Uraian Pekerjaan Satuan VOLUME Volume x 10 % HARGA SATUAN

Pasir Urug M3 8.52544 10 230,000


Batu Kali M3 74.20776 82 230,000
Semen PC Kg 16182.16133485 17801 1,500
Pasir Pasang M3 31.41574 35 250,000
Kayu Sembarang M3 1.6552000008 2 2,500,000
Paku biasa Kg 11.0346666722 13 25,000
Besi beton polos Batang 0 0 125,000
Kawat beton Kg 56.2406666805 62 28,500
Pasir beton M3 4.9656000025 6 255,000
Kerikil pecah M3 8.2760000041 10 400,000
Besi 14 Batang 103.2333333333 114 165,000
Besi 12 Batang 134.3333333333 148 125,000
Besi 8 Batang 8.6388888889 10 50,000
Besi 16 Batang 7.6 9 235,000
Besi 10 Batang 24 27 84,000
Besi 6 Batang 28 31 30,500
Pipa Galvanis Ø 2" Batang 7.59924 9 205,000
Besi 12 Kg 134.3333333333 148 125,000
Pekerja HOK 278.2317780809 307 85,000
Tukang HOK 59.62705996 66 100,000
Mandor HOK 11.003966668 13 100,000
Tukang batu HOK 18.2072000091 21 100,000
Tukang kayu HOK 18.2072000091 21 100,000
Tukang besi HOK 18.2072000091 21 100,000
Kepala tukang HOK 5.5173333361 7 100,000
TOTAL HARGA
2,300,000 1,960,851
18,860,000 17,067,785
26,701,500 24,273,242
8,750,000 7,853,935
5,000,000 4,138,000
325,000 275,867
- -
1,767,000 1,602,859
1,530,000 1,266,228
4,000,000 3,310,400
18,810,000 17,033,500
18,500,000 16,791,667
500,000 431,944
2,115,000 1,786,000
2,268,000 2,016,000
945,500 854,000
1,845,000 1,557,844
18,500,000 16,791,667
26,095,000 23,649,701
6,600,000 5,962,706
1,300,000 1,100,397
2,100,000 1,820,720
2,100,000 1,820,720
2,100,000 1,820,720
700,000 551,733

173,712,000 155,738,486
ANALISA BIAYA KONSTRUKSI
PEKERJAAN PERSIAPAN

PA 6.4 Pengukuran dan Pemasangan bouplank

6.4.1. Bahan
- Kayu 5/7 0.012 M3 x Rp 87,780 = Rp 1,053.36
- Paku biasa 0.020 Kg x Rp 25,000 = Rp 500.00
- Kayu papan 0.007 M3 x Rp 55,000 = Rp 385.00
Juml = Rp 1,938.36

6.4.2. Tenaga
- Tukang kayu 0.100 Oh x Rp 100,000 = Rp 10,000.00
- Pekerja 0.100 Oh x Rp 85,000 = Rp 8,500.00
- Kepala tukang 0.010 Oh x Rp 100,000 = Rp 1,000.00
- Mandor 0.005 Oh x Rp 100,000 = Rp 500.00
PA 6.8 1 m² Membersihkan lapangan dan perataan

6.8.1 Tenaga
- Pekerja 0.100 Oh x Rp 85,000 = Rp 8,500.00
- Mandor 0.050 Oh x Rp 100,000 = Rp 5,000.00
Jum = Rp 13,500.00
ANALISA BIAYA KONSTRUKSI
PEKERJAAN TANAH

PT 6.1. 1 m³ Galian tanah biasa sedalam 1 meter

6.1.1. Tenaga
- Pekerja 0.400 Oh x Rp. 85,000 = Rp. 34,000.00
- Mandor 0.040 Oh x Rp. 100,000 = Rp. 4,000.00
Jumlah (1) = Rp. 38,000.00

PT 6.2. 1 m³ Galian tanah biasa sedalam 2 meter

6.2.1. Tenaga
- Pekerja 0.526 Oh x Rp. 85,000 = Rp. 44,710.00
- Mandor 0.0526 Oh x Rp. 100,000 = Rp. 5,260.00
Jumlah (1) = Rp. 49,970.00

PT 6.3. 1 m³ Galian tanah biasa sedalam 3 meter

6.3.1. Tenaga
- Pekerja 0.735 Oh x Rp. 85,000 = Rp. 62,475.00
- Mandor 0.0735 Oh x Rp. 100,000 = Rp. 7,350.00
Jumlah (1) = Rp. 69,825.00
ANALISA BIAYA KONSTRUKSI
PEKERJAAN PONDASI
PP 6.4. 1 M³ Pasang pondasi batu kali, 1 Pc : 3 Ps

6.4.1. Bahan
- Batu belah 1.100 M³ x Rp. 230,000 = Rp. 253,000.00
- Semen PC 202.000 Kg x Rp. 1,500 = Rp. 303,000.00
- Pasir Pasang 0.485 M³ x Rp. 250,000 = Rp. 121,250.00
Juml = Rp. 677,250.00

6.4.2. Tenaga
- Pekerja 1.500 Oh x Rp. 85,000 = Rp. 127,500.00
- Tukang batu 0.600 Oh x Rp. 100,000 = Rp. 60,000.00
- Kepala tukang 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
- Mandor 0.075 Oh x Rp. 100,000 = Rp. 7,500.00
Juml = Rp. 201,000.00
Juml = Rp. 878,250.00
PP 6.5. 1 M³ Pasang pondasi batu kali, 1 Pc : 4 Ps.

6.5.1. Bahan
- Batu belah 1.100 M³ x Rp. 230,000 = Rp. 253,000.00
- Semen PC 163.000 Kg x Rp. 1,500 = Rp. 244,500.00
- Pasir Pasang 0.520 M³ x Rp. 250,000 = Rp. 130,000.00
Juml = Rp. 627,500.00

6.5.2. Tenaga
- Pekerja 1.500 Oh x Rp. 85,000 = Rp. 127,500.00
- Tukang batu 0.600 Oh x Rp. 100,000 = Rp. 60,000.00
- Kepala tukang 0.060 Oh x Rp. 100,000 = Rp. 6,000.00
- Mandor 0.075 Oh x Rp. 100,000 = Rp. 7,500.00
Juml = Rp. 201,000.00
Juml = Rp. 828,500.00
ANALISA BIAYA KONSTRUKSI
PEKERJAAN PLESTERAN

PPL 6.14. 1 M² Plesteran 1 Pc : 3 Ps, tebal 20 mm

6.14.1. Bahan
- Semen PC 10.800 Kg x Rp. 1,500 = Rp. 16,200.00
- Pasir pasang 0.026 M³ x Rp. 250,000 = Rp. 6,500.00
= Rp. 22,700.00
6.14.2. Tenaga
- Pekerja 0.250 Oh x Rp. 85,000 = Rp. 21,250.00
- Tukang batu 0.200 Oh x Rp. 100,000 = Rp. 20,000.00
- Kepala tukang 0.020 Oh x Rp. 100,000 = Rp. 2,000.00
- Mandor 0.0125 Oh x Rp. 100,000 = Rp. 1,250.00
Jumlah (2) = Rp. 44,500.00
Jumlah (1) + (2) = Rp. 67,200.00
ANALISA BIAYA KONSTRUKSI
PEKERJAAN BETON

PB 6.5. 1 M³ Membuat beton 1 Pc : 2 Ps : 3 Kr

6.5.1. Bahan
- Semen PC 232.000 Kg x Rp. 1,500 = Rp. 348,000.00
- Pasir beton 0.520 M³ x Rp. 255,000 = Rp. 132,600.00
- Batu pecah 1 - 2 cm 0.780 M³ x Rp. 260,000 = Rp. 202,800.00
= Rp. 683,400.00
6.5.2. Tenaga
- Pekerja 1.650 Oh x Rp. 85,000 = Rp. 140,250.00
- Tukang batu 0.250 Oh x Rp. 100,000 = Rp. 25,000.00
- Kepala tukang 0.025 Oh x Rp. 100,000 = Rp. 2,500.00
- Mandor 0.080 Oh x Rp. 100,000 = Rp. 8,000.00
= Rp. 175,750.00
= Rp. 859,150.00

PB 6.29. 1 M² Pasang bekisting untuk sloof

6.29.1. Bahan
- Kayu sembarang 0.045 M³ x Rp. 2,500,000 = Rp. 112,500.00
- Paku biasa 0.300 Kg x Rp. 25,000 = Rp. 7,500.00
- Minyak bekisting 0.100 Lt x Rp. 6,290 = Rp. 629.00
= Rp. 120,629.00

6.29.2. Tenaga
- Pekerja 0.300 Oh x Rp. 85,000 = Rp. 25,500.00
- Tukang batu 0.260 Oh x Rp. 100,000 = Rp. 26,000.00
- Kepala tukang 0.026 Oh x Rp. 100,000 = Rp. 2,600.00
- Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
= Rp. 54,600.00
= Rp. 175,229.00
PB 6.30. 1 M² Pasang bekisting untuk kolom

6.30.1. Bahan
- Kayu sembarang 0.040 M³ x Rp. 2,500,000 = Rp. 100,000.00
- Paku biasa 0.400 Kg x Rp. 25,000 = Rp. 10,000.00
- Minyak bekisting 0.200 Lt x Rp. 6,290 = Rp. 1,258.00
- Balok kayu sembarang 0.015 M³ x Rp. 2,500,000 = Rp. 37,500.00
- Plywood tebal 0.350 Lbr x Rp. 90,000 = Rp. 31,500.00
- Bambu 2.000 Btg x Rp. 10,000 = Rp. 20,000.00
= Rp. 200,258.00

6.30.2. Tenaga
- Pekerja 0.300 Oh x Rp. 85,000 = Rp. 25,500.00
- Tukang batu 0.330 Oh x Rp. 100,000 = Rp. 33,000.00
- Kepala tukang 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
- Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
= Rp. 62,400.00
= Rp. 262,658.00

PB 6.31. 1 M² Pasang bekisting untuk balok

6.31.1. Bahan
- Kayu sembarang 0.040 M³ x Rp. 2,500,000 = Rp. 100,000.00
- Paku biasa 0.400 Kg x Rp. 25,000 = Rp. 10,000.00
- Minyak bekisting 0.200 Lt x Rp. 6,290 = Rp. 1,258.00
- Balok kayu sembarang 0.018 M³ x Rp. 2,500,000 = Rp. 45,000.00
- Plywood tebal 0.350 Lbr x Rp. 90,000 = Rp. 31,500.00
- Bambu 2.000 Btg x Rp. 10,000 = Rp. 20,000.00
= Rp. 207,758.00

6.31.2. Tenaga
- Pekerja 0.320 Oh x Rp. 85,000 = Rp. 27,200.00
- Tukang batu 0.330 Oh x Rp. 100,000 = Rp. 33,000.00
- Kepala tukang 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
- Mandor 0.006 Oh x Rp. 100,000 = Rp. 600.00
= Rp. 64,100.00
= Rp. 271,858.00

PB 6.46. 1 M' Membuat ring balok beton bertulang (10 x 15) cm

6.46.1. Bahan
- Kayu Sembarang 0.003 M³ x Rp. 2,500,000 = Rp. 7,500.00
- Paku biasa 0.020 Kg x Rp. 25,000 = Rp. 500.00
- Besi beton polos 3.600 Kg x Rp. 125,000 = Rp. 450,000.00
- Kawat beton 0.050 Kg x Rp. 28,500 = Rp. 1,425.00
- Semen PC 5.500 Kg x Rp. 1,500 = Rp. 8,250.00
- Pasir beton 0.009 M³ x Rp. 255,000 = Rp. 2,295.00
- Kerikil pecah 0.015 M³ x Rp. 400,000 = Rp. 6,000.00
= Rp. 475,970.00

6.46.2. Tenaga
- Pekerja 0.100 Oh x Rp. 85,000 = Rp. 8,500.00
- Tukang batu 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
- Tukang kayu 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
- Tukang besi 0.033 Oh x Rp. 100,000 = Rp. 3,300.00
- Kepala tukang 0.010 Oh x Rp. 100,000 = Rp. 1,000.00
- Mandor 0.005 Oh x Rp. 100,000 = Rp. 500.00
= Rp. 19,900.00
= Rp. 495,870.00

PB 6.46. 1 M3 Membuat ring balok beton bertulang

6.46.1. Bahan
- Kayu Sembarang 0.2 M³ x Rp. 2,500,000 = Rp. 7,500.00
- Paku biasa 1.33333 Kg x Rp. 25,000 = Rp. 500.00
- Besi beton polos 240 Kg x Rp. 125,000 = Rp. 450,000.00
- Kawat beton 3.33333 Kg x Rp. 28,500 = Rp. 1,425.00
- Semen PC 366.667 Kg x Rp. 1,500 = Rp. 8,250.00
- Pasir beton 0.6 M³ x Rp. 255,000 = Rp. 2,295.00
- Kerikil pecah 1 M³ x Rp. 400,000 = Rp. 6,000.00
= Rp. 475,970.00

6.46.2. Tenaga
- Pekerja 6.66667 Oh x Rp. 85,000 = Rp. 8,500.00
- Tukang batu 2.2 Oh x Rp. 100,000 = Rp. 3,300.00
- Tukang kayu 2.2 Oh x Rp. 100,000 = Rp. 3,300.00
- Tukang besi 2.2 Oh x Rp. 100,000 = Rp. 3,300.00
- Kepala tukang 0.66667 Oh x Rp. 100,000 = Rp. 1,000.00
- Mandor 0.33333 Oh x Rp. 100,000 = Rp. 500.00
= Rp. 19,900.00
= Rp. 495,870.00
PB 6.46. 1 M' Membuat ring balok beton bertulang (30 x 40) cm

6.46.1. Bahan
- Kayu Sembarang 0.009 M³ x Rp. 2,500,000 = Rp. 22,500.00
- Paku biasa 0.060 Kg x Rp. 25,000 = Rp. 1,500.00
- Besi beton polos 10.800 Kg x Rp. 125,000 = Rp. 1,350,000.00
- Kawat beton 0.150 Kg x Rp. 28,500 = Rp. 4,275.00
- Semen PC 16.500 Kg x Rp. 1,500 = Rp. 24,750.00
- Pasir beton 0.027 M³ x Rp. 255,000 = Rp. 6,885.00
- Kerikil pecah 0.045 M³ x Rp. 400,000 = Rp. 18,000.00
= Rp. 1,427,910.00

6.46.2. Tenaga
- Pekerja 0.300 Oh x Rp. 85,000 = Rp. 25,500.00
- Tukang batu 0.099 Oh x Rp. 100,000 = Rp. 9,900.00
- Tukang kayu 0.099 Oh x Rp. 100,000 = Rp. 9,900.00
- Tukang besi 0.099 Oh x Rp. 100,000 = Rp. 9,900.00
- Kepala tukang 0.030 Oh x Rp. 100,000 = Rp. 3,000.00
- Mandor 0.015 Oh x Rp. 100,000 = Rp. 1,500.00
= Rp. 59,700.00
= Rp. 1,487,610.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PEKERJAAN PEMBANGUNAN GEDUNG NEGARA
TAHUN ANGGARAN 2010

NO. URAIAN HARGA UPAH HARGA SATUAN

1### 3 4

1 Pekerja @Rp. 85,000.00 / Org/Hari


2 Mandor @Rp. 100,000.00 / OH
3 Tukang Batu @Rp. 100,000.00 / OH
4 Tukang Kayu @Rp. 100,000.00 / OH
5 Tukang @Rp. 100,000.00 / OH
6 Tukang Besi @Rp. 100,000.00 / OH
7 Tukang Keramik @Rp. 100,000.00 / OH
8 Tukang Plafond @Rp. 100,000.00 / OH
8 Tukang Pasang Pipa @Rp. 100,000.00 / OH
9 Tukang Cat @Rp. 100,000.00 / OH
10 Kepala Tukang @Rp. 100,000.00 / OH
11 Jaga Malam @Rp. 110,000.00 / OM

NO. URAIAN HARGA BAHAN HARGA SATUAN

1### 3 4

A TIMBUNAN / GALIAN
1 Tanah Timbun/Merah @Rp. 230,000.00 / M3
2 Pasir Timbun / Urug @Rp. 230,000.00 / M3
Pasir Urug @Rp. 230,000.00 / M3
3 Pasir Pasang @Rp. 250,000.00 / M3
4 Pasir beton @Rp. 255,000.00 / M3
5 Kerikil Pecah @Rp. 400,000.00 / M3
6 Sirtu @Rp. 230,000.00 / M3
7 Tanah Humus @Rp. 150,000.00 / M3

B BAHAN PEREKAT
1 Semen PC @Rp. 1,500.00 / Kg
2 Cement Putih @Rp. 2,500.00 / Kg
3 Lem Kayu @Rp. 37,400.00 / Kg
4 Lem Vinyl / Karet @Rp. 44,900.00 / Kg
5 Perekat Kaca @Rp. 76,500.00 / Kg
6 Waterfroof @Rp. 52,300.00 / Kg

C BATU / BATU CETAKAN


1 Batu Krikil / Koral 3 - 5 cm @Rp. 260,000.00 / M3
2 Batu Krikil / Koral 5 - 7 cm @Rp. 260,000.00 / M3
3 Batu Krikil / Koral 7 - 10 cm @Rp. 260,000.00 / M3
4 Batu Belah/Kali 10 - 15 cm @Rp. 260,000.00 / M3
5 Batu Belah/Kali 15 - 20 cm @Rp. 260,000.00 / M3
6 Batu Pecah 1 - 2 cm @Rp. 260,000.00 / M3
7 Batu Pecah 2 - 3 cm @Rp. 260,000.00 / M3
8 Batu Pecah 3 - 5 cm @Rp. 165,200.00 / M3
9 Batu Pecah 5 - 7 cm @Rp. 150,200.00 / M3
9 Batu Belah @Rp. 230,000.00 / M3
Batu kali @Rp. 230,000.00 / M3
10 Batu Kacang /jagung 0,5 - 1 cm @Rp. 202,700.00 / M3
11 Batu Splyt @Rp. 212,700.00 / M3
12 Batu Bata biasa 5x10x20 cm @Rp. 610.00 / Bh
13 Batu Bata Mesin 5x10x20 cm @Rp. 720.00 / Bh
14 Batu Bataco 6x12x24 cm @Rp. 4,180.00 / Bh
15 Batu Krawang 10x10x20 cm @Rp. 3,030.00 / Bh
16 Batu Krawang 10x15x15 cm @Rp. 3,470.00 / Bh
17 Batu Krawang 10x20x20 cm @Rp. 3,740.00 / Bh
18 Concrete Block (CB) 10 @Rp. 740.00 / Bh
19 Concrete Block (CB) 15 @Rp. 1,600.00 / Bh
20 Concrete Block (CB) 20 @Rp. 2,920.00 / Bh
21 Bondbeam 40x20x20 cm @Rp. 30,250.00 / Bh
22 Con Block warna type Holland tb 6 cm @Rp. 1,720.00 / Bh
23 Con Block warna type Uni pave tb 6 cm @Rp. 1,600.00 / Bh
24 Con Block warna type Dosex Six tb 6 cm @Rp. 1,840.00 / Bh
25 Con Block warna type Hexagon tb 6 cm @Rp. 1,710.00 / Bh
26 Con Block K 125 @Rp. 1,750.00 / Bh
27 Con Block K 175 @Rp. 2,700.00 / Bh
1### 3 4

D KAYU / LANGIT - LANGIT


1 Balok Kayu Jati @Rp. 23,925,000.00 / M3
2 Papan Kayu Jati @Rp. 24,104,440.00 / M3
3 Balok Kayu Damar Laut @Rp. 9,350,000.00 / M3
4 Papan Kayu Damar Laut @Rp. 9,650,000.00 / M3
5 Balok Kayu Meranti Batu @Rp. 9,075,000.00 / M3
6 Papan Kayu Meranti Batu @Rp. 9,375,000.00 / M3
7 Balok Kayu Kapur @Rp. 6,490,000.00 / M3
8 Papan kayu Kapur @Rp. 6,790,000.00 / M3
9 Balok Kayu Meranti Kls I @Rp. 5,225,000.00 / M3
10 Papan Kayu Meranti Kls I @Rp. 5,475,000.00 / M3
11 Kayu Sembarang @Rp. 2,500,000.00 / M3
11 Balok Kayu Sembarang @Rp. 2,500,000.00 / M3
11 Papan Kayu Sembarang @Rp. 2,500,000.00 / M3
14 Kayu Lat Asbes 5x30x400 mm @Rp. 7,430.00 / Btg
15 Kayu 5/7 @Rp. 87,780.00 / Btg
Papan @Rp. 2,200,000.00 M3
Balok @Rp. 2,200,000.00 M3
Paku @Rp. 25,000.00 Kg
@Rp.
@Rp.
@Rp.
16 Kayu Dolken / Kayu Laut Ø 7,5 - 10 / 400 cm @Rp. 19,250.00 / Btg
17 Bambu Ø 6 - 8 /600 cm @Rp. 13,750.00 / Btg
18 Bilik Bambu @Rp. 16,340.00 / M2
19 Kayu papan @Rp. 55,000.00 / M'
20 Kayu Profil 2" @Rp. 12,540.00 / M'
21 Kayu Profil 3" @Rp. 18,810.00 / M'
22 Kayu Profil 4" @Rp. 25,080.00 / M'
23 Profil Gypsum 2" @Rp. 4,600.00 / M'
24 Profil Gypsum 3" @Rp. 5,450.00 / M'
25 Profil Gypsum 4" @Rp. 6,660.00 / M'
26 Profil Gypsum 6" @Rp. 7,870.00 / M'
27 Plywood tebal @Rp. 90,000.00 / Lbr
Plywood tipis @Rp. 80,000.00 / Lbr
Bambu @Rp. 10,000.00 / Batang
27 Plywood 120x240 tbl. 18 mm @Rp. 233,640.00 / Lbr
28 Plywood 120x240 tbl. 12 mm @Rp. 155,760.00 / Lbr
29 Plywood 120x240 tbl. 9 mm @Rp. 116,820.00 / Lbr
30 Plywood 120x240 tbl. 6 mm @Rp. 77,880.00 / Lbr
31 Plywood 120x240 tbl. 4 mm @Rp. 51,920.00 / Lbr
32 Teakwood 120x240 tbl. 3 mm @Rp. 54,450.00 / Lbr
33 Triplek Jati 120x240 tbl. 3 mm @Rp. 85,250.00 / Lbr
34 Triplek Sungkai 120x240 tbl. 3 mm @Rp. 79,750.00 / Lbr
35 Formika 120x240 @Rp. 74,250.00 / Lbr
36 Soft Board 120x240 tbl. 4 mm @Rp. 55,990.00 / Lbr
37 Soft Board 120x240 tbl. 6 mm @Rp. 84,150.00 / Lbr
38 Soft Board 120x240 tbl. 9 mm @Rp. 126,230.00 / Lbr
39 Soft Board 120x240 tbl. 12 mm @Rp. 168,250.00 / Lbr
40 Gypsum 120x240 tbl. 6 mm @Rp. 59,950.00 / Lbr
41 Gypsum 120x240 tbl. 9 mm @Rp. 71,500.00 / Lbr
42 Gypsum 120x240 tbl. 12 mm @Rp. 93,500.00 / Lbr
43 Asbes Lokal 100x100 cm @Rp. 9,350.00 / Lbr
44 Asbes Atrisco 100x100 cm t= 4 mm @Rp. 11,550.00 / Lbr
45 Asbes Atrisco 100x100 cm t= 5 mm @Rp. 14,440.00 / Lbr
46 Asbes Atrisco 100x100 cm t= 6 mm @Rp. 17,330.00 / Lbr
47 Akustik 30x30 cm @Rp. 8,540.00 / Lbr
48 Akustik 30x60 cm @Rp. 17,070.00 / Lbr
49 Akustik 60x120 cm @Rp. 68,290.00 / Lbr
50 Rangka Furing Ceiling Gypsum @Rp. 52,250.00 / M2
51 Rangka Furing Dinding Gypsum @Rp. 63,800.00 / M2
52 Tepung Dempul @Rp. 10,450.00 / Kg
53 Kain kasa/Paper Tape @Rp. 57,750.00 / Roll
1### 3 4

E BESI / ALUMINIUM
1 Besi Beton polos @Rp. 125,000.00 / Batang
Besi 6 @Rp. 30,500.00 / Batang
Besi 8 @Rp. 50,000.00 / Batang
Besi 10 @Rp. 84,000.00 / Batang
Besi 12 @Rp. 125,000.00 / Batang
Besi 14 @Rp. 165,000 / Batang
Besi 16 @Rp. 235,000 / Batang
Besi 18 @Rp. - / Batang
Besi 20 @Rp. 275,000.00 / Batang
Besi 22 @Rp. / Kg
2 Besi Beton Ulir @Rp. 14,580.00 / Kg
3 Besi Profil WF/INP @Rp. 15,950.00 / Kg
4 Besi siku @Rp. 11,990.00 / Kg
5 Besi CNP @Rp. 13,090.00 / Kg
6 Besi Plat Strip @Rp. 11,880.00 / Kg
Besi Beton polos @Rp. 125,000.00 / Batang
7 Besi Plat Polos @Rp. 13,630.00 / Kg
8 Kawat Beton @Rp. 28,500.00 / Kg
9 Kawat Licin / Seng Polos @Rp. 22,530.00 / Kg
10 Kawat Duri @Rp. 4,030.00 / M'
11 Kawat Nyamuk @Rp. 11,980.00 / M2
12 Kawat Kasa @Rp. 13,920.00 / M2
13 Kawat Harmonika # 1" @Rp. 23,600.00 / M2
14 Kawat Burung @Rp. 12,710.00 / M2
15 Pagar kawat BRC 120 Polos @Rp. 235,950.00 / Lbr
16 Pintu Besi @Rp. 816,750.00 / M2
17 Pintu gulung Besi @Rp. 828,850.00 / M2
18 Pintu Lipat Besi @Rp. 837,320.00 / M2
19 Pintu Rolling Door @Rp. 465,850.00 / M2
20 Jerajak besi Bermotif @Rp. 347,270.00 / M2
21 Jerajak Besi Strip @Rp. 312,180.00 / M2
22 Rangka Baja Ringan @Rp. 177,870.00 / M2
23 Kosen Pintu Aluminium (80 x 210) Coklat @Rp. 405,350.00 / Bh
24 Kosen Pintu Aluminium (80 x 210) Putih @Rp. 371,470.00 / Bh
25 Kosen Jendela aluminium (120x60) Coklat @Rp. 287,380.00 / Bh
26 Kosen Jendela aluminium (120x60) Putih @Rp. 248,050.00 / Bh
27 Pintu Aluminium ( 80 x 210) Coklat @Rp. 711,480.00 / Bh
28 Pintu Aluminium ( 80 x 210) Putih @Rp. 609,840.00 / Bh
29 Jendela Aluminium + Kaca 5 mm (120 x 60) Coklat @Rp. 304,920.00 / Bh
30 Jendela Aluminium + Kaca 5 mm (120 x 60) Putih @Rp. 261,360.00 / Bh
31 Kosen Pintu / Jendela Aluminium Coklat @Rp. 78,650.00 / M'
32 Kosen Pintu / Jendela Aluminium Putih @Rp. 66,550.00 / M'
33 Daun Jendela Aluminium Coklat @Rp. 54,450.00 / M'
34 Daun Jendela Aluminium Putih @Rp. 48,400.00 / M'
35 Profil Aluminium T @Rp. 8,470.00 / M'
36 Ventions Blinds @Rp. 163,350.00 / M2
37 Verticals Blinds @Rp. 175,450.00 / M2
38 Bingkai Naco Niki Hitam @Rp. 201,660.00 / M2
39 Bingkai Naco Niki Putih @Rp. 168,060.00 / M2
40 Paku Beton 0,5 - 2" @Rp. 310.00 / Bh
41 Paku Beton 2" - 5" @Rp. 530.00 / Bh
42 Paku Biasa 0,5 - 2" @Rp. 16,940.00 / Kg
43 Paku Biasa 2" - 5" @Rp. 14,520.00 / Kg
43 Paku Biasa @Rp. 25,000.00 / Kg
44 Sekrup macam ukuran @Rp. 21,180.00 / Kg
45 Sekrup 0,5 - 2" @Rp. 420.00 / Bh
46 Sekrup fisher @Rp. 360.00 / Bh
47 Baut Ø 5/8" - 8" @Rp. 19,970.00 / Bh
48 Baut Angker Ø 3/4" - 10" @Rp. 45,380.00 / Bh
49 Baut Ramset / Dina Bolt @Rp. 720.00 / Bh
50 Rangka Atap Twin light @Rp. 302,500.00 / M2

1### 3 4

F PENUTUP LANTAI DAN DINDING


1 Ubin Granito 30 x 30 cm @Rp. 26,260.00 / Bh
2 Ubin Granito 40 x 40 cm @Rp. 46,590.00 / Bh
3 Ubin Granito 60 x 60 cm @Rp. 104,670.00 / Bh
4 Ubin Mosaik 30 x 30 cm @Rp. 13,920.00 / Bh
5 Ubin Marmer Ex. DN @Rp. 261,970.00 / M2
6 Ubin teralux marmer 30 x 30 cm @Rp. 27,230.00 / Bh
7 Ubin teralux marmer 40 x 40 cm @Rp. 48,400.00 / Bh
8 Ubin teralux marmer 60 x 60 cm @Rp. 109,510.00 / Bh
9 Ubin keramik 10 x 20 cm @Rp. 1,210.00 / Bh
10 Ubin keramik 15 x 15 cm @Rp. 1,400.00 / Bh
11 Ubin keramik 20 x 20 cm @Rp. 2,490.00 / Bh
12 Ubin keramik 20 x 25 cm @Rp. 3,150.00 / Bh
13 Ubin keramik 25 x 25 cm @Rp. 3,870.00 / Bh
14 Ubin keramik 30 x 30 cm @Rp. 5,570.00 / Bh
15 Ubin keramik 30 x 30 cm anti slip @Rp. 6,290.00 / Bh
16 Ubin keramik 40 x 40 cm @Rp. 9,680.00 / Bh
17 Ubin keramik artistik 5 x 20 cm @Rp. 910.00 / Bh
18 Ubin keramik artistik 10 x 10 cm @Rp. 910.00 / Bh
19 Ubin keramik artistik 10 x 20 cm @Rp. 1,760.00 / Bh
20 Ubin keramik Essenza 30 x 30 cm @Rp. 21,180.00 / Bh
21 Ubin keramik Essenza 40 x 40 cm @Rp. 37,630.00 / Bh
22 Porselin 11 x 11 cm Putih @Rp. 1,210.00 / Bh
23 Porselin 11 x 11 cm, warna @Rp. 145.00 / Bh
24 Porselin 15 x 15 cm, putih @Rp. 2,300.00 / Bh
25 Porselin 15 x 15 cm, warna @Rp. 2,540.00 / Bh
26 Plint ubin teralux marmer 10 x 30 cm @Rp. 16,340.00 / Bh
27 Plint ubin teralux marmer 10 x 40 cm @Rp. 29,040.00 / Bh
28 Plint ubin teralux marmer 10 x 60 cm @Rp. 65,700.00 / Bh
29 Plint ubin granito 10 x 30 cm @Rp. 27,950.00 / Bh
30 Plint ubin granito 10 x 40 cm @Rp. 62,800.00 / Bh
31 Plint ubin granito 10 x 60 cm @Rp. 157,180.00 / Bh
32 Plint ubin keramik 10 x 30 cm @Rp. 4,110.00 / Bh
33 Plint ubin keramik 10 x 40 cm @Rp. 5,690.00 / Bh
34 Plint ubin keramik 10 x 60 cm @Rp. 8,110.00 / Bh
35 Plint ubin keramik 15 x 30 cm @Rp. 5,810.00 / Bh
36 Plint ubin keramik 15 x 40 cm @Rp. 7,740.00 / Bh
37 Plint ubin keramik 15 x 60 cm @Rp. 11,620.00 / Bh
38 Batu Lapis Dinding 7x3x24 @Rp. 2,040.00 / Bh
39 Batu Tempel Hitam @Rp. 104,500.00 / M2
40 Batu Poros @Rp. 114,680.00 / M2
41 Carpet @Rp. 90,750.00 / M2
42 Carpet 80 % wool, 20 % nylon @Rp. 87,450.00 / M2
43 Feltex carpet 100 % wool-T-21 @Rp. 85,250.00 / M2
44 Underlyer tebal 6 mm / rubber corrugated @Rp. 104,500.00 / M2
45 Vynil asbes 30 x 30 cm @Rp. 8,230.00 / Bh
46 Vynil karet 30 x 30 cm KL I @Rp. 9,800.00 / Bh
47 Vynil karet 30 x 30 cm KL II @Rp. 9,080.00 / Bh
48 Vynil motif kembang ex DN 30 x 30 cm @Rp. 9,440.00 / Bh
49 Vynil wall covering lebar 50 cm @Rp. 63,250.00 / M2
50 Perquet Jati @Rp. 368,500.00 / M2
51 Gymfloor @Rp. 79,750.00 / M2
52 Paku Pancing 60 - 230 @Rp. 720.00 / Bh
53 Sekrup 3,5" @Rp. 410.00 / Kg
54 Sekrup 3,5" @Rp. 20,350.00 / Kg

1### 3 4

G PENUTUP ATAP
1 Atap Genteng Palentong @Rp. 1,670.00 / Bh
2 Atap Genteng Palentong super @Rp. 3,980.00 / Bh
3 Atap Genteng Kodok @Rp. 2,170.00 / Bh
4 Atap Genteng Beton @Rp. 5,970.00 / Bh
5 Atap Genteng Keramik @Rp. 11,390.00 / Bh
6 Atap Genteng Aspal @Rp. 11,320.00 / Lbr
7 Atap Genteng Metal/Multi Roof 35 @Rp. 64,130.00 / M2
8 Atap Genteng Asbes cement 0,35 @Rp. 66,790.00 / Lbr
9 Atap Sirap @Rp. 1,030.00 / Bh
10 Atap Aluminium gelombang tebal 0,55 @Rp. 98,180.00 / Lbr
11 Atap seng Gelombang 3' x 6' bjls 35 @Rp. 59,640.00 / Lbr
12 Atap seng Super Deck 3' x 6' tbl 0,30 @Rp. 68,750.00 / Lbr
13 Roof light fibreglass gelombang @Rp. 46,390.00 / Lbr
14 Atap Asbes Gelombang 1,8 x 1,05 tbl.4 mm @Rp. 59,380.00 / Lbr
15 Atap Asbes Gelombang 2,1 x 1,05 tbl.4 mm @Rp. 93,170.00 / Lbr
16 Atap Asbes Gelombang 2,4 x 1,05 tbl.4 mm @Rp. 108,130.00 / Lbr
17 Atap Asbes Gelombang 2,7 x 1,05 tbl.4 mm @Rp. 113,300.00 / Lbr
18 Atap Asbes Gelombang 1,8 x 0,92 tbl.5 mm @Rp. 70,950.00 / Lbr
19 Atap Asbes Gelombang 2,1 x 0,92 tbl.5 mm @Rp. 88,770.00 / Lbr
20 Atap Asbes Gelombang 2,4 x 0,92 tbl.5 mm @Rp. 97,020.00 / Lbr
21 Atap Asbes Gelombang 2,7 x 0,92 tbl.5 mm @Rp. 106,810.00 / Lbr
22 Atap Asbes Gelombang 1,8 x 1,08 tbl.6 mm @Rp. 103,620.00 / Lbr
23 Atap Asbes Gelombang 2,1 x 1,08 tbl.6 mm @Rp. 120,450.00 / Lbr
24 Atap Asbes Gelombang 2,4 x 1,08 tbl.6 mm @Rp. 128,370.00 / Lbr
25 Atap Asbes Gelombang 2,7 x 1,08 tbl.6 mm @Rp. 155,430.00 / Lbr
26 Genteng bubung palentong @Rp. 9,350.00 / Bh
27 Genteng bubung palentong super @Rp. 12,740.00 / Bh
28 Genteng bubung kodok @Rp. 9,560.00 / Bh
29 Nok genteng beton @Rp. 13,440.00 / Bh
30 Nok genteng keramik @Rp. 15,040.00 / Bh
31 Nok Genteng Aspal @Rp. 29,350.00 / Bh
32 Nok Genteng Metal/Multi Roof (decra bond) @Rp. 41,140.00 / Bh
33 Nok Genteng Asbes cement 0,35 @Rp. 33,770.00 / Lbr
34 Nok Aluminium standard 40 cm 18 swg22 @Rp. 47,890.00 / M2
35 Bubung/Nok Stel Gelombang 0,92 m' tbl.5 mm @Rp. 19,590.00 / Lbr
36 Bubung/Nok Stel Gelombang 1,05 m' tbl.4 mm @Rp. 25,990.00 / Lbr
37 Bubung/Nok Stel Gelombang 1,08 m' tbl.6 mm @Rp. 28,510.00 / Lbr
38 Bubung/Nok Paten 0,92 m' tbl.5 mm @Rp. 36,810.00 / Lbr
39 Bubung/Nok Paten 1,05 m' tbl.4 mm @Rp. 30,950.00 / Lbr
40 Bubung/Nok Paten 1,08 m' tbl.6 mm @Rp. 42,960.00 / Lbr
41 Bubung/Nok Stel Rata 0,92 m' tbl.5 mm @Rp. 36,080.00 / Lbr
42 Bubung/Nok Stel Rata 1,05 m' tbl.4 mm @Rp. 30,250.00 / Lbr
43 Bubung/Nok Stel Rata 1,08 m' tbl.6 mm @Rp. 40,600.00 / Lbr
44 Seng Plat 3" x 6" bjls 35 @Rp. 115,500.00 / Lbr
45 Seng Plat 3" x 6" bjls 30 @Rp. 103,950.00 / Lbr
46 Plastic aerator @Rp. 27,500.00 / Bh
47 Sisalation / aluminium foil @Rp. 77,200.00 / M2
48 Paku seng + Ring karet @Rp. 20,350.00 / Kg
49 Paku seng + Ring karet @Rp. 410.00 / Bh
50 Paku hak panjang 15 cm @Rp. 30,530.00 / Kg
51 Atap Seng Alumi Zinc warna 0,35 @Rp. 62,040.00 / M2
52 Atap Twin light @Rp. 74,250.00 / M2

1### 3 4

H KUNCI DAN KACA


1 Kunci tanam antik @Rp. 214,500.00 / Bh
2 Kunci tanam biasa @Rp. 90,020.00 / Bh
3 Kunci tanam kamar mandi @Rp. 54,690.00 / Bh
4 Kunci silinder @Rp. 34,490.00 / Bh
5 Kunci selot @Rp. 27,230.00 / Bh
6 Kunci lemari @Rp. 12,340.00 / Bh
7 Engsel pintu 4" @Rp. 15,130.00 / Bh
8 Engsel jendela 3" @Rp. 11,250.00 / Bh
9 Engsel angin @Rp. 25,050.00 / Bh
10 Kait angin @Rp. 19,120.00 / Bh
11 Rel pintu dorong @Rp. 160,330.00 / Bh
12 Sealent @Rp. 39,330.00 / Kg
13 Spring Knip @Rp. 9,080.00 / Bh
14 Door closer @Rp. 109,750.00 / Bh
15 Door handle @Rp. 113,010.00 / Bh
16 Door stoop @Rp. 38,120.00 / Bh
17 Espanyolet @Rp. 88,450.00 / Bh
18 Kaca Block 20 x 20 cm @Rp. 26,020.00 / Bh
19 Kaca polos tbl.3 mm @Rp. 87,120.00 / M2
20 Kaca polos tbl.5 mm @Rp. 145,200.00 / M2
21 Kaca polos tbl.8 mm @Rp. 232,320.00 / M2
22 Kaca Reyben tbl.5 mm @Rp. 193,120.00 / M2
23 Kaca Reyben tbl.8 mm @Rp. 308,980.00 / M2
24 Kaca Buram tbl.3 mm @Rp. 72,600.00 / M2
25 Kaca Buram tbl.5 mm @Rp. 111,320.00 / M2
26 Kaca buram tbl.8 mm @Rp. 193,600.00 / M2
27 Kaca cermin tbl.5 mm @Rp. 161,700.00 / M2
28 Kaca cermin tbl.6 mm @Rp. 194,040.00 / M2
29 Kaca cermin tbl.8 mm @Rp. 258,720.00 / M2
30 Kaca patri @Rp. 169,400.00 / M2
31 Kaca Wireglass @Rp. 151,250.00 / M2
32 Kaca Reyben Naco 30 x 60 cm tbl.5 mm @Rp. 13,590.00 / Lbr
33 Kaca Bening Naco 30 x 60 cm tbl.5 mm @Rp. 10,730.00 / Lbr

I CAT / MINYAK
1 Cat dasar @Rp. 15,730.00 / Kg
2 Cat Tembok setara Vinilex @Rp. 19,360.00 / Kg
3 Cat Minyak untuk kayu @Rp. 35,700.00 / Kg
4 Cat Minyak untuk Besi @Rp. 39,330.00 / Kg
5 Cat Menie kayu @Rp. 20,570.00 / Kg
6 Cat Menie besi @Rp. 25,410.00 / Kg
7 Cat sending @Rp. 54,450.00 / Kg
8 Cat Melamix @Rp. 59,290.00 / Kg
9 Cat Vernis Jadi @Rp. 48,280.00 / Kg
10 Plamir @Rp. 15,730.00 / Kg
11 Dempul gypsum @Rp. 10,410.00 / Kg
12 Dempul Cat @Rp. 11,860.00 / Kg
13 Minyak Cat @Rp. 11,010.00 / Kg
14 Minyak Bekisting @Rp. 6,290.00 / Ltr
15 Residu / Kolter @Rp. 6,530.00 / Ltr
16 Soda api @Rp. 12,100.00 / Kg
17 Sabun @Rp. 10,290.00 / Kg
18 Kuas @Rp. 7,870.00 / Bh
19 Ampelas / Kertas pasir @Rp. 1,820.00 / Lbr
20 Wall paper @Rp. 30,610.00 / M2

1### 3 4

J SANITASI / PIPA
1 Kloset duduk / monoblok lengkap tangki @Rp. 1,931,600.00 / Bh
2 Kloset duduk / monoblok tanpa tangki @Rp. 1,391,500.00 / Bh
3 Kloset jongkok porselin @Rp. 225,280.00 / Bh
4 Bakkif Porselin @Rp. 3,025,000.00 / Bh
5 Wastafel @Rp. 526,350.00 / Bh
6 Urinoir @Rp. 557,480.00 / Bh
7 Kran air Ø 1/2" - 3/4" @Rp. 27,350.00 / Bh
8 Kran air leher angsa Ø 1/2" @Rp. 77,200.00 / Bh
9 Kran shower @Rp. 92,570.00 / Bh
10 Kran Cebok @Rp. 72,240.00 / Bh
11 Bak fibreglass 0,3 M3 @Rp. 181,500.00 / Bh
12 Bak fibreglass 1 M3 @Rp. 522,720.00 / Bh
13 Bak cuci piring stainless 2 lobang @Rp. 466,700.00 / Bh
14 Bak cuci piring teraso 2 lobang @Rp. 272,250.00 / Bh
15 Tempat sabun keramik @Rp. 56,270.00 / Bh
16 Floor drain Ø 4" steinless @Rp. 15,000.00 / Bh
17 Stop kran Ø 3/4" @Rp. 27,500.00 / Bh
18 Tutup bak air Ø 1" Kuningan @Rp. 12,500.00 / Bh
19 Instalasi air bersih @Rp. 100,000.00 / Ttk
20 Instalasi air kotor/limbah @Rp. 125,000.00 / Ttk
21 Buis Beton 1/2 Ø 15 cm @Rp. 11,250.00 / M'
22 Buis Beton 1/2 Ø 20 cm @Rp. 17,790.00 / M'
23 Buis Beton 1/2 Ø 30 cm @Rp. 20,090.00 / M'
24 Buis Beton Ø 15 cm @Rp. 19,240.00 / M'
25 Buis Beton Ø 20 cm @Rp. 27,350.00 / M'
26 Buis Beton Ø 30 cm @Rp. 56,270.00 / M'
27 Buis Beton Ø 40 cm @Rp. 63,400.00 / M'
28 Buis Beton Ø 50 cm @Rp. 95,950.00 / M'
29 Buis Beton Ø 60 cm @Rp. 136,000.00 / M'
30 Buis Beton Ø 80 cm @Rp. 201,100.00 / M'
31 Buis Beton Ø 100 cm @Rp. 345,820.00 / M'
32 Pipa PVC Tipe AW Ø 1/2" @Rp. 25,300.00 / Btg
33 Pipa PVC Tipe AW Ø 3/4" @Rp. 7,440.00 / Btg
34 Pipa PVC Tipe AW Ø 1" @Rp. 13,620.00 / Btg
35 Pipa PVC Tipe AW Ø 1 1/2" @Rp. 19,670.00 / Btg
36 Pipa PVC Tipe AW Ø 2" @Rp. 23,190.00 / Btg
37 Pipa PVC Tipe AW Ø 2 1/2" @Rp. 26,620.00 / Btg
38 Pipa PVC Tipe AW Ø 3" @Rp. 29,840.00 / Btg
39 Pipa PVC Tipe AW Ø 4" @Rp. 49,920.00 / Btg
40 Pipa Besi Hitam Ø 1/2" @Rp. 14,770.00 / Btg
41 Pipa Besi Hitam Ø 3/4" @Rp. 20,140.00 / Btg
42 Pipa Besi Hitam Ø 1" @Rp. 29,520.00 / Btg
43 Pipa Besi Hitam Ø 1 1/2" @Rp. 37,580.00 / Btg
44 Pipa Besi Hitam Ø 2" @Rp. 47,600.00 / Btg
45 Pipa Besi Hitam Ø 2 1/2" @Rp. 50,220.00 / Btg
46 Pipa Galvanis Ø 1/2" @Rp. 14,770.00 / Btg
47 Pipa Galvanis Ø 3/4" @Rp. 20,140.00 / Btg
48 Pipa Galvanis Ø 1" @Rp. 29,520.00 / Btg
49 Pipa Galvanis Ø 1 1/4" @Rp. 33,560.00 / Btg
50 Pipa Galvanis Ø 1 1/2" @Rp. 37,580.00 / Btg
51 Pipa Galvanis Ø 2" @Rp. 205,000.00 / Btg
52 Pipa Galvanis Ø 2 1/2" @Rp. 52,440.00 / Btg
53 Fitting Pipa AW Ø 1" @Rp. /
54 Knee AW 1" @Rp. 5,230.00 / Bh
55 Tee AW 1" @Rp. 7,150.00 / Bh
56 Socht AW 1" @Rp. 4,680.00 / Bh
57 F-Knee 1" @Rp. / Bh
58 F-Tee 1" @Rp. 11,500.00 / Bh
59 Bocht LL-D 1" @Rp. 24,750.00 / Bh
60 Union Socht 1" @Rp. 7,430.00 / Bh
61 D-Nipple 1" @Rp. 18,150.00 / Bh
62 Water Moer 1" @Rp. 29,500.00 / Bh

1### 3 4

J SANITASI / PIPA
1 Kloset duduk / monoblok lengkap tangki @Rp. 1,931,600.00 / Bh
2 Kloset duduk / monoblok tanpa tangki @Rp. 1,391,500.00 / Bh
3 Kloset jongkok porselin @Rp. 225,280.00 / Bh
4 Bakkif Porselin @Rp. 3,025,000.00 / Bh
5 Wastafel @Rp. 526,350.00 / Bh
6 Urinoir @Rp. 557,480.00 / Bh
7 Kran air Ø 1/2" - 3/4" @Rp. 27,350.00 / Bh
8 Kran air leher angsa Ø 1/2" @Rp. 77,200.00 / Bh
9 Kran shower @Rp. 92,570.00 / Bh
10 Kran Cebok @Rp. 72,240.00 / Bh
11 Bak fibreglass 0,3 M3 @Rp. 181,500.00 / Bh
12 Bak fibreglass 1 M3 @Rp. 522,720.00 / Bh
13 Bak cuci piring stainless 2 lobang @Rp. 466,700.00 / Bh
14 Bak cuci piring teraso 2 lobang @Rp. 272,250.00 / Bh
15 Tempat sabun keramik @Rp. 56,270.00 / Bh
16 Floor drain Ø 4" steinless @Rp. 15,000.00 / Bh
17 Stop kran Ø 3/4" @Rp. 27,500.00 / Bh
18 Tutup bak air Ø 1" Kuningan @Rp. 12,500.00 / Bh
19 Instalasi air bersih @Rp. 100,000.00 / Ttk
20 Instalasi air kotor/limbah @Rp. 125,000.00 / Ttk
21 Buis Beton 1/2 Ø 15 cm @Rp. 11,250.00 / M'
22 Buis Beton 1/2 Ø 20 cm @Rp. 17,790.00 / M'
23 Buis Beton 1/2 Ø 30 cm @Rp. 20,090.00 / M'
24 Buis Beton Ø 15 cm @Rp. 19,240.00 / M'
25 Buis Beton Ø 20 cm @Rp. 27,350.00 / M'
26 Buis Beton Ø 30 cm @Rp. 56,270.00 / M'
27 Buis Beton Ø 40 cm @Rp. 63,400.00 / M'
28 Buis Beton Ø 50 cm @Rp. 95,950.00 / M'
29 Buis Beton Ø 60 cm @Rp. 136,000.00 / M'
30 Buis Beton Ø 80 cm @Rp. 201,100.00 / M'
31 Buis Beton Ø 100 cm @Rp. 345,820.00 / M'
32 Bodeam 30 x 60 cm @Rp. 25,300.00 / Bh
33 Pipa PVC Tipe AW Ø 1/2" @Rp. 5,540.00 / M'
34 Pipa PVC Tipe AW Ø 3/4" @Rp. 7,440.00 / M'
35 Pipa PVC Tipe AW Ø 1" @Rp. 13,620.00 / M'
36 Pipa PVC Tipe AW Ø 1 1/2" @Rp. 19,670.00 / M'
37 Pipa PVC Tipe AW Ø 2" @Rp. 23,190.00 / M'
38 Pipa PVC Tipe AW Ø 2 1/2" @Rp. 26,620.00 / M'
39 Pipa PVC Tipe AW Ø 3" @Rp. 29,840.00 / M'
40 Pipa PVC Tipe AW Ø 4" @Rp. 49,920.00 / M'
41 Pipa Besi Hitam Ø 1/2" @Rp. 14,770.00 / M'
42 Pipa Besi Hitam Ø 3/4" @Rp. 20,140.00 / M'
43 Pipa Besi Hitam Ø 1" @Rp. 29,520.00 / M'
44 Pipa Besi Hitam Ø 1 1/2" @Rp. 37,580.00 / M'
45 Pipa Besi Hitam Ø 2" @Rp. 47,600.00 / M'
46 Pipa Besi Hitam Ø 2 1/2" @Rp. 50,220.00 / M'
47 Pipa Galvanis Ø 1/2" @Rp. 14,770.00 / M'
48 Pipa Galvanis Ø 3/4" @Rp. 20,140.00 / M'
49 Pipa Galvanis Ø 1" @Rp. 29,520.00 / M'
50 Pipa Galvanis Ø 1 1/4" @Rp. 33,560.00 / M'
51 Pipa Galvanis Ø 1 1/2" @Rp. 37,580.00 / M'
52 Pipa Galvanis Ø 2" @Rp. 47,600.00 / M'
53 Pipa Galvanis Ø 2 1/2" @Rp. 52,440.00 / M'
Fitting Pipa AW Ø 1" yang terdiri dari : @Rp. /
54 Fitting Knee AW 1" @Rp. 5,230.00 / Bh
55 Fitting Tee AW 1" @Rp. 7,150.00 / Bh
56 Fitting Socht AW 1" @Rp. 4,680.00 / Bh
57 Bocht LL-D 1" @Rp. 24,750.00 / Bh
58 Union Socht 1" @Rp. 7,430.00 / Bh
59 D-Nipple 1" @Rp. 18,150.00 / Bh

1### 3 4

K LISTRIK / ACSESORIES
1 Lampu TL 1 x 20 W Lengkap Kotak @Rp. 54,450.00 / Set
2 Lampu TL 1 x 40 W Lengkap Kotak @Rp. 60,500.00 / Set
3 Lampu TL 2 x 20 W Lengkap Kotak @Rp. 163,350.00 / Set
4 Lampu TL 2 x 40 W Lengkap Kotak @Rp. 183,920.00 / Set
5 Lampu TL Bambu 1 x 20 W Lengkap @Rp. 108,900.00 / Set
6 Lampu TL Bambu 1 x 40 W Lengkap @Rp. 123,420.00 / Set
7 Lampu XL 5 W + Fitting @Rp. 25,410.00 / Set
8 Lampu XL 8 W + Fitting @Rp. 27,230.00 / Set
9 Lampu XL 10 W + Fitting @Rp. 29,040.00 / Set
10 Lampu XL 14 W + Fitting @Rp. 33,280.00 / Set
11 Lampu XL 18 W + Fitting @Rp. 33,880.00 / Set
12 Lampu XL 24 W + Fitting @Rp. 38,720.00 / Set
13 Lampu Downlight 5 W lengkap @Rp. 54,450.00 / Set
14 Lampu Pijar 5 w + Fitting @Rp. 8,250.00 / Set
15 Lampu Pijar 10 w + Fitting @Rp. 8,800.00 / Set
16 Lampu Pijar 15 w + Fitting @Rp. 9,350.00 / Set
17 Lampu Pijar 20 w + Fitting @Rp. 9,900.00 / Set
18 Lampu Pijar 25 w + Fitting @Rp. 10,450.00 / Set
19 Lampu Pijar 40 w + Fitting @Rp. 11,550.00 / Set
20 Stop Kontak tanam @Rp. 10,290.00 / Bh
21 Saklar tunggal @Rp. 14,520.00 / Bh
22 Saklar ganda @Rp. 15,730.00 / Bh
23 Saklar Triple @Rp. 18,150.00 / Bh
24 Zekring box 1 grup @Rp. 26,620.00 / Unit
25 Zekring box 2 grup @Rp. 31,350.00 / Unit
26 Zekring box 3 grup @Rp. 38,500.00 / Unit
27 Zekring box 4 grup @Rp. 46,200.00 / Unit
28 MCB 2 Ampere @Rp. 35,200.00 / Unit
29 MCB 4 Ampere @Rp. 42,900.00 / Unit
30 MCB 6 Ampere @Rp. 67,760.00 / Unit
31 MCB 8 Ampere @Rp. 99,220.00 / Unit
32 Kabel Listrik NYA Ø 1,5 mm @Rp. 1,120.00 / M'
33 Kabel Listrik NYA Ø 2,5 mm @Rp. 1,930.00 / M'
34 Kabel Listrik NYA Ø 4 mm @Rp. 8,250.00 / M'
35 Kabel Listrik NYM 2 Ø 1,5 mm @Rp. 4,020.00 / M'
36 Kabel Listrik NYM 2 Ø 2,5 mm @Rp. 9,900.00 / M'
37 Kabel Listrik NYM 2 Ø 4 mm @Rp. 15,970.00 / M'
38 Instalasi Listrik titik api / Lampu nyala @Rp. 101,750.00 / Ttk
NO Koef Satuan Uraian Pekerjaan Volume
1 PEKERJAAN PEMASANGAN 1M2 BOWPLANK 15.2

0.1 HOK Pekerja 1.520


0.1 HOK Tukang 1.520
0.005 HOK Mandor 0.076
0.007 M3 Papan 0.106
0.012 M3 Balok 0.182
0.02 Kg Paku 0.304

PEMBERSIHAN LAPANGAN DAN PERATAAN


15.2
0.1 HOK Pekerja 1.520
0.05 HOK Mandor 0.760

2 PEKERJAAN TANAH 48.098


a. Galian Tanah
- Pondasi Jembatan
0.735 HOK Pekerja 35.352
0.0735 HOK Tukang 3.535
0 HOK Mandor -

- Pondasi Talud 15.136


0.735 HOK Pekerja 11.125
0.0735 HOK Tukang 1.112
0 HOK Mandor -
PEKERJAAN URUGAN TANAH
0.0052 HOK Pekerja
0.001 HOK Tukang
HOK Mandor

3 PEKERJAAN URUGAN PASIR BAWAH PONDASI


- Pondasi Jembatan 7.2
1.1 M3 Pasir Urug 7.920
0.1368 HOK Pekerja 0.985
0.0274 HOK Tukang 0.197

- Pondasi Talud 0.5504


1.1 M3 Pasir Urug 0.605
0.1368 HOK Pekerja 0.075
0.0274 HOK Tukang 0.015

4 PEKERJAAN BATU KOSONG


- Pondasi Jembatan 3.6
Pasir Urug
1.1 M3 Batu Kali 3.960
0.75 HOK Pekerja 2.700
0.25 HOK Tukang 0.900
0.125 HOK Mandor 0.450

- Pondasi Talud 0.1376


Pasir Urug
1.1 M3 Batu Kali 0.151
0.75 HOK Pekerja 0.103
0.25 HOK Tukang 0.034
0.125 HOK Mandor 0.017

5 PEKERJAAN PASANGAN BATU KALI


- Pondasi Jembatan 45.388
1.1 M3 Batu Kali 49.927
202 Kg Semen PC 9,168.376
0.485 M3 Pasir Pasang 22.013
1.5 HOK Pekerja 68.082
0.6 HOK Tukang 27.233
0.075 HOK Mandor 3.404

- Pondasi Talud 15.136


1.1 M3 Batu Kali 16.650
202 Kg Semen PC 3,057.472
0.485 M3 Pasir Pasang 7.341
1.5 HOK Pekerja 22.704
0.6 HOK Tukang 9.082
0.075 HOK Mandor 1.135

- Tembok Pengaman 3.2


1.1 M3 Batu Kali 3.520
202 Kg Semen PC 646.400
0.485 M3 Pasir Pasang 1.552
1.5 HOK Pekerja 4.800
0.6 HOK Tukang 1.920
0.075 HOK Mandor 0.240

6 PEKERJAAN BETON
a. Balok Tumpuan 2.5
0.200 M3 Kayu Sembarang 0.500
1.333 Kg Paku biasa 3.333
Batang Besi beton polos -

3.333 Kg Kawat beton 8.333


366.667 Kg Semen PC 916.667
0.600 M3 Pasir beton 1.500
1.000 M3 Kerikil pecah 2.500
6.667 HOK Pekerja 16.667
2.200 HOK Tukang batu 5.500
2.200 HOK Tukang kayu 5.500
2.200 HOK Tukang besi 5.500
0.667 HOK Kepala tukang 1.667
0.333 HOK Mandor 0.833

b. Balok Gelagar 2.736


0.200 M3 Kayu Sembarang 0.547
1.333 Kg Paku biasa 3.648
- Batang Besi beton polos -
3.333 Kg Kawat beton 9.120
366.667 Kg Semen PC 1,003.200
0.600 M3 Pasir beton 1.642
1.000 M3 Kerikil pecah 2.736
6.667 HOK Pekerja 18.240
2.200 HOK Tukang batu 6.019
2.200 HOK Tukang kayu 6.019
2.200 HOK Tukang besi 6.019
0.667 HOK Kepala tukang 1.824
0.333 HOK Mandor 0.912

d. Plat Jembatan 3.04


0.200 M3 Kayu Sembarang 0.608
1.333 Kg Paku biasa 4.053
- Batang Besi beton polos -
3.333 Kg Kawat beton 10.133
366.667 Kg Semen PC 1,114.667
0.600 M3 Pasir beton 1.824
1.000 M3 Kerikil pecah 3.040
6.667 HOK Pekerja 20.267
2.200 HOK Tukang batu 6.688
2.200 HOK Tukang kayu 6.688
2.200 HOK Tukang besi 6.688
0.667 HOK Kepala tukang 2.027
0.333 HOK Mandor 1.013
-

8 PEKERJAAN BESI
a. 1 M Bal 10

Besi 14
1.5 Batang Besi 12 15.000
0.863889 Batang Besi 8 8.639
0.0034 kg Kawat Beton 0.034
0.7 HOK Pekerja 7.000
0.043 HOK Tukang 0.430
0.004 HOK Mandor 0.040

b. 1 M Bal 11.4
0.666667 Batang Besi 16 7.600
0.166667 Batang Besi 14 1.900
Batang Besi 12 -
0.7 Kg Kawat Beton 7.980
0.7 HOK Pekerja 7.980
0.043 HOK Tukang 0.490
0.004 HOK Mandor 0.046

c. 1 M2 Pl 15.2
6.666667 Batang Besi 14 101.333
6.666667 Batang Besi 12 101.333
1.2 Kg Kawat Beton 18.240
2.7 HOK Pekerja 41.040
0.27 HOK Tukang 4.104
0.027 HOK Mandor 0.410

d. Beton 6
4 Batang Besi 10 24.000
4.666667 Batang Besi 6 28.000
0.4 Kg Kawat Beton 2.400
0.45 HOK Pekerja 2.700
0.045 HOK Tukang 0.270
0.005 HOK Mandor 0.030

8 PEKERJAAN PIPA PENGAMAN


a. Memasang 1 Meter Pipa 2' di Tepi Jembatan 22.8
0.3333 M' Pipa Galvanis Ø 2" 7.599
0.24 HOK Pekerja 5.472
0.08 HOK Tukang 1.824
0.04 HOK Mandor 0.912

9 PEKERJAAN PLASTERAN
a. Mengerjakan 1 M2 Palsteran di bagian Temb 16
0.026 M3 Pasir Pasang 0.416
10.8 Kg Semen PC 172.800
0.25 HOK Pekerja 4.000
0.2 HOK Tukang 3.200
0.02 HOK Mandor 0.320

b. Mengerjakan 1 M2 Palsteran di bagian Beton 3.6


0.026 M3 Pasir Pasang 0.094
10.8 Kg Semen PC 38.880
0.25 HOK Pekerja 0.900
0.2 HOK Tukang 0.720
0.02 HOK Mandor 0.072

9 PEKERJAAN ACIAN
a. Mengerjakan 1 M2 Acian di bagian Tembok P 16

3 Kg Semen PC 52.000
0.2 HOK Pekerja 3.200
0.1 HOK Tukang 1.600
0.01 HOK Mandor 0.160

b. Mengerjakan 1 M2 Acian di bagian Beton Pen 3.6

3.25 Kg Semen PC 11.700


0.20 HOK Pekerja 0.720
0.10 HOK Tukang 0.360
0.01 HOK Mandor 0.036

PEKERJAAN 1M' BESI ANGKUR 18


1 Kg Besi 12 18.000
0.06 HOK Pekerja 1.080
0.06 HOK Tukang 1.080
0.0076 HOK Mandor 0.137
Harga Satuan Total Harga

85,000 129,200
100,000 152,000
100,000 7,600
2,200,000 234,080
2,200,000 401,280
25,000 7,600
-
-
-
85,000 129,200
100,000 76,000
-
-
-
- 3,358,443
- Panjang
85,000 3,004,923 1 4
100,000 353,520 2 4
100,000 - 3 4
- 4 4
-
-
- 1,056,871
85,000 945,622 2.15
100,000 111,250
100,000 -
-
85,000 -
100,000 -
100,000 -
-
-
- 4
- 134,037,505
230,000 1,821,600
85,000 83,722
100,000 19,728
-
-
- 2.15
230,000 139,251
85,000 6,400
100,000 1,508
-
-
-
-
-
230,000 910,800 4
85,000 229,500
100,000 90,000
100,000 45,000
-
-
-
230,000 34,813 2.15
85,000 8,772
100,000 3,440
100,000 1,720
-
-
-
230,000 11,483,164 1 4
1,500 13,752,564 2 4
250,000 5,503,295 3 4
85,000 5,786,970 4 4
100,000 2,723,280
100,000 340,410
-
- 2.15
230,000 3,829,408
1,500 4,586,208
250,000 1,835,240
85,000 1,929,840
100,000 908,160
100,000 113,520
-
- 2
230,000 809,600
1,500 969,600
250,000 388,000
85,000 408,000
100,000 192,000
100,000 24,000
-
-
- 1 4
2,500,000 1,250,000 2 4
25,000 83,333
125,000 - - Batang
-
28,500 237,500
1,500 1,375,000
255,000 382,500
400,000 1,000,000
85,000 1,416,667
100,000 550,000
100,000 550,000
100,000 550,000
100,000 166,667
100,000 83,333
-
-
- 3.8
2,500,000 1,368,000
25,000 91,200
125,000 -
28,500 259,920
1,500 1,504,800
255,000 418,608
400,000 1,094,400
85,000 1,550,400
100,000 601,920
100,000 601,920
100,000 601,920
100,000 182,400
100,000 91,200
-
-
-
-
-
-
2,500,000 1,520,000 4
25,000 101,333
125,000 -
28,500 288,800
1,500 1,672,000
255,000 465,120
400,000 1,216,000
85,000 1,722,667
100,000 668,800
100,000 668,800
100,000 668,800
100,000 202,667
100,000 101,333
-
-
-
-
- Besi 12
- Besi 8
125,000 1,875,000 Panjang Balok
50,000 431,944
28,500 969
85,000 595,000
100,000 43,000
100,000 4,000
-
-
235,000 1,786,000 Besi 14
165,000 313,500 Besi 16
125,000 - Panjang Ba
28,500 227,430
85,000 678,300
100,000 49,020
100,000 4,560
-
-
165,000 16,720,000 Besi 14
125,000 12,666,667 Besi 12
28,500 519,840 Luas Plat
85,000 3,488,400
100,000 410,400
100,000 41,040
-
- Besi 10
84,000 2,016,000 Besi 6
30,500 854,000 Panjang Balok Pengaman
28,500 68,400
85,000 229,500
100,000 27,000
100,000 3,000
-
-
-
205,000 1,557,844
85,000 465,120
100,000 182,400
100,000 91,200
-
-
-
-
-
-
-
250,000 104,000
1,500 259,200
85,000 340,000
100,000 320,000
100,000 32,000
-
-
250,000 23,400
1,500 58,320
85,000 76,500
100,000 72,000
100,000 7,200
-
-
-
-
1,500 78,000
85,000 272,000
100,000 160,000
100,000 16,000
-
-
-
1,500 17,550
85,000 61,200
100,000 36,000
100,000 3,600
-
-
-
125,000 2,250,000
85,000 91,800
100,000 108,000
100,000 13,680
139,589,779
Lebar Tinggi Jumlah Satuan CM Vol
1.8 1 2 14.4
1.4 3.55 2 39.76
0.47 3.55 2 6.674
0.18 0.85 2 0.612

4.4 0.4 4 15.136

1.8 0.5 2 7.2

0.04 0.4 4 4 0.5504

1.8 0.25 2 3.6


0.04 0.4 4 0.1376

1.8 0.75 2 10.8


1.4 3.55 2 39.76
0.23 3.55 2 6.532
0.2 0.85 2 1.36

0.4 4.4 4 15.136

0.4 1 4 3.2

0.65 0.85 2 4.42


0.4 0.6 2 1.92

0.4 0.3 6 2.736


3.8 0.2 1 3.04

18 Meter 1.5 Batang/1 meter balok


10.36667 0.863889 Batang/1 meter balok
Panjang Balok 10 M

8 m 0.666667
2 m 0.166667
11.4 m

6.666667
6.666667
15.2

4
4.666667
Panjang Balok Pengaman 6

3.8 3 2 22.8

2 1 1 4 16

3.6
NO Koef Satuan Uraian Pekerjaan Volume
1 PEKERJAAN PEMASANGAN 1M2 BOWPLANK
0.007 M3 Papan
0.012 M3 Balok
0.1 HOK Pekerja
0.1 HOK Tukang
0.005 HOK Mandor
2 PEKERJAAN TANAH
a. Galian Tanah
- Pondasi Jembatan
0.4 HOK Pekerja
0.04 HOK Tukang
0 HOK Mandor

- Pondasi Talud
0.4 HOK Pekerja
0.04 HOK Tukang
0 HOK Mandor

3 PEKERJAAN TANAH
a. Galian Tanah
- Pondasi Jembatan
1 M3 Galian Tanah sedalam 1 M
0.4 HOK Pekerja
0.04 HOK Tukang
0 HOK Mandor

1 M3 Galian Tanah kedalam 1-2 M


0.526 HOK Pekerja
0.0526 HOK Tukang
0 HOK Mandor

1 M3 Galian Tanah kedalam 2-3 M


0.526 HOK Pekerja
0.0526 HOK Tukang
0 HOK Mandor

- Pondasi Talud
1 M3 Galian Tanah sedalam 1 M
0.735 HOK Pekerja
0.0735 HOK Tukang
0 HOK Mandor

1 M3 Galian Tanah kedalam 1-2 M


0.735 HOK Pekerja
0.0735 HOK Tukang
0 HOK Mandor

1 M3 Galian Tanah kedalam 2-3 M


0.735 HOK Pekerja
0.0735 HOK Tukang
0 HOK Mandor

PEKERJAAN URUGAN TANAH


0.0052 HOK Pekerja
0.001 HOK Tukang
HOK Mandor

3 PEKERJAAN URUGAN PASIR BAWAH PONDASI


- Pondasi Jembatan
1.1 M3 Pasir Urug
0.1368 HOK Pekerja
0.0274 HOK Tukang

- Pondasi Talud
1.1 M3 Pasir Urug
0.1368 HOK Pekerja
0.0274 HOK Tukang

4 PEKERJAAN BATU KOSONG


- Pondasi Jembatan
Pasir Urug
1.1 M3 Batu Kali
0.75 HOK Pekerja
0.25 HOK Tukang
0.125 HOK Mandor

- Pondasi Talud
Pasir Urug
1.1 M3 Batu Kali
0.75 HOK Pekerja
0.25 HOK Tukang
0.125 HOK Mandor

5 PEKERJAAN PASANGAN BATU KALI


- Pondasi Jembatan
1.1 M3 Batu Kali
202 Kg Semen PC
0.485 M3 Pasir
1.5 HOK Pekerja
0.6 HOK Tukang
0.075 HOK Mandor

- Pondasi Talud
1.1 M3 Batu Kali
202 Kg Semen PC
0.485 M3 Pasir
1.5 HOK Pekerja
0.6 HOK Tukang
0.075 HOK Mandor

- Tembok Pengaman
1.1 M3 Batu Kali
202 Kg Semen PC
0.485 M3 Pasir
1.5 HOK Pekerja
0.6 HOK Tukang
0.075 HOK Mandor
6 PEKERJAAN BETON
a. Balok Tumpuan
0.200 M3 Kayu Sembarang
1.333 Kg Paku biasa
240.000 Kg Besi beton polos
3.333 Kg Kawat beton
366.667 Kg Semen PC
0.600 M3 Pasir beton
1.000 M3 Kerikil pecah
6.667 HOK Pekerja
2.200 HOK Tukang batu
2.200 HOK Tukang kayu
2.200 HOK Tukang besi
0.667 HOK Kepala tukang
0.333 HOK Mandor

b. Balok Gelagar
0.200 M3 Kayu Sembarang
1.333 Kg Paku biasa
240.000 Kg Besi beton polos
3.333 Kg Kawat beton
366.667 Kg Semen PC
0.600 M3 Pasir beton
1.000 M3 Kerikil pecah
6.667 HOK Pekerja
2.200 HOK Tukang batu
2.200 HOK Tukang kayu
2.200 HOK Tukang besi
0.667 HOK Kepala tukang
0.333 HOK Mandor

d. Plat Jembatan
0.200 M3 Kayu Sembarang
1.333 Kg Paku biasa
240.000 Kg Besi beton polos
3.333 Kg Kawat beton
366.667 Kg Semen PC
0.600 M3 Pasir beton
1.000 M3 Kerikil pecah
6.667 HOK Pekerja
2.200 HOK Tukang batu
2.200 HOK Tukang kayu
2.200 HOK Tukang besi
0.667 HOK Kepala tukang
0.333 HOK Mandor

8 PEKERJAAN BESI
a. Balok Tumpuan
Besi 14
Besi 12
Besi 10
Kawat Beton
Pekerja
Tukang
Mandor

b. Balok Gelagar
Besi 16
Besi 14
Besi 12
Kawat Beton
Pekerja
Tukang
Mandor

c. Plat Jembatan
Besi 14
Besi 12
Kawat Beton
Pekerja
Tukang
Mandor

d. Beton Pengaman
Besi 10
Besi 6
Kawat Beton
Pekerja
Tukang
Mandor

8 PEKERJAAN PIPA PENGAMAN


a. Memasang 1 Meter Pipa 2' di Tepi Jembatan
0.3333 M' Pipa Besi Gif 2"
0.24 HOK Pekerja
0.08 HOK Tukang
0.04 HOK Mandor

9 PEKERJAAN PLASTERAN
a. Mengerjakan 1 M2 Palsteran di bagian Tembok Pengaman
0.026 M3 Pasir
10.8 Kg Semen PC
0.25 HOK Pekerja
0.2 HOK Tukang
0.02 HOK Mandor

b. Mengerjakan 1 M2 Palsteran di bagian Beton Pengaman


0.026 M3 Pasir
10.8 Kg Semen PC
0.25 HOK Pekerja
0.2 HOK Tukang
0.02 HOK Mandor
9 PEKERJAAN ACIAN
a. Mengerjakan 1 M2 Acian di bagian Tembok Pengaman

3 Kg Semen PC
0.2 HOK Pekerja
0.1 HOK Tukang
0.01 HOK Mandor

b. Mengerjakan 1 M2 Acian di bagian Beton Pengaman

3.25 Kg Semen PC
0.20 HOK Pekerja
0.10 HOK Tukang
0.01 HOK Mandor

PEKERJAAN 1M' BESI ANGKUR


1 Besi 12
0.06 Pekerja
0.06 Tukang
0.0076 Mandor

Analisa Perhitungan Besi Beton pada Pekerjaan Jembatan

1 Balok Balok Tumpuan 2 Buah Panjang 5 M Panjang (m)

18 Besi 12 Panjang 5 M 5.1


42 Besi 8 Panjang (2x 65 cm + 2 x 85 cm + 2 x 5 cm) 3.1

2 Balok Belagar 3 Buah Panjang 3,8 m


10 Besi 14 Panjang 380 cm 3.9
2 Besi 16 Panjang 380 cm 3.9
26 Besi 8 panjang ((2 x 26 cm)+(2 x 36 cm)+(2x5 cm)) 1.34

3 Plat Beton Jembatan Ukuran 5 x 3,8 m


1. Lapisan Atas
100 Besi 12 Panjang 380 cm 3.9
26 Besi 12 Panjang 500 cm 5.1

2. Lapisan Bawah
100 Besi 14 Panjang 380 cm 3.9
26 Besi 14 Panjang 500 cm 5.1
4 Tiang Pengaman Pinggiran Jembatan sejumlah 6 Unit Ukuran 10 x 20 cm Panjang 1 m
4 Besi 10 Panjang 1 m 1.1
7 Besi 6 Panjang (2 x 8)+(2 x 18) cm 0.62

5Besi Stek pada Balok Tumpuan


6 Besi 12 Panjang 50 cm 0.6
Harga Satuan Total Harga

50.66667

Jumlah Besi dalam meter


Jumlah besi dalam batang
Jumlah Unit Pembulatan
Jumlah (m) Jumlah (Batang) Satuan
Pekerjaan Jumlah Total
2 91.8 7.65 16 Batang
2 130.2 10.85 22 Batang

3 39 3.25 12 Batang
3 7.8 0.65 3 Batang
3 34.84 2.9033333333 9 Batang

1 390 32.5 33 Batang


1 132.6 11.05 12 Batang

1 390 32.5 33 Batang


1 132.6 11.05 12 Batang
Panjang 1 m
6 4.4 0.3666666667 6 Batang
6 4.34 0.3616666667 6 Batang

6 3.6 0.3 6 Batang

Jadi Jumlah Kebutuhan Besi pada Jembatan adalah


Besi 16 3 Batang
Besi 14 57 Batang
Besi 12 55 Batang
Besi 10 6 Batang
Besi 8 31 Batang
Besi 6 6 Batang
66.66667
Nama Besi Panjang Berat Total Berat/M
6 12 2.66 0.221666667
6.5 12 3.11 0.259166667
7 12 3.63 0.3025
7.5 12 4.18 0.348333333
8 12 4.74 0.395
8.5 12 5.35 0.445833333
9 12 6 0.5
10 12 7.4 0.616666667
10.2 12 8.2 0.683333333
12 12 10.7 0.891666667
13 12 12.5 1.041666667
14 12 14.5 1.208333333
15 12 16.65 1.3875
16 12 19 1.583333333
17.5 12 22.5 1.875
19 12 26.76 2.23
20.5 12 31 2.583333333
22 12 35.76 2.98
23.5 12 40.85 3.404166667
25 12 46.2 3.85
28 12 58 4.833333333
32 12 75.75 6.3125
DETAIL / RINCIAN RENCANA ANGGARAN BIAYA

Desa : BATULOHE No. RAB : 03/RAB/DBL/I/2020


Kecamatan : BULUKUMPA Program : KEGIATAN PEKERJAAN PRASARANA DESA
Kabupaten : BULUKUMBA Jenis Kegiatan : PEKERJAAN PEMBANGUNAN JEMBATAN
Provinsi : SULAWESI SELATAN Ukuran/Dimensi : 5 X 3,8
Lokasi : Dusun BATUNILAMUNG SUMBER DANA : DDS

Volume
Harga Jumlah Swadaya
Uraian Dari Jumlah Biaya (Rp)
Total Dari Dana Satuan Satuan (Rp) (Rp)
Swadaya

BAHAN
1 Pasir Urug 9.0 M3 230,000 2,070,000
2 Batu Kali 75.0 M3 230,000 17,250,000
3 Semen PC 405.0 Zak 75,000 30,375,000
4 Pasir Pasang 32.0 M3 250,000 8,000,000
5 Kayu Sembarang 2.0 M3 2,200,000 4,400,000
6 Paku campuran 12.0 Kg 25,000 300,000
7 Besi beton polos - Batang 125,000 -
8 Kawat beton 57.0 Kg 28,500 1,624,500
9 Pasir beton 8.0 M3 255,000 2,040,000
10 Kerikil pecah 9.0 M3 400,000 3,600,000
11 Besi 14 57.0 Batang 165,000 9,405,000
12 Besi 12 55.0 Batang 125,000 6,875,000
13 Besi 8 31.0 Batang 50,000 1,550,000
14 Besi 16 3.0 Batang 235,000 705,000
15 Besi 10 6.0 Batang 84,000 504,000
16 Besi 6 6.0 Batang 30,500 183,000
17 Pipa Galvanis Ø 2" 8.0 Batang 205,000 1,640,000
18 Sirtu Tibunan M3 230,000 -
19 Bambu 100.0 Batang 10,000 1,000,000
Sub Total (1) 91,521,500
PERALATAN -
20 Gerobak 1 Buah 550,000 550,000
21 Benang 5 Roll 12,000 60,000
22 Prasasti 1 Buah 500,000 500,000
23 Papan Proyek 1 Buah 100,000 100,000
24 Sekop 3 Buah 100,000 300,000
25 Sewa Moleng 60 HK 350,000 21,000,000

Sub Total (1) 22,510,000


UPAH -

26 Pekerja 400 HOK 85,000 34,000,000


27 Tukang 172 HOK 100,000 17,200,000
28 Kepala Tukang 78 HOK 100,000 7,800,000
29 Mandor 43 HOK 100,000 4,300,000
-
-
-
-

Sub Total (1) 63,300,000


TOTAL BIAYA -
DDS 177,332,000
Sumber Dana
Swadaya

Batulohe, 5 Januari 2020


Dibuat Oleh:
Disetujui Oleh: Tenaga Perencana Tim Pengelola Kegiatan (TPK)
Kepala Desa Batulohe Infrastruktur Desa

IBNU HAJAR ………………….. ......................................


REKAPITULASI RENCANA ANGGARAN BIAYA

PROGRAM NO RAB : : 03/RAB/DBL/I/2020


KEGIATAN : KEGIATAN PEKERJAAN PRASARANA DESA LOKASI : Dusun Bontorannu
PEKERJAAN : PEKERJAAN PAVING BLOK SUMBER DANA : : DDS
TAHUN ANGGARAN : 2020 VOLUME : 215 X 3,5 M

Kegiatan : Kegiatan :
Ukuran : Ukuran :
Jumlah Total
No. Uraian Jumlah : Jumlah : Bobot (%)
No. RAB : No. RAB :
DD Swadaya ADD Swadaya DD/ADD Swadaya
A BAHAN 91,521,500 91,521,500 51.61%
B PERALATAN 22,510,000 22,510,000 12.69%
C UPAH 63,300,000 63,300,000 35.70%
TOTAL I 177,331,500 177,331,500 100%
Dibulatkan 177,332,000

D HONOR TIM PENGELOLA KEGIATAN ( ≤ 3% x L ) 5,319,000

E GRAND TOTAL ( TOTAL I + TOTAL II) 182,651,000

Batulohe, 05 Januari 2020


Dibuat Oleh:
Disetujui Oleh: Tenaga Perencana Tim Pengelola Kegiatan (TPK)
Kepala Desa Batulohe Infrastruktur Desa

IBNU HAJAR A. WAHYU, S.T. IRMA NINI, S.Pd.

Catatan :