URAIAN PEKERJAAN Volume Satuan Harga satuan Sub Total Pajak (Rp.) Total (Rp.)
(Rp.)
A. PEKERJAAN PENDAHULUAN
I. PEKERJAAN PERSIAPAN
1. Pengukuran & Pemasangan Bowplank 128.90 m 66,578.60 8,581,982 858,198.15 9,440,179.69
2. Pek. Pemasangan Pagar Pengaman Seng Gelombang (Alun-Alun) 79.20 m 160,885.45 12,742,128 1,274,212.76 14,016,340.40
3. Pek. Pemasangan Tanda Pengenal Proyek 1.00 Ls 300,000.00 300,000 30,000.00 330,000.00
4. Pek. Direksi Keet/Kantor Sentara 8.79 m2 1,328,089.40 11,673,906 1,167,390.58 12,841,296.41
5. Pek. Gudang Alat 12.00 m2 987,981.50 11,855,778 1,185,577.80 13,041,355.80
6. Administrasi, Dokumentasi, Dan Asbuild Drawing 1.00 Ls 4,000,000.00 4,000,000 400,000.00 4,400,000.00
II. PEKERJAAN RK3K KONSTRUKSI
1. Alat Pelindung Kerja terdiri atas
- Topi Pelindung (Safety Helmet) 25.00 Bh 50,000.00 1,250,000 125,000.00 1,375,000.00
- Pelindung Mata (Goggles, Spectacles) 25.00 Psg 20,000.00 500,000 50,000.00 550,000.00
- Pelindung Pernafasan Dan Mulut (Masker) 25.00 Bh 5,000.00 125,000 12,500.00 137,500.00
- Sarung Tangan (Safety Gloves) 25.00 Psg 10,000.00 250,000 25,000.00 275,000.00
- Sepatu Keselamatan (Rubber Safety Shoes and toe cap) 25.00 Psg 150,000.00 3,750,000 375,000.00 4,125,000.00
- Penunjang Seluruh Tubuh (Full Body Harness) 10.00 Bh 500,000.00 5,000,000 500,000.00 5,500,000.00
- Rompi Keselamatan (Safety Vest) 25.00 Bh 25,000.00 625,000 62,500.00 687,500.00
2. P3K
- Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) 1.00 Ls 1,000,000.00 1,000,000 100,000.00 1,100,000.00
B. PEKERJAAN STRUKTUR
I. PEKERJAAN PONDASI
1. Pondasi Poer Plat
- Pek. Galian Tanah Pondasi 75.17 m3 94,600.00 7,111,082 711,108.20 7,822,190.20
- Pek. Urugan Tanah Kembali 18.79 m3 68,200.00 1,281,478 128,147.80 1,409,625.80
- Pek. Pasir Urug Bawah Pondasi 2.59 m3 186,076.00 481,937 48,193.68 530,130.52
- Pek. Lantai Kerja K 100 5.18 m3 898,221.59 4,652,788 465,278.78 5,118,066.60
- Pek. Bekisting (2x Pakai) 123.84 m2 95,100.50 11,777,246 1,177,724.59 12,954,970.51
- Pek.Pembesian (Besi Beton Ulir) 5,167.22 Kg 17,674.25 91,326,738 9,132,673.81 100,459,411.89
- Pek. Beton K250 24.55 m3 1,266,988.99 31,104,580 3,110,457.98 34,215,037.73
2. Pondasi Rolag
- Pek. Galian Tanah Pondasi 6.75 m3 94,600.00 638,550 63,855.00 702,405.00
- Pek. Pondasi Rolag 103.54 m2 131,873.50 13,654,182 1,365,418.22 15,019,600.41
III. PEKERJAAN BETON
1. SLOOF BETON
a. Tie Beam TB.1 (30 x 60)
- Bekisting (2x Pakai) 154.18 m2 99,775.50 15,383,387 1,538,338.66 16,921,725.25
- Pek.Pembesian (Besi Beton Polos) 6,114.88 Kg 17,558.75 107,369,649 10,736,964.92 118,106,614.12
- Pek. Beton K250 39.65 m3 1,266,988.99 50,236,114 5,023,611.35 55,259,724.89
2. KOLOM BETON
a. Kolom K1 (50 x 50) Elevasi -3.80 s/d +0.00
- Bekisting (2x Pakai) 150.88 m2 125,477.00 18,931,970 1,893,196.98 20,825,166.74
- Pek.Pembesian (Besi Beton Polos) 2,512.05 Kg 17,558.75 44,108,458 4,410,845.79 48,519,303.73
- Pek. Beton K250 18.86 m3 1,266,988.99 23,895,412 2,389,541.24 26,284,953.63
b. Kolom K1 (50 x 50) Elevasi -3.80 s/d +7.00
- Bekisting (2x Pakai) 226.16 m2 125,477.00 28,377,878 2,837,787.83 31,215,666.15
- Pek.Pembesian (Besi Beton Polos) 3,765.41 Kg 17,558.75 66,115,893 6,611,589.28 72,727,482.12
- Pek. Beton K250 28.27 m3 1,266,988.99 35,817,779 3,581,777.88 39,399,556.69
c. Kolom KP (15 x 15) Elevasi -0.80 s/d +3.00
- Bekisting (2x Pakai) 33.60 m2 125,477.00 4,216,027 421,602.72 4,637,629.92
- Pek.Pembesian (Besi Beton Polos) 270.01 Kg 17,558.75 4,741,038 474,103.81 5,215,141.90
- Pek. Beton K250 1.26 m3 1,266,988.99 1,596,406 159,640.61 1,756,046.74
3. BALOK BETON
a. Balok B1 (30 x 60) Elevasi -0.80 s/d +0.00
- Bekisting (2x Pakai) 435.14 m2 188,113.75 81,855,817 8,185,581.72 90,041,398.89
- Pek.Pembesian (Besi Beton Polos) 10,540.91 Kg 17,558.75 185,085,203 18,508,520.35 203,593,723.81
- Pek. Beton K250 49.73 m3 1,266,988.99 63,007,363 6,300,736.26 69,308,098.83
b. Balok B2 (15 x 30) Elevasi -0.80 s/d +0.00
- Bekisting (2x Pakai) 133.52 m2 188,113.75 25,116,948 2,511,694.79 27,628,642.69
- Pek.Pembesian (Besi Beton Polos) 3,291.25 Kg 17,558.75 57,790,236 5,779,023.59 63,569,259.53
- Pek. Beton K250 7.07 m3 1,266,988.99 8,957,612 895,761.22 9,853,373.39
c. Balok B1 (30 x 60) Elevasi +3.00 s/d +7.00
- Bekisting (2x Pakai) 110.25 m2 188,113.75 20,739,541 2,073,954.09 22,813,495.03
- Pek.Pembesian (Besi Beton Polos) 1,316.78 Kg 17,558.75 23,121,011 2,312,101.08 25,433,111.91
- Pek. Beton K250 13.23 m3 1,266,988.99 16,762,264 1,676,226.44 18,438,490.80
d. Balok B2 (15 x 30) Elevasi +3.00 s/d +7.00
- Bekisting (2x Pakai) 16.35 m2 188,113.75 3,075,660 307,565.98 3,383,225.79
- Pek.Pembesian (Besi Beton Polos) 319.12 Kg 17,558.75 5,603,348 560,334.83 6,163,683.13
- Pek. Beton K250 0.98 m3 1,266,988.99 1,241,649 124,164.92 1,365,814.13
4. PLAT BETON Tebal 12 cm (PLAT BETON LANTAI )
- Pek. Bekisting (2x Pakai) 604.18 m2 216,163.75 130,601,814 13,060,181.45 143,661,995.92
- Waremash m10 830.79 m2 187,248.50 155,564,181 15,556,418.06 171,120,598.64
- Pek. Beton K250 99.69 m3 1,266,988.99 126,306,133 12,630,613.26 138,936,745.88
5. PEK. TANGGA BELAKANG
ELEVASI 0.00 s/d - 3.40
a. Pek. Anak Tangga
- Pek. Beton K250 0.92 m3 1,266,988.99 1,165,630 116,562.99 1,282,192.86
- Pek.Pembesian (Besi Beton Polos) 189.26 Kg 17,558.75 3,323,169 332,316.90 3,655,485.93
- Bekisting (2x Pakai) 6.11 m2 173,401.25 1,059,482 105,948.16 1,165,429.80
b. Pek. Hamparan Tangga
- Pek. Beton K250 1.56 m3 1,266,988.99 1,976,503 197,650.28 2,174,153.11
- Pek.Pembesian (Besi Beton Polos) 161.28 Kg 17,558.75 2,831,875 283,187.52 3,115,062.72
- Bekisting (2x Pakai) 13.01 m2 173,401.25 2,255,950 225,595.03 2,481,545.29
6. PEK. TRIBUN
a. Balok B1 (30 x 60)
- Pek. Bekisting (2x Pakai) 57.33 m2 173,401.25 9,941,094 994,109.37 10,935,203.03
- Pek.Pembesian (Besi Beton Polos) 7,484.83 Kg 17,558.75 131,424,259 13,142,425.88 144,566,684.64
- Pek. Beton K250 6.55 m3 1,266,988.99 8,298,778 829,877.79 9,128,655.69
b. Balok B2 (15 x 30)
- Pek. Bekisting (2x Pakai) 32.79 m2 173,401.25 5,685,827 568,582.70 6,254,409.69
- Pek.Pembesian (Besi Beton Polos) 851.95 Kg 17,558.75 14,959,177 1,495,917.71 16,455,094.77
- Pek. Beton K250 1.74 m3 1,266,988.99 2,204,561 220,456.08 2,425,016.93
c. Plat Beton Tebal 15 cm
- Pek. Bekisting (2x Pakai) 272.49 m2 216,163.75 58,902,460 5,890,246.02 64,792,706.26
- Waremash m10 208.00 Kg 187,248.50 38,947,688 3,894,768.78 42,842,456.60
- Pek. Beton K250 69.76 m3 1,266,988.99 88,385,152 8,838,515.21 97,223,667.29
IV. PEKERJAAN BAJA IWF
- Kolom IWF 300.150.6.5.9 880.80 Kg 35,904.00 31,624,243 3,162,424.32 34,786,667.52
- Baut Angkur 16 24.00 Bh 17,000.00 408,000 40,800.00 448,800.00
- Besi Plat 5 mm 4.00 Bh 80,000.00 320,000 32,000.00 352,000.00
C. PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
a. ELEVASI +0.00 s/d 3.00
1. Pas. Dinding Bata 131.81 m2 131,873.50 17,382,246 1,738,224.60 19,120,470.64
2. Pek. Plasteran Dinding 316.65 m2 67,075.80 21,239,552 2,123,955.21 23,363,507.28
3. Pek. Acian Dinding 316.65 m2 46,268.75 14,651,000 1,465,099.97 16,116,099.66
b. ELEVASI +3.00 s/d 7.00
1. Pas. Dinding Bata 158.33 m2 131,873.50 20,879,531 2,087,953.13 22,967,484.38
2. Pek. Plasteran Dinding 316.65 m2 67,075.80 21,239,552 2,123,955.21 23,363,507.28
3. Pek. Acian Dinding 316.65 m2 46,268.75 14,651,000 1,465,099.97 16,116,099.66
II PEKERJAAN PENUTUP LANTAI
a. LANTAI I/ELEVASI +0.00
1. Granit ukuran 60 x 60 Kasar Ex. Granit Cina 294.71 m2 236,084.75 69,576,537 6,957,653.67 76,534,190.34
2. Granit ukuran 40 x 40 Kasar Ex. Granit Cina 351.43 m2 173,349.00 60,920,039 6,092,003.91 67,012,042.98
3. Granit ukuran 40 x 40 Kasar Ex. Granit Cina ( WC ) 13.62 m2 173,349.00 2,361,013 236,101.34 2,597,114.72
4. Granit ukuran 40 x 40 Kasar Ex. Granit Cina ( Dinding WC ) 16.00 m2 173,349.00 2,773,584 277,358.40 3,050,942.40
5. Granit 40 x 40 Halus Ex. Granit Cina W.Kuning ( Wastafel ) 3.20 m2 173,349.00 554,717 55,471.68 610,188.48
b. ELEVASI +3.40 s/d 6.80 & Tribun
1. Granit ukuran 60 x 60 Kasar Ex. Granit Cina 66.00 m2 236,084.75 15,581,594 1,558,159.35 17,139,752.85
2. Granit ukuran 40 x 40 Kasar Ex. Granit Cina ( Area Tribun ) 293.02 m2 173,349.00 50,794,724 5,079,472.40 55,874,196.38
III. PEKERJAAN KUSEN, PINTU, JENDELA, VENTILASI & ROSTER
1. Pas. Pintu Type P1 5.00 Bh 1,805,988.42 9,029,942 902,994.21 9,932,936.32
2. Pas. Pintu Type P2 1.00 Bh 2,650,972.21 2,650,972 265,097.22 2,916,069.43
3. Pas. Jendela Type J1 2.00 Bh 6,965,969.61 13,931,939 1,393,193.92 15,325,133.15
4. Pas. Ventilasi Type V1 8.00 Bh 188,100.00 1,504,800 150,480.00 1,655,280.00
5. Pas. Ventilasi Type V2 1.00 Bh 8,371,750.00 8,371,750 837,175.00 9,208,925.00
6. Pas. Ventilasi Type V3 12.00 Bh 1,330,000.00 15,960,000 1,596,000.00 17,556,000.00
7. Pas. Ventilasi Type V4 2.00 Bh 7,418,500.00 14,837,000 1,483,700.00 16,320,700.00
IV. PEKERJAAN ATAP
1. Pek. Pipa SCH 20, 4 Inch 15,028.31 Kg 39,603.18 595,168,926 59,516,892.61 654,685,818.75
2. Reng CNP 150.50.20.2 3,992.26 Kg 29,588.59 118,125,364 11,812,536.39 129,937,900.30
3. Penutup Aspal Bitumen CTI 973.34 m2 361,485.30 351,848,102 35,184,810.19 387,032,912.09
4. Nok Aspal Bitumen 42.90 m2 136,121.00 5,839,591 583,959.09 6,423,549.99
V. PEKERJAAN PLAFOND
1. Pas. Rangka Hollow 33.00 m2 91,415.50 3,016,712 301,671.15 3,318,382.65
2. Pas. Plafond Gypsum 9 mm 33.00 m2 52,339.10 1,727,190 172,719.03 1,899,909.33
VI. PEKERJAAN REALING
1. Pas. Handrail & Tiang Besi Hollow 4 x4 + 2 x 2 cm 122.25 m 350,000.00 42,787,500 4,278,750.00 47,066,250.00
VII. PEKERJAAN PENGECATAN
1. Cat Tembok (Ex Mowilex) 895.62 m2 33,616.00 30,107,162 3,010,716.19 33,117,878.11
2. Pek. Cat Plafond 33.00 m2 33,616.00 1,109,328 110,932.80 1,220,260.80
3. Pek. Cat Epoxy Area Lapangan Bulutangkis 166.78 m2 124,201.00 20,714,243 2,071,424.28 22,785,667.06
4. Pengecatan Zinc Chromate Rangka Atap 685.71 m2 52,263.75 35,837,776 3,583,777.60 39,421,553.61
VIII. PEKERJAAN ALLUMINIUM COMPOSITE (ACP)
1. Pekerjaan Alluminium Composite Panel (ACP) TypePVDF T.4 mm + Rangka
- - Pekerjaan Alumunim Composite Panel (ACP) Fasade Atas 385.77 m2 858,342.24 331,122,686 33,112,268.55 364,234,954.08
- - Pekerjaan Alumunim Composite Panel (ACP) Kolom 104.00 m2 858,342.24 89,267,593 8,926,759.29 98,194,352.14
IX. PEKERJAAN TULISAN PAPAN NAMA GEDUNG
1. Tulisan papan nama gedung (Akrilik + Lampu Strep LED) 1.00 Ls 19,000,000.00 19,000,000 1,900,000.00 20,900,000.00
D. PEKERJAAN MEKANIKAL ELEKTRIKAL
I. PEKERJAAN MEKANIKAL
1. PEMIPAAN AIR BERSIH
a. Pipa PVC AW (Incl. Fitting & Accessories)
- PVC AW 1/2 Inchi 51.40 m 32,626.00 1,676,976 167,697.64 1,844,674.04
2. PEMIPAAN AIR KOTOR & AIR BEKAS
- Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- Pipa Pvc Aw 4 Inchi (Ke Drainase) 16.00 m 180,064.50 2,881,032 288,103.20 3,169,135.20
- Pipa Pvc Aw 4 Inchi (Ke Septitank ) 20.00 m 180,064.50 3,601,290 360,129.00 3,961,419.00
3. Septik Tank 2.00 Unit 8,500,000.00 17,000,000 1,700,000.00 18,700,000.00
4. Sambungan PDAM 1.00 Ls 4,500,000.00 4,500,000 450,000.00 4,950,000.00
5. Sanitary
- Pas. Kloset Jongkok 4.00 Bh 3,685,385.00 14,741,540 1,474,154.00 16,215,694.00
- Pas. Wastafel Gantung (Toto) 2.00 Bh 2,309,670.00 4,619,340 461,934.00 5,081,274.00
- Pas. Kran Air 4.00 Bh 56,573.00 226,292 22,629.20 248,921.20
- Pas. Kran Air Wastafel (Toto) 2.00 Bh 187,033.00 374,066 37,406.60 411,472.60
- Pas. Floor drain (Toto) 4.00 Bh 402,325.00 1,609,300 160,930.00 1,770,230.00
II. PEKERJAAN ELEKTRIKAL
1. INSTALASI PANEL
- Pengadaan dan pemasangan panel Box 3.00 Unit 500,000.00 1,500,000 150,000.00 1,650,000.00
- Mcb 4.00 Unit 140,000.00 560,000 56,000.00 616,000.00
2. PEMASANGAN LISTRIK BARU PLN 3500 WATT 1.00 Ls 4,000,000.00 4,000,000 400,000.00 4,400,000.00
3. INSTALASI LAMPU, SAKLAR & STOP KONTAK
- Lampu Sorot LED Philips 100 W 10.00 Bh 1,668,562.50 16,685,625 1,668,562.50 18,354,187.50
- Lampu LED Philips 18 W 9.00 Bh 137,912.50 1,241,213 124,121.25 1,365,333.75
- Stop Kontak 1P, 220 Volt, 13A, Wall Type 4.00 Bh 81,977.50 327,910 32,791.00 360,701.00
- Saklar 1 gang 9.00 Bh 72,902.50 656,123 65,612.25 721,734.75
- Saklar 2 gang 1.00 Bh 88,027.50 88,028 8,802.75 96,830.25
4. INSTALASI PENERANGAN & STOP KONTAK
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu 19.00 Ttk 194,975.00 3,704,525 370,452.50 4,074,977.50
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak 14.00 Ttk 194,975.00 2,729,650 272,965.00 3,002,615.00
E. PEKERJAAN LANSCAPE
I. PEKERJAAN LAMPU LAPANGAN DAN LANDMARK
a. PEKERJAAN LAMPU LAPANGAN
1. Tiang Lampu Menggunakan Pipa SCH 4.00 Bh 9,166,458.56 36,665,834 3,666,583.43 40,332,417.68
2. Lampu Sorot LED 1000 w 4.00 Bh 21,916,125.00 87,664,500 8,766,450.00 96,430,950.00
b. LANDMARK LAPANGAN
1. Signare Huruf Acrylic 1.00 Ls 14,000,000.00 14,000,000 1,400,000.00 15,400,000.00
2. Dudukan
- Sloof 15x15
* Bekisting (2x Pakai) 10.32 m2 99,775.50 1,029,683 102,968.32 1,132,651.48
* Pek.Pembesian (Besi Beton Polos) 112.56 Kg 17,674.25 1,989,414 198,941.36 2,188,354.94
* Pek. Beton K175 0.77 m3 1,109,695.98 854,466 85,446.59 939,912.49
- Kolom 15x15
* Bekisting (2x Pakai) 4.32 m2 125,477.00 542,061 54,206.06 596,266.70
* Pek.Pembesian (Besi Beton Polos) 112.56 Kg 17,674.25 1,989,414 198,941.36 2,188,354.94
* Pek. Beton K175 0.32 m3 1,109,695.98 355,103 35,510.27 390,612.98
- Ringbalk 15x15
* Bekisting (2x Pakai) 27.52 m2 188,113.75 5,176,890 517,689.04 5,694,579.44
* Pek.Pembesian (Besi Beton Polos) 112.56 Kg 17,674.25 1,989,414 198,941.36 2,188,354.94
* Pek. Beton K175 3.61 m3 1,109,695.98 4,006,002 400,600.25 4,406,602.72
- Pasangan Batu Merah 19.45 m2 131,873.50 2,564,940 256,493.96 2,821,433.53
- Plesteran Dinding 17.70 m2 67,075.80 1,187,242 118,724.17 1,305,965.83
- Acian Dinding 47.56 m2 46,268.75 2,200,542 220,054.18 2,420,595.93
- Pengecatan Dinding 47.56 m2 33,616.00 1,598,777 159,877.70 1,758,654.66
II PEKERJAAN LAPANGAN
a. LAPANGAN VOLLY (DUA)
1. Galian 6.30 m3 94,600.00 595,980 59,598.00 655,578.00
2. Pek. Rolag 35.00 m2 131,873.50 4,615,573 461,557.25 5,077,129.75
3. Urugan Pasir T 5cm 26.40 m3 186,076.00 4,912,406 491,240.64 5,403,647.04
4. Pek.Beton K.200 52.80 m3 1,148,920.58 60,663,007 6,066,300.66 66,729,307.25
5. Pek. Pengecetan Lapangan Volly ( Sportkote ) 324.00 m2 40,269.35 13,047,269 1,304,726.94 14,351,996.34
b. LAPANGAN BASKET
1. Galian Pondasi 4.23 m3 94,600.00 400,158 40,015.80 440,173.80
2. Pek. Rolag 23.50 m2 131,873.50 3,099,027 309,902.73 3,408,929.98
3. Urugan Pasir T 5cm 25.50 m3 186,076.00 4,744,938 474,493.80 5,219,431.80
4. Pek.Beton K.200 51.00 m3 1,148,920.58 58,594,950 5,859,494.95 64,454,444.50
6. Pek. Pengecetan Lapangan Basket ( Sportkote ) 510.00 m2 40,269.35 20,537,369 2,053,736.85 22,591,105.35
c. TENIS LAPANGAN
1. Galian Pondasi 2.70 m3 94,600.00 255,420 25,542.00 280,962.00
2. Pek. Rolag 22.50 m2 131,873.50 2,967,154 296,715.38 3,263,869.13
3. Urugan Pasir T 5cm 22.50 m3 186,076.00 4,186,710 418,671.00 4,605,381.00
4. Pek.Beton K.200 45.00 m3 1,148,920.58 51,701,426 5,170,142.61 56,871,568.68
5. Pek. Pengecetan Lapangan Tenis ( Sportkote ) 259.99 m2 40,269.35 10,469,628 1,046,962.83 11,516,591.14
6. Perbaikan Rang Keliling
- Sloof 15x15
* Bekisting (2x Pakai) 21.60 m2 99,775.50 2,155,151 215,515.08 2,370,665.88
* Pek.Pembesian (Besi Beton Polos) 169.07 Kg 17,674.25 2,988,185 298,818.54 3,287,003.99
* Pek. Beton K175 1.62 m3 1,109,695.98 1,797,707 179,770.75 1,977,478.23
- Pipa Gip 1.5 Inchi + Pengelasan 48.00 m 110,650.10 5,311,205 531,120.48 5,842,325.28
- Rang Kawat Harmonika 121.00 m2 85,082.80 10,295,019 1,029,501.88 11,324,520.68
7. Lampu Sorot LED 50 watt 6.00 Bh 800,387.50 4,802,325 480,232.50 5,282,557.50
Jumlah 4,919,482,118.55
Kepada Yth:
Pokja I Pemerintah Daerah
Kabupaten Enrekang
Kabupaten Enrekang
di,-
Tempat
Nomor : 23201231/1/2021/7
Perihal : Penawaran Pekerjaan Pembangunan Pusat Sarana Olahraga Baraka (PEN)..
Sehubungan dengan pengumuman Tender dengan Pascakualifikasi dan Dokumen Pemilihan Nomor:
48/DOKPIL/KONSTR/VII/2021 tanggal 15 Juli 2021 dan setelah kami pelajari dengan seksama Dokumen
Pemilihan dan Berita Acara Pemberian Penjelasan (serta adendum Dokumen Pemilihan), dengan ini kami
mengajukan penawaran untuk pekerjaan Pembangunan Pusat Sarana Olahraga Baraka (PEN) sebesar
Surat Penawaran Rp. 4.919.482.100,- (Empat Milyar Sembilan Ratus Sembilan Belas Juta Empat Ratus
Delapan Puluh Dua Ribu Seratus Rupiah) termasuk PPN
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen
Pemilihan untuk melaksanakan pekerjaan tersebut di atas.
Penawaran ini berlaku selama 60 hari kerja, sejak batas akhir pemasukan dokumen penawaran.
Sesuai dengan persyaratan pada Dokumen Pemilihan, bersama ini Surat Penawaran kami
lampirkan Persyaratan Dokumen dan Penawaran Harga.
semua ketentuan yang tercantum dalam Dokumen Pemilihan. Apabila dana dalam dokumen anggaran yang
telah disahkan tidak tersedia atau tidak cukup tersedia dalam DIPA/DPA Tahun Anggaran, maka
M. FATHIL FATHAN AI
Direktur
REKAPITULASI
TERBILANGTiga milyar enam puluh tiga juta tujuh ratus delapan puluh delapan ribu lima ratus empat puluh rupiah
RENCANA ANGGARAN BIAYA
3,063,788,540.92
3,063,788,540.92
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
A PEKERJAAN PENDAHULUAN
1. Pagar sementara dari seng gelombang tinggi 2 meter tiap 1 m'
Harga bahan:
- Kayu dolken Ø 8-10/400 cm btg 1.250 19,335.03 24,168.79
- Semen portland kg 2.500 1,521.52 3,803.80
- Pasir beton m³ 0.005 355,680.00 1,778.40
- Batu pecah/split 2/3 m³ 0.009 168,355.20 1,515.20
- Kayu Meranti Palembang kaso m³ 0.072 4,347,200.00 312,998.40
- Paku biasa 2"-5" kg 0.060 20,748.00 1,244.88
- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 1.200 43,472.00 52,166.40
- Cat meni besi kg 0.450 10,214.96 4,596.73
Jumlah Harga Bahan 402,272.60
Upah tenaga:
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Pekerja Oh 0.400 63,492.89 25,397.16
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.020 97,412.42 1,948.25
Jumlah Upah Tenaga 44,025.27
Jumlah Total 446,297.87
Dibulatkan 446,290.00
2. Pagar sementara dari kawat duri tinggi 1,8 meter tiap 1 m'
Harga bahan:
- Kayu dolken Ø 8-10/400 cm btg 1.000 19,335.03 19,335.03
- Semen portland kg 2.000 1,521.52 3,043.04
- Pasir beton m³ 0.005 355,680.00 1,778.40
- Batu pecah/split 2/3 m³ 0.009 168,355.20 1,515.20
- Paku biasa 2"-5" kg 0.060 20,748.00 1,244.88
- Kawat duri (10kg/60m/rol) kg 2.500 11,757.20 29,393.00
Jumlah Harga Bahan 56,309.55
Upah tenaga:
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Pekerja Oh 0.300 63,492.89 19,047.87
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.020 97,412.42 1,948.25
Jumlah Upah Tenaga 37,675.98
Jumlah Total 93,985.53
Dibulatkan 93,980.00
3 Pagar perimeter dari kawat duri tinggi 1,5 meter tiap 1 m'
Harga bahan:
- Pipa galvanis dia 2 ½" btg 0.556 24,140.77 13,411.54
- Semen portland kg 2.000 1,521.52 3,043.04
- Pasir beton m³ 0.005 355,680.00 1,778.40
- Batu pecah/split 2/3 m³ 0.009 168,355.20 1,515.20
- Paku biasa 2"-5" kg 0.060 20,748.00 1,244.88
- Kawat duri (10kg/60m/rol) kg 5.000 11,757.20 58,786.00
Jumlah Harga Bahan 79,779.06
Upah tenaga:
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Pekerja Oh 0.300 63,492.89 19,047.87
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.020 97,412.42 1,948.25
Jumlah Upah Tenaga 37,675.98
Jumlah Total 117,455.03
Dibulatkan 117,450.00
4 Pagar perimeter dari kawat duri tinggi 70 cm tiap 1 m'
Harga bahan:
- Besi siku kg 6.750 13,832.00 93,366.00
- Semen portland kg 2.000 1,521.52 3,043.04
- Pasir beton m³ 0.005 355,680.00 1,778.40
- Batu pecah/split 2/3 m³ 0.009 168,355.20 1,515.20
- Paku biasa 2"-5" kg 0.060 20,748.00 1,244.88
- Kawat duri (10kg/60m/rol) kg 0.050 11,757.20 587.86
Jumlah Harga Bahan 101,535.38
Upah tenaga:
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Pekerja Oh 0.300 63,492.89 19,047.87
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.020 97,412.42 1,948.25
Jumlah Upah Tenaga 37,675.98
Jumlah Total 139,211.35
Dibulatkan 139,210.00
5. Pembuatan kantor sementara, dengan lantai plesteran tiap 1 m2
Harga bahan:
- Kayu dolken Ø 8-10/400 cm btg 1.250 19,335.03 24,168.79
- Kayu Meranti Palembang kaso m³ 0.180 4,347,200.00 782,496.00
- Paku biasa 2"-5" kg 0.850 20,748.00 17,635.80
- Besi pelat strip kg 1.100 10,789.79 11,868.77
- Semen portland kg 35.000 1,521.52 53,253.20
- Pasir pasang m³ 0.150 355,680.00 53,352.00
- Pasir beton m³ 0.100 355,680.00 35,568.00
- Batu pecah/split 2/3 m³ 0.150 168,355.20 25,253.28
- Bata merah bh 30.000 1,976.00 59,280.00
- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 0.250 43,472.00 10,868.00
- Jendela nako (rangka) daun 2.000 29,129.83 58,259.65
- Kaca 3 mm m² 0.080 48,337.58 3,867.01
- Kunci tanam sederhana bh 0.150 60,984.31 9,147.65
- Teakwood 4x8 ft 3 mm lbr 0.060 102,752.00 6,165.12
Jumlah Harga Bahan 1,151,183.27
Upah tenaga:
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Tukang batu Oh 1.000 74,788.75 74,788.75
- Pekerja Oh 1.000 63,492.89 63,492.89
- Kepala tukang Oh 0.300 86,105.63 25,831.69
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 318,561.45
Jumlah Total 1,469,744.72
Dibulatkan 1,469,740.00
6. Pembuatan kantor sementara dengan lantai plesteran + meja & bangku kayu tiap 1 m2
Harga bahan:
- Semen portland kg 20.000 1,521.52 30,430.40
- Pasir beton m³ 0.040 355,680.00 14,227.20
- Batu pecah/split 2/3 m³ 0.067 168,355.20 11,212.46
- Kayu Meranti Palembang kaso m³ 0.048 4,347,200.00 208,230.88
- Paku biasa 2"-5" kg 0.270 20,748.00 5,601.96
- Paku biasa 1/2"- 1" kg 0.079 25,688.00 2,029.35
- Triplek 4x8 ft 4 mm lbr 1.189 145,236.00 172,685.60
- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 1.158 43,472.00 50,340.58
- Jendela nako (rangka) daun 0.541 29,129.83 15,759.24
- Besi segi empat 3/8"x3/8" (0,83kg/m') kg 0.269 14,727.94 3,961.82
- Kaca 6 mm m² 0.049 85,322.42 4,180.80
- Engsel pintu Type SEL FB08 4x3x3 4BB US 32D ex Fino setar set 0.078 #N/A #N/A
- Kunci tanam sederhana bh 0.078 60,984.31 4,756.78
Harga bahan untuk meja & kursi sederhana:
- Triplek 4x8 ft 6 mm lbr 0.051 224,276.00 11,438.08
- Kayu Meranti Palembang kaso m³ 0.010 4,347,200.00 43,472.00
- Kayu Meranti Palembang papan m³ 0.004 5,434,000.00 21,736.00
- Paku biasa 2"-5" kg 0.074 20,748.00 1,535.35
- Paku biasa 1/2"- 1" kg 0.007 25,688.00 179.82
Jumlah Harga Bahan #N/A
Upah tenaga:
- Pekerja Oh 0.931 63,492.89 59,111.88
- Tukang kayu Oh 1.319 74,788.75 98,646.36
- Tukang batu Oh 0.022 74,788.75 1,645.35
- Kepala tukang Oh 0.135 86,105.63 11,624.26
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 174,924.35
Jumlah Total #N/A
Dibulatkan #N/A
7. Pembuatan gudang semen dan peralatan tiap 1 m2
Harga bahan:
- Kayu dolken Ø 8-10/400 cm btg 1.700 19,335.03 32,869.56
- Kayu Meranti Palembang kaso m³ 0.210 4,347,200.00 912,912.00
- Paku biasa 2"-5" kg 0.300 20,748.00 6,224.40
- Semen portland kg 10.500 1,521.52 15,975.96
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pasir beton m³ 0.030 355,680.00 10,670.40
- Batu pecah/split 2/3 m³ 0.050 168,355.20 8,417.76
- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 1.500 43,472.00 65,208.00
Jumlah Harga Bahan 1,052,278.08
Upah tenaga:
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Pekerja Oh 1.000 63,492.89 63,492.89
- Kepala tukang Oh 0.300 86,105.63 25,831.69
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 243,772.70
Jumlah Total 1,296,050.78
Dibulatkan 1,296,050.00
8. Pembuatan jalan sementara tebal 20 cm tiap 1 m2
Harga bahan:
- Batu belah 15/20 m³ 0.150 179,025.60 26,853.84
- Batu pecah 5/7 m³ 0.090 380,577.60 34,251.98
- Pasir pasang m³ 0.010 355,680.00 3,556.80
Jumlah Harga Bahan 64,662.62
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 68,363.51
Jumlah Total 133,026.13
Dibulatkan 133,020.00
9. Pembuatan jalan sementara tebal 25 cm tiap 1 m2
Harga bahan:
- Batu belah 15/20 m³ 0.275 179,025.60 49,232.04
- Batu pecah/split 3/5 m³ 0.030 147,014.40 4,410.43
- Pasir pasang m³ 0.050 355,680.00 17,784.00
Jumlah Harga Bahan 71,426.47
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Mandor Oh 0.100 97,412.42 9,741.24
Jumlah Upah Tenaga 73,234.13
Jumlah Total 144,660.60
Dibulatkan 144,660.00
10. Pasang bouwplank tiap 1 m'
Harga bahan:
- Kayu Meranti Palembang papan m³ 0.007 5,434,000.00 38,038.00
- Kayu Meranti Palembang kaso m³ 0.012 4,347,200.00 52,166.40
- Paku biasa 2"-5" kg 0.020 20,748.00 414.96
Jumlah Harga Bahan 90,619.36
Upah tenaga:
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Pekerja Oh 0.100 63,492.89 6,349.29
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 15,176.28
Jumlah Total 105,795.64
Dibulatkan 105,790.00
11 Membersihkan puing-puing tiap 1 m2
- Pekerja Oh 0.200 63,492.89 12,698.58
Jumlah Upah Tenaga 12,698.58
Dibulatkan 12,690.00
12 Papan nama proyek
Harga bahan:
- Triplek 4x8 ft 12 mm lbr 1.000 100,878.44 100,878.44
- Kayu Kamper Medan/Kruing balok m³ 0.077 4,791,725.70 368,962.88
- Paku biasa 2"-5" kg 1.250 20,748.00 25,935.00
- Cat kayu/besi Mowilex (cat penutup) kg 2.500 51,376.00 128,440.00
Jumlah Harga Bahan 495,776.31
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 1.000 74,788.75 74,788.75
- Kepala tukang Oh 0.100 86,105.63 8,610.56
- Tukang cat Oh 1.500 74,788.75 112,183.13
- Mandor Oh 0.100 97,412.42 9,741.24
Jumlah Upah Tenaga 268,816.57
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Total 764,592.88
Dibulatkan 764,590.00
B PEKERJAAN TANAH
1. Pembersihan lapangan dan perataan tiap 1 m2
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Mandor Oh 0.050 97,412.42 4,870.62 0.01
Jumlah Upah Tenaga 11,219.91
Jumlah Total 11,219.91
Dibulatkan 11,210.00
2. Pekerjaan stripping setinggi 1 meter tiap 1 m3
Upah tenaga:
- Pekerja Oh 0.050 63,492.89 3,174.64
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 3,661.71
Jumlah Total 3,661.71
Dibulatkan 3,660.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pekerja Oh 1.200 63,492.89 76,191.47
- Mandor Oh 0.045 97,412.42 4,383.56
Jumlah Upah Tenaga 80,575.02
Jumlah Total 80,575.02
Dibulatkan 80,570.00
10. Pembuangan tanah sejauh 150 m tiap 1 m3
Upah tenaga:
- Pekerja Oh 0.516 63,492.89 32,762.33
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 37,632.95
Jumlah Total 37,632.95
Dibulatkan 37,630.00
11. Urugan tanah kembali tiap 1 m3
Upah tenaga:
- Pekerja Oh 0.250 63,492.89 15,873.22
- Mandor Oh 0.008 97,412.42 808.52
Jumlah Upah Tenaga 16,681.74
Jumlah Total 16,681.74
Dibulatkan 16,680.00
12. Urugan tanah mendatangkan tiap 1 m3
Harga bahan:
- Tanah merah m³ 1.200 73,507.20 88,208.64
Jumlah Harga Bahan 88,208.64
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 20,021.99
Jumlah Total 108,230.63
Dibulatkan 108,230.00
13. Mengangkut tanah sejauh 30 m tiap 1 m3
Upah tenaga:
- Pekerja Oh 0.330 63,492.89 20,952.65
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 21,926.78
Dibulatkan 21,920.00
14. Menghampar tanah dengan menghampar tiap 1 m3
Upah tenaga:
- Pekerja Oh 0.250 63,492.89 15,873.22
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 16,847.35
Dibulatkan 16,840.00
15. Pemadatan tanah (tenaga manusia) tiap 1 m3
Upah tenaga:
- Pekerja Oh 0.500 63,492.89 31,746.44
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 36,617.06
Jumlah Total 36,617.06
Dibulatkan 36,610.00
16. Pemadatan tanah (tenaga manusia) tebal 20 cm tiap 1 m2
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 7,323.41
Jumlah Total 7,323.41
Dibulatkan 7,320.00
17. Pemadatan tanah dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m3
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Harga pemakaian alat:
- TAMPER / HAND COMPACTOR jam 0.289
29,797.24 8,617.36
Jumlah Bahan & Tenaga & Alat 8,617.36
Jumlah Total 8,617.36
Dibulatkan 8,617.00
18. Pemadatan tanah tebal 20 cm dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m2
Harga pemakaian alat:
- TAMPER / HAND COMPACTOR jam 0.058 29,797.24 1,725.26
Jumlah Bahan & Tenaga & Alat 1,725.26
Jumlah Total 1,725.26
Dibulatkan 1,726.00
19. Pemadatan tanah dengan tamper/hand compactor 10 lintasan / tebal 20cm tiap 1 m3
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Dibulatkan 105,090.00
24. Urugan pasir urug tiap 1 m3
Harga bahan:
- Pasir urug m³ 1.200 78,249.60 93,899.52
Jumlah Harga Bahan 93,899.52
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 20,021.99
Jumlah Total 113,921.51
Dibulatkan 113,920.00
25. Urugan tanah merah tiap 1 m3
Harga bahan:
- Tanah merah m³ 1.200 73,507.20 88,208.64
Jumlah Harga Bahan 88,208.64
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 20,021.99
Jumlah Total 108,230.63
Dibulatkan 108,230.00
26. Urugan pasir pasang tiap 1 m3
Harga bahan:
- Pasir pasang m³ 1.200 355,680.00 426,816.00
Jumlah Harga Bahan 426,816.00
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 20,021.99
Jumlah Total 446,837.99
Dibulatkan 446,830.00
27. Pemancangan tiang/cerucuk dolken dia 8 - 10 / 400 cm dalam 2 m' tiap 1 titik
Harga bahan:
- Kayu dolken Ø 8-10/400 cm btg 0.550 19,335.03 10,634.27
Jumlah Harga Bahan 10,634.27
Upah tenaga:
- Pekerja Oh 0.050 63,492.89 3,174.64
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 3,661.71
Jumlah Total 14,295.97
Dibulatkan 14,290.00
28. Pemancangan tiang/cerucuk dolken dia 8 - 10 / 400 cm dalam 4 m' tiap 1 titik
Harga bahan:
- Kayu dolken Ø 8-10/400 cm btg 1.100 19,335.03 21,268.54
Jumlah Harga Bahan 21,268.54
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 7,323.41
Jumlah Total 28,591.95
Dibulatkan 28,590.00
29. Pemasangan lapisan ijuk tiap 1 m2
Harga bahan:
- Ijuk ikatan kg 6.000 7,595.74 45,574.43
Jumlah Harga Bahan 45,574.43
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 10,985.12
Jumlah Total 56,559.55
Dibulatkan 56,550.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Harga Bahan 772,951.92
Upah tenaga:
- Pekerja Oh 1.500 63,492.89 95,239.33
- Tukang batu Oh 0.600 74,788.75 44,873.25
- Kepala tukang Oh 0.060 86,105.63 5,166.34
- Mandor Oh 0.075 97,412.42 7,305.93
Jumlah Upah Tenaga 152,584.85
Jumlah Total 925,536.77
Dibulatkan 925,530.00
2. Pasang pondasi/pasangan batu kali/belah 1 Pc : 3 Ps tiap 1 m3
Harga bahan:
- Batu belah 15/20 m³ 1.200 179,025.60 214,830.72
- Semen portland kg 202.000 1,521.52 307,347.04
- Pasir pasang m³ 0.485 355,680.00 172,504.80
Jumlah Harga Bahan 694,682.56
Upah tenaga:
- Pekerja Oh 1.500 63,492.89 95,239.33
- Tukang batu Oh 0.750 74,788.75 56,091.56
- Kepala tukang Oh 0.075 86,105.63 6,457.92
- Mandor Oh 0.075 97,412.42 7,305.93
Jumlah Upah Tenaga 165,094.75
Jumlah Total 859,777.31
Dibulatkan 859,770.00
3. Pasang pondasi/pasangan batu kali/belah 1 Pc : 4 Ps tiap 1 m3
Harga bahan:
- Batu belah 15/20 m³ 1.200 179,025.60 214,830.72
- Semen portland kg 163.000 1,521.52 248,007.76
- Pasir pasang m³ 0.520 355,680.00 184,953.60
Jumlah Harga Bahan 647,792.08
Upah tenaga:
- Pekerja Oh 1.500 63,492.89 95,239.33
- Tukang batu Oh 0.750 74,788.75 56,091.56
- Kepala tukang Oh 0.075 86,105.63 6,457.92
- Mandor Oh 0.075 97,412.42 7,305.93
Jumlah Upah Tenaga 165,094.75
Jumlah Total 812,886.83
Dibulatkan 812,880.00
4. Pasang pondasi/pasangan batu kali/belah 1 Pc : 5 Ps tiap 1 m3
Harga bahan:
- Batu belah 15/20 m³ 1.200 179,025.60 214,830.72
- Semen portland kg 136.000 1,521.52 206,926.72
- Pasir pasang m³ 0.544 355,680.00 193,489.92
Jumlah Harga Bahan 615,247.36
Upah tenaga:
- Pekerja Oh 1.500 63,492.89 95,239.33
- Tukang batu Oh 0.750 74,788.75 56,091.56
- Kepala tukang Oh 0.075 86,105.63 6,457.92
- Mandor Oh 0.075 97,412.42 7,305.93
Jumlah Upah Tenaga 165,094.75
Jumlah Total 780,342.11
Dibulatkan 780,340.00
5. Pasang pondasi batu kosong (aanstamping) tiap 1 m3
Harga bahan:
- Batu belah 15/20 m³ 1.200 179,025.60 214,830.72
- Pasir urug m³ 0.432 78,249.60 33,803.83
Jumlah Harga Bahan 248,634.55
Upah tenaga:
- Pekerja Oh 0.780 63,492.89 49,524.45
- Tukang batu Oh 0.390 74,788.75 29,167.61
- Kepala tukang Oh 0.039 86,105.63 3,358.12
- Mandor Oh 0.039 97,412.42 3,799.08
Jumlah Upah Tenaga 85,849.27
Jumlah Total 334,483.82
Dibulatkan 334,480.00
6. Pasang pondasi siklop 40% batu kali tiap 1 m3
Harga bahan:
- Besi beton ulir kg 75.000 11,174.28 838,071.00
- Semen portland kg 202.000 1,521.52 307,347.04
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pasir beton kg 0.320 355,680.00 113,817.60
- Koral beton m³ 0.490 388,876.80 190,549.63
- Kawat beton kg 0.800 30,628.00 24,502.40
Jumlah Harga Bahan 1,474,287.67
Upah tenaga:
- Pekerja Oh 3.000 63,492.89 190,478.66
- Tukang batu Oh 0.850 74,788.75 63,570.44
- Kepala tukang Oh 0.085 86,105.63 7,318.98
- Mandor Oh 0.150 97,412.42 14,611.86
Jumlah Upah Tenaga 275,979.94
Jumlah Total 1,750,267.61
Dibulatkan 1,750,260.00
7. Pasang pondasi sumuran diameter 100 cm tiap 1 m3
Harga bahan:
- Batu belah 15/20 m³ 0.450 179,025.60 80,561.52
- Semen portland kg 194.000 1,521.52 295,174.88
- Pasir beton m³ 0.312 355,680.00 110,972.16
- Koral beton m³ 0.468 388,876.80 181,994.34
Jumlah Harga Bahan 668,702.90
Upah tenaga:
- Pekerja Oh 2.380 63,492.89 151,113.07
- Tukang batu Oh 0.800 74,788.75 59,831.00
- Kepala tukang Oh 0.080 86,105.63 6,888.45
- Mandor Oh 0.119 97,412.42 11,592.08
Jumlah Upah Tenaga 229,424.60
Jumlah Total 898,127.50
Dibulatkan 898,120.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
D PEKERJAAN DINDING
1. Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps tiap 1m2
Catatan: Ukuran bata 22 x 11 x 5 cm.
Harga bahan:
- Bata merah bh 140.000 1,976.00 276,640.00
- Semen portland kg 43.500 1,521.52 66,186.12
- Pasir pasang m³ 0.080 355,680.00 28,454.40
Jumlah Harga Bahan 371,280.52
Upah tenaga:
- Pekerja Oh 0.600 63,492.89 38,095.73
- Tukang batu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 57,697.97
Jumlah Total 428,978.49
Dibulatkan 428,970.00
2. Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps tiap 1m2
Harga bahan:
- Bata merah bh 140.000 1,976.00 276,640.00
- Semen portland kg 26.550 1,521.52 40,396.36
- Pasir pasang m³ 0.093 355,680.00 33,078.24
Jumlah Harga Bahan 350,114.60
Upah tenaga:
- Pekerja Oh 0.600 63,492.89 38,095.73
- Tukang batu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 57,697.97
Jumlah Total 407,812.56
Dibulatkan 407,810.00
3. Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps tiap 1m2
Harga bahan:
- Bata merah bh 70.000 1,976.00 138,320.00
- Semen portland kg 18.950 1,521.52 28,832.80
- Pasir pasang m³ 0.038 355,680.00 13,515.84
Jumlah Harga Bahan 180,668.64
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 28,848.98
Jumlah Total 209,517.63
Dibulatkan 209,510.00
4. Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps tiap 1m2
Harga bahan:
- Bata merah bh 70.000 1,976.00 138,320.00
- Semen portland kg 11.500 1,521.52 17,497.48
- Pasir pasang m³ 0.043 355,680.00 15,294.24
Jumlah Harga Bahan 171,111.72
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 28,848.98
Jumlah Total 199,960.70
Dibulatkan 199,960.00
5. Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps tiap 1m2
Harga bahan:
- Bata merah bh 70.000 1,976.00 138,320.00
- Semen portland kg 9.680 1,521.52 14,728.31
- Pasir pasang m³ 0.045 355,680.00 16,005.60
Jumlah Harga Bahan 169,053.91
Upah tenaga:
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 28,848.98
Jumlah Total 197,902.90
Dibulatkan 197,900.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
6. Pasangan bata merah 1 Pc : 2 Ps tiap 1m3 (dibagi tebal bata 11 cm)
Catatan: Analisis ini digunakan untuk menghitung pasangan bata dengan ketebalan dinding selain 1/2 bata & 1 bata.
Harga bahan:
- Bata merah bh 637.000 1,976.00 1,258,712.00
- Semen portland kg 172.270 1,521.52 262,112.25
- Pasir pasang m³ 0.345 355,680.00 122,709.60
Jumlah Harga Bahan 1,643,533.85
Upah tenaga:
- Pekerja Oh 2.900 63,492.89 184,129.37
- Tukang batu Oh 0.900 74,788.75 67,309.88
- Kepala tukang Oh 0.090 86,105.63 7,749.51
- Mandor Oh 0.136 97,412.42 13,248.09
Jumlah Upah Tenaga 272,436.85
Jumlah Total 1,915,970.70
Dibulatkan 1,915,970.00
7. Pasangan bata merah 1 Pc : 4 Ps tiap 1m3 (dibagi tebal bata 11 cm)
Catatan: Analisis ini digunakan untuk menghitung pasangan bata dengan ketebalan dinding selain 1/2 bata & 1 bata.
Harga bahan:
- Bata merah bh 637.000 1,976.00 1,258,712.00
- Semen portland kg 104.550 1,521.52 159,074.92
- Pasir pasang m³ 0.391 355,680.00 139,070.88
Jumlah Harga Bahan 1,556,857.80
Upah tenaga:
- Pekerja Oh 2.900 63,492.89 184,129.37
- Tukang batu Oh 0.900 74,788.75 67,309.88
- Kepala tukang Oh 0.090 86,105.63 7,749.51
- Mandor Oh 0.136 97,412.42 13,248.09
Jumlah Upah Tenaga 272,436.85
Jumlah Total 1,829,294.64
Dibulatkan 1,829,290.00
8. Pasangan dinding batako tiap 1m2
Harga bahan:
- Batako bh 12.500 3,952.00 49,400.00
- Semen portland kg 12.500 1,521.52 19,019.00
- Pasir pasang m³ 0.040 355,680.00 14,227.20
Jumlah Harga Bahan 82,646.20
Upah tenaga:
- Pekerja Oh 0.500 63,492.89 31,746.44
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.025 97,412.42 2,435.31
Jumlah Upah Tenaga 42,521.69
Jumlah Total 125,167.89
Dibulatkan 125,160.00
9. Pasangan dinding hebel t = 7,5 cm dengan perekat mortar tiap 1m2
Harga bahan:
- Hebel uk.60x20x7,5 bh 8.500 6,277.22 53,356.36
- Perekat MU-380 (perekat) kg 2.400 3,026.35 7,263.25
Jumlah Harga Bahan 60,619.60
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 33,018.95
Jumlah Total 93,638.55
Dibulatkan 93,630.00
10. Pasangan dinding hebel t = 10 cm dengan perekat mortar tiap 1m2
Harga bahan:
- Hebel uk.60x20x10 bh 8.500 8,369.88 71,143.94
- Perekat MU-380 (perekat) kg 3.200 3,026.35 9,684.33
Jumlah Harga Bahan 80,828.27
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 33,018.95
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Total 113,847.22
Dibulatkan 113,840.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
11. Pasangan rollag bata merah 1 Pc : 5 Ps , tiap 1 m' (1 lapis bata)
Harga bahan:
- Bata merah bh 16.000 1,976.00 31,616.00
- Semen portland kg 2.442 1,521.52 3,715.55
- Pasir pasang m³ 0.011 355,680.00 3,990.73
Jumlah Harga Bahan 39,322.28
Upah tenaga:
- Pekerja Oh 0.072 63,492.89 4,539.74
- Tukang batu Oh 0.022 74,788.75 1,645.35
- Kepala tukang Oh 0.002 86,105.63 189.43
- Mandor Oh 0.003 97,412.42 321.46
Jumlah Upah Tenaga 6,695.99
Jumlah Total 46,018.27
Dibulatkan 46,010.00
12. Pasangan rollag bata merah 1 Pc : 4 Ps , tiap 1 m' (2 lapis bata)
Harga bahan:
- Bata merah bh 32.000 1,976.00 63,232.00
- Semen portland kg 7.318 1,521.52 11,134.48
- Pasir pasang m³ 0.027 355,680.00 9,745.63
Jumlah Harga Bahan 84,112.12
Upah tenaga:
- Pekerja Oh 0.174 63,492.89 11,047.76
- Tukang batu Oh 0.054 74,788.75 4,038.59
- Kepala tukang Oh 0.005 86,105.63 464.97
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 16,330.62
Jumlah Total 100,442.74
Dibulatkan 100,440.00
13. Pasangan dinding hollowblock HB 20 tiap 1m2, spesi 1:4
Harga bahan:
- Hollow block HB. 20 bh 12.500 3,572.78 44,659.72
- Semen portland kg 24.560 1,521.52 37,368.53
- Pasir pasang m³ 0.077 355,680.00 27,458.50
- Besi beton polos kg 0.280 10,868.00 3,043.04
Jumlah Harga Bahan 112,529.79
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 33,018.95
Jumlah Total 145,548.74
Dibulatkan 145,540.00
14. Pasangan dinding hollowblock HB 15 tiap 1m2, spesi 1:4
Harga bahan:
- Hollow block HB. 15 bh 12.500 3,110.42 38,880.23
- Semen portland kg 18.200 1,521.52 27,691.66
- Pasir pasang m³ 0.058 355,680.00 20,700.58
- Besi beton polos kg 0.280 10,868.00 3,043.04
Jumlah Harga Bahan 90,315.51
Upah tenaga:
- Pekerja Oh 0.360 63,492.89 22,857.44
- Tukang batu Oh 0.120 74,788.75 8,974.65
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pasir pasang m³ 0.039 355,680.00 13,800.38
- Besi beton polos kg 0.280 10,868.00 3,043.04
Jumlah Harga Bahan 68,925.61
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 28,848.98
Jumlah Total 97,774.59
Dibulatkan 97,770.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
16. Pasangan dinding Roster bata merah 12 x 24 x 10 tiap 1m2, spesi 1:3
Harga bahan:
- Roster bata merah 12 x 24 x 10 bh 30.000 3,325.63 99,768.77
- Semen portland kg 14.000 1,521.52 21,301.28
- Pasir pasang m³ 0.032 355,680.00 11,381.76
Jumlah Harga Bahan 132,451.81
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 28,848.98
Jumlah Total 161,300.80
Dibulatkan 161,300.00
17. Pasangan dinding Roster beton 20 x 20 x 7 tiap 1m2
Harga bahan:
- Roster beton 20 x 20 x 7 bh 23.000 4,232.69 97,351.89
- Semen portland kg 10.450 1,521.52 15,899.88
- Pasir pasang m³ 0.038 355,680.00 13,515.84
Jumlah Harga Bahan 126,767.62
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 28,848.98
Jumlah Total 155,616.60
Dibulatkan 155,610.00
18. Pasangan dinding Glass block 20 x 20 x 10 tiap 1m2
Harga bahan:
- Glass block 20 x 20 x 10 bh 25.000 32,604.00 815,100.00
- Semen portland kg 11.500 1,521.52 17,497.48
- Pasir pasang m³ 0.042 355,680.00 14,938.56
Jumlah Harga Bahan 847,536.04
Upah tenaga:
- Pekerja Oh 0.360 63,492.89 22,857.44
- Tukang batu Oh 0.120 74,788.75 8,974.65
- Kepala tukang Oh 0.012 86,105.63 1,033.27
- Mandor Oh 0.018 97,412.42 1,753.42
Jumlah Upah Tenaga 34,618.78
Jumlah Total 882,154.82
Dibulatkan 882,150.00
E PEKERJAAN PLESTERAN
1. Plesteran 1 Pc : 2 Ps tebal 15 mm tiap 1m2
Catatan: Analisis E1 s/d E14 pekerjaan plesteran sudah termasuk acian & benangan/ tali air untuk sudut & siku bangunan, kecuali benangan/ tali air untuk
ornamen/ variasi/ skoning dihitung tersendiri. Plesteran tebal 15 mm untuk bangunan gedung & rumah; plesteran 20-30 mm untuk bangunan air, saluran, dll.
Harga bahan:
- Semen portland kg 10.224 1,521.52 15,556.02
- Pasir pasang m³ 0.020 355,680.00 7,113.60
Jumlah Harga Bahan 22,669.62
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 32,531.89
Jumlah Total 55,201.51
Dibulatkan 55,200.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
2. Plesteran 1 Pc : 3 Ps tebal 15 mm tiap 1m2
Harga bahan:
- Semen portland kg 7.776 1,521.52 11,831.34
- Pasir pasang m³ 0.023 355,680.00 8,180.64
Jumlah Harga Bahan 20,011.98
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 32,531.89
Jumlah Total 52,543.87
Dibulatkan 52,540.00
3. Plesteran 1 Pc : 4 Ps tebal 15 mm tiap 1m2
Harga bahan:
- Semen portland kg 6.240 1,521.52 9,494.28
- Pasir pasang m³ 0.024 355,680.00 8,536.32
Jumlah Harga Bahan 18,030.60
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 32,531.89
Jumlah Total 50,562.49
Dibulatkan 50,560.00
4 Plesteran texture/ Skrit tiap 1 m2
- Plesteran awal m2 1.00000 52,540.00 52,540.00
- Plester dinding sirip m1 20.00000 4,500.00 90,000.00
- Finis Acian dinding sirip m1 20.00000 1,850.00 37,000.00
- cat anti lumut (silicosal) m2 1.00000 53,314.32 53,314.32
- Alat Bantu ls 1.00000 10,000.00 10,000.00
Jumlah Total 242,854.32
Dibulatkan 242,850.00
5. Plesteran 1 Pc : 2 Ps tebal 20 mm tiap 1m2
Harga bahan:
- Semen portland kg 13.632 1,521.52 20,741.36
- Pasir pasang m³ 0.027 355,680.00 9,603.36
Jumlah Harga Bahan 30,344.72
Upah tenaga:
- Pekerja Oh 0.260 63,492.89 16,508.15
- Tukang batu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 34,454.37
Jumlah Total 64,799.10
Dibulatkan 64,790.00
6. Plesteran 1 Pc : 3 Ps tebal 20 mm tiap 1m2
Harga bahan:
- Semen portland kg 10.368 1,521.52 15,775.12
- Pasir pasang m³ 0.031 355,680.00 11,026.08
Jumlah Harga Bahan 26,801.20
Upah tenaga:
- Pekerja Oh 0.260 63,492.89 16,508.15
- Tukang batu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 34,454.37
Jumlah Total 61,255.57
Dibulatkan 61,250.00
7. Plesteran 1 Pc : 4 Ps tebal 20 mm tiap 1m2
Harga bahan:
- Semen portland kg 8.320 1,521.52 12,659.05
- Pasir pasang m³ 0.032 355,680.00 11,381.76
Jumlah Harga Bahan 24,040.81
Upah tenaga:
- Pekerja Oh 0.260 63,492.89 16,508.15
- Tukang batu Oh 0.200 74,788.75 14,957.75
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 34,454.37
Jumlah Total 58,495.18
Dibulatkan 58,490.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
8. Plesteran 1 Pc : 2 Ps tebal 25 mm tiap 1m2
Harga bahan:
- Semen portland kg 15.500 1,521.52 23,583.56
- Pasir pasang m³ 0.013 355,680.00 4,623.84
Jumlah Harga Bahan 28,207.40
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 36,994.09
Jumlah Total 65,201.49
Dibulatkan 65,200.00
9. Plesteran 1 Pc : 3 Ps tebal 25 mm tiap 1m2
Harga bahan:
- Semen portland kg 11.750 1,521.52 17,877.86
- Pasir pasang m³ 0.035 355,680.00 12,448.80
Jumlah Harga Bahan 30,326.66
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 36,994.09
Jumlah Total 67,320.75
Dibulatkan 67,320.00
10. Plesteran 1 Pc : 4 Ps tebal 25 mm tiap 1m2
Harga bahan:
- Semen portland kg 9.480 1,521.52 14,424.01
- Pasir pasang m³ 0.038 355,680.00 13,515.84
Jumlah Harga Bahan 27,939.85
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 36,994.09
Jumlah Total 64,933.94
Dibulatkan 64,930.00
11. Plesteran dinding dengan mortar tiap 1m2
Harga bahan:
- Perekat MU-301 (plesteran) kg 22.000 916.31 20,158.87
Jumlah Harga Bahan 20,158.87
Upah tenaga:
- Pekerja Oh 0.260 63,492.89 16,508.15
- Tukang batu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 29,992.17
Jumlah Total 50,151.05
Dibulatkan 50,150.00
12. Plesteran Berapen 1 Pc : 3 Ps tebal 15 mm tiap 1m2
Harga bahan:
- Semen portland kg 7.070 1,521.52 10,757.15
- Pasir pasang m³ 0.021 355,680.00 7,469.28
Jumlah Harga Bahan 18,226.43
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang batu Oh 0.070 74,788.75 5,235.21
- Kepala tukang Oh 0.007 86,105.63 602.74
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 16,141.18
Jumlah Total 34,367.61
Dibulatkan 34,360.00
13. Plesteran Berapen 1 Pc : 5 Ps tebal 15 mm tiap 1m2
Harga bahan:
- Semen portland kg 5.184 1,521.52 7,887.56
- Pasir pasang m³ 0.026 355,680.00 9,247.68
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Harga Bahan 17,135.24
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang batu Oh 0.070 74,788.75 5,235.21
- Kepala tukang Oh 0.007 86,105.63 602.74
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 16,141.18
Jumlah Total 33,276.42
Dibulatkan 33,270.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
14. Plesteran Skoning (benangan/ tali air) 1 Pc : 2 Ps lebar 10 cm / tiap 1m'
Harga bahan:
- Semen portland kg 0.500 1,521.52 760.76
- Pasir pasang m³ 0.013 355,680.00 4,623.84
Jumlah Harga Bahan 5,384.60
Upah tenaga:
- Pekerja Oh 0.057 63,492.89 3,619.09
- Tukang batu Oh 0.038 74,788.75 2,841.97
- Kepala tukang Oh 0.038 86,105.63 3,272.01
- Mandor Oh 0.003 97,412.42 292.24
Jumlah Upah Tenaga 10,025.32
Jumlah Total 15,409.92
Dibulatkan 15,400.00
15. Plesteran Ciprat 1 Pc : 2 Ps tiap 1m2
Harga bahan:
- Semen portland kg 4.320 1,521.52 6,572.97
- Pasir pasang m³ 0.006 355,680.00 2,134.08
Jumlah Harga Bahan 8,707.05
Upah tenaga:
- Pekerja Oh 0.250 63,492.89 15,873.22
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 25,479.51
Jumlah Total 34,186.56
Dibulatkan 34,180.00
16. Plesteran Siar 1 Pc : 2 Ps untuk pasangan batu kali tiap 1m2
Harga bahan:
- Semen portland kg 6.340 1,521.52 9,646.44
- Pasir pasang m³ 0.012 355,680.00 4,268.16
Jumlah Harga Bahan 13,914.60
Upah tenaga:
- Pekerja Oh 0.300 63,492.89 19,047.87
- Tukang batu Oh 0.140 74,788.75 10,470.43
- Kepala tukang Oh 0.014 86,105.63 1,205.48
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 32,184.96
Jumlah Total 46,099.55
Dibulatkan 46,090.00
17. Acian 1 m2
Harga bahan:
- Semen portland kg 3.250 1,521.52 4,944.94
Jumlah Harga Bahan 4,944.94
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 18,643.16
Jumlah Total 23,588.10
Dibulatkan 23,580.00
18 Acian dengan mortar tiap 1m2
Harga bahan:
- Perekat MU-200 (acian) kg 3.000 3,257.53 9,772.60
Jumlah Harga Bahan 9,772.60
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 18,643.16
Jumlah Total 28,415.76
Dibulatkan 28,410.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Paku biasa 2"-5" kg 1.250 20,748.00 25,935.00
- Lem kayu kg 1.000 22,988.34 22,988.34
Jumlah Harga Bahan 46,284,873.10
Upah tenaga:
- Pekerja Oh 6.000 63,492.89 380,957.33
- Tukang kayu Oh 20.000 74,788.75 1,495,775.01
- Kepala tukang Oh 2.000 86,105.63 172,211.26
- Mandor Oh 0.300 97,412.42 29,223.73
Jumlah Upah Tenaga 2,078,167.32
Jumlah Total 48,363,040.42
Dibulatkan 48,363,040.00
2. Pasang kusen pintu dan jendela Kayu Kamper Samarinda Oven tiap 1m3
Harga bahan:
- Kayu Kamper Samarinda Oven balok m³ 1.200 6,960,926.34 8,353,111.60
- Paku biasa 2"-5" kg 1.250 20,748.00 25,935.00
- Lem kayu kg 1.000 22,988.34 22,988.34
Jumlah Harga Bahan 8,402,034.94
Upah tenaga:
- Pekerja Oh 6.000 63,492.89 380,957.33
- Tukang kayu Oh 18.000 74,788.75 1,346,197.51
- Kepala tukang Oh 2.000 86,105.63 172,211.26
- Mandor Oh 0.300 97,412.42 29,223.73
Jumlah Upah Tenaga 1,928,589.82
Jumlah Total 10,330,624.76
Dibulatkan 10,330,620.00
3. Pasang kusen pintu dan jendela Kayu Kamper Medan/Kruing tiap 1m3
Harga bahan:
- Kayu Kamper Medan/Kruing balok m³ 1.200 4,791,725.70 5,750,070.84
- Paku biasa 2"-5" kg 1.250 20,748.00 25,935.00
- Lem kayu kg 1.000 22,988.34 22,988.34
Jumlah Harga Bahan 5,798,994.18
Upah tenaga:
- Pekerja Oh 6.000 63,492.89 380,957.33
- Tukang kayu Oh 18.000 74,788.75 1,346,197.51
- Kepala tukang Oh 2.000 86,105.63 172,211.26
- Mandor Oh 0.300 97,412.42 29,223.73
Jumlah Upah Tenaga 1,928,589.82
Jumlah Total 7,727,584.00
Dibulatkan 7,727,580.00
4. Pasang kusen pintu dan jendela Kayu Meranti Palembang tiap 1m3
Harga bahan:
- Kayu Meranti Palembang balok m³ 1.200 4,347,200.00 5,216,640.00
- Paku biasa 2"-5" kg 1.250 20,748.00 25,935.00
- Lem kayu kg 1.000 22,988.34 22,988.34
Jumlah Harga Bahan 5,265,563.34
Upah tenaga:
- Pekerja Oh 6.000 63,492.89 380,957.33
- Tukang kayu Oh 18.000 74,788.75 1,346,197.51
- Kepala tukang Oh 2.000 86,105.63 172,211.26
- Mandor Oh 0.300 97,412.42 29,223.73
Jumlah Upah Tenaga 1,928,589.82
Jumlah Total 7,194,153.16
Dibulatkan 7,194,150.00
5. Pasang kusen pintu dan jendela Kayu Borneo tiap 1m3
Harga bahan:
- Kayu Borneo balok m³ 1.200 2,900,255.03 3,480,306.04
- Paku biasa 2"-5" kg 1.250 20,748.00 25,935.00
- Lem kayu kg 1.000 22,988.34 22,988.34
Jumlah Harga Bahan 3,529,229.38
Upah tenaga:
- Pekerja Oh 6.000 63,492.89 380,957.33
- Tukang kayu Oh 18.000 74,788.75 1,346,197.51
- Kepala tukang Oh 2.000 86,105.63 172,211.26
- Mandor Oh 0.300 97,412.42 29,223.73
Jumlah Upah Tenaga 1,928,589.82
Jumlah Total 5,457,819.20
Dibulatkan 5,457,810.00
6. Pasang pintu panel Kayu Jati tiap 1m2
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Harga bahan:
- Kayu Jati papan m³ 0.040 42,032,681.60 1,681,307.26
- Lem kayu kg 0.500 22,988.34 11,494.17
Jumlah Harga Bahan 1,692,801.43
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 2.500 74,788.75 186,971.88
- Kepala tukang Oh 0.250 86,105.63 21,526.41
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 276,861.79
Jumlah Total 1,969,663.23
Dibulatkan 1,969,660.00
7. Pasang pintu panel Kayu Kamper Samarinda Oven tiap 1m2
Harga bahan:
- Kayu Kamper Samarinda Oven papan m³ 0.040 7,129,057.06 285,162.28
- Lem kayu kg 0.500 22,988.34 11,494.17
Jumlah Harga Bahan 296,656.45
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 2.500 74,788.75 186,971.88
- Kepala tukang Oh 0.250 86,105.63 21,526.41
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 276,861.79
Jumlah Total 573,518.25
Dibulatkan 573,510.00
8. Pasang pintu panel Kayu Kamper Medan/Kruing tiap 1m2
Harga bahan:
- Kayu Kamper Medan/Kruing papan m³ 0.040 6,893,359.78 275,734.39
- Lem kayu kg 0.500 22,988.34 11,494.17
Jumlah Harga Bahan 287,228.56
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 2.500 74,788.75 186,971.88
- Kepala tukang Oh 0.250 86,105.63 21,526.41
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 276,861.79
Jumlah Total 564,090.35
Dibulatkan 564,090.00
9. Pasang pintu panel Kayu Borneo tiap 1m2
Harga bahan:
- Kayu Borneo papan 3 cm m³ 0.040 3,068,385.76 122,735.43
- Lem kayu kg 0.500 22,988.34 11,494.17
Jumlah Harga Bahan 134,229.60
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 2.500 74,788.75 186,971.88
- Kepala tukang Oh 0.250 86,105.63 21,526.41
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 276,861.79
Jumlah Total 411,091.39
Dibulatkan 411,090.00
10. Pasang pintu panel Kayu Meranti Sampit tiap 1m2
Harga bahan:
- Kayu Meranti Sampit papan m³ 0.040 5,434,000.00 217,360.00
- Lem kayu kg 0.500 22,988.34 11,494.17
Jumlah Harga Bahan 228,854.17
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 2.500 74,788.75 186,971.88
- Kepala tukang Oh 0.250 86,105.63 21,526.41
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 276,861.79
Jumlah Total 505,715.96
Dibulatkan 505,710.00
11. Pasang pintu dan jendela kaca Kayu Jati tiap 1m2
Harga bahan:
- Kayu Jati papan m³ 0.024 42,032,681.60 1,008,784.36
- Lem kayu kg 0.300 22,988.34 6,896.50
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Harga Bahan 1,015,680.86
Upah tenaga:
- Pekerja Oh 0.800 63,492.89 50,794.31
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 221,489.43
Jumlah Total 1,237,170.29
Dibulatkan 1,237,170.00
12. Pasang pintu dan jendela kaca Kayu Kamper Samarinda Oven tiap 1m2
Harga bahan:
- Kayu Kamper Samarinda Oven papan m³ 0.024 7,129,057.06 171,097.37
- Lem kayu kg 0.300 22,988.34 6,896.50
Jumlah Harga Bahan 177,993.87
Upah tenaga:
- Pekerja Oh 0.800 63,492.89 50,794.31
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 221,489.43
Jumlah Total 399,483.31
Dibulatkan 399,480.00
13. Pasang pintu dan jendela kaca Kayu Kamper Medan/Kruing tiap 1m2
Harga bahan:
- Kayu Kamper Medan/Kruing papan m³ 0.024 6,893,359.78 165,440.63
- Lem kayu kg 0.300 22,988.34 6,896.50
Jumlah Harga Bahan 172,337.14
Upah tenaga:
- Pekerja Oh 0.800 63,492.89 50,794.31
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 221,489.43
Jumlah Total 393,826.57
Dibulatkan 393,820.00
14. Pasang pintu dan jendela kaca Kayu Meranti Sampit tiap 1m2
Harga bahan:
- Kayu Meranti Sampit papan m³ 0.024 5,434,000.00 130,416.00
- Lem kayu kg 0.300 22,988.34 6,896.50
Jumlah Harga Bahan 137,312.50
Upah tenaga:
- Pekerja Oh 0.800 63,492.89 50,794.31
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 221,489.43
Jumlah Total 358,801.94
Dibulatkan 358,800.00
15. Pasang pintu dan jendela kaca Kayu Borneo tiap 1m2
Harga bahan:
- Kayu Borneo papan 3 cm m³ 0.024 3,068,385.76 73,641.26
- Lem kayu kg 0.300 22,988.34 6,896.50
Jumlah Harga Bahan 80,537.76
Upah tenaga:
- Pekerja Oh 0.800 63,492.89 50,794.31
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 221,489.43
Jumlah Total 302,027.19
Dibulatkan 302,020.00
16. Pasang pintu dan jendela jalusi Kayu Jati tiap 1m2
Harga bahan:
- Kayu Jati papan m³ 0.064 42,032,681.60 2,690,091.62
- Lem kayu kg 0.500 22,988.34 11,494.17
Jumlah Harga Bahan 2,701,585.79
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Tukang kayu Oh 3.000 74,788.75 224,366.25
- Kepala tukang Oh 0.300 86,105.63 25,831.69
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 318,561.45
Jumlah Total 3,020,147.24
Dibulatkan 3,020,140.00
17. Pasang pintu dan jendela jalusi Kayu Kamper Samarinda Oven tiap 1m2
Harga bahan:
- Kayu Kamper Samarinda Oven papan m³ 0.064 7,129,057.06 456,259.65
- Lem kayu kg 0.500 22,988.34 11,494.17
Jumlah Harga Bahan 467,753.82
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 3.000 74,788.75 224,366.25
- Kepala tukang Oh 0.300 86,105.63 25,831.69
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 318,561.45
Jumlah Total 786,315.27
Dibulatkan 786,310.00
18. Pasang pintu dan jendela jalusi Kayu Kamper Singkil tiap 1m2
Harga bahan:
- Kayu Kamper Singkil papan m³ 0.064 5,329,845.38 341,110.10
- Lem kayu kg 0.500 22,988.34 11,494.17
Jumlah Harga Bahan 352,604.27
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 3.000 74,788.75 224,366.25
- Kepala tukang Oh 0.300 86,105.63 25,831.69
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 318,561.45
Jumlah Total 671,165.72
Dibulatkan 671,160.00
19. Pasang pintu dan jendela jalusi Kayu Kamper Medan/Kruing tiap 1m2
Harga bahan:
- Kayu Kamper Medan/Kruing papan m³ 0.064 6,893,359.78 441,175.03
- Lem kayu kg 0.500 22,988.34 11,494.17
Jumlah Harga Bahan 452,669.20
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 3.000 74,788.75 224,366.25
- Kepala tukang Oh 0.300 86,105.63 25,831.69
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 318,561.45
Jumlah Total 771,230.65
Dibulatkan 771,230.00
20. Pasang pintu dan jendela jalusi Kayu Meranti Sampit tiap 1m2
Harga bahan:
- Kayu Meranti Sampit papan m³ 0.064 5,434,000.00 347,776.00
- Lem kayu kg 0.500 22,988.34 11,494.17
Jumlah Harga Bahan 359,270.17
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 3.000 74,788.75 224,366.25
- Kepala tukang Oh 0.300 86,105.63 25,831.69
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 318,561.45
Jumlah Total 677,831.62
Dibulatkan 677,830.00
21. Pasang pintu dan jendela jalusi Kayu Borneo tiap 1m2
Harga bahan:
- Kayu Borneo papan 3 cm m³ 0.064 3,068,385.76 196,376.69
- Lem kayu kg 0.500 22,988.34 11,494.17
Jumlah Harga Bahan 207,870.86
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 3.000 74,788.75 224,366.25
- Kepala tukang Oh 0.300 86,105.63 25,831.69
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 318,561.45
Jumlah Total 526,432.31
Dibulatkan 526,430.00
22. Pasang jalusi mati Kayu Jati tiap 1m2
Harga bahan:
- Kayu Jati papan m³ 0.060 42,032,681.60 2,521,960.90
- Paku biasa 1/2"- 1" kg 0.150 25,688.00 3,853.20
Jumlah Harga Bahan 2,525,814.10
- Pekerja Oh 0.500 63,492.89 31,746.44
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.025 97,412.42 2,435.31
Jumlah Upah Tenaga 200,980.38
Jumlah Total 2,726,794.48
Dibulatkan 2,726,790.00
23. Pasang jalusi mati Kayu Kamper Samarinda oven tiap 1m2
Harga bahan:
- Kayu Kamper Samarinda oven papan m³ 0.060 7,129,057.06 427,743.42
- Paku biasa 1/2"- 1" kg 0.150 25,688.00 3,853.20
Jumlah Harga Bahan 431,596.62
Upah tenaga:
- Pekerja Oh 0.500 63,492.89 31,746.44
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.025 97,412.42 2,435.31
Jumlah Upah Tenaga 200,980.38
Jumlah Total 632,577.00
Dibulatkan 632,570.00
24. Pasang jalusi mati Kayu Kamper Medan/Kruing tiap 1m2
Harga bahan:
- Kayu Kamper Medan/Kruing papan m³ 0.060 6,893,359.78 413,601.59
- Paku biasa 1/2"- 1" kg 0.150 25,688.00 3,853.20
Jumlah Harga Bahan 417,454.79
Upah tenaga:
- Pekerja Oh 0.500 63,492.89 31,746.44
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.025 97,412.42 2,435.31
Jumlah Upah Tenaga 200,980.38
Jumlah Total 618,435.17
Dibulatkan 618,430.00
25. Pasang pintu teakwood rangkap, rangka Kayu Kamper Samarinda oven tiap 1m2
Harga bahan:
- Kayu Kamper Samarinda oven papan m³ 0.025 7,129,057.06 178,226.43
- Paku biasa 1/2"- 1" kg 0.030 25,688.00 770.64
- Lem kayu lt 0.500 22,988.34 11,494.17
- Teakwood 4x8 ft 3 mm lbr 1.000 102,752.00 102,752.00
Jumlah Harga Bahan 293,243.24
Upah tenaga:
- Pekerja Oh 0.600 63,492.89 38,095.73
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 207,816.73
Jumlah Total 501,059.97
Dibulatkan 501,050.00
26. Pasang pintu teakwood rangkap, rangka Kayu Kamper Medan/Kruing tiap 1m2
Harga bahan:
- Kayu Kamper Medan/Kruing papan m³ 0.025 6,893,359.78 172,333.99
- Paku biasa 1/2"- 1" kg 0.030 25,688.00 770.64
- Lem kayu lt 0.500 22,988.34 11,494.17
- Teakwood 4x8 ft 3 mm lbr 1.000 102,752.00 102,752.00
Jumlah Harga Bahan 287,350.81
Upah tenaga:
- Pekerja Oh 0.600 63,492.89 38,095.73
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 207,816.73
Jumlah Total 495,167.54
Dibulatkan 495,160.00
27. Pasang pintu teakwood rangkap, rangka Kayu Meranti Palembang tiap 1m2
Harga bahan:
- Kayu Meranti Palembang papan m³ 0.025 5,434,000.00 135,850.00
- Paku biasa 1/2"- 1" kg 0.030 25,688.00 770.64
- Lem kayu lt 0.500 22,988.34 11,494.17
- Teakwood 4x8 ft 3 mm lbr 1.000 102,752.00 102,752.00
Jumlah Harga Bahan 250,866.81
Upah tenaga:
- Pekerja Oh 0.600 63,492.89 38,095.73
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 207,816.73
Jumlah Total 458,683.54
Dibulatkan 458,680.00
28. Pasang pintu triplek rangkap, rangka Kayu Kamper Medan/Kruing tiap 1m2
Harga bahan:
- Kayu Kamper Medan/Kruing papan m³ 0.025 6,893,359.78 172,333.99
- Paku biasa 1/2"- 1" kg 0.030 25,688.00 770.64
- Lem kayu lt 0.500 22,988.34 11,494.17
- Triplek 4x8 ft 4 mm lbr 1.000 145,236.00 145,236.00
Jumlah Harga Bahan 329,834.81
Upah tenaga:
- Pekerja Oh 0.600 63,492.89 38,095.73
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 207,816.73
Jumlah Total 537,651.54
Dibulatkan 537,650.00
29. Pasang pintu triplek rangkap, rangka Kayu Meranti Palembang tiap 1m2
Harga bahan:
- Kayu Meranti Palembang papan m³ 0.025 5,434,000.00 135,850.00
- Paku biasa 1/2"- 1" kg 0.030 25,688.00 770.64
- Lem kayu lt 0.500 22,988.34 11,494.17
- Triplek 4x8 ft 4 mm lbr 1.000 145,236.00 145,236.00
Jumlah Harga Bahan 293,350.81
Upah tenaga:
- Pekerja Oh 0.600 63,492.89 38,095.73
- Tukang kayu Oh 2.000 74,788.75 149,577.50
- Kepala tukang Oh 0.200 86,105.63 17,221.13
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 207,816.73
Jumlah Total 501,167.54
Dibulatkan 501,160.00
30. Pasang pintu teakwood dan formika, rangka Kayu Kamper Samarinda oven tiap 1m2
Harga bahan:
- Kayu Kamper Samarinda oven papan m³ 0.025 7,129,057.06 178,226.43
- Paku biasa 1/2"- 1" kg 0.300 25,688.00 7,706.40
- Lem kayu lt 0.800 22,988.34 18,390.67
- Teakwood 4x8 ft 3 mm lbr 1.000 102,752.00 102,752.00
- Formika 3x7 ft lbr 0.500 100,810.87 50,405.43
Jumlah Harga Bahan 357,480.93
Upah tenaga:
- Pekerja Oh 0.800 63,492.89 50,794.31
- Tukang kayu Oh 2.500 74,788.75 186,971.88
- Kepala tukang Oh 0.250 86,105.63 21,526.41
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 263,189.09
Jumlah Total 620,670.02
Dibulatkan 620,670.00
31. Pasang pintu teakwood dan formika, rangka Kayu Kamper Medan/Kruing tiap 1m2
Harga bahan:
- Kayu Kamper Medan/Kruing papan m³ 0.025 6,893,359.78 172,333.99
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Paku biasa 1/2"- 1" kg 0.300 25,688.00 7,706.40
- Lem kayu lt 0.800 22,988.34 18,390.67
- Teakwood 4x8 ft 3 mm lbr 1.000 102,752.00 102,752.00
- Formika 3x7 ft lbr 0.500 100,810.87 50,405.43
Jumlah Harga Bahan 351,588.50
Upah tenaga:
- Pekerja Oh 0.800 63,492.89 50,794.31
- Tukang kayu Oh 2.500 74,788.75 186,971.88
- Kepala tukang Oh 0.250 86,105.63 21,526.41
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 263,189.09
Jumlah Total 614,777.59
Dibulatkan 614,770.00
32. Pasang pintu teakwood dan formika, rangka Kayu Meranti Palembang tiap 1m2
Harga bahan:
- Kayu Meranti Palembang papan m³ 0.025 5,434,000.00 135,850.00
- Paku biasa 1/2"- 1" kg 0.300 25,688.00 7,706.40
- Lem kayu lt 0.800 22,988.34 18,390.67
- Teakwood 4x8 ft 3 mm lbr 1.000 102,752.00 102,752.00
- Formika 3x7 ft lbr 0.500 100,810.87 50,405.43
Jumlah Harga Bahan 315,104.51
Upah tenaga:
- Pekerja Oh 0.800 63,492.89 50,794.31
- Tukang kayu Oh 2.500 74,788.75 186,971.88
- Kepala tukang Oh 0.250 86,105.63 21,526.41
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 263,189.09
Jumlah Total 578,293.60
Dibulatkan 578,290.00
33. Pasang pintu triplek dan formika, rangka Kayu Kamper Medan/Kruing tiap 1m2
Harga bahan:
- Kayu Kamper Medan/Kruing papan m³ 0.025 6,893,359.78 172,333.99
- Paku biasa 1/2"- 1" kg 0.300 25,688.00 7,706.40
- Lem kayu lt 0.800 22,988.34 18,390.67
- Triplek 4x8 ft 4 mm lbr 1.000 145,236.00 145,236.00
- Formika 3x7 ft lbr 0.500 100,810.87 50,405.43
Jumlah Harga Bahan 394,072.50
Upah tenaga:
- Pekerja Oh 0.800 63,492.89 50,794.31
- Tukang kayu Oh 2.500 74,788.75 186,971.88
- Kepala tukang Oh 0.250 86,105.63 21,526.41
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 263,189.09
Jumlah Total 657,261.59
Dibulatkan 657,260.00
34. Pasang pintu triplek dan formika, rangka Kayu Meranti Palembang tiap 1m2
Harga bahan:
- Kayu Meranti Palembang papan m³ 0.025 5,434,000.00 135,850.00
- Paku biasa 1/2"- 1" kg 0.300 25,688.00 7,706.40
- Lem kayu lt 0.800 22,988.34 18,390.67
- Triplek 4x8 ft 4 mm lbr 1.000 145,236.00 145,236.00
- Formika 3x7 ft lbr 0.500 100,810.87 50,405.43
Jumlah Harga Bahan 357,588.51
- Pekerja Oh 0.800 63,492.89 50,794.31
- Tukang kayu Oh 2.500 74,788.75 186,971.88
- Kepala tukang Oh 0.250 86,105.63 21,526.41
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 263,189.09
Jumlah Total 620,777.60
Dibulatkan 620,770.00
35. Pasang pintu triplek dan double formika, rangka Kayu Meranti Palembang tiap 1m2
Harga bahan:
- Kayu Meranti Palembang papan m³ 0.025 5,434,000.00 135,850.00
- Paku biasa 1/2"- 1" kg 0.300 25,688.00 7,706.40
- Lem kayu lt 1.200 22,988.34 27,586.01
- Triplek 4x8 ft 4 mm lbr 1.000 145,236.00 145,236.00
- Formika 3x7 ft lbr 1.000 100,810.87 100,810.87
Jumlah Harga Bahan 417,189.28
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang kayu Oh 2.600 74,788.75 194,450.75
- Kepala tukang Oh 0.260 86,105.63 22,387.46
- Mandor Oh 0.050 97,412.42 4,870.62
Jumlah Upah Tenaga 285,201.72
Jumlah Total 702,391.00
Dibulatkan 702,390.00
36. Pasang kawat harmonika tiap 1 m2
Harga bahan:
- Kawat harmonika m² 1.100 9,037.03 9,940.73
- Paku biasa 1/2"- 1" kg 0.020 25,688.00 513.76
- Kayu Kamper Medan/Kruing papan m3 0.002 6,893,359.78 12,408.05
Jumlah Harga Bahan 22,862.54
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.001 97,412.42 48.71
Jumlah Upah Tenaga 14,737.93
Jumlah Total 37,600.46
Dibulatkan 37,600.00
37. Pasang kawat nyamuk tiap 1 m2
Harga bahan:
- Kawat nyamuk m² 1.100 12,609.80 13,870.78
- Paku biasa 1/2"- 1" kg 0.020 25,688.00 513.76
- Kayu Kamper Medan/Kruing papan m3 0.002 6,893,359.78 12,408.05
Jumlah Harga Bahan 26,792.59
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.001 97,412.42 48.71
Jumlah Upah Tenaga 14,737.93
Jumlah Total 41,530.52
Dibulatkan 41,530.00
38. Pasang kawat kasa tiap 1 m2
Harga bahan:
- Kawat kasa (parabola) m² 1.100 21,497.16 23,646.88
- Paku biasa 1/2"- 1" kg 0.020 25,688.00 513.76
- Kayu Kamper Medan/Kruing papan m3 0.002 6,893,359.78 12,408.05
Jumlah Harga Bahan 36,568.69
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.001 97,412.42 48.71
Jumlah Upah Tenaga 14,737.93
Jumlah Total 51,306.61
Dibulatkan 51,300.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Kayu Borneo balok m³ 1.100 2,900,255.03 3,190,280.53
- Besi pelat strip kg 15.000 10,789.79 161,846.84
- Paku biasa 2"-5" kg 5.600 20,748.00 116,188.80
Jumlah Harga Bahan 3,468,316.17
Upah tenaga:
- Pekerja Oh 4.000 63,492.89 253,971.55
- Tukang kayu Oh 12.000 74,788.75 897,465.00
- Kepala tukang Oh 1.200 86,105.63 103,326.76
- Mandor Oh 0.200 97,412.42 19,482.48
Jumlah Upah Tenaga 1,274,245.79
Jumlah Total 4,742,561.97
Dibulatkan 4,742,560.00
3. Pasang konstruksi kuda-kuda Kayu Kamper Medan/Kruing tiap 1m3
Harga bahan:
- Kayu Kamper Medan/Kruing balok m³ 1.100 4,791,725.70 5,270,898.27
- Besi pelat strip kg 15.000 10,789.79 161,846.84
- Paku biasa 2"-5" kg 5.600 20,748.00 116,188.80
Jumlah Harga Bahan 5,548,933.91
Upah tenaga:
- Pekerja Oh 4.000 63,492.89 253,971.55
- Tukang kayu Oh 12.000 74,788.75 897,465.00
- Kepala tukang Oh 1.200 86,105.63 103,326.76
- Mandor Oh 0.200 97,412.42 19,482.48
Jumlah Upah Tenaga 1,274,245.79
Jumlah Total 6,823,179.71
Dibulatkan 6,823,170.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
7. Pasang kaso + reng genteng kodok Kayu Meranti Jambi tiap 1m²
Harga bahan:
- Kayu Meranti Jambi kaso m³ 0.014 4,347,200.00 60,860.80
- Kayu Meranti Jambi reng m³ 0.004 4,347,200.00 15,649.92
- Paku biasa 2"-5" kg 0.250 20,748.00 5,187.00
Jumlah Harga Bahan 81,697.72
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 15,176.28
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Total 96,874.00
Dibulatkan 96,870.00
8. Pasang kaso + reng genteng keramik Kayu Kamper Medan/Kruing tiap 1m²
Harga bahan:
- Kayu Kamper Medan/Kruing kaso m³ 0.014 6,473,032.97 90,622.46
- Kayu Kamper Medan/Kruing reng m³ 0.004 4,623,594.98 16,644.94
- Paku biasa 2"-5" kg 0.250 20,748.00 5,187.00
Jumlah Harga Bahan 112,454.40
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 15,176.28
Jumlah Total 127,630.69
Dibulatkan 127,630.00
9. Pasang kaso + reng genteng keramik Kayu Meranti Jambi tiap 1m²
Harga bahan:
- Kayu Meranti Jambi kaso m³ 0.014 4,347,200.00 60,860.80
- Kayu Meranti Jambi reng m³ 0.004 4,347,200.00 15,649.92
- Paku biasa 2"-5" kg 0.250 20,748.00 5,187.00
Jumlah Harga Bahan 81,697.72
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 15,176.28
Jumlah Total 96,874.00
Dibulatkan 96,870.00
10. Pasang kaso + reng genteng beton Kayu Kamper Medan/Kruing tiap 1m²
Harga bahan:
- Kayu Kamper Medan/Kruing kaso m³ 0.014 6,473,032.97 90,622.46
- Kayu Kamper Medan/Kruing reng m³ 0.006 4,623,594.98 26,354.49
- Paku biasa 2"-5" kg 0.250 20,748.00 5,187.00
Jumlah Harga Bahan 122,163.95
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 15,176.28
Jumlah Total 137,340.24
Dibulatkan 137,340.00
11. Pasang kaso + reng genteng beton Kayu Meranti Jambi tiap 1m²
Harga bahan:
- Kayu Meranti Jambi kaso m³ 0.014 4,347,200.00 60,860.80
- Kayu Meranti Jambi reng m³ 0.006 4,347,200.00 24,779.04
- Paku biasa 2"-5" kg 0.250 20,748.00 5,187.00
Jumlah Harga Bahan 90,826.84
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 15,176.28
Jumlah Total 106,003.12
Dibulatkan 106,000.00
12. Pasang kaso + reng atap sirap kayu kamper tiap 1m²
Harga bahan:
- Kayu Kamper Samarinda kaso m³ 0.165 6,473,032.97 1,068,050.44
- Paku biasa 2"-5" kg 0.200 20,748.00 4,149.60
Jumlah Harga Bahan 1,072,200.04
Upah tenaga:
- Pekerja Oh 0.120 63,492.89 7,619.15
- Tukang kayu Oh 0.120 74,788.75 8,974.65
- Kepala tukang Oh 0.012 86,105.63 1,033.27
- Mandor Oh 0.006 97,412.42 584.47
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Upah Tenaga 18,211.54
Jumlah Total 1,090,411.58
Dibulatkan 1,090,410.00
13. Pasang lisplank (3 x 20) cm Kayu Kamper Samarinda tiap 1m'
Harga bahan:
- Kayu Kamper Samarinda papan m³ 0.007 6,893,359.78 49,632.19
- Paku biasa 2"-5" kg 0.050 20,748.00 1,037.40
Jumlah Harga Bahan 50,669.59
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 23,516.21
Jumlah Total 74,185.80
Dibulatkan 74,180.00
14. Pasang lisplank (3 x 20) cm Kayu Kamper Medan/Kruing tiap 1m'
Harga bahan:
- Kayu Kamper Medan/Kruing papan m³ 0.007 6,893,359.78 49,632.19
- Paku biasa 2"-5" kg 0.050 20,748.00 1,037.40
Jumlah Harga Bahan 50,669.59
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 23,516.21
Jumlah Total 74,185.80
Dibulatkan 74,180.00
15. Pasang lisplank (3 x 20) cm Kayu Meranti Palembang tiap 1m'
Harga bahan:
- Kayu Meranti Palembang papan m³ 0.007 5,434,000.00 39,124.80
- Paku biasa 2"-5" kg 0.050 20,748.00 1,037.40
Jumlah Harga Bahan 40,162.20
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 23,516.21
Jumlah Total 63,678.41
Dibulatkan 63,670.00
16. Pasang lisplank (3 x 30) cm Kayu Kamper Samarinda tiap 1m'
Harga bahan:
- Kayu Kamper Samarinda papan m³ 0.011 6,893,359.78 75,826.96
- Paku biasa 2"-5" kg 0.050 20,748.00 1,037.40
Jumlah Harga Bahan 76,864.36
Upah tenaga:
- Pekerja Oh 0.110 63,492.89 6,984.22
- Tukang kayu Oh 0.220 74,788.75 16,453.53
- Kepala tukang Oh 0.022 86,105.63 1,894.32
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 25,819.13
Jumlah Total 102,683.49
Dibulatkan 102,680.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Dibulatkan 102,680.00
18. Pasang lisplank (3 x 30) cm Kayu Meranti Palembang tiap 1m'
Harga bahan:
- Kayu Meranti Palembang papan m³ 0.011 5,434,000.00 59,774.00
- Paku biasa 2"-5" kg 0.050 20,748.00 1,037.40
Jumlah Harga Bahan 60,811.40
Upah tenaga:
- Pekerja Oh 0.110 63,492.89 6,984.22
- Tukang kayu Oh 0.220 74,788.75 16,453.53
- Kepala tukang Oh 0.022 86,105.63 1,894.32
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 25,819.13
Jumlah Total 86,630.53
Dibulatkan 86,630.00
19. Pasang lisplank 2 x (2 x 20) cm Kayu Kamper Samarinda tiap 1m'
Harga bahan:
- Kayu Kamper Samarinda papan m³ 0.009 6,893,359.78 60,661.57
- Paku biasa 2"-5" kg 0.060 20,748.00 1,244.88
Jumlah Harga Bahan 61,906.45
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 15,176.28
Jumlah Total 77,082.73
Dibulatkan 77,080.00
20. Pasang lisplank 2 x (2 x 20) cm Kayu Kamper Medan/Kruing tiap 1m'
Harga bahan:
- Kayu Kamper Medan/Kruing papan m³ 0.009 6,893,359.78 60,661.57
- Paku biasa 2"-5" kg 0.060 20,748.00 1,244.88
Jumlah Harga Bahan 61,906.45
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 15,176.28
Jumlah Total 77,082.73
Dibulatkan 77,080.00
21. Pasang lisplank 2 x (2 x 20) cm Kayu Meranti Palembang tiap 1m'
Harga bahan:
- Kayu Meranti Palembang papan m³ 0.009 5,434,000.00 47,819.20
- Paku biasa 2"-5" kg 0.060 20,748.00 1,244.88
Jumlah Harga Bahan 49,064.08
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 15,176.28
Jumlah Total 64,240.36
Dibulatkan 64,240.00
22. Membuat listplank asbes plat ram kayu tiap 1 m2
Harga bahan:
- Kayu Kamper Medan/Kruing reng m³ 0.025 4,623,594.98 115,589.87
- Plat asbes 100x100 cm 2,7 mm lbr 1.000 10,060.35 10,060.35
- Paku biasa 1/2"- 1" kg 0.300 25,688.00 7,706.40
Jumlah Harga Bahan 133,356.62
Upah tenaga:
- Pekerja Oh 0.600 63,492.89 38,095.73
- Tukang kayu Oh 1.800 74,788.75 134,619.75
- Kepala tukang Oh 0.180 86,105.63 15,499.01
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 191,136.87
Jumlah Total 324,493.49
Dibulatkan 324,490.00
22. Pasang hollow 40x40 + reng baja ringan tiap 1m²
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Harga bahan:
- Hollow 4x4 cm tbl 0.8 mm ( P = 6 m ) Besi byg 0.500 58,075.81 29,037.90
- Reng baja ringan m 3.000 11,784.86 35,354.59
- paku sekrup kg 0.200 21,069.77 4,213.95
Jumlah Harga Bahan 68,606.45
Upah tenaga:
- Pekerja Oh 0.120 63,492.89 7,619.15
- Tukang kayu Oh 0.120 74,788.75 8,974.65
- Kepala tukang Oh 0.012 86,105.63 1,033.27
- Mandor Oh 0.006 97,412.42 584.47
Jumlah Upah Tenaga 18,211.54
Jumlah Total 86,817.99
Dibulatkan 86,810.00
23 Pasang lisplang GRC t = 10 mm Lebar 300 mm tiap 1m
Harga bahan:
- lisplang GRC t = 10 mm Lebar 300 mm m 1.000 29,462.16 29,462.16
- Paku biasa 2"-5" kg 0.050 20,748.00 1,037.40
Jumlah Harga Bahan 30,499.56
Upah tenaga:
- Pekerja Oh 0.110 63,492.89 6,984.22
- Tukang kayu Oh 0.220 74,788.75 16,453.53
- Kepala tukang Oh 0.022 86,105.63 1,894.32
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 25,819.13
Jumlah Total 56,318.69
Dibulatkan 56,310.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Dibulatkan 85,340.00
4. Pasang rangka plafon (50 x 100) cm Kayu Kamper Samarinda tiap 1m²
Harga bahan:
- Kayu Kamper Samarinda balok m³ 0.015 6,725,229.06 103,568.53
- Paku biasa 2"-5" kg 0.200 20,748.00 4,149.60
Jumlah Harga Bahan 107,718.13
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang kayu Oh 0.250 74,788.75 18,697.19
- Kepala tukang Oh 0.025 86,105.63 2,152.64
- Mandor Oh 0.008 97,412.42 730.59
Jumlah Upah Tenaga 31,104.35
Jumlah Total 138,822.48
Dibulatkan 138,820.00
5. Pasang rangka plafon (50 x 100) cm Kayu Kamper Medan/Kruing tiap 1m²
Harga bahan:
- Kayu Kamper Medan/Kruing balok m³ 0.015 4,791,725.70 73,792.58
- Paku biasa 2"-5" kg 0.200 20,748.00 4,149.60
Jumlah Harga Bahan 77,942.18
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang kayu Oh 0.250 74,788.75 18,697.19
- Kepala tukang Oh 0.025 86,105.63 2,152.64
- Mandor Oh 0.008 97,412.42 730.59
Jumlah Upah Tenaga 31,104.35
Jumlah Total 109,046.53
Dibulatkan 109,040.00
6. Pasang rangka plafon (50 x 100) cm Kayu Meranti Palembang tiap 1m²
Harga bahan:
- Kayu Meranti Palembang balok m³ 0.015 4,347,200.00 66,946.88
- Paku biasa 2"-5" kg 0.200 20,748.00 4,149.60
Jumlah Harga Bahan 71,096.48
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang kayu Oh 0.250 74,788.75 18,697.19
- Kepala tukang Oh 0.025 86,105.63 2,152.64
- Mandor Oh 0.008 97,412.42 730.59
Jumlah Upah Tenaga 31,104.35
Jumlah Total 102,200.83
Dibulatkan 102,200.00
7. Pasang rangka plafon (60 x 120) cm Kayu Kamper Samarinda tiap 1m²
Harga bahan:
- Kayu Kamper Samarinda balok m³ 0.013 6,725,229.06 87,427.98
- Paku biasa 2"-5" kg 0.100 20,748.00 2,074.80
Jumlah Harga Bahan 89,502.78
Upah tenaga:
- Pekerja Oh 0.160 63,492.89 10,158.86
- Tukang kayu Oh 0.260 74,788.75 19,445.08
- Kepala tukang Oh 0.026 86,105.63 2,238.75
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 32,621.98
Jumlah Total 122,124.76
Dibulatkan 122,120.00
8. Pasang rangka plafon (60 x 120) cm Kayu Kamper Medan/Kruing tiap 1m²
Harga bahan:
- Kayu Kamper Medan/Kruing balok m³ 0.013 4,791,725.70 62,292.43
- Paku biasa 2"-5" kg 0.100 20,748.00 2,074.80
Jumlah Harga Bahan 64,367.23
Upah tenaga:
- Pekerja Oh 0.160 63,492.89 10,158.86
- Tukang kayu Oh 0.260 74,788.75 19,445.08
- Kepala tukang Oh 0.026 86,105.63 2,238.75
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 32,621.98
Jumlah Total 96,989.22
Dibulatkan 96,980.00
9. Pasang rangka plafon (60 x 120) cm Kayu Meranti Palembang tiap 1m²
Harga bahan:
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Kayu Meranti Palembang balok m³ 0.013 4,347,200.00 56,513.60
- Paku biasa 2"-5" kg 0.100 20,748.00 2,074.80
Jumlah Harga Bahan 58,588.40
Upah tenaga:
- Pekerja Oh 0.160 63,492.89 10,158.86
- Tukang kayu Oh 0.260 74,788.75 19,445.08
- Kepala tukang Oh 0.026 86,105.63 2,238.75
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 32,621.98
Jumlah Total 91,210.38
Dibulatkan 91,210.00
10. Pasang rangka plafon (60 x 60) cm Kayu Kamper Samarinda tiap 1m²
Harga bahan:
- Kayu Kamper Samarinda balok m³ 0.016 6,725,229.06 109,621.23
- Paku biasa 2"-5" kg 0.250 20,748.00 5,187.00
Jumlah Harga Bahan 114,808.23
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.300 74,788.75 22,436.63
- Kepala tukang Oh 0.030 86,105.63 2,583.17
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 38,692.50
Jumlah Total 153,500.73
Dibulatkan 153,500.00
11. Pasang rangka plafon (60 x 60) cm Kayu Kamper Medan/Kruing tiap 1m²
Harga bahan:
- Kayu Kamper Medan/Kruing balok m³ 0.016 4,791,725.70 78,105.13
- Paku biasa 2"-5" kg 0.250 20,748.00 5,187.00
Jumlah Harga Bahan 83,292.13
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.300 74,788.75 22,436.63
- Kepala tukang Oh 0.030 86,105.63 2,583.17
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 38,692.50
Jumlah Total 121,984.62
Dibulatkan 121,980.00
12. Pasang rangka plafon (60 x 60) cm Kayu Meranti Palembang tiap 1m²
Harga bahan:
- Kayu Meranti Palembang balok m³ 0.016 4,347,200.00 70,859.36
- Paku biasa 2"-5" kg 0.250 20,748.00 5,187.00
Jumlah Harga Bahan 76,046.36
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.300 74,788.75 22,436.63
- Kepala tukang Oh 0.030 86,105.63 2,583.17
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 38,692.50
Jumlah Total 114,738.86
Dibulatkan 114,730.00
13. Pasang rangka plafon (30 x 60) cm Kayu Kamper Samarinda tiap 1m²
Harga bahan:
- Kayu Kamper Samarinda balok m³ 0.023 6,725,229.06 154,680.27
- Paku biasa 2"-5" kg 0.150 20,748.00 3,112.20
Jumlah Harga Bahan 157,792.47
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.300 74,788.75 22,436.63
- Kepala tukang Oh 0.030 86,105.63 2,583.17
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 38,692.50
Jumlah Total 196,484.96
Dibulatkan 196,480.00
14. Pasang rangka plafon (30 x 60) cm Kayu Kamper Medan/Kruing tiap 1m²
Harga bahan:
- Kayu Kamper Medan/Kruing balok m³ 0.023 4,791,725.70 110,209.69
- Paku biasa 2"-5" kg 0.150 20,748.00 3,112.20
Jumlah Harga Bahan 113,321.89
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.300 74,788.75 22,436.63
- Kepala tukang Oh 0.030 86,105.63 2,583.17
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 38,692.50
Jumlah Total 152,014.39
Dibulatkan 152,010.00
15. Pasang rangka plafon (30 x 60) cm Kayu Meranti Palembang tiap 1m²
Harga bahan:
- Kayu Meranti Palembang balok m³ 0.023 4,347,200.00 99,985.60
- Paku biasa 2"-5" kg 0.150 20,748.00 3,112.20
Jumlah Harga Bahan 103,097.80
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.300 74,788.75 22,436.63
- Kepala tukang Oh 0.030 86,105.63 2,583.17
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 38,692.50
Jumlah Total 141,790.30
Dibulatkan 141,790.00
16. List Plafon kayu profil tiap 1m'
Harga bahan:
- Kayu list profil m' 1.050 6,515.07 6,840.82
- Paku biasa 1/2"- 1" kg 0.010 25,688.00 256.88
Jumlah Harga Bahan 7,097.70
Upah tenaga:
- Pekerja Oh 0.050 63,492.89 3,174.64
- Tukang kayu Oh 0.050 74,788.75 3,739.44
- Kepala tukang Oh 0.005 86,105.63 430.53
- Mandor Oh 0.003 97,412.42 292.24
Jumlah Upah Tenaga 7,636.85
Jumlah Total 14,734.55
Dibulatkan 14,730.00
17. List plafon bahan Kayu Kamper Samarinda papan 1x5 cm tiap 1 m'
Harga bahan:
- Kayu Kamper Samarinda papan m³ 0.001 6,893,359.78 3,791.35
- Paku biasa 1/2"- 1" kg 0.050 25,688.00 1,284.40
Jumlah Harga Bahan 5,075.75
Upah tenaga:
- Pekerja Oh 0.040 63,492.89 2,539.72
- Tukang kayu Oh 0.120 74,788.75 8,974.65
- Kepala tukang Oh 0.012 86,105.63 1,033.27
- Mandor Oh 0.002 97,412.42 194.82
Jumlah Upah Tenaga 12,742.46
Jumlah Total 17,818.21
Dibulatkan 17,810.00
18. List plafon bahan triplek 0,3x5 cm tiap 1 m'
Harga bahan:
- Triplek 4x8 ft 6 mm lbr 0.022 224,276.00 4,934.07
- Paku biasa 1/2"- 1" kg 0.050 25,688.00 1,284.40
Jumlah Harga Bahan 6,218.47
Upah tenaga:
- Pekerja Oh 0.040 63,492.89 2,539.72
- Tukang kayu Oh 0.120 74,788.75 8,974.65
- Kepala tukang Oh 0.012 86,105.63 1,033.27
- Mandor Oh 0.002 97,412.42 194.82
Jumlah Upah Tenaga 12,742.46
Jumlah Total 18,960.93
Dibulatkan 18,960.00
19. Pasang list profil cornice gypsum lebar sampai 5 cm tiap 1 m'
Harga bahan:
- List profil cornice gypsum lebar sampai 5 cm m' 1.100 9,097.92 10,007.71
- Compound gypsum zak 0.035 59,592.13 2,085.72
- Alkasit kg 0.004 16,105.98 56.37
Jumlah Harga Bahan 12,149.80
Upah tenaga:
- Pekerja Oh 0.113 63,492.89 7,142.95
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Tukang gypsum Oh 0.038 74,788.75 2,804.58
- Kepala tukang Oh 0.004 86,105.63 318.59
- Mandor Oh 0.007 97,412.42 633.18
Jumlah Upah Tenaga 10,899.30
Jumlah Total 23,049.10
Dibulatkan 23,040.00
20. Pasang list profil cornice gypsum lebar sampai 5-10 cm tiap 1 m'
Harga bahan:
- List profil cornice gypsum lebar 5-10 cm m' 1.100 14,291.11 15,720.22
- Compound gypsum zak 0.044 59,592.13 2,607.16
- Alkasit kg 0.004 16,105.98 70.87
Jumlah Harga Bahan 18,398.24
Upah tenaga:
- Pekerja Oh 0.113 63,492.89 7,142.95
- Tukang gypsum Oh 0.038 74,788.75 2,804.58
- Kepala tukang Oh 0.004 86,105.63 318.59
- Mandor Oh 0.007 97,412.42 633.18
Jumlah Upah Tenaga 10,899.30
Jumlah Total 29,297.54
Dibulatkan 29,290.00
21. Pasang list profil cornice gypsum lebar lebih dari 10 cm tiap 1 m'
Harga bahan:
- List profil cornice gypsum lebih dari 10 cm m' 1.100 17,824.21 19,606.64
- Compound gypsum zak 0.053 59,592.13 3,128.59
- Alkasit kg 0.005 16,105.98 85.36
Jumlah Harga Bahan 22,820.58
Upah tenaga:
- Pekerja Oh 0.113 63,492.89 7,142.95
- Tukang gypsum Oh 0.040 74,788.75 2,991.55
- Kepala tukang Oh 0.004 86,105.63 344.42
- Mandor Oh 0.007 97,412.42 633.18
Jumlah Upah Tenaga 11,112.10
Jumlah Total 33,932.69
Dibulatkan 33,930.00
22 Pasang list profil cornice wall aluminium tiap 1 m'
Harga bahan:
- wall angle m' 1.100 5,664.59 6,231.05
Jumlah Harga Bahan 6,231.05
Upah tenaga:
- Pekerja Oh 0.113 63,492.89 7,142.95
- Tukang gypsum Oh 0.040 74,788.75 2,991.55
- Kepala tukang Oh 0.004 86,105.63 344.42
- Mandor Oh 0.007 97,412.42 633.18
Jumlah Upah Tenaga 11,112.10
Jumlah Total 17,343.15
Dibulatkan 17,340.00
23. Penutup plafon asbes (1,00 x 1,00) m tebal 2,7 mm tiap 1m²
Harga bahan:
- Plat asbes 100x100 cm 2,7 mm lbr 1.100 10,060.35 11,066.38
- Paku biasa 1/2"- 1" kg 0.010 25,688.00 256.88
Jumlah Harga Bahan 11,323.26
Upah tenaga:
- Pekerja Oh 0.030 63,492.89 1,904.79
- Tukang kayu Oh 0.070 74,788.75 5,235.21
- Kepala tukang Oh 0.007 86,105.63 602.74
- Mandor Oh 0.002 97,412.42 194.82
Jumlah Upah Tenaga 7,937.56
Jumlah Total 19,260.82
Dibulatkan 19,260.00
24. Penutup plafon akustik (60 x 120) cm tiap 1m²
Harga bahan:
- Akustik 60 x 120 cm lbr 1.500 27,321.24 40,981.86
- Paku biasa 1/2"- 1" kg 0.050 25,688.00 1,284.40
Jumlah Harga Bahan 42,266.26
Upah tenaga:
- Pekerja Oh 0.060 63,492.89 3,809.57
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Mandor Oh 0.003 97,412.42 292.24
Jumlah Upah Tenaga 12,441.74
Jumlah Total 54,708.01
Dibulatkan 54,700.00
25. Penutup plafon teakwood (60 x 120) cm tebal 3 mm tiap 1m²
Harga bahan:
- Teakwood 4x8 ft 3 mm lbr 0.375 102,752.00 38,532.00
- Paku biasa 1/2"- 1" kg 0.030 25,688.00 770.64
Jumlah Harga Bahan 39,302.64
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.004 97,412.42 340.94
Jumlah Upah Tenaga 13,125.38
Jumlah Total 52,428.02
Dibulatkan 52,420.00
26. Penutup plafon gypsum board 9 mm tiap 1m²
Harga bahan:
- Gypsumboard 120x240 cm 9 mm lbr 0.364 54,980.32 20,012.84
- Paku Sekrup kg 0.110 21,069.77 2,317.67
- Textile tape rol 0.024 13,434.74 322.43
- Compound gypsum zak 0.020 59,592.13 1,191.84
- Amplas lbr 0.100 5,928.00 592.80
Jumlah Harga Bahan 24,437.59
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang gypsum Oh 0.050 74,788.75 3,739.44
- Kepala tukang Oh 0.005 86,105.63 430.53
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 11,006.32
Jumlah Total 35,443.90
Dibulatkan 35,440.00
27. Penutup plafon GRC-board 4 mm tiap 1m²
Harga bahan:
- GRC-board 120x240 cm 4 mm lbr 0.364 100,564.17 36,605.36
- Paku Sekrup kg 0.110 21,069.77 2,317.67
- Textile tape rol 0.024 13,434.74 322.43
- Compound GRC zak 0.020 63,756.11 1,275.12
- Amplas lbr 0.100 5,928.00 592.80
Jumlah Harga Bahan 41,113.39
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang gypsum Oh 0.050 74,788.75 3,739.44
- Kepala tukang Oh 0.005 86,105.63 430.53
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 11,006.32
Jumlah Total 52,119.71
Dibulatkan 52,110.00
28. Penutup plafon Calsiboard 4 mm tiap 1m²
Harga bahan:
- Calsiboard 120x240 cm 6 mm lbr 0.364 63,088.31 22,964.14
- Paku Sekrup kg 0.110 21,069.77 2,317.67
- Textile tape rol 0.024 13,434.74 322.43
- Compound GRC zak 0.020 63,756.11 1,275.12
- Amplas lbr 0.100 5,928.00 592.80
Jumlah Harga Bahan 27,472.17
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang gypsum Oh 0.050 74,788.75 3,739.44
- Kepala tukang Oh 0.005 86,105.63 430.53
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 11,006.32
Jumlah Total 38,478.49
Dibulatkan 38,470.00
29. Penutup plafon triplek 4 mm tiap 1m²
Harga bahan:
- Paku biasa 1/2"- 1" kg 0.030 25,688.00 770.64
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Triplek 4x8 ft 4 mm lbr 0.375 145,236.00 54,463.50
Jumlah Harga Bahan 55,234.14
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 13,174.08
Jumlah Total 68,408.22
Dibulatkan 68,400.00
30. Penutup plafon triplek 6 mm tiap 1m²
Harga bahan:
- Paku biasa 1/2"- 1" kg 0.030 25,688.00 770.64
- Triplek 4x8 ft 6 mm lbr 0.375 224,276.00 84,103.50
Jumlah Harga Bahan 84,874.14
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 13,174.08
Jumlah Total 98,048.22
Dibulatkan 98,040.00
31. Penutup plafon asbes (1,00 x 1,00) m tebal 2,7 mm lengkap rangka Kamper Medan/Kruing tiap 1m²
Harga bahan:
- Kayu Kamper Medan/Kruing balok m³ 0.012 4,791,725.70 57,500.71
- Paku biasa 1/2"- 1" kg 0.110 25,688.00 2,825.68
- Plat asbes 100x100 cm 2,7 mm lbr 1.100 10,060.35 11,066.38
Jumlah Harga Bahan 71,392.77
Upah tenaga:
- Pekerja Oh 0.180 63,492.89 11,428.72
- Tukang kayu Oh 0.320 74,788.75 23,932.40
- Kepala tukang Oh 0.032 86,105.63 2,755.38
- Mandor Oh 0.009 97,412.42 876.71
Jumlah Upah Tenaga 38,993.21
Jumlah Total 110,385.98
Dibulatkan 110,380.00
32. Penutup plafon triplek 4 mm (60 x 120) cm lengkap rangka Kamper Medan/Kruing tiap 1m²
Harga bahan:
- Kayu Kamper Medan/Kruing balok m³ 0.013 4,791,725.70 62,292.43
- Paku biasa 1/2"- 1" kg 0.160 25,688.00 4,110.08
- Triplek 4x8 ft 4 mm lbr 0.364 145,236.00 52,865.90
Jumlah Harga Bahan 119,268.42
Upah tenaga:
- Pekerja Oh 0.260 63,492.89 16,508.15
- Tukang kayu Oh 0.310 74,788.75 23,184.51
- Kepala tukang Oh 0.031 86,105.63 2,669.27
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 43,628.30
Jumlah Total 162,896.72
Dibulatkan 162,890.00
33. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tebal 0.8 mm / tiap (6mx6m) = 36 m²
Harga bahan:
- Paku peluru ramset bh 14.000 3,692.59 51,696.27
- Hollow 4x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 16.500 58,075.81 958,250.86
- Hollow 2x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 15.510 43,116.89 668,742.95
- Paku beton kg 0.357 29,640.00 10,581.48
- Sekrup 6x1-1,5 bh 502.000 1,139.20 571,880.17
- Gypsumboard 120x240 cm 9 mm lbr 13.125 54,980.32 721,616.68
- Sekrup gypsum bh 745.000 609.67 454,204.37
- Textile tape rol 0.864 13,434.74 11,607.62
- Compound gypsum zak 0.720 59,592.13 42,906.33
- Amplas lbr 3.600 5,928.00 21,340.80
Jumlah Harga Bahan 3,512,827.54
Upah tenaga:
- Pekerja Oh 9.360 63,492.89 594,293.43
- Tukang alumunium Oh 9.360 74,788.75 700,022.70
- Tukang gypsum Oh 1.800 74,788.75 134,619.75
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Kepala tukang Oh 1.116 86,105.63 96,093.88
- Mandor Oh 0.468 97,412.42 45,589.01
Jumlah Upah Tenaga 1,570,618.78
Jumlah Total 5,083,446.31
Dibulatkan 5,083,440.00
34. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tebal 0.8 mm / tiap 1 m²
Harga bahan:
- Paku peluru ramset bh 0.390 3,692.59 1,440.11
- Hollow 4x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 0.459 58,075.81 26,656.80
- Hollow 2x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 0.431 43,116.89 18,583.38
- Paku beton kg 0.010 29,640.00 296.40
- Sekrup 6x1-1,5 bh 14.000 1,139.20 15,948.85
- Gypsumboard 120x240 cm 9 mm lbr 0.364 54,980.32 20,012.84
- Sekrup gypsum bh 21.000 609.67 12,803.08
- Textile tape rol 0.024 13,434.74 322.43
- Compound gypsum zak 0.020 59,592.13 1,191.84
- Amplas lbr 0.100 5,928.00 592.80
Jumlah Harga Bahan 97,848.52
Upah tenaga:
- Pekerja Oh 0.260 63,492.89 16,508.15
- Tukang alumunium Oh 0.260 74,788.75 19,445.08
- Tukang gypsum Oh 0.050 74,788.75 3,739.44
- Kepala tukang Oh 0.031 86,105.63 2,669.27
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 43,628.30
Jumlah Total 141,476.82
Dibulatkan 141,470.00
35. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tebal 0.8 mm / tiap 1 m²
Harga bahan:
- Paku peluru ramset bh 0.390 3,692.59 1,440.11
- Hollow 4x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 0.459 58,075.81 26,656.80
- Hollow 2x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 0.431 43,116.89 18,583.38
- Paku beton kg 0.010 29,640.00 296.40
- Sekrup 6x1-1,5 bh 14.000 1,139.20 15,948.85
- Gypsumboard 120x240 cm 9 mm lbr 0.364 54,980.32 20,012.84
- Sekrup gypsum bh 21.000 609.67 12,803.08
- Textile tape rol 0.024 13,434.74 322.43
- Compound gypsum zak 0.020 59,592.13 1,191.84
- Amplas lbr 0.100 5,928.00 592.80
Jumlah Harga Bahan 97,848.52
Upah tenaga:
- Pekerja Oh 0.260 63,492.89 16,508.15
- Tukang alumunium Oh 0.260 74,788.75 19,445.08
- Tukang gypsum Oh 0.050 74,788.75 3,739.44
- Kepala tukang Oh 0.031 86,105.63 2,669.27
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 43,628.30
Jumlah Total 141,476.82
Dibulatkan 141,470.00
36. Penutup plafon GRC-board 4 mm lengkap dgn rangka hollow tebal 0.8 mm / tiap 1 m²
Harga bahan:
- Paku peluru ramset bh 0.390 3,692.59 1,440.11
- Hollow 4x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 0.459 58,075.81 26,656.80
- Hollow 2x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 0.431 43,116.89 18,583.38
- Paku beton kg 0.010 29,640.00 296.40
- Sekrup 6x1-1,5 bh 14.000 1,139.20 15,948.85
- GRC-board 120x240 cm 4 mm lbr 0.364 44,907.40 16,346.29
- Sekrup gypsum bh 21.000 609.67 12,803.08
- Textile tape rol 0.024 13,434.74 322.43
- Compound GRC zak 0.020 63,756.11 1,275.12
- Amplas lbr 0.100 5,928.00 592.80
Jumlah Harga Bahan 94,265.26
Upah tenaga:
- Pekerja Oh 0.260 63,492.89 16,508.15
- Tukang alumunium Oh 0.260 74,788.75 19,445.08
- Tukang gypsum Oh 0.050 74,788.75 3,739.44
- Kepala tukang Oh 0.031 86,105.63 2,669.27
- Mandor Oh 0.013 97,412.42 1,266.36
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Upah Tenaga 43,628.30
Jumlah Total 137,893.56
Dibulatkan 137,890.00
37. Penutup plafon Calsiboard 6 mm lengkap dgn rangka hollow tebal 0.8 mm / tiap 1 m²
Harga bahan:
- Paku peluru ramset bh 0.390 3,692.59 1,440.11
- Hollow 4x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 0.459 58,075.81 26,656.80
- Hollow 2x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 0.431 43,116.89 18,583.38
- Paku beton kg 0.010 29,640.00 296.40
- Sekrup 6x1-1,5 bh 14.000 1,139.20 15,948.85
- Calsiboard 120x240 cm 6 mm lbr 0.364 63,088.31 22,964.14
- Sekrup gypsum bh 21.000 609.67 12,803.08
- Textile tape rol 0.024 13,434.74 322.43
- Compound GRC zak 0.020 63,756.11 1,275.12
- Amplas lbr 0.100 5,928.00 592.80
Jumlah Harga Bahan 100,883.11
Upah tenaga:
- Pekerja Oh 0.260 63,492.89 16,508.15
- Tukang alumunium Oh 0.260 74,788.75 19,445.08
- Tukang gypsum Oh 0.050 74,788.75 3,739.44
- Kepala tukang Oh 0.031 86,105.63 2,669.27
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 43,628.30
Jumlah Total 144,511.41
Dibulatkan 144,510.00
37 Penutup plafon Akustik ukuran 60x120 cm + rangka alumunium / tiap 1 m²
Harga bahan:
- Profil alumunium "T" (akustik) m' 3.600 16,813.07 60,527.06
- Kawat diameter 5 mm kg 0.150 12,609.80 1,891.47
- Paku peluru ramset bh 1.050 3,692.59 3,877.22
- Akustik 60 x 120 cm lbr 1.500 27,321.24 40,981.86
Jumlah Harga Bahan 107,277.62
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang gypsum Oh 0.500 74,788.75 37,394.38
- Kepala tukang Oh 0.050 86,105.63 4,305.28
- Mandor Oh 0.008 97,412.42 730.59
Jumlah Upah Tenaga 51,954.18
Jumlah Total 159,231.80
Dibulatkan 159,230.00
38. Plafond Papan (Lambriziring) 10 cm, tebal 1 cm + Rangka Kayu Kamper Samarinda Oven tiap 1 m2
Harga bahan:
- Kayu Borneo balok bh 0.020 2,900,255.03 58,005.10
- Paku biasa 2"-5" btg 0.200 20,748.00 4,149.60
- Kayu Kamper Samarinda oven papan btg 0.020 7,129,057.06 142,581.14
Jumlah Harga Bahan 204,735.84
Upah tenaga:
- Pekerja Oh 0.350 63,492.89 22,222.51
- Tukang kayu Oh 0.050 74,788.75 3,739.44
- Kepala tukang Oh 0.031 86,105.63 2,669.27
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 29,897.58
Jumlah Total 234,633.43
Dibulatkan 234,630.00
39 Perapihan langit-langit beton exposed
Harga bahan:
- Semen portland kg 6.90000 1,521.52 10,498.49
- pasir pasang m3 0.01810 355,680.00 6,436.11
- bobok beton utk plester m3 0.95238 4,000.00 3,809.52
Jumlah Harga Bahan 20,744.13
Upah tenaga:
- tukang batu org/hr 0.19048 74,788.75 14,245.48
- kepala tukang org/hr 0.01905 86,105.63 1,640.11
- pekerja org/hr 0.19048 63,492.89 12,093.88
- mandor org/hr 0.01429 97,412.42 1,391.61
Jumlah Upah Tenaga 29,371.07
Jumlah Total 50,115.20
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Dibulatkan 50,110.00
40 Langit-langit Alumunium Linier + Rangka tiap 1 m2
Harga bahan:
- Alumunium Linier + Rangka m2 1.00 274,980.16 274,980.16
- Paku sekrup kg 0.11 21,069.77 2,317.67
Jumlah Harga Bahan 277,297.83
Upah tenaga:
- Pekerja org/hr 0.100 63,492.89 6,349.29
- Tukang kayu org/hr 0.050 74,788.75 3,739.44
- Kepala tukang org/hr 0.005 86,105.63 430.53
- Mandor org/hr 0.005 97,412.42 487.06
Jumlah Upah Tenaga 11,006.32
Jumlah Total 288,304.15
Dibulatkan 288,300.00
Upah tenaga:
- Pekerja org/hr 0.1500 63,492.89 9,523.93
- Tukang kayu org/hr 0.5000 74,788.75 37,394.38
- Kepala tukang org/hr 0.0500 86,105.63 4,305.28
- Mandor org/hr 0.0075 97,412.42 730.59
Jumlah Upah Tenaga 51,954.18
Jumlah Total 137,914.07
Dibulatkan 137,910.00
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang kayu Oh 0.450 74,788.75 33,654.94
- Kepala tukang Oh 0.045 86,105.63 3,874.75
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 47,832.92
Jumlah Total 185,113.44
Dibulatkan 185,110.00
2. Pasang rangka dinding pemisah Kayu Meranti Palembang tiap 1m²
Harga bahan:
- Kayu Meranti Palembang balok m³ 0.028 4,347,200.00 121,721.60
- Paku biasa 2"-5" kg 0.150 20,748.00 3,112.20
Jumlah Harga Bahan 124,833.80
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang kayu Oh 0.450 74,788.75 33,654.94
- Kepala tukang Oh 0.045 86,105.63 3,874.75
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 47,832.92
Jumlah Total 172,666.72
Dibulatkan 172,660.00
3. Pasang dinding pemisah teakwood rangkap rangka Kayu Kamper Medan/Kruing tiap 1m²
Harga bahan:
- Kayu Kamper Medan/Kruing balok m³ 0.028 4,791,725.70 134,168.32
- Paku biasa 2"-5" kg 0.150 20,748.00 3,112.20
- Lem kayu lt 0.560 22,988.34 12,873.47
- Teakwood 4x8 ft 3 mm lbr 0.860 102,752.00 88,366.72
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Harga Bahan 238,520.71
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.600 74,788.75 44,873.25
- Kepala tukang Oh 0.060 86,105.63 5,166.34
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 63,712.29
Jumlah Total 302,233.00
Dibulatkan 302,230.00
4. Pasang dinding pemisah teakwood rangkap rangka Kayu Meranti Palembang tiap 1m²
Harga bahan:
- Kayu Meranti Palembang balok m³ 0.028 4,347,200.00 121,721.60
- Paku biasa 2"-5" kg 0.150 20,748.00 3,112.20
- Lem kayu lt 0.560 22,988.34 12,873.47
- Teakwood 4x8 ft 3 mm lbr 0.860 102,752.00 88,366.72
Jumlah Harga Bahan 226,073.99
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.600 74,788.75 44,873.25
- Kepala tukang Oh 0.060 86,105.63 5,166.34
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 63,712.29
Jumlah Total 289,786.28
Dibulatkan 289,780.00
5. Pasang teakwood tebal 3 mm untuk dinding tiap 1m²
Harga bahan:
- Paku biasa 1/2"- 1" kg 0.050 25,688.00 1,284.40
- Teakwood 4x8 ft 3 mm lbr 0.400 102,752.00 41,100.80
Jumlah Harga Bahan 42,385.20
Upah tenaga:
- Pekerja Oh 0.025 63,492.89 1,587.32
- Tukang kayu Oh 0.075 74,788.75 5,609.16
- Kepala tukang Oh 0.008 86,105.63 645.79
- Mandor Oh 0.001 97,412.42 126.64
Jumlah Upah Tenaga 7,968.91
Jumlah Total 50,354.11
Dibulatkan 50,350.00
6. Pasang triplek tebal 4 mm untuk dinding tiap 1m²
Harga bahan:
- Paku biasa 1/2"- 1" kg 0.050 25,688.00 1,284.40
- Triplek 4x8 ft 4 mm lbr 0.400 145,236.00 58,094.40
Jumlah Harga Bahan 59,378.80
Upah tenaga:
- Pekerja Oh 0.025 63,492.89 1,587.32
- Tukang kayu Oh 0.075 74,788.75 5,609.16
- Kepala tukang Oh 0.008 86,105.63 645.79
- Mandor Oh 0.001 97,412.42 126.64
Jumlah Upah Tenaga 7,968.91
Jumlah Total 67,347.71
Dibulatkan 67,340.00
7. Pasang triplek tebal 6 mm untuk dinding tiap 1m²
Harga bahan:
- Paku biasa 1/2"- 1" kg 0.050 25,688.00 1,284.40
- Triplek 4x8 ft 6 mm lbr 0.400 224,276.00 89,710.40
Jumlah Harga Bahan 90,994.80
Upah tenaga:
- Pekerja Oh 0.025 63,492.89 1,587.32
- Tukang kayu Oh 0.075 74,788.75 5,609.16
- Kepala tukang Oh 0.008 86,105.63 645.79
- Mandor Oh 0.001 97,412.42 126.64
Jumlah Upah Tenaga 7,968.91
Jumlah Total 98,963.71
Dibulatkan 98,960.00
8. Pasang gypsum tebal 12 mm untuk dinding tiap 1m²
Harga bahan:
- Paku biasa 1/2"- 1" kg 0.050 25,688.00 1,284.40
- Gypsumboard 120x240 cm 12 mm lbr 0.400 60,861.75 24,344.70
Jumlah Harga Bahan 25,629.10
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Upah tenaga:
- Pekerja Oh 0.025 63,492.89 1,587.32
- Tukang kayu Oh 0.075 74,788.75 5,609.16
- Kepala tukang Oh 0.008 86,105.63 645.79
- Mandor Oh 0.001 97,412.42 126.64
Jumlah Upah Tenaga 7,968.91
Jumlah Total 33,598.01
Dibulatkan 33,590.00
9. Dinding partisi gypsum 12 mm lkp rk metal Studs 2 muka tiap 1 m²
Harga bahan:
- Metal wall stud 35mm x 40mm m' 2.000 12,505.31 25,010.62
- Metal wall track 30mm x 40mm m' 0.750 12,455.03 9,341.27
- Paku rivet bh 4.000 235.70 942.79
- Sekrup 6x1-1,5 bh 8.000 1,139.20 9,113.63
- Gypsumboard 120x240 cm 12 mm lbr 0.750 60,861.75 45,646.31
- Textile tape roll 0.240 13,434.74 3,224.34
- Compound gypsum zak 0.120 59,592.13 7,151.06
- Sekrup gypsum bh 24.000 609.67 14,632.09
- Amplas lbr 0.500 5,928.00 2,964.00
Jumlah Harga Bahan 118,026.11
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang gypsum Oh 0.300 74,788.75 22,436.63
- Tukang alumunium Oh 0.200 74,788.75 14,957.75
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 51,554.14
Jumlah Total 169,580.25
Dibulatkan 169,580.00
10. Dinding partisi gypsum 12 mm lkp rk hollow tiap 1 m²
Harga bahan:
- Hollow 4x4 cm tbl 1,7 mm ( P = 6 m ) Besi btg 1.250 101,106.28 126,382.85
- Hollow 2x4 cm tbl 1,7 mm ( P = 6 m ) Besi btg 0.800 76,381.63 61,105.31
- Paku rivet bh 4.000 235.70 942.79
- Sekrup 6x1-1,5 bh 8.000 1,139.20 9,113.63
- Gypsumboard 120x240 cm 12 mm lbr 0.750 60,861.75 45,646.31
- Textile tape roll 0.240 13,434.74 3,224.34
- Compound gypsum zak 0.120 59,592.13 7,151.06
- Sekrup gypsum bh 24.000 609.67 14,632.09
- Amplas lbr 0.500 5,928.00 2,964.00
Jumlah Harga Bahan 271,162.36
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang gypsum Oh 0.300 74,788.75 22,436.63
- Tukang alumunium Oh 0.200 74,788.75 14,957.75
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 51,554.14
Jumlah Total 322,716.50
Dibulatkan 322,710.00
11. Dinding partisi double GRC-board 6 mm rk Kamper Medan/Kruing tiap 1 m²
Harga bahan:
- Kayu Kamper Medan/Kruing balok m³ 0.025 4,791,725.70 119,793.14
- Paku biasa 2"-5" kg 0.300 20,748.00 6,224.40
- GRC-board 120x240 cm 6 mm lbr 0.750 100,564.17 75,423.13
- Textile tape roll 0.240 13,434.74 3,224.34
- Compound GRC zak 0.120 63,756.11 7,650.73
- Sekrup gypsum bh 32.000 609.67 19,509.45
- Amplas lbr 0.500 5,928.00 2,964.00
Jumlah Harga Bahan 234,789.19
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.600 74,788.75 44,873.25
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 58,545.95
Jumlah Total 293,335.15
Dibulatkan 293,330.00
12. Dinding partisi double GRC-board 6 mm rk hollow tiap 1 m²
Harga bahan:
- Hollow 4x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 1.250 58,075.81 72,594.76
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Hollow 2x4 cm tbl 0.8 mm ( P = 6 m ) Besi btg 0.800 43,116.89 34,493.51
- Paku rivet bh 4.000 235.70 942.79
- Sekrup 6x1-1,5 bh 8.000 1,139.20 9,113.63
- Gypsumboard 120x240 cm 9 mm lbr 0.750 54,980.32 41,235.24
- Textile tape roll 0.240 13,434.74 3,224.34
- Compound GRC zak 0.120 63,756.11 7,650.73
- Sekrup gypsum bh 24.000 609.67 14,632.09
- Amplas lbr 0.500 5,928.00 2,964.00
Jumlah Harga Bahan 186,851.09
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.300 74,788.75 22,436.63
- Tukang alumunium Oh 0.200 74,788.75 14,957.75
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 51,554.14
Jumlah Total 238,405.23
Dibulatkan 238,400.00
J PEKERJAAN BETON
1. Beton Non Struktur 1Pc : 3Ps : 5Kr - untuk rabatan/ beton tumbuk tiap 1m³
Harga bahan:
- Semen portland kg 218.000 1,521.52 331,691.36
- Pasir beton m³ 0.520 355,680.00 184,953.60
- Batu pecah/split 2/3 m³ 0.870 168,355.20 146,469.02
Jumlah Harga Bahan 663,113.98
Upah tenaga:
- Pekerja Oh 1.650 63,492.89 104,763.26
- Tukang batu Oh 0.250 74,788.75 18,697.19
- Kepala tukang Oh 0.025 86,105.63 2,152.64
- Mandor Oh 0.080 97,412.42 7,792.99
Jumlah Upah Tenaga 133,406.09
Jumlah Total 796,520.07
Dibulatkan 796,520.00
2. Lantai Kerja Beton 1Pc : 3Ps : 5Kr - untuk beton tumbuk tebal 5 cm
Harga bahan:
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir beton m³ 0.026 355,680.00 9,247.68
- Batu pecah/split 2/3 m³ 0.044 168,355.20 7,407.63
Jumlah Harga Bahan 31,870.51
Upah tenaga:
- Pekerja Oh 1.150 63,492.89 73,016.82
- Tukang batu Oh 0.020 74,788.75 1,495.78
- Kepala tukang Oh 0.002 86,105.63 172.21
- Mandor Oh 0.006 97,412.42 584.47
Jumlah Upah Tenaga 75,269.28
Jumlah Total 107,139.79
Dibulatkan 107,130.00
3. Beton K-125 (1Pc : 3Ps : 4Kr) tiap 1m³
Harga bahan:
- Semen portland kg 276.000 1,521.52 419,939.52
- Pasir beton m³ 0.591 355,680.00 210,206.88
- Batu pecah/split 2/3 m³ 0.756 168,355.20 127,276.53
Jumlah Harga Bahan 757,422.93
Upah tenaga:
- Pekerja Oh 1.650 63,492.89 104,763.26
- Tukang batu Oh 0.275 74,788.75 20,566.91
- Kepala tukang Oh 0.028 86,105.63 2,410.96
- Mandor Oh 0.083 97,412.42 8,085.23
Jumlah Upah Tenaga 135,826.36
Jumlah Total 893,249.29
Dibulatkan 893,240.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
4. Beton K-175 (1Pc : 2,5Ps : 3,5Kr) tiap 1m³
Harga bahan:
- Semen portland kg 326.000 1,521.52 496,015.52
- Pasir beton m³ 0.543 355,680.00 193,134.24
- Batu pecah/split 2/3 m³ 0.762 168,355.20 128,286.66
Jumlah Harga Bahan 817,436.42
Upah tenaga:
- Pekerja Oh 1.650 63,492.89 104,763.26
- Tukang batu Oh 0.275 74,788.75 20,566.91
- Kepala tukang Oh 0.028 86,105.63 2,410.96
- Mandor Oh 0.083 97,412.42 8,085.23
Jumlah Upah Tenaga 135,826.36
Jumlah Total 953,262.78
Dibulatkan 953,260.00
5. Beton Struktur K-225 (1Pc : 2Ps : 3Kr) tiap 1m³
Harga bahan:
- Semen portland kg 371.000 1,521.52 564,483.92
- Pasir beton m³ 0.499 355,680.00 177,342.05
- Batu pecah/split 2/3 m³ 0.582 168,355.20 97,932.22
- Air bersih m³ 0.215 4,713.95 1,013.50
Jumlah Harga Bahan 840,771.69
Upah tenaga:
- Pekerja Oh 1.650 63,492.89 104,763.26
- Tukang batu Oh 0.275 74,788.75 20,566.91
- Kepala tukang Oh 0.028 86,105.63 2,410.96
- Mandor Oh 0.083 97,412.42 8,036.52
Jumlah Upah Tenaga 135,777.65
Jumlah Total 976,549.34
Dibulatkan 976,540.00
6. Beton Struktur K-250 (1Pc : 1,65Ps : 3Kr) tiap 1m³
Harga bahan:
- Semen portland kg 384 1,521.52 584,263.68
- Pasir beton m³ 0.494 355,680.00 175,705.92
- Batu pecah/split 2/3 m³ 0.5772 168,355.20 97,174.62
- Air bersih m³ 0.215 4,713.95 1,013.50
Jumlah Harga Bahan 858,157.72
Upah tenaga:
- Pekerja Oh 1.65 63,492.89 104,763.26
- Tukang batu Oh 0.275 74,788.75 20,566.91
- Kepala tukang Oh 0.028 86,105.63 2,410.96
- Mandor Oh 0.083 97,412.42 8,085.23
Jumlah Upah Tenaga 135,826.36
Jumlah Total 993,984.08
Dibulatkan 993,980.00
7. Beton Struktur K-350 (1Pc : 2Ps : 3Kr) tiap 1m³
Harga bahan:
- Semen portland kg 448.000 1,521.52 681,640.96
- Pasir beton m³ 0.476 355,680.00 169,445.95
- Batu pecah/split 2/3 m³ 0.556 168,355.20 93,538.15
- Air bersih m³ 0.215 4,713.95 1,013.50
Jumlah Harga Bahan 945,638.56
Upah tenaga:
- Pekerja Oh 2.100 63,492.89 133,335.06
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.105 97,412.42 10,228.30
Jumlah Upah Tenaga 172,753.13
Jumlah Total 1,118,391.69
Dibulatkan 1,118,390.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pekerja Oh 1.650 63,492.89 104,763.26
- Tukang batu Oh 0.275 74,788.75 20,566.91
- Kepala tukang Oh 0.028 86,105.63 2,367.90
- Mandor Oh 0.083 97,412.42 8,036.52
Jumlah Upah Tenaga 135,734.60
Jumlah Total 1,033,629.68
Dibulatkan 1,033,620.00
9. Beton Struktur K-400 (1Pc : 1,5Ps : 2,5Kr) tiap 1m³
Harga bahan:
- Semen portland kg 450.000 1,521.52 684,684.00
- Pasir beton m³ 0.460 355,680.00 163,612.80
- Batu pecah/split 2/3 m³ 0.790 168,355.20 133,000.61
Jumlah Harga Bahan 981,297.41
Upah tenaga:
- Pekerja Oh 2.000 63,492.89 126,985.78
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.100 97,412.42 9,741.24
Jumlah Upah Tenaga 165,916.78
Jumlah Total 1,147,214.18
Dibulatkan 1,147,210.00
10. Beton Cyclope 1pc:3ps:5kr tiap 1m³
Harga bahan:
- Batu kali m³ 0.700 355,680.00 248,976.00
- Semen portland kg 61.250 1,521.52 93,193.10
- Pasir pasang m³ 0.400 355,680.00 142,272.00
- Batu pecah/split 2/3 m³ 0.650 168,355.20 109,430.88
Jumlah Harga Bahan 593,871.98
Upah tenaga:
- Pekerja Oh 6.000 63,492.89 380,957.33
- Tukang batu Oh 1.000 74,788.75 74,788.75
- Kepala tukang Oh 0.100 86,105.63 8,610.56
- Mandor Oh 0.300 97,412.42 29,223.73
Jumlah Upah Tenaga 493,580.36
Jumlah Total 1,087,452.34
Dibulatkan 1,087,450.00
10. Pembesian dengan besi polos tiap 1 kg
Harga bahan:
- Besi beton polos kg 1.050 10,868.00 11,411.40
- Kawat beton kg 0.015 30,628.00 459.42
Jumlah Harga Bahan 11,870.82
Upah tenaga:
- Pekerja Oh 0.007 63,492.89 444.45
- Tukang besi Oh 0.007 74,788.75 523.52
- Kepala tukang Oh 0.007 86,105.63 602.74
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 1,960.36
Jumlah Total 13,831.18
Dibulatkan 13,830.00
11. Pembesian dengan besi ulir tiap 1 kg
Harga bahan:
- Besi beton ulir kg 1.050 11,174.28 11,732.99
- Kawat beton kg 0.015 30,628.00 459.42
Jumlah Harga Bahan 12,192.41
Upah tenaga:
- Pekerja Oh 0.007 63,492.89 444.45
- Tukang besi Oh 0.007 74,788.75 523.52
- Kepala tukang Oh 0.007 86,105.63 602.74
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 1,960.36
Jumlah Total 14,152.77
Dibulatkan 14,150.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
12. Pasang bekisting untuk pondasi 1 m²
Harga bahan:
- Kayu Terentang papan 3 cm m³ 0.040 2,370,067.36 94,802.69
- Paku biasa 2"-5" kg 0.300 20,748.00 6,224.40
- Minyak Bekisting lt 0.100 1,964.14 196.41
Jumlah Harga Bahan 101,223.51
Upah tenaga:
- Pekerja Oh 0.520 63,492.89 33,016.30
- Tukang kayu Oh 0.260 74,788.75 19,445.08
- Kepala tukang Oh 0.026 86,105.63 2,238.75
- Mandor Oh 0.026 97,412.42 2,532.72
Jumlah Upah Tenaga 57,232.85
Jumlah Total 158,456.35
4X Pakai Dibulatkan 39,612.50
13. Pasang bekisting untuk sloof 1 m²
Harga bahan:
- Kayu Terentang papan 3 cm m³ 0.045 2,370,067.36 106,653.03
- Paku biasa 2"-5" kg 0.300 20,748.00 6,224.40
- Minyak Bekisting lt 0.100 1,964.14 196.41
Jumlah Harga Bahan 113,073.85
Upah tenaga:
- Pekerja Oh 0.520 63,492.89 33,016.30
- Tukang kayu Oh 0.260 74,788.75 19,445.08
- Kepala tukang Oh 0.026 86,105.63 2,238.75
- Mandor Oh 0.026 97,412.42 2,532.72
Jumlah Upah Tenaga 57,232.85
Jumlah Total 170,306.69
4X Pakai Dibulatkan 42,575.00
14. Pasang bekisting untuk sloof 1 m² dengan bahan tripleks 9 mm
Harga bahan:
- Triplek 4x8 ft 9 mm lbr 0.350 322,088.00 112,730.80
- Kayu Terentang kaso m³ 0.030 2,479,928.21 74,397.85
- Paku biasa 2"-5" kg 0.300 20,748.00 6,224.40
- Minyak Bekisting lt 0.100 1,964.14 196.41
Jumlah Harga Bahan 193,549.46
Upah tenaga:
- Pekerja Oh 0.520 63,492.89 33,016.30
- Tukang kayu Oh 0.260 74,788.75 19,445.08
- Kepala tukang Oh 0.026 86,105.63 2,238.75
- Mandor Oh 0.026 97,412.42 2,532.72
Jumlah Upah Tenaga 57,232.85
Jumlah Total 250,782.31
4X Pakai Dibulatkan 62,695.00
15. Pasang bekisting untuk kolom 1 m²
Harga bahan:
- Kayu Terentang kaso m³ 0.040 2,479,928.21 99,197.13
- Paku biasa 2"-5" kg 0.400 20,748.00 8,299.20
- Minyak bekisting lt 0.200 1,964.14 392.83
- Kayu Terentang balok m³ 0.015 2,479,928.21 37,198.92
- Triplek 4x8 ft 9 mm lbr 0.350 322,088.00 112,730.80
- Kayu dolken Ø 8-10/400 cm btg 2.000 19,335.03 38,670.07
Jumlah Harga Bahan 296,488.95
Upah tenaga:
- Pekerja Oh 0.660 63,492.89 41,905.31
- Tukang kayu Oh 0.330 74,788.75 24,680.29
- Kepala tukang Oh 0.033 86,105.63 2,841.49
- Mandor Oh 0.033 97,412.42 3,214.61
Jumlah Upah Tenaga 72,641.69
Jumlah Total 369,130.64
4X Pakai Dibulatkan 92,282.50
16. Pasang bekisting untuk balok 1 m²
Harga bahan:
- Kayu Terentang kaso m³ 0.040 2,479,928.21 99,197.13
- Paku biasa 2"-5" kg 0.400 20,748.00 8,299.20
- Minyak bekisting lt 0.200 1,964.14 392.83
- Kayu Meranti Palembang balok m³ 0.018 4,347,200.00 78,249.60
- Triplek 4x8 ft 9 mm lbr 0.350 322,088.00 112,730.80
- Kayu dolken Ø 8-10/400 cm btg 2.000 19,335.03 38,670.07
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Harga Bahan 337,539.62
Upah tenaga:
- Pekerja Oh 0.660 63,492.89 41,905.31
- Tukang kayu Oh 0.330 74,788.75 24,680.29
- Kepala tukang Oh 0.033 86,105.63 2,841.49
- Mandor Oh 0.033 97,412.42 3,214.61
Jumlah Upah Tenaga 72,641.69
Jumlah Total 410,181.31
4X Pakai Dibulatkan 102,545.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
17. Pasang bekisting untuk pelat lantai 1 m²
Harga bahan:
- Kayu Terentang kaso m³ 0.040 2,479,928.21 99,197.13
- Paku biasa 2"-5" kg 0.400 20,748.00 8,299.20
- Minyak bekisting lt 0.200 1,964.14 392.83
- Kayu Meranti Palembang balok m³ 0.015 4,347,200.00 65,208.00
- Triplek 4x8 ft 9 mm lbr 0.350 322,088.00 112,730.80
- Kayu dolken Ø 8-10/400 cm btg 6.000 19,335.03 116,010.20
Jumlah Harga Bahan 401,838.16
Upah tenaga:
- Pekerja Oh 0.660 63,492.89 41,905.31
- Tukang kayu Oh 0.330 74,788.75 24,680.29
- Kepala tukang Oh 0.033 86,105.63 2,841.49
- Mandor Oh 0.033 97,412.42 3,214.61
Jumlah Upah Tenaga 72,641.69
Jumlah Total 474,479.85
4X Pakai Dibulatkan 118,617.50
18. Pasang bekisting untuk dinding 1 m²
Harga bahan:
- Kayu Terentang kaso m³ 0.030 2,479,928.21 74,397.85
- Paku biasa 2"-5" kg 0.400 20,748.00 8,299.20
- Minyak bekisting lt 0.200 1,964.14 392.83
- Kayu Meranti Palembang balok m³ 0.020 4,347,200.00 86,944.00
- Triplek 4x8 ft 9 mm lbr 0.350 322,088.00 112,730.80
- Kayu dolken Ø 8-10/400 cm btg 3.000 19,335.03 58,005.10
Jumlah Harga Bahan 340,769.78
Upah tenaga:
- Pekerja Oh 0.660 63,492.89 41,905.31
- Tukang kayu Oh 0.330 74,788.75 24,680.29
- Kepala tukang Oh 0.033 86,105.63 2,841.49
- Mandor Oh 0.033 97,412.42 3,214.61
Jumlah Upah Tenaga 72,641.69
Jumlah Total 413,411.46
4X Pakai Dibulatkan 103,352.50
19. Pasang bekisting untuk tangga 1 m²
Harga bahan:
- Kayu Terentang kaso m³ 0.030 2,479,928.21 74,397.85
- Paku biasa 2"-5" kg 0.400 20,748.00 8,299.20
- Minyak Bekisting lt 0.150 1,964.14 294.62
- Kayu Meranti Palembang balok m³ 0.015 4,347,200.00 65,208.00
- Triplek 4x8 ft 9 mm lbr 0.350 322,088.00 112,730.80
- Kayu dolken Ø 8-10/400 cm btg 2.000 19,335.03 38,670.07
Jumlah Harga Bahan 299,600.54
Upah tenaga:
- Pekerja Oh 0.660 63,492.89 41,905.31
- Tukang kayu Oh 0.330 74,788.75 24,680.29
- Kepala tukang Oh 0.033 86,105.63 2,841.49
- Mandor Oh 0.033 97,412.42 3,214.61
Jumlah Upah Tenaga 72,641.69
Jumlah Total 372,242.22
4X Pakai Dibulatkan 93,060.00
20. Membokar cetakan bekesting tiap 1m³
Upah tenaga:
- Pekerja Oh 4.000 63,492.89 253,971.55
Jumlah Upah Tenaga 253,971.55
Dibulatkan 253,970.00
21. Stutwerk untuk 1 m³, tinggi 3 - 4 m (memakai dolken)
Harga bahan:
- Kayu dolken Ø 8-10/400 cm btg 35.000 19,335.03 676,726.17
Jumlah Harga Bahan 676,726.17
Upah tenaga:
- Pekerja Oh 3.500 63,492.89 222,225.11
- Tukang kayu Oh 10.500 74,788.75 785,281.88
- Kepala tukang Oh 1.050 86,105.63 90,410.91
- Mandor Oh 0.175 97,412.42 17,047.17
Jumlah Upah Tenaga 1,114,965.07
Jumlah Total 1,791,691.24
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Dibulatkan 1,791,690.00
22. Stutwerk untuk 1 m³, tinggi 3 - 4 m (memakai scafolding)
Harga bahan:
- Sewa Scafolding unit 32.000 10,889.21 348,454.86
Jumlah Harga Bahan 348,454.86
Upah tenaga:
- Pekerja Oh 2.200 63,492.89 139,684.35
- Tukang kayu Oh 3.500 74,788.75 261,760.63
- Kepala tukang Oh 0.350 86,105.63 30,136.97
- Mandor Oh 0.120 97,412.42 11,689.49
Jumlah Upah Tenaga 443,271.44
Jumlah Total 791,726.30
Dibulatkan 791,720.00
23. Membuat pondasi beton bertulang (150 kg besi + bekisting) tiap 1m³
Harga bahan:
- Kayu Terentang balok m³ 0.200 2,479,928.21 495,985.64
- Paku biasa 2"-5" kg 1.500 20,748.00 31,122.00
- Minyak Bekisting lt 0.400 1,964.14 785.66
- Besi beton polos kg 157.500 10,868.00 1,711,710.00
- Kawat beton kg 2.250 30,628.00 68,913.00
- Semen portland kg 336.000 1,521.52 511,230.72
- Pasir beton m³ 0.540 355,680.00 192,067.20
- Batu pecah/split 2/3 m³ 0.810 168,355.20 136,367.71
Jumlah Harga Bahan 3,148,181.93
Upah tenaga:
- Pekerja Oh 5.300 63,492.89 336,512.30
- Tukang batu Oh 0.275 74,788.75 20,566.91
- Tukang kayu Oh 1.300 74,788.75 97,225.38
- Tukang besi Oh 1.050 74,788.75 78,528.19
- Kepala tukang Oh 0.262 86,105.63 22,559.67
- Mandor Oh 0.265 97,412.42 25,814.29
Jumlah Upah Tenaga 581,206.74
Jumlah Total 3,729,388.67
Dibulatkan 3,729,380.00
24. Membuat sloof beton bertulang (200 kg besi + bekisting) tiap 1m³
Harga bahan:
- Kayu Terentang balok m³ 0.270 2,479,928.21 669,580.62
- Paku biasa 2"-5" kg 2.000 20,748.00 41,496.00
- Minyak Bekisting lt 0.600 1,964.14 1,178.49
- Besi beton polos kg 210.000 10,868.00 2,282,280.00
- Kawat beton kg 3.000 30,628.00 91,884.00
- Semen portland kg 336.000 1,521.52 511,230.72
- Pasir beton m³ 0.540 355,680.00 192,067.20
- Batu pecah/split 2/3 m³ 0.810 168,355.20 136,367.71
Jumlah Harga Bahan 3,926,084.74
Upah tenaga:
- Pekerja Oh 5.650 63,492.89 358,734.81
- Tukang batu Oh 0.275 74,788.75 20,566.91
- Tukang kayu Oh 1.560 74,788.75 116,670.45
- Tukang besi Oh 1.400 74,788.75 104,704.25
- Kepala tukang Oh 0.323 86,105.63 27,812.12
- Mandor Oh 0.283 97,412.42 27,567.72
Jumlah Upah Tenaga 656,056.26
Jumlah Total 4,582,140.99
Dibulatkan 4,582,140.00
25. Membuat kolom beton bertulang (300 kg besi + bekisting) tiap 1m³
Harga bahan:
- Kayu Terentang balok m³ 0.400 2,479,928.21 991,971.29
- Paku biasa 2"-5" kg 4.000 20,748.00 82,992.00
- Minyak Bekisting lt 2.000 1,964.14 3,928.29
- Besi beton ulir kg 315.000 11,174.28 3,519,898.20
- Kawat beton kg 4.500 30,628.00 137,826.00
- Semen portland kg 336.000 1,521.52 511,230.72
- Pasir beton m³ 0.540 355,680.00 192,067.20
- Batu pecah/split 2/3 m³ 0.810 168,355.20 136,367.71
- Kayu Meranti Palembang balok m³ 0.150 4,347,200.00 652,080.00
- Triplek 4x8 ft 9 mm lbr 3.500 322,088.00 1,127,308.00
- Kayu dolken Ø 8-10/400 cm btg 20.000 19,335.03 386,700.67
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Harga Bahan 7,742,370.08
Upah tenaga:
- Pekerja Oh 7.050 63,492.89 447,624.86
- Tukang batu Oh 0.275 74,788.75 20,566.91
- Tukang kayu Oh 1.650 74,788.75 123,401.44
- Tukang besi Oh 2.100 74,788.75 157,056.38
- Kepala tukang Oh 0.403 86,105.63 34,700.57
- Mandor Oh 0.353 97,412.42 34,386.58
Jumlah Upah Tenaga 817,736.73
Jumlah Total 8,560,106.81
Dibulatkan 8,560,100.00
26. Membuat balok beton bertulang (200 kg besi + bekisting) tiap 1m³
Harga bahan:
- Kayu Terentang balok m³ 0.320 2,479,928.21 793,577.03
- Paku biasa 2"-5" kg 3.200 20,748.00 66,393.60
- Minyak Bekisting lt 1.600 1,964.14 3,142.63
- Besi beton ulir kg 210.000 11,174.28 2,346,598.80
- Kawat beton kg 3.000 30,628.00 91,884.00
- Semen portland kg 336.000 1,521.52 511,230.72
- Pasir beton m³ 0.540 355,680.00 192,067.20
- Batu pecah/split 2/3 m³ 0.810 168,355.20 136,367.71
- Kayu Meranti Palembang balok m³ 0.140 4,347,200.00 608,608.00
- Triplek 4x8 ft 9 mm lbr 2.800 322,088.00 901,846.40
- Kayu dolken Ø 8-10/400 cm btg 16.000 19,335.03 309,360.54
Jumlah Harga Bahan 5,961,076.63
Upah tenaga:
- Pekerja Oh 6.350 63,492.89 403,179.84
- Tukang batu Oh 0.275 74,788.75 20,566.91
- Tukang kayu Oh 1.650 74,788.75 123,401.44
- Tukang besi Oh 1.400 74,788.75 104,704.25
- Kepala tukang Oh 0.333 86,105.63 28,673.17
- Mandor Oh 0.318 97,412.42 30,977.15
Jumlah Upah Tenaga 711,502.76
Jumlah Total 6,672,579.38
Dibulatkan 6,672,570.00
27. Membuat balok beton bertulang (150 kg besi + bekisting) tiap 1m³
Harga bahan:
- Kayu Terentang balok m³ 0.320 2,479,928.21 793,577.03
- Paku biasa 2"-5" kg 3.200 20,748.00 66,393.60
- Minyak Bekisting lt 1.600 1,964.14 3,142.63
- Besi beton polos kg 150.000 10,868.00 1,630,200.00
- Kawat beton kg 2.250 30,628.00 68,913.00
- Semen portland kg 323.000 1,521.52 491,450.96
- Pasir beton m³ 0.520 355,680.00 184,953.60
- Batu pecah/split 2/3 m³ 0.780 168,355.20 131,317.06
- Kayu Meranti Palembang balok m³ 0.120 4,347,200.00 521,664.00
- Triplek 4x8 ft 9 mm lbr 2.800 322,088.00 901,846.40
- Kayu dolken Ø 8-10/400 cm btg 32.000 19,335.03 618,721.07
Jumlah Harga Bahan 5,412,179.35
Upah tenaga:
- Pekerja Oh 5.800 63,492.89 368,258.75
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Tukang kayu Oh 2.800 74,788.75 209,408.50
- Tukang besi Oh 1.050 74,788.75 78,528.19
- Kepala tukang Oh 0.420 86,105.63 36,164.36
- Mandor Oh 0.185 97,412.42 18,021.30
Jumlah Upah Tenaga 736,557.16
Jumlah Total 6,148,736.51
Dibulatkan 6,148,730.00
28. Membuat dinding beton bertulang (150 kg besi + bekisting) tiap 1m³
Harga bahan:
- Kayu Terentang balok m³ 0.240 2,479,928.21 595,182.77
- Paku biasa 2"-5" kg 3.200 20,748.00 66,393.60
- Minyak Bekisting lt 1.600 1,964.14 3,142.63
- Besi beton polos kg 157.500 10,868.00 1,711,710.00
- Kawat beton kg 2.250 30,628.00 68,913.00
- Semen portland kg 336.000 1,521.52 511,230.72
- Pasir beton m³ 0.540 355,680.00 192,067.20
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Batu pecah/split 2/3 m³ 0.810 168,355.20 136,367.71
- Kayu Meranti Palembang balok m³ 0.160 4,347,200.00 695,552.00
- Triplek 4x8 ft 9 mm lbr 2.800 322,088.00 901,846.40
- Kayu dolken Ø 8-10/400 cm btg 24.000 19,335.03 464,040.80
Jumlah Harga Bahan 5,346,446.84
Upah tenaga:
- Pekerja Oh 5.300 63,492.89 336,512.30
- Tukang batu Oh 0.275 74,788.75 20,566.91
- Tukang kayu Oh 1.300 74,788.75 97,225.38
- Tukang besi Oh 1.050 74,788.75 78,528.19
- Kepala tukang Oh 0.262 86,105.63 22,559.67
- Mandor Oh 0.265 97,412.42 25,814.29
Jumlah Upah Tenaga 581,206.74
Jumlah Total 5,927,653.58
Dibulatkan 5,927,650.00
29. Membuat tangga beton bertulang (200 kg besi + bekisting) tiap 1m³
Harga bahan:
- Kayu Terentang balok m³ 0.250 2,479,928.21 619,982.05
- Paku biasa 2"-5" kg 3.000 20,748.00 62,244.00
- Minyak Bekisting lt 1.200 1,964.14 2,356.97
- Besi beton polos kg 200.000 10,868.00 2,173,600.00
- Kawat beton kg 3.000 30,628.00 91,884.00
- Semen portland kg 323.000 1,521.52 491,450.96
- Pasir beton m³ 0.520 355,680.00 184,953.60
- Batu pecah/split 2/3 m³ 0.780 168,355.20 131,317.06
- Kayu Meranti Palembang balok m³ 0.105 4,347,200.00 456,456.00
- Triplek 4x8 ft 9 mm lbr 2.500 322,088.00 805,220.00
- Kayu dolken Ø 8-10/400 cm btg 14.000 19,335.03 270,690.47
Jumlah Harga Bahan 5,290,155.11
Upah tenaga:
- Pekerja Oh 5.600 63,492.89 355,560.17
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Tukang kayu Oh 2.300 74,788.75 172,014.13
- Tukang besi Oh 1.400 74,788.75 104,704.25
- Kepala tukang Oh 0.405 86,105.63 34,872.78
- Mandor Oh 0.202 97,412.42 19,677.31
Jumlah Upah Tenaga 713,004.70
Jumlah Total 6,003,159.81
Dibulatkan 6,003,150.00
30. Membuat 1 unit pelat pondasi beton bertulang (100 x 100 x 30) cm
Harga bahan:
- Kayu Terentang balok m³ 0.048 2,479,928.21 119,036.55
- Paku biasa 2"-5" kg 0.360 20,748.00 7,469.28
- Minyak Bekisting lt 0.120 1,964.14 235.70
- Besi beton polos kg 30.000 10,868.00 326,040.00
- Kawat beton kg 0.430 30,628.00 13,170.04
- Semen portland kg 105.000 1,521.52 159,759.60
- Pasir beton m³ 0.146 355,680.00 51,751.44
- Batu pecah/split 2/3 m³ 0.218 168,355.20 36,718.27
Jumlah Harga Bahan 714,180.88
Upah tenaga:
- Pekerja Oh 1.160 63,492.89 73,651.75
- Tukang batu Oh 0.105 74,788.75 7,852.82
- Tukang kayu Oh 0.312 74,788.75 23,334.09
- Tukang besi Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.062 86,105.63 5,312.72
- Mandor Oh 0.045 97,412.42 4,344.59
Jumlah Upah Tenaga 129,453.72
Jumlah Total 843,634.60
Dibulatkan 843,630.00
31. Membuat sloof beton bertulang (15 x 20) cm tiap 1 m'
Harga bahan:
- Kayu Terentang papan 3 cm m³ 0.006 2,370,067.36 14,220.40
- Paku biasa 2"-5" kg 0.120 20,748.00 2,489.76
- Minyak Bekisting lt 0.040 1,964.14 78.57
- Besi beton polos kg 4.440 10,868.00 48,253.92
- Kawat beton kg 0.064 30,628.00 1,960.19
- Semen portland kg 10.500 1,521.52 15,975.96
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pasir beton m³ 0.015 355,680.00 5,192.93
- Batu pecah/split 2/3 m³ 0.022 168,355.20 3,703.81
Jumlah Harga Bahan 91,875.54
Upah tenaga:
- Pekerja Oh 0.210 63,492.89 13,333.51
- Tukang kayu Oh 0.104 74,788.75 7,778.03
- Tukang besi Oh 0.030 74,788.75 2,243.66
- Tukang batu Oh 0.011 74,788.75 785.28
- Kepala tukang Oh 0.014 86,105.63 1,244.23
- Mandor Oh 0.006 97,412.42 610.78
Jumlah Upah Tenaga 25,995.48
Jumlah Total 117,871.03
Dibulatkan 117,870.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pek. Sloof Beton Bertulang 20x40 m' 12.500 387,990.00 4,849,875.00 4,849,875.00
Dibulatkan 4,849,870.00
34. Membuat kolom penguat/praktis beton bertulang (11 x 11) cm tiap 1m'
Harga bahan:
- Kayu Terentang papan 3 cm m³ 0.002 2,370,067.36 4,740.13
- Paku biasa 2"-5" kg 0.010 20,748.00 207.48
- Besi beton polos kg 3.000 10,868.00 32,604.00
- Kawat beton kg 0.450 30,628.00 13,782.60
- Semen portland kg 4.000 1,521.52 6,086.08
- Pasir beton m³ 0.006 355,680.00 2,134.08
- Batu pecah/split 2/3 m³ 0.009 168,355.20 1,515.20
Jumlah Harga Bahan 61,069.57
Upah tenaga:
- Pekerja Oh 0.180 63,492.89 11,428.72
- Tukang batu Oh 0.020 74,788.75 1,495.78
- Tukang kayu Oh 0.020 74,788.75 1,495.78
- Tukang besi Oh 0.020 74,788.75 1,495.78
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.009 97,412.42 876.71
Jumlah Upah Tenaga 17,309.39
Jumlah Total 78,378.96
Dibulatkan 78,370.00
---> Pekerjaan Kolom Praktis 11x11 cm tiap 1 m3
- Kolom Penguat/praktis beton bertulang 11x11 m' 82.645 78,370.00 6,476,859.50 6,476,859.50
Dibulatkan 6,476,850.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
37. Membuat kolom beton bertulang (30 x 30) cm tiap 1 m'
Harga bahan:
- Kayu Terentang papan 3 cm m³ 0.048 2,370,067.36 113,763.23
- Paku biasa 2"-5" kg 0.480 20,748.00 9,959.04
- Minyak Bekisting lt 0.240 1,964.14 471.39
- Kayu Terentang balok m³ 0.018 2,479,928.21 44,638.71
- Triplek 4x8 ft 9 mm lbr 0.420 322,088.00 135,276.96
- Kayu dolken Ø 8-10/400 cm btg 2.400 19,335.03 46,404.08
- Besi beton ulir kg 16.200 11,174.28 181,023.34
- Kawat beton kg 0.240 30,628.00 7,350.72
- Semen portland kg 31.500 1,521.52 47,927.88
- Pasir beton m³ 0.044 355,680.00 15,649.92
- Batu pecah/split 2/3 m³ 0.066 168,355.20 11,111.44
Jumlah Harga Bahan 613,576.72
Upah tenaga:
- Pekerja Oh 0.648 63,492.89 41,143.39
- Tukang kayu Oh 0.396 74,788.75 29,616.35
- Tukang besi Oh 0.108 74,788.75 8,077.19
- Tukang batu Oh 0.032 74,788.75 2,355.85
- Kepala tukang Oh 0.054 86,105.63 4,610.96
- Mandor Oh 0.021 97,412.42 2,035.92
Jumlah Upah Tenaga 87,839.64
Jumlah Total 701,416.36
Dibulatkan 701,410.00
38. Membuat ring balok beton bertulang (10 x 15) cm tiap 1m'
Harga bahan:
- Kayu Terentang papan 3 cm m³ 0.003 2,370,067.36 7,110.20
- Paku biasa 2"-5" kg 0.020 20,748.00 414.96
- Besi beton polos kg 3.600 10,868.00 39,124.80
- Kawat beton kg 0.050 30,628.00 1,531.40
- Semen portland kg 5.500 1,521.52 8,368.36
- Pasir beton m³ 0.009 355,680.00 3,201.12
- Batu pecah/split 2/3 m³ 0.015 168,355.20 2,525.33
Jumlah Harga Bahan 62,276.17
Upah tenaga:
- Pekerja Oh 0.297 63,492.89 18,857.39
- Tukang batu Oh 0.033 74,788.75 2,468.03
- Tukang kayu Oh 0.033 74,788.75 2,468.03
- Tukang besi Oh 0.033 74,788.75 2,468.03
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 28,583.72
Jumlah Total 90,859.89
Dibulatkan 90,850.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Upah tenaga:
- Pekerja Oh 0.647 63,492.89 41,079.90
- Tukang kayu Oh 0.330 74,788.75 24,680.29
- Tukang besi Oh 0.087 74,788.75 6,506.62
- Tukang batu Oh 0.042 74,788.75 3,141.13
- Kepala tukang Oh 0.046 86,105.63 3,952.25
- Mandor Oh 0.022 97,412.42 2,113.85
Jumlah Upah Tenaga 81,474.03
Jumlah Total 696,617.28
Dibulatkan 696,610.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pekerjaan beton 1:2:3 m3 0.700 976,540.00 683,578.00
- Bekesting papan m2 0.500 118,617.50 59,308.75
- Besi beton dia 10 mm, 2 lapis jarak 15 cm kg 9.502 13,830.00 131,412.66
- Besi beton dia 8 mm, 2 lapis jarak 20 cm kg 2.607 13,830.00 36,054.81
Jumlah Total 910,354.22
Dibulatkan 910,350.00
43. Plat Duiker Pintu Masuk, lebar saluran 0,75 m tiap 1 m' (Tebal plat 12,5 cm)
- Pekerjaan beton 1:2:3 m3 0.119 976,540.00 116,208.26
- Bekesting papan m2 0.750 118,617.50 88,963.13
- Besi beton dia 10 mm, 2 lapis jarak 15 cm kg 10.859 13,830.00 150,179.97
- Besi beton dia 8 mm, 2 lapis jarak 20 cm kg 2.607 13,830.00 36,054.81
Jumlah Total 391,406.17
Dibulatkan 391,400.00
44. Plat Duiker Pintu Masuk, lebar saluran 1 m tiap 1 m' (Tebal plat 15 cm)
- Pekerjaan beton 1:2:3 m3 0.180 976,540.00 175,777.20
- Bekesting papan m2 1.000 118,617.50 118,617.50
- Besi beton dia 10 mm, 2 lapis jarak 15 cm kg 16.289 13,830.00 225,276.87
- Besi beton dia 8 mm, 2 lapis jarak 20 cm kg 5.214 13,830.00 72,109.62
Jumlah Total 591,781.19
Dibulatkan 591,780.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Upah Tenaga 15,307.19
Jumlah Total 79,633.69
Dibulatkan 79,630.00
5. Pasang atap genteng keramik Ikad natural tiap 1m²
Harga bahan:
- Genteng keramik M Class bh 15.000 5,971.00 89,564.97
Jumlah Harga Bahan 89,564.97
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang kayu Oh 0.060 74,788.75 4,487.33
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 15,307.19
Jumlah Total 104,872.16
Dibulatkan 104,870.00
6. Pasang atap genteng beton Monier standar tiap 1m²
Harga bahan:
- Genteng beton Monier standar bh 11.000 6,939.71 76,336.85
- Paku biasa 2"-5" kg 0.030 20,748.00 622.44
Jumlah Harga Bahan 76,959.29
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 22,012.63
Jumlah Total 98,971.92
Dibulatkan 98,970.00
7. Pasang atap genteng metal tiap 1m²
Harga bahan:
- Genteng metal m² 1.020 86,335.13 88,061.83
- Paku biasa 2"-5" kg 0.200 20,748.00 4,149.60
Jumlah Harga Bahan 92,211.43
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.001 97,412.42 97.41
Jumlah Upah Tenaga 21,135.92
Jumlah Total 113,347.35
Dibulatkan 113,340.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
8. Pasang atap asbes gelombang 2,5 x 0,92 m x 5 mm tiap 1m²
Harga bahan:
- Asbes gelombang 2,5x,92 m 5 mm lbr 0.500 66,579.77 33,289.88
- Paku sekrup kg 0.120 21,069.77 2,528.37
Jumlah Harga Bahan 35,818.26
Upah tenaga:
- Pekerja Oh 0.140 63,492.89 8,889.00
- Tukang kayu Oh 0.075 74,788.75 5,609.16
- Kepala tukang Oh 0.008 86,105.63 688.85
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 15,966.30
Jumlah Total 51,784.56
Dibulatkan 51,780.00
9. Pasang atap asbes gelombang 2,25 x 0,92 m x 5 mm tiap 1m²
Harga bahan:
- Asbes gelombang 2,25x,92 m 5 mm lbr 0.600 57,710.87 34,626.52
- Paku sekrup 3,5" bh 4.000 9,810.51 39,242.03
Jumlah Harga Bahan 73,868.55
Upah tenaga:
- Pekerja Oh 0.140 63,492.89 8,889.00
- Tukang kayu Oh 0.075 74,788.75 5,609.16
- Kepala tukang Oh 0.008 86,105.63 688.85
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 15,966.30
Jumlah Total 89,834.85
Dibulatkan 89,830.00
10. Pasang atap asbes gelombang 2,00 x 0,92 m x 5 mm tiap 1m²
Harga bahan:
- Asbes gelombang 2,00x,92 m 5 mm lbr 0.600 51,069.71 30,641.82
- Paku sekrup kg 0.120 21,069.77 2,528.37
Jumlah Harga Bahan 33,170.20
Upah tenaga:
- Pekerja Oh 0.140 63,492.89 8,889.00
- Tukang kayu Oh 0.070 74,788.75 5,235.21
- Kepala tukang Oh 0.007 86,105.63 602.74
- Mandor Oh 0.007 97,412.42 681.89
Jumlah Upah Tenaga 15,408.84
umlah Bahan & Tenaga 48,579.04
Dibulatkan 48,570.00
11. Pasang atap asbes gelombang 1,80 x 0,92 m x 5 mm tiap 1m²
Harga bahan:
- Asbes gelombang 1,80x,92 m 5 mm lbr 0.750 38,838.20 29,128.65
- Paku sekrup kg 0.120 21,069.77 2,528.37
Jumlah Harga Bahan 31,657.02
- Pekerja Oh 0.140 63,492.89 8,889.00
- Tukang kayu Oh 0.070 74,788.75 5,235.21
- Kepala tukang Oh 0.007 86,105.63 602.74
- Mandor Oh 0.007 97,412.42 681.89
Jumlah Upah Tenaga 15,408.84
Jumlah Total 47,065.86
Dibulatkan 47,060.00
12. Pasang atap seng gelombang BJLS 25 (0,25 mm) tiap 1m²
Harga bahan:
- Seng gelombang 3x6 ft BJLS 25 (0,25 mm) Lbr 0.700 65,208.00 45,645.60
- Paku biasa 1/2"- 1" kg 0.020 25,688.00 513.76
Jumlah Harga Bahan 46,159.36
Upah tenaga:
- Pekerja Oh 0.120 63,492.89 7,619.15
- Tukang kayu Oh 0.060 74,788.75 4,487.33
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.006 97,412.42 584.47
Jumlah Upah Tenaga 13,207.58
Jumlah Total 59,366.94
Dibulatkan 59,360.00
13. Pasang atap Trimdek tiap 1m² t = 0,45 mm
Harga bahan:
- Penutup atap metal Trimdek Colorbond HI - TEN ( 0,40 mm m2 1.000 83,279.71 83,279.71
- angkur pengikat atap bh 4.000 1,257.05 5,028.21
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Harga Bahan 88,307.91
Upah tenaga:
- Pekerja Oh 0.080 63,492.89 5,079.43
- Tukang besi Oh 0.080 74,788.75 5,983.10
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 12,897.71
Jumlah Total 101,205.63
Dibulatkan 101,200.00
14 Pasang lisplang Trimdek tiap 1 m t = 0,45 mm
Harga bahan:
- Penutup atap metal Trimdek Colorbond HI - TEN ( 0,40 mm Lbr 0.528 83,279.71 43,971.68
- angkur pengikat atap bh 4.000 1,257.05 5,028.21
Jumlah Harga Bahan 48,999.89
Upah tenaga:
- Pekerja Oh 0.032 63,492.89 2,031.77
- Tukang besi Oh 0.032 74,788.75 2,393.24
- Kepala tukang Oh 0.004 86,105.63 344.42
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 5,159.08
Jumlah Total 54,158.98
Dibulatkan 54,150.00
15. Pasang atap Fibreglass ukuran 180 X 90 cm tiap 1 m2
Harga bahan:
- Atap Fibreglass Lbr 0.600 45,856.48 27,513.89
- Paku biasa 2"-5" kg 0.050 20,748.00 1,037.40
Jumlah Harga Bahan 28,551.29
Upah tenaga:
- Pekerja Oh 0.140 63,492.89 8,889.00
- Tukang besi Oh 0.070 74,788.75 5,235.21
- Kepala tukang Oh 0.007 86,105.63 602.74
- Mandor Oh 0.007 97,412.42 681.89
Jumlah Upah Tenaga 15,408.84
Jumlah Total 43,960.13
Dibulatkan 43,960.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
16. Pasang alumunium foil double side tiap 1m²
Harga bahan:
- Allumunium foil double side m² 1.050 21,016.34 22,067.16
Jumlah Harga Bahan 22,067.16
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang besi Oh 0.050 74,788.75 3,739.44
- Kepala tukang Oh 0.005 86,105.63 430.53
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 14,473.20
Jumlah Total 36,540.36
Dibulatkan 36,540.00
17. Pasang glasswool tiap 1m²
Harga bahan:
- Glasswool BG 50 m² 1.050 19,306.75 20,272.09
Jumlah Harga Bahan 20,272.09
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang besi Oh 0.050 74,788.75 3,739.44
- Kepala tukang Oh 0.005 86,105.63 430.53
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 14,473.20
Jumlah Total 34,745.29
Dibulatkan 34,740.00
18. Pasang Nok genteng plentong tiap 1m'
Harga bahan:
- Nok genteng plentong kecil natural bh 5.000 4,017.85 20,089.26
- Semen portland kg 8.000 1,521.52 12,172.16
- Pasir pasang m³ 0.032 355,680.00 11,381.76
Jumlah Harga Bahan 43,643.18
Upah tenaga:
- Pekerja Oh 0.400 63,492.89 25,397.16
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.002 97,412.42 194.82
Jumlah Upah Tenaga 42,271.84
Jumlah Total 85,915.03
Dibulatkan 85,910.00
19. Pasang Nok genteng plentong besar tiap 1m'
Harga bahan:
- Nok genteng plentong super/besar bh 4.000 5,433.61 21,734.43
- Semen portland kg 9.600 1,521.52 14,606.59
- Pasir pasang m³ 0.038 355,680.00 13,658.11
Jumlah Harga Bahan 49,999.14
Upah tenaga:
- Pekerja Oh 0.400 63,492.89 25,397.16
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.002 97,412.42 194.82
Jumlah Upah Tenaga 42,271.84
Jumlah Total 92,270.98
Dibulatkan 92,270.00
20. Pasang Nok genteng keramik Kanmuri tiap 1m'
Harga bahan:
- Nok genteng keramik Kanmuri natural bh 3.500 12,499.03 43,746.59
- Semen portland kg 9.600 1,521.52 14,606.59
- Pasir pasang m³ 0.038 355,680.00 13,658.11
Jumlah Harga Bahan 72,011.30
Upah tenaga:
- Pekerja Oh 0.400 63,492.89 25,397.16
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.002 97,412.42 194.82
Jumlah Upah Tenaga 42,271.84
Jumlah Total 114,283.14
Dibulatkan 114,280.00
21. Pasang Nok genteng keramik M Class tiap 1m'
Harga bahan:
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Nok genteng keramik M Class bh 4.000 12,520.24 50,080.96
- Semen portland kg 9.600 1,521.52 14,606.59
- Pasir pasang m³ 0.038 355,680.00 13,658.11
Jumlah Harga Bahan 78,345.66
Upah tenaga:
- Pekerja Oh 0.400 63,492.89 25,397.16
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.002 97,412.42 194.82
Jumlah Upah Tenaga 42,271.84
Jumlah Total 120,617.50
Dibulatkan 120,610.00
22. Pasang Nok genteng beton tiap 1m'
Harga bahan:
- Nok genteng beton Monier standar bh 3.500 12,403.18 43,411.12
- Paku biasa 2"-5" kg 0.050 20,748.00 1,037.40
- Semen portland kg 10.800 1,521.52 16,432.42
- Pasir pasang m³ 0.032 355,680.00 11,381.76
- Semen warna kg 1.000 2,521.96 2,521.96
Jumlah Harga Bahan 74,784.65
Upah tenaga:
- Pekerja Oh 0.400 63,492.89 25,397.16
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.002 97,412.42 194.82
Jumlah Upah Tenaga 42,271.84
Jumlah Total 117,056.50
Dibulatkan 117,050.00
23. Pasang nok genteng metal tiap 1m'
Harga bahan:
- Nok genteng metal bh 1.100 38,565.57 42,422.13
- Paku biasa 1/2"- 1" kg 0.050 25,688.00 1,284.40
Jumlah Harga Bahan 43,706.53
Upah tenaga:
- Pekerja Oh 0.250 63,492.89 15,873.22
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 29,649.48
Jumlah Total 73,356.01
Dibulatkan 73,350.00
24. Pasang nok tepi tiap 1 m'
Harga bahan:
- Nok tepi bh 1.100 48,450.00 53,295.00
- Paku biasa 1/2"- 1" kg 0.050 25,688.00 1,284.40
Jumlah Harga Bahan 54,579.40
Upah tenaga:
- Pekerja Oh 0.250 63,492.89 15,873.22
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 29,649.48
Jumlah Total 84,228.88
Dibulatkan 84,220.00
25. Pasang nok/bubung stel gelombang 0,92 m tiap 1m'
Harga bahan:
- Nok stel gelombang lbr 2.400 33,835.92 81,206.20
- Paku sekrup 3,5" bh 6.000 9,810.51 58,863.04
Jumlah Harga Bahan 140,069.24
Upah tenaga:
- Pekerja Oh 0.084 63,492.89 5,333.40
- Tukang kayu Oh 0.125 74,788.75 9,348.59
- Kepala tukang Oh 0.013 86,105.63 1,119.37
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 16,191.02
Jumlah Total 156,260.26
Dibulatkan 156,260.00
26. Pasang nok paten 0,92 m tiap 1m'
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Harga bahan:
- Nok paten lbr 1.200 31,734.28 38,081.14
- Paku sekrup 3,5" bh 6.000 9,810.51 58,863.04
Jumlah Harga Bahan 96,944.18
Upah tenaga:
- Pekerja Oh 0.084 63,492.89 5,333.40
- Tukang kayu Oh 0.125 74,788.75 9,348.59
- Kepala tukang Oh 0.013 86,105.63 1,119.37
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 16,191.02
Jumlah Total 113,135.20
Dibulatkan 113,130.00
27. Pasang nok stel rata 0,92 m tiap 1m'
Harga bahan:
- Nok stel rata lbr 1.100 27,321.24 30,053.37
- Paku sekrup 3,5" bh 6.000 9,810.51 58,863.04
Jumlah Harga Bahan 88,916.41
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.013 86,105.63 1,119.37
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 19,076.62
Jumlah Total 107,993.03
Dibulatkan 107,990.00
28. Pasang atap nok seng tiap 1m'
Harga bahan:
- Seng plat 3x6 ft BJLS 25 (0,25 mm) Lbr 0.300 53,738.98 16,121.69
- Paku biasa 1/2"- 1" kg 0.040 25,688.00 1,027.52
Jumlah Harga Bahan 17,149.21
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang kayu Oh 0.070 74,788.75 5,235.21
- Kepala tukang Oh 0.008 86,105.63 688.85
- Mandor Oh 0.006 97,412.42 584.47
Jumlah Upah Tenaga 16,032.47
Jumlah Total 33,181.68
Dibulatkan 33,180.00
29. Pasang nok asbes tiap 1m'
Harga bahan:
- Nok asbes bh 1.100 23,483.31 25,831.64
- Paku asbes bh 6.000 530.32 3,181.91
Jumlah Harga Bahan 29,013.55
Upah tenaga:
- Pekerja Oh 0.084 63,492.89 5,333.40
- Tukang kayu Oh 0.125 74,788.75 9,348.59
- Kepala tukang Oh 0.013 86,105.63 1,119.37
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 16,191.02
Jumlah Total 45,204.57
Dibulatkan 45,200.00
30. Pasang nok spandek standar tiap 1m' t = 0,45 mm
Harga bahan:
- Nok spandek standar t = 0,45 mm m' 1.100 54,603.20 60,063.52
- angkur pengikat atap kg 0.040 1,257.05 50.28
Jumlah Harga Bahan 60,113.81
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang besi Oh 0.070 74,788.75 5,235.21
- Kepala tukang Oh 0.008 86,105.63 688.85
- Mandor Oh 0.006 97,412.42 584.47
Jumlah Upah Tenaga 16,032.47
Jumlah Total 76,146.27
Dibulatkan 76,140.00
31. Pasang Flashing t = 0,40 mm BMT Colorbond
Harga bahan:
- Flashing t = 0,40 mm BMT Colorbond m' 1.100 47,139.46 51,853.40
- angkur pengikat atap kg 0.100 1,257.05 125.71
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Harga Bahan 51,979.11
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang kayu Oh 0.070 74,788.75 5,235.21
- Kepala tukang Oh 0.008 86,105.63 688.85
- Mandor Oh 0.006 97,412.42 584.47
Jumlah Upah Tenaga 16,032.47
Jumlah Total 68,011.57
Dibulatkan 68,010.00
32. Pasang atap policarbonat tiap 1 m2
Harga bahan:
- Policarbonat m2 1.050 119,152.05 125,109.65
- Besi rangka kg 7.000 11,732.22 82,125.57
- Paku sekrup 3,5" bh 9.000 9,810.51 88,294.56
Jumlah Harga Bahan 295,529.78
Upah tenaga:
- Pekerja Oh 0.500 63,492.89 31,746.44
- Tukang besi Oh 0.500 74,788.75 37,394.38
- Kepala tukang Oh 0.050 86,105.63 4,305.28
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 73,689.63
Jumlah Total 369,219.41
Dibulatkan 369,210.00
L PEKERJAAN SANITASI
1. Memasang 1 buah kloset duduk/monoblok (sederhana)
Harga bahan:
- Seal tape bh 1.000 4,438.97 4,438.97
- Perlengkapan (6% harga kloset) % 6.000 4,438.97 266.34
Jumlah Harga Bahan 4,705.30
Upah tenaga:
- Pekerja Oh 3.300 63,492.89 209,526.53
- Tukang batu Oh 1.100 74,788.75 82,267.63
- Kepala tukang Oh 0.001 86,105.63 86.11
- Mandor Oh 0.160 97,412.42 15,585.99
Jumlah Upah Tenaga 307,466.25
Jumlah Total 312,171.55
Dibulatkan 312,170.00
2. Memasang 1 bh Closet duduk Type C51 / T150 NL Ex Toto setara
Harga bahan:
- Closet duduk Type C51/T150NL Ex Toto setara bh 1.000 2,545,530.62 2,545,530.62
- Perlengkapan (6% harga kloset) % 6.000 2,545,530.62 152,731.84
Jumlah Harga Bahan 2,698,262.46
Upah tenaga:
- Pekerja Oh 3.300 63,492.89 209,526.53
- Tukang batu Oh 1.100 74,788.75 82,267.63
- Kepala tukang Oh 0.001 86,105.63 86.11
- Mandor Oh 0.160 97,412.42 15,585.99
Jumlah Upah Tenaga 307,466.25
Jumlah Total 3,005,728.71
Dibulatkan 3,005,720.00
3. Memasang 1 buah Closet duduk ex Toto Type CW 660 NJ
Harga bahan:
- Closet duduk Type CW 660NJ Ex Toto setara bh 1.000 1,932,717.70 1,932,717.70
- Perlengkapan (6% harga kloset) % 6.000 1,932,717.70 115,963.06
Jumlah Harga Bahan 2,048,680.76
Upah tenaga:
- Pekerja Oh 3.300 63,492.89 209,526.53
- Tukang batu Oh 1.100 74,788.75 82,267.63
- Kepala tukang Oh 0.001 86,105.63 86.11
- Mandor Oh 0.160 97,412.42 15,585.99
Jumlah Upah Tenaga 307,466.25
Jumlah Total 2,356,147.00
Dibulatkan 2,356,140.00
4. Memasang 1 buah kloset jongkok ex Toto Type CE 6
Harga bahan:
- Closet jongkok Type CE6 Ex Toto setara bh 1.000 360,616.84 360,616.84
- Semen portland kg 6.000 1,521.52 9,129.12
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pasir pasang m³ 0.010 355,680.00 3,556.80
Jumlah Harga Bahan 373,302.76
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang batu Oh 1.500 74,788.75 112,183.13
- Kepala tukang Oh 0.150 86,105.63 12,915.84
- Mandor Oh 0.160 97,412.42 15,585.99
Jumlah Upah Tenaga 204,177.84
Jumlah Total 577,480.60
Dibulatkan 577,480.00
5. Memasang 1 buah kloset jongkok ex Toto Type CE 7
Harga bahan:
- Closet jongkok Type CE7 Ex Toto setara bh 1.000 219,984.13 219,984.13
- Semen portland kg 6.000 1,521.52 9,129.12
- Pasir pasang m³ 0.010 355,680.00 3,556.80
Jumlah Harga Bahan 232,670.05
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang batu Oh 1.500 74,788.75 112,183.13
- Kepala tukang Oh 0.150 86,105.63 12,915.84
- Mandor Oh 0.160 97,412.42 15,585.99
Jumlah Upah Tenaga 204,177.84
Jumlah Total 436,847.89
Dibulatkan 436,840.00
6. Memasang 1 buah kloset jongkok ex Toto Type CE9 / TV 150 NWV 12J
Harga bahan:
- Closet jongkok Type CE9 / TV 150 NWV12J Ex Toto setara bh 1.000 2,490,534.59 2,490,534.59
- Semen portland kg 6.000 1,521.52 9,129.12
- Pasir pasang m³ 0.010 355,680.00 3,556.80
Jumlah Harga Bahan 2,503,220.51
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang batu Oh 1.500 74,788.75 112,183.13
- Kepala tukang Oh 0.150 86,105.63 12,915.84
- Mandor Oh 0.160 97,412.42 15,585.99
Jumlah Upah Tenaga 204,177.84
Jumlah Total 2,707,398.36
Dibulatkan 2,707,390.00
7. Memasang 1 buah urinoir ex Toto Type U 57M
Harga bahan:
- Urinoir lengkap Type U57M Ex Toto setara bh 1.000 1,909,147.97 1,909,147.97
- Perlengkapan (30% harga urinoir) % 30.000 1,909,147.97 572,744.39
- Semen portland kg 6.000 1,521.52 9,129.12
- Pasir pasang m³ 0.010 355,680.00 3,556.80
Jumlah Harga Bahan 2,494,578.28
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang batu Oh 1.000 74,788.75 74,788.75
- Kepala tukang Oh 0.100 86,105.63 8,610.56
- Mandor Oh 0.100 97,412.42 9,741.24
Jumlah Upah Tenaga 156,633.44
Jumlah Total 2,651,211.72
Dibulatkan 2,651,210.00
8. Memasang 1 buah penyekat urinoir ex Toto Type A 100
Harga bahan:
- Penyekat Urinoir lengkap Type A 100 Ex Toto setara bh 1.000 927,075.97 927,075.97
- Perlengkapan (30% harga penyekat urinoir) % 30.000 927,075.97 278,122.79
- Semen portland kg 6.000 1,521.52 9,129.12
- Pasir pasang m³ 0.010 355,680.00 3,556.80
Jumlah Harga Bahan 1,217,884.68
Upah tenaga:
- Pekerja Oh 1.000 63,492.89 63,492.89
- Tukang batu Oh 1.000 74,788.75 74,788.75
- Kepala tukang Oh 0.100 86,105.63 8,610.56
- Mandor Oh 0.100 97,412.42 9,741.24
Jumlah Upah Tenaga 156,633.44
Jumlah Total 1,374,518.12
Dibulatkan 1,374,510.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
9. Memasang 1 buah wastafel ex Toto lengkap ( Type LW 533 J ) Bulat
Harga bahan:
- Wastafel lengkap Type LW 533 J Ex Toto setara ( Lengkap + bh 1.000 2,747,444.63 2,747,444.63
- Perlengkapan (12% harga wastafel) % 12.000 2,747,444.63 329,693.36
- Semen portland kg 6.000 1,521.52 9,129.12
- Pasir pasang m³ 0.010 355,680.00 3,556.80
Jumlah Harga Bahan 3,089,823.90
Upah tenaga:
- Pekerja Oh 1.200 63,492.89 76,191.47
- Tukang batu Oh 1.450 74,788.75 108,443.69
- Kepala tukang Oh 0.150 86,105.63 12,915.84
- Mandor Oh 0.100 97,412.42 9,741.24
Jumlah Upah Tenaga 207,292.24
Jumlah Total 3,297,116.14
Dibulatkan 3,297,110.00
10. Memasang 1 buah wastafel ex Toto lengkap ( Type L 521 V1A ) Bulat
Harga bahan:
- Wastafel lengkap Type L 521 V1A Ex Toto setara ( Lengkap bh 1.000 1,755,944.74 1,755,944.74
- Perlengkapan (12% harga wastafel) % 12.000 1,755,944.74 210,713.37
- Semen portland kg 6.000 1,521.52 9,129.12
- Pasir pasang m³ 0.010 355,680.00 3,556.80
Jumlah Harga Bahan 1,979,344.02
Upah tenaga:
- Pekerja Oh 1.200 63,492.89 76,191.47
- Tukang batu Oh 1.450 74,788.75 108,443.69
- Kepala tukang Oh 0.150 86,105.63 12,915.84
- Mandor Oh 0.100 97,412.42 9,741.24
Jumlah Upah Tenaga 207,292.24
Jumlah Total 2,186,636.26
Dibulatkan 2,186,630.00
11. Bathub Type FB 1700 - 70 + Kran Type TX 432 SJN ex Toto - setara
Harga bahan:
- Bathub Type FB 1700 - 70 + Kran Type TX 432 SJN ex Toto - bh 1.000 4,588,240.38 4,588,240.38
- Perlengkapan (10% harga bak) % 10.000 4,588,240.38 458,824.04
Jumlah Harga Bahan 5,047,064.42
Upah tenaga:
- Pekerja Oh 1.800 63,492.89 114,287.20
- Tukang batu Oh 2.700 74,788.75 201,929.63
- Kepala tukang Oh 0.540 86,105.63 46,497.04
- Mandor Oh 0.110 97,412.42 10,715.37
Jumlah Upah Tenaga 373,429.23
Jumlah Total 5,420,493.65
Dibulatkan 5,420,490.00
12. Memasang 1 buah bak mandi batu bata volume 0,3 m³
Harga bahan:
- Bata merah bh 242.000 1,976.00 478,192.00
- Semen portland kg 120.000 1,521.52 182,582.40
- Pasir pasang m³ 0.300 355,680.00 106,704.00
- Ubin keramik 20 x 20 cm Roman ( Type G227058 Venere Cre bh 110.000 6,736.36 741,000.00
- Semen warna kg 6.000 2,521.96 15,131.77
Jumlah Harga Bahan 1,523,610.17
Upah tenaga:
- Pekerja Oh 6.000 63,492.89 380,957.33
- Tukang batu Oh 3.000 74,788.75 224,366.25
- Kepala tukang Oh 0.300 86,105.63 25,831.69
- Mandor Oh 0.300 97,412.42 29,223.73
Jumlah Upah Tenaga 660,378.99
Jumlah Total 2,183,989.16
Dibulatkan 2,183,980.00
13. Memasang 1 buah bak mandi Fibreglass volume 0,3 m³
Harga bahan:
- Bak Mandi Fibreglass bh 1.000 231,179.75 231,179.75
Jumlah Harga Bahan 231,179.75
Upah tenaga:
- Pekerja Oh 1.800 63,492.89 114,287.20
- Tukang batu Oh 2.700 74,788.75 201,929.63
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Kepala tukang Oh 0.540 86,105.63 46,497.04
- Mandor Oh 0.110 97,412.42 10,715.37
Jumlah Upah Tenaga 373,429.23
Jumlah Total 604,608.98
Dibulatkan 604,600.00
14. Memasang pipa galvanis dia 1/2" tiap m'
Harga bahan:
- Pipa galvanis dia 1/2" m' 1.200 22,724.00 27,268.80
- Perlengkapan (35% harga pipa) % 35.000 27,268.80 9,544.08
Jumlah Harga Bahan 36,812.88
Upah tenaga:
- Pekerja Oh 0.054 63,492.89 3,428.62
- Tukang pasang pipa Oh 0.090 63,492.89 5,714.36
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.027 97,412.42 2,630.14
Jumlah Upah Tenaga 12,548.06
Jumlah Total 49,360.94
Dibulatkan 49,360.00
15. Memasang pipa galvanis dia 3/4" tiap m'
Harga bahan:
- Pipa galvanis dia 3/4" m' 1.200 30,792.67 36,951.20
- Perlengkapan (35% harga pipa) % 35.000 36,951.20 12,932.92
Jumlah Harga Bahan 49,884.12
Upah tenaga:
- Pekerja Oh 0.054 63,492.89 3,428.62
- Tukang pasang pipa Oh 0.090 63,492.89 5,714.36
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.027 97,412.42 2,630.14
Jumlah Upah Tenaga 12,548.06
Jumlah Total 62,432.18
Dibulatkan 62,430.00
16. Memasang pipa galvanis dia 1" tiap m'
Harga bahan:
- Pipa galvanis dia 1" m' 1.200 35,074.00 42,088.80
- Perlengkapan (35% harga pipa) % 35.000 42,088.80 14,731.08
Jumlah Harga Bahan 56,819.88
Upah tenaga:
- Pekerja Oh 0.054 63,492.89 3,428.62
- Tukang pasang pipa Oh 0.090 63,492.89 5,714.36
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.027 97,412.42 2,630.14
Jumlah Upah Tenaga 12,548.06
Jumlah Total 69,367.94
Dibulatkan 69,360.00
17. Memasang pipa galvanis dia 1 ¼" tiap m'
Harga bahan:
- Pipa galvanis dia 1 ¼" m' 1.200 22,263.31 26,715.97
- Perlengkapan (35% harga pipa) % 35.000 26,715.97 9,350.59
Jumlah Harga Bahan 36,066.56
Upah tenaga:
- Pekerja Oh 0.054 63,492.89 3,428.62
- Tukang pasang pipa Oh 0.090 63,492.89 5,714.36
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.003 97,412.42 263.01
Jumlah Upah Tenaga 10,180.94
Jumlah Total 46,247.50
Dibulatkan 46,240.00
18. Memasang pipa galvanis dia 1 ½" tiap m'
Harga bahan:
- Pipa galvanis dia 1 ½" m' 1.200 22,263.31 26,715.97
- Perlengkapan (35% harga pipa) % 35.000 26,715.97 9,350.59
Jumlah Harga Bahan 36,066.56
Upah tenaga:
- Pekerja Oh 0.108 63,492.89 6,857.23
- Tukang pasang pipa Oh 0.180 63,492.89 11,428.72
- Kepala tukang Oh 0.018 86,105.63 1,549.90
- Mandor Oh 0.005 97,412.42 526.03
Jumlah Upah Tenaga 20,361.88
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Total 56,428.44
Dibulatkan 56,420.00
19. Memasang pipa galvanis dia 2" tiap m'
Harga bahan:
- Pipa galvanis dia 2" m' 1.200 67,019.33 80,423.20
- Perlengkapan (35% harga pipa) % 35.000 80,423.20 28,148.12
Jumlah Harga Bahan 108,571.32
Upah tenaga:
- Pekerja Oh 0.108 63,492.89 6,857.23
- Tukang pasang pipa Oh 0.180 63,492.89 11,428.72
- Kepala tukang Oh 0.018 86,105.63 1,549.90
- Mandor Oh 0.005 97,412.42 526.03
Jumlah Upah Tenaga 20,361.88
Jumlah Total 128,933.20
Dibulatkan 128,930.00
20. Memasang pipa galvanis dia 2 ½" tiap m'
Harga bahan:
- Pipa galvanis dia 2 ½" m' 1.200 24,140.77 28,968.92
- Perlengkapan (35% harga pipa) % 35.000 28,968.92 10,139.12
Jumlah Harga Bahan 39,108.05
Upah tenaga:
- Pekerja Oh 0.108 63,492.89 6,857.23
- Tukang pasang pipa Oh 0.180 63,492.89 11,428.72
- Kepala tukang Oh 0.018 86,105.63 1,549.90
- Mandor Oh 0.005 97,412.42 526.03
Jumlah Upah Tenaga 20,361.88
Jumlah Total 59,469.93
Dibulatkan 59,460.00
21. Memasang pipa galvanis dia 3" tiap m'
Harga bahan:
- Pipa galvanis dia 3" m' 1.200 25,051.48 30,061.77
- Perlengkapan (35% harga pipa) % 35.000 30,061.77 10,521.62
Jumlah Harga Bahan 40,583.39
Upah tenaga:
- Pekerja Oh 0.135 63,492.89 8,571.54
- Tukang pasang pipa Oh 0.225 63,492.89 14,285.90
- Kepala tukang Oh 0.023 86,105.63 1,980.43
- Mandor Oh 0.007 97,412.42 681.89
Jumlah Upah Tenaga 25,519.76
Jumlah Total 66,103.15
Dibulatkan 66,100.00
22. Memasang pipa galvanis dia 4" tiap m'
Harga bahan:
- Pipa galvanis dia 4" m' 1.200 201,756.87 242,108.25
- Perlengkapan (35% harga pipa) % 35.000 242,108.25 84,737.89
Jumlah Harga Bahan 326,846.13
Upah tenaga:
- Pekerja Oh 0.135 63,492.89 8,571.54
- Tukang pasang pipa Oh 0.225 63,492.89 14,285.90
- Kepala tukang Oh 0.023 86,105.63 1,937.38
- Mandor Oh 0.007 97,412.42 662.40
Jumlah Upah Tenaga 25,457.22
Jumlah Total 352,303.35
Dibulatkan 352,300.00
23. Memasang pipa PVC tipe AW dia 1/2" tiap m'
Harga bahan:
- Pipa PVC dia 1/2" AW m' 1.200 7,080.67 8,496.80
- Perlengkapan (35% harga pipa) % 35.000 8,496.80 2,973.88
Jumlah Harga Bahan 11,470.68
Upah tenaga:
- Pekerja Oh 0.036 63,492.89 2,285.74
- Tukang pasang pipa Oh 0.060 63,492.89 3,809.57
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.002 97,412.42 175.34
Jumlah Upah Tenaga 6,787.29
Jumlah Total 18,257.97
Dibulatkan 18,250.00
24. Memasang pipa PVC tipe AW dia 3/4" tiap m'
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Harga bahan:
- Pipa PVC dia 3/4" AW m' 1.200 5,723.45 6,868.14
- Perlengkapan (35% harga pipa) % 35.000 6,868.14 2,403.85
Jumlah Harga Bahan 9,271.99
Upah tenaga:
- Pekerja Oh 0.036 63,492.89 2,285.74
- Tukang pasang pipa Oh 0.060 63,492.89 3,809.57
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.002 97,412.42 175.34
Jumlah Upah Tenaga 6,787.29
Jumlah Total 16,059.28
Dibulatkan 16,050.00
25. Memasang pipa PVC tipe AW dia 1" tiap m'
Harga bahan:
- Pipa PVC dia 1" AW m' 1.200 7,574.67 9,089.60
- Perlengkapan (35% harga pipa) % 35.000 9,089.60 3,181.36
Jumlah Harga Bahan 12,270.96
Upah tenaga:
- Pekerja Oh 0.036 63,492.89 2,285.74
- Tukang pasang pipa Oh 0.060 63,492.89 3,809.57
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.002 97,412.42 175.34
Jumlah Upah Tenaga 6,787.29
Jumlah Total 19,058.25
Dibulatkan 19,050.00
26. Memasang pipa PVC tipe AW dia 1 ¼" tiap m'
Harga bahan:
- Pipa PVC dia 1 ¼" AW m' 1.200 10,052.82 12,063.38
- Perlengkapan (35% harga pipa) % 35.000 12,063.38 4,222.18
Jumlah Harga Bahan 16,285.56
Upah tenaga:
- Pekerja Oh 0.036 63,492.89 2,285.74
- Tukang pasang pipa Oh 0.060 63,492.89 3,809.57
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.002 97,412.42 175.34
Jumlah Upah Tenaga 6,787.29
Jumlah Total 23,072.86
Dibulatkan 23,070.00
27. Memasang pipa PVC tipe D dia 1 ¼" tiap m'
Harga bahan:
- Pipa PVC dia 1 ¼" D m' 1.200 5,026.41 6,031.69
- Perlengkapan (35% harga pipa) % 35.000 6,031.69 2,111.09
Jumlah Harga Bahan 8,142.78
Upah tenaga:
- Pekerja Oh 0.036 63,492.89 2,285.74
- Tukang pasang pipa Oh 0.060 63,492.89 3,809.57
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.002 97,412.42 175.34
Jumlah Upah Tenaga 6,787.29
Jumlah Total 14,930.07
Dibulatkan 14,930.00
28. Memasang pipa PVC tipe AW dia 1 ½" tiap m'
Harga bahan:
- Pipa PVC dia 1 ½" AW m' 1.200 10,052.82 12,063.38
- Perlengkapan (35% harga pipa) % 35.000 12,063.38 4,222.18
Jumlah Harga Bahan 16,285.56
Upah tenaga:
- Pekerja Oh 0.036 63,492.89 2,285.74
- Tukang pasang pipa Oh 0.060 63,492.89 3,809.57
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.002 97,412.42 175.34
Jumlah Upah Tenaga 6,787.29
Jumlah Total 23,072.86
Dibulatkan 23,070.00
29. Memasang pipa PVC tipe D dia 1 ½" tiap m'
Harga bahan:
- Pipa PVC dia 1 ½" D m' 1.200 5,026.41 6,031.69
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Perlengkapan (35% harga pipa) % 35.000 6,031.69 2,111.09
Jumlah Harga Bahan 8,142.78
Upah tenaga:
- Pekerja Oh 0.036 63,492.89 2,285.74
- Tukang pasang pipa Oh 0.060 63,492.89 3,809.57
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.002 97,412.42 175.34
Jumlah Upah Tenaga 6,787.29
Jumlah Total 14,930.07
Dibulatkan 14,930.00
30. Memasang pipa PVC tipe AW dia 2" tiap m'
Harga bahan:
- Pipa PVC dia 2" AW m' 1.200 21,736.00 26,083.20
- Perlengkapan (35% harga pipa) % 35.000 26,083.20 9,129.12
Jumlah Harga Bahan 35,212.32
Upah tenaga:
- Pekerja Oh 0.054 63,492.89 3,428.62
- Tukang pasang pipa Oh 0.090 63,492.89 5,714.36
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.003 97,412.42 263.01
Jumlah Upah Tenaga 10,180.94
Jumlah Total 45,393.26
Dibulatkan 45,390.00
31. Memasang pipa PVC tipe D dia 2" tiap m'
Harga bahan:
- Pipa PVC dia 2" D m' 1.200 6,129.77 7,355.72
- Perlengkapan (35% harga pipa) % 35.000 7,355.72 2,574.50
Jumlah Harga Bahan 9,930.22
Upah tenaga:
- Pekerja Oh 0.054 63,492.89 3,428.62
- Tukang pasang pipa Oh 0.090 63,492.89 5,714.36
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.003 97,412.42 263.01
Jumlah Upah Tenaga 10,180.94
Jumlah Total 20,111.16
Dibulatkan 20,110.00
32. Memasang pipa PVC tipe AW dia 2 ½" tiap m'
Harga bahan:
- Pipa PVC dia 2 ½" AW m' 1.200 16,392.75 19,671.29
- Perlengkapan (35% harga pipa) % 35.000 19,671.29 6,884.95
Jumlah Harga Bahan 26,556.25
Upah tenaga:
- Pekerja Oh 0.081 63,492.89 5,142.92
- Tukang pasang pipa Oh 0.135 63,492.89 8,571.54
- Kepala tukang Oh 0.014 86,105.63 1,162.43
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 15,266.54
Jumlah Total 41,822.79
Dibulatkan 41,820.00
33. Memasang pipa PVC tipe D dia 2 ½" tiap m'
Harga bahan:
- Pipa PVC dia 2 ½" D m' 1.200 8,959.97 10,751.96
- Perlengkapan (35% harga pipa) % 35.000 10,751.96 3,763.19
Jumlah Harga Bahan 14,515.15
Upah tenaga:
- Pekerja Oh 0.081 63,492.89 5,142.92
- Tukang pasang pipa Oh 0.135 63,492.89 8,571.54
- Kepala tukang Oh 0.014 86,105.63 1,205.48
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 15,309.59
Jumlah Total 29,824.74
Dibulatkan 29,820.00
34. Memasang pipa PVC tipe AW dia 3" cm tiap m'
Harga bahan:
- Pipa PVC dia 3" AW m' 1.200 35,403.33 42,484.00
- Perlengkapan (35% harga pipa) % 35.000 42,484.00 14,869.40
Jumlah Harga Bahan 57,353.40
Upah tenaga:
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pekerja Oh 0.081 63,492.89 5,142.92
- Tukang pasang pipa Oh 0.135 63,492.89 8,571.54
- Kepala tukang Oh 0.014 86,105.63 1,162.43
- Mandor Oh 0.004 97,412.42 399.39
Jumlah Upah Tenaga 15,276.28
Jumlah Total 72,629.68
Dibulatkan 72,620.00
35. Memasang pipa PVC tipe D dia 3" cm tiap m'
Harga bahan:
- Pipa PVC dia 3" D m' 1.200 13,009.11 15,610.94
- Perlengkapan (35% harga pipa) % 35.000 15,610.94 5,463.83
Jumlah Harga Bahan 21,074.77
Upah tenaga:
- Pekerja Oh 0.081 63,492.89 5,142.92
- Tukang pasang pipa Oh 0.135 63,492.89 8,571.54
- Kepala tukang Oh 0.014 86,105.63 1,162.43
- Mandor Oh 0.004 97,412.42 399.39
Jumlah Upah Tenaga 15,276.28
Jumlah Total 36,351.05
Dibulatkan 36,350.00
36. Memasang pipa PVC tipe AW dia 4" tiap m'
Harga bahan:
- Pipa PVC dia 4" AW m' 1.200 52,528.67 63,034.40
- Perlengkapan (35% harga pipa) % 35.000 63,034.40 22,062.04
Jumlah Harga Bahan 85,096.44
Upah tenaga:
- Pekerja Oh 0.081 63,492.89 5,142.92
- Tukang pasang pipa Oh 0.135 63,492.89 8,571.54
- Kepala tukang Oh 0.014 86,105.63 1,162.43
- Mandor Oh 0.004 97,412.42 399.39
Jumlah Upah Tenaga 15,276.28
Jumlah Total 100,372.72
Dibulatkan 100,370.00
37. Memasang pipa PVC tipe D dia 4" tiap m'
Harga bahan:
- Pipa PVC dia 4" D m' 1.200 18,298.23 21,957.87
- Perlengkapan (35% harga pipa) % 35.000 21,957.87 7,685.26
Jumlah Harga Bahan 29,643.13
Upah tenaga:
- Pekerja Oh 0.081 63,492.89 5,142.92
- Tukang pasang pipa Oh 0.135 63,492.89 8,571.54
- Kepala tukang Oh 0.014 86,105.63 1,162.43
- Mandor Oh 0.004 97,412.42 399.39
Jumlah Upah Tenaga 15,276.28
Jumlah Total 44,919.41
Dibulatkan 44,910.00
38. Memasang pipa PVC tipe AW dia 6" tiap m'
Harga bahan:
- Pipa PVC dia 6" AW m' 1.200 63,049.02 75,658.83
- Perlengkapan (35% harga pipa) % 35.000 75,658.83 26,480.59
Jumlah Harga Bahan 102,139.42
Upah tenaga:
- Pekerja Oh 0.081 63,492.89 5,142.92
- Tukang pasang pipa Oh 0.135 63,492.89 8,571.54
- Kepala tukang Oh 0.014 86,105.63 1,162.43
- Mandor Oh 0.004 97,412.42 399.39
Jumlah Upah Tenaga 15,276.28
Jumlah Total 117,415.70
Dibulatkan 117,410.00
39. Memasang pipa PVC tipe D dia 6" tiap m'
Harga bahan:
- Pipa PVC dia 6" D m' 1.200 43,120.42 51,744.51
- Perlengkapan (35% harga pipa) % 35.000 51,744.51 18,110.58
Jumlah Harga Bahan 69,855.09
Upah tenaga:
- Pekerja Oh 0.081 63,492.89 5,142.92
- Tukang pasang pipa Oh 0.135 63,492.89 8,571.54
- Kepala tukang Oh 0.014 86,105.63 1,162.43
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Mandor Oh 0.004 97,412.42 399.39
Jumlah Upah Tenaga 15,276.28
Jumlah Total 85,131.37
Dibulatkan 85,130.00
40. Memasang 1 buah bak cuci piring stainless steel
Harga bahan:
- Bak cuci stainless steel bh 1.000 531,544.00 531,544.00
- Water drain + asesoris set 1.000 84,458.19 84,458.19
Jumlah Harga Bahan 616,002.19
Upah tenaga:
- Pekerja Oh 0.030 63,492.89 1,904.79
- Tukang batu Oh 0.300 74,788.75 22,436.63
- Kepala tukang Oh 0.030 86,105.63 2,583.17
- Mandor Oh 0.002 97,412.42 146.12
Jumlah Upah Tenaga 27,070.70
Jumlah Total 643,072.89
Dibulatkan 643,070.00
41. Memasang 1 buah kran dia 3/4" atau 1/2" ex Toto Type T23B13V7NB
Harga bahan:
- kran dia 3/4" atau 1/2" ex Toto Type T23B13V7NB bh 1.000 190,129.14 190,129.14
- Seal tape bh 0.025 4,438.97 110.97
Jumlah Harga Bahan 190,240.11
Upah tenaga:
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang pasang pipa Oh 0.100 63,492.89 6,349.29
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 8,332.34
Jumlah Total 198,572.45
Dibulatkan 198,570.00
42. Memasang 1 buah kran dia 3/4" atau 1/2" stainless ex Toto Type T23 B13
Harga bahan:
- kran dia 3/4" atau 1/2" stainless ex Toto Type T23 B13 bh 1.000 184,629.54 184,629.54
- Seal tape bh 0.025 4,438.97 110.97
Jumlah Harga Bahan 184,740.51
Upah tenaga:
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang pasang pipa Oh 0.100 63,492.89 6,349.29
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 8,332.34
Jumlah Total 193,072.85
Dibulatkan 193,070.00
43. Memasang 1 buah kran leher angsa stainless ex Toto Type T 30 ARQ 13N
Harga bahan:
- kran leher angsa stainless ex Toto Type T 30 ARQ 13N bh 1.000 394,400.12 394,400.12
- Seal tape bh 0.025 4,438.97 110.97
Jumlah Harga Bahan 394,511.09
Upah tenaga:
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang pasang pipa Oh 0.100 63,492.89 6,349.29
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 8,332.34
Jumlah Total 402,843.43
Dibulatkan 402,840.00
44. Memasang 1 buah kran bebek stainless ex Toto Type T 23BQ 13N
Harga bahan:
- kran bebek stainless ex Toto Type T 23BQ 13N bh 1.000 293,050.28 293,050.28
- Seal tape bh 0.025 4,438.97 110.97
Jumlah Harga Bahan 293,161.26
Upah tenaga:
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang pasang pipa Oh 0.100 63,492.89 6,349.29
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 8,332.34
Jumlah Total 301,493.59
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Dibulatkan 301,490.00
45. Memasang 1 buah hand shower Toto Type TX 402 SP
Harga bahan:
- Hand Shower Toto ( Type TX 402 SP ) bh 1.000 403,828.01 403,828.01
- Seal tape bh 0.025 4,438.97 110.97
Jumlah Harga Bahan 403,938.98
Upah tenaga:
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang pasang pipa Oh 0.100 63,492.89 6,349.29
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 8,332.34
Jumlah Total 412,271.32
Dibulatkan 412,270.00
48. Memasang 1 buah Kran Single Lever Shower Mixer Type TX 450 SD
Harga bahan:
- Kran Single Lever Shower Mixer Type TX 405 SD ex Toto - se bh 1.000 601,028.06 601,028.06
Jumlah Harga Bahan 601,028.06
Upah tenaga:
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 9,461.92
Jumlah Total 610,489.99
Dibulatkan 610,480.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Harga bahan:
- Floor drain stainless Toto ( Type TX 1 BV1N ) bh 1.000 317,405.67 317,405.67
Jumlah Harga Bahan 317,405.67
Upah tenaga:
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 9,461.92
Jumlah Total 326,867.59
Dibulatkan 326,860.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Batu pecah/split 2/3 m³ 0.130 168,355.20 21,886.18
- Besi beton polos kg 11.440 10,868.00 124,329.92
- Kawat beton kg 0.164 30,628.00 5,022.99
- Pasir beton m³ 0.093 355,680.00 33,078.24
- Pasir urug m³ 0.106 78,249.60 8,294.46
- Kayu Terentang balok m³ 0.007 2,479,928.21 17,359.50
- Triplek 4x8 ft 9 mm lbr 0.675 322,088.00 217,409.40
- Paku biasa 2"-5" kg 0.710 20,748.00 14,731.08
- Pipa PVC dia 2" D m' 1.000 6,129.77 6,129.77
- Pipa PVC dia 4" D m' 1.700 18,298.23 31,106.99
- Perlengkapan (35% harga pipa) % 35.000 37,236.75 13,032.86
Jumlah Harga Bahan 1,711,911.08
Upah tenaga:
- Pekerja Oh 5.440 63,492.89 345,401.31
- Tukang batu Oh 2.181 74,788.75 163,114.26
- Tukang pasang pipa Oh 0.320 63,492.89 20,317.72
- Kepala tukang Oh 0.250 86,105.63 21,526.41
- Mandor Oh 0.306 97,412.42 29,759.49
Jumlah Upah Tenaga 580,119.20
Jumlah Total 2,292,030.28
Dibulatkan 2,292,030.00
56. Membuat 1 unit tanki septik kapasitas 1,7x0,85 m dalam 1,3 m (vol. 1,88 m³ u/ 5 pemakai)
Harga bahan:
- Bata merah bh 722.000 1,976.00 1,426,672.00
- Semen portland kg 304.860 1,521.52 463,850.59
- Pasir pasang m³ 0.589 355,680.00 209,495.52
- Batu pecah/split 2/3 m³ 0.200 168,355.20 33,671.04
- Besi beton polos m³ 31.170 10,868.00 338,755.56
- Kawat beton kg 0.445 30,628.00 13,629.46
- Pasir beton m³ 0.134 355,680.00 47,661.12
- Pasir urug m³ 0.138 78,249.60 10,798.44
- Kayu Terentang balok m³ 0.043 2,479,928.21 105,892.93
- Triplek 4x8 ft 9 mm lbr 0.800 322,088.00 257,670.40
- Paku biasa 2"-5" kg 0.920 20,748.00 19,088.16
- Pipa PVC dia 2" D m' 3.000 6,129.77 18,389.30
- Pipa PVC dia 4" D m' 1.700 18,298.23 31,106.99
- Perlengkapan (35% harga pipa) % 35.000 49,496.28 17,323.70
Jumlah Harga Bahan 2,994,005.21
Upah tenaga:
- Pekerja Oh 8.648 63,492.89 549,086.49
- Tukang batu Oh 3.486 74,788.75 260,713.58
- Tukang pasang pipa Oh 0.500 63,492.89 31,746.44
- Kepala tukang Oh 0.399 86,105.63 34,356.15
- Mandor Oh 0.482 97,412.42 46,952.79
Jumlah Upah Tenaga 922,855.45
Jumlah Total 3,916,860.66
Dibulatkan 3,916,860.00
57. Membuat tanki septik kapasitas tiap 1 m³
Harga bahan:
- Bata merah bh 385.000 1,976.00 760,760.00
- Semen portland kg 162.290 1,521.52 246,927.48
- Pasir pasang m³ 0.314 355,680.00 111,683.52
- Batu pecah/split 2/3 m³ 0.107 168,355.20 18,014.01
- Besi beton polos m³ 16.594 10,868.00 180,343.59
- Kawat beton kg 0.237 30,628.00 7,258.84
- Pasir beton m³ 0.072 355,680.00 25,608.96
- Pasir urug m³ 0.074 78,249.60 5,790.47
- Kayu Terentang balok m³ 0.023 2,479,928.21 57,038.35
- Triplek 4x8 ft 9 mm lbr 0.426 322,088.00 137,209.49
- Paku biasa 2"-5" kg 0.490 20,748.00 10,166.52
- Pipa PVC dia 2" D m' 1.600 6,129.77 9,807.63
- Pipa PVC dia 4" D m' 0.910 18,298.23 16,651.39
- Perlengkapan (35% harga pipa) % 35.000 26,459.01 9,260.65
Jumlah Harga Bahan 1,596,520.89
Upah tenaga:
- Pekerja Oh 4.604 63,492.89 292,321.25
- Tukang batu Oh 1.856 74,788.75 138,807.92
- Tukang pasang pipa Oh 0.267 63,492.89 16,952.60
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Kepala tukang Oh 0.213 86,105.63 18,340.50
- Mandor Oh 0.257 97,412.42 25,034.99
Jumlah Upah Tenaga 491,457.27
Jumlah Total 2,087,978.16
Dibulatkan 2,087,970.00
58. Membuat 1 unit resapan Ø 0,8 m (digali 1 m) dalam 1 m (digali 1,9 m) kap. 0,5 m³
Harga bahan:
- Batu pecah/split 3/5 m³ 0.603 147,014.40 88,649.68
- Ijuk kg 0.716 6,206.70 4,443.99
- Pipa PVC dia 4" D m' 2.000 18,298.23 36,596.45
Jumlah Harga Bahan 129,690.13
Upah tenaga:
- Pekerja Oh 1.050 63,492.89 66,667.53
- Tukang pasang pipa Oh 0.270 63,492.89 17,143.08
- Kepala tukang Oh 0.027 86,105.63 2,324.85
- Mandor Oh 0.097 97,412.42 9,439.26
Jumlah Upah Tenaga 95,574.73
Jumlah Total 225,264.86
Dibulatkan 225,260.00
59. Memasang 1 unit septictank Biotec kap. 1 m³
Harga bahan:
- Septic tank Biotec kap. 1 m3 bh 1.000 3,016,728.77 3,016,728.77
- Pasir urug m³ 0.133 78,249.60 10,390.43
- Galian tanah m³ 2.310 61,520.00 142,111.20
Jumlah Harga Bahan 3,169,230.40
Upah tenaga:
- Pekerja Oh 1.200 63,492.89 76,191.47
- Mandor Oh 0.550 97,412.42 53,576.83
Jumlah Upah Tenaga 129,768.30
Jumlah Total 3,298,998.70
Dibulatkan 3,298,990.00
60. Memasang 1 unit septictank Biotec kap. 2 m³
Harga bahan:
- Septic tank Biotec kap. 2 m3 m³ 1.000 5,978,173.17 5,978,173.17
- Pasir urug kg 0.150 78,249.60 11,708.60
- Galian tanah m³ 4.023 66,610.08 267,962.86
Jumlah Harga Bahan 6,257,844.63
Upah tenaga:
- Pekerja Oh 1.200 63,492.89 76,191.47
- Mandor Oh 0.550 97,412.42 53,576.83
Jumlah Upah Tenaga 129,768.30
Jumlah Total 6,387,612.92
Dibulatkan 6,387,610.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Tukang las Oh 0.060 74,788.75 4,487.33
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.003 97,412.42 292.24
Jumlah Upah Tenaga 9,105.77
Jumlah Total 20,854.70
Dibulatkan 20,850.00
2. Pasang Rangka Atap Baja tiap kg
Harga bahan:
- Besi baja WF kg 1.150 10,216.46 11,748.93
Jumlah Harga Bahan 11,748.93
Upah tenaga:
- Pekerja Oh 0.060 63,492.89 3,809.57
- Tukang las Oh 0.060 74,788.75 4,487.33
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.003 97,412.42 292.24
Jumlah Upah Tenaga 9,105.77
Jumlah Total 20,854.70
Dibulatkan 20,850.00
3. Kuda-kuda baja dengan WF / kg
Harga bahan:
- Besi baja WF kg 1.100 10,216.46 11,238.11
- Generator 125 Kva unit 0.002 133,307,238.94 266,614.48
- Travo las unit 0.002 1,652,198.65 3,304.40
- Mesin gurinda unit 0.001 414,041.56 414.04
- Mesin bor unit 0.001 485,418.55 485.42
- Mata gerinda bh 0.003 8,157.48 24.47
- Mata bor bh 0.003 31,321.03 93.96
- Kawat Las listrik kg 0.003 21,016.34 63.05
Jumlah Harga Bahan 282,237.93
Upah buat:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang besi konstruksi Oh 0.020 74,788.75 1,495.78
- Mandor Oh 0.007 97,412.42 681.89
Jumlah Upah Buat 3,447.52
Upah erection:
- Transport kg 1.000 28,223.79 28,223.79
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang besi konstruksi Oh 0.005 74,788.75 373.94
- Mandor Oh 0.002 97,412.42 194.82
Jumlah Upah Erection 29,427.49
Jumlah Total 315,112.94
Dibulatkan 315,110.00
4. Kuda-kuda baja dengan siku / kg
Harga bahan:
- Besi siku kg 1.100 13,832.00 15,215.20
- Generator 125 Kva unit 0.002 133,307,238.94 266,614.48
- Travo las unit 0.002 1,652,198.65 3,304.40
- Mesin gurinda unit 0.001 414,041.56 414.04
- Mesin bor unit 0.001 485,418.55 485.42
- Mata gerinda bh 0.003 8,157.48 24.47
- Mata bor bh 0.003 31,321.03 93.96
- Kawat Las listrik kg 0.003 21,016.34 63.05
Jumlah Harga Bahan 286,215.02
Upah buat:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang besi konstruksi Oh 0.020 74,788.75 1,495.78
- Mandor Oh 0.007 97,412.42 681.89
Jumlah Upah Buat 3,447.52
Upah erection:
- Transport kg 1.000 28,621.50 28,621.50
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang besi konstruksi Oh 0.005 74,788.75 373.94
- Mandor Oh 0.002 97,412.42 194.82
Jumlah Upah Erection 29,825.20
Jumlah Total 319,487.74
Dibulatkan 319,480.00
5. Gording baja CNP / Kg
Harga bahan:
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Baja CNP kg 1.100 10,789.79 11,868.77
- Generator 125 Kva unit 0.002 133,307,238.94 266,614.48
- Travo las unit 0.002 1,652,198.65 3,304.40
- Mesin gurinda unit 0.001 414,041.56 414.04
- Mesin bor unit 0.001 485,418.55 485.42
- Mata gerinda bh 0.003 8,157.48 24.47
- Mata bor bh 0.003 31,321.03 93.96
- Baut dia 12 mm - 1" bh 0.250 4,871.08 1,217.77
Jumlah Harga Bahan 284,023.31
Upah buat:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang besi konstruksi Oh 0.020 74,788.75 1,495.78
- Mandor Oh 0.007 97,412.42 681.89
Jumlah Upah Buat 3,447.52
Upah erection:
- Transport kg 1.000 28,402.33 28,402.33
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang besi konstruksi Oh 0.005 74,788.75 373.94
- Mandor Oh 0.002 97,412.42 194.82
Jumlah Upah Erection 29,606.03
Jumlah Total 317,076.86
Dibulatkan 317,070.00
3. Pengelasan Las Listrik setiap 1 cm
Harga bahan:
- Kawat las listrik kg 0.040 21,016.34 840.65
- Solar ltr 0.030 8,892.00 266.76
- Pelumas ltr 0.004 33,626.15 134.50
Jumlah Harga Bahan 1,241.92
Upah tenaga:
- Pekerja Oh 0.004 63,492.89 253.97
- Tukang las Oh 0.002 74,788.75 149.58
- Kepala tukang Oh 0.000 86,105.63 17.22
- Mandor Oh 0.000 97,412.42 19.48
Jumlah Upah Tenaga 440.25
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- cat besi glotex m2 0.50000 45,571.03 22,785.52
- pasang grill besi bh 1.00000 5,000.00 5,000.00
- alat bantu ls 1.00000 2,800.00 2,800.00
Jumlah Total 330,585.52
Dibulatkan 330,580.00
7. Pasang pintu lipat tiap m² (Folding Door)
Harga bahan:
- Pintu lipat m² 1.000 358,731.26 358,731.26
Jumlah Harga Bahan 358,731.26
Upah tenaga:
- Pekerja Oh 0.440 63,492.89 27,936.87
- Tukang besi Oh 0.440 74,788.75 32,907.05
- Kepala tukang Oh 0.044 86,105.63 3,788.65
- Mandor Oh 0.022 97,412.42 2,143.07
Jumlah Upah Tenaga 66,775.64
Jumlah Total 425,506.90
Dibulatkan 425,500.00
8. Pasang rolling door tiap m² ( Besi )
Harga bahan:
- Roll door m² 1.000 785,657.60 785,657.60
Jumlah Harga Bahan 785,657.60
Upah tenaga:
- Pekerja Oh 1.200 63,492.89 76,191.47
- Tukang besi Oh 1.200 74,788.75 89,746.50
- Kepala tukang Oh 0.120 86,105.63 10,332.68
- Mandor Oh 0.006 97,412.42 584.47
Jumlah Upah Tenaga 176,855.12
Jumlah Total 962,512.72
Dibulatkan 962,510.00
9. Pasang kusen pintu aluminium tiap m'
Harga bahan:
- Profil Allumunium Kusen Coklat m' 1.100 65,360.82 71,896.90
- Skrup fixer bh 2.000 996.21 1,992.43
- Sealant tube 0.060 9,873.75 592.43
Jumlah Harga Bahan 74,481.75
Upah tenaga:
- Pekerja Oh 0.043 63,492.89 2,730.19
- Tukang besi konstruksi Oh 0.043 74,788.75 3,215.92
- Kepala tukang Oh 0.004 86,105.63 370.25
- Mandor Oh 0.002 97,412.42 204.57
Jumlah Upah Tenaga 6,520.93
Jumlah Total 81,002.69
Dibulatkan 81,000.00
10 Pasang kusen jendela aluminium tiap m'
Harga bahan:
- Profil Allumunium Rangka Natural m' 1.100 87,863.23 96,649.56
- Skrup fixer bh 2.000 996.21 1,992.43
- Sealant tube 0.060 9,873.75 592.43
Jumlah Harga Bahan 99,234.41
Upah tenaga:
- Pekerja Oh 0.043 63,492.89 2,730.19
- Tukang besi konstruksi Oh 0.043 74,788.75 3,215.92
- Kepala tukang Oh 0.004 86,105.63 370.25
- Mandor Oh 0.002 97,412.42 204.57
Jumlah Upah Tenaga 6,520.93
Jumlah Total 105,755.34
Dibulatkan 105,750.00
11. Memasang 1 m² pintu/jendela/BV kaca, rangka allumunium
Harga bahan:
- Profil Allumunium Rangka Natural m' 4.400 87,863.23 386,598.22
- Kaca polos 5 mm m2 1.050 107,390.00 112,759.50
- Sealant tube 0.270 9,873.75 2,665.91
Jumlah Harga Bahan 502,023.63
Upah tenaga:
- Pekerja Oh 0.085 63,492.89 5,396.90
- Tukang kayu Oh 0.085 74,788.75 6,357.04
- Kepala tukang Oh 0.008 86,105.63 688.85
- Mandor Oh 0.004 97,412.42 389.65
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Upah Tenaga 12,832.43
Jumlah Total 514,856.07
Dibulatkan 514,850.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Upah tenaga:
- Pekerja Oh 0.040 63,492.89 2,539.72
- Tukang kayu Oh 0.400 74,788.75 29,915.50
- Kepala tukang Oh 0.025 86,105.63 2,152.64
- Mandor Oh 0.001 97,412.42 121.77
Jumlah Upah Tenaga 34,729.62
Jumlah Total 203,093.67
Dibulatkan 203,090.00
17. Pasang talang 1/2 lingkaran D-15 cm, seng BJLS 30 / tiap 1 m'
Harga bahan:
- Seng plat 3x6 ft BJLS 28 (0,28 mm) Lbr 0.500 67,880.82 33,940.41
- Paku biasa 1/2"- 1" kg 0.010 25,688.00 256.88
- Besi pelat strip kg 0.500 10,789.79 5,394.89
Jumlah Harga Bahan 39,592.18
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang kayu Oh 0.300 74,788.75 22,436.63
- Kepala tukang Oh 0.030 86,105.63 2,583.17
- Mandor Oh 0.007 97,412.42 681.89
Jumlah Upah Tenaga 35,225.61
Jumlah Total 74,817.80
Dibulatkan 74,810.00
18. Pasang baut Ø 16 tiap buah
Harga bahan:
- Baut Ø 16 bh 1.000 6,324.54 6,324.54
Jumlah Harga Bahan 6,324.54
Upah tenaga:
- Pekerja Oh 0.004 63,492.89 238.10
- Tukang kayu Oh 0.038 74,788.75 2,804.58
- Kepala tukang Oh 0.004 86,105.63 322.90
- Mandor Oh 0.000 97,412.42 18.26
Jumlah Upah Tenaga 3,383.84
Jumlah Total 9,708.38
Dibulatkan 9,700.00
19. Pasang baut Ø 12 tiap buah
Harga bahan:
- Baut dia 12 mm - 1" bh 1.000 4,871.08 4,871.08
Jumlah Harga Bahan 4,871.08
Upah tenaga:
- Pekerja Oh 0.004 63,492.89 238.10
- Tukang kayu Oh 0.038 74,788.75 2,804.58
- Kepala tukang Oh 0.004 86,105.63 322.90
- Mandor Oh 0.000 97,412.42 18.26
Jumlah Upah Tenaga 3,383.84
Jumlah Total 8,254.91
Dibulatkan 8,250.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
N PEKERJAAN KUNCI DAN KACA
1. Pasang 1 buah kunci tanam antik
Harga bahan:
- Kunci tanam antik bh 1.000 268,839.46 268,839.46
Jumlah Harga Bahan 268,839.46
Upah tenaga:
- Pekerja Oh 0.060 63,492.89 3,809.57
- Tukang kayu Oh 0.600 74,788.75 44,873.25
- Kepala tukang Oh 0.060 86,105.63 5,166.34
- Mandor Oh 0.003 97,412.42 292.24
Jumlah Upah Tenaga 54,141.40
Jumlah Total 322,980.86
Dibulatkan 322,980.00
2. Pasang 1 buah Lockcase swing AL Type FB8535-30 US32D ex Fino - setara
Harga bahan:
- Lockcase swing AL Type FN8535-30 US32D ex Fino setara bh 1.000 117,848.64 117,848.64
Jumlah Harga Bahan 117,848.64
Upah tenaga:
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang kayu Oh 0.500 74,788.75 37,394.38
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.001 97,412.42 48.71
Jumlah Upah Tenaga 38,939.07
Jumlah Total 156,787.71
Dibulatkan 156,780.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
3. Pasang 1 buah Lockcase swing kayu Type FB8535-60 US32D ex
Harga bahan:
- Lockcase swing kayu Type FN8535-60 US32D ex Fino setara bh 1.000 95,064.57 95,064.57
Jumlah Harga Bahan 95,064.57
Upah tenaga:
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang kayu Oh 0.500 74,788.75 37,394.38
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.001 97,412.42 48.71
Jumlah Upah Tenaga 38,939.07
Jumlah Total 134,003.64
Dibulatkan 134,000.00
4. Pasang 1 buah kunci KM ( Type Cylindrical BAT FB 601x300 US32D
- Kunci tanam KM Type Cylindrical BAT FN 601x300 US32D ex F bh 1.000 66,780.90 66,780.90
Jumlah Harga Bahan 66,780.90
Upah tenaga:
- Pekerja Oh 0.005 63,492.89 317.46
- Tukang kayu Oh 0.500 74,788.75 37,394.38
- Kepala tukang Oh 0.005 86,105.63 430.53
- Mandor Oh 0.000 97,412.42 24.35
Jumlah Upah Tenaga 38,166.72
Jumlah Total 104,947.62
Dibulatkan 104,940.00
5. Pasang 1 buah Kunci Double Cylinder Type DC.FN1001-60 US14 ex Fino setara
Harga bahan:
- Double Cylinder Type DC.FN1001-60 US14 ex Fino setara bh 1.000 82,494.05 82,494.05
Jumlah Harga Bahan 82,494.05
Upah tenaga:
- Pekerja Oh 0.005 63,492.89 317.46
- Tukang kayu Oh 0.500 74,788.75 37,394.38
- Kepala tukang Oh 0.005 86,105.63 430.53
- Mandor Oh 0.000 97,412.42 24.35
Jumlah Upah Tenaga 38,166.72
Jumlah Total 120,660.77
Dibulatkan 120,660.00
6. Pasang 1 buah kunci lemari
Harga bahan:
- Kunci lemari bh 1.000 53,929.89 53,929.89
Jumlah Harga Bahan 53,929.89
Upah tenaga:
- Pekerja Oh 0.025 63,492.89 1,587.32
- Tukang kayu Oh 0.250 74,788.75 18,697.19
- Kepala tukang Oh 0.025 86,105.63 2,152.64
- Mandor Oh 0.001 97,412.42 126.64
Jumlah Upah Tenaga 22,563.79
Jumlah Total 76,493.68
Dibulatkan 76,490.00
7. Pasang kunci gembok tiap 1 buah
Harga bahan:
- Kunci gembok bh 1.000 45,039.39 45,039.39
Jumlah Harga Bahan 45,039.39
Upah tenaga:
- Pekerja Oh 0.025 63,492.89 1,587.32
- Tukang kayu Oh 0.250 74,788.75 18,697.19
- Kepala tukang Oh 0.025 86,105.63 2,152.64
- Mandor Oh 0.001 97,412.42 126.64
Jumlah Upah Tenaga 22,563.79
Jumlah Total 67,603.18
Dibulatkan 67,600.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
8. Pasang 1 buah engsel Type SEL FB08 4x3x3 4BB US 32D ex Fino setara
Harga bahan:
- Engsel pintu Type SEL FN08 4x3x3 4BB US 32D ex Fino setar bh 1.000 28,807.45 28,807.45
Jumlah Harga Bahan 28,807.45
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 42,342.79
Dibulatkan 42,340.00
9. Pasang 1 buah engsel pintu kuningan/stainless
Harga bahan:
- Engsel pintu kuningan/stainless 4" bh 1.000 39,447.87 39,447.87
Jumlah Harga Bahan 39,447.87
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 52,983.22
Dibulatkan 52,980.00
10. Pasang 1 buah engsel jendela kuningan/stainless
Harga bahan:
- Engsel jendela kuningan/stainless 3" bh 1.000 26,309.32 26,309.32
Jumlah Harga Bahan 26,309.32
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 39,844.67
Dibulatkan 39,840.00
11. Pasang 1 buah engsel angin
Harga bahan:
- Engsel angin bh 1.000 21,114.55 21,114.55
Jumlah Harga Bahan 21,114.55
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.001 97,412.42 97.41
Jumlah Upah Tenaga 18,047.13
Jumlah Total 39,161.68
Dibulatkan 39,160.00
12. Pasang 1 buah Floor Hinges
Harga bahan:
- Floor hinges ps 1.000 1,453,576.55 1,453,576.55
Jumlah Harga Bahan 1,453,576.55
Upah tenaga:
- Pekerja Oh 0.050 63,492.89 3,174.64
- Tukang kayu Oh 0.500 74,788.75 37,394.38
- Kepala tukang Oh 0.050 86,105.63 4,305.28
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 45,117.83
Jumlah Total 1,498,694.38
Dibulatkan 1,498,690.00
13 Pasang 1 Psg Pull handle Type P.45.07FB (45cm) US32+US32D ex Fino setara
Harga bahan:
- Pull handle Type P.45.07FN (45cm) US32+US32D ex Fino set ps 1.000 164,202.44 164,202.44
Jumlah Harga Bahan 164,202.44
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Mandor Oh 0.001 97,412.42 97.41
Jumlah Upah Tenaga 18,047.13
Jumlah Total 182,249.57
Dibulatkan 182,240.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
14. Pasang 1 Psg Pull handle Type P.60.07FB (60cm) US32+US32D ex Fino setara
Harga bahan:
- Pull handle Type P.60.07FN (60cm) US32+US32D ex Fino set bh 1.000 377,115.65 377,115.65
Jumlah Harga Bahan 377,115.65
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 390,651.00
Dibulatkan 390,650.00
15. Pasang 1 buah kait angin
Harga bahan:
- Kait angin kuningan bh 1.000 24,476.38 24,476.38
Jumlah Harga Bahan 24,476.38
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 38,011.73
Dibulatkan 38,010.00
16. Pasang 1 bh Door closer Type 45713 FB RA ex Fino setara
Harga bahan:
- Door closer Type 45713 FN RA ex Fino setara bh 1.000 267,123.58 267,123.58
Jumlah Harga Bahan 267,123.58
Upah tenaga:
- Pekerja Oh 0.050 63,492.89 3,174.64
- Tukang kayu Oh 0.500 74,788.75 37,394.38
- Kepala tukang Oh 0.050 86,105.63 4,305.28
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 45,117.83
Jumlah Total 312,241.42
Dibulatkan 312,240.00
17. Pasang 1 buah kunci selot
Harga bahan:
- Kunci selot bh 1.000 21,786.29 21,786.29
Jumlah Harga Bahan 21,786.29
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang kayu Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.001 97,412.42 97.41
Jumlah Upah Tenaga 18,047.13
Jumlah Total 39,833.42
Dibulatkan 39,830.00
18. Pasang 1 Psg Window Casement stay Type CMT FN 27 20" US32D ex Fino setara
Harga bahan:
- Window Casement stay Type CMT FN 27 20" US32D ex Fino s psg 1.000 141,418.37 141,418.37
Jumlah Harga Bahan 141,418.37
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 154,953.72
Dibulatkan 154,950.00
19. Pasang 1 Psg Window Casement stay Type CMT FN 27 8" US32D ex Fino setara
Harga bahan:
- Window Casement stay Type CMT FN 27 8" US32D ex Fino se psg 1.000 51,067.74 51,067.74
Jumlah Harga Bahan 51,067.74
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 64,603.09
Dibulatkan 64,600.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
20. Pasang 1bh Rambuncis Type RMB - FN 090 RH B ex Fino setara
Harga bahan:
- Rambuncis Type RMB - FN 090 RH B ex Fino setara bh 1.000 47,139.46 47,139.46
Jumlah Harga Bahan 47,139.46
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 60,674.81
Dibulatkan 60,670.00
21. Pasang 1 bh Lever handle Type HRE.85.01FN US32D ex Fino setara
Harga bahan:
- Lever handle Type HRE.85.01FN US32D ex Fino setara Psg 1.000 164,988.10 164,988.10
Jumlah Harga Bahan 164,988.10
Upah tenaga:
- Pekerja Oh 0.050 63,492.89 3,174.64
- Tukang kayu Oh 0.500 74,788.75 37,394.38
- Kepala tukang Oh 0.050 86,105.63 4,305.28
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 45,117.83
Jumlah Total 210,105.93
Dibulatkan 210,100.00
22. Pasang 1 bh Door stop Type STP-FN017 US15 ex Fino setara
Harga bahan:
- Door stop Type STP-FN017 US15 ex Fino setara bh 1.000 43,211.17 43,211.17
Jumlah Harga Bahan 43,211.17
Upah tenaga:
- Pekerja Oh 0.010 63,492.89 634.93
- Tukang kayu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.001 97,412.42 48.71
Jumlah Upah Tenaga 9,023.57
Jumlah Total 52,234.73
Dibulatkan 52,230.00
23. Pasang Sliding Set Type P-FN 85 2M ex Fino setara
Harga bahan:
- Sliding Set Type P-FN 85 2M ex Fino setara bh 1.000 534,247.17 534,247.17
Jumlah Harga Bahan 534,247.17
Upah tenaga:
- Pekerja Oh 0.060 63,492.89 3,809.57
- Tukang kayu Oh 0.600 74,788.75 44,873.25
- Kepala tukang Oh 0.060 86,105.63 5,166.34
- Mandor Oh 0.003 97,412.42 292.24
Jumlah Upah Tenaga 54,141.40
Jumlah Total 588,388.57
Dibulatkan 588,380.00
24. Pasang Kaca sunergy blue green Tempered t = 8 mm / m2
Harga bahan:
- Kaca sunergy blue green Tempered t = 8 mm m² 1.100 735,375.51 808,913.06
Jumlah Harga Bahan 808,913.06
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 822,448.41
Dibulatkan 822,440.00
25. Pasang kaca tebal 6 mm tiap 1 m²
Harga bahan:
- Kaca 6 mm m² 1.100 85,322.42 93,854.66
Jumlah Harga Bahan 93,854.66
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 107,390.01
Dibulatkan 107,390.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
26. Pasang kaca es tebal 5 mm tiap 1 m²
Harga bahan:
- Kaca es 5 mm m² 1.100 87,600.82 96,360.90
Jumlah Harga Bahan 96,360.90
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 109,896.25
Dibulatkan 109,890.00
27. Pasang kaca rayben tebal 5 mm tiap 1 m²
Harga bahan:
- Kaca rayben 5 mm m² 1.100 117,691.51 129,460.66
Jumlah Harga Bahan 129,460.66
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 73.06
Jumlah Upah Tenaga 13,535.35
Jumlah Total 142,996.01
Dibulatkan 142,990.00
28. Pasang kaca tebal 8 mm tiap 1 m²
Harga bahan:
- Kaca 8 mm m² 1.100 113,698.40 125,068.24
Jumlah Harga Bahan 125,068.24
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 77.93
Jumlah Upah Tenaga 13,540.22
Jumlah Total 138,608.46
Dibulatkan 138,600.00
29 Pasang kaca tebal 10 mm tiap 1 m²
Harga bahan:
- Kaca 10 mm m² 1.100 154,744.69 170,219.16
Jumlah Harga Bahan 170,219.16
Upah tenaga:
- Pekerja Oh 0.015 63,492.89 952.39
- Tukang kayu Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.001 97,412.42 77.93
Jumlah Upah Tenaga 13,540.22
Jumlah Total 183,759.38
Dibulatkan 183,750.00
30. Pasang kaca rayben tebal 8 mm tiap 1 m²
Harga bahan:
- Kaca rayben 8 mm m² 1.100 138,707.85 152,578.63
Jumlah Harga Bahan 152,578.63
- Pekerja Oh 0.017 63,492.89 1,047.63
- Tukang kayu Oh 0.165 74,788.75 12,340.14
- Kepala tukang Oh 0.017 86,105.63 1,420.74
- Mandor Oh 0.001 97,412.42 77.93
Jumlah Upah Tenaga 14,886.45
Jumlah Total 167,465.08
Dibulatkan 167,460.00
31. Pasang kaca rayben tebal 10 mm tiap 1 m²
Harga bahan:
- Kaca rayben 10 mm m² 1.100 152,578.63 167,836.50
Jumlah Harga Bahan 167,836.50
- Pekerja Oh 0.017 63,492.89 1,047.63
- Tukang kayu Oh 0.165 74,788.75 12,340.14
- Kepala tukang Oh 0.017 86,105.63 1,420.74
- Mandor Oh 0.001 97,412.42 77.93
Jumlah Upah Tenaga 14,886.45
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Total 182,722.95
Dibulatkan 182,720.00
32. Pasang kaca rayben tebal 12 mm tiap 1 m²
Harga bahan:
- Kaca rayben 12 mm m² 1.100 177,167.75 194,884.53
Jumlah Harga Bahan 194,884.53
- Pekerja Oh 0.017 63,492.89 1,047.63
- Tukang kayu Oh 0.165 74,788.75 12,340.14
- Kepala tukang Oh 0.017 86,105.63 1,420.74
- Mandor Oh 0.001 97,412.42 121.77
Jumlah Upah Tenaga 14,930.28
Jumlah Total 209,814.81
Dibulatkan 209,810.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
33. Pasang Kaca Tempered polos 12 mm tiap 1 m2
Harga bahan:
- Kaca Tempered polos 12 mm m² 1.100 353,545.92 388,900.51
Jumlah Harga Bahan 388,900.51
- Pekerja Oh 0.025 63,492.89 1,587.32
- Tukang kayu Oh 0.250 74,788.75 18,697.19
- Kepala tukang Oh 0.025 86,105.63 2,152.64
- Mandor Oh 0.001 97,412.42 121.77
Jumlah Upah Tenaga 22,558.92
Jumlah Total 411,459.43
Dibulatkan 411,450.00
34. Pasang Kaca Tempered polos 10 mm tiap 1 m2
Harga bahan:
- Kaca Tempered polos 10 mm m² 1.100 314,263.04 345,689.34
Jumlah Harga Bahan 345,689.34
- Pekerja Oh 0.025 63,492.89 1,587.32
- Tukang kayu Oh 0.250 74,788.75 18,697.19
- Kepala tukang Oh 0.025 86,105.63 2,152.64
- Mandor Oh 0.001 97,412.42 121.77
Jumlah Upah Tenaga 22,558.92
Jumlah Total 368,248.26
Dibulatkan 368,240.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 438,203.39
Dibulatkan 438,200.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
2. Pasang Lantai keramik 40 x 40 cm ex Roman - setara ( Type G449336 D'Panarea Perla ) Gol B / m2
Harga bahan:
- Ubin keramik 40 x 40 cm Roman ( Type G449336 D'Panarea Pebh 6.630 14,161.33 93,889.64
- Semen portland kg 9.800 1,521.52 14,910.90
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.300 2,521.96 3,278.55
Jumlah Harga Bahan 128,084.69
Upah tenaga:
- Pekerja Oh 0.250 63,492.89 15,873.22
- Tukang batu Oh 0.125 74,788.75 9,348.59
- Kepala tukang Oh 0.013 86,105.63 1,119.37
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 27,607.55
Jumlah Total 155,692.24
Dibulatkan 155,690.00
3. Pasang Lantai keramik 40 x 40 cm ex Roman - setara( Type G449537 D'Panarea Bruno ) Gol C / m2
Harga bahan:
- Ubin keramik 40 x 40 cm Roman ( Type G449537 D'Panarea B bh 6.630 14,161.33 93,889.64
- Semen portland kg 9.800 1,521.52 14,910.90
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.300 2,521.96 3,278.55
Jumlah Harga Bahan 128,084.69
Upah tenaga:
- Pekerja Oh 0.250 63,492.89 15,873.22
- Tukang batu Oh 0.120 74,788.75 8,974.65
- Kepala tukang Oh 0.012 86,105.63 1,033.27
- Mandor Oh 0.013 97,412.42 1,266.36
Jumlah Upah Tenaga 27,147.50
Jumlah Total 155,232.19
Dibulatkan 155,230.00
4. Pasang Lantai Homogenius Tile 80 x 80 cm ex Monalisa - Setara ( Type WLHP 6612 CM ) / m2
Harga bahan:
- Homogenius Tile 80 x 80 cm ex Monalisa - Setara ( Type WL bh 1.250 250,656.20 313,320.25
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.500 2,521.96 3,782.94
Jumlah Harga Bahan 348,323.99
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 419,801.71
Dibulatkan 419,800.00
5. Pasang Lantai Homogenius Tile 60 x 60 cm ex Monalisa - Setara tiap 1m2 ( Type FMB )
Harga bahan:
- Homogenius Tile 60 x 60 cm ex Monalisa - Setara ( Type FMB bh 3.000 156,817.26 470,451.77
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.500 2,521.96 3,782.94
Jumlah Harga Bahan 505,455.51
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 576,933.23
Dibulatkan 576,930.00
6 Pasang lantai Homogenius Tile 60 x 60 cm ex Monalisa - setara tiap 1m² ( Type WP109 )
Harga bahan:
- Homogenius Tile 60 x 60 cm ex Monalisa - Setara ( Type WP bh 3.000 91,345.79 274,037.37
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.500 2,521.96 3,782.94
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Harga Bahan 309,041.11
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 380,518.83
Dibulatkan 380,510.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
7 Pasang lantai Homogenius Tile 60 x 60 cm ex Monalisa - setara tiap 1m² ( Type WYSP 0012 CM )
Harga bahan:
- Homogenius Tile 60 x 60 cm ex Monalisa - Setara ( Type WY bh 3.000 101,821.22 305,463.67
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.500 2,521.96 3,782.94
Jumlah Harga Bahan 340,467.42
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 411,945.14
Dibulatkan 411,940.00
8 Pasang lantai Homogenius Tile 80 x 80 cm ex Monalisa - setara tiap 1m² ( Type FMB )
Harga bahan:
- Homogenius Tile 80 x 80 cm ex Monalisa - Setara ( Type FMB bh 1.250 470,640.33 588,300.41
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.500 2,521.96 3,782.94
Jumlah Harga Bahan 623,304.15
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 694,781.87
Dibulatkan 694,780.00
9. Pasang lantai Keramik 30 x 60 cm ex Roman - setara tiap 1m² ( Type W63610 d'Metro Day ) Gol B
Harga bahan:
- Ubin keramik 30 x 60 cm Roman ( Type W63610 d'Metrro Day bh 6.000 22,260.30 133,561.79
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.500 2,521.96 3,782.94
Jumlah Harga Bahan 168,565.53
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 240,043.26
Dibulatkan 240,040.00
10. Pasang lantai Keramik 30 x 60 cm ex Roman - setara tiap 1m² ( Type W63650 d'Metro Night ) Gol C
Harga bahan:
- Ubin keramik 30 x 60 cm Roman ( Type W63650 d'Metro NIgh bh 6.000 20,296.15 121,776.93
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.500 2,521.96 3,782.94
Jumlah Harga Bahan 156,780.67
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 228,258.39
Dibulatkan 228,250.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
11. Pasang lantai keramik 30 x 30 cm ex Roman - setara tiap 1m² ( Type G337403 Granity Smoke ) Gol B
Harga bahan:
- Ubin keramik 30 x 30 cm Roman ( Type G 337403 Granity Sm bh 11.870 6,736.36 79,960.64
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.500 2,521.96 3,782.94
Jumlah Harga Bahan 114,964.38
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 186,442.10
Dibulatkan 186,440.00
12. Pasang lantai keramik 30 x 30 cm ex Roman - setara tiap 1m² ( Type G337106 Vivaz Bianco )
Harga bahan:
- Ubin keramik 30 x 30 cm Roman ( Type G 337106 Vivaz Bianc bh 11.870 6,736.36 79,960.64
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.500 2,521.96 3,782.94
Jumlah Harga Bahan 114,964.38
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 186,442.10
Dibulatkan 186,440.00
13. Pasang lantai keramik 20 x 20 cm ex Roman - setara tiap 1m² ( Type G223003 Granity Smoke )
Harga bahan:
- Ubin keramik 20 x 20 cm Roman ( Type G223003 Granity Sm bh 26.500 6,736.36 178,513.64
- Semen portland kg 10.400 1,521.52 15,823.81
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.620 2,521.96 4,085.58
Jumlah Harga Bahan 214,428.62
Upah tenaga:
- Pekerja Oh 0.700 63,492.89 44,445.02
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.035 97,412.42 3,409.43
Jumlah Upah Tenaga 77,044.22
Jumlah Total 291,472.84
Dibulatkan 291,470.00
14. Pasang lantai keramik 20 x 20 cm ex Roman - setara tiap 1m2 ( Type G227058 Venere Cream ) Gol A
Harga bahan:
- Ubin keramik 20 x 20 cm Roman ( Type G227058 Venere Cre bh 26.500 6,736.36 178,513.64
- Semen portland kg 10.400 1,521.52 15,823.81
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.620 2,521.96 4,085.58
Jumlah Harga Bahan 214,428.62
Upah tenaga:
- Pekerja Oh 0.700 63,492.89 44,445.02
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.035 97,412.42 3,409.43
Jumlah Upah Tenaga 77,044.22
Jumlah Total 291,472.84
Dibulatkan 291,470.00
15. Pasang Dinding keramik 20 x 40 cm ex Roman - setara tiap 1m2 ( Type W40564 Denim Blue ) Gol B
Harga bahan:
- Ubin keramik 20 x 40 cm Roman ( Type W40564 Denim Blue ) bh 12.720 12,719.27 161,789.07
- Semen portland kg 10.400 1,521.52 15,823.81
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.620 2,521.96 4,085.58
Jumlah Harga Bahan 197,704.06
Upah tenaga:
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pekerja Oh 0.700 63,492.89 44,445.02
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.035 97,412.42 3,409.43
Jumlah Upah Tenaga 77,044.22
Jumlah Total 274,748.27
Dibulatkan 274,740.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
16. Pasang Lantai Homogenius Tile 100 x 100 cm ex Monalisa - Setara ( Type WRMP 0001 CM ) / m2
Harga bahan:
- Homogenius Tile 100 x 100 cm ex Monalisa - Setara ( Type m² 1.060 454,738.62 482,022.94
- Semen portland kg 8.190 1,521.52 12,461.25
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 0.650 2,521.96 1,639.27
Jumlah Harga Bahan 512,129.06
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 583,606.78
Dibulatkan 583,600.00
17. Pasang lantai parquet jati tiap 1m²
Harga bahan:
- Parquet ( Dream Wood ) uk 19 x 20 cm m² 1.050 272,016.00 285,616.80
- Lem vinyl kg 0.600 35,747.42 21,448.45
Jumlah Harga Bahan 307,065.25
Upah tenaga:
- Pekerja Oh 0.650 63,492.89 41,270.38
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.033 97,412.42 3,165.90
Jumlah Upah Tenaga 73,626.04
Jumlah Total 380,691.29
Dibulatkan 380,690.00
18. Pasang Lantai keramik 60 x 60 cm ex Roman - setara ( Midnight Black Unpholis )/m2
Harga bahan:
- keramik 60 x 60 cm ex Roman - setara ( Midnight Black Unphobh 3.000 47,139.46 141,418.37
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.500 2,521.96 3,782.94
Jumlah Harga Bahan 156,633.57
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 228,111.29
Dibulatkan 228,110.00
19. Pasang Floor Hardener tiap 1m²
Harga bahan:
- Floor Hardener MU-700 kg 5.000 8,893.41 44,467.06
Jumlah Harga Bahan 44,467.06
Upah tenaga:
- Pekerja Oh 0.120 63,492.89 7,619.15
- Tukang batu Oh 0.120 74,788.75 8,974.65
- Kepala tukang Oh 0.012 86,105.63 1,033.27
- Mandor Oh 0.006 97,412.42 584.47
Jumlah Upah Tenaga 18,211.54
Jumlah Total 62,678.60
Dibulatkan 62,670.00
20. Pasang Dinding keramik 30 x 60 cm ex Roman - setara tiap 1m² ( Type W63535 dColosseum Beige ) Gol B
Harga bahan:
- Ubin keramik 30 x 60 cm Roman ( Type W63535 dColosseum bh 6.000 20,034.27 120,205.61
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.940 2,521.96 4,892.60
Jumlah Harga Bahan 156,319.02
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.450 74,788.75 33,654.94
- Kepala tukang Oh 0.045 86,105.63 3,874.75
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 79,817.65
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Total 236,136.67
Dibulatkan 236,130.00
Dibulatkan 236,130.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
21. Pasang Dinding keramik 30 x 60 cm ex Roman - setara tiap 1m² ( Type W63610 d'Metro Day ) Gol B
Harga bahan:
- Ubin keramik 30 x 60 cm Roman ( Type W63610 d'Metrro Day bh 6.000 20,296.15 121,776.93
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.940 2,521.96 4,892.60
Jumlah Harga Bahan 157,890.33
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.450 74,788.75 33,654.94
- Kepala tukang Oh 0.045 86,105.63 3,874.75
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 79,817.65
Jumlah Total 237,707.99
Dibulatkan 237,700.00
22. Pasang Dinding keramik 30 x 60 cm ex Roman - setara tiap 1m² ( Type W63650 d'Metro Night ) Gol C
Harga bahan:
- Ubin keramik 30 x 60 cm Roman ( Type W63650 d'Metro NIgh bh 6.000 22,260.30 133,561.79
- Semen portland kg 10.000 1,521.52 15,215.20
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.940 2,521.96 4,892.60
Jumlah Harga Bahan 169,675.20
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.450 74,788.75 33,654.94
- Kepala tukang Oh 0.045 86,105.63 3,874.75
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 79,817.65
Jumlah Total 249,492.85
Dibulatkan 249,490.00
23. Pasang dinding keramik 30 x 30 cm ex Roman - setara tiap 1m² ( Type G 337106 Vivaz Bianco )
Harga bahan:
- Ubin keramik 30 x 30 cm Roman ( Type G 337106 Vivaz Bianc bh 11.870 6,736.36 79,960.64
- Semen portland kg 9.300 1,521.52 14,150.14
- Pasir pasang m³ 0.018 355,680.00 6,402.24
- Semen warna kg 1.940 2,521.96 4,892.60
Jumlah Harga Bahan 105,405.62
Upah tenaga:
- Pekerja Oh 0.600 63,492.89 38,095.73
- Tukang batu Oh 0.450 74,788.75 33,654.94
- Kepala tukang Oh 0.045 86,105.63 3,874.75
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 78,547.80
Jumlah Total 183,953.41
Dibulatkan 183,950.00
24. Pasang dinding keramik 20 x 20 cm ex Roman - setara tiap 1m² ( Type G223003 Granity Smoke )
Harga bahan:
- Ubin keramik 20 x 20 cm Roman ( Type G223003 Granity Sm bh 26.500 6,736.36 178,513.64
- Semen portland kg 10.400 1,521.52 15,823.81
- Pasir pasang m³ 0.045 355,680.00 16,005.60
- Semen warna kg 1.620 2,521.96 4,085.58
Jumlah Harga Bahan 214,428.62
Upah tenaga:
- Pekerja Oh 0.600 63,492.89 38,095.73
- Tukang batu Oh 0.450 74,788.75 33,654.94
- Kepala tukang Oh 0.045 86,105.63 3,874.75
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 78,547.80
Jumlah Total 292,976.42
Dibulatkan 292,970.00
25. Pasang Dinding keramik 20 x 60 cm ex Roman - setara tiap 1m2 ( Type W62761 dHawkins Amarillo ) Gol C
Harga bahan:
- Ubin keramik 20 x 60 cm Roman ( Type W62761 dHawkins Ama bh 8.500 16,695.22 141,909.40
- Semen portland kg 9.300 1,521.52 14,150.14
- Pasir pasang m³ 0.018 355,680.00 6,402.24
- Semen warna kg 1.940 2,521.96 4,892.60
Jumlah Harga Bahan 167,354.38
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Upah tenaga:
- Pekerja Oh 0.600 63,492.89 38,095.73
- Tukang batu Oh 0.450 74,788.75 33,654.94
- Kepala tukang Oh 0.045 86,105.63 3,874.75
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 78,547.80
Jumlah Total 245,902.18
Dibulatkan 245,900.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
26. Pasang dinding batu paras tiap m2
Harga bahan:
- Batu paras m² 1.100 101,157.34 111,273.08
- Semen portland kg 11.750 1,521.52 17,877.86
- Pasir pasang m³ 0.035 355,680.00 12,448.80
Jumlah Harga Bahan 141,599.74
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.300 97,412.42 29,223.73
Jumlah Upah Tenaga 97,779.08
Jumlah Total 239,378.81
Dibulatkan 239,370.00
27. Pasang dinding batu tempel palimanan tiap 1m²
Harga bahan:
- Batu palimanan m² 1.100 67,139.64 73,853.61
- Pasir pasang m³ 0.035 355,680.00 12,448.80
- Semen portland kg 11.750 1,521.52 17,877.86
Jumlah Harga Bahan 104,180.27
Upah tenaga:
- Pekerja Oh 0.620 63,492.89 39,365.59
- Tukang batu Oh 0.350 74,788.75 26,176.06
- Kepala tukang Oh 0.035 86,105.63 3,013.70
- Mandor Oh 0.030 97,412.42 2,922.37
Jumlah Upah Tenaga 71,477.72
Jumlah Total 175,657.99
Dibulatkan 175,650.00
28. Pasang plint ubin marmer ukuran 10 x 60 cm tiap 1m'
Harga bahan:
- Plint ubin marmer 10 x 60 bh 1.700 11,784.86 20,034.27
- Semen portland kg 1.140 1,521.52 1,734.53
- Pasir pasang m³ 0.003 355,680.00 1,067.04
- Semen warna kg 0.100 2,521.96 252.20
Jumlah Harga Bahan 23,088.04
Upah tenaga:
- Pekerja Oh 0.090 63,492.89 5,714.36
- Tukang batu Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 13,707.36
Jumlah Total 36,795.40
Dibulatkan 36,790.00
29. Pasang plint ubin marmer ukuran 10 x 40 cm tiap 1m'
Harga bahan:
- Plint ubin marmer 10 x 40 bh 2.650 7,463.75 19,778.93
- Semen portland kg 1.140 1,521.52 1,734.53
- Pasir pasang m³ 0.003 355,680.00 1,067.04
- Semen warna kg 0.100 2,521.96 252.20
Jumlah Harga Bahan 22,832.70
Upah tenaga:
- Pekerja Oh 0.090 63,492.89 5,714.36
- Tukang batu Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 13,707.36
Jumlah Total 36,540.06
Dibulatkan 36,540.00
30. Pasang plint ubin marmer ukuran 10 x 30 cm tiap 1m'
Harga bahan:
- Plint ubin marmer 10 x 30 bh 3.530 5,656.73 19,968.27
- Semen portland kg 1.140 1,521.52 1,734.53
- Pasir pasang m³ 0.003 355,680.00 1,067.04
- Semen warna kg 0.100 2,521.96 252.20
Jumlah Harga Bahan 23,022.04
Upah tenaga:
- Pekerja Oh 0.090 63,492.89 5,714.36
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Tukang batu Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 13,707.36
Jumlah Total 36,729.40
Dibulatkan 36,720.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
31. Pasang plint granito tile ukuran 10 x 40 cm / tiap 1m'
Harga bahan:
- Plint granito tile 10x40 cm ( Polished ) bh 2.650 9,160.77 24,276.03
- Semen portland kg 1.140 1,521.52 1,734.53
- Pasir pasang m³ 0.003 355,680.00 1,067.04
- Semen warna kg 0.100 2,521.96 252.20
Jumlah Harga Bahan 27,329.80
Upah tenaga:
- Pekerja Oh 0.090 63,492.89 5,714.36
- Tukang batu Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 13,707.36
Jumlah Total 41,037.16
Dibulatkan 41,030.00
32. Pasang plint granito tile ukuran 10 x 60 cm / tiap 1m'
Harga bahan:
- Plint granito tile 10x60 cm ( Polished ) bh 1.670 14,173.26 23,669.35
- Semen portland kg 1.140 1,521.52 1,734.53
- Pasir pasang m³ 0.003 355,680.00 1,067.04
- Semen warna kg 0.100 2,521.96 252.20
Jumlah Harga Bahan 26,723.12
- Pekerja Oh 0.090 63,492.89 5,714.36
- Tukang batu Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 13,707.36
Jumlah Total 40,430.48
Dibulatkan 40,430.00
33. Pasang plint Granito ukuran 10 x 40 cm tiap 1m'
Harga bahan:
- Plint granito tile 10x40 cm ( Polished ) bh 2.650 9,160.77 24,276.03
- Semen portland kg 1.140 1,521.52 1,734.53
- Pasir pasang m³ 0.003 355,680.00 1,067.04
- Semen warna kg 0.100 2,521.96 252.20
Jumlah Harga Bahan 27,329.80
Upah tenaga:
- Pekerja Oh 0.090 63,492.89 5,714.36
- Tukang batu Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 13,707.36
Jumlah Total 41,037.16
Dibulatkan 41,030.00
34. Pasang plint keramik ukuran 10 x 30 cm ex Roman - setara tiap 1m'
Harga bahan:
- Plint keramik 10x30 cm bh 3.530 3,368.18 11,889.68
- Semen portland kg 1.140 1,521.52 1,734.53
- Pasir pasang m³ 0.003 355,680.00 1,067.04
- Semen warna kg 0.100 2,521.96 252.20
Jumlah Harga Bahan 14,943.45
Upah tenaga:
- Pekerja Oh 0.090 63,492.89 5,714.36
- Tukang batu Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 13,707.36
Jumlah Total 28,650.81
Dibulatkan 28,650.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
35. Pasang plint keramik ukuran 10 x 20 cm ex Roman - setara tiap 1m'
Harga bahan:
- Plint keramik 10x20 cm bh 5.300 1,618.45 8,577.81
- Semen portland kg 1.140 1,521.52 1,734.53
- Pasir pasang m³ 0.003 355,680.00 1,067.04
- Semen warna kg 0.025 2,521.96 63.05
Jumlah Harga Bahan 11,442.43
- Pekerja Oh 0.090 63,492.89 5,714.36
- Tukang batu Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.009 86,105.63 774.95
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 13,707.36
Jumlah Total 25,149.79
Dibulatkan 25,140.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Tukang batu Oh 0.100 74,788.75 7,478.88
- Kepala tukang Oh 0.010 86,105.63 861.06
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 11,758.11
Jumlah Total 100,469.43
Dibulatkan 100,460.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
33. Pasang plint vinyil 1m²
Harga bahan:
- Vinyl karet 30 x 30 cm kl 1 bh 3.500 15,701.37 54,954.79
- Lem vinyl kg 0.080 35,747.42 2,859.79
Jumlah Harga Bahan 57,814.58
Upah tenaga:
- Pekerja Oh 0.080 63,492.89 5,079.43
- Tukang batu Oh 0.080 74,788.75 5,983.10
- Kepala tukang Oh 0.008 86,105.63 688.85
- Mandor Oh 0.004 97,412.42 389.65
Jumlah Upah Tenaga 12,141.03
Jumlah Total 69,955.61
Dibulatkan 69,950.00
34. Pasang plint kayu Jati 2 x 10 cm tiap 1m'
Harga bahan:
- Kayu Jati papan m³ 0.002 42,032,681.60 84,065.36
- Paku sekrup kg 0.050 21,069.77 1,053.49
Jumlah Harga Bahan 85,118.85
Upah tenaga:
- Pekerja Oh 0.120 63,492.89 7,619.15
- Tukang kayu Oh 0.120 74,788.75 8,974.65
- Kepala tukang Oh 0.012 86,105.63 1,033.27
Mandor Oh 0.006 97,412.42 584.47
Jumlah Upah Tenaga 18,211.54
Jumlah Total 103,330.39
35 Waterproofing Type Bitutene membran self adhessive sistem t = 1,5 mm / m2 Dibulatkan 103,330.00
Harga bahan:
- Waterproofing Type Bitutene membran self adhessive siste m2 1.100 102,135.49 112,349.04
Jumlah Harga Bahan 112,349.04
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Tukang cat Oh 0.500 74,788.75 37,394.38
- Kepala tukang Oh 0.050 86,105.63 4,305.28
- Mandor Oh 0.008 97,412.42 779.30
Jumlah Upah Tenaga 52,002.89
Jumlah Total 164,351.93
Dibulatkan 164,350.00
P PEKERJAAN PENGECATAN
1. Mengikis/mengerok permukaan tembok lama tiap 1 m²
Upah tenaga:
- Pekerja Oh 0.150 63,492.89 9,523.93
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 9,767.46
Jumlah Total 9,767.46
Dibulatkan 9,760.00
2. Mendempul dan menggosok kayu 1 m²
Harga bahan:
- Dempul kayu kg 0.080 52,364.00 4,189.12
- Minyak cat/ thinner Ltr 0.020 43,472.00 869.44
- Amplas Lbr 0.100 5,928.00 592.80
Jumlah Harga Bahan 5,651.36
Upah tenaga:
- Pekerja Oh 0.040 63,492.89 2,539.72
- Tukang cat Oh 0.040 74,788.75 2,991.55
- Kepala tukang Oh 0.004 86,105.63 344.42
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 6,119.22
Jumlah Total 11,770.58
Dibulatkan 11,770.00
3. Pengecatan dengan cat KW 2 bidang kayu lama 1 m²
Harga bahan:
- Plamir kayu kg 0.150 57,304.00 8,595.60
- Cat kayu/besi KW 2 (cat dasar) kg 0.170 51,376.00 8,733.92
- Cat kayu/besi KW 2 (cat penutup) kg 0.170 51,376.00 8,733.92
- Amplas lbr 0.500 5,928.00 2,964.00
- Minyak cat/ thinner ltr 0.200 43,472.00 8,694.40
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- kuas bh 0.050 32,604.00 1,630.20
Jumlah Harga Bahan 39,352.04
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang cat Oh 0.075 74,788.75 5,609.16
- Kepala tukang Oh 0.008 86,105.63 645.79
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 10,942.98
Jumlah Total 50,295.02
Dibulatkan 50,290.00
4. Pengecatan dengan cat Mowilex bidang kayu lama 1 m²
Harga bahan:
- Plamir kayu kg 0.150 57,304.00 8,595.60
- Cat kayu/besi Mowilex (cat dasar) kg 0.170 51,376.00 8,733.92
- Cat kayu/besi Mowilex (cat penutup) kg 0.170 51,376.00 8,733.92
- Amplas lbr 0.500 5,928.00 2,964.00
- Minyak cat/ thinner ltr 0.200 43,472.00 8,694.40
- kuas bh 0.050 32,604.00 1,630.20
Jumlah Harga Bahan 39,352.04
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang cat Oh 0.075 74,788.75 5,609.16
- Kepala tukang Oh 0.008 86,105.63 645.79
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 10,942.98
Jumlah Total 50,295.02
Dibulatkan 50,290.00
5. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 2 lps penutup KW 2
Harga bahan:
- Cat meni kayu kg 0.200 36,556.00 7,311.20
- Plamir kayu kg 0.150 57,304.00 8,595.60
- Cat kayu/besi KW 2 (cat dasar) kg 0.170 51,376.00 8,733.92
- Cat kayu/besi KW 2 (cat penutup) kg 0.260 51,376.00 13,357.76
- Amplas lbr 0.500 5,928.00 2,964.00
- Minyak cat/ thinner ltr 0.200 43,472.00 8,694.40
- kuas bh 0.050 32,604.00 1,630.20
Jumlah Harga Bahan 51,287.08
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang cat Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 11,935.65
Jumlah Total 63,222.73
Dibulatkan 63,220.00
6. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 2 lps penutup Mowilex
Harga bahan:
- Cat meni kayu kg 0.200 36,556.00 7,311.20
- Plamir kayu kg 0.150 57,304.00 8,595.60
- Cat kayu/besi Mowilex (cat dasar) kg 0.170 51,376.00 8,733.92
- Cat kayu/besi Mowilex (cat penutup) kg 0.260 51,376.00 13,357.76
- Amplas lbr 0.500 5,928.00 2,964.00
- Minyak cat/ thinner ltr 0.200 43,472.00 8,694.40
- kuas bh 0.050 32,604.00 1,630.20
Jumlah Harga Bahan 51,287.08
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang cat Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 11,935.65
Jumlah Total 63,222.73
Dibulatkan 63,220.00
7. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 3 lps penutup KW 2
Harga bahan:
- Cat meni kayu kg 0.200 36,556.00 7,311.20
- Plamir kayu kg 0.150 57,304.00 8,595.60
- Cat kayu/besi KW 2 (cat dasar) kg 0.170 51,376.00 8,733.92
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Cat kayu/besi KW 2 (cat penutup) kg 0.350 51,376.00 17,981.60
- Amplas lbr 0.500 5,928.00 2,964.00
- Minyak cat/ thinner ltr 0.300 43,472.00 13,041.60
- kuas bh 0.050 32,604.00 1,630.20
Jumlah Harga Bahan 60,258.12
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang cat Oh 0.105 74,788.75 7,852.82
- Kepala tukang Oh 0.004 86,105.63 344.42
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 12,885.27
Jumlah Total 73,143.39
Dibulatkan 73,140.00
8. Pengecatan bidang kayu baru dg plamir 1 m² + 1 lps dsr + 3 lps penutup Mowilex
Harga bahan:
- Cat meni kayu kg 0.200 36,556.00 7,311.20
- Plamir kayu kg 0.150 57,304.00 8,595.60
- Cat kayu/besi Mowilex (cat dasar) kg 0.170 51,376.00 8,733.92
- Cat kayu/besi Mowilex (cat penutup) kg 0.350 51,376.00 17,981.60
- Amplas lbr 0.500 5,928.00 2,964.00
- Minyak cat/ thinner ltr 0.300 43,472.00 13,041.60
- kuas bh 0.050 32,604.00 1,630.20
Jumlah Harga Bahan 60,258.12
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang cat Oh 0.105 74,788.75 7,852.82
- Kepala tukang Oh 0.004 86,105.63 344.42
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 12,885.27
Jumlah Total 73,143.39
Dibulatkan 73,140.00
9. Pelaburan bidang kayu dgn politur 1 m²
Harga bahan:
- Politur Ltr 0.150 37,220.53 5,583.08
- Politur jadi Ltr 0.372 65,208.00 24,257.38
- Amplas Lbr 2.000 5,928.00 11,856.00
- kuas bh 0.050 32,604.00 1,630.20
Jumlah Harga Bahan 43,326.66
Upah tenaga:
- Tukang cat Oh 0.060 74,788.75 4,487.33
- Kepala tukang Oh 0.016 86,105.63 1,377.69
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 6,108.55
Jumlah Total 49,435.20
Dibulatkan 49,430.00
10. Pengecatan bidang kayu dengan politur Ultran tiap 1 m²
Harga bahan:
- Wood filler Ultran kg 0.200 28,991.55 5,798.31
- Politur Ultran kg 0.300 40,574.50 12,172.35
- Minyak cat/ thinner Ltr 0.100 43,472.00 4,347.20
- Amplas Lbr 0.500 5,928.00 2,964.00
- Kuas bh 0.050 32,604.00 1,630.20
Jumlah Harga Bahan 26,912.06
Upah tenaga:
- Pekerja Oh 0.250 63,492.89 15,873.22
- Tukang cat Oh 0.280 74,788.75 20,940.85
- Kepala tukang Oh 0.040 86,105.63 3,444.23
- Mandor Oh 0.020 97,412.42 1,948.25
Jumlah Upah Tenaga 42,206.55
Jumlah Total 69,118.61
Dibulatkan 69,110.00
11. Pengecatan bidang kayu dengan melamik Impra tiap 1 m²
Harga bahan:
- Wood filler Ultran kg 0.250 28,991.55 7,247.89
- Sanding sealer Impra kg 0.350 33,121.75 11,592.61
- Cat warna Ultran kg 0.250 36,698.85 9,174.71
- Melamic Impra kg 0.300 34,323.02 10,296.91
- Thinner (High Class) Ltr 0.500 43,472.00 21,736.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Amplas Lbr 0.600 5,928.00 3,556.80
- Sprayer m2 1.000 0.00
Jumlah Harga Bahan 63,604.92
Upah tenaga:
- Tukang cat Melamic Oh 0.600 74,788.75 44,873.25
- Kepala tukang cat Melamic Oh 0.060 86,105.63 5,166.34
Jumlah Upah Tenaga 50,039.59
Jumlah Total 113,644.51
Dibulatkan 113,640.00
12. Pengecatan kusen kayu dengan melamik Impra tiap 1 m'
Harga bahan:
- Wood filler Ultran kg 0.120 28,991.55 3,478.99
- Sanding sealer Impra kg 0.180 33,121.75 5,961.92
- Cat warna Ultran kg 0.125 36,698.85 4,587.36
- Melamic Impra kg 0.200 34,323.02 6,864.60
- Thinner (High Class) Ltr 0.250 43,472.00 10,868.00
- Amplas Lbr 0.400 5,928.00 2,371.20
- Sprayer m' 1.000 0.00
Jumlah Harga Bahan 34,132.06
Upah tenaga:
- Tukang cat Melamic Oh 0.300 74,788.75 22,436.63
- Kepala tukang cat Melamic Oh 0.030 86,105.63 2,583.17
Jumlah Upah Tenaga 25,019.79
umlah Bahan & Tenaga 59,151.86
Dibulatkan 59,150.00
13. Pelaburan bidang kayu dgn residu dan ter 1 m²
Harga bahan:
- Residu Ltr 0.350 5,106.77 1,787.37
- kuas bh 0.050 32,604.00 1,630.20
Jumlah Harga Bahan 3,417.57
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Mandor Oh 0.006 97,412.42 584.47
Jumlah Upah Tenaga 6,933.76
Jumlah Total 10,351.33
Dibulatkan 10,350.00
14. Pelaburan bidang kayu dgn vernis 1 m²
Harga bahan:
- Vernis Ltr 0.150 29,409.52 4,411.43
- Dempul kayu Kg 0.050 52,364.00 2,618.20
- Amplas Lbr 0.100 5,928.00 592.80
- Kuas Bh 0.010 32,604.00 326.04
Jumlah Harga Bahan 7,948.47
Upah tenaga:
- Pekerja Oh 0.160 63,492.89 10,158.86
- Tukang cat Oh 0.160 74,788.75 11,966.20
- Kepala tukang Oh 0.016 86,105.63 1,377.69
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 23,746.28
Jumlah Total 31,694.75
Dibulatkan 31,690.00
15. Pengecatan tembok baru dg plamir 1 m² + 1 lps dsr + 2 lps penutup KW 2
Harga bahan:
- Plamir tembok kg 0.100 27,664.00 2,766.40
- Cat tembok KW 2 (cat dasar) kg 0.100 15,087.77 1,508.78
- Cat tembok KW 2 (cat penutup) kg 0.260 15,087.77 3,922.82
- Amplas lbr 0.300 5,928.00 1,778.40
- kuas roll bh 0.015 25,141.04 377.12
Jumlah Harga Bahan 10,353.51
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang cat Oh 0.063 74,788.75 4,711.69
- Kepala tukang Oh 0.006 86,105.63 542.47
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 6,767.55
Jumlah Total 17,121.06
Dibulatkan 17,120.00
16. Pengecatan tembok baru dg plamir 1 m² + 1 lps dsr + 2 lps Catylac
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Harga bahan:
- Plamir tembok kg 0.100 27,664.00 2,766.40
- Cat tembok Catylac (cat dasar) kg 0.100 13,470.89 1,347.09
- Cat tembok Catylac (cat penutup) kg 0.260 13,511.74 3,513.05
- Amplas lbr 0.300 5,928.00 1,778.40
- kuas roll bh 0.015 25,141.04 377.12
Jumlah Harga Bahan 9,782.06
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang cat Oh 0.063 74,788.75 4,711.69
- Kepala tukang Oh 0.006 86,105.63 542.47
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 6,767.55
Jumlah Total 16,549.60
Dibulatkan 16,540.00
17. Pengecatan tembok baru dg wall sealer 1 m² + 1 lps dsr + 2 lps Dulux/ICI
Harga bahan:
- Wall sealer Dulux/ICI kg 0.100 37,923.69 3,792.37
- Cat tembok Dulux/ICI (cat dasar) kg 0.100 59,509.52 5,950.95
- Cat tembok Dulux/ICI (cat penutup) kg 0.260 59,509.52 15,472.48
- Amplas lbr 0.300 5,928.00 1,778.40
- kuas roll bh 0.015 25,141.04 377.12
Jumlah Harga Bahan 27,371.31
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang cat Oh 0.063 74,788.75 4,711.69
- Kepala tukang Oh 0.006 86,105.63 542.47
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 6,767.55
Jumlah Total 34,138.86
Dibulatkan 34,130.00
18. Pengecatan tembok baru dg wall sealer 1 m² + 1 lps dsr + 2 lps Dulux/ICI Weathershield
Harga bahan:
- Wall sealer Dulux/ICI kg 0.100 37,923.69 3,792.37
- Cat tembok Dulux/ICI Weathershield kg 0.360 71,416.28 25,709.86
- Amplas lbr 0.300 5,928.00 1,778.40
- kuas roll bh 0.015 25,141.04 377.12
Jumlah Harga Bahan 31,657.74
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang cat Oh 0.063 74,788.75 4,711.69
- Kepala tukang Oh 0.006 86,105.63 542.47
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 6,767.55
Jumlah Total 38,425.29
Dibulatkan 38,420.00
19. Pengecatan bidang tembok lama 1 m² dg 1 lps dsr + 2 lps penutup KW 2
Harga bahan:
- Cat tembok KW 2 (cat dasar) kg 0.120 15,087.77 1,810.53
- Cat tembok KW 2 (cat penutup) kg 0.180 15,087.77 2,715.80
- Amplas lbr 0.300 5,928.00 1,778.40
- kuas roll bh 0.015 25,141.04 377.12
Jumlah Harga Bahan 6,681.85
Upah tenaga:
- Pekerja Oh 0.028 63,492.89 1,777.80
- Tukang cat Oh 0.042 74,788.75 3,141.13
- Kepala tukang Oh 0.004 86,105.63 361.64
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 5,524.10
Jumlah Total 12,205.95
Dibulatkan 12,200.00
20. Pengecatan bidang tembok lama 1 m² dg 1 lps dsr + 2 lps penutup Catylac
Harga bahan:
- Cat tembok Catylac (cat dasar) kg 0.120 13,470.89 1,616.51
- Cat tembok Catylac (cat penutup) kg 0.180 13,511.74 2,432.11
- Amplas lbr 0.300 5,928.00 1,778.40
- kuas roll bh 0.015 25,141.04 377.12
Jumlah Harga Bahan 6,204.13
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Upah tenaga:
- Pekerja Oh 0.028 63,492.89 1,777.80
- Tukang cat Oh 0.042 74,788.75 3,141.13
- Kepala tukang Oh 0.004 86,105.63 361.64
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 5,524.10
Jumlah Total 11,728.24
Dibulatkan 11,720.00
21. Pengecatan bidang tembok lama 1 m² dg 1 lps dsr + 2 lps penutup Dulux/ICI
Harga bahan:
- Cat tembok Dulux/ICI (cat dasar) kg 0.120 59,509.52 7,141.14
- Cat tembok Dulux/ICI (cat penutup) kg 0.180 59,509.52 10,711.71
- Amplas lbr 0.300 5,928.00 1,778.40
- kuas roll bh 0.015 25,141.04 377.12
Jumlah Harga Bahan 20,008.37
Upah tenaga:
- Pekerja Oh 0.028 63,492.89 1,777.80
- Tukang cat Oh 0.042 74,788.75 3,141.13
- Kepala tukang Oh 0.004 86,105.63 361.64
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 5,524.10
Jumlah Total 25,532.48
Dibulatkan 25,530.00
22. Memasang wallpaper
Harga bahan:
- Wallpaper kg 0.120 90,974.44 10,916.93
- Lem perekat kg 0.180 29,061.47 5,231.07
Jumlah Harga Bahan 16,148.00
Upah tenaga:
- Pekerja Oh 0.028 63,492.89 1,777.80
- Tukang cat Oh 0.042 74,788.75 3,141.13
- Kepala tukang Oh 0.004 86,105.63 361.64
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 5,524.10
Jumlah Total 21,672.10
Dibulatkan 21,670.00
23. Mengecat genteng 1 m²
Harga bahan:
- Cat genteng KW 2 kg 0.360 23,934.27 8,616.34
Jumlah Harga Bahan 8,616.34
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang cat Oh 0.063 74,788.75 4,711.69
- Kepala tukang Oh 0.006 86,105.63 542.47
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 6,767.55
Jumlah Total 15,383.88
Dibulatkan 15,380.00
24. Pengecatan permukaan baja 1 m² dgn meni besi
Harga bahan:
- Cat meni besi kg 0.100 10,214.96 1,021.50
- Kuas bh 0.010 32,604.00 326.04
- Amplas lbr 0.400 5,928.00 2,371.20
Jumlah Harga Bahan 3,718.74
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang cat Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.001 97,412.42 97.41
Jumlah Upah Tenaga 18,047.13
Jumlah Total 21,765.87
Dibulatkan 21,760.00
25. Pengecatan permukaan baja 1 m² dgn meni besi & perancah
Harga bahan:
- Cat meni besi kg 0.100 10,214.96 1,021.50
- Kuas bh 0.010 32,604.00 326.04
- Kayu Terentang balok m³ 0.002 2,479,928.21 4,959.86
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Amplas lbr 0.400 5,928.00 2,371.20
Jumlah Harga Bahan 8,678.59
Upah tenaga:
- Pekerja Oh 0.250 63,492.89 15,873.22
- Tukang cat Oh 0.225 74,788.75 16,827.47
- Kepala tukang Oh 0.023 86,105.63 1,937.38
- Mandor Oh 0.008 97,412.42 730.59
Jumlah Upah Tenaga 35,368.66
Jumlah Total 44,047.25
Dibulatkan 44,040.00
26. Pengecatan permukaan baja tiap 1 m² dengan zinchromate
Harga bahan:
- Cat zinchromate kg 0.300 42,631.35 12,789.41
- Minyak cat/ thinner ltr 0.100 43,472.00 4,347.20
- Amplas lbr 0.400 5,928.00 2,371.20
- kuas bh 0.030 32,604.00 978.12
Jumlah Harga Bahan 20,485.93
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang cat Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 11,935.65
Jumlah Total 32,421.58
Dibulatkan 32,420.00
27. Pengecatan permukaan baja tiap 1 m² dengan Cat KW 2
Harga bahan:
- Cat meni besi kg 0.100 10,214.96 1,021.50
- Cat kayu/besi KW 2 (cat dasar) kg 0.170 51,376.00 8,733.92
- Cat kayu/besi KW 2 (cat penutup) kg 0.260 51,376.00 13,357.76
- Minyak cat/ thinner ltr 0.150 43,472.00 6,520.80
- Amplas lbr 0.400 5,928.00 2,371.20
- kuas bh 0.050 32,604.00 1,630.20
Jumlah Harga Bahan 33,635.38
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang cat Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 11,935.65
Jumlah Total 45,571.03
Dibulatkan 45,570.00
28. Pengecatan permukaan baja tiap 1 m² dengan Cat Mowilex
Harga bahan:
- Cat meni besi kg 0.100 10,214.96 1,021.50
- Cat kayu/besi Mowilex (cat dasar) kg 0.170 51,376.00 8,733.92
- Cat kayu/besi Mowilex (cat penutup) kg 0.260 51,376.00 13,357.76
- Minyak cat/ thinner ltr 0.150 43,472.00 6,520.80
- Amplas lbr 0.400 5,928.00 2,371.20
- kuas bh 0.050 32,604.00 1,630.20
Jumlah Harga Bahan 33,635.38
Upah tenaga:
- Pekerja Oh 0.070 63,492.89 4,444.50
- Tukang cat Oh 0.090 74,788.75 6,730.99
- Kepala tukang Oh 0.006 86,105.63 516.63
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 11,935.65
Jumlah Total 45,571.03
Dibulatkan 45,570.00
29. Pekerjaan cat duko 3x tiap 1 m²
Harga bahan:
- Cat Duco Nippe 2000 kg 0.750 43,663.71 32,747.78
Plamur duco kg 1.000 34,319.10 34,319.10
Meni duco kg 0.500 41,836.27 20,918.13
- Thinner (High Class) ltr 0.500 43,472.00 21,736.00
- Amplas lbr 1.000 5,928.00 5,928.00
Alat bantu % 2.000 115,649.01 2,312.98
Sewa kompresor jam 1.000 4,321.12 4,321.12
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Harga Bahan 122,283.11
Upah tenaga:
- Pekerja Oh 0.350 63,492.89 22,222.51
- Tukang cat Oh 0.400 74,788.75 29,915.50
- Kepala tukang Oh 0.100 86,105.63 8,610.56
- Mandor Oh 0.035 97,412.42 3,409.43
Jumlah Upah Tenaga 64,158.01
Jumlah Total 186,441.11
Dibulatkan 186,440.00
30. Pengecatan waterproofing (coating) tiap 1 m²
Harga bahan:
- Cumoir Waterproofing Coating kg 0.750 38,061.97 28,546.48
- kuas bh 0.200 32,604.00 6,520.80
Jumlah Harga Bahan 35,067.28
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang cat Oh 0.063 74,788.75 4,711.69
- Kepala tukang Oh 0.006 86,105.63 542.47
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 6,767.55
Jumlah Total 41,834.82
Dibulatkan 41,830.00
31. Pengecatan permukaan kayu 1 m² dgn meni
Harga bahan:
- Cat meni kayu kg 0.250 36,556.00 9,139.00
- Kuas bh 0.025 32,604.00 815.10
- Amplas lbr 0.400 5,928.00 2,371.20
Jumlah Harga Bahan 12,325.30
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Tukang cat Oh 0.200 74,788.75 14,957.75
- Kepala tukang Oh 0.020 86,105.63 1,722.11
- Mandor Oh 0.001 97,412.42 97.41
Jumlah Upah Tenaga 18,047.13
Jumlah Total 30,372.43
Dibulatkan 30,370.00
32 Grouting
Harga bahan:
- Grout kg 15.000 7,175.41 107,631.16
- alat bantu % 10.000 107,631.16 10,763.12
Jumlah Harga Bahan 118,394.28
Upah tenaga:
- Pekerja Oh 0.200 63,492.89 12,698.58
- Tukang cat Oh 0.150 74,788.75 11,218.31
- Kepala tukang Oh 0.015 86,105.63 1,291.58
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 26,182.60
Jumlah Total 144,576.88
Dibulatkan 144,570.00
Pasang Floor Hardener tiap 1m²
Harga bahan:
- Floor Hardener PM-700 kg 5.000 2,580.00 12,900.00
Jumlah Harga Bahan 12,900.00
Upah tenaga:
- Pekerja Oh 0.120 36,250.00 4,350.00
- Tukang batu Oh 0.120 45,500.00 5,460.00
- Kepala tukang Oh 0.012 52,000.00 624.00
- Mandor Oh 0.006 55,500.00 333.00
Jumlah Upah Tenaga 10,767.00
Jumlah Total 23,667.00
Dibulatkan 23,660.00
33 Cat anti lumut (silicosal) tiap m2
Harga bahan:
- silicosal ltr 0.40000 32,000.00 12,800.00
- kalbon ltr 0.05000 25,000.00 1,250.00
- kuas bh 0.25000 32,604.00 8,151.00
Semen portland kg 0.50000 1,521.52 760.76
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Upah tenaga:
- tukang cat org/hr 0.20000 74,788.75 14,957.75
- kepala tukang org/hr 0.02000 86,105.63 1,722.11
- pekerja org/hr 0.20000 63,492.89 12,698.58
- mandor org/hr 0.01000 97,412.42 974.12 53,314.32
Dibulatkan 53,310.00
34 Cat list plafond tiap m'
Harga bahan:
- Amplas lbr 0.1250 5,928.00 741.00
- Cat tembok Dulux/ICI (cat penutup) kg 0.0700 59,509.52 4,165.67
- kuas bh 0.0080 32,604.00 260.83
Upah tenaga:
- tukang cat org/hr 0.0750 74,788.75 5,609.16
- kepala tukang org/hr 0.0075 86,105.63 645.79
- pekerja org/hr 0.0600 63,492.89 3,809.57
- mandor org/hr 0.0038 97,412.42 370.17
- steager ls 1.0000 1,500.00 1,500.00 17,102.19
Dibulatkan 17,100.00
35 Cat besi Glotex tiap m2
(termasuk meni besi)
Harga bahan:
Cat kayu/besi Glotex kg 0.43 32,864.06 13,967.22
Amplas lbr 0.200 5,928.00 1,185.60
Cat meni besi kg 0.125 10,214.96 1,276.87
Thinner (High Class) ltr 0.750 43,472.00 32,604.00
kuas bh 0.100 32,604.00 3,260.40
Upah tenaga:
tukang cat org/hr 0.34 74,788.75 25,428.18
pekerja org/hr 0.200 63,492.89 12,698.58 38,126.75
90,420.85
Dibulatkan 90,420.00
Q PEKERJAAN BONGKARAN
1. Bongkar beton bertulang tiap 1m³
Upah tenaga:
- Pekerja Oh 6.667 63,492.89 423,307.08
- Mandor Oh 0.333 97,412.42 32,438.34
Jumlah Upah Tenaga 455,745.42
Jumlah Total 455,745.42
Dibulatkan 455,740.00
2. Bongkar dinding tembok bata merah tiap 1m³
Upah tenaga:
- Pekerja Oh 0.667 63,492.89 42,349.76
- Mandor Oh 0.033 97,412.42 3,214.61
Jumlah Upah Tenaga 45,564.37
Jumlah Total 45,564.37
Dibulatkan 45,560.00
3. Bongkar dinding ½ bata tiap 1m²
Upah tenaga:
- Pekerja Oh 0.073 63,492.89 4,634.98
- Mandor Oh 0.004 97,412.42 350.68
Jumlah Upah Tenaga 4,985.67
Jumlah Total 4,985.67
Dibulatkan 4,980.00
4. Bongkar pelat beton bertulang tiap 1m²
Upah tenaga:
- Pekerja Oh 0.800 63,492.89 50,794.31
- Mandor Oh 0.040 97,412.42 3,896.50
Jumlah Upah Tenaga 54,690.81
Jumlah Total 54,690.81
Dibulatkan 54,690.00
5. Bongkar batu kali tebal < 50 cm tiap 1 m³
Upah tenaga:
- Pekerja Oh 1.500 63,492.89 95,239.33
- Mandor Oh 0.075 97,412.42 7,305.93
Jumlah Upah Tenaga 102,545.26
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Jumlah Total 102,545.26
Dibulatkan 102,540.00
6. Bongkar batu kali tebal > 50 cm tiap 1 m³
Upah tenaga:
- Pekerja Oh 3.000 63,492.89 190,478.66
- Mandor Oh 0.150 97,412.42 14,611.86
Jumlah Upah Tenaga 205,090.53
Jumlah Total 205,090.53
Dibulatkan 205,090.00
7. Bongkar lantai tiap 1 m²
Upah tenaga:
- Pekerja Oh 0.050 63,492.89 3,174.64
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 3,661.71
Jumlah Total 3,661.71
Dibulatkan 3,660.00
8. Bongkar paving block tiap 1 m²
Upah tenaga:
- Pekerja Oh 0.050 63,492.89 3,174.64
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 3,661.71
Jumlah Total 3,661.71
Dibulatkan 3,660.00
9. Bongkar plesteran tiap 1 m²
Upah tenaga:
- Pekerja Oh 0.050 63,492.89 3,174.64
- Mandor Oh 0.003 97,412.42 243.53
Jumlah Upah Tenaga 3,418.18
Jumlah Total 3,418.18
Dibulatkan 3,410.00
10. Bongkar atap genteng tiap 1 m²
Upah tenaga:
- Pekerja Oh 0.020 63,492.89 1,269.86
- Mandor Oh 0.010 97,412.42 974.12
Jumlah Upah Tenaga 2,243.98
Jumlah Total 2,243.98
Dibulatkan 2,240.00
11. Bongkar karpusan atap genteng tiap 1 m'
Upah tenaga:
- Pekerja Oh 0.030 63,492.89 1,904.79
- Mandor Oh 0.015 97,412.42 1,461.19
Jumlah Upah Tenaga 3,365.97
Jumlah Total 3,365.97
Dibulatkan 3,360.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
15. Bongkar balok kuda-kuda & loteng (kayu akan dipakai lagi) tiap 1 m³
Upah tenaga:
- Pekerja Oh 2.666 63,492.89 169,272.04
- Tukang kayu Oh 4.000 74,788.75 299,155.00
- Kepala tukang Oh 0.400 86,105.63 34,442.25
- Mandor Oh 0.133 97,412.42 12,955.85
Jumlah Upah Tenaga 515,825.14
Jumlah Total 515,825.14
Dibulatkan 515,820.00
16. Bongkar balok kuda-kuda & loteng (kayu tidak akan dipakai lagi) tiap 1 m³
Upah tenaga:
- Tukang kayu Oh 4.000 74,788.75 299,155.00
- Kepala tukang Oh 0.400 86,105.63 34,442.25
Jumlah Upah Tenaga 333,597.25
Jumlah Total 333,597.25
Dibulatkan 333,590.00
17. Bongkar rangka plafon tiap 1 m²
Upah tenaga:
- Pekerja Oh 0.100 63,492.89 6,349.29
- Mandor Oh 0.005 97,412.42 487.06
Jumlah Upah Tenaga 6,836.35
Jumlah Total 6,836.35
Dibulatkan 6,830.00
18. Bongkar penutup plafon tiap 1 m²
Upah tenaga:
- Tukang kayu Oh 0.030 74,788.75 2,243.66
- Kepala tukang Oh 0.003 86,105.63 258.32
Jumlah Upah Tenaga 2,501.98
Jumlah Total 2,501.98
Dibulatkan 2,500.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Instalator Oh 0.300 86,105.63 25,831.69
- Pekerja Oh 0.150 63,492.89 9,523.93
- Mandor Oh 0.015 97,412.42 1,461.19
Err:508 Jumlah Upah Tenaga 36,816.81
Err:508 Jumlah Total 283,777.16
Err:508 Dibulatkan 283,770.00
3. Pasang instalasi lampu dg NYM 2x1,5 mm² tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
Catatan: Fitting lampu, sakelar & lampu tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Analisis dibuat untuk rumah & gedung sederhana, kabel yang dipakai NYM 2x1,5 mm².
Harga bahan:
- Kabel NYM 2x1,5 mm² m' 10.000 7,856.58 78,565.76
- Conduit pipa PVC dia ⅝" C m' 10.000 7,588.70 75,887.02
- Tee dos bh 1.000 30,046.42 30,046.42
- Inbow doos bh 1.000 2,926.57 2,926.57
- Sock bh 3.000 1,689.16 5,067.49
- Klem conduit bh 9.000 3,221.20 28,990.77
- Lastdop bh 3.000 294.23 882.69
- Flexible pipe m' 1.000 2,396.26 2,396.26
- Elbow bh 2.000 2,304.33 4,608.67
- Paku, sekrup, fisher (10% harga conduit) % 10.000 75,887.02 7,588.70
Jumlah Harga Bahan 236,960.35
Upah tenaga:
- Instalator Oh 0.300 86,105.63 25,831.69
- Pekerja Oh 0.150 63,492.89 9,523.93
- Mandor Oh 0.015 97,412.42 1,461.19
Err:508 Jumlah Upah Tenaga 36,816.81
Err:508 Jumlah Total 273,777.16
Err:508 Dibulatkan 273,770.00
4. Pasang instalasi lampu untuk gedung pertemuan & gudang tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
Catatan: Fitting lampu, sakelar & lampu tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Asumsi tinggi plafon 4-10 m', analisis tersebut dipakai untuk ruangan seperti gudang, gedung pertemuan, aula, rumah ibadat, bengkel.
Harga bahan:
- Kabel NYM 3x2,5 mm² m' 10.000 10,213.55 102,135.49
- Conduit pipa PVC dia ⅝" C m' 10.000 7,588.70 75,887.02
- Tee dos bh 1.000 30,046.42 30,046.42
- Inbow doos bh 1.000 2,926.57 2,926.57
- Sock bh 6.000 1,689.16 10,134.98
- Klem conduit bh 18.000 3,221.20 57,981.53
- Lastdop bh 3.000 294.23 882.69
- Flexible pipe m' 1.000 2,396.26 2,396.26
- Elbow bh 2.000 2,304.33 4,608.67
- Paku, sekrup, fisher (10% harga conduit) % 10.000 75,887.02 7,588.70
Jumlah Harga Bahan 294,588.33
Upah tenaga:
- Instalator Oh 0.600 86,105.63 51,663.38
- Pekerja Oh 0.300 63,492.89 19,047.87
- Mandor Oh 0.030 97,412.42 2,922.37
Err:508 Jumlah Upah Tenaga 73,633.62
Err:508 Jumlah Total 368,221.95
Err:508 Dibulatkan 368,220.00
5. Pasang instalasi lampu dg NYM 3x4 mm² tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
Catatan: Fitting lampu, sakelar & lampu tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Asumsi tinggi plafon 4-10 m', analisis tersebut dipakai untuk ruangan seperti gudang, gedung pertemuan, aula, rumah ibadat, bengkel.
Harga bahan:
- Kabel NYM 3x4 mm² m' 10.000 15,713.15 157,131.52
- Conduit pipa PVC dia ⅝" C m' 10.000 7,588.70 75,887.02
- Tee dos bh 1.000 30,046.42 30,046.42
- Inbow doos bh 1.000 2,926.57 2,926.57
- Sock bh 6.000 1,689.16 10,134.98
- Klem conduit bh 18.000 3,221.20 57,981.53
- Lastdop bh 3.000 294.23 882.69
- Flexible pipe m' 1.000 2,396.26 2,396.26
- Elbow bh 2.000 2,304.33 4,608.67
- Paku, sekrup, fisher (10% harga conduit) % 10.000 75,887.02 7,588.70
Jumlah Harga Bahan 349,584.37
Upah tenaga:
- Instalator Oh 0.600 86,105.63 51,663.38
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Pekerja Oh 0.300 63,492.89 19,047.87
- Mandor Oh 0.030 97,412.42 2,922.37
Err:508 Jumlah Upah Tenaga 73,633.62
Err:508 Jumlah Total 423,217.98
Err:508 Dibulatkan 423,210.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
- Lastdop bh 3.000 294.23 882.69
- Elbow bh 2.000 2,304.33 4,608.67
- Paku, sekrup, fisher (10% harga conduit) % 10.000 75,887.02 7,588.70
Jumlah Harga Bahan 258,133.82
Upah tenaga:
- Instalator Oh 0.300 86,105.63 25,831.69
- Pekerja Oh 0.150 63,492.89 9,523.93
- Mandor Oh 0.015 97,412.42 1,461.19
Err:508 Jumlah Upah Tenaga 36,816.81
Err:508 Jumlah Total 294,950.63
Err:508 Dibulatkan 294,950.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
12. Pasang instalasi stop kontak lebih dari 500 watt tiap 1 titik kabel NYM 3x4 mm2 (tidak termasuk stop kontak)
Catatan: Stop kontak tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Harga bahan:
- Kabel NYM 3x4 mm² m' 12.000 15,713.15 188,557.82
- Conduit pipa PVC dia ⅝" C m' 12.000 7,588.70 91,064.42
- Outlet Box Metal bh 1.000 10,000.00 10,000.00
- Tee dos bh 1.000 30,046.42 30,046.42
- Inbow doos bh 1.000 2,926.57 2,926.57
- Sock bh 9.000 1,689.16 15,202.47
- Klem conduit bh 20.000 3,221.20 64,423.92
- Lastdop bh 3.000 294.23 882.69
- Elbow bh 4.000 2,304.33 9,217.33
- Paku, sekrup, fisher (10% harga conduit) % 10.000 91,064.42 9,106.44
Jumlah Harga Bahan 421,428.11
Upah tenaga:
- Instalator Oh 0.500 86,105.63 43,052.81
- Pekerja Oh 0.250 63,492.89 15,873.22
- Mandor Oh 0.025 97,412.42 2,435.31
Err:508 Jumlah Upah Tenaga 61,361.35
Err:508 Jumlah Total 482,789.46
Err:508 Dibulatkan 482,780.00
13. Pasang instalasi listrik + outlet AC tiap 1 titik kabel NYM 3x 2,5 mm2 (tidak termasuk AC)
Catatan: Unit AC tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Harga bahan:
- Kabel NYM 3x2,5 mm² m' 10.000 10,213.55 102,135.49
- Conduit pipa PVC dia ⅝" C m' 10.000 7,588.70 75,887.02
- Kotak kontak khusus (KKK) bh 1.000 65,955.96 65,955.96
- Tee dos bh 1.000 30,046.42 30,046.42
- Inbow doos bh 1.000 2,926.57 2,926.57
- Sock bh 3.000 1,689.16 5,067.49
- Klem conduit bh 9.000 3,221.20 28,990.77
- Lastdop bh 3.000 294.23 882.69
- Elbow bh 2.000 2,304.33 4,608.67
- Paku, sekrup, fisher (10% harga conduit) % 10.000 75,887.02 7,588.70
Jumlah Harga Bahan 324,089.78
Upah tenaga:
- Instalator Oh 0.300 86,105.63 25,831.69
- Pekerja Oh 0.150 63,492.89 9,523.93
- Mandor Oh 0.015 97,412.42 1,461.19
Err:508 Jumlah Upah Tenaga 36,816.81
Err:508 Jumlah Total 360,906.58
Err:508 Dibulatkan 360,900.00
Catatan :
Analisis Pasang Instalasi Lampu dgn NYM 3x2,5 mm2 dan Pasang Instalasi Stop Kontak diatas 500 W , tertulis di
V Pekerjaan Analisa Tambahan Halaman 80.
14. Pasang instalasi + tiang antena TV tiap 1 titik (tidak termasuk socket & antena)
Catatan: Socket & antena tidak dimasukkan dalam analisis, tergantung spesifikasi teknis dan merek yang diinginkan.
Harga bahan:
- Kabel antena TV m' 20.000 3,500.00 70,000.00
- Conduit pipa PVC dia ⅝" C m' 20.000 7,588.70 151,774.04
- Inbow doos bh 1.000 2,926.57 2,926.57
- Sock bh 5.000 1,689.16 8,445.82
- Klem conduit bh 14.000 3,221.20 45,096.75
- Klem pipa besi 3/4" bh 2.000 1,728.45 3,456.89
- Pipa galvanis dia 3/4" m' 2.000 30,792.67 61,585.33
- Paku, sekrup, fisher (10% harga conduit) % 10.000 151,774.04 15,177.40
Jumlah Harga Bahan 358,462.81
Upah tenaga:
- Instalator Oh 0.300 86,105.63 25,831.69
- Pekerja Oh 0.150 63,492.89 9,523.93
- Mandor Oh 0.015 97,412.42 1,461.19
Err:508 Jumlah Upah Tenaga 36,816.81
Err:508 Jumlah Total 395,279.62
Err:508 Dibulatkan 395,270.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Upah tenaga:
- Instalator Oh 0.800 86,105.63 68,884.50
- Pekerja Oh 0.400 63,492.89 25,397.16
- Mandor Oh 0.040 97,412.42 3,896.50
Err:508 Jumlah Upah Tenaga 98,178.16
Err:508 Jumlah Total 1,292,521.19
Err:508 Dibulatkan 1,292,520.00
19. Pasang Panel Pembagi Daya 2200 VA / 10 A (3 grup @ 10 A) tiap 1 unit
Catatan: Belum termasuk penyambungan daya listrik PLN
Harga bahan:
- Kabel NYM 3x4 mm² m' 10.000 15,713.15 157,131.52
- Kabel NYM 3x2,5 mm² m' 30.000 10,213.55 306,406.46
- Conduit pipa PVC dia ⅝" C m' 40.000 7,588.70 303,548.08
- MCB box isi 4 bh 1.000 29,894.27 29,894.27
- MCB 10 A bh 4.000 33,704.71 134,818.84
- Tee dos bh 4.000 30,046.42 120,185.70
- Sock bh 10.000 1,689.16 16,891.64
- Klem conduit bh 27.000 3,221.20 86,972.30
- Lastdop bh 12.000 294.23 3,530.75
- Elbow bh 2.000 2,304.33 4,608.67
- Paku, sekrup, fisher (10% harga conduit) % 10.000 303,548.08 30,354.81
Jumlah Harga Bahan 1,194,343.04
Upah tenaga:
- Instalator Oh 0.800 86,105.63 68,884.50
- Pekerja Oh 0.400 63,492.89 25,397.16
- Mandor Oh 0.040 97,412.42 3,896.50
Err:508 Jumlah Upah Tenaga 98,178.16
Err:508 Jumlah Total 1,292,521.19
Err:508 Dibulatkan 1,292,520.00
20. Pasang pentanahan (grounding) tiap 1 titik
Harga bahan:
- Kabel BC 10 mm m' 5.000 13,896.71 69,483.56
- Conduit pipa PVC dia ⅝" C m' 3.000 7,588.70 22,766.11
- Klem conduit bh 3.000 3,221.20 9,663.59
- Lastdop bh 1.000 294.23 294.23
- Paku, sekrup, fisher (10% harga conduit) % 10.000 22,766.11 2,276.61
Jumlah Harga Bahan 104,484.09
Upah tenaga:
- Instalator Oh 0.200 86,105.63 17,221.13
- Pekerja Oh 0.100 63,492.89 6,349.29
- Mandor Oh 0.010 97,412.42 974.12
Err:508 Jumlah Upah Tenaga 24,544.54
Err:508 Jumlah Total 129,028.63
Err:508 Dibulatkan 129,020.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Err:508 Jumlah Upah Tenaga 11,785.21
Err:508 Jumlah Total 50,151.62
Err:508 Dibulatkan 50,150.00
23. Pasang 1 buah lampu down light PLC 18 watt
Harga bahan:
- Lampu down light PLC 18 watt bh 1.000 201,311.40 201,311.40
- Accecories ( 1 % alat ) % 1.000 201,311.40 2,013.11
Jumlah Harga Bahan 203,324.52
Upah tenaga:
- Instalator Oh 0.100 86,105.63 8,610.56
- Pekerja Oh 0.050 63,492.89 3,174.64
Err:508 Jumlah Upah Tenaga 11,785.21
Err:508 Jumlah Total 215,109.73
Err:508 Dibulatkan 215,100.00
24. Pasang 1 buah lampu roset 18 watt
Harga bahan:
- Lampu roset 18 watt bh 1.000 112,427.60 112,427.60
- Accecories ( 1 % alat ) % 1.000 112,427.60 1,124.28
Jumlah Harga Bahan 113,551.88
Upah tenaga:
- Instalator Oh 0.100 86,105.63 8,610.56
- Pekerja Oh 0.050 63,492.89 3,174.64
Err:508 Jumlah Upah Tenaga 11,785.21
Err:508 Jumlah Total 125,337.09
Err:508 Dibulatkan 125,330.00
25 Pasang 1 buah lampu KDK 400 watt
Harga bahan:
- Lampu KDK 400 watt bh 1.000 375,701.46 375,701.46
- Accecories ( 1 % alat ) % 1.000 375,701.46 3,757.01
Jumlah Harga Bahan 379,458.48
Upah tenaga:
- Instalator Oh 0.100 86,105.63 8,610.56
- Pekerja Oh 0.050 63,492.89 3,174.64
Err:508 Jumlah Upah Tenaga 11,785.21
Err:508 Jumlah Total 391,243.69
Err:508 Dibulatkan 391,240.00
26 Pasang 1 buah lampuTKI 2x36 W mirror reflektor
Harga bahan:
- Lampu TL TKI 2x36W Miror Reflector bh 1.000 454,515.49 454,515.49
- Accecories ( 1 % alat ) % 1.000 454,515.49 4,545.15
Jumlah Harga Bahan 459,060.65
Upah tenaga:
- Instalator Oh 0.100 86,105.63 8,610.56
- Pekerja Oh 0.050 63,492.89 3,174.64
Err:508 Jumlah Upah Tenaga 11,785.21
Err:508 Jumlah Total 470,845.85
Err:508 Dibulatkan 470,840.00
27 Pasang 1 buah lampuTKI 2x36 W mirror reflektor + battery nicad
Harga bahan:
- Lampu TL TKI 2x36W Miror Reflector with Battery Nicad bh 1.000 1,047,163.73 1,047,163.73
- Accecories ( 1 % alat ) % 1.000 1,047,163.73 10,471.64
Jumlah Harga Bahan 1,057,635.37
Upah tenaga:
- Instalator Oh 0.100 86,105.63 8,610.56
- Pekerja Oh 0.050 63,492.89 3,174.64
Err:508 Jumlah Upah Tenaga 11,785.21
Err:508 Jumlah Total 1,069,420.58
Err:508 Dibulatkan 1,069,420.00
28 Pasang 1 buah lampu PLC 18 W + battery nicad
Harga bahan:
- Lampu Downlight PLC 18 Watt with battery Nicad bh 1.000 733,214.96 733,214.96
- Accecories ( 1 % alat ) % 1.000 733,214.96 7,332.15
Jumlah Harga Bahan 740,547.10
Upah tenaga:
- Instalator Oh 0.100 86,105.63 8,610.56
- Pekerja Oh 0.050 63,492.89 3,174.64
Err:508 Jumlah Upah Tenaga 11,785.21
Err:508 Jumlah Total 752,332.31
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Err:508 Dibulatkan 752,330.00
29. Pasang 1 buah lampu TL 1x18 RM
Harga bahan:
- Lampu TL 1x18 watt RM bh 1.000 276,307.92 276,307.92
- Accecories ( 1 % alat ) % 1.000 276,307.92 2,763.08
Jumlah Harga Bahan 279,071.00
Upah tenaga:
- Instalator Oh 0.120 86,105.63 10,332.68
- Pekerja Oh 0.060 63,492.89 3,809.57
Err:508 Jumlah Upah Tenaga 14,142.25
Err:508 Jumlah Total 293,213.25
Err:508 Dibulatkan 293,210.00
30. Pasang 1 buah lampu TL 2x18 RM
Harga bahan:
- Lampu TL 2x18 watt RM bh 1.000 374,342.28 374,342.28
- Accecories ( 1 % alat ) % 1.000 374,342.28 3,743.42
Jumlah Harga Bahan 378,085.70
Upah tenaga:
- Instalator Oh 0.120 86,105.63 10,332.68
- Pekerja Oh 0.060 63,492.89 3,809.57
Err:508 Jumlah Upah Tenaga 14,142.25
Err:508 Jumlah Total 392,227.95
Err:508 Dibulatkan 392,220.00
31. Pasang 1 buah lampu TL 2x36 RM
Harga bahan:
- Lampu TL 2x36 watt RM bh 1.000 530,014.83 530,014.83
- Accecories ( 1 % alat ) % 1.000 530,014.83 5,300.15
Jumlah Harga Bahan 535,314.98
Upah tenaga:
- Instalator Oh 0.120 86,105.63 10,332.68
- Pekerja Oh 0.060 63,492.89 3,809.57
Err:508 Jumlah Upah Tenaga 14,142.25
Err:508 Jumlah Total 549,457.23
Err:508 Dibulatkan 549,450.00
32. Pasang 1 buah lampu TL 1x18 Balk
Harga bahan:
- Lampu TL 1x18 watt Balk bh 1.000 187,937.96 187,937.96
- Accecories ( 1 % alat ) % 1.000 187,937.96 1,879.38
Jumlah Harga Bahan 189,817.34
Upah tenaga:
- Instalator Oh 0.120 86,105.63 10,332.68
- Pekerja Oh 0.060 63,492.89 3,809.57
Err:508 Jumlah Upah Tenaga 14,142.25
Err:508 Jumlah Total 203,959.58
Err:508 Dibulatkan 203,950.00
33. Pasang 1 buah lampu TL 2x18 Balk
Harga bahan:
- Lampu TL 2x18 watt Balk bh 1.000 220,298.39 220,298.39
- Accecories ( 1 % alat ) % 1.000 220,298.39 2,202.98
Jumlah Harga Bahan 222,501.37
Upah tenaga:
- Instalator Oh 0.120 86,105.63 10,332.68
- Pekerja Oh 0.060 63,492.89 3,809.57
Err:508 Jumlah Upah Tenaga 14,142.25
Jumlah Total 236,643.62
Dibulatkan 236,640.00
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
HARGA
NO. URAIAN SAT KOFISEN SUB TOTAL (Rp) HSP (Rp)
SATUAN
1 2 3 4 5 6 7
Harga bahan:
- Stop kontak Broco bh 1.000 31,414.52 31,414.52
- Accecories ( 1 % alat ) % 1.000 31,414.52 314.15
Jumlah Harga Bahan 31,728.66
Upah tenaga:
- Instalator Oh 0.350 86,105.63 30,136.97
- Pekerja Oh 0.175 63,492.89 11,111.26
Err:508 Jumlah Upah Tenaga 41,248.23
Err:508 Jumlah Total 72,976.89
Err:508 Dibulatkan 72,970.00
42. Pasang 1 buah Exhaust Fan
Harga bahan:
- Exhaust Fan bh 1.000 276,708.61 276,708.61
- Accecories ( 1 % alat ) % 1.000 276,708.61 2,767.09
Jumlah Harga Bahan 279,475.69
Upah tenaga:
- Instalator Oh 0.350 86,105.63 30,136.97
- Pekerja Oh 0.175 63,492.89 11,111.26
Err:508 Jumlah Upah Tenaga 41,248.23
Err:508 Jumlah Total 320,723.92
Err:508 Dibulatkan 320,700.00
43. Pasang 1 buah out let TV
Harga bahan:
- outlet TV bh 1.00 35,000.00 35,000.00
- Accecories ( 1 % alat ) % 1.00 35,000.00 350.00
Jumlah Harga Bahan 35,350.00
Upah tenaga:
- Instalator Oh 0.35 86,105.63 30,136.97
- Pekerja Oh 0.175 63,492.89 11,111.26
Err:508 Jumlah Upah Tenaga 41,248.23
Err:508 Jumlah Total 76,598.23
Err:508 Dibulatkan 76,590.00
A PEKERJAAN PENDAHULUAN
1. Pagar sementara dari seng gelombang tinggi 2 meter tiap 1 m' 446,297.87
2. Pagar sementara dari kawat duri tinggi 1,8 meter tiap 1 m' 93,985.53
3. Pagar perimeter dari kawat duri tinggi 1,5 meter tiap 1 m' 117,455.03
4. Pagar perimeter dari kawat duri tinggi 70 cm tiap 1 m' 139,211.35
5. Pembuatan kantor sementara, dengan lantai plesteran tiap 1 m2 1,469,744.72
6. Pembuatan kantor sementara dengan lantai plesteran + meja & bangku kayu tiap 1 m2 #N/A
7. Pembuatan gudang semen dan peralatan tiap 1 m2 1,296,050.78
8. Pembuatan jalan sementara tebal 20 cm tiap 1 m2 133,026.13
9. Pembuatan jalan sementara tebal 25 cm tiap 1 m2 144,660.60
10. Pasang bouwplank tiap 1 m' 105,795.64
11. Membersihkan puing-puing tiap 1 m2 12,698.58
12. Papan nama proyek 764,592.88
13. Pengukuran dan Stacking Out / 35 m2 614,558.31
B PEKERJAAN TANAH
1. Pembersihan lapangan dan perataan tiap 1 m2 11,219.91
2. Pekerjaan stripping setinggi 1 meter tiap 1 m3 3,661.71
3. Pekerjaan stripping Top Soil setinggi 20 cm tiap 1 m2 25,815.68
4. Galian tanah biasa sedalam 1 meter tiap 1 m3 50,054.98
5. Galian tanah biasa sedalam 2 meter tiap 1 m3 61,527.16
6. Galian tanah biasa sedalam 3 meter tiap 1 m3 73,194.16
7. Galian tanah keras sedalam 1 meter tiap 1 m3 66,610.08
8. Galian tanah cadas sedalam 1 meter tiap 1 m3 101,084.08
9. Galian tanah lumpur sedalam 1 meter tiap 1 m3 80,575.02
10. Pembuangan tanah sejauh 150 m tiap 1 m3 37,632.95
11. Urugan tanah kembali tiap 1 m3 16,681.74
12. Urugan tanah mendatangkan tiap 1 m3 108,230.63
13. Mengangkut tanah sejauh 30 m tiap 1 m3 21,926.78
14. Menghampar tanah dengan menghampar tiap 1 m3 16,847.35
15. Pemadatan tanah (tenaga manusia) tiap 1 m3 36,617.06
16. Pemadatan tanah (tenaga manusia) tebal 20 cm tiap 1 m2 7,323.41
17. Pemadatan tanah dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m3 8,617.36
18. Pemadatan tanah tebal 20 cm dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m2 1,725.26
19. Pemadatan tanah dengan tamper/hand compactor 10 lintasan / tebal 20cm tiap 1 m3 14,362.27
20. Pemadatan tanah tebal 20 cm dengan tamper/hand compactor 10 lintasan / tebal 20cm tiap 1 m2 2,872.45
21. Pemadatan tanah dengan Vibrating Roller tiap 1 m3 1,436.23
22. Pemadatan tanah tebal 20 cm dengan Vibrating Roller tiap 1 m2 302.36
23. Urugan sirtu tiap 1 m3 105,094.45
24. Urugan pasir urug tiap 1 m3 113,921.51
25. Urugan tanah merah tiap 1 m3 108,230.63
26. Urugan pasir pasang tiap 1 m3 446,837.99
27. Pemancangan tiang/cerucuk dolken dia 8 - 10 / 400 cm dalam 2 m' tiap 1 titik 14,295.97
28. Pemancangan tiang/cerucuk dolken dia 8 - 10 / 400 cm dalam 4 m' tiap 1 titik 28,591.95
29. Pemasangan lapisan ijuk tiap 1 m2 56,559.55
E PEKERJAAN PLESTERAN
1. Plesteran 1 Pc : 2 Ps tebal 15 mm tiap 1m2 55,201.51
2. Plesteran 1 Pc : 3 Ps tebal 15 mm tiap 1m2 52,543.87
3. Plesteran 1 Pc : 4 Ps tebal 15 mm tiap 1m2 50,562.49
4. Plesteran texture/ Skrit tiap 1 m2 242,854.32
5. Plesteran 1 Pc : 2 Ps tebal 20 mm tiap 1m2 64,799.10
6. Plesteran 1 Pc : 3 Ps tebal 20 mm tiap 1m2 61,255.57
7. Plesteran 1 Pc : 4 Ps tebal 20 mm tiap 1m2 58,495.18
8. Plesteran 1 Pc : 2 Ps tebal 25 mm tiap 1m2 65,201.49
9. Plesteran 1 Pc : 3 Ps tebal 25 mm tiap 1m2 67,320.75
10. Plesteran 1 Pc : 4 Ps tebal 25 mm tiap 1m2 64,933.94
11. Plesteran dinding dengan mortar tiap 1m2 50,151.05
12. Plesteran Berapen 1 Pc : 3 Ps tebal 15 mm tiap 1m2 34,367.61
13. Plesteran Berapen 1 Pc : 5 Ps tebal 15 mm tiap 1m2 33,276.42
14. Plesteran Skoning (benangan/ tali air) 1 Pc : 2 Ps lebar 10 cm / tiap 1m' 15,409.92
15. Plesteran Ciprat 1 Pc : 2 Ps tiap 1m2 34,186.56
16. Plesteran Siar 1 Pc : 2 Ps untuk pasangan batu kali tiap 1m2 46,099.55
17. Acian 1 m2 23,588.10
18. Acian dengan mortar tiap 1m2 18,643.16
19. Pasang Rock wall density 93 kg / m3 tebal 5 cm c/w hole Ø 8 x 8 / m2 47,500.00
F PEKERJAAN KUSEN DAN DAUN PINTU/JENDELA KAYU
1. Pasang kusen pintu dan jendela Kayu Jati tiap 1m3 48,363,040.42
2. Pasang kusen pintu dan jendela Kayu Kamper Samarinda Oven tiap 1m3 10,330,624.76
3. Pasang kusen pintu dan jendela Kayu Kamper Medan/Kruing tiap 1m3 7,727,584.00
4. Pasang kusen pintu dan jendela Kayu Meranti Palembang tiap 1m3 7,194,153.16
5. Pasang kusen pintu dan jendela Kayu Borneo tiap 1m3 5,457,819.20
6. Pasang pintu panel Kayu Jati tiap 1m2 1,969,663.23
7. Pasang pintu panel Kayu Kamper Samarinda Oven tiap 1m2 573,518.25
8. Pasang pintu panel Kayu Kamper Medan/Kruing tiap 1m2 564,090.35
9. Pasang pintu panel Kayu Borneo tiap 1m2 411,091.39
10. Pasang pintu panel Kayu Meranti Sampit tiap 1m2 505,715.96
11. Pasang pintu dan jendela kaca Kayu Jati tiap 1m2 1,237,170.29
12. Pasang pintu dan jendela kaca Kayu Kamper Samarinda Oven tiap 1m2 399,483.31
13. Pasang pintu dan jendela kaca Kayu Kamper Medan/Kruing tiap 1m2 393,826.57
14. Pasang pintu dan jendela kaca Kayu Meranti Sampit tiap 1m2 358,801.94
15. Pasang pintu dan jendela kaca Kayu Borneo tiap 1m2 302,027.19
16. Pasang pintu dan jendela jalusi Kayu Jati tiap 1m2 3,020,147.24
17. Pasang pintu dan jendela jalusi Kayu Kamper Samarinda Oven tiap 1m2 786,315.27
18. Pasang pintu dan jendela jalusi Kayu Kamper Singkil tiap 1m2 671,165.72
19. Pasang pintu dan jendela jalusi Kayu Kamper Medan/Kruing tiap 1m2 771,230.65
20. Pasang pintu dan jendela jalusi Kayu Meranti Sampit tiap 1m2 677,831.62
182
RINGKASAN HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
0
bil asli
3,063,788,540.00
3,063,788,541
bil asli dlm tex Rupiah
3063788540
540.00 Lima Ratus Empat Puluh
788.00 Tujuh Ratus Delapan Puluh Delapan
63.00 Enam Puluh Tiga
3.00 Tiga
-
-
Rupiah
Lima Ratus Empat Puluh
Tujuh Ratus Delapan Puluh Delapan ribu
Enam Puluh Tiga juta
Tiga milyar
3063788540
Tiga Milyar Enam Puluh Tiga Juta Tujuh Ratus Delapan
Tiga milyar enam puluh tiga juta tujuh ratus delapan
bil asli
19,064,958.00
19,064,958
bil asli dlm tex 58/100 Rupiah
19064958
958.00 Sembilan Ratus Lima Puluh Delapan
64.00 Enam Puluh Empat
19.00 Sembilan Belas
-
-
58/100 Rupiah
Sembilan Ratus Lima Puluh Delapan
Enam Puluh Empat ribu
Sembilan Belas juta
19064958
Sembilan Belas Juta Enam Puluh Empat Ribu Sembilan
Sembilan belas juta enam puluh empat ribu sembila
2,003.00 2,003.00 Masukan tanggal
bil asli
2,003.00
2003.00
bil asli dlm tex
2003
3.00 Tiga
2.00 Dua
-
-
-
-
Tiga
Dua ribu
2003
Dua ribu Tiga
Dua ribu tiga
bil asli
-
0.00
bil asli dlm tex Rupiah
0
- nol
-
-
-
-
-
Rupiah
0
Rupiah
nol Rupiah
/100 Rupiah
Bil Pecahan ambil dari format utama text
elapan ribu
Juta Tujuh Ratus Delapan Puluh Delapan Ribu Lima Ratus Empat Puluh Rupiah
juta tujuh ratus delapan puluh delapan ribu lima ratus empat puluh rupiah
luh Empat Ribu Sembilan Ratus Lima Puluh Delapan 58/100 Rupiah
uluh empat ribu sembilan ratus lima puluh delapan 58/100 rupiah
Bil Pecahan ambil dari format utama text