A. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran & bouwplank 188.00 m' 53,068.80 9,976,934.40 0.24 100.00 188.00 9,976,934.40 0.24
2 Sewa direksi keet uk. 18,00 m2 1.00 ls 8,000,000.00 8,000,000.00 0.19 100.00 1.00 8,000,000.00 0.19
4 Papan nama proyek digital printing uk. 1,50 x 2,00 m 3.00 m2 297,416.00 892,248.00 0.02 100.00 3.00 892,248.00 0.02
6 Pengadaan listrik dan air kerja 1.00 ls 5,000,000.00 5,000,000.00 0.12 100.00 1.00 5,000,000.00 0.12
Drop Hammer 1.00 ls 5,000,000.00 5,000,000.00 0.12 100.00 1.00 5,000,000.00 0.12
- Pembuatan kartu identitas pekerja (KIP) 20.00 lbr 10,000.00 200,000.00 0.00 - - - -
- Spanduk (Banner) 3.00 lbr 100,000.00 300,000.00 0.01 100.00 3.00 300,000.00 0.01
PEKERJAAN DALAM KONTRAK PEKERJAAN DALAM LAPANGAN
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA JUMLAH BOBOT JUMLAH BOBOT
PRESTASI VOLUME
SATUAN (Rp) HARGA (Rp.) (%) HARGA (Rp.) (%)
1 2 3 4 5 6 7 8 9 10 11
- Poster 3.00 lbr 100,000.00 300,000.00 0.01 100.00 3.00 300,000.00 0.01
- Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka) 1.00 ls 750,000.00 750,000.00 0.02 - - - -
1 Pek. Galian tanah pondasi 43.04 m3 82,500.00 3,550,800.00 0.09 75.00 32.28 2,663,100.00 0.06
3 Pek. Urugan pasir alas pondasi pile cup t. 5 cm 5.51 m3 244,680.00 1,348,186.80 0.03 10.00 0.55 134,818.68 0.00
4 Pek. Urugan tanah merah peninggian lantai t. 75 cm 1,272.30 m3 156,480.00 199,089,504.00 4.81 - - - -
6 Pek. Aanstamping (batu kosong) 3.84 m3 461,029.80 1,770,354.43 0.04 75.00 2.88 1,327,765.82 0.03
7 Pek. Pondasi batu kali 1 pc : 5 ps (dibawah S1) 30.28 m3 825,102.60 24,984,106.73 0.60 75.00 22.71 18,738,080.05 0.45
8 Pek. Pondasi batu kali 1 pc : 5 ps (area servis) 10.26 m3 825,102.60 8,465,552.68 0.20 - - - -
1 Pek. Lantai kerja pile cup t. 10 cm 11.02 m3 836,714.00 9,220,588.28 0.22 10.00 1.10 922,058.83 0.02
Pekerjaan Tiang Pancang ø 30 cm Bottom P. 6 Meter 624.00 m' 454,000.00 283,296,000.00 6.84 100.00 624.00 283,296,000.00 6.84
Pekerjaan Tiang Pancang ø 30 cm Middle P. 6 Meter 624.00 m' 454,000.00 283,296,000.00 6.84 100.00 624.00 283,296,000.00 6.84
Pekerjaan Tiang Pancang ø 30 cm Middle P. 6 Meter 624.00 m' 454,000.00 283,296,000.00 6.84 100.00 624.00 283,296,000.00 6.84
Pekerjaan Tiang Pancang ø 30 cm Middle P. 3 Meter 312.00 m' 454,000.00 141,648,000.00 3.42 100.00 312.00 141,648,000.00 3.42
Bobok tiang pancang 104.00 ttk 150,000.00 15,600,000.00 0.38 100.00 104.00 15,600,000.00 0.38
Dolly/alat bantu tiang pancang Jack in Pile 104.00 ttk 150,000.00 15,600,000.00 0.38 100.00 104.00 15,600,000.00 0.38
Biaya Pengelasan 208.00 Samb 180,000.00 37,440,000.00 0.90 100.00 208.00 37,440,000.00 0.90
Pek. Cor beton ready mix K-300 44.10 m3 1,207,150.00 53,235,315.00 1.29 - - - -
Pek. Pembesian 7,803.93 kg 14,336.50 111,881,042.45 2.70 10.00 780.39 11,188,104.24 0.27
Pek. Cor beton ready mix K-300 14.40 m3 1,207,150.00 17,382,960.00 0.42 - - - -
Pek. Cor beton ready mix K-300 43.04 m3 1,207,150.00 51,955,736.00 1.25 - - - -
Pek. Pembesian 6,642.44 kg 14,336.50 95,229,341.06 2.30 10.00 664.24 9,522,934.11 0.23
Pek. Cor beton ready mix K-300 11.52 m3 1,207,150.00 13,906,368.00 0.34 - - - -
Pek. Cor beton ready mix K-300 1.60 m3 1,207,150.00 1,931,440.00 0.05 - - - -
Pek. Cor beton ready mix K-300 0.84 m3 1,207,150.00 1,014,006.00 0.02 - - - -
Pek. Cor beton ready mix K-300 169.64 m3 1,207,150.00 204,780,926.00 4.94 - - - -
PEKERJAAN DALAM KONTRAK PEKERJAAN DALAM LAPANGAN
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA JUMLAH BOBOT JUMLAH BOBOT
PRESTASI VOLUME
SATUAN (Rp) HARGA (Rp.) (%) HARGA (Rp.) (%)
1 2 3 4 5 6 7 8 9 10 11
Pek. Cor beton ready mix K-300 10.94 m3 1,207,150.00 13,206,221.00 0.32 - - - -
Pek. Cor beton ready mix K-300 38.45 m3 1,207,150.00 46,414,917.50 1.12 - - - -
Pek. Cor beton ready mix K-300 1.73 m3 1,178,300.00 2,038,459.00 0.05 - - - -
Pek. Cor beton ready mix K-300 6.33 m3 1,207,150.00 7,641,259.50 0.18 - - - -
Pek. Cor beton ready mix K-300 1.84 m3 1,207,150.00 2,221,156.00 0.05 - - - -
Pek. Cor beton ready mix K-300 6.73 m3 1,207,150.00 8,124,119.50 0.20 - - - -
Pek. Cor beton site mix K-225 0.26 m3 1,207,150.00 313,859.00 0.01 - - - -
Pek. Cor beton ready mix K-300 49.20 m3 1,207,150.00 59,391,780.00 1.43 - - - -
PEKERJAAN DALAM KONTRAK PEKERJAAN DALAM LAPANGAN
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA JUMLAH BOBOT JUMLAH BOBOT
PRESTASI VOLUME
SATUAN (Rp) HARGA (Rp.) (%) HARGA (Rp.) (%)
1 2 3 4 5 6 7 8 9 10 11
Pek. Cor beton ready mix K-300 26.35 m3 1,207,150.00 31,808,402.50 0.77 - - - -
Pek. Cor beton ready mix K-300 17.39 m3 1,207,150.00 20,992,338.50 0.51 - - - -
Pek. Cor beton ready mix K-300 0.72 m3 1,207,150.00 869,148.00 0.02 - - - -
Pek. Cor beton ready mix K-300 118.00 m3 1,207,150.00 142,443,700.00 3.44 - - - -
Pek. Cor beton ready mix K-300 11.52 m3 1,207,150.00 13,906,368.00 0.34 - - - -
Pek. Cor beton site mix K-225 0.95 m3 1,068,234.00 1,014,822.30 0.02 - - - -
Pek. Cor beton site mix K-225 7.94 m3 1,068,234.00 8,481,777.96 0.20 - - - -
Pek. Cor beton site mix K-225 5.98 m3 1,068,234.00 6,388,039.32 0.15 - - - -
Terbilang :