VOLUME HARGA SATUAN TOTAL HARGA VOLUME TOTAL HARGA VOLUME TOTAL HARGA VOLUME HARGA SATUAN TOTAL HARGA
1 Mobilisasi Peralatan dan Tenaga Kerja Ls 1.000 Rp 5,000,000.00 Rp 5,000,000.00 - - - - 1.00 5,000,000.00 5,000,000.00
2 Pasang Bouwplank & Pengukuran M¹ 31.000 Rp 73,815.00 Rp 2,288,265.00 - - - - 31.00 73,815.00 2,288,265.00
3 Pembuatan Gudang Semen dan Peralatan M² 9.000 Rp 1,305,832.00 Rp 11,752,488.00 - - - - 9.00 1,305,832.00 11,752,488.00
0 0 0 0.000 Rp - Rp - - - - - - - -
1 Pek. Pembongkaran Lantai Dermaga (Papan) M² 172.500 Rp 50,000.00 Rp 8,625,000.00 - - - - 172.50 50,000.00 8,625,000.00
2 Pek. Pemasangan Baut Dynabolt 16 Bh 300.000 Rp 40,000.00 Rp 12,000,000.00 35.00 1,400,000.00 (35.00) (1,400,000.00) 335.00 40,000.00 13,400,000.00
3 Pek. Pemasangan Angkur Besi D13 Kg Rp 20,302.80 Rp - 106.08 2,153,788.70 (106.08) (2,153,788.70) 106.08 20,302.80 2,153,788.70
0 - Cor Beton K.350 M³ 34.500 Rp 2,220,540.00 Rp 76,608,630.00 14.29 31,729,296.06 (14.29) (31,729,296.06) 48.79 2,220,540.00 108,337,926.06
0 - Besi Beton Ulir D16 Kg Rp 20,302.80 663.58 13,472,430.51 (663.58) (13,472,430.51) 663.58 20,302.80 13,472,430.51
0 - Besi Beton Ulir D13 Kg 7225.400 Rp 20,302.80 Rp 146,695,851.12 (4,048.63) (82,198,508.24) 4,048.63 82,198,508.24 3,176.77 20,302.80 64,497,342.87
PEKERJAAN TAMBAH KURANG
KONTRAK AWAL KONTRAK ADDENDUM
NO URAIAN PEKERJAAN SAT PEKERJAAN TAMBAH PEKERJAAN KURANG
VOLUME HARGA SATUAN TOTAL HARGA VOLUME TOTAL HARGA VOLUME TOTAL HARGA VOLUME HARGA SATUAN TOTAL HARGA
0 - Cor Beton K.350 M³ 11.620 Rp 2,220,540.00 Rp 25,802,674.80 (5.68) (12,601,564.50) 5.68 12,601,564.50 5.95 2,220,540.00 13,201,110.30
0 - Besi Beton Ulir D16 Kg 763.667 Rp 20,302.80 Rp 15,504,571.60 (598.56) (12,152,376.29) 598.56 12,152,376.29 165.11 20,302.80 3,352,195.31
0 - Besi Beton Ulir D13 Kg 352.907 Rp 20,302.80 Rp 7,164,993.47 412.20 8,368,763.40 (412.20) (8,368,763.40) 765.10 20,302.80 15,533,756.87
0 - Bekisting Balok M² 62.500 Rp 466,032.00 Rp 29,127,000.00 4.27 1,989,956.64 (4.27) (1,989,956.64) 66.77 466,032.00 31,116,956.64
0 - Cor Beton K.350 M³ 1.830 Rp 2,220,540.00 Rp 4,063,588.20 (0.74) (1,645,420.14) 0.74 1,645,420.14 1.09 2,220,540.00 2,418,168.06
0 - Besi Beton Ulir D13 Kg 199.784 Rp 20,302.80 Rp 4,056,174.60 (108.12) (2,195,084.60) 108.12 2,195,084.60 91.67 20,302.80 1,861,090.00
0 - Bekisting Tangga M² 10.200 Rp 438,732.00 Rp 4,475,066.40 (2.40) (1,052,956.80) 2.40 1,052,956.80 7.80 438,732.00 3,422,109.60
0 - Cor Beton K.350 M³ 2.500 Rp 2,220,540.00 Rp 5,551,350.00 0.90 1,989,603.84 (0.90) (1,989,603.84) 3.40 2,220,540.00 7,540,953.84
0 - Besi Beton Ulir D16 Kg 158.000 Rp 20,302.80 Rp 3,207,842.40 47.20 958,292.16 (47.20) (958,292.16) 205.20 20,302.80 4,166,134.56
0 - Besi Beton Ulir D13 Kg 164.667 Rp 20,302.80 Rp 3,343,194.40 29.58 600,624.50 (29.58) (600,624.50) 194.25 20,302.80 3,943,818.90
0 - Bekisting Balok M² 17.500 Rp 466,032.00 Rp 8,155,560.00 25.70 11,977,022.40 (25.70) (11,977,022.40) 43.20 466,032.00 20,132,582.40
8 Pemadatan Beton dengan Vibrator M³ 50.450 Rp 16,800.00 Rp 847,560.00 8.77 147,319.20 (8.77) (147,319.20) 59.22 16,800.00 994,879.20
10 Kansteen Beton (20x30 cm) M³ 2.400 Rp 1,535,247.00 Rp 3,684,592.80 0.30 452,897.87 (0.30) (452,897.87) 2.70 1,535,247.00 4,137,490.67
0 0 0 0.000 Rp - Rp - - - - - - - -
1 Pengacian Lantai Dermaga Tekstural M² 172.500 Rp 53,182.00 Rp 9,173,895.00 3.32 176,830.15 (3.32) (176,830.15) 175.83 53,182.00 9,350,725.15
2 Pengecatan Bollard M² 3.840 Rp 54,138.00 Rp 207,889.92 0.15 8,061.92 (0.15) (8,061.92) 3.99 54,138.00 215,951.84
0 0 0 0.000 Rp - Rp - - - - - - - -
1 Fender Karet + Instalasi (Type M) Bh 11.000 Rp 7,500,000.00 Rp 82,500,000.00 - - - - 11.00 7,500,000.00 82,500,000.00
3 Pemasangan Cincin Dermaga Bh Rp 1,500,000.00 4.00 6,000,000.00 (4.00) (6,000,000.00) 4.00 1,500,000.00 6,000,000.00
0 0 0 0.000 Rp - Rp - - - - - - - -
0 - Cor Beton K.250 M³ 27.500 Rp 1,752,381.00 Rp 48,190,477.50 41.25 72,285,716.25 (41.25) (72,285,716.25) 68.75 1,752,381.00 120,476,193.75
0 - Besi Beton Ulir D13 Kg 2897.440 Rp 20,302.80 Rp 58,826,144.83 54.64 1,109,412.67 (54.64) (1,109,412.67) 2,952.08 20,302.80 59,935,557.50
2 Perkuatan Talud M³ 30.000 Rp 1,316,263.00 Rp 39,487,890.00 (25.35) (33,363,318.26) 25.35 33,363,318.26 4.65 1,316,263.00 6,124,571.74
VOLUME HARGA SATUAN TOTAL HARGA VOLUME TOTAL HARGA VOLUME TOTAL HARGA VOLUME HARGA SATUAN TOTAL HARGA
b Pemasangan Batu Tela 1: 4 M² 25.600 Rp 252,987.00 Rp 6,476,467.20 (4.37) (1,106,059.16) 4.37 1,106,059.16 21.23 252,987.00 5,370,408.04
c Plesteran Dinding 1 : 4 M² 12.800 Rp 90,984.00 Rp 1,164,595.20 19.04 1,732,517.33 (19.04) (1,732,517.33) 31.84 90,984.00 2,897,112.53
d Pengecoran Lantai Drainase M³ 0.480 Rp 1,535,247.00 Rp 736,918.56 0.32 485,214.81 (0.32) (485,214.81) 0.80 1,535,247.00 1,222,133.37
e Besi Grill M¹ 8.000 Rp 400,000.00 Rp 3,200,000.00 1.30 520,000.00 (1.30) (520,000.00) 9.30 400,000.00 3,720,000.00
0 0 0 0.000 Rp - Rp - - - - - - - -
Jayapura, --
BADAN NASIONAL PENCARIAN DAN PERTOLONGAN CV. PRIMATAMA CONSULTANT CV. DELTA KARYA
KELAS A JAYAPURA