DAFTAR KUANTITAS HARGA
JENIS PEKERJAAN
HARGA SEBELUM
NO. VOL SAT HARGA SATUAN PPN 10 % JUMLAH HARGA
PPN
1 2 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN
SUB TOTAL I Rp -
SUB TOTAL II Rp -
SUB TOTAL II Rp -
JUMLAH Rp -
DIBULATKAN Rp -
ANALISA HARGA SATUAN PEKERJAAN
B.07 1 m³ Beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58
B.07.a Manual
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 4 3 5 6
A TENAGA KERJA
1 Pekerja OH 1.6500 -
2 Tukang batu OH 0.2750 -
3 Kepala tukang OH 0.0275 -
4 Mandor OH 0.1650 -
JUMLAH TENAGA KERJA -
B BAHAN
1 PC / Portland cement Kg 371 -
2 PB / Pasir beton Kg 698 -
3 Kr / Krikil Kg 1047 -
4 Air Liter 215 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH PERALATAN
1 2 3 4 5
A. BAHAN DASAR
1 Sirtu m3
2 Tanah Timbunan
3 Pasir Timbunan m3
4 Pasir Pasangan m3
5 Pasir Beton m3
6 Batu Kali m3
7 Batu Gunung m3
8 Batu Bata Merah Standar m3
9 Batu Pecah (cipping) 2 - 3 CM m3
10 Batu Pecah (cipping) 1 - 2 CM m3
11 Paving Block K300 T= 8 cm (Balok) m2
12 Kanstin pracetak (15x30x50) bh
13 Topi Uskup (Paving Segitiga 8 cm) m'
14 Bambu Sedang m3
15 Ready Mix K225
16 Ready Mix K250 m3
17 Air Campuran ltr
18 Minyak Bekesting (Solar Industri) ltr
19 Karung Sedimen lbr
20 Pipa PVC Tali Air Dia 2" bh
21 Pipa PVC Tali Air Dia 3'' bh
1 2 3 4 5
22 Tripleks 3 mm lbr
23 Tripleks 4 mm lbr
24 Multipleks 9 mm lbr
25 Multipleks 12 mm lbr
26 U-Ditch, 60/60/120, T = 7 cm bh
27 U-Ditch, 60/80/120, T = 7 cm bh
28 U-Ditch 80/80/100, T = 7 cm bh
29 U-Ditch 80/100/120, T = 7 cm bh
30 Penutup, 80/60/60, T = 7 cm m'
31 Penutup, 100/60/60, T = 10 cm m'
32 U-Ditch, 60/60/100, T = 10 cm bh
33 U-Ditch, 80/100/100, T = 12 cm bh
34 U-Ditch 100/120/100, T = 15 cm bh
35 U-Ditch 150/150/100, T = 15 cm bh
36 U-Ditch 200/200/100, T = 25 cm bh
37 Penutup, 80/100/100, T = 12 cm m'
37 Penutup, 80/100/100, T = 12 cm m'
39 Box Culvert 60/60/100, T = 15 cm m'
40 Box Culvert 80/80/100, T = 16 cm m'
41 Box Culvert 100/100/100, T = 15 cm m'
42 Box Culvert 120/120/100, T = 20 cm m'
43 Box Culvert 150/150/100, T = 20 cm m'
44 Box Culvert 200/200/100, T = 25 cm m'
45 Gorong2 Beton Tebal 10 cm, Ø 60 cm ½ m'
NO. URAIAN MATERIAL / BAHAN SATUAN HARGA SATUAN KETERANGAN
1 2 3 4 5
B BAHAN BESI
1 Besi Tulangan (Besi Beton) kg
2 Besi Beton ɸ 10 mm, pj 12 m btg
3 Besi Beton ɸ 12 mm, pj 12 m btg
4 Kawat baja (bendrat) kg
5 Paku Biasa 5, - 10 Cm kg
6 Paku Biasa 2,5-4 Cm kg
7 Paku Seng Biasa kg
8 Paku Beton dos
9 Paku Sekrup 3,5" bh
10 Baut Diameter 12 mm x 18 cm bh
11 Baut Diameter 12 mm x 25 cm bh
12 Besi Plat Strep 5 mm m2
13 Palu / Godam bh
14 Gergaji Besi bh
15 Pahat Beton bh
16 Linggis bh
17 Gurinda/ Mesin Potong Besi bh
C BAHAN KAYU
1 Kayu kelas I Jenis Ulin
- Balok m3
- Papan m3
2 Kayu kelas I Jenis Bayam
- Balok (sawmill) m3
- Papan (sawmill) m3
3 Kayu kelas II Jenis Samarinda
- Balok m3
- Papan m3
4 Kayu kelas III
- Balok m3
- Papan m3
5 Kayu Untuk Perancah m3
6 Formite/Penjaga Jarak Bekesting bh
1 2 3 4 5
D 9
1 Portland cement 40 kg kg
2 Portland cement warna 40 kg zak
E BAHAN CAT
1 Cat Meni Kayu/ Besi kg
2 Cat Kayu Ex Avian kg
3 Minyak cat (tenner super) kg
4 Cat Tembok Anti lumut kg
5 Cat Dasar kg
6 Plamur kg
7 Politur kg
8 Dempul Kayu Cap Kucing / Merah kg
9 Bahan Anti Rayap kg
10 Lem Kayu kg
11 Kertas Gosok ( Amplas) lbr
12 Kuas 4" (Eterna) bh
B. DAFTAR HARGA UPAH KERJA
1 2 3 4 5
1 Pekerja org/hr
2 Tukang Batu org/hr
3 Tukang Kayu org/hr
4 Tukang Besi/Aluminium org/hr
5 Tukang Cat org/hr
6 Tukang Listrik org/hr
7 Tukang Las org/hr
8 Kepala Tukang org/hr
9 Mandor org/hr
1 2 3 4 5
1 DUMP TRUCK 3-4 M3 unit / jam
2 DUMP TRUCK unit / jam
3 BIAYA ANGKUTAN KE PULAU m3
4 POMPA BETON unit / hari
5 MESIN MOLEN BETON unit / hari
1 2 3 4 5
PERTAMINA REGION VII
1 SOLARBIO liter
2 SOLARDEX liter
3 PREMIUN NON SUBSIDI liter
4 PERTALITE liter
5 PERTAMAX liter
6 PELUMAS liter