TAHUN ANGGARAN 2018
HARGA SATUAN
NO URAIAN VOLUME SATUAN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6
I Belanja Modal
Papan #REF! Kpg Rp 50,000.00 #REF!
Seng #REF! Lbr Rp 60,000.00 #REF!
Kayu 2/3 #REF! Btg Rp 50,000.00 #REF!
Kayu 2/2 7.00 Btg Rp 30,000.00 Rp 210,000.00
Besi Dia.10 mm 10.00 Btg Rp 60,000.00 Rp 600,000.00
Kawat Ikat 1.00 Kg Rp 40,000.00 Rp 40,000.00
Paku #REF! Kg Rp 20,000.00 #REF!
Batako 395.00 Bh Rp 3,000.00 Rp 1,185,000.00
Rabung Seng #REF! Lbr Rp 15,000.00 #REF!
Paku Tripleks #REF! Ktk Rp 5,000.00 #REF!
Jendela #REF! Unit Rp 400,000.00 #REF!
Pasir #REF! M3 Rp 100,000.00 #REF!
Semen #REF! M3 Rp 60,000.00 #REF!
Cat 102.00 Kg Rp 12,500.00 Rp 1,275,000.00
#REF! #REF! Lbr #REF! #REF!
Sub Total #REF!
II Belanja Barang dan Jasa
A. Upah Kerja
1 Pekerja #REF! OH Rp 90,000.00 #REF!
2 Tukang #REF! OH Rp 133,000.00 #REF!
Sub Total #REF!
B. Belanja Alat
1 Kuas 2.00 bh Rp 10,000.00 Rp 20,000.00
2 Belanja Papan Kegiatan 5.00 Ls Rp 300,000.00 Rp 1,500,000.00
Sub Total Rp 1,520,000.00
C. Honorarium Pengadaan Barang / Jasa di Desa
1 Operasional TPK
- Penanggung Jawab 1.00 Ls Rp 750,000.00 Rp 750,000.00
- Ketua TPK 1.00 Ls Rp 600,000.00 Rp 600,000.00
- Anggota 2.00 Ls Rp 400,000.00 Rp 800,000.00
2 Biaya Pembuatan RAB dan Gambar 1.00 Ls Rp 1,000,000.00 Rp 1,000,000.00
3 Biaya Pengawasan 1.00 Ls Rp 750,000.00 Rp 750,000.00
4 Biaya Dokumentasi 1.00 Ls Rp 250,000.00 Rp 250,000.00
Sub Total 4,150,000.00
JUMLAH TOTAL #REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
RENCANA ANGGARAN BIAYA
#REF!
TAHUN ANGGARAN 2018
PENERIMA : SUGIANTO
HARGA SATUAN
NO URAIAN VOLUME SATUAN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6
I Belanja Modal
Papan 70.00 Kpg Rp 50,000.00 Rp 3,500,000.00
Seng 40.00 Lbr Rp 60,000.00 Rp 2,400,000.00
Kayu 2/3 32.00 Btg Rp 50,000.00 Rp 1,600,000.00
Paku 10.00 Kg Rp 20,000.00 Rp 200,000.00
Cat 24.00 Kg Rp 12,500.00 Rp 300,000.00
Rabung Seng 5.00 Lbr Rp 15,000.00 Rp 75,000.00
Sub Total Rp 8,075,000.00
II Belanja Barang dan Jasa
A. Upah Kerja
1 Pekerja 14.00 OH Rp 90,000.00 Rp 1,260,000.00
2 Tukang 5.00 OH Rp 133,000.00 Rp 665,000.00
Sub Total Rp 1,925,000.00
B. Belanja Alat
1 Belanja Papan Kegiatan 1.00 Ls Rp 300,000.00 Rp 300,000.00
Sub Total Rp 300,000.00
C. Honorarium Pengadaan Barang / Jasa di Desa
1 Operasional TPK
- Penanggung Jawab 1.00 Ls Rp 150,000.00 Rp 150,000.00
- Ketua TPK 1.00 Ls Rp 120,000.00 Rp 120,000.00
- Anggota 2.00 Ls Rp 80,000.00 Rp 160,000.00
2 Biaya Pembuatan RAB dan Gambar 1.00 Ls Rp 200,000.00 Rp 200,000.00
3 Biaya Pengawasan 1.00 Ls Rp 150,000.00 Rp 150,000.00
4 Biaya Dokumentasi 1.00 Ls Rp 50,000.00 Rp 50,000.00
Sub Total 830,000.00
JUMLAH TOTAL 11,130,000.00
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
RENCANA ANGGARAN BIAYA
#REF!
TAHUN ANGGARAN 2018
PENERIMA : SAPARI
HARGA SATUAN
NO URAIAN VOLUME SATUAN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6
I Belanja Modal
Papan 96.00 Kpg Rp 50,000.00 Rp 4,800,000.00
Seng 20.00 Lbr Rp 60,000.00 Rp 1,200,000.00
Kayu 2/3 30.00 Btg Rp 50,000.00 Rp 1,500,000.00
Paku 10.00 Kg Rp 20,000.00 Rp 200,000.00
Cat 30.00 Kg Rp 12,500.00 Rp 375,000.00
Sub Total Rp 8,075,000.00
II Belanja Barang dan Jasa
A. Upah Kerja
1 Pekerja 14.00 OH Rp 90,000.00 Rp 1,260,000.00
2 Tukang 5.00 OH Rp 133,000.00 Rp 665,000.00
Sub Total Rp 1,925,000.00
B. Belanja Alat
1 Belanja Papan Kegiatan 1.00 Ls Rp 300,000.00 Rp 300,000.00
Sub Total Rp 300,000.00
C. Honorarium Pengadaan Barang / Jasa di Desa
1 Operasional TPK
- Penanggung Jawab 1.00 Ls Rp 150,000.00 Rp 150,000.00
- Ketua TPK 1.00 Ls Rp 120,000.00 Rp 120,000.00
- Anggota 2.00 Ls Rp 80,000.00 Rp 160,000.00
2 Biaya Pembuatan RAB dan Gambar 1.00 Ls Rp 200,000.00 Rp 200,000.00
3 Biaya Pengawasan 1.00 Ls Rp 150,000.00 Rp 150,000.00
4 Biaya Dokumentasi 1.00 Ls Rp 50,000.00 Rp 50,000.00
Sub Total 830,000.00
JUMLAH TOTAL 11,130,000.00
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
RENCANA ANGGARAN BIAYA
#REF!
TAHUN ANGGARAN 2018
PENERIMA : HARSIANTONI
HARGA SATUAN
NO URAIAN VOLUME SATUAN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6
I Belanja Modal
Papan 42.00 Kpg Rp 50,000.00 Rp 2,100,000.00
Seng 25.00 Lbr Rp 60,000.00 Rp 1,500,000.00
Kayu 2/3 20.00 Btg Rp 50,000.00 Rp 1,000,000.00
Kayu 2/2 7.00 Btg Rp 30,000.00 Rp 210,000.00
Besi Dia.10 mm 10.00 Btg Rp 60,000.00 Rp 600,000.00
Kawat Ikat 1.00 Kg Rp 40,000.00 Rp 40,000.00
Paku 2.00 Kg Rp 20,000.00 Rp 40,000.00
Batako 395.00 Bh Rp 3,000.00 Rp 1,185,000.00
Cat 24.00 Unit Rp 12,500.00 Rp 300,000.00
Pasir 5.00 M3 Rp 100,000.00 Rp 500,000.00
Semen 10.00 M3 Rp 60,000.00 Rp 600,000.00
Sub Total Rp 8,075,000.00
II Belanja Barang dan Jasa
A. Upah Kerja
1 Pekerja 14.00 OH Rp 90,000.00 Rp 1,260,000.00
2 Tukang 5.00 OH Rp 133,000.00 Rp 665,000.00
Sub Total Rp 1,925,000.00
B. Belanja Alat
1 Belanja Papan Kegiatan 1.00 Ls Rp 300,000.00 Rp 300,000.00
Sub Total Rp 300,000.00
C. Honorarium Pengadaan Barang / Jasa di Desa
1 Operasional TPK
- Penanggung Jawab 1.00 Ls Rp 150,000.00 Rp 150,000.00
- Ketua TPK 1.00 Ls Rp 120,000.00 Rp 120,000.00
- Anggota 2.00 Ls Rp 80,000.00 Rp 160,000.00
2 Biaya Pembuatan RAB dan Gambar 1.00 Ls Rp 200,000.00 Rp 200,000.00
3 Biaya Pengawasan 1.00 Ls Rp 150,000.00 Rp 150,000.00
4 Biaya Dokumentasi 1.00 Ls Rp 50,000.00 Rp 50,000.00
Sub Total 830,000.00
JUMLAH TOTAL 11,130,000.00
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
RENCANA ANGGARAN BIAYA
#REF!
TAHUN ANGGARAN 2018
PENERIMA : MARIONO
HARGA SATUAN
NO URAIAN VOLUME SATUAN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6
I Belanja Modal
Papan 54.00 Kpg Rp 50,000.00 Rp 2,700,000.00
Seng 27.00 Lbr Rp 60,000.00 Rp 1,620,000.00
Kayu 2/3 30.00 Btg Rp 50,000.00 Rp 1,500,000.00
Paku 9.00 Kg Rp 20,000.00 Rp 180,000.00
Cat 24.00 Kg Rp 12,500.00 Rp 300,000.00
Rabung Seng 5.00 Lbr Rp 15,000.00 Rp 75,000.00
Jendela 3.00 Unit Rp 400,000.00 Rp 1,200,000.00
Pasir 5.00 M3 Rp 100,000.00 Rp 500,000.00
Sub Total Rp 8,075,000.00
II Belanja Barang dan Jasa
A. Upah Kerja
1 Pekerja 14.00 OH Rp 90,000.00 Rp 1,260,000.00
2 Tukang 5.00 OH Rp 133,000.00 Rp 665,000.00
Sub Total Rp 1,925,000.00
B. Belanja Alat
1 Belanja Papan Kegiatan 1.00 Ls Rp 300,000.00 Rp 300,000.00
Sub Total Rp 300,000.00
C. Honorarium Pengadaan Barang / Jasa di Desa
1 Operasional TPK
- Penanggung Jawab 1.00 Ls Rp 150,000.00 Rp 150,000.00
- Ketua TPK 1.00 Ls Rp 120,000.00 Rp 120,000.00
- Anggota 2.00 Ls Rp 80,000.00 Rp 160,000.00
2 Biaya Pembuatan RAB dan Gambar 1.00 Ls Rp 200,000.00 Rp 200,000.00
3 Biaya Pengawasan 1.00 Ls Rp 150,000.00 Rp 150,000.00
4 Biaya Dokumentasi 1.00 Ls Rp 50,000.00 Rp 50,000.00
Sub Total 830,000.00
JUMLAH TOTAL 11,130,000.00
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
RENCANA ANGGARAN BIAYA
#REF!
TAHUN ANGGARAN 2018
2. KEGIATAN #REF!
RINCIAN PENDANAAN
HARGA SATUAN
NO URAIAN VOLUME SATUAN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6
I Belanja Modal
Semen 62.00 Zak #REF! #REF!
#REF! 9.00 m3 #REF! #REF!
#REF! 6.00 m3 #REF! #REF!
Besi Dia 12 mm 53.00 btg Rp 85,000.00 Rp 4,505,000.00
Kawat Beton 10.00 Kg Rp 25,000.00 Rp 250,000.00
Papan Mal 50.00 Kpg Rp 50,000.00 Rp 2,500,000.00
Kayu 2/2 40.00 Btg Rp 40,000.00 Rp 1,600,000.00
Paku 10.00 kg Rp 21,000.00 Rp 210,000.00
Sub Total #REF!
II Belanja Barang dan Jasa
A. Upah Kerja
1 Pekerja 60.00 OH Rp 91,000.00 Rp 5,460,000.00
2 Tukang 21.00 OH Rp 133,000.00 Rp 2,793,000.00
3 Kepala Tukang 6.00 OH Rp 162,000.00 Rp 972,000.00
Sub Total Rp 9,225,000.00
B. Belanja Alat
1 Sewa Alat
Cangkul 3.00 bh Rp 85,000.00 Rp 255,000.00
Kereta Sorong 1.00 bh Rp 405,215.00 Rp 405,215.00
Sendok Semen 2.00 bh Rp 40,000.00 Rp 80,000.00
Raskam 2.00 bh Rp 20,000.00 Rp 40,000.00
Skop 2.00 bh Rp 75,000.00 Rp 150,000.00
Timba Cor 8.00 bh Rp 15,000.00 Rp 120,000.00
2 Belanja Papan Kegiatan dan Prasasti 1.00 Ls Rp 800,000.00 Rp 800,000.00
Sub Total Rp 1,850,215.00
C. Honorarium Pengadaan Barang / Jasa di Desa
1 Operasional TPK
- Penanggung Jawab 1.00 Ls Rp 750,000.00 Rp 750,000.00
- Ketua 1.00 Ls Rp 600,000.00 Rp 600,000.00
- Anggota 2.00 Ls Rp 400,000.00 Rp 800,000.00
2 Biaya Tenaga Ahli Perencanaan Insfrastruktur (RAB/GAMBAR) 1.00 Ls Rp 600,000.00 Rp 600,000.00
3 Biaya Tenaga Ahli Pemeriksaan Insfrastruktur / Fisik 1.00 Ls Rp 451,785.00 Rp 451,785.00
4 Biaya Dokumentasi 1.00 Ls Rp 100,000.00 Rp 100,000.00
Sub Total 3,301,785.00
JUMLAH TOTAL #REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
KABUPATEN : ACEH TENGAH JENIS PRASARANA : DRAINASE 60/40
KECAMATAN : JAGONG JEGET TAKE OF SHEET LOKASI : DUSUN SIDA MULYA
DESA : GEGARANG VOLUME : 12 m
1. Dimensi Saluran
L1 L2 T1 P
1.00 m 1.00 m 0.80 m 12.00 m
B1 T2 T3
B1 L2 B1 0.2 0.2 0.1
3. Volume Pasangan
Dinding : B1 x T1 + T2 x P x 2 = V1 m3
0.2 x 1.00 x 12.00 x 2 = 4.8 m3
Lantai : T2 x L1 x P = V2 m3
0.2 1.00 12.00 = 2.4 m3
Volume Total : V1 + V2 = Vtot m3
4.8 + 2.4 = 7.2 m3
Urugan Pasir Bawah Lantai
T3 L1 P = V m3
0.1 1.00 12.00 = 1.2 m3
4. Upah Galian
Analisa SNI-91-0006-2007 6.1 (1 m3 Galian tanah biasa sedalam 1 m)
Upah : V x Koef
Pekerja : 13.86 x 0.75 = 10.40 HOK
5. Analisa SNI DT-91-0008-2007 6.1 Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100)
Bahan : V x Koef
Kerikil : 7.1864 x 0.8 = 5.75 m3
Semen PC : 7.1864 x 8 = 57.49 Zak
Pasir Pasang : 7.1864 x 1 = 7.19 m3
Upah : V x Koef
Pekerja : 7.1864 x 1.65 = 11.86 HOK
Tukang : 7.1864 x 0.275 = 1.98 HOK
Bahan : V x Koef
Semen PC : 36.00 x 0.156 = 5.62 Zak
Pasir Pasang : 36.00 x 0.024 = 0.86 m3
Upah : V x Koef
Pekerja : 36.00 x 0.12 = 4.32 HOK
Tukang : 36.00 x 0.1 = 3.60 HOK
Kepala Tukang : 36.00 x 0.015 = 0.54 HOK
2. KEGIATAN #REF!
RINCIAN PENDANAAN
HARGA SATUAN
NO URAIAN VOLUME SATUAN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6
I Belanja Modal
Semen #REF! Zak Rp 70,000.00 #REF!
Pasir Pasang #REF! m3 Rp 165,000.00 #REF!
Keramik 60 x 60 80.00 Dus Rp 200,000.00 Rp 16,000,000.00
Keramik 30 x 30 15.00 Dus Rp 110,000.00 Rp 1,650,000.00
Kayu 2/2 100.00 btg Rp 40,000.00 Rp 4,000,000.00
Paku 10.00 kg Rp 21,000.00 Rp 210,000.00
Tripleks 4 mm 49.00 Lbr Rp 85,000.00 Rp 4,165,000.00
Pintu P1 Lengkap Terpasang 1.00 Unit Rp 2,700,000.00 Rp 2,700,000.00
Pintu P2 Lengkap Terpasang 1.00 Unit Rp 1,800,000.00 Rp 1,800,000.00
Pintu Lipat Besi P3 Lengkap Terpasang 1.00 Unit Rp 10,000,000.00 Rp 10,000,000.00
Jendela J1 Lengkap Terpasang 4.00 Unit Rp 1,300,000.00 Rp 5,200,000.00
Kusen + Ventilasi V1 Lengkap Terpasang 1.00 Unit Rp 350,000.00 Rp 350,000.00
Lampu SL 36 watt 16.00 bh Rp 95,000.00 Rp 1,520,000.00
Stop Kontak 6.00 bh Rp 25,000.00 Rp 150,000.00
Saklar Tunggal 2.00 bh Rp 25,000.00 Rp 50,000.00
Saklar Triple 2.00 bh Rp 40,000.00 Rp 80,000.00
MCB 1.00 bh Rp 100,000.00 Rp 100,000.00
Box Panel 1.00 bh Rp 130,000.00 Rp 130,000.00
Instalasi Titik Lampu + Aksesoris terpasang 16.00 bh Rp 150,000.00 Rp 2,400,000.00
Pemasukan Arus Listrik 6 A 1.00 Unit Rp 3,800,000.00 Rp 3,800,000.00
Bak Fiber 1.00 bh Rp 350,000.00 Rp 350,000.00
Klosed Jongkok 1.00 bh Rp 450,000.00 Rp 450,000.00
Cat Tembok 125.00 Kg Rp 65,000.00 Rp 8,125,000.00
Cat Minyak 30.00 Kg Rp 70,000.00 Rp 2,100,000.00
Pagar Hollow Pengaman Lantai II 30.35 M2 Rp 600,000.00 Rp 18,210,000.00
Pagar Hollow Pengaman Tangga 6.12 M2 Rp 600,000.00 Rp 3,672,000.00
Sub Total #REF!
II Belanja Barang dan Jasa
A. Upah Kerja
1 Pekerja #REF! OH Rp 91,000.00 #REF!
2 Tukang #REF! OH Rp 133,000.00 #REF!
3 Kepala Tukang #REF! OH Rp 162,000.00 #REF!
Sub Total #REF!
B. Belanja Alat
1 Sewa Alat
Cangkul 2.00 bh Rp 85,000.00 Rp 170,000.00
Kereta Sorong 1.00 bh Rp 400,000.00 Rp 400,000.00
Sendok Semen 2.00 bh Rp 40,000.00 Rp 80,000.00
Raskam 2.00 bh Rp 20,000.00 Rp 40,000.00
Skop 1.00 bh Rp 75,000.00 Rp 75,000.00
Timba Cor 11.00 bh Rp 15,000.00 Rp 165,000.00
2 Belanja Papan Kegiatan dan Prasasti 1.00 Ls Rp 800,000.00 Rp 800,000.00
Sub Total Rp 1,730,000.00
C. Honorarium Pengadaan Barang / Jasa di Desa
1 Operasional TPK
- Penanggung Jawab 1.00 Ls Rp 1,100,000.00 Rp 1,100,000.00
- Ketua 1.00 Ls Rp 850,000.00 Rp 850,000.00
- Anggota 2.00 Ls Rp 500,000.00 Rp 1,000,000.00
2 Biaya Tenaga Ahli Perencanaan Insfrastruktur (RAB/GAMBAR) 1.00 Ls Rp 3,000,000.00 Rp 3,000,000.00
3 Biaya Tenaga Ahli Pemeriksaan Insfrastruktur / Fisik 1.00 Ls Rp 2,100,000.00 Rp 2,100,000.00
4 Biaya Dokumentasi 1.00 Ls Rp 100,000.00 Rp 100,000.00
Sub Total Rp 8,150,000.00
JUMLAH TOTAL #REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
PROGRAM DANA DESA
KECAMATAN GAJAH PUTIH
KABUPATEN BENER MERIAH
PROVINSI ACEH
Tahun Anggaran
2020
RENCANA ANGGARAN BIAYA
KAMPUNG TIMANG GAJAH
TAHUN ANGGARAN 2020
HARGA SATUAN
NO URAIAN VOLUME SATUAN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6
I Belanja Modal
Semen 357.00 Zak Rp 70,000.00 Rp 24,990,000.00
Pasir Pasang 56.00 m3 Rp 185,000.00 Rp 10,360,000.00
Kerikil 60.00 m3 Rp 145,000.00 Rp 8,700,000.00
Papan Mal 60.00 Kpg Rp 65,000.00 Rp 3,900,000.00
Kayu 2/2 16.00 Btg Rp 45,000.00 Rp 720,000.00
Belanja Papan Kegiatan 1.00 Ls Rp 300,000.00 Rp 300,000.00
Batu Prasasti 1.00 Ls Rp 500,000.00 Rp 500,000.00
sarung tangan 2.00 bh Rp 5,000.00 Rp 10,000.00
Paku 4.00 kg Rp 25,000.00 Rp 100,000.00
Sub Total Rp 49,580,000.00
II Belanja Barang dan Jasa
A. Upah Kerja
1 Pekerja 204.00 OH Rp 90,000.00 Rp 18,360,000.00
2 Tukang 69.00 OH Rp 125,000.00 Rp 8,625,000.00
3 Kepala Tukang 22.00 OH Rp 150,000.00 Rp 3,300,000.00
4 Ongkos Langsir 14.00 OH Rp 150,000.00 Rp 2,100,000.00
Sub Total Rp 32,385,000.00
JUMLAH TOTAL 81,965,000.00
Timang Gajah,............2020
Disetujui Oleh : Direncanakan Oleh:
Kepala desa Timang Gajah Banta Kampung Timang Gajah Tenaga Ahli Penyusun RAB & Gambar
L1
T1
4 Analisa SNI DT-91-0008-2007 6.1 Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100)
Bahan : V x Koef
Kerikil : 40.5 x 0.74 = 29.97 m3
Semen PC : 40.5 x 4 = 162.00 Zak
Pasir Pasang : 40.5 x 0.621 = 25.15 m3
Upah : V x Koef
Pekerja : 40.5 x 2 = 81.00 HOK
Tukang : 40.5 x 0.875 = 35.44 HOK
Kepala Tukang : 40.5 x 0.453 = 18.35 HOK
6 Analisa PB. SNI : A.4.1.1.5 Membuat beton mutu f' c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c=0,66
Bahan : V x Koef
Kerikil : 1.20 x 0.44 = 0.53 m3
Semen PC : 1.20 x 3.52 = 4.22 Zak
Pasir Pasang : 1.20 x 0.57 = 0.68 m3
=
Upah : V x Koef
Pekerja : 1.20 x 1.20 = 1.44 HOK
Tukang : 1.20 x 5.50 = 6.60 HOK
kepala Tukang : 1.20 x 2.00 = 2.40 HOK
7 Pembesian Jumlah x P x J
0 1 Dia. 8 : 1 x 4.00 x 40 = 160.00 m1
Dia. 12 : 15 x 4.00 x 1 = 60.00 m1
TOTAL DIA. 8 = 160.00 m1
TOTAL DIA. 12 = 60.00 m1
2. KEGIATAN #REF!
RINCIAN PENDANAAN
HARGA SATUAN
NO URAIAN VOLUME SATUAN JUMLAH HARGA (Rp)
(Rp)
1 2 3 4 5 6
I Belanja Modal
Semen 68.00 Zak #REF! #REF!
Pasir Pasang 15.00 m3 #REF! #REF!
Kerikil 2.00 m3 #REF! #REF!
Pipa Galvanis Dia. 3 Inchi 2.00 Btg Rp 1,000,000.00 Rp 2,000,000.00
Pipa Galvanis Dia. 2 1/2 Inchi 13.00 Btg Rp 510,000.00 Rp 6,630,000.00
Net Voly 1.00 Set Rp 1,000,000.00 Rp 1,000,000.00
Papan Mal 20.00 Kpg #REF! #REF!
Kayu 2/2 12.00 Btg Rp 40,000.00 Rp 480,000.00
Paku 6.00 kg #REF! #REF!
Sub Total #REF!
II Belanja Barang dan Jasa
A. Upah Kerja
1 Pekerja 14.00 OH Rp 91,000.00 Rp 1,274,000.00
2 Tukang 9.00 OH Rp 133,000.00 Rp 1,197,000.00
3 Kepala Tukang Err:509 OH Rp 162,000.00 Err:509
Sub Total Err:509
B. Belanja Sewa
1 Sewa Alat
Cangkul 1.00 bh Rp 85,000.00 Rp 85,000.00
Kereta Sorong 1.00 bh Rp 400,000.00 Rp 400,000.00
Sendok Semen 2.00 bh Rp 40,000.00 Rp 80,000.00
Raskam 2.00 bh Rp 20,000.00 Rp 40,000.00
Skop 2.00 bh Rp 75,000.00 Rp 150,000.00
Timba Cor 4.00 bh Rp 15,000.00 Rp 60,000.00
2 Belanja Papan Kegiatan dan Prasasti 1.00 Ls Rp 600,000.00 Rp 600,000.00
Sub Total Rp 1,415,000.00
C. Perencana, Pelaksana & Penerima Hasil Pekerjaan
1 Operasional TPK
- Penanggung Jawab 1.00 Ls Rp 750,000.00 Rp 750,000.00
- Ketua 1.00 Ls Rp 600,000.00 Rp 600,000.00
- Sekretaris 1.00 Ls Rp 500,000.00 Rp 500,000.00
- Anggota 1.00 Ls Rp 400,000.00 Rp 400,000.00
2 Biaya Tenaga Ahli (Penyusunan RAB/Gambar) 1.00 Ls Rp 800,000.00 Rp 800,000.00
3 Jasa Pengawasan 1.00 Ls Rp 395,000.00 Rp 395,000.00
4 Biaya Dokumentasi 1.00 Ls Rp 100,000.00 Rp 100,000.00
Sub Total 3,545,000.00
JUMLAH TOTAL Err:509
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
KABUPATEN : BENER MERIAH JENIS PRASARANA : RABAT BETON L = 2
KECAMATAN : TIMANG GAJAH TAKE OF SHEET LOKASI : BUKIT MULIE
DESA : BUKIT MULIE VOLUME 28.476 m3
L1
T1
5. Analisa SNI DT-91-0008-2007 6.1 Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100)
Bahan : V x Koef
Kerikil : 28.476 x 0.06 = 1.71 m3
Semen PC : 28.476 x 2.50 = 71.19 Zak
Pasir Pasang : 28.476 x 0.50 = 14.24 m3
Upah : V x Koef
Pekerja : 28.476 x 1.00 = 28.48 HOK
Tukang : 28.476 x 0.30 = 8.54 HOK