DAFTAR ANALISA
PERHITUNGAN UNIT PRICE
DAERAH KABUPATEN TANA TIDUNG
TAHUN ANGGARAN 2020

No. Uraian Pekerjaan Harga Satuan (Rp.) Upah Kerja (Rp.) Harga Bahan (Rp.) Jumlah (Rp.)

1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank per M1
0.012 M3 Balok meranti 5/7 Rp 900,000.00 Rp 10,800.00
0.020 Kg Paku biasa 2" - 5" Rp 11,500.00 Rp 230.00
0.007 M3 Papan meranti 3/20 Rp 1,000,000.00 Rp 7,000.00
0.100 Oh Tukang kayu Rp 65,000.00 Rp 6,500.00
0.100 Oh Pekerja Rp 50,000.00 Rp 5,000.00
0.010 Oh Kepala tukang Rp 75,000.00 Rp 750.00
0.005 Oh Mandor Rp 87,000.00 Rp 435.00
Rp 12,685.00 Rp 18,030.00 Rp 30,715.00

II. PEKERJAAN TANAH


1 Galian tanah biasa sedalam 1 meter per 1 M3
0.400 Oh Pekerja Rp 50,000.00 Rp 20,000.00
0.040 Oh Mandor Rp 87,000.00 Rp 3,480.00
Rp 23,480.00 Rp 23,480.00

6 Urugan kembali per 1 M3


0.192 Oh Pekerja Rp 50,000.00 Rp 9,600.00
0.019 Oh Mandor Rp 87,000.00 Rp 1,653.00
Rp 11,253.00 Rp 11,253.00

7 Pemadatan tanah per 1 M3


0.250 Oh Pekerja Rp 50,000.00 Rp 12,500.00
0.050 Oh Mandor Rp 87,000.00 Rp 4,350.00
Rp 16,850.00 Rp 16,850.00

8 Urugan pasir per 1 M3


1.200 Oh Pasir urug Rp 85,000.00 Rp 102,000.00
0.300 Oh Pekerja Rp 50,000.00 Rp 15,000.00
0.010 Oh Mandor Rp 87,000.00 Rp 870.00
Rp 15,870.00 Rp 102,000.00 Rp 117,870.00

9 Urugan tanah per 1 M3


1.150 Oh tanah urug Rp 10,000.00 Rp 11,500.00
0.250 Oh Pekerja Rp 50,000.00 Rp 12,500.00
0.025 Oh Mandor Rp 87,000.00 Rp 2,175.00
Rp 14,675.00 Rp 11,500.00 Rp 26,175.00

III. PEKERJAAN PONDASI (SNI 03-2836-2002)


2 Pasangan pondasi batu gunung 1 Pc : 4 Ps per per 1 M3
1.200 M3 Batu gunung Rp 110,000.00 Rp 132,000.00
155.000 Kg Semen Portland Rp 1,400.00 Rp 217,000.00
0.320 M3 Pasir pasang Rp 110,000.00 Rp 35,200.00
0.750 Oh Pekerja Rp 50,000.00 Rp 37,500.00
0.600 Oh Tukang batu Rp 65,000.00 Rp 39,000.00
0.350 Oh Kepala tukang Rp 75,000.00 Rp 26,250.00
0.175 Oh Mandor Rp 87,000.00 Rp 15,225.00
Rp 117,975.00 Rp 384,200.00 Rp 502,175.00

4 Pasangan batu kosong/Aanstamping per 1 M3


1.200 M3 Batu gunung Rp 110,000.00 Rp 132,000.00
0.300 M3 Pasir pasang Rp 110,000.00 Rp 33,000.00
0.780 Oh Pekerja Rp 50,000.00 Rp 39,000.00
0.390 Oh Tukang batu Rp 65,000.00 Rp 25,350.00
0.039 Oh Kepala tukang Rp 75,000.00 Rp 2,925.00
0.039 Oh Mandor Rp 87,000.00 Rp 3,393.00
Rp 70,668.00 Rp 165,000.00 Rp 235,668.00
Page 2 of 84

No. Uraian Pekerjaan Harga Satuan (Rp.) Upah Kerja (Rp.) Harga Bahan (Rp.) Jumlah (Rp.)

1 2 3 4 5 6

IV. PEKERJAAN DINDING


1 Pasangan batu bata dengan 1 Pc : 4 Ps per M3 - BOW - G.33.b + G.27
12.000 Bh Bataco Rp 4,500.00 Rp 54,000.00
2.650 kg Semen PC Rp 1,400.00 Rp 3,710.00
0.026 M3 Pasir pasang Rp 110,000.00 Rp 2,860.00
0.225 Oh Mandor Rp 87,000.00 Rp 19,575.00
0.150 Oh Kepala tukang batu Rp 75,000.00 Rp 11,250.00
1.500 Oh Tukang batu Rp 65,000.00 Rp 97,500.00
2.500 Oh Pekerja Rp 50,000.00 Rp 125,000.00
Rp 253,325.00 Rp 60,570.00 Rp 313,895.00

3 1 M2 Pasang dinding roster/terawang (11 x 11 x 24) cm


36.000 Bh Roster/terawang Rp 8,000.00 Rp 288,000.00
12.800 Kg Semen Portland Rp 1,400.00 Rp 17,920.00
0.035 M3 Pasir pasang Rp 110,000.00 Rp 3,850.00
0.300 Oh Pekerja Rp 87,000.00 Rp 26,100.00
0.100 Oh Tukang batu Rp 75,000.00 Rp 7,500.00
0.010 Oh Kepala tukang Rp 65,000.00 Rp 650.00
0.015 Oh Mandor Rp 50,000.00 Rp 750.00
Rp 35,000.00 Rp 309,770.00 Rp 344,770.00

V. PEKERJAAN BETON
1 Pembesian dengan besi polos per 1 Kg
1.000 Kg Besi beton Rp 11,000.00 Rp 11,000.00
0.015 Kg Kawat bendrat Rp 23,000.00 Rp 345.00
0.007 Oh Pekerja Rp 87,000.00 Rp 609.00
0.005 Oh Tukang besi Rp 75,000.00 Rp 375.00
0.005 Oh Kepala tukang Rp 65,000.00 Rp 325.00
0.003 Oh Mandor Rp 50,000.00 Rp 150.00
Rp 1,459.00 Rp 11,345.00 Rp 12,804.00

2 Pasang bekisting per 1 M3


0.040 M3 Kayu bekisting Rp 728,000.00 Rp 29,120.00
0.300 Kg Paku biasa 2" - 5" Rp 11,500.00 Rp 3,450.00
0.100 Lt Minyak bekisting Rp 5,000.00 Rp 500.00
0.300 Oh Pekerja Rp 87,000.00 Rp 26,100.00
0.260 Oh Tukang batu Rp 75,000.00 Rp 19,500.00
0.026 Oh Kepala tukang Rp 65,000.00 Rp 1,690.00
0.005 Oh Mandor Rp 50,000.00 Rp 250.00
Rp 47,540.00 Rp 33,070.00 Rp 80,610.00
3 1 M3 Bongkar bekisting = 1/5 x upah pasang bekisting Rp 16,122.00

12 Membuat beton dengan mutu K 225 per M3


300.000 Kg Semen portland Rp 1,400.00 Rp 420,000.00
0.650 M3 Pasir pasang Rp 110,000.00 Rp 71,500.00
0.650 M3 Koral beton Rp 242,000.00 Rp 157,300.00
4.000 Oh Pekerja Rp 87,000.00 Rp 348,000.00
1.000 Oh Tukang batu Rp 75,000.00 Rp 75,000.00
0.100 Oh Kepala tukang Rp 65,000.00 Rp 6,500.00
0.300 Oh Mandor Rp 50,000.00 Rp 15,000.00
Rp 444,500.00 Rp 648,800.00 Rp 1,093,300.00

VI. PEKERJAAN PLESTERAN (SNI 03-2837-2002)


1 Plesteran 1 Pc : 2 Ps, tebal 15 mm per 1 M2
8.520 Kg Semen portland Rp 1,400.00 Rp 11,928.00
0.017 M3 Pasir pasang Rp 110,000.00 Rp 1,870.00
0.200 Oh Pekerja Rp 87,000.00 Rp 17,400.00
0.150 Oh Tukang batu Rp 75,000.00 Rp 11,250.00
0.015 Oh Kepala tukang Rp 65,000.00 Rp 975.00
0.010 Oh Mandor Rp 50,000.00 Rp 500.00
Rp 30,125.00 Rp 13,798.00 Rp 43,923.00
Page 3 of 84

No. Uraian Pekerjaan Harga Satuan (Rp.) Upah Kerja (Rp.) Harga Bahan (Rp.) Jumlah (Rp.)

1 2 3 4 5 6

2 Plesteran 1 Pc : 4 Ps, tebal 15 mm per 1 M2


5.200 Kg Semen portland Rp 1,400.00 Rp 7,280.00
0.020 M3 Pasir pasang Rp 110,000.00 Rp 2,200.00
0.200 Oh Pekerja Rp 87,000.00 Rp 17,400.00
0.150 Oh Tukang batu Rp 75,000.00 Rp 11,250.00
0.015 Oh Kepala tukang Rp 65,000.00 Rp 975.00
0.010 Oh Mandor Rp 50,000.00 Rp 500.00
Rp 30,125.00 Rp 9,480.00 Rp 39,605.00

VII. PEKERJAAN KAYU


3 Memancang tiang pada tanah lunak per btg - BOW - F.1
0.025 Oh Mandor Rp 87,000.00 Rp 2,175.00
0.005 Oh Kepala tukang kayu Rp 75,000.00 Rp 375.00
0.050 Oh Tukang kayu Rp 65,000.00 Rp 3,250.00
0.543 Oh Pekerja Rp 50,000.00 Rp 27,125.00
0.040 M3 BALOK ULIN Rp 1,800,000.00 Rp 72,000.00
1 1/4 x E.13 Rp 104,925.00 Rp 104,925.00
Untuk tanah biasa 1 1/4 x E.13 Rp 131,156.25 Rp 131,156.25
Untuk tanah keras 1 1/2 x E.13 Rp 157,387.50 Rp 157,387.50

4 Pasangan tongkat, sloof, gelegar dari kayu ulin per 1 M3 - BOW - F.1
1.100 M3 Balok kayu ulin Rp 1,800,000.00 Rp 1,980,000.00
1.000 Kg Paku ulin Rp 13,500.00 Rp 13,500.00
6.000 Oh Pekerja Rp 50,000.00 Rp 300,000.00
12.000 Oh Tukang kayu Rp 65,000.00 Rp 780,000.00
1.500 Oh Kepala tukang kayu Rp 75,000.00 Rp 112,500.00
0.250 Oh Mandor Rp 87,000.00 Rp 21,750.00
Rp 1,214,250.00 Rp 1,993,500.00 Rp 3,207,750.00

13 Pasangan kuzen pintu dan jendela kayu kapur/lembasung per 1 M3


1.200 M3 Balok kayu kapur/lembasung Rp 1,100,000.00 Rp 1,320,000.00
6.000 Oh Pekerja Rp 50,000.00 Rp 300,000.00
18.000 Oh Tukang kayu Rp 65,000.00 Rp 1,170,000.00
2.000 Oh Kepala tukang kayu Rp 75,000.00 Rp 150,000.00
0.300 Oh Mandor Rp 87,000.00 Rp 26,100.00
Rp 1,646,100.00 Rp 1,320,000.00 Rp 2,966,100.00

15 Pasangan jalusi mati kuzen kayu kapur/lembasung per 1 M2


0.060 M3 Papan kayu kapur/lembasung Rp 1,100,000.00 Rp 66,000.00
0.150 Kg Paku biasa 1/2" - 1" Rp 11,500.00 Rp 1,725.00
0.500 Oh Pekerja Rp 50,000.00 Rp 25,000.00
2.000 Oh Tukang kayu Rp 65,000.00 Rp 130,000.00
0.200 Oh Kepala tukang kayu Rp 75,000.00 Rp 15,000.00
0.025 Oh Mandor Rp 87,000.00 Rp 2,175.00
Rp 172,175.00 Rp 67,725.00 Rp 239,900.00

16 PAS plat buegel per BH - SK SNI T - 11 - 1993 - 03


1.000 bh plat buegel Rp 13,500.00 Rp 13,500.00
1.000 Kg Besi setrip Rp 1,000.00 Rp 1,000.00
0.080 Oh Pekerja Rp 50,000.00 Rp 4,000.00
0.090 Oh Tukang BESI Rp 65,000.00 Rp 5,850.00
0.055 Oh Kepala tukang Rp 75,000.00 Rp 4,125.00
0.030 Oh Mandor Rp 87,000.00 Rp 2,610.00
Rp 16,585.00 Rp 14,500.00 Rp 31,085.00

17 Pasang kuda-kuda, Konsul tarik, gording, nok (rangka) bahan kayu kapur/lembasung per M3 - SK SNI T - 11 - 1993 - 03
1.100 M3 Balok kayu kapur/lembasung Rp 1,100,000.00 Rp 1,210,000.00
2.200 Kg Paku Rp 11,500.00 Rp 25,300.00
1.940 Oh Pekerja Rp 50,000.00 Rp 97,000.00
5.800 Oh Tukang kayu Rp 65,000.00 Rp 377,000.00
0.580 Oh Kepala tukang kayu Rp 75,000.00 Rp 43,500.00
0.097 Oh Mandor Rp 87,000.00 Rp 8,439.00
Rp 525,939.00 Rp 1,235,300.00 Rp 1,761,239.00

19 PAS BOUT per BH - SK SNI T - 11 - 1993 - 03


1.000 bh BOUT DIA 12 Rp 4,000.00 Rp 4,000.00
1.000 Kg Besi setrip Rp 1,000.00 Rp 1,000.00
0.030 Oh Pekerja Rp 50,000.00 Rp 1,500.00
0.090 Oh Tukang BESI Rp 65,000.00 Rp 5,850.00
0.055 Oh Kepala tukang Rp 75,000.00 Rp 4,125.00
0.030 Oh Mandor Rp 87,000.00 Rp 2,610.00
Rp 14,085.00 Rp 5,000.00 Rp 19,085.00
Page 4 of 84

No. Uraian Pekerjaan Harga Satuan (Rp.) Upah Kerja (Rp.) Harga Bahan (Rp.) Jumlah (Rp.)

1 2 3 4 5 6

20 Pasangan kaso + reng genteng metal kayu meranti per 1 M2


0.012 M3 Kayu meranti Rp 900,000.00 Rp 10,800.00
0.150 Kg Paku biasa 2" - 5" Rp 11,500.00 Rp 1,725.00
0.100 Oh Pekerja Rp 50,000.00 Rp 5,000.00
0.100 Oh Tukang kayu Rp 65,000.00 Rp 6,500.00
0.010 Oh Kepala tukang kayu Rp 75,000.00 Rp 750.00
0.005 Oh Mandor Rp 87,000.00 Rp 435.00
Rp 12,685.00 Rp 12,525.00 Rp 25,210.00

22 Pasangan rangka langit-langit (1.00 x 1.00) m, kayu meranti per 1 M2


0.012 M3 Kayu meranti Rp 900,000.00 Rp 10,800.00
0.100 Kg Paku biasa 2" - 5" Rp 11,500.00 Rp 1,150.00
0.150 Oh Pekerja Rp 50,000.00 Rp 7,500.00
0.200 Oh Tukang kayu Rp 65,000.00 Rp 13,000.00
0.025 Oh Kepala tukang kayu Rp 75,000.00 Rp 1,875.00
0.075 Oh Mandor Rp 87,000.00 Rp 6,525.00
Rp 28,900.00 Rp 11,950.00 Rp 40,850.00

24 Pasangan Listplank uk. 2 x (2 x 20) cm, kayu kapur/lembasung/sejenisnya per 1 M1


0.009 M3 Papan kayu lembasung Rp 900,000.00 Rp 7,740.00
0.060 Kg Paku biasa 2" - 5" Rp 11,500.00 Rp 690.00
0.100 Oh Pekerja Rp 50,000.00 Rp 5,000.00
0.100 Oh Tukang kayu Rp 65,000.00 Rp 6,500.00
0.010 Oh Kepala tukang kayu Rp 75,000.00 Rp 750.00
0.050 Oh Mandor Rp 87,000.00 Rp 4,350.00
Rp 16,600.00 Rp 8,430.00 Rp 25,030.00

25 Pasangan List plafond - kayu profil


0.001 M1 Kayu berprofil Rp 900,000.00 Rp 1,260.00
0.015 Kg Paku biasa 2" - 5" Rp 11,500.00 Rp 172.50
0.025 Oh Pekerja Rp 50,000.00 Rp 1,250.00
0.025 Oh Tukang kayu Rp 65,000.00 Rp 1,625.00
0.010 Oh Kepala tukang kayu Rp 75,000.00 Rp 750.00
0.005 Oh Mandor Rp 87,000.00 Rp 435.00
Rp 4,060.00 Rp 1,432.50 Rp 5,492.50

26 Pasangan dinding/plafond dari papan kayu meranti per M2 - BOW - F.37.a


0.024 M3 Papan kayu meranti Rp 900,000.00 Rp 21,780.00
0.200 Kg Paku Rp 11,500.00 Rp 2,300.00
1.100 Oh Pekerja Rp 50,000.00 Rp 55,000.00
0.700 Oh Tukang kayu Rp 65,000.00 Rp 45,500.00
0.280 Oh Kepala tukang kayu Rp 75,000.00 Rp 21,000.00
0.054 Oh Mandor Rp 87,000.00 Rp 4,698.00
Rp 126,198.00 Rp 24,080.00 Rp 150,278.00

VIII. PEKERJAAN PENUTUP ATAP (SNI 03 - 3436 - 2002)

3 Menutup atap dengan genteng metal sakura roof per M2


1.623 Bh Genteng metal sakura roof Rp 32,000.00 Rp 51,948.80
1.000 Kg Paku Rp 600.00 Rp 600.00
0.200 Oh Pekerja Rp 50,000.00 Rp 10,000.00
0.100 Oh Tukang kayu Rp 65,000.00 Rp 6,500.00
0.010 Oh Kepala tukang kayu Rp 75,000.00 Rp 750.00
0.010 Oh Mandor Rp 87,000.00 Rp 870.00
Rp 18,120.00 Rp 52,548.80 Rp 70,668.80

4 Menutup bubungan pada genteng metal sakura roof per M1 - SK SNI T - 13 - 1993 - 03
2.000 Bh Bubungan metal sakura roof Rp 15,000.00 Rp 30,000.00
0.150 Kg Paku Rp 600.00 Rp 90.00
0.004 M3 Kayu meranti/sejenisnya Rp 900,000.00 Rp 3,600.00
0.200 Oh Pekerja Rp 50,000.00 Rp 10,000.00
0.100 Oh Tukang kayu Rp 65,000.00 Rp 6,500.00
0.010 Oh Kepala tukang kayu Rp 75,000.00 Rp 750.00
0.010 Oh Mandor Rp 87,000.00 Rp 870.00
Rp 18,120.00 Rp 33,690.00 Rp 51,810.00
Page 5 of 84

No. Uraian Pekerjaan Harga Satuan (Rp.) Upah Kerja (Rp.) Harga Bahan (Rp.) Jumlah (Rp.)

1 2 3 4 5 6

IX. PEKERJAAN PENGECATAN


1 Mendempul dan menggosok kayu per 1 M2
0.080 Kg Dempul jadi Rp 34,000.00 Rp 2,720.00
0.020 Kg Minyak cat Rp 24,000.00 Rp 480.00
0.010 Kg Batu apung Rp 15,000.00 Rp 150.00
0.040 Oh Pekerja Rp 50,000.00 Rp 2,000.00
0.040 Oh Tukang cat Rp 65,000.00 Rp 2,600.00
0.004 Oh Kepala tukang Rp 75,000.00 Rp 300.00
0.003 Oh Mandor Rp 87,000.00 Rp 217.50
Rp 5,117.50 Rp 3,350.00 Rp 8,467.50

3 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup per 1 M2
0.180 Kg Cat meni Rp 25,000.00 Rp 4,500.00
0.150 Kg Plamir Rp 34,000.00 Rp 5,100.00
0.150 Kg Cat dasar Rp 27,500.00 Rp 4,125.00
0.300 Kg Cat penutup 2 kali Rp 40,000.00 Rp 12,000.00
0.070 Oh Pekerja Rp 50,000.00 Rp 3,500.00
0.105 Oh Tukang cat Rp 65,000.00 Rp 6,825.00
0.004 Oh Kepala tukang Rp 75,000.00 Rp 300.00
0.003 Oh Mandor Rp 87,000.00 Rp 217.50
Rp 10,842.50 Rp 25,725.00 Rp 36,567.50

4 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) per 1 M2
0.100 Kg Plamir Rp 32,000.00 Rp 3,200.00
0.100 Kg Cat dasar Rp 27,500.00 Rp 2,750.00
0.200 Kg Cat penutup 2x cat catylac Rp 33,000.00 Rp 6,600.00
0.020 Oh Pekerja Rp 50,000.00 Rp 1,000.00
0.045 Oh Tukang cat Rp 65,000.00 Rp 2,925.00
0.006 Oh Kepala tukang Rp 75,000.00 Rp 472.50
0.003 Oh Mandor Rp 87,000.00 Rp 217.50
Rp 4,615.00 Rp 12,550.00 Rp 17,165.00

X. PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pasang keramik ukuran 30 x 30 cm per 1 M2
1.000 M2 Keramik 30 x 30 cm Rp 117,000.00 Rp 117,000.00
10.150 Kg Semen portland Rp 1,400.00 Rp 14,210.00
0.039 M3 Pasir pasang Rp 110,000.00 Rp 4,290.00
1.000 Kg Semen warna Rp 1,700.00 Rp 1,700.00
0.620 Oh Pekerja Rp 50,000.00 Rp 31,000.00
0.350 Oh Tukang batu Rp 65,000.00 Rp 22,750.00
0.035 Oh Kepala tukang Rp 75,000.00 Rp 2,625.00
0.030 Oh Mandor Rp 87,000.00 Rp 2,610.00
Rp 58,985.00 Rp 137,200.00 Rp 196,185.00

3 Pasang dinding keramik 20 x 20 cm warna per 1 M2


1.000 M2 Keramik 20 x 20 cm Rp 117,000.00 Rp 117,000.00
6.000 Kg Semen portland Rp 1,400.00 Rp 8,400.00
0.018 M3 Pasir pasang Rp 110,000.00 Rp 1,980.00
0.700 Kg Semen warna Rp 1,700.00 Rp 1,190.00
0.600 Oh Pekerja Rp 50,000.00 Rp 30,000.00
0.100 Oh Tukang batu Rp 65,000.00 Rp 6,500.00
0.045 Oh Kepala tukang Rp 75,000.00 Rp 3,375.00
0.030 Oh Mandor Rp 87,000.00 Rp 2,610.00
Rp 42,485.00 Rp 128,570.00 Rp 171,055.00

3 Pasang dinding keramik 10 x 15 cm warna per 1 M2


1.000 M2 Keramik 10 x 15 cm Rp 65,000.00 Rp 65,000.00
6.000 Kg Semen portland Rp 460.00 Rp 2,760.00
0.018 M3 Pasir pasang Rp 110,000.00 Rp 1,980.00
0.700 Kg Semen warna Rp 14,000.00 Rp 9,800.00
0.600 Oh Pekerja Rp 50,000.00 Rp 30,000.00
0.100 Oh Tukang batu Rp 65,000.00 Rp 6,500.00
0.045 Oh Kepala tukang Rp 75,000.00 Rp 3,375.00
0.030 Oh Mandor Rp 87,000.00 Rp 2,610.00
Rp 42,485.00 Rp 79,540.00 Rp 122,025.00
Page 6 of 84

No. Uraian Pekerjaan Harga Satuan (Rp.) Upah Kerja (Rp.) Harga Bahan (Rp.) Jumlah (Rp.)

1 2 3 4 5 6

XII. PEKERJAAN KUNCI DAN KACA


2 Pasang kunci tanam Standar 1 buah
1.000 Bh Kunci tanam kuda terbang Rp 285,000.00 Rp 285,000.00
0.010 Oh Pekerja Rp 50,000.00 Rp 500.00
0.500 Oh Tukang kayu Rp 65,000.00 Rp 32,500.00
0.010 Oh Kepala tukang Rp 75,000.00 Rp 750.00
0.005 Oh Mandor Rp 87,000.00 Rp 435.00
Rp 34,185.00 Rp 285,000.00 Rp 319,185.00

3 Pasang engsel pintu 1 buah


1.000 Bh Engsel pintu Rp 30,000.00 Rp 30,000.00
0.015 Oh Pekerja Rp 50,000.00 Rp 750.00
0.150 Oh Tukang kayu Rp 65,000.00 Rp 9,750.00
0.015 Oh Kepala tukang Rp 75,000.00 Rp 1,125.00
0.001 Oh Mandor Rp 87,000.00 Rp 65.25
Rp 11,690.25 Rp 30,000.00 Rp 41,690.25

4 Pasang engsel angin/jendela 1 buah


1.000 Bh Engsel angin Rp 20,000.00 Rp 20,000.00
0.020 Oh Pekerja Rp 50,000.00 Rp 1,000.00
0.200 Oh Tukang kayu Rp 65,000.00 Rp 13,000.00
0.020 Oh Kepala tukang Rp 75,000.00 Rp 1,500.00
0.010 Oh Mandor Rp 87,000.00 Rp 870.00
Rp 16,370.00 Rp 20,000.00 Rp 36,370.00

5 Pasang kait angin 1 buah


1.000 Bh Kait angin Rp 25,000.00 Rp 25,000.00
0.015 Oh Pekerja Rp 50,000.00 Rp 750.00
0.150 Oh Tukang kayu Rp 65,000.00 Rp 9,750.00
0.015 Oh Kepala tukang Rp 75,000.00 Rp 1,125.00
0.001 Oh Mandor Rp 87,000.00 Rp 65.25
Rp 11,690.25 Rp 25,000.00 Rp 36,690.25

6 Pasang grandle 1 buah


1.000 Bh grandle Rp 20,000.00 Rp 20,000.00
0.020 Oh Pekerja Rp 50,000.00 Rp 1,000.00
0.150 Oh Tukang kayu Rp 65,000.00 Rp 9,750.00
0.020 Oh Kepala tukang Rp 75,000.00 Rp 1,500.00
0.001 Oh Mandor Rp 87,000.00 Rp 87.00
Rp 12,337.00 Rp 20,000.00 Rp 32,337.00

7 Pasang handle, 1 buah


1.000 Bh handle Rp 25,000.00 Rp 25,000.00
0.020 Oh Pekerja Rp 50,000.00 Rp 1,000.00
0.200 Oh Tukang kayu Rp 65,000.00 Rp 13,000.00
0.020 Oh Kepala tukang Rp 75,000.00 Rp 1,500.00
0.003 Oh Mandor Rp 87,000.00 Rp 217.50
Rp 15,717.50 Rp 25,000.00 Rp 40,717.50
Page 7 of 84

No. Uraian Pekerjaan Harga Satuan (Rp.) Upah Kerja (Rp.) Harga Bahan (Rp.) Jumlah (Rp.)

1 2 3 4 5 6

9 Pasang kaca rayben tebal 5 mm per 1 M2


1.100 M2 Kaca rayben Rp 135,500.00 Rp 149,050.00
0.015 Oh Pekerja Rp 50,000.00 Rp 750.00
0.150 Oh Tukang kayu Rp 65,000.00 Rp 9,750.00
0.015 Oh Kepala tukang Rp 75,000.00 Rp 1,125.00
0.001 Oh Mandor Rp 87,000.00 Rp 65.25
Rp 11,690.25 Rp 149,050.00 Rp 160,740.25

XIII. PEKERJAAN BESI DAN ALUMINIUM


3 Pasang jendela nako 1 bh
1.100 M2 Jendela nako Rp 181,000.00 Rp 199,100.00
10.000 bh Paku biasa 1/2" - 1" atau skrup Rp 1,500.00 Rp 15,000.00
0.025 M2 Besi strip Rp 1,000.00 Rp 25.00
0.200 Oh Pekerja Rp 50,000.00 Rp 10,000.00
0.200 Oh Tukang kayu Rp 65,000.00 Rp 13,000.00
0.020 Oh Kepala tukang Rp 75,000.00 Rp 1,500.00
0.001 Oh Mandor Rp 87,000.00 Rp 87.00
Rp 24,587.00 Rp 214,125.00 Rp 238,712.00

7 Pasang pipa PVC 1/2" per M1


0.250 Ljr pipa Rp 35,000.00 Rp 8,750.00
1.000 bh elbouw Rp 12,500.00 Rp 12,500.00
0.100 Oh Pekerja Rp 50,000.00 Rp 5,000.00
0.075 Oh Tukang besi Rp 65,000.00 Rp 4,875.00
0.025 Oh Kepala tukang Rp 75,000.00 Rp 1,875.00
0.025 Oh Mandor Rp 87,000.00 Rp 2,175.00
Rp 13,925.00 Rp 21,250.00 Rp 35,175.00

8 Pasang pipa PVC 1" per M1


0.250 Ljr pipa Rp 48,000.00 Rp 12,000.00
1.500 bh elbouw Rp 9,500.00 Rp 14,250.00
0.100 Oh Pekerja Rp 50,000.00 Rp 5,000.00
0.075 Oh Tukang besi Rp 65,000.00 Rp 4,875.00
0.025 Oh Kepala tukang Rp 75,000.00 Rp 1,875.00
0.025 Oh Mandor Rp 87,000.00 Rp 2,175.00
Rp 13,925.00 Rp 26,250.00 Rp 40,175.00

9 Pasang pipa PVC 2" per M1


0.250 Ljr pipa Rp 103,000.00 Rp 25,750.00
1.000 bh elbouw Rp 13,500.00 Rp 13,500.00
0.100 Oh Pekerja Rp 50,000.00 Rp 5,000.00
0.075 Oh Tukang besi Rp 65,000.00 Rp 4,875.00
0.025 Oh Kepala tukang Rp 75,000.00 Rp 1,875.00
0.025 Oh Mandor Rp 87,000.00 Rp 2,175.00
Rp 13,925.00 Rp 39,250.00 Rp 53,175.00

10 Pasang pipa PVC 4" per M1


0.250 Ljr pipa Rp 257,000.00 Rp 64,250.00
1.000 bh elbouw Rp 24,000.00 Rp 24,000.00
0.100 Oh Pekerja Rp 50,000.00 Rp 5,000.00
0.075 Oh Tukang besi Rp 65,000.00 Rp 4,875.00
0.025 Oh Kepala tukang Rp 75,000.00 Rp 1,875.00
0.025 Oh Mandor Rp 87,000.00 Rp 2,175.00
Rp 13,925.00 Rp 88,250.00 Rp 102,175.00

11 Pasang kran air 3/4" per bh1


1.000 bh kran air Rp 24,000.00 Rp 24,000.00
0.025 Oh Pekerja Rp 50,000.00 Rp 1,250.00
0.025 Oh Tukang besi Rp 65,000.00 Rp 1,625.00
0.015 Oh Kepala tukang Rp 75,000.00 Rp 1,125.00
0.015 Oh Mandor Rp 87,000.00 Rp 1,305.00
Rp 5,305.00 Rp 24,000.00 Rp 29,305.00

12 Pasang floor drain per bh1


1.000 bh floor drain Rp 42,500.00 Rp 42,500.00
0.025 Oh Pekerja Rp 50,000.00 Rp 1,250.00
0.025 Oh Tukang besi Rp 65,000.00 Rp 1,625.00
0.015 Oh Kepala tukang Rp 75,000.00 Rp 1,125.00
0.010 Oh Mandor Rp 87,000.00 Rp 870.00
Rp 4,870.00 Rp 42,500.00 Rp 47,370.00
Page 8 of 84

No. Uraian Pekerjaan Harga Satuan (Rp.) Upah Kerja (Rp.) Harga Bahan (Rp.) Jumlah (Rp.)

1 2 3 4 5 6

13 Pasang wastafel per bh1


1.000 bh washtafel Rp 475,000.00 Rp 475,000.00
0.075 Oh Pekerja Rp 50,000.00 Rp 3,750.00
0.045 Oh Tukang besi Rp 65,000.00 Rp 2,925.00
0.035 Oh Kepala tukang Rp 75,000.00 Rp 2,625.00
0.030 Oh Mandor Rp 87,000.00 Rp 2,610.00
Rp 11,910.00 Rp 475,000.00 Rp 486,910.00

14 Pasang closed per bh1


1.000 bh kloset Rp 155,000.00 Rp 155,000.00
0.595 Oh Pekerja Rp 50,000.00 Rp 29,750.00
0.055 Oh Tukang besi Rp 65,000.00 Rp 3,575.00
0.025 Oh Kepala tukang Rp 75,000.00 Rp 1,875.00
0.015 Oh Mandor Rp 87,000.00 Rp 1,305.00
Rp 36,505.00 Rp 155,000.00 Rp 191,505.00

15 Pasang pipa galvanis 2" per M1


0.250 Ljr pipa galvanis Rp 576,500.00 Rp 144,125.00
0.100 Oh Pekerja Rp 50,000.00 Rp 5,000.00
0.075 Oh Tukang besi Rp 65,000.00 Rp 4,875.00
0.025 Oh Kepala tukang Rp 75,000.00 Rp 1,875.00
0.025 Oh Mandor Rp 50,000.00 Rp 1,250.00
Rp 13,000.00 Rp 144,125.00 Rp 157,125.00

16 Pasang pipa stainless steel 2" per M1


0.250 Ljr pipa Stanles steel Rp 1,000,000.00 Rp 250,000.00
0.100 Oh Pekerja Rp 50,000.00 Rp 5,000.00
0.075 Oh Tukang besi Rp 65,000.00 Rp 4,875.00
0.025 Oh Kepala tukang Rp 75,000.00 Rp 1,875.00
0.025 Oh Mandor Rp 50,000.00 Rp 1,250.00
Rp 13,000.00 Rp 250,000.00 Rp 263,000.00
DAFTAR SATUAN BAHAN DAN MATERIAL
TAHUN ANGGARAN 2013

NO URAIAN KODE SATUAN HARGA SATUAN KET.


1 2 3 4 5 6

1 Batu Gunung M.101 M3 150,000.00


2 Kerikil Sungai M.012 M3 94,500.00
3 Batu Kali Bulat M.013 M3 266,000.00
4 Batu Pecah 15 - 20 Cm ( Ex. Malinau ) M.020 M3 325,000.00
5 Batu Pecah 5 - 7 Cm ( Ex. Malinau ) M.022 M3 325,000.00
6 Batu Pecah 3 - 5 Cm ( Ex. Malinau ) M.023 M3 325,000.00
7 Batu Pecah 2 - 3 Cm ( Ex. Malinau ) M.024 M3 325,000.00
8 Batu Pecah 1 - 2 Cm ( Ex. Malinau ) M.025 M3 325,000.00
9 Batu Pecah 0.5 - 1 Cm (( Ex. Malinau ) M.026 M3 350,000.00
10 Batu Pecah 15 - 20 Cm ( Ex. Sekatak ) M.020 M3 360,000.00
11 Batu Pecah 5 - 7 Cm ( Ex. Sekatak ) M.022 M3 360,000.00
12 Batu Pecah 3 - 5 Cm ( Ex. Sekatak ) M.023 M3 360,000.00
13 Batu Pecah 2 - 3 Cm ( Ex. Sekatak ) M.024 M3 360,000.00
14 Batu Pecah 1 - 2 Cm ( Ex. Sekatak ) M.025 M3 360,000.00
15 Batu Pecah 0.5 - 1 Cm ( Ex. Sekatak ) M.026 M3 360,000.00
16 Batu Bata Bh 1,500.00
17 Abu Batu ( Ex. Malinau ) M.081 M3 325,000.00
18 Pasir Urug M.040 M3 110,000.00
19 Pasir Pasang M.043 M3 120,000.00
20 Sirtu / Kerikil Tak Disaring M.042 M3 200,000.00
21 Timbunan Pilihan M.050 M3 94,500.00
22 Tanah Urug M.051 M3 15,000.00
23 Aspal Bitumen M.061 Kg 12,700.00
24 Aspal Buton M.062 Ltr 10,200.00
25 Minyak Flux M.063 Ltr 8,452.50
26 Minyak Aspal M.064 Ltr 13,282.50
27 Minyak Tanah M.065 Ltr 5,775.00
28 Kayu Bakar M.070 M3 241,500.00
29 Semen / PC M.080 Sak 110,000.00
30 Semen Putih Sak 89,375.00
31 Cat Jembatan M.090 Kg 33,206.25
32 Kawat Bronjong M.162 Kg 27,772.50
33 Baut Baja M.163 Kg 21,131.25
34 Besi Galvanis M.164 Kg 25,000.00
35 Besi Beton Kg 14,500.00
36 Alat - alat bantu M.170 Unit 34,500.00
37 Paku Biasa M.166 Kg 16,800.00
38 Baja Profil M.165 Kg 30,187.50
39 Baja polos M.167 Kg 13,282.50
40 Kawat Bindrat M.168 Kg 27,772.50
41 Kayu untuk Perancah M.180 M3 882,050.00
42 Kayu untuk kontruksi Jembatan M.181 M3 2,728,950.00
NO URAIAN KODE SATUAN HARGA SATUAN KET.
1 2 3 4 5 6

43 Kayu Bulat ( Kayu Laut ) Standart Bh 27,168.75


44 Tear Kg 20,527.50
45 Minyak Solar Ltr 4,500.00
46 Minyak Premium Ltr 4,500.00
47 Minyak Pelumas Ltr 44,008.97
48 Besi Klam U Kg 45,885.00
49 Baut Ǿ 1/2 Inchi - 15 Cm Kg 24,150.00
50 Baut Ǿ 3/8 Inchi - 15 Cm Kg 24,150.00
51 Balok Ulin 5 / 10 cm M3 3,500,000.00
52 Balok Ulin 10 / 10 cm M3 3,500,000.00
53 Balok Ulin 12 / 12 cm M3 3,500,000.00
54 Balok Ulin 15 / 15 cm M3 3,500,000.00
55 Balok Ulin 15 / 15 - 600 cm M3 3,500,000.00
56 Balok Ulin 20 / 20 cm M3 3,500,000.00
57 Papan Ulin Tebal 2.5 / 25 cm M3 4,800,000.00
58 Papan Ulin Tebal 5 / 25 cm M3 4,800,000.00
59 Papan Ulin Tebal 9 / 25 cm M3 4,800,000.00
60 Paku Ulin Kg 20,000.00
61 Conblok / Beton Cetak / Paving stone Bh 6,037.50
62 Kayu Laut dia 15 Cm Btg 27,168.75
63 Bata Merah Bh 1,500.00
64 Cat Atap Kg 33,206.25
65 Cat Air Kg 39,847.50
66 Cat Kilap Kg 48,300.00
67 Dempul / Plamir Kg 41,055.00
68 Papan Kayu Meranti/Sejenis M3 1,500,000.00
69 Balok Kayu Meranti/sejenis M3 1,500,000.00
70 Papan Kayu Merang/sejenis M3 2,500,000.00
71 Balok Kayu Merang/sejenis M3 2,500,000.00
72 Papan Kayu Ulin M3 4,800,000.00
73 Balok Kayu Kapur M3 1,800,000.00
74 Papan Kayu Kapur M3 1,800,000.00
75 Kertas Amplas Lbr 4,830.00
76 Cap Menie Kg 30,187.50
77 Minyak Cat Ltr 28,980.00
78 Paku Seng Kg 25,000.00
79 Paku Sirap Kg 27,168.75
80 Paku Sekrup Bh 1,811.25
81 Playwood 4 mm Lbr 65,000.00
82 Seng Gelombang BJLS 20 Lbr 47,000.00
83 Seng Plat BJLS 20 M1 16,000.00
84 Seng Gelombang BJLS 30 Lbr 47,000.00
85 Seng Plat BJLS 30 M1 16,000.00
86 Kaca Bening 5 mm M2 109,278.75
87 Kloset Jongkok Bh 187,162.50
88 Engsel Set 33,000.00
89 Kunci Tanam Bh 362,250.00
90 Grendel Bh 35,000.00
NO URAIAN KODE SATUAN HARGA SATUAN KET.
1 2 3 4 5 6

91 Kran Air Bh 45,000.00


92 Hak Angin Bh 20,000.00
93 Pipa PVC Ø 2' Ljr 42,000.00
94 Pipa PVC Ø 2' Ljr 185,466.00
95 Pipa PVC Ø 2.5' Ljr -
96 Pipa PVC Ø 4' Ljr 185,466.00
97 Pipa Galvanis D = 1/2" Ljr 245,726.25
98 Pipa Galvanis D = 1" Ljr 368,287.50
99 Pipa Galvanis D = 1.1/2" Ljr 532,507.50
100 Pipa Galvanis D = 2" Ljr 696,123.75
101 Pipa Galvanis D = 3" Ljr 859,740.00
102 Pipa Galvanis D = 4" Ljr 1,023,356.25
103 Elbouw Galvanis D = 1/2" Bh 10,263.75
104 Tee Galvanis D = 1/2" Bh 24,150.00
105 Tee PVCD = 2" Bh 16,301.25
99 Tee PVCD = 4" Bh 28,980.00
100 Tee PVCD = 1/2" Ljr 15,093.75
101 Tee PVCD = 1" Ljr 11,471.25
102 Tee PVCD = 1.1/2" Ljr 13,886.25
103 Tee PVCD = 2" Ljr 16,301.25
104 Tee PVCD = 2.1/2" Ljr 17,508.75
105 Tee PVCD = 3" Ljr 18,112.50
106 Tee PVCD = 4" Ljr 28,980.00
107 Pipa Talang D = 4" M1 27,500.00
108 Elbouw PVCD = 1/2" Bh 15,093.75
109 Elbouw PVCD = 1" Bh 11,471.25
110 Elbouw PVCD = 1.1/2" Bh 13,886.25
111 Elbouw PVCD = 2" Bh 16,301.25
112 Elbouw PVCD = 2.1/2" Bh 17,508.75
113 Elbouw PVCD = 3" Bh 18,112.50
114 Elbouw PVCD = 4" Bh 28,980.00
115 Profil Tank Fiber Glass Kap 1.100 Ltr Unit 2,205,000.00
116 Talang Air PVC Ljr 110,000.00
117 Baut Pangkal Kuda - kuda Bh 24,150.00
118 Palt U 6,50-400 Pengikat Kuda-kuda Bh 16,301.25
119 Tegel Keramik 30 x 30 M2 Ktk 85,000.00
120 Tegel Mozaik Ktk 115,920.00
121 Batu Batako M2 33,000.00
122 Besi 110 Kg Kg 14,500.00
123 Papan Perancah M3 879,060.00
124 Plamur Tembok klg 38,640.00
125 Plamur Kayu klg 41,055.00
126 Pompa Air Fortable M3 671,370.00
127 Air Bersih M3 37,500.00
128 Kaca Nako Plos T.5 mm Bh 204,671.25
129 Kaca Nako Reben T.5 mm Bh 218,557.50
130 Lem Kayu Kg 72,450.00
131 Texwood Lbr 99,750.00
132 Plafon Nitobo Lbr 79,695.00
NO URAIAN KODE SATUAN HARGA SATUAN KET.
1 2 3 4 5 6

133 Genteng Beton Bh 13,000.00


134 Genteng Metal Bh 39,200.00
135 Paku Sumbat Bh 724.50
NO URAIAN KODE SATUAN HARGA SATUAN KET.
1 2 3 4 5 6

136 Alat Bantu Ls 36,000.00


137 Socket Bh 14,490.00
138 Paku Genteng Bh 1,207.50
139 Cangkul Bh 60,000.00
140 Sekop Bh 78,750.00
141 Gerobak Bh 425,000.00
142 Kawat Duri Kg 26,450.00
143 Besi Strip Kg 43,700.00
144 Kaca Polos M2 109,278.75
145 Puzzdith - 100 xR Ltr 25,000.00
146 Genteng Metal Sakura Roof Bh 39,200.00
147 Keramik 20 X 20 M2 Ktk 85,000.00
148 Bubungan genteng Metal Sakura Roof Bh 45,000.00
149 Kaca Ray Ban (40%) Tebal 5 mm M2 163,616.25
150 Gembok Bh 30,791.25
151 Minyak Pelumas Ltr 44,008.97
DAFTAR ANALISA
HARGA SATUAN DAERAH KABUPATEN TANA TIDUNG
TAHUN ANGGARAN 2021

No Uraian Pekerjaan Harga Satuan (Rp.) Upah Kerja (Rp.) Harga Bahan (Rp.) Jumlah (Rp.)

1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank per M1
0.012 M3 Balok meranti 5/7 Rp 3,850,000.00 Rp 46,200.00
0.020 Kg Paku biasa 2" - 5" Rp 30,000.00 Rp 600.00
0.007 M3 Papan meranti 3/20 Rp 3,850,000.00 Rp 26,950.00
0.100 Oh Tukang kayu Rp 150,000.00 Rp 15,000.00
0.100 Oh Pekerja Rp 130,000.00 Rp 13,000.00
0.010 Oh Kepala tukang Rp 160,000.00 Rp 1,600.00
0.005 Oh Mandor Rp 180,000.00 Rp 900.00
Rp 30,500.00 Rp 73,750.00 Rp 104,250.00
2 Pembuatan gudang semen dan alat-alat per 1 M2
1.700 Btg Kayu perancah 4 m Rp 27,168.75 Rp 46,186.88
0.210 M3 Kayu meranti 5/7 Rp 3,850,000.00 Rp 808,500.00
0.300 Kg Paku biasa Rp 30,000.00 Rp 9,000.00
10.500 Kg Semen Portland Rp 2,400.00 Rp 25,200.00
0.030 M3 Pasir Pasang Rp 210,000.00 Rp 6,300.00
0.050 M3 Batu Gunung Rp 450,000.00 Rp 22,500.00
1.500 Lbr Seng gelombang BJLS 30 Rp 47,000.00 Rp 70,500.00
2.000 Oh Tukang kayu Rp 150,000.00 Rp 300,000.00
1.000 Oh Pekerja Rp 130,000.00 Rp 130,000.00
0.200 Oh Kepala tukang Rp 160,000.00 Rp 32,000.00
0.050 Oh Mandor Rp 180,000.00 Rp 9,000.00
Rp 471,000.00 Rp 988,186.88 Rp 1,459,186.88
3 Membersihkan lapangan dan perataan per 1 M2
0.100 Oh Pekerja Rp 130,000.00 Rp 13,000.00
0.050 Oh Mandor Rp 180,000.00 Rp 9,000.00
Rp 22,000.00 Rp 22,000.00

1 Galian tanah biasa sedalam 1 meter per 1 M3


0.400 Oh Pekerja Rp 130,000.00 Rp 52,000.00
0.040 Oh Mandor Rp 180,000.00 Rp 7,200.00
Rp 59,200.00 Rp 59,200.00
2 Urugan kembali per 1 M3
0.192 Oh Pekerja Rp 130,000.00 Rp 24,960.00
0.019 Oh Mandor Rp 180,000.00 Rp 3,420.00
Rp 28,380.00 Rp 28,380.00
3 Urugan tanah per 1 M3
1.200 M3 Tanah Urug Rp 55,000.00 Rp 66,000.00
0.250 Oh Pekerja Rp 130,000.00 Rp 32,500.00
0.025 Oh Mandor Rp 180,000.00 Rp 4,500.00
Rp 37,000.00 Rp 66,000.00 Rp 103,000.00
4 Pemadatan tanah per 1 M3
0.500 Oh Pekerja Rp 130,000.00 Rp 65,000.00
0.050 Oh Mandor Rp 180,000.00 Rp 9,000.00
Rp 74,000.00 Rp 74,000.00
1 Urugan pasir per 1 M3
1.200 M3 Pasir urug Rp 650,000.00 Rp 780,000.00
0.300 Oh Pekerja Rp 130,000.00 Rp 39,000.00
0.010 Oh Mandor Rp 180,000.00 Rp 1,800.00
Rp 40,800.00 Rp 780,000.00 Rp 820,800.00
2 Urugan tanah per 1 M3
1.200 M3 Tanah Urug Rp 55,000.00 Rp 66,000.00
0.250 Oh Pekerja Rp 130,000.00 Rp 32,500.00
0.025 Oh Mandor Rp 180,000.00 Rp 4,500.00
Rp 37,000.00 Rp 66,000.00 Rp 103,000.00
3 Urugan sirtu per 1 M3
1.200 M3 Sirtu Rp 180,000.00 Rp 216,000.00
0.250 Oh Pekerja Rp 130,000.00 Rp 32,500.00
0.025 Oh Mandor Rp 180,000.00 Rp 4,500.00
Rp 37,000.00 Rp 216,000.00 Rp 253,000.00
3 Pasangan Bekisting per M2
0.040 M3 Kayu Bekisting Rp 2,700,000.00 Rp 108,000.00
0.300 Kg Paku Biasa Rp 30,000.00 Rp 9,000.00
0.100 Ltr Minyak bekisting Rp 17,500.00 Rp 1,750.00
0.520 Oh Pekerja Rp 130,000.00 Rp 67,600.00
0.260 Oh Tukang batu Rp 150,000.00 Rp 39,000.00
0.026 Oh Kepala tukang Rp 160,000.00 Rp 4,160.00
0.026 Oh Mandor Rp 180,000.00 Rp 4,680.00
Rp 117,190.00 Rp 117,000.00 Rp 234,190.00
No Uraian Pekerjaan Harga Satuan (Rp.) Upah Kerja (Rp.) Harga Bahan (Rp.) Jumlah (Rp.)

1 2 3 4 5 6
4 Membuat beton mutu K 125 per 1 m3
276.000 M3 Semen Portland @50 kg Rp 2,400.00 Rp 662,400.00
0.518 Kg Pasir Beton Rp 210,000.00 Rp 108,780.00
0.698 M3 Batu Pecah 2-3 cm Rp 700,000.00 Rp 488,600.00
215.000 Ltr Air Rp 200.00 Rp 43,000.00
1.650 Oh Pekerja Rp 130,000.00 Rp 214,500.00
0.275 Oh Tukang batu Rp 150,000.00 Rp 41,250.00
0.028 Oh Kepala tukang Rp 160,000.00 Rp 4,480.00
0.083 Oh Mandor Rp 180,000.00 Rp 14,940.00
Rp 318,170.00 Rp 1,259,780.00 Rp 1,577,950.00
III. PEKERJAAN PONDASI (SNI 03-2836-2002)
1 Pasangan pondasi batu kali 1 Pc : 2 Ps per per 1 M3
1.100 M3 Batu Kali/batu gunung Rp 450,000.00 Rp 495,000.00
267.000 Kg Semen Portland Rp 2,400.00 Rp 640,800.00
0.427 M3 Pasir pasang Rp 210,000.00 Rp 89,670.00
1.500 Oh Pekerja Rp 130,000.00 Rp 195,000.00
0.600 Oh Tukang batu Rp 150,000.00 Rp 90,000.00
0.060 Oh Kepala tukang Rp 160,000.00 Rp 9,600.00
0.075 Oh Mandor Rp 180,000.00 Rp 13,500.00
Rp 308,100.00 Rp 1,225,470.00 Rp 1,533,570.00
2 Pasangan pondasi batu kali 1 Pc : 4 Ps per per 1 M3
1.100 M3 Batu Kali/batu gunung Rp 450,000.00 Rp 495,000.00
163.000 Kg Semen Portland Rp 2,400.00 Rp 391,200.00
0.520 M3 Pasir pasang Rp 210,000.00 Rp 109,200.00
1.500 Oh Pekerja Rp 130,000.00 Rp 195,000.00
0.600 Oh Tukang batu Rp 150,000.00 Rp 90,000.00
0.060 Oh Kepala tukang Rp 160,000.00 Rp 9,600.00
0.075 Oh Mandor Rp 180,000.00 Rp 13,500.00
Rp 308,100.00 Rp 995,400.00 Rp 1,303,500.00
3 Pasangan batu kosong/Aanstampeng per 1 M3
1.200 M3 Batu Kali/Gunung 15/20 cm Rp 450,000.00 Rp 540,000.00
0.300 M3 Pasir urug Rp 210,000.00 Rp 63,000.00
0.780 Oh Pekerja Rp 130,000.00 Rp 101,400.00
0.390 Oh Tukang batu Rp 150,000.00 Rp 58,500.00
0.039 Oh Kepala tukang Rp 160,000.00 Rp 6,240.00
0.039 Oh Mandor Rp 180,000.00 Rp 7,020.00
Rp 173,160.00 Rp 603,000.00 Rp 776,160.00
IV. PEKERJAAN KAYU
1 Sebuah tiang pancang dicincin dan dilancipkan - BOW - E.1
0.005 Oh Mandor Rp 180,000.00 Rp 900.00
0.025 Oh Kepala tukang kayu Rp 160,000.00 Rp 4,000.00
0.250 Oh Tukang kayu Rp 150,000.00 Rp 37,500.00
0.100 Oh Pekerja Rp 130,000.00 Rp 13,000.00
Rp 55,400.00 Rp 55,400.00
2 Membuat pen pada tiang dan lubang pada balok pemikul tiap-tiap pasangan pen dan lubang - BOW - E.4
0.600 Oh Tukang kayu Rp 150,000.00 Rp 90,000.00
0.060 Oh Kepala tukang kayu Rp 160,000.00 Rp 9,600.00
Rp 99,600.00 Rp 99,600.00
3 Memancang tiang pada tanah lunak per M1 - BOW - F.1
0.043 Oh Mandor Rp 180,000.00 Rp 7,740.00
0.004 Oh Kepala tukang kayu Rp 160,000.00 Rp 640.00
0.040 Oh Tukang kayu Rp 150,000.00 Rp 6,000.00
1.800 Oh Pekerja Rp 130,000.00 Rp 234,000.00
1 1/4 x E.13 Rp 248,380.00 Rp 248,380.00
Untuk tanah biasa 1 1/4 x E.13 Rp 310,475.00 Rp 310,475.00
Untuk tanah keras 1 1/2 x E.13 Rp 372,570.00 Rp 372,570.00
4 1 Ttk memancang tiang pancang kayu ulin 10/10 - 2 m
0.020 M3 Kayu ulin 10/10 - 2 m Rp 6,000,000.00 Rp 120,000.00
0.043 Oh Mandor Rp 180,000.00 Rp 7,740.00
0.004 Oh Kepala tukang kayu Rp 160,000.00 Rp 640.00
0.040 Oh Tukang kayu Rp 150,000.00 Rp 6,000.00
1.800 Oh Pekerja Rp 130,000.00 Rp 234,000.00
0.060 Ls Alat bantu Rp 36,000.00 Rp 2,160.00
Rp 248,380.00 Rp 122,160.00 Rp 370,540.00
5 Pasangan sunduk, kalang dari kayu ulin per M3 - BOW - F.1
1.200 M3 Balok kayu ulin Rp 6,000,000.00 Rp 7,200,000.00
6.000 Oh Pekerja Rp 130,000.00 Rp 780,000.00
18.000 Oh Tukang kayu Rp 150,000.00 Rp 2,700,000.00
2.000 Oh Kepala tukang kayu Rp 160,000.00 Rp 320,000.00
0.300 Oh Mandor Rp 180,000.00 Rp 54,000.00
Rp 3,854,000.00 Rp 7,200,000.00 Rp 11,054,000.00
No Uraian Pekerjaan Harga Satuan (Rp.) Upah Kerja (Rp.) Harga Bahan (Rp.) Jumlah (Rp.)

1 2 3 4 5 6
V. PEKERJAAN BETON
1 Pasangan batu bata dengan 1 Pc : 4 Ps per M3 - BOW - G.33.b + G.27
450.000 Bh Batu bata Rp 5,000.00 Rp 2,250,000.00
2.533 Zak Semen PC Rp 120,000.00 Rp 303,960.00
0.406 M3 Pasir pasang Rp 210,000.00 Rp 85,260.00
0.225 Oh Mandor Rp 180,000.00 Rp 40,500.00
0.150 Oh Kepala tukang batu Rp 160,000.00 Rp 24,000.00
1.500 Oh Tukang batu Rp 150,000.00 Rp 225,000.00
4.500 Oh Pekerja Rp 130,000.00 Rp 585,000.00
Rp 874,500.00 Rp 2,639,220.00 Rp 3,513,720.00
2 Membuat beton tumbuk/rabat 1 Pc : 3 Ps : 5 Kr per 1 M3 SNI 2001
218.000 Kg Semen Portland Rp 2,400.00 Rp 523,200.00
0.520 M3 Pasir beton Rp 210,000.00 Rp 109,200.00
0.870 M3 Kerikil Sungai Rp 94,500.00 Rp 82,215.00
1.650 Oh Pekerja Rp 130,000.00 Rp 214,500.00
0.250 Oh Tukang batu Rp 150,000.00 Rp 37,500.00
0.025 Oh Kepala tukang Rp 160,000.00 Rp 4,000.00
0.080 Oh Mandor Rp 180,000.00 Rp 14,400.00
Rp 270,400.00 Rp 714,615.00 Rp 985,015.00
Membuat beton Dengan Mutu K 125 Per M³
250.000 Kg Semen Portland Rp 2,400.00 Rp 600,000.00
0.550 M3 Pasir Pasang Rp 210,000.00 Rp 115,500.00
0.750 M³ Kerikil Cor Beton Rp 292,215.00 Rp 219,161.25
0.855 Oh Mandor Rp 180,000.00 Rp 153,900.00
1.085 Oh Kepala tukang batu Rp 160,000.00 Rp 173,600.00
1.550 Oh Tukang batu Rp 150,000.00 Rp 232,500.00
2.750 Oh Pekerja Rp 130,000.00 Rp 357,500.00
1.00 Unit Alat Batu Rp 34,500.00 Rp 34,500.00
Rp 952,000.00 Rp 934,661.25 Rp 1,886,661.25
Pasang Bekisting Untuk Pondasi Per 1 M²
0.029 M3 Kayu Bekisting Rp 1,650,000.00 Rp 47,850.00
0.300 Kg Paku Biasa Rp 30,000.00 Rp 9,000.00
0.300 M3 Pekerja Rp 130,000.00 Rp 39,000.00
0.260 Oh Tukang batu Rp 150,000.00 Rp 39,000.00
0.027 Oh Kepala tukang batu Rp 160,000.00 Rp 4,320.00
0.015 Oh Mandor Rp 180,000.00 Rp 2,700.00
Rp 85,020.00 Rp 56,850.00 Rp 141,870.00
1 M² Bongkar Bekisting = 1/5 x Upah
Pasang Bekisting Rp 28,374.00
Rp 170,244.00
3 Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr per 1 M3 SNI 2001
336.000 Kg Semen Portland Rp 2,400.00 Rp 806,400.00
0.520 M3 Pasir beton Rp 210,000.00 Rp 109,200.00
0.780 M3 Kerikil Sungai Rp 94,500.00 Rp 73,710.00
1.650 Oh Pekerja Rp 130,000.00 Rp 214,500.00
0.250 Oh Tukang batu Rp 150,000.00 Rp 37,500.00
0.025 Oh Kepala tukang Rp 160,000.00 Rp 4,000.00
0.080 Oh Mandor Rp 180,000.00 Rp 14,400.00
Rp 270,400.00 Rp 989,310.00 Rp 1,259,710.00
DAFTAR SATUAN BAHAN DAN MATERIAL
TAHUN ANGGARAN 2021

NO URAIAN KODE SATUAN HARGA SATUAN KET.


1 2 3 4 5 6

1 Batu Gunung M.101 M3 450,000.00


2 Batu Pecah 5 - 7 Cm ( Ex. Sekatak ) M.022 M3 700,000.00
3 Batu Pecah 3 - 5 Cm ( Ex. Sekatak ) M.023 M3 700,000.00
4 Batu Pecah 2 - 3 Cm (Ex Sekatak) M3 700,000.00
5 Bataco Bh 5,000.00
6 Abu Batu ( Ex. Malinau ) M3 325,000.00
7 Pasir Batu ( Sirtu ) M3 650,000.00
8 Pasir Beton / Pasang M3 210,000.00
9 Tanah Urug M3 55,000.00
10 Tanah Pilihan M3 76,000.00
11 Semen / PC Zak 120,000.00
12 Paku Biasa Kg 30,000.00
13 Papan Meranti M3 2,700,000.00
13 Balok Meranti M3 2,700,000.00
14 Kayu untuk Perancah (Bekisting) M3 1,650,000.00
15 Minyak Cat Ltr 44,000.00
16 Balok Ulin 5 / 10 cm M3 6,000,000.00
17 Balok Ulin 10 / 10 cm M3 6,000,000.00
18 Balok Ulin 12 / 12 cm M3 6,000,000.00
19 Balok Ulin 15 / 15 cm M3 6,000,000.00
20 Balok Ulin 15 / 15 - 600 cm M3 6,000,000.00
21 Balok Ulin 20 / 20 cm M3 6,000,000.00
22 Paku Ulin Kg 30,000.00
23 Papan Kayu Bengkirai M3 3,850,000.00
24 Balok Kayu Bengkirai M3 3,850,000.00
25 Besi Ø 8 mm Btg 95,000.00
24 Besi Ø 10 mm Btg 110,000.00
25 Besi Ø 12 mm Btg 150,000.00
26 Besi Ø 16 mm Btg 250,000.00
27 Kawat Bindrat kg 30,000.00
28 Pipa PVC Ø 4' Ljr 165,000.00
29 Elbouw PVC Ø 4" Bh 55,500.00
30 Kaca 5 mm m2 250,000.00
31 Backlayer Bungkus 50,000.00
32 Kuas Bh 15,000.00
33 Cat Kg 80,000.00
34 Triplek / Polywood Lbr 95,000.00
35 Spandek Lbr 650,000.00
DAFTAR SATUAN UPAH

NO URAIAN KODE SATUAN HARGA SATUAN KET.


1 ### 2 3 4 5 6

1 Mandor Hari 180,000.00


2 Kepala Tukang Hari 160,000.00
3 Tukang Hari 150,000.00
4 Pekerja/Buruh Lapangan Tak Terlatih Hari 130,000.00
DAFTAR ANALISA
PERHITUNGAN UNIT PRICE
DAERAH KABUPATEN BULUNGAN
TAHUN ANGGARAN 2007
HARGA UPAH HARGA
No. URAIAN PEKERJAAN SATUAN KERJA BAHAN JUMLAH
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3.00 4.00 5.00 6.00

I. PEKERJAAN PERSIAPAN ( SNI 03-2835-2002 )


1 Pagar sementara dari seng gelombang tinggi 2 meter per 1 M ' SK.SNI03-2835-2002
1.250 Btg Kayu perancah 4 m 18,630.00 23,287.50
2.500 Kg Semen Portland 2,500.00 6,250.00
1.200 Lbr Seng gelombang 3" - 4" 89,424.00 107,308.80
0.005 M3 Pasir beton 200,000.00 1,000.00
0.009 M3 Koral Sungai 350,000.00 3,150.00
0.072 M3 Kayu meranti 5 / 7 1,700,000.00 122,400.00
0.060 Kg Paku biasa 2 " - 3 " 30,000.00 1,800.00
0.450 Kg Meni besi 44,712.00 20,120.40
0.200 Oh Tukang kayu 100,000.00 20,000.00
0.400 Oh Pekerja 70,000.00 28,000.00
0.020 Oh Kepala tukang - -
0.020 Oh Mandor 120,000.00 2,400.00
50,400.00 285,316.70 335,716.70

2 Pagar sementara dari kawat duri tinggi 1,8 meter per 1 M '
1.000 Btg Kayu perancah 4 m 18,630.00 18,630.00
2.000 Kg Semen Portland 2,500.00 5,000.00
25.000 Kg Kawat duri 24,012.00 600,300.00
0.005 M3 Pasir beton 200,000.00 1,000.00
0.009 M3 Koral beton 434,700.00 3,912.30
0.060 Kg Paku biasa 2"-5' 30,000.00 1,800.00
0.200 Oh Tukang kayu 100,000.00 20,000.00
0.300 Oh Pekerja 70,000.00 21,000.00
0.020 Oh Kepala tukang - -
0.020 Oh Mandor 120,000.00 2,400.00
43,400.00 630,642.30 674,042.30

3 Pengukuran dan pemasangan bouwplank per M '


0.012 M3 Kayu meranti 5 / 7 1,700,000.00 20,400.00
0.020 Kg Paku biasa 2" - 5" 30,000.00 600.00
0.007 M3 Kayu papan meranti 3/20 1,700,000.00 11,900.00
0.100 Oh Tukang kayu 100,000.00 10,000.00
0.100 Oh Pekerja 70,000.00 7,000.00
0.010 Oh Kepala tukang - -
0.005 Oh Mandor 120,000.00 600.00
17,600.00 32,900.00 50,500.00

4 Pembuatan gudang semen dan alat - alat per 1 M2


1.700 Btg Kayu perancah 4 m 18,630.00 31,671.00
0.210 M3 Kayu 1,700,000.00 357,000.00
0.300 Kg Paku biasa 30,000.00 9,000.00
10.500 Kg Semen Portland 2,500.00 26,250.00
0.030 M3 Pasir beton 200,000.00 6,000.00
0.050 M3 Koral beton 434,700.00 21,735.00
1.500 Lbr Seng gelombang BJLS 30 98,808.00 148,212.00
2.000 Oh Tukang kayu 100,000.00 200,000.00
1.000 Oh Pekerja 70,000.00 70,000.00
0.200 Oh Kepala tukang - -
0.050 Oh Mandor 120,000.00 6,000.00
276,000.00 599,868.00 875,868.00

5 Pembuatan rumah jaga / kontruksi kayu per 1 M2


3.000 Btg Kayu perancah 4 m 18,630.00 55,890.00
0.276 M3 Kayu 1,700,000.00 469,200.00
0.700 Kg Paku biasa 30,000.00 21,000.00
1.500 Lbr Seng gelombang BJLS 30 98,808.00 148,212.00
1.500 Oh Tukang kayu 100,000.00 150,000.00
1.000 Oh Pekerja 70,000.00 70,000.00
0.150 Oh Kepala tukang - -
0.050 Oh Mandor 120,000.00 6,000.00
226,000.00 694,302.00 920,302.00

1 2 3.00 4.00 5.00 6.00

6 Pembuatan kantor sementara , dengan lantai plesteran per 1 m2


1.250 Btg Kayu perancah 4 m 18,630.00 23,287.50
0.180 M3 Kayu 1,700,000.00 306,000.00
0.850 Kg Paku biasa 30,000.00 25,500.00
1.100 Kg Besi strip 27,600.00 30,360.00
35.000 Kg Semen Portland 2,500.00 87,500.00
0.150 M3 Pasir pasang 200,000.00 30,000.00
0.100 M3 Pasir beton 200,000.00 20,000.00
0.150 M3 Koral beton 434,700.00 65,205.00
30.000 Bh Bata merah 1,518.00 45,540.00
0.250 Lbr Seng plat Bjls 20 89,424.00 22,356.00
2.000 Bh Jendela nako - -
0.080 M2 Kaca polos 3 mm 152,776.00 12,222.08
0.150 Bh Kunci tanam 86,526.00 12,978.90
0.060 Lbr Plywood 3 mm 92,322.00 5,539.32
2.000 Oh Tukang kayu 100,000.00 200,000.00
1.000 Oh Tukang batu 100,000.00 100,000.00
2.000 Oh Pekerja 70,000.00 140,000.00
0.300 Oh Kepala tukang - -
0.050 Oh Mandor 120,000.00 6,000.00
446,000.00 686,488.80 1,132,488.80

7 Membersihkan lapangan dan perataan per 1 M2


0.100 Oh Pekerja 70,000.00 7,000.00
0.050 Oh Mandor 120,000.00 6,000.00
13,000.00 13,000.00

8 Pembuatan bedeng buruh per 1 M2


1.250 Btg Kayu perancah 4 m 18,630.00 23,287.50
0.186 M3 Kayu balok 1,700,000.00 316,200.00
0.300 Kg Paku biasa 30,000.00 9,000.00
18.000 Kg Semen portland 2,500.00 45,000.00
0.030 M3 Pasir beton 200,000.00 6,000.00
0.050 M3 Koral beton 434,700.00 21,735.00
1.500 Lbr Seng gelombang BJLS 30 98,808.00 148,212.00
1.350 Lbr Ply wood 92,322.00 124,634.70
2.000 Oh Tukang kayu 100,000.00 200,000.00
1.000 Oh Pekerja 70,000.00 70,000.00
0.200 Oh Kepala tukang - -
0.050 Oh Mandor 120,000.00 6,000.00
276,000.00 694,069.20 970,069.20

9 Pembuatan Jalan sementara 1 M2


0.150 M3 Batu belah 15/20 267,582.00 40,137.30
0.090 M3 Batu pecah 5/7 434,700.00 39,123.00
0.010 M3 Pasir pasang 200,000.00 2,000.00
1.000 Oh Pekerja 70,000.00 70,000.00
0.050 Oh Mandor 120,000.00 6,000.00
76,000.00 81,260.30 157,260.30

10 Pembongkaran beton bertulang 1M3


6.667 Oh Pekerja 70,000.00 466,690.00
0.333 Oh Mandor 120,000.00 39,960.00
506,650.00 506,650.00

11 Bongkaran dinding tembok bata merah per 1 M3


6.667 Oh Pekerja 70,000.00 466,690.00
0.033 Oh Mandor 120,000.00 3,960.00
470,650.00 470,650.00
II. PEKERJAAN TANAH
DAFTAR ANALISA HARGA SATUAN

1 Galian tanah biasa sedalam 1 meter per 1 M3


0.400 Oh Pekerja 130,000.00 52,000.00
0.040 Oh Mandor 180,000.00 7,200.00
59,200.00 59,200.00
2 Urugan pasir per 1 M3
1.200 Oh Pasir urug 650,000.00 780,000.00
0.300 Oh Pekerja 130,000.00 39,000.00
0.010 Oh Mandor 180,000.00 1,800.00
40,800.00 780,000.00 820,800.00

3 Urugan tanah per 1 M3


1.200 Oh Tanah urug 55,000.00 66,000.00
0.250 Oh Pekerja 130,000.00 32,500.00
0.025 Oh Mandor 180,000.00 4,500.00
37,000.00 66,000.00 103,000.00

4 Membuat beton tumbuk / rabat 1 Pc : 3 Ps : 5 Kr Per 1 M3 SNI 2001


218.000 Kg Semen Portland 2,400.00 523,200.00
0.520 M3 Pasir beton 210,000.00 109,200.00
0.870 M3 Koral beton 700,000.00 609,000.00
1.650 Oh Pekerja 130,000.00 214,500.00
0.250 Oh Tukang batu 150,000.00 37,500.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.080 Oh Mandor 180,000.00 14,400.00
270,400.00 1,241,400.00 1,511,800.00

5 Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr Per 1 M3


336.000 Kg Semen Portland 2,400.00 806,400.00
0.540 M3 Pasir beton 210,000.00 113,400.00
0.780 M3 Koral beton 700,000.00 546,000.00
1.650 Oh Pekerja 130,000.00 214,500.00
0.250 Oh Tukang batu 150,000.00 37,500.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.080 Oh Mandor 180,000.00 14,400.00
270,400.00 1,465,800.00 1,736,200.00

6 Pembesian dengan besi polos atau besi ulir per 1 Kg


1.050 Kg Besi beton ( polos / ulir ) 150,000.00 157,500.00
0.015 Kg Kawat beton 30,000.00 450.00
0.007 Oh Pekerja 130,000.00 910.00
0.007 Oh Tukang besi 150,000.00 1,050.00
0.0007 Oh Kepala tukang 160,000.00 112.00
0.0003 Oh Mandor 180,000.00 54.00
2,126.00 157,950.00 160,076.00

7 a. Pasang bekisting untuk sloof per 1 M2


0.045 M3 Kayu bekisting 1,650,000.00 74,250.00
0.300 Kg Paku biasa 2 " - 5 " 30,000.00 9,000.00
0.100 Lt Minyak bekisting 44,000.00 4,400.00
0.300 Oh Pekerja 130,000.00 39,000.00
0.260 Oh Tukang kayu 150,000.00 39,000.00
0.026 Oh Kepala tukang 160,000.00 4,160.00
0.005 Oh Mandor 180,000.00 900.00
83,060.00 87,650.00 170,710.00

b. 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting 16,612.00


1 2 3.00 4.00 5.00 6.00
12 a. Pasang bekisting untuk kolom per 1 M2
0.040 M3 Kayu bekisting 1,650,000.00 66,000.00
0.400 Kg Paku biasa 2 " - 5 " 30,000.00 12,000.00
0.200 Lt Minyak bekisting 44,000.00 8,800.00
0.015 M3 Balok kayu 1,650,000.00 24,750.00
0.020 M3 Papan bekisting 1,650,000.00 33,000.00
2.000 Btg Kayu Perancah 4 m 18,630.00 37,260.00
0.300 Oh Pekerja 130,000.00 39,000.00
0.330 Oh Tukang kayu 150,000.00 49,500.00
0.033 Oh Kepala tukang 160,000.00 5,280.00
0.006 Oh Mandor 180,000.00 1,080.00
94,860.00 181,810.00 276,670.00

b. 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting 18,972.00

13 a. Pasang bekisting untuk balok per 1 M2


0.040 M3 Kayu bekisting 1,650,000.00 66,000.00
0.400 Kg Paku biasa 2 " - 5 " 30,000.00 12,000.00
0.200 Lt Minyak bekisting 44,000.00 8,800.00
0.018 M3 Balok kayu 1,650,000.00 29,700.00
0.020 M3 Papan bekisting 1,650,000.00 33,000.00
2.000 Btg Kayu Perancah 4 m 18,630.00 37,260.00
0.320 Oh Pekerja 130,000.00 41,600.00
0.330 Oh Tukang kayu 150,000.00 49,500.00
0.033 Oh Kepala tukang 160,000.00 5,280.00
0.006 Oh Mandor 180,000.00 1,080.00
97,460.00 186,760.00 284,220.00
b. 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting 19,492.00

14 a. Pasang bekisting untuk lantai per 1 M2


0.040 M3 Kayu bekisting 1,650,000.00 66,000.00
0.400 Kg Paku biasa 2 " - 5 " 30,000.00 12,000.00
0.200 Lt Minyak bekisting 44,000.00 8,800.00
0.015 M3 Balok kayu 1,650,000.00 24,750.00
0.020 M3 Papan bekisting 1,650,000.00 33,000.00
6.000 Btg Kayu Perancah 4 m 18,630.00 111,780.00
0.320 Oh Pekerja 130,000.00 41,600.00
0.330 Oh Tukang kayu 150,000.00 49,500.00
0.033 Oh Kepala tukang 160,000.00 5,280.00
0.006 Oh Mandor 180,000.00 1,080.00
97,460.00 256,330.00 353,790.00
b. 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting 19,492.00

15 a. Pasang bekisting untuk dinding per 1 M2


0.030 M3 Kayu bekisting 1,650,000.00 49,500.00
0.400 Kg Paku biasa 2 " - 5 " 30,000.00 12,000.00
0.200 Lt Minyak bekisting 44,000.00 8,800.00
0.020 M3 Balok kayu 1,650,000.00 33,000.00
0.020 M3 Papan bekisting 1,650,000.00 33,000.00
3.000 Btg Kayu Perancah 4 m 18,630.00 55,890.00
4.000 Bh Suai jarak bekisting 18,630.00 74,520.00
0.320 Oh Pekerja 130,000.00 41,600.00
0.330 Oh Tukang kayu 150,000.00 49,500.00
0.033 Oh Kepala tukang 160,000.00 5,280.00
0.006 Oh Mandor 180,000.00 1,080.00
97,460.00 266,710.00 364,170.00
b. 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting 19,492.00

16 a. Pasang bekisting untuk tangga per 1M2


0.030 M3 Kayu bekisting 1,650,000.00 49,500.00
0.400 Kg Paku biasa 2 " - 5 " 30,000.00 12,000.00
0.150 Lt Minyak bekisting 44,000.00 6,600.00
0.015 M3 Balok kayu 1,650,000.00 24,750.00
0.020 M3 Papan bekisting 1,650,000.00 33,000.00
2.000 Btg Kayu Perancah 4 m 18,630.00 37,260.00
0.320 Oh Pekerja 130,000.00 41,600.00
0.330 Oh Tukang kayu 150,000.00 49,500.00
0.033 Oh Kepala tukang 160,000.00 5,280.00
0.006 Oh Mandor 180,000.00 1,080.00
97,460.00 163,110.00 260,570.00
b. 1 M2 Bongkar bekesting = 1/5 x upah pasang bekesting 19,492.00

1 2 3.00 4.00 5.00 6.00


17 Membuat beton dengan mutu K 225 per M3
388.000 Kg Semen portland 2,400.00 931,200.00
0.650 M3 Pasir beton 210,000.00 136,500.00
0.650 M3 Koral beton 700,000.00 455,000.00
6.000 Oh Pekerja 130,000.00 780,000.00
1.000 Oh Tukang batu 150,000.00 150,000.00
0.100 Oh Kepala tukang 160,000.00 16,000.00
0.300 Oh Mandor 180,000.00 54,000.00
1,000,000.00 1,522,700.00 2,522,700.00

18 Membuat beton dengan mutu K 275 per M3


400.000 Kg Semen portland 2,400.00 960,000.00
0.400 M3 Pasir beton 210,000.00 84,000.00
0.820 M3 Koral beton 700,000.00 574,000.00
6.000 Oh Pekerja 130,000.00 780,000.00
1.000 Oh Tukang batu 150,000.00 150,000.00
0.100 Oh Kepala tukang 160,000.00 16,000.00
0.300 Oh Mandor 180,000.00 54,000.00
1,000,000.00 1,618,000.00 2,618,000.00

19 Membuat kolom penguat beton bertulang ( 11 x 11 ) cm per 1 M '


0.002 M3 Kayu bekisting 1,650,000.00 3,300.00
0.010 Kg Paku biasa 2 " - 5 " 30,000.00 300.00
3.000 kg Besi beton polos 150,000.00 450,000.00
0.450 Kg Kawat beton 30,000.00 13,500.00
4.000 Kg Semen portland 2,400.00 9,600.00
0.006 M3 Pasir beton 210,000.00 1,260.00
0.009 M3 Koral beton 700,000.00 6,300.00
0.060 Oh Pekerja 130,000.00 7,800.00
0.020 Oh Tukang batu 150,000.00 3,000.00
0.020 Oh Tukang kayu 150,000.00 3,000.00
0.020 Oh Tukang besi 150,000.00 3,000.00
0.006 Oh Kepala tukang 160,000.00 960.00
0.003 Oh Mandor 180,000.00 540.00
18,300.00 484,260.00 502,560.00

20 Membuat ring balok beton bertulang ( 10 x 15 ) cm per 1M'


0.003 M3 Kayu bekisting 1,650,000.00 4,950.00
0.020 Kg Paku biasa 2 " - 5 " 30,000.00 600.00
3.600 kg Besi beton polos 150,000.00 540,000.00
0.050 Kg Kawat beton 30,000.00 1,500.00
5.500 Kg Semen portland 2,400.00 13,200.00
0.009 M3 Pasir beton 210,000.00 1,890.00
0.015 M3 Koral beton 700,000.00 10,500.00
0.100 Oh Pekerja 130,000.00 13,000.00
0.033 Oh Tukang batu 150,000.00 4,950.00
0.033 Oh Tukang kayu 150,000.00 4,950.00
0.033 Oh Tukang besi 150,000.00 4,950.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.005 Oh Mandor 180,000.00 900.00
30,350.00 572,640.00 602,990.00

VI. P E K E R J A A N P L E S T E R A N ( SNI 03-2837-2002 )

1. Plesteran 1 Pc : 1 Ps, tebal 15 mm per 1 M2


12.920 Kg Semen portland 2,400.00 31,008.00
0.013 M3 Pasir pasang 210,000.00 2,730.00
0.200 Oh Pekerja 130,000.00 26,000.00
0.150 Oh Tukang batu 150,000.00 22,500.00
0.015 Oh Kepala tukang 160,000.00 2,400.00
0.010 Oh Mandor 180,000.00 1,800.00
52,700.00 33,738.00 86,438.00

8 Plesteran 1 Pc : 2 Ps, tebal 15 mm per 1 M2


8.520 Kg Semen portland 2,400.00 20,448.00
0.017 M3 Pasir pasang 210,000.00 3,570.00
0.200 Oh Pekerja 130,000.00 26,000.00
0.150 Oh Tukang batu 150,000.00 22,500.00
0.015 Oh Kepala tukang 160,000.00 2,400.00
0.010 Oh Mandor 180,000.00 1,800.00
52,700.00 24,018.00 76,718.00

1 2 3.00 4.00 5.00 6.00


9 Plesteran 1 Pc : 4 Ps tebal 15 mm per 1 M2
5.200 Kg Semen portland 2,400.00 12,480.00
0.020 M3 Pasir pasang 210,000.00 4,200.00
0.200 Oh Pekerja 130,000.00 26,000.00
0.150 Oh Tukang batu 150,000.00 22,500.00
0.015 Oh Kepala tukang 160,000.00 2,400.00
0.010 Oh Mandor 180,000.00 1,800.00
52,700.00 16,680.00 69,380.00

4 Plesteran 1 Pc : 2 Ps tebal 20 mm per 1 M2


14.280 Kg Semen portland 2,400.00 34,272.00
0.023 M3 Pasir pasang 210,000.00 4,830.00
0.250 Oh Pekerja 130,000.00 32,500.00
0.200 Oh Tukang batu 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.0125 Oh Mandor 180,000.00 2,250.00
67,950.00 39,102.00 107,052.00

5 Plesteran 1 Pc : 4 Ps tebal 20 mm per 1 M2


8.680 Kg Semen portland 2,400.00 20,832.00
0.028 M3 Pasir pasang 210,000.00 5,880.00
0.250 Oh Pekerja 130,000.00 32,500.00
0.200 Oh Tukang batu 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.0125 Oh Mandor 180,000.00 2,250.00
67,950.00 26,712.00 94,662.00

6 Plesteran 1 Pc : 2 Ps tebal 25 mm per 1 M2


15.500 Kg Semen portland 2,400.00 37,200.00
0.013 M3 Pasir pasang 210,000.00 2,730.00
0.300 Oh Pekerja 130,000.00 39,000.00
0.200 Oh Tukang batu 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.013 Oh Mandor 180,000.00 2,340.00
74,540.00 39,930.00 114,470.00

7 Plesteran 1 Pc : 4 Ps tebal 25 mm per 1 M2


9.480 Kg Semen portland 2,400.00 22,752.00
0.038 M3 Pasir pasang 210,000.00 7,980.00
0.300 Oh Pekerja 130,000.00 39,000.00
0.200 Oh Tukang batu 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.013 Oh Mandor 180,000.00 2,340.00
74,540.00 30,732.00 105,272.00

8 Plesteran 1 Pc : 2 Ps tebal 30 mm per 1 M2


18.650 Kg Semen portland 2,400.00 44,760.00
0.035 M3 Pasir pasang 210,000.00 7,350.00
0.320 Oh Pekerja 130,000.00 41,600.00
0.250 Oh Tukang batu 150,000.00 37,500.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.015 Oh Mandor 180,000.00 2,700.00
85,800.00 52,110.00 137,910.00

9 Plesteran 1 Pc : 4 Ps tebal 30 mm per 1 M2


11.380 Kg Semen portland 2,400.00 27,312.00
0.042 M3 Pasir pasang 210,000.00 8,820.00
0.320 Oh Pekerja 130,000.00 41,600.00
0.250 Oh Tukang batu 150,000.00 37,500.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.015 Oh Mandor 180,000.00 2,700.00
85,800.00 36,132.00 121,932.00

10 Berapen 1 Pc : 3 Ps, tebal 30 cm per 1 M2


7.070 Kg Semen portland 2,400.00 16,968.00
0.021 M3 Pasir pasang 210,000.00 4,410.00
0.150 Oh Pekerja 130,000.00 19,500.00
0.070 Oh Tukang batu 150,000.00 10,500.00
0.007 Oh Kepala tukang 160,000.00 1,120.00
0.008 Oh Mandor 180,000.00 1,440.00
32,560.00 21,378.00 53,938.00
1 2 3.00 4.00 5.00 6.00
11 Berapen 1 Pc : 5 Ps, tebal 15 cm per 1 M2
5.670 Kg Semen portland 2,400.00 13,608.00
0.023 M3 Pasir pasang 210,000.00 4,830.00
0.150 Oh Pekerja 130,000.00 19,500.00
0.070 Oh Tukang batu 150,000.00 10,500.00
0.007 Oh Kepala tukang 160,000.00 1,120.00
0.008 Oh Mandor 180,000.00 1,440.00
32,560.00 18,438.00 50,998.00

12 Plesteran beton 1 Pc : 2 Ps tebal 15 mm per 1 M2


9.300 Kg Semen portland 2,400.00 22,320.00
0.018 M3 Pasir pasang 210,000.00 3,780.00
0.260 Oh Pekerja 130,000.00 33,800.00
0.200 Oh Tukang batu 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.013 Oh Mandor 180,000.00 2,340.00
69,340.00 26,100.00 95,440.00

13 Plesteran Granito, 1 PC warna : 2 Granito tebal 10 mm per 1 M2


0.144 Kg PC warna - -
15.000 Kg Batu Granito - -
0.050 Oh Pekerja 130,000.00 6,500.00
0.020 Oh Tukang batu 150,000.00 3,000.00
0.002 Oh Kepala tukang 160,000.00 320.00
0.005 Oh Mandor 180,000.00 900.00
10,720.00 - 10,720.00

14 Plesteran Teraso, 1 PC warna : 2 Batu Teraso tebal 10 mm per 1 M2


0.440 Kg PC warna - -
11.500 Kg Batu Teraso - -
0.450 Oh Pekerja 130,000.00 58,500.00
0.200 Oh Tukang batu 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.025 Oh Mandor 180,000.00 4,500.00
96,200.00 - 96,200.00

15 Plesteran Ciprat 1 Pc : 2 Ps per 1 M2


4.320 Kg Semen portland 2,400.00 10,368.00
0.016 M3 Pasir pasang 210,000.00 3,360.00
0.250 Oh Pekerja 130,000.00 32,500.00
0.100 Oh Tukang batu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.015 Oh Mandor 180,000.00 2,700.00
51,800.00 13,728.00 65,528.00

16 Plesteran siar adukan 1 Pc : 2 Ps per 1 M2


4.320 Kg Semen portland 2,400.00 10,368.00
0.016 Kg Pasir pasang 210,000.00 3,360.00
0.150 Oh Pekerja 130,000.00 19,500.00
0.070 Oh Tukang batu 150,000.00 10,500.00
0.007 Oh Kepala tukang 160,000.00 1,120.00
0.008 Oh Mandor 180,000.00 1,440.00
32,560.00 13,728.00 46,288.00

17 Benangan sudut per 1M'


0.0040 Zak Semen portland 125,000.00 500.00
0.0130 M3 Pasir pasang 210,000.00 2,730.00
0.0700 Oh Tukang batu 150,000.00 10,500.00
0.0300 Oh Pekerja 130,000.00 3,900.00
0.0070 Oh Kepala tukang 160,000.00 1,120.00
0.0080 Oh Mandor 180,000.00 1,440.00
16,960.00 3,230.00 20,190.00

VII. P E K E R J A A N K A Y U

1 Sebuah tiang pancang dicincin dan dilancipkan - BOW - E.1


0.005 Mandor 180,000.00 900.00
0.025 Kepala tukang kayu 160,000.00 4,000.00
0.250 Tukang kayu 150,000.00 37,500.00
0.100 Pekerja 130,000.00 13,000.00
55,400.00 - 55,400.00

1 2 3.00 4.00 5.00 6.00


2 Membuat pen pada tiang dan lubang pada balok pemikul tiap-tiap pasangan pen dan lubang - BOW - E.4
0.600 Tukang kayu 150,000.00 90,000.00
0.060 Kepala tukang kayu 160,000.00 9,600.00
99,600.00 5.00 99,605.00

3 Memancang tiang pada tanah lunak per m' - BOW - E.13


0.043 Mandor 180,000.00 7,740.00
0.004 Kepala tukang kayu 160,000.00 640.00
0.040 Tukang kayu 150,000.00 6,000.00
1.800 Pekerja 130,000.00 234,000.00
E.13 248,380.00 - 248,380.00
Untuk tanah biasa 1 1/4 x E.13 310,475.00 - 310,475.00
Untuk tanah keras 1 1/2 x E.13 372,570.00 - 372,570.00

4 Pasangan tongkat, sloop, gelegar dari kayu ulin per m3 - BOW - F.1
1.000 M3 Balok kayu ulin 6,000,000.00 6,000,000.00
1.000 Kg Paku ulin 43,056.00 43,056.00
4.000 Baud 28,980.00 115,920.00
0.250 Mandor 180,000.00 45,000.00
1.500 Kepala tukang kayu 160,000.00 240,000.00
1.000 Tukang kayu 150,000.00 150,000.00
2.000 Pekerja 130,000.00 260,000.00
695,000.00 6,158,976.00 6,853,976.00

5 Pasangan gelegar kayu kapur/lembasung per m3 - BOW - F.1.a


1.000 M3 Balok kayu kapur/lembasung 2,118,300.00 2,118,300.00
1.000 Kg Paku 30,000.00 30,000.00
0.250 Mandor 180,000.00 45,000.00
1.500 Kepala tukang kayu 160,000.00 240,000.00
15.000 Tukang kayu 150,000.00 2,250,000.00
5.000 Pekerja 130,000.00 650,000.00
3,185,000.00 2,148,300.00 5,333,300.00

6 Pasangan Lantai dari papan kayu kapur/lemabsung per m2 - BOW - F.37


0.0250 M3 Papan kayu kapur/lembasung 2,346,000.00 58,650.00
0.2000 Kg Paku 30,000.00 6,000.00
0.0140 Mandor 180,000.00 2,520.00
0.0800 Kepala tukang kayu 160,000.00 12,800.00
0.8000 Tukang kayu 150,000.00 120,000.00
0.2800 Pekerja 130,000.00 36,400.00
171,720.00 64,650.00 236,370.00

7 Pasangan lantai dari papan kayu meranti per m2 - BOW - F.37.a


0.0250 M3 Papan kayu meranti 1,700,000.00 42,500.00
0.2000 Kg Paku 30,000.00 6,000.00
0.0140 Mandor 180,000.00 2,520.00
0.0800 Kepala tukang kayu 160,000.00 12,800.00
0.8000 Tukang kayu 150,000.00 120,000.00
0.2800 Pekerja 130,000.00 36,400.00
171,720.00 48,500.00 220,220.00
Apabila hanya diketam salah satu sisinya saja 85,860.00 48,500.00 134,360.00

8 Pasangan lantai dari papan kayu ulin per m2 - BOW - F.37.b


0.0250 M3 Papan kayu ulin 6,000,000.00 150,000.00
0.2000 Kg Paku ulin 43,056.00 8,611.20
0.0140 Mandor 180,000.00 2,520.00
0.0800 Kepala tukang kayu 160,000.00 12,800.00
0.8000 Tukang kayu 150,000.00 120,000.00
0.2800 Pekerja 130,000.00 36,400.00
171,720.00 158,611.20 330,331.20
Apabila hanya diketam salah satu sisinya saja 85,860.00 158,611.20 244,471.20

10 1Ttk Memancang tiang pancang kayu ulin 10/10 - 2 m


1.000 M3 Kayu ulin 10/10 - 2 m 6,000,000.00 6,000,000.00
3.000 Baud 28,980.00 86,940.00
0.043 Mandor 180,000.00 7,740.00
0.004 Kepala tukang kayu 160,000.00 640.00
0.040 Tukang kayu 150,000.00 6,000.00
1.800 Pekerja 130,000.00 234,000.00
0.060 Alat Bantu 35,000.00 2,100.00
248,380.00 6,089,040.00 6,337,420.00

1 2 3.00 4.00 5.00 6.00


9b. 1Ttk Memancang tiang pancang kayu ulin 10/10 - 4 m
0.04 M3 Kayu ulin 10/10 - 4 m 6,000,000.00 240,000.00 ###
0.043 Mandor 180,000.00 7,740.00 ###
0.004 Kepala tukang kayu 160,000.00 640.00 ###
0.040 Tukang kayu 150,000.00 6,000.00 ###
1.800 Pekerja 130,000.00 234,000.00
0.1200 Alat Bantu 35,000.00 4,200.00 ###
248,380.00 244,200.00 492,580.00

10 Rangka badan/tiang jenang dari kayu kapur/lembasung per m3 - BOW - F.26


1.200 M3 kayu kapur/lembasung 2,118,300.00 2,541,960.00
0.200 Kg Paku 30,000.00 6,000.00
0.500 Mandor 180,000.00 90,000.00
3.000 Kepala tukang kayu 160,000.00 480,000.00
30.000 Tukang kayu 150,000.00 4,500,000.00
10.000 Pekerja 130,000.00 1,300,000.00
6,370,000.00 2,547,960.00 8,917,960.00

###
11 Pasangan sunduk,kalang dari kayu ulin per m3 - BOW - F.1 ###
1.000 M3 Balok kayu ulin 6,000,000.00 6,000,000.00 ###
1.000 Kg Paku ulin 43,056.00 43,056.00 ###
0.250 Mandor 180,000.00 45,000.00 ###
1.500 Kepala tukang kayu 160,000.00 240,000.00 ###
15.000 Tukang kayu 150,000.00 2,250,000.00 ###
5.000 Pekerja 130,000.00 650,000.00
3,185,000.00 6,043,056.00 9,228,056.00

12 Pasang kusen pintu dan jendela kayu lembasung/kapur per 1 M3 ###


1.200 M3 Kayu balok lembasung 2,118,300.00 2,541,960.00 ###
6.000 Oh Pekerja 130,000.00 780,000.00 ###
18.000 Oh Tukang kayu 150,000.00 2,700,000.00 ###
2.000 Oh Kepala tukang 160,000.00 320,000.00 ###
0.300 Oh Mandor 180,000.00 54,000.00 ###
3,854,000.00 2,541,960.00 6,395,960.00
###

13 Pasang jalusi mati kusen kayu Lembasung per 1 M2


0.060 M3 Kayu Lembasung, papan 2,118,300.00 127,098.00
0.150 Kg Paku biasa 1/2 " - 1 " 30,000.00 4,500.00
0.500 Oh Pekerja 130,000.00 65,000.00
2.000 Oh Tukang kayu 150,000.00 300,000.00
0.200 Oh Kepala tukang 160,000.00 32,000.00
0.025 Oh Mandor 180,000.00 4,500.00
401,500.00 131,598.00 533,098.00

14 Rangka atap/kuda-kuda kayu per m3 - SK SNI T - 11 - 1993 - 03


1.1000 M3 Kayu kapur/lembasung 2,118,300.00 2,330,130.00
3.0000 Kg Baut/paku 28,152.00 84,456.00
15.0000 Kg Besi setrip 27,600.00 414,000.00
0.3000 Oh Mandor 180,000.00 54,000.00
1.8000 Oh Kepala tukang kayu 160,000.00 288,000.00
18.0000 Oh Tukang kayu 150,000.00 2,700,000.00
6.0000 Oh Pekerja 130,000.00 780,000.00
3,822,000.00 2,828,586.00 6,650,586.00

15 Pasang gording bahan kayu kapur/lembasung per m3 - SK SNI T - 11 - 1993 - 03


1.100 M3 Kayu kapur/lembasung 2,118,300.00 2,330,130.00
2.200 Kg Paku 30,000.00 66,000.00
0.097 Mandor 180,000.00 17,460.00
0.580 Kepala tukang kayu 160,000.00 92,800.00
5.800 Tukang kayu 150,000.00 870,000.00
1.940 Pekerja 130,000.00 252,200.00
1,232,460.00 2,396,130.00 3,628,590.00

16 Pasang kaso + reng genteng glazuur kayu Lembasung per 1 M2 ###


0.012 M3 Kayu Lembasung, balok 2,118,300.00 25,419.60 ###
0.150 Kg paku biasa 2" - 5 " 30,000.00 4,500.00 ###
0.100 Oh Pekerja 130,000.00 13,000.00 ###
0.100 Oh Tukang kayu 150,000.00 15,000.00 ###
0.010 Oh Kepala tukang 160,000.00 1,600.00 ###
0.005 Oh Mandor 180,000.00 900.00 ###
30,500.00 29,919.60 60,419.60

1 2 3.00 4.00 5.00 6.00


17 Pasang kaso + reng genteng monier kayu Lembasung per 1 M2
0.014 M3 Kayu Lembasung, balok 2,118,300.00 29,656.20
0.150 Kg paku biasa 2" - 5 " 30,000.00 4,500.00
0.100 Oh Pekerja 130,000.00 13,000.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.005 Oh Mandor 180,000.00 900.00
30,500.00 34,156.20 64,656.20

18 Pasang kaso + reng genteng beton kayu lembasung per 1 M2


0.014 M3 Kayu , balok lembasung 2,118,300.00 29,656.20
0.150 Kg Paku biasa 2" - 5" 30,000.00 4,500.00
0.100 Oh Pekerja 130,000.00 13,000.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.005 Oh Mandor 180,000.00 900.00
30,500.00 34,156.20 64,656.20

19 Pasang kaso + reng genteng glazuur kayu Meranti per 1 M2


0.012 M3 Kayu meranti 1,700,000.00 20,400.00
0.150 Kg paku biasa 2" - 5 " 30,000.00 4,500.00
0.100 Oh Pekerja 130,000.00 13,000.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.005 Oh Mandor 180,000.00 900.00
30,500.00 24,900.00 55,400.00

20 Pasang kaso + reng genteng monier kayu Meranti per 1 M2


0.014 M3 Kayu meranti 1,700,000.00 23,800.00
0.150 Kg paku biasa 2" - 5 " 30,000.00 4,500.00
0.100 Oh Pekerja 130,000.00 13,000.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.005 Oh Mandor 180,000.00 900.00
30,500.00 28,300.00 58,800.00

21 Pasang kaso + reng genteng Metal kayu Meranti per 1 M2


0.012 M3 Kayu meranti 1,700,000.00 20,400.00
0.150 Kg paku biasa 2" - 5 " 30,000.00 4,500.00
0.100 Oh Pekerja 130,000.00 13,000.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.005 Oh Mandor 180,000.00 900.00
30,500.00 24,900.00 55,400.00

22 Pasang kaso + reng genteng Metal kayu Lembasung per 1 M2


0.012 M3 Kayu Lembasung 2,118,300.00 25,419.60
0.150 Kg paku biasa 2" - 5 " 30,000.00 4,500.00
0.100 Oh Pekerja 130,000.00 13,000.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.005 Oh Mandor 180,000.00 900.00
30,500.00 29,919.60 60,419.60

23 Pasang rangka langit - langit ( 1.00 x 1.00 ) m, kayu meranti per 1 M2


0.012 M3 Kayu meranti 1,700,000.00 20,400.00
0.100 Kg Paku biasa 2" - 5" 30,000.00 3,000.00
0.150 Oh Pekerja 130,000.00 19,500.00
0.250 Oh Tukang kayu 150,000.00 37,500.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.075 Oh Mandor 180,000.00 13,500.00
74,500.00 23,400.00 97,900.00

24 Pasang rangka langit - langit ( 0.30 x 0.60 ) m, kayu meranti per 1 M2


0.023 M3 Kayu meranti 1,700,000.00 39,100.00
0.150 Kg Paku biasa 2" - 5" 30,000.00 4,500.00
0.200 Oh Pekerja 130,000.00 26,000.00
0.300 Oh Tukang kayu 150,000.00 45,000.00
0.030 Oh Kepala tukang 160,000.00 4,800.00
0.010 Oh Mandor 180,000.00 1,800.00
77,600.00 43,600.00 121,200.00

1 2 3.00 4.00 5.00 6.00

25 Pasang lisplang ukuran ( 3 x 20 ) cm, kayu Lembasung/sejenisnya per 1 m1


0.0072 M3 Kayu Lembasung, papan 2,118,300.00 15,251.76
0.050 Kg Paku biasa 2" - 5" 30,000.00 1,500.00
0.100 Oh Pekerja 130,000.00 13,000.00
0.200 Oh Tukang kayu 150,000.00 30,000.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.005 Oh ` 180,000.00 900.00
47,900.00 16,751.76 64,651.76

26 Pasang lisplang ukuran ( 3 x 30 ) cm, kayu Lembasung/sejenisnya per 1 m1


0.011 M3 Kayu Lembasung, papan 2,118,300.00 23,301.30
0.050 Kg Paku biasa 2" - 5" 30,000.00 1,500.00
0.110 Oh Pekerja 130,000.00 14,300.00
0.220 Oh Tukang kayu 150,000.00 33,000.00
0.022 Oh Kepala tukang 160,000.00 3,520.00
0.005 Oh Mandor 180,000.00 900.00
51,720.00 24,801.30 76,521.30

27 Pasang lisplang ukuran 2 x ( 3 x 20 ) cm, kayu Lembasung/sejenisnya per 1 m1


0.0145 M3 Kayu Lembasung, papan 2,118,300.00 30,715.35
0.060 Kg Paku biasa 2" - 5" 30,000.00 1,800.00
0.150 Oh Pekerja 130,000.00 19,500.00
0.250 Oh Tukang kayu 150,000.00 37,500.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.075 Oh Mandor 180,000.00 13,500.00
74,500.00 32,515.35 107,015.35

28 Pasang lisplang ukuran 2 x ( 2 x 20 ) cm, kayu Lembasung/sejenisnya per 1 m1


0.0086 M3 Kayu Lembasung, papan 2,118,300.00 18,217.38
0.060 Kg Paku biasa 2" - 5" 30,000.00 1,800.00
0.100 Oh Pekerja 130,000.00 13,000.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.050 Oh Mandor 180,000.00 9,000.00
38,600.00 20,017.38 58,617.38

29 Pasang rangka dinding pemisah kayu lembasung/sejenisnya per 1 M2


0.0195 M3 Kayu , balok 2,118,300.00 41,306.85
0.007 M3 Kayu , papan 2,118,300.00 14,828.10
0.100 Kg Paku biasa 2" - 5" 30,000.00 3,000.00
0.150 Oh Pekerja 130,000.00 19,500.00
0.450 Oh Tukang kayu 150,000.00 67,500.00
0.045 Oh Kepala tukang 160,000.00 7,200.00
0.075 Oh Mandor 180,000.00 13,500.00
107,700.00 59,134.95 166,834.95

30 Pasang dinding pemisah Plywood rangkap, rangka kayu Lembasung per 1 M2


0.0195 M3 Kayu Lembasung, balok 2,118,300.00 41,306.85
0.007 M3 Kayu Lembasung, papan 2,118,300.00 14,828.10
0.100 Kg Paku biasa 2" - 5" 30,000.00 3,000.00
0.560 Lt Lem kayu 48,300.00 27,048.00
1.000 Lbr Plywood 4' x 8' x 4 mm 92,322.00 92,322.00
0.200 Oh Pekerja 130,000.00 26,000.00
0.600 Oh Tukang kayu 150,000.00 90,000.00
0.060 Oh Kepala tukang 160,000.00 9,600.00
0.010 Oh Mandor 180,000.00 1,800.00
127,400.00 178,504.95 305,904.95

31 Pasang list plafond - kayu profil


1.050 M' Kayu profil 13,524.00 14,200.20
0.021 Oh Pekerja 130,000.00 2,730.00
0.021 Oh Tukang kayu 150,000.00 3,150.00
0.002 Oh Kepala tukang 160,000.00 320.00
0.001 Oh Mandor 180,000.00 180.00
6,380.00 14,200.20 20,580.20

1 2 3.00 4.00 5.00 6.00

VIII. P E K E R J A A N P E N U T U P A T A P ( SNI 03-3436-2002 )

1. Pasang atap genteng glazzur 1 M2


25.000 Bh Genteng glazuur 48,714.00 1,217,850.00
0.150 Oh Pekerja 130,000.00 19,500.00
0.075 Oh Tukang kayu 150,000.00 11,250.00
0.008 Oh Kepala tukang 160,000.00 1,280.00
0.008 Oh Mandor 180,000.00 1,440.00
33,470.00 1,217,850.00 1,251,320.00

2. Pasang bubung genteng glazuur per 1 m '


5.000 Bh Genteng bubung glazuur 29,670.00 148,350.00
8.000 Kg Semen portland 2,400.00 19,200.00
0.032 M3 Pasir pasang 210,000.00 6,720.00
0.400 Oh Pekerja 130,000.00 52,000.00
0.200 Oh Tukang kayu 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.002 Oh Mandor 180,000.00 360.00
85,560.00 174,270.00 259,830.00

3. Pasang roof light fibreglass ( 180 x 90 ) cm per 1 m2


0.600 Lbr roof light fibreglass - -
0.050 Kg Paku biasa 1/2 " - 1 " 30,000.00 1,500.00
0.140 Oh Pekerja 130,000.00 18,200.00
0.067 Oh Tukang kayu 150,000.00 10,050.00
0.007 Oh Kepala tukang 160,000.00 1,120.00
0.007 Oh Mandor 180,000.00 1,260.00
30,630.00 1,500.00 32,130.00

4. Pasang atap genteng beton per 1 M2


11.00 Bh Genteng beton - -
0.030 Kg Paku biasa 2" - 5" 30,000.00 900.00
0.200 Oh Pekerja 130,000.00 26,000.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.010 Oh Mandor 180,000.00 1,800.00
44,400.00 900.00 45,300.00

5 Pasang nok genteng beton per 1 M'


3.500 Bh Nok genteng beton - -
0.050 Kg Paku biasa 2 " - 5 " 30,000.00 1,500.00
10.800 Kg Semen abu - abu - -
0.032 M3 Pasir pasang 210,000.00 6,720.00
1.000 Kg Semen Warna - -
0.400 Oh Pekerja 130,000.00 52,000.00
0.200 Oh Tukang kayu 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.020 Oh Mandor 180,000.00 3,600.00
88,800.00 8,220.00 97,020.00

6 Menutup Atap dengan genteng Metal Surya roof per m2


1.6234 Lbr Genteng Metal Surya Roof 137,448.00 223,133.08
12.0000 Bh Paku - -
0.0100 Mandor 180,000.00 1,800.00
0.0100 Kepala tukang kayu 160,000.00 1,600.00
0.1000 Tukang kayu 150,000.00 15,000.00
0.2000 Pekerja 130,000.00 26,000.00
44,400.00 223,133.08 267,533.08

7 Menutup bubungan pada genteng metal Surya roof per m' - SK SNI T - 13 - 1993 - 03
2.500 Bh Bubungan surya roof 53,820.00 134,550.00
10.000 Bh Paku - -
0.004 M3 Kayu Lembasung/ sejenis 2,118,300.00 8,473.20
0.0100 Mandor 180,000.00 1,800.00
0.0100 Kepala tukang kayu 160,000.00 1,600.00
0.1000 Tukang kayu 150,000.00 15,000.00
0.2000 Pekerja 130,000.00 26,000.00
44,400.00 143,023.20 187,423.20

1 2 3.00 4.00 5.00 6.00

8 Menutup Atap dengan genteng Metal sakura roof per m2


1.6234 Lbr Genteng Metal 78,246.00 127,024.56
12.0000 Bh Paku - -
0.0100 Mandor 180,000.00 1,800.00
0.0100 Kepala tukang kayu 160,000.00 1,600.00
0.1000 Tukang kayu 150,000.00 15,000.00
0.2000 Pekerja 130,000.00 26,000.00
44,400.00 127,024.56 171,424.56

9 Menutup bubungan pada genteng metal sakura roof per m' - SK SNI T - 13 - 1993 - 03
2.500 Bh Bubungan 50,922.00 127,305.00
10.000 Bh Paku - -
0.004 M3 Kayu Lembasung/ sejenis 2,118,300.00 8,473.20
0.0100 Mandor 180,000.00 1,800.00
0.0100 Kepala tukang kayu 160,000.00 1,600.00
0.1000 Tukang kayu 150,000.00 15,000.00
0.2000 Pekerja 130,000.00 26,000.00
44,400.00 135,778.20 180,178.20

10 Pasang atap seng gelombang per 1 M 2


0.700 Lbr Seng gelombang 3 " x 6 " bjls 30 98,808.00 69,165.60
0.020 Kg Paku biasa 1/2 " - 1 " 30,000.00 600.00
0.120 Oh Pekerja 130,000.00 15,600.00
0.060 Oh Tukang kayu 150,000.00 9,000.00
0.006 Oh Kepala tukang 160,000.00 960.00
0.006 Oh Mandor 180,000.00 1,080.00
26,640.00 69,765.60 96,405.60

11 Pasang bubungan atap seng plat BJLS 30 per 1 M2


1.0000 M' Seng plat 3 " x 6 " bjls 30 46,506.00 46,506.00
0.0600 Kg Paku biasa 1/2 " - 1 " 30,000.00 1,800.00
0.0040 M3 Papan Lembasung/ Sejenis 2,118,300.00 8,473.20
0.0060 Oh Mandor 180,000.00 1,080.00
0.0250 Oh Kepala tukang kayu 160,000.00 4,000.00
0.2500 Oh Tukang kayu 150,000.00 37,500.00
0.1250 Oh Pekerja 130,000.00 16,250.00
58,830.00 56,779.20 115,609.20

12 Pasang aluminium foil / sisalation per 1 M2


1.050 M2 Sisalation / aluminium foil - -
0.150 Oh Pekerja 130,000.00 19,500.00
0.050 Oh Tukang 150,000.00 7,500.00
0.005 Oh Kepala tukang 160,000.00 800.00
0.008 Oh Mandor 180,000.00 1,440.00
29,240.00 - 29,240.00

IX. PEKERJAAN PENGECATAN

1. Mengikis / mengerok permukaan cat tembok lama 1 M2


0.050 Kg Soda api - -
0.150 Oh Pekerja 130,000.00 19,500.00
0.0025 Oh Mandor 180,000.00 450.00
19,950.00 - 19,950.00

2 Mencuci bidang permukaan tembok yang pernah di cat per 1 M2


0.050 Kg Sabun - -
0.150 Oh Pekerja 130,000.00 19,500.00
0.0025 Oh Mandor 180,000.00 450.00
19,950.00 - 19,950.00

3 Mengerok karat cat lama permukaan baja dengan cara manual per 1 m2
0.050 Kg Sabun - -
0.150 Oh Pekerja 130,000.00 19,500.00
0.0025 Oh Mandor 180,000.00 450.00
19,950.00 - 19,950.00

1 2 3.00 4.00 5.00 6.00

4 Mendempul dan menggosok kayu per 1 m2


0.080 Kg Dempul jadi 44,988.00 3,599.04
0.020 Kg Minyak cat 44,712.00 894.24
0.010 Kg Batu apung - -
0.040 Oh Pekerja 130,000.00 5,200.00
0.040 Oh Tukang cat 150,000.00 6,000.00
0.004 Oh Kepala tukang 160,000.00 640.00
0.0025 Oh Mandor 180,000.00 450.00
12,290.00 4,493.28 16,783.28

5 Pengecatan bidang kayu lama per 1 m2


0.150 Kg Plamir 44,988.00 6,748.20
0.170 Kg Cat dasar 50,922.00 8,656.74
0.170 Kg Cat penutup 50,922.00 8,656.74
0.070 Oh Pekerja 130,000.00 9,100.00
0.075 Oh Tukang cat 150,000.00 11,250.00
0.0075 Oh Kepala tukang 160,000.00 1,200.00
0.0025 Oh Mandor 180,000.00 450.00
22,000.00 24,061.68 46,061.68

6 Pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat penutup per 1 M2
0.200 Kg Cat meni 44,712.00 8,942.40
0.150 Kg Plamir 44,988.00 6,748.20
0.170 Kg Cat dasar 50,922.00 8,656.74
0.260 Kg Cat penutup 2 kali 50,922.00 13,239.72
0.070 Oh Pekerja 130,000.00 9,100.00
0.009 Oh Tukang cat 150,000.00 1,350.00
0.006 Oh Kepala tukang 160,000.00 960.00
0.0025 Oh Mandor 180,000.00 450.00
11,860.00 37,587.06 49,447.06

7 Pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar, 3 lapis cat penutup per 1 M2
0.200 Kg Cat meni 44,712.00 8,942.40
0.150 Kg Plamir 44,988.00 6,748.20
0.170 Kg Cat dasar 50,922.00 8,656.74
0.350 Kg Cat penutup 3 kali 50,922.00 17,822.70
0.070 Oh Pekerja 130,000.00 9,100.00
0.105 Oh Tukang cat 150,000.00 15,750.00
0.004 Oh Kepala tukang 160,000.00 640.00
0.0025 Oh Mandor 180,000.00 450.00
25,940.00 42,170.04 68,110.04

8 Pelaburan bidang kayu dengan teak oil per 1 M2


0.360 Ltr Teak oil 42,366.00 15,251.76
0.040 Oh Pekerja 130,000.00 5,200.00
0.063 Oh Tukang cat 150,000.00 9,450.00
0.063 Oh Kepala tukang 160,000.00 10,080.00
0.0025 Oh Mandor 180,000.00 450.00
25,180.00 15,251.76 40,431.76

9 Pelaburan bidang kayu dengan Pelitur per 1 M2


0.150 Ltr Pelitur - -
0.372 Ltr Pelitur jadi - -
2.000 Lbr Ampelas 8,694.00 17,388.00
0.060 Oh Tukang cat 150,000.00 9,000.00
0.016 Oh Kepala tukang 160,000.00 2,560.00
0.0025 Oh Mandor 180,000.00 450.00
12,010.00 17,388.00 29,398.00

10 Pelaburan bidang kayu dengan cat residu dan ter per 1 M2


0.350 Ltr Residu atau ter 14,076.00 4,926.60
0.100 Oh Pekerja 130,000.00 13,000.00
0.006 Oh Mandor 180,000.00 1,080.00
14,080.00 4,926.60 19,006.60

11 Pengecatan atap memakai cat khusus atap per m2


0.35 Kg Cat khusus 141,312.00 49,459.20
0.0167 Oh Pekerja 130,000.00 2,167.10
0.0050 Oh Tukang cat 150,000.00 750.00
0.0500 Oh Kepala tukang 160,000.00 8,000.00
0.0017 Oh Mandor 180,000.00 306.00
11,223.10 49,459.20 60,682.30

1 2 3.00 4.00 5.00 6.00

12 Pelaburan bidang kayu dengan vernis per 1 m2


0.150 Ltr Vernis - -
0.050 Kg Dempul 44,988.00 2,249.40
0.100 Lbr Ampelas 8,694.00 869.40
0.010 Bh Kuas 24,012.00 240.12
0.160 Oh Pekerja 130,000.00 20,800.00
0.160 Oh Tukang cat 150,000.00 24,000.00
0.016 Oh Kepala tukang 160,000.00 2,560.00
0.0025 Oh Mandor 180,000.00 450.00
47,810.00 3,358.92 51,168.92

13 Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup ) per 1 m2
0.100 Kg Plamir 44,988.00 4,498.80
0.100 Kg Cat dasar 50,922.00 5,092.20
0.260 Kg Cat penutup 2 X Cat Catylac 38,916.00 10,118.16
0.020 Oh Pekerja 130,000.00 2,600.00
0.063 Oh Tukang cat 150,000.00 9,450.00
0.0063 Oh Kepala tukang 160,000.00 1,008.00
0.0025 Oh Mandor 180,000.00 450.00
13,508.00 19,709.16 33,217.16

14 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup ) per 1 m2
0.120 Kg Cat dasar 50,922.00 6,110.64
0.180 Kg Cat penutup 2 X Cat Catylac 38,916.00 7,004.88
0.028 Oh Pekerja 130,000.00 3,640.00
0.042 Oh Tukang cat 150,000.00 6,300.00
0.0042 Oh Kepala tukang 160,000.00 672.00
0.0025 Oh Mandor 180,000.00 450.00
11,062.00 13,115.52 24,177.52

15 Pemasangan wall paper per 1 m2


1.200 M2 Wall paper - -
0.200 Kg Perekat - -
0.020 Oh Pekerja 130,000.00 2,600.00
0.200 Oh Tukang cat 150,000.00 30,000.00
0.002 Oh Kepala tukang 160,000.00 320.00
0.0025 Oh Mandor 180,000.00 450.00
33,370.00 - 33,370.00

16 Pengecatan permukaan baja dengan meni besi per 1 M2


0.100 Kg Meni besi 44,712.00 4,471.20
0.010 Bh Kuas 24,012.00 240.12
0.020 Oh Pekerja 130,000.00 2,600.00
0.200 Oh Tukang cat 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.010 Oh Mandor 180,000.00 1,800.00
37,600.00 4,711.32 42,311.32

17 Pengecatan permukaan baja dengan meni besi dan perancah per 1 M2


0.100 Kg Meni besi 44,712.00 4,471.20
0.010 Bh Kuas 24,012.00 240.12
0.002 M3 Perancah kayu 1,350,000.00 2,700.00
0.250 Oh Pekerja 130,000.00 32,500.00
0.225 Oh Tukang cat 150,000.00 33,750.00
0.0225 Oh Kepala tukang 160,000.00 3,600.00
0.0075 Oh Mandor 180,000.00 1,350.00
71,200.00 7,411.32 78,611.32

X PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Pasang lantai ubin pc abu - abu ukuran 20 x 20 cm per 1 m2


26.500 Bh Ubin abu - abu 20 x 20 cm - -
10.400 Kg Semen portland 2,500.00 26,000.00
0.0135 M3 Pasir pasang 200,000.00 2,700.00
0.270 Oh Pekerja 130,000.00 35,100.00
0.130 Oh Tukang batu 150,000.00 19,500.00
0.013 Oh Kepala tukang 160,000.00 2,080.00
0.0135 Oh Mandor 180,000.00 2,430.00
59,110.00 28,700.00 87,810.00

1 2 3.00 4.00 5.00 6.00

2 Pasang lantai ubin warna ukuran 20 x 20 cm per 1 M2


26.500 Bh Ubin warna 20 x 20 cm - -
8.760 Kg Semen portland 2,500.00 21,900.00
0.023 M3 Pasir pasang 200,000.00 4,600.00
0.900 Kg semen warna 27,738.00 24,964.20
0.270 Oh Pekerja 130,000.00 35,100.00
0.130 Oh Tukang batu 150,000.00 19,500.00
0.013 Oh Kepala tukang 160,000.00 2,080.00
0.0135 Oh Mandor 180,000.00 2,430.00
59,110.00 51,464.20 110,574.20

3 Pasang lantai ubin granito ukuran 40 x 40 cm per 1 m2


1.000 M2 Granit tile Esenza Standar - -
9.800 Kg Semen portland 2,500.00 24,500.00
0.0215 M3 Pasir pasang 200,000.00 4,300.00
1.300 Kg Semen warna 27,738.00 36,059.40
0.250 Oh Pekerja 130,000.00 32,500.00
0.120 Oh Tukang batu 150,000.00 18,000.00
0.012 Oh Kepala tukang 160,000.00 1,920.00
0.0125 Oh Mandor 180,000.00 2,250.00
54,670.00 64,859.40 119,529.40

4 Pasang lantai ubin granito ukuran 30 x 30 cm per 1 m2


1.000 M2 Granit tile Esenza Standar - -
10.000 Kg Semen portland 2,500.00 25,000.00
0.0215 M3 Pasir pasang 200,000.00 4,300.00
1.500 Kg Semen warna 27,738.00 41,607.00
0.260 Oh Pekerja 130,000.00 33,800.00
0.125 Oh Tukang batu 150,000.00 18,750.00
0.0125 Oh Kepala tukang 160,000.00 2,000.00
0.013 Oh Mandor 180,000.00 2,340.00
56,890.00 70,907.00 127,797.00

5 Pasang plint ubin PC abu - abu ukuran 15 x20 cm per 1 M'


5.300 Bh Plint ubin 15 x 20 cm - -
1.560 Kg Semen portland 2,500.00 3,900.00
0.004 M3 Pasir pasang 200,000.00 800.00
0.060 Oh Pekerja 130,000.00 7,800.00
0.030 Oh Tukang batu 150,000.00 4,500.00
0.003 Oh Kepala tukang 160,000.00 480.00
0.003 Oh Mandor 180,000.00 540.00
13,320.00 4,700.00 18,020.00

6 Pasang plint ubin PC warna ukuran 10 x20 cm per 1 M'


5.300 Bh Plint ubin warna 10 x 20 cm - -
1.200 Kg Semen portland 2,500.00 3,000.00
0.003 M3 Pasir pasang 200,000.00 600.00
0.190 Kg Semen warna 27,738.00 5,270.22
0.060 Oh Pekerja 130,000.00 7,800.00
0.030 Oh Tukang batu 150,000.00 4,500.00
0.003 Oh Kepala tukang 160,000.00 480.00
0.003 Oh Mandor 180,000.00 540.00
13,320.00 8,870.22 22,190.22

7 Pasang plint ubin granito ukuran 10 x30 cm per 1 M'


3.330 Bh Plint ubin granito 10 x 30 cm - -
1.650 Kg Semen portland 2,500.00 4,125.00
0.0032 M3 Pasir pasang 200,000.00 640.00
0.100 Kg Semen warna 27,738.00 2,773.80
0.060 Oh Pekerja 130,000.00 7,800.00
0.030 Oh Tukang batu 150,000.00 4,500.00
0.003 Oh Kepala tukang 160,000.00 480.00
0.0030 Oh Mandor 180,000.00 540.00
13,320.00 7,538.80 20,858.80

1 2 3.00 4.00 5.00 6.00

8 Pasang keramik 30 x 30 cm, per 1 M2


1.000 M2 Keramik 30 x 30 cm 96,048.00 96,048.00
14.150 Kg Semen portland 2,500.00 35,375.00
0.039 M3 Pasir pasang 200,000.00 7,800.00
2.000 Kg Semen warna 27,738.00 55,476.00
0.620 Oh Pekerja 130,000.00 80,600.00
0.350 Oh Tukang batu 150,000.00 52,500.00
0.035 Oh Kepala tukang 160,000.00 5,600.00
0.030 Oh Mandor 180,000.00 5,400.00
144,100.00 194,699.00 338,799.00

15 Pasang lantai keramik 20 x 20 cm per 1 M2


1.000 M2 Ubin keramik 20 x 20 cm 92,322.00 92,322.00
11.380 Kg Semen portland 2,500.00 28,450.00
0.042 M3 Pasir pasang 200,000.00 8,400.00
1.500 Kg Semen warna 27,738.00 41,607.00
0.620 Oh Pekerja 130,000.00 80,600.00
0.350 Oh Tukang batu 150,000.00 52,500.00
0.035 Oh Kepala tukang 160,000.00 5,600.00
0.030 Oh Mandor 180,000.00 5,400.00
144,100.00 170,779.00 314,879.00

16 Pasang lantai keramik 25 x 25 cm per 1 M2


1.000 M2 Ubin keramik 25 x 25 cm 96,048.00 96,048.00
11.380 Kg Semen portland 2,500.00 28,450.00
0.042 M3 Pasir pasang 200,000.00 8,400.00
1.500 Kg Semen warna 27,738.00 41,607.00
0.620 Oh Pekerja 130,000.00 80,600.00
0.350 Oh Tukang batu 150,000.00 52,500.00
0.035 Oh Kepala tukang 160,000.00 5,600.00
0.030 Oh Mandor 180,000.00 5,400.00
144,100.00 174,505.00 318,605.00

17 Pasang lantai keramik 33 x 33 cm per 1 M2


1.000 M2 Ubin keramik 33 x 33 cm 96,048.00 96,048.00
11.380 Kg Semen portland 2,500.00 28,450.00
0.042 M3 Pasir pasang 200,000.00 8,400.00
1.500 Kg Semen warna 27,738.00 41,607.00
0.620 Oh Pekerja 130,000.00 80,600.00
0.350 Oh Tukang batu 150,000.00 52,500.00
0.035 Oh Kepala tukang 160,000.00 5,600.00
0.030 Oh Mandor 180,000.00 5,400.00
144,100.00 174,505.00 318,605.00

18 Pasang lantai keramik 33 x 33 cm anti slip per 1 M2


1.000 M2 Ubin keramik 33 x 33 cm anti slip 96,048.00 96,048.00
11.380 Kg Semen portland 2,500.00 28,450.00
0.042 M3 Pasir pasang 200,000.00 8,400.00
1.500 Kg Semen warna 27,738.00 41,607.00
0.620 Oh Pekerja 130,000.00 80,600.00
0.350 Oh Tukang batu 150,000.00 52,500.00
0.035 Oh Kepala tukang 160,000.00 5,600.00
0.030 Oh Mandor 180,000.00 5,400.00
144,100.00 174,505.00 318,605.00

19 Pasang lantai mosaik 30 x 30 cm,ex lokal per 1 M2


1.000 M2 Mosaik 30 x 30 cm 158,562.00 158,562.00
14.150 Kg Semen portland 2,500.00 35,375.00
0.039 M3 Pasir pasang 200,000.00 7,800.00
2.000 Kg Semen warna 27,738.00 55,476.00
0.620 Oh Pekerja 130,000.00 80,600.00
0.350 Oh Tukang batu 150,000.00 52,500.00
0.035 Oh Kepala tukang 160,000.00 5,600.00
0.030 Oh Mandor 180,000.00 5,400.00
144,100.00 257,213.00 401,313.00
1 2 3.00 4.00 5.00 6.00

20 Pasang lantai marmer bandung 40 x 40 x 2 per 1 M2


1.000 M2 Marmer - -
14.15 Kg Semen portland 2,500.00 35,375.00
0.039 M3 Pasir pasang 200,000.00 7,800.00
2.000 Kg Semen warna 27,738.00 55,476.00
0.620 Oh Pekerja 130,000.00 80,600.00
0.350 Oh Tukang batu 150,000.00 52,500.00
0.035 Oh Kepala tukang 160,000.00 5,600.00
0.030 Oh Mandor 180,000.00 5,400.00
144,100.00 98,651.00 242,751.00

21 Pasang lantai parquet jati per 1 M2


1.050 M2 Parquet jati - -
0.60 Kg Lem vinyl - -
0.650 Oh Pekerja 130,000.00 84,500.00
0.350 Oh Tukang 150,000.00 52,500.00
0.035 Oh Kepala tukang 160,000.00 5,600.00
0.0325 Oh Mandor 180,000.00 5,850.00
148,450.00 - 148,450.00

22 Pasang dinding porselin 11 x 11 cm, putih per 1 M2


1.000 M2 Porselin 11 x 11 cm - -
9.300 Kg Semen abu - abu - -
0.018 M3 Pasir pasang 200,000.00 3,600.00
1.500 Kg Semen warna 27,738.00 41,607.00
0.620 Oh Pekerja 130,000.00 80,600.00
0.500 Oh Tukang batu 150,000.00 75,000.00
0.050 Oh Kepala tukang 160,000.00 8,000.00
0.030 Oh Mandor 180,000.00 5,400.00
169,000.00 45,207.00 214,207.00

23 Pasang dinding porselin 11 x 11 cm, warna per 1 M2


1.000 M2 Porselin 11 x 11 cm warna - -
9.300 Kg Semen abu - abu - -
0.018 M3 Pasir pasang 200,000.00 3,600.00
1.500 Kg Semen warna 27,738.00 41,607.00
0.620 Oh Pekerja 130,000.00 80,600.00
0.500 Oh Tukang batu 150,000.00 75,000.00
0.050 Oh Kepala tukang 160,000.00 8,000.00
0.030 Oh Mandor 180,000.00 5,400.00
169,000.00 45,207.00 214,207.00

24 Pasang dinding keramik 20 x 20 cm per 1 M2


1.000 M2 Keramik 20 x 20 cm 92,322.00 92,322.00
9.300 Kg Semen abu - abu 27,738.00 257,963.40
0.018 M3 Pasir pasang 200,000.00 3,600.00
1.500 Kg Semen warna 27,738.00 41,607.00
0.600 Oh Pekerja 130,000.00 78,000.00
0.100 Oh Tukang batu 150,000.00 15,000.00
0.045 Oh Kepala tukang 160,000.00 7,200.00
0.030 Oh Mandor 180,000.00 5,400.00
105,600.00 395,492.40 501,092.40

25 Pasang dinding bata pelapis 7 x 3 x 24 cm per 1 M2


60.000 Bh Bata pelapis dinding - -
12.440 Kg Semen abu - abu 27,738.00 345,060.72
0.025 M3 Pasir pasang 200,000.00 5,000.00
0.650 Oh Pekerja 130,000.00 84,500.00
0.500 Oh Tukang batu 150,000.00 75,000.00
0.050 Oh Kepala tukang 160,000.00 8,000.00
0.030 Oh Mandor 180,000.00 5,400.00
172,900.00 350,060.72 522,960.72

26 Pasang dinding batu palimanan per 1 M2


1.050 M2 Batu Palimanan - -
11.750 Kg Semen abu - abu 27,738.00 325,921.50
0.035 M3 Pasir pasang 200,000.00 7,000.00
0.620 Oh Pekerja 130,000.00 80,600.00
0.350 Oh Tukang batu 150,000.00 52,500.00
0.035 Oh Kepala tukang 160,000.00 5,600.00
0.030 Oh Mandor 180,000.00 5,400.00
144,100.00 332,921.50 477,021.50

1 2 3.00 4.00 5.00 6.00

27 Pasang Plint kayu 2 x 10 cm per 1 M'


0.0024 M3 Kayu - -
0.0500 Kg Paku - -
0.1200 Oh Pekerja 130,000.00 15,600.00
0.1200 Oh Tukang batu 150,000.00 18,000.00
0.0120 Oh Kepala tukang 160,000.00 1,920.00
0.0060 Oh Mandor 180,000.00 1,080.00
36,600.00 - 36,600.00

XI PEKERJAAN LANGIT-LANGIT ( SNI 03-2838-2002 )

1 Langit - langit plywood ( 30 x 60 ) cm, tebal 4 mm per 1 M2


0.360 Lbr Plywood 4' x 8' x 4 mm 92,322.00 33,235.92
0.030 Kg Paku 30,000.00 900.00
0.070 Oh Pekerja 130,000.00 9,100.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.0035 Oh Mandor 180,000.00 630.00
26,330.00 34,135.92 60,465.92

2 Langit - langit plywood ( 30 x 60 ) cm, tebal 6 mm per 1 M2


0.360 Lbr Plywood 4' x 8' x 6 mm 190,302.00 68,508.72
0.030 Kg Paku 30,000.00 900.00
0.070 Oh Pekerja 130,000.00 9,100.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.0035 Oh Mandor 180,000.00 630.00
26,330.00 69,408.72 95,738.72

3 Langit - langit plywood ( 60 x 120 ) cm,tebal 4 mm per 1 M2


0.375 Lbr Plywood 4' x 8' x 4 mm 92,322.00 34,620.75
0.030 Kg Paku 30,000.00 900.00
0.070 Oh Pekerja 130,000.00 9,100.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.0035 Oh Mandor 180,000.00 630.00
26,330.00 35,520.75 61,850.75

4 Langit - langit plywood ( 60 x 120 ) cm,tebal 6 mm per 1 M2


0.375 Lbr Plywood 4' x 8' x 6 mm 190,302.00 71,363.25
0.030 Kg Paku 30,000.00 900.00
0.070 Oh Pekerja 130,000.00 9,100.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.0035 Oh Mandor 180,000.00 630.00
26,330.00 72,263.25 98,593.25

5 Langit - langit teakwood ( 60 x 120 ) cm, tebal 4 mm per 1 M2


0.375 Lbr Teakwood 4' x 8 ' x 4 ' 92,322.00 34,620.75
0.030 Kg Paku 30,000.00 900.00
0.070 Oh Pekerja 130,000.00 9,100.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.0035 Oh Mandor 180,000.00 630.00
26,330.00 35,520.75 61,850.75
6 Langit-langit kayu meranti per 1 M2
0.024 M3 Kayu meranti papan 1,700,000.00 40,800.00
0.010 Kg Paku 30,000.00 300.00
0.050 Kg Paku sekrup 30,000.00 1,500.00
0.200 Oh Pekerja 130,000.00 26,000.00
0.600 Oh Tukang kayu 150,000.00 90,000.00
0.060 Oh Kepala tukang 160,000.00 9,600.00
0.010 Oh Mandor 180,000.00 1,800.00
127,400.00 42,600.00 170,000.00

1 2 3.00 4.00 5.00 6.00

7 List Langit - langit kayu profil per 1 M'


1.100 M' List kayu profil 13,524.00 14,876.40
0.010 Kg Paku 30,000.00 300.00
0.050 Oh Pekerja 130,000.00 6,500.00
0.050 Oh Tukang kayu 150,000.00 7,500.00
0.005 Oh Kepala tukang 160,000.00 800.00
0.003 Oh Mandor 180,000.00 540.00
15,340.00 15,176.40 30,516.40

8 Langit - langit ply wood 4 mm + rangka kayu per 1 M2


0.023 M3 Kayu 1,700,000.00 39,100.00
0.060 Kg Paku biasa 2 " - 5 " 30,000.00 1,800.00
0.390 Lbr Plywood 4' x 8' x 4 mm 92,322.00 36,005.58
0.270 Oh Pekerja 130,000.00 35,100.00
0.400 Oh Tukang kayu 150,000.00 60,000.00
0.040 Oh Kepala tukang 160,000.00 6,400.00
0.0135 Oh Mandor 180,000.00 2,430.00
103,930.00 76,905.58 180,835.58

9 Langit - langit gypsum, tebal 9 mm per 1 M2


0.364 Lbr Gypsum Board ( 120 x 240 x 9 ) mm - -
0.110 Kg Paku Sekrup - -
0.100 Oh Pekerja 130,000.00 13,000.00
0.050 Oh Tukang kayu 150,000.00 7,500.00
0.005 Oh Kepala tukang 160,000.00 800.00
0.005 Oh Mandor 180,000.00 900.00
22,200.00 - 22,200.00

XII PEKERJAAN KUNCI DAN KACA

1 Pasang kunci tanam YALE ITALI 1 buah


1.000 Bh Kunci tanam YALE ITALI 384,192.00 384,192.00
0.060 Oh Pekerja 130,000.00 7,800.00
0.600 Oh Tukang kayu 150,000.00 90,000.00
0.060 Oh Kepala tukang 160,000.00 9,600.00
0.003 Oh Mandor 180,000.00 540.00
107,940.00 384,192.00 492,132.00

2 Pasang kunci tanam biasa 1 buah


1.000 Bh Kunci tanam kuda terbang 144,070.00 144,070.00
0.010 Oh Pekerja 130,000.00 1,300.00
0.500 Oh Tukang kayu 150,000.00 75,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.005 Oh Mandor 180,000.00 900.00
78,800.00 144,070.00 222,870.00

3 Pasang kunci tanam kamar mandi 1 buah


1.000 Bh Kunci tanam kamar mandi 86,526.00 86,526.00
0.005 Oh Pekerja 130,000.00 650.00
0.500 Oh Tukang kayu 150,000.00 75,000.00
0.005 Oh Kepala tukang 160,000.00 800.00
0.0025 Oh Mandor 180,000.00 450.00
76,900.00 86,526.00 163,426.00
4 Pasang kunci silender 1 buah
1.000 Bh Kunci silender 222,870.00 222,870.00
0.005 Oh Pekerja 130,000.00 650.00
0.500 Oh Tukang kayu 150,000.00 75,000.00
0.005 Oh Kepala tukang 160,000.00 800.00
0.00025 Oh Mandor 180,000.00 45.00
76,495.00 222,870.00 299,365.00
5 Pasang engsel pintu 1 buah
1.000 Bh Engsel pintu 13,524.00 13,524.00
0.015 Oh Pekerja 130,000.00 1,950.00
0.150 Oh Tukang kayu 150,000.00 22,500.00
0.015 Oh Kepala tukang 160,000.00 2,400.00
0.00075 Oh Mandor 180,000.00 135.00
26,985.00 13,524.00 40,509.00

1 2 3.00 4.00 5.00 6.00

6 Pasang engsel jendela kupu - kupu 1 buah


1.000 Bh Engsel jendela 13,524.00 13,524.00
0.010 Oh Pekerja 130,000.00 1,300.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.0005 Oh Mandor 180,000.00 90.00
17,990.00 13,524.00 31,514.00

7 Pasang engsel angin 1 buah


1.000 Bh Engsel angin 13,524.00 13,524.00
0.020 Oh Pekerja 130,000.00 2,600.00
0.200 Oh Tukang kayu 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.010 Oh Mandor 180,000.00 1,800.00
37,600.00 13,524.00 51,124.00

8 Pasang spring knip 1 buah


1.000 Bh Spring knip - -
0.015 Oh Pekerja 130,000.00 1,950.00
0.150 Oh Tukang kayu 150,000.00 22,500.00
0.015 Oh Kepala tukang 160,000.00 2,400.00
0.00075 Oh Mandor 180,000.00 135.00
26,985.00 - 26,985.00

9 Pasang kait angin 1 buah


1.000 Bh Kait angin 5,796.00 5,796.00
0.015 Oh Pekerja 130,000.00 1,950.00
0.150 Oh Tukang kayu 150,000.00 22,500.00
0.015 Oh Kepala tukang 160,000.00 2,400.00
0.00075 Oh Mandor 180,000.00 135.00
26,985.00 5,796.00 32,781.00

10 Pasang door closer 1 buah


1.000 Bh Door closer 196,650.00 196,650.00
0.050 Oh Pekerja 130,000.00 6,500.00
0.500 Oh Tukang kayu 150,000.00 75,000.00
0.050 Oh Kepala tukang 160,000.00 8,000.00
0.0025 Oh Mandor 180,000.00 450.00
89,950.00 196,650.00 286,600.00

11 Pasang kunci selot 1 buah


1.000 Bh Kunci selot - -
0.020 Oh Pekerja 130,000.00 2,600.00
0.200 Oh Tukang kayu 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.001 Oh Mandor 180,000.00 180.00
35,980.00 - 35,980.00

12 Pasang pegangan pintu / door holder 1 buah


1.000 Bh Door holder - -
0.050 Oh Pekerja 130,000.00 6,500.00
0.500 Oh Tukang kayu 150,000.00 75,000.00
0.050 Oh Kepala tukang 160,000.00 8,000.00
0.0025 Oh Mandor 180,000.00 450.00
89,950.00 - 89,950.00
13 Pasang rel pintu dorong 1 buah
1.000 Bh Rel pintu dorong (5 m') - -
0.060 Oh Pekerja 130,000.00 7,800.00
0.600 Oh Tukang kayu 150,000.00 90,000.00
0.060 Oh Kepala tukang 160,000.00 9,600.00
0.003 Oh Mandor 180,000.00 540.00
107,940.00 - 107,940.00
14 Pasang kunci lemari 1 buah
1.000 Bh Kunci lemari - -
0.025 Oh Pekerja 130,000.00 3,250.00
0.250 Oh Tukang kayu 150,000.00 37,500.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.00125 Oh Mandor 180,000.00 225.00
44,975.00 - 44,975.00

1 2 3.00 4.00 5.00 6.00

15 Pasang kaca polos , tebal 3 mm per 1 M2


1.100 M2 Kaca 152,776.00 168,053.60
0.015 Oh Pekerja 130,000.00 1,950.00
0.150 Oh Tukang kayu 150,000.00 22,500.00
0.015 Oh Kepala tukang 160,000.00 2,400.00
0.00075 Oh Mandor 180,000.00 135.00
26,985.00 168,053.60 195,038.60

16 Pasang kaca polos , tebal 5 mm per 1 M2


1.100 M2 Kaca 232,530.00 255,783.00
0.015 Oh Pekerja 130,000.00 1,950.00
0.150 Oh Tukang kayu 150,000.00 22,500.00
0.015 Oh Kepala tukang 160,000.00 2,400.00
0.00075 Oh Mandor 180,000.00 135.00
25,035.00 257,733.00 282,768.00

17 Pasang kaca rayben, tebal 5 mm per 1 M2


1.100 M2 Kaca rayben 230,460.00 253,506.00
0.015 Oh Pekerja 130,000.00 1,950.00
0.150 Oh Tukang kayu 150,000.00 22,500.00
0.015 Oh Kepala tukang 160,000.00 2,400.00
0.00075 Oh Mandor 180,000.00 135.00
26,985.00 253,506.00 280,491.00

18 Pasang kaca buram, tebal 5 mm per 1 M2


1.100 M2 Kaca buram 5 mm 284,280.00 312,708.00
0.050 Kg Sealent -
0.025 Oh Pekerja 130,000.00 3,250.00
0.250 Oh Tukang kayu 150,000.00 37,500.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.00125 Oh Mandor 180,000.00 225.00
44,975.00 312,708.00 357,683.00

19 Pasang kaca cermin, tebal 5 mm per 1 M2


1.100 M2 Kaca cermin 369,840.00 406,824.00
0.015 Oh Pekerja 130,000.00 1,950.00
0.150 Oh Tukang kayu 150,000.00 22,500.00
0.015 Oh Kepala tukang 160,000.00 2,400.00
0.00075 Oh Mandor 180,000.00 135.00
26,985.00 406,824.00 433,809.00

20 Pasang kaca patri lokal per 1 M2


1.100 M2 Kaca patri - -
0.015 Oh Pekerja 130,000.00 1,950.00
0.150 Oh Tukang kayu 150,000.00 22,500.00
0.015 Oh Kepala tukang 160,000.00 2,400.00
0.00075 Oh Mandor 180,000.00 135.00
26,985.00 - 26,985.00

XIII PEKERJAAN BESI DAN ALUMINIUM


1 Pasang rangka atap baja per 1 Kg
1.1000 Kg Besi profil WF - -
0.080 Kg Meni besi - -
0.006 Oh Tukang besi 150,000.00 900.00
0.060 Oh Pekerja 130,000.00 7,800.00
0.006 Oh Kepala tukang 160,000.00 960.00
0.0003 Oh Mandor 180,000.00 54.00
9,714.00 - 9,714.00

4 Pasang pintu lipat per 1 M2


1.000 M2 Pintu lipat (Varia) - -
1.050 Oh Tukang besi konstruksi 150,000.00 157,500.00
1.050 Oh Pekerja 130,000.00 136,500.00
0.105 Oh Kepala tukang 160,000.00 16,800.00
0.0052 Oh Mandor 180,000.00 936.00
311,736.00 - 311,736.00

1 2 3.00 4.00 5.00 6.00

5 Pasang pintu Sunscreen alluminium per 1 M2


1.000 M2 Sunscreen alluminium - -
0.800 Oh Tukang besi konstruksi 150,000.00 120,000.00
0.080 Oh Pekerja 130,000.00 10,400.00
0.080 Oh Kepala tukang 160,000.00 12,800.00
0.004 Oh Mandor 180,000.00 720.00
143,920.00 - 143,920.00

6 Pasang rolling door aluminium per 1 M2


1.000 M2 Roll door aluminium - -
1.500 Oh Tukang besi konstruksi 150,000.00 225,000.00
1.050 Oh Pekerja 130,000.00 136,500.00
0.105 Oh Kepala tukang 160,000.00 16,800.00
0.0052 Oh Mandor 180,000.00 936.00
379,236.00 - 379,236.00

7 Pasang pintu alluminium per 1 M2


1.000 M2 Pintu alluminium - -
1.050 Oh Tukang besi konstruksi 150,000.00 157,500.00
1.050 Oh Pekerja 130,000.00 136,500.00
0.105 Oh Kepala tukang 160,000.00 16,800.00
0.0052 Oh Mandor 180,000.00 936.00
311,736.00 - 311,736.00

8 Pasang terali besi per 1 M2


11.500 M' Besi strip 2 x 3 - -
1.200 Oh Tukang las 150,000.00 180,000.00
1.200 Oh Pekerja 130,000.00 156,000.00
0.012 Oh Kepala tukang 160,000.00 1,920.00
0.0006 Oh Mandor 180,000.00 108.00
338,028.00 - 338,028.00

9 Pasang kawat harmonika per 1 M2


1.100 M2 Kawat harmonika - -
0.020 Kg Paku biasa 1/2 " - 1 " - -
0.0018 M3 Kayu Lembasung, papan - -
0.100 Oh Pekerja 130,000.00 13,000.00
0.100 Oh Tukang kayu 150,000.00 15,000.00
0.010 Oh Kepala tukang 160,000.00 1,600.00
0.0005 Oh Mandor 180,000.00 90.00
29,690.00 - 29,690.00

10 Pasang jendela nako dan tralis per 1 M2


1.100 M2 Jendela nako - -
0.020 Kg Paku biasa 1/2 ' - 1 " atau skrup - -
0.025 M2 Besi strip - -
0.200 Oh Pekerja 130,000.00 26,000.00
0.200 Oh Tukang kayu 150,000.00 30,000.00
0.020 Oh Kepala tukang 160,000.00 3,200.00
0.001 Oh Mandor 180,000.00 180.00
59,380.00 - 59,380.00

11 Pasang talang datar, seng bjls 28 per 1 M'


1.100 M' Seng plat bjls 30 - -
0.015 Kg Paku biasa 1/2 " - 1 " - -
0.0096 M3 Kayu , papan - -
0.025 Kg Flincote / meni besi - -
0.150 Oh Pekerja 130,000.00 19,500.00
0.400 Oh Tukang kayu 150,000.00 60,000.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.00125 Oh Mandor 180,000.00 225.00
83,725.00 - 83,725.00

12 Pasang talang miring, seng bjls 28 per 1 M'


1.100 M' Seng plat bjls 30 - -
0.015 Kg Paku biasa 1/2 " - 1 " - -
0.019 M3 Kayu , papan - -
0.300 Kg Flincote / meni besi - -
0.040 Oh Pekerja 130,000.00 5,200.00
0.400 Oh Tukang kayu 150,000.00 60,000.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.00125 Oh Mandor 180,000.00 225.00
69,425.00 - 69,425.00

1 2 3.00 4.00 5.00 6.00

13 Pasang talang 1/2 lingkaran D- 10 cm, seng bjls 28 per 1 M '


1.100 Lbr Seng plat bjls 30 - -
0.100 Kg Paku biasa 1/2 " - 1 " - -
0.019 M3 Kayu , papan - -
0.500 Kg Besi strip - -
0.150 Oh Pekerja 130,000.00 19,500.00
0.250 Oh Tukang kayu 150,000.00 37,500.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.00125 Oh Mandor 180,000.00 225.00
61,225.00 - 61,225.00

14 Pasang talang 1/2 lingkaran D- 10 cm, seng bjls 24 per 1 M '


0.300 Lbr Seng plat bjls 30 - -
0.100 Kg Paku biasa 1/2 " - 1 " - -
0.019 M3 Kayu , papan - -
0.500 Kg Besi strip - -
0.150 Oh Pekerja 130,000.00 19,500.00
0.250 Oh Tukang kayu 150,000.00 37,500.00
0.025 Oh Kepala tukang 160,000.00 4,000.00
0.00125 Oh Mandor 180,000.00 225.00
61,225.00 - 61,225.00

15 Memasang talang U dari PVC per 10 m'


10.000 m Talang U dari PVC - -
10.000 Bh Klam U - -
0.150 Mandor 180,000.00 27,000.00
0.500 Kepala tukang kayu 160,000.00 80,000.00
5.000 Tukang kayu 150,000.00 750,000.00
3.000 Pekerja 130,000.00 390,000.00
1,247,000.00 - 1,247,000.00
Memasang talang tritisan per - m' 124,700.00 - 124,700.00

I PEMASANGAN PIPA
1 BATANG PEKERJAAN PENURUNAN DAN
PENYETELAN PIPA PVC / Batang ( 4 m )

1 PIPA DIAMETER 200 MM


0.027 Hk Mandor 180,000.00 4,860.00
0.333 Hk Tukang Pipa 150,000.00 49,950.00
0.200 Hk Pekerja 130,000.00 26,000.00
Alat Bantu -
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 80,810.00
2 PIPA DIAMETER 150 MM
0.020 Hk Mandor 180,000.00 3,600.00
0.250 Hk Tukang Pipa 150,000.00 37,500.00
0.150 Hk Pekerja 130,000.00 19,500.00
Alat Bantu -
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 60,600.00
3 PIPA DIAMETER 100 MM 4"
0.015 Hk Mandor 180,000.00 2,700.00
0.150 Hk Tukang Pipa 150,000.00 22,500.00
0.080 Hk Pekerja 130,000.00 10,400.00
Alat Bantu -
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 35,600.00

4 PIPA DIAMETER 75 MM 3"


0.010 Hk Mandor 180,000.00 1,800.00
0.012 Hk Tukang Pipa 150,000.00 1,800.00
0.080 Hk Pekerja 130,000.00 10,400.00
Alat Bantu -
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 14,000.00
5 PIPA DIAMETER 50 MM 2"
0.010 Hk Mandor 180,000.00 1,800.00
0.010 Hk Tukang Pipa 150,000.00 1,500.00
0.050 Hk Pekerja 130,000.00 6,500.00
Alat Bantu -
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 9,800.00

II. PEKERJAAN TANAH

1 Galian tanah biasa sedalam 1 meter per 1 M3


0.400 Oh Pekerja 130,000.00 52,000.00
0.040 Oh Mandor 180,000.00 7,200.00
59,200.00 59,200.00

2 Galian tanah biasa sedalam 2 meter per 1 M3


0.526 Oh Pekerja 130,000.00 68,380.00
0.052 Oh Mandor 180,000.00 9,360.00
77,740.00 77,740.00

3 Galian tanah biasa sedalam 3 meter per 1 M3


0.735 Oh Pekerja 130,000.00 95,550.00
0.073 Oh Mandor 180,000.00 13,140.00
108,690.00 108,690.00

4 Galian tanah keras sedalam 1 M per 1 M3


0.625 Oh Pekerja 130,000.00 81,250.00
0.062 Oh Mandor 180,000.00 11,160.00
92,410.00 92,410.00

5 Galian tanah cadas sedalam 1 Meter per 1 M3


1.250 Oh Pekerja 130,000.00 162,500.00
0.125 Oh Mandor 180,000.00 22,500.00
185,000.00 185,000.00

6 Galian tanah lumpur sedalam 1 Meter per 1M3


0.823 Oh Pekerja 130,000.00 106,990.00
0.083 Oh Mandor 180,000.00 14,940.00
121,930.00 121,930.00

7 Pembuangan tanah sejauh 150 meter per 1M3


0.516 Oh Pekerja 130,000.00 67,080.00
0.050 Oh Mandor 180,000.00 9,000.00
76,080.00 76,080.00
2 Urugan kembali per 1 M3
0.192 Oh Pekerja 130,000.00 24,960.00
0.019 Oh Mandor 180,000.00 3,420.00
28,380.00 28,380.00

2 Pemadatan tanah per 1 M3


0.500 Oh Pekerja 130,000.00 65,000.00
0.050 Oh Mandor 180,000.00 9,000.00
74,000.00 74,000.00

2 Urugan pasir per 1 M3


1.200 Oh Pasir urug 650,000.00 780,000.00
0.300 Oh Pekerja 130,000.00 39,000.00
0.010 Oh Mandor 180,000.00 1,800.00
40,800.00 780,000.00 820,800.00

3 Urugan tanah per 1 M3


1.200 Oh Tanah urug 55,000.00 66,000.00
0.250 Oh Pekerja 130,000.00 32,500.00
0.025 Oh Mandor 180,000.00 4,500.00
37,000.00 66,000.00 103,000.00
0.150 Hk Tukang Pipa 150,000.00 22,500.00
0.120 Hk Pekerja 130,000.00 15,600.00
Alat Bantu -
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 104,100.00

B.5 DIAMETER 50 MM
0.070 Hk Mandor 180,000.00 12,600.00
0.120 Hk Tukang Pipa 150,000.00 18,000.00
0.100 Hk Pekerja 130,000.00 13,000.00
Alat Bantu -
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 43,600.00

C PEMASANGAN PIPA DI BAWAH TANAH


1 2 3 4 5.00 6.00 7
Tampa Pasir

C.1 PIPA PVC DIAMETER 200 MM


2.550 m3 Galian Tanah 121,930.00 310,921.50 310,921.50
0.420 m3 Urugan Pasir 820,800.00 344,736.00
2.200 m3 Urugan Tanah dan Pemadatan 102,380.00 225,236.00 225,236.00
1.000 Batang Penurunan dan Penyetelan pipa 80,810.00 80,810.00 80,810.00
0.350 m3 Pembuangan sisa Tanah 76,080.00 26,628.00 26,628.00
Jumlah 988,331.50 643,595.50
Biaya Pemasangan Pipa / meter Jumlah 164,721.92 107,265.92

C.2 PIPA PVC DIAMETER 150 MM


2.550 m3 Galian Tanah 121,930.00 310,921.50
0.420 m3 Urugan Pasir 820,800.00 344,736.00
2.200 m3 Urugan Tanah dan Pemadatan 102,380.00 225,236.00
1.000 Batang Penurunan dan Penyetelan pipa 60,600.00 60,600.00
0.350 m3 Pembuangan sisa Tanah 76,080.00 26,628.00
Jumlah 968,121.50 623,385.50
Biaya Pemasangan Pipa / meter Jumlah 161,353.58 103,897.58

C.3 PIPA PVC DIAMETER 100 MM ( Ø 4" )


2.100 m3 Galian Tanah 121,930.00 256,053.00 ###
0.315 m3 Urugan Pasir -
1.785 m3 Urugan Tanah dan Pemadatan 102,380.00 182,748.30 ###
1.000 Batang Penurunan dan Penyetelan pipa 35,600.00 35,600.00 ###
0.315 m3 Pembuangan sisa Tanah 76,080.00 23,965.20 ###
Jumlah 498,366.50 498,366.50
###
Biaya Pemasangan Pipa / meter Jumlah 124,591.63 124,591.63
###

1 2 3 4 5.00 6.00 7

C.4 PIPA PVC DIAMETER 75 MM


1.580 m3 Galian Tanah 121,930.00 192,649.40
0.225 m3 Urugan Pasir - -
1.355 m3 Urugan Tanah dan Pemadatan 102,380.00 138,724.90
1.000 Batang Penurunan dan Penyetelan pipa 14,000.00 14,000.00
0.225 m3 Pembuangan sisa Tanah 76,080.00 17,118.00
Jumlah 362,492.30 362,492.30
###
Biaya Pemasangan Pipa / meter Jumlah 60,415.38 60,415.38

C.5 PIPA PVC DIAMETER 50 MM


1.125 m3 Galian Tanah 121,930.00 137,171.25
- 0.150 m3 Urugan Pasir - -
- 0.975 m3 Urugan Tanah dan Pemadatan 102,380.00 99,820.50
1.000 Batang Penurunan dan Penyetelan pipa 9,800.00 9,800.00
0.150 m3 Pembuangan sisa Tanah 76,080.00 11,412.00
Jumlah 258,203.75 258,203.75
Biaya Pemasangan Pipa / meter Jumlah 43,033.96 43,033.96

D PENYETELAN / PEMASANGAN FLANGE LAS

D.1 PEMASANGAN FLANGE LAS Ø 200 MM


0.100 Hk Tukang Las 150,000.00 15,000.00
0.200 Hk Pekerja 130,000.00 26,000.00
0.080 Hk Kepala Tukang Pipa 160,000.00 12,800.00
62.643 cm Pengelasan flange - -
Jumlah 53,800.00

D.2 PEMASANGAN FLANGE LAS Ø 150 MM


0.100 Hk Tukang Las 150,000.00 15,000.00
0.200 Hk Pekerja 130,000.00 26,000.00
0.080 Hk Kepala Tukang Pipa 160,000.00 12,800.00
47.100 cm Pengelasan flange - -
Jumlah 53,800.00

D.3 PEMASANGAN FLANGE LAS DIAMATER 100 MM


0.100 Hk Tukang Las 150,000.00 15,000.00
0.200 Hk Pekerja 130,000.00 26,000.00
0.080 Hk Kepala Tukang Pipa 160,000.00 12,800.00
31.400 cm Pengelasan flange - -
Jumlah 53,800.00

D.4 PEMASANGAN FLANGE LAS DIAMATER 75 MM


0.100 Hk Tukang Las 150,000.00 15,000.00
0.200 Hk Pekerja 130,000.00 26,000.00
0.080 Hk Kepala Tukang Pipa 160,000.00 12,800.00
23.580 cm Pengelasan flange - -
Jumlah 53,800.00

D.5 PEMASANGAN FLANGE LAS DIAMATER 50 MM


0.100 Hk Tukang Las 150,000.00 15,000.00
0.200 Hk Pekerja 130,000.00 26,000.00
0.080 Hk Kepala Tukang Pipa 160,000.00 12,800.00
15.700 m' Pengelasan flange - -
cm Jumlah 53,800.00
E PEMASANGAN TEE , REDUSCER, DOP, SOCKET, SPIGOT

E.1 PADA PIPA 200


1.0000 Buah Penyetelan - -
0.0680 m3 Blok Beton 1 : 3 : 5 1,511,800.00 102,802.40
0.1350 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 22,679.76
Jumlah 125,482.16
Tidak dengan Blok Beton 22,679.76

E.2 PADA PIPA 150


1.0000 Buah Penyetelan - -
0.0680 m3 Blok Beton 1 : 3 : 5 1,511,800.00 102,802.40
0.1350 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 22,679.76
Jumlah 125,482.16
Tidak dengan Blok Beton 22,679.76

1 2 3 4 5.00 6.00 7

E.3 PADA PIPA 100


1.0000 Buah Penyetelan 66,000.00 66,000.00
0.0450 m3 Blok Beton 1 : 3 : 5 1,511,800.00 68,031.00
0.1350 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 22,679.76
Jumlah 156,710.76
Tidak dengan Blok Beton 88,679.76

E.4 PADA PIPA 75


1.0000 Buah Penyetelan 104,100.00 104,100.00
0.0450 m3 Blok Beton 1 : 3 : 5 1,511,800.00 68,031.00
0.1350 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 22,679.76
Jumlah 194,810.76
Tidak dengan Blok Beton 126,779.76

E.5 PADA PIPA 50


1.0000 Buah Penyetelan 43,600.00 43,600.00
0.0450 m3 Blok Beton 1 : 3 : 5 1,511,800.00 68,031.00
0.1350 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 22,679.76
Jumlah 134,310.76
Tidak dengan Blok Beton 66,279.76

F PEMASANGAN ALL FLANGE TEE, REDUCER, SPIGOTE, SOKED, BEND

F.1 PADA PIPA 200


1.0000 Buah Penyetelan - -
0.1160 m3 Blok Beton 1 : 3 : 5 1,511,800.00 175,368.80
0.2400 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 40,319.57
Jumlah 215,688.37
Tidak dengan Blok Beton 40,319.57

F.2 PADA PIPA 150


1.0000 Buah Penyetelan - -
0.1160 m3 Blok Beton 1 : 3 : 5 1,511,800.00 175,368.80
0.2400 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 40,319.57
Jumlah 215,688.37
Tidak dengan Blok Beton 40,319.57

F.3 PADA PIPA 100


1.0000 Buah Penyetelan 66,000.00 66,000.00
0.0770 m3 Blok Beton 1 : 3 : 5 1,511,800.00 116,408.60
0.1600 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 26,879.71
Jumlah 209,288.31
Tidak dengan Blok Beton 92,879.71

F.4 PADA PIPA 75


1.0000 Buah Penyetelan 104,100.00 104,100.00
0.0770 m3 Blok Beton 1 : 3 : 5 1,511,800.00 116,408.60
0.1600 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 26,879.71
Jumlah 247,388.31
Tidak dengan Blok Beton 130,979.71

F.5 PADA PIPA 50


1.0000 Buah Penyetelan 43,600.00 43,600.00
0.0770 m3 Blok Beton 1 : 3 : 5 1,511,800.00 116,408.60
0.1600 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 26,879.71
Jumlah 186,888.31
Tidak dengan Blok Beton 70,479.71
1 2 3 4 5.00 6.00 7

G PEMASANGAN GATE VALVE, CECK VALVE,


WATER METER DAN SEJENISNYA

G.1 PADA DIAMETER PIPA 200 mm


1.215 m3 Galian Tanah 121,930.00 148,144.95
0.035 m3 Blok Beton 1 : 3 : 5 1,511,800.00 52,913.00
0.027 m3 Blok Penahan 1 : 3 : 5 1,511,800.00 40,818.60
0.080 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 13,439.86
0.712 m3 Urugan Tanah dan Pemadatan 102,380.00 72,894.56
1.000 Buah Penyambungan Gate Valve - -
1.000 Buah Penempatan Box Valve - -
1.000 m' Penempatan pipa dia. 200 mm 107,265.92 107,265.92
0.006 m3 Urugan Pasir 820,800.00 4,924.80
0.503 m3 Buangan Tanah 76,080.00 38,268.24
Jumlah 478,669.92

G.2 PADA DIAMETER PIPA 150 mm


1.215 m3 Galian Tanah 121,930.00 148,144.95
0.035 m3 Blok Beton 1 : 3 : 5 1,511,800.00 52,913.00
0.027 m3 Blok Penahan 1 : 3 : 5 1,511,800.00 40,818.60
0.080 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 13,439.86
0.712 m3 Urugan Tanah dan Pemadatan 102,380.00 72,894.56
1.000 Buah Penyambungan Gate Valve - -
1.000 Buah Penempatan Box Valve - -
1.000 m' Penempatan pipa dia. 150 mm 103,897.58 103,897.58
0.006 m3 Urugan Pasir 820,800.00 4,924.80
0.503 m3 Buangan Tanah 76,080.00 38,268.24
Jumlah 475,301.59

G.3 PADA DIAMETER PIPA 100 mm


1.215 m3 Galian Tanah 121,930.00 148,144.95
0.035 m3 Blok Beton 1 : 3 : 5 1,511,800.00 52,913.00
0.027 m3 Blok Penahan 1 : 3 : 5 1,511,800.00 40,818.60
0.080 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 13,439.86
0.712 m3 Urugan Tanah dan Pemadatan 102,380.00 72,894.56
1.000 Buah Penyambungan Gate Valve 66,000.00 66,000.00
1.000 Buah Penempatan Box Valve - -
1.000 m' Penempatan pipa dia. 100 mm 124,591.63 124,591.63
0.006 m3 Urugan Pasir 820,800.00 4,924.80
0.503 m3 Buangan Tanah 76,080.00 38,268.24
Jumlah 561,995.63

G.4 PADA DIAMETER PIPA 75 mm


1.215 m3 Galian Tanah 121,930.00 148,144.95
0.035 m3 Blok Beton 1 : 3 : 5 1,511,800.00 52,913.00
0.027 m3 Blok Penahan 1 : 3 : 5 1,511,800.00 40,818.60
0.080 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 13,439.86
0.712 m3 Urugan Tanah dan Pemadatan 102,380.00 72,894.56
1.000 Buah Penyambungan Gate Valve 104,100.00 104,100.00
1.000 Buah Penempatan Box Valve - -
1.000 m' Penempatan pipa dia. 75 mm 124,591.63 124,591.63
0.006 m3 Urugan Pasir 820,800.00 4,924.80
0.503 m3 Buangan Tanah 76,080.00 38,268.24
Jumlah 600,095.63

G.5 PADA DIAMETER PIPA 50 mm


1.215 m3 Galian Tanah 121,930.00 148,144.95
0.035 m3 Blok Beton 1 : 3 : 5 1,511,800.00 52,913.00
0.027 m3 Blok Penahan 1 : 3 : 5 1,511,800.00 40,818.60
0.080 m2 Bekisting ( Pasang + Bongkar ) 167,998.20 13,439.86
0.712 m3 Urugan Tanah dan Pemadatan 102,380.00 72,894.56
1.000 Buah Penyambungan Gate Valve 43,600.00 43,600.00
1.000 Buah Penempatan Box Valve - -
1.000 m' Penempatan pipa dia. 50 mm 43,033.96 43,033.96
0.006 m3 Urugan Pasir 820,800.00 4,924.80
0.503 m3 Buangan Tanah 76,080.00 38,268.24
Jumlah 458,037.96

1 2 3 4 5.00 6.00 7

H PEMASANGAN BEND 90º ; 45º ; 22.5º

H.1 PADA DIAMETER PIPA 200 MM


1.000 Buah Penyetelan - -
0.048 m3 Blok Beton 1 : 3 : 5 1,511,800.00 72,566.40
0.150 m2 Bekisting 167,998.20 25,199.73
Jumlah 97,766.13
Tidak dengan Blok Beton 25,199.73

H.2 PADA DIAMETER PIPA 150 MM


1.000 Buah Penyetelan - -
0.048 m3 Blok Beton 1 : 3 : 5 1,511,800.00 72,566.40
0.150 m2 Bekisting 167,998.20 25,199.73
Jumlah 97,766.13
Tidak dengan Blok Beton 25,199.73

H.3 PADA DIAMETER PIPA 100 MM


1.000 Buah Penyetelan 66,000.00 66,000.00
0.032 m3 Blok Beton 1 : 3 : 5 1,511,800.00 48,377.60
0.150 m2 Bekisting 167,998.20 25,199.73
Jumlah 139,577.33
Tidak dengan Blok Beton 91,199.73

H.4 PADA DIAMETER PIPA 75 MM


1.000 Buah Penyetelan 104,100.00 104,100.00
0.032 m3 Blok Beton 1 : 3 : 5 1,511,800.00 48,377.60
0.150 m2 Bekisting 167,998.20 25,199.73
Jumlah 177,677.33
Tidak dengan Blok Beton 129,299.73

H.5 PADA DIAMETER PIPA 50 MM


1.000 Buah Penyetelan 43,600.00 43,600.00
0.032 m3 Blok Beton 1 : 3 : 5 1,511,800.00 48,377.60
0.150 m2 Bekisting 167,998.20 25,199.73
Jumlah 117,177.33
Tidak dengan Blok Beton 68,799.73

I PEMBUATAN BOX VALVE

I.1 BOX VALVE PADA PIPA DIAMETER ≥ 50 MM


0.580 m3 Galian Tanah 121,930.00 70,719.40
0.058 m3 Blok Beton 1 : 3 : 5 1,511,800.00 87,684.40
0.310 m3 Urugan Pasir - -
0.516 m3 Urugan Tanah dan Pemadatan 102,380.00 52,828.08
1.000 Buah Tutup Box Street - -
Jumlah 211,231.88

J PEMBUATAN THRUST BLOK

J.1 PADA DIAMETER ≤ 100 MM


0.040 m3 Blok Beton 1 : 3 : 5 1,511,800.00 60,472.00
0.214 m2 Bekisting 167,998.20 35,951.61
Jumlah 96,423.61

J.2 PADA DIAMETER > 100 MM


0.100 m3 Blok Beton 1 : 3 : 5 1,511,800.00 151,180.00
0.300 m2 Bekisting 167,998.20 50,399.46
Jumlah 201,579.46

K PEMASANGAN PIPA DILUAR TANAH / METER

K.1 PIPA GI/STEEL Ø 200 MM


0.250 Hk Tukang pipa 150,000.00 37,500.00
0.085 Hk Pekerja 130,000.00 11,050.00
0.475 m2 Pengecatan pipa 2 x bidang besi 42,311.32 20,097.88
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 68,647.88

1 2 3 4 5.00 6.00 7

K.2 PIPA GI/STEEL Ø 150 MM


0.250 Hk Tukang pipa 150,000.00 37,500.00
0.085 Hk Pekerja 130,000.00 11,050.00
0.475 m2 Pengecatan pipa 2 x bidang besi 42,311.32 20,097.88
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 68,647.88

K.3 PIPA GI/STEEL Ø 100 MM


0.250 Hk Tukang pipa 150,000.00 37,500.00
0.065 Hk Pekerja 130,000.00 8,450.00
0.315 m2 Pengecatan pipa 2 x bidang besi 42,311.32 13,328.07
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 59,278.07

K.4 PIPA GI/STEEL Ø 75 MM


0.188 Hk Tukang pipa 150,000.00 28,200.00
0.042 Hk Pekerja 130,000.00 5,460.00
0.236 m2 Pengecatan pipa 2 x bidang besi 42,311.32 9,985.47
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 43,645.47

K.5 PIPA GI/STEEL Ø 50 MM


0.125 Hk Tukang pipa 150,000.00 18,750.00
0.042 Hk Pekerja 130,000.00 5,460.00
0.236 m2 Pengecatan pipa 2 x bidang besi 42,311.32 9,985.47
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 34,195.47

L PEMASANGAN ASSESORIES DILUAR TANAH

L.1 ACCESORIES (BEND, TEE, ) Ø 200MM GI


0.275 Hk Tukang pipa 150,000.00 41,250.00
0.095 Hk Pekerja 130,000.00 12,350.00
0.425 m2 Pengecatan pipa 2 x bidang besi 42,311.32 17,982.31
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 71,582.31

L.2 ACCESORIES (BEND, TEE, ) Ø 150MM GI


0.275 Hk Tukang pipa 150,000.00 41,250.00
0.095 Hk Pekerja 130,000.00 12,350.00
0.425 m2 Pengecatan pipa 2 x bidang besi 42,311.32 17,982.31
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 71,582.31

L.3 ACCESORIES (BEND, TEE, ) Ø 100 MM GI


0.275 Hk Tukang pipa 150,000.00 41,250.00
0.095 Hk Pekerja 130,000.00 12,350.00
0.425 m2 Pengecatan pipa 2 x bidang besi 42,311.32 17,982.31
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 71,582.31

L.4 ACCESORIES (BEND, TEE, ) Ø 75 MM GI


0.188 Hk Tukang pipa 150,000.00 28,200.00
0.065 Hk Pekerja 130,000.00 8,450.00
0.215 m2 Pengecatan pipa 2 x bidang besi 42,311.32 9,096.93
1.000 Ls Alat bantu - -
Jumlah 45,746.93

L.5 ACCESORIES (BEND, TEE) Ø 50 MM GI


0.125 Hk Tukang pipa 150,000.00 18,750.00
0.042 Hk Pekerja 130,000.00 5,460.00
0.140 m2 Pengecatan pipa 2 x bidang besi 42,311.32 5,923.58
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 30,133.58

1 2 3 4 5.00 6.00 7

ANP M PENGETESAN PIPA STEEL/PVC

M.1 PADA PIPA DIAMETER 200 MM PER 50 M


0.016 m2 Luas Penampang pipa 0.13 0.00
0.717 m3 Volume Air teoritis ( V = AL ) 6.50 4.66
2.008 m3 Volume Air terpakai ( Vt= 2,8 V ) 18.20 36.54
2.000 Hk Pekerja 180,000.00 360,000.00
0.750 Hk Mandor - -
1.000 Hk Sewa Alat 25,000.00 25,000.00
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 130,000.00 130,000.00
Jumlah 515,036.54
Biaya Pengetesan per meter Jumlah 10,300.73

M.2 PADA PIPA DIAMETER 150 MM PER 50 M


0.016 m2 Luas Penampang pipa 0.07 0.00
0.717 m3 Volume Air teoritis ( V = AL ) 3.53 2.53
2.008 m3 Volume Air terpakai ( Vt= 2,8 V ) 9.89 19.86
2.000 Hk Pekerja 130,000.00 260,000.00
0.750 Hk Mandor 180,000.00 135,000.00
1.000 Hk Sewa Alat 25,000.00 25,000.00
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 420,019.86
Biaya Pengetesan per meter Jumlah 8,400.40

M.3 PADA PIPA DIAMETER 100 MM PER 50 M


0.016 m2 Luas Penampang pipa 0.03 0.00
0.717 m3 Volume Air teoritis ( V = AL ) 1.57 1.13
2.008 m3 Volume Air terpakai ( Vt= 2,8 V ) 4.39 8.81
2.000 Hk Pekerja 130,000.00 260,000.00
0.750 Hk Mandor 180,000.00 135,000.00
1.000 Hk Sewa Alat 25,000.00 25,000.00
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 420,008.81
Biaya Pengetesan per meter Jumlah 8,400.18

M.4 PADA PIPA DIAMETER 75 MM PER 50 M


0.016 m2 Luas Penampang pipa 0.02 0.00
0.717 m3 Volume Air teoritis ( V = AL ) 0.88 0.63
2.008 m3 Volume Air terpakai ( Vt= 2,8 V ) 2.47 4.96
2.000 Hk Pekerja 130,000.00 260,000.00
0.750 Hk Mandor 180,000.00 135,000.00
1.000 Hk Sewa Alat 25,000.00 25,000.00
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 420,004.96
Biaya Pengetesan per meter Jumlah 8,400.10

M.5 PADA PIPA DIAMETER 50 MM PER 50 M


0.016 m2 Luas Penampang pipa 0.01 0.00
0.717 m3 Volume Air teoritis ( V = AL ) 0.39 0.28
2.008 m3 Volume Air terpakai ( Vt= 2,8 V ) 1.09 2.19
2.000 Hk Pekerja 130,000.00 260,000.00
0.750 Hk Mandor 180,000.00 135,000.00
1.000 Hk Sewa Alat 25,000.00 25,000.00
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 420,002.19
Biaya Pengetesan per meter Jumlah 8,400.04

N PENGURASAN & DESINFEKSI PIPA STEEL/PVC

N.1 PADA PIPA DIAMETER 200 MM PER 50 M


0.016 m2 Luas Penampang pipa 0.13 0.00
0.717 m3 Volume Air teoritis ( V = AL ) 6.50 4.66
2.008 m3 Volume Air terpakai ( Vt= 2,8 V ) 18.20 36.54
2.000 Hk Pekerja 180,000.00 360,000.00
0.750 Hk Mandor - -
1.000 Gr Pembubuhan Kaporit 25,000.00 25,000.00
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 130,000.00 130,000.00
Jumlah 515,041.20
Biaya Pengetesan per meter Jumlah 10,300.82

1 2 3 4 5.00 6.00 7

N.2 PADA PIPA DIAMETER 150 MM PER 50 M


0.016 m2 Luas Penampang pipa 0.07 0.00
0.717 m3 Volume Air teoritis ( V = AL ) 3.53 2.53
2.008 m3 Volume Air terpakai ( Vt= 2,8 V ) 9.89 19.86
2.000 Hk Pekerja 180,000.00 360,000.00
0.750 Hk Mandor - -
1.000 Gr Pembubuhan Kaporit 25,000.00 25,000.00
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 385,022.39
Biaya Pengetesan per meter Jumlah 7,700.45

N.3 PADA PIPA DIAMETER 100 MM PER 50 M


0.008 m2 Luas Penampang pipa 0.03 0.00
0.393 m3 Volume Air teoritis ( V = AL ) 1.57 0.62
1.100 m3 Volume Air terpakai ( Vt= 2,8 V ) 4.39 4.83
2.000 Hk Pekerja 180,000.00 360,000.00
0.700 Hk Mandor - -
1.000 Gr Pembubuhan Kaporit 25,000.00 25,000.00
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 385,004.83
Biaya Pengurasan per meter Jumlah 7,700.10

N.4 PADA PIPA DIAMETER 75 MM PER 50 M


0.004 m2 Luas Penampang pipa 0.02 0.00
0.221 m3 Volume Air teoritis ( V = AL ) 0.88 0.19
0.619 m3 Volume Air terpakai ( Vt= 2,8 V ) 2.47 1.53
2.000 Hk Pekerja 180,000.00 360,000.00
0.650 Hk Mandor - -
1.000 Gr Pembubuhan Kaporit 25,000.00 25,000.00
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 385,001.53
Biaya Pengurasan per meter Jumlah 7,700.03
N.5 PADA PIPA DIAMETER 50 MM PER 50 M

0.002 m2 Luas Penampang pipa 0.01 0.00


0.098 m3 Volume Air teoritis ( V = AL ) 0.39 0.04
0.274 m3 Volume Air terpakai ( Vt= 2,8 V ) 1.09 0.30
2.000 Hk Pekerja 180,000.00 360,000.00
0.600 Hk Mandor - -
1.000 Gr Pembubuhan Kaporit 25,000.00 25,000.00
1.000 Ls Alat Bantu X Ø Pipa(Cm) /100 - -
Jumlah 385,000.30
Biaya Pengurasan per meter Jumlah 7,700.01

O PEKERJAAN LAIN-LAIN
O.1 PEMASANGAN BAK HU / PAH FIBER GLASS KAP. 3 M3

0.720 Hk Tukang batu 150,000.00 108,000.00


0.072 Hk Kepala tukang batu 160,000.00 11,520.00
1.440 Hk Pekerja biasa 130,000.00 187,200.00
0.108 Hk Mandor - -
1.000 Ls Alat bantu - -
Biaya pemasangan 1 unit Jumlah 306,720.00

O.2 1 INC' PENGELASAN


0.0500 Kg Kawat Las 33,000.00 1,650.00
0.0500 Hk Tukang Las 150,000.00 7,500.00
0.0500 Hk Pekerja 130,000.00 6,500.00
0.0200 Kg Mandor - -
0.0830 Mesin Las 155,000.00 12,865.00
15,650.00 12,865.00 28,515.00

O.3 1 M' TIANG PIPA GIV / STEEL DIPANCANG KEDALAM TANAH SUNGAI
0.0400 Hk Tukang Pancang 150,000.00 6,000.00
0.0040 Hk Kepala Tukang Pancang 160,000.00 640.00
1.8000 Hk Pekerja 130,000.00 234,000.00
0.0430 Hk Mandor - -
0.0520 Oh Mesin Pancang 454,241.97 23,620.58
1.0000 Oh Alat Bantu - -
240,640.00 23,620.58 264,260.58

O.4 1 M' PEMANCANGAN PIPA BAJA Ø 150 mm

1.0000 m' Pipa Pancang 304,875.00 304,875.00


0.6500 Kg Plat Penyambung 6 mm 21,000.00 13,650.00
10.0000 Inc Las - Lasan 28,515.00 285,150.00
1.0000 m' Upah Pancang 264,260.58 264,260.58
867,935.58 867,935.58

Diperiksa Oleh Disusun oleh,


Kasubdin Cipta Karya
1. APOSTO LEWIRA, ST ( ) ###

2. RAHMI JAYANTI, ST ( ) ###


###
Ir.H.SASAN PEMMA, M.Ap 3. DIDI RUSDIANSYAH, ST ( ) ###
NIP. 550 013 348 ###
###

Diketahui/Disetujui oleh,
Kepala DPU Kabupaten Bulungan

H. ZAINAL ABIDIN, ST, M.Si


NIP. 550 006 548
1
16,767.00 1,863.00 71.43
1,056.00 0.01
71.43
0.04
1.00

69,444.44
500,000.00
6,944.44
4.36

530,097.70

6.72 336.000 6.72 232.000


0.540 0.520
0.780 0.780
0.05 1.650 1.650
0.250 0.250
0.025 0.025
0.080 0.080
661,713.40

400.000
0.480
0.800
2.000
0.350
0.035
1.000
plywood tebal 9mm 0.350

PLYWOOD T. 9MM 0.35

PLYWOOD T. 9MM 0.35


0.11
0.1704
0.104

0.1736
0.1736
1,045.00 4,514.40
104,500.00 1,672.00
35,200.00 8,800.00
41,800.00 4,180.00
48,400.00 484.00
55,000.00 825.00

14,289.00 6,186.40 20,475.40

Lantai Ulin
2,683,000.00

15000000
1,222,356.00

Pasangan lantai dari papan kayu ulin tebal 5 cm per m2 - BOW - F.37.b
0.0250 M3 Papan kayu ulin
0.2000 Kg Paku ulin
0.0140 Mandor
0.0800 Kepala tukang kayu
0.8000 Tukang kayu
0.2800 Pekerja

Apabila hanya diketam salah satu sisinya saja

8 12 1.5 0.1875
0.333333333333 0.09375
0.166666666667

4
50
200
Pasang kusen pintu dan jendela kayu ulin per 1 M3
1.200 M3 Kayu balok ulin
6.000 Oh Pekerja
18.000 Oh Tukang kayu
2.000 Oh Kepala tukang
0.300 Oh Mandor
323258.8
Menutup bubungan pada atap seng gelombang - SK SNI T - 13 - 1993 - 03
1.0000 M' Seng plat BJLS 30
0.0600 Kg Paku sekrup
0.0040 M3 Papan Lembasung/ Sejenis
0.0060 Mandor
0.0250 Kepala tukang kayu
0.2500 Tukang kayu

0.1250 Pekerja
20,972.70

27,907.90

14,536.50

21,283.60

7500
750
1000
2625
11875

55000
5500

#REF!

11000
1100
3850

18000

1800
6300
26100 5220
12,516.18

9,567.12

0.0250 Pek.
0.0075 Kepala Tk
0.0750 Tk Cat
0.0025 Mandor

12,273.50

22,709.00
0.283
0.2276
942500
1.89
0.529100529101
498677.2486772
0.05
643,595.50
20
70 0.333 0.004757142857143
2.5
2
0.08
3
4.5
0.075
0.00 -
0.00 -
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
6,000,000.00 7,200,000.00
130,000.00 780,000.00
150,000.00 2,700,000.00
160,000.00 320,000.00
180,000.00 54,000.00
3,854,000.00 7,200,000.00 11,054,000.00
K SNI T - 13 - 1993 - 03
RINCIAN KEBUTUHAN MATERIAL/BAHAN, ALAT & UPAH

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA DESA Dikerjakan dalam waktu 20 hari
PEKERJAAN : PEMBANGUNAN MENARA MESJID
SUMBER DANA : DD
LOKASI : DESA SESAYAP HILIR
VOLUME : 1 Menara
Volume
PPN 10% Pph 21
Uraian Dari Satuan Harga Satuan (Rp.) Jumlah (Rp.) Pph 22 = 1,5% (Rp.) Pph 23 = 2% (Rp.)
Total Dana Desa (Rp.) (Rp.)
Swadaya
1. BAHAN
1. Batu Pasir ( Sirtu ) 11.00 - 11.00 M3 Rp. 650,000.00.- Rp. 7,150,000.00.-
2. Pasir Pasang 4.00 - 4.00 M3 Rp. 210,000.00.- Rp. 840,000.00.-
3. Semen 86.00 - 86.00 Zax Rp. 120,000.00.- Rp. 10,320,000.00.-
4. Bataco 850.00 - 850.00 Bh Rp. 5,000.00.- Rp. 4,250,000.00.-
5. Besi Ø 8 25.00 - 25.00 Btg Rp. 95,000.00.- Rp. 2,375,000.00.-
6. Besi Ø 10 25.00 - 25.00 Btg Rp. 110,000.00.- Rp. 2,750,000.00.-
7. Besi Ø 12 23.00 - 23.00 Btg Rp. 150,000.00.- Rp. 3,450,000.00.-
8. Kawat 4.00 - 4.00 Kg Rp. 30,000.00.- Rp. 120,000.00.-
9. Balok Meranti 5 x 10 Cm + Biaya Angkut ( Begisting ) 0.04 - 0.04 M3 Rp. 2,700,000.00.- Rp. 108,000.00.-
10. Balok Meranti 5 x 5 Cm + Biaya Angkut ( Begisting ) 0.25 - 0.25 M3 Rp. 2,700,000.00.- Rp. 675,000.00.-
11. Triplek / Polywood ( Begisting ) 3.00 - 3.00 Lbr Rp. 95,000.00.- Rp. 285,000.00.-
12. Bondeck 3.00 - 3.00 Lbr Rp. 650,000.00.- Rp. 1,950,000.00.-
13. Backlayer ( Campuran Acian ) 8.00 - 8.00 Bungkus Rp. 50,000.00.- Rp. 400,000.00.-
14. Cat 6.00 - 6.00 Kg Rp. 80,000.00.- Rp. 480,000.00.-
15. Paku Biasa 3.00 - 3.00 Kg Rp. 30,000.00.- Rp. 90,000.00.-
16. Kubah 1.00 - 1.00 Bh Rp. 3,000,000.00.- Rp. 3,000,000.00.-

Sub Total 1) Rp. 38,243,000.00.-


2. ALAT

1. Sewa Skoof Polding 20.00 - 20.00 Set Rp. 50,000.00.- Rp. 1,000,000.00.-

Sub Total 2) Rp. 1,000,000.00.-


3. UPAH
1. Pekerja 4 Orang 80.00 - 80.00 HOK Rp. 130,000.00.- Rp. 10,400,000.00.-
2. Tukang 1 Orang 2.00 - 2.00 HOK Rp. 150,000.00.- Rp. 300,000.00.-

Sub Total 3) Rp. 10,700,000.00.-


4. OPERASIONAL TPK Maximal 5%
1. Operasional TPK (5 %) 1.00 1.00 Ls Rp. 2.500.000,00,-
Sub Total 4) Rp. 2,500,000.00.-
TOTAL JUMLAH (1+2+3) Rp. 52,443,000.00.-
TOTAL JUMLAH (Fisik + Ppn 10%+ PPh) Rp. 52,443,000.00.-

Sesayap Hilir, .... ........ 2021

Diketahui Oleh Diverifikasi Oleh Dibuat Oleh


Kepala Desa Sesayap Sekretaris Desa Sesayap Kaur Perencanaan

………………………… ……………………… ………………………….


Back Data

Lebar Panjang Tinggi Jumlah Titik


Kolom 0.3 0.3 3.5 4

Pasir Batu ( Sirtu )


Semen
Besi Ø 12 3 4
Besi Ø 8 2.25 4
Kawat

Sloof 0.3 4 0.5 4


Pasir Batu ( Sirtu )
Semen
Besi Ø 12 2.75 4
Besi Ø 8 2 4
Kawat

Dudukan Kubah
Pasir Batu ( Sirtu )
Semen
Besi Ø 10 3 4
Besi Ø 8 2 4
Kawat

Cor Dak 3.4 3.4 0.1 1


Pasir Batu ( Sirtu )
Semen
Besi Ø 10
Kawat

Pasangan Bataco 3.4 3.4 4


3.4 3.4 18.382353 4
Pasir Pasang
Semen

Plesteran Pasir Pasang


Semen

Pekerjaan Begisting

Kayu Meranti 5/10 2 Bt 1


Jumlah
Kayu Meranti 5/5 25 Bt 1
Jumlah

Paku Biasa
3
Kaca 1.0
Kubah 1 Buah
Jumlah
Kubik Pasir Batu Semen Pasir Pasang

1.26 m3

1.26 Hitungan Besi 8


17 17.5 22.75
12 Btg
9 Btg
1 Kg

2.4 m3
2.40
32
11 Btg
8 Btg 19 152
1 Kg
Hitungan Luas Lingkaran Dudukan Kubah
3.142857 0.9
1.39 3.142857 0.8
10
12 Btg Keliling Lingkaran
8 Btg 2 3.142857
1 Kg 1.3 0.2

2.9 7

1.156 m3
1.156
16
13 Btg 22.66667 77.06667
1 Kg

46.24 m2 0.0544 18.38235


850.00 850.00 Bh
2
3
2
8

2 0.04 m³
2 0.04
25 0.25 m³
25 0.25

Kg
m2
6.20514286
11.00
1.895833 15.16667

12.66667

Luas Lingkaran Dudukan Kubah


0.9 2.545714
0.8 2.011429
0.534286 1.3 1 0.694571 m3

0.9 5.657143 m
6.5
36.77143 3.064286 12.25714
2 40.6 3.383333

6.422222 25.68889