Hal -1
0.0390 Kepala tukang batu @ Rp. 85,000.00 Rp. 3,315.00
0.3900 Tukang batu @ Rp. 70,000.00 Rp. 27,300.00
0.7810 Pembantu tukang batu @ Rp. 50,000.00 Rp. 39,050.00
1.2000 M3 Batu belah @ Rp. 441,875.00 Rp. 530,250.00
Rp. 76,490.00 Rp. 530,250.00 Rp. 606,740.00
Hal -2
2.0000 Kg. Kawat beton @ Rp. 17,500.00 Rp. 35,000.00
Rp. 1,001,250.00 Rp. 1,877,500.00 Rp. 2,878,750.00
1 Kg Rp. 10,012.50 Rp. 18,775.00 Rp. 28,787.50
L.1 Pekerjaan menyiram dan membongkar bekisting
4.0000 Pembantu tukang @ Rp. 50,000.00 Rp. 200,000.00
Rp. 200,000.00 Rp. Rp. 200,000.00
Hal -3
DAFTAR ANALISA
ANALISA URAIAN PEKERJAAN HARGA SATUAN UPAH BAHAN JUMLAH
F.38.b 1 M2 Dinding ( Tawing Layar ) papan Ulin & Lanan diserut rapi tebal 2 cm
1.8000 tukang kayu @ Rp. 70,000.00 @ Rp. 126,000.00 @ Rp.
0.1800 kepala tukang @ Rp. 85,000.00 @ Rp. 15,300.00 @ Rp.
0.6000 pekerja @ Rp. 50,000.00 @ Rp. 30,000.00 @ Rp.
0.0300 mandor @ Rp. 87,500.00 @ Rp. 2,625.00 @ Rp.
0.2000 Kg paku ulin @ Rp. 22,500.00 @ Rp. @ Rp. 4,500.00
0.2000 Kg paku kayu @ Rp. 18,500.00 @ Rp. @ Rp. 3,700.00
0.0290 M3 papan ulin @ Rp. 4,500,000.00 @ Rp. @ Rp. 130,500.00
0.0290 M3 papan lanan @ Rp. 1,687,500.00 @ Rp. @ Rp. 48,937.50
Papan Ulin Rp. 173,925.00 Rp. 135,000.00 Rp. 308,925.00
Papan Lanan upah 1/2 F.38.b Rp. 86,962.50 Rp. 52,637.50 Rp. 139,600.00
Tidak diketam upah 1/3 F.38.b Rp. 57,975.00 Rp. 52,637.50 Rp. 110,612.50
W.05 1 00 M2 PENGASPALAN
0.5000 Mandor @ Rp. 87,500.00 Rp. Rp. 43,750.00
10.0000 Pekerja @ Rp. 50,000.00 Rp. Rp. 500,000.00
0.0133 Biaya Gilas @ Rp. 9,807,500.00 Rp. Rp. 130,439.75
250.0000 Kg Aspal @ Rp. 5,250.00 Rp. 1,312,500.00
1.2000 M3 Batu Split @ Rp. 550,000.00 Rp. 660,000.00
1.0000 Alat Bantu @ Rp. 200,000.00 Rp. 200,000.00
0.0200 M3 Pasir Urug @ Rp. 57,375.00 Rp. 1,147.50
Rp. 2,173,647.50 Rp. 674,189.75 Rp. 2,847,837.25
UNTUK 1 M2 = 1/100 Rp. 21,736.48 Rp. 6,741.90 Rp. 28,478.37
HARGA
No. URAIAN SATUAN AKHIR
I PEKERJAAN PENDAHULUAN
1 Pengukuran, Pasang Patok dan Bowplank SNI 01.1.6 2,280.00 M2 20,232.50 46,130,100.00
2 Papan Nama Proyek Ls 1.00 Bh 523,000.00 523,000.00
3 Pembuatan Bangsal Kerja Ls 12.00 M2 365,000.00 4,380,000.00
4 Perataan Badan Jalan Ls 1,510.00 M2 22,500.00 33,975,000.00
JUMLAH 85,008,100.00
TERBILANG //// EMPAT RATUS DUA PULUH LIMA JUTA RUPIAH ////
…………………………… ……………………………
NIP………………………. NIP……………………….
Menyetujui :
Kepala Dinas Kelautan dan Perikanan
Kabupaten Seruyan
Hal - 18