Anda di halaman 1dari 80

ANALISA HARGA SATUAN

A UMUM
1.1. DESAIN, SURVEI, DAN PERIJINAN
1 Pengukuran topography /m2
a. Upah
0.0800 oh Surveyor Geodesi @ Rp. 115,000.00 = Rp. 9,200.00
0.0500 oh Asisten Surveyor Geodesi @ Rp. 75,000.00 = Rp. 3,750.00
Jumlah ( a ) = Rp. 12,950.00
b. Bahan
0.0020 m3 Kayu klas III @ Rp. 3,575,000.00 = Rp. 7,150.00
0.0350 kg Paku @ Rp. 16,000.00 = Rp. 560.00
0.0070 hari Sewa Theodholite @ Rp. 195,000.00 = Rp. 1,365.00
Jumlah ( b ) = Rp. 9,075.00
Jumlah ( a + b ) = Rp. 22,025.00
Untuk pengukuran jalan KA diambil 10 %-nya = Rp. 2,202.50
Dibulatkan = Rp. 2,200.00

2 Pembuatan shop drawing dan asbuilt drawing / set = Rp. 25,000,000.00

3 Penyelidikan tanah (DCP) /ttk = Rp. 100,000.00

4 Penyelidikan tanah (Sand Cone) /ttl = Rp. 150,000.00

5 Penyelidikan tanah (Plat Bearing) /ttk = Rp. 275,000.00

6 Penyelidikan sampel quarry /ttk = Rp. 2,000,000.00

1.2. MANAJEMEN LAPANGAN


1.2.1. ADMINISTRASI LAPANGAN
1 Dokumentasi /bln = Rp. 1,500,000.00

1.2.2. OPERASIONAL KANTOR LAPANGAN


1 Membuat dan membongkar direksi keet, los kerja, dan gudang /m2
Membuat Direksi Keet uk. 27 m dengan lantai tebal 5 cm
a. Upah
12.5820 oh Pekerja @ Rp. 66,000.00 = Rp. 830,412.00
4.7817 oh Tukang @ Rp. 75,000.00 = Rp. 358,627.50
Jumlah ( a ) = Rp. 1,189,039.50
b. Bahan
1.1502 m3 Kayu klas III @ Rp. 3,575,000.00 = Rp. 4,111,965.00
29.9997 lbr Seng BJLS 28 @ Rp. 90,000.00 = Rp. 2,699,973.00
24.0003 lbr Triplek t= 4 mm @ Rp. 72,500.00 = Rp. 1,740,021.75
3.9987 kg Paku Campur @ Rp. 16,000.00 = Rp. 63,979.20
0.9990 kg Paku Seng @ Rp. 18,750.00 = Rp. 18,731.25
2.0007 bh Pintu Panel Double Teakwood @ Rp. 550,000.00 = Rp. 1,100,385.00
3.9987 bh Jendela Kaca / Ram Kawat @ Rp. 160,000.00 = Rp. 639,792.00
1.3500 m3 Beton Tumbuk @ Rp. 883,000.00 = Rp. 1,192,050.00
Jumlah ( b ) = Rp. 11,566,897.20
Jumlah ( a + b ) = Rp. 12,755,936.70
Untuk per m2 = Rp. 472,442.10
Dibulatkan = Rp. 472,400.00

2 Papan nama pekerjaan /m2


a. Upah
0.0175 oh Tukang Batu @ Rp. 75,000.00 = Rp. 1,312.50
1.0000 oh Tukang Kayu @ Rp. 75,000.00 = Rp. 75,000.00
1.0000 oh Tukang Cat @ Rp. 75,000.00 = Rp. 75,000.00
2.1000 oh Pekerja @ Rp. 66,000.00 = Rp. 138,600.00
1.0050 oh Mandor @ Rp. 98,000.00 = Rp. 98,490.00
Jumlah ( a ) = Rp. 388,402.50
b. Bahan
0.0350 m3 Kayu klas III @ Rp. 3,575,000.00 = Rp. 125,125.00
1.4000 m' Plat seng tebal 0.050 cm lebar 0.90m @ Rp. 75,000.00 = Rp. 105,000.00
0.6000 kg Paku @ Rp. 16,000.00 = Rp. 9,600.00
1.5000 kg Cat Kayu @ Rp. 35,750.00 = Rp. 53,625.00
16.8000 kg Semen PC /kg @ Rp. 1,380.00 = Rp. 23,184.00
0.0270 m3 Pasir beton @ Rp. 225,000.00 = Rp. 6,075.00
0.0405 m3 Koral/krikil @ Rp. 235,000.00 = Rp. 9,517.50
Jumlah ( b ) = Rp. 332,126.50
Jumlah ( a + b ) = Rp. 720,529.00
Dibulatkan = Rp. 720,500.00

3 Operasional direksikeet /set = Rp. 25,000,000.00

1.3. MOBILISASI DAN DEMOBILISASI


1.4.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
1 Mobilisasi dan demobilisasi Peralatan Berat /pkt = Rp. 100,000,000.00

2 Perbaikan jalan akses masyarakat /m2

Asphalt Concrete dan Menghampar ATB t = 6 cm / m2 sampai ke lokasi Pekerjaan


a. bahan
0.3088 m³ Batu pecah 2/3 @ Rp. 240,000.00 = Rp. 74,112.00
0.8629 m³ Batu Pecah 05 - 20 mm @ Rp. 162,300.00 = Rp. 140,048.67
0.4081 m³ Batu Pecah 00 - 05 mm @ Rp. 179,000.00 = Rp. 73,049.90
21.9240 kg Semen PC /kg @ Rp. 1,380.00 = Rp. 30,255.12
121.8696 kg Aspal @ Rp. 6,600.00 = Rp. 804,339.36
1.1000 ltr Prime Coat @ Rp. 9,600.00 = Rp. 10,560.00

b. alat
0.0644 jam Sewa Asphalt Mixing Plant @ Rp. 307,200.00 = Rp. 19,783.68
0.0859 jam Sewa Dump Truck @ Rp. 109,800.00 = Rp. 9,431.82
0.0856 jam Sewa Asphalt Finisher @ Rp. 332,100.00 = Rp. 28,427.76
0.0543 jam Sewa Tandem Roller @ Rp. 530,500.00 = Rp. 28,806.15
0.1017 jam Sewa Pneumatic Tire Roller 8-10 ton @ Rp. 501,700.00 = Rp. 51,022.89
1.0000 ls Alat bantu @ Rp. 2,000.00 = Rp. 2,000.00

c. upah
0.0921 oh Pekerja @ Rp. 66,000.00 = Rp. 6,078.60
0.0184 oh Mandor @ Rp. 98,000.00 = Rp. 1,803.20

1.0000 m³ Asphalt Concrete 2,30 ton 1,279,719.15

1.0000 m2 Asphalt Concrete tebal 6 cm 0,14 ton 151,390.78


Dibulatkan = Rp. 151,300.00
B JALUR DAN BANGUNAN
2.1. SIPIL
2.1.1 PEKERJAAN PERSIAPAN
1 Pembersihan lapangan /m2
a. Upah
0.0300 oh Pekerja @ Rp. 66,000.00 = Rp. 1,980.00
0.0100 oh Mandor @ Rp. 98,000.00 = Rp. 980.00
Jumlah ( a ) = Rp. 2,960.00
Dibulatkan = Rp. 2,900.00

2.1.2. PERBAIKAN TANAH DASAR


1 Perkuatan dengan geotekstile /m2

a. Pengadaan dan pemasangan geotxtile


2.7000 m2 Geotektile perkuatan @ Rp. 32,500.00 = Rp. 87,750.00
0.0800 oh Pekerja @ Rp. 66,000.00 = Rp. 5,280.00
0.0400 oh Tukang @ Rp. 75,000.00 = Rp. 3,000.00
0.0400 oh Mandor @ Rp. 98,000.00 = Rp. 3,920.00
Jumlah ( a ) = Rp. 99,950.00

b. Pengadaan dan pemadatan sirtu untuk perbaikan tanah dasar


1.2000 m3 Sirtu @ Rp. 95,000.00 = Rp. 114,000.00
0.3000 oh Pekerja @ Rp. 66,000.00 = Rp. 19,800.00
0.0100 oh Mandor @ Rp. 98,000.00 = Rp. 980.00
0.0050 jam Sewa Excavator @ Rp. 230,000.00 = Rp. 1,150.00
0.0250 jam Sewa Vibrator roller @ Rp. 112,500.00 = Rp. 2,812.50
Jumlah ( c ) = Rp. 138,742.50

Jumlah = Rp. 238,692.50


Dibulatkan = Rp. 238,600.00

2.1.2. KONSTRUKSI TUBUH BAAN


1 Stripping / pengupasan lapisan tanah dasar mak 50cm /m2
a. Upah
0.0045 oh Pekerja @ Rp. 66,000.00 = Rp. 297.00
0.0330 oh Mandor @ Rp. 98,000.00 = Rp. 3,234.00
Jumlah ( a ) = Rp. 3,531.00
b. Peralatan
0.0416 jam Sewa Buldozer @ Rp. 180,000.00 = Rp. 7,488.00
0.0090 jam Sewa Dump truck 5 ton @ Rp. 135,000.00 = Rp. 1,215.00
0.0107 jam Sewa Excavator @ Rp. 230,000.00 = Rp. 2,461.00
Jumlah ( b ) = Rp. 11,164.00
Jumlah ( a + b ) = Rp. 14,695.00
Dibulatkan = Rp. 14,600.00

2 Timbunan dengan material tanah pilihan /m3


a. Upah
0.3750 oh Pekerja @ Rp. 66,000.00 = Rp. 24,750.00
0.0125 oh Mandor @ Rp. 98,000.00 = Rp. 1,225.00
Jumlah ( a ) = Rp. 25,975.00
b. Bahan
1.2000 m3 Tanah pilihan @ Rp. 39,000.00 = Rp. 46,800.00
Jumlah ( b ) = Rp. 46,800.00
c. Peralatan
0.2289 jam Sewa Dump truck 5 ton @ Rp. 135,000.00 = Rp. 30,901.50
0.0061 jam Sewa Wheel loader @ Rp. 225,000.00 = Rp. 1,372.50
0.0010 jam Sewa Buldozer @ Rp. 180,000.00 = Rp. 180.00
0.0010 jam Sewa Water tanker @ Rp. 235,000.00 = Rp. 235.00
Jumlah ( c ) = Rp. 32,689.00
Jumlah ( a + b + c ) = Rp. 105,464.00
Dibulatkan = Rp. 105,400.00
3 Timbunan dengan sirtu (sub balas) /m3
a. Upah
0.3000 oh Pekerja @ Rp. 66,000.00 = Rp. 19,800.00
0.0100 oh Mandor @ Rp. 98,000.00 = Rp. 980.00
Jumlah ( a ) = Rp. 20,780.00
b. Bahan
1.2000 m3 Sirtu @ Rp. 95,000.00 = Rp. 114,000.00
Jumlah ( b ) = Rp. 114,000.00
c. Peralatan
0.0050 jam Sewa Excavator @ Rp. 230,000.00 = Rp. 1,150.00
0.0250 jam Sewa Vibrator roller @ Rp. 112,500.00 = Rp. 2,812.50
Jumlah ( c ) = Rp. 3,962.50
Jumlah ( a + b + c ) = Rp. 138,742.50
Dibulatkan = Rp. 138,700.00

4 Galian tanah dengan alat berat /m3


a. Upah
0.004266 oh Pekerja @ Rp. 66,000.00 = Rp. 281.56
0.0021322 oh Mandor @ Rp. 98,000.00 = Rp. 208.96
Jumlah ( a ) = Rp. 490.51
b. Bahan
0.074622 jam Sewa Excavator @ Rp. 230,000.00 = Rp. 17,163.06
0.206410 jam Sewa Dump Truck 5 ton @ Rp. 135,000.00 = Rp. 27,865.35
Jumlah ( b ) = Rp. 45,028.41
Jumlah ( a + b ) = Rp. 45,518.92
Dibulatkan = Rp. 45,500.00

5 Membuang Tanah sejauh 30 m /m3


a. Upah
0.2500 oh Pekerja @ Rp. 66,000.00 = Rp. 16,500.00
0.0100 oh Mandor @ Rp. 98,000.00 = Rp. 980.00
Jumlah ( a ) = Rp. 17,480.00
Dibulatkan = Rp. 17,400.00

2.1.2. DRAINASE

1 Drainase beton pracetak 80x80 cm tebal 10 cm /m'


1.0000 bh Memasang U-ditch precast @ Rp. 1,559,100.00 = Rp. 1,559,100.00
1.1500 m3 Galian tanah @ Rp. 45,500.00 = Rp. 52,325.00
0.1600 m3 Pasang batu kosong @ Rp. 288,900.00 = Rp. 46,224.00
0.0800 m3 Lantai kerja pasir urug @ Rp. 170,700.00 = Rp. 13,656.00
0.0400 m3 Lantai kerja beton K.175 @ Rp. 883,000.00 = Rp. 35,320.00
0.2300 Ls Urugan tanah kembali @ Rp. 17,300.00 = Rp. 3,979.00
Jumlah = Rp. 1,710,604.00
Dibulatkan = Rp. 1,710,600.00

Memasang U-Ditch precast /m'


a. Upah
0.2700 oh Pekerja @ Rp. 66,000.00 = Rp. 17,820.00
0.0700 oh Mandor @ Rp. 98,000.00 = Rp. 6,860.00
Jumlah ( a ) = Rp. 24,680.00
b. Bahan
1.0000 m3 U-Ditch precast 80x80 cm @ Rp. 1,370,000.00 = Rp. 1,370,000.00
Jumlah ( b ) = Rp. 1,370,000.00
c. Peralatan
0.4700 jam Sewa Crane 30 ton @ Rp. 350,000.00 = Rp. 164,500.00
Jumlah ( c ) = Rp. 164,500.00
Jumlah ( a + b + c ) = Rp. 1,559,180.00
Dibulatkan = Rp. 1,559,100.00
Pasangan batu kosong /m3
a. Upah
0.7800 oh Pekerja @ Rp. 66,000.00 = Rp. 51,480.00
0.3900 oh Tukang @ Rp. 75,000.00 = Rp. 29,250.00
0.0390 oh Kepala tukang @ Rp. 87,000.00 = Rp. 3,393.00
0.0390 oh Mandor @ Rp. 98,000.00 = Rp. 3,822.00
Jumlah ( a ) = Rp. 87,945.00
b. Bahan
1.2000 m3 Batu kali / belah @ Rp. 167,500.00 = Rp. 201,000.00
Jumlah ( b ) = Rp. 201,000.00
Jumlah ( a + b ) = Rp. 288,945.00
Dibulatkan = Rp. 288,900.00

Pasir urug /m3


a. Upah
0.3000 oh Pekerja @ Rp. 66,000.00 = Rp. 19,800.00
0.0100 oh Mandor @ Rp. 98,000.00 = Rp. 980.00
Jumlah ( a ) = Rp. 20,780.00
b. Bahan
1.2000 m3 Pasir Urug @ Rp. 125,000.00 = Rp. 150,000.00
Jumlah ( b ) = Rp. 150,000.00
Jumlah ( a + b ) = Rp. 170,780.00
Dibulatkan = Rp. 170,700.00

Beton K.175
a. Upah
1.6500 oh Pekerja @ Rp. 66,000.00 = Rp. 108,900.00
0.2750 oh Tukang @ Rp. 75,000.00 = Rp. 20,625.00
0.0280 oh Kepala tukang @ Rp. 87,000.00 = Rp. 2,436.00
0.0830 oh Mandor @ Rp. 98,000.00 = Rp. 8,134.00
Jumlah ( a ) = Rp. 140,095.00
b. Bahan
326.0000 kg Semen PC /kg @ Rp. 1,380.00 = Rp. 449,880.00
0.5717 m3 Batu pecah 2/3 @ Rp. 240,000.00 = Rp. 137,208.00
0.5429 m3 Pasir beton @ Rp. 225,000.00 = Rp. 122,152.50
0.2150 m3 Air @ Rp. 157,000.00 = Rp. 33,755.00
Jumlah ( b ) = Rp. 742,995.50
Jumlah ( a + b ) = Rp. 883,090.50
Dibulatkan = Rp. 883,000.00

Urugan Tanah Kembali /m3


a. Upah
0.2500 oh Pekerja @ Rp. 66,000.00 = Rp. 16,500.00
0.0083 oh Mandor @ Rp. 98,000.00 = Rp. 813.40
Jumlah ( a ) = Rp. 17,313.40
Dibulatkan = Rp. 17,300.00

2 Retaining wall

b. Pasangan batu kosong /m3


a. Upah
0.7800 oh Pekerja @ Rp. 66,000.00 = Rp. 51,480.00
0.3900 oh Tukang @ Rp. 75,000.00 = Rp. 29,250.00
0.0390 oh Kepala tukang @ Rp. 87,000.00 = Rp. 3,393.00
0.0390 oh Mandor @ Rp. 98,000.00 = Rp. 3,822.00
Jumlah ( a ) = Rp. 87,945.00
b. Bahan
1.2000 m3 Batu kali / belah @ Rp. 167,500.00 = Rp. 201,000.00
Jumlah ( b ) = Rp. 201,000.00
Jumlah ( a + b ) = Rp. 288,945.00
Dibulatkan = Rp. 288,900.00
c. Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 /m3
a. Upah
1.6500 oh Pekerja @ Rp. 66,000.00 = Rp. 108,900.00
0.2750 oh Tukang @ Rp. 75,000.00 = Rp. 20,625.00
0.0280 oh Kepala tukang @ Rp. 87,000.00 = Rp. 2,436.00
0.0830 oh Mandor @ Rp. 98,000.00 = Rp. 8,134.00
Jumlah ( a ) = Rp. 140,095.00
b. Bahan
326.0000 kg Semen PC /kg @ Rp. 1,380.00 = Rp. 449,880.00
0.5717 m3 Batu pecah 2/3 @ Rp. 240,000.00 = Rp. 137,208.00
0.5429 m3 Pasir beton @ Rp. 225,000.00 = Rp. 122,152.50
0.2150 m3 Air @ Rp. 157,000.00 = Rp. 33,755.00
Jumlah ( b ) = Rp. 742,995.50
Jumlah ( a + b ) = Rp. 883,090.50
Dibulatkan = Rp. 883,000.00

d. Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 /m3
a. Upah
1.6500 oh Pekerja @ Rp. 66,000.00 = Rp. 108,900.00
0.2750 oh Tukang @ Rp. 75,000.00 = Rp. 20,625.00
0.0280 oh Kepala tukang @ Rp. 87,000.00 = Rp. 2,436.00
0.0830 oh Mandor @ Rp. 98,000.00 = Rp. 8,134.00
Jumlah ( a ) = Rp. 140,095.00
b. Bahan
384.0000 kg Semen PC /kg @ Rp. 1,380.00 = Rp. 529,920.00
0.5772 m3 Batu pecah 2/3 @ Rp. 240,000.00 = Rp. 138,528.00
0.4943 m3 Pasir beton @ Rp. 225,000.00 = Rp. 111,217.50
0.2150 m3 Air @ Rp. 157,000.00 = Rp. 33,755.00
Jumlah ( b ) = Rp. 813,420.50
Jumlah ( a + b ) = Rp. 953,515.50
Dibulatkan = Rp. 953,500.00

e. Pembesian dengan besi ulir /kg


Pembesian 10 kg dengan besi polos atau ulir
a. Upah
0.0700 oh Pekerja @ Rp. 66,000.00 = Rp. 4,620.00
0.0700 oh Tukang besi @ Rp. 75,000.00 = Rp. 5,250.00
0.0070 oh Kepala Tukang @ Rp. 87,000.00 = Rp. 609.00
0.0040 oh Mandor @ Rp. 98,000.00 = Rp. 392.00
Jumlah ( a ) = Rp. 10,871.00
b. Bahan
10.5000 kg Besi beton 74,374.40 @ Rp. 12,000.00 = Rp. 126,000.00
0.1500 kg Kawat beton 121,373.30 @ Rp. 15,000.00 = Rp. 2,250.00
Jumlah ( b ) = Rp. 128,250.00
Jumlah ( a + b ) = Rp. 139,121.00
Pembesian /kg = Rp. 13,912.10
Dibulatkan = Rp. 13,900.00

f. Urugan pasir /m3


a. Upah
0.3000 oh Pekerja @ Rp. 66,000.00 = Rp. 19,800.00
0.0100 oh Mandor @ Rp. 98,000.00 = Rp. 980.00
Jumlah ( a ) = Rp. 20,780.00
b. Bahan
1.2000 m3 Pasir urug @ Rp. 125,000.00 = Rp. 150,000.00
Jumlah ( b ) = Rp. 150,000.00
Jumlah ( a + b ) = Rp. 170,780.00
Dibulatkan = Rp. 170,700.00

g. Bekisting /m2
Pasang bekisting untuk dinding(m2) (SNI 7394-2008-25)
a. Upah
0.6600 oh Pekerja @ Rp. 66,000.00 = Rp. 43,560.00
0.3300 oh Tukang kayu @ Rp. 75,000.00 = Rp. 24,750.00
0.0330 oh Kepala tukang kayu @ Rp. 87,000.00 = Rp. 2,871.00
0.0330 oh Mandor @ Rp. 98,000.00 = Rp. 3,234.00
Jumlah ( a ) = Rp. 74,415.00
b. Bahan
0.0300 m3 Kayu klas III 634.9025 19.05 @ Rp. 3,575,000.00 = Rp. 107,250.00
0.4000 kg Paku 634.9025 253.96 @ Rp. 16,000.00 = Rp. 6,400.00
0.2000 liter Minyak begisting 634.9025 126.98 @ Rp. 18,000.00 = Rp. 3,600.00
0.0200 m3 Kayu klas II 634.9025 12.70 @ Rp. 4,500,000.00 = Rp. 90,000.00
0.3500 lbr Plywood 9 mm 634.9025 222.22 @ Rp. 145,000.00 = Rp. 50,750.00
3.0000 btg Kayu Dolken Dia 8 634.9025 1,904.71 @ Rp. 20,000.00 = Rp. 60,000.00
Jumlah ( b ) = Rp. 318,000.00
Jumlah ( a + b ) = Rp. 392,415.00
Dibulatkan = Rp. 392,400.00

2.2 JALAN REL


2.2.1. MATERIAL JALAN KA

1 Angkutan rel /ton


a. Upah
10.0000 oh Pekerja @ Rp. 66,000.00 = Rp. 660,000.00
1.0000 oh Mandor @ Rp. 98,000.00 = Rp. 98,000.00
Jumlah ( a ) = Rp. 758,000.00
b. Bahan
0.0200 m3 Kayu klas II @ Rp. 4,500,000.00 = Rp. 90,000.00
1.5000 kg Kawat pral @ Rp. 29,000.00 = Rp. 43,500.00
Jumlah ( b ) = Rp. 133,500.00
c. Peralatan
0.0178 jam Sewa Crane 10-15 ton @ Rp. 325,000.00 = Rp. 5,785.00
Jumlah ( c ) = Rp. 5,785.00
Jumlah ( a + b + c ) = Rp. 897,285.00
Dibulatkan = Rp. 897,200.00

2 Bantalan Kayu untuk MJ lengkap dengan aksesoris /ttk


Bantalan Kayu untuk MJ + aksesoris
a. Upah
2.0000 bh Bantalan Kayu uk. 20x22x200 cm @ Rp. 1,200,000.00 = Rp. 2,400,000.00
0.0180 ltr Residu @ Rp. 8,000.00 = Rp. 144.00
4.0000 bh Base plate (400x400x12) @ Rp. 210,000.00 = Rp. 840,000.00
16.0000 bh Paku TN @ Rp. 39,000.00 = Rp. 624,000.00
8.0000 bh Spring Clips @ Rp. 80,000.00 = Rp. 640,000.00
Jumlah ( a ) = Rp. 4,504,144.00
Pekerjaan Joint (fishplate)
b. Upah
0.2850 oh Tukang @ Rp. 75,000.00 = Rp. 21,375.00
Jumlah ( b ) = Rp. 21,375.00
c. Bahan
2.0000 set Plat sambung UIC 54 @ Rp. 2,265,000.00 = Rp. 4,530,000.00
12.0000 bh Baut sambung @ Rp. 70,000.00 = Rp. 840,000.00
Jumlah ( c ) = Rp. 5,370,000.00
Jumlah ( a + b + c ) = Rp. 9,895,519.00
Dibulatkan = Rp. 9,895,500.00

3 Ecer Bantalan Beton Beserta alat penambat /btg


a. Upah
0.3700 oh Pekerja @ Rp. 66,000.00 = Rp. 24,420.00
0.0300 oh Mandor @ Rp. 98,000.00 = Rp. 2,940.00
Jumlah ( a ) = Rp. 27,360.00
b. Peralatan
1.0000 m3 Alat bantu (pikulan, Tali, dll) @ Rp. 10,000.00 = Rp. 10,000.00
Jumlah ( b ) = Rp. 10,000.00
Jumlah ( a + b ) = Rp. 37,360.00
Dibulatkan = Rp. 37,300.00

2.2.2. KONSTRUKSI JALAN KA


1 Pengadaan dan pengeceran balas /m3
a. Upah
0.2387 oh Pekerja @ Rp. 66,000.00 = Rp. 15,754.20
0.0627 oh Mandor @ Rp. 98,000.00 = Rp. 6,144.60
Jumlah ( a ) = Rp. 21,898.80
b. Bahan
1.0000 m3 Balas kricak uk.2x6 @ Rp. 230,000.00 = Rp. 230,000.00
Jumlah ( b ) = Rp. 230,000.00
c. Peralatan
1.0000 ton Angkutan ke lokasi dengan Truck @ Rp. 100,000.00 = Rp. 100,000.00
Jumlah ( c ) = Rp. 100,000.00
Jumlah ( a + b + c ) = Rp. 351,898.80
Dibulatkan = Rp. 351,800.00

2 Pemasangan track R.54 dengan pemecokan awal /m'sp


Menyetel spoor dengan bantalan beton R.54
a. Upah
2.2620 oh Pekerja @ Rp. 66,000.00 = Rp. 149,292.00
0.0836 oh Mandor @ Rp. 98,000.00 = Rp. 8,192.80
Jumlah ( a ) = Rp. 157,484.80

b. Tamping Awal dengan HTT Pada Bantalan Beton untuk kec. KA 20 km / jam dari kec. KA 5 km / jam
0.0380 oh Mandor @ Rp. 98,000.00 = Rp. 3,724.00
0.3800 oh Pekerja @ Rp. 66,000.00 = Rp. 25,080.00
Jumlah ( b ) = Rp. 28,804.00
c. Tamping Awal dengan HTT Pada Bantalan Beton untuk kec. KA 40 km / jam dari kec. KA 20 km / jam
0.1383 oh Mandor @ Rp. 98,000.00 = Rp. 13,553.40
0.4932 oh Pekerja @ Rp. 66,000.00 = Rp. 32,551.20
Jumlah ( c ) = Rp. 46,104.60

Jumlah ( a + b + c ) = Rp. 232,393.40


Dibulatkan = Rp. 232,300.00

3 MTT /m'sp
Untuk kec. KA > 60 km/jam
a. Upah
0.3500 oh Pekerja @ Rp. 66,000.00 = Rp. 23,100.00
0.0350 oh Juru ukur (optik) @ Rp. 115,000.00 = Rp. 4,025.00
Jumlah ( a ) = Rp. 27,125.00
b. Peralatan
3.0000 kali Biaya operasional MTT @ Rp. 35,000.00 = Rp. 105,000.00
Jumlah ( b ) = Rp. 105,000.00
Jumlah ( a + b ) = Rp. 132,125.00
Dibulatkan = Rp. 132,100.00

4 PBR /m'sp
Untuk kec. KA > 60 km/jam
a. Peralatan
1.0000 kali Biaya operasional PBR @ Rp. 7,000.00 = Rp. 7,000.00
Jumlah ( a ) = Rp. 7,000.00
Dibulatkan = Rp. 7,000.00

5 Pengelasan flash butt R.54 /ttk = Rp. 3,450,000.00

2.3. PENDUKUNG JALUR DAN BANGUNAN


2.3.1. PAPAN INFORMASI KONSTRUKSI
1 Patok KM-HM /bh
a. Upah
2.0000 oh Pekerja @ Rp. 66,000.00 = Rp. 132,000.00
0.0180 oh Tukang @ Rp. 75,000.00 = Rp. 1,350.00
4.0000 oh Mandor @ Rp. 98,000.00 = Rp. 392,000.00
Jumlah ( a ) = Rp. 525,350.00
b. Bahan
0.0500 m3 Beton K-250 @ Rp. 953,500.00 = Rp. 47,675.00
7.8750 kg Besi beton @ Rp. 13,900.00 = Rp. 109,462.50
0.0800 m3 Beton K-175 @ Rp. 883,000.00 = Rp. 70,640.00
1.0000 ls Cat, dan material lainnya @ Rp. 80,000.00 = Rp. 80,000.00
Jumlah ( b ) = Rp. 307,777.50
c. Peralatan
0.1050 jam Sewa Dump truck 5 ton @ Rp. 135,000.00 = Rp. 14,175.00
Jumlah ( c ) = Rp. 14,175.00
Jumlah ( a + b + c ) = Rp. 847,302.50
Dibulatkan = Rp. 847,300.00

2 Tanda-tanda lintas /set


Patok rel (lengkung peralihan dan preipal) pasang, cor beton
a. Upah
0.1110 oh Pekerja @ Rp. 66,000.00 = Rp. 7,326.00
0.0660 oh Tukang @ Rp. 75,000.00 = Rp. 4,950.00
0.0220 oh Mandor @ Rp. 98,000.00 = Rp. 2,156.00
Jumlah ( a ) = Rp. 14,432.00
b. Bahan
0.0500 kg Besi Plat @ Rp. 14,500.00 = Rp. 725.00
7.8750 btg Rel R. 42 bekas (angkut, potong, las) @ Rp. 150,000.00 = Rp. 1,181,250.00
0.0800 m3 Beton K-175 @ Rp. 883,000.00 = Rp. 70,640.00
1.0000 ls Cat, dan material lainnya @ Rp. 80,000.00 = Rp. 80,000.00
Jumlah ( b ) = Rp. 1,332,615.00
c. Peralatan
0.0920 jam Sewa Dump truck 5 ton @ Rp. 135,000.00 = Rp. 12,420.00
Jumlah ( c ) = Rp. 12,420.00
Jumlah ( a + b + c ) = Rp. 1,359,467.00
Dibulatkan = Rp. 1,359,400.00

3 Pemasangan pagar sterilisasi panel beton t=120 cm /m'


Pengadaan dan pemasangan pagar panel beton t=2m, untuk 3 m'
a. Upah
5.0800 oh Pekerja @ Rp. 66,000.00 = Rp. 335,280.00
2.8000 oh Tukang besi @ Rp. 75,000.00 = Rp. 210,000.00
3.1800 oh Tukang batu @ Rp. 75,000.00 = Rp. 238,500.00
1.5000 oh Mandor @ Rp. 98,000.00 = Rp. 147,000.00
Jumlah ( a ) = Rp. 930,780.00
b. Bahan
0.2900 jam Beton K.250 @ Rp. 953,500.00 = Rp. 276,515.00
0.2900 jam Bekisting @ Rp. 392,400.00 = Rp. 113,796.00
31.9000 jam Pembesian @ Rp. 13,900.00 = Rp. 443,410.00
0.0800 jam Pasir urug @ Rp. 170,700.00 = Rp. 13,656.00
0.0800 jam Beton K.175 @ Rp. 883,000.00 = Rp. 70,640.00
3.0000 jam Beton precast 5x40x300 @ Rp. 210,000.00 = Rp. 630,000.00
1.0600 jam Beton precast 18x20x200 @ Rp. 250,000.00 = Rp. 265,000.00
Jumlah ( b ) = Rp. 1,813,017.00
c. Peralatan
0.2500 ls Alat bantu penyangga @ Rp. 300,000.00 = Rp. 75,000.00
0.2500 ls Chain block kapasitas 2 ton @ Rp. 1,500,000.00 = Rp. 375,000.00
1.0000 ls Alat bantu lain (mesin las, bor, genset, dll) @ Rp. 300,000.00 = Rp. 300,000.00
0.1700 rit Transport ke lapangan \ u/ pek. panel @ Rp. 100,000.00 = Rp. 17,000.00
Jumlah ( c ) = Rp. 767,000.00
Jumlah ( a + b + c ) = Rp. 3,510,797.00
Untuk per m' 1,170,265.67
Dibulatkan = Rp. 1,170,200.00

2.7. JEMBATAN

c. Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 /m3
a. Upah
1.6500 oh Pekerja @ Rp. 66,000.00 = Rp. 108,900.00
0.2750 oh Tukang @ Rp. 75,000.00 = Rp. 20,625.00
0.0280 oh Kepala tukang @ Rp. 87,000.00 = Rp. 2,436.00
0.0830 oh Mandor @ Rp. 98,000.00 = Rp. 8,134.00
Jumlah ( a ) = Rp. 140,095.00
b. Bahan
326.0000 kg Semen PC /kg @ Rp. 1,380.00 = Rp. 449,880.00
0.5717 m3 Batu pecah 2/3 @ Rp. 240,000.00 = Rp. 137,208.00
0.5429 m3 Pasir beton @ Rp. 225,000.00 = Rp. 122,152.50
0.2150 m3 Air @ Rp. 157,000.00 = Rp. 33,755.00
Jumlah ( b ) = Rp. 742,995.50
Jumlah ( a + b ) = Rp. 883,090.50
Dibulatkan = Rp. 883,000.00

d. Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 /m3
a. Upah
2.1000 oh Pekerja @ Rp. 66,000.00 = Rp. 138,600.00
0.3500 oh Tukang @ Rp. 75,000.00 = Rp. 26,250.00
0.0350 oh Kepala tukang @ Rp. 87,000.00 = Rp. 3,045.00
0.1050 oh Mandor @ Rp. 98,000.00 = Rp. 10,290.00
Jumlah ( a ) = Rp. 178,185.00
b. Bahan
448.0000 kg Semen PC /kg @ Rp. 1,380.00 = Rp. 618,240.00
0.5556 m3 Batu pecah 2/3 @ Rp. 240,000.00 = Rp. 133,344.00
0.4764 m3 Pasir beton @ Rp. 225,000.00 = Rp. 107,190.00
0.2150 m3 Air @ Rp. 157,000.00 = Rp. 33,755.00
Jumlah ( b ) = Rp. 892,529.00
Jumlah ( a + b ) = Rp. 1,070,714.00
Dibulatkan = Rp. 1,070,700.00

g. Structural Backfill /m3


a. Upah
0.0102 oh Pekerja @ Rp. 66,000.00 = Rp. 673.20
0.0025 oh Mandor @ Rp. 98,000.00 = Rp. 245.00
Jumlah ( a ) = Rp. 918.20
b. Bahan
1.2000 m3 Tanah pilihan @ Rp. 39,000.00 = Rp. 46,800.00
Jumlah ( b ) = Rp. 46,800.00
c. Peralatan
0.0178 jam Sewa Wheel loader @ Rp. 225,000.00 = Rp. 4,005.00
0.2289 jam Sewa Dump truck 5 ton @ Rp. 135,000.00 = Rp. 30,901.50
0.0061 jam Sewa Motor Grider @ Rp. 255,000.00 = Rp. 1,555.50
0.0010 jam Sewa Vibrator roller @ Rp. 112,500.00 = Rp. 112.50
0.0070 jam Sewa Water tanker @ Rp. 235,000.00 = Rp. 1,645.00
Jumlah ( c ) = Rp. 38,219.50
Jumlah ( a + b + c ) = Rp. 85,937.70
Dibulatkan = Rp. 85,900.00

1. 'PEKERJAAN PONDASI

1 Axial Loading Test (Static Load Test) = Rp. 25,000,000.00

2 Lateral Loading Test = Rp. 25,000,000.00

PONDASI ABUTMENT
1 Bore pile dia 800mm
Bore pile dia. 80cm, L=6m
a Upah
0.0960 oh Pekerja @ Rp. 66,000.00 = Rp. 6,336.00
0.0480 oh Mandor @ Rp. 98,000.00 = Rp. 4,704.00
Jumlah a = Rp. 11,040.00
b Peralatan
0.2500 jam Sewa Alat Bored Pile @ Rp. 6,500,000.00 = Rp. 1,625,000.00
1.0000 ls Air Kerja @ Rp. 50,000.00 = Rp. 50,000.00
Jumlah b = Rp. 1,675,000.00
Jumlah a+b = Rp. 1,686,040.00
= Rp. 1,686,000.00

2 Beton Mutu tinggi /c'30 pada borepile


a. Upah
2.1000 oh Pekerja @ Rp. 66,000.00 = Rp. 138,600.00
0.3500 oh Tukang @ Rp. 75,000.00 = Rp. 26,250.00
0.0350 oh Kepala tukang @ Rp. 87,000.00 = Rp. 3,045.00
0.1050 oh Mandor @ Rp. 98,000.00 = Rp. 10,290.00
Jumlah ( a ) = Rp. 178,185.00
b. Bahan
448.0000 kg Semen PC /kg @ Rp. 1,380.00 = Rp. 618,240.00
0.5556 m3 Batu pecah 2/3 @ Rp. 240,000.00 = Rp. 133,344.00
0.4764 m3 Pasir beton @ Rp. 225,000.00 = Rp. 107,190.00
0.2150 m3 Air @ Rp. 157,000.00 = Rp. 33,755.00
Jumlah ( b ) = Rp. 892,529.00
Jumlah ( a + b ) = Rp. 1,070,714.00
Dibulatkan = Rp. 1,070,700.00

2. PEKERJAAN ABUTMEN

2 Beton Mutu Rendah fc' 15 Lantai kerja


a. Upah
1.6500 oh Pekerja @ Rp. 66,000.00 = Rp. 108,900.00
0.2750 oh Tukang @ Rp. 75,000.00 = Rp. 20,625.00
0.0280 oh Kepala tukang @ Rp. 87,000.00 = Rp. 2,436.00
0.0830 oh Mandor @ Rp. 98,000.00 = Rp. 8,134.00
Jumlah ( a ) = Rp. 140,095.00
b. Bahan
326.0000 kg Semen PC /kg @ Rp. 1,380.00 = Rp. 449,880.00
0.5717 m3 Batu pecah 2/3 @ Rp. 240,000.00 = Rp. 137,208.00
0.5429 m3 Pasir beton @ Rp. 225,000.00 = Rp. 122,152.50
0.2150 m3 Air @ Rp. 157,000.00 = Rp. 33,755.00
Jumlah ( b ) = Rp. 742,995.50
Jumlah ( a + b ) = Rp. 883,090.50
Dibulatkan = Rp. 883,000.00

3 Beton Mutu tinggi fc' 30 pada Pile cap


a. Upah
2.1000 oh Pekerja @ Rp. 66,000.00 = Rp. 138,600.00
0.3500 oh Tukang @ Rp. 75,000.00 = Rp. 26,250.00
0.0350 oh Kepala tukang @ Rp. 87,000.00 = Rp. 3,045.00
0.1050 oh Mandor @ Rp. 98,000.00 = Rp. 10,290.00
Jumlah ( a ) = Rp. 178,185.00
b. Bahan
448.0000 kg Semen PC /kg @ Rp. 1,380.00 = Rp. 618,240.00
0.5556 m3 Batu pecah 2/3 @ Rp. 240,000.00 = Rp. 133,344.00
0.4764 m3 Pasir beton @ Rp. 225,000.00 = Rp. 107,190.00
0.2150 m3 Air @ Rp. 157,000.00 = Rp. 33,755.00
Jumlah ( b ) = Rp. 892,529.00
Jumlah ( a + b ) = Rp. 1,070,714.00
Dibulatkan = Rp. 1,070,700.00

5 Bekisting untuk Pile cap


a. Upah
0.6600 Oh Pekerja @ Rp. 66,000.00 = Rp. 43,560.00
0.3300 Oh Tukang kayu @ Rp. 75,000.00 = Rp. 24,750.00
0.0330 Oh Kepala tukang @ Rp. 87,000.00 = Rp. 2,871.00
0.0330 Oh Mandor @ Rp. 98,000.00 = Rp. 3,234.00
Jumlah a = Rp. 74,415.00
b. Bahan
0.0300 m3 Kayu klas III @ Rp. 3,575,000.00 = Rp. 107,250.00
0.4000 kg Paku campur @ Rp. 16,000.00 = Rp. 6,400.00
0.2000 liter Minyak begisting @ Rp. 18,000.00 = Rp. 3,600.00
0.0200 m3 Kayu klas II @ Rp. 4,500,000.00 = Rp. 90,000.00
0.3500 lbr Plywood 9 mm @ Rp. 145,000.00 = Rp. 50,750.00
3.0000 btg Kayu Dolken dia 8-10 cm @ Rp. 20,000.00 = Rp. 60,000.00
Jumlah b = Rp. 318,000.00
Jumlah a + b = Rp. 392,415.00
Dibulatkan = Rp. 392,400.00

6 Bekisting untuk Abutmen


a. Upah
0.6600 Oh Pekerja @ Rp. 66,000.00 = Rp. 43,560.00
0.3300 Oh Tukang kayu @ Rp. 75,000.00 = Rp. 24,750.00
0.0330 Oh Kepala tukang @ Rp. 87,000.00 = Rp. 2,871.00
0.0330 Oh Mandor @ Rp. 98,000.00 = Rp. 3,234.00
Jumlah a = Rp. 74,415.00
b. Bahan
0.0400 m3 Kayu klas III @ Rp. 3,575,000.00 = Rp. 143,000.00
0.4000 kg Paku campur @ Rp. 16,000.00 = Rp. 6,400.00
0.2000 liter Minyak begisting @ Rp. 18,000.00 = Rp. 3,600.00
0.0150 m3 Kayu klas II @ Rp. 4,500,000.00 = Rp. 67,500.00
0.3500 lbr Plywood 9 mm @ Rp. 145,000.00 = Rp. 50,750.00
6.0000 btg Kayu Dolken dia 8-10 cm @ Rp. 20,000.00 = Rp. 120,000.00
Jumlah b = Rp. 391,250.00
Jumlah a + b = Rp. 465,665.00
Dibulatkan = Rp. 465,600.00

7 Bekisting untuk Pelat Injak


a. Upah
0.6600 Oh Pekerja @ Rp. 66,000.00 = Rp. 43,560.00
0.3300 Oh Tukang kayu @ Rp. 75,000.00 = Rp. 24,750.00
0.0330 Oh Kepala tukang @ Rp. 87,000.00 = Rp. 2,871.00
0.0330 Oh Mandor @ Rp. 98,000.00 = Rp. 3,234.00
Jumlah a = Rp. 74,415.00
b. Bahan
0.0300 m3 Kayu klas III @ Rp. 3,575,000.00 = Rp. 107,250.00
0.4000 kg Paku campur @ Rp. 16,000.00 = Rp. 6,400.00
0.2000 liter Minyak begisting @ Rp. 18,000.00 = Rp. 3,600.00
0.0200 m3 Kayu klas II @ Rp. 4,500,000.00 = Rp. 90,000.00
0.3500 lbr Plywood 9 mm @ Rp. 145,000.00 = Rp. 50,750.00
2.0000 btg Kayu Dolken dia 8-10 cm @ Rp. 20,000.00 = Rp. 40,000.00
Jumlah b = Rp. 298,000.00
Jumlah a + b = Rp. 372,415.00
Dibulatkan = Rp. 372,400.00

8 Bekisting untuk Wing wall


a. Upah
0.6600 Oh Pekerja @ Rp. 66,000.00 = Rp. 43,560.00
0.3300 Oh Tukang kayu @ Rp. 75,000.00 = Rp. 24,750.00
0.0330 Oh Kepala tukang @ Rp. 87,000.00 = Rp. 2,871.00
0.0330 Oh Mandor @ Rp. 98,000.00 = Rp. 3,234.00
Jumlah a = Rp. 74,415.00
b. Bahan
0.0300 m3 Kayu klas III @ Rp. 3,575,000.00 = Rp. 107,250.00
0.4000 kg Paku campur @ Rp. 16,000.00 = Rp. 6,400.00
0.2000 liter Minyak begisting @ Rp. 18,000.00 = Rp. 3,600.00
0.0200 m3 Kayu klas II @ Rp. 4,500,000.00 = Rp. 90,000.00
0.3500 lbr Plywood 9 mm @ Rp. 145,000.00 = Rp. 50,750.00
3.0000 btg Kayu Dolken dia 8-10 cm @ Rp. 20,000.00 = Rp. 60,000.00
Jumlah b = Rp. 318,000.00
Jumlah a + b = Rp. 392,415.00
Dibulatkan = Rp. 392,400.00

3. 'PEKERJAAN DECK
1 Beton Mutu tinggi fc' 35 = Rp. 1,070,700.00

4. 'I GIRDER

1 Pengadaan & Pemasangan I Girder L = 40 m = Rp. 410,400,500.00

2 Beton K.350
a. Upah
2.1000 oh Pekerja @ Rp. 66,000.00 = Rp. 138,600.00
0.3500 oh Tukang @ Rp. 75,000.00 = Rp. 26,250.00
0.0350 oh Kepala tukang @ Rp. 87,000.00 = Rp. 3,045.00
0.1050 oh Mandor @ Rp. 98,000.00 = Rp. 10,290.00
Jumlah ( a ) = Rp. 178,185.00
b. Bahan
448.0000 kg Semen PC /kg @ Rp. 1,380.00 = Rp. 618,240.00
0.5556 m3 Batu pecah 2/3 @ Rp. 240,000.00 = Rp. 133,344.00
0.4764 m3 Pasir beton @ Rp. 225,000.00 = Rp. 107,190.00
0.2150 m3 Air @ Rp. 157,000.00 = Rp. 33,755.00
Jumlah ( b ) = Rp. 892,529.00
Jumlah ( a + b ) = Rp. 1,070,714.00
Dibulatkan = Rp. 1,070,700.00

4 Bekisting untuk diagframa


Pasang bekisting untuk dinding(m2) (SNI 7394-2008-25)
a. Upah
0.6600 oh Pekerja @ Rp. 66,000.00 = Rp. 43,560.00
0.3300 oh Tukang kayu @ Rp. 75,000.00 = Rp. 24,750.00
0.0330 oh Kepala tukang kayu @ Rp. 87,000.00 = Rp. 2,871.00
0.0330 oh Mandor @ Rp. 98,000.00 = Rp. 3,234.00
Jumlah ( a ) = Rp. 74,415.00
b. Bahan
0.0300 m3 Kayu klas III @ Rp. 3,575,000.00 = Rp. 107,250.00
0.4000 kg Paku @ Rp. 16,000.00 = Rp. 6,400.00
0.2000 liter Minyak begisting @ Rp. 18,000.00 = Rp. 3,600.00
0.0200 m3 Kayu klas II @ Rp. 4,500,000.00 = Rp. 90,000.00
0.3500 lbr Plywood 9 mm @ Rp. 145,000.00 = Rp. 50,750.00
3.0000 btg Kayu Dolken Dia 8 cm @ Rp. 20,000.00 = Rp. 60,000.00
Jumlah ( b ) = Rp. 318,000.00
Jumlah ( a + b ) = Rp. 392,415.00
Dibulatkan = Rp. 392,400.00

5. 'BEARING
Pekerjaan Pengadaan & Pemasangan Bearing

1 Pengadaan dan pemasangan elastomer bearing = Rp. 3,500,000.00

6. 'EXPANSION JOINT
Pekerjaan Pengadaan & Pemasangan Expansion Joint

1 Aspalthic Join = Rp. 50,000.00

1 Jaga malam peralatan kerja dan mesin - mesin

6.0000 oh Pekerja @ Rp. 66,000.00 = Rp. 396,000.00


Jumlah Rp. 396,000.00
Dibulatkan Rp. 396,000.00

2 Relokasi Tiang Listrik

1.0000 ls Relokasi Tiang PLN @ Rp. 10,635,000.00 = Rp. 10,635,000.00


( Berdasarkan Surat Dari PT. PLN) Jumlah Rp. 10,635,000.00
Dibulatkan Rp. 10,635,000.00

3 Pembongkaran Bangunan
untuk tiap 1 m2 :
Upah
2.00 oh Pekerja @ Rp. 66,000.00 = Rp. 132,000.00
0.03 oh Mandor @ Rp. 98,000.00 = Rp. 2,940.00
Alat
0.514 Jam Sewa Dumtruck @ Rp. 135,000.00 = Rp. 69,390.00
0.273 Jam sewa Excavator @ Rp. 230,000.00 = Rp. 62,790.00
Jumlah Rp. 267,120.00
Dibulatkan Rp. 267,100.00

PEKERJAAN TAMBAH KURANG ADD II

1 Sondering Test ≥ 150 Kg/Cm²

10.0000 ttk @ Rp. 2,000,000.00 = Rp. 20,000,000.00


Jumlah Rp. 20,000,000.00
Dibulatkan Rp. 20,000,000.00

Menyetujui : Diperiksa Dan Disetujui Oleh : Dibuat Oleh :


BALAI TEKNIK PERKERETAAPIAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH SUMATERA BAGIAN UTARA PT. HARAWANA CONSULTANT PT. DWIFARITA FAJARKHARISMA
PPK ACEH

HENDRI UTAMA JOHN F SITOMPUL, ST SAMSUL HIDAYAT, ST


Pengawas Team Leader Project Manager

Menyetujui : Menyetujui :
BALAI TEKNIK PERKERETAAPIAN BALAI TEKNIK PERKERETAAPIAN
WILAYAH SUMATERA BAGIAN UTARA WILAYAH SUMATERA BAGIAN UTARA
PPK ACEH PPK ACEH

AKHMAD AFIF SETIAWAN AWAL MANSUR


NIP. 19840810 201012 1 001 Koordinator Pengawas
VOLUME MINGGU
SATUAN BOBOT (%) SKALA MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 11 ADD KONTRAK BOBOT MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20 MINGGU 21 MINGGU 22 MINGGU 23 MINGGU 24 MINGGU 25 MINGGU 26 MINGGU 27 MINGGU 28 MINGGU 29 MINGGU 30 MINGGU 31 MINGGU 32 MINGGU 33 MINGGU 34 ADD KONTRAK BOBOT MINGGU 35 MINGGU 36 MINGGU 37 MINGGU 38 MINGGU 39 MINGGU 40 MINGGU 41 MINGGU 42 MINGGU 43 MINGGU 44 MINGGU 45 MINGGU 46 MINGGU 47 MINGGU 48 MINGGU 49 MINGGU 50 MINGGU 51 MINGGU 52 MINGGU 53 MINGGU 54 MINGGU 55 MINGGU 56 MINGGU 57 MINGGU 58 MINGGU 59 MINGGU 60 MINGGU 61 MINGGU 62 MINGGU 63 MINGGU 64 MINGGU 65
Uraian Sub Output / Sub Output 10
REALISASI S.D
Komponen Sub Komponen Detail 04/09/2017 11/09/2017 18/09/2017 25/09/2017 02/10/2017 09/10/2017 16/10/2017 23/10/2017 30/10/2017 06/11/2017 13/11/2017 REALISASI S.D MINGGU 11 VOLUME ACTUAL SISA 20/11/2017 27/11/2017 04/12/2017 11/12/2017 18/12/2017 25/12/2017 01/01/2018 08/01/2018 15/01/2018 22/01/2018 29/01/2018 05/02/2018 12/02/2018 19/02/2018 26/02/2018 05/03/2018 12/03/2018 19/03/2018 26/03/2018 02/04/2018 09/04/2018 16/04/2018 23/04/2018 VOLUME ACTUAL 30/04/2018 07/05/2018 14/05/2018 21/05/2018 28/05/2018 04/06/2018 11/06/2018 18/06/2018 25/06/2018 02/07/2018 09/07/2018 16/07/2018 23/07/2018 30/07/2018 06/08/2018 13/08/2018 20/08/2018 27/08/2018 03/09/2018 10/09/2018 17/09/2018 24/09/2018 01/10/2018 08/10/2018 15/10/2018 22/10/2018 29/10/2018 05/11/2018 12/11/2018 19/11/2018 26/11/2018
MINGGU 34 SISA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
10/09/2017 17/09/2017 24/09/2017 01/10/2017 08/10/2017 15/10/2017 22/10/2017 29/10/2017 05/11/2017 12/11/2017 19/11/2017 26/11/2017 03/12/2017 10/12/2017 17/12/2017 24/12/2017 31/12/2017 07/01/2018 14/01/2018 21/01/2018 28/01/2018 04/02/2018 11/02/2018 18/02/2018 25/02/2018 04/03/2018 11/03/2018 18/03/2018 25/03/2018 01/04/2018 08/04/2018 15/04/2018 22/04/2018 29/04/2018 06/05/2018 13/05/2018 20/05/2018 27/05/2018 03/06/2018 10/06/2018 17/06/2018 24/06/2018 01/07/2018 08/07/2018 15/07/2018 22/07/2018 29/07/2018 05/08/2018 12/08/2018 19/08/2018 26/08/2018 02/09/2018 09/09/2018 16/09/2018 23/09/2018 30/09/2018 07/10/2018 14/10/2018 21/10/2018 28/10/2018 04/11/2018 11/11/2018 18/11/2018 25/11/2018 02/12/2018

UMUM

1.1. DESAIN, SURVEI, DAN PERIJINAN


100
1.1.1. DESAIN, SURVEI, DAN PERIJINAN
1 Pengukuran topography m2 90,000.00 0.25443 0.0688 0.0688 0.0688 0.0688 0.07464 90,000.00 m2 0.2544 0.1798 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.19787 90,000.00 m2 0.25443 0.05656 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082
2 Pembuatan shop drawing dan asbuilt drawing set 2.00 0.06425 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.00869 2.00 set 0.0642 0.0556 0.03212 2.00 set 0.06425 0.03212

3 Penyelidikan tanah
a. DCP ttk 30.00 0.00385 0.00008 0.00008 0.00008 0.00412 30.00 ttk 0.0039 - 0.0003 - 0.00009 - 0.00009 - 0.00009 0.00385 30.00 ttk 0.00385 -
b. Sand Cone ttk 445.00 0.08577 0.00164 0.00164 0.00164 - 445.00 ttk 0.0858 0.0858 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.02679 400.00 ttk 0.07710 0.05031
c. Plat Bearing ttk 60.00 0.02120 0.00045 0.00045 0.00045 - 60.00 ttk 0.0212 0.0212 - 60.00 ttk 0.02120 0.02120
d. Penyelidikan sampel quarry ttk 6.00 0.01542 0.0042 0.0042 0.0042 0.0042 0.00556 6.00 ttk 0.0154 0.0099 0.00164 0.00164 0.00164 0.00164 0.00164 0.00164 0.00514 6.00 ttk 0.01542 0.01028 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171
e. Soundering test ttk 10.00 0.02409 ttk 0.02409 10.00 ttk 0.02409 - -
1.2. MANAJEMEN LAPANGAN
1.2.1. ADMINISTRASI LAPANGAN
1 Dokumentasi bln 24.00 0.04626 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00491 24.00 bln 0.0463 0.0414 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.01371 24.00 bln 0.04626 0.03255 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047
2 Jaga malam,peralatan kerja dan mesin - mesin oh 720.00 0.36638 - 720.00 oh 0.3664 0.3664 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.12111 720.00 oh 0.36638 0.24527 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355
1.2.2. OPERASIONAL KANTOR LAPANGAN
1 Membuat dan membongkar direksi keet, los kerja, dan guda m2 108.00 0.06556 0.0177 0.0177 0.05914 108.00 m2 0.0656 0.0064 0.05463 108.00 m2 0.06556 0.01093
2 Papan nama pekerjaan m2 4.00 0.00370 0.0040 0.00401 4.00 m2 0.0037 - 0.00031 - 0.00031 0.00370 4.00 m2 0.00370 -
3 Operasional direksikeet set 1.00 0.03212 0.0348 0.02608 1.00 set 0.0321 0.0060 0.03212 1.00 set 0.03212 -

1.3. MOBILISASI DAN DEMOBILISASI


1.3.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
1 Mobilisasi dan demobilisasi Peralatan Berat pkt 1.00 0.12850 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.06954 1.00 pkt 0.1285 0.0590 0.0642 1.00 pkt 0.12850 0.06425
2 Perbaikan jalan akses masyarakat m2 3,920.00 0.76212 - 3,920.00 m2 0.7621 0.7621 - 3,600.00 m2 0.69991 0.69991
3. Relokasi tiang PLN ttk 14.00 0.19132 14.00 ttk 0.1913 0.1913 0.0957 0.0957 0.1913 14.00 ttk 0.19132 -
JALUR DAN BANGUNAN
2.1. SIPIL
2.1.1 Pekerjaan Persiapan
1 Pembersihan lapangan dan perataan m2 71,138.20 0.26509 0.0465 0.0465 0.0465 0.28694 71,138.20 m2 0.2651 - 0.0218 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 0.26509 71138.2008 m2 0.26509 -
2 Pembongkaran bangunan m2 1,920.00 0.65899 1,920.00 m2 0.6590 0.6590 0.16475 0.16475 0.16475 0.16475 0.65899 1920.00 m2 0.65899 -
2.1.2. PERBAIKAN TANAH DASAR
1 Perkuatan dengan geotekstile m2 12,500.00 3.83249 0.1106 0.1106 0.1106 - 12,500.00 m2 3.8325 3.8325 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 2.91269 12,500.00 m2 3.83249 0.91980

2.1.2. KONSTRUKSI TUBUH BAAN


1 Stripping / pengupasan lapisan tanah dasar mak 50cm m2 37,946.70 0.71191 0.0197 0.0197 0.0197 0.56679 37,946.70 m2 0.7119 0.1451 0.1451 0.52363 27,910.93 m2 0.52363 -
2 Timbunan dengan material tanah pilihan m3 154,783.87 20.96365 0.30599 0.30599 0.30599 0.51310 154,783.87 m3 20.9637 20.4506 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 13.58909 155,308.556 m3 21.03472 7.44562
70
3 Timbunan dengan sirtu (sub balas) m3 8,214.25 1.46401 - 8,214.25 m3 1.4640 1.4640 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 - 8,214.25 m3 1.46401 1.46401
4 Galian tanah dengan alat berat m3 31,751.49 1.85642 0.2325 0.2325 0.2325 0.07229 31,751.49 m3 1.8564 1.7841 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.92255 36,035.35 m3 2.10688 1.18434
5 Membuang Tanah sejauh 30 m m3 31,751.49 0.70993 0.0889 0.0889 0.0889 0.01075 31,751.49 m3 0.7099 0.6992 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.34888 36,035.35 m3 0.80571 0.45683

2.1.2. DRAINASE
1 Drainase beton pracetak 80x80 cm tebal 10 cm m' 3,362.40 7.39092 - 3,362.40 m' 7.3909 7.3909 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 - 3,351.00 m' 7.36586 7.36586 - -

2 Retaining wall
Galian Tanah m3 15,287.04 0.89379 - 15,287.04 m3 0.8938 0.8938 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.27922 15,004.76 m3 0.87729 0.59807 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120
Pasangan batu kosong m3 1,488.54 0.55260 - 1,488.54 m3 0.5526 0.5526 0.0089 0.0089 0.0089 0.0089 0.0089 0.0089 0.31404 1,436.76 m3 0.53337 0.21933 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m2 744.27 0.84449 - 744.27 m2 0.8445 0.8445 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.43022 718.38 m2 0.81511 0.38488 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069
Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 m3 9,930.52 12.16727 - 9,930.52 m3 12.1673 12.1673 0.1962 0.1962 0.1962 0.1962 0.1962 0.1962 3.15151 9,520.03 m3 11.66433 8.51281 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520
Pembesian dengan besi ulir m3 830,160.18 14.82782 - 830,160.18 m3 14.8278 14.8278 0.2392 0.2392 0.2392 0.2392 0.2392 0.2392 6.32121 809,155.34 kg 14.45265 8.13144 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452
Urugan pasir m3 744.27 0.16325 - 744.27 m3 0.1633 0.1633 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.08317 718.38 m3 0.15758 0.07441 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
Bekisting m2 21,675.20 10.92931 - 21,675.20 m2 10.9293 10.9293 0.1763 0.1763 0.1763 0.1763 0.1763 0.1763 2.43521 20,652.24 m2 10.41350 7.97829 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425

2.2 JALAN REL


2.2.1. MATERIAL JALAN KA
1 Angkutan rel ton 324.00 0.37354 - 324.00 ton 0.3735 0.3735 - 324.00 ton 0.37354 0.37354
2 Bantalan Kayu untuk MJ lengkap dengan aksesoris ttk 40.00 0.50863 - 40.00 ttk 0.5086 0.5086 - 40.00 ttk 0.50863 0.50863

3 Ecer Bantalan Beton Beserta alat penambat btg 4,834.00 0.23169 - 4,834.00 btg 0.2317 0.2317 - 4834.00 btg 0.23169 0.23169
4 Angkutan Bantalan Beton Lengkap Dengan Alat Penambat Elastis /btg btg 4,834.00 0.37084

2.2.2. KONSTRUKSI JALAN KA


1 Pengadaan dan pengeceran balas m3 4,785.00 2.1631 - 4,785.00 m3 2.1631 2.1631 - 4785.00 m3 2.16311 2.16311

2 Pemasangan track R.54 dengan pemecokan awal m'sp 2,900.00 0.8657 - 2,900.00 m'sp 0.8657 0.8657 - 2900.00 m'sp 0.86566 0.86566
3 MTT msp 2,900.00 0.4923 - 2,900.00 msp 0.4923 0.4923 - 2900.00 msp 0.49227 0.49227
4 PBR msp 2,900.00 0.0261 - 2,900.00 msp 0.0261 0.0261 - 2900.00 msp 0.02609 0.02609
5 Pengelasan flash butt R.54 titik 192.00 0.8512 - 192.00 titik 0.8512 0.8512 - 192.00 titik 0.85118 0.85118

2.3. PENDUKUNG JALUR DAN BANGUNAN


50
2.3.1. PAPAN INFORMASI KONSTRUKSI
1 Patok KM-HM buah 30.00 0.0327 - 30.00 buah 0.0327 0.0327 - 30.00 buah 0.03266 0.03266
2 Tanda-tanda lintas set 1.00 0.0017 - 1.00 set 0.0017 0.0017 - 1.00 set 0.00175 0.00175
50
3 Pemasangan pagar sterilisasi panel beton t=120 cm m' 3,000.00 4.5111 - 3,000.00 m' 4.5111 4.5111 0.09398 0.09398 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 4.51110 3,000.00 m' 4.51110 -

2.7. JEMBATAN

1 Underpass akses masyarakat uk. 6x5,5 (2 unit)


2 Box Culvert uk. 4x4 (1 unit)
3 Jembatan Perlintasan Jalan Nasional
1. 'PEKERJAAN PONDASI
2. PEKERJAAN ABUTMEN
3. 'PEKERJAAN DECK
4. 'I GIRDER
5. 'BEARING
6. 'EXPANSION JOINT

Box Culvert uk. 1x1 (2 unit)


Galian Tanah m3 84.49 0.0049 - 84.49 m3 0.00494 0.00494 0.00247 0.00247
Pasangan batu kosong m3 10.49 0.0039 - 6.60 m3 0.00245 0.00245 0.00245
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.20 0.0070 - 3.30 m3 0.00374 0.00374 0.00374
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 45.66 0.0628 - 80.48 m3 0.11073 0.11073 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384
Pembesian dengan besi ulir kg 5,447.89 0.0973 - 7,034.97 kg 0.12565 0.12565 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571
Urugan pasir m3 6.20 0.0014 - 3.30 m3 0.00072 0.00072 0.00072
Structural Backfill m3 64.35 0.0071 - 64.35 m3 0.00710 0.00710 0.00355 0.00355
Bekisting m2 237.96 0.1200 - 347.64 m2 0.17529 0.17529 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191

Box Culvert Uk. 2x2 (12 unit)


Galian Tanah m3 2,413.94 0.1411 - 2,488.42 m3 0.14549 0.14549 0.03637 0.03637 0.03637 0.03637
Pasangan batu kosong m3 138.68 0.0515 - 126.10 m3 0.04681 0.04681 0.00585 0.00585 0.00585 0.00585 0.00585 0.00585
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 69.34 0.0787 - 63.05 m3 0.07154 0.07154 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 856.70 1.1787 - 1,148.23 m3 1.57978 1.57978 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319
Pembesian dengan besi ulir kg 119,199.98 2.1291 - 124,190.18 kg 2.21821 2.21821 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873
Urugan pasir m3 69.34 0.0152 - 63.05 m3 0.01383 0.01383 0.00173 0.00173 0.00173 0.00173 0.00173 0.00173
Structural Backfill m3 1,052.25 0.1161 REALISASI MINGGUAN - 1,109.44 m3 0.12246 0.12246
Bekisting m2 3,432.11 1.7306 - 4,315.16 m2 2.17584 2.17584 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703

Underpass Warga 4x4 (1 unit)


Galian Tanah m3 158.08 0.0092 - 158.08 m3 0.00924 0.00924
Pasangan batu kosong m3 12.74 0.0047 - 12.74 m3 0.00473 0.00473
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.37 0.0072 - 6.37 m3 0.00723 0.00723
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 126.99 0.1747 - 166.19 m3 0.22865 0.22865
Pembesian dengan besi ulir kg 18,079.49 0.3229 - 19,806.47 kg 0.35377 0.35377
Urugan pasir m3 6.37 0.0014 - 6.37 m3 0.00140 0.00140
Structural Backfill m3 200.85 0.0222 - 200.85 m3 0.02217 0.02217
Bekisting m2 388.05 0.1957 - 493.07 m2 0.24862 0.24862

Box Culvert Uk. 4x4x2 (1 unit)


Galian Tanah m3 420.86 0.0246 - 420.86 m3 0.02461 0.02461
Pasangan batu kosong m3 40.48 0.0150 - 40.48 m3 0.01503 0.01503
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 20.24 0.0230 - 20.24 m3 0.02297 0.02297
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 323.26 0.4448 - 346.40 m3 0.47660 0.47660
Pembesian dengan besi ulir kg 37,808.67 0.6753 - 38,738.53 kg 0.69192 0.69192
Urugan pasir m3 20.24 0.0044 - 20.24 m3 0.00444 0.00444
Structural Backfill m3 339.90 0.0375 - 339.90 m3 0.03752 0.03752
Bekisting m2 812.61 0.4097 - 1,005.77 m2 0.50714 0.50714

Box Culvert Uk. 6x4x2 (1 unit)


Galian Tanah m3 367.08 0.0215 - 138.15 m3 0.00808 0.00808
Pasangan batu kosong m3 19.88 0.0074 - 34.08 m3 0.01265 0.01265
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 9.94 0.0113 RENCANA MINGGUAN - 17.04 m3 0.01933 0.01933
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 205.10 0.2822 - 352.28 m3 0.48468 0.48468
Pembesian dengan besi ulir kg 26,062.73 0.4655 - 23,923.23 kg 0.42730 0.42730
Urugan pasir m3 9.94 0.0022 - 17.04 m3 0.00374 0.00374
Structural Backfill m3 108.15 0.0119 - 185.40 m3 0.02046 0.02046
Bekisting m2 638.47 0.3219 - 1,071.23 m2 0.54015 0.54015

1. Bobok Beton m3 54.00 0.0328

100.0000

BOBOT RENCANA MINGGUAN : 0.10408 0.13485 0.08233 0.08233 0.01766 0.01766 0.01766 0.01766 0.80689 0.80689 0.80689 BOBOT S/D MGG 11 KONTRAK 90.33051 88.62395 0.77159 0.62677 0.62677 0.62677 0.55768 0.55768 0.46038 0.61368 0.61641 0.61641 0.64756 0.64756 0.77945 0.77945 0.87343 0.87352 0.87352 1.52479 1.52479 1.52479 1.52479 1.52479 1.52479 BOBOT S/D MGG 100.00000 62.48267 0.47096 0.47096 0.47096 0.47096 0.47096 0.47096 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.47171 0.47489 0.52445 0.52070 0.52070 0.52070 0.52070 0.52070 0.52070 0.52425 0.76081 0.75726 0.75726 0.75726 0.72089 0.72089
2.05980 34 KONTRAK ADD 40.05563
BOBOT KOMULATIF RENCANA MINGGUAN : 0.00000 0.10408 0.23893 0.32127 0.40360 0.42126 0.43892 0.45657 0.47423 1.28112 2.08800 2.89489 2.05980 2.83139 3.45815 4.08492 4.71169 5.26937 5.82705 6.28743 6.90111 7.51752 8.13393 8.78149 9.42904 10.20849 10.98795 11.86138 12.73490 13.60842 15.13320 16.65799 18.18278 19.70756 21.23235 22.75714 1 37.51733 37.98828 38.45924 38.93020 39.40115 39.87211 40.34307 40.81231 41.28155 41.75080 42.22004 42.68929 43.15853 43.62777 44.09702 44.56626 45.03797 45.51286 46.03731 46.55801 47.07871 47.59941 48.12012 48.64082 49.16152 49.68578 50.44659 51.20385 51.96111 52.71837 53.43925 54.16014

BOBOT REALISASI MINGGUAN : 0 0.00000 0.00089 0.00445 0.00289 0.02451 0.08435 0.10977 0.93832 0.19340 0.17848 0.52273 BOBOT S/D MGG 11 ADEDNDUM 14.72893 9.14805 4.14984 0.60500 0.224118367 0.004245882 0.0042460879 0.1142995229 0.2389351383 0.17170 0.0059133922 0.0042502292 0.0962884709 0.1480664149 0.1067039507 0.17744 0.90731 1.31701 1.30047 1.53812 1.00613 2.02172 0.00425 BOBOT S/D MGG 1.23430 2.42714 1.61500 1.61087 1.50734 0.87979 0.00398 0.00398 1.68580 1.14925 0.59724 0.59723 1.63629 1.88968 2.32309 1.86242 0.96559 0.96972 0.09164 0.00976 0.72043 0.74694 0.61818 0.65034 0.61818 0.61973 1.16108 1.23422 0.62065 0.61818 0.61818
2.03259 34 ADEDNDUM 2 37.51733
BOBOT KOMULATIF REALISASI MINGGUAN : 0 0.00000 0.00089 0.00535 0.00824 0.03275 0.11710 0.22687 1.16519 1.35859 1.53707 2.05980 2.03259 16.76152 16.76152 25.90957 30.05941 30.66441 30.88853 30.89277 30.89702 31.01132 31.25025 31.42195 31.42786 31.43211 31.52840 31.67647 31.78317 31.96062 32.86793 34.18494 35.48541 37.02353 38.02966 40.05138 40.05563 37.517327486 38.75163 41.17876 42.79377 44.40464 45.91198 46.79177 46.79574 46.79973 48.48553 49.63478 50.23201 50.82925 52.46554 54.35521 56.67831 58.54073 59.50632 60.47604 60.56768 60.57744 61.29787 62.04481 62.66299 63.31332 63.93150 64.55124 65.71232 66.94653 67.56718 68.18536 68.80352

DEVIASI : -0.10408 -0.23804 -0.31592 -0.39536 -0.38850 -0.32182 -0.22970 0.69096 0.07748 -0.55093 -0.83509 DEVIASI 0.02721 13.93013 22.45141 25.97449 25.95272 25.61916 25.06572 24.60959 24.11021 23.73273 23.28802 22.64638 22.00307 21.31991 20.68852 19.92179 19.22572 19.25951 19.05173 18.82742 18.84075 18.32209 18.81903 17.29849 DEVIASI 2.53830 0.76333 2.71951 3.86357 5.00349 6.03987 6.44871 5.98344 5.51818 6.73473 7.41474 7.54273 7.67072 8.83777 10.25820 12.11205 13.50276 13.99346 14.43873 14.00967 13.49873 13.69846 13.92469 14.02217 14.15180 14.24572 14.10465 14.50847 14.98543 14.84881 14.74610 14.64339

Mengetahui Disetujui Oleh


BALAI TEKNIK PERKERETAAPIAN KONSULTAN SUPERVISI
KELAS II WILAYAH SUMATERA BAGIAN UTARA PT. HARAWANA CONSULTANT
PEJABAT PEMBUAT KOMITMEN ACEH WILAYAH II

Teuku Defri John F Sitompul, ST


Koordinator Pengawas Team Leader
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

WAKTU PELAKSANAAN
MINGGU 66 MINGGU 67 MINGGU 68 MINGGU 69 MINGGU 70 MINGGU 71 MINGGU 72 MINGGU 73 MINGGU 74 MINGGU 75 MINGGU 76 MINGGU 77 MINGGU 78 MINGGU 79 MINGGU 80 MINGGU 81 MINGGU 82 MINGGU 83 MINGGU 84 ADD KONTRAK BOBOT MINGGU 85 MINGGU 86 MINGGU 87 MINGGU 88 MINGGU 89 MINGGU 90 MINGGU 91 MINGGU 92 MINGGU 93 MINGGU 94 MINGGU 95 MINGGU 96 MINGGU 97 MINGGU 98 MINGGU 99 ADD KONTRAK BOBOT MINGGU 100 MINGGU 101 MINGGU 102 MINGGU 103 MINGGU 104 MINGGU 105 MINGGU 106 MINGGU 107 MINGGU 108 MINGGU 109 MINGGU 110 MINGGU 111 MINGGU 112 MINGGU 113 ADD KONTRAK BOBOT MINGGU 114 MINGGU 115 MINGGU 116 MINGGU 117 MINGGU 118 ADD KONTRAK BOBOT MINGGU 119 MINGGU 120 MINGGU 121 MINGGU 122 MINGGU 123 MINGGU 124 MINGGU 125 MINGGU 126 MINGGU 127 MINGGU 128 MINGGU 129 MINGGU 130 MINGGU 131 MINGGU 132 MINGGU 133
REALISASI
REALISASI S.D REALISASI S.D REALISASI S.D
03/12/2018 10/12/2018 17/12/2018 24/12/2018 31/12/2018 07/01/2019 14/01/2019 21/01/2019 28/01/2019 04/02/2019 11/02/2019 18/02/2019 25/02/2019 04/03/2019 11/03/2019 18/03/2019 25/03/2019 01/04/2019 08/04/2019 VOLUME ACTUAL 15/04/2019 22/04/2019 29/04/2019 06/05/2019 13/05/2019 20/05/2019 27/05/2019 03/06/2019 10/06/2019 17/06/2019 24/06/2019 01/07/2019 08/07/2019 15/07/2019 22/07/2019 VOLUME ACTUAL 29/07/2019 05/08/2019 12/08/2019 19/08/2019 26/08/2019 02/09/2019 09/09/2019 16/09/2019 23/09/2019 30/09/2019 07/10/2019 14/10/2019 21/10/2019 28/10/2019 VOLUME ACTUAL 04/11/2019 11/11/2019 18/11/2019 25/11/2019 02/12/2019 S.D MINGGU VOLUME ACTUAL 09/12/2019 16/12/2019 23/12/2019 30/12/2019 06/01/2020 13/01/2020 20/01/2020 27/01/2020 03/02/2020 10/02/2020 17/02/2020 24/02/2020 02/03/2020 09/03/2020 16/03/2020
MINGGU 84 SISA MINGGU 99 SISA MINGGU 113 SISA SISA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d 118 VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
09/12/2018 16/12/2018 23/12/2018 30/12/2018 06/01/2019 13/01/2019 20/01/2019 27/01/2019 03/02/2019 10/02/2019 17/02/2019 24/02/2019 03/03/2019 10/03/2019 17/03/2019 24/03/2019 31/03/2019 07/04/2019 14/04/2019 21/04/2019 28/04/2019 05/05/2019 12/05/2019 19/05/2019 26/05/2019 02/06/2019 09/06/2019 16/06/2019 23/06/2019 30/06/2019 07/07/2019 14/07/2019 21/07/2019 28/07/2019 04/08/2019 11/08/2019 18/08/2019 25/08/2019 01/09/2019 08/09/2019 15/09/2019 22/09/2019 29/09/2019 06/10/2019 13/10/2019 20/10/2019 27/10/2019 03/11/2019 10/11/2019 17/11/2019 24/11/2019 01/12/2019 08/12/2019 15/12/2019 22/12/2019 29/12/2019 05/01/2020 12/01/2020 19/01/2020 26/01/2020 02/02/2020 09/02/2020 16/02/2020 23/02/2020 01/03/2020 08/03/2020 15/03/2020 22/03/2020

0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.25443 90,000.00 m2 0.25443 - - - 0.254 90,000.00 m2 0.254 - 0.269 90,000.00 m2 0.269 0.26863 90,000.00 m2 0.26863 -
0.03212 2.00 set 0.06425 0.03212 0.032 2.00 set 0.064 0.032 0.034 2.00 set 0.068 0.034 0.03392 2.00 set 0.06784 0.03392
-
0.00385 30.00 ttk 0.00385 - 0.004 30.00 ttk 0.004 - 0.004 30.00 ttk 0.004 - 0.00407 30.00 ttk 0.00407 -
0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.05031 445.00 ttk 0.08577 0.03547 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.060 445.00 ttk 0.086 0.026 0.009 0.009 0.009 0.080 445.00 ttk 0.091 0.010 0.010 0.09056 445.00 ttk 0.09056 -
- ttk 0.02120 0.02120 - - 0.0053 0.0053 0.0053 0.0053 0.004 60.00 ttk 0.021 0.018 0.004 58.00 ttk 0.022 0.018 0.009 0.009 0.01119 58.00 ttk 0.02164 0.01045 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055
0.00514 6.00 ttk 0.01542 0.01028 0.00514 0.00514 0.005 6.00 ttk 0.015 0.010 0.005 0.005 0.011 4.00 ttk 0.011 - 0.01085 4.00 ttk 0.01085 -
0.02409 10.00 ttk 0.02409 - 0.024 10.00 ttk 0.024 - 0.025 10.00 ttk 0.025 - 0.02544 10.00 ttk 0.02544 -

0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.03466 24.00 bln 0.04626 0.01160 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.041 24.00 bln 0.046 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.049 24.00 bln 0.049 - 0.04884 24.00 bln 0.04884 -
0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.29921 720.00 oh 0.36638 0.06717 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.353 720.00 oh 0.366 0.014 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.387 720.00 oh 0.387 - 0.38683 720.00 oh 0.38683 -

0.05463 108.00 m2 0.06556 0.01093 0.055 108.00 m2 0.066 0.011 0.058 108.00 m2 0.069 0.012 0.05768 108.00 m2 0.06922 0.01154
0.00370 4.00 m2 0.00370 - 0.004 4.00 m2 0.004 - 0.004 4.00 m2 0.004 - 0.00391 4.00 m2 0.00391 -
0.03212 1.00 set 0.03212 - 0.032 1.00 set 0.032 - 0.034 1.00 set 0.034 - 0.03392 1.00 set 0.03392 -

0.06425 1.00 pkt 0.12850 0.06425 0.064 1.00 pkt 0.128 0.064 0.068 1.00 pkt 0.136 0.068 0.06784 1.00 pkt 0.13567 0.06784
- 3,920.00 m2 0.76212 0.76212 - 3,920.00 m2 0.762 0.762 - 3,920.00 m2 0.805 0.805 0.80467 3,920.00 m2 0.80467 -
0.19132 14.00 ttk 0.19132 - 0.191 14.00 ttk 0.191 - 0.202 14.00 ttk 0.202 - 0.20200 14.00 ttk 0.20200 -

0.26509 71,138.20 m2 0.26509 - 0.265 71,138.20 m2 0.265 - 0.280 71,138.20 m2 0.280 - 0.27989 71,138.20 m2 0.27989 -
0.65899 1,920.00 m2 0.65899 - 0.659 1,920.00 m2 0.659 - 0.696 1,920.00 m2 0.696 - 0.69577 1,920.00 m2 0.69577 -

0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 3.83249 12,500.00 m2 3.83249 - 3.832 12,500.00 m2 3.832 - 4.046 12,500.00 m2 4.046 - 4.04643 12,500.00 m2 4.04643 -

0.52363 37,946.70 m2 0.71191 0.18828 0.03766 0.03766 0.03766 0.03766 0.03766 0.712 37,946.70 m2 0.712 - 0.752 37,946.70 m2 0.752 - 0.75165 37,946.70 m2 0.75165 -
0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 18.89775 154,783.87 m3 20.96365 2.06590 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 18.898 154,783.87 m3 20.964 2.066 0.258 0.258 0.258 0.258 0.258 0.258 0.258 21.164 154,783.87 m3 22.134 0.970 0.323 0.323 0.323 22.03483 154,783.87 m3 22.13390 0.09906 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
- 8,214.25 m3 1.46401 1.46401 0.4880 0.4880 0.4880 0.878 8,214.25 m3 1.464 0.586 0.146 0.146 0.927 7,413.95 m3 1.395 0.468 0.117 0.117 0.117 0.117 0.97449 7,413.95 m3 1.39514 0.42065 0.028 0.028 0.028 0.028 0.028
0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 1.81417 31,751.49 m3 1.85642 0.04225 0.0070 0.0070 0.0070 0.0070 0.0070 0.0070 1.856 31,751.49 m3 1.856 - 1.960 31,751.49 m3 1.960 - 1.96005 31,751.49 m3 1.96005 -
0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.68985 31,751.49 m3 0.70993 0.02008 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.710 31,751.49 m3 0.710 - 0.750 31,751.49 m3 0.750 - 0.74956 31,751.49 m3 0.74956 -

0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 5.61595 3,362.40 m' 7.39092 1.77497 0.8875 0.8875 6.606 3,362.40 m' 7.391 0.785 7.439 3,362.40 m' 7.803 0.365 0.091 0.091 0.091 0.091 7.57142 3,362.40 m' 7.80350 0.23208 0.046 0.046 0.046 0.046 0.046

0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.78240 15,287.04 m3 0.89379 0.11139 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.894 15,287.04 m3 0.894 - 0.944 15,287.04 m3 0.944 - 0.94368 15,287.04 m3 0.94368 -
0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.40428 1,488.54 m3 0.55260 0.14832 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.492 1,488.54 m3 0.553 0.061 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.583 1,488.54 m3 0.583 - 0.58344 1,488.54 m3 0.58344 -
0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.69951 744.27 m2 0.84449 0.14497 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.833 744.27 m2 0.844 0.012 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.892 744.27 m2 0.892 - 0.89163 744.27 m2 0.89163 -
0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 8.79320 9,930.52 m3 12.16727 3.37407 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 10.640 9,930.52 m3 12.167 1.527 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 12.846 9,930.52 m3 12.846 - 12.84648 9,930.52 m3 12.84648 -
0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 13.12466 830,160.18 kg 14.82782 1.70316 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 14.766 830,160.18 kg 14.828 0.062 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 15.656 830,160.18 kg 15.656 - 15.65555 830,160.18 kg 15.65555 -
0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.11943 744.27 m3 0.16325 0.04382 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.161 744.27 m3 0.163 0.002 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.172 744.27 m3 0.172 - 0.17237 744.27 m3 0.17237 -
0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 7.92599 21,675.20 m2 10.92931 3.00332 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.4378 0.1565 0.15651 9.648 21,675.20 m2 10.929 1.281 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 11.539 21,675.20 m2 11.539 - 11.53941 21,675.20 m2 11.53941 -

- 324.00 ton 0.37354 0.37354 0.18677 - 324.00 ton 0.374 0.374 - 324.00 ton 0.394 0.394 0.054 - 324.00 ton 0.39439 0.39439
- 40.00 ttk 0.50863 0.50863 0.25431 - 40.00 ttk 0.509 0.509 - - ttk 0.000 - - ttk - -
- 4,834.00 btg 0.23169 0.23169 0.11585 - 4,834.00 btg 0.232 0.232 - - btg 0.000 - - btg - -
- 4,834.00 btg 0.37084 0.37084 0.18542 - 4,834.00 btg 0.371 0.371 - 4,834.00 btg 0.392 0.392 0.131 0.131 0.131 - 4,834.00 btg 0.39154 0.39154

- 4,785.00 m3 2.16311 2.16311 0.54078 - 4,785.00 m3 2.163 2.163 - - m3 0.000 - - m3 - -


- 2,900.00 m'sp 0.86566 0.86566 - 2,900.00 m'sp 0.866 0.866 - - m'sp 0.000 - - m'sp - -
- 2,900.00 msp 0.49227 0.49227 - 2,900.00 msp 0.492 0.492 - - msp 0.000 - - msp - -
- 2,900.00 msp 0.02609 0.02609 - 2,900.00 msp 0.026 0.026 - - msp 0.000 - - msp - -
- 192.00 titik 0.85118 0.85118 - 192.00 titik 0.851 0.851 - - titik 0.000 - - titik - -

- 30.00 buah 0.03266 0.03266 - 30.00 buah 0.033 0.033 - 30.00 buah 0.034 0.034 - 30.00 buah 0.03449 0.03449
- 1.00 set 0.00175 0.00175 - 1.00 set 0.002 0.002 - 1.00 set 0.002 0.002 - 1.00 set 0.00184 0.00184
4.51110 3,000.00 m' 4.51110 - 4.511 3,000.00 m' 4.511 - 4.763 3,000.00 m' 4.763 - 4.76292 3,000.00 m' 4.76292 -

0.00269 84.49 m3 0.00494 0.00225 0.00225 0.005 84.49 m3 0.005 - 0.005 84.49 m3 0.005 - 0.00522 84.49 m3 0.00522 -
0.00134 10.49 m3 0.00389 0.00256 0.00256 0.004 10.49 m3 0.004 - 0.004 10.49 m3 0.004 - 0.00411 10.49 m3 0.00411 -
0.00204 6.20 m3 0.00704 0.00500 0.00500 0.007 6.20 m3 0.007 - 0.007 6.20 m3 0.007 - 0.00743 6.20 m3 0.00743 -
0.05269 45.66 m3 0.06282 0.01012 0.00506 0.00506 0.063 45.66 m3 0.063 - 0.066 45.66 m3 0.066 - 0.06632 45.66 m3 0.06632 -
0.06301 5,447.89 kg 0.09731 0.03430 0.01715 0.01715 0.097 5,447.89 kg 0.097 - 0.103 5,447.89 kg 0.103 - 0.10274 5,447.89 kg 0.10274 -
0.00039 6.20 m3 0.00136 0.00097 0.00097 0.001 6.20 m3 0.001 - 0.001 6.20 m3 0.001 - 0.00144 6.20 m3 0.00144 -
0.00387 64.35 m3 0.00710 0.00323 0.00323 0.007 64.35 m3 0.007 - 0.007 64.35 m3 0.007 - 0.00750 64.35 m3 0.00750 -
0.08514 237.96 m2 0.11999 0.03484 0.01742 0.01742 0.120 237.96 m2 0.120 - 0.127 237.96 m2 0.127 - 0.12668 237.96 m2 0.12668 -

0.11408 2,413.94 m3 0.14114 0.02705 0.02705 0.141 2,413.94 m3 0.141 - 0.149 2,413.94 m3 0.149 - 0.14901 2,413.94 m3 0.14901 -
0.00585 0.00585 0.04139 138.68 m3 0.05148 0.01010 0.01010 0.051 138.68 m3 0.051 - 0.054 138.68 m3 0.054 - 0.05436 138.68 m3 0.05436 -
0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.06325 69.34 m3 0.07868 0.01543 0.01543 0.079 69.34 m3 0.079 - 0.083 69.34 m3 0.083 - 0.08307 69.34 m3 0.08307 -
0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.94574 856.70 m3 1.17868 0.23294 0.11647 0.11647 1.179 856.70 m3 1.179 - 1.244 856.70 m3 1.244 - 1.24447 856.70 m3 1.24447 -
0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 1.71452 119,199.98 kg 2.12908 0.41456 0.20728 0.20728 2.129 119,199.98 kg 2.129 - 2.248 119,199.98 kg 2.248 - 2.24793 119,199.98 kg 2.24793 -
0.00173 0.00173 0.01223 69.34 m3 0.01521 0.00298 0.00298 0.015 69.34 m3 0.015 - 0.016 69.34 m3 0.016 - 0.01606 69.34 m3 0.01606 -
0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.09393 1,052.25 m3 0.11615 0.02222 0.02222 0.116 1,052.25 m3 0.116 - 0.123 1,052.25 m3 0.123 - 0.12263 1,052.25 m3 0.12263 -
0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 1.38546 3,432.11 m2 1.73058 0.34512 0.17256 0.17256 1.731 3,432.11 m2 1.731 - 1.827 3,432.11 m2 1.827 - 1.82718 3,432.11 m2 1.82718 -

0.00462 0.00462 0.00924 158.08 m3 0.00924 - 0.009 158.08 m3 0.009 - 0.010 158.08 m3 0.010 - 0.00976 158.08 m3 0.00976 -
0.00236 0.00236 0.00473 12.74 m3 0.00473 - 0.005 12.74 m3 0.005 - 0.005 12.74 m3 0.005 - 0.00499 12.74 m3 0.00499 -
0.00361 0.00361 0.00723 6.37 m3 0.00723 - 0.007 6.37 m3 0.007 - 0.008 6.37 m3 0.008 - 0.00763 6.37 m3 0.00763 -
0.05716 0.05716 0.05716 0.05716 0.17471 126.99 m3 0.17471 - 0.175 126.99 m3 0.175 - 0.184 126.99 m3 0.184 - 0.18447 126.99 m3 0.18447 -
0.08844 0.08844 0.08844 0.08844 0.32292 18,079.49 kg 0.32292 - 0.323 18,079.49 kg 0.323 - 0.341 18,079.49 kg 0.341 - 0.34095 18,079.49 kg 0.34095 -
0.00070 0.00070 0.00140 6.37 m3 0.00140 - 0.001 6.37 m3 0.001 - 0.001 6.37 m3 0.001 - 0.00148 6.37 m3 0.00148 -
0.00739 0.00739 0.00739 0.02217 200.85 m3 0.02217 - - 0.022 200.85 m3 0.022 - 0.023 200.85 m3 0.023 - 0.02341 200.85 m3 0.02341 -
0.06215 0.06215 0.06215 0.06215 0.19567 388.05 m2 0.19567 - 0.196 388.05 m2 0.196 - 0.207 388.05 m2 0.207 - 0.20659 388.05 m2 0.20659 -

0.01230 0.01230 - 420.86 m3 0.02461 0.02461 0.02461 - 420.86 m3 0.025 0.025 0.025 0.026 420.86 m3 0.026 - 0.02598 420.86 m3 0.02598 -
0.00751 0.00751 - 40.48 m3 0.01503 0.01503 0.01503 - 40.48 m3 0.015 0.015 0.015 0.016 40.48 m3 0.016 - 0.01587 40.48 m3 0.01587 -
0.01148 0.01148 - 20.24 m3 0.02297 0.02297 0.02297 - 20.24 m3 0.023 0.023 0.023 0.024 20.24 m3 0.024 - 0.02425 20.24 m3 0.02425 -
0.11915 0.11915 0.11915 0.11915 - 323.26 m3 0.44476 0.44476 0.22238 0.22238 - 323.26 m3 0.445 0.445 0.111 0.111 0.111 0.111 0.470 323.26 m3 0.470 - 0.46958 323.26 m3 0.46958 -
0.17298 0.17298 0.17298 0.17298 - 37,808.67 kg 0.67532 0.67532 0.49283 0.18249 - 37,808.67 kg 0.675 0.675 0.169 0.169 0.169 0.169 0.713 37,808.67 kg 0.713 - 0.71301 37,808.67 kg 0.71301 -
0.00222 0.00222 - 20.24 m3 0.00444 0.00444 0.00444 - 20.24 m3 0.004 0.004 0.004 0.005 20.24 m3 0.005 - 0.00469 20.24 m3 0.00469 -
0.01251 0.01251 0.01251 - 339.90 m3 0.03752 0.03752 0.03752 - 339.90 m3 0.038 0.038 0.038 0.040 339.90 m3 0.040 - 0.03961 339.90 m3 0.03961 -
0.12679 0.12679 0.12679 0.12679 - 812.61 m2 0.40975 0.40975 0.20487 0.20487 - 812.61 m2 0.410 0.410 0.137 0.137 0.137 0.433 812.61 m2 0.433 - 0.43262 812.61 m2 0.43262 -

0.00404 0.00404 - 367.08 m3 0.02146 0.02146 0.02146 0.021 367.08 m3 0.021 - 0.023 367.08 m3 0.023 - 0.02266 367.08 m3 0.02266 -
0.00633 0.00633 - 19.88 m3 0.00738 0.00738 0.00738 0.007 19.88 m3 0.007 - 0.008 19.88 m3 0.008 - 0.00779 19.88 m3 0.00779 -
0.00967 0.00967 - 9.94 m3 0.01128 0.01128 0.01128 0.011 9.94 m3 0.011 - 0.012 9.94 m3 0.012 - 0.01191 9.94 m3 0.01191 -
0.12117 0.12117 0.12117 0.12117 - 205.10 m3 0.28219 0.28219 0.09406 0.09406 0.09406 0.282 205.10 m3 0.282 - 0.298 205.10 m3 0.298 - 0.29794 205.10 m3 0.29794 -
0.10683 0.10683 0.10683 0.10683 - 26,062.73 kg 0.46552 0.46552 0.15517 0.23611 0.07423 0.466 26,062.73 kg 0.466 - 0.492 26,062.73 kg 0.492 - 0.49150 26,062.73 kg 0.49150 -
0.00187 0.00187 - 9.94 m3 0.00218 0.00218 0.00218 0.002 9.94 m3 0.002 - 0.002 9.94 m3 0.002 - 0.00230 9.94 m3 0.00230 -
0.00682 0.00682 0.00682 - 108.15 m3 0.01194 0.01194 0.01194 0.012 108.15 m3 0.012 - 0.013 108.15 m3 0.013 - 0.01260 108.15 m3 0.01260 -
0.13504 0.13504 0.13504 0.13504 - 638.47 m2 0.32194 0.32194 0.16097 0.16097 0.322 638.47 m2 0.322 - 0.340 638.47 m2 0.340 - 0.33991 638.47 m2 0.33991 -

- 54.00 m3 0.03279 0.03279 0.03279 - 54.00 m3 0.033 0.033 0.016 0.016 0.035 54.00 m3 0.035 - 0.03462 54.00 m3 0.03462 -

0.72089 0.72857 1.29466 1.28697 1.29075 1.29075 1.10503 1.52803 1.50089 1.96666 1.96666 1.55998 1.93242 1.92018 1.91734 1.91734 1.55430 1.54748 1.54748 BOBOT S/D MGG 100.00000 24.97181 0.74118 0.74118 0.99581 0.99581 0.99581 1.59809 1.59000 0.00415 0.00415 1.37870 1.38336 2.77279 1.89635 2.17409 2.18006 BOBOT S/D MGG 100.000 14.909 0.216 0.216 0.211 0.211 0.211 0.211 0.228 0.494 0.545 0.895 0.886 0.886 0.933 0.616 BOBOT S/D MGG 100.000 3.57014 0.53125 0.53125 0.68090 0.34754 0.18406 BOBOT S/D 100.000 1.69779 0.05137 0.05137 0.05137 0.05137 0.05137 0.00495 0.00495 0.00550 0.00550 0.00550 0.03355 0.03355 0.03355 0.03355 0.03355
84 KONTRAK ADD 75.02819 99 KONTRAK ADD 85.09150 113 KONTRAK 91.23928 MGG 118 98.20211
54.88103 55.60960 56.90426 58.19123 59.48198 60.77273 61.87776 63.40579 64.90668 66.87334 68.84000 70.39997 72.33239 74.25257 76.16990 78.08724 79.64154 81.18903 82.73651 3 75.02819 75.76937 76.51055 77.50636 78.50218 79.49799 81.09608 82.68608 82.69022 82.69437 84.07307 85.45643 88.22921 90.12556 92.29965 94.47971 3 85.091 85.30783 85.524 85.735 85.947 86.158 86.369 86.597 87.091 87.636 88.531 89.417 90.303 91.236 91.852 ADD 5 96.42986 96.96112 97.49237 98.17327 98.52081 98.70487 KONTRAK 98.30221 98.35358 98.40495 98.45632 98.50769 98.55905 98.56401 98.56896 98.57446 98.57997 98.58547 98.61902 98.65256 98.68611 98.71966 98.75320
ADD 5
0.00647 0.00666 0.03382 0.00553 0.00554 0.00398 0.00398 0.00399 0.00399 0.00398 0.45119 1.65972 1.23218 1.56409 1.22361 0.00398 0.00399 0.00398 0.00398 BOBOT S/D MGG 0.41207 0.00400 0.00400 0.00398 0.00398 0.09723 0.00397 0.00397 0.00398 0.00398 0.14161 0.59304 0.60112 2.99945 5.1870 BOBOT S/D MGG 0.07994 0.02935 0.34105 0.10545 0.47819 1.38760 0.3290499963 1.19140 0.74016 1.29369 0.05269 0.03752 0.07449 0.00720 BOBOT S/D MGG 0.40787 0.47513 0.53053 0.36233 0.09648 BOBOT S/D 0.22048 0.15976 0.17116 0.05062 0.12554 0.06852 0.06035 0.06520 0.0000 0.00485 0.08164 0.00000 0.00000 0.00000 0.00000
84 ADEDNDUM 3 75.02819 99 ADEDNDUM 3 85.09150 113 ADEDNDUM 6 96.42986 MGG 118 98.30221
68.81000 68.81666 68.85048 68.85600 68.86155 68.86553 68.86950 68.87349 68.87749 68.88147 69.33266 70.99237 72.22455 73.78864 75.01225 75.01624 75.02023 75.02421 75.02819 75.0282 75.44026 75.44426 75.44825 75.45224 75.45621 75.55343 75.55740 75.56136 75.56534 75.56932 75.71093 76.30397 76.90509 79.90454 85.09150 85.091 85.17144 85.20079 85.54184 85.64729 86.12548 87.51309 87.84214 89.03354 89.77369 91.06739 91.12007 91.15759 91.23208 91.23928 96.430 96.73764 97.21277 97.74330 98.10563 98.20211 ADEDNDUM 7 100.00000 98.52269 98.68245 98.85361 98.90423 99.02978 99.09830 99.15865 99.22385 99.22385 99.22870 99.31034 99.31034 99.31034 99.31034 99.31034

13.92897 13.20706 11.94622 10.66477 9.37956 8.09279 6.99174 5.46770 3.97081 2.00813 0.49266 0.59240 (0.10784) (0.46393) (1.15766) (3.07100) (4.62131) (6.16482) (7.70832) DEVIASI (0.00000) (0.32911) (1.06629) (2.05811) (3.04994) (4.04179) (5.54265) (7.12868) (7.12887) (7.12903) (8.50375) (9.74550) (11.92524) (13.22048) (12.39511) (9.38821) DEVIASI - -0.13639 -0.32338 -0.19353 -0.29928 -0.03229 1.14412 1.24557 1.94253 2.13760 2.53665 1.70330 0.85478 -0.00410 -0.61274 DEVIASI (5.19059) -0.15675 -0.24623 -0.42997 -0.41518 -0.50276 DEVIASI (0.10010) 0.16911 0.27750 0.39729 0.39655 0.47072 0.53429 0.58968 0.64938 0.64388 0.64323 0.69133 0.65778 0.62423 0.59069 0.55714

Aceh Tamiang, 28 Juni 2020


Dibuat dan Dihitung Oleh
KONTRAKTOR PELAKSANA
PT. DWIFARITA FAJARKHARISMA

Basuki Setyawan, ST
Site Manager
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

KET
MINGGU 134 MINGGU 135 MINGGU 136 MINGGU 137 MINGGU 138 MINGGU 139 MINGGU 140 MINGGU 141 MINGGU 142 MINGGU 143 MINGGU 144 MINGGU 145 MINGGU 146 MINGGU 147 MINGGU 148 MINGGU 149 MINGGU 150 MINGGU 151 MINGGU 152
23/03/2020 30/03/2020 06/04/2020 13/04/2020 20/04/2020 27/04/2020 04/05/2020 11/05/2020 18/05/2020 25/05/2020 01/06/2020 08/06/2020 15/06/2020 22/06/2020 29/06/2020 06/07/2020 13/07/2020 20/07/2020 27/07/2020
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
29/03/2020 05/04/2020 12/04/2020 19/04/2020 26/04/2020 03/05/2020 10/05/2020 17/05/2020 24/05/2020 31/05/2020 07/06/2020 14/06/2020 21/06/2020 28/06/2020 05/07/2020 12/07/2020 19/07/2020 26/07/2020 31/07/2020

0.008 0.008 0.008 0.008

0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055

0.006 0.006

0.034 0.034

0.005 0.005 0.005 0.005 0.005


0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028

0.131 0.131 0.131

0.131 0.131 0.131

0.034
0.002

0.03355 0.03355 0.03355 0.03355 0.03355 0.02859 0.02859 0.02859 0.02859 0.02859 0.00055 0.00000 0.13051 0.26198 0.26198 0.13994 0.04481 0.04817 0.04817

98.78675 98.82030 98.85384 98.88739 98.92094 98.94953 98.97812 99.00672 99.03531 99.06390 99.06445 99.06445 99.19496 99.45694 99.71891 99.85886 99.90367 99.95183 100.00000

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034

0.52359 0.49005 0.45650 0.42295 0.38941 0.36081 0.33222 0.30363 0.27503 0.24644 0.24589 0.24589 0.11538 -0.14660 -0.40857 -0.54852 -0.59333
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA
Jl. Kenanga Raya No. 37B Medan Selayang 20132
Sumatera Utara

LAPORAN MINGGUAN

PEKERJAAN
PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG
KM. 441 + 000 s.d KM. 444 + 000

PAKET : BSL - 10

MINGGU KE : 153 ( SERATUS LIMA PULUH TIGA )

TANGGAL : 03 Agustus 2020


s.d
09 Agustus 2020

NOMOR KONTRAK : 10/SP/ SP- BSL/BTP-SBU/IX/2017


TANGGAL : 04 September 2017
NOMOR KONTRAK ADD1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 November 2017
NOMOR KONTRAK ADD2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMOR KONTRAK ADD3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMOR KONTRAK ADD4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMOR KONTRAK ADD5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMOR KONTRAK ADD6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMOR KONTRAK ADD7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMOR KONTRAK ADD8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMOR KONTRAK ADD9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020

KONTRAKTOR PELAKSANA : PT. DWIFARITA FAJARKHARISMA


Jl. Raya Pasar Minggu KM.17 No.22 D Lt II Jakarta

KONSULTAN SUPERVISI : PT. HARAWANA CONSULTANT


Jl. Purwosari/Hiligeo I No.99 Medan

PT.DWIFARITA FAJARKHARISMA
Jl. Raya Pasar Minggu KM.17 No.22 D Lt II Jakarta

PT.HARAWANA CONSULTANT
Architect ,Planner,Curveying,Soil Investigation,Supervisi,F.Study Kantor Pusat : JL. Hiligeo I No.99
Telp. (061) 6634094 Fax. (061) 6632128 Medan
BALAI TEKNIK PERKERETAAPIAN WILAYAH SUMATERA BAGIAN UTARA REKAPITULASI
LAPORAN FISIK KEMAJUAN PEKERJAAN FISIK MINGGUAN

PEKERJAAN : PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG


KM.441 + 000 s.d KM. 444 + 000 MINGGU KE :
PAKET : BSL - 10 153 ( SERATUS LIMA PULUH TIGA )
KEMENTRIAN / INSTANSI : KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA TANGGAL :
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA 03 Agustus 2020
KONTRAK NO. : 10/SP/ SP- BSL/BTP-SBU/IX/2017 s/d
TANGGAL : 04 September 2017 09 Agustus 2020
KONTRAK ADD1 NO. : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD 2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD 3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD 4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD 5 : 10/ADD5/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 07 Agustusi 2019
NOMER KONTRAK ADD 6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD 7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMER KONTRAK ADD 8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMER KONTRAK ADD 9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JADWAL WAKTU : 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN : PT. HARAWANA CONSULTANT

REALISASI REALISASI SISA FISIK


BOBOT KONTRAK REALISASI
NO URAIAN PEKERJAAN ADD 6 % S/D MINGGU INI S/D S/D
MINGGU LALU MINGGU INI MINGGU INI

A. UMUM

1.1 DESAIN, SURVEI, DAN PERIJINAN 0.48903 0.45138 0.00000 0.45138 0.03765

1.2. MANAJEMEN LAPANGAN 0.54272 0.53118 0.00000 0.53118 0.01154

1.3. MOBILISASI DAN DEMOBILISASI 1.14234 1.07451 0.00000 1.07451 0.06784

JUMLAH BOBOT A = 2.17409 2.05707 0.00000 2.05707 0.11702

B. JALUR DAN BANGUNAN

2.1. SIPIL 82.46811 82.13290 0.00000 82.13290 0.33521

2.2 JALAN REL 0.78593 0.39154 0.00000 0.39154 0.39439

2.3. PENDUKUNG JALUR DAN BANGUNAN 4.79925 4.76292 0.00000 4.76292 0.03633

2.4 JEMBATAN 9.77262 9.77262 0.00000 9.77262 0.00000

JUMLAH BOBOT B = 97.82591 97.05997 0.00000 97.05997 0.76593

JUMLAH BOBOT A + B = 100.000 99.11704 0.00000 99.11704 0.88296

BOBOT RENCANA KOMULATIF : 98.90841 %


BOBOT REALISASI KOMULATIF : 99.11704 %
DEVIASI : 0.20863 %

Aceh Tamiang, 09 Agustus 2020


: MENGETAHUI : DISETUJUI OLEH : DIBUAT OLEH
DIVISI TEKNIK KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
BALAI PERKERETAAPIAN
KELAS II WILAYAH SUMATERA BAGIAN UTARA PT. HARAWANA CONSULTANT PT. DWIFARITA FAJARKHARISMA
PEJABAT PEMBUAT KOMITMEN ACEH WILAYAH II
SEKRETARIS PROYEK

Konsultan Supervisi
PT. WANAYASATAMA TRACKINDO
Muhammad Nazar John F Sitompul, ST Samsul Hidayat, ST
Sekretaris Proyek Team Leader Project Manager
Konsultan Supervisi
PT. WANAYASATAMA TRACKINDO
Muhammad Nazar John F Sitompul, ST Samsul Hidayat, ST
Sekretaris Proyek Team Leader Project Manager

MAS YANTO HERLIANTO


Koordinator Lapangan
\

\ BALAI TEKNIK PERKERETAAPIAN WILAYAH SUMATERA BAGIAN UTARA


LAPORAN MINGGUAN
LAPORAN FISIK KEMAJUAN PEKERJAAN
]
PEKERJAAN : PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG
PAKET : BSL - 10
KM.441 + 000 s.d KM. 444 + 000
PAKET : BSL - 10 RENCANA MINGGU KE :
KEMENTERIAN / : KEMENTERIAN PERHUBUNGAN 153 ( SERATUS LIMA PULUH TIGA )
INSTANSI DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA TANGGAL
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA 03 Agustus 2020
NOMER KONTRAK : 10/SP/ SP- BSL/BTP-SBU/IX/2017 s.d
TANGGAL 04 September 2017 09 Agustus 2020
NOMER KONTRAK ADD 1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD 2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD 3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD 4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD 5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD 6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD 7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
JANGKA WAKTU 1062 Hari Kalender ( 04 September 2017 s.d 31 Juli 2020 )
KONSULTAN : PT. HARAWANA CONSULTANT

Uraian Sub Output / Komponen REALISASI SISA YANG BELUM


NO SATUAN VOLUME BOBOT % S/D MINGGU LALU MINGGU INI S/D MINGGU INI DIKERJAKAN
Sub Komponen Detail VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13
A. UMUM
1.1 DESAIN, SURVEI, DAN PERIJINAN
1.1.1. DESAIN, SURVEI, DAN PERIJINAN
1. Pengukuran topography m2 90,000.00 0.26863 90,000.00 0.26863 - - 90,000.00 0.26863 - -
2. Pembuatan shop drawing dan asbuilt drawing set 2.00 0.06784 1.00 0.03392 - - 1.000 0.03392 1.000 0.03392
3. Penyelidikan tanah -
a. DCP titik 30.00 0.00407 30.00 0.00407 - - 30.00 0.00407 - -
b. Sand Cone titik 445.00 0.09056 445.00 0.09056 - - 445.00 0.09056 - -
c. Plat Bearing titik 58.00 0.02164 48.00 0.01791 - - 48.00 0.01791 10.00 0.00373
d. Penyelidikan sampel quarry titik 4.00 0.01085 4.00 0.01085 - - 4.00 0.01085 - -
e. Sondering test titik 10.00 0.02544 10.00 0.02544 - - 10.00 0.02544 - -
Jumlah A 1.1 = 0.48903 0.45138 - 0.45138 0.03765
1.2. MANAJEMEN LAPANGAN
1.2.1. ADMINISTRASI LAPANGAN
1. Dokumentasi bln 24.00 0.04884 24.00 0.04884 - - 24.00 0.04884 - -
2 Jaga malam,peralatan kerja dan mesin - mesin oh 720.00 0.38683 720.00 0.38683 - - 720.00 0.38683 - -
1.2.2. OPERASIONAL KANTOR LAPANGAN
1. Membuat dan membongkar direksi keet, los kerja, dan gudang m2 108.00 0.06922 90.00 0.05768 - - 90.00 0.05768 18.00 0.01154
2. Papan nama pekerjaan m2 4.00 0.00391 4.00 0.00391 - - 4.00 0.00391 - -
3. Operasional direksikeet set 1.00 0.03392 1.00 0.03392 - - 1.00 0.03392 - -
Jumlah A 1.2 = 0.54272 0.53118 - 0.53118 0.01154
1.3. MOBILISASI DAN DEMOBILISASI
1.3.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
1. Mobilisasi dan demobilisasi Peralatan Berat paket 1.00 0.13567 0.50 0.06784 - - 0.500 0.06784 0.500 0.06784
2. Perbaikan jalan akses masyarakat m2 3,920.00 0.80467 3,920.00 0.80467 - - 3,920.00 0.80467 - -
3. Relokasi tiang PLN ttk 14.00 0.20200 14.00 0.20200 - - 14.00 0.20200 - -
Jumlah A 1.3 = 1.14234 1.07451 - 1.07451 0.06784
Jumlah A = 2.17409 2.05707 - 2.05707 0.11702
B JALUR DAN BANGUNAN
2.1. SIPIL
2.1.1 Pekerjaan Persiapan
1. Pembersihan lapangan dan perataan m2 71,138.20 0.27989 71,138.20 0.27989 - - 71,138.20 0.27989 - -
2 Pembongkaran bangunan m2 1,920.00 0.69577 1,920.00 0.69577 - - 1,920.00 0.69577 - -
2.1.2. PERBAIKAN TANAH DASAR -
1. Perkuatan dengan geotekstile m2 12,500.00 4.04643 12,500.00 4.04643 - - 12,500.00 4.04643 - -
-
2.1.3. KONSTRUKSI TUBUH BAAN -
1. Stripping / pengupasan lapisan tanah dasar mak 50cm m2 37,946.70 0.75165 37,946.70 0.75165 - - 37,946.70 0.75165 - -
2. Timbunan dengan material tanah pilihan m3 154,783.87 22.13390 154,513.11 22.09518 - - 154,513.11 22.09518 270.76 0.03872
3. Timbunan dengan sirtu (sub balas) m3 7,413.95 1.39514 6,865.55 1.29194 - - 6,865.55 1.29194 548.40 0.10320
4. Galian tanah dengan alat berat m3 31,751.49 1.96005 31,751.49 1.96005 - - 31,751.49 1.96005 - -
5. Membuang Tanah sejauh 30 m m3 31,751.49 0.74956 31,751.49 0.74956 - - 31,751.49 0.74956 - -
-
2.1.4. DRAINASE -
1. Drainase beton pracetak 80x80 cm tebal 10 cm m' 3,362.40 7.80350 3,362.40 7.80350 - - 3,362.40 7.80350 - -
-
2. Retaining wall -
Galian Tanah m3 15,287.04 0.94368 15,287.04 0.94368 - - 15,287.04 0.94368 - -
Pasangan batu kosong m3 1,488.54 0.58344 1,488.54 0.58344 - - 1,488.54 0.58344 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 744.27 0.89163 744.27 0.89163 - - 744.27 0.89163 - -
Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 m3 9,930.52 12.84648 9,930.52 12.84648 - - 9,930.52 12.84648 - -
Pembesian dengan besi ulir kg 830,160.18 15.65555 830,160.18 15.65555 - - 830,160.18 15.65555 - -
Urugan pasir m3 744.27 0.17237 744.27 0.17237 - - 744.27 0.17237 - -
Bekisting m2 21,675.20 11.53941 21,675.20 11.53941 - - 21,675.20 11.53941 - -
Jumlah B 2.1 82.44845 82.30653 - 82.30653 0.14192
2.2 JALAN REL
2.2.1. MATERIAL JALAN KA
1. Angkutan rel ton 324.00 0.39439 - - - - - - 324.00 0.39439
4 Angkutan Bantalan Beton Lengkap Dengan Alat Penambat Elastis /btg btg 4,834.00 0.39154 4,834.00 0.39154 - - 4,834.00 0.39154 - -

Jumlah B 2.2 = 0.78593 0.39154 - 0.39154 0.39439


Uraian Sub Output / Komponen REALISASI SISA YANG BELUM
NO SATUAN VOLUME BOBOT % S/D MINGGU LALU MINGGU INI S/D MINGGU INI DIKERJAKAN
Sub Komponen Detail VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13
2.3. PENDUKUNG JALUR DAN BANGUNAN
2.3.1. PAPAN INFORMASI KONSTRUKSI
1. Patok KM-HM buah 30.00 0.03449 - - - - - - 30.00 0.03449
2. Tanda-tanda lintas set 1.00 0.00184 - - - - - - 1.00 0.00184
3. Pemasangan pagar sterilisasi panel beton t=120 cm m' 3,000.00 4.76292 3,000.00 4.76292 - - 3,000.00 4.76292 - -
Jumlah B 2.3 = 4.79925 4.76292 - 4.76292 0.03633
2.4 JEMBATAN
1. Underpass akses masyarakat uk. 6x5,5 (2 unit)
2. Box Culvert uk. 4x4 (1 unit)
3. Jembatan Perlintasan Jalan Nasional
1. 'PEKERJAAN PONDASI
Pondasi Abutmen A1
Pondasi Abutmen A2
2. PEKERJAAN ABUTMEN
Pekerjaan Abutmen A1
Pekerjaan Abutmen A2
3. PEKERJAAN DECK
4. I GIRDER
5. BEARING
6. EXPANSION JOINT

B JALUR DAN BANGUNAN

Box Culvert uk. 1x1 (2 unit)


Galian Tanah m3 84.49 0.00522 84.49 0.00522 - - 84.49 0.00522 - -
Pasangan batu kosong m3 10.49 0.00411 10.49 0.00411 - - 10.49 0.00411 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.20 0.00743 6.20 0.00743 - - 6.20 0.00743 - -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 45.66 0.06632 45.66 0.06632 - - 45.66 0.06632 - -
Pembesian dengan besi ulir kg 5,447.89 0.10274 5,447.89 0.10274 - - 5,447.89 0.10274 - -
Urugan pasir m3 6.20 0.00144 6.20 0.00144 - - 6.20 0.00144 - -
Structural Backfill m3 64.35 0.00750 64.35 0.00750 - - 64.35 0.00750 - -
Bekisting m2 237.96 0.12668 237.96 0.12668 - - 237.96 0.12668 - -

Box Culvert Uk. 2x2 (12 unit)


Galian Tanah m3 2,413.94 0.14901 2,413.94 0.14901 - - 2,413.94 0.14901 - -
Pasangan batu kosong m3 138.68 0.05436 138.68 0.05436 - - 138.68 0.05436 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 69.34 0.08307 69.34 0.08307 - - 69.34 0.08307 - -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 856.70 1.24447 856.70 1.24447 - - 856.70 1.24447 - -
Pembesian dengan besi ulir kg 119,199.98 2.24793 119,199.98 2.24793 - - 119,199.98 2.24793 - -
Urugan pasir m3 69.34 0.01606 69.34 0.01606 - - 69.34 0.01606 - -
Structural Backfill m3 1,052.25 0.12263 1,052.25 0.12263 - - 1,052.25 0.12263 - -
Bekisting m2 3,432.11 1.82718 3,432.11 1.82718 - - 3,432.11 1.82718 - -

Underpass Warga 4x4 (1 unit)


Galian Tanah m3 158.08 0.00976 158.08 0.00976 - - 158.08 0.00976 - -
Pasangan batu kosong m3 12.74 0.00499 12.74 0.00499 - - 12.74 0.00499 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.37 0.00763 6.37 0.00763 - - 6.37 0.00763 - -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 126.99 0.18447 126.99 0.18447 - - 126.99 0.18447 - -
Pembesian dengan besi ulir kg 18,079.49 0.34095 18,079.49 0.34095 - - 18,079.49 0.34095 - -
Urugan pasir m3 6.37 0.00148 6.37 0.00148 - - 6.37 0.00148 - -
Structural Backfill m3 200.85 0.02341 200.85 0.02341 - - 200.85 0.02341 - -
Bekisting m2 388.05 0.20659 388.05 0.20659 - - 388.05 0.20659 - -

Box Culvert Uk. 4x4x2 (1 unit)


Galian Tanah m3 420.86 0.02598 420.86 0.02598 - - 420.86 0.02598 - -
Pasangan batu kosong m3 40.48 0.01587 40.48 0.01587 - - 40.48 0.01587 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 20.24 0.02425 20.24 0.02425 - - 20.24 0.02425 - -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 323.26 0.46958 323.26 0.46958 - - 323.26 0.46958 - -
Pembesian dengan besi ulir kg 37,808.67 0.71301 37,808.67 0.71301 - - 37,808.67 0.71301 - -
Urugan pasir m3 20.24 0.00469 20.24 0.00469 - - 20.24 0.00469 - -
Structural Backfill m3 339.90 0.03961 339.90 0.03961 - - 339.90 0.03961 - -
Bekisting m2 812.61 0.43262 812.61 0.43262 - - 812.61 0.43262 - -

Box Culvert Uk. 6x4x2 (1 unit)


Galian Tanah m3 367.08 0.02266 367.08 0.02266 - - 367.08 0.02266 - -
Pasangan batu kosong m3 19.88 0.00779 19.88 0.00779 - - 19.88 0.00779 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 9.94 0.01191 9.94 0.01191 - - 9.94 0.01191 - -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 205.10 0.29794 205.10 0.29794 - - 205.10 0.29794 - -
Pembesian dengan besi ulir kg 26,062.73 0.49150 26,062.73 0.49150 - - 26,062.73 0.49150 - -
Urugan pasir m3 9.94 0.00230 9.94 0.00230 - - 9.94 0.00230 - -
Structural Backfill m3 108.15 0.01260 108.15 0.01260 - - 108.15 0.01260 - -
Bekisting m2 638.47 0.33991 638.47 0.33991 - - 638.47 0.33991 - -

1. Bobok Beton m3 54.00 0.03462 54.00 0.03462 - - 54.00 0.03462 - -

Jumlah B 2.4 = 9.79229 9.79229 - 9.79229 -


Jumlah B = 97.82591 97.25327 - 97.25327 0.57264
Jumlah A + B = 100.000 99.31034 - 99.31034 0.68966

Bobot Rencana Komulatif = 99.90367 %


Bobot Realisasi Komulatif = 99.31034 %
Deviasi = -0.59333 %

Aceh Tamiang, 09 Agustus 2020


: MENGETAHUI : DISETUJUI OLEH : DIBUAT OLEH
BALAI TEKNIK PERKERETAAPIAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
KELAS II WILAYAH SUMATERA BAGIAN UTARA
PEJABAT PWMBUAT KOMITMEN ACEH WILAYAH II PT. HARAWANA CONSULTANT PT. DWIFARITA FAJARKHARISMA
KOORDINATOR PENGAWAS

Teuku Defri John F Sitompul, ST Basuki Setyawan, ST


Koordinator Pengawas Team Leader Site Manager
VOLUME MINGGU
SATUAN BOBOT (%) SKALA MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 11 ADD KONTRAK BOBOT MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20 MINGGU 21 MINGGU 22 MINGGU 23 MINGGU 24 MINGGU 25 MINGGU 26 MINGGU 27
Uraian Sub Output / Sub Output 10
Komponen Sub Komponen Detail 04/09/2017 11/09/2017 18/09/2017 25/09/2017 02/10/2017 09/10/2017 16/10/2017 23/10/2017 30/10/2017 06/11/2017 13/11/2017 REALISASI S.D MINGGU 11 VOLUME ACTUAL SISA 20/11/2017 27/11/2017 04/12/2017 11/12/2017 18/12/2017 25/12/2017 01/01/2018 08/01/2018 15/01/2018 22/01/2018 29/01/2018 05/02/2018 12/02/2018 19/02/2018 26/02/2018 05/03/2018
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
10/09/2017 17/09/2017 24/09/2017 01/10/2017 08/10/2017 15/10/2017 22/10/2017 29/10/2017 05/11/2017 12/11/2017 19/11/2017 26/11/2017 03/12/2017 10/12/2017 17/12/2017 24/12/2017 31/12/2017 07/01/2018 14/01/2018 21/01/2018 28/01/2018 04/02/2018 11/02/2018 18/02/2018 25/02/2018 04/03/2018 11/03/2018

UMUM

1.1. DESAIN, SURVEI, DAN PERIJINAN


100
1.1.1. DESAIN, SURVEI, DAN PERIJINAN
1 Pengukuran topography m2 90,000.00 0.25443 0.0688 0.0688 0.0688 0.0688 0.07464 90,000.00 m2 0.2544 0.1798 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195
2 Pembuatan shop drawing dan asbuilt drawing set 2.00 0.06425 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.00869 2.00 set 0.0642 0.0556

3 Penyelidikan tanah
a. DCP ttk 30.00 0.00385 0.00008 0.00008 0.00008 0.00412 30.00 ttk 0.0039 - 0.0003 - 0.00009 - 0.00009 - 0.00009
b. Sand Cone ttk 445.00 0.08577 0.00164 0.00164 0.00164 - 445.00 ttk 0.0858 0.0858 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179
c. Plat Bearing ttk 60.00 0.02120 0.00045 0.00045 0.00045 - 60.00 ttk 0.0212 0.0212
d. Penyelidikan sampel quarry ttk 6.00 0.01542 0.0042 0.0042 0.0042 0.0042 0.00556 6.00 ttk 0.0154 0.0099 0.00164 0.00164 0.00164 0.00164 0.00164 0.00164
e. Soundering test ttk 10.00 0.02409 ttk
1.2. MANAJEMEN LAPANGAN
1.2.1. ADMINISTRASI LAPANGAN
1 Dokumentasi bln 24.00 0.04626 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00491 24.00 bln 0.0463 0.0414 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045
2 Jaga malam,peralatan kerja dan mesin - mesin oh 720.00 0.36638 - 720.00 oh 0.3664 0.3664 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398
1.2.2. OPERASIONAL KANTOR LAPANGAN
1 Membuat dan membongkar direksi keet, los kerja, dan guda m2 108.00 0.06556 0.0177 0.0177 0.05914 108.00 m2 0.0656 0.0064
2 Papan nama pekerjaan m2 4.00 0.00370 0.0040 0.00401 4.00 m2 0.0037 - 0.00031 - 0.00031
3 Operasional direksikeet set 1.00 0.03212 0.0348 0.02608 1.00 set 0.0321 0.0060

1.3. MOBILISASI DAN DEMOBILISASI


1.3.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
1 Mobilisasi dan demobilisasi Peralatan Berat pkt 1.00 0.12850 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.06954 1.00 pkt 0.1285 0.0590
2 Perbaikan jalan akses masyarakat m2 3,920.00 0.76212 - 3,920.00 m2 0.7621 0.7621
3. Relokasi tiang PLN ttk 14.00 0.19132 14.00 ttk 0.1913 0.1913 0.0957 0.0957
JALUR DAN BANGUNAN
2.1. SIPIL

2.1.1 Pekerjaan Persiapan


1 Pembersihan lapangan dan perataan m2 71,138.20 0.26509 0.0465 0.0465 0.0465 0.28694 71,138.20 m2 0.2651 - 0.0218 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273
2 Pembongkaran bangunan m2 1,920.00 0.65899 1,920.00 m2 0.6590 0.6590 0.16475 0.16475 0.16475 0.16475
2.1.2. PERBAIKAN TANAH DASAR
1 Perkuatan dengan geotekstile m2 12,500.00 3.83249 0.1106 0.1106 0.1106 - 12,500.00 m2 3.8325 3.8325 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533

2.1.2. KONSTRUKSI TUBUH BAAN


1 Stripping / pengupasan lapisan tanah dasar mak 50cm m2 37,946.70 0.71191 0.0197 0.0197 0.0197 0.56679 37,946.70 m2 0.7119 0.1451 0.1451
2 Timbunan dengan material tanah pilihan m3 154,783.87 20.96365 0.30599 0.30599 0.30599 0.51310 154,783.87 m3 20.9637 20.4506 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328
70
3 Timbunan dengan sirtu (sub balas) m3 8,214.25 1.46401 - 8,214.25 m3 1.4640 1.4640 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311
4 Galian tanah dengan alat berat m3 31,751.49 1.85642 0.2325 0.2325 0.2325 0.07229 31,751.49 m3 1.8564 1.7841 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446
5 Membuang Tanah sejauh 30 m m3 31,751.49 0.70993 0.0889 0.0889 0.0889 0.01075 31,751.49 m3 0.7099 0.6992 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171

2.1.2. DRAINASE
1 Drainase beton pracetak 80x80 cm tebal 10 cm m' 3,362.40 7.39092 - 3,362.40 m' 7.3909 7.3909 0.1320 0.1320 0.1320 0.1320

2 Retaining wall
Galian Tanah m3 15,287.04 0.89379 - 15,287.04 m3 0.8938 0.8938
Pasangan batu kosong m3 1,488.54 0.55260 - 1,488.54 m3 0.5526 0.5526
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m2 744.27 0.84449 - 744.27 m2 0.8445 0.8445
Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 m3 9,930.52 12.16727 - 9,930.52 m3 12.1673 12.1673
Pembesian dengan besi ulir m3 830,160.18 14.82782 - 830,160.18 m3 14.8278 14.8278
Urugan pasir m3 744.27 0.16325 - 744.27 m3 0.1633 0.1633
Bekisting m2 21,675.20 10.92931 - 21,675.20 m2 10.9293 10.9293

2.2 JALAN REL


2.2.1. MATERIAL JALAN KA
1 Angkutan rel ton 324.00 0.37354 - 324.00 ton 0.3735 0.3735
2 Bantalan Kayu untuk MJ lengkap dengan aksesoris ttk 40.00 0.50863 - 40.00 ttk 0.5086 0.5086

3 Ecer Bantalan Beton Beserta alat penambat btg 4,834.00 0.23169 - 4,834.00 btg 0.2317 0.2317
4 Angkutan Bantalan Beton Lengkap Dengan Alat Penambat Elastis /btg btg 4,834.00 0.37084

2.2.2. KONSTRUKSI JALAN KA


1 Pengadaan dan pengeceran balas m3 4,785.00 2.1631 - 4,785.00 m3 2.1631 2.1631

2 Pemasangan track R.54 dengan pemecokan awal m'sp 2,900.00 0.8657 - 2,900.00 m'sp 0.8657 0.8657
3 MTT msp 2,900.00 0.4923 - 2,900.00 msp 0.4923 0.4923
4 PBR msp 2,900.00 0.0261 - 2,900.00 msp 0.0261 0.0261
5 Pengelasan flash butt R.54 titik 192.00 0.8512 - 192.00 titik 0.8512 0.8512

2.3. PENDUKUNG JALUR DAN BANGUNAN


50
2.3.1. PAPAN INFORMASI KONSTRUKSI
1 Patok KM-HM buah 30.00 0.0327 - 30.00 buah 0.0327 0.0327
2 Tanda-tanda lintas set 1.00 0.0017 - 1.00 set 0.0017 0.0017
50
3 Pemasangan pagar sterilisasi panel beton t=120 cm m' 3,000.00 4.5111 - 3,000.00 m' 4.5111 4.5111 0.09398 0.09398

2.7. JEMBATAN

1 Underpass akses masyarakat uk. 6x5,5 (2 unit)


2 Box Culvert uk. 4x4 (1 unit)
3 Jembatan Perlintasan Jalan Nasional
1. 'PEKERJAAN PONDASI
2. PEKERJAAN ABUTMEN
3. 'PEKERJAAN DECK
4. 'I GIRDER
5. 'BEARING
6. 'EXPANSION JOINT

Box Culvert uk. 1x1 (2 unit)


Galian Tanah m3 84.49 0.0049
Pasangan batu kosong m3 10.49 0.0039
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.20 0.0070
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 45.66 0.0628
Pembesian dengan besi ulir kg 5,447.89 0.0973
Urugan pasir m3 6.20 0.0014
Structural Backfill m3 64.35 0.0071
Bekisting m2 237.96 0.1200

Box Culvert Uk. 2x2 (12 unit)


Galian Tanah m3 2,413.94 0.1411
Pasangan batu kosong m3 138.68 0.0515
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 69.34 0.0787
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 856.70 1.1787
Pembesian dengan besi ulir kg 119,199.98 2.1291
Urugan pasir m3 69.34 0.0152
Structural Backfill m3 1,052.25 0.1161
Bekisting m2 3,432.11 1.7306

Underpass Warga 4x4 (1 unit)


Galian Tanah m3 158.08 0.0092
Pasangan batu kosong m3 12.74 0.0047
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.37 0.0072
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 126.99 0.1747
Pembesian dengan besi ulir kg 18,079.49 0.3229
Urugan pasir m3 6.37 0.0014
Structural Backfill m3 200.85 0.0222
Bekisting m2 388.05 0.1957

Box Culvert Uk. 4x4x2 (1 unit)


Galian Tanah m3 420.86 0.0246
Pasangan batu kosong m3 40.48 0.0150
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 20.24 0.0230
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 323.26 0.4448
Pembesian dengan besi ulir kg 37,808.67 0.6753
Urugan pasir m3 20.24 0.0044
Structural Backfill m3 339.90 0.0375
Bekisting m2 812.61 0.4097

Box Culvert Uk. 6x4x2 (1 unit)


Galian Tanah m3 367.08 0.0215
Pasangan batu kosong m3 19.88 0.0074
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 9.94 0.0113
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 205.10 0.2822
Pembesian dengan besi ulir kg 26,062.73 0.4655
Urugan pasir m3 9.94 0.0022
Structural Backfill m3 108.15 0.0119
Bekisting m2 638.47 0.3219

1. Bobok Beton m3 54.00 0.0328

100.0000

BOBOT RENCANA MINGGUAN : 0.10408 0.13485 0.08233 0.08233 0.01766 0.01766 0.01766 0.01766 0.80689 0.80689 0.80689 BOBOT S/D MGG 11 KONTRAK 90.33 88.62395 0.77159 0.62677 0.62677 0.62677 0.55768 0.55768 0.46038 0.61368 0.61641 0.61641 0.64756 0.64756 0.77945 0.77945 0.87343 0.87352
2.05980
BOBOT KOMULATIF RENCANA MINGGUAN : 0 0.10408 0.23893 0.32127 0.40360 0.42126 0.43892 0.45657 0.47423 1.28112 2.08800 2.89489 2.05980 2.83139 3.45815 4.08492 4.71169 5.26937 5.82705 6.28743 6.90111 7.51752 8.13393 8.78149 9.42904 10.20849 10.98795 11.86138 12.73490

BOBOT REALISASI MINGGUAN : 0 0.00000 0.00089 0.00445 0.00289 0.02451 0.08435 0.10977 0.93832 0.19340 0.17848 0.52273 BOBOT S/D MGG 11 ADEDNDUM 14.72893 9.14805 4.14984 0.60500 0.224118367 0.004245882 0.0042460879 0.1142995229 0.2389351383 0.17170 0.0059133922 0.0042502292 0.0962884709 0.1480664149 0.1067039507 0.17744
2.03259
BOBOT KOMULATIF REALISASI MINGGUAN : 0 0.00000 0.00089 0.00535 0.00824 0.03275 0.11710 0.22687 1.16519 1.35859 1.53707 2.05980 2.03259 16.76152 16.76152 25.90957 30.05941 30.66441 30.88853 30.89277 30.89702 31.01132 31.25025 31.42195 31.42786 31.43211 31.52840 31.67647 31.78317 31.96062

DEVIASI : -0.10408 -0.23804 -0.31592 -0.39536 -0.38850 -0.32182 -0.22970 0.69096 0.07748 -0.55093 -0.83509 DEVIASI 0.02721 13.93013 22.45141 25.97449 25.95272 25.61916 25.06572 24.60959 24.11021 23.73273 23.28802 22.64638 22.00307 21.31991 20.68852 19.92179 19.22572

Mengetahui
BALAI TEKNIK PERKERETAAPIAN
KELAS II WILAYAH SUMATERA BAGIAN UTARA
PPK ACEH WILAYAH II

Hendri Utama
Pengawas Paket
KURVA S
Pembangunan Jalan KA Antara Langsa - Besitang KM 441+000 s.d 444+000
BSL -10
WAKTU PELAKSANAAN
MINGGU 28 MINGGU 29 MINGGU 30 MINGGU 31 MINGGU 32 MINGGU 33 MINGGU 34 ADD KONTRAK BOBOT MINGGU 35 MINGGU 36 MINGGU 37 MINGGU 38 MINGGU 39 MINGGU 40 MINGGU 41 MINGGU 42 MINGGU 43 MINGGU 44 MINGGU 45 MINGGU 46 MINGGU 47 MINGGU 48 MINGGU 49 MINGGU 50 MINGGU 51 MINGGU 52 MINGGU 53 MINGGU 54 MINGGU 55 MINGGU 56 MINGGU 57 MINGGU 58 MINGGU 59 MINGGU 60 MINGGU 61 MINGGU 62 MINGGU 63 MINGGU 64 MINGGU 65
REALISASI S.D
12/03/2018 19/03/2018 26/03/2018 02/04/2018 09/04/2018 16/04/2018 23/04/2018 VOLUME ACTUAL 30/04/2018 07/05/2018 14/05/2018 21/05/2018 28/05/2018 04/06/2018 11/06/2018 18/06/2018 25/06/2018 02/07/2018 09/07/2018 16/07/2018 23/07/2018 30/07/2018 06/08/2018 13/08/2018 20/08/2018 27/08/2018 03/09/2018 10/09/2018 17/09/2018 24/09/2018 01/10/2018 08/10/2018 15/10/2018 22/10/2018 29/10/2018 05/11/2018 12/11/2018 19/11/2018 26/11/2018
MINGGU 34 SISA
s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
18/03/2018 25/03/2018 01/04/2018 08/04/2018 15/04/2018 22/04/2018 29/04/2018 06/05/2018 13/05/2018 20/05/2018 27/05/2018 03/06/2018 10/06/2018 17/06/2018 24/06/2018 01/07/2018 08/07/2018 15/07/2018 22/07/2018 29/07/2018 05/08/2018 12/08/2018 19/08/2018 26/08/2018 02/09/2018 09/09/2018 16/09/2018 23/09/2018 30/09/2018 07/10/2018 14/10/2018 21/10/2018 28/10/2018 04/11/2018 11/11/2018 18/11/2018 25/11/2018 02/12/2018

0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.19787 90,000.00 m2 0.25443 0.05656 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082
0.03212 2.00 set 0.06425 0.03212

0.00385 30.00 ttk 0.00385 -


0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.02679 400.00 ttk 0.07710 0.05031
- 60.00 ttk 0.02120 0.02120
0.00514 6.00 ttk 0.01542 0.01028 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171
0.02409 10.00 ttk 0.02409 - -

0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.01371 24.00 bln 0.04626 0.03255 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047
0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.12111 720.00 oh 0.36638 0.24527 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355

0.05463 108.00 m2 0.06556 0.01093


0.00370 4.00 m2 0.00370 -
0.03212 1.00 set 0.03212 -

0.0642 1.00 pkt 0.12850 0.06425


- 3,600.00 m2 0.69991 0.69991
0.1913 14.00 ttk 0.19132 -

0.26509 71138.2008 m2 0.26509 -


0.65899 1920.00 m2 0.65899 -

0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 2.91269 12,500.00 m2 3.83249 0.91980

0.52363 27,910.93 m2 0.52363 -


0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 13.58909 155,308.556 m3 21.03472 7.44562
0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 - 8,214.25 m3 1.46401 1.46401
0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.92255 36,035.35 m3 2.10688 1.18434
0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.34888 36,035.35 m3 0.80571 0.45683

0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 - 3,351.00 m' 7.36586 7.36586 - -

0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.27922 15,004.76 m3 0.87729 0.59807 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120
0.0089 0.0089 0.0089 0.0089 0.0089 0.0089 0.31404 1,436.76 m3 0.53337 0.21933 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044
0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.43022 718.38 m2 0.81511 0.38488 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069
0.1962 0.1962 0.1962 0.1962 0.1962 0.1962 3.15151 9,520.03 m3 11.66433 8.51281 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520
0.2392 0.2392 0.2392 0.2392 0.2392 0.2392 6.32121 809,155.34 kg 14.45265 8.13144 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452
0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.08317 718.38 m3 0.15758 0.07441 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
0.1763 0.1763 0.1763 0.1763 0.1763 0.1763 2.43521 20,652.24 m2 10.41350 7.97829 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425

- 324.00 ton 0.37354 0.37354


- 40.00 ttk 0.50863 0.50863
- 4834.00 btg 0.23169 0.23169

- 4785.00 m3 2.16311 2.16311


- 2900.00 m'sp 0.86566 0.86566
- 2900.00 msp 0.49227 0.49227
- 2900.00 msp 0.02609 0.02609
- 192.00 titik 0.85118 0.85118

- 30.00 buah 0.03266 0.03266


- 1.00 set 0.00175 0.00175
0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 4.51110 3,000.00 m' 4.51110 -

- 84.49 m3 0.00494 0.00494 0.00247 0.00247


- 6.60 m3 0.00245 0.00245 0.00245
- 3.30 m3 0.00374 0.00374 0.00374
- 80.48 m3 0.11073 0.11073 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384
- 7,034.97 kg 0.12565 0.12565 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571
- 3.30 m3 0.00072 0.00072 0.00072
- 64.35 m3 0.00710 0.00710 0.00355 0.00355
- 347.64 m2 0.17529 0.17529 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191

- 2,488.42 m3 0.14549 0.14549 0.03637 0.03637 0.03637 0.03637


- 126.10 m3 0.04681 0.04681 0.00585 0.00585 0.00585 0.00585 0.00585 0.00585
- 63.05 m3 0.07154 0.07154 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511
- 1,148.23 m3 1.57978 1.57978 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319
- 124,190.18 kg 2.21821 2.21821 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873
- 63.05 m3 0.01383 0.01383 0.00173 0.00173 0.00173 0.00173 0.00173 0.00173
- 1,109.44 m3 0.12246 0.12246
- 4,315.16 m2 2.17584 2.17584 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703

- 158.08 m3 0.00924 0.00924


- 12.74 m3 0.00473 0.00473
- 6.37 m3 0.00723 0.00723
- 166.19 m3 0.22865 0.22865
- 19,806.47 kg 0.35377 0.35377
- 6.37 m3 0.00140 0.00140
- 200.85 m3 0.02217 0.02217
- 493.07 m2 0.24862 0.24862

- 420.86 m3 0.02461 0.02461


- 40.48 m3 0.01503 0.01503
- 20.24 m3 0.02297 0.02297
- 346.40 m3 0.47660 0.47660
- 38,738.53 kg 0.69192 0.69192
- 20.24 m3 0.00444 0.00444
- 339.90 m3 0.03752 0.03752
- 1,005.77 m2 0.50714 0.50714

- 138.15 m3 0.00808 0.00808


- 34.08 m3 0.01265 0.01265
- 17.04 m3 0.01933 0.01933
- 352.28 m3 0.48468 0.48468
- 23,923.23 kg 0.42730 0.42730
- 17.04 m3 0.00374 0.00374
- 185.40 m3 0.02046 0.02046
- 1,071.23 m2 0.54015 0.54015

0.87352 1.52479 1.52479 1.52479 1.52479 1.52479 1.52479 BOBOT S/D MGG 100.00 62.48267 0.47096 0.47096 0.47096 0.47096 0.47096 0.47096 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.47171 0.47489 0.52445 0.52070 0.52070 0.52070 0.52070 0.52070 0.52070 0.52425 0.76081 0.75726 0.75726 0.75726 0.72089 0.72089
34 KONTRAK ADD 40.05563
13.60842 15.13320 16.65799 18.18278 19.70756 21.23235 22.75714 1 37.51733 37.98828 38.45924 38.93020 39.40115 39.87211 40.34307 40.81231 41.28155 41.75080 42.22004 42.68929 43.15853 43.62777 44.09702 44.56626 45.03797 45.51286 46.03731 46.55801 47.07871 47.59941 48.12012 48.64082 49.16152 49.68578 50.44659 51.20385 51.96111 52.71837 53.43925 54.16014

0.90731 1.31701 1.30047 1.53812 1.00613 2.02172 0.00425 BOBOT S/D MGG 1.23430 2.42714 1.61500 1.61087 1.50734 0.87979 0.00398 0.00398 1.68580 1.14925 0.59724 0.59723 1.63629 1.88968 2.32309 1.86242 0.96559 0.96972 0.09164 0.00976 0.72043 0.74694 0.61818 0.65034 0.61818 0.61973 1.16108 1.23422 0.62065 0.61818 0.61818
34 ADEDNDUM 2 37.51733
32.86793 34.18494 35.48541 37.02353 38.02966 40.05138 40.05563 37.517327486 38.75163 41.17876 42.79377 44.40464 45.91198 46.79177 46.79574 46.79973 48.48553 49.63478 50.23201 50.82925 52.46554 54.35521 56.67831 58.54073 59.50632 60.47604 60.56768 60.57744 61.29787 62.04481 62.66299 63.31332 63.93150 64.55124 65.71232 66.94653 67.56718 68.18536 68.80352

19.25951 19.05173 18.82742 18.84075 18.32209 18.81903 17.29849 DEVIASI 2.53830 0.76333 2.71951 3.86357 5.00349 6.03987 6.44871 5.98344 5.51818 6.73473 7.41474 7.54273 7.67072 8.83777 10.25820 12.11205 13.50276 13.99346 14.43873 14.00967 13.49873 13.69846 13.92469 14.02217 14.15180 14.24572 14.10465 14.50847 14.98543 14.84881 14.74610 14.64339

Disetujui Oleh
KONSULTAN SUPERVISI
PT. HARAWANA CONSULTANT

Roldes Sitorus, ST
Pengawas
KURVA S
KA Antara Langsa - Besitang KM 441+000 s.d 444+000
BSL -10
WAKTU PELAKSANAAN
MINGGU 66
03/12/2018
s.d
09/12/2018

0.00082

0.00047
0.00355

0.0120
0.0044
0.0069
0.1520
0.1452
0.0015
0.1425

0.00585
0.00511
0.06319
0.08873
0.00173

0.08703

0.72089

54.88103

0.00647

68.81000

13.92897
KET
MINGGU 67 MINGGU 68 MINGGU 69 MINGGU 70 MINGGU 71 MINGGU 72 MINGGU 73 MINGGU 74 MINGGU 75 MINGGU 76 MINGGU 77 MINGGU 78 MINGGU 79 MINGGU 80 MINGGU 81 MINGGU 82 MINGGU 83 MINGGU 84 ADD KONTRAK BOBOT MINGGU 85 MINGGU 86 MINGGU 87 MINGGU 88 MINGGU 89 MINGGU 90 MINGGU 91 MINGGU 92 MINGGU 93 MINGGU 94 MINGGU 95 MINGGU 96 MINGGU 97 MINGGU 98 MINGGU 99 MINGGU 100 MINGGU 101 MINGGU 102 MINGGU 103
REALISASI S.D
10/12/2018 17/12/2018 24/12/2018 31/12/2018 07/01/2019 14/01/2019 21/01/2019 28/01/2019 04/02/2019 11/02/2019 18/02/2019 25/02/2019 04/03/2019 11/03/2019 18/03/2019 25/03/2019 01/04/2019 08/04/2019 VOLUME ACTUAL 15/04/2019 22/04/2019 29/04/2019 06/05/2019 13/05/2019 20/05/2019 27/05/2019 03/06/2019 10/06/2019 17/06/2019 24/06/2019 01/07/2019 08/07/2019 15/07/2019 22/07/2019 29/07/2019 05/08/2019 12/08/2019 19/08/2019
MINGGU 84 SISA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
16/12/2018 23/12/2018 30/12/2018 06/01/2019 13/01/2019 20/01/2019 27/01/2019 03/02/2019 10/02/2019 17/02/2019 24/02/2019 03/03/2019 10/03/2019 17/03/2019 24/03/2019 31/03/2019 07/04/2019 14/04/2019 21/04/2019 28/04/2019 05/05/2019 12/05/2019 19/05/2019 26/05/2019 02/06/2019 09/06/2019 16/06/2019 23/06/2019 30/06/2019 07/07/2019 14/07/2019 21/07/2019 28/07/2019 04/08/2019 11/08/2019 18/08/2019 24/08/2019

0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.25443 90,000.00 m2 0.25443 - - -
0.03212 2.00 set 0.06425 0.03212 0.0107 0.0107 0.0107
-
0.00385 30.00 ttk 0.00385 -
0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.05031 445.00 ttk 0.08577 0.03547 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030
- ttk 0.02120 0.02120 - - 0.0053 0.0053 0.0053 0.0053
0.00514 6.00 ttk 0.01542 0.01028 0.00514 0.00514
0.02409 10.00 ttk 0.02409 -

0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.03466 24.00 bln 0.04626 0.01160 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061
0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.29921 720.00 oh 0.36638 0.06717 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354

0.05463 108.00 m2 0.06556 0.01093 0.0055 0.0055


0.00370 4.00 m2 0.00370 -
0.03212 1.00 set 0.03212 -

0.06425 1.00 pkt 0.12850 0.06425 0.0214 0.0214 0.0214


- 3,920.00 m2 0.76212 0.76212 0.2540 0.2540 0.2540
0.19132 14.00 ttk 0.19132 -

0.26509 71,138.20 m2 0.26509 -


0.65899 1,920.00 m2 0.65899 -

0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 3.83249 12,500.00 m2 3.83249 -

0.52363 37,946.70 m2 0.71191 0.18828 0.03766 0.03766 0.03766 0.03766 0.03766


0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 18.89775 154,783.87 m3 20.96365 2.06590 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066
- 8,214.25 m3 1.46401 1.46401 0.4880 0.4880 0.4880
0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 1.81417 31,751.49 m3 1.85642 0.04225 0.0070 0.0070 0.0070 0.0070 0.0070 0.0070
0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.68985 31,751.49 m3 0.70993 0.02008 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033

0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 5.61595 3,362.40 m' 7.39092 1.77497 0.8875 0.8875

0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.78240 15,287.04 m3 0.89379 0.11139 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159
0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.40428 1,488.54 m3 0.55260 0.14832 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212
0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.69951 744.27 m2 0.84449 0.14497 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181
0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 8.79320 9,930.52 m3 12.16727 3.37407 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812
0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 13.12466 830,160.18 kg 14.82782 1.70316 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419
0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.11943 744.27 m3 0.16325 0.04382 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055
0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 7.92599 21,675.20 m2 10.92931 3.00332 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503

- 324.00 ton 0.37354 0.37354 0.18677 0.18677


- 40.00 ttk 0.50863 0.50863 0.25431 0.25431
- 4,834.00 btg 0.23169 0.23169 0.11585 0.11585
- 4,834.00 btg 0.37084 0.37084 0.18542 0.18542

- 4,785.00 m3 2.16311 2.16311 0.54078 0.54078 0.54078 0.54078


- 2,900.00 m'sp 0.86566 0.86566 0.43283 0.43283
- 2,900.00 msp 0.49227 0.49227 0.24613 0.24613
- 2,900.00 msp 0.02609 0.02609 0.01304 0.01304
- 192.00 titik 0.85118 0.85118 0.42559 0.42559

- 30.00 buah 0.03266 0.03266 0.03266


- 1.00 set 0.00175 0.00175 0.00175
4.51110 3,000.00 m' 4.51110 -

0.00269 84.49 m3 0.00494 0.00225 0.00225


0.00134 10.49 m3 0.00389 0.00256 0.00256
0.00204 6.20 m3 0.00704 0.00500 0.00500
0.05269 45.66 m3 0.06282 0.01012 0.00506 0.00506
0.06301 5,447.89 kg 0.09731 0.03430 0.01715 0.01715
0.00039 6.20 m3 0.00136 0.00097 0.00097
0.00387 64.35 m3 0.00710 0.00323 0.00323
0.08514 237.96 m2 0.11999 0.03484 0.01742 0.01742

0.11408 2,413.94 m3 0.14114 0.02705 0.02705


0.00585 0.04139 138.68 m3 0.05148 0.01010 0.01010
0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.06325 69.34 m3 0.07868 0.01543 0.01543
0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.94574 856.70 m3 1.17868 0.23294 0.11647 0.11647
0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 1.71452 119,199.98 kg 2.12908 0.41456 0.20728 0.20728
0.00173 0.01223 69.34 m3 0.01521 0.00298 0.00298
0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.09393 1,052.25 m3 0.11615 0.02222 0.02222
0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 1.38546 3,432.11 m2 1.73058 0.34512 0.17256 0.17256

0.00462 0.00462 0.00924 158.08 m3 0.00924 -


0.00236 0.00236 0.00473 12.74 m3 0.00473 -
0.00361 0.00361 0.00723 6.37 m3 0.00723 -
0.05716 0.05716 0.05716 0.05716 0.17471 126.99 m3 0.17471 -
0.08844 0.08844 0.08844 0.08844 0.32292 18,079.49 kg 0.32292 -
0.00070 0.00070 0.00140 6.37 m3 0.00140 -
0.00739 0.00739 0.00739 0.02217 200.85 m3 0.02217 - -
0.06215 0.06215 0.06215 0.06215 0.19567 388.05 m2 0.19567 -

0.01230 0.01230 - 420.86 m3 0.02461 0.02461 0.02461


0.00751 0.00751 - 40.48 m3 0.01503 0.01503 0.01503
0.01148 0.01148 - 20.24 m3 0.02297 0.02297 0.02297
0.11915 0.11915 0.11915 0.11915 - 323.26 m3 0.44476 0.44476 0.22238 0.22238
0.17298 0.17298 0.17298 0.17298 - 37,808.67 kg 0.67532 0.67532 0.33766 0.33766
0.00222 0.00222 - 20.24 m3 0.00444 0.00444 0.00444
0.01251 0.01251 0.01251 - 339.90 m3 0.03752 0.03752 0.03752
0.12679 0.12679 0.12679 0.12679 - 812.61 m2 0.40975 0.40975 0.20487 0.20487

0.00404 0.00404 - 367.08 m3 0.02146 0.02146 0.02146


0.00633 0.00633 - 19.88 m3 0.00738 0.00738 0.00738
0.00967 0.00967 - 9.94 m3 0.01128 0.01128 0.01128
0.12117 0.12117 0.12117 0.12117 - 205.10 m3 0.28219 0.28219 0.14110 0.14110
0.10683 0.10683 0.10683 0.10683 - 26,062.73 kg 0.46552 0.46552 0.23276 0.23276
0.00187 0.00187 - 9.94 m3 0.00218 0.00218 0.00218
0.00682 0.00682 0.00682 - 108.15 m3 0.01194 0.01194 0.01194
0.13504 0.13504 0.13504 0.13504 - 638.47 m2 0.32194 0.32194 0.16097 0.16097

- 54.00 m3 0.03279 0.03279 0.03279

0.72857 1.29466 1.28697 1.29075 1.29075 1.10503 1.52803 1.50089 1.96666 1.96666 1.55998 1.93242 1.92018 1.91734 1.91734 1.55430 1.54748 1.54748 BOBOT S/D MGG 100.00 24.97181 0.74118 0.74118 0.99581 0.99581 0.99581 1.59809 1.59000 0.00415 0.00415 0.92620 1.48127 2.78467 2.14528 2.26786 2.18006 2.39182 1.94869 0.88401 0.29578
84 KONTRAK ADD 75.02819
55.60960 56.90426 58.19123 59.48198 60.77273 61.87776 63.40579 64.90668 66.87334 68.84000 70.39997 72.33239 74.25257 76.16990 78.08724 79.64154 81.18903 82.73651 3 75.02819 75.76937 76.51055 77.50636 78.50218 79.49799 81.09608 82.68608 82.69022 82.69437 83.62057 85.10184 87.88650 90.03179 92.29965 94.47971 96.87153 98.82022 99.70422 100.000

0.00666 0.03382 0.00553 0.00554 0.00398 0.00398 0.00399 0.00399 0.00398 0.45119 1.65972 1.23218 1.56409 1.22361 0.00398 0.00399 0.00398 0.00398 BOBOT S/D MGG 0.41207
84 ADEDNDUM 3 75.02819
68.81666 68.85048 68.85600 68.86155 68.86553 68.86950 68.87349 68.87749 68.88147 69.33266 70.99237 72.22455 73.78864 75.01225 75.01624 75.02023 75.02421 75.02819 75.0282 75.44026

13.20706 11.94622 10.66477 9.37956 8.09279 6.99174 5.46770 3.97081 2.00813 0.49266 0.59240 (0.10784) (0.46393) (1.15766) (3.07100) (4.62131) (6.16482) (7.70832) DEVIASI (0.00000) (0.32910)

Aceh Tamiang, 21 Juli 2019


Dibuat dan Dihitung Oleh
KONTRAKTOR PELAKSANA
PT. DWIFARITA FAJARKHARISMA

Basuki Setyawan, ST
Site Manager
VOLUME MINGGU
SATUAN BOBOT (%) SKALA MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 11 ADD KONTRAK BOBOT MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20 MINGGU 21 MINGGU 22 MINGGU 23 MINGGU 24 MINGGU 25 MINGGU 26 MINGGU 27
Uraian Sub Output / Sub Output 10
Komponen Sub Komponen Detail 04/09/2017 11/09/2017 18/09/2017 25/09/2017 02/10/2017 09/10/2017 16/10/2017 23/10/2017 30/10/2017 06/11/2017 13/11/2017 REALISASI S.D MINGGU 11 VOLUME ACTUAL SISA 20/11/2017 27/11/2017 04/12/2017 11/12/2017 18/12/2017 25/12/2017 01/01/2018 08/01/2018 15/01/2018 22/01/2018 29/01/2018 05/02/2018 12/02/2018 19/02/2018 26/02/2018 05/03/2018
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
10/09/2017 17/09/2017 24/09/2017 01/10/2017 08/10/2017 15/10/2017 22/10/2017 29/10/2017 05/11/2017 12/11/2017 19/11/2017 26/11/2017 03/12/2017 10/12/2017 17/12/2017 24/12/2017 31/12/2017 07/01/2018 14/01/2018 21/01/2018 28/01/2018 04/02/2018 11/02/2018 18/02/2018 25/02/2018 04/03/2018 11/03/2018

UMUM

1.1. DESAIN, SURVEI, DAN PERIJINAN


100
1.1.1. DESAIN, SURVEI, DAN PERIJINAN
1 Pengukuran topography m2 90,000.00 0.25443 0.0688 0.0688 0.0688 0.0688 0.07464 90,000.00 m2 0.2544 0.1798 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195
2 Pembuatan shop drawing dan asbuilt drawing set 2.00 0.06425 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.00869 2.00 set 0.0642 0.0556

3 Penyelidikan tanah
a. DCP ttk 30.00 0.00385 0.00008 0.00008 0.00008 0.00412 30.00 ttk 0.0039 - 0.0003 - 0.00009 - 0.00009 - 0.00009
b. Sand Cone ttk 445.00 0.08577 0.00164 0.00164 0.00164 - 445.00 ttk 0.0858 0.0858 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179
c. Plat Bearing ttk 60.00 0.02120 0.00045 0.00045 0.00045 - 60.00 ttk 0.0212 0.0212
d. Penyelidikan sampel quarry ttk 6.00 0.01542 0.0042 0.0042 0.0042 0.0042 0.00556 6.00 ttk 0.0154 0.0099 0.00164 0.00164 0.00164 0.00164 0.00164 0.00164
e. Soundering test ttk 10.00 0.02409 ttk
1.2. MANAJEMEN LAPANGAN
1.2.1. ADMINISTRASI LAPANGAN
1 Dokumentasi bln 24.00 0.04626 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00491 24.00 bln 0.0463 0.0414 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045
2 Jaga malam,peralatan kerja dan mesin - mesin oh 720.00 0.36638 - 720.00 oh 0.3664 0.3664 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398
1.2.2. OPERASIONAL KANTOR LAPANGAN
1 Membuat dan membongkar direksi keet, los kerja, dan guda m2 108.00 0.06556 0.0177 0.0177 0.05914 108.00 m2 0.0656 0.0064
2 Papan nama pekerjaan m2 4.00 0.00370 0.0040 0.00401 4.00 m2 0.0037 - 0.00031 - 0.00031
3 Operasional direksikeet set 1.00 0.03212 0.0348 0.02608 1.00 set 0.0321 0.0060

1.3. MOBILISASI DAN DEMOBILISASI


1.3.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
1 Mobilisasi dan demobilisasi Peralatan Berat pkt 1.00 0.12850 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.06954 1.00 pkt 0.1285 0.0590
2 Perbaikan jalan akses masyarakat m2 3,920.00 0.76212 - 3,920.00 m2 0.7621 0.7621
3. Relokasi tiang PLN ttk 14.00 0.19132 14.00 ttk 0.1913 0.1913 0.0957 0.0957
JALUR DAN BANGUNAN
2.1. SIPIL

2.1.1 Pekerjaan Persiapan


1 Pembersihan lapangan dan perataan m2 71,138.20 0.26509 0.0465 0.0465 0.0465 0.28694 71,138.20 m2 0.2651 - 0.0218 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273
2 Pembongkaran bangunan m2 1,920.00 0.65899 1,920.00 m2 0.6590 0.6590 0.16475 0.16475 0.16475 0.16475
2.1.2. PERBAIKAN TANAH DASAR
1 Perkuatan dengan geotekstile m2 12,500.00 3.83249 0.1106 0.1106 0.1106 - 12,500.00 m2 3.8325 3.8325 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533

2.1.2. KONSTRUKSI TUBUH BAAN


1 Stripping / pengupasan lapisan tanah dasar mak 50cm m2 37,946.70 0.71191 0.0197 0.0197 0.0197 0.56679 37,946.70 m2 0.7119 0.1451 0.1451
2 Timbunan dengan material tanah pilihan m3 154,783.87 20.96365 0.30599 0.30599 0.30599 0.51310 154,783.87 m3 20.9637 20.4506 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328
70
3 Timbunan dengan sirtu (sub balas) m3 8,214.25 1.46401 - 8,214.25 m3 1.4640 1.4640 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311
4 Galian tanah dengan alat berat m3 31,751.49 1.85642 0.2325 0.2325 0.2325 0.07229 31,751.49 m3 1.8564 1.7841 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446
5 Membuang Tanah sejauh 30 m m3 31,751.49 0.70993 0.0889 0.0889 0.0889 0.01075 31,751.49 m3 0.7099 0.6992 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171

2.1.2. DRAINASE
1 Drainase beton pracetak 80x80 cm tebal 10 cm m' 3,362.40 7.39092 - 3,362.40 m' 7.3909 7.3909 0.1320 0.1320 0.1320 0.1320

2 Retaining wall
Galian Tanah m3 15,287.04 0.89379 - 15,287.04 m3 0.8938 0.8938
Pasangan batu kosong m3 1,488.54 0.55260 - 1,488.54 m3 0.5526 0.5526
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m2 744.27 0.84449 - 744.27 m2 0.8445 0.8445
Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 m3 9,930.52 12.16727 - 9,930.52 m3 12.1673 12.1673
Pembesian dengan besi ulir m3 830,160.18 14.82782 - 830,160.18 m3 14.8278 14.8278
Urugan pasir m3 744.27 0.16325 - 744.27 m3 0.1633 0.1633
Bekisting m2 21,675.20 10.92931 - 21,675.20 m2 10.9293 10.9293

2.2 JALAN REL


2.2.1. MATERIAL JALAN KA
1 Angkutan rel ton 324.00 0.37354 - 324.00 ton 0.3735 0.3735
2 Bantalan Kayu untuk MJ lengkap dengan aksesoris ttk 40.00 0.50863 - 40.00 ttk 0.5086 0.5086

3 Ecer Bantalan Beton Beserta alat penambat btg 4,834.00 0.23169 - 4,834.00 btg 0.2317 0.2317
4 Angkutan Bantalan Beton Lengkap Dengan Alat Penambat Elastis /btg btg 4,834.00 0.37084

2.2.2. KONSTRUKSI JALAN KA


1 Pengadaan dan pengeceran balas m3 4,785.00 2.1631 - 4,785.00 m3 2.1631 2.1631

2 Pemasangan track R.54 dengan pemecokan awal m'sp 2,900.00 0.8657 - 2,900.00 m'sp 0.8657 0.8657
3 MTT msp 2,900.00 0.4923 - 2,900.00 msp 0.4923 0.4923
4 PBR msp 2,900.00 0.0261 - 2,900.00 msp 0.0261 0.0261
5 Pengelasan flash butt R.54 titik 192.00 0.8512 - 192.00 titik 0.8512 0.8512

2.3. PENDUKUNG JALUR DAN BANGUNAN


50
2.3.1. PAPAN INFORMASI KONSTRUKSI
1 Patok KM-HM buah 30.00 0.0327 - 30.00 buah 0.0327 0.0327
2 Tanda-tanda lintas set 1.00 0.0017 - 1.00 set 0.0017 0.0017
50
3 Pemasangan pagar sterilisasi panel beton t=120 cm m' 3,000.00 4.5111 - 3,000.00 m' 4.5111 4.5111 0.09398 0.09398

2.7. JEMBATAN

1 Underpass akses masyarakat uk. 6x5,5 (2 unit)


2 Box Culvert uk. 4x4 (1 unit)
3 Jembatan Perlintasan Jalan Nasional
1. 'PEKERJAAN PONDASI
2. PEKERJAAN ABUTMEN
3. 'PEKERJAAN DECK
4. 'I GIRDER
5. 'BEARING
6. 'EXPANSION JOINT

Box Culvert uk. 1x1 (2 unit)


Galian Tanah m3 84.49 0.0049
Pasangan batu kosong m3 10.49 0.0039
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.20 0.0070
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 45.66 0.0628
Pembesian dengan besi ulir kg 5,447.89 0.0973
Urugan pasir m3 6.20 0.0014
Structural Backfill m3 64.35 0.0071
Bekisting m2 237.96 0.1200

Box Culvert Uk. 2x2 (12 unit)


Galian Tanah m3 2,413.94 0.1411
Pasangan batu kosong m3 138.68 0.0515
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 69.34 0.0787
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 856.70 1.1787
Pembesian dengan besi ulir kg 119,199.98 2.1291
Urugan pasir m3 69.34 0.0152
Structural Backfill m3 1,052.25 0.1161
Bekisting m2 3,432.11 1.7306

Underpass Warga 4x4 (1 unit)


Galian Tanah m3 158.08 0.0092
Pasangan batu kosong m3 12.74 0.0047
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.37 0.0072
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 126.99 0.1747
Pembesian dengan besi ulir kg 18,079.49 0.3229
Urugan pasir m3 6.37 0.0014
Structural Backfill m3 200.85 0.0222
Bekisting m2 388.05 0.1957

Box Culvert Uk. 4x4x2 (1 unit)


Galian Tanah m3 420.86 0.0246
Pasangan batu kosong m3 40.48 0.0150
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 20.24 0.0230
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 323.26 0.4448
Pembesian dengan besi ulir kg 37,808.67 0.6753
Urugan pasir m3 20.24 0.0044
Structural Backfill m3 339.90 0.0375
Bekisting m2 812.61 0.4097

Box Culvert Uk. 6x4x2 (1 unit)


Galian Tanah m3 367.08 0.0215
Pasangan batu kosong m3 19.88 0.0074
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 9.94 0.0113
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 205.10 0.2822
Pembesian dengan besi ulir kg 26,062.73 0.4655
Urugan pasir m3 9.94 0.0022
Structural Backfill m3 108.15 0.0119
Bekisting m2 638.47 0.3219

1. Bobok Beton m3 54.00 0.0328

100.0000

BOBOT RENCANA MINGGUAN : 0.10408 0.13485 0.08233 0.08233 0.01766 0.01766 0.01766 0.01766 0.80689 0.80689 0.80689 BOBOT S/D MGG 11 KONTRAK 90.33051 88.62395 0.77159 0.62677 0.62677 0.62677 0.55768 0.55768 0.46038 0.61368 0.61641 0.61641 0.64756 0.64756 0.77945 0.77945 0.87343 0.87352
2.05980
BOBOT KOMULATIF RENCANA MINGGUAN : 0.00000 0.10408 0.23893 0.32127 0.40360 0.42126 0.43892 0.45657 0.47423 1.28112 2.08800 2.89489 2.05980 2.83139 3.45815 4.08492 4.71169 5.26937 5.82705 6.28743 6.90111 7.51752 8.13393 8.78149 9.42904 10.20849 10.98795 11.86138 12.73490

BOBOT REALISASI MINGGUAN : 0 0.00000 0.00089 0.00445 0.00289 0.02451 0.08435 0.10977 0.93832 0.19340 0.17848 0.52273 BOBOT S/D MGG 11 ADEDNDUM 14.72893 9.14805 4.14984 0.60500 0.224118367 0.004245882 0.0042460879 0.1142995229 0.2389351383 0.17170 0.0059133922 0.0042502292 0.0962884709 0.1480664149 0.1067039507 0.17744
2.03259
BOBOT KOMULATIF REALISASI MINGGUAN : 0 0.00000 0.00089 0.00535 0.00824 0.03275 0.11710 0.22687 1.16519 1.35859 1.53707 2.05980 2.03259 16.76152 16.76152 25.90957 30.05941 30.66441 30.88853 30.89277 30.89702 31.01132 31.25025 31.42195 31.42786 31.43211 31.52840 31.67647 31.78317 31.96062

DEVIASI : -0.10408 -0.23804 -0.31592 -0.39536 -0.38850 -0.32182 -0.22970 0.69096 0.07748 -0.55093 -0.83509 DEVIASI 0.02721 13.93013 22.45141 25.97449 25.95272 25.61916 25.06572 24.60959 24.11021 23.73273 23.28802 22.64638 22.00307 21.31991 20.68852 19.92179 19.22572

Mengetahui
BALAI TEKNIK PERKERETAAPIAN
KELAS II WILAYAH SUMATERA BAGIAN UTARA
PPK ACEH WILAYAH II

Hendri Utama
Pengawas Paket
KURVA S
Pembangunan Jalan KA Antara Langsa - Besitang KM 441+000 s.d 444+000
BSL -10
WAKTU PELAKSANAAN
MINGGU 28 MINGGU 29 MINGGU 30 MINGGU 31 MINGGU 32 MINGGU 33 MINGGU 34 ADD KONTRAK BOBOT MINGGU 35 MINGGU 36 MINGGU 37 MINGGU 38 MINGGU 39 MINGGU 40 MINGGU 41 MINGGU 42 MINGGU 43 MINGGU 44 MINGGU 45 MINGGU 46 MINGGU 47 MINGGU 48 MINGGU 49 MINGGU 50 MINGGU 51 MINGGU 52 MINGGU 53 MINGGU 54 MINGGU 55 MINGGU 56 MINGGU 57 MINGGU 58 MINGGU 59 MINGGU 60 MINGGU 61 MINGGU 62 MINGGU 63 MINGGU 64 MINGGU 65
REALISASI S.D
12/03/2018 19/03/2018 26/03/2018 02/04/2018 09/04/2018 16/04/2018 23/04/2018 VOLUME ACTUAL 30/04/2018 07/05/2018 14/05/2018 21/05/2018 28/05/2018 04/06/2018 11/06/2018 18/06/2018 25/06/2018 02/07/2018 09/07/2018 16/07/2018 23/07/2018 30/07/2018 06/08/2018 13/08/2018 20/08/2018 27/08/2018 03/09/2018 10/09/2018 17/09/2018 24/09/2018 01/10/2018 08/10/2018 15/10/2018 22/10/2018 29/10/2018 05/11/2018 12/11/2018 19/11/2018 26/11/2018
MINGGU 34 SISA
s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
18/03/2018 25/03/2018 01/04/2018 08/04/2018 15/04/2018 22/04/2018 29/04/2018 06/05/2018 13/05/2018 20/05/2018 27/05/2018 03/06/2018 10/06/2018 17/06/2018 24/06/2018 01/07/2018 08/07/2018 15/07/2018 22/07/2018 29/07/2018 05/08/2018 12/08/2018 19/08/2018 26/08/2018 02/09/2018 09/09/2018 16/09/2018 23/09/2018 30/09/2018 07/10/2018 14/10/2018 21/10/2018 28/10/2018 04/11/2018 11/11/2018 18/11/2018 25/11/2018 02/12/2018

0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.19787 90,000.00 m2 0.25443 0.05656 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082
0.03212 2.00 set 0.06425 0.03212

0.00385 30.00 ttk 0.00385 -


0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.02679 400.00 ttk 0.07710 0.05031
- 60.00 ttk 0.02120 0.02120
0.00514 6.00 ttk 0.01542 0.01028 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171
0.02409 10.00 ttk 0.02409 - -

0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.01371 24.00 bln 0.04626 0.03255 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047
0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.12111 720.00 oh 0.36638 0.24527 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355

0.05463 108.00 m2 0.06556 0.01093


0.00370 4.00 m2 0.00370 -
0.03212 1.00 set 0.03212 -

0.0642 1.00 pkt 0.12850 0.06425


- 3,600.00 m2 0.69991 0.69991
0.1913 14.00 ttk 0.19132 -

0.26509 71138.2008 m2 0.26509 -


0.65899 1920.00 m2 0.65899 -

0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 2.91269 12,500.00 m2 3.83249 0.91980

0.52363 27,910.93 m2 0.52363 -


0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 13.58909 155,308.556 m3 21.03472 7.44562
0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 - 8,214.25 m3 1.46401 1.46401
0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.92255 36,035.35 m3 2.10688 1.18434
0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.34888 36,035.35 m3 0.80571 0.45683

0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 - 3,351.00 m' 7.36586 7.36586 - -

0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.27922 15,004.76 m3 0.87729 0.59807 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120
0.0089 0.0089 0.0089 0.0089 0.0089 0.0089 0.31404 1,436.76 m3 0.53337 0.21933 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044
0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.43022 718.38 m2 0.81511 0.38488 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069
0.1962 0.1962 0.1962 0.1962 0.1962 0.1962 3.15151 9,520.03 m3 11.66433 8.51281 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520
0.2392 0.2392 0.2392 0.2392 0.2392 0.2392 6.32121 809,155.34 kg 14.45265 8.13144 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452
0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.08317 718.38 m3 0.15758 0.07441 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
0.1763 0.1763 0.1763 0.1763 0.1763 0.1763 2.43521 20,652.24 m2 10.41350 7.97829 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425

- 324.00 ton 0.37354 0.37354


- 40.00 ttk 0.50863 0.50863
- 4834.00 btg 0.23169 0.23169

- 4785.00 m3 2.16311 2.16311


- 2900.00 m'sp 0.86566 0.86566
- 2900.00 msp 0.49227 0.49227
- 2900.00 msp 0.02609 0.02609
- 192.00 titik 0.85118 0.85118

- 30.00 buah 0.03266 0.03266


- 1.00 set 0.00175 0.00175
0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 4.51110 3,000.00 m' 4.51110 -

- 84.49 m3 0.00494 0.00494 0.00247 0.00247


- 6.60 m3 0.00245 0.00245 0.00245
- 3.30 m3 0.00374 0.00374 0.00374
- 80.48 m3 0.11073 0.11073 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384
- 7,034.97 kg 0.12565 0.12565 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571
- 3.30 m3 0.00072 0.00072 0.00072
- 64.35 m3 0.00710 0.00710 0.00355 0.00355
- 347.64 m2 0.17529 0.17529 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191

- 2,488.42 m3 0.14549 0.14549 0.03637 0.03637 0.03637 0.03637


- 126.10 m3 0.04681 0.04681 0.00585 0.00585 0.00585 0.00585 0.00585 0.00585
- 63.05 m3 0.07154 0.07154 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511
- 1,148.23 m3 1.57978 1.57978 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319
- 124,190.18 kg 2.21821 2.21821 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873
- 63.05 m3 0.01383 0.01383 0.00173 0.00173 0.00173 0.00173 0.00173 0.00173
- 1,109.44 m3 0.12246 0.12246
- 4,315.16 m2 2.17584 2.17584 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703

- 158.08 m3 0.00924 0.00924


- 12.74 m3 0.00473 0.00473
- 6.37 m3 0.00723 0.00723
- 166.19 m3 0.22865 0.22865
- 19,806.47 kg 0.35377 0.35377
- 6.37 m3 0.00140 0.00140
- 200.85 m3 0.02217 0.02217
- 493.07 m2 0.24862 0.24862

- 420.86 m3 0.02461 0.02461


- 40.48 m3 0.01503 0.01503
- 20.24 m3 0.02297 0.02297
- 346.40 m3 0.47660 0.47660
- 38,738.53 kg 0.69192 0.69192
- 20.24 m3 0.00444 0.00444
- 339.90 m3 0.03752 0.03752
- 1,005.77 m2 0.50714 0.50714

- 138.15 m3 0.00808 0.00808


- 34.08 m3 0.01265 0.01265
- 17.04 m3 0.01933 0.01933
- 352.28 m3 0.48468 0.48468
- 23,923.23 kg 0.42730 0.42730
- 17.04 m3 0.00374 0.00374
- 185.40 m3 0.02046 0.02046
- 1,071.23 m2 0.54015 0.54015

0.87352 1.52479 1.52479 1.52479 1.52479 1.52479 1.52479 BOBOT S/D MGG 100.00000 62.48267 0.47096 0.47096 0.47096 0.47096 0.47096 0.47096 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.47171 0.47489 0.52445 0.52070 0.52070 0.52070 0.52070 0.52070 0.52070 0.52425 0.76081 0.75726 0.75726 0.75726 0.72089 0.72089
34 KONTRAK ADD 40.05563
13.60842 15.13320 16.65799 18.18278 19.70756 21.23235 22.75714 1 37.51733 37.98828 38.45924 38.93020 39.40115 39.87211 40.34307 40.81231 41.28155 41.75080 42.22004 42.68929 43.15853 43.62777 44.09702 44.56626 45.03797 45.51286 46.03731 46.55801 47.07871 47.59941 48.12012 48.64082 49.16152 49.68578 50.44659 51.20385 51.96111 52.71837 53.43925 54.16014

0.90731 1.31701 1.30047 1.53812 1.00613 2.02172 0.00425 BOBOT S/D MGG 1.23430 2.42714 1.61500 1.61087 1.50734 0.87979 0.00398 0.00398 1.68580 1.14925 0.59724 0.59723 1.63629 1.88968 2.32309 1.86242 0.96559 0.96972 0.09164 0.00976 0.72043 0.74694 0.61818 0.65034 0.61818 0.61973 1.16108 1.23422 0.62065 0.61818 0.61818
34 ADEDNDUM 2 37.51733
32.86793 34.18494 35.48541 37.02353 38.02966 40.05138 40.05563 37.517327486 38.75163 41.17876 42.79377 44.40464 45.91198 46.79177 46.79574 46.79973 48.48553 49.63478 50.23201 50.82925 52.46554 54.35521 56.67831 58.54073 59.50632 60.47604 60.56768 60.57744 61.29787 62.04481 62.66299 63.31332 63.93150 64.55124 65.71232 66.94653 67.56718 68.18536 68.80352

19.25951 19.05173 18.82742 18.84075 18.32209 18.81903 17.29849 DEVIASI 2.53830 0.76333 2.71951 3.86357 5.00349 6.03987 6.44871 5.98344 5.51818 6.73473 7.41474 7.54273 7.67072 8.83777 10.25820 12.11205 13.50276 13.99346 14.43873 14.00967 13.49873 13.69846 13.92469 14.02217 14.15180 14.24572 14.10465 14.50847 14.98543 14.84881 14.74610 14.64339

Disetujui Oleh
KONSULTAN SUPERVISI
PT. HARAWANA CONSULTANT

Roldes Sitorus, ST
Pengawas
KURVA S
KA Antara Langsa - Besitang KM 441+000 s.d 444+000
BSL -10
WAKTU PELAKSANAAN
MINGGU 66
03/12/2018
s.d
09/12/2018

0.00082

0.00047
0.00355

0.0120
0.0044
0.0069
0.1520
0.1452
0.0015
0.1425

0.00585
0.00511
0.06319
0.08873
0.00173

0.08703

0.72089

54.88103

0.00647

68.81000

13.92897
KET
MINGGU 67 MINGGU 68 MINGGU 69 MINGGU 70 MINGGU 71 MINGGU 72 MINGGU 73 MINGGU 74 MINGGU 75 MINGGU 76 MINGGU 77 MINGGU 78 MINGGU 79 MINGGU 80 MINGGU 81 MINGGU 82 MINGGU 83 MINGGU 84 ADD KONTRAK BOBOT MINGGU 85 MINGGU 86 MINGGU 87 MINGGU 88 MINGGU 89 MINGGU 90 MINGGU 91 MINGGU 92 MINGGU 93 MINGGU 94 MINGGU 95 MINGGU 96 MINGGU 97 MINGGU 98 MINGGU 99 MINGGU 100 MINGGU 101 MINGGU 102 MINGGU 103
REALISASI S.D
10/12/2018 17/12/2018 24/12/2018 31/12/2018 07/01/2019 14/01/2019 21/01/2019 28/01/2019 04/02/2019 11/02/2019 18/02/2019 25/02/2019 04/03/2019 11/03/2019 18/03/2019 25/03/2019 01/04/2019 08/04/2019 VOLUME ACTUAL 15/04/2019 22/04/2019 29/04/2019 06/05/2019 13/05/2019 20/05/2019 27/05/2019 03/06/2019 10/06/2019 17/06/2019 24/06/2019 01/07/2019 08/07/2019 15/07/2019 22/07/2019 29/07/2019 05/08/2019 12/08/2019 19/08/2019
MINGGU 84 SISA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
16/12/2018 23/12/2018 30/12/2018 06/01/2019 13/01/2019 20/01/2019 27/01/2019 03/02/2019 10/02/2019 17/02/2019 24/02/2019 03/03/2019 10/03/2019 17/03/2019 24/03/2019 31/03/2019 07/04/2019 14/04/2019 21/04/2019 28/04/2019 05/05/2019 12/05/2019 19/05/2019 26/05/2019 02/06/2019 09/06/2019 16/06/2019 23/06/2019 30/06/2019 07/07/2019 14/07/2019 21/07/2019 28/07/2019 04/08/2019 11/08/2019 18/08/2019 24/08/2019

0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.25443 90,000.00 m2 0.25443 - - -
0.03212 2.00 set 0.06425 0.03212 0.0107 0.0107 0.0107
-
0.00385 30.00 ttk 0.00385 -
0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.05031 445.00 ttk 0.08577 0.03547 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030
- ttk 0.02120 0.02120 - - 0.0053 0.0053 0.0053 0.0053
0.00514 6.00 ttk 0.01542 0.01028 0.00514 0.00514
0.02409 10.00 ttk 0.02409 -

0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.03466 24.00 bln 0.04626 0.01160 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061
0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.29921 720.00 oh 0.36638 0.06717 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354

0.05463 108.00 m2 0.06556 0.01093 0.0055 0.0055


0.00370 4.00 m2 0.00370 -
0.03212 1.00 set 0.03212 -

0.06425 1.00 pkt 0.12850 0.06425 0.0214 0.0214 0.0214


- 3,920.00 m2 0.76212 0.76212 0.2540 0.2540 0.2540
0.19132 14.00 ttk 0.19132 -

0.26509 71,138.20 m2 0.26509 -


0.65899 1,920.00 m2 0.65899 -

0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 3.83249 12,500.00 m2 3.83249 -

0.52363 37,946.70 m2 0.71191 0.18828 0.03766 0.03766 0.03766 0.03766 0.03766


0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 18.89775 154,783.87 m3 20.96365 2.06590 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066
- 8,214.25 m3 1.46401 1.46401 0.4880 0.4880 0.4880
0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 1.81417 31,751.49 m3 1.85642 0.04225 0.0070 0.0070 0.0070 0.0070 0.0070 0.0070
0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.68985 31,751.49 m3 0.70993 0.02008 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033

0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 5.61595 3,362.40 m' 7.39092 1.77497 0.8875 0.8875

0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.78240 15,287.04 m3 0.89379 0.11139 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159
0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.40428 1,488.54 m3 0.55260 0.14832 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212
0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.69951 744.27 m2 0.84449 0.14497 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181
0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 8.79320 9,930.52 m3 12.16727 3.37407 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812
0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 13.12466 830,160.18 kg 14.82782 1.70316 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419
0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.11943 744.27 m3 0.16325 0.04382 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055
0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 7.92599 21,675.20 m2 10.92931 3.00332 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.4378 0.1565 0.15651

- 324.00 ton 0.37354 0.37354 0.18677 0.18677


- 40.00 ttk 0.50863 0.50863 0.25431 0.25431
- 4,834.00 btg 0.23169 0.23169 0.11585 0.11585
- 4,834.00 btg 0.37084 0.37084 0.18542 0.18542

- 4,785.00 m3 2.16311 2.16311 0.54078 0.54078 0.54078 0.54078


- 2,900.00 m'sp 0.86566 0.86566 0.43283 0.43283
- 2,900.00 msp 0.49227 0.49227 0.24613 0.24613
- 2,900.00 msp 0.02609 0.02609 0.01304 0.01304
- 192.00 titik 0.85118 0.85118 0.42559 0.42559

- 30.00 buah 0.03266 0.03266 0.03266


- 1.00 set 0.00175 0.00175 0.00175
4.51110 3,000.00 m' 4.51110 -

0.00269 84.49 m3 0.00494 0.00225 0.00225


0.00134 10.49 m3 0.00389 0.00256 0.00256
0.00204 6.20 m3 0.00704 0.00500 0.00500
0.05269 45.66 m3 0.06282 0.01012 0.00506 0.00506
0.06301 5,447.89 kg 0.09731 0.03430 0.01715 0.01715
0.00039 6.20 m3 0.00136 0.00097 0.00097
0.00387 64.35 m3 0.00710 0.00323 0.00323
0.08514 237.96 m2 0.11999 0.03484 0.01742 0.01742

0.11408 2,413.94 m3 0.14114 0.02705 0.02705


0.00585 0.04139 138.68 m3 0.05148 0.01010 0.01010
0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.06325 69.34 m3 0.07868 0.01543 0.01543
0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.94574 856.70 m3 1.17868 0.23294 0.11647 0.11647
0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 1.71452 119,199.98 kg 2.12908 0.41456 0.20728 0.20728
0.00173 0.01223 69.34 m3 0.01521 0.00298 0.00298
0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.09393 1,052.25 m3 0.11615 0.02222 0.02222
0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 1.38546 3,432.11 m2 1.73058 0.34512 0.17256 0.17256

0.00462 0.00462 0.00924 158.08 m3 0.00924 -


0.00236 0.00236 0.00473 12.74 m3 0.00473 -
0.00361 0.00361 0.00723 6.37 m3 0.00723 -
0.05716 0.05716 0.05716 0.05716 0.17471 126.99 m3 0.17471 -
0.08844 0.08844 0.08844 0.08844 0.32292 18,079.49 kg 0.32292 -
0.00070 0.00070 0.00140 6.37 m3 0.00140 -
0.00739 0.00739 0.00739 0.02217 200.85 m3 0.02217 - -
0.06215 0.06215 0.06215 0.06215 0.19567 388.05 m2 0.19567 -

0.01230 0.01230 - 420.86 m3 0.02461 0.02461 0.02461


0.00751 0.00751 - 40.48 m3 0.01503 0.01503 0.01503
0.01148 0.01148 - 20.24 m3 0.02297 0.02297 0.02297
0.11915 0.11915 0.11915 0.11915 - 323.26 m3 0.44476 0.44476 0.22238 0.22238
0.17298 0.17298 0.17298 0.17298 - 37,808.67 kg 0.67532 0.67532 0.49283 0.18249
0.00222 0.00222 - 20.24 m3 0.00444 0.00444 0.00444
0.01251 0.01251 0.01251 - 339.90 m3 0.03752 0.03752 0.03752
0.12679 0.12679 0.12679 0.12679 - 812.61 m2 0.40975 0.40975 0.20487 0.20487

0.00404 0.00404 - 367.08 m3 0.02146 0.02146 0.02146


0.00633 0.00633 - 19.88 m3 0.00738 0.00738 0.00738
0.00967 0.00967 - 9.94 m3 0.01128 0.01128 0.01128
0.12117 0.12117 0.12117 0.12117 - 205.10 m3 0.28219 0.28219 0.09406 0.09406 0.09406
0.10683 0.10683 0.10683 0.10683 - 26,062.73 kg 0.46552 0.46552 0.15517 0.23611 0.07423
0.00187 0.00187 - 9.94 m3 0.00218 0.00218 0.00218
0.00682 0.00682 0.00682 - 108.15 m3 0.01194 0.01194 0.01194
0.13504 0.13504 0.13504 0.13504 - 638.47 m2 0.32194 0.32194 0.16097 0.16097

- 54.00 m3 0.03279 0.03279 0.03279

0.72857 1.29466 1.28697 1.29075 1.29075 1.10503 1.52803 1.50089 1.96666 1.96666 1.55998 1.93242 1.92018 1.91734 1.91734 1.55430 1.54748 1.54748 BOBOT S/D MGG 100.00000 24.97181 0.74118 0.74118 0.99581 0.99581 0.99581 1.59809 1.59000 0.00415 0.00415 1.37870 1.38336 2.77279 1.89635 2.17409 2.18006 2.39182 1.94869 0.88401 0.29578
84 KONTRAK ADD 75.02819
55.60960 56.90426 58.19123 59.48198 60.77273 61.87776 63.40579 64.90668 66.87334 68.84000 70.39997 72.33239 74.25257 76.16990 78.08724 79.64154 81.18903 82.73651 3 75.02819 75.76937 76.51055 77.50636 78.50218 79.49799 81.09608 82.68608 82.69022 82.69437 84.07307 85.45643 88.22921 90.12556 92.29965 94.47971 96.87153 98.82022 99.70422 100.00000

0.00666 0.03382 0.00553 0.00554 0.00398 0.00398 0.00399 0.00399 0.00398 0.45119 1.65972 1.23218 1.56409 1.22361 0.00398 0.00399 0.00398 0.00398 BOBOT S/D MGG 0.41207
84 ADEDNDUM 3 75.02819
68.81666 68.85048 68.85600 68.86155 68.86553 68.86950 68.87349 68.87749 68.88147 69.33266 70.99237 72.22455 73.78864 75.01225 75.01624 75.02023 75.02421 75.02819 75.0282 75.44026

13.20706 11.94622 10.66477 9.37956 8.09279 6.99174 5.46770 3.97081 2.00813 0.49266 0.59240 (0.10784) (0.46393) (1.15766) (3.07100) (4.62131) (6.16482) (7.70832) DEVIASI (0.00000) (0.32910)

Aceh Tamiang, 14 Juli 2019


Dibuat dan Dihitung Oleh
KONTRAKTOR PELAKSANA
PT. DWIFARITA FAJARKHARISMA

Basuki Setyawan, ST
Site Manager
WAKTU PELAKSANAAN
VOLUME MINGGU
SATUAN BOBOT (%) SKALA MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 11 ADD KONTRAK BOBOT MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20 MINGGU 21 MINGGU 22 MINGGU 23 MINGGU 24 MINGGU 25 MINGGU 26 MINGGU 27 MINGGU 28 MINGGU 29 MINGGU 30 MINGGU 31 MINGGU 32 MINGGU 33 MINGGU 34 ADD KONTRAK BOBOT MINGGU 35 MINGGU 36 MINGGU 37 MINGGU 38 MINGGU 39 MINGGU 40 MINGGU 41 MINGGU 42 MINGGU 43 MINGGU 44 MINGGU 45 MINGGU 46 MINGGU 47 MINGGU 48 MINGGU 49 MINGGU 50 MINGGU 51 MINGGU 52 MINGGU 53 MINGGU 54 MINGGU 55 MINGGU 56 MINGGU 57 MINGGU 58 MINGGU 59 MINGGU 60 MINGGU 61 MINGGU 62 MINGGU 63 MINGGU 64 MINGGU 65
Uraian Sub Output / Sub Output 10
REALISASI S.D
Komponen Sub Komponen Detail 04/09/2017 11/09/2017 18/09/2017 25/09/2017 02/10/2017 09/10/2017 16/10/2017 23/10/2017 30/10/2017 06/11/2017 13/11/2017 REALISASI S.D MINGGU 11 VOLUME ACTUAL SISA 20/11/2017 27/11/2017 04/12/2017 11/12/2017 18/12/2017 25/12/2017 01/01/2018 08/01/2018 15/01/2018 22/01/2018 29/01/2018 05/02/2018 12/02/2018 19/02/2018 26/02/2018 05/03/2018 12/03/2018 19/03/2018 26/03/2018 02/04/2018 09/04/2018 16/04/2018 23/04/2018 VOLUME ACTUAL 30/04/2018 07/05/2018 14/05/2018 21/05/2018 28/05/2018 04/06/2018 11/06/2018 18/06/2018 25/06/2018 02/07/2018 09/07/2018 16/07/2018 23/07/2018 30/07/2018 06/08/2018 13/08/2018 20/08/2018 27/08/2018 03/09/2018 10/09/2018 17/09/2018 24/09/2018 01/10/2018 08/10/2018 15/10/2018 22/10/2018 29/10/2018 05/11/2018 12/11/2018 19/11/2018 26/11/2018
MINGGU 34 SISA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
10/09/2017 17/09/2017 24/09/2017 01/10/2017 08/10/2017 15/10/2017 22/10/2017 29/10/2017 05/11/2017 12/11/2017 19/11/2017 26/11/2017 03/12/2017 10/12/2017 17/12/2017 24/12/2017 31/12/2017 07/01/2018 14/01/2018 21/01/2018 28/01/2018 04/02/2018 11/02/2018 18/02/2018 25/02/2018 04/03/2018 11/03/2018 18/03/2018 25/03/2018 01/04/2018 08/04/2018 15/04/2018 22/04/2018 29/04/2018 06/05/2018 13/05/2018 20/05/2018 27/05/2018 03/06/2018 10/06/2018 17/06/2018 24/06/2018 01/07/2018 08/07/2018 15/07/2018 22/07/2018 29/07/2018 05/08/2018 12/08/2018 19/08/2018 26/08/2018 02/09/2018 09/09/2018 16/09/2018 23/09/2018 30/09/2018 07/10/2018 14/10/2018 21/10/2018 28/10/2018 04/11/2018 11/11/2018 18/11/2018 25/11/2018 02/12/2018

UMUM

1.1. DESAIN, SURVEI, DAN PERIJINAN


100
1.1.1. DESAIN, SURVEI, DAN PERIJINAN
1 Pengukuran topography m2 90,000.00 0.25443 0.0688 0.0688 0.0688 0.0688 0.07464 90,000.00 m2 0.2544 0.1798 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.19787 90,000.00 m2 0.25443 0.05656 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082
2 Pembuatan shop drawing dan asbuilt drawing set 2.00 0.06425 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.00869 2.00 set 0.0642 0.0556 0.03212 2.00 set 0.06425 0.03212

3 Penyelidikan tanah
a. DCP ttk 30.00 0.00385 0.00008 0.00008 0.00008 0.00412 30.00 ttk 0.0039 - 0.0003 - 0.00009 - 0.00009 - 0.00009 0.00385 30.00 ttk 0.00385 -
b. Sand Cone ttk 445.00 0.08577 0.00164 0.00164 0.00164 - 445.00 ttk 0.0858 0.0858 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.02679 400.00 ttk 0.07710 0.05031
c. Plat Bearing ttk 60.00 0.02120 0.00045 0.00045 0.00045 - 60.00 ttk 0.0212 0.0212 - 60.00 ttk 0.02120 0.02120
d. Penyelidikan sampel quarry ttk 6.00 0.01542 0.0042 0.0042 0.0042 0.0042 0.00556 6.00 ttk 0.0154 0.0099 0.00164 0.00164 0.00164 0.00164 0.00164 0.00164 0.00514 6.00 ttk 0.01542 0.01028 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171
e. Soundering test ttk 10.00 0.02409 ttk 0.02409 10.00 ttk 0.02409 - -
1.2. MANAJEMEN LAPANGAN
1.2.1. ADMINISTRASI LAPANGAN
1 Dokumentasi bln 24.00 0.04626 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00491 24.00 bln 0.0463 0.0414 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.01371 24.00 bln 0.04626 0.03255 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047
2 Jaga malam,peralatan kerja dan mesin - mesin oh 720.00 0.36638 - 720.00 oh 0.3664 0.3664 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.12111 720.00 oh 0.36638 0.24527 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355
1.2.2. OPERASIONAL KANTOR LAPANGAN
1 Membuat dan membongkar direksi keet, los kerja, dan guda m2 108.00 0.06556 0.0177 0.0177 0.05914 108.00 m2 0.0656 0.0064 0.05463 108.00 m2 0.06556 0.01093
2 Papan nama pekerjaan m2 4.00 0.00370 0.0040 0.00401 4.00 m2 0.0037 - 0.00031 - 0.00031 0.00370 4.00 m2 0.00370 -
3 Operasional direksikeet set 1.00 0.03212 0.0348 0.02608 1.00 set 0.0321 0.0060 0.03212 1.00 set 0.03212 -

1.3. MOBILISASI DAN DEMOBILISASI


1.3.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
1 Mobilisasi dan demobilisasi Peralatan Berat pkt 1.00 0.12850 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.06954 1.00 pkt 0.1285 0.0590 0.0642 1.00 pkt 0.12850 0.06425
2 Perbaikan jalan akses masyarakat m2 3,920.00 0.76212 - 3,920.00 m2 0.7621 0.7621 - 3,600.00 m2 0.69991 0.69991
3. Relokasi tiang PLN ttk 14.00 0.19132 14.00 ttk 0.1913 0.1913 0.0957 0.0957 0.1913 14.00 ttk 0.19132 -
JALUR DAN BANGUNAN
2.1. SIPIL
2.1.1 Pekerjaan Persiapan
1 Pembersihan lapangan dan perataan m2 71,138.20 0.26509 0.0465 0.0465 0.0465 0.28694 71,138.20 m2 0.2651 - 0.0218 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 0.26509 71138.2008 m2 0.26509 -
2 Pembongkaran bangunan m2 1,920.00 0.65899 1,920.00 m2 0.6590 0.6590 0.16475 0.16475 0.16475 0.16475 0.65899 1920.00 m2 0.65899 -
2.1.2. PERBAIKAN TANAH DASAR
1 Perkuatan dengan geotekstile m2 12,500.00 3.83249 0.1106 0.1106 0.1106 - 12,500.00 m2 3.8325 3.8325 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 2.91269 12,500.00 m2 3.83249 0.91980

2.1.2. KONSTRUKSI TUBUH BAAN


1 Stripping / pengupasan lapisan tanah dasar mak 50cm m2 37,946.70 0.71191 0.0197 0.0197 0.0197 0.56679 37,946.70 m2 0.7119 0.1451 0.1451 0.52363 27,910.93 m2 0.52363 -
2 Timbunan dengan material tanah pilihan m3 154,783.87 20.96365 0.30599 0.30599 0.30599 0.51310 154,783.87 m3 20.9637 20.4506 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 13.58909 155,308.556 m3 21.03472 7.44562
70
3 Timbunan dengan sirtu (sub balas) m3 8,214.25 1.46401 - 8,214.25 m3 1.4640 1.4640 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 - 8,214.25 m3 1.46401 1.46401
4 Galian tanah dengan alat berat m3 31,751.49 1.85642 0.2325 0.2325 0.2325 0.07229 31,751.49 m3 1.8564 1.7841 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.92255 36,035.35 m3 2.10688 1.18434
5 Membuang Tanah sejauh 30 m m3 31,751.49 0.70993 0.0889 0.0889 0.0889 0.01075 31,751.49 m3 0.7099 0.6992 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.34888 36,035.35 m3 0.80571 0.45683

2.1.2. DRAINASE
1 Drainase beton pracetak 80x80 cm tebal 10 cm m' 3,362.40 7.39092 - 3,362.40 m' 7.3909 7.3909 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 - 3,351.00 m' 7.36586 7.36586 - -

2 Retaining wall
Galian Tanah m3 15,287.04 0.89379 - 15,287.04 m3 0.8938 0.8938 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.27922 15,004.76 m3 0.87729 0.59807 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120
Pasangan batu kosong m3 1,488.54 0.55260 - 1,488.54 m3 0.5526 0.5526 0.0089 0.0089 0.0089 0.0089 0.0089 0.0089 0.31404 1,436.76 m3 0.53337 0.21933 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m2 744.27 0.84449 - 744.27 m2 0.8445 0.8445 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.43022 718.38 m2 0.81511 0.38488 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069
Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 m3 9,930.52 12.16727 - 9,930.52 m3 12.1673 12.1673 0.1962 0.1962 0.1962 0.1962 0.1962 0.1962 3.15151 9,520.03 m3 11.66433 8.51281 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520
Pembesian dengan besi ulir m3 830,160.18 14.82782 - 830,160.18 m3 14.8278 14.8278 0.2392 0.2392 0.2392 0.2392 0.2392 0.2392 6.32121 809,155.34 kg 14.45265 8.13144 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452
Urugan pasir m3 744.27 0.16325 - 744.27 m3 0.1633 0.1633 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.08317 718.38 m3 0.15758 0.07441 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
Bekisting m2 21,675.20 10.92931 - 21,675.20 m2 10.9293 10.9293 0.1763 0.1763 0.1763 0.1763 0.1763 0.1763 2.43521 20,652.24 m2 10.41350 7.97829 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425

2.2 JALAN REL


2.2.1. MATERIAL JALAN KA
1 Angkutan rel ton 324.00 0.37354 - 324.00 ton 0.3735 0.3735 - 324.00 ton 0.37354 0.37354
2 Bantalan Kayu untuk MJ lengkap dengan aksesoris ttk 40.00 0.50863 - 40.00 ttk 0.5086 0.5086 - 40.00 ttk 0.50863 0.50863

3 Ecer Bantalan Beton Beserta alat penambat btg 4,834.00 0.23169 - 4,834.00 btg 0.2317 0.2317 - 4834.00 btg 0.23169 0.23169
4 Angkutan Bantalan Beton Lengkap Dengan Alat Penambat Elastis /btg btg 4,834.00 0.37084

2.2.2. KONSTRUKSI JALAN KA


1 Pengadaan dan pengeceran balas m3 4,785.00 2.1631 - 4,785.00 m3 2.1631 2.1631 - 4785.00 m3 2.16311 2.16311

2 Pemasangan track R.54 dengan pemecokan awal m'sp 2,900.00 0.8657 - 2,900.00 m'sp 0.8657 0.8657 - 2900.00 m'sp 0.86566 0.86566
3 MTT msp 2,900.00 0.4923 - 2,900.00 msp 0.4923 0.4923 - 2900.00 msp 0.49227 0.49227
4 PBR msp 2,900.00 0.0261 - 2,900.00 msp 0.0261 0.0261 - 2900.00 msp 0.02609 0.02609
5 Pengelasan flash butt R.54 titik 192.00 0.8512 - 192.00 titik 0.8512 0.8512 - 192.00 titik 0.85118 0.85118

2.3. PENDUKUNG JALUR DAN BANGUNAN


50
2.3.1. PAPAN INFORMASI KONSTRUKSI
1 Patok KM-HM buah 30.00 0.0327 - 30.00 buah 0.0327 0.0327 - 30.00 buah 0.03266 0.03266
2 Tanda-tanda lintas set 1.00 0.0017 - 1.00 set 0.0017 0.0017 - 1.00 set 0.00175 0.00175
50
3 Pemasangan pagar sterilisasi panel beton t=120 cm m' 3,000.00 4.5111 - 3,000.00 m' 4.5111 4.5111 0.09398 0.09398 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 4.51110 3,000.00 m' 4.51110 -

2.7. JEMBATAN

1 Underpass akses masyarakat uk. 6x5,5 (2 unit)


2 Box Culvert uk. 4x4 (1 unit)
3 Jembatan Perlintasan Jalan Nasional
1. 'PEKERJAAN PONDASI
2. PEKERJAAN ABUTMEN
3. 'PEKERJAAN DECK
4. 'I GIRDER
5. 'BEARING
6. 'EXPANSION JOINT

Box Culvert uk. 1x1 (2 unit)


Galian Tanah m3 84.49 0.0049 - 84.49 m3 0.00494 0.00494 0.00247 0.00247
Pasangan batu kosong m3 10.49 0.0039 - 6.60 m3 0.00245 0.00245 0.00245
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.20 0.0070 - 3.30 m3 0.00374 0.00374 0.00374
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 45.66 0.0628 - 80.48 m3 0.11073 0.11073 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384
Pembesian dengan besi ulir kg 5,447.89 0.0973 - 7,034.97 kg 0.12565 0.12565 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571
Urugan pasir m3 6.20 0.0014 - 3.30 m3 0.00072 0.00072 0.00072
Structural Backfill m3 64.35 0.0071 - 64.35 m3 0.00710 0.00710 0.00355 0.00355
Bekisting m2 237.96 0.1200 - 347.64 m2 0.17529 0.17529 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191

Box Culvert Uk. 2x2 (12 unit)


Galian Tanah m3 2,413.94 0.1411 - 2,488.42 m3 0.14549 0.14549 0.03637 0.03637 0.03637 0.03637
Pasangan batu kosong m3 138.68 0.0515 - 126.10 m3 0.04681 0.04681 0.00585 0.00585 0.00585 0.00585 0.00585 0.00585
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 69.34 0.0787 - 63.05 m3 0.07154 0.07154 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 856.70 1.1787 - 1,148.23 m3 1.57978 1.57978 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319
Pembesian dengan besi ulir kg 119,199.98 2.1291 - 124,190.18 kg 2.21821 2.21821 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873
Urugan pasir m3 69.34 0.0152 - 63.05 m3 0.01383 0.01383 0.00173 0.00173 0.00173 0.00173 0.00173 0.00173
Structural Backfill m3 1,052.25 0.1161 REALISASI MINGGUAN - 1,109.44 m3 0.12246 0.12246
Bekisting m2 3,432.11 1.7306 - 4,315.16 m2 2.17584 2.17584 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703

Underpass Warga 4x4 (1 unit)


Galian Tanah m3 158.08 0.0092 - 158.08 m3 0.00924 0.00924
Pasangan batu kosong m3 12.74 0.0047 - 12.74 m3 0.00473 0.00473
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.37 0.0072 - 6.37 m3 0.00723 0.00723
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 126.99 0.1747 - 166.19 m3 0.22865 0.22865
Pembesian dengan besi ulir kg 18,079.49 0.3229 - 19,806.47 kg 0.35377 0.35377
Urugan pasir m3 6.37 0.0014 - 6.37 m3 0.00140 0.00140
Structural Backfill m3 200.85 0.0222 - 200.85 m3 0.02217 0.02217
Bekisting m2 388.05 0.1957 - 493.07 m2 0.24862 0.24862

Box Culvert Uk. 4x4x2 (1 unit)


Galian Tanah m3 420.86 0.0246 - 420.86 m3 0.02461 0.02461
Pasangan batu kosong m3 40.48 0.0150 - 40.48 m3 0.01503 0.01503
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 20.24 0.0230 - 20.24 m3 0.02297 0.02297
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 323.26 0.4448 - 346.40 m3 0.47660 0.47660
Pembesian dengan besi ulir kg 37,808.67 0.6753 - 38,738.53 kg 0.69192 0.69192
Urugan pasir m3 20.24 0.0044 - 20.24 m3 0.00444 0.00444
Structural Backfill m3 339.90 0.0375 - 339.90 m3 0.03752 0.03752
Bekisting m2 812.61 0.4097 - 1,005.77 m2 0.50714 0.50714

Box Culvert Uk. 6x4x2 (1 unit)


Galian Tanah m3 367.08 0.0215 - 138.15 m3 0.00808 0.00808
Pasangan batu kosong m3 19.88 0.0074 - 34.08 m3 0.01265 0.01265
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 9.94 0.0113 RENCANA MINGGUAN - 17.04 m3 0.01933 0.01933
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 205.10 0.2822 - 352.28 m3 0.48468 0.48468
Pembesian dengan besi ulir kg 26,062.73 0.4655 - 23,923.23 kg 0.42730 0.42730
Urugan pasir m3 9.94 0.0022 - 17.04 m3 0.00374 0.00374
Structural Backfill m3 108.15 0.0119 - 185.40 m3 0.02046 0.02046
Bekisting m2 638.47 0.3219 - 1,071.23 m2 0.54015 0.54015

1. Bobok Beton m3 54.00 0.0328

100.0000

BOBOT RENCANA MINGGUAN : 0.10408 0.13485 0.08233 0.08233 0.01766 0.01766 0.01766 0.01766 0.80689 0.80689 0.80689 BOBOT S/D MGG 11 KONTRAK 90.33051 88.62395 0.77159 0.62677 0.62677 0.62677 0.55768 0.55768 0.46038 0.61368 0.61641 0.61641 0.64756 0.64756 0.77945 0.77945 0.87343 0.87352 0.87352 1.52479 1.52479 1.52479 1.52479 1.52479 1.52479 BOBOT S/D MGG 100.00000 62.48267 0.47096 0.47096 0.47096 0.47096 0.47096 0.47096 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.47171 0.47489 0.52445 0.52070 0.52070 0.52070 0.52070 0.52070 0.52070 0.52425 0.76081 0.75726 0.75726 0.75726 0.72089 0.72089
2.05980 34 KONTRAK ADD 40.05563
BOBOT KOMULATIF RENCANA MINGGUAN : 0.00000 0.10408 0.23893 0.32127 0.40360 0.42126 0.43892 0.45657 0.47423 1.28112 2.08800 2.89489 2.05980 2.83139 3.45815 4.08492 4.71169 5.26937 5.82705 6.28743 6.90111 7.51752 8.13393 8.78149 9.42904 10.20849 10.98795 11.86138 12.73490 13.60842 15.13320 16.65799 18.18278 19.70756 21.23235 22.75714 1 37.51733 37.98828 38.45924 38.93020 39.40115 39.87211 40.34307 40.81231 41.28155 41.75080 42.22004 42.68929 43.15853 43.62777 44.09702 44.56626 45.03797 45.51286 46.03731 46.55801 47.07871 47.59941 48.12012 48.64082 49.16152 49.68578 50.44659 51.20385 51.96111 52.71837 53.43925 54.16014

BOBOT REALISASI MINGGUAN : 0 0.00000 0.00089 0.00445 0.00289 0.02451 0.08435 0.10977 0.93832 0.19340 0.17848 0.52273 BOBOT S/D MGG 11 ADEDNDUM 14.72893 9.14805 4.14984 0.60500 0.224118367 0.004245882 0.0042460879 0.1142995229 0.2389351383 0.17170 0.0059133922 0.0042502292 0.0962884709 0.1480664149 0.1067039507 0.17744 0.90731 1.31701 1.30047 1.53812 1.00613 2.02172 0.00425 BOBOT S/D MGG 1.23430 2.42714 1.61500 1.61087 1.50734 0.87979 0.00398 0.00398 1.68580 1.14925 0.59724 0.59723 1.63629 1.88968 2.32309 1.86242 0.96559 0.96972 0.09164 0.00976 0.72043 0.74694 0.61818 0.65034 0.61818 0.61973 1.16108 1.23422 0.62065 0.61818 0.61818
2.03259 34 ADEDNDUM 2 37.51733
BOBOT KOMULATIF REALISASI MINGGUAN : 0 0.00000 0.00089 0.00535 0.00824 0.03275 0.11710 0.22687 1.16519 1.35859 1.53707 2.05980 2.03259 16.76152 16.76152 25.90957 30.05941 30.66441 30.88853 30.89277 30.89702 31.01132 31.25025 31.42195 31.42786 31.43211 31.52840 31.67647 31.78317 31.96062 32.86793 34.18494 35.48541 37.02353 38.02966 40.05138 40.05563 37.517327486 38.75163 41.17876 42.79377 44.40464 45.91198 46.79177 46.79574 46.79973 48.48553 49.63478 50.23201 50.82925 52.46554 54.35521 56.67831 58.54073 59.50632 60.47604 60.56768 60.57744 61.29787 62.04481 62.66299 63.31332 63.93150 64.55124 65.71232 66.94653 67.56718 68.18536 68.80352

DEVIASI : -0.10408 -0.23804 -0.31592 -0.39536 -0.38850 -0.32182 -0.22970 0.69096 0.07748 -0.55093 -0.83509 DEVIASI 0.02721 13.93013 22.45141 25.97449 25.95272 25.61916 25.06572 24.60959 24.11021 23.73273 23.28802 22.64638 22.00307 21.31991 20.68852 19.92179 19.22572 19.25951 19.05173 18.82742 18.84075 18.32209 18.81903 17.29849 DEVIASI 2.53830 0.76333 2.71951 3.86357 5.00349 6.03987 6.44871 5.98344 5.51818 6.73473 7.41474 7.54273 7.67072 8.83777 10.25820 12.11205 13.50276 13.99346 14.43873 14.00967 13.49873 13.69846 13.92469 14.02217 14.15180 14.24572 14.10465 14.50847 14.98543 14.84881 14.74610 14.64339

Mengetahui Disetujui Oleh


BALAI TEKNIK PERKERETAAPIAN KONSULTAN SUPERVISI
KELAS II WILAYAH SUMATERA BAGIAN UTARA PT. HARAWANA CONSULTANT
PEJABAT PEMBUAT KOMITMEN ACEH WILAYAH II

Rangga Perdana Aminsaputra John F Sitompul, ST


NIP. 19931222 201801 1 002 Team Leader
KET
MINGGU 66 MINGGU 67 MINGGU 68 MINGGU 69 MINGGU 70 MINGGU 71 MINGGU 72 MINGGU 73 MINGGU 74 MINGGU 75 MINGGU 76 MINGGU 77 MINGGU 78 MINGGU 79 MINGGU 80 MINGGU 81 MINGGU 82 MINGGU 83 MINGGU 84 ADD KONTRAK BOBOT MINGGU 85 MINGGU 86 MINGGU 87 MINGGU 88 MINGGU 89 MINGGU 90 MINGGU 91 MINGGU 92 MINGGU 93 MINGGU 94 MINGGU 95 MINGGU 96 MINGGU 97 MINGGU 98 MINGGU 99 ADD KONTRAK BOBOT MINGGU 100 MINGGU 101 MINGGU 102 MINGGU 103 MINGGU 104 MINGGU 105 MINGGU 106 MINGGU 107 MINGGU 108 MINGGU 109 MINGGU 110 MINGGU 111 MINGGU 112 MINGGU 113 MINGGU 114 MINGGU 115 MINGGU 116 MINGGU 117 MINGGU 118 MINGGU 119 MINGGU 120 MINGGU 121 MINGGU 122
03/12/2018 10/12/2018 17/12/2018 24/12/2018 31/12/2018 07/01/2019 14/01/2019 21/01/2019 28/01/2019 04/02/2019 11/02/2019 18/02/2019 25/02/2019 04/03/2019 11/03/2019 18/03/2019 25/03/2019 01/04/2019 08/04/2019
REALISASI S.D VOLUME ACTUAL 15/04/2019 22/04/2019 29/04/2019 06/05/2019 13/05/2019 20/05/2019 27/05/2019 03/06/2019 10/06/2019 17/06/2019 24/06/2019 01/07/2019 08/07/2019 15/07/2019 22/07/2019
REALISASI S.D VOLUME ACTUAL 29/07/2019 05/08/2019 12/08/2019 19/08/2019 26/08/2019 02/09/2019 09/09/2019 16/09/2019 23/09/2019 30/09/2019 07/10/2019 14/10/2019 21/10/2019 28/10/2019 04/11/2019 11/11/2019 18/11/2019 25/11/2019 02/12/2019 09/12/2019 16/12/2019 23/12/2019 30/12/2019
MINGGU 84 SISA MINGGU 99 SISA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
09/12/2018 16/12/2018 23/12/2018 30/12/2018 06/01/2019 13/01/2019 20/01/2019 27/01/2019 03/02/2019 10/02/2019 17/02/2019 24/02/2019 03/03/2019 10/03/2019 17/03/2019 24/03/2019 31/03/2019 07/04/2019 14/04/2019 21/04/2019 28/04/2019 05/05/2019 12/05/2019 19/05/2019 26/05/2019 02/06/2019 09/06/2019 16/06/2019 23/06/2019 30/06/2019 07/07/2019 14/07/2019 21/07/2019 28/07/2019 04/08/2019 11/08/2019 18/08/2019 25/08/2019 01/09/2019 08/09/2019 15/09/2019 22/09/2019 29/09/2019 06/10/2019 13/10/2019 20/10/2019 27/10/2019 03/11/2019 10/11/2019 17/11/2019 24/11/2019 01/12/2019 08/12/2019 15/12/2019 22/12/2019 29/12/2019 31/12/2019

0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.25443 90,000.00 m2 0.25443 - - - 0.254 90,000.00 m2 0.254 -
0.03212 2.00 set 0.06425 0.03212 0.032 2.00 set 0.064 0.032 0.032
-
0.00385 30.00 ttk 0.00385 - 0.004 30.00 ttk 0.004 -
0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.05031 445.00 ttk 0.08577 0.03547 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.060 445.00 ttk 0.086 0.026 0.009 0.009 0.009
- ttk 0.02120 0.02120 - - 0.0053 0.0053 0.0053 0.0053 0.004 60.00 ttk 0.021 0.018 0.009 0.009
0.00514 6.00 ttk 0.01542 0.01028 0.00514 0.00514 0.005 6.00 ttk 0.015 0.010 0.005 0.005
0.02409 10.00 ttk 0.02409 - 0.024 10.00 ttk 0.024 -

0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.03466 24.00 bln 0.04626 0.01160 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.041 24.00 bln 0.046 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.29921 720.00 oh 0.36638 0.06717 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.353 720.00 oh 0.366 0.014 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

0.05463 108.00 m2 0.06556 0.01093 0.055 108.00 m2 0.066 0.011 0.011


0.00370 4.00 m2 0.00370 - 0.004 4.00 m2 0.004 -
0.03212 1.00 set 0.03212 - 0.032 1.00 set 0.032 -

0.06425 1.00 pkt 0.12850 0.06425 0.064 1.00 pkt 0.128 0.064 0.032 0.032
- 3,920.00 m2 0.76212 0.76212 - 3,920.00 m2 0.762 0.762 0.381 0.381
0.19132 14.00 ttk 0.19132 - 0.191 14.00 ttk 0.191 -

0.26509 71,138.20 m2 0.26509 - 0.265 71,138.20 m2 0.265 -


0.65899 1,920.00 m2 0.65899 - 0.659 1,920.00 m2 0.659 -

0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 3.83249 12,500.00 m2 3.83249 - 3.832 12,500.00 m2 3.832 -

0.52363 37,946.70 m2 0.71191 0.18828 0.03766 0.03766 0.03766 0.03766 0.03766 0.712 37,946.70 m2 0.712 -
0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 18.89775 154,783.87 m3 20.96365 2.06590 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 18.898 154,783.87 m3 20.964 2.066 0.258 0.258 0.258 0.258 0.258 0.258 0.258 0.258
- 8,214.25 m3 1.46401 1.46401 0.4880 0.4880 0.4880 0.878 8,214.25 m3 1.464 0.586 0.146 0.146 0.146 0.146
0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 1.81417 31,751.49 m3 1.85642 0.04225 0.0070 0.0070 0.0070 0.0070 0.0070 0.0070 1.856 31,751.49 m3 1.856 -
0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.68985 31,751.49 m3 0.70993 0.02008 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.710 31,751.49 m3 0.710 -

0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 5.61595 3,362.40 m' 7.39092 1.77497 0.8875 0.8875 6.606 3,362.40 m' 7.391 0.785 0.157 0.157 0.157 0.157 0.157

0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.78240 15,287.04 m3 0.89379 0.11139 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.894 15,287.04 m3 0.894 -
0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.40428 1,488.54 m3 0.55260 0.14832 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.492 1,488.54 m3 0.553 0.061 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.69951 744.27 m2 0.84449 0.14497 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.833 744.27 m2 0.844 0.012 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 8.79320 9,930.52 m3 12.16727 3.37407 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 10.640 9,930.52 m3 12.167 1.527 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109
0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 13.12466 830,160.18 kg 14.82782 1.70316 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 14.766 830,160.18 kg 14.828 0.062 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.11943 744.27 m3 0.16325 0.04382 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.161 744.27 m3 0.163 0.002 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 7.92599 21,675.20 m2 10.92931 3.00332 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.4378 0.1565 0.15651 9.648 21,675.20 m2 10.929 1.281 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092

- 324.00 ton 0.37354 0.37354 0.18677 - 324.00 ton 0.374 0.374 0.093 0.093 0.093 0.093
- 40.00 ttk 0.50863 0.50863 0.25431 - 40.00 ttk 0.509 0.509 0.254 0.254
- 4,834.00 btg 0.23169 0.23169 0.11585 - 4,834.00 btg 0.232 0.232 0.058 0.058 0.058 0.058
- 4,834.00 btg 0.37084 0.37084 0.18542 - 4,834.00 btg 0.371 0.371 0.093 0.093 0.093 0.093

- 4,785.00 m3 2.16311 2.16311 0.54078 - 4,785.00 m3 2.163 2.163 0.721 0.721 0.721
- 2,900.00 m'sp 0.86566 0.86566 - 2,900.00 m'sp 0.866 0.866 0.433 0.433
- 2,900.00 msp 0.49227 0.49227 - 2,900.00 msp 0.492 0.492 0.246 0.246
- 2,900.00 msp 0.02609 0.02609 - 2,900.00 msp 0.026 0.026 0.013 0.013
- 192.00 titik 0.85118 0.85118 - 192.00 titik 0.851 0.851 0.426 0.426

- 30.00 buah 0.03266 0.03266 - 30.00 buah 0.033 0.033 0.033


- 1.00 set 0.00175 0.00175 - 1.00 set 0.002 0.002 0.002
4.51110 3,000.00 m' 4.51110 - 4.511 3,000.00 m' 4.511 -

0.00269 84.49 m3 0.00494 0.00225 0.00225 0.005 84.49 m3 0.005 -


0.00134 10.49 m3 0.00389 0.00256 0.00256 0.004 10.49 m3 0.004 -
0.00204 6.20 m3 0.00704 0.00500 0.00500 0.007 6.20 m3 0.007 -
0.05269 45.66 m3 0.06282 0.01012 0.00506 0.00506 0.063 45.66 m3 0.063 -
0.06301 5,447.89 kg 0.09731 0.03430 0.01715 0.01715 0.097 5,447.89 kg 0.097 -
0.00039 6.20 m3 0.00136 0.00097 0.00097 0.001 6.20 m3 0.001 -
0.00387 64.35 m3 0.00710 0.00323 0.00323 0.007 64.35 m3 0.007 -
0.08514 237.96 m2 0.11999 0.03484 0.01742 0.01742 0.120 237.96 m2 0.120 -

0.11408 2,413.94 m3 0.14114 0.02705 0.02705 0.141 2,413.94 m3 0.141 -


0.00585 0.00585 0.04139 138.68 m3 0.05148 0.01010 0.01010 0.051 138.68 m3 0.051 -
0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.06325 69.34 m3 0.07868 0.01543 0.01543 0.079 69.34 m3 0.079 -
0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.94574 856.70 m3 1.17868 0.23294 0.11647 0.11647 1.179 856.70 m3 1.179 -
0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 1.71452 119,199.98 kg 2.12908 0.41456 0.20728 0.20728 2.129 119,199.98 kg 2.129 -
0.00173 0.00173 0.01223 69.34 m3 0.01521 0.00298 0.00298 0.015 69.34 m3 0.015 -
0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.09393 1,052.25 m3 0.11615 0.02222 0.02222 0.116 1,052.25 m3 0.116 -
0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 1.38546 3,432.11 m2 1.73058 0.34512 0.17256 0.17256 1.731 3,432.11 m2 1.731 -

0.00462 0.00462 0.00924 158.08 m3 0.00924 - 0.009 158.08 m3 0.009 -


0.00236 0.00236 0.00473 12.74 m3 0.00473 - 0.005 12.74 m3 0.005 -
0.00361 0.00361 0.00723 6.37 m3 0.00723 - 0.007 6.37 m3 0.007 -
0.05716 0.05716 0.05716 0.05716 0.17471 126.99 m3 0.17471 - 0.175 126.99 m3 0.175 -
0.08844 0.08844 0.08844 0.08844 0.32292 18,079.49 kg 0.32292 - 0.323 18,079.49 kg 0.323 -
0.00070 0.00070 0.00140 6.37 m3 0.00140 - 0.001 6.37 m3 0.001 -
0.00739 0.00739 0.00739 0.02217 200.85 m3 0.02217 - - 0.022 200.85 m3 0.022 -
0.06215 0.06215 0.06215 0.06215 0.19567 388.05 m2 0.19567 - 0.196 388.05 m2 0.196 -

0.01230 0.01230 - 420.86 m3 0.02461 0.02461 0.02461 - 420.86 m3 0.025 0.025 0.025
0.00751 0.00751 - 40.48 m3 0.01503 0.01503 0.01503 - 40.48 m3 0.015 0.015 0.015
0.01148 0.01148 - 20.24 m3 0.02297 0.02297 0.02297 - 20.24 m3 0.023 0.023 0.023
0.11915 0.11915 0.11915 0.11915 - 323.26 m3 0.44476 0.44476 0.22238 0.22238 - 323.26 m3 0.445 0.445 0.111 0.111 0.111 0.111
0.17298 0.17298 0.17298 0.17298 - 37,808.67 kg 0.67532 0.67532 0.49283 0.18249 - 37,808.67 kg 0.675 0.675 0.169 0.169 0.169 0.169
0.00222 0.00222 - 20.24 m3 0.00444 0.00444 0.00444 - 20.24 m3 0.004 0.004 0.004
0.01251 0.01251 0.01251 - 339.90 m3 0.03752 0.03752 0.03752 - 339.90 m3 0.038 0.038 0.038
0.12679 0.12679 0.12679 0.12679 - 812.61 m2 0.40975 0.40975 0.20487 0.20487 - 812.61 m2 0.410 0.410 0.137 0.137 0.137

0.00404 0.00404 - 367.08 m3 0.02146 0.02146 0.02146 0.021 367.08 m3 0.021 -


0.00633 0.00633 - 19.88 m3 0.00738 0.00738 0.00738 0.007 19.88 m3 0.007 -
0.00967 0.00967 - 9.94 m3 0.01128 0.01128 0.01128 0.011 9.94 m3 0.011 -
0.12117 0.12117 0.12117 0.12117 - 205.10 m3 0.28219 0.28219 0.09406 0.09406 0.09406 0.282 205.10 m3 0.282 -
0.10683 0.10683 0.10683 0.10683 - 26,062.73 kg 0.46552 0.46552 0.15517 0.23611 0.07423 0.466 26,062.73 kg 0.466 -
0.00187 0.00187 - 9.94 m3 0.00218 0.00218 0.00218 0.002 9.94 m3 0.002 -
0.00682 0.00682 0.00682 - 108.15 m3 0.01194 0.01194 0.01194 0.012 108.15 m3 0.012 -
0.13504 0.13504 0.13504 0.13504 - 638.47 m2 0.32194 0.32194 0.16097 0.16097 0.322 638.47 m2 0.322 -

- 54.00 m3 0.03279 0.03279 0.03279 - 54.00 m3 0.033 0.033 0.016 0.016

0.72089 0.72857 1.29466 1.28697 1.29075 1.29075 1.10503 1.52803 1.50089 1.96666 1.96666 1.55998 1.93242 1.92018 1.91734 1.91734 1.55430 1.54748 1.54748 BOBOT S/D MGG 100.00000 24.97181 0.74118 0.74118 0.99581 0.99581 0.99581 1.59809 1.59000 0.00415 0.00415 1.37870 1.38336 2.77279 1.89635 2.17409 2.18006 BOBOT S/D MGG 100.000 14.909 0.216 0.216 0.211 0.211 0.211 0.211 0.228 0.494 0.545 0.895 0.886 0.886 0.933 0.616 0.571 1.278 1.377 1.810 0.835 0.686 0.718 0.448 0.425
84 KONTRAK ADD 75.02819 99 KONTRAK ADD 85.09150
54.88103 55.60960 56.90426 58.19123 59.48198 60.77273 61.87776 63.40579 64.90668 66.87334 68.84000 70.39997 72.33239 74.25257 76.16990 78.08724 79.64154 81.18903 82.73651 3 75.02819 75.76937 76.51055 77.50636 78.50218 79.49799 81.09608 82.68608 82.69022 82.69437 84.07307 85.45643 88.22921 90.12556 92.29965 94.47971 3 85.091 85.30783 85.524 85.735 85.947 86.158 86.369 86.597 87.091 87.636 88.531 89.417 90.303 91.236 91.852 92.423 93.701 95.079 96.889 97.723 98.409 99.127 99.575 100.000

0.00647 0.00666 0.03382 0.00553 0.00554 0.00398 0.00398 0.00399 0.00399 0.00398 0.45119 1.65972 1.23218 1.56409 1.22361 0.00398 0.00399 0.00398 0.00398 BOBOT S/D MGG 0.41207 0.00400 0.00400 0.00398 0.00398 0.09723 0.00397 0.00397 0.00398 0.00398 0.14161 0.59304 0.60112 2.99945 5.1870 BOBOT S/D MGG 0.07994 0.02935 0.34105 0.10545 0.47819 1.38760 0.3290499963 1.19140 0.74016 1.29369 0.05269 0.03752 0.00000
84 ADEDNDUM 3 75.02819 99 ADEDNDUM 3 85.09150
68.81000 68.81666 68.85048 68.85600 68.86155 68.86553 68.86950 68.87349 68.87749 68.88147 69.33266 70.99237 72.22455 73.78864 75.01225 75.01624 75.02023 75.02421 75.02819 75.0282 75.44026 75.44426 75.44825 75.45224 75.45621 75.55343 75.55740 75.56136 75.56534 75.56932 75.71093 76.30397 76.90509 79.90454 85.09150 85.091 85.17144 85.20079 85.54184 85.64729 86.12548 87.51309 87.84214 89.03354 89.77369 91.06739 91.12007 91.15759 91.15759

13.92897 13.20706 11.94622 10.66477 9.37956 8.09279 6.99174 5.46770 3.97081 2.00813 0.49266 0.59240 (0.10784) (0.46393) (1.15766) (3.07100) (4.62131) (6.16482) (7.70832) DEVIASI (0.00000) (0.32911) (1.06629) (2.05811) (3.04994) (4.04179) (5.54265) (7.12868) (7.12887) (7.12903) (8.50375) (9.74550) (11.92524) (13.22048) (12.39511) (9.38821) DEVIASI - -0.13639 -0.32338 -0.19353 -0.29928 -0.03229 1.14412 1.24557 1.94253 2.13760 2.53665 1.70330 0.85478 -0.07859

Aceh Tamiang, 27 Oktober 2019


Dibuat dan Dihitung Oleh
KONTRAKTOR PELAKSANA
PT. DWIFARITA FAJARKHARISMA

Basuki Setyawan, ST
Site Manager
VOLUME MINGGU
SATUAN BOBOT (%) SKALA MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 11 ADD KONTRAK BOBOT MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20 MINGGU 21 MINGGU 22 MINGGU 23 MINGGU 24 MINGGU 25 MINGGU 26 MINGGU 27 MINGGU 28 MINGGU 29 MINGGU 30 MINGGU 31 MINGGU 32 MINGGU 33 MINGGU 34 ADD KONTRAK BOBOT MINGGU 35 MINGGU 36 MINGGU 37 MINGGU 38 MINGGU 39 MINGGU 40 MINGGU 41 MINGGU 42 MINGGU 43 MINGGU 44 MINGGU 45 MINGGU 46 MINGGU 47 MINGGU 48 MINGGU 49 MINGGU 50 MINGGU 51 MINGGU 52 MINGGU 53 MINGGU 54 MINGGU 55 MINGGU 56 MINGGU 57 MINGGU 58 MINGGU 59 MINGGU 60 MINGGU 61 MINGGU 62 MINGGU 63 MINGGU 64 MINGGU 65
Uraian Sub Output / Sub Output 10
REALISASI S.D
Komponen Sub Komponen Detail 04/09/2017 11/09/2017 18/09/2017 25/09/2017 02/10/2017 09/10/2017 16/10/2017 23/10/2017 30/10/2017 06/11/2017 13/11/2017 REALISASI S.D MINGGU 11 VOLUME ACTUAL SISA 20/11/2017 27/11/2017 04/12/2017 11/12/2017 18/12/2017 25/12/2017 01/01/2018 08/01/2018 15/01/2018 22/01/2018 29/01/2018 05/02/2018 12/02/2018 19/02/2018 26/02/2018 05/03/2018 12/03/2018 19/03/2018 26/03/2018 02/04/2018 09/04/2018 16/04/2018 23/04/2018 VOLUME ACTUAL 30/04/2018 07/05/2018 14/05/2018 21/05/2018 28/05/2018 04/06/2018 11/06/2018 18/06/2018 25/06/2018 02/07/2018 09/07/2018 16/07/2018 23/07/2018 30/07/2018 06/08/2018 13/08/2018 20/08/2018 27/08/2018 03/09/2018 10/09/2018 17/09/2018 24/09/2018 01/10/2018 08/10/2018 15/10/2018 22/10/2018 29/10/2018 05/11/2018 12/11/2018 19/11/2018 26/11/2018
MINGGU 34 SISA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
10/09/2017 17/09/2017 24/09/2017 01/10/2017 08/10/2017 15/10/2017 22/10/2017 29/10/2017 05/11/2017 12/11/2017 19/11/2017 26/11/2017 03/12/2017 10/12/2017 17/12/2017 24/12/2017 31/12/2017 07/01/2018 14/01/2018 21/01/2018 28/01/2018 04/02/2018 11/02/2018 18/02/2018 25/02/2018 04/03/2018 11/03/2018 18/03/2018 25/03/2018 01/04/2018 08/04/2018 15/04/2018 22/04/2018 29/04/2018 06/05/2018 13/05/2018 20/05/2018 27/05/2018 03/06/2018 10/06/2018 17/06/2018 24/06/2018 01/07/2018 08/07/2018 15/07/2018 22/07/2018 29/07/2018 05/08/2018 12/08/2018 19/08/2018 26/08/2018 02/09/2018 09/09/2018 16/09/2018 23/09/2018 30/09/2018 07/10/2018 14/10/2018 21/10/2018 28/10/2018 04/11/2018 11/11/2018 18/11/2018 25/11/2018 02/12/2018

UMUM

1.1. DESAIN, SURVEI, DAN PERIJINAN


100
1.1.1. DESAIN, SURVEI, DAN PERIJINAN
1 Pengukuran topography m2 90,000.00 0.25443 0.0688 0.0688 0.0688 0.0688 0.07464 90,000.00 m2 0.2544 0.1798 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.19787 90,000.00 m2 0.25443 0.05656 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082
2 Pembuatan shop drawing dan asbuilt drawing set 2.00 0.06425 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.00869 2.00 set 0.0642 0.0556 0.03212 2.00 set 0.06425 0.03212

3 Penyelidikan tanah
a. DCP ttk 30.00 0.00385 0.00008 0.00008 0.00008 0.00412 30.00 ttk 0.0039 - 0.0003 - 0.00009 - 0.00009 - 0.00009 0.00385 30.00 ttk 0.00385 -
b. Sand Cone ttk 445.00 0.08577 0.00164 0.00164 0.00164 - 445.00 ttk 0.0858 0.0858 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.02679 400.00 ttk 0.07710 0.05031
c. Plat Bearing ttk 60.00 0.02120 0.00045 0.00045 0.00045 - 60.00 ttk 0.0212 0.0212 - 60.00 ttk 0.02120 0.02120
d. Penyelidikan sampel quarry ttk 6.00 0.01542 0.0042 0.0042 0.0042 0.0042 0.00556 6.00 ttk 0.0154 0.0099 0.00164 0.00164 0.00164 0.00164 0.00164 0.00164 0.00514 6.00 ttk 0.01542 0.01028 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171
e. Soundering test ttk 10.00 0.02409 ttk 0.02409 10.00 ttk 0.02409 - -
1.2. MANAJEMEN LAPANGAN
1.2.1. ADMINISTRASI LAPANGAN
1 Dokumentasi bln 24.00 0.04626 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00491 24.00 bln 0.0463 0.0414 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.01371 24.00 bln 0.04626 0.03255 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047
2 Jaga malam,peralatan kerja dan mesin - mesin oh 720.00 0.36638 - 720.00 oh 0.3664 0.3664 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.12111 720.00 oh 0.36638 0.24527 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355
1.2.2. OPERASIONAL KANTOR LAPANGAN
1 Membuat dan membongkar direksi keet, los kerja, dan guda m2 108.00 0.06556 0.0177 0.0177 0.05914 108.00 m2 0.0656 0.0064 0.05463 108.00 m2 0.06556 0.01093
2 Papan nama pekerjaan m2 4.00 0.00370 0.0040 0.00401 4.00 m2 0.0037 - 0.00031 - 0.00031 0.00370 4.00 m2 0.00370 -
3 Operasional direksikeet set 1.00 0.03212 0.0348 0.02608 1.00 set 0.0321 0.0060 0.03212 1.00 set 0.03212 -

1.3. MOBILISASI DAN DEMOBILISASI


1.3.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
1 Mobilisasi dan demobilisasi Peralatan Berat pkt 1.00 0.12850 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.06954 1.00 pkt 0.1285 0.0590 0.0642 1.00 pkt 0.12850 0.06425
2 Perbaikan jalan akses masyarakat m2 3,920.00 0.76212 - 3,920.00 m2 0.7621 0.7621 - 3,600.00 m2 0.69991 0.69991
3. Relokasi tiang PLN ttk 14.00 0.19132 14.00 ttk 0.1913 0.1913 0.0957 0.0957 0.1913 14.00 ttk 0.19132 -
JALUR DAN BANGUNAN
2.1. SIPIL
2.1.1 Pekerjaan Persiapan
1 Pembersihan lapangan dan perataan m2 71,138.20 0.26509 0.0465 0.0465 0.0465 0.28694 71,138.20 m2 0.2651 - 0.0218 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 0.26509 71138.2008 m2 0.26509 -
2 Pembongkaran bangunan m2 1,920.00 0.65899 1,920.00 m2 0.6590 0.6590 0.16475 0.16475 0.16475 0.16475 0.65899 1920.00 m2 0.65899 -
2.1.2. PERBAIKAN TANAH DASAR
1 Perkuatan dengan geotekstile m2 12,500.00 3.83249 0.1106 0.1106 0.1106 - 12,500.00 m2 3.8325 3.8325 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 2.91269 12,500.00 m2 3.83249 0.91980

2.1.2. KONSTRUKSI TUBUH BAAN


1 Stripping / pengupasan lapisan tanah dasar mak 50cm m2 37,946.70 0.71191 0.0197 0.0197 0.0197 0.56679 37,946.70 m2 0.7119 0.1451 0.1451 0.52363 27,910.93 m2 0.52363 -
2 Timbunan dengan material tanah pilihan m3 154,783.87 20.96365 0.30599 0.30599 0.30599 0.51310 154,783.87 m3 20.9637 20.4506 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 13.58909 155,308.556 m3 21.03472 7.44562
70
3 Timbunan dengan sirtu (sub balas) m3 8,214.25 1.46401 - 8,214.25 m3 1.4640 1.4640 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 - 8,214.25 m3 1.46401 1.46401
4 Galian tanah dengan alat berat m3 31,751.49 1.85642 0.2325 0.2325 0.2325 0.07229 31,751.49 m3 1.8564 1.7841 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.92255 36,035.35 m3 2.10688 1.18434
5 Membuang Tanah sejauh 30 m m3 31,751.49 0.70993 0.0889 0.0889 0.0889 0.01075 31,751.49 m3 0.7099 0.6992 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.34888 36,035.35 m3 0.80571 0.45683

2.1.2. DRAINASE
1 Drainase beton pracetak 80x80 cm tebal 10 cm m' 3,362.40 7.39092 - 3,362.40 m' 7.3909 7.3909 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 - 3,351.00 m' 7.36586 7.36586 - -

2 Retaining wall
Galian Tanah m3 15,287.04 0.89379 - 15,287.04 m3 0.8938 0.8938 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.27922 15,004.76 m3 0.87729 0.59807 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120
Pasangan batu kosong m3 1,488.54 0.55260 - 1,488.54 m3 0.5526 0.5526 0.0089 0.0089 0.0089 0.0089 0.0089 0.0089 0.31404 1,436.76 m3 0.53337 0.21933 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m2 744.27 0.84449 - 744.27 m2 0.8445 0.8445 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.43022 718.38 m2 0.81511 0.38488 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069
Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 m3 9,930.52 12.16727 - 9,930.52 m3 12.1673 12.1673 0.1962 0.1962 0.1962 0.1962 0.1962 0.1962 3.15151 9,520.03 m3 11.66433 8.51281 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520
Pembesian dengan besi ulir m3 830,160.18 14.82782 - 830,160.18 m3 14.8278 14.8278 0.2392 0.2392 0.2392 0.2392 0.2392 0.2392 6.32121 809,155.34 kg 14.45265 8.13144 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452
Urugan pasir m3 744.27 0.16325 - 744.27 m3 0.1633 0.1633 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.08317 718.38 m3 0.15758 0.07441 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
Bekisting m2 21,675.20 10.92931 - 21,675.20 m2 10.9293 10.9293 0.1763 0.1763 0.1763 0.1763 0.1763 0.1763 2.43521 20,652.24 m2 10.41350 7.97829 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425

2.2 JALAN REL


2.2.1. MATERIAL JALAN KA
1 Angkutan rel ton 324.00 0.37354 - 324.00 ton 0.3735 0.3735 - 324.00 ton 0.37354 0.37354
2 Bantalan Kayu untuk MJ lengkap dengan aksesoris ttk 40.00 0.50863 - 40.00 ttk 0.5086 0.5086 - 40.00 ttk 0.50863 0.50863

3 Ecer Bantalan Beton Beserta alat penambat btg 4,834.00 0.23169 - 4,834.00 btg 0.2317 0.2317 - 4834.00 btg 0.23169 0.23169
4 Angkutan Bantalan Beton Lengkap Dengan Alat Penambat Elastis /btg btg 4,834.00 0.37084

2.2.2. KONSTRUKSI JALAN KA


1 Pengadaan dan pengeceran balas m3 4,785.00 2.1631 - 4,785.00 m3 2.1631 2.1631 - 4785.00 m3 2.16311 2.16311

2 Pemasangan track R.54 dengan pemecokan awal m'sp 2,900.00 0.8657 - 2,900.00 m'sp 0.8657 0.8657 - 2900.00 m'sp 0.86566 0.86566
3 MTT msp 2,900.00 0.4923 - 2,900.00 msp 0.4923 0.4923 - 2900.00 msp 0.49227 0.49227
4 PBR msp 2,900.00 0.0261 - 2,900.00 msp 0.0261 0.0261 - 2900.00 msp 0.02609 0.02609
5 Pengelasan flash butt R.54 titik 192.00 0.8512 - 192.00 titik 0.8512 0.8512 - 192.00 titik 0.85118 0.85118

2.3. PENDUKUNG JALUR DAN BANGUNAN


50
2.3.1. PAPAN INFORMASI KONSTRUKSI
1 Patok KM-HM buah 30.00 0.0327 - 30.00 buah 0.0327 0.0327 - 30.00 buah 0.03266 0.03266
2 Tanda-tanda lintas set 1.00 0.0017 - 1.00 set 0.0017 0.0017 - 1.00 set 0.00175 0.00175
50
3 Pemasangan pagar sterilisasi panel beton t=120 cm m' 3,000.00 4.5111 - 3,000.00 m' 4.5111 4.5111 0.09398 0.09398 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 4.51110 3,000.00 m' 4.51110 -

2.7. JEMBATAN

1 Underpass akses masyarakat uk. 6x5,5 (2 unit)


2 Box Culvert uk. 4x4 (1 unit)
3 Jembatan Perlintasan Jalan Nasional
1. 'PEKERJAAN PONDASI
2. PEKERJAAN ABUTMEN
3. 'PEKERJAAN DECK
4. 'I GIRDER
5. 'BEARING
6. 'EXPANSION JOINT

Box Culvert uk. 1x1 (2 unit)


Galian Tanah m3 84.49 0.0049 - 84.49 m3 0.00494 0.00494 0.00247 0.00247
Pasangan batu kosong m3 10.49 0.0039 - 6.60 m3 0.00245 0.00245 0.00245
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.20 0.0070 - 3.30 m3 0.00374 0.00374 0.00374
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 45.66 0.0628 - 80.48 m3 0.11073 0.11073 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384
Pembesian dengan besi ulir kg 5,447.89 0.0973 - 7,034.97 kg 0.12565 0.12565 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571
Urugan pasir m3 6.20 0.0014 - 3.30 m3 0.00072 0.00072 0.00072
Structural Backfill m3 64.35 0.0071 - 64.35 m3 0.00710 0.00710 0.00355 0.00355
Bekisting m2 237.96 0.1200 - 347.64 m2 0.17529 0.17529 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191

Box Culvert Uk. 2x2 (12 unit)


Galian Tanah m3 2,413.94 0.1411 - 2,488.42 m3 0.14549 0.14549 0.03637 0.03637 0.03637 0.03637
Pasangan batu kosong m3 138.68 0.0515 - 126.10 m3 0.04681 0.04681 0.00585 0.00585 0.00585 0.00585 0.00585 0.00585
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 69.34 0.0787 - 63.05 m3 0.07154 0.07154 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 856.70 1.1787 - 1,148.23 m3 1.57978 1.57978 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319
Pembesian dengan besi ulir kg 119,199.98 2.1291 - 124,190.18 kg 2.21821 2.21821 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873
Urugan pasir m3 69.34 0.0152 - 63.05 m3 0.01383 0.01383 0.00173 0.00173 0.00173 0.00173 0.00173 0.00173
Structural Backfill m3 1,052.25 0.1161 REALISASI MINGGUAN - 1,109.44 m3 0.12246 0.12246
Bekisting m2 3,432.11 1.7306 - 4,315.16 m2 2.17584 2.17584 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703

Underpass Warga 4x4 (1 unit)


Galian Tanah m3 158.08 0.0092 - 158.08 m3 0.00924 0.00924
Pasangan batu kosong m3 12.74 0.0047 - 12.74 m3 0.00473 0.00473
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.37 0.0072 - 6.37 m3 0.00723 0.00723
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 126.99 0.1747 - 166.19 m3 0.22865 0.22865
Pembesian dengan besi ulir kg 18,079.49 0.3229 - 19,806.47 kg 0.35377 0.35377
Urugan pasir m3 6.37 0.0014 - 6.37 m3 0.00140 0.00140
Structural Backfill m3 200.85 0.0222 - 200.85 m3 0.02217 0.02217
Bekisting m2 388.05 0.1957 - 493.07 m2 0.24862 0.24862

Box Culvert Uk. 4x4x2 (1 unit)


Galian Tanah m3 420.86 0.0246 - 420.86 m3 0.02461 0.02461
Pasangan batu kosong m3 40.48 0.0150 - 40.48 m3 0.01503 0.01503
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 20.24 0.0230 - 20.24 m3 0.02297 0.02297
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 323.26 0.4448 - 346.40 m3 0.47660 0.47660
Pembesian dengan besi ulir kg 37,808.67 0.6753 - 38,738.53 kg 0.69192 0.69192
Urugan pasir m3 20.24 0.0044 - 20.24 m3 0.00444 0.00444
Structural Backfill m3 339.90 0.0375 - 339.90 m3 0.03752 0.03752
Bekisting m2 812.61 0.4097 - 1,005.77 m2 0.50714 0.50714

Box Culvert Uk. 6x4x2 (1 unit)


Galian Tanah m3 367.08 0.0215 - 138.15 m3 0.00808 0.00808
Pasangan batu kosong m3 19.88 0.0074 - 34.08 m3 0.01265 0.01265
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 9.94 0.0113 RENCANA MINGGUAN - 17.04 m3 0.01933 0.01933
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 205.10 0.2822 - 352.28 m3 0.48468 0.48468
Pembesian dengan besi ulir kg 26,062.73 0.4655 - 23,923.23 kg 0.42730 0.42730
Urugan pasir m3 9.94 0.0022 - 17.04 m3 0.00374 0.00374
Structural Backfill m3 108.15 0.0119 - 185.40 m3 0.02046 0.02046
Bekisting m2 638.47 0.3219 - 1,071.23 m2 0.54015 0.54015

1. Bobok Beton m3 54.00 0.0328

100.0000

BOBOT RENCANA MINGGUAN : 0.10408 0.13485 0.08233 0.08233 0.01766 0.01766 0.01766 0.01766 0.80689 0.80689 0.80689 BOBOT S/D MGG 11 KONTRAK 90.33051 88.62395 0.77159 0.62677 0.62677 0.62677 0.55768 0.55768 0.46038 0.61368 0.61641 0.61641 0.64756 0.64756 0.77945 0.77945 0.87343 0.87352 0.87352 1.52479 1.52479 1.52479 1.52479 1.52479 1.52479 BOBOT S/D MGG 100.00000 62.48267 0.47096 0.47096 0.47096 0.47096 0.47096 0.47096 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.47171 0.47489 0.52445 0.52070 0.52070 0.52070 0.52070 0.52070 0.52070 0.52425 0.76081 0.75726 0.75726 0.75726 0.72089 0.72089
2.05980 34 KONTRAK ADD 40.05563
BOBOT KOMULATIF RENCANA MINGGUAN : 0.00000 0.10408 0.23893 0.32127 0.40360 0.42126 0.43892 0.45657 0.47423 1.28112 2.08800 2.89489 2.05980 2.83139 3.45815 4.08492 4.71169 5.26937 5.82705 6.28743 6.90111 7.51752 8.13393 8.78149 9.42904 10.20849 10.98795 11.86138 12.73490 13.60842 15.13320 16.65799 18.18278 19.70756 21.23235 22.75714 1 37.51733 37.98828 38.45924 38.93020 39.40115 39.87211 40.34307 40.81231 41.28155 41.75080 42.22004 42.68929 43.15853 43.62777 44.09702 44.56626 45.03797 45.51286 46.03731 46.55801 47.07871 47.59941 48.12012 48.64082 49.16152 49.68578 50.44659 51.20385 51.96111 52.71837 53.43925 54.16014

BOBOT REALISASI MINGGUAN : 0 0.00000 0.00089 0.00445 0.00289 0.02451 0.08435 0.10977 0.93832 0.19340 0.17848 0.52273 BOBOT S/D MGG 11 ADEDNDUM 14.72893 9.14805 4.14984 0.60500 0.224118367 0.004245882 0.0042460879 0.1142995229 0.2389351383 0.17170 0.0059133922 0.0042502292 0.0962884709 0.1480664149 0.1067039507 0.17744 0.90731 1.31701 1.30047 1.53812 1.00613 2.02172 0.00425 BOBOT S/D MGG 1.23430 2.42714 1.61500 1.61087 1.50734 0.87979 0.00398 0.00398 1.68580 1.14925 0.59724 0.59723 1.63629 1.88968 2.32309 1.86242 0.96559 0.96972 0.09164 0.00976 0.72043 0.74694 0.61818 0.65034 0.61818 0.61973 1.16108 1.23422 0.62065 0.61818 0.61818
2.03259 34 ADEDNDUM 2 37.51733
BOBOT KOMULATIF REALISASI MINGGUAN : 0 0.00000 0.00089 0.00535 0.00824 0.03275 0.11710 0.22687 1.16519 1.35859 1.53707 2.05980 2.03259 16.76152 16.76152 25.90957 30.05941 30.66441 30.88853 30.89277 30.89702 31.01132 31.25025 31.42195 31.42786 31.43211 31.52840 31.67647 31.78317 31.96062 32.86793 34.18494 35.48541 37.02353 38.02966 40.05138 40.05563 37.517327486 38.75163 41.17876 42.79377 44.40464 45.91198 46.79177 46.79574 46.79973 48.48553 49.63478 50.23201 50.82925 52.46554 54.35521 56.67831 58.54073 59.50632 60.47604 60.56768 60.57744 61.29787 62.04481 62.66299 63.31332 63.93150 64.55124 65.71232 66.94653 67.56718 68.18536 68.80352

DEVIASI : -0.10408 -0.23804 -0.31592 -0.39536 -0.38850 -0.32182 -0.22970 0.69096 0.07748 -0.55093 -0.83509 DEVIASI 0.02721 13.93013 22.45141 25.97449 25.95272 25.61916 25.06572 24.60959 24.11021 23.73273 23.28802 22.64638 22.00307 21.31991 20.68852 19.92179 19.22572 19.25951 19.05173 18.82742 18.84075 18.32209 18.81903 17.29849 DEVIASI 2.53830 0.76333 2.71951 3.86357 5.00349 6.03987 6.44871 5.98344 5.51818 6.73473 7.41474 7.54273 7.67072 8.83777 10.25820 12.11205 13.50276 13.99346 14.43873 14.00967 13.49873 13.69846 13.92469 14.02217 14.15180 14.24572 14.10465 14.50847 14.98543 14.84881 14.74610 14.64339

Mengetahui Disetujui Oleh


BALAI TEKNIK PERKERETAAPIAN KONSULTAN SUPERVISI
KELAS II WILAYAH SUMATERA BAGIAN UTARA PT. HARAWANA CONSULTANT
PEJABAT PEMBUAT KOMITMEN ACEH WILAYAH II

Rangga Perdana Aminsaputra John F Sitompul, ST


NIP. 19931222 201801 1 002 Team Leader
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

WAKTU PELAKSANAAN
MINGGU 66 MINGGU 67 MINGGU 68 MINGGU 69 MINGGU 70 MINGGU 71 MINGGU 72 MINGGU 73 MINGGU 74 MINGGU 75 MINGGU 76 MINGGU 77 MINGGU 78 MINGGU 79 MINGGU 80 MINGGU 81 MINGGU 82 MINGGU 83 MINGGU 84 ADD KONTRAK BOBOT MINGGU 85 MINGGU 86 MINGGU 87 MINGGU 88 MINGGU 89 MINGGU 90 MINGGU 91 MINGGU 92 MINGGU 93 MINGGU 94 MINGGU 95 MINGGU 96 MINGGU 97 MINGGU 98 MINGGU 99 ADD KONTRAK BOBOT MINGGU 100 MINGGU 101 MINGGU 102 MINGGU 103 MINGGU 104 MINGGU 105 MINGGU 106 MINGGU 107 MINGGU 108 MINGGU 109 MINGGU 110 MINGGU 111 MINGGU 112 MINGGU 113 ADD KONTRAK BOBOT MINGGU 114 MINGGU 115 MINGGU 116 MINGGU 117 MINGGU 118 ADD KONTRAK BOBOT MINGGU 119 MINGGU 120 MINGGU 121 MINGGU 122 MINGGU 123 MINGGU 124 MINGGU 125 MINGGU 126 MINGGU 127 MINGGU 128 MINGGU 129 MINGGU 130 MINGGU 131 MINGGU 132 MINGGU 133
REALISASI
REALISASI S.D REALISASI S.D REALISASI S.D
03/12/2018 10/12/2018 17/12/2018 24/12/2018 31/12/2018 07/01/2019 14/01/2019 21/01/2019 28/01/2019 04/02/2019 11/02/2019 18/02/2019 25/02/2019 04/03/2019 11/03/2019 18/03/2019 25/03/2019 01/04/2019 08/04/2019 VOLUME ACTUAL 15/04/2019 22/04/2019 29/04/2019 06/05/2019 13/05/2019 20/05/2019 27/05/2019 03/06/2019 10/06/2019 17/06/2019 24/06/2019 01/07/2019 08/07/2019 15/07/2019 22/07/2019 VOLUME ACTUAL 29/07/2019 05/08/2019 12/08/2019 19/08/2019 26/08/2019 02/09/2019 09/09/2019 16/09/2019 23/09/2019 30/09/2019 07/10/2019 14/10/2019 21/10/2019 28/10/2019 VOLUME ACTUAL 04/11/2019 11/11/2019 18/11/2019 25/11/2019 02/12/2019 S.D MINGGU VOLUME ACTUAL 09/12/2019 16/12/2019 23/12/2019 30/12/2019 06/01/2020 13/01/2020 20/01/2020 27/01/2020 03/02/2020 10/02/2020 17/02/2020 24/02/2020 02/03/2020 09/03/2020 16/03/2020
MINGGU 84 SISA MINGGU 99 SISA MINGGU 113 SISA SISA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d 118 VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
09/12/2018 16/12/2018 23/12/2018 30/12/2018 06/01/2019 13/01/2019 20/01/2019 27/01/2019 03/02/2019 10/02/2019 17/02/2019 24/02/2019 03/03/2019 10/03/2019 17/03/2019 24/03/2019 31/03/2019 07/04/2019 14/04/2019 21/04/2019 28/04/2019 05/05/2019 12/05/2019 19/05/2019 26/05/2019 02/06/2019 09/06/2019 16/06/2019 23/06/2019 30/06/2019 07/07/2019 14/07/2019 21/07/2019 28/07/2019 04/08/2019 11/08/2019 18/08/2019 25/08/2019 01/09/2019 08/09/2019 15/09/2019 22/09/2019 29/09/2019 06/10/2019 13/10/2019 20/10/2019 27/10/2019 03/11/2019 10/11/2019 17/11/2019 24/11/2019 01/12/2019 08/12/2019 15/12/2019 22/12/2019 29/12/2019 05/01/2020 12/01/2020 19/01/2020 26/01/2020 02/02/2020 09/02/2020 16/02/2020 23/02/2020 01/03/2020 08/03/2020 15/03/2020 22/03/2020

0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.25443 90,000.00 m2 0.25443 - - - 0.254 90,000.00 m2 0.254 - 0.269 90,000.00 m2 0.269 0.26863 90,000.00 m2 0.26863 -
0.03212 2.00 set 0.06425 0.03212 0.032 2.00 set 0.064 0.032 0.034 2.00 set 0.068 0.034 0.03392 2.00 set 0.06784 0.03392
-
0.00385 30.00 ttk 0.00385 - 0.004 30.00 ttk 0.004 - 0.004 30.00 ttk 0.004 - 0.00407 30.00 ttk 0.00407 -
0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.05031 445.00 ttk 0.08577 0.03547 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.060 445.00 ttk 0.086 0.026 0.009 0.009 0.009 0.080 445.00 ttk 0.091 0.010 0.010 0.09056 445.00 ttk 0.09056 -
- ttk 0.02120 0.02120 - - 0.0053 0.0053 0.0053 0.0053 0.004 60.00 ttk 0.021 0.018 0.004 58.00 ttk 0.022 0.018 0.009 0.009 0.01119 58.00 ttk 0.02164 0.01045 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037
0.00514 6.00 ttk 0.01542 0.01028 0.00514 0.00514 0.005 6.00 ttk 0.015 0.010 0.005 0.005 0.011 4.00 ttk 0.011 - 0.01085 4.00 ttk 0.01085 -
0.02409 10.00 ttk 0.02409 - 0.024 10.00 ttk 0.024 - 0.025 10.00 ttk 0.025 - 0.02544 10.00 ttk 0.02544 -

0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.03466 24.00 bln 0.04626 0.01160 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.041 24.00 bln 0.046 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.049 24.00 bln 0.049 - 0.04884 24.00 bln 0.04884 -
0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.29921 720.00 oh 0.36638 0.06717 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.353 720.00 oh 0.366 0.014 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.387 720.00 oh 0.387 - 0.38683 720.00 oh 0.38683 -

0.05463 108.00 m2 0.06556 0.01093 0.055 108.00 m2 0.066 0.011 0.058 108.00 m2 0.069 0.012 0.05768 108.00 m2 0.06922 0.01154
0.00370 4.00 m2 0.00370 - 0.004 4.00 m2 0.004 - 0.004 4.00 m2 0.004 - 0.00391 4.00 m2 0.00391 -
0.03212 1.00 set 0.03212 - 0.032 1.00 set 0.032 - 0.034 1.00 set 0.034 - 0.03392 1.00 set 0.03392 -

0.06425 1.00 pkt 0.12850 0.06425 0.064 1.00 pkt 0.128 0.064 0.068 1.00 pkt 0.136 0.068 0.06784 1.00 pkt 0.13567 0.06784
- 3,920.00 m2 0.76212 0.76212 - 3,920.00 m2 0.762 0.762 - 3,920.00 m2 0.805 0.805 0.80467 3,920.00 m2 0.80467 -
0.19132 14.00 ttk 0.19132 - 0.191 14.00 ttk 0.191 - 0.202 14.00 ttk 0.202 - 0.20200 14.00 ttk 0.20200 -

0.26509 71,138.20 m2 0.26509 - 0.265 71,138.20 m2 0.265 - 0.280 71,138.20 m2 0.280 - 0.27989 71,138.20 m2 0.27989 -
0.65899 1,920.00 m2 0.65899 - 0.659 1,920.00 m2 0.659 - 0.696 1,920.00 m2 0.696 - 0.69577 1,920.00 m2 0.69577 -

0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 3.83249 12,500.00 m2 3.83249 - 3.832 12,500.00 m2 3.832 - 4.046 12,500.00 m2 4.046 - 4.04643 12,500.00 m2 4.04643 -

0.52363 37,946.70 m2 0.71191 0.18828 0.03766 0.03766 0.03766 0.03766 0.03766 0.712 37,946.70 m2 0.712 - 0.752 37,946.70 m2 0.752 - 0.75165 37,946.70 m2 0.75165 -
0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 18.89775 154,783.87 m3 20.96365 2.06590 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 18.898 154,783.87 m3 20.964 2.066 0.258 0.258 0.258 0.258 0.258 0.258 0.258 21.164 154,783.87 m3 22.134 0.970 0.323 0.323 0.323 22.03483 154,783.87 m3 22.13390 0.09906 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
- 8,214.25 m3 1.46401 1.46401 0.4880 0.4880 0.4880 0.878 8,214.25 m3 1.464 0.586 0.146 0.146 0.927 7,413.95 m3 1.395 0.468 0.117 0.117 0.117 0.117 0.97449 7,413.95 m3 1.39514 0.42065 0.032 0.032 0.032
0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 1.81417 31,751.49 m3 1.85642 0.04225 0.0070 0.0070 0.0070 0.0070 0.0070 0.0070 1.856 31,751.49 m3 1.856 - 1.960 31,751.49 m3 1.960 - 1.96005 31,751.49 m3 1.96005 -
0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.68985 31,751.49 m3 0.70993 0.02008 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.710 31,751.49 m3 0.710 - 0.750 31,751.49 m3 0.750 - 0.74956 31,751.49 m3 0.74956 -

0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 5.61595 3,362.40 m' 7.39092 1.77497 0.8875 0.8875 6.606 3,362.40 m' 7.391 0.785 7.439 3,362.40 m' 7.803 0.365 0.091 0.091 0.091 0.091 7.57142 3,362.40 m' 7.80350 0.23208

0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.78240 15,287.04 m3 0.89379 0.11139 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.894 15,287.04 m3 0.894 - 0.944 15,287.04 m3 0.944 - 0.94368 15,287.04 m3 0.94368 -
0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.40428 1,488.54 m3 0.55260 0.14832 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.492 1,488.54 m3 0.553 0.061 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.583 1,488.54 m3 0.583 - 0.58344 1,488.54 m3 0.58344 -
0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.69951 744.27 m2 0.84449 0.14497 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.833 744.27 m2 0.844 0.012 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.892 744.27 m2 0.892 - 0.89163 744.27 m2 0.89163 -
0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 8.79320 9,930.52 m3 12.16727 3.37407 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 10.640 9,930.52 m3 12.167 1.527 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 12.846 9,930.52 m3 12.846 - 12.84648 9,930.52 m3 12.84648 -
0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 13.12466 830,160.18 kg 14.82782 1.70316 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 14.766 830,160.18 kg 14.828 0.062 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 15.656 830,160.18 kg 15.656 - 15.65555 830,160.18 kg 15.65555 -
0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.11943 744.27 m3 0.16325 0.04382 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.161 744.27 m3 0.163 0.002 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.172 744.27 m3 0.172 - 0.17237 744.27 m3 0.17237 -
0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 7.92599 21,675.20 m2 10.92931 3.00332 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.4378 0.1565 0.15651 9.648 21,675.20 m2 10.929 1.281 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 11.539 21,675.20 m2 11.539 - 11.53941 21,675.20 m2 11.53941 -

- 324.00 ton 0.37354 0.37354 0.18677 - 324.00 ton 0.374 0.374 - 324.00 ton 0.394 0.394 0.054 - 324.00 ton 0.39439 0.39439
- 40.00 ttk 0.50863 0.50863 0.25431 - 40.00 ttk 0.509 0.509 - - ttk 0.000 - - ttk - -
- 4,834.00 btg 0.23169 0.23169 0.11585 - 4,834.00 btg 0.232 0.232 - - btg 0.000 - - btg - -
- 4,834.00 btg 0.37084 0.37084 0.18542 - 4,834.00 btg 0.371 0.371 - 4,834.00 btg 0.392 0.392 0.131 0.131 0.131 - 4,834.00 btg 0.39154 0.39154

- 4,785.00 m3 2.16311 2.16311 0.54078 - 4,785.00 m3 2.163 2.163 - - m3 0.000 - - m3 - -


- 2,900.00 m'sp 0.86566 0.86566 - 2,900.00 m'sp 0.866 0.866 - - m'sp 0.000 - - m'sp - -
- 2,900.00 msp 0.49227 0.49227 - 2,900.00 msp 0.492 0.492 - - msp 0.000 - - msp - -
- 2,900.00 msp 0.02609 0.02609 - 2,900.00 msp 0.026 0.026 - - msp 0.000 - - msp - -
- 192.00 titik 0.85118 0.85118 - 192.00 titik 0.851 0.851 - - titik 0.000 - - titik - -

- 30.00 buah 0.03266 0.03266 - 30.00 buah 0.033 0.033 - 30.00 buah 0.034 0.034 - 30.00 buah 0.03449 0.03449
- 1.00 set 0.00175 0.00175 - 1.00 set 0.002 0.002 - 1.00 set 0.002 0.002 - 1.00 set 0.00184 0.00184
4.51110 3,000.00 m' 4.51110 - 4.511 3,000.00 m' 4.511 - 4.763 3,000.00 m' 4.763 - 4.76292 3,000.00 m' 4.76292 -

0.00269 84.49 m3 0.00494 0.00225 0.00225 0.005 84.49 m3 0.005 - 0.005 84.49 m3 0.005 - 0.00522 84.49 m3 0.00522 -
0.00134 10.49 m3 0.00389 0.00256 0.00256 0.004 10.49 m3 0.004 - 0.004 10.49 m3 0.004 - 0.00411 10.49 m3 0.00411 -
0.00204 6.20 m3 0.00704 0.00500 0.00500 0.007 6.20 m3 0.007 - 0.007 6.20 m3 0.007 - 0.00743 6.20 m3 0.00743 -
0.05269 45.66 m3 0.06282 0.01012 0.00506 0.00506 0.063 45.66 m3 0.063 - 0.066 45.66 m3 0.066 - 0.06632 45.66 m3 0.06632 -
0.06301 5,447.89 kg 0.09731 0.03430 0.01715 0.01715 0.097 5,447.89 kg 0.097 - 0.103 5,447.89 kg 0.103 - 0.10274 5,447.89 kg 0.10274 -
0.00039 6.20 m3 0.00136 0.00097 0.00097 0.001 6.20 m3 0.001 - 0.001 6.20 m3 0.001 - 0.00144 6.20 m3 0.00144 -
0.00387 64.35 m3 0.00710 0.00323 0.00323 0.007 64.35 m3 0.007 - 0.007 64.35 m3 0.007 - 0.00750 64.35 m3 0.00750 -
0.08514 237.96 m2 0.11999 0.03484 0.01742 0.01742 0.120 237.96 m2 0.120 - 0.127 237.96 m2 0.127 - 0.12668 237.96 m2 0.12668 -

0.11408 2,413.94 m3 0.14114 0.02705 0.02705 0.141 2,413.94 m3 0.141 - 0.149 2,413.94 m3 0.149 - 0.14901 2,413.94 m3 0.14901 -
0.00585 0.00585 0.04139 138.68 m3 0.05148 0.01010 0.01010 0.051 138.68 m3 0.051 - 0.054 138.68 m3 0.054 - 0.05436 138.68 m3 0.05436 -
0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.06325 69.34 m3 0.07868 0.01543 0.01543 0.079 69.34 m3 0.079 - 0.083 69.34 m3 0.083 - 0.08307 69.34 m3 0.08307 -
0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.94574 856.70 m3 1.17868 0.23294 0.11647 0.11647 1.179 856.70 m3 1.179 - 1.244 856.70 m3 1.244 - 1.24447 856.70 m3 1.24447 -
0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 1.71452 119,199.98 kg 2.12908 0.41456 0.20728 0.20728 2.129 119,199.98 kg 2.129 - 2.248 119,199.98 kg 2.248 - 2.24793 119,199.98 kg 2.24793 -
0.00173 0.00173 0.01223 69.34 m3 0.01521 0.00298 0.00298 0.015 69.34 m3 0.015 - 0.016 69.34 m3 0.016 - 0.01606 69.34 m3 0.01606 -
0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.09393 1,052.25 m3 0.11615 0.02222 0.02222 0.116 1,052.25 m3 0.116 - 0.123 1,052.25 m3 0.123 - 0.12263 1,052.25 m3 0.12263 -
0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 1.38546 3,432.11 m2 1.73058 0.34512 0.17256 0.17256 1.731 3,432.11 m2 1.731 - 1.827 3,432.11 m2 1.827 - 1.82718 3,432.11 m2 1.82718 -

0.00462 0.00462 0.00924 158.08 m3 0.00924 - 0.009 158.08 m3 0.009 - 0.010 158.08 m3 0.010 - 0.00976 158.08 m3 0.00976 -
0.00236 0.00236 0.00473 12.74 m3 0.00473 - 0.005 12.74 m3 0.005 - 0.005 12.74 m3 0.005 - 0.00499 12.74 m3 0.00499 -
0.00361 0.00361 0.00723 6.37 m3 0.00723 - 0.007 6.37 m3 0.007 - 0.008 6.37 m3 0.008 - 0.00763 6.37 m3 0.00763 -
0.05716 0.05716 0.05716 0.05716 0.17471 126.99 m3 0.17471 - 0.175 126.99 m3 0.175 - 0.184 126.99 m3 0.184 - 0.18447 126.99 m3 0.18447 -
0.08844 0.08844 0.08844 0.08844 0.32292 18,079.49 kg 0.32292 - 0.323 18,079.49 kg 0.323 - 0.341 18,079.49 kg 0.341 - 0.34095 18,079.49 kg 0.34095 -
0.00070 0.00070 0.00140 6.37 m3 0.00140 - 0.001 6.37 m3 0.001 - 0.001 6.37 m3 0.001 - 0.00148 6.37 m3 0.00148 -
0.00739 0.00739 0.00739 0.02217 200.85 m3 0.02217 - - 0.022 200.85 m3 0.022 - 0.023 200.85 m3 0.023 - 0.02341 200.85 m3 0.02341 -
0.06215 0.06215 0.06215 0.06215 0.19567 388.05 m2 0.19567 - 0.196 388.05 m2 0.196 - 0.207 388.05 m2 0.207 - 0.20659 388.05 m2 0.20659 -

0.01230 0.01230 - 420.86 m3 0.02461 0.02461 0.02461 - 420.86 m3 0.025 0.025 0.025 0.026 420.86 m3 0.026 - 0.02598 420.86 m3 0.02598 -
0.00751 0.00751 - 40.48 m3 0.01503 0.01503 0.01503 - 40.48 m3 0.015 0.015 0.015 0.016 40.48 m3 0.016 - 0.01587 40.48 m3 0.01587 -
0.01148 0.01148 - 20.24 m3 0.02297 0.02297 0.02297 - 20.24 m3 0.023 0.023 0.023 0.024 20.24 m3 0.024 - 0.02425 20.24 m3 0.02425 -
0.11915 0.11915 0.11915 0.11915 - 323.26 m3 0.44476 0.44476 0.22238 0.22238 - 323.26 m3 0.445 0.445 0.111 0.111 0.111 0.111 0.470 323.26 m3 0.470 - 0.46958 323.26 m3 0.46958 -
0.17298 0.17298 0.17298 0.17298 - 37,808.67 kg 0.67532 0.67532 0.49283 0.18249 - 37,808.67 kg 0.675 0.675 0.169 0.169 0.169 0.169 0.713 37,808.67 kg 0.713 - 0.71301 37,808.67 kg 0.71301 -
0.00222 0.00222 - 20.24 m3 0.00444 0.00444 0.00444 - 20.24 m3 0.004 0.004 0.004 0.005 20.24 m3 0.005 - 0.00469 20.24 m3 0.00469 -
0.01251 0.01251 0.01251 - 339.90 m3 0.03752 0.03752 0.03752 - 339.90 m3 0.038 0.038 0.038 0.040 339.90 m3 0.040 - 0.03961 339.90 m3 0.03961 -
0.12679 0.12679 0.12679 0.12679 - 812.61 m2 0.40975 0.40975 0.20487 0.20487 - 812.61 m2 0.410 0.410 0.137 0.137 0.137 0.433 812.61 m2 0.433 - 0.43262 812.61 m2 0.43262 -

0.00404 0.00404 - 367.08 m3 0.02146 0.02146 0.02146 0.021 367.08 m3 0.021 - 0.023 367.08 m3 0.023 - 0.02266 367.08 m3 0.02266 -
0.00633 0.00633 - 19.88 m3 0.00738 0.00738 0.00738 0.007 19.88 m3 0.007 - 0.008 19.88 m3 0.008 - 0.00779 19.88 m3 0.00779 -
0.00967 0.00967 - 9.94 m3 0.01128 0.01128 0.01128 0.011 9.94 m3 0.011 - 0.012 9.94 m3 0.012 - 0.01191 9.94 m3 0.01191 -
0.12117 0.12117 0.12117 0.12117 - 205.10 m3 0.28219 0.28219 0.09406 0.09406 0.09406 0.282 205.10 m3 0.282 - 0.298 205.10 m3 0.298 - 0.29794 205.10 m3 0.29794 -
0.10683 0.10683 0.10683 0.10683 - 26,062.73 kg 0.46552 0.46552 0.15517 0.23611 0.07423 0.466 26,062.73 kg 0.466 - 0.492 26,062.73 kg 0.492 - 0.49150 26,062.73 kg 0.49150 -
0.00187 0.00187 - 9.94 m3 0.00218 0.00218 0.00218 0.002 9.94 m3 0.002 - 0.002 9.94 m3 0.002 - 0.00230 9.94 m3 0.00230 -
0.00682 0.00682 0.00682 - 108.15 m3 0.01194 0.01194 0.01194 0.012 108.15 m3 0.012 - 0.013 108.15 m3 0.013 - 0.01260 108.15 m3 0.01260 -
0.13504 0.13504 0.13504 0.13504 - 638.47 m2 0.32194 0.32194 0.16097 0.16097 0.322 638.47 m2 0.322 - 0.340 638.47 m2 0.340 - 0.33991 638.47 m2 0.33991 -

- 54.00 m3 0.03279 0.03279 0.03279 - 54.00 m3 0.033 0.033 0.016 0.016 0.035 54.00 m3 0.035 - 0.03462 54.00 m3 0.03462 -

0.72089 0.72857 1.29466 1.28697 1.29075 1.29075 1.10503 1.52803 1.50089 1.96666 1.96666 1.55998 1.93242 1.92018 1.91734 1.91734 1.55430 1.54748 1.54748 BOBOT S/D MGG 100.00000 24.97181 0.74118 0.74118 0.99581 0.99581 0.99581 1.59809 1.59000 0.00415 0.00415 1.37870 1.38336 2.77279 1.89635 2.17409 2.18006 BOBOT S/D MGG 100.000 14.909 0.216 0.216 0.211 0.211 0.211 0.211 0.228 0.494 0.545 0.895 0.886 0.886 0.933 0.616 BOBOT S/D MGG 100.000 3.57014 0.53125 0.53125 0.68090 0.34754 0.18406 BOBOT S/D 100.000 1.69779
84 KONTRAK ADD 75.02819 99 KONTRAK ADD 85.09150 113 KONTRAK 91.23928 MGG 118 98.20211
54.88103 55.60960 56.90426 58.19123 59.48198 60.77273 61.87776 63.40579 64.90668 66.87334 68.84000 70.39997 72.33239 74.25257 76.16990 78.08724 79.64154 81.18903 82.73651 3 75.02819 75.76937 76.51055 77.50636 78.50218 79.49799 81.09608 82.68608 82.69022 82.69437 84.07307 85.45643 88.22921 90.12556 92.29965 94.47971 3 85.091 85.30783 85.524 85.735 85.947 86.158 86.369 86.597 87.091 87.636 88.531 89.417 90.303 91.236 91.852 ADD 5 96.42986 96.96112 97.49237 98.17327 98.52081 98.70487 KONTRAK 98.30221
ADD 5
0.00647 0.00666 0.03382 0.00553 0.00554 0.00398 0.00398 0.00399 0.00399 0.00398 0.45119 1.65972 1.23218 1.56409 1.22361 0.00398 0.00399 0.00398 0.00398 BOBOT S/D MGG 0.41207 0.00400 0.00400 0.00398 0.00398 0.09723 0.00397 0.00397 0.00398 0.00398 0.14161 0.59304 0.60112 2.99945 5.1870 BOBOT S/D MGG 0.07994 0.02935 0.34105 0.10545 0.47819 1.38760 0.3290499963 1.19140 0.74016 1.29369 0.05269 0.03752 0.07449 0.00720 BOBOT S/D MGG 0.40787 0.47513 0.53053 0.36233 0.09648 BOBOT S/D
84 ADEDNDUM 3 75.02819 99 ADEDNDUM 3 85.09150 113 ADEDNDUM 6 96.42986 MGG 118 98.30221
68.81000 68.81666 68.85048 68.85600 68.86155 68.86553 68.86950 68.87349 68.87749 68.88147 69.33266 70.99237 72.22455 73.78864 75.01225 75.01624 75.02023 75.02421 75.02819 75.0282 75.44026 75.44426 75.44825 75.45224 75.45621 75.55343 75.55740 75.56136 75.56534 75.56932 75.71093 76.30397 76.90509 79.90454 85.09150 85.091 85.17144 85.20079 85.54184 85.64729 86.12548 87.51309 87.84214 89.03354 89.77369 91.06739 91.12007 91.15759 91.23208 91.23928 96.430 96.73764 97.21277 97.74330 98.10563 98.20211 ADEDNDUM 7 100.00000

13.92897 13.20706 11.94622 10.66477 9.37956 8.09279 6.99174 5.46770 3.97081 2.00813 0.49266 0.59240 (0.10784) (0.46393) (1.15766) (3.07100) (4.62131) (6.16482) (7.70832) DEVIASI (0.00000) (0.32911) (1.06629) (2.05811) (3.04994) (4.04179) (5.54265) (7.12868) (7.12887) (7.12903) (8.50375) (9.74550) (11.92524) (13.22048) (12.39511) (9.38821) DEVIASI - -0.13639 -0.32338 -0.19353 -0.29928 -0.03229 1.14412 1.24557 1.94253 2.13760 2.53665 1.70330 0.85478 -0.00410 -0.61274 DEVIASI (5.19059) -0.15675 -0.24623 -0.42997 -0.41518 -0.50276 DEVIASI (0.10010)

Aceh Tamiang, 27 Oktober 2019


Dibuat dan Dihitung Oleh
KONTRAKTOR PELAKSANA
PT. DWIFARITA FAJARKHARISMA

Basuki Setyawan, ST
Site Manager
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

KET
MINGGU 134 MINGGU 135 MINGGU 136 MINGGU 137 MINGGU 138 MINGGU 139 MINGGU 140 MINGGU 141 MINGGU 142 MINGGU 143 MINGGU 144 MINGGU 145 MINGGU 146 MINGGU 147 MINGGU 148 MINGGU 149 MINGGU 150 MINGGU 151 MINGGU 152
23/03/2020 30/03/2020 06/04/2020 13/04/2020 20/04/2020 27/04/2020 04/05/2020 11/05/2020 18/05/2020 25/05/2020 01/06/2020 08/06/2020 15/06/2020 22/06/2020 29/06/2020 06/07/2020 13/07/2020 20/07/2020 27/07/2020
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
29/03/2020 05/04/2020 12/04/2020 19/04/2020 26/04/2020 03/05/2020 10/05/2020 17/05/2020 24/05/2020 31/05/2020 07/06/2020 14/06/2020 21/06/2020 28/06/2020 05/07/2020 12/07/2020 19/07/2020 26/07/2020 31/07/2020

0.008 0.008 0.008 0.008

0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037 0.00037

0.002 0.002 0.002 0.002 0.002 0.002

0.034 0.034

0.005 0.005 0.005 0.005 0.005


0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032

0.170 0.170

0.034
0.002

0.18082 0.18082 0.08065 0.04432

98.88569 99.06652 99.14717 99.19149


\

\ BALAI TEKNIK PERKERETAAPIAN WILAYAH SUMATERA BAGIAN UTARA


LAPORAN MINGGUAN
LAPORAN FISIK KEMAJUAN PEKERJAAN
]
PEKERJAAN : PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG
PAKET : BSL - 10
KM.441 + 000 s.d KM. 444 + 000
PAKET : BSL - 10 RENCANA MINGGU KE :
KEMENTERIAN / : KEMENTERIAN PERHUBUNGAN 153 ( SERATUS LIMA PULUH TIGA )
INSTANSI DIREKTORAT JENDERAL PERKERETAAPIAN
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA TANGGAL
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA 03 Agustus 2020
NOMER KONTRAK : 10/SP/ SP- BSL/BTP-SBU/IX/2017 s.d
TANGGAL 04 September 2017 09 Agustus 2020
NOMER KONTRAK ADD 1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD 2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD 3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD 4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD 5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD 6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD 7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
cNOMER KONTRAK ADD 8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
cNOMER KONTRAK ADD 9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JANGKA WAKTU 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN : PT. HARAWANA CONSULTANT

Uraian Sub Output / Komponen REALISASI KONTRAK ADD 8 REALISASI SISA YANG BELUM
NO SATUAN VOLUME BOBOT % S/D MINGGU LALU S/D MINGGU LALU MINGGU INI S/D MINGGU INI DIKERJAKAN
Sub Komponen Detail VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
1 2 3 4 5 6 7 6 7 8 9 10 11 12 13
A. UMUM
1.1 DESAIN, SURVEI, DAN PERIJINAN
1.1.1. DESAIN, SURVEI, DAN PERIJINAN
1. Pengukuran topography m2 90,000.00 0.26863 90,000.00 0.26863 90,000.00 0.26863 - - 90,000.00 0.26863 - -
2. Pembuatan shop drawing dan asbuilt drawing set 2.00 0.06784 1.00 0.03392 1.00 0.03392 - - 1.000 0.03392 1.000 0.03392
3. Penyelidikan tanah
a. DCP titik 30.00 0.00407 30.00 0.00407 30.00 0.00407 - - 30.00 0.00407 - -
b. Sand Cone titik 445.00 0.09056 445.00 0.09056 445.00 0.09056 - - 445.00 0.09056 - -
c. Plat Bearing titik 58.00 0.02164 48.00 0.01791 48.00 0.01791 - - 48.00 0.01791 10.00 0.00373
d. Penyelidikan sampel quarry titik 4.00 0.01085 4.00 0.01085 4.00 0.01085 - - 4.00 0.01085 - -
e. Sondering test titik 10.00 0.02544 10.00 0.02544 10.00 0.02544 - - 10.00 0.02544 - -
Jumlah A 1.1 = 0.48903 0.45138 0.45138 - 0.45138 0.03765
1.2. MANAJEMEN LAPANGAN
1.2.1. ADMINISTRASI LAPANGAN
1. Dokumentasi bln 24.00 0.04884 24.00 0.04884 24.00 0.04884 - - 24.00 0.04884 - -
2 Jaga malam,peralatan kerja dan mesin - mesin oh 720.00 0.38683 720.00 0.38683 720.00 0.38683 - - 720.00 0.38683 - -
1.2.2. OPERASIONAL KANTOR LAPANGAN
1. Membuat dan membongkar direksi keet, los kerja, dan gudang m2 108.00 0.06922 90.00 0.05768 90.00 0.05768 - - 90.00 0.05768 18.00 0.01154
2. Papan nama pekerjaan m2 4.00 0.00391 4.00 0.00391 4.00 0.00391 - - 4.00 0.00391 - -
3. Operasional direksikeet set 1.00 0.03392 1.00 0.03392 1.00 0.03392 - - 1.00 0.03392 - -
Jumlah A 1.2 = 0.54272 0.53118 0.53118 - 0.53118 0.01154
1.3. MOBILISASI DAN DEMOBILISASI
1.3.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
1. Mobilisasi dan demobilisasi Peralatan Berat paket 1.00 0.13567 0.50 0.06784 0.50 0.06784 - - 0.500 0.06784 0.500 0.06784
2. Perbaikan jalan akses masyarakat m2 3,920.00 0.80467 3,920.00 0.80467 3,920.00 0.80467 - - 3,920.00 0.80467 - -
3. Relokasi tiang PLN ttk 14.00 0.20200 14.00 0.20200 14.00 0.20200 - - 14.00 0.20200 - -
Jumlah A 1.3 = 1.14234 1.07451 1.07451 - 1.07451 0.06784
Jumlah A = 2.17409 2.05707 2.05707 - 2.05707 0.11702
B JALUR DAN BANGUNAN
2.1. SIPIL
2.1.1 Pekerjaan Persiapan
1. Pembersihan lapangan dan perataan m2 71,138.20 0.27989 71,138.20 0.27989 71,138.20 0.27989 - - 71,138.20 0.27989 - -
2 Pembongkaran bangunan m2 1,920.00 0.69577 1,920.00 0.69577 1,920.00 0.69577 - - 1,920.00 0.69577 - -
2.1.2. PERBAIKAN TANAH DASAR
1. Perkuatan dengan geotekstile m2 12,500.00 4.04643 12,500.00 4.04643 12,500.00 4.04643 - - 12,500.00 4.04643 - -

2.1.3. KONSTRUKSI TUBUH BAAN


1. Stripping / pengupasan lapisan tanah dasar mak 50cm m2 34,000.00 0.67348 37,946.70 0.75165 34,000.00 0.67348 - - 34,000.00 0.67348 - -
1a. Stripping / pengupasan lapisan tanah dasar mak 50cm m2 3,946.70 0.02410 3,946.70 0.02410 3,946.70 0.02410
2. Timbunan dengan material tanah pilihan m3 158,452.59 22.65852 154,513.11 22.09518 157,413.11 22.50987 - - 157,413.11 22.50987 1,039.48 0.14864
3. Timbunan dengan sirtu (sub balas) m3 8,207.00 1.54437 6,865.55 1.29194 7,215.55 1.35781 - - 7,215.55 1.35781 991.45 0.18657
4. Galian tanah dengan alat berat m3 31,751.49 1.96005 31,751.49 1.96005 31,751.49 1.96005 - - 31,751.49 1.96005 - -
5. Membuang Tanah sejauh 30 m m3 31,751.49 0.74956 31,751.49 0.74956 31,751.49 0.74956 - - 31,751.49 0.74956 - -
-
2.1.4. DRAINASE
1. Drainase beton pracetak 80x80 cm tebal 10 cm m' 2,000.00 4.64162 3,362.40 7.80350 2,000.00 4.64162 - - 2,000.00 4.64162 - -
1a. Drainase beton pracetak 80x80 cm tebal 10 cm m' 1,362.40 2.69053 1,362.40 2.69053 1,362.40 2.69053

2. Retaining wall
Galian Tanah m3 5,700.00 0.35187 15,287.04 0.94368 5,700.00 0.35187 - - 5,700.00 0.35187 - -
a. Galian Tanah m3 9,587.04 0.46305 9,587.04 0.46305 9,587.04 0.46305
Pasangan batu kosong m3 1,488.54 0.58344 1,488.54 0.58344 1,488.54 0.58344 - - 1,488.54 0.58344 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 744.27 0.89163 744.27 0.89163 744.27 0.89163 - - 744.27 0.89163 - -
Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 m3 9,930.52 12.84648 9,930.52 12.84648 9,930.52 12.84648 - - 9,930.52 12.84648 - -
Pembesian dengan besi ulir kg 830,160.18 15.65555 830,160.18 15.65555 830,160.18 15.65555 - - 830,160.18 15.65555 - -
Urugan pasir m3 744.27 0.17237 744.27 0.17237 744.27 0.17237 - - 744.27 0.17237 - -
Bekisting m2 21,675.20 11.53941 21,675.20 11.53941 21,675.20 11.53941 - - 21,675.20 11.53941 - -
Jumlah B 2.1 82.46811 82.30653 82.13290 - 82.13290 0.33521
2.2 JALAN REL
2.2.1. MATERIAL JALAN KA
1. Angkutan rel ton 324.00 0.39439 - - - - - - - - 324.00 0.39439
4 Angkutan Bantalan Beton Lengkap Dengan Alat Penambat Elastis /btg btg 4,834.00 0.39154 4,834.00 0.39154 4,834.00 0.39154 - - 4,834.00 0.39154 - -

Jumlah B 2.2 = 0.78593 0.39154 0.39154 - 0.39154 0.39439


Uraian Sub Output / Komponen REALISASI KONTRAK ADD 8 REALISASI SISA YANG BELUM
NO SATUAN VOLUME BOBOT % S/D MINGGU LALU S/D MINGGU LALU MINGGU INI S/D MINGGU INI DIKERJAKAN
Sub Komponen Detail VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
1 2 3 4 5 6 7 6 7 8 9 10 11 12 13
2.3. PENDUKUNG JALUR DAN BANGUNAN
2.3.1. PAPAN INFORMASI KONSTRUKSI
1. Patok KM-HM buah 30.00 0.03449 - - - - - - - - 30.00 0.03449
2. Tanda-tanda lintas set 1.00 0.00184 - - - - - - - - 1.00 0.00184
3. Pemasangan pagar sterilisasi panel beton t=120 cm m' 3,000.00 4.76292 3,000.00 4.76292 3,000.00 4.76292 - - 3,000.00 4.76292 - -
Jumlah B 2.3 = 4.79925 4.76292 4.76292 - 4.76292 0.03633
2.4 JEMBATAN
1. Underpass akses masyarakat uk. 6x5,5 (2 unit)
2. Box Culvert uk. 4x4 (1 unit)
3. Jembatan Perlintasan Jalan Nasional
1. 'PEKERJAAN PONDASI
Pondasi Abutmen A1
Pondasi Abutmen A2
2. PEKERJAAN ABUTMEN
Pekerjaan Abutmen A1
Pekerjaan Abutmen A2
3. PEKERJAAN DECK
4. I GIRDER
5. BEARING
6. EXPANSION JOINT

B JALUR DAN BANGUNAN

Box Culvert uk. 1x1 (2 unit)


Galian Tanah m3 - - 84.49 0.00522 - - - - - 0.00000 - -
a. Galian Tanah m3 84.49 0.00408 84.49 0.00408 84.49 0.00408
Pasangan batu kosong m3 10.49 0.00411 10.49 0.00411 10.49 0.00411 - - 10.49 0.00411 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.20 0.00743 6.20 0.00743 6.20 0.00743 - - 6.20 0.00743 - -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 45.66 0.06632 45.66 0.06632 45.66 0.06632 - - 45.66 0.06632 - -
Pembesian dengan besi ulir kg 5,447.89 0.10274 5,447.89 0.10274 5,447.89 0.10274 - - 5,447.89 0.10274 - -
Urugan pasir m3 6.20 0.00144 6.20 0.00144 6.20 0.00144 - - 6.20 0.00144 - -
Structural Backfill m3 64.35 0.00750 64.35 0.00750 64.35 0.00750 - - 64.35 0.00750 - -
Bekisting m2 237.96 0.12668 237.96 0.12668 237.96 0.12668 - - 237.96 0.12668 - -

Box Culvert Uk. 2x2 (12 unit)


Galian Tanah m3 1,980.43 0.12225 2,413.94 0.14901 1,980.43 0.12225 - - 1,980.43 0.12225 - -
a. Galian Tanah m3 433.51 0.02094 433.51 0.02094 433.51 0.02094
Pasangan batu kosong m3 138.68 0.05436 138.68 0.05436 138.68 0.05436 - - 138.68 0.05436 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 69.34 0.08307 69.34 0.08307 69.34 0.08307 - - 69.34 0.08307 - -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 856.70 1.24447 856.70 1.24447 856.70 1.24447 - - 856.70 1.24447 - -
Pembesian dengan besi ulir kg 119,199.98 2.24793 119,199.98 2.24793 119,199.98 2.24793 - - 119,199.98 2.24793 - -
Urugan pasir m3 69.34 0.01606 69.34 0.01606 69.34 0.01606 - - 69.34 0.01606 - -
Structural Backfill m3 1,052.25 0.12263 1,052.25 0.12263 1,052.25 0.12263 - - 1,052.25 0.12263 - -
Bekisting m2 3,432.11 1.82718 3,432.11 1.82718 3,432.11 1.82718 - - 3,432.11 1.82718 - -

Underpass Warga 4x4 (1 unit)


Galian Tanah m3 - - 158.08 0.00976 - - - - - 0.00000 - -
a. Galian Tanah m3 158.08 0.00764 158.08 0.00764 158.08 0.00764
Pasangan batu kosong m3 12.74 0.00499 12.74 0.00499 12.74 0.00499 - - 12.74 0.00499 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.37 0.00763 6.37 0.00763 6.37 0.00763 - - 6.37 0.00763 - -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 126.99 0.18447 126.99 0.18447 126.99 0.18447 - - 126.99 0.18447 - -
Pembesian dengan besi ulir kg 18,079.49 0.34095 18,079.49 0.34095 18,079.49 0.34095 - - 18,079.49 0.34095 - -
Urugan pasir m3 6.37 0.00148 6.37 0.00148 6.37 0.00148 - - 6.37 0.00148 - -
Structural Backfill m3 200.85 0.02341 200.85 0.02341 200.85 0.02341 - - 200.85 0.02341 - -
Bekisting m2 388.05 0.20659 388.05 0.20659 388.05 0.20659 - - 388.05 0.20659 - -

Box Culvert Uk. 4x4x2 (1 unit)


Galian Tanah m3 - - 420.86 0.02598 - - - - - - - -
a. Galian Tanah m3 420.86 0.02033 420.86 0.02033 420.86 0.02033
Pasangan batu kosong m3 40.48 0.01587 40.48 0.01587 40.48 0.01587 - - 40.48 0.01587 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 20.24 0.02425 20.24 0.02425 20.24 0.02425 - - 20.24 0.02425 - -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 323.26 0.46958 323.26 0.46958 323.26 0.46958 - - 323.26 0.46958 - -
Pembesian dengan besi ulir kg 37,808.67 0.71301 37,808.67 0.71301 37,808.67 0.71301 - - 37,808.67 0.71301 - -
Urugan pasir m3 20.24 0.00469 20.24 0.00469 20.24 0.00469 - - 20.24 0.00469 - -
Structural Backfill m3 339.90 0.03961 339.90 0.03961 339.90 0.03961 - - 339.90 0.03961 - -
Bekisting m2 812.61 0.43262 812.61 0.43262 812.61 0.43262 - - 812.61 0.43262 - -
-
Box Culvert Uk. 6x4x2 (1 unit)
Galian Tanah m3 - - 367.08 0.02266 - - - - - 0.00000 - -
a. Galian Tanah m3 367.08 0.01773 367.08 0.01773 367.08 0.01773
Pasangan batu kosong m3 19.88 0.00779 19.88 0.00779 19.88 0.00779 - - 19.88 0.00779 - -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 9.94 0.01191 9.94 0.01191 9.94 0.01191 - - 9.94 0.01191 - -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 205.10 0.29794 205.10 0.29794 205.10 0.29794 - - 205.10 0.29794 - -
Pembesian dengan besi ulir kg 26,062.73 0.49150 26,062.73 0.49150 26,062.73 0.49150 - - 26,062.73 0.49150 - -
Urugan pasir m3 9.94 0.00230 9.94 0.00230 9.94 0.00230 - - 9.94 0.00230 - -
Structural Backfill m3 108.15 0.01260 108.15 0.01260 108.15 0.01260 - - 108.15 0.01260 - -
Bekisting m2 638.47 0.33991 638.47 0.33991 638.47 0.33991 - - 638.47 0.33991 - -

1. Bobok Beton m3 54.00 0.03462 54.00 0.03462 54.00 0.03462 - - 54.00 0.03462 - -

Jumlah B 2.4 = 9.77262 9.79229 9.77262 - 9.77262 -


Jumlah B = 97.82591 97.25327 97.05997 - 97.05997 0.76593
Jumlah A + B = 100.000 99.31034 99.11704 - 99.11704 0.88296

Bobot Rencana Komulatif = 98.90841 %


Bobot Realisasi Komulatif = 99.11704 %
Deviasi = 0.20863 %

Aceh Tamiang, 09 Agustus 2020


: MENGETAHUI : DISETUJUI OLEH : DIBUAT OLEH
BALAI TEKNIK PERKERETAAPIAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
KELAS II WILAYAH SUMATERA BAGIAN UTARA
PEJABAT PWMBUAT KOMITMEN ACEH WILAYAH II PT. HARAWANA CONSULTANT PT. DWIFARITA FAJARKHARISMA
KOORDINATOR PENGAWAS

Teuku Defri John F Sitompul, ST Basuki Setyawan, ST


Koordinator Pengawas Team Leader Site Manager
: MENGETAHUI : DISETUJUI OLEH : DIBUAT OLEH
BALAI TEKNIK PERKERETAAPIAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
KELAS II WILAYAH SUMATERA BAGIAN UTARA
PEJABAT PWMBUAT KOMITMEN ACEH WILAYAH II PT. HARAWANA CONSULTANT PT. DWIFARITA FAJARKHARISMA
KOORDINATOR PENGAWAS

Uraian Sub Output / Komponen REALISASI KONTRAK ADD 8 REALISASI SISA YANG BELUM
NO SATUAN VOLUME BOBOT % S/D MINGGU LALU S/D MINGGU LALU MINGGU INI S/D MINGGU INI DIKERJAKAN
Sub Komponen Detail VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
1 Teuku2 Defri 3 4 5 John F Sitompul,
6 ST 7 6 7 8 9 Basuki
10 Setyawan,11 ST 12 13
Koordinator Pengawas Team Leader Site Manager
VOLUME MINGGU
SATUAN BOBOT (%) SKALA MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 10
MINGGU 11 ADD KONTRAK BOBOT MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20 MINGGU 21 MINGGU 22 MINGGU 23 MINGGU 24 MINGGU 25 MINGGU 26 MINGGU 27 MINGGU 28 MINGGU 29 MINGGU 30 MINGGU 31 MINGGU 32 MINGGU 33 MINGGU 34
Uraian Sub Output / Sub Output
REALISASI S.D
Komponen Sub Komponen Detail 04/09/2017 11/09/2017 18/09/2017 25/09/2017 02/10/2017 09/10/2017 16/10/2017 23/10/2017 30/10/2017 06/11/2017 13/11/2017 REALISASI S.D MINGGU 11 VOLUME ACTUAL SISA 20/11/2017 27/11/2017 04/12/2017 11/12/2017 18/12/2017 25/12/2017 01/01/2018 08/01/2018 15/01/2018 22/01/2018 29/01/2018 05/02/2018 12/02/2018 19/02/2018 26/02/2018 05/03/2018 12/03/2018 19/03/2018 26/03/2018 02/04/2018 09/04/2018 16/04/2018 23/04/2018
MINGGU 34
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
10/09/2017 17/09/2017 24/09/2017 01/10/2017 08/10/2017 15/10/2017 22/10/2017 29/10/2017 05/11/2017 12/11/2017 19/11/2017 26/11/2017 03/12/2017 10/12/2017 17/12/2017 24/12/2017 31/12/2017 07/01/2018 14/01/2018 21/01/2018 28/01/2018 04/02/2018 11/02/2018 18/02/2018 25/02/2018 04/03/2018 11/03/2018 18/03/2018 25/03/2018 01/04/2018 08/04/2018 15/04/2018 22/04/2018 29/04/2018

UMUM
1.1. DESAIN, SURVEI, DAN PERIJINAN
100
1.1.1. DESAIN, SURVEI, DAN PERIJINAN
1 Pengukuran topography m2 90,000.00 0.25443 0.0688 0.0688 0.0688 0.0688 0.07464 90,000.00 m2 0.2544 0.1798 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.19787
2 Pembuatan shop drawing dan asbuilt drawing set 2.00 0.06425 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.00869 2.00 set 0.0642 0.0556 0.03212

3 Penyelidikan tanah
a. DCP ttk 30.00 0.00385 0.00008 0.00008 0.00008 0.00412 30.00 ttk 0.0039 - 0.0003 - 0.00009 - 0.00009 - 0.00009 0.00385
b. Sand Cone ttk 445.00 0.08577 0.00164 0.00164 0.00164 - 445.00 ttk 0.0858 0.0858 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.02679
c. Plat Bearing ttk 60.00 0.02120 0.00045 0.00045 0.00045 - 60.00 ttk 0.0212 0.0212 -
d. Penyelidikan sampel quarry ttk 6.00 0.01542 0.0042 0.0042 0.0042 0.0042 0.00556 6.00 ttk 0.0154 0.0099 0.00164 0.00164 0.00164 0.00164 0.00164 0.00164 0.00514
e. Soundering test ttk 10.00 0.02409 ttk 0.02409
1.2. MANAJEMEN LAPANGAN
1.2.1. ADMINISTRASI LAPANGAN
1 Dokumentasi bln 24.00 0.04626 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00491 24.00 bln 0.0463 0.0414 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.01371
2 Jaga malam,peralatan kerja dan mesin - mesin oh 720.00 0.36638 - 720.00 oh 0.3664 0.3664 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.12111
1.2.2. OPERASIONAL KANTOR LAPANGAN
1 Membuat dan membongkar direksi keet, los kerja, dan guda m2 108.00 0.06556 0.0177 0.0177 0.05914 108.00 m2 0.0656 0.0064 0.05463
2 Papan nama pekerjaan m2 4.00 0.00370 0.0040 0.00401 4.00 m2 0.0037 - 0.00031 - 0.00031 0.00370
3 Operasional direksikeet set 1.00 0.03212 0.0348 0.02608 1.00 set 0.0321 0.0060 0.03212

1.3. MOBILISASI DAN DEMOBILISASI


1.3.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
1 Mobilisasi dan demobilisasi Peralatan Berat pkt 1.00 0.12850 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.06954 1.00 pkt 0.1285 0.0590 0.0642
2 Perbaikan jalan akses masyarakat m2 3,920.00 0.76212 - 3,920.00 m2 0.7621 0.7621 -
3. Relokasi tiang PLN ttk 14.00 0.19132 14.00 ttk 0.1913 0.1913 0.0957 0.0957 0.1913
JALUR DAN BANGUNAN
2.1. SIPIL
2.1.1 Pekerjaan Persiapan
1 Pembersihan lapangan dan perataan m2 71,138.20 0.26509 0.0465 0.0465 0.0465 0.28694 71,138.20 m2 0.2651 - 0.0218 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 0.26509
2 Pembongkaran bangunan m2 1,920.00 0.65899 1,920.00 m2 0.6590 0.6590 0.16475 0.16475 0.16475 0.16475 0.65899
2.1.2. PERBAIKAN TANAH DASAR
1 Perkuatan dengan geotekstile m2 12,500.00 3.83249 0.1106 0.1106 0.1106 - 12,500.00 m2 3.8325 3.8325 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 2.91269

2.1.2. KONSTRUKSI TUBUH BAAN


1 Stripping / pengupasan lapisan tanah dasar mak 50cm m2 37,946.70 0.71191 0.0197 0.0197 0.0197 0.56679 37,946.70 m2 0.7119 0.1451 0.1451 0.52363
1a Stripping / pengupasan lapisan tanah dasar mak 50cm
2 Timbunan dengan material tanah pilihan m3 154,783.87 20.96365 0.30599 0.30599 0.30599 0.51310 154,783.87 m3 20.9637 20.4506 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 13.58909
3 Timbunan dengan sirtu (sub balas) m3 8,214.25 1.46401 - 8,214.25 m3 1.4640 1.4640 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 -
70
4 Galian tanah dengan alat berat m3 31,751.49 1.85642 0.2325 0.2325 0.2325 0.07229 31,751.49 m3 1.8564 1.7841 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.92255
5 Membuang Tanah sejauh 30 m m3 31,751.49 0.70993 0.0889 0.0889 0.0889 0.01075 31,751.49 m3 0.7099 0.6992 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.34888

2.1.2. DRAINASE
1 Drainase beton pracetak 80x80 cm tebal 10 cm m' 3,362.40 7.39092 - 3,362.40 m' 7.3909 7.3909 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 -
1a Drainase beton pracetak 80x80 cm tebal 10 cm

2 Retaining wall
Galian Tanah m3 15,287.04 0.89379 - 15,287.04 m3 0.8938 0.8938 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.27922
Galian Tanah
Pasangan batu kosong m3 1,488.54 0.55260 - 1,488.54 m3 0.5526 0.5526 0.0089 0.0089 0.0089 0.0089 0.0089 0.0089 0.31404
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m2 744.27 0.84449 - 744.27 m2 0.8445 0.8445 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.43022
Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 m3 9,930.52 12.16727 - 9,930.52 m3 12.1673 12.1673 0.1962 0.1962 0.1962 0.1962 0.1962 0.1962 3.15151
Pembesian dengan besi ulir m3 830,160.18 14.82782 - 830,160.18 m3 14.8278 14.8278 0.2392 0.2392 0.2392 0.2392 0.2392 0.2392 6.32121
Urugan pasir m3 744.27 0.16325 - 744.27 m3 0.1633 0.1633 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.08317
Bekisting m2 21,675.20 10.92931 - 21,675.20 m2 10.9293 10.9293 0.1763 0.1763 0.1763 0.1763 0.1763 0.1763 2.43521

2.2 JALAN REL


2.2.1. MATERIAL JALAN KA
1 Angkutan rel ton 324.00 0.37354 - 324.00 ton 0.3735 0.3735 -
2 Bantalan Kayu untuk MJ lengkap dengan aksesoris ttk 40.00 0.50863 - 40.00 ttk 0.5086 0.5086 -

3 Ecer Bantalan Beton Beserta alat penambat btg 4,834.00 0.23169 - 4,834.00 btg 0.2317 0.2317 -
4 Angkutan Bantalan Beton Lengkap Dengan Alat Penambat Elastis /btg btg 4,834.00 0.37084

2.2.2. KONSTRUKSI JALAN KA


1 Pengadaan dan pengeceran balas m3 4,785.00 2.1631 - 4,785.00 m3 2.1631 2.1631 -
2 Pemasangan track R.54 dengan pemecokan awal m'sp 2,900.00 0.8657 - 2,900.00 m'sp 0.8657 0.8657 -
3 MTT msp 2,900.00 0.4923 - 2,900.00 msp 0.4923 0.4923 -
4 PBR msp 2,900.00 0.0261 - 2,900.00 msp 0.0261 0.0261 -
5 Pengelasan flash butt R.54 titik 192.00 0.8512 - 192.00 titik 0.8512 0.8512 -

2.3. PENDUKUNG JALUR DAN BANGUNAN


2.3.1. PAPAN INFORMASI KONSTRUKSI
50
1 Patok KM-HM buah 30.00 0.0327 - 30.00 buah 0.0327 0.0327 -
2 Tanda-tanda lintas set 1.00 0.0017 - 1.00 set 0.0017 0.0017 -
3 Pemasangan pagar sterilisasi panel beton t=120 cm m' 3,000.00 4.5111 - 3,000.00 m' 4.5111 4.5111 0.09398 0.09398 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 4.51110
50

2.7. JEMBATAN
1 Underpass akses masyarakat uk. 6x5,5 (2 unit)
2 Box Culvert uk. 4x4 (1 unit)
3 Jembatan Perlintasan Jalan Nasional
1. 'PEKERJAAN PONDASI
2. PEKERJAAN ABUTMEN
3. 'PEKERJAAN DECK
4. 'I GIRDER
5. 'BEARING
6. 'EXPANSION JOINT

Box Culvert uk. 1x1 (2 unit)


Galian Tanah m3 84.49 0.0049 -
a. Galian Tanah
Pasangan batu kosong m3 10.49 0.0039 -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.20 0.0070 -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 45.66 0.0628 -
Pembesian dengan besi ulir kg 5,447.89 0.0973 -
Urugan pasir m3 6.20 0.0014 -
Structural Backfill m3 64.35 0.0071 -
Bekisting m2 237.96 0.1200 -

Box Culvert Uk. 2x2 (12 unit)


Galian Tanah m3 2,413.94 0.1411 -
a. Galian Tanah
Pasangan batu kosong m3 138.68 0.0515 -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 69.34 0.0787 -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 856.70 1.1787 -
Pembesian dengan besi ulir kg 119,199.98 2.1291 -
Urugan pasir m3 69.34 0.0152 -
Structural Backfill m3 1,052.25 0.1161 REALISASI MINGGUAN -
Bekisting m2 3,432.11 1.7306 -

Underpass Warga 4x4 (1 unit)


Galian Tanah m3 158.08 0.0092 -
a. Galian Tanah
Pasangan batu kosong m3 12.74 0.0047 -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.37 0.0072 -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 126.99 0.1747 -
Pembesian dengan besi ulir kg 18,079.49 0.3229 -
Urugan pasir m3 6.37 0.0014 -
Structural Backfill m3 200.85 0.0222 -
Bekisting m2 388.05 0.1957 -

Box Culvert Uk. 4x4x2 (1 unit)


Galian Tanah m3 420.86 0.0246 -
a. Galian Tanah
Pasangan batu kosong m3 40.48 0.0150 -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 20.24 0.0230 -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 323.26 0.4448 -
Pembesian dengan besi ulir kg 37,808.67 0.6753 -
Urugan pasir m3 20.24 0.0044 -
Structural Backfill m3 339.90 0.0375 -
Bekisting m2 812.61 0.4097 -

Box Culvert Uk. 6x4x2 (1 unit)


Galian Tanah m3 367.08 0.0215 -
a. Galian Tanah
Pasangan batu kosong m3 19.88 0.0074 -
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 9.94 0.0113 RENCANA MINGGUAN -
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 205.10 0.2822 -
Pembesian dengan besi ulir kg 26,062.73 0.4655 -
Urugan pasir m3 9.94 0.0022 -
Structural Backfill m3 108.15 0.0119 -
Bekisting m2 638.47 0.3219 -

1. Bobok Beton m3 54.00 0.0328

100.0000

BOBOT RENCANA MINGGUAN : 0.10408 0.13485 0.08233 0.08233 0.01766 0.01766 0.01766 0.01766 0.80689 0.80689 0.80689 BOBOT S/D MGG 11 KONTRAK 90.33051 88.62395 0.77159 0.62677 0.62677 0.62677 0.55768 0.55768 0.46038 0.61368 0.61641 0.61641 0.64756 0.64756 0.77945 0.77945 0.87343 0.87352 0.87352 1.52479 1.52479 1.52479 1.52479 1.52479 1.52479 BOBOT S/D MGG
2.05980 34 KONTRAK ADD
BOBOT KOMULATIF RENCANA MINGGUAN : 0.00000 0.10408 0.23893 0.32127 0.40360 0.42126 0.43892 0.45657 0.47423 1.28112 2.08800 2.89489 2.05980 2.83139 3.45815 4.08492 4.71169 5.26937 5.82705 6.28743 6.90111 7.51752 8.13393 8.78149 9.42904 10.20849 10.98795 11.86138 12.73490 13.60842 15.13320 16.65799 18.18278 19.70756 21.23235 22.75714 1

BOBOT REALISASI MINGGUAN : 0 0.00000 0.00089 0.00445 0.00289 0.02451 0.08435 0.10977 0.93832 0.19340 0.17848 0.52273 BOBOT S/D MGG 11 ADEDNDUM 14.72893 9.14805 4.14984 0.60500 0.224118367 0.004245882 0.004246088 0.114299523 0.238935138 0.17170 0.005913392 0.004250229 0.096288471 0.148066415 0.106703951 0.17744 0.90731 1.31701 1.30047 1.53812 1.00613 2.02172 0.00425 BOBOT S/D MGG
2.03259 34 ADEDNDUM 2
BOBOT KOMULATIF REALISASI MINGGUAN : 0 0.00000 0.00089 0.00535 0.00824 0.03275 0.11710 0.22687 1.16519 1.35859 1.53707 2.05980 2.03259 16.76152 16.76152 25.90957 30.05941 30.66441 30.88853 30.89277 30.89702 31.01132 31.25025 31.42195 31.42786 31.43211 31.52840 31.67647 31.78317 31.96062 32.86793 34.18494 35.48541 37.02353 38.02966 40.05138 40.05563

DEVIASI : -0.10408 -0.23804 -0.31592 -0.39536 -0.38850 -0.32182 -0.22970 0.69096 0.07748 -0.55093 -0.83509 DEVIASI 0.02721 13.93013 22.45141 25.97449 25.95272 25.61916 25.06572 24.60959 24.11021 23.73273 23.28802 22.64638 22.00307 21.31991 20.68852 19.92179 19.22572 19.25951 19.05173 18.82742 18.84075 18.32209 18.81903 17.29849 DEVIASI
WAKTU PELAKSANAAN
ADD KONTRAK BOBOT MINGGU 35 MINGGU 36 MINGGU 37 MINGGU 38 MINGGU 39 MINGGU 40 MINGGU 41 MINGGU 42 MINGGU 43 MINGGU 44 MINGGU 45 MINGGU 46 MINGGU 47 MINGGU 48 MINGGU 49 MINGGU 50 MINGGU 51 MINGGU 52 MINGGU 53 MINGGU 54 MINGGU 55 MINGGU 56 MINGGU 57 MINGGU 58 MINGGU 59 MINGGU 60 MINGGU 61 MINGGU 62 MINGGU 63 MINGGU 64 MINGGU 65 MINGGU 66 MINGGU 67 MINGGU 68 MINGGU 69 MINGGU 70 MINGGU 71 MINGGU 72 MINGGU 73 MINGGU 74 MINGGU 75 MINGGU 76 MINGGU 77 MINGGU 78 MINGGU 79 MINGGU 80 MINGGU 81 MINGGU 82 MINGGU 83 MINGGU 84 ADD KONTRAK BOBOT MINGGU 85 MINGGU 86 MINGGU 87 MINGGU 88 MINGGU 89 MINGGU 90 MINGGU 91 MINGGU 92 MINGGU 93 MINGGU 94 MINGGU 95 MINGGU 96 MINGGU 97 MINGGU 98 MINGGU 99 ADD KONTRAK
REALISASI S.D REALISASI S.D
VOLUME ACTUAL 30/04/2018 07/05/2018 14/05/2018 21/05/2018 28/05/2018 04/06/2018 11/06/2018 18/06/2018 25/06/2018 02/07/2018 09/07/2018 16/07/2018 23/07/2018 30/07/2018 06/08/2018 13/08/2018 20/08/2018 27/08/2018 03/09/2018 10/09/2018 17/09/2018 24/09/2018 01/10/2018 08/10/2018 15/10/2018 22/10/2018 29/10/2018 05/11/2018 12/11/2018 19/11/2018 26/11/2018 03/12/2018 10/12/2018 17/12/2018 24/12/2018 31/12/2018 07/01/2019 14/01/2019 21/01/2019 28/01/2019 04/02/2019 11/02/2019 18/02/2019 25/02/2019 04/03/2019 11/03/2019 18/03/2019 25/03/2019 01/04/2019 08/04/2019 VOLUME ACTUAL 15/04/2019 22/04/2019 29/04/2019 06/05/2019 13/05/2019 20/05/2019 27/05/2019 03/06/2019 10/06/2019 17/06/2019 24/06/2019 01/07/2019 08/07/2019 15/07/2019 22/07/2019 VOLUME ACTUAL
SISA MINGGU 84 SISA MINGGU 99
VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL
06/05/2018 13/05/2018 20/05/2018 27/05/2018 03/06/2018 10/06/2018 17/06/2018 24/06/2018 01/07/2018 08/07/2018 15/07/2018 22/07/2018 29/07/2018 05/08/2018 12/08/2018 19/08/2018 26/08/2018 02/09/2018 09/09/2018 16/09/2018 23/09/2018 30/09/2018 07/10/2018 14/10/2018 21/10/2018 28/10/2018 04/11/2018 11/11/2018 18/11/2018 25/11/2018 02/12/2018 09/12/2018 16/12/2018 23/12/2018 30/12/2018 06/01/2019 13/01/2019 20/01/2019 27/01/2019 03/02/2019 10/02/2019 17/02/2019 24/02/2019 03/03/2019 10/03/2019 17/03/2019 24/03/2019 31/03/2019 07/04/2019 14/04/2019 21/04/2019 28/04/2019 05/05/2019 12/05/2019 19/05/2019 26/05/2019 02/06/2019 09/06/2019 16/06/2019 23/06/2019 30/06/2019 07/07/2019 14/07/2019 21/07/2019 28/07/2019

90,000.00 m2 0.25443 0.05656 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.25443 90,000.00 m2 0.25443 - - - 0.254 90,000.00
2.00 set 0.06425 0.03212 0.03212 2.00 set 0.06425 0.03212 0.032 2.00
-
30.00 ttk 0.00385 - 0.00385 30.00 ttk 0.00385 - 0.004 30.00
400.00 ttk 0.07710 0.05031 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.05031 445.00 ttk 0.08577 0.03547 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.060 445.00
60.00 ttk 0.02120 0.02120 - ttk 0.02120 0.02120 - - 0.0053 0.0053 0.0053 0.0053 0.004 60.00
6.00 ttk 0.01542 0.01028 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171 0.00514 6.00 ttk 0.01542 0.01028 0.00514 0.00514 0.005 6.00
10.00 ttk 0.02409 - - 0.02409 10.00 ttk 0.02409 - 0.024 10.00

24.00 bln 0.04626 0.03255 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.03466 24.00 bln 0.04626 0.01160 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.041 24.00
720.00 oh 0.36638 0.24527 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.29921 720.00 oh 0.36638 0.06717 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.353 720.00

108.00 m2 0.06556 0.01093 0.05463 108.00 m2 0.06556 0.01093 0.055 108.00


4.00 m2 0.00370 - 0.00370 4.00 m2 0.00370 - 0.004 4.00
1.00 set 0.03212 - 0.03212 1.00 set 0.03212 - 0.032 1.00

1.00 pkt 0.12850 0.06425 0.06425 1.00 pkt 0.12850 0.06425 0.064 1.00
3,600.00 m2 0.69991 0.69991 - 3,920.00 m2 0.76212 0.76212 - 3,920.00
14.00 ttk 0.19132 - 0.19132 14.00 ttk 0.19132 - 0.191 14.00

71138.2008 m2 0.26509 - 0.26509 71,138.20 m2 0.26509 - 0.265 71,138.20


1920.00 m2 0.65899 - 0.65899 1,920.00 m2 0.65899 - 0.659 1,920.00

12,500.00 m2 3.83249 0.91980 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 3.83249 12,500.00 m2 3.83249 - 3.832 12,500.00

27,910.93 m2 0.52363 - 0.52363 37,946.70 m2 0.71191 0.18828 0.03766 0.03766 0.03766 0.03766 0.03766 0.712 37,946.70

155,308.556 m3 21.03472 7.44562 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 18.89775 154,783.87 m3 20.96365 2.06590 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 18.898 154,783.87
8,214.25 m3 1.46401 1.46401 - 8,214.25 m3 1.46401 1.46401 0.4880 0.4880 0.4880 0.878 8,214.25
36,035.35 m3 2.10688 1.18434 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 1.81417 31,751.49 m3 1.85642 0.04225 0.0070 0.0070 0.0070 0.0070 0.0070 0.0070 1.856 31,751.49
36,035.35 m3 0.80571 0.45683 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.68985 31,751.49 m3 0.70993 0.02008 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.710 31,751.49

3,351.00 m' 7.36586 7.36586 - - 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 5.61595 3,362.40 m' 7.39092 1.77497 0.8875 0.8875 6.606 3,362.40

15,004.76 m3 0.87729 0.59807 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.78240 15,287.04 m3 0.89379 0.11139 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.894 15,287.04

1,436.76 m3 0.53337 0.21933 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.40428 1,488.54 m3 0.55260 0.14832 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.492 1,488.54
718.38 m2 0.81511 0.38488 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.69951 744.27 m2 0.84449 0.14497 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.833 744.27
9,520.03 m3 11.66433 8.51281 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 8.79320 9,930.52 m3 12.16727 3.37407 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 10.640 9,930.52
809,155.34 kg 14.45265 8.13144 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 13.12466 830,160.18 kg 14.82782 1.70316 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 14.766 830,160.18
718.38 m3 0.15758 0.07441 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.11943 744.27 m3 0.16325 0.04382 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.161 744.27
20,652.24 m2 10.41350 7.97829 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 7.92599 21,675.20 m2 10.92931 3.00332 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.4378 0.1565 0.15651 9.648 21,675.20

324.00 ton 0.37354 0.37354 - 324.00 ton 0.37354 0.37354 0.18677 - 324.00
40.00 ttk 0.50863 0.50863 - 40.00 ttk 0.50863 0.50863 0.25431 - 40.00
4834.00 btg 0.23169 0.23169 - 4,834.00 btg 0.23169 0.23169 0.11585 - 4,834.00
- 4,834.00 btg 0.37084 0.37084 0.18542 - 4,834.00

4785.00 m3 2.16311 2.16311 - 4,785.00 m3 2.16311 2.16311 0.54078 - 4,785.00


2900.00 m'sp 0.86566 0.86566 - 2,900.00 m'sp 0.86566 0.86566 - 2,900.00
2900.00 msp 0.49227 0.49227 - 2,900.00 msp 0.49227 0.49227 - 2,900.00
2900.00 msp 0.02609 0.02609 - 2,900.00 msp 0.02609 0.02609 - 2,900.00
192.00 titik 0.85118 0.85118 - 192.00 titik 0.85118 0.85118 - 192.00

30.00 buah 0.03266 0.03266 - 30.00 buah 0.03266 0.03266 - 30.00


1.00 set 0.00175 0.00175 - 1.00 set 0.00175 0.00175 - 1.00
3,000.00 m' 4.51110 - 4.51110 3,000.00 m' 4.51110 - 4.511 3,000.00

84.49 m3 0.00494 0.00494 0.00247 0.00247 0.00269 84.49 m3 0.00494 0.00225 0.00225 0.005 84.49

6.60 m3 0.00245 0.00245 0.00245 0.00134 10.49 m3 0.00389 0.00256 0.00256 0.004 10.49
3.30 m3 0.00374 0.00374 0.00374 0.00204 6.20 m3 0.00704 0.00500 0.00500 0.007 6.20
80.48 m3 0.11073 0.11073 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.05269 45.66 m3 0.06282 0.01012 0.00506 0.00506 0.063 45.66
7,034.97 kg 0.12565 0.12565 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.06301 5,447.89 kg 0.09731 0.03430 0.01715 0.01715 0.097 5,447.89
3.30 m3 0.00072 0.00072 0.00072 0.00039 6.20 m3 0.00136 0.00097 0.00097 0.001 6.20
64.35 m3 0.00710 0.00710 0.00355 0.00355 0.00387 64.35 m3 0.00710 0.00323 0.00323 0.007 64.35
347.64 m2 0.17529 0.17529 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.08514 237.96 m2 0.11999 0.03484 0.01742 0.01742 0.120 237.96

2,488.42 m3 0.14549 0.14549 0.03637 0.03637 0.03637 0.03637 0.11408 2,413.94 m3 0.14114 0.02705 0.02705 0.141 2,413.94

126.10 m3 0.04681 0.04681 0.00585 0.00585 0.00585 0.00585 0.00585 0.00585 0.00585 0.00585 0.04139 138.68 m3 0.05148 0.01010 0.01010 0.051 138.68
63.05 m3 0.07154 0.07154 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.06325 69.34 m3 0.07868 0.01543 0.01543 0.079 69.34
1,148.23 m3 1.57978 1.57978 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.94574 856.70 m3 1.17868 0.23294 0.11647 0.11647 1.179 856.70
124,190.18 kg 2.21821 2.21821 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 1.71452 119,199.98 kg 2.12908 0.41456 0.20728 0.20728 2.129 119,199.98
63.05 m3 0.01383 0.01383 0.00173 0.00173 0.00173 0.00173 0.00173 0.00173 0.00173 0.00173 0.01223 69.34 m3 0.01521 0.00298 0.00298 0.015 69.34
1,109.44 m3 0.12246 0.12246 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.09393 1,052.25 m3 0.11615 0.02222 0.02222 0.116 1,052.25
4,315.16 m2 2.17584 2.17584 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 1.38546 3,432.11 m2 1.73058 0.34512 0.17256 0.17256 1.731 3,432.11

158.08 m3 0.00924 0.00924 0.00462 0.00462 0.00924 158.08 m3 0.00924 - 0.009 158.08

12.74 m3 0.00473 0.00473 0.00236 0.00236 0.00473 12.74 m3 0.00473 - 0.005 12.74
6.37 m3 0.00723 0.00723 0.00361 0.00361 0.00723 6.37 m3 0.00723 - 0.007 6.37
166.19 m3 0.22865 0.22865 0.05716 0.05716 0.05716 0.05716 0.17471 126.99 m3 0.17471 - 0.175 126.99
19,806.47 kg 0.35377 0.35377 0.08844 0.08844 0.08844 0.08844 0.32292 18,079.49 kg 0.32292 - 0.323 18,079.49
6.37 m3 0.00140 0.00140 0.00070 0.00070 0.00140 6.37 m3 0.00140 - 0.001 6.37
200.85 m3 0.02217 0.02217 0.00739 0.00739 0.00739 0.02217 200.85 m3 0.02217 - - 0.022 200.85
493.07 m2 0.24862 0.24862 0.06215 0.06215 0.06215 0.06215 0.19567 388.05 m2 0.19567 - 0.196 388.05

420.86 m3 0.02461 0.02461 0.01230 0.01230 - 420.86 m3 0.02461 0.02461 0.02461 - 420.86

40.48 m3 0.01503 0.01503 0.00751 0.00751 - 40.48 m3 0.01503 0.01503 0.01503 - 40.48
20.24 m3 0.02297 0.02297 0.01148 0.01148 - 20.24 m3 0.02297 0.02297 0.02297 - 20.24
346.40 m3 0.47660 0.47660 0.11915 0.11915 0.11915 0.11915 - 323.26 m3 0.44476 0.44476 0.22238 0.22238 - 323.26
38,738.53 kg 0.69192 0.69192 0.17298 0.17298 0.17298 0.17298 - 37,808.67 kg 0.67532 0.67532 0.49283 0.18249 - 37,808.67
20.24 m3 0.00444 0.00444 0.00222 0.00222 - 20.24 m3 0.00444 0.00444 0.00444 - 20.24
339.90 m3 0.03752 0.03752 0.01251 0.01251 0.01251 - 339.90 m3 0.03752 0.03752 0.03752 - 339.90
1,005.77 m2 0.50714 0.50714 0.12679 0.12679 0.12679 0.12679 - 812.61 m2 0.40975 0.40975 0.20487 0.20487 - 812.61

138.15 m3 0.00808 0.00808 0.00404 0.00404 - 367.08 m3 0.02146 0.02146 0.02146 0.021 367.08

34.08 m3 0.01265 0.01265 0.00633 0.00633 - 19.88 m3 0.00738 0.00738 0.00738 0.007 19.88
17.04 m3 0.01933 0.01933 0.00967 0.00967 - 9.94 m3 0.01128 0.01128 0.01128 0.011 9.94
352.28 m3 0.48468 0.48468 0.12117 0.12117 0.12117 0.12117 - 205.10 m3 0.28219 0.28219 0.09406 0.09406 0.09406 0.282 205.10
23,923.23 kg 0.42730 0.42730 0.10683 0.10683 0.10683 0.10683 - 26,062.73 kg 0.46552 0.46552 0.15517 0.23611 0.07423 0.466 26,062.73
17.04 m3 0.00374 0.00374 0.00187 0.00187 - 9.94 m3 0.00218 0.00218 0.00218 0.002 9.94
185.40 m3 0.02046 0.02046 0.00682 0.00682 0.00682 - 108.15 m3 0.01194 0.01194 0.01194 0.012 108.15
1,071.23 m2 0.54015 0.54015 0.13504 0.13504 0.13504 0.13504 - 638.47 m2 0.32194 0.32194 0.16097 0.16097 0.322 638.47

- 54.00 m3 0.03279 0.03279 0.03279 - 54.00

100.00000 62.48267 0.47096 0.47096 0.47096 0.47096 0.47096 0.47096 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.47171 0.47489 0.52445 0.52070 0.52070 0.52070 0.52070 0.52070 0.52070 0.52425 0.76081 0.75726 0.75726 0.75726 0.72089 0.72089 0.72089 0.72857 1.29466 1.28697 1.29075 1.29075 1.10503 1.52803 1.50089 1.96666 1.96666 1.55998 1.93242 1.92018 1.91734 1.91734 1.55430 1.54748 1.54748 BOBOT S/D MGG 100.00000 24.97181 0.74118 0.74118 0.99581 0.99581 0.99581 1.59809 1.59000 0.00415 0.00415 1.37870 1.38336 2.77279 1.89635 2.17409 2.18006 BOBOT S/D MGG
40.05563 84 KONTRAK ADD 75.02819 99 KONTRAK ADD 85.09150
37.51733 37.98828 38.45924 38.93020 39.40115 39.87211 40.34307 40.81231 41.28155 41.75080 42.22004 42.68929 43.15853 43.62777 44.09702 44.56626 45.03797 45.51286 46.03731 46.55801 47.07871 47.59941 48.12012 48.64082 49.16152 49.68578 50.44659 51.20385 51.96111 52.71837 53.43925 54.16014 54.88103 55.60960 56.90426 58.19123 59.48198 60.77273 61.87776 63.40579 64.90668 66.87334 68.84000 70.39997 72.33239 74.25257 76.16990 78.08724 79.64154 81.18903 82.73651 3 75.02819 75.76937 76.51055 77.50636 78.50218 79.49799 81.09608 82.68608 82.69022 82.69437 84.07307 85.45643 88.22921 90.12556 92.29965 94.47971 3

1.23430 2.42714 1.61500 1.61087 1.50734 0.87979 0.00398 0.00398 1.68580 1.14925 0.59724 0.59723 1.63629 1.88968 2.32309 1.86242 0.96559 0.96972 0.09164 0.00976 0.72043 0.74694 0.61818 0.65034 0.61818 0.61973 1.16108 1.23422 0.62065 0.61818 0.61818 0.00647 0.00666 0.03382 0.00553 0.00554 0.00398 0.00398 0.00399 0.00399 0.00398 0.45119 1.65972 1.23218 1.56409 1.22361 0.00398 0.00399 0.00398 0.00398 BOBOT S/D MGG 0.41207 0.00400 0.00400 0.00398 0.00398 0.09723 0.00397 0.00397 0.00398 0.00398 0.14161 0.59304 0.60112 2.99945 5.1870 BOBOT S/D MGG
37.51733 84 ADEDNDUM 3 75.02819 99 ADEDNDUM 3 85.09150
37.51732749 38.75163 41.17876 42.79377 44.40464 45.91198 46.79177 46.79574 46.79973 48.48553 49.63478 50.23201 50.82925 52.46554 54.35521 56.67831 58.54073 59.50632 60.47604 60.56768 60.57744 61.29787 62.04481 62.66299 63.31332 63.93150 64.55124 65.71232 66.94653 67.56718 68.18536 68.80352 68.81000 68.81666 68.85048 68.85600 68.86155 68.86553 68.86950 68.87349 68.87749 68.88147 69.33266 70.99237 72.22455 73.78864 75.01225 75.01624 75.02023 75.02421 75.02819 75.0282 75.44026 75.44426 75.44825 75.45224 75.45621 75.55343 75.55740 75.56136 75.56534 75.56932 75.71093 76.30397 76.90509 79.90454 85.09150
2.53830 0.76333 2.71951 3.86357 5.00349 6.03987 6.44871 5.98344 5.51818 6.73473 7.41474 7.54273 7.67072 8.83777 10.25820 12.11205 13.50276 13.99346 14.43873 14.00967 13.49873 13.69846 13.92469 14.02217 14.15180 14.24572 14.10465 14.50847 14.98543 14.84881 14.74610 14.64339 13.92897 13.20706 11.94622 10.66477 9.37956 8.09279 6.99174 5.46770 3.97081 2.00813 0.49266 0.59240 (0.10784) (0.46393) (1.15766) (3.07100) (4.62131) (6.16482) (7.70832) DEVIASI (0.00000) (0.32911) (1.06629) (2.05811) (3.04994) (4.04179) (5.54265) (7.12868) (7.12887) (7.12903) (8.50375) (9.74550) (11.92524) (13.22048) (12.39511) (9.38821) DEVIASI -
WAKTU PELAKSANAAN
ADD KONTRAK BOBOT MINGGU 100 MINGGU 101 MINGGU 102 MINGGU 103 MINGGU 104 MINGGU 105 MINGGU 106 MINGGU 107 MINGGU 108 MINGGU 109 MINGGU 110 MINGGU 111 MINGGU 112 MINGGU 113 ADD KONTRAK BOBOT
REALISASI S.D
VOLUME ACTUAL 29/07/2019 05/08/2019 12/08/2019 19/08/2019 26/08/2019 02/09/2019 09/09/2019 16/09/2019 23/09/2019 30/09/2019 07/10/2019 14/10/2019 21/10/2019 28/10/2019 VOLUME ACTUAL
SISA MINGGU 113 SISA
SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT
04/08/2019 11/08/2019 18/08/2019 25/08/2019 01/09/2019 08/09/2019 15/09/2019 22/09/2019 29/09/2019 06/10/2019 13/10/2019 20/10/2019 27/10/2019 03/11/2019

m2 0.254 - 0.269 90,000.00 m2 0.269


set 0.064 0.032 0.034 2.00 set 0.068 0.034

ttk 0.004 - 0.004 30.00 ttk 0.004 -


ttk 0.086 0.026 0.009 0.009 0.009 0.080 445.00 ttk 0.091 0.010
ttk 0.021 0.018 0.004 58.00 ttk 0.022 0.018
ttk 0.015 0.010 0.005 0.005 0.011 4.00 ttk 0.011 -
ttk 0.024 - 0.025 10.00 ttk 0.025 -

bln 0.046 0.0050.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.049 24.00 bln 0.049 -
oh 0.366 0.0140.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.387 720.00 oh 0.387 -

m2 0.066 0.011 0.058 108.00 m2 0.069 0.012


m2 0.004 - 0.004 4.00 m2 0.004 -
set 0.032 - 0.034 1.00 set 0.034 -

pkt 0.128 0.064 0.068 1.00 pkt 0.136 0.068


m2 0.762 0.762 - 3,920.00 m2 0.805 0.805
ttk 0.191 - 0.202 14.00 ttk 0.202 -

m2 0.265 - 0.280 71,138.20 m2 0.280 -


m2 0.659 - 0.696 1,920.00 m2 0.696 -

m2 3.832 - 4.046 12,500.00 m2 4.046 -

m2 0.712 - 0.752 37,946.70 m2 0.752 -

m3 20.964 2.066 0.258 0.258 0.258 0.258 0.258 0.258 0.258 21.164 154,783.87 m3 22.134 0.970
m3 1.464 0.586 0.146 0.146 0.927 7,413.95 m3 1.395 0.468
m3 1.856 - 1.960 31,751.49 m3 1.960 -
m3 0.710 - 0.750 31,751.49 m3 0.750 -

m' 7.391 0.785 7.439 3,362.40 m' 7.803 0.365

m3 0.894 - 0.944 15,287.04 m3 0.944 -

m3 0.553 0.061 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.583 1,488.54 m3 0.583 -
m2 0.844 0.012 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.892 744.27 m2 0.892 -
m3 12.167 1.527 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 12.846 9,930.52 m3 12.846 -
kg 14.828 0.062 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 15.656 830,160.18 kg 15.656 -
m3 0.163 0.002 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.172 744.27 m3 0.172 -
m2 10.929 1.281 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 11.539 21,675.20 m2 11.539 -

ton 0.374 0.374 - 324.00 ton 0.394 0.394


ttk 0.509 0.509 - - ttk 0.000 -

btg 0.232 0.232 - - btg 0.000 -


btg 0.371 0.371 - 4,834.00 btg 0.392 0.392

m3 2.163 2.163 - - m3 0.000 -


m'sp 0.866 0.866 - - m'sp 0.000 -
msp 0.492 0.492 - - msp 0.000 -
msp 0.026 0.026 - - msp 0.000 -
titik 0.851 0.851 - - titik 0.000 -

buah 0.033 0.033 - 30.00 buah 0.034 0.034


set 0.002 0.002 - 1.00 set 0.002 0.002
m' 4.511 - 4.763 3,000.00 m' 4.763 -

m3 0.005 - 0.005 84.49 m3 0.005 -

m3 0.004 - 0.004 10.49 m3 0.004 -


m3 0.007 - 0.007 6.20 m3 0.007 -
m3 0.063 - 0.066 45.66 m3 0.066 -
kg 0.097 - 0.103 5,447.89 kg 0.103 -
m3 0.001 - 0.001 6.20 m3 0.001 -
m3 0.007 - 0.007 64.35 m3 0.007 -
m2 0.120 - 0.127 237.96 m2 0.127 -

m3 0.141 - 0.149 2,413.94 m3 0.149 -

m3 0.051 - 0.054 138.68 m3 0.054 -


m3 0.079 - 0.083 69.34 m3 0.083 -
m3 1.179 - 1.244 856.70 m3 1.244 -
kg 2.129 - 2.248 119,199.98 kg 2.248 -
m3 0.015 - 0.016 69.34 m3 0.016 -
m3 0.116 - 0.123 1,052.25 m3 0.123 -
m2 1.731 - 1.827 3,432.11 m2 1.827 -

m3 0.009 - 0.010 158.08 m3 0.010 -

m3 0.005 - 0.005 12.74 m3 0.005 -


m3 0.007 - 0.008 6.37 m3 0.008 -
m3 0.175 - 0.184 126.99 m3 0.184 -
kg 0.323 - 0.341 18,079.49 kg 0.341 -
m3 0.001 - 0.001 6.37 m3 0.001 -
m3 0.022 - 0.023 200.85 m3 0.023 -
m2 0.196 - 0.207 388.05 m2 0.207 -

m3 0.025 0.025 0.025 0.026 420.86 m3 0.026 -

m3 0.015 0.015 0.015 0.016 40.48 m3 0.016 -


m3 0.023 0.023 0.023 0.024 20.24 m3 0.024 -
m3 0.445 0.445 0.111 0.111 0.111 0.111 0.470 323.26 m3 0.470 -
kg 0.675 0.675 0.169 0.169 0.169 0.169 0.713 37,808.67 kg 0.713 -
m3 0.004 0.004 0.004 0.005 20.24 m3 0.005 -
m3 0.038 0.038 0.038 0.040 339.90 m3 0.040 -
m2 0.410 0.410 0.137 0.137 0.137 0.433 812.61 m2 0.433 -

m3 0.021 - 0.023 367.08 m3 0.023 -

m3 0.007 - 0.008 19.88 m3 0.008 -


m3 0.011 - 0.012 9.94 m3 0.012 -
m3 0.282 - 0.298 205.10 m3 0.298 -
kg 0.466 - 0.492 26,062.73 kg 0.492 -
m3 0.002 - 0.002 9.94 m3 0.002 -
m3 0.012 - 0.013 108.15 m3 0.013 -
m2 0.322 - 0.340 638.47 m2 0.340 -

m3 0.033 0.033 0.016 0.016 0.035 54.00 m3 0.035 -

100.000 14.909 0.216 0.216 0.211 0.211 0.211 0.211 0.228 0.494 0.545 0.895 0.886 0.886 0.933 0.616 BOBOT S/D MGG 100.000 3.57014
113 KONTRAK 91.23928
85.091 85.30783 85.524 85.735 85.947 86.158 86.369 86.597 87.091 87.636 88.531 89.417 90.303 91.236 91.852 ADD 5 96.42986

0.07994 0.02935 0.34105 0.10545 0.47819 1.38760 0.329049996 1.19140 0.74016 1.29369 0.05269 0.03752 0.07449 0.00720 BOBOT S/D MGG
113 ADEDNDUM 6 96.42986
85.091 85.17144 85.20079 85.54184 85.64729 86.12548 87.51309 87.84214 89.03354 89.77369 91.06739 91.12007 91.15759 91.23208 91.23928 96.430

-0.13639 -0.32338 -0.19353 -0.29928 -0.03229 1.14412 1.24557 1.94253 2.13760 2.53665 1.70330 0.85478 -0.00410 -0.61274 DEVIASI (5.19059)
MINGGU 114 MINGGU 115 MINGGU 116 MINGGU 117 MINGGU 118 ADD KONTRAK BOBOT MINGGU 119 MINGGU 120 MINGGU 121 MINGGU 122 MINGGU 123 MINGGU 124 MINGGU 125 MINGGU 126 MINGGU 127 MINGGU 128 MINGGU 129 MINGGU 130 MINGGU 131 MINGGU 132 MINGGU 133 MINGGU 134 MINGGU 135 MINGGU 136 ADD KONTRAK BOBOT MINGGU 137 MINGGU 138 MINGGU 139 MINGGU 140 MINGGU 141 MINGGU 142 MINGGU 143 MINGGU 144 MINGGU 145 MINGGU 146 MINGGU 147 MINGGU 148 MINGGU 149 MINGGU 150 ADD KONTRAK BOBOT MINGGU 151 MINGGU 152 MINGGU 153 MINGGU 154 MINGGU 155 MINGGU 156 MINGGU 157 MINGGU 158 MINGGU 159 MINGGU 160 MINGGU 161 MINGGU 162 MINGGU 163 MINGGU 164 MINGGU 165 MINGGU 166 MINGGU 167 MINGGU 168 MINGGU 169 MINGGU 170 MINGGU 171 MINGGU 172 MINGGU 173 MINGGU 174 MINGGU 175
REALISASI REALISASI REALISASI
04/11/2019 11/11/2019 18/11/2019 25/11/2019 02/12/2019 S.D MINGGU VOLUME ACTUAL 09/12/2019 16/12/2019 23/12/2019 30/12/2019 06/01/2020 13/01/2020 20/01/2020 27/01/2020 03/02/2020 10/02/2020 17/02/2020 24/02/2020 02/03/2020 09/03/2020 16/03/2020 23/03/2020 30/03/2020 06/04/2020 S.D MINGGU VOLUME ACTUAL 13/04/2020 20/04/2020 27/04/2020 04/05/2020 11/05/2020 18/05/2020 25/05/2020 01/06/2020 08/06/2020 15/06/2020 22/06/2020 29/06/2020 06/07/2020 13/07/2020 S.D MINGGU VOLUME ACTUAL 20/07/2020 27/07/2020 03/08/2020 10/08/2020 17/08/2020 24/08/2020 31/08/2020 07/09/2020 14/09/2020 21/09/2020 28/09/2020 05/10/2020 12/10/2020 19/10/2020 26/10/2020 02/11/2020 09/11/2020 16/11/2020 23/11/2020 30/11/2020 07/12/2020 14/12/2020 21/12/2020 28/12/2020 04/01/2021
118 VOL SAT BOBOT
SISA 136 VOL SAT BOBOT
SISA 150 VOL SAT BOBOT
SISA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
10/11/2019 17/11/2019 24/11/2019 01/12/2019 08/12/2019 15/12/2019 22/12/2019 29/12/2019 05/01/2020 12/01/2020 19/01/2020 26/01/2020 02/02/2020 09/02/2020 16/02/2020 23/02/2020 01/03/2020 08/03/2020 15/03/2020 22/03/2020 29/03/2020 05/04/2020 12/04/2020 19/04/2020 26/04/2020 03/05/2020 10/05/2020 17/05/2020 24/05/2020 31/05/2020 07/06/2020 14/06/2020 21/06/2020 28/06/2020 05/07/2020 12/07/2020 19/07/2020 26/07/2020 02/08/2020 09/08/2020 16/08/2020 23/08/2020 30/08/2020 06/09/2020 13/09/2020 20/09/2020 27/09/2020 04/10/2020 11/10/2020 18/10/2020 25/10/2020 01/11/2020 08/11/2020 15/11/2020 22/11/2020 29/11/2020 06/12/2020 13/12/2020 20/12/2020 27/12/2020 03/01/2021 10/01/2021

0.26863 90,000.00 m2 0.26863 - 0.26863 90,000.00 m2 0.26863 - 0.26863 90,000.00 m2 0.26863 -


0.03392 2.00 set 0.06784 0.03392 0.03392 2.00 set 0.06784 0.03392 0.008 0.008 0.03392 2.00 set 0.06784 0.03392
-
0.00407 30.00 ttk 0.00407 - 0.00407 30.00 ttk 0.00407 - 0.00407 30.00 ttk 0.00407 -
0.010 0.09056 445.00 ttk 0.09056 - 0.09056 445.00 ttk 0.09056 - 0.09056 445.00 ttk 0.09056 -

0.009 0.009 0.01119 58.00 ttk 0.02164 0.01045 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.01791 58.00 ttk 0.02164 0.00373 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.01791 58.00 ttk 0.02164 0.00373 0.00062 0.00062 0.00062 0.00062 0.00062 0.00062
0.01085 4.00 ttk 0.01085 - 0.01085 4.00 ttk 0.01085 - 0.01085 4.00 ttk 0.01085 -
0.02544 10.00 ttk 0.02544 - 0.02544 10.00 ttk 0.02544 - 0.02544 10.00 ttk 0.02544 -
-
-
0.04884 24.00 bln 0.04884 - 0.04884 24.00 bln 0.04884 - 0.04884 24.00 bln 0.04884 -
0.38683 720.00 oh 0.38683 - 0.38683 720.00 oh 0.38683 - 0.38683 720.00 oh 0.38683 -
-
0.05768 108.00 m2 0.06922 0.01154 0.05768 108.00 m2 0.06922 0.01154 0.05768 108.00 m2 0.06922 0.01154
0.00391 4.00 m2 0.00391 - 0.00391 4.00 m2 0.00391 - 0.00391 4.00 m2 0.00391 -
0.03392 1.00 set 0.03392 - 0.03392 1.00 set 0.03392 - 0.03392 1.00 set 0.03392 -
-
-
-
0.06784 1.00 pkt 0.13567 0.06784 0.06784 1.00 pkt 0.13567 0.06784 0.06784 1.00 pkt 0.13567 0.06784
0.80467 3,920.00 m2 0.80467 - 0.80467 3,920.00 m2 0.80467 - 0.80467 3,920.00 m2 0.80467 -
0.20200 14.00 ttk 0.20200 - 0.20200 14.00 ttk 0.20200 - 0.20200 14.00 ttk 0.20200 -
-
-
-
0.27989 71,138.20 m2 0.27989 - 0.27989 71,138.20 m2 0.27989 - 0.27989 71,138.20 m2 0.27989 -
0.69577 1,920.00 m2 0.69577 - 0.69577 1,920.00 m2 0.69577 - 0.69577 1,920.00 m2 0.69577 -
-
4.04643 12,500.00 m2 4.04643 - 4.04643 12,500.00 m2 4.04643 - 4.04643 12,500.00 m2 4.04643 -
-
-
0.75165 37,946.70 m2 0.75165 - 0.67348 34,000.00 m2 0.67348 - 0.67348 34,000.00 m2 0.67348 -
0.02410 3,946.70 m2 0.02410 - 0.02410 3,946.70 m2 0.02410 -
0.323 0.323 0.323 22.03483 154,783.87 m3 22.13390 0.09906 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 22.09518 158,452.59 m3 22.65852 0.56334 0.141 0.141 0.141 0.141 22.09518 158,452.59 m3 22.65852 0.56334 0.094 0.094 0.094 0.094 0.094 0.094
0.117 0.117 0.117 0.117 0.97449 7,413.95 m3 1.39514 0.42065 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 1.29194 8,207.00 m3 1.54437 0.25243 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 1.29194 8,207.00 m3 1.54437 0.25243 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028
1.96005 31,751.49 m3 1.96005 - 1.96005 31,751.49 m3 1.96005 - 1.96005 31,751.49 m3 1.96005 -
0.74956 31,751.49 m3 0.74956 - 0.74956 31,751.49 m3 0.74956 - 0.74956 31,751.49 m3 0.74956 -
-
-
0.091 0.091 0.091 0.091 7.57142 3,362.40 m' 7.80350 0.23208 0.046 0.046 0.046 0.046 0.046 4.64162 2,000.00 m' 4.64162 - 4.64162 2,000.00 m' 4.64162 -
2.69053 1,362.40 m' 2.69053 - 2.69053 1,362.40 m' 2.69053 -
-
-
0.94368 15,287.04 m3 0.94368 - 0.35187 5,700.00 m3 0.35187 - 0.35187 5,700.00 m3 0.35187 -
0.46305 9,587.04 m3 0.46305 - 0.46305 9,587.04 m3 0.46305 -
0.58344 1,488.54 m3 0.58344 - 0.58344 1,488.54 m3 0.58344 - 0.58344 1,488.54 m3 0.58344 -
0.89163 744.27 m2 0.89163 - 0.89163 744.27 m2 0.89163 - 0.89163 744.27 m2 0.89163 -
12.84648 9,930.52 m3 12.84648 - 12.84648 9,930.52 m3 12.84648 - 12.84648 9,930.52 m3 12.84648 -
15.65555 830,160.18 kg 15.65555 - 15.65555 830,160.18 kg 15.65555 - 15.65555 830,160.18 kg 15.65555 -
0.17237 744.27 m3 0.17237 - 0.17237 744.27 m3 0.17237 - 0.17237 744.27 m3 0.17237 -
11.53941 21,675.20 m2 11.53941 - 11.53941 21,675.20 m2 11.53941 - 11.53941 21,675.20 m2 11.53941 -
-
-
-
-
0.054 - 324.00 ton 0.39439 0.39439 - 324.00 ton 0.39439 0.39439 0.131 0.131 0.131 - 324.00 ton 0.39439 0.39439 0.131 0.131 0.131
- ttk - - ttk - - - ttk 0.00000 -
- btg - - btg - - - btg 0.00000 -
0.131 0.131 0.131 - 4,834.00 btg 0.39154 0.39154 0.39154 4,834.00 btg 0.39154 - 0.39154 4,834.00 btg 0.39154 -
-
-
- m3 - - m3 - - - m3 0.00000 -
- m'sp - - m'sp - - - m'sp 0.00000 -
- msp - - msp - - - msp 0.00000 -
- msp - - msp - - - msp 0.00000 -
- titik - - titik - - - titik 0.00000 -
-
-
-
- 30.00 buah 0.03449 0.03449 - 30.00 buah 0.03449 0.03449 0.034 - 30.00 buah 0.03449 0.03449 0.011 0.011 0.011
- 1.00 set 0.00184 0.00184 - 1.00 set 0.00184 0.00184 0.002 - 1.00 set 0.00184 0.00184 0.001 0.001 0.001
4.76292 3,000.00 m' 4.76292 - 4.76292 3,000.00 m' 4.76292 - 4.76292 3,000.00 m' 4.76292 -
-
-
-
-
-
-
-
-
-
-
-
-
-
0.00522 84.49 m3 0.00522 - - - m3 0.00000 - - - m3 0.00000 -
0.00408 84.49 m3 0.00408 - 0.00408 84.49 m3 0.00408 -
0.00411 10.49 m3 0.00411 - 0.00411 10.49 m3 0.00411 - 0.00411 10.49 m3 0.00411 -
0.00743 6.20 m3 0.00743 - 0.00743 6.20 m3 0.00743 - 0.00743 6.20 m3 0.00743 -
0.06632 45.66 m3 0.06632 - 0.06632 45.66 m3 0.06632 - 0.06632 45.66 m3 0.06632 -
0.10274 5,447.89 kg 0.10274 - 0.10274 5,447.89 kg 0.10274 - 0.10274 5,447.89 kg 0.10274 -
0.00144 6.20 m3 0.00144 - 0.00144 6.20 m3 0.00144 - 0.00144 6.20 m3 0.00144 -
0.00750 64.35 m3 0.00750 - 0.00750 64.35 m3 0.00750 - 0.00750 64.35 m3 0.00750 -
0.12668 237.96 m2 0.12668 - 0.12668 237.96 m2 0.12668 - 0.12668 237.96 m2 0.12668 -
-
-
0.14901 2,413.94 m3 0.14901 - 0.12225 1,980.43 m3 0.12225 - 0.12225 1,980.43 m3 0.12225 -
0.02094 433.51 m3 0.02094 - 0.02094 433.51 m3 0.02094 -
0.05436 138.68 m3 0.05436 - 0.05436 138.68 m3 0.05436 - 0.05436 138.68 m3 0.05436 -
0.08307 69.34 m3 0.08307 - 0.08307 69.34 m3 0.08307 - 0.08307 69.34 m3 0.08307 -
1.24447 856.70 m3 1.24447 - 1.24447 856.70 m3 1.24447 - 1.24447 856.70 m3 1.24447 -
2.24793 119,199.98 kg 2.24793 - 2.24793 119,199.98 kg 2.24793 - 2.24793 119,199.98 kg 2.24793 -
0.01606 69.34 m3 0.01606 - 0.01606 69.34 m3 0.01606 - 0.01606 69.34 m3 0.01606 -
0.12263 1,052.25 m3 0.12263 - 0.12263 1,052.25 m3 0.12263 - 0.12263 1,052.25 m3 0.12263 -
1.82718 3,432.11 m2 1.82718 - 1.82718 3,432.11 m2 1.82718 - 1.82718 3,432.11 m2 1.82718 -
-
-
0.00976 158.08 m3 0.00976 - - - m3 0.00000 - - - m3 0.00000 -
0.00764 158.08 m3 0.00764 - 0.00764 158.08 m3 0.00764 -
0.00499 12.74 m3 0.00499 - 0.00499 12.74 m3 0.00499 - 0.00499 12.74 m3 0.00499 -
0.00763 6.37 m3 0.00763 - 0.00763 6.37 m3 0.00763 - 0.00763 6.37 m3 0.00763 -
0.18447 126.99 m3 0.18447 - 0.18447 126.99 m3 0.18447 - 0.18447 126.99 m3 0.18447 -
0.34095 18,079.49 kg 0.34095 - 0.34095 18,079.49 kg 0.34095 - 0.34095 18,079.49 kg 0.34095 -
0.00148 6.37 m3 0.00148 - 0.00148 6.37 m3 0.00148 - 0.00148 6.37 m3 0.00148 -
0.02341 200.85 m3 0.02341 - 0.02341 200.85 m3 0.02341 - 0.02341 200.85 m3 0.02341 -
0.20659 388.05 m2 0.20659 - 0.20659 388.05 m2 0.20659 - 0.20659 388.05 m2 0.20659 -
-
-
-
0.02598 420.86 m3 0.02598 - - - m3 0.00000 - - - m3 0.00000 -
0.02033 420.86 m3 0.02033 - 0.02033 420.86 m3 0.02033 -
0.01587 40.48 m3 0.01587 - 0.01587 40.48 m3 0.01587 - 0.01587 40.48 m3 0.01587 -
0.02425 20.24 m3 0.02425 - 0.02425 20.24 m3 0.02425 - 0.02425 20.24 m3 0.02425 -
0.46958 323.26 m3 0.46958 - 0.46958 323.26 m3 0.46958 - 0.46958 323.26 m3 0.46958 -
0.71301 37,808.67 kg 0.71301 - 0.71301 37,808.67 kg 0.71301 - 0.71301 37,808.67 kg 0.71301 -
0.00469 20.24 m3 0.00469 - 0.00469 20.24 m3 0.00469 - 0.00469 20.24 m3 0.00469 -
0.03961 339.90 m3 0.03961 - 0.03961 339.90 m3 0.03961 - 0.03961 339.90 m3 0.03961 -
0.43262 812.61 m2 0.43262 - 0.43262 812.61 m2 0.43262 - 0.43262 812.61 m2 0.43262 -
-
-
0.02266 367.08 m3 0.02266 - - - m3 0.00000 - - - m3 0.00000 -
0.01773 367.08 m3 0.01773 - 0.01773 367.08 m3 0.01773 -
0.00779 19.88 m3 0.00779 - 0.00779 19.88 m3 0.00779 - 0.00779 19.88 m3 0.00779 -
0.01191 9.94 m3 0.01191 - 0.01191 9.94 m3 0.01191 - 0.01191 9.94 m3 0.01191 -
0.29794 205.10 m3 0.29794 - 0.29794 205.10 m3 0.29794 - 0.29794 205.10 m3 0.29794 -
0.49150 26,062.73 kg 0.49150 - 0.49150 26,062.73 kg 0.49150 - 0.49150 26,062.73 kg 0.49150 -
0.00230 9.94 m3 0.00230 - 0.00230 9.94 m3 0.00230 - 0.00230 9.94 m3 0.00230 -
0.01260 108.15 m3 0.01260 - 0.01260 108.15 m3 0.01260 - 0.01260 108.15 m3 0.01260 -
0.33991 638.47 m2 0.33991 - 0.33991 638.47 m2 0.33991 - 0.33991 638.47 m2 0.33991 -
-
0.03462 54.00 m3 0.03462 - 0.03462 54.00 m3 0.03462 - 0.03462 54.00 m3 0.03462 -
-
-
-
-

0.53125 0.53125 0.68090 0.34754 0.18406 BOBOT S/D 100.000 1.69779 0.05137 0.05137 0.05137 0.05137 0.05137 0.00495 0.00495 0.00550 0.00550 0.00550 0.03355 0.03355 0.03355 0.03355 0.03355 0.03355 0.03355 0.03355 BOBOT S/D 100.000 1.36351 0.03155 0.03155 0.17239 0.17239 0.17286 0.17286 0.16348 0.16348 0.13193 0.00047 0.00047 0.00047 0.00848 0.04481 BOBOT S/D 100.000 1.36351 0.02805 0.12194 0.12194 0.12194 0.12194 0.12194 0.12194 0.15951 0.16013 0.13209 0.00062 0.00062 0.01273 0.01273 0.01211 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
MGG 118 98.20211 MGG 136 99.31034 MGG 150 98.63649
96.96112 97.49237 98.17327 98.52081 98.70487 KONTRAK 98.30221 98.35358 98.40495 98.45632 98.50769 98.55905 98.56401 98.56896 98.57446 98.57997 98.58547 98.61902 98.65256 98.68611 98.71966 98.75320 98.78675 98.82030 98.85384 ADEDNDUM 7 98.63649 98.66804 98.69959 98.87198 99.04437 99.21723 99.39008 99.55357 99.71705 99.84898 99.84945 99.84991 99.85038 99.85886 99.90367 ADEDNDUM 8 98.63649 98.66453 98.78647 98.90841 99.03035 99.15229 99.27422 99.39616 99.55567 99.71581 99.84789 99.84851 99.84913 99.86187 99.87460 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671
ADD 5
0.40787 0.47513 0.53053 0.36233 0.09648 BOBOT S/D 0.22048 0.15976 0.17116 0.05062 0.12554 0.06852 0.06035 0.06520 0.0000 0.00485 0.08164 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 BOBOT S/D 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 BOBOT S/D
MGG 118 98.30221 MGG 136 98.63649 MGG 150 98.63649
96.73764 97.21277 97.74330 98.10563 98.20211 ADEDNDUM 7 98.30221 98.52269 98.68245 98.85361 98.90423 99.02978 99.09830 99.15865 99.22385 99.22385 99.22870 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 ADEDNDUM 8 98.63649 98.63649 98.63649 98.63649 98.63649 98.63649 98.63649 98.63649 98.63649 98.63649 98.63649 98.63649 98.63649 98.63649 98.63649 ADEDNDUM 9 100.00000

-0.15675 -0.24623 -0.42997 -0.41518 -0.50276 DEVIASI (0.10010) 0.16911 0.27750 0.39729 0.39655 0.47072 0.53429 0.58968 0.64938 0.64388 0.64323 0.69133 0.65778 0.62423 0.59069 0.55714 0.52359 0.49005 0.45650 DEVIASI 0.67386 DEVIASI -

KONTR
PT. DWIF
KET
MINGGU 176 MINGGU 177 MINGGU 178 MINGGU 179 MINGGU 180 MINGGU 181 MINGGU 182 MINGGU 183 MINGGU 184 MINGGU 185 MINGGU 186 MINGGU 187 MINGGU 188 MINGGU 189 MINGGU 190 MINGGU 191 MINGGU 192 MINGGU 193 MINGGU 194 MINGGU 195 MINGGU 196 MINGGU 197 MINGGU 198 MINGGU 199 MINGGU 200 MINGGU 201 MINGGU 202 MINGGU 203 MINGGU 204
11/01/2021 18/01/2021 25/01/2021 01/02/2021 08/02/2021 15/02/2021 22/02/2021 01/03/2021 08/03/2021 15/03/2021 22/03/2021 29/03/2021 05/04/2021 12/04/2021 19/04/2021 26/04/2021 03/05/2021 10/05/2021 17/05/2021 24/05/2021 31/05/2021 07/06/2021 14/06/2021 21/06/2021 28/06/2021 05/07/2021 12/07/2021 19/07/2021 26/07/2021
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
17/01/2021 24/01/2021 31/01/2021 07/02/2021 14/02/2021 21/02/2021 28/02/2021 07/03/2021 14/03/2021 21/03/2021 28/03/2021 04/04/2021 11/04/2021 18/04/2021 25/04/2021 02/05/2021 09/05/2021 16/05/2021 23/05/2021 30/05/2021 06/06/2021 13/06/2021 20/06/2021 27/06/2021 04/07/2021 11/07/2021 18/07/2021 25/07/2021 31/07/2021

0.011 0.011 0.011

0.006 0.006

0.034 0.034

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.01131 0.01131 0.05099 0.03969

99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.89802 99.90932 99.96031 100.00000

Dibuat Oleh
KONTRAKTOR PELAKSANA
PT. DWIFARITA FAJARKHARISMA

Basuki Setyawan, ST
Site Manager
VOLUME MINGGU
SATUAN BOBOT (%) SKALA MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 11 ADD KONTRAK BOBOT MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20 MINGGU 21 MINGGU 22 MINGGU 23 MINGGU 24 MINGGU 25 MINGGU 26 MINGGU 27 MINGGU 28 MINGGU 29 MINGGU 30 MINGGU 31 MINGGU 32 MINGGU 33 MINGGU 34 ADD KONTRAK
Uraian Sub Output / Sub Output 10
REALISASI S.D
Komponen Sub Komponen Detail 04/09/2017 11/09/2017 18/09/2017 25/09/2017 02/10/2017 09/10/2017 16/10/2017 23/10/2017 30/10/2017 06/11/2017 13/11/2017 REALISASI S.D MINGGU 11 VOLUME ACTUAL SISA 20/11/2017 27/11/2017 04/12/2017 11/12/2017 18/12/2017 25/12/2017 01/01/2018 08/01/2018 15/01/2018 22/01/2018 29/01/2018 05/02/2018 12/02/2018 19/02/2018 26/02/2018 05/03/2018 12/03/2018 19/03/2018 26/03/2018 02/04/2018 09/04/2018 16/04/2018 23/04/2018 VOLUME ACTUAL
MINGGU 34
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT
10/09/2017 17/09/2017 24/09/2017 01/10/2017 08/10/2017 15/10/2017 22/10/2017 29/10/2017 05/11/2017 12/11/2017 19/11/2017 26/11/2017 03/12/2017 10/12/2017 17/12/2017 24/12/2017 31/12/2017 07/01/2018 14/01/2018 21/01/2018 28/01/2018 04/02/2018 11/02/2018 18/02/2018 25/02/2018 04/03/2018 11/03/2018 18/03/2018 25/03/2018 01/04/2018 08/04/2018 15/04/2018 22/04/2018 29/04/2018

UMUM

1.1. DESAIN, SURVEI, DAN PERIJINAN


100
1.1.1. DESAIN, SURVEI, DAN PERIJINAN
1 Pengukuran topography m2 90,000.00 0.25443 0.0688 0.0688 0.0688 0.0688 0.07464 90,000.00 m2 0.2544 0.1798 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.00195 0.19787 90,000.00 m2 0.25443
2 Pembuatan shop drawing dan asbuilt drawing set 2.00 0.06425 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.00869 2.00 set 0.0642 0.0556 0.03212 2.00 set 0.06425

3 Penyelidikan tanah
a. DCP ttk 30.00 0.00385 0.00008 0.00008 0.00008 0.00412 30.00 ttk 0.0039 - 0.0003 - 0.00009 - 0.00009 - 0.00009 0.00385 30.00 ttk 0.00385
b. Sand Cone ttk 445.00 0.08577 0.00164 0.00164 0.00164 - 445.00 ttk 0.0858 0.0858 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.00179 0.02679 400.00 ttk 0.07710
c. Plat Bearing ttk 60.00 0.02120 0.00045 0.00045 0.00045 - 60.00 ttk 0.0212 0.0212 - 60.00 ttk 0.02120
d. Penyelidikan sampel quarry ttk 6.00 0.01542 0.0042 0.0042 0.0042 0.0042 0.00556 6.00 ttk 0.0154 0.0099 0.00164 0.00164 0.00164 0.00164 0.00164 0.00164 0.00514 6.00 ttk 0.01542
e. Soundering test ttk 10.00 0.02409 ttk 0.02409 10.00 ttk 0.02409
1.2. MANAJEMEN LAPANGAN
1.2.1. ADMINISTRASI LAPANGAN
1 Dokumentasi bln 24.00 0.04626 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00491 24.00 bln 0.0463 0.0414 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.01371 24.00 bln 0.04626
2 Jaga malam,peralatan kerja dan mesin - mesin oh 720.00 0.36638 - 720.00 oh 0.3664 0.3664 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.00398 0.12111 720.00 oh 0.36638
1.2.2. OPERASIONAL KANTOR LAPANGAN
1 Membuat dan membongkar direksi keet, los kerja, dan guda m2 108.00 0.06556 0.0177 0.0177 0.05914 108.00 m2 0.0656 0.0064 0.05463 108.00 m2 0.06556
2 Papan nama pekerjaan m2 4.00 0.00370 0.0040 0.00401 4.00 m2 0.0037 - 0.00031 - 0.00031 0.00370 4.00 m2 0.00370
3 Operasional direksikeet set 1.00 0.03212 0.0348 0.02608 1.00 set 0.0321 0.0060 0.03212 1.00 set 0.03212

1.3. MOBILISASI DAN DEMOBILISASI


1.3.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
1 Mobilisasi dan demobilisasi Peralatan Berat pkt 1.00 0.12850 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.06954 1.00 pkt 0.1285 0.0590 0.0642 1.00 pkt 0.12850
2 Perbaikan jalan akses masyarakat m2 3,920.00 0.76212 - 3,920.00 m2 0.7621 0.7621 - 3,600.00 m2 0.69991
3. Relokasi tiang PLN ttk 14.00 0.19132 14.00 ttk 0.1913 0.1913 0.0957 0.0957 0.1913 14.00 ttk 0.19132
JALUR DAN BANGUNAN
2.1. SIPIL

2.1.1 Pekerjaan Persiapan


1 Pembersihan lapangan dan perataan m2 71,138.20 0.26509 0.0465 0.0465 0.0465 0.28694 71,138.20 m2 0.2651 - 0.0218 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 - 0.00273 0.26509 71138.2008 m2 0.26509
2 Pembongkaran bangunan m2 1,920.00 0.65899 1,920.00 m2 0.6590 0.6590 0.16475 0.16475 0.16475 0.16475 0.65899 1920.00 m2 0.65899
2.1.2. PERBAIKAN TANAH DASAR
1 Perkuatan dengan geotekstile m2 12,500.00 3.83249 0.1106 0.1106 0.1106 - 12,500.00 m2 3.8325 3.8325 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 0.1533 2.91269 12,500.00 m2 3.83249

2.1.2. KONSTRUKSI TUBUH BAAN


1 Stripping / pengupasan lapisan tanah dasar mak 50cm m2 37,946.70 0.71191 0.0197 0.0197 0.0197 0.56679 37,946.70 m2 0.7119 0.1451 0.1451 0.52363 27,910.93 m2 0.52363
1a Stripping / pengupasan lapisan tanah dasar mak 50cm
2 Timbunan dengan material tanah pilihan m3 154,783.87 20.96365 0.30599 0.30599 0.30599 0.51310 154,783.87 m3 20.9637 20.4506 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 0.39328 13.58909 155,308.556 m3 21.03472
3 Timbunan dengan sirtu (sub balas) m3 8,214.25 1.46401 - 8,214.25 m3 1.4640 1.4640 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 0.0311 - 8,214.25 m3 1.46401
70
4 Galian tanah dengan alat berat m3 31,751.49 1.85642 0.2325 0.2325 0.2325 0.07229 31,751.49 m3 1.8564 1.7841 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.0446 0.92255 36,035.35 m3 2.10688
5 Membuang Tanah sejauh 30 m m3 31,751.49 0.70993 0.0889 0.0889 0.0889 0.01075 31,751.49 m3 0.7099 0.6992 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.0171 0.34888 36,035.35 m3 0.80571

2.1.2. DRAINASE
1 Drainase beton pracetak 80x80 cm tebal 10 cm m' 3,362.40 7.39092 - 3,362.40 m' 7.3909 7.3909 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 0.1320 - 3,351.00 m' 7.36586
1a Drainase beton pracetak 80x80 cm tebal 10 cm

2 Retaining wall
Galian Tanah m3 15,287.04 0.89379 - 15,287.04 m3 0.8938 0.8938 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.27922 15,004.76 m3 0.87729
Galian Tanah
Pasangan batu kosong m3 1,488.54 0.55260 - 1,488.54 m3 0.5526 0.5526 0.0089 0.0089 0.0089 0.0089 0.0089 0.0089 0.31404 1,436.76 m3 0.53337
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m2 744.27 0.84449 - 744.27 m2 0.8445 0.8445 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.43022 718.38 m2 0.81511
Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 m3 9,930.52 12.16727 - 9,930.52 m3 12.1673 12.1673 0.1962 0.1962 0.1962 0.1962 0.1962 0.1962 3.15151 9,520.03 m3 11.66433
Pembesian dengan besi ulir m3 830,160.18 14.82782 - 830,160.18 m3 14.8278 14.8278 0.2392 0.2392 0.2392 0.2392 0.2392 0.2392 6.32121 809,155.34 kg 14.45265
Urugan pasir m3 744.27 0.16325 - 744.27 m3 0.1633 0.1633 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.08317 718.38 m3 0.15758
Bekisting m2 21,675.20 10.92931 - 21,675.20 m2 10.9293 10.9293 0.1763 0.1763 0.1763 0.1763 0.1763 0.1763 2.43521 20,652.24 m2 10.41350

2.2 JALAN REL


2.2.1. MATERIAL JALAN KA
1 Angkutan rel ton 324.00 0.37354 - 324.00 ton 0.3735 0.3735 - 324.00 ton 0.37354
2 Bantalan Kayu untuk MJ lengkap dengan aksesoris ttk 40.00 0.50863 - 40.00 ttk 0.5086 0.5086 - 40.00 ttk 0.50863

3 Ecer Bantalan Beton Beserta alat penambat btg 4,834.00 0.23169 - 4,834.00 btg 0.2317 0.2317 - 4834.00 btg 0.23169
4 Angkutan Bantalan Beton Lengkap Dengan Alat Penambat Elastis /btg btg 4,834.00 0.37084

2.2.2. KONSTRUKSI JALAN KA


1 Pengadaan dan pengeceran balas m3 4,785.00 2.1631 - 4,785.00 m3 2.1631 2.1631 - 4785.00 m3 2.16311
2 Pemasangan track R.54 dengan pemecokan awal m'sp 2,900.00 0.8657 - 2,900.00 m'sp 0.8657 0.8657 - 2900.00 m'sp 0.86566
3 MTT msp 2,900.00 0.4923 - 2,900.00 msp 0.4923 0.4923 - 2900.00 msp 0.49227
4 PBR msp 2,900.00 0.0261 - 2,900.00 msp 0.0261 0.0261 - 2900.00 msp 0.02609
5 Pengelasan flash butt R.54 titik 192.00 0.8512 - 192.00 titik 0.8512 0.8512 - 192.00 titik 0.85118

2.3. PENDUKUNG JALUR DAN BANGUNAN


2.3.1. PAPAN INFORMASI KONSTRUKSI
50
1 Patok KM-HM buah 30.00 0.0327 - 30.00 buah 0.0327 0.0327 - 30.00 buah 0.03266
2 Tanda-tanda lintas set 1.00 0.0017 - 1.00 set 0.0017 0.0017 - 1.00 set 0.00175
3 Pemasangan pagar sterilisasi panel beton t=120 cm m' 3,000.00 4.5111 - 3,000.00 m' 4.5111 4.5111 0.09398 0.09398 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 0.0940 4.51110 3,000.00 m' 4.51110
50

2.7. JEMBATAN

1 Underpass akses masyarakat uk. 6x5,5 (2 unit)


2 Box Culvert uk. 4x4 (1 unit)
3 Jembatan Perlintasan Jalan Nasional
1. 'PEKERJAAN PONDASI
2. PEKERJAAN ABUTMEN
3. 'PEKERJAAN DECK
4. 'I GIRDER
5. 'BEARING
6. 'EXPANSION JOINT

Box Culvert uk. 1x1 (2 unit)


Galian Tanah m3 84.49 0.0049 - 84.49 m3 0.00494
a. Galian Tanah
Pasangan batu kosong m3 10.49 0.0039 - 6.60 m3 0.00245
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.20 0.0070 - 3.30 m3 0.00374
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 45.66 0.0628 - 80.48 m3 0.11073
Pembesian dengan besi ulir kg 5,447.89 0.0973 - 7,034.97 kg 0.12565
Urugan pasir m3 6.20 0.0014 - 3.30 m3 0.00072
Structural Backfill m3 64.35 0.0071 - 64.35 m3 0.00710
Bekisting m2 237.96 0.1200 - 347.64 m2 0.17529

Box Culvert Uk. 2x2 (12 unit)


Galian Tanah m3 2,413.94 0.1411 - 2,488.42 m3 0.14549
a. Galian Tanah
Pasangan batu kosong m3 138.68 0.0515 - 126.10 m3 0.04681
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 69.34 0.0787 - 63.05 m3 0.07154
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 856.70 1.1787 - 1,148.23 m3 1.57978
Pembesian dengan besi ulir kg 119,199.98 2.1291 - 124,190.18 kg 2.21821
Urugan pasir m3 69.34 0.0152 - 63.05 m3 0.01383
Structural Backfill m3 1,052.25 0.1161 REALISASI MINGGUAN - 1,109.44 m3 0.12246
Bekisting m2 3,432.11 1.7306 - 4,315.16 m2 2.17584

Underpass Warga 4x4 (1 unit)


Galian Tanah m3 158.08 0.0092 - 158.08 m3 0.00924
a. Galian Tanah
Pasangan batu kosong m3 12.74 0.0047 - 12.74 m3 0.00473
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 6.37 0.0072 - 6.37 m3 0.00723
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 126.99 0.1747 - 166.19 m3 0.22865
Pembesian dengan besi ulir kg 18,079.49 0.3229 - 19,806.47 kg 0.35377
Urugan pasir m3 6.37 0.0014 - 6.37 m3 0.00140
Structural Backfill m3 200.85 0.0222 - 200.85 m3 0.02217
Bekisting m2 388.05 0.1957 - 493.07 m2 0.24862

Box Culvert Uk. 4x4x2 (1 unit)


Galian Tanah m3 420.86 0.0246 - 420.86 m3 0.02461
a. Galian Tanah
Pasangan batu kosong m3 40.48 0.0150 - 40.48 m3 0.01503
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 20.24 0.0230 - 20.24 m3 0.02297
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 323.26 0.4448 - 346.40 m3 0.47660
Pembesian dengan besi ulir kg 37,808.67 0.6753 - 38,738.53 kg 0.69192
Urugan pasir m3 20.24 0.0044 - 20.24 m3 0.00444
Structural Backfill m3 339.90 0.0375 - 339.90 m3 0.03752
Bekisting m2 812.61 0.4097 - 1,005.77 m2 0.50714

Box Culvert Uk. 6x4x2 (1 unit)


Galian Tanah m3 367.08 0.0215 - 138.15 m3 0.00808
a. Galian Tanah
Pasangan batu kosong m3 19.88 0.0074 - 34.08 m3 0.01265
Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3 9.94 0.0113 RENCANA MINGGUAN - 17.04 m3 0.01933
Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 205.10 0.2822 - 352.28 m3 0.48468
Pembesian dengan besi ulir kg 26,062.73 0.4655 - 23,923.23 kg 0.42730
Urugan pasir m3 9.94 0.0022 - 17.04 m3 0.00374
Structural Backfill m3 108.15 0.0119 - 185.40 m3 0.02046
Bekisting m2 638.47 0.3219 - 1,071.23 m2 0.54015

1. Bobok Beton m3 54.00 0.0328

100.0000

BOBOT RENCANA MINGGUAN : 0.10408 0.13485 0.08233 0.08233 0.01766 0.01766 0.01766 0.01766 0.80689 0.80689 0.80689 BOBOT S/D MGG 11 KONTRAK 90.33051 88.62395 0.77159 0.62677 0.62677 0.62677 0.55768 0.55768 0.46038 0.61368 0.61641 0.61641 0.64756 0.64756 0.77945 0.77945 0.87343 0.87352 0.87352 1.52479 1.52479 1.52479 1.52479 1.52479 1.52479 BOBOT S/D MGG 100.00000
2.05980 34 KONTRAK ADD 40.05563
BOBOT KOMULATIF RENCANA MINGGUAN : 0.00000 0.10408 0.23893 0.32127 0.40360 0.42126 0.43892 0.45657 0.47423 1.28112 2.08800 2.89489 2.05980 2.83139 3.45815 4.08492 4.71169 5.26937 5.82705 6.28743 6.90111 7.51752 8.13393 8.78149 9.42904 10.20849 10.98795 11.86138 12.73490 13.60842 15.13320 16.65799 18.18278 19.70756 21.23235 22.75714 1

BOBOT REALISASI MINGGUAN : 0 0.00000 0.00089 0.00445 0.00289 0.02451 0.08435 0.10977 0.93832 0.19340 0.17848 0.52273 BOBOT S/D MGG 11 ADEDNDUM 14.72893 9.14805 4.14984 0.60500 0.224118367 0.004245882 0.004246088 0.114299523 0.238935138 0.17170 0.005913392 0.004250229 0.096288471 0.148066415 0.106703951 0.17744 0.90731 1.31701 1.30047 1.53812 1.00613 2.02172 0.00425 BOBOT S/D MGG
2.03259 34 ADEDNDUM 2 37.51733
BOBOT KOMULATIF REALISASI MINGGUAN : 0 0.00000 0.00089 0.00535 0.00824 0.03275 0.11710 0.22687 1.16519 1.35859 1.53707 2.05980 2.03259 16.76152 16.76152 25.90957 30.05941 30.66441 30.88853 30.89277 30.89702 31.01132 31.25025 31.42195 31.42786 31.43211 31.52840 31.67647 31.78317 31.96062 32.86793 34.18494 35.48541 37.02353 38.02966 40.05138 40.05563

DEVIASI : -0.10408 -0.23804 -0.31592 -0.39536 -0.38850 -0.32182 -0.22970 0.69096 0.07748 -0.55093 -0.83509 DEVIASI 0.02721 13.93013 22.45141 25.97449 25.95272 25.61916 25.06572 24.60959 24.11021 23.73273 23.28802 22.64638 22.00307 21.31991 20.68852 19.92179 19.22572 19.25951 19.05173 18.82742 18.84075 18.32209 18.81903 17.29849 DEVIASI 2.53830

Mengetahui
BALAI TEKNIK PERKERETAAPIAN
KELAS II WILAYAH SUMATERA BAGIAN UTARA
PEJABAT PEMBUAT KOMITMEN ACEH WILAYAH II

Teuku Defri
Koordinator Pengawas
WAKTU PELAKSAN
BOBOT MINGGU 35 MINGGU 36 MINGGU 37 MINGGU 38 MINGGU 39 MINGGU 40 MINGGU 41 MINGGU 42 MINGGU 43 MINGGU 44 MINGGU 45 MINGGU 46 MINGGU 47 MINGGU 48 MINGGU 49 MINGGU 50 MINGGU 51 MINGGU 52 MINGGU 53 MINGGU 54 MINGGU 55 MINGGU 56 MINGGU 57 MINGGU 58 MINGGU 59 MINGGU 60 MINGGU 61 MINGGU 62 MINGGU 63 MINGGU 64 MINGGU 65 MINGGU 66 MINGGU 67 MINGGU 68 MINGGU 69 MINGGU 70 MINGGU 71 MINGGU 72 MINGGU 73 MINGGU 74 MINGGU 75 MINGGU 76 MINGGU 77 MINGGU 78 MINGGU 79 MINGGU 80 MINGGU 81 MINGGU 82 MINGGU 83 MINGGU 84 ADD KONTRAK
REALISASI S.D
30/04/2018 07/05/2018 14/05/2018 21/05/2018 28/05/2018 04/06/2018 11/06/2018 18/06/2018 25/06/2018 02/07/2018 09/07/2018 16/07/2018 23/07/2018 30/07/2018 06/08/2018 13/08/2018 20/08/2018 27/08/2018 03/09/2018 10/09/2018 17/09/2018 24/09/2018 01/10/2018 08/10/2018 15/10/2018 22/10/2018 29/10/2018 05/11/2018 12/11/2018 19/11/2018 26/11/2018 03/12/2018 10/12/2018 17/12/2018 24/12/2018 31/12/2018 07/01/2019 14/01/2019 21/01/2019 28/01/2019 04/02/2019 11/02/2019 18/02/2019 25/02/2019 04/03/2019 11/03/2019 18/03/2019 25/03/2019 01/04/2019 08/04/2019 VOLUME ACTUAL
SISA MINGGU 84
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL
06/05/2018 13/05/2018 20/05/2018 27/05/2018 03/06/2018 10/06/2018 17/06/2018 24/06/2018 01/07/2018 08/07/2018 15/07/2018 22/07/2018 29/07/2018 05/08/2018 12/08/2018 19/08/2018 26/08/2018 02/09/2018 09/09/2018 16/09/2018 23/09/2018 30/09/2018 07/10/2018 14/10/2018 21/10/2018 28/10/2018 04/11/2018 11/11/2018 18/11/2018 25/11/2018 02/12/2018 09/12/2018 16/12/2018 23/12/2018 30/12/2018 06/01/2019 13/01/2019 20/01/2019 27/01/2019 03/02/2019 10/02/2019 17/02/2019 24/02/2019 03/03/2019 10/03/2019 17/03/2019 24/03/2019 31/03/2019 07/04/2019 14/04/2019

0.05656 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.25443 90,000.00
0.03212 0.03212 2.00

- 0.00385 30.00
0.05031 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.05031 445.00
0.02120 -
0.01028 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171 0.00514 6.00
- - 0.02409 10.00

0.03255 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.03466 24.00
0.24527 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.29921 720.00

0.01093 0.05463 108.00


- 0.00370 4.00
- 0.03212 1.00

0.06425 0.06425 1.00


0.69991 - 3,920.00
- 0.19132 14.00

- 0.26509 71,138.20
- 0.65899 1,920.00

0.91980 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 3.83249 12,500.00

- 0.52363 37,946.70

7.44562 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 18.89775 154,783.87
1.46401 - 8,214.25
1.18434 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 1.81417 31,751.49
0.45683 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.68985 31,751.49

7.36586 - - 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 5.61595 3,362.40

0.59807 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.78240 15,287.04

0.21933 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.40428 1,488.54
0.38488 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.69951 744.27
8.51281 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 8.79320 9,930.52
8.13144 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 13.12466 830,160.18
0.07441 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.11943 744.27
7.97829 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 7.92599 21,675.20

0.37354 - 324.00
0.50863 - 40.00
0.23169 - 4,834.00
- 4,834.00

2.16311 - 4,785.00
0.86566 - 2,900.00
0.49227 - 2,900.00
0.02609 - 2,900.00
0.85118 - 192.00

0.03266 - 30.00
0.00175 - 1.00
- 4.51110 3,000.00

0.00494 0.00247 0.00247 0.00269 84.49

0.00245 0.00245 0.00134 10.49


0.00374 0.00374 0.00204 6.20
0.11073 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.05269 45.66
0.12565 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.06301 5,447.89
0.00072 0.00072 0.00039 6.20
0.00710 0.00355 0.00355 0.00387 64.35
0.17529 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.08514 237.96

0.14549 0.03637 0.03637 0.03637 0.03637 0.11408 2,413.94

0.04681 0.00585 0.00585 0.00585 0.00585 0.00585 0.00585 0.00585 0.00585 0.04139 138.68
0.07154 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.06325 69.34
1.57978 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.94574 856.70
2.21821 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 1.71452 119,199.98
0.01383 0.00173 0.00173 0.00173 0.00173 0.00173 0.00173 0.00173 0.00173 0.01223 69.34
0.12246 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.09393 1,052.25
2.17584 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 1.38546 3,432.11

0.00924 0.00462 0.00462 0.00924 158.08

0.00473 0.00236 0.00236 0.00473 12.74


0.00723 0.00361 0.00361 0.00723 6.37
0.22865 0.05716 0.05716 0.05716 0.05716 0.17471 126.99
0.35377 0.08844 0.08844 0.08844 0.08844 0.32292 18,079.49
0.00140 0.00070 0.00070 0.00140 6.37
0.02217 0.00739 0.00739 0.00739 0.02217 200.85
0.24862 0.06215 0.06215 0.06215 0.06215 0.19567 388.05

0.02461 0.01230 0.01230 - 420.86

0.01503 0.00751 0.00751 - 40.48


0.02297 0.01148 0.01148 - 20.24
0.47660 0.11915 0.11915 0.11915 0.11915 - 323.26
0.69192 0.17298 0.17298 0.17298 0.17298 - 37,808.67
0.00444 0.00222 0.00222 - 20.24
0.03752 0.01251 0.01251 0.01251 - 339.90
0.50714 0.12679 0.12679 0.12679 0.12679 - 812.61

0.00808 0.00404 0.00404 - 367.08

0.01265 0.00633 0.00633 - 19.88


0.01933 0.00967 0.00967 - 9.94
0.48468 0.12117 0.12117 0.12117 0.12117 - 205.10
0.42730 0.10683 0.10683 0.10683 0.10683 - 26,062.73
0.00374 0.00187 0.00187 - 9.94
0.02046 0.00682 0.00682 0.00682 - 108.15
0.54015 0.13504 0.13504 0.13504 0.13504 - 638.47

- 54.00

62.48267 0.47096 0.47096 0.47096 0.47096 0.47096 0.47096 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.47171 0.47489 0.52445 0.52070 0.52070 0.52070 0.52070 0.52070 0.52070 0.52425 0.76081 0.75726 0.75726 0.75726 0.72089 0.72089 0.72089 0.72857 1.29466 1.28697 1.29075 1.29075 1.10503 1.52803 1.50089 1.96666 1.96666 1.55998 1.93242 1.92018 1.91734 1.91734 1.55430 1.54748 1.54748 BOBOT S/D MGG
84 KONTRAK ADD 75.02819
37.51733 37.98828 38.45924 38.93020 39.40115 39.87211 40.34307 40.81231 41.28155 41.75080 42.22004 42.68929 43.15853 43.62777 44.09702 44.56626 45.03797 45.51286 46.03731 46.55801 47.07871 47.59941 48.12012 48.64082 49.16152 49.68578 50.44659 51.20385 51.96111 52.71837 53.43925 54.16014 54.88103 55.60960 56.90426 58.19123 59.48198 60.77273 61.87776 63.40579 64.90668 66.87334 68.84000 70.39997 72.33239 74.25257 76.16990 78.08724 79.64154 81.18903 82.73651 3

1.23430 2.42714 1.61500 1.61087 1.50734 0.87979 0.00398 0.00398 1.68580 1.14925 0.59724 0.59723 1.63629 1.88968 2.32309 1.86242 0.96559 0.96972 0.09164 0.00976 0.72043 0.74694 0.61818 0.65034 0.61818 0.61973 1.16108 1.23422 0.62065 0.61818 0.61818 0.00647 0.00666 0.03382 0.00553 0.00554 0.00398 0.00398 0.00399 0.00399 0.00398 0.45119 1.65972 1.23218 1.56409 1.22361 0.00398 0.00399 0.00398 0.00398 BOBOT S/D MGG
84 ADEDNDUM 3 75.02819
37.51732749 38.75163 41.17876 42.79377 44.40464 45.91198 46.79177 46.79574 46.79973 48.48553 49.63478 50.23201 50.82925 52.46554 54.35521 56.67831 58.54073 59.50632 60.47604 60.56768 60.57744 61.29787 62.04481 62.66299 63.31332 63.93150 64.55124 65.71232 66.94653 67.56718 68.18536 68.80352 68.81000 68.81666 68.85048 68.85600 68.86155 68.86553 68.86950 68.87349 68.87749 68.88147 69.33266 70.99237 72.22455 73.78864 75.01225 75.01624 75.02023 75.02421 75.02819

0.76333 2.71951 3.86357 5.00349 6.03987 6.44871 5.98344 5.51818 6.73473 7.41474 7.54273 7.67072 8.83777 10.25820 12.11205 13.50276 13.99346 14.43873 14.00967 13.49873 13.69846 13.92469 14.02217 14.15180 14.24572 14.10465 14.50847 14.98543 14.84881 14.74610 14.64339 13.92897 13.20706 11.94622 10.66477 9.37956 8.09279 6.99174 5.46770 3.97081 2.00813 0.49266 0.59240 (0.10784) (0.46393) (1.15766) (3.07100) (4.62131) (6.16482) (7.70832) DEVIASI (0.00000)

Disetujui Oleh
KONSULTAN SUPERVISI
PT. HARAWANA CONSULTANT

John F Sitompul, ST
Team Leader
KTU PELAKSANAAN
ADD KONTRAK BOBOT MINGGU 85 MINGGU 86 MINGGU 87 MINGGU 88 MINGGU 89 MINGGU 90 MINGGU 91 MINGGU 92 MINGGU 93 MINGGU 94 MINGGU 95 MINGGU 96 MINGGU 97 MINGGU 98 MINGGU 99 ADD KONTRAK BOBOT MINGGU 100 MINGGU 101 MINGGU 102 MINGGU 103 MINGGU 104 MINGGU 105 MINGGU 106 MINGGU 107 MINGGU 108 MINGGU 109 MINGGU 110 MINGGU 111 MINGGU 112 MINGGU 113 ADD KONTRAK BOBOT MINGGU 114 MINGGU 115 MINGGU 116 MINGGU 117 MINGGU 118 ADD KONTRAK BOBOT
REALISASI
REALISASI S.D REALISASI S.D
VOLUME ACTUAL 15/04/2019 22/04/2019 29/04/2019 06/05/2019 13/05/2019 20/05/2019 27/05/2019 03/06/2019 10/06/2019 17/06/2019 24/06/2019 01/07/2019 08/07/2019 15/07/2019 22/07/2019 VOLUME ACTUAL 29/07/2019 05/08/2019 12/08/2019 19/08/2019 26/08/2019 02/09/2019 09/09/2019 16/09/2019 23/09/2019 30/09/2019 07/10/2019 14/10/2019 21/10/2019 28/10/2019 VOLUME ACTUAL 04/11/2019 11/11/2019 18/11/2019 25/11/2019 02/12/2019 S.D MINGGU VOLUME ACTUAL
SISA MINGGU 99 SISA MINGGU 113 SISA SISA
SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d 118 VOL SAT BOBOT
21/04/2019 28/04/2019 05/05/2019 12/05/2019 19/05/2019 26/05/2019 02/06/2019 09/06/2019 16/06/2019 23/06/2019 30/06/2019 07/07/2019 14/07/2019 21/07/2019 28/07/2019 04/08/2019 11/08/2019 18/08/2019 25/08/2019 01/09/2019 08/09/2019 15/09/2019 22/09/2019 29/09/2019 06/10/2019 13/10/2019 20/10/2019 27/10/2019 03/11/2019 10/11/2019 17/11/2019 24/11/2019 01/12/2019 08/12/2019

m2 0.25443 - - - 0.254 90,000.00 m2 0.254 - 0.269 90,000.00 m2 0.269 0.26863 90,000.00 m2 0.26863 -
set 0.06425 0.03212 0.032 2.00 set 0.064 0.032 0.034 2.00 set 0.068 0.034 0.03392 2.00 set 0.06784 0.03392
-
ttk 0.00385 - 0.004 30.00 ttk 0.004 - 0.004 30.00 ttk 0.004 - 0.00407 30.00 ttk 0.00407 -
ttk 0.08577 0.03547 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.0030 0.060 445.00 ttk 0.086 0.026 0.009 0.009 0.009 0.080 445.00 ttk 0.091 0.010 0.010 0.09056 445.00 ttk 0.09056 -
ttk 0.02120 0.02120 - - 0.0053 0.0053 0.0053 0.0053 0.004 60.00 ttk 0.021 0.018 0.004 58.00 ttk 0.022 0.018 0.009 0.009 0.01119 58.00 ttk 0.02164 0.01045
ttk 0.01542 0.01028 0.00514 0.00514 0.005 6.00 ttk 0.015 0.010 0.005 0.005 0.011 4.00 ttk 0.011 - 0.01085 4.00 ttk 0.01085 -
ttk 0.02409 - 0.024 10.00 ttk 0.024 - 0.025 10.00 ttk 0.025 - 0.02544 10.00 ttk 0.02544 -

bln 0.04626 0.01160 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.041 24.00 bln 0.046 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.049 24.00 bln 0.049 - 0.04884 24.00 bln 0.04884 -
oh 0.36638 0.06717 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.00354 0.353 720.00 oh 0.366 0.014 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.387 720.00 oh 0.387 - 0.38683 720.00 oh 0.38683 -

m2 0.06556 0.01093 0.055 108.00 m2 0.066 0.011 0.058 108.00 m2 0.069 0.012 0.05768 108.00 m2 0.06922 0.01154
m2 0.00370 - 0.004 4.00 m2 0.004 - 0.004 4.00 m2 0.004 - 0.00391 4.00 m2 0.00391 -
set 0.03212 - 0.032 1.00 set 0.032 - 0.034 1.00 set 0.034 - 0.03392 1.00 set 0.03392 -

pkt 0.12850 0.06425 0.064 1.00 pkt 0.128 0.064 0.068 1.00 pkt 0.136 0.068 0.06784 1.00 pkt 0.13567 0.06784
m2 0.76212 0.76212 - 3,920.00 m2 0.762 0.762 - 3,920.00 m2 0.805 0.805 0.80467 3,920.00 m2 0.80467 -
ttk 0.19132 - 0.191 14.00 ttk 0.191 - 0.202 14.00 ttk 0.202 - 0.20200 14.00 ttk 0.20200 -

m2 0.26509 - 0.265 71,138.20 m2 0.265 - 0.280 71,138.20 m2 0.280 - 0.27989 71,138.20 m2 0.27989 -
m2 0.65899 - 0.659 1,920.00 m2 0.659 - 0.696 1,920.00 m2 0.696 - 0.69577 1,920.00 m2 0.69577 -

m2 3.83249 - 3.832 12,500.00 m2 3.832 - 4.046 12,500.00 m2 4.046 - 4.04643 12,500.00 m2 4.04643 -

m2 0.71191 0.18828 0.03766 0.03766 0.03766 0.03766 0.03766 0.712 37,946.70 m2 0.712 - 0.752 37,946.70 m2 0.752 - 0.75165 37,946.70 m2 0.75165 -

m3 20.96365 2.06590 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 0.2066 18.898 154,783.87 m3 20.964 2.066 0.258 0.258 0.258 0.258 0.258 0.258 0.258 21.164 154,783.87 m3 22.134 0.970 0.323 0.323 0.323 22.03483 154,783.87 m3 22.13390 0.09906
m3 1.46401 1.46401 0.4880 0.4880 0.4880 0.878 8,214.25 m3 1.464 0.586 0.146 0.146 0.927 7,413.95 m3 1.395 0.468 0.117 0.117 0.117 0.117 0.97449 7,413.95 m3 1.39514 0.42065
m3 1.85642 0.04225 0.0070 0.0070 0.0070 0.0070 0.0070 0.0070 1.856 31,751.49 m3 1.856 - 1.960 31,751.49 m3 1.960 - 1.96005 31,751.49 m3 1.96005 -
m3 0.70993 0.02008 0.0033 0.0033 0.0033 0.0033 0.0033 0.0033 0.710 31,751.49 m3 0.710 - 0.750 31,751.49 m3 0.750 - 0.74956 31,751.49 m3 0.74956 -

m' 7.39092 1.77497 0.8875 0.8875 6.606 3,362.40 m' 7.391 0.785 7.439 3,362.40 m' 7.803 0.365 0.091 0.091 0.091 0.091 7.57142 3,362.40 m' 7.80350 0.23208

m3 0.89379 0.11139 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.0159 0.894 15,287.04 m3 0.894 - 0.944 15,287.04 m3 0.944 - 0.94368 15,287.04 m3 0.94368 -

m3 0.55260 0.14832 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.0212 0.492 1,488.54 m3 0.553 0.061 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.583 1,488.54 m3 0.583 - 0.58344 1,488.54 m3 0.58344 -
m2 0.84449 0.14497 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.0181 0.833 744.27 m2 0.844 0.012 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.892 744.27 m2 0.892 - 0.89163 744.27 m2 0.89163 -
m3 12.16727 3.37407 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 0.2812 10.640 9,930.52 m3 12.167 1.527 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 0.109 12.846 9,930.52 m3 12.846 - 12.84648 9,930.52 m3 12.84648 -
kg 14.82782 1.70316 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 0.1419 14.766 830,160.18 kg 14.828 0.062 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 15.656 830,160.18 kg 15.656 - 15.65555 830,160.18 kg 15.65555 -
m3 0.16325 0.04382 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.0055 0.161 744.27 m3 0.163 0.002 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.172 744.27 m3 0.172 - 0.17237 744.27 m3 0.17237 -
m2 10.92931 3.00332 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.2503 0.4378 0.1565 0.15651 9.648 21,675.20 m2 10.929 1.281 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 11.539 21,675.20 m2 11.539 - 11.53941 21,675.20 m2 11.53941 -

ton 0.37354 0.37354 0.18677 - 324.00 ton 0.374 0.374 - 324.00 ton 0.394 0.394 0.054 - 324.00 ton 0.39439 0.39439
ttk 0.50863 0.50863 0.25431 - 40.00 ttk 0.509 0.509 - - ttk 0.000 - - ttk - -

btg 0.23169 0.23169 0.11585 - 4,834.00 btg 0.232 0.232 - - btg 0.000 - - btg - -

btg 0.37084 0.37084 0.18542 - 4,834.00 btg 0.371 0.371 - 4,834.00 btg 0.392 0.392 0.131 0.131 0.131 - 4,834.00 btg 0.39154 0.39154

m3 2.16311 2.16311 0.54078 - 4,785.00 m3 2.163 2.163 - - m3 0.000 - - m3 - -


m'sp 0.86566 0.86566 - 2,900.00 m'sp 0.866 0.866 - - m'sp 0.000 - - m'sp - -
msp 0.49227 0.49227 - 2,900.00 msp 0.492 0.492 - - msp 0.000 - - msp - -
msp 0.02609 0.02609 - 2,900.00 msp 0.026 0.026 - - msp 0.000 - - msp - -
titik 0.85118 0.85118 - 192.00 titik 0.851 0.851 - - titik 0.000 - - titik - -

buah 0.03266 0.03266 - 30.00 buah 0.033 0.033 - 30.00 buah 0.034 0.034 - 30.00 buah 0.03449 0.03449
set 0.00175 0.00175 - 1.00 set 0.002 0.002 - 1.00 set 0.002 0.002 - 1.00 set 0.00184 0.00184
m' 4.51110 - 4.511 3,000.00 m' 4.511 - 4.763 3,000.00 m' 4.763 - 4.76292 3,000.00 m' 4.76292 -

m3 0.00494 0.00225 0.00225 0.005 84.49 m3 0.005 - 0.005 84.49 m3 0.005 - 0.00522 84.49 m3 0.00522 -

m3 0.00389 0.00256 0.00256 0.004 10.49 m3 0.004 - 0.004 10.49 m3 0.004 - 0.00411 10.49 m3 0.00411 -
m3 0.00704 0.00500 0.00500 0.007 6.20 m3 0.007 - 0.007 6.20 m3 0.007 - 0.00743 6.20 m3 0.00743 -
m3 0.06282 0.01012 0.00506 0.00506 0.063 45.66 m3 0.063 - 0.066 45.66 m3 0.066 - 0.06632 45.66 m3 0.06632 -
kg 0.09731 0.03430 0.01715 0.01715 0.097 5,447.89 kg 0.097 - 0.103 5,447.89 kg 0.103 - 0.10274 5,447.89 kg 0.10274 -
m3 0.00136 0.00097 0.00097 0.001 6.20 m3 0.001 - 0.001 6.20 m3 0.001 - 0.00144 6.20 m3 0.00144 -
m3 0.00710 0.00323 0.00323 0.007 64.35 m3 0.007 - 0.007 64.35 m3 0.007 - 0.00750 64.35 m3 0.00750 -
m2 0.11999 0.03484 0.01742 0.01742 0.120 237.96 m2 0.120 - 0.127 237.96 m2 0.127 - 0.12668 237.96 m2 0.12668 -

m3 0.14114 0.02705 0.02705 0.141 2,413.94 m3 0.141 - 0.149 2,413.94 m3 0.149 - 0.14901 2,413.94 m3 0.14901 -

m3 0.05148 0.01010 0.01010 0.051 138.68 m3 0.051 - 0.054 138.68 m3 0.054 - 0.05436 138.68 m3 0.05436 -
m3 0.07868 0.01543 0.01543 0.079 69.34 m3 0.079 - 0.083 69.34 m3 0.083 - 0.08307 69.34 m3 0.08307 -
m3 1.17868 0.23294 0.11647 0.11647 1.179 856.70 m3 1.179 - 1.244 856.70 m3 1.244 - 1.24447 856.70 m3 1.24447 -
kg 2.12908 0.41456 0.20728 0.20728 2.129 119,199.98 kg 2.129 - 2.248 119,199.98 kg 2.248 - 2.24793 119,199.98 kg 2.24793 -
m3 0.01521 0.00298 0.00298 0.015 69.34 m3 0.015 - 0.016 69.34 m3 0.016 - 0.01606 69.34 m3 0.01606 -
m3 0.11615 0.02222 0.02222 0.116 1,052.25 m3 0.116 - 0.123 1,052.25 m3 0.123 - 0.12263 1,052.25 m3 0.12263 -
m2 1.73058 0.34512 0.17256 0.17256 1.731 3,432.11 m2 1.731 - 1.827 3,432.11 m2 1.827 - 1.82718 3,432.11 m2 1.82718 -

m3 0.00924 - 0.009 158.08 m3 0.009 - 0.010 158.08 m3 0.010 - 0.00976 158.08 m3 0.00976 -

m3 0.00473 - 0.005 12.74 m3 0.005 - 0.005 12.74 m3 0.005 - 0.00499 12.74 m3 0.00499 -
m3 0.00723 - 0.007 6.37 m3 0.007 - 0.008 6.37 m3 0.008 - 0.00763 6.37 m3 0.00763 -
m3 0.17471 - 0.175 126.99 m3 0.175 - 0.184 126.99 m3 0.184 - 0.18447 126.99 m3 0.18447 -
kg 0.32292 - 0.323 18,079.49 kg 0.323 - 0.341 18,079.49 kg 0.341 - 0.34095 18,079.49 kg 0.34095 -
m3 0.00140 - 0.001 6.37 m3 0.001 - 0.001 6.37 m3 0.001 - 0.00148 6.37 m3 0.00148 -
m3 0.02217 - - 0.022 200.85 m3 0.022 - 0.023 200.85 m3 0.023 - 0.02341 200.85 m3 0.02341 -
m2 0.19567 - 0.196 388.05 m2 0.196 - 0.207 388.05 m2 0.207 - 0.20659 388.05 m2 0.20659 -

m3 0.02461 0.02461 0.02461 - 420.86 m3 0.025 0.025 0.025 0.026 420.86 m3 0.026 - 0.02598 420.86 m3 0.02598 -

m3 0.01503 0.01503 0.01503 - 40.48 m3 0.015 0.015 0.015 0.016 40.48 m3 0.016 - 0.01587 40.48 m3 0.01587 -
m3 0.02297 0.02297 0.02297 - 20.24 m3 0.023 0.023 0.023 0.024 20.24 m3 0.024 - 0.02425 20.24 m3 0.02425 -
m3 0.44476 0.44476 0.22238 0.22238 - 323.26 m3 0.445 0.445 0.111 0.111 0.111 0.111 0.470 323.26 m3 0.470 - 0.46958 323.26 m3 0.46958 -
kg 0.67532 0.67532 0.49283 0.18249 - 37,808.67 kg 0.675 0.675 0.169 0.169 0.169 0.169 0.713 37,808.67 kg 0.713 - 0.71301 37,808.67 kg 0.71301 -
m3 0.00444 0.00444 0.00444 - 20.24 m3 0.004 0.004 0.004 0.005 20.24 m3 0.005 - 0.00469 20.24 m3 0.00469 -
m3 0.03752 0.03752 0.03752 - 339.90 m3 0.038 0.038 0.038 0.040 339.90 m3 0.040 - 0.03961 339.90 m3 0.03961 -
m2 0.40975 0.40975 0.20487 0.20487 - 812.61 m2 0.410 0.410 0.137 0.137 0.137 0.433 812.61 m2 0.433 - 0.43262 812.61 m2 0.43262 -

m3 0.02146 0.02146 0.02146 0.021 367.08 m3 0.021 - 0.023 367.08 m3 0.023 - 0.02266 367.08 m3 0.02266 -

m3 0.00738 0.00738 0.00738 0.007 19.88 m3 0.007 - 0.008 19.88 m3 0.008 - 0.00779 19.88 m3 0.00779 -
m3 0.01128 0.01128 0.01128 0.011 9.94 m3 0.011 - 0.012 9.94 m3 0.012 - 0.01191 9.94 m3 0.01191 -
m3 0.28219 0.28219 0.09406 0.09406 0.09406 0.282 205.10 m3 0.282 - 0.298 205.10 m3 0.298 - 0.29794 205.10 m3 0.29794 -
kg 0.46552 0.46552 0.15517 0.23611 0.07423 0.466 26,062.73 kg 0.466 - 0.492 26,062.73 kg 0.492 - 0.49150 26,062.73 kg 0.49150 -
m3 0.00218 0.00218 0.00218 0.002 9.94 m3 0.002 - 0.002 9.94 m3 0.002 - 0.00230 9.94 m3 0.00230 -
m3 0.01194 0.01194 0.01194 0.012 108.15 m3 0.012 - 0.013 108.15 m3 0.013 - 0.01260 108.15 m3 0.01260 -
m2 0.32194 0.32194 0.16097 0.16097 0.322 638.47 m2 0.322 - 0.340 638.47 m2 0.340 - 0.33991 638.47 m2 0.33991 -

m3 0.03279 0.03279 0.03279 - 54.00 m3 0.033 0.033 0.016 0.016 0.035 54.00 m3 0.035 - 0.03462 54.00 m3 0.03462 -

100.00000 24.97181 0.74118 0.74118 0.99581 0.99581 0.99581 1.59809 1.59000 0.00415 0.00415 1.37870 1.38336 2.77279 1.89635 2.17409 2.18006 BOBOT S/D MGG 100.000 14.909 0.216 0.216 0.211 0.211 0.211 0.211 0.228 0.494 0.545 0.895 0.886 0.886 0.933 0.616 BOBOT S/D MGG 100.000 3.57014 0.53125 0.53125 0.68090 0.34754 0.18406 BOBOT S/D 100.000 1.69779
99 KONTRAK ADD 85.09150 113 KONTRAK 91.23928 MGG 118 98.20211
75.02819 75.76937 76.51055 77.50636 78.50218 79.49799 81.09608 82.68608 82.69022 82.69437 84.07307 85.45643 88.22921 90.12556 92.29965 94.47971 3 85.091 85.30783 85.524 85.735 85.947 86.158 86.369 86.597 87.091 87.636 88.531 89.417 90.303 91.236 91.852 ADD 5 96.42986 96.96112 97.49237 98.17327 98.52081 98.70487 KONTRAK 98.30221
ADD 5
0.41207 0.00400 0.00400 0.00398 0.00398 0.09723 0.00397 0.00397 0.00398 0.00398 0.14161 0.59304 0.60112 2.99945 5.1870 BOBOT S/D MGG 0.07994 0.02935 0.34105 0.10545 0.47819 1.38760 0.329049996 1.19140 0.74016 1.29369 0.05269 0.03752 0.07449 0.00720 BOBOT S/D MGG 0.40787 0.47513 0.53053 0.36233 0.09648 BOBOT S/D
99 ADEDNDUM 3 85.09150 113 ADEDNDUM 6 96.42986 MGG 118 98.30221
75.0282 75.44026 75.44426 75.44825 75.45224 75.45621 75.55343 75.55740 75.56136 75.56534 75.56932 75.71093 76.30397 76.90509 79.90454 85.09150 85.091 85.17144 85.20079 85.54184 85.64729 86.12548 87.51309 87.84214 89.03354 89.77369 91.06739 91.12007 91.15759 91.23208 91.23928 96.430 96.73764 97.21277 97.74330 98.10563 98.20211 ADEDNDUM 7 98.30221

(0.32911) (1.06629) (2.05811) (3.04994) (4.04179) (5.54265) (7.12868) (7.12887) (7.12903) (8.50375) (9.74550) (11.92524) (13.22048) (12.39511) (9.38821) DEVIASI - -0.13639 -0.32338 -0.19353 -0.29928 -0.03229 1.14412 1.24557 1.94253 2.13760 2.53665 1.70330 0.85478 -0.00410 -0.61274 DEVIASI (5.19059) -0.15675 -0.24623 -0.42997 -0.41518 -0.50276 DEVIASI (0.10010)
MINGGU 119 MINGGU 120 MINGGU 121 MINGGU 122 MINGGU 123 MINGGU 124 MINGGU 125 MINGGU 126 MINGGU 127 MINGGU 128 MINGGU 129 MINGGU 130 MINGGU 131 MINGGU 132 MINGGU 133 MINGGU 134 MINGGU 135 MINGGU 136 ADD KONTRAK BOBOT MINGGU 137 MINGGU 138 MINGGU 139 MINGGU 140 MINGGU 141 MINGGU 142 MINGGU 143 MINGGU 144 MINGGU 145 MINGGU 146 MINGGU 147 MINGGU 148 MINGGU 149 MINGGU 150 ADD KONTRAK BOBOT MINGGU 151 MINGGU 152 MINGGU 153 MINGGU 154 MINGGU 155 MINGGU 156 MINGGU 157 MINGGU 158 MINGGU 159 MINGGU 160 MINGGU 161
REALISASI REALISASI
09/12/2019 16/12/2019 23/12/2019 30/12/2019 06/01/2020 13/01/2020 20/01/2020 27/01/2020 03/02/2020 10/02/2020 17/02/2020 24/02/2020 02/03/2020 09/03/2020 16/03/2020 23/03/2020 30/03/2020 06/04/2020 S.D MINGGU VOLUME ACTUAL 13/04/2020 20/04/2020 27/04/2020 04/05/2020 11/05/2020 18/05/2020 25/05/2020 01/06/2020 08/06/2020 15/06/2020 22/06/2020 29/06/2020 06/07/2020 13/07/2020 S.D MINGGU VOLUME ACTUAL 20/07/2020 27/07/2020 03/08/2020 10/08/2020 17/08/2020 24/08/2020 31/08/2020 07/09/2020 14/09/2020 21/09/2020 28/09/2020
SISA SISA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d 136 VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d 150 VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
15/12/2019 22/12/2019 29/12/2019 05/01/2020 12/01/2020 19/01/2020 26/01/2020 02/02/2020 09/02/2020 16/02/2020 23/02/2020 01/03/2020 08/03/2020 15/03/2020 22/03/2020 29/03/2020 05/04/2020 12/04/2020 19/04/2020 26/04/2020 03/05/2020 10/05/2020 17/05/2020 24/05/2020 31/05/2020 07/06/2020 14/06/2020 21/06/2020 28/06/2020 05/07/2020 12/07/2020 19/07/2020 26/07/2020 02/08/2020 09/08/2020 16/08/2020 23/08/2020 30/08/2020 06/09/2020 13/09/2020 20/09/2020 27/09/2020 04/10/2020

0.26863 90,000.00 m2 0.26863 - 0.26863 90,000.00 m2 0.26863 -


0.03392 2.00 set 0.06784 0.03392 0.008 0.008 0.03392 2.00 set 0.06784 0.03392
-
0.00407 30.00 ttk 0.00407 - 0.00407 30.00 ttk 0.00407 -
0.09056 445.00 ttk 0.09056 - 0.09056 445.00 ttk 0.09056 -

0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.00055 0.01791 58.00 ttk 0.02164 0.00373 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.01791 58.00 ttk 0.02164 0.00373 0.00062 0.00062 0.00062
0.01085 4.00 ttk 0.01085 - 0.01085 4.00 ttk 0.01085 -
0.02544 10.00 ttk 0.02544 - 0.02544 10.00 ttk 0.02544 -
-
-
0.04884 24.00 bln 0.04884 - 0.04884 24.00 bln 0.04884 -
0.38683 720.00 oh 0.38683 - 0.38683 720.00 oh 0.38683 -
-
0.05768 108.00 m2 0.06922 0.01154 0.05768 108.00 m2 0.06922 0.01154
0.00391 4.00 m2 0.00391 - 0.00391 4.00 m2 0.00391 -
0.03392 1.00 set 0.03392 - 0.03392 1.00 set 0.03392 -
-
-
-
0.06784 1.00 pkt 0.13567 0.06784 0.06784 1.00 pkt 0.13567 0.06784
0.80467 3,920.00 m2 0.80467 - 0.80467 3,920.00 m2 0.80467 -
0.20200 14.00 ttk 0.20200 - 0.20200 14.00 ttk 0.20200 -
-
-
-
0.27989 71,138.20 m2 0.27989 - 0.27989 71,138.20 m2 0.27989 -
0.69577 1,920.00 m2 0.69577 - 0.69577 1,920.00 m2 0.69577 -
-
4.04643 12,500.00 m2 4.04643 - 4.04643 12,500.00 m2 4.04643 -
-
-
0.67348 34,000.00 m2 0.67348 - 0.67348 34,000.00 m2 0.67348 -
0.02410 3,946.70 m2 0.02410 - 0.02410 3,946.70 m2 0.02410 -
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 22.09518 158,452.59 m3 22.65852 0.56334 0.141 0.141 0.141 0.141 22.09518 158,452.59 m3 22.65852 0.56334 0.094 0.094 0.094 0.094 0.094 0.094
0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 1.29194 8,207.00 m3 1.54437 0.25243 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 1.29194 8,207.00 m3 1.54437 0.25243 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028
1.96005 31,751.49 m3 1.96005 - 1.96005 31,751.49 m3 1.96005 -
0.74956 31,751.49 m3 0.74956 - 0.74956 31,751.49 m3 0.74956 -
-
-
0.046 0.046 0.046 0.046 0.046 4.64162 2,000.00 m' 4.64162 - 4.64162 2,000.00 m' 4.64162 -
2.69053 1,362.40 m' 2.69053 - 2.69053 1,362.40 m' 2.69053 -
-
-
0.35187 5,700.00 m3 0.35187 - 0.35187 5,700.00 m3 0.35187 -
0.46305 9,587.04 m3 0.46305 - 0.46305 9,587.04 m3 0.46305 -
0.58344 1,488.54 m3 0.58344 - 0.58344 1,488.54 m3 0.58344 -
0.89163 744.27 m2 0.89163 - 0.89163 744.27 m2 0.89163 -
12.84648 9,930.52 m3 12.84648 - 12.84648 9,930.52 m3 12.84648 -
15.65555 830,160.18 kg 15.65555 - 15.65555 830,160.18 kg 15.65555 -
0.17237 744.27 m3 0.17237 - 0.17237 744.27 m3 0.17237 -
11.53941 21,675.20 m2 11.53941 - 11.53941 21,675.20 m2 11.53941 -
-
-
-
-
- 324.00 ton 0.39439 0.39439 0.131 0.131 0.131 - 324.00 ton 0.39439 0.39439 0.131 0.131 0.131
ttk - - - ttk 0.00000 -
btg - - - btg 0.00000 -
0.39154 4,834.00 btg 0.39154 - 0.39154 4,834.00 btg 0.39154 -
-
-
m3 - - - m3 0.00000 -
m'sp - - - m'sp 0.00000 -
msp - - - msp 0.00000 -
msp - - - msp 0.00000 -
titik - - - titik 0.00000 -
-
-
-
- 30.00 buah 0.03449 0.03449 0.034 - 30.00 buah 0.03449 0.03449
- 1.00 set 0.00184 0.00184 0.002 - 1.00 set 0.00184 0.00184
4.76292 3,000.00 m' 4.76292 - 4.76292 3,000.00 m' 4.76292 -
-
-
-
-
-
-
-
-
-
-
-
-
-
- - m3 0.00000 - - - m3 0.00000 -
0.00408 84.49 m3 0.00408 - 0.00408 84.49 m3 0.00408 -
0.00411 10.49 m3 0.00411 - 0.00411 10.49 m3 0.00411 -
0.00743 6.20 m3 0.00743 - 0.00743 6.20 m3 0.00743 -
0.06632 45.66 m3 0.06632 - 0.06632 45.66 m3 0.06632 -
0.10274 5,447.89 kg 0.10274 - 0.10274 5,447.89 kg 0.10274 -
0.00144 6.20 m3 0.00144 - 0.00144 6.20 m3 0.00144 -
0.00750 64.35 m3 0.00750 - 0.00750 64.35 m3 0.00750 -
0.12668 237.96 m2 0.12668 - 0.12668 237.96 m2 0.12668 -
-
-
0.12225 1,980.43 m3 0.12225 - 0.12225 1,980.43 m3 0.12225 -
0.02094 433.51 m3 0.02094 - 0.02094 433.51 m3 0.02094 -
0.05436 138.68 m3 0.05436 - 0.05436 138.68 m3 0.05436 -
0.08307 69.34 m3 0.08307 - 0.08307 69.34 m3 0.08307 -
1.24447 856.70 m3 1.24447 - 1.24447 856.70 m3 1.24447 -
2.24793 119,199.98 kg 2.24793 - 2.24793 119,199.98 kg 2.24793 -
0.01606 69.34 m3 0.01606 - 0.01606 69.34 m3 0.01606 -
0.12263 1,052.25 m3 0.12263 - 0.12263 1,052.25 m3 0.12263 -
1.82718 3,432.11 m2 1.82718 - 1.82718 3,432.11 m2 1.82718 -
-
-
- - m3 0.00000 - - - m3 0.00000 -
0.00764 158.08 m3 0.00764 - 0.00764 158.08 m3 0.00764 -
0.00499 12.74 m3 0.00499 - 0.00499 12.74 m3 0.00499 -
0.00763 6.37 m3 0.00763 - 0.00763 6.37 m3 0.00763 -
0.18447 126.99 m3 0.18447 - 0.18447 126.99 m3 0.18447 -
0.34095 18,079.49 kg 0.34095 - 0.34095 18,079.49 kg 0.34095 -
0.00148 6.37 m3 0.00148 - 0.00148 6.37 m3 0.00148 -
0.02341 200.85 m3 0.02341 - 0.02341 200.85 m3 0.02341 -
0.20659 388.05 m2 0.20659 - 0.20659 388.05 m2 0.20659 -
-
-
-
- - m3 0.00000 - - - m3 0.00000 -
0.02033 420.86 m3 0.02033 - 0.02033 420.86 m3 0.02033 -
0.01587 40.48 m3 0.01587 - 0.01587 40.48 m3 0.01587 -
0.02425 20.24 m3 0.02425 - 0.02425 20.24 m3 0.02425 -
0.46958 323.26 m3 0.46958 - 0.46958 323.26 m3 0.46958 -
0.71301 37,808.67 kg 0.71301 - 0.71301 37,808.67 kg 0.71301 -
0.00469 20.24 m3 0.00469 - 0.00469 20.24 m3 0.00469 -
0.03961 339.90 m3 0.03961 - 0.03961 339.90 m3 0.03961 -
0.43262 812.61 m2 0.43262 - 0.43262 812.61 m2 0.43262 -
-
-
- - m3 0.00000 - - - m3 0.00000 -
0.01773 367.08 m3 0.01773 - 0.01773 367.08 m3 0.01773 -
0.00779 19.88 m3 0.00779 - 0.00779 19.88 m3 0.00779 -
0.01191 9.94 m3 0.01191 - 0.01191 9.94 m3 0.01191 -
0.29794 205.10 m3 0.29794 - 0.29794 205.10 m3 0.29794 -
0.49150 26,062.73 kg 0.49150 - 0.49150 26,062.73 kg 0.49150 -
0.00230 9.94 m3 0.00230 - 0.00230 9.94 m3 0.00230 -
0.01260 108.15 m3 0.01260 - 0.01260 108.15 m3 0.01260 -
0.33991 638.47 m2 0.33991 - 0.33991 638.47 m2 0.33991 -
-
0.03462 54.00 m3 0.03462 - 0.03462 54.00 m3 0.03462 -
-
-
-
-

0.05137 0.05137 0.05137 0.05137 0.05137 0.00495 0.00495 0.00550 0.00550 0.00550 0.03355 0.03355 0.03355 0.03355 0.03355 0.03355 0.03355 0.03355 BOBOT S/D 100.000 1.36351 0.03155 0.03155 0.17239 0.17239 0.17286 0.17286 0.16348 0.16348 0.13193 0.00047 0.00047 0.00047 0.00848 0.04481 BOBOT S/D 100.000 1.36351 0.02805 0.12194 0.12194 0.12194 0.12194 0.12194 0.12194 0.15951 0.16013 0.13209 0.00062
MGG 136 99.31034 MGG 150 99.11704
98.35358 98.40495 98.45632 98.50769 98.55905 98.56401 98.56896 98.57446 98.57997 98.58547 98.61902 98.65256 98.68611 98.71966 98.75320 98.78675 98.82030 98.85384 ADEDNDUM 7 98.63649 98.66804 98.69959 98.87198 99.04437 99.21723 99.39008 99.55357 99.71705 99.84898 99.84945 99.84991 99.85038 99.85886 99.90367 ADEDNDUM 8 98.63649 98.66453 98.78647 98.90841 99.03035 99.15229 99.27422 99.39616 99.55567 99.71581 99.84789 99.84851

0.22048 0.15976 0.17116 0.05062 0.12554 0.06852 0.06035 0.06520 0.0000 0.00485 0.08164 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 BOBOT S/D 0.00000 0.00000 0.00000 0.00000 0.0000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 BOBOT S/D 0.00000
MGG 136 98.63649 MGG 150 98.63649
98.52269 98.68245 98.85361 98.90423 99.02978 99.09830 99.15865 99.22385 99.22385 99.22870 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 99.31034 ADEDNDUM 8 98.63649 99.11704 99.11704 99.11704 99.11704 99.11704 99.11704 99.11704 99.11704 99.11704 99.11704 99.11704 99.11704 99.11704 99.11704 ADEDNDUM 9 100.00000 99.11704

0.16911 0.27750 0.39729 0.39655 0.47072 0.53429 0.58968 0.64938 0.64388 0.64323 0.69133 0.65778 0.62423 0.59069 0.55714 0.52359 0.49005 0.45650 DEVIASI 0.67386 -0.02332 -0.04664 -0.10712 -0.16761 -0.22856 -0.28950 -0.44475 -0.60001 -0.73194 -0.73240 -0.73287 -0.73333 -0.74181 -0.78662 DEVIASI 0.48056 0.45251

Aceh Tamiang, 09 Agustus 2020


Dibuat dan Dihitung Oleh
KONTRAKTOR PELAKSANA
PT. DWIFARITA FAJARKHARISMA

Basuki Setyawan, ST
Site Manager
KET
MINGGU 162 MINGGU 163 MINGGU 164 MINGGU 165 MINGGU 166 MINGGU 167 MINGGU 168 MINGGU 169 MINGGU 170 MINGGU 171 MINGGU 172 MINGGU 173 MINGGU 174
05/10/2020 12/10/2020 19/10/2020 26/10/2020 02/11/2020 09/11/2020 16/11/2020 23/11/2020 30/11/2020 07/12/2020 14/12/2020 21/12/2020 28/12/2020
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
11/10/2020 18/10/2020 25/10/2020 01/11/2020 08/11/2020 15/11/2020 22/11/2020 29/11/2020 06/12/2020 13/12/2020 20/12/2020 27/12/2020 31/12/2020

0.011 0.011 0.011

0.00062 0.00062 0.00062

0.006 0.006

0.034 0.034

0.011 0.011 0.011


0.001 0.001 0.001

0.00062 0.01273 0.01273 0.01211 0.00000 0.00000 0.00000 0.00000 0.00000 0.01131 0.01131 0.05099 0.03969

99.84913 99.86187 99.87460 99.88671 99.88671 99.88671 99.88671 99.88671 99.88671 99.89802 99.90932 99.96031 100.00000
BALAI TEKNIK PERKERETAAPIAN WILAYAH SUMATERA BAGIAN UTARA
REKAPITULASI HARIAN
LAPORAN FISIK PELAKSANAAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG
KM.441 + 000 s.d KM. 444 + 000 MINGGU KE :
PAKET : BSL - 10 153 ( SERATUS LIMA PULUH TIGA )
KEMENTERIAN / : KEMENTERIAN PERHUBUNGAN
INSTANSI DIREKTORAT JENDERAL PERKERETAAPIAN TANGGAL :
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA 03 Agustus 2020
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA S.D
NOMER KONTRAK : 10/SP/ SP- BSL/BTP-SBU/IX/2017 09 Agustus 2020
TANGGAL 04 September 2017
NOMER KONTRAK ADD1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD 2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD 3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD 4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD 5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD 6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD 7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMER KONTRAK ADD 8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMER KONTRAK ADD 9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JANGKA WAKTU 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN : PT. HARAWANA CONSULTANT

HARI SENIN SELASA RABU KAMIS JUMAT SABTU MINGGU


JUMLAH BAHAN
TANGGAL 03/08/2020 04/08/2020 05/08/2020 06/08/2020 07/08/2020 08/08/2020 09/08/2020
JAM KERJA EFEKTIP 9 9 9 9 9 9 9 JENIS BAHAN JUMLAH
JUMLAH JAM KERJA 63 YANG DIDATANGKAN YANG DITERIMA
NO TENAGA KERJA JUMLAH TENAGA
1 Site Manager 1 org 1 org 1 org 1 org 1 org 1 org 1 org
2 Pelaksana 1 org 1 org 1 org 1 org 1 org 1 org 1 org
3 Administrasi 1 org 1 org 1 org 1 org 1 org 1 org 1 org
4 Logistik 1 org 1 org 1 org 1 org 1 org 1 org 1 org
5 Mandor 2 org 2 org 2 org 2 org 2 org 2 org 2 org
6 Kepala Tukang Besi 1 org 1 org 0 org 1 org 1 org 0 org 0 org
7 Kepala Tukang Batu 1 org 1 org 0 org 1 org 1 org 0 org 0 org
8 Kepala Tukang Kayu 1 org 1 org 0 org 1 org 1 org 0 org 0 org
9 Kepala Tukang Las 0 org 0 org 0 org 0 org 0 org 0 org 0 org
10 Tukang Cat 0 org 0 org 0 org 0 org 0 org 0 org 0 org
11 Tukang Besi 2 org 2 org 0 org 2 org 2 org 0 org 0 org
12 Tukang Batu 2 org 2 org 0 org 2 org 2 org 0 org 0 org
13 Tukang Kayu 2 org 2 org 0 org 2 org 2 org 0 org 0 org
14 Tukang Las 0 org 0 org 0 org 0 org 0 org 0 org 0 org
15 Tukang Cat 0 org 0 org 0 org 0 org 0 org 0 org 0 org
16 Operator Exavator 1 org 1 org 1 org 1 org 1 org 1 org 1 org
17 Operator Vibrator Roller 0 org 0 org 0 org 0 org 0 org 0 org 0 org
18 Operator Buldozer 0 org 0 org 0 org 0 org 0 org 0 org 0 org
19 Juru Ukur 1 org 1 org 1 org 1 org 1 org 1 org 1 org
20 Pembantu Juru Ukur 4 org 4 org 4 org 4 org 4 org 4 org 4 org
21 Pekerja 25 org 25 org 12 org 25 org 25 org 15 org 15 org
22 Sopir 6 org 6 org 4 org 6 org 6 org 3 org 3 org
23 Keamanan 6 org 6 org 6 org 6 org 6 org 6 org 6 org
58 org 58 org 34 org 58 org 58 org 36 org 36 org
PEKERJAAN YANG DILAKSANAKAN
NO URAIAN PEEKERJAAN VOLUME

Aceh Tamiang, 09 Agustus 2020


: MENGETAHUI : DIBUAT OLEH
BALAI PERKERETAAPIAN KONTRAKTOR PELAKSANA
KELAS II WILAYAH SUMATERA BAGIAN UTARA
PEJABAT PEMBUAT KOMITMEN ACEH WILAYAH II PT. DWIFARITA FAJARKHARISMA

Muhammad Ridwan
Pelaksana
Indra Gunawan Muhammad Ridwan
Pengawas Jalan KA Pelaksana
BALAI TEKNIK PERKERETAAPIAN WILAYAH SUMATERA BAGIAN UTARA
LAPORAN HARIAN
LAPORAN FISIK PELAKSANAAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG
HARI KE : 1065
KM.441 + 000 s.d KM. 444 + 000
KEMENTERIAN / : KEMENTERIAN PERHUBUNGAN
INSTANSI DIREKTORAT JENDERAL PERKERETAAPIAN SENIN
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA
03 Agustus 2020
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA
NOMER KONTRAK : 10/SP/ SP- BSL/BTP-SBU/IX/2017
TANGGAL : 04 September 2017
NOMER KONTRAK ADD1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD 2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD 3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD 4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD 5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD 6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD 7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMER KONTRAK ADD 8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMER KONTRAK ADD 9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JANGKA WAKTU : 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN : PT. HARAWANA CONSULTANT
TENAGA KERJA BAHAN / MATERIAL PERALATAN
NO.
KEAHLIAN JUMLAH JENIS BAHAN DIDATANGKAN DATANG DITERIMA JENIS PERALATAN JUMLAH
1 Site Manager 1 Mobil 4 unit
2 Pelaksana 1 Camera Digital 2 unit
3 Administrasi 1 Excavator 1 unit
4 Logistik 1 Meteran 4 bh
5 Mandor 2 Theodholit 1 unit
6 Kepala Tukang Besi 1 Water pass 1 unit
7 Kepala Tukang Batu 1 Buldozer - unit
8 Kepala Tukang Kayu 1 Vibrator Roller - unit
9 Kepala Tukang Las 0 Golok 6 bh
10 Tukang Cat 0 Senter 4 unit
11 Tukang Besi 2 Peralatan Pembesian - set
12 Tukang Batu 2 Peralatan Tk.Kayu - set
13 Tukang Kayu 2 Peralatan Tk.Batu - set
14 Tukang Las 0 Vibrator 3 unit
15 Tukang Cat 0
16 Operator Exavator 1
17 Operator Vibrator Roller 0
18 Operator Buldozer 0
19 Juru Ukur 1
20 Pembantu Juru Ukur 4
21 Pekerja 25
22 Sopir 6
23 Keamanan 6
Jumlah 58
PEKERJAAN YANG DILAKSANAKAN
NO
URAIAN PEKERJAAN VOLUME

PEKERJAAN
Mulai Jam : 07.00 Selesai Jam : 17.00

HARI DAPAT / TIDAK DAPAT SELURUHNYA DIGUNAKAN UNTUK PEKERJAAN OLEH KARENA CUACA
CERAH / GERIMIS / HUJAN
Hujan Mulai Jam :
Gerimis Mulai Jam :
Waktu Efektip : 9 Jam
Aceh Tamiang, 03 Agustus 2020
MENGETAHUI : : DIBUAT OLEH
BALAI PERKERETAAPIAN KELAS II WILAYAH KONTRAKTOR PELAKSANA
SUMATERA BAGIAN UTARA PEJABAT PEMBUAT
KOMITMEN ACEH WILAYAH II PT. DWIFARITA FAJARKHARISMA

Kadiv Teknis Jalan KA


Satker PPJB
Kadiv Teknis Jalan KA
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana

ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
BALAI TEKNIK PERKERETAAPIAN WILAYAH SUMATERA BAGIAN UTARA
LAPORAN HARIAN
LAPORAN FISIK PELAKSANAAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG
HARI KE : 1066
KM.441 + 000 s.d KM. 444 + 000
KEMENTERIAN / : KEMENTERIAN PERHUBUNGAN
INSTANSI DIREKTORAT JENDERAL PERKERETAAPIAN SELASA
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA
04 Agustus 2020
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA
NOMER KONTRAK : 10/SP/ SP- BSL/BTP-SBU/IX/2017
TANGGAL : 04 September 2017
NOMER KONTRAK ADD1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD 2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD 3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD 4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD 5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD 6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD 7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMER KONTRAK ADD 8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMER KONTRAK ADD 9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JANGKA WAKTU : 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN : PT. HARAWANA CONSULTANT
TENAGA KERJA BAHAN / MATERIAL PERALATAN
NO.
KEAHLIAN JUMLAH JENIS BAHAN DIDATANGKAN DATANG DITERIMA JENIS PERALATAN JUMLAH
1 Site Manager 1 Mobil 4 unit
2 Pelaksana 1 Camera Digital 2 unit
3 Administrasi 1 Excavator 1 unit
4 Logistik 1 Meteran 4 bh
5 Mandor 2 Theodholit 1 unit
6 Kepala Tukang Besi 1 Water pass 1 unit
7 Kepala Tukang Batu 1 Buldozer - unit
8 Kepala Tukang Kayu 1 Vibrator Roller - unit
9 Kepala Tukang Las 0 Golok 6 bh
10 Tukang Cat 0 Senter 4 unit
11 Tukang Besi 2 Peralatan Pembesian - set
12 Tukang Batu 2 Peralatan Tk.Kayu - set
13 Tukang Kayu 2 Peralatan Tk.Batu - set
14 Tukang Las 0 Vibrator 3 unit
15 Tukang Cat 0
16 Operator Exavator 1
17 Operator Vibrator Roller 0
18 Operator Buldozer 0
19 Juru Ukur 1
20 Pembantu Juru Ukur 4
21 Pekerja 25
22 Sopir 6
23 Keamanan 6
Jumlah 58
PEKERJAAN YANG DILAKSANAKAN
NO
URAIAN PEKERJAAN VOLUME

PEKERJAAN
Mulai Jam : 07.00 Selesai Jam : 17.00

HARI DAPAT / TIDAK DAPAT SELURUHNYA DIGUNAKAN UNTUK PEKERJAAN OLEH KARENA CUACA
CERAH / GERIMIS / HUJAN
Hujan Mulai Jam :
Gerimis Mulai Jam :
Waktu Efektip : 9 Jam
Aceh Tamiang, 04 Agustus 2020
MENGETAHUI : : DIBUAT OLEH
BALAI PERKERETAAPIAN KELAS II WILAYAH KONTRAKTOR PELAKSANA
SUMATERA BAGIAN UTARA PEJABAT PEMBUAT
KOMITMEN ACEH WILAYAH II PT. DWIFARITA FAJARKHARISMA

Kadiv Teknis Jalan KA


Satker
Kadiv PPJB
Teknis Jalan KA
KadivSatker
TeknisPPJB
Jalan KA
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana

ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
BALAI TEKNIK PERKERETAAPIAN WILAYAH SUMATERA BAGIAN UTARA
LAPORAN HARIAN
LAPORAN FISIK PELAKSANAAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG
HARI KE : 1067
KM.441 + 000 s.d KM. 444 + 000
KEMENTERIAN / : KEMENTERIAN PERHUBUNGAN
INSTANSI DIREKTORAT JENDERAL PERKERETAAPIAN RABU
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA
05 Agustus 2020
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA
NOMER KONTRAK : 10/SP/ SP- BSL/BTP-SBU/IX/2017
TANGGAL : 04 September 2017
NOMER KONTRAK ADD1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD 2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD 3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD 4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD 5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD 6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD 7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMER KONTRAK ADD 8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMER KONTRAK ADD 9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JANGKA WAKTU : 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN : PT. HARAWANA CONSULTANT
TENAGA KERJA BAHAN / MATERIAL PERALATAN
NO.
KEAHLIAN JUMLAH JENIS BAHAN DIDATANGKAN DATANG DITERIMA JENIS PERALATAN JUMLAH
1 Site Manager 1 Mobil 4 unit
2 Pelaksana 1 Camera Digital 2 unit
3 Administrasi 1 Excavator 1 unit
4 Logistik 1 Meteran 4 bh
5 Mandor 2 Theodholit 1 unit
6 Kepala Tukang Besi 0 Water pass 1 unit
7 Kepala Tukang Batu 0 Buldozer - unit
8 Kepala Tukang Kayu 0 Vibrator Roller - unit
9 Kepala Tukang Las 0 Golok 6 bh
10 Tukang Cat 0 Senter 4 unit
11 Tukang Besi 0 Peralatan Pembesian - set
12 Tukang Batu 0 Peralatan Tk.Kayu - set
13 Tukang Kayu 0 Peralatan Tk.Batu - set
14 Tukang Las 0 Vibrator 3 unit
15 Tukang Cat 0
16 Operator Exavator 1
17 Operator Vibrator Roller 0
18 Operator Buldozer 0
19 Juru Ukur 1
20 Pembantu Juru Ukur 4
21 Pekerja 12
22 Sopir 4
23 Keamanan 6
Jumlah 34
PEKERJAAN YANG DILAKSANAKAN
NO
URAIAN PEKERJAAN VOLUME

PEKERJAAN
Mulai Jam : 07.00 Selesai Jam : 17.00

HARI DAPAT / TIDAK DAPAT SELURUHNYA DIGUNAKAN UNTUK PEKERJAAN OLEH KARENA CUACA
CERAH / GERIMIS / HUJAN
Hujan Mulai Jam :
Gerimis Mulai Jam :
Waktu Efektip : 9 Jam
Aceh Tamiang, 05 Agustus 2020
MENGETAHUI : : DIBUAT OLEH
BALAI PERKERETAAPIAN KELAS II WILAYAH KONTRAKTOR PELAKSANA
SUMATERA BAGIAN UTARA PEJABAT PEMBUAT
KOMITMEN ACEH WILAYAH II PT. DWIFARITA FAJARKHARISMA

Kadiv Teknis Jalan KA


Satker
Kadiv PPJB
Teknis Jalan KA
KadivSatker
TeknisPPJB
Jalan KA
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana

ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
BALAI TEKNIK PERKERETAAPIAN WILAYAH SUMATERA BAGIAN UTARA
LAPORAN HARIAN
LAPORAN FISIK PELAKSANAAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG
HARI KE : 1068
KM.441 + 000 s.d KM. 444 + 000
KEMENTERIAN / : KEMENTERIAN PERHUBUNGAN
INSTANSI DIREKTORAT JENDERAL PERKERETAAPIAN KAMIS
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA
06 Agustus 2020
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA
NOMER KONTRAK : 10/SP/ SP- BSL/BTP-SBU/IX/2017
TANGGAL : 04 September 2017
NOMER KONTRAK ADD1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD 2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD 3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD 4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD 5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD 6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD 7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMER KONTRAK ADD 8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMER KONTRAK ADD 9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JANGKA WAKTU : 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN : PT. HARAWANA CONSULTANT
TENAGA KERJA BAHAN / MATERIAL PERALATAN
NO.
KEAHLIAN JUMLAH JENIS BAHAN DIDATANGKAN DATANG DITERIMA JENIS PERALATAN JUMLAH
1 Site Manager 1 Mobil 4 unit
2 Pelaksana 1 Camera Digital 2 unit
3 Administrasi 1 Excavator 1 unit
4 Logistik 1 Meteran 4 bh
5 Mandor 2 Theodholit 1 unit
6 Kepala Tukang Besi 1 Water pass 1 unit
7 Kepala Tukang Batu 1 Buldozer - unit
8 Kepala Tukang Kayu 1 Vibrator Roller - unit
9 Kepala Tukang Las 0 Golok 6 bh
10 Tukang Cat 0 Senter 4 unit
11 Tukang Besi 2 Peralatan Pembesian - set
12 Tukang Batu 2 Peralatan Tk.Kayu - set
13 Tukang Kayu 2 Peralatan Tk.Batu - set
14 Tukang Las 0 Vibrator 3 unit
15 Tukang Cat 0
16 Operator Exavator 1
17 Operator Vibrator Roller 0
18 Operator Buldozer 0
19 Juru Ukur 1
20 Pembantu Juru Ukur 4
21 Pekerja 25
22 Sopir 6
23 Keamanan 6
Jumlah 58
PEKERJAAN YANG DILAKSANAKAN
NO
URAIAN PEKERJAAN VOLUME

PEKERJAAN
Mulai Jam : 07.00 Selesai Jam : 17.00

HARI DAPAT / TIDAK DAPAT SELURUHNYA DIGUNAKAN UNTUK PEKERJAAN OLEH KARENA CUACA
CERAH / GERIMIS / HUJAN
Hujan Mulai Jam :
Gerimis Mulai Jam :
Waktu Efektip : 9 Jam
Aceh Tamiang, 06 Agustus 2020
MENGETAHUI : : DIBUAT OLEH
BALAI PERKERETAAPIAN KELAS II WILAYAH KONTRAKTOR PELAKSANA
SUMATERA BAGIAN UTARA PEJABAT PEMBUAT
KOMITMEN ACEH WILAYAH II PT. DWIFARITA FAJARKHARISMA

Kadiv Teknis Jalan KA


Satker
Kadiv PPJB
Teknis Jalan KA
KadivSatker
TeknisPPJB
Jalan KA
Satker PPJB
Muhammad Ridwan
Indra Gunawan Pengawas
KadivSatker
TeknisPPJB
Jalan KA
Satker PPJB
Muhammad Ridwan
Indra Gunawan Pengawas
Pelaksana
Pekerjaan Tubuh Baan dan Bangunan

ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
BALAI TEKNIK PERKERETAAPIAN WILAYAH SUMATERA BAGIAN UTARA
LAPORAN HARIAN
LAPORAN FISIK PELAKSANAAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG
HARI KE : 1069
KM.441 + 000 s.d KM. 444 + 000
KEMENTERIAN / : KEMENTERIAN PERHUBUNGAN
INSTANSI DIREKTORAT JENDERAL PERKERETAAPIAN JUMAT
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA
: PT. DWIFARITA FAJARKHARISMA
07 Agustus 2020
KONTRAKTOR
NOMER KONTRAK : 10/SP/ SP- BSL/BTP-SBU/IX/2017
TANGGAL : 04 September 2017
NOMER KONTRAK ADD1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD 2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD 3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD 4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD 5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD 6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD 7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMER KONTRAK ADD 8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMER KONTRAK ADD 9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JANGKA WAKTU : 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN : PT. HARAWANA CONSULTANT
TENAGA KERJA BAHAN / MATERIAL PERALATAN
NO.
KEAHLIAN JUMLAH JENIS BAHAN DIDATANGKAN DATANG DITERIMA JENIS PERALATAN JUMLAH
1 Site Manager 1 Mobil 4 unit
2 Pelaksana 1 Camera Digital 2 unit
3 Administrasi 1 Excavator 1 unit
4 Logistik 1 Meteran 4 bh
5 Mandor 2 Theodholit 1 unit
6 Kepala Tukang Besi 1 Water pass 1 unit
7 Kepala Tukang Batu 1 Buldozer - unit
8 Kepala Tukang Kayu 1 Vibrator Roller - unit
9 Kepala Tukang Las 0 Golok 6 bh
10 Tukang Cat 0 Senter 4 unit
11 Tukang Besi 2 Peralatan Pembesian - set
12 Tukang Batu 2 Peralatan Tk.Kayu - set
13 Tukang Kayu 2 Peralatan Tk.Batu - set
14 Tukang Las 0 Vibrator 3 unit
15 Tukang Cat 0
16 Operator Exavator 1
17 Operator Vibrator Roller 0
18 Operator Buldozer 0
19 Juru Ukur 1
20 Pembantu Juru Ukur 4
21 Pekerja 25
22 Sopir 6
23 Keamanan 6
Jumlah 58
PEKERJAAN YANG DILAKSANAKAN
NO
URAIAN PEKERJAAN VOLUME

PEKERJAAN
Mulai Jam : 07.00 Selesai Jam : 17.00

HARI DAPAT / TIDAK DAPAT SELURUHNYA DIGUNAKAN UNTUK PEKERJAAN OLEH KARENA CUACA
CERAH / GERIMIS / HUJAN
Hujan Mulai Jam :
Gerimis Mulai Jam :
Waktu Efektip : 9 Jam
Aceh Tamiang, 07 Agustus 2020
MENGETAHUI : : DIBUAT OLEH
BALAI PERKERETAAPIAN KELAS II WILAYAH KONTRAKTOR PELAKSANA
SUMATERA BAGIAN UTARA PEJABAT PEMBUAT
KOMITMEN ACEH WILAYAH II PT. DWIFARITA FAJARKHARISMA

Kadiv Teknis Jalan KA


Satker
Kadiv PPJB
Teknis Jalan KA
KadivSatker
TeknisPPJB
Jalan KA
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana

ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
BALAI TEKNIK PERKERETAAPIAN WILAYAH SUMATERA BAGIAN UTARA
LAPORAN HARIAN
LAPORAN FISIK PELAKSANAAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG
HARI KE : 1070
KM.441 + 000 s.d KM. 444 + 000
KEMENTERIAN / : KEMENTERIAN PERHUBUNGAN
INSTANSI DIREKTORAT JENDERAL PERKERETAAPIAN SABTU
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA
08 Agustus 2020
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA
NOMER KONTRAK : 10/SP/ SP- BSL/BTP-SBU/IX/2017
TANGGAL : 04 September 2017
NOMER KONTRAK ADD1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD 2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD 3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD 4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD 5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD 6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD 7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMER KONTRAK ADD 8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMER KONTRAK ADD 9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JANGKA WAKTU : 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN : PT. HARAWANA CONSULTANT
TENAGA KERJA BAHAN / MATERIAL PERALATAN
NO.
KEAHLIAN JUMLAH JENIS BAHAN DIDATANGKAN DATANG DITERIMA JENIS PERALATAN JUMLAH
1 Site Manager 1 Mobil 4 unit
2 Pelaksana 1 Camera Digital 2 unit
3 Administrasi 1 Excavator 1 unit
4 Logistik 1 Meteran 4 bh
5 Mandor 2 Theodholit 1 unit
6 Kepala Tukang Besi 0 Water pass 1 unit
7 Kepala Tukang Batu 0 Buldozer - unit
8 Kepala Tukang Kayu 0 Vibrator Roller - unit
9 Kepala Tukang Las 0 Golok 6 bh
10 Tukang Cat 0 Senter 4 unit
11 Tukang Besi 0 Peralatan Pembesian - set
12 Tukang Batu 0 Peralatan Tk.Kayu - set
13 Tukang Kayu 0 Peralatan Tk.Batu - set
14 Tukang Las 0 Vibrator 3 unit
15 Tukang Cat 0
16 Operator Exavator 1
17 Operator Vibrator Roller 0
18 Operator Buldozer 0
19 Juru Ukur 1
20 Pembantu Juru Ukur 4
21 Pekerja 15
22 Sopir 3
23 Keamanan 6
Jumlah 36
PEKERJAAN YANG DILAKSANAKAN
NO
URAIAN PEKERJAAN VOLUME

PEKERJAAN
Mulai Jam : 07.00 Selesai Jam : 17.00

HARI DAPAT / TIDAK DAPAT SELURUHNYA DIGUNAKAN UNTUK PEKERJAAN OLEH KARENA CUACA
CERAH / GERIMIS / HUJAN
Hujan Mulai Jam :
Gerimis Mulai Jam :
Waktu Efektip : 9 Jam
Aceh Tamiang, 08 Agustus 2020
MENGETAHUI : : DIBUAT OLEH
BALAI PERKERETAAPIAN KELAS II WILAYAH KONTRAKTOR PELAKSANA
SUMATERA BAGIAN UTARA PEJABAT PEMBUAT
KOMITMEN ACEH WILAYAH II PT. DWIFARITA FAJARKHARISMA

Kadiv Teknis Jalan KA


Satker
Kadiv PPJB
Teknis Jalan KA
KadivSatker
TeknisPPJB
Jalan KA
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana

ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
BALAI TEKNIK PERKERETAAPIAN WILAYAH SUMATERA BAGIAN UTARA
LAPORAN HARIAN
LAPORAN FISIK PELAKSANAAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN JALAN KA ANTARA LANGSA - BESITANG
HARI KE : 1071
KM.441 + 000 s.d KM. 444 + 000
KEMENTERIAN / : KEMENTERIAN PERHUBUNGAN
INSTANSI DIREKTORAT JENDERAL PERKERETAAPIAN MINGGU
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA
09 Agustus 2020
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA
NOMER KONTRAK : 10/SP/ SP- BSL/BTP-SBU/IX/2017
TANGGAL : 04 September 2017
NOMER KONTRAK ADD1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD 2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD 3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD 4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD 5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD 6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD 7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMER KONTRAK ADD 8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMER KONTRAK ADD 9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JANGKA WAKTU : 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN : PT. HARAWANA CONSULTANT
TENAGA KERJA BAHAN / MATERIAL PERALATAN
NO.
KEAHLIAN JUMLAH JENIS BAHAN DIDATANGKAN DATANG DITERIMA JENIS PERALATAN JUMLAH
1 Site Manager 1 Mobil 4 unit
2 Pelaksana 1 Camera Digital 2 unit
3 Administrasi 1 Excavator 1 unit
4 Logistik 1 Meteran 4 bh
5 Mandor 2 Theodholit 1 unit
6 Kepala Tukang Besi 0 Water pass 1 unit
7 Kepala Tukang Batu 0 Buldozer - unit
8 Kepala Tukang Kayu 0 Vibrator Roller - unit
9 Kepala Tukang Las 0 Golok 6 bh
10 Tukang Cat 0 Senter 4 unit
11 Tukang Besi 0 Peralatan Pembesian - set
12 Tukang Batu 0 Peralatan Tk.Kayu - set
13 Tukang Kayu 0 Peralatan Tk.Batu - set
14 Tukang Las 0 Vibrator 3 unit
15 Tukang Cat 0
16 Operator Exavator 1
17 Operator Vibrator Roller 0
18 Operator Buldozer 0
19 Juru Ukur 1
20 Pembantu Juru Ukur 4
21 Pekerja 15
22 Sopir 3
23 Keamanan 6
Jumlah 36
PEKERJAAN YANG DILAKSANAKAN
NO
URAIAN PEKERJAAN VOLUME

PEKERJAAN
Mulai Jam : 07.00 Selesai Jam : 17.00

HARI DAPAT / TIDAK DAPAT SELURUHNYA DIGUNAKAN UNTUK PEKERJAAN OLEH KARENA CUACA
CERAH / GERIMIS / HUJAN
Hujan Mulai Jam :
Gerimis Mulai Jam :
Waktu Efektip : 9 Jam
Aceh Tamiang, 09 Agustus 2020
MENGETAHUI : : DIBUAT OLEH
BALAI PERKERETAAPIAN KELAS II WILAYAH KONTRAKTOR PELAKSANA
SUMATERA BAGIAN UTARA PEJABAT PEMBUAT
KOMITMEN ACEH WILAYAH II PT. DWIFARITA FAJARKHARISMA

Kadiv Teknis Jalan KA


Satker
Kadiv PPJB
Teknis Jalan KA
KadivSatker
TeknisPPJB
Jalan KA
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana
Satker PPJB

Indra Gunawan Pengawas Muhammad Ridwan


Pekerjaan Tubuh Baan dan Bangunan Pelaksana

ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
ENDANG SUGITO
Nipp. 19524
MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU
VOLUME MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 ADD KONTRAK BOBOT
Kode Uraian Sub Output / SATUAN BOBOT (%) SKALA 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Sub Output
Komponen Sub Komponen Detail 04/09/2017 11/09/2017 18/09/2017 25/09/2017 02/10/2017 09/10/2017 16/10/2017 23/10/2017 30/10/2017 06/11/2017 13/11/2017 REALISASI S.D MINGGU 11 VOLUME ACTUAL SISA 20/11/2017 27/11/2017 04/12/2017 11/12/2017 18/12/2017 25/12/2017 01/01/2018 08/01/2018 15/01/2018 22/01/2018 29/01/2018 05/02/2018
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
10/09/2017 17/09/2017 24/09/2017 01/10/2017 08/10/2017 15/10/2017 22/10/2017 29/10/2017 05/11/2017 12/11/2017 19/11/2017 26/11/2017 03/12/2017 10/12/2017 17/12/2017 24/12/2017 31/12/2017 07/01/2018 14/01/2018 21/01/2018 28/01/2018 04/02/2018 11/02/2018
A UMUM
1.1. DESAIN, SURVEI, DAN PERIJINAN
1.1.1. DESAIN, SURVEI, DAN PERIJINAN 100

KA11001 1 Pengukuran topography m2 90,000.00 0.2686 0.0688 0.0688 0.0688 0.0688 0.07464 90,000.00 m2 0.2686 0.1940 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211
KA11002 2 Pembuatan shop drawing dan asbuilt drawing set 2.00 0.0678 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.00869 2.00 set 0.0678 0.0591
KA11004 3 Penyelidikan tanah
a. DCP ttk 30.00 0.0041 0.00008 0.00008 0.00008 0.00320 30.00 ttk 0.0041 0.0009
b. Sand Cone ttk 445.00 0.0906 0.00164 0.00164 0.00164 - 445.00 ttk 0.0906 0.0906 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189
c. Plat Bearing ttk 58.00 0.0216 0.00045 0.00045 0.00045 - 58.00 ttk 0.0216 0.0216
d. Penyelidikan sampel quarry ttk 4.00 0.0109 0.0042 0.0042 0.0042 0.0042 0.00556 4.00 ttk 0.0109 0.0053 0.00088 0.00088 0.00088 0.00088 0.00088 0.00088

1.2. MANAJEMEN LAPANGAN


1.2.1. ADMINISTRASI LAPANGAN
KA12002 1 Dokumentasi bln 24.00 0.0488 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00491 24.00 bln 0.0488 0.0439 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048
2 Jaga malam,peralatan kerja dan mesin - mesin oh 720.00 0.3868 - 720.00 oh 0.3868 0.3868 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420
1.2.2. OPERASIONAL KANTOR LAPANGAN
KA12101 1 Membuat dan membongkar direksi keet, los kerja, dan guda m2 108.00 0.0692 0.0177 0.0177 0.05914 108.00 m2 0.0692 0.0101
KA12102 2 Papan nama pekerjaan m2 4.00 0.003910 0.0040 0.00401 4.00 m2 0.0039 - 0.00010 - 0.00010
KA12111 3 Operasional direksikeet set 1.00 0.0339 90
0.0348 0.02608 1.00 set 0.0339 0.0078

1.3. MOBILISASI DAN DEMOBILISASI


1.3.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
KA15001 1 Mobilisasi dan demobilisasi Peralatan Berat pkt 1.00 0.1357 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.06954 1.00 pkt 0.1357 0.0661
KA21207 2 Perbaikan jalan akses masyarakat m2 3,920.00 0.8047 - 3,920.00 m2 0.8047 0.8047
3. Relokasi tiang PLN ttk 14.00 0.2020 14.00 ttk 0.2020 0.2020 0.1010 0.1010
B JALUR DAN BANGUNAN
2.1. SIPIL
2.1.1 Pekerjaan Persiapan
KA121001 1 Pembersihan lapangan dan perataan m2 71,138.20 0.2799 0.0465 0.0465 0.0465 0.28694 71,138.20 m2 0.2799 - 0.0070 - 0.00088 - 0.00088 - 0.00088 - 0.00088 - 0.00088 - 0.00088 - 0.00088 - 0.00088
2 Pembongkaran bangunan m2 1,920.00 0.6958 1,920.00 m2 0.6958 0.6958 0.17394 0.17394 0.17394 0.17394
2.1.2. PERBAIKAN TANAH DASAR
KA21101 1 Perkuatan dengan geotekstile m2 12,500.00 4.0464 0.1106 0.1106 0.1106 - 12,500.00 m2 4.0464 4.0464 0.1619 0.1619 0.1619 0.1619 0.1619

2.1.2. KONSTRUKSI TUBUH BAAN


KA21201 1 Stripping / pengupasan lapisan tanah dasar mak 50cm m2 37,946.70 0.7517 80 0.0197 0.0197 0.0197 0.68029 37,946.70 m2 0.7517 0.0714 0.0714
KA21206 2 Timbunan dengan material tanah pilihan m3 154,783.87 22.1339 0.30599 0.30599 0.30599 0.51310 154,783.87 m3 22.1339 21.6208 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578
KA21207 3 Timbunan dengan sirtu (sub balas) m3 7,413.95 1.3951 - 7,413.95 m3 1.3951 1.3951 0.0297 0.0297
KA21212 4 Galian tanah dengan alat berat m3 31,751.49 1.9600 0.2325 0.2325 0.2325 0.23416 31,751.49 m3 1.9600 1.7259 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431
KA21209 5 Membuang Tanah sejauh 30 m m3 31,751.49 0.7496 0.0889 0.0889 0.0889 0.08955 31,751.49 m3 0.7496 0.6600 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161

2.1.2. DRAINASE
KA21403 1 Drainase beton pracetak 80x80 cm tebal 10 cm m' 3,362.40 7.8035 70
- 3,362.40 m' 7.8035 7.8035

2 Retaining wall
KA21212 Galian Tanah m3 15,287.04 0.9437 - 15,287.04 m3 0.9437 0.9437
KA22701 Pasangan batu kosong m3 1,488.54 0.5834 - 1,488.54 m3 0.5834 0.5834
KA22002 Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m2 744.27 0.8916 - 744.27 m2 0.8916 0.8916
KA22004 Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 m3 9,930.52 12.8465 - 9,930.52 m3 12.8465 12.8465
KA22302 Pembesian dengan besi ulir m3 830,160.18 15.6555 - 830,160.18 m3 15.6555 15.6555
KA21210 Urugan pasir m3 744.27 0.1724 - 744.27 m3 0.1724 0.1724
KA22405 Bekisting m2 21,675.20 11.5394 70 - 21,675.20 m2 11.5394 11.5394

2.2 JALAN REL


2.2.1. MATERIAL JALAN KA
KA23017 1 Angkutan rel ton 324.00 0.3944 - 324.00 ton 0.3944 0.3944
KA23018 2 Bantalan Kayu untuk MJ lengkap dengan aksesoris ttk 0.00 - - - ttk - -
KA23019 3 Ecer Bantalan Beton Beserta alat penambat btg 0.00 - - - btg - -

2.2.2. KONSTRUKSI JALAN KA


KA23101 1 Pengadaan dan pengeceran balas m3 0.00 - - - m3 - -
KA23110 2 Pemasangan track R.54 dengan pemecokan awal m'sp 0.00 - - - m'sp - -
KA23111 3 MTT msp 0.00 - - - msp - -
KA23112 4 PBR msp 0.00 - - - msp - -
KA23118 5 Pengelasan flash butt R.54 titik 0.00 - - - titik - -

2.3. PENDUKUNG JALUR DAN BANGUNAN 60

2.3.1. PAPAN INFORMASI KONSTRUKSI


KA25401 1 Patok KM-HM buah 30.00 0.0345 - 30.00 buah 0.0345 0.0345
KA25407 2 Tanda-tanda lintas set 1.00 0.0018 - 1.00 set 0.0018 0.0018
KA21504 3 Pemasangan pagar sterilisasi panel beton t=120 cm m' 3,000.00 4.7629 - 3,000.00 m' 4.7629 4.7629

2.7. JEMBATAN

1 Underpass akses masyarakat uk. 6x5,5 (2 unit)


KA21212 Galian Tanah m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22701 Pasangan batu kosong m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22002 Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?
KA22004 Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 #NAME? #NAME? 50 - #NAME? m3 #NAME? #NAME?
KA22302 Pembesian dengan besi ulir kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA21210 Urugan pasir m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22405 Structural Backfill m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
50
KA22405 Bekisting m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?
2 Box Culvert uk. 4x4 (1 unit)
KA21212 Galian Tanah m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22701 Pasangan batu kosong m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22002 Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?
KA22004 Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22302 Pembesian dengan besi ulir kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA21210 Urugan pasir m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22405 Structural Backfill m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22405 Bekisting m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?

3 Jembatan Perlintasan Jalan Nasional


1. 'PEKERJAAN PONDASI
Loading Test
1 Axial Loading Test (Static Load Test) ttk #NAME? #NAME? - #NAME? ttk #NAME? #NAME?
2 Lateral Loading Test ttk #NAME? #NAME? - #NAME? ttk #NAME? #NAME?
40

Pondasi Abutmen A1
KA22509 1 Bore pile dia 800mm m' #NAME? #NAME? - #NAME? m' #NAME? #NAME?
KA22008 2 Beton Mutu tinggi f'c 30 pada borepile m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22302 3 Pembesian baja ulir BJTD-40 kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?

Pondasi Abutmen A2
KA22509 1 Bore pile dia 800mm m' #NAME? #NAME? - #NAME? m' #NAME? #NAME?
KA22303 2 Beton Mutu tinggi f'c 30 pada borepile m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22302 3 Pembesian baja ulir BJTD-40 kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?

2. PEKERJAAN ABUTMEN
Pekerjaan Abutmen A1
KA22701 1 Pasangan Batu Kosong m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22002 2 Beton Mutu Rendah f'c 15 Lantai kerja m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22006 3 Beton Mutu tinggi f'c 30 pada Pile cap m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
30
KA22302 4 Pembesian baja ulir BJTD-40 kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA22006 5 Beton Mutu tinggi f'c 30 pada Abutmen m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22302 6 Pembesian baja ulir BJTD-40 kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA22006 7 Beton Mutu tinggi f'c 30 pada Pelat injak m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22302 8 Pembesian baja ulir BJTD-40 kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA22006 9 Beton Mutu tinggi f'c 30 pada Wing wall m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22302 10 Pembesian baja ulir BJTD-40 kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA22405 11 Bekisting untuk Pile cap m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?
KA22405 12 Bekisting untuk Abutmen m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?
KA22405 13 Bekisting untuk Pelat Injak m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?
KA22405 14 Bekisting untuk Wing wall m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?

Pekerjaan Abutmen A2
KA22701 1 Pasangan Batu Kosong m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22002 2 Beton Mutu Rendah f'c 15 Lantai kerja m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22006 3 Beton Mutu tinggif'c 30 pada Pile cap m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22302 4 Pembesian baja ulir BJTD-40 m3 #NAME? #NAME? 20
- #NAME? m3 #NAME? #NAME?
KA22006 5 Beton Mutu tinggi f'c 30 pada Abutmen kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA22302 6 Pembesian baja ulir BJTD-40 m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22006 7 Beton Mutu tinggi f'c 30 pada Pelat injak kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA22302 8 Pembesian baja ulir BJTD-40 m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22006 9 Beton Mutu tinggi f'c 30 pada Wing wall kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA22302 10 Pembesian baja ulir BJTD-40 m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22405 11 Bekisting untuk Pile cap kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA22405 12 Bekisting untuk Abutmen m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?
KA22405 13 Bekisting untuk Pelat Injak m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?
KA22405 14 Bekisting untuk Wing wall m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?

3. 'PEKERJAAN DECK
KA22008 1 Beton Mutu tinggi f'c 35 pada deck m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22302 2 Pembesian baja ulir BJTD-40 pada deck kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
10

4. 'I GIRDER
1 Pengadaan & Pemasangan I Girder L = 40 m bh #NAME? #NAME? - #NAME? bh #NAME? #NAME?
KA22008 2 Beton K.350 Pada Diafragma I girder Tepi m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22302 3 Pembesian baja ulir BJTD-40 pada Diafragma I Girder Tepi kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA22008 4 Beton K.350 Pada Diafragma I girder Tengah m3 #NAME? #NAME? - #NAME? m3 #NAME? #NAME?
KA22302 5 Pembesian baja ulir BJTD-40 pada Diafragma I Girder Tenga kg #NAME? #NAME? - #NAME? kg #NAME? #NAME?
KA22008 6 Beton K.350 Pada Rc Plat bh #NAME? #NAME? - #NAME? bh #NAME? #NAME?
KA22405 7 Bekisting untuk diagframa m2 #NAME? #NAME? - #NAME? m2 #NAME? #NAME?

5. 'BEARING
Pekerjaan Pengadaan & Pemasangan Bearing
KA227027 1 Pengadaan dan pemasangan elastomer bearing bh #NAME? #NAME? - #NAME? bh #NAME? #NAME?

6. 'EXPANSION JOINT
Pekerjaan Pengadaan & Pemasangan Expansion Joint
1 Aspalthic Join m' #NAME? #NAME? 0 - #NAME? m' #NAME? #NAME?

BOBOT RENCANA MINGGUAN : 0.10408 0.13485 0.08233 0.08233 0.01766 0.01766 0.01766 0.01766 0.80689 0.80689 0.80689 BOBOT S/D MGG 11 KONTRAK 2.05980
#NAME? #NAME? 0.72892 0.65765 0.65765 0.65765 0.58471 0.58471 0.48283 0.64468 0.64556 0.64556 0.67525 0.67525
BOBOT KOMULATIF RENCANA MINGGUAN : 0 0.10408 0.23893 0.32127 0.40360 0.42126 0.43892 0.45657 0.47423 1.28112 2.08800 2.89489 2.05980 2.78872 3.44637 4.10402 4.76167 5.34638 5.93109 6.41392 7.05860 7.70417 8.34973 9.02498 9.70023
BOBOT REALISASI MINGGUAN : 0 0.00000 0.00089 0.00445 0.00289 0.02451 0.08435 0.10977 0.93832 0.19340 0.17848 0.52273 BOBOT S/D MGG 11 ADEDNDUM 7.92061 8.05932 12.04689 0.60500 0.2241184 0.0042459 0.0042461 0.1142995 0.2389351 0.17170 0.0059134 0.0042502
2.03259
BOBOT KOMULATIF REALISASI MINGGUAN : 0 0.00000 0.00089 0.00535 0.00824 0.03275 0.11710 0.22687 1.16519 1.35859 1.53707 2.05980 2.03259 9.95319 18.01252 30.05941 30.66440 30.88852 30.89277 30.89701 31.01131 31.25025 31.42195 31.42786 31.43211
DEVIASI : -0.10408 -0.23804 -0.31592 -0.39536 -0.38850 -0.32182 -0.22970 0.69096 0.07748 -0.55093 -0.83509 DEVIASI 0.02721 7.16447 14.56614 25.95538 25.90273 25.54214 24.96168 24.48310 23.95271 23.54608 23.07221 22.40288 21.73188

: MENGETAHUI
DIVISI TEKNIK
BALAI TEKNIK PERKERETAAPIAN
WILAYAH SUMATERA BAGIAN UTARA
PPK WILAYAH ACEH

Hendri Utama
Pengawas Paket
TIME SCHEDULLE
Pembangunan Jalan KA Antara Langsa - Besitang KM 441+000 s.d 444+000

WAKTU PELAKSANAAN
MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65
12/02/2018 19/02/2018 26/02/2018 05/03/2018 12/03/2018 19/03/2018 26/03/2018 02/04/2018 09/04/2018 16/04/2018 23/04/2018 30/04/2018 07/05/2018 14/05/2018 21/05/2018 28/05/2018 04/06/2018 11/06/2018 18/06/2018 25/06/2018 02/07/2018 09/07/2018 16/07/2018 23/07/2018 30/07/2018 06/08/2018 13/08/2018 20/08/2018 27/08/2018 03/09/2018 10/09/2018 17/09/2018 24/09/2018 01/10/2018 08/10/2018 15/10/2018 22/10/2018 29/10/2018 05/11/2018 12/11/2018 19/11/2018 26/11/2018
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
18/02/2018 25/02/2018 04/03/2018 11/03/2018 18/03/2018 25/03/2018 01/04/2018 08/04/2018 15/04/2018 22/04/2018 29/04/2018 06/05/2018 13/05/2018 20/05/2018 27/05/2018 03/06/2018 10/06/2018 17/06/2018 24/06/2018 01/07/2018 08/07/2018 15/07/2018 22/07/2018 29/07/2018 05/08/2018 12/08/2018 19/08/2018 26/08/2018 02/09/2018 09/09/2018 16/09/2018 23/09/2018 30/09/2018 07/10/2018 14/10/2018 21/10/2018 28/10/2018 04/11/2018 11/11/2018 18/11/2018 25/11/2018 02/12/2018

0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211

0.00029 0.00029 0.00029


0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189 0.00189
0.00721 0.00721 0.00721

0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048
0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420

0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619 0.1619

0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578 0.41578
0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297 0.0297
0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431 0.0431
0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161 0.0161

0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393

0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152
0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094
0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144
0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072
0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525
0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028
0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861

- - - - -

0.09923 0.09923 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#NAME? #NAME? #NAME?


#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME?
#NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

0.81489 0.81489 0.91411 0.91382 0.91382 1.60145 1.60145 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
10.51511 11.33000 12.24411 13.15794 14.07176 15.67321 17.27465 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
0.0962885 0.1480664 0.106704 0.17744 0.89966 1.31904 1.29124 1.53401 1.00613 2.02173 0.00000
31.52840 31.67646 31.78317 31.96061 32.86027 34.17931 35.47055 37.00456 38.01069 40.05138 40.05563
21.01328 20.34646 19.53905 18.80267 18.78851 18.50610 18.19590 #NAME? #NAME? 13.89397 #NAME?

: DISETUJUI OLEH
KONSULTAN SUPERVISI

PT. HARAWANA CONSULTANT

Roldes Sitorus, ST
Pengawas
KET
MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU
MINGGU 99 MINGGU 100
66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 101 102 103
03/12/2018 10/12/2018 17/12/2018 24/12/2018 31/12/2018 07/01/2019 14/01/2019 21/01/2019 28/01/2019 04/02/2019 11/02/2019 18/02/2019 25/02/2019 04/03/2019 11/03/2019 18/03/2019 25/03/2019 01/04/2019 08/04/2019 15/04/2019 22/04/2019 29/04/2019 06/05/2019 13/05/2019 20/05/2019 27/05/2019 03/06/2019 10/06/2019 17/06/2019 24/06/2019 01/07/2019 08/07/2019 15/07/2019 22/07/2019 29/07/2019 05/08/2019 12/08/2019 19/08/2019
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
09/12/2018 16/12/2018 23/12/2018 30/12/2018 06/01/2019 13/01/2019 20/01/2019 27/01/2019 03/02/2019 10/02/2019 17/02/2019 24/02/2019 03/03/2019 10/03/2019 17/03/2019 24/03/2019 31/03/2019 07/04/2019 14/04/2019 21/04/2019 28/04/2019 05/05/2019 12/05/2019 19/05/2019 26/05/2019 02/06/2019 09/06/2019 16/06/2019 23/06/2019 30/06/2019 07/07/2019 14/07/2019 21/07/2019 28/07/2019 04/08/2019 11/08/2019 18/08/2019 24/08/2019

0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211 0.00211
0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074 0.0074

0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048 0.00048
0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420 0.00420

0.0050 0.0050

0.0039 0.0039

0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083 0.0083


0.1006 0.1006 0.1006 0.1006 0.1006 0.1006 0.1006 0.1006

0.0297 0.0297 0.0297

0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393 0.1393

0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152 0.0152
0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094 0.0094
0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144 0.0144
0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072 0.2072
0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525 0.2525
0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028 0.0028
0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861 0.1861

0.0986 0.0986 0.0986 0.0986


- - - - - - - -

- - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - -
- - - -
- - - -
- - - - - - - - -

0.00862 0.00862 0.00862 0.00862


0.00046 0.00046 0.00046 0.00046
0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992 0.0992

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?


#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

#NAME? #NAME? #NAME?

#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 0.69441 0.69441 0.69441 0.69487 0.69487 0.69487 0.69487 0.69441 0.69441 0.69441 0.69441 0.00679 0.00679 0.00679 0.00679 0.00679 0.12303 0.12303 0.12303 0.12303 0.12303 0.12303 0.13199 0.13199
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

Aceh Tamiang, 29 April 2018

: DIBUAT OLEH
KONTRAKTOR PELAKSANA

PT. DWIFARITA FAJARKHARISMA

Basuki Setyawan, ST
Site Manager
VOLUME MINGGU
Kode SATUAN BOBOT (%) SKALA MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 11 ADD KONTRAK BOBOT MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20 MINGGU 21 MINGGU 22 MINGGU 23
Uraian Sub Output / Sub Output 10
Komponen Sub Komponen Detail 04/09/2017 11/09/2017 18/09/2017 25/09/2017 02/10/2017 09/10/2017 16/10/2017 23/10/2017 30/10/2017 06/11/2017 13/11/2017 REALISASI S.D MINGGU 11 VOLUME ACTUAL SISA 20/11/2017 27/11/2017 04/12/2017 11/12/2017 18/12/2017 25/12/2017 01/01/2018 08/01/2018 15/01/2018 22/01/2018 29/01/2018 05/02/2018
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
10/09/2017 17/09/2017 24/09/2017 01/10/2017 08/10/2017 15/10/2017 22/10/2017 29/10/2017 05/11/2017 12/11/2017 19/11/2017 26/11/2017 03/12/2017 10/12/2017 17/12/2017 24/12/2017 31/12/2017 07/01/2018 14/01/2018 21/01/2018 28/01/2018 04/02/2018 11/02/2018

A UMUM

1.1. DESAIN, SURVEI, DAN PERIJINAN


100
1.1.1. DESAIN, SURVEI, DAN PERIJINAN
KA11001 1 Pengukuran topography m2 90,000.00 0.2718 0.0688 0.0688 0.0688 0.0688 0.07464 90,000.00 m2 0.2718 0.1972 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214
KA11002 2 Pembuatan shop drawing dan asbuilt drawing set 2.00 0.0686 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.00869 2.00 set 0.0686 0.0599

KA11004 3 Penyelidikan tanah


a. DCP ttk 30.00 0.0041 0.00008 0.00008 0.00008 0.00412 30.00 ttk 0.0041 -
b. Sand Cone ttk 400.00 0.0824 0.00164 0.00164 0.00164 - 400.00 ttk 0.0824 0.0824 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172
c. Plat Bearing ttk 60.00 0.0227 0.00045 0.00045 0.00045 - 60.00 ttk 0.0227 0.0227
d. Penyelidikan sampel quarry ttk 6.00 0.0165 0.0042 0.0042 0.0042 0.0042 0.00556 6.00 ttk 0.0165 0.0109 0.00182 0.00182 0.00182 0.00182 0.00182 0.00182
e. Soundering test ttk ttk
1.2. MANAJEMEN LAPANGAN
1.2.1. ADMINISTRASI LAPANGAN
KA12002 1 Dokumentasi bln 22.00 0.0453 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00045 0.00491 22.00 bln 0.0453 0.0404 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044
2 Jaga malam,peralatan kerja dan mesin - mesin oh 4,320.00 0.3914 - 4,320.00 oh 0.3914 0.3914 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425
1.2.2. OPERASIONAL KANTOR LAPANGAN
KA12101 1 Membuat dan membongkar direksi keet, los kerja, dan guda m2 108.00 0.0700 0.0177 0.0177 0.05914 108.00 m2 0.0700 0.0109
KA12102 2 Papan nama pekerjaan m2 4.00 0.003956 0.0040 0.00401 4.00 m2 0.0040 - 0.00005 - 0.00005
KA12111 3 Operasional direksikeet set 1.00 0.0343 0.0348 0.02608 1.00 set 0.0343 0.0082

1.3. MOBILISASI DAN DEMOBILISASI


1.3.1. MOBILISASI DAN DEMOBILISASI PERALATAN BERAT
KA15001 1 Mobilisasi dan demobilisasi Peralatan Berat pkt 1.00 0.1373 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.0087 0.06954 1.00 pkt 0.1373 0.0677
KA21207 2 Perbaikan jalan akses masyarakat m2 3,600.00 0.7477 - 3,600.00 m2 0.7477 0.7477
3. Relokasi tiang PLN ttk 14.00 0.2044 14.00 ttk 0.2044 0.2044 0.1022 0.1022
B JALUR DAN BANGUNAN
2.1. SIPIL

2.1.1 Pekerjaan Persiapan


KA121001 1 Pembersihan lapangan dan perataan m2 150,000.00 0.5972 0.0465 0.0465 0.0465 0.28694 150,000.00 m2 0.5972 0.3102 0.03878 0.03878 0.03878 0.03878 0.03878 0.03878 0.03878 0.03878
2 Pembongkaran bangunan m2 1,920.00 0.7040 1,920.00 m2 0.7040 0.7040 0.17601 0.17601 0.17601 0.17601
2.1.2. PERBAIKAN TANAH DASAR
KA21101 1 Perkuatan dengan geotekstile m2 16,000.00 5.2409 0.1106 0.1106 0.1106 - 16,000.00 m2 5.2409 5.2409 0.2096 0.2096 0.2096 0.2096 0.2096

2.1.2. KONSTRUKSI TUBUH BAAN


KA21201 1 Stripping / pengupasan lapisan tanah dasar mak 50cm m2 34,000.00 0.6815 0.0197 0.0197 0.0197 0.56679 34,000.00 m2 0.6815 0.1147 0.1147
KA21206 2 Timbunan dengan material tanah pilihan m3 106,450.14 15.4027 0.30599 0.30599 0.30599 0.51310 106,450.14 m3 15.4027 14.8896 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634
70
KA21207 3 Timbunan dengan sirtu (sub balas) m3 8,505.00 1.6194 - 8,505.00 m3 1.6194 1.6194 0.0345 0.0345
KA21212 4 Galian tanah dengan alat berat m3 176,330.70 11.0141 0.2325 0.2325 0.2325 0.07229 176,330.70 m3 11.0141 10.9419 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735
KA21209 5 Membuang Tanah sejauh 30 m m3 176,330.70 4.2120 0.0889 0.0889 0.0889 0.01075 176,330.70 m3 4.2120 4.2013 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025

2.1.2. DRAINASE
KA21403 1 Drainase beton pracetak 80x80 cm tebal 10 cm m' 2,000.00 4.6967 - 2,000.00 m' 4.6967 4.6967

2 Retaining wall
KA21212 Galian Tanah m3 5,700.00 0.3560 - 5,700.00 m3 0.3560 0.3560
KA22701 Pasangan batu kosong m3 1,140.00 0.4521 - 1,140.00 m3 0.4521 0.4521
KA22002 Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m2 570.00 0.6910 - 570.00 m2 0.6910 0.6910
KA22004 Beton mutu f'c = 21,7 Mpa (K250), slump (12+2) cm, w/c = 0,56 m3 5,236.88 6.8550 - 5,236.88 m3 6.8550 6.8550
KA22302 Pembesian dengan besi ulir m3 442,379.13 8.4415 - 442,379.13 m3 8.4415 8.4415
KA21210 Urugan pasir m3 1,140.00 0.2671 - 1,140.00 m3 0.2671 0.2671
KA22405 Bekisting m2 6,812.29 3.6697 - 6,812.29 m2 3.6697 3.6697

2.2 JALAN REL


2.2.1. MATERIAL JALAN KA
KA23017 1 Angkutan rel ton 324.00 0.3991 - 324.00 ton 0.3991 0.3991
KA23018 2 Bantalan Kayu untuk MJ lengkap dengan aksesoris ttk 40.00 0.5434 - 40.00 ttk 0.5434 0.5434

KA23019 3 Ecer Bantalan Beton Beserta alat penambat btg 5,001.00 0.2561 - 5,001.00 btg 0.2561 0.2561

2.2.2. KONSTRUKSI JALAN KA


KA23101 1 Pengadaan dan pengeceran balas m3 5,550.00 2.6804 - 5,550.00 m3 2.6804 2.6804

KA23110 2 Pemasangan track R.54 dengan pemecokan awal m'sp 3,000.00 0.9567 - 3,000.00 m'sp 0.9567 0.9567
KA23111 3 MTT msp 3,000.00 0.5440 - 3,000.00 msp 0.5440 0.5440
KA23112 4 PBR msp 3,000.00 0.0288 - 3,000.00 msp 0.0288 0.0288
KA23118 5 Pengelasan flash butt R.54 titik 200.00 0.9472 - 200.00 titik 0.9472 0.9472

2.3. PENDUKUNG JALUR DAN BANGUNAN


2.3.1. PAPAN INFORMASI KONSTRUKSI 50

KA25401 1 Patok KM-HM buah 30.00 0.0349 - 30.00 buah 0.0349 0.0349
KA25407 2 Tanda-tanda lintas set 1.00 0.0019 - 1.00 set 0.0019 0.0019
KA21504 3 Pemasangan pagar sterilisasi panel beton t=120 cm m' 6,000.00 9.6388 50 - 6,000.00 m' 9.6388 9.6388

2.7. JEMBATAN

1 Underpass akses masyarakat uk. 6x5,5 (2 unit)


2 Box Culvert uk. 4x4 (1 unit)
3 Jembatan Perlintasan Jalan Nasional
1. 'PEKERJAAN PONDASI
2. PEKERJAAN ABUTMEN
3. 'PEKERJAAN DECK
4. 'I GIRDER
5. 'BEARING
6. 'EXPANSION JOINT

Box Culvert uk. 1x1 (2 unit)


KA21212 Galian Tanah m3
KA22701 Pasangan batu kosong m3
KA22002 Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3
KA22004 Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3
KA22302 Pembesian dengan besi ulir kg
KA21210 Urugan pasir m3
KA22405 Structural Backfill m3
KA22405 Bekisting m2

Box Culvert Uk. 2x2 (12 unit)


KA21212 Galian Tanah m3
KA22701 Pasangan batu kosong m3
KA22002 Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3
KA22004 Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3
KA22302 Pembesian dengan besi ulir kg
KA21210 Urugan pasir m3
KA22405 Structural Backfill m3
KA22405 Bekisting m2

Underpass Warga 4x4 (1 unit)


KA21212 Galian Tanah m3
KA22701 Pasangan batu kosong m3
KA22002 Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3
KA22004 Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3
KA22302 Pembesian dengan besi ulir kg
KA21210 Urugan pasir m3
KA22405 Structural Backfill m3
KA22405 Bekisting m2

Box Culvert Uk. 4x4x2 (1 unit)


KA21212 Galian Tanah m3
KA22701 Pasangan batu kosong m3
KA22002 Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3
KA22004 Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3
KA22302 Pembesian dengan besi ulir kg
KA21210 Urugan pasir m3
KA22405 Structural Backfill m3
KA22405 Bekisting m2

Box Culvert Uk. 6x4x2 (1 unit)


KA21212 Galian Tanah m3
KA22701 Pasangan batu kosong m3
KA22002 Beton mutu f'c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 m3
KA22004 Beton mutu f'c = 31,2 Mpa (K350), slump (12+2) cm, w/c = 0,48 m3
KA22302 Pembesian dengan besi ulir kg
KA21210 Urugan pasir m3
KA22405 Structural Backfill m3
KA22405 Bekisting m2

BOBOT RENCANA MINGGUAN : 0.10408 0.13485 0.08233 0.08233 0.01766 0.01766 0.01766 0.01766 0.80689 0.80689 0.80689 BOBOT S/D MGG 11 KONTRAK 83.03 81.32627 1.00213 0.88751 0.88751 0.88751 0.81370 0.81370 0.70969 0.91932 0.88054 0.88054 0.91500 0.91500
2.05980
BOBOT KOMULATIF RENCANA MINGGUAN : 0 0.10408 0.23893 0.32127 0.40360 0.42126 0.43892 0.45657 0.47423 1.28112 2.08800 2.89489 2.05980 3.06193 3.94945 4.83696 5.72447 6.53817 7.35188 8.06156 8.98088 9.86143 10.74197 11.65697 12.57197

BOBOT REALISASI MINGGUAN : 0 0.00000 0.00089 0.00445 0.00289 0.02451 0.08435 0.10977 0.93831998 0.19340 0.17848 0.52273 BOBOT S/D MGG 11 ADEDNDUM 14.72893 9.14805 4.14984 0.60500 0.224118367 0.004245882 0.0042460879 0.1142995229 0.2389351383 0.17170 0.0059133922 0.0042502292
2.03259
BOBOT KOMULATIF REALISASI MINGGUAN : 0 0.00000 0.00089 0.00535 0.00824 0.03275 0.11710 0.22687 1.16519 1.35859 1.53707 2.05980 2.03259 16.76152 16.76152 25.90957 30.05941 30.66441 30.88853 30.89277 30.89702 31.01132 31.25025 31.42195 31.42786 31.43211

DEVIASI : -0.10408 -0.23804 -0.31592 -0.39536 -0.38850 -0.32182 -0.22970 0.69096 0.07748 -0.55093 -0.83509 DEVIASI 0.02721 13.69958 21.96012 25.22245 24.93994 24.35035 23.54090 22.83546 22.03043 21.38883 20.67998 19.77090 18.86015

Mengetahui
BALAI TEKNIK PERKERETAAPIAN
WILAYAH SUMATERA BAGIAN UTARA
PPK ACEH

Hendri Utama
Pengawas Paket
KURVA S
Pembangunan Jalan KA Antara Langsa - Besitang KM 441+000 s.d 444+000
BSL -10
WAKTU PELAKSANAAN
MINGGU 24 MINGGU 25 MINGGU 26 MINGGU 27 MINGGU 28 MINGGU 29 MINGGU 30 MINGGU 31 MINGGU 32 MINGGU 33 MINGGU 34 ADD KONTRAK BOBOT MINGGU 35 MINGGU 36 MINGGU 37 MINGGU 38 MINGGU 39 MINGGU 40 MINGGU 41 MINGGU 42 MINGGU 43 MINGGU 44 MINGGU 45 MINGGU 46 MINGGU 47 MINGGU 48 MINGGU 49 MINGGU 50 MINGGU 51 MINGGU 52 MINGGU 53 MINGGU 54 MINGGU 55 MINGGU 56 MINGGU 57 MINGGU 58 MINGGU 59 MINGGU 60 MINGGU 61
REALISASI
12/02/2018 19/02/2018 26/02/2018 05/03/2018 12/03/2018 19/03/2018 26/03/2018 02/04/2018 09/04/2018 16/04/2018 23/04/2018 S.D MINGGU VOLUME ACTUAL 30/04/2018 07/05/2018 14/05/2018 21/05/2018 28/05/2018 04/06/2018 11/06/2018 18/06/2018 25/06/2018 02/07/2018 09/07/2018 16/07/2018 23/07/2018 30/07/2018 06/08/2018 13/08/2018 20/08/2018 27/08/2018 03/09/2018 10/09/2018 17/09/2018 24/09/2018 01/10/2018 08/10/2018 15/10/2018 22/10/2018 29/10/2018
SISA
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d 34 VOL SAT BOBOT s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
18/02/2018 25/02/2018 04/03/2018 11/03/2018 18/03/2018 25/03/2018 01/04/2018 08/04/2018 15/04/2018 22/04/2018 29/04/2018 06/05/2018 13/05/2018 20/05/2018 27/05/2018 03/06/2018 10/06/2018 17/06/2018 24/06/2018 01/07/2018 08/07/2018 15/07/2018 22/07/2018 29/07/2018 05/08/2018 12/08/2018 19/08/2018 26/08/2018 02/09/2018 09/09/2018 16/09/2018 23/09/2018 30/09/2018 07/10/2018 14/10/2018 21/10/2018 28/10/2018 04/11/2018

0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.00214 0.19787 90,000.00 m2 0.25443 0.05656 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082
0.03212 2.00 set 0.06425 0.03212

- - - 0.00385 30.00 ttk 0.00385 -


0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.00172 0.02679 400.00 ttk 0.07710 0.05031
- 60.00 ttk 0.02120 0.02120
0.00514 6.00 ttk 0.01542 0.01028 0.00171 0.00171 0.00171 0.00171 0.00171 0.00171
0.02409 10.00 ttk 0.02409 - -

0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.00044 0.01371 24.00 bln 0.04626 0.03255 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047
0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.00425 0.12111 720.00 oh 0.36638 0.24527 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355

0.05463 108.00 m2 0.06556 0.01093


0.00370 4.00 m2 0.00370 -
0.03212 1.00 set 0.03212 -

0.0642 1.00 pkt 0.12850 0.06425


- 3,600.00 m2 0.69991 0.69991
0.1913 14.00 ttk 0.19132 -

0.26509 71138.2008 m2 0.26509 -


0.65899 1920.00 m2 0.65899 -

0.2096 0.2096 0.2096 0.2096 0.2096 0.2096 0.2096 0.2096 0.2096 0.2096 0.2096 2.91269 12,500.00 m2 3.83249 0.91980

0.52363 27,910.93 m2 0.52363 -


0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 0.28634 13.58909 155,308.556 m3 21.03472 7.44562
0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 0.0345 - 8,214.25 m3 1.46401 1.46401
0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.2735 0.92255 36,035.35 m3 2.10688 1.18434
0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.1025 0.34888 36,035.35 m3 0.80571 0.45683

0.0839 0.0839 0.0839 0.0839 0.0839 0.0839 0.0839 0.0839 0.0839 0.0839 0.0839 - 3,351.00 m' 7.36586 7.36586 - -

0.0057 0.0057 0.0057 0.0057 0.0057 0.0057 0.27922 15,004.76 m3 0.87729 0.59807 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120
0.0073 0.0073 0.0073 0.0073 0.0073 0.0073 0.31404 1,436.76 m3 0.53337 0.21933 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044
0.0111 0.0111 0.0111 0.0111 0.0111 0.0111 0.43022 718.38 m2 0.81511 0.38488 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069
0.1106 0.1106 0.1106 0.1106 0.1106 0.1106 3.15151 9,520.03 m3 11.66433 8.51281 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520
0.1362 0.1362 0.1362 0.1362 0.1362 0.1362 6.32121 809,155.34 kg 14.45265 8.13144 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452
0.0043 0.0043 0.0043 0.0043 0.0043 0.0043 0.08317 718.38 m3 0.15758 0.07441 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
0.0592 0.0592 0.0592 0.0592 0.0592 0.0592 2.43521 20,652.24 m2 10.41350 7.97829 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425

- 324.00 ton 0.37354 0.37354


- 40.00 ttk 0.50863 0.50863
- 4834.00 btg 0.23169 0.23169

- 4785.00 m3 2.16311 2.16311


- 2900.00 m'sp 0.86566 0.86566
- 2900.00 msp 0.49227 0.49227
- 2900.00 msp 0.02609 0.02609
- 192.00 titik 0.85118 0.85118

- 30.00 buah 0.03266 0.03266


- 1.00 set 0.00175 0.00175
0.20081 0.20081 0.2008 0.2008 0.2008 0.2008 0.2008 0.2008 0.2008 4.51110 3,000.00 m' 4.51110 -

- 84.49 m3 0.00494 0.00494 0.00247 0.00247


- 6.60 m3 0.00245 0.00245 0.00245
- 3.30 m3 0.00374 0.00374 0.00374
- 80.48 m3 0.11073 0.11073 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384 0.01384
- 7,034.97 kg 0.12565 0.12565 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571 0.01571
- 3.30 m3 0.00072 0.00072 0.00072
- 64.35 m3 0.00710 0.00710 0.00355 0.00355
- 347.64 m2 0.17529 0.17529 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191 0.02191

- 2,488.42 m3 0.14549 0.14549 0.03637 0.03637


- 126.10 m3 0.04681 0.04681 0.00585 0.00585
- 63.05 m3 0.07154 0.07154 0.00511 0.00511
- 1,148.23 m3 1.57978 1.57978 0.06319 0.06319
- 124,190.18 kg 2.21821 2.21821 0.08873 0.08873
- 63.05 m3 0.01383 0.01383 0.00173 0.00173
- 1,109.44 m3 0.12246 0.12246
- 4,315.16 m2 2.17584 2.17584 0.08703 0.08703

- 158.08 m3 0.00924 0.00924


- 12.74 m3 0.00473 0.00473
- 6.37 m3 0.00723 0.00723
- 166.19 m3 0.22865 0.22865
- 19,806.47 kg 0.35377 0.35377
- 6.37 m3 0.00140 0.00140
- 200.85 m3 0.02217 0.02217
- 493.07 m2 0.24862 0.24862

- 420.86 m3 0.02461 0.02461


- 40.48 m3 0.01503 0.01503
- 20.24 m3 0.02297 0.02297
- 346.40 m3 0.47660 0.47660
- 38,738.53 kg 0.69192 0.69192
- 20.24 m3 0.00444 0.00444
- 339.90 m3 0.03752 0.03752
- 1,005.77 m2 0.50714 0.50714

- 138.15 m3 0.00808 0.00808


- 34.08 m3 0.01265 0.01265
- 17.04 m3 0.01933 0.01933
- 352.28 m3 0.48468 0.48468
- 23,923.23 kg 0.42730 0.42730
- 17.04 m3 0.00374 0.00374
- 185.40 m3 0.02046 0.02046
- 1,071.23 m2 0.54015 0.54015

0.99887 0.99887 1.19968 1.19968 1.19968 1.53407 1.53407 1.53407 1.53407 1.53407 1.53407 BOBOT S/D 100.00 62.48267 0.47096 0.47096 0.47096 0.47096 0.47096 0.47096 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.46924 0.47171 0.47489 0.52445 0.52070 0.52070 0.52070 0.52070 0.52070 0.52070 0.52425 0.76081 0.75726
MGG 34 40.05563
13.57083 14.56970 15.76938 16.96905 18.16873 19.70280 21.23687 22.77094 24.30501 25.83908 27.37315 KONTRAK 37.51733 37.98828 38.45924 38.93020 39.40115 39.87211 40.34307 40.81231 41.28155 41.75080 42.22004 42.68929 43.15853 43.62777 44.09702 44.56626 45.03797 45.51286 46.03731 46.55801 47.07871 47.59941 48.12012 48.64082 49.16152 49.68578 50.44659 51.20385
ADD 1
0.0962884709 0.1480664149 0.1067039507 0.17744 0.90731 1.31701 1.30047 1.53812 1.00613 2.02172 0.00425 BOBOT S/D 1.22778 2.42714 1.61501 1.57979 0.80105 0.86436 0.00398 0.00398 1.56349 1.14925 0.59724 0.59723 1.63629 1.88968 2.32309 1.86242 1.81439 11.27003 0.01230 0.00398 0.10045 0.12676 0.00398 0.03614 0.00000
MGG 34 37.51733
31.52840 31.67647 31.78317 31.96062 32.86793 34.18494 35.48541 37.02353 38.02966 40.05138 40.05563 ADEDNDUM 37.517327486 38.74510 41.17223 42.78725 44.36705 45.16808 46.03245 46.03642 46.04041 47.60390 48.75314 49.35038 49.94761 51.58390 53.47358 55.79667 57.65909 59.47348 70.74351 70.75581 70.75979 70.86024 70.98701 70.99099 71.02712 71.02712
2
17.95757 17.10677 16.01380 14.99157 14.69920 14.48214 14.24855 14.25259 13.72465 14.21230 12.68248 DEVIASI 2.53830 0.75681 2.71298 3.85706 4.96589 5.29597 5.68939 5.22412 4.75886 5.85310 6.53310 6.66110 6.78909 7.95613 9.37657 11.23041 12.62112 13.96062 24.70620 24.19780 23.68108 23.26083 22.86689 22.35017 21.86559 21.34134

Disetujui Oleh
KONSULTAN SUPERVISI
PT. HARAWANA CONSULTANT

Roldes Sitorus, ST
Pengawas
KET
MINGGU 62 MINGGU 63 MINGGU 64 MINGGU 65 MINGGU 66 MINGGU 67 MINGGU 68 MINGGU 69 MINGGU 70 MINGGU 71 MINGGU 72 MINGGU 73 MINGGU 74 MINGGU 75 MINGGU 76 MINGGU 77 MINGGU 78 MINGGU 79 MINGGU 80 MINGGU 81 MINGGU 82 MINGGU 83 MINGGU 84 MINGGU 85 MINGGU 86 MINGGU 87 MINGGU 88 MINGGU 89 MINGGU 90 MINGGU 91 MINGGU 92 MINGGU 93 MINGGU 94 MINGGU 95 MINGGU 96 MINGGU 97 MINGGU 98 MINGGU 99 MINGGU 100 MINGGU 101 MINGGU 102 MINGGU 103
05/11/2018 12/11/2018 19/11/2018 26/11/2018 03/12/2018 10/12/2018 17/12/2018 24/12/2018 31/12/2018 07/01/2019 14/01/2019 21/01/2019 28/01/2019 04/02/2019 11/02/2019 18/02/2019 25/02/2019 04/03/2019 11/03/2019 18/03/2019 25/03/2019 01/04/2019 08/04/2019 15/04/2019 22/04/2019 29/04/2019 06/05/2019 13/05/2019 20/05/2019 27/05/2019 03/06/2019 10/06/2019 17/06/2019 24/06/2019 01/07/2019 08/07/2019 15/07/2019 22/07/2019 29/07/2019 05/08/2019 12/08/2019 19/08/2019
s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d s.d
11/11/2018 18/11/2018 25/11/2018 02/12/2018 09/12/2018 16/12/2018 23/12/2018 30/12/2018 06/01/2019 13/01/2019 20/01/2019 27/01/2019 03/02/2019 10/02/2019 17/02/2019 24/02/2019 03/03/2019 10/03/2019 17/03/2019 24/03/2019 31/03/2019 07/04/2019 14/04/2019 21/04/2019 28/04/2019 05/05/2019 12/05/2019 19/05/2019 26/05/2019 02/06/2019 09/06/2019 16/06/2019 23/06/2019 30/06/2019 07/07/2019 14/07/2019 21/07/2019 28/07/2019 04/08/2019 11/08/2019 18/08/2019 24/08/2019

0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082
0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040 0.0040

0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020 0.0020
0.0042 0.0042 0.0042 0.0042 0.0042

0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047 0.00047
0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355 0.00355

0.0055 0.0055

- -

0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080 0.0080


0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875 0.0875

0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511 0.0511

0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136 0.4136
0.3660 0.3660 0.3660 0.3660
0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474 0.0474
0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183 0.0183

0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946 0.2946

0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120 0.0120
0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044 0.0044
0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069 0.0069
0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520 0.1520
0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452 0.1452
0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015
0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425 0.1425

0.0934 0.0934 0.0934 0.0934


0.1272 0.1272 0.1272 0.1272
0.0463 0.0463 0.0463 0.0463 0.04634

0.54078 0.54078 0.54078 0.54078


0.17313 0.17313 0.17313 0.17313 0.17313
0.09845 0.09845 0.09845 0.09845 0.09845
0.00522 0.00522 0.00522 0.00522 0.00522
0.17024 0.17024 0.17024 0.17024 0.17024

0.0163 0.0163
0.0009 0.0009

0.03637 0.03637
0.00585 0.00585 0.00585 0.00585 0.00585 0.00585
0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511 0.00511
0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319 0.06319
0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873 0.08873
0.00173 0.00173 0.00173 0.00173 0.00173 0.00173
0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225
0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703 0.08703

0.00462 0.00462
0.00236 0.00236
0.00361 0.00361
0.05716 0.05716 0.05716 0.05716
0.08844 0.08844 0.08844 0.08844
0.00070 0.00070
0.00739 0.00739 0.00739
0.06215 0.06215 0.06215 0.06215

0.01230 0.01230
0.00751 0.00751
0.01148 0.01148
0.11915 0.11915 0.11915 0.11915
0.17298 0.17298 0.17298 0.17298
0.00222 0.00222
0.01251 0.01251 0.01251
0.12679 0.12679 0.12679 0.12679

0.00404 0.00404
0.00633 0.00633
0.00967 0.00967
0.12117 0.12117 0.12117 0.12117
0.10683 0.10683 0.10683 0.10683
0.00187 0.00187
0.00682 0.00682 0.00682
0.13504 0.13504 0.13504 0.13504

0.75726 0.75726 0.72089 0.72089 0.72089 0.72857 1.29466 1.28697 1.29075 1.29075 1.10503 1.52803 1.50089 1.96666 1.96666 1.55998 1.93242 1.92018 1.91734 1.91734 1.55430 1.54748 1.54748 1.29069 1.29069 1.29069 1.27845 1.27845 1.28269 1.20213 1.46901 0.64197 0.64197 0.81250 0.69150 1.09220 1.09220 0.55142 0.55142 0.56863 0.12705 0.10984

51.96111 52.71837 53.43925 54.16014 54.88103 55.60960 56.90426 58.19123 59.48198 60.77273 61.87776 63.40579 64.90668 66.87334 68.84000 70.39997 72.33239 74.25257 76.16990 78.08724 79.64154 81.18903 82.73651 84.02720 85.31789 86.60858 87.88703 89.16548 90.44816 91.65029 93.11930 93.76127 94.40324 95.21575 95.90724 96.99944 98.09164 98.64306 99.19448 99.76311 99.89016 100.000

Aceh Tamiang, 13 Januari 2019


Dibuat dan Dihitung Oleh
KONTRAKTOR PELAKSANA
PT. DWIFARITA FAJARKHARISMA

Basuki Setyawan, ST
Site Manager
LAPORAN MINGGUAN PELAKSANAAN
REKAPITULASI TENAGA KERJA
PEKERJAAN : Pembangunan Jalan KA Antara Langsa - Besitang
KM. 441 + 000 s/d KM. 444 + 000
KODE PAKET : BSL - 10 MINGGU KE : 153 ( SERATUS LIMA PULUH TIGA )

KEMENTERIAN / INSTANSI : KEMENTERIAN PERHUBUNGAN


DIREKTORAT JENDERAL PERKERETAAPIAN TANGGAL :: 03 Agustus 2020
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA s.d
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA : 09 Agustus 2020
NO.KONTRAK : 10/SP/SP-BSL/BTP-SBU/IX/2017
TANGGAL : 04 September 2017
NOMER KONTRAK ADD1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMER KONTRAK ADD8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMER KONTRAK ADD9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JANGKA WAKTU : 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN PENGAWAS : PT. HARAWANA CONSULTANT

REALISASI S/D REALISASI


REALISASI S/D MINGGU INI
MINGGU LALU MINGGU INI
NO URAIAN PEKERJAAN
OH OH OH

1 2 3 4 5
1 Minggu Ke 153 Dari Tanggal 03 Agustus 2020 s/d 09 Agustus 2020 27,214.00 338.00 27,552.00
2
3
4
5
6
7
8
9
10

Aceh Tamiang 09 Agustus 2020


MENGETAHUI : : Dibuat Oleh
BALAI PERKERETAAPIAN KONTRAKTOR PELAKSANA
KELAS II WILAYAH SUMATERA BAGIAN
UTARA PEJABAT PEMBUAT KOMITMEN PT. DWIFARITA FAJARKHARISMA
ACEH WILAYAH II

Basuki Setyawan, ST
Indra Gunawan
Pengawas Pekerjaan Tubuh Baan dan Bangunan Site Manager
LAPORAN MINGGUAN PELAKSANAAN
REKAPITULASI MATERIAL
PEKERJAAN : Pembangunan Jalan KA Antara Langsa - Besitang
KM. 441 + 000 s/d KM. 444 + 000
KODE PAKET : BSL - 10 MINGGU KE : 153 ( SERATUS LIMA PULUH TIGA )

KEMENTERIAN / INSTANSI : KEMENTERIAN PERHUBUNGAN


DIREKTORAT JENDERAL PERKERETAAPIAN TANGGAL :: 03 Agustus 2020
BALAI TEKNIK PERKERETAAPIAN KELAS II WILAYAH SUMATERA BAGIAN UTARA s.d
KONTRAKTOR : PT. DWIFARITA FAJARKHARISMA : 09 Agustus 2020
NO.KONTRAK : 10/SP/SP-BSL/BTP-SBU/IX/2017
TANGGAL : 04 September 2017
NOMER KONTRAK ADD1 : 10/ADD1/ SP- BSL/BTP-SBU/XI/2017
TANGGAL : 20 Nopember 2017
NOMER KONTRAK ADD2 : 08/ADD2/ SP- BSL/BTP-SBU/IV/2018
TANGGAL : 23 April 2018
NOMER KONTRAK ADD3 : 10/ADD3/ SP- BSL/BTP-SBU/IV/2019
TANGGAL : 08 April 2019
NOMER KONTRAK ADD4 : 10/ADD4/ SP- BSL/BTP-SBU/VII/2019
TANGGAL : 29 Juli 2019
NOMER KONTRAK ADD5 : 10/ADD5/ SP- BSL/BTP-SBU/VIII/2019
TANGGAL : 07 Agustus 2019
NOMER KONTRAK ADD6 : 10/ADD6/ SP- BSL/BTP-SBU/X/2019
TANGGAL : 28 Oktober 2019
NOMER KONTRAK ADD7 : 10/ADD7/ SP- BSL/BTP-SBU/XII/2019
TANGGAL : 09 Desember 2019
NOMER KONTRAK ADD8 : 10/ADD8/ SP- BSL/BTP-SBU/IV/2020
TANGGAL : 06 April 2020
NOMER KONTRAK ADD9 : 10/ADD9/ SP- BSL/BTP-SBU/VII/2020
TANGGAL : 13 Juli 2020
JANGKA WAKTU : 1215 Hari Kalender ( 04 September 2017 s.d 31 Desember 2020 )
KONSULTAN PENGAWAS : PT. HARAWANA CONSULTANT

NO URAIAN PEKERJAAN

1 Senin,03 Agustus 2020 - - -

2 Selasa,04 Agustus 2020 - - -

3 Rabu,05 Agustus 2020 - - -

4 Kamis,06 Agustus 2020 - - -

5 Jumat,07 Agustus 2020 - - -

6 Sabtu,08 Agustus 2020 - - -

7 Minggu,09 Agustus 2020 - - -

Aceh Tamiang 09 Agustus 2020

MENGETAHUI : : Dibuat Oleh


BALAI PERKERETAAPIAN KONTRAKTOR PELAKSANA
KELAS II WILAYAH SUMATERA BAGIAN
UTARA PEJABAT PEMBUAT KOMITMEN PT. DWIFARITA FAJARKHARISMA
ACEH WILAYAH II

Indra Gunawan Basuki Setyawan, ST


Pengawas Pekerjaan Tubuh Baan dan Bangunan Site Manager

Anda mungkin juga menyukai