SATUAN KERJA : BAGIAN ADMINISTRASI PEMERINTAHAN UMUM SETDA KAB. KONAWE UTARA
PEKERJAAN : PEMBANGUNAN TAPAL BATAS KECAMATAN ASERA DAN OHEO
LOKASI : KAB. KONAWE UTARA
TAHUN ANGGARAN : 2012
Terbilang :
( Seratus Dua Puluh Lima Juta Rupiah )
SATUAN KERJA : BAGIAN ADMINISTRASI PEMERINTAHAN UMUM SETDA KAB. KONAWE UTARA
PEKERJAAN : PEMBANGUNAN TAPAL BATAS KECAMATAN ASERA DAN OHEO
LOKASI : KAB. KONAWE UTARA
TAHUN ANGGARAN : 2012
Jumlah
Harga Satuan A 10,752.00
B BAHAN
1 Plamir Kg 15,000.00 0.1000 1,500.00
2 Cat dasar Kg 50,000.00 0.1000 5,000.00
3 Cat tembok/penutup 2 X Kg 50,000.00 0.2600 13,000.00
Jumlah 19,500.00
Harga Satuan A + B 25,186.00
B BAHAN
1 Pipa Steanless steal Dia 2" M1 160,000.00 4.8000 768,000.00
2 Pipa Steanless steal Dia 1" M1 80,000.00 4.2000 336,000.00 ###
3 Besi Plat T = 5 mm Kg 14,750.00 0.5000 7,375.00
4 Cat Kg 50,000.00 1.5000 75,000.00
5 Dynabolt dia. 12 mm / Fishe Bh 6,600.00 3.5000 23,100.00
6 Fabrikasi & Erection Ls 50,000.00 1.0000 50,000.00
Jumlah 1,259,475.00
Harga Satuan A + B 1,352,075.00
27 Anl 1 KG PASANG PLAT BESI HURUF
No. Uraian Satuan Harga Kwantitas Jumlah
Satuan Harga
A TENAGA KERJA
1 Tukang Besi Org/Hari 65,000.00 0.0600 3,900.00
2 Kepala Tukang Org/Hari 70,000.00 0.0060 420.00
3 Pekerja Org/Hari 50,000.00 0.6000 30,000.00
4 Mandor Org/Hari 60,000.00 0.3000 18,000.00
Jumlah 52,320.00
B BAHAN
1 Besi plat Kg 14,750.00 1.1000 16,225.00
2 Meni Besi Kg 70,000.00 0.0800 5,600.00
Jumlah 21,825.00
Harga Satuan A + B 74,145.00
HARGA
NO. URAIAN JENIS TENAGA / BAHAN SATUAN
(Rp.)
1 2 3 4
A. UPAH KERJA
1 Mandor OH Rp 60,000.00
2 Kepala tukang OH Rp 70,000.00
3 Tukang Listrik OH Rp 65,000.00
4 Tukang kayu OH Rp 65,000.00
5 Tukang batu OH Rp 65,000.00
6 Tukang besi OH Rp 65,000.00
7 Tukang Cat OH Rp 65,000.00
8 Tukang Gypsum OH Rp 65,000.00
9 Pekerja OH Rp 50,000.00
B. BAHAN DASAR
1 Tanah urug M3 Rp 80,000.00
2 Pasir urug M3 Rp 100,000.00
3 Pasir pasangan M3 Rp 180,000.00
4 Pasir beton M3 Rp 165,000.00
5 Batu belah gunung M3 Rp 165,000.00
6 Koral beton/Split M3 Rp 250,000.00
7 Buis beton dia 20 m panjang 1 meter M1 Rp 54,000.00
8 Semen Portland Kg Rp 1,900.00
9 Semen warna Kg Rp 2,500.00
10 Semen putih Kg Rp 2,500.00
11 Oli ( Pelumas ) Ltr Rp 25,000.00
12 Bahan Bakar solar Ltr Rp 8,000.00
13 Profil Beton m1 Rp 120,000.00
14 Nat / Tali Air Jarak 4cm M2 Rp 84,850.00
D. BAHAN KAYU
1 Dolken kayu dia 10 / 400 Cm Btg. Rp 10,000.00
2 Papan kayu Kls. I Bayam / jati M3 Rp 4,000,000.00
3 Balok kayu Kls. I Bayam / jati M3 Rp 4,000,000.00
4 Papan kayu Kls. II kalapi M3 Rp 2,100,000.00
5 Balok kayu Kls. II kalapi M3 Rp 2,100,000.00
6 Papan kayu Kls. III M3 Rp 1,300,000.00
7 Balok kayu Kls. III M3 Rp 1,300,000.00
8 Papan/balok kayu meranti kelas III (bekisting) M3 Rp 1,100,000.00
G. BAHAN BESI
1 Kawat beton Kg Rp 20,000.00
2 Besi Beton polos Kg Rp 18,000.00
3 Paku biasa 2"-5" Kg Rp 22,000.00
4 Paku sekrup Dos Rp 28,000.00
5 Besi strip Kg Rp 28,600.00
6 Steanless stell Dia 2" M1 Rp 160,000.00
7 Steanless stell Dia 4" M1 Rp 300,000.00
8 Steanless stell Dia 1" M1 Rp 80,000.00
9 Besi Plat Kg Rp 14,750.00
10 Dynabolt dia. 12 mm / Fisher Bh Rp 6,600.00
11 Huruf Stanless stell Kuningan T. 16 cm Set Rp 4,600,000.00
12 Logo Fiberglass Bh Rp 700,000.00
H BAHAN CAT
1 Plamur tembok boyo 23 Kg. Kg. Rp 15,000.00
2 Cat dasar tembok Kg. Rp 50,000.00
3 Cat penutup tembok (anti lumut) Kg. Rp 50,000.00
4 Minyak cat Ltr Rp 37,500.00
5 Kalsium Kg. Rp 6,000.00
6 Soda api Kg Rp 6,000.00
7 Kuas biasa 3 cm Bh. Rp 10,000.00
8 Kuas biasa 4" Bh. Rp 15,000.00
9 Kuas Roll Bh. Rp 25,000.00
10 Ampelas halus Lbr Rp 10,000.00
11 Ampelas kasar Lbr Rp 6,000.00
12 Minyak bekisting Ltr Rp 12,000.00
13 Cat Besi Kg Rp 50,000.00
14 Meni Besi Kg Rp 70,000.00
15 Kapur Tonasa Kg Rp 10,200.00
Terbilang
Terbilang/To say
Terbilang
Terbilang/To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP
Nominal
Nominal Rp. 534,364.000
Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang
Terbilang/To say
Terbilang
Terbilang/To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP
Nominal
U$D. 534,364.000
Nominal
Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang
Terbilang/To say
Terbilang
Terbilang/To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP
Nominal
U$D. 534,364.000
Nominal
No AMOUNTH
001 125,000,000.000
002 Err:540
003 Err:540
004 Err:540
005 Err:540
006 Err:540
007
008
009
ISI KATA > INDONESIA atau FOREIGN
SATTUANG SE.
SATTUANG SE.
SATTUANG SE.
TO SAYED
( Seratus Dua Puluh Lima Juta Rupiah )
Err:540
Err:540
Err:540
Err:540
Err:540
Err:540
Err:540
Err:540
KWITANSI No. 1 ( ( Seratus Dua Puluh Lima Juta Rupiah )
125,000,000.000
125000000 0
125000000.000 0 0 0
0 MILYAR
0.000 0
0 0 0
BILLION AND 0 Juta
0
000 0 0 0
000000.000 0
Lima 0 0 0
MILLION AND 0 Ribu
0.000 0
0 0 0
MILLION AND 0 Ribu
0
000 0 0 0
000.000 0
0 0 0
THOUSAND AND
0 0
0.000 0
0 0 0
THOUSAND AND
0
000 0 0 0
0
0 0 0
0 0
000 0 0 0
0
0 0 0
0 0
0
SATUAN
ANGKA
1
2
3
4
5
6
7
8
9
PULUHAN
ANGKA
1
2
3
4
5
6
7
8
9
BELASAN
ANGKA
10
11
12
13
14
15
16
17
18
19
Koma KOMMA
Rupiah Rupiah ) DOLAR
RATUSAN
ANGKA
1
2
### Koma KOMMA 3
Rupiah Rupiah ) DOLAR 4
5
6
7
8
### Koma KOMMA 9
Rupiah Rupiah ) DOLAR
Koma KOMMA
Rupiah Rupiah ) DOLAR
Satu Satu ONE
Dua Dua TWO
Tiga Tiga THREE
Empat Empat FOUR
Lima Lima FIVE
Enam Enam SIX
Tujuh Tujuh SEVEN
Delapan Delapan EIGHT
Sembilan Sembilan NINE
A. b c d
1 Mandor OH Rp 65,000.00
2 Kepala tukang OH Rp 75,000.00
3 Tukang Listrik OH Rp 65,000.00
4 Tukang Las OH Rp 65,000.00
5 Tukang kayu OH Rp 65,000.00
6 Tukang batu OH Rp 65,000.00
7 Tukang besi OH Rp 65,000.00
8 Tukang Cat OH Rp 65,000.00
9 Pekerja OH Rp 50,000.00
A. BAHAN DASAR
1 Tanah urug M3 Rp 80,000.00
2 Pasir urug M3 Rp 100,000.00
3 Pasir pasangan M3 Rp 160,000.00
4 Pasir beton M3 Rp 165,000.00
5 Batu belah gunung M3 Rp 160,000.00
6 Batu bata Bh Rp 650.00
7 Koral beton/Split 2 - 3Cm M3 Rp 250,000.00
8 Koral beton/Split 5 - 7Cm M3 Rp 245,000.00
9 Kerikil sungai M3 Rp 200,000.00
10 Sirtu M3 Rp 110,000.00
11 Buis beton dia 20 Cm panjang 1 meter M1 Rp 50,000.00
12 Semen Portland Kg Rp 1,900.00
13 Semen warna Kg Rp 1,800.00
14 Semen putih Kg Rp 1,800.00
B. BAHAN LANTAI
1 Tegel keramik Roman 40x40 cm Bh Rp 11,800.00
2 Tegel keramik Roman 40x40 cm anti slip Bh Rp 11,800.00
3 Tegel keramik 20x20 cm anti slip Bh Rp 5,275.00
4 Tegel keramik 20x25 cm Corak Warna Bh Rp 5,450.00
5 Tegel keramik 10 x 40 cm Bh Rp 5,975.00
C. BAHAN KAYU
1 Dolken kayu dia 10 / 400 Cm Btg. Rp 9,000.00
2 Papan kayu Kls I Bayam / Jati M3 Rp 4,000,000.00
3 Balok kayu Kls I Bayam / Jati M3 Rp 4,000,000.00
4 Papan kayu Kls II M3 Rp 2,100,000.00
5 Balok kayu Kls II M3 Rp 2,100,000.00
6 Papan kayu Kls III M3 Rp 1,300,000.00
7 Balok kayu Kls III M3 Rp 1,300,000.00
8 Papan/balok kayu (bekisting) M3 Rp 1,100,000.00
D. BAHAN LANGIT-LANGIT
1 Tripleks 1220 x 2440 x 0,3 mm Lbr Rp 65,000.00
2 Plywood 9 mm Lbr Rp 120,000.00
3 List Tripleks M' Rp 3,000.00
E. BAHAN ATAP
1 Plastik Bubungan M' Rp 20,000.00
2 Alumunium Voil M' Rp 7,000.00
3 Seng Gelombang Besar BJLS 20 Kaki Rp 8,500.00
4 Seng Gelombang Besar BJLS 20 (6 Kaki) Lembar Rp 51,000.00
5 Seng Plat Bjls 0.22 M' Rp 60,000.00
F. BAHAN BESI
1 Kawat beton Kg Rp 20,000.00
2 Besi Beton polos Kg Rp 18,000.00
3 Besi Siku Kg Rp 18,000.00
4 Paku biasa 5"-10" Kg Rp 22,000.00
5 Paku Sakura Roof Kg Rp 20,000.00
5 Paku seng Kg Rp 22,500.00
6 Paku tripleks Kg Rp 28,000.00
7 Paku Sekrup Kg Rp 28,000.00
8 Besi strip Kg Rp 28,600.00
G. BAHAN CAT
1 Plamur tembok Kg. Rp 15,000.00
2 Plamir kayu Kg. Rp 15,000.00
3 Cat dasar kayu Kg. Rp 40,000.00
4 Cat dasar tembok Kg Rp 30,000.00
5 Cat tembok Metro Lite Kg Rp 30,000.00
6 Cat kayu kilap Avian Kg. Rp 40,000.00
7 Cat Pelitur Kg. Rp 55,000.00
8 Cat atap seng Ex. Aga Kg Rp 70,000.00
9 Minyak cat Ltr Rp 37,000.00
10 Lem fox/ lem kayu Kg. Rp 22,000.00
11 Kuas biasa 5 cm Bh. Rp 17,500.00
12 Kuas Roll Bh. Rp 20,000.00
13 Ampelas halus Lbr Rp 9,500.00
14 Ampelas kasar Lbr Rp 2,500.00
15 Meni besi Kg Rp 70,000.00
16 Meni kayu Kg Rp 13,000.00
17 Minyak bekisting Ltr Rp 12,000.00
18 Residu Ltr Rp 9,000.00
H. BAHAN PENGGANTUNG
1 Kunci Tanam 2x Putar Bh. Rp 105,000.00
2 Grendel Tanam Bh. Rp 11,500.00
3 Engsel Pintu H Kuningan Bh. Rp 18,500.00
4 Engsel jendela Standart Bh. Rp 16,000.00
5 Pengangan Pintu Stainless Stell Bh. Rp 300,000.00
6 Door Closer Bh. Rp 300,000.00
7 Hak Angin Standart Bh. Rp 8,500.00
I. BAHAN KACA
1 Kaca bening 5 mm M2 Rp 120,000.00
2 Kaca Rayban 5 mm M2 Rp 150,000.00
3 Lem sealent Kg Rp 84,500.00
J. BAHAN INSTALASI LISTRIK
1 Lampu SL 20 Watt+philips down light Bh. Rp 85,000.00
2 Lampu Pijar 25 Watt Bh. Rp 29,500.00
3 Instalasi titik lampu Titik Rp 125,000.00
4 Saklar Tunggal Ex. Clipsal Bh. Rp 26,000.00
5 Saklar tunggal Ex.Broco Bh. Rp 23,000.00
6 Stop Kontak Close Ex.Broco Bh. Rp 27,000.00
7 Saklar ganda broco Bh. Rp 13,500.00
8 MCB 63 A 1 o Merlin Gering Bh. Rp 220,000.00
9 Stik Bh. Rp 1,250.00
10 Klem Bh. Rp 2,500.00
11 Panel Box Bh. Rp 300,000.00
12 KWH meter Bh. Rp 550,000.00
K. BAHAN SANITER
1 Kloset jongkok porselin Bh. Rp 130,000.00
2 Pasangan Bak KM / WC (Fiber) Bh. Rp 300,000.00
3 Floor drain Bh. Rp 15,000.00
4 Kran. Dia 1/2" Bh. Rp 17,000.00
5 Seal tape Bh. Rp 6,000.00
6 Stop Kran Btg. Rp 35,000.00
7 Pek. Septick Tank Bh. Rp 2,500,000.00
8 Pipa PVC Æ 1/2'' AW M1 Rp 5,700.00
9 Pipa PVC Æ 2 '' AW M1 Rp 16,250.00
10 Pipa PVC Æ 4 '' AW M1 Rp 35,800.00
-
Dibuat Oleh,-
ULP / PEJABAT PENGADAAN
Dibuat Oleh,-