(HPS)
PEKERJAAN :
LOKASI :
TK NEGERI MEKAR UEESI
KEGIATAN : PERENC. PEMBANGUNAN 1 RUANG KELAS BESERTA PERABOTNYA TK NEGERI MEKAR UEESI
LOKASI : TK NEGERI MEKAR UEESI
SUMBER DANA : DAU
TAHUN ANGGARAN : 2022
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
Tirawuta, 2022
HARGA SATUAN
NO MATERIAL SAT.
(Rp)
1 Pekerja OH Rp 100,000.00
2 Tukang Batu OH Rp 110,000.00
3 Tukang Kayu OH Rp 110,000.00
4 Tukang Besi OH Rp 110,000.00
5 Tukang Cat OH Rp 110,000.00
6 Kepala Tukang OH Rp 120,000.00
7 Mandor OH Rp 125,000.00
DAFTAR HARGA BAHAN/MATERIAL
HARGA SATUAN
NO URAIAN BAHAN/MATERIAL
SAT. (Rp)
A BAHAN DASAR
1 Tanah Urug M3 Rp 50,000.00
2 Sirtu M3 Rp 65,000.00
3 Pasir Urug M3 Rp 170,000.00
4 Pasir Pasang / Kali M3 Rp 250,000.00
5 Pasir Beton M3 Rp 250,000.00
6 Batu Belah/ Batu Gunung M3 Rp 300,000.00
7 Batu Bata Bh Rp 1,100.00
8 Koral Beton/Split 2,3 cm M3 Rp 1,300,000.00
9 Koral Beton/Split 1,2 cm M3 Rp 1,340,000.00
10 Semen Portland (PC) Kg Rp 3,620.00
11 Semen Warna Kg Rp 28,125.00
14 Air Kerja Ltr Rp 50.00
B. BAHAN PENUTUP LANTAI dan DINDING
1 Keramik Lantai KM/WC 20 X20 CM Dos Rp 105,000.00
2 Keramik Dinding 20 X25 CM Dos Rp 4,038.46
3 Keramik Lantai 40 X 40 CM Dos Rp 115,000.00
4 Keramik Lantai 10 X 40 CM Bh Rp 4,791.67
5 Batu tempel Hitam Bh Rp 3,000.00
C BAHAN KAYU
1 Dolken Kayu Dia 8/400 cm Btg Rp 25,000.00
2 Papan Kayu Jati Klas I M3 Rp 3,500,000.00
3 Balok Kayu Bayam Kelas I M3 Rp 3,500,000.00
4 Papan Kayu Klas II M3 Rp 3,000,000.00
5 Balok Kayu Klas II M3 Rp 3,000,000.00
6 Papan / Balok Kayu Meranti Kelas III (Bekistting) M3 Rp 2,000,000.00
7 List kayu profil M1 Rp 22,000.00
D BAHAN LANGIT-LANGIT & PARTISI
1 Aluminium Hollow Galvalum 2 x 4 cm M1 Rp 4,000.00
2 Aluminium Hollow Galvalum 4 x 4 cm M1 Rp 5,300.00
3 Hollow aluminium 2,5 x 3,8 cm M1 Rp 26,000.00
4 Sekrup Rangka plafond / 1000 biji Biji Rp 300.00
5 Kawat Penggantung (Tali Scoor) M1 Rp 8,500.00
6 Calsiboard 3.5 mm Lbr Rp 115,525.00
7 Kalsiplank 8 mm uk. 30 x 240 cm M1 Rp 34,822.92
8 Playwood / Teacwood 9 mm Lbr Rp 238,000.00
E BAHAN ATAP
1 Atap Spandek Tebal 0,35mm M' Rp 91,270.00
2 Nok atap Spandek M' Rp 65,000.00
3 Sekrup atap Bh Rp 11,567.50
4 Rangka baja ringan canal C 75 0.75 M' Rp 25,675.00
5 Rangka baja ringan canal C 75 0.75 Btg Rp 102,700.00
6 Reng Baja Ringan C 35 0.45 M' Rp 17,837.50
7 Talang Jurai M' Rp 44,485.00
8 Baut (Screw driver) Bh Rp 2,085.50
9 Dynabolt Bh Rp 16,270.00
F BAHAN BESI
1 Kawat Beton Kg Rp 42,580.00
2 Besi Beton Polos Kg Rp 22,500.00
3 Besi Beton Ulir Kg Rp 19,500.00
4 Besi Beton Siku 4x4x4 cm M1 Rp 42,881.25
5 Paku Biasa 5" - 10" Kg Rp 36,460.00
6 Paku Tripleks Kg Rp 46,200.00
7 Paku Gipsumboard Kg Rp 80,000.00
8 Paku / Screw / Ramsel Bh Rp 750.00
9 Besi Strip 3 cm, tebal 3 mm M1 Rp 9,750.00
HARGA SATUAN
NO URAIAN BAHAN/MATERIAL
SAT. (Rp)
G BAHAN CAT
1 Plamur tembok boyo 23 Kg Kg Rp 72,250.00
2 Plamir kayu Kg Rp 68,070.00
3 Dempul Kayu impra Kg Rp 77,475.00
4 Cat pewarna impra Kg Rp 71,500.00
5 Clear impra Kg Rp 87,925.00
6 Cat meni Kg Rp 46,125.00
7 Cat tembok eksterior ex. Jotun Sintetic/setara Kg Rp 72,250.00
8 Cat Tembok Interior ex. Jotun Semi sintetic/setara Kg Rp 40,900.00
9 Cat langit - langit ex. Mowilex / setara Kg Rp 40,900.00
10 Cat Plat Beton ex. Nodrop / Setara Kg Rp 72,250.00
11 Cat Kilap Kayu ex. Avian / setara Kg Rp 82,700.00
12 Pengencer / thinner Ltr Rp 46,125.00
13 Lem fox / lem kayu Kg Rp 40,900.00
14 Kuas biasa 3 cm Bh Rp 40,900.00
15 Kuas biasa 4" Bh Rp 46,125.00
16 Kuas biasa 5 cm Bh Rp 51,350.00
17 Kuas Roll Bh Rp 56,575.00
18 Amplas halus Lbr Rp 27,315.00
19 Amplas kasar Lbr Rp 27,315.00
20 Minyak Bekisting Ltr Rp 37,242.50
H BAHAN PENGGANTUNG
1 Handel pintu kaca wire glass 12 Stainless Set Rp 464,125.00
2 Handel pintu aluminium stainless Set Rp 187,200.00
3 Kunci pintu tanam 2x slag stainless Set Rp 176,750.00
4 Kunci tanam putar bulat KW 1 ut. Kamar mandi Bh Rp 98,375.00
5 Grandel Pintu stainless Set Rp 51,350.00
6 Grendel pintu tanam (untuk pintu 2 daun) stainless Set Rp 61,800.00
7 Grendel jendela stainless Set Rp 43,512.50
8 Engsel pintu Stainless Bh Rp 46,125.00
9 Engsel Jendela stainless Bh Rp 43,512.50
10 Kait angin stainless Psg Rp 46,125.00
I BAHAN INSTALASI LISTRIK
1 Lampu 10 watt ex. Philips/setara Bh Rp 77,475.00
2 Lampu 8 watt ex. Philips/setara Bh Rp 72,250.00
3 Stop Kontak ex. Panasonic/setara Bh Rp 51,350.00
4 Saklar ganda 2 modul ex. Panasonic/setara Bh Rp 82,700.00
5 Saklar tunggal ex. Panasonic/setara Bh Rp 51,350.00
6 MCB 6 A 1 O Merlin Gering Bh Rp 124,500.00
7 MCB 10 A 1 O Merlin Gering Bh Rp 124,500.00
8 MCB 16 A 1 O Merlin Gering Bh Rp 124,500.00
9 Box MCB Bh Rp 124,500.00
10 Sekreng Cas (MCB) Bh Rp 281,250.00
11 Kabel NYM 3 x 2,5 mm2 Eterna M1 Rp 33,062.50
12 Kabel NYM 3 x 2,5 mm2 Eterna (100 M) Roll Rp 1,274,000.00
13 Kabel NYY 1x2,5 mm2 Eterna M1 Rp 25,225.00
14 Kabel NYY 4x6 mm2 Eterna M1 Rp 56,575.00
15 Kabel NYY 4 x 6 mm2 Eterna (100 M) Rooll Rp 3,677,500.00
16 Pipa Listrik 1/2 inchi, Ex Clipsal Btg Rp 35,675.00
17 Kee nee Bh Rp 13,135.00
18 Inbow Dos Bh Rp 17,837.50
19 Las DOP Bh Rp 7,135.00
20 Isolasi listrik, Ex Unibell Bh Rp 25,675.00
21 Klem kabel No. 10 Bh Rp 3,045.00
22 Tee Doz 5/8 Ex. Clipsal Bh Rp 30,450.00
HARGA SATUAN
NO URAIAN BAHAN/MATERIAL
SAT. (Rp)
23 Ground Box set Rp 124,500.00
24 Kawat Penghantar M1 Rp 51,350.00
25 Penangkal petir (Tongkat tembaga) Bh Rp 281,250.00
26 Arde Diameter 16 mm Bh Rp 831,500.00
27 Fitting Lampu Standart Broco Bh Rp 40,900.00
J BAHAN SANITER
1 Kloset duduk + Tabung euro ex. Toto/setara Bh Rp 3,544,000.00
2 Kloset Jongkok Bh Rp 388,100.00
3 Jet washer ex. Onda / setara Bh Rp 288,825.00
4 Urinoir ex. Toto/setara Bh Rp 1,767,500.00
5 Bak fiber 70 x 70 cm Set Rp 774,750.00
6 Wastafel top lava ex. Toto/setara Unit Rp 827,000.00
7 Floor Drain Bh Rp 98,600.00
8 Kran air dia 1/2" Biasa ex. Onda/setara Bh Rp 41,125.00
9 Kran Air Ex. Onda Stainless (Wastafel) Bh Rp 41,125.00
10 Seal tape Bh Rp 5,000.00
11 Ijuk M2 Rp 57,500.00
12 Tempat sabun Ex. Onda/setara Bh Rp 45,000.00
13 Ember Penampungan Bh Rp 100,000.00
14 Tangki air 600 Liter ex. Penyu/setara Bh Rp 800,000.00
15 Pompa Air Simutsu pakai tabung Bh Rp 2,133,250.00
16 Pipa PVC Æ 3/4" AW ex. Wavin M1 Rp 66,575.00
17 Pipa PVC Æ 1" AW ex. Wavin M1 Rp 77,025.00
18 Pipa PVC Æ 2" AW ex. Wavin M1 Rp 113,600.00
19 Pipa PVC Æ 3" AW ex. Wavin M1 Rp 218,100.00
20 Pipa PVC Æ 4" AW ex. Wavin M1 Rp 301,700.00
21 Elbow dia 3" Bh Rp 35,000.00
22 Elbow dia 2" Bh Rp 27,000.00
23 Elbow dia 3/4 ' Bh Rp 9,000.00
K BAHAN LAIN - LAIN
1 Pintu Aluminium 60 x 190 cm Pabrikasi Bh Rp 700,000.00
2 Kaca bening 5 mm M2 Rp 210,400.00
3 Kaca bening 8 mm M2 Rp 327,550.00
4 Kaca Ray Ban 5 mm Ex Asahi KW 1 M2 Rp 242,350.00
5 Kaca Ray Ban 8 mm Ex Asahi KW 1 M2 Rp 316,900.00
6 Kaca wire Glass 12 mm Ex. Asahi KW 1 Uk. 1 x 2,3 m Bh Rp 2,969,000.00
7 Kaca wire Glass 12 mm Ex. Asahi KW 1 Uk. 1 x 2,3 m M2 Rp 1,324,750.00
8 Kaca mika akrilik bening 8 mm uk. 122 x 244 cm Lbr Rp 2,170,250.00
9 Kaca mika akrilik bening 8 mm uk. 122 x 244 cm M2 Rp 898,750.00
10 Kaca Cermin 3 mm M2 Rp 199,750.00
11 Silicon Sealant kaca / lem kaca kg Rp 47,455.00
12 karet sealant tube Rp 55,975.00
13 Spider Kaca Bh Rp 93,250.00
14 Sekrup fisher Bh Rp 40,532.50
15 Door Closer Bh Rp 178,450.00
16 Loster Uk. 15 x 20 cm Bh Rp 30,000.00
17 Paving Blok uk. 21 x 10,5 tebal 8 cm K 300 Bh Rp 6,000.00
Paving Blok uk. 21 x 10,5 tebal 8 cm K 300 M2 Rp 300,000.00
18 Kansteen uk. 10 x 25 x 40 cm K 250 Bh Rp 29,600.00
19 Pengelasan Ls Rp 20,000.00
20 Rumput gajah mini M2 Rp 70,000.00
HARGA SATUAN PEKERJAAN PINTU & JENDELA
LEMBAR 3
Penggalian 1 M3 tanah biasa sedalam 1 m'
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 100,000.00 75,000.00
Mandor L.04 OH 0.025 125,000.00 3,125.00
JUMLAH TENAGA KERJA 78,125.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Membuat 1 M3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0.87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 100,000.00 165,000.00
Tukang Batu OH 0.275 110,000.00 30,250.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 208,985.00
B BAHAN
Semen portland Kg 247.000 3,620.00 894,140.00
Pasir beton Kg 0.621 250,000.00 155,178.57
Batu Pecah 2 - 3 cm Kg 0.555 1,300,000.00 721,500.00
Air ltr 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 1,781,568.57
C PERALATAN
Membuat 1 m3 beton mutu f' = 12,2 Mpa (K 150), slump (12 ±2) cm, w/c = 0,72
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 208,985.00
B BAHAN
Semen portland Kg 299.000 3,620.00 1,082,380.00
Pasir beton Kg 0.571 250,000.00 142,678.57
Kerikil (Maks. 30 mm) Kg 0.565 1,300,000.00 734,500.00
Air Ltr 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 1,970,308.57
C PERALATAN
Membuat 1 M3 Lantai Kerja beton mutu f’c = 7,4 MPa (K 100), slump (3 ± 6 ) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.200 100,000.00 120,000.00
Tukang Batu OH 0.200 110,000.00 22,000.00
Kepala Tukang OH 0.020 120,000.00 2,400.00
Mandor OH 0.060 125,000.00 7,500.00
JUMLAH TENAGA KERJA 151,900.00
B BAHAN
Semen portland Kg 230.000 3,620.00 832,600.00
Pasir beton Kg 0.638 250,000.00 159,464.29
Batu Pecah 2 - 3 cm Kg 0.571 1,300,000.00 741,722.22
Air ltr 200.000 50.00 10,000.00
JUMLAH HARGA BAHAN 1,743,786.51
C PERALATAN
Membuat 1 M3 beton mutu f' = 16,9 Mpa (K 200), slump (12 ±2) cm, w/c = 0,61
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 100,000.00 165,000.00
Tukang Batu OH 0.275 110,000.00 30,250.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 208,985.00
B BAHAN
Semen portland Kg 352.000 3,620.00 1,274,240.00
Pasir beton Kg 0.522 250,000.00 130,535.71
Batu Pecah 2 - 3 cm Kg 0.573 1,300,000.00 744,611.11
Air ltr 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 2,160,136.83
C PERALATAN
Membuat 1 M3 beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 100,000.00 165,000.00
Tukang Batu OH 0.275 110,000.00 30,250.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 208,985.00
B BAHAN
Semen portland Kg 371.000 3,620.00 1,343,020.00
Pasir beton Kg 0.499 250,000.00 124,642.86
Batu Pecah 2 - 3 cm Kg 0.582 1,300,000.00 756,166.67
Air ltr 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 2,234,579.52
C PERALATAN
Membuat 1 M3 beton mutu f' = 26,4 Mpa (K 300), slump (12 ±2) cm, w/c = 0,52
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 100,000.00 165,000.00
Tukang Batu OH 0.275 110,000.00 30,250.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 208,985.00
B BAHAN
Semen portland Kg 413.000 3,620.00 1,495,060.00
Pasir beton Kg 0.486 250,000.00 121,607.14
Batu Pecah 2 - 3 cm Kg 0.567 1,300,000.00 737,388.89
Air ltr 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 2,364,806.03
C PERALATAN
Pekerjaan 1 M2 acian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.200 100,000.000 20,000.000
Tukang Kayu OH 0.100 110,000.000 11,000.000
Kepala Tukang OH 0.010 120,000.000 1,200.000
Mandor OH 0.010 125,000.000 1,250.000
JUMLAH TENAGA KERJA 33,450.000
B BAHAN
Semen portland Kg 3.250 3,620.000 11,765.000
JUMLAH HARGA BAHAN 11,765.000
C PERALATAN
Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Cat L.02 OH 0.0090 110,000.00 990.00
Kepala Tukang L.03 OH 0.0060 120,000.00 720.00
Mandor L.04 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 9,085.00
B BAHAN
Cat menie Kg 0.2000 46,125.00 9,225.00
Dempul kayu Kg 0.1500 77,475.00 11,621.25
Cat dasar Kg 0.1700 82,700.00 14,059.00
Cat penutup Kg 0.2600 82,700.00 21,502.00
Kuas Buah 0.0100 40,900.00 409.00
Pemgencer Kg 0.0300 46,125.00 1,383.75
Ampelas Lbr 0.200 27,315.00 5,463.00
JUMLAH HARGA BAHAN 63,663.00
C PERALATAN
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang Cat L.02 OH 0.0630 110,000.00 6,930.00
Kepala Tukang L.03 OH 0.0063 120,000.00 756.00
Mandor L.04 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 10,061.00
B BAHAN
Plamuur Kg 0.1000 72,250.00 7,225.00
Cat dasar Kg 0.1000 20,450.00 2,045.00
Cat penutup Kg 0.2600 40,900.00 10,634.00
JUMLAH HARGA BAHAN 19,904.00
C PERALATAN
Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
Tukang Cat L.02 OH 0.0600 110,000.00 6,600.00
Kepala Tukang L.03 OH 0.0120 120,000.00 1,440.00
Mandor L.04 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 14,415.00
B BAHAN
Cat Kg 0.1000 82,700.00 8,270.00
Kwas Bh 0.1000 46,125.00 4,612.50
Pengencer Liter 0.2600 46,125.00 11,992.50
JUMLAH HARGA BAHAN 24,875.00
C PERALATAN
Pengecatan 1 m2 Dico bidang kayu baru ( 1lapis dempul, 1 lapis cat warna, 2 lapis clear penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang Cat L.02 OH 0.6000 110,000.00 66,000.00
Kepala Tukang L.03 OH 0.0600 120,000.00 7,200.00
Mandor L.04 OH 0.0300 125,000.00 3,750.00
JUMLAH TENAGA KERJA 96,950.00
B BAHAN
Dempul impra/setara Ltr 0.1000 77,475.00 7,747.50
Cat pewarna impra/setara Ltr 0.2600 71,500.00 18,590.00
Clear impra/setara Ltr 0.2600 87,925.00 22,860.50
pengencer/tenner Kg 0.3000 46,125.00 13,837.50
Amplas Lbr 3.0000 27,315.00 81,945.00
Alat bantu dico ls 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
B BAHAN
Galian Tanah M3 0.200 89,843.75 17,968.75
Batu Bata Bh 41.000 1,100.00 45,100.00
Semen Kg 6.480 3,620.00 23,457.60
Pasir Pasang M3 0.026 250,000.00 6,500.00
JUMLAH HARGA BAHAN 93,026.35
C PERALATAN
Pembuatan dan pemasangan 1m3 Kusen pintu dan jendela Kayu Kls. I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 7.0000 100,000.00 700,000.00
Tukang Kayu OH 21.0000 110,000.00 2,310,000.00
Kepala Tukang OH 2.1000 120,000.00 252,000.00
Mandor OH 0.3500 125,000.00 43,750.00
JUMLAH TENAGA KERJA 3,305,750.00
B BAHAN
Balok Kayu M3 1.100 3,500,000.00 3,850,000.00
Paku 10 cm Kg 1.250 36,460.00 45,575.00
Lem Kayu Kg 1.000 40,900.00 40,900.00
-
JUMLAH HARGA BAHAN 3,936,475.00
C PERALATAN
Pembuatan dan pemasangan 1m3 Kusen pintu dan jendela Kayu Kls. II dan III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 6.0000 100,000.00 600,000.00
Tukang Kayu OH 18.0000 110,000.00 1,980,000.00
Kepala Tukang OH 1.8000 120,000.00 216,000.00
Mandor OH 0.3000 125,000.00 37,500.00
JUMLAH TENAGA KERJA 2,833,500.00
B BAHAN
Balok Kayu M3 1.200 3,000,000.00 3,600,000.00
Paku 10 cm Kg 1.250 36,460.00 45,575.00
Lem Kayu Kg 1.000 40,900.00 40,900.00
Pembuatan dan pemasangan 1m2 Daun Pintu panil Kayu Kls. I dan II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.0000 100,000.00 100,000.00
Tukang Kayu OH 3.0000 110,000.00 330,000.00
Kepala Tukang OH 0.3000 120,000.00 36,000.00
Mandor OH 0.0500 125,000.00 6,250.00
JUMLAH TENAGA KERJA 472,250.00
B BAHAN
Papan Kayu M3 0.040 3,500,000.00 140,000.00
Lem Kayu Kg 0.050 40,900.00 2,045.00
Membuat 1 M3 beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 1.650 100,000.00 165,000.00
Tukang Batu OH 0.275 110,000.00 30,250.00
Kepala Tukang OH 0.028 120,000.00 3,360.00
Mandor OH 0.083 125,000.00 10,375.00
JUMLAH TENAGA KERJA 208,985.00
B BAHAN
Semen portland Kg 371.000 3,620.00 1,343,020.00
Pasir beton Kg 0.499 250,000.00 124,642.86
Batu Pecah 2 - 3 cm Kg 0.582 1,300,000.00 756,166.67
Air ltr 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 2,234,579.52
C PERALATAN
Pekerjaan 1 M2 acian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 0.150 100,000.000 15,000.000
Tukang Kayu OH 0.078 110,000.000 8,580.000
Kepala Tukang OH 0.008 120,000.000 960.000
Mandor OH 0.008 125,000.000 1,000.000
JUMLAH TENAGA KERJA 25,540.000
B BAHAN
Semen portland Kg 3.108 3,620.000 11,250.960
JUMLAH HARGA BAHAN 11,250.960
C PERALATAN
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang Cat L.02 OH 0.0630 110,000.00 6,930.00
Kepala Tukang L.03 OH 0.0063 120,000.00 756.00
Mandor L.04 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 10,061.00
B BAHAN
Plamuur Kg 0.1000 72,250.00 7,225.00
Cat dasar Kg 0.1000 40,900.00 4,090.00
Cat penutup Kg 0.2600 40,900.00 10,634.00
JUMLAH HARGA BAHAN 21,949.00
C PERALATAN
Pengecatan 1 m2 Plafond ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang Cat L.02 OH 0.0630 110,000.00 6,930.00
Kepala Tukang L.03 OH 0.0063 120,000.00 756.00
Mandor L.04 OH 0.0030 125,000.00 375.00
JUMLAH TENAGA KERJA 10,061.00
B BAHAN
Plamuur Kg 0.1000 72,250.00 7,225.00
Cat dasar Kg 0.1000 40,900.00 4,090.00
Cat penutup Kg 0.2600 40,900.00 10,634.00
JUMLAH HARGA BAHAN 21,949.00
C PERALATAN
Pembuatan dan pemasangan 1m3 Kusen pintu dan jendela Kayu Kls. I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja OH 7.0000 100,000.00 700,000.00
Tukang Kayu OH 21.0000 110,000.00 2,310,000.00
Kepala Tukang OH 2.1000 120,000.00 252,000.00
Mandor OH 0.3500 125,000.00 43,750.00
JUMLAH TENAGA KERJA 3,305,750.00
B BAHAN
Balok Kayu M3 1.100 3,500,000.00 3,850,000.00
Paku 10 cm Kg 1.250 36,460.00 45,575.00
Lem Kayu Kg 1.000 40,900.00 40,900.00
Pemasangan 1 m2 Rangka Langit-Langit (60 x 60) cm, Kayu Kelas II atau III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang Kayu L.02 OH 0.3000 110,000.00 33,000.00
Kepala Tukang L.03 OH 0.0300 120,000.00 3,600.00
Mandor L.04 OH 0.0100 125,000.00 1,250.00
JUMLAH TENAGA KERJA 57,850.00
B BAHAN
Kaso 5x7 cm M3 0.016 3,000,000.00 48,900.00
Paku 5 - 7 cm kg 0.250 36,460.00 9,115.00
JUMLAH HARGA BAHAN 58,015.00
C PERALATAN