REKAPITULASI BILL OF QUANTITY (BOQ)

PEKERJAAN : PENYELESAIAN PEMBANGUNAN RKB SMPN 3 BANDA ACEH


LOKASI : KOTA BANDA ACEH
TAHUN ANGGARA : 2018

NO URAIAN PEKERJAAN JUMLAH HARGA

A PEKERJAAN PERSIAPAN 3,600,000.00


SUB. JUMLAH A 3,600,000.00
B PEMBANGUNAN GEDUNG LANTAI - I
I PEKERJAAN TANAH DAN LANTAI 51,322,896.92
II PEK. PASANGAN KUSEN PINTU DAN JENDELA 25,201,169.96
III PEKERJAAN PENGECATAN 21,585,417.94
IV PEKERJAAN LAIAN - LAIN 23,473,000
SUB. JUMLAH - B 121,582,484.82
C PEMBANGUNAN GEDUNG LANTAI - II
I PEKERJAAN LANTAI 37,835,910.08
II PEK. PASANGAN KUSEN PINTU DAN JENDELA 22,085,463.74
III PEKERJAAN PENGECATAN 22,968,017.21
IV PEKERJAAN LAIAN - LAIN 18,343,500.00
SUB. JUMLAH - C 101,232,891.03
D PEMBANGUNAN GEDUNG LANTAI - III
I PEKERJAAN LANTAI 37,835,910.08
II PEK. PASANGAN KUSEN PINTU DAN JENDELA 22,085,463.74
III PEKERJAAN PENGECATAN 24,858,285.21
IV PEKERJAAN LAIN - LAIN 15,506,500.00
SUB. JUMLAH - D 100,286,159.02

JUMLAH (A + B + C + D) 326,701,534.87
PPN 10 % 32,670,153.49
JUMLAH TOTAL 359,371,688.36
DIBULATKAN 359,300,000.00
Terbilang : Tiga Ratus Lima Puluh Sembilan Juta Tiga Ratus Ribu Rupiah

Banda Aceh, 8 Juni 2018


Penyedia Jasa,
CV. GLOBAL KENCANA

IRWANSYAH
Direktur
BILL OF QUANTITY (BOQ)
PEKERJAAN : PENYELESAIAN PEMBANGUNAN RKB SMPN 3 BANDA ACEH
LOKASI : KOTA BANDA ACEH
TAHUN ANGGARA : 2018

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN
1 Administrasi 1.00 Unit Taksir 1,500,000.00 1,500,000.00
2 Papan Nama Proyek 1.00 Unit Taksir 300,000.00 300,000.00
3 Skapolding Perancah ( sewa) 1.00 Ls Taksir 1,800,000.00 1,800,000.00
Sub Jumlah 3,600,000.00
B PEMBANGUNAN GEDUNG LANTAI - I
I PEKERJAAN TANAH DAN LANTAI
a. Lantai Ruangan Elv. 0 + 0.00
1 Lantai Keramik 40 x 40 cm' pholised 168.00 m2 A.4.4.3.34 197,342.75 33,153,582.00
2 Bonbon Keramik 2.60 m2 Taksir 19,000.00 49,400.00
b. Lantai Selasar Elv. 0 - 0.03
1 Lantai Keramik 40 x 40 cm' Unpholised 42.00 m2 A.4.4.3.34a 195,445.80 8,208,723.60
2 Bonbon Keramik 18.90 m2 Taksir 19,000.00 359,100.00
c. Lantai Tangga Lt 1, 2.,3
1 Lantai Keramik 40 x 40 cm' Unpholised 25.38 A.4.4.3.34a 195,445.80 4,960,414.40
2 Bonbon Keramik 53.68 Taksir 19,000.00 1,019,920.00
d Lantai Ram dan tangga
1 Lantai Keramik 40 x 40 cm' Unpholised 17.40 A.4.4.3.34a 195,445.80 3,400,756.92
2 Bonbon Keramik 9.00 Taksir 19,000.00 171,000.00
Sub Jumlah 51,322,896.92
II PEK. PASANGAN KUSEN PINTU DAN JENDELA
1 Pintu Type P1 = 2 Unit
- Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua 2.00 Unit Taksir 1,100,000.00 2,200,000.00
- Anak Jalusi Ventilasi 6.92 m2 A.4.6.1.10 522,769.50 3,617,564.94
- Kunci Tanam 2.00 Bh A.4.6.2.2 180,075.50 360,151.00
- Engsel Pintu 6.00 bh A.4.6.2.5 55,231.83 331,390.95
- Pegangan Pintu Stainless 2.00 bh Taksir 150,000.00 300,000.00
- Sloot Double Pintu 2.00 bh A.4.6.2.8 61,377.80 122,755.60
2 Jendela Type J1 = 10 Unit
- Daun Jendela 30.00 bh Taksir 250,000.00 7,500,000.00
- Anak Jalusi Ventilasi 7.20 m2 A.4.6.1.10 522,769.50 3,763,940.40
- Kaca 5 mm Bening 9.79 m2 A.4.6.2.17 164,131.83 1,606,850.57
- Engsel Jendela 60.00 bh A.4.6.2.6 38,654.55 2,319,273.00
- Hak Angin Jendela 60.00 bh A.4.6.2.9 33,231.83 1,993,909.50
- Pacok Jendela 30.00 bh A.4.6.2.8a 26,177.80 785,334.00
- Tarikan Jendela 30.00 bh Taksir 10,000.00 300,000.00
Sub Jumlah 25,201,169.96
III PEKERJAAN PENGECATAN
1 Cat Tembok (L/D) 468.97 m2 A.4.7.1.10 28,176.06 13,213,726.86
2 Cat Langi-langit Beton Ruangan dan selasar 215.40 m2 A.4.7.1.10 28,176.06 6,069,123.32
3 Cat kusen Pintu dan Jendela 29.87 m2 A.4.7.1.4 40,746.20 1,217,088.99
4 Cat Daun Pintu Dan Jendela 10.32 m2 A.4.7.1.4 40,746.20 420,500.78
5 Cat Jalusi 16.32 m2 A.4.7.1.4 40,746.20 664,977.98
Sub Jumlah 21,585,417.94
IV PEKERJAAN LAIAN - LAIN
1 Besi Pagar reling Ramm 11.10 m2 Taksir 600,000.00 6,660,000.00
2 Pemasangan Tarlis Hollow Pengaman tangga 7.18 m2 Taksir 350,000.00 2,513,000.00
3 Pemasangan Pintu Pengaman tangga 200 x 100 cm 1.00 Unit Taksir 1,500,000.00 1,500,000.00
4 Pemasangan Batu alam pada Tiang Depan 8.00 Unit Taksir 1,600,000.00 12,800,000.00
Sub Jumlah 23,473,000.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6 7
C PEMBANGUNAN GEDUNG LANTAI - II

I PEKERJAAN LANTAI
a. Lantai Ruangan Elv. 0 + 4.00
1 Lantai Keramik 40 x 40 cm' pholised 153.00 m2 A.4.4.3.34 197,342.75 30,193,440.75
2 Bonbon Keramik 2.60 m2 Taksir 19,000.00 49,400.00
b. Lantai Selasar Elv. 0 - 3.95
1 Lantai Keramik 40 x 40 cm' Unpholised 38.85 m2 A.4.4.3.34a 195,445.80 7,593,069.33
Sub Jumlah 37,835,910.08
II PEK. PASANGAN KUSEN PINTU DAN JENDELA
1 Pintu Type P1 = 2 Unit
- Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua 2.00 Unit Taksir 1,100,000.00 2,200,000.00
- Anak Jalusi Ventilasi 0.96 m2 A.4.6.1.10 522,769.50 501,858.72
- Kunci Tanam 2.00 Bh A.4.6.2.2 180,075.50 360,151.00
- Engsel Pintu 6.00 bh A.4.6.2.5 55,231.83 331,390.95
- Pegangan Pintu Stainless 2.00 bh Taksir 150,000.00 300,000.00
- Sloot Double Pintu 2.00 bh A.4.6.2.8 61,377.80 122,755.60
2 Jendela Type J1 = 10 Unit
- Daun Jendela 30.00 bh Taksir 250,000.00 7,500,000.00
- Anak Jalusi Ventilasi 7.20 m2 A.4.6.1.10 522,769.50 3,763,940.40
- Kaca 5 mm Bening 9.79 m2 A.4.6.2.17 164,131.83 1,606,850.57
- Engsel Jendela 60.00 bh A.4.6.2.6 38,654.55 2,319,273.00
- Hak Angin Jendela 60.00 bh A.4.6.2.9 33,231.83 1,993,909.50
- Pacok Jendela 30.00 bh A.4.6.2.8a 26,177.80 785,334.00
- Tarikan Jendela 30.00 bh Taksir 10,000.00 300,000.00
Sub Jumlah 22,085,463.74
III PEKERJAAN PENGECATAN
1 Cat Tembok (L/D) 518.04 m2 A.4.7.1.10 28,176.06 14,596,326.12
2 Cat Langi-langit Beton Ruangan dan selasar 215.40 m2 A.4.7.1.10 28,176.06 6,069,123.32
3 Cat kusen Pintu dan Jendela 29.87 m2 A.4.7.1.4 40,746.20 1,217,088.99
4 Cat Daun Pintu Dan Jendela 10.32 m2 A.4.7.1.4 40,746.20 420,500.78
5 Cat Jalusi 16.32 m2 A.4.7.1.4 40,746.20 664,977.98
Sub Jumlah 22,968,017.21
IV PEKERJAAN LAIAN - LAIN
1 Pemasangan Tarlis Pengaman 52.41 m2 Taksir 350,000.00 18,343,500.00
Sub Jumlah 18,343,500.00
D PEMBANGUNAN GEDUNG LANTAI - III
I PEKERJAAN LANTAI
a. Lantai Ruangan Elv. + 7.80
1 Lantai Keramik 40 x 40 cm' pholised 153.00 m2 A.4.4.3.34 197,342.75 30,193,440.75
2 Bonbon Keramik 2.60 m2 Taksir 19,000.00 49,400.00
b. Lantai Selasar Elv. + 7.77
1 Lantai Keramik 40 x 40 cm' Unpholised 38.85 m2 A.4.4.3.34a 195,445.80 7,593,069.33
Sub Jumlah 37,835,910.08
II PEK. PASANGAN KUSEN PINTU DAN JENDELA
1 Pintu Type P1 = 2 Unit
- Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua 2.00 Unit Taksir 1,100,000.00 2,200,000.00
- Anak Jalusi Ventilasi 0.96 m2 A.4.6.1.10 522,769.50 501,858.72
- Kunci Tanam 2.00 Bh A.4.6.2.2 180,075.50 360,151.00
- Engsel Pintu 6.00 bh A.4.6.2.5 55,231.83 331,390.95
- Pegangan Pintu Stainless 2.00 bh Taksir 150,000.00 300,000.00
- Sloot Double Pintu 2.00 bh A.4.6.2.8 61,377.80 122,755.60
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6 7
2 Jendela Type J1 = 10 Unit
- Daun Jendela 30.00 bh Taksir 250,000.00 7,500,000.00
- Anak Jalusi Ventilasi 7.20 m2 A.4.6.1.10 522,769.50 3,763,940.40
- Kaca 5 mm Bening 9.79 m2 A.4.6.2.17 164,131.83 1,606,850.57
- Engsel Jendela 60.00 bh A.4.6.2.6 38,654.55 2,319,273.00
- Hak Angin Jendela 60.00 bh A.4.6.2.9 33,231.83 1,993,909.50
- Pacok Jendela 30.00 bh A.4.6.2.8a 26,177.80 785,334.00
- Tarikan Jendela 30.00 bh Taksir 10,000.00 300,000.00
Sub Jumlah 22,085,463.74
III PEKERJAAN PENGECATAN
Cat Tembok (L/D) 567.52 m2 A.4.7.1.10 28,176.06 15,990,477.57
Cat Plafond Plywood dan List Plafond 288.34 m2 A.4.7.1.12 22,176.99 6,394,513.30
1 Cat kusen Pintu dan Jendela 31.54 m2 A.4.7.1.4 40,746.20 1,285,135.15
2 Cat Daun Pintu Dan Jendela 10.32 m2 A.4.7.1.4 40,746.20 420,500.78
3 Cat Jalusi 18.84 m2 A.4.7.1.4 40,746.20 767,658.41
Sub Jumlah 24,858,285.21
IV PEKERJAAN LAIN - LAIN
1 Pemasangan Tarlis Pengaman 40.59 m2 Taksir 350,000.00 14,206,500.00
2 Perbaiki atap seng yang bocor 1.00 Ls Taksir 800,000.00 800,000.00
3 Pembersihan Akhir 1.00 paket Taksir 500,000.00 500,000.00
Sub Jumlah 15,506,500.00

Banda Aceh, 8 Juni 2018


Penyedia Jasa,
CV. GLOBAL KENCANA

IRWANSYAH
Direktur
BACK UP DATA

PENYELESAIAN PEMBANGUNAN RKB SMPN 3 BANDA ACEH


KOTA BANDA ACEH

Uraian Pekerjaan Hitungan Volume Referensi


1 2 3

A PEKERJAAN PERSIAPAN PEKERJAAN PERSIAPAN

Volume = 1.00 Ls
1 Administrasi Administrasi
Volume = 1.00 Ls
2 Papan Nama Proyek Papan Nama Proyek
Volume = 1.00 Ls
3 Skapolding Perancah ( sewa) Skapolding Perancah ( sewa)
Volume = 1.00 Ls
4 Biaya Menaikan matrial ke lt 2 & 3 Biaya Menaikan matrial ke lt 2 & 3
Volume = 1.00 Ls
B PEMBANGUNAN GEDUNG LANTAI - I
PEKERJAAN TANAH DAN LANTAI
a. Lantai Ruangan Elv. 0 + 0.00
1 Lantai Keramik 40 x 40 cm' pholised Lantai Keramik 40 x 40 cm' pholised
Luas 168.00
Volume = 168.00 m2
2 Bonbon Keramik Bonbon Keramik
Panjang 1.30 x 2
Volume = 2.60 m2
b. Lantai Selasar Elv. 0 - 0.03
1 Lantai Keramik 40 x 40 cm' Unpholise Lantai Keramik 40 x 40 cm' Unpholised
Luas 42.00
Volume = 42.00 m2
2 Bonbon Keramik Bonbon Keramik
Panjang 2.70 x 7
Volume = 18.90 m2
c Lantai Tangga Lt 1, 2, 3
1 Keramik Lantai 40 x 40 cm Unpholised Keramik Lantai 40 x 40 cm Unpholised
Jumlah Panjang Total
- As D 4.00 x 5.20 20.80
Jlh 20.80
Panjang = 20.80 m'
Lebar = 1.22 m'
Volume = 20.80 x 1.22
= 25.38 m2
2 Pas. Bonbon Keramik tangga Pas. Bonbon Keramik tangga
Panjang = 1.22 m'
Buah = 44.00 m'
Volume = 1.22 x 44.00
= 53.68 m

d Raam dan tangga


1 Keramik Lantai 40 x 40 cm Unpholised Keramik Lantai 40 x 40 cm Unpholised
Panjang Lebar Total
- Raam 8.20 x 1.50 12.30
- Tangga 1.70 x 3.00 5.10
Jlh 17.40
= 17.40 m2
2 Pas. Bonbon Keramik tangga Pas. Bonbon Keramik tangga
Panjang x Lebar Total
- Tangga 3.00 x 3.00 9.00
Jlh 9.00
= 9.00 m

VI PEK. PASANGAN KUSEN PINTU DAN JENDELA


1 Pintu Type P1 = 2 Unit
- Daun Pintu Panel Ukuran 120 x 210 Luas = 1.32 x 2.62
- Anak Jalusi Ventilasi = 3.46 x 2.00 Unit
- Kunci Tanam = 6.92 m2
- Engsel Pintu Pjg. Kosen = 1.32 + 1.32 + 2.62 + 2.62 + 0.40
- Pegangan Pintu Stainless = 8.28 x 2.00 Unit
- Sloot Double Pintu = 16.56 m'

5
Uraian Pekerjaan Hitungan Volume Referensi
1 2 3
Luas Jalusi = 0.40 x 0.60 x 2.00
= 0.48 x 2.00 Unit
= 0.96 m2
2 Jendela Type J1 = 10 Unit Pintu Type P1 = 2 Unit
- Daun Jendela = 2.84 x 10.00 Unit
- Anak Jalusi Ventilasi = 28.36 m2
- Kaca 5 mm Bening Pjg. Kosen = 2.04 + 4.08 + 1.39 + 2.78
- Engsel Jendela = 10.29 x 10.00 Unit
- Hak Angin Jendela = 102.90 m'
- Pacok Jendela Luas Jalusi = 0.40 x 0.60 x 3.00
- Tarikan Jendela = 0.72 x 10.00 Unit
= 7.20 m2
Luas Kaca = 0.48 x 0.68 x 3.00
= 0.98 x 10.00 Unit
= 9.79 m2

IX PEKERJAAN PENGECATAN
1 Cat Tembok (L/D) Cat Tembok (L/D)
Volume = Vol Plasteran + Vol Acian
= 468.97
= 468.97 m2
2 Cat Langi-langit Beton Ruangan dan seCat Langi-langit Beton Ruangan dan selasar
Volume = Flafond
= 215.40
= 215.40 m2
3 Cat kusen Pintu dan Jendela Cat kusen Pintu dan Jendela
Panjang = 119.46 m'
Lebar = 0.25 m'
Volume = 119.46 x 0.25
= 29.87 m2

4 Cat Daun Pintu Dan Jendela Cat Daun Pintu Dan Jendela
Luas = 5.16 m2
L/D = 2.00 sisi
Volume = 5.16 x 2.00
= 10.32 m2
5 Cat Jalusi Cat Jalusi
Luas = 8.16 m2
L/D = 2.00 sisi
Volume = 8.16 x 2.00
= 16.32 m2

IV PEKERJAAN LAIN - LAIN

1 Besi Pagar Realling Tangga (bentuk se Besi Pagar Realling Tangga (bentuk sesuai gambar)
Panjang Lebar Total
- Realling 5.10 + 6.00 11.10
Jlh 11.10
= 11.10 m

2 Pemasangan Tarlis Hollow Pengaman tangga


Panjang Lebar Total
2.70 X 3.40 9.18

= 9.18 - 2.00

= 7.18 M2

3 Pemasangan Pintu Hollow Pengaman tangga = 1.00 UNIT

4 Pemasangan Batu alam pada Tiang Depan = 8.00 UNIT

6
BACK UP DATA

PENYELESAIAN PEMBANGUNAN RKB SMPN 3 BANDA ACEH


KOTA BANDA ACEH

Uraian Pekerjaan Hitungan Volume Referensi


1 2 3

C PEMBANGUNAN GEDUNG LANTAI - II

I PEKERJAAN LANTAI
a. Lantai Ruangan Elv. 0 + 4.00
1 Lantai Keramik 40 x 40 cm' pholised Lantai Keramik 40 x 40 cm' pholised
Panjang = 18.00 m' 3.00 m'
Lebar = 8.00 m' 3.00 m'
Luas 144.00 9.00
Volume = 144.00 + 9.00
= 153.00 m2
2 Bonbon Keramik Bonbon Keramik
Panjang 1.30 x 2
Volume = 2.60 m
b. Lantai Selasar Elv. 0 - 3.95
1 Lantai Keramik 40 x 40 cm' Unpholise Lantai Keramik 40 x 40 cm' Unpholised
Panjang = 21.00 m' - m'
Lebar = 1.85 m' - m'
Luas 38.85 -
Volume = 38.85 + -
= 38.85 m2

II PEK. PASANGAN KUSEN PINTU DAN JENDELA


1 Pintu Type P1 = 2 Unit Pintu Type P1 = 2 Unit
- Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua = 3.46 x 2.00 Unit
- Anak Jalusi Ventilasi = 6.92 m2
- Kunci Tanam Pjg. Kosen = 1.32 + 1.32 + 2.62 + 2.62 + 0.40
- Engsel Pintu = 8.28 x 2.00 Unit
- Pegangan Pintu Stainless = 16.56 m'
- Sloot Double Pintu Luas Jalusi = 0.40 x 0.60 x 2.00
= 0.48 x 2.00 Unit
= 0.96 m2
2 Jendela Type J1 = 10 Unit Pintu Type P1 = 2 Unit
- Daun Jendela = 2.84 x 10.00 Unit
- Anak Jalusi Ventilasi = 28.36 m2
- Kaca 5 mm Bening Pjg. Kosen = 2.04 + 4.08 + 1.39 + 2.78
- Engsel Jendela = 10.29 x 10.00 Unit
- Hak Angin Jendela = 102.90 m'
- Pacok Jendela Luas Jalusi = 0.40 x 0.60 x 3.00
- Tarikan Jendela = 0.72 x 10.00 Unit
= 7.20 m2
Luas Kaca = 0.48 x 0.68 x 3.00
= 0.98 x 10.00 Unit
= 9.79 m2

III PEKERJAAN PENGECATAN


1 Cat Tembok (L/D) Cat Tembok (L/D)
Volume = Vol Plasteran + Vol Acian
= 518.04
= 518.04 m2
2 Cat Langi-langit Beton Ruangan dan seCat Langi-langit Beton Ruangan dan selasar
Volume = Flafond
= 215.40
= 215.40 m2
3 Cat kusen Pintu dan Jendela Cat kusen Pintu dan Jendela
Panjang = 119.46 m'
Lebar = 0.25 m'
Volume = 119.46 x 0.25
= 29.87 m2
4 Cat Daun Pintu Dan Jendela Cat Daun Pintu Dan Jendela
Luas = 5.16 m2
L/D = 2.00 sisi
Volume = 5.16 x 2.00
= 10.32 m2

7
Uraian Pekerjaan Hitungan Volume Referensi
1 2 3
5 Cat Jalusi Cat Jalusi
Luas = 8.16 m2
52.41 L/D = 2.00 sisi
Volume = 8.16 x 2.00
= 16.32 m2

IV PEKERJAAN LAIN - LAIN

1 Besi Teralis Pengaman


Panjang Lebar Jumlah Volume
= 2.35 x 2.70 x 7.00 = 44.42

= 2.35 x 1.70 x 2.00 = 7.99


52.41 m2

8
BACK UP DATA

PENYELESAIAN PEMBANGUNAN RKB SMPN 3 BANDA ACEH


KOTA BANDA ACEH

Uraian Pekerjaan Hitungan Volume Referensi


1 2 3
D PEMBANGUNAN GEDUNG LANTAI - III

I PEKERJAAN LANTAI
a. Lantai Ruangan Elv. + 7.80
1 Lantai Keramik 40 x 40 cm' pholised Lantai Keramik 40 x 40 cm' pholised
Panjang = 18.00 m' 3.00 m'
Lebar = 8.00 m' 3.00 m'
Luas 144.00 9.00
Volume = 144.00 + 9.00
= 153.00 m2
2 Bonbon Keramik Bonbon Keramik
Panjang 1.30 x 2
Volume = 2.60 m
b. Lantai Selasar Elv. + 7.77
1 Lantai Keramik 40 x 40 cm' Unpholise Lantai Keramik 40 x 40 cm' Unpholised
Panjang = 21.00 m' - m'
Lebar = 1.85 m' - m'
Luas 38.85 -
Volume = 38.85 + -
= 38.85 m2
II PEK. PASANGAN KUSEN PINTU DAN JENDELA
1 Pintu Type P1 = 2 Unit Pintu Type P1 = 2 Unit
- Kusen Luas = 1.32 x 2.62
- Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua = 3.4584 x 2 Unit
- Anak Jalusi Ventilasi = 6.9168 m2
- Kunci Tanam Pjg. Kosen = 1.32 + 1.32 + 2.62 + 2.62 + 0.4
- Engsel Pintu = 8.28 x 2 Unit
- Pegangan Pintu Stainless = 16.56 m'
- Sloot Double Pintu Luas Jalusi = 0.4 x 0.6 x 2.00
= 0.48 x 2 Unit
= 0.96 m2
2 Jendela Type J1 = 10 Unit Pintu Type P1 = 2 Unit
- Kusen Luas = 2.04 x 1.39
- Daun Jendela = 2.8356 x 10 Unit
- Anak Jalusi Ventilasi = 28.356 m2
- Kaca 5 mm Bening Pjg. Kosen = 2.04 + 4.08 + 1.39 + 2.78
- Engsel Jendela = 10.29 x 10 Unit
- Hak Angin Jendela = 102.9 m'
- Pacok Jendela Luas Jalusi = 0.4 x 0.6 x 3.00
- Tarikan Jendela = 0.72 x 10 Unit
= 7.2 m2
Luas Kaca = 0.48 x 0.68 x 3.00
= 0.9792 x 10 Unit
= 9.792 m2

III PEKERJAAN PENGECATAN


1 Cat Tembok (L/D) Cat Tembok (L/D)
Volume Vol=Plasteran + Vol Acian
= 567.5164
= 567.5164 m2

2 Cat Plafond Plywood dan List Plafond


Cat Plafond Plywood dan List Plafond
Volume = Flafond
= 288.337
= 288.337 m2

3 Cat kusen Pintu dan Jendela Cat kusen Pintu dan Jendela
Panjang = 126.14 m'
Lebar = 0.25 m'
Volume = 126.14 x 0.25
= 31.535 m2
4 Cat Daun Pintu Dan Jendela Cat Daun Pintu Dan Jendela

9
Uraian Pekerjaan Hitungan Volume Referensi
1 2 3
Luas = 5.16 m2
L/D = 2 sisi
Volume = 5.16 x 2
= 10.32 m2
5 Cat Jalusi Cat Jalusi
Luas = 9.42 m2
L/D = 2 sisi
Volume = 9.42 x 2
= 18.84 m2

6 Cat Listplank kayu Cat Listplank kayu


Panjang = 118.18 m'
Lebar = 0.25 m'
Volume = 118.18 x 0.25
= 29.545 m2

IX PEKERJAAN LAIN - LAIN

1 Pemasangan Tarlis Pengaman

Panjang Lebar Jumlah Volume


= 1.82 x 2.70 x 7.00 = 34.40

= 1.82 x 1.70 x 2.00 = 6.19


40.59 m2

2 Perbaiki atap seng yang bocor Volume = 1.00 Ls

3 Pembersihan Akhir Pembersihan Akhir


Volume = 1.00 Paket

10
ANALISA HARGA SATUAN
A. A.2.3.1 PEKERJAAN TANAH

A.2.3.1.2
1 m3 Galian tanah biasa sedalam 2 meter A.2.3.1.2
0.900 OH Pekerja Rp 78,000.00 Rp 70,200.00
A. TENAGA
0.045 OH Mandor Rp 81,000.00 Rp 3,645.00

B. BAHAN

C. PERALATA

D. JUMLAH (A+B+C) Rp 73,845.00


E. OVER HEAD & PROFI 10% 10% x D Rp 7,384.50
F. HARGA SATUAN PEKERJAAN (D+E) Rp 81,229.50

A.2.3.1.4
1 m3 Galian tanah keras sedalam 1 meter A.2.3.1.4
1.000 OH Pekerja Rp 78,000.00 Rp 78,000.00
A. TENAGA
0.032 OH Mandor Rp 81,000.00 Rp 2,592.00

B. BAHAN

C. PERALATA

D. JUMLAH (A+B+C) Rp 80,592.00


E. OVER HEAD & PROFI 10% 10% x D Rp 8,059.20
F. HARGA SATUAN PEKERJAAN (D+E) Rp 88,651.20

A.2.3.1.9
1 m3 Urugan Tanah Kembali A.2.3.1.9
0.500 OH Pekerja Rp 78,000.00 Rp 39,000.00
A. TENAGA
0.050 OH Mandor Rp 81,000.00 Rp 4,050.00

B. BAHAN

C. PERALATA

D. JUMLAH (A+B+C) Rp 43,050.00


E. OVER HEAD & PROFI 10% 10% x D Rp 4,305.00
F. HARGA SATUAN PEKERJAAN (D+E) Rp 47,355.00

A.2.3.1.11
1 m3 Urugan pasir A.2.3.1.11
0.300 OH Pekerja Rp 78,000.00 Rp 23,400.00
A. TENAGA
0.010 OH Mandor Rp 81,000.00 Rp 810.00
1.200 m3 Pasir urug Rp 100,000.00 Rp 120,000.00
B. BAHAN

C. PERALATA

D. JUMLAH (A+B+C) Rp 144,210.00


E. OVER HEAD & PROFI 10% 10% x D Rp 14,421.00
F. HARGA SATUAN PEKERJAAN (D+E) Rp 158,631.00
A.2.3.1.14.a
1 m3 Urugan Tanah A.2.3.1.14.a
0.250 OH Pekerja Rp 78,000.00 Rp 19,500.00
A. TENAGA
0.025 OH Mandor Rp 81,000.00 Rp 2,025.00
1.200 m3 Tanah urug Rp 55,000.00 Rp 66,000.00
B. BAHAN

C. PERALATA

D. JUMLAH (A+B+C) Rp 87,525.00


E. OVER HEAD & PROFI 10% 10% x D Rp 8,752.50
F. HARGA SATUAN PEKERJAAN (D+E) Rp 96,277.50

`
H A.4.6.1 PEKERJAAN KAYU
A.4.6.1.1
1 m3 Membuat dan memasang kusen pintu/jendela kayu Klass I A.4.6.1.1
7.000 OH Pekerja Rp 78,000.00 Rp 546,000.00
21.000 OH Tukang Kayu Rp 83,000.00 Rp 1,743,000.00
A. TENAGA
2.100 OH Kepala Tukang Rp 102,000.00 Rp 214,200.00
0.350 OH Mandor Rp 81,000.00 Rp 28,350.00
1.100 m3 Kayu Klas I Rp - Rp -
B. BAHAN 1.250 Kg Paku biasa 2" - 5" Rp 15,000.00 Rp 18,750.00
1.000 Kg Lem kayu Rp 18,000.00 Rp 18,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 2,568,300.00


E. OVER HEAD & PROFI 10% 10% xD Rp 256,830.00
F. HARGA SATUAN PEKERJAAN (D+E) Rp 2,825,130.00
`
A.4.6.1.2
1 m3 Membuat dan memasang kusen pintu/jendela kayu Klas II A.4.6.1.2
6.000 OH Pekerja Rp 78,000.00 Rp 468,000.00
18.000 OH Tukang Kayu Rp 83,000.00 Rp 1,494,000.00
A. TENAGA
1.800 OH Kepala Tukang Rp 102,000.00 Rp 183,600.00
0.300 OH Mandor Rp 81,000.00 Rp 24,300.00
1.200 m3 Kayu Klass II Rp 4,000,000.00 Rp 4,800,000.00
B. BAHAN 1.250 Kg Paku biasa 2" - 5" Rp 15,000.00 Rp 18,750.00
1.000 Kg Lem kayu Rp 18,000.00 Rp 18,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 7,006,650.00


E. OVER HEAD & PROFI 10% 10% x D Rp 700,665.00
F. HARGA SATUAN PEKERJAAN (D+E) Rp 7,707,315.00
A.4.6.1.10
1 m2 Memasang jalusi kusen kayu Klas I & II A.4.6.1.10
0.670 OH Pekerja Rp 78,000.00 Rp 52,260.00
2.400 OH Tukang Kayu Rp 83,000.00 Rp 199,200.00
A. TENAGA
0.200 OH Kepala Tukang Rp 102,000.00 Rp 20,400.00
0.335 OH Mandor Rp 81,000.00 Rp 27,135.00
0.060 m3 Kayu kamper, papan Rp 2,900,000.00 Rp 174,000.00
B. BAHAN
0.150 Kg Paku kecil Rp 15,000.00 Rp 2,250.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 475,245.00


E. OVER HEAD & PROFI 10% 10% x D Rp 47,524.50
F. HARGA SATUAN PEKERJAAN (D+E) Rp 522,769.50

A.4.6.1.13
1 m3 Memasang Kobstruksi Kuda kuda konvensional, kayu Klas I, II & III A.4.6.1.13
4.000 OH Pekerja Rp 78,000.00 Rp 312,000.00
12.000 OH Tukang Kayu Rp 83,000.00 Rp 996,000.00
A. TENAGA
1.200 OH Kepala Tukang Rp 102,000.00 Rp 122,400.00
0.200 OH Mandor Rp 81,000.00 Rp 16,200.00
1.100 m3 Kayu Klas II Rp 4,000,000.00 Rp 4,400,000.00
B. BAHAN 15.000 Kg Besi Plat Strip Rp 20,000.00 Rp 300,000.00
5.600 Kg Paku 12 cm Rp 15,000.00 Rp 84,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 6,230,600.00


E. OVER HEAD & PROFI 10% 10% x D Rp 623,060.00
F. HARGA SATUAN PEKERJAAN (D+E) Rp 6,853,660.00

A.4.6.1.15
1 m3 Memasang Gordeng Klas II A.4.6.1.15
4.000 OH Pekerja Rp 78,000.00 Rp 312,000.00
12.000 OH Tukang Kayu Rp 83,000.00 Rp 996,000.00
A. TENAGA
1.200 OH Kepala Tukang Rp 102,000.00 Rp 122,400.00
0.200 OH Mandor Rp 81,000.00 Rp 16,200.00
1.100 m3 Kayu Klas II Rp 4,000,000.00 Rp 4,400,000.00
B. BAHAN
3.000 Kg Paku 12 cm Rp 15,000.00 Rp 45,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 5,891,600.00


E. OVER HEAD & PROFI 10% 10% x D Rp 589,160.00
F. HARGA SATUAN PEKERJAAN (D+E) Rp 6,480,760.00

A.4.6.1.19
1 m2 Memasang rangka langit-langi kayu Klas II & III A.4.6.1.19
0.150 OH Pekerja Rp 78,000.00 Rp 11,700.00
0.300 OH Tukang Kayu Rp 83,000.00 Rp 24,900.00
A. TENAGA
0.030 OH Kepala Tukang Rp 102,000.00 Rp 3,060.00
0.010 OH Mandor Rp 81,000.00 Rp 810.00
0.012 m3 Kaso-kaso 5/7 Rp 4,000,000.00 Rp 48,000.00
B. BAHAN
0.200 Kg Paku 7-10 cm Rp 15,000.00 Rp 3,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 91,470.00


E. OVER HEAD & PROFI 10% 10% x D Rp 9,147.00
F. HARGA SATUAN PEKERJAAN (D+E) Rp 100,617.00
A.4.6.1.21
1 m1 Memasang Lisplank uk. (2.5x25) cm kayu Klas I & II A.4.6.1.21
0.100 OH Pekerja Rp 78,000.00 Rp 7,800.00
0.200 OH Tukang Kayu Rp 83,000.00 Rp 16,600.00
A. TENAGA
0.020 OH Kepala Tukang Rp 102,000.00 Rp 2,040.00
0.005 OH Mandor Rp 81,000.00 Rp 405.00
0.0108 m3 Kayu papan Klas II Rp 4,000,000.00 Rp 43,200.00
B. BAHAN
0.100 Kg Paku biasa 2" - 5" Rp 15,000.00 Rp 1,500.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 71,545.00


E. OVER HEAD & PROFI 10% 10% x D Rp 7,154.50
F. HARGA SATUAN PEKERJAAN (D+E) Rp 78,699.50

I PEKERJAAN LANGIT - LANGIT


A.4.5.1.1
1 m2 Memasang langit-langit asbes semen, tebal 4 mm, 5mm, 6 mm A.4.5.1.1
0.030 OH Pekerja Rp 78,000.00 Rp 2,340.00
0.070 OH Tukang Kayu Rp 83,000.00 Rp 5,810.00
A. TENAGA
0.007 OH Kepala Tukang Rp 102,000.00 Rp 714.00
0.004 OH Mandor Rp 81,000.00 Rp 324.00
1.1000 lbr Asbes semen Rp 6,000.00 Rp 6,600.00
B. BAHAN
0.0100 kg Paku kecil Rp 15,000.00 Rp 150.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 15,938.00


E. OVER HEAD & PROFI 10% 10% x D Rp 1,593.80
F. HARGA SATUAN PEKERJAAN (D+E) Rp 17,531.80

A.4.5.1.5
1 m2 Memasang langit-langit tripleks uk. (120 x 240) cm, tebal 4 mm A.4.5.1.5
0.100 OH Pekerja Rp 78,000.00 Rp 7,800.00
0.100 OH Tukang Kayu Rp 83,000.00 Rp 8,300.00
A. TENAGA
0.010 OH Kepala Tukang Rp 102,000.00 Rp 1,020.00
0.005 OH Mandor Rp 81,000.00 Rp 405.00
0.3750 lbr Tripleks Rp 69,000.00 Rp 25,875.00
B. BAHAN
0.0300 kg Paku kecil Rp 15,000.00 Rp 450.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 43,850.00


E. OVER HEAD & PROFI 10% 10% x D Rp 4,385.00
F. HARGA SATUAN PEKERJAAN (D+E) Rp 48,235.00

A.4.5.1.7
1 m2 Memasang langit-langit gypsum board, uk. (1200 x 2400 x 9) mm A.4.5.1.7
0.100 OH Pekerja Rp 78,000.00 Rp 7,800.00
0.050 OH Tukang Kayu Rp 83,000.00 Rp 4,150.00
A. TENAGA
0.005 OH Kepala Tukang Rp 102,000.00 Rp 510.00
0.005 OH Mandor Rp 81,000.00 Rp 405.00
0.3640 lbr Gypsum board Rp 115,000.00 Rp 41,860.00
B. BAHAN
0.1100 kg Paku sekrup Rp 90,000.00 Rp 9,900.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 64,625.00


E. OVER HEAD & PROFI 10% 10% x D Rp 6,462.50
F. HARGA SATUAN PEKERJAAN (D+E) Rp 71,087.50
A.4.5.1.9
1 m1 Memasang list gypsum profil A.4.5.1.9
0.050 OH Pekerja Rp 78,000.00 Rp 3,900.00
0.050 OH Tukang Kayu Rp 83,000.00 Rp 4,150.00
A. TENAGA
0.005 OH Kepala Tukang Rp 102,000.00 Rp 510.00
0.003 OH Mandor Rp 81,000.00 Rp 243.00
1.0500 m' List gypsum profil Rp 6,000.00 Rp 6,300.00
B. BAHAN
0.0100 kg Paku sekrup Rp 90,000.00 Rp 900.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 16,003.00


E. OVER HEAD & PROFI 10% 10% x D Rp 1,600.30
F. HARGA SATUAN PEKERJAAN (D+E) Rp 17,603.30

J A.4.4.3 PEKERJAAN LANTAI


A.4.4.3.34
1 m2 Memasang lantai keramik uk.( 40 x 40 cm') A.4.4.3.34
0.700 OH Pekerja Rp 78,000.00 Rp 54,600.00
0.350 OH Tukang batu Rp 83,000.00 Rp 29,050.00
A. TENAGA
0.035 OH Kepala Tukang Rp 102,000.00 Rp 3,570.00
0.030 OH Mandor Rp 81,000.00 Rp 2,430.00
6.560 bh Ubin keramik 40 x 40 cm' Rp 9,900.00 Rp 64,944.00
8.190 kg PC Rp 1,350.00 Rp 11,056.50
B. BAHAN
0.045 m3 Pasir pasang Rp 140,000.00 Rp 6,300.00
1.620 kg Semen warna Rp 4,600.00 Rp 7,452.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 179,402.50


E. OVER HEAD & PROFI 10% 10% x D Rp 17,940.25
F. HARGA SATUAN PEKERJAAN (D+E) Rp 197,342.75

A.4.4.3.34a
1 m2 Memasang lantai keramik uk.( 40 x 40 cm') Anti Slip A.4.4.3.34a
0.620 OH Pekerja Rp 78,000.00 Rp 48,360.00
0.350 OH Tukang batu Rp 83,000.00 Rp 29,050.00
A. TENAGA
0.035 OH Kepala Tukang Rp 102,000.00 Rp 3,570.00
0.030 OH Mandor Rp 81,000.00 Rp 2,430.00
6.560 bh Ubin keramik 40 x 40 cm' Rp 10,300.00 Rp 67,568.00
10.000 kg PC Rp 1,350.00 Rp 13,500.00
B. BAHAN
0.045 m3 Pasir pasang Rp 140,000.00 Rp 6,300.00
1.500 kg Semen warna Rp 4,600.00 Rp 6,900.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 177,678.00


E. OVER HEAD & PROFI 10% 10% x D Rp 17,767.80
F. HARGA SATUAN PEKERJAAN (D+E) Rp 195,445.80
A.4.4.3.35
1 m2 Memasang lantai keramik uk.(30x30) cm A.4.4.3.35
0.700 OH Pekerja Rp 78,000.00 Rp 54,600.00
0.350 OH Tukang batu Rp 83,000.00 Rp 29,050.00
A. TENAGA
0.035 OH Kepala Tukang Rp 102,000.00 Rp 3,570.00
0.030 OH Mandor Rp 81,000.00 Rp 2,430.00
11.670 bh Ubin keramik 30x30 Rp 6,000.00 Rp 70,020.00
10.000 kg PC Rp 1,350.00 Rp 13,500.00
B. BAHAN
0.045 m3 Pasir pasang Rp 140,000.00 Rp 6,300.00
1.500 kg Semen warna Rp 4,600.00 Rp 6,900.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 186,370.00


E. OVER HEAD & PROFI 10% 10% x D Rp 18,637.00
F. HARGA SATUAN PEKERJAAN (D+E) Rp 205,007.00

A.4.4.3.35a
1 m2 Memasang lantai keramik uk.(30x30) cm anti slip A.4.4.3.35a
0.700 OH Pekerja Rp 83,000.00 Rp 58,100.00
0.350 OH Tukang batu Rp 102,000.00 Rp 35,700.00
A. TENAGA
0.035 OH Kepala Tukang Rp 81,000.00 Rp 2,835.00
0.030 OH Mandor Rp 81,000.00 Rp 2,430.00
11.670 bh Ubin keramik 30x30 anti slip Rp 5,500.00 Rp 64,185.00
10.000 kg PC Rp 1,350.00 Rp 13,500.00
B. BAHAN
0.045 m3 Pasir pasang Rp 140,000.00 Rp 6,300.00
1.500 kg Semen warna Rp 4,600.00 Rp 6,900.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 189,950.00


E. OVER HEAD & PROFI 10% 10% x D Rp 18,995.00
F. HARGA SATUAN PEKERJAAN (D+E) Rp 208,945.00

A.4.4.3.19
1 m1 Memasang plint keramik uk.(10x20) cm A.4.4.3.19
0.090 OH Pekerja Rp 83,000.00 Rp 7,470.00
0.090 OH Tukang batu Rp 102,000.00 Rp 9,180.00
A. TENAGA
0.009 OH Kepala Tukang Rp 81,000.00 Rp 729.00
0.005 OH Mandor Rp 81,000.00 Rp 405.00
5.3000 bh Plint keramik Rp 450.00 Rp 2,385.00
1.1400 kg PC Rp 1,350.00 Rp 1,539.00
B. BAHAN
0.0030 m3 Pasir pasang Rp 140,000.00 Rp 420.00
0.1000 kg Semen warna Rp 4,600.00 Rp 460.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 22,588.00


E. OVER HEAD & PROFI 10% 10% x D Rp 2,258.80
F. HARGA SATUAN PEKERJAAN (D+E) Rp 24,846.80
A.4.4.3.50
1 m2 Memasang dinding keramik uk.(20x20) cm A.4.4.3.50
0.090 OH Pekerja Rp 78,000.00 Rp 7,020.00
0.450 OH Tukang batu Rp 83,000.00 Rp 37,350.00
A. TENAGA
0.045 OH Kepala Tukang Rp 102,000.00 Rp 4,590.00
0.045 OH Mandor Rp 81,000.00 Rp 3,645.00
26.5000 bh Keramik dinding 20x20 Rp 2,800.00 Rp 74,200.00
9.3000 kg PC Rp 1,350.00 Rp 12,555.00
B. BAHAN
0.0180 m3 Pasir pasang Rp 140,000.00 Rp 2,520.00
1.9400 kg Semen warna Rp 4,600.00 Rp 8,924.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 150,804.00


E. OVER HEAD & PROFI 10% 10% x D Rp 15,080.40
F. HARGA SATUAN PEKERJAAN (D+E) Rp 165,884.40

A.4.4.3.51
1 m2 Memasang dinding keramik uk.(20x25) cm A.4.4.3.51
0.090 OH Pekerja Rp 78,000.00 Rp 7,020.00
0.450 OH Tukang batu Rp 83,000.00 Rp 37,350.00
A. TENAGA
0.045 OH Kepala Tukang Rp 102,000.00 Rp 4,590.00
0.045 OH Mandor Rp 81,000.00 Rp 3,645.00
21.2000 bh Keramik dinding 20x25 Rp 3,800.00 Rp 80,560.00
9.3000 kg PC Rp 1,350.00 Rp 12,555.00
B. BAHAN
0.0180 m3 Pasir pasang Rp 140,000.00 Rp 2,520.00
1.5520 kg Semen warna Rp 4,600.00 Rp 7,139.20

C. PERALATA

D. JUMLAH (A+B+C) Rp 155,379.20


E. OVER HEAD & PROFI 10% 10% x D Rp 15,537.92
F. HARGA SATUAN PEKERJAAN (D+E) Rp 170,917.12

A.4.4.3.58
1 m2 Memasang dinding batu tempel/batu alam A.4.4.3.58
0.700 OH Pekerja Rp 78,000.00 Rp 54,600.00
0.350 OH Tukang batu Rp 83,000.00 Rp 29,050.00
A. TENAGA
0.035 OH Kepala Tukang Rp 102,000.00 Rp 3,570.00
0.035 OH Mandor Rp 81,000.00 Rp 2,835.00
1.1000 m2 Batu alam polos/motif Rp 180,000.00 Rp 198,000.00
B. BAHAN 11.7500 kg PC Rp 1,350.00 Rp 15,862.50
0.0350 m3 Pasir pasang Rp 140,000.00 Rp 4,900.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 308,817.50


E. OVER HEAD & PROFI 10% 10% x D Rp 30,881.75
F. HARGA SATUAN PEKERJAAN (D+E) Rp 339,699.25
A.4.4.3.87
1 m2 Memasang paving block A.4.4.3.87
0.250 OH Pekerja Rp 78,000.00 Rp 19,500.00
0.500 OH Tukang batu Rp 83,000.00 Rp 41,500.00
A. TENAGA
0.025 OH Kepala Tukang Rp 102,000.00 Rp 2,550.00
0.003 OH Mandor Rp 81,000.00 Rp 243.00
1.0100 m2 paving block Rp 87,000.00 Rp 87,870.00
B. BAHAN
0.1000 m3 Pasir urug Rp 100,000.00 Rp 10,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 161,663.00


E. OVER HEAD & PROFI 10% 10% x D Rp 16,166.30
F. HARGA SATUAN PEKERJAAN (D+E) Rp 177,829.30

J PEKERJAAN PEMBESIAN DAN ALMUNIUM

A.5.2.1.21
1 m2 Rangka besi hollow 1 x 40 x 0.2 mm, modul 60 x 60 cm plafon A.5.2.1.21
0.350 OH Pekerja Rp 78,000.00 Rp 27,300.00
0.035 OH Tukang las biasa Rp 83,000.00 Rp 2,905.00
A. TENAGA
0.035 OH Kepala Tukang Rp 102,000.00 Rp 3,570.00
0.0180 OH Mandor Rp 81,000.00 Rp 1,458.00
4.0000 m' Besi siku L 30.30.3 Rp 14,000.00 Rp 56,000.00
B. BAHAN

1.000 Ls Peralatan Las Rp 25,000.00 Rp 25,000.00


C. PERALATA

D. JUMLAH (A+B+C) Rp 116,233.00


E. OVER HEAD & PROFI 10% 10% x D Rp 11,623.30
F. HARGA SATUAN PEKERJAAN (D+E) Rp 127,856.30

L A.4.6.2 PEKERJAAN PENGGANTUNG & PENGUNCI


A.4.6.2.2
1 buah Pasang kunci tanam biasa (besar) A.4.6.2.2
0.010 OH Pekerja Rp 78,000.00 Rp 780.00
0.500 OH Tukang kayu Rp 83,000.00 Rp 41,500.00
A. TENAGA
0.010 OH Kepala Tukang Rp 102,000.00 Rp 1,020.00
0.005 OH Mandor Rp 81,000.00 Rp 405.00
B. BAHAN 1.0000 bh Kunci tanam besar Rp 120,000.00 Rp 120,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 163,705.00


E. OVER HEAD & PROFI 10% 10% x D Rp 16,370.50
F. HARGA SATUAN PEKERJAAN (D+E) Rp 180,075.50
A.4.6.2.3
1 buah Pasang kunci tanam biasa (kecil) A.4.6.2.3
0.005 OH Pekerja Rp 78,000.00 Rp 390.00
0.500 OH Tukang kayu Rp 83,000.00 Rp 41,500.00
A. TENAGA
0.050 OH Kepala Tukang Rp 102,000.00 Rp 5,100.00
0.003 OH Mandor Rp 81,000.00 Rp 243.00
B. BAHAN 1.0000 bh Kunci tanam kecil Rp 120,000.00 Rp 120,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 167,233.00


E. OVER HEAD & PROFI 10% 10% x D Rp 16,723.30
F. HARGA SATUAN PEKERJAAN (D+E) Rp 183,956.30

A.4.6.2.4
1 buah Pasang kunci silinder A.4.6.2.4
0.005 OH Pekerja Rp 78,000.00 Rp 390.00
0.500 OH Tukang kayu Rp 83,000.00 Rp 41,500.00
A. TENAGA
0.005 OH Kepala Tukang Rp 102,000.00 Rp 510.00
0.0030 OH Mandor Rp 81,000.00 Rp 243.00
B. BAHAN 1.0000 bh Kunci silinder Rp 150,000.00 Rp 150,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 192,643.00


E. OVER HEAD & PROFI 10% 10% x D Rp 19,264.30
F. HARGA SATUAN PEKERJAAN (D+E) Rp 211,907.30

A.4.6.2.5
1 buah Pasang engsel pintu A.4.6.2.5
0.015 OH Pekerja Rp 78,000.00 Rp 1,170.00
0.150 OH Tukang kayu Rp 83,000.00 Rp 12,450.00
A. TENAGA
0.015 OH Kepala Tukang Rp 102,000.00 Rp 1,530.00
0.00075 OH Mandor Rp 81,000.00 Rp 60.75
1.0000 bh Engsel pintu Rp 35,000.00 Rp 35,000.00
B. BAHAN

C. PERALATA

D. JUMLAH (A+B+C) Rp 50,210.75


E. OVER HEAD & PROFI 10% 10% x D Rp 5,021.08
F. HARGA SATUAN PEKERJAAN (D+E) Rp 55,231.83

A.4.6.2.6
1 buah Pasang engsel jendela Jendela A.4.6.2.6
0.010 OH Pekerja Rp 78,000.00 Rp 780.00
0.100 OH Tukang kayu Rp 83,000.00 Rp 8,300.00
A. TENAGA
0.010 OH Kepala Tukang Rp 102,000.00 Rp 1,020.00
0.00050 OH Mandor Rp 81,000.00 Rp 40.50
B. BAHAN 1.0000 bh Engsel jendela Rp 25,000.00 Rp 25,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 35,140.50


E. OVER HEAD & PROFI 10% 10% x D Rp 3,514.05
F. HARGA SATUAN PEKERJAAN (D+E) Rp 38,654.55
A.4.6.2.7
1 buah Pasang engsel jendela A.4.6.2.7
0.010 OH Pekerja Rp 78,000.00 Rp 780.00
0.200 OH Tukang kayu Rp 83,000.00 Rp 16,600.00
A. TENAGA
0.020 OH Kepala Tukang Rp 102,000.00 Rp 2,040.00
0.00050 OH Mandor Rp 81,000.00 Rp 40.50
B. BAHAN 1.0000 bh Engsel jendela Rp 25,000.00 Rp 25,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 44,460.50


E. OVER HEAD & PROFI 10% 10% x D Rp 4,446.05
F. HARGA SATUAN PEKERJAAN (D+E) Rp 48,906.55

A.4.6.2.8
1 buah Pasang grendel pintu A.4.6.2.8
0.015 OH Pekerja Rp 78,000.00 Rp 1,170.00
0.150 OH Tukang kayu Rp 83,000.00 Rp 12,450.00
A. TENAGA
0.015 OH Kepala Tukang Rp 102,000.00 Rp 1,530.00
0.00800 OH Mandor Rp 81,000.00 Rp 648.00
B. BAHAN 1.0000 bh Grendel pintu Rp 40,000.00 Rp 40,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 55,798.00


E. OVER HEAD & PROFI 10% 10% x D Rp 5,579.80
F. HARGA SATUAN PEKERJAAN (D+E) Rp 61,377.80

A.4.6.2.8a
1 buah Pasang grendel jendela A.4.6.2.8a
0.015 OH Pekerja Rp 78,000.00 Rp 1,170.00
0.150 OH Tukang kayu Rp 83,000.00 Rp 12,450.00
A. TENAGA
0.015 OH Kepala Tukang Rp 102,000.00 Rp 1,530.00
0.00800 OH Mandor Rp 81,000.00 Rp 648.00
B. BAHAN 1.0000 bh Grendel jendela Rp 8,000.00 Rp 8,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 23,798.00


E. OVER HEAD & PROFI 10% 10% x D Rp 2,379.80
F. HARGA SATUAN PEKERJAAN (D+E) Rp 26,177.80

A.4.6.2.9
1 buah Pasang hak angin A.4.6.2.9
0.015 OH Pekerja Rp 78,000.00 Rp 1,170.00
0.150 OH Tukang kayu Rp 83,000.00 Rp 12,450.00
A. TENAGA
0.015 OH Kepala Tukang Rp 102,000.00 Rp 1,530.00
0.00075 OH Mandor Rp 81,000.00 Rp 60.75
B. BAHAN 1.0000 bh Hak angin Rp 15,000.00 Rp 15,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 30,210.75


E. OVER HEAD & PROFI 10% 10% x D Rp 3,021.08
F. HARGA SATUAN PEKERJAAN (D+E) Rp 33,231.83
A.4.6.2.12
1 buah Pasang pegangan pintu/ door holder A.4.6.2.12
0.050 OH Pekerja Rp 78,000.00 Rp 3,900.00
0.500 OH Tukang kayu Rp 83,000.00 Rp 41,500.00
A. TENAGA
0.050 OH Kepala Tukang Rp 102,000.00 Rp 5,100.00
0.00250 OH Mandor Rp 81,000.00 Rp 202.50
B. BAHAN 1.0000 bh Pegangan pintu Rp 95,000.00 Rp 95,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 145,702.50


E. OVER HEAD & PROFI 10% 10% x D Rp 14,570.25
F. HARGA SATUAN PEKERJAAN (D+E) Rp 160,272.75

A.4.6.2.12a
1 buah Pasang pegangan jendela/handel A.4.6.2.12a
0.050 OH Pekerja Rp 78,000.00 Rp 3,900.00
0.500 OH Tukang kayu Rp 83,000.00 Rp 41,500.00
A. TENAGA
0.050 OH Kepala Tukang Rp 102,000.00 Rp 5,100.00
0.00300 OH Mandor Rp 81,000.00 Rp 243.00
B. BAHAN 1.0000 bh Pegangan jendela/ handel Rp - Rp -

C. PERALATA

D. JUMLAH (A+B+C) Rp 50,743.00


E. OVER HEAD & PROFI 10% 10% x D Rp 5,074.30
F. HARGA SATUAN PEKERJAAN (D+E) Rp 55,817.30

A.4.6.2.17
1 m2 Pasang kaca bening 5 mm A.4.6.2.17
0.015 OH Pekerja Rp 78,000.00 Rp 1,170.00
0.150 OH Tukang kayu Rp 83,000.00 Rp 12,450.00
A. TENAGA
0.015 OH Kepala Tukang Rp 102,000.00 Rp 1,530.00
0.00075 OH Mandor Rp 81,000.00 Rp 60.75
1.1000 bh Kaca bening 5 mm Rp 120,000.00 Rp 132,000.00
B. BAHAN
0.0500 KG Sealant Rp 40,000.00 Rp 2,000.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 149,210.75


E. OVER HEAD & PROFI 10% 10% x D Rp 14,921.08
F. HARGA SATUAN PEKERJAAN (D+E) Rp 164,131.83
M A.4.7.1 PEKERJAAN PENGECATAN
A.4.7.1.4
1 m2 Mengecat bidang kayu baru A.4.7.1.4
0.070 OH Pekerja Rp 78,000.00 Rp 5,460.00
0.009 OH Tukang cat Rp 83,000.00 Rp 747.00
A. TENAGA
0.006 OH Kepala Tukang Rp 102,000.00 Rp 612.00
0.0030 OH Mandor Rp 81,000.00 Rp 243.00
0.2000 kg Cat meni Rp 43,000.00 Rp 8,600.00
0.1500 kg Plamir Rp 10,000.00 Rp 1,500.00
B. BAHAN
0.1700 kg Cat dasar Rp 42,000.00 Rp 7,140.00
0.2600 kg Cat penutup Rp 49,000.00 Rp 12,740.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 37,042.00


E. OVER HEAD & PROFI 10% 10% x D Rp 3,704.20
F. HARGA SATUAN PEKERJAAN (D+E) Rp 40,746.20
A.4.7.1.10
1 m2 Mengecat bidang tembok baru A.4.7.1.10
0.020 OH Pekerja Rp 78,000.00 Rp 1,560.00
0.063 OH Tukang cat Rp 83,000.00 Rp 5,229.00
A. TENAGA
0.0063 OH Kepala Tukang Rp 102,000.00 Rp 642.60
0.0030 OH Mandor Rp 81,000.00 Rp 243.00
0.1000 kg Plamir Rp 10,000.00 Rp 1,000.00
B. BAHAN 0.1000 kg Cat dasar Rp 42,000.00 Rp 4,200.00
0.2600 kg Cat penutup Rp 49,000.00 Rp 12,740.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 25,614.60


E. OVER HEAD & PROFI 10% 10% x D Rp 2,561.46
F. HARGA SATUAN PEKERJAAN (D+E) Rp 28,176.06
A.4.7.1.12
1 m2 Mengecat plafon eternit/ gypsum A.4.7.1.12
0.028 OH Pekerja Rp 78,000.00 Rp 2,184.00
0.042 OH Tukang cat Rp 83,000.00 Rp 3,486.00
A. TENAGA
0.004 OH Kepala Tukang Rp 102,000.00 Rp 428.40
0.0025 OH Mandor Rp 81,000.00 Rp 202.50
0.1200 kg Cat dasar Rp 42,000.00 Rp 5,040.00
B. BAHAN
0.1800 kg Cat penutup Rp 49,000.00 Rp 8,820.00

C. PERALATA

D. JUMLAH (A+B+C) Rp 20,160.90


E. OVER HEAD & PROFI 10% 10% x D Rp 2,016.09
F. HARGA SATUAN PEKERJAAN (D+E) Rp 22,176.99

Banda Aceh, 8 Juni 2018


Penyedia Jasa,
CV. GLOBAL KENCANA

IRWANSYAH
Direktur
DAFTAR HARGA UPAH DAN BAHAN
PEKERJAAN : PENYELESAIAN PEMBANGUNAN RKB SMPN 3 BANDA ACEH
LOKASI : KOTA BANDA ACEH
TAHUN ANGGARA: 2018

HARGA
NO URAIAN PEKERJAAN SATUAN
(RP)
1 2 3 4

A. UPAH
1 Pekerja Hari 78,000.00
2 Tukang Hari 83,000.00
3 Kepala Tukang Hari 102,000.00
4 Mandor Hari 81,000.00

B. BAHAN
1 Tanah Urug M3 55,000.00
2 Pasir Urug M3 100,000.00
3 Pasir Pasang M3 140,000.00
4 Pasir Beton M3 160,000.00
5 Kerikil Beton M3 160,000.00
6 Batu Pecah M3 180,000.00
7 Batu Kali/Batu Belah M3 170,000.00
8 Batu Bata Buah 705.00
9 Paving Block M2 87,000.00
10 Air Liter 100.00
11 Plaound Asbes 100 x 100 cm' Lbr 19,300.00
12 Roster batu kerawang Buah 10,000.00
13 Semen @ 40 Kg Zak 54,000.00
14 Semen @ 40 Kg Kg 1,350.00
15 Semen Warna @ 50 Kg Zak 230,000.00
16 Semen Warna @ 50 Kg Kg 4,600.00
17 Seng Metal Warna M2 65,000.00
18 Rabung Seng Metal Warna Lbr 50,000.00
19 Nok Samping seng metal Lbr 50,000.00
20 Kayu Kosen M' 80,000.00
21 Papan Kayu Meuranti M3 4,000,000.00
22 Kayu / Papan Bauwplank M3 2,900,000.00
23 Kayu Rangka Plafond M3 4,000,000.00
24 Kayu Balok / Papan Perancah M3 2,900,000.00
25 Kayu Kls III M3 2,900,000.00
26 Kayu Kls II M3 4,000,000.00
27 Kayu Kemper Papan 3/20 M3 4,000,000.00
28 Dolken Kayu ø 8-10/4 m Batang 10,000.00
29 Daun Pintu M2 350,000.00
30 Daun jendela M2 200,000.00
31 Triplex tebal 4 mm' Lembar 69,000.00
32 Plywood tebal 12 mm Lembar 200,000.00
33 Plywood tebal 9 mm Lembar 155,000.00
34 Besi Beton Polos Kg 12,000.00
35 Besi Beton Ulir Kg 14,000.00
36 Besi Plat Stip Kg 20,000.00
37 Besi Hollow 10 x 40 x 0.2 m' 14,000.00
38 Batu alam M2 180,000.00
39 Kawat Beton Kg 16,000.00
40 Paku Kayu 2" - 5" Kg 15,000.00
41 Gypsum board 9 mm Lbr 115,000.00
42 List Profil Gybsum m' 6,000.00
43 Paku Skrup Kg 90,000.00
44 Paku Kayu Kg 15,000.00
45 Keramik 60 x 60 cm' Buah 110,000.00
46 Keramik 40 x 40 cm' Pholised Buah 9,900.00
47 Keramik 40 x 40 cm' Unpholised Buah 10,300.00
48 Keramik 20 x 20 cm' Unpholised Buah 2,800.00
49 Keramik 20 x 25 cm' pholised Buah 3,800.00
50 Keramik 30 x 30 cm' Unpholised Buah 5,500.00
51 Keramik 30 x 30 cm' pholised Buah 6,000.00
52 Stepnoising 10 x 20 cm Buah 10,300.00
53 Plamur Kg 10,000.00
54 Cat Dasar Kg 42,000.00
55 Cat Menie Kg 43,000.00
56 Cat Kayu/Minyak Kg 58,000.00
57 Cat Dinding Acrylic Emultion Paint Kg 49,000.00
58 Minyak Bekisting Liter 6,000.00
59 Lem Kayu Kg 18,000.00
60 Kunci Tanam Buah 120,000.00
61 Kunci Tanam Silinder Buah 150,000.00
62 Engsel Pintu Buah 35,000.00
63 Engsel Jendela Buah 25,000.00
64 Kait Angin Buah 15,000.00
65 Tarikan Jendela Buah 9,000.00
66 Pacok Jendela Buah 8,000.00
67 Pegangan pintu double Buah 150,000.00
68 Slot pintu double Buah 40,000.00
69 Kaca Bening Tebal 3 mm M2 85,000.00
70 Kaca Bening Tebal 5 mm M2 120,000.00
71 Kaca Reyban Tebal 5 mm M2 122,000.00
72 Sealant Kg 40,000.00
73 Pintu & Kusen UPVC M2 1,400,000.00
74 Jendela & Kusen UPVC M2 1,450,000.00
75 Lampu Down Light 20 watt Bh 59,000.00
76 Lampu HE 12 watt Buah 40,000.00
77 Lampu HE 18 wtt Buah 55,000.00
78 Saklar lampu setara Merk Panasonic 1 seri Buah 15,000.00
79 Saklar lampu setara Merk Panasonic 2 seri Buah 19,000.00
80 Saklar lampu setara Merk Panasonic 3 seri Buah 29,000.00
81 Stop kontak Buah 12,000.00
82 Box Panel Distribusi Buah 350,000.00
83 Pemasangan titik api/stop kontak Titik 60,000.00
84 Kloset Jongkok Buah 450,000.00
85 Kloset Duduk Buah 1,200,000.00
86 Wastafel Buah 400,000.00
87 Floor Drain Buah 60,000.00
88 Kran diameter 1/2" Buah 80,000.00
89 Seal tape Buah 4,500.00

Banda Aceh, 8 Juni 2018


Penyedia Jasa,
CV. GLOBAL KENCANA

IRWANSYAH
Direktur
BACK UP DATA PERHITUNGAN BESI DAN BEKISTING
PEMBANGUNAN GEDUNG KULIAH SEKOLAH TINGGI ILMU EKONOMI (STIE)
KEBANGSAAN BLANG BLAHDEH BIREUEN

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
Pondasi Tapak m'
130.476 1.333
150 x 150 cm
16 1.50 0.30 0.45 1.58 5.00 3.72 29.36 2.22 65.238 1.20 2.667
16 1.58 5.00 3.72 29.36 2.22 65.238 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
Pondasi Tapak m'
116.813 2.500
80 x 150 cm
14 0.80 0.30 0.24 1.21 5.00 2.32 14.02 4.17 58.407 1.20 5.000
14 1.21 5.00 2.32 14.02 4.17 58.407 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
16 1.58 8.00 1.00 12.63 8.33 105.222 125.363 1.40 11.667 5.833
Kolom 30/40
14 0.30 0.40 0.12 1.21 2.00 1.00 2.42 8.33 20.140
10 0.62 10.00 1.32 8.14 8.33 67.819 67.819 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
16 1.58 6.00 1.00 9.47 11.11 105.222 132.076 1.20 13.333 6.667
Kolom 30/30
14 0.30 0.30 0.09 1.21 2.00 1.00 2.42 11.11 26.854
10 0.62 10.00 1.12 6.91 11.11 76.725 76.725 2xPakai
0

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Kolom 20/20 16 1.58 0.00 1.00 0.00 25.00 0.000 157.834 0.80 20.000 10.000
16 0.20 0.20 0.04 1.58 4.00 1.00 6.31 25.00 157.834
10 0.62 10.00 0.72 4.44 25.00 110.977 110.977 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Kolom 13/13 242.432 0.26 15.385 7.692
10 0.13 0.13 0.02 0.62 4.00 1.00 2.47 59.17 145.926
8 0.39 6.67 0.62 1.63 59.17 96.506 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Sloof 20/40 16 1.58 8.00 1.00 12.63 12.50 157.834 157.834 0.80 10.000
12 0.20 0.40 0.08 0.89 0.00 1.00 0.00 12.50 0.000 5.000
10 0.62 8.00 1.30 6.41 12.50 80.150 80.150 2xPakai
BACK UP DATA PERHITUNGAN BESI DAN BEKISTING
PEMBANGUNAN GEDUNG KULIAH SEKOLAH TINGGI ILMU EKONOMI (STIE)
KEBANGSAAN BLANG BLAHDEH BIREUEN

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Sloof 20/30 16 1.58 5.00 1.00 7.89 16.67 131.528 131.528 0.60 10.000
12 0.20 0.30 0.06 0.89 0.00 1.00 0.00 16.67 0.000 5.000
10 0.62 8.00 0.92 4.54 16.67 75.629 75.629 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Sloof 15/20 16 1.58 0.00 1.00 0.00 33.33 0.000 118.375 0.40 13.333
12 0.15 0.20 0.03 0.89 4.00 1.00 3.55 33.33 118.375 6.667
10 0.62 6.67 0.62 2.55 33.33 84.945 84.945 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Balok lantai 25/70 16 1.58 8.00 1.00 12.63 5.71 72.153 82.299 1.65 9.429
12 0.25 0.70 0.18 0.89 2.00 1.00 1.78 5.71 10.146 4.714
10 0.62 8.00 2.00 9.86 5.71 56.369 2xPakai
10 0.62 3.33 0.10 0.21 5.71 1.174 57.544 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Balok lantai 25/40 16 1.58 8.00 1.00 12.63 10.00 126.267 144.023 1.05 10.500
12 0.25 0.40 0.10 0.89 2.00 1.00 1.78 10.00 17.756 5.250
10 0.62 10.00 1.40 8.63 10.00 86.315 2xPakai
10 0.62 3.33 0.10 0.21 10.00 2.055 88.370 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Balok lantai 20/40 16 1.58 5.00 1.00 7.89 12.50 98.646 98.646 1.00 12.500
12 0.20 0.40 0.08 0.89 0.00 1.00 0.00 12.50 0.000 6.250
10 0.62 8.00 1.30 6.41 12.50 80.150 80.150 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Balok Bordes 20/30 100.701 0.80 13.333
14 0.20 0.30 0.06 1.21 5.00 1.00 6.04 16.67 100.701 6.667
10 0.62 8.00 1.10 5.43 16.67 90.426 90.426 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Balok Pet 13/13 306.639 0.39 23.077
12 0.13 0.13 0.02 0.89 4.00 1.00 3.55 59.17 210.134 11.538
8 0.39 6.67 0.62 1.63 59.17 96.506 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Ring Balok 20/30 14 1.21 6.00 1.00 7.25 16.67 120.841 120.841 0.80 13.333
12 0.20 0.30 0.06 0.89 0.00 1.00 0.00 16.67 0.000 6.667
10 0.62 8.00 1.10 5.43 16.67 90.426 90.426 2xPakai
BACK UP DATA PERHITUNGAN BESI DAN BEKISTING
PEMBANGUNAN GEDUNG KULIAH SEKOLAH TINGGI ILMU EKONOMI (STIE)
KEBANGSAAN BLANG BLAHDEH BIREUEN

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Ring Balok 20/30 14 1.21 5.00 1.00 6.04 16.67 100.701 100.701 0.80 13.333
12 0.20 0.30 0.06 0.89 0.00 1.00 0.00 16.67 0.000 6.667
10 0.62 8.00 1.10 5.43 16.67 90.426 90.426 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Ring Balok 15/20
12 0.15 0.20 0.03 0.89 4.00 1.00 3.55 33.33 118.375 188.523 0.55 18.333 9.167
8 0.39 6.67 0.80 2.10 33.33 70.148 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Balok latai 13/15
10 0.13 0.15 0.02 0.62 4.00 1.00 2.47 51.28 126.469 215.504 0.30 15.385 7.692
8 0.39 6.67 0.66 1.74 51.28 89.034 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Plat lantai 12 cm 222.981 1.00 8.333 4.167
10 1.00 0.12 0.12 0.62 20.00 1.00 12.33 8.33 102.756
10 0.62 10.00 2.34 14.43 8.33 120.225 2xPakai

DIMENSI (m) Berat Besi Jumlah Batang/M' Berat/m' Jumlah Dimensi/ M3 Berat Besi/m3 Lebar Bekisting
Ø BESI Panjang /
b h m2 (kg) (bh) Kg/m' (bh) (Kg) Bekisting (m2)
m'
Plat lantai 10 cm 195.648 1.00 10.000 5.000
10 1.00 0.10 0.10 0.62 13.33 1.00 8.22 10.00 82.205
10 0.62 8.00 2.30 11.34 10.00 113.443 2xPakai
PEKERJAAN : PENYELESAIAN PEMBANGUNAN RKB SMP NEGERI 3 KOTA BANDA ACEH
LOKASI : KOTA BANDA ACEH
TAHUN ANGGARAN : 2018

BOBOT
NO. URAIAN PEKERJAAN VOLUME SAT
(%)
I II III IV
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
A PEKERJAAN PERSIAPAN
1 Administrasi 1.00 Unit 0.4584 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
2 Papan Nama Proyek 1.00 Unit 0.09 0.031 0.031 0.031
3 Skapolding Perancah ( sewa) 1.00 Ls 0.55 0.079 0.079 0.079 0.079 0.079 0.079 0.079
B PEMBANGUNAN GEDUNG LANTAI - I
I PEKERJAAN TANAH DAN LANTAI
a. Lantai Ruangan Elv. 0 + 0.00
1 Lantai Keramik 40 x 40 cm' pholised 168.00 m2 10.13
2 Bonbon Keramik 2.60 m2 0.02
b. Lantai Selasar Elv. 0 - 0.03
1 Lantai Keramik 40 x 40 cm' Unpholised 42.00 m2 2.51
2 Bonbon Keramik 18.90 m2 0.11
c. Lantai Tangga Lt 1, 2.,3
1 Lantai Keramik 40 x 40 cm' Unpholised 25.38 1.52
2 Bonbon Keramik 53.68 0.31
d Lantai Ram dan tangga
1 Lantai Keramik 40 x 40 cm' Unpholised 17.40 1.04
2 Bonbon Keramik 9.00 0.05
II PEK. PASANGAN KUSEN PINTU DAN JENDELA
1 Pintu Type P1 = 2 Unit
- Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua 2.00 Unit 0.67
- Anak Jalusi Ventilasi 6.92 m2 1.11
- Kunci Tanam 2.00 Bh 0.11
- Engsel Pintu 6.00 bh 0.10
- Pegangan Pintu Stainless 2.00 bh 0.09
- Sloot Double Pintu 2.00 bh 0.04
2 Jendela Type J1 = 10 Unit
- Daun Jendela 30.00 bh 2.29
- Anak Jalusi Ventilasi 7.20 m2 1.15
- Kaca 5 mm Bening 9.79 m2 0.49
- Engsel Jendela 60.00 bh 0.71
- Hak Angin Jendela 60.00 bh 0.61
- Pacok Jendela 30.00 bh 0.24
- Tarikan Jendela 30.00 bh 0.09
III PEKERJAAN PENGECATAN
1 Cat Tembok (L/D) 468.97 m2 4.04
2 Cat Langi-langit Beton Ruangan dan selasar 215.40 m2 1.85
3 Cat kusen Pintu dan Jendela 29.87 m2 0.37
4 Cat Daun Pintu Dan Jendela 10.32 m2 0.13
5 Cat Jalusi 16.32 m2 0.20
IV PEKERJAAN LAIAN - LAIN
1 Besi Pagar reling Ramm 11.10 m2 2.04
2 Pemasangan Tarlis Hollow Pengaman tangga 7.18 m2 0.77
3 Pemasangan Pintu Pengaman tangga 200 x 100 cm 1.00 Unit 0.46
4 Pemasangan Batu alam pada Tiang Depan 8.00 Unit 3.91
C PEMBANGUNAN GEDUNG LANTAI - II
I PEKERJAAN LANTAI
a. Lantai Ruangan Elv. 0 + 4.00
1 Lantai Keramik 40 x 40 cm' pholised 153.00 m2 9.23
2 Bonbon Keramik 2.60 m2 0.02
b. Lantai Selasar Elv. 0 - 3.95
1 Lantai Keramik 40 x 40 cm' Unpholised 38.85 m2 2.32
II PEK. PASANGAN KUSEN PINTU DAN JENDELA
1 Pintu Type P1 = 2 Unit
- Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua 2.00 Unit 0.67
- Anak Jalusi Ventilasi 0.96 m2 0.15
- Kunci Tanam 2.00 Bh 0.11
- Engsel Pintu 6.00 bh 0.10
- Pegangan Pintu Stainless 2.00 bh 0.09
- Sloot Double Pintu 2.00 bh 0.04
2 Jendela Type J1 = 10 Unit
- Daun Jendela 30.00 bh 2.29
- Anak Jalusi Ventilasi 7.20 m2 1.15
- Kaca 5 mm Bening 9.79 m2 0.49
- Engsel Jendela 60.00 bh 0.71
- Hak Angin Jendela 60.00 bh 0.61
- Pacok Jendela 30.00 bh 0.24
- Tarikan Jendela 30.00 bh 0.09
III PEKERJAAN PENGECATAN
1 Cat Tembok (L/D) 518.04 m2 4.46
2 Cat Langi-langit Beton Ruangan dan selasar 215.40 m2 1.85
3 Cat kusen Pintu dan Jendela 29.87 m2 0.37
4 Cat Daun Pintu Dan Jendela 10.32 m2 0.13
5 Cat Jalusi 16.32 m2 0.20
IV PEKERJAAN LAIAN - LAIN
1 Pemasangan Tarlis Pengaman 52.41 m2 5.61
D PEMBANGUNAN GEDUNG LANTAI - III
I PEKERJAAN LANTAI
a. Lantai Ruangan Elv. + 7.80
1 Lantai Keramik 40 x 40 cm' pholised 153.00 m2 9.23 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659
2 Bonbon Keramik 2.60 m2 0.02 0.008 0.008
b. Lantai Selasar Elv. + 7.77
1 Lantai Keramik 40 x 40 cm' Unpholised 38.85 m2 2.32 0.774 0.774 0.774
II PEK. PASANGAN KUSEN PINTU DAN JENDELA
1 Pintu Type P1 = 2 Unit
- Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua 2.00 Unit 0.67 0.336 0.336
- Anak Jalusi Ventilasi 0.96 m2 0.15 0.077 0.077
- Kunci Tanam 2.00 Bh 0.11 0.055 0.055
- Engsel Pintu 6.00 bh 0.10 0.051 0.051
- Pegangan Pintu Stainless 2.00 bh 0.09 0.046 0.046
- Sloot Double Pintu 2.00 bh 0.04 0.019 0.019
2 Jendela Type J1 = 10 Unit
- Daun Jendela 30.00 bh 2.29 0.382 0.382
- Anak Jalusi Ventilasi 7.20 m2 1.15 0.192 0.192
- Kaca 5 mm Bening 9.79 m2 0.49 0.082 0.082
- Engsel Jendela 60.00 bh 0.71 0.118 0.118
- Hak Angin Jendela 60.00 bh 0.61 0.102 0.102
- Pacok Jendela 30.00 bh 0.24 0.040 0.040
- Tarikan Jendela 30.00 bh 0.09 0.015 0.015
III PEKERJAAN PENGECATAN
Cat Tembok (L/D) 567.52 m2 4.89
Cat Plafond Plywood dan List Plafond 288.34 m2 1.95
1 Cat kusen Pintu dan Jendela 31.54 m2 0.39
2 Cat Daun Pintu Dan Jendela 10.32 m2 0.13
3 Cat Jalusi 18.84 m2 0.23
IV PEKERJAAN LAIN - LAIN
1 Pemasangan Tarlis Pengaman 40.59 m2 4.34
2 Perbaiki atap seng yang bocor 1.00 Ls 0.24 0.041 0.041 0.041 0.041 0.041 0.041
3 Pembersihan Akhir 1.00 paket 0.31
Serah Terima Pertama/Provision Hand Over (PHO)

###
0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.8 0.8 0.8 0.6 0.6 0.9 0.9
0 0.0 0.1 0.2 0.2 0.3 0.3 0.4 1.1 1.8 2.6 3.3 4.1 4.8 5.6 6.2 6.9 7.6 8.2 8.9 9.5 ### ### ### ### ### ### ### ###
JADWAL WAKTU PELAKSANAAN PEKERJAAN

JADWAL PELAKSANAAN PEKERJAAN


V VI VII VIII IX X
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.724 0.724 0.724 0.724 0.724 0.724 0.724 0.724 0.724 0.724 0.724 0.724 0.724 0.724
0.008 0.008

0.836 0.836 0.836


0.055 0.055

0.505 0.505 0.505


0.156 0.156

0.520 0.520
0.026 0.026

0.336 0.336
0.553 0.553
0.055 0.055
0.051 0.051
0.046 0.046
0.019 0.019

0.764 0.764 0.764


0.383 0.383 0.383
0.164 0.164 0.164
0.236 0.236 0.236
0.203 0.203 0.203
0.080 0.080 0.080
0.031 0.031 0.031

0.489 0.489 0.489 0.489 0.489

0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659 0.659
0.008 0.008

0.774 0.774 0.774

0.336 0.336
0.077 0.077
0.055 0.055
0.051 0.051
0.046 0.046
0.019 0.019

0.382 0.382 0.382 0.382 0.382 0.382


0.192 0.192 0.192 0.192 0.192 0.192
0.082 0.082 0.082 0.082 0.082 0.082
0.118 0.118 0.118 0.118 0.118 0.118
0.102 0.102 0.102 0.102 0.102 0.102
0.040 0.040 0.040 0.040 0.040 0.040
0.015 0.015 0.015 0.015 0.015 0.015

0.382 0.382 0.382 0.382


0.192 0.192 0.192 0.192
0.082 0.082 0.082 0.082
0.118 0.118 0.118 0.118
0.102 0.102 0.102 0.102
0.040 0.040 0.040 0.040
0.015 0.015 0.015 0.015

0.395 0.395 0.395 0.395 0.395

1.6 1.6 1.6 1.6 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 1.4 1.5 1.5 1.3 1.3 1.7 1.7 1.7 1.7 1.7 2.2 1.4 1.4 1.3 2.1 0.9 0.9 1.1 1.1 1.9 1.9 1.9 0.9 0.9 0.9 0.9 0.9
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
ERJAAN
X XI XII XIII XIV XV XVI
69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

0.337 0.337 0.337


0.464 0.464 0.464

0.509 0.509 0.509 0.509


0.154 0.154 0.154 0.154 0.154
0.153 0.153 0.153
0.489 0.489 0.489

0.372 0.372 0.372 0.372 0.372 0.372 0.372 0.372 0.372 0.372
0.618 0.618 0.618
0.062 0.062 0.062 0.062 0.062 0.062
0.043 0.043 0.043
0.068 0.068

0.467 0.467 0.467 0.467 0.467 0.467 0.467 0.467 0.467 0.467 0.467 0.467

0.407 0.407 0.407 0.407 0.407 0.407 0.407 0.407 0.407 0.407 0.407 0.407
0.391 0.391 0.391 0.391 0.391
0.056 0.056 0.056 0.056 0.056 0.056 0.056
0.043 0.043 0.043
0.047 0.047 0.047 0.047 0.047

0.395 0.395 0.395 0.395 0.395 0.395

0.9 0.9 0.9 0.4 0.9 0.9 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.9 0.9 0.9 0.9 0.5 0.5 0.5 0.6 0.6 0.7 0.7 0.7 1.2 1.2 1.6 0.9 0.8 0.4 0.4 0.5 0.5 1.2 1.2 1.2
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
KET
XVI XVII
109 110 111 112 113 114 115 116 117 118 119 120

0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 100

90

80

70

0.337 0.337 0.337 0.337 0.337 0.337 0.337 0.337 0.337


0.464
0.074 0.074 0.074 0.074 0.074
0.032 0.032 0.032 0.032
0.068 0.068 0.068

60

50

40

0.372 0.372

0.068

30

20

10

0.076 0.076 0.076 0.076 0


PHO PHO PHO

1.3 0.8 0.4 0.4 0.4 0.4 0.4 0.5 0.4 0.1 0.1 -
### ### ### ### ### ### ### ### ### ### ### ###

Banda Aceh, 8 Juni 2018


KET
XVI XVII
Penyedia Jasa,
CV. GLOBAL KENCANA

IRWANSYAH
Direktur
DAFTAR PEKERJAAN YANG DISUBKONTRAKKAN

Nama Perusahaan : CV. GLOBAL KENCANA


Pekerjaan : PENYELESAIAN PEMBANGUNAN RKB SMPN 3 BANDA ACEH
Tahun Anggaran : 2018

PERSENTASE DARI HARGA

NO. MATA PEMBAYARAN JENIS ITEM PEKERJAAN TOTAL HARGA PENAWARAN

(%)

N I H I L

TOTAL (%) -

Banda Aceh, 8 Juni 2018


Penyedia Jasa,
CV. GLOBAL KENCANA

IRWANSYAH
Direktur
PRA RENCANA KESELAMATAN DAN KESEHATAN
KERJA KONTRAK (PRA - RK3K)

PRA RENCANA KESELAMATAN


KESEHATAN DAN
KERJA KONTRAK
CV. GLOBAL KENCANA
(PRA - RK3K)

1. KEBIJAKAN K3
Saya yang bertanda tangan dibawah ini :

Nama : IRWANSYAH
Jabatan : Direktur
Alamat : Jl. Banda Aceh - Medan Km. 17.5 Gp. Baet Mesjid Kec. Suka Makmur Aceh Besar

Dengan ini menyatakan bahwa dalam melaksanakan kegiatan konstruksi bila dipercaya menjadi pelaksana pekerjaan ini akan menerapkan sistem keselamatan dan
kesehatan kerja (K3) bagi semua karyawan maupun pekerja dalam melaksanakan pekerjaan baik di lapangan maupun dikantor.

Demikian pernyataan saya ini perbuat dengan sesungguh-sungguhnya dan akan dilaksanakan di lapangan.

2. PERENCANAAN
1) Identifikasi Bahaya dan Pengendalian Resiko Bahaya

No. Jenis / Tipe Identifikasi Jenis Bahaya & Pengendalian Resiko


Pekerjaan Resiko K3 K3

I PEKERJAAN PERSIAPAN
1 Administrasi # Terkena alat bantu # Memakai Peralatan APD lengkap
2 Papan Nama Proyek # Tertimpa Papan Nama Proyek # Memberi Instruksi Kerja
3 Skapolding Perancah ( sewa) # Tertusuk Paku # Memasang Rambu - Rambu
# Terjatuh dari ketinggian # Mematuhi peraturan lalulintas
# Tertimpa Scafolding # Memakai Pengikat Pada Badan

II PEKERJAAN TANAH DAN LANTAI


1 Lantai Keramik 40 x 40 cm' pholised # Terkena Mesin Pemotong Keramik # Memakai Peralatan APD lengkap
2 Bonbon Keramik # Terkena pasta semen # Memberi Instruksi Kerja
# Terkena peralatan kerja # Memasang Rambu - Rambu
# Terhirup Debu Semen

III PEK. PASANGAN KUSEN PINTU DAN JENDELA


1 Pintu Type P1 = 2 Unit # Terjepit Daun Pintu & Jendela # Memakai Peralatan APD lengkap
Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua # Terkena Paku # Memberi Instruksi Kerja
Anak Jalusi Ventilasi # Terkena Alat Potong Kayu # Memasang Rambu - Rambu
Kunci Tanam # Terkena Pecahan Kaca
Engsel Pintu
Pegangan Pintu Stainless
Sloot Double Pintu
2 Jendela Type J1 = 10 Unit
Daun Jendela
Anak Jalusi Ventilasi
Kaca 5 mm Bening
Engsel Jendela
Hak Angin Jendela
Pacok Jendela
Tarikan Jendela

IV PEKERJAAN PENGECATAN
1 Cat Tembok (L/D) # Terkena cipratan Cat # Memakai Peralatan APD lengkap
2 Cat Langi-langit Beton Ruangan dan selasar # Terjatuh Dari Ketinggian # Memberi Instruksi Kerja
3 Cat kusen Pintu dan Jendela # Tertimpa Scafolding # Memasang Rambu - Rambu
4 Cat Daun Pintu Dan Jendela
5 Cat Jalusi
V PEKERJAAN LAIAN - LAIN
1 Besi Pagar reling Ramm # Terjepit Besi # Memakai Peralatan APD lengkap
2 Pemasangan Tarlis Hollow Pengaman tangga # Terpotong Tanggan Dengan Alat Potong # Memberi Instruksi Kerja
3 Pemasangan Pintu Pengaman tangga 200 x 100 cm # Tersengat Aru Listrik Las # Memasang Rambu - Rambu
4 Pemasangan Batu alam pada Tiang Depan # Iritasi Mata Terkena Sinar Las # Memakai Baju Anti Listrik
5 Pemasangan Tarlis Pengaman # Terjatuh dari Ketinggian # Memakai Kaca Mata Hitam
6 Perbaiki atap seng yang bocor # Terkena Seng
# Terkena Paku
# Terjatuh dari Ketinggian

2) Pemenuhan Perudang-Undangan dan Persyaratan Lainnya

(Daftar Peraturan Perundang-undangan dan persyaratan lain yang terkait dengan K3, sesuai dengan pekerjaan/kegiatan konstruksi yang akan dilaksanakan).

Daftar Peraturan Perundang-undangan dan Persyaratan K3 yang wajib dipunyai dan dipenuhi dalam melaksanakan paket pekerjaan ini adalah :
a. UU No 1 Tahun 1970 tentang Keselamatan Kerja UU No. 18.
b. Tahun 1999 tentang Jasa Konstruksi.
c. Peraturan Menteri PU No. 09/PRT/M/2008 tentang Pedoman Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Konstruksi Bidang PU.

3) Sasaran K3 dan Program K3


(Sasaran program K3 yang akan dilaksanakan, harus disusun berdasrkan hasil identifikasi bahaya dan penetapan pengendalian Risiko. Sasaran harus terukur
secara kualitatif maupun kuantitatif).

Sasaran K3
a. Tidak ada kecelakaan kerja yang berdampak korban jiwa (zero fatal accident).
b. Tingkat penerapan elemen SMK3 minimal 80%.
c. Semua pekerja wajib memakai APD yang sesuai bahay dan risiko pekerjaannya masing-masing.

Program K3
a. Melaksanakan Rencana K3 dengan menyediakan sumber daya K3 (APD, rambu-rambu, spanduk, poster, pagar pengaman, jaring pengaman dsb) secara
konsisten.
b. Melakukan inspeksi secara rutin terhadap kondisi dan cara kerja berbahaya.
c. Memastikan semua pekerja untuk mematuhi peraturan yang telah ditetapkan.

Organisasi K3 :
Menyediakan petugas K3 sesuai dengan struktur organisasi yang diusulkan

PENANGGUNG JAWAB K3
Muhammad Yusuf, ST

EMERGENCY / KEDARURATAN P3K KEBAKARAN


Sanneti Hevianis, ST Muhammad Herka, ST Samsul Bahri, ST

Banda Aceh, 8 Juni 2018


Penyedia Jasa,
CV. GLOBAL KENCANA

IRWANSYAH
Direktur
DAFTAR PERSONIL INTI
Nama Perusahaan : CV. GLOBAL KENCANA
Nama Pekerjaan : PENYELESAIAN PEMBANGUNAN RKB SMPN 3 BANDA ACEH
Lokasi : KOTA BANDA ACEH
Tahun Anggaran : 2018

No. Nama Personil Jabatan Di Proyek Ini Umur Tahun Pendidikan Terakhir Profesi / Keahlian Pengalaman (Tahun) Jumlah Sertifikat
SKA/SKT

Ahli Bangunan Gedung dan SKA - Ahli Bangunan Gedung (201) dan
1 Muhammad Yusuf, ST Site Manager 42 S1 Teknik Sipil 3 Tahun 1
Ahli K3 Konstruksi Ahli K3 Konstruksi (603)

2 Sanneti Hevianis, ST Pelaksana I 28 S1 Teknik Sipil Pengawas Mutu Pelaksanaan 3 Tahun 1 SKT Pengawas Mutu Pelaksanaan
Konstruksi Bangunan Gedung Konstruksi Bangunan Gedung (TA 028)

SKT Pelaksana Bangunan Gedung


3 Muhammad Herka, ST Pelaksana II 32 S1 Teknik Sipil Pelaksana Bangunan Gedung 3 Tahun 1
(TA 022).

4 Samsul Bahri, ST Pelaksana III 50 S1 Teknik Arsitektur Juru Gambar Arsitektur 3 Tahun 1 SKT Juru Gambar Arsitektur (TA 003)

5 Fauzi, ST Pelaksana IV 31 S1 Teknik Sipil Mandor Tukang Kayu 3 Tahun 1 SKT Mandor Tukang Kayu (TL 006)

6 Erry Furqan Pelaksana V 31 SMK Tukang Cat Bangunan 3 Tahun 1 SKT Tukang Cat Bangunan (TA 014)

7 Jaka Nugroho Pelaksana VI 31 SMA Tukang Kayu/Carpenter 3 Tahun 1 SKT Tukang Kayu/Carpenter (TA 009)

8 Muhammad Hari Debbriawan Pelaksana VII 24 SMK Tukang Pasang Keramik 3 Tahun 1 SKT Tukang Pasang Keramik (TA 007)

9 Andri Gunawan, ST - 31 S1 Teknik Sipil - - - -

10 Encu Sartika Gustini, SE - 35 S1 Ekonomi Manajemen - - - -

Banda Aceh, 8 Juni 2018


Penyedia Jasa,
CV. GLOBAL KENCANA

IRWANSYAH
Direktur
DAFTAR RIWAYAT PENGALAMAN KERJA TENAGA AHLI
CV. GLOBAL KENCANA

1 Nama : Muhammad Yusuf, ST

2 Tempat Tanggal Lahir : Bireuen, 01/05/1976

3 Alamat : Jl. Pang Raed V Desa Ie Masen Kec. Syiah Kuala Kota Banda Aceh

4 No. KTP : 1171040105760000

5 Pendidikan Terakhir : S1 Teknik Sipil

6 Nomor Ijazah : 1784/2940/TS/2001

7 Nomor Sertifikat Keahlian/Keterampilan : 0552453 dan 0506583

8 Nomor NPWP : 14.720.947.2-101.000

9 Status di Perusahaan : Pegawai Tidak Tetap

10 Pengalaman Perusahaan : CV. GLOBAL KENCANA

Tahun
Ringkasan Pekerjaan
Dari Sampai

A 2015 2015 Pembangunan Gedung Pusat Pelatihan UKM Aceh

B 2016 2016 LANJUTAN REHABILITASI DAN PENGEMBANGAN UPTD PUSKESMAS LAMPULO TAHAP II

C 2017 2017 Pembangunan Perpustakaan SMAN 1 Lhoksukon Kab. Aceh Utara

Aceh Besar, 4 Juni 2018

CV. GLOBAL KENCANA Yang membuat

IRWANSYAH Muhammad Yusuf, ST


Direktur Site Manager
DAFTAR RIWAYAT HIDUP
CV. GLOBAL KENCANA

1 Nama : Sanneti Hevianis, ST

2 Tempat Tanggal Lahir : Banda Aceh, 17/03/1990

3 Alamat : Jl. Keupula Dsn Timur Gampong Kopelma Darussalam Kec. Syiah Kuala Kota Banda Aceh

4 No. KTP : 1171045703900000

5 Pendidikan Terakhir : S1 Teknik Sipil

6 Nomor Ijazah : 2394/5801/TS/2011

7 Nomor Sertifikat Keahlian/Keterampilan : 0369793

8 Nomor NPWP : 16.790.297.2-804.000

9 Status di Perusahaan : Pegawai Tidak Tetap

10 Pengalaman Perusahaan : CV. GLOBAL KENCANA

Tahun
Ringkasan Pekerjaan
Dari Sampai

A 2015 2015 Pembangunan Pagar Samping dan Belakang Kantor Samsat Aceh Timur

B 2016 2016 LANJUTAN PEMBANGUNAN RKB SMPN 2 KOTA BANDA ACEH

C 2017 2017 Pembangunan Perpustakaan SMAN 4 Aceh Barat Daya Kec. Kuala Batee Kab. Aceh Barat Daya

Aceh Besar, 4 Juni 2018

CV. GLOBAL KENCANA Yang membuat

IRWANSYAH Sanneti Hevianis, ST


Direktur Pelaksana I
DAFTAR RIWAYAT HIDUP
CV. GLOBAL KENCANA

1 Nama : Muhammad Herka, ST

2 Tempat Tanggal Lahir : Aceh Besar, 15/03/1986

3 Alamat : Dusun Cut Lem Abu Desa Meunasah Beutong Kec. Lhoknga Kab. Aceh Besar

4 No. KTP : 1106021503860000

5 Pendidikan Terakhir : S1 Teknik Sipil

6 Nomor Ijazah : 1345/5.01/301/STTIT/2009

7 Nomor Sertifikat Keahlian/Keterampilan : 0369353

8 Nomor NPWP : 66.423.995.1-101.000

9 Status di Perusahaan : Pegawai Tidak Tetap

10 Pengalaman Perusahaan : CV. GLOBAL KENCANA

Tahun
Ringkasan Pekerjaan
Dari Sampai

A 2015 2015 Lanjutan Pembangunan Tribun Kolam Renang Kab. Aceh Tengah

B 2016 2016 Renovasi Gedung A Lanjutan Balai Besar POM di Banda Aceh

C 2017 2017 Pembangunan Kantin Sehat SMKN 1 Darul Kab. Aceh Besar

Aceh Besar, 4 Juni 2018

CV. GLOBAL KENCANA Yang membuat

IRWANSYAH Muhammad Herka, ST


Direktur Pelaksana II
DAFTAR RIWAYAT HIDUP
CV. GLOBAL KENCANA

1 Nama : Samsul Bahri, ST

2 Tempat Tanggal Lahir : Ajuen, 18/11/1968

3 Alamat : Jl. Darusallam Desa Hagu Selatan Kecamatan Banda Sakti Kota Lhoksumawe

4 No. KTP : 1173021811680002

5 Pendidikan Terakhir : S1 Teknik Arsitektur

6 Nomor Ijazah : 311893/033/TA-019/2003

7 Nomor Sertifikat Keahlian/Keterampilan : 0348500

8 Nomor NPWP : 74.783.575.9-102.000

9 Status di Perusahaan : Pegawai Tidak Tetap

10 Pengalaman Perusahaan : CV. GLOBAL KENCANA

Tahun
Ringkasan Pekerjaan
Dari Sampai

A 2015 2015 Lanjutan Pembangunan Gudang P2PL

B 2016 2016 LANJUTAN REHABILITASI DAN PENGEMBANGAN UPTD PUSKESMAS LAMPULO TAHAP II

C 2017 2017 Pembangunan Kantin Sehat SMAN 1 Simpang Tiga Kab. Aceh Besar

Aceh Besar, 4 Juni 2018

CV. GLOBAL KENCANA Yang membuat

IRWANSYAH Samsul Bahri, ST


Direktur Pelaksana III
DAFTAR RIWAYAT HIDUP
CV. GLOBAL KENCANA

1 Nama : Fauzi, ST

2 Tempat Tanggal Lahir : Lhoksumawe, 14/11/1987

3 Alamat : Asrama GAB TNI AD Bireuen Desa Bandar Bireuen Kec. Kota Juang Kab. Bireuen

4 No. KTP : 1111131411870000

5 Pendidikan Terakhir : S1 Teknik Sipil

6 Nomor Ijazah : 1.1.1.00219/003222

7 Nomor Sertifikat Keahlian/Keterampilan : 1091644

8 Nomor NPWP : 16.904.479.9-104.000

9 Status di Perusahaan : Pegawai Tidak Tetap

10 Pengalaman Perusahaan : CV. GLOBAL KENCANA

Tahun
Ringkasan Pekerjaan
Dari Sampai

A 2015 2015 Pembangunan Dapur Pangan Aceh

B 2016 2016 Pembangunan Gedung Kantor UPTB

C 2017 2017 Rehabilitasi Ruang Kelas Belajar SMAN Darul Imarah Kab. Aceh Besar

Aceh Besar, 4 Juni 2018

CV. GLOBAL KENCANA Yang membuat

IRWANSYAH Fauzi, ST
Direktur Pelaksana IV
DAFTAR RIWAYAT HIDUP
CV. GLOBAL KENCANA

1 Nama : Erry Furqan

2 Tempat Tanggal Lahir : Lhoksumawe, 25/12/1987

3 Alamat : Dusun Tgk. Abah Krueng, Beuringin Lb, Kec. Lhoksukon Kabupaten Aceh Utara

4 No. KTP : 1108042512870000

5 Pendidikan Terakhir : SMK

6 Nomor Ijazah : DN-06 Mk 0451104

7 Nomor Sertifikat Keahlian/Keterampilan : 0369816

8 Nomor NPWP : 54.494.759.1-102.000

9 Status di Perusahaan : Pegawai Tidak Tetap

10 Pengalaman Perusahaan : CV. GLOBAL KENCANA

Tahun
Ringkasan Pekerjaan
Dari Sampai

A 2015 2015 Pembangunan Gedung Flad Bed Vertical Driyer Jagung

B 2016 2016 Pembangunan Sarana dan Prasarana Mesjid Nurul Huda Blang Bintang Kab. Aceh Besar (OA)

C 2017 2017 Rehabilitasi Asrama SMAN Modal Bangsa

Aceh Besar, 4 Juni 2018

CV. GLOBAL KENCANA Yang membuat

IRWANSYAH Erry Furqan


Direktur Pelaksana V
DAFTAR RIWAYAT HIDUP
CV. GLOBAL KENCANA

1 Nama : Jaka Nugroho

2 Tempat Tanggal Lahir : Sumber Sari, 7/02/1987

3 Alamat : Jl. Tulip No. 15 Palu Desa Balaroa Kec. Palu Barat Kota Palu

4 No. KTP : 7271020702870000

5 Pendidikan Terakhir : SMA

6 Nomor Ijazah : 24Ma0341214

7 Nomor Sertifikat Keahlian/Keterampilan : 1071189

8 Nomor NPWP : 55.129.910.2-101.000

9 Status di Perusahaan : Pegawai Tidak Tetap

10 Pengalaman Perusahaan : CV. GLOBAL KENCANA

Tahun
Ringkasan Pekerjaan
Dari Sampai

A 2015 2015 Pembangunan RKB SMKN 1 Ulim Kab. Pidie Jaya

B 2016 2016 Pembangunan Asrama Putri Nagan Raya Banda Aceh (OA)

C 2017 2017 Pembangunan Mushalla MUQ Pagar Air Provinsi Aceh

Aceh Besar, 4 Juni 2018

CV. GLOBAL KENCANA Yang membuat

IRWANSYAH Jaka Nugroho


Direktur Pelaksana VI

DAFTAR RIWAYAT HIDUP


CV. GLOBAL KENCANA

1 Nama : Muhammad Hari Debbriawan

2 Tempat Tanggal Lahir : Banda Aceh, 18/12/1994

3 Alamat : Dusun IV Tgk Malem 66 Dea Ajuen Kec. Pekan Bada Kab. Aceh Besar

4 No. KTP : 1106081812940000

5 Pendidikan Terakhir : SMK

6 Nomor Ijazah : DN-06 Mk 0000255

7 Nomor Sertifikat Keahlian/Keterampilan : 0482420

8 Nomor NPWP : 75.626.848.8-101.000

9 Status di Perusahaan : Pegawai Tidak Tetap

10 Pengalaman Perusahaan : CV. GLOBAL KENCANA

Tahun
Ringkasan Pekerjaan
Dari Sampai

A 2015 2015 Pembangunan Baru Gedung Ponek RSUD (Migas Kab)


Pembangunan 2 RKB dan 1 Ruang UKS di Lantai III SMAS Islam Tgk. Chik Di Beureu-eh Kec.
B 2016 2016
Mutiara Kab. Pidie
C 2017 2017 Pembangunan Pagar Dayah Manarul Islam Kab. Aceh Tamiang

Aceh Besar, 4 Juni 2018

CV. GLOBAL KENCANA Yang membuat


IRWANSYAH Muhammad Hari Debbriawan
Direktur Pelaksana VII
STRUKTUR ORGANISASI LAPANGAN
Nama Perusahaan : CV. GLOBAL KENCANA
Nama Pekerjaan : PENYELESAIAN PEMBANGUNAN RKB SMPN 3 BANDA ACEH

IRWANSYAH
Direktur

Samsul Bahri, ST Muhammad Yusuf, ST Erry Furqan


Pelaksana III Site Manager Pelaksana V

Fauzi, ST Sanneti Hevianis, ST Jaka Nugroho


Pelaksana IV Pelaksana I Pelaksana VI

Muhammad Hari Debbriawan Muhammad Herka, ST


Pelaksana VII Pelaksana II

Banda Aceh, 8 Juni 2018


Penyedia Jasa,
CV. GLOBAL KENCANA

IRWANSYAH
Direktur
DAFTAR PERALATAN UTAMA

Nama Perusahaan : CV. GLOBAL KENCANA


Nama Pekerjaan : PENYELESAIAN PEMBANGUNAN RKB SMPN 3 BANDA ACEH
Lokasi : KOTA BANDA ACEH
Tahun Anggaran : 2018

No. Nama Jumlah Merk dan Model Tahun Pembuatan Ukuran Kapasitas atau Status Kepemilikan Peralatan Kondisi (%) Lokasi Alat
Daya Saat Ini

Milik Sewa

1 Dump Truck 1 Unit Mitsubishi 2012 6 Ton - Sewa 80% Banda Aceh

2 Mobil Pick Up 1 Unit Mitsubishi L300 2006 2 m3 - Sewa 80% Banda Aceh

3 Concrete Mixer 1 Unit Tiger 2017 500 Liter - Sewa 90% Banda Aceh

4 Generator Set 1 Unit Yamaha 2016 3000 Wat - Sewa 90% Banda Aceh

5 Kereta Sorong 5 Unit Artco 2017 0.5 M3 - Sewa 90% Banda Aceh

6 Alat Ukur 2 Set Top Con 2000 - - Sewa 80% Banda Aceh

Banda Aceh, 8 Juni 2018


Penyedia Jasa,
CV. GLOBAL KENCANA

IRWANSYAH
Direktur
URAIAN PEKERJAAN

2
PEKERJAAN PERSIAPAN
Administrasi
Papan Nama Proyek
Skapolding Perancah ( sewa)
PEMBANGUNAN GEDUNG LANTAI - I
PEKERJAAN TANAH DAN LANTAI
Lantai Ruangan Elv. 0 + 0.00
Lantai Keramik 40 x 40 cm' pholised
Bonbon Keramik
Lantai Selasar Elv. 0 - 0.03
Lantai Keramik 40 x 40 cm' Unpholised
Bonbon Keramik
Lantai Tangga Lt 1, 2.,3
Lantai Keramik 40 x 40 cm' Unpholised
Bonbon Keramik
Lantai Ram dan tangga
Lantai Keramik 40 x 40 cm' Unpholised
Bonbon Keramik
PEK. PASANGAN KUSEN PINTU DAN JENDELA
Pintu Type P1 = 2 Unit
Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua
Anak Jalusi Ventilasi
Kunci Tanam
Engsel Pintu
Pegangan Pintu Stainless
Sloot Double Pintu
Jendela Type J1 = 10 Unit
Daun Jendela
Anak Jalusi Ventilasi
Kaca 5 mm Bening
Engsel Jendela
Hak Angin Jendela
Pacok Jendela
Tarikan Jendela
PEKERJAAN PENGECATAN
Cat Tembok (L/D)
Cat Langi-langit Beton Ruangan dan selasar
Cat kusen Pintu dan Jendela
Cat Daun Pintu Dan Jendela
Cat Jalusi
PEKERJAAN LAIAN - LAIN
Besi Pagar reling Ramm
Pemasangan Tarlis Hollow Pengaman tangga
Pemasangan Pintu Pengaman tangga 200 x 100 cm
Pemasangan Batu alam pada Tiang Depan
PEMBANGUNAN GEDUNG LANTAI - II
PEKERJAAN LANTAI
Lantai Ruangan Elv. 0 + 4.00
Lantai Keramik 40 x 40 cm' pholised
Bonbon Keramik
Lantai Selasar Elv. 0 - 3.95
Lantai Keramik 40 x 40 cm' Unpholised
PEK. PASANGAN KUSEN PINTU DAN JENDELA
Pintu Type P1 = 2 Unit
Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua
Anak Jalusi Ventilasi
Kunci Tanam
Engsel Pintu
Pegangan Pintu Stainless
Sloot Double Pintu
Jendela Type J1 = 10 Unit
Daun Jendela
Anak Jalusi Ventilasi
Kaca 5 mm Bening
Engsel Jendela
Hak Angin Jendela
Pacok Jendela
Tarikan Jendela
PEKERJAAN PENGECATAN
Cat Tembok (L/D)
Cat Langi-langit Beton Ruangan dan selasar
Cat kusen Pintu dan Jendela
Cat Daun Pintu Dan Jendela
PEKERJAAN LAIAN - LAIN
Pemasangan Tarlis Pengaman
PEMBANGUNAN GEDUNG LANTAI - III
PEKERJAAN LANTAI
Lantai Ruangan Elv. + 7.80
Lantai Keramik 40 x 40 cm' pholised
Bonbon Keramik
Lantai Selasar Elv. + 7.77
Lantai Keramik 40 x 40 cm' Unpholised
PEK. PASANGAN KUSEN PINTU DAN JENDELA
Pintu Type P1 = 2 Unit
Daun Pintu Panel Ukuran 120 x 210 cm Buka Dua
Anak Jalusi Ventilasi
Kunci Tanam
Engsel Pintu
Pegangan Pintu Stainless
Sloot Double Pintu
Jendela Type J1 = 10 Unit
Daun Jendela
Anak Jalusi Ventilasi
Kaca 5 mm Bening
Engsel Jendela
Hak Angin Jendela
Pacok Jendela
Tarikan Jendela
PEKERJAAN PENGECATAN
Cat Tembok (L/D)
Cat Plafond Plywood dan List Plafond
Cat kusen Pintu dan Jendela
Cat Daun Pintu Dan Jendela
Cat Jalusi
PEKERJAAN LAIN - LAIN
Pemasangan Tarlis Pengaman
Perbaiki atap seng yang bocor
Pembersihan Akhir