JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
A LANTAI 1
I PEKERJAAN PERSIAPAN 35.518.537,00
II PEKERJAAN TANAH 25.303.395,00
III PEKERJAAN PASANGAN 660.960.234,91
IV PEKERJAAN ATAP, KUSEN, PINTU DAN JENDELA 128.963.320,17
V PEKERJAAN INSTALASI LISTRIK 11.150.000,00
VI PEKERJAAN PENGECATAN 54.791.175,03
VII PEKERJAAN TANGGA 2 UNIT 32.638.934,29
JUMLAH A 949.325.596,40
B LANTAI 2
I PEKERJAAN PASANGAN 3.038.341.364,52
II PEKERJAAN ATAP, KUSEN, PINTU DAN JENDELA 247.674.152,33
III PEKERJAAN KM/WC DAN INSTALASI AIR 108.535.085,72
IV PEKERJAAN INSTALASI LISTRIK 9.143.000,00
V PEKERJAAN PENGECATAN 163.549.477,97
JUMLAH B 3.567.243.080,54
C LANTAI ATAP
I PEKERJAAN PASANGAN 846.331.074,14
II PEKERJAAN PENGECATAN 45.845.860,94
JUMLAH C 892.176.935,08
D PEMBUATAN POS JAGA ( 2 UNIT )
I PEK. BETONAN DAN PASANGAN 64.566.523,02
II PEKERJAAN ATAP, KUSEN, PINTU DAN JENDELA 3.233.572,66
III PEK. INSTALASI LISTRIK DAN TANGGA 22.275.000,00
IV PEKERJAAN PENGECATAN 3.504.884,85
JUMLAH D 93.579.980,53
JUMLAH (A + B + C + D) 5.502.325.592,55
PPn 10% 550.232.559,26
TOTAL 6.052.558.151,81
DIBULATKAN 6.052.558.000,00
TERBILANG :
ENAM MILYAR LIMA PULUH DUA JUTA LIMA RATUS LIMA PULUH DELAPAN RIBU RUPIAH
DIBUAT :
KONSULTAN PERENCANA
CV. TRI MULYA UTAMA