I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 64,140,000.00 64,140,000.00 4.00 - - - - - 1.00 64,140,000.00 3.73
SUB TOTAL 64,140,000.00 4.00 - - 64,140,000.00 3.73
III DIVISI 3. PEKERJAAN TANAH
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 207.90 174,166.87 36,209,292.27 2.26 - - - - 207.90 36,209,292.27 2.11
3.3 (1) Penyiapan Badan Jalan M2 4,200.00 3,457.68 14,522,256.00 0.91 - - - 4,200.00 14,522,256.00 0.85
SUB TOTAL 50,731,548.27 3.16 - - 50,731,548.27 2.95
V DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 472.50 590,152.55 278,847,079.88 17.38 - - - - - 472.50 278,847,079.88 16.23 700
5.1.(2) Lapis Pondasi Agregat Kelas B M3 630.00 531,486.76 334,836,658.80 20.87 - - - - - 630.00 334,836,658.80 19.49 700
SUB TOTAL 613,683,738.68 38.25 - - 613,683,738.68 35.72
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 2,520.00 13,840.40 34,877,808.00 2.17 - - - - - 2,520.00 34,877,808.00 2.03
6.3(6a) Laston Lapis Antara (AC-BC) Ton 406.66 1,436,848.95 584,311,652.18 36.42 - - - - - 406.66 584,311,652.18 34.01 1506.155
6.3(8) Bahan Anti Pengelupasan Kg 44.73 82,000.00 3,668,089.89 0.23 - - - - - - 44.73 3,668,089.89 0.21 8.13
SUB TOTAL 622,857,550.06 38.83 - - 622,857,550.06 36.26
VII DIVISI 7. STRUKTUR
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 157.32 1,607,112.87 252,826,543.32 15.76 70.71 113,636,564.15 7.08 - - 228.03 366,463,107.47 21.33 293,113,129.72
SUB TOTAL 252,826,543.32 15.76 113,636,564.15 - 366,463,107.47 21.33
A N W A R, ST DASRIL, ST RAHMAT, ST
NIP. 19730307 200701 1 004 Site Engineer Wakil Direktur I
1 REKAP SEPTEMBER
PASWORD =* ***************** *******
. 24,141,390.00 *******
. ***************** ******* ******* ******* *******
Dua Puluh Empat Juta Seratus Empat Puluh Satu Ribu Tiga Ratus Sembilan Puluh Ru
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000024141390 ***
******* ***************** ******* ******* ******* *******
******* 390 1 ***
******* 3 Sembilan Puluh ***
******* Tiga Ratus SEPULUH ***
******* 9 ***
******* 0 Sembilan Puluh ***
******* Sembilan Puluh Sembilan Puluh ***
******* Tiga Ratus Sembilan Puluh ***
******* ***
******* ***
******* 141 2 ***
******* 1 Empat Puluh ***
******* Seratus SEBELAS ***
******* 4 Satu ***
******* 1 Empat Puluh Satu ***
******* Empat Puluh Satu Empat Puluh Satu ***
******* Seratus Empat Puluh Satu Ribu ***
******* ***
******* ***
******* 024 3 ***
******* 0 Dua Puluh ***
******* Empat Belas ***
******* 2 Empat ***
******* 4 Dua Puluh Empat ***
******* Dua Puluh Empat Dua Puluh Empat ***
******* Dua Puluh Empat Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 83 00
== ******* Dua Puluh Empat Juta Dua Puluh Empat Juta Seratus Empat Puluh Satu Ribu Tiga R
== ******* Dua Puluh Empat Juta Seratus Empat Puluh Satu Ribu Tiga Ratus Sembilan Puluh Ru
== ******* Dua Puluh Empat Juta Seratus Empat Puluh Satu Ribu Tiga Ratus Sembilan Puluh Ru
******* ***************** ******* ******* ******* *******
2 REKAP OKTOBER
PASWORD =* ***************** *******
. 429,686,900.00 *******
. ***************** ******* ******* ******* *******
Empat RATUS Dua Puluh Sembilan Juta Enam Ratus Delapan Puluh Enam Ribu Semb
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000429686900 ***
******* ***************** ******* ******* ******* *******
******* 900 1 ***
******* 9 ***
******* Sembilan Ratus Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* Sembilan Ratus ***
******* ***
******* ***
******* 686 2 ***
******* 6 Delapan Puluh ***
******* Enam Ratus Enam Belas ***
******* 8 Enam ***
******* 6 Delapan Puluh Enam ***
******* Delapan Puluh Enam Delapan Puluh Enam ***
******* Enam Ratus Delapan Puluh Enam Ribu ***
******* ***
******* ***
******* 429 3 ***
******* 4 Dua Puluh ***
******* Empat RATUS Sembilan Belas ***
******* 2 Sembilan ***
******* 9 Dua Puluh Sembilan ***
******* Dua Puluh Sembilan Dua Puluh Sembilan ***
******* Empat RATUS Dua Puluh Sembilan Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 92 00
== ******* Empat RATUS Dua Puluh
Empat RATUS Dua Puluh Sembilan Juta Enam Ratus Delapan
== ******* Empat RATUS Dua Puluh Sembilan Juta Enam Ratus Delapan Puluh Enam Ribu Semb
== ******* Empat RATUS Dua Puluh Sembilan Juta Enam Ratus Delapan Puluh Enam Ribu Semb
******* ***************** ******* ******* ******* *******
3 REKAP NOVEMBER
PASWORD =* ***************** *******
. 313,417,100.00 *******
. ***************** ******* ******* ******* *******
Tiga RATUS Tiga Belas Juta Empat Ratus Tujuh Belas Ribu Seratus Rupiah
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000313417100 ***
******* ***************** ******* ******* ******* *******
******* 100 1 ***
******* 1 ***
******* Seratus Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* Seratus ***
******* ***
******* ***
******* 417 2 ***
******* 4 ***
******* Empat Ratus Tujuh Belas ***
******* 1 Tujuh ***
******* 7 Tujuh ***
******* Tujuh Belas Tujuh Belas ***
******* Empat Ratus Tujuh Belas Ribu ***
******* ***
******* ***
******* 313 3 ***
******* 3 ***
******* Tiga RATUS Tiga Belas ***
******* 1 Tiga ***
******* 3 Tiga ***
******* Tiga Belas Tiga Belas ***
******* Tiga RATUS Tiga Belas Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 70 00
== ******* Tiga RATUS Tiga Belas Tiga RATUS Tiga Belas Juta Empat Ratus Tujuh Belas Ribu Se
== ******* Tiga RATUS Tiga Belas Juta Empat Ratus Tujuh Belas Ribu Seratus Rupiah
== ******* Tiga RATUS Tiga Belas Juta Empat Ratus Tujuh Belas Ribu Seratus Rupiah
******* ***************** ******* ******* ******* *******
1
2
3
4
5
6
4 REKAP DESEMBER
PASWORD =* ***************** *******
. 1,153,734,100.00 *******
. ***************** ******* ******* ******* *******
Satu Milyar (Seratus Lima Puluh Tiga Juta Tujuh Ratus Tiga Puluh Empat Ribu Seratu
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 001153734100 ***
******* ***************** ******* ******* ******* *******
******* 100 1 ***
******* 1 ***
******* Seratus Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* Seratus ***
******* ***
******* ***
******* 734 2 ***
******* 7 Tiga Puluh ***
******* Tujuh Ratus Empat Belas ***
******* 3 Empat ***
******* 4 Tiga Puluh Empat ***
******* Tiga Puluh Empat Tiga Puluh Empat ***
******* Tujuh Ratus Tiga Puluh Empat Ribu ***
******* ***
******* ***
******* 153 3 ***
******* 1 Lima Puluh ***
******* (Seratus Tiga Belas ***
******* 5 Tiga ***
******* 3 Lima Puluh Tiga ***
******* Lima Puluh Tiga Lima Puluh Tiga ***
******* (Seratus Lima Puluh Tiga Juta ***
******* ***
******* ***
******* 001 4 ***
******* 0 ***
******* SEBELAS ***
******* 0 Satu ***
******* 1 Satu ***
******* Satu Satu ***
******* Satu Milyar ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah) 91 00
== ******* Satu Milyar (Seratus L Satu Milyar (Seratus Lima Puluh Tiga Juta Tujuh Ratus Tiga P
== ******* Satu Milyar (Seratus Lima Puluh Tiga Juta Tujuh Ratus Tiga Puluh Empat Ribu Seratu
== ******* Satu Milyar (Seratus Lima Puluh Tiga Juta Tujuh Ratus Tiga Puluh Empat Ribu Seratu
******* ***************** ******* ******* ******* *******
1
2
3
4
5
6
5 OKTOBER
PASWORD =* ***************** *******
. 154,099,000.00 *******
. ***************** ******* ******* ******* *******
Seratus Lima Puluh Empat Juta Sembilan Puluh Sembilan Ribu Rupiah
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000154099000 ***
******* ***************** ******* ******* ******* *******
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* ***
******* 099 2 ***
******* 0 Sembilan Puluh ***
******* Sembilan Belas ***
******* 9 Sembilan ***
******* 9 Sembilan Puluh Sembilan ***
******* Sembilan Puluh Sembil Sembilan Puluh Sembilan ***
******* Sembilan Puluh Sembilan Ribu ***
******* ***
******* ***
******* 154 3 ***
******* 1 Lima Puluh ***
******* Seratus Empat Belas ***
******* 5 Empat ***
******* 4 Lima Puluh Empat ***
******* Lima Puluh Empat Lima Puluh Empat ***
******* Seratus Lima Puluh Empat Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 65 00
== ******* Seratus Lima Puluh EmSeratus Lima Puluh Empat Juta Sembilan Puluh Sembilan Ribu
== ******* Seratus Lima Puluh Empat Juta Sembilan Puluh Sembilan Ribu Rupiah
== ******* Seratus Lima Puluh Empat Juta Sembilan Puluh Sembilan Ribu Rupiah
******* ***************** ******* ******* ******* *******
1
2
3
4
5
6
6 NOVEMBER
PASWORD =* ***************** *******
. 151,947,180.00 *******
. ***************** ******* ******* ******* *******
Seratus Lima Puluh Satu Juta Sembilan Ratus Empat Puluh Tujuh Ribu Seratus Delap
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000151947180 ***
******* ***************** ******* ******* ******* *******
******* 180 1 ***
******* 1 Delapan Puluh ***
******* Seratus Sepuluh ***
******* 8 ***
******* 0 Delapan Puluh ***
******* Delapan Puluh Delapan Puluh ***
******* Seratus Delapan Puluh ***
******* ***
******* ***
******* 947 2 ***
******* 9 Empat Puluh ***
******* Sembilan Ratus Tujuh Belas ***
******* 4 Tujuh ***
******* 7 Empat Puluh Tujuh ***
******* Empat Puluh Tujuh Empat Puluh Tujuh ***
******* Sembilan Ratus Empat Puluh Tujuh Ribu ***
******* ***
******* ***
******* 151 3 ***
******* 1 Lima Puluh ***
******* Seratus Sebelas ***
******* 5 Satu ***
******* 1 Lima Puluh Satu ***
******* Lima Puluh Satu Lima Puluh Satu ***
******* Seratus Lima Puluh Satu Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 95 00
== ******* Seratus Lima Puluh SatSeratus Lima Puluh Satu Juta Sembilan Ratus Empat Puluh Tu
== ******* Seratus Lima Puluh Satu Juta Sembilan Ratus Empat Puluh Tujuh Ribu Seratus Delap
== ******* Seratus Lima Puluh Satu Juta Sembilan Ratus Empat Puluh Tujuh Ribu Seratus Delap
******* ***************** ******* ******* ******* *******
1
2
3
4
5
6
7 DESEMBER
PASWORD =* ***************** *******
. 112,413,730.00 *******
. ***************** ******* ******* ******* *******
Seratus Dua Belas Juta Empat Ratus Tiga Belas Ribu Tujuh Ratus Tiga Puluh Rupiah
******* ***************** ******* ******* ******* *******
******* Satu Dua Tiga Empat Lima Enam Tuj ***
******* Ribu Juta Milyar ***
******* 000112413730 ***
******* ***************** ******* ******* ******* *******
******* 730 1 ***
******* 7 Tiga Puluh ***
******* Tujuh Ratus Sepuluh ***
******* 3 ***
******* 0 Tiga Puluh ***
******* Tiga Puluh Tiga Puluh ***
******* Tujuh Ratus Tiga Puluh ***
******* ***
******* ***
******* 413 2 ***
******* 4 ***
******* Empat Ratus Tiga Belas ***
******* 1 Tiga ***
******* 3 Tiga ***
******* Tiga Belas Tiga Belas ***
******* Empat Ratus Tiga Belas Ribu ***
******* ***
******* ***
******* 112 3 ***
******* 1 ***
******* Seratus Dua Belas ***
******* 1 Dua ***
******* 2 Dua ***
******* Dua Belas Dua Belas ***
******* Seratus Dua Belas Juta ***
******* ***
******* ***
******* 000 4 ***
******* 0 ***
******* Sepuluh ***
******* 0 ***
******* 0 ***
******* ***
******* ***
******* ***
******* 000 1 ***
******* 0 ***
******* Sepuluh ***
******* 0 ****
******* 0 ***
******* ***
******* ***
******* ***
******* ***************** ******* ******* ******* *******
******* Rupiah 80 00
== ******* Seratus Dua Belas JutaSeratus Dua Belas Juta Empat Ratus Tiga Belas Ribu Tujuh R
== ******* Seratus Dua Belas Juta Empat Ratus Tiga Belas Ribu Tujuh Ratus Tiga Puluh Rupiah
== ******* Seratus Dua Belas Juta Empat Ratus Tiga Belas Ribu Tujuh Ratus Tiga Puluh Rupiah
******* ***************** ******* ******* ******* *******
1
2
3
4
5
6
Ratus Sembilan Puluh Rupiah
Puluh Satu Ribu Tiga Ratus Sembilan Puluh
Ratus Sembilan Puluh Rupiah
Ratus Sembilan Puluh Rupiah
PERIODE :
PERIODE : 31 AGUSTUS 2018 11 JULI MC LALU
PAKET PEKERJAAN :
PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT
(OTSUS KAB/KOTA)
KONSULTAN
CV. BADRANUZA
Jalan Cut Nyak Dhien Gp. Emperom Kec. Jaya Baru Kota Banda Aceh
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
PAKET PEKERJAAN :
PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
0
KONSULTAN
CV. BADRANUZA
Jalan Cut Nyak Dhien Gp. Emperom Kec. Jaya Baru Kota Banda Aceh
DAFTAR KUANTITAS DAN HARGA PEKERJAAN
MUTUAL CHECK (MC - 0)
I DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 64,140,000.00 64,140,000.00 3.90 - - - - - - 1.00 64,140,000.00 3.90
SUB TOTAL 64,140,000.00 3.90 - - - - 64,140,000.00 3.90
II DIVISI 3. PEKERJAAN TANAH
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 1,260.00 174,166.87 219,450,256.20 13.34 - - - 1,052.10 183,240,963.93 11.14 207.90 36,209,292.27 2.20
3.3 (1) Penyiapan Badan Jalan M2 4,200.00 3,457.68 14,522,256.00 0.88 - - - - - - 4,200.00 14,522,256.00 0.88
SUB TOTAL 233,972,512.20 14.23 - - 183,240,963.93 11.14 50,731,548.27 3.08
III DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 472.50 590,152.55 278,847,079.88 16.96 - - - - - - 472.50 278,847,079.88 16.96
5.1.(2) Lapis Pondasi Agregat Kelas B M3 630.00 531,486.76 334,836,658.80 20.36 - - - - - - 630.00 334,836,658.80 20.36
SUB TOTAL 613,683,738.68 37.32 - - - - 613,683,738.68 37.32
IV DIVISI 6. PERKERASAN ASPAL
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 1,890.00 13,840.40 26,158,356.00 1.59 630.00 8,719,452.00 0.53 - - - 2,520.00 34,877,808.00 2.12
6.3(6a) Laston Lapis Antara (AC-BC) Ton 434.70 1,436,848.95 624,598,238.57 37.98 - - - - - - 434.70 624,598,238.57 37.98
6.3(8) Bahan Anti Pengelupasan Kg 44.42 82,000.00 3,642,440.00 0.22 0.31 25,649.89 0.00 - - - 44.73 3,668,089.89 0.22
SUB TOTAL 654,399,034.57 39.79 8,745,101.89 0.53 - - 663,144,136.45 40.32
V DIVISI 7. STRUKTUR
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 48.74 1,607,112.87 78,330,681.28 4.76 108.58 174,495,862.04 10.61 - - - 157.32 252,826,543.32 15.37
SUB TOTAL 78,330,681.28 4.76 174,495,862.04 10.61 - - 252,826,543.32 15.37
JUMLAH TOTAL 1,644,525,966.73 100.00 183,240,963.93 11.14 183,240,963.93 11.14 1,644,525,966.72 100.00
PPN 10 % 164,452,596.67 164,452,596.67
JUMLAH + PPN 1,808,978,563.40 1,808,978,563.39
DIBULATKAN 1,808,978,000.00 1,808,978,000.00
A N W A R, ST DASRIL, ST RAHMAT, ST
NIP. 19730307 200701 1 004 Site Engineer Wakil Direktur I
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
PAKET PEKERJAAN :
PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
DIVISI - I
UMUM
PENYEDIA :
CV. BADRANUZA
Jalan Cut Nyak Dhien Gp. Emperom Kec. Jaya Baru Kota Banda Aceh
DIVISI - II
DRAINASE
PENYEDIA :
CV. BADRANUZA
Jalan Cut Nyak Dhien Gp. Emperom Kec. Jaya Baru Kota Banda Aceh
DIVISI - III
PEKERJAAN TANAH
PENYEDIA :
CV. BADRANUZA
Jalan Cut Nyak Dhien Gp. Emperom Kec. Jaya Baru Kota Banda Aceh
DIVISI - IV
PELEBARAN PERKERASAN DAN BAHU JALAN
PENYEDIA :
CV. BADRANUZA
Jalan Cut Nyak Dhien Gp. Emperom Kec. Jaya Baru Kota Banda Aceh
DIVISI - V
PERKERASAN BERBUTIR
PENYEDIA :
CV. BADRANUZA
Jalan Cut Nyak Dhien Gp. Emperom Kec. Jaya Baru Kota Banda Aceh
DIVISI - VI
PERKERASAN ASPAL
PENYEDIA :
CV. BADRANUZA
Jalan Cut Nyak Dhien Gp. Emperom Kec. Jaya Baru Kota Banda Aceh
DIVISI - VII
STRUKTUR
PENYEDIA :
CV. BADRANUZA
Jalan Cut Nyak Dhien Gp. Emperom Kec. Jaya Baru Kota Banda Aceh
DIVISI - VIII
PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
PENYEDIA :
CV. BADRANUZA
Jalan Cut Nyak Dhien Gp. Emperom Kec. Jaya Baru Kota Banda Aceh
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
III DIVISI 5. PERKERASAN BERBUTIR 613,683,738.68 613,683,738.68 328,759,145.72 284,924,592.96 613,683,738.68 37.32
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
PENYEDIA : CV. BADRANUZA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
SERTIFIKAT : 1
BULAN : SEPTEMBER
PERIODE : 31 AGUSTUS s/d 30 SEPTEM
HALAMAN : 1 DARI 5
DIVISI 1. UMUM
KEMAJUAN FISIK PEKERJAAN
KUANTITAS PEKERJAAN
NOMOR HARGA JUMLAH HARGA S/D BLN LALU BULAN INI S/D BLN INI
MATA URAIAN ITEM PEKERJAAN SATUAN SATUAN PELAKSANAAN
PEMBAYARAN KONTRAK KONTRAK (Rp) (Rp) JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS KUANTITAS
AWAL (ADD - I) (Rp) (Rp)
1 2 3 4 5 6 7=4x6 8 9=8x6 10 11 = 10 x 6 12 = 8 + 10
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD-I : 15 OKTOBER 2018
NO. KONTRAK ADD-I : 66.1 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 1.808.978.000,-
SUMBER DANA : APBA - OTSUS KAB/KOTA (DOKA) SERTIFIKAT : 1
PENYEDIA : CV. BADRANUZA BULAN : SEPTEMBER
KONSULTAN : PT. GARIS PUTIH SEJAJAR TANGGAL : 31 AGUSTUS s/d 30 SEPTEM
TAHUN ANGGARAN : 2018 HALAMAN : 2 DARI 5
3.3 (1) Penyiapan Badan Jalan M2 4,200.00 - 3,457.68 14,522,256.00 - - 4,200.00 14,522,256.00 4,200.00
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD-I : 15 OKTOBER 2018
NO. KONTRAK ADD-I : 66.1 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD II : 12 DESEMBER 2018
NOMOR KONTRAK ADD II : 66.2 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK ADD II : Rp 1,933,978,000
SUMBER DANA : APBA - OTSUS KAB/KOTA (DOKA) SERTIFIKAT : 1
PENYEDIA : CV. BADRANUZA BULAN : SEPTEMBER
KONSULTAN : PT. GARIS PUTIH SEJAJAR TANGGAL : 31 AGUSTUS s/d 30 SEPTEM
TAHUN ANGGARAN : 2018 HALAMAN : 3 DARI 5
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD-I : 15 OKTOBER 2018
NO. KONTRAK ADD-I : 66.1 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD II : 12 DESEMBER 2018
NOMOR KONTRAK ADD II : 66.2 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK ADD II : 1933978000
SUMBER DANA : APBA - OTSUS KAB/KOTA (DOKA) SERTIFIKAT : 1
PENYEDIA : CV. BADRANUZA BULAN : SEPTEMBER
KONSULTAN : PT. GARIS PUTIH SEJAJAR TANGGAL : 31 AGUSTUS s/d 30 SEPT
TAHUN ANGGARAN : 2018 HALAMAN : 4 DARI 5
6.1 (1)(a)Lapis Resap Pengikat - Aspal Cair Liter 1,890.00 - 13,840.40 26,158,356.00 - - - - -
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD-I : 15 OKTOBER 2018
NO. KONTRAK ADD-I : 66.1 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD II : 12 DESEMBER 2018
NOMOR KONTRAK ADD II : 66.2 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK ADD II : 1933978000
SUMBER DANA : APBA - OTSUS KAB/KOTA (DOKA) SERTIFIKAT : 1
PENYEDIA : CV. BADRANUZA BULAN : SEPTEMBER
KONSULTAN : PT. GARIS PUTIH SEJAJAR TANGGAL : 31 AGUSTUS s/d 30 SEPTEM
TAHUN ANGGARAN : 2018 HALAMAN : 5 DARI 5
DIVISI 7. STRUKTUR
y
KEMAJUAN FISIK PEKERJAAN
KUANTITAS PEKERJAAN
NOMOR HARGA JUMLAH HARGA S/D BLN LALU BULAN INI S/D BLN INI
MATA URAIAN ITEM PEKERJAAN SATUAN SATUAN PELAKSANAAN
PEMBAYARAN KONTRAK KONTRAK (Rp) (Rp) JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS KUANTITAS
AWAL (ADD - I) (Rp) (Rp)
1 2 3 4 5 6 7=4x6 8 9=8x6 10 11 = 10 x 6 12 = 8 + 10
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
AN UMUM DAN PENATAAN RUANG
AYANAN JALAN DAN JEMBATAN
an Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
1
SEPTEMBER
31 AGUSTUS s/d 30 SEPTEMBER 2018
19,242,000.00
19,242,000.00
30.00
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
PEMERINTAH ACEH
AN UMUM DAN PENATAAN RUANG
AYANAN JALAN DAN JEMBATAN
an Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
1
SEPTEMBER
31 AGUSTUS s/d 30 SEPTEMBER 2018
14,522,256.00
14,522,256.00
6.21
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
PEMERINTAH ACEH
AN UMUM DAN PENATAAN RUANG
AYANAN JALAN DAN JEMBATAN
an Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
1
SEPTEMBER
31 AGUSTUS s/d 30 SEPTEMBER 2018
-
-
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
PEMERINTAH ACEH
AN UMUM DAN PENATAAN RUANG
AYANAN JALAN DAN JEMBATAN
an Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
1
SEPTEMBER
31 AGUSTUS s/d 30 SEPTEMBER 2018
-
-
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
PEMERINTAH ACEH
AN UMUM DAN PENATAAN RUANG
AYANAN JALAN DAN JEMBATAN
an Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
1
SEPTEMBER
31 AGUSTUS s/d 30 SEPTEMBER 2018
-
-
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
PENYEDIA : CV. BADRANUZA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
SERTIFIKAT : 2
BULAN : OKTOBER
TANGGAL : 31 OKTOBER 2018
HALAMAN : 1 DARI 5
DIVISI 1. UMUM
KEMAJUAN FISIK PEKERJAAN
KUANTITAS PEKERJAAN
NOMOR HARGA JUMLAH HARGA S/D BLN LALU BULAN INI S/D BLN INI
MATA URAIAN ITEM PEKERJAAN SATUAN SATUAN PELAKSANAAN
PEMBAYARAN KONTRAK KONTRAK (Rp) (Rp) JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS KUANTITAS
AWAL (ADD - I) (Rp) (Rp)
1 2 3 4 5 6 7=4x6 8 9=8x6 10 11 = 10 x 6 12 = 8 + 10
1.2 Mobilisasi Ls 1.00 1.00 64,140,000.00 64,140,000.00 0.30 19,242,000.00 0.40 25,656,000.00 0.70
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
PENYEDIA : CV. BADRANUZA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
SERTIFIKAT : 2
BULAN : OKTOBER
TANGGAL : 31 OKTOBER 2018
HALAMAN : 2 DARI 5
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 1,260.00 207.90 174,166.87 219,450,256.20 - - 207.90 36,209,292.27 207.90
3.3 (1) Penyiapan Badan Jalan M2 4,200.00 4,200.00 3,457.68 14,522,256.00 4,200.00 14,522,256.00 - - 4,200.00
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD-I : 15 OKTOBER 2018
NO. KONTRAK ADD-I : 66.1 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 1.808.978.000,- SERTIFIKAT : 2
PENYEDIA : CV. BADRANUZA BULAN : OKTOBER
KONSULTAN : PT. GARIS PUTIH SEJAJAR TANGGAL : 31 OKTOBER 2018
TAHUN ANGGARAN : 2018 HALAMAN : 3 DARI 5
5.1.(1) Lapis Pondasi Agregat Kelas A M3 472.50 472.50 590,152.55 278,847,079.88 - - 253.13 149,382,364.22 253.13
5.1.(2) Lapis Pondasi Agregat Kelas B M3 630.00 630.00 531,486.76 334,836,658.80 - - 337.50 179,376,781.50 337.50
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD-I : 15 OKTOBER 2018
NO. KONTRAK ADD-I : 66.1 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 1.808.978.000,- SERTIFIKAT : 2
PENYEDIA : CV. BADRANUZA BULAN : OKTOBER
KONSULTAN : PT. GARIS PUTIH SEJAJAR TANGGAL : 31 OKTOBER 2018
TAHUN ANGGARAN : 2018 HALAMAN : 4 DARI 5
6.1 (1)(a)Lapis Resap Pengikat - Aspal Cair Liter 1,890.00 2,520.00 13,840.40 26,158,356.00 - - - - -
6.3(6a) Laston Lapis Antara (AC-BC) Ton 434.70 434.70 1,436,848.95 624,598,238.57 - - - - -
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD-I : 15 OKTOBER 2018
NO. KONTRAK ADD-I : 66.1 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 1.808.978.000,- SERTIFIKAT : 2
PENYEDIA : CV. BADRANUZA BULAN : OKTOBER
KONSULTAN : PT. GARIS PUTIH SEJAJAR TANGGAL : 31 OKTOBER 2018
TAHUN ANGGARAN : 2018 HALAMAN : 5 DARI 5
DIVISI 7. STRUKTUR
y
KEMAJUAN FISIK PEKERJAAN
KUANTITAS PEKERJAAN
NOMOR HARGA JUMLAH HARGA S/D BLN LALU BULAN INI S/D BLN INI
MATA URAIAN ITEM PEKERJAAN SATUAN SATUAN PELAKSANAAN
PEMBAYARAN KONTRAK KONTRAK (Rp) (Rp) JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS KUANTITAS
AWAL (ADD - I) (Rp) (Rp)
1 2 3 4 5 6 7=4x6 8 9=8x6 10 11 = 10 x 6 12 = 8 + 10
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 48.74 157.32 1,607,112.87 78,330,681.28 - - - - -
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
Merdeka No. 24 Meulaboh 23611
RTIFIKAT BULANAN
OKTOBER
31 OKTOBER 2018
JUMLAH HARGA
(Rp)
13 = 12 x 6
44,898,000.00
44,898,000.00
70.00
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
Merdeka No. 24 Meulaboh 23611
RTIFIKAT BULANAN
2
OKTOBER
31 OKTOBER 2018
36,209,292.27
14,522,256.00
50,731,548.27
21.68
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
Merdeka No. 24 Meulaboh 23611
RTIFIKAT BULANAN
2
OKTOBER
31 OKTOBER 2018
149,382,364.22
179,376,781.50
328,759,145.72
53.57
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
Merdeka No. 24 Meulaboh 23611
RTIFIKAT BULANAN
2
OKTOBER
31 OKTOBER 2018
-
-
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
Merdeka No. 24 Meulaboh 23611
RTIFIKAT BULANAN
2
OKTOBER
31 OKTOBER 2018
-
-
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD-I : 15 OKTOBER 2018
NO. KONTRAK ADD-I : 66.1 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 1.808.978.000,- SERTIFIKAT : 3
PENYEDIA : CV. BADRANUZA BULAN : NOVEMBER
KONSULTAN : PT. GARIS PUTIH SEJAJAR TANGGAL : 30 NOVEMBER 2018
TAHUN ANGGARAN : 2018 HALAMAN : 1 DARI 5
DIVISI 1. UMUM
KEMAJUAN FISIK PEKERJAAN
KUANTITAS PEKERJAAN
NOMOR HARGA JUMLAH HARGA S/D BLN LALU BULAN INI S/D BLN INI
MATA URAIAN ITEM PEKERJAAN SATUAN SATUAN PELAKSANAAN
PEMBAYARAN KONTRAK KONTRAK (Rp) (Rp) JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS KUANTITAS
AWAL (ADD - I) (Rp) (Rp)
1 2 3 4 5 6 7=4x6 8 9=8x6 10 11 = 10 x 6 12 = 8 + 10
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
PENYEDIA : CV. BADRANUZA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
SERTIFIKAT : 3
BULAN : NOVEMBER
TANGGAL : 30 NOVEMBER 2018
HALAMAN : 2 DARI 5
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 1,260.00 207.90 174,166.87 219,450,256.20 207.90 36,209,292.27 - - 207.90
3.3 (1) Penyiapan Badan Jalan M2 4,200.00 4,200.00 3,457.68 14,522,256.00 4,200.00 14,522,256.00 - - 4,200.00
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
PENYEDIA : CV. BADRANUZA
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
SERTIFIKAT : 3
BULAN : NOVEMBER
TANGGAL : 30 NOVEMBER 2018
HALAMAN : 3 DARI 5
5.1.(1) Lapis Pondasi Agregat Kelas A M3 472.50 472.50 590,152.55 278,847,079.88 253.13 149,382,364.22 219.38 129,464,715.66 472.50
5.1.(2) Lapis Pondasi Agregat Kelas B M3 630.00 630.00 531,486.76 334,836,658.80 337.50 179,376,781.50 292.50 155,459,877.30 630.00
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD-I : 15 OKTOBER 2018
NO. KONTRAK ADD-I : 66.1 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 1.808.978.000,- SERTIFIKAT : 3
PENYEDIA : CV. BADRANUZA BULAN : NOVEMBER
KONSULTAN : PT. GARIS PUTIH SEJAJAR TANGGAL : 30 NOVEMBER 2018
TAHUN ANGGARAN : 2018 HALAMAN : 4 DARI 5
6.1 (1)(a)Lapis Resap Pengikat - Aspal Cair Liter 1,890.00 - 13,840.40 26,158,356.00 - - - - -
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD-I : 15 OKTOBER 2018
NO. KONTRAK ADD-I : 66.1 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 1.808.978.000,- SERTIFIKAT : 3
PENYEDIA : CV. BADRANUZA BULAN : NOVEMBER
KONSULTAN : PT. GARIS PUTIH SEJAJAR TANGGAL : 30 NOVEMBER 2018
TAHUN ANGGARAN : 2018 HALAMAN : 5 DARI 5
DIVISI 7. STRUKTUR
y
KEMAJUAN FISIK PEKERJAAN
KUANTITAS PEKERJAAN
NOMOR HARGA JUMLAH HARGA S/D BLN LALU BULAN INI S/D BLN INI
MATA URAIAN ITEM PEKERJAAN SATUAN SATUAN PELAKSANAAN
PEMBAYARAN KONTRAK KONTRAK (Rp) (Rp) JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS KUANTITAS
AWAL (ADD - I) (Rp) (Rp)
1 2 3 4 5 6 7=4x6 8 9=8x6 10 11 = 10 x 6 12 = 8 + 10
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
Merdeka No. 24 Meulaboh 23611
RTIFIKAT BULANAN
NOVEMBER
30 NOVEMBER 2018
44,898,000.00
44,898,000.00
70.00
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
Merdeka No. 24 Meulaboh 23611
RTIFIKAT BULANAN
3
NOVEMBER
30 NOVEMBER 2018
36,209,292.27
14,522,256.00
50,731,548.27
21.68
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
Merdeka No. 24 Meulaboh 23611
RTIFIKAT BULANAN
3
NOVEMBER
30 NOVEMBER 2018
278,847,079.88
334,836,658.80
613,683,738.68
100.00
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
Merdeka No. 24 Meulaboh 23611
RTIFIKAT BULANAN
3
NOVEMBER
30 NOVEMBER 2018
-
-
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
Merdeka No. 24 Meulaboh 23611
RTIFIKAT BULANAN
3
NOVEMBER
30 NOVEMBER 2018
-
-
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD-I : 15 OKTOBER 2018
NO. KONTRAK ADD-I : 66.1 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK - ADD. I : Rp. 1.808.978.000,-
TANGGAL KONTRAK ADD II 12 DESEMBER 2018
NOMOR KONTRAK ADD II 66.2 - AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK ADD II Rp 1,933,978,000
SUMBER DANA APBA - OTSUS KAB/KOTA (DOKA) SERTIFIKAT : 1
PENYEDIA CV. BADRANUZA BULAN : DESEMBER
KONSULTAN : PT. GARIS PUTIH SEJAJAR TANGGAL : 31 DESEMBER 2018
TAHUN ANGGARAN : 2018 HALAMAN : 1 DARI 5
DIVISI 1. UMUM
KEMAJUAN FISIK PEKERJAAN
KUANTITAS PEKERJAAN
NOMOR HARGA JUMLAH HARGA S/D BLN LALU BULAN INI S/D BLN INI
MATA URAIAN ITEM PEKERJAAN SATUAN SATUAN PELAKSANAAN
PEMBAYARAN KONTRAK KONTRAK KONTRAK (Rp) (Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS KUANTITAS
AWAL (ADD - I) (ADD - II) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7=4x6 8 9=8x6 10 11 = 10 x 6 12 = 8 + 10 13 = 12 x 6
1.2 Mobilisasi Ls 1.00 1.00 1.00 64,140,000.00 64,140,000.00 0.70 44,898,000.00 0.30 19,242,000.00 1.00 64,140,000.00
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
#REF! : #REF!
SERTIFIKAT : 1
BULAN : DESEMBER
TANGGAL : 31 DESEMBER 2018
HALAMAN : 2 DARI 5
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 1,260.00 207.90 207.90 174,166.87 36,209,292.27 207.90 36,209,292.27 - - 207.90 36,209,292.27
3.3 (1) Penyiapan Badan Jalan M2 4,200.00 4,200.00 4,200.00 3,457.68 14,522,256.00 4,200.00 14,522,256.00 - - 4,200.00 14,522,256.00
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
#REF! : #REF!
SERTIFIKAT : 1
BULAN : DESEMBER
TANGGAL : 31 DESEMBER 2018
HALAMAN : 3 DARI 5
5.1.(1) Lapis Pondasi Agregat Kelas A M3 472.50 472.50 472.50 590,152.55 278,847,079.88 472.50 278,847,079.88 - - 472.50 278,847,079.88
5.1.(2) Lapis Pondasi Agregat Kelas B M3 630.00 630.00 630.00 531,486.76 334,836,658.80 630.00 334,836,658.80 - - 630.00 334,836,658.80
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
#REF! : #REF!
SERTIFIKAT : 1
BULAN : DESEMBER
TANGGAL : 31 DESEMBER 2018
HALAMAN : 4 DARI 5
6.1 (1)(a)Lapis Resap Pengikat - Aspal Cair Liter 1,890.00 2,520.00 2,520.00 13,840.40 34,877,808.00 - - 2,520.00 34,877,808.00 2,520.00 34,877,808.00
6.3(6a) Laston Lapis Antara (AC-BC) Ton 434.70 434.70 434.70 1,436,848.95 624,598,238.57 - - 434.70 624,598,238.57 434.70 624,598,238.57
6.3(8) Bahan Anti Pengelupasan Kg 44.42 44.73 44.73 82,000.00 3,668,089.89 - - 44.73 3,668,089.89 44.73 3,668,089.89
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
SERTIFIKAT BULANAN
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
KONSULTAN : PT. GARIS PUTIH SEJAJAR
TAHUN ANGGARAN : 2018
#REF! : #REF!
SERTIFIKAT : 1
BULAN : DESEMBER
TANGGAL : 31 DESEMBER 2018
HALAMAN : 5 DARI 5
DIVISI 7. STRUKTUR
y
KEMAJUAN FISIK PEKERJAAN
KUANTITAS PEKERJAAN
NOMOR HARGA JUMLAH HARGA S/D BLN LALU BULAN INI S/D BLN INI
MATA URAIAN ITEM PEKERJAAN SATUAN SATUAN PELAKSANAAN
PEMBAYARAN KONTRAK KONTRAK KONTRAK (Rp) (Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS KUANTITAS
AWAL (ADD - I) (ADD - II) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7=4x6 8 9=8x6 10 11 = 10 x 6 12 = 8 + 10 13 = 12 x 6
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 48.74 157.32 228.03 1,607,112.87 366,463,107.47 - - 228.03 366,463,107.47 228.03 366,463,107.47
A N W A R, ST DASRIL, ST ASLIM, ST
NIP. 19730307 200701 1 004 Site Engineer General Superintendent
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
KONTRAK
NOMOR BOBOT REALISASI
MATA URAIAN PEKERJAAN SATUAN VOLUME PEKERJAAN PEKERJAAN
PEMBAYARAN JUMLAH HARGA (%) (%)
AWAL ADD - 1
I DIVISI 1. UMUM
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 1,890.00 - 26,158,356.00 1.59 -
D Dibulatkan 1,808,978,000.00
A N W A R, ST DASRIL, ST RAHMAT, ST
NIP. 19730307 200701 1 004 Site Engineer Wakil Direktur I
Mengetahui/Menyetujui :
KEPALA DINAS
PEKERJAAN UMUM DAN PENATAAN RUANG ACEH
SELAKU PENGGUNA ANGGARAN
Ir. FAJRI, MT
Pembina Tingkat I
NIP. 19640831 199203 1 005
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
KONTRAK
NOMOR BOBOT REALISASI
MATA URAIAN PEKERJAAN SATUAN VOLUME PEKERJAAN PEKERJAAN
PEMBAYARAN JUMLAH HARGA (%) (%)
AWAL ADD - 1
I DIVISI 1. UMUM
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 1,260.00 - 219,450,256.20 13.34 16.50
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 1,890.00 - 26,158,356.00 1.59 -
D Dibulatkan 1,808,978,000.00
A N W A R, ST DASRIL, ST RAHMAT, ST
NIP. 19730307 200701 1 004 Site Engineer Wakil Direktur I
Mengetahui/Menyetujui :
KEPALA DINAS
PEKERJAAN UMUM DAN PENATAAN RUANG ACEH
SELAKU PENGGUNA ANGGARAN
Ir. FAJRI, MT
Pembina Tingkat I
NIP. 19640831 199203 1 005
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
KONTRAK
NOMOR BOBOT REALISASI
MATA URAIAN PEKERJAAN SATUAN VOLUME PEKERJAAN PEKERJAAN
PEMBAYARAN JUMLAH HARGA (%) (%)
AWAL ADD - 1
I DIVISI 1. UMUM
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 1,260.00 - 219,450,256.20 13.34 16.50
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 1,890.00 - 26,158,356.00 1.59 -
D Dibulatkan 1,808,978,000.00
A N W A R, ST DASRIL, ST RAHMAT, ST
NIP. 19730307 200701 1 004 Site Engineer Wakil Direktur I
Mengetahui/Menyetujui :
KEPALA DINAS
PEKERJAAN UMUM DAN PENATAAN RUANG ACEH
SELAKU PENGGUNA ANGGARAN
Ir. FAJRI, MT
Pembina Tingkat I
NIP. 19640831 199203 1 005
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
KONTRAK
NOMOR BOBOT REALISASI
MATA URAIAN PEKERJAAN SATUAN VOLUME PEKERJAAN PEKERJAAN
PEMBAYARAN JUMLAH HARGA (%) (%)
AWAL ADD - 1
I DIVISI 1. UMUM
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 1,260.00 - 219,450,256.20 13.34 16.50
6.1 (1)(a) Lapis Resap Pengikat - Aspal Cair Liter 1,890.00 - 26,158,356.00 1.59 133.33
6.3(6a) Laston Lapis Antara (AC-BC) Ton 434.70 - 624,598,238.57 37.98 100.00
7.1.(8) Beton Mutu sedang fc' = 15 Mpa M3 48.74 - 78,330,681.28 4.76 467.84
D Dibulatkan 1,808,978,000.00
A N W A R, ST DASRIL, ST RAHMAT, ST
NIP. 19730307 200701 1 004 Site Engineer Wakil Direktur I
Mengetahui/Menyetujui :
KEPALA DINAS
PEKERJAAN UMUM DAN PENATAAN RUANG ACEH
SELAKU PENGGUNA ANGGARAN
Ir. FAJRI, MT
Pembina Tingkat I
NIP. 19640831 199203 1 005
MERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
eka No. 24 Meulaboh 23611
PRESTASI
PEKERJAAN
(%)
1.17 37
- 102
0.88 104
- 167
- 169
- 232
- 234
- 236
- 297
2.05
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
RAHMAT, ST
Wakil Direktur I
MERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
eka No. 24 Meulaboh 23611
PRESTASI
PEKERJAAN
(%)
2.73 37
2.20 102
0.88 104
9.08 167
10.91 169
- 232
- 234
- 236
- 297
25.81
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
RAHMAT, ST
Wakil Direktur I
MERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
eka No. 24 Meulaboh 23611
30 NOVEMBER 2018
PRESTASI
PEKERJAAN
(%)
2.73 37
2.20 102
0.88 104
16.96 167
20.36 169
- 232
- 234
- 236
- 297
43.13
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
RAHMAT, ST
Wakil Direktur I
MERINTAH ACEH
UMUM DAN PENATAAN RUANG
ANAN JALAN DAN JEMBATAN
eka No. 24 Meulaboh 23611
31 DESEMBER 2018
PRESTASI
PEKERJAAN
(%)
3.90 37
2.20 102
0.88 104
16.96 167
20.36 169
2.12 232
37.98 234
0.22 236
22.28 297
106.91
Diajukan Oleh:
KONTRAKTOR PELAKSANA
CV. BADRANUZA
RAHMAT, ST
Wakil Direktur I
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
REKAPITULASI KUANTITAS
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
PENYEDIA : CV. BADRANUZA SERTIFIKAT NO. :1
KONSULTAN : PT. GARIS PUTIH SEJAJAR TGL/BLN/THN : 31 AGUSTUS s/d 30 SEPTEM
TAHUN ANGGARAN : 2018
I DIVISI 1. UMUM
BOBOT TERLAKSANA :
A N W A R, ST DASRIL, ST RAHMAT, ST
NIP. 19730307 200701 1 004 Site Engineer Wakil Direktur I
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
REKAPITULASI KUANTITAS
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
PENYEDIA : CV. BADRANUZA SERTIFIKAT NO. :2
KONSULTAN : PT. GARIS PUTIH SEJAJAR TGL/BLN/THN : 31 OKTOBER 2018
TAHUN ANGGARAN : 2018
I DIVISI 1. UMUM
BOBOT TERLAKSANA :
A N W A R, ST DASRIL, ST RAHMAT, ST
NIP. 19730307 200701 1 004 Site Engineer Wakil Direktur I
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
REKAPITULASI KUANTITAS
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
PENYEDIA : CV. BADRANUZA SERTIFIKAT NO. :3
KONSULTAN : PT. GARIS PUTIH SEJAJAR TGL/BLN/THN : 30 NOVEMBER 2018
TAHUN ANGGARAN : 2018
I DIVISI 1. UMUM
BOBOT TERLAKSANA :
A N W A R, ST DASRIL, ST RAHMAT, ST
NIP. 19730307 200701 1 004 Site Engineer Wakil Direktur I
PEMERINTAH ACEH
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
UPTD PELAYANAN JALAN DAN JEMBATAN
Jalan Merdeka No. 24 Meulaboh 23611
REKAPITULASI KUANTITAS
PAKET PEKERJAAN : PEMELIHARAAN JALAN TEUPIN PERAHO - PASI MALI KAB. ACEH BARAT (OTSUS KAB/KOTA)
TANGGAL KONTRAK : 31 AGUSTUS 2018
NO. KONTRAK : 66-AC/UPTD IV/PUPR/APBA/2018
NILAI KONTRAK : Rp. 1.808.978.000,-
PENYEDIA : CV. BADRANUZA SERTIFIKAT NO. :4
KONSULTAN : PT. GARIS PUTIH SEJAJAR TGL/BLN/THN : 31 DESEMBER 2018
TAHUN ANGGARAN : 2018
I DIVISI 1. UMUM
BOBOT TERLAKSANA :
A N W A R, ST DASRIL, ST RAHMAT, ST
NIP. 19730307 200701 1 004 Site Engineer Wakil Direktur I
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
NAN JALAN DAN JEMBATAN
rdeka No. 24 Meulaboh 23611
ITULASI KUANTITAS
BOBOT
(%)
1.17
0.88
2.05
KONTRAKTOR PELAKSANA
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
NAN JALAN DAN JEMBATAN
rdeka No. 24 Meulaboh 23611
ITULASI KUANTITAS
BOBOT
(%)
2.73
2.20
0.88
9.08
10.91
25.81
KONTRAKTOR PELAKSANA
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
NAN JALAN DAN JEMBATAN
rdeka No. 24 Meulaboh 23611
ITULASI KUANTITAS
30 NOVEMBER 2018
BOBOT
(%)
2.73
2.20
0.88
16.96
20.36
43.13
KONTRAKTOR PELAKSANA
EMERINTAH ACEH
UMUM DAN PENATAAN RUANG
NAN JALAN DAN JEMBATAN
rdeka No. 24 Meulaboh 23611
ITULASI KUANTITAS
31 DESEMBER 2018
BOBOT
(%)
3.90
2.20
0.88
16.96
20.36
2.12
37.98
0.22
22.28
106.91
KONTRAKTOR PELAKSANA