HARGA
NO JENIS BAHAN UKURAN SAT.
Rp.
1 2 3 4 6
1 Kayu jati balok kualitas II, ex. Bojonegoro 6/12, 6/15, 8/12 m3 25,000,000.00
(mutu kayu klas I)
2 Kayu jati usuk kualitas II ex. bojonegoro 4/6, 5/7 m3 23,500,000.00
(mutu kayu klas I)
3 Kayu jati papan kualitas II ex. Bojonegoro 2/20, 3/20, 3/25 m3 26,500,000.00
(mutu kayu klas I)
4 Kayu jati reng kualitas II ex. Bojonegoro 2/3, 3/5 m3 22,500,000.00
(mutu kayu klas I)
5 Kayu jati Balok kualitas I, lokal 6/12, 6/15, 8/12 m3 16,000,000.00
(mutu kayu klas I)
6 Kayu jati usuk kualitas I, lokal 4/6, 5/7 m3 13,500,000.00
(mutu kayu klas I)
7 Kayu jati papan kualitas I, lokal 2/20, 3/20, 3/25 m3 17,500,000.00
(mutu kayu klas I)
8 Kayu jati reng kualitas I, Lokal 2/3, 3/5 m3 11,500,000.00
(mutu kayu klas I)
9 Kayu kamper balok (mutu kayu klas II) 6/12, 6/15, 8/12 m3 6,500,000.00
10 Kayu kamper papan (mutu kayu klas II) 2/20, 3/20, 3/25 m3 7,250,000.00
11 Kayu kamper usuk (mutu kayu klas II) 4/6, 5/7 m3 6,400,000.00
12 Kayu kamper reng (mutu kayu klas II) 2/3, 3/5 m3 6,100,000.00
13 Kayu meranti balok (mutu kayu klas III) 6/12, 6/15, 8/12 m3 4,000,000.00
14 Kayu meranti papan (mutu kayu klas III) 2/20, 3/20, 3/25 m3 4,600,000.00
15 Kayu meranti usuk (mutu kayu klas III) 4/6, 5/7 m3 3,700,000.00
16 Kayu meranti reng (mutu kayu klas III) 2/3, 3/5 m3 3,600,000.00
17 Kayu begesting ( papan randu/sengon ) 3/20 - 200 m3 375,000.00
(mutu kayu klas IV)
18 Kayu begesting ( usuk kayu sengon ) 4/6 - 200 m3 900,000.00
(mutu kayu klas IV)
19 Papan begesting kayu tahun (mutu kayu klas IV) 2/20 - 200 m3 1,500,000.00
20 Reng begesting kayu tahun (mutu kayu klas IV) 3/5 - 400 m3 1,300,000.00
21 kayu Gelam (mutu kayu klas IV) Dia 10 - 12 x 400 cm Btg 11,500.00
22 Kayu kruing balok (mutu klas III) 6/12, 6/15, 8/12 m3 4,800,000.00
23 Kayu kruing papan (mutu klas III) 2/20, 3/20, 3/25 m3 5,400,000.00
24 Kayu kruing usuk (mutu klas III) 4/6, 5/7 m3 4,500,000.00
25 Kayu kruing reng (mutu klas III) 2/3, 3/5 m3 4,000,000.00
26 Kayu balau balok (mutu klas II) 6/12, 6/15, 8/12 m3 6,450,000.00
27 Kayu balau papan (mutu klas II) 2/20, 3/20, 3/25 m3 7,250,000.00
28 Kayu balau usuk (mutu klas II) 4/6, 5/7 m3 6,300,000.00
29 Kayu balau reng (mutu klas II) 2/3, 3/5 m3 6,200,000.00
30 Kayu Albasiah (mutu klas IV) - m3 1,000,000.00
31 List kayu tahun 1/4 m' 3,500.00
32 list kayu profil 4/4 m' 5,500.00
33 list kayu profil 5/5 m' 6,000.00
34 Bambu Jawa bongkotan Dia.10-12 x 300cm bt 12,000.00
35 Bambu Ori Dia.10-12 x 300cm bt 16,000.00
36 Bambu Apus Dia.6-10 x 600cm bt 9,000.00
37 Gedek Guling - m2 5,000.00
38 Daun Pintu Kayu Balau, Kualitas 1 90 X 210 lbr 900,000.00
39 Daun Pintu Jati, Kualitas 1 90 X 210 lbr 1,600,000.00
1 2 3 4
1 2 3 4
-
VI BAHAN UNTUK PENGECATAN -
1 Cat besi Emco - kg 50,000.00
2 Cat kayu Emco - kg 50,000.00
3 Meni besi / kayu cap Pedang - kg 15,000.00
4 Tinner A Special - lt 17,000.00
5 Tinner A biasa - lt 11,000.00
6 Tinner B spesial - lt 7,000.00
7 Minyak cat / afduner - lt 6,000.00
8 Cat Tembok eksterior Movilek kg 75,000.00
9 Cat Tembok Alcabond kg 23,000.00
10 Cat Tembok Alcaplast kg 30,000.00
11 Cat Tembok Wallsealer kg 54,000.00
12 Cat tembok Vinilek, Avian paint - kg 14,000.00
13 Cat tembok Decolith - kg 13,000.00
14 Cat tembok Metrolith - kg 15,000.00
15 Cat tembok Catylac - kg 14,000.00
16 Cat tembok Cendana kg 24,000.00
17 Cat genteng Matex kg 19,000.00
18 Serlak " Kripik India " kg 87,500.00
19 Politur Impra - lt 32,000.00
20 Wood Filter " Impra " lt 24,000.00
21 Wood Stain " Impra " lt 49,000.00
22 Sanding Sealer " Impra " lt 31,000.00
23 Vernis ( Glotex ) - lt 25,000.00
24 Dempul plitur ( Impra ) - kg 25,000.00
25 Dempul Plitur kualitas sedang - kg 20,000.00
26 Plitur batangan - btg 16,000.00
27 Teer - lt 6,500.00
28 Kertas gosok - lbr 2,500.00
29 Water proof, Aquaproof Pro Seller - kg 42,500.00
30 Waterproof, Multiroof - kg 38,000.00
31 WaterpRoof, Nippon Paint Shield - kg 38,000.00
32 Plamur tembok - kg 6,000.00
33 Plamur kayu - kg 15,000.00
34 Plamur besi - kg 22,000.00
35 Spiritus - lt 9,000.00
36 Lem Kayu Rajawali Untuk Kayu - kg 26,000.00
37 Lem Kayu Rajawali Untuk Tembok kg 10,000.00
38 Lem Vinyl/lem kayu khusus - kg 9,000.00
39 Soda api - kg 10,000.00
40 Teak oil - lt 25,000.00
41 Kuas 3" - bh 6,000.00
42 Kuas 4" - bh 12,000.00
43 Kuas 5" - bh 15,000.00
43 Kalsium - kg 950.00
44 Coating kg 33,000.00
-
VII BAHAN PENGGANTUNG & PENGUNCI -
1 Engsel H - set 10,000.00
2 Engsel kuningan arch asli - set 14,000.00
3 Engsel jendela kupu-kupu - set 7,500.00
4 Engsel pintu " UNION " 4" set 13,000.00
5 Engsel jendela " UNION " 3" set 9,000.00
6 Grendel AEG - bh 21,000.00
7 Grendel biasa ( besar ) - bh 6,500.00
8 Grendel biasa ( kecil ) - bh 4,000.00
9 Grendel kuningan/cromm ( kecil ) 4" bh 9,000.00
10 Grendel Tanam Besar 60 cm set 45,000.00
11 kunci gembok besar Globe 4" bh 21,000.00
12 Kunci gembok sedang "globe 3" bh 15,000.00
13 Kunci tanam (088) - bh 7,000.00
14 Slot Cap KUDA ( 2 X putaran) bh 57,000.00
15 Kunci Tanam " SES" besar ( tanpa Handel) bh 100,000.00
16 Kunci Tanam Antik " Miller" ( tanpa Handel) bh 94,000.00
17 Kunci Tanam KM / WC " Miller" - bh 50,000.00
18 Kunci silinder bh 63,000.00
19 Kunci selot 2 putaran merk " YALE " (asli) bh 88,500.00
20 Kunci selot 2 putaran merk " CAVEL " bh 103,000.00
21 Kunci lemari, Wing - bh 6,000.00
22 Hak Angin Biasa 8" bh 5,000.00
23 Hak angin 4 mm ( lurus )/plat ( 4 x 150) mm bh 9,500.00
24 Pegangan pintu model standar p= 20 cm bh 34,500.00
25 Hak angin ( sikutan ) - set 9,500.00
26 Hak angin lurus (bisa disetel maju/mundur) set 44,000.00
27 Sping knip - bh 8,000.00
28 Dor closer - bh 202,000.00
29 Dor stop - bh 10,500.00
30 Rel pintu dorong, Biasa - btg 80,000.00
31 Rel pintu dorong J4 SES - btg 156,000.00
-
VIII BAHAN SANITAIR -
1 slang spiral saluran Pembuangan Bak Cuci - set 32,000.00
2 slang spiral saluran kran wastafel set 25,000.00
3 Kloset duduk porselin komplit ( INA ) - bh 875,000.00
4 Kloset duduk porselin komplit ( KIA ) - bh 950,000.00
5 1 - bh 1,650,000.00
6 Kloset jongkok porselin ( INA ) - bh 95,000.00
7 Kloset jongkok porselin ( TOTO ) - bh 140,000.00
8 Kloset jongkok teraso - bh 31,000.00
9 Kran air Stainless Steel Q 1/2 " bh 32,000.00
10 Kran air Stainless Steel Q 3/4 " bh 38,000.00
11 Kran air Baik ( DUPONT ) Q 1/2 " bh 75,000.00
12 Kran air biasa Q 1/2 " bh 15,000.00
13 Kran Shower "Toto" Q 3/4 " bh 25,000.00
14 Septictank ( 10 Pemakai ) dan sumur unit 3,750,000.00
Peresapan ( dalam 3.00 )
15 Watermur Besi Q 3/4 " bh 7,000.00
16 wastafel Besar Warna Mmuda ( ITO ) - bh 195,000.00
17 Wastafel besar Warna Tua ( ITO ) - bh 266,000.00
18 WaterDrain & Aksesories - bh 25,000.00
19 Rol TBA ( seal tape ) - bh 1,200.00
19 Bak mandi fiberglass 0.5 m3 bh 440,000.00
20 bak cuci piring stainless steel - bh 200,000.00
21 BAK Cuci Teraso - bh 100,000.00
22 Tempat sabun Keramik " SOTENTO " - bh 25,000.00
23 Urinoir ( INA ) - set 687,500.00
24 Floor drain stainless steel - bh 25,000.00
25 Kurasan ( putih ) - bh 13,000.00
26 Bak Mandi Porselin 60 x 60 cm bh 1,800,000.00
27 Shipon Washer, kelas sedang plastik set 25,000.00
28 Tandon air fiberglass " Penyu " bh 800,000.00
29 Pompa Tangan " Dragon " bh 195,000.00
30 Hand Shower plastik ( ternasuk Slang ) bh 187,500.00
31 Wall Shower " TOTO " bh 406,000.00
-
1 2 3 4 -
-
IX BAHAN JENIS KACA -
1 Kaca polos t = 3 mm m2 40,000.00
2 Kaca polos t = 5 mm m2 55,000.00
3 Kaca rayban t = 5 mm m2 70,000.00
4 Kaca es / buram t = 5 mm m2 76,000.00
5 Krepyak kaca nako 15 x 70 + kerangka t = 70 cm daun 14,000.00
6 Kaca buram t = 3 mm m2 56,000.00
7 Kaca cermin t = 3 mm m2 79,000.00
-
X BAHAN BETON CETAKAN -
1 Beton Roster Klingker warna merah 10 x 20 bh 6,500.00
2 Buis beton ( p = 100 cm ) Dia. 15 cm bh 26,000.00
3 Buis beton ( p = 100 cm ) Dia. 20 cm bh 36,000.00
4 Buis beton ( p = 100 cm ) Dia. 30 cm bh 41,000.00
5 Buis beton ( p = 100 cm ) Dia. 40 cm bh 51,500.00
6 Buis beton ( p = 50 cm ) Dia. 50 cm bh 46,500.00
7 Buis beton ( p = 50 cm ) Dia. 60 cm bh 51,500.00
8 Buis beton ( p = 50 cm ) Dia. 80 cm bh 67,000.00
9 Buis beton ( p = 50 cm ) Dia. 100 cm bh 98,000.00
10 Buis beton U ( p = 100 cm ) Dia. 15 cm bh 31,000.00
11 Buis beton U ( p = 100 cm ) Dia. 20 cm bh 36,000.00
12 Buis beton U ( p = 100 cm ) Dia. 30 cm bh 43,000.00
13 Got talang R 15 ( segmen ) - bh 20,500.00
14 Got talang R 25 ( segmen ) - bh 33,500.00
-
XI BAHAN PIPA PVC -
1 Pipa PVC, type AW " Maspion " Dia. 1/2" - 400 bt 17,500.00
2 Pipa PVC, type AW " Maspion " Dia. 5/8" - 400 bt 19,000.00
3 Pipa PVC, type AW " Maspion " Dia. 3/4" - 400 bt 22,000.00
4 Pipa PVC, type AW " Maspion " Dia. 1" - 400 bt 28,000.00
5 Pipa PVC, type AW " Maspion " Dia. 2" - 400 bt 75,000.00
6 Pipa PVC, type AW " Maspion " Dia. 3" - 400 bt 135,000.00
7 Pipa PVC, type AW " Maspion " Dia. 4" - 400 bt 200,000.00
8 Pipa PVC, type AW " Maspion " Dia. 5" - 400 bt 310,000.00
9 Pipa PVC, type D Dia. 2" - 400 bt 37,000.00
10 Pipa PVC, type D Dia. 3" - 400 bt 80,000.00
11 Pipa PVC, type D Dia. 4" - 400 bt 114,000.00
12 Pipa PVC, type D Dia.5" -400 bt 171,000.00
13 Lem PVC "Wafin" - tube 5,000.00
14 Keni PVC type AW Dia 1/2 " bh 1,000.00
15 Keni PVC type AW Dia 3/4 " bh 1,500.00
16 Keni PVC type AW Dia 2 " bh 4,000.00
17 Keni PVC type AW Dia 3 " bh 5,500.00
18 Keni PVC type AW Dia 4 " bh 10,000.00
19 Keni PVC type AW Dia 5 " bh 15,000.00
20 Klem PVC bh 4,000.00
21 Talang PVC U 400 cm 45,000.00
22 Talang PVC U " Maspion " 400 cm Bh 70,000.00
23 Clam PVC U Bh 4,000.00
24 Shock talang PVC U Bh 4,500.00
25 Tutup talang PVC U Bh 4,500.00
26 Corong Talang PVC U Bh 11,000.00
-
XII BAHAN JENIS PAKU -
1 Paku asbes gelombang ( paku Pancing ) - kg 16,000.00
2 Paku kayu 2.5" - 3 " kg 9,000.00
3 Paku kayu 1.5" - 2 " kg 9,500.00
4 Paku kayu 1" kg 10,500.00
5 Paku kayu 4" kg 9,000.00
5 Paku seng payung (seng gelombang ) - kg 15,000.00
6 Paku sekrup 1" dos 7,000.00
7 Paku sumbat - dos 12,500.00
8 Paku triplek / eternit - kg 12,000.00
9 Paku beton 5 cm bh 300.00
10 Paku Kalsiboard kg 19,000.00
1 2 3 4
-
XIV BAHAN BBM -
1 Bensin lt 4,500.00
2 Solar lt 4,300.00
3 Minyak tanah lt 2,700.00
4 Oli mesin mesran lt 17,500.00
5 Minyak pelumas lt 26,000.00
6 Grease (gemuk pelumas) kg 17,000.00
7 Aspal Panas - kg 6,600.00
8 Sewa wheel loader jam 302,714.78
9 Sewa AMP jam 3,170,964.06
10 Sewa damp truck jam 275,626.90
11 Sewa asphalt finisher jam 231,470.98
12 Sewa asphalt sprayer jam 35,462.17
13 Sewa tandem roller jam 105,123.60
14 Sewa tire roller jam 303,191.92
15 Sewa genset jam 220,037.52
16 Sewa alat bantu jam 250.00
17 Sewa Mesin Gilas (Wales) hari 150,000.00
WAKTU
NO TENAGA KERJA SAT.
HARGA
I. PEKERJAAN PERSIAPAN
V. PEKERJAAN PLESTERAN
V.14.6.20 1 m2 Plesteran sponing : 1 PC : 2 Pp (Lebar 10 mm) Untuk Kusen Pintu dan Jendela
0.050 kg Semen pc Rp. 1,000.00 = Rp. 50.00
0.013 m3 Pasir pasang Rp. 51,000.00 = Rp. 663.00
Sub Total = Rp. 713.00
0.057 oh Pekerja Rp. 27,500.00 = Rp. 1,567.50
0.380 oh Tukang batu Rp. 35,000.00 = Rp. 13,300.00
0.038 oh Kepala tukang batu Rp. 37,500.00 = Rp. 1,425.00
0.003 oh Mandor Rp. 45,000.00 = Rp. 135.00
Sub Total = Rp. 16,427.50
Total = Rp. 17,140.50
Dibulatkan = Rp. 17,140.00
VI.3.6.3 1 m2 Daun Panil Pintu Klamp standart (Mutu kayu Klas II)
0.040 m3 Papan Kayu Kamper Rp. 7,250,000.00 = Rp. 290,000.00
0.05 Kg Paku 3" Rp. 9,000.00 = Rp. 450.00
Sub Total = Rp. 290,450.00
0.350 oh Pekerja Rp. 27,500.00 = Rp. 9,625.00
1.050 oh Tukang Kayu Rp. 37,500.00 = Rp. 39,375.00
0.105 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 4,200.00
0.018 oh Mandor Rp. 45,000.00 = Rp. 810.00
Sub Total = Rp. 54,010.00
Total = Rp. 344,460.00
Dibulatkan = Rp. 344,460.00
VI.4.6.5 1 m2 Daun Panil Pintu Panel (Mutu kayu Klas I atau II)
0.040 m3 Papan Kayu Kamper Rp. 7,250,000.00 = Rp. 290,000.00
0.50 kg Lem Kayu Rp. 26,000.00 = Rp. 13,000.00
Sub Total = Rp. 303,000.00
1.000 oh Pekerja Rp. 27,500.00 = Rp. 27,500.00
2.500 oh Tukang Kayu Rp. 37,500.00 = Rp. 93,750.00
0.250 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 10,000.00
0.050 oh Mandor Rp. 45,000.00 = Rp. 2,250.00
Sub Total = Rp. 133,500.00
Total = Rp. 436,500.00
Dibulatkan = Rp. 436,500.00
VI.5.6.6 1 m2 Daun Pintu & jendela kaca (Mutu kayu Klas I atau II)
0.064 m3 Papan Kayu Kamper Rp. 7,250,000.00 = Rp. 464,000.00
0.50 kg Lem Kayu Rp. 26,000.00 = Rp. 13,000.00
VI.9.6.12 1 m2 Daun Pintu Teakwood dan Formika, Rangka Mutu kayu Klas II
0.0250 m3 Papan Kayu Kamper Rp. 7,250,000.00 = Rp. 181,250.00
0.0300 Kg Paku Kayu Rp. 9,000.00 = Rp. 270.00
0.8000 kg Lem Kayu Rp. 26,000.00 = Rp. 20,800.00
1.0000 lbr Teakwood 90 x 120cm tebal 4m Rp. 60,000.00 = Rp. 60,000.00
0.5000 lbr Formika 4'x8' Rp. 145,000.00 = Rp. 72,500.00
Sub Total = Rp. 334,820.00
0.8000 oh Pekerja Rp. 27,500.00 = Rp. 22,000.00
2.5000 oh Tukang Kayu Rp. 37,500.00 = Rp. 93,750.00
0.2500 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 10,000.00
0.0400 oh Mandor Rp. 45,000.00 = Rp. 1,800.00
Sub Total = Rp. 127,550.00
Total = Rp. 462,370.00
VI.10.6.13 1 m3 Pasang Kostruksi Kuda-Kuda Konvensional (Mutu kayu Klas I, II dan III). Bentang 6 m
1.100 m3 Balok Kayu Balau Rp. 6,450,000.00 = Rp. 7,095,000.00
15.000 Kg Besi begel / baut (untuk Kuda-KuRp. 10,700.00 = Rp. 160,500.00
5.600 Kg paku kayu 3" Rp. 9,000.00 = Rp. 50,400.00
Sub Total = Rp. 7,305,900.00
4.000 oh Pekerja Rp. 27,500.00 = Rp. 110,000.00
12.000 oh Tukang Kayu Rp. 37,500.00 = Rp. 450,000.00
1.200 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 48,000.00
0.200 oh Mandor Rp. 45,000.00 = Rp. 9,000.00
Sub Total = Rp. 617,000.00
Total = Rp. 7,922,900.00
VI.10.6.13 1 m3 Pasang Kostruksi Kuda-Kuda Konvensional (Mutu kayu Klas I, II dan III). Bentang 6 m
1.100 m3 Balok Kayu Kruing Rp. 4,800,000.00 = Rp. 5,280,000.00
15.000 Kg Besi begel / baut (untuk Kuda-KuRp. 10,700.00 = Rp. 160,500.00
5.600 Kg paku kayu 3" Rp. 9,000.00 = Rp. 50,400.00
Sub Total = Rp. 5,490,900.00
4.000 oh Pekerja Rp. 27,500.00 = Rp. 110,000.00
12.000 oh Tukang Kayu Rp. 37,500.00 = Rp. 450,000.00
1.200 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 48,000.00
0.200 oh Mandor Rp. 45,000.00 = Rp. 9,000.00
Sub Total = Rp. 617,000.00
Total = Rp. 6,107,900.00
VI.10.6.13 1 m3 Pasang Kostruksi Kuda-Kuda Konvensional (Mutu kayu Klas I, II dan III). Bentang 6 m
1.100 m3 Balok Kayu Balau Rp. 1,300,000.00 = Rp. 1,430,000.00
15.000 Kg Besi begel / baut (untuk Kuda-KuRp. 10,700.00 = Rp. 160,500.00
5.600 Kg paku kayu 3" Rp. 9,000.00 = Rp. 50,400.00
Sub Total = Rp. 1,640,900.00
4.000 oh Pekerja Rp. 27,500.00 = Rp. 110,000.00
12.000 oh Tukang Kayu Rp. 37,500.00 = Rp. 450,000.00
1.200 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 48,000.00
0.200 oh Mandor Rp. 45,000.00 = Rp. 9,000.00
Sub Total = Rp. 617,000.00
Total = Rp. 2,257,900.00
VI.15.6.19 1 m2 Pasang Rangka Langit-langit 50 x 100 cm (Mutu kayu Klas II atau III )
0.015 m3 Balok Kayu Meranti 4/6 Rp. 3,700,000.00 = Rp. 56,980.00
0.200 Kg paku kayu 3" Rp. 9,000.00 = Rp. 1,800.00
Sub Total = Rp. 58,780.00
0.150 oh Pekerja Rp. 27,500.00 = Rp. 4,125.00
0.250 oh Tukang Kayu Rp. 37,500.00 = Rp. 9,375.00
0.025 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,000.00
0.075 oh Mandor Rp. 45,000.00 = Rp. 3,375.00
Sub Total = Rp. 17,875.00
Total = Rp. 76,655.00
Dibulatkan = Rp. 76,650.00
VI.16.6.21 1 m' Pasang Listplang ukuran (3x20)cm (Mutu kayu Klas I atau II )
0.0108 m3 Kayu Kamper Papan 3/20 Rp. 7,250,000.00 = Rp. 78,300.00
0.100 Kg paku kayu 3" Rp. 9,000.00 = Rp. 900.00
Sub Total = Rp. 79,200.00
0.100 oh Pekerja Rp. 27,500.00 = Rp. 2,750.00
0.200 oh Tukang Kayu Rp. 37,500.00 = Rp. 7,500.00
0.025 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,000.00
0.005 oh Mandor Rp. 45,000.00 = Rp. 225.00
Sub Total = Rp. 11,475.00
Total = Rp. 90,675.00
Dibulatkan = Rp. 90,670.00
VI.17.6.22 1 m' Pasang Listplang ukuran (3x30)cm (Mutu kayu Klas I atau II )
0.0110 m3 Kayu Kamper Papan 3/30 Rp. 7,250,000.00 = Rp. 79,750.00
0.050 Kg paku kayu 3" Rp. 9,000.00 = Rp. 450.00
Sub Total = Rp. 80,200.00
0.100 oh Pekerja Rp. 27,500.00 = Rp. 2,750.00
0.200 oh Tukang Kayu Rp. 37,500.00 = Rp. 7,500.00
0.020 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 800.00
0.005 oh Mandor Rp. 45,000.00 = Rp. 225.00
Sub Total = Rp. 11,275.00
Total = Rp. 91,475.00
Dibulatkan = Rp. 91,470.00
VI.17.6.22 1 m' Pasang Listplang ukuran (3x30)cm (Mutu kayu Klas I atau II )
0.0110 m3 Kayu Kruing Papan 3/30 Rp. 5,400,000.00 = Rp. 59,400.00
0.050 Kg paku kayu 3" Rp. 9,000.00 = Rp. 450.00
Sub Total = Rp. 59,850.00
0.100 oh Pekerja Rp. 27,500.00 = Rp. 2,750.00
0.200 oh Tukang Kayu Rp. 37,500.00 = Rp. 7,500.00
0.020 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 800.00
0.005 oh Mandor Rp. 45,000.00 = Rp. 225.00
Sub Total = Rp. 11,275.00
Total = Rp. 71,125.00
Dibulatkan = Rp. 71,120.00
VI.18.6.23 1 m2 Rangka Dinding Pemisah Ukuran 60 x 120 cm (Mutu kayu Klas II atau III )
0.0280 m3 Balok Kayu Kamper Rp. 6,500,000.00 = Rp. 182,000.00
0.150 Kg paku kayu 3" Rp. 9,000.00 = Rp. 1,350.00
Sub Total = Rp. 183,350.00
0.150 oh Pekerja Rp. 27,500.00 = Rp. 4,125.00
0.450 oh Tukang Kayu Rp. 37,500.00 = Rp. 16,875.00
0.045 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,800.00
0.008 oh Mandor Rp. 45,000.00 = Rp. 360.00
Sub Total = Rp. 23,160.00
Total = Rp. 206,510.00
VI.19.6.24 1 m2 Dinding pemisah Teakwood rangkap, Rangka (Mutu kayu Klas II)
0.0280 m3 Usuk Kayu Kamper Rp. 6,400,000.00 = Rp. 179,200.00
0.860 lbr Teakwood 4'x8' (4mm) Rp. 90,000.00 = Rp. 77,400.00
0.150 Kg paku kayu 3" Rp. 9,000.00 = Rp. 1,350.00
0.560 kg Lem Kayu Rp. 26,000.00 = Rp. 14,560.00
Sub Total = Rp. 272,510.00
0.150 oh Pekerja Rp. 27,500.00 = Rp. 4,125.00
0.450 oh Tukang Kayu Rp. 37,500.00 = Rp. 16,875.00
0.045 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,800.00
0.008 oh Mandor Rp. 45,000.00 = Rp. 360.00
Sub Total = Rp. 23,160.00
Total = Rp. 295,670.00
VII.1.6.3 1 m3 Beton Mutu f'c = 12.2 Mpa (K150). Slump (12 ± 2 cm). w/c = 0.72
299.000 kg Semen pc Rp. 1,000.00 = Rp. 299,000.00
0.753 M3 Koral beton 2/3 Rp. 135,000.00 = Rp. 101,695.50
0.571 M3 Pasir Beton Rp. 60,000.00 = Rp. 34,242.00
215.000 ltr Air Bersih Rp. = Rp. -
Sub Total = Rp. 434,937.50
1.650 oh Pekerja Rp. 27,500.00 = Rp. 45,375.00
0.275 oh Tukang Batu Rp. 35,000.00 = Rp. 9,625.00
0.028 oh Kep. Tukang Batu Rp. 37,500.00 = Rp. 1,050.00
0.083 oh Mandor Rp. 45,000.00 = Rp. 3,735.00
Sub Total = Rp. 59,785.00
Total = Rp. 494,722.50
Dibulatkan = Rp. 494,720.00
VII.2.6.4 1 m3 Beton Lantai Kerja Mutu f'c = 7.4 Mpa (K100). Slump (3 - 6 cm). w/c = 0.87
230.000 kg Semen pc Rp. 1,000.00 = Rp. 230,000.00
0.6379 M3 Pasir Beton Rp. 60,000.00 = Rp. 38,274.00
0.7607 M3 Koral beton 2/3 Rp. 135,000.00 = Rp. 102,694.50
200.000 ltr Air Bersih Rp. = Rp. -
Sub Total = Rp. 370,968.50
1.200 oh Pekerja Rp. 27,500.00 = Rp. 33,000.00
0.200 oh Tukang Batu Rp. 35,000.00 = Rp. 7,000.00
0.020 oh Kep. Tukang Batu Rp. 37,500.00 = Rp. 750.00
0.006 oh Mandor Rp. 45,000.00 = Rp. 270.00
Sub Total = Rp. 41,020.00
Total = Rp. 411,988.50
Dibulatkan = Rp. 411,980.00
VII.3.6.5 1 m3 Beton Mutu f'c = 14.5 Mpa (K175). Slump (12 ± 2 cm). w/c = 0.66
326.000 kg Semen pc Rp. 1,000.00 = Rp. 326,000.00
0.543 M3 Pasir Beton Rp. 60,000.00 = Rp. 32,574.00
0.762 M3 Koral beton 2/3 Rp. 135,000.00 = Rp. 102,897.00
215.000 ltr Air Bersih Rp. = Rp. -
Sub Total = Rp. 461,471.00
1.650 oh Pekerja Rp. 27,500.00 = Rp. 45,375.00
0.250 oh Tukang Batu Rp. 35,000.00 = Rp. 8,750.00
0.025 oh Kep. Tukang Batu Rp. 37,500.00 = Rp. 937.50
0.080 oh Mandor Rp. 45,000.00 = Rp. 3,600.00
Sub Total = Rp. 58,662.50
Total = Rp. 520,133.50
Dibulatkan = Rp. 520,130.00
VII.4.6.7 1 m3 Beton Mutu f'c = 19.3 Mpa (K225). Slump (12 ± 2 cm). w/c = 0.58
371.000 kg Semen pc Rp. 1,000.00 = Rp. 371,000.00
0.4986 M3 Pasir Beton Rp. 60,000.00 = Rp. 29,916.00
0.7756 M3 Koral beton 2/3 Rp. 135,000.00 = Rp. 104,706.00
215.000 ltr Air Bersih Rp. = Rp. -
Sub Total = Rp. 505,622.00
1.650 oh Pekerja Rp. 27,500.00 = Rp. 45,375.00
0.250 oh Tukang Batu Rp. 35,000.00 = Rp. 8,750.00
0.025 oh Kep. Tukang Batu Rp. 37,500.00 = Rp. 937.50
0.080 oh Mandor Rp. 45,000.00 = Rp. 3,600.00
Sub Total = Rp. 58,662.50
Total = Rp. 564,284.50
Dibulatkan = Rp. 564,280.00
VII.5.6.9 1 m3 Beton Mutu f'c = 24 Mpa (K275). Slump (12 ± 2 cm). w/c = 0.53
406.000 kg Semen pc Rp. 1,000.00 = Rp. 406,000.00
0.4886 M3 Pasir Beton Rp. 60,000.00 = Rp. 29,316.00
0.7600 M3 Koral beton 2/3 Rp. 135,000.00 = Rp. 102,600.00
215.000 ltr Air Bersih Rp. = Rp. -
Sub Total = Rp. 537,916.00
1.650 oh Pekerja Rp. 27,500.00 = Rp. 45,375.00
0.250 oh Tukang Batu Rp. 35,000.00 = Rp. 8,750.00
0.025 oh Kep. Tukang Batu Rp. 37,500.00 = Rp. 937.50
0.080 oh Mandor Rp. 45,000.00 = Rp. 3,600.00
Sub Total = Rp. 58,662.50
Total = Rp. 596,578.50
Dibulatkan = Rp. 596,570.00
VII.6.6.10 1 m3 Beton Mutu f'c = 26.4 Mpa (K300). Slump (12 ± 2 cm). w/c = 0.52
413.000 kg Semen pc Rp. 1,000.00 = Rp. 413,000.00
0.4864 M3 Pasir Beton Rp. 60,000.00 = Rp. 29,184.00
0.7563 M3 Koral beton 2/3 Rp. 135,000.00 = Rp. 102,100.50
215.000 ltr Air Bersih Rp. = Rp. -
Sub Total = Rp. 544,284.50
1.650 oh Pekerja Rp. 27,500.00 = Rp. 45,375.00
0.250 oh Tukang Batu Rp. 35,000.00 = Rp. 8,750.00
0.025 oh Kep. Tukang Batu Rp. 37,500.00 = Rp. 937.50
0.080 oh Mandor Rp. 45,000.00 = Rp. 3,600.00
Sub Total = Rp. 58,662.50
Total = Rp. 602,947.00
Dibulatkan = Rp. 602,940.00
VII.7.6.12 1 m3 Beton Mutu f'c = 26.4 Mpa (K300). Slump (12 ± 2 cm). w/c = 0.52
448.000 kg Semen pc Rp. 1,000.00 = Rp. 448,000.00
0.4764 M3 Pasir Beton Rp. 60,000.00 = Rp. 28,584.00
0.7407 M3 Koral beton 2/3 Rp. 135,000.00 = Rp. 99,994.50
215.000 ltr Air Bersih Rp. = Rp. -
Sub Total = Rp. 576,578.50
2.100 oh Pekerja Rp. 27,500.00 = Rp. 57,750.00
0.350 oh Tukang Batu Rp. 35,000.00 = Rp. 12,250.00
0.035 oh Kep. Tukang Batu Rp. 37,500.00 = Rp. 1,312.50
0.105 oh Mandor Rp. 45,000.00 = Rp. 4,725.00
Sub Total = Rp. 76,037.50
Total = Rp. 652,616.00
Dibulatkan = Rp. 652,610.00
VII.10.6.20. 1 m2 Pasang Bekisting untuk pondasi (Papan Kayu Mutu Kayu Klas III)
0.040 m3 Papan Begisting 2/20 Kayu Meran
Rp. 4,600,000.00 = Rp. 184,000.00
0.1000 m3 Minyak Begesting Rp. 4,300.00 = Rp. 430.00
0.300 kg Paku 3" Rp. 9,000.00 = Rp. 2,700.00
Sub Total = Rp. 187,130.00
0.520 oh Pekerja Rp. 27,500.00 = Rp. 14,300.00
0.260 oh Tukang Kayu Rp. 37,500.00 = Rp. 9,750.00
0.026 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,040.00
0.026 oh Mandor Rp. 45,000.00 = Rp. 1,170.00
Sub Total = Rp. 26,260.00
Total = Rp. 213,390.00
Dibulatkan = Rp. 213,390.00
1 m2 Bekisting dihitung 2x pakai = Rp. 106,695.00
VII.11.6.21. 1 m2 Pasang Bekisting untuk Sloof (Papan Kayu Mutu Kayu Klas III)
0.045 m3 Papan Begisting 2/20 Kayu Meran
Rp. 4,600,000.00 = Rp. 207,000.00
0.1000 m3 Minyak Begesting Rp. 4,300.00 = Rp. 430.00
0.300 kg Paku 3" Rp. 9,000.00 = Rp. 2,700.00
Sub Total = Rp. 210,130.00
0.520 oh Pekerja Rp. 27,500.00 = Rp. 14,300.00
0.260 oh Tukang Kayu Rp. 37,500.00 = Rp. 9,750.00
0.026 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,040.00
0.026 oh Mandor Rp. 45,000.00 = Rp. 1,170.00
Sub Total = Rp. 26,260.00
Total = Rp. 236,390.00
Dibulatkan = Rp. 236,390.00
1 m2 Bekisting dihitung 2x pakai = Rp. 118,195.00
VII.12.6.22 1 m2 Pasang Bekisting untuk Kolom Struktur (Papan Kayu Mutu Kayu Klas III)
0.040 m3 Papan Begisting 2/20 Kayu MeranRp. 4,600,000.00 = Rp. 184,000.00
0.400 kg Paku 3" Rp. 9,000.00 = Rp. 3,600.00
0.2000 m3 Minyak Begesting Rp. 4,300.00 = Rp. 860.00
0.015 m3 Balok Begisting 6/12 Kayu MeranRp. 4,000,000.00 = Rp. 60,000.00
0.350 lbr Tripleks 9 mm Rp. 130,000.00 = Rp. 45,500.00
2.000 btg Bambu apus Dia 10 - 6 m Rp. 9,000.00 = Rp. 18,000.00
Sub Total = Rp. 311,960.00
0.660 oh Pekerja Rp. 27,500.00 = Rp. 18,150.00
0.330 oh Tukang Kayu Rp. 37,500.00 = Rp. 12,375.00
0.033 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,320.00
0.033 oh Mandor Rp. 45,000.00 = Rp. 1,485.00
Sub Total = Rp. 33,330.00
Total = Rp. 345,290.00
Dibulatkan = Rp. 345,290.00
1 m2 Bekisting dihitung 2x pakai = Rp. 172,645.00
VII.13.6.23 1 m2 Pasang Bekisting untuk Balok Struktur (Papan Kayu Mutu Kayu Klas III)
0.040 m3 Papan Begisting 2/20 Kayu MeranRp. 4,600,000.00 = Rp. 184,000.00
0.400 kg Paku 3" Rp. 9,000.00 = Rp. 3,600.00
0.2000 m3 Minyak Begesting Rp. 4,300.00 = Rp. 860.00
0.018 m3 Balok Begisting 6/12 Kayu MeranRp. 4,000,000.00 = Rp. 72,000.00
0.350 lbr Tripleks 9 mm Rp. 130,000.00 = Rp. 45,500.00
2.000 btg Bambu apus Dia 10 - 6 m Rp. 9,000.00 = Rp. 18,000.00
Sub Total = Rp. 323,960.00
0.660 oh Pekerja Rp. 27,500.00 = Rp. 18,150.00
0.330 oh Tukang Kayu Rp. 37,500.00 = Rp. 12,375.00
0.033 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,320.00
0.033 oh Mandor Rp. 45,000.00 = Rp. 1,485.00
Sub Total = Rp. 33,330.00
Total = Rp. 357,290.00
Dibulatkan = Rp. 357,290.00
1 m2 Bekisting dihitung 2x pakai = Rp. 178,645.00
VII.14.6.24 1 m2 Pasang Bekisting untuk Lantai (Papan Kayu Mutu Kayu Klas III)
0.040 m3 Papan Begisting 2/20 Kayu MeranRp. 4,600,000.00 = Rp. 184,000.00
0.400 kg Paku 3" Rp. 9,000.00 = Rp. 3,600.00
0.2000 m3 Minyak Begesting Rp. 4,300.00 = Rp. 860.00
0.015 m3 Balok Begisting 6/12 Kayu MeranRp. 4,000,000.00 = Rp. 60,000.00
0.350 lbr Tripleks 9 mm Rp. 130,000.00 = Rp. 45,500.00
6.000 btg Bambu apus Dia 10 - 6 m Rp. 9,000.00 = Rp. 54,000.00
Sub Total = Rp. 347,960.00
0.660 oh Pekerja Rp. 27,500.00 = Rp. 18,150.00
0.330 oh Tukang Kayu Rp. 37,500.00 = Rp. 12,375.00
0.033 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,320.00
0.033 oh Mandor Rp. 45,000.00 = Rp. 1,485.00
Sub Total = Rp. 33,330.00
Total = Rp. 381,290.00
Dibulatkan = Rp. 381,290.00
1 m2 Bekisting dihitung 2x pakai = Rp. 190,645.00
VII.15.6.25 1 m2 Pasang Bekisting untuk Dinding (Papan Kayu Mutu Kayu Klas III)
0.030 m3 Papan Begisting 2/20 Kayu MeranRp. 4,600,000.00 = Rp. 138,000.00
0.400 kg Paku 3" Rp. 9,000.00 = Rp. 3,600.00
0.2000 m3 Minyak Begesting Rp. 4,300.00 = Rp. 860.00
0.020 m3 Balok Begisting 6/12 Kayu MeranRp. 4,000,000.00 = Rp. 80,000.00
0.350 lbr Tripleks 9 mm Rp. 130,000.00 = Rp. 45,500.00
3.000 btg Bambu apus Dia 10 - 6 m Rp. 9,000.00 = Rp. 27,000.00
4.000 btg Bambu apus Dia 10 - 6 m Rp. 9,000.00 = Rp. 36,000.00
Sub Total = Rp. 330,960.00
0.660 oh Pekerja Rp. 27,500.00 = Rp. 18,150.00
0.330 oh Tukang Kayu Rp. 37,500.00 = Rp. 12,375.00
0.033 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,320.00
0.033 oh Mandor Rp. 45,000.00 = Rp. 1,485.00
Sub Total = Rp. 33,330.00
Total = Rp. 364,290.00
Dibulatkan = Rp. 364,290.00
1 m2 Bekisting dihitung 2x pakai = Rp. 182,145.00
VII.16.6.26 1 m2 Pasang Bekisting untuk Tangga (Papan Kayu Mutu Kayu Klas III)
0.030 m3 Papan Begisting 2/20 Kayu MeranRp. 4,600,000.00 = Rp. 138,000.00
0.400 kg Paku 3" Rp. 9,000.00 = Rp. 3,600.00
0.1500 m3 Minyak Begesting Rp. 4,300.00 = Rp. 645.00
0.015 m3 Balok Begisting 6/12 Kayu MeranRp. 4,000,000.00 = Rp. 60,000.00
0.350 lbr Tripleks 9 mm Rp. 130,000.00 = Rp. 45,500.00
2.000 btg Bambu apus Dia 10 - 6 m Rp. 9,000.00 = Rp. 18,000.00
Sub Total = Rp. 265,745.00
0.660 oh Pekerja Rp. 27,500.00 = Rp. 18,150.00
0.330 oh Tukang Kayu Rp. 37,500.00 = Rp. 12,375.00
0.033 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,320.00
0.033 oh Mandor Rp. 45,000.00 = Rp. 1,485.00
Sub Total = Rp. 33,330.00
Total = Rp. 299,075.00
Dibulatkan = Rp. 299,070.00
1 m2 Bekisting dihitung 2x pakai = Rp. 149,535.00
VII.17.6.27 1 m2 Pasang Bekisting untuk Duiker/Jembatan (Papan Kayu Mutu Kayu Klas III)
0.026 m3 Papan Begisting 2/20 Kayu Meran
Rp. 4,600,000.00 = Rp. 121,440.00
0.600 kg Paku 3" Rp. 9,000.00 = Rp. 5,400.00
0.500 btg Bambu apus Dia 10 - 6 m Rp. 9,000.00 = Rp. 4,500.00
Sub Total = Rp. 131,340.00
0.150 oh Pekerja Rp. 27,500.00 = Rp. 4,125.00
0.050 oh Tukang Kayu Rp. 37,500.00 = Rp. 1,875.00
0.005 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 200.00
0.008 oh Mandor Rp. 45,000.00 = Rp. 360.00
Sub Total = Rp. 6,560.00
Total = Rp. 137,900.00
Dibulatkan = Rp. 137,900.00
1 m2 Bekisting dihitung 2x pakai = Rp. 68,950.00
IX.6.6.20 1 m2 Pasang langit - langit Eternit 1.00 x 1.00 (kerangka kayu kamper)
0.012 m3 Usuk Kayu Kamper 5/7 Rp. 6,400,000.00 = Rp. 76,800.00
1.100 lbr Eternit lokal Rp. 7,000.00 = Rp. 7,700.00
0.060 Kg Paku usuk Rp. 9,500.00 = Rp. 570.00
Sub Total = Rp. 85,070.00
0.180 oh Pekerja Rp. 27,500.00 = Rp. 4,950.00
0.320 oh Tukang Kayu Rp. 37,500.00 = Rp. 12,000.00
0.032 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,280.00
0.0090 oh Mandor Rp. 45,000.00 = Rp. 405.00
Sub Total = Rp. 18,635.00
Total = Rp. 103,705.00
Dibulatkan = Rp. 103,700.00
IX.6.6.20 1 m2 Pasang langit - langit Eternit 1.00 x 1.00 (kerangka kayu Meranti)
0.012 m3 Usuk Kayu Meranti 5/7 Rp. 3,700,000.00 = Rp. 44,400.00
1.100 lbr Eternit lokal Rp. 7,000.00 = Rp. 7,700.00
0.060 Kg Paku 3" Rp. 9,000.00 = Rp. 540.00
0.020 Kg Paku Eternit Rp. 12,000.00 = Rp. 240.00
Sub Total = Rp. 52,880.00
0.180 oh Pekerja Rp. 27,500.00 = Rp. 4,950.00
0.320 oh Tukang Kayu Rp. 37,500.00 = Rp. 12,000.00
0.032 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,280.00
0.0090 oh Mandor Rp. 45,000.00 = Rp. 405.00
Sub Total = Rp. 18,635.00
Total = Rp. 71,515.00
Dibulatkan = Rp. 71,510.00
IX.6.6.20 1 m2 Pasang langit - langit Eternit 1.00 x 1.00 Kayu Lama
m3 Rp. 3,700,000.00 = Rp. -
1.100 lbr Eternit lokal Rp. 7,000.00 = Rp. 7,700.00
0.060 Kg Paku 3" Rp. 9,000.00 = Rp. 540.00
0.020 Kg Paku Eternit Rp. 12,000.00 = Rp. 240.00
Sub Total = Rp. 8,480.00
0.180 oh Pekerja Rp. 27,500.00 = Rp. 4,950.00
0.320 oh Tukang Kayu Rp. 37,500.00 = Rp. 12,000.00
0.032 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,280.00
0.0090 oh Mandor Rp. 45,000.00 = Rp. 405.00
Sub Total = Rp. 18,635.00
Total = Rp. 27,115.00
Dibulatkan = Rp. 27,110.00
IX.6.6.20 1 m2 Pasang langit - langit Harplek 1.00 x 1.00 (kerangka kayu Meranti)
0.012 m3 Usuk Kayu Meranti 5/7 Rp. 3,700,000.00 = Rp. 44,400.00
1.100 lbr Harplek 4m ( 50 x 200 ) Rp. 12,500.00 = Rp. 13,750.00
0.060 Kg Paku 3" Rp. 9,000.00 = Rp. 540.00
0.020 Kg Paku Eternit Rp. 12,000.00 = Rp. 240.00
Sub Total = Rp. 58,930.00
0.180 oh Pekerja Rp. 27,500.00 = Rp. 4,950.00
0.320 oh Tukang Kayu Rp. 37,500.00 = Rp. 12,000.00
0.032 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,280.00
0.0090 oh Mandor Rp. 45,000.00 = Rp. 405.00
Sub Total = Rp. 18,635.00
Total = Rp. 77,565.00
Dibulatkan = Rp. 77,560.00
IX.7.6.21 1 m2 Pasang langit - langit Triplek Lapis Aluminium = 3 mm (kerangka kayu Meranti)
0.023 m3 Usuk Kayu Merantir 5/7 Rp. 3,700,000.00 = Rp. 85,100.00
0.390 lbr Tiplek Lapis Aluminium Rp. #REF! = Rp. #REF!
0.060 Kg Paku usuk Rp. 9,000.00 = Rp. 540.00
0.030 Kg Paku Triplek Rp. 12,000.00 = Rp. 360.00
Sub Total = Rp. #REF!
0.270 oh Pekerja Rp. 27,500.00 = Rp. 7,425.00
0.400 oh Tukang Kayu Rp. 37,500.00 = Rp. 15,000.00
0.040 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 1,600.00
0.0135 oh Mandor Rp. 45,000.00 = Rp. 607.50
Sub Total = Rp. 24,632.50
Total = Rp. #REF!
Dibulatkan = Rp. #REF!
IX.8.6.24 1 m' Langit-langit gypsum board tebal 9 mm, Kerangka Kayu Meranti
0.012 m3 Kayu Meranti Rp. 3,700,000.00 = Rp. 44,400.00
0.364 lbr Gypsum Board (120x240)cm, t= Rp. 56,000.00 = Rp. 20,384.00
0.060 kg Paku usuk Rp. 9,500.00 = Rp. 570.00
0.110 kg Paku gypsum Rp. 19,000.00 = Rp. 2,090.00
Sub Total = Rp. 67,444.00
0.100 oh Pekerja Rp. 27,500.00 = Rp. 2,750.00
0.050 oh Tukang Kayu Rp. 37,500.00 = Rp. 1,875.00
0.005 oh Kep. Tukang Kayu Rp. 40,000.00 = Rp. 200.00
0.005 oh Mandor Rp. 45,000.00 = Rp. 225.00
Sub Total = Rp. 5,050.00
Total = Rp. 72,494.00
Dibulatkan = Rp. 72,490.00
X. PEKERJAAN SANITASI
X.6.6.8 1 Bh Pasang Bak Mandi Pasangan Batu Bata Vol. 0.3 m3 (Uk. 50 x 60 100 cm)
200.000 m3 Bata merah Kelas I Rp. 290.00 = Rp. 58,000.00
120.000 kg Semen PC Rp. 1,000.00 = Rp. 120,000.00
3.800 m2 Keramik Asia 20 x 25 cm Rp. 46,000.00 = Rp. 174,800.00
0.300 m3 Pasir Pasang Rp. 51,000.00 = Rp. 15,300.00
6.000 kg PC Super Nat Rp. 9,000.00 = Rp. 54,000.00
Sub Total = Rp. 422,100.00
6.000 oh Pekerja Rp. 27,500.00 = Rp. 165,000.00
3.000 oh Tukang Batu Rp. 35,000.00 = Rp. 105,000.00
0.300 oh Tukang Batu Rp. 37,500.00 = Rp. 11,250.00
0.300 oh Mandor Rp. 45,000.00 = Rp. 13,500.00
Sub Total = Rp. 294,750.00
Total = Rp. 716,850.00
( Harga pipa disesuaikan diameter yang dibutuhkan ) Dibulatkan = Rp. 716,850.00
X.8.6.17 1 bh memasang bak kontrol pasangan batu bata uk. (45 x 45) cm, sedalam 50 cm
250.000 bh Bata merah Kelas I Rp. 290.00 = Rp. 72,500.00
77.000 Kg Semen PC Rp. 1,000.00 = Rp. 77,000.00
0.130 m3 Pasir Pasang Rp. 51,000.00 = Rp. 6,630.00
0.020 m3 batu kerikil 2/3 Rp. 135,000.00 = Rp. 2,700.00
0.090 m3 pasir beton Rp. 60,000.00 = Rp. 5,400.00
2.600 Kg besi beton Rp. 8,000.00 = Rp. 20,800.00
0.040 Kg kawat beton Rp. 10,000.00 = Rp. 400.00
Sub Total = Rp. 185,430.00
1.420 oh Pekerja Rp. 27,500.00 = Rp. 39,050.00
0.473 oh Tukang Batu Rp. 35,000.00 = Rp. 16,555.00
0.047 oh Kep. Tukang Batu Rp. 37,500.00 = Rp. 1,762.50
0.0710 oh Mandor Rp. 45,000.00 = Rp. 3,195.00
Sub Total = Rp. 60,562.50
Total = Rp. 245,992.50
Dibulatkan = Rp. 245,990.00
X.9.6.18 1 bh memasang bak kontrol pasangan batu bata uk. (60 x 60) cm, sedalam 65 cm
371.000 bh Bata merah Kelas I Rp. 290.00 = Rp. 107,590.00
114.000 kg Semen PC Rp. 1,000.00 = Rp. 114,000.00
0.184 m3 Pasir Pasang Rp. 51,000.00 = Rp. 9,384.00
0.033 m3 batu kerikil 2/3 Rp. 135,000.00 = Rp. 4,455.00
4.850 Kg besi beton Rp. 8,000.00 = Rp. 38,800.00
0.073 Kg kawat beton Rp. 10,000.00 = Rp. 730.00
0.120 m3 pasir beton Rp. 60,000.00 = Rp. 7,200.00
Sub Total = Rp. 282,159.00
2.160 oh Pekerja Rp. 27,500.00 = Rp. 59,400.00
0.100 oh Tukang Gali Rp. 27,500.00 = Rp. 2,750.00
0.720 oh Tukang Batu Rp. 35,000.00 = Rp. 25,200.00
0.072 oh Kep. Tukang Batu Rp. 37,500.00 = Rp. 2,700.00
0.1080 oh Mandor Rp. 45,000.00 = Rp. 4,860.00
Sub Total = Rp. 94,910.00
Total = Rp. 377,069.00
Dibulatkan = Rp. 377,060.00
X.9.6.19 1 m' Pasang pipa Galvanis (0.5" - 1")
1.20 m' Pipa Galvanis Med. A (Dia. 1/2", Rp. 28,500.00 = Rp. 34,200.00
35.0000 % Perlengkapan Rp. 28,500.00 = Rp. 9,975.00
Sub Total = Rp. 44,175.00
0.054 oh Pekerja Rp. 27,500.00 = Rp. 1,485.00
0.090 org Tukang Batu Rp. 35,000.00 = Rp. 3,150.00
0.009 org Kep. Tukang Batu Rp. 37,500.00 = Rp. 337.50
0.0270 oh Mandor Rp. 45,000.00 = Rp. 1,215.00
Sub Total = Rp. 6,187.50
Total = Rp. 50,362.50
( Harga pipa disesuaikan diameter yang dibutuhkan ) Dibulatkan = Rp. 50,360.00
X.10.6.22 1 m' Pasang pipa Galvanis (1.5" - 3")
1.20 m' Pipa Galvanis Med. A (Dia. 1.5", Rp. 85,750.00 = Rp. 102,900.00
35.0000 % Perlengkapan Rp. 85,750.00 = Rp. 30,012.50
Sub Total = Rp. 132,912.50
0.108 oh Pekerja Rp. 27,500.00 = Rp. 2,970.00
0.180 org Tukang Batu Rp. 35,000.00 = Rp. 6,300.00
0.018 org Kep. Tukang Batu Rp. 37,500.00 = Rp. 675.00
0.0054 oh Mandor Rp. 45,000.00 = Rp. 243.00
Sub Total = Rp. 10,188.00
Total = Rp. 143,100.50
( Harga pipa disesuaikan diameter yang dibutuhkan ) Dibulatkan = Rp. 143,100.00
6. L.3 1 m2 Bongkar dinding tembok Tebal lebih 2 bata & bongkarannya dapat Dipakai dibersihkan
4.00 oh Pekerja Rp. 27,500.00 = Rp. 110,000.00
0.400 bh Mandor Rp. 45,000.00 = Rp. 18,000.00
Total = Rp. 128,000.00
7. L.4 1 m2 Bongkar dinding tembok ysng tipis terhitung dengan membuat bersih batu merah
2.00 oh Pekerja Rp. 27,500.00 = Rp. 55,000.00
0.100 bh Mandor Rp. 45,000.00 = Rp. 4,500.00
Total = Rp. 59,500.00
14. L.12 1 m3 Bongkar kayu balok loteng, kuda-kuda, jlurung jembatan untuk dipakai lagi
4.00 oh Pekerja Rp. 27,500.00 = Rp. 110,000.00
6.00 oh Tukang kayu Rp. 37,500.00 = Rp. 225,000.00
0.60 oh Kep. Tukang kayu Rp. 40,000.00 = Rp. 24,000.00
0.20 oh Mandor Rp. 45,000.00 = Rp. 9,000.00
Total = Rp. 368,000.00
Jika bongkaran tidak dipakai lagi
4.00 oh Pekerja Rp. 27,500.00 = Rp. 110,000.00
0.20 oh Mandor Rp. 45,000.00 = Rp. 9,000.00
Total = Rp. 119,000.00
15.L.13 Bongkaran kayu yg Tinggi tembonya Lebih 3.5 M dikalikan 2/3 dari analisa L.12 = Rp. 245,333.33
HASIL OBSERVASI
OL. 1 1 m3 Bongkaran Pasangan Pondasi Batu Kali
6.67 oh Pekerja Rp. 27,500.00 = Rp. 183,342.50
0.125 oh Mandor Rp. 45,000.00 = Rp. 5,625.00
Sub Total = Rp. 188,967.50
Toatal = Rp. 188,967.50
Dibulatkan = Rp. 188,960.00
OL. 2 1 m3 Pembuangan Tanah Sejauh 150m ( atau lebih )
0.5160 oh Pekerja Rp. 27,500.00 = Rp. 14,190.00
0.0500 oh Mandor Rp. 45,000.00 = Rp. 2,250.00
Toatal = Rp. 16,440.00
Dibulatkan = Rp. 16,440.00
PEMBANGUNAN PAGAR
A PEKERJAAN PEMBERSIHAN
1 Pembersihan Lokasi M2 SNI I.5.6.8 20.50 5,000.00 102,500.00
102,500.00
B PEKERJAAN TANAH
1 Galian Tanah M3 SNI II.1.6.1 18.54 21,750.00 403,158.00
2 Urugan Tanah Kembali M3 SNI II.7.6.9.a 5.56 7,240.00 40,260.19
3 Urugan Pasir Bawah Pondasi M3 SNI II.11.6.11 2.32 61,500.00 142,495.50
585,913.69
C PEKERJAAN PASANGAN
1 Pasang Aanstampeng Batu Kali M3 SNI III.9.6.9 2.32 162,920.00 377,485.64
2 Pasang Pondasi Batu Kali 1 : 4 M3 SNI III.2.6.2 8.94 362,990.00 3,244,041.63
3 Pasang Batu Bata Merah 1 : 4 M2 SNI IV.2.6.3 74.83 97,490.00 7,295,176.70
4 Plesteran 1 : 4 M2 SNI V.2.6.4 149.66 19,220.00 2,876,465.20
5 Pasang Tegel Granito M2 SNI XIII.4.6.10 4.68 221,220.00 1,035,309.60
6 Pasang Roster Batu Alam Bh 26.00 70,000.00 1,820,000.00
7 Pembuatan Tulisan Ls 1.00 450,000.00 450,000.00
8 Pembuatan Pagar Besi + Pengecatan M2 22.80 661,500.00 15,082,200.00
32,180,678.77
D PEKERJAAN BETON
1 Cor Beton Poer 60 x 60 x30 M3 SNI VII.4.6.7 0.22 520,130.00 112,348.08
- Besi Kg SNI VII.9.6.17.a 23.76 9,030.00 214,552.80
2 Cor Beton Strous M3 SNI VII.4.6.7 0.34 520,130.00 176,386.49
- Besi Kg SNI VII.9.6.17.a 37.30 9,030.00 336,847.90
3 Cor Beton Sloof 15/20 M3 SNI VII.4.6.7 0.99 520,130.00 516,489.09
- Besi Kg SNI VII.9.6.17.a 158.88 9,030.00 1,434,686.40
- Begesting M2 OL.12 13.24 43,655.00 577,992.20
4 Cor Beton Kolom 20/20 M3 SNI VII.4.6.7 0.36 520,130.00 187,246.80
- Besi Kg SNI VII.9.6.17.a 57.60 9,030.00 520,128.00
- Begesting M2 OL.12 3.60 43,655.00 157,158.00
5 Cor Beton Kolom 15/15 M3 SNI VII.4.6.7 0.38 520,130.00 196,609.14
- Besi Kg SNI VII.9.6.17.a 60.48 9,030.00 546,134.40
- Begesting M2 OL.12 0.38 43,655.00 16,501.59
6 Cor Beton Ring 20/20 M3 SNI VII.4.6.7 0.14 520,130.00 72,818.20
- Besi Kg SNI VII.9.6.17.a 22.40 9,030.00 202,272.00
- Begesting M2 OL.12 1.40 43,655.00 61,117.00
7 Cor Beton plat M3 SNI VII.4.6.7 0.12 520,130.00 63,715.93
- Besi Kg SNI VII.9.6.17.a 13.48 9,030.00 121,679.25
- Begesting M2 OL.12 1.75 43,655.00 76,396.25
8 Cor Beton Ring 15/15 M3 SNI VII.4.6.7 0.51 520,130.00 266,241.54
- Besi Kg SNI VII.9.6.17.a 81.90 9,030.00 739,557.00
- Begesting M2 OL.12 9.10 43,655.00 397,260.50
6,994,138.55
E PEKERJAAN CAT
1 Mengecat Dinding Baru M2 SNI XIV.7.6.14 149.66 8,380.00 1,254,150.80
1,254,150.80
PEMBANGUNAN PAGAR
A PEKERJAAN PEMBERSIHAN Rp. 102,500.00
D ###
PEKERJAAN BETON Rp. 6,994,138.55
E ###
PEKERJAAN CAT Rp. 1,254,150.80
Plat Injak
Ø 12 - 12 142.93
Ø 12 - 100 360.43
503.36