Anda di halaman 1dari 27

LABORATORIUM ILMU UKUR TANAH

JURUSAN SIPIL
FAKULTAS TEKNIK
UNIVERSITAS HASANUDDIN

PENGUKURAN POLYGON DENGAN WATERPASS

FOR UKUR : CROSS SECTION TANGGAL : 17 JULI 2003 HALAMAN :1


DIUKUR OLEH : KELOMPOK XXVII CUACA : CERAH LOKASI : JALAN UNHAS
ALAT / NO :

NO. TITIK TINGGI PEMBACAAN MISTAR JARAK BEDA JARAK TINGGI

BELAKANG MUKA DETAIL


PESAWAT
STASION

TITIK KETERANGAN
PATOK

TINGGI OPTIS
(mm)
ARAH

ATAS ATAS
TENGAH TENGAH
BAWAH BAWAH (m) (m) (m) (mm)
1 2 3 4 5 6 7 8 9 10 11 12
1800
P0 P1 1260 1650 30 -0.39 30 00
1500
1520
a 1477.5 8.5 -0.2175 8.5 89
1435
1615
b 1567.5 9.5 -0.3075 9.5 89
1520
1917.5
c 1868.75 9.75 -0.60875 9.75 89
1820
1600
d 1550 10 -0.29 10 89
1500
1410
1 1385 5 -0.125 5 269
1360
1500
2 1470 6 -0.21 6 269
1440
1872.5
3 1841.25 6.25 -0.58125 6.25 269
1810
1520
4 1487.5 6.5 -0.2275 6.5 269
1455
1127.5
D1 P0 1052.5 15 0.2075 15 00
977.5
1520
P1 1445 15 -0.185 15 180
1370

SKETSA DIPERIKSA

HASMAN
LABORATORIUM ILMU UKUR TANAH
JURUSAN SIPIL
FAKULTAS TEKNIK
UNIVERSITAS HASANUDDIN

PENGUKURAN POLYGON DENGAN WATERPASS

FOR UKUR : CROSS SECTION TANGGAL : 17 JULI 2003 HALAMAN :2


DIUKUR OLEH : KELOMPOK XXVII CUACA : CERAH LOKASI : JALAN UNHAS
ALAT / NO :

NO. TITIK TINGGI PEMBACAAN MISTAR JARAK BEDA JARAK TINGGI

BELAKANG MUKA DETAIL


PESAWAT
STASION

TITIK KETERANGAN
PATOK

TINGGI OPTIS
(mm)
ARAH

ATAS ATAS
TENGAH TENGAH
BAWAH BAWAH (m) (m) (m) (mm)
1 2 3 4 5 6 7 8 9 10 11 12
1025
P1 P0 1280 875 30 0.405 30 00
725
2045
P2 1895 30 -0.615 30 180
1745
1467.5
a 1425 8.5 -0.145 8.5 90
1382.5
1545
b 1497.5 9.5 -0.2175 9.5 90
1450
1947.5
c 1898.75 9.75 -0.61875 9.75 90
1850
1605
d 1555 10 -0.275 10 90
1505
1345
1 1320 5 -0.04 5 270
1295
1620
2 1590 6 -0.31 6 270
1560
1972.5
3 1941.25 6.25 -0.66125 6.25 270
1910
1592.5
4 1560 6.5 -0.28 6.5 270
1527.5
1137.5
D2 P1 1282 1062.5 15 0.2175 15 0
987.5
1755
P2 1680 15 -0.4 15 180
1605

SKETSA DIPERIKSA

HASMAN
LABORATORIUM ILMU UKUR TANAH
JURUSAN SIPIL
FAKULTAS TEKNIK
UNIVERSITAS HASANUDDIN

PENGUKURAN POLYGON DENGAN WATERPASS

FOR UKUR : CROSS SECTION TANGGAL : 17 JULI 2003 HALAMAN :3


DIUKUR OLEH : KELOMPOK XXVII CUACA : CERAH LOKASI : JALAN UNHAS
ALAT / NO :

NO. TITIK TINGGI PEMBACAAN MISTAR JARAK BEDA JARAK TINGGI

BELAKANG MUKA DETAIL


PESAWAT
STASION

TINGGI OPTIS TITIK KETERANGAN


PATOK

(mm)
ARAH

ATAS ATAS
TENGAH TENGAH
BAWAH BAWAH (m) (m) (m) (mm)
1 2 3 4 5 6 7 8 9 10 11 12
800
P2 P1 1286 650 30 0.636 30 00
500
2070
P3 1920 30 -0.634 30 173
1770
1470
a 1430 8 -0.144 8 86.5
1390
1580
b 1535 9 -0.249 9 86.5
1490
1942.5
c 1896.25 9.25 -0.61025 9.25 86.5
1850
1580
d 1532.5 9.5 -0.2465 9.5 86.5
1485
1327.5
1 1300 5.5 -0.014 5.5 266.5
1272.5
1420
2 1390 6 -0.104 6 266.5
1360
1760
3 1728.75 6.25 -0.44275 6.25 266.5
1697.5
1495
4 1462.5 6.5 -0.1765 6.5 266.5
1430
967.5
D3 P2 1290 892.5 15 0.3935 15 00
817.5
1617.5
P3 1542.5 15 -0.2565 15 180
1467.5

SKETSA DIPERIKSA

HASMAN
LABORATORIUM ILMU UKUR TANAH
JURUSAN SIPIL
FAKULTAS TEKNIK
UNIVERSITAS HASANUDDIN

PENGUKURAN POLYGON DENGAN WATERPASS

FOR UKUR : CROSS SECTION TANGGAL : 17 JULI 2003 HALAMAN :4


DIUKUR OLEH : KELOMPOK XXVII CUACA : CERAH LOKASI : JALAN UNHAS
ALAT / NO :

NO. TITIK TINGGI PEMBACAAN MISTAR JARAK BEDA JARAK TINGGI

BELAKANG MUKA DETAIL


PESAWAT
STASION

TINGGI OPTIS TITIK KETERANGAN


PATOK

(mm)
ARAH

ATAS ATAS
TENGAH TENGAH
BAWAH BAWAH (m) (m) (m) (mm)
1 2 3 4 5 6 7 8 9 10 11 12
770
P3 P2 1280 620 30 0.66 30 00
470
1782.5
P4 1632.5 30 -0.3525 30 162
1482.5
1420
a 1377.5 8.5 -0.0975 8.5 81
1335
1575
b 1527.5 9.5 -0.2475 9.5 81
1480
1980
c 1931.25 9.75 -0.65125 9.75 81
1882.5
1575
d 1525 10 -0.245 10 81
1475
1340
1 1312.5 5.5 -0.0325 5.5 261
1285
1452.5
2 1420 6.5 -0.14 6.5 261
1387.5
1787.5
3 1753.75 6.75 -0.47375 6.75 261
1720
1470
4 1435 7 -0.155 7 261
1400
1075
D4 P3 1280.5 1000 15 0.28 15 00
925
1520
P4 1445 15 -0.165 15 180
1370

SKETSA DIPERIKSA

HASMAN
LABORATORIUM ILMU UKUR TANAH
JURUSAN SIPIL
FAKULTAS TEKNIK
UNIVERSITAS HASANUDDIN

PENGUKURAN POLYGON DENGAN WATERPASS

FOR UKUR : CROSS SECTION TANGGAL : 17 JULI 2003 HALAMAN :5


DIUKUR OLEH : KELOMPOK XXVII CUACA : CERAH LOKASI : JALAN UNHAS
ALAT / NO :

NO. TITIK TINGGI PEMBACAAN MISTAR JARAK BEDA JARAK TINGGI

BELAKANG MUKA DETAIL


PESAWAT
STASION

TINGGI OPTIS TITIK KETERANGAN


PATOK

(mm)
ARAH

ATAS ATAS
TENGAH TENGAH
BAWAH BAWAH (m) (m) (m) (mm)
1 2 3 4 5 6 7 8 9 10 11 12
1067.5
P4 P3 1289 917.5 30 0.3715 30 00
767.5
1605
P5 1455 30 -0.166 30 176
1305
1505
a 1465 8 -0.176 8 88
1425
1660
b 1615 9 -0.326 9 88
1570
2022.5
c 1976.25 9.25 -0.68725 9.25 88
1930
1625
d 1577.5 9.5 -0.2885 9.5 88
1530
1350
1 1325 5 -0.036 5 268
1300
1480
2 1450 6 -0.161 6 268
1420
1817.5
3 1786.25 6.25 -0.49725 6.25 268
1755
1480
4 1447.5 6.5 -0.1585 6.5 268
1415
1175
D5 P4 1291 1100 15 0.189 15 00
1025
1525
P5 1450 15 -0.161 15 180
1375

SKETSA DIPERIKSA

HASMAN
LABORATORIUM ILMU UKUR TANAH
JURUSAN SIPIL
FAKULTAS TEKNIK
UNIVERSITAS HASANUDDIN

PENGUKURAN POLYGON DENGAN WATERPASS

FOR UKUR : CROSS SECTION TANGGAL : 17 JULI 2003 HALAMAN :6


DIUKUR OLEH : KELOMPOK XXVII CUACA : CERAH LOKASI : JALAN UNHAS
ALAT / NO :

NO. TITIK TINGGI PEMBACAAN MISTAR JARAK BEDA JARAK TINGGI

BELAKANG MUKA DETAIL


PESAWAT
STASION

TINGGI OPTIS TITIK KETERANGAN


PATOK

(mm)
ARAH

ATAS ATAS
TENGAH TENGAH
BAWAH BAWAH (m) (m) (m) (mm)
1 2 3 4 5 6 7 8 9 10 11 12
1075
P5 P4 1280 925 30 0.355 30 00
775
1900
P6 1750 30 -0.47 30 175.5
1600
1505
a 1465 8 -0.185 8 87.75
1425
1690
b 1645 9 -0.365 9 87.75
1600
2052.5
c 2006.25 9.25 -0.72625 9.25 87.75
1960
1695
d 1647.5 9.5 -0.3675 9.5 87.75
1600
1425
1 1387.5 7.5 -0.1075 7.5 267.75
1350
1570
2 1527.5 8.5 -0.2475 8.5 267.75
1485
1897.5
3 1853.75 8.75 -0.57375 8.75 267.75
1810
1540
4 1495 9 -0.215 9 267.75
1450
1115
D6 P5 1280 1040 15 0.24 15 00
965
1592.5
P6 1517.5 15 -0.2375 15 180
1442.5

SKETSA DIPERIKSA

HASMAN
LABORATORIUM ILMU UKUR TANAH
JURUSAN SIPIL
FAKULTAS TEKNIK
UNIVERSITAS HASANUDDIN

PENGUKURAN POLYGON DENGAN WATERPASS

FOR UKUR : CROSS SECTION TANGGAL : 17 JULI 2003 HALAMAN :7


DIUKUR OLEH : KELOMPOK XXVII CUACA : CERAH LOKASI : JALAN UNHAS
ALAT / NO :

NO. TITIK TINGGI PEMBACAAN MISTAR JARAK BEDA JARAK TINGGI

BELAKANG MUKA DETAIL


PESAWAT
STASION

TINGGI OPTIS TITIK KETERANGAN


PATOK

(mm)
ARAH

ATAS ATAS
TENGAH TENGAH
BAWAH BAWAH (m) (m) (m) (mm)
1 2 3 4 5 6 7 8 9 10 11 12
955
P6 P5 1286 805 30 0.481 30 00
655
1505
a 1462.5 8.5 -0.1765 8.5 90
1420
1625
b 1577.5 9.5 -0.2915 9.5 90
1530
1957.5
c 1908.75 9.75 -0.62275 9.75 90
1860
1645
d 1595 10 -0.309 10 90
1545
1332.5
1 1305 5.5 -0.019 5.5 270
1277.5
1462.5
2 1430 6.5 -0.144 6.5 270
1397.5
1852.5
3 1818.75 6.75 -0.53275 6.75 270
1785
1505
4 1470 7 -0.184 7 270
1435
1592.5
D6 P6 1294 1517.5 15 -0.2315 15 00
1442.5
1120
P5 1045 15 0.241 15 180
970

SKETSA DIPERIKSA

HASMAN
LABORATORIUM ILMU UKUR TANAH
JURUSAN SIPIL
FAKULTAS TEKNIK
UNIVERSITAS HASANUDDIN

PENGUKURAN POLYGON DENGAN WATERPASS

FOR UKUR : CROSS SECTION TANGGAL : 17 JULI 2003 HALAMAN :8


DIUKUR OLEH : KELOMPOK XXVII CUACA : CERAH LOKASI : JALAN UNHAS
ALAT / NO :

NO. TITIK TINGGI PEMBACAAN MISTAR JARAK BEDA JARAK TINGGI

BELAKANG MUKA DETAIL


PESAWAT
STASION

TINGGI OPTIS TITIK KETERANGAN


PATOK

(mm)
ARAH

ATAS ATAS
TENGAH TENGAH
BAWAH BAWAH (m) (m) (m) (mm)
1 2 3 4 5 6 7 8 9 10 11 12
1530
D5 P5 1282 1455 15 -0.173 15 00
1380
1175
P4 1100 15 0.182 15 180
1025

1517.5
D4 P4 1268 1442.5 15 -0.1745 15 00
1367.5
1155
P3 1080 15 0.188 15 180
1005

1612.5
D3 P3 1284 1537.5 15 -0.2535 15 00
1462.5
962.5
P2 887.5 15 0.3965 15 180
812.5

1750
D2 P2 1280 1675 15 -0.395 15 00
1600
1130
P1 1055 15 0.225 15 180
980

1505
D1 P1 1256 1430 15 -0.174 15 00
1355
1110
P0 1035 15 0.221 15 180
960

1592.5
D6 P6 1294 1517.5 15 -0.2315 15 00
1442.5
1120
P5 1045 15 0.241 15 180
970

SKETSA DIPERIKSA

HASMAN
JALAN UNHAS
JALAN UNHAS
JALAN UNHAS
JALAN UNHAS
JALAN UNHAS
JALAN UNHAS
JALAN UNHAS
JALAN UNHAS
Ilmu Ukur Tanah

BAB IV
PENGOLAHAN DATA

IV. 1. Pengolahan Data Waterpass


IV. 1.1. Perhitungan Profil Memanjang
IV. 1.1.1. Perhitungan Jarak Optis Patok Utama

D = (Ba - Bb) x 100

Dimana: D = Jarak Optis (m)


Ba= Benang Atas (m)
Bb= Benang Bawah (m)
IV. 1.1.1.1. Perhitungan Jarak Optis Pergi (D pergi)
D1 = P0 - P1 = ( 1800 - 1500 ) x ### = 30000 mm = 30 m
D2 = P1 - P2 = ( 2045 - 1745 ) x ### = 30000 mm = 30 m
D3 = P2 - P3 = ( 2070 - 1770 ) x ### = 30000 mm = 30 m
D4 = P3 - P4 = ( 1782.5 - 1482.5 ) x ### = 30000 mm = 30 m
D5 = P4 - P5 = ( 1605 - 1305 ) x ### = 30000 mm = 30 m
D6 = P5 - P6 = ( 1900 - 1600 ) x ### = 30000 mm = 30 m
ΣD = ### m
IV. 1.1.1.2. Perhitungan Jarak Optis Pulang (D pergi)
D1 = P1 - P0 = (( 1505 - 1355 ) + ( 1110 - 960 )) x ### = 30 m
D2 = P2 - P1 = (( 1750 - 1600 ) + ( 1130 - 980 )) x ### = 30 m
D3 = P3 - P2 = (( 1612.5 - 1462.5 ) + ( 962.5 - 812.5 )) x ### = 30 m
D4 = P4 - P3 = (( 1517.5 - 1367.5 ) + ( 1155 - 1005 )) x ### = 30 m
D5 = P5 - P4 = (( 1530 - 1380 ) + ( 1175 - 1025 )) x ### = 30 m
D6 = P6 - P5 = (( 1592.5 - 1442.5 ) + ( 1120 - 970 )) x ### = 30 m
ΣD = ### m

IV. 1.1.2. Perhitungan Jarak Optis Rata-Rata Patok Utama

D rata-rata= 1/2 . (Dpergi + Dpulang)

D1 = 1/2 ( 30000 + 30000 ) = 30000 = 30 m


D2 = 1/2 ( 30000 + 30000 ) = 30000 = 30 m
D3 = 1/2 ( 30000 + 30000 ) = 30000 = 30 m
D4 = 1/2 ( 30000 + 30000 ) = 30000 = 30 m
D5 = 1/2 ( 30000 + 30000 ) = 30000 = 30 m
D6 = 1/2 ( 30000 + 30000 ) = 30000 = 30 m
ΣD = ### m
IV. 1.1.3. Perhitungan Beda Tinggi Patok Utama
IV. 1.1.3.1. Perhitungan Beda Tinggi Pergi (ΔH Pergi)

ΔH pergi = Tp - Bt muka

Dimana: ΔH pergi = Beda tinggi (m)


Tp = Tinggi Pesawat (m)
Btm = Benang Tengah Muka (m)

P0 - P1 ΔH = 1260 - 1650 = -390 mm = -0.390 m


P1 - P2 ΔH = 1280 - 1895 = -615 mm = -0.615 m
P2 - P3 ΔH = 1286 - 1920 = -634 mm = -0.634 m
P3 - P4 ΔH = 1280 - 1632.5 = -352.5 mm = -0.353 m
P4 - P5 ΔH = 1289 - 1455 = -166 mm = -0.166 m
P5 - P6 ΔH = 1280 - 1750 = -470 mm = -0.470 m
ΔH = -2627.5 mm = -2.6275 m

Kelompok XXVII (Servin P. / D 111 00 100)


Ilmu Ukur Tanah

IV. 1.1.3.2. Perhitungan Beda Tinggi Pulang (ΔH Pulang)

ΔH pulang = Btb - Btm

Dimana: ΔH pulang = Beda tinggi (m)


Btm = Benang Tengah Muka (m)
Btb = Benang Tengah Belakang(m)

P0 - P1 ΔH = 1430 - 1035 = 395.0 mm = 0.395 m


P1 - P2 ΔH = 1675 - 1055 = 620.0 mm = 0.620 m
P2 - P3 ΔH = 1537.5 - 887.5 = 650.0 mm = 0.650 m
P3 - P4 ΔH = 1442.5 - 1080 = 362.5 mm = 0.363 m
P4 - P5 ΔH = 1455 - 1100 = 355.0 mm = 0.355 m
P5 - P6 ΔH = 1517.5 - 1045 = 472.5 mm = 0.473 m
ΔH = 2628.0 mm = 2.628 m

IV. 1.1.4. Perhitungan Beda Tinggi Rata-Rata Patok Utama

ΔH rata-rata = 1/2 . (ΔHpergi - ΔHpulang)

ΔH1 = 1/2 x ( -390 - 395 ) = -392.50 mm = -0.393 m


ΔH2 = 1/2 x ( -615 - 620 ) = -617.50 mm = -0.618 m
ΔH3 = 1/2 x ( -634 - 650 ) = -642.00 mm = -0.642 m
ΔH4 = 1/2 x ( -352.5 - 362.5 ) = -357.50 mm = -0.358 m
ΔH5 = 1/2 x ( -166 - 355 ) = -260.50 mm = -0.261 m
ΔH6 = 1/2 x ( -470 - 472.5 ) = -471.25 mm = -0.471 m
ΔH = -2741.3 mm = -2.7413 m

IV. 1.1.5. Perhitungan Koreksi


IV. 1.1.5.1. Kesalahan (K)

K = ΣΔH pergi + ΣΔHpulang

K = -2627.5 + 2628.0 = 0.500

IV. 1.1.5.2. Toleransi Kesalahan (T)

T =10 √ D
D = Jarak Optis Rata-Rata Dalam (Km)
D = 30 m = 0.03 Km

T= 10 √ 0.03 = 1.73205 m

IV. 1.1.5.3. Koreksi Beda Tinggi (K)

D
K= x Koreksi total
∑D
30
K= x 0.5 = 0.08333 m
180

Kelompok XXVII (Servin P. / D 111 00 100)


Ilmu Ukur Tanah

IV. 1.1.6. Perhitungan Tinggi Titik Patok Utama

H n-1 = Hn ± H (n-1)-n - Kr

Dimana: Hn = Tinggi titik patok utama ke-n (m)


Hn-1 = Tinggi titik patok sebelum ke-n (m)
Kr = Koreksi perpatok

Peil P0 = 4.57 m

P1 : H1 = 4.57 + -0.393 - 0.08333 = 4.094 m


P2 : H2 = 4.094 + -0.618 - 0.08333 = 3.393 m
P3 : H3 = 3.393 + -0.642 - 0.08333 = 2.668 m
P4 : H4 = 2.668 + -0.358 - 0.08333 = 2.227 m
P5 : H5 = 2.227 + -0.261 - 0.08333 = 1.883 m
P6 : H6 = 1.883 + -0.471 - 0.08333 = 1.329 m

IV. 1.1.7. Perhitungan Persentase Kemiringan Patok Utama

Hn - Hn-1
Rumus: Q= x ### %
D

Dimana: Q = Prosentase kemiringan (%)


Hn = Tinggi patok ke-n (m)
Hn-1 = Tinggi patok sebelum ke-n (m)
D = Jarak optis

4.094 - 4.570
P0 - P1 : Q= x ### % = -1.5861 %
30

3.393 - 4.094
P1 - P2 : Q= x ### % = -2.3361 %
30

2.668 - 3.393
P2 - P3 : Q= x ### % = -2.4178 %
30

2.227 - 2.668
P3 - P4 : Q= x ### % = -1.4694 %
30

1.883 - 2.227
P4 - P5 : Q= x ### % = -1.1461 %
30

1.329 - 1.883
P5 - P6 : Q= x ### % = -1.8486 %
30

Kelompok XXVII (Servin P. / D 111 00 100)


Ilmu Ukur Tanah

IV. 1.2. Perhitungan Profil Melintang


IV. 1.2.1. Perhitungan Jarak Optis Detail
Untuk Patok P0
a= ( 1520 - 1435 ) x ### = 8500 mm = 8.5 m
b= ( 1615 - 1520 ) x ### = 9500 mm = 9.5 m
c = ( 1917.5 - 1820 ) x ### = 9750 mm = 9.75 m
d= ( 1600 - 1500 ) x ### = 10000 mm = 10 m
1= ( 1410 - 1360 ) x ### = 5000 mm = 5 m
2= ( 1500 - 1440 ) x ### = 6000 mm = 6 m
3 = ( 1872.5 - 1810 ) x ### = 6250 mm = 6.25 m
4= ( 1520 - 1455 ) x ### = 6500 mm = 6.5 m

Untuk Patok P1
a = ( 1467.5 - 1382.5 ) x ### = 8500 mm = 8.5 m
b= ( 1545 - 1450 ) x ### = 9500 mm = 9.5 m
c = ( 1947.5 - 1850 ) x ### = 9750 mm = 9.75 m
d= ( 1605 - 1505 ) x ### = 10000 mm = 10 m
1= ( 1345 - 1295 ) x ### = 5000 mm = 5 m
2= ( 1620 - 1560 ) x ### = 6000 mm = 6 m
3 = ( 1972.5 - 1910 ) x ### = 6250 mm = 6.25 m
4 = ( 1592.5 - 1527.5 ) x ### = 6500 mm = 6.5 m

Untuk Patok P2
a= ( 1470 - 1390 ) x ### = 8000 mm = 8 m
b= ( 1580 - 1490 ) x ### = 9000 mm = 9 m
c = ( 1942.5 - 1850 ) x ### = 9250 mm = 9.25 m
d= ( 1580 - 1485 ) x ### = 9500 mm = 9.5 m
1 = ( 1327.5 - 1272.5 ) x ### = 5500 mm = 5.5 m
2= ( 1420 - 1360 ) x ### = 6000 mm = 6 m
3= ( 1760 - 1697.5 ) x ### = 6250 mm = 6.25 m
4= ( 1495 - 1430 ) x ### = 6500 mm = 6.5 m

Untuk Patok P3
a= ( 1420 - 1335 ) x ### = 8500 mm = 8.5 m
b= ( 1575 - 1480 ) x ### = 9500 mm = 9.5 m
c= ( 1980 - 1882.5 ) x ### = 9750 mm = 9.75 m
d= ( 1575 - 1475 ) x ### = 10000 mm = 10 m
1= ( 1340 - 1285 ) x ### = 5500 mm = 5.5 m
2 = ( 1452.5 - 1387.5 ) x ### = 6500 mm = 6.5 m
3 = ( 1787.5 - 1720 ) x ### = 6750 mm = 6.75 m
4= ( 1470 - 1400 ) x ### = 7000 mm = 7 m

Untuk Patok P4
a= ( 1505 - 1425 ) x ### = 8000 mm = 8 m
b= ( 1660 - 1570 ) x ### = 9000 mm = 9 m
c = ( 2022.5 - 1930 ) x ### = 9250 mm = 9.25 m
d= ( 1625 - 1530 ) x ### = 9500 mm = 9.5 m
1= ( 1350 - 1300 ) x ### = 5000 mm = 5 m
2= ( 1480 - 1420 ) x ### = 6000 mm = 6 m
3 = ( 1817.5 - 1755 ) x ### = 6250 mm = 6.25 m
4= ( 1480 - 1415 ) x ### = 6500 mm = 6.5 m

Untuk Patok P5
a= ( 1505 - 1425 ) x ### = 8000 mm = 8 m
b= ( 1690 - 1600 ) x ### = 9000 mm = 9 m
c = ( 2052.5 - 1960 ) x ### = 9250 mm = 9.25 m
d= ( 1695 - 1600 ) x ### = 9500 mm = 9.5 m
1= ( 1425 - 1350 ) x ### = 7500 mm = 7.5 m

Kelompok XXVII (Servin P. / D 111 00 100)


Ilmu Ukur Tanah

2= ( 1570 - 1485 ) x ### = 8500 mm = 8.5 m


3= ( 1897.5 - 1810 ) x ### = 8750 mm = 8.75 m
4= ( 1540 - 1450 ) x ### = 9000 mm = 9 m

Untuk Patok P6
a= ( 1505 - 1420 ) x ### = 8500 mm = 8.5 m
b= ( 1625 - 1530 ) x ### = 9500 mm = 9.5 m
c = ( 1957.5 - 1860 ) x ### = 9750 mm = 9.75 m
d= ( 1645 - 1545 ) x ### = 10000 mm = 10 m
1 = ( 1332.5 - 1277.5 ) x ### = 5500 mm = 5.5 m
2 = ( 1462.5 - 1397.5 ) x ### = 6500 mm = 6.5 m
3 = ( 1852.5 - 1785 ) x ### = 6750 mm = 6.75 m
4= ( 1505 - 1435 ) x ### = 7000 mm = 7 m

IV. 1.2.2. Perhitungan Beda Tinggi Detail

ΔHd = Tp - Btd

ΔHd = Beda tinggi terhadap detail


Tp = Tinggi pesawat
Btd = Benang tengah detail

Detail
a = 1260 - 1477.5 = -217.5 mm = -0.2175 m
b = 1260 - 1567.5 = -307.5 mm = -0.3075 m
c = 1260 - 1868.75 = -608.75 mm = -0.6088 m
d = 1260 - 1550 = -290 mm = -0.29 m
P0
1 = 1260 - 1385 = -125 mm = -0.125 m
2 = 1260 - 1470 = -210 mm = -0.21 m
3 = 1260 - 1841.25 = -581.25 mm = -0.5813 m
4 = 1260 - 1487.5 = -227.5 mm = -0.2275 m

Detail
a = 1280 - 1425 = -145 mm = -0.145 m
b = 1280 - 1497.5 = -217.5 mm = -0.2175 m
c = 1280 - 1898.75 = -618.75 mm = -0.6188 m
d = 1280 - 1555 = -275 mm = -0.275 m
P1
1 = 1280 - 1320 = -40 mm = -0.04 m
2 = 1280 - 1590 = -310 mm = -0.31 m
3 = 1280 - 1941.25 = -661.25 mm = -0.6613 m
4 = 1280 - 1560 = -280 mm = -0.28 m

Detail
a = 1286 - 1430 = -144 mm = -0.144 m
b = 1286 - 1535 = -249 mm = -0.249 m
c = 1286 - 1896.25 = -610.25 mm = -0.6103 m
d = 1286 - 1532.5 = -246.5 mm = -0.2465 m
P2
1 = 1286 - 1300 = -14 mm = -0.014 m
2 = 1286 - 1390 = -104 mm = -0.104 m
3 = 1286 - 1728.75 = -442.75 mm = -0.4428 m
4 = 1286 - 1462.5 = -176.5 mm = -0.1765 m

Detail
a = 1280 - 1377.5 = -97.5 mm = -0.0975 m
b = 1280 - 1527.5 = -247.5 mm = -0.2475 m
c = 1280 - 1931.25 = -651.25 mm = -0.6513 m
d = 1280 - 1525 = -245 mm = -0.245 m
P3
1 = 1280 - 1312.5 = -32.5 mm = -0.0325 m

Kelompok XXVII (Servin P. / D 111 00 100)


Ilmu Ukur Tanah

2 = 1280 - 1420 = -140 mm = -0.14 m


3 = 1280 - 1753.75 = -473.75 mm = -0.4738 m
4 = 1280 - 1435 = -155 mm = -0.155 m

Detail
a = 1289 - 1465 = -176 mm = -0.176 m
b = 1289 - 1615 = -326 mm = -0.326 m
c = 1289 - 1976.25 = -687.25 mm = -0.6873 m
d = 1289 - 1577.5 = -288.5 mm = -0.2885 m
P4
1 = 1289 - 1325 = -36 mm = -0.036 m
2 = 1289 - 1450 = -161 mm = -0.161 m
3 = 1289 - 1786.25 = -497.25 mm = -0.4973 m
4 = 1289 - 1447.5 = -158.5 mm = -0.1585 m

Detail
a = 1280 - 1465 = -185 mm = -0.185 m
b = 1280 - 1645 = -365 mm = -0.365 m
c = 1280 - 2006.25 = -726.25 mm = -0.7263 m
d = 1280 - 1647.5 = -367.5 mm = -0.3675 m
P5
1 = 1280 - 1387.5 = -107.5 mm = -0.1075 m
2 = 1280 - 1527.5 = -247.5 mm = -0.2475 m
3 = 1280 - 1853.75 = -573.75 mm = -0.5738 m
4 = 1280 - 1495 = -215 mm = -0.215 m

Detail
a = 1286 - 1462.5 = -176.5 mm = -0.1765 m
b = 1286 - 1577.5 = -291.5 mm = -0.2915 m
c = 1286 - 1908.75 = -622.75 mm = -0.6228 m
d = 1286 - 1595 = -309 mm = -0.309 m
P6
1 = 1286 - 1305 = -19 mm = -0.019 m
2 = 1286 - 1430 = -144 mm = -0.144 m
3 = 1286 - 1818.75 = -532.75 mm = -0.5328 m
4 = 1286 - 1470 = -184 mm = -0.184 m

IV. 1.2.3. Perhitungan Tinggi Detail

Rumus: Hd = Hn + Hdt

Dimana: Hd = Tinggi titik detail


Hn = Tinggi titik patok utama
Hdt = Beda tinggi detail

P0 = H0 = 4.57 m

P0- a = 4.57 + -0.2175 = 4.3525 m


b = 4.57 + -0.3075 = 4.2625 m
c = 4.57 + -0.6088 = 3.96125 m
d = 4.57 + -0.29 = 4.28 m
1 = 4.57 + -0.125 = 4.445 m
2 = 4.57 + -0.21 = 4.36 m
3 = 4.57 + -0.5813 = 3.98875 m
4 = 4.57 + -0.2275 = 4.3425 m

P1 = H1 = 4.09417 m

P1- a = 4.09417 + -0.145 = 3.94917 m


b = 4.09417 + -0.2175 = 3.87667 m

Kelompok XXVII (Servin P. / D 111 00 100)


Ilmu Ukur Tanah

c = 4.09417 + -0.6188 = 3.47542 m


d = 4.09417 + -0.275 = 3.81917 m
1 = 4.09417 + -0.04 = 4.05417 m
2 = 4.09417 + -0.31 = 3.78417 m
3 = 4.09417 + -0.6613 = 3.43292 m
4 = 4.09417 + -0.28 = 3.81417 m

P2 = H2 = 3.39333 m

P2- a = 3.39333 + -0.144 = 3.24933 m


b = 3.39333 + -0.249 = 3.14433 m
c = 3.39333 + -0.6103 = 2.78308 m
d = 3.39333 + -0.2465 = 3.14683 m
1 = 3.39333 + -0.014 = 3.37933 m
2 = 3.39333 + -0.104 = 3.28933 m
3 = 3.39333 + -0.4428 = 2.95058 m
4 = 3.39333 + -0.1765 = 3.21683 m

P3 = H3 = 2.668 m

P3- a = 2.668 + -0.0975 = 2.5705 m


b = 2.668 + -0.2475 = 2.4205 m
c = 2.668 + -0.6513 = 2.01675 m
d = 2.668 + -0.245 = 2.423 m
1 = 2.668 + -0.0325 = 2.6355 m
2 = 2.668 + -0.14 = 2.528 m
3 = 2.668 + -0.4738 = 2.19425 m
4 = 2.668 + -0.155 = 2.513 m

P4 = H4 = 2.22717 m

P4- a = 2.22717 + -0.176 = 2.05117 m


b = 2.22717 + -0.326 = 1.90117 m
c = 2.22717 + -0.6873 = 1.53992 m
d = 2.22717 + -0.2885 = 1.93867 m
1 = 2.22717 + -0.036 = 2.19117 m
2 = 2.22717 + -0.161 = 2.06617 m
3 = 2.22717 + -0.4973 = 1.72992 m
4 = 2.22717 + -0.1585 = 2.06867 m

P5 = H5 = 1.88333 m

P5- a = 1.88333 + -0.185 = 1.69833 m


b = 1.88333 + -0.365 = 1.51833 m
c = 1.88333 + -0.7263 = 1.15708 m
d = 1.88333 + -0.3675 = 1.51583 m
1 = 1.88333 + -0.1075 = 1.77583 m
2 = 1.88333 + -0.2475 = 1.63583 m
3 = 1.88333 + -0.5738 = 1.30958 m
4 = 1.88333 + -0.215 = 1.66833 m

P6 = H6 = 1.32875 m

P6- a = 1.32875 + -0.1765 = 1.15225 m


b = 1.32875 + -0.2915 = 1.03725 m
c = 1.32875 + -0.6228 = 0.706 m
d = 1.32875 + -0.309 = 1.01975 m
1 = 1.32875 + -0.019 = 1.30975 m

Kelompok XXVII (Servin P. / D 111 00 100)


Ilmu Ukur Tanah

2 = 1.32875 + -0.144 = 1.18475 m


3 = 1.32875 + -0.5328 = 0.796 m
4 = 1.32875 + -0.184 = 1.14475 m

IV. 1.2.4. Perhitungan Kemiringan Profil Melintang

( Hn - Hm )
Rumus: Km-n = x ### %
D

Km-n = Prosentase kemiringan detail m dan n


Hn = Tinggi detail n
Hm = Tinggi detail m
D = Jarak ukur (m)

4.3525 - 4.57
P0 : K Po-a = x 100 % = -0.0026 %
8.5

4.2625 - 4.3525
K a-b = x 100 % = -9 %
1

3.96125 - 4.2625
K b-c = x 100 % = -120.5 %
0.25

4.28 - 3.96125
K c-d = x 100 % = 127.5 %
0.25

4.445 - 4.57
K Po-1 = x 100 % = -2.5 %
5

4.36 - 4.445
K 1-2 = x 100 % = -8.5 %
1

3.98875 - 4.36
K 2-3 = x 100 % = -148.5 %
0.25

4.3425 - 3.98875
K 3-4 = x 100 % = 141.5 %
0.25

3.94917 - 4.09417
P1 : K P1-a = x 100 % = -0.0017 %
8.5

3.87667 - 3.94917
K a-b = x 100 % = -7.25 %
1

3.47542 - 3.87667
K b-c = x 100 % = -160.5 %
0.25

3.81917 - 3.47542
K c-d = x 100 % = 137.5 %
0.25

4.05417 - 4.09417
K P1-1 = x 100 % = -0.8 %
5

3.78417 - 4.05417
K 1-2 = x 100 % = -27 %
1

Kelompok XXVII (Servin P. / D 111 00 100)


Ilmu Ukur Tanah

3.43292 - 3.78417
K 2-3 = x 100 % = -140.5 %
0.25

3.81417 - 3.43292
K 3-4 = x 100 % = 152.5 %
0.25

3.24933 - 3.39333
P2 : K P2-a = x 100 % = -0.0018 %
8

3.14433 - 3.24933
K a-b = x 100 % = -10.5 %
1

2.78308 - 3.14433
K b-c = x 100 % = -144.5 %
0.25

3.14683 - 2.78308
K c-d = x 100 % = 145.5 %
0.25

3.37933 - 3.39333
K P2-1 = x 100 % = -0.2545 %
5.5

3.28933 - 3.37933
K 1-2 = x 100 % = -18 %
0.5

2.95058 - 3.28933
K 2-3 = x 100 % = -135.5 %
0.25

3.21683 - 2.95058
K 3-4 = x 100 % = 106.5 %
0.25

2.5705 - 2.668
P3 : K P3-a = x 100 % = -0.0011 %
8.5

2.4205 - 2.5705
K a-b = x 100 % = -15 %
1

2.01675 - 2.4205
K b-c = x 100 % = -161.5 %
0.25

2.423 - 2.01675
K c-d = x 100 % = 162.5 %
0.25

2.6355 - 2.668
K P3-1 = x 100 % = -0.5909 %
5.5

2.528 - 2.6355
K 1-2 = x 100 % = -10.75 %
1

2.19425 - 2.528
K 2-3 = x 100 % = -133.5 %
0.25

2.513 - 2.19425
K 3-4 = x 100 % = 127.5 %
0.25

Kelompok XXVII (Servin P. / D 111 00 100)


Ilmu Ukur Tanah

2.05117 - 2.22717
P4 : K P4-a = x 100 % = -0.0022 %
8

1.90117 - 2.05117
K a-b = x 100 % = -15 %
1

1.53992 - 1.90117
K b-c = x 100 % = -144.5 %
0.25

1.93867 - 1.53992
K c-d = x 100 % = 159.5 %
0.25

2.19117 - 2.22717
K P4-1 = x 100 % = -0.72 %
5

2.06617 - 2.19117
K 1-2 = x 100 % = -12.5 %
1

1.72992 - 2.06617
K 2-3 = x 100 % = -134.5 %
0.25

2.06867 - 1.72992
K 3-4 = x 100 % = 135.5 %
0.25

1.69833 - 1.88333
P5 : K P5-a = x 100 % = -0.0023 %
8

1.51833 - 1.69833
K a-b = x 100 % = -18 %
1

1.15708 - 1.51833
K b-c = x 100 % = -144.5 %
0.25

1.51583 - 1.15708
K c-d = x 100 % = 143.5 %
0.25

1.77583 - 1.88333
K P5-1 = x 100 % = -1.4333 %
7.5

1.63583 - 1.77583
K 1-2 = x 100 % = -14 %
1

1.30958 - 1.63583
K 2-3 = x 100 % = -130.5 %
0.25

1.66833 - 1.30958
K 3-4 = x 100 % = 143.5 %
0.25

1.15225 - 1.32875
P6 : K P6-a = x 100 % = -0.0021 %
8.5

1.03725 - 1.15225
K a-b = x 100 % = -11.5 %
1

0.706 - 1.03725
K b-c = x 100 % = -132.5 %
0.25

Kelompok XXVII (Servin P. / D 111 00 100)


Ilmu Ukur Tanah

1.01975 - 0.706
K c-d = x 100 % = 125.5 %
0.25

1.30975 - 1.32875
K P6-1 = x 100 % = -0.3455 %
5.5

1.18475 - 1.30975
K 1-2 = x 100 % = -12.5 %
1

0.796 - 1.18475
K 2-3 = x 100 % = -155.5 %
0.25

1.14475 - 0.796
K 3-4 = x 100 % = 139.5 %
0.25

Kelompok XXVII (Servin P. / D 111 00 100)

Anda mungkin juga menyukai