Anda di halaman 1dari 73

BUAT KWITANSI : => INDONESIA

Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :

Terbilang
Terbilang/To say
Terbilang
Terbilang/To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP

UNTUK PEMBAYARAN DOKUMEN PREQULIFICATION

Nominal
Nominal Rp. 534,364.000

Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :

Terbilang
Terbilang/To say
Terbilang
Terbilang/To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP

UNTUK PEMBAYARAN DOKUMEN PREQULIFICATION

Nominal
U$D. 534,364.000
Nominal

Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :

Terbilang
Terbilang/To say
Terbilang
Terbilang/To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP

UNTUK PEMBAYARAN DOKUMEN PREQULIFICATION

Nominal
U$D. 534,364.000
Nominal
No AMOUNTH
001 581,180,000.000
002 #REF!
003 #REF!
004 #REF!
005 #REF!
006 #REF!
007
008
009
ISI KATA > INDONESIA atau FOREIGN

KWITANSI PEMBAYARAN/RECIVING OF PEYMENT


PATAR HUTAJULUK

EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUPIAH

PREQULIFICATION Yang Menerima


PT PLN PIKITRING SULAWESI
Makassar, 18-May-2023

SATTUANG SE.

KWITANSI PEMBAYARAN/RECIVING OF PEYMENT


PATAR HUTAJULUK

EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUPIAH

PREQULIFICATION Yang Menerima


PT PLN PIKITRING SULAWESI
Makassar, 18-May-2023

SATTUANG SE.

KWITANSI PEMBAYARAN/RECIVING OF PEYMENT


PATAR HUTAJULUK

EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUPIAH

PREQULIFICATION Yang Menerima


PT PLN PIKITRING SULAWESI
Makassar, 18-May-2023

SATTUANG SE.
TO SAYED
( Lima Ratus Delapan Puluh Satu Juta Seratus Delapan Puluh Ribu Rupiah )
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
KWITANSI No. 1 ( ( Lima Ratus Delapan Puluh Satu Juta Seratus Delapan Puluh Ribu Rupiah )
581,180,000.000
581180000 0
581180000.000 0 0 0
0 MILYAR

KWITANSI No. 2 ( #REF!


#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR

KWITANSI No. 3 ( #REF!


#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR

KWITANSI No. 4 ( #REF!


#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR
KWITANSI No. 5 ( #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR
KWITANSI No. 6 ( #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR
KWITANSI No. 1 ( #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR
KWITANSI No. 1 ( ( Rupiah )
0.000
0 0
0.000 0 0 0
0 MILYAR
KWITANSI No. 1 ( (
0.000
0 0
eratus Delapan Puluh Ribu Rupiah )
581 5 8 1 Lima Ratus Delapan Puluh Satu Juta
581180000.000 0
5 8 1 Lima Ratus Delapan Puluh
BILLION AND 14 Juta Juta

#REF! ### ### #REF! #REF!


#REF! ### #REF!
#REF! ### ### #REF! #REF! #REF!
BILLION AND #REF! #REF! Juta

#REF! ### ### #REF! #REF!


#REF! ### #REF!
#REF! ### ### #REF! #REF! #REF!
BILLION AND #REF! #REF! Juta

#REF! ### ### #REF! #REF!


#REF! ### #REF!
#REF! ### ### #REF! #REF! #REF!
BILLION AND #REF! #REF! Juta

#REF! ### ### #REF! #REF!


#REF! ### #REF!
#REF! ### ### #REF! #REF! #REF!
BILLION AND #REF! #REF! Juta

#REF! ### ### #REF! #REF!


#REF! ### #REF!
#REF! ### ### #REF! #REF! #REF!
BILLION AND #REF! #REF! Juta

#REF! ### ### #REF! #REF!


#REF! ### #REF!
#REF! ### ### #REF! #REF! #REF!
BILLION AND #REF! #REF! Juta

0.000 0
0 0 0
BILLION AND 0 Juta

0
180 1 8 0 Seratus Delapan Puluh Ribu
180000.000 0
Satu 1 8 0 Seratus Delapan Puluh
MILLION AND 9 Ribu Ribu

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
MILLION AND ### #REF! Ribu

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
MILLION AND ### #REF! Ribu

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
MILLION AND ### #REF! Ribu

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
MILLION AND ### #REF! Ribu

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
MILLION AND ### #REF! Ribu

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
MILLION AND ### #REF! Ribu

0.000 0
0 0 0
MILLION AND 0 Ribu

0
000 0 0 0
000.000 0
0 0 0
THOUSAND AND

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
THOUSAND AND

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
THOUSAND AND

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
THOUSAND AND

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
THOUSAND AND

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
THOUSAND AND

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
THOUSAND AND

0 0
0.000 0
0 0 0
THOUSAND AND

0
000 0 0 0
0
0 0 0
0 0

#REF! ### #REF! ### #REF!


#REF! ###
#REF! ### #REF! ### #REF! #REF! #REF!
#REF! ###

#REF! ### #REF! ### #REF!


#REF! ###
#REF! ### #REF! ### #REF! #REF! #REF!
#REF! ###

#REF! ### #REF! ### #REF!


#REF! ###
#REF! ### #REF! ### #REF! #REF! #REF!
#REF! ###

#REF! ### #REF! ### #REF!


#REF! ###
#REF! ### #REF! ### #REF! #REF! #REF!
#REF! ###

#REF! ### #REF! ### #REF!


#REF! ###
#REF! ### #REF! ### #REF! #REF! #REF!
#REF! ###

#REF! ### #REF! ### #REF!


#REF! ###
#REF! ### #REF! ### #REF! #REF! #REF!
#REF! ###

000 0 0 0
0
0 0 0
0 0

0
SATUAN
ANGKA
1
2
3
4
5
6
7
8
9

PULUHAN
ANGKA
1
2
3
4
5
6
7
8
9

BELASAN
ANGKA
10
11
12
13
14
15
16
17
18
19

Koma KOMMA
Rupiah Rupiah ) DOLAR
RATUSAN
ANGKA
1
2
### Koma KOMMA 3
Rupiah Rupiah ) DOLAR 4
5
6
7
8
### Koma KOMMA 9
Rupiah Rupiah ) DOLAR

### Koma KOMMA


Rupiah Rupiah ) DOLAR

### Koma KOMMA


Rupiah Rupiah ) DOLAR

### Koma KOMMA


Rupiah Rupiah ) DOLAR

### Koma KOMMA


Rupiah Rupiah ) DOLAR

Koma KOMMA
Rupiah Rupiah ) DOLAR
Satu Satu ONE
Dua Dua TWO
Tiga Tiga THREE
Empat Empat FOUR
Lima Lima FIVE
Enam Enam SIX
Tujuh Tujuh SEVEN
Delapan Delapan EIGHT
Sembilan Sembilan NINE

Sepuluh Sepuluh TEN


Dua Puluh Dua Puluh TWENTY
Tiga Puluh Tiga Puluh THIRTY
Empat Puluh Empat Puluh FOURTY
Lima Puluh Lima Puluh FIVETY
Enam Puluh Enam Puluh SIXTY
Tujuh Puluh Tujuh Puluh SEVENTY
Delapan Puluh Delapan Puluh EIGHTY
Sembilan Puluh Sembilan Puluh NINETY

Sepuluh Sepuluh TEN


Sebelas Sebelas ELEVEN
Dua Belas Dua Belas TWELVE
Tiga Belas Tiga Belas THIRTEEN
Empat Belas Empat Belas FOURTEEN
Lima Belas Lima Belas FIVETEEN
Enam Belas Enam Belas SIXTEEN
Tujuh Belas Tujuh Belas SEVENTEEN
Delapan Belas Delapan Belas EIGHTEEN
Sembilan Belas Sembilan Belas NINETEEN

Seratus Seratus HUNDRED AND


Dua Ratus Dua Ratus TWO HUNDRED AND
Tiga Ratus Tiga Ratus THREE HUNDRED AND
Empat Ratus Empat Ratus FOUR HUNDRED AND
Lima Ratus Lima Ratus FIVE HUNDRED AND
Enam Ratus Enam Ratus SIX HUNDRED AND
Tujuh Ratus Tujuh Ratus SEVEN HUNDRED AND
Delapan Ratus Delapan Ratus EIGHT HUNDRED AND
Sembilan Ratus Sembilan Ratus NINE HUNDRED AND
REKAPITULASI TOTAL
### : PEMBANGUNAN JALAN SETAPAK DAN MCK
### #REF!

NO. URAIAN PEKERJAAN HARGA PEKERJAAN

### PEMBANGUNAN JALAN SETAPAK Rp 581,180,000.00

B PEMBANGUNAN MCK #REF!

TOTAL COST #REF!

DIBULATKAN #REF!

TERBILANG : #REF!

Andoolo, Februari 2019

KEPALA DINAS PARIWISATA KAB. KONAWE SELATAN


REKAPITULASI
PEKERJAAN : PEMBANGUNAN TOILET DAN RUANG GANTI
LOKASI : AIR TERJUN MORAMO, DESA SUMBER SARI, KEC. MORAMO, KAB. KONSEL
TAHUN ANGGARAN : 2019

NO. URAIAN PEKERJAAN HARGA PEKERJAAN

A PEKERJAAN PENDAHULUAN / PERSIAPAN Rp 25,392,000.00

B PEKERJAAN TANAH DAN PASIR Rp 1,593,835.65

C PEKERJAAN PASANGAN PONDASI BATU GUNUNG Rp 11,198,201.48

D PEKERJAAN BETON #REF!

E PEKERJAAN PENUTUP LANTAI DAN DINDING KERAMIK #REF!

F PEKERJAAN DINDING DAN PLESTERAN Rp 8,050,488.42

G PEKERJAAAN INSTALASI LISTRIK Rp 6,314,196.00

H PEKERJAAN SANITASI Rp 29,330,259.26

I PEKERJAAN FINISHING DAN LAIN-LAIN Rp 6,997,025.06

REAL COST #REF!

PPN 10% #REF!

TOTAL COST #REF!

DIBULATKAN #REF!

TERBILANG : #REF!

Andoolo, Maret 2019

MENGETAHUI/MENYETUJUI : DIBUAT OLEH :


DINAS PARIWISATA KAB. KONAWE SELATAN KONSULTAN PERENCANA
KEPALA BIDANG PARIWISATA CV. MITRA MANDIRI
SELAKU PEJABAT PEMBUAT KOMITMEN (PPK) CONSULTANT

MUH. ASWAN YASIN, SE., M.Si AHMAD MAHMUD


NIP. 19771011 200701 1 015
Direktur
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN TOILET DAN RUANG GANTI
LOKASI : AIR TERJUN MORAMO, DESA SUMBER SARI, KEC. MORAMO, KAB. KONSEL
TAHUN ANGGARAN : 2019

NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

a b c d e f
A PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pembuatan bangsal dan barak kerja Ls 1.00 2,500,000.00 2,500,000.00
2 Pembuatan papan nama proyek Ls 1.00 150,000.00 150,000.00
3 Pengukuran dan pemasangan bouwplank M1 24.00 84,562.50 2,029,500.00
4 Penyediaan air kerja Ls 1.00 300,000.00 300,000.00
5 Penyediaan P3K Ls 1.00 100,000.00 100,000.00
6 Biaya Pemindahan gazebo dari titik lokasi Ls 1.00 1,750,000.00 1,750,000.00
7 Biaya Angkut material besi dari gerbang ke Lokasi Ls 1.00 1,750,000.00 1,750,000.00
8 Biaya Angkut material pasir, suplit, batu dan bata dari gerbang ke Lokasi Ls 1.00 1,750,000.00 1,750,000.00
9 Biaya Angkut material sanitair dari gerbang ke titik lokasi Ls 1.00 1,750,000.00 1,750,000.00
10 Biaya Angkut material semen dari gerbang ke Lokasi zak 110.00 93,750.00 10,312,500.00
11 Adminstrasi dan pelaporan Ls 1.00 3,000,000.00 3,000,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) 25,392,000.00
B PEKERJAAN TANAH DAN PASIR
1 Pek. Galian pondasi M3 13.44 47,272.50 635,342.40
2 Pek. Urugan tanah bekas galian (1/4 dari total galian) M3 3.36 52,525.00 176,484.00
3 Pek. Urugan tanah bawah lantai (didatangkan dan dipadatkan) M3 1.92 168,025.00 322,608.00
3 Pek. Urugan pasir bawah lantai tebal 5 cm M3 1.20 177,375.00 212,850.00
4 Pek. Urugan pasir bawah pondasi t = 5 cm M3 0.84 177,375.00 148,995.00
5 Pek. Urugan pasir bawah pondasi dan rabat beton keliling t = 5 cm M3 0.55 177,375.00 97,556.25
Sub Total (Dipindahkan Ke Rekapitulasi) 1,593,835.65
C PEKERJAAN PASANGAN PONDASI BETON
1 Pasangan batu kosong uk. 5-7 cm M3 2.77 776,838.98 2,153,397.64
2 Pasangan Pondasi beton batu 5-7 cm, Camp. 1 : 2 : 3 M3 6.43 1,407,532.50 9,044,803.85
Sub Total (Dipindahkan Ke Rekapitulasi) 11,198,201.48
D PEKERJAAN BETON
1 PEKERJAAN SLOEF BETON
a. Pek. Bekisting M2 9.60 159,819.00 1,534,262.40
b. Pek. Pembesian Kg #REF! 28,092.90 #REF!
c. Pek. Sloef beton (S) Ukuran ; 15x20 cm M3 0.72 1,595,699.88 1,148,903.91
2 PEKERJAAN KOLOM
a. Pek. Bekisting M2 12.00 381,502.00 4,578,024.00
b. Pek. Pembesian Kg 105.85 28,092.90 2,973,682.63
c. Pek. Kolom beton (K) Ukuran ; 20x20 cm M3 0.60 1,595,699.88 957,419.93
3 PEKERJAAN RINGBALOK
a. Pek. Bekisting M2 9.60 381,502.00 3,662,419.20
b. Pek. Pembesian Kg #REF! 28,092.90 #REF!
c. Pek. Ring balok (S1) ukuran ; 15x20 cm M3 0.72 1,595,699.88 1,148,903.91
4 PEKERJAAN DAK/PLAT BETON
a. Pek. Bekisting M2 37.00 421,102.00 15,580,774.00
b. Pek. Pembesian Kg 404.16 28,092.90 11,354,138.84
c. Pek. Dak beton 1 : 2 : 3, tebal 10 cm M3 3.85 1,595,699.88 6,143,444.52
5 PEKERJAAN RABAT BETON
a. Pek. Rabat beton bawah lantai 1 : 3 : 5 M3 1.32 1,370,308.91 1,808,807.76
b. Pek. Rabat beton Keliling 1 : 3 : 5 M3 0.73 1,370,308.91 994,844.27
Sub Total (Dipindahkan Ke Rekapitulasi) #REF!
E PEKERJAAN PENUTUP LANTAI DAN DINDING KERAMIK
2 Pas. Lantai Keramik anti slip, 25x25 cm M2 26.40 Rp 244,274.25 Rp 6,448,840.20
3 Pas. Dinding keramik toilet, 25x40 cm M2 72.96 #REF! #REF!
5 Pas. Tegel keramik kuku M1 5.28 Rp 15,000.00 Rp 79,200.00
Sub Total (Dipindahkan Ke Rekapitulasi) #REF!
F PEKERJAAN DINDING DAN PLESTERAN
1 Pek. Pasangan dinding bata, 1Pc : 5Psr M2 18.20 Rp 132,838.75 Rp 2,417,665.25
2 Pek. Pasangan dinding bata 1Pc : 2Psr M2 8.32 Rp 148,039.38 Rp 1,231,095.44
4 Pek. Plesteran dinding, 1Pc : 5Psr M2 36.40 Rp 66,140.25 Rp 2,407,505.10
5 Pek. Plesteran dinding 1Pc : 2Psr M2 16.63 Rp 75,372.00 Rp 1,253,587.10
6 Pek. Plesteran Kolom beton 1Pc : 2Psr M2 8.16 Rp 75,372.00 Rp 615,035.52
7 Pas. Loster 15x20 Bh 16.00 Rp 7,850.00 Rp 125,600.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 8,050,488.42
G PEKERJAAAN INSTALASI LISTRIK
1 Meteran KWH 1200 watt Bh 1.00 Rp 3,000,000.00 Rp 3,000,000.00
2 Instalasi Lampu Titik 10.00 Rp 250,000.00 Rp 2,500,000.00
3 MCB 1P 6 A Ex. Broco Bh 1.00 Rp 42,500.00 Rp 42,500.00
4 Box MCB 6 A, Ex. Broco Bh 1.00 Rp 8,000.00 Rp 8,000.00
5 Saklar ganda Bh 5.00 Rp 34,000.00 Rp 170,000.00
6 Kabel NYA 2,5 mm, Ex. Eterna M1 36.00 Rp 5,811.00 Rp 209,196.00
7 Pipa listrik 5/8 inchi, Ex Clipsal Btg 2.00 Rp 9,000.00 Rp 18,000.00
8 Inbow Dos Bh 4.00 Rp 2,000.00 Rp 8,000.00
9 Isolasi Listrik, Ex. Unibell Roll 1.00 Rp 7,500.00 Rp 7,500.00
10 Isolator + paku Bh 30.00 Rp 700.00 Rp 21,000.00
11 Fitting lampu putih, Ex. Broco Bh 10.00 Rp 6,000.00 Rp 60,000.00
12 Lampu LED 5 watt Bh 10.00 Rp 27,000.00 Rp 270,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 6,314,196.00
H PEKERJAAN SANITASI
1 Pek. pipa PVC 1/2 '' PVC untuk air bersih M1 148.00 Rp 20,805.81 Rp 3,079,260.25
2 Pek. pipa PVC 2 " PVC untuk air kotor M1 8.00 Rp 61,540.88 Rp 492,327.00
3 Pek. pipa PVC 4 '' PVC untuk limbah padat M1 36.00 Rp 134,536.19 Rp 4,843,302.75
5 Pas. Kran air 1/2 " Bh 8.00 Rp 97,291.56 Rp 778,332.50
6 Pas. Kloset jongkok Set 8.00 Rp 715,192.50 Rp 5,721,540.00
7 Pas. Floor drain (FD) Bh 8.00 Rp 53,597.50 Rp 428,780.00
8 Pek. Septictank dan peresapan Unit 1.00 Rp 5,986,716.76 Rp 5,986,716.76
9 Pek. Pasangan pintu Aluminium KM/WC Unit 8.00 Rp 350,000.00 Rp 2,800,000.00
10 Pengadaan Mesin air PS-226 bit ex. Simizhu Unit 1.00 Rp 1,200,000.00 Rp 1,200,000.00
11 Pengadaan Tandon air Kap. 1200 L Unit 2.00 Rp 2,000,000.00 Rp 4,000,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 29,330,259.26
I PEKERJAAN FINISHING DAN LAIN-LAIN
1 Pekerjaan Pengecatan
a. Cat dinding tembok dan kolom M2 92.20 Rp 48,766.30 Rp 4,496,252.86
b. Cat dak beton Weathershield, Anti lumut M2 44.00 Rp 50,017.55 Rp 2,200,772.20
2 Pekerjaan Pembersihan akhir Ls 1.00 Rp 300,000.00 Rp 300,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 6,997,025.06
REKAPITULASI

PEKERJAAN : PEMBANGUNAN JALAN SETAPAK KAWASAN TRACK WISATA ALAM


LOKASI : AIR TERJUN, DESA SUMBER SARI, KEC. MORAMO, KAB. KONAWE SELATAN
TAHUN ANGGARAN : 2019

NO. URAIAN PEKERJAAN HARGA PEKERJAAN

I PEKERJAAN PENDAHULUAN Rp. 17,700,000.00


II PEKERJAAN JEMBATAN GANTUNG (BENTANG 26 M) Rp. 195,402,057.74
III PEKERJAAN JEMBATAN 1 (BENTANG 12,3 M) Rp. 62,705,297.10
IV PEKERJAAN JEMBATAN 2 (BENTANG 9 M) Rp. 70,533,220.17
V PEKERJAAN JALAN SETAPAK Rp. 182,012,140.76

VI REAL COST Rp. 528,352,715.77


VII PPN 10 % x VI Rp. 52,835,271.58
VIII TOTAL COST Rp. 581,187,987.35
IX DIBULATKAN Rp. 581,180,000.00

Terbilang : ( Lima Ratus Delapan Puluh Satu Juta Seratus Delapan Puluh Ribu Rupiah )

Andoolo, Maret 2019

MENGETAHUI/MENYETUJUI : DIBUAT OLEH :


DINAS PARIWISATA KAB. KONAWE SELATAN KONSULTAN PERENCANA
KEPALA BIDANG PARIWISATA CV. MITRA MANDIRI
SELAKU PEJABAT PEMBUAT KOMITMEN (PPK) CONSULTANT

MUH.
NIP. ASWAN YASIN,
19771011 SE.,
200701 M.Si
1 015 AHMAD MAHMUD
Direktur
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN JALAN SETAPAK KAWASAN TRACK WISATA ALAM


LOKASI : AIR TERJUN, DESA SUMBER SARI, KEC. MORAMO, KAB. KONAWE SELATAN
TAHUN ANGGARAN : 2019

URAIAN PEKERJAAN SAT VOL HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

1 2 4 3 5 6
A PEKERJAAN PENDAHULUAN
1 Pembuatan bangsal dan barak kerja Ls 1.00 5,000,000.00 5,000,000.00
2 Pengukuran dan pemasangan bouwplank Ls 1.00 4,000,000.00 4,000,000.00
3 Pembuatan papan nama proyek Ls 1.00 200,000.00 200,000.00
4 Penyediaan air kerja Ls 1.00 1,500,000.00 1,500,000.00
5 Penyediaan P3K Ls 1.00 500,000.00 500,000.00
6 Biaya Angkut material untuk bouvlank dan bekisting Ls 1.00 1,500,000.00 1,500,000.00
7 Administrasi dan pelaporan Ls 1.00 5,000,000.00 5,000,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) 17,700,000.00
II PEKERJAAN JEMBATAN GANTUNG (BENTANG 26 M)
A. PEKERJAAN PERSIAPAN, PEMBONGKARAN DAN PERBAIKAN
1 Pek. pembongkaran lantai papan kayu eksisting M2 51.48 36,767.50 1,892,790.90
2 Pek. Pembongkaran besi gantung, besi sling dan mur baut Ls 1.00 2,000,000.00 2,000,000.00
3 Pek. Las Perbaikan Railing Pipa besi Ø 2" dan besi Ø 1" titik 60.00 68,365.00 4,101,900.00
4 Biaya angkut material besi dari gerbang ke lokasi Ls 1.00 1,500,000.00 1,500,000.00
5 Pembersihan Baja dan Besi Eksisting Ls 1.00 1,000,000.00 1,000,000.00
6 Sewa Pemasangan perancah / Scaffolding main frame 1,7 m hr 60.00 568,000.00 34,080,000.00
posisi di bawah jembatan gantung
B PEKERJAAN BESI
1 Pek. Pas. Besi gantung vertikal Ø 16" pasang baru Kg 104.70 102,646.50 10,746,792.93
2 Pas. Baut sambungan baja Ø 14 mm Bh 112.00 15,000.00 1,680,000.00
3 Pek. Lantai Plat besi t. 2 mm + rangka Besi siku L 30.30.3 M2 51.48 1,689,198.50 86,959,938.78
4 Pek. Las plat lantai besi pasang baru Titik 367.00 68,365.00 25,089,955.00
5 Pas. Mur Baut lantai plat besi Bh 416.00 10,000.00 4,160,000.00
6 Pas. Sling besi Ø 10 mm M1 71.50 50,000.00 3,575,000.00
7 Pas. Turnbuckle Ø 10 mm Bh 52.00 9,000.00 468,000.00
8 Pek. Pas. Railing besi baru Ø 2" & 1,5" M2 2.10 422,600.19 887,460.40
C PEKERJAAN FINISHING
1 Pek. Cat semprot besi baja eksisting M2 40.91 80,762.00 3,303,973.42
2 Pek. Cat Semprot Railing pipa besi eksisting M2 64.65 80,762.00 5,221,263.30
3 Pek. Cat Besi rangka lantai plat besi, hollow 4x4 cm M2 32.38 80,762.00 2,615,396.61
4 Pek. Cat lantai Plat besi M2 57.20 80,762.00 4,619,586.40

D PEKERJAAN LAIN-LAIN
1 Pekerjaan Pembersihan sisa-sisa material Ls 1.00 1,500,000.00 1,500,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) 195,402,057.74
III PEKERJAAN JEMBATAN 1 (BENTANG 12,3 M)

A. PEKERJAAN PERSIAPAN DAN PEMBONGKARAN


1 Pek. pembongkaran lantai papan dan railing kayu lama M2 24.60 36,767.50 904,480.50
2 Pek. Pembongkaran abutment lama M3 2.60 661,826.00 1,720,747.60
3 Biaya Angkut material besi dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
4 Biaya Angkut material batu dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
5 Biaya Angkut material Pasir dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
6 Biaya Angkut material Suplit dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
7 Biaya Angkut material semen dari gerbang ke titik lokasi zak 56.00 93,750.00 5,250,000.00

B PEKERJAAN REHABILITASI ABUTMENT LAMA


1 Pek. Pas. Batu gunung, camp. 1PC : 3 Psr M3 0.80 1,130,456.25 904,365.00
2 Pek. Plesteran camp. 1PC : 2 Psr M2 3.65 75,372.00 274,957.06
3 Pek. Acian semen M2 1.79 40,143.13 71,936.48

C PEKERJAAN ABUTMENT BARU


1 Pek. Batu kosong uk. 10 cm M3 0.80 776,838.98 621,471.18
2 Pek. Pondasi beton, camp. 1PC : 2 Psr : 3 Krkl M3 3.72 1,407,532.50 5,236,020.90
3 Pek. Plesteran camp. 1PC : 2 Psr M2 10.92 75,372.00 823,062.24
4 Pek. Acian semen M2 10.92 40,143.13 438,362.93

D PEKERJAAN BETON
1 Pek. Beton alas gelagar baja
a. Pek. Bekisting M2 1.15 381,502.00 439,490.30
b. Pek. Pembesian Kg 30.41 28,092.90 854,181.48
c. Pek. Balok beton 40/30 cm, beton mutu K-250 M3 0.48 1,595,699.88 765,935.94

2 Pek. Lantai Plat beton. T. 10 cm


a. Pek. Bekisting M2 28.89 421,102.00 12,165,636.78
b. Pek. Pembesian Kg 443.52 28,092.90 12,459,709.91
c. Pek. Plat beton t. 10 cm, beton mutu K-250 M3 3.25 1,595,699.88 5,181,556.63

3 Pek. Plesteran Lantai plat beton, Camp. 1 PC : 2 Psr M2 19.68 75,372.00 1,483,320.96

E PEKERJAAN LANTAI
1 Pek. Tegel Keramik 40 x 40 cm anti slip M2 27.06 244,274.25 6,610,061.21

F PEKERJAAN LAIN-LAIN
1 Pekerjaan Pembersihan sisa-sisa material Ls 1.00 500,000.00 500,000.00

Sub Total (Dipindahkan Ke Rekapitulasi) 62,705,297.10


IV PEKERJAAN JEMBATAN 2 (BENTANG 9 M)
A. PEKERJAAN PERSIAPAN DAN PEMBONGKARAN
1 Pek. Pembongkaran abutment lama M3 1.60 661,826.00 1,058,921.60
2 Biaya Angkut material Pasir dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
3 Biaya angkut material Batu dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
4 Biaya angkut material Suplit dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
4 Biaya Angkut material Besi dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
5 Biaya Angkut material semen dari gerbang ke titik lokasi zak 37.00 93,750.00 3,468,750.00

B PEKERJAAN REHABILITASI ABUTMENT LAMA


1 Pek. Pas. Batu gunung, camp. 1PC : 3 Psr M3 0.32 1,407,532.50 450,410.40
2 Pek. Plesteran camp. 1PC : 2 Psr M2 1.79 148,039.38 265,286.56
3 Pek. Acian semen M2 1.79 40,143.13 71,936.48

C PEKERJAAN ABUTMENT BARU


1 Pek. Batu kosong M3 0.40 776,838.98 310,735.59
2 Pek. Pas. Batu gunung, camp. 1PC : 3 Psr M3 1.56 1,407,532.50 2,195,750.70
3 Pek. Plesteran camp. 1PC : 2 Psr M2 4.16 148,039.38 615,843.80
4 Pek. Acian semen M2 4.16 40,143.13 166,995.40

D PEKERJAAN BETON
1 Pek. Beton alas gelagar baja
a. Pek. Bekisting M2 0.58 381,502.00 219,745.15
b. Pek. Pembesian Kg 15.20 28,092.90 427,090.74
c. Pek. Balok beton 40/30 cm, camp. 1 : 2 : 3 M3 0.24 1,595,699.88 382,967.97

2 Pek. Lantai Plat beton. T. 10 cm


a. Pek. Bekisting M2 21.30 1,595,699.88 33,988,407.34
b. Pek. Pembesian Kg 325.22 28,092.90 9,136,392.60
c. Pek. Plat beton t. 10 cm, beton mutu K-250 M3 2.38 1,595,699.88 3,791,382.90

E PEKERJAAN LANTAI
1 Pek. Rabat alas lantai 1 : 2 : 3 M3 0.34 1,407,532.50 479,968.58
2 Pek. Tegel Keramik 40 x 40 cm anti slip M2 28.67 244,274.25 7,002,634.35

F PEKERJAAN LAIN-LAIN
1 Pekerjaan Pembersihan sisa-sisa material Ls 1.00 500,000.00 500,000.00

Sub Total (Dipindahkan Ke Rekapitulasi) 70,533,220.17


V PEKERJAAN JALAN SETAPAK

A. PEKERJAAN PERSIAPAN
1 Pek. Pembersihan dan perataan Lokasi Ls 1.00 500,000.00 500,000.00
2 Pek. Pembongkaran akar dan pohon Ls 1.00 300,000.00 300,000.00
3 Pengukuran dan pemasangan bouvlank M1 69.10 84,562.50 5,843,268.75
4 Biaya Angkut material pasir dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
5 Biaya angkut material suplit dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
6 Biaya angkut material sirtu dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
7 Biaya angkut material besi dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
8 Biaya angkut keramik dari gerbang ke titik lokasi Ls 1.00 1,500,000.00 1,500,000.00
9 Biaya material semen dari gerbang ke titik lokasi zak 143.00 93,750.00 13,406,250.00
B. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi M3 18.87 47,272.50 892,120.71
2 Pek. Urugan Tanah M3 29.13 168,025.00 4,894,971.51
3 Pek. Timbunan bawah lantai dipadatkan M3 26.40 168,025.00 4,435,860.00
4 Pek. Lapisan sirtu M3 8.20 689,205.00 5,649,551.23

C PEKERJAAN PASANGAN BATU


1 Pek. Pasangan batu kosong bawah lantai M3 18.13 546,757.20 9,911,614.52
2 Pek. Pasangan pondasi batu 1 : 3 : 5 M3 5.44 1,370,308.91 7,452,287.99

D PEKERJAAN BETON
1 Pek. Pondasi beton, camp. 1 : 2 : 3 M3 2.73 1,407,532.50 3,845,941.80
2 Pek. Beton jalan penyeberangan kali camp. 1 : 2 : 3 M3 1.84 1,407,532.50 2,586,256.52
3 Pek. Beton alas Tangga camp. 1 : 2 : 3 M3 13.75 1,407,532.50 19,359,765.02
4 Pek. Rabat beton alas lantai camp. 1 : 2 : 3 M3 0.72 1,407,532.50 1,013,423.40
5 Pek. Lantai kerja alas jalan kali, camp. 1 : 3 : 5 M3 0.62 1,370,308.91 844,110.29
E PEKERJAAN LANTAI
1 Pek. Tegel Keramik 40 x 40 cm anti slip M2 166.74 244,274.25 40,730,874.70

F PEKERJAAN RAILING
1 Pek. Pipa Railing staenless steel Ø1" dan Ø2" M2 107.00 412,980.98 44,188,964.33
2 Pek. Pengelasan Railing dan tiang Pipa staenless steel titik 112.00 68,365.00 7,656,880.00

G PEKERJAAN LAIN-LAIN
1 Pekerjaan Pembersihan sisa-sisa material Ls 1.00 1,000,000.00 1,000,000.00

Sub Total (Dipindahkan Ke Rekapitulasi) 182,012,140.76


REKAP ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN JALAN SETAPAK KAWASAN TRACK WISATA ALAM


LOKASI : AIR TERJUN, DESA SUMBER SARI, KEC. MORAMO, KAB. KONAWE SELATAN
TAHUN ANGGARAN : 2019

A PEKERJAAN PENDAHULUAN/PERSIAPAN
1 m' Pengukuran dan pemasangan bowplank Rp. 84,562.50
1 m3 Pembongkaran beton
1 m3 Pembongkaran pasangan batu gunung lama
1 m2 Pembongkaran kayu

B PEKERJAAN TANAH DAN PASIR


1M3 Galian tanah biasa Rp. 42,975.00
1 m3 Urugan kembali Rp. 47,750.00
1 m3 Urugan Pasir Rp. 161,250.00
1 m3 Urugan tanah lantai/pemadatan tanah (didatangkan) Rp. 152,750.00

C PEKERJAAN PASANGAN PONDASI BATU GUNUNG


1 m3 Pasang pondasi batu gunung Ex. Moramo 1 Pc : 5 Ps Rp. 915,000.00
1 m3 Pasang pondasi batu kosong Rp. 497,052.00

D PEKERJAAN BETON DAN RABAT


1 M3 Membuat rabat beton dan lantai kerja,1 Pc: 3 Ps: 5 Kr Rp. 1,085,735.38
1M2 Pasangan bekesting untuk sloof Rp. 145,290.00
1M2 Pasangan bekesting untuk kolom Rp. 320,570.00
1M2 Pasangan bekesting untuk Ringbalk Rp. 320,570.00
1M3 Membuat beton mutu, f'c=21,7 Mpa (K250) kedap air, slump (12±2) cm, w/c=0,56 Rp. 1,278,636.25
1 Kg Pembesian dengan Besi Polos U-24 Rp. 25,539.00

E PEKERJAAN PENUTUP LANTAI DAN DINDING KERAMIK


1 M2 Pasang Lantai Keramik 40 x 40 cm Rp. 192,367.50

F PEKERJAAN PLESTERAN
1 m2 Plasteran 1 Pc : 2 Ps, tebal 15mm Rp. 68,520.00

G PEKERJAAN RANGKA KAP DAN PENUTUP ATAP


1 M2 Pek. Konstruksi Rangka Atap Baja Ringan Zincalume Rp. 130,265.00
1 m2 Pasangan Atap Spandek warna Rp. 95,540.00
1M1 Pasang atap nok atap Rp. 70,640.00
1M1 Pasang Lisplank Rp. 44,700.00
1M1 Pasang Papan 2/10 cm Rp. 155,925.00

H PEKERJAAAN BESI
1 M1 Pintu besi hollow Rp. 707,073.00
1 M2 Railing Besi Rp. 494,683.63

I PEKERJAAN FINISHING
1 m2 pengecatan bidang kayu baru Rp. 47,705.00
1 m2 pengecatan Kolom Rp. 44,333.00
1 m2 pengecatan bidang besi Rp. 73,420.00

Andoolo, Maret 2019

DIBUAT OLEH :
KONSULTAN PERENCANA
CV. MITRA MANDIRI
CONSULTANT
AHMAD MAHMUD
Direktur
ANALISA HARGA SATUAN

PEKERJAAN : PEMBANGUNAN JALAN SETAPAK KAWASAN TRACK WISATA ALAM


LOKASI : AIR TERJUN, DESA SUMBER SARI, KEC. MORAMO, KAB. KONAWE SELATAN
TAHUN ANGGARAN : 2019

A. PEKERJAAN PENDAHULUAN/PERSIAPAN

1 1 m' Pengukuran dan pemasangan bowplank


BAHAN
0.0420 M3 Kayu Kelas IV @ Rp 1,300,000.00 Rp 54,600.00
0.0400 Kg Paku biasa 2"-5" @ Rp 22,500.00 Rp 900.00
TENAGA
0.1000 Oh Tukang Kayu @ Rp 110,500.00 Rp 11,050.00
0.1000 Oh Pekerja @ Rp 85,000.00 Rp 8,500.00
0.0100 Oh Kepala tukang @ Rp 130,000.00 Rp 1,300.00
0.0050 Oh Mandor @ Rp 105,000.00 Rp 525.00
Sub Total Rp 76,875.00
Overhead + Profit 10 % Rp 7,687.50
Total Rp 84,562.50
2 1 m3 Pembongkaran pasangan batu gunung lama
TENAGA
6.6670 Oh Pekerja @ Rp 85,000.00 Rp 566,695.00
0.3330 Oh Mandor @ Rp 105,000.00 Rp 34,965.00
Sub Total Rp 601,660.00
Overhead + Profit 10 % Rp 60,166.00
Total Rp 661,826.00
3 1 m2 Pembongkaran kayu
TENAGA
0.3500 Oh Pekerja @ Rp 85,000.00 Rp 29,750.00
0.0350 Oh Mandor @ Rp 105,000.00 Rp 3,675.00
Sub Total Rp 33,425.00
Overhead + Profit 10 % Rp 3,342.50
Total Rp 36,767.50

4 1 unit pekerjaan perancah scaffolding


BAHAN
1.0000 unit Main frame T170. cross base 220, Join pine @ #REF! #REF!
0.3000 Kg Leader frame T20, cross base 204, Join pine @ #REF! #REF!
TENAGA
2.0000 Oh Tukang Kayu @ Rp 110,500.00 Rp 221,000.00
1.0000 Oh Pekerja @ Rp 85,000.00 Rp 85,000.00
0.2000 Oh Kepala tukang @ Rp 130,000.00 Rp 26,000.00
0.0500 Oh Mandor @ Rp 105,000.00 Rp 5,250.00
Sub Total #REF!
Overhead + Profit 10 % #REF!
Total #REF!
B. PEKERJAAN TANAH DAN PASIR

1 1M3 Galian tanah biasa


TENAGA
0.4500 Oh Pekerja @ Rp 85,000.00 Rp 38,250.00
0.0450 Oh Mandor @ Rp 105,000.00 Rp 4,725.00
Sub Total Rp 42,975.00
Overhead + Profit 10 % Rp 4,297.50
Total Rp 47,272.50

2 1 m3 Urugan kembali
TENAGA
0.5000 Oh Pekerja @ Rp 85,000.00 Rp 42,500.00
0.0500 Oh Mandor @ Rp 105,000.00 Rp 5,250.00
Sub Total Rp 47,750.00
Overhead + Profit 10 % Rp 4,775.00
Total Rp 52,525.00

3 1 m3 Urugan Pasir
BAHAN
1.2000 M3 Pasir urug @ Rp 112,250.00 Rp 134,700.00
TENAGA
0.3000 Oh Pekerja @ Rp 85,000.00 Rp 25,500.00
0.0100 Oh Mandor @ Rp 105,000.00 Rp 1,050.00
Sub Total Rp 161,250.00
Overhead + Profit 10 % Rp 16,125.00
Total Rp 177,375.00

4 1 m3 Urugan tanah / pemadatan tanah


BAHAN
1.2000 M3 Tanah urug @ Rp 87,500.00 Rp 105,000.00
TENAGA
0.5000 Oh Pekerja @ Rp 85,000.00 Rp 42,500.00
0.0500 Oh Mandor @ Rp 105,000.00 Rp 5,250.00
Sub Total Rp 152,750.00
Overhead + Profit 10 % Rp 15,275.00
Total Rp 168,025.00

5 1 m3 Urugan Kerikil / Suplit 2-3 cm


BAHAN
1.2000 M3 Pasir urug @ Rp 500,000.00 Rp 600,000.00
TENAGA
0.3000 Oh Pekerja @ Rp 85,000.00 Rp 25,500.00
0.0100 Oh Mandor @ Rp 105,000.00 Rp 1,050.00
Sub Total Rp 626,550.00
Overhead + Profit 10 % Rp 62,655.00
Total Rp 689,205.00

6 1 m3 Urugan Sirtu
BAHAN
1.2000 M3 Sirtu @ Rp 198,500.00 Rp 238,200.00
TENAGA
0.3000 Oh Pekerja @ Rp 85,000.00 Rp 25,500.00
0.0100 Oh Mandor @ Rp 105,000.00 Rp 1,050.00
Sub Total Rp 264,750.00
Overhead + Profit 10 % Rp 26,475.00
Total Rp 291,225.00
C. PEKERJAAN PASANGAN PONDASI BATU GUNUNG

1 1 m3 Pasang pondasi batu kosong


BAHAN
1.2000 M3 Batu gunung Ex.Moramo @ Rp 275,000.00 Rp 330,000.00
0.4320 M3 Pasir urug @ Rp 112,250.00 Rp 48,492.00
TENAGA
0.3900 Oh Tukang Batu @ Rp 110,500.00 Rp 43,095.00
0.7800 Oh Pekerja @ Rp 85,000.00 Rp 66,300.00
0.0390 Oh Kepala tukang @ Rp 130,000.00 Rp 5,070.00
0.0390 Oh Mandor @ Rp 105,000.00 Rp 4,095.00
Sub Total Rp 497,052.00
Overhead + Profit 10 % Rp 49,705.20
Total Rp 546,757.20

2 1 m3 Pasang batu kosong suplit uk. 5 - 7 cm


BAHAN
1.2000 M3 Batu gunung uk. 5-7 cm, Ex.Moramo @ Rp 500,000.00 Rp 600,000.00
0.4320 M3 Pasir urug @ Rp 198,500.00 Rp 85,752.00
TENAGA
0.3900 Oh Tukang Batu @ Rp 7,850.00 Rp 3,061.50
0.7800 Oh Pekerja @ Rp 1,875.00 Rp 1,462.50
0.0390 Oh Kepala tukang @ Rp 221,250.00 Rp 8,628.75
0.0390 Oh Mandor @ Rp 187,500.00 Rp 7,312.50
Sub Total Rp 706,217.25
Overhead + Profit 10 % Rp 70,621.73
Total Rp 776,838.98

2 1 m3 Pasang pondasi batu gunung Ex. Moramo 1 Pc : 5 Ps


BAHAN
1.1000 M3 Batu gunung Ex.Moramo @ Rp 275,000.00 Rp 302,500.00
136.0000 Kg Sement portland @ Rp 1,875.00 Rp 255,000.00
0.5440 M3 Pasir pasang @ Rp 187,500.00 Rp 102,000.00
TENAGA
0.7500 Oh Tukang Batu @ Rp 110,500.00 Rp 82,875.00
1.5000 Oh Pekerja @ Rp 85,000.00 Rp 127,500.00
0.0750 Oh Kepala tukang @ Rp 130,000.00 Rp 9,750.00
0.0750 Oh Mandor @ Rp 105,000.00 Rp 7,875.00
Sub Total Rp 887,500.00
Overhead + Profit 10 % Rp 88,750.00
Total Rp 976,250.00

3 1 m3 Pasang pondasi batu gunung Ex. Moramo 1 Pc : 3 Ps


BAHAN
1.2000 M3 Batu gunung Ex.Moramo @ Rp 275,000.00 Rp 330,000.00
202.0000 Kg Sement portland @ Rp 1,875.00 Rp 378,750.00
0.4850 M3 Pasir pasang @ Rp 187,500.00 Rp 90,937.50
TENAGA
0.7500 Oh Tukang Batu @ Rp 110,500.00 Rp 82,875.00
1.5000 Oh Pekerja @ Rp 85,000.00 Rp 127,500.00
0.0750 Oh Kepala tukang @ Rp 130,000.00 Rp 9,750.00
0.0750 Oh Mandor @ Rp 105,000.00 Rp 7,875.00
Sub Total Rp 1,027,687.50
Overhead + Profit 10 % Rp 102,768.75
Total Rp 1,130,456.25
D. PEKERJAAN BETON DAN RABAT

1 1 M3 Membuat rabat beton dan lantai kerja,1 Pc: 3 Ps: 5 Kr


BAHAN
230.0000 Kg Semen portland @ Rp 1,875.00 Rp 431,250.00
0.6379 M3 Pasir beton @ Rp 221,250.00 Rp 141,135.38
0.7607 M3 Koral beton (Split 2.3) @ Rp 500,000.00 Rp 380,350.00
200.0000 Ltr Air @ Rp 800.00 Rp 160,000.00
TENAGA
0.2000 Oh Tukang batu @ Rp 110,500.00 Rp 22,100.00
1.2000 Oh Pekerja @ Rp 85,000.00 Rp 102,000.00
0.0200 Oh Kepala Tukang @ Rp 130,000.00 Rp 2,600.00
0.0600 Oh Mandor @ Rp 105,000.00 Rp 6,300.00
Sub Total Rp 1,245,735.38
Overhead + Profit 10 % Rp 124,573.54
Total Rp 1,370,308.91

2 1 M2 Pasang Bekisting Untuk Pondasi


BAHAN
0.0400 M3 Kayu Kelas-III (Papan) @ Rp 1,300,000.00 Rp 52,000.00
0.3000 Kg Paku Biasa 2"-5" @ Rp 22,500.00 Rp 6,750.00
0.1000 Lt Minyak Bekisting @ Rp 10,000.00 Rp 1,000.00
TENAGA
0.5200 Oh Pekerja @ Rp 85,000.00 Rp 44,200.00
0.2600 Oh Tukang Batu @ Rp 110,500.00 Rp 28,730.00
0.0260 Oh Kepala Tukang @ Rp 130,000.00 Rp 3,380.00
0.0260 Oh Mandor @ Rp 105,000.00 Rp 2,730.00
Sub Total Rp 138,790.00
Overhead + Profit 10 % Rp 13,879.00
Total Rp 152,669.00

3 1M2 Pasangan bekesting untuk sloof


BAHAN
0.0450 M3 Kayu/Papan Meranti (Kayu Kelas III) @ Rp 1,300,000.00 Rp 58,500.00
0.3000 Kg Paku 2" - 5" @ Rp 22,500.00 Rp 6,750.00
0.1000 Ltr Minyak bekisting @ Rp 10,000.00 Rp 1,000.00
TENAGA
0.5200 OH Pekerja @ Rp 85,000.00 Rp 44,200.00
0.2600 OH Tukang Besi @ Rp 110,500.00 Rp 28,730.00
0.0260 Oh Kepala Tukang @ Rp 130,000.00 Rp 3,380.00
0.0260 Oh Mandor @ Rp 105,000.00 Rp 2,730.00
Sub Total Rp 145,290.00
Overhead + Profit 10 % Rp 14,529.00
Total Rp 159,819.00

4 1M2 Pasangan bekesting untuk kolom


BAHAN
0.0400 M3 Kayu Kelas-III (Papan) @ Rp 3,000,000.00 Rp 120,000.00
0.4000 Kg Paku Biasa 2"-5" @ Rp 22,500.00 Rp 9,000.00
0.2000 Lt Minyak Bekisting @ Rp 10,000.00 Rp 2,000.00
0.0150 M3 Kayu Kelas-III (Balok) @ Rp 3,000,000.00 Rp 45,000.00
0.3500 Lbr Multipleks 6 mm @ Rp 150,000.00 Rp 52,500.00
2.0000 Btg Kayu Dolken @ Rp 9,000.00 Rp 18,000.00
TENAGA
0.6600 Oh Pekerja @ Rp 85,000.00 Rp 56,100.00
0.3300 Oh Tukang Batu @ Rp 110,500.00 Rp 36,465.00
0.0330 Oh Kepala Tukang @ Rp 130,000.00 Rp 4,290.00
0.0330 Oh Mandor @ Rp 105,000.00 Rp 3,465.00
Sub Total Rp 346,820.00
Overhead + Profit 10 % Rp 34,682.00
Total Rp 381,502.00
5 1M2 Pasangan bekesting untuk balok
BAHAN
0.0400 M3 Kayu Kelas-II (Papan) @ Rp 3,000,000.00 Rp 120,000.00
0.4000 Kg Paku Biasa 2"-5" @ Rp 22,500.00 Rp 9,000.00
0.2000 Lt Minyak Bekisting @ Rp 10,000.00 Rp 2,000.00
0.0150 M3 Kayu Kelas-III (Balok) @ Rp 3,000,000.00 Rp 45,000.00
0.3500 Lbr Multipleks 6 mm @ Rp 150,000.00 Rp 52,500.00
2.0000 Btg Kayu Dolken @ Rp 9,000.00 Rp 18,000.00
TENAGA
0.6600 Oh Pekerja @ Rp 85,000.00 Rp 56,100.00
0.3300 Oh Tukang Batu @ Rp 110,500.00 Rp 36,465.00
0.0330 Oh Kepala Tukang @ Rp 130,000.00 Rp 4,290.00
0.0330 Oh Mandor @ Rp 105,000.00 Rp 3,465.00
Sub Total Rp 346,820.00
Overhead + Profit 10 % Rp 34,682.00
Total Rp 381,502.00

6 1M2 Pasangan bekesting untuk Ringbalk


BAHAN
0.0400 M3 Kayu Kelas-II (Papan) @ Rp 3,000,000.00 Rp 120,000.00
0.4000 Kg Paku Biasa 2"-5" @ Rp 22,500.00 Rp 9,000.00
0.2000 Lt Minyak Bekisting @ Rp 10,000.00 Rp 2,000.00
0.0150 M3 Kayu Kelas-III (Balok) @ Rp 3,000,000.00 Rp 45,000.00
0.3500 Lbr Multipleks 6 mm @ Rp 150,000.00 Rp 52,500.00
2.0000 Btg Kayu Dolken @ Rp 9,000.00 Rp 18,000.00
TENAGA
0.6600 Oh Pekerja @ Rp 85,000.00 Rp 56,100.00
0.3300 Oh Tukang Batu @ Rp 110,500.00 Rp 36,465.00
0.0330 Oh Kepala Tukang @ Rp 130,000.00 Rp 4,290.00
0.0330 Oh Mandor @ Rp 105,000.00 Rp 3,465.00
Sub Total Rp 346,820.00
Overhead + Profit 10 % Rp 34,682.00
Total Rp 381,502.00

7 1M2 Pasangan bekesting untuk Plat beton


BAHAN
0.0400 M3 Kayu Kelas-II (Papan) @ Rp 3,000,000.00 Rp 120,000.00
0.4000 Kg Paku Biasa 2"-5" @ Rp 22,500.00 Rp 9,000.00
0.2000 Lt Minyak Bekisting @ Rp 10,000.00 Rp 2,000.00
0.0150 M3 Kayu Kelas-III (Balok) @ Rp 3,000,000.00 Rp 45,000.00
0.3500 Lbr Multipleks 6 mm @ Rp 150,000.00 Rp 52,500.00
6.0000 Btg Kayu Dolken @ Rp 9,000.00 Rp 54,000.00
TENAGA
0.6600 Oh Pekerja @ Rp 85,000.00 Rp 56,100.00
0.3300 Oh Tukang Batu @ Rp 110,500.00 Rp 36,465.00
0.0330 Oh Kepala Tukang @ Rp 130,000.00 Rp 4,290.00
0.0330 Oh Mandor @ Rp 105,000.00 Rp 3,465.00
Sub Total Rp 382,820.00
Overhead + Profit 10 % Rp 38,282.00
Total Rp 421,102.00

8 1 M3 Membuat Beton Tak Bertulang 1 Pc : 2 Ps : 3 Kr


BAHAN
232.0000 Kg Semen Portland @ Rp 1,875.00 Rp 435,000.00
0.5200 M3 Pasir Beton @ Rp 221,250.00 Rp 115,050.00
0.7800 M3 Batu Pecah 2-3 Cm @ Rp 500,000.00 Rp 390,000.00
200.0000 Ltr Air @ Rp 800.00 Rp 160,000.00
TENAGA
1.6500 Oh Pekerja @ Rp 85,000.00 Rp 140,250.00
0.2500 Oh Tukang Batu @ Rp 110,500.00 Rp 27,625.00
0.0250 Oh Kepala Tukang @ Rp 130,000.00 Rp 3,250.00
0.0800 Oh Mandor @ Rp 105,000.00 Rp 8,400.00
Sub Total Rp 1,279,575.00
Overhead + Profit 10 % Rp 127,957.50
Total Rp 1,407,532.50
9 1M3 Membuat beton mutu, f'c=12,2 Mpa (K150) kedap air, slump (12±2) cm, w/c=0,72
BAHAN
299.0000 Kg Semen Portland @ Rp 1,875.00 Rp 560,625.00
0.5707 M3 Pasir Beton @ Rp 221,250.00 Rp 126,270.54
0.5650 M3 Batu Pecah 2-3 cm @ Rp 500,000.00 Rp 282,500.00
215.0000 Ltr Air @ Rp 800.00 Rp 172,000.00
TENAGA
1.6500 Oh Pekerja @ Rp 85,000.00 Rp 140,250.00
0.2750 Oh Tukang Batu @ Rp 110,500.00 Rp 30,387.50
0.0280 Oh Kepala Tukang @ Rp 130,000.00 Rp 3,640.00
0.1650 Oh Mandor @ Rp 105,000.00 Rp 17,325.00
Sub Total Rp 1,332,998.04
Overhead + Profit 10 % Rp 133,299.80
Total Rp 1,466,297.84

10 1M3 Membuat beton mutu, f'c=21,7 Mpa (K250) kedap air, slump (12±2) cm, w/c=0,56
BAHAN
384.0000 Kg Semen Portland @ Rp 1,875.00 Rp 720,000.00
0.6150 M3 Pasir Beton @ Rp 221,250.00 Rp 136,068.75
0.4613 M3 Batu Pecah 2-3 cm @ Rp 500,000.00 Rp 230,650.00
215.0000 Ltr Air @ Rp 800.00 Rp 172,000.00
TENAGA
1.6500 Oh Pekerja @ Rp 85,000.00 Rp 140,250.00
0.2750 Oh Tukang Batu @ Rp 110,500.00 Rp 30,387.50
0.0280 Oh Kepala Tukang @ Rp 130,000.00 Rp 3,640.00
0.1680 Oh Mandor @ Rp 105,000.00 Rp 17,640.00
Sub Total Rp 1,450,636.25
Overhead + Profit 10 % Rp 145,063.63
Total Rp 1,595,699.88

11 1 Kg Pembesian dengan Besi Polos U-24


BAHAN
1.0500 Kg Besi Beton Polos U24 @ Rp 22,500.00 Rp 23,625.00
0.0150 Kg Kawat Beton @ Rp 27,500.00 Rp 412.50
TENAGA
0.0070 Oh Pekerja @ Rp 85,000.00 Rp 595.00
0.0070 Oh Tukang Batu @ Rp 110,500.00 Rp 773.50
0.0007 Oh Kepala Tukang @ Rp 130,000.00 Rp 91.00
0.0004 Oh Mandor @ Rp 105,000.00 Rp 42.00
Sub Total Rp 25,539.00
Overhead + Profit 10 % Rp 2,553.90
Total Rp 28,092.90

12 1 M3 Pek. Sloef (150 Kg Besi + Bekisting)


BAHAN
0.0020 M3 Kayu terentang Kls III @ Rp 3,000,000.00 Rp 6,000.00
0.0100 Kg Paku 2" - 5" @ Rp 22,500.00 Rp 225.00
150.0000 Kg Besi beton polos @ Rp 22,500.00 Rp 3,375,000.00
2.2500 Kg Kawat beton @ Rp 27,500.00 Rp 61,875.00
323.0000 Kg Semen portland @ Rp 1,875.00 Rp 605,625.00
0.5200 M3 Pasir beton @ Rp 221,250.00 Rp 115,050.00
0.7800 M3 Koral beton @ Rp 500,000.00 Rp 390,000.00
TENAGA
0.0600 OH Pekerja @ Rp 85,000.00 Rp 5,100.00
0.0200 OH Tukang Batu @ Rp 110,500.00 Rp 2,210.00
0.0200 OH Tukang Kayu @ Rp 110,500.00 Rp 2,210.00
0.0200 OH Tukang Besi @ Rp 110,500.00 Rp 2,210.00
0.0060 Oh Kepala Tukang @ Rp 130,000.00 Rp 780.00
0.0030 Oh Mandor @ Rp 105,000.00 Rp 315.00
Sub Total Rp 4,566,600.00
Overhead + Profit 10 % Rp 456,660.00
Total Rp 5,023,260.00
13 1 M1 Pek. Kolom Praktis 11 x 11 cm
BAHAN
0.0020 M3 Kayu terentang Kls III @ Rp 1,300,000.00 Rp 2,600.00
0.0100 Kg Paku 2" - 5" @ Rp 22,500.00 Rp 225.00
3.0000 Kg Besi beton polos @ Rp 22,500.00 Rp 67,500.00
0.0450 Kg Kawat beton @ Rp 27,500.00 Rp 1,237.50
4.0000 Kg Semen portland @ Rp 1,875.00 Rp 7,500.00
0.0060 M3 Pasir beton @ Rp 221,250.00 Rp 1,327.50
0.0090 M3 Koral beton @ Rp 500,000.00 Rp 4,500.00
TENAGA
0.0600 OH Pekerja @ Rp 85,000.00 Rp 5,100.00
0.0200 OH Tukang Batu @ Rp 110,500.00 Rp 2,210.00
0.0200 OH Tukang Kayu @ Rp 110,500.00 Rp 2,210.00
0.0200 OH Tukang Besi @ Rp 110,500.00 Rp 2,210.00
0.0060 OH Kepala Tukang @ Rp 130,000.00 Rp 780.00
0.0030 OH Mandor @ Rp 105,000.00 Rp 315.00
Sub Total Rp 97,715.00
Overhead + Profit 10 % Rp 9,771.50
Total Rp 107,486.50

14 1 M1 Pek. Ringbalk dan Balok Latei Praktis, uk. 10 x 15 cm


BAHAN
0.0030 M3 Kayu terentang Kls III @ Rp 1,300,000.00 Rp 3,900.00
0.0200 Kg Paku 2" - 5" @ Rp 22,500.00 Rp 450.00
3.6000 Kg Besi beton polos @ Rp 22,500.00 Rp 81,000.00
0.0500 Kg Kawat beton @ Rp 27,500.00 Rp 1,375.00
5.5000 Kg Semen portland @ Rp 1,875.00 Rp 10,312.50
0.0090 M3 Pasir beton @ Rp 221,250.00 Rp 1,991.25
0.0150 M3 Koral beton @ Rp 500,000.00 Rp 7,500.00
TENAGA
0.1000 OH Pekerja @ Rp 85,000.00 Rp 8,500.00
0.0330 OH Tukang Batu @ Rp 110,500.00 Rp 3,646.50
0.0330 OH Tukang Kayu @ Rp 110,500.00 Rp 3,646.50
0.0330 OH Tukang Besi @ Rp 110,500.00 Rp 3,646.50
0.0100 OH Kepala Tukang @ Rp 130,000.00 Rp 1,300.00
0.0050 OH Mandor @ Rp 105,000.00 Rp 525.00
Sub Total Rp 127,793.25
Overhead + Profit 10 % Rp 12,779.33
Total Rp 140,572.58
E. PEKERJAAN PENUTUP LANTAI

4 1 m2 Pasang Lantai Keramik 40x40 cm anti slip


BAHAN
6.6300 Bh Keramik 40x40 @ Rp 23,333.33 Rp 154,700.00
9.8000 Kg Semen portland @ Rp 1,875.00 Rp 18,375.00
1.3000 Kg Semen warna @ Rp 1,875.00 Rp 2,437.50
0.0450 M3 Pasir pasang @ Rp 187,500.00 Rp 8,437.50
TENAGA
0.1250 Oh Tukang batu @ Rp 110,500.00 Rp 13,812.50
0.2500 Oh Pekerja @ Rp 85,000.00 Rp 21,250.00
0.0130 Oh Kepala tukang @ Rp 130,000.00 Rp 1,690.00
0.0130 Oh Mandor @ Rp 105,000.00 Rp 1,365.00
Sub Total Rp 222,067.50
Overhead + Profit 10 % Rp 22,206.75
Total Rp 244,274.25
F. PEKERJAAN DINDING BATU BATA DAN PLESTERAN

1 1 m2 Pasang bata merah 1/2 bata 1 Pc : 5 Ps


BAHAN
73.0000 Bh Batu merah @ Rp 750.00 Rp 54,750.00
9.6800 Kg Sement portland @ Rp 1,875.00 Rp 18,150.00
0.0450 M3 Pasir pasang @ Rp 187,500.00 Rp 8,437.50
TENAGA
0.1000 Oh Tukang Batu @ Rp 110,500.00 Rp 11,050.00
0.3000 Oh Pekerja @ Rp 85,000.00 Rp 25,500.00
0.0100 Oh Kepala tukang @ Rp 130,000.00 Rp 1,300.00
0.0150 Oh Mandor @ Rp 105,000.00 Rp 1,575.00
Sub Total Rp 120,762.50
Overhead + Profit 10 % Rp 12,076.25
Total Rp 132,838.75

2 1 m2 Pasang bata merah 1/2 bata 1 Pc : 2 Ps


BAHAN
70.0000 Bh Batu merah @ Rp 750.00 Rp 52,500.00
18.9500 Kg Sement portland @ Rp 1,875.00 Rp 35,531.25
0.0380 M3 Pasir pasang @ Rp 187,500.00 Rp 7,125.00
TENAGA
0.1000 Oh Tukang Batu @ Rp 110,500.00 Rp 11,050.00
0.3000 Oh Pekerja @ Rp 85,000.00 Rp 25,500.00
0.0100 Oh Kepala tukang @ Rp 130,000.00 Rp 1,300.00
0.0150 Oh Mandor @ Rp 105,000.00 Rp 1,575.00
Sub Total Rp 134,581.25
Overhead + Profit 10 % Rp 13,458.13
Total Rp 148,039.38

3 1M2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Psr


BAHAN
140.0000 Bh Batu Bata Merah @ Rp 750.00 Rp 105,000.00
22.2000 Kg Semen portland @ Rp 1,875.00 Rp 41,625.00
0.1020 M3 Pasir pasangan @ Rp 187,500.00 Rp 19,125.00
TENAGA
0.6500 OH Pekerja @ Rp 85,000.00 Rp 55,250.00
0.2000 OH Tukang Batu @ Rp 110,500.00 Rp 22,100.00
0.0200 OH Kepala Tukang @ Rp 130,000.00 Rp 2,600.00
0.0300 OH Mandor @ Rp 105,000.00 Rp 3,150.00
Sub Total Rp 248,850.00
Overhead + Profit 10 % Rp 24,885.00
Total Rp 273,735.00

4 1 m2 Plasteran transraam 1 Pc : 2 Ps, tebal 15mm


BAHAN
10.2240 Kg Sement portland @ Rp 1,875.00 Rp 19,170.00
0.0200 M3 Pasir pasang @ Rp 187,500.00 Rp 3,750.00
TENAGA
0.1500 Oh Tukang Batu @ Rp 110,500.00 Rp 16,575.00
0.3000 Oh Pekerja @ Rp 85,000.00 Rp 25,500.00
0.0150 Oh Kepala tukang @ Rp 130,000.00 Rp 1,950.00
0.0150 Oh Mandor @ Rp 105,000.00 Rp 1,575.00
Sub Total Rp 68,520.00
Overhead + Profit 10 % Rp 6,852.00
Total Rp 75,372.00
5 1 m2 Plasteran 1 Pc : 5 Ps, tebal 15mm
BAHAN
5.1480 Kg Sement portland @ Rp 1,875.00 Rp 9,652.50
0.0260 M3 Pasir pasang @ Rp 187,500.00 Rp 4,875.00
TENAGA
0.1500 Oh Tukang Batu @ Rp 110,500.00 Rp 16,575.00
0.3000 Oh Pekerja @ Rp 85,000.00 Rp 25,500.00
0.0150 Oh Kepala tukang @ Rp 130,000.00 Rp 1,950.00
0.0150 Oh Mandor @ Rp 105,000.00 Rp 1,575.00
Sub Total Rp 60,127.50
Overhead + Profit 10 % Rp 6,012.75
Total Rp 66,140.25

6 1 m2 Plasteran beton 1 Pc : 2 Ps, tebal 15mm


BAHAN
10.2240 Kg Sement Portland @ Rp 1,875.00 Rp 19,170.00
0.0200 M3 Pasir pasang @ Rp 187,500.00 Rp 3,750.00
TENAGA
0.1500 Oh Tukang Batu @ Rp 110,500.00 Rp 16,575.00
0.3000 Oh Pekerja @ Rp 85,000.00 Rp 25,500.00
0.0150 Oh Kepala tukang @ Rp 130,000.00 Rp 1,950.00
0.0150 Oh Mandor @ Rp 105,000.00 Rp 1,575.00
Sub Total Rp 68,520.00
Overhead + Profit 10 % Rp 6,852.00
Total Rp 75,372.00
G. PEKERJAAAN BESI BAJA

1 1 Kg Pasang rangka Besi baja WF


BAHAN
1.1000 Kg Besi profil WF @ Rp 22,000.00 Rp 24,200.00
0.0800 Kg Meni besi @ Rp 39,375.00 Rp 3,150.00
TENAGA
0.0060 OH Tukang Besi @ Rp 110,500.00 Rp 663.00
0.0060 OH Kepala Tukang @ Rp 130,000.00 Rp 780.00
0.0600 OH Pekerja @ Rp 85,000.00 Rp 5,100.00
0.0300 OH Mandor @ Rp 105,000.00 Rp 3,150.00
Sub Total Rp 37,043.00
Overhead + Profit 10 % Rp 3,704.30
Rp 40,747.30
2 1 Kg Pasang plat baja 6 mm
BAHAN
1.1000 Kg Plat baja 6 mm @ Rp 17,000.00 Rp 18,700.00
0.0800 Kg Meni besi @ Rp 7,500.00 Rp 600.00
TENAGA
0.0060 OH Tukang Besi @ Rp 110,500.00 Rp 663.00
0.0060 OH Kepala Tukang @ Rp 130,000.00 Rp 780.00
0.0600 OH Pekerja @ Rp 85,000.00 Rp 5,100.00
0.0300 OH Mandor @ Rp 105,000.00 Rp 3,150.00
Sub Total Rp 28,993.00
Overhead + Profit 10 % Rp 2,899.30
Rp 31,892.30
3 1 Titik Pengelasan Besi baja
BAHAN
0.0200 M1 Mesin las @ Rp 1,000,000.00 Rp 20,000.00
0.5000 Kg Kawat las @ Rp 18,000.00 Rp 9,000.00
TENAGA
0.1000 Oh Pekerja @ Rp 110,500.00 Rp 11,050.00
0.2000 Oh Mandor @ Rp 110,500.00 Rp 22,100.00
Sub Total Rp 62,150.00
Overhead + Profit 10 % Rp 6,215.00
Total Rp 68,365.00
4 1 Kg Pekerjaan Perakitan Pembesian Polos atau Ulir
BAHAN
1.1000 Kg Besi beton polos @ Rp 22,500.00 Rp 24,750.00
TENAGA
0.7000 Oh Pekerja @ Rp 85,000.00 Rp 59,500.00
0.0700 Oh Tukang Besi @ Rp 110,500.00 Rp 7,735.00
0.0070 Oh Kepala Tukang @ Rp 130,000.00 Rp 910.00
0.0040 Oh Mandor @ Rp 105,000.00 Rp 420.00
Sub Total Rp 93,315.00
Overhead + Profit 10 % Rp 9,331.50
Total Rp 102,646.50
5 1 M2 Railing Besi Hollow 4x4 cm
A. Bahan
3.1000 M1 Besi Hollow 4x4 cm @ Rp 57,500.00 Rp 178,250.00
1.0000 Ls Alat dan Bahan Las @ Rp 10,000.00 Rp 10,000.00
2.0000 Lbr Kertas Amplas @ Rp 6,757.00 Rp 13,514.00
Rp 201,764.00
Faktor Penyusutan 10% Rp 20,176.40
Total A Rp 221,940.40
B. Upah Kerja
0.1200 Oh Pekerja @ Rp 85,000.00 Rp 10,200.00
1.2000 Oh Tukang Besi @ Rp 110,500.00 Rp 132,600.00
0.0120 Oh Kepala Tukang @ Rp 130,000.00 Rp 1,560.00
0.0006 Oh Mandor @ Rp 105,000.00 Rp 63.00
Total B Rp 144,423.00
Sub Total Rp 366,363.40
Overhead + Profit 10 % Rp 36,636.34
Jadi, 1 M1 Pek. Railing Tangga = A + B Total Rp 402,999.74
6 1 M2 Membuat lantai plat besi dan rangka Baja siku L 30.30.3
A. Bahan
7.0000 Kg Besi siku L 30.30.3 @ Rp 55,000.00 Rp 385,000.00
32.5000 Kg Besi plat t. 2 mm @ Rp 28,500.00 Rp 926,250.00
Rp 1,311,250.00
Total A Rp 1,311,250.00
B. Upah Kerja
1.0500 Oh Pekerja @ Rp 85,000.00 Rp 89,250.00
1.0500 Oh Tukang Besi @ Rp 110,500.00 Rp 116,025.00
0.1050 Oh Kepala Tukang @ Rp 130,000.00 Rp 13,650.00
0.0520 Oh Mandor @ Rp 105,000.00 Rp 5,460.00
Total B Rp 224,385.00
Sub Total Rp 1,535,635.00
Overhead + Profit 10 % Rp 153,563.50
Jadi, 1 M1 Pek. Railing Tangga = A + B Total Rp 1,689,198.50

7 1 M2 Membuat Railing Pipa besi galvanis


A. Bahan
0.5000 M1 Pipa besi galvalum Ø 2", tebal 3,5 mm @ Rp 114,583.33 Rp 57,291.67
2.0000 M1 Pipa besi galvalum Ø 1,5", tebal 3,8 mm @ Rp 42,500.00 Rp 85,000.00
4.0000 titik Kawat las @ Rp 20,176.40 Rp 80,705.60
Rp 222,997.27
Faktor Penyusutan 10% Rp 22,299.73
Total A Rp 245,296.99
B. Upah Kerja
0.6500 Oh Pekerja @ Rp 85,000.00 Rp 55,250.00
0.6500 Oh Tukang Besi @ Rp 110,500.00 Rp 71,825.00
0.0650 Oh Kepala Tukang @ Rp 130,000.00 Rp 8,450.00
0.0320 Oh Mandor @ Rp 105,000.00 Rp 3,360.00
Total B Rp 138,885.00
Sub Total Rp 384,181.99
Overhead + Profit 10 % Rp 38,418.20
Jadi, 1 M1 Pek. Railing Tangga = A + B Total Rp 422,600.19

8 1 M2 Membuat Railing Staenless steel


A. Bahan
0.5000 M1 Pipa Staenless Ø 2" @ Rp 55,000.00 Rp 27,500.00
2.0000 M1 Pipa Staenless Ø 1,5" @ Rp 42,500.00 Rp 85,000.00
1.5000 titik Kawat las @ Rp 68,365.00 Rp 102,547.50
Rp 215,047.50
Faktor Penyusutan 10% Rp 21,504.75
Total A Rp 236,552.25
B. Upah Kerja
0.6500 Oh Pekerja @ Rp 85,000.00 Rp 55,250.00
0.6500 Oh Tukang Besi @ Rp 110,500.00 Rp 71,825.00
0.0650 Oh Kepala Tukang @ Rp 130,000.00 Rp 8,450.00
0.0320 Oh Mandor @ Rp 105,000.00 Rp 3,360.00
Total B Rp 138,885.00
Sub Total Rp 375,437.25
Overhead + Profit 10 % Rp 37,543.73
Jadi, 1 M1 Pek. Railing Tangga = A + B Total Rp 412,980.98
H. PEKERJAAN SANITASI

1 Memasang 1 bh kloset Jongkok


BAHAN
1.0000 Bh Kloset Jongkok @ Rp 350,000.00 Rp 350,000.00
6.0000 Kg Semen Portland @ Rp 1,875.00 Rp 11,250.00
0.0100 M3 Pasir pasang @ Rp 187,500.00 Rp 1,875.00
TENAGA
1.5000 Oh Tukang batu @ Rp 110,500.00 Rp 165,750.00
1.0000 Oh Pekerja @ Rp 85,000.00 Rp 85,000.00
0.1500 Oh Kepala tukang @ Rp 130,000.00 Rp 19,500.00
0.1600 Oh Mandor @ Rp 105,000.00 Rp 16,800.00
Sub Total Rp 650,175.00
Overhead + Profit 10 % Rp 65,017.50
Total Rp 715,192.50

2 Memasang 1 bh Kran dia.1/2"


BAHAN
1.0000 Bh Kran air 1/2" @ Rp 37,500.00 Rp 37,500.00
0.0250 Bh Seal tape @ Rp 6,875.00 Rp 171.88
TENAGA
0.4000 Oh Tukang batu @ Rp 110,500.00 Rp 44,200.00
0.0100 Oh Pekerja @ Rp 85,000.00 Rp 850.00
0.0400 Oh Kepala tukang @ Rp 130,000.00 Rp 5,200.00
0.0050 Oh Mandor @ Rp 105,000.00 Rp 525.00
Sub Total Rp 88,446.88
Overhead + Profit 10 % Rp 8,844.69
Total Rp 97,291.56

3 Memasang Floor Drain


BAHAN
1.0000 Bh Floor drain @ Rp 35,000.00 Rp 35,000.00
TENAGA
0.1000 Oh Tukang batu @ Rp 110,500.00 Rp 11,050.00
0.0100 Oh Pekerja @ Rp 85,000.00 Rp 850.00
0.0100 Oh Kepala tukang @ Rp 130,000.00 Rp 1,300.00
0.0050 Oh Mandor @ Rp 105,000.00 Rp 525.00
Sub Total Rp 48,725.00
Overhead + Profit 10 % Rp 4,872.50
Total Rp 53,597.50

4 1 M' Memasang pipa PVC dia 1/2"


BAHAN
1.2000 M' Pipa PVC dia 1/2 " @ Rp 5,312.50 Rp 6,375.00
0.3500 % Perlengkapan (harga pipa) @ Rp 5,312.50 Rp 1,859.38
TENAGA
0.0600 Oh Tukang @ Rp 110,500.00 Rp 6,630.00
0.0360 Oh Pekerja @ Rp 85,000.00 Rp 3,060.00
0.0060 Oh Kepala tukang @ Rp 130,000.00 Rp 780.00
0.0020 Oh Mandor @ Rp 105,000.00 Rp 210.00
Sub Total Rp 18,914.38
Overhead + Profit 10 % Rp 1,891.44
Total Rp 20,805.81
5 1 M' Memasang pipa PVC dia 2"
BAHAN
1.2000 M' Pipa PVC dia 2" @ Rp 20,625.00 Rp 24,750.00
0.3500 % Perlengkapan (harga pipa) @ Rp 20,625.00 Rp 7,218.75
TENAGA
0.1350 Oh Tukang @ Rp 110,500.00 Rp 14,917.50
0.0810 Oh Pekerja @ Rp 85,000.00 Rp 6,885.00
0.0135 Oh Kepala tukang @ Rp 130,000.00 Rp 1,755.00
0.0040 Oh Mandor @ Rp 105,000.00 Rp 420.00
Sub Total Rp 55,946.25
Overhead + Profit 10 % Rp 5,594.63
Total Rp 61,540.88

6 1 M' Memasang pipa PVC dia 4"


BAHAN
1.2000 M' Pipa PVC dia4" @ Rp 63,437.50 Rp 76,125.00
0.3500 % Perlengkapan (harga pipa) @ Rp 63,437.50 Rp 22,203.13
TENAGA
0.1350 Oh Tukang @ Rp 110,500.00 Rp 14,917.50
0.0810 Oh Pekerja @ Rp 85,000.00 Rp 6,885.00
0.0135 Oh Kepala tukang @ Rp 130,000.00 Rp 1,755.00
0.0040 Oh Mandor @ Rp 105,000.00 Rp 420.00
Sub Total Rp 122,305.63
Overhead + Profit 10 % Rp 12,230.56
Total Rp 134,536.19

7 1 Unit plat beton bertulang Penutup Septitank


3.0820 M2 Bekisting @ Rp 421,102.00 Rp 1,297,836.36
66.9198 Kg Pembesian @ Rp 28,092.90 Rp 1,879,971.81
0.2640 M3 Beton Mutu K-250 @ Rp 1,595,699.88 Rp 421,264.77
Total Rp 3,599,072.94

8 1 Unit Septictank dan Peresapan


BAHAN
8.8070 M3 Galian Tanah Biasa @ Rp 47,272.50 Rp 416,328.91
1.8940 M2 Pas. Trasram 1/2 Bata 1 : 2 @ Rp 148,039.38 Rp 280,386.58
1.2810 M3 Urugan Pasir @ Rp 177,375.00 Rp 227,217.38
2.1690 M3 Urugan Tanah Kembali @ Rp 52,525.00 Rp 113,926.73
14.4400 M2 Plesteran Trasram 1 2 Tebal 15 mm @ Rp 75,372.00 Rp 1,088,371.68
1.3500 M2 Ijuk @ Rp 90,000.00 Rp 121,500.00
0.3810 M3 Plat Beton Bertulang 1:2:3 T=10 cm @ Rp 3,599,072.94 Rp 1,371,246.79
14.4400 M2 Acian Semen @ Rp 40,143.13 Rp 579,666.73
0.6000 M1 Pipa Hawa Galvanis Dia.1" @ Rp 20,625.00 Rp 12,375.00
0.9000 M3 Kerikil Beton @ Rp 500,000.00 Rp 450,000.00
4.0000 M1 PVC Dia.4"+ Dipasang+ ambungan @ Rp 63,437.50 Rp 253,750.00
TENAGA
2.0000 Oh Tukang Batu @ Rp 110,500.00 Rp 221,000.00
3.2700 Oh Pekerja @ Rp 85,000.00 Rp 277,950.00
0.1000 Oh Kepala tukang @ Rp 130,000.00 Rp 13,000.00
0.1500 Oh Mandor @ Rp 105,000.00 Rp 15,750.00
Sub Total Rp 5,442,469.78
Overhead + Profit 10 % Rp 544,246.98
Total Rp 5,986,716.76
L. PEKERJAAN FINISHING

1 1 m2 pengecatan bidang kayu baru (1 lapis meni, 1 lapis cat dasar,1 lapis cat penutup)

0.2000 Kg Cat meni kayu @ Rp 48,750.00 Rp 9,750.00


0.3500 Kg Cat penutup Ec. Avian/setara @ Rp 48,750.00 Rp 17,062.50
0.0100 Kg kuas @ Rp 18,000.00 Rp 180.00
0.0300 Kg Pengencer/Tenner @ Rp 35,000.00 Rp 1,050.00
0.2000 Kg Ampelas @ Rp 6,375.00 Rp 1,275.00
TENAGA
0.1050 Oh Tukang cat @ Rp 110,500.00 Rp 11,602.50
0.0700 Oh Pekerja @ Rp 85,000.00 Rp 5,950.00
0.0040 Oh Kepala tukang @ Rp 130,000.00 Rp 520.00
0.0030 Oh Mandor @ Rp 105,000.00 Rp 315.00
Sub Total Rp 47,705.00
Overhead + Profit 10 % Rp 4,770.50
Total Rp 52,475.50

2 1 m2 pengecatan tembok baru (1 lapis Plamir, 1 Lapis cat dasar,1 lapis cat penutup)

BAHAN
0.1000 Kg Plamir @ Rp 10,625.00 Rp 1,062.50
0.2600 Kg Cat penutup @ Rp 128,750.00 Rp 33,475.00
TENAGA
0.0630 Oh Tukang cat @ Rp 110,500.00 Rp 6,961.50
0.0200 Oh Pekerja @ Rp 85,000.00 Rp 1,700.00
0.0063 Oh Kepala tukang @ Rp 130,000.00 Rp 819.00
0.0030 Oh Mandor @ Rp 105,000.00 Rp 315.00
Sub Total Rp 44,333.00
Overhead + Profit 10 % Rp 4,433.30
Total Rp 48,766.30

3 1 m2 pengecatan tembok Weather Shield Exterior (anti lumut) (1 Lapis cat dasar,1 lapis cat penutup)

BAHAN
0.1000 Kg Cat dasar @ Rp 22,000.00 Rp 2,200.00
0.2600 Kg Cat penutup @ Rp 128,750.00 Rp 33,475.00
TENAGA
0.0630 Oh Tukang cat @ Rp 110,500.00 Rp 6,961.50
0.0200 Oh Pekerja @ Rp 85,000.00 Rp 1,700.00
0.0063 Oh Kepala tukang @ Rp 130,000.00 Rp 819.00
0.0030 Oh Mandor @ Rp 105,000.00 Rp 315.00
Sub Total Rp 45,470.50
Overhead + Profit 10 % Rp 4,547.05
Total Rp 50,017.55
4 1 m2 pengecatan langit-langit plafond (1 lapis Plamir Compound, 1 Lapis cat dasar,1 lapis cat penutup)

BAHAN
0.1000 Kg Cat tembok (dasar) @ Rp 22,000.00 Rp 2,200.00
0.2600 Kg Cat tembok (penutup) @ Rp 128,750.00 Rp 33,475.00
0.1000 Lbr Amplas @ Rp 6,757.00 Rp 675.70
0.0500 Kg Plamir @ Rp 10,625.00 Rp 531.25
0.1000 Kg Lem fox @ Rp 19,700.00 Rp 1,970.00
TENAGA
0.0630 Oh Tukang cat @ Rp 110,500.00 Rp 6,961.50
0.0200 Oh Pekerja @ Rp 85,000.00 Rp 1,700.00
0.0063 Oh Kepala tukang @ Rp 130,000.00 Rp 819.00
0.0025 Oh Mandor @ Rp 105,000.00 Rp 262.50
Sub Total Rp 48,594.95
Overhead + Profit 10 % Rp 4,859.50
Total Rp 53,454.45

5 1 m2 Pekerjaan acian semen


BAHAN
3.2500 Kg. Semen @ Rp 1,875.00 Rp 6,093.75
TENAGA
0.1000 Oh Tukang Batu @ Rp 110,500.00 Rp 11,050.00
0.2000 Oh Pekerja @ Rp 85,000.00 Rp 17,000.00
0.0100 Oh Kepala tukang @ Rp 130,000.00 Rp 1,300.00
0.0100 Oh Mandor @ Rp 105,000.00 Rp 1,050.00
Sub Total Rp 36,493.75
Overhead + Profit 10 % Rp 3,649.38
Total Rp 40,143.13

6 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter


BAHAN
0.3500 Ltr Residu/Ter @ Rp 17,000.00 Rp 5,950.00
TENAGA
0.1000 OH Pekerja @ Rp 85,000.00 Rp 8,500.00
0.0060 OH Mandor @ Rp 105,000.00 Rp 630.00
Sub Total Rp 15,080.00
Overhead + Profit 10 % Rp 1,508.00
Total Rp 16,588.00

7 1 m2 pengecatan bidang besi (1 lapis meni, 1 lapis cat dasar,1 lapis cat penutup)
BAHAN
0.1100 Kg Cat meni besi @ Rp 48,750.00 Rp 5,362.50
0.1700 Kg Cat dasar @ Rp 48,750.00 Rp 8,287.50
0.0800 Kg Cat penutup Ec. Avian/setara @ Rp 48,750.00 Rp 3,900.00
0.0100 Kg kuas @ Rp 18,000.00 Rp 180.00
0.0100 Kg Pengencer/Tenner @ Rp 35,000.00 Rp 350.00
TENAGA
0.0800 Oh Tukang cat @ Rp 110,500.00 Rp 8,840.00
0.4000 Oh Pekerja @ Rp 85,000.00 Rp 34,000.00
0.0800 Oh Kepala tukang @ Rp 130,000.00 Rp 10,400.00
0.0200 Oh Mandor @ Rp 105,000.00 Rp 2,100.00
Sub Total Rp 73,420.00
Overhead + Profit 10 % Rp 7,342.00
Total Rp 80,762.00
DAFTAR HARGA BARANG DAN UPAH KERJA

PEKERJAAN : PEMBANGUNAN JALAN SETAPAK KAWASAN TRACK WISATA ALAM


LOKASI : AIR TERJUN, DESA SUMBER SARI, KEC. MORAMO, KAB. KONAWE SELATAN
TAHUN ANGGARAN : 2019

NO TENAGA SAT UPAH/HARGA

1 2 3 4
I UPAH TENAGA
1 Mandor OH Rp 105,000.00
2 Kepala tukang OH Rp 130,000.00
3 Tukang Listrik OH Rp 110,500.00
4 Tukang kayu OH Rp 110,500.00
5 Tukang batu OH Rp 110,500.00
6 Tukang besi OH Rp 110,500.00
7 Tukang Cat OH Rp 110,500.00
8 Tukang Plafond OH Rp 110,500.00
9 Tukang Bongkar OH Rp 110,500.00
10 Pekerja OH Rp 85,000.00
II BAHAN MATERIAL
A. BAHAN DASAR
1 Tanah urug M3 Rp 87,500.00
2 Pasir urug M3 Rp 112,250.00
3 Pasir pasangan M3 Rp 187,500.00
4 Pasir beton M3 Rp 221,250.00
5 Batu belah gunung M3 Rp 275,000.00
6 Batu bata Bh Rp 750.00
7 Beton roster/kerawang Bh Rp 7,850.00
8 Koral beton/Split 2-3 cm M3 Rp 500,000.00
9 Koral beton/Split 1-2 cm M3 Rp 500,000.00
10 Semen Portland Kg Rp 1,875.00
11 Semen warna Kg Rp 1,875.00
12 Semen putih Kg Rp 1,875.00
13 Paving block Bh Rp 1,825.00
14 Air kerja Ltr Rp 800.00
15 Sirtu M3 Rp 198,500.00
16 Perancah / Scaffolding Unit Rp 3,000.00

B. BAHAN LANTAI
1 Tegel Keramik 40x40 cm anti slip Bh Rp 23,333.33
2 Tegel keramik 25x40 cm Bh Rp 10,500.00
3 Tegel keramik 25x25 cm anti slip Bh Rp 5,312.50
4 Kuku keramik M1 Rp 15,000.00
C. BAHAN KAYU
1 Dolken kayu dia 8 - 12 cm Btg. Rp 9,000.00
2 Papan Kayu kelas I M3 Rp 5,670,000.00
3 Balok Kayu Kelas I M3 Rp 5,670,000.00
4 Papan kayu Kelas II M3 Rp 3,500,000.00
5 Balok Kayu Kelas II M3 Rp 3,500,000.00
6 Papan kayu Kelas III M3 Rp 3,000,000.00
7 Balok Kayu Kelas III M3 Rp 3,000,000.00
8 Papan/balok kayu kelas IV (bekisting) M3 Rp 1,300,000.00
9 Multipleks 6 mm Lbr Rp 150,000.00
E. BAHAN ATAP
1 Atap Spandek P. 170 cm Lbr Rp 65,000.00
2 Seng gelombang bjls 28 kk Rp 8,000.00
3 Nok Metal spandek Lbr Rp 25,000.00
4 Papan Lisplank M1 Rp 8,750.00

Page 48 HARGA
F. BAHAN BESI
1 Kawat beton Kg Rp 27,500.00
2 Besi Beton polos Kg Rp 22,500.00
3 Paku biasa 2"-5" Kg Rp 22,500.00
4 Paku Sekrup Kg Rp 41,250.00
5 Paku tripleks Kg Rp 35,000.00
6 Paku seng Kg Rp 40,000.00
7 Baut Angker Btg. Rp 8,000.00
8 Baut dia. 14 mm buah Rp 15,000.00
9 Baut dia. 10 mm Buah Rp 10,000.00
10 Mesin Las Unit Rp 1,000,000.00
11 Kawat las Kg Rp 18,000.00
12 Besi Hollow 4x4 cm M1 Rp 57,500.00
13 Besi Hollow 2x4 cm M1 Rp 28,500.00
14 Besi siku 30.30.3 Kg Rp 55,000.00
15 Besi Baja WF Kg. Rp 22,000.00
16 Besi plat Kg Rp 22,000.00
17 Paku beton Kg. Rp 45,000.00
18 Pipa besi galvanis Ø 2", 3,6 mm M1 Rp 114,583.33
19 Pipa besi galvalum Ø 1,5", 3,2 mm M1 Rp 84,333.33
20 Pipa Staenless steel Ø 2" M1 Rp 55,000.00
21 Pipa Staenless steel Ø 1,5" M1 Rp 42,500.00
22 Staenless steel Kotak 4x4 cm M1 Rp 43,000.00
23 Turnbuckle Ø 10 mm Bh Rp 33,000.00
24 Klem Turnbuckle Ø 10 mm Bh Rp 9,000.00
25 Slig besi Ø 10 mm M1 Rp 50,000.00
G. BAHAN CAT
1 Plamur tembok Kg. Rp 10,625.00
2 Plamir kayu Kg. Rp 15,000.00
3 Dempul Kayu Kg Rp 23,750.00
4 Cat kilap kayu setara glotex Kg Rp 48,750.00
5 Cat kilap kayu setara avian Kg Rp 48,750.00
6 Cat dasar/kayu/tembok Kg Rp 22,000.00
7 Cat Vernis Kayu Standart Kg Rp 35,000.00
8 Cat tembok Kg Rp 128,750.00
9 Cat Weather Shield Exterior (anti lumut) Kg Rp 128,750.00
10 Cat kayu kilap standart Kg Rp 48,750.00
11 Cat besi Kg Rp 48,750.00
12 Cat Politur Kg Rp 36,562.50
13 Residu/Ter Liter Rp 17,000.00
14 Minyak cat (Thiner) Ltr Rp 35,000.00
15 Lem fox/ lem kayu Kg. Rp 19,700.00
16 Kuas biasa 3" Bh. Rp 18,000.00
17 Kuas biasa 4" Bh. Rp 24,684.00
18 Kuas biasa 5" Bh. Rp 24,684.00
19 Kuas Roll Bh. Rp 65,000.00
20 Ampelas halus Lbr Rp 6,375.00
21 Ampelas kasar Lbr Rp 6,757.00
22 Meni besi Kg Rp 39,375.00
23 Meni kayu Kg Rp 39,375.00
24 Minyak bekisting ltr Rp 10,000.00
25 Cat anti karat Kg Rp 35,750.00
I BAHAN INSTALASI LISTRIK
1 MCB 6 A Ex. Broco Bh Rp 42,500.00
2 Box MCB 6 A, Ex. Broco Bh Rp 8,000.00
3 Saklar ganda Bh Rp 34,000.00
4 Saklar tunggal Bh Rp 26,000.00
5 Stop Kontak Bh Rp 20,000.00
6 Kabel NYA 2,5 mm, Ex. Eterna m1 Rp 5,811.00
7 Kabel NYA 3x4 mm2 Ex. Eterna m1 Rp 14,805.00
8 Kabel arde 10 mm m1 Rp 16,000.00
9 Pipa listrik 5/8 inchi, Ex Clipsal Btg Rp 9,000.00
10 Inbow Dos Bh Rp 2,000.00

Page 49 HARGA
11 Isolasi Listrik, Ex. Unibell Roll Rp 7,500.00
12 Isolator + paku Bh Rp 700.00
13 Fitting lampu putih, Ex. Broco Bh Rp 6,000.00
14 Instalasi Listrik Titik Rp 250,000.00
15 Lampu LED 5 watt Bh Rp 27,000.00

Page 50 HARGA
J BAHAN SANITER
1 Kloset Jongkok Bh. Rp 350,000.00
2 Floor drain Bh. Rp 35,000.00
3 Kran air dia 1/2" Bh. Rp 37,500.00
4 Seal tape Bh. Rp 6,875.00
5 Pipa PVC AW dia. 1/2" M1 Rp 5,312.50
6 Pipa PVC dia 2'' M1 Rp 20,625.00
7 Pipa PVC dia. 4" M1 Rp 63,437.50
8 Lem pipa Bh Rp 13,000.00
9 Sambungan L pipa 1/2" Bh Rp 6,000.00
10 Sambungan L pipa 2" Bh Rp 9,000.00
11 Sambungan L pipa 4" Bh Rp 16,000.00
12 Pompa air PS-226 bit ex. Shimizu Bh Rp 1,200,000.00
13 Tangki air kapasitas 1200 liter Bh Rp 2,000,000.00
14 Stop kran 1/2" Bh Rp 20,000.00
15 Ijuk M2 Rp 90,000.00
K BAHAN PINTU DAN JENDELA
1 Pintu + kusen Aluminium Toilet BH Rp 350,000.00
2 Handel Pintu Aluminium Psg Rp 200,000.00
3 Skrup fixer BH Rp 2,000.00
I. BAHAN PENGGANTUNG
1 Kunci tanam pintu Bh. Rp 262,500.00
2 Kunci tanam biasa Bh. Rp 231,250.00
3 Grendel Jendela psg Rp 9,375.00
4 Grendel Pintu psg Rp 13,125.00
5 Engsel Pintu H kuningan Bh. Rp 13,125.00
6 Engsel jendela kuningan Bh. Rp 9,750.00
7 Kait angin Bh. Rp 20,000.00
M BAHAN MESIN DAN ALAT KERJA
1 Mesin Gerinda tangan Unit Rp 2,775,000.00
2 Mesin potong keramik Unit Rp 1,200,000.00
3 Palu besar Unit Rp 150,000.00

Page 51 HARGA
PERHITUNGAN VOLUME

PERHITUNGAN VOLUME
NO. URAIAN PEKERJAAN TYPE KETERANGAN SKETSA GAMBAR
Panjang Lebar Tinggi Kuantitas Luas Tebal Volume
1 2 3 4 5 6 7 8 9 10 11

I PEKERJAAN TANAH DAN PASIR


1 Pek. Galian Tanah Pondasi

1.1 Pek. Galian Tanah Pondasi menerus pondasi grs 24.00 0.70 0.80 13.44 Menerus
13.44

2 Pek. Urugan Tanah Alur Pondasi

3 Pek. Urugan Pasir Alas Pondasi menerus 24.00 0.70 0.05 0.84

0.84

4 Pek. Urugan Tanah Alas Lantai 0.08 16.00 1.28 B. Utama


1.28

5 Pek. Urugan Pasir Alas Lantai 0.05 16.00 0.80 B. Utama


0.00 Carport
0.80

Pek. Urugan pasir bawah pondasi t = 5 cm 24.00 0.70 0.05 0.84

6 Pek. Urugan pasir bawah pondasi dan rabat beton keliling t = 5 cm 22.00 0.50 0.05 0.55

II PEKERJAAN BATU, PASANGAN DAN PLESTERAN


1 Pek. Batu Kosong 24.00 0.70 0.15 2.52 Pondasi Menerus
0.25
2.77
2 Pek. Pasangan Pondasi Batu Gunung 1 : 5 pondasi P1 24.00 0.43 0.60 6.12
6.12
0.31
6.43
3 Pek. Pasangan Bata Merah 1/2 Bata 1 : 5 Volume keseluruhan (sebelum dikurangi bukaan) …………………….(a)
dinding lt. 01 24.00 0.70 16.80
0.00
16.80
3.36 10 %
20.16
Bukaan (kusen jendela, pintu dan lain-lain) …………….……………..(b)
Pintu 0.70 0.35 8.00 1.96 pintu KM/WC 2 unit
0.00
0.00
0.00
0.00
1.96
Jumlah total (a - (b+c)) 18.20

5 Pek. Plesteran dinding, 1Pc : 5Psr Volume keseluruhan (sebelum dikurangi bukaan) …………………….(a)
24.00 0.70 16.80 Utama
16.80
Bukaan (kusen jendela, pintu dan lain-lain) ……………………………..(b)
Pintu 0.70 0.70 8.00 3.92

3.92
Jumlah total (a - b) 12.88

5 Pek. Pasangan dinding bata 1Pc : 2Psr Volume keseluruhan (sebelum dikurangi bukaan) …………………….(a)
24.00 0.70 16.80 Toilet
16.80
Bukaan (kusen jendela, pintu dan lain-lain) ……………………………..(b)
0.70 1.65 8.00 9.24
9.24
Jumlah total (a - b) 7.56
0.76
8.32

7 Pek. Plesteran Beton 1 : 2 Lantai 1


K (20/20) 1 0.50 2.40 4.00 4.80
K (20/20) 2 0.35 2.40 4.00 3.36
8.16
8 Pek. Plesteran Pondasi 1 : 2 0.00

9 0.00
9.00 Kurang
-9.00
-0.45
-9.45

III PEKERJAAN BETON


I PEKERJAAN SLOEF BETON
a. Pek. Bekisting 24.00 0.20 2.00 9.60
0.00
9.60

b. Pek. Pembesian 24.00 4.00 0.00


0.00
0.00

c. Pek. Sloef beton (S) Ukuran ; 15x20 cm 24.00 0.15 0.20 0.72
0.00
0.72

2 PEKERJAAN KOLOM
a. Pek. Bekisting 0.80 2.50 6.00 12.00
0.00
12.00

b. Pek. Pembesian 0.00


0.00
0.00

c. Pek. Kolom beton (K) Ukuran ; 20x20 cm 0.20 0.20 2.50 6.00 0.60
0.00
0.60

3 PEKERJAAN RINGBALOK
a. Pek. Bekisting 24.00 0.20 2.00 9.60
0.00
9.60

b. Pek. Pembesian 0.00


0.00
0.00

c. Pek. Ring balok (S1) ukuran ; 15x20 cm 24.00 0.15 0.20 0.72
0.00
0.72

4 PEKERJAAN DAK/PLAT BETON


a. Pek. Bekisting 7.00 5.00 35.00 alas dak
20.00 0.10 2.00 pinggir dak beton
37.00

b. Pek. Pembesian 0.00


0.00
0.00

c. Pek. Dak beton 1 : 2 : 3, tebal 10 cm 7.00 5.00 0.10 3.50


0.35
3.85
5 PEKERJAAN RABAT BETON
a. Pek. Rabat beton bawah lantai 1 : 3 : 5 6.00 4.00 0.05 1.20
0.12
1.32

0 Pek. Rabat beton Keliling 1 : 3 : 5 22.00 0.60 0.05 0.66


0.07
0.73

IV PEKERJAAN KAP, KUDA-KUDA DAN ATAP


1 0 KK1 0.00
KK2 0.00

0.00
0.00 10%
0.00

0 KK1 0.00
KK2 0.00
0.00
0.00 10%
0.00

2 0 0.00
0.00
0.00
0.00

4 Pek. Papan Lisplank 0.00


6 Pek. Nok Atap Sakura Roof 0.00
0.00

7 Pek. Talang Seng Plat BJLS 30 0.00


0.00

VI PEKERJAAN LANTAI & RABAT BETON


1 Pas. Lantai Keramik anti slip, 25x25 cm lantai 6.00 4.00 24.00
0.00
24.00
2.40
26.40

2 Pas. Dinding keramik toilet, 25x40 cm KM/WC 5.70 1.60 8.00 72.96 KM/WC 2 unit
0.00
72.96
72.96

4 Pas. Tegel keramik kuku 0.60 8.00 4.80


4.80
0.48
5.28

0.00

I PEKERJAAN FINISHING DAN LAIN-LAIN


1 Cat dinding tembok dan kolom, ex. Propan atau setara
0.00
0.00

0.00
0.00

0.00

2 Cat dak beton Weathershield Ex. Propan 7.00 3.00 21.00 atas dak
20.00 0.10 2.00 pinggir dak beton
7.00 3.00 21.00 alas dak
44.00
PERHITUNGAN VOLUME

PERHITUNGAN VOLUME

NO. URAIAN PEKERJAAN TYPE vol. panjang Berat besi / Berat Jenis KETERANGAN
Panjang Lebar Tinggi Kuantitas Luas Tebal Volume
besi m1 besi

1 2 3 4 5 6 7 8 9 10

PEKERJAAN JEMBATAN GANTUNG (BENTANG 26 M)


PEKERJAAN PERSIAPAN, PEMBONGKARAN DAN PERBAIKAN

luas area
luas area
Sewa Pemasangan perancah / Scaffolding main frame 1,7 m jarak kerja scaffolding
1.29 1.219 1.7 2.193 142.270861833
312
per unit = 4000 per hari
jumlah hari = 60 hari kalender
=4.000 x 142 unit 568000
34,080,000.00
120 unit
30 hari

II PEKERJAAN TANAH DAN PASIR


1 Pek. Galian Tanah Pondasi

1.1 Pek. Galian Tanah Pondasi menerus pondasi grs 44.00 0.70 0.80 24.64 Menerus
24.64

2 Pek. Urugan Tanah Alur Pondasi

3 Pek. Urugan tanah bekas galian (1/4 dari total galian) menerus 44.00 0.70 0.05 1.54

1.54

4 Pek. Urugan tanah bawah lantai (didatangkan dan dipadatkan) 0.08 24.00 1.92 B. Utama
1.92

5 Pek. Urugan pasir bawah lantai tebal 5 cm 0.05 24.00 1.20 B. Utama
0.00 Carport
1.20

6 Pek. Urugan pasir bawah pondasi t = 5 cm


6 Pek. Urugan Pasir Alas Rabat Beton 0.00

III PEKERJAAN JEMBATAN GANTUNG (BENTANG 26 M)


A. PEKERJAAN PERSIAPAN, PEMBONGKARAN DAN PERBAIKAN
1 Pek. pembongkaran lantai papan kayu eksisting 26.00 1.98 51.48

2 Pek. Pembongkaran besi gantung, besi sling dan mur baut 1.00 1.00

3 Pek. Las Perbaikan Railing Pipa besi Ø 2" dan besi Ø 1" 60.00 60.00

B PEKERJAAN BESI
1 Pek. Pas. Besi gantung vertikal Ø 16" pasang baru titik 1 4.56 4.00 1.580 28.82
titik 2 3.55 4.00 1.580 22.44
titik 3 2.55 4.00 1.580 16.12
titik 4 1.80 4.00 1.580 11.38
titik 5 1.50 4.00 1.580 9.48
titik 6 1.10 4.00 1.580 6.95
95.18
9.52 10 %
104.70

#REF! ### 3 26.00 0.888 69.26

2 Pas. Baut sambungan baja Ø 14 mm 112.00 112.00

3 Pek. Lantai Plat besi t. 2 mm + rangka Besi siku L 30.30.3 26.00 2.00 0.002 7,850 816.40

4 Pek. Las plat lantai besi pasang baru 208.00 208.00


159.00 159.00
367.00

5 Pas. Mur Baut lantai plat besi 416.00 416.00

8 Pek. Pas. Railing besi baru Ø 2" & 1,5" pipa 2 " 6.00 3.87 23.24
pipa 1,5 " 6.00 5.31 31.86
55.10
3.00 0.70 2.10

PEKERJAAN FINISHING
Pek. Cat semprot besi baja eksisting

Pek. Cat Semprot Railing pipa besi eksisting

Pek. Cat Besi rangka lantai plat besi, hollow 4x4 cm besi memanjang 78.00 0.16 12.48
besi melintang 106.00 0.16 16.96
29.44
2.94
32.38

Pek. Cat lantai Plat besi 26.00 2.00 52.00


5.20
57.20
IV PEKERJAAN JEMBATAN 1 (BENTANG 12,3 M)
A. PEKERJAAN PERSIAPAN DAN PEMBONGKARAN
1 Pek. pembongkaran lantai papan dan railing kayu lama 12.30 2.00 24.60
2 Pek. Pembongkaran abutment lama abudmen 2 2.00 0.50 1.10 1.10
abudmen 3 2.00 0.50 0.80 0.80
abudmen 4 2.00 0.50 0.70 0.70
2.60

B PEKERJAAN REHABILITASI ABUTMENT LAMA


1 Pek. Pas. Batu gunung, camp. 1PC : 3 Psr Abutment 2
Abutment 3

2 Pek. Plesteran camp. 1PC : 2 Psr abudmen 1 3.80 0.60 0.90 2.05
abudmen 4 3.80 0.60 0.70 1.60
3.65

3 Pek. Acian semen abudmen 1 2.80 0.40 0.90 1.01


abudmen 4 2.80 0.40 0.70 0.78
1.79

C PEKERJAAN ABUTMENT BARU


1 Pek. Batu kosong uk. 10 cm abutment 2 2.00 1.00 0.20 0.40
abutment 3 2.00 1.00 0.20 0.40
0.80

2 Pek. Pondasi beton, camp. 1PC : 2 Psr : 3 Krkl abutment 2 2.00 0.60 1.10 1.32
2.00 1.00 0.30 0.60

abutment 3 2.00 0.60 1.00 1.20


2.00 1.00 0.30 0.60
3.72

3 Pek. Plesteran camp. 1PC : 2 Psr abutment 2 5.20 1.10 5.72


abutment 3 5.20 1.00 5.20
10.92

4 Pek. Acian semen abutment 2 5.20 1.10 5.72


abutment 3 5.20 1.00 5.20
10.92

D PEKERJAAN BETON
1 Pek. Beton alas gelagar baja
a. Pek. Bekisting abutment 2 4.80 0.40 0.30 0.58
abutment 3 4.80 0.40 0.30 0.58
1.15

b. Pek. Pembesian abutment 2


besi 12 16.80 0.89 14.92 berat besi 12 = 0.888
besi 8 0.72 14.33 10.32 0.40 0.28 berat besi 8 = 0.395

abutment 3
besi 12 16.80 0.89 14.92 berat besi 12 = 0.888
besi 8 0.72 14.33 10.32 0.40 0.28 berat besi 8 = 0.395
30.41

c. Pek. Balok beton 40/30 cm, beton mutu K-250 abutment 2 2.00 0.40 0.30 0.24
abutment 3 2.00 0.40 0.30 0.24
0.48
#REF! ###
#REF! ### 24.60 21.33 524.79 Besi WF 200x100x55x8

#REF! ### 18.00 14.00 252.00 Besi WF 200x100x55x8

#REF! ### 72.00 72.00 1. pertemuan antara


baja gelagar dan baja tiang
2. pertemuan antara tiang
#REF! ### gelagar dan railing kayu besi

#REF! ###
#REF! ### 12.30 2.00 0.06 1.48
0.15 10 %
1.62

#REF! ### 12.30 0.14 4.00 0.06 0.41


0.04 10 %
0.45
PEKERJAAN LANTAI
Pek. Tegel Keramik 40 x 40 cm anti slip 12.30 2.00 24.60
2.46
27.06

#REF! ###
#REF! ### 12.30 0.40 4.92

#REF! ### 12.30 2.00 24.60

F PEKERJAAN LAIN-LAIN
1 Pekerjaan Pembersihan sisa-sisa material

V PEKERJAAN JEMBATAN 2 (BENTANG 9 M)


A. PEKERJAAN PERSIAPAN DAN PEMBONGKARAN
1 Pek. Pembongkaran abutment lama abudmen 2 2.00 0.50 0.80 0.80
abudmen 3 2.00 0.50 0.80 0.80
1.60

B PEKERJAAN REHABILITASI ABUTMENT LAMA


1 Pek. Pas. Batu gunung, camp. 1PC : 3 Psr Abutment 2 2.00 0.40 0.20 0.16
Abutment 3 2.00 0.40 0.20 0.16
0.32

2 Pek. Plesteran camp. 1PC : 2 Psr abudmen 1 2.80 0.40 0.80 0.90
abudmen 4 2.80 0.40 0.80 0.90
1.79

3 Pek. Acian semen abudmen 1 2.80 0.40 0.80 0.90


abudmen 4 2.80 0.40 0.80 0.90
1.79

C PEKERJAAN ABUTMENT BARU


1 Pek. Batu kosong abutment 2 2.00 1.00 0.20 0.40
0.40
2 Pek. Pas. Batu gunung, camp. 1PC : 3 Psr abutment 2 2.00 0.60 0.80 0.96
2.00 1.00 0.30 0.60
1.56

3 Pek. Plesteran camp. 1PC : 2 Psr abutment 2 5.20 0.80 4.16


4.16

4 Pek. Acian semen abutment 2 5.20 0.80 4.16


4.16

D PEKERJAAN BETON
1 Pek. Beton alas gelagar baja
a. Pek. Bekisting abutment 2 4.80 0.40 0.30 0.58
0.58

b. Pek. Pembesian abutment 2


besi 12 16.80 16.80 0.888 14.92 berat besi 12 = 0.888
besi 8 0.72 14.33 10.32 0.395 0.28 berat besi 8 = 0.395
15.20

c. Pek. Balok beton 40/30 cm, camp. 1 : 2 : 3 abutment 2 2.00 0.40 0.30 0.24
0.24

#REF! ###
#REF! ### 18.00 21.33 383.99 Besi WF 200x100x55x8

#REF! ### 8.00 14.00 112.00 Besi WF 200x100x55x8

#REF! ### 56.00 56.00 1. pertemuan antara


baja gelagar dan baja tiang
2. pertemuan antara tiang
#REF! ### gelagar dan railing kayu besi

#REF! ###
#REF! ### 9.00 2.00 0.06 1.08
0.11 10 %
1.19

#REF! ### 9.00 0.14 4.00 0.06 0.30


0.03 10 %
0.33
#REF! ###
#REF! ### 9.00 0.40 3.60

#REF! ### 9.00 2.00 18.00

E PEKERJAAN LANTAI
1 Pek. Rabat alas lantai 1 : 2 : 3 3.10 2.20 0.05 0.34

2 Pek. Tegel Keramik 40 x 40 cm anti slip lantai smpg jmbtn 3.10 2.20 6.82
lantai jembtn 9.00 2.00 18.00
2.48 10 %
27.30

F PEKERJAAN LAIN-LAIN
1 Pekerjaan Pembersihan sisa-sisa material

VI PEKERJAAN JALAN SETAPAK


A. PEKERJAAN PERSIAPAN
1 Pek. Pembersihan dan perataan Lokasi 69.10 1.60 110.56
2 Pek. Pembongkaran akar dan pohon 1.00 1.00
3 Pengukuran dan pemasangan bouvlank 69.10 69.10

B. PEKERJAAN TANAH DAN PASIR


1 Pek. Galian Tanah Pondasi 62.10 0.25 0.25 2.00 7.76
7.00 0.25 0.25 2.00 0.88
7.00 1.60 0.25 1.00 2.80
11.44
1.14
12.58

2 Pek. Urugan Tanah 62.10 0.20 0.10 2.00 2.48


0.25
2.73

4 Pek. Lapisan sirtu 62.10 1.20 0.10 7.45


0.75
8.20

D PEKERJAAN BETON
1 Pek. Pondasi beton, camp. 1 : 2 : 3 62.10 0.20 0.20 2.48

2 Pek. Beton jalan penyeberangan kali camp. 1 : 2 : 3 beton lebar 50 cm 1.60 0.50 0.15 8.00 0.96
beton lebar 37 cm 1.60 0.37 0.15 8.00 0.71
1.67

3 Pek. Beton alas Tangga camp. 1 : 2 : 3 52.10 1.60 0.15 12.50

4 Pek. Rabat beton alas lantai camp. 1 : 2 : 3 10.00 1.20 0.05 0.60

E PEKERJAAN LANTAI
1 Pek. Tegel Keramik 40 x 40 cm anti slip 14.60 1.60 23.36
Ramp. 51.10 0.80 40.88
Tangga 0.80 0.40 129.00 41.28
anak tangga 0.80 0.20 130.00 20.80
126.32
12.63 10 %
138.95
SKETSA GAMBAR

11
PERHITUNGAN VOLUME

PERHITUNGAN VOLUME BESI

NO. URAIAN PEKERJAAN jarak beugel / Kuantitas


struktur Type besi Panjang Kuantitas Volume (m1) per batang
jarak besi dak titik besi

1 2 3 4 5 6 7 8 9 10
1 #REF!

#REF! besi 12 #REF! 4.00 #REF! 12.00


besi 8 (beugel) 0.55 0.15 #REF! #REF! 12.00

2 #REF!

#REF! besi 12 15.00 6.00 90.00 12.00


besi 8 (beugel) 0.65 0.15 101.00 65.65 12.00

3 #REF!
a #REF! besi 10 #REF! 4.00 #REF! 12.00
besi 8 (beugel) 0.55 0.15 #REF! #REF! 12.00

4 #REF!
#REF! Besi 8 7.20 0.15 35.67 2.00 513.60 12.00
5.20 0.15 49.00 2.00 509.60 12.00

PEKERJAAN JEMBATAN 1 (BENTANG 12,3 M)


Pek. Lantai Plat beton. T. 10 cm Besi 10 12.30 0.15 14.33 2.00 352.60 12.00
2.00 0.15 83.00 2.00 332.00 12.00

PEKERJAAN JEMBATAN 2 (BENTANG 9 M)


Pek. Lantai Plat beton. T. 10 cm Besi 10 9.00 0.15 14.33 2.00 258.00 12.00
2.00 0.15 61.00 2.00 244.00 12.00

Plat beton bertulang septiktank Besi 10 1.90 0.15 13.00 2.00 49.40 12.00
1.80 0.15 13.67 2.00 49.20 12.00

REKAPITULASI
BESI 14
BESI 12
BESI 10
BESI 8
BESI 6
KETERANGAN

jumlah berat
jumlah (batang) berat besi /m1
(kg)

11 12 13 14

#REF! 0.888 #REF!


#REF! 0.395 #REF!

#REF!

7.50 0.888 79.92


5.47 0.395 25.93

105.85

#REF! 0.617 #REF!


#REF! 0.395 #REF!

#REF!

42.80 0.395 202.87


42.47 0.395 201.29

85.27
404.16

29.38 0.617 217.55


27.67 0.617 204.84

57.05
422.40

21.50 0.617 159.19


20.33 0.617 150.55

41.83
309.73

4.12 0.617 30.48


4.10 0.617 30.36

8.22
60.84

REKAPITULASI
0.00 BATANG
0.00 BATANG
#VALUE! BATANG
#VALUE! BATANG
#VALUE! BATANG
1.00 0.20 0.40 12.50

10 mm besi utama 4.00 50.00 1.580 79.00

6 mm beugel 12.50 0.20 1.06 66.25 0.680 45.05

0.16 0.16 0.37 0.37 124.05

0.20 0.20 0.40 0.40 dimensi

0.04 0.04 0.03 0.03 over besi 136.455 kg


0.222 0.395 0.617 0.888 1.120 1.580 2.223 2.985 3.853

6 8 10 12 14 16 19 22 25

BESI 14 =

BESI 12 =

BESI 10 =

BESI 8 =

BESI 6 =
DATA PERENCANAAN
NO PAKET KONTRAK PPH 10%
I AIR TERJUN MORAMO
1 jalan setapak 24,000,000.00 2,400,000.00
2 toilet dan ruang ganti 9,000,000.00 900,000.00

II DESA WISATA NAMU


1 jalan internal 700 m2 15,960,000.00 1,596,000.00
2 papan petunjuk arah 5,022,000.00 502,200.00
3 toilet 4 unit 7,600,000.00 760,000.00
4 hiker's shelter 2 unit 3,000,000.00 300,000.00
5 toilet komunal 4 unit 2 lokasi 4,000,000.00 400,000.00
6 papan pusat informasi di kawasan dermaga 2 unit 7,000,000.00 700,000.00

DINAS KETAHANAN PANGAN


1 parkir mobil 1,800,000.00 180,000.00
2 talud 3,600,000.00 360,000.00

III AULA KECAMATAN ANDOOLO 6,480,000.00 648,000.00

IV TOILET KAWASAN PKL 3,000,000.00 300,000.00

90,462,000.00 9,046,200.00
NILAI

21,600,000.00 600,000,000.00 0.04 24,000,000.00


8,100,000.00 200,000,000.00 0.04 8,000,000.00

14,364,000.00 399,000,000.00 0.04 15,960,000.00


4,519,800.00 125,550,000.00 0.04 5,022,000.00
6,840,000.00 190,000,000.00 0.04 7,600,000.00
2,700,000.00 75,000,000.00 0.04 3,000,000.00
3,600,000.00 100,000,000.00 0.04 4,000,000.00
6,300,000.00 175,000,000.00 0.04 7,000,000.00

1,620,000.00 45,000,000.00 0.04 1,800,000.00


3,240,000.00 90,000,000.00 0.04 3,600,000.00

5,832,000.00 162,000,000.00 0.04 6,480,000.00

2,700,000.00 75,000,000.00 0.04 3,000,000.00

81,415,800.00 0.2 16,283,160.00 7,900,000.00


0.3 24,424,740.00
0.5 40,707,900.00
81,415,800.00
24,183,160.00

Anda mungkin juga menyukai