Anda di halaman 1dari 17

LAMPIRAN PERHITUNGAN MUTUAL CHECK AWAL

SNVT PELAKSANAAN JARIGAN PEMANFAATAN AIR MALUKU PROVINSI MALUKU


PPK IRIGASI DAN RAWA II (P. SERAM)
PEKERJAAN PENINGKATAN JARINGAN IRIGASI D.I. KAIRATU II, P. SERAM, KAB. SBB (9OO HA)(lanjutan)
TAHUN ANGGARAN 2014

KONTRAK

Harga Jumlah
No. Uraian Pekerjaan Satuan Volume Satuan Harga Bobot
Rp. Rp. %

1 2 3 4 5 6

A PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Ls 1.00 225,000,000.00 225,000,000.00 1.28
2 Jalan Inspeksi m' 3,120.00 279,105.31 870,808,567.20 4.95
3 Pembersihan m2 4,120.00 31,350.17 129,162,700.40 0.73

B PEKERJAAN KONSTRUKSI
1 Kupasan m - -
2 Galian Tanah Biasa Dengan Alat Berat m3 12,719.63 130,071.51 1,654,461,480.74 9.40
3 Timbunan Setempat dipadatkan m3 2,605.19 39,983.06 104,163,468.08 0.59
4 Timbunan Borrow Area m3 1,600.02 214,067.87 342,512,873.36 1.95
5 Beton K-125 m3 4,640.29 1,815,632.50 8,425,061,333.43 47.89
6 Beton K-175 m3 2,593.89 1,846,289.50 4,789,071,871.16 27.22
7 Beton Bertulang k-225 m3 250.01 4,061,150.50 1,015,328,236.51 5.77
8 Bakesting m 124.23 296,015.50 36,774,005.57 0.21
JUMLAH HARGA 17,592,344,536.43 100.00
PPN 10 % 1,759,234,453.64
JUMLAH TOTAL 19,351,578,990.07
DIBULATKAN 19,351,500,000.00

Disetujui Diperiksa Kontraktor Pelaksana


PPK IRIGASI DAN RAWA II DIREKSI LAPANGAN #REF!

J.TUTUARIMA,ST.MSi N. SIMATUPANG #REF!


NIP. 19620930 199103 1 006 NIP. #REF!
UNGAN MUTUAL CHECK AWAL ( 0 % )

NOMOR KONTRAK : HK.02.03/BWS-MAL/SNVT-PJPA/PPK-IR.RW-II/II/01/2014


TANGGAL KONTRAK : '14 Pebruari 2014
KONTRAKTOR : PT. KRISTAL KURNIA JAYA
NILAI KONTRAK : Rp. 19.351.500.000,00

PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME MC 0 %

Jumlah Jumlah Jumlah


Volume Harga Volume Harga Volume Harga Bobot
Rp. Rp. Rp. %

7 9 11 13 15 17 18

- - 1.00 225,000,000.00 1.28


- 920.00 256,776,885.20 2,200.00 614,031,682.00 3.49
- - 4,120.00 129,162,700.40 0.73
-
-
- - - - -
35,758.37 4,651,145,181.04 - 48,478.00 6,305,606,661.78 35.84
3,344.81 133,735,738.92 - 5,950.00 237,899,207.00 1.35
6,058.48 - 7,658.50 1,639,438,782.40 9.32
3,904.58 7,089,278,715.59 735.71 1,335,782,617.84 7.59
343.25 633,738,870.88 2,937.14 5,422,810,742.03 30.82
155.24 630,453,003.62 - 405.25 1,645,781,240.13 9.36
- - 124.23 36,774,005.57 0.21
6,049,072,794.45 7,346,055,600.79 17,592,287,639.14 100.00
604,907,279.45 734,605,560.08 1,759,228,763.91
6,653,980,073.90 8,080,661,160.86 19,351,516,403.05
6,653,900,000.00 8,080,600,000.00 19,351,500,000.00

-
Konsultan Supervisi PANITIA MUTUAL CHECK AWAL ( MC 0% )

1. HARI MUSTAMU, ST, MT Ketua 1`.

2. RIDOLF MUSILA, ST, MT Sekretaris 2. .

3. SIRNELI. SIRINGORINGO, SE Anggota 3.

4. YAN. ALEXANDER SILLOOY Anggota 4. .

5. LA BENNY Anggota 5.
LAMPIRAN PERHIT

SNVT : PELAKSANAAN JARIGAN PEMANFAATAN AIR MALUKU PROVINSI MALUKU


PPK : IRIGASI DAN RAWA II (P. SERAM)
PEKERJAAN : REHABILITASI JARINGAN IRIGASI D.I. SAMAL KANAN; KAB. MALUKU TENGAH; PROV. MALUKU; 2 KM; 600 HA; F; K; SY
LOKASI : P. SERAM, KAB. MALUKU TENGAH
TAHUN ANGGARAN : 2017

KONTRAK SEMULA

NO URAIAN PEKERJAAN
HARGA SATUAN JUMLAH HARGA BOBOT
SATUAN VOLUME
(Rp.) (Rp.) (%)

1 2 3 4 5 6 7

I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Unit 1.00 60,000,000.00 60,000,000.00 0.87
2 Jalan Inspeksi M' 500.00 70,000.00 35,000,000.00 0.51
3 Pembersihan M2 2,000.00 6,000.00 12,000,000.00 0.17
4 Foto Dokumentasi Set 10.00 550,000.00 5,500,000.00 0.08
5 Penggambaran Set 10.00 750,000.00 7,500,000.00 0.11
-
II PEKERJAAN KONSTRUKSI -
1 Dewatering Hari 30.00 960,649.20 28,819,476.00 0.42
2 Dalian Tanah dengan Excavator Jarak Dimuat Jarak 1,0 Km M3 1,397.31 62,034.73 86,681,748.58 1.26
3 Timbunan Tanah Setempat M3 254.00 38,519.25 9,783,889.50 0.14
4 Timbunan Tanah Borrow Area M3 814.36 108,489.98 88,349,900.11 1.28
5 Beton-K125 M3 5,531.00 1,040,787.17 5,756,593,837.27 83.55
6 Beton-K175 M3 156.00 1,143,654.67 178,410,128.52 2.59
7 Beton K-225 M3 224.00 1,245,395.17 278,968,518.08 4.05
8 Bekisting M2 750.00 453,732.50 340,299,375.00 4.94
9 Pembesian (polos/Ulir) 100 Kg Kg 100.00 23,275.43 2,327,543.00 0.03

JUMLAH HARGA 6,890,234,416.06 100.00


PPN 10 % 689,023,441.61
JUMLAH TOTAL 7,579,257,857.67
DIBULATKAN 7,579,257,000.00
-

Disetujui Diperiksa Kontraktor Pelaksana


PPK IRIGASI DAN RAWA II DIREKSI PEKERJAAN PT. BATHARA JAYA SARTIKA

FABIAN PRIANDANI, S.Pd, M.Sc AWALUDIN SARFAN, Amd .................


NIP. 19821212 200812 1 003 NIP. 19660721 200701 1 001 DIREKTUR UTAMA
AN PERHITUNGAN MUTUAL CHECK AWAL ( 0 % )

NOMOR KONTRAK : HK.02.03/BWS-M/SNVT-PJPA/PPK-IR.R


TANGGAL KONTRAK : 30 Januari 2017
NILAI KONTRAK : 7.579.257.000,00
ADD KONTRAK : HK.02.03/BWS-M/SNVT-PJPA/PPK-IR.R
TANGGAL ADD KONTRAK : 10 April 2017
NILAI ADD KONTRAK : 8.337.182.700,00
KONTRAKTOR : BATHARA JAYA SARTIKA

PEKERJAAN TAMBAH PEKERJAAN KURANG KONTRAK BERUBAH

HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA HARGA SATUAN
Volume VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

8 9 10 11 12 13 14 15

- 1.00 60,000,000.00
- 500.00 70,000.00
- 2,000.00 6,000.00
- 10.00 550,000.00
- 10.00 750,000.00
-
-
30.00 960,649.20
8,090.48 62,034.73 501,890,804.405 9,487.79 62,034.73
-
13,854.90 108,489.98 1,503,117,823.90 14,669.26 108,489.98
2,900.75 1,040,787.17 3,019,063,383.38 2,630.25 1,040,787.17
81.00 1,143,654.67 92,636,028.27 75.00 1,143,654.67
139.38 1,245,395.17 173,576,951.82 363.38 1,245,395.17
1,173.00 327,175.00 383,776,275.00 1,923.00 327,175.00
28,100.00 23,275.43 654,039,583.00 28,200.00 23,275.43

Pelaksana PANITIA MUTUAL CHECK AWAL ( MC 0% )


AYA SARTIKA

1. Ketua ...................

2. Sekretaris

3. Anggota ...................
.......
UTAMA 4. Anggota
5. Anggota ..................
: HK.02.03/BWS-M/SNVT-PJPA/PPK-IR.RW-II/I/03/2017

: HK.02.03/BWS-M/SNVT-PJPA/PPK-IR.RW-II/I/03/2017 ADD 01

KONTRAK BERUBAH MENJADI

JUMLAH HARGA BOBOT


(Rp.) (%)

16 18

60,000,000.00 0.87
35,000,000.00 0.51
12,000,000.00 0.17
5,500,000.00 0.08
7,500,000.00 0.11
28,819,476.00 0.42
588,572,552.98 8.54

1,591,467,724.01 23.10
2,737,530,453.89 39.73
85,774,100.25 1.24
452,545,469.90 6.57
629,157,525.00 9.13
656,367,126.00 9.53

6,890,234,428.04 100.00
689,023,442.80
7,579,257,870.84
7,579,257,000.00 ###

-
PANITIA MUTUAL CHECK AWAL ( MC 0% )

....................

....................
LAMPIRAN PERHIT

SNVT : PELAKSANAAN JARIGAN PEMANFAATAN AIR MALUKU PROVINSI MALUKU


PPK : IRIGASI DAN RAWA II (P. SERAM)
PEKERJAAN : REHABILITASI JARINGAN IRIGASI D.I. SAMAL KANAN; KAB. MALUKU TENGAH; PROV. MALUKU; 2 KM; 600 HA; F; K; SY
LOKASI : P. SERAM, KAB. MALUKU TENGAH
TAHUN ANGGARAN : 2017

KONTRAK SEMULA

NO URAIAN PEKERJAAN
HARGA SATUAN JUMLAH HARGA BOBOT
SATUAN VOLUME
(Rp.) (Rp.) (%)

1 2 3 4 5 6 7

I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Unit 1.00 60,000,000.00 60,000,000.00 0.87
2 Jalan Inspeksi M' 500.00 70,000.00 35,000,000.00 0.51
3 Pembersihan M2 2,000.00 6,000.00 12,000,000.00 0.17
4 Foto Dokumentasi Set 10.00 550,000.00 5,500,000.00 0.08
5 Penggambaran Set 10.00 750,000.00 7,500,000.00 0.11
-
II PEKERJAAN KONSTRUKSI -
1 Dewatering Hari 30.00 960,649.20 28,819,476.00 0.42
2 Dalian Tanah dengan Excavator Jarak Dimuat Jarak 1,0 Km M3 1,397.31 62,034.73 86,681,748.58 1.26
3 Timbunan Tanah Setempat M3 254.00 38,519.25 9,783,889.50 0.14
4 Timbunan Tanah Borrow Area M3 814.36 108,489.98 88,349,900.11 1.28
5 Beton-K125 M3 5,531.00 1,040,787.17 5,756,593,837.27 83.55
6 Beton-K175 M3 156.00 1,143,654.67 178,410,128.52 2.59
7 Beton K-225 M3 224.00 1,245,395.17 278,968,518.08 4.05
8 Bekisting M2 750.00 453,732.50 340,299,375.00 4.94
9 Pembesian (polos/Ulir) 100 Kg Kg 100.00 23,275.43 2,327,543.00 0.03

JUMLAH HARGA 6,890,234,416.06 100.00


PPN 10 % 689,023,441.61
JUMLAH TOTAL 7,579,257,857.67
DIBULATKAN 7,579,257,000.00
-

Disetujui Diperiksa
PPK IRIGASI DAN RAWA II DIREKSI PEKERJAAN SNVT PELAKSA

FABIAN PRIANDANI, S.Pd, M.Sc AWALUDIN SARFAN, Amd


NIP. 19821212 200812 1 003 NIP. 19660721 200701 1 001
AN PERHITUNGAN MUTUAL CHECK AWAL ( 0 % )

NOMOR KONTRAK : HK.02.03/BWS-M/SNVT-PJPA/PPK-IR.R


TANGGAL KONTRAK : 30 Januari 2017
NILAI KONTRAK : 7.579.257.000,00
ADD KONTRAK : HK.02.03/BWS-M/SNVT-PJPA/PPK-IR.R
TANGGAL ADD KONTRAK : 10 April 2017
NILAI ADD KONTRAK : 8.337.182.700,00
KONTRAKTOR : BATHARA JAYA SARTIKA

PEKERJAAN TAMBAH PEKERJAAN KURANG KONTRAK BERUBAH

HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA HARGA SATUAN
Volume VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

8 9 10 11 12 13 14 15

- 1.00 60,000,000.00
- 500.00 70,000.00
- 2,000.00 6,000.00
- 10.00 550,000.00
- 10.00 750,000.00
-
-
30.00 960,649.20
8,090.48 62,034.73 501,890,804.405 9,487.79 62,034.73
-
13,854.90 108,489.98 1,503,117,823.90 14,669.26 108,489.98
2,900.75 1,040,787.17 3,019,063,383.38 2,630.25 1,040,787.17
81.00 1,143,654.67 92,636,028.27 75.00 1,143,654.67
139.38 1,245,395.17 173,576,951.82 363.38 1,245,395.17
1,173.00 327,175.00 383,776,275.00 1,923.00 327,175.00
28,100.00 23,275.43 654,039,583.00 28,200.00 23,275.43

Mengetahui Kontraktor Pelaksana


SNVT PELAKSANAAN JARINGAN PELAKSANAAN AIR MALUKU PROVINSI MALUKU PT. BATHARA JAYA SARTIKA

Ir. ....................... .................


NIP. DIREKTUR UTAMA
: HK.02.03/BWS-M/SNVT-PJPA/PPK-IR.RW-II/I/03/2017

: HK.02.03/BWS-M/SNVT-PJPA/PPK-IR.RW-II/I/03/2017 ADD 01

KONTRAK BERUBAH MENJADI

JUMLAH HARGA BOBOT


(Rp.) (%)

16 18

60,000,000.00 0.87
35,000,000.00 0.51
12,000,000.00 0.17
5,500,000.00 0.08
7,500,000.00 0.11
28,819,476.00 0.42
588,572,552.98 8.54

1,591,467,724.01 23.10
2,737,530,453.89 39.73
85,774,100.25 1.24
452,545,469.90 6.57
629,157,525.00 9.13
656,367,126.00 9.53

6,890,234,428.04 100.00
689,023,442.80
7,579,257,870.84
7,579,257,000.00 ###