RENCANA ANGGARAN BIAYA PEMBANGUNAN MCK DAN SUMUR BOR

LOKASI : Kantor Desa Sinarlaut. RT. 001. RW. 001

NO URAIAN PEKERJAAN VOLUME SATUAN HARGA HARGA


SATUAN
I. PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bowplank 51.84 m2 15,000 777,600
2 Galian Pondasi 8.32 m3 30,000 249,600
3 Galian Tanah 43.6 m3 20,000 872,000
3 Urugan Kembali 8.37 m3 5,000 41,850
JUMLAH 1,941,050
II. PEKERJAAN PONDASI DAN PLESTERAN
1 Pas. Pondasi Batu Belah 1PC:6pp 11,30 m3 491,581 5,554,865
2 Pas. Dinding 1/2 batu 1 pc :3 kpr : 10 pp 128.68 m2 78,283 10,073,456
3 Plesteran Dinding 1 pc: 3 kpr : 8 pp 257.36 m2 21,115 5,434,156
4 Acian 257.36 m2 10,300 2,650,808
5 Benang 150,50 m2 9,674 #VALUE!
6 Pasang Glass Block 10 buah 27,388 273,880
7 Ban-Banan 15 cm 13,20 m2 20,555 #VALUE!
8 Pasang Angin Angin Kayu 12 buah 42,458 509,496
JUMLAH 26,223,925
III. PEKERJAAN BETON BERTULANG
1 Pondasi Plat Beton K 255 1.66 m3 1,752,642 2,909,386
2 Slof Struktur Beton K 225 15/25 0.97 m3 3,117,333 3,023,813
3 Kolom Struktur Beton K 225 15/30 4.1 m3 2,547,471 10,444,631
4 Kolom Beton Praktis 12/12 0.18 m3 2,621,273 471,829
5 Balok Struktur Beton K 225 Gantung 20/30 1,92 m3 2,547,471 #VALUE!
6 Balok Latel Beton 12/15 0,06 m3 2,380,630 #VALUE!
7 Ring Balok Beton Praktis 12/25 1,08 m3 2,639,912 #VALUE!
8 Dak Atap Beton Tebal 10 cm 2,97 m3 2,435,778 #VALUE!
JUMLAH 31,969,007
IV. PLAFOND
1 Pekerjaan List Gipsun 43,29 m2 10,000 #VALUE!
JUMLAH 432,900
V. PEKERJAAN KERAMIK DAN BATU ALAM
1 Pekerjaan Kramik Ruang Utama 40x40 27,14 m2 92,769 #VALUE!
2 Pekerjaan Kramik Rteras 40x40 16,56 m2 92,796 #VALUE!
3 Pekerjaan Kramik Lantai WC / KM 20x20 9,60 m2 92,704 #VALUE!
4 Pekerjaan Kramik Dinding KM / WC 20 x 25 13,44 m2 88,978 #VALUE!
5 Pekerjaan Kramik Plin Lantai 8 x 40 20,63 m2 27,532 #VALUE!
6 Pekerjaan dinding Batu Alur 3,68 m2 86,178 #VALUE!
JUMLAH 7,025,395
VI. PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Galvalum 40,70 m2 162,000 6,593,400
2 Pekerjaan Pasang Genteng Beton Besar 57.01 m2 55,875 3,185,434
3 Pekerjaan Pasang Bubungan Beton 16,00 m2 47,215 755,440
4 Pekerjaan Listplank tebal 12 mm 37,56 m2 28,893 #VALUE!
JUMLAH 11,619,495
HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA
SATUAN
VII. PEKERJAAN KUSEN, DAN PINTU DAN JENDELA
1 Pekerjaan Kusen Daun Pintu dan Jendela 21,44 m 75,000 #VALUE!
2 Pekerjaan Daun Jendela 4,00 bh 250,000 #VALUE!
3 Pekerjaan Daun Pintu Kaca 4,00 bh 400,000 #VALUE!
4 Engsel Pintu 5* 4,00 bh 30,750 #VALUE!
5 Slot Pintu 2,00 bh 148,750 #VALUE!
6 Grendel Pintu Tanam 2,00 bh 25,700 #VALUE!
7 Engsel Jendela 3* 4,00 bh 23,250 #VALUE!
8 Grendel Jendela 4,00 bh 9,375 #VALUE!
9 Hak Angin 4,00 bh 9,375 #VALUE!
10 Pintu KM/WC PVC 2 bh 271,000 542,000
JUMLAH 5,389,900
VIII. PEKERJAAN SANITA AIR DAN PENGEBOTAN
1 Pek. Saluran Air Kotor da Air Hujan PVC 4* 27,00 m 40,285 #VALUE!
2 Pek. Saluran Tinja C 4* 6,00 m 40,285 #VALUE!
3 Pek. Jaringan Air Bersih PVC AW 1/2* 13,50 m 13,289 #VALUE!
4 Kloset Jongkok ex INA Warna Terang 2,00 bh 165,250 #VALUE!
5 Titik Kran 1/2* 10,00 bh 24,250 #VALUE!
6 Beerpoot 100x300 1,00 unit 1,280,440 #VALUE!
7 Pengeboran 150 M 50,000 7,500,000
JUMLAH 10,862,247
IX. PEKERJAAN CAT
1 Cat Dinding Exterior ex Komilex 257,36 m2 15,432 3,971,580
2 Cat Plafond ex Paragon 51,84 m2 16,173 838,408
3 Cat Genteng, Bubungan dan Listplank 75,76 m2 11,804 894,271
4 Cat Daun Pintu Panel ex, Mowilex 4,00 bh 150,000 600,000
JUMLAH 6,304,259
X. PEKERJAAN ELEKTRIKAL
Intalasi Titik Lampu 10,00 bh 85,000 850,000
Intalasi Titik Stop Kontak 4,00 bh 85,000 340,000
MCB Box 1,00 bh 85,000 85,000
ELCB 1,00 bh 60,000 60,000
JUMLAH 1,335,000
XI. PEMASANGAN AIR DAN LISTRIK
Biaya Pasang Baru Listrik 1,00 bh 1,500,000 1,500,000
Pompa Air ( Sanyo ) 1,00 bh 100,000 100,000

JUMLAH 1,600,000
RENCANA ANGGARAN PEMBELANJAAN

LOKASI : Wisata Pantai Cemara Sinarlaut. Kp. Tipar. RT. 004. RW. 002
HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA
SATUAN
XII ALAT MATRIAL
1 Batu Bata 10,000 biji 1,000 10,000,000
2 Pasir 5 Mobil 1,000,000 5,000,000
3 Semen 150 Sak 66,000 9,900,000
4 Batu Cur / Sprit 8 Pik Up 250,000 2,000,000
5 Besi Beton 100 Batang 45,000 4,500,000
6 Keramik Dinding 11 Meter 40,000 440,000
7 Keramik Lantai 70 Meter 50,000 3,500,000
8 Keramik Bak Air 10 Meter 39,000 390,000
9 Pipa PVC. 1 Inch 20 Batang 25,000 500,000
10 Pipa PVC. 4 Inch 10 Batang 50,000 500,000
11 Pintu TL 7 Buah 600,000 4,200,000
12 Kayu Reng. 2 x 3 400 Batang 25,000 10,000,000
13 Kayu Atap Usuk. 4 x 6 300 Batang 75,000 22,500,000
14 Kayu Atap Balok. 12 x 6 80 Batang 325,000 26,000,000
15 Jendela 7 buah 230,000 1,610,000
JUMLAH 101,040,000

JUMLAH. I, II, III, IV. V, VI, VII, VIII. IX, X, XI, XII 205,743,177

Sinarlaut, 07 Juni 2021


Kepala Desa Sinarlaut

SURAHMAN. S.Ag