RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : REHABILITASI DAN RENOVASI SARANA DAN PRASARANA SEKOLAH
PEKERJAAN : PERENCANAAN REHABILITASI GEDUNG KAB. MANGGARAI
LOKASI : KEC. SATAR MESE BARAT
SEKOLAH : SDI BEA SUHANG
GEDUNG : REHAB A, (3 RUANG KELAS)
TAHUN ANGARAN : 2022
1 2 3 4 5 6=4x5 7 = 10% x 6
VI PEKERJAAN PASANGAN DAN PLESTERAN
JUMLAH SUB VI
1 Keramik uk. 40 x 40 (Ruang Kelas dan Selasar) M² 209.72 177,261.03 37,175,625.32 3,717,562.53
2 Plint Keramik uk 10 x 40 (Ruang Kelas) M' 102.30 54,455.00 5,570,746.50 557,074.65
1 2 3 4 5 6=4x5 7 = 10% x 6
JUMLAH SUB IX
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : REHABILITASI DAN RENOVASI SARANA DAN PRASARANA SEKOLAH
PEKERJAAN : PERENCANAAN REHABILITASI GEDUNG KAB. MANGGARAI
LOKASI : KEC. SATAR MESE BARAT
SEKOLAH : SDI BEA SUHANG
GEDUNG : REHAB A, (3 RUANG KELAS)
TAHUN ANGARAN : 2022
1 2 3 4 5 6=4x5 7 = 10% x 6
X PEKERJAAN PENGECATAN
A INTERIOR
JUMLAH SUB X
XI PEKERJAAN LISTRIK
1 Pek. Instalasi Listrik dari Panel ke Titik Lampu, Stop Kontak, & Saklar Titik 37.00 257,680.50 9,534,178.50 953,417.85
2 Pas. Stop Kontak bh 3.00 87,098.00 261,294.00 26,129.40
3 Pas. Saklar Ganda bh 6.00 81,598.00 489,588.00 48,958.80
4 Pas. Lampu Philips LED 12 watt + Fitting Tempel (Luar) bh 16.00 208,230.00 3,331,680.00 333,168.00
5 Pas. Lampu TL 2 x 36 watt + Fitting Tempel (Dalam) bh 12.00 526,460.00 6,317,520.00 631,752.00
JUMLAH SUB XI
TOTAL HARGA
(Rp)
8=6+7
5,518,479.89
1,922,836.03
301,786.95
2,716,837.20
945,459.35
11,405,399.42
1,382,014.39
4,796,348.04
288,944.17
2,717,966.06
401,662.04
9,586,934.71
904,588.48
2,904,887.12
608,508.52
904,588.48
2,904,887.12
967,675.82
29,564,965.86
3,430,671.69
42,190,773.08
NGGARAN BIAYA (RAB)
TOTAL HARGA
(Rp)
8=6+7
3,707,311.33
2,527,926.77
4,250,123.46
17,937,316.55
28,422,678.12
40,893,187.85
6,127,821.15
47,021,009.00
1,239,970.27
5,246,409.31
1,848,105.60
1,522,276.80
363,897.32
476,717.61
761,138.40
792,828.30
500,195.85
6,650,421.94
1,819,486.61
2,383,588.04
11,417,076.00
11,892,424.50
7,502,937.75
54,417,474.29
63,755,230.82
13,781,384.80
65,489,689.90
58,588,245.02
2,635,092.50
754,950.93
NGGARAN BIAYA (RAB)
TOTAL HARGA
(Rp)
8=6+7
205,004,593.96
NGGARAN BIAYA (RAB)
TOTAL HARGA
(Rp)
8=6+7
4,282,055.20
18,832,719.40
6,831,600.93
567,524.59
4,891,285.25
1,228,553.46
36,633,738.83
10,487,596.35
287,423.40
538,546.80
3,664,848.00
6,949,272.00
21,927,686.55
445,204,888.55
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : REHABILITASI DAN RENOVASI SARANA DAN PRASARANA SEKOLAH
PEKERJAAN : PERENCANAAN REHABILITASI GEDUNG KAB. MANGGARAI
LOKASI : KEC. SATAR MESE BARAT
SEKOLAH : SDI BEA SUHANG
GEDUNG : REHAB B, (2 RUANG KELAS)
TAHUN ANGARAN : 2022
1 2 3 4 5 6=4x5 7 = 10% x 6
I PEKERJAAN PERSIAPAN
JUMLAH SUB I
II PEKERJAAN BONGKARAN
JUMLAH SUB II
IV PEKERJAAN STRUKTUR
1 Rabat Beton Lantai Ruang Kelas dan Selasar (T = 10cm) M³ 18.23 1,027,270.24 18,723,540.99 1,872,354.10
2 Rabat Beton Lantai Saluran (T = 5cm) M³ 2.48 1,027,270.24 2,551,739.27 255,173.93
JUMLAH SUB IV
JUMLAH SUB V
VI PEKERJAAN LANTAI
1 Keramik uk. 40 x 40 (Ruang Kelas dan Selasar) M² 140.07 177,261.03 24,828,419.99 2,482,842.00
2 Plint Keramik uk 10 x 40 (Ruang Kelas) M' 66.04 54,455.00 3,596,208.20 359,620.82
JUMLAH SUB VI
VII PEKERJAAN PINTU/ JENDELA
1 PINTU TYPE P1 (Jumlah = 2 unit)
a. Pembuatan dan pemasangan kusen (Kayu Kelas I) 6/12 bersih M³ - 5,056,909.00 - -
b. Pembuatan dan pemasangan daun pintu M² 6.80 923,241.00 6,281,731.76 628,173.18
c. Pemasangan kunci tanam biasa Bh 2.00 560,032.00 1,120,064.00 112,006.40
d. Pemasangan engsel pintu (1 daun pintu 3 engsel) Bh 12.00 115,324.00 1,383,888.00 138,388.80
HARGA SATUAN JUMLAH HARGA PPN
NO URAIAN PEKERJAAN SAT. VOL
(Rp) (Rp) 10%
1 2 3 4 5 6=4x5 7 = 10% x 6
e. Pemasangan Pengunci/Spring Knip Bh 4.00 151,574.50 606,298.00 60,629.80
2 JENDELA TYPE J1 (Jumlah = 15 unit)
a. Pembuatan dan pemasangan kusen Jendela & jalusi (Kayu Kelas I) M³ 0.97 5,056,909.00 4,922,597.50 492,259.75
b. Pembuatan dan pemasangan daun jendela kaca M² 0.30 723,569.00 217,070.70 21,707.07
c. Pemasangan kaca polos tebal 5 mm M² 0.66 370,315.00 244,407.90 24,440.79
e. Pemasangan engsel Jendela Bh 2.00 115,324.00 230,648.00 23,064.80
f. Pemasangan kait angin Bh 2.00 120,125.50 240,251.00 24,025.10
g. Pemasangan Pengunci/Spring Knip Bh 1.00 151,574.50 151,574.50 15,157.45
1 2 3 4 5 6=4x5 7 = 10% x 6
VIII PEKERJAAN ATAP DAN PLAFOND
X PEKERJAAN PENGECATAN
A INTERIOR
JUMLAH SUB X
IX PEKERJAAN LISTRIK
1 Pek. Instalasi Listrik dari Panel ke Titik Lampu, Stop Kontak, & Saklar Titik 18.00 257,680.50 4,638,249.00 463,824.90
2 Pas. Stop Kontak bh 2.00 87,098.00 174,196.00 17,419.60
3 Pas. Saklar Ganda bh 4.00 81,598.00 326,392.00 32,639.20
4 Pas. Lampu Philips LED 12 watt + Fitting Tempel (Luar) bh 4.00 208,230.00 832,920.00 83,292.00
5 Pas. Lampu TL 2 x 36 watt + Fitting Tempel (Dalam) bh 8.00 526,460.00 4,211,680.00 421,168.00
JUMLAH SUB IX
TOTAL HARGA
(Rp)
8=6+7
3,804,000.70
238,394.08
908,857.51
4,951,252.29
1,130,739.05
3,197,565.36
236,408.86
1,353,772.93
1,809,529.83
328,632.58
8,056,648.61
20,595,895.09
2,806,913.20
23,402,808.29
7,339,568.92
3,033,254.73
2,068,303.72
7,103,215.60
20,608,831.78
40,153,174.75
27,311,261.99
3,955,829.02
31,267,091.01
-
6,909,904.94
1,232,070.40
1,522,276.80
TOTAL HARGA
(Rp)
8=6+7
666,927.80
5,414,857.25
238,777.77
268,848.69
253,712.80
264,276.10
166,731.95
16,938,384.50
TOTAL HARGA
(Rp)
8=6+7
44,921,795.03
4,187,344.15
39,946,276.71
1,714,548.83
754,950.93
91,524,915.64
3,093,364.40
13,854,974.44
4,554,400.62
567,524.59
3,705,519.13
921,415.10
26,697,198.27
5,102,073.90
191,615.60
359,031.20
916,212.00
4,632,848.00
11,201,780.70
254,193,254.07
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : REHABILITASI DAN RENOVASI SARANA DAN PRASARANA SEKOLAH
PEKERJAAN : PERENCANAAN REHABILITASI GEDUNG KAB. MANGGARAI
LOKASI : KEC. SATAR MESE BARAT
SEKOLAH : SDI BEA SUHANG
GEDUNG : REHAB C, 2 RUANG KELAS
TAHUN ANGARAN : 2022
1 2 3 4 5 6=4x5 7 = 10% x 6
I PEKERJAAN PERSIAPAN
JUMLAH SUB I
II PEKERJAAN BONGKARAN
JUMLAH SUB II
V PEKERJAAN STRUKTUR
1 Rabat Beton Lantai Ruang Kelas dan Selasar (T = 10cm) M³ 18.23 1,027,270.24 18,723,540.99 1,872,354.10
2 Rabat Beton Lantai Saluran (T = 5cm) M³ 2.48 1,027,270.24 2,551,739.27 255,173.93
JUMLAH SUB V
JUMLAH SUB VI
1 Keramik uk. 40 x 40 (Ruang Kelas dan Selasar) M² 140.07 177,261.03 24,828,419.99 2,482,842.00
2 Plint Keramik uk 10 x 40 (Ruang Kelas) M' 66.04 54,455.00 3,596,208.20 359,620.82
1 2 3 4 5 6=4x5 7 = 10% x 6
JUMLAH SUB X
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : REHABILITASI DAN RENOVASI SARANA DAN PRASARANA SEKOLAH
PEKERJAAN : PERENCANAAN REHABILITASI GEDUNG KAB. MANGGARAI
LOKASI : KEC. SATAR MESE BARAT
SEKOLAH : SDI BEA SUHANG
GEDUNG : REHAB C, 2 RUANG KELAS
TAHUN ANGARAN : 2022
1 2 3 4 5 6=4x5 7 = 10% x 6
X PEKERJAAN PENGECATAN
A INTERIOR
JUMLAH SUB X
XI PEKERJAAN LISTRIK
1 Pek. Instalasi Listrik dari Panel ke Titik Lampu, Stop Kontak, & Saklar Titik 18.00 257,680.50 4,638,249.00 463,824.90
2 Pas. Stop Kontak bh 2.00 87,098.00 174,196.00 17,419.60
3 Pas. Saklar Ganda bh 4.00 81,598.00 326,392.00 32,639.20
4 Pas. Lampu Philips LED 12 watt + Fitting Tempel (Luar) bh 4.00 208,230.00 832,920.00 83,292.00
5 Pas. Lampu TL 2 x 36 watt + Fitting Tempel (Dalam) bh 8.00 526,460.00 4,211,680.00 421,168.00
JUMLAH SUB XI
TOTAL HARGA
(Rp)
8=6+7
3,804,000.70
238,394.08
908,857.51
4,951,252.29
1,130,739.05
236,408.86
1,809,529.83
328,632.58
3,197,565.36
1,353,772.93
4,551,338.29
20,595,895.09
2,806,913.20
23,402,808.29
10,594,320.25
3,033,254.73
2,068,303.72
7,103,215.60
20,608,831.78
29,780,351.10
27,311,261.99
3,955,829.02
31,267,091.01
39,946,276.71
881,266.89
36,691,351.50
NA ANGGARAN BIAYA (RAB)
TOTAL HARGA
(Rp)
8=6+7
77,518,895.09
NA ANGGARAN BIAYA (RAB)
TOTAL HARGA
(Rp)
8=6+7
2,791,927.39
14,652,994.37
4,554,400.62
709,405.74
3,705,519.13
921,415.10
5,336,339.96
5,102,073.90
191,615.60
359,031.20
916,212.00
4,632,848.00
11,201,780.70
188,009,856.74
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : REHABILITASI DAN RENOVASI SARANA DAN PRASARANA SEKOLAH
PEKERJAAN : PERENCANAAN REHABILITASI GEDUNG KAB. MANGGARAI
LOKASI : KEC. SATAR MESE BARAT
SEKOLAH : SDI BEA SUHANG
GEDUNG : REHAB D, 1 RUANG PERPUSTAKAAN
TAHUN ANGARAN : 2022
1 2 3 4 5 6=4x5 7 = 10% x 6
I PEKERJAAN PERSIAPAN
JUMLAH SUB I
II PEKERJAAN BONGKARAN
JUMLAH SUB II
V PEKERJAAN STRUKTUR
1 Sloof 15/25
JUMLAH SUB V
JUMLAH SUB VI
1 Keramik uk. 40 x 40 (Ruang Kelas dan Selasar) M² 69.91 177,261.03 12,391,875.11 1,239,187.51
2 Plint Keramik uk 10 x 40 (Ruang Kelas) M' 102.30 54,455.00 5,570,746.50 557,074.65
1 2 3 4 5 6=4x5 7 = 10% x 6
VIII PEKERJAAN PINTU/ JENDELA
1 PINTU TYPE PJ1 (Jumlah = 3 unit)
a. Pembuatan dan pemasangan kusen (Kayu Kelas I) 6/12 bersih M³ 0.10 5,056,909.00 511,192.82 51,119.28
b. Pembuatan dan pemasangan daun pintu M² 1.81 923,241.00 1,667,373.25 166,737.32
f. Pemasangan kaca polos tebal 5 mm M² 0.78 370,315.00 288,919.76 28,891.98
2 JENDELA TYPE J1 (Jumlah = 15 unit)
a. Pembuatan dan pemasangan kusen Jendela & jalusi (Kayu Kelas I) M³ 0.40 5,056,909.00 2,015,279.37 201,527.94
b. Pembuatan dan pemasangan daun jendela kaca M² 0.76 723,569.00 551,359.58 55,135.96
c. Pemasangan kaca polos tebal 5 mm M² 1.95 370,315.00 722,299.41 72,229.94
JUMLAH SUB IX
X PEKERJAAN PENGECATAN
A INTERIOR
JUMLAH SUB X
XI PEKERJAAN LISTRIK
1 Pek. Instalasi Listrik dari Panel ke Titik Lampu, Stop Kontak, & Saklar Titik 11.00 257,680.50 2,834,485.50 283,448.55
JUMLAH SUB XI
TOTAL HARGA
(Rp)
8=6+7
4,583,850.61
177,349.10
905,612.40
5,666,812.10
795,705.26
166,361.79
903,541.14
231,259.96
2,096,868.16
317,509.57
1,165,901.53
243,403.41
11,626,824.33
1,975,235.21
15,328,874.05
7,455,262.40
2,134,512.59
1,455,472.99
11,045,247.97
13,631,062.62
6,127,821.15
19,758,883.77
TOTAL HARGA
(Rp)
8=6+7
562,312.10
1,834,110.57
317,811.74
2,216,807.31
606,495.54
794,529.35
6,332,066.60
26,088,359.24
6,000,682.86
24,486,614.26
24,755,439.09
985,261.86
2,630,936.58
84,947,293.88
1,492,924.07
10,272,745.23
2,277,200.31
494,443.13
2,519,753.01
632,891.18
17,689,956.92
3,117,934.05
287,423.40
77,657.80
179,515.60
458,106.00
2,316,424.00
6,437,060.85
169,303,064.30
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : REHABILITASI DAN RENOVASI SARANA DAN PRASARANA SEKOLAH
PEKERJAAN : PERENCANAAN REHABILITASI GEDUNG KAB. MANGGARAI
LOKASI : KEC. SATAR MESE BARAT
SEKOLAH : SDI BEA SUHANG
GEDUNG : REKONSTRUKSI TOILET
TAHUN ANGARAN : 2022
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6=4x5
I PEKERJAAN PERSIAPAN
JUMLAH SUB I
II PEKERJAAN BONGKARAN
JUMLAH SUB II
IV PEKERJAAN PONDASI
JUMLAH SUB IV
V PEKERJAAN STRUKTUR
1 Sloff 15/20
1 2 3 4 5 6=4x5
4 Balok Gewel 10/15
JUMLAH SUB V
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6=4x5
VI PEKERJAAN PASANGAN DAN PLESTERAN
JUMLAH SUB VI
JUMLAH SUB IX
X PEKERJAAN PENGECATAN
JUMLAH SUB X
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT. VOL SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6=4x5
XI PEKERJAAN LISTRIK
1 Pek. Instalasi Listrik dari Panel ke Titik Lampu, Stop Kontak, & Saklar Titik 6.00 257,680.50 1,546,083.00
2 Pas. Saklar Ganda bh 2.00 81,598.00 163,196.00
3 Pas. Saklar Tunggal bh 2.00 70,598.00 141,196.00
4 Pas. Lampu Philips LED 12 watt + Fitting Tempel bh 6.00 208,230.00 1,249,380.00
JUMLAH SUB XI
JUMLAH XIII
7 = 10% x 6 8=6+7
60,918.66 670,105.26
44,388.85 488,277.35
JUMLAH SUB II -
929,973.73 10,229,711.05
145,825.45 1,604,079.90
136,389.02 1,500,279.17
56,961.06 626,571.62
249,788.48 2,747,673.28
210,359.65 2,313,956.11
1,434,582.89 15,780,411.76
145,997.48 1,605,972.31
378,859.70 4,167,456.74
105,226.28 1,157,489.03
114,811.63 1,262,927.88
523,357.53 5,756,932.82
328,978.82 3,618,766.97
97,331.66 1,070,648.21
347,399.24 3,821,391.59
203,604.56 2,239,650.11
PPN TOTAL HARGA
10% (Rp)
7 = 10% x 6 8=6+7
19,069.06 209,759.65
86,640.07 953,040.72
39,889.87 438,788.59
7 = 10% x 6 8=6+7
1,715,154.20 18,866,696.20
62,995.23 692,947.58
42,226.74 464,494.14
1,069,996.12 11,769,957.33
758,398.12 8,342,379.32
523,524.52 5,758,769.70
735,746.84 8,093,215.26
101,494.30 1,116,437.29
205,543.18 2,260,975.02
401,217.37 4,413,391.07
224,012.80 2,464,140.80
138,388.80 1,522,276.80
60,629.80 666,927.80
543,346.07 5,976,806.72
486,087.08 5,346,957.93
65,859.75 724,457.25
162,033.85 1,782,372.35
508,954.33 5,598,497.58
2,514,621.37 27,660,835.10
741,017.84 8,151,196.27
398,733.11 4,386,064.18
36,542.06 401,962.61
7 = 10% x 6 8=6+7
154,608.30 1,700,691.30
16,319.60 179,515.60
14,119.60 155,315.60
124,938.00 1,374,318.00
810,000.00 8,910,000.00
1,038,169.00 11,419,859.00
467,665.00 5,144,315.00
292,143.50 3,213,578.50
325,776.00 3,583,536.00
266,684.00 2,933,524.00
376,332.00 4,139,652.00
129,092.70 1,420,019.70
469,496.40 5,164,460.40
HARGA
JUMLAH HARGA PPN
NO URAIAN PEKERJAAN SAT. VOLUME SATUAN
(Rp) 10%
(Rp)
1 2 3 4 5 6=4x5 7 = 10% x 6
JUMLAH SUB I
II PEKERJAAN TANAH / URUGAN
1 Pemadatan Tanah asli Ls 1.00 45,925.00 45,925.00 4,592.50
2 Urugan Sirtu Peninggi Lantai M³ 54.60 263,712.50 14,398,702.50 1,439,870.25
3 Urugan Pasir Bawah Lantai (T = 5cm) M³ 18.20 240,545.00 4,377,919.00 437,791.90
JUMLAH SUB II
III PEKERJAAN STRUKTUR
1 Rabat Lantai Tulangan
a. Beton fc 21,7 Mpa M³ 36.40 1,324,240.21 48,202,343.51 4,820,234.35
b. Pembesian Kg 268.87 21,672.59 5,827,036.09 582,703.61
2 Pemasangan Buis Beton
a. Pas. Rollag bata merah M² 48.00 241,021.03 11,569,009.28 1,156,900.93
b. Pas. Buis Beton M' 80.00 196,252.10 15,700,168.00 1,570,016.80
8=6+7
2,436,746.40
2,436,746.40
50,517.50
15,838,572.75
4,815,710.90
20,704,801.15
53,022,577.86
6,409,739.70
12,725,910.21
17,270,184.80
89,428,412.57
3,564,000.00
512,647.96
4,076,647.96
116,646,608.08
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : REHABILITASI DAN RENOVASI SARANA DAN PRASARANA SEKOLAH
PEKERJAAN : PERENCANAAN REHABILITASI GEDUNG KAB. MANGGARAI
LOKASI : KEC. SATAR MESE BARAT
SEKOLAH : SDI BEA SUHANG
GEDUNG : PAGAR DAN GAPURA
TAHUN ANGARAN : 2022
HARGA
JUMLAH HARGA PPN
NO URAIAN PEKERJAAN SAT. VOL SATUAN
(Rp) 10%
(Rp)
1 2 3 4 5 6=4x5 7 = 10% x 6
A GAPURA
I PEKERJAAN PERSIAPAN GAPURA
1 Pemasangan bouwplank M' 26.00 27,690.30 719,947.80 71,994.78
JUMLAH SUB I
II PEKERJAAN TANAH / URUGAN PAGAR DAN GAPURA
JUMLAH SUB V
VI PEKERJAAN ATAP , PENGECATAN GAPURA
1 Pas Atap BJLS + Rangka Baja Ringan m2 14.40 241,009.46 3,470,536.29 347,053.63
2 Pas Nok m' 6.00 44,091.67 264,550.00 26,455.00
3 Pengecatan Dinding Tembok + Beton (Gapura) M² 31.08 42,305.56 1,314,856.80 131,485.68
4 Pembuatan Lobang Variasi + Lis Bh 12.00 107,136.46 1,285,637.50 128,563.75
5 Pembuartan Lis Ornamen M' 38.90 77,371.67 3,009,757.89 300,975.79
JUMLAH SUB VI
VII PEKERJAAN LAIN-LAIN GAPURA
1 Huruf Timbul Stainless Steel Ls 1.00 8,695,734.50 8,695,734.50 869,573.45
JUMLAH SUB VII
JUMLAH TOTAL GAPURA
B PAGAR 23 M + 23 M
I PEKERJAAN PERSIAPAN PAGAR
1 Pemasangan bouwplank M' 46.00 27,690.30 1,273,753.80 127,375.38
JUMLAH SUB I
II PEKERJAAN TANAH / URUGAN PAGAR
1 Galian Tanah Pondasi Menerus M³ 29.44 100,933.25 2,971,474.88 297,147.49
2 Urugan Tanah Kembali Hasil Galian Pondasi Menerus M³ 9.81 63,307.75 621,260.05 62,126.01
3 Urug Pasir Bawah Pondasi m3 1.84 472,455.50 869,318.12 86,931.81
JUMLAH SUB II
III PEKERJAAN PONDASI PAGAR
1 Pas Pondasi Batu Kali Amstamping m3 7.36 357,754.50 2,633,073.12 263,307.31
2 Pas Pondasi Batu Kali m3 12.42 578,250.05 7,181,865.62 718,186.56
TOTAL HARGA
(Rp)
8=6+7
791,942.58
791,942.58
541,809.69
113,278.67
124,728.25
779,816.61
3,777,887.52
1,373,922.12
112,999.73
436,999.27
546,004.93
39,258.45
6,287,072.01
367,079.39
711,630.50
105,182.15
1,234,522.93
6,169,753.51
1,067,724.57
728,332.11
1,547,630.30
250,433.70
318,645.30
687,893.96
109,564.74
13,298,393.17
4,952,500.06
1,678,660.20
1,144,638.17
7,775,798.43
3,817,589.92
291,005.00
1,446,342.49
1,414,201.25
3,310,733.67
10,279,872.32
9,565,307.95
9,565,307.95
48,778,203.07
1,401,129.18
1,401,129.18
3,268,622.37
683,386.06
956,249.93
4,908,258.36
2,896,380.43
7,900,052.18
10,796,432.62
2,010,196.63
5,981,407.61
633,863.04
2,307,356.14
4,532,430.56
3,966,869.81
1,340,131.09
4,503,338.53
1,051,264.34
26,326,857.74
21,952,195.11
8,944,212.66
6,098,844.31
10,842,209.55
3,502,572.48
51,340,034.11
94,772,712.01
143,550,915.08
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : REHABILITASI DAN RENOVASI SARANA DAN PRASARANA SEKOLAH
PEKERJAAN : PERENCANAAN REHABILITASI GEDUNG KAB. MANGGARAI
LOKASI : KEC. SATAR MESE BARAT
SEKOLAH : SDI BEA SUHANG
GEDUNG : TOWER DAN BAK AIR
TAHUN ANGARAN : 2022
HARGA JUMLAH
PPN TOTAL HARGA
NO URAIAN PEKERJAAN SAT. VOL SATUAN HARGA
10% (Rp)
(Rp) (Rp)
1 Kolom 20/25
1 Pemasangan dan Perakitan Besi L 70.70.7 Kg 537.26 32,158.50 17,277,604.34 1,727,760.43 19,005,364.78
2 Pemasangan dan Perakitan Besi L 50.50.5 Kg 143.64 32,158.50 4,619,246.94 461,924.69 5,081,171.63
1 Plesteran Dinding dan Pelat beton, 1Pc : 5Psr M² 30.95 49,100.86 1,519,671.62 151,967.16 1,671,638.78
2 Acian Dinding & Pelat Beton M² 30.95 33,480.70 1,036,227.67 103,622.77 1,139,850.43
1 Pengecatan Dinding & Pelat Beton Bak Air M² 30.95 42,305.56 1,309,357.08 130,935.71 1,440,292.79
2 Pengecetan Besi L 70.70.7 M² 203.84 52,959.50 10,795,264.48 1,079,526.45 11,874,790.93
3 Pengecetan Besi L 50.50.5 M² 76.00 52,959.50 4,024,922.00 402,492.20 4,427,414.20
1 Instalasi Pipa Bak Ke Tower E 1,5" M1 12.00 165,088.00 1,981,056.00 198,105.60 2,179,161.60
b. Tee Gip Dia 1" ke Dia 3/4" Bh 2.00 32,554.06 65,108.12 6,510.81 71,618.94
3 Instalasi Pipa Tower outlet Ke kamar mandi 3/4" Kom M² 10.00 87,954.63 879,546.25 87,954.63 967,500.88
a. Tee Gip Dia 3/4" ke Dia 1/2" Bh 3.00 21,179.83 63,539.48 6,353.95 69,893.43
1 Tandon Stainless Plus Onkos Kerja /Biaya Instalasi Bh 1.00 1,790,030.00 1,790,030.00 179,003.00 1,969,033.00
2 Penutup Mainhole Bak Air Ls 1.00 330,000.00 330,000.00 33,000.00 363,000.00
3 Pompa Transfer Unit 1.00 3,719,100.00 3,719,100.00 371,910.00 4,091,010.00
1. merk/Type Grundfos NS 4-23m
2. Kapasitas 60 Liter/menit
3. Keinggian samoai dengan 18 m
4. Daya sampai 750 Watt
4 Strainer Dia. 1 1/2" sekualitas OND Bh 1.00 1,747,218.00 1,747,218.00 174,721.80 1,921,939.80
5 Check Valve Dia. 1 1/2" sekualitas OND Bh 1.00 552,444.75 552,444.75 55,244.48 607,689.23
6 Ball Valve Dia. 1 1/2" sekualitas OND Bh 1.00 605,993.73 605,993.73 60,599.37 666,593.10
HARGA JUMLAH
PPN TOTAL HARGA
NO URAIAN PEKERJAAN SAT VOL SATUAN HARGA
10% (Rp)
(Rp) (Rp)
JUMLAH I 145,953.38
II PEKERJAAN PONDASI
1 Pasangan pondasi menerus 1 Pc : 5 Ps M³ 0.23 578,250.05 130,106.26 13,010.63 143,116.89
JUMLAH II 143,116.89
2 Sloof 15x20 cm
a Beton fc 21,7 Mpa M³ 0.03 1,324,240.21 39,727.21 3,972.72 43,699.93
b Pembesian Sloof Kg 4.65 21,672.59 100,742.85 10,074.29 110,817.14
c Bekisting (2x pakai) M² 0.40 71,582.50 28,633.00 2,863.30 31,496.30
3 Ringbalk 9x12 cm
a Beton fc 21,7 Mpa M³ 0.02 1,324,240.21 23,836.32 2,383.63 26,219.96
b Pembesian Riingbalk Kg 4.65 21,672.59 100,742.85 10,074.29 110,817.14
c Bekisting (2x pakai) M² 0.28 138,506.50 38,781.82 3,878.18 42,660.00
4 Kolom 20 x 20 cm
a Beton fc 21,7 Mpa M³ 0.08 1,324,240.21 107,263.46 10,726.35 117,989.80
IV PEKERJAAN PASANGAN
1 Pasangan dinding bata merah , 1Pc : 5Psr M² 2.19 166,975.36 365,676.04 36,567.60 402,243.64
2 Plesteran Dinding dan beton, 1Pc : 5Psr M² 1.32 49,100.86 64,813.14 6,481.31 71,294.45
JUMLAH IV 719,168.68
JUMLAH V 150,406.33
HARGA JUMLAH
PPN TOTAL HARGA
NO URAIAN PEKERJAAN SAT VOL SATUAN HARGA
10% (Rp)
(Rp) (Rp)
VI PEKERJAAN PENGECATAN
1 Pengecatan tembok Eksterior M² 2.83 42,305.56 119,724.73 11,972.47 131,697.21
JUMLAH VI 131,697.21
3 Pemasangan Pipa PVC Dia. 1/2" (Dari Tempat Penampunga M 10.00 43,133.75 431,337.50 43,133.75 474,471.25