Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang
Terbilang/To say
Terbilang
Terbilang/To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP
Nominal
Nominal Rp. 534,364.000
Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang
Terbilang/To say
Terbilang
Terbilang/To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP
Nominal
U$D. 534,364.000
Nominal
Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang
Terbilang/To say
Terbilang
Terbilang/To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP
Nominal
U$D. 534,364.000
Nominal
No AMOUNTH
001 722,862,000.000
002 Err:540
003 Err:540
004 Err:540
005 Err:540
006 Err:540
007
008
009
ISI KATA > INDONESIA atau FOREIGN
SATTUANG SE.
SATTUANG SE.
SATTUANG SE.
TO SAYED
( Tujuh Ratus Dua Puluh Dua Juta Delapan Ratus Enam Puluh Dua Ribu Rupiah )
Err:540
Err:540
Err:540
Err:540
Err:540
Err:540
Err:540
Err:540
KWITANSI No. 1 ( ( Tujuh Ratus Dua Puluh Dua Juta Delapan Ratus Enam Puluh Dua Ribu Rupiah )
722,862,000.000
722862000 0
722862000.000 0 0 0
0 MILYAR
0.000 0
0 0 0
BILLION AND 0 Juta
0
862 8 6 2 Delapan Ratus Enam Puluh Dua Ribu
862000.000 0
Dua 8 6 2 Delapan Ratus Enam Puluh
MILLION AND 16 Ribu Ribu
0.000 0
0 0 0
MILLION AND 0 Ribu
0
000 0 0 0
000.000 0
Dua 0 0 0
THOUSAND AND
0 0
0.000 0
0 0 0
THOUSAND AND
0
000 0 0 0
0
0 0 0
0 0
000 0 0 0
0
0 0 0
0 0
0
SATUAN
ANGKA
1
2
3
4
5
6
7
8
9
PULUHAN
ANGKA
1
2
3
4
5
6
7
8
9
BELASAN
ANGKA
10
11
12
13
14
15
16
17
18
19
Koma KOMMA
Rupiah Rupiah ) DOLAR
RATUSAN
ANGKA
1
2
### Koma KOMMA 3
Rupiah Rupiah ) DOLAR 4
5
6
7
8
### Koma KOMMA 9
Rupiah Rupiah ) DOLAR
Koma KOMMA
Rupiah Rupiah ) DOLAR
Satu Satu ONE
Dua Dua TWO
Tiga Tiga THREE
Empat Empat FOUR
Lima Lima FIVE
Enam Enam SIX
Tujuh Tujuh SEVEN
Delapan Delapan EIGHT
Sembilan Sembilan NINE
TERBILANG : ( Tujuh Ratus Dua Puluh Dua Juta Delapan Ratus Enam Puluh Dua Ribu Rupiah )
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SATUAN
(Rp.)
1 2 3.00 4 5
A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.00 Ls 1,500,000.00
2 Pembuatan Barak Kerja dan Gudang Bahan 1.00 Ls 2,000,000.00
3 Pengukuran dan Pasang Bouwplank 1.00 Ls 1,000,000.00
4 Dokumentasi & Administrasi 1.00 Ls 3,000,000.00
5 Penyediaan air kerja & P3K 1.00 Ls 2,500,000.00
6 Papan Nama Proyek 1.00 Ls 350,000.00
Jumlah Harga A (Dipindahkan Ke Rekapitulasi)
B PEMBANGUNAN RUMAH JABATAN CAMAT
I PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Tipe A 122.05 M3 39,125.00
2 Pek. Galian Tanah Pondasi Tipe B 5.15 M3 39,125.00
3 Pek. Urugan Tanah Alur Pondasi Tipe A 28.01 M3 13,020.00
4 Pek. Urugan Tanah Alur Pondasi Tipe B 1.29 M3 13,020.00
5 Pek. Urugan Pasir Alas Pondasi Tipe A 13.28 M3 135,650.00
6 Pek. Urugan Pasir Alas Pondasi Tipe B 0.72 M3 135,650.00
7 Pek. Urugan Tanah Alas Lantai 74.02 M3 117,650.00
8 Pek. Urugan Pasir Alas Lantai 19.53 M3 135,650.00
Jumlah Harga B-I (Dipindahkan Ke Rekapitulasi)
II PEKERJAAN BATU, PASANGAN DAN PLESTERAN
1 Pek. Batu Kosong Pondasi Tipe A 26.56 M3 320,810.00
2 Pek. Batu Kosong Pondasi Tipe B 2.16 M3 320,810.00
3 Pek. Pasangan Pondasi Batu Gunung Tipe A 1 : 5 42.23 M3 677,695.00
4 Pek. Pasangan Pondasi Batu Gunung Tipe B 1 : 5 3.90 M3 677,695.00
5 Pek. Pasangan Bata Merah 1 : 5 505.28 M2 95,255.00
6 Pek. Pasangan Trasram 1 : 3 44.28 M2 103,228.00
7 Pek. Plesteran Dinding Tembok 1 : 5 1,010.56 M2 41,379.60
8 Pek. Plesteran Trasram 1 : 3 88.56 M2 45,764.40
9 Pek. Plesteran Beton 1 : 3 8.61 M2 45,764.40
Jumlah Harga B-II (Dipindahkan Ke Rekapitulasi)
III PEKERJAAN BETON
1 Pek. Kolom 30/40 cm, 1 : 2 : 3 2.04 M3 5,842,750.00
2 Pek. Kolom 25/25 cm, 1 : 2 : 3 0.75 M3 5,842,750.00
3 Pek. Kolom Praktis 11/11 cm, 1 : 2 : 3 211.00 M1 138,405.00
4 Pek. Sloof Beton 15/20 cm, 1 : 2 : 3 4.98 M3 4,231,400.00
5 Pek. Ringbalk 15/15 cm, 1 : 2 : 3 203.50 M1 102,615.00
6 Pek. Atap Plat Beton T. 10 cm 5.75 M3 3,965,275.00
7 Pek. Balok Latei 10/10 cm, 1 : 2 : 3 48.00 M1 102,615.00
Jumlah Harga B-III (Dipindahkan Ke Rekapitulasi)
IV PEKERJAAN KAP, KUDA-KUDA DAN ATAP
1 Pek. Kuda-kuda (Kayu Kls II) 4.98 M3 4,169,600.00
2 Pek. Gording dan Jurai (Kayu Kls II) 3.99 M3 3,355,800.00
3 Pek. Kaso dan Reng 594.79 M2 49,475.00
4 Pek. Papan Lisplank Kayu Silae 2x(3/20) 126.35 M1 68,070.00
5 Pek. Atap Sakura Roof 540.72 M2 115,415.00
6 Pek. Nok Sakura Roof 73.85 M1 138,970.00
7 Pek. Talang Seng Plat BJLS 30 24.22 M1 112,031.25
Jumlah Harga B-IV (Dipindahkan Ke Rekapitulasi)
V PEKERJAAN KUSEN,DAUN PINTU/JENDELA/KACA
1 Pek. Kusen Pintu, Jendela & Ventilasi (Kayu Klas II) 2.82 M3 4,532,000.00
2 Pek. Daun Pintu Panil (Kayu Klas I) 29.52 M2 394,500.00
3 Pek. Bingkai Jendela (Kayu Klas I) 28.12 M2 254,795.00
4 Pek. Pas. Kaca Bening 5 mm 27.66 M2 162,440.00
5 Pasangan Angker Kusen 1.00 Ls 300,000.00
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SATUAN
(Rp.)
1 2 3.00 4 5
Jumlah Harga B-V (Dipindahkan Ke Rekapitulasi)
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SATUAN
(Rp.)
1 2 3.00 4 5
VI PEKERJAAN LANTAI & RABAT BETON
1 Pas.Tegel Keramik 40/40 cm 1:5 257.40 M2 126,507.10
2 Pas.Tegel Dinding Keramik (KM/WC) 20/25 cm 1:5 59.70 M2 209,016.54
3 Pas.Tegel Plint 10/40 cm 1:5 196.70 M1 29,956.51
4 Pas.Tegel Anti Slip Motif (Carport) 40/40 cm 1:5 16.00 M2 188,995.50
5 Pas.Tegel Anti Slip (KM/WC/Tempat Cuci) 20/20 cm 1:3 2.25 M2 207,186.54
6 Pek. Rabat Beton Lantai 1:3:5 19.53 M3 842,425.00
Jumlah Harga B-VI (Dipindahkan Ke Rekapitulasi)
VII PEKERJAAN INSTALASI LISTRIK
1 Pas. Instalasi Titik Lampu Titik 135,000.00
2 Pas. Fitting Plafond Standar Bh 23,000.00
3 Pas. Fiting dan Lampu Downlight 25 watt Bh 150,000.00
4 Pas. Lampu SL 20 watt Bh 65,000.00
5 Pas. Lampu SL 8 watt Bh 35,000.00
6 Pas. Stop Kontak Merk Broco Bh 29,000.00
7 Pas. Saklar ganda Merk Broco Bh 23,000.00
8 Pas. Saklar Tunggal Merk Broco Bh 20,000.00
9 Pas. MCB Bh 220,000.00
Jumlah Harga B-VII (Dipindahkan Ke Rekapitulasi)
VIII PEKERJAAN PENGGANTUNG / PENGUNCI
1 Pas. Kunci Pintu 18.00 Bh 288,945.00
2 Pas. Engsel Pintu Kuningan 60.00 Bh 30,190.00
3 Pas. Engsel Jendela 62.00 Bh 27,515.00
4 Pas. Grendel Pintu Kuningan 16.00 Bh 45,565.00
5 Pas. Grendel Pintu Dua Daun Kuningan 4.00 Bh 60,565.00
6 Pas. Grendel Jendela Kuningan 31.00 Bh 33,065.00
7 Pas. Kait Angin 31.00 Bh 20,690.00
Jumlah Harga B-VIII (Dipindahkan Ke Rekapitulasi)
IX PEKERJAAN RANGKA PLAFOND & PLAFOND
1 Pek. Rangka Plafond (Kayu Klas II) 344.25 M2 74,400.00
2 Pek. Plafond Tripleks 3 mm 344.25 M2 39,665.00
3 Pek. List Plafond Kayu Profil 377.20 M1 23,850.00
Jumlah Harga B-VI (Dipindahkan Ke Rekapitulasi)
X PEKERJAAN PENGECETAN / FINISHING
1 Pek. Cat/Plamur Dinding Tembok (3x jalan) 1,048.03 M2 19,030.00
2 Pek. Cat Plafond diplamur (3x jalan) 344.25 M2 19,030.00
3 Pek. Cat Kilap Kusen Pintu, Jendela & Ventilasi 81.86 M2 27,497.50
4 Pek. Cat Kilap Lisplank dan Jalusi 37.90 M2 27,497.50
5 Pek. Vernis Daun Pintu/Jendela 115.28 M2 20,837.50
Jumlah Harga B-X (Dipindahkan Ke Rekapitulasi)
XI PEKERJAAN SANITASI
1 Pek. Pas. Klosed Jongkok 6.00 Bh 208,550.00
2 Pek. Pas. Bak Fiberglas 6.00 Bh 375,000.00
3 Pek. Pas. Wastafel 2.00 Bh 521,200.00
4 Pek. Pas. Kran Air 9.00 Bh 36,225.00
5 Pek. Pas. Floor Drain 7.00 Bh 23,075.00
6 Pek. Pas. Tempat Sabun Tanam Ex. KIA 7.00 Bh 19,000.00
7 Pek. Pas. Instalasi Air Bersih dan Air Kotor
a. Pek. Pas. Instalasi Air Kotor (Pipa PVC Ǿ 4 ") 42.00 M1 69,129.00
b. Pek. Pas. Instalasi Air Kotor (Pipa PVC Ǿ 2 ") 10.50 M1 36,138.00
c. Pek. Pas. Instalasi Air Bersih (Pipa PVC Ǿ 1/2 ") 76.50 M1 16,497.00
8 Pek. Septicktank 3.00 Unit 1,500,000.00
Jumlah Harga B-XI (Dipindahkan Ke Rekapitulasi)
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SATUAN
(Rp.)
1 2 3.00 4 5
XII PEKERJAAN SALURAN DAN LAIN-LAIN
1 Pek. Galian Tanah Saluran M3 39,125.00
2 Pek. Urugan Pasir M3 135,650.00
3 Pek. Pas. Saluran Air Hujan M1 131,280.33
4 Pek. Rabat Beton Keliling Bangunan 1:2:3 M3 842,425.00
5 Pek. Pembersihan Akhir 1.00 Ls 1,000,000.00
Jumlah Harga B-XII (Dipindahkan Ke Rekapitulasi)
-
Wanggudu, April 2012
Disetujui Oleh : Dibuat Oleh,-
PEJABAT PEMBUAT KOMITMEN (PPK) : Konsultan Perencana :
BAGIAN ADMINISTRASI PEMERINTAHAN UMUM CV. TEKNIK CIPTA PARISUDHA
SETDA KAB. KONAWE UTARA
JUMLAH HARGA
(Rp.)
6
1,500,000.00
2,000,000.00
1,000,000.00
3,000,000.00
2,500,000.00
350,000.00
10,350,000.00
4,775,206.25
201,493.75
364,690.20
16,795.80
1,801,432.00
97,668.00
8,708,453.00
2,649,244.50
18,614,983.50
8,520,713.60
692,949.60
28,619,059.85
2,643,010.50
48,130,446.40
4,570,935.84
41,816,568.58
4,052,895.26
394,031.48
139,440,611.11
11,919,210.00
4,382,062.50
29,203,455.00
21,072,372.00
20,882,152.50
22,800,331.25
4,925,520.00
115,185,103.25
20,764,608.00
13,389,642.00
29,427,235.25
8,600,644.50
62,407,198.80
10,262,934.50
2,713,396.88
147,565,659.93
12,757,580.00
11,645,640.00
7,164,835.40
4,493,090.40
300,000.00
JUMLAH HARGA
(Rp.)
6
36,361,145.80
JUMLAH HARGA
(Rp.)
6
32,562,927.54
12,478,287.44
5,892,445.52
3,023,928.00
466,169.72
16,452,560.25
70,876,318.46
-
-
-
-
-
-
-
-
-
-
5,201,010.00
1,811,400.00
1,705,930.00
729,040.00
242,260.00
1,025,015.00
641,390.00
11,356,045.00
25,612,200.00
13,654,676.25
8,996,220.00
48,263,096.25
19,944,010.90
6,551,077.50
2,250,945.35
1,042,292.74
2,402,147.00
32,190,473.49
1,251,300.00
2,250,000.00
1,042,400.00
326,025.00
161,525.00
133,000.00
2,903,418.00
379,449.00
1,262,020.50
4,500,000.00
14,209,137.50
JUMLAH HARGA
(Rp.)
6
-
-
-
-
1,000,000.00
1,000,000.00
-
Wanggudu, April 2012
Dibuat Oleh,-
Konsultan Perencana :
CV. TEKNIK CIPTA PARISUDHA
37,500.00
1,625.00
39,125.00
12,500.00
520.00
13,020.00
102,000.00
15,000.00
650.00
117,650.00
120,000.00
15,000.00
650.00
135,650.00
198,000.00
383,800.00
87,300.00
75,000.00
39,000.00
4,500.00
4,875.00
792,475.00
198,000.00
258,400.00
97,920.00
75,000.00
39,000.00
4,500.00
4,875.00
677,695.00
216,000.00
35,000.00
39,000.00
25,350.00
2,925.00
2,535.00
320,810.00
45,500.00
27,303.00
7,200.00
15,000.00
6,500.00
750.00
975.00
103,228.00
45,500.00
18,430.00
8,100.00
15,000.00
6,500.00
750.00
975.00
95,255.00
18,088.00
3,780.00
15,000.00
9,750.00
1,125.00
975.00
48,718.00
14,774.40
4,140.00
15,000.00
9,750.00
1,125.00
975.00
45,764.40
9,849.60
4,680.00
15,000.00
9,750.00
1,125.00
975.00
41,379.60
152.00
2,500.00
325.00
4,500.00
650.00
8,127.00
91,488.83
34,102.60
5,688.90
131,280.33
2,640,000.00
350,000.00
1,365,000.00
157,500.00
19,500.00
4,532,000.00
160,000.00
50,000.00
162,500.00
18,750.00
3,250.00
394,500.00
78,400.00
6,600.00
6,600.00
45,000.00
50,000.00
162,500.00
18,750.00
3,250.00
371,100.00
120,000.00
3,300.00
40,000.00
130,000.00
15,000.00
2,600.00
310,900.00
160,000.00
17,500.00
68,250.00
7,875.00
1,170.00
254,795.00
2,640,000.00
429,000.00
17,600.00
200,000.00
780,000.00
90,000.00
13,000.00
4,169,600.00
2,640,000.00
66,000.00
120,000.00
468,000.00
54,000.00
7,800.00
3,355,800.00
33,600.00
3,300.00
5,000.00
6,500.00
750.00
325.00
49,475.00
5,500.00
38,400.00
7,500.00
16,250.00
1,875.00
4,875.00
74,400.00
26,250.00
840.00
5,000.00
6,500.00
750.00
325.00
39,665.00
36,250.00
1,320.00
7,500.00
16,250.00
1,875.00
4,875.00
68,070.00
21,000.00
220.00
1,050.00
1,365.00
150.00
65.00
23,850.00
414,200.00
96,200.00
226,200.00
82,500.00
16,250.00
1,875.00
5,200.00
842,425.00
480,000.00
70,400.00
22,400.00
2,850,000.00
60,000.00
613,700.00
96,200.00
202,800.00
360,000.00
245,000.00
160,000.00
295,000.00
22,750.00
214,500.00
91,000.00
42,750.00
16,250.00
5,842,750.00
528,000.00
70,400.00
22,400.00
1,900,000.00
45,000.00
613,700.00
96,200.00
202,800.00
196,000.00
160,000.00
290,000.00
22,750.00
182,000.00
68,250.00
31,500.00
12,025.00
4,441,025.00
384,000.00
70,400.00
22,400.00
1,900,000.00
45,000.00
613,700.00
96,200.00
202,800.00
160,000.00
242,500.00
22,750.00
101,400.00
68,250.00
24,825.00
11,050.00
3,965,275.00
2,400.00
33,000.00
5,600.00
2,850,000.00
45,000.00
613,700.00
96,200.00
202,800.00
195,000.00
67,600.00
22,750.00
68,250.00
18,375.00
10,725.00
4,231,400.00
3,600.00
440.00
68,400.00
1,000.00
10,450.00
1,665.00
3,900.00
5,000.00
2,145.00
2,145.00
2,145.00
750.00
975.00
102,615.00
2,400.00
220.00
44,800.00
57,000.00
9,000.00
7,600.00
1,110.00
2,340.00
9,000.00
1,300.00
1,300.00
1,300.00
450.00
585.00
138,405.00
1,200.00
220.00
440.00
20.00
5,700.00
925.00
10,000.00
5,000.00
2,145.00
2,145.00
2,145.00
750.00
325.00
31,015.00
89,100.00
9,000.00
10,000.00
6,500.00
750.00
65.00
115,415.00
112,500.00
2,250.00
12,500.00
9,750.00
1,125.00
845.00
138,970.00
30,000.00
675.00
47,500.00
3,900.00
2,000.00
26,000.00
1,875.00
81.25
112,031.25
125,000.00
11,400.00
1,800.00
15,000.00
48,750.00
5,625.00
975.00
208,550.00
300,000.00
36,000.00
11,400.00
1,800.00
60,000.00
94,250.00
11,250.00
6,500.00
521,200.00
28,000.00
150.00
500.00
6,500.00
750.00
325.00
36,225.00
15,000.00
500.00
6,500.00
750.00
325.00
23,075.00
19,000.00
500.00
6,500.00
750.00
325.00
27,075.00
250,000.00
2,500.00
32,500.00
3,750.00
195.00
288,945.00
260,000.00
500.00
32,500.00
750.00
325.00
294,075.00
18,500.00
750.00
9,750.00
1,125.00
65.00
30,190.00
19,700.00
500.00
6,500.00
750.00
65.00
27,515.00
17,500.00
1,000.00
13,000.00
1,500.00
65.00
33,065.00
30,000.00
1,000.00
13,000.00
1,500.00
65.00
45,565.00
45,000.00
1,000.00
13,000.00
1,500.00
65.00
60,565.00
9,000.00
750.00
9,750.00
1,125.00
65.00
20,690.00
143,000.00
1,250.00
16,250.00
1,875.00
65.00
162,440.00
75,000.00
18,620.00
7,560.00
2,882.10
12,500.00
8,125.00
975.00
845.00
126,507.10
98,125.00
21,660.00
7,560.00
3,325.50
31,000.00
22,750.00
2,625.00
1,950.00
188,995.50
13,250.00
2,280.00
7,200.00
66.51
4,000.00
2,600.00
300.00
260.00
29,956.51
151,500.00
19,760.00
8,100.00
3,591.54
13,500.00
8,775.00
1,050.00
910.00
207,186.54
120,000.00
19,000.00
8,100.00
3,591.54
31,000.00
22,750.00
2,625.00
1,950.00
209,016.54
25,000.00
3,135.00
540.00
421.23
4,000.00
2,600.00
300.00
260.00
36,256.23
2,600.00
3,000.00
6,800.00
10,400.00
3,500.00
585.00
450.00
162.50
27,497.50
3,900.00
175.00
1,000.00
4,095.00
472.50
162.50
9,805.00
5,250.00
650.00
250.00
175.00
8,000.00
10,400.00
1,200.00
162.50
20,837.50
1,500.00
4,000.00
7,800.00
1,000.00
4,095.00
472.50
162.50
19,030.00
42,600.00
12,425.00
4,050.00
8,775.00
1,012.50
266.50
69,129.00
20,700.00
6,037.50
2,700.00
5,850.00
675.00
175.50
36,138.00
7,920.00
2,310.00
1,800.00
3,900.00
450.00
117.00
16,497.00
48
34 Tegel Anti slip 20 x 20 cm Bh 6,000.00
35 Tegel Plin Keramik 10 x 40 cm Bh 5,000.00
36 Tegel Motif KM/WC (List Dinding) 10 x 20 cm Bh 5,000.00
37 Cat Kilap Kayu (Jenis Avian) Kg 40,000.00
38 Vernis Kayu Standar Ltr 35,000.00
39 Cat Dasar Standar Kg 40,000.00
40 Cat Tembok Metro Lite Kg 30,000.00
41 Lem Kayu Kg 22,000.00
42 Plamur Tembok Kg 15,000.00
43 Plamur Kayu Kg 15,000.00
44 Dempul Kg 13,000.00
45 Meni Kayu Kg 13,000.00
46 Amplas Halus Lbr 9,500.00
47 Amplas Kasar Lbr 2,500.00
48 Pas. Instalasi Listrik Titik 135,000.00
49 Fitting Plafond Bh 23,000.00
50 Fitting dan Lampu Downlight 25 Watt ( Lengkap box) Bh 150,000.00
51 Lampu SL 20 Watt Bh 65,000.00
52 Lampu SL 8 Watt Bh 35,000.00
53 Saklar Ganda Bh 23,000.00
54 Saklar Tunggal Bh 20,000.00
55 Stop Kontak Bh 29,000.00
56 MCB Bh 220,000.00
57 Box MCB Bh 35,000.00
58 Kunci Pintu 2x Putar (Finotti) Bh 250,000.00
59 Engsel Pintu H Kuningan Bh 18,500.00
60 Engsel Jendela Kupu-Kupu Standar Bh 19,700.00
61 Grendel Pintu H Kuningan Bh 30,000.00
62 Grendel Pintu Dua Daun Kuningan Bh 45,000.00
63 Grendel Jendela Kuningan Bh 17,500.00
64 Hak Angin Jendela Standar Psg 9,000.00
65 Pegangan Pintu Stainless Steel Bh 260,000.00
66 Klosed Jongkok Standar Bh 125,000.00
67 Wastafel Bh 300,000.00
68 Kran Kuningan Ø 1/2" Bh 28,000.00
69 Floor Drain Bh 15,000.00
70 Tempat Sabun Tanam Bh 19,000.00
71 List Plafond 4x4 cm M' 20,000.00
72 Kuas Bh 17,500.00
73 Seal Tipe / Isolasi Pipa Bh 6,000.00
74 Bak Fiberglas Bh 375,000.00
75 Minyak Bekisting Ltr 14,000.00
76 Septictank Unit 1,500,000.00
74 Pipa PVC Ø 4 " M' 35,500.00
75 Pipa PVC Ø 2 " M' 17,250.00
76 Pipa PVC Ø 1/2 " M' 6,600.00
Saklar tungga
Wanggudu, April 2012
Disetujui Oleh : Dibuat Oleh,-
PEJABAT PEMBUAT KOMITMEN (PPK) : Konsultan Perencana :
BAGIAN ADMINISTRASI PEMERINTAHAN UMUM CV. TEKNIK CIPTA PARISUDHA
SETDA KAB. KONAWE UTARA
49
NIP. 19780709199810 1 003 Direktur
50
DAFTAR ANALISA
SATUAN KERJA : BAGIAN PEMERINTAHAN BUPATI KONAWE UTARA
PEKERJAAN : REHAB GEDUNG KANTOR CAMAT MOLAWE
LOKASI : KEC. MOLAWE KAB. KONAWE UTARA
TAHUN ANGGARAN : 2012
16 Analisa SNI 1 M2 Pasangan Dinding Batu Merah Ukuran (5 x 11 x 22) cm tebal 1/2 Batu
Campuran Spesi 1 PC : 3 PP
Indeks Satuan Harga Satuan Jumlah Harga (Rp)
Bahan
70.000 Buah Bata Merah Rp 650.00 Rp 45,500.00
14.370 Kg Portland Cement Rp 1,900.00 Rp 27,303.00
0.040 m3 Pasir Pasang Rp 160,000.00 Rp 6,400.00
Sub Total I Rp 79,203.00
Tenaga Kerja
0.300 OH Pekerja Rp 50,000.00 Rp 15,000.00
0.100 OH Tukang Batu Rp 65,000.00 Rp 6,500.00
0.010 OH Kepala Tukang Rp 75,000.00 Rp 750.00
0.015 OH Mandor Rp 65,000.00 Rp 975.00
Sub Total I Rp 23,225.00
Total Rp 102,428.00
17 Analisa SNI 1 M2 Pasangan Dinding Batu Merah Ukuran (5 x 11 x 22) cm tebal 1/2 Batu
Campuran Spesi 1 PC : 5 PP
Indeks Satuan Harga Satuan Jumlah Harga (Rp)
Bahan
70.000 Buah Bata Merah Rp 650.00 Rp 45,500.00
9.680 Kg Portland Cement Rp 1,900.00 Rp 18,392.00
0.045 m3 Pasir Pasang Rp 160,000.00 Rp 7,200.00
Sub Total I Rp 71,092.00
Tenaga Kerja
0.300 OH Pekerja Rp 50,000.00 Rp 15,000.00
0.100 OH Tukang Batu Rp 65,000.00 Rp 6,500.00
0.010 OH Kepala Tukang Rp 75,000.00 Rp 750.00
0.015 OH Mandor Rp 65,000.00 Rp 975.00
Sub Total I Rp 23,225.00
Total Rp 94,317.00
22 Analisa SNI Membuat dan memasang 1M3 Kusen Pintu Jendela, Kayu Klass I
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
1.1000 M3 Balok Kayu Kelas I Rp 4,000,000.00 Rp 4,400,000.00
1.2500 Kg Paku 10 cm Rp 22,000.00 Rp 27,500.00
1.0000 Kg Lem Kayu Rp 22,000.00 Rp 22,000.00
Sub Total I Rp 4,449,500.00
Tenaga Kerja
7.000 OH Pekerja Rp 50,000.00 Rp 350,000.00
21.000 OH Tukang Kayu Rp 65,000.00 Rp 1,365,000.00
2.100 OH Kepala Tukang Rp 75,000.00 Rp 157,500.00
0.250 OH Mandor Rp 65,000.00 Rp 16,250.00
Sub Total I Rp 1,888,750.00
Total Rp 6,338,250.00
23 Analisa SNI Membuat dan memasang 1M2 Daun Pintu Panel,Kayu Klass I atau II
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
0.0400 M3 Papan Kayu Kelas II Rp 2,100,000.00 Rp 84,000.00
0.5000 Kg Lem Kayu Rp 22,000.00 Rp 11,000.00
Sub Total I Rp 95,000.00
Tenaga Kerja
1.000 OH Pekerja Rp 50,000.00 Rp 50,000.00
3.000 OH Tukang Kayu Rp 65,000.00 Rp 195,000.00
0.300 OH Kepala Tukang Rp 75,000.00 Rp 22,500.00
0.050 OH Mandor Rp 65,000.00 Rp 3,250.00
Sub Total I Rp 270,750.00
Total Rp 365,750.00
24 Analisa SNI Membuat dan memasang 1M2 Daun Pintu dan Jendeka Kaca,Kayu Klass I atau II
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
0.0400 M3 Papan Kayu Kelas II Rp 2,100,000.00 Rp 84,000.00
1.1000 M2 Kaca 5 mm Rp - Rp -
0.5000 Kg Lem Kayu Rp 22,000.00 Rp 11,000.00
Sub Total I Rp 95,000.00
Tenaga Kerja
1.000 OH Pekerja Rp 50,000.00 Rp 50,000.00
3.000 OH Tukang Kayu Rp 65,000.00 Rp 195,000.00
0.300 OH Kepala Tukang Rp 75,000.00 Rp 22,500.00
0.050 OH Mandor Rp 65,000.00 Rp 3,250.00
Sub Total I Rp 270,750.00
Total Rp 365,750.00
25 Analisa SNI Membuat dan memasang 1M2 Daun Pintu dan Jendela Jalusi,Kayu Klass I atau II
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
0.0640 M3 Papan Kayu Kelas II Rp 2,100,000.00 Rp 134,400.00
0.5000 Kg Lem Kayu Rp 22,000.00 Rp 11,000.00
Sub Total I Rp 145,400.00
Tenaga Kerja
0.500 OH Pekerja Rp 50,000.00 Rp 25,000.00
3.000 OH Tukang Kayu Rp 65,000.00 Rp 195,000.00
0.300 OH Kepala Tukang Rp 75,000.00 Rp 22,500.00
0.050 OH Mandor Rp 65,000.00 Rp 3,250.00
Sub Total I Rp 245,750.00
Total Rp 391,150.00
26 Analisa SNI Memasang 1M2 Daun Pintu Kayu Lapis (Playwood) Rangkap Rangka Tertutup
Kayu Kls II (Lebar sampai 90 cm)
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
0.0250 M3 Papan Kayu Kelas II Rp 2,100,000.00 Rp 52,500.00
0.0300 M4 Paku 1 cm-2,5 cm Rp 22,000.00 Rp 660.00
0.5000 Kg Lem Kayu Rp 22,000.00 Rp 11,000.00
1.0000 Lbr Plywood Tebal34 mm Rp 65,000.00 Rp 65,000.00
Sub Total I Rp 129,160.00
Tenaga Kerja
0.700 OH Pekerja Rp 50,000.00 Rp 35,000.00
1.000 OH Tukang Kayu Rp 65,000.00 Rp 65,000.00
0.210 OH Kepala Tukang Rp 75,000.00 Rp 15,750.00
0.035 OH Mandor Rp 65,000.00 Rp 2,275.00
Sub Total I Rp 118,025.00
Total Rp 247,185.00
28 Analisa SNI Membuat dan memasang 1M2 Jalusi Kusen, Kayu Klass I atau II
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
0.0600 M3 Papan Kayu Kelas II Rp 2,100,000.00 Rp 126,000.00
0.1500 Kg Lem Kayu Rp 22,000.00 Rp 3,300.00
Sub Total I Rp 129,300.00
Tenaga Kerja
0.670 OH Pekerja Rp 50,000.00 Rp 33,500.00
2.000 OH Tukang Kayu Rp 65,000.00 Rp 130,000.00
0.200 OH Kepala Tukang Rp 75,000.00 Rp 15,000.00
0.335 OH Mandor Rp 65,000.00 Rp 21,775.00
Sub Total I Rp 200,275.00
Total Rp 329,575.00
29 Analisa SNI Memasang 1 m3 konstruksi kuda-kuda Konvensional, kayu kelas I, II dan III
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
1.100 m3 Balok Kayu Rp 2,100,000.00 Rp 2,310,000.00
15.000 Kg Besi strip tebal 5 mm Rp 28,600.00 Rp 429,000.00
5.600 Kg Paku 12 cm Rp 22,000.00 Rp 123,200.00
Sub Total I Rp 2,862,200.00
Tenaga Kerja
4.000 OH Pekerja Rp 50,000.00 Rp 200,000.00
12.000 OH Tukang Kayu Rp 65,000.00 Rp 780,000.00
1.200 OH Kepala Tukang Rp 75,000.00 Rp 90,000.00
0.200 OH Mandor Rp 65,000.00 Rp 13,000.00
Sub Total I Rp 1,083,000.00
Total Rp 3,945,200.00
42 Analisa SNI Memasang 1 m2 tegel keramik anti slip ukuran (20 x 20) cm
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
26.500 Buah Tegel keramik anti slip Rp 5,275.00 Rp 139,787.50
10.400 Kg Portland Cement Rp 1,900.00 Rp 19,760.00
0.045 m3 Pasir Pasang Rp 160,000.00 Rp 7,200.00
1.620 Kg Semen Warna Rp 1,800.00 Rp 2,916.00
Sub Total I Rp 169,663.50
Tenaga Kerja
0.270 OH Pekerja Rp 50,000.00 Rp 13,500.00
0.135 OH Tukang Batu Rp 65,000.00 Rp 8,775.00
0.014 OH Kepala Tukang Rp 75,000.00 Rp 1,050.00
0.014 OH Mandor Rp 65,000.00 Rp 910.00
Sub Total I Rp 24,235.00
Total Rp 193,898.50
46 Analisa SNI Memasang 1 m2 rangka langit-langit Jarak (60 x 120) cm, kayu balok 5/7 kelas II
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
0.016 m3 Kaso-kaso ( 5 x 7 ) cm Rp 2,100,000.00 Rp 33,600.00
0.250 Kg Paku 7 cm dan 10 cm Rp 22,000.00 Rp 5,500.00
Sub Total I Rp 39,100.00
Tenaga Kerja
0.200 OH Pekerja Rp 50,000.00 Rp 10,000.00
0.300 OH Tukang Kayu Rp 65,000.00 Rp 19,500.00
0.030 OH Kepala Tukang Rp 75,000.00 Rp 2,250.00
0.010 OH Mandor Rp 65,000.00 Rp 650.00
Sub Total I Rp 32,400.00
Total Rp 71,500.00
47 Analisa SNI Memasang 1 m2 Plafond Tripleks Ukuran (120 x 240) cm
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
0.375 Lbr Tripleks Rp 65,000.00 Rp 24,375.00
0.030 Kg Paku Tripleks Rp 28,000.00 Rp 840.00
Sub Total I Rp 25,215.00
Tenaga Kerja
0.100 OH Pekerja Rp 50,000.00 Rp 5,000.00
0.100 OH Tukang Kayu Rp 65,000.00 Rp 6,500.00
0.010 OH Kepala Tukang Rp 75,000.00 Rp 750.00
0.005 OH Mandor Rp 65,000.00 Rp 325.00
Sub Total I Rp 12,575.00
Total Rp 37,790.00
55 Analisa SNI Pengecetan 1 m2 Tembok (1 lapis cat dasar, 2 lapis cat penutup)
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
0.100 Bh Plamir Rp 15,000.00 Rp 1,500.00
0.100 Bh Cat dasar Rp 40,000.00 Rp 4,000.00
0.260 Bh Cat penutup 2 kali Rp 30,000.00 Rp 7,800.00
Sub Total I Rp 13,300.00
Tenaga Kerja
0.020 OH Pekerja Rp 50,000.00 Rp 1,000.00
0.063 OH Tukang Cat Rp 65,000.00 Rp 4,095.00
0.006 OH Kepala Tukang Rp 75,000.00 Rp 472.50
0.0025 OH Mandor Rp 65,000.00 Rp 162.50
Sub Total I Rp 5,730.00
Total Rp 19,030.00
56 Analisa SNI Pengecetan 1 m2 bidang kayu (1 lapis meni, 1 lapis cat dasar, 2 lapis cat penutup)
Indeks Satuan Kebutuhan Harga Satuan Jumlah Harga (Rp)
Bahan
0.200 Bh Cat meni kayu Rp 40,000.00 Rp 8,000.00
0.200 Bh Plamir
0.170 Bh Cat dasar Rp 40,000.00 Rp 6,800.00
0.260 Bh Cat penutup 2 kali Rp 40,000.00 Rp 10,400.00
Sub Total I Rp 25,200.00
Tenaga Kerja
0.070 OH Pekerja Rp 50,000.00 Rp 3,500.00
0.009 OH Tukang Cat Rp 65,000.00 Rp 585.00
0.006 OH Kepala Tukang Rp 75,000.00 Rp 450.00
0.0025 OH Mandor Rp 65,000.00 Rp 162.50
Sub Total I Rp 4,697.50
Total Rp 29,897.50
0
Disetujui Oleh : Dibuat Oleh,-
Dibuat Oleh,-
ULP / PEJABAT PENGADAAN