Anda di halaman 1dari 11

ANALISIS HARGA SATUAN UPAH DAN BAHAN

I. PEKERJAAN PERSIAPAN
1 10 m2 Pembersihan lokasi
0.750 Pekerja @ Rp. 85,000 = Rp. 63,750
0.025 PC @ Rp. 60,000 = Rp. 1,500
Sub Total ………………. ………….. = Rp. 65,250
Dibulatkan ………………. ………….. = Rp. 65,250

1 m2 Pembersihan lokasi 65,250 x 0.10 = Rp. 6,525

II PEKERJAAN PINTU DAN JEDELA


1 1 m3 Kayu Kozen Pintu dan Jendela (An. SNI)
1.200 m3 Kayu Jati @ Rp. 11,625,000 = Rp. 13,950,000
2.000 Kepala Tukang @ Rp. 95,000 = Rp. 190,000
18.000 Tukang Kayu @ Rp. 95,000 = Rp. 1,710,000
6.000 Pekerja @ Rp. 85,000 = Rp. 510,000
0.300 Mandor @ Rp. 100,000 = Rp. 30,000
Sub Total ………………. ………….. = Rp. 16,390,000
Dibulatkan ………………. ………….. = Rp. 16,390,000

2. 1 m3 Kayu Kozen Pintu dan jendela (An. SNI)


1.200 m3 Kayu Kamper @ Rp. 5,250,000 = Rp. 6,300,000
2.000 Kepala Tukang @ Rp. 95,000 = Rp. 190,000
18.000 Tukang Kayu @ Rp. 95,000 = Rp. 1,710,000
6.000 Pekerja @ Rp. 85,000 = Rp. 510,000
0.300 Mandor @ Rp. 100,000 = Rp. 30,000
Sub Total ………………. ………….. = Rp. 8,740,000
Dibulatkan ………………. ………….. = Rp. 8,740,000

3 1 m2 Daun Jendela kaca (kaca tidak dihitung) (An.SNI)


0.035 m3 Kayu Jati @ Rp. 11,902,000 = Rp. 416,570
0.200 Kepala Tukang @ Rp. 95,000 = Rp. 19,000
2.000 Tukang Kayu @ Rp. 95,000 = Rp. 190,000
0.800 Pekerja @ Rp. 85,000 = Rp. 68,000
0.040 Mandor @ Rp. 100,000 = Rp. 4,000
Sub Total ………………. ………….. = Rp. 697,570
Dibulatkan ………………. ………….. = Rp. 697,570

4 1 m2 Daun Jendela kaca (kaca tidak dihitung) (An.SNI)


0.035 m3 Kayu Kamper @ Rp. 5,500,000 = Rp. 192,500
0.200 Kepala Tukang @ Rp. 95,000 = Rp. 19,000
2.000 Tukang Kayu @ Rp. 95,000 = Rp. 190,000
0.800 Pekerja @ Rp. 85,000 = Rp. 68,000
0.040 Mandor @ Rp. 100,000 = Rp. 4,000
Sub Total ………………. ………….. = Rp. 473,500
Dibulatkan ………………. ………….. = Rp. 473,500

5 1 m1 Papan jalusi tebal 2 cm (An. Membuat)


0.003 m3 Kayu Kamper @ Rp. 5,500,000 = Rp. 16,500
0.150 Tukang Kayu @ Rp. 95,000 = Rp. 14,250
0.005 Pekerja @ Rp. 85,000 = Rp. 425
Sub Total ………………. ………….. = Rp. 31,175
Dibulatkan ………………. ………….. = Rp. 31,170
6 1 m2 Pasang kaca tebal 5 mm (An. Membuat)
1.000 m2 Kaca polos 5 mm @ Rp. 131,100 = Rp. 131,100
0.270 Tukang Kayu @ Rp. 95,000 = Rp. 25,650
0.027 Pekerja @ Rp. 85,000 = Rp. 2,295
Sub Total ………………. ………….. = Rp. 159,045
Dibulatkan ………………. ………….. = Rp. 159,040

7 1 m2 Daun pintu panil jati (An. Membuat)


0.030 m3 Kayu Jati @ Rp. 11,902,000 = Rp. 357,060
2.500 Tukang Kayu @ Rp. 95,000 = Rp. 237,500
1.000 Pekerja @ Rp. 85,000 = Rp. 85,000
Sub Total ………………. ………….. = Rp. 679,560
Dibulatkan ………………. ………….. = Rp. 679,560

III PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP


1 1 m2 Pasang Plafond dan gypsum baru (AN. SNI)
1.000 m3 Gypsum @ Rp. 70,000 = Rp. 70,000
0.010 kg Paku gypsum @ Rp. 30,000 = Rp. 300
0.100 kg Paku Plafond @ Rp. 24,500 = Rp. 2,450
0.012 m3 Kayu kamper 4/6 cm @ Rp. 5,260,000 = Rp. 63,120
0.032 Kepala Tukang @ Rp. 95,000 = Rp. 3,040
0.320 Tukang kayu @ Rp. 95,000 = Rp. 30,400
0.180 Pekerja @ Rp. 85,000 = Rp. 15,300
0.076 Mandor @ Rp. 100,000 = Rp. 7,600
Sub Total ………………. ………….. = Rp. 192,210
Dibulatkan ………………. ………….. = Rp. 192,210
2 1 m2 Pasang Plafond dan eternit baru (AN. SNI)
1.000 m2 Eternit @ Rp. 14,000 = Rp. 14,000
0.010 kg Paku eternit @ Rp. 18,000 = Rp. 180
0.100 kg Paku Plafond @ Rp. 24,500 = Rp. 2,450
0.012 m3 Kayu kamper 4/6 cm @ Rp. 5,260,000 = Rp. 63,120
0.032 Kepala Tukang @ Rp. 95,000 = Rp. 3,040
0.320 Tukang kayu @ Rp. 95,000 = Rp. 30,400
0.180 Pekerja @ Rp. 85,000 = Rp. 15,300
0.076 Mandor @ Rp. 100,000 = Rp. 7,600
Sub Total ………………. ………….. = Rp. 136,090
Dibulatkan ………………. ………….. = Rp. 136,090

3 1 m2 Pasang Eternit dengan rangka kayu lama (An. SNI)


1.000 m2 Eternit @ Rp. 14,000 = Rp. 14,000
0.010 kg Paku gypsum @ Rp. 30,000 = Rp. 300
0.100 kg Paku Plafond @ Rp. 24,500 = Rp. 2,450
0.032 Kepala Tukang @ Rp. 95,000 = Rp. 3,040
0.320 Tukang kayu @ Rp. 95,000 = Rp. 30,400
0.180 Pekerja @ Rp. 85,000 = Rp. 15,300
0.076 Mandor @ Rp. 100,000 = Rp. 7,600
Sub Total ………………. ………….. = Rp. 73,090
Dibulatkan ………………. ………….. = Rp. 73,090
4 1 m1 Pasang List Eternit
1.0000 m1 List eternit @ Rp. 4,500 = Rp. 4,500
0.025 kg Paku @ Rp. 24,500 = Rp. 613
0.100 Tukang kayu @ Rp. 95,000 = Rp. 9,500
0.050 Pekerja @ Rp. 85,000 = Rp. 4,250
Sub Total ………………. ………….. = Rp. 18,863
Dibulatkan ………………. ………….. = Rp. 18,860
5 1 m2 Pasang Listplank 3/30 (An. SNI)
0.0072 m3 Kayu Kamper @ Rp. 5,500,000 = Rp. 39,600
0.050 kg Paku @ Rp. 24,500 = Rp. 1,225
0.025 Kepala Tukang @ Rp. 95,000 = Rp. 2,375
0.200 Tukang kayu @ Rp. 95,000 = Rp. 19,000
0.100 Pekerja @ Rp. 85,000 = Rp. 8,500
0.005 Mandor @ Rp. 100,000 = Rp. 500
Sub Total ………………. ………….. = Rp. 71,200
Dibulatkan ………………. ………….. = Rp. 71,200

6 1 m1 Papan kompres lapis seng (An.SNI)


0.002 m3 Kayu bengkirai @ Rp. 3,500,000.00 ,- = 7,000.00
0.150 lbr Seng BJLS 30 @ Rp. 25,000.00 ,- = 3,750.00
0.100 kg Paku @ Rp. 16,000.00 ,- = 1,600.00
0.060 Kepala tukang kayu @ Rp. 95,000.00 ,- = 5,700.00
0.125 Tukang kayu @ Rp. 95,000.00 ,- = 11,875.00
0.050 Pekerja @ Rp. 85,000.00 ,- = 4,250.00
0.004 Mandor @ Rp. 100,000.00 ,- = 400.00
Sub Total Rp. 34,575.00
Dibulatkan Rp. 34,500.00
7 1 m1 Kayu papan Reuter tebal 3 cm (An Membuat)
0.004 m3 Kayu meranti @ Rp. 2,879,000.00 ,- = 11,516.00
0.002 kg Paku @ Rp. 24,500.00 ,- = 49.00
0.150 Tukang kayu @ Rp. 95,000.00 ,- = 14,250.00
0.028 Pekerja @ Rp. 85,000.00 ,- = 2,380.00
0.008 Mandor @ Rp. 100,000.00 ,- = 800.00
Sub Total Rp. 28,995.00
Dibulatkan Rp. 28,990.00

IV PEKERJAAN PLESTERAN
1. 1 m2 Siaran / Setrikan 1PC:2Psr (An. SNI)
0.162 Zak PC @ Rp. 52,000 = Rp. 8,424
0.020 m3 Pasir pasang @ Rp. 200,000 = Rp. 4,000
0.050 Kepala Tukang @ Rp. 95,000 = Rp. 4,750
0.100 Tukang Batu @ Rp. 95,000 = Rp. 9,500
0.150 Pekerja @ Rp. 85,000 = Rp. 12,750
0.001 Mandor @ Rp. 100,000 = Rp. 100
Sub Total ………………. ………….. = Rp. 39,524
Dibulatkan ………………. ………….. = Rp. 39,520

2 1 m2 Plesteran tebal 15 mm camp. 1PC:3psr untuk list. (An. SNI)


0.162 Zak PC @ Rp. 52,000 = Rp. 8,424
0.019 m3 Pasir pasang @ Rp. 200,000 = Rp. 3,800
0.015 Kepala Tukang @ Rp. 95,000 = Rp. 1,425
0.150 Tukang Batu @ Rp. 95,000 = Rp. 14,250
0.200 Pekerja @ Rp. 85,000 = Rp. 17,000
0.010 Mandor @ Rp. 100,000 = Rp. 1,000
Sub Total ………………. ………….. = Rp. 45,899
Dibulatkan ………………. ………….. = Rp. 45,890
3 1 m2 Plesteran tebal 15 mm camp. 1PC:4psr untuk list. (An. SNI)
0.128 Zak PC @ Rp. 52,000 = Rp. 6,656
0.020 m3 Pasir pasang @ Rp. 200,000 = Rp. 4,000
0.015 Kepala Tukang @ Rp. 95,000 = Rp. 1,425
0.150 Tukang Batu @ Rp. 95,000 = Rp. 14,250
0.200 Pekerja @ Rp. 85,000 = Rp. 17,000
0.010 Mandor @ Rp. 100,000 = Rp. 1,000
Sub Total ………………. ………….. = Rp. 44,331
Dibulatkan ………………. ………….. = Rp. 44,330

4 1 m2 Plesteran tebal 15 mm camp. 1PC:2Psr untuk list. (An. SNI)


0.213 Zak PC @ Rp. 52,000 = Rp. 11,076
0.017 m3 Pasir pasang @ Rp. 200,000 = Rp. 3,400
0.015 Kepala Tukang @ Rp. 95,000 = Rp. 1,425
0.150 Tukang Batu @ Rp. 95,000 = Rp. 14,250
0.200 Pekerja @ Rp. 85,000 = Rp. 17,000
0.010 Mandor @ Rp. 100,000 = Rp. 1,000
Sub Total ………………. ………….. = Rp. 48,151
Dibulatkan ………………. ………….. = Rp. 48,150

5 1 m2 Plesteran camp. 1 PC:3Kpr:8Psr (An. SNI)


0.046 Zak PC @ Rp. 52,000 = Rp. 2,392
0.006 m3 Kapur @ Rp. 228,800 = Rp. 1,373
0.014 m3 Pasir pasang @ Rp. 200,000 = Rp. 2,800
0.015 Kepala Tukang @ Rp. 95,000 = Rp. 1,425
0.150 Tukang Batu @ Rp. 95,000 = Rp. 14,250
0.200 Pekerja @ Rp. 85,000 = Rp. 17,000
0.010 Mandor @ Rp. 100,000 = Rp. 1,000
Sub Total ………………. ………….. = Rp. 40,240
Dibulatkan ………………. ………….. = Rp. 40,230

6 1 m1 Benangan dan kol-kolan


0.0026 Zak PC @ Rp. 52,000 = Rp. 135
0.009 m3 Pasir pasang @ Rp. 200,000 = Rp. 1,800
0.120 Tukang Batu @ Rp. 95,000 = Rp. 11,400
Sub Total ………………. ………….. = Rp. 13,335
Dibulatkan ………………. ………….. = Rp. 13,330

V PEKERJAAN LANTAI
1 1 m2 Pasang dinding keramik 20/25 (An. SNI)
1.000 m2 Tegel keramik @ Rp. 50,000 = Rp. 50,000
0.286 Zak PC @ Rp. 52,000 = Rp. 14,872
0.042 m3 Pasir pasang @ Rp. 200,000 = Rp. 8,400
0.035 Kepala Tukang @ Rp. 95,000 = Rp. 3,325
0.350 Tukang Batu @ Rp. 95,000 = Rp. 33,250
0.620 Pekerja @ Rp. 85,000 = Rp. 52,700
0.030 Mandor @ Rp. 100,000 = Rp. 3,000
Sub Total ………………. ………….. = Rp. 165,547
Dibulatkan ………………. ………….. = Rp. 165,540
2 1 m2 Pasang tegel keramik 30x30 landasan patlah batu bata (An. SNI)
1.000 m2 Tegel keramik 30/30 @ Rp. 55,000 = Rp. 55,000
0.284 Zak PC @ Rp. 52,000 = Rp. 14,768
0.042 m3 Pasir pasang @ Rp. 200,000 = Rp. 8,400
0.035 Kepala Tukang @ Rp. 95,000 = Rp. 3,325
0.350 Tukang Batu @ Rp. 95,000 = Rp. 33,250
0.620 Pekerja @ Rp. 85,000 = Rp. 52,700
0.030 Mandor @ Rp. 100,000 = Rp. 3,000
Sub Total ………………. ………….. = Rp. 170,443
Dibulatkan ………………. ………….. = Rp. 170,440

14.000 bh Batu bata @ Rp. 1,000 = Rp. 14,000


0.008 Zak PC @ Rp. 52,000 = Rp. 416
0.016 m3 Kapur @ Rp. 228,800 = Rp. 3,661
0.022 Tukang Batu @ Rp. 95,000 = Rp. 2,090
0.350 Pekerja @ Rp. 85,000 = Rp. 29,750
0.003 Mandor @ Rp. 100,000 = Rp. 300
Sub Total II ………………. ………….. = Rp. 49,917
Total ………………. ………….. = Rp. 220,360
Dibulatkan ………………. ………….. = Rp. 220,350

3 1 m2 Pasang tegel keramik 30x30 landasan rabat beton 1:3:5 tebal 6 cm (An. SNI)
1.000 m2 Tegel keramik 30/30 @ Rp. 55,000 = Rp. 55,000
0.284 Zak PC @ Rp. 52,000 = Rp. 14,768
0.042 m3 Pasir pasang @ Rp. 200,000 = Rp. 8,400
0.035 Kepala Tukang @ Rp. 95,000 = Rp. 3,325
0.350 Tukang Batu @ Rp. 95,000 = Rp. 33,250
0.620 Pekerja @ Rp. 85,000 = Rp. 52,700
0.030 Mandor @ Rp. 100,000 = Rp. 3,000
Sub Total ………………. ………….. = Rp. 170,443
Dibulatkan ………………. ………….. = Rp. 170,440
VI PEKERJAAN PENGECATAN
1 1 m2 Mengecat kayu baru serta menggosok dan mendempul (An. SNI)
0.430 kg Cat @ Rp. 80,000 = Rp. 34,400
0.200 kg Meni @ Rp. 22,800 = Rp. 4,560
0.150 kg Dempul @ Rp. 26,300 = Rp. 3,945
0.500 lbr Kertas gosok @ Rp. 2,500 = Rp. 1,250
0.060 Kepala Tukang @ Rp. 95,000 = Rp. 5,700
0.009 Tukang @ Rp. 95,000 = Rp. 855
0.070 Pekerja @ Rp. 85,000 = Rp. 5,950
0.0025 Mandor @ Rp. 100,000 = Rp. 250
Sub Total ………………. ………….. = Rp. 56,910
Dibulatkan ………………. ………….. = Rp. 56,910

2 1 m2 Mengecat tembok / plafond (An. SNI)


1.000 kg Plamir @ Rp. 9,800 = Rp. 9,800
0.360 kg Cat dinding Decolit @ Rp. 60,000 = Rp. 21,600
0.500 lbr Kertas gosok @ Rp. 2,500 = Rp. 1,250
0.0063 Kepala Tukang @ Rp. 95,000 = Rp. 599
0.065 Tukang @ Rp. 95,000 = Rp. 6,175
0.020 Pekerja @ Rp. 85,000 = Rp. 1,700
0.002 Mandor @ Rp. 100,000 = Rp. 200
Sub Total ………………. ………….. = Rp. 41,324
Dibulatkan ………………. ………….. = Rp. 41,320
3 1 m2 Mengecat tembok / plafond pernah dicat (An. SNI)
0.180 kg Cat dinding Decolit @ Rp. 55,000 = Rp. 9,900
0.006 Kepala Tukang @ Rp. 95,000 = Rp. 570
0.065 Tukang @ Rp. 95,000 = Rp. 6,175
0.020 Pekerja @ Rp. 85,000 = Rp. 1,700
0.002 Mandor @ Rp. 100,000 = Rp. 200
Sub Total ………………. ………….. = Rp. 18,545
Dibulatkan ………………. ………….. = Rp. 18,540

4 1 m2 Pekerjaan plitur (An. SNI)


0.3220 kg Cherlak @ Rp. 55,000 = Rp. 17,710
0.330 ltr Spiritus @ Rp. 9,000 = Rp. 2,970
2.000 lbr Kertas Gosok @ Rp. 2,500 = Rp. 5,000
0.065 Tukang plitur @ Rp. 95,000 = Rp. 6,175
Sub Total ………………. ………….. = Rp. 31,855
Dibulatkan ………………. ………….. = Rp. 31,850

set Pemipaan Air Bersih


- Pipa PVC AW
28.00 m dia. 3/4" = Rp. 9,000.00 = Rp. 252,000
1.00 lot - Fitting = Rp. 55,000.00 = Rp. 55,000
2.00 bh - Lem = Rp. 10,000.00 = Rp. 20,000
1.00 bh Gate Valve dia. 1" = Rp. 72,000.00 = Rp. 72,000
Sub Total ………………. ………….. = Rp. 399,000
Dibulatkan ………………. ………….. = Rp. 399,000

set Pemipaan Air Kotor


- Pipa PVC AW
30.00 m dia. 1" = Rp. 11,000.00 = Rp. 330,000
1.00 lot - Fitting = Rp. 60,000.00 = Rp. 60,000
2.00 bh - Lem = Rp. 10,000.00 = Rp. 20,000
Sub Total ………………. ………….. = Rp. 410,000
Dibulatkan ………………. ………….. = Rp. 410,000

Pemipaan Air Hujan


- Pipa PVC AW
20.00 m dia. 1.5" = Rp. 12,000.00 = Rp. 240,000
1.00 tot - Fitting = Rp. 60,000.00 = Rp. 60,000
2 bh - Lem = Rp. 10,000.00 = Rp. 20,000
- Roof Drain (RD) -
2.00 bh dia. 3" = Rp. 55,000.00 = Rp. 110,000
Sub Total ………………. ………….. = Rp. 430,000
Dibulatkan ………………. ………….. = Rp. 430,000
I. DAFTAR HARGA BAHAN

HARGA
No. JENIS BAHAN SATUAN TERENDAH TERTINGGI
Rp. Rp.
1 2 3 4
I JENIS BAHAN PENUTUP ATAP DAN PLAFOND
1 Asbes datar tebal 4 mm M2 7,000 7,500
2 Asbes gelombang besar tebal 5 mm (2.03 x 1.05) LBR 82,500 85,000
3 Asbes gelombang kecil tebal 4 mm (3.05 x 1.05) LBR 60,500 63,000
4 Asbes wuwung gelombang besar tebal 5 mm LBR 35,000 37,000
5 Asbes wuwung gelombang kecil tebal 4 mm LBR 17,500 18,500
6 Asbes plat Gresik M2 8,500 9,000
7 Asbes Plat Karangpilang M2 8,000 8,500
8 Gypsum tebal 9 mm M2 70,000 80,000
9 Gypsum tebal 12 mm M2 90,000 95,000
10 Fiber glas lebar 92 cm M2 38,000 41,000
11 Atap Polli Carbonat M2 95,000 105,000
12 Genteng flam press jawa / lokal BJ 2,250 2,500
13 Genteng galvarium BJ 5,000 5,200
14 Eternit Gresik M2 14,000 15,000
15 Genteng kaca BJ 4,500 5,000
16 Genteng Karangpilang BJ 1,500 1,500
17 Genteng wuwung galvarium BJ 7,500 8,000
18 Genteng wuwung jawa / lokal BJ 3,000 3,000
19 Genteng wuwung Karanpilang / wisma BJ 3,000 4,000
20 Genteng Kodok Ex. Bambe BJ 1,250 1,300
21 Genteng Kodok Ex. Wisma BJ 1,300 1,400
22 Seng Datar BJLS 30 (0,9x1,00) M2 25,000 27,500
23 Seng Datar BJLS lebar (0.9 x 1.00) M3 17,500 20,000
24 Seng Gelombang BKLS 30 Ukuran 1.8 x 0.9 LBR 50,000 54,000
26 Seng Gelombang BJLS 30 (0.8 x 3.00) LBR 83,000 85,000
27 Seng Gelombang BJLS 30 (0.8 x 1.50) LBR 45,000 48,000
28 Seng Gelombang BJLS 30 (0.45 x 1.00) LBR 12,500 15,000
29 Teakwood 122x244x4 mm LBR 71,000 72,500
30 Teakwood 110x210x4 mm LBR 44,000 46,000
31 Triplek 3 mm 1.2 x2.40 m1 LBR 55,000 57,500
32 Triplek 3 mm 0.9 x2 m1 LBR 45,000 47,500
33 Triplek 122x244x4 LBR 35,000 37,500
34 Triplek 110x210x4 mm LBR 32,500 35,000
35 Triplek 9 mm LBR 130,000 135,000
36 Sirap asbes 4 mm LBR
37 List Eternit M1 4,500 5,000

II BAHAN MENGGUNAKAN KAYU


1 Kayu gelam diameter 10-12 cm, 4 m MT 125,000 135,000
2 Kayu jati balok 8/12, 6/12 M3 11,625,000 16,875,000
3 Kayu jati usuk 5/7, 4/6, 6/12 M3 10,712,000 14,640,000
4 Kayu jati papan 2/20 x 2 m M3 11,902,000 15,870,000
5 Kayu jati reng 2/3, 3/5 M3 10,712,000 14,640,000
6 Dolken jati dia. 15 cm - 4m BT 200,000 210,000
7 Kayu kamper (balok) M3 5,250,000 7,000,000
8 Kayu kamper (papan) M3 5,500,000 7,500,000
9 Kayu kamper (usuk) M3 5,260,000 7,000,000
10 Kayu kamper (reng) M3 5,000,000 5,250,000
11 Kayu meranti (balok) M3 2,879,000 3,700,000
12 Kayu meranti (papan) M3 2,879,000 3,700,000
13 Kayu meranti (usuk) M3 5,250,000 7,000,000
14 Kayu meranti (begesting) M3 3,089,000 3,500,000
15 Kayu bengkirai balok 8/12 M3 3,950,000 5,250,000
16 Kayu bengkirai papan 3/20-4m @ Rp. 85.000,00 M3 3,500,000 3,650,000
17 Kayu bengkirai usuk 5/7-4m M3 3,800,000 3,850,000
18 Kayu bakar M3 65,000 70,000
19 Bambu bongkotan 10-12 cm panjang 3.00 mt M3 15,000 15,000
20 Bambu Ori 10-12 cm panjang 3.00 mt M3 10,000 10,000
1 2 3 4
21 Gedeg Guling M3 2,000 2,500
26 Kayu / papan bekisting m³ Rp 2,000,000

III BAHAN MENGGUNAKAN BATU/PASIR & SEMEN


2 Batu bata merah kelas 1 BH 1,000 1,200
3 Batu putih lokal M3 60,000 66,000
4 Batu kali pecah 15/20 M3 150,000 250,000
5 Batu gunung pecah 15/20 M3 150,000 250,000
6 Batu ampyang KG
7 Batu belah 6/10 cm M3 98,200 131,200
8 Batu bobos uk 10x20x15 cm BJ
9 Batu gilang M3
10 Batu gilang (batu tempel) M3
11 Batu gilang jember M3
12 Batu kambang KG
13 Batu/cor koral pecah 2/3 M3 200,000 250,000
14 Batu/cor koral pecah 1-2 M3 ;;; 250,000
15 Batu/cor koral pecah 1/2-1 M3 175,000 200,000
16 Batu/cor koral pecah 5/7 M3 160,000 180,000
17 Batu/cor koral pecah 0,5-1 M3 175,000 200,000
18 Batu/cor koral pecah 3/5 - 4/6 M3 150,000 160,000
19 Batu kerikil beton M3 68,600 75,000
20 Pasir beton M3 250,000 250,000
21 Pasir pasang M3 200,000 210,000
22 Pasir sirtu M3 85,000 86,500
23 Pasir lokal M3 125,000 150,000
24 Pasir cor M3 250,000 250,000
27 Glass Block BJ 25,000 30,000
28 Semen berwarna yiyitan KG 9,500 10,000
29 Semen merah M3 52,500 55,000
30 Semen PC (Portland Cement) / Semen Gresik 50 kg ZAK 60,000 65,000
31 Semen PC (Portland Cement) / Semen Gresik 40 kg ZAK 50,000 52,000
32 Semen Tiga Roda ZAK 55,000 57,500
33 Semen Putih KG 2,000 2,500
34 Sirtu Royalti M3 52,000 87,000
35 Kerikil tak tersaring M3 49,000 84,000
36 Kerikil disaring M3 68,600 103,600
37 Kerikil sungai - royalti M3 59,600 94,600
38 Kapur pasang M3 228,800 230,500
39 Kapur gamping KG 355 360

IV BAHAN MENGGUNAKAN BESI/LOGAM


1 Besi begel/ baut KG 9,000 10,000
2 Besi beton polos KG 11,000 12,500
4 Besi beton diameter 16 mm Ljr 145,000 150,000
5 Besi beton diameter 12 mm Ljr 85,000 90,000
6 Besi beton diameter 10 mm Ljr 60,000 65,000
7 Besi beton diameter 8 mm Ljr 45,000 50,000
8 Besi beton diameter 6 mm Ljr 24,000 26,000
9 Besi beton diameter 5 mm Ljr 23,000 25,000
18 Mur Baut KG 18,000 20,000
32 Kawat Beton KG 18,000 20,000
33 Kawat Beton ulir KG 18,000 20,000
34 Kawat Baja (bendrat) KG 18,000 20,000
35 Kawat Baja (bendrat) KG 18,000 20,000
39 Kawat nyamuk kasa aluminium M2 18,000 19,000

V BAHAN UNTUK LANTAI


1 Tegel abu-abu 20 x 20 cm BH 2,000 2,500
2 Tegel keramik 25 x 25 BH 3,750 4,000
3 Tegel keramik 30 x 30 M2 55,000 60,000
9 Tegel keramik 40 x 50 (dinding) BH 15,500 16,000
11 Tegel keramik 20 x 25 (dinding) BH 50,000 55,000
1 2 3 4

VI BAHAN UNTUK PENGECATAN


1 Cat besi EMCO KG 60,000 80,000
2 Cat kayu EMCO KG 60,000 80,000
3 Cat mini (besi/kayu) cap Pedang KG 22,800 23,000
4 Cat tembok interior KG 50,000 55,000
5 Cat tembok eksterior KG 55,000 60,000
6 Cat Bron KG 24,000 26,400
7 Cerlak KG 55,000 57,000
8 Dempul KG 26,300 27,000
9 Blass Bit KG 17,000 18,000
10 Minyak Cat /Efduner LT 14,100 15,000
11 Teer KG 2,500 3,000
12 Kertas gosok LBR 2,500 3,000
13 Plamur tembok KG 9,800 10,500
14 Plamur kayu KG 14,700 15,500
16 Spiritus LT 9,000 10,000
17 Lem KG 29,500 30,000
18 Kuas BH 7,500 10,000
19 Thiner LT 7,500 7,700
20 Thiner A LT 15,000 15,000
21 Thiner B / minyak cat LT 10,000 10,500

VII BAHAN PENGGANTUNG DAN PENGUNCI


1 Engsel H STL 6,000 7,500
2 Engsel Kuningan arch asli STL 45,000 60,000
4 Grendel BJ 6,000 6,500
5 Grendel biasa (besar) BH 4,000 5,000
6 Kunci gembok sedang BH 9,000 12,000
7 Kunsi tanam (808) BJ 83,000 110,000
8 Kunci tanam besar Kuda Terbang 2 x putar BJ 100,000 110,000
9 Hak angin BJ 5,500 6,000
10 Hak angin 4 mm (lurus) BJ 2,500 3,000
11 Hak angin (sikutan) STL 5,000 5,500
12 Hak angin lurus (bisa disetel maju/mundur) STL 6,000 7,000
13 Grendel Jendela STL 25,000 40,000
14 Engsel Jendela STL 25,000 40,000

IX BAHAN JENIS KACA


1 Kaca polos tb. 5 mm M2 131,100 132,000
2 Kaca rayban tb. 5 mm M2 150,000 150,000
3 Krepyak kaca nako + kerangka LBR 19,900 21,000

XI BAHAN PLASTIK PIPA PVC


1 Keni PVC 2" BH 5,000 5,500
2 Klem PVC BH 4,200 4,700
3 Pipa paralon 5/8" LJR 5,000 5,500
4 Pipa PVC 1/2" panjang 4.00 mt (Maspion) M1 4,000 4,500
5 Pipa PVC 2" panjang 4.00 mt (Maspion) M1 16,500 17,500
6 Pipa PVC 3" panjang 4.00 mt (Maspion) M1 22,000 25,000
7 Pipa PVC 3/4" panjang 4.00 mt (Maspion) M1 4,750 5,750
8 Pipa PVC 4" panjang 4.00 mt (Maspion) M1 47,500 48,600
9 Pipa PVC 1" AW ex Maspion M1 7,000 8,000
10 Pupa PVC 11/2" AW ex Maspion M1 19,000 21,000

XII BAHAN JENIS PAKU


1 Paku asbes BH 500 550
2 Paku reng KG 16,000 16,000
3 Paku seng payung KG 30,000 35,000
4 Paku skrup DOS 17,500 20,000
6 Paku triplek KG 18,000 18,000
1 2 3 4
7 Paku usuk KG 24,500 14,000
8 Skrup BJ 800 850
9 Mur Baut BJ 1,930 2,100

XIII BAHAN PERALATAN LISTRIK


3 Fitting plafond SET 2,500 3,000
4 T doos PVC SET 3,500 4,000
5 Isolator BH 250 300
6 Stop kontak (Broco) BH 22,500 23,000
7 Sakelar (Broco) BH 20,000 21,000
8 Skakelar / hendel BH 65,000 70,000
9 Zekering lengkap BH 75,000 80,000
10 Zekering SPA 60 Amp. BH 550,000 600,000
11 Las doof BH 200 300
12 Panel box BH 500,000 550,000
14 Sekering MCB thermis 10 - 16 Amp. BH 200,000 250,000
15 Sekering MCB thermis 10 Amp. BH 150,000 200,000
16 Stater lampu TL BH 1,500 2,000
17 Lampu Spot BH 150,000 200,000
18 Lampu Pijar 25, 40, 75 / 220 V BH 3,500 4,000
19 Lampu TL 20 W / 220 V komplit balas, kaca (Philips) BH 50,000 55,000
20 Lampu TL 40 W / 220 V komplit balas, kaca (Philips) BH 65,000 70,000

XV BAHAN JENIS KABEL


1
1 Kabel NYA 500 Volt 1 x 2.5 mm2 M 12,000
2 Kabel NYA 1000 Volt 1 x 1.5 mm2 M1 7,500
3 Kabel NYA 1000 Volt 1 x 2.5 mm2 M1 15,000
4 Kabel NYA 1000 Volt 1 x 2 mm2 M1 12,000
5 Kabel NYFGBY 4 x 10 mm M1 24,000
1
6 Kabel NYFGBY 4 x 16 mm M 36,000
7 Kabel NYFGBY 4 x 4 mm M1 11,500
8 Kabel NYFGBY 4 x 6 mm M1 8,500
9 Kabel NYFGBY/NYFGBY 4 x 2 mm M1 11,500
II. DAFTAR UPAH

NO TENAGA KERJA (HARI) SATUAN Kab. Ponorogo


1 2 3 4
1 MANDOR ORG 100,000
2 KEPALA TK. GALI TANAH ORG 95,000
3 KEPALA TK. BATU ORG 95,000
4 KEPALA TK. KAYU ORG 95,000
5 KEPALA TK. BESI ORG 95,000
6 KEPALA TK. CAT' ORG 95,000
7 KEPALA TK. LISTRIK ORG 95,000
8 KEPALA TK. PIPA ORG 95,000
9 TUKANG GALI TANAH ORG 95,000
10 TUKANG BATU ORG 95,000
11 TUKANG KAYU ORG 95,000
12 TUKANG BESI ORG 95,000
13 TUKANG CAT ORG 95,000
14 TUKANG PLITUR ORG 95,000
15 TUKANG ASPAL ORG 95,000
16 TUKANG PIPA ORG 95,000
17 TUKANG LISTRIK ORG 95,000
18 PEMBANTU TK. BATU ORG 85,000
19 PEMBANTU TK. KAYU ORG 85,000
20 PEMBANTU TK. BESI ORG 85,000
21 PEMBANTU TK. CAT ORG 85,000
22 PEMBANTU TK. LISTRIK ORG 85,000
23 PEMBANTU TK. PIPA ORG 85,000
24 MASINIS ORG 95,000
25 PEMBANTU MASINIS ORG 85,000
26 MEKANIK ORG 85,000
27 PEMBANTU MEKANIK ORG 85,000
28 OPERATOR ORG 95,000
29 PENGEMUDI/SOPIR ORG 85,000
30 TUKANG TANAM ORG 85,000
31 PENJAGA API ORG 85,000
32 PENJAGA MALAM ORG 85,000
33 SOPIR MATERIAL / TRUCK ORG 85,000
34 TUKANG KEPALA HR 85,000
35 TUKANG HR 85,000
36 OPERATOR (FINISHER / BULDOZER) HR 85,000
37 OPERATOR SEMI TERLATIH HR 85,000
38 PEMBANTU OPERATOR HR 85,000
39 PEMBANTU SOPIR / KENEK HR 85,000
40 BURUH LAPANGAN TAK TERLATIH HR 85,000
41 BURUH LAPANGAN AGAK TERLATIH HR 85,000
42 BURUH LAPANGAN TERLATIH HR 85,000
43 PEKERJA JAM 12,000
44 TUKANG JAM 13,500
45 MANDOR JAM 13,500
46 PEKERJA HOK 85,000
47 TUKANG HOK 95,000
48 MANDOR HOK 95,000