DAFTAR HARGA SATUAN BAHAN DAN UPAH

PEKERJAAN : PERBAIKAN PAGAR DI AREA GEDUNG BANK SUMSEL BABEL KANTOR PUSAT
LOKASI : JALAN GUBERNUR H.A. BASTARI NO.07 JAKABARING PALEMBANG

NO. URAIAN SATUAN H.SATUAN


Rp
II. UPAH KERJA
1 Kepala Tukang Hari 140,000.00
2 Tukang Hari 122,000.00
3 Pekerja Hari 99,000.00
4 Mandor Hari 158,000.00

I. BAHAN :
1 Semen Baturaja 50Kg Kg 1,250.00
2 Semen Baturaja 50Kg Zak 62,500.00
3 Pasir Pasang M3 120,000.00
4 Pasir Urug M3 110,000.00
5 Batu Bata Lobang Bh 600.00
6 Batu Koral M3 410,000.00
7 Kayu Racuk Kls.IV M3 1,500,000.00
8 Kayu 5/7 Kls.III Kg 2,100,000.00
9 Kayu Gelam M1 15,000.00
10 Besi Begel Kg 12,000.00
11 Paku biasa Kg 20,000.00
12 Kawat Beton Kg 22,000.00
13 Cat Tembok ex. Dulux weather shield Kg 146,000.00
14 Cat Dasar shiler Kg 55,000.00
15 Tanah Urug M3 81,000.00
16 Seng Gelombang Lbr 50,000.00
17 Batu Alam M2 220,000.00
ANALISA HARGA SATUAN BIAYA PEKERJAAN
PEKERJAAN : PERBAIKAN PAGAR DI AREA GEDUNG BANK SUMSEL BABEL KANTOR PUSAT
LOKASI : JALAN GUBERNUR H.A. BASTARI NO.07 JAKABARING PALEMBANG

1. 1M3 PEK. PASANGAN BOUWPLANK


0.0120 M3 Kayu 5/7 Kls.III @Rp. 2,100,000.00 = Rp. 25,200.000
0.0200 Kg Paku biasa @Rp. 20,000.00 = Rp. 400.000
0.0070 M3 Kayu papan 3/20 Kls.IV @Rp. 1,500,000.00 = Rp. 10,500.000
Rp.
0.1000 oh Tukang @Rp. 122,000.00 = Rp. 12,200.000
0.1000 oh Pekerja @Rp. 99,000.00 = Rp. 9,900.000
0.0100 oh Ka. Tukang @Rp. 140,000.00 = Rp. 1,400.000
0.0050 oh Mandor @Rp. 158,000.00 = Rp. 790.000
Rp.
Rp.

2. 1M3 PEKERJAAN BONGKARAN PAGAR


6.6670 oh Pekerja @Rp. 99,000.00 = Rp. 660,033.000
0.3330 oh Mandor @Rp. 158,000.00 = Rp. 52,614.000
Rp.

3. A1. 1 M3. PEK. GALIAN TANAH BIASA


0.4000 Pekerja @Rp. 99,000.00 = Rp. 39,600.000
0.0400 Mandor @Rp. 158,000.00 = Rp. 6,320.000
= Rp. 45,920.000

4. 1 M3 PEK. URUGAN TANAH KEMBALI


0.1920 oh Pekerja @Rp. 99,000.00 = Rp. 19,008.000
0.0190 oh Mandor @Rp. 158,000.00 = Rp. 3,002.000
= Rp. 22,010.000

5. 1 M3 PEK. URUGAN PASIR URUG


1.2000 M3 Pasir Urug @Rp. 110,000.00 = Rp.
0.3000 oh Pekerja @Rp. 99,000.00 = Rp. 29,700.00
0.0100 oh Mandor @Rp. 158,000.00 = Rp. 1,580.00
= Rp.
= Rp.

6. 1 M3 PEK. TIMBUNAN TANAH


1.2000 M3 Tanah Urug @Rp. 81,000.00 = Rp.
0.3000 oh Pekerja @Rp. 99,000.00 = Rp. 29,700.00
0.0330 oh Mandor @Rp. 158,000.00 = Rp. 5,214.00
= Rp.
= Rp.
7. G33H. 1 M2 PEK. PAS.DINDING BATA TB.1 BATU AD.1:4
117.0000 Bh Batu Bata @Rp. 600.00 = Rp. 70,200.00
26.5500 Kg Semen Baturaja @Rp. 1,250.00 = Rp. 33,187.50
0.0930 M3 Pasir @Rp. 120,000.00 = Rp. 11,160.00
Rp.
0.2000 Tukang @Rp. 122,000.00 = Rp. 24,400.00
0.0200 Kepala Tukang @Rp. 140,000.00 = Rp. 2,800.00
0.6500 Pekerja @Rp. 99,000.00 = Rp. 64,350.00
0.0300 Mandor @Rp. 158,000.00 = Rp. 4,740.00
Rp.
Rp.
8. 1 M2 PEK. PELESTERAN AD.1:3 TB.15MM
0.0210 M3 Pasir @Rp. 120,000.00 = Rp. 2,520.00
7.0700 Kg Semen @Rp. 1,250.00 = Rp. 8,837.50
Rp.
0.2600 oh Pekerja @Rp. 140,000.00 = Rp. 36,400.00
0.2000 oh Tukang Batu @Rp. 99,000.00 = Rp. 19,800.00
0.0200 oh Kepala tukang @Rp. 122,000.00 = Rp. 2,440.00
0.0130 oh Mandor @Rp. 158,000.00 = Rp. 2,054.00
Rp.
Rp.

9. PEKERJAAN COR BETON :


A. 1 M3 PEK. BETON TAK BERTULANG AD.1:2:3
6.4000 Zak Semen 50 kg @Rp. 62,500.00 = Rp. 400,000.00
0.7800 M3 Koral @Rp. 410,000.00 = Rp. 319,800.00
0.5200 M3 Pasir @Rp. 120,000.00 = Rp. 62,400.00
Rp.
0.2500 oh Tukang @Rp. 122,000.00 = Rp. 30,500.00
0.0250 oh Kepala Tukang @Rp. 140,000.00 = Rp. 3,500.00
2.0000 oh Pekerja @Rp. 99,000.00 = Rp. 198,000.00
1.0000 oh Mandor @Rp. 158,000.00 = Rp. 158,000.00
Rp.
Rp.
B1. 1M3 Tulang Besi Sloof
160.3100 Kg Besi Beton @Rp. 12,000.00 =Rp. 1,923,720.00
2.0000 Kg Kawat Peningkat @Rp. 22,000.00 =Rp. 44,000.00
Rp.
6.7500 oh Tukang @Rp. 122,000.00 =Rp. 823,500.00
2.2500 oh Kepala Tukang @Rp. 140,000.00 =Rp. 315,000.00
6.7500 oh Pekerja @Rp. 99,000.00 =Rp. 668,250.00
Rp.
Rp.

B2. 1M3 Tulang Besi Kolom


165.0000 Kg Besi Beton @Rp. 12,000.00 =Rp. 1,980,000.00
2.0000 Kg Kawat Peningkat @Rp. 22,000.00 =Rp. 44,000.00
Rp.
6.7500 oh Tukang @Rp. 122,000.00 =Rp. 823,500.00
2.2500 oh Kepala Tukang @Rp. 140,000.00 =Rp. 315,000.00
6.7500 oh Pekerja @Rp. 99,000.00 =Rp. 668,250.00
Rp.
Rp.

B3. 1M3 Tulang Besi Ring Balok


102.6300 Kg Besi Beton @Rp. 12,000.00 =Rp. 1,231,560.00
2.0000 Kg Kawat Peningkat @Rp. 22,000.00 =Rp. 44,000.00
Rp.
6.7500 oh Tukang @Rp. 122,000.00 =Rp. 823,500.00
2.2500 oh Kepala Tukang @Rp. 140,000.00 =Rp. 315,000.00
6.7500 oh Pekerja @Rp. 99,000.00 =Rp. 668,250.00
Rp.
Rp.

B4. 1 M3 Tulang Besi Pondasi


98.4500 Kg Besi @Rp. 12,000.00 =Rp. 1,181,400.00
2.0000 Kg Kawat Pengikat @Rp. 22,000.00 =Rp. 44,000.00
Rp.
6.7500 oh Tukang @Rp. 122,000.00 =Rp. 823,500.00
2.2500 oh Kepala Tukang @Rp. 140,000.00 =Rp. 315,000.00
6.7500 oh Pekerja @Rp. 99,000.00 =Rp. 668,250.00
Rp.
Rp.
C. Bekesting (Kayu Cetakan) / M3 Plat
5.0000 oh Tukang @Rp. 122,000.00 =Rp. 610,000.00
0.5000 oh Kepala Tukang @Rp. 140,000.00 =Rp. 70,000.00
2.0000 oh Pekerja @Rp. 99,000.00 =Rp. 198,000.00
0.1000 oh Mandor @Rp. 158,000.00 =Rp. 15,800.00
Rp.
4.0000 Paku @Rp. 20,000.00 =Rp. 80,000.00
0.4000 Kayu Kelas IV @Rp. 1,500,000.00 =Rp. 600,000.00
Rp.
Rp.

D. Biaya Pembongkaran Bekesting


4.0000 oh Pekerja @Rp. 99,000.00 =Rp. 396,000.00

1M3 PEKERJAAN BETON SLOOF 1:2:3


1.0000 1M3 Cor Beton 1:2:3 @Rp. 1,172,200.00 =Rp. 1,172,200.00
1.0000 1M3 Tulang Besi Sloof @Rp. 3,774,470.00 =Rp. 3,774,470.00
0.6000 Bekesting (Kayu Cetakan) @Rp. 1,573,800.00 =Rp. 944,280.00
0.6000 Biaya Pembongkaran Bekesting @Rp. 396,000.00 =Rp. 237,600.00
Rp.

10. 1M3 PEKERJAAN BETON KOLOM 1:2:3


1.0000 1M3 Cor Beton 1:2:3 @Rp. 1,172,200.00 =Rp. 1,172,200.00
1.0000 1M3 Tulang Besi Kolom @Rp. 3,830,750.00 =Rp. 3,830,750.00
1.0000 Bekesting (Kayu Cetakan) @Rp. 1,573,800.00 =Rp. 1,573,800.00
1.0000 Biaya Pembongkaran Bekesting @Rp. 396,000.00 =Rp. 396,000.00
Rp.

11. 1M3 PEKERJAAN BETON RING BALOK 1:2:3


1.0000 1M3 Cor Beton 1:2:3 @Rp. 1,172,200.00 =Rp. 1,172,200.00
1.0000 1M3 Tulang Besi Ring Balok @Rp. 3,082,310.00 =Rp. 3,082,310.00
1.0000 Bekesting (Kayu Cetakan) @Rp. 1,573,800.00 =Rp. 1,573,800.00
1.0000 Biaya Pembongkaran Bekesting @Rp. 396,000.00 =Rp. 396,000.00
Rp.

12. 1M3 PEKERJAAN BETON SETEMPAT AD.1:2:3


1.0000 1M3 Cor Beton 1:2:3 @Rp. 1,172,200.00 =Rp. 1,172,200.00
1.0000 1M3 Tulang Besi Pondasi @Rp. 3,032,150.00 =Rp. 3,032,150.00
0.4000 Bekesting (Kayu Cetakan) @Rp. 1,573,800.00 =Rp. 629,520.00
0.4000 Biaya Pembongkaran Bekesting @Rp. 396,000.00 =Rp. 158,400.00
Rp.

13. PEKERJAAN LANTAI KERJA PONDASI COR BETON AD. 1:3:5


218.0000 Kg Semen Baturaja @Rp. 1,250.00 =Rp 272,500.00
0.5200 M3 Pasir Pasang @Rp. 120,000.00 =Rp 62,400.00
0.8700 M3 Koral @Rp. 410,000.00 =Rp 356,700.00
Rp.
1.6500 oh Pekerja @Rp. 99,000.00 =Rp 163,350.00
0.2500 oh Tukang Batu @Rp. 122,000.00 =Rp 30,500.00
0.0250 oh Kepala Tukang @Rp. 140,000.00 =Rp 3,500.00
0.0800 oh Mandor @Rp. 158,000.00 =Rp 12,640.00
Rp.
Rp.

14. 1M2 PEKERJAAN ACIAN DINDING


3.2500 Kg Semen @Rp. 1,250.00 =Rp

0.1500 oh Pekerja @Rp. 99,000.00 =Rp 14,850.00


0.1000 oh Tukang Batu @Rp. 122,000.00 =Rp 12,200.00
0.0100 oh Kepala Tukang @Rp. 140,000.00 =Rp 1,400.00
0.0080 oh Mandor @Rp. 158,000.00 =Rp 1,264.00
Rp.
Rp.

15. 1M2 Pembuatan Pagar Sementara dari Seng Gelombang t. 2m


0.1000 oh Pekerja @Rp. 99,000.00 =Rp. 9,900.00
0.1000 oh Tukang Kayu @Rp. 122,000.00 =Rp. 12,200.00
0.0100 oh Kepala Tukang @Rp. 140,000.00 =Rp. 1,400.00
0.0100 oh Mandor @Rp. 158,000.00 =Rp. 1,580.00
Rp.
1.2500 Batang Kayu Gelam @Rp. 15,000.00 =Rp. 18,750.00
1.2000 Lembar Seng Gelombang @Rp. 50,000.00 =Rp. 60,000.00
2.5000 Kg Semen Baturaja @Rp. 1,250.00 =Rp. 3,125.00
0.0050 M3 Pasir pasang @Rp. 120,000.00 =Rp. 600.00
0.0090 M3 Koral @Rp. 410,000.00 =Rp. 3,690.00
0.0600 Kg Paku Biasa @Rp. 20,000.00 =Rp. 1,200.00
Rp.
Rp.

16. 1M2 PEKERJAAN PEMASANGAN BATU ALAM CANDI UK. 30/40


1.0200 M2 Batu Alam @Rp. 220,000.00 =Rp. 224,400.00
12.4400 Kg Semen @Rp. 1,250.00 =Rp. 15,550.00
0.0250 M3 Pasir @Rp. 120,000.00 =Rp. 3,000.00
Rp.
0.3750 oh Tukang @Rp. 122,000.00 =Rp. 45,750.00
0.1870 oh Pekerja @Rp. 99,000.00 =Rp. 18,513.00
Rp.
Rp.

17. 1 M2 PEKERJAAN PAS. CERUCUK GELAM


16.0000 Btg Kayu Gelam @Rp. 15,000.00 =Rp.

0.3200 oh Pekerja @Rp. 99,000.00 =Rp. 31,680.00


0.0190 oh Kepala Tukang @Rp. 140,000.00 =Rp. 2,660.00
=Rp.

18. 1 M2 Pekerjaan Profilan Ban Atas dan Bawah uk.10cm


0.0600 Zak Semen @Rp. 62,500.00 =Rp. 3,750.00
0.0240 M3 Pasir Pasang @Rp. 120,000.00 =Rp. 2,880.00
=Rp.
1.2000 oh Tukang Batu @Rp. 122,000.00 =Rp. 146,400.00
0.1200 oh Kepala Tukang @Rp. 140,000.00 =Rp. 16,800.00
0.6000 oh Pekerja @Rp. 99,000.00 =Rp. 59,400.00
0.0300 oh Mandor @Rp. 158,000.00 =Rp. 4,740.00
=Rp.
=Rp.

19. 1 M2 PEK. PENGECATAN TEMBOK BARU


0.1200 Kg Cat Dasar shiler @Rp. 55,000.00 = Rp. 6,600.00
0.2600 Kg Cat tembok Dulux weatrer shield @Rp. 146,000.00 = Rp. 37,960.00
= Rp.
0.0820 oh Tukang @Rp. 122,000.00 = Rp. 10,004.00
0.0082 oh Kepala tukang @Rp. 140,000.00 = Rp. 1,148.00
0.0200 oh Pekerja @Rp. 99,000.00 = Rp. 1,980.00
0.0025 oh Mandor @Rp. 158,000.00 = Rp. 395.00
= Rp.
= Rp.
36,100.00

24,290.00
60,390.00

712,647.00

132,000.00

31,280.00
163,280.00

97,200.00

34,914.00
132,114.00
114,547.500

96,290.000
210,837.500

11,357.500

60,694.000
72,051.500

782,200.000

390,000.000
1,172,200.000

1,967,720.00

1,806,750.00
3,774,470.00

2,024,000.00

1,806,750.00
3,830,750.00

1,275,560.00

1,806,750.00
3,082,310.00

1,225,400.00

1,806,750.00
3,032,150.00

893,800.00

680,000.00
1,573,800.00

6,128,550.00
6,972,750.00

6,224,310.00

4,992,270.00

691,600.00

209,990.00
901,590.00

4,062.50

29,714.00
33,776.50

25,080.00
87,365.00
112,445.00

242,950.00

64,263.00
307,213.00

240,000.00

34,340.00
274,340.00

6,630.00

227,340.00
233,970.00

44,560.00

13,527.00
58,087.00
RENCANA ANGGARAN BIAYA
PEKERJAAN : PERBAIKAN PAGAR DI AREA GEDUNG BANK SUMSEL BABEL KANTOR PUSAT
LOKASI : JALAN GUBERNUR H.A. BASTARI NO.07 JAKABARING PALEMBANG

NO. URAIAN PEKERJAAN VOLUME

I PEKERJAAN PERSIAPAN
1. Pekerjaan pasangan pagar sementara dari seng gelombang t.2mm 237.16 m2
2. Pekerjaan pasangan bowplank 52.98 m'
3. Pekerjaan bongkaran pagar existing (bongkar dan buang puing ke luar lokasi) 21.19 m3
4. Pekerjaan penebangan pohon sawit existing (tebang dan buang keluar lokasi) 20.00 btg
5. Mobilisasi dan demobilisasi 1.00 ls
6. Pembersihan dan perapian lokasi (awal dan akhir) 1.00 ls

TOTAL I
II PEKERJAAN STRUKTUR
1. Pekerjaan Tanah dan Pondasi
1.1 Pek. Galian tanah pondasi 8.40 m3
1.2. Pek. Urugan tanah kembali 6.30 m3
1.3. Pek. Pasir urug bawah pondasi 1.26 m3
1.4. Pek. Pasang cerucup gelam untuk pondasi uk. 1.5m - 2m 10.50 m2
1.5. Pek. Timbunan tanah depan pagar + pemadatan 18.00 m3
1.6. Pek. Pondasi setempat 3.36 m3

2. Pekerjaan Beton
2.1. Pek. Sloof beton bertulang ad.1:2:3 uk.18/25 5.90 m3
2.2. Pek. Kolom Beton bertulang ad.1:2:3 uk.20/20 2.10 m3
2.3. Pek. Ring Balok beton bertulang ad.1:2:3 uk.12/25 3.56 m3
2.4. Pek. Lantai kerja bawah pondasi 1.26 m3

TOTAL II
III PEKERJAAN ASITEKTUR
1. Pekerjaan Dinding dan Plesteran
1.1. Pas. Dinding bata, tebal 1 bata batu ad.1:4 110.97 m2
1.2. Pas. Plesteran dinding, tebal 15 mm ad.1:3 397.56 m2

2. Pekerjaan Finishing dan Profilan


2.1. Pek. Acian dinding 300.62 m2
2.2. Pek. Acian Profilan 66.40 m2
2.3. Pek. Profilan ban atas dan bawah 10 cm (bag. Dalam dan luar) lihat gbr 43.02 m2
2.4. Pek. Profilan ornamen bingkai tengah (bagian dalam dan luar) uk. 40/15/2 204.00 bh
2.5. Pek. Pasangan dinding batu alam candi/andesit uk.30/40 (Bag.luar) 49.51 m2

3. Pekerjaan Pegecatan
3.1. Pek. Cat Dinding pagar exterior ex. Dulux weather shield 367.02 m2

TOTAL III
H. SATUAN JML. HARGA
Rp. Rp.

112,445.00 26,667,456.20
60,390.00 3,199,462.20
712,647.00 15,100,989.93
800,000.00 16,000,000.00
2,000,000.00 2,000,000.00
1,000,000.00 1,000,000.00

63,967,908.33

45,920.00 385,728.00
22,010.00 138,663.00
163,280.00 205,732.80
274,340.00 2,880,570.00
132,114.00 2,378,052.00
4,992,270.00 16,774,027.20
22,762,773.00

6,128,550.00 36,158,445.00
6,972,750.00 14,642,775.00
6,224,310.00 22,158,543.60
901,590.00 1,136,003.40
74,095,767.00
96,858,540.00

210,837.50 23,396,637.38
72,051.50 28,644,794.34
52,041,431.72

33,776.50 10,153,891.43
33,776.50 2,242,759.60
233,970.00 10,065,389.40
15,000.00 3,060,000.00
307,213.00 15,210,115.63
40,732,156.06

58,087.00 21,319,090.74
21,319,090.74
114,092,678.52
274,919,126.85
27,491,912.68
302,411,039.53

OE. 303,267,000
REKAPITULASI
PEKERJAAN : PERBAIKAN PAGAR DI AREA GEDUNG BANK SUMSEL BABEL KANTOR PUSAT
LOKASI : JALAN GUBERNUR H.A. BASTARI NO.07 JAKABARING PALEMBANG

NO. URAIAN PEKERJAAN SATUAN JUMLAH HARGA


Rp. Rp.
I. PEKERJAAN PERSIAPAN

TOTAL I

II. PEKERJAAN STRUKTUR


1. Pekerjaan Tanah dan Pondasi
2. Pekerjaan Beton

TOTAL II

III. PEKERJAAN ARSITEKTUR


1. Pekerjaan Dinding dan Plesteran
2. Pekerjaan Finishing dan Profilan
3. Pekerjaan Pengecatan

TOTAL III
Jumlah Total I+II+III
PPn. 10%
Jumlah
Pembulatan
TERBILANG :

Palembang, 19 Juni 2019


CV. HASTA KARYA PERKASA

RIO, ST.
DIREKTUR