URAIAN PEKERJAAN
PROGRES (%) KEGIATAN MINGGU INI
SENIN
I DIVISI 1. UMUM
1 Pengukuran Kembali 100%
2 Pembersihan Lokasi 100%
3 Sewa Direksi Kit 100%
4 Papan Nama Proyek 100% SELASA
5 Pengamanan Lingkungan Hidup 100% Lapis Pondasi Agregat Kelas A
6 Penerapan Sistem Manajemen Keselamatan Konstruksi K3 100% Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-WC)
II DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK Laston Lapis Antara (AC-BC) - Levelling
1 Galian Biasa 100% RABU
2 Galian Perkerasan Beraspal Tanpa Cold Milling Machine 100%
Lapis Pondasi Agregat Kelas S (Bahu Jalan)
III DIVISI 5. PERKERASAN BERBUTIR
1 Lapis Pondasi Agregat Kelas A 100%
2 Lapis Pondasi Agregat Kelas S (Bahu Jalan) 100%
3 Perkerasan Beton Semen-fs 45 (Tanpa Tulangan/Wiremesh) 100% KAMIS
4 Lapis Pondasi Bawah Beton Kurus (Lean Concrete) 100%
Lapis Pondasi Agregat Kelas S (Bahu Jalan)
IV DIVISI 6. PERKERASAN ASPAL
2 Lapis Perekat - Aspal Cair/Emulsi 100%
3 Laston Lapis Aus (AC-WC) 100%
4 Laston Lapis Antara (AC-BC) - Levelling 100% JUMAT
PERMASALAHAN
SOLUSI
1 PERSIAPAN KEMBALI PERLENGKAPAN ATRIBUT KESELAMATAN DAN KEAMANAN PELAKSANAAN PROYEK (K3)