USULAN PEKERJAAN TAMBAH KURANG ( CCO )

PEKERJAAN : PERBAIKAN SARANA DAN PRASARANA PENDUKUNG PESPARAWI


PAKET1. PERBAIKAN SHINING STRA SCHOOL SP.2 DAN SHINING STAR SCHOOL SERUI MEKAR TIMIKA )
LOKASI : TIMIKA
TAHUN ANGGARAN : 2021

JUMLAH HARGA PEKERJAAN TAMBAH KURANG CCO


HARGA SATUAN PEKERJAAN TAMBAH PEKERJAAN KURANG
NO URAIAN PEKERJAAN SAT JUMLAH HARGA JUMLAH HARGA KETERANGAN
(Rp.) KUANTITAS JUMLAH HARGA JUMLAH HARGA KUANTITAS BOBOT (%)
(Rp) KUANTITAS KUANTITAS (Rp)
(Rp) (Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5) (7) (8) = (4) x (7) (9) (10) = (4) x (9) ( 11 ) (12) = (4) x (11) ( 13 ) ( 14 )

1 SHINING STAR SP.2 TIMIKA


A. PEMBANGUNAN TOILET UMUM

I PEKERJAAN PERSIAPAN
1 Pengukuran & Pemasangan Bouwplank M' 54,412.25 16.00 870,596.00 - - - - 16.00 870,596.00 0.22 Tetap
2 Mobilisasi dan Demobilisasi Ls 1,000,000.00 1.00 1,000,000.00 - - - - 1.00 1,000,000.00 0.26 Tetap
3 Listrik dan Air Kerja Ls 1,200,000.00 1.00 1,200,000.00 - - - - 1.00 1,200,000.00 0.31 Tetap
4 RK3K Ls 2,761,000.00 1.00 2,761,000.00 - - - - 1.00 2,761,000.00 0.71 Tetap
5 Manajemen dan Keslamatan Lalu Lintas Ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00 0.13 Tetap

II PEKERJAAN TANAH DAN PASIR


1 Galian Tanah Biasa M³ 126,643.75 9.50 1,203,115.63 - - 9.50 1,203,115.63 - - - Dihilangkan
2 Urugan sirtu M³ 330,768.75 30.46 10,075,216.13 - - 30.46 10,075,216.13 - - - Dihilangkan

III PEKERJAAN PONDASI


1 Pondasi batu kosong M³ 892,532.25 4.75 4,239,528.19 - - 4.75 4,239,528.19 - - - Dihilangkan
2 Pondasi batu kali M³ 1,566,731.25 21.24 33,277,371.75 - - 21.24 33,277,371.75 - - - Dihilangkan
3 Sloof beton 15 x 20 cm M³ 6,162,812.10 0.89 5,484,902.77 - - 0.89 5,484,902.77 - - - Dihilangkan
4 Pasangan rolag ½ bata tela 1 : 5 M² 261,106.64 11.34 2,960,949.30 - - 11.34 2,960,949.30 - - - Dihilangkan
5 Beton rabat, tebal 8 cm M³ 1,572,912.50 1.89 2,972,804.63 - - 1.89 2,972,804.63 - - - Dihilangkan
6 Pondasi Tapak Menara Air (batu kali) M³ 1,566,731.25 1.80 2,820,116.25 - - 1.80 2,820,116.25 - - - Dihilangkan

IV PEKERJAAN PASANGAN
1 Pasangan dinding ½ bata ad. 1:5 M² 148,121.73 74.68 11,061,730.80 88.57 13,119,215.69 - - 163.25 24,180,946.48 6.23 Bertambah
2 Plester + acian 1 : 5 M² 147,595.60 89.36 13,189,142.82 - - 89.36 13,189,142.82 - - - Dihilangkan
3 Kolom praktis KP ad. 1:2:3, ukuran 10 x 10 cm M³ 7,729,970.67 0.25 1,932,492.67 0.08 649,317.54 - - 0.33 2,581,810.20 0.66 Bertambah
4 Ring balok praktis RB ad. 1:2:3, uk. 10 x 20 cm M³ 7,191,637.84 0.45 3,236,237.03 - - 0.13 927,721.28 0.32 2,308,515.75 0.59 Berkurang

V PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pintu toilet Baru dan Rehab Unit
a. Kusen pintu kayu besi 6x12 M3 12,065,225.00 0.17 2,051,088.25 - - 0.17 2,051,088.25 - - - Dihilangkan
b. Daun pintu panel kayu besi Bh 1,213,803.15 5.00 6,069,015.75 - - 5.00 6,069,015.75 - - - Dihilangkan
c. Engsel 4" Bh 78,721.81 15.00 1,180,827.15 - - 15.00 1,180,827.15 - - - Dihilangkan
d. Kunci oval ss. steel Set 317,060.75 5.00 1,585,303.75 - - 5.00 1,585,303.75 - - - Dihilangkan
0.90
VI PEKERJAAN LANGIT-LANGIT
1 Plafond multiplek 4 mm rangka kaso 5 x 5 cm M² 163,873.00 41.52 6,804,006.96 - - 41.52 6,804,006.96 - - - Dihilangkan
2 List plafond profil kayu M' 41,325.25 66.10 2,731,599.03 - - 66.10 2,731,599.03 - - - Dihilangkan
3 Plafond Gipsum 0.9 mm Rangka Hollow 4/4 & 2/4 cm Lt. 2. M² 241,568.63 - - 58.98 14,247,717.95 58.98 14,247,717.95 3.67 Item Baru

DKH TOILET BARU Hal. : 1 dari 31


JUMLAH HARGA PEKERJAAN TAMBAH KURANG CCO
HARGA SATUAN PEKERJAAN TAMBAH PEKERJAAN KURANG
NO URAIAN PEKERJAAN SAT JUMLAH HARGA JUMLAH HARGA KETERANGAN
(Rp.) KUANTITAS JUMLAH HARGA JUMLAH HARGA KUANTITAS BOBOT (%)
(Rp) KUANTITAS KUANTITAS (Rp)
(Rp) (Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5) (7) (8) = (4) x (7) (9) (10) = (4) x (9) ( 11 ) (12) = (4) x (11) ( 13 ) ( 14 )

VII PEKERJAAN LANTAI


1 Keramik Lantai toilet 25 x 25 cm, unpolish ex. platinum setara M² 265,544.78 28.88 7,668,933.25 - - 28.88 7,668,933.25 - - - Dihilangkan
2 Keramik Dinding toilet 25 x 40 cm, polish ex. platinum setara M² 273,718.11 63.44 17,364,676.90 - - 63.44 17,364,676.90 - - - Dihilangkan
3 Kuku macan Uk. 10 cm M' 35,457.00 3.50 124,099.50 6.70 237,561.90 3.50 124,099.50 10.20 361,661.40 0.09 Bertambah
4 Granit Lantai toilet 60 x 60 cm, polish ex. Platinum setara M² 405,456.65 - - 43.58 17,669,800.81 - - 58.98 23,913,833.22 6.16 Item Baru
6 Granit Dinding toilet 60 x 60 cm, polish ex. Platinum setara M² 405,456.65 - - 101.51 41,157,499.08 - - 101.51 41,157,499.08 10.60 Item Baru
7 Keramik Dinding toilet 30 x 60 cm, popish ex. Roman setara M² 385,480.51 - - 100.04 38,561,928.41 - - 100.04 38,561,928.41 9.93 Item Baru

VIII PEKERJAAN SANITARY


1 Kloset Duduk + Accessories lengkap Set 2,856,577.00 2.00 5,713,154.00 5.00 2,856,582.00 7.00 19,996,039.00 5.15 Bertambah
2 Kloset Jongkok Bh 593,917.50 3.00 1,781,752.50 - - 3.00 1,781,752.50 - - - Dihilangkan
3 Jet Sprey TOTO Bh 438,408.75 2.00 876,817.50 4.00 438,412.75 - - 6.00 2,630,452.50 0.68 Bertambah
4 Kran tembok Bh 139,840.00 7.00 978,880.00 - - - - 7.00 978,880.00 0.25 Tetap
5 Floor drain Bh 162,408.75 5.00 812,043.75 - - 5.00 4,060,218.75 - - - Dihilangkan
6 Westafel + Accessories lengkap Set 1,674,400.00 2.00 3,348,800.00 - - - - 2.00 3,348,800.00 0.86 Tetap
7 Cermin Westafel Bh 414,521.81 2.00 829,043.62 - - - - 2.00 829,043.62 0.21 Tetap
8 Gantungan Jemuran Aluminimum 175x200 cm Bh 775,000.00 10.00 7,750,000.00 - - - - 10.00 7,750,000.00 2.00 Tetap
9 Urinuir Ex. TOTO U.57 MW/F + Flash T.60 P Set 4,433,250.00 - - 3.00 4,433,253.00 - - 3.00 13,299,750.00 3.42 Item Baru
10 Shower tangan + Kran Stop, Ex. TOTO TX 402 SP Set 1,003,025.00 - - 1.00 1,003,026.00 - - 1.00 1,003,025.00 0.26 Item Baru

IX PEKERJAAN PENGECATAN
1 Cat tembok dalam ex vinilex setara M² 40,461.60 37.35 1,511,240.76 - - 37.35 1,511,240.76 - - - Dihilangkan
2 Cat tembok luar ex. Viniolex setara M² 44,486.60 115.75 5,149,323.95 - - 115.75 5,149,323.95 - - - Dihilangkan
3 Cat plafond, ex vinilex setara M² 40,461.60 41.52 1,679,965.63 17.46 706,459.54 - - 58.98 2,386,425.17 0.61 Bertambah
4 Cat list profil kayu M' 6,372.92 66.10 421,250.01 - - 66.10 421,250.01 - - - Dihilangkan
5 Cat kusen/daun pintu dan jendela M² 63,729.17 26.19 1,669,066.96 - - 26.19 1,669,066.96 - - - Dihilangkan

X PEKERJAAN ATAP
1 Kuda kuda kayu kelas I, 5 x 10 cm M³ 10,872,790.00 0.19 2,065,830.10 - - 0.19 2,065,830.10 - - - Dihilangkan
2 Gording kuda kayu kelas I, 5 x 10 cm M³ 9,887,125.00 0.42 4,152,592.50 - - 0.42 4,152,592.50 - - - Dihilangkan
3 Atap Seng Gelombang BJLS 20 M² 112,290.84 54.06 6,070,442.81 - - 54.06 6,070,442.81 - - - Dihilangkan
4 Seng Bubungan BJLS 20 M² 105,708.00 9.60 1,014,796.80 - - 9.60 1,014,796.80 - - - Dihilangkan
5 Lisplank kayu kelas II, 2,5 x 25 cm M' 110,741.41 30.92 3,424,124.40 - - 30.92 3,424,124.40 - - - Dihilangkan
6 Cat lisplank M² 63,729.17 8.50 541,697.95 - - 8.50 541,697.95 - - - Dihilangkan

XI PEKERJAAN MEKANIKAL ELEKTRIKAL

XI.a. PEKERJAAN ELEKTRIKAL


1 Pekerjaan Instalasi dan Fixtures
Instalasi penerangan dan titik daya menggunakan kabel
NYM 3x1.5 mm², uPVC, Konduit, dan aksesoris
a. Instalasi penerangan luar Ls 307,050.00 2.00 614,100.00 - - - - 2.00 614,100.00 0.16 Tetap
b. Instalasi penerangan dalam Ls 307,050.00 5.00 1,535,250.00 8.00 2,456,400.00 - - 13.00 3,991,650.00 1.03 Bertambah
2 Fixtures & Armatures
Lengkap ballast Low Loss, kapasitor, starter, holder, wring
dan aksesoris.
a. LED 9W Lengkap Fitting Set 149,212.50 7.00 1,044,487.50 6.00 895,275.00 - - 13.00 1,939,762.50 0.50 Bertambah
b. Saklar Single Bh 85,962.50 7.00 601,737.50 - - 5.00 429,812.50 2.00 171,925.00 0.04 Berkurang
c. Saklar Double Bh 88,837.50 - - 2.00 177,675.00 - - 2.00 177,675.00 0.05 Item Baru
3 Wall Van + Intalasi Bh 900,000.00 - - 2.00 1,800,000.00 - - 2.00 1,800,000.00 0.46 Item Baru

DKH TOILET BARU Hal. : 2 dari 31


JUMLAH HARGA PEKERJAAN TAMBAH KURANG CCO
HARGA SATUAN PEKERJAAN TAMBAH PEKERJAAN KURANG
NO URAIAN PEKERJAAN SAT JUMLAH HARGA JUMLAH HARGA KETERANGAN
(Rp.) KUANTITAS JUMLAH HARGA JUMLAH HARGA KUANTITAS BOBOT (%)
(Rp) KUANTITAS KUANTITAS (Rp)
(Rp) (Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5) (7) (8) = (4) x (7) (9) (10) = (4) x (9) ( 11 ) (12) = (4) x (11) ( 13 ) ( 14 )

XI.b. PEKERJAAN MEKANIKAL


1 Instalasi air bersih
Bahan : pipa PVC Wavin AW
a. Diameter ¾" M' 34,717.35 29.50 1,024,161.83 0.50 17,358.68 - - 30.00 1,041,520.50 0.27 Bertambah
b. Diameter1" M' 39,892.35 9.00 359,031.15 11.00 438,815.85 - - 20.00 797,847.00 0.21 Bertambah
c. Diameter1¼" M' 48,517.35 10.00 485,173.50 38.00 1,843,659.30 - - 48.00 2,328,832.80 0.60 Bertambah
d. Diameter 2" M' 70,188.53 15.00 1,052,827.95 5.00 350,942.65 - - 20.00 1,403,770.60 0.36 Bertambah
e. Diameter 3" M' 125,994.58 4.50 566,975.61 - - 1.50 188,991.87 3.00 377,983.74 0.10 Berkurang
f. Fitting dan accessories Ls 523,225.49 1.00 523,225.49 - - - - 1.00 523,225.49 0.13 Tetap
2 Instalasi air kotor
Bahan : pipa PVC Wavin AW
a. Diameter 3" M' 125,994.58 18.00 2,267,902.44 10.00 1,259,945.80 - - 28.00 3,527,848.24 0.91 Bertambah
b. Diameter 4" M' 177,744.58 18.00 3,199,402.44 10.00 1,777,445.80 - - 28.00 4,976,848.24 1.28 Bertambah
c. Fitting dan accessories Ls 820,095.71 1.00 820,095.71 - - - - 1.00 820,095.71 0.21 Tetap
3 Perbaikan Saluran Air Kotor Urinuir Lantai 1 Ls 500,000.00 - - 1.00 500,000.00 - - 1.00 500,000.00 0.13 Bertambah
4 JET PUMP Unit 25,000,000.00 1.00 25,000,000.00 - - - - 1.00 25,000,000.00 6.44 Tetap
Lokasi : Site Plan
Type : Submersible pump
Kapasitas : 20-26 Liter/menit (minimum)
Total head : 56-30 Mtr
Daya : 500 Watt
Material pump
Pekerjaan termasuk :
- Panel Control lengkap dengan pengkabelan
- Water Level Control pada roof tank, termasuk pengkabelan
- Pengeboran dengan kedalaman ±30 m
- Casing, pipa hisap, pipa distribusi, Valve, check valve, bak kontrol,
rumah pompa+pengaman, fitting dan accessories lainnya
- Perijinan
- Kelengkapan lain sesuai dengan spesifikasi teknis.
5 Septictank (1 unit)
a. Galian Tanah M³ 126,643.75 4.72 597,758.50 - - 4.72 597,758.50 - - Dihilangkan
b. Beton rabat tebal 15 cm M³ 1,572,912.50 0.42 660,623.25 - - 0.42 660,623.25 - - Dihilangkan
c. Kolom Beton 1 : 2 : 3 (18 x 18) cm M³ 7,729,970.67 0.16 1,236,795.31 - - 0.16 1,236,795.31 - - Dihilangkan
d. Plat lantai 1 : 2 : 3, tebal 12 cm M³ 7,477,284.59 0.32 2,392,731.07 - - 0.32 2,392,731.07 - - Dihilangkan
e. Pasangan 1 bata ad. 1 :3 M² 261,106.64 6.84 1,785,969.42 - - 6.84 1,785,969.42 - - Dihilangkan
f. Pasangan ½ bata ad. 1 :3 M² 148,121.73 1.50 222,182.60 - - 1.50 222,182.60 - - Dihilangkan
g. Plesteran ad. 1 : 3 M² 85,553.10 8.84 756,289.40 - - 8.84 756,289.40 - - Dihilangkan
h. Ring balok beton 1 : 2 : 3 (10 x 15) cm M³ 7,191,637.84 0.03 215,749.14 - - 0.03 215,749.14 - - Dihilangkan
i. Venting pipa PVC 1" Bh 39,892.35 2.00 79,784.70 - - 2.00 79,784.70 - - Dihilangkan
6 Resapan (1 unit)
a. Galian Tanah M³ 126,643.75 1.37 173,501.94 - - 1.37 173,501.94 - - Dihilangkan
b. Buis beton Ø80 mm M' 375,000.00 1.50 562,500.00 - - 1.50 562,500.00 - - Dihilangkan
c. Tutup buis beton Bh 120,000.00 1.00 120,000.00 - - 1.00 120,000.00 - - Dihilangkan
d. Pasir urug M³ 330,768.75 0.13 42,999.94 - - 0.13 42,999.94 - - Dihilangkan
e. Ijuk M³ 2,000,000.00 0.13 260,000.00 - - 0.13 260,000.00 - - Dihilangkan
f. Koral M³ 600,000.00 0.13 78,000.00 - - 0.13 78,000.00 - - Dihilangkan
g. Pipa PVC AW Ø4" M' 177,744.58 2.00 355,489.16 - - 2.00 355,489.16 - - Dihilangkan
7 Tandon Air Kapasita 1.100 Litr Bh 2,209,408.75 3.00 6,628,226.25 - - 1.00 2,209,408.75 2.00 4,418,817.50 1.14 Berkurang

DKH TOILET BARU Hal. : 3 dari 31


JUMLAH HARGA PEKERJAAN TAMBAH KURANG CCO
HARGA SATUAN PEKERJAAN TAMBAH PEKERJAAN KURANG
NO URAIAN PEKERJAAN SAT JUMLAH HARGA JUMLAH HARGA KETERANGAN
(Rp.) KUANTITAS JUMLAH HARGA JUMLAH HARGA KUANTITAS BOBOT (%)
(Rp) KUANTITAS KUANTITAS (Rp)
(Rp) (Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5) (7) (8) = (4) x (7) (9) (10) = (4) x (9) ( 11 ) (12) = (4) x (11) ( 13 ) ( 14 )
8 Menara Air (Besi) Bh 4,336,908.75 3.00 13,010,726.25 - - 3.00 13,010,726.25 2.00 8,673,817.50 2.23 Berkurang
- Tinggi : 3 Meter
- Bahan : - Besi UNP 65.42.5 dan besi L 40.40.3
- Lengkap deng: Tangga monyet

2 SHINING STAR SERUI MEKAR TIMIKA


A REHAB BANGUNAN GEDUNG SEKOLAH

I PEKERJAAN PERSIAPAN
1 Pengukuran & Pemasangan Bouwplank M' 54,412.25 10.00 544,122.50 - - - - 10.00 544,122.50 0.14 Tetap
2 Mobilisasi dan Demobilisasi Ls 1,000,000.00 1.00 1,000,000.00 - - - - 1.00 1,000,000.00 0.26 Tetap
3 Listrik dan Air Kerja Ls 1,200,000.00 1.00 1,200,000.00 - - - - 1.00 1,200,000.00 0.31 Tetap
4 RK3K Ls 2,761,000.00 1.00 2,761,000.00 - - - - 1.00 2,761,000.00 0.71 Tetap
5 Manajemen dan Keslamatan lalu Lintas Ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00 0.13 Tetap

II PEKERJAAN TANAH DAN PASIR


1 Galian Tanah Biasa M³ 126,643.75 1.10 139,308.13 - - - - 1.10 139,308.13 0.04 Tetap

III PEKERJAAN PONDASI


1 Pondasi batu kosong M³ 892,532.25 0.58 517,668.71 - - - - 0.58 517,668.71 0.13 Tetap
2 Pondasi batu kali M³ 1,566,731.25 2.85 4,465,184.06 - - - - 2.85 4,465,184.06 1.15 Tetap
3 Sloof beton 15 x 20 cm M³ 6,162,812.10 0.11 677,909.33 - - - - 0.11 677,909.33 0.17 Tetap
4 Beton rabat, tebal 8 cm M³ 1,572,912.50 0.48 754,998.00 - - - - 0.48 754,998.00 0.19 Tetap
5 Pondasi Menara Air M³ 1,566,731.25 8.06 12,627,853.88 - - - - 8.06 12,627,853.88 3.25 Tetap

IV PEKERJAAN PASANGAN
1 Pasangan dinding ½ bata ad. 1:5 M² 148,121.73 21.72 3,217,203.98 - - - - 21.72 3,217,203.98 0.83 Tetap
2 Plester+ acian 1 : 5 M² 147,595.60 19.29 2,847,119.12 - - - - 19.29 2,847,119.12 0.73 Tetap
3 Glas Blok Uk. 20 x 20 cm M² 624,000.00 0.24 149,760.00 - - 0.16 99,840.00 0.08 49,920.00 0.01 Berkurang
4 Kolom praktis KP ad. 1:2:3, ukuran 10 x 10 cm M³ 7,729,970.67 0.13 1,004,896.19 - - - - 0.13 1,004,896.19 0.26 Tetap
5 Ring balok praktis RB ad. 1:2:3, uk. 10 x 20 cm M³ 7,191,637.84 0.11 791,080.16 - - - - 0.11 791,080.16 0.20 Tetap

V PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pintu toilet Baru dan Rehab Unit
a. Kusen pintu kayu besi 6x12 M3 12,065,225.00 0.08 965,218.00 - - - - 0.08 965,218.00 0.25 Tetap
b. Daun pintu panel kayu besi Bh 1,213,803.15 3.00 3,641,409.45 - - - - 3.00 3,641,409.45 0.94 Tetap
c. Engsel 4" Bh 78,721.81 9.00 708,496.29 - - - - 9.00 708,496.29 0.18 Tetap
d. Kunci oval ss. steel Set 317,060.75 3.00 951,182.25 - - - - 3.00 951,182.25 0.24 Tetap

VI PEKERJAAN LANGIT-LANGIT
1 Plafond multiplek 4 mm rangka kaso 5 x 5 cm M² 163,873.00 6.29 1,030,761.17 - - 3.44 563,723.12 2.85 467,038.05 0.12 Berkurang
2 List plafond profil kayu M' 41,325.25 21.76 899,237.44 - - 7.56 312,418.89 14.20 586,818.55 0.15 Berkurang

VII PEKERJAAN LANTAI


1 Bongkar keramik lantai toilet lama & lokasi toilet baru M² 32,406.54 16.99 550,587.11 - - - - 16.99 550,587.11 0.14 Tetap
2 Keramik lantai toilet 25 x 25 cm, unpolish platinum setara M² 265,544.78 12.24 3,250,268.11 - - - - 12.24 3,250,268.11 0.84 Tetap
3 Keramik dinding 25 x 40 cm, polish paltinum setara M² 273,718.11 30.09 8,236,177.93 - - - - 30.09 8,236,177.93 2.12 Tetap
4 Ganti keramik/granit lantai Uk 60 x 60 ex Granit/platinum M² 405,456.65 3.64 1,475,862.21 4.10 405,456.65 - - 7.74 3,139,856.30 0.81 Bertambah
5 Kuku macan Uk. 10 cm M' 35,457.00 2.40 85,096.80 - - - - 2.40 85,096.80 0.02 Tetap

DKH TOILET BARU Hal. : 4 dari 31


JUMLAH HARGA PEKERJAAN TAMBAH KURANG CCO
HARGA SATUAN PEKERJAAN TAMBAH PEKERJAAN KURANG
NO URAIAN PEKERJAAN SAT JUMLAH HARGA JUMLAH HARGA KETERANGAN
(Rp.) KUANTITAS JUMLAH HARGA JUMLAH HARGA KUANTITAS BOBOT (%)
(Rp) KUANTITAS KUANTITAS (Rp)
(Rp) (Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5) (7) (8) = (4) x (7) (9) (10) = (4) x (9) ( 11 ) (12) = (4) x (11) ( 13 ) ( 14 )
VIII PEKERJAAN SANITARY
1 Kloset Duduk + Accessories lengkap Set 2,856,577.00 3.00 8,569,731.00 - - - - 3.00 8,569,731.00 2.21 Tetap
3 Kran tembok Bh 139,840.00 4.00 559,360.00 - - - - 4.00 559,360.00 0.14 Tetap
4 Floor drain Bh 162,408.75 4.00 649,635.00 - - - - 4.00 649,635.00 0.17 Tetap
5 Westafel + Accessories lengkap Set 1,674,400.00 1.00 1,674,400.00 - - - - 1.00 1,674,400.00 0.43 Tetap
6 Urinoir ex. TOTO U 57 M + accessories lengkap Set 4,433,250.00 1.00 4,433,250.00 - - - - 1.00 4,433,250.00 1.14 Tetap
7 Cermin Westafel Bh 414,521.81 1.00 414,521.81 - - - - 1.00 414,521.81 0.11 Tetap
8 Gantungan Jemuran Aluminimum 175x200 cm Bh 775,000.00 8.00 6,200,000.00 - - - - 8.00 6,200,000.00 1.60 Tetap
9 Jet Sprey TOTO Bh 428,950.00 - - 3.00 1,286,850.00 - - 3.00 1,286,850.00 0.33 Item Baru

IX PEKERJAAN PENGECATAN
1 Cat tembok dalam, ex vinilex setara M² 40,461.60 33.26 1,345,752.82 - - - - 33.26 1,345,752.82 0.35 Tetap
2 Cat tembok luar, ex vinilex setara M² 44,486.60 29.20 1,299,008.72 - - - - 29.20 1,299,008.72 0.33 Tetap
3 Cat plafond, ex vinilex setara M² 40,461.60 6.29 254,503.46 5.95 240,746.52 - - 12.24 495,249.98 0.13 Bertambah
4 Cat list profil kayu M' 6,372.92 21.90 139,566.95 - - - - 21.90 139,566.95 0.04 Tetap
5 Cat kusen/daun pintu dan jendela M² 63,729.17 21.15 1,347,871.95 - - - - 21.15 1,347,871.95 0.35 Tetap

X PEKERJAAN MEKANIKAL ELEKTRIKAL

X.a. PEKERJAAN ELEKTRIKAL


1 Pekerjaan Instalasi dan Fixtures
Instalasi penerangan dan titik daya menggunakan kabel
NYM 3x1.5 mm², uPVC, Konduit, dan aksesoris
a. Instalasi penerangan dalam Ls 307,050.00 3.00 921,150.00 - - 2.00 614,100.00 1.00 307,050.00 0.08 Berkurang
2 Fixtures & Armatures
Lengkap ballast Low Loss, kapasitor, starter, holder, wring
dan aksesoris.
a. Recessed Mounted Down Light LED . 9W Set 273,987.50 3.00 821,962.50 - - 2.00 547,975.00 1.00 273,987.50 0.07 Berkurang
b. Saklar Single Bh 85,962.50 3.00 257,887.50 - - 2.00 171,925.00 1.00 85,962.50 0.02 Berkurang
3 Wall Van + Intalasi Bh 900,000.00 3.00 2,700,000.00 - - - - 3.00 2,700,000.00 0.70 Tetap

X.b. PEKERJAAN MEKANIKAL


1 Instalasi air bersih
Bahan : pipa PVC Wavin AW
a. Diameter ¾" M' 34,717.35 30.00 1,041,520.50 - - - - 30.00 1,041,520.50 0.27 Tetap
b. Diameter1" M' 39,892.35 12.00 478,708.20 - - - - 12.00 478,708.20 0.12 Tetap
c. Diameter1¼" M' 48,517.35 12.00 582,208.20 - - - - 12.00 582,208.20 0.15 Tetap
d. Diameter 2" M' 70,188.53 15.00 1,052,827.95 - - - - 15.00 1,052,827.95 0.27 Tetap
e. Diameter 3" M' 125,994.58 5.00 629,972.90 - - - - 5.00 629,972.90 0.16 Tetap
f. Fitting dan accessories Ls 611,573.66 1.00 611,573.66 - - - - 1.00 611,573.66 0.16 Tetap
2 Instalasi air kotor
Bahan : pipa PVC Wavin AW
a. Diameter 3" M' 125,994.58 15.00 1,889,918.70 - - 4.00 503,978.32 11.00 1,385,940.38 0.36 Berkurang
b. Diameter 4" M' 177,744.58 15.00 2,666,168.70 - - 2.00 355,489.16 13.00 2,310,679.54 0.60 Berkurang
c. Fitting dan accessories Ls 751,754.40 1.00 751,754.40 - - - - 1.00 751,754.40 0.19 Tetap
3 Pompa Air (sumber bor exixting) Set 5,966,385.00 1.00 5,966,385.00 - - - - 1.00 5,966,385.00 1.54 Tetap
- Lokasi : Site (dekat reservoir)
- Type : Jet Pump
- Kapasitas : 20 - 26 Liter/Menit
- Pancaran (H) : 56 - 30 mtr
- Daya : 200 v / 50 Hz / 500 w

DKH TOILET BARU Hal. : 5 dari 31


JUMLAH HARGA PEKERJAAN TAMBAH KURANG CCO
HARGA SATUAN PEKERJAAN TAMBAH PEKERJAAN KURANG
NO URAIAN PEKERJAAN SAT JUMLAH HARGA JUMLAH HARGA KETERANGAN
(Rp.) KUANTITAS JUMLAH HARGA JUMLAH HARGA KUANTITAS BOBOT (%)
(Rp) KUANTITAS KUANTITAS (Rp)
(Rp) (Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5) (7) (8) = (4) x (7) (9) (10) = (4) x (9) ( 11 ) (12) = (4) x (11) ( 13 ) ( 14 )
- Lengkap dengan - Barcket dan pondasi
- Fooating valve
- Instalasi titik daya
- Instalasi water level control
- Testing dan commisioning

DKH TOILET BARU Hal. : 6 dari 31


JUMLAH HARGA PEKERJAAN TAMBAH KURANG CCO
HARGA SATUAN PEKERJAAN TAMBAH PEKERJAAN KURANG
NO URAIAN PEKERJAAN SAT JUMLAH HARGA JUMLAH HARGA KETERANGAN
(Rp.) KUANTITAS JUMLAH HARGA JUMLAH HARGA KUANTITAS BOBOT (%)
(Rp) KUANTITAS KUANTITAS (Rp)
(Rp) (Rp)
(1) (2) (3) (4) (5) (6) = (4) x (5) (7) (8) = (4) x (7) (9) (10) = (4) x (9) ( 11 ) (12) = (4) x (11) ( 13 ) ( 14 )
4 Tandon Air Kapasita 1.100 Litr Bh 2,209,408.75 3.00 6,628,226.25 - - 1.00 2,209,408.75 2.00 4,418,817.50 1.14 Berkurang
5 Menara Air (Besi) Bh 4,336,908.75 3.00 13,010,726.25 - - 1.00 4,336,908.75 2.00 8,673,817.50 2.23 Berkurang
- Tinggi : 3 Meter
- Bahan : Besi UNP 65.42.5 dan besi L 40.40.3
- Lengkap dengan : Tangga monyet

3 PEKERJAAN AKHIR

A LAIN-LAIN
1 Dokumentasi dan laporan Ls 1,500,000.00 1.00 1,500,000.00 - - - - 1.00 1,500,000.00 0.39 Tetap
2 Asbuild Drawing Ls 1,500,000.00 1.00 1,500,000.00 - - - - 1.00 1,500,000.00 0.39 Tetap
3 Pembersihan akhir Ls 1,000,000.00 1.00 1,000,000.00 - - - - 1.00 1,000,000.00 0.26 Tetap

REAL COST 388,320,268.96 148,531,345.91 189,687,837.52 388,320,460.45 100.00


PPN 10 % 38,832,026.90 14,853,134.59 18,968,783.75 38,832,046.05
JUMLAH 427,152,295.85 163,384,480.50 208,656,621.27 427,152,506.50
DIBULATKAN 427,100,000.00 180,981,000.00 200,496,000.00 427,100,000.00
SELISIH - - - -

Dibuat Oleh
Konsultan Pengawas
PT. HONAI KONSULTAN INDONESIA

GITA NATALIA DIKA, ST.


Site Engineer

DKH TOILET BARU Hal. : 7 dari 31


VOLUME ITEM PEKERJAAN STRUKTUR

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN PAGAR KEBUN PERCONTOHAN
LOKASI : JL. POROS SP.II - SP.V, KABUPATEN MIMIKA - PAPUA
TAHUN ANGGARAN : 2014

Dimensi
lebar Tinggi Luas Panjang Jumlah Volume Volume
No. Item Pekerjaan a b
(M') (M') (M²) (M') (M') (BH) M³ (M²)

0 Pembersihan lokasi 2.00 2.00 4.00 16.00

1 Galian tanah 9.50


0.80 0.40 0.32 29.70 1.00 9.50

Timbunan penambahan elevasi 30.46


Toilet 2.05 1.10 2.26 8.20 1.00 18.49
Teras 0.80 1.10 0.88 8.20 1.00 7.22
Tangga 0.40 0.85 0.34 8.20 1.00 2.79
Tangga 0.40 0.60 0.24 8.20 1.00 1.97

Pondasi batu kosong 0.80 0.20 0.16 29.70 1.00 4.75


Pondasi batu kali 0.30 0.80 0.55 1.30 0.72 29.70 1.00 21.24
Sloof Beton 0.15 0.20 0.03 29.70 1.00 0.89

Pondasi rolag 0.90 0.00 12.60 1.00 11.34

Rabat 2.75 0.08 0.22 8.60 1.00 1.89

Rabat 0.30 0.70 0.50 0.90 0.45 0.50 8.00 1.80

2 Pasangan

1 Pasangan
Dinding bata
dinding bata tela tebal ½ bata, ad 1 : 5 163.25
1 2.07 3.15 6.52 1.00 6.52
2 1.42 3.15 4.47 2.00 8.95
3 4.58 3.15 14.43 2.00 28.85
4 1.04 3.15 3.28 2.00 6.55
5 (191.49) 4.77 3.15 15.03 2.00 30.05
6 1.93 3.15 6.08 2.00 12.16
7 1.67 3.15 5.26 2.00 10.52
8 4.25 3.15 13.39 2.00 26.78
9 2.02 2.05 4.14 2.00 8.28
10 1.94 2.05 3.98 2.00 7.95
11 1.95 2.05 4.00 2.00 8.00
12 1.96 2.05 4.02 2.00 8.04
13 2.10 2.05 4.31 2.00 8.61
14 1.90 2.05 3.90 2.00 7.79
Pintu 0.90 1.95 1.76 -9.00 -15.80

3 Plesteran + acian, ad. 1 : 5 82.84


1 Dinding 8.25 3.50 28.88 1.00 28.88
2 Dinding 5.15 3.50 18.03 1.00 18.03
3 Dinding 6.92 3.50 24.22 1.00 24.22
4 Dinding 4.35 3.50 15.23 1.00 15.23
5 Pintu 0.90 1.95 1.76 -2.00 -3.51

3 Tiang kolom praktis 0.10 0.10 0.01 3.20 7.00 0.22


0.10 0.10 0.01 2.20 5.00 0.11
0.33

4 Ring balok praktis RB ad. 1:2:3, uk. 10 x 15 cm 0.10 0.15 0.02 21.40 1.00 0.32

5 Bobok Lantai
Air Tinja 3.14 0.13 0.05 0.15 5.00 0.04
Air Bekas 3.14 0.08 0.02 0.15 7.00 0.02
Air Bersih 3.14 0.04 0.01 0.15 7.00 0.01
0.06 0.33
V PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pintu type P1
a. Kusen pintu kayu besi 6x12 0.05 0.15 0.01 4.80 9.00 0.32
0.32
b. Daun pintu panel kayu besi 0.80 1.90 1.52 9.00 13.68

VI PEKERJAAN LANGIT-LANGIT
1 Plafond triplek 4 mm mm mm rangka kayu klas II 41.52
dalam 1.60 2.05 3.28 5.00 16.40
luar 1.00 9.00 9.00 2.00 18.00
0.80 4.45 3.56 2.00 7.12

2 List plafond 1.60 2.05 7.30 5.00


9.00 1.00 20.00 1.00
0.80 1.00 4.80 2.00

3 Plafon Gipsum Rangka Hollow 76.67


Lantai 2 58.98
Lantai 1 17.69

VII PEKERJAAN LANTAI


2 Keramik lantai toilet 60 x 60 cm 58.98
Toilet laki2 2.45 7.00 17.15 1.00 15.40
Toilet Perempuan 5.98 7.00 41.83 1.00 43.58

3 Keramik dinding
Dinding 60x60 101.51
Toilet Laki2 12.17 3.20 38.94 1.00 38.94
2.26 2.20 4.97 1.00 4.97
6.47 1.00 6.47 1.00 6.47
0.90 1.95 1.76 -3.00 -5.27
Toilet Perempuan 11.68 3.20 37.38 1.00 37.38
7.63 2.20 16.79 1.00 16.79
12.76 1.00 12.76 1.00 12.76
0.90 1.95 1.76 -6.00 -10.53

Dinding 30x60 100.04


Tailet Lelaki 1 6.26 2.20 13.76 1.00 13.76
Tailet Lelaki 2 6.40 2.20 14.08 1.00 14.08
Toilet Perempuan 1 6.99 2.20 15.38 1.00 15.38
Toilet Perempuan 2 7.03 2.20 15.47 1.00 15.47
Toilet Perempuan 3 9.73 2.20 21.41 1.00 21.41
Toilet Perempuan 4 6.97 2.20 15.33 1.00 15.33
Toilet Perempuan 5 7.68 2.20 16.90 1.00 16.90
Pintu Toilet 0.90 1.95 1.76 -7.00 -12.29

Bak Mandi 1.55 0.80 1.24 3.00 7.44


410.53
4 Kuku Macan uk. 10 cm 0.10 35.00

PLINT 13.70
6.40
8.25
VIII PEKERJAAN SANITARY
1 Kloset Dukduk 2.00
2 Kloset Jongkok 3.00
3 Bak air fiber 3.00
4 Kran tembok 5.00
5 Floor drain 5.00
6 Westafel 3.00
7 Afur Westafel + Saringan 0.00
8 Kaca Cermin 3.00

nitary

IX PEKERJAAN PENGECATAN
1 Cat tembok dalam 6.60 1.15 7.59 5.00 37.95
Rster 0.60 0.20 0.12 -5.00 -0.60
37.35

2 Cat tembok luar 22.50 2.75 61.88 2.00 123.75


2.00 0.50 1.00 1.00 1.00
p1 0.70 2.40 1.68 -5.00 -8.40
Rts 0.60 0.20 0.12 -5.00 -0.60
115.75

1 Cat Pintu type P1 38.16


a. Kusen pintu kayu besi 6x12 0.25 4.80 9.00 10.80

b. Daun pintu panel kayu besi 1.60 1.90 9.00 27.36

X PEKERJAAN ATAP
Kolom
1 Kuda kuda kayu besi 5 x 10 cm
Kuda-kuda 1 teras 0.05 0.10 0.01 4.00 2.70 0.05
atap induk 0.05 0.10 0.01 4.00 5.80 0.12
0.17
0.19
2 Gording kuda kayu besi 5 x 10 cm 0.05 0.10 0.01 4.00 21.20 0.42

0.42

5 Atap Seng Gelombang BJLS 20 54.06


10.60 3.45 36.57 1.00 36.57
10.60 1.65 17.49 1.00 17.49
Seng Bubungan BJLS 20 0.40 9.60 1.00 9.60

Nok Atap 0.05 0.10 0.01 1.00 4.00 0.02

Flashing atap 4.00 1.00

6 Lisplank kayu besi 2 x 24 cm 10.60 2.00


3.36 2.00
1.50 2.00

7 Cat lisplank 0.28 30.92 1.00 8.50

XI PEKERJAAN MEKANIKAL
A. PEKERJAAN MEKANIKAL
1 Instalasi air bersih
Bahan : pipa PVC Wavin AW
a. Diameter ¾" 30.00
a. Diameter1" 20.00
a. Diameter1¼" 48.00
a. Diameter 2" 12.00
a. Diameter 3" 4.50
2 Instalasi air kotor
Bahan : pipa PVC Wavin AW
a. Diameter 3" 24.00
b. Diameter 4" 24.00
3 Fitting dan accessories 1.00
4 Ball valve diameter 2" 1.00
5 Bak kontrol 40 x 40 x 40 + tutup plat beton 1.00
6 Tandon Air Kapasitas 1.100 Ltr 3.00
7 Menara Air Kapasitas 1.100 Ltt, Tinggi 2.5 M' 3.00
8 Jet Pump Kapasitas 28-32 LPM, Daya 600 Watt 1.00

0.00

0.00

3. Sloef Beton ( 20 x 20 ) cm 0.20 0.20 0.04 56.00 1.00 2.24 2.24

4. Balok Atas ( 20 x 15 ) cm 0.20 0.15 0.03 56.00 1.00 1.68 1.68


ME ITEM PEKERJAAN STRUKTUR

Volume
KET
(M')

(191.49)
12433570

36.50
20.00
9.60
66.10

55.357
39.96

(191.49)

7.008

80.09

3.50

0.00
0.00
0.00
0.00

4.00

4.00
4.00

21.20
6.72
3.00
30.92
VOLUME ITEM PEKERJAAN STRUKTU

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN PAGAR KEBUN PERCONTOHAN
LOKASI : JL. POROS SP.II - SP.V, KABUPATEN MIMIKA - PAPUA
TAHUN ANGGARAN : 2014

Dimensi
lebar
No. Item Pekerjaan a b
(M') (M') (M²)

0 Pembersihan lokasi 2.00

1 Galian tanah
0.30

Timbunan penambahan elevasi


Toilet 2.05
Teras 0.80
Tangga 0.40
Tangga 0.40

Pondasi batu kosong 0.40


Pondasi batu kali 0.20 0.40 0.30
Sloof Beton 0.10

Pondasi rolag 2.00

Rabat 1.70

Pondasi Tandon 1.60

2 Pasangan 4.48 3.80

1 Pasangan
Dinding dinding
bata bata tela tebal ½ bata, ad 1 : 5
3.90
1.70
Pintu 0.78
2 Dinding Sekat Kamar mandi Lama 1.05
Pintu 0.70

Dinding Bak Air 1.50

3 Plesteran + acian, ad. 1 : 5


Roster 6.40
1.05

4 Pasang Glas Block 0.20


0.20

5 Tiang kolom praktis 0.10

6 Ring balok praktis RB ad. 1:2:3, uk. 10 x 15 cm 0.10

V PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pintu type P1
a. Kusen pintu kayu besi 6x12 0.05
jalusi 0.02

b. Daun pintu panel kayu besi 0.70

c. Roster
KUSEN 0.05
Jalusi 0.02
d. Engsel Pintu
e. Kunci oval ss. steel

VI PEKERJAAN LANGIT-LANGIT
1 Plafond triplek 4 mm mm mm rangka kayu klas II
dalam 1.70
luar 1.00
0.80

2 List plafond 1.70


3.90
1.70
0.98

an Langit-Langit

VII PEKERJAAN LANTAI


1 Keramik Lantai toilet 25 x 25 cm
toilet 1.70

2 Ganti Keramik Lantai Kamar Mandi Lama 25 x 25 cm 3.40

4 Ganti Keramik dibawah Westafel 60 x 60 cm


0.74
0.26
Tamba Ganti Keramik depan Westafel & Km baru 60 x 60 cm 3.60

5 Keramik dinding 20 x 25 cm 6.40


Bak Mandi 1.55
Km Lama 1.05

6 Kuku Macan uk. 10 cm

7 Bongkar Keramik Lama


Bawah Westafel 2.45
Toilet baru 4.48
KM/Toilet lama 3.40

0.56

VIII PEKERJAAN SANITARY


1 Kloset Dukduk
2 Kloset Jongkok
3 Bak air fiber
4 Kran tembok
5 Floor drain
6 Westafel
7 Urinuir
8 Kaca Cermin

itary

IX PEKERJAAN PENGECATAN
1 Cat tembok dalam 7.10
Pintu 0.70
Rstr 6.40

Dalam Km Lama 9.72

2 Cat tembok luar 5.86


p1 0.70

1 Cat Pintu type P1


a. Kusen pintu kayu besi 6x12
jalusi

b. Daun pintu panel kayu besi

4 Roster Kusen
Jelusi

Total

X PEKERJAAN ATAP
Kolom
1 Kuda kuda kayu besi 5 x 10 cm
Kuda-kuda 1 teras 0.05
atap induk 0.05

2 Gording kuda kayu besi 5 x 10 cm 0.05

5 Atap Seng Gelombang BJLS 20


10.60
10.60
Seng Bubungan BJLS 20
Nok Atap 0.05

Flashing atap

6 Lisplank kayu besi 2 x 24 cm

7 Cat lisplank

XI PEKERJAAN MEKANIKAL
A. PEKERJAAN MEKANIKAL
1 Instalasi air bersih
Bahan : pipa PVC Wavin AW
a. Diameter ¾"
a. Diameter1"
a. Diameter1¼"
a. Diameter 2"
a. Diameter 3"
2 Instalasi air kotor
Bahan : pipa PVC Wavin AW
a. Diameter 3"
b. Diameter 4"
3 Fitting dan accessories
4 Ball valve diameter 2"
5 Bak kontrol 40 x 40 x 40 + tutup plat beton
6 Tandon Air Kapasitas 1.100 Ltr
7 Menara Air Kapasitas 1.100 Ltt, Tinggi 2.5 M'
8 Jet Pump Kapasitas 20-26 LPM, Daya 500 Watt
3. Sloef Beton ( 20 x 20 ) cm 0.20 0.20 0.04

4. Balok Atas ( 20 x 15 ) cm 0.20 0.15 0.03


5. Sloef Beton ( 20 x 20 ) cm 0.20 0.20 0.04
ERJAAN STRUKTUR

272.40
Tinggi Luas Panjang Jumlah Volume Volume Volume
KET
(M') (M') (BH) M³ (M²) (M')

5.00 1.00 10.00

1.10
0.50 0.15 7.30 1.00 1.10

30.46
1.10 2.26 8.20 1.00 18.49
1.10 0.88 8.20 1.00 7.22
0.85 0.34 8.20 1.00 2.79
0.60 0.24 8.20 1.00 1.97

0.20 0.08 7.30 1.00 0.58


1.30 0.39 7.30 1.00 2.85
0.15 0.02 7.30 1.00 0.11

8.60 17.20 0.10 1.00 1.72 0.00

0.08 0.14 3.50 1.00 0.48

0.20 0.32 4.20 1.00 1.34

0.68

16.07
2.65 10.34 1.00 10.34
2.65 4.51 2.00 9.01
2.10 1.64 -2.00 -3.28
2.95 3.10 1.00 3.10
2.10 1.47 -1.00 -1.47
1.63
0.80 1.20 2.00 2.40
21.72

1.63

1.60 10.24 -2.00 -20.48


1.75 1.84 -2.00 -3.68
43.45
19.29

0.20 0.04 6.00 0.24


0.20 0.04 2.00 0.08

0.10 0.01 2.65 5.00 0.13

0.15 0.02 7.30 1.00 0.11

0.10 0.01 5.30 3.00 0.08


0.10 0.00 0.72 6.00 0.00
0.08 12433570 988468.8
2.15 1.51 3.00 4.52

0.00
0.10 0.01 2.00 5.00 0.05
0.10 0.00 1.80 10.00 0.04
6.00
3.00

6.29 12.24
1.85 3.15 2.00 6.29
9.00 9.00 2.00 0.00
4.45 3.56 2.00 0.00
5.95
1.85 7.10 2.00 14.20
0.00 3.90 1.00 3.90
0.00 1.70 1.00 1.70
0.00 0.98 2.00 1.96
21.76

12.24
1.85 3.15 2.00 6.29

1.75 5.95 1.00 5.95

3.64
2.45 1.81 1.00 1.81
7.03 1.83 1.00 1.83
1.14 4.10 1.00 4.10

1.60 10.24 2.00 20.48


1.55 2.40 2.00 9.61
1.75 1.84 2.00 7.35
30.09
0.10 0.80 3.00 2.40

16.99
0.74 1.81 1.00 1.81
2.06 9.23 1.00 9.23
1.75 5.95 1.00 5.95

3.00
0.00
0.00
4.00
4.00
2.00
1.00
2.00
2.95 20.95 2.00 41.89
2.15 1.51 -2.00 -3.01
1.35 8.64 -2.00 -17.28
21.60

1.20 11.66 1.00 11.66


11.66
33.26

2.75 16.12 2.00 32.23


2.15 1.51 -2.00 -3.01
29.22

0.21 5.30 4.00 4.45


0.24 0.70 10.00 1.68

1.40 2.05 4.00 11.48

0.21 2.00 5.00 2.10


0.24 0.60 10.00 1.44
21.15

0.10 0.01 4.00 2.70 0.05


0.10 0.01 4.00 5.80 0.12
0.17
0.19
0.10 0.01 4.00 21.20 0.42

0.42

54.06
3.45 36.57 1.00 36.57
1.65 17.49 1.00 17.49
0.50 9.60 1.00 4.80
0.10 0.01 1.00 4.00 0.02 4.00

4.00
4.00 1.00 4.00

10.60 2.00 21.20


3.36 2.00 6.72
1.50 2.00 3.00
30.92
0.28 30.92 1.00 8.50

12.50
5.00
12.00
14.00
5.00

15.00
12.50
1.00
1.00
1.00
4.00
3.00
1.00
0.00

0.00

56.00 1.00 2.24 2.24

56.00 1.00 1.68 1.68


1.70 19.00 1.29 1.29