HARGA HARGA
No. URAIAN KODE KETERANGAN SATUAN PERJAM SATUAN PERHARI
( Rp.) ( Rp.)
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
Atap Plastik :
1 - Warna Putih Arcylic Lbr Rp 107,700.00
2 - Fiber Class Lbr Rp 123,300.00
- Asbes gelombang besar uk. 105 x 180,5 mm Lbr #DIV/0!
- Asbes gelombang besar uk. 80 x 180,4 mm Lbr #DIV/0!
- Asbes gelombang uk 92 x 250 Lbr #DIV/0!
3 - Asbes semen Lbr Rp 37,200.00
#DIV/0!
- Genteng palentong Lbr #DIV/0!
- Genteng kodok Lbr #DIV/0!
- Nok paten 92 cm Lbr #DIV/0!
- Genteng Beton Lbr #DIV/0!
- Genteng aspal Lbr #DIV/0!
- Genteng Metal Lbr #DIV/0!
Onduline
- Genteng Bitumen Selusa Uk. 160 cm x 40 cm Lembar Rp 47,700.00
- Asesoris Nok/Ridge Lembar Rp 82,500.00
- Nok Asesoris Flashing Samping/Verge Piece Lembar Rp 76,800.00
- Atap Bitumen Bergelombang 3 mm H 38 Lembar Rp 152,500.00
- Screw Bh Rp 1,200.00
KERAMIK
Bentuk OFF/FWT ( KW I )
- Type G (20 x 20) cm M² Rp -
- Type H (20 x 20) cm M² Rp -
- Type J (20 x 20) cm M² Rp -
- Type K (20 x 20) cm M² Rp -
- Type D (10 x 10) cm M² Rp -
- Type E (10 x 10) cm/Masterina M² Rp -
- Type F (10 x 10) cm M² Rp -
Bentuk OFF/FWT ( KW II )
- Type G (20 x 20) cm M² Rp 82,400.00
- Type H (20 x 20) cm M² Rp 93,800.00
Untuk Dinding :
- Uk. (10 x 20) cm M² #DIV/0!
- Uk. (20 x 20) cm M² #DIV/0!
- Uk. (20 x 25) cm M² Rp -
F. PENGGANTUNG/PENGUNCI
- Merk Jangkar 9702 RRC/692 LD/MAXEL/KODAI/dll Set Rp 101,400.00
- Jangkar 746/Kodai/dll Set Rp 87,500.00
Harga Dasar Upah dan Bahan 12 dari 204
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
- Merk Ciga Brown 5404 Set Rp 136,800.00
- Merk Ciga Brown 5009 Set #DIV/0!
- Kunci Mandili 450 Itali/Seiss Set #DIV/0!
- Kunci Antik A/C Itali/Seiss Set Rp 274,200.00
- Kunci Shanghai 9702 LD Set Rp 91,700.00
- Grendel Antik 2 Set Rp 14,400.00
- Tarikan Antik Jendela Set Rp 33,600.00
- Engsel Nylon Set Rp 20,600.00
- Engsel Lokal Set Rp 16,400.00
- Engsel 4" (Kuningan) Set Rp 31,200.00
- Engsel 4' (Biasa) Set Rp 21,000.00
- Engsel 3" (Kuningan) Set Rp 22,600.00
- Engsel 3" (Biasa) Set Rp 14,900.00
- Hak Angin unit Rp 15,200.00
- Handle Pintu (cisa) Unit Rp 199,100.00
- Kunci Mandili 450 Itali/Seiss Set Rp 287,400.00
- Kunci Lemari Set Rp 22,500.00
Pipa PVC AW
- Diameter 10 " M' Rp 425,600.00
- Diameter 8 " M' Rp 273,700.00
- Diameter 6 " M' Rp 163,600.00
- Diameter 4 " M' Rp 69,900.00
- Diameter 3 " M' Rp 49,200.00
- Diameter 2 1/2 " M' Rp 34,000.00
- Diameter 2 " M' Rp 22,700.00
- Diameter 1 1/2" M' Rp 17,600.00
- Diameter 1 " M' Rp 14,100.00
- Diameter 3/4 " M' Rp 10,700.00
- Diameter 1/2 " M' Rp 7,600.00
Tee PVC
- Diameter 8" M' Rp 402,900.00
- Diameter 6" M' Rp 194,300.00
- Diameter 4" M' Rp 77,100.00
- Diameter 3" M' Rp 38,600.00
- Diameter 2 1/2 " M' Rp 25,000.00
- Diameter 2" M' Rp 16,500.00
- Diameter 1 1/2" M' Rp 10,300.00
- Diameter 1" M' Rp 4,700.00
- Diameter 3/4 " M' Rp 2,800.00
- Diameter 1/2 " M' Rp 2,000.00
All Flanged Bend Diameter 45, 22, 1/2 ; 11, 1/4 degree ( GIP )
- Diameter Nominal 200 mm Bh Rp 1,620,000.00
- Diameter Nominal 150 mm Bh Rp 1,025,000.00
- Diameter Nominal 125 mm Bh Rp 760,000.00
- Diameter Nominal 100 mm Bh Rp 560,000.00
- Diameter Nominal 75 mm Bh Rp 430,000.00
- Diameter Nominal 50 mm Bh Rp 265,000.00
Flange Ring
- Diameter Nominal 400 mm Bh Rp 796,000.00
- Diameter Nominal 350 mm Bh Rp 632,000.00
- Diameter Nominal 300 mm Bh Rp 408,000.00
- Diameter Nominal 250 mm Bh Rp 385,000.00
- Diameter Nominal 200 mm Bh Rp 258,000.00
- Diameter Nominal 150 mm Bh Rp 193,000.00
- Diameter Nominal 125 mm Bh Rp 135,500.00
- Diameter Nominal 100 mm Bh Rp 105,000.00
- Diameter Nominal 75 mm Bh Rp 90,000.00
- Diameter Nominal 50 mm Bh Rp 75,000.00
Blank Flange
- Diameter Nominal 200 mm Bh Rp 529,500.00
- Diameter Nominal 150 mm Bh Rp 364,500.00
- Diameter Nominal 125 mm Bh Rp 265,000.00
- Diameter Nominal 100 mm Bh Rp 199,500.00
Harga Dasar Upah dan Bahan 17 dari 204
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
- Diameter Nominal 75 mm Bh Rp 165,000.00
- Diameter Nominal 50 mm Bh Rp 99,500.00
Box Street CI
- Diameter Nominal 200 mm Bh Rp 399,000.00
- Diameter Nominal 150 mm Bh Rp 235,100.00
- Diameter Nominal 125 mm Bh Rp 194,700.00
- Diameter Nominal 100 mm Bh Rp 169,500.00
- Diameter Nominal 75 mm Bh Rp 123,500.00
- Diameter Nominal 50 mm Bh Rp 104,500.00
Air Valve
- Diameter Nominal 100 mm Bh Rp 5,150,000.00
- Diameter Nominal 75 mm Bh Rp 3,650,000.00
- Diameter Nominal 50 mm Bh Rp 3,000,000.00
- Diameter Nominal 25 mm Bh Rp 1,000,000.00
Karet Packing
- Diameter Nominal 200 mm Bh Rp 32,500.00
- Diameter Nominal 150 mm Bh Rp 24,500.00
- Diameter Nominal 100 mm Bh Rp 15,500.00
- Diameter Nominal 75 mm Bh Rp 12,000.00
- Diameter Nominal 50 mm Bh Rp 7,800.00
Reducer PVC
- Diameter Nominal 200 x 150 mm Bh Rp 799,100.00
- Diameter Nominal 200 x 100 mm Bh Rp 1,155,500.00
- Diameter Nominal 200 x 75 mm Bh Rp 1,118,500.00
- Diameter Nominal 200 x 50 mm Bh Rp 1,052,700.00
- Diameter Nominal 150 x 100 mm Bh Rp 438,800.00
- Diameter Nominal 150 x 75 mm Bh Rp 562,300.00
- Diameter Nominal 150 x 50 mm Bh Rp 462,700.00
- Diameter Nominal 100 x 75 mm Bh Rp 228,700.00
- Diameter Nominal 100 x 50 mm Bh Rp 218,100.00
- Diameter Nominal 75 x 50 mm Bh Rp 234,800.00
Water Meter
- Diameter Nominal 200 mm Bh Rp 19,000,000.00
- Diameter Nominal 150 mm Bh Rp 14,500,000.00
- Diameter Nominal 100 mm Bh Rp 8,500,000.00
- Diameter Nominal 75 mm Bh Rp 7,000,000.00
- Diameter Nominal 50 mm Bh Rp 5,800,000.00
- Diameter Nominal 40 mm Bh Rp 2,500,000.00
- Diameter Nominal 32 mm Bh Rp 2,000,000.00
- Diameter Nominal 25 mm Bh Rp 1,750,000.00
- Diameter Nominal 20 mm Bh Rp 720,000.00
- Diameter Nominal 15 mm Bh Rp 330,000.00
Baut - Mour
- Baut dia. 5/8'' x 3'' Bh Rp 5,000.00
- Baut dia. 5/8'' x 4'' Bh Rp 7,200.00
- Baut dia. 3/4'' x 3'' Bh Rp 10,700.00
- Baut dia. 3/4'' x 4'' Bh Rp 12,700.00
Screen Diameter
- Screen Diameter 4" Bh Rp 445,000.00
- Screen Diameter 6" Bh Rp 550,000.00
- Screen Diameter 8" Bh Rp 927,500.00
Water Stop
- Waterstop PVC 150 mm M Rp 96,300.00
- Waterstop PVC 200 mm M Rp 125,900.00
- Waterstop PVC 270 mm M Rp 135,000.00
- Waterstop rubber lebar 150 mm - 200 mm M Rp 103,200.00
I PEKERJAAN PERSIAPAN
II PEKERJAAN BONGKARAN
1 Pembongkaran 1 m3 dinding tembok bata A.2.2.1.14 M3 Rp 834,141.00
2 Pembongkaran 1 m2 Keramik A.2.2.1.14.a M2 Rp 7,700.00
IV PEKERJAAN BETON
1 Membuat Lantai kerja beton mutu f3c = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,66 A.4.1.1.5 M3 Rp 957,798.73
2 Pembesian 10 kg dengan besi polos atau besi ulir A.4.1.1.17 Kg Rp 14,726.80
3 Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21 M2 Rp 248,469.65
4 Pemasangan 1 m2 bekisting untuk Lantai A.4.1.1.24 M2 Rp 388,832.95
V PEKERJAAN DINDING
1 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang A.4.4.1.9 M2 Rp 133,901.68
VI PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm A.4.4.2.4 M2 Rp 78,348.60
2 Pemasangan 1 m2 Acian A.4.4.2.27 M2 Rp 47,883.00
IX PEKERJAAN KAYU
1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III A.4.6.1.2 M3 Rp 8,111,917.00
2 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II A.4.6.1.5 M2 Rp 816,624.60
XI PEKERJAAN PENGECATAN
1 Pengikisan/pengerokan permukaan cat lama A.4.7.1.1 M2 Rp 19,387.50
2 Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,2 lapis cat penutup) A.4.7.1.4 M2 Rp 49,820.10
:Dibuat oleh
KONSULTAN PERENCANA
CV. GREEN RISE CONSULTANT
ALDY, ST
Team Leader
JENIS PEKERJAAN : A.2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 314,889.74
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 105,000.00 42,000.00
Tukang Kayu L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0200 175,000.00 3,500.00
JUMLAH TENAGA KERJA 79,000.00
B BAHAN
Dolken kayu φ 8-10 Cm Batang 1.2500 34,100.00 42,625.00
Semen Portland Kg 5.0000 1,240.00 6,200.00
Pasir beton m3 0.0050 176,500.00 882.50
Koral beton m3 0.0090 174,300.00 1,568.70
Kayu 5/7 m3 0.0720 1,962,100.00 141,271.20
Paku biasa 2" - 5" Kg 0.0600 18,600.00 1,116.00
Residu Liter 0.4000 34,000.00 13,600.00
JUMLAH HARGA BAHAN 207,263.40
C PERALATAN
JENIS PEKERJAAN : A.2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 399,232.24
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang Kayu L.02 OH 0.4000 150,000.00 60,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0200 175,000.00 3,500.00
JUMLAH TENAGA KERJA 88,000.00
B BAHAN
Dolken kayu φ 8-10 Cm Batang 1.2500 34,100.00 42,625.00
Semen Portland Kg 2.5000 1,240.00 3,100.00
Seng gelombang Lbr 1.2000 55,200.00 66,240.00
Pasir beton m3 0.0050 176,500.00 882.50
Koral beton m3 0.0090 174,300.00 1,568.70
Kayu 5/7 m3 0.0720 1,962,100.00 141,271.20
Paku biasa 2" - 5" Kg 0.0600 18,600.00 1,116.00
Meni besi Liter 0.4500 40,300.00 18,135.00
JUMLAH HARGA BAHAN 274,938.40
C PERALATAN
JENIS PEKERJAAN : A.2.2.1.3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
SATUAN : M2
HARGA SATUAN PEKERJAAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang Kayu L.02 OH 0.3000 150,000.00 45,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0200 175,000.00 3,500.00
JUMLAH TENAGA KERJA 73,000.00
B BAHAN
Dolken kayu φ 8-10 Cm Batang 1.0000 34,100.00 34,100.00
Semen Portland Kg 2.0000 1,240.00 2,480.00
Kawat duri M1 25.0000 Err:509 Err:509
Pasir beton m3 0.0050 176,500.00 882.50
Koral beton m3 0.0090 174,300.00 1,568.70
Paku biasa 2" - 5" Kg 0.0600 18,600.00 1,116.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang Kayu L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 28,125.00
B BAHAN
Kayu balok 5/7 m3 0.0120 2,446,500.00 29,358.00
Paku biasa 2" - 5" Kg 0.0200 18,600.00 372.00
Kayu papan 3/20 m3 0.0070 2,582,700.00 18,078.90
JUMLAH HARGA BAHAN 47,808.90
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 2.0000 105,000.00 210,000.00
Tukang Kayu L.02 OH 2.0000 150,000.00 300,000.00
Tukang Batu L.02 OH 1.0000 150,000.00 150,000.00
Kepala tukang L.03 OH 0.3000 175,000.00 52,500.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 721,250.00
B BAHAN
Dolken kayu φ 8-10 Cm/400 Batang 1.2500 34,100.00 42,625.00
Kayu m3 0.1800 2,582,700.00 464,886.00
Paku biasa Kg 0.0800 18,600.00 1,488.00
Besi Strip Kg 1.1000 Err:509 Err:509
Semen Portland Kg 35.0000 1,240.00 43,400.00
Pasir Pasang m3 0.1500 176,600.00 26,490.00
Pasir beton m3 0.1000 176,500.00 17,650.00
Koral beton m3 0.1500 174,300.00 26,145.00
Bata Merah Bh 30.0000 700.00 21,000.00
Seng plat Lbr 0.2500 Err:509 Err:509
Jendela naco bh 0.2000 189,100.00 37,820.00
Kaca polos m2 0.0800 105,700.00 8,456.00
Kunci tanam Bh 0.1500 91,700.00 13,755.00
Plywood 4 mm Lbr 0.0600 83,700.00 5,022.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang Kayu L.02 OH 1.5000 150,000.00 225,000.00
Kepala tukang L.03 OH 0.1500 175,000.00 26,250.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 365,000.00
B BAHAN
Dolken kayu φ 8-10 Cm/400 cm Batang 3.0000 34,100.00 102,300.00
Kayu m3 0.2760 2,582,700.00 712,825.20
Paku biasa Kg 0.7000 18,600.00 13,020.00
Seng gelombang lbr 1.5000 55,200.00 82,800.00
JUMLAH HARGA BAHAN 910,945.20
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang Kayu L.02 OH 2.0000 150,000.00 300,000.00
Kepala tukang L.03 OH 0.2000 175,000.00 35,000.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 448,750.00
B BAHAN
Dolken kayu φ 8-10 Cm Batang 1.7000 34,100.00 57,970.00
Kayu m3 0.2100 2,582,700.00 542,367.00
Paku biasa Kg 0.3000 18,600.00 5,580.00
Semen Portland Kg 10.5000 1,240.00 13,020.00
Pasir beton m3 0.0300 176,500.00 5,295.00
Koral beton m3 0.0500 174,300.00 8,715.00
Seng gelombang lbr 1.5000 55,200.00 82,800.00
Seng plat lbr 0.2500 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang Kayu L.02 OH 2.0000 150,000.00 300,000.00
Kepala tukang L.03 OH 0.2000 175,000.00 35,000.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 448,750.00
B BAHAN
Dolken kayu φ 8-10 Cm Batang 1.2500 34,100.00 42,625.00
Kayu m3 0.1860 2,582,700.00 480,382.20
Paku biasa Kg 0.3000 18,600.00 5,580.00
Semen Portland Kg 18.0000 1,240.00 22,320.00
Pasir beton m3 0.0300 176,500.00 5,295.00
Koral beton m3 0.0500 174,300.00 8,715.00
Seng gelombang lbr 1.5000 55,200.00 82,800.00
Plywood 4 mm lbr 1.3500 83,700.00 112,995.00
JUMLAH HARGA BAHAN 760,712.20
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 19,250.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 19,250.00
E Overhead & profit 10% x Jumlah 1,925.00
F Harga Satuan Pekerjaan (D+E) 21,175.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang Kayu L.02 OH 2.0000 150,000.00 300,000.00
Kepala tukang L.03 OH 0.2000 175,000.00 35,000.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 448,750.00
B BAHAN
Bambu diameter 6-8/600 Cm Batang 1.2500 a #VALUE!
Tali ijuk m3 0.1860 24,000.00 4,464.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Tukang Kayu L.02 OH 0.3000 150,000.00 45,000.00
Kepala tukang L.03 OH 0.0300 175,000.00 5,250.00
JUMLAH TENAGA KERJA 50,250.00
B BAHAN
Kayu papan kelas III m2 0.0360 2,582,700.00 92,977.20
Kayu Balok kelas III m3 0.0140 2,446,500.00 34,251.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 150,000.00 150,000.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 150,875.00
B BAHAN
Batu belah m3 0.1500 172,400.00 25,860.00
Batu pecah m3 0.0900 283,600.00 25,524.00
Pasir Pasang Kg 0.0100 176,600.00 1,766.00
JUMLAH HARGA BAHAN 53,150.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 13.3340 105,000.00 1,400,070.00
Mandor L.04 OH 0.6660 175,000.00 116,550.00
JUMLAH TENAGA KERJA 1,516,620.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 6.6670 105,000.00 700,035.00
Mandor L.04 OH 0.3330 175,000.00 58,275.00
JUMLAH TENAGA KERJA 758,310.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 105,000.00 5,250.00
Mandor L.04 OH 0.0100 175,000.00 1,750.00
JUMLAH TENAGA KERJA 7,000.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0420 105,000.00 4,410.00
Tukang Kayu L.02 OH 0.0040 150,000.00 600.00
Kepala tukang L.03 OH 0.0020 175,000.00 350.00
Mandor L.04 OH 0.0420 175,000.00 7,350.00
JUMLAH TENAGA KERJA 12,710.00
B BAHAN
Kawat jaring Lbr 0.1434 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3750 105,000.00 39,375.00
Tukang Kayu L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0190 175,000.00 3,325.00
JUMLAH TENAGA KERJA 63,550.00
B BAHAN
Panel beton pracetak Lbr 0.9860 a #VALUE!
Kolom beton pracetak Batang 0.5250 a #VALUE!
Semen Portland Kg 45.0000 1,240.00 55,800.00
Pasir beton m3 0.0740 176,500.00 13,061.00
Koral m3 0.1460 174,300.00 25,447.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 105,000.00 78,750.00
Mandor L.04 OH 0.0250 175,000.00 4,375.00
JUMLAH TENAGA KERJA 83,125.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 102,375.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0500 105,000.00 110,250.00
Mandor L.04 OH 0.0670 175,000.00 11,725.00
JUMLAH TENAGA KERJA 121,975.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Mandor L.04 OH 0.0320 175,000.00 5,600.00
JUMLAH TENAGA KERJA 110,600.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 105,000.00 157,500.00
Mandor L.04 OH 0.0600 175,000.00 10,500.00
JUMLAH TENAGA KERJA 168,000.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 105,000.00 126,000.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 133,875.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 105,000.00 5,250.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 6,125.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3300 105,000.00 34,650.00
Mandor L.04 OH 0.0100 175,000.00 1,750.00
JUMLAH TENAGA KERJA 36,400.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 105,000.00 52,500.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 61,250.00
B BAHAN
A TENAGA
Pekerja L.01 OH 0.5000 105,000.00 52,500.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 61,250.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Mandor L.04 OH 0.0100 175,000.00 1,750.00
JUMLAH TENAGA KERJA 33,250.00
B BAHAN
Pasir urug m3 1.2000 115,800.00 138,960.00
JUMLAH HARGA BAHAN 138,960.00
C PERALATAN
JENIS PEKERJAAN : A.2.3.1.12 Pemasangan 1 m3 lapisan pudel Camp, 1Kapur Padam : 3 Pasir Pasang : 7TL
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 502,143.40
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 105,000.00 84,000.00
Tukang L.02 OH 0.4000 150,000.00 60,000.00
Kepala tukang L.03 OH 0.0400 175,000.00 7,000.00
Mandor L.04 OH 0.0800 175,000.00 14,000.00
JUMLAH TENAGA KERJA 165,000.00
B BAHAN
Kapur m3 0.1350 860,000.00 116,100.00
Pasir Pasang m3 0.4000 176,600.00 70,640.00
Tanah liat m3 0.9480 110,500.00 104,754.00
JUMLAH HARGA BAHAN 291,494.00
C PERALATAN
JENIS PEKERJAAN : A.2.3.1.13 Pemasangan 1 m2 lapisan ijuk tebal 10 Cm untuk bidang resapan
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 178,612.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 18,375.00
B BAHAN
Ijuk m3 6.0000 24,000.00 144,000.00
JUMLAH HARGA BAHAN 144,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Mandor L.04 OH 0.0250 175,000.00 4,375.00
JUMLAH TENAGA KERJA 30,625.00
B BAHAN
Sirtu m3 1.2000 171,400.00 205,680.00
JUMLAH HARGA BAHAN 205,680.00
C PERALATAN
JENIS PEKERJAAN : A.3.2.1.1 Pemasangan 1 m3 pondasi batu belah Camp, 1PC : 3 Pasir Pasang
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 923,187.10
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 105,000.00 157,500.00
Tukang L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0750 175,000.00 13,125.00
Mandor L.04 OH 0.0750 175,000.00 13,125.00
JUMLAH TENAGA KERJA 296,250.00
B BAHAN
Batu belah m3 1.2000 172,400.00 206,880.00
Semen Portland Kg 202.0000 1,240.00 250,480.00
Pasir Pasang m3 0.4850 176,600.00 85,651.00
JUMLAH HARGA BAHAN 543,011.00
C PERALATAN
JENIS PEKERJAAN : A.3.2.1.2 Pemasangan 1 m3 pondasi batu belah Camp, 1PC : 4 Pasir Pasang
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 876,790.20
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 105,000.00 157,500.00
Tukang L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0750 175,000.00 13,125.00
Mandor L.04 OH 0.0750 175,000.00 13,125.00
JUMLAH TENAGA KERJA 296,250.00
B BAHAN
Batu belah m3 1.2000 172,400.00 206,880.00
Semen Portland Kg 163.0000 1,240.00 202,120.00
Pasir Pasang m3 0.5200 176,600.00 91,832.00
JUMLAH HARGA BAHAN 500,832.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 105,000.00 157,500.00
Tukang L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0750 175,000.00 13,125.00
Mandor L.04 OH 0.0750 175,000.00 13,125.00
JUMLAH TENAGA KERJA 296,250.00
B BAHAN
Batu belah m3 1.2000 172,400.00 206,880.00
Semen Portland Kg 136.0000 1,240.00 168,640.00
Pasir Pasang m3 0.5440 176,600.00 96,070.40
JUMLAH HARGA BAHAN 471,590.40
C PERALATAN
JENIS PEKERJAAN : A.3.2.1.4 Pemasangan 1 m3 pondasi batu belah Camp, 1PC : 6 Pasir Pasang
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 822,010.86
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 105,000.00 157,500.00
Tukang L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0750 175,000.00 13,125.00
Mandor L.04 OH 0.0750 175,000.00 13,125.00
JUMLAH TENAGA KERJA 296,250.00
B BAHAN
Batu belah m3 1.2000 172,400.00 206,880.00
Semen Portland Kg 117.0000 1,240.00 145,080.00
Pasir Pasang m3 0.5610 176,600.00 99,072.60
JUMLAH HARGA BAHAN 451,032.60
C PERALATAN
JENIS PEKERJAAN : A.3.2.1.5 Pemasangan 1 m3 pondasi batu belah Camp, 1PC : 8 Pasir Pasang
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 791,014.84
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 105,000.00 157,500.00
Tukang L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0750 175,000.00 13,125.00
Mandor L.04 OH 0.0750 175,000.00 13,125.00
JUMLAH TENAGA KERJA 296,250.00
B BAHAN
Batu belah m3 1.2000 172,400.00 206,880.00
Semen Portland Kg 91.0000 1,240.00 112,840.00
Pasir Pasang m3 0.5840 176,600.00 103,134.40
JUMLAH HARGA BAHAN 422,854.40
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 105,000.00 157,500.00
Tukang L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0750 175,000.00 13,125.00
Mandor L.04 OH 0.0750 175,000.00 13,125.00
JUMLAH TENAGA KERJA 296,250.00
B BAHAN
Batu belah m3 1.2000 172,400.00 206,880.00
Kapur m3 0.1700 860,000.00 146,200.00
Semen Portland Kg 0.1700 1,240.00 210.80
Pasir Pasang m3 0.3400 176,600.00 60,044.00
JUMLAH HARGA BAHAN 413,334.80
C PERALATAN
JENIS PEKERJAAN : A.3.2.1.7 Pemasangan 1 m3 pondasi batu belah Camp, 1PC : 3Kapur Padam : 10 Pasir Pasang
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 871,284.92
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 105,000.00 157,500.00
Tukang L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0750 175,000.00 13,125.00
Mandor L.04 OH 0.0750 175,000.00 13,125.00
JUMLAH TENAGA KERJA 296,250.00
B BAHAN
Batu belah m3 1.2000 172,400.00 206,880.00
Semen Portland Kg 61.0000 1,240.00 75,640.00
Kapur m3 0.1470 860,000.00 126,420.00
Pasir Pasang m3 0.4920 176,600.00 86,887.20
JUMLAH HARGA BAHAN 495,827.20
C PERALATAN
JENIS PEKERJAAN : A.3.2.1.8 Pemasangan 1 m3 pondasi batu belah Camp, 1/4 PC : 1Kapur Padam : 4 Pasir Pasang
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 834,890.98
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 105,000.00 157,500.00
Tukang batu L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0750 175,000.00 13,125.00
Mandor L.04 OH 0.0750 175,000.00 13,125.00
JUMLAH TENAGA KERJA 296,250.00
B BAHAN
Batu belah m3 1.2000 172,400.00 206,880.00
Semen Portland Kg 41.0000 1,240.00 50,840.00
Kapur m3 0.1310 860,000.00 112,660.00
Pasir Pasang m3 0.5230 176,600.00 92,361.80
JUMLAH HARGA BAHAN 462,741.80
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.7800 105,000.00 81,900.00
Tukang Batu L.02 OH 0.3900 150,000.00 58,500.00
Kepala tukang L.03 OH 0.0390 175,000.00 6,825.00
Mandor L.04 OH 0.0390 175,000.00 6,825.00
JUMLAH TENAGA KERJA 154,050.00
B BAHAN
Batu belah m3 1.2000 172,400.00 206,880.00
Pasir urug m3 0.4320 115,800.00 50,025.60
JUMLAH HARGA BAHAN 256,905.60
C PERALATAN
JENIS PEKERJAAN : A.3.2.1.10 Pemasangan 1 m3 pondasi siklop, 60% beton Camp, 1PC : 2 PB : 3 Kr dan
40% batu belah
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 2,594,171.14
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 3.4000 105,000.00 357,000.00
Tukang Batu L.02 OH 0.8500 150,000.00 127,500.00
Kepala tukang L.03 OH 0.0850 175,000.00 14,875.00
Mandor L.04 OH 0.1700 175,000.00 29,750.00
JUMLAH TENAGA KERJA 529,125.00
B BAHAN
Batu belah m3 0.4800 172,400.00 82,752.00
Semen Portland Kg 194.0000 1,240.00 240,560.00
Pasir beton m3 0.3120 176,500.00 55,068.00
Kerikil m3 0.4680 174,300.00 81,572.40
Besi beton Kg 126.0000 10,600.00 1,335,600.00
Kawat beton Kg 1.8000 18,700.00 33,660.00
JUMLAH HARGA BAHAN 1,829,212.40
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 2.4000 105,000.00 252,000.00
Tukang Batu L.02 OH 0.8000 150,000.00 120,000.00
Kepala tukang L.03 OH 0.0800 175,000.00 14,000.00
Mandor L.04 OH 0.1190 175,000.00 20,825.00
JUMLAH TENAGA KERJA 406,825.00
B BAHAN
Batu belah m3 0.4500 172,400.00 77,580.00
Semen Portland Kg 194.0000 1,240.00 240,560.00
Pasir beton m3 0.3120 176,500.00 55,068.00
Kerikil m3 0.4680 174,300.00 81,572.40
JUMLAH HARGA BAHAN 454,780.40
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.1 Membuat beton mutu f3c = 7,4 Mpa (K 100), slump (12 ± 2) Cm, w/c 0,87
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 860,898.03
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 175,000.00 4,900.00
Mandor L.04 OH 0.0830 175,000.00 14,525.00
JUMLAH TENAGA KERJA 233,925.00
B BAHAN
Semen Portland Kg 247.0000 1,240.00 306,280.00
Pasir beton Kg 869.0000 126.07 109,556.07
Kerikil (Maks 30 mm) Kg 999.0000 129.11 128,982.00
Air Liter 215.0000 18.10 3,891.50
JUMLAH HARGA BAHAN 548,709.57
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.2 Membuat beton mutu f3c = 9,8 Mpa (K 125), slump (12 ± 2) Cm, w/c 0,78
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 896,614.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 175,000.00 4,900.00
Mandor L.04 OH 0.0830 175,000.00 14,525.00
JUMLAH TENAGA KERJA 233,925.00
B BAHAN
Semen Portland Kg 276.0000 1,240.00 342,240.00
Pasir beton Kg 828.0000 126.07 104,387.14
Kerikil (Maks 30 mm) Kg 1012.0000 129.11 130,660.44
Air Liter 215.0000 18.10 3,891.50
JUMLAH HARGA BAHAN 581,179.09
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.3 Membuat beton mutu f3c = 12,2 Mpa (K 150), slump (12 ± 2) Cm, w/c 0,72
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 924,674.93
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 175,000.00 4,900.00
Mandor L.04 OH 0.0830 175,000.00 14,525.00
JUMLAH TENAGA KERJA 233,925.00
B BAHAN
Semen Portland Kg 299.0000 1,240.00 370,760.00
Pasir beton Kg 799.0000 126.07 100,731.07
Kerikil (Maks 30 mm) Kg 1017.0000 129.11 131,306.00
Air Liter 215.0000 18.10 3,891.50
JUMLAH HARGA BAHAN 606,688.57
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.4 Membuat Lantai kerja beton mutu f3c = 7,4 Mpa (K 100), slump (3 - 6) Cm, w/c 0,87
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 774,398.79
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 105,000.00 126,000.00
Tukang Batu L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0600 175,000.00 10,500.00
JUMLAH TENAGA KERJA 170,000.00
B BAHAN
Semen Portland Kg 230.0000 1,240.00 285,200.00
Pasir beton Kg 893.0000 126.07 112,581.79
Kerikil (Maks 30 mm) Kg 1027.0000 129.11 132,597.11
Air Liter 200.0000 18.10 3,620.00
JUMLAH HARGA BAHAN 533,998.90
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.5 Membuat Lantai kerja beton mutu f3c = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,66
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 957,798.73
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 175,000.00 4,900.00
Mandor L.04 OH 0.0830 175,000.00 14,525.00
JUMLAH TENAGA KERJA 233,925.00
B BAHAN
Semen Portland Kg 326.0000 1,240.00 404,240.00
Pasir beton Kg 760.0000 126.07 95,814.29
Kerikil (Maks 30 mm) Kg 1029.0000 129.11 132,855.33
Air Liter 215.0000 18.10 3,891.50
JUMLAH HARGA BAHAN 636,801.12
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.6 Membuat Lantai kerja beton mutu f3c = 16,9 Mpa (K 200), slump (12 ± 2) Cm, w/c 0,61
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 989,525.10
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 175,000.00 4,900.00
Mandor L.04 OH 0.0830 175,000.00 14,525.00
JUMLAH TENAGA KERJA 233,925.00
B BAHAN
Semen Portland Kg 352.0000 1,240.00 436,480.00
Pasir beton Kg 731.0000 126.07 92,158.21
Kerikil (Maks 30 mm) Kg 1031.0000 129.11 133,113.56
Air Liter 215.0000 18.10 3,891.50
JUMLAH HARGA BAHAN 665,643.27
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.7 Membuat Lantai kerja beton mutu f3c = 19,3 Mpa (K 225), slump (12 ± 2) Cm, w/c 0,58
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,013,137.06
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 175,000.00 4,900.00
Mandor L.04 OH 0.0830 175,000.00 14,525.00
JUMLAH TENAGA KERJA 233,925.00
B BAHAN
Semen Portland Kg 371.0000 1,240.00 460,040.00
Pasir beton Kg 698.0000 126.07 87,997.86
Kerikil (Maks 30 mm) Kg 1047.0000 129.11 135,179.33
Air Liter 215.0000 18.10 3,891.50
JUMLAH HARGA BAHAN 687,108.69
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.8 Membuat Lantai kerja beton mutu f3c = 21,7 Mpa (K 250), slump (12 ± 2) Cm, w/c 0,56
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,028,900.81
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 175,000.00 4,900.00
Mandor L.04 OH 0.0830 175,000.00 14,525.00
JUMLAH TENAGA KERJA 233,925.00
B BAHAN
Semen Portland Kg 384.0000 1,240.00 476,160.00
Pasir beton Kg 692.0000 126.07 87,241.43
Kerikil (Maks 30 mm) Kg 1039.0000 129.11 134,146.44
Air Liter 215.0000 18.10 3,891.50
JUMLAH HARGA BAHAN 701,439.37
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.9 Membuat Lantai kerja beton mutu f3c = 24,0 Mpa (K 275), slump (12 ± 2) Cm, w/c 0,53
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,055,953.09
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 175,000.00 4,900.00
Mandor L.04 OH 0.0830 175,000.00 14,525.00
JUMLAH TENAGA KERJA 233,925.00
B BAHAN
Semen Portland Kg 406.0000 1,240.00 503,440.00
Pasir beton Kg 684.0000 126.07 86,232.86
Kerikil (Maks 30 mm) Kg 1026.0000 129.11 132,468.00
Air Liter 215.0000 18.10 3,891.50
JUMLAH HARGA BAHAN 726,032.36
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.10 Membuat Lantai kerja beton mutu f3c = 26,4 Mpa (K 300), slump (12 ± 2) Cm, w/c 0,52
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,064,374.95
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 105,000.00 173,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Kepala tukang L.03 OH 0.0280 175,000.00 4,900.00
Mandor L.04 OH 0.0830 175,000.00 14,525.00
JUMLAH TENAGA KERJA 233,925.00
B BAHAN
Semen Portland Kg 413.0000 1,240.00 512,120.00
Pasir beton Kg 681.0000 126.07 85,854.64
Kerikil (Maks 30 mm) Kg 1021.0000 129.11 131,822.44
Air Liter 215.0000 18.10 3,891.50
JUMLAH HARGA BAHAN 733,688.59
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.11 Membuat Lantai kerja beton mutu f3c = 28,8 Mpa (K 325), slump (12 ± 2) Cm, w/c 0,49
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,166,115.65
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 105,000.00 220,500.00
Tukang Batu L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.1050 175,000.00 18,375.00
JUMLAH TENAGA KERJA 297,500.00
B BAHAN
Semen Portland Kg 439.0000 1,240.00 544,360.00
Pasir beton Kg 670.0000 126.07 84,467.86
Kerikil (Maks 30 mm) Kg 1006.0000 129.11 129,885.78
Air Liter 215.0000 18.10 3,891.50
JUMLAH HARGA BAHAN 762,605.13
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.12 Membuat Lantai kerja beton mutu f3c = 31,2 Mpa (K 350), slump (12 ± 2) Cm, w/c 0,48
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,177,123.48
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 105,000.00 220,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.1050 175,000.00 18,375.00
JUMLAH TENAGA KERJA 297,500.00
B BAHAN
Semen Portland Kg 448.0000 1,240.00 555,520.00
Pasir beton Kg 667.0000 126.07 84,089.64
Kerikil (Maks 30 mm) Kg 1000.0000 129.11 129,111.11
Air Liter 215.0000 18.10 3,891.50
JUMLAH HARGA BAHAN 772,612.25
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.13 Membuat beton kedap air dengan strorox - 100
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,185,954.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 105,000.00 220,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.1050 175,000.00 18,375.00
JUMLAH TENAGA KERJA 297,500.00
B BAHAN
Semen Portland Kg 400.0000 1,240.00 496,000.00
Pasir beton m3 0.4800 176,500.00 84,720.00
Kerikil (2 Cm/3 Cm) m3 0.8000 174,300.00 139,440.00
Strorox - 100 Kg 1.2000 50,400.00 60,480.00
JUMLAH HARGA BAHAN 780,640.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 105,000.00 6,300.00
Tukang L.02 OH 0.0300 150,000.00 4,500.00
Kepala tukang L.03 OH 0.0030 175,000.00 525.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 11,850.00
B BAHAN
Waterstop lebar 150 mm m 1.0500 96,300.00 101,115.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 105,000.00 7,350.00
Tukang L.02 OH 0.0350 150,000.00 5,250.00
Kepala tukang L.03 OH 0.0040 175,000.00 700.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 14,525.00
B BAHAN
Waterstop lebar 200 mm m 1.0500 125,900.00 132,195.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 105,000.00 8,400.00
Tukang L.02 OH 0.0400 150,000.00 6,000.00
Kepala tukang L.03 OH 0.0040 175,000.00 700.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 15,800.00
B BAHAN
Waterstop lebar 230 mm - 320 mm m 1.0500 135,000.00 141,750.00
JENIS PEKERJAAN : A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
SATUAN : Kg
HARGA SATUAN : Rp 147,268.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 105,000.00 7,350.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 19,775.00
B BAHAN
Besi beton Kg 10.5000 10,600.00 111,300.00
Kawat beton Kg 0.1500 18,700.00 2,805.00
JUMLAH HARGA BAHAN 114,105.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 105,000.00 5,250.00
Tukang L.02 OH 0.0500 150,000.00 7,500.00
Kepala tukang L.03 OH 0.0050 175,000.00 875.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 14,150.00
B BAHAN
Besi beton (polos/ulir) Kg 10.5000 10,600.00 111,300.00
Kawat beton Kg 0.1000 18,700.00 1,870.00
JUMLAH HARGA BAHAN 113,170.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 105,000.00 2,625.00
Tukang besi L.02 OH 0.0250 150,000.00 3,750.00
Kepala tukang L.03 OH 0.0250 175,000.00 4,375.00
Mandor L.04 OH 0.0010 175,000.00 175.00
JUMLAH TENAGA KERJA 10,925.00
B BAHAN
Jaring kawat baja di las Kg 10.2000 Err:509 Err:509
Kawat beton Kg 0.0500 18,700.00 935.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.5200 105,000.00 54,600.00
Tukang L.02 OH 0.2600 150,000.00 39,000.00
Kepala tukang L.03 OH 0.0260 175,000.00 4,550.00
Mandor L.04 OH 0.0260 175,000.00 4,550.00
JUMLAH TENAGA KERJA 102,700.00
B BAHAN
Kayu kelas III m3 0.0400 2,582,700.00 103,308.00
Paku 5 - 10 Cm Kg 0.3000 18,600.00 5,580.00
Minyak bekisting Liter 0.1000 13,800.00 1,380.00
JUMLAH HARGA BAHAN 110,268.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 105,000.00 54,600.00
Tukang L.02 OH 0.2600 150,000.00 39,000.00
Kepala tukang L.03 OH 0.0260 175,000.00 4,550.00
Mandor L.04 OH 0.0260 175,000.00 4,550.00
JUMLAH TENAGA KERJA 102,700.00
B BAHAN
Kayu kelas III m3 0.0450 2,582,700.00 116,221.50
Paku 5 - 10 Cm Kg 0.3000 18,600.00 5,580.00
Minyak bekisting Liter 0.1000 13,800.00 1,380.00
JUMLAH HARGA BAHAN 123,181.50
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 105,000.00 69,300.00
Tukang L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 175,000.00 5,775.00
Mandor L.04 OH 0.0330 175,000.00 5,775.00
JUMLAH TENAGA KERJA 130,350.00
B BAHAN
Kayu kelas III m3 0.0400 2,582,700.00 103,308.00
Paku 5 - 10 Cm Kg 0.4000 18,600.00 7,440.00
Minyak bekisting Liter 0.2000 13,800.00 2,760.00
Balok kayu kelas II m3 0.0150 3,029,100.00 45,436.50
Plywod tebal 9 mm Lbr 0.3500 183,400.00 64,190.00
Dolken kayu φ 8-10 Cm Batang 2.0000 34,100.00 68,200.00
JUMLAH HARGA BAHAN 291,334.50
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 105,000.00 69,300.00
Tukang L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 175,000.00 5,775.00
Mandor L.04 OH 0.0330 175,000.00 5,775.00
JUMLAH TENAGA KERJA 130,350.00
B BAHAN
Kayu kelas III m3 0.0400 2,582,700.00 103,308.00
Paku 5 - 10 Cm Kg 0.4000 18,600.00 7,440.00
Minyak bekisting Liter 0.2000 13,800.00 2,760.00
Balok kayu kelas II m3 0.0180 3,029,100.00 54,523.80
Plywod tebal 9 mm Lbr 0.3500 183,400.00 64,190.00
Dolken kayu φ 8-10 Cm Batang 2.0000 34,100.00 68,200.00
JUMLAH HARGA BAHAN 300,421.80
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 105,000.00 69,300.00
Tukang L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 175,000.00 5,775.00
Mandor L.04 OH 0.0330 175,000.00 5,775.00
JUMLAH TENAGA KERJA 130,350.00
B BAHAN
Kayu kelas III m3 0.0400 2,582,700.00 103,308.00
Paku 5 - 10 Cm Kg 0.4000 18,600.00 7,440.00
Minyak bekisting Liter 0.2000 13,800.00 2,760.00
Balok kayu kelas II m3 0.0150 3,029,100.00 45,436.50
Plywod tebal 9 mm Lbr 0.3500 183,400.00 64,190.00
Dolken kayu φ 8-10 Batang -
JUMLAH HARGA BAHAN 223,134.50
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 105,000.00 69,300.00
Tukang L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 175,000.00 5,775.00
Mandor L.04 OH 0.0330 175,000.00 5,775.00
JUMLAH TENAGA KERJA 130,350.00
B BAHAN
Kayu kelas III m3 0.0300 2,582,700.00 77,481.00
Paku 5 - 10 Cm Kg 0.4000 18,600.00 7,440.00
Minyak bekisting Liter 0.2000 13,800.00 2,760.00
Balok kayu kelas II m3 0.0200 3,029,100.00 60,582.00
Plywod tebal 9 mm Lbr 0.3500 183,400.00 64,190.00
Dolken kayu φ 8-10 Cm Batang 3.0000 - -
Penjaga jarak bekising/Spacer Bh 4.0000 19,500.00 78,000.00
JUMLAH HARGA BAHAN 290,453.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 105,000.00 69,300.00
Tukang L.02 OH 0.3300 150,000.00 49,500.00
Kepala tukang L.03 OH 0.0330 175,000.00 5,775.00
Mandor L.04 OH 0.0330 175,000.00 5,775.00
JUMLAH TENAGA KERJA 130,350.00
B BAHAN
Kayu kelas III m3 0.0300 2,582,700.00 77,481.00
Paku 5 - 10 Cm Kg 0.4000 18,600.00 7,440.00
Minyak bekisting Liter 0.1500 13,800.00 2,070.00
Balok kayu kelas II m3 0.0150 3,029,100.00 45,436.50
Plywod tebal 9 mm Lbr 0.3500 183,400.00 64,190.00
Dolken kayu φ 8-10 Cm Batang 2.0000 - -
JUMLAH HARGA BAHAN 196,617.50
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.0500 150,000.00 7,500.00
Kepala tukang L.03 OH 0.0050 175,000.00 875.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 25,525.00
B BAHAN
Kayu kelas III (papan) m3 0.0264 2,582,700.00 68,183.28
Paku 5 - 10 Cm Kg 0.6000 18,600.00 11,160.00
Dolken kayu φ 8-10 Cm Batang 0.5000 - -
JUMLAH HARGA BAHAN 79,343.28
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 4,351,164.40
A TENAGA
Pekerja L.01 OH 5.3000 105,000.00 556,500.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Tukang kayu L.02 OH 1.3000 150,000.00 195,000.00
Tukang besi L.02 OH 1.0500 150,000.00 157,500.00
Kepala tukang L.03 OH 0.2620 175,000.00 45,850.00
Mandor L.04 OH 0.2650 175,000.00 46,375.00
JUMLAH TENAGA KERJA 1,042,475.00
B BAHAN
Kayu kelas III m3 0.2000 2,582,700.00 516,540.00
Paku 5 - 12 Cm Kg 1.5000 18,600.00 27,900.00
Minyak bekisting Liter 0.4000 13,800.00 5,520.00
Besi beton polos Kg 157.5000 10,600.00 1,669,500.00
Kawat beton Kg 2.2500 18,700.00 42,075.00
Semen Portland Kg 336.0000 1,240.00 416,640.00
Pasir beton m3 0.5400 176,500.00 95,310.00
Kerikil m3 0.8100 172,400.00 139,644.00
JUMLAH HARGA BAHAN 2,913,129.00
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 5,347,158.30
A TENAGA
Pekerja L.01 OH 5.6500 105,000.00 593,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Tukang kayu L.02 OH 1.5600 150,000.00 234,000.00
Tukang besi L.02 OH 1.4000 150,000.00 210,000.00
Kepala tukang L.03 OH 0.3230 175,000.00 56,525.00
Mandor L.04 OH 0.2830 175,000.00 49,525.00
JUMLAH TENAGA KERJA 1,184,550.00
B BAHAN
Kayu kelas III m3 0.2700 2,582,700.00 697,329.00
Paku 5 - 12 Cm Kg 2.0000 18,600.00 37,200.00
Minyak bekisting Liter 0.6000 13,800.00 8,280.00
Besi beton polos Kg 210.0000 10,600.00 2,226,000.00
Kawat beton Kg 3.0000 18,700.00 56,100.00
Semen Portland Kg 336.0000 1,240.00 416,640.00
Pasir beton m3 0.5400 176,500.00 95,310.00
Kerikil m3 0.8100 172,400.00 139,644.00
JUMLAH HARGA BAHAN 3,676,503.00
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 8,411,247.90
A TENAGA
Pekerja L.01 OH 7.0500 105,000.00 740,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Tukang kayu L.02 OH 1.6500 150,000.00 247,500.00
Tukang besi L.02 OH 2.1000 150,000.00 315,000.00
Kepala tukang L.03 OH 0.4030 175,000.00 70,525.00
Mandor L.04 OH 0.3530 175,000.00 61,775.00
JUMLAH TENAGA KERJA 1,476,300.00
B BAHAN
Kayu kelas III m3 0.4000 2,582,700.00 1,033,080.00
Paku 5 - 12 Cm Kg 4.0000 18,600.00 74,400.00
Minyak bekisting Liter 2.0000 13,800.00 27,600.00
Besi beton polos Kg 315.0000 10,600.00 3,339,000.00
Kawat beton Kg 4.5000 18,700.00 84,150.00
Semen Portland Kg 336.0000 1,240.00 416,640.00
Pasir beton m3 0.5400 176,500.00 95,310.00
Kerikil m3 0.8100 172,400.00 139,644.00
Kayu Kelas II balok m3 0.1500 3,029,100.00 454,365.00
Plywood 9 mm Lbr 3.5000 144,600.00 506,100.00
Dolken kayu φ (8-10) Cm, panj 4 m Batang 20.0000 - -
JUMLAH HARGA BAHAN 6,170,289.00
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 6,545,150.70
A TENAGA
Pekerja L.01 OH 6.3500 105,000.00 666,750.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Tukang kayu L.02 OH 1.6500 150,000.00 247,500.00
Tukang besi L.02 OH 1.4000 150,000.00 210,000.00
Kepala tukang L.03 OH 0.3330 175,000.00 58,275.00
Mandor L.04 OH 0.3180 175,000.00 55,650.00
JUMLAH TENAGA KERJA 1,279,425.00
B BAHAN
Kayu kelas III m3 0.3200 2,582,700.00 826,464.00
Paku 5 - 12 Cm Kg 3.2000 18,600.00 59,520.00
Minyak bekisting Liter 1.6000 13,800.00 22,080.00
Besi beton polos Kg 210.0000 10,600.00 2,226,000.00
Kawat beton Kg 3.0000 18,700.00 56,100.00
Semen Portland Kg 336.0000 1,240.00 416,640.00
Pasir beton m3 0.5400 176,500.00 95,310.00
Kerikil m3 0.8100 172,400.00 139,644.00
Kayu Kelas II balok m3 0.1400 3,029,100.00 424,074.00
Plywood 9 mm Lbr 2.8000 144,600.00 404,880.00
Dolken kayu φ (8-10) Cm, panj 4 m Batang 16.0000 - -
JUMLAH HARGA BAHAN 4,670,712.00
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.32 Membuat 1 m3 balok beton bertulang (150 kg besi + bekisting)
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 5,590,865.50
A TENAGA
Pekerja L.01 OH 5.3000 105,000.00 556,500.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Tukang kayu L.02 OH 1.3000 150,000.00 195,000.00
Tukang besi L.02 OH 1.0500 150,000.00 157,500.00
Kepala tukang L.03 OH 0.2650 175,000.00 46,375.00
Mandor L.04 OH 0.2650 175,000.00 46,375.00
JUMLAH TENAGA KERJA 1,043,000.00
B BAHAN
Kayu kelas III m3 0.3200 2,582,700.00 826,464.00
Paku 5 - 12 Cm Kg 3.2000 18,600.00 59,520.00
Minyak bekisting Liter 1.6000 13,800.00 22,080.00
Besi beton polos Kg 157.5000 10,600.00 1,669,500.00
Kawa beton Kg 2.2500 18,700.00 42,075.00
Semen Portland Kg 336.0000 1,240.00 416,640.00
Pasir beton m3 0.5400 176,500.00 95,310.00
Kerikil m3 0.8100 172,400.00 139,644.00
Kayu Kelas II balok m3 0.1200 3,029,100.00 363,492.00
Plywood 9 mm Lbr 2.8000 144,600.00 404,880.00
Dolken kayu φ (8-10) Cm, panj 4 m Batang 32.0000 - -
JUMLAH HARGA BAHAN 4,039,605.00
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 5,496,290.80
A TENAGA
Pekerja L.01 OH 5.3000 105,000.00 556,500.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Tukang kayu L.02 OH 1.3000 150,000.00 195,000.00
Tukang besi L.02 OH 1.0500 150,000.00 157,500.00
Kepala tukang L.03 OH 0.2620 175,000.00 45,850.00
Mandor L.04 OH 0.2650 175,000.00 46,375.00
JUMLAH TENAGA KERJA 1,042,475.00
B BAHAN
Kayu kelas III m3 0.2400 2,582,700.00 619,848.00
Paku 5 - 12 Cm Kg 3.2000 18,600.00 59,520.00
Minyak bekisting Liter 1.6000 13,800.00 22,080.00
Besi beton polos Kg 157.5000 10,600.00 1,669,500.00
Kawa beton Kg 2.2500 18,700.00 42,075.00
Semen Portland Kg 336.0000 1,240.00 416,640.00
Pasir beton m3 0.5400 176,500.00 95,310.00
Kerikil m3 0.8100 172,400.00 139,644.00
Kayu Kelas II balok m3 0.1600 3,029,100.00 484,656.00
Plywood 9 mm Lbr 2.8000 144,600.00 404,880.00
Dolken kayu φ (8-10) Cm, panj 4 m Batang 24.0000 - -
JUMLAH HARGA BAHAN 3,954,153.00
C PERALATAN
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 4,996,628.00
E Overhead & profit 10% x Jumlah 499,662.80
F Harga Satuan Pekerjaan (D+E) 5,496,290.80
JENIS PEKERJAAN : A.4.1.1.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 6,067,417.95
A TENAGA
Pekerja L.01 OH 5.6500 105,000.00 593,250.00
Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
Tukang kayu L.02 OH 1.5600 150,000.00 234,000.00
Tukang besi L.02 OH 1.4000 150,000.00 210,000.00
Kepala tukang L.03 OH 0.3230 175,000.00 56,525.00
Mandor L.04 OH 0.2830 175,000.00 49,525.00
JUMLAH TENAGA KERJA 1,184,550.00
B BAHAN
Kayu kelas III m3 0.2500 2,582,700.00 645,675.00
Paku 5 - 12 Cm Kg 3.0000 18,600.00 55,800.00
Minyak bekisting Liter 1.2000 13,800.00 16,560.00
Besi beton polos Kg 210.0000 10,600.00 2,226,000.00
Kawa beton Kg 3.0000 18,700.00 56,100.00
Semen Portland Kg 336.0000 1,240.00 416,640.00
Pasir beton m3 0.5400 176,500.00 95,310.00
Kerikil m3 0.8100 172,400.00 139,644.00
Kayu Kelas II balok m3 0.1050 3,029,100.00 318,055.50
Plywood 9 mm Lbr 2.5000 144,600.00 361,500.00
Dolken kayu φ (8-10) Cm, panj 4 m Batang 14.0000 - -
JUMLAH HARGA BAHAN 4,331,284.50
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.35 Membuat 1 m kolom praktis beton bertulang (11 x 11) Cm
SATUAN : M'
HARGA SATUAN PEKERJAAN : Rp 109,972.94
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1800 105,000.00 18,900.00
Tukang Batu L.02 OH 0.0200 150,000.00 3,000.00
Tukang kayu L.02 OH 0.0200 150,000.00 3,000.00
Tukang besi L.02 OH 0.0200 150,000.00 3,000.00
Kepala tukang L.03 OH 0.0060 175,000.00 1,050.00
Mandor L.04 OH 0.0090 175,000.00 1,575.00
JUMLAH TENAGA KERJA 30,525.00
B BAHAN
Kayu kelas III m3 0.0020 2,582,700.00 5,165.40
Paku 5 - 12 Cm Kg 0.0100 18,600.00 186.00
Minyak bekisting Liter 1.2000 13,800.00 16,560.00
Besi beton polos Kg 3.0000 10,600.00 31,800.00
Kawat beton Kg 0.4500 18,700.00 8,415.00
Semen Portland Kg 4.0000 1,240.00 4,960.00
Pasir beton m3 0.0060 176,500.00 1,059.00
Kerikil m3 0.0090 145,000.00 1,305.00
JUMLAH HARGA BAHAN 69,450.40
C PERALATAN
JENIS PEKERJAAN : A.4.1.1.36 Membuat 1 m ring balok beton bertulang (10 x 15) Cm
SATUAN : M'
HARGA SATUAN PEKERJAAN : Rp 134,209.46
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2970 105,000.00 31,185.00
Tukang Batu L.02 OH 0.0330 150,000.00 4,950.00
Tukang kayu L.02 OH 0.0330 150,000.00 4,950.00
Tukang besi L.02 OH 0.0330 150,000.00 4,950.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,410.00
B BAHAN
Kayu kelas III m3 0.0030 2,582,700.00 7,748.10
Paku 5 - 12 Cm Kg 0.0200 18,600.00 372.00
Minyak bekisting Liter 1.0000 13,800.00 13,800.00
Besi beton polos Kg 3.6000 10,600.00 38,160.00
Kawat beton Kg 0.0500 18,700.00 935.00
Semen Portland Kg 5.5000 1,240.00 6,820.00
Pasir beton m3 0.0090 176,500.00 1,588.50
Kerikil m3 0.0150 145,000.00 2,175.00
JUMLAH HARGA BAHAN 71,598.60
C PERALATAN
JENIS PEKERJAAN : A.4.1.2.1 Membuat 1 m2 lahan produksi tebal 8 Cm beton f'c = 14,5 Mpa (K 175), slump (12 ± 2) Cm
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 74,681.68
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1320 105,000.00 13,860.00
Tukang Batu L.02 OH 0.0220 150,000.00 3,300.00
Kepala tukang L.03 OH 0.0020 175,000.00 350.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 18,735.00
B BAHAN
Semen Portland Kg 26.0800 1,240.00 32,339.20
Pasir beton Kg 60.8000 126.07 7,665.14
Kerikil (Maks 30 mm) Kg 82.3200 107.41 8,841.78
Air Liter 17.2000 18.10 311.32
JUMLAH HARGA BAHAN 49,157.44
C PERALATAN
JENIS PEKERJAAN : A.4.1.2.2 Membuat 1 m2 lahan produksi tebal 10 Cm beton f'c = 14,5 Mpa (K 175), slump (12 ± 2) Cm
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 93,386.48
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1650 105,000.00 17,325.00
Tukang Batu L.02 OH 0.0280 150,000.00 4,200.00
Kepala tukang L.03 OH 0.0030 175,000.00 525.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 23,450.00
B BAHAN
Semen Portland Kg 32.6000 1,240.00 40,424.00
Pasir beton Kg 76.0000 126.07 9,581.43
Kerikil (Maks 30 mm) Kg 102.9000 107.41 11,052.22
Air Liter 21.5000 18.10 389.15
JUMLAH HARGA BAHAN 61,446.80
C PERALATAN
JENIS PEKERJAAN : A.4.1.2.3 Membuat 1 m2 lahan produksi tebal 12 Cm beton f'c = 14,5 Mpa (K 175), slump (12 ± 2) Cm
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 111,926.28
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1980 105,000.00 20,790.00
Tukang Batu L.02 OH 0.0330 150,000.00 4,950.00
Kepala tukang L.03 OH 0.0030 175,000.00 525.00
Mandor L.04 OH 0.0100 175,000.00 1,750.00
JUMLAH TENAGA KERJA 28,015.00
B BAHAN
Semen Portland Kg 39.1200 1,240.00 48,508.80
Pasir beton Kg 91.2000 126.07 11,497.71
Kerikil (Maks 30 mm) Kg 123.4800 107.41 13,262.67
Air Liter 25.8000 18.10 466.98
JUMLAH HARGA BAHAN 73,736.16
C PERALATAN
JENIS PEKERJAAN : A.4.1.2.4 Membuat 1 m2 lahan produksi tebal 15 Cm beton f'c = 14,5 Mpa (K 175), slump (12 ± 2) Cm
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 140,068.72
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2480 105,000.00 26,040.00
Tukang Batu L.02 OH 0.0410 150,000.00 6,150.00
Kepala tukang L.03 OH 0.0040 175,000.00 700.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 35,165.00
B BAHAN
Semen Portland Kg 48.9000 1,240.00 60,636.00
Pasir beton Kg 114.0000 126.07 14,372.14
Kerikil (Maks 30 mm) Kg 154.3500 107.41 16,578.33
Air Liter 32.2500 18.10 583.73
JUMLAH HARGA BAHAN 92,170.20
C PERALATAN
JENIS PEKERJAAN : A.4.1.2.5 Membuat 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai )
SATUAN : M2
HARGA SATUAN PEKERJAAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0070 105,000.00 735.00
Tukang Batu L.02 OH 0.0760 150,000.00 11,400.00
Kepala tukang L.03 OH 0.0080 175,000.00 1,400.00
Mandor L.04 OH 0.0010 175,000.00 175.00
JUMLAH TENAGA KERJA 13,710.00
B BAHAN
Lantai kerja tebal 10 Cm m3 0.0800 957,798.73 76,623.90
Besi hollow 50.50.3 Kg 9.3940 Err:509 Err:509
Kayu kaso 5/7 m3 0.0050 1,962,100.00 9,810.50
Phenol film 12 mm Lbr 0.0800 215,000.00 17,200.00
Minyak bekisting L 0.2000 13,800.00 2,760.00
Dinabolt dia 12 mm (10-15 Cm) Bh 3.8820 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
JENIS PEKERJAAN : A.4.1.2.6 Membuat 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai )
SATUAN : M2
HARGA SATUAN PEKERJAAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0040 105,000.00 420.00
Tukang Batu L.02 OH 0.0380 150,000.00 5,700.00
Kepala tukang L.03 OH 0.0040 175,000.00 700.00
Mandor L.04 OH 0.0010 175,000.00 175.00
JUMLAH TENAGA KERJA 6,995.00
B BAHAN
Kayu kaso 5/7 m3 0.0050 1,962,100.00 9,810.50
Phenol film 12 mm Lbr 0.0430 215,000.00 9,245.00
Minyak bekisting L 0.2000 13,800.00 2,760.00
Paku (5 s.d. 7) cm kg 0.0460 18,600.00 855.60
Dinabolt dia 12 mm (10-15 Cm) Bh 0.6930 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
JENIS PEKERJAAN : A.4.1.2.7 Membuat 1 m2 bekisting untuk kolom beton pracetak ( 10-12 kali pakai )
SATUAN : M2
HARGA SATUAN PEKERJAAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0040 105,000.00 420.00
Tukang Batu L.02 OH 0.0380 150,000.00 5,700.00
Kepala tukang L.03 OH 0.0040 175,000.00 700.00
Mandor L.04 OH 0.0010 175,000.00 175.00
JUMLAH TENAGA KERJA 6,995.00
B BAHAN
Kayu kaso 5/7 m3 0.0040 1,962,100.00 7,848.40
Phenol film 12 mm Lbr 0.0480 215,000.00 10,320.00
Minyak bekisting L 0.2000 13,800.00 2,760.00
Paku 5-7 Cm Kg 0.0460 18,600.00 855.60
Dinabolt dia 12 mm (10-15 Cm) Bh 0.6930 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
JENIS PEKERJAAN : A.4.1.2.8 Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
SATUAN : Bh
HARGA SATUAN PEKERJAAN : Rp 10,054.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0530 105,000.00 5,565.00
Tukang kayu L.02 OH 0.0180 150,000.00 2,700.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 9,140.00
B BAHAN
JENIS PEKERJAAN : A.4.1.2.9 Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
SATUAN : Bh
HARGA SATUAN PEKERJAAN : Rp 16,192.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0890 105,000.00 9,345.00
Tukang kayu L.02 OH 0.0300 150,000.00 4,500.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 14,720.00
B BAHAN
JENIS PEKERJAAN : A.4.1.2.10 Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
SATUAN : Bh
HARGA SATUAN PEKERJAAN : Rp 13,123.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0710 105,000.00 7,455.00
Tukang kayu L.02 OH 0.0240 150,000.00 3,600.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 11,930.00
B BAHAN
JENIS PEKERJAAN : A.4.1.2.11 Penuangan/menebar beton untuk 1 buah komponen plat pracetak
SATUAN : Bh
HARGA SATUAN PEKERJAAN : Rp 89,369.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0640 105,000.00 6,720.00
Tukang batu L.02 OH 0.2440 150,000.00 36,600.00
Tukang vibrator L.02 OH 0.1280 150,000.00 19,200.00
Kepala tukang L.03 OH 0.0340 175,000.00 5,950.00
Mandor L.04 OH 0.0730 175,000.00 12,775.00
JUMLAH TENAGA KERJA 81,245.00
B BAHAN
JENIS PEKERJAAN : A.4.1.2.12 Penuangan/menebar beton untuk 1 buah komponen balok pracetak
SATUAN : Bh
HARGA SATUAN PEKERJAAN : Rp 91,844.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0690 105,000.00 7,245.00
Tukang batu L.02 OH 0.2420 150,000.00 36,300.00
Tukang vibrator L.02 OH 0.1380 150,000.00 20,700.00
Kepala tukang L.03 OH 0.0370 175,000.00 6,475.00
Mandor L.04 OH 0.0730 175,000.00 12,775.00
JUMLAH TENAGA KERJA 83,495.00
B BAHAN
JENIS PEKERJAAN : A.4.1.2.13 Penuangan/menebar beton untuk 1 buah komponen kolom pracetak
SATUAN : Bh
HARGA SATUAN PEKERJAAN : Rp 82,725.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0610 105,000.00 6,405.00
Tukang batu L.02 OH 0.2130 150,000.00 31,950.00
Tukang vibrator L.02 OH 0.1220 150,000.00 18,300.00
Kepala tukang L.03 OH 0.0330 175,000.00 5,775.00
Mandor L.04 OH 0.0730 175,000.00 12,775.00
JUMLAH TENAGA KERJA 75,205.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Operator Crane L.08 OH 0.0670 180,000.00 12,060.00
Pembantu Operator Crane L.09 OH 0.0670 105,000.00 7,035.00
Pekerja L.01 OH 0.0670 105,000.00 7,035.00
Tukang batu L.02 OH 0.0670 150,000.00 10,050.00
Tukang ereksi L.02 OH 0.1340 150,000.00 20,100.00
Kepala tukang L.03 OH 0.0670 175,000.00 11,725.00
Mandor L.04 OH 0.0670 175,000.00 11,725.00
JUMLAH TENAGA KERJA 79,730.00
B BAHAN
Solar L 6.6760 11,600.00 77,441.60
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0610 105,000.00 6,405.00
Tukang batu L.02 OH 0.0610 150,000.00 9,150.00
Tukang ereksi L.02 OH 0.1220 150,000.00 18,300.00
Operator crane L.08 OH 0.0610 180,000.00 10,980.00
Pembantu operator crane L.09 OH 0.0610 105,000.00 6,405.00
Kepala tukang L.03 OH 0.0610 175,000.00 10,675.00
Mandor L.04 OH 0.0610 175,000.00 10,675.00
JUMLAH TENAGA KERJA 72,590.00
B BAHAN
Solar L 6.1100 11,600.00 70,876.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0830 105,000.00 8,715.00
Tukang batu L.02 OH 0.0830 150,000.00 12,450.00
Tukang erection L.02 OH 0.1660 150,000.00 24,900.00
Operator crane L.08 OH 0.0830 180,000.00 14,940.00
Pembantu operator crane L.09 OH 0.0830 105,000.00 8,715.00
Kepala tukang L.03 OH 0.0830 175,000.00 14,525.00
Mandor L.04 OH 0.0830 175,000.00 14,525.00
JUMLAH TENAGA KERJA 98,770.00
B BAHAN
Solar L 8.2770 11,600.00 96,013.20
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0190 105,000.00 1,995.00
Tukang batu L.02 OH 0.0380 150,000.00 5,700.00
Operator crane L.08 OH 0.0190 180,000.00 3,420.00
Pembantu operator crane L.09 OH 0.0190 105,000.00 1,995.00
JUMLAH TENAGA KERJA 13,110.00
B BAHAN
Solar L 1.8970 11,600.00 22,005.20
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0190 105,000.00 1,995.00
Tukang batu L.02 OH 0.0380 150,000.00 5,700.00
Operator crane L.08 OH 0.0190 180,000.00 3,420.00
Pembantu operator crane L.09 OH 0.0190 105,000.00 1,995.00
JUMLAH TENAGA KERJA 13,110.00
B BAHAN
Solar L 1.8970 11,600.00 22,005.20
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0190 105,000.00 1,995.00
Tukang batu L.02 OH 0.0380 150,000.00 5,700.00
Operator crane L.08 OH 0.0190 180,000.00 3,420.00
Pembantu operator crane L.09 OH 0.0190 105,000.00 1,995.00
JUMLAH TENAGA KERJA 13,110.00
B BAHAN
Solar L 1.8970 11,600.00 22,005.20
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
JUMLAH TENAGA KERJA -
B BAHAN
Semen grount Kg 1850.0000 1,240.00 2,294,000.00
Air L 400.0000 18.10 7,240.00
JUMLAH HARGA BAHAN 2,301,240.00
C PERALATAN
JENIS PEKERJAAN : A.4.1.2.22 Upah melakukan 1 titik grouting pada join pracetak
SATUAN : Titik
HARGA SATUAN PEKERJAAN : Rp 81,922.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Tukang batu L.02 OH 0.3670 150,000.00 55,050.00
Kepala tukang L.03 OH 0.0740 175,000.00 12,950.00
Mandor L.04 OH 0.0370 175,000.00 6,475.00
JUMLAH TENAGA KERJA 74,475.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1470 105,000.00 15,435.00
Tukang kayu L.02 OH 0.1470 150,000.00 22,050.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 40,985.00
B BAHAN
Kayu kaso 5/7 m3 0.0120 2,446,500.00 29,358.00
Papan cor m3 0.0040 2,582,700.00 10,330.80
Paku 5-7 Cm Kg 0.2640 18,600.00 4,910.40
JUMLAH HARGA BAHAN 44,599.20
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2200 105,000.00 23,100.00
Tukang besi L.02 OH 0.2200 150,000.00 33,000.00
Tukang kayu L.02 OH 0.0220 150,000.00 3,300.00
Mandor L.04 OH 0.0110 175,000.00 1,925.00
JUMLAH TENAGA KERJA 61,325.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 105,000.00 6,300.00
Tukang Las konstruksi L.02 OH 0.0600 150,000.00 9,000.00
Kepala tukang L.03 OH 0.0060 175,000.00 1,050.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 16,875.00
B BAHAN
Besi profil Kg 1.1500 24,000.00 27,600.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 105,000.00 6,300.00
Tukang Las konstruksi L.02 OH 0.0600 150,000.00 9,000.00
Kepala tukang L.03 OH 0.0060 175,000.00 1,050.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 16,875.00
B BAHAN
Besi baja IWF Kg 1.1500 Err:509 Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang besi konstruksi L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0010 175,000.00 175.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 26,550.00
B BAHAN
Solar L 1.0000 11,600.00 11,600.00
Minyak pelumas L 0.1000 38,700.00 3,870.00
JUMLAH HARGA BAHAN 15,470.00
C PERALATAN
Sewa alat Jam 0.8000 17,857.14 14,285.71
JUMLAH HARGA ALAT 14,285.71
D JUMLAH (A+B+C) 56,305.71
E Overhead & profit 10% x Jumlah 5,630.57
F Harga Satuan Pekerjaan (D+E) 61,936.29
JENIS PEKERJAAN : A.4.2.1.4 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
SATUAN : M2
HARGA SATUAN PEKERJAAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0500 105,000.00 110,250.00
Tukang Las L.02 OH 1.0500 150,000.00 157,500.00
Kepala tukang L.03 OH 0.1050 175,000.00 18,375.00
Mandor L.04 OH 0.0520 175,000.00 9,100.00
JUMLAH TENAGA KERJA 295,225.00
B BAHAN
Besi siku L 30.30.3 Kg 15.0000 Err:509 Err:509
Besi plat baja Kg 32.8000 a #VALUE!
Kawat las Kg 0.0500 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 105,000.00 4,200.00
Tukang besi L.02 OH 0.0200 150,000.00 3,000.00
Kepala tukang L.03 OH 0.0020 175,000.00 350.00
Mandor L.04 OH 0.0020 175,000.00 350.00
JUMLAH TENAGA KERJA 7,900.00
B BAHAN
Kawat las listrik Kg 0.4000 Err:509 Err:509
Solar L 0.3000 11,600.00 3,480.00
Minyak pelumas L 0.0400 38,700.00 1,548.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
Sewa alat Jam 0.1700 17,857.14 3,035.71
JUMLAH HARGA ALAT 3,035.71
D JUMLAH (A+B+C) Err:509
E Overhead & profit 10% x Jumlah Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6500 105,000.00 68,250.00
Tukang las L.02 OH 0.6500 150,000.00 97,500.00
Kepala tukang L.03 OH 0.0650 175,000.00 11,375.00
Mandor L.04 OH 0.0320 175,000.00 5,600.00
JUMLAH TENAGA KERJA 182,725.00
B BAHAN
Besi scuare tube m 4.7600 a #VALUE!
Besi lis kaca (1 x 1) Cm m 4.5220 a #VALUE!
Pengelasan Cm 20.0000 Err:509 Err:509
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 105,000.00 126,000.00
Tukang las L.02 OH 1.2000 150,000.00 180,000.00
Kepala tukang L.03 OH 0.1200 175,000.00 21,000.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 328,050.00
B BAHAN
Pintu gulung besi m2 1.0000 Err:509 Err:509
JENIS PEKERJAAN : A.4.2.1.8 Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC
SATUAN : M2
HARGA SATUAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4400 105,000.00 46,200.00
Tukang L.02 OH 0.4400 150,000.00 66,000.00
Kepala tukang L.03 OH 0.0440 175,000.00 7,700.00
Mandor L.04 OH 0.0220 175,000.00 3,850.00
JUMLAH TENAGA KERJA 123,750.00
B BAHAN
Pintu lipat m2 1.0000 Err:509 Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 105,000.00 8,400.00
Tukang L.02 OH 0.8000 150,000.00 120,000.00
Kepala tukang L.03 OH 0.0800 175,000.00 14,000.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 143,100.00
B BAHAN
Sunscreen alluminium m2 1.0000 Err:509 Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang L.02 OH 1.0000 150,000.00 150,000.00
Kepala tukang L.03 OH 0.1000 175,000.00 17,500.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 281,250.00
B BAHAN
Folding Gate 0.4mm m2 1.0000 Err:509 Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0430 105,000.00 4,515.00
Tukang L.02 OH 0.0430 150,000.00 6,450.00
Kepala tukang L.03 OH 0.0043 175,000.00 752.50
Mandor L.04 OH 0.0021 175,000.00 367.50
JUMLAH TENAGA KERJA 12,085.00
B BAHAN
Profil alluminium m 1.1000 110,000.00 121,000.00
Skrup fixer bh 2.0000 7,500.00 15,000.00
Sealant Tube 0.0600 35,000.00 2,100.00
JUMLAH HARGA BAHAN 138,100.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0850 105,000.00 8,925.00
Tukang L.02 OH 0.0850 150,000.00 12,750.00
Kepala tukang L.03 OH 0.0085 175,000.00 1,487.50
Mandor L.04 OH 0.0042 175,000.00 735.00
JUMLAH TENAGA KERJA 23,897.50
B BAHAN
Profil alluminium m 4.4000 110,000.00 484,000.00
A TENAGA
Pekerja L.01 OH 0.0850 105,000.00 8,925.00
Tukang L.02 OH 0.0850 150,000.00 12,750.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 24,125.00
B BAHAN
Pintu alluminium m 4.4000 Err:509 Err:509
Profil kaca m 4.5000 Err:509 Err:509
Sealant Tube 0.0600 35,000.00 2,100.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3500 105,000.00 36,750.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 98,525.00
B BAHAN
Venetions blinds dan vertical m2 1.0000 a #VALUE!
blinds (tirai)
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6700 105,000.00 175,350.00
Tukang las L.02 OH 1.6700 150,000.00 250,500.00
Kepala tukang L.03 OH 0.1670 175,000.00 29,225.00
Mandor L.04 OH 0.0830 175,000.00 14,525.00
JUMLAH TENAGA KERJA 469,600.00
B BAHAN
Besi strip kg 6.1770 Err:509 Err:509
Pengelasan Cm 27.0800 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang las L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 28,125.00
B BAHAN
Kawat nyamuk m2 1.1000 Err:509 Err:509
Pengelasan Cm 11.1100 Err:509 Err:509
Baja strip (0,2 x 2) Cm kg 1.7160 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0010 175,000.00 175.00
JUMLAH TENAGA KERJA 54,675.00
B BAHAN
Jendela nako (rangka + kaca 5 mm) m2 1.1000 243,000.00 267,300.00
Paku skrup 1 Cm - 2,5 Cm buah 10.0000 Err:509 Err:509
Baja strip kg 7.0000 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
JENIS PEKERJAAN : A.4.2.1.18 Pemasangan 1 M1 talang datar/ jurai seng bjls 28 lebar 90 Cm
SATUAN : M1
HARGA SATUAN : Rp 114,120.93
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0010 175,000.00 175.00
JUMLAH TENAGA KERJA 54,675.00
B BAHAN
Seng plat m 1.0500 Err:509 Err:509
Paku 1 Cm - 2,5 Cm kg 0.0150 18,600.00 279.00
Papan kayu kelas II atau III m3 0.0190 2,582,700.00 49,071.30
JUMLAH HARGA BAHAN 49,071.30
C PERALATAN
JENIS PEKERJAAN : A.4.2.1.19 Pemasangan 1 m talang 1/2 lingkaran D-15 Cm, seng plat bjls 30 lebar 45 Cm
SATUAN : M1
HARGA SATUAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.3000 150,000.00 45,000.00
Kepala tukang L.03 OH 0.0300 175,000.00 5,250.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 67,400.00
B BAHAN
Seng plat m2 1.0500 Err:509 Err:509
Paku 1 Cm - 2,5 Cm kg 0.0100 18,600.00 186.00
Besi strip kg 0.5000 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
JENIS PEKERJAAN : A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 120 Cm untuk partisi
SATUAN : M2
HARGA SATUAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang besi L.02 OH 0.2500 150,000.00 37,500.00
Kepala tukang L.03 OH 0.0250 175,000.00 4,375.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 70,400.00
B BAHAN
Rangka metal hollow 40.40.2 mm m1 3.5000 Err:509 Err:509
Assesoris (perkuatan, las dll) Ls 1.0000 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
JENIS PEKERJAAN : A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2 mm, modul 60 x 60 Cm, untuk plafon
SATUAN : M2
HARGA SATUAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 105,000.00 36,750.00
Tukang besi L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 98,525.00
B BAHAN
Rangka metal hollow 40.40.2 mm m1 4.0000 Err:509 Err:509
Assesoris (perkuatan, las dll) Ls 1.0000 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.1 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1 batu Camp, 1PC : 2 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 294,599.80
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 105,000.00 63,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0300 175,000.00 5,250.00
JUMLAH TENAGA KERJA 101,750.00
B BAHAN
Bata Merah Bh 140.0000 700.00 98,000.00
Semen Portland Kg 43.5000 1,240.00 53,940.00
Pasir Pasang m3 0.0800 176,600.00 14,128.00
JUMLAH HARGA BAHAN 166,068.00
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.2 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1 batu Camp, 1PC : 3 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 282,346.46
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 105,000.00 63,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0300 175,000.00 5,250.00
JUMLAH TENAGA KERJA 101,750.00
B BAHAN
Bata Merah m3 140.0000 700.00 98,000.00
Semen Portland Kg 32.9500 1,240.00 40,858.00
Pasir Pasang m3 0.0910 176,600.00 16,070.60
JUMLAH HARGA BAHAN 154,928.60
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.3 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1 batu Camp, 1PC : 4 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 274,005.38
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 105,000.00 63,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0300 175,000.00 5,250.00
JUMLAH TENAGA KERJA 101,750.00
B BAHAN
Bata Merah m3 140.0000 700.00 98,000.00
Semen Portland Kg 26.5500 1,240.00 32,922.00
Pasir Pasang m3 0.0930 176,600.00 16,423.80
JUMLAH HARGA BAHAN 147,345.80
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.4 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1 batu Camp, 1PC : 5 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 269,820.32
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 105,000.00 63,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0300 175,000.00 5,250.00
JUMLAH TENAGA KERJA 101,750.00
B BAHAN
Bata Merah m3 140.0000 700.00 98,000.00
Semen Portland Kg 22.2000 1,240.00 27,528.00
Pasir Pasang m3 0.1020 176,600.00 18,013.20
JUMLAH HARGA BAHAN 143,541.20
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.5 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1 batu Camp, 1PC : 6 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 268,658.72
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 105,000.00 63,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0300 175,000.00 5,250.00
JUMLAH TENAGA KERJA 101,750.00
B BAHAN
Bata Merah m3 140.0000 700.00 98,000.00
Semen Portland Kg 18.5000 1,240.00 22,940.00
Pasir Pasang m3 0.1220 176,600.00 21,545.20
JUMLAH HARGA BAHAN 142,485.20
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.6 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1 batu Camp, 1PC : 3Kapur Padam : 10 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 277,458.17
A TENAGA
Pekerja L.01 OH 0.6000 105,000.00 63,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0300 175,000.00 5,250.00
JUMLAH TENAGA KERJA 101,750.00
B BAHAN
Bata Merah buah 140.0000 700.00 98,000.00
Semen Portland Kg 10.0800 1,240.00 12,499.20
kapur M3 0.0275 860,000.00 23,650.00
Pasir Pasang m3 0.0925 176,600.00 16,335.50
JUMLAH HARGA BAHAN 150,484.70
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.7 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 2 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 143,092.18
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Bata Merah m3 70.0000 700.00 49,000.00
Semen Portland Kg 18.9500 1,240.00 23,498.00
Pasir Pasang m3 0.0380 176,600.00 6,710.80
JUMLAH HARGA BAHAN 79,208.80
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.8 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 3 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 137,233.58
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Bata Merah m3 70.0000 700.00 49,000.00
Semen Portland Kg 14.3700 1,240.00 17,818.80
Pasir Pasang m3 0.0400 176,600.00 7,064.00
JUMLAH HARGA BAHAN 73,882.80
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.9 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 133,901.68
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Bata Merah m3 70.0000 700.00 49,000.00
Semen Portland Kg 11.5000 1,240.00 14,260.00
Pasir Pasang m3 0.0430 176,600.00 7,593.80
JUMLAH HARGA BAHAN 70,853.80
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.10 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 5 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 131,807.72
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Bata Merah m3 70.0000 700.00 49,000.00
Semen Portland Kg 9.6800 1,240.00 12,003.20
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN 68,950.20
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.11 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 6 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 130,729.72
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Bata Merah m3 70.0000 700.00 49,000.00
Semen Portland Kg 8.3200 1,240.00 10,316.80
Pasir Pasang m3 0.0490 176,600.00 8,653.40
JUMLAH HARGA BAHAN 67,970.20
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.12 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 8 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 128,441.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Bata Merah m3 70.0000 700.00 49,000.00
Semen Portland Kg 6.5000 1,240.00 8,060.00
Pasir Pasang m3 0.0500 176,600.00 8,830.00
JUMLAH HARGA BAHAN 65,890.00
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.13 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 3Kapur Padam : 10 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 139,903.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Bata Merah m3 70.0000 700.00 49,000.00
Semen Portland Kg 4.5000 1,240.00 5,580.00
kapur m3 0.0150 860,000.00 12,900.00
Pasir Pasang m3 0.0500 176,600.00 8,830.00
JUMLAH HARGA BAHAN 76,310.00
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.14 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1 SP : 1 KP : 1 PP
SATUAN : M2
HARGA SATUAN : Rp 130,411.73
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Bata Merah m3 70.0000 700.00 49,000.00
Semen Portland Kg 0.0180 1,240.00 22.32
kapur m3 0.0180 860,000.00 15,480.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
JUMLAH HARGA BAHAN 67,681.12
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.15 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1 SP: 1KP : 2 PP
SATUAN : M2
HARGA SATUAN : Rp 128,564.88
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Bata Merah m3 70.0000 700.00 49,000.00
Semen Portland Kg 0.0140 1,240.00 17.36
kapur m3 0.0140 860,000.00 12,040.00
Pasir Pasang m3 0.0280 176,600.00 4,944.80
JUMLAH HARGA BAHAN 66,002.16
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.16 Pemasangan 1 m2 dinding conblock Hollow Brick (H.20) Camp, 1PC : 3 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 326,320.06
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 105,000.00 36,750.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 65,025.00
B BAHAN
Hollow Brick (H.20) m3 12.5000 5,000.00 62,500.00
Semen Portland Kg 30.3200 1,240.00 37,596.80
Pasir Pasang m3 0.7280 176,600.00 128,564.80
Besi angker diameter 8 Kg 0.2800 10,600.00 2,968.00
JUMLAH HARGA BAHAN 231,629.60
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.17 Pemasangan 1 m2 dinding conblock Hollow Brick (H.20) Camp, 1PC : 4 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 326,601.66
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 105,000.00 36,750.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 65,025.00
B BAHAN
Hollow Brick (H.20) m3 12.5000 5,000.00 62,500.00
Semen Portland Kg 24.2600 1,240.00 30,082.40
Pasir Pasang m3 0.7720 176,600.00 136,335.20
Besi angker diameter 8 Kg 0.2800 10,600.00 2,968.00
JUMLAH HARGA BAHAN 231,885.60
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.18 Pemasangan 1 m2 dinding conblock Hollow Brick (H.15) Camp, 1PC : 3 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 252,775.16
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3200 105,000.00 33,600.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0160 175,000.00 2,800.00
JUMLAH TENAGA KERJA 56,500.00
B BAHAN
Hollow Brick (H.15) m3 12.5000 3,600.00 45,000.00
Semen Portland Kg 22.7400 1,240.00 28,197.60
Pasir Pasang m3 0.5500 176,600.00 97,130.00
Besi angker diameter 8 Kg 0.2800 10,600.00 2,968.00
JUMLAH HARGA BAHAN 173,295.60
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.19 Pemasangan 1 m2 dinding conblock Hollow Brick (H.15) Camp, 1PC : 4 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 252,798.92
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3200 105,000.00 33,600.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0160 175,000.00 2,800.00
JUMLAH TENAGA KERJA 56,500.00
B BAHAN
Hollow Brick (H.15) m3 12.5000 3,600.00 45,000.00
Semen Portland Kg 18.2000 1,240.00 22,568.00
Pasir Pasang m3 0.5820 176,600.00 102,781.20
Besi angker diameter 8 Kg 0.2800 10,600.00 2,968.00
JUMLAH HARGA BAHAN 173,317.20
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.20 Pemasangan 1 m2 dinding conblock Hollow Brick (H.10) Camp, 1PC : 3 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 195,991.18
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Hollow Brick (H.10) m3 12.5000 3,300.00 41,250.00
Semen Portland Kg 15.1600 1,240.00 18,798.40
Pasir Pasang m3 0.3640 176,600.00 64,282.40
Besi angker diameter 8 Kg 0.2800 10,600.00 2,968.00
JUMLAH HARGA BAHAN 127,298.80
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Hollow Brick (H.10) m3 12.5000 3,300.00 41,250.00
Semen Portland Kg 12.1300 1,240.00 15,041.20
Pasir Pasang m3 0.3880 176,600.00 68,520.80
Besi angker diameter 8 Kg 0.2800 10,600.00 2,968.00
JUMLAH HARGA BAHAN 127,780.00
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 Camp, 1PC : 3 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 417,665.60
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Rooster 20x20 m3 30.0000 10,300.00 309,000.00
Semen Portland Kg 11.0000 1,240.00 13,640.00
Pasir Pasang m3 0.0350 176,600.00 6,181.00
JUMLAH HARGA BAHAN 328,821.00
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.23 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 Camp, 1PC : 4 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 417,665.60
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Bata Berongga m3 30.0000 10,300.00 309,000.00
Semen Portland Kg 11.0000 1,240.00 13,640.00
Pasir Pasang m3 0.0350 176,600.00 6,181.00
JUMLAH HARGA BAHAN 328,821.00
C PERALATAN
JENIS PEKERJAAN : A.4.4.1.24 Pemasangan 1 m2 dinding bata berongga 12x11x24 Camp, 1PC : 3 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 883,587.32
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 59,250.00
B BAHAN
Bata Rooster m3 70.0000 10,300.00 721,000.00
Semen Portland Kg 14.0000 1,240.00 17,360.00
Pasir Pasang m3 0.0320 176,600.00 5,651.20
JUMLAH HARGA BAHAN 744,011.20
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 59,250.00
B BAHAN
Semen Portland Kg 15.5040 1,240.00 19,224.96
Pasir Pasang m3 0.0160 176,600.00 2,825.60
JUMLAH HARGA BAHAN 22,050.56
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 59,250.00
B BAHAN
Semen Portland Kg 10.2240 1,240.00 12,677.76
Pasir Pasang m3 0.0200 176,600.00 3,532.00
JUMLAH HARGA BAHAN 16,209.76
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 59,250.00
B BAHAN
Semen Portland Kg 10.2240 1,240.00 12,677.76
Pasir Pasang m3 0.0200 176,600.00 3,532.00
JUMLAH HARGA BAHAN 16,209.76
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 59,250.00
B BAHAN
Semen Portland Kg 7.7760 1,240.00 9,642.24
Pasir Pasang m3 0.0230 176,600.00 4,061.80
JUMLAH HARGA BAHAN 13,704.04
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 59,250.00
B BAHAN
Semen Portland Kg 6.2400 1,240.00 7,737.60
Pasir Pasang m3 0.0240 176,600.00 4,238.40
JUMLAH HARGA BAHAN 11,976.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 59,250.00
B BAHAN
Semen Portland Kg 5.1840 1,240.00 6,428.16
Pasir Pasang m3 0.0260 176,600.00 4,591.60
JUMLAH HARGA BAHAN 11,019.76
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 59,250.00
B BAHAN
Semen Portland Kg 4.4160 1,240.00 5,475.84
Pasir Pasang m3 0.0270 176,600.00 4,768.20
JUMLAH HARGA BAHAN 10,244.04
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 59,250.00
B BAHAN
Semen Portland Kg 3.9360 1,240.00 4,880.64
Pasir Pasang m3 0.0280 176,600.00 4,944.80
JUMLAH HARGA BAHAN 9,825.44
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 59,250.00
B BAHAN
Semen Portland Kg 3.4560 1,240.00 4,285.44
Pasir Pasang m3 0.0290 176,600.00 5,121.40
JUMLAH HARGA BAHAN 9,406.84
C PERALATAN
JENIS PEKERJAAN : A.4.4.2.9 Pemasangan 1 m2 Plesteran 1PC : 1/2Kapur Padam : 3 Pasir Pasang tebal 15 mm
SATUAN : M2
HARGA SATUAN : Rp 80,375.02
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 105,000.00 37,800.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 61,050.00
B BAHAN
Semen Portland Kg 5.7600 1,240.00 7,142.40
Kapur Padam m3 0.0030 860,000.00 2,580.00
Pasir Pasang m3 0.0130 176,600.00 2,295.80
JUMLAH HARGA BAHAN 12,018.20
C PERALATAN
JENIS PEKERJAAN : A.4.4.2.10 Pemasangan 1 m2 Plesteran 1PC : 2Kapur Padam : 8 Pasir Pasang tebal 15 mm
SATUAN : M2
HARGA SATUAN : Rp 79,862.20
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 105,000.00 37,800.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 61,050.00
B BAHAN
Semen Portland Kg 3.0000 1,240.00 3,720.00
Kapur Padam m3 0.0050 860,000.00 4,300.00
Pasir Pasang m3 0.0200 176,600.00 3,532.00
JUMLAH HARGA BAHAN 11,552.00
C PERALATAN
JENIS PEKERJAAN : A.4.4.2.11 Pemasangan 1 m2 Plesteran 1Semen Portland : 1Kapur Padam : 1 Pasir Pasang tebal 15 mm
SATUAN : M2
HARGA SATUAN : Rp 77,429.62
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 105,000.00 37,800.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 61,050.00
B BAHAN
Semen Portland m3 0.0090 1,240.00 11.16
Kapur Padam m3 0.0090 860,000.00 7,740.00
Pasir Pasang m3 0.0090 176,600.00 1,589.40
JUMLAH HARGA BAHAN 9,340.56
C PERALATAN
JENIS PEKERJAAN : A.4.4.2.12 Pemasangan 1 m2 Plesteran 1Semen Portland : 1Kapur Padam : 2 Pasir Pasang tebal 15 mm
SATUAN : M2
HARGA SATUAN : Rp 76,700.45
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 105,000.00 37,800.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 61,050.00
B BAHAN
Semen Portland m3 0.0070 1,240.00 8.68
Kapur Padam m3 0.0070 860,000.00 6,020.00
Pasir Pasang m3 0.0150 176,600.00 2,649.00
JUMLAH HARGA BAHAN 8,677.68
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 105,000.00 42,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0220 175,000.00 3,850.00
JUMLAH TENAGA KERJA 79,350.00
B BAHAN
Semen Portland Kg 13.6320 1,240.00 16,903.68
Pasir Pasang m3 0.0270 176,600.00 4,768.20
JUMLAH HARGA BAHAN 21,671.88
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 105,000.00 27,300.00
Tukang batu L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 63,075.00
B BAHAN
Semen Portland Kg 10.3680 1,240.00 12,856.32
Pasir Pasang m3 0.0310 176,600.00 5,474.60
JUMLAH HARGA BAHAN 18,330.92
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 105,000.00 42,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0220 175,000.00 3,850.00
JUMLAH TENAGA KERJA 79,350.00
B BAHAN
Semen Portland Kg 8.3200 1,240.00 10,316.80
Pasir Pasang m3 0.0320 176,600.00 5,651.20
JUMLAH HARGA BAHAN 15,968.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 105,000.00 42,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0220 175,000.00 3,850.00
JUMLAH TENAGA KERJA 79,350.00
B BAHAN
Semen Portland Kg 6.9120 1,240.00 8,570.88
Pasir Pasang m3 0.0350 176,600.00 6,181.00
JUMLAH HARGA BAHAN 14,751.88
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 105,000.00 42,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0220 175,000.00 3,850.00
JUMLAH TENAGA KERJA 79,350.00
B BAHAN
Semen Portland Kg 5.8880 1,240.00 7,301.12
Pasir Pasang m3 0.0360 176,600.00 6,357.60
JUMLAH HARGA BAHAN 13,658.72
C PERALATAN
JENIS PEKERJAAN : A.4.4.2.18 Pemasangan 1 m2 Plesteran 1Semen Portland : 1Kapur Padam : 2 Pasir Pasang tebal 20 mm
SATUAN : M2
HARGA SATUAN : Rp 107,612.96
A TENAGA
Pekerja L.01 OH 0.4400 105,000.00 46,200.00
Tukang L.02 OH 0.2200 150,000.00 33,000.00
Kepala tukang L.03 OH 0.0220 175,000.00 3,850.00
Mandor L.04 OH 0.0220 175,000.00 3,850.00
JUMLAH TENAGA KERJA 86,900.00
B BAHAN
Semen Portland m3 0.0090 1,240.00 11.16
Kapur Padam m3 0.0090 860,000.00 7,740.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
JUMLAH HARGA BAHAN 10,929.96
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.0750 150,000.00 11,250.00
Kepala tukang L.03 OH 0.0080 175,000.00 1,400.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 29,800.00
B BAHAN
Semen Portland kg 5.1840 1,240.00 6,428.16
Pasir Pasang m3 0.0260 176,600.00 4,591.60
JUMLAH HARGA BAHAN 11,019.76
C PERALATAN
JENIS PEKERJAAN : A.4.4.2.20 Pemasangan 1 m2 Plesteran skoning 1PC : 3 Pasir Pasang lebar 10 Cm
SATUAN : M2
HARGA SATUAN : Rp 86,917.38
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 105,000.00 8,400.00
Tukang L.02 OH 0.4000 150,000.00 60,000.00
Kepala tukang L.03 OH 0.0400 175,000.00 7,000.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 76,100.00
B BAHAN
Semen Portland Kg 0.5000 1,240.00 620.00
Pasir Pasang m3 0.0130 176,600.00 2,295.80
JUMLAH HARGA BAHAN 2,915.80
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4500 105,000.00 47,250.00
Tukang L.02 OH 0.2250 150,000.00 33,750.00
Kepala tukang L.03 OH 0.0230 175,000.00 4,025.00
Mandor L.04 OH 0.0230 175,000.00 4,025.00
JUMLAH TENAGA KERJA 89,050.00
B BAHAN
Semen Portland Kg 10.0000 1,240.00 12,400.00
Batu Granit Kg 15.0000 35,190.00 527,850.00
JUMLAH HARGA BAHAN 540,250.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.4500 105,000.00 47,250.00
Tukang L.02 OH 0.2250 150,000.00 33,750.00
Kepala tukang L.03 OH 0.0230 175,000.00 4,025.00
Mandor L.04 OH 0.0230 175,000.00 4,025.00
JUMLAH TENAGA KERJA 89,050.00
B BAHAN
Semen Portland Kg 10.0000 1,240.00 12,400.00
Batu traso Kg 15.0000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 50,875.00
B BAHAN
Semen Portland Kg 4.3200 1,240.00 5,356.80
Pasir Pasang Kg 0.0060 176,600.00 1,059.60
JUMLAH HARGA BAHAN 6,416.40
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.0750 150,000.00 11,250.00
Kepala tukang L.03 OH 0.0080 175,000.00 1,400.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 29,800.00
B BAHAN
Semen Portland Kg 3.1080 1,240.00 3,853.92
JUMLAH HARGA BAHAN 3,853.92
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 105,000.00 7,350.00
Tukang L.02 OH 0.0350 150,000.00 5,250.00
Kepala tukang L.03 OH 0.0040 175,000.00 700.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 14,000.00
B BAHAN
Semen Portland Kg 1.6000 1,240.00 1,984.00
JUMLAH HARGA BAHAN 1,984.00
C PERALATAN
JENIS PEKERJAAN : A.4.4.2.26 Pemasangan 1 m2 finishing siar pasangan batu kali, Camp, 1PC : 2 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 67,506.12
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 59,250.00
B BAHAN
Semen Portland Kg 6.3400 1,240.00 7,861.60
Pasir Pasang Kg 0.0120 176,600.00 2,119.20
JUMLAH HARGA BAHAN 2,119.20
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0100 175,000.00 1,750.00
JUMLAH TENAGA KERJA 39,500.00
B BAHAN
Semen Portland Kg 3.2500 1,240.00 4,030.00
JUMLAH HARGA BAHAN 4,030.00
C PERALATAN
JENIS PEKERJAAN : A.4.4.3.1 Pemasangan 1 m2 Lantai ubin Semen Portland abu-abu ukuran 40 Cm x 40 Cm
SATUAN : M2
HARGA SATUAN : #VALUE!
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 49,550.00
B BAHAN
Ubin abu-abu Bh 6.6300 a #VALUE!
Semen Portland Kg 9.8000 1,240.00 12,152.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JENIS PEKERJAAN : A.4.4.3.2 Pemasangan 1 m2 Lantai ubin Semen Portland abu-abu ukuran 30 Cm x 30 Cm
SATUAN : M2
HARGA SATUAN : #VALUE!
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 49,550.00
B BAHAN
Ubin abu-abu Bh 11.8700 a #VALUE!
Semen Portland Kg 10.0000 1,240.00 12,400.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JENIS PEKERJAAN : A.4.4.3.3 Pemasangan 1 m2 Lantai ubin Semen Portland abu-abu ukuran 20 Cm x20 Cm
SATUAN : M2
HARGA SATUAN : #VALUE!
A TENAGA
Pekerja L.01 OH 0.2700 105,000.00 28,350.00
Tukang L.02 OH 0.1350 150,000.00 20,250.00
Kepala tukang L.03 OH 0.0140 175,000.00 2,450.00
Mandor L.04 OH 0.0140 175,000.00 2,450.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Ubin abu-abu Bh 26.5000 a #VALUE!
Semen Portland Kg 10.4000 1,240.00 12,896.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 49,550.00
B BAHAN
Ubin warna Bh 6.6300 15,000.00 99,450.00
Semen Portland Kg 9.8000 1,240.00 12,152.00
Semen warna (tepung affa) Kg 0.6000 15,400.00 9,240.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN 128,789.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.2600 105,000.00 27,300.00
Tukang L.02 OH 0.1300 150,000.00 19,500.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 51,350.00
B BAHAN
Ubin warna Bh 11.8700 Err:509 Err:509
Semen Portland Kg 10.0000 1,240.00 12,400.00
Semen warna (tepung affa) Kg 0.6000 15,400.00 9,240.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.2700 105,000.00 28,350.00
Tukang L.02 OH 0.1350 150,000.00 20,250.00
Kepala tukang L.03 OH 0.0140 175,000.00 2,450.00
Mandor L.04 OH 0.0140 175,000.00 2,450.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Ubin warna Bh 26.5000 Err:509 Err:509
Semen Portland Kg 10.4000 1,240.00 12,896.00
Semen warna (tepung affa) Kg 1.0000 15,400.00 15,400.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 49,550.00
B BAHAN
Ubin teraso Bh 6.6300 A #VALUE!
Semen Portland Kg 9.8000 1,240.00 12,152.00
Semen warna (tepung affa) Kg 1.3000 15,400.00 20,020.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.2600 105,000.00 27,300.00
Tukang L.02 OH 0.1300 150,000.00 19,500.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 51,350.00
B BAHAN
Ubin teraso Bh 11.8700 #DIV/0! #DIV/0!
Semen Portland Kg 10.0000 1,240.00 12,400.00
Semen warna (tepung affa) Kg 1.5000 15,400.00 23,100.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN #DIV/0!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 49,550.00
B BAHAN
Granit ukuran 40 Cm x 40 Cm Bh 6.6300 35,190.00 233,309.70
Semen Portland Kg 9.8000 1,240.00 12,152.00
Semen warna (tepung affa) Kg 1.3000 15,400.00 20,020.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN 273,428.70
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 105,000.00 27,300.00
Tukang L.02 OH 0.1300 150,000.00 19,500.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 51,350.00
B BAHAN
Granit ukuran 30 Cm x 30 Cm Bh 11.8700 35,100.00 416,637.00
Semen Portland Kg 10.0000 1,240.00 12,400.00
Semen warna (tepung affa) Kg 1.5000 15,400.00 23,100.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN 460,084.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 49,550.00
B BAHAN
Ubin teralux Bh 6.6300 a #VALUE!
Semen Portland Kg 9.8000 1,240.00 12,152.00
Semen warna (tepung affa) Kg 1.3000 15,400.00 20,020.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.2600 105,000.00 27,300.00
Tukang L.02 OH 0.1300 150,000.00 19,500.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 51,350.00
B BAHAN
Ubin teralux Bh 11.8700 a #VALUE!
Semen Portland Kg 10.0000 1,240.00 12,400.00
Semen warna (tepung affa) Kg 1.5000 15,400.00 23,100.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JENIS PEKERJAAN : A.4.4.3.13 Pemasangan 1 m2 Lantai ubin teralux marmer (Keramik) ukuran 60 Cm x 60 Cm
SATUAN : M2
HARGA SATUAN : Rp 525,636.10
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2400 105,000.00 25,200.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0120 175,000.00 2,100.00
JUMLAH TENAGA KERJA 47,400.00
B BAHAN
Keramik 60 x 60 cm Bh 3.1000 125,000.00 387,500.00
Semen Portland Kg 9.6000 1,240.00 11,904.00
Semen warna (tepung affa) Kg 1.5000 15,400.00 23,100.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN 430,451.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 49,550.00
B BAHAN
Ubin teralux marmer Bh 6.6300 a #VALUE!
Semen Portland Kg 9.8000 1,240.00 12,152.00
Semen warna (tepung affa) Kg 1.3000 15,400.00 20,020.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 105,000.00 27,300.00
Tukang L.02 OH 0.1300 150,000.00 19,500.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 51,350.00
B BAHAN
Ubin teralux marmer Bh 11.8700 a #VALUE!
Semen Portland Kg 10.0000 1,240.00 12,400.00
Semen warna (tepung affa) Kg 1.5000 15,400.00 23,100.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JENIS PEKERJAAN : A.4.4.3.16 Pemasangan 1 M1 plint ubin Semen Portland abu-abu ukuran 15 Cm x 20 Cm
SATUAN : M1
HARGA SATUAN : #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint ubin Semen Portland Bh 5.3000 a #VALUE!
Semen Portland Kg 1.6500 1,240.00 2,046.00
Pasir Pasang m3 0.0040 176,600.00 706.40
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JENIS PEKERJAAN : A.4.4.3.17 Pemasangan 1 M1 plint ubin Semen Portland abu-abu ukuran 10 Cm x 30 Cm
SATUAN : M1
HARGA SATUAN : #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint ubin Semen Portland Bh 3.5300 a #VALUE!
Semen Portland Kg 1.2400 1,240.00 1,537.60
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JENIS PEKERJAAN : A.4.4.3.18 Pemasangan 1 M1 plint ubin Semen Portland abu-abu ukuran 10 Cm x 40 Cm
SATUAN : M1
HARGA SATUAN : #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint ubin Semen Portland Bh 2.6500 a #VALUE!
Semen Portland Kg 1.2400 1,240.00 1,537.60
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint ubin warna Bh 2.6500 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1500 15,400.00 2,310.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint ubin warna Bh 3.5300 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint ubin warna Bh 2.6500 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint ubin teraso Bh 3.5300 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint ubin teraso Bh 2.6500 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint ubin Granit Bh 2.6500 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint ubin Granit Bh 3.5300 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint teralux kerang Bh 2.6300 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint teralux kerang Bh 3.5300 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint teralux marmer Bh 1.7000 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint teralux marmer Bh 2.6500 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 25,400.00
B BAHAN
Plint teralux marmer Bh 3.5300 a #VALUE!
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
Pasir Pasang m3 0.0030 176,600.00 529.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 105,000.00 37,800.00
Tukang L.02 OH 0.1800 150,000.00 27,000.00
Kepala tukang L.03 OH 0.0180 175,000.00 3,150.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 71,100.00
B BAHAN
Teraso Bh 0.0360 a #VALUE!
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
Ubin keramik Bh 53.0000 a #VALUE!
Semen Portland Kg 8.1900 1,240.00 10,155.60
Pasir Pasang m3 0.0450 176,600.00 7,947.00
Semen warna (tepung affa) Kg 2.7500 15,400.00 42,350.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
Ubin keramik Bh 106.0000 a #VALUE!
Semen Portland Kg 8.1900 1,240.00 10,155.60
Pasir Pasang m3 0.0450 176,600.00 7,947.00
Semen warna (tepung affa) Kg 3.2000 15,400.00 49,280.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
Keramik 40x40 Doos 1.0500 68,000.00 71,400.00
Semen Portland Kg 8.1900 1,240.00 10,155.60
Pasir Pasang m3 0.0450 176,600.00 7,947.00
Semen warna (tepung affa) Kg 0.5000 15,400.00 7,700.00
JUMLAH HARGA BAHAN 97,202.60
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
keramik ukuran 60 Cm x 60 Cm Bh 2.7778 125,000.00 347,222.22
Semen Portland Kg 10.0000 1,240.00 12,400.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
Semen warna (tepung affa) Kg 1.5000 15,400.00 23,100.00
JUMLAH HARGA BAHAN 390,669.22
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
keramik ukuran 40 Cm x 40 Cm Bh 6.2500 60,600.00 378,750.00
Semen Portland Kg 10.0000 1,240.00 12,400.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
Semen warna (tepung affa) Kg 1.5000 15,400.00 23,100.00
JUMLAH HARGA BAHAN 422,197.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
keramik ukuran 30 Cm x 30 Cm Doos 1.0500 60,000.00 63,000.00
Semen Portland Kg 10.0000 1,240.00 12,400.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
Semen warna (tepung affa) Kg 0.5000 15,400.00 7,700.00
JUMLAH HARGA BAHAN 91,047.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
keramik ukuran 20 Cm x 20 Cm Doos 1.0500 62,000.00 65,100.00
Semen Portland Kg 10.4000 1,240.00 12,896.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
Semen warna (tepung affa) Kg 0.5000 15,400.00 7,700.00
JUMLAH HARGA BAHAN 93,643.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
keramik ukuran 25 Cm x 25 Cm Doos 17.6000 5,000.00 88,000.00
Semen Portland Kg 10.0000 1,240.00 12,400.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
Semen warna (tepung affa) Kg 1.5000 15,400.00 23,100.00
JUMLAH HARGA BAHAN 131,447.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.0500 105,000.00 110,250.00
Tukang L.02 OH 0.5250 150,000.00 78,750.00
Kepala tukang L.03 OH 0.0530 175,000.00 9,275.00
Mandor L.04 OH 0.0530 175,000.00 9,275.00
JUMLAH TENAGA KERJA 207,550.00
B BAHAN
Ubin keramik Bh 33.0000 a #VALUE!
Semen Portland Kg 9.8000 1,240.00 12,152.00
Pasir Pasang m3 0.0450 176,600.00 7,947.00
Semen warna (tepung affa) Kg 4.3700 15,400.00 67,298.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
Ubin keramik Bh 11.8700 a #VALUE!
Semen Portland Kg 14.1500 1,240.00 17,546.00
Pasir Pasang m3 0.0390 176,600.00 6,887.40
Semen warna (tepung affa) Kg 2.0000 15,400.00 30,800.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 29,950.00
B BAHAN
Plint keramik 10 Cm x 20 Cm Bh 5.3000 4,200.00 22,260.00
Semen Portland Kg 1.1400 1,240.00 1,413.60
Pasir Pasang m3 0.0030 176,600.00 529.80
Semen warna (tepung affa) Kg 0.0250 15,400.00 385.00
JUMLAH HARGA BAHAN 24,588.40
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 29,950.00
B BAHAN
Plint keramik 10 Cm x 10 Cm Bh 10.6000 3,800.00 40,280.00
Semen Portland Kg 1.1400 1,240.00 1,413.60
Pasir Pasang m3 0.0030 176,600.00 529.80
Semen warna (tepung affa) Kg 0.0500 15,400.00 770.00
JUMLAH HARGA BAHAN 42,993.40
C PERALATAN
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 72,943.40
E Overhead & profit 10% x Jumlah 7,294.34
F Harga Satuan Pekerjaan (D+E) 80,237.74
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 29,950.00
B BAHAN
Plint keramik 10 Cm x 30 Cm Bh 3.5333 10,100.00 35,686.67
Semen Portland Kg 1.1400 1,240.00 1,413.60
Pasir Pasang m3 0.0030 176,600.00 529.80
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
JUMLAH HARGA BAHAN 39,170.07
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 29,950.00
B BAHAN
Plint keramik 10 Cm x 40 Cm Bh 2.6500 11,700.00 31,005.00
Semen Portland Kg 1.1400 1,240.00 1,413.60
Pasir Pasang m3 0.0030 176,600.00 529.80
Semen warna (tepung affa) Kg 0.1000 15,400.00 1,540.00
JUMLAH HARGA BAHAN 34,488.40
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 105,000.00 9,450.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 29,950.00
B BAHAN
Plint keramik Bh 5.3000 6,000.00 31,800.00
Semen Portland Kg 0.5700 1,240.00 706.80
Pasir Pasang m3 0.0015 176,600.00 264.90
Semen warna (tepung affa) Kg 0.0130 15,400.00 200.20
JUMLAH HARGA BAHAN 32,971.90
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 105,000.00 78,750.00
Tukang L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0750 175,000.00 13,125.00
Mandor L.04 OH 0.0380 175,000.00 6,650.00
JUMLAH TENAGA KERJA 211,025.00
B BAHAN
Internal cove Bh 5.3000 9,500.00 50,350.00
Semen Portland Kg 1.1400 1,240.00 1,413.60
Semen warna (tepung affa) kg 0.0030 176,600.00 529.80
Pasir Pasang m3 0.1000 15,400.00 1,540.00
JUMLAH HARGA BAHAN 53,833.40
C PERALATAN
JENIS PEKERJAAN : A.4.4.3.43 Pemasangan 1 m2 Lantai marmer untuk ukuran 100 Cm x 100 Cm
SATUAN : M2
HARGA SATUAN : #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
Marmer Bh 1.0600 z #VALUE!
Semen Portland Kg 8.1900 1,240.00 10,155.60
Semen warna (tepung affa) kg 0.1340 15,400.00 2,063.60
Pasir Pasang m3 0.0450 176,600.00 7,947.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1700 105,000.00 17,850.00
Tukang L.02 OH 0.1700 150,000.00 25,500.00
Kepala tukang L.03 OH 0.0170 175,000.00 2,975.00
Mandor L.04 OH 0.0090 175,000.00 1,575.00
JUMLAH TENAGA KERJA 47,900.00
B BAHAN
Karpet m2 1.0500 z #VALUE!
Lem Kg 0.3500 18,800.00 6,580.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1200 105,000.00 12,600.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 33,750.00
B BAHAN
Underlayer m2 1.0500 z #VALUE!
Lem Kg 0.3500 18,800.00 6,580.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
Parquet m2 1.0500 z #VALUE!
Lem Kg 0.6000 18,800.00 11,280.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
Parquet m2 1.0500 z #VALUE!
Lem Kg 0.6000 18,800.00 11,280.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 197,500.00
B BAHAN
Porselen Doos 1.0500 z #VALUE!
Semen Portland Kg 9.3000 1,240.00 11,532.00
Semen warna (tepung affa) kg 0.5000 15,400.00 7,700.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 177,750.00
B BAHAN
Porselen Bh 53.0000 z #VALUE!
Semen Portland Kg 9.3000 1,240.00 11,532.00
Semen warna (tepung affa) kg 2.7500 15,400.00 42,350.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 177,750.00
B BAHAN
Porselen Bh 26.0000 z #VALUE!
Semen Portland Kg 9.3000 1,240.00 11,532.00
Semen warna (tepung affa) kg 1.9400 15,400.00 29,876.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 177,750.00
B BAHAN
Keramik artistik Bh 53.0000 z #VALUE!
Semen Portland Kg 9.3000 1,240.00 11,532.00
Semen warna (tepung affa) kg 2.7500 15,400.00 42,350.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 177,750.00
B BAHAN
Keramik artistik Bh 106.0000 z #VALUE!
Semen Portland Kg 9.3000 1,240.00 11,532.00
Semen warna (tepung affa) kg 2.9000 15,400.00 44,660.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 177,750.00
B BAHAN
Keramik artistik Bh 53.0000 a #VALUE!
Semen Portland Kg 9.3000 1,240.00 11,532.00
Semen warna (tepung affa) kg 2.7500 15,400.00 42,350.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 177,750.00
B BAHAN
Keramik artistik Bh 26.5000 Err:509 Err:509
Semen Portland Kg 9.3000 1,240.00 11,532.00
Semen warna (tepung affa) kg 1.9400 15,400.00 29,876.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 177,750.00
B BAHAN
Keramik 20 Cm x 20 Cm Bh 53.0000 z #VALUE!
Semen Portland Kg 9.3000 1,240.00 11,532.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
Semen warna (tepung affa) Kg 2.7500 15,400.00 42,350.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 177,750.00
B BAHAN
Keramik 20 Cm x 20 Cm Bh 26.5000 Err:509 Err:509
Semen Portland Kg 9.3000 1,240.00 11,532.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
Semen warna (tepung affa) Kg 1.9400 15,400.00 29,876.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 177,750.00
B BAHAN
Keramik 20 Cm x 25 Cm Bh 21.2000 - -
Semen Portland Kg 9.3000 1,240.00 11,532.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
Semen warna (tepung affa) Kg 1.9400 15,400.00 29,876.00
JUMLAH HARGA BAHAN 44,586.80
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 177,750.00
B BAHAN
Keramik 20 Cm x 40 Cm Bh 13.2500 - -
Semen Portland Kg 9.3000 1,240.00 11,532.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
Semen warna (tepung affa) Kg 1.9400 15,400.00 29,876.00
JUMLAH HARGA BAHAN 44,586.80
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 105,000.00 94,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0450 175,000.00 7,875.00
JUMLAH TENAGA KERJA 177,750.00
B BAHAN
Keramik 25 Cm x 40 Cm Bh 13.2500 8,000.00 106,000.00
Semen Portland Kg 9.3000 1,240.00 11,532.00
Pasir Pasang m3 0.0180 176,600.00 3,178.80
Semen warna (tepung affa) Kg 1.9400 15,400.00 29,876.00
JUMLAH HARGA BAHAN 150,586.80
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.3000 105,000.00 136,500.00
Tukang L.02 OH 0.6500 150,000.00 97,500.00
Kepala tukang L.03 OH 0.0650 175,000.00 11,375.00
Mandor L.04 OH 0.0650 175,000.00 11,375.00
JUMLAH TENAGA KERJA 256,750.00
B BAHAN
Marmer Bh 1.0600 z #VALUE!
Semen Portland Kg 12.4400 1,240.00 15,425.60
Semen warna (tepung affa) m3 0.6500 15,400.00 10,010.00
Pasir Pasang Kg 0.0250 176,600.00 4,415.00
Paku 12 Cm Bh 3.0300 Err:509 Err:509
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 197,500.00
B BAHAN
Bata pelapis Bh 63.0000 z #VALUE!
Semen Portland Kg 12.4400 1,240.00 15,425.60
Semen warna (tepung affa) m3 2.7500 15,400.00 42,350.00
Pasir Pasang Kg 0.0250 176,600.00 4,415.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
Batu paras Bh 1.1000 z #VALUE!
Semen Portland Kg 11.7500 1,240.00 14,570.00
Pasir Pasang m3 0.0350 176,600.00 6,181.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 0.3500 150,000.00 52,500.00
Kepala tukang L.03 OH 0.0350 175,000.00 6,125.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 138,250.00
B BAHAN
Batu tempel hitam Bh 1.1000 z #VALUE!
Semen Portland Kg 11.7500 1,240.00 14,570.00
Pasir Pasang m3 0.0350 176,600.00 6,181.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 42,275.00
B BAHAN
Vynil Bh 11.8700 a #VALUE!
Lem Kg 0.3500 18,800.00 6,580.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 105,000.00 36,750.00
Tukang L.02 OH 0.1750 150,000.00 26,250.00
Kepala tukang L.03 OH 0.0170 175,000.00 2,975.00
Mandor L.04 OH 0.0020 175,000.00 350.00
JUMLAH TENAGA KERJA 66,325.00
B BAHAN
Walpaper Bh 2.2000 a #VALUE!
Lem Kg 0.2500 18,800.00 4,700.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 105,000.00 12,600.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 33,750.00
B BAHAN
Floor harderner Kg 5.0000 32,500.00 162,500.00
JUMLAH HARGA BAHAN 162,500.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 105,000.00 8,400.00
Tukang L.02 OH 0.0800 150,000.00 12,000.00
Kepala tukang L.03 OH 0.0080 175,000.00 1,400.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 23,200.00
B BAHAN
plint vynil ukuran 15 Cm x 30 Cm Bh 1.7600 57,500.00 101,200.00
Lem Kg 0.0800 18,800.00 1,504.00
JUMLAH HARGA BAHAN 102,704.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 105,000.00 12,600.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 33,750.00
B BAHAN
Papan kayu kelas I m3 0.0030 4,103,500.00 12,310.50
Paku/skrup 5 Cm Kg 0.0500 18,600.00 930.00
JUMLAH HARGA BAHAN 13,240.50
C PERALATAN
JENIS PEKERJAAN : A.4.4.3.64 Pemasangan 1 M2 Paving Block natural tebal 6 cm (Type Balok)
SATUAN : M2
HARGA SATUAN : Rp 416,004
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 112,275.00
B BAHAN `
Paving Block 6 cm m2 1.0100 220,500.00 222,705.00
Pasir Beton m3 0.0500 176,500.00 8,825.00
JUMLAH HARGA BAHAN 231,530.00
C PERALATAN
Peralatan % 10.0000 343,805.00 34,380.50
JUMLAH HARGA ALAT 34,380.50
D JUMLAH (A+B+C) 378,185.50
E Overhead & profit 10% x Jumlah 37,818.55
F Harga Satuan Pekerjaan (D+E) 416,004.05
JENIS PEKERJAAN : A.4.4.3.65 Pemasangan 1 M2 Paving Block natural tebal 8 cm (Type Balok)
SATUAN : M2
HARGA SATUAN : Rp 862,188
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 105,000.00 52,500.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 138,525.00
B BAHAN `
Paving Block 8 cm m2 1.0100 354,760.00 358,307.60
Pasir Beton m3 2.0700 176,500.00 365,355.00
JUMLAH HARGA BAHAN 723,662.60
C PERALATAN
Peralatan % 10.0000
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 862,187.60
E Overhead & profit 10% x Jumlah -
F Harga Satuan Pekerjaan (D+E) 862,187.60
A TENAGA
Pekerja L.01 OH 0.5000 105,000.00 52,500.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 138,525.00
B BAHAN `
Paving Block 6 cm m2 1.0100 230,300.00 232,603.00
Pasir Beton Kg 0.0500 176,500.00 8,825.00
JUMLAH HARGA BAHAN 241,428.00
C PERALATAN
Peralatan % 10.0000 379,953.00 37,995.30
JUMLAH HARGA ALAT 37,995.30
D JUMLAH (A+B+C) 417,948.30
E Overhead & profit 10% x Jumlah 41,794.83
F Harga Satuan Pekerjaan (D+E) 459,743.13
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 105,000.00 52,500.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 138,525.00
B BAHAN `
Paving Block 8 cm m2 1.0100 276,010.00 278,770.10
Pasir Beton Kg 0.0500 176,500.00 8,825.00
JUMLAH HARGA BAHAN 287,595.10
C PERALATAN
Peralatan % 10.0000 426,120.10 42,612.01
JUMLAH HARGA ALAT 42,612.01
D JUMLAH (A+B+C) 468,732.11
E Overhead & profit 10% x Jumlah 46,873.21
F Harga Satuan Pekerjaan (D+E) 515,605.32
JENIS PEKERJAAN : A.4.4.3.68 Pemasangan 1 M2 Paving Block warna tebal 8 cm (Type Balok)
SATUAN : M2
HARGA SATUAN : Rp 650,530
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 105,000.00 52,500.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 138,525.00
B BAHAN `
Paving Block 8 cm m2 1.0100 386,414.00 390,278.14
Pasir Beton Kg 0.0500 176,500.00 8,825.00
JUMLAH HARGA BAHAN 399,103.14
C PERALATAN
Peralatan % 10.0000 537,628.14 53,762.81
JUMLAH HARGA ALAT 53,762.81
D JUMLAH (A+B+C) 591,390.95
E Overhead & profit 10% x Jumlah 59,139.10
F Harga Satuan Pekerjaan (D+E) 650,530.05
JENIS PEKERJAAN : A.4.5.1.1 Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
SATUAN : M2
HARGA SATUAN : Rp 62,349
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 105,000.00 3,150.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 15,575.00
B BAHAN
Asbes semen m2 1.1000 37,200.00 40,920.00
Paku triplek Kg 0.0100 18,600.00 186.00
JUMLAH HARGA BAHAN 41,106.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 105,000.00 12,600.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 33,750.00
B BAHAN
Akustik Bh 12.0000 z #VALUE!
Paku triplek Kg 0.0500 18,600.00 930.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 105,000.00 12,600.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 33,750.00
B BAHAN
Akustik Bh 5.8000 z #VALUE!
Paku triplek Kg 0.0500 18,600.00 930.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 28,125.00
B BAHAN
Akustik Bh 1.5000 a #VALUE!
Paku triplek Kg 0.0500 18,600.00 930.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JENIS PEKERJAAN : A.4.5.1.5 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) Cm, tebal 3 mm, 4 m & 6 mm
SATUAN : M2
HARGA SATUAN : Rp 59,931
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 28,125.00
B BAHAN
Tripleks Lembar 0.3750 68,800.00 25,800.00
Paku triplek Kg 0.0300 18,600.00 558.00
JUMLAH HARGA BAHAN 26,358.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 105,000.00 84,000.00
Tukang L.02 OH 0.8000 150,000.00 120,000.00
Kepala tukang L.03 OH 0.0800 175,000.00 14,000.00
Mandor L.04 OH 0.0400 175,000.00 7,000.00
JUMLAH TENAGA KERJA 225,000.00
B BAHAN
Kayu papan m3 0.0150 2,582,700.00 38,740.50
Paku triplek Kg 0.0100 18,600.00 186.00
JUMLAH HARGA BAHAN 38,926.50
C PERALATAN
JENIS PEKERJAAN : A.4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm
SATUAN : M2
HARGA SATUAN : Rp 56,608
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.0500 150,000.00 7,500.00
Kepala tukang L.03 OH 0.0050 175,000.00 875.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 19,750.00
B BAHAN
Gypsum board Lembar 0.3640 81,500.00 29,666.00
Paku triplek Kg 0.1100 18,600.00 2,046.00
JUMLAH HARGA BAHAN 31,712.00
C PERALATAN
JENIS PEKERJAAN : A.4.5.1.8 Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) Cm berikut rangka alluminium
SATUAN : M2
HARGA SATUAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 105,000.00 52,500.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0250 175,000.00 4,375.00
JUMLAH TENAGA KERJA 140,625.00
B BAHAN
Profil Allum "T" m 3.6000 Err:509 Err:509
Kawat dia 4 mm Kg 0.1500 z #VALUE!
Ramset Bh 1.0500 Err:509 Err:509
Akustik 60 x 120 Lbr 1.5000 z #VALUE!
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 105,000.00 5,250.00
Tukang L.02 OH 0.0500 150,000.00 7,500.00
Kepala tukang L.03 OH 0.0050 175,000.00 875.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 14,150.00
B BAHAN
List Kayu Profil m 3.6000 4,000.00 14,400.00
Paku Kg 0.1500 18,600.00 2,790.00
JUMLAH HARGA BAHAN 17,190.00
C PERALATAN
JENIS PEKERJAAN : - Pekerjaan Pasangan Plafound Pvc ( JAVAPOND ) + Rangka Hollow Zinclaume4x4cm
SATUAN : M1
HARGA SATUAN : Rp 207,478
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.0500 150,000.00 7,500.00
Kepala tukang L.03 OH 0.0050 175,000.00 875.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 19,750.00
B BAHAN
Besi Hollow 40.20.2 M1 2.0000 6,000.00 12,000.00
Besi Hollow 20.20.2 M1 3.5000 6,000.00 21,000.00
Palafound PVC ( JavaFond) M1 5.0000 25,000.00 125,000.00
Sekrup Bh 0.2200 300.00 66.00
Joint Tape Roll 0.0500 16,000.00 800.00
Alat Bantu Ls 1.0000 10,000.00 10,000.00
-
JUMLAH HARGA BAHAN 168,866.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 105,000.00 1,050.00
Tukang L.02 OH 0.0050 150,000.00 750.00
Kepala tukang L.03 OH 0.0010 175,000.00 175.00
Mandor L.04 OH 0.0010 175,000.00 175.00
JUMLAH TENAGA KERJA 2,150.00
B BAHAN
List PVC M1 1.0500 12,000.00 12,600.00
Sekrup Kg 0.0110 25,000.00 275.00
-
JUMLAH HARGA BAHAN 12,875.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.3000 150,000.00 45,000.00
Kepala tukang L.03 OH 0.0300 105,000.00 3,150.00
Mandor L.04 OH 0.0100 150,000.00 1,500.00
JUMLAH TENAGA KERJA 70,650.00
B BAHAN
Kayu balok Klas II M3 0.0160 3,029,100.00 48,465.60
Paku Kg 0.2500 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.0750 150,000.00 11,250.00
Kepala tukang L.03 OH 0.0075 175,000.00 1,312.50
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 29,712.50
B BAHAN
Genteng palentong Bh 25.0000 z #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.0750 150,000.00 11,250.00
Kepala tukang L.03 OH 0.0075 175,000.00 1,312.50
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 29,712.50
B BAHAN
Genteng kodok Bh 25.0000 z #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.0750 150,000.00 11,250.00
Kepala tukang L.03 OH 0.0080 175,000.00 1,400.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 29,800.00
B BAHAN
Genteng kodok Bh 12.0000 z #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 105,000.00 42,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0020 175,000.00 350.00
JUMLAH TENAGA KERJA 75,850.00
B BAHAN
Genteng palentong Bh 5.0000 z #VALUE!
Semen Portland Kg 8.0000 1,240.00 9,920.00
Pasir Pasang m3 0.0320 176,600.00 5,651.20
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 105,000.00 42,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0020 175,000.00 350.00
JUMLAH TENAGA KERJA 75,850.00
B BAHAN
Genteng palentong Bh 5.0000 z #VALUE!
Semen Portland Kg 8.0000 1,240.00 9,920.00
Pasir Pasang m3 0.0320 176,600.00 5,651.20
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 105,000.00 42,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0020 175,000.00 350.00
JUMLAH TENAGA KERJA 75,850.00
B BAHAN
Genteng palentong Bh 4.0000 z #VALUE!
Semen Portland Kg 8.0000 1,240.00 9,920.00
Pasir Pasang m3 0.0320 176,600.00 5,651.20
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0670 150,000.00 10,050.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,200.00
B BAHAN
Rooflight 90 x 180 Lbr 0.6000 123,300.00 73,980.00
Paku biasa 1/2" - 1" Kg 0.0500 18,600.00 930.00
JUMLAH HARGA BAHAN 74,910.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0750 150,000.00 11,250.00
Kepala tukang L.03 OH 0.0080 175,000.00 1,400.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 28,750.00
B BAHAN
Asbes gelombang 92 x 250 Lbr 0.5000 48,500.00 24,250.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0750 150,000.00 11,250.00
Kepala tukang L.03 OH 0.0080 175,000.00 1,400.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 28,750.00
B BAHAN
Asbes gelombang 95 x 250 Lbr 0.6000 48,500.00 29,100.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.6000 48,500.00 29,100.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.7500 48,500.00 36,375.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.3500 48,500.00 16,975.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) Err:509
E Overhead & profit 10% x Jumlah Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.4200 48,500.00 20,370.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.4400 48,500.00 21,340.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.5100 48,500.00 24,735.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.8000 48,500.00 38,800.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.3700 48,500.00 17,945.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.3800 48,500.00 18,430.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.4600 48,500.00 22,310.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.4900 48,500.00 23,765.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Asbes gelombang Lbr 0.5700 48,500.00 27,645.00
Paku pancing 6 x 23 Kg 0.1200 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 105,000.00 8,820.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 30,545.00
B BAHAN
Bubung stel gel 0,92m Lbr 2.4000 26,200.00 62,880.00
Paku skrup 3,5" Bh 6.0000 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 105,000.00 8,820.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 30,545.00
B BAHAN
Bubung stel gel 0,92m Lbr 2.1000 26,200.00 55,020.00
Paku skrup 3,5" Bh 6.0000 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 105,000.00 8,820.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 30,545.00
B BAHAN
Bubung stel gel 0,92m Lbr 2.0500 26,200.00 53,710.00
Paku skrup 3,5" Bh 6.0000 Err:509 Err:509
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 105,000.00 8,820.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 30,545.00
B BAHAN
Nok paten 92 Cm Lbr 1.2000 a #VALUE!
Paku skrup 3,5" Bh 6.0000 Err:509 Err:509
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 105,000.00 8,820.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 30,545.00
B BAHAN
Nok paten 92 Cm Lbr 1.2000 z #VALUE!
Paku skrup 3,5" Bh 6.0000 Err:509 Err:509
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 105,000.00 8,820.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 30,545.00
B BAHAN
Nok paten 92 Cm Lbr 1.2000 z #VALUE!
Paku skrup 3,5" Bh 6.0000 Err:509 Err:509
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 35,975.00
B BAHAN
Nok paten 92 Cm Lbr 1.1000 z #VALUE!
Paku skrup 3,5" Bh 6.0000 Err:509 Err:509
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 105,000.00 8,820.00
Tukang L.02 OH 0.1250 150,000.00 18,750.00
Kepala tukang L.03 OH 0.0130 175,000.00 2,275.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 30,545.00
B BAHAN
Nok paten 92 Cm Lbr 1.1000 z #VALUE!
Paku skrup 3,5" Bh 6.0000 Err:509 Err:509
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0100 175,000.00 1,750.00
JUMLAH TENAGA KERJA 39,500.00
B BAHAN
Genteng beton Bh 11.0000 z #VALUE!
Paku biasa 2" - 5" Kg 0.0300 18,600.00 558.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.3000 150,000.00 45,000.00
Kepala tukang L.03 OH 0.0030 175,000.00 525.00
Mandor L.04 OH 0.0100 175,000.00 1,750.00
JUMLAH TENAGA KERJA 68,275.00
B BAHAN
Genteng Aspal lbr 6.9000 z #VALUE!
Plywood 6 mm Lbr 0.3500 z #VALUE!
Paku biasa 1/2" - 1" Kg 0.0300 18,600.00 558.00
Plastik aerator Bh 0.5000 z #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JENIS PEKERJAAN : A.4.5.2.32 Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana
SATUAN : M2
HARGA SATUAN : Rp 128,035
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0010 175,000.00 175.00
JUMLAH TENAGA KERJA 37,925.00
B BAHAN
Genteng metal bh 1.3000 57,500.00 74,750.00
Paku Biasa 1/2" - 1" Kg 0.2000 18,600.00 3,720.00
JUMLAH HARGA BAHAN 78,470.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0010 175,000.00 175.00
JUMLAH TENAGA KERJA 37,925.00
B BAHAN
Atap UVPC m2 1.1000 325,000.00 357,500.00
Self Drilling Screw pcs 9.0000 1,000.00 9,000.00
JUMLAH HARGA BAHAN 366,500.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2100 105,000.00 22,050.00
Tukang L.02 OH 0.1760 150,000.00 26,400.00
Kepala tukang L.03 OH 0.1170 175,000.00 20,475.00
Mandor L.04 OH 0.1170 175,000.00 20,475.00
JUMLAH TENAGA KERJA 89,400.00
B BAHAN
Main Truss Canal m1 2.5000 12,500.00 31,250.00
Roof Botton/Reng m1 5.1000 7,500.00 38,250.00
Self Drilling Screw dia. 6x20 mm (Truss) pcs 25.0000 400.00 10,000.00
Self Drilling Screw dia. 4x16 mm (Truss) pcs 35.0000 400.00 14,000.00
Dynabolt pcs 1.0000 1,500.00 1,500.00
A TENAGA
Pekerja L.01 OH 0.1660 105,000.00 17,430.00
Tukang L.02 OH 0.2500 150,000.00 37,500.00
Kepala tukang L.03 OH 0.0250 175,000.00 4,375.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 60,705.00
B BAHAN
Sirap kayu Bh 30.0000 z #VALUE!
Paku Kg 0.2000 18,600.00 3,720.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.4000 105,000.00 42,000.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0200 175,000.00 3,500.00
JUMLAH TENAGA KERJA 79,000.00
B BAHAN
Nok genteng beton Bh 3.5000 z #VALUE!
Paku biasa 1/2" - 1" Kg 0.0500 18,600.00 930.00
Semen Portland Kg 10.8000 1,240.00 13,392.00
Semen warna (tepung affa) m3 0.0320 15,400.00 492.80
Pasir Pasang Kg 1.0000 176,600.00 176,600.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1250 105,000.00 13,125.00
Tukang L.02 OH 0.2500 150,000.00 37,500.00
Kepala tukang L.03 OH 0.0250 175,000.00 4,375.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 56,050.00
B BAHAN
Nok genteng aspal Bh 2.0000 z #VALUE!
Paku biasa 1/2" - 1" Kg 0.0500 18,600.00 930.00
Kayu balok borneo m3 0.0035 4,035,700.00 14,124.95
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0130 175,000.00 2,275.00
JUMLAH TENAGA KERJA 53,650.00
B BAHAN
Nok genteng metal Bh 1.1000 z #VALUE!
Paku biasa 1/2" - 1" Kg 0.0500 18,600.00 930.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1250 105,000.00 13,125.00
Tukang L.02 OH 0.2500 150,000.00 37,500.00
Kepala tukang L.03 OH 0.0250 175,000.00 4,375.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 56,050.00
B BAHAN
Seng plat 3 x 6" Lbr 0.4000 39,900.00 15,960.00
Paku biasa 1/2" - 1" Kg 0.0500 18,600.00 930.00
Paku biasa 2" - 5" Kg 0.0500 18,600.00 930.00
JUMLAH HARGA BAHAN 17,820.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 105,000.00 12,600.00
Tukang L.02 OH 0.0600 150,000.00 9,000.00
Kepala tukang L.03 OH 0.0060 175,000.00 1,050.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 23,700.00
B BAHAN
Seng gel 3" x 6" Lbr 0.7000 55,200.00 38,640.00
Paku biasa 1/2" - 1" Kg 0.0200 18,600.00 372.00
JUMLAH HARGA BAHAN 39,012.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 28,525.00
B BAHAN
Seng gel 3" x 6" bjls 28 Lbr 0.3000 39,900.00 11,970.00
Paku biasa 1/2" - 1" Kg 0.0400 18,600.00 744.00
JUMLAH HARGA BAHAN 12,714.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0800 175,000.00 14,000.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 143,300.00
B BAHAN
Alluminium gel tbl 0,55 Lbr 1.0500 z #VALUE!
Paku hak panj 15 Cm Kg 0.0200 18,600.00 372.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) #VALUE!
E Overhead & profit 10% x Jumlah #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE!
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 1.0000 150,000.00 150,000.00
Kepala tukang L.03 OH 0.1000 175,000.00 17,500.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 186,750.00
B BAHAN
Nok atap seng Lbr 1.2000 a #VALUE!
Paku hak panj 15 Cm Kg 0.0400 18,600.00 744.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.0500 150,000.00 7,500.00
Kepala tukang L.03 OH 0.0050 175,000.00 875.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 25,525.00
B BAHAN
Alluminium foil m2 1.0500 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kls I
SATUAN : M3
HARGA SATUAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 7.0000 105,000.00 735,000.00
Tukang L.02 OH 21.0000 150,000.00 3,150,000.00
Kepala tukang L.03 OH 2.1000 175,000.00 367,500.00
Mandor L.04 OH 0.3500 175,000.00 61,250.00
JUMLAH TENAGA KERJA 4,313,750.00
B BAHAN
Balok kayu m3 1.1000 4,035,700.00 4,439,270.00
Paku 10 Cm Kg 1.2500 Err:509 Err:509
Lem kayu Kg 1.0000 18,800.00 18,800.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
SATUAN : M3
HARGA SATUAN : Rp 8,111,917
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 105,000.00 630,000.00
Tukang L.02 OH 18.0000 150,000.00 2,700,000.00
Kepala tukang L.03 OH 1.8000 175,000.00 315,000.00
Mandor L.04 OH 0.3000 175,000.00 52,500.00
JUMLAH TENAGA KERJA 3,697,500.00
B BAHAN
Balok kayu m3 1.2000 3,029,100.00 3,634,920.00
Paku 10 Cm Kg 1.2500 18,600.00 23,250.00
Lem kayu Kg 1.0000 18,800.00 18,800.00
JUMLAH HARGA BAHAN 3,676,970.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.3 Pembuatan dan pemasangan 1 m2 kusen klamp standar, kayu kelas II
SATUAN : M2
HARGA SATUAN : Rp 376,091
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 105,000.00 36,750.00
Tukang L.02 OH 1.0500 150,000.00 157,500.00
Kepala tukang L.03 OH 0.1050 175,000.00 18,375.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 215,775.00
B BAHAN
Papan kayu m3 0.0400 3,129,900.00 125,196.00
Paku 5 - 7 Cm Kg 0.0500 18,600.00 930.00
JUMLAH HARGA BAHAN 126,126.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.4 Pembuatan dan pemasangan 1 m2 kusen klamp sederhana, kayu kelas III
SATUAN : M2
HARGA SATUAN : Rp 352,014
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 105,000.00 36,750.00
Tukang L.02 OH 1.0500 150,000.00 157,500.00
Kepala tukang L.03 OH 0.1050 175,000.00 18,375.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 215,775.00
B BAHAN
Papan kayu m3 0.0400 2,582,700.00 103,308.00
Paku 5 - 7 Cm Kg 0.0500 18,600.00 930.00
JUMLAH HARGA BAHAN 104,238.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
SATUAN : M2
HARGA SATUAN : Rp 816,625
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang L.02 OH 3.0000 150,000.00 450,000.00
Kepala tukang L.03 OH 0.3000 175,000.00 52,500.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 616,250.00
B BAHAN
Papan kayu m3 0.0400 3,129,900.00 125,196.00
Lem kayu Kg 0.0500 18,800.00 940.00
JUMLAH HARGA BAHAN 126,136.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.6 Pembuatan dan Pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I dan II
SATUAN : M2
HARGA SATUAN : Rp 681,050
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 105,000.00 84,000.00
Tukang L.02 OH 2.4000 150,000.00 360,000.00
Kepala tukang L.03 OH 0.2400 175,000.00 42,000.00
Mandor L.04 OH 0.0400 175,000.00 7,000.00
JUMLAH TENAGA KERJA 493,000.00
B BAHAN
Papan kayu m3 0.0400 3,129,900.00 125,196.00
Lem kayu Kg 0.0500 18,800.00 940.00
JUMLAH HARGA BAHAN 126,136.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
SATUAN : M2
HARGA SATUAN : Rp 908,560
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang L.02 OH 3.0000 150,000.00 450,000.00
Kepala tukang L.03 OH 0.3000 175,000.00 52,500.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 616,250.00
B BAHAN
Papan kayu m3 0.0640 3,129,900.00 200,313.60
Lem kayu Kg 0.5000 18,800.00 9,400.00
JUMLAH HARGA BAHAN 209,713.60
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.8 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 Cm)
SATUAN : M2
HARGA SATUAN : Rp 663,609
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 105,000.00 73,500.00
Tukang L.02 OH 2.1000 150,000.00 315,000.00
Kepala tukang L.03 OH 0.2100 175,000.00 36,750.00
Mandor L.04 OH 0.0350 175,000.00 6,125.00
JUMLAH TENAGA KERJA 431,375.00
B BAHAN
Papan kayu m3 0.0250 3,129,900.00 78,247.50
Paku 1 Cm - 2,5 Cm Kg 0.0300 18,600.00 558.00
Lem kayu Kg 0.5000 18,800.00 9,400.00
plywood tebal 4 mm uk 90x220 Cm Lbr 1.0000 83,700.00 83,700.00
JUMLAH HARGA BAHAN 171,905.50
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.9 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
SATUAN : M2
HARGA SATUAN : Rp 733,462
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 105,000.00 84,000.00
Tukang L.02 OH 2.4000 150,000.00 360,000.00
Kepala tukang L.03 OH 0.2400 175,000.00 42,000.00
Mandor L.04 OH 0.0400 175,000.00 7,000.00
JUMLAH TENAGA KERJA 493,000.00
B BAHAN
Papan kayu m3 0.0256 3,129,900.00 80,125.44
Paku 1 Cm - 2,5 Cm Kg 0.0300 18,600.00 558.00
Lem kayu Kg 0.5000 18,800.00 9,400.00
plywood tebal 4 mm uk 90x220 Cm Lbr 1.0000 83,700.00 83,700.00
JUMLAH HARGA BAHAN 173,783.44
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 105,000.00 70,350.00
Tukang L.02 OH 2.0000 150,000.00 300,000.00
Kepala tukang L.03 OH 0.2000 175,000.00 35,000.00
Mandor L.04 OH 0.3350 175,000.00 58,625.00
JUMLAH TENAGA KERJA 463,975.00
B BAHAN
Papan kayu m3 0.0600 3,129,900.00 187,794.00
Paku 1 Cm - 2,5 Cm Kg 0.1500 18,600.00 2,790.00
JUMLAH HARGA BAHAN 190,584.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.11 Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I
SATUAN : M2
HARGA SATUAN : Rp 754,034
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 105,000.00 84,000.00
Tukang L.02 OH 2.4000 150,000.00 360,000.00
Kepala tukang L.03 OH 0.2400 175,000.00 42,000.00
Mandor L.04 OH 0.0400 175,000.00 7,000.00
JUMLAH TENAGA KERJA 493,000.00
B BAHAN
Papan kayu m3 0.0250 4,103,500.00 102,587.50
Paku 1 Cm - 2,5 Cm Kg 0.0300 18,600.00 558.00
Lem kayu Kg 0.3000 18,800.00 5,640.00
Teakwood 4 mm 90x220 Cm Lbr 1.0000 83,700.00 83,700.00
JUMLAH HARGA BAHAN 192,485.50
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.12 Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kls II
SATUAN : M2
HARGA SATUAN : Rp 829,725
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.8500 105,000.00 89,250.00
Tukang L.02 OH 2.5500 150,000.00 382,500.00
Kepala tukang L.03 OH 0.2550 175,000.00 44,625.00
Mandor L.04 OH 0.0430 175,000.00 7,525.00
JUMLAH TENAGA KERJA 523,900.00
B BAHAN
Papan kayu m3 0.0250 3,129,900.00 78,247.50
Paku 1 Cm - 2,5 Cm Kg 0.0300 18,600.00 558.00
Lem kayu Kg 0.8000 18,800.00 15,040.00
Teakwood 4 mm 90x220 Cm Lbr 1.0000 83,700.00 83,700.00
Formika Lbr 0.5000 105,700.00 52,850.00
JUMLAH HARGA BAHAN 230,395.50
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kls I, II dan III
SATUAN : M3
HARGA SATUAN : Err:509
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 105,000.00 420,000.00
Tukang L.02 OH 12.0000 150,000.00 1,800,000.00
Kepala tukang L.03 OH 1.2000 175,000.00 210,000.00
Mandor L.04 OH 0.2000 175,000.00 35,000.00
JUMLAH TENAGA KERJA 2,465,000.00
B BAHAN
Balok kayu m3 1.1000 3,029,100.00 3,332,010.00
Besi strip tebal 5 mm Kg 15.0000 Err:509 Err:509
Paku 12 Cm Kg 5.6000 18,600.00 104,160.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 6.7000 105,000.00 703,500.00
Tukang L.02 OH 20.1000 150,000.00 3,015,000.00
Kepala tukang L.03 OH 2.0100 175,000.00 351,750.00
Mandor L.04 OH 0.3350 175,000.00 58,625.00
JUMLAH TENAGA KERJA 4,128,875.00
B BAHAN
Balok kayu m3 1.2000 4,035,700.00 4,842,840.00
Besi strip tebal 5 mm Kg 15.0000 Err:509 Err:509
Paku 12 Cm Kg 5.6000 18,600.00 104,160.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 6.7000 105,000.00 703,500.00
Tukang L.02 OH 20.1000 150,000.00 3,015,000.00
Kepala tukang L.03 OH 2.0100 175,000.00 351,750.00
Mandor L.04 OH 0.3350 175,000.00 58,625.00
JUMLAH TENAGA KERJA 4,128,875.00
B BAHAN
Balok kayu m3 1.1000 3,029,100.00 3,332,010.00
Besi strip tebal 5 mm Kg 15.0000 Err:509 Err:509
Paku 12 Cm Kg 3.0000 18,600.00 55,800.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.16 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II
SATUAN : M2
HARGA SATUAN : Rp 202,653
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 28,125.00
B BAHAN
Kaso-kaso 5 x 7 Cm m3 0.0140 3,029,100.00 42,407.40
Reng 2 x 3 Cm m3 0.0360 3,029,100.00 109,047.60
Paku 5 dan 10 Cm Kg 0.2500 18,600.00 4,650.00
JUMLAH HARGA BAHAN 156,105.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.17 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II
SATUAN : M2
HARGA SATUAN : Rp 272,625
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 28,125.00
B BAHAN
Kaso-kaso 5 x 7 Cm m3 0.0140 3,029,100.00 42,407.40
Reng 2 x 3 Cm m3 0.0570 3,029,100.00 172,658.70
Paku 5 dan 10 Cm Kg 0.2500 18,600.00 4,650.00
JUMLAH HARGA BAHAN 219,716.10
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 105,000.00 12,600.00
Tukang L.02 OH 0.1200 150,000.00 18,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 33,750.00
B BAHAN
Kayu kelas II m3 0.0140 3,029,100.00 42,407.40
Paku 5 dan 10 Cm Kg 0.0570 18,600.00 1,060.20
JUMLAH HARGA BAHAN 43,467.60
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.19 Pemasangan 1 m2 rangka langit-langit (50 x 100) Cm, kayu kelas II atau III
SATUAN : M2
HARGA SATUAN : Rp 142,442
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.3000 150,000.00 45,000.00
Kepala tukang L.03 OH 0.0300 175,000.00 5,250.00
Mandor L.04 OH 0.0750 175,000.00 13,125.00
JUMLAH TENAGA KERJA 79,125.00
B BAHAN
Kaso-kaso 5 x 7 Cm m3 0.0154 3,029,100.00 46,648.14
Paku 7 dan 10 Cm Kg 0.2000 18,600.00 3,720.00
JUMLAH HARGA BAHAN 50,368.14
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.20 Pemasangan 1 m2 rangka langit-langit (60 x 60) Cm, kayu kelas II atau III
SATUAN : M2
HARGA SATUAN : Rp 139,727
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.3000 150,000.00 45,000.00
Kepala tukang L.03 OH 0.0300 175,000.00 5,250.00
Mandor L.04 OH 0.0100 175,000.00 1,750.00
JUMLAH TENAGA KERJA 73,000.00
B BAHAN
Kaso-kaso 5 x 7 Cm m3 0.0163 3,029,100.00 49,374.33
Paku 7 dan 10 Cm Kg 0.2500 18,600.00 4,650.00
JUMLAH HARGA BAHAN 54,024.33
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.21 Pemasangan 1 m2 rangka langit-langit (3 x 20) Cm, kayu kelas II atau III
SATUAN : M2
HARGA SATUAN : Rp 82,091
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 44,875.00
B BAHAN
Papan kayu m3 0.0108 2,582,700.00 27,893.16
Paku 7 dan 10 Cm Kg 0.1000 18,600.00 1,860.00
JUMLAH HARGA BAHAN 29,753.16
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 44,875.00
B BAHAN
lisplang GRC M1 1.1000 30,000.00 33,000.00
Paku 5 dan 10 Cm Kg 0.0500 18,600.00 930.00
JUMLAH HARGA BAHAN 33,930.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.23 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) Cm, kayu kelas II atau III
SATUAN : M2
HARGA SATUAN : Rp 180,199
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 92,525.00
B BAHAN
Balok kayu m3 0.0280 2,446,500.00 68,502.00
Paku 5 dan 10 Cm Kg 0.1500 18,600.00 2,790.00
JUMLAH HARGA BAHAN 71,292.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.24 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
SATUAN : M2
HARGA SATUAN : Rp 192,539
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 92,525.00
B BAHAN
Balok kayu 6 x 12 m3 0.0280 3,029,100.00 84,814.80
Paku 5 dan 10 Cm Kg 0.1500 18,600.00 2,790.00
Teakwood 4 mm, 120x240 Lbr 0.8600 83,700.00 71,982.00
Lem kayu Kg 0.5600 18,800.00 10,528.00
JUMLAH HARGA BAHAN 82,510.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.25 Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II
SATUAN : M2
HARGA SATUAN : Rp 226,336
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 105,000.00 21,000.00
Tukang L.02 OH 0.6000 150,000.00 90,000.00
Kepala tukang L.03 OH 0.0600 175,000.00 10,500.00
Mandor L.04 OH 0.0100 175,000.00 1,750.00
JUMLAH TENAGA KERJA 123,250.00
B BAHAN
Balok kayu 6 x 12 m3 0.0280 3,029,100.00 84,814.80
Paku 5 dan 10 Cm Kg 0.1500 18,600.00 2,790.00
Plywood 4 mm, 120x240 Lbr 0.8600 83,700.00 71,982.00
Lem kayu Kg 0.5600 18,800.00 10,528.00
JUMLAH HARGA BAHAN 82,510.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.26 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I
SATUAN : M2
HARGA SATUAN : Rp 409,794
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 105,000.00 63,000.00
Tukang L.02 OH 1.8000 150,000.00 270,000.00
Kepala tukang L.03 OH 0.1800 175,000.00 31,500.00
Mandor L.04 OH 0.0300 175,000.00 5,250.00
JUMLAH TENAGA KERJA 369,750.00
B BAHAN
Papan kayu m3 0.0070 4,103,500.00 28,724.50
Paku 5 dan 10 Cm Kg 0.1000 18,600.00 1,860.00
Paku skrup 10 Cm Kg 0.1500 18,600.00 2,790.00
JUMLAH HARGA BAHAN 2,790.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.27 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120x240) Cm
SATUAN : M2
HARGA SATUAN : Rp 54,846
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 105,000.00 2,625.00
Tukang L.02 OH 0.0750 150,000.00 11,250.00
Kepala tukang L.03 OH 0.0080 175,000.00 1,400.00
Mandor L.04 OH 0.0010 175,000.00 175.00
JUMLAH TENAGA KERJA 15,450.00
B BAHAN
Plywood 4 mm m3 0.4000 83,700.00 33,480.00
Paku 5 dan 10 Cm Kg 0.0500 18,600.00 930.00
JUMLAH HARGA BAHAN 34,410.00
C PERALATAN
JENIS PEKERJAAN : A.4.6.1.28 Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV
SATUAN : M2
HARGA SATUAN : Rp 96,682
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.0500 150,000.00 7,500.00
Kepala tukang L.03 OH 0.0050 175,000.00 875.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 19,750.00
B BAHAN
Bilik bambu m2 1.5000 17,000.00 25,500.00
Kaso-kaso 5 x 7 m3 0.0140 3,029,100.00 42,407.40
Paku Kg 0.0120 18,600.00 223.20
List kayu 2/4 m3 0.0030 4,000.00 12.00
JUMLAH HARGA BAHAN 68,142.60
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 105,000.00 6,300.00
Tukang L.02 OH 0.6000 150,000.00 90,000.00
Kepala tukang L.03 OH 0.0600 175,000.00 10,500.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 107,325.00
B BAHAN
Kunci tanam antik set 1.0000 274,200.00 274,200.00
JUMLAH HARGA BAHAN 274,200.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 105,000.00 1,050.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 85,675.00
B BAHAN
Kunci tanam biasa Bh 1.0000 91,700.00 91,700.00
JUMLAH HARGA BAHAN 91,700.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0050 105,000.00 525.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 84,800.00
B BAHAN
Kunci tanam KM Bh 1.0000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0050 105,000.00 525.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 84,800.00
B BAHAN
Kunci silinder Bh 1.0000 85,000.00 85,000.00
JUMLAH HARGA BAHAN 85,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 105,000.00 1,575.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0008 175,000.00 140.00
JUMLAH TENAGA KERJA 26,840.00
B BAHAN
Engsel pintu Bh 1.0000 22,600.00 22,600.00
JUMLAH HARGA BAHAN 22,600.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 105,000.00 1,050.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0005 175,000.00 87.50
JUMLAH TENAGA KERJA 17,887.50
B BAHAN
Engsel kupu-kupu Bh 1.0000 14,900.00 14,900.00
JUMLAH HARGA BAHAN 14,900.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0005 175,000.00 87.50
JUMLAH TENAGA KERJA 44,087.50
B BAHAN
Engsel angin Bh 1.0000 14,900.00 14,900.00
JUMLAH HARGA BAHAN 14,900.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 105,000.00 1,575.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 28,100.00
B BAHAN
Spring knip Bh 1.0000 65,000.00 65,000.00
JUMLAH HARGA BAHAN 65,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 105,000.00 1,575.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 28,100.00
B BAHAN
Kait angin Bh 1.0000 15,200.00 15,200.00
JUMLAH HARGA BAHAN 15,200.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 105,000.00 5,250.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 89,525.00
B BAHAN
Door closer Bh 1.0000 225,000.00 225,000.00
JUMLAH HARGA BAHAN 225,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 105,000.00 2,100.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0010 175,000.00 175.00
JUMLAH TENAGA KERJA 35,775.00
B BAHAN
Kunci slot Bh 1.0000 91,700.00 91,700.00
JUMLAH HARGA BAHAN 91,700.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 105,000.00 5,250.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 89,525.00
B BAHAN
Door holder Bh 1.0000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 105,000.00 1,050.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 18,675.00
B BAHAN
Door stop Bh 1.0000 72,500.00 72,500.00
JUMLAH HARGA BAHAN 72,500.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 105,000.00 6,300.00
Tukang L.02 OH 0.6000 150,000.00 90,000.00
Kepala tukang L.03 OH 0.0600 175,000.00 10,500.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 107,325.00
B BAHAN
Rel pintu sorong Set 1.0000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 105,000.00 2,625.00
Tukang L.02 OH 0.2500 150,000.00 37,500.00
Kepala tukang L.03 OH 0.0250 175,000.00 4,375.00
Mandor L.04 OH 0.0013 175,000.00 227.50
JUMLAH TENAGA KERJA 44,727.50
B BAHAN
Kunci lemari Set 1.0000 22,500.00 22,500.00
JUMLAH HARGA BAHAN 22,500.00
C PERALATAN
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 67,227.50
E Overhead & profit 10% x Jumlah 6,722.75
F Harga Satuan Pekerjaan (D+E) 73,950.25
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 105,000.00 1,575.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0008 175,000.00 140.00
JUMLAH TENAGA KERJA 26,840.00
B BAHAN
Kaca tebal 3 mm m2 1.1000 94,900.00 104,390.00
Sealant Kg 0.0500 35,000.00 1,750.00
JUMLAH HARGA BAHAN 106,140.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 105,000.00 1,575.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0008 175,000.00 140.00
JUMLAH TENAGA KERJA 26,840.00
B BAHAN
Kaca tebal 5 mm m2 1.1000 105,700.00 116,270.00
Sealant Kg 0.0500 35,000.00 1,750.00
JUMLAH HARGA BAHAN 118,020.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0170 105,000.00 1,785.00
Tukang L.02 OH 0.1700 150,000.00 25,500.00
Kepala tukang L.03 OH 0.0170 175,000.00 2,975.00
Mandor L.04 OH 0.0009 175,000.00 157.50
JUMLAH TENAGA KERJA 30,417.50
B BAHAN
Kaca tebal 8 mm m2 1.1000 208,400.00 229,240.00
Sealant Kg 0.0700 35,000.00 2,450.00
JUMLAH HARGA BAHAN 231,690.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0250 105,000.00 2,625.00
Tukang L.02 OH 0.2500 150,000.00 37,500.00
Kepala tukang L.03 OH 0.0250 175,000.00 4,375.00
Mandor L.04 OH 0.0013 175,000.00 227.50
JUMLAH TENAGA KERJA 44,727.50
B BAHAN
Kaca buram 12 mm m2 1.1000 a #VALUE!
Sealant Kg 0.0700 35,000.00 2,450.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 105,000.00 1,575.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 28,100.00
B BAHAN
Kaca cermin 5 mm m2 1.1000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0170 105,000.00 1,785.00
Tukang L.02 OH 0.1700 150,000.00 25,500.00
Kepala tukang L.03 OH 0.0170 175,000.00 2,975.00
Mandor L.04 OH 0.0090 175,000.00 1,575.00
JUMLAH TENAGA KERJA 31,835.00
B BAHAN
Kaca cermin 8 mm m2 1.1000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 105,000.00 1,575.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 28,100.00
B BAHAN
Kaca wireglassed 5 mm m2 1.1000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) #VALUE!
E Overhead & profit 10% x Jumlah #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0750 105,000.00 7,875.00
Tukang L.02 OH 0.1500 150,000.00 22,500.00
Kepala tukang L.03 OH 0.0150 175,000.00 2,625.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 33,700.00
B BAHAN
Kaca patri 5 mm m2 1.1000 a #VALUE!
Sealant Kg 0.0500 35,000.00 1,750.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 16,275.00
B BAHAN
Soda api Kg 0.0500 27,000.00 1,350.00
JUMLAH HARGA BAHAN 1,350.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.2 Pencucian bidang permukaan tembok yang perna dicat
SATUAN : M2
HARGA SATUAN : Rp 18,233
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 16,275.00
B BAHAN
Sabun Kg 0.0500 6,000.00 300.00
JUMLAH HARGA BAHAN 300.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.3 Pengerokan karat pada permukaan baja cara manual
SATUAN : M2
HARGA SATUAN : Rp 19,195
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 17,150.00
B BAHAN
Sabun Kg 0.0500 6,000.00 300.00
JUMLAH HARGA BAHAN 300.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.4 Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,2 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 49,820
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 105,000.00 7,350.00
Tukang L.02 OH 0.0090 150,000.00 1,350.00
Kepala tukang L.03 OH 0.0060 175,000.00 1,050.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 10,275.00
B BAHAN
Cat menie Kg 0.2000 30,700.00 6,140.00
Plamuur Kg 0.1500 28,700.00 4,305.00
Cat dasar Kg 0.1700 45,000.00 7,650.00
Cat penutup Kg 0.2600 55,500.00 14,430.00
Kuas Bh 0.0100 20,700.00 207.00
Pengencer ltr 0.0300 14,800.00 444.00
Ampelas Lbr 0.2000 9,200.00 1,840.00
JUMLAH HARGA BAHAN 35,016.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.5 Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,3 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 70,770
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 105,000.00 7,350.00
Tukang L.02 OH 0.1050 150,000.00 15,750.00
Kepala tukang L.03 OH 0.0040 175,000.00 700.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 24,325.00
B BAHAN
Cat menie Kg 0.2000 30,700.00 6,140.00
Plamuur Kg 0.1500 28,700.00 4,305.00
Cat dasar Kg 0.1700 45,000.00 7,650.00
Cat penutup Kg 0.3500 55,500.00 19,425.00
Kuas Bh 0.0100 20,700.00 207.00
Pengencer Kg 0.0300 14,800.00 444.00
Ampelas Lbr 0.2000 9,200.00 1,840.00
JUMLAH HARGA BAHAN 40,011.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0400 105,000.00 4,200.00
Tukang L.02 OH 0.0630 150,000.00 9,450.00
Kepala tukang L.03 OH 0.0630 175,000.00 11,025.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 25,200.00
B BAHAN
Teak oil L 0.3600 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 105,000.00 4,200.00
Tukang L.02 OH 0.0600 150,000.00 9,000.00
Kepala tukang L.03 OH 0.0160 175,000.00 2,800.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 16,525.00
B BAHAN
Politur L 0.1500 61,100.00 9,165.00
Politur jadi L 0.3720 61,100.00 22,729.20
Ampelas Lbr 2.0000 9,200.00 18,400.00
JUMLAH HARGA BAHAN 50,294.20
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.8 Peleburan 1 m2 bidang kayu dengan cat residu dan ter
SATUAN : M2
HARGA SATUAN : Rp 25,795
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 105,000.00 10,500.00
Mandor L.04 OH 0.0060 175,000.00 1,050.00
JUMLAH TENAGA KERJA 11,550.00
B BAHAN
Residu atau ter L 0.3500 34,000.00 11,900.00
JUMLAH HARGA BAHAN 11,900.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1600 105,000.00 16,800.00
Tukang L.02 OH 0.1600 150,000.00 24,000.00
Kepala tukang L.03 OH 0.0160 175,000.00 2,800.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 44,125.00
B BAHAN
Vernis L 0.1500 93,100.00 13,965.00
Dempul Kg 0.0500 26,200.00 1,310.00
Ampelas Lbr 0.1000 9,200.00 920.00
JUMLAH HARGA BAHAN 16,195.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.10 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 35,494
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 105,000.00 2,100.00
Tukang L.02 OH 0.0630 150,000.00 9,450.00
Kepala tukang L.03 OH 0.0063 175,000.00 1,102.50
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 13,177.50
B BAHAN
Plamuur Kg 0.1000 31,800.00 3,180.00
Cat dasar Kg 0.1000 25,200.00 2,520.00
Cat penutup Kg 0.2600 51,500.00 13,390.00
JUMLAH HARGA BAHAN 19,090.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.11 Pengecatan 1 m2 tembok lama dinding dalam jotun Interior (1 lapis Alkalir, 2 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 23,034
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 105,000.00 2,940.00
Tukang L.02 OH 0.0420 150,000.00 6,300.00
Kepala tukang L.03 OH 0.0042 175,000.00 735.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 10,500.00
B BAHAN
Cat dasar ( Alkali ) Kg 0.1200 45,000.00 5,400.00
Cat penutup ( Jotun Interior ) Kg 0.1800 28,000.00 5,040.00
JUMLAH HARGA BAHAN 10,440.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.11.a Pengecatan 1 m2 tembok lama dinding Luar jotun Exterior (1 lapis Alkalir, 2 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 35,310
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 105,000.00 2,940.00
Tukang L.02 OH 0.0420 150,000.00 6,300.00
Kepala tukang L.03 OH 0.0042 175,000.00 735.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 10,500.00
B BAHAN
Cat dasar ( Alkali ) Kg 0.1200 45,000.00 5,400.00
Cat penutup ( Jotun Exterior ) Kg 0.1800 90,000.00 16,200.00
JUMLAH HARGA BAHAN 21,600.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0280 105,000.00 2,940.00
Tukang L.02 OH 0.0420 150,000.00 6,300.00
Kepala tukang L.03 OH 0.0042 175,000.00 735.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 10,500.00
B BAHAN
Kalkarium Kg 0.1000 a #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Tukang L.02 OH 0.0010 150,000.00 150.00
Kepala tukang L.03 OH 0.0001 175,000.00 17.50
Mandor L.04 OH 0.0025 175,000.00 437.50
JUMLAH TENAGA KERJA 16,355.00
B BAHAN
Kapur sirih Kg 0.1500 a #VALUE!
Ampelas Lbr 0.1000 9,200.00 920.00
Kuas bh 0.2500 20,700.00 5,175.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.14 Peleburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)
SATUAN : M2
HARGA SATUAN : #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 105,000.00 4,200.00
Tukang L.02 OH 0.0050 150,000.00 750.00
Kepala tukang L.03 OH 0.0005 175,000.00 87.50
Mandor L.04 OH 0.0025 175,000.00 437.50
JUMLAH TENAGA KERJA 5,475.00
B BAHAN
Kapur sirih Kg 0.3000 a #VALUE!
Ampelas Lbr 0.2000 9,200.00 1,840.00
Kuas bh 0.2500 20,700.00 5,175.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 105,000.00 2,100.00
Tukang L.02 OH 0.2000 150,000.00 30,000.00
Kepala tukang L.03 OH 0.0200 175,000.00 3,500.00
Mandor L.04 OH 0.0025 175,000.00 437.50
JUMLAH TENAGA KERJA 36,037.50
B BAHAN
Menie besi Kg 0.1000 40,300.00 4,030.00
Kuas Lbr 0.0100 20,700.00 207.00
JUMLAH HARGA BAHAN 4,237.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.17 Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah
SATUAN : M2
HARGA SATUAN : Rp 76,599
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.2250 150,000.00 33,750.00
Kepala tukang L.03 OH 0.0225 175,000.00 3,937.50
Mandor L.04 OH 0.0075 175,000.00 1,312.50
JUMLAH TENAGA KERJA 65,250.00
B BAHAN
Menie besi Kg 0.1000 40,300.00 4,030.00
Pengencer L 0.0100 14,800.00 148.00
Kuas Bh 0.0100 20,700.00 207.00
Perancah kayu m3 0.0020 - -
JUMLAH HARGA BAHAN 4,385.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.18 Pengecatan 1 m2 permukaan Baja / Galvanis secara manual 4 lapis
SATUAN : M2
HARGA SATUAN : Rp 89,055
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 105,000.00 26,250.00
Tukang L.02 OH 0.2500 150,000.00 37,500.00
Kepala tukang L.03 OH 0.0250 175,000.00 4,375.00
Mandor L.04 OH 0.0013 175,000.00 227.50
JUMLAH TENAGA KERJA 68,352.50
B BAHAN
Menie A Kg 0.1000 40,300.00 4,030.00
Menie B Kg 0.1000 40,300.00 4,030.00
Cat Minyak Kg 0.0800 52,400.00 4,192.00
Kuas Bh 0.0100 20,700.00 207.00
Pengencer L 0.0100 14,800.00 148.00
JUMLAH HARGA BAHAN 12,607.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.19 Pengecatan 1 m2 permukaan Baja / Galvanis secara manual sistem 1 lapis cat mutakhir
SATUAN : M2
HARGA SATUAN : 37,400.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 105,000.00 6,300.00
Tukang L.02 OH 0.0600 150,000.00 9,000.00
Kepala tukang L.03 OH 0.0120 175,000.00 2,100.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 17,925.00
B BAHAN
Cat Minyak Kg 0.3000 52,400.00 15,720.00
Kuas Bh 0.0100 20,700.00 207.00
Pengencer L 0.0100 14,800.00 148.00
JUMLAH HARGA BAHAN 16,075.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.20 Pengecatan 1 m2 permukaan Baja / Galvanis secara manual sistem 3 lapis
SATUAN : M2
HARGA SATUAN : Rp 220,772.20
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 105,000.00 42,000.00
Tukang L.02 OH 0.8000 150,000.00 120,000.00
Kepala tukang L.03 OH 0.0800 175,000.00 14,000.00
Mandor L.04 OH 0.0200 175,000.00 3,500.00
JUMLAH TENAGA KERJA 179,500.00
B BAHAN
Cat dasar Kg 0.1100 37,200.00 4,092.00
Cat antara Kg 0.1700 73,900.00 12,563.00
Cat penutup Kg 0.0800 52,400.00 4,192.00
Kuas Bh 0.0100 20,700.00 207.00
Pengencer L 0.0100 14,800.00 148.00
JUMLAH HARGA BAHAN 21,202.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.21 Pengecatan 1 m2 permukaan Baja / Galvanis secara semprot sistem 3 lapis
SATUAN : M2
HARGA SATUAN : Rp 191,463.80
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 105,000.00 42,000.00
Tukang L.02 OH 0.7000 150,000.00 105,000.00
Kepala tukang L.03 OH 0.0700 175,000.00 12,250.00
Mandor L.04 OH 0.0200 175,000.00 3,500.00
JUMLAH TENAGA KERJA 162,750.00
B BAHAN
Cat dasar Kg 0.3000 37,200.00 11,160.00
Pengencer L 0.0100 14,800.00 148.00
JUMLAH HARGA BAHAN 11,308.00
C PERALATAN
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 174,058.00
E Overhead & profit 10% x Jumlah 17,405.80
F Harga Satuan Pekerjaan (D+E) 191,463.80
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 2.0000 105,000.00 210,000.00
Tukang L.02 OH 12.0000 150,000.00 1,800,000.00
Kepala tukang L.03 OH 1.2000 175,000.00 210,000.00
Mandor L.04 OH 0.1000 175,000.00 17,500.00
JUMLAH TENAGA KERJA 2,237,500.00
B BAHAN
Wood Filler kg 1.5000 a #VALUE!
Woodstain kg 1.5000 a #VALUE!
Sanding kg 1.5000 a #VALUE!
Melamic L 2.4000 a #VALUE!
Thinner Lbr 2.0000 17,300.00 34,600.00
Amplas Lbr 6.0000 14,800.00 88,800.00
JUMLAH HARGA BAHAN 123,400.00
C PERALATAN
Compressor jam a a #VALUE!
JUMLAH HARGA ALAT #VALUE!
D JUMLAH (A+B+C) #VALUE!
E Overhead & profit 10% x Jumlah #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 105,000.00 15,750.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 16,275.00
B BAHAN
Gundar Kawat Bh 0.1800 7,500.00 1,350.00
JUMLAH HARGA BAHAN 1,350.00
C PERALATAN
JENIS PEKERJAAN : A.4.7.1.5 Pengecatan Ulang Kerb Beton (1 lapis cat dasar, 2 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 40,346
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0420 105,000.00 4,410.00
Tukang L.02 OH 0.0630 175,000.00 11,025.00
Kepala tukang L.03 OH 0.0040 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA 15,435.00
B BAHAN
Cat Dasar Kg 0.1020 52,400.00 5,344.80
Plamuur Kg 0.1500 - -
Cat Penutup (Hitam) Kg 0.1167 52,400.00 6,115.08
Cat Penutup (Putih) Kg 0.1167 67,000.00 7,818.90
Kuas Bh 0.0060 18,300.00 109.80
Pengencer (Thinner) Kg 0.0180 19,700.00 354.60
Ampelas Lbr 0.2000 7,500.00 1,500.00
JUMLAH HARGA BAHAN 21,243.18
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 3.3000 105,000.00 346,500.00
Tukang L.02 OH 1.1000 150,000.00 165,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.1600 175,000.00 28,000.00
JUMLAH TENAGA KERJA 541,250.00
B BAHAN
Closet duduk Unit 1.0000 1,899,600.00 1,899,600.00
Perlengkapan Ls 0.0600 1,899,600.00 113,976.00
JUMLAH HARGA BAHAN 2,013,576.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang L.02 OH 1.5000 150,000.00 225,000.00
Kepala tukang L.03 OH 0.1500 175,000.00 26,250.00
Mandor L.04 OH 0.1600 175,000.00 28,000.00
JUMLAH TENAGA KERJA 384,250.00
B BAHAN
Closet jongkok Unit 1.0000 325,000.00 325,000.00
Semen Portland Kg 6.0000 1,240.00 7,440.00
Pasir Pasang m3 0.0100 176,600.00 1,766.00
JUMLAH HARGA BAHAN 334,206.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang L.02 OH 1.5000 150,000.00 225,000.00
Kepala tukang L.03 OH 0.1500 175,000.00 26,250.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 365,000.00
B BAHAN
Closet jongkok Unit 1.0000 250,000.00 250,000.00
Semen Portland Kg 6.0000 1,240.00 7,440.00
Pasir Pasang m3 0.0100 176,600.00 1,766.00
Bata Merah Bh 7.0000 700.00 4,900.00
JUMLAH HARGA BAHAN 264,106.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.0000 105,000.00 105,000.00
Tukang L.02 OH 1.0000 150,000.00 150,000.00
Kepala tukang L.03 OH 0.1000 175,000.00 17,500.00
Mandor L.04 OH 0.0500 175,000.00 8,750.00
JUMLAH TENAGA KERJA 281,250.00
B BAHAN
Urinoir Unit 1.0000 1,882,500.00 1,882,500.00
Semen Portland Kg 6.0000 1,240.00 7,440.00
Pasir Pasang m3 0.0100 176,600.00 1,766.00
Perlengkapan % 30.0000 1,891,706.00 567,511.8000
JUMLAH HARGA BAHAN 2,459,217.80
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 105,000.00 126,000.00
Tukang L.02 OH 1.4500 150,000.00 217,500.00
Kepala tukang L.03 OH 0.1500 175,000.00 26,250.00
Mandor L.04 OH 0.0600 175,000.00 10,500.00
JUMLAH TENAGA KERJA 380,250.00
B BAHAN
Wastafel Unit 1.2000 870,700.00 1,044,840.00
Semen Portland Kg 6.0000 1,240.00 7,440.00
Pasir Pasang m3 0.0100 176,600.00 1,766.00
Perlengkapan % 12.0000 870,700.00 104,484.00
JUMLAH HARGA BAHAN 1,158,530.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0750 105,000.00 7,875.00
Tukang L.02 OH 0.7500 150,000.00 112,500.00
Kepala tukang L.03 OH 0.0750 175,000.00 13,125.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 134,025.00
B BAHAN
Bathcuip Unit 1.0000 3,950,000.00 3,950,000.00
Perlengkapan % 20.0000 3,950,000.00 790,000.00
JUMLAH HARGA BAHAN 4,740,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 105,000.00 315,000.00
Tukang L.02 OH 4.5000 150,000.00 675,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.9000 175,000.00 157,500.00
JUMLAH TENAGA KERJA 1,156,250.00
B BAHAN
Bak fibreglass Unit 1.0000 520,800.00 520,800.00
Perlengkapan % 12.0000 520,800.00 62,496.00
JUMLAH HARGA BAHAN 583,296.00
C PERALATAN
JENIS PEKERJAAN : A.5.1.1.8 Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
SATUAN : Bh
HARGA SATUAN : #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 105,000.00 630,000.00
Tukang L.02 OH 3.0000 150,000.00 450,000.00
Kepala tukang L.03 OH 0.3000 175,000.00 52,500.00
Mandor L.04 OH 0.0300 175,000.00 5,250.00
JUMLAH TENAGA KERJA 1,137,750.00
B BAHAN
Bata Merah m3 150.0000 700.00 105,000.00
Semen Portland Kg 120.0000 1,240.00 148,800.00
Pasir Pasang m3 0.3000 176,600.00 52,980.00
Porselen 11 x 11 cm bh 360.0000 a #VALUE!
Semen warna (tepung affa) Kg 6.0000 10,700.00 64,200.00
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
JENIS PEKERJAAN : A.5.1.1.9 Pemasangan 1 buah bak mandi teraso vol 0,30 m3
SATUAN : Bh
HARGA SATUAN : Rp 1,604,515.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 105,000.00 315,000.00
Tukang L.02 OH 4.5000 150,000.00 675,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.9000 175,000.00 157,500.00
JUMLAH TENAGA KERJA 1,156,250.00
B BAHAN
Bak fiberglass Unit 1.0000 270,000.00 270,000.00
Perlengkapan Ls 12.0000 270,000.00 32,400.00
JUMLAH HARGA BAHAN 302,400.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 105,000.00 31,500.00
Tukang L.02 OH 0.4500 150,000.00 67,500.00
Kepala tukang L.03 OH 0.0450 175,000.00 7,875.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 109,500.00
B BAHAN
Bak fibreglass Unit 1.0000 520,800.00 520,800.00
Perlengkapan % 12.0000 520,800.00 62,496.00
JUMLAH HARGA BAHAN 583,296.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 3.5000 105,000.00 367,500.00
Tukang L.02 OH 4.5000 150,000.00 675,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0180 175,000.00 3,150.00
JUMLAH TENAGA KERJA 1,054,400.00
B BAHAN
Beton 1:2:3 m3 0.9000 1,115,285.00 1,003,756.50
Besi Beton Kg 180.0000 10,100.00 1,818,000.00
Kayu bekisting m2 8.0000 51,654.00 413,232.00
Ubin porselen bh 500.0000 a #VALUE!
Perlengkapan % 10.0000 #VALUE! #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 105,000.00 3,150.00
Tukang L.02 OH 0.3000 150,000.00 45,000.00
Kepala tukang L.03 OH 0.0300 175,000.00 5,250.00
Mandor L.04 OH 0.0150 175,000.00 2,625.00
JUMLAH TENAGA KERJA 56,025.00
B BAHAN
Bak cuci piring Unit 1.0000 250,000.00 250,000.00
Waterdrain Bh 1.0000 200,000.00 200,000.00
JUMLAH HARGA BAHAN 450,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 105,000.00 5,250.00
Tukang L.02 OH 0.5000 150,000.00 75,000.00
Kepala tukang L.03 OH 0.0500 175,000.00 8,750.00
Mandor L.04 OH 0.0250 175,000.00 4,375.00
JUMLAH TENAGA KERJA 93,375.00
B BAHAN
Bak cuci piring Unit 1.0000 250,000.00 250,000.00
Waterdrain Bh 1.0000 200,000.00 200,000.00
Semen Portland Kg 20.0000 1,240.00 24,800.00
Pasir Pasang m3 0.0500 176,600.00 8,830.00
JUMLAH HARGA BAHAN 483,630.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 105,000.00 1,050.00
Tukang L.02 OH 0.1000 150,000.00 15,000.00
Kepala tukang L.03 OH 0.0100 175,000.00 1,750.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 18,675.00
B BAHAN
Floor Drain Unit 1.0000 128,800.00 128,800.00
JUMLAH HARGA BAHAN 128,800.00
C PERALATAN
JENIS PEKERJAAN : A.5.1.1.15 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 Cm
SATUAN : Bh
HARGA SATUAN : Rp 531,517.80
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 2.1600 105,000.00 226,800.00
Tukang L.02 OH 0.7200 150,000.00 108,000.00
Kepala tukang L.03 OH 0.0720 175,000.00 12,600.00
Mandor L.04 OH 0.0110 175,000.00 1,925.00
JUMLAH TENAGA KERJA 349,325.00
B BAHAN
Bata Merah bh 40.0000 700.00 28,000.00
Semen Portland kg 44.0000 1,240.00 54,560.00
Pasir Pasang m3 0.0700 176,600.00 12,362.00
Pasir beton m3 0.0600 176,500.00 10,590.00
Kerikil m3 0.0700 174,300.00 12,201.00
Baja bertulang kg 1.6000 10,100.00 16,160.00
JUMLAH HARGA BAHAN 133,873.00
C PERALATAN
JENIS PEKERJAAN : A.5.1.1.16 Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 Cm
SATUAN : Bh
HARGA SATUAN : Rp 798,923.40
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 3.2000 105,000.00 336,000.00
Tukang L.02 OH 1.1500 150,000.00 172,500.00
Kepala tukang L.03 OH 0.0110 175,000.00 1,925.00
Mandor L.04 OH 0.0160 175,000.00 2,800.00
JUMLAH TENAGA KERJA 513,225.00
B BAHAN
Bata Merah bh 70.0000 700.00 49,000.00
Semen Portland kg 77.0000 1,240.00 95,480.00
Pasir Pasang m3 0.1300 176,600.00 22,958.00
Pasir beton m3 0.0900 176,500.00 15,885.00
Kerikil m3 0.0200 174,300.00 3,486.00
Baja bertulang kg 2.6000 10,100.00 26,260.00
JUMLAH HARGA BAHAN 213,069.00
C PERALATAN
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 726,294.00
E Overhead & profit 10% x Jumlah 72,629.40
F Harga Satuan Pekerjaan (D+E) 798,923.40
JENIS PEKERJAAN : A.5.1.1.17 Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 Cm
SATUAN : Bh
HARGA SATUAN : Rp 934,005.93
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 3.2000 105,000.00 336,000.00
Tukang L.02 OH 1.1500 150,000.00 172,500.00
Kepala tukang L.03 OH 0.0110 175,000.00 1,925.00
Mandor L.04 OH 0.0160 175,000.00 2,800.00
JUMLAH TENAGA KERJA 513,225.00
B BAHAN
Bata Merah bh 123.0000 700.00 86,100.00
Semen Portland kg 114.0000 1,240.00 141,360.00
Pasir Pasang m3 0.1840 176,600.00 32,494.40
Pasir beton m3 0.1200 176,500.00 21,180.00
Kerikil m3 0.0330 174,300.00 5,751.90
Baja bertulang kg 4.8500 10,100.00 48,985.00
JUMLAH HARGA BAHAN 335,871.30
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 105,000.00 5,670.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0270 175,000.00 4,725.00
JUMLAH TENAGA KERJA 25,470.00
B BAHAN
Pipa galvanis 1/2" m 1.2000 28,300.00 33,960.00
Perlengkapan Ls 35.0000 33,960.00 11,886.00
JUMLAH HARGA BAHAN 45,846.00
C PERALATAN
JENIS PEKERJAAN : A.5.1.1.19 Pemasangan 1 buah kran diameter 1/2" atau 3/4"
SATUAN : M1
HARGA SATUAN : Rp 142,092.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 105,000.00 1,050.00
Tukang L.02 OH 0.4000 150,000.00 60,000.00
Kepala tukang L.03 OH 0.0400 175,000.00 7,000.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 68,925.00
B BAHAN
Kran Air stainless m 1.0000 60,000.00 60,000.00
Sealtape Bh 0.0250 10,000.00 250.00
JUMLAH HARGA BAHAN 60,250.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 105,000.00 5,670.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0270 175,000.00 4,725.00
JUMLAH TENAGA KERJA 25,470.00
B BAHAN
Pipa galvanis 3/4" m 1.2000 36,500.00 43,800.00
Perlengkapan % 35.0000 43,800.00 15,330.00
JUMLAH HARGA BAHAN 59,130.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 105,000.00 5,670.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0270 175,000.00 4,725.00
JUMLAH TENAGA KERJA 25,470.00
B BAHAN
Pipa galvanis 1" m 1.2000 39,000.00 46,800.00
Perlengkapan % 35.0000 46,800.00 16,380.00
JUMLAH HARGA BAHAN 63,180.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1080 105,000.00 11,340.00
Tukang L.02 OH 0.1800 150,000.00 27,000.00
Kepala tukang L.03 OH 0.0180 175,000.00 3,150.00
Mandor L.04 OH 0.0050 175,000.00 875.00
JUMLAH TENAGA KERJA 42,365.00
B BAHAN
Pipa galvanis 1 1/2" m 1.2000 55,900.00 67,080.00
Perlengkapan % 35.0000 67,080.00 23,478.00
JUMLAH HARGA BAHAN 90,558.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 105,000.00 14,175.00
Tukang L.02 OH 0.2250 150,000.00 33,750.00
Kepala tukang L.03 OH 0.0230 175,000.00 4,025.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 53,175.00
B BAHAN
Pipa galvanis 3" m 1.2000 190,600.00 228,720.00
Perlengkapan % 35.0000 228,720.00 80,052.00
JUMLAH HARGA BAHAN 308,772.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 105,000.00 14,175.00
Tukang L.02 OH 0.2250 150,000.00 33,750.00
Kepala tukang L.03 OH 0.0230 175,000.00 4,025.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 53,175.00
B BAHAN
Pipa galvanis 4" m 1.2000 276,200.00 331,440.00
Perlengkapan % 35.0000 331,440.00 116,004.00
JUMLAH HARGA BAHAN 447,444.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 105,000.00 3,780.00
Tukang L.02 OH 0.0600 150,000.00 9,000.00
Kepala tukang L.03 OH 0.0060 175,000.00 1,050.00
Mandor L.04 OH 0.0020 175,000.00 350.00
JUMLAH TENAGA KERJA 14,180.00
B BAHAN
Pipa PVC 1/2" M 1.2000 7,300.00 8,760.00
Perlengkapan % 35.0000 8,760.00 3,066.00
JUMLAH HARGA BAHAN 11,826.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 105,000.00 3,780.00
Tukang L.02 OH 0.0600 150,000.00 9,000.00
Kepala tukang L.03 OH 0.0060 175,000.00 1,050.00
Mandor L.04 OH 0.0020 175,000.00 350.00
JUMLAH TENAGA KERJA 14,180.00
B BAHAN
Pipa PVC 3/4" m 1.2000 9,200.00 11,040.00
Perlengkapan % 35.0000 11,040.00 3,864.00
JUMLAH HARGA BAHAN 14,904.00
C PERALATAN
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 29,084.00
E Overhead & profit 10% x Jumlah 2,908.40
F Harga Satuan Pekerjaan (D+E) 31,992.40
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 105,000.00 3,780.00
Tukang L.02 OH 0.0600 150,000.00 9,000.00
Kepala tukang L.03 OH 0.0060 175,000.00 1,050.00
Mandor L.04 OH 0.0020 175,000.00 350.00
JUMLAH TENAGA KERJA 14,180.00
B BAHAN
Pipa PVC 1" m 1.2000 10,300.00 12,360.00
Perlengkapan % 35.0000 12,360.00 4,326.00
JUMLAH HARGA BAHAN 16,686.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 105,000.00 5,670.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 21,270.00
B BAHAN
Pipa PVC 1½" m 1.2000 15,700.00 18,840.00
Perlengkapan % 35.0000 18,840.00 6,594.00
JUMLAH HARGA BAHAN 25,434.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 105,000.00 5,670.00
Tukang L.02 OH 0.0900 150,000.00 13,500.00
Kepala tukang L.03 OH 0.0090 175,000.00 1,575.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 21,270.00
B BAHAN
Pipa PVC 2" m 1.2000 19,800.00 23,760.00
Perlengkapan % 35.0000 23,760.00 8,316.00
JUMLAH HARGA BAHAN 32,076.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 105,000.00 8,505.00
Tukang L.02 OH 0.1350 150,000.00 20,250.00
Kepala tukang L.03 OH 0.0135 175,000.00 2,362.50
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 31,817.50
B BAHAN
Pipa PVC 2½" m 1.2000 26,400.00 31,680.00
Perlengkapan % 35.0000 31,680.00 11,088.00
JUMLAH HARGA BAHAN 42,768.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 105,000.00 8,505.00
Tukang L.02 OH 0.1350 150,000.00 20,250.00
Kepala tukang L.03 OH 0.0135 175,000.00 2,362.50
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 31,817.50
B BAHAN
Pipa PVC 3" m 1.2000 35,200.00 42,240.00
Perlengkapan % 35.0000 42,240.00 14,784.00
JUMLAH HARGA BAHAN 57,024.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 105,000.00 8,505.00
Tukang L.02 OH 0.1350 150,000.00 20,250.00
Kepala tukang L.03 OH 0.0135 175,000.00 2,362.50
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 31,817.50
B BAHAN
Pipa PVC 4" m 1.2000 54,800.00 65,760.00
Perlengkapan % 35.0000 65,760.00 23,016.00
JUMLAH HARGA BAHAN 88,776.00
C PERALATAN
JENIS PEKERJAAN : A.5.1.1.33 Pemasangan 1 M1 pipa air limbah jenis pipa tanah diameter 20 Cm
SATUAN : M1
HARGA SATUAN : Rp 592,171.80
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 105,000.00 84,000.00
Tukang L.02 OH 0.0400 150,000.00 6,000.00
Kepala tukang L.03 OH 0.0040 175,000.00 700.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 91,400.00
B BAHAN
Pipa tanah m1 1.6000 249,700.00 399,520.00
Semen Portland kg 35.0000 1,240.00 43,400.00
Pasir Pasang m3 0.0140 176,600.00 2,472.40
Pasir urug m3 0.0140 110,400.00 1,545.60
JUMLAH HARGA BAHAN 446,938.00
C PERALATAN
JENIS PEKERJAAN : A.5.1.1.34 Pemasangan 1 M1 pipa air limbah jenis pipa tanah diameter 15 cm
SATUAN : M1
HARGA SATUAN : Rp 280,415.74
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 105,000.00 6,300.00
Tukang L.02 OH 0.0300 150,000.00 4,500.00
Kepala tukang L.03 OH 0.0030 175,000.00 525.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 11,850.00
B BAHAN
Pipa AW diameter 4" m1 1.6000 149,200.00 238,720.00
Semen Portland kg 0.6800 1,240.00 843.20
Pasir Pasang m3 0.0130 176,600.00 2,295.80
Pasir urug m3 0.0110 110,400.00 1,214.40
JUMLAH HARGA BAHAN 243,073.40
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 105,000.00 14,700.00
Tukang L.02 OH 0.0700 150,000.00 10,500.00
Kepala tukang L.03 OH 0.0070 175,000.00 1,225.00
Mandor L.04 OH 0.0070 175,000.00 1,225.00
JUMLAH TENAGA KERJA 27,650.00
B BAHAN
Pipa AW diameter 6" m1 1.1000 149,200.00 164,120.00
Bata Merah m3 0.0270 - -
Semen Portland kg 3.9200 1,240.00 4,860.80
Pasir Pasang m3 0.0560 176,600.00 9,889.60
Pasir urug m3 0.0240 110,400.00 2,649.60
JUMLAH HARGA BAHAN 181,520.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.3800 105,000.00 39,900.00
Tukang L.02 OH 0.1900 150,000.00 28,500.00
Kepala tukang L.03 OH 0.0190 175,000.00 3,325.00
Mandor L.04 OH 0.0190 175,000.00 3,325.00
JUMLAH TENAGA KERJA 75,050.00
B BAHAN
Pipa AW diameter 8" m1 1.1000 249,700.00 274,670.00
Bata Merah m3 0.5500 - -
Semen Portland kg 10.3000 1,240.00 12,772.00
Pasir Pasang m3 0.0610 176,600.00 10,772.60
Pasir urug m3 0.0690 110,400.00 7,617.60
JUMLAH HARGA BAHAN 305,832.20
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 105,000.00 8,505.00
Tukang L.02 OH 0.0410 150,000.00 6,150.00
Mandor L.04 OH 0.0080 175,000.00 1,400.00
JUMLAH TENAGA KERJA 16,055.00
B BAHAN
Pipa PVC dia 50 mm Unit 1.0000 27,700.00 27,700.00
JUMLAH HARGA BAHAN 27,700.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0060 A #VALUE!
handle crane 2 T
JUMLAH HARGA ALAT #VALUE!
D JUMLAH (A+B+C) #VALUE!
E Overhead & profit 10% x Jumlah #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 96,100.00 7,784.10
Tukang L.02 OH 0.0410 129,500.00 5,309.50
Mandor L.04 OH 0.0080 148,400.00 1,187.20
148400.000 14,280.80
B BAHAN
Pipa PVC dia 63 mm m 1.0000 27,700.00 27,700.00
JUMLAH HARGA BAHAN 27,700.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0060 300,000.00 1,800.00
handle crane 2 T
JUMLAH HARGA ALAT 1,800.00
D JUMLAH (A+B+C) 43,780.80
E Overhead & profit 10% x Jumlah 4,378.08
F Harga Satuan Pekerjaan (D+E) 48,158.88
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0880 105,000.00 9,240.00
Tukang L.02 OH 0.0440 150,000.00 6,600.00
Mandor L.04 OH 0.0088 175,000.00 1,540.00
JUMLAH TENAGA KERJA 17,380.00
B BAHAN
Pipa PVC dia 75 mm Unit 1.0000 39,000.00 39,000.00
JUMLAH HARGA BAHAN 39,000.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0080 A #VALUE!
handle crane 2 T
JUMLAH HARGA ALAT #VALUE!
D JUMLAH (A+B+C) #VALUE!
E Overhead & profit 10% x Jumlah #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0940 105,000.00 9,870.00
Tukang L.02 OH 0.0470 150,000.00 7,050.00
Mandor L.04 OH 0.0090 175,000.00 1,575.00
JUMLAH TENAGA KERJA 18,495.00
B BAHAN
Pipa PVC dia 90 mm m 1.0000 54,100.00 54,100.00
JUMLAH HARGA BAHAN 54,100.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0080 300,000.00 2,400.00
handle crane 2 T
JUMLAH HARGA ALAT 2,400.00
D JUMLAH (A+B+C) 74,995.00
E Overhead & profit 10% x Jumlah 7,499.50
F Harga Satuan Pekerjaan (D+E) 82,494.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1050 105,000.00 11,025.00
Tukang L.02 OH 0.0530 150,000.00 7,950.00
Mandor L.04 OH 0.0110 175,000.00 1,925.00
JUMLAH TENAGA KERJA 20,900.00
B BAHAN
Pipa PVC dia 110 mm m 1.0000 83,800.00 83,800.00
JUMLAH HARGA BAHAN 83,800.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0100 300,000.00 3,000.00
handle crane 2 T
JUMLAH HARGA ALAT 3,000.00
D JUMLAH (A+B+C) 107,700.00
E Overhead & profit 10% x Jumlah 10,770.00
F Harga Satuan Pekerjaan (D+E) 118,470.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1180 105,000.00 12,390.00
Tukang L.02 OH 0.0590 150,000.00 8,850.00
Mandor L.04 OH 0.0120 175,000.00 2,100.00
JUMLAH TENAGA KERJA 23,340.00
B BAHAN
Pipa PVC dia 150 mm m 1.0000 149,200.00 149,200.00
JUMLAH HARGA BAHAN 149,200.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0120 300,000.00 3,600.00
handle crane 2 T
JUMLAH HARGA ALAT 3,600.00
D JUMLAH (A+B+C) 176,140.00
E Overhead & profit 10% x Jumlah 17,614.00
F Harga Satuan Pekerjaan (D+E) 193,754.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.1890 105,000.00 19,845.00
Tukang L.02 OH 0.0950 150,000.00 14,250.00
Mandor L.04 OH 0.0190 175,000.00 3,325.00
JUMLAH TENAGA KERJA 37,420.00
B BAHAN
Pipa PVC dia 200 mm m 1.0000 295,500.00 295,500.00
JUMLAH HARGA BAHAN 295,500.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0240 300,000.00 7,200.00
handle crane 2 T
JUMLAH HARGA ALAT 7,200.00
D JUMLAH (A+B+C) 340,120.00
E Overhead & profit 10% x Jumlah 34,012.00
F Harga Satuan Pekerjaan (D+E) 374,132.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2560 105,000.00 26,880.00
Tukang L.02 OH 0.1280 150,000.00 19,200.00
Mandor L.04 OH 0.0260 175,000.00 4,550.00
JUMLAH TENAGA KERJA 50,630.00
B BAHAN
Pipa PVC dia 250 mm m 1.0000 534,800.00 534,800.00
JUMLAH HARGA BAHAN 534,800.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0340 300,000.00 10,200.00
handle crane 2 T
JUMLAH HARGA ALAT 10,200.00
D JUMLAH (A+B+C) 595,630.00
E Overhead & profit 10% x Jumlah 59,563.00
F Harga Satuan Pekerjaan (D+E) 655,193.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.2940 105,000.00 30,870.00
Tukang L.02 OH 0.1470 150,000.00 22,050.00
Mandor L.04 OH 0.0290 175,000.00 5,075.00
JUMLAH TENAGA KERJA 57,995.00
B BAHAN
Pipa PVC dia 300 mm m 1.0000 918,100.00 918,100.00
JUMLAH HARGA BAHAN 918,100.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0400 300,000.00 12,000.00
handle crane 2 T
JUMLAH HARGA ALAT 12,000.00
D JUMLAH (A+B+C) 988,095.00
E Overhead & profit 10% x Jumlah 98,809.50
F Harga Satuan Pekerjaan (D+E) 1,086,904.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.5440 105,000.00 57,120.00
Tukang L.02 OH 0.2720 150,000.00 40,800.00
Mandor L.04 OH 0.0540 175,000.00 9,450.00
JUMLAH TENAGA KERJA 107,370.00
B BAHAN
Pipa PVC dia 400 mm m 1.0000 1,507,600.00 1,507,600.00
JUMLAH HARGA BAHAN 1,507,600.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0800 300,000.00 24,000.00
handle crane 2 T
JUMLAH HARGA ALAT 24,000.00
D JUMLAH (A+B+C) 1,638,970.00
E Overhead & profit 10% x Jumlah 163,897.00
F Harga Satuan Pekerjaan (D+E) 1,802,867.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.6690 105,000.00 70,245.00
Tukang L.02 OH 0.3350 150,000.00 50,250.00
Mandor L.04 OH 0.0670 175,000.00 11,725.00
JUMLAH TENAGA KERJA 132,220.00
B BAHAN
Pipa PVC dia 450 mm m 1.0000 1,949,400.00 1,949,400.00
JUMLAH HARGA BAHAN 1,949,400.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.1000 300,000.00 30,000.00
handle crane 2 T
JUMLAH HARGA ALAT 30,000.00
D JUMLAH (A+B+C) 2,111,620.00
E Overhead & profit 10% x Jumlah 211,162.00
F Harga Satuan Pekerjaan (D+E) 2,322,782.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.8090 105,000.00 84,945.00
Tukang L.02 OH 0.4050 150,000.00 60,750.00
Mandor L.04 OH 0.0810 175,000.00 14,175.00
JUMLAH TENAGA KERJA 159,870.00
B BAHAN
Pipa PVC dia 500 mm m 1.0000 2,391,200.00 2,391,200.00
JUMLAH HARGA BAHAN 2,391,200.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.1220 300,000.00 36,600.00
handle crane 2 T
JUMLAH HARGA ALAT 36,600.00
D JUMLAH (A+B+C) 2,587,670.00
E Overhead & profit 10% x Jumlah 258,767.00
F Harga Satuan Pekerjaan (D+E) 2,846,437.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.9570 105,000.00 100,485.00
Tukang L.02 OH 0.4790 150,000.00 71,850.00
Mandor L.04 OH 0.0960 175,000.00 16,800.00
JUMLAH TENAGA KERJA 189,135.00
B BAHAN
Pipa PVC dia 600 mm m 1.0000 3,852,300.00 3,852,300.00
JUMLAH HARGA BAHAN 3,852,300.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.1450 300,000.00 43,500.00
handle crane 2 T
JUMLAH HARGA ALAT 43,500.00
D JUMLAH (A+B+C) 4,084,935.00
E Overhead & profit 10% x Jumlah 408,493.50
F Harga Satuan Pekerjaan (D+E) 4,493,428.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6180 105,000.00 169,890.00
Tukang L.02 OH 0.8090 150,000.00 121,350.00
Mandor L.04 OH 0.1620 175,000.00 28,350.00
JUMLAH TENAGA KERJA 319,590.00
B BAHAN
Pipa PVC dia 800 mm m 1.0000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Sewa Tripot/Tackel & Hari 0.2500 300,000.00 75,000.00
handle crane 2 T
JUMLAH HARGA ALAT 75,000.00
D JUMLAH (A+B+C) #VALUE!
E Overhead & profit 10% x Jumlah #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.6910 105,000.00 177,555.00
Tukang L.02 OH 0.8460 150,000.00 126,900.00
Mandor L.04 OH 0.1690 175,000.00 29,575.00
JUMLAH TENAGA KERJA 334,030.00
B BAHAN
Pipa PVC dia 900 mm Unit 1.0000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Sewa Tripot/Tackel & Hari 0.2620 300,000.00 78,600.00
handle crane 2 T
JUMLAH HARGA ALAT 78,600.00
D JUMLAH (A+B+C) #VALUE!
E Overhead & profit 10% x Jumlah #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.8950 105,000.00 198,975.00
Tukang L.02 OH 0.9480 150,000.00 142,200.00
Mandor L.04 OH 0.1900 175,000.00 33,250.00
JUMLAH TENAGA KERJA 374,425.00
B BAHAN
Pipa PVC dia 1000 mm Unit 1.0000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Sewa Tripot/Tackel & Hari 0.2940 300,000.00 88,200.00
handle crane 2 T
JUMLAH HARGA ALAT 88,200.00
D JUMLAH (A+B+C) #VALUE!
E Overhead & profit 10% x Jumlah #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 2.0990 105,000.00 220,395.00
Tukang L.02 OH 1.0500 150,000.00 157,500.00
Mandor L.04 OH 0.2100 175,000.00 36,750.00
JUMLAH TENAGA KERJA 414,645.00
B BAHAN
Pipa PVC dia 1100 mm m 1.0000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Sewa Tripot/Tackel & Hari 0.3270 300,000.00 98,100.00
handle crane 2 T
JUMLAH HARGA ALAT 98,100.00
D JUMLAH (A+B+C) #VALUE!
E Overhead & profit 10% x Jumlah #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 2.3030 105,000.00 241,815.00
Tukang L.02 OH 1.1520 150,000.00 172,800.00
Mandor L.04 OH 0.2300 175,000.00 40,250.00
JUMLAH TENAGA KERJA 454,865.00
B BAHAN
Pipa PVC dia 1200 mm m 1.0000 a #VALUE!
JUMLAH HARGA BAHAN #VALUE!
C PERALATAN
Sewa Tripot/Tackel & Hari 0.3590 300,000.00 107,700.00
handle crane 2 T
JUMLAH HARGA ALAT 107,700.00
D JUMLAH (A+B+C) #VALUE!
E Overhead & profit 10% x Jumlah #VALUE!
F Harga Satuan Pekerjaan (D+E) #VALUE!
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0350 105,000.00 3,675.00
Tukang L.02 OH 0.0170 150,000.00 2,550.00
Mandor L.04 OH 0.0030 175,000.00 525.00
JUMLAH TENAGA KERJA 6,750.00
B BAHAN
Pipa HDPE dia 63 mm m 1.0000 39,200.00 39,200.00
JUMLAH HARGA BAHAN 39,200.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0190 300,000.00 5,700.00
handle crane 2 T
JUMLAH HARGA ALAT 5,700.00
D JUMLAH (A+B+C) 51,650.00
E Overhead & profit 10% x Jumlah 5,165.00
F Harga Satuan Pekerjaan (D+E) 56,815.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 105,000.00 4,200.00
Tukang L.02 OH 0.0200 150,000.00 3,000.00
Mandor L.04 OH 0.0040 175,000.00 700.00
JUMLAH TENAGA KERJA 7,900.00
B BAHAN
Pipa HDPE dia 100 mm m 1.0000 184,500.00 184,500.00
JUMLAH HARGA BAHAN 184,500.00
C PERALATAN
Sewa Tripot/Tackel & Hari 0.0190 300,000.00 5,700.00
handle crane 2 T
JUMLAH HARGA ALAT 5,700.00
D JUMLAH (A+B+C) 198,100.00
E Overhead & profit 10% x Jumlah 19,810.00
F Harga Satuan Pekerjaan (D+E) 217,910.00
A TENAGA
Pekerja L.01 OH 0.0450 105,000.00 4,725.00
Tukang L.02 OH 0.0230 150,000.00 3,450.00
Mandor L.04 OH 0.0050 175,000.00 875.00
RENCANA ANGGARAN BIAYA (RAB)
II Perlengkapan K3
1 Safety helmet Bh 5.00 45,000.00 225,000.00
2 Sarung tangan Bh 5.00 25,000.00 125,000.00
3 Rompi Bh 5.00 75,000.00 375,000.00
4 Rambu Peringatan Bh 1.00 100,000.00 100,000.00
5 sepatu Boot Bh 5.00 65,000.00 325,000.00
6 Prokest Covid Ls 1.00 400,000.00 400,000.00
III Pengikisan/pengerokan dan Pembersihan permukaan cat lama Bagian Dalam M2 112.52 19,387.50 2,181,481.50
1 Pemasangan Titik Lampu ( Downligh LED 18 Watt ) Putih ( Philips ) Ttk 4.00 355,300.00 1,421,200.00
2 Pemasangan Titik Lampu ( Downligh LED 8 Watt ) Kuning ( Philips ) Ttk 8.00 245,300.00 1,962,400.00
3 Pemasangan Titik Lampu ( Downligh LED 8 Watt ) Putih ( Philips ) Ttk 4.00 245,300.00 981,200.00
4 Pasangan Saklar Seri bh 2.00 40,700.00 81,400.00
5 Pasangan Saklar Tunggal bh 4.00 35,200.00 140,800.00
1 Pasangan Pipa 1 x1/2" untuk Saluran Kran berwudhu, urinor dan Bak Toilet M 15.00 51,374.40 770,616.00
2 Pasangan Pipa 3/2" untuk Kran M 3.40 31,992.40 108,774.16
3 Pasangan Kran Stainlesee Bh 17.00 142,092.50 2,415,572.50
I PEKERJAAN PENAMBAHAN TEMPAT WUDHU BARU DISAMPING MASJID 15,204,306.79
V Pekerjaan Pengecatan
1 Pengecatan Dinding Dalam dengan Jotun Interior( 1 lapis Alkali, 2 Lapis Cat Penutup ) m2 8.79 23,034.00 202,468.86
VI Pekerjaan Sanitasi
1 Pasangan Pipa 1 x1/2" untuk Saluran Kran berwudhu dari Tangki air ke lokasi M 46.00 51,374.40 2,363,222.40
2 Pasangan Pipa 3/2" untuk Kran M 0.40 31,992.40 12,796.96
3 Pasangan Kran Stainlesee Bh 4.00 142,092.50 568,370.00
:Dibuat oleh
KONSULTAN PERENCANA
CV. GREEN RISE CONSULTANT
ALDY, ST
Team Leader
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN MEKANIKA / ELEKTRIKAL
ELAN ADRAYAZI, ST
Supervision Engineer AZMAWATI
Pelaksana
Pihak Owner
Nama Dinas : DINAS PERUMAHAN RAKYAT,KAWASAN PERMUKIMAN DAN PERTANAHAN
Kuasa Pengguna Anggaran : Ir.ICHSANUSATARUDDIN
NIP. : 19640622 199003 1 004
Pejabat Pelaksana Teknis Kegiatan (PPTK) : EFNI USLINDA, S.T, M.Eng
NIP. : 19690517 199703 2 005
Data Laporan
Lokasi Di Tanda Tangan : Padang
MINGGU KE : 1 (Satu)
PENYEDIA
Program : PROGRAM PENINGKATAN PRASARANA, SARANA DAN UTILITAS UMUM (PSU) No./Tgl. Kontrak : 046/SPK/PPK1-FISIK.PSU/PERKIMTAN/VI-2022
Kegiatan : URUSAN PENYELENGGARAAN PSU PERMUKIMAN Penyedia : CV. PUTRA BALEPOH
Pekerjaan : PEMBANGUNAN JALAN LINGKUNGAN CADUAK JORONG PITAMEH NAGARI PANGIAN KECAMATAN LINTAU BUO KABUPATEN TANAH DATAR Minggu Ke : 1
Lokasi : KAB. TANAH DATAR Priode : 7-Jul-2022 S/D 13-Jul-2022
T. Anggaran : 2022
JUMLAH PEKERJAAN PENDAHULUAN & PERSIAPAN 100 0.00 10.30 10.30 89.70
Padang, 13/July/2022
Diperiksa dan Disetujui oleh, Dibuat oleh,
KONSULTAN PENGAWAS PENYEDIA
CV. INTEGRITAS ENGINEERING CV. PUTRA BALEPOH
A PEKERJAAN PERSIAPAN
1.1 Mobilisasi
1.2 Sistem Manajemen Keselamatan Konstruksi (SMKK)
### ###
### ###
### ###
### ###
2.4 Beton Mutu Fc=19,3 Mpa (K-225) Manual
1.00 ls
Sistem Manajemen Keselamatan Konstruksi (SMKK) 1.00 ls
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME?
Beton Mutu Fc=19,3 Mpa (K-225) Manual 69.76 m3
- 0
No. Uraian
1 2
1 Mobilisasi
Upah
Pekerja 1
Tukang
Kepala Tukang
Mandor
Bahan
###
###
###
Peralatan
Alat 1
Alat 2
3 Managemen Mutu
Upah
Pekerja 1
Tukang
Kepala Tukang
Mandor
Bahan
###
###
###
###
Peralatan
Alat 1
Alat 2
Total
No Uraian
100%
1 2 3
Upah
Pekerja 1 25.00
Tukang 0.00
Kepala Tukang 2.00
Mandor 4.00
Bahan
1 Sirtu 69.76
2 Paku 5-7 cm 3.60
10 Kayu Klas 3 0.14
11 Beton ready mixed mutu K-225 0.00
24 Polytene 125 Mikrom 0.00
Peralatan
Baby Roller (1,3 -3 ton) 0.99
Alat Bantu 581.29
Pick Up 0.00
1-Mingguan
aian Indeks
Volume Satuan
2 3 4
-
0.300 - OH
0.100 - OH
0.010 - OH
0.015 - OH
70.000 - m3
11.500 - Kg
0.043 - m3
0.000 - Jam
0.000 - Jam
0.700 - OH
0.350 - OH
0.035 - OH
0.035 - OH
17.600 - Doos
10.000 - Kg
0.045 - M3
1.500 - Kg
0.000 - Jam
0.000 - Jam
0.900 - OH
0.450 - OH
0.045 - OH
0.045 - OH
13.250 - Bh
9.300 - Kg
0.018 - m3
1.940 - Kg
0.000 - Jam
0.000 - Jam
581.29
0.008 581.29 OH
0.000 581.29 OH
0.000 581.29 OH
0.002 581.29 OH
0.000 581.29 Bh
0.000 581.29 Kg
0.000 581.29 m3
0.000 581.29 Kg
58.13
0.250 58.13 OH
0.000 58.13 OH
0.000 58.13 OH
0.025 58.13 OH
1.200 58.13 m3
12.00
0.260 12.00 OH
0.000 12.00 OH
0.026 12.00 OH
0.000 12.00 OH
0.011 12.00 Mᶟ
0.300 12.00 Kg
0.013 - OH
0.000 - OH
0.000 - OH
0.000 - OH
0.200 - Kg
0.000 - Jam
0.000 - Jam
0.400 - OH
0.100 - OH
0.010 - OH
0.040 - OH
1.020 - M3
0.149 - Jam
- - OH -
- - OH -
- - OH -
- - OH -
- - m3 -
- - Kg -
- - Kg -
- - Jam
- - Jam
- -
- - OH -
- - OH -
- - OH -
- - OH -
- - Doos -
- - Kg -
- - M3 -
- - Kg -
- - Jam
- - Jam
- - OH -
- - OH -
- - OH -
- - OH -
- - Bh -
- - Kg -
- - m3 -
- - Kg -
- - Jam
- - Jam
5.00 - OH -
- - OH -
- - OH -
2.00 - OH -
- - Bh -
- - Kg -
- - m3 -
- - Kg -
1.00 - jam
582.00 - Ls
15.00 - OH -
- - OH -
- - OH -
2.00 - OH -
70.00 - m3 -
- - Jam
- - Jam
4.00 - OH -
- - OH -
1.00 - OH -
- - OH -
1.00 - Mᶟ -
4.00 - Kg -
- - Jam
- - Jam
- - OH -
- - OH -
- - OH -
- - OH -
- - Kg -
- - Jam
- - Jam
- - OH -
- - OH -
- - OH -
- - OH -
- - M3 -
- - Jam
- OH - - OH
- OH - - OH
- OH - - OH
- OH - - OH
- m3 - - m3
- Kg - - Kg
- Kg - - Kg
- - Jam - - Jam
- - Jam - - Jam
- - - -
- OH - - OH
- OH - - OH
- OH - - OH
- OH - - OH
- Doos - - Doos
- Kg - - Kg
- M3 - - M3
- Kg - - Kg
- - Jam - - Jam
- - Jam - - Jam
- -
- OH - - OH
- OH - - OH
- OH - - OH
- OH - - OH
- Bh - - Bh
- Kg - - Kg
- m3 - - m3
- Kg - - Kg
- - Jam - - Jam
- - Jam - - Jam
- 290.65
- OH - 290.65 OH
- OH - 290.65 OH
- OH - 290.65 OH
- OH - 290.65 OH
- Bh - 290.65 Bh
- Kg - 290.65 Kg
- m3 - 290.65 m3
- Kg - 290.65 Kg
- -
- OH - - OH
- OH - - OH
- OH - - OH
- OH - - OH
- m3 - - m3
- - Jam - - Jam
- - Jam - - Jam
- -
- OH - - OH
- OH - - OH
- OH - - OH
- OH - - OH
- Mᶟ - - Mᶟ
- Kg - - Kg
- - Jam - - Jam
- - Jam - - Jam
- -
- OH - - OH
- OH - - OH
- OH - - OH
- OH - - OH
- Kg - - Kg
- - Jam - - Jam
- - Jam - - Jam
- -
- OH - - OH
- OH - - OH
- OH - - OH
- OH - - OH
- M3 - - M3
- - Jam - - Jam
- - OH -
- - OH -
- - OH -
- - OH -
- - m3 -
- - Kg -
- - Kg -
- - Jam -
- - Jam -
- -
- - OH -
- - OH -
- - OH -
- - OH -
- - Doos -
- - Kg -
- - M3 -
- - Kg -
- - Jam -
- - Jam -
- - OH -
- - OH -
- - OH -
- - OH -
- - Bh -
- - Kg -
- - m3 -
- - Kg -
- - Jam -
- - Jam -
290.65
- 290.65 Bh -
- 290.65 Kg -
- 290.65 m3 -
- 290.65 Kg -
34.88
- 34.88 OH 9.00
- 34.88 OH -
- 34.88 OH -
- 34.88 OH 1.00
- 34.88 m3 41.85
- 34.88 Jam -
- 34.88 Jam -
- - OH -
- - OH -
- - OH -
- - OH -
- - Mᶟ -
- - Kg -
- - Jam -
- - Jam -
- - OH -
- - OH -
- - OH -
- - OH -
- - Kg -
- - Jam -
- - Jam -
- - OH -
- - OH -
- - OH -
- - OH -
- - M3 -
- - Jam -
Jumat Sabtu
10% 10%
Volume Satuan Upah Bahan Peralatan Volume Satuan Upah
4 4
- - - -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- m3 - - m3
- Kg - - Kg
- Kg - - Kg
- Jam - - Jam
- Jam - - Jam
- - - -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- Doos - - Doos
- Kg - - Kg
- M3 - - M3
- Kg - - Kg
- Jam - - Jam
- Jam - - Jam
- -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- Bh - - Bh
- Kg - - Kg
- m3 - - m3
- Kg - - Kg
- Jam - - Jam
- Jam - - Jam
- -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- Bh - - Bh
- Kg - - Kg
- m3 - - m3
- Kg - - Kg
- jam - - jam
- Ls - - Ls
23.25 -
23.25 OH 6.00 - OH -
23.25 OH - - OH -
23.25 OH - - OH -
23.25 OH 1.00 - OH -
23.25 m3 27.90 - m3
3.60 8.40
- -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- Kg - - Kg
- Jam - - Jam
- Jam - - Jam
- -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- OH - - OH -
- M3 - - M3
- Jam - - Jam
Sabtu
10%
Bahan Peralatan
4
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.09
2.52
-
-
-
-
-
-
LAPORAN HARIAN
1 Pekerja 1 0.00 OH
2 Tukang 0.00 OH
3 Kepala Tukang 0.00 OH
4 Mandor 0.00 OH
Peralatan Cuaca
No No
Jenis Peralatan Jumlah Kondisi Waktu Cerah Berawan Hujan
1 Pekerja 1 0.00 OH
2 Tukang 0.00 OH
3 Kepala Tukang 0.00 OH
4 Mandor 0.00 OH
Peralatan Cuaca
No No
Jenis Peralatan Jumlah Kondisi Waktu Cerah Berawan Hujan
1 - a Pagi √ - -
2 - b Siang √ - -
3 - c Sore √ - -
4 - d Malam √ - -
Dst.
INSTRUKSI / SARAN
1 Pekerja 1 3.00 OH
2 Tukang 0.00 OH
3 Kepala Tukang 0.00 OH
4 Mandor 1.00 OH
Peralatan Cuaca
No No
Jenis Peralatan Jumlah Kondisi Waktu Cerah Berawan Hujan
1 Pekerja 1 OH
UR
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
IB
Peralatan Cuaca
[L
No No
Jenis Peralatan Jumlah Kondisi Waktu Cerah Berawan Hujan
1 - a Pagi √ - -
2 - b Siang √ - -
3 - c Sore √ - -
4 - d Malam √ - -
Dst.
INSTRUKSI / SARAN
Peralatan Cuaca
No No
Jenis Peralatan Jumlah Kondisi Waktu Cerah Berawan Hujan
1 a Pagi √ - -
2 b Siang - √ -
3 c Sore - √ -
4 d Malam - √ -
Dst.
INSTRUKSI / SARAN
1 - a Pagi
2 - b Siang
3 - c Sore
4 - d Malam
Dst.
INSTRUKSI / SARAN
MINGGU KE-
BOBOT
NO. URAIAN PEKERJAAN Persentase KETERANGAN
%
M. 1 M. 2 M. 3 M. 4
1 2 3 4 5 6 7 13 14
100%
A Mobilisasi 2.05 2.05
JUMLAH 100