LABORATORIUM MEKANIKA TANAH

JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK


UNIVERSITAS LAMPUNG
Jl. Sumantri Brojonegoro No.1 Bandar Lampung - Telp. (0721) 704947 UNIVERSITAS LAMP
Laboratory CBR
Proyek : Pemeriksa :
No. Contoh : Tanggal :

STANDAR / MODIFIED
PENETRASI
Waktu Penurunan Jumlah Pukulan 10 x 25 x 55 x
Beban
(menit) (in) Brt Tanah+Cetakan 8560 8478 8544
55 x 25 x 10 x Berat Cetakan 4003 3987 4003

26.6100 39.9150 26.6100


¼ 0.3175 Berat Tanah Basah 4557 4491 4541

½ 0.6350 53.2200 53.2200 39.9150 Volume cetakan 3,179.25 3,179.25 3,179.25

1 1.2700 79.8300 73.1775 79.8300 Berat Volume Basah 1.4334 1.4126 1.4283

1½ 1.9050 93.1350 79.8300 93.1350 Berat Volume Kering 1.0126 1.0802 1.2280

2 2.5400 159.6600 133.0500 106.4400

3 3.8100 239.4900 186.2700 119.7450 700

4 5.0060 319.3200 212.8800 139.7025

6 7.6200 399.1500 266.1000 146.3550

8 10.1600 452.3700 292.7100 172.9650 600

10 12.7000 478.9800 372.5400 199.5750

KADAR AIR 10 x 25 x 55 x
500
Tanah Basah+Cawan 43.25 41.35 73.24
Tanah Kering+Cawan 33.49 34.21 64.51
Berat Cawan 11 11 11
Berat Air 9.76 7.14 8.73
400
Tanah Kering 22.49 23.21 53.51
Beban

Kadar Air (%) 41.55 30.763 16.315

NILAI CBR 0,1" 0,2"


10 x 106.44 139.703
300

3.548 3.1045
25 x 133.05 212.88
4.435 4.7306
55 x 159.66 319.32 200

5.322 7.096
Berat Volume Kering

1.3
100
1,2280

1.2

0
0 0.1 0.2 0.3 0.4 0.5
1.1 Penurunan

7,2
1
Keterangan : Penumbukan 55 kali
0 1 2 3 4 5 6 7 8 9 10 Penumbukan 25 kali
CBR (%)
Penumbukan 10 kali
CBR LABORATORIUM : 7,2 %
Grafik 3.C.1 CBR Laboratorium