Anda di halaman 1dari 207

ANALISA BIAYA PEKERJAAN

INVESTASI DAN PEMELIHARAAN

1 . 1 Set dokumentasi menggunakan kamera digital


1.0000 h.o Tukang Foto Rp 138,000.00 Rp. 138,000.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 138,000.00
1.0000 bh CD copy soft File foto image Rp 6,500.00 Rp. 6,500.00
100.0000 lbr Foto printing Rp 800.00 Rp. 80,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 86,500.00
Rp. 224,500.00
Overhead + Profit (15%) Rp. 33,675.00
Jumlah Total Rp. 258,175.00
2 . 1 Set Pengadaan & Penggandaan laporan
0.0800 h.o Operator printer Rp 138,000.00 Rp. 11,040.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 11,040.00
50.0000 lbr Kertas HVS Rp 200.00 Rp. 10,000.00
0.5000 set Tinta printer Rp 45,000.00 Rp. 22,500.00
200.0000 lbr Foto copy Rp 250.00 Rp. 50,000.00
4.0000 bh Menjilid Rp 10,000.00 Rp. 40,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 122,500.00
Jumlah Total Rp. 133,540.00

3 . Pek. Administrasi & Dokumentasi


40.0000 minggu Dokumentasi Rp 224,500.00 Rp 8,980,000.00
40.0000 minggu Laporan Rp 133,540.00 Rp 5,341,600.00

4 . 1 m' Pagar sementara dari seng gelombang tinggi 2 meter


0.4000 h.o Pekerja Rp 118,000.00 Rp. 47,200.00
0.2000 h.o Tukang kayu Rp 138,000.00 Rp. 27,600.00
0.0200 h.o Kepala tukang Rp Rp. -
0.0200 h.o Mandor Rp Rp. -
Jumlah Upah Kerja . . . . . . . . . . Rp. 74,800.00
1.2500 btg Dolken kayu dia. 8 - 10/400 cm Rp Rp. -
0.0600 kg Paku biasa 2" - 5" Rp Rp. -
1.2000 lbr Seng Gelombang 180 x 90 x 5 BJLS 30 Rp Rp. -
0.4500 kg Meni besi Rp Rp. -
0.0120 m³ Kayu Kelas III Rp Rp. -
2.0000 m² Banner Rp Rp. -

Jumlah Total Rp. #REF!

5 . 1 m² Pembuatan Direksi keet


1.0000 h.o Pekerja Rp Rp. -
2.0000 h.o Tukang Rp Rp. -
0.2000 h.o Kepala tukang Rp Rp. -
0.0500 h.o Mandor Rp Rp. -
Jumlah Upah Kerja . . . . . . . . . . Rp. -
1.2500 btg Dolken kayu dia. 8 - 10/400 cm Rp Rp. -
0.1860 m³ Kayu Kelas III Rp Rp. -
0.3000 kg Paku biasa 2" - 5" Rp Rp. -
0.3600 sak Semen portland 50 kg Rp Rp. -
0.0300 m³ Pasir beton Rp Rp. -
0.0500 m³ Batu Koral / kerikil uk. 1-2 cm Rp Rp. -
1.5000 lbr Seng Gelombang 180 x 90 x 5 BJLS 30 Rp Rp. -
1.3500 lbr Multripleks 3 mm uk. 122 x 244 Rp Rp. -
Jumlah Biaya Bahan . . . . . . . . . . Rp. -

Jumlah Total Rp. -

6 . Perlengkapan Kantor (Meubelair, ATK,dll)


1.0000 bh Meja 1.2 x 1.2 m Rp Rp. -
12.0000 bh Kursi plastik setara lion star Rp Rp. -
1.0000 bh Meja uk 1.2 x 2.4 m Rp Rp. -
2.0000 bh White board uk. 1,2 x 0,8 m Rp Rp. -
2.0000 bh Papan tempel uk 3 x 0,8 m Rp Rp. -
12.0000 bh Meja kerja 1/2 biro Rp Rp. -
12.0000 bh Kursi kerja setara olympic Rp Rp. -
2.0000 bh Credenza Rp Rp. -
2.0000 bh Lemari Besi untuk Filing Rp Rp. -
2.0000 unit Printer A4 + copy Rp Rp. -
2.0000 unit Printer A3 setara CANON PIXMA iX6560 Rp Rp. -
2.0000 unit Laptop 14" setara Lenovo K4450 2242 Rp Rp. -
2.0000 set Alat Pemadam Kebakaran Portable (3 kg Co2) Rp Rp. -
1.0000 unit AC Split 1 PK Rp Rp. -
2.0000 unit AC Split 3/4 PK Rp Rp. -
1.0000 unit AC Split 1/2 PK Rp Rp. -
2.0000 set Perlengkapan sholat Rp Rp. -
Jumlah Total Rp. -

7 . 1 m² Gudang dan barak pekerja


0.1000 h.o Pekerja Rp Rp. -
1.0000 h.o Tukang Rp Rp. -
0.5000 h.o Kepala tukang Rp Rp. -
0.0050 h.o Mandor Rp Rp. -
Jumlah Upah Kerja . . . . . . . . . . Rp. -
0.0200 m³ Papan kayu Kelas III Rp Rp. -
0.0500 m³ Batu pecah Rp Rp. -
0.0300 m³ Pasir beton Rp Rp. -
1.0000 sak Semen portland 50 kg Rp Rp. -
0.3000 kg Paku biasa 2" - 5" Rp Rp. -
1.2000 lbr Seng Gelombang 180 x 90 x 5 BJLS 30 Rp Rp. -
0.1800 lbr Multripleks 9 mm uk. 122 x 244 Rp Rp. -
Jumlah Biaya Bahan . . . . . . . . . . Rp. -

Jumlah Total Rp. -

8 . Keselamatan dan kesehatan kerja (K3)


50.0000 bh Savety helmet Rp Rp. -
15.0000 set Harness Full body Rp Rp. -
50.0000 bh Savety jacket Rp Rp. -
25.0000 psg Rain Coat Rp Rp. -
20.0000 bh Savety Google Rp Rp. -
50.0000 psg Savety Shoes Rp Rp. -
10.0000 bh Masker Rp Rp. -
50.0000 psg Sarung tangan Rp Rp. -
5.0000 bh Poster keselamatan Rp Rp. -
2.0000 set First Aid Kit Rp Rp. -
2.0000 bh Papan pengumuman K3 Rp Rp. -
1.0000 ls Asuransi Rp Rp. -
Jumlah Total Rp. -

9 . 1 bh Papan nama proyek 80x120 cm


2.1000 h.o Pekerja Rp Rp. -
0.0175 h.o Tukang Batu Rp Rp. -
1.0000 h.o Tukang Kayu Rp Rp. -
1.0000 h.o Tukang Cat Rp Rp. -
1.0050 h.o Mandor Rp Rp. -
Jumlah Upah Kerja . . . . . . . . . . Rp. -
0.0350 m³ Kayu kelas III Rp Rp. -
1.4000 m' Plat seng tebal 0.050 cm lebar 0.90m Rp Rp. -
0.6000 kg Paku Rp Rp. -
1.5000 kg Cat Kayu Rp Rp. -
0.3360 sak Semen PC Rp Rp. -
0.0270 m³ Pasir beton Rp Rp. -
0.0405 m³ Koral/krikil Rp Rp. -
Jumlah Biaya Bahan . . . . . . . . . . Rp. -

Jumlah Total Rp. -


A. PEKERJAAN TANAH

1. 1 m3 Galian tanah biasa sedalam 1 meter


0.500 h.o pekerja Rp 118,000.00 Rp. 59,000.00
0.050 ho mandor Rp 163,000.00 Rp. 8,150.00
. . . . . . . . . . Rp. 67,150.00
Overhead + Profit (15%) Rp. 10,072.50
Jumlah Total Rp. 77,222.50

2. 1 m3 Galian tanah biasa sedalam 2 meter


0.6575 h.o pekerja Rp 118,000.00 Rp. 77,585.00
0.0650 h.o mandor Rp 163,000.00 Rp. 10,595.00
Jumlah Total . . . . . . . . . . Rp. 88,180.00

3. 1 m3 Galian tanah biasa sedalam 3 meter


0.9188 h.o pekerja Rp 118,000.00 Rp. 108,412.50
0.0913 h.o mandor Rp 163,000.00 Rp. 14,873.75
Jumlah Total . . . . . . . . . . Rp. 123,286.25
4. 1 m3 Galian tanah keras sedalam 1 meter
0.8125 h.o pekerja Rp 118,000.00 Rp. 95,875.00
0.0775 h.o mandor Rp 163,000.00 Rp. 12,632.50
Jumlah Total . . . . . . . . . . Rp. 108,507.50
5. 1 m3 Galian tanah lumpur sedalam 1 meter
0.8230 h.o pekerja Rp 118,000.00 Rp. 97,114.00
0.0830 h.o mandor Rp 163,000.00 Rp. 13,529.00
Jumlah Total . . . . . . . . . . Rp. 110,643.00

6. 1 m3 Galian tanah cadas sedalam 1 meter


1.2500 h.o pekerja Rp 118,000.00 Rp. 147,500.00
0.1250 h.o mandor Rp 163,000.00 Rp. 20,375.00
Jumlah Total . . . . . . . . . . Rp. 167,875.00
7. 1 m3 Pembuangan tanah sampai dengan sejauh 150 meter
0.5160 h.o pekerja Rp 118,000.00 Rp. 60,888.00
0.0500 h.o mandor Rp 163,000.00 Rp. 8,150.00
Jumlah Total . . . . . . . . . . Rp. 69,038.00
8. 1 m3 Urugan pasir
0.3000 h.o pekerja Rp 118,000.00 Rp. 35,400.00
0.0100 h.o mandor Rp 163,000.00 Rp. 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 37,030.00
1.2000 m3 pasir urug Rp 84,000.00 Rp. 100,800.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 100,800.00
Rp. 137,830.00
Overhead + Profit (15%) Rp. 20,674.50
Jumlah Total Rp. 158,504.50

9. 1 m3 Urugan sirtu
0.2500 h.o pekerja Rp 118,000.00 Rp. 29,500.00
0.0250 h.o mandor Rp 163,000.00 Rp. 4,075.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 33,575.00
1.2000 m 3
sirtu Rp 116,000.00 Rp. 139,200.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 139,200.00
Rp. 172,775.00
Overhead + Profit (15%) Rp. 25,916.25
Jumlah Total Rp. 198,691.25
10. 1m3 Urugan kembali
0.5000 h.o pekerja Rp 118,000.00 Rp. 59,000.00
0.0500 h.o mandor Rp 163,000.00 Rp. 8,150.00
Jumlah Total . . . . . . . . . . Rp. 67,150.00
Overhead + Profit (15%) Rp. 10,072.50
Jumlah Total Rp. 77,222.50

11. 1 m3 Memindahkan dan meratakan tanah menggunakan bulldozer


0.0016 h.a Sewa bulldozer Rp - Rp -
0.3365 ltr Solar Rp 7,000.00 Rp 2,355.56
0.0187 ltr Pelumas Rp 15,000.00 Rp 279.76
0.0004 kg Grease Rp 50,000.00 Rp 19.84
0.0016 h.o Operator Rp 163,000.00 Rp 258.73
Jumlah Total . . . . . . . . . . Rp. 2,913.89

12. 1 m3 Mengeruk/leveling tanah menggunakan dozer shovel


0.0015 h.a Sewa shovel Rp - Rp -
0.3216 ltr Solar Rp 7,000.00 Rp 2,251.49
0.0175 ltr Pelumas Rp 15,000.00 Rp 263.06
0.0004 kg Grease Rp 50,000.00 Rp 18.66
0.0015 h.o Operator Rp 163,000.00 Rp 243.28
Jumlah Total . . . . . . . . . . Rp. 2,776.49

13. 1 m3 Mengeruk tanah menggunakan excavator hidraulic


0.0015 h.a Sewa excavator Rp - Rp -
0.3241 ltr Solar Rp 7,000.00 Rp 2,268.42
0.0177 ltr Pelumas Rp 15,000.00 Rp 265.04
0.0004 kg Grease Rp 50,000.00 Rp 18.80
0.0015 h.o Operator Rp 163,000.00 Rp 245.11
Jumlah Total . . . . . . . . . . Rp. 2,797.37

14. 1 m3 Memindahkan dan meratakan tanah menggunakan loader (bucket 1,7 m3)
0.0019 h.a Sewa loader Rp - Rp -
0.4038 ltr Solar Rp 7,000.00 Rp 2,826.67
0.0224 ltr Pelumas Rp 15,000.00 Rp 335.71
0.0005 kg Grease Rp 50,000.00 Rp 23.81
0.0019 h.o Operator Rp 163,000.00 Rp 310.48
Jumlah Total . . . . . . . . . . Rp. 3,496.67

15. 1 m3 Pengangkutan tanah menggunakan dump truck (Jarak angkut sampai dengan 1 km)
0.0187 h.a Sewa loader Rp - Rp -
3.9626 ltr Solar Rp 7,000.00 Rp 27,738.32
0.2196 ltr Pelumas Rp 15,000.00 Rp 3,294.39
0.0047 kg Grease Rp 50,000.00 Rp 233.64
0.0187 h.o Operator Rp 163,000.00 Rp 3,046.73
Jumlah Total . . . . . . . . . . Rp. 34,313.08

16. 1 m3 Air untuk pembasahan tanah menggunakan tangki air dengan pompa (jarak angkut + 10 km)
0.0800 h.a Sewa truk tangki air Rp - Rp -
17.2400 ltr Solar Rp 7,000.00 Rp 120,680.00
0.9400 ltr Pelumas Rp 15,000.00 Rp 14,100.00
0.0200 kg Grease Rp 50,000.00 Rp 1,000.00
0.0800 h.o Operator Rp 163,000.00 Rp 13,040.00
Jumlah Total . . . . . . . . . . Rp. 148,820.00
B. PEKERJAAN PERKERASAN JALAN DAN LAPANGAN PENUMPUKAN
1. 1 m3 Lapis Pondasi Atas Agregat/Batu Pecah Kelas A (menggunakan alat)
Asumsi : a) Menggunakan alat berat (150 m3/hari)
b) Material ditimbun sepanjang area proyek oleh pemasok/supplier
c) Dihampar dan dipadatkan sampai tebal padat 15 cm dan 1000 m2/hari, koefisien pemadatan = 1,2
d) Gradasi bahan LPA kelas A semua harus lolos saringan 75 mm

0.0600 h.o pekerja Rp 118,000.00 Rp. 7,080.00


0.0200 h.o operator/supir Rp - Rp. -
0.0067 h.o mandor Rp 163,000.00 Rp. 1,086.67
Jumlah Upah Kerja . . . . . . . . . . Rp. 8,166.67

0.3400 m3 Pasir urug Rp 84,000.00 Rp. 28,560.00


0.8600 m3 Batu pecah Rp 450,000.00 Rp. 387,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 415,560.00

0.0067 h.a Motor grader 100HP Rp - Rp. -


0.0067 h.a Mesin gilas 3 roda 6-8ton Rp - Rp. -
0.0067 h.a Truk tanki air 115HP Rp - Rp. -
0.0016 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 423,726.67

2. 1 m3 Lapis Pondasi Atas Agregat/Batu Pecah Kelas A (manual)


Asumsi : a) Menggunakan tenaga manusia (1 m3/hari)
b) Material ditimbun sepanjang area proyek oleh pemasok/supplier
c) Dihampar dan dipadatkan sampai tebal padat 10 cm dan 600 m2/hari, koefisien pemadatan = 1,2
d) Gradasi bahan LPA kelas A semua harus lolos saringan 75 mm

1.0333 h.o pekerja Rp 118,000.00 Rp. 121,933.33


0.0333 h.o operator/supir Rp - Rp. -
0.0333 h.o mandor Rp 163,000.00 Rp. 5,433.33
Jumlah Upah Kerja . . . . . . . . . . Rp. 127,366.67

0.3417 m3 Pasir urug Rp 84,000.00 Rp. 28,700.00


0.8583 m3 Batu pecah Rp 450,000.00 Rp. 386,250.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 414,950.00

0.0167 h.a Mesin gilas 3 roda 6-8ton Rp - Rp. -


0.0167 h.a Truk tanki air 115HP Rp - Rp. -
0.0040 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 542,316.67

3. 1 m3 Lapis Pondasi Bawah Sirtu (menggunakan alat)


Asumsi : a) Menggunakan alat berat (150 m3/hari)
b) Material ditimbun sepanjang area proyek oleh pemasok/supplier
c) Dihampar dan dipadatkan sampai tebal padat 15 cm dan 1000 m2/hari, koefisien pemadatan = 1,2
d) 6% sirtu dengan ukuran lebih dipisahkan saat penghamparan menggunakan grader

0.0600 h.o pekerja Rp 118,000.00 Rp. 7,080.00


0.0200 h.o operator/supir Rp - Rp. -
0.0067 h.o mandor Rp 163,000.00 Rp. 1,086.67
Jumlah Upah Kerja . . . . . . . . . . Rp. 8,166.67

1.2733 m3 Sirtu Rp 116,000.00 Rp. 147,706.67


Jumlah Biaya Bahan . . . . . . . . . . Rp. 147,706.67

0.0067 h.a Motor grader 100HP Rp - Rp. -


0.0067 h.a Mesin gilas 3 roda 6-8ton Rp - Rp. -
0.0067 h.a Truk tanki air 115HP Rp - Rp. -
0.0016 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 155,873.33


4. 1 m3 Lapis Pondasi Bawah Sirtu (manual)
Asumsi : a) Menggunakan tenaga manusia (1 m3/hari)
b) Material ditimbun sepanjang area proyek oleh pemasok/supplier
c) Dihampar dan dipadatkan sampai tebal padat 10 cm dan 600 m2/hari, koefisien pemadatan = 1,2
d) Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat.

1.0333 h.o pekerja Rp 118,000.00 Rp. 121,933.33


0.0333 h.o operator/supir Rp - Rp. -
0.0333 h.o mandor Rp 163,000.00 Rp. 5,433.33
Jumlah Upah Kerja . . . . . . . . . . Rp. 127,366.67

1.2000 m3 Pasir urug Rp 84,000.00 Rp. 100,800.00


Jumlah Biaya Bahan . . . . . . . . . . Rp. 100,800.00

0.0167 h.a Mesin gilas 3 roda 6-8ton Rp - Rp. -


0.0167 h.a Truk tanki air 115HP Rp - Rp. -
0.0040 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 228,166.67

5 1 m3 Lapis Penetrasi/Pondasi Atas Macadam tebal 7 cm (manual)

Asumsi : a) Menggunakan tenaga manusia


b) Material dikirim ke lokasi proyek oleh pemasok/supplier
c) Tebal total perkerasan 7 cm
d) Kapasitas penghamparan 2000 m2/minggu (6 hari).

3.0429 h.o pekerja Rp 118,000.00 Rp. 359,057.13


0.1286 h.o operator/supir Rp - Rp. -
0.0857 h.o mandor Rp 163,000.00 Rp. 13,971.43
Jumlah Upah Kerja . . . . . . . . . . Rp. 373,028.55

0.8929 m3 Batu pecah 3-5 cm Rp 450,000.00 Rp. 401,785.71


0.2381 m3 Batu pecah 2-3 cm Rp 450,000.00 Rp. 107,164.29
0.2041 m3 Batu pecah 1-2 cm Rp 260,000.00 Rp. 53,077.14
0.1587 m3 Pasir beton Rp 165,000.00 Rp. 26,187.86
78.5714 kg Aspal Rp 15,000.00 Rp. 1,178,571.43
Jumlah Biaya Bahan . . . . . . . . . . Rp. 1,766,786.43

0.0429 h.a Truk bak terbuka 3,5 ton/115HP Rp - Rp. -


0.0429 h.a Mesin gilas 3 roda 6-8ton Rp - Rp. -
0.0429 h.a Mesin penyemprot aspal 400 ltr Rp - Rp. -
0.1131 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 2,139,814.98


6. 1 m2 Penghamparan Lapis Tipis Aspal Pasir tebal padat 2 cm (menggunakan alat)
Asumsi : a) Menggunakan alat berat 1750 m2/hari
b) Pasir aspal dikirim ke lokasi proyek oleh pemasok/supplier dari AMP
c) Berat jenis 1,9 ton/m3, tebal padat rata-rata 2 cm
d) Lapis tack/pengikat aspal cutback dihampar @ 0,5 ltr/m2

0.0069 h.o pekerja Rp 118,000.00 Rp. 809.14


0.0023 h.o operator/supir Rp - Rp. -
0.0006 h.o mandor Rp 163,000.00 Rp. 93.14
Jumlah Upah Kerja . . . . . . . . . . Rp. 902.29

0.0377 ton Hotmix LATASIR Rp - Rp. -


0.4000 kg Aspal Rp 15,000.00 Rp. 6,000.00
0.1000 ltr Minyak Bakar Rp 9,000.00 Rp. 900.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 6,900.00

0.0006 h.a Mesin gilas tandem 6-10 ton Rp - Rp. -


0.0006 h.a Mesin gilas roda karet 8-15 ton Rp - Rp. -
0.0006 h.a Mesin penyemprot aspal 1000ltr Rp - Rp. -
0.0006 h.a Mesin penghampar 1820mm/30HP Rp - Rp. -
0.0006 h.a Kompressor 210 m3/jam Rp - Rp. -
0.0001 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 7,802.29


7. 1 m2 Penghamparan Lapis Tipis Aspal Pasir tebal padat 2 cm (manual)
Asumsi : a) Menggunakan tenaga manusia 1600 m2/hari
b) Pasir aspal dikirim ke lokasi proyek oleh pemasok/supplier dari AMP
c) Berat jenis 1,9 ton/m3, tebal padat rata-rata 2 cm
d) Lapis tack/pengikat aspal cutback dihampar @ 0,5 ltr/m2

0.0113 h.o pekerja Rp 118,000.00 Rp. 1,327.50


0.0025 h.o operator/supir Rp - Rp. -
0.0006 h.o mandor Rp 163,000.00 Rp. 101.88
Jumlah Upah Kerja . . . . . . . . . . Rp. 1,429.38

0.0375 ton Hotmix LATASIR Rp - Rp. -


0.4000 kg Aspal Rp 15,000.00 Rp. 6,000.00
0.1000 ltr Minyak Bakar Rp 9,000.00 Rp. 900.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 6,900.00
0.0006 h.a Mesin gilas tandem 6-10 ton Rp - Rp. -
0.0006 h.a Mesin gilas roda karet 8-15 ton Rp - Rp. -
0.0006 h.a Mesin penyemprot aspal 400ltr Rp - Rp. -
0.0006 h.a Truk bak terbuka 3,5 ton/115 HP Rp - Rp. -
0.0003 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 8,329.38

8. 1 m2 Penghamparan Lapis Tipis Asbuton & Agregat halus tebal padat 3 cm (manual)
Asumsi : a) Menggunakan tenaga manusia (750 m2/hari)
b) Lasbutag dikirim ke lokasi proyek oleh pemasok/supplier
c) Lasbutag dihampar @ 16,7 m2/ton dengan tebal padat 3 cm
d) Lapis tack/pengikat aspal cutback dihampar @ 0,5 ltr/m2

0.0293 h.o pekerja Rp 118,000.00 Rp. 3,461.33


0.0040 h.o operator/supir Rp - Rp. -
0.0013 h.o mandor Rp 163,000.00 Rp. 217.33
Jumlah Upah Kerja . . . . . . . . . . Rp. 3,678.67

0.0600 ton Coldmix LASBUTAG Rp - Rp. -


0.4000 kg Aspal Rp 15,000.00 Rp. 6,000.00
0.1000 ltr Minyak Bakar Rp 9,000.00 Rp. 900.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 6,900.00

0.0013 h.a Mesin gilas tandem 6-10 ton Rp - Rp. -


0.0013 h.a Mesin gilas roda karet 8-15 ton Rp - Rp. -
0.0013 h.a Mesin penyemprot aspal 400ltr Rp - Rp. -
0.0013 h.a Truk bak terbuka 3,5 ton/115 HP Rp - Rp. -
0.0009 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 10,578.67

9. 1 m2 Penghamparan Lapis Tipis Asbuton & Pasir tebal padat 3 cm (menggunakan alat)
Asumsi : a) Menggunakan alat berat (1500 m2/hari)
b) Latasbusir dikirim ke lokasi proyek oleh pemasok/supplier dari AMP
c) Berat jenis Latasbusir 2 ton/m3, tebal padat rata-rata 3 cm
d) Lapis tack/pengikat aspal cutback dihampar @ 0,5 ltr/m2

0.0160 h.o pekerja Rp 118,000.00 Rp. 1,888.00


0.0027 h.o operator/supir Rp - Rp. -
0.0007 h.o mandor Rp 163,000.00 Rp. 108.67
Jumlah Upah Kerja . . . . . . . . . . Rp. 1,996.67

0.0600 ton Coldmix LATASBUSIR Rp - Rp. -


0.4000 kg Aspal Rp 15,000.00 Rp. 6,000.00
0.1000 ltr Minyak Bakar Rp 9,000.00 Rp. 900.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 6,900.00

0.0007 h.a Mesin gilas tandem 6-10 ton Rp - Rp. -


0.0007 h.a Mesin gilas roda karet 8-15 ton Rp - Rp. -
0.0007 h.a Mesin penyemprot aspal 1000ltr Rp - Rp. -
0.0007 h.a Mesin penghampar 1820mm/30HP Rp - Rp. -
0.0007 h.a Kompressor 210 m3/jam Rp - Rp. -
0.0003 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 8,896.67


10. 1 m2 Penghamparan Lapis Tipis Aspal Beton tebal padat 3 cm (menggunakan alat)
Asumsi : a) Menggunakan alat berat (1500 m2/hari)
b) Hot Rolled Sheet (HRS ) / Lataston dikirim ke lokasi proyek oleh pemasok/supplier dari AMP
c) Berat jenis Lataston 2,2 ton/m3, tebal padat rata-rata 3 cm
d) Lapis tack/pengikat aspal cutback dihampar @ 0,5 ltr/m2
0.0160 h.o pekerja Rp 118,000.00 Rp. 1,888.00
0.0027 h.o operator/supir Rp - Rp. -
0.0007 h.o mandor Rp 163,000.00 Rp. 108.67
Jumlah Upah Kerja . . . . . . . . . . Rp. 1,996.67
0.0667 ton H.R.S (LATASTON) Rp 1,490,000.00 Rp. 99,333.33
0.4000 kg Aspal Rp 15,000.00 Rp. 6,000.00
0.1000 ltr Minyak Bakar Rp 9,000.00 Rp. 900.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 106,233.33

0.0007 h.a Mesin gilas tandem 6-10 ton Rp - Rp. -


0.0007 h.a Mesin gilas roda karet 8-15 ton Rp - Rp. -
0.0007 h.a Mesin penyemprot aspal 1000ltr Rp - Rp. -
0.0007 h.a Mesin penghampar 1820mm/30HP Rp - Rp. -
0.0007 h.a Kompressor 210 m3/jam Rp - Rp. -
0.0003 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 108,230.00

11. 1 m2 Penghamparan Lapis Tipis Aspal Dan Agregat Halus tebal padat 3 cm (manual)
Asumsi : a) Menggunakan tenaga manusia (1500 m2/hari)
b) Latasag dikirim ke lokasi proyek oleh pemasok/supplier dari AMP
c) Berat jenis padat 2 ton/m3, tebal padat rata-rata 3 cm
d) Lapis tack/pengikat aspal cutback dihampar @ 1 ltr/m2
e) Cutback bitumen dipanaskan dalam mesin penyemprot aspal

0.0213 h.o pekerja Rp 118,000.00 Rp. 2,517.33


0.0020 h.o operator/supir Rp - Rp. -
0.0007 h.o mandor Rp 163,000.00 Rp. 108.67
Jumlah Upah Kerja . . . . . . . . . . Rp. 2,626.00

0.0600 ton Coldmix LATASAG Rp 14,000,000.00 Rp. 840,000.00


0.4000 kg Aspal Rp 15,000.00 Rp. 6,000.00
0.1000 ltr Minyak Bakar Rp 9,000.00 Rp. 900.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 846,900.00

0.0007 h.a Mesin gilas 3 roda 6-8ton Rp - Rp. -


0.0007 h.a Mesin gilas roda karet 8-15 ton Rp - Rp. -
0.0007 h.a Mesin penyemprot aspal 400ltr Rp - Rp. -
0.0007 h.a Truk bak terbuka 3,5 ton/115 HP Rp - Rp. -
0.0007 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 849,526.00

12. 1 m2 Penghamparan Lapis Aspal Beton tebal padat 5 cm (menggunakan alat)


Asumsi : a) Menggunakan alat berat (900 m2/hari)
b) Hotmis laston dikirim ke lokasi proyek oleh pemasok/supplier dari AMP
c) Berat jenis padat 2,25 ton/m3, tebal padat rata-rata 5 cm
d) Lapis tack/pengikat aspal cutback dihampar @ 0,5 ltr/m2

0.0333 h.o pekerja Rp 118,000.00 Rp. 3,933.33


0.0056 h.o operator/supir Rp - Rp. -
0.0011 h.o mandor Rp 163,000.00 Rp. 181.11
Jumlah Upah Kerja . . . . . . . . . . Rp. 4,114.44

0.1111 ton Hotmix Aspal beton (LASTON) Rp - Rp. -


0.0010 m3 Pasir beton Rp 165,000.00 Rp. 165.00
0.4000 kg Aspal Rp 15,000.00 Rp. 6,000.00
0.1000 ltr Minyak Bakar Rp 9,000.00 Rp. 900.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 7,065.00

0.0011 h.a Mesin gilas 3 roda 6-8ton Rp - Rp. -


0.0011 h.a Mesin gilas tandem 6-10ton Rp - Rp. -
0.0011 h.a Mesin gilas roda karet 8-15 ton Rp - Rp. -
0.0011 h.a Mesin penyemprot aspal 1000ltr Rp - Rp. -
0.0011 h.a Mesin penghampar 1820mm/30HP Rp - Rp. -
0.0011 h.a Kompressor 210 m3/jam Rp - Rp. -
0.0005 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 11,179.44


13. 1 m2 Perbaikan Lubang Jalan Aspal (manual) kedalaman rata-rata 10 cm
Asumsi : a) Termasuk pengadaan material
b) Rata-rata hasil kerja kelompok 35 m2/hari
c) Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
0.3143 h.o pekerja Rp 118,000.00 Rp. 37,085.71
0.0286 h.o operator/supir Rp - Rp. -
0.0286 h.o mandor Rp 163,000.00 Rp. 4,657.14
Jumlah Upah Kerja . . . . . . . . . . Rp. 41,742.86
0.1143 m3 Batu pecah Rp 450,000.00 Rp. 51,428.57
0.0143 m3 Pasir beton Rp 165,000.00 Rp. 2,357.14
0.5000 kg Aspal Rp 15,000.00 Rp. 7,500.00
0.5000 ltr Minyak Bakar Rp 9,000.00 Rp. 4,500.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 65,785.71

0.0286 h.a Mesin gilas bergetar 1 ton Rp - Rp. -


0.0286 h.a Mesin penyemprot aspal 400ltr Rp - Rp. -
0.0286 h.a Truk bak terbuka 3,5 ton/115 HP Rp - Rp. -
0.0091 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 107,528.57

14. 1 m2 Perbaikan Ambles/Penurunan Jalan Aspal (manual)


Asumsi : a) Pengadaan agregat ke lokasi proyek oleh pemasok/supplier
b) Asumsi terjadi keruntuhan tanah dasar, gali sampai kedalaman 40 cm
c) Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat, kapasitas kerja kelompok 20 m2/hari
d) Truk membuang kelebihan tanah yang tidak dikehendaki sejauh 1 km
e) 20% dari lapis perkerasan yang ada dapat digunakan lagi.

1.0000 h.o pekerja Rp 118,000.00 Rp. 118,000.00


0.0500 h.o operator/supir Rp - Rp. -
0.0500 h.o mandor Rp 163,000.00 Rp. 8,150.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 126,150.00

0.3600 m3 Batu pecah Rp 450,000.00 Rp. 162,000.00


0.0400 m3 Pasir beton Rp 165,000.00 Rp. 6,600.00
0.5000 kg Aspal Rp 15,000.00 Rp. 7,500.00
0.5000 ltr Minyak Bakar Rp 9,000.00 Rp. 4,500.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 180,600.00

0.0500 h.a Mesin gilas bergetar 1 ton Rp - Rp. -


0.0500 h.a Stamper 4 HP Rp - Rp. -
0.0500 h.a Mesin penyemprot aspal 400ltr Rp - Rp. -
0.0500 h.a Truk bak terbuka 3,5 ton/115 HP Rp - Rp. -
0.0320 set Alat bantu (set @ 3 alat) Rp - Rp. -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 306,750.00

15. 1 m2 Pemasangan paving block


0.1480 h.o pekerja Rp 118,000.00 Rp. 17,464.00
0.2960 h.o tukang paving Rp 138,000.00 Rp. 40,848.00
0.0296 h.o kepala tukang Rp 143,000.00 Rp. 4,232.80
0.0074 h.o mandor Rp 163,000.00 Rp. 1,206.20
Jumlah Upah Kerja . . . . . . . . . . Rp. 63,751.00
1.0000 m2 Paving block K- 225 Rp 110,500.00 Rp. 110,500.00
0.0600 m3 Pasir urug tebal padat 5cm Rp 84,000.00 Rp. 5,040.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 115,540.00

0.0200 h.a Sewa Tamper/Baby roller Rp - Rp. -


Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah total Rp. 179,291.00

1 m' Pasang Kansteen beton


0.1000 h.o Pekerja Rp 118,000.00 Rp. 11,800.00
0.1500 h.o Tukang batu Rp 138,000.00 Rp. 20,700.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp. 7,150.00
0.0100 h.o Mandor Rp 84,000.00 Rp. 840.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 40,490.00
2.5000 bh Kansteen Rp 24,200.00 Rp. 60,500.00
0.0500 m3 Pasir pasang Rp 176,000.00 Rp. 8,800.00
0.2510 zak Semen Rp 63,800.00 Rp. 16,013.80
Jumlah Biaya Bahan . . . . . . . . . . Rp. 85,313.80
Jumlah Total . . . . . . . . . . Rp. 125,803.80
C. PEKERJAAN KAYU

1. 1 m' Pengukuran dan pemasangan bouwplank


0.1000 h.o pekerja Rp 118,000.00 Rp. 11,800.00
0.1000 h.o tukang kayu Rp 138,000.00 Rp. 13,800.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp. 1,430.00
0.0050 h.o mandor Rp 163,000.00 Rp. 815.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 27,845.00

0.0120 m3 Kayu 5/7 Rp 2,085,000.00 Rp. 25,020.00


0.0200 kg Paku biasa 2"-5" Rp 20,000.00 Rp. 400.00
0.0070 m3 Kayu papan 3/20 Rp 2,182,000.00 Rp. 15,274.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 40,694.00

Jumlah Total . . . . . . . . . . Rp. 68,539.00

2. 1 m2 Pasang kaso + reng genteng biasa/kodok


0.1000 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.1000 h.o tukang kayu Rp 138,000.00 Rp 13,800.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.0050 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 27,845.00

0.0120 m3 Balok kayu kelas II Rp 3,250,000.00 Rp. 39,000.00


0.1500 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 3,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 42,000.00

Jumlah Total . . . . . . . . . . Rp. 69,845.00

3. 1 m2 Pasang kaso + reng genteng beton


0.1000 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.1000 h.o tukang kayu Rp 138,000.00 Rp 13,800.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.0050 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 27,845.00

0.0140 m3 Balok kayu kelas II Rp 3,250,000.00 Rp. 45,500.00


0.1500 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 3,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 48,500.00

Jumlah Total . . . . . . . . . . Rp. 76,345.00

4. 1 m2 Pasang kaso + reng atap sirap


0.1200 h.o pekerja Rp 118,000.00 Rp 14,160.00
0.1200 h.o tukang kayu Rp 138,000.00 Rp 16,560.00
0.0120 h.o kepala tukang Rp 143,000.00 Rp 1,716.00
0.0060 h.o mandor Rp 163,000.00 Rp 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 33,414.00

0.1650 m3 Balok kayu kelas II Rp 3,250,000.00 Rp. 536,250.00


0.2000 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 4,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 540,250.00

Jumlah Total . . . . . . . . . . Rp. 573,664.00

5. 1 m3 Pasang konstruksi kuda-kuda kayu, perancah, gelagar jembatan, balok pemikul, gording
4.0000 h.o pekerja Rp 118,000.00 Rp 472,000.00
12.0000 h.o tukang kayu Rp 138,000.00 Rp 1,656,000.00
1.2000 h.o kepala tukang Rp 143,000.00 Rp 171,600.00
0.2000 h.o mandor Rp 163,000.00 Rp 32,600.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 2,332,200.00

1.1000 m3 Balok kayu kelas II Rp 3,250,000.00 Rp 3,575,000.00


15.0000 kg Besi strip Rp 231,000.00 Rp 3,465,000.00
0.8000 kg Paku biasa 2" - 5" Rp 20,000.00 Rp 16,000.00
Jumlah Biaya Bahan . . . . . . . . . Rp. 7,056,000.00

Jumlah Total . . . . . . . . . Rp. 9,388,200.00

6. 1 m3 Pasang kusen pintu dan jendela kayu


6.0000 h.o pekerja Rp 118,000.00 Rp 708,000.00
18.0000 h.o tukang kayu Rp 138,000.00 Rp 2,484,000.00
2.0000 h.o kepala tukang Rp 143,000.00 Rp 286,000.00
0.3000 h.o mandor Rp 163,000.00 Rp 48,900.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 3,526,900.00
1.2000 m3 Kayu kelas I, balok Rp 9,000,000.00 Rp. 10,800,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 14,326,900.00

Jumlah Total . . . . . . . . . . Rp. 14,326,900.00

7. 1 m2 Pasang pintu klamp kayu


0.3500 h.o pekerja Rp 118,000.00 Rp. 41,300.00
1.0500 h.o tukang kayu Rp 138,000.00 Rp. 144,900.00
0.1050 h.o kepala tukang Rp 143,000.00 Rp. 15,015.00
0.0180 h.o mandor Rp 163,000.00 Rp. 2,934.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 204,149.00

0.0360 m3 Papan kayu kelas I Rp 15,000,000.00 Rp. 540,000.00


0.0500 kg Paku biasa 2"-5" Rp 20,000.00 Rp. 1,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 541,000.00
Jumlah Total . . . . . . . . . . Rp. 744,149.00

8. 1 m2 Pasang pintu panil kayu


1.0000 h.o pekerja Rp 118,000.00 Rp. 118,000.00
2.5000 h.o tukang kayu Rp 138,000.00 Rp. 345,000.00
0.2500 h.o kepala tukang Rp 143,000.00 Rp. 35,750.00
0.0500 h.o mandor Rp 163,000.00 Rp. 8,150.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 506,900.00

0.0400 m3 Papan kayu kelas I Rp 15,000,000.00 Rp. 600,000.00


Jumlah Biaya Bahan . . . . . . . . . . Rp. 600,000.00
Jumlah Total . . . . . . . . . . Rp. 1,106,900.00

9. 1 m2 Pasang pintu plywood/teakwood/triplek rangkap, rangka kayu


0.7000 h.o pekerja Rp 118,000.00 Rp. 82,600.00
2.1000 h.o tukang kayu Rp 138,000.00 Rp. 289,800.00
0.2100 h.o kepala tukang Rp 143,000.00 Rp. 30,030.00
0.0350 h.o mandor Rp 163,000.00 Rp. 5,705.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 408,135.00
0.0250 m 3
Papan kayu kelas I Rp 15,000,000.00 Rp. 375,000.00
0.0300 kg Paku biasa 1/2" - 1" Rp 20,000.00 Rp. 600.00
0.5000 ltr Lem kayu Rp 28,000.00 Rp. 14,000.00
1.0000 lbr Plywood/teakwood/triplek 4' x 3' x 4mm Rp 65,000.00 Rp. 65,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 454,600.00
Jumlah Total . . . . . . . . . . Rp. 862,735.00
Overhead + Profit (15%) Rp. 129,410.25
Jumlah Total Rp. 992,145.25

1 m2 Pasang HPL
0.1700 h.o Pekerja Rp 118,000.00 Rp. 20,060.00
0.1700 h.o Tukang Rp 138,000.00 Rp. 23,460.00
0.0170 h.o Kepala tukang Rp 143,000.00 Rp. 2,431.00
0.0085 h.o Mandor Rp 163,000.00 Rp. 1,385.50
Jumlah Upah Kerja . . . . . . . . . Rp. 47,336.50
1.0000 m2 HPL Rp 162,000.00 Rp. 162,000.00
0.3500 kg Lem vinyl Rp 28,000.00 Rp. 9,800.00
Jumlah Biaya Bahan . . . . . . . . . Rp. 171,800.00
. . . . . . . . . Rp. 219,136.50
Overhead + Profit (15%) Rp. 32,870.48
Jumlah Total Rp. 252,006.98

10. 1 m2 Pasang pintu dan jendela kaca


0.8000 h.o pekerja Rp 118,000.00 Rp 94,400.00
2.0000 h.o tukang kayu Rp 138,000.00 Rp 276,000.00
0.2000 h.o kepala tukang Rp 143,000.00 Rp 28,600.00
0.0400 h.o mandor Rp 163,000.00 Rp 6,520.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 405,520.00

0.0350 m3 Papan kayu kelas I Rp 15,000,000.00 Rp 525,000.00


Jumlah Biaya Bahan . . . . . . . . . . Rp 525,000.00
Jumlah Total . . . . . . . . . . Rp. 930,520.00

11. 1 m2 Pasang Jaluzi/ ventilasi mati kusen kayu


0.5000 h.o pekerja Rp 118,000.00 Rp. 59,000.00
2.0000 h.o tukang kayu Rp 138,000.00 Rp. 276,000.00
0.2000 h.o kepala tukang Rp 143,000.00 Rp. 28,600.00
0.0250 h.o mandor Rp 163,000.00 Rp. 4,075.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 367,675.00

0.0600 m3 Papan kayu kelas I Rp 15,000,000.00 Rp. 900,000.00


0.1500 kg Paku biasa 1/2" - 1" Rp 20,000.00 Rp. 3,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 903,000.00
Jumlah Total . . . . . . . . . . Rp. 1,270,675.00

12. 1 m2 Pasang pintu dan jendela Jaluzi kayu


1.0000 h.o pekerja Rp 118,000.00 Rp. 118,000.00
3.0000 h.o tukang kayu Rp 138,000.00 Rp. 414,000.00
0.3000 h.o kepala tukang Rp 143,000.00 Rp. 42,900.00
0.3000 h.o mandor Rp 163,000.00 Rp. 48,900.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 623,800.00

0.0640 m3 Papan kayu kelas I Rp 15,000,000.00 Rp. 960,000.00


Jumlah Biaya Bahan . . . . . . . . . . Rp 960,000.00

Jumlah Total . . . . . . . . . . Rp. 1,583,800.00


13. 1 m2 Pasang kayu rangka plafon (1 x 1) m
0.0120 m3 balok kayu kelas I Rp 9,000,000.00 Rp. 108,000.00
0.1000 kg paku 2" - 5" Rp 20,000.00 Rp. 2,000.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 110,000.00

0.1500 h.o pekerja Rp 118,000.00 Rp. 17,700.00


0.2500 h.o tukang kayu Rp 138,000.00 Rp. 34,500.00
0.0250 h.o kepala tukang Rp 143,000.00 Rp. 3,575.00
0.0750 h.o mandor Rp 163,000.00 Rp. 12,225.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 68,000.00

Jumlah Total . . . . . . . . . . Rp. 178,000.00

14. 1 m2 Pasang plafon kalsiboard


0.0300 h.o Pekerja Rp 118,000.00 Rp. 3,540.00
0.0700 h.o Tukang kayu Rp 138,000.00 Rp. 9,660.00
0.0070 h.o Kepala tukang Rp 143,000.00 Rp. 1,001.00
0.0015 h.o mandor Rp 163,000.00 Rp. 244.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 14,445.50

1.1000 lbr Pelat kalsiboard tebal 0,4 cm Rp 66,000.00 Rp. 72,600.00


0.0100 kg paku 1/2" - 1" Rp 45,000.00 Rp. 450.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 73,050.00

Jumlah Total . . . . . . . . . . Rp. 87,495.50

15. 1 m2 Pasang plafon tripleks tebal … mm


0.0700 h.o pekerja Rp 118,000.00 Rp 8,260.00
0.1000 h.o tukang kayu Rp 138,000.00 Rp 13,800.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.0035 h.o mandor Rp 163,000.00 Rp 570.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 24,060.50

0.3750 lbr Papan tripleks 4' x 8' x … mm Rp 65,000.00 Rp 24,375.00


0.0300 kg paku 1/2" - 1" Rp 45,000.00 Rp 1,350.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 25,725.00

Jumlah Total . . . . . . . . . . Rp. 49,785.50

16. 1 m2 Pasang plafon Gypsum


0.1000 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.0500 h.o tukang kayu Rp 138,000.00 Rp 6,900.00
0.0050 h.o kepala tukang Rp 143,000.00 Rp 715.00
0.0050 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 20,230.00
0.3640 lbr Papan gypsum (120x240x9) mm Rp 66,000.00 Rp 24,024.00
0.1100 kg paku sekrup Rp 45,000.00 Rp 4,950.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 28,974.00
Jumlah Total . . . . . . . . . . Rp. 49,204.00
Overhead + Profit (15%) Rp. 4,920.40
Jumlah Total Rp. 54,124.40

17. 1 m' Pasang list plafon kayu profil


0.0500 h.o pekerja Rp 118,000.00 Rp 5,900.00
0.0500 h.o tukang kayu Rp 138,000.00 Rp 6,900.00
0.0050 h.o kepala tukang Rp 143,000.00 Rp 715.00
0.0030 h.o mandor Rp 163,000.00 Rp 489.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 14,004.00

1.1000 m' Kayu profil Rp 9,000.00 Rp 9,900.00


0.0100 kg Paku Rp 45,000.00 Rp 450.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 10,350.00

Jumlah Total . . . . . . . . . . Rp. 24,354.00

18. 1 m' Pasang lisplang ukuran (3 x 20) cm


0.1000 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.2000 h.o tukang kayu Rp 138,000.00 Rp 27,600.00
0.0200 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.0050 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 43,075.00

0.0072 m3 Papan kayu 3x20 kelas I Rp 15,000,000.00 Rp 108,000.00


0.0500 kg Paku biasa 2" - 5" Rp 45,000.00 Rp 2,250.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 110,250.00

Jumlah Total . . . . . . . . . . Rp. 153,325.00


19. 1 m' Pasang lisplang ukuran (3 x 30) cm
0.1100 h.o pekerja Rp 118,000.00 Rp 12,980.00
0.2200 h.o tukang kayu Rp 138,000.00 Rp 30,360.00
0.0220 h.o kepala tukang Rp 143,000.00 Rp 3,146.00
0.0050 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 47,301.00

0.0110 m3 Papan kayu 3x30 kelas I Rp 15,000,000.00 Rp 165,000.00


0.0500 kg Paku biasa 2" - 5" Rp 45,000.00 Rp 2,250.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 167,250.00

Jumlah Total . . . . . . . . . . Rp. 214,551.00


20. 1 m2 Pasang rangka dinding sekat kayu
0.1500 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.4500 h.o tukang kayu Rp 138,000.00 Rp 62,100.00
0.0450 h.o kepala tukang Rp 143,000.00 Rp 6,435.00
0.0750 h.o mandor Rp 163,000.00 Rp 12,225.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 98,460.00

0.0070 m3 Papan kayu kelas I Rp 15,000,000.00 Rp 105,000.00


0.0195 m3 Balok kayu kelas I Rp 9,000,000.00 Rp 175,500.00
0.1000 kg Paku biasa 2" - 5" Rp 45,000.00 Rp 4,500.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 285,000.00

Jumlah Total . . . . . . . . . . Rp. 383,460.00

21. 1 m2 Pasang dinding sekat plywood/teakwood/triplek rangkap, rangka kayu


0.2000 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.6000 h.o tukang kayu Rp 138,000.00 Rp 82,800.00
0.0600 h.o kepala tukang Rp 143,000.00 Rp 8,580.00
0.0100 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 116,610.00

0.0070 m3 Papan kayu kelas I Rp 15,000,000.00 Rp 105,000.00


0.0195 m3 Balok kayu kelas I Rp 9,000,000.00 Rp 175,500.00
0.5600 ltr Lem kayu Rp 11,000.00 Rp 6,160.00
1.0000 lbr Plywood/teakwood/triplek 4' x 8' x … mm Rp 54,000.00 Rp 54,000.00
0.1000 kg Paku biasa 2" - 5" Rp 45,000.00 Rp 4,500.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 345,160.00

Jumlah Total . . . . . . . . . . Rp. 461,770.00

22. 1 m2 Pasang plywood/triplek tebal 4 mm untuk dinding


0.0250 h.o pekerja Rp 118,000.00 Rp 2,950.00
0.0750 h.o tukang kayu Rp 138,000.00 Rp 10,350.00
0.0075 h.o kepala tukang Rp 143,000.00 Rp 1,072.50
0.0013 h.o mandor Rp 163,000.00 Rp 211.90
Jumlah Upah Kerja . . . . . . . . . . Rp. 14,584.40

0.4000 lbr Plywood/triplek 4' x 8' x 4mm Rp 54,000.00 Rp 21,600.00


0.0500 kg Paku biasa 2" - 5" Rp 45,000.00 Rp 2,250.00
Jumlah Biaya Bahan . . . . . . . . . . Rp. 23,850.00
Jumlah Total . . . . . . . . . . Rp. 38,434.40

1 m2 Pasang dinding partisi gypsum 9 mm


0.5500 h.o Pekerja Rp 118,000.00 Rp 64,900.00
0.2750 h.o Tukang kayu Rp 138,000.00 Rp 37,950.00
0.0400 h.o Kepala tukang Rp 143,000.00 Rp 5,720.00
0.0250 h.o Mandor Rp 163,000.00 Rp 4,075.00
Jumlah Upah Kerja ..... . . . . . . . . . Rp. 112,645.00
0.4500 lbr Gypsum 9mm Rp 66,000.00 Rp 29,700.00
0.2200 kg Paku Sekrup Rp 45,000.00 Rp 9,900.00
0.0320 roll Plester sambungan gypsum Rp 74,415.00 Rp 2,381.28
0.6000 kg Compound gypsum Rp 5,021.00 Rp 3,012.60
1.0000 lbr Kertas gosok Rp - Rp -
3.5200 m' Baja Ringan 36x75 mm Rp 16,226.50 Rp 57,117.28
6.0000 bh Ramsel Nails Rp 14,570.00 Rp 87,420.00
Jumlah Biaya Bahan ..... . . . . . . . . . Rp. 189,531.16
. . . . . . . . . Rp. 192,543.76
Overhead + Profit (15%) Rp. 28,881.56
Jumlah Total Rp. 221,425.32

23. 1 m2 Pasang Begisting untuk pondasi


0.5200 h.o pekerja Rp 118,000.00 Rp. 61,360.00
0.2600 h.o tukang kayu Rp 138,000.00 Rp. 35,880.00
0.0260 h.o kepala tukang Rp 143,000.00 Rp. 3,718.00
0.0260 h.o mandor Rp 163,000.00 Rp. 4,238.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 105,196.00
0.0200 m3 Papan kayu Rp 2,182,000.00 Rp. 43,640.00
0.3000 kg Paku biasa 2" - 5" Rp 45,000.00 Rp. 13,500.00
0.1000 ltr Minyak bekisting Rp 50,000.00 Rp. 5,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 62,140.00
Jumlah Total . . . . . . . . . . Rp. 167,336.00
Overhead + Profit (15%) Rp. 16,733.60
Jumlah Total Rp. 184,069.60

24. 1 m2 Pasang Begisting untuk sloof


0.3000 h.o pekerja Rp 118,000.00 Rp. 35,400.00
0.2600 h.o tukang kayu Rp 138,000.00 Rp. 35,880.00
0.0260 h.o kepala tukang Rp 143,000.00 Rp. 3,718.00
0.0050 h.o mandor Rp 163,000.00 Rp. 815.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 75,813.00
0.0225 m3 Papan kayu Rp 2,182,000.00 Rp. 49,095.00
0.3000 kg Paku biasa 2" - 5" Rp 45,000.00 Rp. 13,500.00
0.1000 ltr Minyak bekisting Rp 50,000.00 Rp. 5,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 67,595.00
Jumlah Total . . . . . . . . . . Rp. 143,408.00
Overhead + Profit (15%) Rp. 14,340.80
Jumlah Total Rp. 157,748.80

25. 1 m2 Pasang Begisting untuk kolom


0.6600 h.o pekerja Rp 118,000.00 Rp. 77,880.00
0.3300 h.o tukang kayu Rp 138,000.00 Rp. 45,540.00
0.0330 h.o kepala tukang Rp 143,000.00 Rp. 4,719.00
0.0330 h.o mandor Rp 163,000.00 Rp. 5,379.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 133,518.00
0.0200 m3 Papan kayu Rp 2,182,000.00 Rp. 43,640.00
0.4000 kg Paku biasa 2" - 5" Rp 45,000.00 Rp. 18,000.00
0.0075 m3 Balok kayu Kls II Rp 3,250,000.00 Rp. 24,375.00
0.1750 lbr Plywood tebal 9 mm Rp 90,000.00 Rp. 15,750.00
1.0000 btg Dolken kayu galam f 8 - 10/4 m Rp 60,000.00 Rp. 60,000.00
0.2000 ltr Minyak bekisting Rp 50,000.00 Rp. 10,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 171,765.00
Jumlah Total . . . . . . . . . . Rp. 305,283.00
Overhead + Profit (15%) Rp. 30,528.30
Jumlah Total Rp. 335,811.30

26. 1 m2 Pasang Begisting untuk balok


0.3200 h.o pekerja Rp 118,000.00 Rp. 37,760.00
0.3300 h.o tukang kayu Rp 138,000.00 Rp. 45,540.00
0.0330 h.o kepala tukang Rp 143,000.00 Rp. 4,719.00
0.0060 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 88,997.00

0.0200 m3 Papan kayu Rp 2,182,000.00 Rp. 43,640.00


0.4000 kg Paku biasa 2" - 5" Rp 45,000.00 Rp. 18,000.00
0.0090 m3 Balok kayu Rp 3,250,000.00 Rp. 29,250.00
0.1750 lbr Plywood tebal 9 mm Rp 90,000.00 Rp. 15,750.00
1.0000 btg Dolken kayu galam f 8 - 10/4 m Rp 60,000.00 Rp. 60,000.00
0.2000 ltr Minyak bekisting Rp 50,000.00 Rp. 10,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 176,640.00

Jumlah Total . . . . . . . . . . Rp. 265,637.00

27. 1 m2 Pasang Begisting untuk lantai/pelat


0.3200 h.o pekerja Rp 118,000.00 Rp. 37,760.00
0.3300 h.o tukang kayu Rp 138,000.00 Rp. 45,540.00
0.0330 h.o kepala tukang Rp 143,000.00 Rp. 4,719.00
0.0060 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 88,997.00

0.0200 m3 Papan kayu Rp 2,182,000.00 Rp. 43,640.00


0.4000 kg Paku biasa 2" - 5" Rp 45,000.00 Rp. 18,000.00
0.0075 m3 Balok kayu Rp 3,250,000.00 Rp. 24,375.00
0.1750 lbr Plywood tebal 9 mm Rp 90,000.00 Rp. 15,750.00
4.0000 btg Dolken kayu galam f 8 - 10/4 m Rp 60,000.00 Rp. 240,000.00
0.2000 ltr Minyak bekisting Rp 50,000.00 Rp. 10,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 351,765.00

Jumlah Total . . . . . . . . . . Rp. 440,762.00

28. 1 m2 Pasang Begisting untuk dinding


0.3200 h.o pekerja Rp 118,000.00 Rp. 37,760.00
0.3300 h.o tukang kayu Rp 138,000.00 Rp. 45,540.00
0.0330 h.o kepala tukang Rp 143,000.00 Rp. 4,719.00
0.0060 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 88,997.00
0.0300 m3 Papan kayu Rp 2,182,000.00 Rp. 65,460.00
0.4000 kg Paku biasa 2" - 5" Rp 45,000.00 Rp. 18,000.00
0.0200 m3 Balok kayu Rp 3,250,000.00 Rp. 65,000.00
0.3500 lbr Plywood tebal 9 mm Rp 90,000.00 Rp. 31,500.00
3.0000 btg Dolken kayu galam f 8 - 10/4 m Rp 60,000.00 Rp. 180,000.00
4.0000 bh Formtie/penjaga jarak begisting Rp 15,000.00 Rp. 60,000.00
0.2000 ltr Minyak bekisting Rp 50,000.00 Rp. 10,000.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 429,960.00

Jumlah Total . . . . . . . . . . Rp. 518,957.00


29. 1 m2 Pasang Begisting untuk tangga
0.3200 h.o pekerja Rp 118,000.00 Rp. 37,760.00
0.3300 h.o tukang kayu Rp 138,000.00 Rp. 45,540.00
0.0330 h.o kepala tukang Rp 143,000.00 Rp. 4,719.00
0.0060 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 88,997.00

0.0300 m3 Papan kayu Rp 2,182,000.00 Rp. 65,460.00


0.4000 kg Paku biasa 2" - 5" Rp 45,000.00 Rp. 18,000.00
0.0150 m3 Balok kayu Rp 3,250,000.00 Rp. 48,750.00
0.3500 lbr Plywood tebal 9 mm Rp 90,000.00 Rp. 31,500.00
2.0000 btg Dolken kayu galam f 8 - 10/4 m Rp 60,000.00 Rp. 120,000.00
0.1500 ltr Minyak bekisting Rp 50,000.00 Rp. 7,500.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 291,210.00
Jumlah Total . . . . . . . . . . Rp. 380,207.00

1 m2 Pasang begisting batako 6x12x24 untuk pondasi


0.3200 h.o Pekerja Rp 118,000.00 Rp. 37,760.00
0.1000 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.0100 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.0150 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 55,435.00
23.8095 bh Batako Rp 2,511.36 59,794.37
0.1500 zak Semen portland 50 kg Rp 58,000.00 8,700.00
0.0270 m3 Pasir pasang Rp 165,000.00 4,455.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 72,949.37
Jumlah Total . . . . . . . . . . Rp. 128,384.37
D. PEKERJAAN BETON, PASANGAN, DAN PLESTERAN
1 m3 Beton dengan mutu K-100 (manual)
1.2000 h.o Pekerja Rp 118,000.00 Rp 141,600.00
0.2000 h.o Tukang batu Rp 138,000.00 Rp 27,600.00
0.0200 h.o Kepala tukang Rp 143,000.00 Rp 2,860.00
0.0600 h.o Mandor Rp 163,000.00 Rp 9,780.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 181,840.00
0.7083 m3 Batu pecah Rp 450,000.00 Rp 318,724.14
0.4961 m3 Pasir beton Rp 165,000.00 Rp 81,858.33
4.6000 zak Semen portland 50 kg Rp 58,000.00 Rp 266,800.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 667,382.47
. . . . . . . . . . Rp. 849,222.47
Overhead + Profit (15%) Rp. 127,383.37
Jumlah Total Rp. 976,605.84

1 m3 Beton dengan mutu K-175 (Ready Mix)


1.0000 h.o Pekerja Rp 118,000.00 Rp 118,000.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.1000 h.o Mandor Rp 163,000.00 Rp 16,300.00
. . . . . . . . . Rp 172,375.00
1.0500 m3 Beton Ready Mix K-175 Rp 815,000.00 Rp 855,750.00
. . . . . . . . . Rp 855,750.00
. . . . . . . . . Rp 1,028,125.00
Overhead + Profit (15%) Rp. 154,218.75
Jumlah Total Rp. 1,182,343.75

1 m3 Beton dengan mutu K-250 (Ready Mix)


1.0000 h.o Pekerja Rp 118,000.00 Rp 118,000.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.1000 h.o Mandor Rp 163,000.00 Rp 16,300.00
. . . . . . . . . Rp 172,375.00
1.0500 m3 Beton Ready Mix K-250 Rp 964,000.00 Rp 1,012,200.00
. . . . . . . . . Rp 1,012,200.00
. . . . . . . . . Rp 1,184,575.00
Overhead + Profit (15%) Rp. 177,686.25
Jumlah Total Rp. 1,362,261.25

1 m3 Beton dengan mutu K-300 (Ready Mix)


1.0000 h.o Pekerja Rp 118,000.00 Rp 118,000.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.1000 h.o Mandor Rp 163,000.00 Rp 16,300.00
. . . . . . . . . Rp 172,375.00
1.0500 m3 Beton Ready Mix K-300 Rp 1,000,000.00 Rp 1,050,000.00
. . . . . . . . . Rp 1,050,000.00
. . . . . . . . . Rp 1,222,375.00
Overhead + Profit (15%) Rp. 183,356.25
Jumlah Total Rp. 1,405,731.25

1 m3 Beton dengan mutu K-350 (Ready Mix)


1.0000 h.o Pekerja Rp 118,000.00 Rp 118,000.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.1000 h.o Mandor Rp 163,000.00 Rp 16,300.00
. . . . . . . . . Rp 172,375.00
1.0500 m3 Beton Ready Mix K-350 Rp 1,070,000.00 Rp 1,123,500.00
. . . . . . . . . Rp 1,123,500.00
. . . . . . . . . Rp 1,295,875.00
Overhead + Profit (15%) Rp. 194,381.25
Jumlah Total Rp. 1,490,256.25

1. 1 m3 Beton dengan mutu K-275 (manual)


Asumsi : a) Volume pekerjaan relatif kecil
b) Digunakan untuk pekerjaan beton non struktural
c) Tidak terdapat alat (molen) di daerah setempat.

6.0000 h.o Pekerja Rp 118,000.00 Rp 708,000.00


1.0000 h.o Tukang batu Rp 138,000.00 Rp 138,000.00
0.1000 h.o Kepala tukang Rp 143,000.00 Rp 14,300.00
0.3000 h.o Mandor Rp 163,000.00 Rp 48,900.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 909,200.00

0.8200 m3 Batu pecah Rp 450,000.00 Rp 369,000.00


0.4000 m3 pasir beton Rp 165,000.00 Rp 66,000.00
8.0000 sak Semen Portland 50kg Rp 58,000.00 Rp 464,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 899,000.00
Jumlah Total . . . . . . . . . . Rp. 1,808,200.00

2. 1 m3 Beton dengan mutu K-225 (manual)


Asumsi : a) Volume pekerjaan relatif kecil
b) Digunakan untuk pekerjaan beton non struktural
c) Tidak terdapat alat (molen) di daerah setempat.
6.0000 h.o Pekerja Rp 118,000.00 Rp 708,000.00
1.0000 h.o Tukang batu Rp 138,000.00 Rp 138,000.00
0.1000 h.o Kepala tukang Rp 143,000.00 Rp 14,300.00
0.3000 h.o Mandor Rp 163,000.00 Rp 48,900.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 909,200.00

0.6500 m3 Batu pecah Rp 450,000.00 Rp 292,500.00


0.6500 m3 pasir beton Rp 165,000.00 Rp 107,250.00
7.7600 sak Semen Portland 50kg Rp 58,000.00 Rp 450,080.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 849,830.00

Jumlah Total . . . . . . . . . . Rp. 1,759,030.00

3. 1 m3 Beton K-125 menggunakan Molen 125 ltr


2.4348 h.o Pekerja Rp 118,000.00 Rp 287,304.35
0.4000 h.o Tukang batu Rp 138,000.00 Rp 55,200.00
0.0400 h.o Kep. Tukang Rp 143,000.00 Rp 5,720.00
0.0400 h.o Operator Rp 163,000.00 Rp 6,520.00
0.1739 h.o Mandor Rp 163,000.00 Rp 28,347.83
Jumlah Upah Kerja . . . . . . . . . . Rp. 383,092.17

0.6957 m3 Batu pecah Rp 450,000.00 Rp 313,043.48


0.5217 m3 pasir beton Rp 165,000.00 Rp 86,086.96
5.0087 sak Semen Portland 50kg Rp 58,000.00 Rp 290,504.35
Jumlah Biaya bahan . . . . . . . . . . Rp. 689,634.78

0.1739 h.a Vibrator beton 4HP Rp - Rp -


0.1739 h.a Molen beton 125 ltr/6HP Rp 1,000,000.00 Rp 173,913.04
0.1739 h.a Pompa air (f 50mm) 30m3/jam Rp - Rp -
0.0835 set Alat bantu (set @ 3 alat) Rp - Rp -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. 173,913.04

Jumlah Total . . . . . . . . . . Rp. 1,246,640.00

4. 1 m3 Beton K-175 menggunakan Molen 125 ltr


2.3333 h.o Pekerja Rp 118,000.00 Rp 275,333.33
0.4000 h.o Tukang batu Rp 138,000.00 Rp 55,200.00
0.0400 h.o Kep. Tukang Rp 143,000.00 Rp 5,720.00
0.0400 h.o Operator Rp 163,000.00 Rp 6,520.00
0.1667 h.o Mandor Rp 163,000.00 Rp 27,166.67
Jumlah Upah Kerja . . . . . . . . . . Rp. 369,940.00

0.7292 m3 Batu pecah Rp 450,000.00 Rp 328,125.00


0.5208 m3 pasir beton Rp 165,000.00 Rp 85,937.50
6.0000 sak Semen Portland 50kg Rp 58,000.00 Rp 348,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 762,062.50
0.1667 h.a Vibrator beton 4HP Rp - Rp -
0.1667 h.a Molen beton 125 ltr/6HP Rp 1,000,000.00 Rp 166,666.67
0.1667 h.a Pompa air (f 50mm) 30m3/jam Rp - Rp -
0.0800 set Alat bantu (set @ 3 alat) Rp - Rp -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. 166,666.67

Jumlah Total . . . . . . . . . . Rp. 1,298,669.17

5. 1 m3 Beton K-225 menggunakan Molen 125 ltr


2.2703 h.o Pekerja Rp 118,000.00 Rp 267,891.89
0.4000 h.o Tukang batu Rp 138,000.00 Rp 55,200.00
0.0400 h.o Kep. Tukang Rp 143,000.00 Rp 5,720.00
0.0400 h.o Operator Rp 163,000.00 Rp 6,520.00
0.1622 h.o Mandor Rp 163,000.00 Rp 26,432.43
Jumlah Upah Kerja . . . . . . . . . . Rp. 361,764.32

0.7297 m3 Batu pecah Rp 450,000.00 Rp 328,378.38


0.4865 m3 pasir beton Rp 165,000.00 Rp 80,270.27
7.0054 sak Semen Portland 50kg Rp 58,000.00 Rp 406,313.51
Jumlah Biaya bahan . . . . . . . . . . Rp. 814,962.16

0.1622 h.a Vibrator beton 4HP Rp - Rp -


0.1622 h.a Molen beton 125 ltr/6HP Rp 1,000,000.00 Rp 162,162.16
0.1622 h.a Pompa air (f 50mm) 30m3/jam Rp - Rp -
0.0778 set Alat bantu (set @ 3 alat) Rp - Rp -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. 162,162.16
Jumlah Total . . . . . . . . . . Rp. 1,338,888.65

6. 1 m3 Beton K-125 menggunakan Molen 250 ltr


2.4348 h.o Pekerja Rp 118,000.00 Rp 287,304.35
0.4000 h.o Tukang batu Rp 138,000.00 Rp 55,200.00
0.0400 h.o Kep. Tukang Rp 143,000.00 Rp 5,720.00
0.0400 h.o Operator Rp 163,000.00 Rp 6,520.00
0.0870 h.o Mandor Rp 163,000.00 Rp 14,173.91
Jumlah Upah Kerja . . . . . . . . . . Rp. 368,918.26

0.6957 m3 Batu pecah Rp 450,000.00 Rp 313,043.48


0.5217 m3 pasir beton Rp 165,000.00 Rp 86,086.96
5.0087 sak Semen Portland 50kg Rp 58,000.00 Rp 290,504.35
Jumlah Biaya bahan . . . . . . . . . . Rp. 689,634.78

0.1739 h.a Vibrator beton 4HP Rp - Rp -


0.0870 h.a Molen beton 250 ltr/10HP Rp 1,000,000.00 Rp 86,956.52
0.0870 h.a Pompa air (f 50mm) 30m3/jam Rp - Rp -
0.0870 set Alat bantu (set @ 3 alat) Rp - Rp -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. 86,956.52

Jumlah Total . . . . . . . . . . Rp. 1,145,509.57

7. 1 m3 Beton K-175 menggunakan Molen 250 ltr


2.9167 h.o Pekerja Rp 118,000.00 Rp 344,166.67
0.4000 h.o Tukang batu Rp 138,000.00 Rp 55,200.00
0.0400 h.o Kep. Tukang Rp 143,000.00 Rp 5,720.00
0.0400 h.o Operator Rp 163,000.00 Rp 6,520.00
0.1042 h.o Mandor Rp 163,000.00 Rp 16,979.17
Jumlah Upah Kerja . . . . . . . . . . Rp. 428,585.83

0.7292 m3 Batu pecah Rp 450,000.00 Rp 328,125.00


0.5208 m3 pasir beton Rp 165,000.00 Rp 85,937.50
6.0000 sak Semen Portland 50kg Rp 58,000.00 Rp 348,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 762,062.50

0.2083 h.a Vibrator beton 4HP Rp - Rp -


0.1042 h.a Molen beton 250 ltr/10HP Rp 1,000,000.00 Rp 104,166.67
0.1042 h.a Pompa air (f 50mm) 30m3/jam Rp - Rp -
0.1042 set Alat bantu (set @ 3 alat) Rp - Rp -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. 104,166.67

Jumlah Total . . . . . . . . . . Rp. 1,294,815.00


8. 1 m3 Beton K-225 menggunakan Molen 250 ltr
2.5455 h.o Pekerja Rp 118,000.00 Rp 300,363.64
0.4000 h.o Tukang batu Rp 138,000.00 Rp 55,200.00
0.0400 h.o Kep. Tukang Rp 143,000.00 Rp 5,720.00
0.0400 h.o Operator Rp 163,000.00 Rp 6,520.00
0.0909 h.o Mandor Rp 163,000.00 Rp 14,818.18
Jumlah Upah Kerja . . . . . . . . . . Rp. 382,621.82

0.7273 m3 Batu pecah Rp 450,000.00 Rp 327,272.73


0.4848 m3 pasir beton Rp 165,000.00 Rp 80,000.00
6.9818 sak Semen Portland 50kg Rp 58,000.00 Rp 404,945.45
Jumlah Biaya bahan . . . . . . . . . . Rp. 812,218.18
0.1818 h.a Vibrator beton 4HP Rp - Rp -
0.0909 h.a Molen beton 250 ltr/10HP Rp 1,000,000.00 Rp 90,909.09
0.0909 h.a Pompa air (f 50mm) 30m3/jam Rp - Rp -
0.0909 set Alat bantu (set @ 3 alat) Rp - Rp -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. 90,909.09

Jumlah Total . . . . . . . . . . Rp. 1,285,749.09

9. 1 m3 Beton K-175 menggunakan Molen 500 ltr


2.8646 h.o Pekerja Rp 118,000.00 Rp 338,020.83
0.4000 h.o Tukang batu Rp 138,000.00 Rp 55,200.00
0.0400 h.o Kep. Tukang Rp 143,000.00 Rp 5,720.00
0.0400 h.o Operator Rp 163,000.00 Rp 6,520.00
0.0521 h.o Mandor Rp 163,000.00 Rp 8,489.58
Jumlah Upah Kerja . . . . . . . . . . Rp. 413,950.42

0.7292 m 3
Batu pecah Rp 450,000.00 Rp 328,125.00
0.5208 m3 pasir beton Rp 165,000.00 Rp 85,937.50
6.0000 sak Semen Portland 50kg Rp 58,000.00 Rp 348,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 762,062.50

0.2083 h.a Vibrator beton 4HP Rp - Rp -


0.0521 h.a Molen beton 500 ltr/20HP Rp 1,000,000.00 Rp 52,083.33
0.0521 h.a Pompa air (f 50mm) 30m3/jam Rp - Rp -
0.1042 set Alat bantu (set @ 3 alat) Rp - Rp -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. 52,083.33

Jumlah Total . . . . . . . . . . Rp. 1,228,096.25

10. 1 m3 Beton K-225 menggunakan Molen 500 ltr


2.5000 h.o Pekerja Rp 118,000.00 Rp 295,000.00
0.4000 h.o Tukang batu Rp 138,000.00 Rp 55,200.00
0.0400 h.o Kep. Tukang Rp 143,000.00 Rp 5,720.00
0.0400 h.o Operator Rp 163,000.00 Rp 6,520.00
0.0909 h.o Mandor Rp 163,000.00 Rp 14,818.18
Jumlah Upah Kerja . . . . . . . . . . Rp. 377,258.18

0.7273 m3 Batu pecah Rp 450,000.00 Rp 327,272.73


0.4848 m3 pasir beton Rp 165,000.00 Rp 80,000.00
6.9818 sak Semen Portland 50kg Rp 58,000.00 Rp 404,945.45
Jumlah Biaya bahan . . . . . . . . . . Rp. 812,218.18

0.1818 h.a Vibrator beton 4HP Rp - Rp -


0.0455 h.a Molen beton 500 ltr/20HP Rp 1,000,000.00 Rp 45,454.55
0.0455 h.a Pompa air (f 50mm) 30m3/jam Rp - Rp -
0.0909 set Alat bantu (set @ 3 alat) Rp - Rp -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. 45,454.55

Jumlah Total . . . . . . . . . . Rp. 1,234,930.91

11. 1 m3 Beton K-275 menggunakan Molen 500 ltr


2.2917 h.o Pekerja Rp 118,000.00 Rp 270,416.67
0.4000 h.o Tukang batu Rp 138,000.00 Rp 55,200.00
0.0400 h.o Kep. Tukang Rp 143,000.00 Rp 5,720.00
0.0400 h.o Operator Rp 163,000.00 Rp 6,520.00
0.0833 h.o Mandor Rp 163,000.00 Rp 13,583.33
Jumlah Upah Kerja . . . . . . . . . . Rp. 351,440.00

0.8333 m3 Batu pecah Rp 450,000.00 Rp 375,000.00


0.4167 m3 pasir beton Rp 165,000.00 Rp 68,750.00
8.0000 sak Semen Portland 50kg Rp 58,000.00 Rp 464,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 907,750.00
0.1667 h.a Vibrator beton 4HP Rp - Rp -
0.0417 h.a Molen beton 500 ltr/20HP Rp 1,000,000.00 Rp 41,666.67
0.0417 h.a Pompa air (f 50mm) 30m3/jam Rp - Rp -
0.0833 set Alat bantu (set @ 3 alat) Rp - Rp -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. 41,666.67

Jumlah Total . . . . . . . . . . Rp. 1,300,856.67

12. 1 m3 Beton K-350 menggunakan Molen 500 ltr


2.4444 h.o Pekerja Rp 118,000.00 Rp 288,444.44
0.4000 h.o Tukang batu Rp 138,000.00 Rp 55,200.00
0.0400 h.o Kep. Tukang Rp 143,000.00 Rp 5,720.00
0.0400 h.o Operator Rp 163,000.00 Rp 6,520.00
0.0889 h.o Mandor Rp 163,000.00 Rp 14,488.89
Jumlah Upah Kerja . . . . . . . . . . Rp. 370,373.33

0.8148 m3 Batu pecah Rp 450,000.00 Rp 366,666.67


0.4444 m3 pasir beton Rp 165,000.00 Rp 73,333.33
8.5333 sak Semen Portland 50kg Rp 58,000.00 Rp 494,933.33
Jumlah Biaya bahan . . . . . . . . . . Rp. 934,933.33

0.1778 h.a Vibrator beton 4HP Rp - Rp -


0.0444 h.a Molen beton 500 ltr/20HP Rp 1,000,000.00 Rp 44,444.44
0.0444 h.a Pompa air (f 50mm) 30m3/jam Rp - Rp -
0.0889 set Alat bantu (set @ 3 alat) Rp - Rp -
Jumlah Biaya Peralatan . . . . . . . . . . Rp. 44,444.44
Jumlah Total . . . . . . . . . . Rp. 1,349,751.11

1 m' Kolom praktis 15x15 cm, K-175


0.180 h.o Pekerja Rp 118,000.00 Rp 21,240.00
0.020 h.o Tukang batu Rp 138,000.00 Rp 2,760.00
0.020 h.o Tukang kayu Rp 138,000.00 Rp 2,760.00
0.020 h.o Tukang besi Rp 138,000.00 Rp 2,760.00
0.006 h.o Kepala tukang Rp 143,000.00 Rp 858.00
0.009 h.o Mandor Rp 163,000.00 Rp 1,467.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 31,845.00
0.002 m3 Kayu sembarang Rp 2,182,000.00 Rp 4,364.00
0.010 kg Paku biasa 2" - 5 " Rp 20,000.00 Rp 200.00
3.000 kg Besi beton polos Rp 12,000.00 Rp 36,000.00
0.450 kg Kawat beton Rp 25,000.00 Rp 11,250.00
6.000 kg Semen portland Rp 1,160.00 Rp 6,960.00
0.006 m3 Pasir beton Rp 165,000.00 Rp 990.00
0.009 m3 Koral beton Rp 294,000.00 Rp 2,646.00
Jumlah Biaya Peralatan . . . . . . . . . . Rp. 62,410.00
. . . . . . . . . . Rp. 94,255.00
Overhead + Profit (15%) Rp. 14,138.25
Jumlah Total Rp. 108,393.25

13. 1 kg Pembesian dengan besi polos atau besi ulir


0.0070 h.o Pekerja Rp 118,000.00 Rp 826.00
0.0070 h.o Tukang batu Rp 138,000.00 Rp 966.00
0.0007 h.o Kepala tukang Rp 143,000.00 Rp 100.10
0.0003 h.o Mandor Rp 163,000.00 Rp 48.90
Jumlah Upah Kerja . . . . . . . . . . Rp. 1,941.00
1.0500 kg Besi beton (polos/ulir) Rp 12,000.00 Rp 12,600.00
0.0150 kg Kawat beton/bendrat Rp 22,000.00 Rp 330.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 12,930.00
Jumlah Total . . . . . . . . . . Rp. 14,871.00
Overhead + Profit (15%) Rp. 1,487.10
Jumlah Total Rp. 16,358.10

14. 1 m3 beton bertulang 1 PC : 2 Pasir : 3 Batu Pecah


1.6500 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.0800 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 245,815.00

0.7800 m3 Batu pecah Rp 450,000.00 Rp 351,000.00


0.5200 m3 pasir beton Rp 165,000.00 Rp 85,800.00
4.6400 sak Semen Portland 50kg Rp 58,000.00 Rp 269,120.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 705,920.00

Jumlah Total . . . . . . . . . . Rp. 951,735.00

15. 1 m3 beton bertulang 1 PC : 2 Pasir : 4 Batu Pecah


1.6500 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.0800 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 245,815.00

0.9000 m3 Batu pecah Rp 450,000.00 Rp 405,000.00


0.4500 m3 pasir beton Rp 165,000.00 Rp 74,250.00
5.6000 sak Semen Portland 50kg Rp 58,000.00 Rp 324,800.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 804,050.00
Jumlah Total . . . . . . . . . . Rp. 1,049,865.00
16. 1 m3 beton bertulang 1 PC : 2 Pasir : 2,5 Batu Pecah
1.6500 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.0800 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 245,815.00

0.7000 m3 Batu pecah Rp 450,000.00 Rp 315,000.00


0.5600 m3 pasir beton Rp 165,000.00 Rp 92,400.00
7.0400 sak Semen Portland 50kg Rp 58,000.00 Rp 408,320.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 815,720.00
Jumlah Total . . . . . . . . . . Rp. 1,061,535.00

17. 1 m3 beton bertulang 1 PC : 1,5 Pasir : 3 Batu Pecah


1.6500 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.0800 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 245,815.00

0.5400 m3 Batu pecah Rp 450,000.00 Rp 243,000.00


0.4200 m3 pasir beton Rp 165,000.00 Rp 69,300.00
7.1400 sak Semen Portland 50kg Rp 58,000.00 Rp 414,120.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 726,420.00
Jumlah Total . . . . . . . . . . Rp. 972,235.00

18. 1 m3 beton bertulang 1 PC : 1 Pasir : 2 Batu Pecah


1.6500 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.0800 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 245,815.00

0.7400 m3 Batu pecah Rp 450,000.00 Rp 333,000.00


0.3700 m3 pasir beton Rp 165,000.00 Rp 61,050.00
9.5800 sak Semen Portland 50kg Rp 58,000.00 Rp 555,640.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 949,690.00
Jumlah Total . . . . . . . . . . Rp. 1,195,505.00

19. 1 m3 beton tumbuk 1 PC : 3 Pasir : 5 Batu Pecah


1.6500 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.0800 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 245,815.00
0.8700 m3 Batu pecah Rp 450,000.00 Rp 391,500.00
0.5200 m3 pasir beton Rp 165,000.00 Rp 85,800.00
4.3600 sak Semen Portland 50kg Rp 58,000.00 Rp 252,880.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 730,180.00
Jumlah Total . . . . . . . . . . Rp. 975,995.00

20. 1 m3 beton tumbuk 1 PC : 3 Pasir : 6 Batu Pecah


1.6500 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.0800 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 245,815.00

0.9400 m3 Batu pecah Rp 450,000.00 Rp 423,000.00


0.4700 m3 pasir beton Rp 165,000.00 Rp 77,550.00
3.9400 sak Semen Portland 50kg Rp 58,000.00 Rp 228,520.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 729,070.00
Jumlah Total . . . . . . . . . . Rp. 974,885.00

21. 1 m3 beton tumbuk 1 PC : 4 Pasir : 6 Batu Pecah


1.6500 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.2500 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.0800 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 245,815.00

0.8700 m3 Batu pecah Rp 450,000.00 Rp 391,500.00


0.5700 m3 pasir beton Rp 165,000.00 Rp 94,050.00
3.4600 sak Semen Portland 50kg Rp 58,000.00 Rp 200,680.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 686,230.00

Jumlah Total . . . . . . . . . . Rp. 932,045.00


22. 1 m3 Pasang pondasi batu kosong
0.7800 h.o pekerja Rp 118,000.00 Rp. 92,040.00
0.3900 h.o tukang batu Rp 138,000.00 Rp. 53,820.00
0.0390 h.o kepala tukang Rp 143,000.00 Rp. 5,577.00
0.0390 h.o mandor Rp 163,000.00 Rp. 6,357.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 157,794.00

1.2000 m3 Batu belah 15/20 Rp 300,000.00 Rp. 360,000.00


0.3000 m3 Pasir pasang Rp 165,000.00 Rp. 49,500.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 409,500.00
Jumlah Total . . . . . . . . . . Rp. 567,294.00

23. 1 m3 Pasang pondasi batu kali, 1Pc : 3 Pasir


0.6000 h.o tukang batu Rp 138,000.00 Rp. 82,800.00
0.0600 h.o kepala tukang Rp 143,000.00 Rp. 8,580.00
1.5000 h.o pekerja Rp 118,000.00 Rp. 177,000.00
0.0750 h.o mandor Rp 163,000.00 Rp. 12,225.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 280,605.00

1.1000 m3 Batu belah 15/20 Rp 300,000.00 Rp. 330,000.00


4.0400 sak Semen Portland 50kg Rp 58,000.00 Rp 234,320.00
0.4850 m3 Pasir pasang Rp 165,000.00 Rp 80,025.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 644,345.00

Jumlah Total . . . . . . . . . . Rp. 924,950.00

24. 1 m3 Pasang pondasi batu kali, 1Pc : 4 Pasir


0.6000 h.o tukang batu Rp 138,000.00 Rp. 82,800.00
0.0600 h.o kepala tukang Rp 143,000.00 Rp. 8,580.00
1.5000 h.o pekerja Rp 118,000.00 Rp. 177,000.00
0.0750 h.o mandor Rp 163,000.00 Rp. 12,225.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 280,605.00

1.1000 m3 Batu belah 15/20 Rp 300,000.00 Rp. 330,000.00


3.2600 sak Semen Portland 50kg Rp 58,000.00 Rp 189,080.00
0.5200 m3 Pasir pasang Rp 165,000.00 Rp 85,800.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 604,880.00

Jumlah Total . . . . . . . . . . Rp. 885,485.00

25. 1 m3 Pasang pondasi sumuran diameter 100 cm


0.3000 h.o tukang batu Rp 138,000.00 Rp. 41,400.00
0.0300 h.o kepala tukang Rp 143,000.00 Rp. 4,290.00
2.3800 h.o pekerja Rp 118,000.00 Rp. 280,840.00
0.0800 h.o mandor Rp 163,000.00 Rp. 13,040.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 339,570.00

0.4500 m3 Batu belah 15/20 Rp 300,000.00 Rp. 135,000.00


5.6000 sak Semen Portland 50kg Rp 58,000.00 Rp 324,800.00
0.6700 m3 Batu pecah Rp 450,000.00 Rp 301,500.00
0.4500 m3 Pasir pasang Rp 165,000.00 Rp 74,250.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 835,550.00

Jumlah Total . . . . . . . . . . Rp. 1,175,120.00

26. 1 m2 Pasangan bata merah tebal 1 bata, 1PC : 1 Pasir


0.2000 h.o Tukang batu Rp 138,000.00 Rp. 27,600.00
0.0200 h.o Kepala tukang Rp 143,000.00 Rp. 2,860.00
0.6500 h.o Pekerja Rp 118,000.00 Rp. 76,700.00
0.0300 h.o Mandor Rp 163,000.00 Rp. 4,890.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 112,050.00

140.0000 bh Bata merah ( 5 x 11 x 22 cm) Rp 1,000.00 Rp 140,000.00


1.2806 sak Semen Portland 50kg Rp 58,000.00 Rp 74,274.80
0.0590 m3 Pasir pasang Rp 165,000.00 Rp 9,735.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 224,009.80

Jumlah Total . . . . . . . . . . Rp. 336,059.80

27. 1 m2 Pasangan bata merah tebal 1 bata, 1PC : 2 Pasir


0.2000 h.o Tukang batu Rp 138,000.00 Rp. 27,600.00
0.0200 h.o Kepala tukang Rp 143,000.00 Rp. 2,860.00
0.6500 h.o Pekerja Rp 118,000.00 Rp. 76,700.00
0.0300 h.o Mandor Rp 163,000.00 Rp. 4,890.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 112,050.00
140.0000 bh Bata merah ( 5 x 11 x 22 cm) Rp 1,000.00 Rp 140,000.00
0.8700 sak Semen Portland 50kg Rp 58,000.00 Rp 50,460.00
0.0800 m3 Pasir pasang Rp 165,000.00 Rp 13,200.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 203,660.00

Jumlah Total . . . . . . . . . . Rp. 315,710.00

28. 1 m2 Pasangan bata merah tebal 1 bata, 1PC : 3 Pasir


0.2000 h.o Tukang batu Rp 138,000.00 Rp. 27,600.00
0.0200 h.o Kepala tukang Rp 143,000.00 Rp. 2,860.00
0.6500 h.o Pekerja Rp 118,000.00 Rp. 76,700.00
0.0300 h.o Mandor Rp 163,000.00 Rp. 4,890.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 112,050.00

140.0000 bh Bata merah ( 5 x 11 x 22 cm) Rp 1,000.00 Rp 140,000.00


0.6590 sak Semen Portland 50kg Rp 58,000.00 Rp 38,222.00
0.0910 m3 Pasir pasang Rp 165,000.00 Rp 15,015.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 193,237.00

Jumlah Total . . . . . . . . . . Rp. 305,287.00

29. 1 m2 Pasangan bata merah tebal 1 bata, 1PC : 4 Pasir


0.2000 h.o Tukang batu Rp 138,000.00 Rp. 27,600.00
0.0200 h.o Kepala tukang Rp 143,000.00 Rp. 2,860.00
0.6500 h.o Pekerja Rp 118,000.00 Rp. 76,700.00
0.0300 h.o Mandor Rp 163,000.00 Rp. 4,890.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 112,050.00

140.0000 bh Bata merah ( 5 x 11 x 22 cm) Rp 1,000.00 Rp 140,000.00


0.5310 sak Semen Portland 50kg Rp 58,000.00 Rp 30,798.00
0.0930 m3 Pasir pasang Rp 165,000.00 Rp 15,345.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 186,143.00

Jumlah Total . . . . . . . . . . Rp. 298,193.00

30. 1 m2 Pasangan bata merah tebal 1 bata, 1PC : 5 Pasir


0.2000 h.o Tukang batu Rp 138,000.00 Rp. 27,600.00
0.0200 h.o Kepala tukang Rp 143,000.00 Rp. 2,860.00
0.6500 h.o Pekerja Rp 118,000.00 Rp. 76,700.00
0.0300 h.o Mandor Rp 163,000.00 Rp. 4,890.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 112,050.00
140.0000 bh Bata merah ( 5 x 11 x 22 cm) Rp 1,000.00 Rp 140,000.00
0.4440 sak Semen Portland 50kg Rp 58,000.00 Rp 25,752.00
0.1020 m3 Pasir pasang Rp 165,000.00 Rp 16,830.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 182,582.00

Jumlah Total . . . . . . . . . . Rp. 294,632.00

31. 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 1 Pasir


0.1000 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.0100 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.3200 h.o Pekerja Rp 118,000.00 Rp. 37,760.00
0.0150 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 55,435.00

70.0000 bh Bata merah ( 5 x 11 x 22 cm) Rp 1,000.00 Rp 70,000.00


0.5560 sak Semen Portland 50kg Rp 58,000.00 Rp 32,248.00
0.0280 m3 Pasir pasang Rp 165,000.00 Rp 4,620.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 106,868.00
Jumlah Total . . . . . . . . . . Rp. 162,303.00

32. 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 2 Pasir


0.1000 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.0100 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.3200 h.o Pekerja Rp 118,000.00 Rp. 37,760.00
0.0150 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 55,435.00

70.0000 bh Bata merah ( 5 x 11 x 22 cm) Rp 1,000.00 Rp 70,000.00


0.3790 sak Semen Portland 50kg Rp 58,000.00 Rp 21,982.00
0.0380 m3 Pasir pasang Rp 165,000.00 Rp 6,270.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 98,252.00

Jumlah Total . . . . . . . . . . Rp. 153,687.00


33. 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 3 Pasir
0.1000 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.0100 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.3000 h.o Pekerja Rp 118,000.00 Rp. 35,400.00
0.0150 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 53,075.00
70.0000 bh Bata merah ( 5 x 11 x 22 cm) Rp 750.00 Rp 52,500.00
0.2874 sak Semen Portland 50kg Rp 58,000.00 Rp 16,669.20
0.0400 m3 Pasir pasang Rp 165,000.00 Rp 6,600.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 75,769.20
Jumlah Total . . . . . . . . . . Rp. 128,844.20
Overhead + Profit (15%) Rp. 19,326.63
Jumlah Total Rp. 148,170.83

34. 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 4 Pasir


0.1000 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.0100 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.3200 h.o Pekerja Rp 118,000.00 Rp. 37,760.00
0.0150 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 55,435.00

70.0000 bh Bata merah ( 5 x 11 x 22 cm) Rp 750.00 Rp 52,500.00


0.2300 sak Semen Portland 50kg Rp 58,000.00 Rp 13,340.00
0.0430 m3 Pasir pasang Rp 165,000.00 Rp 7,095.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 72,935.00

Jumlah Total . . . . . . . . . . Rp. 128,370.00

35. 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 5 Pasir


0.1000 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.0100 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.3200 h.o Pekerja Rp 118,000.00 Rp. 37,760.00
0.0150 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 55,435.00
70.0000 bh Bata merah ( 5 x 11 x 22 cm) Rp 750.00 Rp 52,500.00
0.1936 sak Semen Portland 50kg Rp 58,000.00 Rp 11,228.80
0.0450 m3 Pasir pasang Rp 165,000.00 Rp 7,425.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 71,153.80
Jumlah Total . . . . . . . . . . Rp. 126,588.80

36. 1 m2 Pasangan dinding roster/terawang (12 x 11 x 24) cm


0.1000 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.0100 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.3000 h.o Pekerja Rp 118,000.00 Rp. 35,400.00
0.0150 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 53,075.00

36.0000 bh Roster/terawang Rp - Rp -
0.2560 sak Semen Portland 50kg Rp 58,000.00 Rp 14,848.00
0.0350 m3 Pasir pasang Rp 165,000.00 Rp 5,775.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 20,623.00
Jumlah Total . . . . . . . . . . Rp. 73,698.00

37. 1 m2 Plesteran trasram 1 PC : 1 pasir, tebal 1,5 cm


0.1500 h.o tukang batu Rp 138,000.00 Rp 20,700.00
0.0150 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.2000 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.0100 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 48,075.00

0.2584 sak Semen Portland 50kg Rp 58,000.00 Rp 14,987.20


0.0130 m3 Pasir pasang Rp 165,000.00 Rp 2,145.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 17,132.20
Jumlah Total . . . . . . . . . . Rp. 65,207.20

38. 1 m2 Plesteran trasram 1 PC : 2 pasir, tebal 1,5 cm


0.1500 h.o tukang batu Rp 138,000.00 Rp 20,700.00
0.0150 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.2000 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.0100 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 48,075.00
0.1704 sak Semen Portland 50kg Rp 58,000.00 Rp 9,883.20
0.0170 m3 Pasir pasang Rp 165,000.00 Rp 2,805.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 12,688.20

Jumlah Total . . . . . . . . . . Rp. 60,763.20

39. 1 m2 Plesteran 1 PC : 3 pasir, tebal 1,5 cm


0.1500 h.o tukang batu Rp 138,000.00 Rp 20,700.00
0.0150 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.3000 h.o pekerja Rp 118,000.00 Rp 35,400.00
0.0150 h.o mandor Rp 163,000.00 Rp 2,445.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 60,690.00
0.1296 sak Semen Portland 50kg Rp 58,000.00 Rp 7,516.80
0.0230 m3 Pasir pasang Rp 165,000.00 Rp 3,795.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 11,311.80
. . . . . . . . . . Rp. 72,001.80
Overhead + Profit (15%) Rp. 10,800.27
Jumlah Total Rp. 82,802.07

40. 1 m2 Plesteran 1 PC : 4 pasir, tebal 1,5 cm


0.1500 h.o tukang batu Rp 138,000.00 Rp 20,700.00
0.0150 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.2000 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.0100 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 48,075.00

0.1040 sak Semen Portland 50kg Rp 58,000.00 Rp 6,032.00


0.0200 m3 Pasir pasang Rp 165,000.00 Rp 3,300.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 9,332.00

Jumlah Total . . . . . . . . . . Rp. 57,407.00

41. 1 m2 Plesteran 1 PC : 5 pasir, tebal 1,5 cm


0.1500 h.o tukang batu Rp 138,000.00 Rp 20,700.00
0.0150 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.2000 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.0100 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 48,075.00
0.0864 sak Semen Portland 50kg Rp 58,000.00 Rp 5,011.20
0.0220 m3 Pasir pasang Rp 165,000.00 Rp 3,630.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 8,641.20

Jumlah Total . . . . . . . . . . Rp. 56,716.20

1 m² Acian
0.2000 h.o Pekerja Rp 118,000.00 Rp 23,600.00
0.1000 h.o Tukang Rp 138,000.00 Rp 13,800.00
0.0100 h.o Kepala Tukang Rp 143,000.00 Rp 1,430.00
0.0100 h.o Mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 40,460.00
3.2500 kg Semen portland 50 kg Rp 1,160.00 Rp 3,770.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 3,770.00
. . . . . . . . . . Rp. 44,230.00
Overhead + Profit (15%) Rp. 6,634.50
Jumlah Total Rp. 50,864.50
E. PEKERJAAN PASANG LANTAI DAN DINDING

1. 1 m2 Pasang lantai ubin granito ukuran 60x60 cm


0.2400 h.o pekerja Rp 118,000.00 Rp 28,320.00
0.1200 h.o tukang batu Rp 138,000.00 Rp 16,560.00
0.0120 h.o kepala tukang Rp 143,000.00 Rp 1,716.00
0.0120 h.o mandor Rp 163,000.00 Rp 1,956.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 48,552.00
3.1000 bh Ubin granito 60x60 cm Rp 72,250.00 Rp 223,975.00
9.6000 kg Semen Portland 50kg Rp 1,160.00 Rp 11,136.00
1.3000 kg Semen warna Rp 20,000.00 Rp 26,000.00
0.0450 m3 Pasir pasang Rp 165,000.00 Rp 7,425.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 268,536.00
. . . . . . . . . . Rp. 317,088.00
Overhead + Profit (15%) Rp. 47,563.20
Jumlah Total Rp. 364,651.20

2. 1 m2 Pasang lantai ubin granito ukuran 60x60 cm


0.2400 h.o pekerja Rp 118,000.00 Rp 28,320.00
0.1200 h.o tukang batu Rp 138,000.00 Rp 16,560.00
0.0120 h.o kepala tukang Rp 143,000.00 Rp 1,716.00
0.0120 h.o mandor Rp 163,000.00 Rp 1,956.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 48,552.00
3.1000 bh Ubin granito 60x60 cm Rp 88,750.00 Rp 275,125.00
9.6000 kg Semen Portland 50kg Rp 1,160.00 Rp 11,136.00
1.3000 kg Semen warna Rp 20,000.00 Rp 26,000.00
0.0450 m3 Pasir pasang Rp 165,000.00 Rp 7,425.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 319,686.00
. . . . . . . . . . Rp. 368,238.00
Overhead + Profit (15%) Rp. 55,235.70
Jumlah Total Rp. 423,473.70

1 m2 Pasang lantai ubin granito ukuran 40x40 cm


0.2400 h.o pekerja Rp 118,000.00 Rp 28,320.00
0.1200 h.o tukang batu Rp 138,000.00 Rp 16,560.00
0.0120 h.o kepala tukang Rp 143,000.00 Rp 1,716.00
0.0120 h.o mandor Rp 163,000.00 Rp 1,956.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 48,552.00
6.6300 bh Ubin granito 40x40 cm Rp 41,666.67 Rp 276,250.00
0.1960 zak Semen Portland 50kg Rp 58,000.00 Rp 11,368.00
1.3000 kg Semen warna Rp 20,000.00 Rp 26,000.00
0.0450 m3 Pasir pasang Rp 165,000.00 Rp 7,425.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 321,043.00
. . . . . . . . . . Rp. 369,595.00
Overhead + Profit (15%) Rp. 55,439.25
Jumlah Total Rp. 425,034.25

3. 1 m2 Pasang lantai keramik


0.6200 h.o pekerja Rp 118,000.00 Rp 73,160.00
0.3500 h.o tukang batu Rp 138,000.00 Rp 48,300.00
0.0350 h.o kepala tukang Rp 143,000.00 Rp 5,005.00
0.0300 h.o mandor Rp 163,000.00 Rp 4,890.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 131,355.00

1.0000 m2 Ubin keramik Rp 58,000.00 Rp 58,000.00


0.2276 sak Semen Portland 50kg Rp 20,000.00 Rp 4,552.00
0.1500 kg Semen warna Rp 165,000.00 Rp 24,750.00
0.0420 m3 Pasir pasang Rp . Rp #VALUE!
Jumlah Biaya bahan . . . . . . . . . . Rp. #VALUE!

Jumlah Total . . . . . . . . . . Rp. #VALUE!

4. 1 m2 Pasang lantai mozaik


0.6200 h.o pekerja Rp 118,000.00 Rp 73,160.00
0.3500 h.o tukang batu Rp 138,000.00 Rp 48,300.00
0.0350 h.o kepala tukang Rp 143,000.00 Rp 5,005.00
0.0300 h.o mandor Rp 163,000.00 Rp 4,890.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 131,355.00

1.0800 m2 Mozaik Rp 58,000.00 Rp 62,640.00


0.2830 sak Semen Portland 50kg Rp 20,000.00 Rp 5,660.00
0.2000 kg Semen warna Rp 165,000.00 Rp 33,000.00
0.0390 m3 Pasir pasang Rp . Rp #VALUE!
Jumlah Biaya bahan . . . . . . . . . . Rp. #VALUE!

Jumlah Total . . . . . . . . . . Rp. #VALUE!

5. 1 m2 Pasang lantai marmer


0.6200 h.o pekerja Rp 118,000.00 Rp 73,160.00
0.3500 h.o tukang batu Rp 138,000.00 Rp 48,300.00
0.0350 h.o kepala tukang Rp 143,000.00 Rp 5,005.00
0.0300 h.o mandor Rp 163,000.00 Rp 4,890.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 131,355.00

1.0520 m2 Marmer Rp 350,000.00 Rp 368,200.00


0.2830 sak Semen Portland 50kg Rp 20,000.00 Rp 5,660.00
0.2000 kg Semen warna Rp 165,000.00 Rp 33,000.00
0.0390 m3 Pasir pasang Rp . Rp #VALUE!
Jumlah Biaya bahan . . . . . . . . . . Rp. #VALUE!

Jumlah Total . . . . . . . . . . Rp. #VALUE!


6. 1 m2 Pasang lantai karpet
0.1700 h.o pekerja Rp 118,000.00 Rp 20,060.00
0.1700 h.o tukang batu Rp 138,000.00 Rp 23,460.00
0.0170 h.o kepala tukang Rp 143,000.00 Rp 2,431.00
0.0085 h.o mandor Rp 163,000.00 Rp 1,385.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 47,336.50

1.0520 m2 Karpet Rp 75,000.00 Rp 78,900.00


0.3500 kg Lem vinyl Rp 11,000.00 Rp 3,850.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 82,750.00

Jumlah Total . . . . . . . . . . Rp. 130,086.50

7. 1 m2 Pasang dinding porselin, keramik


0.6200 h.o pekerja Rp 118,000.00 Rp 73,160.00
0.5000 h.o tukang batu Rp 138,000.00 Rp 69,000.00
0.0500 h.o kepala tukang Rp 143,000.00 Rp 7,150.00
0.0300 h.o mandor Rp 163,000.00 Rp 4,890.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 154,200.00

1.0000 m2 Porselin/keramik Rp 45,000.00 Rp 45,000.00


0.1860 sak Semen Portland 50kg Rp 20,000.00 Rp 3,720.00
0.0180 m3 Pasir pasang Rp . Rp #VALUE!
0.1500 kg Semen warna Rp 165,000.00 Rp 24,750.00
Jumlah Biaya bahan . . . . . . . . . . Rp. #VALUE!

Jumlah Total . . . . . . . . . . Rp. #VALUE!

8. 1 m2 Pasang dinding marmer


0.7200 h.o pekerja Rp 118,000.00 Rp 84,960.00
0.6500 h.o tukang batu Rp 138,000.00 Rp 89,700.00
0.0650 h.o kepala tukang Rp 143,000.00 Rp 9,295.00
0.0350 h.o mandor Rp 163,000.00 Rp 5,705.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 189,660.00

1.0200 m2 Marmer Rp 350,000.00 Rp 357,000.00


2.0000 bh Paku pancing 60 x 230 Rp 5,000.00 Rp 10,000.00
0.2488 sak Semen Portland 50kg Rp 20,000.00 Rp 4,976.00
0.0250 m3 Pasir pasang Rp . Rp #VALUE!
0.1500 kg Semen warna Rp 165,000.00 Rp 24,750.00
Jumlah Biaya bahan . . . . . . . . . . Rp. #VALUE!

Jumlah Total . . . . . . . . . . Rp. #VALUE!

9. 1 m2 Pasang dinding batu tempel


0.6200 h.o pekerja Rp 118,000.00 Rp 73,160.00
0.3500 h.o tukang batu Rp 138,000.00 Rp 48,300.00
0.0350 h.o kepala tukang Rp 143,000.00 Rp 5,005.00
0.0300 h.o mandor Rp 163,000.00 Rp 4,890.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 131,355.00

1.0500 m2 Batu tempel Rp 95,000.00 Rp 99,750.00


0.2350 sak Semen Portland 50kg Rp 20,000.00 Rp 4,700.00
0.0350 m3 Pasir pasang Rp . Rp #VALUE!
Jumlah Biaya bahan . . . . . . . . . . Rp. #VALUE!

Jumlah Total . . . . . . . . . . Rp. #VALUE!

1 m2 Pasang Floor Hardener


0.1200 h.o pekerja Rp 118,000.00 Rp 14,160.00
0.1200 h.o tukang batu Rp 138,000.00 Rp 16,560.00
0.1200 h.o kepala tukang Rp 143,000.00 Rp 17,160.00
0.0060 h.o mandor Rp 163,000.00 Rp 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 48,858.00
5.0000 kg Floor hardener Rp 10,847.00 Rp 54,235.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 54,235.00
. . . . . . . . . . Rp. 103,093.00
Overhead + Profit (15%) Rp. 10,309.30
Jumlah Total Rp. 113,402.30
F PEKERJAAN PEMANCANGAN

1. 1 bh Handling dan Transport tiang pancang dari penimbunan ke titik pancang


8.4000 h.o pekerja Rp 118,000.00 Rp 991,200.00
0.8000 h.o tukang pancang Rp 138,000.00 Rp 110,400.00
1.0000 ls Alat bantu Rp 105,000.00 Rp 105,000.00
Jumlah Total . . . . . . . . . . Rp. 1,206,600.00

2. 1 Titik Pemancangan tiang pancang tegak di laut


12.1000 h.o pekerja Rp 118,000.00 Rp 1,427,800.00
11.0000 h.o tukang pancang Rp 138,000.00 Rp 1,518,000.00
2.6800 h.o tukang las Rp 138,000.00 Rp 369,840.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 3,315,640.00
36.0000 kg kawat las Rp 135,000.00 Rp 4,860,000.00
0.5500 tbg oksigen Rp - Rp -
0.2800 tbg elpiji Rp - Rp -
Jumlah Biaya Bahan . . . . . . . . . . Rp. 4,860,000.00

0.8112 h.a Sewa Ponton dengan mesin pancang Rp - Rp -


0.8112 h.a Sewa Ponton kerja Rp - Rp -
0.7240 h.a Sewa Mesin las Rp - Rp -
0.7240 h.a Sewa Blender potong Rp - Rp -
1.0000 ls Alat bantu Rp 105,000.00 Rp 105,000.00
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah Total . . . . . . . . . . Rp. 8,175,640.00

3. 1 cm Pengelasan/memotong baja
0.0017 h.o pekerja Rp 118,000.00 Rp 196.67
0.0033 h.o tukang las Rp 138,000.00 Rp 460.00
0.0008 h.o kepala tukang Rp 143,000.00 Rp 119.17
Jumlah Upah Kerja . . . . . . . . . . Rp. 775.83

0.0083 kg kawat las Rp 135,000.00 Rp 1,125.00


0.0017 h.a diesel las Rp - Rp -
1.0000 ls spare part Rp 1,000.00 Rp 1,000.00
1.0000 ls alat bantu Rp 1,000.00 Rp 1,000.00
Jumlah Biaya Bahan & Peralatan . . . . . . . . . . Rp. 3,125.00

Jumlah Total . . . . . . . . . . Rp. 3,900.83

4. 1 m2 Pelapisan epoxy/tar tiang pancang


0.5000 h.o pekerja Rp 118,000.00 Rp 59,000.00
0.2500 h.o tukang cat Rp 138,000.00 Rp 34,500.00
0.0250 h.o mandor Rp 163,000.00 Rp 4,075.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 97,575.00

0.4600 kg cat epoxy/tar Rp 95,000.00 Rp 43,700.00


0.1400 ltr minyak perekat Rp - Rp -
0.0700 ltr thinner Rp - Rp -
1.0000 ls alat bantu Rp 75,000.00 Rp 75,000.00
Jumlah Biaya Bahan & Peralatan . . . . . . . . . . Rp. 118,700.00
Jumlah Total . . . . . . . . . . Rp. 216,275.00

5. 1 bh Sambungan tiang pancang beton/spun pile f 50 cm


471.0000 cm Pengelasan 3x Rp 3,900.83 Rp 1,837,292.50
0.6280 m2 Pengecatan epoxy/tar Rp 216,275.00 Rp 135,820.70
Jumlah Total . . . . . . . . . . Rp. 1,973,113.20

6. 1 bh Sambungan tiang pancang baja f 50 cm


6.0000 kg Besi pelat/baja tulangan f 19mm Rp - Rp -
471.0000 cm Pengelasan 3x Rp 3,900.83 Rp 1,837,292.50
0.6280 m2 Pelapisan epoxy/tar Rp 216,275.00 Rp 135,820.70
Jumlah Total . . . . . . . . . . Rp. 1,973,113.20

7. 1 bh Memotong tiang pancang beton/spun pile, tiang pancang baja f 50 cm


1.0000 h.o pekerja Rp 118,000.00 Rp 118,000.00
0.3900 h.o mandor Rp 163,000.00 Rp 63,570.00
157.0000 cm memotong baja Rp 3,900.83 Rp 612,430.83
0.1000 h.a ponton kerja Rp - Rp -
Jumlah Total . . . . . . . . . . Rp. 794,000.83
G PEKERJAAN ATAP

1. 1 m2 Pasang atap genteng


0.1500 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.0750 h.o tukang kayu Rp 138,000.00 Rp 10,350.00
0.0080 h.o kepala tukang Rp 143,000.00 Rp 1,144.00
0.0080 h.o mandor Rp 163,000.00 Rp 1,304.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 30,498.00

25.0000 bh genteng (biasa/kodok) Rp - Rp -


Jumlah Biaya bahan . . . . . . . . . . Rp. -
Jumlah Total . . . . . . . . . . Rp. 30,498.00

2. 1 m' Pasang nok/bubungan genteng


0.4000 h.o pekerja Rp 118,000.00 Rp 47,200.00
0.2000 h.o tukang kayu Rp 138,000.00 Rp 27,600.00
0.0200 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.0020 h.o mandor Rp 163,000.00 Rp 326.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 77,986.00

5.0000 bh bubungan genteng (biasa/kodok) Rp - Rp -


0.1600 sak Semen portland 50kg Rp 1,160.00 Rp 185.60
0.0320 m3 Pasir pasang Rp 165,000.00 Rp 5,280.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 5,465.60

Jumlah Total . . . . . . . . . . Rp. 83,451.60

3. 1 m2 Pasang atap genteng beton


0.2000 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.1000 h.o tukang kayu Rp 138,000.00 Rp 13,800.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.0100 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 40,460.00
11.0000 bh genteng beton Rp - Rp -
0.0300 kg Paku biasa 2" - 5" Rp 45,000.00 Rp 1,350.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 1,350.00
Jumlah Total . . . . . . . . . . Rp. 41,810.00

4. 1 m' Pasang nok/bubungan genteng beton


0.4000 h.o pekerja Rp 118,000.00 Rp 47,200.00
0.2000 h.o tukang kayu Rp 138,000.00 Rp 27,600.00
0.0200 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.0020 h.o mandor Rp 163,000.00 Rp 326.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 77,986.00

3.5000 bh bubungan genteng beton Rp - Rp -


0.2160 sak Semen portland 50kg Rp 1,160.00 Rp 250.56
0.0500 kg Paku biasa 2" - 5" Rp 45,000.00 Rp 2,250.00
1.0000 kg Semen warna Rp 165,000.00 Rp 165,000.00
0.0320 m3 Pasir pasang Rp 165,000.00 Rp 5,280.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 172,780.56

Jumlah Total . . . . . . . . . . Rp. 250,766.56

5. 1 m2 Pasang atap sirap


0.1660 h.o pekerja Rp 118,000.00 Rp 19,588.00
0.2500 h.o tukang kayu Rp 138,000.00 Rp 34,500.00
0.0250 h.o kepala tukang Rp 143,000.00 Rp 3,575.00
0.0080 h.o mandor Rp 163,000.00 Rp 1,304.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 58,967.00

60.0000 bh Atap sirap Rp 15,000.00 Rp 900,000.00


0.2000 kg Paku biasa 1/2" - 1" Rp 45,000.00 Rp 9,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 909,000.00

Jumlah Total . . . . . . . . . . Rp. 967,967.00

6. 1 m' Pasang nok/bubungan sirap


0.1250 h.o pekerja Rp 118,000.00 Rp 14,750.00
0.2500 h.o tukang kayu Rp 138,000.00 Rp 34,500.00
0.0250 h.o kepala tukang Rp 143,000.00 Rp 3,575.00
0.0060 h.o mandor Rp 163,000.00 Rp 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 53,803.00
0.4000 lbr Seng plat 3" x 6" BJLS 28 Rp 58,000.00 Rp 23,200.00
0.0600 kg Paku biasa 1/2" - 1" Rp 20,000.00 Rp 1,200.00
0.0500 kg Paku biasa 2" - 5" Rp 20,000.00 Rp 1,000.00
0.0040 m3 Papan kayu tebal 3 cm Rp 15,000,000.00 Rp 60,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 85,400.00

Jumlah Total . . . . . . . . . . Rp. 139,203.00

7. 1 m' Pasang atap genteng metal (multy roof)


0.2000 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.1000 h.o tukang kayu Rp 138,000.00 Rp 13,800.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.0010 h.o mandor Rp 163,000.00 Rp 163.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 38,993.00

1.8000 lbr Genteng metal Rp - Rp -


0.0500 kg Paku biasa 2" - 5" Rp 20,000.00 Rp 1,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 1,000.00

Jumlah Total . . . . . . . . . . Rp. 39,993.00

8. 1 m' Pasang nok/bubungan genteng metal


0.2500 h.o pekerja Rp 118,000.00 Rp 29,500.00
0.1500 h.o tukang kayu Rp 138,000.00 Rp 20,700.00
0.0150 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.0130 h.o mandor Rp 163,000.00 Rp 2,119.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 54,464.00

1.1000 bh Genteng decra bond Rp 45,000.00 Rp 49,500.00


0.0500 kg Paku biasa 1/2" - 1" Rp 20,000.00 Rp 1,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 50,500.00

Jumlah Total . . . . . . . . . . Rp. 104,964.00

9. 1 m2 Pasang atap seng gelombang


0.1200 h.o pekerja Rp 118,000.00 Rp. 14,160.00
0.0600 h.o tukang kayu Rp 138,000.00 Rp. 8,280.00
0.0060 h.o kepala tukang Rp 143,000.00 Rp. 858.00
0.0060 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp 24,276.00
0.7000 lbr Seng gelombang 3" x 6" BJLS …. Rp. 58,000.00 Rp. 40,600.00
0.0200 kg Paku biasa 1/2" - 1" Rp. 20,000.00 Rp. 400.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 41,000.00

Jumlah Total . . . . . . . . . . Rp. 65,276.00

10. 1 m' Pasang nok/bubungan atap seng


0.1500 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.0700 h.o tukang kayu Rp 138,000.00 Rp. 9,660.00
0.0080 h.o kepala tukang Rp 143,000.00 Rp. 1,144.00
0.0060 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp 29,482.00

0.3000 lbr Seng pelat 3' x 6' BJLS …. Rp. 58,000.00 Rp. 17,400.00
0.0400 kg Paku biasa 1/2" - 1" Rp. 20,000.00 Rp. 800.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 18,200.00

Jumlah Total . . . . . . . . . . Rp. 47,682.00

11. 1 m2 Pasang atap spandek 3.5 mm


0.1500 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.0750 h.o tukang kayu Rp 138,000.00 Rp. 10,350.00
0.0080 h.o kepala tukang Rp 143,000.00 Rp. 1,144.00
0.0060 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp 30,172.00
1.0500 m2 Aluminium gelombang tebal 3.5 mm Rp. 55,000.00 Rp. 57,750.00
0.0200 kg Paku hak panjang 15 cm Rp. 75,000.00 Rp. 1,500.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 59,250.00
. . . . . . . . . . Rp. 89,422.00
Overhead + Profit (15%) Rp. 13,413.30
Jumlah Total Rp. 102,835.30
12. 1 m' Pasang nok/bubungan aluminium
0.1000 h.o pekerja Rp 118,000.00 Rp. 11,800.00
1.0000 h.o tukang kayu Rp 138,000.00 Rp. 138,000.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp. 1,430.00
0.0100 h.o mandor Rp 163,000.00 Rp. 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp 152,860.00

1.2000 m2 Nok standar 40 cm 18, SWG 22 Rp. 25,000.00 Rp. 30,000.00


0.0400 kg Paku hak panjang 15 cm Rp. . Rp. #VALUE!
Jumlah Biaya Bahan . . . . . . . . . . Rp #VALUE!

Jumlah Total . . . . . . . . . . Rp. #VALUE!

13. 1 m2 Pasang atap asbes gelombang


0.1400 h.o pekerja Rp 118,000.00 Rp 16,520.00
0.0750 h.o tukang kayu Rp 138,000.00 Rp 10,350.00
0.0080 h.o kepala tukang Rp 143,000.00 Rp 1,144.00
0.0080 h.o mandor Rp 163,000.00 Rp 1,304.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 29,318.00

1.2000 m2 Asbes gelombang Rp 352,000.00 Rp 422,400.00


0.1200 kg Paku pancing 60 x 230 Rp 50,000.00 Rp 6,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 428,400.00

Jumlah Total . . . . . . . . . . Rp. 457,718.00

14. 1 m' Pasang nok/bubungan stel gelombang 0,92 m


0.0840 h.o pekerja Rp 118,000.00 Rp 9,912.00
0.1250 h.o tukang kayu Rp 138,000.00 Rp 17,250.00
0.0130 h.o kepala tukang Rp 143,000.00 Rp 1,859.00
0.0040 h.o mandor Rp 163,000.00 Rp 652.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 29,673.00

2.4000 lbr Bubungan stel gelombang Rp - Rp -


6.0000 bh paku sekrup 3,5" Rp 45,000.00 Rp 270,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 270,000.00

Jumlah Total . . . . . . . . . . Rp. 299,673.00

15. 1 m' Pasang nok/bubungan stel rata 0,92 m


0.1000 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.1500 h.o tukang kayu Rp 138,000.00 Rp 20,700.00
0.0130 h.o kepala tukang Rp 143,000.00 Rp 1,859.00
0.0040 h.o mandor Rp 163,000.00 Rp 652.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 35,011.00

1.1000 lbr Bubungan stel rata Rp - Rp -


6.0000 bh paku sekrup 3,5" Rp 45,000.00 Rp 270,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 270,000.00

Jumlah Total . . . . . . . . . . Rp. 305,011.00

16. 1 m' Pasang nok/bubungan paten 0,92 m


0.0840 h.o pekerja Rp 118,000.00 Rp 9,912.00
0.1250 h.o tukang kayu Rp 138,000.00 Rp 17,250.00
0.0130 h.o kepala tukang Rp 143,000.00 Rp 1,859.00
0.0040 h.o mandor Rp 163,000.00 Rp 652.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 29,673.00

1.2000 lbr nok paten Rp 65,000.00 Rp 78,000.00


6.0000 bh paku sekrup 3,5" Rp 45,000.00 Rp 270,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 348,000.00
Jumlah Total . . . . . . . . . . Rp. 377,673.00

17. 1 m2 Pasang atap tembus cahaya dari fibreglass (180 x 90 cm)


0.1400 h.o pekerja Rp 118,000.00 Rp 16,520.00
0.0670 h.o tukang kayu Rp 138,000.00 Rp 9,246.00
0.0070 h.o kepala tukang Rp 143,000.00 Rp 1,001.00
0.0070 h.o mandor Rp 163,000.00 Rp 1,141.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 27,908.00

0.6000 lbr Rooflight Fibreglass Rp - Rp -


0.0500 kg Paku biasa 1/2" - 1" Rp 27,000.00 Rp 1,350.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 1,350.00

Jumlah Total . . . . . . . . . . Rp. 29,258.00


18. 1 m2 Pasang alas atap aluminium foil/sisalation
0.1500 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.0500 h.o tukang kayu Rp 138,000.00 Rp 6,900.00
0.0050 h.o kepala tukang Rp 143,000.00 Rp 715.00
0.0080 h.o mandor Rp 163,000.00 Rp 1,304.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 26,619.00

1.0500 m2 Sisalation/aluminium foil Rp - Rp -


Jumlah Biaya bahan . . . . . . . . . . Rp. -

Jumlah Total . . . . . . . . . . Rp. 26,619.00

H PEKERJAAN PENGECATAN
1. 1 m2 Mengerok karat cat lama permukaan baja (manual)
0.1500 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 18,107.50

0.0500 bh Sikat besi Rp 15,000.00 Rp 750.00


Jumlah Biaya peralatan . . . . . . . . . . Rp. 750.00

Jumlah Total . . . . . . . . . . Rp. 18,857.50

2. 1 m2 Mengikis/mengerok permukaan cat tembok lama


0.1500 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 18,107.50

0.0500 kg Soda api Rp 20,000.00 Rp 1,000.00


Jumlah Biaya bahan . . . . . . . . . . Rp. 1,000.00

Jumlah Total . . . . . . . . . . Rp. 19,107.50

3. 1 m2 Membersihkan permukaan tembok yang pernah dicat


0.1500 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 18,107.50

0.0500 kg Sabun Rp 25,000.00 Rp 1,250.00


Jumlah Biaya bahan . . . . . . . . . . Rp. 1,250.00

Jumlah Total . . . . . . . . . . Rp. 19,357.50

4. 1 m2 Mengerok karat/cat lama permukaan baja dengan sand blasting, tingkat kebersihan Sa 2 1/2
1.6000 h.o pekerja Rp 118,000.00 Rp 188,800.00
1.6000 h.o tukang blasting Rp 138,000.00 Rp 220,800.00
0.8000 h.o kepala tukang Rp 143,000.00 Rp 114,400.00
0.5000 h.o mandor Rp 163,000.00 Rp 81,500.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 605,500.00

40.0000 kg Pasir Silika Rp 1,000.00 Rp 40,000.00


10.0000 ltr Solar Rp 7,000.00 Rp 70,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 40,000.00

1.0000 h.a Kompressor, blasting pot, selang Rp - Rp -


dan nozzle
Jumlah Biaya Peralatan . . . . . . . . . . Rp. -

Jumlah Total . . . . . . . . . . Rp. 645,500.00

5. 1 m2 Melabur tembok dengan kapur sirih


0.1500 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.0010 h.o tukang cat Rp 138,000.00 Rp 138.00
0.0001 h.o kepala tukang Rp 143,000.00 Rp 14.30
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 18,259.80

0.1000 lbr Kertas Ampelas Rp - Rp -


0.2500 ikat Alang-alang Rp 1,500.00 Rp 375.00
0.0020 m3 Perancah kayu Rp 2,200,000.00 Rp 4,400.00
0.1500 kg Kapur sirih Rp - Rp -
Jumlah Biaya bahan . . . . . . . . . . Rp. 4,775.00

Jumlah Total . . . . . . . . . . Rp. 23,034.80

6. 1 m2 Melabur tembok lama dengan kapur sirih (untuk pemeliharaan)


0.0400 h.o pekerja Rp 118,000.00 Rp 4,720.00
0.0050 h.o tukang cat Rp 138,000.00 Rp 690.00
0.0005 h.o kepala tukang Rp 143,000.00 Rp 71.50
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 5,889.00
0.0020 m3 Perancah kayu Rp 2,200,000.00 Rp 4,400.00
0.3000 kg Kapur sirih Rp - Rp -
Jumlah Biaya bahan . . . . . . . . . . Rp. 4,400.00

Jumlah Total . . . . . . . . . . Rp. 10,289.00

7. 1 m2 Pengecatan tembok baru ( 1x lapis plamur, 1x lapis cat dasar, 2x cat penutup)
0.0200 h.o pekerja Rp 118,000.00 Rp 2,360.00
0.0630 h.o tukang cat Rp 138,000.00 Rp 8,694.00
0.0063 h.o kepala tukang Rp 143,000.00 Rp 900.90
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 12,362.40
0.1000 kg Plamur Rp 24,000.00 Rp 2,400.00
0.1000 kg Cat dasar Rp 37,000.00 Rp 3,700.00
0.3600 kg Cat Penutup Rp 65,000.00 Rp 23,400.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 29,500.00
. . . . . . . . . . Rp. 41,862.40
Overhead + Profit (15%) Rp. 4,186.24
Jumlah Total Rp. 46,048.64

8. 1 m2 Pengecatan tembok lama ( 3x lapis cat tembok )


0.0280 h.o pekerja Rp 118,000.00 Rp 3,304.00
0.0420 h.o tukang cat Rp 138,000.00 Rp 5,796.00
0.0042 h.o kepala tukang Rp 143,000.00 Rp 600.60
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 10,108.10

0.3000 kg Cat tembok 3x Rp 65,000.00 Rp 19,500.00


Jumlah Biaya bahan . . . . . . . . . . Rp. 19,500.00

Jumlah Total . . . . . . . . . . Rp. 29,608.10

9. 1 m2 Pengecatan plafond baru ( 1x lapis plamur, 3x lapis cat tembok)


0.0300 h.o pekerja Rp 118,000.00 Rp 3,540.00
0.0945 h.o tukang cat Rp 138,000.00 Rp 13,041.00
0.0095 h.o kepala tukang Rp 143,000.00 Rp 1,351.35
0.0038 h.o mandor Rp 163,000.00 Rp 611.25
Jumlah Upah Kerja . . . . . . . . . . Rp. 18,543.60
0.1200 kg Plamur Rp 24,000.00 Rp 2,880.00
0.4320 kg Cat tembok 3x Rp 65,000.00 Rp 28,080.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 30,960.00
. . . . . . . . . . Rp. 49,503.60
Overhead + Profit (15%) Rp. 7,425.54
Jumlah Total Rp. 56,929.14

10. 1 m2 Pengecatan plafond lama ( 3x lapis cat tembok )


0.0420 h.o pekerja Rp 118,000.00 Rp 4,956.00
0.0630 h.o tukang cat Rp 138,000.00 Rp 8,694.00
0.0063 h.o kepala tukang Rp 143,000.00 Rp 900.90
0.0038 h.o mandor Rp 163,000.00 Rp 611.25
Jumlah Upah Kerja . . . . . . . . . . Rp. 15,162.15

0.3600 kg Cat tembok 3x Rp . Rp #VALUE!


Jumlah Biaya bahan . . . . . . . . . . Rp. #VALUE!

Jumlah Total . . . . . . . . . . Rp. #VALUE!

11. 1 m2 Pasang wallpaper


0.0200 h.o pekerja Rp 118,000.00 Rp 2,360.00
0.2000 h.o tukang wallpaper Rp 138,000.00 Rp 27,600.00
0.0020 h.o kepala tukang Rp 143,000.00 Rp 286.00
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 30,653.50

1.2000 m2 Wallpaper Rp - Rp -
0.2000 kg Lem Rp 11,000.00 Rp 2,200.00
Jumlah Biaya bahan . . . . . . . . . . Rp. -

Jumlah Total . . . . . . . . . . Rp. 30,653.50

12. 1 m2 Mendempul dan menggosok kayu


0.0400 h.o pekerja Rp 118,000.00 Rp 4,720.00
0.0400 h.o tukang cat Rp 138,000.00 Rp 5,520.00
0.0040 h.o kepala tukang Rp 143,000.00 Rp 572.00
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 11,219.50
0.0800 kg Dempul jadi Rp - Rp -
0.0200 kg Minyak cat Rp - Rp -
0.0100 kg Batu apung Rp 15,000.00 Rp 150.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 150.00

Jumlah Total . . . . . . . . . . Rp. 11,369.50


13. 1 m2 Pengecatan bidang kayu lama
0.0700 h.o pekerja Rp 118,000.00 Rp 8,260.00
0.0750 h.o tukang cat Rp 138,000.00 Rp 10,350.00
0.0075 h.o kepala tukang Rp 143,000.00 Rp 1,072.50
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 20,090.00

0.1500 kg Plamur Rp - Rp -
0.1700 kg Cat dasar Rp - Rp -
0.1700 kg Cat penutup Rp - Rp -
Jumlah Biaya bahan . . . . . . . . . . Rp. -

Jumlah Total . . . . . . . . . . Rp. 20,090.00

14. 1 m2 Pengecatan bidang kayu baru ( 1x lapis plamur, 3x lapis cat kayu )
0.0700 h.o pekerja Rp 118,000.00 Rp 8,260.00
0.0090 h.o tukang cat Rp 138,000.00 Rp 1,242.00
0.0060 h.o kepala tukang Rp 143,000.00 Rp 858.00
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 10,767.50

0.1500 kg Plamur Rp - Rp -
0.2000 kg Cat meni Rp - Rp -
0.4300 kg Cat kayu 3x Rp - Rp -
Jumlah Biaya bahan . . . . . . . . . . Rp. -

Jumlah Total . . . . . . . . . . Rp. 10,767.50

15. 1 m2 Pelaburan bidang kayu dengan teak oil


0.0400 h.o pekerja Rp 118,000.00 Rp 4,720.00
0.0630 h.o tukang cat Rp 138,000.00 Rp 8,694.00
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 13,821.50

0.3600 ltr Teak oil Rp 27,000.00 Rp 9,720.00


Jumlah Biaya bahan . . . . . . . . . . Rp. 9,720.00

Jumlah Total . . . . . . . . . . Rp. 23,541.50

16. 1 m2 Pelaburan bidang kayu dengan politur


0.0600 h.o tukang cat Rp 138,000.00 Rp 8,280.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 8,280.00

0.1500 ltr Politur Rp 27,000.00 Rp 4,050.00


0.3720 ltr Politur jadi Rp 27,000.00 Rp 10,044.00
2.0000 lbr Kertas Ampelas Rp 24,000.00 Rp 48,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 62,094.00

Jumlah Total . . . . . . . . . . Rp. 70,374.00

17. 1 m2 Pelaburan bidang kayu dengan cat residu dan ter


0.1000 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.0060 h.o mandor Rp 163,000.00 Rp 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 12,778.00

0.3500 ltr Residu atau ter Rp 37,000.00 Rp 12,950.00


Jumlah Biaya bahan . . . . . . . . . . Rp. 12,950.00

Jumlah Total . . . . . . . . . . Rp. 25,728.00

18. 1 m2 Pelaburan bidang kayu dengan vernis


0.1600 h.o pekerja Rp 118,000.00 Rp 18,880.00
0.1600 h.o tukang cat Rp 138,000.00 Rp 22,080.00
0.0160 h.o kepala tukang Rp 143,000.00 Rp 2,288.00
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 43,655.50

0.1500 ltr Vernis Rp 27,000.00 Rp 4,050.00


0.0500 kg Dempul Rp - Rp -
0.1000 lbr Kertas Ampelas Rp 24,000.00 Rp 2,400.00
0.0100 bh Kuas Rp 10,000.00 Rp 100.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 6,550.00

Jumlah Total . . . . . . . . . . Rp. 50,205.50


19. 1 m2 Pengecatan permukaan baja dengan meni besi
0.0200 h.o pekerja Rp 118,000.00 Rp 2,360.00
0.2000 h.o tukang cat Rp 138,000.00 Rp 27,600.00
0.0200 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.0100 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 34,450.00
0.1000 kg Meni besi Rp 35,000.00 Rp 3,500.00
0.0100 bh Kuas Rp 13,000.00 Rp 130.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 3,630.00
. . . . . . . . . . Rp. 38,080.00
Overhead + Profit (15%) Rp. 5,712.00
Jumlah Total Rp. 43,792.00

20. 1 m2 Pengecatan permukaan baja dengan meni besi


0.0200 h.o pekerja Rp 118,000.00 Rp 2,360.00
0.2000 h.o tukang cat Rp 138,000.00 Rp 27,600.00
0.0200 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.0100 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 32,090.00

0.1000 kg Meni besi Rp 63,000.00 Rp 6,300.00


0.0100 bh Kuas Rp 10,000.00 Rp 100.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 6,400.00

Jumlah Total . . . . . . . . . . Rp. 38,490.00

I PEKERJAAN BONGKARAN
1 m2 Membongkar dinding tebal 2 bata merah (dipakai lagi)
0.2240 h.o pekerja Rp 118,000.00 Rp 26,432.00
0.0224 h.o mandor Rp 163,000.00 Rp 3,651.20
Jumlah Upah Kerja . . . . . . . . . . Rp 30,083.20
Overhead + Profit (15%) Rp. 4,512.48
Jumlah Total Rp. 34,595.68

1. 1 m2 Membongkar dinding tebal 2 bata merah (dipakai lagi)


0.2240 h.o pekerja Rp 118,000.00 Rp 26,432.00
0.0224 h.o mandor Rp 163,000.00 Rp 3,651.20
Jumlah Upah Kerja . . . . . . . . . . Rp 30,083.20

2. 1 m2 Membongkar dinding tebal < 2 bata merah (dipakai lagi)


0.1120 h.o pekerja Rp 118,000.00 Rp 13,216.00
0.0056 h.o mandor Rp 163,000.00 Rp 912.80
Jumlah Upah Kerja . . . . . . . . . . Rp 14,128.80

3. 1 m2 Mengupas plesteran
0.0560 h.o pekerja Rp 118,000.00 Rp 6,608.00
0.0028 h.o mandor Rp 163,000.00 Rp 456.40
Jumlah Upah Kerja . . . . . . . . . . Rp 7,064.40

4. 1 m2 Membongkar atap sirap, genteng, asbes gelombang (dipakai lagi).


0.0480 h.o pekerja Rp 118,000.00 Rp 5,664.00
0.0024 h.o mandor Rp 163,000.00 Rp 391.20
Jumlah Upah Kerja . . . . . . . . . . Rp 6,055.20

5. 1 m2 Membongkar dan menurunkan atap seng


0.0400 h.o tukang kayu Rp 138,000.00 Rp 5,520.00
0.0800 h.o pekerja Rp 118,000.00 Rp 9,440.00
Jumlah Upah Kerja . . . . . . . . . . Rp 14,960.00
Overhead + Profit (15%) Rp. 2,244.00
Jumlah Total Rp. 17,204.00

6. 1 m2 Membongkar rangka atap kayu (kayu dipakai lagi)


0.0200 h.o tukang kayu Rp 138,000.00 Rp. 2,760.00
0.0020 h.o kepala tukang Rp 143,000.00 Rp. 286.00
0.0800 h.o pekerja Rp 118,000.00 Rp. 9,440.00
0.0040 h.o mandor Rp 163,000.00 Rp. 652.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 13,138.00

7. 1 m2 Membongkar lantai papan kayu tebal 8 Cm


0.0450 h.o tukang kayu Rp 138,000.00 Rp. 6,210.00
0.0045 h.o kepala tukang Rp 143,000.00 Rp. 643.50
0.1500 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.0075 h.o mandor Rp 163,000.00 Rp. 1,222.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 25,776.00

8. 1 m3 Membongkar balok gelagar (kayu dipakai lagi)


4.8000 h.o tukang kayu Rp 138,000.00 Rp. 662,400.00
0.4800 h.o kepala tukang Rp 143,000.00 Rp. 68,640.00
3.2000 h.o pekerja Rp 118,000.00 Rp. 377,600.00
0.1600 h.o mandor Rp 163,000.00 Rp. 26,080.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 1,134,720.00
9. 1 m2 Membongkar paving block
0.1000 h.o pekerja Rp 118,000.00 Rp. 11,800.00
0.0100 h.o mandor Rp 163,000.00 Rp. 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 13,430.00

10. 1 bh Membongkar dan melepas fender


4.0000 h.o pekerja Rp 118,000.00 Rp. 472,000.00
1.0000 h.o tukang Rp 138,000.00 Rp. 138,000.00
0.4000 h.o mandor Rp 163,000.00 Rp. 65,200.00
1.0000 ls alat bantu Rp 105,000.00 Rp. 105,000.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 675,200.00

11. 1 kg Membongkar rangka baja gudang


0.0080 h.o pekerja Rp 118,000.00 Rp. 944.00
0.0100 h.o tukang besi Rp 138,000.00 Rp. 1,380.00
0.0010 h.o kepala tukang Rp 143,000.00 Rp. 143.00
0.0004 h.o mandor Rp 163,000.00 Rp. 65.20
Jumlah Upah Kerja . . . . . . . . . . Rp. 2,532.20

12. 1 m2 Membongkar Dinding Sekat (Aluminium+Rangka Kayu+Tripleks+Kaca)


0.2500 h.o Pekerja Rp. 118,000.00 Rp. 29,500.00
0.0250 h.o Mandor Rp. 163,000.00 Rp. 4,075.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 33,575.00

13. 1m2 Membongkar perkerasan lama (serifying) tebal 10 cm


0.1000 h.o pekerja Rp 118,000.00 Rp. 11,800.00
0.0060 h.o mandor Rp 163,000.00 Rp. 978.00
1.0000 ls alat bantu Rp 75,000.00 Rp. 75,000.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 87,778.00

J PEKERJAAN KUNCI DAN KACA


1. 1 buah Pasang kunci tanam antik
0.0600 h.o pekerja Rp 118,000.00 Rp 7,080.00
0.6000 h.o tukang kayu Rp 138,000.00 Rp 82,800.00
0.0600 h.o kepala tukang Rp 143,000.00 Rp 8,580.00
0.0030 h.o mandor Rp 163,000.00 Rp 489.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 98,949.00
1.0000 set Kunci tanam antik Rp 250,000.00 Rp 250,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 250,000.00
. . . . . . . . . . Rp. 348,949.00
Overhead + Profit (15%) Rp. 52,342.35
Jumlah Total Rp. 401,291.35

2. 1 buah Pasang kunci tanam biasa


0.0100 h.o pekerja Rp 118,000.00 Rp 1,180.00
0.5000 h.o tukang kayu Rp 138,000.00 Rp 69,000.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.0050 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 72,425.00
1.0000 set Kunci tanam biasa Rp 80,000.00 Rp 80,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 80,000.00
. . . . . . . . . . Rp. 152,425.00
Overhead + Profit (15%) Rp. 22,863.75
Jumlah Total Rp. 175,288.75

3. 1 buah Pasang kunci tanam kamar mandi / kunci silinder


0.0050 h.o pekerja Rp 118,000.00 Rp 590.00
0.5000 h.o tukang kayu Rp 138,000.00 Rp 69,000.00
0.0050 h.o kepala tukang Rp 143,000.00 Rp 715.00
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 70,712.50
1.0000 set Kunci tanam kamar mandi / kunci silinder Rp - Rp -
Jumlah Biaya bahan . . . . . . . . . . Rp. -
. . . . . . . . . . Rp. 70,712.50
Overhead + Profit (15%) Rp. 10,606.88
Jumlah Total Rp. 81,319.38

4. 1 buah Pasang engsel pintu / spring knip


0.0150 h.o pekerja Rp 118,000.00 Rp 1,770.00
0.1500 h.o tukang kayu Rp 138,000.00 Rp 20,700.00
0.0150 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.0008 h.o mandor Rp 163,000.00 Rp 122.25
Jumlah Upah Kerja . . . . . . . . . . Rp. 24,737.25
1.0000 set Engsel pintu / spring knip Rp 35,000.00 Rp 35,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 35,000.00
. . . . . . . . . . Rp. 59,737.25
Overhead + Profit (15%) Rp. 8,960.59
Jumlah Total Rp. 68,697.84
5.
1 buah Pasang engsel jendela kupu-kupu / door stop
0.0100 h.o pekerja Rp 118,000.00 Rp 1,180.00
0.1000 h.o tukang kayu Rp 138,000.00 Rp 13,800.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.0005 h.o mandor Rp 163,000.00 Rp 81.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 16,491.50
1.0000 set Engsel jendela / door stop Rp 25,000.00 Rp 25,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 25,000.00
. . . . . . . . . . Rp. 41,491.50
Overhead + Profit (15%) Rp. 6,223.73
Jumlah Total Rp. 47,715.23
6.
1 buah Pasang engsel angin / kunci selot
0.0200 h.o pekerja Rp 118,000.00 Rp 2,360.00
0.2000 h.o tukang kayu Rp 138,000.00 Rp 27,600.00
0.0200 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.0100 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 34,450.00
1.0000 set Engsel angin / kunci selot Rp 35,000.00 Rp 35,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 35,000.00
. . . . . . . . . . Rp. 69,450.00
Overhead + Profit (15%) Rp. 10,417.50
Jumlah Total Rp. 79,867.50

7. 1 buah Pasang door closer / door holder


0.0500 h.o pekerja Rp 118,000.00 Rp 5,900.00
0.5000 h.o tukang kayu Rp 138,000.00 Rp 69,000.00
0.0500 h.o kepala tukang Rp 143,000.00 Rp 7,150.00
0.0025 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 82,457.50
1.0000 set Door closer / door holder Rp 250,000.00 Rp 250,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 250,000.00
. . . . . . . . . . Rp. 332,457.50
Overhead + Profit (15%) Rp. 49,868.63
Jumlah Total Rp. 382,326.13
9. 1 m2 Pasang kaca tebal 3 - 5 mm
0.0150 h.o pekerja Rp 118,000.00 Rp 1,770.00
0.1500 h.o tukang kaca Rp 138,000.00 Rp 20,700.00
0.0150 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.0008 h.o mandor Rp 163,000.00 Rp 122.25
Jumlah Upah Kerja . . . . . . . . . . Rp. 24,737.25
1.1000 m2 Kaca tebal 3 / 5 mm Rp 150,000.00 Rp 165,000.00
0.0500 kg Sealent Rp 30,000.00 Rp 1,500.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 166,500.00
. . . . . . . . . . Rp. 191,237.25
Overhead + Profit (15%) Rp. 28,685.59
Jumlah Total Rp. 78,554.21

1 bh Pasang handle
0.0500 h.o Pekerja Rp 118,000.00 Rp 5,900.00
0.5000 h.o Tukang kayu Rp 138,000.00 Rp 69,000.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.0025 h.o Mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja ..... . . . . . . . . . Rp. 82,457.50
1.0000 bh Pull handle 450 mm Rp 403,700.00 Rp 403,700.00
1.0000 bh Pull handle 300 mm Rp 286,000.00 Rp 286,000.00
1.0000 set Lever handle Rp 319,000.00 Rp 319,000.00
1.0000 bh Handle tanam Rp 104,500.00 Rp 104,500.00
Jumlah Biaya Pull handle 450 mm ..... . . . . . . . . . Rp. 403,700.00
Jumlah Biaya Pull handle 300 mm ..... . . . . . . . . . Rp. 286,000.00
Jumlah Biaya Bahan Lever handle ..... . . . . . . . . . Rp. 319,000.00
Jumlah Biaya Bahan Handle tanam ..... . . . . . . . . . Rp. 104,500.00
Rp. 1,113,200.00
Jumlah Biaya Pull handle 450 mm ..... . . . . . . . . . Rp. 486,157.50
Jumlah Biaya Pull handle 300 mm ..... . . . . . . . . . Rp. 572,000.00
Jumlah Biaya Bahan Lever handle ..... . . . . . . . . . Rp. 638,000.00
Jumlah Biaya Bahan Handle tanam ..... . . . . . . . . . Rp. 209,000.00

Jumlah Biaya Pull handle 450 mm


Overhead + Profit (15%) Rp. 559,081.13
Overhead
Jumlah Biaya Pull handle 300 mm + Profit (15%) Rp. 657,800.00
Overhead
Jumlah Biaya Bahan Lever handle + Profit (15%) Rp. 733,700.00
Jumlah Biaya Bahan Handle tanamOverhead + Profit (15%) Rp. 240,350.00

1 bh Pasang kunci silinder


0.0050 h.o Pekerja Rp 118,000.00 Rp 590.00
0.5000 h.o Tukang kayu Rp 138,000.00 Rp 69,000.00
0.0050 h.o Kepala tukang Rp 143,000.00 Rp 715.00
0.0003 h.o Mandor Rp 163,000.00 Rp 40.75
Jumlah Upah Kerja ..... . . . . . . . . . Rp. 70,345.75
1.0000 set Cylinder Rp 110,000.00 Rp 110,000.00
Jumlah Biaya Bahan ..... . . . . . . . . . Rp. 110,000.00
..... . . . . . . . . . Rp. 180,345.75
Overhead + Profit (15%) Rp. 27,051.86
Jumlah Total Rp. 207,397.61

1 bh Pasang lockcase
0.0100 h.o Pekerja Rp 118,000.00 Rp 1,180.00
0.5000 h.o Tukang kayu Rp 138,000.00 Rp 69,000.00
0.0100 h.o Kepala tukang Rp 143,000.00 Rp 1,430.00
0.0050 h.o Mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja ..... . . . . . . . . . Rp 72,425.00
1.0000 set Lockcase Rp 253,000.00 Rp 253,000.00
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 253,000.00
..... . . . . . . . . . Rp 325,425.00
Overhead + Profit (15%) Rp. 48,813.75
Jumlah Total Rp. 374,238.75

1 bh Pasang item kunci


0.0150 h.o Pekerja Rp 118,000.00 Rp 1,770.00
0.1500 h.o Tukang kayu Rp 138,000.00 Rp 20,700.00
0.0150 h.o Kepala tukang Rp 143,000.00 Rp 2,145.00
0.00075 h.o Mandor Rp 163,000.00 Rp 122.25
Jumlah Upah Kerja ..... . . . . . . . . . Rp. 24,737.25
1.0000 bh Flush bolt Rp 198,000.00 Rp 198,000.00
1.0000 bh Grendel gudang Rp 159,500.00 Rp 159,500.00
1.0000 bh Escutcheon Rp 67,100.00 Rp 67,100.00
Jumlah Biaya Bahan Flush bolt ..... . . . . . . . . . 198,000.00
Jumlah Biaya Bahan Grendel gudang ..... . . . . . . . . . 159,500.00
Jumlah Biaya Bahan Escutcheon ..... . . . . . . . . . 67,100.00

Jumlah Total Flush bolt ..... . . . . . . . . . 222,737.25


Jumlah Total Grendel gudang ..... . . . . . . . . . 184,237.25
Jumlah Total Escutcheon ..... . . . . . . . . . 91,837.25

Overhead + Profit (15%)


Jumlah Total Flush bolt 256,147.84
Jumlah Total Grendel gudangOverhead + Profit (15%) 211,872.84
Jumlah Total EscutcheonOverhead + Profit (15%) 105,612.84

1 bh Pek. Pintu P1
5.0800 m' Kusen Aluminium 4" Rp 43,645.00 Rp 221,716.60
1.6480 m2 Daun pintu plywood Rp 408,135.00 Rp 672,606.48
1.4428 m2 HPL Rp 47,336.50 Rp 68,297.10
0.2052 m2 Kaca polos 5 mm Rp 24,737.25 Rp 5,076.08
4.0000 bh Engsel panel stailessteel Rp 24,737.25 Rp 98,949.00
1.0000 bh Lever handle Rp 82,457.50 Rp 82,457.50
1.0000 set Cylinder Rp 70,345.75 Rp 70,345.75
1.0000 set Lockcase Rp 72,425.00 Rp 72,425.00
Jumlah Upah Kerja …………………….. 1,291,873.52
5.0800 m' Kusen Aluminium 4" Rp 156,000.00 Rp 792,480.00
1.6480 m2 Daun pintu plywood Rp 454,600.00 Rp 749,180.80
1.4428 m2 HPL Rp 171,800.00 Rp 247,873.04
0.2052 m2 Kaca polos 5 mm Rp 166,500.00 Rp 34,165.80
4.0000 bh Engsel panel stailessteel Rp 35,000.00 Rp 140,000.00
1.0000 bh Lever handle Rp 319,000.00 Rp 319,000.00
1.0000 set Cylinder Rp 110,000.00 Rp 110,000.00
1.0000 set Lockcase Rp 253,000.00 Rp 253,000.00
Jumlah Biaya Bahan …………………. 2,645,699.64
Jumlah Total ………………….. 3,937,573.16
Overhead + Profit (15%) Rp. 590,635.97
Jumlah Total Rp. 4,528,209.13

1 bh Pek. Pintu P2
5.7000 m' Kusen Aluminium 4" Rp 43,645.00 Rp 248,776.50
3.0900 m2 Daun pintu plywood Rp 408,135.00 Rp 1,261,137.15
7.3000 m' Aluminium 20x40 mm Rp 97,539.00 Rp 712,034.70
5.4000 m' Hollow 20x20x1.2 mm Rp 4,568.85 Rp 24,671.79
3.4000 m' Besi siku 20x20x3 mm Rp 11,965.20 Rp 40,681.68
2.9100 m2 HPL Rp 47,336.50 Rp 137,749.22
0.1800 m2 Kaca polos 5 mm Rp 24,737.25 Rp 4,452.71
4.0000 bh Engsel panel stailessteel Rp 24,737.25 Rp 98,949.00
2.0000 bh Full Handle Rp 82,457.50 Rp 164,915.00
1.0000 set Cylinder Rp 70,345.75 Rp 70,345.75
1.0000 bh Flush bolt Rp 24,737.25 Rp 24,737.25
1.0000 set Lockcase Rp 72,425.00 Rp 72,425.00
Jumlah Upah Kerja …………………….. 2,860,875.74
5.7000 m' Kusen Aluminium 4" Rp 156,000.00 Rp 889,200.00
3.0900 m2 Daun pintu plywood Rp 454,600.00 Rp 1,404,714.00
7.3000 m' Aluminium 20x40 mm Rp 140,000.00 Rp 1,022,000.00
5.4000 m' Hollow 20x20x1.2 mm Rp 19,360.03 Rp 104,544.18
3.4000 m' Besi siku 20x20x3 mm Rp 19,750.00 Rp 67,150.00
2.9100 m2 HPL Rp 171,800.00 Rp 499,938.00
0.1800 m2 Kaca polos 5 mm Rp 166,500.00 Rp 29,970.00
4.0000 bh Engsel panel stailessteel Rp 35,000.00 Rp 140,000.00
2.0000 bh Full Handle Rp 286,000.00 Rp 572,000.00
1.0000 set Cylinder Rp 110,000.00 Rp 110,000.00
1.0000 bh Flush bolt Rp 198,000.00 Rp 198,000.00
1.0000 set Lockcase Rp 253,000.00 Rp 253,000.00
Jumlah Biaya Bahan …………………. 5,290,516.18
Jumlah Total ………………….. 8,151,391.92
Overhead + Profit (15%) Rp. 1,222,708.79
Jumlah Total Rp. 9,374,100.71

1 bh Pek. Pintu P3
5.0800 m' Kusen Aluminium 4" Rp 43,645.00 Rp 221,716.60
2.2660 m2 Daun pintu plywood Rp 408,135.00 Rp 924,833.91
2.0608 m2 HPL Rp 47,336.50 Rp 97,551.06
0.2052 m2 Kaca polos 5 mm Rp 24,737.25 Rp 5,076.08
4.0000 bh Engsel panel stailessteel Rp 24,737.25 Rp 98,949.00
2.0000 bh Lever handle Rp 82,457.50 Rp 164,915.00
1.0000 set Cylinder Rp 70,345.75 Rp 70,345.75
1.0000 bh Flush bolt Rp 24,737.25 Rp 24,737.25
1.0000 set Door Closer Rp 82,457.50 Rp 82,457.50
Jumlah Upah Kerja …………………….. 1,690,582.15
5.0800 m' Kusen Aluminium 4" Rp 156,000.00 Rp 792,480.00
2.2660 m2 Daun pintu plywood Rp 454,600.00 Rp 1,030,123.60
2.0608 m2 HPL Rp 171,800.00 Rp 354,045.44
0.2052 m2 Kaca polos 5 mm Rp 24,737.25 Rp 5,076.08
4.0000 bh Engsel panel stailessteel Rp 35,000.00 Rp 140,000.00
2.0000 bh Lever handle Rp 319,000.00 Rp 638,000.00
1.0000 set Cylinder Rp 110,000.00 Rp 110,000.00
1.0000 bh Flush bolt Rp 198,000.00 Rp 198,000.00
1.0000 set Door Closer Rp 250,000.00 Rp 250,000.00
Jumlah Biaya Bahan …………………. 3,517,725.12
Jumlah Total ………………….. 5,208,307.28
Overhead + Profit (15%) Rp. 781,246.09
Jumlah Total Rp. 5,989,553.37

1 bh Pek. Pintu P5
9.2500 m2 Folding door Rp 284,662.60 Rp 2,633,129.05
Jumlah Upah Kerja …………………….. 2,633,129.05
9.2500 m2 Folding door Rp 501,700.00 Rp 4,640,725.00
Jumlah Biaya Bahan …………………. 4,640,725.00
Jumlah Total ………………….. 7,273,854.05
Overhead + Profit (15%) Rp. 1,091,078.11
Jumlah Total Rp. 8,364,932.16

1 bh Pek. Pintu P6
6.6000 m2 Folding door Rp 284,662.60 Rp 1,878,773.16
Jumlah Upah Kerja …………………….. 1,878,773.16
6.6000 m2 Folding door Rp 501,700.00 Rp 3,311,220.00
Jumlah Biaya Bahan …………………. 3,311,220.00
Jumlah Total ………………….. 5,189,993.16
Overhead + Profit (15%) Rp. 778,498.97
Jumlah Total Rp. 5,968,492.13

1 bh Pek. Jendela
17.0000 m' Kusen Aluminium 4" Rp 43,645.00 Rp 741,965.00
12.8000 m' Aluminium 20x40 mm Rp 97,539.00 Rp 1,248,499.20
1.6536 m2 Kaca polos 5 mm Rp 24,737.25 Rp 40,905.52
8.0000 bh Engsel panel stailessteel Rp 35,000.00 Rp 280,000.00
4.0000 bh Grendel jendela Rp 24,737.25 Rp 98,949.00
Jumlah Upah Kerja …………………….. 2,410,318.72
17.0000 m' Kusen Aluminium 4" Rp 156,000.00 Rp 2,652,000.00
12.8000 m' Aluminium 20x40 mm Rp 140,000.00 Rp 1,792,000.00
1.6536 m2 Kaca polos 5 mm Rp 24,737.25 Rp 40,905.52
8.0000 bh Engsel panel stailessteel Rp 35,000.00 Rp 280,000.00
4.0000 bh Grendel jendela Rp 159,500.00 Rp 638,000.00
Jumlah Biaya Bahan …………………. 5,402,905.52
Jumlah Total ………………….. 7,813,224.23
Overhead + Profit (15%) Rp. 1,171,983.63
Jumlah Total Rp. 8,985,207.87

K PEKERJAAN PASANG BESI DAN ALUMINIUM

1. 1 Kg Pasang rangka baja profil WF, C, I, L, O


0.0600 h.o pekerja Rp 118,000.00 Rp 7,080.00
0.0060 h.o tukang besi Rp 138,000.00 Rp 828.00
0.0060 h.o kepala tukang Rp 143,000.00 Rp 858.00
0.0003 h.o mandor Rp 163,000.00 Rp 48.90
Jumlah Upah Kerja . . . . . . . . . . Rp. 8,814.90

1.1000 Kg Baja profil WF, C, I, L, O Rp - Rp -


0.0800 Kg Meni Besi Rp 35,000.00 Rp 2,800.00
Jumlah Biaya bahan . . . . . . . . . . Rp. -
Jumlah Total . . . . . . . . . . Rp. 8,814.90

1 m' Pasang Profil Baja IWF 400x200x8x13 mm


1.7154 h.o Pekerja Rp 118,000.00 Rp 202,415.08
0.1715 h.o Tukang Besi / Las Rp 138,000.00 Rp 23,672.27
0.0286 h.o Kepala tukang Rp 143,000.00 Rp 4,088.33
0.0057 h.o Mandor Rp 163,000.00 Rp 932.02
Jumlah Upah Kerja ..... . . . . . . . . . Rp 231,107.70
0.0833 Btg IWF 400x200x8x13 mm Rp 13,860,000.00 Rp 1,155,000.00
1.0000 ls Material las (2% Bp) Rp 277,200.00 Rp 277,200.00
0.5440 kg Meni besi Rp 35,000.00 Rp 19,040.00
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 1,451,240.00
Jumlah Total ..... . . . . . . . . . Rp 1,682,347.70
Overhead + Profit (15%) Rp. 252,352.15
Jumlah Total Rp. 1,934,699.85

1 m' Pasang Profil Baja IWF 200x100x5.5x8 mm


1.7154 h.o Pekerja Rp 118,000.00 Rp 202,415.08
0.1715 h.o Tukang Besi / Las Rp 138,000.00 Rp 23,672.27
0.0286 h.o Kepala tukang Rp 143,000.00 Rp 4,088.33
0.0057 h.o Mandor Rp 163,000.00 Rp 932.02
Jumlah Upah Kerja ..... . . . . . . . . . Rp 231,107.70
0.0833 Btg IWF 200x100x5.5x8 mm Rp 2,604,000.00 Rp 217,000.00
1.0000 ls Material las (2% Bp) Rp 52,080.00 Rp 52,080.00
0.5440 kg Meni besi Rp 35,000.00 Rp 19,040.00
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 288,120.00
Jumlah Total ..... . . . . . . . . . Rp 519,227.70
Overhead + Profit (15%) Rp. 77,884.15
Jumlah Total Rp. 597,111.85

1 m' Pasang Pipa baja 6"


0.9642 h.o Pekerja Rp 118,000.00 Rp 113,775.60
0.0964 h.o Tukang Besi / Las Rp 138,000.00 Rp 13,305.96
0.0161 h.o Kepala tukang Rp 143,000.00 Rp 2,298.01
0.0032 h.o Mandor Rp 163,000.00 Rp 523.88
Jumlah Upah Kerja ..... . . . . . . . . . Rp 129,903.45
0.1667 Btg Pipa baja 6", 6.02 mm Rp 1,860,000.00 Rp 310,000.00
1.0000 ls Material las (2% Bp) Rp 37,200.00 Rp 37,200.00
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 347,200.00
Jumlah Total ..... . . . . . . . . . Rp 477,103.45
Overhead + Profit (15%) Rp. 71,565.52
Jumlah Total Rp. 548,668.97

1 m' Pek. Pipa baja 3", 5.49 mm


0.6774 h.o Pekerja Rp 118,000.00 79,933.20
0.0677 h.o Tukang Besi / Las Rp 138,000.00 9,348.12
0.0113 h.o Kepala tukang Rp 143,000.00 1,614.47
0.0023 h.o Mandor Rp 163,000.00 368.05
Jumlah Upah Kerja ..... . . . . . . . . . 91,263.84
0.1667 Btg Pipa baja 2", 3.91 mm Rp 303,000.00 50,500.00
1.0000 ls Material las (2% Bp) Rp 6,060.00 6,060.00
Jumlah Biaya Bahan ..... . . . . . . . . . 56,560.00
Jumlah Total ..... . . . . . . . . . 147,823.84

1 m' Pasang Pipa baja 2", 3.91 mm


0.3264 h.o Pekerja Rp 118,000.00 38,515.20
0.0326 h.o Tukang Besi / Las Rp 138,000.00 4,498.80
0.0054 h.o Kepala tukang Rp 143,000.00 772.20
0.0011 h.o Mandor Rp 163,000.00 179.30
Jumlah Upah Kerja ..... . . . . . . . . . 43,965.50
0.1667 Btg Pipa baja 2", 3.91 mm Rp - 0.00
1.0000 ls Material las (2% Bp) Rp 14,260.82 14,260.82
Jumlah Biaya Bahan ..... . . . . . . . . . 14,260.82
Jumlah Total ..... . . . . . . . . . 58,226.32

1 m' Pek. CNP 150x50x20x2.3 mm


0.3300 h.o Pekerja Rp 118,000.00 Rp 38,940.00
0.0330 h.o Tukang Besi / Las Rp 138,000.00 Rp 4,554.00
0.0055 h.o Kepala tukang Rp 143,000.00 Rp 786.50
0.0011 h.o Mandor Rp 163,000.00 Rp 179.30
Jumlah Upah Kerja ..... . . . . . . . . . Rp 44,459.80
1.0000 m' CNP 150x50x20x2.3 mm Rp 59,666.67 Rp 59,666.67
1.0000 ls Material bantu (2%) Rp 1,193.33 Rp 1,193.33
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 60,860.00
Jumlah Total ..... . . . . . . . . . Rp 105,319.80
Overhead + Profit (15%) Rp. 15,797.97
Jumlah Total Rp. 121,117.77

1 kg Pasang plat baja


0.0600 h.o Pekerja Rp 118,000.00 Rp 7,080.00
0.0060 h.o Tukang Besi / Las Rp 138,000.00 Rp 828.00
0.0010 h.o Kepala tukang Rp 143,000.00 Rp 143.00
0.0002 h.o Mandor Rp 163,000.00 Rp 32.60
Jumlah Upah Kerja ..... . . . . . . . . . Rp 8,083.60
1.0500 kg Baja Plat Rp 10,881.10 Rp 11,425.16
1.0000 ls Material las 5% Bp) Rp 544.06 Rp 544.06
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 11,969.21
Jumlah Total ..... . . . . . . . . . Rp 20,052.81
Overhead + Profit (15%) Rp. 3,007.92
Jumlah Total Rp. 23,060.74

1 kg Pasang baut angker baja


0.0200 h.o Pekerja Rp 118,000.00 Rp 2,360.00
0.0300 h.o Tukang besi Rp 138,000.00 Rp 4,140.00
0.0030 h.o Kepala tukang Rp 143,000.00 Rp 429.00
0.0002 h.o Mandor Rp 163,000.00 Rp 32.60
Jumlah Upah Kerja ..... . . . . . . . . . Rp 6,961.60
1.0000 kg Angker bar Rp 25,600.00 Rp 25,600.00
1.0400 kg Baut segala ukuran Rp 21,200.00 Rp 22,048.00
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 47,648.00
Jumlah Total ..... . . . . . . . . . Rp 54,609.60
Overhead + Profit (15%) Rp. 8,191.44
Jumlah Total Rp. 62,801.04

1 cm Pengelasan
0.0032 h.o Pekerja Rp 118,000.00 Rp 374.65
0.0016 h.o Tukang las Rp 138,000.00 Rp 219.01
0.0002 h.o Kepala tukang las Rp 143,000.00 Rp 22.69
Jumlah Upah Kerja ..... . . . . . . . . . Rp 616.35
0.0080 kg Kawat las Rp 135,000.00 Rp 1,080.00
0.0016 h.a Mesin las listrik komplit termasuk spare part Rp 1,000,000.00 Rp 1,587.00
Jumlah Biaya Bahan & Peralatan ..... . . . . . . . . . Rp 2,667.00
Jumlah Total ..... . . . . . . . . . Rp 3,283.35
Overhead + Profit (15%) Rp. 492.50
Jumlah Total Rp. 3,775.85

1 bh baut HTB M16


0.0060 h.o Pekerja Rp 118,000.00 Rp 708.00
Jumlah Upah Kerja ..... . . . . . . . . . Rp 708.00
1.0000 bh Baut dia.16 mm Rp 23,200.00 Rp 23,200.00
Jumlah Biaya Bahan & Peralatan ..... . . . . . . . . . Rp 23,200.00
Jumlah Total ..... . . . . . . . . . Rp 23,908.00
Overhead + Profit (15%) Rp. 3,586.20
Jumlah Total Rp. 27,494.20

1 bh baut M8
0.0060 h.o Pekerja Rp 118,000.00 Rp 708.00
Jumlah Upah Kerja ..... . . . . . . . . . Rp 708.00
1.0000 bh Baut dia.8 mm Rp 5,700.00 Rp 5,700.00
Jumlah Biaya Bahan & Peralatan ..... . . . . . . . . . Rp 5,700.00
Jumlah Total ..... . . . . . . . . . Rp 6,408.00
Overhead + Profit (15%) Rp. 961.20
Jumlah Total Rp. 7,369.20

1 bh Pekerjaan jarum keras


0.0060 h.o Pekerja Rp 118,000.00 Rp 708.00
Jumlah Upah Kerja ..... . . . . . . . . . Rp 708.00
1.0000 bh Jarum Keras M16 Rp 41,250.00 Rp 41,250.00
1.0000 ls Acc Rp 25,000.00 Rp 25,000.00
Jumlah Biaya Bahan & Peralatan ..... . . . . . . . . . Rp 66,250.00
Jumlah Total ..... . . . . . . . . . Rp 66,958.00
Overhead + Profit (15%) Rp. 10,043.70
Jumlah Total Rp. 77,001.70

2. 1 m2 Pasang pintu besi/baja


0.6500 h.o pekerja Rp 118,000.00 Rp 76,700.00
0.6500 h.o tukang besi Rp 138,000.00 Rp 89,700.00
0.0650 h.o kepala tukang Rp 143,000.00 Rp 9,295.00
0.0320 h.o mandor Rp 163,000.00 Rp 5,216.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 180,911.00

1.0000 m2 Pintu besi baja Rp 550,000.00 Rp 550,000.00


Jumlah Biaya bahan . . . . . . . . . . Rp. 550,000.00
Jumlah Total . . . . . . . . . . Rp. 730,911.00

3. 1 m2 Pasang jendela besi


1.0500 h.o pekerja Rp 118,000.00 Rp 123,900.00
1.0500 h.o tukang besi Rp 138,000.00 Rp 144,900.00
0.1050 h.o kepala tukang Rp 143,000.00 Rp 15,015.00
0.0053 h.o mandor Rp 163,000.00 Rp 855.75
Jumlah Upah Kerja . . . . . . . . . . Rp. 284,670.75

1.0000 m2 Jendela besi Rp 1,650,000.00 Rp 1,650,000.00


Jumlah Biaya bahan . . . . . . . . . . Rp. 1,650,000.00

Jumlah Total . . . . . . . . . . Rp. 1,934,670.75


4. 1 m2 Pasang pintu gulung besi
1.2000 h.o pekerja Rp 118,000.00 Rp 141,600.00
1.2000 h.o tukang besi Rp 138,000.00 Rp 165,600.00
0.1200 h.o kepala tukang Rp 143,000.00 Rp 17,160.00
0.0060 h.o mandor Rp 163,000.00 Rp 978.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 325,338.00
1.0000 m2 Pintu gulung besi Rp 550,000.00 Rp 550,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 550,000.00

Jumlah Total . . . . . . . . . . Rp. 875,338.00

5. 1 m2 Pasang pintu lipat besi / pintu aluminium


1.0500 h.o pekerja Rp 118,000.00 Rp 123,900.00
1.0500 h.o tukang besi Rp 138,000.00 Rp 144,900.00
0.1050 h.o kepala tukang Rp 143,000.00 Rp 15,015.00
0.0052 h.o mandor Rp 163,000.00 Rp 847.60
Jumlah Upah Kerja . . . . . . . . . . Rp. 284,662.60
1.0000 m2 Pintu lipat besi / pintu aluminium Rp 250,000.00 Rp 250,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 250,000.00

Jumlah Total . . . . . . . . . . Rp. 534,662.60

6. 1 m2 Pasang rolling door


1.0500 h.o pekerja Rp 118,000.00 Rp 123,900.00
1.5000 h.o tukang besi Rp 138,000.00 Rp 207,000.00
0.1050 h.o kepala tukang Rp 143,000.00 Rp 15,015.00
0.0052 h.o mandor Rp 163,000.00 Rp 847.60
Jumlah Upah Kerja . . . . . . . . . . Rp. 346,762.60
1.0000 m2 Roll door Rp 250,000.00 Rp 250,000.00

Jumlah Total . . . . . . . . . . Rp. #REF!

1 m2 Pasang folding door


1.0500 h.o pekerja Rp 118,000.00 Rp 123,900.00
1.0500 h.o tukang besi Rp 138,000.00 Rp 144,900.00
0.1050 h.o kepala tukang Rp 143,000.00 Rp 15,015.00
0.0052 h.o mandor Rp 163,000.00 Rp 847.60
Jumlah Upah Kerja . . . . . . . . . . Rp. 284,662.60
1.0000 m2 Folding door Rp 501,700.00 Rp 501,700.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 501,700.00
Jumlah Total . . . . . . . . . . Rp. 786,362.60

7. 1 m2 Pasang horizontal/vertical blinds


0.3500 h.o pekerja Rp 118,000.00 Rp 41,300.00
0.3500 h.o tukang kayu Rp 138,000.00 Rp 48,300.00
0.0350 h.o kepala tukang Rp 143,000.00 Rp 5,005.00
0.0018 h.o mandor Rp 163,000.00 Rp 285.25
Jumlah Upah Kerja . . . . . . . . . . Rp. 94,890.25
1.0000 m2 Horizontal/vertical blinds Rp 800,000.00 Rp 800,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 800,000.00

Jumlah Total . . . . . . . . . . Rp. 894,890.25


8. 1 m2 Pasang jendela nako dan tralis
0.2000 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.2000 h.o tukang kayu Rp 138,000.00 Rp 27,600.00
0.0200 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.0010 h.o mandor Rp 163,000.00 Rp 163.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 54,223.00

1.1000 m2 Jendela nako Rp 104,000.00 Rp 114,400.00


0.0200 kg Paku biasa 1/2" - 1" atau sekrup Rp 27,000.00 Rp 540.00
0.0250 m2 Besi strip Rp 45,000.00 Rp 1,125.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 116,065.00

Jumlah Total . . . . . . . . . . Rp. 170,288.00

9. 1 m2 Pasang terali besi


1.2000 h.o pekerja Rp 118,000.00 Rp 141,600.00
1.2000 h.o tukang besi Rp 138,000.00 Rp 165,600.00
0.0120 h.o kepala tukang Rp 143,000.00 Rp 1,716.00
0.0006 h.o mandor Rp 163,000.00 Rp 97.80
Jumlah Upah Kerja . . . . . . . . . . Rp. 309,013.80

11.5000 m' Besi strip 2 x 3 Rp 22,000.00 Rp 253,000.00


Jumlah Biaya bahan . . . . . . . . . . Rp. 253,000.00

Jumlah Total . . . . . . . . . . Rp. 562,013.80

10. 1 m2 Pasang kawat (harmonika, nyamuk, kassa, burung)


0.1000 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.1000 h.o tukang kayu Rp 138,000.00 Rp 13,800.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.0005 h.o mandor Rp 163,000.00 Rp 81.50
Jumlah Upah Kerja . . . . . . . . . . Rp. 27,111.50

1.1000 m2 Kawat (harmonika,nyamuk,kassa,burung) Rp 35,000.00 Rp 38,500.00


0.0200 kg Paku biasa 1/2" - 1" Rp 27,000.00 Rp 540.00
0.0018 m3 Papan kayu kelas I/II Rp 15,000,000.00 Rp 27,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 66,040.00

Jumlah Total . . . . . . . . . . Rp. 93,151.50

11. 1 bh Pasang Bollard 25 - 50 ton


3.0000 h.o pekerja Rp 118,000.00 Rp 354,000.00
0.5000 h.o tukang besi Rp 138,000.00 Rp 69,000.00
0.2000 h.o mandor Rp 163,000.00 Rp 32,600.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 455,600.00

1.0000 bh Bollard 25 - 50 ton Rp 35,000,000.00 Rp 35,000,000.00


Jumlah Biaya bahan . . . . . . . . . . Rp. 35,000,000.00

Jumlah Total . . . . . . . . . . Rp. 35,455,600.00

12. 1 bh Pasang Cleat


0.4000 h.o pekerja Rp 118,000.00 Rp 47,200.00
0.0400 h.o mandor Rp 163,000.00 Rp 6,520.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 53,720.00

1.0000 bh Cleat Rp 17,500.00 Rp 17,500.00


Jumlah Biaya bahan . . . . . . . . . . Rp. 17,500.00

Jumlah Total . . . . . . . . . . Rp. 71,220.00

13. 1 m' Pasang List Dilatasi Besi Siku


0.4000 h.o pekerja Rp 118,000.00 Rp 47,200.00
0.0400 h.o mandor Rp 163,000.00 Rp 6,520.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 53,720.00

1.0000 m' Besi siku Rp 50,000.00 Rp 50,000.00


0.3400 kg Besi anchor Rp 17,500.00 Rp 5,950.00
7.0000 cm Pengelasan Rp 3,900.83 Rp 27,305.83
0.2000 m2 Pelapisan epoxy/tar Rp 216,275.00 Rp 43,255.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 126,510.83

Jumlah Total . . . . . . . . . . Rp. 180,230.83

14. 1 m' Pasang Rangka Aluminium


0.0775 h.o pekerja Rp 118,000.00 Rp 9,145.00
0.2500 h.o tukang Aluminium Rp 138,000.00 Rp 34,500.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 43,645.00
1.1000 m' Profil Aluminium Rp 135,000.00 Rp 148,500.00
10.0000 bh Mur Rp 750.00 Rp 7,500.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 156,000.00
Jumlah Total . . . . . . . . . . Rp. 199,645.00
Overhead + Profit (15%) Rp. 29,946.75
Jumlah Total Rp. 229,591.75

15. 1 m2 Pasang Rangka Hollow 1 x 2


0.8500 h.o pekerja Rp 118,000.00 Rp 100,300.00
0.4000 h.o tukang aluminium Rp 138,000.00 Rp 55,200.00
0.0040 h.o kepala tukang Rp 143,000.00 Rp 572.00
0.0040 h.o mandor Rp 163,000.00 Rp 652.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 156,724.00

1.1000 m2 Hollow 1 x 2 Rp - Rp -
10.0000 bh Skrup Rp 1,000.00 Rp 10,000.00
2.0000 bh Spikot Rp 1,000.00 Rp 2,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 12,000.00
Jumlah Total . . . . . . . . . . Rp. 168,724.00

1 m2 Pasang Rangka Hollow 1 x 2


0.8500 h.o pekerja Rp 118,000.00 Rp 100,300.00
0.4000 h.o tukang aluminium Rp 138,000.00 Rp 55,200.00
0.0040 h.o kepala tukang Rp 143,000.00 Rp 572.00
0.0040 h.o mandor Rp 163,000.00 Rp 652.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 156,724.00
1.1000 m2 Hollow 1 x 2 Rp - Rp -
10.0000 bh Skrup Rp 1,000.00 Rp 10,000.00
2.0000 bh Spikot Rp 1,000.00 Rp 2,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 12,000.00

Jumlah Total . . . . . . . . . . Rp. 168,724.00

1 m2 Pasang Rangka Hollow 1 x 40.20.3mm


0.3500 h.o pekerja Rp 118,000.00 Rp 41,300.00
0.3500 h.o tukang aluminium Rp 138,000.00 Rp 48,300.00
0.0350 h.o kepala tukang Rp 143,000.00 Rp 5,005.00
0.0180 h.o mandor Rp 163,000.00 Rp 2,934.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 97,539.00
4.0000 m Hollow 40.20.3 mm Rp 28,000.00 Rp 112,000.00
1.0000 ls Aksesories Rp 28,000.00 Rp 28,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 140,000.00
. . . . . . . . . . Rp. 237,539.00
Overhead + Profit (15%) Rp. 35,630.85
Jumlah Total Rp. 273,169.85

1 m' Pasang hollow 40x40x0.8 mm


0.0603 h.o Pekerja Rp 118,000.00 Rp 7,113.98
0.0060 h.o Tukang Besi / Las Rp 138,000.00 Rp 831.97
0.0010 h.o Kepala tukang Rp 143,000.00 Rp 143.69
0.0002 h.o Mandor Rp 163,000.00 Rp 32.76
Jumlah Upah Kerja ..... . . . . . . . . . Rp. 8,122.40
0.1667 Btg Hollow 40x40x0.8 mm Rp 135,000.00 22,500.00
1.0000 ls Material las (2% Bp) Rp 2,700.00 Rp 2,700.00
0.0402 kg Meni besi Rp 35,000.00 Rp 1,406.72
Jumlah Biaya Bahan ..... . . . . . . . . . Rp. 26,606.72
Jumlah Total ..... . . . . . . . . . 34,729.12
Overhead + Profit (15%) Rp. 5,209.37
Jumlah Total Rp. 39,938.49

1 m' Pasang hollow 20x40x0.6 mm


0.0339 h.o Pekerja Rp 118,000.00 4,001.62
0.0034 h.o Tukang Besi / Las Rp 138,000.00 Rp 467.99
0.0006 h.o Kepala tukang Rp 143,000.00 Rp 80.82
0.0001 h.o Mandor Rp 163,000.00 Rp 18.43
Jumlah Upah Kerja ..... . . . . . . . . . Rp 4,568.85
0.1667 Btg 20x40x0.6 mm Rp 95,000.00 Rp 15,833.33
1.0000 ls Material las (2% Bp) Rp 2,700.00 Rp 2,700.00
0.0236 kg Meni besi Rp 35,000.00 Rp 826.70
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 19,360.03
..... . . . . . . . . . Rp. 23,928.88
Overhead + Profit (15%) Rp. 3,589.33
Jumlah Total Rp. 27,518.22

16. 1 m2 Pasang Pintu Dorong Kaca


0.2500 h.o pekerja Rp 118,000.00 Rp 29,500.00
0.3750 h.o tukang aluminium Rp 138,000.00 Rp 51,750.00
0.0375 h.o kepala tukang Rp 143,000.00 Rp 5,362.50
0.0200 h.o mandor Rp 163,000.00 Rp 3,260.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 89,872.50

1.1000 m2 Kaca tebal …. mm Rp 150,000.00 Rp 165,000.00


4.0000 m' Karet list Rp 77,000.00 Rp 308,000.00
0.0500 kg Lem kaca Rp 28,000.00 Rp 1,400.00
3.0000 m' Profil Aluminium Rp 135,000.00 Rp 405,000.00
6.0000 bh Mur Rp 750.00 Rp 4,500.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 883,900.00
Jumlah Total . . . . . . . . . . Rp. 973,772.50
17. 1 buah Pasang rel pintu dorong
0.0600 h.o pekerja Rp 118,000.00 Rp 7,080.00
0.6000 h.o tukang besi Rp 138,000.00 Rp 82,800.00
0.0600 h.o kepala tukang Rp 143,000.00 Rp 8,580.00
0.0030 h.o mandor Rp 163,000.00 Rp 489.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 98,949.00

1.0000 set rel pintu dorong Rp 1,000,000.00 Rp 1,000,000.00


Jumlah Biaya bahan . . . . . . . . . . Rp. 1,000,000.00

Jumlah Total . . . . . . . . . . Rp. 1,098,949.00

18 1 m' Pasang talang datar seng BJLS


0.1500 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.4000 h.o tukang kayu Rp 138,000.00 Rp. 55,200.00
0.0250 h.o kepala tukang Rp 143,000.00 Rp. 3,575.00
0.0013 h.o mandor Rp 163,000.00 Rp. 203.75
Jumlah Upah Kerja . . . . . . . . . . Rp 76,678.75

0.5000 lbr Seng pelat 3' x 6' BJLS 28 Rp. 58,000.00 Rp. 29,000.00
0.0150 kg Paku biasa 1/2" - 1" Rp. 27,000.00 Rp. 405.00
0.0096 m3 Papan kayu Rp. 3,750,000.00 Rp. 36,000.00
0.2500 kg Besi strip Rp. 45,000.00 Rp. 11,250.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 40,655.00
Jumlah Total . . . . . . . . . . Rp. 117,333.75
Overhead + Profit (15%) . . . . . . . . . Rp 17,600.06
Jumlah Total . . . . . . . . . Rp 134,933.81

19. 1 m' Pasang talang miring seng BJLS


0.1500 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.4000 h.o tukang kayu Rp 138,000.00 Rp. 55,200.00
0.0250 h.o kepala tukang Rp 143,000.00 Rp. 3,575.00
0.0013 h.o mandor Rp 163,000.00 Rp. 203.75
Jumlah Upah Kerja . . . . . . . . . . Rp 76,678.75

0.5000 lbr Seng pelat 3' x 6' BJLS 28 Rp. 58,000.00 Rp. 29,000.00
0.0150 kg Paku biasa 1/2" - 1" Rp. 27,000.00 Rp. 405.00
0.0190 m3 Papan kayu Rp. 3,750,000.00 Rp. 71,250.00
0.3000 kg Besi strip Rp. 45,000.00 Rp. 13,500.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 114,155.00

Jumlah Total . . . . . . . . . . Rp. 190,833.75

20. 1 m' Pasang talang 1/2 lingkaran D-10cm, seng BJLS


0.1500 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.2500 h.o tukang kayu Rp 138,000.00 Rp. 34,500.00
0.0250 h.o kepala tukang Rp 143,000.00 Rp. 3,575.00
0.0013 h.o mandor Rp 163,000.00 Rp. 203.75
Jumlah Upah Kerja . . . . . . . . . . Rp 55,978.75

0.3000 lbr Seng pelat 3' x 6' BJLS 28 Rp. 58,000.00 Rp. 17,400.00
0.1000 kg Paku biasa 1/2" - 1" Rp. 27,000.00 Rp. 2,700.00
0.0190 m3 Papan kayu Rp. 3,750,000.00 Rp. 71,250.00
0.5000 kg Besi strip Rp. 45,000.00 Rp. 22,500.00
Jumlah Biaya Bahan . . . . . . . . . . Rp 113,850.00

Jumlah Total . . . . . . . . . . Rp. 169,828.75

1 m² Pasang aluminium foil/sisalition


0.150 h.o Pekerja Rp 118,000.00 Rp 17,700.00
0.050 h.o Tukang Rp 138,000.00 Rp 6,900.00
0.005 h.o Kepala Tukang Rp 143,000.00 Rp 715.00
0.008 h.o Mandor Rp 163,000.00 Rp 1,304.00
Jumlah Upah Kerja ..... . . . . . . . . . Rp 26,619.00
1.0500 m2 aluminium foil Rp 9,300.00 Rp 9,765.00
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 9,765.00
Jumlah Upah & Bahan ..... . . . . . . . . . Rp 36,384.00
Overhead + Profit (15%) . . . . . . . . . Rp 5,457.60
Jumlah Total . . . . . . . . . Rp 41,841.60

1 m' Pasang profil aluminium siku 20x20x3 mm


0.043 h.o Pekerja Rp 118,000.00 Rp 5,074.00
0.0430 h.o Tukang kayu Rp 138,000.00 Rp 5,934.00
0.0043 h.o Kepala tukang Rp 143,000.00 Rp 614.90
0.0021 h.o Mandor Rp 163,000.00 Rp 342.30
Jumlah Upah Kerja ..... . . . . . . . . . Rp 11,965.20
1.0500 m' Aluminium siku 20x20x3 mm Rp 11,666.67 Rp 12,250.00
10.0000 bh Mur Rp 750.00 Rp 7,500.00
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 19,750.00
..... . . . . . . . . . Rp 31,715.20
Overhead + Profit (15%) Rp. 4,757.28
Jumlah Total Rp. 36,472.48

1 m2 Pasang Alucopan 0.3 (4) mm


1.5000 h.o Pekerja Rp 118,000.00 Rp 177,000.00
0.7500 h.o Tukang aluminium Rp 138,000.00 Rp 103,500.00
0.0750 h.o Kepala tukang Rp 143,000.00 Rp 10,725.00
0.0075 h.o Mandor Rp 163,000.00 Rp 1,222.50
Jumlah Upah Kerja ..... …………………….. Rp 292,447.50
1.0500 m2 Alucopan 0.3 (4) mm Polyester Rp 145,626.18 Rp 152,907.48
1.6000 m' Alumunium Stifner panel Rp 75,000.00 Rp 120,000.00
1.4000 m' Alumunium. Siku 30x16 Rp 75,000.00 Rp 105,000.00
2.1000 kg Bracket besi siku 70.70.7 Rp 12,000.00 Rp 25,200.00
2.0000 bh Dynabolt M 10 x 120 Rp 5,000.00 Rp 10,000.00
2.0000 bh Mur + baut M 10 x 70 Rp 2,031.00 Rp 4,062.00
0.0667 kg Zincromate Rp 50,000.00 Rp 3,333.33
0.2500 tube Sealant Rp 102,000.00 Rp 25,500.00
4.0000 bh Ramsel Nails Rp 5,000.00 Rp 20,000.00
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 466,002.82
Jumlah Upah & Bahan ..... . . . . . . . . . Rp 758,450.32
Overhead + Profit (15%) . . . . . . . . . Rp 75,845.03
Jumlah Total . . . . . . . . . Rp 834,295.35
1 m² Pasang aluminium perforated
0.080 h.o Pekerja Rp 118,000.00 Rp 9,440.00
0.800 h.o Tukang Rp 138,000.00 Rp 110,400.00
0.080 h.o Kepala Tukang Rp 143,000.00 Rp 11,440.00
0.004 h.o Mandor Rp 163,000.00 Rp 652.00
Jumlah Upah Kerja ..... . . . . . . . . . Rp 131,932.00
1.2000 m2 aluminium perforated Rp 413,380.00 Rp 496,056.00
Jumlah Biaya Bahan ..... . . . . . . . . . Rp 496,056.00
Jumlah Upah & Bahan ..... . . . . . . . . . Rp 627,988.00
Overhead + Profit (15%) . . . . . . . . . Rp 62,798.80
Jumlah Total . . . . . . . . . Rp 690,786.80

L PEKERJAAN SANITASI
1. 1 buah Pasang Kloset Duduk
3.3000 h.o pekerja Rp 118,000.00 Rp 389,400.00
1.1000 h.o tukang batu Rp 138,000.00 Rp 151,800.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.1600 h.o mandor Rp 163,000.00 Rp 26,080.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 568,710.00
1.0000 bh Kloset duduk Rp 2,700,000.00 Rp 2,700,000.00
1.0000 ls Perlengkapan 6% harga kloset Rp 162,000.00 Rp 162,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 2,862,000.00
. . . . . . . . . . Rp. 3,430,710.00
Overhead + Profit (15%) Rp. 514,606.50
Jumlah Total Rp. 3,945,316.50

2. 1 buah Pasang Kloset Jongkok Porselen


1.0000 h.o pekerja Rp 118,000.00 Rp 118,000.00
1.5000 h.o tukang batu Rp 138,000.00 Rp 207,000.00
1.5000 h.o kepala tukang Rp 143,000.00 Rp 214,500.00
0.1600 h.o mandor Rp 163,000.00 Rp 26,080.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 565,580.00

1.0000 bh Kloset jongkok porselen Rp 285,000.00 Rp 285,000.00


0.1200 sak Semen portland 50kg Rp 58,000.00 Rp 6,960.00
0.0100 m3 Pasir pasang Rp 165,000.00 Rp 1,650.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 291,960.00

Jumlah Total . . . . . . . . . . Rp. 857,540.00

3. 1 buah Pasang Kloset Jongkok Teraso


1.0000 h.o pekerja Rp 118,000.00 Rp 118,000.00
1.5000 h.o tukang batu Rp 138,000.00 Rp 207,000.00
0.3000 h.o kepala tukang Rp 143,000.00 Rp 42,900.00
0.1100 h.o mandor Rp 163,000.00 Rp 17,930.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 385,830.00

1.0000 bh Kloset jongkok teraso Rp 50,000.00 Rp 50,000.00


7.0000 bh Bata merah 5 x 11 x 22 cm Rp 1,000.00 Rp 7,000.00
0.1200 sak Semen portland 50kg Rp 58,000.00 Rp 6,960.00
0.0100 m3 Pasir pasang Rp 165,000.00 Rp 1,650.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 65,610.00

Jumlah Total . . . . . . . . . . Rp. 451,440.00

4. 1 buah Pasang Urinoir


1.0000 h.o pekerja Rp 118,000.00 Rp 118,000.00
1.0000 h.o tukang batu Rp 138,000.00 Rp 138,000.00
0.1000 h.o kepala tukang Rp 143,000.00 Rp 14,300.00
0.0500 h.o mandor Rp 163,000.00 Rp 8,150.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 278,450.00
1.0000 bh Urinoir Rp 1,750,000.00 Rp 1,750,000.00
1.0000 ls Perlengkapan 30% harga urinoir Rp 525,000.00 Rp 525,000.00
0.1200 sak Semen portland 50kg Rp 58,000.00 Rp 6,960.00
0.0100 m 3
Pasir pasang Rp 165,000.00 Rp 1,650.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 2,283,610.00
. . . . . . . . . . Rp. 2,562,060.00
Overhead + Profit (15%) Rp. 384,309.00
Jumlah Total Rp. 2,946,369.00

1 buah Memasang jet washer


0.0100 h.o Pekerja Rp 118,000.00 Rp 1,180.00
0.1000 h.o Tukang batu Rp 138,000.00 Rp 13,800.00
0.0100 h.o Kepala tukang Rp 143,000.00 Rp 1,430.00
0.0050 h.o Mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja ..... . . . . . . . . . 17,225.00
1.0000 bh Jet washer Rp 540,000.00 540,000.00
0.0250 bh Seal tape Rp 14,000.00 350.00
Jumlah Biaya Bahan ..... . . . . . . . . . 540,350.00
Jumlah Total ..... . . . . . . . . . 557,575.00
Overhead + Profit (15%) Rp. 83,636.25
Jumlah Total Rp. 641,211.25

1 buah Pasang Floor drain


0.1000 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.0100 h.o tukang batu Rp 138,000.00 Rp 1,380.00
0.1000 h.o kepala tukang Rp 143,000.00 Rp 14,300.00
0.0050 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 28,295.00
1.0000 bh Floor drain Rp 414,000.00 Rp 414,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 414,000.00
. . . . . . . . . . Rp. 442,295.00
Overhead + Profit (15%) Rp. 66,344.25
Jumlah Total Rp. 508,639.25

5. 1 buah Pasang Wastafel


1.2000 h.o pekerja Rp 118,000.00 Rp 141,600.00
1.4500 h.o tukang batu Rp 138,000.00 Rp 200,100.00
0.1500 h.o kepala tukang Rp 143,000.00 Rp 21,450.00
0.0600 h.o mandor Rp 163,000.00 Rp 9,780.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 372,930.00
1.0000 bh Wastafel Rp 644,000.00 Rp 644,000.00
1.0000 ls Perlengkapan 12% harga wastafel Rp 77,280.00 Rp 77,280.00
0.1200 sak Semen portland 50kg Rp 58,000.00 Rp 6,960.00
0.0100 m3 Pasir pasang Rp 165,000.00 Rp 1,650.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 729,890.00
. . . . . . . . . . Rp. 1,102,820.00
Overhead + Profit (15%) Rp. 165,423.00
Jumlah Total Rp. 1,268,243.00

6. 1 buah Pasang Bak Mandi teraso (volume 0,30 m3)


2.1000 h.o pekerja Rp 118,000.00 Rp 247,800.00
0.7500 h.o tukang batu Rp 138,000.00 Rp 103,500.00
0.0700 h.o kepala tukang Rp 143,000.00 Rp 10,010.00
0.1100 h.o mandor Rp 163,000.00 Rp 17,930.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 379,240.00

1.0000 bh Bak teraso Rp 200,000.00 Rp 200,000.00


0.1200 sak Semen portland 50kg Rp 165,000.00 Rp 19,800.00
0.0100 m3 Pasir pasang Rp . Rp #VALUE!
Jumlah Biaya bahan . . . . . . . . . . Rp. #VALUE!

Jumlah Total . . . . . . . . . . Rp. #VALUE!


7. 1 buah Pasang Bak Mandi Fibreglass (volume 0,30 m3)
1.8000 h.o pekerja Rp 118,000.00 Rp 212,400.00
2.7000 h.o tukang batu Rp 138,000.00 Rp 372,600.00
0.5400 h.o kepala tukang Rp 143,000.00 Rp 77,220.00
0.1100 h.o mandor Rp 163,000.00 Rp 17,930.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 680,150.00

1.0000 bh Bak fibreglass Rp 1,750,000.00 Rp 1,750,000.00


1.0000 ls Perlengkapan 18% harga bak Rp 315,000.00 Rp 315,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 2,065,000.00

Jumlah Total . . . . . . . . . . Rp. 2,745,150.00

8. 1 buah Pasang Bak Mandi Batu Bata (volume 0,30 m3)


6.0000 h.o pekerja Rp 118,000.00 Rp 708,000.00
3.0000 h.o tukang batu Rp 138,000.00 Rp 414,000.00
0.3000 h.o kepala tukang Rp 143,000.00 Rp 42,900.00
0.3000 h.o mandor Rp 163,000.00 Rp 48,900.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 1,213,800.00

238.0598 bh Bata merah 5 x 11 x 22 cm Rp 1,000.00 Rp 238,059.81


360.0000 bh Porselen (11 x 11) cm Rp 650.00 Rp 234,000.00
6.0000 kg Semen warna Rp - Rp -
2.4000 sak Semen portland 50kg Rp 165,000.00 Rp 396,000.00
0.3000 m3 Pasir pasang Rp . Rp #VALUE!
Jumlah Biaya bahan . . . . . . . . . . Rp. #VALUE!

Jumlah Total . . . . . . . . . . Rp. #VALUE!

9. 1 buah Memasang bak fibreglass volume 1 m air 3

3.0000 h.o pekerja Rp 118,000.00 Rp 354,000.00


4.5000 h.o tukang batu Rp 138,000.00 Rp 621,000.00
0.9000 h.o kepala tukang Rp 143,000.00 Rp 128,700.00
0.9000 h.o mandor Rp 163,000.00 Rp 146,700.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 1,250,400.00

1.0000 bh Bak fibreglass Rp 675,000.00 Rp 675,000.00


1.0000 ls Perlengkapan 12% harga bak Rp 81,000.00 Rp 81,000.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 756,000.00

Jumlah Total . . . . . . . . . . Rp. 2,006,400.00

10. 1m' Pasang pipa beton f 15 - 20 cm


0.1400 h.o pekerja Rp 118,000.00 Rp 16,520.00
0.0700 h.o tukang batu Rp 138,000.00 Rp 9,660.00
0.0070 h.o kepala tukang Rp 143,000.00 Rp 1,001.00
0.0070 h.o mandor Rp 163,000.00 Rp 1,141.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 28,322.00

1.1000 bh Pipa beton f 15 - 20 cm Rp 75,000.00 Rp 82,500.00


16.0690 bh Bata merah 5 x 11 x 22 cm Rp 1,000.00 Rp 16,069.04
0.0784 sak Semen portland 50kg Rp 58,000.00 Rp 4,547.20
0.0560 m3 Pasir pasang Rp 165,000.00 Rp 9,240.00
0.0240 m3 Pasir urug Rp 84,000.00 Rp 2,016.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 114,372.24

Jumlah Total . . . . . . . . . . Rp. 142,694.24

11. 1m' Pasang pipa beton f 30 - 100 cm


0.3800 h.o pekerja Rp 118,000.00 Rp 44,840.00
0.1900 h.o tukang batu Rp 138,000.00 Rp 26,220.00
0.0190 h.o kepala tukang Rp 143,000.00 Rp 2,717.00
0.0190 h.o mandor Rp 163,000.00 Rp 3,097.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 76,874.00
1.1000 bh Pipa beton f 30 - 100 cm Rp 300,000.00 Rp 330,000.00
327.3322 bh Bata merah 5 x 11 x 22 cm Rp 1,000.00 Rp 327,332.24
0.2060 sak Semen portland 50kg Rp 58,000.00 Rp 11,948.00
0.0610 m3 Pasir pasang Rp 165,000.00 Rp 10,065.00
0.0690 m3 Pasir urug Rp 84,000.00 Rp 5,796.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 685,141.24

Jumlah Total . . . . . . . . . . Rp. 762,015.24

12. 1 m' Memasang pipa galvanis diameter /2" - 1"


1

0.0540 h.o pekerja Rp 118,000.00 Rp 6,372.00


0.0900 h.o tukang pipa Rp 138,000.00 Rp 12,420.00
0.0090 h.o kepala tukang Rp 143,000.00 Rp 1,287.00
0.0270 h.o mandor Rp 163,000.00 Rp 4,401.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 24,480.00

1.2000 m' Pipa galvanis f 1/2 " - 1" Rp 21,666.67 Rp 26,000.00


1.0000 ls Perlengkapan ( 35% harga pipa ) Rp 7,583.33 Rp 7,583.33
Jumlah Biaya bahan . . . . . . . . . . Rp. 33,583.33

Jumlah Total . . . . . . . . . . Rp. 58,063.33

13. 1 m' Memasang pipa galvanis diameter 11/2" - 3"


0.1080 h.o pekerja Rp 118,000.00 Rp 12,744.00
0.1800 h.o tukang pipa Rp 138,000.00 Rp 24,840.00
0.0180 h.o kepala tukang Rp 143,000.00 Rp 2,574.00
0.0054 h.o mandor Rp 163,000.00 Rp 880.20
Jumlah Upah Kerja . . . . . . . . . . Rp. 41,038.20
1.2000 m' Pipa galvanis Rp 67,000.00 Rp 80,400.00
1.0000 ls Perlengkapan ( 35% harga pipa ) Rp 23,450.00 Rp 23,450.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 103,850.00

Jumlah Total . . . . . . . . . . Rp. 144,888.20


14. 1 m' Memasang pipa galvanis diameter 3"
0.1350 h.o pekerja Rp 118,000.00 Rp 15,930.00
0.2250 h.o tukang pipa Rp 138,000.00 Rp 31,050.00
0.0225 h.o kepala tukang Rp 143,000.00 Rp 3,217.50
0.0068 h.o mandor Rp 163,000.00 Rp 1,108.40
Jumlah Upah Kerja . . . . . . . . . . Rp. 51,305.90

1.2000 m' Pipa galvanis Rp 575,000.00 Rp 690,000.00


1.0000 ls Perlengkapan ( 35% harga pipa ) Rp 201,250.00 Rp 201,250.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 891,250.00

Jumlah Total . . . . . . . . . . Rp. 942,555.90

15 1 m' Memasang pipa PVC tipe AW diameter 1/2" - 21/2"


0.0360 h.o pekerja Rp 118,000.00 Rp 4,248.00

0.0600 h.o tukang pipa Rp 138,000.00 Rp 8,280.00


0.0060 h.o kepala tukang Rp 143,000.00 Rp 858.00
0.0018 h.o mandor Rp 163,000.00 Rp 293.40
Jumlah Upah Kerja . . . . . . . . . . Rp. 13,679.40

m' Pipa PVC tipe AW f /2" - 2 /2"


1 1
1.2000 Rp 9,500.00 Rp 11,400.00
1.0000 ls Perlengkapan ( 35% harga pipa ) Rp 3,325.00 Rp 3,325.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 14,725.00

Jumlah Total . . . . . . . . . . Rp. 28,404.40

16. 1 m' Memasang pipa PVC tipe AW diameter 3" - 4"


0.0810 h.o pekerja Rp 118,000.00 Rp 9,558.00
0.1350 h.o tukang pipa Rp 138,000.00 Rp 18,630.00
0.0135 h.o kepala tukang Rp 143,000.00 Rp 1,930.50
0.0041 h.o mandor Rp 163,000.00 Rp 668.30
Jumlah Upah Kerja . . . . . . . . . . Rp. 30,786.80

1.2000 m Pipa PVC tipe AW f 3 " - 4" Rp 14,500.00 Rp 17,400.00


1.0000 ls Perlengkapan ( 35% harga pipa ) Rp 5,075.00 Rp 5,075.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 22,475.00

Jumlah Total . . . . . . . . . . Rp. 53,261.80

17. 1 buah Memasang kran diameter 3/4" atau 1/2"


0.0100 h.o pekerja Rp 118,000.00 Rp 1,180.00
0.1000 h.o tukang pipa Rp 138,000.00 Rp 13,800.00
0.0100 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.0050 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . . . . . . . . . Rp. 17,225.00
1.0000 bh Kran air Rp 50,000.00 Rp 50,000.00
0.0250 bh Seal tape Rp 5,000.00 Rp 125.00
Jumlah Biaya bahan . . . . . . . . . . Rp. 50,125.00
Jumlah Total . . . . . . . . . . Rp. 67,350.00
Overhead + Profit (15%) Rp. 10,102.50
Jumlah Total Rp. 77,452.50
BAB I

HARGA SATUAN PEKERJAAN


TRIWULAN III TAHUN 2016

ANA HARGA BAHAN UPAH KERJA + SEWA ALAT JUMLAH


URAIAN PEKERJAAN
LISA ( RP.) ( RP.) ( RP.)

A. PEKERJAAN TANAH

A.1 1 m3 Galian tanah biasa sedalam 1 meter 67,150.00 67,150.00


A.2 1 m3 Galian tanah biasa sedalam 2 meter - 88,180.00 88,180.00
A.3 1 m3 Galian tanah biasa sedalam 3 meter - 123,286.25 123,286.25
A.4 1 m3 Galian tanah keras sedalam 1 meter - 108,507.50 108,507.50
A.5 1 m3 Galian tanah lumpur sedalam 1 meter - 110,643.00 110,643.00
A.6 1 m3 Galian tanah cadas sedalam 1 meter - 167,875.00 167,875.00
A.7 1 m3 Pembuangan tanah sampai dengan sejauh 150 m'. - 69,038.00 69,038.00
A.8 1 m3 Urugan pasir 100,800.00 37,030.00 137,830.00
A.9 1 m3 Urugan sirtu 139,200.00 33,575.00 172,775.00
A.10 1 m3 Urugan kembali - 67,150.00 67,150.00
A.11 1 m3 Memindahkan dan meratakan tanah menggunakan - 2,913.89 2,913.89
bulldozer
A.12 1 m3 Mengeruk/ leveling tanah menggunakan dozer shovel - 2,776.49 2,776.49
A.13 1 m3 Mengeruk tanah menggunakan excavator hidraulic - 2,797.37 2,797.37
A.14 1 m3 Memindahkan dan meratakan tanah menggunakan - 2,797.37 2,797.37
loader (bucket 1,7 m3)
A.15 1 m3 Pengangkutan tanah menggunakan dump truck - 34,313.08 34,313.08
(Jarak angkut sampai dengan 1 km)
A.16 1 m3 Air untuk pembasahan tanah menggunakan tangki - 148,820.00 148,820.00
air dengan pompa (jarak angkut + 10 km)

B. PEKERJAAN PERKERASAN JALAN DAN LAPANGAN


PENUMPUKAN

B.1 1 m3 Lapis Pondasi Atas Agregat/ Batu Pecah Kelas A 415,560.00 8,166.67 423,726.67
(menggunakan alat)
B.2 1 m3 Lapis Pondasi Atas Agregat/ Batu Pecah Kelas A 414,950.00 127,366.67 542,316.67
(manual)
B.3 1 m3 Lapis Pondasi Bawah Sirtu (menggunakan alat) 147,706.67 8,166.67 155,873.33
B.4 1 m3 Lapis Pondasi Bawah Sirtu (manual) 100,800.00 127,366.67 228,166.67
B.5 1 m3 Lapis Penetrasi/Pondasi Atas Macadam tebal 7 cm. 1,766,786.43 373,028.55 2,139,814.98
(manual)
B.6 1 m2 Penghamparan Lapis Tipis Aspal Pasir tebal padat 6,900.00 902.29 7,802.29
2 cm (menggunakan alat)
B.7 1 m2 Penghamparan Lapis Tipis Aspal Pasir tebal padat 6,900.00 1,429.38 8,329.38
2 cm (manual)
B.8 1 m2 Penghamparan Lapis Tipis Asbuton & Agregat 6,900.00 3,678.67 10,578.67
halus tebal padat 3 cm (manual)
B.9 1 m2 Penghamparan Lapis Tipis Asbuton & Pasir tebal 6,900.00 1,996.67 8,896.67
padat 3 cm (menggunakan alat)
B.10 1 m2 Penghamparan Lapis Tipis Aspal Beton tebal padat 106,233.33 1,996.67 108,230.00
3 cm (menggunakan alat)
B.11 1 m2 Penghamparan Lapis Tipis Aspal Dan Agregat 846,900.00 2,626.00 849,526.00
Halus tebal padat 3 cm (manual)
B.12 1 m2 Penghamparan Lapis Aspal Beton tebal padat 7,065.00 4,114.44 11,179.44
5 cm (menggunakan alat)
B.13 1 m2 Perbaikan Lubang Jalan Aspal (manual) kedalaman 65,785.71 41,742.86 107,528.57
rata-rata 10 cm
B.14 1 m2 Perbaikan Ambles/Penurunan Jalan Aspal (manual) 180,600.00 126,150.00 306,750.00
B.15 1 m2 Pemasangan paving block 115,540.00 63,751.00 179,291.00
ANA HARGA BAHAN UPAH KERJA + SEWA ALAT JUMLAH
URAIAN PEKERJAAN
LISA ( RP.) ( RP.) ( RP.)

C. PEKERJAAN KAYU

C.1 1 m' Pengukuran dan pemasangan bouwplank 40,694.00 27,845.00 68,539.00


C.2 1 m2 Pasang kaso + reng genteng biasa/kodok 42,000.00 27,845.00 69,845.00
C.3 1 m2 Pasang kaso + reng genteng beton 48,500.00 27,845.00 76,345.00
C.4 1 m2 Pasang kaso + reng atap sirap 540,250.00 33,414.00 573,664.00
C.5 1 m3 Pasang konstruksi kuda-kuda kayu, perancah, gelagar 7,056,000.00 2,332,200.00 9,388,200.00
jembatan, balok pemikul, gording.
C.6 1 m3 Pasang kusen pintu dan jendela kayu 14,326,900.00 3,526,900.00 17,853,800.00
C.7 1 m2 Pasang pintu klamp kayu 541,000.00 204,149.00 745,149.00
C.8 1 m2 Pasang pintu panil kayu 600,000.00 506,900.00 1,106,900.00
C.9 1 m2 Pasang pintu plywood/teakwood/triplek rangkap, rangka 454,600.00 408,135.00 862,735.00
kayu.
C.10 1 m2 Pasang pintu dan jendela kaca 525,000.00 405,520.00 930,520.00
C.11 1 m2 Pasang Jaluzi/ ventilasi mati kusen kayu 903,000.00 367,675.00 1,270,675.00
C.12 1 m2 Pasang pintu dan jendela Jaluzi kayu 960,000.00 623,800.00 1,583,800.00
C.13 1 m2 Pasang kayu rangka plafon (1 x 1) m 110,000.00 68,000.00 178,000.00
C.14 1 m2 Pasang plafon asbes 73,050.00 14,445.50 87,495.50
C.15 1 m2 Pasang plafon tripleks tebal … mm 25,725.00 24,060.50 49,785.50
C.16 1 m2 Pasang plafon Gypsum 28,974.00 20,230.00 49,204.00
C.17 1 m' Pasang list plafon kayu profil 10,350.00 14,004.00 24,354.00
C.18 1 m' Pasang lisplang ukuran (3 x 20) cm 110,250.00 43,075.00 153,325.00
C.19 1 m' Pasang lisplang ukuran (3 x 30) cm 167,250.00 47,301.00 214,551.00
C.20 1 m2 Pasang rangka dinding sekat kayu 285,000.00 98,460.00 383,460.00
C.21 1 m2 Pasang dinding sekat plywood/teakwood/triplek rangkap, 345,160.00 116,610.00 461,770.00
rangka kayu.
C.22 1 m2 Pasang plywood/triplek tebal 4 mm untuk dinding 23,850.00 14,584.40 38,434.40
C.23 1 m2 Pasang Begisting untuk pondasi 62,140.00 105,196.00 167,336.00
C.24 1 m2 Pasang Begisting untuk sloof 67,595.00 75,813.00 143,408.00
C.25 1 m2 Pasang Begisting untuk kolom 171,765.00 133,518.00 305,283.00
C.26 1 m2 Pasang Begisting untuk balok 176,640.00 88,997.00 265,637.00
C.27 1 m2 Pasang Begisting untuk lantai/pelat 351,765.00 88,997.00 440,762.00
C.28 1 m2 Pasang Begisting untuk dinding 429,960.00 88,997.00 518,957.00
C.29 1 m2 Pasang Begisting untuk tangga 291,210.00 88,997.00 380,207.00

D. PEKERJAAN BETON, PASANGAN DAN PLESTERAN

D.1 1 m3 Beton dengan mutu K-275 (manual) 899,000.00 909,200.00 1,808,200.00


D.2 1 m3 Beton dengan mutu K-225 (manual) 849,830.00 909,200.00 1,759,030.00
D.3 1 m3 Beton K-125 menggunakan Molen 125 ltr 689,634.78 557,005.22 1,246,640.00
D.4 1 m3 Beton K-175 menggunakan Molen 125 ltr 762,062.50 536,606.67 1,298,669.17
D.5 1 m3 Beton K-225 menggunakan Molen 125 ltr 814,962.16 523,926.49 1,338,888.65
D.6 1 m3 Beton K-125 menggunakan Molen 250 ltr 689,634.78 455,874.78 1,145,509.57
D.7 1 m3 Beton K-175 menggunakan Molen 250 ltr 762,062.50 532,752.50 1,294,815.00
D.8 1 m3 Beton K-225 menggunakan Molen 250 ltr 812,218.18 473,530.91 1,285,749.09
D.9 1 m3 Beton K-175 menggunakan Molen 500 ltr 762,062.50 466,033.75 1,228,096.25
D.10 1 m3 Beton K-225 menggunakan Molen 500 ltr 812,218.18 422,712.73 1,234,930.91
D.11 1 m3 Beton K-275 menggunakan Molen 500 ltr 907,750.00 393,106.67 1,300,856.67
D.12 1 m3 Beton K-350 menggunakan Molen 500 ltr 934,933.33 414,817.78 1,349,751.11
D.13 1 kg Pembesian dengan besi polos atau besi ulir 12,930.00 1,941.00 14,871.00
D.14 1 m3 beton bertulang 1 PC : 2 Pasir : 3 Batu Pecah 705,920.00 245,815.00 951,735.00
D.15 1 m3 beton bertulang 1 PC : 2 Pasir : 4 Batu Pecah 804,050.00 245,815.00 1,049,865.00
D.16 1 m3 beton bertulang 1 PC : 2 Pasir : 2,5 Batu Pecah 815,720.00 245,815.00 1,061,535.00
D.17 1 m3 beton bertulang 1 PC : 1,5 Pasir : 3 Batu Pecah 726,420.00 245,815.00 972,235.00
D.18 1 m3 beton bertulang 1 PC : 1 Pasir : 2 Batu Pecah 949,690.00 245,815.00 1,195,505.00
D.19 1 m3 beton tumbuk 1 PC : 3 Pasir : 5 Batu Pecah 730,180.00 245,815.00 975,995.00
D.20 1 m3 beton tumbuk 1 PC : 3 Pasir : 6 Batu Pecah 729,070.00 245,815.00 974,885.00
D.21 1 m3 beton tumbuk 1 PC : 4 Pasir : 6 Batu Pecah 686,230.00 245,815.00 932,045.00
ANA HARGA BAHAN UPAH KERJA + SEWA ALAT JUMLAH
URAIAN PEKERJAAN
LISA ( RP.) ( RP.) ( RP.)
D.22 1 m3 Pasang pondasi batu kosong 409,500.00 157,794.00 567,294.00

D.23 1 m3 Pasang pondasi batu kali, 1Pc : 3 Pasir 644,345.00 280,605.00 924,950.00
D.24 1 m3 Pasang pondasi batu kali, 1Pc : 4 Pasir 604,880.00 280,605.00 885,485.00
D.25 1 m3 Pasang pondasi sumuran diameter 100 cm 835,550.00 339,570.00 1,175,120.00
D.26 1 m2 Pasangan bata merah tebal 1 bata, 1PC : 1 Pasir 224,009.80 112,050.00 336,059.80
D.27 1 m2 Pasangan bata merah tebal 1 bata, 1PC : 2 Pasir 203,660.00 112,050.00 315,710.00
D.28 1 m2 Pasangan bata merah tebal 1 bata, 1PC : 3 Pasir 193,237.00 112,050.00 305,287.00
D.29 1 m2 Pasangan bata merah tebal 1 bata, 1PC : 4 Pasir 186,143.00 112,050.00 298,193.00
D.30 1 m2 Pasangan bata merah tebal 1 bata, 1PC : 5 Pasir 182,582.00 112,050.00 294,632.00
D.31 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 1 Pasir 106,868.00 55,435.00 162,303.00
D.32 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 2 Pasir 98,252.00 55,435.00 153,687.00
D.33 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 3 Pasir 75,769.20 53,075.00 128,844.20
D.34 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 4 Pasir 72,935.00 55,435.00 128,370.00
D.35 1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 5 Pasir 71,153.80 55,435.00 126,588.80
D.36 1 m2 Pasangan dinding roster/terawang (12 x 11 x 24) cm 20,623.00 53,075.00 73,698.00
D.37 1 m2 Plesteran trasram 1 PC : 1 pasir, tebal 1,5 cm 17,132.20 48,075.00 65,207.20
D.38 1 m2 Plesteran trasram 1 PC : 2 pasir, tebal 1,5 cm 12,688.20 48,075.00 60,763.20
D.39 1 m2 Plesteran 1 PC : 3 pasir, tebal 1,5 cm 11,311.80 60,690.00 72,001.80
D.40 1 m2 Plesteran 1 PC : 4 pasir, tebal 1,5 cm 9,332.00 48,075.00 57,407.00
D.41 1 m2 Plesteran 1 PC : 5 pasir, tebal 1,5 cm 8,641.20 48,075.00 56,716.20
-

E. PEKERJAAN PANGAN TEGEL LANTAI DAN DINDING


E.1 1 m2 Pasang lantai ubin granito ukuran 60x60 cm 268,536.00 48,552.00 317,088.00
E.2 1 m2 Pasang lantai ubin granito ukuran 60x60 cm 368,238.00 48,552.00 416,790.00
E.3 1 m2 Pasang lantai keramik #VALUE! 131,355.00 #VALUE!
E.4 1 m2 Pasang lantai mozaik #VALUE! 131,355.00 #VALUE!
E.5 1 m2 Pasang lantai marmer #VALUE! 131,355.00 #VALUE!
E.6 1 m2 Pasang lantai karpet 82,750.00 47,336.50 130,086.50
E.7 1 m2 Pasang dinding porselin, keramik #VALUE! 154,200.00 #VALUE!
E.8 1 m2 Pasang dinding marmer #VALUE! 189,660.00 #VALUE!
E.9 1 m2 Pasang dinding batu tempel #VALUE! 131,355.00 #VALUE!
E.10 ### #REF! #REF! #REF!
E.11 ### #REF! #REF! #REF!
E.12 ### #REF! #REF! #REF!
E.13 ### #REF! #REF! #REF!
E.14 ### #REF! #REF! #REF!
E.15 ### #REF! #REF! #REF!
E.16 ### #REF! #REF! #REF!
E.17 ### #REF! #REF! #REF!
E.18 ### #REF! #REF! #REF!
E.19 ### #REF! #REF! #REF!
E.20 ### #REF! #REF! #REF!
E.21 ### #REF! #REF! #REF!
E.22 ### #REF! #REF! #REF!
E.23 ### #REF! #REF! #REF!
E.24 ### #REF! #REF! #REF!
E.25 ### #REF! #REF! #REF!
E.26 ### #REF! #REF! #REF!
E.27 ### #REF! #REF! #REF!
E.28 ### #REF! #REF! #REF!
E.29 ### #REF! #REF! #REF!

G PEKERJAAN ATAP
ANA HARGA BAHAN UPAH KERJA + SEWA ALAT JUMLAH
URAIAN PEKERJAAN
LISA ( RP.) ( RP.) ( RP.)
G.1 1 m2 Pasang atap genteng - 30,498.00 30,498.00
G.2 1 m' Pasang nok/bubungan genteng 5,465.60 77,986.00 83,451.60
G.3 1 m2 Pasang atap genteng beton 1,350.00 40,460.00 41,810.00
G.4 1 m' Pasang nok/bubungan genteng beton 172,780.56 77,986.00 250,766.56
G.5 1 m2 Pasang atap sirap 909,000.00 58,967.00 967,967.00
G.6 1 m' Pasang nok/bubungan sirap 85,400.00 53,803.00 139,203.00
G.7 1 m' Pasang atap genteng metal (multy roof) 1,000.00 38,993.00 39,993.00
G.8 1 m' Pasang nok/bubungan genteng metal 50,500.00 54,464.00 104,964.00
G.9 1 m2 Pasang atap seng gelombang 41,000.00 24,276.00 65,276.00
G.10 1 m' Pasang nok/bubungan atap seng 18,200.00 29,482.00 47,682.00
G.11 1 m2 Pasang atap aluminium 89,422.00 30,172.00 119,594.00
G.12 1 m' Pasang nok/bubungan aluminium #VALUE! 152,860.00 #VALUE!
G.13 1 m2 Pasang atap asbes gelombang 428,400.00 29,318.00 457,718.00
G.14 1 m' Pasang nok/bubungan stel gelombang 0,92 m 270,000.00 29,673.00 299,673.00
G.15 1 m' Pasang nok/bubungan stel rata 0,92 m 270,000.00 35,011.00 305,011.00
G.16 1 m' Pasang nok/bubungan paten 0,92 m 348,000.00 29,673.00 377,673.00
G.17 1 m2 Pasang atap tembus cahaya dari fibreglass (180 x 90 cm) 1,350.00 27,908.00 29,258.00
G.18 1 m2 Pasang alas atap aluminium foil/sisalation - 26,619.00 26,619.00

H PEKERJAAN PENGECATAN

H.1 1 m2 Mengerok karat cat lama permukaan baja (manual) - 18,857.50 18,857.50
H.2 1 m2 Mengikis/mengerok permukaan cat tembok lama 1,000.00 18,107.50 19,107.50
H.3 1 m2 Membersihkan permukaan tembok yang pernah dicat 1,250.00 18,107.50 19,357.50
H.4 1 m2 Mengerok karat/cat lama permukaan baja dengan sand 40,000.00 605,500.00 645,500.00
blasting, tingkat kebersihan Sa 2 1/2
H.5 1 m2 Melabur tembok dengan kapur sirih 4,775.00 18,259.80 23,034.80
H.6 1 m2 Melabur tembok lama dengan kapur sirih ( untuk 4,400.00 5,889.00 10,289.00
pemeliharaan ).
H.7 1 m2 Pengecatan tembok baru ( 1x lapis plamur, 3x lapis cat 29,500.00 12,362.40 41,862.40
tembok ).
H.8 1 m2 Pengecatan tembok lama ( 3x lapis cat tembok ) 19,500.00 10,108.10 29,608.10
H.9 1 m2 Pengecatan plafond baru ( 1x lapis plamur, 3x lapis cat t 49,503.60 18,543.60 68,047.20
H.10 1 m2 Pengecatan plafond lama ( 3x lapis cat tembok ) #VALUE! 15,162.15 #VALUE!
H.11 1 m2 Pasang wallpaper - 30,653.50 30,653.50
H.12 1 m2 Mendempul dan menggosok kayu 150.00 11,219.50 11,369.50

H.13 1 m2 Pengecatan bidang kayu lama - 20,090.00 20,090.00


H.14 1 m2 Pengecatan bidang kayu baru ( 1x lapis plamur, 3x lapis - 10,767.50 10,767.50
cat kayu ).
H.15 1 m2 Pelaburan bidang kayu dengan teak oil 9,720.00 13,821.50 23,541.50
H.16 1 m2 Pelaburan bidang kayu dengan politur 62,094.00 8,280.00 70,374.00
H.17 1 m2 Pelaburan bidang kayu dengan cat residu dan ter 12,950.00 12,778.00 25,728.00
H.18 1 m2 Pelaburan bidang kayu dengan vernis 6,550.00 43,655.50 50,205.50
H.19 1 m2 pengecatan permukaan baja/seng 3x lapis 3,630.00 34,450.00 38,080.00
H.20 1 m2 Pengecatan permukaan baja dengan meni besi 6,400.00 32,090.00 38,490.00

I. PEKERJAAN PEMBONGKARAN

I.1 1 m2 Membongkar dinding tebal 2 bata merah (dipakai lagi) - 30,083.20 30,083.20
I.2 1 m2 Membongkar dinding tebal < 2 bata merah (dipakai lagi) - 14,128.80 14,128.80
I.3 1 m2 Mengupas plesteran - 7,064.40 7,064.40
I.4 1 m2 Membongkar atap sirap, genteng, asbes gelombang - 6,055.20 6,055.20
( dipakai lagi ).
I.5 1 m2 Membongkar dan menurunkan atap seng - 14,960.00 14,960.00
I.6 1 m2 Membongkar rangka atap kayu (kayu dipakai lagi) - 13,138.00 13,138.00
I.7 1 m2 Membongkar lantai papan kayu tebal 8 Cm - 25,776.00 25,776.00
I.8 1 m3 Membongkar balok gelagar (kayu dipakai lagi) - 1,134,720.00 1,134,720.00
I.9 1 m2 Membongkar paving block - 13,430.00 13,430.00
I.10 1 bh Membongkar dan melepas fender - 675,200.00 675,200.00
ANA HARGA BAHAN UPAH KERJA + SEWA ALAT JUMLAH
URAIAN PEKERJAAN
LISA ( RP.) ( RP.) ( RP.)
I.11 1 kg Membongkar rangka baja gudang - 2,532.20 2,532.20
I.12 1 m2 Membongkar Dinding Sekat ( Aluminium+ Rangka Kayu+ - 33,575.00 33,575.00
I.13 1 m2 Membongkar perkerasan lama (serifying) tebal 10 cm - 87,778.00 87,778.00
Tripleks + Kaca ).

J. PEKERJAAN KUNCI DAN KACA

J.1 1 buah Pasang kunci tanam antik 348,949.00 98,949.00 447,898.00


J.2 1 buah Pasang kunci tanam biasa 80,000.00 72,425.00 152,425.00
J.3 1 buah Pasang kunci tanam kamar mandi / kunci silinder - 407.50 407.50
J.4 1 buah Pasang engsel pintu / spring knip 35,000.00 122.25 35,122.25
J.5 1 buah Pasang engsel jendela kupu-kupu / door stop 25,000.00 81.50 25,081.50
J.6 1 buah Pasang engsel angin / kunci selot 35,000.00 1,630.00 36,630.00
J.7 1 buah Pasang door closer / door holder 332,457.50 82,457.50 414,915.00
J.8 1 buah Pasang kunci lemari - 182,000.00 182,000.00
J.9 1 m2 Pasang kaca tebal 3 - 5 mm 166,500.00 24,737.25 191,237.25

K PEKERJAAN PASANG BESI DAN ALUMINIUM

K.1 1 Kg Pasang rangka baja profil WF, C, I, L, O - 8,814.90 8,814.90


K.2 1 m2 Pasang pintu besi/baja 550,000.00 180,911.00 730,911.00
K.3 1 m2 Pasang jendela besi 1,650,000.00 284,670.75 1,934,670.75
K.4 1 m2 Pasang pintu gulung besi 550,000.00 325,338.00 875,338.00
K.5 1 m2 Pasang pintu lipat besi / pintu aluminium 250,000.00 284,662.60 534,662.60
K.6 1 m2 Pasang rolling door #REF! 346,762.60 #REF!
K.7 1 m2 Pasang horizontal/vertical blinds 800,000.00 94,890.25 894,890.25
K.9 1 m2 Pasang terali besi 253,000.00 309,013.80 562,013.80
K.10 1 m2 Pasang kawat (harmonika, nyamuk, kassa, burung) 66,040.00 27,111.50 93,151.50
K.12 1 bh Pasang Cleat 17,500.00 53,720.00 71,220.00
K.13 1 m' Pasang List Dilatasi Besi Siku 126,510.83 53,720.00 180,230.83
K.14 1 m' Pasang Rangka Aluminium 156,000.00 43,645.00 199,645.00
K.15 1 m2 Pasang Rangka Hollow 1 x 2 12,000.00 156,724.00 168,724.00
K.16 1 m2 Pasang Pintu Dorong Kaca 883,900.00 89,872.50 973,772.50
K.18 1 m' Pasang talang datar seng BJLS 40,655.00 76,678.75 117,333.75
K.19 1 m' Pasang talang miring seng BJLS 114,155.00 76,678.75 190,833.75
K.20 1 m' Pasang talang 1/2 lingkaran D-10cm, seng BJLS 113,850.00 55,978.75 169,828.75

L. PEKERJAAN SANITASI

L.1 1 buah Pasang Kloset Duduk 3,430,710.00 568,710.00 3,999,420.00


L.2 1 buah Pasang Kloset Jongkok Porselen 291,960.00 565,580.00 857,540.00
L.3 1 buah Pasang Kloset Jongkok Teraso 65,610.00 385,830.00 451,440.00
L.4 1 buah Pasang Urinoir 2,562,060.00 278,450.00 2,840,510.00
L.5 1 buah Pasang Wastafel 1,102,820.00 372,930.00 1,475,750.00
L.6 1 buah Pasang Bak Mandi teraso (volume 0,30 m3) #VALUE! 379,240.00 #VALUE!
L.7 1 buah Pasang Bak Mandi Fibreglass (volume 0,30 m3) 2,065,000.00 680,150.00 2,745,150.00
L.8 1 buah Pasang Bak Mandi Batu Bata (volume 0,30 m3) #VALUE! 1,213,800.00 #VALUE!
L.9 1 buah Memasang bak fibreglass volume 1 m3 air 756,000.00 1,250,400.00 2,006,400.00
L.10 1 m' Pasang pipa beton f 15 - 20 cm 114,372.24 28,322.00 142,694.24
L.11 1 m' Pasang pipa beton f 30 - 100 cm 685,141.24 76,874.00 762,015.24
L.12 1 m' Memasang pipa galvanis diameter 1/2" - 1" 33,583.33 24,480.00 58,063.33
L.13 1 m' Memasang pipa galvanis diameter 1 1/2" - 3" 103,850.00 41,038.20 144,888.20
L.14 1 m' Memasang pipa galvanis diameter 4" 891,250.00 51,305.90 942,555.90
L.15 1 m' Memasang pipa PVC tipe AW diameter 1/2" - 21/2" 14,725.00 13,679.40 28,404.40
L.16 1 m' Memasang pipa PVC tipe AW diameter 3" - 4" 22,475.00 30,786.80 53,261.80
L.17 1 buah Memasang kran diameter 3/4" atau 1/2" 67,350.00 17,225.00 84,575.00

Makassar, Agustus 2016


ANA HARGA BAHAN UPAH KERJA + SEWA ALAT JUMLAH
URAIAN PEKERJAAN
LISA ( RP.) ( RP.) ( RP.)
TIM PENYUSUN HARGA SATUAN UPAH,
BAHAN DAN ALAT TAHUN 2016

1. NAJEMUDIN : …………………………
MENGETAHUI (KETUA)
MANAGER TEKNIK
2. HERMAJI MIFTAH : …………………………
(SEKRETARIS)

JUNAEDI ABDULLAH 3. MATHEUS DEMONG : …………………………


(ANGGOTA)
MENYETUJUI
GENERAL MANAGER 4. ZULKARNAIN : …………………………
(ANGGOTA)

5. ROMI DELAROSA : …………………………


JOSEF BENYY ROHY (ANGGOTA)
BAB III

DAFTAR HARGA SATUAN


BAHAN, UPAH KERJA, SEWA ALAT & ATK
TRIWULAN I TAHUN 2018

HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6

A. BAHAN DASAR

1 Batu.
a. Kali m³ 220,000 160,000 176,000
b. Gunung/ Belah/ Karang m³ 300,000 160,000 176,000
c. Kerikil m³ 250,000 300,000 330,000
d. Pecah : - 7 - 10 Cm. m³ 300,000 300,000 330,000
- 5-7 Cm. m³ 420,000 420,000 462,000
- 3-5 Cm. m³ 450,000 275,000 302,500
- 2-3 Cm. m³ 450,000 275,000 302,500
- 1-2 Cm. (Split). m³ 260,000 450,000 495,000
- 0,5 - 1 Cm. (Chiping). m³ 294,300 350,000 385,000
2 Pasir : - Timbunan/ Urug. m³ 84,000 160,000 176,000
- Pasangan. m³ 165,000 160,000 176,000
- Beton. m³ 165,000 160,000 176,000
- Plesteran/ Halus. m³ 200,000 160,000 176,000
3 Tanah. - Timbunan/ Urug. m³ 175,000 85,000 93,500
- Gembur (Ut.Tanaman). m³ 44,000 44,000 48,400
4 Pasir Batu (Sirtu). m³ 115,600 250,000 275,000
5 Batu Olahan : - Bata/Merah (kwalitas I) bh 600 500 550
- Bata/Merah (ukr. 8,5 x 18,5 x 4) bh 600 500 550
- Paving Block ( Bo ). Lokal m² 66,700 -
- Paving Block ( K.300 ) Lokal -
- Tebal 6 cm m² 77,000 -
- Tebal 8 cm m² 110,500 62,000 68,200
- Paving Block ( K.400 ) Lokal tebal=10cm m² 129,800 98,000 107,800
- Paving Block ( K.400 ) m² -
- Roster Kerawang. bh 95,000 104,500
- Kansteen Taman m' 55,000 60,500
6 Beton Ready Mix : -
- K-175 m³ 815,000 850,000 935,000
- K-225 m³ 944,000 860,000 946,000
- K-250 m³ 963,600 880,000 968,000
- K-275 m³ 988,000 900,000 990,000
- K-300 m³ 1,000,000 920,000 1,012,000
- K-350 m³ 1,070,000 960,000 1,056,000
- K-400 m³ 1,120,000 1,020,000 1,122,000
- K-450 m³ 1,180,000 1,060,000 1,166,000
- K-500 m³ 1,235,000 1,100,000 1,210,000
- K-600 m³ -
- K-800 m³ -
- K-1000 m³ -
- K-1200 m³ -
- K-1500 m³ -
6 Kapur Pasangan. m³ -
7 Semen (PC). -
a. Tonasa : - 50 Kg. zak 58,000 58,000 63,800
- 40 Kg. zak 50,000 48,000 52,800
b. Bosowa : - 50 Kg. zak 58,000 63,800
- 40 Kg. zak 45,000 46,000 50,600
c. Tiga Roda - 50 Kg. zak -
- 40 Kg. zak 45,000 45,000 49,500
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
d. Semen Putih Tiga Roda zak 45,000 45,000 49,500
e. Semen Warna kg -
- AM 50 kg 20,000 16,000 17,600
- AM 53 kg 20,000 16,000 17,600
f. Semen mortal kg 15,000 16,500
-
B. BAHAN KAYU -
-
1 Kayu Kelas I (satu) -
a. Balok gergaji Sawmil. m³ 9,000,000 8,500,000 9,350,000
b. Papan gergaji Sawmil. m³ 15,000,000 14,000,000 15,400,000
2 Kayu Kelas II (dua) -
a. Balok. m³ 3,250,000 3,000,000 3,300,000
-
-
b. Papan. m³ 3,750,000 3,000,000 3,300,000
c. List Profil 2 x 3 cm. m¹ 36,600 36,600 40,260
d. List Profil 3 x 3 cm. m¹ 71,000 71,000 78,100
e. List Profil 4 x 4 cm. m¹ 31,800 31,800 34,980
f. List Profil 4 x 5 cm. m¹ 9,000 9,000 9,900
3 Kayu Kelas III (tiga) -
a. Balok. m³ 2,085,000 2,000,000 2,200,000
b. Papan. m³ 2,182,000 2,000,000 2,200,000
4 Kayu Sungkai m² 115,000 126,500
-
C. BAHAN BAMBU -
a. Besar btg 40,000 30,000 33,000
b. Sedang btg 30,000 25,000 27,500
c. Kecil btg 25,000 20,000 22,000
-
D. BAHAN LANTAI -
-
1 Tegel PC : -
a. PC abu-abu 20 x 20 cm. dos 48,000 58,000 63,800
b. PC abu-abu 30 x 30 cm. dos 49,700 48,500 53,350
c. PC abu-abu 40 x 40 cm. dos 107,000 50,000 55,000
d. PC warna 20 x 20 cm. dos 88,000 48,000 52,800
e. PC warna 30 x 30 cm. dos 53,000 48,500 53,350
f. PC warna 40 x 40 cm. dos 58,000 50,000 55,000
g. PC badak 30 x 30 cm. dos 71,500 65,000 71,500
h. PC wafel 20 x 20 cm. dos 60,000 66,000
i. PC wafel 30 x 30 cm. dos 60,000 66,000
2. Tegel Keramik : -
Lantai -
Merk " Roman ". -
a. Warna 20 x 25 cm dos 62,000 68,200
b. Warna 40 x 40 cm dos 137,500 125,000 137,500
c. Warna 50 x 50 cm dos 159,500 145,000 159,500
d. Warna 50 x 50 cm (Merk Habitat) dos 103,000 113,300
Merk " KIA" -
a. Putih 20 x 20 cm. dos 48,000 48,000 52,800
b. Putih 30 x 30 cm. dos 50,000 48,500 53,350
c. Warna 30 x 30 cm. dos 53,000 60,000 66,000
d. Warna 40 x 40 cm. dos 58,000 70,000 77,000
e. Warna 30 x 30 cm (Platinum) dos 88,000 60,000 66,000
f. Warna 60 x 60 cm (Ezensa) dos 355,000 156,000 171,600
Merk "Granito" -
g. Warna 30 x 30 cm (polos) dos 50,000 50,000 55,000
h. Warna 40 x 40 cm (crem kasar) dos 250,000 250,000 275,000
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
i. Warna 60 x 60 cm (polos) dos 289,300 170,000 187,000
j. Warna 60 x 60 cm (Bintik-bintik kasar warna hitam) dos 413,600 376,000 413,600
Tegel Kasar -
k. Warna 40 x 40 cm, Merk Centro dos 99,000 90,000 99,000
l. Warna 20 x 40 cm, Merk Centro dos 126,500 115,000 126,500
Ubin Teralux -
k. Ukuran 40 x 40 cm, dos 65,000 71,500
l. Ukuran 30 x 30 cm, dos 67,000 73,700
m. Marmer Ukuran 40 x 40 cm, dos 286,000 -
n. Marmer Ukuran 60 x 60 cm, dos 400,000 -
o. Batu alam keramik ukuran 30 x 60 cm -
- Drivestone dos 139,000 152,900
- Decastillo dos 208,000 228,800
Dinding -
Merk " KIA " -
a. Putih 20 x 25 cm. dos 50,000 58,000 63,800
b. Warna 20 x 25 cm. dos 55,000 58,000 63,800
d. Warna 25 x 40 cm. dos 77,000 70,000 77,000
f. Warna 25 x 40 (Merk Habitat) dos 77,000 70,000 77,000
-
E. BAHAN KACA -
-
1 Kaca bening t. 3 mm. m² 125,000 85,000 93,500
2 Kaca bening t. 5 mm. m² 150,000 150,000 165,000
3 Kaca bening t. 8 mm. m² 200,000 370,000 407,000
4 Kaca buram t. 3 mm. m² 193,000 212,300
-
-
5 Kaca buram t. 5 mm. m2 250,000 250,000 275,000
6 Kaca Ray band t. 3 mm. m² 200,000 95,000 104,500
7 Kaca Ray band t. 5 mm. m² 320,000 395,000 434,500
8 Glass Block bh 22,000 20,000 22,000
9 Kaca naco tbl. 5 mm lbr 104,000 -
F. BAHAN BESI -
-
1. Bahan Besi a. d. 6 mm. btg 30,000 26,800 29,480
b. d. 8 mm. btg 48,000 45,700 50,270
c. d. 10 mm. btg 65,000 66,800 73,480
d. d. 12 mm. btg 98,000 95,200 104,720
e. d. 13 mm. btg 127,930 116,300 127,930
f. d. 14 mm. btg 140,000 125,800 138,380
g. d. 16 mm. btg 175,000 169,000 185,900
h. d. 19 mm. btg 285,000 255,500 281,050
i. d. 22 mm. btg 485,000 319,000 350,900
j. ...... . kg -
k. Baja kg -
2. Paku a. Biasa (besar). kg 20,000 18,000 19,800
b. Biasa (kecil/ tripleks). kg 20,000 18,000 19,800
c. Payung RRT/ Seng Kecil. kg 30,000 50,000 55,000
d. Seng (besar). kg 50,000 22,000 24,200
e. Skrup 2 " (isi 100 bj/Dos) dos 75,000 50,000 55,000
f. Beton (3 - 5 cm) dos 15,500 18,000 19,800
g. Paku Gypsum (2 cm) kg 45,000 25,000 27,500
h. Fisher Dinabold kg -
3. Kawat a. Beton (bendrat) roll 24,800 17,500 19,250
b. Beton (bendrat) kg 21,560 19,600 21,560
c. Harmonika m² 35,000 17,500 19,250
d. Nyamuk m² 35,000 13,000 14,300
e. Ayakan kecil m² 25,000 31,250 34,375
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
f. Duri ( 90 m¹ ) roll 181,500 165,000 181,500
g. Kawat Las kg 135,000 -
4. Besi Plat a. t. 2 mm = 120 x 240 cm. lbr 587,000 475,800 523,380
b. t. 3 mm = 120 x 240 cm. lbr 853,000 657,600 723,360
c. t. 10mm = 120 x 240 cm. lbr 2,460,000 2,200,000 2,420,000
.. ...... . kg -
5. Besi Strip a. 30x3 mm btg 45,000 95,000 104,500
b. 30x3 mm (Non SNI) btg 104,500 95,000 104,500
b. 40x4 mm btg 132,000 120,000 132,000
c. 70x6 mm btg 231,000 210,000 231,000
6. Besi Siku : a. 30.30.3 btg 70,000 31,400 34,540
b. 40.40.4 btg 135,000 47,100 51,810
c. 50.50.5 btg 200,000 81,400 89,540
d. 60.60.6 btg 300,000 24,300 26,730
e. 70.70.7 btg 450,000 279,000 306,900
7. Besi Hollow : -
Merk " SKU " a. 2/4 Galvanis profil 0.3 tbl 0.3 mm btg 27,500 25,000 27,500
b. 4/4 Galvanis profil 0.3 tbl 0.3 mm btg 33,000 30,000 33,000
Merk " Aplus " a. Aplus 2/4 tali hitam tbl 0.3 mm/0.35 mm btg 34,000 25,000 27,500
b. Aplus 2/4 tali kuning tbl 0.5 mm/0.6 mm btg 42,000 35,000 38,500
c. Aplus 4/4 tali hitam tbl 0.3 mm/0.35 mm btg 33,000 30,000 33,000
d. Aplus 4/4 tali kuning tbl 0.5 mm/0.6 mm btg 49,500 45,000 49,500
8. Besi WF, C, I, L, O -
- WF ukuran 200 x 100 x 5.5 x 8 (12 meter) btg 2,604,000 2,604,000 2,864,400
- WF ukuran 250 x 125 x 6 x 9 (12 meter) btg 5,475,580 4,977,800 5,475,580
- WF ukuran 350 X 175 x 7 x 11350 (12 meter) btg 9,303,580 8,457,800 9,303,580
- WF ukuran 400 x 200 x 8 x 13 (12 meter) btg 13,860,000 13,860,000 15,246,000
- WF ukuran 450 x 200 x 9 x 14 (12 meter) btg 14,255,560 12,959,600 14,255,560
- C ukuran 150 X 150 btg 357,500 325,000 357,500
- C ukuran 125 x 125 btg 325,050 295,500 325,050
- Harga Per KG kg -
G. BAHAN PIPA -
-
1. Pipa Besi GIP ( Medium A / Super) -
a. Ø 1,5 " - 6 m. btg 130,000 300,000 330,000
b. Ø 2 " - 6 m. btg 303,000 360,000 396,000
c. Ø 2,5 " - 6 m. btg 470,000 490,000 539,000
d. Ø 3 " - 6 m. btg 575,000 600,000 660,000
d. Ø 6 " - 6 m. btg 1,860,000 1,860,000 2,046,000
2. Pipa Besi GIP ( Medium B ) -
a. Ø 1/2 " - 6 m. btg 99,000 -
b. Ø 3/4 " - 6 m. btg 115,000 -
-
-
c. Ø 1 " - 6 m. btg 172,000 -
d. Ø 2 " - 6 m. btg 277,000 -
e. Ø 3 " - 6 m. btg 523,000 -
3. Pipa Paralon PVC -
a. Ø 1/2 " - 4 m. (AW) btg 30,000 17,000 18,700
b. Ø 3/4 " - 4 m. (Maspion). btg 38,000 22,000 24,200
c. Ø 1 " - 4 m. (AW) btg 45,000 41,000 45,100
d. Ø 1 1/2 " - 4 m.(AW). btg 71,500 65,000 71,500
e. Ø 2 " - 4 m. btg 60,000 85,000 93,500
f. Ø 2,5 " - 4 m. btg 78,000 95,000 104,500
g. Ø 3 " - 4 m. btg 87,000 125,000 137,500
h. Ø 4 " - 4 m. btg 137,000 225,000 247,500
i. Ø 5 " - 4 m. btg 221,000 -
j. Ø 6 " - 4 m. btg 292,000 -
k. Ø 8 " - 4 m. btg 513,000 -
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
4. Pipa Jenis Batang C Untuk Instalasi -
Listrik. -
a. Ø 5/8 " - 4 m. btg 12,500 10,000 11,000
b. Ø 3/4 " - 4 m. btg 26,500 -
5. Lem Pipa klg 10,000 37,000 40,700
tube -
H. BAHAN LANGIT-LANGIT -
-
1. Eternit 100 x 100 cm. lbr -
2. Tripleks : - 122 x 244 x 0,20 cm. lbr 50,000 55,000 60,500
- 122 x 244 x 0,30 cm. lbr 53,500 49,000 53,900
- 122 x 244 x 0,40 cm. lbr 65,000 66,000 72,600
- 122 x 244 x 0,60 cm. lbr 72,000 86,000 94,600
- 122 x 244 x 0,90 cm. lbr 90,000 135,000 148,500
3. Tripleks Melamin 122 x 244 x 0,30 cm. lbr 112,000 123,200
4. Multipleks t. 9 mm. lbr 130,000 135,000 148,500
5. Multipleks t. 18 mm. lbr 166,000 250,000 275,000
9. Teak wood lbr 84,000 132,000 145,200
10. Gypsum (9 mm) lbr 66,000 60,000 66,000
11. Kalsiboard (4 mm) lbr 77,700 65,000 71,500
12. Kalsiboard (6 mm) lbr 135,000 148,500
-
I. BAHAN ATAP -
-
1. Genteng : - Beton bh 18,000 15,000 16,500
- Keramik bh 10,000 20,000 22,000
- Asbes lbr 46,700 51,370
- Hardflex 115x85x0,5cm. lbr 32,500 35,750
- Methal Sakura roof m² 38,500 35,000 38,500
- Methal Multi Roof lbr 88,000 95,000 104,500
2. Asbes Gelombang feet -
-
3. Seng Gelombang : -
- BWG 33" BJLS 0.22 mm m¹ 19,500 48,000 52,800
- BWG 28" BJLS 0.35 mm m¹ 42,600 -
4. Seng Plat : - BJLS 0.30 mm lbr 58,000 49,000 53,900
- BJLS 0.35 mm lbr 61,000 -
5. Seng Super Deck : -
- Lebar efektif = 0,76 m, panjang 1,00 m m¹ 62,700 57,000 62,700
-
6. Atap Aluminium Gelombang : -
- AZ150 - 0,40 mm TCT m¹ 120,000 110,000 121,000
-
7. - Atap Onduline lbr 90,000 161,000 177,100
- Atap Fiber Glass Gel. (Transparan) feet 22,000 20,000 22,000
9. Nok/ Bubungan : -
a. Genteng Beton bh 18,000 30,000 33,000
b. Genteng Asbes bh 95,000 104,500
c. Genteng Keramik bh 25,000 35,000 38,500
d. Aluminium SWG 28" - 180 cm. lbr -
e. Spanroof lbr 45,000 48,000 52,800
f. Genteng Metal lbr 45,000 35,000 38,500
10. Nok Steel Gelombang : -
a. Super 180 cm. bh 37,500 41,250
b. Mini 105 cm bh 21,900 24,090
-
-
c. Ekonomi 95 cm. bh -
11. Nok Steel Rata : -
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
a. Super 180 cm. bh 45,000 55,000 60,500
b. Mini 105 cm bh 55,000 -
c. Ekonomi 95 cm. bh 65,000 -
12. Nok 1/2 (setengah) Lingkaran bh 42,000 46,200
13. Karet Pelapis Genteng roll 290,000 319,000
14. Talang Kawat -
a. Lebar 45 m¹ 10,000 11,000
b. Lebar 90 m¹ 20,000 22,000
c. Lebar 110 m¹ 25,000 27,500
-
J. BAHAN PENGGANTUNG -
-
1. Kunci Tanam -
a. Union 1 (satu) Slagh. bh 80,000 175,000 192,500
b. Union 2 (dua) Slagh. bh 150,000 300,000 330,000
c. Yale 1 (satu) Kodai. bh 200,000 300,000 330,000
d. Yale 2 (dua) Slagh. bh 250,000 300,000 330,000
e. Kuda Terbang bh 95,000 104,500
2. Penggantung : -
a. Hak angin kecil psg 25,000 7,500 8,250
b. Hak angin besar psg 35,000 7,500 8,250
c. Grendel kecil bh 8,000 13,000 14,300
d. Grendel besar bh 30,000 13,500 14,850
e. Engsel pintu bh 35,000 50,000 55,000
f. Engsel jendela bh 25,000 32,500 35,750
3. Segel -
a. 15 mm bj 5,000 5,500
b. 10 mm bj 6,000 6,600
c. 5/8 bj 15,000 16,500
d. 3/4 bj 25,000 27,500
4. Roda Putar -
a. 7 cm bj 57,200 52,000 57,200
b. 10 cm bj 110,000 100,000 110,000
5 Sok (AW) -
a. 1/2 bj 1,650 1,500 1,650
b. 3/4 bj 1,650 1,500 1,650
c. 1 bj 2,200 2,000 2,200
d. 1 1/5 bj 2,200 2,000 2,200
e. 2 bj 2,750 2,500 2,750
f. 2,5 bj 3,300 3,000 3,300
g. 3 bj 4,400 4,000 4,400
h. 4 bj 7,700 7,000 7,700
6. Sok (Keny) -
a. 1/2 bj 1,650 1,500 1,650
b. 3/4 bj 1,650 1,500 1,650
c. 1 bj 2,750 2,500 2,750
d. 1 1/5 bj 2,750 2,500 2,750
e. 2 bj 3,300 3,000 3,300
f. 2,5 bj 6,050 5,500 6,050
g. 3 bj 7,700 7,000 7,700
h. 4 bj 15,400 14,000 15,400
-
K. BAHAN SANITAIR -
-
1 Kloset duduk warna (TOTO) bh 2,700,000 2,600,000 2,860,000
2 Kloset duduk putih (TOTO) bh 2,600,000 2,300,000 2,530,000
3 Kloset duduk Merk American Standard bh 1,500,000 1,500,000 1,650,000
4 Kloset jongkok warna (TOTO) bh 285,000 365,000 401,500
5 Kloset jongkok putih (TOTO) bh 250,000 315,000 346,500
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
6 Wastafel warna bh 643,500 600,000 660,000
7 Wastafel putih bh 650,000 275,000 302,500
8 Wastafel cuci piring logam bh 225,000 1,500,000 1,650,000
9 Pompa tangan terpasang bh -
10 Urinoir bh 1,750,000 1,150,000 1,265,000
11 Bak mandi fiber bh 225,000 350,000 385,000
12 Reservoir fiber = 1 M3. bh 1,200,000 1,250,000 1,375,000
13 Reservoir fiber = 2 M3. bh 3,100,000 2,600,000 2,860,000
14 Stop kran 3/4 bh 40,000 -
Floor drain bh 414,000 -
-
15 Kran air bh 50,000 37,000 40,700
16 Kloset jongkok Teraso bh 285,000 -
17 Mesin Pompa Air - Shimizu 3/4" bh 3,410,000 3,100,000 3,410,000
- Sanyo bh 1,350,000 1,485,000
-
L. BAHAN CAT -
-
1. Cat Tembok : -
a. Avitex kg 25,000 27,500
b. Metrolite kg 36,667 33,333 36,667
c. Vinilex Nippon Paint kg 46,000 -
d. Dulux interior kg 65,000 -
e. Dulux eksterior kg 114,800 102,800 113,080
f. Aries kg 9,400 10,340
g. Mowilex eksterior -
- Mix (campur) -
Terendah kg 61,000 67,100
Tertinggi kg 94,000 48,000 52,800
- Ready (siap) kg 54,000 59,400
h. Mowilex interior -
- Mix (campur) -
Terendah kg 38,000 41,800
Tertinggi kg 56,000 58,000 63,800
- Ready (siap) Standar kg 34,000 37,400
- Ready (siap) VIP kg 38,500 42,350
- Ready (siap) Pastel kg 37,500 41,250
i. Aquaproof kg 48,250 36,750 40,425
j. Nodroop kg 44,250 34,000 37,400
2. Cat Kayu : -
a. Dulux kg 85,000 74,000 81,400
b. Avian kg 56,000 27,000 29,700
c. ICI kg 27,400 -
d. Politur kg 63,000 -
e. Menie kg 35,000 23,143 25,457
3. Cat Atap -
a. AGA 5 kg klg 298,000 66,000 72,600
b. Lem Seng m¹ 15,000 16,500
c. Plamur kg 23,900 8,500 9,350
d. Amplas/ Kertas Gosok lbr 7,000 7,700
e. Dempul kg 36,600 32,500 35,750
f. Residu kg/ltr 11,500 -
4 Kuas -
a. Kuas Roll bh 19,000 15,000 16,500
b. Kuas kapal bh 17,500 19,250
c. Kuas biasa ukr. 4 " bh 18,000 17,500 19,250
d. Kuas biasa ukr. 3.5 " bh 10,000 11,000
e. Kuas biasa ukr. 3 " bh 13,000 10,000 11,000
f. Kuas biasa ukr. 2 " bh 10,000 6,500 7,150
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
g. Kuas biasa ukr. 1 " bh 5,000 5,500
h. Kuas lukis (pensil) bh 5,000 5,500
-
M. BAHAN INSTALASI LISTRIK -
-
1. Pipa Union untuk kabel : -
a. 5/8 " - 4 m'. btg 12,500 6,000 6,600
b. 1/2" - 4 m' btg 30,000 15,000 16,500
c. 1" - 4 m' btg 45,000 28,000 30,800
d. 1,5 - m' btg 180,000 198,000
e. 2" - 4 m' btg 60,000 -
2. Knie Union : -
a. 5/8 " bh 15,000 16,500
b. T.Dos bh 4,000 4,400
c. 1/2" btg 2,700 -
d. 1" btg 6,300 -
e. 1,5 " btg 25,000 27,500
f. 2" btg 27,000 -
3. Kabel Listrik : -
a. Type NYA -
- 1,5 mm. m¹ 2,500 1,850 2,035
- 2,5 mm. m¹ 5,000 2,900 3,190
-
-
b. Type NYY -
- 4 x 4 mm. m¹ 28,500 31,350
- 4 x 6 mm. m¹ 37,000 35,000 38,500
- 4 x 10 mm. m¹ 68,700 62,500 68,750
c. Type NYMhy -
- 2 x 1,5 mm. m¹ 6,300 6,500 7,150
- 3 x 2,5 mm. m¹ 15,000 16,500
d. NYM -
- 3 x 2,5 mm. m¹ 13,200 12,000 13,200
- 4 x 2,5 mm. m¹ 16,500 15,000 16,500
- 3 x 4 mm. m¹ 21,450 19,500 21,450
- 4 x 4 mm. m¹ 25,300 23,000 25,300
e. NYFGBY -
- 4 x 4 mm. m¹ -
- 4 x 6 mm. m¹ 65,000 -
- 4 x 10 mm. m¹ 94,000 -
- 4 x 16 mm. m¹ 125,000 -
- 4 x 25 mm. m¹ 325,000 357,500
4. Lampu TL : -
a. 1 x 20 Watt. set 99,000 90,000 99,000
b. 2 x 20 Watt. set 148,500 135,000 148,500
c. 1 x 40 Watt. set 110,000 100,000 110,000
d. 2 x 40 Watt. set 203,500 185,000 203,500
5. Lampu Pijar : -
a. 25 Watt. bh 41,000 5,000 5,500
b. 40 Watt. bh 158,000 5,000 5,500
c. 60 Watt. bh 298,000 5,000 5,500
d. 100 Watt bh 135,000 148,500
e. Lampu Taman 80 W Mercury + Trafo + kaca bh 280,000 308,000
6. Lampu Mercury : -
a. HPL 250 Watt. bh 71,500 65,000 71,500
b. HPL 350 Watt. bh 300,000 330,000
c. Son-H 220 Watt. bh 400,000 440,000
d. Son-H 350 Watt. bh 500,000 550,000
7. Saklar Phase : -
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
a. Tunggal Putih (Broco) bh 11,500 13,000 14,300
b. Tunggal Hitam (Broco) bh 26,000 25,000 27,500
c. Double Putih (Broco) bh 22,000 20,000 22,000
d. Double Hitam (Broco) bh 40,700 37,000 40,700
8. Stop Kontak : -
a. Hitam (Broco) bh 13,500 13,000 14,300
b. Putih (Broco) bh 33,000 24,000 26,400
9. a. Zekring Kast Lokal Biasa bh 47,300 43,000 47,300
b. Lokal 2 Group Automat bh 11,000 10,000 11,000
c. Lokal 3 Group Biasa bh 22,000 20,000 22,000
10. Fitting bh 11,000 10,000 11,000
11. Ekshaus : - Plafond bh 324,500 295,000 324,500
- Tembok bh 385,000 350,000 385,000
-
N. BAHAN BBM, MINYAK DAN PELUMAS -
-
1 Thiner ltr 60,000 30,000 33,000
1 Cat Epoxy ltr -
2 Minyak Cat ltr 12,000 30,000 33,000
3 Bensin (Subsidi) ltr 6,900 6,450 7,095
4 Solar ltr 9,300 10,800 11,880
5 Minyak Bakar ltr 15,000 -
6 Olie / Pelumas -
- Mesin Meditran SX Plus 15W - 40 ltr -
- Meditran S 40 ltr 40,700 37,000 40,700
- Masri 150 FLG ltr 38,400 42,240
- Rimula R4X 15W-40 Diesel Engine ltr 44,500 48,950
- Rimula R2 10 W Diesel Engine ltr 40,500 44,550
- Tellus S2 M 68 Hydraulic ltr 33,660 37,026
- Tellus S2 M 46 Hydraulic ltr 40,500 44,550
- Tellus S2 M 32 Hydraulic ltr 40,500 44,550
- Omala S2 G 150 Gear and Bearing ltr 40,500 44,550
- Spirax S4 ATF HDX Transmisi ltr 46,500 51,150
- Spirax S2 G 90 Gear Oils ltr 61,800 67,980
- Spirax S4 TXM Brake & Clutch Fluids ltr 37,700 41,470
52,500 57,750
-
- Gadus S2 V220 2 Greases kg 61,300 67,430
- Spirax S2 A 85W -140 Gear Oils ltr 45,300 49,830
- Rimula R2 50 Diesel Engine Oils ltr 38,100 41,910
- Oli Spirax G90 (Oli Gardan) Shell ltr 37,700 41,470
7 Oksigen @ 50 kg tabung -
8 Minyak Bekisting ltr 50,100 -
9 Grease / Fet. kg -
10 LPG (15 kg) tabung -
-
O. BAHAN ASPAL -
-
1 Bitumen Asphal kg 14,900 -
2 Asphal Coating kg 13,600 -
3 LATASAG kg 27,000 29,700
4 LATASBUSIR kg 27,000 29,700
5 LASBUTAG ton 850,000 935,000
6 ATB ton 1,215,500 1,337,050
7 Laston ton 1,490,000 -
8 Lataston (HRS) ton 1,557,270 1,712,997
9 Latasir ton 858,000 943,800
10 Butas ton 858,000 943,800
-
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
P. BAHAN LAIN-LAIN -
-
1 Kayu Bakar m³ 52,300 -
2 Air m³ 22,500 24,750
3 Amplas lbr 11,000 10,000 11,000
4 Lem Fox klg 28,000 15,000 16,500
5 Lem Kaca btl 40,000 44,000
6 Wall Paper m² 77,000 70,000 77,000
7 Karet List Kaca m¹ 17,000 18,700
8 Profil Aluminium m¹ 135,000 135,000 148,500
9 Bahan Additive kg 70,000 77,000
10 Rangka Hollow 1 x 2 m² 95,000 95,000 104,500
11 Aluminium untuk Rangka Grill m¹ 65,000 71,500
12 Aluminium untuk Grill m¹ 45,000 49,500
13 Glass Wool m² 250,000 275,000
14 Aluminium Plat m² 605,000 550,000 605,000
15 Rambu Lalu-lintas ukuran standar + tiang. bh -
16 Pintu fiber bh 495,000 450,000 495,000
17 Door closer bh 250,000 200,000 220,000
18 Pintu besi / pintu aluminium m² 1,650,000 1,500,000 1,650,000
19 Jendela besi m² 550,000 550,000 605,000
20 Pintu besi baja m² 800,000 800,000 880,000
21 Horizontal/vertical blinds m² 130,000 143,000
22 Karpet merk Monaco, tinggi = 4 m m² 225,000 247,500
23 Karpet merk New Avalon, tinggi = 4 m m² 175,000 192,500
-
Q. UPAH KERJA -
-
1 Pekerja Terampil org/hr 118,000 85,000 93,500
Pekerja Tidak Terampil org/hr 75,000 82,500
2 Pekerja Kebersihan/ Cleaning Service. org/hr 75,000 82,500
3 Tukang : -
a. Tukang Kayu org/hr 138,000 120,000 132,000
b. Tukang Batu/ Asphal. org/hr 138,000 120,000 132,000
c. Tukang Cat org/hr 138,000 120,000 132,000
d. Tukang Listrik org/hr 138,000 120,000 132,000
e. Tukang Pipa org/hr 138,000 120,000 132,000
f. Tukang Besi org/hr 138,000 120,000 132,000
g. Tukang Las org/hr 138,000 120,000 132,000
h. Tukang Pancang org/hr 138,000 120,000 132,000
i. Tukang Foto org/hr 138,000 120,000 132,000
-
4 Kepala Tukang : -
a. Kayu dan Las. org/hr 143,000 150,000 165,000
b. Batu, Cat, Listrik, Pipa dan Besi org/hr 143,000 150,000 165,000
5 Mandor org/hr 163,000 150,000 165,000
6 Mandor Kebersihan/ Cleaning Service. org/hr 90,000 99,000
7 Pembantu Masinis/Operator org/hr 85,000 93,500
8 Masinis/Operator org/hr 120,000 132,000
-
-
9 Penjaga Gudang org/hr 80,000 88,000
10 Penjaga Malam org/hr 80,000 88,000
-
R. SEWA ALAT -
-
1 Buldozer hr (8 Jam) 4,000,000 4,400,000
2 Shovel hr (8 Jam) 4,000,000 4,400,000
3 Wheel Loader hr (8 Jam) 3,750,000 4,125,000
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
4 Grader hr (8 Jam) 4,100,000 4,510,000
5 Excavator hr (8 Jam) 4,000,000 4,400,000
6 Three Wheel Roller (Walls) hr (8 Jam) 3,500,000 3,850,000
7 Tired Roller hr (8 Jam) 4,500,000 4,950,000
8 Tandem Roller hr (8 Jam) 3,600,000 3,960,000
9 Vibrator Roller hr (8 Jam) 3,750,000 4,125,000
10 Baby Roller hr (8 Jam) 3,000,000 3,300,000
11 Asphal Finisher hr (8 Jam) 2,500,000 2,750,000
12 Asphal Sprayer. hr (8 Jam) 2,500,000 2,750,000
13 Compressor hr (8 Jam) 950,000 1,045,000
14 Truck hr (8 Jam) 950,000 1,045,000
15 Crawler Crane 100 ton hr (8 Jam) 15,000,000 16,500,000
16 Crawler Crane 50 ton hr (8 Jam) 13,000,000 14,300,000
17 Crawler Crane 35 ton hr (8 Jam) 6,500,000 7,150,000
18 Tangki Air hr (8 Jam) 2,500,000 2,750,000
19 Mesin Las listrik hr (8 Jam) 1,000,000 1,000,000 1,100,000
20 Mesin Las Karbit hr (8 Jam) 2,000,000 2,200,000
21 Molen hr (8 Jam) 750,000 825,000
22 Bar Cutter hr (8 Jam) 450,000 495,000
23 Bar Binder hr (8 Jam) 500,000 550,000
24 Jack Hammer hr (8 Jam) 1,300,000 1,430,000
25 Stamper hr (8 Jam) 2,500,000 2,750,000
26 Vibrator beton 4 hp. hr (8 Jam) 300,000 330,000
27 Pompa air 50 mm - 30 m3/jam. hr (8 Jam) 350,000 385,000
28 Ponton service 120 feet hr (8 Jam) 4,600,000 5,060,000
29 Ponton 180 feet + winch + anchor hr (8 Jam) 14,800,000 16,280,000
Ponton service << 100 feet hr (8 Jam) 800,000 880,000
27 Genset hr (8 Jam) 1,500,000 1,650,000
28 Alat bantu hr (8 Jam) 150,000 165,000
29 Loader Breaker hr (8 Jam) 6,000,000 6,600,000
30 Trader hr (8 Jam) 1,000,000 1,100,000
31 Deisel Hammer (Inc. Ladder) hr (8 Jam) 6,000,000 6,600,000
32 Crane on track hr (8 Jam) 2,500,000 2,750,000
33 Pile Driver hr (8 Jam) 1,500,000 1,650,000
34 Concrete pump hr (8 Jam) 5,200,000 5,720,000
35 Casing hr (8 Jam) 250,000 275,000
36 Bore Pile hr (8 Jam) 1,000,000 1,100,000
37 Mesin Bor hr (8 Jam) 150,000 165,000
38 Sewa Theodolit hr (8 Jam) 75,000 82,500
39 Sewa Waterpass hr (8 Jam) 25,000 27,500
37 Tug Boat 320 HP hr (8 Jam) 1,000,000 1,100,000
37 Trailer hr (8 Jam) 1,000,000 1,100,000
-
S. BAHAN ALAT APUNG DAN ALAT DARAT -
-
1 Accu 12 volt - 120 Ah merk. GS (Gold Star) bh 2,915,000 2,650,000 2,915,000
2 Accu 12 volt - 200 Ah merk. GS (Gold Star) bh 3,800,000 3,800,000 4,180,000
3 Ban Luar 8.25-15 14 PR Gajah Tunggal bh 2,400,000 2,400,000 2,640,000
4 Ban Luar 7.50 - 16 14 PR bh 2,100,000 2,100,000 2,310,000
5 Ban Luar 1800 - 25 (Advance) bh 42,500,000 42,500,000 46,750,000
6 Ban Dalam 8.25 - 15 bh 337,500 337,500 371,250
7 Rantai 5/8 m¹ -
8 Rantai 3/4 m¹ -
9 Long Life Chain & Cable Grease - Omega 71 kg 601,700 601,700 661,870
10 Water Proof Open Gear Grease - Omega 73 kg 695,200 695,200 764,720
11 Superior Air Compressor Oil - Omega 613 kg 391,600 391,600 430,760
12 Super Diesel Additive - Omega 903 ltr 512,600 512,600 563,860
13 Industrial Oil Concentrate - Omega 904 ltr 482,900 482,900 531,190
14 Super Engine Oil Additve - Omega 909 ltr 537,900 537,900 591,690
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
15 Special Radiator Treatment Additive - Omega 906 ltr 544,500 544,500 598,950
16 Seal Saver - Omega 917 ltr 2,187,100 2,187,100 2,405,810
17 Sweeper Main Brom bh 10,545,000 10,545,000 11,599,500
-
-
18 Side / Front Brush bh 3,995,000 3,995,000 4,394,500
19 Side Gasket bh 3,590,000 3,590,000 3,949,000
20 Fuel Filter iR-0755 CAT bh 1,020,000 1,020,000 1,122,000
21 Majun / kain lap (karung @ 50 kg) kg 22,000 22,000 24,200
22 Minyak Rem Dot 3 btl 95,000 95,000 104,500
23 Oli Filter 1R - 1808 CAT bh 668,100 668,100 734,910
24 Filter Water Separator (PN.8159975) Volvo bh 1,147,000 1,147,000 1,261,700
25 Filter Water Separator (PN.316-9954) CAT bh 985,400 985,400 1,083,940
26 Filter Oli By Pass (PN. 21707132) Volvo bh 501,000 501,000 551,100
27 Fuel Filter (PN. 8193841) Volvo bh 530,000 530,000 583,000
28 Filter Oli (PN. 466634) Volvo bh 450,000 450,000 495,000
29 Filter Oli Mesin (PN.32B4020100) Mitsubishi bh 300,000 300,000 330,000
30 Fuel Filter PN 3959612 merk Cummins bh 480,000 480,000 528,000
31 Oil Filter PN 3937743 merk Cummins bh 650,000 650,000 715,000
32 Filter element oli mesin Hyundai bh 650,000 650,000 715,000
33 Air Filter PN 039705 merk Westerbeke bh 415,000 415,000 456,500
34 Oil Filter PN 036918 merk Westerbeke bh -
35 V-Belt Ribbed PN 4943125 merk Cummins bh -
36 V-Belt Ribbed PN 4981117 merk Cummins bh -
37 Cat Intertuf 262 Red ltr 540,000 540,000 594,000
38 Interthane 990 Signal Blue ltr 515,000 515,000 566,500
39 Interthane 990 Signal Green ltr 515,000 515,000 566,500
40 Interthane 990 White ltr 515,000 515,000 566,500
41 Intertherm 891 Alumunium ltr 515,000 515,000 566,500
42 Interlac 665 White ltr 515,000 515,000 566,500
43 Interlac 665 Black ltr 515,000 515,000 566,500
44 Interlac 665 Caribbean Blue ltr 515,000 515,000 566,500
45 Interlac 665 Signal Blue ltr 515,000 515,000 566,500
46 Interlac 665 Signal Green ltr 515,000 515,000 566,500
47 Thinner GTA 713/GTA 733 ltr 315,000.00 315,000 346,500
48 Thinner GTA-004 ltr 315,000.00 315,000 346,500
-
T. BAHAN ATK (ALAT TULIS & KANTOR) -
-
1 Amplop 110 x 230 pak -
2 Balpoin Snowman XI pak -
3 Balpoin Faster pak -
4 Balpoin Balliner ktk -
5 Baterai Eveready (Kecil) bh -
6 Baterai Remote AC bh -
7 Buku register Kiky (Folio) bh -
8 Buku Ekspedisi Folio (Besar) @ 100 lbr bh -
9 Buku Ekspedisi 1/2 Folio bh -
10 Buku Tabelaris 16 kolom bh -
11 Buku Kwitansi bh -
12 Bolder File Bantex bh -
13 Binder file 888 bh -
14 Binder Clips (Kecil) dos -
15 Binder Clips (Sedang) dos -
16 Binder Clips (Besar) bh -
17 Kalkulator besar 8 digit (Casio) bh -
18 Kalkulator kecil MJ (Casio) bh -
19 Kalkulator besar 12 digit (Citizen)) bh -
20 Kalkulator kecil (Citizen)) bh -
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
21 Clipper dos -
22 Cutter L-500 (Kenko) bh -
23 Carbon folio (Daito) (isi 100 sheet) bh -
24 Flash disk 16 GB (Kingston) bh -
25 Flash disk 8 GB (Kingston) bh -
26 Flash disk 4 GB (Kingston) bh -
27 Flash disk 2 GB (Kingston) bh -
28 File box bh -
29 Gunting (Sedang) bh -
30 Gunting Besar bh -
31 Hard Disk 500 GB bh -
32 Hekter (Kecil) bh -
33 Hekter (Besar) bh -
34 Isi cutter (Kenko) dos -
35 Isi hekter (isi 20 dos kecil) dos -
36 Isi staples (Kecil) dos -
-
-
37 Isi staples (Besar) dos -
38 Isolasi Roll besar 1x72 bh -
39 Karton dosir folio bh -
40 Kertas Karbon Daito pak -
41 Kertas fax bh -
42 Kertas foto lbr -
43 Kertas HVS 70 gram (kwarto) rim -
44 Kertas HVS 80 gram (kwarto) rim -
45 Kertas HVS 80 gram (folio ) rim 400 440
46 Kertas Continous Form 2 Ply box -
47 Kertas Continous Form 4 Ply box -
48 Kertas Continous Form 5 Ply box -
49 Lem agung kertas (Besar) bh -
50 Lem agung kertas (Kecil) bh -
51 Lakban Hitam bh -
52 Map lipat (Stop map) bh -
53 Map Spring file 305 bh -
54 Map Ordner plastik bh -
55 Map Snelhecter (plastik) folio bh -
56 Mistar besi 30 cm bh -
57 Map plastik bh -
58 Map bening bh -
59 Map karton bh -
60 Pita mesin ketik (Daito) bh -
61 Pelubang kertas (Besar) bh -
62 Pelubang kertas (Kecil) bh -
63 Paper clips besar (Jumbo) (Isi 10 Dos Kecil) dos -
64 Paper clips (Isi 10 Dos Kecil) dos -
65 Penjepit kertas (Besar) bh -
66 Penjepit kertas (Sedang) bh -
67 Penjepit kertas (Kecil) bh -
68 Pulpen Balliner bh -
69 Pita printer Epson LX-300+ bh -
70 Pita printer Epson LX-300+ (refill) bh -
71 Pita printer Epson LX-2180 bh -
72 Pita printer Epson LX 300 bh -
73 Pita Printer Epson LQ 2190 bh -
74 Post It 5 Warna (Sign Here) bh -
75 Refill Kit DP 40 Hitam bh -
76 Re-Type bh -
77 Spidol besar B'Marker bh -
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
78 Spidol kecil bh -
79 Staples (Besar) bh -
80 Staples (Kecil) bh -
81 Talk Powder bh -
82 Tinta cartridge (Black) uk. 40 Canon bh -
83 Tinta cartridge (Black) uk. 27 HP bh -
84 Tinta cartridge (Black) uk. 41 Canon bh -
85 Tinta cartridge (Black) uk. 831 Canon bh -
86 Tinta printer HP laser jet 1020 (Tunner) bh -
87 Tinta printer HP laser jet 1020 (Refill) bh -
88 Tinta printer EPSON L210 btl -
89 Tinta printer yellow CANON 200 ml btl -
90 Tinta printer Cyan CANON 200 ml btl -
91 Tinta printer Canon warna KMHB warna bh -
92 Tinta printer Cyan ERC-38 bh -
93 Tinta stempel warna biru bh -
94 Tinta printer Pixma IP-1880 bh -
95 Tinta printer Pixma MP 145 300 ml btl -
96 Tinta printer Toner 12 A Laser jet 1020 bh -
97 Tinta printer Toner 49 A Laser jet 1020 bh -
98 Tinta Printer L 210 (warna) set 45,000 49,500
99 Tinta EPSON T6641 Black btl -
100 Tinta printer LX 310 Ori bh -
101 Tipp Ex bh -
102 Tinta isi ulang ( Hitam, Merah, Kuning, Biru) btl -
103 Toner Laserjet HP 85 A bh -
104 Toner Laserjet HP 35 A bh -
105 Odner Gobby bh -
106 Ori PG 810 bh -
-
-
107 Ori HP 802 BK bh -
108 Ori HP 802 CL bh -
-
U. BAHAN TIANG PANCANG -
-
1 Tiang Pancang Beton -
- Diamater 30 cm (Bottom Mamira) m¹ -
- Diamater 30 cm (Middle) m¹ -
- Diamater 40 cm (Bottom Mamira) m¹ -
- Diamater 40 cm (Middle) m¹ -
- Diamater 50 cm (Bottom Mamira) m¹ -
- Diamater 50 cm (Middle) m¹ -
- Diamater 60 cm (Bottom Mamira) m¹ -
- Diamater 60 cm (Middle) m¹ -
2 Tiang Pancang Baja -
- Diamater 32,38 cm (12¾") tebal 12 mm m¹ -
- Diamater 40,64 cm (16") tebal 12 mm m¹ -
- Diamater 40,64 cm (16") tebal 14 mm m¹ -
- Diamater 60,96 cm (24") tebal 12 mm m¹ -
- Diamater 60,96 cm (24") tebal 14 mm m¹ -
- Diamater 60,96 cm (24") tebal 16 mm m¹ -
- Diamater 81,28 cm (32") tebal 12 mm m¹ -
- Diamater 81,28 cm (32") tebal 14 mm m¹ -
- Diamater 81,28 cm (32") tebal 16 mm m¹ -
- Diamater 101,6 cm (40") tebal 12 mm m¹ -
- Diamater 101,6 cm (40") tebal 14 mm m¹ -
- Diamater 101,6 cm (40") tebal 16 mm m¹ -
- Diamater 121,9 cm (48") tebal 12 mm m¹ -
HARGA SATUAN

SATUAN SURVEY +
NO. JENIS BAHAN PU SURVEY LAP
PROFIT
(RP.) (RP.) (RP.)
1 2 3 4 5 6
- Diamater 121,9 cm (48") tebal 14 mm m¹ -
- Diamater 121,9 cm (48") tebal 16 mm m¹ -
-
Makassar , Januari 2018

MENYETUJUI MENGETAHUI TIM PENYUSUN HARGA SATUAN UPAH


GENERAL MANAGER MANAGER TEKNIK BAHAN DAN ALAT TAHUN 2018

1. NAJEMUDIN
(KETUA)
ARIS TUNRU ZULFA SAYUTI
2. HERMAJI MIFTAH
(SEKRETARIS)

3. MATHEUS DEMONG
(ANGGOTA)

4. ZULKARNAIN
(ANGGOTA)

5. ROMI DELA ROSA


(ANGGOTA)
BAB III

DAFTAR HARGA SATUAN


BAHAN, UPAH KERJA, SEWA ALAT & ATK
TRIWULAN I TAHUN 2018

HARGA SATUAN SEMESTER I 2019


MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5

A. BAHAN DASAR

atu.
. Kali m³ 220,000 160,000 176,000 220,000
. Gunung/ Belah/ Karang m³ 300,000 160,000 176,000 300,000
Kerikil m³ 250,000 300,000 330,000 250,000
. Pecah : - 7 - 10 Cm. m³ 300,000 300,000 330,000 300,000
- 5-7 Cm. m³ 420,000 420,000 462,000 420,000
- 3-5 Cm. m³ 450,000 275,000 302,500 450,000
- 2-3 Cm. m³ 450,000 275,000 302,500 450,000
- 1-2 Cm. (Split). m³ 260,000 450,000 495,000 260,000
- 0,5 - 1 Cm. (Chiping). m³ 294,300 350,000 385,000 294,000
asir : - Timbunan/ Urug. m³ 84,000 160,000 176,000 84,000
- Pasangan. m³ 165,000 160,000 176,000 165,000
- Beton. m³ 165,000 160,000 176,000 165,000
- Plesteran/ Halus. m³ 200,000 160,000 176,000 200,000
anah. - Timbunan/ Urug. m³ 175,000 85,000 93,500 175,000
- Gembur (Ut.Tanaman). m³ 44,000 44,000 48,400 44,000
asir Batu (Sirtu). m³ 115,600 250,000 275,000 116,000
atu Olahan : - Bata/Merah (kwalitas I) bh 600 500 550 1,000
- Bata/Merah (ukr. 8,5 x 18,5 x 4) bh 600 500 550 1,000
- Paving Block ( Bo ). Lokal m² 66,700 - 67,000
- Paving Block ( K.300 ) Lokal - -
- Tebal 6 cm m² 77,000 - 77,000
- Tebal 8 cm m² 110,500 62,000 68,200 111,000
- Paving Block ( K.400 ) Lokal tebal=10cm m² 129,800 98,000 107,800 130,000
- Paving Block ( K.400 ) m² - -
- Roster Kerawang. bh 95,000 104,500 -
- Kansteen Taman m' 55,000 60,500 -
eton Ready Mix : - -
- K-175 m³ 815,000 850,000 935,000 815,000
- K-225 m³ 944,000 860,000 946,000 944,000
- K-250 m³ 963,600 880,000 968,000 964,000
- K-275 m³ 988,000 900,000 990,000 988,000
- K-300 m³ 1,000,000 920,000 1,012,000 1,000,000
- K-350 m³ 1,070,000 960,000 1,056,000 1,070,000
- K-400 m³ 1,120,000 1,020,000 1,122,000 1,120,000
- K-450 m³ 1,180,000 1,060,000 1,166,000 1,180,000
- K-500 m³ 1,235,000 1,100,000 1,210,000 1,235,000
- K-600 m³ - -
- K-800 m³ - -
- K-1000 m³ - -
- K-1200 m³ - -
- K-1500 m³ - -
apur Pasangan. m³ - -
emen (PC). - -
. Tonasa : - 50 Kg. zak 58,000 58,000 63,800 58,000
- 40 Kg. zak 50,000 48,000 52,800 50,000
. Bosowa : - 50 Kg. zak 58,000 63,800 -
- 40 Kg. zak 45,000 46,000 50,600 45,000
Tiga Roda - 50 Kg. zak - -
- 40 Kg. zak 45,000 45,000 49,500 45,000
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
. Semen Putih Tiga Roda zak 45,000 45,000 49,500 45,000
. Semen Warna kg - -
- AM 50 kg 20,000 16,000 17,600 20,000
- AM 53 kg 20,000 16,000 17,600 20,000
Semen mortal kg 15,000 16,500 -
- -
B. BAHAN KAYU - -
- -
ayu Kelas I (satu) - -
. Balok gergaji Sawmil. m³ 9,000,000 8,500,000 9,350,000 9,000,000
. Papan gergaji Sawmil. m³ 15,000,000 14,000,000 15,400,000 15,000,000
ayu Kelas II (dua) - -
. Balok. m³ 3,250,000 3,000,000 3,300,000 3,250,000
- -
- -
. Papan. m³ 3,750,000 3,000,000 3,300,000 3,750,000
List Profil 2 x 3 cm. m¹ 36,600 36,600 40,260 37,000
. List Profil 3 x 3 cm. m¹ 71,000 71,000 78,100 71,000
. List Profil 4 x 4 cm. m¹ 31,800 31,800 34,980 32,000
List Profil 4 x 5 cm. m¹ 9,000 9,000 9,900 9,000
ayu Kelas III (tiga) - -
. Balok. m³ 2,085,000 2,000,000 2,200,000 2,085,000
. Papan. m³ 2,182,000 2,000,000 2,200,000 2,182,000
ayu Sungkai m² 115,000 126,500 -
- -
C. BAHAN BAMBU - -
. Besar btg 40,000 30,000 33,000 40,000
. Sedang btg 30,000 25,000 27,500 30,000
Kecil btg 25,000 20,000 22,000 25,000
- -
D. BAHAN LANTAI - -
- -
egel PC : - -
. PC abu-abu 20 x 20 cm. dos 48,000 58,000 63,800 48,000
. PC abu-abu 30 x 30 cm. dos 49,700 48,500 53,350 50,000
PC abu-abu 40 x 40 cm. dos 107,000 50,000 55,000 107,000
. PC warna 20 x 20 cm. dos 88,000 48,000 52,800 88,000
. PC warna 30 x 30 cm. dos 53,000 48,500 53,350 53,000
PC warna 40 x 40 cm. dos 58,000 50,000 55,000 58,000
. PC badak 30 x 30 cm. dos 71,500 65,000 71,500 72,000
. PC wafel 20 x 20 cm. dos 60,000 66,000 -
PC wafel 30 x 30 cm. dos 60,000 66,000 -
egel Keramik : - -
antai - -
erk " Roman ". - -
. Warna 20 x 25 cm dos 62,000 68,200 -
. Warna 40 x 40 cm dos 137,500 125,000 137,500 138,000
Warna 50 x 50 cm dos 159,500 145,000 159,500 160,000
. Warna 50 x 50 cm (Merk Habitat) dos 103,000 113,300 -
erk " KIA" - -
. Putih 20 x 20 cm. dos 48,000 48,000 52,800 48,000
. Putih 30 x 30 cm. dos 50,000 48,500 53,350 50,000
Warna 30 x 30 cm. dos 53,000 60,000 66,000 53,000
. Warna 40 x 40 cm. dos 58,000 70,000 77,000 58,000
. Warna 30 x 30 cm (Platinum) dos 88,000 60,000 66,000 88,000
Warna 60 x 60 cm (Ezensa) dos 355,000 156,000 171,600 355,000
erk "Granito" - -
. Warna 30 x 30 cm (polos) dos 50,000 50,000 55,000 50,000
. Warna 40 x 40 cm (crem kasar) dos 250,000 250,000 275,000 250,000
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
Warna 60 x 60 cm (polos) dos 289,300 170,000 187,000 289,000
Warna 60 x 60 cm (Bintik-bintik kasar warna hitam) dos 413,600 376,000 413,600 414,000
egel Kasar - -
Warna 40 x 40 cm, Merk Centro dos 99,000 90,000 99,000 99,000
Warna 20 x 40 cm, Merk Centro dos 126,500 115,000 126,500 127,000
bin Teralux - -
Ukuran 40 x 40 cm, dos 65,000 71,500 -
Ukuran 30 x 30 cm, dos 67,000 73,700 -
m. Marmer Ukuran 40 x 40 cm, dos 286,000 - 286,000
. Marmer Ukuran 60 x 60 cm, dos 400,000 - 400,000
. Batu alam keramik ukuran 30 x 60 cm - -
- Drivestone dos 139,000 152,900 -
- Decastillo dos 208,000 228,800 -
inding - -
erk " KIA " - -
. Putih 20 x 25 cm. dos 50,000 58,000 63,800 50,000
. Warna 20 x 25 cm. dos 55,000 58,000 63,800 55,000
. Warna 25 x 40 cm. dos 77,000 70,000 77,000 77,000
Warna 25 x 40 (Merk Habitat) dos 77,000 70,000 77,000 77,000
- -
E. BAHAN KACA - -
- -
aca bening t. 3 mm. m² 125,000 85,000 93,500 125,000
aca bening t. 5 mm. m² 150,000 150,000 165,000 150,000
aca bening t. 8 mm. m² 200,000 370,000 407,000 200,000
aca buram t. 3 mm. m² 193,000 212,300 -
- -
- -
aca buram t. 5 mm. m2 250,000 250,000 275,000 250,000
aca Ray band t. 3 mm. m² 200,000 95,000 104,500 200,000
aca Ray band t. 5 mm. m² 320,000 395,000 434,500 320,000
lass Block bh 22,000 20,000 22,000 22,000
aca naco tbl. 5 mm lbr 104,000 - 104,000
F. BAHAN BESI - -
- -
ahan Besi a. d. 6 mm. btg 30,000 26,800 29,480 30,000
b. d. 8 mm. btg 48,000 45,700 50,270 48,000
c. d. 10 mm. btg 65,000 66,800 73,480 65,000
d. d. 12 mm. btg 98,000 95,200 104,720 98,000
e. d. 13 mm. btg 127,930 116,300 127,930 128,000
f. d. 14 mm. btg 140,000 125,800 138,380 140,000
g. d. 16 mm. btg 175,000 169,000 185,900 175,000
h. d. 19 mm. btg 285,000 255,500 281,050 285,000
i. d. 22 mm. btg 485,000 319,000 350,900 485,000
j. ...... . kg - -
k. Baja kg - -
aku a. Biasa (besar). kg 20,000 18,000 19,800 20,000
b. Biasa (kecil/ tripleks). kg 20,000 18,000 19,800 20,000
c. Payung RRT/ Seng Kecil. kg 30,000 50,000 55,000 30,000
d. Seng (besar). kg 50,000 22,000 24,200 50,000
e. Skrup 2 " (isi 100 bj/Dos) dos 75,000 50,000 55,000 75,000
f. Beton (3 - 5 cm) dos 15,500 18,000 19,800 16,000
g. Paku Gypsum (2 cm) kg 45,000 25,000 27,500 45,000
h. Fisher Dinabold kg - -
awat a. Beton (bendrat) roll 24,800 17,500 19,250 25,000 1 ro
b. Beton (bendrat) kg 21,560 19,600 21,560 22,000
c. Harmonika m² 35,000 17,500 19,250 35,000
d. Nyamuk m² 35,000 13,000 14,300 35,000
e. Ayakan kecil m² 25,000 31,250 34,375 25,000
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
f. Duri ( 90 m¹ ) roll 181,500 165,000 181,500 182,000
g. Kawat Las kg 135,000 - 135,000
esi Plat a. t. 2 mm = 120 x 240 cm. lbr 587,000 475,800 523,380 587,000
b. t. 3 mm = 120 x 240 cm. lbr 853,000 657,600 723,360 853,000
c. t. 10mm = 120 x 240 cm. lbr 2,460,000 2,200,000 2,420,000 2,460,000
.. ...... . kg - -
esi Strip a. 30x3 mm btg 45,000 95,000 104,500 45,000
b. 30x3 mm (Non SNI) btg 104,500 95,000 104,500 105,000
b. 40x4 mm btg 132,000 120,000 132,000 132,000
c. 70x6 mm btg 231,000 210,000 231,000 231,000
esi Siku : a. 30.30.3 btg 70,000 31,400 34,540 70,000
b. 40.40.4 btg 135,000 47,100 51,810 135,000
c. 50.50.5 btg 200,000 81,400 89,540 200,000
d. 60.60.6 btg 300,000 24,300 26,730 300,000
e. 70.70.7 btg 450,000 279,000 306,900 450,000
esi Hollow : - -
erk " SKU " a. 2/4 Galvanis profil 0.3 tbl 0.3 mm btg 27,500 25,000 27,500 28,000
b. 4/4 Galvanis profil 0.3 tbl 0.3 mm btg 33,000 30,000 33,000 33,000
erk " Aplus " a. Aplus 2/4 tali hitam tbl 0.3 mm/0.35 mm btg 34,000 25,000 27,500 34,000
b. Aplus 2/4 tali kuning tbl 0.5 mm/0.6 mm btg 42,000 35,000 38,500 42,000
c. Aplus 4/4 tali hitam tbl 0.3 mm/0.35 mm btg 33,000 30,000 33,000 33,000
d. Aplus 4/4 tali kuning tbl 0.5 mm/0.6 mm btg 49,500 45,000 49,500 50,000
esi WF, C, I, L, O - -
WF ukuran 200 x 100 x 5.5 x 8 (12 meter) btg 2,604,000 2,604,000 2,864,400 2,604,000
WF ukuran 250 x 125 x 6 x 9 (12 meter) btg 5,475,580 4,977,800 5,475,580 5,476,000
WF ukuran 350 X 175 x 7 x 11350 (12 meter) btg 9,303,580 8,457,800 9,303,580 9,304,000
WF ukuran 400 x 200 x 8 x 13 (12 meter) btg 13,860,000 13,860,000 15,246,000 13,860,000
WF ukuran 450 x 200 x 9 x 14 (12 meter) btg 14,255,560 12,959,600 14,255,560 14,256,000
C ukuran 150 X 150 btg 357,500 325,000 357,500 358,000
C ukuran 125 x 125 btg 325,050 295,500 325,050 325,000
Harga Per KG kg - -
G. BAHAN PIPA - -
- -
pa Besi GIP ( Medium A / Super) - -
. Ø 1,5 " - 6 m. btg 130,000 300,000 330,000 130,000
. Ø 2 " - 6 m. btg 303,000 360,000 396,000 303,000
Ø 2,5 " - 6 m. btg 470,000 490,000 539,000 470,000
. Ø 3 " - 6 m. btg 575,000 600,000 660,000 575,000
. Ø 6 " - 6 m. btg 1,860,000 1,860,000 2,046,000 1,860,000
pa Besi GIP ( Medium B ) - -
. Ø 1/2 " - 6 m. btg 99,000 - 99,000
. Ø 3/4 " - 6 m. btg 115,000 - 115,000
- -
- -
Ø 1 " - 6 m. btg 172,000 - 172,000
. Ø 2 " - 6 m. btg 277,000 - 277,000
. Ø 3 " - 6 m. btg 523,000 - 523,000
pa Paralon PVC - -
. Ø 1/2 " - 4 m. (AW) btg 30,000 17,000 18,700 30,000
. Ø 3/4 " - 4 m. (Maspion). btg 38,000 22,000 24,200 38,000
Ø 1 " - 4 m. (AW) btg 45,000 41,000 45,100 45,000
. Ø 1 1/2 " - 4 m.(AW). btg 71,500 65,000 71,500 72,000
. Ø 2 " - 4 m. btg 60,000 85,000 93,500 60,000
Ø 2,5 " - 4 m. btg 78,000 95,000 104,500 78,000
. Ø 3 " - 4 m. btg 87,000 125,000 137,500 87,000
. Ø 4 " - 4 m. btg 137,000 225,000 247,500 137,000
Ø 5 " - 4 m. btg 221,000 - 221,000
Ø 6 " - 4 m. btg 292,000 - 292,000
Ø 8 " - 4 m. btg 513,000 - 513,000
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
pa Jenis Batang C Untuk Instalasi - -
strik. - -
. Ø 5/8 " - 4 m. btg 12,500 10,000 11,000 13,000
. Ø 3/4 " - 4 m. btg 26,500 - 27,000
em Pipa klg 10,000 37,000 40,700 10,000
tube - -
H. BAHAN LANGIT-LANGIT - -
- -
ternit 100 x 100 cm. lbr - -
ripleks : - 122 x 244 x 0,20 cm. lbr 50,000 55,000 60,500 50,000
- 122 x 244 x 0,30 cm. lbr 53,500 49,000 53,900 54,000
- 122 x 244 x 0,40 cm. lbr 65,000 66,000 72,600 65,000
- 122 x 244 x 0,60 cm. lbr 72,000 86,000 94,600 72,000
- 122 x 244 x 0,90 cm. lbr 90,000 135,000 148,500 90,000
ripleks Melamin 122 x 244 x 0,30 cm. lbr 112,000 123,200 -
ultipleks t. 9 mm. lbr 130,000 135,000 148,500 130,000
ultipleks t. 18 mm. lbr 166,000 250,000 275,000 166,000
eak wood lbr 84,000 132,000 145,200 84,000
ypsum (9 mm) lbr 66,000 60,000 66,000 66,000
alsiboard (4 mm) lbr 77,700 65,000 71,500 78,000
alsiboard (6 mm) lbr 135,000 148,500 -
- -
. BAHAN ATAP - -
- -
enteng : - Beton bh 18,000 15,000 16,500 18,000
- Keramik bh 10,000 20,000 22,000 10,000
- Asbes lbr 46,700 51,370 -
- Hardflex 115x85x0,5cm. lbr 32,500 35,750 -
- Methal Sakura roof m² 38,500 35,000 38,500 39,000
- Methal Multi Roof lbr 88,000 95,000 104,500 88,000
sbes Gelombang feet - -
- -
eng Gelombang : - -
- BWG 33" BJLS 0.22 mm m¹ 19,500 48,000 52,800 20,000
- BWG 28" BJLS 0.35 mm m¹ 42,600 - 43,000
eng Plat : - BJLS 0.30 mm lbr 58,000 49,000 53,900 58,000
- BJLS 0.35 mm lbr 61,000 - 61,000
eng Super Deck : - -
Lebar efektif = 0,76 m, panjang 1,00 m m¹ 62,700 57,000 62,700 63,000
- -
tap Aluminium Gelombang : - -
- AZ150 - 0,40 mm TCT m¹ 120,000 110,000 121,000 120,000
- -
Atap Onduline lbr 90,000 161,000 177,100 90,000
Atap Fiber Glass Gel. (Transparan) feet 22,000 20,000 22,000 22,000
ok/ Bubungan : - -
. Genteng Beton bh 18,000 30,000 33,000 18,000
. Genteng Asbes bh 95,000 104,500 -
Genteng Keramik bh 25,000 35,000 38,500 25,000
. Aluminium SWG 28" - 180 cm. lbr - -
. Spanroof lbr 45,000 48,000 52,800 45,000
Genteng Metal lbr 45,000 35,000 38,500 45,000
ok Steel Gelombang : - -
. Super 180 cm. bh 37,500 41,250 -
. Mini 105 cm bh 21,900 24,090 -
- -
- -
Ekonomi 95 cm. bh - -
ok Steel Rata : - -
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
. Super 180 cm. bh 45,000 55,000 60,500 45,000
. Mini 105 cm bh 55,000 - 55,000
Ekonomi 95 cm. bh 65,000 - 65,000
ok 1/2 (setengah) Lingkaran bh 42,000 46,200 -
aret Pelapis Genteng roll 290,000 319,000 -
alang Kawat - -
. Lebar 45 m¹ 10,000 11,000 -
. Lebar 90 m¹ 20,000 22,000 -
Lebar 110 m¹ 25,000 27,500 -
- -
. BAHAN PENGGANTUNG - -
- -
unci Tanam - -
. Union 1 (satu) Slagh. bh 80,000 175,000 192,500 80,000
. Union 2 (dua) Slagh. bh 150,000 300,000 330,000 150,000
Yale 1 (satu) Kodai. bh 200,000 300,000 330,000 200,000
. Yale 2 (dua) Slagh. bh 250,000 300,000 330,000 250,000
. Kuda Terbang bh 95,000 104,500 -
enggantung : - -
. Hak angin kecil psg 25,000 7,500 8,250 25,000
. Hak angin besar psg 35,000 7,500 8,250 35,000
Grendel kecil bh 8,000 13,000 14,300 8,000
. Grendel besar bh 30,000 13,500 14,850 30,000
. Engsel pintu bh 35,000 50,000 55,000 35,000
Engsel jendela bh 25,000 32,500 35,750 25,000
egel - -
. 15 mm bj 5,000 5,500 -
. 10 mm bj 6,000 6,600 -
5/8 bj 15,000 16,500 -
. 3/4 bj 25,000 27,500 -
oda Putar - -
. 7 cm bj 57,200 52,000 57,200 57,000
. 10 cm bj 110,000 100,000 110,000 110,000
ok (AW) - -
. 1/2 bj 1,650 1,500 1,650 2,000
. 3/4 bj 1,650 1,500 1,650 2,000
1 bj 2,200 2,000 2,200 2,000
. 1 1/5 bj 2,200 2,000 2,200 2,000
. 2 bj 2,750 2,500 2,750 3,000
2,5 bj 3,300 3,000 3,300 3,000
. 3 bj 4,400 4,000 4,400 4,000
. 4 bj 7,700 7,000 7,700 8,000
ok (Keny) - -
. 1/2 bj 1,650 1,500 1,650 2,000
. 3/4 bj 1,650 1,500 1,650 2,000
1 bj 2,750 2,500 2,750 3,000
. 1 1/5 bj 2,750 2,500 2,750 3,000
. 2 bj 3,300 3,000 3,300 3,000
2,5 bj 6,050 5,500 6,050 6,000
. 3 bj 7,700 7,000 7,700 8,000
. 4 bj 15,400 14,000 15,400 15,000
- -
K. BAHAN SANITAIR - -
- -
loset duduk warna (TOTO) bh 2,700,000 2,600,000 2,860,000 2,700,000
loset duduk putih (TOTO) bh 2,600,000 2,300,000 2,530,000 2,600,000
loset duduk Merk American Standard bh 1,500,000 1,500,000 1,650,000 1,500,000
loset jongkok warna (TOTO) bh 285,000 365,000 401,500 285,000
loset jongkok putih (TOTO) bh 250,000 315,000 346,500 250,000
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
Wastafel warna bh 643,500 600,000 660,000 644,000
Wastafel putih bh 650,000 275,000 302,500 650,000
Wastafel cuci piring logam bh 225,000 1,500,000 1,650,000 225,000
ompa tangan terpasang bh - -
rinoir bh 1,750,000 1,150,000 1,265,000 1,750,000
ak mandi fiber bh 225,000 350,000 385,000 225,000
eservoir fiber = 1 M3. bh 1,200,000 1,250,000 1,375,000 1,200,000
eservoir fiber = 2 M3. bh 3,100,000 2,600,000 2,860,000 3,100,000
top kran 3/4 bh 40,000 - 40,000
oor drain bh 414,000 - 414,000
- -
ran air bh 50,000 37,000 40,700 50,000
loset jongkok Teraso bh 285,000 - 285,000
esin Pompa Air - Shimizu 3/4" bh 3,410,000 3,100,000 3,410,000 3,410,000
- Sanyo bh 1,350,000 1,485,000 -
- -
L. BAHAN CAT - -
- -
at Tembok : - -
. Avitex kg 25,000 27,500 -
. Metrolite kg 36,667 33,333 36,667 37,000
Vinilex Nippon Paint kg 46,000 - 46,000
. Dulux interior kg 65,000 - 65,000
. Dulux eksterior kg 114,800 102,800 113,080 115,000
Aries kg 9,400 10,340
. Mowilex eksterior - -
- Mix (campur) - -
Terendah kg 61,000 67,100 -
Tertinggi kg 94,000 48,000 52,800 94,000
- Ready (siap) kg 54,000 59,400 -
. Mowilex interior - -
- Mix (campur) - -
Terendah kg 38,000 41,800 -
Tertinggi kg 56,000 58,000 63,800 56,000
- Ready (siap) Standar kg 34,000 37,400 -
- Ready (siap) VIP kg 38,500 42,350 -
- Ready (siap) Pastel kg 37,500 41,250 -
Aquaproof kg 48,250 36,750 40,425 48,000
Nodroop kg 44,250 34,000 37,400 44,000
at Kayu : - -
. Dulux kg 85,000 74,000 81,400 85,000
. Avian kg 56,000 27,000 29,700 56,000
ICI kg 27,400 - 27,000
. Politur kg 63,000 - 63,000
. Menie kg 35,000 23,143 25,457 35,000
at Atap - -
. AGA 5 kg klg 298,000 66,000 72,600 298,000
. Lem Seng m¹ 15,000 16,500 -
Plamur kg 23,900 8,500 9,350 24,000
. Amplas/ Kertas Gosok lbr 7,000 7,700 -
. Dempul kg 36,600 32,500 35,750 37,000
Residu kg/ltr 11,500 - 12,000
uas - -
. Kuas Roll bh 19,000 15,000 16,500 19,000
. Kuas kapal bh 17,500 19,250 -
Kuas biasa ukr. 4 " bh 18,000 17,500 19,250 18,000
. Kuas biasa ukr. 3.5 " bh 10,000 11,000 -
. Kuas biasa ukr. 3 " bh 13,000 10,000 11,000 13,000
Kuas biasa ukr. 2 " bh 10,000 6,500 7,150 10,000
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
. Kuas biasa ukr. 1 " bh 5,000 5,500 -
. Kuas lukis (pensil) bh 5,000 5,500 -
- -
M. BAHAN INSTALASI LISTRIK - -
- -
pa Union untuk kabel : - -
. 5/8 " - 4 m'. btg 12,500 6,000 6,600 13,000
. 1/2" - 4 m' btg 30,000 15,000 16,500 30,000
1" - 4 m' btg 45,000 28,000 30,800 45,000
. 1,5 - m' btg 180,000 198,000 -
. 2" - 4 m' btg 60,000 - 60,000
nie Union : - -
. 5/8 " bh 15,000 16,500 -
. T.Dos bh 4,000 4,400 -
1/2" btg 2,700 - 3,000
. 1" btg 6,300 - 6,000
. 1,5 " btg 25,000 27,500 -
2" btg 27,000 - 27,000
abel Listrik : - -
. Type NYA - -
- 1,5 mm. m¹ 2,500 1,850 2,035 3,000
- 2,5 mm. m¹ 5,000 2,900 3,190 5,000
- -
- -
. Type NYY - -
- 4 x 4 mm. m¹ 28,500 31,350 -
- 4 x 6 mm. m¹ 37,000 35,000 38,500 37,000
- 4 x 10 mm. m¹ 68,700 62,500 68,750 69,000
Type NYMhy - -
- 2 x 1,5 mm. m¹ 6,300 6,500 7,150 6,000
- 3 x 2,5 mm. m¹ 15,000 16,500 -
. NYM - -
- 3 x 2,5 mm. m¹ 13,200 12,000 13,200 13,000
- 4 x 2,5 mm. m¹ 16,500 15,000 16,500 17,000
- 3 x 4 mm. m¹ 21,450 19,500 21,450 21,000
- 4 x 4 mm. m¹ 25,300 23,000 25,300 25,000
. NYFGBY - -
- 4 x 4 mm. m¹ - -
- 4 x 6 mm. m¹ 65,000 - 65,000
- 4 x 10 mm. m¹ 94,000 - 94,000
- 4 x 16 mm. m¹ 125,000 - 125,000
- 4 x 25 mm. m¹ 325,000 357,500 -
ampu TL : - -
. 1 x 20 Watt. set 99,000 90,000 99,000 99,000
. 2 x 20 Watt. set 148,500 135,000 148,500 149,000
1 x 40 Watt. set 110,000 100,000 110,000 110,000
. 2 x 40 Watt. set 203,500 185,000 203,500 204,000
ampu Pijar : - -
. 25 Watt. bh 41,000 5,000 5,500 41,000
. 40 Watt. bh 158,000 5,000 5,500 158,000
60 Watt. bh 298,000 5,000 5,500 298,000
. 100 Watt bh 135,000 148,500 -
. Lampu Taman 80 W Mercury + Trafo + kaca bh 280,000 308,000 -
ampu Mercury : - -
. HPL 250 Watt. bh 71,500 65,000 71,500 72,000
. HPL 350 Watt. bh 300,000 330,000 -
Son-H 220 Watt. bh 400,000 440,000 -
. Son-H 350 Watt. bh 500,000 550,000 -
aklar Phase : - -
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
. Tunggal Putih (Broco) bh 11,500 13,000 14,300 12,000
. Tunggal Hitam (Broco) bh 26,000 25,000 27,500 26,000
Double Putih (Broco) bh 22,000 20,000 22,000 22,000
. Double Hitam (Broco) bh 40,700 37,000 40,700 41,000
top Kontak : - -
. Hitam (Broco) bh 13,500 13,000 14,300 14,000
. Putih (Broco) bh 33,000 24,000 26,400 33,000
. Zekring Kast Lokal Biasa bh 47,300 43,000 47,300 47,000
. Lokal 2 Group Automat bh 11,000 10,000 11,000 11,000
Lokal 3 Group Biasa bh 22,000 20,000 22,000 22,000
tting bh 11,000 10,000 11,000 11,000
kshaus : - Plafond bh 324,500 295,000 324,500 325,000
- Tembok bh 385,000 350,000 385,000 385,000
- -
N. BAHAN BBM, MINYAK DAN PELUMAS - -
- -
hiner ltr 60,000 30,000 33,000 60,000
at Epoxy ltr - -
inyak Cat ltr 12,000 30,000 33,000 12,000
ensin (Subsidi) ltr 6,900 6,450 7,095 7,000
olar ltr 9,300 10,800 11,880 9,000
inyak Bakar ltr 15,000 - 15,000
lie / Pelumas - -
Mesin Meditran SX Plus 15W - 40 ltr - -
Meditran S 40 ltr 40,700 37,000 40,700 41,000
Masri 150 FLG ltr 38,400 42,240 -
Rimula R4X 15W-40 Diesel Engine ltr 44,500 48,950 -
Rimula R2 10 W Diesel Engine ltr 40,500 44,550 -
Tellus S2 M 68 Hydraulic ltr 33,660 37,026 -
Tellus S2 M 46 Hydraulic ltr 40,500 44,550 -
Tellus S2 M 32 Hydraulic ltr 40,500 44,550 -
Omala S2 G 150 Gear and Bearing ltr 40,500 44,550 -
Spirax S4 ATF HDX Transmisi ltr 46,500 51,150 -
Spirax S2 G 90 Gear Oils ltr 61,800 67,980 -
Spirax S4 TXM Brake & Clutch Fluids ltr 37,700 41,470 -
52,500 57,750 -
- -
Gadus S2 V220 2 Greases kg 61,300 67,430 -
Spirax S2 A 85W -140 Gear Oils ltr 45,300 49,830 -
Rimula R2 50 Diesel Engine Oils ltr 38,100 41,910 -
Oli Spirax G90 (Oli Gardan) Shell ltr 37,700 41,470 -
ksigen @ 50 kg tabung - -
inyak Bekisting ltr 50,100 - 50,000
rease / Fet. kg - -
PG (15 kg) tabung - -
- -
O. BAHAN ASPAL - -
- -
itumen Asphal kg 14,900 - 15,000
sphal Coating kg 13,600 - 14,000
ATASAG kg 27,000 29,700 -
ATASBUSIR kg 27,000 29,700 -
ASBUTAG ton 850,000 935,000 -
TB ton 1,215,500 1,337,050 -
aston ton 1,490,000 - 1,490,000
ataston (HRS) ton 1,557,270 1,712,997 -
atasir ton 858,000 943,800 -
utas ton 858,000 943,800 -
- -
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
P. BAHAN LAIN-LAIN - -
- -
ayu Bakar m³ 52,300 - 52,000
ir m³ 22,500 24,750 -
mplas lbr 11,000 10,000 11,000 11,000
em Fox klg 28,000 15,000 16,500 28,000
em Kaca btl 40,000 44,000 -
Wall Paper m² 77,000 70,000 77,000 77,000
aret List Kaca m¹ 17,000 18,700 -
rofil Aluminium m¹ 135,000 135,000 148,500 135,000
ahan Additive kg 70,000 77,000 -
angka Hollow 1 x 2 m² 95,000 95,000 104,500 95,000
luminium untuk Rangka Grill m¹ 65,000 71,500 -
luminium untuk Grill m¹ 45,000 49,500 -
lass Wool m² 250,000 275,000 -
luminium Plat m² 605,000 550,000 605,000 605,000
ambu Lalu-lintas ukuran standar + tiang. bh - -
ntu fiber bh 495,000 450,000 495,000 495,000
oor closer bh 250,000 200,000 220,000 250,000
ntu besi / pintu aluminium m² 1,650,000 1,500,000 1,650,000 1,650,000
endela besi m² 550,000 550,000 605,000 550,000
ntu besi baja m² 800,000 800,000 880,000 800,000
orizontal/vertical blinds m² 130,000 143,000 -
arpet merk Monaco, tinggi = 4 m m² 225,000 247,500 -
arpet merk New Avalon, tinggi = 4 m m² 175,000 192,500 -
- -
Q. UPAH KERJA - -
- -
ekerja Terampil org/hr 118,000 85,000 93,500 118,000
ekerja Tidak Terampil org/hr 75,000 82,500 -
ekerja Kebersihan/ Cleaning Service. org/hr 75,000 82,500 -
ukang : - -
. Tukang Kayu org/hr 138,000 120,000 132,000 138,000
. Tukang Batu/ Asphal. org/hr 138,000 120,000 132,000 138,000
Tukang Cat org/hr 138,000 120,000 132,000 138,000
. Tukang Listrik org/hr 138,000 120,000 132,000 138,000
. Tukang Pipa org/hr 138,000 120,000 132,000 138,000
Tukang Besi org/hr 138,000 120,000 132,000 138,000
. Tukang Las org/hr 138,000 120,000 132,000 138,000
. Tukang Pancang org/hr 138,000 120,000 132,000 138,000
Tukang Foto org/hr 138,000 120,000 132,000 138,000
- -
epala Tukang : - -
. Kayu dan Las. org/hr 143,000 150,000 165,000 143,000
. Batu, Cat, Listrik, Pipa dan Besi org/hr 143,000 150,000 165,000 143,000
andor org/hr 163,000 150,000 165,000 163,000
andor Kebersihan/ Cleaning Service. org/hr 90,000 99,000 -
embantu Masinis/Operator org/hr 85,000 93,500 -
asinis/Operator org/hr 120,000 132,000 -
- -
- -
enjaga Gudang org/hr 80,000 88,000 -
enjaga Malam org/hr 80,000 88,000 -
- -
R. SEWA ALAT - -
- -
uldozer hr (8 Jam) 4,000,000 4,400,000 -
hovel hr (8 Jam) 4,000,000 4,400,000 -
Wheel Loader hr (8 Jam) 3,750,000 4,125,000 -
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
rader hr (8 Jam) 4,100,000 4,510,000 -
xcavator hr (8 Jam) 4,000,000 4,400,000 -
hree Wheel Roller (Walls) hr (8 Jam) 3,500,000 3,850,000 -
ired Roller hr (8 Jam) 4,500,000 4,950,000 -
andem Roller hr (8 Jam) 3,600,000 3,960,000 -
ibrator Roller hr (8 Jam) 3,750,000 4,125,000 -
aby Roller hr (8 Jam) 3,000,000 3,300,000 -
sphal Finisher hr (8 Jam) 2,500,000 2,750,000 -
sphal Sprayer. hr (8 Jam) 2,500,000 2,750,000 -
ompressor hr (8 Jam) 950,000 1,045,000 -
ruck hr (8 Jam) 950,000 1,045,000 -
rawler Crane 100 ton hr (8 Jam) 15,000,000 16,500,000 -
rawler Crane 50 ton hr (8 Jam) 13,000,000 14,300,000 -
rawler Crane 35 ton hr (8 Jam) 6,500,000 7,150,000 -
angki Air hr (8 Jam) 2,500,000 2,750,000 -
esin Las listrik hr (8 Jam) 1,000,000 1,000,000 1,100,000 1,000,000
esin Las Karbit hr (8 Jam) 2,000,000 2,200,000 -
olen hr (8 Jam) 750,000 825,000 -
ar Cutter hr (8 Jam) 450,000 495,000 -
ar Binder hr (8 Jam) 500,000 550,000 -
ack Hammer hr (8 Jam) 1,300,000 1,430,000 -
tamper hr (8 Jam) 2,500,000 2,750,000 -
ibrator beton 4 hp. hr (8 Jam) 300,000 330,000 -
ompa air 50 mm - 30 m3/jam. hr (8 Jam) 350,000 385,000 -
onton service 120 feet hr (8 Jam) 4,600,000 5,060,000 -
onton 180 feet + winch + anchor hr (8 Jam) 14,800,000 16,280,000 -
onton service << 100 feet hr (8 Jam) 800,000 880,000 -
enset hr (8 Jam) 1,500,000 1,650,000 -
lat bantu hr (8 Jam) 150,000 165,000 -
oader Breaker hr (8 Jam) 6,000,000 6,600,000 -
rader hr (8 Jam) 1,000,000 1,100,000 -
eisel Hammer (Inc. Ladder) hr (8 Jam) 6,000,000 6,600,000 -
rane on track hr (8 Jam) 2,500,000 2,750,000 -
le Driver hr (8 Jam) 1,500,000 1,650,000 -
oncrete pump hr (8 Jam) 5,200,000 5,720,000 -
asing hr (8 Jam) 250,000 275,000 -
ore Pile hr (8 Jam) 1,000,000 1,100,000 -
esin Bor hr (8 Jam) 150,000 165,000 -
ewa Theodolit hr (8 Jam) 75,000 82,500 -
ewa Waterpass hr (8 Jam) 25,000 27,500 -
ug Boat 320 HP hr (8 Jam) 1,000,000 1,100,000 -
railer hr (8 Jam) 1,000,000 1,100,000 -
- -
. BAHAN ALAT APUNG DAN ALAT DARAT - -
- -
ccu 12 volt - 120 Ah merk. GS (Gold Star) bh 2,915,000 2,650,000 2,915,000 2,915,000
ccu 12 volt - 200 Ah merk. GS (Gold Star) bh 3,800,000 3,800,000 4,180,000 3,800,000
an Luar 8.25-15 14 PR Gajah Tunggal bh 2,400,000 2,400,000 2,640,000 2,400,000
an Luar 7.50 - 16 14 PR bh 2,100,000 2,100,000 2,310,000 2,100,000
an Luar 1800 - 25 (Advance) bh 42,500,000 42,500,000 46,750,000 42,500,000
an Dalam 8.25 - 15 bh 337,500 337,500 371,250 338,000
antai 5/8 m¹ - -
antai 3/4 m¹ - -
ong Life Chain & Cable Grease - Omega 71 kg 601,700 601,700 661,870 602,000
Water Proof Open Gear Grease - Omega 73 kg 695,200 695,200 764,720 695,000
uperior Air Compressor Oil - Omega 613 kg 391,600 391,600 430,760 392,000
uper Diesel Additive - Omega 903 ltr 512,600 512,600 563,860 513,000
ndustrial Oil Concentrate - Omega 904 ltr 482,900 482,900 531,190 483,000
uper Engine Oil Additve - Omega 909 ltr 537,900 537,900 591,690 538,000
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
pecial Radiator Treatment Additive - Omega 906 ltr 544,500 544,500 598,950 545,000
eal Saver - Omega 917 ltr 2,187,100 2,187,100 2,405,810 2,187,000
weeper Main Brom bh 10,545,000 10,545,000 11,599,500 10,545,000
- -
- -
de / Front Brush bh 3,995,000 3,995,000 4,394,500 3,995,000
de Gasket bh 3,590,000 3,590,000 3,949,000 3,590,000
uel Filter iR-0755 CAT bh 1,020,000 1,020,000 1,122,000 1,020,000
ajun / kain lap (karung @ 50 kg) kg 22,000 22,000 24,200 22,000
inyak Rem Dot 3 btl 95,000 95,000 104,500 95,000
li Filter 1R - 1808 CAT bh 668,100 668,100 734,910 668,000
lter Water Separator (PN.8159975) Volvo bh 1,147,000 1,147,000 1,261,700 1,147,000
lter Water Separator (PN.316-9954) CAT bh 985,400 985,400 1,083,940 985,000
lter Oli By Pass (PN. 21707132) Volvo bh 501,000 501,000 551,100 501,000
uel Filter (PN. 8193841) Volvo bh 530,000 530,000 583,000 530,000
lter Oli (PN. 466634) Volvo bh 450,000 450,000 495,000 450,000
lter Oli Mesin (PN.32B4020100) Mitsubishi bh 300,000 300,000 330,000 300,000
uel Filter PN 3959612 merk Cummins bh 480,000 480,000 528,000 480,000
il Filter PN 3937743 merk Cummins bh 650,000 650,000 715,000 650,000
lter element oli mesin Hyundai bh 650,000 650,000 715,000 650,000
ir Filter PN 039705 merk Westerbeke bh 415,000 415,000 456,500 415,000
il Filter PN 036918 merk Westerbeke bh - -
-Belt Ribbed PN 4943125 merk Cummins bh - -
-Belt Ribbed PN 4981117 merk Cummins bh - -
at Intertuf 262 Red ltr 540,000 540,000 594,000 540,000
nterthane 990 Signal Blue ltr 515,000 515,000 566,500 515,000
nterthane 990 Signal Green ltr 515,000 515,000 566,500 515,000
nterthane 990 White ltr 515,000 515,000 566,500 515,000
ntertherm 891 Alumunium ltr 515,000 515,000 566,500 515,000
nterlac 665 White ltr 515,000 515,000 566,500 515,000
nterlac 665 Black ltr 515,000 515,000 566,500 515,000
nterlac 665 Caribbean Blue ltr 515,000 515,000 566,500 515,000
nterlac 665 Signal Blue ltr 515,000 515,000 566,500 515,000
nterlac 665 Signal Green ltr 515,000 515,000 566,500 515,000
hinner GTA 713/GTA 733 ltr 315,000.00 315,000 346,500 315,000
hinner GTA-004 ltr 315,000.00 315,000 346,500 315,000
- -
. BAHAN ATK (ALAT TULIS & KANTOR) - -
- -
mplop 110 x 230 pak - -
alpoin Snowman XI pak - -
alpoin Faster pak - -
alpoin Balliner ktk - -
aterai Eveready (Kecil) bh - -
aterai Remote AC bh - -
uku register Kiky (Folio) bh - -
uku Ekspedisi Folio (Besar) @ 100 lbr bh - -
uku Ekspedisi 1/2 Folio bh - -
uku Tabelaris 16 kolom bh - -
uku Kwitansi bh - -
older File Bantex bh - -
inder file 888 bh - -
inder Clips (Kecil) dos - -
inder Clips (Sedang) dos - -
inder Clips (Besar) bh - -
alkulator besar 8 digit (Casio) bh - -
alkulator kecil MJ (Casio) bh - -
alkulator besar 12 digit (Citizen)) bh - -
alkulator kecil (Citizen)) bh - -
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
lipper dos - -
utter L-500 (Kenko) bh - -
arbon folio (Daito) (isi 100 sheet) bh - -
ash disk 16 GB (Kingston) bh - -
ash disk 8 GB (Kingston) bh - -
ash disk 4 GB (Kingston) bh - -
ash disk 2 GB (Kingston) bh - -
le box bh - -
unting (Sedang) bh - -
unting Besar bh - -
ard Disk 500 GB bh - -
ekter (Kecil) bh - -
ekter (Besar) bh - -
si cutter (Kenko) dos - -
si hekter (isi 20 dos kecil) dos - -
si staples (Kecil) dos - -
- -
- -
si staples (Besar) dos - -
solasi Roll besar 1x72 bh - -
arton dosir folio bh - -
ertas Karbon Daito pak - -
ertas fax bh - -
ertas foto lbr - -
ertas HVS 70 gram (kwarto) rim - -
ertas HVS 80 gram (kwarto) rim - -
ertas HVS 80 gram (folio ) rim 400 440 -
ertas Continous Form 2 Ply box - -
ertas Continous Form 4 Ply box - -
ertas Continous Form 5 Ply box - -
em agung kertas (Besar) bh - -
em agung kertas (Kecil) bh - -
akban Hitam bh - -
ap lipat (Stop map) bh - -
ap Spring file 305 bh - -
ap Ordner plastik bh - -
ap Snelhecter (plastik) folio bh - -
istar besi 30 cm bh - -
ap plastik bh - -
ap bening bh - -
ap karton bh - -
ta mesin ketik (Daito) bh - -
elubang kertas (Besar) bh - -
elubang kertas (Kecil) bh - -
aper clips besar (Jumbo) (Isi 10 Dos Kecil) dos - -
aper clips (Isi 10 Dos Kecil) dos - -
enjepit kertas (Besar) bh - -
enjepit kertas (Sedang) bh - -
enjepit kertas (Kecil) bh - -
ulpen Balliner bh - -
ta printer Epson LX-300+ bh - -
ta printer Epson LX-300+ (refill) bh - -
ta printer Epson LX-2180 bh - -
ta printer Epson LX 300 bh - -
ta Printer Epson LQ 2190 bh - -
ost It 5 Warna (Sign Here) bh - -
efill Kit DP 40 Hitam bh - -
e-Type bh - -
pidol besar B'Marker bh - -
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
pidol kecil bh - -
taples (Besar) bh - -
taples (Kecil) bh - -
alk Powder bh - -
inta cartridge (Black) uk. 40 Canon bh - -
inta cartridge (Black) uk. 27 HP bh - -
inta cartridge (Black) uk. 41 Canon bh - -
inta cartridge (Black) uk. 831 Canon bh - -
inta printer HP laser jet 1020 (Tunner) bh - -
inta printer HP laser jet 1020 (Refill) bh - -
inta printer EPSON L210 btl - -
inta printer yellow CANON 200 ml btl - -
inta printer Cyan CANON 200 ml btl - -
inta printer Canon warna KMHB warna bh - -
inta printer Cyan ERC-38 bh - -
inta stempel warna biru bh - -
inta printer Pixma IP-1880 bh - -
inta printer Pixma MP 145 300 ml btl - -
inta printer Toner 12 A Laser jet 1020 bh - -
inta printer Toner 49 A Laser jet 1020 bh - -
inta Printer L 210 (warna) set 45,000 49,500 -
inta EPSON T6641 Black btl - -
inta printer LX 310 Ori bh - -
ipp Ex bh - -
inta isi ulang ( Hitam, Merah, Kuning, Biru) btl - -
oner Laserjet HP 85 A bh - -
oner Laserjet HP 35 A bh - -
dner Gobby bh - -
ri PG 810 bh - -
- -
- -
ri HP 802 BK bh - -
ri HP 802 CL bh - -
- -
. BAHAN TIANG PANCANG - -
- -
iang Pancang Beton - -
Diamater 30 cm (Bottom Mamira) m¹ - -
Diamater 30 cm (Middle) m¹ - -
Diamater 40 cm (Bottom Mamira) m¹ - -
Diamater 40 cm (Middle) m¹ - -
Diamater 50 cm (Bottom Mamira) m¹ - -
Diamater 50 cm (Middle) m¹ - -
Diamater 60 cm (Bottom Mamira) m¹ - -
Diamater 60 cm (Middle) m¹ - -
iang Pancang Baja - -
Diamater 32,38 cm (12¾") tebal 12 mm m¹ - -
Diamater 40,64 cm (16") tebal 12 mm m¹ - -
Diamater 40,64 cm (16") tebal 14 mm m¹ - -
Diamater 60,96 cm (24") tebal 12 mm m¹ - -
Diamater 60,96 cm (24") tebal 14 mm m¹ - -
Diamater 60,96 cm (24") tebal 16 mm m¹ - -
Diamater 81,28 cm (32") tebal 12 mm m¹ - -
Diamater 81,28 cm (32") tebal 14 mm m¹ - -
Diamater 81,28 cm (32") tebal 16 mm m¹ - -
Diamater 101,6 cm (40") tebal 12 mm m¹ - -
Diamater 101,6 cm (40") tebal 14 mm m¹ - -
Diamater 101,6 cm (40") tebal 16 mm m¹ - -
Diamater 121,9 cm (48") tebal 12 mm m¹ - -
HARGA SATUAN SEMESTER I 2019
MAKASSAR
SATUAN SURVEY +
JENIS BAHAN PU SURVEY LAP TRIW. I
PROFIT
(RP.) (RP.) (RP.) (RP.)
2 3 4 5 6 5
Diamater 121,9 cm (48") tebal 14 mm m¹ - -
Diamater 121,9 cm (48") tebal 16 mm m¹ - -
- -
Makassar , Januari 2018

MENYETUJUI MENGETAHUI TIM PENYUSUN HARGA SATUAN UPAH,


GENERAL MANAGER MANAGER TEKNIK BAHAN DAN ALAT TAHUN 2018

1. NAJEMUDIN
(KETUA)
ARIS TUNRU ZULFA SAYUTI
2. HERMAJI MIFTAH
(SEKRETARIS)

3. MATHEUS DEMONG
(ANGGOTA)

4. ZULKARNAIN
(ANGGOTA)

5. ROMI DELA ROSA


(ANGGOTA)
RENCANA ANGGARAN BIAYA

REKAPITULASI

NO URAIAN PEKERJAAN JUMLAH

I PRELIMINARY Rp 75,808,178.05
II PEKERJAAN GEDUNG TRIBUN UTAMA
A STRUKTUR Rp 569,959,096.81
B ARSITEKTUR Rp 684,255,540.45
III PEKERJAAN GEDUNG PENCAT SILAT DAN GEDUNG ANGGAR
A STRUKTUR Rp 1,798,908,290.04
B ARSITEKTUR Rp 2,126,370,035.31
IV PEKERJAAN ELEKTRIKAL Rp 361,783,105.24
V PEKERJAAN MEKANIKAL Rp 106,081,661.14
Total Real Cost ( Upah + Bahan ) Rp 5,723,165,907.04
Ppn 10% 572,316,590.70
T O T A L Rp 6,295,482,497.75
DIBULATKAN Rp 6,295,483,000.00

TERBILANG : Enam Milyar Dua Ratus Sembilan Puluh Lima Juta Sembilan Ratus Tujuh Puluh Delapan Juta Rupiah
RENCANA ANGGARAN BIAYA

I. PEKERJAAN PRELIMINARY
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI VOLUME SAT
(Rp) (Rp)
1 Pek. Mobilisasi dan demobilisasi 1.00 ls 12,000,000.00 12,000,000.00
2 Pek. Administrasi & dokumentasi 1.00 ls 8,854,780.00 8,854,780.00
3 Pek. Pengukuran & Stackingout 1.00 ls 2,000,000.00 2,000,000.00
4 Pek. Pembuatan direksi keet dan gudang 20.00 m2 1,206,826.50 24,136,530.00
5 Keselamatan dan kesehatan kerja (K3) serta perlengkapannya 1.00 ls 16,912,500.00 16,912,500.00
6 Pek. Pembuatan papan nama proyek 1.00 bh 1,056,300.30 1,056,300.30
7 Pek. Bongkaran
7.a Pek. Bongkaran dinding batu bata 152.1 m2 15,541.68 2,363,889.53
7.b Pek. Bongkaran lantai 574.303 m2 14,773.00 8,484,178.22
75,808,178.05
RENCANA ANGGARAN BIAYA
PEKERJAAN GEDUNG TRIBUN UTAMA

II. PEKERJAAN STRUKTUR


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI VOLUME SAT Koefisien Semen Pasir Cipping / Batu Pecah Batu Gunung / Kali
Analisa
A PEK. LANTAI 1 Koef Jumlah Koef Jumlah Koef Jumlah Koef Jumlah
1 Pekerjaan Pondasi
1.a Pek. Pondasi Poer Plat, 80x80x30 cm
a.1 Pek. Galian Poer Plat 17.75 m3 96,998.00 1,721,229.51
a.2 Pek. Urugan Pasir Poer Plat 0.59 m3 151,613.00 89,679.09 1.200 0.71
a.3 Pek. Lantai Kerja Poer Plat, K-100 0.59 m3 786,115.06 464,987.06 4.600 2.72 0.496 0.29 0.708 0.42
a.4 Pek. Beton K-300 Poer Plat 1.34 m3 1,129,431.28 1,517,955.64
a.5 Pek. Pembesian Poer Plat 545.18 kg 16,404.30 8,943,311.25
a.6 Pek. Bekisting Pondasi 40.32 m2 175,269.60 7,066,870.27
a.7 Pek. Urugan kembali galian 5.32 m3 73,865.00 393,220.33
20,197,253.15
1.b Pek. Pondasi batu kali
d.1 Pek. Galian pondasi 8.33 m3 96,998.00 807,653.85
d.2 Pek. Urugan Pasir, 5 cm 3.84 m3 151,613.00 581,577.99
d.3 Pek. Pas. batu kosong (Anstamping) 5.71 m 3
421,931.40 2,410,109.08
d.4 Pek. Pas. Batu kali, camp 1:3 4.37 m3 832,194.00 3,635,023.39
d.5 Pek. Urugan kembali galian 2.50 m3 73,865.00 184,511.08
7,618,875.38
1.c Pek. Sloof S1, 15x20 cm
c.1 Pek. Beton K-175 1.07 m3 946,931.15 1,008,481.67
c.2 Pek. Pembesian 192.17 kg 16,404.30 3,152,445.95
c.3 Pek. Bekisting 14.20 m2 148,948.80 2,115,072.96
6,276,000.59
2 Pekerjaan Kolom
2.a Pek. Kolom Pedestial 30x50 cm
a.1 Pek. Beton K-300 1.10 m3 1,129,431.28 1,245,197.99
a.2 Pek. Pembesian 339.75 kg 16,404.30 5,573,302.77
a.3 Pek. Begisting 8.82 m2 323,711.30 2,855,133.67
2.b Pek. Kolom Pedestial 40x40 cm
b.1 Pek. Beton K-300 3.20 m3 1,129,431.28 3,614,180.10
b.2 Pek. Pembesian 816.30 kg 16,404.30 13,390,874.68
b.3 Pek. Begisting 32.00 m2 323,711.30 10,358,761.60
2.c Pek. Kolom Praktis 11x11 cm, K-175 181.00 m' 103,145.90 18,669,407.90
55,706,858.70
3 Pekerjaan Balok dan Ringbalk
3.a Pek. Balok baja (TOB.3.2 m)
a.1 Pek. IWF 200x100x5.5x8 mm 50.45 m' 571,150.47 28,811,685.40
a.2 Pek. Pelat stiffner & end plate, 1.5 cm 29.85 kg 23,411.96 698,856.76
a.3 Pek. Base plate, 30x50x0.1 cm 188.40 kg 23,411.96 4,410,813.26
a.4 Pek. Angkur, Ø12, kedalaman 15 cm 16.50 kg 72,390.56 1,194,804.05
3.b Pek. Balok baja (TOB.8.7 m)
b.1 Pek. IWF 200x100x5.5x8 mm 50.45 m' 571,150.47 28,811,685.40
b.2 Pek. Pelat stiffner & end plate, 1.5 cm 29.85 kg 23,411.96 698,856.76
b.3 Pek. Base plate, 30x50x0.1 cm 188.40 kg 23,411.96 4,410,813.26
b.4 Pek. Angkur, Ø12, kedalaman 15 cm 16.50 kg 72,390.56 1,194,804.05
3.c Pek. Balok baja (TOB.12.25 m)
b.1 Pek. IWF 200x100x5.5x8 mm 46.95 m' 571,150.47 26,815,514.51
b.2 Pek. Pelat stiffner & end plate, 1.5 cm 15.92 kg 23,411.96 372,672.97
b.3 Pek. Base plate, 30x50x0.1 cm 25.12 kg 23,411.96 588,108.44
b.4 Pek. Angkur, Ø12, kedalaman 15 cm 8.80 kg 72,390.56 637,228.83
98,645,843.69
4 Pekerjaan Baja
4.a Pek. Kolom baja depan
a.1 Pek. IWF 400x200x8x13 mm 91.00 m' 1,702,815.80 154,956,238.00
a.2 Pek. Pelat stiffner & end plate, 1.5 cm 13.93 kg 23,411.96 326,047.32
a.3 Pek. Base plate, 30x50x0.1 cm 87.92 kg 23,411.96 2,058,379.52
a.4 Pek. Angkur, Ø12, kedalaman 15 cm 11.55 kg 72,390.56 836,362.84
4.b Pek. Kolom baja samping
b.1 Pek. IWF 200x100x5.5x8 mm 16.00 m' 571,150.47 9,138,407.50
b.2 Pek. Pelat stiffner & end plate, 1.5 cm 4.71 kg 23,411.96 110,270.33
b.3 Pek. Base plate, 30x50x0.1 cm 17.27 kg 23,411.96 404,324.55
b.4 Pek. Angkur, Ø12, kedalaman 15 cm 1.10 kg 72,390.56 79,653.60
4.c Pek. Kolom bulat
b.1 Pek. Kolom Pipa Ø6 28.40 m' 524,813.80 14,904,711.84
b.2 Pek. Pelat stiffner & end plate, 1.5 cm 42.39 kg 23,411.96 992,432.98
b.3 Pek. Base plate, 30x50x0.1 cm 50.24 kg 23,411.96 1,176,216.87
b.4 Pek. Angkur, Ø12, kedalaman 15 cm 4.40 kg 72,390.56 318,614.41
4.d Pek. Kanopi Pintu Kedatangan
d.1 Pek. Balok Baja
1.a Pek. IWF 200x100x5.5x8 mm 12.00 m' 571,150.47 6,853,805.63
1.b Pek. Pelat stiffner & end plate, 1.5 cm 7.07 kg 23,411.96 165,405.50
1.c Pek. Base plate, 30x50x0.1 cm 25.91 kg 23,411.96 606,486.82
1.d Pek. Angkur, Ø12, kedalaman 15 cm 2.48 kg 72,390.56 179,220.61
d.2 Pek. Besi hollow 40x40x1.8 mm 172.61 m' 39,938.49 6,893,582.98
200,000,161.29
B PEK. ATAP
1 Pekerjaan Atap
1.a Pek. Kuda-kuda atap
a.1 Pek. I WF 200 x 100 x 5,7 x 8 mm – 12 M ASTM-A53 142.00 m' 571,150.47 81,100,510.82
a.3 Pek. Base plate 5 mm 259.14 kg 23,411.96 6,067,073.64
a.4 Pek. Angkur & baut, Angker D 12 mm & baut D 24 mm , kedalaman 15 cm 10.44 kg 72,390.56 755,424.50
a.5 Pek. Purlin C 150x50x20x2.3 mm 667.80 m' 115,758.28 77,303,379.38
(a) Pek. Cleat plate 5 mm 207.34 kg 23,411.96 4,854,237.83
(b) Pek. Sagrod Ø 10 mm + Nut & Washier 130.37 kg 16,404.30 2,138,604.99
(c) Bolt M8 + Nut & Washier 325.92 bh 7,369.20 2,401,780.00
(d) Wind Bracing Ø 12 mm + acc 258.56 kg 16,404.30 4,241,556.04
(e) Jarum keras M16 36.00 bh 73,653.80 2,651,536.80
181,514,104.00
569,959,096.81 4.6
RENCANA ANGGARAN BIAYA
PEKERJAAN GEDUNG TRIBUN UTAMA

III. PEKERJAAN ARSITEKTUR


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI VOLUME SAT

1 Pekerjaan Pasangan dinding & Plesteran


1.a Pek. Plesteran dinding bata merah, Camp 1:3, (dinding lama) 586.32 m2 79,201.98 46,437,704.91
1.b Pek. Acian dinding, (dinding lama) 732.90 m2 48,653.00 35,657,783.70
1.d Pek. Dinding bata merah, Camp 1:3, dinding baru 97.02 m2 141,728.62 13,750,794.17
1.e Pek. Plesteran dinding bata merah, Camp 1:3, dinding baru 197.04 m2 79,201.98 15,606,274.95
1.f Pek. Acian dinding, dinding baru 194.04 m2 48,653.00 9,440,822.73
120,893,380.46
2 Pekerjaan pelapis lantai & dinding
2.a Pek. Homogenus tile 60x60 cm polished Granit 382.863 m2 278,424.30 106,598,362.77
2.b Pek. Homogenus tile 60x60 cm polished warna Granit 92.190 m2 278,424.30 25,667,936.22
2.c Pek. Homogenus tile 25x40 cm polished, Dinding toilet Granit 99.250 m2 130,235.60 12,925,883.30
2.d Pek. Homogenus tile 40x40 cm Unpolished, Lantai toilet Granit 26.254 m2 156,125.75 4,098,925.44
2.e Pek. Floor hardener Tribun Penonton MU-700 486.375 m2 113,402.30 55,156,043.66
204,447,151.39
3 Pekerjaan Dinding Partisi, Pintu & Jendela
3.a Pek. Dinding partisi gypsum, DP3 Gypsum 12mm, Elephant/setara 28.875 m2 169,321.64 4,889,162.24
3.b Pek. Pintu & Jendela
b.1 Pek. Pintu P1 Aluminium 7.000 bh 3,795,110.41 26,565,772.90
b.2 Pek. Pintu P3 Aluminium 6.000 bh 5,089,074.32 30,534,445.93
b.3 Pek. Pintu P4 Aluminium 10.000 bh 1,600,000.00 16,000,000.00
b.4 Pek. Pintu P5 Aluminium 2.000 bh 8,001,239.46 16,002,478.91
b.5 Pek. Pintu P6 Aluminium 2.000 bh 5,708,992.48 11,417,984.95
b.6 Pek. Jendela J1 Aluminium 4.000 bh 5,925,579.99 23,702,319.96
129,112,164.89
4 Pekerjaan Plafon & Langit-langit
4.a Pek. Pemasangan rangka plafond gypsum hollow 2/2 & 2/4 + Profil C 75/0.6 mm 258.049 m2 130,209.57 33,600,448.47
4.b Pek. Pemasangan plafond gypsum 9 mm Elephant/setara 258.049 m2 54,124.40 13,966,747.30
47,567,195.76
5 Pekerjaan Pengecatan
5.a Pek. Pengecatan dinding bata merah Dulux/setara 926.944 m2 49,128.64 45,539,498.08
5.b Pek. Pengecatan plafond gypsum Dulux/setara 258.049 m2 54,453.96 14,051,789.92
5.c Pek. Pengecatan baja Nippon/setara 279.664 m2 41,959.50 11,734,561.61
71,325,849.61
6 Pekerjaan Sanitair
6.a Pek. Closed Duduk Monoblok Toto/setara 5.00 unit 3,249,081.00 16,245,405.00
6.b Pek. Jet Washer Onda/setara 5.00 unit 233,832.50 1,169,162.50
6.c Pek. Floor drain stainless steel Onda/setara 6.00 bh 146,624.50 879,747.00
6.d Pek. Wastafel Toto/setara 1.00 unit 1,212,486.00 1,212,486.00
6.d Pek. Urinoir Toto/setara 2.00 unit 2,861,166.00 5,722,332.00
6.e Pek. Keran air dinding 3/4" Toto/setara 11.00 bh 80,932.50 890,257.50
26,119,390.00
7 Pekerjaan Atap
7.a Pek. Atap spandek utama Tribun Utama 0.35 mm 750.882 m2 97,374.20 73,116,534.04
7.b Pek. Nok/bubungan atap spandek 37.200 m' 53,962.70 2,007,412.44
7.c Pek. Talang Air Seng pelat 3' x 6' BJLS 28 74.400 m' 129,925.56 9,666,461.85
84,790,408.33
RENCANA ANGGARAN BIAYA
PEKERJAAN GEDUNG PENCAT SILAT DAN GEDUNG ANGGAR

II. PEKERJAAN STRUKTUR


HARGA SATUAN
NO URAIAN PEKERJAAN SPESIFIKASI VOLUME SAT
(Rp)
A PEK. BANGUNAN UTAMA
1 Pekerjaan Pondasi
1.a Pek. Pondasi Poer Plat, P1 120x120x40 cm
a.1 Pek. Galian Poer Plat 12.54 m3 96,998.00
a.2 Pek. Urugan Pasir Poer Plat 1.15 m3 151,613.00
a.3 Pek. Lantai Kerja Poer Plat, K-100 1.15 m3 786,115.06
a.4 Pek. Beton K-300 Poer Plat 9.22 m3 1,129,431.28
a.5 Pek. Pembesian Poer Plat 896.21 kg 16,404.30
a.6 Pek. Bekisting Pondasi 30.72 m2 175,269.60
a.7 Pek. Urugan kembali galian 3.76 m3 73,865.00
1.b Pek. Pondasi Poer Plat, P2 100x100x40 cm
b.1 Pek. Galian Poer Plat 10.08 m3 96,998.00
b.2 Pek. Urugan Pasir Poer Plat 0.85 m3 151,613.00
b.3 Pek. Lantai Kerja Poer Plat, K-100 0.70 m3 786,115.06
b.4 Pek. Beton K-300 Poer Plat 5.60 m3 1,129,431.28
b.5 Pek. Pembesian Poer Plat 820.71 kg 16,404.30
b.6 Pek. Bekisting Batako 22.40 m2 175,269.60
b.7 Pek. Urugan kembali galian 3.02 m3 73,865.00
1.c Pek. Pondasi batu kali
c.1 Pek. Galian pondasi 11.17 m3 96,998.00
c.2 Pek. Urugan Pasir, 5 cm 0.95 m3 151,613.00
c.3 Pek. Pas. batu kosong (Anstamping) 3.11 m3 421,931.40
c.4 Pek. Pas. Batu kali, camp 1:3 5.86 m3 832,194.00
c.5 Pek. Urugan kembali galian 3.35 m3 73,865.00
1.d Pek. Pondasi bata rollag
d.1 Pek. Galian pondasi 0.12 m3 96,998.00
d.2 Pek. Urugan Pasir, 5 cm 0.24 m3
151,613.00
d.3 Pek. Pondasi bata rollag 1.24 m3 141,728.62
d.4 Pek. Urugan kembali galian 36.00 m3 73,865.00
1.e Pek. Timbunan
e.1 Pek. Timbunan tanah 425.60 m3 190,052.50

2 Pek. Sloof
2.a Pek. Sloof S1, 25x40 cm
a.1 Pek. Beton K-175 14.86 m3 946,931.15
a.2 Pek. Pembesian 1,685.99 kg 16,404.30
a.3 Pek. Bekisting 118.88 m2 148,948.80
2.b Pek. Sloof S1, 15x25 cm
b.1 Pek. Beton K-175 1.20 m3 946,931.15
b.2 Pek. Pembesian 168.89 kg 16,404.30
b.3 Pek. Bekisting 15.97 m2 148,948.80

3 Pekerjaan Plat Lantai & Dinding


3.a Pek. Plat lantai
a.1 Pek. Urugan Pasir, 15 cm 21.34 m3 151,613.00
a.2 Pek. Lantai Kerja K-100, 5 cm 7.11 m3 786,115.06
3.b Pek. Plat Lantai Utama15 cm
b.1 Pek. Urugan Pasir, 15 cm 165.71 m3 151,613.00
b.2 Pek. Lantai Kerja K-100, 5 cm 13.81 m3 786,115.06
b.3 Pek. Beton K-175 41.43 m3 946,931.15
b.4 Pek. Pembesian 865.03 m2 16,404.30
b.5 Pek. Begisting 10.32 m2 472,738.20

4 Pekerjaan Kolom
4.a Pek. Kolom K1, 40x40 cm
a.1 Pek. Beton K-300 19.20 m3 1,129,431.28
a.2 Pek. Pembesian 4,722.73 kg 16,404.30
a.3 Pek. Begisting 172.80 m2 323,711.30
4.b Pek. Kolom Praktis 11x11 cm, K-175 88.75 m' 103,145.90

5 Pekerjaan Balok dan Ringbalk


5.a Pek. Balok B1 25x40 cm
a.1 Pek. Beton K-250 4.32 m3 1,068,100.92
a.2 Pek. Pembesian 1,260.39 kg 16,404.30
a.3 Pek. Bekisting 45.38 m2 280,100.70
5.b Pek. Balok B2 20x30 cm
b.1 Pek. Beton K-250 1.37 m3 1,068,100.92
b.2 Pek. Pembesian 312.07 kg 16,404.30
b.3 Pek. Bekisting 18.24 m2 280,100.70
5.c Pek. Balok Listplank 10x40 cm
c.1 Pek. Beton K-175 1.19 m3 946,931.15
c.2 Pek. Pembesian 158.00 kg 16,404.30
c.3 Pek. Bekisting 26.67 m2 280,100.70

B PEK. ATAP
1 Pekerjaan Balok dan Ringbalk
1.a Pek. Balok B1 25x40 cm
a.1 Pek. Beton K-250 11.82 m3 1,068,100.92
a.2 Pek. Pembesian 1,486.74 kg 16,404.30
a.3 Pek. Bekisting 124.07 m2 280,100.70
1.b Pek. Balok B2 20x30 cm
b.1 Pek. Beton K-250 1.33 m3 1,068,100.92
b.2 Pek. Pembesian 206.94 kg 16,404.30
b.3 Pek. Bekisting 19.98 m2 280,100.70
1.c Pek. Balok Listplank 10x40 cm
c.1 Pek. Beton K-175 2.60 m3 946,931.15
c.2 Pek. Pembesian 103.57 kg 16,404.30
c.3 Pek. Bekisting 23.87 m2 280,100.70
1.d Pek. Ringbalk 20x30 cm
d.1 Pek. Beton K-175 2.04 m3 946,931.15
d.2 Pek. Pembesian 309.92 kg 16,404.30
d.3 Pek. Bekisting 20.40 m2 280,100.70
1.e Pek. Ringbalk 12x15 cm
e.1Pek. Beton K-175 0.83 m3 946,931.15
e.2Pek. Pembesian 263.68 kg 16,404.30
e.3 Pek. Bekisting 11.04 m2 280,100.70

2 Pekerjaan Plat lantai & dinding


2.a Pek. Plat lantai 10 cm (TOP +3.2 )
a.1 Pek. Beton K-175 2.30 m3 1,068,100.92
a.2 Pek. Pembesian 858.48 m2
16,404.30
a.3 Pek. Bekisting 23.00 m2
385,283.00
2.b Pek. Plat lantai 10 cm (TOP +3.7 )
a.1 Pek. Beton K-175 16.30 m3 1,068,100.92
a.2 Pek. Pembesian 2,221.27 m2 16,404.30
a.3 Pek. Bekisting 135.85 m2 385,283.00

3 Pekerjaan Kolom
3.a Pek. Kolom K1, 40x40 cm
a.1 Pek. Beton K-300 1.12 m3 1,129,431.28
a.2 Pek. Pembesian 353.66 kg 16,404.30
a.3 Pek. Begisting 11.20 m2 323,711.30
3.b Pek. Kolom Praktis 11x11 cm, K-175 10.22 m' 103,145.90

4 Pekerjaan Baja
4.a Pek. Kuda-kuda atap
a.1 Pek. I WF 400 x 200 x 8 x 13 mm – 12 M ASTM-A53 65.46 m' 1,702,815.80
a.3 Pek. Base plate 5 mm 35.80 kg 23,411.96
a.4 Pek. Angkur & baut, Angker D 12 mm & baut D 24 mm , kedalaman 11.93 kg 72,390.56
a.5 Pek. Purlin C 150x50x20x2.3 mm 318.40 m' 115,758.28
(a) Pek. Cleat plate 5 mm 73.38 kg 23,411.96
(b) Pek. Sagrod Ø 10 mm + Nut & Washier 78.88 kg 16,404.30
(c) Bolt M8 + Nut & Washier 197.19 bh 6,388.80
(d) Wind Bracing Ø 12 mm + acc 129.82 kg 16,404.30

1 Bangunan
2 Bangunan
JUMLAH HARGA
(Rp)

1,216,742.91
174,658.18
905,604.55
10,408,838.70
14,701,747.79
5,384,282.11
277,968.77

977,739.84
128,416.21
550,280.54
6,324,815.18
13,463,173.90
3,926,039.04
223,367.76

1,083,143.69
144,553.52
1,311,127.99
4,874,925.88
247,447.60

11,639.76
36,387.12
176,026.95
2,659,140.00

80,885,583.79

150,093,651.78

14,071,396.89
27,657,516.43
17,707,033.34

1,134,186.78
2,770,553.41
2,378,712.34
65,719,399.20

3,235,542.71
5,592,108.11

25,123,487.00
10,855,462.91

44,806,600.74

21,685,080.62
77,473,044.34
55,937,312.64
9,154,198.63
164,249,636.22
4,616,332.16
20,675,882.59
12,711,249.87

1,461,162.05
5,119,210.32
5,109,036.77

1,122,302.80
2,591,827.19
7,469,445.37
60,876,449.11

12,620,680.43
24,388,965.30
34,751,533.65

1,416,301.82
3,394,668.70
5,597,532.39

2,465,808.71
1,699,064.99
6,686,003.71

1,931,739.55
5,084,101.16
5,714,054.28

784,058.99
4,325,494.07
3,092,311.73
113,952,319.47
2,456,632.11
14,082,823.31
8,861,509.00

17,411,668.46
36,438,344.14
52,339,154.42
131,590,131.43

1,264,963.04
5,801,494.72
3,625,566.56
1,054,151.10
11,746,175.42

111,459,511.15
838,054.52
863,342.28
36,857,436.35
1,718,011.77
1,293,918.69
1,259,820.25
2,129,686.65

156,419,781.66
899,454,145.02
1,798,908,290.04
RENCANA ANGGARAN BIAYA
PEKERJAAN GEDUNG PENCAT SILAT DAN GEDUNG ANGGAR

III. PEKERJAAN ARSITEKTUR


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI VOLUME SAT
(Rp) (Rp)
A BANGUNAN UTAMA
1 Pekerjaan Pasangan dinding & Plesteran
1.a Pek. Dinding bata merah, Camp 1:3, terminal 463.45 m2 141,728.62 65,684,213.98
1.b Pek. Plesteran dinding bata merah, Camp 1:3, terminal 926.90 m2 79,201.98 73,412,410.30
1.c Pek. Acian dinding, terminal 926.90 m2 48,653.00 45,096,524.08
184,193,148.36
2 Pekerjaan pelapis lantai & dinding
2.a Pek. Homogenus tile 60x60 cm polished Ex Granito/setara 86.524 m2 278,424.30 24,090,384.13
2.b Pek. Homogenus tile 60x60 cm polished warnah Ex Granito/setara 39.142 m2 278,424.30 10,898,083.95
2.c Pek. Homogenus tile 25x40 cm polished, Dinding toilet Ex Granito/setara 43.776 m2 130,235.60 5,701,193.63
2.d Pek. Homogenus tile 40x40 cm Unpolished, Lantai toilet Ex Granito/setara 15.520 m2 156,125.75 2,423,071.64
2.e Pek. Floor hardener MU-700 298.190 m2 113,402.30 33,815,431.84
76,928,165.19
3 Pekerjaan Pintu, Jendela dan Ventilasi
3.a Pek. Pintu & Jendela
a.1 Pek. Pintu P1 Aluminium 6.000 bh 3,795,110.41 22,770,662.49
a.2 Pek. Pintu P2 Aluminium 2.000 bh 7,188,644.32 14,377,288.64
a.3 Pek. Pintu P4 Aluminium 8.000 bh 1,600,000.00 12,800,000.00
a.4 Pek. V1 Aluminium 8.000 bh 239,438.53 1,915,508.23
51,863,459.35
4 Pekerjaan Plafon & Langit-langit
4.a Pek. Pemasangan rangka plafond gypsum hollow 2/2 & 2/4 + Profil C 75/0.6 mm 61.589 m2 130,209.57 8,019,477.00
4.b Pek. Pemasangan plafond gypsum 9 mm Gypnoc/setara 61.589 m2 54,124.40 3,333,467.67
11,352,944.67
5 Pekerjaan Pengecatan
5.a Pek. Pengecatan dinding bata merah Dulux/setara 926.901 m2 49,128.64 45,537,395.37
5.b Pek. Pengecatan plafond gypsum Dulux/setara 61.589 m2 54,453.96 3,353,764.94
5.c Pek. Pengecatan baja Nippon/setara 93.600 m2 41,959.50 3,927,409.20
52,818,569.51
6 Pekerjaan Sanitari
6.a Pek. Closed Duduk Monoblok Toto/setara 4.00 unit 3,249,081.00 12,996,324.00
6.b Pek. Jet Washer Onda/setara 4.00 unit 233,832.50 935,330.00
6.c Pek. Floor drain stainless steel Toto/setara 5.00 bh 146,624.50 733,122.50
6.d Pek. Wastafel Toto/setara 5.00 unit 1,212,486.00 6,062,430.00
6.e Pek. Urinoir Toto/setara 2.00 unit 2,861,166.00 5,722,332.00
6.f Pek. Keran air dinding 3/4" Toto/setara 5.00 bh 80,932.50 404,662.50

26,854,201.00
7 Pekerjaan Fasade
7.a Pek. Alucopan Pembungkus fasade (depan) Alucopan 0.3 (4) mm PVDF 280.307 m2 872,412.07 244,543,209.55
7.b Pek. Alucopan Pembungkus fasade (samping) Alucopan 0.3 (4) mm PVDF 80.643 m2 872,412.07 70,353,926.40
7.c Pek. Alucopan Pembungkus fasade (belakang) Alucopan 0.3 (4) mm PVDF 185.853 m2 872,412.07 162,140,400.08
7.d Pek. Pelapis kolom Alucopan 0.3 (4) mm PVDF 18.000 m2 872,412.07 15,703,417.22
492,740,953.25
B ATAP
1 Pekerjaan Pasangan dinding & Plesteran
1.a Pek. Dinding bata merah, Camp 1:3 35.980 m2 141,728.62 5,099,395.75
1.b Pek. Plesteran dinding bata merah, Camp 1:3 71.960 m2 79,201.98 5,699,374.48
1.c Pek. Acian dinding 71.960 m2 48,653.00 3,501,069.88
14,299,840.11
2 Pekerjaan pelapis lantai & dinding
2.a Pek. Waterprofing membrant Flashband self addhisive 242.153 m2 374,275.00 90,631,814.08
90,631,814.08
3 Pekerjaan Pengecatan
3.a Pek. Pengecatan dinding bata merah Dulux/setara 71.960 m2 41,400.00 2,979,144.00
3.b Pek. Pengecatan baja Nippon/setara 159.840 m2 39,364.50 6,292,021.68
9,271,165.68
4 Pekerjaan Fixture
4.a Pek. Roof drain 4" stainless steel 8.000 bh 60,542.90 484,343.20
484,343.20
5 Pekerjaan Atap
5.a Pek. Atap spandek utama 0.35 mm 327.280 m2 97,374.20 31,868,628.18
5.b Pek. Nok/bubungan atap spandek 20.000 m' 53,962.70 1,079,254.00
5.c Pek. Pelapis Aluminium Foil/sisalition 327.280 m² 40,022.40 13,098,531.07
5.c Pek. Turbin Ventilator 6.000 bh 950,000.00 5,700,000.00
51,746,413.25
1,063,185,017.66
2,126,370,035.31
RENCANA ANGGARAN BIAYA

IV. PEKERJAAN ELEKTRIKAL


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI VOLUME SAT
(Rp) (Rp)
A BANGUNAN UTAMA
1 Pekerjaan Elektrikal
1.a Biaya penyambungan daya PLN
a.1 Biaya Penyambungan (BP) ### Va 315.5 50,480,000.00
a.2 Uang Jaminan Pelanggan (UJL) ### Va 50.0 8,000,000.00
a.3 Sertifikat layak operasi (SLO) ### Va 17.0 2,720,000.00
1.b Pengadaan dan pemasangan panel lengkap dengan peralatan bantu
b.1 PLP - LT1 1.00 unit 14,915,631.82 14,915,631.82
b.2 PP.AC-LT1 1.00 unit 10,959,646.82 10,959,646.82
1.c Pengadaan dan pemasangan kabel feeder lengkap dengan peralatan bantu
c.1 NYY 4x16 mm2 + BC 10 mm dari LVMDP ke PLP - LT1 Supreme (4 Besar) 120.00 m' 59,043.38 7,085,205.60
c.2 NYY 4x10 mm2 + BC 10 mm dari LVMDP ke PP.AC-LT1 Supreme (4 Besar) 120.00 m' 97,763.38 11,731,605.60
c.3 NYFGbY 4x10 mm2 + BC 10 mm2 dari LVMDP ke PP - Deep Well Pump Supreme (4 Besar) 60.00 m' 144,683.00 8,680,980.00
1.d Pengadaan dan pemasangan kabel tray dan kabel ladder tray lengkap dengan peralatan bantu
d.1 Kabel Tray 600x100x2400x1.2 mm Triabadi/setara 96.00 m' 419,941.50 40,314,384.00
d.2 Kabel Ladder tray 600x100x2400x1.2 mm Triabadi/setara 15.00 m' 463,501.50 6,952,522.50
d.3 Kabel Tray 300x100x2400x1.2 mm Triabadi/setara 23.00 m' 259,011.50 5,957,264.50
d.4 Elbow Kabel Tray 600x100x1.2 mm Triabadi/setara 7.00 bh 463,465.75 3,244,260.25
d.5 Tee Kabel Tray 600x300x100x1.2 mm Triabadi/setara 9.00 bh 413,855.75 3,724,701.75
1.e Pengadaan dan pemasangan armature penerangan dan peralatan
e.1 Down Light LED 9 Watt Ø4" Philips, Setara 26.00 bh 123,481.38 3,210,515.88
e.2 TL 2x36 Watt Philips, Setara 244.00 bh 60,561.38 14,776,976.72
e.3 Lampu Sorot LED 70 watt Philips, Setara 16.00 bh 1,191,911.38
e.4 Saklar tunggal Panasonic/setara 22.00 bh 42,614.17 937,511.74
e.5 Saklar ganda Panasonic/setara 31.00 bh 59,864.17 1,855,789.27
e.6 Stop kontak, inbow Panasonic/setara 42.00 bh 50,664.17 2,127,895.14
e.7 Stop kontak atas, outbow Panasonic/setara 34.00 bh 55,264.17 1,878,981.78
e.8 Stop kontak AC 220v/6A Panasonic/setara 34.00 bh 158,764.17 5,397,981.78
e.9 Instalasi penerangan lampu down Light LED 9 Watt NYY 3 x 2,5 mm2 Supreme (4 Besar) 26.00 titik 225,685.20 5,867,815.20
e.10 Instalasi penerangan lampu TL 2x36 Watt NYY 3 x 2,5 mm2 Supreme (4 Besar) 244.00 titik 225,685.20 55,067,188.80
e.11 Instalasi penerangan lampu Sorot 70 Watt NYY 3 x 2,5 mm2 Supreme (4 Besar) 16.00 titik 225,685.20 3,610,963.20
e.12 Instalasi stop kontak, inbow NYY 3 x 2,5 mm2 in conduit Supreme (4 Besar) 42.00 titik 176,281.20 7,403,810.40
e.13 Instalasi stop kontak atas, outbow NYM 3 x 2,5 mm2 in conduit Supreme (4 Besar) 34.00 titik 176,281.20 5,993,560.80
e.14 Instalasi stop kontak AC 220v/6A NYM 3 x 2,5 mm2 in conduit Supreme (4 Besar) 10.00 titik 176,281.20 1,762,812.00
e.15 Instalasi titik nyala exhaust fan NYM 3 x 2,5 mm2 in conduit Supreme (4 Besar) 62.00 titik 360,971.20 22,380,214.40
307,038,219.96
2 Pekerjaan CCTV
2.a Instalasi
Instalasi CCTV menggunakan Coaxial cable RG6 in PVC HI conduit dia.20mm &
a.1 5.00 titik 2,098,602.00 10,493,010.00
NYM 2 x 1.5 mm untuk kabel daya ke tiap camera
2.b Testing & Commissioning 1.00 ls 1,500,000.00 1,500,000.00
11,993,010.00
3 Pekerjaan HVAC System & Exhaust Fan
3.a Pengadaan dan pemasangan unit lengkap dengan aksesoris dan peralatan bantu
a.1 Exhaust fan type ceiling fan 125 cfm + material instalasi Panasonic/Setara 12.00 unit 606,804.44 7,281,653.28
a.2 Exhaust fan type ceiling wall 125 cfm + material instalasi Panasonic/Setara 50.00 unit 679,404.44 33,970,222.00
3.b Testing & Commissioning 1.00 ls 1,500,000.00 1,500,000.00
42,751,875.28
361,783,105.24
RENCANA ANGGARAN BIAYA

IV. PEKERJAAN MEKANIKAL PLUMBING


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI VOLUME SAT
(Rp) (Rp)
A LANTAI 1 (+0.00)
1 Pekerjaan Pemadam Kebakaran
1.a Peralatan utama
b.3 Pemadam Api Ringan (PAR) 3 kg, Co2 6.00 unit 721,855.86 4,331,135.16

2 Pekerjaan Plumbing
2.a Pekerjaan Peralatan Utama
a.1 PDAM
a Penyambungan pelanggan baru 1.00 ls 7,500,000.00
b Pompa air & instalasi pompa 1.00 ls 10,000,000.00
a.2 Tangki Air Fiber 2000 liter Excel 4.00 unit 2,800,000.00 11,200,000.00
a.3 Pekerjaan Sptictank
a) Pek. Galian pondasi 60.75 m3 96,998.00 5,892,628.50
b) Pek. Aerob Biofilter Septictank 15 m3 2.00 unit 25,000,000.00 -
c) Pek. Urugan kembali galian 18.225 m3 73,865.00 1,346,189.63
2.b Pekerjaan Pemipaan
b.2 Instalasi air bersih
a) Pipa PVC 2", Supply ke tangki Tipe AW Wavin/setara 140.00 m' 52,983.59 7,417,702.60
b) Pipa PVC 2", Supply dari tangki Tipe AW Wavin/setara 56.54 m' 52,983.59 2,995,692.18
c) Pipa PVC 1" Tipe AW Wavin/setara 329.00 m' 31,500.59 10,363,694.11
d) Pipa PVC 3/4" Tipe AW Wavin/setara 438.77 m' 27,110.22 11,895,149.04
b.3 Instalasi air kotor & bekas
a) Pipa PVC 3" Air kotor Tipe AW Wavin/setara 209.48 m' 90,706.72 19,001,242.66
b) Pipa PVC 3" Air bekas Tipe AW Wavin/setara 237.07 m' 90,706.72 21,503,840.93
c) Pipa PVC 2" Air Vent Tipe AW Wavin/setara 32.00 m' 52,983.59 1,695,474.88
b.4 Instalasi air hujan
a) Pipa PVC 4" Tipe AW Wavin/setara 89.00 m' 94,819.23 8,438,911.47
106,081,661.14
ANALISA HARGA SATUAN

1 Set dokumentasi menggunakan kamera digital


1.000 h.o Tukang Foto Rp 138,000.00 Rp. 138,000.00
Jumlah Upah Kerja . . Rp. 138,000.00
1.000 bh CD copy soft File foto image Rp 6500 Rp. 6,500.00
100.000 lbr Foto printing Rp 1000 Rp. 100,000.00
Jumlah Biaya Bahan . . Rp. 106,500.00
Rp. 244,500.00
Overhead + Profit (10%) Rp. 24,450.00
Jumlah Total Rp. 268,950.00
1 Set Pengadaan & Penggandaan laporan
0.080 h.o Operator printer Rp 138,000.00 Rp. 11,040.00
Jumlah Upah Kerja . . Rp. 11,040.00
50.000 lbr Kertas HVS Rp 200.00 Rp. 10,000.00
0.500 set Tinta printer Rp 45,000.00 Rp. 22,500.00
200.000 lbr Foto copy Rp 250.00 Rp. 50,000.00
4.000 bh Menjilid Rp 10,000.00 Rp. 40,000.00
Jumlah Biaya Bahan . . Rp. 122,500.00
Rp. 133,540.00
Overhead + Profit (10%) Rp. 13,354.00
Jumlah Total Rp. 146,894.00

Pek. Administrasi & Dokumentasi


20.000mingguDokumentasi Rp 268,950.00 Rp 5,379,000.00
20.000mingguLaporan Rp 146,894.00 Rp 2,937,880.00
Jumlah Biaya Bahan . . Rp. 8,316,880.00
Overhead + Profit (10%) Rp. 537,900.00
Jumlah Total Rp. 8,854,780.00

1 m' Pagar sementara dari seng gelombang tinggi 2 meter


0.400 h.o Pekerja Rp 118,000.00 Rp. 47,200.00
0.200 h.o Tukang kayu Rp 138,000.00 Rp. 27,600.00
0.020 h.o Kepala tukang Rp 143,000.00 Rp. 2,860.00
0.020 h.o Mandor Rp 163,000.00 Rp. 3,260.00
Jumlah Upah Kerja . . Rp. 80,920.00
1.250 btg Dolken kayu dia. 8 - 10/400 cm Rp 60,000.00 Rp. 75,000.00
0.060 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 1,200.00
1.200 lbr Seng Gelombang 180 x 90 x 5 BJLS 30 Rp 58,000.00 Rp. 69,600.00
0.450 kg Meni besi Rp 35,000.00 Rp. 15,750.00
0.012 m³ Kayu Kelas III Rp 2,085,000.00 Rp. 25,020.00
2.000 m² Banner Rp 28,000.00 Rp. 56,000.00
Jumlah Biaya Bahan . . Rp. 242,570.00
Rp. 323,490.00
Overhead + Profit (10%) Rp. 32,349.00
Jumlah Total Rp. 355,839.00

1 m² Pembuatan Direksi keet


1.000 h.o Pekerja Rp 118,000.00 Rp. 118,000.00
2.000 h.o Tukang Rp 138,000.00 Rp. 276,000.00
0.200 h.o Kepala tukang Rp 143,000.00 Rp. 28,600.00
0.050 h.o Mandor Rp 163,000.00 Rp. 8,150.00
Jumlah Upah Kerja . . Rp. 430,750.00
1.250 btg Dolken kayu dia. 8 - 10/400 cm Rp 60,000.00 Rp. 75,000.00
0.186 m³ Kayu Kelas III Rp 2,085,000.00 Rp. 387,810.00
0.300 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 6,000.00
0.360 sak Semen portland 50 kg Rp 58,000.00 Rp. 20,880.00
0.030 m³ Pasir beton Rp 165,000.00 Rp. 4,950.00
0.050 m³ Batu Koral / kerikil uk. 1-2 cm Rp 250,000.00 Rp. 12,500.00
1.500 lbr Seng Gelombang 180 x 90 x 5 BJLS 30 Rp 58,000.00 Rp. 87,000.00
1.350 lbr Multripleks 3 mm uk. 122 x 244 Rp 53,500.00 Rp. 72,225.00
Jumlah Biaya Bahan . . Rp. 666,365.00
Rp. 1,097,115.00
Overhead + Profit (10%) Rp. 109,711.50
Jumlah Total Rp. 1,206,826.50

1 m² Gudang dan barak pekerja


0.100 h.o Pekerja Rp 118,000.00 Rp. 11,800.00
1.000 h.o Tukang Rp 138,000.00 Rp. 138,000.00
0.500 h.o Kepala tukang Rp 143,000.00 Rp. 71,500.00
0.005 h.o Mandor Rp 163,000.00 Rp. 815.00
Jumlah Upah Kerja . . Rp. 222,115.00
0.020 m³ Papan kayu Kelas III Rp 2,182,000.00 Rp. 43,640.00
0.050 m³ Batu pecah Rp 260,000.00 Rp. 13,000.00
0.030 m³ Pasir beton Rp 165,000.00 Rp. 4,950.00
1.000 sak Semen portland 50 kg Rp 58,000.00 Rp. 58,000.00
0.300 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 6,000.00
1.200 lbr Seng Gelombang 180 x 90 x 5 BJLS 30 Rp 58,000.00 Rp. 69,600.00
0.180 lbr Multripleks 9 mm uk. 122 x 244 Rp 130,000.00 Rp. 23,400.00
Jumlah Biaya Bahan . . Rp. 218,590.00
Rp. 440,705.00
Overhead + Profit (10%) Rp. 44,070.50
Jumlah Total Rp. 484,775.50

Keselamatan dan kesehatan kerja (K3)


20.000 bh Savety helmet Rp 45,000.00 Rp. 900,000.00
10.000 set Harness Full body Rp 250,000.00 Rp. 2,500,000.00
15.000 bh Savety jacket Rp 55,000.00 Rp. 825,000.00
10.000 bh Savety Google Rp 50,000.00 Rp. 500,000.00
10.000 psg Savety Shoes Rp 345,000.00 Rp. 3,450,000.00
10.000 bh Masker Rp 25,000.00 Rp. 250,000.00
15.000 psg Sarung tangan Rp 15,000.00 Rp. 225,000.00
5.000 bh Poster keselamatan Rp 65,000.00 Rp. 325,000.00
2.000 set First Aid Kit Rp 350,000.00 Rp. 700,000.00
2.000 bh Papan pengumuman K3 Rp 250,000.00 Rp. 500,000.00
1.000 ls Asuransi Rp 5,200,000.00 Rp. 5,200,000.00
Jumlah Total Rp. 15,375,000.00
Overhead + Profit (10%) Rp. 1,537,500.00
Jumlah Total Rp. ###

1 bh Papan nama proyek 80x120 cm


2.100 h.o Pekerja Rp 118,000.00 Rp. 247,800.00
0.018 h.o Tukang Batu Rp 138,000.00 Rp. 2,415.00
1.000 h.o Tukang Kayu Rp 138,000.00 Rp. 138,000.00
1.000 h.o Tukang Cat Rp 138,000.00 Rp. 138,000.00
1.005 h.o Mandor Rp 163,000.00 Rp. 163,815.00
Jumlah Upah Kerja . . Rp. 690,030.00
0.035 m³ Kayu kelas III Rp 2,085,000.00 Rp. 72,975.00
1.400 m' Plat seng tebal 0.050 cm lebar 0.90m Rp 48,000.00 Rp. 67,200.00
0.600 kg Paku Rp 20,000.00 Rp. 12,000.00
1.500 kg Cat Kayu Rp 56,000.00 Rp. 84,000.00
0.336 sak Semen PC Rp 58,000.00 Rp. 19,488.00
0.027 m³ Pasir beton Rp 165,000.00 Rp. 4,455.00
0.041 m³ Koral/krikil Rp 250,000.00 Rp. 10,125.00
Jumlah Biaya Bahan . . Rp. 270,243.00
Rp. 960,273.00
Overhead + Profit (10%) Rp. 96,027.30
Jumlah Total Rp. 1,056,300.30

1 m3 Galian tanah biasa sedalam 1 meter


0.500 h.o pekerja Rp 118,000.00 Rp. 59,000.00
0.050 ho mandor Rp 163,000.00 Rp. 8,150.00
. . Rp. 67,150.00
Overhead + Profit (10%) Rp. 6,715.00
Jumlah Total Rp. 73,865.00
1 m3 Galian tanah biasa sedalam 2 meter
0.658 h.o pekerja Rp 118,000.00 Rp. 77,585.00
0.065 h.o mandor Rp 163,000.00 Rp. 10,595.00
Jumlah Total . . Rp. 88,180.00
Overhead + Profit (10%) Rp. 8,818.00
Jumlah Total Rp. 96,998.00

1 m3 Galian tanah biasa sedalam 3 meter


0.919 h.o pekerja Rp 118,000.00 Rp. 108,412.50
0.091 h.o mandor Rp 163,000.00 Rp. 14,873.75
Jumlah Total . . Rp. 123,286.25
Overhead + Profit (10%) Rp. 12,328.63
Jumlah Total Rp. 135,614.88

1 m3 Urugan pasir
0.300 h.o pekerja Rp 118,000.00 Rp. 35,400.00
0.010 h.o mandor Rp 163,000.00 Rp. 1,630.00
Jumlah Upah Kerja . . Rp. 37,030.00
1.200 m3 pasir urug Rp 84,000.00 Rp. 100,800.00
Jumlah Biaya Bahan . . Rp. 100,800.00
Rp. 137,830.00
Overhead + Profit (10%) Rp. 13,783.00
Jumlah Total Rp. 151,613.00

1 m3 Urugan sirtu
0.250 h.o pekerja Rp 118,000.00 Rp. 29,500.00
0.025 h.o mandor Rp 163,000.00 Rp. 4,075.00
Jumlah Upah Kerja . . Rp. 33,575.00
1.200 m3 sirtu Rp 116,000.00 Rp. 139,200.00
Jumlah Biaya Bahan . . Rp. 139,200.00
Rp. 172,775.00
Overhead + Profit (10%) Rp. 17,277.50
Jumlah Total Rp. 190,052.50

1m3 Urugan kembali


0.500 h.o pekerja Rp 118,000.00 Rp. 59,000.00
0.050 h.o mandor Rp 163,000.00 Rp. 8,150.00
Jumlah Total . . Rp. 67,150.00
Overhead + Profit (10%) Rp. 6,715.00
Jumlah Total Rp. 73,865.00

1 m2 Pemasangan paving block


0.148 h.o pekerja Rp 118,000.00 Rp. 17,464.00
0.296 h.o tukang paving Rp 138,000.00 Rp. 40,848.00
0.030 h.o kepala tukang Rp 143,000.00 Rp. 4,232.80
0.007 h.o mandor Rp 163,000.00 Rp. 1,206.20
Jumlah Upah Kerja . . Rp. 63,751.00
1.000 m2 Paving block K- 225 Rp 77,000.00 Rp. 77,000.00
0.060 m3 Pasir urug tebal padat 5cm Rp 84,000.00 Rp. 5,040.00
Jumlah Biaya Bahan . . Rp. 82,040.00
0.020 h.a Sewa Tamper/Baby roller Rp 2,500,000.00 Rp. 50,000.00
Jumlah Biaya Peralatan . . Rp. 50,000.00
Jumlah total Rp. 195,791.00
Overhead + Profit (10%) Rp. 19,579.10
Jumlah Total Rp. 215,370.10

1 m2 Pemasangan paving block


0.148 h.o pekerja Rp 118,000.00 Rp. 17,464.00
0.296 h.o tukang paving Rp 138,000.00 Rp. 40,848.00
0.030 h.o kepala tukang Rp 143,000.00 Rp. 4,232.80
0.007 h.o mandor Rp 163,000.00 Rp. 1,206.20
Jumlah Upah Kerja . . Rp. 63,751.00
1.000 m2 Paving block K- 300 Rp 93,500.00 Rp. 93,500.00
0.060 m3 Pasir urug tebal padat 5cm Rp 84,000.00 Rp. 5,040.00
Jumlah Biaya Bahan . . Rp. 98,540.00
0.020 h.a Sewa Tamper/Baby roller Rp 2,500,000.00 Rp. 50,000.00
Jumlah Biaya Peralatan . . Rp. -
Jumlah total Rp. 162,291.00
Overhead + Profit (10%) Rp. -
Jumlah Total Rp. 162,291.00

1 m' Pasang Kansteen beton


0.100 h.o Pekerja Rp 118,000.00 Rp. 11,800.00
0.150 h.o Tukang batu Rp 138,000.00 Rp. 20,700.00
0.050 h.o Kepala tukang Rp 143,000.00 Rp. 7,150.00
0.010 h.o Mandor Rp 163,000.00 Rp. 1,630.00
Jumlah Upah Kerja . . Rp. 41,280.00
2.500 bh Kansteen Rp 33,000.00 Rp. 82,500.00
0.050 m3 Pasir pasang Rp 165,000.00 Rp. 8,250.00
0.251 zak Semen Rp 58,000.00 Rp. 14,558.00
Jumlah Biaya Bahan . . Rp. 105,308.00
. . Rp. 146,588.00
Overhead + Profit (10%) Rp. 14,658.80
Jumlah Total Rp. 161,246.80

1 m' Pengukuran dan pemasangan bouwplank


0.100 h.o pekerja Rp 118,000.00 Rp. 11,800.00
0.100 h.o tukang kayu Rp 138,000.00 Rp. 13,800.00
0.010 h.o kepala tukang Rp 143,000.00 Rp. 1,430.00
0.005 h.o mandor Rp 163,000.00 Rp. 815.00
Jumlah Upah Kerja . . Rp. 27,845.00
0.012 m3 Kayu 5/7 Rp 45,000.00 Rp. 540.00
0.020 kg Paku biasa 2"-5" Rp 20,000.00 Rp. 400.00
0.007 m3 Kayu papan 3/20 Rp 2,182,000.00 Rp. 15,274.00
Jumlah Biaya Bahan . . Rp. 16,214.00
. . Rp. 44,059.00
Overhead + Profit (10%) Rp. 4,405.90
Jumlah Total Rp. 48,464.90

1 m3 Pasang kusen pintu dan jendela kayu


6.000 h.o pekerja Rp 118,000.00 Rp 708,000.00
18.000 h.o tukang kayu Rp 138,000.00 Rp 2,484,000.00
2.000 h.o kepala tukang Rp 143,000.00 Rp 286,000.00
0.300 h.o mandor Rp 163,000.00 Rp 48,900.00
Jumlah Upah Kerja . . Rp. 3,526,900.00

1.200 m3 Kayu kelas I, balok Rp 9,000,000.00 Rp. 10,800,000.00


Jumlah Biaya Bahan . . Rp. 10,800,000.00
. . Rp. 14,326,900.00
Overhead + Profit (10%) Rp. 1,432,690.00
Jumlah Total Rp. ###

1 m2 Pasang pintu klamp kayu


0.350 h.o pekerja Rp 118,000.00 Rp. 41,300.00
1.050 h.o tukang kayu Rp 138,000.00 Rp. 144,900.00
0.105 h.o kepala tukang Rp 143,000.00 Rp. 15,015.00
0.018 h.o mandor Rp 163,000.00 Rp. 2,934.00
Jumlah Upah Kerja . . Rp. 204,149.00
0.036 m3 Papan kayu kelas I Rp 13,100,000.00 Rp. 471,600.00
0.050 kg Paku biasa 2"-5" Rp 20,000.00 Rp. 1,000.00
Jumlah Biaya Bahan . . Rp. 472,600.00
. . Rp. 676,749.00
Overhead + Profit (10%) Rp. 67,674.90
Jumlah Total Rp. 744,423.90

1 m2 Pasang pintu panil kayu


1.000 h.o pekerja Rp 118,000.00 Rp. 118,000.00
2.500 h.o tukang kayu Rp 138,000.00 Rp. 345,000.00
0.250 h.o kepala tukang Rp 143,000.00 Rp. 35,750.00
0.050 h.o mandor Rp 163,000.00 Rp. 8,150.00
Jumlah Upah Kerja . . Rp. 506,900.00
0.040 m3 Papan kayu kelas I Rp 13,100,000.00 Rp. 524,000.00
Jumlah Biaya Bahan . . Rp. 524,000.00
Jumlah Total . . Rp. 1,030,900.00

1 m2 Pasang pintu plywood/teakwood/triplek rangkap, rangka kayu


0.700 h.o pekerja Rp 118,000.00 Rp. 82,600.00
2.100 h.o tukang kayu Rp 138,000.00 Rp. 289,800.00
0.210 h.o kepala tukang Rp 143,000.00 Rp. 30,030.00
0.035 h.o mandor Rp 163,000.00 Rp. 5,705.00
Jumlah Upah Kerja . . Rp. 408,135.00
0.025 m3 Papan kayu kelas I Rp 13,100,000.00 Rp. 327,500.00
0.030 kg Paku biasa 1/2" - 1" Rp 20,000.00 Rp. 600.00
0.500 ltr Lem kayu Rp 28,000.00 Rp. 14,000.00
1.000 lbr Plywood/teakwood/triplek 4' x 3' x 4mm Rp 65,000.00 Rp. 65,000.00
Jumlah Biaya Bahan . . Rp. 407,100.00
. . Rp. 815,235.00
Overhead + Profit (10%) Rp. 81,523.50
Jumlah Total Rp. 896,758.50

1 m2 Pasang HPL
0.170 h.o Pekerja Rp 118,000.00 Rp. 20,060.00
0.170 h.o Tukang Rp 138,000.00 Rp. 23,460.00
0.017 h.o Kepala tukang Rp 143,000.00 Rp. 2,431.00
0.009 h.o Mandor Rp 163,000.00 Rp. 1,385.50
Jumlah Upah Kerja . Rp. 47,336.50
1.000 m2 HPL Rp 61,475.41 Rp. 61,475.41
0.350 kg Lem vinyl Rp 28,000.00 Rp. 9,800.00
Jumlah Biaya Bahan . Rp. 71,275.41
. Rp. 118,611.91
Overhead + Profit (10%) Rp. 11,861.19
Jumlah Total Rp. 130,473.10

1 m2 Pasang Alucopan 0.21 (4) mm


1.0000 h.o Pekerja Rp 118,000.00 Rp. 118,000.00
0.7500 h.o Tukang aluminium Rp 138,000.00 Rp. 103,500.00
0.0750 h.o Kepala tukang Rp 143,000.00 Rp. 10,725.00
0.0075 h.o Mandor Rp 163,000.00 Rp. 1,222.50
Jumlah Upah Kerja ..... Rp. 233,447.50
1.0500 m2 Alucopan 0.21 (4) mm Polyester Rp 145,726.96 Rp. 153,013.30
1.6000 m' Alumunium Stifner panel Rp 75,000.00 Rp. 120,000.00
1.4000 m' Alumunium. Siku 30x16 Rp 75,000.00 Rp. 105,000.00
4.0250 m' Hollow 40x40x2 mm Rp 22,500.00 Rp. 90,562.50
2.1000 kg Bracket besi siku 70.70.7 Rp 12,000.00 Rp. 25,200.00
2.0000 bh Dynabolt M 10 x 120 Rp 5,000.00 Rp. 10,000.00
2.0000 bh Mur + baut M 10 x 70 Rp 2,031.00 Rp. 4,062.00
0.0667 kg Zincromate Rp 50,000.00 Rp. 3,333.33
0.2500 tube Sealant Rp 105,000.00 Rp. 26,250.00
12.0000 bh Ramsel Nails Rp 5,000.00 Rp. 60,000.00
Jumlah Biaya Bahan ..... Rp. 597,421.14
..... Rp. 830,868.64
Overhead + Profit (10%) Rp. 41,543.43
Jumlah Total Rp. 872,412.07

1 m² Pasang aluminium perforated


0.080 h.o Pekerja Rp 118,000.00 Rp. 9,440.00
0.800 h.o Tukang Rp 138,000.00 Rp. 110,400.00
0.080 h.o Kepala Tukang Rp 143,000.00 Rp. 11,440.00
0.004 h.o Mandor Rp 163,000.00 Rp. 652.00
Jumlah Upah Kerja ..... Rp. 131,932.00
1.2000 m2 aluminium perforated Rp 413,380.00 Rp. 496,056.00
Jumlah Biaya Bahan ..... Rp. 496,056.00
..... Rp. 627,988.00
Overhead + Profit (10%) Rp. 62,798.80
Jumlah Total Rp. 690,786.80

1 m2 Pasang pintu dan jendela kaca


0.800 h.o pekerja Rp 118,000.00 Rp 94,400.00
2.000 h.o tukang kayu Rp 138,000.00 Rp 276,000.00
0.200 h.o kepala tukang Rp 143,000.00 Rp 28,600.00
0.040 h.o mandor Rp 163,000.00 Rp 6,520.00
Jumlah Upah Kerja . . Rp. 405,520.00
0.035 m3 Papan kayu kelas I Rp 13,100,000.00 Rp 458,500.00
Jumlah Biaya Bahan . . Rp 458,500.00
. . Rp. 864,020.00
Overhead + Profit (10%) Rp. 86,402.00
Jumlah Total Rp. 950,422.00

1 m2 Pasang Jaluzi/ ventilasi mati kusen kayu


0.500 h.o pekerja Rp 118,000.00 Rp. 59,000.00
2.000 h.o tukang kayu Rp 138,000.00 Rp. 276,000.00
0.200 h.o kepala tukang Rp 143,000.00 Rp. 28,600.00
0.025 h.o mandor Rp 163,000.00 Rp. 4,075.00
Jumlah Upah Kerja . . Rp. 367,675.00
0.060 m3 Papan kayu kelas I Rp 13,100,000.00 Rp. 786,000.00
0.150 kg Paku biasa 1/2" - 1" Rp 20,000.00 Rp. 3,000.00
Jumlah Biaya Bahan . . Rp 789,000.00
. . Rp. 1,156,675.00
Overhead + Profit (10%) Rp. 115,667.50
Jumlah Total Rp. 1,272,342.50

1 m2 Pasang pintu dan jendela Jaluzi kayu


1.000 h.o pekerja Rp 118,000.00 Rp. 118,000.00
3.000 h.o tukang kayu Rp 138,000.00 Rp. 414,000.00
0.300 h.o kepala tukang Rp 143,000.00 Rp. 42,900.00
0.300 h.o mandor Rp 163,000.00 Rp. 48,900.00
Jumlah Upah Kerja . . Rp. 623,800.00
0.064 m3 Papan kayu kelas I Rp 13,100,000.00 Rp. 838,400.00
Jumlah Biaya Bahan . . Rp 838,400.00
. . Rp. 1,462,200.00
Overhead + Profit (10%) Rp. 146,220.00
Jumlah Total Rp. 1,608,420.00

1 m2 Pasang kayu rangka plafon (1 x 1) m


0.012 m3 balok kayu kelas I Rp 9,000,000.00 Rp. 108,000.00
0.100 kg paku 2" - 5" Rp 20,000.00 Rp. 2,000.00
Jumlah Upah Kerja . . Rp. 110,000.00
0.150 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.250 h.o tukang kayu Rp 138,000.00 Rp. 34,500.00
0.025 h.o kepala tukang Rp 143,000.00 Rp. 3,575.00
0.075 h.o mandor Rp 163,000.00 Rp. 12,225.00
Jumlah Biaya Bahan . . Rp. 68,000.00
. . Rp. 178,000.00
Overhead + Profit (10%) Rp. 17,800.00
Jumlah Total Rp. 195,800.00

1 m2 Pasang plafon kalsiboard


0.030 h.o Pekerja Rp 118,000.00 Rp. 3,540.00
0.070 h.o Tukang kayu Rp 138,000.00 Rp. 9,660.00
0.007 h.o Kepala tukang Rp 143,000.00 Rp. 1,001.00
0.002 h.o mandor Rp 163,000.00 Rp. 244.50
Jumlah Upah Kerja . . Rp. 14,445.50
1.100 lbr kalsiboard tebal 0,4 cm Rp 135,000.00 Rp. 148,500.00
0.010 kg paku 1/2" - 1" Rp 45,000.00 Rp. 450.00
Jumlah Biaya Bahan . . Rp. 148,950.00
. . Rp. 163,395.50
Overhead + Profit (10%) Rp. 16,339.55
Jumlah Total Rp. 179,735.05

1 m2 Pasang plafon Gypsum


0.100 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.050 h.o tukang kayu Rp 138,000.00 Rp 6,900.00
0.005 h.o kepala tukang Rp 143,000.00 Rp 715.00
0.005 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . Rp. 20,230.00
0.364 lbr Papan gypsum (120x240x9) mm Rp 66,000.00 Rp 24,024.00
0.110 kg paku sekrup Rp 45,000.00 Rp 4,950.00
Jumlah Biaya Bahan . . Rp. 28,974.00
Jumlah Total . . Rp. 49,204.00
Overhead + Profit (10%) Rp. 4,920.40
Jumlah Total Rp. 54,124.40

1 m' Pasang list plafon kayu profil


0.050 h.o pekerja Rp 118,000.00 Rp 5,900.00
0.050 h.o tukang kayu Rp 138,000.00 Rp 6,900.00
0.005 h.o kepala tukang Rp 143,000.00 Rp 715.00
0.003 h.o mandor Rp 163,000.00 Rp 489.00
Jumlah Upah Kerja . . Rp. 14,004.00
1.100 m' Kayu profil Rp 25,000.00 Rp 27,500.00
0.010 kg Paku Rp 20,000.00 Rp 200.00
Jumlah Biaya Bahan . . Rp. 27,700.00
. . Rp. 41,704.00
Overhead + Profit (10%) Rp. 4,170.40
Jumlah Total Rp. 45,874.40

1 m' Pasang lisplang ukuran (3 x 20) cm


0.100 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.200 h.o tukang kayu Rp 138,000.00 Rp 27,600.00
0.020 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.005 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . Rp. 43,075.00
0.007 m3 Papan kayu 3x20 kelas I Rp 13,100,000.00 Rp 94,320.00
0.050 kg Paku biasa 2" - 5" Rp 20,000.00 Rp 1,000.00
Jumlah Biaya Bahan . . Rp. 95,320.00
. . Rp. 138,395.00
Overhead + Profit (10%) Rp. 13,839.50
Jumlah Total Rp. 152,234.50

1 m' Pasang lisplang ukuran (3 x 30) cm


0.110 h.o pekerja Rp 118,000.00 Rp 12,980.00
0.220 h.o tukang kayu Rp 138,000.00 Rp 30,360.00
0.022 h.o kepala tukang Rp 143,000.00 Rp 3,146.00
0.005 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . Rp. 47,301.00
0.011 m3 Papan kayu 3x30 kelas I Rp 13,100,000.00 Rp 144,100.00
0.050 kg Paku biasa 2" - 5" Rp 20,000.00 Rp 1,000.00
Jumlah Biaya Bahan . . Rp. 145,100.00
. . Rp. 192,401.00
Overhead + Profit (10%) Rp. 19,240.10
Jumlah Total Rp. 211,641.10

1 m2 Pasang rangka dinding sekat kayu


0.150 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.450 h.o tukang kayu Rp 138,000.00 Rp 62,100.00
0.045 h.o kepala tukang Rp 143,000.00 Rp 6,435.00
0.075 h.o mandor Rp 163,000.00 Rp 12,225.00
Jumlah Upah Kerja . . Rp. 98,460.00
0.007 m3 Papan kayu kelas I Rp 13,100,000.00 Rp 91,700.00
0.020 m3 Balok kayu kelas I Rp 9,000,000.00 Rp 175,500.00
0.100 kg Paku biasa 2" - 5" Rp 20,000.00 Rp 2,000.00
Jumlah Biaya Bahan . . Rp. 269,200.00
Jumlah Total . . Rp. 367,660.00
Overhead + Profit (10%) Rp. 36,766.00
Jumlah Total Rp. 404,426.00

1 m2 Pasang dinding sekat plywood/teakwood/triplek rangkap, rangka kayu


0.200 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.600 h.o tukang kayu Rp 138,000.00 Rp 82,800.00
0.060 h.o kepala tukang Rp 143,000.00 Rp 8,580.00
0.010 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . Rp. 116,610.00
0.007 m3 Papan kayu kelas I Rp 13,100,000.00 Rp 91,700.00
0.020 m3 Balok kayu kelas I Rp 9,000,000.00 Rp 175,500.00
0.560 ltr Lem kayu Rp 28,000.00 Rp 15,680.00
1.000 lbr Plywood/teakwood/triplek 4' x 8' x … mm Rp 30,396.17 Rp 30,396.17
0.100 kg Paku biasa 2" - 5" Rp 20,000.00 Rp 2,000.00
Jumlah Biaya Bahan . . Rp. 315,276.17
. . Rp. 431,886.17
Overhead + Profit (10%) Rp. 43,188.62
Jumlah Total Rp. 475,074.79

1 m2 Pasang plywood/triplek tebal 4 mm untuk dinding


0.025 h.o pekerja Rp 118,000.00 Rp 2,950.00
0.075 h.o tukang kayu Rp 138,000.00 Rp 10,350.00
0.008 h.o kepala tukang Rp 143,000.00 Rp 1,072.50
0.001 h.o mandor Rp 163,000.00 Rp 211.90
Jumlah Upah Kerja . . Rp. 14,584.40
0.400 lbr Plywood/triplek 4' x 8' x 4mm Rp 30,396.17 Rp 12,158.47
0.050 kg Paku biasa 2" - 5" Rp 20,000.00 Rp 1,000.00
Jumlah Biaya Bahan . . Rp. 13,158.47
. . Rp. 27,742.87
Overhead + Profit (10%) Rp. 2,774.29
Jumlah Total Rp. 30,517.16

1 m2 Pasang dinding partisi gypsum 12 mm


0.550 h.o Pekerja Rp 118,000.00 Rp 64,900.00
0.275 h.o Tukang kayu Rp 138,000.00 Rp 37,950.00
0.040 h.o Kepala tukang Rp 143,000.00 Rp 5,720.00
0.025 h.o Mandor Rp 163,000.00 Rp 4,075.00
Jumlah Upah Kerja ..... . Rp. 112,645.00
0.450 lbr Gypsum 12mm Rp 90,900.00 Rp 40,905.00
0.220 kg Paku Sekrup Rp 45,000.00 Rp 9,900.00
0.032 roll Plester sambungan gypsum Rp 74,415.00 Rp 2,381.28
0.600 kg Compound gypsum Rp 5,021.00 Rp 3,012.60
1.000 lbr Kertas gosok Rp 7,000.00 Rp 7,000.00
3.520 m' Baja Ringan 36x75 mm Rp 16,226.50 Rp 57,117.28
6.000 bh Ramsel Nails Rp 5,100.00 Rp 30,600.00
Jumlah Biaya Bahan ..... . Rp. 150,916.16
. Rp. 153,928.76
Overhead + Profit (10%) Rp. 15,392.88
Jumlah Total Rp. 169,321.64

1 m2 Pasang Begisting untuk pondasi


0.520 h.o pekerja Rp 118,000.00 Rp. 61,360.00
0.260 h.o tukang kayu Rp 138,000.00 Rp. 35,880.00
0.026 h.o kepala tukang Rp 143,000.00 Rp. 3,718.00
0.026 h.o mandor Rp 163,000.00 Rp. 4,238.00
Jumlah Upah Kerja . . Rp. 105,196.00
0.020 m3 Papan kayu Rp 2,182,000.00 Rp. 43,640.00
0.300 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 6,000.00
0.100 ltr Minyak bekisting Rp 45,000.00 Rp. 4,500.00
Jumlah Biaya Bahan . . Rp 54,140.00
. . Rp. 159,336.00
Overhead + Profit (10%) Rp. 15,933.60
Jumlah Total Rp. 175,269.60

1 m2 Pasang Begisting untuk sloof


0.300 h.o pekerja Rp 118,000.00 Rp. 35,400.00
0.260 h.o tukang kayu Rp 138,000.00 Rp. 35,880.00
0.026 h.o kepala tukang Rp 143,000.00 Rp. 3,718.00
0.005 h.o mandor Rp 163,000.00 Rp. 815.00
Jumlah Upah Kerja . . Rp. 75,813.00
0.023 m3 Papan kayu Rp 2,182,000.00 Rp. 49,095.00
0.300 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 6,000.00
0.100 ltr Minyak bekisting Rp 45,000.00 Rp. 4,500.00
Jumlah Biaya Bahan . . Rp 59,595.00

. . Rp. 135,408.00
Overhead + Profit (10%) Rp. 13,540.80
Jumlah Total Rp. 148,948.80

1 m2 Pasang Begisting untuk kolom


0.660 h.o pekerja Rp 118,000.00 Rp. 77,880.00
0.330 h.o tukang kayu Rp 138,000.00 Rp. 45,540.00
0.033 h.o kepala tukang Rp 143,000.00 Rp. 4,719.00
0.033 h.o mandor Rp 163,000.00 Rp. 5,379.00
Jumlah Upah Kerja . . Rp. 133,518.00
0.020 m3 Papan kayu Rp 2,182,000.00 Rp. 43,640.00
0.400 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 8,000.00
0.008 m3 Balok kayu Kls II Rp 3,250,000.00 Rp. 24,375.00
0.175 lbr Plywood tebal 9 mm Rp 90,000.00 Rp. 15,750.00
1.000 btg Dolken kayu galam f 8 - 10/4 m Rp 60,000.00 Rp. 60,000.00
0.200 ltr Minyak bekisting Rp 45,000.00 Rp. 9,000.00
Jumlah Biaya Bahan . . Rp 160,765.00
. . Rp. 294,283.00
Overhead + Profit (10%) Rp. 29,428.30
Jumlah Total Rp. 323,711.30

1 m2 Pasang Begisting untuk balok


0.320 h.o pekerja Rp 118,000.00 Rp. 37,760.00
0.330 h.o tukang kayu Rp 138,000.00 Rp. 45,540.00
0.033 h.o kepala tukang Rp 143,000.00 Rp. 4,719.00
0.006 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . Rp. 88,997.00
0.020 m3 Papan kayu Rp 2,182,000.00 Rp. 43,640.00
0.400 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 8,000.00
0.009 m3 Balok kayu Rp 3,250,000.00 Rp. 29,250.00
0.175 lbr Plywood tebal 9 mm Rp 90,000.00 Rp. 15,750.00
1.000 btg Dolken kayu galam f 8 - 10/4 m Rp 60,000.00 Rp. 60,000.00
0.200 ltr Minyak bekisting Rp 45,000.00 Rp. 9,000.00
Jumlah Biaya Bahan . . Rp 165,640.00
. . Rp. 254,637.00
Overhead + Profit (10%) Rp. 25,463.70
Jumlah Total Rp. 280,100.70

1 m2 Pasang Begisting untuk lantai/pelat


0.320 h.o pekerja Rp 118,000.00 Rp. 37,760.00
0.330 h.o tukang kayu Rp 138,000.00 Rp. 45,540.00
0.033 h.o kepala tukang Rp 143,000.00 Rp. 4,719.00
0.006 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . Rp. 88,997.00
0.020 m3 Papan kayu Rp 2,182,000.00 Rp. 43,640.00
0.400 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 8,000.00
0.008 m3 Balok kayu Rp 3,250,000.00 Rp. 24,375.00
0.175 lbr Plywood tebal 9 mm Rp 90,000.00 Rp. 15,750.00
4.000 btg Dolken kayu galam f 8 - 10/4 m Rp 60,000.00 Rp. 240,000.00
0.200 ltr Minyak bekisting Rp 45,000.00 Rp. 9,000.00
Jumlah Biaya Bahan . . Rp 340,765.00
. . Rp. 429,762.00
Overhead + Profit (10%) Rp. 42,976.20
Jumlah Total Rp. 472,738.20

1 m2 Pasang Begisting untuk dinding


0.320 h.o pekerja Rp 118,000.00 Rp. 37,760.00
0.330 h.o tukang kayu Rp 138,000.00 Rp. 45,540.00
0.033 h.o kepala tukang Rp 143,000.00 Rp. 4,719.00
0.006 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . Rp. 88,997.00
0.030 m3 Papan kayu Rp 2,182,000.00 Rp. 65,460.00
0.400 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 8,000.00
0.020 m3 Balok kayu Rp 3,250,000.00 Rp. 65,000.00
0.350 lbr Plywood tebal 9 mm Rp 90,000.00 Rp. 31,500.00
3.000 btg Dolken kayu galam f 8 - 10/4 m Rp 60,000.00 Rp. 180,000.00
4.000 bh Formtie/penjaga jarak begisting Rp 15,000.00 Rp. 60,000.00
0.200 ltr Minyak bekisting Rp 45,000.00 Rp. 9,000.00
Jumlah Biaya Bahan . . Rp 418,960.00
. . Rp. 507,957.00
Overhead + Profit (10%) Rp. 50,795.70
Jumlah Total Rp. 558,752.70

1 m2 Pasang Begisting untuk tangga


0.320 h.o pekerja Rp 118,000.00 Rp. 37,760.00
0.330 h.o tukang kayu Rp 138,000.00 Rp. 45,540.00
0.033 h.o kepala tukang Rp 143,000.00 Rp. 4,719.00
0.006 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . Rp. 88,997.00
0.030 m3 Papan kayu Rp 2,182,000.00 Rp. 65,460.00
0.400 kg Paku biasa 2" - 5" Rp 20,000.00 Rp. 8,000.00
0.015 m3 Balok kayu Rp 3,250,000.00 Rp. 48,750.00
0.350 lbr Plywood tebal 9 mm Rp 90,000.00 Rp. 31,500.00
2.000 btg Dolken kayu galam f 8 - 10/4 m Rp 60,000.00 Rp. 120,000.00
0.150 ltr Minyak bekisting Rp 45,000.00 Rp. 6,750.00
Jumlah Biaya Bahan . . Rp 280,460.00
. . Rp. 369,457.00
Overhead + Profit (10%) Rp. 36,945.70
Jumlah Total Rp. 406,402.70

1 m2 Pasang begisting batako 6x12x24 untuk pondasi


0.320 h.o Pekerja Rp 118,000.00 Rp. 37,760.00
0.100 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.010 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.015 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . Rp. 55,435.00
23.810 bh Batako Rp 1,750.00 41,666.67
0.150 zak Semen portland 50 kg Rp 58,000.00 8,700.00
0.027 m3 Pasir pasang Rp 165,000.00 4,455.00
Jumlah Biaya bahan . . Rp. 54,821.67
. . Rp. 110,256.67
Overhead + Profit (10%) Rp. 11,025.67
Jumlah Total Rp. 121,282.33

1 m3 Beton dengan mutu K-100 (manual)


1.200 h.o Pekerja Rp 118,000.00 Rp 141,600.00
0.200 h.o Tukang batu Rp 138,000.00 Rp 27,600.00
0.020 h.o Kepala tukang Rp 143,000.00 Rp 2,860.00
0.060 h.o Mandor Rp 163,000.00 Rp 9,780.00
Jumlah Upah Kerja . . Rp. 181,840.00
0.708 m3 Batu pecah Rp 260,000.00 Rp 184,151.72
0.496 m3 Pasir beton Rp 165,000.00 Rp 81,858.33
4.600 zak Semen portland 50 kg Rp 58,000.00 Rp 266,800.00
Jumlah Biaya bahan . . Rp. 532,810.06
. . Rp. 714,650.06
Overhead + Profit (10%) Rp. 71,465.01
Jumlah Total Rp. 786,115.06

1 m3 Beton dengan mutu K-175 (Ready Mix)


1.000 h.o Pekerja Rp 118,000.00 Rp 118,000.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.100 h.o Mandor Rp 163,000.00 Rp 16,300.00
Jumlah Upah Kerja . Rp 172,375.00
1.050 m3 Beton Ready Mix K-175 Rp 815,000.00 Rp 855,750.00
Jumlah Biaya bahan . Rp 855,750.00
. Rp 1,028,125.00
Overhead + Profit (10%) Rp. 102,812.50
Jumlah Total Rp. 1,130,937.50

1 m3 Beton dengan mutu K-250 (Ready Mix)


1.000 h.o Pekerja Rp 118,000.00 Rp 118,000.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.100 h.o Mandor Rp 163,000.00 Rp 16,300.00
Jumlah Upah Kerja . Rp 172,375.00
1.050 m3 Beton Ready Mix K-250 Rp 964,000.00 Rp 1,012,200.00
Jumlah Biaya bahan . Rp 1,012,200.00
. Rp 1,184,575.00
Overhead + Profit (10%) Rp. 118,457.50
Jumlah Total Rp. 1,303,032.50

1 m3 Beton dengan mutu K-300 (Ready Mix)


1.000 h.o Pekerja Rp 118,000.00 Rp 118,000.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.100 h.o Mandor Rp 163,000.00 Rp 16,300.00
Jumlah Upah Kerja . Rp 172,375.00
1.050 m3 Beton Ready Mix K-300 Rp 1,000,000.00 Rp 1,050,000.00
Jumlah Biaya bahan . Rp 1,050,000.00
. Rp 1,222,375.00
Overhead + Profit (10%) Rp. 122,237.50
Jumlah Total Rp. 1,344,612.50

1 m3 Beton dengan mutu K-350 (Ready Mix)


1.000 h.o Pekerja Rp 118,000.00 Rp 118,000.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.100 h.o Mandor Rp 163,000.00 Rp 16,300.00
Jumlah Upah Kerja . Rp 172,375.00
1.050 m3 Beton Ready Mix K-350 Rp 1,070,000.00 Rp 1,123,500.00
Jumlah Biaya bahan . Rp 1,123,500.00
. Rp 1,295,875.00
Overhead + Profit (10%) Rp. 129,587.50
Jumlah Total Rp. 1,425,462.50

1 m³ Beton K-175
1.650 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.275 ho tukang batu Rp 138,000.00 Rp 37,950.00
0.028 ho kepala tukang Rp 143,000.00 Rp 4,004.00
0.083 h.o Mandor Rp 163,000.00 Rp 13,529.00
Jumlah Upah Kerja Rp 250,183.00
0.572 m³ Batu pecah Rp 250,000.00 Rp 142,925.00
0.543 m³ Pasir beton (lokal) Rp 165,000.00 Rp 89,578.50
6.520 zak Semen portland 50 kg Rp 58,000.00 Rp 378,160.00
Jumlah Biaya bahan Rp 610,663.50
. Rp 860,846.50
Overhead + Profit (10%) Rp. 86,084.65
Jumlah Total Rp. 946,931.15

1 m³ Beton K-250
1.650 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.275 ho tukang batu Rp 138,000.00 Rp 37,950.00
0.028 ho kepala tukang Rp 143,000.00 Rp 4,004.00
0.083 h.o Mandor Rp 163,000.00 Rp 13,529.00
Jumlah Upah Kerja Rp 250,183.00
0.577 m³ Batu pecah Rp 250,000.00 Rp 144,325.00
0.494 m³ Pasir beton (lokal) Rp 165,000.00 Rp 81,559.50
8.533 zak Semen portland 50 kg Rp 58,000.00 Rp 494,933.33
Jumlah Biaya bahan Rp Rp 720,817.83
. Rp 971,000.83
Overhead + Profit (10%) Rp. 97,100.08
Jumlah Total Rp. 1,068,100.92

1 m³ Beton K-300
1.650 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.275 ho tukang batu Rp 138,000.00 Rp 37,950.00
0.028 ho kepala tukang Rp 143,000.00 Rp 4,004.00
0.083 h.o Mandor Rp 163,000.00 Rp 13,529.00
Jumlah Upah Kerja Rp 250,183.00
0.624 m³ Batu pecah Rp 250,000.00 Rp 155,980.00
0.535 m³ Pasir beton (lokal) Rp 165,000.00 Rp 88,281.60
9.178 zak Semen portland 50 kg Rp 58,000.00 Rp 532,311.11
Jumlah Biaya bahan Rp Rp 776,572.71
Jumlah Total Rp 1,026,755.71
Rp. 102,675.57
Overhead + Profit (10%) Rp. 1,129,431.28
Jumlah Total

1 m' Kolom praktis 15x15 cm, K-175


0.180 h.o Pekerja Rp 118,000.00 Rp 21,240.00
0.020 h.o Tukang batu Rp 138,000.00 Rp 2,760.00
0.020 h.o Tukang kayu Rp 138,000.00 Rp 2,760.00
0.020 h.o Tukang besi Rp 138,000.00 Rp 2,760.00
0.006 h.o Kepala tukang Rp 143,000.00 Rp 858.00
0.009 h.o Mandor Rp 163,000.00 Rp 1,467.00
Jumlah Upah Kerja . . Rp. 31,845.00
0.002 m3 Kayu sembarang Rp 2,182,000.00 Rp 4,364.00
0.010 kg Paku biasa 2" - 5 " Rp 20,000.00 Rp 200.00
3.000 kg Besi beton polos Rp 12,000.00 Rp 36,000.00
0.450 kg Kawat beton Rp 24,800.00 Rp 11,160.00
6.000 kg Semen portland Rp 1,160.00 Rp 6,960.00
0.006 m3 Pasir beton Rp 165,000.00 Rp 990.00
0.009 m3 Koral beton Rp 250,000.00 Rp 2,250.00
Jumlah Biaya Peralatan . . Rp. 61,924.00
. . Rp. 93,769.00
Overhead + Profit (10%) Rp. 9,376.90
Jumlah Total Rp. 103,145.90

1 kg Pembesian dengan besi polos atau besi ulir


0.007 h.o Pekerja Rp 118,000.00 Rp 826.00
0.007 h.o Tukang batu Rp 138,000.00 Rp 966.00
0.001 h.o Kepala tukang Rp 143,000.00 Rp 100.10
0.000 h.o Mandor Rp 163,000.00 Rp 48.90
Jumlah Upah Kerja . . Rp. 1,941.00
1.050 kg Besi beton (polos/ulir) Rp 12,000.00 Rp 12,600.00
0.015 kg Kawat beton/bendrat Rp 24,800.00 Rp 372.00
Jumlah Biaya bahan . . Rp. 12,972.00
. . Rp. 14,913.00
Overhead + Profit (10%) Rp. 1,491.30
Jumlah Total Rp. 16,404.30

1 m3 beton bertulang 1 PC : 2 Pasir : 3 Batu Pecah


1.650 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.080 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . Rp. 245,815.00
0.780 m3 Batu pecah Rp 260,000.00 Rp 202,800.00
0.520 m3 pasir beton Rp 165,000.00 Rp 85,800.00
4.640 sak Semen Portland 50kg Rp 58,000.00 Rp 269,120.00
Jumlah Biaya bahan . . Rp. 557,720.00
. . Rp. 803,535.00
Overhead + Profit (10%) Rp. 80,353.50
Jumlah Total Rp. 883,888.50

1 m3 beton bertulang 1 PC : 2 Pasir : 4 Batu Pecah


1.650 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.080 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . Rp. 245,815.00
0.900 m3 Batu pecah Rp 260,000.00 Rp 234,000.00
0.450 m3 pasir beton Rp 165,000.00 Rp 74,250.00
5.600 sak Semen Portland 50kg Rp 58,000.00 Rp 324,800.00
Jumlah Biaya bahan . . Rp. 633,050.00
. . Rp. 878,865.00
Overhead + Profit (10%) Rp. 87,886.50
Jumlah Total Rp. 966,751.50

1 m3 beton bertulang 1 PC : 2 Pasir : 2,5 Batu Pecah


1.650 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.080 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . Rp. 245,815.00
0.700 m3 Batu pecah Rp 260,000.00 Rp 182,000.00
0.560 m3 pasir beton Rp 165,000.00 Rp 92,400.00
7.040 sak Semen Portland 50kg Rp 58,000.00 Rp 408,320.00
Jumlah Biaya bahan . . Rp. 682,720.00
. . Rp. 928,535.00
Overhead + Profit (10%) Rp. 92,853.50
Jumlah Total Rp. 1,021,388.50

1 m3 beton bertulang 1 PC : 1,5 Pasir : 3 Batu Pecah


1.650 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.080 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . Rp. 245,815.00
0.540 m3 Batu pecah Rp 260,000.00 Rp 140,400.00
0.420 m3 pasir beton Rp 165,000.00 Rp 69,300.00
7.140 sak Semen Portland 50kg Rp 58,000.00 Rp 414,120.00
Jumlah Biaya bahan . . Rp. 623,820.00
. . Rp. 869,635.00
Overhead + Profit (10%) Rp. 86,963.50
Jumlah Total Rp. 956,598.50

1 m3 beton bertulang 1 PC : 1 Pasir : 2 Batu Pecah


1.650 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.080 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . Rp. 245,815.00
0.740 m3 Batu pecah Rp 260,000.00 Rp 192,400.00
0.370 m3 pasir beton Rp 165,000.00 Rp 61,050.00
9.580 sak Semen Portland 50kg Rp 58,000.00 Rp 555,640.00
Jumlah Biaya bahan . . Rp. 809,090.00
. . Rp. 1,054,905.00
Overhead + Profit (10%) Rp. 105,490.50
Jumlah Total Rp. 1,160,395.50

1 m3 beton tumbuk 1 PC : 3 Pasir : 5 Batu Pecah


1.650 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.080 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . Rp. 245,815.00
0.870 m3 Batu pecah Rp 260,000.00 Rp 226,200.00
0.520 m3 pasir beton Rp 165,000.00 Rp 85,800.00
4.360 sak Semen Portland 50kg Rp 58,000.00 Rp 252,880.00
Jumlah Biaya bahan . . Rp. 564,880.00
. . Rp. 810,695.00
Overhead + Profit (10%) Rp. 81,069.50
Jumlah Total Rp. 891,764.50

1 m3 beton tumbuk 1 PC : 3 Pasir : 6 Batu Pecah


1.650 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.080 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . Rp. 245,815.00
0.940 m3 Batu pecah Rp 260,000.00 Rp 244,400.00
0.470 m3 pasir beton Rp 165,000.00 Rp 77,550.00
3.940 sak Semen Portland 50kg Rp 58,000.00 Rp 228,520.00
Jumlah Biaya bahan . . Rp. 550,470.00
. . Rp. 796,285.00
Overhead + Profit (10%) Rp. 79,628.50
Jumlah Total Rp. 875,913.50
1 m3 beton tumbuk 1 PC : 4 Pasir : 6 Batu Pecah
1.650 h.o Pekerja Rp 118,000.00 Rp 194,700.00
0.250 h.o Tukang batu Rp 138,000.00 Rp 34,500.00
0.025 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.080 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja . . Rp. 245,815.00
0.870 m3 Batu pecah Rp 260,000.00 Rp 226,200.00
0.570 m3 pasir beton Rp 165,000.00 Rp 94,050.00
3.460 sak Semen Portland 50kg Rp 58,000.00 Rp 200,680.00
Jumlah Biaya bahan . . Rp. 520,930.00
. . Rp. 766,745.00
Overhead + Profit (10%) Rp. 76,674.50
Jumlah Total Rp. 843,419.50

1 m3 Pasang pondasi batu kosong


0.780 h.o pekerja Rp 118,000.00 Rp. 92,040.00
0.390 h.o tukang batu Rp 138,000.00 Rp. 53,820.00
0.039 h.o kepala tukang Rp 143,000.00 Rp. 5,577.00
0.039 h.o mandor Rp 163,000.00 Rp. 6,357.00
Jumlah Upah Kerja . . Rp. 157,794.00
1.200 m3 Batu belah 15/20 Rp 146,900.00 Rp. 176,280.00
0.300 m3 Pasir pasang Rp 165,000.00 Rp. 49,500.00
Jumlah Biaya bahan . . Rp. 225,780.00
. . Rp. 383,574.00
Overhead + Profit (10%) Rp. 38,357.40
Jumlah Total Rp. 421,931.40

1 m3 Pasang pondasi batu kali, 1Pc : 3 Pasir


0.600 h.o tukang batu Rp 138,000.00 Rp. 82,800.00
0.060 h.o kepala tukang Rp 143,000.00 Rp. 8,580.00
1.500 h.o pekerja Rp 118,000.00 Rp. 177,000.00
0.075 h.o mandor Rp 163,000.00 Rp. 12,225.00
Jumlah Upah Kerja . . Rp. 280,605.00
1.100 m3 Batu belah 15/20 Rp 146,900.00 Rp. 161,590.00
4.040 sak Semen Portland 50kg Rp 58,000.00 Rp 234,320.00
0.485 m3 Pasir pasang Rp 165,000.00 Rp 80,025.00
Jumlah Biaya bahan . . Rp. 475,935.00
. . Rp. 756,540.00
Overhead + Profit (10%) Rp. 75,654.00
Jumlah Total Rp. 832,194.00

1 m3 Pasang pondasi batu kali, 1Pc : 4 Pasir


0.600 h.o tukang batu Rp 138,000.00 Rp. 82,800.00
0.060 h.o kepala tukang Rp 143,000.00 Rp. 8,580.00
1.500 h.o pekerja Rp 118,000.00 Rp. 177,000.00
0.075 h.o mandor Rp 163,000.00 Rp. 12,225.00
Jumlah Upah Kerja . . Rp. 280,605.00
1.100 m3 Batu belah 15/20 Rp 146,900.00 Rp. 161,590.00
3.260 sak Semen Portland 50kg Rp 58,000.00 Rp 189,080.00
0.520 m3 Pasir pasang Rp 165,000.00 Rp 85,800.00
Jumlah Biaya bahan . . Rp. 436,470.00
. . Rp. 717,075.00
Overhead + Profit (10%) Rp. 71,707.50
Jumlah Total Rp. 788,782.50

1 m3 Pasang pondasi sumuran diameter 100 cm


0.300 h.o tukang batu Rp 138,000.00 Rp. 41,400.00
0.030 h.o kepala tukang Rp 143,000.00 Rp. 4,290.00
2.380 h.o pekerja Rp 118,000.00 Rp. 280,840.00
0.080 h.o mandor Rp 163,000.00 Rp. 13,040.00
Jumlah Upah Kerja . . Rp. 339,570.00
0.450 m3 Batu belah 15/20 Rp 146,900.00 Rp. 66,105.00
5.600 sak Semen Portland 50kg Rp 58,000.00 Rp 324,800.00
0.670 m3 Batu pecah Rp 211,000.00 Rp 141,370.00
0.450 m3 Pasir pasang Rp 165,000.00 Rp 74,250.00
Jumlah Biaya bahan . . Rp. 606,525.00
. . Rp. 946,095.00
Overhead + Profit (10%) Rp. 94,609.50
Jumlah Total Rp. 1,040,704.50

1 m2 Pasangan bata merah tebal 1 bata, 1PC : 1 Pasir


0.200 h.o Tukang batu Rp 138,000.00 Rp. 27,600.00
0.020 h.o Kepala tukang Rp 143,000.00 Rp. 2,860.00
0.650 h.o Pekerja Rp 118,000.00 Rp. 76,700.00
0.030 h.o Mandor Rp 163,000.00 Rp. 4,890.00
Jumlah Upah Kerja . . Rp. 112,050.00
140.000 bh Bata merah ( 5 x 11 x 22 cm) Rp 600.00 Rp 84,000.00
1.281 sak Semen Portland 50kg Rp 58,000.00 Rp 74,274.80
0.059 m3 Pasir pasang Rp 165,000.00 Rp 9,735.00
Jumlah Biaya bahan . . Rp. 168,009.80
. . Rp. 280,059.80
Overhead + Profit (10%) Rp. 28,005.98
Jumlah Total Rp. 308,065.78

1 m2 Pasangan bata merah tebal 1 bata, 1PC : 2 Pasir


0.200 h.o Tukang batu Rp 138,000.00 Rp. 27,600.00
0.020 h.o Kepala tukang Rp 143,000.00 Rp. 2,860.00
0.650 h.o Pekerja Rp 118,000.00 Rp. 76,700.00
0.030 h.o Mandor Rp 163,000.00 Rp. 4,890.00
Jumlah Upah Kerja . . Rp. 112,050.00
140.000 bh Bata merah ( 5 x 11 x 22 cm) Rp 600.00 Rp 84,000.00
0.870 sak Semen Portland 50kg Rp 58,000.00 Rp 50,460.00
0.080 m3 Pasir pasang Rp 165,000.00 Rp 13,200.00
Jumlah Biaya bahan . . Rp. 147,660.00
. . Rp. 259,710.00
Overhead + Profit (10%) Rp. 25,971.00
Jumlah Total Rp. 285,681.00

1 m2 Pasangan bata merah tebal 1 bata, 1PC : 3 Pasir


0.200 h.o Tukang batu Rp 138,000.00 Rp. 27,600.00
0.020 h.o Kepala tukang Rp 143,000.00 Rp. 2,860.00
0.650 h.o Pekerja Rp 118,000.00 Rp. 76,700.00
0.030 h.o Mandor Rp 163,000.00 Rp. 4,890.00
Jumlah Upah Kerja . . Rp. 112,050.00
140.000 bh Bata merah ( 5 x 11 x 22 cm) Rp 600.00 Rp 84,000.00
0.659 sak Semen Portland 50kg Rp 58,000.00 Rp 38,222.00
0.091 m3 Pasir pasang Rp 165,000.00 Rp 15,015.00
Jumlah Biaya bahan . . Rp. 137,237.00
. . Rp. 249,287.00
Overhead + Profit (10%) Rp. 24,928.70
Jumlah Total Rp. 274,215.70

1 m2 Pasangan bata merah tebal 1 bata, 1PC : 4 Pasir


0.200 h.o Tukang batu Rp 138,000.00 Rp. 27,600.00
0.020 h.o Kepala tukang Rp 143,000.00 Rp. 2,860.00
0.650 h.o Pekerja Rp 118,000.00 Rp. 76,700.00
0.030 h.o Mandor Rp 163,000.00 Rp. 4,890.00
Jumlah Upah Kerja . . Rp. 112,050.00
140.000 bh Bata merah ( 5 x 11 x 22 cm) Rp 600.00 Rp 84,000.00
0.531 sak Semen Portland 50kg Rp 58,000.00 Rp 30,798.00
0.093 m3 Pasir pasang Rp 165,000.00 Rp 15,345.00
Jumlah Biaya bahan . . Rp. 130,143.00
. . Rp. 242,193.00
Overhead + Profit (10%) Rp. 24,219.30
Jumlah Total Rp. 266,412.30

1 m2 Pasangan bata merah tebal 1 bata, 1PC : 5 Pasir


0.200 h.o Tukang batu Rp 138,000.00 Rp. 27,600.00
0.020 h.o Kepala tukang Rp 143,000.00 Rp. 2,860.00
0.650 h.o Pekerja Rp 118,000.00 Rp. 76,700.00
0.030 h.o Mandor Rp 163,000.00 Rp. 4,890.00
Jumlah Upah Kerja . . Rp. 112,050.00
140.000 bh Bata merah ( 5 x 11 x 22 cm) Rp 600.00 Rp 84,000.00
0.444 sak Semen Portland 50kg Rp 58,000.00 Rp 25,752.00
0.102 m3 Pasir pasang Rp 165,000.00 Rp 16,830.00
Jumlah Biaya bahan . . Rp. 126,582.00
. . Rp. 238,632.00
Overhead + Profit (10%) Rp. 23,863.20
Jumlah Total Rp. 262,495.20

1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 1 Pasir


0.100 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.010 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.320 h.o Pekerja Rp 118,000.00 Rp. 37,760.00
0.015 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . Rp. 55,435.00

70.000 bh Bata merah ( 5 x 11 x 22 cm) Rp 600.00 Rp 42,000.00


0.556 sak Semen Portland 50kg Rp 58,000.00 Rp 32,248.00
0.028 m3 Pasir pasang Rp 165,000.00 Rp 4,620.00
Jumlah Biaya bahan . . Rp. 78,868.00
. . Rp. 134,303.00
Overhead + Profit (10%) Rp. 13,430.30
Jumlah Total Rp. 147,733.30

1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 2 Pasir


0.100 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.010 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.320 h.o Pekerja Rp 118,000.00 Rp. 37,760.00
0.015 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . Rp. 55,435.00
70.000 bh Bata merah ( 5 x 11 x 22 cm) Rp 600.00 Rp 42,000.00
0.379 sak Semen Portland 50kg Rp 58,000.00 Rp 21,982.00
0.038 m3 Pasir pasang Rp 165,000.00 Rp 6,270.00
Jumlah Biaya bahan . . Rp. 70,252.00
. . Rp. 125,687.00
Overhead + Profit (10%) Rp. 12,568.70
Jumlah Total Rp. 138,255.70

1 m2 Pasangan bata merah tebal 1/2 bata, 1PC : 3 Pasir


0.100 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.010 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.300 h.o Pekerja Rp 118,000.00 Rp. 35,400.00
0.015 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . Rp. 53,075.00
70.000 bh Bata merah ( 5 x 11 x 22 cm) Rp 750.00 Rp 52,500.00
0.287 sak Semen Portland 50kg Rp 58,000.00 Rp 16,669.20
0.040 m3 Pasir pasang Rp 165,000.00 Rp 6,600.00
Jumlah Biaya bahan . . Rp. 75,769.20
. . Rp. 128,844.20
Overhead + Profit (10%) Rp. 12,884.42
Jumlah Total Rp. 141,728.62

1 m2 Pasangan dinding roster/terawang (12 x 11 x 24) cm


0.100 h.o Tukang batu Rp 138,000.00 Rp. 13,800.00
0.010 h.o Kepala tukang Rp 143,000.00 Rp. 1,430.00
0.300 h.o Pekerja Rp 118,000.00 Rp. 35,400.00
0.015 h.o Mandor Rp 163,000.00 Rp. 2,445.00
Jumlah Upah Kerja . . Rp. 53,075.00
36.000 bh Roster/terawang Rp 20,000.00 Rp 720,000.00
0.256 sak Semen Portland 50kg Rp 58,000.00 Rp 14,848.00
0.035 m3 Pasir pasang Rp 165,000.00 Rp 5,775.00
Jumlah Biaya bahan . . Rp. 740,623.00
. . Rp. 793,698.00
Overhead + Profit (10%) Rp. 79,369.80
Jumlah Total Rp. 873,067.80

1 m2 Plesteran trasram 1 PC : 1 pasir, tebal 1,5 cm


0.150 h.o tukang batu Rp 138,000.00 Rp 20,700.00
0.015 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.200 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.010 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . Rp. 48,075.00
0.258 sak Semen Portland 50kg Rp 58,000.00 Rp 14,987.20
0.013 m3 Pasir pasang Rp 165,000.00 Rp 2,145.00
Jumlah Biaya bahan . . Rp. 17,132.20
. . Rp. 65,207.20
Overhead + Profit (10%) Rp. 6,520.72
Jumlah Total Rp. 71,727.92

1 m2 Plesteran trasram 1 PC : 2 pasir, tebal 1,5 cm


0.150 h.o tukang batu Rp 138,000.00 Rp 20,700.00
0.015 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.200 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.010 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . Rp. 48,075.00
0.170 sak Semen Portland 50kg Rp 58,000.00 Rp 9,883.20
0.017 m3 Pasir pasang Rp 165,000.00 Rp 2,805.00
Jumlah Biaya bahan . . Rp. 12,688.20
. . Rp. 60,763.20
Overhead + Profit (10%) Rp. 6,076.32
Jumlah Total Rp. 66,839.52

1 m2 Plesteran 1 PC : 3 pasir, tebal 1,5 cm


0.150 h.o tukang batu Rp 138,000.00 Rp 20,700.00
0.015 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.300 h.o pekerja Rp 118,000.00 Rp 35,400.00
0.015 h.o mandor Rp 163,000.00 Rp 2,445.00
Jumlah Upah Kerja . . Rp. 60,690.00
0.130 sak Semen Portland 50kg Rp 58,000.00 Rp 7,516.80
0.023 m3 Pasir pasang Rp 165,000.00 Rp 3,795.00
Jumlah Biaya bahan . . Rp. 11,311.80
. . Rp. 72,001.80
Overhead + Profit (10%) Rp. 7,200.18
Jumlah Total Rp. 79,201.98

1 m² Acian
0.200 h.o Pekerja Rp 118,000.00 Rp 23,600.00
0.100 h.o Tukang Rp 138,000.00 Rp 13,800.00
0.010 h.o Kepala Tukang Rp 143,000.00 Rp 1,430.00
0.010 h.o Mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . Rp. 40,460.00
3.250 kg Semen portland 50 kg Rp 1,160.00 Rp 3,770.00
Jumlah Biaya bahan . . Rp. 3,770.00
. . Rp. 44,230.00
Overhead + Profit (10%) Rp. 4,423.00
Jumlah Total Rp. 48,653.00

1 m2 Pasang lantai keramik polish ukuran 60x60 cm


0.240 h.o pekerja Rp 118,000.00 Rp 28,320.00
0.120 h.o tukang batu Rp 138,000.00 Rp 16,560.00
0.012 h.o kepala tukang Rp 143,000.00 Rp 1,716.00
0.012 h.o mandor Rp 163,000.00 Rp 1,956.00
Jumlah Upah Kerja . . Rp. 48,552.00
3.100 bh Keramik 60x60 cm Rp 60,000.00 Rp 186,000.00
9.600 kg Semen Portland 50kg Rp 1,160.00 Rp 11,136.00
0.045 m3 Pasir pasang Rp 165,000.00 Rp 7,425.00
Jumlah Biaya bahan . . Rp. 204,561.00
. . Rp. 253,113.00
Overhead + Profit (10%) Rp. 25,311.30
Jumlah Total Rp. 278,424.30

1 m2 Pasang lantai keramik unpolish ukuran 60x60 cm


0.240 h.o pekerja Rp 118,000.00 Rp 28,320.00
0.120 h.o tukang batu Rp 138,000.00 Rp 16,560.00
0.012 h.o kepala tukang Rp 143,000.00 Rp 1,716.00
0.012 h.o mandor Rp 163,000.00 Rp 1,956.00
Jumlah Upah Kerja . . Rp. 48,552.00
3.100 bh Keramik 60x60 cm Rp 60,000.00 Rp 186,000.00
9.600 kg Semen Portland 50kg Rp 1,160.00 Rp 11,136.00
0.045 m3 Pasir pasang Rp 165,000.00 Rp 7,425.00
Jumlah Biaya bahan . . Rp. 204,561.00
. . Rp. 253,113.00
Overhead + Profit (10%) Rp. 25,311.30
Jumlah Total Rp. 278,424.30

1 m2 Pasang dinding keramik ukuran 25x40cm


0.240 h.o pekerja Rp 118,000.00 Rp 28,320.00
0.120 h.o tukang batu Rp 138,000.00 Rp 16,560.00
0.012 h.o kepala tukang Rp 143,000.00 Rp 1,716.00
0.012 h.o mandor Rp 163,000.00 Rp 1,956.00
Jumlah Upah Kerja . . Rp. 48,552.00
6.630 bh Keramik 25x40 cm Rp 7,700.00 Rp 51,051.00
0.196 zak Semen Portland 50kg Rp 58,000.00 Rp 11,368.00
0.045 m3 Pasir pasang Rp 165,000.00 Rp 7,425.00
Jumlah Biaya bahan . . Rp. 69,844.00
. . Rp. 118,396.00
Overhead + Profit (10%) Rp. 11,839.60
Jumlah Total Rp. 130,235.60

1 m2 Pasang lantai keramik ukuran 40x40cm


0.240 h.o pekerja Rp 118,000.00 Rp 28,320.00
0.120 h.o tukang batu Rp 138,000.00 Rp 16,560.00
0.012 h.o kepala tukang Rp 143,000.00 Rp 1,716.00
0.012 h.o mandor Rp 163,000.00 Rp 1,956.00
Jumlah Upah Kerja . . Rp. 48,552.00
6.630 bh Keramik 40x40 cm Rp 11,250.00 Rp 74,587.50
0.196 zak Semen Portland 50kg Rp 58,000.00 Rp 11,368.00
0.045 m3 Pasir pasang Rp 165,000.00 Rp 7,425.00
Jumlah Biaya bahan . . Rp. 93,380.50
. . Rp. 141,932.50
Overhead + Profit (10%) Rp. 14,193.25
Jumlah Total Rp. 156,125.75

1 m2 Pemasangan Waterproofing
0.300 h.o Pekerja Rp 118,000.00 Rp 35,400.00
0.200 h.o Tukang Rp 138,000.00 Rp 27,600.00
0.020 h.o Kepala Tukang Rp 143,000.00 Rp 2,860.00
0.015 h.o Mandor Rp 163,000.00 Rp 2,445.00
Jumlah Upah Kerja . . Rp. 68,305.00
1.050 roll Waterproof Membrant Rp 257,500.00 Rp. 270,375.00
0.500 kg Semen Pc Rp 1,160.00 Rp. 580.00
0.006 m3 Pasir Pasangan Rp 165,000.00 Rp. 990.00
Jumlah Biaya bahan . . Rp. 271,945.00
. . Rp. 340,250.00
Overhead + Profit (10%) Rp. 34,025.00
Jumlah Total Rp. 374,275.00

1 m2 Pasang Floor Hardener


0.120 h.o pekerja Rp 118,000.00 Rp 14,160.00
0.120 h.o tukang batu Rp 138,000.00 Rp 16,560.00
0.120 h.o kepala tukang Rp 143,000.00 Rp 17,160.00
0.006 h.o mandor Rp 163,000.00 Rp 978.00
Jumlah Upah Kerja . . Rp. 48,858.00
5.000 kg Floor hardener Rp 10,847.00 Rp 54,235.00
Jumlah Biaya bahan . . Rp. 54,235.00
. . Rp. 103,093.00
Overhead + Profit (10%) Rp. 10,309.30
Jumlah Total Rp. 113,402.30

1 m2 Pasang atap spandek 3.5 mm


0.150 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.075 h.o tukang kayu Rp 138,000.00 Rp. 10,350.00
0.008 h.o kepala tukang Rp 143,000.00 Rp. 1,144.00
0.006 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja . . Rp 30,172.00
1.050 m2 atap spandek Rp. 55,000.00 Rp. 57,750.00
0.020 kg Paku hak panjang 15 cm Rp. 30,000.00 Rp. 600.00
Jumlah Biaya Bahan . . Rp 58,350.00
. . Rp. 88,522.00
Overhead + Profit (10%) Rp. 8,852.20
Jumlah Total Rp. 97,374.20

1 m' Pasang nok/bubungan atap seng


0.1500 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.0700 h.o tukang kayu Rp 138,000.00 Rp. 9,660.00
0.0080 h.o kepala tukang Rp 143,000.00 Rp. 1,144.00
0.0060 h.o mandor Rp 163,000.00 Rp. 978.00
Jumlah Upah Kerja Rp. 29,482.00
0.3000 lbr Bubungan Spandek Rp. 63,250.00 Rp. 18,975.00
0.0200 kg Paku hak panjang 15 cm Rp. 30,000.00 Rp. 600.00
Jumlah Biaya Bahan . . Rp 19,575.00
Rp. 49,057.00
Overhead + Profit (10%) Rp. 4,905.70
Jumlah Total Rp. 53,962.70

1 m2 Pasang alas atap aluminium foil/sisalation


0.150 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.050 h.o tukang kayu Rp 138,000.00 Rp 6,900.00
0.005 h.o kepala tukang Rp 143,000.00 Rp 715.00
0.008 h.o mandor Rp 163,000.00 Rp 1,304.00
Jumlah Upah Kerja . . Rp. 26,619.00
1.050 m2 Sisalation/aluminium foil Rp 9,300.00 Rp 9,765.00
Jumlah Biaya bahan . . Rp. 9,765.00
. . Rp. 36,384.00
Overhead + Profit (10%) Rp. 3,638.40
Jumlah Total Rp. 40,022.40
1 m2 Mengerok karat cat lama permukaan baja (manual)
0.150 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 18,107.50
0.050 bh Sikat besi Rp 15,000.00 Rp 750.00
Jumlah Biaya peralatan . . Rp. 750.00
. . Rp. 18,857.50
Overhead + Profit (10%) Rp. 1,885.75
Jumlah Total Rp. 20,743.25

1 m2 Mengikis/mengerok permukaan cat tembok lama


0.150 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 18,107.50
0.050 kg Soda api Rp 20,000.00 Rp 1,000.00
Jumlah Biaya bahan . . Rp. 1,000.00
. . Rp. 19,107.50
Overhead + Profit (10%) Rp. 1,910.75
Jumlah Total Rp. 21,018.25

1 m2 Membersihkan permukaan tembok yang pernah dicat


0.150 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 18,107.50
0.050 kg Sabun Rp 25,000.00 Rp 1,250.00
Jumlah Biaya bahan . . Rp. 1,250.00
. . Rp. 19,357.50
Overhead + Profit (10%) Rp. 1,935.75
Jumlah Total Rp. 21,293.25

1 m2 Melabur tembok dengan kapur sirih


0.150 h.o pekerja Rp 118,000.00 Rp 17,700.00
0.001 h.o tukang cat Rp 138,000.00 Rp 138.00
0.000 h.o kepala tukang Rp 143,000.00 Rp 14.30
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 18,259.80
0.100 lbr Kertas Ampelas Rp 7,000.00 Rp 700.00
0.250 ikat Alang-alang Rp 1,500.00 Rp 375.00
0.002 m3 Perancah kayu Rp 2,200,000.00 Rp 4,400.00
0.150 kg Kapur sirih Rp 170,700.00 Rp 25,605.00
Jumlah Biaya bahan . . Rp. 31,080.00
. . Rp. 49,339.80
Overhead + Profit (10%) Rp. 4,933.98
Jumlah Total Rp. 54,273.78

1 m2 Melabur tembok lama dengan kapur sirih (untuk pemeliharaan)


0.040 h.o pekerja Rp 118,000.00 Rp 4,720.00

0.005 h.o tukang cat Rp 138,000.00 Rp 690.00


0.001 h.o kepala tukang Rp 143,000.00 Rp 71.50
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 5,889.00
0.002 m3 Perancah kayu Rp 2,200,000.00 Rp 4,400.00
0.300 kg Kapur sirih Rp 170,700.00 Rp 51,210.00
Jumlah Biaya bahan . . Rp. 55,610.00
. . Rp. 61,499.00
Overhead + Profit (10%) Rp. 6,149.90
Jumlah Total Rp. 67,648.90

1 m2 Pengecatan tembok baru ( 1x lapis plamur, 1x lapis cat dasar, 2x cat penutup)
0.020 h.o pekerja Rp 118,000.00 Rp 2,360.00
0.063 h.o tukang cat Rp 138,000.00 Rp 8,694.00
0.006 h.o kepala tukang Rp 143,000.00 Rp 900.90
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 12,362.40
0.100 kg Plamur Rp 24,000.00 Rp 2,400.00
0.100 kg Cat dasar Rp 65,000.00 Rp 6,500.00
0.360 kg Cat Penutup Rp 65,000.00 Rp 23,400.00
Jumlah Biaya bahan . . Rp. 32,300.00
. . Rp. 44,662.40
Overhead + Profit (10%) Rp. 4,466.24
Jumlah Total Rp. 49,128.64

1 m2 Pengecatan tembok lama ( 3x lapis cat tembok )


0.028 h.o pekerja Rp 118,000.00 Rp 3,304.00
0.042 h.o tukang cat Rp 138,000.00 Rp 5,796.00
0.004 h.o kepala tukang Rp 143,000.00 Rp 600.60
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 10,108.10
0.300 kg Cat tembok 3x Rp 65,000.00 Rp 19,500.00
Jumlah Biaya bahan . . Rp. 19,500.00
Jumlah Total . . Rp. 29,608.10

1 m2 Pengecatan plafond baru ( 1x lapis plamur, 3x lapis cat tembok)


0.030 h.o pekerja Rp 118,000.00 Rp 3,540.00
0.095 h.o tukang cat Rp 138,000.00 Rp 13,041.00
0.009 h.o kepala tukang Rp 143,000.00 Rp 1,351.35
0.004 h.o mandor Rp 163,000.00 Rp 611.25
Jumlah Upah Kerja . . Rp. 18,543.60
0.120 kg Plamur Rp 24,000.00 Rp 2,880.00
0.432 kg Cat tembok 3x Rp 65,000.00 Rp 28,080.00
Jumlah Biaya bahan . . Rp. 30,960.00
. . Rp. 49,503.60
Overhead + Profit (10%) Rp. 4,950.36
Jumlah Total Rp. 54,453.96

1 m2 Pengecatan plafond lama ( 3x lapis cat tembok )


0.042 h.o pekerja Rp 118,000.00 Rp 4,956.00
0.063 h.o tukang cat Rp 138,000.00 Rp 8,694.00
0.006 h.o kepala tukang Rp 143,000.00 Rp 900.90
0.004 h.o mandor Rp 163,000.00 Rp 611.25
Jumlah Upah Kerja . . Rp. 15,162.15
0.360 kg Cat tembok 3x Rp 65,000.00 Rp 23,400.00
Jumlah Biaya bahan . . Rp. 23,400.00
. . Rp. 38,562.15
Overhead + Profit (10%) Rp. 3,856.22
Jumlah Total Rp. 42,418.37

1 m2 Pengecatan bidang kayu lama


0.070 h.o pekerja Rp 118,000.00 Rp 8,260.00
0.075 h.o tukang cat Rp 138,000.00 Rp 10,350.00
0.008 h.o kepala tukang Rp 143,000.00 Rp 1,072.50
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 20,090.00
0.150 kg Plamur Rp 30,300.00 Rp 4,545.00
0.170 kg Cat dasar Rp 56,000.00 Rp 9,520.00
0.170 kg Cat penutup Rp 56,000.00 Rp 9,520.00
Jumlah Biaya bahan . . Rp. 23,585.00
. . Rp. 43,675.00
Overhead + Profit (10%) Rp. 4,367.50
Jumlah Total Rp. 48,042.50

1 m2 Pengecatan bidang kayu baru ( 1x lapis plamur, 3x lapis cat kayu )


0.070 h.o pekerja Rp 118,000.00 Rp 8,260.00
0.009 h.o tukang cat Rp 138,000.00 Rp 1,242.00
0.006 h.o kepala tukang Rp 143,000.00 Rp 858.00
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 10,767.50
0.150 kg Plamur Rp 30,300.00 Rp 4,545.00
0.200 kg Cat meni Rp 56,000.00 Rp 11,200.00
0.430 kg Cat kayu 3x Rp 56,000.00 Rp 24,080.00
Jumlah Biaya bahan . . Rp. 39,825.00
. . Rp. 50,592.50
Overhead + Profit (10%) Rp. 5,059.25
Jumlah Total Rp. 55,651.75

1 m2 Pelaburan bidang kayu dengan teak oil


0.040 h.o pekerja Rp 118,000.00 Rp 4,720.00
0.063 h.o tukang cat Rp 138,000.00 Rp 8,694.00
0.063 h.o kepala tukang Rp 143,000.00 Rp 9,009.00
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 22,830.50
0.360 ltr Teak oil Rp 46,500.00 Rp 16,740.00
Jumlah Biaya bahan . . Rp. 16,740.00
. . Rp. 39,570.50
Overhead + Profit (10%) Rp. 3,957.05
Jumlah Total Rp. 43,527.55

1 m2 Pelaburan bidang kayu dengan politur


0.060 h.o tukang cat Rp 138,000.00 Rp 8,280.00
0.016 h.o kepala tukang Rp 143,000.00 Rp 2,288.00
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 10,975.50
0.150 ltr Politur Rp 46,500.00 Rp 6,975.00
0.372 ltr Politur jadi Rp 46,500.00 Rp 17,298.00
2.000 lbr Kertas Ampelas Rp 7,000.00 Rp 14,000.00
Jumlah Biaya bahan . . Rp. 38,273.00
. . Rp. 49,248.50
Overhead + Profit (10%) Rp. 4,924.85
Jumlah Total Rp. 54,173.35

1 m2 Pelaburan bidang kayu dengan cat residu dan ter


0.100 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.006 h.o mandor Rp 163,000.00 Rp 978.00
Jumlah Upah Kerja . . Rp. 12,778.00
0.350 ltr Residu atau ter Rp 50,100.00 Rp 17,535.00
Jumlah Biaya bahan . . Rp. 17,535.00
. . Rp. 30,313.00
Overhead + Profit (10%) Rp. 3,031.30
Jumlah Total Rp. 33,344.30

1 m2 Pelaburan bidang kayu dengan vernis


0.160 h.o pekerja Rp 118,000.00 Rp 18,880.00
0.160 h.o tukang cat Rp 138,000.00 Rp 22,080.00
0.016 h.o kepala tukang Rp 143,000.00 Rp 2,288.00
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 43,655.50
0.150 ltr Vernis Rp 43,000.00 Rp 6,450.00
0.050 kg Dempul Rp 30,300.00 Rp 1,515.00
0.100 lbr Kertas Ampelas Rp 7,000.00 Rp 700.00
0.010 bh Kuas Rp 19,500.00 Rp 195.00
Jumlah Biaya bahan . . Rp. 8,860.00
Jumlah Total . . Rp. 52,515.50
Overhead + Profit (10%) Rp. 5,251.55
Jumlah Total Rp. 57,767.05

1 m2 Pengecatan permukaan baja dengan meni besi


0.020 h.o pekerja Rp 118,000.00 Rp 2,360.00
0.200 h.o tukang cat Rp 138,000.00 Rp 27,600.00
0.020 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.010 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . Rp. 34,450.00
0.100 kg Meni besi Rp 35,000.00 Rp 3,500.00
0.010 bh Kuas Rp 19,500.00 Rp 195.00
Jumlah Biaya bahan . . Rp. 3,695.00
. . Rp. 38,145.00
Overhead + Profit (10%) Rp. 3,814.50
Jumlah Total Rp. 41,959.50

1 m2 Pengecatan permukaan baja dengan cat


0.020 h.o pekerja Rp 118,000.00 Rp 2,360.00
0.200 h.o tukang cat Rp 138,000.00 Rp 27,600.00
0.020 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.010 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . Rp. 34,450.00
0.100 kg cat besi Rp 85,000.00 Rp 8,500.00
0.010 bh Kuas Rp 19,500.00 Rp 195.00
Jumlah Biaya bahan . . Rp. 8,695.00
Jumlah Total . . Rp. 43,145.00
Overhead + Profit (10%) Rp. 4,314.50
Jumlah Total Rp. 47,459.50

1 m2 Membongkar dinding tebal 2 bata merah (dipakai lagi)


0.224 h.o pekerja Rp 118,000.00 Rp 26,432.00
0.022 h.o mandor Rp 163,000.00 Rp 3,651.20
Jumlah Upah Kerja . . Rp 30,083.20
Overhead + Profit (10%) Rp. 3,008.32
Jumlah Total Rp. 33,091.52

1 m2 Membongkar dinding tebal 2 bata merah (dipakai lagi)


0.224 h.o pekerja Rp 118,000.00 Rp 26,432.00
0.022 h.o mandor Rp 163,000.00 Rp 3,651.20
Jumlah Upah Kerja . . Rp 30,083.20
Overhead + Profit (10%) Rp. 3,008.32
Jumlah Total Rp. 33,091.52

1 m2 Membongkar dinding tebal < 2 bata merah (dipakai lagi)


0.112 h.o pekerja Rp 118,000.00 Rp 13,216.00
0.006 h.o mandor Rp 163,000.00 Rp 912.80
Jumlah Upah Kerja . . Rp 14,128.80
Overhead + Profit (10%) Rp. 1,412.88
Jumlah Total Rp. 15,541.68

1 m2 Mengupas plesteran
0.056 h.o pekerja Rp 118,000.00 Rp 6,608.00
0.003 h.o mandor Rp 163,000.00 Rp 456.40
Jumlah Upah Kerja . . Rp 7,064.40
Overhead + Profit (10%) Rp. 706.44
Jumlah Total Rp. 7,770.84

1 m2 Membongkar atap sirap, genteng, asbes gelombang (dipakai lagi).


0.048 h.o pekerja Rp 118,000.00 Rp 5,664.00
0.002 h.o mandor Rp 163,000.00 Rp 391.20
Jumlah Upah Kerja . . Rp 6,055.20
Overhead + Profit (10%) Rp. 605.52
Jumlah Total Rp. 6,660.72

1 m2 Membongkar dan menurunkan atap seng


0.040 h.o tukang kayu Rp 138,000.00 Rp 5,520.00
0.080 h.o pekerja Rp 118,000.00 Rp 9,440.00
Jumlah Upah Kerja . . Rp 14,960.00
Overhead + Profit (10%) Rp. 1,496.00
Jumlah Total Rp. 16,456.00

1 m2 Membongkar rangka atap kayu (kayu dipakai lagi)


0.020 h.o tukang kayu Rp 138,000.00 Rp. 2,760.00
0.002 h.o kepala tukang Rp 143,000.00 Rp. 286.00
0.080 h.o pekerja Rp 118,000.00 Rp. 9,440.00
0.004 h.o mandor Rp 163,000.00 Rp. 652.00
Jumlah Upah Kerja . . Rp. 13,138.00
Overhead + Profit (10%) Rp. 1,313.80
Jumlah Total Rp. 14,451.80

1 m2 Membongkar lantai papan kayu tebal 8 Cm


0.045 h.o tukang kayu Rp 138,000.00 Rp. 6,210.00
0.005 h.o kepala tukang Rp 143,000.00 Rp. 643.50
0.150 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.008 h.o mandor Rp 163,000.00 Rp. 1,222.50
Jumlah Upah Kerja . . Rp. 25,776.00
Overhead + Profit (10%) Rp. 2,577.60
Jumlah Total Rp. 28,353.60

1 m3 Membongkar balok gelagar (kayu dipakai lagi)


4.800 h.o tukang kayu Rp 138,000.00 Rp. 662,400.00
0.480 h.o kepala tukang Rp 143,000.00 Rp. 68,640.00
3.200 h.o pekerja Rp 118,000.00 Rp. 377,600.00
0.160 h.o mandor Rp 163,000.00 Rp. 26,080.00
Jumlah Upah Kerja . . Rp. 1,134,720.00
Overhead + Profit (10%) Rp. 113,472.00
Jumlah Total Rp. 1,248,192.00

1 m2 Membongkar paving block


0.100 h.o pekerja Rp 118,000.00 Rp. 11,800.00
0.010 h.o mandor Rp 163,000.00 Rp. 1,630.00
Jumlah Upah Kerja . . Rp. 13,430.00
Overhead + Profit (10%) Rp. 1,343.00
Jumlah Total Rp. 14,773.00

1 m2 Membongkar lantai
0.100 h.o pekerja Rp 118,000.00 Rp. 11,800.00
0.010 h.o mandor Rp 163,000.00 Rp. 1,630.00
Jumlah Upah Kerja . . Rp. 13,430.00
Overhead + Profit (10%) Rp. 1,343.00
Jumlah Total Rp. 14,773.00

1 bh Membongkar dan melepas fender


4.000 h.o pekerja Rp 118,000.00 Rp. 472,000.00
1.000 h.o tukang Rp 138,000.00 Rp. 138,000.00
0.400 h.o mandor Rp 163,000.00 Rp. 65,200.00
1.000 ls alat bantu Rp 105,000.00 Rp. 105,000.00
Jumlah Upah Kerja . . Rp. 780,200.00
Overhead + Profit (10%) Rp. 78,020.00
Jumlah Total Rp. 858,220.00

1 kg Membongkar rangka baja gudang


0.008 h.o pekerja Rp 118,000.00 Rp. 944.00
0.010 h.o tukang besi Rp 138,000.00 Rp. 1,380.00
0.001 h.o kepala tukang Rp 143,000.00 Rp. 143.00
0.000 h.o mandor Rp 163,000.00 Rp. 65.20
Jumlah Upah Kerja . . Rp. 2,532.20
Overhead + Profit (10%) Rp. 253.22
Jumlah Total Rp. 2,785.42

1 m2 Membongkar Dinding Sekat (Aluminium+Rangka Kayu+Tripleks+Kaca)


0.250 h.o Pekerja Rp. 118,000.00 Rp. 29,500.00
0.025 h.o Mandor Rp. 163,000.00 Rp. 4,075.00
Jumlah Upah Kerja . . Rp. 33,575.00
Overhead + Profit (10%) Rp. 3,357.50
Jumlah Total Rp. 36,932.50

1m2 Membongkar perkerasan lama (serifying) tebal 10 cm


0.100 h.o pekerja Rp 118,000.00 Rp. 11,800.00
0.006 h.o mandor Rp 163,000.00 Rp. 978.00
1.000 ls alat bantu Rp 75,000.00 Rp. 75,000.00
Jumlah Upah Kerja . . Rp. 87,778.00
Overhead + Profit (10%) Rp. 8,777.80
Jumlah Total Rp. 96,555.80

1 m3 Membongkar Kusen Pintu Kayu


1.000 h.o Pekerja Rp. 118,000.00 Rp. 118,000.00
0.100 h.o Mandor Rp. 163,000.00 Rp. 16,300.00
Jumlah Upah Kerja . . Rp. 134,300.00
Overhead + Profit (10%) Rp. 13,430.00
Jumlah Total Rp. 147,730.00

1 m2 Membongkar Daun Pintu Kayu


0.020 h.o Pekerja Rp. 118,000.00 Rp. 2,360.00
0.001 h.o Mandor Rp. 163,000.00 Rp. 163.00
Jumlah Upah Kerja . . Rp. 2,523.00
Overhead + Profit (10%) Rp. 252.30
Jumlah Total Rp. 2,775.30

1 buah Pasang kunci tanam antik


0.060 h.o pekerja Rp 118,000.00 Rp 7,080.00
0.600 h.o tukang kayu Rp 138,000.00 Rp 82,800.00
0.060 h.o kepala tukang Rp 143,000.00 Rp 8,580.00
0.003 h.o mandor Rp 163,000.00 Rp 489.00
Jumlah Upah Kerja . . Rp. 98,949.00
1.000 set Kunci tanam antik Rp 130,000.00 Rp 130,000.00
Jumlah Biaya bahan . . Rp. 130,000.00
. . Rp. 228,949.00
Overhead + Profit (10%) Rp. 22,894.90
Jumlah Total Rp. 251,843.90

1 buah Pasang kunci tanam biasa


0.010 h.o pekerja Rp 118,000.00 Rp 1,180.00
0.500 h.o tukang kayu Rp 138,000.00 Rp 69,000.00
0.010 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.005 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . Rp. 72,425.00
1.000 set Kunci tanam biasa Rp 80,000.00 Rp 80,000.00
Jumlah Biaya bahan . . Rp. 80,000.00
. . Rp. 152,425.00
Overhead + Profit (10%) Rp. 15,242.50
Jumlah Total Rp. 167,667.50
1 buah Pasang kunci tanam kamar mandi / kunci silinder
0.005 h.o pekerja Rp 118,000.00 Rp 590.00
0.500 h.o tukang kayu Rp 138,000.00 Rp 69,000.00
0.005 h.o kepala tukang Rp 143,000.00 Rp 715.00
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 70,712.50
1.000 set Kunci tanam kamar mandi / kunci silinder Rp 80,000.00 Rp 80,000.00
Jumlah Biaya bahan . . Rp. 80,000.00
. . Rp. 150,712.50
Overhead + Profit (10%) Rp. 15,071.25
Jumlah Total Rp. 165,783.75

1 buah Pasang engsel pintu / spring knip


0.015 h.o pekerja Rp 118,000.00 Rp 1,770.00
0.150 h.o tukang kayu Rp 138,000.00 Rp 20,700.00
0.015 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.001 h.o mandor Rp 163,000.00 Rp 122.25
Jumlah Upah Kerja . . Rp. 24,737.25
1.000 set Engsel pintu / spring knip Rp 33,000.00 Rp 33,000.00
Jumlah Biaya bahan . . Rp. 33,000.00
. . Rp. 57,737.25
Overhead + Profit (10%) Rp. 5,773.73
Jumlah Total Rp. 63,510.98

1 buah Pasang engsel jendela kupu-kupu / door stop


0.010 h.o pekerja Rp 118,000.00 Rp 1,180.00
0.100 h.o tukang kayu Rp 138,000.00 Rp 13,800.00
0.010 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.001 h.o mandor Rp 163,000.00 Rp 81.50
Jumlah Upah Kerja . . Rp. 16,491.50
1.000 set Engsel jendela / door stop Rp 29,700.00 Rp 29,700.00
Jumlah Biaya bahan . . Rp. 29,700.00
. . Rp. 46,191.50
Overhead + Profit (10%) Rp. 4,619.15
Jumlah Total Rp. 50,810.65

1 buah Pasang engsel angin / kunci selot


0.020 h.o pekerja Rp 118,000.00 Rp 2,360.00
0.200 h.o tukang kayu Rp 138,000.00 Rp 27,600.00
0.020 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.010 h.o mandor Rp 163,000.00 Rp 1,630.00
Jumlah Upah Kerja . . Rp. 34,450.00
1.000 set Engsel angin / kunci selot Rp 29,700.00 Rp 29,700.00
Jumlah Biaya bahan . . Rp. 29,700.00
. . Rp. 64,150.00
Overhead + Profit (10%) Rp. 6,415.00
Jumlah Total Rp. 70,565.00

1 buah Pasang door closer / door holder


0.050 h.o pekerja Rp 118,000.00 Rp 5,900.00
0.500 h.o tukang kayu Rp 138,000.00 Rp 69,000.00
0.050 h.o kepala tukang Rp 143,000.00 Rp 7,150.00
0.003 h.o mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja . . Rp. 82,457.50
1.000 set Door closer / door holder Rp 250,000.00 Rp 250,000.00
Jumlah Biaya bahan . . Rp. 250,000.00
. . Rp. 332,457.50
Overhead + Profit (10%) Rp. 33,245.75
Jumlah Total Rp. 365,703.25

1 buah Pasang kunci lemari


0.025 h.o pekerja Rp 118,000.00 Rp 2,950.00
0.250 h.o tukang kayu Rp 138,000.00 Rp 34,500.00
0.025 h.o kepala tukang Rp 143,000.00 Rp 3,575.00
0.001 h.o mandor Rp 163,000.00 Rp 203.75
Jumlah Upah Kerja . . Rp. 41,228.75
1.000 set kunci lemari Rp 182,000.00 Rp 182,000.00
Jumlah Biaya bahan . . Rp. 182,000.00
. . Rp. 223,228.75
Overhead + Profit (10%) Rp. 22,322.88
Jumlah Total Rp. 245,551.63

1 m2 Pasang kaca tebal 3 - 5 mm


0.015 h.o pekerja Rp 118,000.00 Rp 1,770.00
0.150 h.o tukang kaca Rp 138,000.00 Rp 20,700.00
0.015 h.o kepala tukang Rp 143,000.00 Rp 2,145.00
0.001 h.o mandor Rp 163,000.00 Rp 122.25
Jumlah Upah Kerja . . Rp. 24,737.25
1.100 m2 Kaca tebal 3 / 5 mm Rp 150,000.00 Rp 165,000.00
0.050 kg Sealent Rp 315,000.00 Rp 15,750.00
Jumlah Biaya bahan . . Rp. 180,750.00
. . Rp. 205,487.25
Overhead + Profit (10%) Rp. 20,548.73
Jumlah Total Rp. 226,035.98

1 bh Pasang handle
0.050 h.o Pekerja Rp 118,000.00 Rp 5,900.00
0.500 h.o Tukang kayu Rp 138,000.00 Rp 69,000.00
0.050 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.003 h.o Mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja ..... . Rp. 82,457.50
1.000 bh Pull handle 450 mm Rp 403,700.00 Rp 403,700.00
1.000 bh Pull handle 300 mm Rp 286,000.00 Rp 286,000.00
1.000 set Lever handle Rp 319,000.00 Rp 319,000.00
1.000 bh Handle tanam Rp 104,500.00 Rp 104,500.00
Jumlah Biaya Pull handle 450 mm ..... . Rp. 403,700.00
Jumlah Biaya Pull handle 300 mm ..... . Rp. 286,000.00
Jumlah Biaya Bahan Lever handle ..... . Rp. 319,000.00
Jumlah Biaya Bahan Handle tanam ..... . Rp. 104,500.00
Rp. 1,113,200.00
Jumlah Biaya Pull handle 450 mm ..... . Rp. 486,157.50
Jumlah Biaya Pull handle 300 mm ..... . Rp. 572,000.00
Jumlah Biaya Bahan Lever handle ..... . Rp. 638,000.00
Jumlah Biaya Bahan Handle tanam ..... . Rp. 209,000.00
1,905,157.50
Jumlah Biaya Pull handle 450 mm verhead + Profit (10%) Rp. 534,773.25
Jumlah Biaya Pull handle 300 mm verhead + Profit (10%) Rp. 629,200.00
Jumlah Biaya Bahan Lever handle verhead + Profit (10%) Rp. 701,800.00
Jumlah Biaya Bahan Handle tanam verhead + Profit (10%) Rp. 229,900.00

1 bh Pasang kunci silinder


0.005 h.o Pekerja Rp 118,000.00 Rp 590.00
0.500 h.o Tukang kayu Rp 138,000.00 Rp 69,000.00
0.005 h.o Kepala tukang Rp 143,000.00 Rp 715.00
0.000 h.o Mandor Rp 163,000.00 Rp 40.75
Jumlah Upah Kerja ..... . Rp. 70,345.75
1.000 set Cylinder Rp 110,000.00 Rp 110,000.00
Jumlah Biaya Bahan ..... . Rp. 110,000.00
..... . Rp. 180,345.75
Overhead + Profit (10%) Rp. 18,034.58
Jumlah Total Rp. 198,380.33

1 bh Pasang lockcase
0.010 h.o Pekerja Rp 118,000.00 Rp 1,180.00
0.500 h.o Tukang kayu Rp 138,000.00 Rp 69,000.00
0.010 h.o Kepala tukang Rp 143,000.00 Rp 1,430.00
0.005 h.o Mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja ..... . Rp 72,425.00
1.000 set Lockcase Rp 253,000.00 Rp 253,000.00
Jumlah Biaya Bahan ..... . Rp 253,000.00
..... . Rp 325,425.00
Overhead + Profit (10%) Rp. 32,542.50
Jumlah Total Rp. 357,967.50

1 bh Pasang item kunci


0.015 h.o Pekerja Rp 118,000.00 Rp 1,770.00
0.150 h.o Tukang kayu Rp 138,000.00 Rp 20,700.00
0.015 h.o Kepala tukang Rp 143,000.00 Rp 2,145.00
0.001 h.o Mandor Rp 163,000.00 Rp 122.25
Jumlah Upah Kerja ..... . Rp. 24,737.25
1.000 bh Flush bolt Rp 198,000.00 Rp 198,000.00
1.000 bh Grendel gudang Rp 159,000.00 Rp 159,000.00
1.000 bh Escutcheon Rp 67,100.00 Rp 67,100.00
Jumlah Biaya Bahan Flush bolt ..... . 198,000.00
Jumlah Biaya Bahan Grendel gudang ..... . 159,000.00
Jumlah Biaya Bahan Escutcheon ..... . 67,100.00

Jumlah Total Flush bolt ..... . 222,737.25


Jumlah Total Grendel gudang ..... . 183,737.25
Jumlah Total Escutcheon ..... . 91,837.25

Jumlah Total Flush bolt verhead + Profit (10%) 245,010.98


Jumlah Total Grendel gudang verhead + Profit (10%) 202,110.98
Jumlah Total Escutcheon verhead + Profit (10%) 101,020.98

1 bh Pek. Pintu P1
5.080 m' Kusen Aluminium 4" Rp 43,645.00 Rp 221,716.60
1.648 m2 Daun pintu plywood Rp 408,135.00 Rp 672,606.48
1.443 m2 HPL Rp 47,336.50 Rp 68,297.10
0.205 m2 Kaca polos 5 mm Rp 24,737.25 Rp 5,076.08
4.000 bh Engsel panel stailessteel Rp 24,737.25 Rp 98,949.00
1.000 bh Lever handle Rp 82,457.50 Rp 82,457.50
1.000 set Cylinder Rp 70,345.75 Rp 70,345.75
1.000 set Lockcase Rp 72,425.00 Rp 72,425.00
Jumlah Upah Kerja …………………….. 1,291,873.52
5.080 m' Kusen Aluminium 4" Rp 105,000.00 Rp 533,400.00
1.648 m2 Daun pintu plywood Rp 407,100.00 Rp 670,900.80
1.443 m2 HPL Rp 71,275.41 Rp 102,836.16
0.205 m2 Kaca polos 5 mm Rp 180,750.00 Rp 37,089.90
4.000 bh Engsel panel stailessteel Rp 33,000.00 Rp 132,000.00
1.000 bh Lever handle Rp 319,000.00 Rp 319,000.00
1.000 set Cylinder Rp 110,000.00 Rp 110,000.00
1.000 set Lockcase Rp 253,000.00 Rp 253,000.00
Jumlah Biaya Bahan …………………. 2,158,226.86
Jumlah Total ………………….. 3,450,100.38
Overhead + Profit (10%) Rp. 345,010.04
Jumlah Total Rp. 3,795,110.41

1 bh Pek. Pintu P2
5.700 m' Kusen Aluminium 4" Rp 43,645.00 Rp 248,776.50
3.090 m2 Daun pintu plywood Rp 408,135.00 Rp 1,261,137.15
7.300 m' Aluminium 20x40 mm Rp 97,539.00 Rp 712,034.70
5.400 m' Hollow 20x20x1.2 mm Rp 4,568.85 Rp 24,671.79
3.400 m' Besi siku 20x20x3 mm Rp 11,965.20 Rp 40,681.68
2.910 m2 HPL Rp 47,336.50 Rp 137,749.22
0.180 m2 Kaca polos 5 mm Rp 24,737.25 Rp 4,452.71
4.000 bh Engsel panel stailessteel Rp 24,737.25 Rp 98,949.00
2.000 bh Full Handle Rp 82,457.50 Rp 164,915.00
1.000 set Cylinder Rp 70,345.75 Rp 70,345.75
1.000 bh Flush bolt Rp 24,737.25 Rp 24,737.25
1.000 set Lockcase Rp 72,425.00 Rp 72,425.00
Jumlah Upah Kerja …………………….. 2,860,875.74
5.700 m' Kusen Aluminium 4" Rp 105,000.00 Rp 598,500.00
3.090 m2 Daun pintu plywood Rp 407,100.00 Rp 1,257,939.00
7.300 m' Aluminium 20x40 mm Rp 20,833.33 Rp 152,083.33
5.400 m' Hollow 20x20x1.2 mm Rp 18,560.03 Rp 100,224.18
3.400 m' Besi siku 20x20x3 mm Rp 17,812.50 Rp 60,562.50
2.910 m2 HPL Rp 71,275.41 Rp 207,411.44
0.180 m2 Kaca polos 5 mm Rp 180,750.00 Rp 32,535.00
4.000 bh Engsel panel stailessteel Rp 33,000.00 Rp 132,000.00
2.000 bh Full Handle Rp 286,000.00 Rp 572,000.00
1.000 set Cylinder Rp 110,000.00 Rp 110,000.00
1.000 bh Flush bolt Rp 198,000.00 Rp 198,000.00
1.000 set Lockcase Rp 253,000.00 Rp 253,000.00
Jumlah Biaya Bahan …………………. 3,674,255.46
Jumlah Total ………………….. 6,535,131.20
Overhead + Profit (10%) Rp. 653,513.12
Jumlah Total Rp. 7,188,644.32

1 bh Pek. Pintu P3
5.080 m' Kusen Aluminium 4" Rp 43,645.00 Rp 221,716.60
2.266 m2 Daun pintu plywood Rp 408,135.00 Rp 924,833.91
2.061 m2 HPL Rp 47,336.50 Rp 97,551.06
0.205 m2 Kaca polos 5 mm Rp 24,737.25 Rp 5,076.08
4.000 bh Engsel panel stailessteel Rp 24,737.25 Rp 98,949.00
2.000 bh Lever handle Rp 82,457.50 Rp 164,915.00
1.000 set Cylinder Rp 70,345.75 Rp 70,345.75
1.000 bh Flush bolt Rp 24,737.25 Rp 24,737.25
1.000 set Door Closer Rp 82,457.50 Rp 82,457.50
Jumlah Upah Kerja …………………….. 1,690,582.15
5.080 m' Kusen Aluminium 4" Rp 105,000.00 Rp 533,400.00
2.266 m2 Daun pintu plywood Rp 407,100.00 Rp 922,488.60
2.061 m2 HPL Rp 71,275.41 Rp 146,884.36
0.205 m2 Kaca polos 5 mm Rp 24,737.25 Rp 5,076.08
4.000 bh Engsel panel stailessteel Rp 33,000.00 Rp 132,000.00
2.000 bh Lever handle Rp 319,000.00 Rp 638,000.00
1.000 set Cylinder Rp 110,000.00 Rp 110,000.00
1.000 bh Flush bolt Rp 198,000.00 Rp 198,000.00
1.000 set Door Closer Rp 250,000.00 Rp 250,000.00
Jumlah Biaya Bahan …………………. 2,935,849.05
Jumlah Total ………………….. 4,626,431.20
Overhead + Profit (10%) Rp. 462,643.12
Jumlah Total Rp. 5,089,074.32

1 bh Pek. Pintu P5
9.250 m2 Folding door Rp 284,662.60 Rp 2,633,129.05
Jumlah Upah Kerja …………………….. 2,633,129.05
9.250 m2 Folding door Rp 501,700.00 Rp 4,640,725.00
Jumlah Biaya Bahan …………………. 4,640,725.00
Jumlah Total ………………….. 7,273,854.05
Overhead + Profit (10%) Rp. 727,385.41
Jumlah Total Rp. 8,001,239.46

1 bh Pek. Pintu P6
6.600 m2 Folding door Rp 284,662.60 Rp 1,878,773.16
Jumlah Upah Kerja …………………….. 1,878,773.16
6.600 m2 Folding door Rp 501,700.00 Rp 3,311,220.00
Jumlah Biaya Bahan …………………. 3,311,220.00
Jumlah Total ………………….. 5,189,993.16
Overhead + Profit (10%) Rp. 518,999.32
Jumlah Total Rp. 5,708,992.48

1 bh Pek. Jendela
17.000 m' Kusen Aluminium 4" Rp 43,645.00 Rp 741,965.00
12.800 m' Aluminium 20x40 mm Rp 97,539.00 Rp 1,248,499.20
1.654 m2 Kaca polos 5 mm Rp 24,737.25 Rp 40,905.52
8.000 bh Engsel panel stailessteel Rp 33,000.00 Rp 264,000.00
4.000 bh Grendel jendela Rp 24,737.25 Rp 98,949.00
Jumlah Upah Kerja …………………….. 2,394,318.72
17.000 m' Kusen Aluminium 4" Rp 105,000.00 Rp 1,785,000.00
12.800 m' Aluminium 20x40 mm Rp 20,833.33 Rp 266,666.67
1.654 m2 Kaca polos 5 mm Rp 24,737.25 Rp 40,905.52
8.000 bh Engsel panel stailessteel Rp 33,000.00 Rp 264,000.00
4.000 bh Grendel jendela Rp 159,000.00 Rp 636,000.00
Jumlah Biaya Bahan …………………. 2,992,572.18
Jumlah Total ………………….. 5,386,890.90
Overhead + Profit (10%) Rp. 538,689.09
Jumlah Total Rp. 5,925,579.99

1 bh Pek. Ventilas V1
0.0101 m³ Kusen Kayu Rp 3,526,900.00 Rp 35,551.15
0.2090 m2 Kaca polos 5 mm Rp 24,737.25 Rp 5,170.09
Jumlah Upah Kerja …………………….. 40,721.24
0.0101 m' Kusen Kayu Rp 14,326,900.00 Rp 144,415.15
0.1800 m2 Kaca polos 5 mm Rp 180,750.00 Rp 32,535.00
Jumlah Biaya Bahan …………………….. 176,950.15
Jumlah Total ………………….. 217,671.39
Overhead + Profit (10%) Rp. 21,767.14
Jumlah Total Rp. 239,438.53

1 Kg Pasang rangka baja profil WF, C, I, L, O


0.060 h.o pekerja Rp 118,000.00 Rp 7,080.00
0.006 h.o tukang besi Rp 138,000.00 Rp 828.00
0.006 h.o kepala tukang Rp 143,000.00 Rp 858.00
0.000 h.o mandor Rp 163,000.00 Rp 48.90
Jumlah Upah Kerja . . Rp. 8,814.90

1.100 Kg Baja profil WF, C, I, L, O Rp 13,500.00 Rp 14,850.00


0.080 Kg Meni Besi Rp 35,000.00 Rp 2,800.00
Jumlah Biaya bahan . . Rp. 14,850.00
Jumlah Total . . Rp. 23,664.90
1 m' Pasang Profil Baja IWF 400x200x8x13 mm
1.715 h.o Pekerja Rp 118,000.00 Rp 202,415.08
0.172 h.o Tukang Besi / Las Rp 138,000.00 Rp 23,672.27
0.029 h.o Kepala tukang Rp 143,000.00 Rp 4,088.33
0.006 h.o Mandor Rp 163,000.00 Rp 932.02
Jumlah Upah Kerja ..... . Rp 231,107.70
0.083 Btg IWF 400x200x8x13 mm Rp 12,560,000.00 Rp 1,046,666.67
1.000 ls Material las (2% Bp) Rp 251,200.00 Rp 251,200.00
0.544 kg Meni besi Rp 35,000.00 Rp 19,040.00
Jumlah Biaya Bahan ..... . Rp 1,316,906.67
Jumlah Total ..... . Rp 1,548,014.37
Overhead + Profit (10%) Rp. 154,801.44
Jumlah Total Rp. 1,702,815.80

1 m' Pasang Profil Baja IWF 200x100x5.5x8 mm


1.715 h.o Pekerja Rp 118,000.00 Rp 202,415.08
0.172 h.o Tukang Besi / Las Rp 138,000.00 Rp 23,672.27
0.029 h.o Kepala tukang Rp 143,000.00 Rp 4,088.33
0.006 h.o Mandor Rp 163,000.00 Rp 932.02
Jumlah Upah Kerja ..... . Rp 231,107.70
0.083 Btg IWF 200x100x5.5x8 mm Rp 2,604,000.00 Rp 217,000.00
1.000 ls Material las (2% Bp) Rp 52,080.00 Rp 52,080.00
0.544 kg Meni besi Rp 35,000.00 Rp 19,040.00
Jumlah Biaya Bahan ..... . Rp 288,120.00
Jumlah Total ..... . Rp 519,227.70
Overhead + Profit (10%) Rp. 51,922.77
Jumlah Total Rp. 571,150.47

1 m' Pasang Pipa baja 6"


0.964 h.o Pekerja Rp 118,000.00 Rp 113,775.60
0.096 h.o Tukang Besi / Las Rp 138,000.00 Rp 13,305.96
0.016 h.o Kepala tukang Rp 143,000.00 Rp 2,298.01
0.003 h.o Mandor Rp 163,000.00 Rp 523.88
Jumlah Upah Kerja ..... . Rp 129,903.45
0.167 Btg Pipa baja 6", 6.02 mm Rp 1,860,000.00 Rp 310,000.00
1.000 ls Material las (2% Bp) Rp 37,200.00 Rp 37,200.00
Jumlah Biaya Bahan ..... . Rp 347,200.00
Jumlah Total ..... . Rp 477,103.45
Overhead + Profit (10%) Rp. 47,710.35
Jumlah Total Rp. 524,813.80

1 m' Pek. Pipa baja 3", 5.49 mm


0.677 h.o Pekerja Rp 118,000.00 79,933.20
0.068 h.o Tukang Besi / Las Rp 138,000.00 9,348.12
0.011 h.o Kepala tukang Rp 143,000.00 1,614.47
0.002 h.o Mandor Rp 163,000.00 368.05
Jumlah Upah Kerja ..... . 91,263.84
0.167 Btg Pipa baja 3", 3.91 mm Rp 298,000.00 49,666.67
1.000 ls Material las (2% Bp) Rp 5,960.00 5,960.00
Jumlah Biaya Bahan ..... . 55,626.67
Jumlah Total ..... . 146,890.51

1 m' Pasang Pipa baja 2", 3.91 mm


0.326 h.o Pekerja Rp 118,000.00 38,515.20
0.033 h.o Tukang Besi / Las Rp 138,000.00 4,498.80
0.005 h.o Kepala tukang Rp 143,000.00 772.20
0.001 h.o Mandor Rp 163,000.00 179.30
Jumlah Upah Kerja ..... . 43,965.50
0.167 Btg Pipa baja 2", 3.91 mm Rp 254,000.00 42,341.80
1.000 ls Material las (2% Bp) Rp 14,260.82 14,260.82
Jumlah Biaya Bahan ..... . 56,602.62
Jumlah Total ..... . 100,568.12

1 m' Pek. CNP 150x50x20x2.3 mm


0.330 h.o Pekerja Rp 118,000.00 Rp 38,940.00
0.033 h.o Tukang Besi / Las Rp 138,000.00 Rp 4,554.00
0.006 h.o Kepala tukang Rp 143,000.00 Rp 786.50
0.001 h.o Mandor Rp 163,000.00 Rp 179.30
Jumlah Upah Kerja ..... . Rp 44,459.80
1.000 m' CNP 150x50x20x2.3 mm Rp 59,583.33 Rp 59,583.33
1.000 ls Material bantu (2%) Rp 1,191.67 Rp 1,191.67
Jumlah Biaya Bahan ..... . Rp 60,775.00
Jumlah Total ..... . Rp 105,234.80
Overhead + Profit (10%) Rp. 10,523.48
Jumlah Total Rp. 115,758.28
1 kg Pasang plat baja
0.060 h.o Pekerja Rp 118,000.00 Rp 7,080.00
0.006 h.o Tukang Besi / Las Rp 138,000.00 Rp 828.00
0.001 h.o Kepala tukang Rp 143,000.00 Rp 143.00
0.000 h.o Mandor Rp 163,000.00 Rp 32.60
Jumlah Upah Kerja ..... . Rp 8,083.60
1.050 kg Baja Plat Rp 12,000.00 Rp 12,600.00
1.000 ls Material las 5% Bp) Rp 600.00 Rp 600.00
Jumlah Biaya Bahan ..... . Rp 13,200.00
Jumlah Total ..... . Rp 21,283.60
Overhead + Profit (10%) Rp. 2,128.36
Jumlah Total Rp. 23,411.96

1 kg Pasang baut angker baja


0.020 h.o Pekerja Rp 118,000.00 Rp 2,360.00
0.030 h.o Tukang besi Rp 138,000.00 Rp 4,140.00
0.003 h.o Kepala tukang Rp 143,000.00 Rp 429.00
0.000 h.o Mandor Rp 163,000.00 Rp 32.60
Jumlah Upah Kerja ..... . Rp 6,961.60
1.000 kg Angker bar Rp 36,800.00 Rp 36,800.00
1.040 kg Baut segala ukuran Rp 21,200.00 Rp 22,048.00
Jumlah Biaya Bahan ..... . Rp 58,848.00
Jumlah Total ..... . Rp 65,809.60
Overhead + Profit (10%) Rp. 6,580.96
Jumlah Total Rp. 72,390.56

1 cm Pengelasan
0.003 h.o Pekerja Rp 118,000.00 Rp 374.65
0.002 h.o Tukang las Rp 138,000.00 Rp 219.01
0.000 h.o Kepala tukang las Rp 143,000.00 Rp 22.69
Jumlah Upah Kerja ..... . Rp 616.35
0.008 kg Kawat las Rp 135,000.00 Rp 1,080.00
0.002 h.a Mesin las listrik komplit termasuk spare p Rp 1,000,000.00 Rp 1,587.00
Jumlah Biaya Bahan & Peralatan ..... . Rp 2,667.00
Jumlah Total ..... . Rp 3,283.35
Overhead + Profit (10%) Rp. 328.34
Jumlah Total Rp. 3,611.69

1 bh baut HTB M16


0.006 h.o Pekerja Rp 118,000.00 Rp 708.00
Jumlah Upah Kerja ..... . Rp 708.00
1.000 bh Baut dia.16 mm Rp 23,200.00 Rp 23,200.00
Jumlah Biaya Bahan & Peralatan ..... . Rp 23,200.00
..... . Rp 23,908.00
Overhead + Profit (10%) Rp. 2,390.80
Jumlah Total Rp. 26,298.80

1 bh baut M8
0.006 h.o Pekerja Rp 118,000.00 Rp 708.00
Jumlah Upah Kerja ..... . Rp 708.00
1.000 bh Baut dia.8 mm Rp 5,100.00 Rp 5,100.00
Jumlah Biaya Bahan & Peralatan ..... . Rp 5,100.00
..... . Rp 5,808.00
Overhead + Profit (10%) Rp. 580.80
Jumlah Total Rp. 6,388.80

1 bh Pekerjaan jarum keras


0.006 h.o Pekerja Rp 118,000.00 Rp 708.00
Jumlah Upah Kerja ..... . Rp 708.00
1.000 bh Jarum Keras M16 Rp 41,250.00 Rp 41,250.00
1.000 ls Acc Rp 25,000.00 Rp 25,000.00
Jumlah Biaya Bahan & Peralatan ..... . Rp 66,250.00
..... . Rp 66,958.00
Overhead + Profit (10%) Rp. 6,695.80
Jumlah Total Rp. 73,653.80

1 m2 Pasang pintu besi/baja


0.650 h.o pekerja Rp 118,000.00 Rp 76,700.00
0.650 h.o tukang besi Rp 138,000.00 Rp 89,700.00
0.065 h.o kepala tukang Rp 143,000.00 Rp 9,295.00
0.032 h.o mandor Rp 163,000.00 Rp 5,216.00
Jumlah Upah Kerja . . Rp. 180,911.00
1.000 m2 Pintu besi baja Rp 800,000.00 Rp 800,000.00
Jumlah Biaya bahan . . Rp. 800,000.00
. . Rp. 980,911.00
Overhead + Profit (10%) Rp. 98,091.10
Jumlah Total Rp. 1,079,002.10

1 m2 Pasang jendela besi


1.050 h.o pekerja Rp 118,000.00 Rp 123,900.00
1.050 h.o tukang besi Rp 138,000.00 Rp 144,900.00
0.105 h.o kepala tukang Rp 143,000.00 Rp 15,015.00
0.005 h.o mandor Rp 163,000.00 Rp 855.75
Jumlah Upah Kerja . . Rp. 284,670.75
1.000 m2 Jendela besi Rp 550,000.00 Rp 550,000.00
Jumlah Biaya bahan . . Rp. 550,000.00
. . Rp. 834,670.75
Overhead + Profit (10%) Rp. 83,467.08
Jumlah Total Rp. 918,137.83

1 m2 Pasang pintu gulung besi


1.200 h.o pekerja Rp 118,000.00 Rp 141,600.00
1.200 h.o tukang besi Rp 138,000.00 Rp 165,600.00
0.120 h.o kepala tukang Rp 143,000.00 Rp 17,160.00
0.006 h.o mandor Rp 163,000.00 Rp 978.00
Jumlah Upah Kerja . . Rp. 325,338.00
1.000 m2 Pintu gulung besi Rp 800,000.00 Rp 800,000.00
Jumlah Biaya bahan . . Rp. 800,000.00
. . Rp. 1,125,338.00
Overhead + Profit (10%) Rp. 112,533.80
Jumlah Total Rp. 1,237,871.80

1 m2 Pasang pintu lipat besi / pintu aluminium


1.050 h.o pekerja Rp 118,000.00 Rp 123,900.00
1.050 h.o tukang besi Rp 138,000.00 Rp 144,900.00
0.105 h.o kepala tukang Rp 143,000.00 Rp 15,015.00
0.005 h.o mandor Rp 163,000.00 Rp 847.60
Jumlah Upah Kerja . . Rp. 284,662.60
1.000 m2 Pintu lipat besi / pintu aluminium Rp 250,000.00 Rp 250,000.00
Jumlah Biaya bahan . . Rp. 250,000.00
. . Rp. 534,662.60
Overhead + Profit (10%) Rp. 53,466.26
Jumlah Total Rp. 588,128.86

1 m2 Pasang rolling door


1.050 h.o pekerja Rp 118,000.00 Rp 123,900.00
1.500 h.o tukang besi Rp 138,000.00 Rp 207,000.00
0.105 h.o kepala tukang Rp 143,000.00 Rp 15,015.00
0.005 h.o mandor Rp 163,000.00 Rp 847.60
Jumlah Upah Kerja . . Rp. 346,762.60
1.000 m2 Roll door Rp 250,000.00 Rp 250,000.00
Jumlah Biaya bahan . . Rp. 250,000.00
. . Rp. 596,762.60
Overhead + Profit (10%) Rp. 59,676.26
Jumlah Total Rp. 656,438.86

1 m2 Pasang folding door


1.050 h.o pekerja Rp 118,000.00 Rp 123,900.00
1.050 h.o tukang besi Rp 138,000.00 Rp 144,900.00
0.105 h.o kepala tukang Rp 143,000.00 Rp 15,015.00
0.005 h.o mandor Rp 163,000.00 Rp 847.60
Jumlah Upah Kerja . . Rp. 284,662.60
1.000 m2 Folding door Rp 501,700.00 Rp 501,700.00
Jumlah Biaya bahan . . Rp. 501,700.00
. . Rp. 786,362.60
Overhead + Profit (10%) Rp. 78,636.26
Jumlah Total Rp. 864,998.86

1 m2 Pasang jendela nako dan tralis


0.200 h.o pekerja Rp 118,000.00 Rp 23,600.00
0.200 h.o tukang kayu Rp 138,000.00 Rp 27,600.00
0.020 h.o kepala tukang Rp 143,000.00 Rp 2,860.00
0.001 h.o mandor Rp 163,000.00 Rp 163.00
Jumlah Upah Kerja . . Rp. 54,223.00
1.100 m2 Kaca nako 5mm Rp 104,000.00 Rp 114,400.00
0.020 kg Paku biasa 1/2" - 1" atau sekrup Rp 22,000.00 Rp 440.00
0.025 m2 Besi strip Rp 45,000.00 Rp 1,125.00
Jumlah Biaya bahan . . Rp. 115,965.00
. . Rp. 170,188.00
Overhead + Profit (10%) Rp. 17,018.80
Jumlah Total Rp. 187,206.80

1 m2 Pasang terali besi


1.200 h.o pekerja Rp 118,000.00 Rp 141,600.00
1.200 h.o tukang besi Rp 138,000.00 Rp 165,600.00
0.012 h.o kepala tukang Rp 143,000.00 Rp 1,716.00
0.001 h.o mandor Rp 163,000.00 Rp 97.80
Jumlah Upah Kerja . . Rp. 309,013.80
11.500 m' Besi strip 2 x 3 Rp 22,000.00 Rp 253,000.00
Jumlah Biaya bahan . . Rp. 253,000.00
. . Rp. 562,013.80
Overhead + Profit (10%) Rp. 56,201.38
Jumlah Total Rp. 618,215.18

1 m2 Pasang kawat (harmonika, nyamuk, kassa, burung)


0.100 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.100 h.o tukang kayu Rp 138,000.00 Rp 13,800.00
0.010 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.001 h.o mandor Rp 163,000.00 Rp 81.50
Jumlah Upah Kerja . . Rp. 27,111.50
1.100 m2 Kawat (harmonika,nyamuk,kassa,burung) Rp 35,000.00 Rp 38,500.00
0.020 kg Paku biasa 1/2" - 1" Rp 20,000.00 Rp 400.00
0.002 m3 Papan kayu kelas I/II Rp 3,780,000.00 Rp 6,804.00
Jumlah Biaya bahan . . Rp. 45,704.00
. . Rp. 72,815.50
Overhead + Profit (10%) Rp. 7,281.55
Jumlah Total Rp. 80,097.05

1 m' Pasang Rangka Aluminium


0.078 h.o pekerja Rp 118,000.00 Rp 9,145.00
0.250 h.o tukang Aluminium Rp 138,000.00 Rp 34,500.00
Jumlah Upah Kerja . . Rp. 43,645.00
1.100 m' Profil Aluminium Rp 90,000.00 Rp 99,000.00
10.000 bh Mur Rp 600.00 Rp 6,000.00
Jumlah Biaya bahan . . Rp. 105,000.00
Jumlah Total . . Rp. 148,645.00
Overhead + Profit (10%) Rp. 14,864.50
Jumlah Total Rp. 163,509.50

1 m2 Pasang Rangka Hollow 1 x 2


0.850 h.o pekerja Rp 118,000.00 Rp 100,300.00
0.400 h.o tukang aluminium Rp 138,000.00 Rp 55,200.00
0.004 h.o kepala tukang Rp 143,000.00 Rp 572.00
0.004 h.o mandor Rp 163,000.00 Rp 652.00
Jumlah Upah Kerja . . Rp. 156,724.00
1.100 m2 Hollow 1 x 2 Rp 12,500.00 Rp 13,750.00
10.000 bh Skrup Rp 600.00 Rp 6,000.00
2.000 bh Spikot Rp 2,000.00 Rp 4,000.00
Jumlah Biaya bahan . . Rp. 23,750.00
Jumlah Total . . Rp. 180,474.00
Overhead + Profit (10%) Rp. 18,047.40
Jumlah Total Rp. 198,521.40

1 m2 Pasang Rangka Hollow 1 x 2


0.850 h.o pekerja Rp 118,000.00 Rp 100,300.00
0.400 h.o tukang aluminium Rp 138,000.00 Rp 55,200.00
0.004 h.o kepala tukang Rp 143,000.00 Rp 572.00
0.004 h.o mandor Rp 163,000.00 Rp 652.00
Jumlah Upah Kerja . . Rp. 156,724.00
1.100 m2 Hollow 1 x 2 Rp 12,500.00 Rp 13,750.00
10.000 bh Skrup Rp 1,000.00 Rp 10,000.00
2.000 bh Spikot Rp 1,000.00 Rp 2,000.00
Jumlah Biaya bahan . . Rp. 25,750.00
Jumlah Total . . Rp. 182,474.00
Overhead + Profit (10%) Rp. 18,247.40
Jumlah Total Rp. 200,721.40

1 m2 Pasang Rangka Hollow 1 x 40.20.3mm


0.350 h.o pekerja Rp 118,000.00 Rp 41,300.00
0.350 h.o tukang aluminium Rp 138,000.00 Rp 48,300.00
0.035 h.o kepala tukang Rp 143,000.00 Rp 5,005.00
0.018 h.o mandor Rp 163,000.00 Rp 2,934.00
Jumlah Upah Kerja . . Rp. 97,539.00
4.000 m Hollow 40.20.3 mm Rp 4,166.67 Rp 16,666.67
1.000 ls Aksesories Rp 4,166.67 Rp 4,166.67
Jumlah Biaya bahan . . Rp. 20,833.33
. . Rp. 118,372.33
Overhead + Profit (10%) Rp. 11,837.23
Jumlah Total Rp. 130,209.57

1 m' Pasang hollow 40x40x0.8 mm


0.060 h.o Pekerja Rp 118,000.00 Rp 7,113.98
0.006 h.o Tukang Besi / Las Rp 138,000.00 Rp 831.97
0.001 h.o Kepala tukang Rp 143,000.00 Rp 143.69
0.000 h.o Mandor Rp 163,000.00 Rp 32.76
Jumlah Upah Kerja ..... . Rp. 8,122.40
0.167 Btg Hollow 40x40x0.8 mm Rp 135,000.00 22,500.00
1.000 ls Material las (2% Bp) Rp 2,700.00 Rp 2,700.00
0.040 kg Meni besi Rp 35,000.00 Rp 1,406.72
Jumlah Biaya Bahan ..... . Rp. 26,606.72
Jumlah Total ..... . 34,729.12
Overhead + Profit (10%) Rp. 3,472.91
Jumlah Total Rp. 38,202.03

1 m' Pasang hollow 20x40x0.6 mm


0.034 h.o Pekerja Rp 118,000.00 4,001.62
0.003 h.o Tukang Besi / Las Rp 138,000.00 Rp 467.99
0.001 h.o Kepala tukang Rp 143,000.00 Rp 80.82
0.000 h.o Mandor Rp 163,000.00 Rp 18.43
Jumlah Upah Kerja ..... . Rp 4,568.85
0.167 Btg 20x40x0.6 mm Rp 95,000.00 Rp 15,833.33
1.000 ls Material las (2% Bp) Rp 1,900.00 Rp 1,900.00
0.024 kg Meni besi Rp 35,000.00 Rp 826.70
Jumlah Biaya Bahan ..... . Rp 18,560.03
..... . Rp. 23,128.88
Overhead + Profit (10%) Rp. 2,312.89
Jumlah Total Rp. 25,441.77

1 m2 Pasang Pintu Dorong Kaca


0.250 h.o pekerja Rp 118,000.00 Rp 29,500.00
0.375 h.o tukang aluminium Rp 138,000.00 Rp 51,750.00
0.038 h.o kepala tukang Rp 143,000.00 Rp 5,362.50
0.020 h.o mandor Rp 163,000.00 Rp 3,260.00
Jumlah Upah Kerja . . Rp. 89,872.50
1.100 m2 Kaca tebal …. mm Rp 320,000.00 Rp 352,000.00
4.000 m' Karet list Rp 77,000.00 Rp 308,000.00
0.050 kg Lem kaca Rp 28,000.00 Rp 1,400.00
3.000 m' Profil Aluminium Rp 90,000.00 Rp 270,000.00
6.000 bh Mur Rp 600.00 Rp 3,600.00
Jumlah Biaya bahan . . Rp. 935,000.00
. . Rp. 1,024,872.50
Overhead + Profit (10%) Rp. 102,487.25
Jumlah Total Rp. 1,127,359.75

1 buah Pasang rel pintu dorong


0.060 h.o pekerja Rp 118,000.00 Rp 7,080.00
0.600 h.o tukang besi Rp 138,000.00 Rp 82,800.00
0.060 h.o kepala tukang Rp 143,000.00 Rp 8,580.00
0.003 h.o mandor Rp 163,000.00 Rp 489.00
Jumlah Upah Kerja . . Rp. 98,949.00
1.000 set rel pintu dorong Rp 1,100,000.00 Rp 1,100,000.00
Jumlah Biaya bahan . . Rp. 1,100,000.00
. . Rp. 1,198,949.00
Overhead + Profit (10%) Rp. 119,894.90
Jumlah Total Rp. 1,318,843.90

1 m' Pasang talang datar seng BJLS


0.150 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.400 h.o tukang kayu Rp 138,000.00 Rp. 55,200.00
0.025 h.o kepala tukang Rp 143,000.00 Rp. 3,575.00
0.001 h.o mandor Rp 163,000.00 Rp. 203.75
Jumlah Upah Kerja . . Rp 76,678.75
0.500 lbr Seng pelat 3' x 6' BJLS 28 Rp. 61,000.00 Rp. 30,500.00
0.015 kg Paku biasa 1/2" - 1" Rp. 20,000.00 Rp. 300.00
0.010 m3 Papan kayu Rp. 2,182,000.00 Rp. 20,947.20
0.250 kg Besi strip Rp. 22,000.00 Rp. 5,500.00
Jumlah Biaya Bahan . . Rp 36,300.00
. . Rp. 112,978.75
Overhead + Profit (10%) . Rp 16,946.81
Jumlah Total . Rp 129,925.56

1 m' Pasang talang miring seng BJLS


0.150 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.400 h.o tukang kayu Rp 138,000.00 Rp. 55,200.00
0.025 h.o kepala tukang Rp 143,000.00 Rp. 3,575.00
0.001 h.o mandor Rp 163,000.00 Rp. 203.75
Jumlah Upah Kerja . . Rp 76,678.75
0.500 lbr Seng pelat 3' x 6' BJLS 28 Rp. 61,000.00 Rp. 30,500.00
0.015 kg Paku biasa 1/2" - 1" Rp. 20,000.00 Rp. 300.00
0.019 m3 Papan kayu Rp. 2,182,000.00 Rp. 41,458.00
0.300 kg Besi strip Rp. 22,000.00 Rp. 6,600.00
Jumlah Biaya Bahan . . Rp 78,858.00
. . Rp. 155,536.75
Overhead + Profit (10%) . Rp 23,330.51
Jumlah Total . Rp 178,867.26

1 m' Pasang talang 1/2 lingkaran D-10cm, seng BJLS


0.150 h.o pekerja Rp 118,000.00 Rp. 17,700.00
0.250 h.o tukang kayu Rp 138,000.00 Rp. 34,500.00
0.025 h.o kepala tukang Rp 143,000.00 Rp. 3,575.00
0.001 h.o mandor Rp 163,000.00 Rp. 203.75
Jumlah Upah Kerja . . Rp 55,978.75
0.300 lbr Seng pelat 3' x 6' BJLS 28 Rp. 61,000.00 Rp. 18,300.00
0.100 kg Paku biasa 1/2" - 1" Rp. 20,000.00 Rp. 2,000.00
0.019 m3 Papan kayu Rp. 2,182,000.00 Rp. 41,458.00
0.500 kg Besi strip Rp. 22,000.00 Rp. 11,000.00
Jumlah Biaya Bahan . . Rp 72,758.00
. . Rp. 128,736.75
Overhead + Profit (10%) . Rp 19,310.51
Jumlah Total . Rp 148,047.26

1 m² Pasang aluminium foil/sisalition


0.150 h.o Pekerja Rp 118,000.00 Rp 17,700.00
0.050 h.o Tukang Rp 138,000.00 Rp 6,900.00
0.005 h.o Kepala Tukang Rp 143,000.00 Rp 715.00
0.008 h.o Mandor Rp 163,000.00 Rp 1,304.00
Jumlah Upah Kerja ..... . Rp 26,619.00
1.050 m2 aluminium foil Rp 9,300.00 Rp 9,765.00
Jumlah Biaya Bahan ..... . Rp 9,765.00
..... . Rp 36,384.00
Overhead + Profit (10%) . Rp 5,457.60
Jumlah Total . Rp 41,841.60

1 m' Pasang profil aluminium siku 20x20x3 mm


0.043 h.o Pekerja Rp 118,000.00 Rp 5,074.00
0.043 h.o Tukang kayu Rp 138,000.00 Rp 5,934.00
0.004 h.o Kepala tukang Rp 143,000.00 Rp 614.90
0.002 h.o Mandor Rp 163,000.00 Rp 342.30
Jumlah Upah Kerja ..... . Rp 11,965.20
1.050 m' Aluminium siku 20x20x3 mm Rp 11,250.00 Rp 11,812.50
10.000 bh Mur Rp 600.00 Rp 6,000.00
Jumlah Biaya Bahan ..... . Rp 17,812.50
..... . Rp 29,777.70
Overhead + Profit (10%) Rp. 2,977.77
Jumlah Total Rp. 32,755.47

1 m2 Pasang Alucopan 0.3 (4) mm


1.500 h.o Pekerja Rp 118,000.00 Rp 177,000.00
0.750 h.o Tukang aluminium Rp 138,000.00 Rp 103,500.00
0.075 h.o Kepala tukang Rp 143,000.00 Rp 10,725.00
0.008 h.o Mandor Rp 163,000.00 Rp 1,222.50
Jumlah Upah Kerja ..... …………………….. Rp 292,447.50
1.050 m2 Alucopan 0.3 (4) mm Polyester Rp 145,726.96 Rp 153,013.30
1.600 m' Alumunium Stifner panel Rp 75,000.00 Rp 120,000.00
1.400 m' Alumunium. Siku 30x16 Rp 75,000.00 Rp 105,000.00
2.100 kg Bracket besi siku 70.70.7 Rp 12,000.00 Rp 25,200.00
2.000 bh Dynabolt M 10 x 120 Rp 5,000.00 Rp 10,000.00
2.000 bh Mur + baut M 10 x 70 Rp 2,031.00 Rp 4,062.00
0.067 kg Zincromate Rp 50,000.00 Rp 3,333.33
0.250 tube Sealant Rp 105,000.00 Rp 26,250.00
4.000 bh Ramsel Nails Rp 5,000.00 Rp 20,000.00
Jumlah Biaya Bahan ..... . Rp 466,858.64
Jumlah Upah & Bahan ..... . Rp 759,306.14
Overhead + Profit (10%) . Rp 75,930.61
Jumlah Total . Rp 835,236.75

1 m² Pasang aluminium perforated


0.080 h.o Pekerja Rp 118,000.00 Rp 9,440.00
0.800 h.o Tukang Rp 138,000.00 Rp 110,400.00
0.080 h.o Kepala Tukang Rp 143,000.00 Rp 11,440.00
0.004 h.o Mandor Rp 163,000.00 Rp 652.00
Jumlah Upah Kerja ..... . Rp 131,932.00
1.200 m2 aluminium perforated Rp 413,380.00 Rp 496,056.00
Jumlah Biaya Bahan ..... . Rp 496,056.00
Jumlah Upah & Bahan ..... . Rp 627,988.00
Overhead + Profit (10%) . Rp 62,798.80
Jumlah Total . Rp 690,786.80

1 buah Pasang Kloset Duduk


3.300 h.o pekerja Rp 118,000.00 Rp 389,400.00
1.100 h.o tukang batu Rp 138,000.00 Rp 151,800.00
0.010 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.160 h.o mandor Rp 163,000.00 Rp 26,080.00
Jumlah Upah Kerja . . Rp. 568,710.00
1.000 bh Kloset duduk Rp 2,250,000.00 Rp 2,250,000.00
1.000 ls Perlengkapan 6% harga kloset Rp 135,000.00 Rp 135,000.00
Jumlah Biaya bahan . . Rp. 2,385,000.00
. . Rp. 2,953,710.00
Overhead + Profit (10%) Rp. 295,371.00
Jumlah Total Rp. 3,249,081.00

1 buah Pasang Kloset Jongkok Porselen


1.000 h.o pekerja Rp 118,000.00 Rp 118,000.00
1.500 h.o tukang batu Rp 138,000.00 Rp 207,000.00
1.500 h.o kepala tukang Rp 143,000.00 Rp 214,500.00
0.160 h.o mandor Rp 163,000.00 Rp 26,080.00
Jumlah Upah Kerja . . Rp. 565,580.00
1.000 bh Kloset jongkok porselen Rp 300,000.00 Rp 300,000.00
0.120 sak Semen portland 50kg Rp 58,000.00 Rp 6,960.00
0.010 m3 Pasir pasang Rp 165,000.00 Rp 1,650.00
Jumlah Biaya bahan . . Rp. 306,960.00
. . Rp. 872,540.00
Overhead + Profit (10%) Rp. 87,254.00
Jumlah Total Rp. 959,794.00

1 buah Pasang Kloset Jongkok Teraso


1.000 h.o pekerja Rp 118,000.00 Rp 118,000.00
1.500 h.o tukang batu Rp 138,000.00 Rp 207,000.00
0.300 h.o kepala tukang Rp 143,000.00 Rp 42,900.00
0.110 h.o mandor Rp 163,000.00 Rp 17,930.00
Jumlah Upah Kerja . . Rp. 385,830.00
1.000 bh Kloset jongkok teraso Rp 50,000.00 Rp 50,000.00
7.000 bh Bata merah 5 x 11 x 22 cm Rp 600.00 Rp 4,200.00
0.120 sak Semen portland 50kg Rp 58,000.00 Rp 6,960.00
0.010 m3 Pasir pasang Rp 165,000.00 Rp 1,650.00
Jumlah Biaya bahan . . Rp. 62,810.00
. . Rp. 448,640.00
Overhead + Profit (10%) Rp. 44,864.00
Jumlah Total Rp. 493,504.00

1 buah Pasang Urinoir


1.000 h.o pekerja Rp 118,000.00 Rp 118,000.00
1.000 h.o tukang batu Rp 138,000.00 Rp 138,000.00
0.100 h.o kepala tukang Rp 143,000.00 Rp 14,300.00
0.050 h.o mandor Rp 163,000.00 Rp 8,150.00
Jumlah Upah Kerja . . Rp. 278,450.00
1.000 bh Urinoir Rp 1,780,000.00 Rp 1,780,000.00
1.000 ls Perlengkapan 30% harga urinoir Rp 534,000.00 Rp 534,000.00
0.120 sak Semen portland 50kg Rp 58,000.00 Rp 6,960.00
0.010 m3 Pasir pasang Rp 165,000.00 Rp 1,650.00
Jumlah Biaya bahan . . Rp. 2,322,610.00
. . Rp. 2,601,060.00
Overhead + Profit (10%) Rp. 260,106.00
Jumlah Total Rp. 2,861,166.00

1 buah Memasang jet washer


0.010 h.o Pekerja Rp 118,000.00 Rp 1,180.00
0.100 h.o Tukang batu Rp 138,000.00 Rp 13,800.00
0.010 h.o Kepala tukang Rp 143,000.00 Rp 1,430.00
0.005 h.o Mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja ..... . 17,225.00
1.000 bh Jet washer Rp 195,000.00 195,000.00
0.025 bh Seal tape Rp 14,000.00 350.00
Jumlah Biaya Bahan ..... . 195,350.00
..... . 212,575.00
Overhead + Profit (10%) Rp. 21,257.50
Jumlah Total Rp. 233,832.50

1 buah Pasang Floor drain


0.100 h.o pekerja Rp 118,000.00 Rp 11,800.00
0.010 h.o tukang batu Rp 138,000.00 Rp 1,380.00
0.100 h.o kepala tukang Rp 143,000.00 Rp 14,300.00
0.005 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . Rp. 28,295.00
1.000 bh Floor drain Rp 105,000.00 Rp 105,000.00
Jumlah Biaya bahan . . Rp. 105,000.00
. . Rp. 133,295.00
Overhead + Profit (10%) Rp. 13,329.50
Jumlah Total Rp. 146,624.50

1 buah Pasang Wastafel


1.200 h.o pekerja Rp 118,000.00 Rp 141,600.00
1.450 h.o tukang batu Rp 138,000.00 Rp 200,100.00
0.150 h.o kepala tukang Rp 143,000.00 Rp 21,450.00
0.060 h.o mandor Rp 163,000.00 Rp 9,780.00
Jumlah Upah Kerja . . Rp. 372,930.00
1.000 bh Wastafel Rp 643,500.00 Rp 643,500.00
1.000 ls Perlengkapan 12% harga wastafel Rp 77,220.00 Rp 77,220.00
0.120 sak Semen portland 50kg Rp 58,000.00 Rp 6,960.00
0.010 m3 Pasir pasang Rp 165,000.00 Rp 1,650.00
Jumlah Biaya bahan . . Rp. 729,330.00
. . Rp. 1,102,260.00
Overhead + Profit (10%) Rp. 110,226.00
Jumlah Total Rp. 1,212,486.00

1 buah pasang roof drain


0.1320 h.o Pekerja Rp 118,000.00 Rp 15,576.00
0.0220 h.o Tukang batu Rp 138,000.00 Rp 3,036.00
0.0020 h.o Kepala tukang Rp 143,000.00 Rp 286.00
0.0070 h.o Mandor Rp 163,000.00 Rp 1,141.00
Jumlah Upah Kerja .................................... 20,039.00
1.0000 bh Roof drain Rp 35,000.00 Rp 35,000.00
Jumlah Biaya Bahan .................................... Rp 35,000.00
Jumlah Total .................................... Rp 55,039.00
Overhead + Profit (10%) Rp. 5,503.90
Jumlah Total Rp. 60,542.90

1 m' Memasang pipa galvanis diameter 1/2" - 1"


0.054 h.o pekerja Rp 118,000.00 Rp 6,372.00
0.090 h.o tukang pipa Rp 138,000.00 Rp 12,420.00
0.009 h.o kepala tukang Rp 143,000.00 Rp 1,287.00
0.027 h.o mandor Rp 163,000.00 Rp 4,401.00
Jumlah Upah Kerja . . Rp. 24,480.00
1.200 m' Pipa galvanis f 1/2 " - 1" Rp 24,166.67 Rp 29,000.00
1.000 ls Perlengkapan ( 35% harga pipa ) Rp 8,458.33 Rp 8,458.33
Jumlah Biaya bahan . . Rp. 37,458.33
Jumlah Total . . Rp. 61,938.33
Overhead + Profit (10%) Rp. 6,193.83
Jumlah Total Rp. 68,132.17

1 m' Memasang pipa galvanis diameter 11/2" - 3"


0.108 h.o pekerja Rp 118,000.00 Rp 12,744.00
0.180 h.o tukang pipa Rp 138,000.00 Rp 24,840.00
0.018 h.o kepala tukang Rp 143,000.00 Rp 2,574.00
0.005 h.o mandor Rp 163,000.00 Rp 880.20
Jumlah Upah Kerja . . Rp. 41,038.20
1.200 m' Pipa galvanis Rp 68,000.00 Rp 81,600.00
1.000 ls Perlengkapan ( 35% harga pipa ) Rp 23,800.00 Rp 23,800.00
Jumlah Biaya bahan . . Rp. 105,400.00
. . Rp. 146,438.20
Overhead + Profit (10%) Rp. 14,643.82
Jumlah Total Rp. 161,082.02

1 m' Memasang pipa galvanis diameter 3"


0.135 h.o pekerja Rp 118,000.00 Rp 15,930.00
0.225 h.o tukang pipa Rp 138,000.00 Rp 31,050.00
0.023 h.o kepala tukang Rp 143,000.00 Rp 3,217.50
0.007 h.o mandor Rp 163,000.00 Rp 1,108.40
Jumlah Upah Kerja . . Rp. 51,305.90
1.200 m' Pipa galvanis Rp 90,666.67 Rp 108,800.00
1.000 ls Perlengkapan ( 35% harga pipa ) Rp 31,733.33 Rp 31,733.33
Jumlah Biaya bahan . . Rp. 140,533.33
. . Rp. 191,839.23
Overhead + Profit (10%) Rp. 19,183.92
Jumlah Total Rp. 211,023.16

1 m' Memasang pipa PVC tipe AW diameter 3/4"


0.036 h.o pekerja Rp 118,000.00 Rp 4,248.00
0.060 h.o tukang pipa Rp 138,000.00 Rp 8,280.00
0.006 h.o kepala tukang Rp 143,000.00 Rp 858.00
0.002 h.o mandor Rp 163,000.00 Rp 293.40
Jumlah Upah Kerja . . Rp. 13,679.40
1.200 m' Pipa PVC tipe AW f 3/4" Rp 7,075.00 Rp 8,490.00
1.000 ls Perlengkapan ( 35% harga pipa ) Rp 2,476.25 Rp 2,476.25
Jumlah Biaya bahan . . Rp. 10,966.25
. . Rp. 24,645.65
Overhead + Profit (10%) Rp. 2,464.57
Jumlah Total Rp. 27,110.22

1 m' Memasang pipa PVC tipe AW diameter 1"


0.036 h.o pekerja Rp 118,000.00 Rp 4,248.00
0.060 h.o tukang pipa Rp 138,000.00 Rp 8,280.00
0.006 h.o kepala tukang Rp 143,000.00 Rp 858.00
0.002 h.o mandor Rp 163,000.00 Rp 293.40
Jumlah Upah Kerja . . Rp. 13,679.40
1.200 m' Pipa PVC tipe AW f 1" Rp 9,650.00 Rp 11,580.00
1.000 ls Perlengkapan ( 35% harga pipa ) Rp 3,377.50 Rp 3,377.50
Jumlah Biaya bahan . . Rp. 14,957.50
. . Rp. 28,636.90
Overhead + Profit (10%) Rp. 2,863.69
Jumlah Total Rp. 31,500.59

1 m' Memasang pipa PVC tipe AW diameter 2"


0.036 h.o pekerja Rp 118,000.00 Rp 4,248.00
0.060 h.o tukang pipa Rp 138,000.00 Rp 8,280.00
0.006 h.o kepala tukang Rp 143,000.00 Rp 858.00
0.002 h.o mandor Rp 163,000.00 Rp 293.40
Jumlah Upah Kerja . . Rp. 13,679.40
1.200 m' Pipa PVC tipe AW f 2" Rp 22,250.00 Rp 26,700.00
1.000 ls Perlengkapan ( 35% harga pipa ) Rp 7,787.50 Rp 7,787.50
Jumlah Biaya bahan . . Rp. 34,487.50
. . Rp. 48,166.90
Overhead + Profit (10%) Rp. 4,816.69
Jumlah Total Rp. 52,983.59

1 m' Memasang pipa PVC tipe AW diameter 3"


0.036 h.o pekerja Rp 118,000.00 Rp 4,248.00
0.060 h.o tukang pipa Rp 138,000.00 Rp 8,280.00
0.006 h.o kepala tukang Rp 143,000.00 Rp 858.00
0.002 h.o mandor Rp 163,000.00 Rp 293.40
Jumlah Upah Kerja . . Rp. 13,679.40
1.200 m' Pipa PVC tipe AW f 3" Rp 44,375.00 Rp 53,250.00
1.000 ls Perlengkapan ( 35% harga pipa ) Rp 15,531.25 Rp 15,531.25
Jumlah Biaya bahan . . Rp. 68,781.25
. . Rp. 82,460.65
Overhead + Profit (10%) Rp. 8,246.07
Jumlah Total Rp. 90,706.72
1 m' Memasang pipa PVC tipe AW diameter 4"
0.081 h.o pekerja Rp 118,000.00 Rp 9,558.00
0.135 h.o tukang pipa Rp 138,000.00 Rp 18,630.00
0.014 h.o kepala tukang Rp 143,000.00 Rp 1,930.50
0.004 h.o mandor Rp 163,000.00 Rp 668.30
Jumlah Upah Kerja . . Rp. 30,786.80
1.200 m Pipa PVC tipe AW f 4" Rp 35,750.00 Rp 42,900.00
1.000 ls Perlengkapan ( 35% harga pipa ) Rp 12,512.50 Rp 12,512.50
Jumlah Biaya bahan . . Rp. 55,412.50
. . Rp. 86,199.30
Overhead + Profit (10%) Rp. 8,619.93
Jumlah Total Rp. 94,819.23

1 buah Memasang kran diameter 3/4" atau 1/2"


0.010 h.o pekerja Rp 118,000.00 Rp 1,180.00
0.100 h.o tukang pipa Rp 138,000.00 Rp 13,800.00
0.010 h.o kepala tukang Rp 143,000.00 Rp 1,430.00
0.005 h.o mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja . . Rp. 17,225.00
1.000 bh Kran air Rp 56,000.00 Rp 56,000.00
0.025 bh Seal tape Rp 14,000.00 Rp 350.00
Jumlah Biaya bahan . . Rp. 56,350.00
Jumlah Total . . Rp. 73,575.00
Overhead + Profit (10%) Rp. 7,357.50
Jumlah Total Rp. 80,932.50

1 unit Pemasangan panel PLP - LT1


3.5294 h.o Pekerja Rp 118,000.00 Rp 416,470.59
3.5294 h.o Teknisis Rp 138,000.00 Rp 487,058.82
7.0588 h.o Engginer gardu traksi Rp 143,000.00 Rp 1,009,411.76
3.5294 h.o Mandor Rp 163,000.00 Rp 575,294.12
Jumlah Upah Kerja ..... ............................. Rp 2,488,235.29
1.0000 bh Box Panel uk. 100x80x30 cm Rp 3,154,900.00 Rp 3,154,900.00
1.0000 bh Ammeter Rp 125,000.00 Rp 125,000.00
1.0000 bh Volt Meter Rp 110,000.00 Rp 110,000.00
1.0000 bh Volt Selektor Switch Rp 294,500.00 Rp 294,500.00
1.0000 bh Indikator lamp (RYG) Rp 65,000.00 Rp 65,000.00
1.0000 bh Diazed Fuse 2A Rp 14,500.00 Rp 14,500.00
1.0000 Pcs MCCB 3P 65A, 7.5 kA Rp 1,592,800.00 Rp 1,592,800.00
1.0000 Pcs MCB 1P 16A, 4.5 kA Rp 862,730.00 Rp 862,730.00
4.0000 Pcs MCB 1P 10A, 4.5 kA Rp 91,355.00 Rp 365,420.00
24.0000 Pcs MCB 1P 6A, 4.5 Ka Rp 91,355.00 Rp 2,192,520.00
5.0000 Pcs MCB 1P 4A, 4.5 Ka Rp 91,355.00 Rp 456,775.00
1.0000 Lot Material Assembley Rp 1,500,000.00 Rp 1,500,000.00
Jumlah Biaya Bahan ..... ............................. Rp 10,734,145.00
Jumlah Total ..... ............................. Rp 13,222,380.29
Overhead + Profit (10%) Rp. 1,322,238.03
Jumlah Total Rp. ###

1 unit Pemasangan panel PP.AC - LT1


3.5294 h.o Pekerja Rp 118,000.00 Rp 416,470.59
3.5294 h.o Teknisis Rp 138,000.00 Rp 487,058.82
7.0588 h.o Engginer gardu traksi Rp 143,000.00 Rp 1,009,411.76
3.5294 h.o Mandor Rp 163,000.00 Rp 575,294.12
Jumlah Upah Kerja ..... ............................. Rp 2,488,235.29
1.0000 bh Box Panel uk. 100x80x30 cm Rp 3,154,900.00 Rp 3,154,900.00
1.0000 bh Ammeter Rp 125,000.00 Rp 125,000.00
1.0000 bh Volt Meter Rp 110,000.00 Rp 110,000.00
1.0000 bh Volt Selektor Switch Rp 294,500.00 Rp 294,500.00
1.0000 bh Indikator lamp (RYG) Rp 65,000.00 Rp 65,000.00
1.0000 bh Diazed Fuse 2A Rp 14,500.00 Rp 14,500.00
1.0000 Pcs MCB 3P 45A, 7.5 kA Rp 749,500.00 Rp 749,500.00
16.0000 Pcs MCB 1P 6A, 4.5 Ka Rp 91,355.00 Rp 1,461,680.00
1.0000 Lot Material Assembley Rp 1,500,000.00 Rp 1,500,000.00
Jumlah Biaya Bahan ..... ............................. Rp 7,475,080.00
Jumlah Total ..... ............................. Rp 9,963,315.29
Overhead + Profit (10%) Rp. 996,331.53
Jumlah Total Rp. ###

1 unit Pemasangan panel PP - Transfer pump


3.5294 h.o Pekerja Rp 118,000.00 Rp 416,470.59
3.5294 h.o Teknisis Rp 138,000.00 Rp 487,058.82
7.0588 h.o Engginer gardu traksi Rp 143,000.00 Rp 1,009,411.76
3.5294 h.o Mandor Rp 163,000.00 Rp 575,294.12
Jumlah Upah Kerja ..... ............................. Rp 2,488,235.29
1.0000 bh Box Panel uk. 100x80x30 cm Rp 3,154,900.00 Rp 3,154,900.00
3.0000 bh Ammeter Rp 125,000.00 Rp 375,000.00
1.0000 bh Volt Meter Rp 110,000.00 Rp 110,000.00
1.0000 bh Volt Selektor Switch Rp 294,500.00 Rp 294,500.00
1.0000 bh Indikator lamp (RYG) Rp 65,000.00 Rp 65,000.00
1.0000 bh Diazed Fuse 2A Rp 14,500.00 Rp 14,500.00
1.0000 Pcs MCB 3P 40A, 25 kA Rp 1,142,240.00 Rp 1,142,240.00
4.0000 Pcs MCB 3P 25A, 16 kA Rp 888,140.00 Rp 3,552,560.00
1.0000 Pcs MCB 3P 16A, 16 kA Rp 862,730.00 Rp 862,730.00
1.0000 Lot Material Assembley Rp 1,500,000.00 Rp 1,500,000.00
Jumlah Biaya Bahan ..... ............................. Rp 11,071,430.00
Jumlah Total ..... ............................. Rp 13,559,665.29
Overhead + Profit (10%) Rp. 1,355,966.53
Jumlah Total Rp. ###

1 m' Kabel feeder NYY 4x16 mm2


0.0325 h.o Pekerja Rp 118,000.00 Rp 3,835.00
0.0325 h.o Tukang listrik Rp 138,000.00 Rp 4,485.00
0.0166 h.o Kepala tukang Rp 143,000.00 Rp 2,373.80
0.0140 h.o Mandor Rp 163,000.00 Rp 2,282.00
Jumlah Upah Kerja ..... ............................. 12,975.80
1.0000 m' NYY 4x16 mm2 Rp 37,000.00 Rp 37,000.00
1.0000 ls 10 % harga kabel Rp 3,700.00 Rp 3,700.00
Jumlah Biaya Bahan ..... ............................. Rp 40,700.00
Jumlah Total ..... ............................. Rp 53,675.80
Overhead + Profit (10%) Rp. 5,367.58
Jumlah Total Rp. 59,043.38

1 m' Kabel feeder NYY 4x10 mm2


0.0325 h.o Pekerja Rp 118,000.00 Rp 3,835.00
0.0325 h.o Tukang listrik Rp 138,000.00 Rp 4,485.00
0.0166 h.o Kepala tukang Rp 143,000.00 Rp 2,373.80
0.0140 h.o Mandor Rp 163,000.00 Rp 2,282.00
Jumlah Upah Kerja ..... ............................. 12,975.80
1.0000 m' NYY 4x10 mm2 Rp 69,000.00 Rp 69,000.00
1.0000 ls 10 % harga kabel Rp 6,900.00 Rp 6,900.00
Jumlah Biaya Bahan ..... ............................. Rp 75,900.00
Jumlah Total ..... ............................. Rp 88,875.80
Overhead + Profit (10%) Rp. 8,887.58
Jumlah Total Rp. 97,763.38

1 m' Kabel feeder NYFGbY 4x10 mm2


0.0800 h.o Pekerja Rp 118,000.00 Rp 9,440.00
0.0800 h.o Tukang listrik Rp 138,000.00 Rp 11,040.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.0250 h.o Mandor Rp 163,000.00 Rp 4,075.00
Jumlah Upah Kerja ..... ............................. 28,130.00
1.0000 m' NYFGbY 4x10 mm2 Rp 94,000.00 Rp 94,000.00
1.0000 ls 10 % harga kabel Rp 9,400.00 Rp 9,400.00
Jumlah Biaya Bahan ..... ............................. Rp 103,400.00
Jumlah Total ..... ............................. Rp 131,530.00
Overhead + Profit (10%) Rp. 13,153.00
Jumlah Total Rp. 144,683.00

1 m' Kabel Ladder tray 600x100x2400x1.2 mm


0.2000 h.o Pekerja Rp 118,000.00 Rp 23,600.00
0.2500 h.o Tukang listrik Rp 138,000.00 Rp 34,500.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.0050 h.o Mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja ..... ............................. 66,065.00
1.0000 m' Kabel Ladder tray 600x100x2400x1.2 m Rp 323,000.00 Rp 323,000.00
1.0000 ls 5% harga marerial Rp 32,300.00 Rp 32,300.00
Jumlah Biaya Bahan ..... ............................. Rp 355,300.00
Jumlah Total ..... ............................. Rp 421,365.00
Overhead + Profit (10%) Rp. 42,136.50
Jumlah Total Rp. 463,501.50

1 m' Kabel Tray 600x100x2400x1.2 mm


0.2000 h.o Pekerja Rp 118,000.00 Rp 23,600.00
0.2500 h.o Tukang listrik Rp 138,000.00 Rp 34,500.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.0050 h.o Mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja ..... ............................. 66,065.00
1.0000 m' Kabel Tray 600x100x2400x1.2 mm Rp 287,000.00 Rp 287,000.00
1.0000 ls 5 % harga material Rp 28,700.00 Rp 28,700.00
Jumlah Biaya Bahan ..... ............................. Rp 315,700.00
Jumlah Total ..... ............................. Rp 381,765.00
Overhead + Profit (10%) Rp. 38,176.50
Jumlah Total Rp. 419,941.50

1 m' Kabel Tray300x100x2400x1.2 mm


0.2000 h.o Pekerja Rp 118,000.00 Rp 23,600.00
0.2500 h.o Tukang listrik Rp 138,000.00 Rp 34,500.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.0050 h.o Mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja ..... ............................. 66,065.00
1.0000 m' Kabel Tray 300x100x2400x1.2 mm Rp 154,000.00 Rp 154,000.00
1.0000 ls 5 % harga material Rp 15,400.00 Rp 15,400.00
Jumlah Biaya Bahan ..... ............................. Rp 169,400.00
Jumlah Total ..... ............................. Rp 235,465.00
Overhead + Profit (10%) Rp. 23,546.50
Jumlah Total Rp. 259,011.50

1 bh Elbow Kabel Tray 600x100x1.2 mm


0.1000 h.o Pekerja Rp 118,000.00 Rp 11,800.00
0.1250 h.o Tukang listrik Rp 138,000.00 Rp 17,250.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.0025 h.o Mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja ..... ............................. 33,032.50
1.0000 bh Elbow Kabel Tray 600x100x1.2 mm Rp 353,000.00 Rp 353,000.00
1.0000 ls 5 % harga material Rp 35,300.00 Rp 35,300.00
Jumlah Biaya Bahan ..... ............................. Rp 388,300.00
Jumlah Total ..... ............................. Rp 421,332.50
Overhead + Profit (10%) Rp. 42,133.25
Jumlah Total Rp. 463,465.75

1 bh Tee Kabel Tray 600x300x100x1.2 mm


0.1000 h.o Pekerja Rp 118,000.00 Rp 11,800.00
0.1250 h.o Tukang listrik Rp 138,000.00 Rp 17,250.00
0.0250 h.o Kepala tukang Rp 143,000.00 Rp 3,575.00
0.0025 h.o Mandor Rp 163,000.00 Rp 407.50
Jumlah Upah Kerja ..... ............................. 33,032.50
1.0000 bh Tee Kabel Tray 600x300x100x1.2 mm Rp 312,000.00 Rp 312,000.00
1.0000 ls 5 % harga marerial Rp 31,200.00 Rp 31,200.00
Jumlah Biaya Bahan ..... ............................. Rp 343,200.00
Jumlah Total ..... ............................. Rp 376,232.50
Overhead + Profit (10%) Rp. 37,623.25
Jumlah Total Rp. 413,855.75

1 bh Down Light LED 9 watt


0.0250 h.o Pekerja Rp 118,000.00 Rp 2,950.00
0.0250 h.o Tukang listrik Rp 138,000.00 Rp 3,450.00
0.0166 h.o Kepala tukang Rp 143,000.00 Rp 2,373.80
0.0140 h.o Mandor Rp 163,000.00 Rp 2,282.00
Jumlah Upah Kerja ..... ............................. 11,055.80
1.0000 bh Down Light LED 9 watt Rp 92,000.00 Rp 92,000.00
1.0000 bh Pelubangan Plafon Rp 9,200.00 Rp 9,200.00
Jumlah Biaya Bahan ..... ............................. Rp 101,200.00
Jumlah Total ..... ............................. Rp 112,255.80
Overhead + Profit (10%) Rp. 11,225.58
Jumlah Total Rp. 123,481.38

1 bh TL 2x36 watt
0.0250 h.o Pekerja Rp 118,000.00 Rp 2,950.00
0.0250 h.o Tukang listrik Rp 138,000.00 Rp 3,450.00
0.0166 h.o Kepala tukang Rp 143,000.00 Rp 2,373.80
0.0140 h.o Mandor Rp 163,000.00 Rp 2,282.00
Jumlah Upah Kerja ..... ............................. 11,055.80
1.0000 bh TL 2x36 watt Rp 40,000.00 Rp 40,000.00
1.0000 bh Pelubangan Plafon Rp 4,000.00 Rp 4,000.00
Jumlah Biaya Bahan ..... ............................. Rp 44,000.00
Jumlah Total ..... ............................. Rp 55,055.80
Overhead + Profit (10%) Rp. 5,505.58
Jumlah Total Rp. 60,561.38

1 bh Lampu Lampu sorot LED 70 Watt


0.0250 h.o Pekerja Rp 118,000.00 Rp 2,950.00
0.0250 h.o Tukang listrik Rp 138,000.00 Rp 3,450.00
0.0166 h.o Kepala tukang Rp 143,000.00 Rp 2,373.80
0.0140 h.o Mandor Rp 163,000.00 Rp 2,282.00
Jumlah Upah Kerja ..... ............................. 11,055.80
1.0000 bh Lampu sorot LED 70 Watt Rp 975,000.00 Rp 975,000.00
1.0000 bh Pelubangan Plafon Rp 97,500.00 Rp 97,500.00
Jumlah Biaya Bahan ..... ............................. Rp 1,072,500.00
Jumlah Total ..... ............................. Rp 1,083,555.80
Overhead + Profit (10%) Rp. 108,355.58
Jumlah Total Rp. 1,191,911.38

1 bh Saklar Tunggal
0.0250 h.o Pekerja Rp 118,000.00 Rp 2,950.00
0.0250 h.o Tukang listrik Rp 138,000.00 Rp 3,450.00
0.0166 h.o Kepala tukang Rp 143,000.00 Rp 2,373.80
0.0140 h.o Mandor Rp 163,000.00 Rp 2,282.00
Jumlah Upah Kerja ..... ............................. 11,055.80
1.0000 bh Saklar Tunggal Rp 8,500.00 Rp 8,500.00
Jumlah Biaya Bahan ..... ............................. Rp 8,500.00
Jumlah Total ..... ............................. Rp 19,555.80
Overhead + Profit (10%) Rp. 1,955.58
Jumlah Total Rp. 21,511.38

1 bh Saklar Ganda
0.0250 h.o Pekerja Rp 118,000.00 Rp 2,950.00
0.0250 h.o Tukang listrik Rp 138,000.00 Rp 3,450.00
0.0166 h.o Kepala tukang Rp 143,000.00 Rp 2,373.80
0.0140 h.o Mandor Rp 163,000.00 Rp 2,282.00
Jumlah Upah Kerja ..... ............................. 11,055.80
1.0000 bh Saklar Ganda Rp 12,500.00 Rp 12,500.00
Jumlah Biaya Bahan ..... ............................. Rp 12,500.00
Jumlah Total ..... ............................. Rp 23,555.80
Overhead + Profit (10%) Rp. 2,355.58
Jumlah Total Rp. 25,911.38

1 bh Stop kontak, inbow


0.0250 h.o Pekerja Rp 118,000.00 Rp 2,950.00
0.0250 h.o Tukang listrik Rp 138,000.00 Rp 3,450.00
0.0166 h.o Kepala tukang Rp 143,000.00 Rp 2,373.80
0.0140 h.o Mandor Rp 163,000.00 Rp 2,282.00
Jumlah Upah Kerja ..... ............................. 11,055.80
1.0000 bh Stop kontak, inbow Rp 33,000.00 Rp 33,000.00
Jumlah Biaya Bahan ..... ............................. Rp 33,000.00
Jumlah Total ..... ............................. Rp 44,055.80
Overhead + Profit (10%) Rp. 4,405.58
Jumlah Total Rp. 48,461.38

1 bh Stop kontak, outbow


0.0250 h.o Pekerja Rp 118,000.00 Rp 2,950.00
0.0250 h.o Tukang listrik Rp 138,000.00 Rp 3,450.00
0.0166 h.o Kepala tukang Rp 143,000.00 Rp 2,373.80
0.0140 h.o Mandor Rp 163,000.00 Rp 2,282.00
Jumlah Upah Kerja ..... ............................. 11,055.80
1.0000 bh Stop kontak, outbow Rp 37,000.00 Rp 37,000.00
Jumlah Biaya Bahan ..... ............................. Rp 37,000.00
Jumlah Total ..... ............................. Rp 48,055.80
Overhead + Profit (10%) Rp. 4,805.58
Jumlah Total Rp. 52,861.38

1 bh Stop Kontak AC
0.0250 h.o Pekerja Rp 118,000.00 Rp 2,950.00
0.0250 h.o Tukang listrik Rp 138,000.00 Rp 3,450.00
0.0166 h.o Kepala tukang Rp 143,000.00 Rp 2,373.80
0.0140 h.o Mandor Rp 163,000.00 Rp 2,282.00
Jumlah Upah Kerja ..... ............................. 11,055.80
1.0000 bh Stop Kontak AC Rp 127,000.00 Rp 127,000.00
Jumlah Biaya Bahan ..... ............................. Rp 127,000.00
Jumlah Total ..... ............................. Rp 138,055.80
Overhead + Profit (10%) Rp. 13,805.58
Jumlah Total Rp. 151,861.38

1 ttk Instalasi Penerangan


(Dari Panel Ke Saklar Lalu Menuju Titik Lampu)
0.1500 h.o Pekerja Rp 118,000.00 Rp 17,700.00
0.1500 h.o Tukang listrik Rp 138,000.00 Rp 20,700.00
0.1800 h.o Kepala tukang Rp 143,000.00 Rp 25,740.00
0.1500 h.o Mandor Rp 163,000.00 Rp 24,450.00
Jumlah Upah Kerja ..... 88,590.00
15.0000 m' Kabel NYM 3 x 2,5 mm Rp 21,100.00 Rp 316,500.00
5.0000 m' Kabel NYM 3 x 1,5 mm Rp 12,100.00 Rp 60,500.00
4.0000 bh L.Bow Sekrup Rp 600.00 Rp 2,400.00
10.0000 bh Sadel Rp 200.00 Rp 2,000.00
5.0000 bh Penggantung Rp 4,000.00 Rp 20,000.00
1.0000 bh Inbow Dos Rp 3,500.00 Rp 3,500.00
2.0000 bh T-Dos Rp 8,000.00 Rp 16,000.00
10.0000 bh Fizzer + Sekrup Rp 1,152.00 Rp 11,520.00
5.0000 bh Kabel Teets Rp 216.00 Rp 1,080.00
2.0000 m' Pipa Spiral Rp 21,600.00 Rp 43,200.00
5.0000 bh L-Bow Rp 2,880.00 Rp 14,400.00
2.0000 btg Pipa Clipsal Rp 14,400.00 Rp 28,800.00
0.2000 bh Isolasi Rp 7,200.00 Rp 1,440.00
Jumlah Biaya Bahan ..... ............................. Rp 521,340.00
Jumlah Total ..... ............................. Rp 550,140.00
Overhead + Profit (10%) Rp. 55,014.00
Jumlah Total Rp. 605,154.00

1 ttk Pasang stop kontak


(Dari Panel Ke Saklar Lalu Menuju Titik Lampu/AC)
0.1500 h.o Pekerja Rp 118,000.00 Rp 17,700.00
0.1500 h.o Tukang listrik Rp 138,000.00 Rp 20,700.00
0.1800 h.o Kepala tukang Rp 143,000.00 Rp 25,740.00
0.1500 h.o Mandor Rp 163,000.00 Rp 24,450.00
Jumlah Upah Kerja ..... 88,590.00
10.0000 m' Kabel NYM 3 x 2,5 mm Rp 21,100.00 Rp 211,000.00
4.0000 bh L.Bow Sekrup Rp 600.00 Rp 2,400.00
10.0000 bh Sadel Rp 200.00 Rp 2,000.00
5.0000 bh Penggantung Rp 4,000.00 Rp 20,000.00
1.0000 bh Inbow Dos Rp 3,500.00 Rp 3,500.00
2.0000 bh T-Dos Rp 8,000.00 Rp 16,000.00
10.0000 bh Fizzer + Sekrup Rp 1,152.00 Rp 11,520.00
5.0000 bh Kabel Teets Rp 216.00 Rp 1,080.00
2.0000 m' Pipa Spiral Rp 21,600.00 Rp 43,200.00
5.0000 bh L-Bow Rp 2,880.00 Rp 14,400.00
3.0000 btg Pipa Clipsal Rp 14,400.00 Rp 43,200.00
0.2000 bh Isolasi Rp 7,200.00 Rp 1,440.00
Jumlah Biaya Bahan ..... ............................. Rp 369,740.00
Jumlah Total ..... ............................. Rp 371,180.00
Overhead + Profit (10%) Rp. 37,118.00
Jumlah Total Rp. 408,298.00

1 ttk Pasang instalasi exhause


(Dari Panel Ke Saklar Lalu Menuju exhause
0.8000 h.o Pekerja Rp 118,000.00 Rp 94,400.00
0.5000 h.o Tukang listrik Rp 138,000.00 Rp 69,000.00
0.0800 h.o Mandor Rp 163,000.00 Rp 13,040.00
Jumlah Upah Kerja ..... 176,440.00
12.0000 m' Kabel NYM 3 x 2,5 mm Rp 21,100.00 Rp 253,200.00
4.0000 bh L.Bow Sekrup Rp 600.00 Rp 2,400.00
10.0000 bh Sadel Rp 200.00 Rp 2,000.00
5.0000 bh Penggantung Rp 4,000.00 Rp 20,000.00
1.0000 bh Inbow Dos Rp 3,500.00 Rp 3,500.00
2.0000 bh T-Dos Rp 8,000.00 Rp 16,000.00
10.0000 bh Fizzer + Sekrup Rp 1,152.00 Rp 11,520.00
5.0000 bh Kabel Teets Rp 216.00 Rp 1,080.00
2.0000 Mtr Pipa Spiral Rp 21,600.00 Rp 43,200.00
3.0000 btg Pipa Clipsal Rp 14,400.00 Rp 43,200.00
0.2000 bh Isolasi Rp 7,200.00 Rp 1,440.00
Jumlah Biaya Bahan ..... ............................. Rp 397,540.00
Jumlah Total ..... ............................. Rp 573,980.00
Overhead + Profit (10%) Rp. 57,398.00
Jumlah Total Rp. 631,378.00

1 unit Digital Video Recorder


0.2000 h.o Pekerja Rp 118,000.00 Rp 23,600.00
0.3000 h.o Tukang listrik Rp 138,000.00 Rp 41,400.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.0180 h.o Mandor Rp 163,000.00 Rp 2,934.00
Jumlah Upah Kerja ..... ............................. 75,084.00
1.0000 bh DVR Rp 19,800,000.00 Rp 19,800,000.00
1.0000 ls 5% harga marerial Rp 1,980,000.00 Rp 1,980,000.00
Jumlah Biaya Bahan ..... ............................. Rp 21,780,000.00
Jumlah Total ..... ............................. Rp 21,855,084.00
Overhead + Profit (10%) Rp. 2,185,508.40
Jumlah Total Rp. ###

1 unit DB CCTV
0.2000 h.o Pekerja Rp 118,000.00 Rp 23,600.00
0.3000 h.o Tukang listrik Rp 138,000.00 Rp 41,400.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.0180 h.o Mandor Rp 163,000.00 Rp 2,934.00
Jumlah Upah Kerja ..... ............................. 75,084.00
1.0000 bh DB CCTV Rp 1,740,000.00 Rp 1,740,000.00
1.0000 ls 2% harga marerial Rp 174,000.00 Rp 174,000.00
Jumlah Biaya Bahan ..... ............................. Rp 1,914,000.00
Jumlah Total ..... ............................. Rp 1,989,084.00
Overhead + Profit (10%) Rp. 198,908.40
Jumlah Total Rp. 2,187,992.40

1 unit Rack Metal 32"


0.2000 h.o Pekerja Rp 118,000.00 Rp 23,600.00
0.3000 h.o Tukang listrik Rp 138,000.00 Rp 41,400.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.0180 h.o Mandor Rp 163,000.00 Rp 2,934.00
Jumlah Upah Kerja .................................... 75,084.00
1.0000 bh Rack Metal 32" Rp 7,500,000.00 Rp 7,500,000.00
1.0000 ls 2% harga marerial Rp 750,000.00 Rp 750,000.00
Jumlah Biaya Bahan ..... ............................. Rp 8,250,000.00
Jumlah Total ..... ............................. Rp 8,325,084.00
Overhead + Profit (10%) Rp. 832,508.40
Jumlah Total Rp. 9,157,592.40

1 unit LCD monitor 32"


0.2000 h.o Pekerja Rp 118,000.00 Rp 23,600.00
0.3000 h.o Tukang listrik Rp 138,000.00 Rp 41,400.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.0180 h.o Mandor Rp 163,000.00 Rp 2,934.00
Jumlah Upah Kerja .................................... 75,084.00
1.0000 bh LCD monitor 32" Rp 6,550,000.00 Rp 6,550,000.00
1.0000 ls 2% harga marerial Rp 655,000.00 Rp 655,000.00
Jumlah Biaya Bahan ..... ............................. Rp 7,205,000.00
Jumlah Total ..... ............................. Rp 7,280,084.00
Overhead + Profit (10%) Rp. 728,008.40
Jumlah Total Rp. 8,008,092.40

1 unit kamera CCTV


0.2000 h.o Pekerja Rp 118,000.00 Rp 23,600.00
0.3000 h.o Tukang listrik Rp 138,000.00 Rp 41,400.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.0180 h.o Mandor Rp 163,000.00 Rp 2,934.00
Jumlah Upah Kerja .................................... 75,084.00
1.0000 unit Camera dome type Rp 4,276,000.00 Rp 4,276,000.00
1.0000 unit Camera bullet type Rp 3,098,000.00 Rp 3,098,000.00
1.0000 ls Pelengkapan(10%) Rp 309,800.00 Rp 309,800.00
Jumlah Biaya Bahan ..... ............................. Rp 4,585,800.00
Jumlah Biaya Bahan ..... ............................. Rp 3,407,800.00
Jumlah Total ..... ............................. Rp 4,660,884.00
Jumlah Total ..... ............................. Rp 3,482,884.00

1 ttk Instalasi CCTV


(Dari Terminal Box TV ke Boster Kemudian Ke Titik Outlet TV)
1.6000 h.o Pekerja Rp 118,000.00 Rp 188,800.00
1.2000 h.o Tukang listrik Rp 138,000.00 Rp 165,600.00
0.1600 h.o Mandor Rp 163,000.00 Rp 26,080.00
Jumlah Upah Kerja ..... 380,480.00
30.0000 m' NYM 2 x 2.5 mm Rp 21,100.00 Rp 633,000.00
30.0000 m' Kabel RG 6 Rp 5,640.00 Rp 169,200.00
1.0000 bh L.Bow Sekrup Rp 600.00 Rp 600.00
100.0000 bh Sadel Rp 200.00 Rp 20,000.00
50.0000 bh Penggantung Rp 4,000.00 Rp 200,000.00
1.0000 bh Inbow Dos Rp 3,500.00 Rp 3,500.00
2.0000 bh T-Dos Rp 8,000.00 Rp 16,000.00
100.0000 bh Fizzer + Sekrup Rp 1,152.00 Rp 115,200.00
50.0000 bh Kabel Teets Rp 216.00 Rp 10,800.00
2.0000 m' Pipa Spiral Rp 21,600.00 Rp 43,200.00
5.0000 bh L-Bow Rp 2,880.00 Rp 14,400.00
20.8333 btg Pipa Clipsal Rp 14,400.00 Rp 300,000.00
0.2000 bh Isolasi Rp 7,200.00 Rp 1,440.00
Jumlah Biaya Bahan ..... ............................. Rp 1,527,340.00
Jumlah Total ..... ............................. Rp 1,907,820.00
Overhead + Profit (10%) Rp. 190,782.00
Jumlah Total Rp. 2,098,602.00

1 unit Exhaust fan type ceiling fan 30x30 cm


1.2800 h.o Pekerja Rp 118,000.00 Rp 151,040.00
0.2800 h.o Tukang listrik Rp 138,000.00 Rp 38,640.00
0.0280 h.o Kepala tukang Rp 143,000.00 Rp 4,004.00
0.0028 h.o Mandor Rp 163,000.00 Rp 456.40
Jumlah Upah Kerja .................................... 194,140.40
1.0000 unit Exhaust fan type ceiling fan Rp 325,000.00 Rp 325,000.00
1.0000 ls Material instalasi (35%) Rp 32,500.00 Rp 32,500.00
Jumlah Biaya Bahan ..... ............................. Rp 357,500.00
Jumlah Total ..... ............................. Rp 551,640.40
Overhead + Profit (10%) Rp. 55,164.04
Jumlah Total Rp. 606,804.44

1 unit Exhaust fan type ceiling wall 30x30 cm


1.2800 h.o Pekerja Rp 118,000.00 Rp 151,040.00
0.2800 h.o Tukang listrik Rp 138,000.00 Rp 38,640.00
0.0280 h.o Kepala tukang Rp 143,000.00 Rp 4,004.00
0.0028 h.o Mandor Rp 163,000.00 Rp 456.40
Jumlah Upah Kerja .................................... 194,140.40
1.0000 unit Exhaust fan type ceiling wall Rp 385,000.00 Rp 385,000.00
1.0000 ls Material instalasi (35%) Rp 38,500.00 Rp 38,500.00
Jumlah Biaya Bahan ..... ............................. Rp 423,500.00
Jumlah Total ..... ............................. Rp 617,640.40
Overhead + Profit (10%) Rp. 61,764.04
Jumlah Total Rp. 679,404.44

1 unit AC type split wall mounted kapasitas 1.200 Btuh


1.5000 h.o Pekerja Rp 118,000.00 Rp 177,000.00
0.5000 h.o Tukang listrik Rp 138,000.00 Rp 69,000.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.0050 h.o Mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja .................................... 253,965.00
1.0000 bh AC type split wall mounted kapasitas 120 Rp 8,840,000.00 Rp 8,840,000.00
1.0000 ls Material instalasi (10%) Rp 884,000.00 Rp 884,000.00
Jumlah Biaya Bahan ..... ............................. Rp 9,724,000.00
Jumlah Total ..... ............................. Rp 9,977,965.00
Overhead + Profit (10%) Rp. 997,796.50
Jumlah Total Rp. ###

1 unit AC type split wall mounted kapasitas 9000 Btuh


1.5000 h.o Pekerja Rp 118,000.00 Rp 177,000.00
0.5000 h.o Tukang listrik Rp 138,000.00 Rp 69,000.00
0.0500 h.o Kepala tukang Rp 143,000.00 Rp 7,150.00
0.0050 h.o Mandor Rp 163,000.00 Rp 815.00
Jumlah Upah Kerja .................................... 253,965.00
1.0000 bh AC type split wall mounted kapasitas 120 Rp 5,500,000.00 Rp 5,500,000.00
1.0000 ls Material instalasi (10%) Rp 550,000.00 Rp 550,000.00
Jumlah Biaya Bahan ..... ............................. Rp 6,050,000.00
Jumlah Total ..... ............................. Rp 6,303,965.00
Overhead + Profit (10%) Rp. 630,396.50
Jumlah Total Rp. 6,934,361.50

1 unit Pemadam Api Ringan (PAR) 3 kg, Co2


0.2000 h.o Pekerja Rp 118,000.00 Rp 23,600.00
0.2000 h.o Tukang Pipa Rp 138,000.00 Rp 27,600.00
0.0002 h.o Mandor Rp 163,000.00 Rp 32.60
Jumlah Upah Kerja .................................... 51,232.60
1.0000 m' Api Ringan (PAR) 3 kg, Co2 Rp 550,000.00 Rp 550,000.00
1.0000 ls Peralatan (10%) Rp 55,000.00 Rp 55,000.00
Jumlah Biaya Bahan ..... ............................. Rp 605,000.00
Jumlah Total ..... ............................. Rp 656,232.60
Overhead + Profit (10%) Rp. 65,623.26
Jumlah Total Rp. 721,855.86

1 bh bak fibreglass volume 2 m³ air


3.0000 h.o Pekerja Rp 118,000.00 Rp 354,000.00
4.5000 h.o Tukang pipa Rp 138,000.00 Rp 621,000.00
0.9000 h.o Kepala tukang Rp 143,000.00 Rp 128,700.00
0.9000 h.o Mandor Rp 163,000.00 Rp 146,700.00
Jumlah Upah Kerja .................................... 1,250,400.00
1.0000 bh Bak fibreglass Rp 2,800,000.00 Rp 2,800,000.00
1.0000 ls Perlengkapan (12% harga bak) Rp 280,000.00 Rp 280,000.00
Jumlah Biaya Bahan ..... ............................. Rp 3,080,000.00
Jumlah Total ..... ............................. Rp 4,330,400.00
Overhead + Profit (10%) Rp. 433,040.00
Jumlah Total Rp. 4,763,440.00
2,479,938.12
HARGA SATUAN
NO NAMA BARANG SPESIFIKASI SATUAN
DATARAN RENDAH

A UPAH KERJA
1 Kepala Tukang Hari 143,000.00
2 Mandor Hari 163,000.00
3 Mekanik Terampil Hari 143,000.00
4 Mekanik Semi Terampil Hari 123,000.00
5 Operator Terampil Hari 183,000.00
6 Operator Semi Terampil Hari 153,000.00
7 Pembantu Operator Hari 148,000.00
8 Sopir Terampil Hari 143,000.00
9 Sopir Pribadi Hari 143,000.00
10 Pembantu Sopir Hari 120,500.00
11 Pekerja kasar/Buruh Hari 118,000.00
12 Pekerja Semi Terampil Hari 120,500.00
13 Pekerja Terampil/Pembantu Instalatur Hari 123,000.00
14 Tukang Batu Hari 138,000.00
15 Tukang Kayu Hari 138,000.00
16 Tukang Besi Hari 138,000.00
17 Tukang Cat Hari 138,000.00
18 Tukang Paving Hari 138,000.00
19 Tukang Pipa Hari 138,000.00
20 Tukang Las Hari 138,000.00
21 Tukang Aluminium Hari 138,000.00
22 Tukang Foto Hari 138,000.00
22 Instalasi Listrik Hari 153,000.00
B HARGA BAHAN
1 Acuan dari Kayu M³ 3,050,000.00
2 Agregat Halus/Pasir Bersih M³ 148,500.00
3 Alat-alat Kerja (3 set) Setiap set 250,000.00
4 Atap Metal Sakura Roof Lbr 41,000.00
5 Atap Multi Roof Lbr 90,000.00
6 Atap Surya Roof Lbr 55,000.00
7 Atap Policarbonaat M² 58,200.00
8 Atap Spandek t = 0.2 L=75 cm M' 40,000.00
9 Atap Spandek t = 0.3 L=75 cm M' 45,000.00
10 Atap Spandek t = 0.35 L=75 cm M' 55,000.00
11 Genteng Beton Buah 11,500.00
12 Genteng Keramik KIA Buah 17,500.00
13 Genteng Keramik Glasur Buah 19,000.00
14 Genteng Metal Berpasir/m 2x4 daun tebal 0.25 jarak reng 38 Buah 56,300.00
15 Bubungan Seng Buah 38,000.00
16 Bubungan Metal Sakura Roof Buah 24,000.00
17 Bubungan Multi Roof Buah 55,000.00
18 Bubungan Nok Genteng Beton Buah 27,500.00
19 Bubungan Surya Roof Buah 52,300.00
Bubungan Spandek Buah 63,250.00
20 Nok Genteng Surya, panjang 40 cm Buah 37,600.00
21 Nok Genteng Keramik Buah 18,000.00
22 Nok Genteng Keramik Glazur Buah 19,000.00
23 Nok "C" Colour/pcs Tebal 0.25 panjang 75 cm Buah 25,300.00
24 Nok Floor/tile grout (bahan pengisi Nat-flexible water proofing) kg 19,000.00
25 ACP t = 3 mm (1.22x2.44 m2) lbr 433,800.00
26 ACP t = 4 mm (1.22x2.44 m2) lbr 612,000.00
Aluminium Porporated m² 413,380.00
27 Kusen Aluminium 3" m' 75,000.00
28 Kusen Aluminium 4" m' 90,000.00
29 Rangka Jendela Kusen Aluminium 3" m' 125,000.00
30 Rangka Pintu Kusen Aluminium 4" m' 250,000.00
31 Kosen + Pintu Aluminium 4" unit 1,600,000.00
32 Kusen + Pintu PVC Toilet unit 250,000.00
33 Aluminium Foil Single / rool 50m roll 465,000.00
34 Baja Profil IWF / CNP Kg 13,500.00
IWF 400x200x8x13 mm btg 12,560,000.00
IWF 200x100x5.5x8 mm btg 2,604,000.00
CNP 150x50x20x2.3 mm btg 357,500.00
35 Baja gulungan ukuran Ringan Kg 25,000.00
36 Baja baut-baut Kg 36,800.00
37 Baja Galvanisir Kg 46,800.00
38 Baja Struktur Kg 20,570.00
39 Baja paku-paku jembatan Kg 23,800.00
40 Bata Bata Merah Buah 600.00
41 Bata Ringan (9x19x39) cm (150 bh) m³ 900,000.00
42 Bata Ringan (10x20x60) cm (83 bh) m³ 850,000.00
43 Bata Ringan (7.5x20x60) cm (111 bh) m³ 900,000.00
44 Batu Tela Uk 20x30x10 Buah 3,500.00
45 Batu Batko 9x19x39 Buah 4,950.00
46 Batu Gunung m³ 147,200.00
47 Batu Kali Besar/Batu Belah Pondasi m³ 146,900.00
48 Batu Kali Kecil m³ 143,700.00
49 Batu Kerikil Koral m³ 250,000.00
50 Batu Kapur Bongkaran m³ 111,700.00
51 Abu Batu (Batu Pecah /split 0.5-1 cm) m³ 294,300.00
52 Batu Pecah/Split 1-2 cm (chipping) m³ 260,000.00
53 Batu Pecah/Split 2-3 cm m³ 245,000.00
54 Batu Pecah 3-5 cm m³ 243,000.00
55 Batu Pecah 5-7 cm m³ 211,000.00
56 Batu Pecah 7-10 cm m³ 172,000.00
57 Batu Pecah 10-15 cm m³ 160,000.00
58 Kerikil Berpasir Alami (Sirtu Royalti) m³ 105,000.00
59 Kerikil Sirtu m³ 115,600.00
60 Kerik Sungai royalti (tidak disaring) m³ 104,000.00
61 Kerikil Sungai Tersaring m³ 125,000.00
62 Bak Air Fiber Glass uk 55x55x60 cm Buah 216,000.00
63 Bak Cuci Stainless stell 1 mata Buah 450,000.00
64 Bondek/Floordeck (110cmx700cm) t=0.75 mm m 102,000.00
65 Buis Beton 1/2 Dia 20cm Buah 48,000.00
66 Besi U24 Polos Kg 12,000.00
67 Besi U39 Ulir Kg 14,800.00
68 Besi dia 6 - 12 m Btg 29,000.00
69 Besi dia 8 - 12 m Btg 46,000.00
70 Besi dia 10 - 12 m Btg 68,300.00
71 Besi dia 12 - 12 m Btg 100,000.00
72 Besi Ulir dia 13 - 12 m Btg 115,000.00
73 Besi Ulir dia 16 - 12 m Btg 125,000.00
74 Besi Ulir dia 19 - 12 m Btg 240,000.00
75 Besi PLAT 4'x8' (0.2x122x244 /46,7 kg) Kg 12,000.00
76 Besi Tempe m² 350,000.00
77 Bessi Hollow 40.40.1.8 mm P=6 m bt 135,000.00
78 Bessi Hollow 20.40.1.8 mm P=6 m bt 95,000.00
79 Bessi Hollow 20x20 - 6 m bt 75,000.00
Besi strip bt 45,000.00
Besi strip 2 x 3 m' 22,000.00
80 Hollow Aluminium metal furing rangka plafond 40x40x0.3 mm P=4 m bt 28,000.00
81 Hollow Aluminium metal furing rangka plafond 20x40x0.3 mm P=4 m bt 25,000.00
82 Pasangan Rangka Plafond Metal Furing 0.4x45x19x40 m² 104,500.00
83 Kalsifuring CR 50x25x4000 (4m) bt 42,400.00
84 Kalsifuring MR 38X13X4000 (4m) bt 38,000.00
85 Kalsicrew 6x20 (1500/dos) Dos 132,000.00
86 Kalsicrew 8 - 10 (1000/dos) Dos 117,000.00
87 Kalsinail 3 - 4.5 (kait pada kayu) 2000/dos Dos 69,500.00
88 Kawat Penggantung Hollow Aluminium Buah 2,000.00
Kalsiboard Lembar 135,000.00
89 Besi Siku L 40.40.4 (6m) Btg 95,000.00
90 Besi Streep (30x3 mm) Btg 45,000.00
91 Baja Ringan Canal C75.80 sni pj= 6 m Btg 90,000.00
92 Baja Ringan Canal C75.75 sni pj= 6 m Btg 80,000.00
93 Reng Tinggi = 28 mm T.0.45 pj= 6m Btg 35,000.00
94 Reng Tinggi = 32 mm T.0.45 pj= 6m Btg 47,000.00
95 Screw Reng (1 pack = 1000 pcs) pack 200,000.00
96 Baut Spandek (1 pack = 500 bh pack 250,000.00
97 Pasangan Rangka Atap Baja Ringan m² 186,100.00
98 Dynabolt/pcs 10x80 Buah 2,500.00
99 Roster Beton Buah 20,000.00
100 Roster Keramik 30x30 Buah 65,000.00
101 Roster Kaca /glasblock 19x38x8 cm Buah 19,800.00
102 Bondex (Floor deck) t=0.75 m² 110,000.00
103 Bitumen (Asphalt AC 60/70) Kg 13,200.00
104 Asphalt Curah Ton 13,500,000.00
105 Cat Kayu/besi (dulux) Kg 85,000.00
106 Cat Kayu/besi (AVIAN) Kg 56,000.00
107 Cat Tembok KW II/EX VINILEX (25kg) Kg 23,200.00
108 Cat Tembok KW I /Ex DULUX (5kg) Kg 34,000.00
109 Closet Duduk "CW 600 J/SW 660 J Komplit dan ACC Unit 2,250,000.00
110 Closet Duduk Ex KIA Lengkap (putih) Tangki Buah 1,540,000.00
111 Closet Jongkok 'type CE 6 ex Toto Unit 300,000.00
112 Dempul Kayu Kg 30,300.00
113 Dop PVC Ø 4" Buah 20,000.00
114 Dop PVC Ø 3" Buah 15,000.00
115 Dop PVC Ø 2" Buah 10,000.00
116 Door Stopper Buah 15,000.00
117 Door Closer Buah 250,000.00
Folding Door Buah 501,700.00
118 Elastomer Bearing Pad Type I (300+350+36) Buah 535,000.00
119 Elastomer Bearing Pad Type 2 (300+350+36) Buah 696,000.00
120 Elastomer Bearing Pad Type 3 (300+350+36) Buah 990,000.00
121 Engsel Jendela 3" Psg 29,700.00
122 Engsel Pintu 4" Buah 33,000.00
123 Eternit 1x1 Tabusmen Lbr 18,000.00
124 Expantion Joint m' 115,500.00
125 Floor Drain "TX 1B ex Toto Buah 414,000.00
126 Flux Oil ( untuk emulsi) Liter 25,000.00
127 Aluminium Plat Tipis Lbr 10,000.00
128 Gemuk (Greese) Liter 25,100.00
129 Gorong-Gorong Beton dia 30 (tanpa tulangan) m' 100,000.00
130 Gorong-Gorong Beton dia 40 (tanpa tulangan) m' 137,500.00
131 Gorong-Gorong Beton dia 60 (tanpa tulangan) m' 154,300.00
132 Gorong-Gorong Beton dia 80 (tanpa tulangan) m' 168,400.00
133 Gorong-Gorong Beton dia 100 (tanpa tulangan) m' 225,000.00
134 GRC / Kal.SIBOARD 3.5x1200x2400 Lbr 64,300.00
135 GRC / Kal.SIBOARD 4.5x1200x2400 Lbr 135,000.00
136 Grendel Jendela Buah 10,000.00
137 Grendel Pintu Buah 16,500.00
138 Gypsum Board 9mm : uk 120x240 cm Lbr 66,000.00
138 Gypsum Board 12mm : uk 120x240 cm Lbr 90,900.00
139 Gerobak Dorong Unit 320,000.00
140 Handle Pintu bh 294,000.00
Pull handle 450 mm bh 403,700.00
Pull handle 300 mm bh 286,000.00
Lever handle set 319,000.00
Handle tanam bh 104,500.00
Cylinder set 110,000.00
Lockcase set 253,000.00
Flush bolt Buah 198,000.00
Grendel gudang Buah 159,000.00
Escutcheon Buah 67,100.00
141 Les Gypsum polos m' 17,000.00
142 IJUK ikat 20,500.00
143 Kaca Polos 3mm m² 125,000.00
144 Kaca Polos 5mm m² 150,000.00
145 Kaca Polos 8mm m² 200,000.00
146 Kaca Rayben 3mm m² 200,000.00
147 Kaca Rayben 5mm m² 320,000.00
Kaca Naco 5mm m² 104,000.00
148 Kapur Hidrasi m³ 170,700.00
149 Karet Alas Genteng 90cm m' 8,000.00
Karet List kaca m' 77,000.00
150 Kait Angin Buah 8,000.00
151 Kawat Beton/Bindrat Kg 24,800.00
152 Kawat Las Kg 25,200.00
153 Kawat Ram Ayam m² 35,000.00
154 Kayu Kls I (Balok) Sensow m³ 9,000,000.00
155 Kayu Kls I (Balok) Sawmil m³ 13,100,000.00
156 Kayu Kls I (Papan) Sawmil (Bayam) m³ 15,000,000.00
157 Kayu Kls II (Balok) Sawmil m³ 3,160,000.00
158 Kayu Kls II (Papan) Sawmil m³ 3,780,000.00
159 Kayu Kls III (Balok) Sawmil Lokal m³ 2,085,000.00
160 Kayu Kls III (Papan) Mall 2/30 , 2/40 m³ 2,182,000.00
161 Kayu Kls IV (Balok) Mall 4/6 m³ 1,550,000.00
162 Kayu Dolken dia 8-10 cm (p=4 m) Btg 60,000.00
163 Kayu Les Profil 3x3 (4m) m' 5,300.00
164 Kayu Les Profil 4x4 (4m) m' 6,500.00
165 Kayu Les Profil 5x5 (4m) m' 9,000.00
166 Kayu Struktur m³ 9,000,000.00
167 Kayu Bakar m³ 178,000.00
168 Kayu Perancah 5/10 - 4 Btg 41,700.00
169 Kayu Balok 3/5 Kls I Btg 60,000.00
170 Kayu Balok 3/5 Kls II Btg 20,000.00
171 Kayu Balok 4/6 Kls I Btg 100,000.00
172 Kayu Balok 4/6 Kls II Btg 30,000.00
173 Kayu Balok 5/7 Kls I Btg 147,000.00
174 Kayu Balok 5/7 Kls II Btg 45,000.00
175 Kayu Balok 5/10 Kls I Btg 210,000.00
176 Kayu Balok 5/10 Kls II Btg 60,000.00
177 Kayu Balok 5/12 Kls II 305,000.00
178 Kayu Balok 6/12 Kls I Btg 305,000.00
179 Kayu Balok 8/12 Kls I Btg 330,000.00
180 Kayu Papan 2/20 Kls I Lbr 240,000.00
181 Kayu Papan 2/20 Kls II Lbr 57,000.00
182 Kerosine (Minyak Tanah) Liter 10,500.00
183 Kawat Beronjong 3mm (1 Roll = 50kg) m' 10,500.00
184 Kawat Beronjong jadi (2x1x0.5 m) dia 2.7 mm ; 9 kg Kg 25,000.00
185 Kawat Beronjong jadi (2x1x0.5 m) dia 3 mm ; 9 kg Kg 27,500.00
186 Kertas Gosok/Amplas Kayu Lbr 7,000.00
187 Kusen dan Pintu PVC Toilet Unit 250,000.00
188 Klep dia 3/4" ex onda Buah 40,000.00
189 Kansteen Beton k.300 (18/20/40 cm) Pcs 33,000.00
190 Kansteen Beton k.300 (15/30/40 cm) Pcs 38,500.00
191 Kansteen Beton k.300 (16/30/50 cm) Pcs 49,500.00
192 Kansteen Beton k.300 (15/30/60 cm) Pcs 55,000.00
193 Kansteen Beton k.300 (15/25/50 cm) Pcs 44,000.00
194 Kansteen Beton k.300 (15/28/60 cm) Pcs 55,000.00
195 Kansteen Beton k.300 (22/25/60 cm) Pcs 71,500.00
196 Kansteen Beton k.300 (25/30/60 cm) Pcs 82,500.00
197 Kansteen Beton k.300 (15/40/50 cm) Pcs 55,000.00
198 Kansteen Beton k.300 (20/30/40 cm) Pcs 41,200.00
199 Kran Air SKL 1/2 inci Buah 19,000.00
200 Kran Dinding tipe TMN Picarlo Buah 56,000.00
201 Kran Zink T 30 AR13NV7N ex Toto Buah 300,000.00
202 Kitchenk Zink "Hwaco 1L" Unit 250,000.00
203 Kunci Tanam Yale 1x Putar Set 130,000.00
204 Kunci Tanam Yale 2x Putar Set 80,000.00
205 Kwas Cat Buah 19,500.00
206 Lambriziring t: 4mm (4 m') Lembar 14,000.00
207 Lampu Hemat Energi 8 Watt Buah 57,800.00
208 Lampu Hemat Energi 14 Watt Buah 51,300.00
209 Lampu Hemat Energi 18 Watt Buah 51,200.00
210 Lampu Hemat Energi 23 Watt Buah 63,600.00
211 Lampu TL 1 x 10 watt Buah 45,000.00
212 Lampu TL 1 x 20 watt Buah 50,000.00
213 Lampu TL 1 x 40 watt Buah 60,000.00
214 Lampu TL 2 x 13 watt Grille (panasonic) Buah 30,000.00
215 Lampu TL 2 x 36 watt Grille (panasonic) Buah 40,000.00
Lampu Sorot 70watt Philips Buah 975,000.00
216 Lem Kayu Fox Kg 28,000.00
Lem Kaca Kg 28,000.00
217 List Profil 5cm Gysum m' 25,000.00
218 List Plafond Datar m' 14,100.00
219 List Plafond Profil m' 15,600.00
220 Mesin Jet Pump Kap 250 watt Groundfoss Unit 960,000.00
221 Mesin Pompa tekan kap 150 watt Groundfoss Unit 600,000.00
222 Meni Kayu Kg 35,000.00
223 Minyak Pelumas Liter 45,000.00
224 Mur Baut 5/8 Buah 5,100.00
225 Pagar Brc 240x120 cm m² 390,000.00
226 Pagar Brc 240x150 cm m² 425,000.00
227 Pagar Brc 240x190 cm m² 665,000.00
228 Tiang dia 1.5" (Tinggi = 120 cm) Buah 170,000.00
229 Tiang dia 1.5" (Tinggi = 150 cm) Buah 235,000.00
230 Tiang dia 1.5" (Tinggi = 190 cm) Buah 295,000.00
231 Uclip Buah 1,800.00
232 Panel Beton ukuran 5x40x240 cm Lembar 154,000.00
233 Tiang Panel ukuran 19.5x16.5x260 cm Btg 247,500.00
234 Tiang Panel ukuran 19.5x16.5x320 cm Btg 268,800.00
235 Tiang Panel ukuran 19.5x16.5x380 cm Btg 330,000.00
236 Tiang Panel ukuran 19.5x16.5x420 cm Btg 379,500.00
237 Paku 8-12 cm Kg 20,000.00
238 Paku 5-10 cm Kg 20,000.00
239 Paku 1-3 cm Kg 20,000.00
240 Paku Gypsum Kg 45,000.00
241 Paku Klem Kg 22,000.00
242 Paku Ramset Kg 1,000.00
243 Paku Seng Kg 30,000.00
244 Paku Skrup Buah 600.00
245 Paku Beton 8-10 dos 15,500.00
246 Pasir Beton m³ 165,000.00
247 Pasir Pasang m³ 165,000.00
248 Pasir urug/pasir alas/pengikat pilihan m³ 84,000.00
249 Pelampung Otomatis Buah 56,000.00
250 Paving Block Kotak T.6 cm K.300 (44 bh/m²) m² 77,000.00
251 Paving Block Kotak T.6 cm K.400 (44 bh/m²) m² 82,500.00
252 Paving Block Kotak T.8 cm K.300 (44 bh/m²) m² 93,500.00
253 Paving Block Kotak T.8 cm K.400 (44 bh/m²) m² 99,000.00
254 Paving Block Hexagon 8 cm K=400 m² 99,000.00
255 Paving Block Kotak T.6 cm K.300 (44 bh/m²) Colour m² 94,000.00
256 Paving Block Kotak T.6 cm K.400 (44 bh/m²) Colour m² 99,500.00
257 Paving Block Kotak T.8 cm K.300 (44 bh/m²) Colour m² 110,500.00
258 Paving Block Kotak T.8 cm K.400 (44 bh/m²) Colour m² 116,000.00
259 Topi Uskup 6cm K.300 Buah 6,600.00
260 Topi Uskup 8cm K.300 Buah 7,700.00
261 Paving Segi Empat 30x30x6 cm u/Difable Kuning Buah 27,500.00
262 Box Inlet 42x21x17 cm + Tutup Grill 42x21x6' set 275,000.00
263 Pipa Besi GIP dia 1/2" SNI, t=2.6 mm ; p= 6m Btg 110,000.00
264 Pipa Besi GIP dia 3/4" SNI, t=2.6 mm ; p= 6m Btg 145,000.00
265 Pipa Besi GIP dia 1 1/4" SNI, t=3.2 mm ; p= 6m Btg 275,000.00
266 Pipa Besi GIP dia 2" SNI, t=3.3 mm ; p= 6m Btg 408,000.00
267 Pipa Besi GIP dia 2 1/2" SNI, t=3.3 mm ; p= 6m Btg 544,000.00
268 Pipa GIP Medium A dia 75 mm (3") Btg 56,000.00
269 Pipa GIP Medium A dia 100 mm (4") Btg 860,000.00
270 Pipa GIP Medium A dia 150 mm (6") Btg 1,860,000.00
271 Pipa GIP Medium A dia 200 mm (8") Btg 2,860,000.00
272 Pipa Besi Hitam 1/2" SNI, t=2.6 mm; P=6m Btg 72,000.00
273 Pipa Besi Hitam 1 1/2" SNI, t=3 mm; P=6m Btg 199,000.00
274 Pipa Besi Hitam 2" SNI, t=3 mm; P=6m Btg 254,000.00
275 Pipa Besi Hitam 3" Medium A , t=2 mm; P=6m Btg 298,000.00
276 Pipa Besi Hitam 4" Medium A , t=2.8 mm; P=6m Btg 610,000.00
277 Pipa Besi Hitam 5" Medium A , t=2.8 mm; P=6m Btg 776,000.00
278 Pipa PVC dia 1/2" AW 4m Btg 21,000.00
279 Pipa PVC dia 3/4" AW 4m Btg 28,300.00
280 Pipa PVC dia 1" AW 4m Btg 38,600.00
281 Pipa PVC dia 2" AW 4m Btg 89,000.00
282 Pipa PVC dia 2" D 4m Btg 53,000.00
283 Pipa PVC dia 3" AW 4m Btg 177,500.00
284 Pipa PVC dia 3" D 4m Btg 91,000.00
285 Pipa PVC dia 4" AW 4m Btg 290,000.00
286 Pipa PVC dia 4" D 4m Btg 143,000.00
287 Pipa PVC dia 6" D 4m Btg 292,000.00
288 Bend PVC 45 dia 75 mm Buah 82,500.00
289 Bend PVC 22.5 dia 75 mm Buah 75,000.00
290 Double Joint Dia 50mm Buah 157,500.00
291 Double Joint Dia 75mm Buah 17,500.00
292 Double Joint Dia 100mm Buah 202,500.00
293 Double Joint Dia 150mm Buah 412,500.00
294 Double Joint Dia 200mm Buah 882,500.00
295 Flens Socket dia 50mm Buah 157,500.00
296 Flens Socket dia 75mm Buah 277,500.00
297 Flens Socket dia 100mm Buah 337,500.00
298 Flens Socket dia 150mm Buah 565,000.00
299 Flens Socket dia 200mm Buah 742,000.00
300 Flens Spigot dia 50mm Buah 157,500.00
301 Flens Spigot dia 75mm Buah 277,500.00
302 Flens Spigot dia 100mm Buah 337,500.00
303 Flens Spigot dia 150mm Buah 565,000.00
304 Flens Spigot dia 200mm Buah 742,000.00
305 Gate Valve All Flange dia 50mm Buah 470,000.00
306 Gate Valve All Flange dia 75mm Buah 870,000.00
307 Gate Valve All Flange dia 100mm Buah 970,000.00
308 Gate Valve All Flange dia 150mm Buah 1,970,000.00
309 Gate Valve All Flange dia 200mm Buah 2,970,000.00
310 Karet Packing dia 50mm Buah 17,500.00
311 Karet Packing dia 75mm Buah 20,000.00
312 Karet Packing dia 100mm Buah 25,000.00
313 Karet Packing dia 150mm Buah 50,000.00
314 Karet Packing dia 200mm Buah 50,000.00
315 Pipa HDPE dia 50 mm m' 155,000.00
316 Pipa HDPE dia 75 mm m' 315,000.00
317 Pipa HDPE dia 100 mm m' 505,000.00
318 Pipa HDPE dia 150 mm m' 1,230,000.00
319 Pipa HDPE dia 200 mm m' 375,000.00
320 Pipa PVC RR 12.5 dia 50mm (2") m' 135,000.00
321 Pipa PVC RR 12.5 dia 75mm (3") m' 275,000.00
322 Pipa PVC RR 12.5 dia 100mm (4") m' 375,000.00
323 Pipa PVC RR 12.5 dia 150mm (6") m' 805,000.00
324 Pipa PVC RR 12.5 dia 200mm (8") m' 1,205,000.00
325 Reducer PVC RR/SC dia 75x50 mm Buah 115,000.00
326 Tee PVC RR/SC dia 100x100mm Buah 397,500.00
327 Tee PVC RR/SC dia 150x150mm Buah 500,000.00
328 Tee PVC RR/SC dia 200x200mm Buah 985,000.00
329 Tee PVC RR KNEE ELBOW 90 dia 50mm (2") Buah 67,200.00
330 Tee PVC RR KNEE ELBOW 45 dia 50mm (2") Buah 59,600.00
331 Tee PVC RR KNEE ELBOW 90 dia 75mm (3") Buah 141,600.00
332 Tee PVC RR KNEE ELBOW 45 dia 75mm (3") Buah 122,400.00
333 Ventil Udara dia 25mm Buah 750,000.00
334 Valve Cover dia 100mm Buah 200,000.00
335 Socket Gip dia 25mm Buah 20,000.00
336 Lem Issarplast @1/2kg Klg 65,000.00
337 Plamir Kayu Kg 30,500.00
338 Palmur Tembok dulux dan setara (4kg) Kg 23,900.00
339 Plat Besi Lbr 425,000.00
340 Politur Teak Oil Kg 46,500.00
341 Plastik Tipis m² 6,200.00
342 Pompa Air Sanyo Unit 480,000.00
343 Pompa Tangan Buah 400,300.00
344 Premium Liter 6,450.00
345 Residu/Minyak Bekisting Liter 50,100.00
346 Roof Drain Metal Buah 35,000.00
347 Sambungan Pipa keni 1" PVC Buah 4,000.00
348 Sambungan Pipa keni 1/2" PVC Buah 3,000.00
349 Sambungan Pipa keni 3/4" PVC Buah 3,000.00
350 Sambungan Pipa keni 2" PVC Buah 25,500.00
351 Sambungan Pipa Lurus 1/2" PVC Buah 10,000.00
352 Sambungan Lurus L. 1/2" PVC Buah 15,000.00
353 Saringan Air Besi m² 45,000.00
354 Saringan Air Plastik m² 25,000.00
355 Sealent Tube 105,000.00
356 Seal Tape Buah 14,000.00
357 Semen Bosowa @50 kg Zak 55,000.00
358 Semen Tonasa @50 kg Zak 58,000.00
359 Semen Bosowa @40 kg Zak 44,500.00
360 Semen Tonasa @40 kg Zak 48,000.00
361 Semen Warna Kg 15,000.00
362 Sendi dan Roll Psg 6,120,000.00
363 Seng Gelombang BJLS 0.20 (6 Kaki) Kaki 8,000.00
364 Seng Gelombang BJLS 0.25 (6 Kaki) Kaki 10,600.00
365 Seng Gelombang BJLS 0.30 (6 Kaki) Kaki 12,500.00
366 Seng Gelombang BJLS 0.35 (6 Kaki) Kaki 13,900.00
367 Seng Gelombang Kecil Kaki 7,000.00
368 Seng Plat BJLS 0.2 30 cm (6 Kaki) Lbr 48,000.00
369 Seng Plat BJLS 0.22 30 cm (6 Kaki) Lbr 52,800.00
370 Seng Plat BJLS 0.30 30 cm (6 Kaki) Lbr 58,000.00
371 Seng Plat BJLS 0.35 30 cm (6 Kaki) Lbr 61,000.00
372 Shower Spray "Tipe THX 20 NBPIV ex Toto Unit 234,000.00
373 Shower set "Type TX 423 SZ ex Toto Unit 661,000.00

374 Slot Tanam Buah 90,000.00


375 Skrup Beton/Fixer Buah 1,100.00
376 Solar Industri (Non Subsidi) Liter 13,100.00
377 Solar Subsidi Ltr 5,650.00
378 Stand Nako Psg 135,100.00
379 Stop Kran dia 1" ex onda Buah 67,600.00
380 Selinder Buah 84,000.00
381 Tanah Urugan/Timbunan m³ 87,500.00
382 Tangki Air Fiber 500 liter Excel Buah 725,000.00
383 Tangki Air Fiber 1000 liter Excel Buah 1,100,000.00
384 Tangki Air Fiber 2000 liter Excel Buah 2,800,000.00
385 Teakwood 120x240/ 3mm Lbr 89,000.00
386 Tempat Sabun Trisensa Buah 55,000.00
387 Tee Gip Ø 1/2" Buah 7,100.00
388 Tee Gip Ø 2" Buah 40,000.00
389 Tee Gip Ø 3/4" Buah 11,100.00
390 Tee PVC Ø1/2" Buah 3,000.00
391 Tee PVC Ø3/4" Buah 3,100.00
392 Tee PVC Ø1" Buah 5,000.00
393 Tee PVC Ø1 1/4" Buah 9,000.00
394 Tee PVC Ø1 1/2" Buah 12,000.00
395 Tee PVC Ø2" Buah 19,000.00
396 Tee PVC Ø3" Buah 43,000.00
397 Tee PVC Ø4" Buah 35,100.00
398 Tegel Keramik 20x20 (25bh/dos) dus 59,000.00
Tegel Keramik 25x40 (10bh/dos) dus 77,000.00
399 Tegel Keramik 20x25 (20bh/dos) dus 59,000.00
400 Tegel Keramik 30x30 (11bh/dos) dus 59,500.00
401 Tegel Keramik 40x40 (6bh/dos) dus 67,500.00
402 Tegel Keramik 50x50 (4bh/dos) dus 120,000.00
403 Tegel Keramik 60x60 (3bh/dos) dus 180,000.00
404 Tegel Keramik Anti Slip 20x20 dus 58,000.00
405 Tegel Keramik Anti Slip 30x30 dus 58,000.00
406 Granit Tile (40x40 cm) isi 6 dus 250,000.00
407 Granit Tile (60x60 cm) isi 4 dus 289,300.00
408 Plint Keramik 8x30 cm Buah 13,500.00
409 Plint Granitetile 8x40 cm Buah 15,000.00
410 Thinner Ltr 29,000.00
411 Tripleks 3mm (120x240 cm) Lbr 53,500.00
412 Tripleks 4mm (120x240 cm) Lbr 65,000.00
413 Tripleks 6mm (120x240 cm) Lbr 78,800.00
414 Tripleks 9mm (120x240 cm) Lbr 130,000.00
415 Tripleks 12mm (120x240 cm) Lbr 155,000.00
416 Taekwood 3mm Lbr 75,000.00
417 Tempat Sabun 'S 11 N Ex Totot Buah 43,000.00
418 Urinoir Unit 1,780,000.00
419 U-Ditch 30x30x120 cm Buah 341,550.00
420 U-Ditch 30x40x120 cm Buah 350,900.00
421 U-Ditch 40x40x120 cm Buah 480,700.00
422 U-Ditch 40x60x120 cm Buah 518,650.00
423 U-Ditch 60x60x120 cm Buah 796,950.00
424 U-Ditch 60x80x120 cm Buah 999,350.00
425 U-Ditch 80x80x120 cm Buah 1,111,750.00
426 U-Ditch 800x100x120 cm Buah 1,335,750.00
427 Cover Uditch uk 30x60 cm Buah 113,850.00
428 Cover Uditch uk 40x60 cm Buah 126,500.00
429 Cover Uditch uk 60x60 cm Buah 202,400.00
430 Cover Uditch uk 30x80 cm Buah 290,950.00
431 V KNIE 3/4" (besi) Buah 8,100.00
432 V KNIE 1" (besi) Buah 11,200.00
433 V Neple 3/4" (besi) Buah 7,200.00
434 V Neple 1" (besi) Buah 8,000.00
435 Vernish Ltr 43,000.00
436 Wastafel 'LW 240 CJ ex Toto, Komplit kran & acc Unit 643,500.00
437 Wood Filter (dulux 4kg) Kg 21,000.00
438 Woodplank 400x30 cm Lbr 75,000.00
439 Woodplank 400x20 cm Lbr 65,000.00
440 Waterproofing (5kg) Kg 16,700.00
Waterprofing (10 x 10000 cm) Flashband self addhisive Roll 257,500.00
441 Lakban foil/roll Roll 12,300.00
442 Box Panel PVC isi 4 MCB legran Buah 160,000.00
443 Down Light /PLC 13 W Buah 92,000.00
444 Fitting Plafond + Lampu SL (Panasonic) Buah 10,500.00
445 NYY 2x1.5 mm² m' 16,100.00
NYY 4x16 mm2 m' 37,000.00
NYY 4x10 mm2 m' 69,000.00
NYFGbY 4x10 mm2 m' 94,000.00
446 NYM 3x2.5 mm² m' 21,100.00
447 NYM 2x2.5 mm² m' 12,100.00
448 Outlet TV (Broco) Buah 50,000.00
449 Outlet Telephone (Broco) Buah 50,000.00
450 Saklar Tunggal Buah 8,500.00
451 Saklar Ganda Buah 12,500.00
452 Stop Kontak Buah 14,000.00
452 Stop Kontak Inbow Buah 33,000.00
452 Stop Kontak Outbow Buah 37,000.00
452 Stop Kontak AC Buah 127,000.00
453 Fitting (elbow,male bsuh, joint coupling) Buah 17,300.00
454 Pipa dia 5/8"-4m (jenis C untuk instalasi listrik) Buah 25,000.00
455 Pipa dia 3/4"-4m (jenis C untuk instalasi listrik) Buah 13,000.00
456 Klem Kabel Meet Clips No.10 Buah 170.00
457 Klem Kabel Meet Clips No.12 Buah 200.00
458 Inbow Dos Buah 3,500.00
T-Dos Buah 8,000.00
459 dop PVC 3/4 Buah 3,500.00
460 Seal Tape Buah 8,400.00
461 Isolasi Buah 12,500.00
462 MCB 6 A Legran Buah 6,000.00
463 MCB 4 A Legran Buah 65,000.00
464 Kabel Telephone 4x0.5 mm m' 16,800.00
Kabel Ladder tray 600x100x2400x1.2 mm m' 323,000.00
Kabel Tray 600x100x2400x1.2 mm m' 287,000.00
Kabel Tray 300x100x2400x1.2 mm m' 154,000.00
Elbow Kabel Tray 600x100x1.2 mm Buah 353,000.00
Tee Kabel Tray 600x300x100x1.2 mm Buah 312,000.00
465 Tee Dua 5/8 Buah 12,000.00
466 Drymix (Semen Perekat Instant Bata Ringan) 40 kg 100,000.00
467 Shunda Plafond PVC 0.8 cm x 20 cm Buah 34,000.00
468 Panel HPL Polos 120x244 cm / Taco Lbr 170,000.00
469 Panel HPL Motif 120x244 cm / Taco Lbr 180,000.00
470 Tegel Precast Tactile Line/Spot 300x300 mm Buah 25,000.00
471 VID Granite Tactile Line/Spot 300x300 mm, 10pcs/3m' dus 578,000.00
472 Banner m² 28,000.00
473 Savety helmet bh 45,000.00
474 Harness Full body set 250,000.00
475 Savety jacket bh 55,000.00
476 Rain Coat psg 190,000.00
477 Savety Google bh 50,000.00
478 Savety Shoes psg 345,000.00
479 Masker bh 25,000.00
480 Sarung tangan psg 15,000.00
481 Poster keselamatan bh 65,000.00
482 First Aid Kit set 350,000.00
483 Papan pengumuman K3 bh 250,000.00
484 Asuransi ls 65,000.00
485 Mesin Las h.a 1,000,000.00
486 Pintu besi / pintu aluminium m² 1,650,000
487 Jendela besi m² 550,000
488 Pintu besi baja m² 800,000
Rel Pintu Dorong set 1,100,000.00
Alumunium Stifner panel m' 75,000.00
Alumunium. Siku 30x16 m' 75,000.00
Aluminium Porporated m² 413,380.00
Bracket besi siku 70.70.7 kg 12,000.00
Dynabolt M 10 x 120 bh 5,000.00
Mur + baut M 10 x 70 bh 2,031.00
Zincromate kg 50,000.00
Ramsel Nails bh 5,000.00
Pemadam Api Ringan (PAR) 3 kg, Co2 bh 550,000.00
Box Panel uk. 100x80x30 cm bh 3,154,900.00
Ammeter bh 125,000
Volt Meter bh 110,000
Volt Selektor Switch bh 294,500
Indikator lamp (RYG) bh 65,000
Diazed Fuse 2A bh 14,500
MCCB 3P 65A, 7.5 kA pcs 1,592,800
MCB 1P 16A, 4.5 kA pcs 862,730
MCB 1P 10A, 4.5 kA pcs 91,355
MCB 1P 6A, 4.5 Ka pcs 91,355
MCB 1P 4A, 4.5 Ka pcs 91,355
MCB 3P 45A, 7.5 kA pcs 749,500
MCB 3P 40A, 25 kA pcs 1,142,240
MCB 3P 25A, 16 kA pcs 888,140
MCB 3P 16A, 16 kA pcs 862,730
RENCANA ANGGARAN BIAYA

REKAPITULASI

NO URAIAN PEKERJAAN

I PRELIMINARY
II PEKERJAAN GEDUNG TRIBUN UTAMA
A STRUKTUR
B ARSITEKTUR
III PEKERJAAN GEDUNG PENCAT SILAT DAN GEDUNG ANGGAR
A STRUKTUR
B ARSITEKTUR
IV PEKERJAAN ELEKTRIKAL
V PEKERJAAN MEKANIKAL
VI PEKERJAAN SITE
A STRUKTUR
B ARSITEKTURAL
Total Real Cost ( Upah + Bahan )
Ppn 10%
TOTAL
DIBULATKAN

TERBILANG : Enam Milyar Dua Ratus Sembilan Puluh Sembilan Juta Tuju Ratus Empat Pul
NCANA ANGGARAN BIAYA

REKAPITULASI

URAIAN PEKERJAAN JUMLAH

#REF!
IBUN UTAMA
Rp 569,959,096.81
Rp 684,255,540.45
NCAT SILAT DAN GEDUNG ANGGAR
Rp 1,798,908,290.04
Rp 2,126,370,035.31
Rp 361,783,105.24
Rp 106,081,661.14

#REF!
#REF!
Total Real Cost ( Upah + Bahan ) #REF!
Ppn 10% #REF!
TOTAL #REF!
DIBULATKAN #REF!

a Ratus Sembilan Puluh Sembilan Juta Tuju Ratus Empat Puluh Tuju Ribu Rupiah
Rp 6,300,000,000.00
#REF!

#REF!

#REF!
NO VOLUME
1 BESI

2 SEMEN

3 PASIR

4 BATU KALI

5 BATU BATA

6 KAYU

10