X. YUDHO PRASOJO
DAFTAR KUANTITAS DAN HARGA
A PEKERJAAN PENDAHULUAN
1 Pengukuran & Pemasangan Bouwplank Ls 1.00 2,750,000.00 2,750,000.00
2 Pemasangan papan nama proyek Ls 1.00 500,000.00 500,000.00
Jumlah A 3,250,000.00
B PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi Batu Gunung m3 5.74 88,807.95 509,757.63
2 Pek. Urugan Tanah Kembali m3 14.24 39,562.57 563,371.02
3 Pek. Urugan Pasir Alas Pondasi m3 7.70 255,326.94 1,966,017.44
4 Pek. Urugan Pasir Bawah Lantai, t=13 cm m3 13.39 255,326.94 3,418,827.73
5 Pek. Lantai kerja, t=7 cm m3 7.21 1,192,856.79 8,600,497.45
Jumlah B 15,058,471.26
C PEKERJAAN STRUKTUR
I
1 Pek. Tiang pancang Ulin 10x10x200 cm Ttk 66.00 182,696.96 12,057,999.11
2 Pek. Sunduk Balok Ulin 5/10 cm Bh 33.00 57,806.73 1,907,622.21
3 Pek. Kalang Papan Ulin 2x10 cm m3 0.53 4,848,254.14 2,569,574.69
4 Pek. Anstamping Batu Gunung m3 11.54 609,359.10 7,032,003.99
5 Pek. Pondasi Batu Gunung m3 38.74 1,026,256.18 39,757,164.26
Jumlah C 63,324,364.25
D PEKERJAAN BETON
1 Pek. Sloof beton (15/20) 1.00
- Bekisting m2 43.20 250,311.20 10,813,444.03
- Pembesian Kg 590.65 27,471.55 16,226,070.77
- Beton (Mutu Fc = 14.5 Mpa) m3 3.24 1,276,126.21 4,134,648.93
2 Pek. Kolom beton (15/15) 1.00
- Bekisting m2 116.16 250,311.20 29,076,149.51
- Pembesian Kg 999.48 27,471.55 27,457,264.39
- Beton (Mutu Fc = 14.5 Mpa) m3 4.36 1,276,126.21 5,563,910.28
3 Pek. Balok (15/20), TOC2,95/TOB2,75 1.00
- Bekisting m2 43.20 250,311.20 10,813,444.03
- Pembesian Kg 590.65 27,471.55 16,226,070.77
- Beton (Mutu Fc = 14.5 Mpa) m3 3.24 1,276,126.21 4,134,648.93
4 Pek. Balok (15/15), TOC3,55/TOB3,40 1.00
- Bekisting m2 8.40 250,311.20 2,102,614.12
- Pembesian Kg 146.35 27,471.55 4,020,461.28
- Beton (Mutu Fc = 14.5 Mpa) m3 0.63 1,276,126.21 803,959.51
5 Pek. RingBalk (15/20) 1.00
- Bekisting m2 43.20 250,311.20 10,813,444.03
- Pembesian Kg 590.65 27,471.55 16,226,070.77
- Beton (Mutu Fc = 14.5 Mpa) m3 3.24 1,276,126.21 4,134,648.93
6 Pek. Dak Beton 1.00
- Bekisting m2 29.32 250,311.20 7,339,124.51
- Pembesian Kg 289.82 27,471.55 7,961,804.51
- Beton (Mutu Fc = 14.5 Mpa) m3 2.05 1,276,126.21 2,616,058.73
7 Rabatan Dibawah Lantai t=10 cm (Mutu Fc = 14.5 Mpa) m3 4.64 1,276,126.21 5,921,225.62
Jumlah D 186,385,063.67
E PEKERJAAN ARSITEKTUR
E.I PEKERJAAN DINDING 1.00
1 Pas. Dinding 1/2 Bata 1 Pc 4 Psr m2 312.14 202,541.66 63,221,353.13
2 Pek. Pas. Plesteran 1 Pc 4 Psr m2 551.38 71,254.05 39,288,060.34
3 Pek. Acian m2 551.38 42,041.93 23,181,081.57
4 Pek. Dinding keramik 25 x 40 cm m2 18.00 1,249,024.92 22,482,448.56
E.II PEKERJAAN PLAFOND 1.00
1 Pek. Plafond gypsum bord 9 mm m2 94.50 52,708.76 4,980,977.97
2 Rangka Hollow m2 94.50 270,660.74 25,577,440.16
3 Pek. List plafond gypsum m1 118.00 24,565.66 2,898,748.12
E.III PEKERJAAN LANTAI 1.00
1 Pek. Lantai keramik 40 x 40 cm m2 92.50 309,056.73 28,587,747.85
2 Pek. Lantai keramik 30 x 30 cm m2 6.00 241,734.75 1,450,408.52
3 Pek. Lantai keramik 25 x 25 cm m2 4.50 307,997.15 1,385,987.18
E.IV PEKERJAAN KUSEN DAN PINTU 1.00
1 Pek. Daun pintu dan jendela kaca, Kayu Kelas 1, P1 1.00
- Kusen m1 15.20 390,004.39 5,928,066.77
- Daun Pintu Panil m2 4.40 431,770.71 1,899,791.14
- Pemasangan Kaca m2 0.80 263,410.22 210,728.18
2 Pek. Daun pintu dan jendela kaca, Kayu Kelas 1, P2 1.00
- Kusen m1 42.00 390,004.39 16,380,184.49
- Daun Pintu Panil m2 11.88 431,770.71 5,129,436.07
- Pemasangan Kaca m2 2.16 263,410.22 568,966.08
3 Pek. Daun pintu Panel P3 1.00
- Kusen m1 10.80 390,004.39 4,212,047.44
- Daun Pintu Panil m2 2.80 431,770.71 1,208,958.00
4 Pek. Jendela kaca, Kayu Kelas 1, J1 1.00
- Kusen m1 115.20 390,004.39 44,928,506.02
- Daun Jendela kaca m2 19.20 475,800.00 9,135,360.00
5 Pek. Ventilasi kaca, Kayu Kelas 1, V1 1.00
- Kusen m1 6.80 390,004.39 2,652,029.87
- Daun Jendela kaca m2 0.72 475,800.00 342,576.00
E.V PEKERJAAN KUNCI DAN PENGGANTUNG 1.00
1 Engsel pintu ss bh 36.00 34,500.00 1,242,000.00
2 Handle double swing bh 4.00 124,700.00 498,800.00
3 Handle single bh 6.00 85,600.00 513,600.00
4 Engsel Jendela bh 56.00 28,250.00 1,582,000.00
5 kunci slot bh 28.00 32,250.00 903,000.00
6 kunci tanam kamar mandi bh 2.00 99,475.00 198,950.00
E.VI PEKERJAAN SANITAIR 1.00
1 Pek. Pas. Kloset duduk unit 2.00 1,632,022.23 3,264,044.46
2 Pek. Pas. Hand shower unit 2.00 1,142,062.60 2,284,125.19
3 Pek. Pas. Jet washer unit 2.00 446,164.00 892,328.00
4 Pek. Pas. Krant air bh 4.00 44,369.49 177,477.96
5 Pek. Pas. Floor drain bh 2.00 98,529.09 197,058.18
6 Pas. Pipa PVC 2 Saluran Air Bersih m1 53.15 34,462.49 1,831,681.56
7 Pas. Pipa PVC 4 Saluran Air Kotor m1 23.30 73,593.89 1,714,737.73
E.VII PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 1.00
1 Pek. Rangka atap baja ringan m2 134.52 254,466.53 34,230,837.16
2 Pek. Penutup Atap Genteng Metal m2 192.81 155,299.39 29,943,274.61
3 Pek. Bubungan Atap Genteng Metal m1 23.10 304,113.41 7,025,019.86
4 Pek. Listplank kayu 2/20 m1 46.20 83,492.73 3,857,364.11
E.VIII PEKERJAAN INSTALASI LISTRIK 1.00
1 Titik Instalasi Penerangan & Stop Kontak Bh 16.00 168,400.00 2,694,400.00
2 Fitting Lampu Bh 16.00 8,650.00 138,400.00
3 Pasang Box Panel + MCB 3 Group,1 spare Bh 2.00 360,608.56 721,217.11
4 Lampu DL 10 Watt Bh 6.00 161,974.96 971,849.74
5 Lampu DL 20 Watt Bh 10.00 180,923.56 1,809,235.56
6 Saklar Ganda Bh 6.00 115,039.06 690,234.34
7 Saklar Tunggal Bh 4.00 110,683.06 442,732.22
8 Stop Kontak + Instalasi Bh 10.00 170,088.01 1,700,880.06
Jumlah E 405,176,151.31
F JUMLAH TOTAL (A+B+C+D+E) 673,194,050.49
G PAJAK PPN 67,319,405.05
H JUMLAH KESELURUHAN (F+G) 740,513,455.54
I PEMBULATAN 740,513,000.00
Terbilang :
TUJUH RATUS EMPAT PULUH JUTA LIMA RATUS TIGA BELAS RIBU RUPIAH
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Membuat Beton Mutu F'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 103,620.00 170,973.00
2 Tukang OH 0.2750 110,880.00 30,492.00
3 Kepala Tukang OH 0.0280 114,180.00 3,197.04
4 Mandor OH 0.0830 120,780.00 10,024.74
Jumlah Tenaga Kerja 214,686.78
B. BAHAN
1 Semen Portland (PC) Kg 247.000 1,248.72 308,433.84
2 Pasir Beton (PB) M3 0.621 412,500.00 256,044.64
3 Kerikil (KR) M3 0.740 412,500.00 305,250.00
Jumlah Bahan 869,728.48
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,084,415.26
E Overhead & Profit 10% X D 108,441.53
F Harga Satuan Pekerjaan ( D + E ) 1,192,856.79
Jenis Pekerjaan : Membuat Beton Mutu F'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, W/c = 0,78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.650 103,620.00 170,973.00
2 Tukang OH 0.275 110,880.00 30,492.00
3 Kepala Tukang OH 0.028 114,180.00 3,197.04
4 Mandor OH 0.083 120,780.00 10,024.74
Jumlah Tenaga Kerja 214,686.78
B. BAHAN
1 Semen Portland (PC) Kg 276.000 1,248.72 344,646.72
2 Pasir Beton (PB) M3 0.591 412,500.00 243,964.29
3 Kerikil (KR) M3 0.750 412,500.00 309,222.22
Jumlah Bahan 897,833.23
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,112,520.01
E Overhead & Profit 10% X D 111,252.00
F Harga Satuan Pekerjaan ( D + E ) 1,223,772.01
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 103,620.00 170,973.00
2 Tukang OH 0.2750 110,880.00 30,492.00
3 Kepala Tukang OH 0.0280 114,180.00 3,197.04
4 Mandor OH 0.0830 120,780.00 10,024.74
Jumlah Tenaga Kerja 214,686.78
B. BAHAN
1 Semen Portland (PC) Kg 326.00 1,248.72 407,082.72
2 Pasir Beton (PB) M3 0.543 412,500.00 223,928.57
3 Kerikil (KR) M3 0.762 412,500.00 314,416.67
Jumlah Bahan 945,427.96
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,160,114.74
E Overhead & Profit 10% X D 116,011.47
F Harga Satuan Pekerjaan ( D + E ) 1,276,126.21
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 103,620.00 170,973.00
2 Tukang OH 0.2750 110,880.00 30,492.00
3 Kepala Tukang OH 0.0280 114,180.00 3,197.04
4 Mandor OH 0.0830 120,780.00 10,024.74
Jumlah Tenaga Kerja 214,686.78
B. BAHAN
1 Semen Portland (PC) Kg 326.00 1,248.72 407,082.72
2 Pasir Beton (PB) M3 0.543 412,500.00 223,928.57
3 Kerikil (KR) M3 0.762 412,500.00 314,416.67
Jumlah Bahan 945,427.96
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,160,114.74
E Overhead & Profit 10% X D 116,011.47
F Harga Satuan Pekerjaan ( D + E ) 1,276,126.21
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 103,620.00 170,973.00
2 Tukang OH 0.2750 110,880.00 30,492.00
3 Kepala Tukang OH 0.0280 114,180.00 3,197.04
4 Mandor OH 0.0830 120,780.00 10,024.74
Jumlah Tenaga Kerja 214,686.78
B. BAHAN
1 Semen Portland (PC) Kg 371.00 1,248.72 463,275.12
2 Pasir Beton (PB) M3 0.499 412,500.00 205,660.71
3 Kerikil (KR) M3 0.776 412,500.00 319,916.67
Jumlah Bahan 988,852.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,203,539.28
E Overhead & Profit 10% X D 120,353.93
F Harga Satuan Pekerjaan ( D + E ) 1,323,893.21
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 103,620.00 170,973.00
2 Tukang OH 0.2750 110,880.00 30,492.00
3 Kepala Tukang OH 0.0280 114,180.00 3,197.04
4 Mandor OH 0.0830 120,780.00 10,024.74
Jumlah Tenaga Kerja 214,686.78
B. BAHAN
1 Semen Portland (PC) Kg 384.00 1,248.72 479,508.48
2 Pasir Beton (PB) M3 0.494 412,500.00 203,892.86
3 Kerikil (KR) M3 0.770 412,500.00 317,472.22
Jumlah Bahan 1,000,873.56
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,215,560.34
E Overhead & Profit 10% X D 121,556.03
F Harga Satuan Pekerjaan ( D + E ) 1,337,116.37
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 103,620.00 170,973.00
2 Tukang OH 0.2750 110,880.00 30,492.00
3 Kepala Tukang OH 0.0280 114,180.00 3,197.04
4 Mandor OH 0.0830 120,780.00 10,024.74
Jumlah Tenaga Kerja 214,686.78
B. BAHAN
1 Semen Portland (PC) Kg 406.00 1,248.72 506,980.32
2 Pasir Beton (PB) M3 0.489 412,500.00 201,535.71
3 Kerikil (KR) M3 0.760 412,500.00 313,500.00
Jumlah Bahan 1,022,016.03
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,236,702.81
E Overhead & Profit 10% X D 123,670.28
F Harga Satuan Pekerjaan ( D + E ) 1,360,373.10
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 103,620.00 170,973.00
2 Tukang OH 0.2750 110,880.00 30,492.00
3 Kepala Tukang OH 0.0280 114,180.00 3,197.04
4 Mandor OH 0.0830 120,780.00 10,024.74
Jumlah Tenaga Kerja 214,686.78
B. BAHAN
1 Semen Portland (PC) Kg 413.00 1,248.72 515,721.36
2 Pasir Beton (PB) M3 0.486 412,500.00 200,651.79
3 Kerikil (KR) M3 0.756 412,500.00 311,972.22
Jumlah Bahan 1,028,345.37
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,243,032.15
E Overhead & Profit 10% X D 124,303.21
F Harga Satuan Pekerjaan ( D + E ) 1,367,335.36
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Pengecatan Bidang Kayu Baru (1 x plamir, 1 x cat dasar,2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0700 103,620.00 7,253.40
2 Tukang OH 0.0090 110,880.00 997.92
3 Kepala Tukang OH 0.0060 114,180.00 685.08
4 Mandor OH 0.0030 120,780.00 362.34
Jumlah Tenaga Kerja 9,298.74
B. BAHAN
1 Cat Menie Kg 0.2000 43,890.00 8,778.00
2 Plamir Kayu Kg 0.1500 41,646.00 6,246.90
3 Cat dasar kayu Kg 0.1700 31,020.00 5,273.40
4 Cat kayu penutup Kg 0.2600 196,812.00 51,171.12
5 Kuas Uk 2" - 3" Bh 0.0100 3,960.00 39.60
6 Pengencer/ Minyak cat Liter 0.0300 98,406.00 2,952.18
7 Ampelas Lembar 0.2000 4,752.00 950.40
Jumlah Bahan 75,411.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 84,710.34
E Overhead & Profit 10% X D 8,471.03
F Harga Satuan Pekerjaan ( D + E ) 93,181.37
Jenis Pekerjaan : Pengecatan Tembok/Plafon Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 0.0200 103,620.00 2,072.40
2 Tukang OH 0.0630 110,880.00 6,985.44
3 Kepala Tukang OH 0.0063 114,180.00 719.33
4 Mandor OH 0.0025 120,780.00 301.95
Jumlah Tenaga Kerja 10,079.12
B. BAHAN
1 Plamir Kg 0.1000 39,336.00 3,933.60
2 Cat dasar tembok Kg 0.1000 46,200.00 4,620.00
3 Cat tembok/penutup 2x Kg 0.2600 71,940.00 18,704.40
Jumlah Bahan 27,258.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 37,337.12
E Overhead & Profit 10% X D 3,733.71
F Harga Satuan Pekerjaan ( D + E ) 41,070.84
HARGA BAHAN
Bahan Dinding dan Pondasi
1 Batu
Batu Pecah 14-15 cm m³ 431,508.00
Batu Pecah 5-7 cm m³ 439,098.00
Batu Pecah 3-5 cm m³ 461,802.00
Batu Pecah 2-3 cm m³ 431,508.00
Batu Pecah 1-2 cm m³ 484,506.00
Batu Pecah 0,5-1 cm m³ 469,326.00
Batu Gunung m³ 292,512.00
Batu Padas m³ 295,218.00
Batu Pasang (Bulat) m³ 295,218.00
Batu Kali m³ 290,664.00
Batu Belah m³ 295,218.00
2 Koral/batu split (crusher)
Split Cor (Palu) m³ 412,500.00
Timbunan (Lokal) m³ 98,406.00
3 Pasir
Pasir Pasangan (Lokal) m³ 239,250.00
Pasir Beton (lokal) m³ 258,126.00
Pasir Beton / Cor (Palu) m³ 412,500.00
Pasir Urug (Lokal) m³ 166,518.00
4 Sirtu m³ 286,176.00
5 Kapur Padam m³ 340,692.00
6 Tanah Urug / Timbunan m³ 37,092.00
7 Tanah Liat m³ 98,406.00
8 Batu Bata
Bata Merah Bh 924.00
Batu Bata m³ 924.00
9 Batako Bh 2,112.00
Batako= 12 m2Lubang 3 - 40 x 19 x 8,5 cm K225 Bh 3,960.00
Batako= 12 m2Lubang 3 - 40 x 20 x 10 cm K225 Bh 5,280.00
Batako Lubang 2 - 39 x 19 x 9 cm K225 Bh 5,016.00
10 Beton Cetak (Paving Stone)
Segi(natural)Empat 30 x 30 x 8 cm K 225 = 11/m2 Bh 11,352.00
Segi(full warna)Empat 30 x 30 x 8 cm K 225 = 11/m2 Bh 13,596.00
Segi(natural)Empat 30 x 30 x 8 cm K 400 = 11/m2 Bh 14,388.00
Segi(full warna)Empat 30 x 30 x 8 cm K 400 = 11/m2 Bh 16,632.00
Segi44/m2Empat(natural)21 x 10,5 x 10 cm K 225 = Bh 3,432.00
Segi44/m2Empat(full warna)21 x 10,5 x 10 cm K 225 = Bh 3,960.00
Segi44/m2Empat(natural)21 x 10,5 x 8 cm K 225 = Bh 3,102.00
Segi44/m2Empat(full warna)21 x 10,5 x 8 cm K 225 = Bh 3,432.00
Segi44/m2Empat(natural)21 x 10,5 x 6 cm K 225 = Bh 2,508.00
Segi44/m2Empat(full warna)21 x 10,5 x 6 cm K 225 = Bh 3,234.00
Segi(natural)Enam 24 x 8 cm K 225 = 27/m2 Bh 4,092.00
warna)Segi Enam 24 x 8 cm K 225 = 27/m2 Bh 5,016.00
Segi(natural)Enam 24 x 8 cm K 400 = 27/m2 Bh 5,280.00
warna)Segi Enam 24 x 8 cm K 400 = 27/m2 Bh 6,006.00
Segi(natural)Enam 24 x 6 cm K 225 = 27/m2 Bh 3,828.00
warna)Segi Enam 24 x 6 cm K 225 = 27/m2 Bh 4,422.00
12 Grass Block -
Grass Block 14 x 27,5 x 8 cm K 225 = 9/m Bh 12,870.00
Grass Block 14 x 27,5 x 8 cm K 400 = 9/m Bh 18,150.00
13 Batu Tempel -
Batu Tempel Palimanan 15 x 30 Bh 98,406.00
Batu Tempel Natural MBA Bh 12,144.00
Batu Tempel Hitam (Candi) Bh 75,702.00
Batu Tempel Alur Andersit Bh 128,700.00
Batu Tempel Acak / Lempeng Bh 105,996.00
14 Semen PC 50 kg Zak 62,436.00
Semen PC 50 kg Kg 1,248.72
Semen Putih 40 Kg zak 96,888.00
Semen Putih 40 Kg Kg 2,422.20
Semen Warna Kg 2,640.00
Semen Merah Kg 1,056.00
Semen Abu-abu Kg 1,716.00
15 Beton Ready Mix -
Beton K-175 m³ 1,289,178.00
Beton K-250 m³ 1,804,704.00
Beton K-300 m³ 1,915,254.00
Beton K-350 m³ 1,989,438.00
Beton K-400 m³ 2,062,896.00
Beton K-500 m³ 2,099,988.00
16 Cemical Building -
Rapidrant Gln 295,218.00
Puzzidth - 100 XR Ltr 151,404.00
Storox - 100 Kg 98,406.00
17 Beton 1:2:3 m³ 1,688,148.00
Bahan Besi -
1 Besi Plat -
Besi Plat 12 mm Lbr 2,233,242.00
Besi Plat 10 mm Lbr 1,854,732.00
Besi Plat 8 mm Lbr 1,635,150.00
Besi Plat 6 mm Lbr 1,241,526.00
Besi Plat 5 mm Lbr 946,308.00
Besi Plat 4 mm Lbr 719,202.00
Besi Plat 3 mm Lbr 582,912.00
Besi Plat 2 mm Lbr 378,510.00
Besi Plat 1 mm Lbr 264,990.00
2 Besi Beton Ulir Kg 31,845.00
3 Besi Beton Polos Kg 21,516.00
4 Besi beton Polos -
Besi Beton Ø 6 ( 5,0 ) x 11,0 m Btg 22,704.00
Besi Beton Ø 8 ( 6,4 ) x 11,0 m Btg 41,646.00
Besi Beton Ø 8 ( 7,0 ) x 11,0 m Btg 46,926.00
Besi Beton Ø 8 ( 8,0 ) x 12,0 m Btg 65,868.00
Besi Beton Ø 10 ( 8,2 ) x 11,4 m Btg 68,112.00
Besi Beton Ø 10 ( 8,5 ) x 11,4 m Btg 71,940.00
Besi Beton Ø 10 ( 9,4 ) x 11,4 m Btg 83,292.00
Besi Beton Ø 12 ( 10,4 ) x 11,4 m Btg 90,816.00
Besi Beton Ø 12 ( 10,9 ) x 11,4 m Btg 113,586.00
Besi Beton Ø 14 ( 12,9 ) x 11,5 m Btg 158,994.00
Besi Beton Ø 16 ( 13,9 ) x 10,4 m Btg 166,518.00
Besi Beton Ø 16 ( 14,2 ) x 11,5 m Btg 189,288.00
5 Besi Beton Ulir -
Besi Beton Ø 10 x 12,0 m Btg 90,816.00
Besi Beton D13 x 12,0 m Btg 158,994.00
Besi Beton D16 x 12,0 m Btg 242,220.00
Besi Beton D19 x 12,0 m Btg 333,102.00
Besi Beton D22 x 12,0 m Btg 446,622.00
6 Kawat -
Kawat Ikat Beton / Bendrat Kg 21,186.00
Kawat Nyamuk Beton m 16,632.00
Kawat Nyamuk Alumunium m 21,186.00
Kawat Nyamuk Plastik m 21,978.00
Kawat Duri m 18,150.00
Kawat Harmonika (Lubang Kecil) m 46,926.00
Kawat Harmonika (Lubang Besar) m 32,538.00
Kawat Kasa Ayak 1,5 x 0,5 cm m 33,330.00
Kawat Kasa Ayak 2 x 2 cm m 27,984.00
Kawat Wiremesh M6 Roll 3,284,424.00
Kawat Wiremesh M5 Roll 2,507,010.00
Kawat Wiremesh M8 Roll 5,458,134.00
Kawat Wiremesh M8 lbr 451,902.00
Kawat Wiremesh Kg 14,388.00
Kawat Las Listrik dos 114,312.00
Kawat Burung Btg 31,020.00
7 Teralis Motif / Besi Tempa m² 1,015,938.00
8 Pagar6 mm BRC 120 cm x 240 cm dia. Kawat m 643,500.00
9 Baja Profil Kg 21,186.00
10 Baja WF Kg 10,626.00
11 Baja Strip Kg 9,108.00
12 Glass bit Kawat Beronjong Bh 18,942.00
13 Besi Strip Kg 15,906.00
14 Besi Siku Kg 18,150.00
15 Besi Scuare Tube m 71,940.00
16 Besi Lis Kaca m 62,106.00
17 Alumunium Strip Bh 52,206.00
18 FormiteSpacer/Penjaga Jarak Bekisting m 21,186.00
19 Pintu Besi Baja m 60,588.00
20 Jendela Besi m² 333,102.00
21 Rolling Door Besi m² 257,400.00
22 Rolling Door Alumunium m² 340,692.00
23 Folding Gate m² 333,102.00
24 Sunscreen Alumunium m² 802,428.00
Floordeck m 96,442.50
25 Talang -
Talang 30 cm m 12,144.00
Talang 40 cm m 18,942.00
Talang 45 cm m 22,704.00
Talang 50 cm m 27,258.00
Talang 60 cm m 33,330.00
Talang 90 cm m 49,236.00
26 Besi Angkur dia 8 Kg 5,280.00
27 Besi Profil Kg 6,072.00
28 Pengelasan cm 330.00
Hollow 20x20x1,7 mm m 11,088.00
Hollow 20x40x2 mm m 18,739.05
Hollow 40x40x2 mm m 24,726.90
Hollow 40x60x2 mm m 36,220.80
Profil C. 75 m 3,399.00
Reng U 45 m 2,648.25
Bahan Paku -
1 Paku Kayu 0,5" - 1,5" / 1 - 2,5 cm Kg 29,502.00
2 Paku Kayu 2" - 6" / 5 - 7 cm Kg 29,502.00
3 Paku Beton Kg 26,466.00
4 Paku Ulin 1" Kg 29,502.00
5 Paku Ulin 1,5" - 5" Kg 29,502.00
6 Paku Seng Kg 27,984.00
7 Paku Plywood Kg 29,502.00
8 Paku Sekrup Kg 42,372.00
9 Paku Sekrup 1 - 2,5 cm Bh 5,544.00
10 Paku Asbes Kg 32,538.00
11 Paku Sirap Kg 32,538.00
12 Paku Gypsum Kg 34,848.00
13 Paku Kait Bh 1,650.00
14 Paku Sumbet Bh 990.00
15 Paku Reng Kg 21,186.00
16 Paku Genteng Metal Kg 29,502.00
17 Paku Pancing 60 x 230 Kg 29,502.00
18 Paku Pancing 50 x 231 Kg 32,538.00
19 Paku Hak Panjang 15 cm Kg 34,848.00
20 Paku 12 cm Kg 33,330.00
21 Paku 10 cm Kg 29,502.00
22 Baut Kg 29,502.00
23 Sekrup Fixer Bh 29,502.00
24 Paku Tripleks kg 29,502.00
Bahan Kayu -
1 Ulin -
Balok m³ 3,603,402.00
Papan m³ 3,974,388.00
Papan Siring Pagar kpj 13,596.00
2 Bengkirai -
Balok m³ 2,744,214.00
Papan m³ 3,293,070.00
3 Meranti -
Balok m³ 2,744,214.00
Papan m³ 3,293,070.00
4 Kapur -
Balok m³ 2,744,214.00
Papan m³ 3,293,070.00
5 Kayu KI. I (Jati/Ulin.dll) m³ 3,966,798.00
6 Kayu KI. II (Kamper/Kruing.dll) m³ 3,474,702.00
7 Kayu KI. III m³ 1,960,662.00
8 Papan Kayu KI. I (Jati/Ulin.dll) m³ 4,466,418.00
9 Papan Kayu KI. II (Kamper/Kruing.dll) m³ 3,815,394.00
10 Papan Kayu KI. III m³ 1,779,030.00
Papan Kayu KI. IV m³ 1,733,556.00
11 Papan Bouwplank m³ 1,733,556.00
12 Papan Listplank m³ 3,474,702.00
13 Papan Bekisting m³ 1,779,030.00
14 Kayu Rangka Plafond m³ 2,975,082.00
15 Kayu Rangka Atap m³ 2,725,272.00
16 Kayu Reng 2/3 - 4 m m³ 2,725,272.00
17 Kayu Reng 3/4 - 4 m m³ 2,725,272.00
18 Kayu Gelagar 8/10 - 4 m m³ 3,247,596.00
19 Kayu Bekisting m³ 2,483,052.00
20 Kayu Lumbresiring Btg 42,372.00
21 Kayu Kuda-kuda m³ 3,224,892.00
22 Kayu Kaso 5/7 (meranti) m³ 2,725,272.00
23 Kayu Kaso 5/7 (meranti) Btg 44,682.00
24 Kayu Terentang (meranti) m³ 2,483,052.00
25 Kayu Cetakan m³ 408,804.00
26 List Kayu Profil 5/5 Btg 40,854.00
27 List Kayu Profil 4/4 Btg 40,854.00
28 List Kayu Profil 2/4 m³ 1,415,634.00
29 Dolken Kayu Galam Btg 52,998.00
30 Perancah Kayu m³ 2,079,528.00
31 Alang-alang Ikat 31,020.00
32 Bambu Btg 12,870.00
33 Bilik Bambu m² 136,290.00
34 Tripleks 4mm Lbr 52,470.00
Bahan Lantai -
1 Ubin Tegel Polos 20 x 20 cm m² 57,552.00
2 Ubin Tegel Polos 30 x 30 cm m² 74,184.00
3 Ubin Tegel Polos 40 x 40 cm m² 83,292.00
4 Plint Ubin PC Abu-abu 15 x 20 m² 38,610.00
5 Plint Ubin PC Abu-abu 10 x 30 m² 35,574.00
6 Plint Ubin PC Abu-abu 10 x 40 m² 36,366.00
7 Ubin Tegel Warna 20 x 20 cm m² 57,552.00
8 Ubin Tegel Warna 30 x 30 cm m² 75,702.00
9 Ubin Tegel Warna 40 x 40 cm m² 83,292.00
10 Plint Ubin PC Warna 10 x 20 m² 29,502.00
11 Plint Ubin PC Warna 10 x 30 m² 30,294.00
12 Plint Ubin PC Warna 10 x 40 m² 31,020.00
13 Ubin Teraso 40 x 40 m² 39,336.00
14 Ubin Teraso 30 x 30 m² 31,812.00
15 Plint Ubin Teraso 10 x 30 m² 3,564.00
16 Plint Ubin Teraso 10 x 40 m² 5,280.00
19 Keramik Dinding 25 x 40 cm m² 82,302.00
19 Keramik 20 x 20 cm m² 75,702.00
20 Keramik 25 x 25 cm m² 120,365.52
18 Keramik 30x 30 cm m² 46,200.00
21 Keramik 30 x 30 cm (motif) m² 68,112.00
22 Keramik 30 x 30 cm (biasa) m² 52,206.00
23 Keramik 40 x 40 cm (motif) m² 123,750.00
24 Keramik 40 x 40 cm (biasa) m² 71,148.00
25 Keramik 60x60 cm m² 280,962.00
26 Keramik Artistik 5 x 20 cm m² 29,502.00
27 Keramik Artistik 11 x 11 cm m² 52,206.00
28 Keramik Artistik 10 x 20 cm m² 40,854.00
29 Keramik Artistik 20 x 20 cm m² 56,034.00
30 Plint Keramik 5 x 20 m² 26,466.00
31 Plint Keramik 10 x 10 m² 27,258.00
32 Plint Keramik 10 x 20 m² 32,538.00
33 Plint Keramik 10 x 30 m² 37,092.00
34 Plint Keramik 10 x 40 m² 42,372.00
35 Marmer Biasa m² 635,910.00
36 Marmer 100 x 100 cm Bh 355,806.00
37 Ubin Teralux 30 x 30 cm m² 302,808.00
38 Ubin Teralux 40 x 40 cm m² 325,512.00
39 Plint Teralux 10 x 30 m² 38,610.00
40 Plint Teralux 10 x 40 m² 49,236.00
41 Ubin Teralux Marmer 30 x 30 cm m² 333,102.00
42 Ubin Teralux Marmer 40 x 40 cm m² 340,692.00
43 Ubin Teralux Marmer 60 x 60 cm m² 386,100.00
44 Plint Teralux Marmer 10 x 30 m² 83,292.00
45 Plint Teralux Marmer 10 x 40 m² 105,996.00
46 Plint Teralux Marmer 10 x 60 m² 136,290.00
47 Ubin Porselin Putih Lokal 11 x 11 cm m² 75,702.00
48 Ubin Porselin Putih Lokal 10 x 20 cm m² 56,760.00
49 Ubin Porselin Putih Lokal 20 x 20 cm m² 83,292.00
50 Ubin Porselin Putih Lokal 11 x 11 cm Bh 726.00
51 Ubin Porselin Putih Lokal 10 x 20 cm Bh 1,056.00
52 Ubin Porselin Putih Lokal 20 x 20 cm Bh 1,452.00
53 Ubin Porselin Putih Warna 10 x 20 cm m² 83,292.00
53 Ubin Porselin Putih Warna 20 x 20 cm m² 90,816.00
54 Granite Tile 30 x 30 m² 295,218.00
55 Granite Tile 40 x 40 m² 363,396.00
56 Granite Tile 60 x 60 m² 386,100.00
57 Plint Granite 10 x 30 m² 38,610.00
58 Plint Granite 10 x 40 m² 40,854.00
59 Plint Granite 10 x 60 m² 50,688.00
60 Hollow Block Bh 4,752.00
61 Hollow Block-20 m³ 4,686.00
62 Hollow Block-15 m³ 4,224.00
63 Hollow Block-10 m³ 3,564.00
64 Concrete Block (CB.20) Bh 5,214.00
65 Concrete Block (CB.15) Bh 5,214.00
66 Concrete Block (CB.10) Bh 5,214.00
67 Bondbeam 40 x 20 x 20 cm Bh 5,742.00
68 Roster / Terawang 40 x 40 x 11 Bh 37,884.00
69 Roster / Terawang 24 x 12 x 11 Bh 9,900.00
70 Batu Tela Uk. 20 x 30 x 10 Bh 18,150.00
71 Badkip Bh 885,720.00
72 Karpet m² 136,290.00
73 Underlayer / rubber corrugated m² 166,518.00
74 Parquet m² 166,518.00
75 Gymfloor m² 166,518.00
76 Batu Granite Kg 27,258.00
77 Batu Teraso Kg 21,186.00
78 Vinyl Motif Kembang ex DN Bh 45,408.00
79 Vinyl Wall Covering, lebar 50 cm Bh 64,350.00
80 Floor Hardener Ferrovax Kg 34,848.00
81 Teraso Cor m³ 529,914.00
82 Internal Cove Bh 30,294.00
83 Lem Kg 12,870.00
84 Bata Pelapis Bh 529.98
Bahan Atap -
1 Sirap lbr/ikatKayu Ulin Uk. 5 x 80 x 500 mm = 80 Ikat 149,886.00
2 Genteng Metal -
Multi Roof Lbr 90,816.00
Surya Roof Lbr 83,292.00
Sakura Roof Lbr 54,516.00
Multi Color Lbr 78,738.00
3 Nok Genteng Metal -
Nok Raja Bh 68,112.00
Nok Ratu Bh 36,366.00
Nok Putri Bh 33,330.00
4 Genteng Beton -
Genteng Beton Bh 7,920.00
Nok Genteng Beton Bh 10,626.00
5 Genteng Keramik -
Genteng Keramik Bh 10,626.00
Nok Genteng Keramik Bh 15,114.00
Karpus Genteng Keramik Bh 21,186.00
6 Asbes -
Gelombang Uk. 2,5 x 92 cm Lbr 37,884.00
Gelombang Uk. 2,25 x 92 cm Lbr 37,884.00
Gelombang Uk. 1,0 x 92 cm Lbr 43,164.00
Gelombang Uk. 85 x 115 cm Lbr 32,538.00
Gelombang Uk. 2,00 x 92 cm x 5 mm Lbr 31,020.00
Gelombang Uk. 1,80 x 92 cm x 5 mm Lbr 37,884.00
Gelombang Uk. 3,00 x 1,05 cm x 4 mm Lbr 90,816.00
Gelombang Uk. 2,70 x 1,05 cm x 4 mm Lbr 83,292.00
Gelombang Uk. 2,40 x 1,05 cm x 4 mm Lbr 67,386.00
Gelombang Uk. 2,10 x 1,05 cm x 4 mm Lbr 60,588.00
Gelombang Uk. 1,50 x 1,05 cm x 4 mm Lbr 48,444.00
Gelombang Uk. 3,00 x 1,08 cm x 6 mm Lbr 98,406.00
Gelombang Uk. 2,70 x 1,08 cm x 6 mm Lbr 83,292.00
Gelombang Uk. 2,40 x 1,08 cm x 6 mm Lbr 75,702.00
Gelombang Uk. 2,10 x 1,08 cm x 6 mm Lbr 75,702.00
Gelombang Uk. 1,80 x 1,08 cm x 6 mm Lbr 43,890.00
Bubungan Asbes Lbr 31,812.00
Karpus Asbes Gelombang Besar Lbr 31,020.00
Karpus Asbes Gelombang Kecil Lbr 39,336.00
7 Atap Seng Metal -
Suma TB Roof 180 cm Lbr 41,646.00
Suma TB Roof 210 cm Lbr 46,926.00
Suma TB Roof 240 cm Lbr 52,998.00
Suma TB Roof 300 cm Lbr 58,278.00
8 Atap Seng Gelombang -
BJLS 40 KI Lbr 136,290.00
BJLS 30 KI Lbr 105,996.00
BJLS 27 KI Lbr 83,292.00
BJLS 20 KI Lbr 57,552.00
BJLS 18 KI Lbr 44,682.00
9 Bubungan Stel Gelombang -
Bubungan Stel Gelombang 0,92" Lbr 47,718.00
Bubungan Stel Gelombang 1,05" Lbr 48,444.00
Bubungan Stel Gelombang 1,08" Lbr 49,236.00
10 Nok -
Nok Stel Gelombang 1,05" Bh 24,222.00
Nok Stel Gelombang 1,08" Bh 27,984.00
Nok Paten 0,92" Bh 26,466.00
Nok Paten 1,05" Bh 34,848.00
Nok Paten 1,08" Bh 23,496.00
Nok Stel Rata 0,92" Bh 24,222.00
Nok Stel Rata 1,05" Bh 24,222.00
Nok Standar 40 cm, swg 22 Bh 24,222.00
11 Genteng Kaca Bh 14,388.00
12 Genteng Palentong Bh 6,534.00
13 Genteng Kodok Bh 5,808.00
14 Genteng Bubung Bh 8,316.00
15 Genteng Palentong "S" Bh 7,590.00
16 Bubungan Genteng Palentong "S" Bh 5,478.00
17 Roof Light Fiber Glass 180 x 90 m Lbr 63,558.00
18 Seng Gelombang Lbr 44,682.00
19 Seng Plastik Lbr 54,516.00
20 Atap Daun Lbr 3,630.00
21 Atap Alumunium Gelombang Lbr 40,854.00
22 Ijuk Kg 26,466.00
23 Alumunium Foil -
Alumunium Foil 70 m double sheet Glng 1,082,532.00
Alumunium Foil 70 m single sheet Glng 863,016.00
Alumunium Foil 70 m single sheet m² 21,186.00
Alumunium 0,55 mm Lbr 310,398.00
24 Seng Plat Lbr 52,206.00
Bahan Langit - Langit -
1 Plywood -
Plywood 3 mm Lbr 43,692.00
Plywood 4 mm Lbr 52,470.00
Plywood 6 mm Lbr 68,838.00
Plywood 9 mm Lbr 105,270.00
Plywood 12 mm Lbr 147,048.00
Plywood 18 mm Lbr 196,812.00
2 Jabarwood -
Jabarwood Bergaris Lbr 181,698.00
Jabarwood Polos Lbr 83,292.00
3 Kalsiboard -
Kalsiboard 4 mm Lbr 74,184.00
Kalsiboard 6 mm Lbr 128,700.00
Kalsiboard 9 mm Lbr 174,108.00
Kalsiboard 12 mm Lbr 234,696.00
Formika 4' x 3' Lbr 219,516.00
4 Gipsum -
Gipsum 9 mm Lbr 74,184.00
Gipsum 12 mm Lbr 90,816.00
List Gipsum m 9,834.00
5 GRC Board -
GRC 9 mm Lbr 264,990.00
GRC 12 mm Lbr 378,510.00
6 Akustik Amstrong -
Akustik Amstrong 30 x 30 cm Lbr 65,076.00
Akustik Amstrong 30 x 60 cm Lbr 116,556.00
Akustik Amstrong 60 x 120 cm Lbr 378,510.00
7 Taekwood Lbr 91,608.00
8 Soft Board 4' x 8' x 4 mm Lbr 211,992.00
9 Profil Alumunium, "T" m 66,594.00
10 Ramset / Dyna Bolt Bh 233,178.00
11 Kawat Seng Polos Kg 24,222.00
12 Seng Rata / Plat -
BJLS 40 KI Lbr 128,700.00
BJLS 30 KI Lbr 105,996.00
BJLS 27 KI Lbr 65,076.00
BJLS 20 KI Lbr 52,206.00
13 Plat Asbes -
Plat Asbes Tebal 6 mm Lbr 98,406.00
Plat Asbes Tebal 5 mm Lbr 83,292.00
Plat Asbes Tebal 4 mm Lbr 65,076.00
14 Asbes Semen m² 35,574.00
15 Eternit Uk. 100 x 100 Lbr 53,724.00
Bahan Kaca -
1 Kaca Bening 3 mm m² 128,700.00
2 Kaca Bening 5 mm m² 198,726.00
3 Kaca Bening 8 mm m² 219,384.00
4 Kaca Ryben 3 mm m² 136,290.00
5 Kaca Ryben 5 mm m² 336,996.00
6 Kaca Ryben 8 mm m² 329,076.00
7 Kaca Ryben 12 mm m² 764,610.00
8 Kaca Nako 5 mm Set 209,022.00
Kaca Nako 5 mm m² 181,698.00
9 Kaca Cermin 5 mm m² 295,218.00
10 Kaca Cermin 6 mm m² 348,216.00
11 Kaca Cermin 8 mm m² 408,804.00
12 Kaca Stopsol m² 446,622.00
13 Kaca Nako Antik m² 249,810.00
14 Kaca Wireglass 5 mm m² 779,724.00
15 Kaca Patri Ukir Warna 5 mm m² 1,226,346.00
16 Profil Kaca Bh 29,502.00
Bahan Penggantung -
1 Engsel 3" Psg 317,922.00
2 Engsel 4" Psg 37,092.00
3 Engsel Plastik / Nylon Bh 16,632.00
4 Engsel Pintu Kipas Bh 46,926.00
5 Engsel Angin Bh 55,242.00
6 Hak Angin Bh 18,942.00
7 Kait Angin Bh 21,186.00
8 Espagnolet Lengkap Bh 29,502.00
9 Grendel Lokal Bh 26,466.00
10 Kunci Tanam Union 1 x Slash Bh 158,994.00
11 Kunci Tanam Union 2 x Slash Bh 257,400.00
12 Kunci Tanam Yale 1 x Slash Bh 68,904.00
13 Kunci Tanam Yale 2 x Slash Bh 83,292.00
14 Kunci Tanam Antik Bh 302,808.00
15 Kunci Tanam Pendek Bh 56,760.00
16 Kunci Tanam Panjang Bh 90,816.00
17 Kunci Tanam Kamar Mandi Bh 189,288.00
18 Kunci Silinder Bh 196,812.00
19 Kunci Lemari Bh 73,458.00
20 Door Closer Bh 211,992.00
21 Kunci Slot Bh 90,816.00
22 Pegangan Pintu (Door Holder) Bh 98,406.00
23 Door Stop Bh 26,466.00
24 Rel Pintu Dorong m² 1,286,934.00
25 Rolling Door Alumunium m² 340,692.00
26 Rolling Door Besi m² 1,514,040.00
27 Pintu Alumunium m² 666,204.00
28 Pintu Folding Gate Besi 0,5 mm Bh 423,918.00
29 Vertikal Blinds Bh 401,214.00
30 Spring Knip Bh 98,406.00
Bahan Pipa -
1 Pipa Besi -
Pipa Besi 1/2" - 4 m Btg 62,832.00
Pipa Besi 1/2" - 6 m Btg 71,148.00
Pipa Besi 3/4" - 4 m Btg 75,702.00
Pipa Besi 1,5" - 4 m Btg 143,814.00
Pipa Besi 2" - 4 m Btg 189,288.00
Pipa Besi 2,5" - 4 m Btg 355,806.00
Pipa Besi 3" - 4 m Btg 401,214.00
Pipa Besi 4" - 4 m Btg 401,214.00
Pipa Paralom 1" - 4 m Btg 33,330.00
Pipa Paralon 1/2" - 4 m Btg 29,502.00
Pipa Paralon 3/4" - 4 m Btg 44,682.00
Pipa Paralon 1,5" - 4 m Btg 46,200.00
Pipa Paralon 2" - 4 m Btg 62,832.00
Pipa Paralon 2,5" - 4 m Btg 90,816.00
Pipa Paralon 3" - 4 m Btg 136,290.00
Pipa Paralon 4" - 4 m Btg 196,812.00
2 Pipa Galvanis -
Pipa Galvanis 1/2" - 6 mm (medium A) Btg 54,516.00
Pipa Galvanis 3/4" - 6 mm (medium A) Btg 65,868.00
Pipa Galvanis 1" - 6 mm (medium A) Btg 98,406.00
Pipa Galvanis 1,5" - 6 mm (medium A) Btg 143,814.00
Pipa Galvanis 2" - 6 mm (medium A) Btg 272,514.00
Pipa Galvanis 3" - 6 mm (medium A) Btg 416,394.00
Pipa Galvanis 4" - 6 mm (medium A) Btg 529,914.00
3 Waterstop -
Waterstop Lebar 150 mm m 219,516.00
Waterstop Lebar 200 mm m 227,106.00
Waterstop Lebar 230 mm m 325,512.00
Waterstop Lebar 250 mm m 363,396.00
Waterstop Lebar 300 mm m 423,918.00
Waterstop Lebar 320 mm m 484,506.00
4 Pipa Tanah Dia. 15 cm Buah 53,724.00
5 Pipa Tanah Dia. 20 cm Buah 83,292.00
6 Pipa PVC -
Pipa PVC 1/2" m 3,828.00
Pipa PVC 3/4" m 5,676.00
Pipa PVC 1" m 7,590.00
Pipa PVC 1,5" m 15,114.00
Pipa PVC 2" m 17,424.00
Pipa PVC 2,5" m 23,496.00
Pipa PVC 3" m 31,812.00
Pipa PVC 4" m 52,998.00
7 Pipa GIP -
Pipa GIP dia. 1" m 11,352.00
Pipa GIP dia. 1 1/2" m 13,596.00
Pipa GIP dia. 2" m 24,222.00
Bahan Sanitair -
1 Kloset Jongkok KIA Bh 295,218.00
2 Kloset Jongkok American Standart Bh 302,808.00
3 Kloset Jongkok (Teraso) Bh 249,810.00
4 Kloset Duduk Komplit Bh 999,240.00
5 Kloset Duduk Putih Bh 847,836.00
6 Kloset Duduk Warna Bh 961,422.00
7 Bak Mandi Fibre (besar) Bh 499,620.00
8 Bak Mandi Porselin (besar) Bh 446,622.00
9 Bak Mandi Plastik (besar) Bh 938,718.00
10 Bak Mandi (Teraso) Bh 325,512.00
11 Urinoir Teraso Bh 734,316.00
12 Bak Cuci Piring Logam Bh 401,214.00
13 Bak Cuci Piring Stainless Steel Bh 666,204.00
14 Bak Cuci Piring Teraso Bh 227,106.00
15 Pompa Air Sanyo (Listrik) Bh 832,722.00
16 Pompa Air Shimizu (Listrik) Bh 499,620.00
17 Pompa Air National (Listrik) Bh 522,324.00
18 Floor Drain Bh 75,702.00
19 Kran Wastafel Bh 181,698.00
20 Kran Bebek Bh 363,396.00
21 Kran Shower Bh 696,432.00
22 Kran Air Bh 26,466.00
23 Kran Tembok Bh 68,112.00
24 Wastafel Lengkap Bh 1,468,632.00
Hand Shower Bh 728,640.00
Jet washer Bh 96,096.00
25 Tandon Air 650 L Bh 938,718.00
26 Tandon Air 1000 L Bh 1,150,644.00
27 Tandon Air 1200 L Bh 1,355,046.00
28 Water Drain + Accessories Bh 408,804.00
29 Sealtape Bh 2,772.00
30 Porselen 11 x 11 Bh 18,150.00
Bahan Gorong - Gorong -
1 Buis Beton 10 cm x 1 m Bh 40,854.00
2 Buis Beton 15 cm x 1 m Bh 44,682.00
3 Buis Beton 20 cm x 1 m Bh 83,292.00
4 Buis Beton 25 cm x 1 m Bh 98,406.00
5 Buis Beton 50 cm x 1 m Bh 227,106.00
6 Buis Beton 100 cm x 1 m Bh 234,696.00
1 Amplas Kayu / Besi Lbr 4,752.00
2 Meni Kayu Kg 43,890.00
3 Meni Besi Kg 44,682.00
4 Dampul Kayu Kg 36,366.00
5 Plamir Tembok Kg 39,336.00
6 Plamir Kayu Kg 41,646.00
7 Tiner A Spesial Ltr 98,406.00
8 Tiner B Spesial Ltr 50,688.00
9 Tiner A Biasa Ltr 25,014.00
10 Cat Dasar Tembok Kg 46,200.00
11 Cat Dasar Kayu Kg 31,020.00
12 Cat Dasar Besi Kg 41,646.00
13 Cat Tembok Paragon 5 kg Kg 71,940.00
14 Cat Mowilex Interior Ltr 60,588.00
15 Cat Mowilex Eksterior Ltr 83,292.00
16 Undercoat Mowilex Ltr 98,406.00
17 Cat Dulux Interior Ltr 113,586.00
18 Cat Duluk Eksterior Ltr 196,812.00
19 Alkali Primer Ltr 48,444.00
20 Alkali Killer Ltr 60,588.00
21 Wood Filler (Dampul Melamin) Ltr 41,646.00
22 Wood Stand Ltr 62,832.00
23 Sanding Ltr 43,890.00
24 Clear Doop Ltr 62,832.00
25 Flincote Kg 36,366.00
26 Vernis Ltr 53,724.00
27 Teak Oil Ltr 31,020.00
28 Water Profing Kg 52,206.00
29 Lem Kayu Kg 36,366.00
30 Lem Vinyl Kg 36,366.00
31 Lem Aibon Kg 52,206.00
32 Sealent bh 31,020.00
33 Formika Lbr 249,810.00
34 Vinyl Karet 30 x 30 kwl Bh 31,656.24
35 Vinyl Karet 15 x 30 kwl Bh 24,773.76
36 Wallpaper m² 71,148.00
37 Perekat Wallpaper Kg 9,108.00
38 Minyak Bekisting Ltr 3,036.00
39 Residu Ltr 26,466.00
40 Aspal Drum 33,330.00
41 Soda Api Kg 21,186.00
42 Kapur Tembok Klg 15,906.00
43 Pembersih Lantai Ltr 26,466.00
44 Air Ltr 66.00
45 Kapur Sirih Kg 27,258.00
46 Kalkarium Kg 60,588.00
47 Tepung Gypsum Kg 9,108.00
48 Politur Ltr 55,242.00
49 Politur Jadi Ltr 53,724.00
50 Solar Ltr 5,280.00
51 Minyak Pelumas Ltr 49,236.00
52 Tali Ijuk Kg 26,466.00
53 Sabun Kg 46,200.00
54 Cat Penutup Kg 39,336.00
55 Kuas Bh 3,960.00
56 Pompa Tangan Bh 832,722.00
57 Instalasi Listrik Titik 105,996.00
Bahan Listrik -
1 Instalasi Kabel NYY 2,5mm m 5,758.50
2 Pasang Lampu 20 watt + Instalasi Bh 93,192.00
3 Stop Kontak +Instalasi Bh 93,192.00
4 Stop Kontak Tunggal Bh 34,518.00
5 Stop Kontak Double Bh 39,204.00
6 Stop Kontak Triple Bh 65,142.00
7 Sakelar Tunggal Bh 10,395.00
8 Sakelar Double Bh 14,355.00
9 Kabel Listrik NYA 1.5 mm 157,212.00
10 Kabel Listrik NYA 2.5 mm M' 3,283.50
11 Kabel Listrik NYA 4 mm 392,964.00
12 Kabel Listrik NYMHY 3 X 2.5 mm 773,388.00
13 Sakering Kas Lokal 1 Group 103,752.00
14 Sakering Kas Lokal 2 Group 190,146.00
15 Sakering Kas Lokal 3 Group Bh 45,474.00
16 Pipa Listrik Besi 20,460.00
17 Pipa Listrik Plastik Btg 7,920.00
18 Fitting Bh 6,996.00
19 T-Doos/Cabang Bh 3,630.00
20 Klemp Bh 11,814.00
21 Zekering Box 3 fase Bh 58,146.00
22 Zekering Box 1 fase Bh 31,416.00
23 Lampu 5 watt Bh 22,704.00
24 Lampu 8 watt Bh 30,294.00
25 Lampu 10 watt Bh 32,010.00
26 Lampu 15 watt Bh 38,742.00
27 Lampu 18 watt Bh 40,392.00
28 Lampu LED 20 watt Bh 46,332.00
29 Lampu DL 10 Watt bh 57,024.00
30 Lampu DL 20 Watt bh 74,250.00
31 Pondasi Tiang octogonal cabang 2 h = 9m bh 603,900.00
32 Pondasi Tiang octogonal cabang 3 h=9m bh 660,000.00
33 Pondasi Tiang octogonal cabang 3 h=11m bh 726,000.00
34 Lampu jalan / SRP 822/250 Watt Son bh 115,500.00
35 Penyambungan beban ls 33,000.00
36 Alat bantu set 9,900.00
37 Box Panel+MCB 3 Group bh 237,600.00
KETERANGAN :
Harga Belum ternasuk PPN
TIME SCHEDULE
WAKTU PELAKSANAAN
No URAIAN PEKERJAAN JUMLAH (Rp) BOBOT BULAN I BULAN II Ket
%
I II III IV I II III
A PEKERJAAN PENDAHULUAN
1 Pengukuran & Pemasangan Bouwplank 2,750,000.00 0.41 0.41
2 Pemasangan papan nama proyek 500,000.00 0.07 0.07
B PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi Batu Gunung 509,757.63 0.08 0.08
2 Pek. Urugan Tanah Kembali 563,371.02 0.08 0.08
3 Pek. Urugan Pasir Alas Pondasi 1,966,017.44 0.29 0.29
4 Pek. Urugan Pasir Bawah Lantai, t=13 cm 3,418,827.73 0.51 0.51
5 Pek. Lantai kerja, t=7 cm 8,600,497.45 1.28 1.28
C PEKERJAAN STRUKTUR
I
1 Pek. Tiang pancang Ulin 10x10x200 cm 12,057,999.11 1.79 1.79
2 Pek. Sunduk Balok Ulin 5/10 cm 1,907,622.21 0.28 0.28
3 Pek. Kalang Papan Ulin 2x10 cm 2,569,574.69 0.38 0.38
4 Pek. Anstamping Batu Gunung 7,032,003.99 1.04 1.04
5 Pek. Pondasi Batu Gunung 39,757,164.26 5.91 5.91
D PEKERJAAN BETON
1 Pek. Sloof beton (15/20)
- Bekisting 10,813,444.03 1.61 1.61
- Pembesian 16,226,070.77 2.41 2.41
- Beton (Mutu Fc = 14.5 Mpa) 4,134,648.93 0.61 0.61
2 Pek. Kolom beton (15/15)
- Bekisting 29,076,149.51 4.32 4.32
- Pembesian 27,457,264.39 4.08 4.08
- Beton (Mutu Fc = 14.5 Mpa) 5,563,910.28 0.83 0.83
3 Pek. Balok (15/20), TOC2,95/TOB2,75
- Bekisting 10,813,444.03 1.61 1.61
- Pembesian 16,226,070.77 2.41 2.41
- Beton (Mutu Fc = 14.5 Mpa) 4,134,648.93 0.61 0.61
4 Pek. Balok (15/15), TOC3,55/TOB3,40
- Bekisting 2,102,614.12 0.31 0.31
- Pembesian 4,020,461.28 0.60 0.60
- Beton (Mutu Fc = 14.5 Mpa) 803,959.51 0.12 0.12
5 Pek. RingBalk (15/20)
- Bekisting 10,813,444.03 1.61 1.61
- Pembesian 16,226,070.77 2.41 2.41
- Beton (Mutu Fc = 14.5 Mpa) 4,134,648.93 0.61 0.61
6 Pek. Dak Beton
- Bekisting 7,339,124.51 1.09 1.09
- Pembesian 7,961,804.51 1.18 1.18
- Beton (Mutu Fc = 14.5 Mpa) 2,616,058.73 0.39 0.39
7 Rabatan Dibawah Lantai t=10 cm (Mutu Fc = 14.5 Mpa 5,921,225.62 0.88 0.88
E PEKERJAAN ARSITEKTUR
E.I PEKERJAAN DINDING
1 Pas. Dinding 1/2 Bata 1 Pc 4 Psr 63,221,353.13 9.39 9.39
2 Pek. Pas. Plesteran 1 Pc 4 Psr 39,288,060.34 5.84 2.92 2.92
3 Pek. Acian 23,181,081.57 3.44 3.44
4 Pek. Dinding keramik 25 x 40 cm 22,482,448.56 3.34 3.34
E.II PEKERJAAN PLAFOND
1 Pek. Plafond gypsum bord 9 mm 4,980,977.97 0.74 0.74
2 Rangka Hollow 25,577,440.16 3.80 3.80
3 Pek. List plafond gypsum 2,898,748.12 0.43 0.43
E.III PEKERJAAN LANTAI
1 Pek. Lantai keramik 40 x 40 cm 28,587,747.85 4.25 2.12 2.12
2 Pek. Lantai keramik 30 x 30 cm 1,450,408.52 0.22 0.22
3 Pek. Lantai keramik 25 x 25 cm 1,385,987.18 0.21 0.21
E.IV PEKERJAAN KUSEN DAN PINTU
1 Pek. Daun pintu dan jendela kaca, Kayu Kelas 1, P1
- Kusen 5,928,066.77 0.88 0.88
- Daun Pintu Panil 1,899,791.14 0.28 0.28
- Pemasangan Kaca 210,728.18 0.03 0.03
2 Pek. Daun pintu dan jendela kaca, Kayu Kelas 1, P2
- Kusen 16,380,184.49 2.43 2.43
- Daun Pintu Panil 5,129,436.07 0.76 0.76
0 - Pemasangan Kaca 568,966.08 0.08 0.08
3 Pek. Daun pintu Panel P3
- Kusen 4,212,047.44 0.63 0.63
- Daun Pintu Panil 1,208,958.00 0.18 0.18
4 Pek. Jendela kaca, Kayu Kelas 1, J1
- Kusen 44,928,506.02 6.67 6.67
- Daun Jendela kaca 9,135,360.00 1.36 1.36
5 Pek. Ventilasi kaca, Kayu Kelas 1, V1
- Kusen 2,652,029.87 0.39 0.39
- Daun Jendela kaca 342,576.00 0.05 0.05
E.V PEKERJAAN KUNCI DAN PENGGANTUNG
1 Engsel pintu ss 1,242,000.00 0.18 0.18
2 Handle double swing 498,800.00 0.07 0.07
3 Handle single 513,600.00 0.08 0.08
4 Engsel Jendela 1,582,000.00 0.23 0.23
5 kunci slot 903,000.00 0.13 0.13
6 kunci tanam kamar mandi 198,950.00 0.03 0.03
E.VI PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk 3,264,044.46 0.48 0.48
2 Pek. Pas. Hand shower 2,284,125.19 0.34 0.34
3 Pek. Pas. Jet washer 892,328.00 0.13 0.13
4 Pek. Pas. Krant air 177,477.96 0.03 0.03
5 Pek. Pas. Floor drain 197,058.18 0.03 0.03
6 Pas. Pipa PVC 2 Saluran Air Bersih 1,831,681.56 0.27 0.27
7 Pas. Pipa PVC 4 Saluran Air Kotor 1,714,737.73 0.25 0.25
E.VII PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
1 Pek. Rangka atap baja ringan 34,230,837.16 5.08 5.08
2 Pek. Penutup Atap Genteng Metal 29,943,274.61 4.45 4.45
3 Pek. Bubungan Atap Genteng Metal 7,025,019.86 1.04 1.04
4 Pek. Listplank kayu 2/20 3,857,364.11 0.57 0.57
E.VIII PEKERJAAN INSTALASI LISTRIK
1 Titik Instalasi Penerangan & Stop Kontak 2,694,400.00 0.40 0.40
2 Fitting Lampu 138,400.00 0.02 0.02
3 Pasang Box Panel + MCB 3 Group,1 spare 721,217.11 0.11 0.11
4 Lampu DL 10 Watt 971,849.74 0.14 0.14
5 Lampu DL 20 Watt 1,809,235.56 0.27 0.27
6 Saklar Ganda 690,234.34 0.10 0.10
7 Saklar Tunggal 442,732.22 0.07 0.07
8 Stop Kontak + Instalasi 1,700,880.06 0.25 0.25
WAKTU PELAKSANAAN
No URAIAN PEKERJAAN JUMLAH (Rp) BOBOT BULAN I BULAN II Ket
%
I II III IV I II III
A PEKERJAAN PENDAHULUAN
1 Pengukuran & Pemasangan Bouwplank 2,750,000.00 0.41 0.41
2 Pemasangan papan nama proyek 500,000.00 0.07 0.07
B PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi Batu Gunung 509,757.63 0.08 0.08
2 Pek. Urugan Tanah Kembali 563,371.02 0.08 0.08
3 Pek. Urugan Pasir Alas Pondasi 1,966,017.44 0.29 0.29
4 Pek. Urugan Pasir Bawah Lantai, t=13 cm 3,418,827.73 0.51 0.51
5 Pek. Lantai kerja, t=7 cm 8,600,497.45 1.28 1.28
C PEKERJAAN STRUKTUR
I
1 Pek. Tiang pancang Ulin 10x10x200 cm 12,057,999.11 1.79 1.79
2 Pek. Sunduk Balok Ulin 5/10 cm 1,907,622.21 0.28 0.28
3 Pek. Kalang Papan Ulin 2x10 cm 2,569,574.69 0.38 0.38
4 Pek. Anstamping Batu Gunung 7,032,003.99 1.04 1.04
5 Pek. Pondasi Batu Gunung 39,757,164.26 5.91 5.91
D PEKERJAAN BETON
1 Pek. Sloof beton (15/20)
- Bekisting 10,813,444.03 1.61 1.61
- Pembesian 16,226,070.77 2.41 2.41
- Beton (Mutu Fc = 14.5 Mpa) 4,134,648.93 0.61 0.61
2 Pek. Kolom beton (15/15)
- Bekisting 29,076,149.51 4.32 4.32
- Pembesian 27,457,264.39 4.08 4.08
- Beton (Mutu Fc = 14.5 Mpa) 5,563,910.28 0.83 0.83
3 Pek. Balok (15/20), TOC2,95/TOB2,75
- Bekisting 10,813,444.03 1.61 1.61
- Pembesian 16,226,070.77 2.41 2.41
- Beton (Mutu Fc = 14.5 Mpa) 4,134,648.93 0.61 0.61
4 Pek. Balok (15/15), TOC3,55/TOB3,40
- Bekisting 2,102,614.12 0.31 0.31
- Pembesian 4,020,461.28 0.60 0.60
- Beton (Mutu Fc = 14.5 Mpa) 803,959.51 0.12 0.12
5 Pek. RingBalk (15/20)
- Bekisting 10,813,444.03 1.61 1.61
- Pembesian 16,226,070.77 2.41 2.41
- Beton (Mutu Fc = 14.5 Mpa) 4,134,648.93 0.61 0.61
6 Pek. Dak Beton
- Bekisting 7,339,124.51 1.09 1.09
- Pembesian 7,961,804.51 1.18 1.18
- Beton (Mutu Fc = 14.5 Mpa) 2,616,058.73 0.39 0.39
7 Rabatan Dibawah Lantai t=10 cm (Mutu Fc = 14.5 Mpa 5,921,225.62 0.88 0.88
E PEKERJAAN ARSITEKTUR
E.I PEKERJAAN DINDING
1 Pas. Dinding 1/2 Bata 1 Pc 4 Psr 63,221,353.13 9.39 9.39
2 Pek. Pas. Plesteran 1 Pc 4 Psr 39,288,060.34 5.84 2.92 2.92
3 Pek. Acian 23,181,081.57 3.44 3.44
4 Pek. Dinding keramik 25 x 40 cm 22,482,448.56 3.34 3.34
E.II PEKERJAAN PLAFOND
1 Pek. Plafond gypsum bord 9 mm 4,980,977.97 0.74 0.74
2 Rangka Hollow 25,577,440.16 3.80 3.80
3 Pek. List plafond gypsum 2,898,748.12 0.43 0.43
E.III PEKERJAAN LANTAI
1 Pek. Lantai keramik 40 x 40 cm 28,587,747.85 4.25 2.12 2.12
2 Pek. Lantai keramik 30 x 30 cm 1,450,408.52 0.22 0.22
3 Pek. Lantai keramik 25 x 25 cm 1,385,987.18 0.21 0.21
E.IV PEKERJAAN KUSEN DAN PINTU
1 Pek. Daun pintu dan jendela kaca, Kayu Kelas 1, P1
- Kusen 5,928,066.77 0.88 0.88
- Daun Pintu Panil 1,899,791.14 0.28 0.28
- Pemasangan Kaca 210,728.18 0.03 0.03
2 Pek. Daun pintu dan jendela kaca, Kayu Kelas 1, P2
- Kusen 16,380,184.49 2.43 2.43
- Daun Pintu Panil 5,129,436.07 0.76 0.76
0 - Pemasangan Kaca 568,966.08 0.08 0.08
3 Pek. Daun pintu Panel P3
- Kusen 4,212,047.44 0.63 0.63
- Daun Pintu Panil 1,208,958.00 0.18 0.18
4 Pek. Jendela kaca, Kayu Kelas 1, J1
- Kusen 44,928,506.02 6.67 6.67
- Daun Jendela kaca 9,135,360.00 1.36 1.36
5 Pek. Ventilasi kaca, Kayu Kelas 1, V1
- Kusen 2,652,029.87 0.39 0.39
- Daun Jendela kaca 342,576.00 0.05 0.05
E.V PEKERJAAN KUNCI DAN PENGGANTUNG
1 Engsel pintu ss 1,242,000.00 0.18 0.18
2 Handle double swing 498,800.00 0.07 0.07
3 Handle single 513,600.00 0.08 0.08
4 Engsel Jendela 1,582,000.00 0.23 0.23
5 kunci slot 903,000.00 0.13 0.13
6 kunci tanam kamar mandi 198,950.00 0.03 0.03
E.VI PEKERJAAN SANITAIR
1 Pek. Pas. Kloset duduk 3,264,044.46 0.48 0.48
2 Pek. Pas. Hand shower 2,284,125.19 0.34 0.34
3 Pek. Pas. Jet washer 892,328.00 0.13 0.13
4 Pek. Pas. Krant air 177,477.96 0.03 0.03
5 Pek. Pas. Floor drain 197,058.18 0.03 0.03
6 Pas. Pipa PVC 2 Saluran Air Bersih 1,831,681.56 0.27 0.27
7 Pas. Pipa PVC 4 Saluran Air Kotor 1,714,737.73 0.25 0.25
E.VII PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
1 Pek. Rangka atap baja ringan 34,230,837.16 5.08 5.08
2 Pek. Penutup Atap Genteng Metal 29,943,274.61 4.45 4.45
3 Pek. Bubungan Atap Genteng Metal 7,025,019.86 1.04 1.04
4 Pek. Listplank kayu 2/20 3,857,364.11 0.57 0.57
E.VIII PEKERJAAN INSTALASI LISTRIK
1 Titik Instalasi Penerangan & Stop Kontak 2,694,400.00 0.40 0.40
2 Fitting Lampu 138,400.00 0.02 0.02
3 Pasang Box Panel + MCB 3 Group,1 spare 721,217.11 0.11 0.11
4 Lampu DL 10 Watt 971,849.74 0.14 0.14
5 Lampu DL 20 Watt 1,809,235.56 0.27 0.27
6 Saklar Ganda 690,234.34 0.10 0.10
7 Saklar Tunggal 442,732.22 0.07 0.07
8 Stop Kontak + Instalasi 1,700,880.06 0.25 0.25
Jenis Pekerjaan : Pasangan 1 M3 Pondasi Cyclopen 60% Camp 1Pc:2PB:3Kr 40% Batu Belah
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.10
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 3.4 103620
2 Tukang OH 0.8500 110,880.00
3 Kepala Tukang OH 0.0850 114,180.00
4 Mandor OH 0.1700 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Gunung/ Batu Kali M3 0.48 290664
2 Semen Portland (PC) Kg 194.0000 1,248.72
3 Pasir Beton (M3) M3 0.3120 412,500.00
4 Kerikil (M3) M3 0.4680 412,500.00
5 Besi Beton Kg 21,516.00
6 Kawat Beton Kg 21,186.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
Jenis Pekerjaan : Membuat Beton Mutu F'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 1.65 103,620.00
2 Tukang OH 0.28 110,880.00
3 Kepala Tukang OH 0.03 114,180.00
4 Mandor OH 0.08 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland (PC) Kg 247.00 1,248.72
2 Pasir Beton (PB) M3 0.62 412,500.00
3 Kerikil (KR) M3 0.74 412,500.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
Jenis Pekerjaan : Membuat Beton Mutu F'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, W/c = 0,78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 1.65 103620
2 Tukang OH 0.275 110,880.00
3 Kepala Tukang OH 0.028 114,180.00
4 Mandor OH 0.083 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland (PC) Kg 276 1248.72
2 Pasir Beton (PB) M3 0.591 412,500.00
3 Kerikil (KR) M3 0.750 412,500.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 1.65 103620
2 Tukang OH 0.2750 110,880.00
3 Kepala Tukang OH 0.0280 114,180.00
4 Mandor OH 0.0830 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland (PC) Kg 326 1248.72
2 Pasir Beton (PB) M3 0.543 412,500.00
3 Kerikil (KR) M3 0.762 412,500.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 1.65 103620
2 Tukang OH 0.2750 110,880.00
3 Kepala Tukang OH 0.0280 114,180.00
4 Mandor OH 0.0830 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland (PC) Kg 326 1248.72
2 Pasir Beton (PB) M3 0.543 412,500.00
3 Kerikil (KR) M3 0.762 412,500.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 1.65 103620
2 Tukang OH 0.2750 110,880.00
3 Kepala Tukang OH 0.0280 114,180.00
4 Mandor OH 0.0830 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland (PC) Kg 371 1248.72
2 Pasir Beton (PB) M3 0.499 412,500.00
3 Kerikil (KR) M3 0.776 412,500.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 1.65 103,620.00
2 Tukang OH 0.28 110,880.00
3 Kepala Tukang OH 0.03 114,180.00
4 Mandor OH 0.08 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland (PC) Kg 384.00 1,248.72
2 Pasir Beton (PB) M3 0.49 412,500.00
3 Kerikil (KR) M3 0.77 412,500.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 1.65 103620
2 Tukang OH 0.2750 110,880.00
3 Kepala Tukang OH 0.0280 114,180.00
4 Mandor OH 0.0830 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland (PC) Kg 406 1248.72
2 Pasir Beton (PB) M3 0.489 412,500.00
3 Kerikil (KR) M3 0.760 412,500.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Beton Mutu F'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 1.65 103620
2 Tukang OH 0.2750 110,880.00
3 Kepala Tukang OH 0.0280 114,180.00
4 Mandor OH 0.0830 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Semen Portland (PC) Kg 413 1248.72
2 Pasir Beton (PB) M3 0.486 412,500.00
3 Kerikil (KR) M3 0.756 412,500.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
Jenis Pekerjaan : Pasangan Dinding Bata ( 5 x 11 x 22 ) cm Tebal 1 Bata Camp. 1Pc : 2 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.60 103,620.00
2 Tukang OH 0.20 110,880.00
3 Kepala Tukang OH 0.02 114,180.00
4 Mandor OH 0.03 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Bata Bh 140.00 924.00
2 Semen Portland (PC) Kg 43.50 1,248.72
3 Pasir Pasang M3 0.08 239,250.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( E + F )
Jenis Pekerjaan : Pasangan Dinding Bata ( 4 x 10 x 20 ) cm Tebal 1 Bata Camp. 1Pc : 2 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1.a
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.6 103620
2 Tukang OH 0.2000 110,880.00
3 Kepala Tukang OH 0.0200 114,180.00
4 Mandor OH 0.0300 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Bata Bh 170 924
2 Semen Portland (PC) Kg 43.500 1,248.72
3 Pasir Pasang M3 0.080 239,250.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F )
Jenis Pekerjaan : Pasangan Dinding Bata ( 5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.3
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.60 103,620.00
2 Tukang OH 0.20 110,880.00
3 Kepala Tukang OH 0.02 114,180.00
4 Mandor OH 0.03 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Bata Bh 140.00 924.00
2 Semen Portland (PC) Kg 26.55 1,248.72
3 Pasir Pasang M3 0.09 239,250.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( E + F )
Jenis Pekerjaan : Pasangan Dinding Bata ( 4x10x20) cm Tebal 1 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.3.a
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.6 103620
2 Tukang OH 0.2000 110,880.00
3 Kepala Tukang OH 0.0200 114,180.00
4 Mandor OH 0.0300 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Bata Bh 170 924
2 Semen Portland (PC) Kg 26.550 1,248.72
3 Pasir Pasang M3 0.093 239,250.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F )
Jenis Pekerjaan : Pasangan Dinding Bata ( 5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.3 103620
2 Tukang OH 0.1000 110,880.00
3 Kepala Tukang OH 0.0100 114,180.00
4 Mandor OH 0.0150 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Bata Bh 70 924
2 Semen Portland (PC) Kg 18.950 1,248.72
3 Pasir Pasang M3 0.038 239,250.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F )
Jenis Pekerjaan : Pasangan Dinding Bata ( 4x10x20) cm Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7.a
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.3 103620
2 Tukang OH 0.1000 110,880.00
3 Kepala Tukang OH 0.0100 114,180.00
4 Mandor OH 0.0150 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Bata Bh 85 924
2 Semen Portland (PC) Kg 18.950 1,248.72
3 Pasir Pasang M3 0.038 239,250.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F )
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.3 103620
2 Tukang OH 0.1000 110,880.00
3 Kepala Tukang OH 0.0100 114,180.00
4 Mandor OH 0.0150 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Bata Bh 70 924
2 Semen Portland (PC) Kg 14.370 1,248.72
3 Pasir Pasang M3 0.040 239,250.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F )
Jenis Pekerjaan : Pasangan Dinding Bata ( 5 x 11 x 22 ) cmTebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.3 103620
2 Tukang OH 0.1000 110,880.00
3 Kepala Tukang OH 0.0100 114,180.00
4 Mandor OH 0.0150 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Bata Bh 70 924
2 Semen Portland (PC) Kg 11.500 1,248.72
3 Pasir Pasang M3 0.043 239,250.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F )
Jenis Pekerjaan : Pasangan Dinding Bata ( 4 x 10 x 20 ) cm Tebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9.a
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.3 103620
2 Tukang OH 0.1000 110,880.00
3 Kepala Tukang OH 0.0100 114,180.00
4 Mandor OH 0.0150 120,780.00
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Bata Bh 85 924
2 Semen Portland (PC) Kg 11.500 1,248.72
3 Pasir Pasang M3 0.043 239,250.00
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F )
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.3 103620
2 Tukang OH 0.1 110880
3 Kepala Tukang OH 0.01 114180
4 Mandor OH 0.015 120780
Jumlah Tenaga Kerja
B. BAHAN
1 Batu Bata Bh 70 924
2 Semen Portland (PC) Kg 9.68 1248.72
3 Pasir Pasang M3 0.045 239250
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F )
Jenis Pekerjaan : Memasang Langit-Langit Tripleks Ukuran (120 x 240) cm, tebal 6 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5
No Uraian Satuan Koefisien Harga Satuan
A. TENAGA
1 Pekerja OH 0.1 103620
2 Tukang OH 0.1 110880
3 Kepala Tukang OH 0.01 114180
4 Mandor OH 0.005 120780
Jumlah Tenaga Kerja
B. BAHAN
1 Multipleks t= 6 mm Lbr 0.375 68838
2 Paku 3/4 "- 1" Kg 0.03 29502
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E )
10,362.00
11,088.00
1,141.80
603.90
23,195.70
32,703.26
5,900.40
12,134.89
50,738.56
73,934.26
7,393.43
81,327.68
Jumlah Harga
10,362.00
6,039.00
16,401.00
-
16,401.00
1,640.10
18,041.10
Jumlah Harga
77,715.00
3,019.50
80,734.50
-
80,734.50
8,073.45
88,807.95
Jumlah Harga
93,258.00
5,435.10
98,693.10
-
4500
98,693.10
9,869.31
108,562.41
Jumlah Harga
108,801.00
8,092.26
116,893.26
-
116,893.26
11,689.33
128,582.59
Jumlah Harga
25,905.00
10,060.97
35,965.97
-
35,965.97
3,596.60
39,562.57
Jumlah Harga
51,810.00
6,039.00
57,849.00
-
57,849.00
5,784.90
63,633.90
Jumlah Harga
51,810.00
6,039.00
57,849.00
44510.4
44,510.40
2590.5
2,590.50
104,949.90
10,494.99
115,444.89
Jumlah Harga
31,086.00
1,207.80
32,293.80
199,821.60
199,821.60
-
232,115.40
23,211.54
255,326.94
Jumlah Harga
31,086.00
1,207.80
32,293.80
44,510.40
44,510.40
-
76,804.20
7,680.42
84,484.62
Jumlah Harga
25905
3,019.50
28,924.50
343411.2
343,411.20
-
372,335.70
37,233.57
409,569.27
Jumlah Harga
155430
83,160.00
8,563.50
9,058.50
256,212.00
348796.8
203,541.36
124,410.00
676,748.16
-
932,960.16
93,296.02
1,026,256.18
Jumlah Harga
80823.6
43,243.20
4,453.02
4,710.42
133,230.24
348796.8
71,935.78
420,732.58
-
553,962.82
55,396.28
609,359.10
Jumlah Harga
352308
94,248.00
9,705.30
20,532.60
476,793.90
139518.72
242,251.68
128,700.00
193,050.00
-
-
703,520.40
-
1,180,314.30
118,031.43
1,298,345.73
Jumlah Harga
170,973.00
30,492.00
3,197.04
10,024.74
214,686.78
308,433.84
256,044.64
305,250.00
869,728.48
-
1,084,415.26
108,441.53
1,192,856.79
Jumlah Harga
170973
30,492.00
3,197.04
10,024.74
214,686.78
344646.72
243,964.29
309,222.22
897,833.23
-
1,112,520.01
111,252.00
1,223,772.01
Jumlah Harga
170973
30,492.00
3,197.04
10,024.74
214,686.78
407082.72
223,928.57
314,416.67
945,427.96
-
1,160,114.74
116,011.47
1,276,126.21
Jumlah Harga
170973
30,492.00
3,197.04
10,024.74
214,686.78
407082.72
223,928.57
314,416.67
945,427.96
-
1,160,114.74
116,011.47
1,276,126.21
Jumlah Harga
170973
30,492.00
3,197.04
10,024.74
214,686.78
463275.12
205,660.71
319,916.67
988,852.50
-
1,203,539.28
120,353.93
1,323,893.21
Jumlah Harga
170,973.00
30,492.00
3,197.04
10,024.74
214,686.78
479,508.48
203,892.86
317,472.22
1,000,873.56
-
1,215,560.34
121,556.03
1,337,116.37
Jumlah Harga
170973
30,492.00
3,197.04
10,024.74
214,686.78
506980.32
201,535.71
313,500.00
1,022,016.03
-
1,236,702.81
123,670.28
1,360,373.10
Jumlah Harga
170973
30,492.00
3,197.04
10,024.74
214,686.78
515721.36
200,651.79
311,972.22
1,028,345.37
-
1,243,032.15
124,303.21
1,367,335.36
Jumlah Harga
7,253.40
7,761.60
799.26
4,831.20
20,645.46
225,918.00
3,177.90
229,095.90
-
249,741.36
24,974.14
2,497.41
27,471.55
Jumlah Harga
7,253.40
7,761.60
799.26
4,831.20
20,645.46
334,372.50
3,177.90
337,550.40
-
358,195.86
35,819.59
3,581.96
39,401.54
Jumlah Harga
2,590.50
2,772.00
228.36
120.78
5,711.64
14,675.76
1,059.30
15,735.06
-
21,446.70
2,144.67
23,591.37
Jumlah Harga
53,882.40
28,828.80
2,968.68
3,140.28
88,820.16
78,426.48
8,850.60
303.60
87,580.68
-
176,400.84
17,640.08
194,040.92
64,680.31
Jumlah Harga
55954.8
29,937.60
3,082.86
6,522.12
95,497.38
26142.16
11,800.80
607.20
38,550.16
-
134,047.54
13,404.75
147,452.29
Jumlah Harga
68389.2
36,590.40
3,767.94
7,971.48
116719.02
26142.16
11,800.80
800.00
35,441.96
36,844.50
35,332.00
146361.4204
-
263,080.44
26,308.04
289,388.48
Jumlah Harga
68389.2
36,590.40
3,767.94
7,971.48
116,719.02
26142.16
11,800.80
800.00
35,441.96
36,844.50
35,332.00
146,361.42
-
263,080.44
26,308.04
289,388.48
Jumlah Harga
68389.2
36,590.40
3,767.94
3,985.74
112,733.28
78426.48
11,800.80
800.00
52,120.53
36,844.50
317,988.00
497,980.31
-
509,781.11
50,978.11
560,759.22
Jumlah Harga
68389.2
36,590.40
3,767.94
3,985.74
112,733.28
58819.86
11,800.80
800.00
69,494.04
36,844.50
158,994.00
90,000.00
426,753.20
-
427,553.20
42,755.32
470,308.52
Jumlah Harga
68389.2
36,590.40
3,767.94
3,985.74
112,733.28
58819.86
11,800.80
600.00
52,120.53
36,844.50
105,996.00
266,181.69
-
277,982.49
27,798.25
305,780.74
Jumlah Harga
15543
5,544.00
570.90
966.24
22,624.14
51761.4768
17,701.20
600.00
26,499.00
96,561.68
-
114,262.88
11,426.29
125,689.16
Jumlah Harga
6217.2
6,652.80
685.08
362.34
13,917.42
24363.9
24,363.90
-
38,281.32
3,828.13
42,109.45
Jumlah Harga
6217.2
6,652.80
685.08
362.34
13,917.42
12219.9
12,219.90
-
26,137.32
2,613.73
28,751.05
Jumlah Harga
4455.66
4,767.84
490.97
253.64
9,968.11
36300
1,600.00
5,940.00
43,840.00
-
53,808.11
5,380.81
59,188.92
Jumlah Harga
25905
27,720.00
2,854.50
1,570.14
58049.64
65586.675
15,928.19
81514.8675
-
139,564.51
13,956.45
153,520.96
Jumlah Harga
62,172.00
22,176.00
2,283.60
3,623.40
90,255.00
129,360.00
54,319.32
19,140.00
202,819.32
-
293,074.32
29,307.43
322,381.75
Jumlah Harga
62172
22,176.00
2,283.60
3,623.40
90,255.00
157080
54,319.32
19,140.00
230,539.32
-
320,794.32
32,079.43
352,873.75
Jumlah Harga
62172
22,176.00
2,283.60
3,623.40
90,255.00
129360
41,145.32
21,771.75
192,277.07
-
282,532.07
28,253.21
310,785.28
Jumlah Harga
62,172.00
22,176.00
2,283.60
3,623.40
90,255.00
129,360.00
33,153.52
22,250.25
184,763.77
-
275,018.77
27,501.88
302,520.64
Jumlah Harga
62172
22,176.00
2,283.60
3,623.40
90,255.00
157080
33,153.52
22,250.25
212,483.77
-
302,738.77
30,273.88
333,012.64
Jumlah Harga
62172
22,176.00
2,283.60
3,623.40
90,255.00
129360
27,721.58
24,403.50
181,485.08
-
271,740.08
27,174.01
298,914.09
Jumlah Harga
31086
11,088.00
1,141.80
1,811.70
45,127.50
64680
23,663.24
9,091.50
97,434.74
-
142,562.24
14,256.22
156,818.47
Jumlah Harga
31086
11,088.00
1,141.80
1,811.70
45,127.50
78540
23,663.24
9,091.50
111,294.74
-
156,422.24
15,642.22
172,064.47
Jumlah Harga
31086
11,088.00
1,141.80
1,811.70
45,127.50
64680
17,944.11
9,570.00
92,194.11
-
137,321.61
13,732.16
151,053.77
Jumlah Harga
31086
11,088.00
1,141.80
1,811.70
45,127.50
64680
14,360.28
10,287.75
89,328.03
-
134,455.53
13,445.55
147,901.08
Jumlah Harga
31086
11,088.00
1,141.80
1,811.70
45,127.50
78540
14,360.28
10,287.75
103,188.03
-
148,315.53
14,831.55
163,147.08
Jumlah Harga
31086
11088
1141.8
1811.7
45,127.50
64680
12087.6096
10766.25
87,533.86
-
132,661.36
13,266.14
145,927.50
Jumlah Harga
31086
11088
1141.8
1811.7
45,127.50
231000
13735.92
8373.75
253,109.67
-
298,237.17
29,823.72
328,060.89
Jumlah Harga
31086
11088
1141.8
1811.7
45,127.50
231000
13735.92
8373.75
253,109.67
-
298,237.17
29,823.72
328,060.89
Jumlah Harga
31086
16,632.00
1,712.70
1,811.70
51,242.40
19360.15488
3,828.00
23,188.15
-
74,430.55
7,443.06
81,873.61
Jumlah Harga
31,086.00
16,632.00
1,712.70
1,811.70
51,242.40
12,766.91
4,785.00
17,551.91
-
68,794.31
6,879.43
75,673.74
Jumlah Harga
31086
16632
1712.7
1811.7
51,242.40
9710.04672
5502.75
15,212.80
-
66,455.20
6,645.52
73,100.72
Jumlah Harga
31,086.00
16,632.00
1,712.70
1,811.70
51,242.40
7,792.01
5,742.00
13,534.01
-
64,776.41
6,477.64
71,254.05
Jumlah Harga
31086
16632
1712.7
1811.7
51,242.40
6473.36448
6220.5
12,693.86
-
63,936.26
6,393.63
70,329.89
Jumlah Harga
20724
11088
1141.8
1207.8
34,161.60
4058.34
4,058.34
-
38,219.94
3,821.99
42,041.93
Jumlah Harga
72534
38808
3996.3
4227.3
119,565.60
466730.88
10227.0168
10766.25
4276.8
492,000.95
-
611,566.55
61,156.65
672,723.20
Jumlah Harga
72534
38808
3996.3
4227.3
119,565.60
2006103
12986.688
10766.25
4276.8
2,034,132.74
-
2,153,698.34
215,369.83
2,369,068.17
Jumlah Harga
72534
38808
3996.3
4227.3
119,565.60
681120
10227.0168
10766.25
4276.8
706,390.07
-
825,955.67
82,595.57
908,551.23
Jumlah Harga
72534
38808
3996.3
4227.3
119,565.60
4583007
12487.2
10766.25
3960
4,610,220.45
-
4,729,786.05
472,978.61
5,202,764.66
Jumlah Harga
72534
38808
3996.3
4227.3
119,565.60
3504237.66
12487.2
10766.25
3960
3,531,451.11
-
3,651,016.71
365,101.67
4,016,118.38
Jumlah Harga
72534
38808
3996.3
4227.3
119,565.60
2425668.3
12487.2
10766.25
3960
2,452,881.75
-
2,572,447.35
257,244.74
2,829,692.09
Jumlah Harga
72534
38808
3996.3
4227.3
119,565.60
2577217.5
12487.2
10766.25
3960
2,604,430.95
-
2,723,996.55
272,399.66
2,996,396.21
Jumlah Harga
9325.8
9979.2
3996.3
603.9
23,905.20
172451.4
1423.5408
717.75
66
174,658.69
-
198,563.89
19,856.39
218,420.28
Jumlah Harga
9325.8
9979.2
3996.3
603.9
23,905.20
60060
1423.5408
717.75
66
62,267.29
-
86,172.49
8,617.25
94,789.74
Jumlah Harga
93258
49896
5138.1
5435.1
153,727.20
866104.8
11613.096
4306.5
5121.6
887,146.00
-
1,040,873.20
104,087.32
1,144,960.52
Jumlah Harga
93258
49896
5138.1
5435.1
153,727.20
593960.4
11613.096
4306.5
5121.6
615,001.60
-
768,728.80
76,872.88
845,601.68
Jumlah Harga
72534
38808
3996.3
4227.3
119,565.60
83272.2
14672.46
8373.75
106,318.41
-
225,884.01
22,588.40
248,472.41
Jumlah Harga
72534
38808
3996.3
4227.3
119,565.60
13358.4
14672.46
8373.75
36,404.61
-
155,970.21
15,597.02
171,567.23
Jumlah Harga
10362
11088
1141.8
603.9
23,195.70
25814.25
885.06
26,699.31
-
49,895.01
4,989.50
54,884.51
Jumlah Harga
82896
88704
9134.4
4831.2
185,565.60
57230.91
295.02
57,525.93
-
243,091.53
24,309.15
267,400.68
Jumlah Harga
10362
5544
570.9
603.9
17,080.80
27002.976
4660.92
31,663.90
-
48,744.70
4,874.47
53,619.17
Jumlah Harga
5181
5544
570.9
362.34
11,658.24
10724.175
348.48
11,072.66
-
22,730.90
2,273.09
25,003.98
Jumlah Harga
5181
5544
570.9
362.34
11,658.24
10325.7
325.38
10,651.08
-
22,309.32
2,230.93
24,540.25
Jumlah Harga
14506.8
7761.6
799.26
84.546
23,152.21
18612
195228
213,840.00
-
236,992.21
23,699.22
260,691.43
Jumlah Harga
15543
33264
3425.4
90585
142,817.40
45816.2628
5900.4
51,716.66
-
194,534.06
19,453.41
213,987.47
Jumlah Harga
14506.8
7761.6
799.26
84.546
23,152.21
32709.6
236016
268,725.60
-
291,877.81
29,187.78
321,065.59
Jumlah Harga
8,704.08
13,860.00
1,484.34
483.12
24,531.54
108,979.20
177,012.00
285,991.20
-
310,522.74
31,052.27
341,575.01
Jumlah Harga
8704.08
13860
1484.34
483.12
24,531.54
40002.6
177012
217,014.60
-
241,546.14
24,154.61
265,700.75
Jumlah Harga
14,506.80
44,352.00
4,567.20
8,454.60
71,880.60
14,479.74
13,055.87
37,100.00
29,150.00
93,785.61
-
165,666.21
16,566.62
182,232.83
NO IJASAH POSISI KEAHLIAN KODE
1. SKT Pengawas Bangunan Gedung TA 024
1 S1Teknik Sipil Site Manager 10 thn
2. SKT Pelaksana Bangunan Gedung/Pekerjaan Gedung TA 022
3 S1 Teknik Sipil Quantity Control 5 thn SKT Pelaksana Bangunan Gedung / Pekerjaan Gedung TS 051
7 STM/SMK Tukang Listrik 5 thn SKT Teknisi Instalasi Penerangan dan Daya Phase Tiga TE 022
BELUM ADA
OK
OK
BELUM ADA
OK
OK