 Rp 216,742.50 Rp 1,733,940.00

12 An.Ter Soap Holder Unit 8.00 Rp 126,967.50 Rp 1,015,740.00

TOTAL PEKERJAAN SANITARY Rp 79,106,605.69

IV.2 PEKERJAAN SUMBER AIR BERSIH

A Pek. Pemasangan Mesin Pompa (Dari RWT Ke KM/WC)

1 An.Ter Mesin Pompa Distribusi (Packaged Booster Pump) Unit 1.00 Rp 7,996,188.00 Rp 7,996,188.00

2 An.Ter Mesin Pompa Transfer (Centrifugal Pump) Unit 1.00 Rp 6,663,197.40 Rp 6,663,197.40

3 An.Ter Gate Valve Bronze dia 25 mm Class 125 Bh 6.00 Rp 1,881,000.00 Rp 11,286,000.00

4 An.Ter Water Level Control Bh 1.00 Rp 262,912.50 Rp 262,912.50

5 An.Ter PP-Pompa Unit 2.00 Rp 3,325,351.50 Rp 6,650,703.00

6 An.Ter Titik Instalasi Daya Pompa Titik 2.00 Rp 366,481.50 Rp 732,963.00

B Pek. Pemasangan Water Tank

1 An.Ter Water Tank Stainless Steel Kapasitas 2500 L + Dudukan Unit 1.00 Rp 11,941,500.00 Rp 11,941,500.00

C Pek. Pemipaan Utama

1 An.Ter Pipa PVC TYPE AW Diameter 1" (Dari Sumber Air ke Tandon) M' 38.60 Rp 32,926.91 Rp 1,270,978.53

2 An.Ter Pipa PVC TYPE AW Diameter 1" (Dari Tandon ke Pipa Cabang) M' 35.30 Rp 32,926.91 Rp 1,162,319.75

3 An.Ter Gate Valve Bronze dia 2" Bh 4.00 Rp 137,227.50 Rp 548,910.00

4 An.Prak Fitting Pipa PVC Type AW Ls 1.00 Rp 444,842.49 Rp 444,842.49

5 An.Prak Civil Work (Galian, Menimbun Kembali Dan Bobokan Dinding) Ls 1.00 Rp 2,500,000.00 Rp 2,500,000.00

TOTAL PEKERJAAN SUMBER AIR BERSIH Rp 51,460,514.67

IV.3 PEKERJAAN INSTALASI AIR BERSIH

1 An.Ter Pipa PVC TYPE AW Diameter 3/4" (Pipa Cabang Ke Outlet) M' 105.00 Rp 27,371.63 Rp 2,874,020.94

2 An.Ter Pipa PVC TYPE AW Diameter 1/2" (Pipa Outlet) M' 84.00 Rp 22,827.82 Rp 1,917,536.54

3 An.Ter Gate Valve Bronze dia 1/2" Bh 8.00 Rp 77,377.50 Rp 619,020.00

4 An.Prak Fitting Pipa PVC Type AW Ls 1.00 Rp 2,021,078.95 Rp 2,021,078.95

5 An.Prak Civil Work (Galian, Menimbun Kembali Dan Bobokan Dinding) Ls 1.00 Rp 2,500,000.00 Rp 2,500,000.00

TOTAL PEKERJAAN INSTALASI AIR BERSIH Rp 9,931,656.43


DAFTAR KUANTITAS HARGA DAN BAHAN

SATUAN KERJA :DINAS KESEHATAN KABUPATEN SIGI


PEKERJAAN :REHABILITASI BERAT PUSKESMAS BIROMARU
LOKASI :DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN :2019

Kode HARGA SATUAN JUMLAH HARGA


No URAIAN PEKERJAAN SATUAN VOLUME
ANALISA (Rp) (Rp)
a b c d e f g
IV.4 PEKERJAAN INSTALASI AIR KOTOR

1 5.1.1.28 Pipa PVC Type AW Diameter 1 1/2" (Dari Wastafel Dan Zinc) M' 7.50 Rp 52,822.76 Rp 396,170.66

2 5.1.1.29 Pipa PVC Type AW Diameter 2" (Dari Wastafel Dan Zinc) M' 72.00 Rp 69,939.86 Rp 5,035,669.56

3 5.1.1.29 Pipa PVC Type AW Diameter 2" (Dari Floor Drain) M' 96.00 Rp 69,939.86 Rp 6,714,226.08

4 5.1.1.31 Pipa PVC Type AW Diameter 3" (Dari Floor Drain) M' 65.00 Rp 96,415.50 Rp 6,267,007.50

5 An.Ter Pipa PVC Type AW Diameter 4" (Dari Kloset) M' 76.00 Rp 171,855.00 Rp 13,060,980.00

6 An.Ter Pipa PVC Type AW Diameter 4" (Ke IPAL) M' 20.00 Rp 171,855.00 Rp 3,437,100.00

7 An.Prak Fitting Pipa PVC Type AW Ls 1.00 Rp 11,015,918.83 Rp 11,015,918.83

8 An.Prak Civil Work (Galian, Menimbun Kembali Dan Bobokan Dinding) Ls 1.00 Rp 2,500,000.00 Rp 2,500,000.00

TOTAL PEKERJAAN INSTALASI AIR KOTOR Rp 48,427,072.63

IV.5 PEKERJAAN INSTALASI AIR HUJAN

1 An.Ter Saluran Air Hujan M' 115.70 Rp 186,383.16 Rp 21,564,531.61

2 An.Ter Roof Drain M' 18.00 Rp 312,502.50 Rp 5,625,045.00

3 5.1.1.31 Pipa PVC Type AW Diameter 3" (Dari Roof Drain) M' 138.00 Rp 96,415.50 Rp 13,305,339.00

4 5.1.1.31 Pipa PVC Type AW Diameter 3" (Dari Saluran Air Hujan Ke Riol Kota) M' 22.00 Rp 96,415.50 Rp 2,121,141.00

5 4.1.1.1 Rabat Beton Pinggir Saluran M3 5.79 Rp 824,305.91 Rp 4,768,609.67

6 2.3.1.11 Pek. Urugan Pasir M3 5.79 Rp 173,109.00 Rp 1,001,435.57

7 5.1.1.17 Bak Kontrol Unit 4.00 Rp 172,824.00 Rp 691,296.00

TOTAL PEKERJAAN INSTALASI AIR HUJAN Rp 49,077,397.85

IV.6 PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH - SEPTIKTANK

1 An.Ter Pek. Septiktank + Pipa Vent Unit 2.00 Rp 10,173,506.35 Rp 20,347,012.70

2 An.Ter Pipa PVC Type AW Diameter 4" (Outlet Ke IPAL) M' 35.00 Rp 171,855.00 Rp 6,014,925.00

3 An.Prak Civil Work (Galian Dan Menimbun Kembali) Ls 1.00 Rp 5,000,000.00 Rp 5,000,000.00

TOTAL PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH Rp 31,361,937.70

IV.7 PEKERJAAN SISTEM TATA UDARA

1 An.Ter Titik Instalasi Daya AC Unit Titik 33.00 Rp 279,969.75 Rp 9,239,001.75

2 An.Ter Stop Kontak AC Bh 33.00 Rp 111,702.90 Rp 3,686,195.70

3 An.Ter Exhaust Fan WC/KM Unit 24.00 Rp 535,800.00 Rp 12,859,200.00

4 An.Ter Titik Instalasi Daya Exhaust Unit Titik 24.00 Rp 279,969.75 Rp 6,719,274.00

TOTAL PEKERJAAN SISTEM TATA UDARA Rp 32,503,671.45

TOTAL ITEM DIVISI 4 : PEKERJAAN MEKANIKAL Rp 301,868,856.41

V DIVISI 5 : PEKERJAAN ELEKTRIKAL

V.1 PEKERJAAN PANEL LISTRIK DAN KABEL FEEDER

1 Pek. Panel Listrik

- An.Ter SDP Unit 1.00 Rp 12,469,606.71 Rp 12,469,606.71

- An.Ter LP Unit 1.00 Rp 7,266,593.70 Rp 7,266,593.70

- An.Ter PP-AC Unit 1.00 Rp 6,926,047.20 Rp 6,926,047.20

2 Pek. Kabel Feeder

- An.Ter Dari SDP ke Sumber Listrik (LVMDP KAWASAN), NYY 4 x 25 mm2 M' 50.00 Rp 263,311.50 Rp 13,165,575.00

- An.Ter Dari SDP ke LP, NYY 4 x 4 mm2 M' 5.00 Rp 71,523.60 Rp 357,618.00

- An.Ter Dari SDP ke PP-AC, NYY 4 x 10 mm2 M' 7.00 Rp 129,891.60 Rp 909,241.20

3 Pek. Rak Kabel

- An.Ter Kabel Tray M' 55.00 Rp 566,979.00 Rp 31,183,845.00

- An.Prak Test Dan Commisioning Ls 1.00 Rp 2,238,800.00 Rp 2,238,800.00

TOTAL PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL Rp 74,517,326.81
DAFTAR KUANTITAS HARGA DAN BAHAN

SATUAN KERJA :DINAS KESEHATAN KABUPATEN SIGI


PEKERJAAN :REHABILITASI BERAT PUSKESMAS BIROMARU
LOKASI :DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN :2019

Kode HARGA SATUAN JUMLAH HARGA


No URAIAN PEKERJAAN SATUAN VOLUME
ANALISA (Rp) (Rp)
a b c d e f g
V.2 PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN

1 An.Ter Saklar Tunggal Bh 37.00 Rp 73,997.40 Rp 2,737,903.80

2 An.Ter Saklar Ganda Bh 9.00 Rp 73,398.90 Rp 660,590.10

3 An.Ter Grid Switch 6 Gang Bh 1.00 Rp 250,554.90 Rp 250,554.90

4 An.Ter Stop Kontak Bh 63.00 Rp 66,875.25 Rp 4,213,140.75

5 An.Ter Stop Lantai Bh 3.00 Rp 543,574.80 Rp 1,630,724.40

6 An.Ter Instalasi penerangan, NYM 3 x 2,5 mm2 + Pipa Conduit Titik 111.00 Rp 224,312.10 Rp 24,898,643.10

7 An.Ter Instalasi stop kontak, NYM 3 x 2,5 mm2 + Pipa Conduit Titik 66.00 Rp 224,312.10 Rp 14,804,598.60

8 An.Ter Downlight 4" + Lampu LED 18 Watt Bh 44.00 Rp 361,095.00 Rp 15,888,180.00

9 An.Ter Downlight 4" + Lampu LED 6 Watt Bh 24.00 Rp 166,582.50 Rp 3,997,980.00

10 An.Ter Lampu RM/TL LED 2x16 Watt Bh 38.00 Rp 662,910.00 Rp 25,190,580.00

11 An.Ter Lampu Baret Bh 1.00 Rp 208,335.00 Rp 208,335.00

12 An.Ter Lampu Hias Bh 1.00 Rp 5,657,631.90 Rp 5,657,631.90

13 An.Ter Lampu Taman Bh 2.00 Rp 2,003,550.00 Rp 4,007,100.00

14 An.Ter Lampu Exit Bh 1.00 Rp 441,750.00 Rp 441,750.00

TOTAL PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN Rp 104,587,712.55

VI.4 PEKERJAAN INSTALASI TATA SUARA

A Pek. Peralatan Utama

1 An.Ter Power Amplifier 1x120 Watt Unit 1.00 Rp 3,462,750.00 Rp 3,462,750.00

2 An.Ter Mic Paging Unit 2.00 Rp 980,400.00 Rp 1,960,800.00

3 An.Ter Mixer Frame Unit 1.00 Rp 6,531,725.53 Rp 6,531,725.53

4 An.Ter Instalasi Daya Alat, NYM 3 x 2,5 mm2 + Pipa Conduit Titik 2.00 Rp 224,312.10 Rp 448,624.20

B Pek. Instalasi

1 An.Ter TBS Unit 1.00 Rp 948,901.80 Rp 948,901.80

2 An.Ter Ceiling Speaker Unit 45.00 Rp 262,200.00 Rp 11,799,000.00

3 An.Ter Column Speaker Unit 10.00 Rp 908,580.00 Rp 9,085,800.00

4 An.Ter Horn Speaker Unit 2.00 Rp 1,342,372.80 Rp 2,684,745.60

5 An.Ter Volume Control Unit 2.00 Rp 224,722.50 Rp 449,445.00

6 An.Ter Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit Titik 57.00 Rp 250,971.00 Rp 14,305,347.00

TOTAL PEKERJAAN INSTALASI TATA SUARA Rp 51,677,139.13

VI.6 PEKERJAAN INSTALASI MATV

A Pek. Peralatan Utama

1 An.Ter Sambungan Baru Wifi (Complete TV, Wifi Dan Tlp) Ls 1.00 Rp 10,000,000.00 Rp 10,000,000.00

2 An.Ter Kabel Dari Central Ke Splitter Utama (Cat 6) M' 30.00 Rp 42,060.02 Rp 1,261,800.45

3 An.Ter Instalasi Daya Alat Ke Unit, NYM 3 x 2,5 mm2 + Pipa Conduit Titik 1.00 Rp 224,312.10 Rp 224,312.10

B Pek. Instalasi

1 An.Ter Outlet TV Unit 27.00 Rp 206,101.65 Rp 5,564,744.67

2 An.Ter Spliter 4 Way Unit 7.00 Rp 488,547.14 Rp 3,419,830.00

3 An.Ter Spliter 2 Way Unit 5.00 Rp 488,547.14 Rp 2,442,735.71

4 An.Ter Titik instalasi, Coaxial Cable RG11 (dalam conduit) Titik 27.00 Rp 614,749.43 Rp 16,598,234.51

TOTAL PEKERJAAN INSTALASI MATV Rp 39,511,657.44


DAFTAR KUANTITAS HARGA DAN BAHAN

SATUAN KERJA :DINAS KESEHATAN KABUPATEN SIGI


PEKERJAAN :REHABILITASI BERAT PUSKESMAS BIROMARU
LOKASI :DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN :2019

Kode HARGA SATUAN JUMLAH HARGA


No URAIAN PEKERJAAN SATUAN VOLUME
ANALISA (Rp) (Rp)
a b c d e f g
V.3 PEKERJAAN SISTEM PENTANAHAN (GROUNDING)

A Pekerjaan Penangkal Petir

1 An.Ter Stik Penangkal Petir Unit 25.00 Rp 59,565.00 Rp 1,489,125.00

2 An.Ter Pek. Kabel BC 50 mm + Aksesoris M' 40.00 Rp 67,091.28 Rp 2,683,651.20

3 An. Prak Pek. Besi Tembaga + Pipa Kabel BC Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00

4 An. Prak Pek. Grounding System Max. 5 Ohm Ls 1.00 Rp 500,000.00 Rp 500,000.00

Copper Rod, Clamp Rod, BAR CU, Kontrol Box

5 An.Ter Bak Kontrol Unit 1.00 Rp 84,724.80 Rp 84,724.80

6 An. Prak Material Bantu Ls 1.00 Rp 500,000.00 Rp 500,000.00

B Pekerjaan Grounding Arus Kuat

1 An.Ter Pek. Kabel BC 50 mm + Aksesoris M' 30.00 Rp 67,091.28 Rp 2,012,738.40

2 An. Prak Pek. Besi Tembaga + Pipa Kabel BC Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00

3 An. Prak Pek. Grounding System Max. 5 Ohm Set 1.00 Rp 500,000.00 Rp 500,000.00

Copper Rod, Clamp Rod, BAR CU, Kontrol Box

4 An.Ter Bak Kontrol Unit 1.00 Rp 84,724.80 Rp 84,724.80

5 An. Prak Material Bantu Set 1.00 Rp 500,000.00 Rp 500,000.00

6 An. Prak Pek. Testing & Commisioning Ls 1.00 Rp 1,000,000.00 Rp 1,000,000.00

TOTAL PEKERJAAN SISTEM PENTANAHAN (GROUNDING) Rp 12,354,964.20

TOTAL ITEM DIVISI 5 : PEKERJAAN ELEKTRIKAL Rp 282,648,800.13


DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

ANALISA PEKERJAAN TANAH


2.3.1.1 PerMen No 28-PRT-M-2016
Menggali 1 m3 tanah biasa sedalam 1 meter
A BAHAN

B TENAGA
0.750 Org/Hr. Pekerja Rp 87,500.00 Rp 65,625.00
0.025 Org/Hr. Mandor Rp 140,000.00 Rp 3,500.00
C ALAT

D JUMLAH (A+B+C) Rp 69,125.00


E 14.000 % Over Head + Profit (14% x D) Rp 9,677.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 78,802.50

2.3.1.9 PerMen No 28-PRT-M-2016


Mengurug kembali 1 m3 galian
A BAHAN

B TENAGA
0.500 Org/Hr. Pekerja Rp 87,500.00 Rp 43,750.00
0.050 Org/Hr. Mandor Rp 140,000.00 Rp 7,000.00
C ALAT

D JUMLAH (A+B+C) Rp 50,750.00


E 14.000 % Over Head + Profit (14% x D) Rp 7,105.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 57,855.00

2.3.1.10 PerMen No 28-PRT-M-2016


memadatkan 1 m3 tanah (per 20 cm)
A BAHAN

B TENAGA
0.500 Org/Hr. Pekerja Rp 87,500.00 Rp 43,750.00
0.050 Org/Hr. Mandor Rp 140,000.00 Rp 7,000.00
C ALAT
0.050 Alat/hari Sewa Stamper Rp 150,000.00 Rp 7,500.00
D JUMLAH (A+B+C) Rp 58,250.00
E 14.000 % Over Head + Profit (14% x D) Rp 8,155.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 66,405.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
2.3.1.8 PerMen No 28-PRT-M-2016
Membuang 1 m3 tanah sejauh 30 meter
A BAHAN

B TENAGA
0.330 Org/Hr. Pekerja Rp 87,500.00 Rp 28,875.00
0.010 Org/Hr. Mandor Rp 140,000.00 Rp 1,400.00
C ALAT

D JUMLAH (A+B+C) Rp 30,275.00


E 14.000 % Over Head + Profit (14% x D) Rp 4,238.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 34,513.50

2.3.1.11 PerMen No 28-PRT-M-2016


Mengurug 1 m3 pasir urug
A BAHAN
1.200 M3 Pasir Urug Rp 103,500.00 Rp 124,200.00
B TENAGA
0.300 Org/Hr. Pekerja Rp 87,500.00 Rp 26,250.00
0.010 Org/Hr. Mandor Rp 140,000.00 Rp 1,400.00
C ALAT

D JUMLAH (A+B+C) Rp 151,850.00


E 14.000 % Over Head + Profit (14% x D) Rp 21,259.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 173,109.00

2.3.1.14 PerMen No 28-PRT-M-2016


Mengurug 1 m3 tanah
A BAHAN
1.200 M3 Tanah Urug Rp 120,000.00 Rp 144,000.00
B TENAGA
0.300 Org/Hr. Pekerja Rp 87,500.00 Rp 26,250.00
0.010 Org/Hr. Mandor Rp 140,000.00 Rp 1,400.00
C ALAT

D JUMLAH (A+B+C) Rp 171,650.00


E 14.000 % Over Head + Profit (14% x D) Rp 24,031.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 195,681.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
ANALISA PEKERJAAN PONDASI
3.2.1.3 PerMen No 28-PRT-M-2016
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP
A BAHAN
1.200 M3 Batu Kali Rp 170,000.00 Rp 204,000.00
136.000 Kg Portland Cement Rp 1,280.00 Rp 174,080.00
0.544 M3 Pasir pasang Rp 126,500.00 Rp 68,816.00
B TENAGA
1.500 Org/Hr. Pekerja Rp 87,500.00 Rp 131,250.00
0.750 Org/Hr. Tukang Batu Rp 90,000.00 Rp 67,500.00
0.075 Org/Hr. Kepala Tukang Rp 105,000.00 Rp 7,875.00
0.075 Org/Hr. Mandor Rp 140,000.00 Rp 10,500.00
C ALAT

D JUMLAH (A+B+C) Rp 664,021.00


E 14.000 % Over Head + Profit (14% x D) Rp 92,962.94
F HARGA SATUAN PEKERJAAN (D+E) Rp 756,983.94

3.2.1.9 PerMen No 28-PRT-M-2016


Memasang 1 m3 batu kosong (aanstamping)
A BAHAN
1.200 m3 Batu belah 15 cm/20 cm Rp 269,840.00 Rp 323,808.00
0.432 m3 Pasir urug Rp 103,500.00 Rp 44,712.00
B TENAGA
0.780 Org/Hr. Pekerja Rp 87,500.00 Rp 68,250.00
0.390 Org/Hr. Tukang batu Rp 90,000.00 Rp 35,100.00
0.039 Org/Hr. Kepala tukang Rp 105,000.00 Rp 4,095.00
0.039 Org/Hr. Mandor Rp 140,000.00 Rp 5,460.00
C ALAT

D JUMLAH (A+B+C) Rp 481,425.00


E 14.000 % Over Head + Profit (14% x D) Rp 67,399.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 548,824.50

ANALISA PEKERJAAN BETON


4.1.1.1 PerMen No 28-PRT-M-2016
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
A BAHAN
247.00 kg Portland Cement Rp 1,280.00 Rp 316,160.00
869.000 kg Pasir beton (Kg) Rp 90.36 Rp 78,520.36
999.00 kg Koral Beton (Kg) Rp 123.33 Rp 123,210.00
215.00 Liter Air Rp 100.00 Rp 21,500.00
B TENAGA
1.650 Org/Hr. Pekerja Rp 87,500.00 Rp 144,375.00
0.275 Org/Hr. Tukang batu Rp 90,000.00 Rp 24,750.00
0.028 Org/Hr. Kepala tukang Rp 105,000.00 Rp 2,940.00
0.083 Org/Hr. Mandor Rp 140,000.00 Rp 11,620.00
C ALAT

D JUMLAH (A+B+C) Rp 723,075.36


E 14.000 % Over Head + Profit (14% x D) Rp 101,230.55
F HARGA SATUAN PEKERJAAN (D+E) Rp 824,305.91
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
4.1.1.8 PerMen No 28-PRT-M-2016
Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
A BAHAN
384.000 Kg Portland Cement Rp 1,280.00 Rp 491,520.00
692.000 Kg Pasir beton (kg) Rp 90.36 Rp 62,527.14
1039.000 Kg Koral beton (kg) Rp 123.33 Rp 128,143.33
215.000 Liter Air Rp 100.00 Rp 21,500.00
B TENAGA
1.650 Org/Hr. Pekerja Rp 87,500.00 Rp 144,375.00
0.275 Org/Hr. Tukang batu Rp 90,000.00 Rp 24,750.00
0.028 Org/Hr. Kepala tukang Rp 105,000.00 Rp 2,940.00
0.083 Org/Hr. Mandor Rp 140,000.00 Rp 11,620.00
C ALAT
0.100 Alat/Hr. Sewa Vibrator Rp 250,000.00 Rp 25,000.00
0.200 Alat/Hr. Sewa Molen Rp 350,000.00 Rp 70,000.00
D JUMLAH (A+B+C) Rp 982,375.48
E 14.000 % Over Head + Profit (14% x D) Rp 137,532.57
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,119,908.04

4.1.1.17 PerMen No 28-PRT-M-2016-6.17


Pembesian 1 kg dengan besi polos atau besi ulir
A BAHAN
1.050 Kg Besi Beton (Polos/Ulir) Rp 12,500.00 Rp 13,125.00
0.015 Kg Kawat Beton Rp 17,731.48 Rp 265.97
B TENAGA
0.007 Org/Hr. Pekerja Rp 87,500.00 Rp 612.50
0.007 Org/Hr. Tukang Besi Rp 90,000.00 Rp 630.00
0.001 Org/Hr. Kepala Tukang Rp 105,000.00 Rp 73.50
0.000 Org/Hr. Mandor Rp 140,000.00 Rp 56.00
C ALAT

D JUMLAH (A+B+C) Rp 14,762.97


E 14.000 % Over Head + Profit (14% x D) Rp 2,066.82
F HARGA SATUAN PEKERJAAN (D+E) Rp 16,829.79

4.1.1.17 PerMen No 28-PRT-M-2016-6.17


Pembesian 1 kg dengan besi polos atau besi ulir
A BAHAN
1.050 Kg Besi Beton (Polos/Ulir) Rp 12,500.00 Rp 13,125.00
0.015 Kg Kawat Beton Rp 17,731.48 Rp 265.97
B TENAGA
0.007 Org/Hr. Pekerja Rp 87,500.00 Rp 612.50
0.007 Org/Hr. Tukang Besi Rp 90,000.00 Rp 630.00
0.001 Org/Hr. Kepala Tukang Rp 105,000.00 Rp 73.50
0.000 Org/Hr. Mandor Rp 140,000.00 Rp 56.00
C ALAT

D JUMLAH (A+B+C) Rp 14,762.97


E 14.000 % Over Head + Profit (14% x D) Rp 2,066.82
F HARGA SATUAN PEKERJAAN (D+E) Rp 16,829.79
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
4.1.1.20 PerMen No 28-PRT-M-2016
Memasang 1 m2 bekisting pondasi
A BAHAN
0.040 m3 Kayu kelas III Rp 2,000,000.00 Rp 80,000.00
0.300 kg Paku 5 cm – 12 cm Rp 22,750.00 Rp 6,825.00
0.100 Liter Minyak bekisting Rp 4,725.00 Rp 472.50
B TENAGA
0.520 OH Pekerja Rp 87,500.00 Rp 45,500.00
0.260 OH Tukang kayu Rp 90,000.00 Rp 23,400.00
0.026 OH Kepala tukang Rp 105,000.00 Rp 2,730.00
0.026 OH Mandor Rp 140,000.00 Rp 3,640.00
C ALAT

D JUMLAH (A+B+C) Rp 162,567.50


E 14.000 % Over Head + Profit (14% x D) Rp 22,759.45
F HARGA SATUAN PEKERJAAN (D+E) Rp 185,326.95

4.1.1.21 PerMen No 28-PRT-M-2016


Memasang 1 m2 bekisting untuk sloof
A BAHAN
0.045 m3 Kayu kelas III Rp 2,000,000.00 Rp 45,000.00
0.300 kg Paku 5 cm – 12 cm Rp 22,750.00 Rp 6,825.00
0.100 Liter Minyak bekisting Rp 4,725.00 Rp 472.50
B TENAGA
0.520 OH Pekerja Rp 87,500.00 Rp 45,500.00
0.260 OH Tukang kayu Rp 90,000.00 Rp 23,400.00
0.026 OH Kepala tukang Rp 105,000.00 Rp 2,730.00
0.026 OH Mandor Rp 140,000.00 Rp 3,640.00
C ALAT

D JUMLAH (A+B+C) Rp 127,567.50


E 14.000 % Over Head + Profit (14% x D) Rp 17,859.45
F HARGA SATUAN PEKERJAAN (D+E) 2X PAKAI Rp 145,426.95
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
4.1.1.22 PerMen No 28-PRT-M-2016
Memasang 1 m2 bekisting untuk kolom
A BAHAN
0.040 m3 Kayu kelas III Rp 2,000,000.00 Rp 40,000.00
0.400 kg Paku 5 cm – 12 cm Rp 22,750.00 Rp 9,100.00
0.200 Liter Minyak bekisting Rp 4,725.00 Rp 945.00
0.015 m3 Balok Kayu kelas II Rp 3,000,000.00 Rp 22,500.00
0.350 Lbr Plywood 9 mm Rp 127,833.33 Rp 22,370.83
2.000 Batang Dolken kayu galam, φ (8–10) cm Rp 45,000.00 Rp 45,000.00
B TENAGA
0.660 OH Pekerja Rp 87,500.00 Rp 57,750.00
0.330 OH Tukang kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp 105,000.00 Rp 3,465.00
0.033 OH Mandor Rp 140,000.00 Rp 4,620.00
C ALAT

D JUMLAH (A+B+C) Rp 235,450.83


E 14.000 % Over Head + Profit (14% x D) Rp 32,963.12
F HARGA SATUAN PEKERJAAN (D+E) 2X PAKAI Rp 268,413.95

4.1.1.22 PerMen No 28-PRT-M-2016


Memasang 1 m2 bekisting kolom
A BAHAN
0.040 m3 Kayu kelas III Rp 2,000,000.00 Rp 80,000.00
0.400 kg Paku 5 cm – 12 cm Rp 22,750.00 Rp 9,100.00
0.200 Liter Minyak bekisting Rp 4,725.00 Rp 945.00
0.015 m3 Balok Kayu kelas II Rp 3,000,000.00 Rp 45,000.00
0.350 Lbr Plywood 9 mm Rp 127,833.33 Rp 44,741.67
2.000 Batang Dolken kayu galam, φ (8–10) cm Rp 45,000.00 Rp 90,000.00
B TENAGA
0.660 OH Pekerja Rp 87,500.00 Rp 57,750.00
0.330 OH Tukang kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp 105,000.00 Rp 3,465.00
0.033 OH Mandor Rp 140,000.00 Rp 4,620.00
C ALAT

D JUMLAH (A+B+C) Rp 365,321.67


E 14.000 % Over Head + Profit (14% x D) Rp 51,145.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 416,466.70
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
4.1.1.23 PerMen No 28-PRT-M-2016
Memasang 1 m2 bekisting untuk balok
A BAHAN
0.040 m3 Kayu kelas III Rp 2,000,000.00 Rp 40,000.00
0.400 kg Paku 5 cm – 12 cm Rp 22,750.00 Rp 9,100.00
0.200 Liter Minyak bekisting Rp 4,725.00 Rp 945.00
0.018 m3 Balok Kayu kelas II Rp 3,000,000.00 Rp 27,000.00
0.350 Lbr Plywood 9 mm Rp 127,833.33 Rp 22,370.83
2.000 Batang Dolken kayu galam, φ (8–10) cm Rp 45,000.00 Rp 45,000.00
B TENAGA
0.660 OH Pekerja Rp 87,500.00 Rp 57,750.00
0.330 OH Tukang kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp 105,000.00 Rp 3,465.00
0.033 OH Mandor Rp 140,000.00 Rp 4,620.00
C ALAT

D JUMLAH (A+B+C) Rp 239,950.83


E 14.000 % Over Head + Profit (14% x D) Rp 33,593.12
F HARGA SATUAN PEKERJAAN (D+E) 2X PAKAI Rp 273,543.95

4.1.1.23 PerMen No 28-PRT-M-2016


Memasang 1 m2 bekisting balok
A BAHAN
0.040 m3 Kayu kelas III Rp 2,000,000.00 Rp 80,000.00
0.400 kg Paku 5 cm – 12 cm Rp 22,750.00 Rp 9,100.00
0.200 Liter Minyak bekisting Rp 4,725.00 Rp 945.00
0.018 m3 Balok Kayu kelas II Rp 3,000,000.00 Rp 54,000.00
0.350 Lbr Plywood 9 mm Rp 127,833.33 Rp 44,741.67
2.000 Batang Dolken kayu galam, φ (8–10) cm Rp 45,000.00 Rp 90,000.00
B TENAGA
0.660 OH Pekerja Rp 87,500.00 Rp 57,750.00
0.330 OH Tukang kayu Rp 90,000.00 Rp 29,700.00
0.033 OH Kepala tukang Rp 105,000.00 Rp 3,465.00
0.033 OH Mandor Rp 140,000.00 Rp 4,620.00
C ALAT

D JUMLAH (A+B+C) Rp 374,321.67


E 14.000 % Over Head + Profit (14% x D) Rp 52,405.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 426,726.70
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
4.1.1.35 PerMen No 28-PRT-M-2016
Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
A BAHAN
0.002 m3 Kayu kelas III Rp 2,000,000.00 Rp 4,000.00
0.010 kg Paku 5 cm – 12 cm Rp 22,750.00 Rp 227.50
0.000 Liter Minyak bekisting Rp 4,725.00 Rp -
3.000 kg Besi Beton (Polos/Ulir) Rp 12,500.00 Rp 37,500.00
0.450 kg Kawat beton Rp 17,731.48 Rp 7,979.17
4.000 kg Portland Cement Rp 1,280.00 Rp 5,120.00
0.006 m3 Pasir beton Rp 126,500.00 Rp 759.00
0.009 m3 Koral Beton Rp 166,500.00 Rp 1,498.50
B TENAGA
0.180 Org/Hr. Pekerja Rp 87,500.00 Rp 15,750.00
0.020 Org/Hr. Tukang batu Rp 90,000.00 Rp 1,800.00
0.020 Org/Hr. Tukang kayu Rp 90,000.00 Rp 1,800.00
0.020 Org/Hr. Tukang besi Rp 90,000.00 Rp 1,800.00
0.006 Org/Hr. Kepala tukang Rp 105,000.00 Rp 630.00
0.009 Org/Hr. Mandor Rp 140,000.00 Rp 1,260.00
C ALAT

D JUMLAH (A+B+C) Rp 80,124.17


E 14.000 % Over Head + Profit (14% x D) Rp 11,217.38
F HARGA SATUAN PEKERJAAN (D+E) Rp 91,341.55

4.1.1.36 PerMen No 28-PRT-M-2016


Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
A BAHAN
0.003 m3 Kayu kelas III Rp 2,000,000.00 Rp 6,000.00
0.020 kg Paku 5 cm – 12 cm Rp 22,750.00 Rp 455.00
0.400 Liter Minyak bekisting Rp 4,725.00 Rp 1,890.00
3.600 kg Besi Beton (Polos/Ulir) Rp 12,500.00 Rp 45,000.00
0.050 kg Kawat beton Rp 17,731.48 Rp 886.57
5.500 kg Portland Cement Rp 1,280.00 Rp 7,040.00
0.009 m3 Pasir beton Rp 126,500.00 Rp 1,138.50
0.015 m3 Koral Beton Rp 166,500.00 Rp 2,497.50
B TENAGA
0.297 Org/Hr. Pekerja Rp 87,500.00 Rp 25,987.50
0.033 Org/Hr. Tukang batu Rp 90,000.00 Rp 2,970.00
0.033 Org/Hr. Tukang kayu Rp 90,000.00 Rp 2,970.00
0.033 Org/Hr. Tukang besi Rp 90,000.00 Rp 2,970.00
0.010 Org/Hr. Kepala tukang Rp 105,000.00 Rp 1,050.00
0.015 Org/Hr. Mandor Rp 140,000.00 Rp 2,100.00
C ALAT

D JUMLAH (A+B+C) Rp 102,955.07


E 14.000 % Over Head + Profit (14% x D) Rp 14,413.71
F HARGA SATUAN PEKERJAAN (D+E) Rp 117,368.78
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
ANALISA PEKERJAAN DINDING
4.4.1.10 PerMen No 28-PRT-M-2016
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP
A BAHAN
70.000 Buah Bata merah Rp 1,000.00 Rp 70,000.00
9.680 kg Portland Cement Rp 1,280.00 Rp 12,390.40
0.045 m3 Pasir Pasang Rp 126,500.00 Rp 5,692.50
B TENAGA
0.300 Org/ Hr Pekerja Rp 87,500.00 Rp 26,250.00
0.100 Org/ Hr Tukang batu Rp 90,000.00 Rp 9,000.00
0.010 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,050.00
0.015 Org/ Hr Mandor Rp 140,000.00 Rp 2,100.00
C ALAT

D JUMLAH (A+B+C) Rp 126,482.90


E 14.000 % Over Head + Profit (14% x D) Rp 17,707.61
F HARGA SATUAN PEKERJAAN (D+E) Rp 144,190.51

ANALISA PEKERJAAN PLESTERAN


4.4.2.3 PerMen No 28-PRT-M-2016
Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
A BAHAN
7.776 kg Portland Cement Rp 1,280.00 Rp 9,953.28
0.023 m3 Pasir Pasang Rp 126,500.00 Rp 2,909.50
B TENAGA
0.300 Org/ Hr Pekerja Rp 87,500.00 Rp 26,250.00
0.150 Org/ Hr Tukang batu Rp 90,000.00 Rp 13,500.00
0.015 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,575.00
0.015 Org/ Hr Mandor Rp 140,000.00 Rp 2,100.00
C ALAT

D JUMLAH (A+B+C) Rp 56,287.78


E 14.000 % Over Head + Profit (14% x D) Rp 7,880.29
F HARGA SATUAN PEKERJAAN (D+E) Rp 64,168.07

4.4.2.5 PerMen No 28-PRT-M-2016


Memasang 1 m2 acian
A BAHAN
3.250 kg Portland Cement Rp 1,280.00 Rp 4,160.00
B TENAGA
0.200 Org/ Hr Pekerja Rp 87,500.00 Rp 17,500.00
0.100 Org/ Hr Tukang batu Rp 90,000.00 Rp 9,000.00
0.010 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,050.00
0.010 Org/ Hr Mandor Rp 140,000.00 Rp 1,400.00
C ALAT

D JUMLAH (A+B+C) Rp 33,110.00


E 14.000 % Over Head + Profit (14% x D) Rp 4,635.40
F HARGA SATUAN PEKERJAAN (D+E) Rp 37,745.40
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
ANALISA PEKERJAAN UBIN/TEGEL
Analisa Terapan
Memasang 1 m' Plint Homogenous Tile ukuran (10 x 60) cm
A BAHAN
0.620 Buah Homogenous Tile 60x60 cm Rp 62,733.33 Rp 38,894.67
2.400 kg Portland Cement Rp 1,280.00 Rp 3,072.00
0.011 m3 Pasir Pasang Rp 126,500.00 Rp 1,423.13
0.375 kg Semen warna Rp 17,833.33 Rp 6,687.50
B TENAGA
0.060 Org/ Hr Pekerja Rp 87,500.00 Rp 5,250.00
0.030 Org/ Hr Tukang batu Rp 90,000.00 Rp 2,700.00
0.003 Org/ Hr Kepala tukang Rp 105,000.00 Rp 315.00
0.003 Org/ Hr Mandor Rp 140,000.00 Rp 420.00
C ALAT

D JUMLAH (A+B+C) Rp 58,762.29


E 14.000 % Over Head + Profit (14% x D) Rp 8,226.72
F HARGA SATUAN PEKERJAAN (D+E) Rp 66,989.01

Analisa Terapan
Memasang 1 m2 lantai keramik ukuran (50 x 50) cm
A BAHAN
4.000 Buah keramik 50x50 cm Rp 35,000.00 Rp 140,000.00
9.600 kg Portland Cement Rp 1,280.00 Rp 12,288.00
0.045 m3 Pasir Pasang Rp 126,500.00 Rp 5,692.50
1.500 kg Semen warna Rp 17,833.33 Rp 26,750.00
B TENAGA
0.240 Org/ Hr Pekerja Rp 87,500.00 Rp 21,000.00
0.120 Org/ Hr Tukang batu Rp 90,000.00 Rp 10,800.00
0.012 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,260.00
0.012 Org/ Hr Mandor Rp 140,000.00 Rp 1,680.00
C ALAT

D JUMLAH (A+B+C) Rp 219,470.50


E 14.000 % Over Head + Profit (14% x D) Rp 30,725.87
F HARGA SATUAN PEKERJAAN (D+E) Rp 250,196.37
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 m2 lantai Granit ukuran (60 x 60) cm
A BAHAN
3.000 Buah Homogenous Tile 60x60 cm Rp 62,733.33 Rp 188,200.00
9.700 kg Portland Cement Rp 1,280.00 Rp 12,416.00
0.050 m3 Pasir Pasang Rp 126,500.00 Rp 6,325.00
1.550 kg Semen warna Rp 17,833.33 Rp 27,641.67
B TENAGA
0.260 Org/ Hr Pekerja Rp 87,500.00 Rp 22,750.00
0.130 Org/ Hr Tukang batu Rp 90,000.00 Rp 11,700.00
0.013 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,365.00
0.013 Org/ Hr Mandor Rp 140,000.00 Rp 1,820.00
C ALAT

D JUMLAH (A+B+C) Rp 272,217.67


E 14.000 % Over Head + Profit (14% x D) Rp 38,110.47
F HARGA SATUAN PEKERJAAN (D+E) Rp 310,328.14

Analisa Terapan
Memasang 1 m2 dinding keramik ukuran (20 x 40) cm
A BAHAN
10.000 Buah Keramik 20x40 cm Rp 8,076.92 Rp 80,769.23
9.300 kg Portland Cement Rp 1,280.00 Rp 11,904.00
0.018 m3 Pasir Pasang Rp 126,500.00 Rp 2,277.00
1.940 kg Semen warna Rp 17,833.33 Rp 34,596.67
B TENAGA
0.900 Org/ Hr Pekerja Rp 87,500.00 Rp 78,750.00
0.450 Org/ Hr Tukang batu Rp 90,000.00 Rp 40,500.00
0.045 Org/ Hr Kepala tukang Rp 105,000.00 Rp 4,725.00
0.045 Org/ Hr Mandor Rp 140,000.00 Rp 6,300.00
C ALAT

D JUMLAH (A+B+C) Rp 259,821.90


E 14.000 % Over Head + Profit (14% x D) Rp 36,375.07
F HARGA SATUAN PEKERJAAN (D+E) Rp 296,196.96
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
ANALISA PEKERJAAN PINTU, JENDELA DAN VENTILASI
Analisa Terapan
Memasang 1 Set Pintu PJ1 + Aksesoris
A BAHAN
19.315 M Profil alluminium "Jeep" Rp 54,274.68 Rp 1,048,309.92
19.315 M Profil alluminium "Tutup Jeep" Rp 20,116.95 Rp 388,556.88
9.020 M Profil alluminium "Ambang Datar Tegak" Rp 39,659.20 Rp 357,725.98
1.650 M Profil alluminium "Ambang Datar Bawah" Rp 46,802.70 Rp 77,224.46
1.650 M Profil alluminium "Ambang Datar Atas" Rp 30,298.63 Rp 49,992.73
14.782 M2 Kaca Bening 5 mm Rp 136,000.00 Rp 2,010,309.84
25.000 M Allumunium Spigot Rp 23,625.00 Rp 590,625.00
B Aksesoris
2.000 Bh Engsel Tanam Rp 820,260.00 Rp 1,640,520.00
4.000 Bh Pull Handle Stainless 32x300 Rp 472,626.00 Rp 1,890,504.00
1.000 Bh Kunci Tanam Pintu Allumunium Rp 146,814.00 Rp 146,814.00
1.000 Bh Flush Bolt / Grandel Pintu Engsel Tanam Rp 78,120.00 Rp 78,120.00
37.920 M Sealant Rp 6,562.50 Rp 248,850.00
C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 2,250,000.00 Rp 2,250,000.00
D JUMLAH (A+B+C) Rp 10,777,552.81
E 14.000 % Over Head + Profit (14% x D) Rp 1,508,857.39
F HARGA SATUAN PEKERJAAN (D+E) Rp 12,286,410.20

Analisa Terapan
Memasang 1 Set Pintu PJ2 + Aksesoris
A BAHAN
18.975 M Profil alluminium "Jeep" Rp 54,274.68 Rp 1,029,861.96
18.975 M Profil alluminium "Tutup Jeep" Rp 20,116.95 Rp 381,719.13
4.510 M Profil alluminium "Ambang Datar Tegak" Rp 39,659.20 Rp 178,862.99
1.100 M Profil alluminium "Ambang Datar Bawah" Rp 46,802.70 Rp 51,482.97
1.100 M Profil alluminium "Ambang Datar Atas" Rp 30,298.63 Rp 33,328.49
12.540 M Profil alluminium "Stoper Casement" Rp 26,849.90 Rp 336,697.75
12.540 M Profil alluminium "Frame Casement" Rp 35,882.00 Rp 449,960.28
12.540 M Profil alluminium "Bead Casement" Rp 13,671.12 Rp 171,435.80
11.707 M2 Kaca Bening 5 mm Rp 136,000.00 Rp 1,592,118.00
20.000 M Allumunium Spigot Rp 23,625.00 Rp 472,500.00
B Aksesoris
1.000 Bh Engsel Tanam Rp 820,260.00 Rp 820,260.00
6.000 Bh Friction Stay (Engsel Casement) 14" Rp 161,773.50 Rp 970,641.00
3.000 Bh Casement Handle Rp 27,300.00 Rp 81,900.00
1.000 Bh Kunci Tanam Pintu Allumunium Rp 146,814.00 Rp 146,814.00
2.000 Bh Pull Handle Stainless 32x300 Rp 472,626.00 Rp 945,252.00
36.480 M Sealant Rp 6,562.50 Rp 239,400.00
C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 2,000,000.00 Rp 2,000,000.00
D JUMLAH (A+B+C) Rp 9,902,234.36
E 14.000 % Over Head + Profit (14% x D) Rp 1,386,312.81
F HARGA SATUAN PEKERJAAN (D+E) Rp 11,288,547.17
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Set Pintu P2 + Aksesoris
A BAHAN
7.370 M Profil alluminium Openbek "Profil C" Rp 49,922.95 Rp 367,932.14
4.840 M Profil alluminium "Ambang Datar Tegak" Rp 39,659.20 Rp 191,950.53
1.980 M Profil alluminium "Ambang Datar Atas" Rp 30,298.63 Rp 59,991.28
1.936 M2 Plywood 5 mm Rp 97,000.00 Rp 187,792.00
3.872 M2 High Laminate Pressure (HPL) Rp 200,000.00 Rp 774,400.00
18.000 M Allumunium Spigot Rp 23,625.00 Rp 425,250.00
B Aksesoris
1.000 Bh Engsel Tanam Rp 820,260.00 Rp 820,260.00
2.000 Bh Pull Handle Stainless 32x300 Rp 472,626.00 Rp 945,252.00
15.300 M Sealant Rp 6,562.50 Rp 100,406.25
C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 1,250,000.00 Rp 1,250,000.00
D JUMLAH (A+B+C) Rp 5,123,234.20
E 14.000 % Over Head + Profit (14% x D) Rp 717,252.79
F HARGA SATUAN PEKERJAAN (D+E) Rp 5,840,486.98

Analisa Terapan
Memasang 1 Set Pintu P3 + Aksesoris
A BAHAN
6.380 M Profil alluminium Openbek "Profil C" Rp 49,922.95 Rp 318,508.42
4.840 M Profil alluminium "Ambang Datar Tegak" Rp 39,659.20 Rp 191,950.53
1.608 M Profil alluminium "Ambang Datar Atas" Rp 30,298.63 Rp 48,726.25
3.872 M2 Plywood 5 mm Rp 97,000.00 Rp 375,584.00
7.744 M2 High Laminate Pressure (HPL) Rp 200,000.00 Rp 1,548,800.00
25.000 M Allumunium Spigot Rp 23,625.00 Rp 590,625.00
B Aksesoris
2.000 Bh Engsel Tanam Rp 820,260.00 Rp 1,640,520.00
4.000 Bh Pull Handle Stainless 32x300 Rp 472,626.00 Rp 1,890,504.00
1.000 Bh Flush Bolt / Grandel Pintu Engsel Tanam Rp 78,120.00 Rp 78,120.00
15.300 M Sealant Rp 6,562.50 Rp 100,406.25
C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 1,200,000.00 Rp 1,200,000.00
D JUMLAH (A+B+C) Rp 7,983,744.45
E 14.000 % Over Head + Profit (14% x D) Rp 1,117,724.22
F HARGA SATUAN PEKERJAAN (D+E) Rp 9,101,468.67
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Set Pintu P1 + Aksesoris
A BAHAN
8.140 M Profil alluminium Openbek "Profil C" Rp 49,922.95 Rp 406,372.81
4.840 M Profil alluminium "Ambang Datar Tegak" Rp 39,659.20 Rp 191,950.53
3.080 M Profil alluminium "Ambang Datar Atas" Rp 30,298.63 Rp 93,319.77
3.388 M2 Plywood 5 mm Rp 97,000.00 Rp 328,636.00
6.776 M2 High Laminate Pressure (HPL) Rp 200,000.00 Rp 1,355,200.00
25.000 M Allumunium Spigot Rp 23,625.00 Rp 590,625.00
B Aksesoris
2.000 Bh Engsel Tanam Rp 820,260.00 Rp 1,640,520.00
4.000 Bh Pull Handle Stainless 32x300 Rp 472,626.00 Rp 1,890,504.00
1.000 Bh Flush Bolt / Grandel Pintu Engsel Tanam Rp 78,120.00 Rp 78,120.00
15.300 M Sealant Rp 6,562.50 Rp 100,406.25
C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 1,500,000.00 Rp 1,500,000.00
D JUMLAH (A+B+C) Rp 8,175,654.36
E 14.000 % Over Head + Profit (14% x D) Rp 1,144,591.61
F HARGA SATUAN PEKERJAAN (D+E) Rp 9,320,245.97

Analisa Terapan
Memasang 1 Set Pintu P4 + Aksesoris
A BAHAN
6.820 M Profil alluminium Openbek "Profil C" Rp 49,922.95 Rp 340,474.52
4.840 M Profil alluminium "Ambang Datar Tegak" Rp 39,659.20 Rp 191,950.53
0.990 M Profil alluminium "Ambang Datar Bawah" Rp 46,802.70 Rp 46,334.67
0.990 M Profil alluminium "Ambang Datar Atas" Rp 30,298.63 Rp 29,995.64
1.892 M2 Plywood 5 mm Rp 97,000.00 Rp 183,524.00
3.784 M2 High Laminate Pressure (HPL) Rp 200,000.00 Rp 756,800.00
7.500 M Allumunium Spigot Rp 23,625.00 Rp 177,187.50
B Aksesoris
3.000 Bh Engsel Pintu Kupu-kupu Rp 86,677.50 Rp 260,032.50
1.000 Bh Kunci Tanam Pintu Allumunium Rp 146,814.00 Rp 146,814.00
2.000 Bh Pull Handle Stainless 32x300 Rp 472,626.00 Rp 945,252.00
17.800 M Sealant Rp 6,562.50 Rp 116,812.50
C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 700,000.00 Rp 700,000.00
D JUMLAH (A+B+C) Rp 3,895,177.86
E 14.000 % Over Head + Profit (14% x D) Rp 545,324.90
F HARGA SATUAN PEKERJAAN (D+E) Rp 4,440,502.76
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Set Pintu PJ1 + Aksesoris
A BAHAN
3.872 M Kaca Temperet Laminated 12 mm Rp 789,916.67 Rp 3,058,557.33
0.880 M Sticker Sandblast Rp 262,500.00 Rp 231,000.00
B Aksesoris
2.000 Bh Engsel Tanam Rp 820,260.00 Rp 1,640,520.00
2.000 Bh Patch Fitting PT40 Rp 818,958.00 Rp 1,637,916.00
2.000 Bh Patch Fitting PT10 Rp 493,458.00 Rp 986,916.00
2.000 Bh Patch Lock Rp 921,816.00 Rp 1,843,632.00
4.000 Bh Pull Handle Stainless 38x1000 Rp 1,123,626.00 Rp 4,494,504.00
31.680 M Sealant Rp 6,562.50 Rp 207,900.00
C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 1,500,000.00 Rp 1,500,000.00
D JUMLAH (A+B+C) Rp 15,600,945.33
E 14.000 % Over Head + Profit (14% x D) Rp 2,184,132.35
F HARGA SATUAN PEKERJAAN (D+E) Rp 17,785,077.68

Analisa Terapan
Memasang 1 Set Jendela (J1) + Aksesoris
A BAHAN
17.105 M Profil alluminium "Jeep" Rp 54,274.68 Rp 928,368.32
17.105 M Profil alluminium "Tutup Jeep" Rp 20,116.95 Rp 344,100.43
10.725 M Profil alluminium "Tutup Kaca Mati" Rp 28,245.88 Rp 302,937.01
3.960 M2 Kaca Bening 5 mm Rp 136,000.00 Rp 538,560.00
8.580 M Profil alluminium "Stoper Casement" Rp 26,849.90 Rp 230,372.14
8.580 M Profil alluminium "Frame Casement" Rp 35,882.00 Rp 307,867.56
8.580 M Profil alluminium "Bead Casement" Rp 13,671.12 Rp 117,298.18
15.000 M Allumunium Spigot Rp 23,625.00 Rp 354,375.00
B AKSESORIS
4.000 Bh Friction Stay (Engsel Casement) 14" Rp 161,773.50 Rp 647,094.00
2.000 Bh Casement Handle Rp 27,300.00 Rp 54,600.00
18.200 M Sealant Rp 6,562.50 Rp 119,437.50

C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 1,000,000.00 Rp 1,000,000.00
D JUMLAH (A+B+C) Rp 4,945,010.14
E 14.000 % Over Head + Profit (14% x D) Rp 692,301.42
F HARGA SATUAN PEKERJAAN (D+E) Rp 5,637,311.56
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Set Jendela (J2) + Aksesoris
A BAHAN
11.550 M Profil alluminium "Jeep" Rp 54,274.68 Rp 626,872.50
11.550 M Profil alluminium "Tutup Jeep" Rp 20,116.95 Rp 232,350.77
7.700 M Profil alluminium "Tutup Kaca Mati" Rp 28,245.88 Rp 217,493.24
1.980 M2 Kaca Bening 5 mm Rp 136,000.00 Rp 269,280.00
4.290 M Profil alluminium "Stoper Casement" Rp 26,849.90 Rp 115,186.07
4.290 M Profil alluminium "Frame Casement" Rp 35,882.00 Rp 153,933.78
4.290 M Profil alluminium "Bead Casement" Rp 13,671.12 Rp 58,649.09
10.000 M Allumunium Spigot Rp 23,625.00 Rp 236,250.00
B AKSESORIS
2.000 Bh Friction Stay (Engsel Casement) 14" Rp 161,773.50 Rp 323,547.00
1.000 Bh Casement Handle Rp 27,300.00 Rp 27,300.00
13.200 M Sealant Rp 6,562.50 Rp 86,625.00

C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 750,000.00 Rp 750,000.00
D JUMLAH (A+B+C) Rp 3,097,487.45
E 14.000 % Over Head + Profit (14% x D) Rp 433,648.24
F HARGA SATUAN PEKERJAAN (D+E) Rp 3,531,135.69

Analisa Terapan
Memasang 1 Set Jendela (J3) + Aksesoris
A BAHAN
44.880 M Profil alluminium "Jeep" Rp 54,274.68 Rp 2,435,847.41
44.880 M Profil alluminium "Tutup Jeep" Rp 20,116.95 Rp 902,848.72
36.410 M Profil alluminium "Tutup Kaca Mati" Rp 28,245.88 Rp 1,028,432.31
12.540 M2 Kaca Bening 5 mm Rp 136,000.00 Rp 1,705,440.00
17.000 M Allumunium Spigot Rp 23,625.00 Rp 401,625.00
B AKSESORIS
32.000 M Sealant Rp 6,562.50 Rp 210,000.00

C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 1,000,000.00 Rp 1,000,000.00
D JUMLAH (A+B+C) Rp 7,684,193.44
E 14.000 % Over Head + Profit (14% x D) Rp 1,075,787.08
F HARGA SATUAN PEKERJAAN (D+E) Rp 8,759,980.52
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Set Ventilasi (V1) + Aksesoris
A BAHAN
17.468 M Profil alluminium "M" Rp 58,905.18 Rp 1,028,955.60
17.468 M Profil alluminium "Tutup Kaca Mati" Rp 28,245.88 Rp 493,398.94
3.300 M Profil Alluminium Hollow 1x1/2 Rp 15,274.00 Rp 50,404.20
3.080 M2 Kaca Bening 5 mm Rp 136,000.00 Rp 418,880.00
B AKSESORIS
11.600 M' Sealant Rp 6,562.50 Rp 76,125.00
C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 500,000.00 Rp 500,000.00
D JUMLAH (A+B+C) Rp 2,567,763.74
E 14.000 % Over Head + Profit (14% x D) Rp 359,486.92
F HARGA SATUAN PEKERJAAN (D+E) Rp 2,927,250.67

Analisa Terapan
Memasang 1 Set Ventilasi (V2) + Aksesoris
A BAHAN
2.860 M Profil alluminium "M" Rp 58,905.18 Rp 168,468.80
2.860 M Profil alluminium "Tutup Kaca Mati" Rp 28,245.88 Rp 80,783.20
2.860 M Profil Alluminium Hollow 1x1/2 Rp 15,274.00 Rp 43,683.64
2.860 M2 Kaca Bening 5 mm Rp 136,000.00 Rp 388,960.00
B AKSESORIS
8.400 M' Sealant Rp 6,562.50 Rp 55,125.00
C UPAH
1.000 Ls Pengerjaan Dan Pemasangan Rp 100,000.00 Rp 100,000.00
D JUMLAH (A+B+C) Rp 837,020.64
E 14.000 % Over Head + Profit (14% x D) Rp 117,182.89
F HARGA SATUAN PEKERJAAN (D+E) Rp 954,203.53

ANALISA PEKERJAAN PENUTUP ATAP


Analisa Terapan
1 m2 Pasang Rangka kuda-kuda baja Ringan + Genteng Metal
A BAHAN
2.100 M' Smartruss C 75.65 Rp 15,225.00 Rp 31,972.50
3.500 M' Reng R 32-0,45 Rp 8,225.00 Rp 28,787.50
15.000 Bh Self Drilling Screw dia-10x16mm (truss screw)
Rp 189.00 Rp 2,835.00
25.000 Bh Self Drilling Screw dia-10x40mm (Roof ButtonRp
Screw) 441.00 Rp 11,025.00
1.000 m2 Genteng Metal Soka Rp 67,200.00 Rp 67,200.00
B TENAGA
0.247 Org/ Hr Pekerja Rp 87,500.00 Rp 21,612.50
0.176 Org/ Hr Tukang Besi Rp 90,000.00 Rp 15,840.00
0.117 Org/ Hr Kepala tukang Rp 105,000.00 Rp 12,285.00
0.012 Org/ Hr Mandor Rp 140,000.00 Rp 1,638.00
C ALAT

D JUMLAH (A+B+C) Rp 193,195.50


E 14.000 % Over Head + Profit (14% x D) Rp 27,047.37
F HARGA SATUAN PEKERJAAN (D+E) Rp 220,242.87
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
ANALISA PEKERJAAN LANGIT-LANGIT
Analisa Terapan
Memasang 1 Bh Manhole
A BAHAN
1.050 m’ Allumunium Siku Rp 7,500.00 Rp 7,875.00
B TENAGA
0.050 Org/ Hr Pekerja Rp 87,500.00 Rp 4,375.00
0.050 Org/ Hr Tukang Kayu Rp 90,000.00 Rp 4,500.00
0.005 Org/ Hr Kepala tukang Rp 105,000.00 Rp 525.00
0.003 Org/ Hr Mandor Rp 140,000.00 Rp 420.00
C ALAT

D JUMLAH (A+B+C) Rp 17,695.00


E 14.000 % Over Head + Profit (14% x D) Rp 2,477.30
F HARGA SATUAN PEKERJAAN (D+E) Rp 20,172.30

Analisa Terapan
Memasang 1 m2 langit-langit gypsum + rangka metal hollow
A BAHAN
2.100 m’ Rangka Metal Hollow 2x4 Rp 4,375.00 Rp 9,187.50
1.600 m’ Rangka Metal Hollow 4x4 Rp 6,125.00 Rp 9,800.00
0.150 Kg Kawat Diameter 4 mm Rp 36,750.00 Rp 5,512.50
1.050 Bh Ramset Rp 3,675.00 Rp 3,858.75
0.364 Lembar Gypsum board 120x240 cm, tebal 9mm Rp 75,625.00 Rp 27,527.50
0.110 kg Screw Bremick Rp 126.00 Rp 13.86
B TENAGA
0.500 Org/ Hr Pekerja Rp 87,500.00 Rp 43,750.00
0.500 Org/ Hr Tukang besi Rp 90,000.00 Rp 45,000.00
0.050 Org/ Hr Kepala tukang Rp 105,000.00 Rp 5,250.00
0.025 Org/ Hr Mandor Rp 140,000.00 Rp 3,500.00
C ALAT

D JUMLAH (A+B+C) Rp 153,400.11


E 14.000 % Over Head + Profit (14% x D) Rp 21,476.02
F HARGA SATUAN PEKERJAAN (D+E) Rp 174,876.13
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 m2 langit-langit kalsiboard + rangka metal hollow
A BAHAN
2.100 m’ Rangka Metal Hollow 2x4 Rp 4,375.00 Rp 9,187.50
1.600 m’ Rangka Metal Hollow 4x4 Rp 6,125.00 Rp 9,800.00
0.150 Kg Kawat Diameter 4 mm Rp 36,750.00 Rp 5,512.50
1.050 Bh Ramset Rp 3,675.00 Rp 3,858.75
0.364 Lembar Kalsiboard 3,5 mm Rp 23,632.76 Rp 8,602.32
11.000 Bh Self Drilling Screw dia-10x16mm (truss screw)
Rp 189.00 Rp 2,079.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 87,500.00 Rp 43,750.00
0.500 Org/ Hr Tukang besi Rp 90,000.00 Rp 45,000.00
0.050 Org/ Hr Kepala tukang Rp 105,000.00 Rp 5,250.00
0.025 Org/ Hr Mandor Rp 140,000.00 Rp 3,500.00
C ALAT

D JUMLAH (A+B+C) Rp 136,540.07


E 14.000 % Over Head + Profit (14% x D) Rp 19,115.61
F HARGA SATUAN PEKERJAAN (D+E) Rp 155,655.69

Analisa Terapan
Memasang 1 m' langit-langit Gypsum Type Drop Ceiling
A BAHAN
2.100 m’ Rangka Metal Hollow 2x4 Rp 4,375.00 Rp 9,187.50
1.600 m’ Rangka Metal Hollow 4x4 Rp 6,125.00 Rp 9,800.00
0.150 Kg Kawat Diameter 4 mm Rp 36,750.00 Rp 5,512.50
1.050 Bh Ramset Rp 3,675.00 Rp 3,858.75
1.050 m2 Gypsum board 120x240 cm, tebal 9mm Rp 75,625.00 Rp 79,406.25
0.110 kg Screw Bremick Rp 126.00 Rp 13.86
B TENAGA
0.021 Org/ Hr Pekerja Rp 87,500.00 Rp 1,837.50
0.021 Org/ Hr Tukang Allumunium Rp 90,000.00 Rp 1,890.00
0.002 Org/ Hr Kepala tukang Rp 105,000.00 Rp 210.00
0.001 Org/ Hr Mandor Rp 140,000.00 Rp 140.00
C ALAT

D JUMLAH (A+B+C) Rp 111,856.36


E 14.000 % Over Head + Profit (14% x D) Rp 15,659.89
F HARGA SATUAN PEKERJAAN (D+E) Rp 127,516.25
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
4.5.1.8 PerMen No 28-PRT-M-2016
Memasang 1 m pasang list gypsum langit-langit
A BAHAN
1.050 m’ List Profil Gypsum Rp 15,758.33 Rp 16,546.25
0.150 kg Tepung Gypsum Rp 4,216.67 Rp 632.50
B TENAGA
0.060 Org/ Hr Pekerja Rp 87,500.00 Rp 5,250.00
0.060 Org/ Hr Tukang kayu Rp 90,000.00 Rp 5,400.00
0.006 Org/ Hr Kepala tukang Rp 105,000.00 Rp 630.00
0.003 Org/ Hr Mandor Rp 140,000.00 Rp 420.00
C ALAT

D JUMLAH (A+B+C) Rp 28,878.75


E 14.000 % Over Head + Profit (14% x D) Rp 4,043.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 32,921.78

ANALISA PEKERJAAN PENGECATAN


Analisa Terapan
1 m² Pengecatan Tembok Baru Eksterior (1 Lapis Cat Dasar Weathershield, 3 Lapis Cat Penutup )
A BAHAN
0.100 Kg Cat Dasar Rp 42,252.00 Rp 4,225.20
0.360 Kg Cat Tembok Rp 37,800.00 Rp 13,608.00
B TENAGA
0.020 Org/ Hr Pekerja Rp 87,500.00 Rp 1,750.00
0.063 Org/ Hr Tukang Cat Rp 90,000.00 Rp 5,670.00
0.006 Org/ Hr Kepala tukang Rp 105,000.00 Rp 661.50
0.003 Org/ Hr Mandor Rp 140,000.00 Rp 350.00
C ALAT

D JUMLAH (A+B+C) Rp 26,264.70


E 14.000 % Over Head + Profit (14% x D) Rp 3,677.06
F HARGA SATUAN PEKERJAAN (D+E) Rp 29,941.76

Analisa Terapan
1 m² Pengecatan Langit-Langit ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
A BAHAN
0.260 Kg Cat Penutup 2 Rp 37,800.00 Rp 9,828.00
B TENAGA
0.028 Org/ Hr Pekerja Rp 87,500.00 Rp 2,450.00
0.042 Org/ Hr Tukang Cat Rp 90,000.00 Rp 3,780.00
0.004 Org/ Hr Kepala tukang Rp 105,000.00 Rp 441.00
0.003 Org/ Hr Mandor Rp 140,000.00 Rp 350.00
C ALAT

D JUMLAH (A+B+C) Rp 16,849.00


E 14.000 % Over Head + Profit (14% x D) Rp 2,358.86
F HARGA SATUAN PEKERJAAN (D+E) Rp 19,207.86
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Unit Exhaust Fan 10 Inch
A BAHAN
1.000 Unit Exhaust Fan 10 Inch Rp 420,000.00 Rp 420,000.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 50,000.00 Rp 50,000.00
C ALAT

D JUMLAH (A+B+C) Rp 470,000.00


E 14.000 % Over Head + Profit (14% x D) Rp 65,800.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 535,800.00

ANALISA PEKERJAAN AIR BERSIH DAN SANITASI


5.1.1.1 PerMen No 28-PRT-M-2016
Memasang 1 buah Kloset Duduk
A BAHAN
1.000 Bh Kloset Duduk Rp 2,951,462.50 Rp 2,951,462.50
B TENAGA
0.250 Org/ Hr Pekerja Rp 87,500.00 Rp 21,875.00
0.150 Org/ Hr Tukang kayu Rp 90,000.00 Rp 13,500.00
0.015 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,575.00
0.013 Org/ Hr Mandor Rp 140,000.00 Rp 1,820.00
C ALAT

D JUMLAH (A+B+C) Rp 2,990,232.50


E 14.000 % Over Head + Profit (14% x D) Rp 418,632.55
F HARGA SATUAN PEKERJAAN (D+E) Rp 3,408,865.05

Analisa Terapan
Memasang 1 buah Wastafel Type Meja
A BAHAN
1.000 Bh Wastafel 2 Rp 1,470,000.00 Rp 1,470,000.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 150,000.00 Rp 150,000.00
C ALAT

D JUMLAH (A+B+C) Rp 1,620,000.00


E 14.000 % Over Head + Profit (14% x D) Rp 226,800.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,846,800.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 bh Cermin
A BAHAN
1.000 Bh Cermin Rp 715,050.00 Rp 715,050.00
B TENAGA
0.100 Org/ Hr Pekerja Rp 87,500.00 Rp 8,750.00
0.200 Org/ Hr Tukang kayu Rp 90,000.00 Rp 18,000.00
0.100 Org/ Hr Kepala tukang Rp 105,000.00 Rp 10,500.00
0.050 Org/ Hr Mandor Rp 140,000.00 Rp 7,000.00
C ALAT

D JUMLAH (A+B+C) Rp 759,300.00


E 14.000 % Over Head + Profit (14% x D) Rp 106,302.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 865,602.00

5.1.1.17 PerMen No 28-PRT-M-2016


Memasang 1 buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm
A BAHAN
20.000 Bh Hollow Block Rp 1,800.00 Rp 36,000.00
15.000 Kg Portland Cement Rp 1,280.00 Rp 19,200.00
0.100 m3 Pasir Pasang Rp 126,500.00 Rp 12,650.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 87,500.00 Rp 43,750.00
0.250 Org/ Hr Tukang batu Rp 90,000.00 Rp 22,500.00
0.100 Org/ Hr Kepala tukang Rp 105,000.00 Rp 10,500.00
0.050 Org/ Hr Mandor Rp 140,000.00 Rp 7,000.00
C ALAT

D JUMLAH (A+B+C) Rp 151,600.00


E 14.000 % Over Head + Profit (14% x D) Rp 21,224.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 172,824.00

5.1.1.16 PerMen No 28-PRT-M-2016


Memasang 1 buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm
A BAHAN
15.000 Bh Hollow Block Rp 1,800.00 Rp 27,000.00
10.000 Kg Portland Cement Rp 1,280.00 Rp 12,800.00
0.080 m3 Pasir Pasang Rp 126,500.00 Rp 10,120.00
B TENAGA
0.100 Org/ Hr Pekerja Rp 87,500.00 Rp 8,750.00
0.100 Org/ Hr Tukang batu Rp 90,000.00 Rp 9,000.00
0.050 Org/ Hr Kepala tukang Rp 105,000.00 Rp 5,250.00
0.010 Org/ Hr Mandor Rp 140,000.00 Rp 1,400.00
C ALAT

D JUMLAH (A+B+C) Rp 74,320.00


E 14.000 % Over Head + Profit (14% x D) Rp 10,404.80
F HARGA SATUAN PEKERJAAN (D+E) Rp 84,724.80
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
5.1.1.33 PerMen No 28-PRT-M-2016
Memasang 1 bh Bak Cuci Piring Stainles Steel
A BAHAN
1.000 Bh Kitchen Zink Rp 630,000.00 Rp 630,000.00
B TENAGA
0.030 Org/ Hr Pekerja Rp 87,500.00 Rp 2,625.00
0.300 Org/ Hr Tukang batu Rp 90,000.00 Rp 27,000.00
0.030 Org/ Hr Kepala tukang Rp 105,000.00 Rp 3,150.00
0.002 Org/ Hr Mandor Rp 140,000.00 Rp 210.00
C ALAT

D JUMLAH (A+B+C) Rp 662,985.00


E 14.000 % Over Head + Profit (14% x D) Rp 92,817.90
F HARGA SATUAN PEKERJAAN (D+E) Rp 755,802.90

Analisa Terapan
Memasang 1 bh Kran Ø ¾" atau ½"
A BAHAN
1.000 Bh Kran Air Rp 341,250.00 Rp 341,250.00
0.025 bh Seal Tape Rp 7,875.00 Rp 196.88
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 25,000.00 Rp 25,000.00
C ALAT

D JUMLAH (A+B+C) Rp 366,446.88


E 14.000 % Over Head + Profit (14% x D) Rp 51,302.56
F HARGA SATUAN PEKERJAAN (D+E) Rp 417,749.44

5.1.1.35 PerMen No 28-PRT-M-2016


Memasang 1 bh Kran Wastafel
A BAHAN
1.000 Bh Kran Air Wastafel 1 Rp 315,000.00 Rp 315,000.00
0.025 bh Seal Tape Rp 7,875.00 Rp 196.88
B TENAGA
0.010 Org/ Hr Pekerja Rp 87,500.00 Rp 875.00
0.100 Org/ Hr Tukang batu Rp 90,000.00 Rp 9,000.00
0.010 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,050.00
0.005 Org/ Hr Mandor Rp 140,000.00 Rp 700.00
C ALAT

D JUMLAH (A+B+C) Rp 326,821.88


E 14.000 % Over Head + Profit (14% x D) Rp 45,755.06
F HARGA SATUAN PEKERJAAN (D+E) Rp 372,576.94
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 bh Roof Drain
A BAHAN
1.000 Bh Roof Drain Rp 262,500.00 Rp 262,500.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 87,500.00 Rp 875.00
0.100 Org/ Hr Tukang batu Rp 90,000.00 Rp 9,000.00
0.010 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,050.00
0.005 Org/ Hr Mandor Rp 140,000.00 Rp 700.00
C ALAT

D JUMLAH (A+B+C) Rp 274,125.00


E 14.000 % Over Head + Profit (14% x D) Rp 38,377.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 312,502.50

5.1.1.36 PerMen No 28-PRT-M-2016


Memasang 1 bh Floor Drain
A BAHAN
1.000 Bh Floor drain Rp 214,287.50 Rp 214,287.50
0.025 bh Seal Tape Rp 7,875.00 Rp 196.88
B TENAGA
0.010 Org/ Hr Pekerja Rp 87,500.00 Rp 875.00
0.100 Org/ Hr Tukang batu Rp 90,000.00 Rp 9,000.00
0.010 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,050.00
0.005 Org/ Hr Mandor Rp 140,000.00 Rp 700.00
C ALAT

D JUMLAH (A+B+C) Rp 226,109.38


E 14.000 % Over Head + Profit (14% x D) Rp 31,655.31
F HARGA SATUAN PEKERJAAN (D+E) Rp 257,764.69

Analisa Terapan
Memasang 1 bh Towel Bar
A BAHAN
1.000 Bh Towel Bar Rp 178,500.00 Rp 178,500.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 87,500.00 Rp 875.00
0.100 Org/ Hr Tukang batu Rp 90,000.00 Rp 9,000.00
0.010 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,050.00
0.005 Org/ Hr Mandor Rp 140,000.00 Rp 700.00
C ALAT

D JUMLAH (A+B+C) Rp 190,125.00


E 14.000 % Over Head + Profit (14% x D) Rp 26,617.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 216,742.50
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 bh Soap Holder
A BAHAN
1.000 Bh Soap Holder Rp 99,750.00 Rp 99,750.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 87,500.00 Rp 875.00
0.100 Org/ Hr Tukang batu Rp 90,000.00 Rp 9,000.00
0.010 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,050.00
0.005 Org/ Hr Mandor Rp 140,000.00 Rp 700.00
C ALAT

D JUMLAH (A+B+C) Rp 111,375.00


E 14.000 % Over Head + Profit (14% x D) Rp 15,592.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 126,967.50

Analisa Terapan
Memasang 1 bh Liquid Soap Dispenser
A BAHAN
1.000 Bh Liquid Soap Dispenser Rp 506,100.00 Rp 506,100.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 87,500.00 Rp 875.00
0.100 Org/ Hr Tukang batu Rp 90,000.00 Rp 9,000.00
0.010 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,050.00
0.005 Org/ Hr Mandor Rp 140,000.00 Rp 700.00
C ALAT

D JUMLAH (A+B+C) Rp 517,725.00


E 14.000 % Over Head + Profit (14% x D) Rp 72,481.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 590,206.50

Analisa Terapan
Memasang 1 bh Jet Washer Kloset Duduk
A BAHAN
1.000 Bh Jet Washer Rp 416,850.00 Rp 416,850.00
0.025 bh Seal Tape Rp 7,875.00 Rp 196.88
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 25,000.00 Rp 25,000.00
C ALAT

D JUMLAH (A+B+C) Rp 442,046.88


E 14.000 % Over Head + Profit (14% x D) Rp 61,886.56
F HARGA SATUAN PEKERJAAN (D+E) Rp 503,933.44
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 m Saluran Air Hujan Lebar 30 cm Tinggi 50 cm
A 0.015 m3 Pasir beton Rp 126,500.00 Rp 1,897.50
20.000 Kg Portland Cement Rp 1,280.00 Rp 25,600.00
42.000 Bh Bata merah Rp 1,000.00 Rp 42,000.00
0.081 M3 Pasir pasang Rp 126,500.00 Rp 10,246.50
B TENAGA
0.500 Org/ Hr Pekerja Rp 87,500.00 Rp 43,750.00
0.250 Org/ Hr Tukang batu Rp 90,000.00 Rp 22,500.00
0.100 Org/ Hr Kepala tukang Rp 105,000.00 Rp 10,500.00
0.050 Org/ Hr Mandor Rp 140,000.00 Rp 7,000.00
C ALAT

D JUMLAH (A+B+C) Rp 163,494.00


E 14.000 % Over Head + Profit (14% x D) Rp 22,889.16
F HARGA SATUAN PEKERJAAN (D+E) Rp 186,383.16

Analisa Terapan
Memasang 1 Buah Roof Water Tank Type Stainless 2500 Ltr
BAHAN
1.000 Bh Roof Water Tank Type Stainless Kap. 2500 Liter
Rp 9,975,000.00 Rp 9,975,000.00
UPAH
1.000 Ls Instalasi Dan Pemasangan Rp 500,000.00 Rp 500,000.00
ALAT

JUMLAH (A+B+C) Rp 10,475,000.00


14.000 % Over Head + Profit (14% x D) Rp 1,466,500.00
HARGA SATUAN PEKERJAAN (D+E) Rp 11,941,500.00

Analisa Terapan
Memasang Mesin Pompa Transfer
BAHAN
A 1.000 Bh Mesin Pompa Transfer Rp 5,470,500.00 Rp 5,470,500.00
1.000 Ls Alat Bantu Rp 109,410.00 Rp 109,410.00
B TENAGA
1.000 Org/ Hr Pekerja Rp 87,500.00 Rp 87,500.00
1.000 Org/ Hr Tukang Listrik Rp 90,000.00 Rp 90,000.00
0.500 Org/ Hr Kepala tukang Rp 105,000.00 Rp 52,500.00
0.250 Org/ Hr Mandor Rp 140,000.00 Rp 35,000.00
C ALAT

D JUMLAH (A+B+C) Rp 5,844,910.00


E 14.000 % Over Head + Profit (14% x D) Rp 818,287.40
F HARGA SATUAN PEKERJAAN (D+E) Rp 6,663,197.40
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang Mesin Pompa Booster
A BAHAN
1.000 Bh Mesin Pompa Booster Rp 6,772,500.00 Rp 6,772,500.00
1.000 Ls Alat Bantu Rp 135,450.00 Rp 135,450.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 87,500.00 Rp 43,750.00
0.500 Org/ Hr Tukang Listrik Rp 90,000.00 Rp 45,000.00
0.100 Org/ Hr Kepala tukang Rp 105,000.00 Rp 10,500.00
0.050 Org/ Hr Mandor Rp 140,000.00 Rp 7,000.00
C ALAT

D JUMLAH (A+B+C) Rp 7,014,200.00


E 14.000 % Over Head + Profit (14% x D) Rp 981,988.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 7,996,188.00

Analisa Terapan
Memasang 1 Unit Water Level Control
A BAHAN
1.000 Bh Water Level Control Rp 210,000.00 Rp 210,000.00
B TENAGA
0.083 Org/ Hr Pekerja Rp 87,500.00 Rp 7,291.67
0.083 Org/ Hr Tukang Pipa Rp 90,000.00 Rp 7,500.00
0.042 Org/ Hr Mandor Rp 140,000.00 Rp 5,833.33
C ALAT

D JUMLAH (A+B+C) Rp 230,625.00


E 14.000 % Over Head + Profit (14% x D) Rp 32,287.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 262,912.50

Analisa Terapan
Memasang 1 Bh Gate Valve Diameter 65mm / 10 K Type Screw
A BAHAN
1.000 Bh Gate Valve Ø 65mm / 10K Type Screw Rp 1,575,000.00 Rp 1,575,000.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 75,000.00 Rp 75,000.00
C ALAT

D JUMLAH (A+B+C) Rp 1,650,000.00


E 14.000 % Over Head + Profit (14% x D) Rp 231,000.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,881,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Bh Valve Dia. 1"
A BAHAN
1.000 Bh Valve Ø 1" Rp 99,750.00 Rp 99,750.00
B TENAGA
0.083 Org/ Hr Pekerja Rp 87,500.00 Rp 7,291.67
0.083 Org/ Hr Tukang Pipa Rp 90,000.00 Rp 7,500.00
0.042 Org/ Hr Mandor Rp 140,000.00 Rp 5,833.33
C ALAT

D JUMLAH (A+B+C) Rp 120,375.00


E 14.000 % Over Head + Profit (14% x D) Rp 16,852.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 137,227.50

Analisa Terapan
Memasang 1 Bh Valve Dia. 1/2"
A BAHAN
1.000 Bh Valve Ø 1/2" Rp 47,250.00 Rp 47,250.00
B TENAGA
0.083 Org/ Hr Pekerja Rp 87,500.00 Rp 7,291.67
0.083 Org/ Hr Tukang Pipa Rp 90,000.00 Rp 7,500.00
0.042 Org/ Hr Mandor Rp 140,000.00 Rp 5,833.33
C ALAT

D JUMLAH (A+B+C) Rp 67,875.00


E 14.000 % Over Head + Profit (14% x D) Rp 9,502.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 77,377.50

5.1.1.25 PerMen No 28-PRT-M-2016


Memasang 1 m' Pipa PVC tipe AW Ø ½"
A BAHAN
1.200 m' Pipa PVC Type AW 1/2" Rp 6,790.00 Rp 8,148.00
0.300 Ls Accessories (30% Material) Rp 8,148.00 Rp 2,444.40
B TENAGA
0.036 Org/ Hr Pekerja Rp 87,500.00 Rp 3,150.00
0.060 Org/ Hr Tukang batu Rp 90,000.00 Rp 5,400.00
0.006 Org/ Hr Kepala tukang Rp 105,000.00 Rp 630.00
0.002 Org/ Hr Mandor Rp 140,000.00 Rp 252.00
C ALAT

D JUMLAH (A+B+C) Rp 20,024.40


E 14.000 % Over Head + Profit (14% x D) Rp 2,803.42
F HARGA SATUAN PEKERJAAN (D+E) Rp 22,827.82
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
5.1.1.26 PerMen No 28-PRT-M-2016
Memasang 1 m' Pipa PVC tipe AW Ø ¾"
A BAHAN
1.200 m' Pipa PVC Type AW 3/4" Rp 9,345.00 Rp 11,214.00
0.300 Ls Accessories (30% Material) Rp 11,214.00 Rp 3,364.20
B TENAGA
0.036 Org/ Hr Pekerja Rp 87,500.00 Rp 3,150.00
0.060 Org/ Hr Tukang batu Rp 90,000.00 Rp 5,400.00
0.006 Org/ Hr Kepala tukang Rp 105,000.00 Rp 630.00
0.002 Org/ Hr Mandor Rp 140,000.00 Rp 252.00
C ALAT

D JUMLAH (A+B+C) Rp 24,010.20


E 14.000 % Over Head + Profit (14% x D) Rp 3,361.43
F HARGA SATUAN PEKERJAAN (D+E) Rp 27,371.63

5.1.1.27 PerMen No 28-PRT-M-2016


Memasang 1 m' Pipa PVC tipe AW Ø 1"
A BAHAN
1.200 m' Pipa PVC Type AW 1" Rp 12,468.75 Rp 14,962.50
0.300 Ls Accessories (30% Material) Rp 14,962.50 Rp 4,488.75
B TENAGA
0.036 Org/ Hr Pekerja Rp 87,500.00 Rp 3,150.00
0.060 Org/ Hr Tukang batu Rp 90,000.00 Rp 5,400.00
0.006 Org/ Hr Kepala tukang Rp 105,000.00 Rp 630.00
0.002 Org/ Hr Mandor Rp 140,000.00 Rp 252.00
C ALAT

D JUMLAH (A+B+C) Rp 28,883.25


E 14.000 % Over Head + Profit (14% x D) Rp 4,043.66
F HARGA SATUAN PEKERJAAN (D+E) Rp 32,926.91

5.1.1.28 PerMen No 28-PRT-M-2016


Memasang 1 m' Pipa PVC tipe AW Ø 1½"
A BAHAN
1.200 m' Pipa PVC Type AW 1 1/2" Rp 20,606.25 Rp 24,727.50
0.300 Ls Accessories (30% Material) Rp 24,727.50 Rp 7,418.25
B TENAGA
0.054 Org/ Hr Pekerja Rp 87,500.00 Rp 4,725.00
0.090 Org/ Hr Tukang batu Rp 90,000.00 Rp 8,100.00
0.009 Org/ Hr Kepala tukang Rp 105,000.00 Rp 945.00
0.003 Org/ Hr Mandor Rp 140,000.00 Rp 420.00
C ALAT

D JUMLAH (A+B+C) Rp 46,335.75


E 14.000 % Over Head + Profit (14% x D) Rp 6,487.01
F HARGA SATUAN PEKERJAAN (D+E) Rp 52,822.76
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
5.1.1.29 PerMen No 28-PRT-M-2016
Memasang 1 m' Pipa PVC tipe AW Ø 2"
A BAHAN
1.200 m' Pipa PVC Type AW 2" Rp 30,231.25 Rp 36,277.50
0.300 Ls Accessories (30% Material) Rp 36,277.50 Rp 10,883.25
B TENAGA
0.054 Org/ Hr Pekerja Rp 87,500.00 Rp 4,725.00
0.090 Org/ Hr Tukang batu Rp 90,000.00 Rp 8,100.00
0.009 Org/ Hr Kepala tukang Rp 105,000.00 Rp 945.00
0.003 Org/ Hr Mandor Rp 140,000.00 Rp 420.00
C ALAT

D JUMLAH (A+B+C) Rp 61,350.75


E 14.000 % Over Head + Profit (14% x D) Rp 8,589.11
F HARGA SATUAN PEKERJAAN (D+E) Rp 69,939.86

5.1.1.31 PerMen No 28-PRT-M-2016


Memasang 1 m' Pipa PVC tipe AW Ø 3"
A BAHAN
1.200 m' Pipa PVC Type AW 3" Rp 53,812.50 Rp 64,575.00

B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 20,000.00 Rp 20,000.00
C ALAT

D JUMLAH (A+B+C) Rp 84,575.00


E 14.000 % Over Head + Profit (14% x D) Rp 11,840.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 96,415.50

Analisa Terapan
Memasang 1 m' Pipa PVC tipe AW Ø 4"
A BAHAN
1.200 m' Pipa PVC Type AW 4" Rp 100,625.00 Rp 120,750.00

B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 30,000.00 Rp 30,000.00
C ALAT

D JUMLAH (A+B+C) Rp 150,750.00


E 14.000 % Over Head + Profit (14% x D) Rp 21,105.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 171,855.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Mengerjakan 1 Unit Septictank 2
A BAHAN
814.813 Kg Portland Cement Rp 1,280.00 Rp 1,042,960.54
1640.000 Bh Bata Merah Rp 1,000.00 Rp 1,640,000.00
0.330 M3 Pasir Urug Rp 103,500.00 Rp 34,155.00
8.944 M3 Pasir Pasang Rp 126,500.00 Rp 1,131,380.58
784.270 Kg Pasir beton (Kg) Rp 90.36 Rp 70,864.38
1004.182 Kg Koral Beton (Kg) Rp 123.33 Rp 123,849.14
123.093 Kg Besi Beton (Polos/ulir) Rp 12,500.00 Rp 1,538,662.50
18.370 m' Kawat beton Rp 17,731.48 Rp 325,725.54
0.095 M3 Kayu Kelas III Rp 2,000,000.00 Rp 189,600.00
0.672 Kg Paku 5 cm – 12 cm Rp 22,750.00 Rp 15,288.00
16.452 Liter Minyak bekisting Rp 4,725.00 Rp 77,735.70
211.775 Liter Air Rp 100.00 Rp 21,177.50
0.231 M2 Plywood 9 mm Rp 127,833.33 Rp 29,529.50
3.960 Btg Dolken kayu galam, φ (8–10) cm Rp 45,000.00 Rp 178,200.00
8.000 m' Pipa PVC Type AW 4" Rp 100,625.00 Rp 805,000.00
2.000 Unit Manhole Rp 100,000.00 Rp 200,000.00
B UPAH
1.000 Ls Pembuatan Rp 1,500,000.00 Rp 1,500,000.00
C ALAT

D JUMLAH (A+B+C) Rp 8,924,128.38


E 14.000 % Over Head + Profit (14% x D) Rp 1,249,377.97
F HARGA SATUAN PEKERJAAN (D+E) Rp 10,173,506.35

ANALISA PEKERJAAN ELEKTRIKAL


Analisa Terapan
Memasang 1 Titik Instalasi Daya AC - 1 Phase
A BAHAN
15.000 M' Kabel NYM 3 x 2,5 mm Rp 12,022.50 Rp 180,337.50
1.000 Bh Isolasi Ban Rp 5,250.00 Rp 5,250.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 60,000.00 Rp 60,000.00
C ALAT

D JUMLAH (A+B+C) Rp 245,587.50


E 14.000 % Over Head + Profit (14% x D) Rp 34,382.25
F HARGA SATUAN PEKERJAAN (D+E) Rp 279,969.75
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Titik Instalasi AC - 3 Phase
A BAHAN
2.000 Bh T Dos 3 way 20 mm Rp 6,300.00 Rp 12,600.00
2.000 Bh Las Dop Rp 525.00 Rp 1,050.00
15.000 M' Kabel NYM 3 x 2,5 mm Rp 12,022.50 Rp 180,337.50
15.000 M' Pipa Conduit 20mm Rp 3,762.50 Rp 56,437.50
0.200 Bh Isolasi Ban Rp 5,250.00 Rp 1,050.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 70,000.00 Rp 70,000.00
C ALAT

D JUMLAH (A+B+C) Rp 321,475.00


E 14.000 % Over Head + Profit (14% x D) Rp 45,006.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 366,481.50

Analisa Terapan
Memasang 1 Titik Instalasi Penerangan
A BAHAN
2.000 Bh T Dos 3 way 20 mm Rp 6,300.00 Rp 12,600.00
2.000 Bh Las Dop Rp 525.00 Rp 1,050.00
9.000 M' Kabel NYM 3 x 2,5 mm Rp 12,022.50 Rp 108,202.50
9.000 M' Pipa Conduit 20mm Rp 3,762.50 Rp 33,862.50
0.200 Bh Isolasi Ban Rp 5,250.00 Rp 1,050.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 40,000.00 Rp 40,000.00
C ALAT

D JUMLAH (A+B+C) Rp 196,765.00


E 14.000 % Over Head + Profit (14% x D) Rp 27,547.10
F HARGA SATUAN PEKERJAAN (D+E) Rp 224,312.10

Analisa Terapan
Memasang 1 Titik Instalasi Speaker
A BAHAN
15.000 M' Pipa Conduit 20mm Rp 3,762.50 Rp 56,437.50
1.000 Bh Socket Pipa Rp 1,050.00 Rp 1,050.00
2.000 Bh T Dos 3 way 20 mm Rp 6,300.00 Rp 12,600.00
15.000 M' Kabel NYMHY 2 x 1,5 mm Rp 5,250.00 Rp 78,750.00
0.250 Bh Isolasi Ban Rp 5,250.00 Rp 1,312.50
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 70,000.00 Rp 70,000.00
C ALAT

D JUMLAH (A+B+C) Rp 220,150.00


E 14.000 % Over Head + Profit (14% x D) Rp 30,821.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 250,971.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Titik Instalasi MATV
A BAHAN
15.000 M' Pipa Conduit 20mm Rp 3,762.50 Rp 56,437.50
1.000 Bh Socket Pipa Rp 1,050.00 Rp 1,050.00
2.000 Bh T Dos 3 way 20 mm Rp 6,300.00 Rp 12,600.00
15.000 M' Kabel Coaxial 5C-2V 75 Ohm Rp 5,250.00 Rp 78,750.00
0.250 Bh Isolasi Ban Rp 5,250.00 Rp 1,312.50
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 150,000.00 Rp 150,000.00
C ALAT

D JUMLAH (A+B+C) Rp 300,150.00


E 14.000 % Over Head + Profit (14% x D) Rp 42,021.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 342,171.00

Analisa Terapan
Memasang 1 Unit Panel SDP
A BAHAN
1.000 Bh MCCB 100-125 A/3 Phasa Rp 2,160,165.00 Rp 2,160,165.00
1.000 Bh MCCB 50 A/3 Phasa Rp 1,323,630.00 Rp 1,323,630.00
1.000 Bh MCCB 63-80 A/3 Phasa Rp 1,281,000.00 Rp 1,281,000.00
1.000 Bh MCCB 20 A/3 Phasa Rp 955,500.00 Rp 955,500.00
2.000 Bh MCB 16 A/3 Phasa Rp 399,000.00 Rp 798,000.00
1.000 Bh Volt Meter 0-500 V EC 96 Rp 167,895.00 Rp 167,895.00
3.000 Bh Ampere Meter 800/5A EC 96 Rp 167,265.00 Rp 501,795.00
3.000 Bh Pilot Lamp Rp 26,250.00 Rp 78,750.00
1.000 Bh Switch Voltmeter Rp 105,000.00 Rp 105,000.00
1.000 Bh Current Transformer Rp 210,000.00 Rp 210,000.00
3.000 Set Fuse Kubur Rp 21,000.00 Rp 63,000.00
1.000 Unit Box Panel ( 40x60x20 ) cm Rp 577,500.00 Rp 577,500.00
1.000 Ls Material Bantu Rp 216,016.50 Rp 216,016.50
1.000 Set - CU Bars
1.000 Set - Sepatu Kabel
1.000 Set - Roll Isolator
1.000 Set - Spiral Duck Kabel
1.000 Set - Duck Kabel
1.000 Set - Mur Baut
B UPAH
1.000 Ls Perakitan, Pemasangan Dan Terminasi Rp 2,500,000.00 Rp 2,500,000.00
C ALAT

D JUMLAH (A+B+C) Rp 10,938,251.50


E 14.000 % Over Head + Profit (14% x D) Rp 1,531,355.21
F HARGA SATUAN PEKERJAAN (D+E) Rp 12,469,606.71
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Unit Panel LP-1
A BAHAN
1.000 Bh MCCB 40 A/3 Phasa Rp 2,422,350.00 Rp 2,422,350.00
6.000 Bh MCB 6 A/1 Phasa Rp 56,700.00 Rp 340,200.00
8.000 Bh MCB 10 A/1 Phasa Rp 56,700.00 Rp 453,600.00
8.000 Bh MCB 16 A/1 Phasa Rp 56,700.00 Rp 453,600.00
3.000 Bh Pilot Lamp Rp 26,250.00 Rp 78,750.00
3.000 Set Fuse Kubur Rp 21,000.00 Rp 63,000.00
1.000 Unit Box Panel ( 30x40x20 ) cm Rp 336,000.00 Rp 336,000.00
1.000 Ls Material Bantu Rp 726,705.00 Rp 726,705.00
1.000 Set - CU Bars
1.000 Set - Sepatu Kabel
1.000 Set - Roll Isolator
1.000 Set - Spiral Duck Kabel
1.000 Set - Duck Kabel
1.000 Set - Mur Baut
B UPAH
1.000 Ls Perakitan, Pemasangan Dan Terminasi Rp 1,500,000.00 Rp 1,500,000.00
C ALAT

D JUMLAH (A+B+C) Rp 6,374,205.00


E 14.000 % Over Head + Profit (14% x D) Rp 892,388.70
F HARGA SATUAN PEKERJAAN (D+E) Rp 7,266,593.70

Analisa Terapan
Memasang 1 Unit Panel PP-Pompa
A BAHAN
4.000 Bh MCCB 30 A/3 Phasa Rp 1,284,885.00 Rp 5,139,540.00
1.000 Bh MCB 6 A/1 Phasa Rp 56,700.00 Rp 56,700.00
1.000 Bh Kontaktor 3 Phase Rp 244,125.00 Rp 244,125.00
1.000 Bh Over Load Rp 332,640.00 Rp 332,640.00
1.000 Bh Switch Auto Manual Rp 105,000.00 Rp 105,000.00
1.000 Bh Push Button Rp 157,500.00 Rp 157,500.00
4.000 Bh Pilot Lamp Rp 26,250.00 Rp 105,000.00
3.000 Set Fuse Kubur Rp 21,000.00 Rp 63,000.00
1.000 Unit Box Panel ( 30x40x20 ) cm Rp 336,000.00 Rp 336,000.00
1.000 Ls Material Bantu Rp 17,010.00 Rp 17,010.00
1.000 Set - CU Bars
1.000 Set - Sepatu Kabel
1.000 Set - Roll Isolator
1.000 Set - Spiral Duck Kabel
1.000 Set - Duck Kabel
1.000 Set - Mur Baut
B UPAH
1.000 Ls Perakitan, Pemasangan Dan Terminasi Rp 1,500,000.00 Rp 1,500,000.00
C ALAT

D JUMLAH (A+B+C) Rp 2,916,975.00


E 14.000 % Over Head + Profit (14% x D) Rp 408,376.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 3,325,351.50

Analisa Terapan
Memasang 1 Unit Panel PP-AC1
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
A BAHAN
1.000 Bh MCCB 63-80 A/3 Phasa Rp 1,281,000.00 Rp 1,281,000.00
33.000 Bh MCB 16 A/1 Phasa Rp 56,700.00 Rp 1,871,100.00
3.000 Bh Pilot Lamp Rp 26,250.00 Rp 78,750.00
3.000 Set Fuse Kubur Rp 21,000.00 Rp 63,000.00
1.000 Unit Box Panel ( 30x40x20 ) cm Rp 336,000.00 Rp 336,000.00
1.000 Ls Material Bantu Rp 945,630.00 Rp 945,630.00
1.000 Set - CU Bars
1.000 Set - Sepatu Kabel
1.000 Set - Roll Isolator
1.000 Set - Spiral Duck Kabel
1.000 Set - Duck Kabel
1.000 Set - Mur Baut
B UPAH
1.000 Ls Perakitan, Pemasangan Dan Terminasi Rp 1,500,000.00 Rp 1,500,000.00
C ALAT

D JUMLAH (A+B+C) Rp 6,075,480.00


E 14.000 % Over Head + Profit (14% x D) Rp 850,567.20
F HARGA SATUAN PEKERJAAN (D+E) Rp 6,926,047.20

Analisa Terapan
Memasang 1 Unit Spliter 4 way
A BAHAN
1.000 Unit Spliter 4 way Rp 263,550.00 Rp 263,550.00
B TENAGA
0.667 Org/ Hr Pekerja Rp 87,500.00 Rp 58,333.63
0.667 Org/ Hr Tukang Listrik Rp 90,000.00 Rp 60,000.30
0.333 Org/ Hr Mandor Rp 140,000.00 Rp 46,666.20
C ALAT

D JUMLAH (A+B+C) Rp 428,550.13


E 14.000 % Over Head + Profit (14% x D) Rp 59,997.02
F HARGA SATUAN PEKERJAAN (D+E) Rp 488,547.14

Analisa Terapan
Memasang 1 Bh Socket TV
A BAHAN
1.000 Bh Socket TV Rp 139,545.00 Rp 139,545.00
B TENAGA
0.167 Org/ Hr Pekerja Rp 87,500.00 Rp 14,583.63
0.167 Org/ Hr Tukang Listrik Rp 90,000.00 Rp 15,000.30
0.083 Org/ Hr Mandor Rp 140,000.00 Rp 11,662.00
C ALAT

D JUMLAH (A+B+C) Rp 180,790.93


E 14.000 % Over Head + Profit (14% x D) Rp 25,310.73
F HARGA SATUAN PEKERJAAN (D+E) Rp 206,101.65
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Buah Volume Control
A BAHAN
1.000 Bh Volume Control Rp 183,750.00 Rp 183,750.00
B TENAGA
0.050 Org/ Hr Pekerja Rp 87,500.00 Rp 4,375.00
0.100 Org/ Hr Tukang Listrik Rp 90,000.00 Rp 9,000.00
C ALAT

D JUMLAH (A+B+C) Rp 197,125.00


E 14.000 % Over Head + Profit (14% x D) Rp 27,597.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 224,722.50

Analisa Terapan
Memasang 1 Buah Grid Swtich 6 Gang
A BAHAN
1.000 Bh Grid Switch 6 Gang Rp 183,750.00 Rp 183,750.00
1.000 m Kabel NYM 3 x 2,5 mm Rp 12,022.50 Rp 12,022.50
1.000 m Inbow Dus Rp 5,250.00 Rp 5,250.00
1.000 Bh Pipa Conduit 20mm Rp 3,762.50 Rp 3,762.50
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 15,000.00 Rp 15,000.00
C ALAT

D JUMLAH (A+B+C) Rp 219,785.00


E 14.000 % Over Head + Profit (14% x D) Rp 30,769.90
F HARGA SATUAN PEKERJAAN (D+E) Rp 250,554.90

Analisa Terapan
Memasang 1 Buah Saklar Tunggal
A BAHAN
1.000 Bh Saklar Tunggal Tanam Rp 28,875.00 Rp 28,875.00
1.000 m Kabel NYM 3 x 2,5 mm Rp 12,022.50 Rp 12,022.50
1.000 m Inbow Dus Rp 5,250.00 Rp 5,250.00
1.000 Bh Pipa Conduit 20mm Rp 3,762.50 Rp 3,762.50
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 15,000.00 Rp 15,000.00
C ALAT

D JUMLAH (A+B+C) Rp 64,910.00


E 14.000 % Over Head + Profit (14% x D) Rp 9,087.40
F HARGA SATUAN PEKERJAAN (D+E) Rp 73,997.40
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Buah Saklar Ganda
A BAHAN
1.000 Bh Saklar Double Tanam Rp 28,350.00 Rp 28,350.00
1.000 m Kabel NYM 3 x 2,5 mm Rp 12,022.50 Rp 12,022.50
1.000 m Inbow Dus Rp 5,250.00 Rp 5,250.00
1.000 Bh Pipa Conduit 20mm Rp 3,762.50 Rp 3,762.50
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 15,000.00 Rp 15,000.00
C ALAT

D JUMLAH (A+B+C) Rp 64,385.00


E 14.000 % Over Head + Profit (14% x D) Rp 9,013.90
F HARGA SATUAN PEKERJAAN (D+E) Rp 73,398.90

Analisa Terapan
Memasang 1 Buah Stop Kontak Lantai
A BAHAN
1.000 Bh Stop Kontak Lantai Rp 420,000.00 Rp 420,000.00
2.000 m Kabel NYM 3 x 2,5 mm Rp 12,022.50 Rp 24,045.00
1.000 m Inbow Dus Rp 5,250.00 Rp 5,250.00
2.000 Bh Pipa Conduit 20mm Rp 3,762.50 Rp 7,525.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 20,000.00 Rp 20,000.00
C ALAT

D JUMLAH (A+B+C) Rp 476,820.00


E 14.000 % Over Head + Profit (14% x D) Rp 66,754.80
F HARGA SATUAN PEKERJAAN (D+E) Rp 543,574.80

Analisa Terapan
Memasang 1 Buah Stop Kontak Tanam
A BAHAN
1.000 Bh Stop Kontak Tanam 1 lubang Rp 25,200.00 Rp 25,200.00
1.000 Bh Kabel NYM 2 x 2,5 mm Rp 9,450.00 Rp 9,450.00
1.000 Bh Inbow Dus Rp 5,250.00 Rp 5,250.00
1.000 m' Pipa Conduit 20mm Rp 3,762.50 Rp 3,762.50
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 15,000.00 Rp 15,000.00
C ALAT

D JUMLAH (A+B+C) Rp 58,662.50


E 14.000 % Over Head + Profit (14% x D) Rp 8,212.75
F HARGA SATUAN PEKERJAAN (D+E) Rp 66,875.25
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Buah Stop Kontak AC
A BAHAN
1.000 Bh Stop Kontak Tanam AC Rp 61,950.00 Rp 61,950.00
1.000 m Kabel NYM 3 x 2,5 mm Rp 12,022.50 Rp 12,022.50
1.000 Bh Inbow Dus Rp 5,250.00 Rp 5,250.00
1.000 m Pipa Conduit 20mm Rp 3,762.50 Rp 3,762.50
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 15,000.00 Rp 15,000.00
C ALAT

D JUMLAH (A+B+C) Rp 97,985.00


E 14.000 % Over Head + Profit (14% x D) Rp 13,717.90
F HARGA SATUAN PEKERJAAN (D+E) Rp 111,702.90

Analisa Terapan
Memasang 1 Buah Lampu Baret Kotak LED 18 Watt
A BAHAN
1.000 Bh Lampu Baret Kotak LED 18 Watt Rp 162,750.00 Rp 162,750.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 20,000.00 Rp 20,000.00
C ALAT

D JUMLAH (A+B+C) Rp 182,750.00


E 14.000 % Over Head + Profit (14% x D) Rp 25,585.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 208,335.00

Analisa Terapan
Memasang 1 Buah Downlight 4 Inch + Lampu Bulb LED 18 Watt
A BAHAN
1.000 Bh Downlight 4 Inch (frame cool white) Rp 68,250.00 Rp 68,250.00
1.000 Bh Lampu Bulb LED 18 watt Rp 231,000.00 Rp 231,000.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 17,500.00 Rp 17,500.00
C ALAT

D JUMLAH (A+B+C) Rp 316,750.00


E 14.000 % Over Head + Profit (14% x D) Rp 44,345.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 361,095.00

Analisa terapan
Memasang 1 Buah Downlight 4 Inch + Lampu Bulb LED 6 Watt
A BAHAN
1.000 Bh Downlight 4 Inch (frame cool white) Rp 68,250.00 Rp 68,250.00
1.000 Bh Lampu Bulb LED 6 watt Rp 60,375.00 Rp 60,375.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 17,500.00 Rp 17,500.00
C ALAT

D JUMLAH (A+B+C) Rp 146,125.00


E 14.000 % Over Head + Profit (14% x D) Rp 20,457.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 166,582.50

Analisa Terapan
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Memasang 1 Buah Lampu Taman
A BAHAN
1.000 Bh Lampu Taman Rp 1,732,500.00 Rp 1,732,500.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 25,000.00 Rp 25,000.00
C ALAT

D JUMLAH (A+B+C) Rp 1,757,500.00


E 14.000 % Over Head + Profit (14% x D) Rp 246,050.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 2,003,550.00

Analisa Terapan
Memasang 1 Buah Lampu Hias
A BAHAN
1.000 Bh Lampu Hias Circle Light Rp 4,937,835.00 Rp 4,937,835.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 25,000.00 Rp 25,000.00
C ALAT

D JUMLAH (A+B+C) Rp 4,962,835.00


E 14.000 % Over Head + Profit (14% x D) Rp 694,796.90
F HARGA SATUAN PEKERJAAN (D+E) Rp 5,657,631.90

Analisa Terapan
Memasang 1 Buah Lampu TL / RM
A BAHAN
1.000 Bh Lampu TL LED 2x16 W (RMI) Reflektor Rp 556,500.00 Rp 556,500.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 25,000.00 Rp 25,000.00
C ALAT

D JUMLAH (A+B+C) Rp 581,500.00


E 14.000 % Over Head + Profit (14% x D) Rp 81,410.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 662,910.00

Analisa Terapan
Memasang 1 Unit Exhaust Fan 10 Inch
A BAHAN
1.000 Bh Exhaust Fan 10 Inch Rp 420,000.00 Rp 420,000.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 25,000.00 Rp 25,000.00
C ALAT

D JUMLAH (A+B+C) Rp 445,000.00


E 14.000 % Over Head + Profit (14% x D) Rp 62,300.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 507,300.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 m Kabel NYY 4 x 25 mm
A BAHAN
1.100 m Kabel NYY 4 x 25 mm Rp 187,250.00 Rp 205,975.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 25,000.00 Rp 25,000.00
C ALAT

D JUMLAH (A+B+C) Rp 230,975.00


E 14.000 % Over Head + Profit (14% x D) Rp 32,336.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 263,311.50

Analisa Terapan
Memasang 1 m Kabel NYY 4 x 10 mm
A BAHAN
1.100 m Kabel NYY 4 x 10 mm Rp 85,400.00 Rp 93,940.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 20,000.00 Rp 20,000.00
C ALAT

D JUMLAH (A+B+C) Rp 113,940.00


E 14.000 % Over Head + Profit (14% x D) Rp 15,951.60
F HARGA SATUAN PEKERJAAN (D+E) Rp 129,891.60

Analisa Terapan
Memasang 1 m Kabel NYY 4 x 4 mm2
A BAHAN
1.100 m Kabel NYY 4 x 4 mm Rp 43,400.00 Rp 47,740.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 15,000.00 Rp 15,000.00
C ALAT

D JUMLAH (A+B+C) Rp 62,740.00


E 14.000 % Over Head + Profit (14% x D) Rp 8,783.60
F HARGA SATUAN PEKERJAAN (D+E) Rp 71,523.60

Analisa Terapan
Memasang 1 m Kabel Cat 6
A BAHAN
1.100 m Kabel Cat 6 Rp 22,960.00 Rp 25,256.00
1.100 m Pipa Conduit 20mm Rp 3,762.50 Rp 4,138.75
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 7,500.00 Rp 7,500.00
C ALAT

D JUMLAH (A+B+C) Rp 36,894.75


E 14.000 % Over Head + Profit (14% x D) Rp 5,165.27
F HARGA SATUAN PEKERJAAN (D+E) Rp 42,060.02
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 m Kable Tray Uk 40x10
A BAHAN
1.100 m Kable Tray Uk 40x10 Rp 388,500.00 Rp 427,350.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 70,000.00 Rp 70,000.00
C ALAT

D JUMLAH (A+B+C) Rp 497,350.00


E 14.000 % Over Head + Profit (14% x D) Rp 69,629.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 566,979.00

Analisa Terapan
Memasang 1 Buah Ceiling Speaker
A BAHAN
1.000 Bh Ceiling Speaker Rp 210,000.00 Rp 210,000.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 20,000.00 Rp 20,000.00
C ALAT

D JUMLAH (A+B+C) Rp 230,000.00


E 14.000 % Over Head + Profit (14% x D) Rp 32,200.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 262,200.00

Analisa Terapan
Memasang 1 Unit Column Speaker
A BAHAN
1.000 Bh Column Speaker Rp 777,000.00 Rp 777,000.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 20,000.00 Rp 20,000.00
C ALAT

D JUMLAH (A+B+C) Rp 797,000.00


E 14.000 % Over Head + Profit (14% x D) Rp 111,580.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 908,580.00

Analisa Terapan
Memasang 1 Buah Horn Speaker
A BAHAN
1.000 Bh Horn Speaker Rp 1,157,520.00 Rp 1,157,520.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 20,000.00 Rp 20,000.00
C ALAT

D JUMLAH (A+B+C) Rp 1,177,520.00


E 14.000 % Over Head + Profit (14% x D) Rp 164,852.80
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,342,372.80
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Buah Lampu Emergency
A BAHAN
1.000 Bh Lampu Emergency Rp 367,500.00 Rp 367,500.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 20,000.00 Rp 20,000.00
C ALAT

D JUMLAH (A+B+C) Rp 387,500.00


E 14.000 % Over Head + Profit (14% x D) Rp 54,250.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 441,750.00

Analisa Terapan
Memasang 1 Unit Power Amplifier 1x120 W
A BAHAN
1.000 Bh Power Amplifier 120 Watt Rp 2,887,500.00 Rp 2,887,500.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 150,000.00 Rp 150,000.00
C ALAT

D JUMLAH (A+B+C) Rp 3,037,500.00


E 14.000 % Over Head + Profit (14% x D) Rp 425,250.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 3,462,750.00

Analisa Terapan
Memasang 1 Unit Mic Paging
A BAHAN
1.000 Bh Mic Paging Rp 840,000.00 Rp 840,000.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 20,000.00 Rp 20,000.00
C ALAT

D JUMLAH (A+B+C) Rp 860,000.00


E 14.000 % Over Head + Profit (14% x D) Rp 120,400.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 980,400.00

Analisa Terapan
Memasang 1 Unit Mixer Frame w/ Module
A BAHAN
1.000 Bh Mixer Frame w/ Module Rp 5,617,500.00 Rp 5,617,500.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 87,500.00 Rp 43,750.00
0.500 Org/ Hr Tukang Listrik Rp 90,000.00 Rp 45,000.00
0.167 Org/ Hr Mandor Rp 140,000.00 Rp 23,333.80
C ALAT

D JUMLAH (A+B+C) Rp 5,729,583.80


E 14.000 % Over Head + Profit (14% x D) Rp 802,141.73
F HARGA SATUAN PEKERJAAN (D+E) Rp 6,531,725.53
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Unit Terminal Box
A BAHAN
1.000 Bh Terminal Box Rp 482,370.00 Rp 482,370.00
B TENAGA
1.000 Ls Instalasi Dan Pemasangan Rp 350,000.00 Rp 350,000.00
C ALAT

D JUMLAH (A+B+C) Rp 832,370.00


E 14.000 % Over Head + Profit (14% x D) Rp 116,531.80
F HARGA SATUAN PEKERJAAN (D+E) Rp 948,901.80

Analisa Terapan
Memasang 1 m Down Conductor BC 50 mm
A BAHAN
1.000 m' Kabel BC 50 mm Rp 50,050.00 Rp 50,050.00
B TENAGA
0.036 Org/ Hr Pekerja Rp 87,500.00 Rp 3,150.00
0.060 Org/ Hr Tukang Listrik Rp 90,000.00 Rp 5,400.00
0.002 Org/ Hr Mandor Rp 140,000.00 Rp 252.00
C ALAT

D JUMLAH (A+B+C) Rp 58,852.00


E 14.000 % Over Head + Profit (14% x D) Rp 8,239.28
F HARGA SATUAN PEKERJAAN (D+E) Rp 67,091.28

Analisa Terapan
Memasang 1 Bh Stik Penangkal Petir
A BAHAN
1.000 Unit Stik Ujung Penangkal Petir Rp 47,250.00 Rp 47,250.00
B UPAH
1.000 Ls Pemasangan Rp 5,000.00 Rp 5,000.00
C ALAT

D JUMLAH (A+B+C) Rp 52,250.00


E 14.000 % Over Head + Profit (14% x D) Rp 7,315.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 59,565.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
ANALISA PEKERJAAN LAIN-LAIN
Analisa Terapan
Memasang 1 m2 Batu Sikat
A BAHAN
1.100 m2 Batu Sikat Rp 73,333.33 Rp 80,666.67
23.500 kg Portland Cement Rp 1,280.00 Rp 30,080.00
0.035 m3 Pasir Pasang Rp 126,500.00 Rp 4,427.50
B TENAGA
0.700 Org/ Hr Pekerja Rp 87,500.00 Rp 61,250.00
0.750 Org/ Hr Tukang batu Rp 90,000.00 Rp 67,500.00
0.035 Org/ Hr Kepala tukang Rp 105,000.00 Rp 3,675.00
0.035 Org/ Hr Mandor Rp 140,000.00 Rp 4,900.00
C ALAT

D JUMLAH (A+B+C) Rp 252,499.17


E 14.000 % Over Head + Profit (14% x D) Rp 35,349.88
F HARGA SATUAN PEKERJAAN (D+E) Rp 287,849.05

Analisa Terapan
Memasang 1 m2 Allumunium Composit + Rangka Besi Hollow
A BAHAN
1.100 m2 Allumunium Composite Panel Type PVDF Rp 423,273.31 Rp 465,600.64
12.300 m' Besi Hollow 4x4 cm Rp 16,036.56 Rp 197,249.63
1.00 Ls Pengelasan (20 % Panjang Rangka) Rp 39,449.93 Rp 39,449.93
1.000 Ls Alat Bantu (Mesin Bor Listrik) Rp 4,500.00 Rp 4,500.00
B UPAH
1.000 Ls Pabrikasi Dan Pemasangan Rp 175,000.00 Rp 175,000.00
C ALAT

D JUMLAH (A+B+C) Rp 881,800.20


E 14.000 % Over Head + Profit (14% x D) Rp 123,452.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,005,252.23

Analisa Terapan
Memasang 1 m Profil Besi Hollow Stainless Steel 2
A BAHAN
1.700 M' Stainless Steel Besi Kotak 2x4 Rp 62,500.00 Rp 106,250.00
1.100 M' Stainless Steel Besi Kotak 4x4 Rp 91,666.67 Rp 100,833.33
1.00 Ls Pengelasan + Poles Rp 5,000.00 Rp 5,000.00
1.00 Ls Material Bantu Rp 21,250.00 Rp 21,250.00
B UPAH
1.000 Ls Perakitan, Pemasangan Dan Perapian Rp 100,000.00 Rp 100,000.00
C ALAT

D JUMLAH (A+B+C) Rp 333,333.33


E 14.000 % Over Head + Profit (14% x D) Rp 46,666.67
F HARGA SATUAN PEKERJAAN (D+E) Rp 380,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI BERAT PUSKESMAS BIROMARU


SATUAN KERJA : DINAS KESEHATAN KABUPATEN SIGI
LOKASI : DESA MPANAU KEC. BIROMARU
TAHUN ANGGARAN : 2019

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 m Profil Besi Hollow Kamuflase Oudoor AC
A BAHAN
15.840 M' Besi Hollow 2x4 cm Rp 11,416.67 Rp 180,840.00
4.200 M' Besi Hollow 4x4 cm Rp 16,036.56 Rp 67,353.53
1.00 Ls Pengelasan Rp 15,000.00 Rp 15,000.00
1.00 Set Kunci Dan Engsel Rp 15,000.00 Rp 15,000.00
0.25 Kg Cat Besi Rp 77,070.00 Rp 19,267.50
B UPAH
1.000 Ls Perakitan, Pemasangan Dan Perapian Rp 250,000.00 Rp 250,000.00
C ALAT

D JUMLAH (A+B+C) Rp 547,461.03


E 14.000 % Over Head + Profit (14% x D) Rp 76,644.54
F HARGA SATUAN PEKERJAAN (D+E) Rp 624,105.58

Analisa Terapan
1 m2 Pekerjaan Screed 1Pc:5PP
A BAHAN
5.184 kg Portland Cement Rp 1,280.00 Rp 6,635.52
0.026 m3 Pasir Pasang Rp 126,500.00 Rp 3,289.00
B TENAGA
0.300 Org/ Hr Pekerja Rp 87,500.00 Rp 26,250.00
0.150 Org/ Hr Tukang batu Rp 90,000.00 Rp 13,500.00
0.015 Org/ Hr Kepala tukang Rp 105,000.00 Rp 1,575.00
0.015 Org/ Hr Mandor Rp 140,000.00 Rp 2,100.00
C ALAT

D JUMLAH (A+B+C) Rp 53,349.52


E 14.000 % Over Head + Profit (14% x D) Rp 7,468.93
F HARGA SATUAN PEKERJAAN (D+E) Rp 60,818.45

Analisa Terapan
Mengerjakan 1m2 Waterproofing Coating
A BAHAN
0.500 kg Waterproofing Rp 45,625.00 Rp 22,812.50
B TENAGA
0.020 Org/ Hr Pekerja Rp 87,500.00 Rp 1,750.00
0.030 Org/ Hr Tukang batu Rp 90,000.00 Rp 2,700.00
0.003 Org/ Hr Kepala tukang Rp 105,000.00 Rp 315.00
0.003 Org/ Hr Mandor Rp 140,000.00 Rp 420.00
C ALAT

D JUMLAH (A+B+C) Rp 27,997.50


E 14.000 % Over Head + Profit (14% x D) Rp 3,919.65
F HARGA SATUAN PEKERJAAN (D+E) Rp 31,917.15
DAFTAR HARGA SATUAN UPAH KERJA
I II III IV
Harga Satuan
NO Uraian Satuan
( Rp )
1 Pekerja OH Rp 87,500
2 Tukang Batu OH Rp 90,000
3 Tukang Kayu OH Rp 90,000
4 Tukang Besi OH Rp 90,000
5 Tukang Listrik OH Rp 90,000
6 Tukang Pipa OH Rp 90,000
7 Tukang Allumunium OH Rp 90,000
8 Tukang Cat OH Rp 90,000
9 Kepala tukang OH Rp 105,000
10 Mandor OH Rp 140,000
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
A. AGREGAT & KAYU
3
1 Balok Kayu Kelas II m Rp 3,000,000
2 Batu Kali m3 Rp 170,000
3 Batu belah 15 cm/20 cm m3 Rp 269,840
4 Dolken kayu galam, φ (8–10) cm Btg Rp 45,000
3
5 Kayu kelas III m Rp 2,000,000
3
6 Koral Beton m Rp 166,500
7 Koral Beton (Kg) Kg Rp 123
3
8 Pasir beton m Rp 126,500
9 Pasir beton (Kg) kg Rp 90
3
10 Pasir pasang m Rp 126,500
11 Pasir urug m3 Rp 103,500
12 Tanah Urug m3 Rp 120,000

B. BAHAN BANGUNAN
1 Air Ltr Rp 100
2 Bata merah Bh Rp 1,000
2
3 Batu Sikat m Rp 73,333
4 Besi Beton (Polos/ulir) Kg Rp 12,500
5 Besi Hollow 2x4 cm m Rp 11,417
6 Besi Hollow 4x4 cm m Rp 16,037
7 Cat Besi Kg Rp 77,070
8 Cat Dasar Kg Rp 42,252
9 Cat Tembok Kg Rp 37,800
10 Cat Penutup 2 Kg Rp 37,800
11 Genteng Metal Soka m2 Rp 67,200
12 Gypsum board 120x240 cm, tebal 9mm Lbr Rp 75,625
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
13 Homogenous Tile 60x60 cm Bh Rp 62,733
14 High Laminate Pressure (HPL) m2 Rp 200,000
15 Hollow Block Bh Rp 1,800
16 Kalsiboard 3,5 mm M2 Rp 23,633
17 Kawat beton kg Rp 17,731
18 Kawat Diameter 4 mm kg Rp 36,750
19 keramik 50x50 cm Bh Rp 35,000
20 Keramik 20x40 cm Bh Rp 8,077
21 List profil Gypsum m’ Rp 15,758
22 Minyak bekisting Ltr Rp 4,725
23 Paku 5 cm – 12 cm Kg Rp 22,750
24 Plywood 5 mm Lbr Rp 97,000
25 Plywood 9 mm Lbr Rp 127,833
26 Portland Cement Kg Rp 1,280
27 Semen warna Kg Rp 17,833
28 Tepung Gypsum Kg Rp 4,217
29 Waterproofing Kg Rp 45,625

C. BAHAN ALLUMUNIUM & KACA


1 Allumunium Composite Panel Type PVDF m2 Rp 423,273
2 Allumunium Siku m' Rp 7,500
3 Allumunium Spigot m' Rp 23,625
4 Casement Handle Bh Rp 27,300
5 Engsel Pintu Kupu-kupu Bh Rp 86,678
6 Engsel Tanam Bh Rp 820,260
7 Flush Bolt / Grandel Pintu Engsel Tanam Bh Rp 78,120
8 Friction Stay (Engsel Casement) 14" Bh Rp 161,774
2
9 Kaca Bening 5 mm m Rp 136,000
2
10 Kaca Temperet Laminated 12 mm m Rp 789,917
11 Kunci Tanam Pintu Allumunium Bh Rp 146,814
12 Patch Fitting PT40 Set Rp 818,958
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
13 Patch Fitting PT10 Set Rp 493,458
14 Patch Lock Set Rp 921,816
15 Profil alluminium Openbek "Profil C" m’ Rp 49,923
16 Profil alluminium "M" m’ Rp 58,905
17 Profil alluminium "Jeep" m’ Rp 54,275
18 Profil alluminium "Ambang Datar Atas" m’ Rp 30,299
19 Profil alluminium "Ambang Datar Bawah" m’ Rp 46,803
20 Profil alluminium "Ambang Datar Tegak" m’ Rp 39,659
21 Profil alluminium "Stoper Casement" m’ Rp 26,850
22 Profil alluminium "Frame Casement" m’ Rp 35,882
23 Profil alluminium "Bead Casement" m’ Rp 13,671
24 Profil alluminium "Tutup Kaca Mati" m’ Rp 28,246
25 Profil alluminium "Tutup Jeep" m’ Rp 20,117
26 Profil Alluminium Hollow 1x1/2 m' Rp 15,274
27 Pull Handle Stainless 38x1000 Bh Rp 1,123,626
28 Pull Handle Stainless 32x300 Bh Rp 472,626
29 Ramset bh Rp 3,675
30 Rangka Metal Hollow 2x4 m’ Rp 4,375
31 Rangka Metal Hollow 4x4 m’ Rp 6,125
32 Reng R 32-0,45 m' Rp 8,225
33 Screw Bremick bh Rp 126
34 Self Drilling Screw dia-10x16mm (truss screw)
Bh Rp 189
35 Self Drilling Screw dia-10x40mm (Roof Button
Bh Screw)
Rp 441
36 Smartruss C 75.65 m Rp 15,225
37 Sealant m' Rp 6,563
38 Seal Tape Roll Rp 7,875
39 Stainless Steel Besi Kotak 2x4 m' Rp 62,500
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
D. KOMPONEN ELEKTRIKAL
1 Ampere Meter 800/5A EC 96 Unit Rp 167,265
2 Box Panel ( 30x40x20 ) cm Unit Rp 336,000
3 Box Panel ( 40x60x20 ) cm Unit Rp 577,500
4 Ceiling Speaker bh Rp 210,000
5 Column Speaker bh Rp 777,000
6 Current Transformer Bh Rp 210,000
7 Downlight 4 Inch (frame cool white) Set Rp 68,250
8 Fuse Kubur Unit Rp 21,000
9 Grid Switch 6 Gang Bh Rp 183,750
10 Horn Speaker Bh Rp 1,157,520
11 Inbow Dus Bh Rp 5,250
12 Isolasi Ban Bh Rp 5,250
13 Kabel Cat 6 m Rp 22,960
14 Kabel NYY 4 x 25 mm m Rp 187,250
15 Kabel NYY 4 x 10 mm m Rp 85,400
16 Kabel NYY 4 x 4 mm m Rp 43,400
17 Kabel NYM 2 x 2,5 mm m Rp 9,450
18 Kabel NYM 3 x 2,5 mm m Rp 12,023
19 Kabel NYMHY 2 x 1,5 mm m' Rp 5,250
20 Kabel BC 50 mm m' Rp 50,050
21 Kable Tray Uk 40x10 m' Rp 388,500
22 Kontaktor 3 Phase Bh Rp 244,125
23 Lampu Baret Kotak LED 18 Watt Bh Rp 162,750
24 Lampu Emergency Bh Rp 367,500
25 Lampu Bulb LED 18 watt Bh Rp 231,000
26 Lampu Bulb LED 6 watt Bh Rp 60,375
27 Lampu TL LED 2x16 W (RMI) Reflektor Set Rp 556,500
28 Lampu Hias Circle Light Bh Rp 4,937,835
29 Lampu Taman Bh Rp 1,732,500
30 Las Dop Bh Rp 525
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
31 MCCB 100-125 A/3 Phasa Bh Rp 2,160,165
32 MCCB 63-80 A/3 Phasa Bh Rp 1,281,000
33 MCCB 50 A/3 Phasa Bh Rp 1,323,630
34 MCCB 40 A/3 Phasa Bh Rp 2,422,350
35 MCCB 30 A/3 Phasa Bh Rp 1,284,885
36 MCCB 20 A/3 Phasa Bh Rp 955,500
37 MCB 16 A/3 Phasa Bh Rp 399,000
38 MCB 16 A/1 Phasa Bh Rp 56,700
39 MCB 10 A/1 Phasa Bh Rp 56,700
40 MCB 6 A/1 Phasa Bh Rp 56,700
41 Mic Paging Bh Rp 840,000
42 Mixer Frame w/ Module Bh Rp 5,617,500
43 Over Load bh Rp 332,640
44 Power Amplifier 120 Watt Bh Rp 2,887,500
45 Pilot Lamp Bh Rp 26,250
46 Pipa Conduit 20mm m Rp 3,763
47 Push Button Pcs Rp 157,500
48 Saklar Double Tanam bh Rp 28,350
49 Saklar Tunggal Tanam bh Rp 28,875
50 Socket Pipa bh Rp 1,050
51 Socket TV bh Rp 139,545
52 Stik Ujung Penangkal Petir bh Rp 47,250
53 Spliter 4 way Unit Rp 263,550
54 Stop Kontak Tanam AC bh Rp 61,950
55 Stop Kontak Lantai bh Rp 420,000
56 Stop Kontak Tanam 1 lubang bh Rp 25,200
57 Switch Auto Manual bh Rp 105,000
58 Switch Voltmeter bh Rp 105,000
59 T Dos 3 way 20 mm bh Rp 6,300
60 Terminal Box bh Rp 482,370
61 Volume Control bh Rp 183,750
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
62 Volt Meter 0-500 V EC 96 bh Rp 167,895

E. KOMPONEN MEKANIKAL DAN PLUMBING


1 Exhaust Fan 10 Inch Bh Rp 420,000
2 Cermin Bh Rp 715,050
3 Floor drain Bh Rp 214,288
4 Gate Valve Ø 65mm / 10K Type Screw Bh Rp 1,575,000
5 Jet Washer Bh Rp 416,850
6 Kitchen Zink Bh Rp 630,000
7 Kloset Duduk Bh Rp 2,951,463
8 Kran Air Wastafel 1 Bh Rp 315,000
9 Kran Air Bh Rp 341,250
10 Liquid Soap Dispenser Bh Rp 506,100
11 Mesin Pompa Booster Unit Rp 6,772,500
12 Mesin Pompa Transfer Unit Rp 5,470,500
13 Pipa PVC Type AW 1/2" m' Rp 6,790
14 Pipa PVC Type AW 3/4" m' Rp 9,345
15 Pipa PVC Type AW 1" m' Rp 12,469
16 Pipa PVC Type AW 1 1/2" m' Rp 20,606
17 Pipa PVC Type AW 2" m' Rp 30,231
18 Pipa PVC Type AW 3" m' Rp 53,813
19 Pipa PVC Type AW 4" m' Rp 100,625
20 Roof Drain Bh Rp 262,500
21 Roof Water Tank Type Stainless Kap. 2500 Liter
Bh Rp 9,975,000
22 Soap Holder Bh Rp 99,750
23 Towel Bar Bh Rp 178,500
24 Valve Ø 1" Bh Rp 99,750
25 Valve Ø 1/2" Bh Rp 47,250
26 Wastafel 2 Bh Rp 1,470,000
27 Water Level Control Unit Rp 210,000
29 Sticker Sandblast m2 Rp 262,500